  1. Comprehensive Environmental Management Plan

    International Nuclear Information System (INIS)

    Hjeresen, D.L.

    1994-01-01

    The Environmental Management Program at Los Alamos National Laboratory is in the process of initiating and then implementing a Comprehensive Environmental Management Plan (CEMP). There are several environmental impact and compliance drivers for this initiative. The Los Alamos CEMP is intended to be a flexible, long-range process that predicts, minimizes, treats, and disposes of any waste generated in execution of the Los Alamos mission - even if that mission changes. The CEMP is also intended to improve stakeholder and private sector involvement and access to environmental information. The total quality environmental management (TQEM) process will benchmark Los Alamos to private sector and DOE operations, identify opportunities for improvement, prioritize among opportunities, implement projects, measure progress, and spur continuous improvement in Environmental Management operations

  2. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  3. Hanford Environmental Information System Configuration Management Plan

    International Nuclear Information System (INIS)

    1996-06-01

    The Hanford Environmental Information System (HEIS) Configuration Management Plan establishes the software and data configuration control requirements for the HEIS and project-related databases maintained within the Environmental Restoration Contractor's data management department

  4. MDOT Materials Laboratories : Environmental Management Plan

    Science.gov (United States)

    2012-06-01

    The goal of this EMP was to develop and implement a comprehensive Environmental : Management Plan for MDOT Materials Laboratories. This goal was achieved through : perfonnance of environmental audits to identify potential environmental impacts, and b...

  5. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  6. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  7. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  8. Planning for and managing environmental restoration waste

    International Nuclear Information System (INIS)

    Miller, J.Q.

    1993-01-01

    This paper describes the approach used to support the management of environmental restoration (ER) waste. A general description is provided of the tools and techniques that have been developed and applied to produce waste generation forecast data and treatment, storage, and disposal capacity needs. The ER Program can now consistently manage ER waste streams from initial generation through ultimate disposal. Utilizing the valuable information that results from application of strategically planned systems and techniques demonstrates the ability to provide the necessary waste management support for the ER cleanup process

  9. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  10. Environmental development plan. LWR commercial waste management

    International Nuclear Information System (INIS)

    1980-08-01

    This Environmental Development Plan (EDP) identifies the planning and managerial requirements and schedules needed to evaluate and assess the environmental, health and safety (EH and S) aspects of the Commercial Waste Management Program (CWM). Environment is defined in its broadest sense to include environmental, health (occupational and public), safety, socioeconomic, legal and institutional aspects. This plan addresses certain present and potential Federal responsibilities for the storage, treatment, transfer and disposal of radioactive waste materials produced by the nuclear power industry. The handling and disposal of LWR spent fuel and processed high-level waste (in the event reprocessing occurs) are included in this plan. Defense waste management activities, which are addressed in detail in a separate EDP, are considered only to the extent that such activities are common to the commercial waste management program. This EDP addresses three principal elements associated with the disposal of radioactive waste materials from the commercial nuclear power industry, namely Terminal Isolation Research and Development, Spent Fuel Storage and Waste Treatment Technology. The major specific concerns and requirements addressed are assurance that (1) radioactivity will be contained during waste transport, interim storage or while the waste is considered as retrievable from a repository facility, (2) the interim storage facilities will adequately isolate the radioactive material from the biosphere, (3) the terminal isolation facility will isolate the wastes from the biosphere over a time period allowing the radioactivity to decay to innocuous levels, (4) the terminal isolation mode for the waste will abbreviate the need for surveillance and institutional control by future generations, and (5) the public will accept the basic waste management strategy and geographical sites when needed

  11. Guide to Developing an Environmental Management System - Plan

    Science.gov (United States)

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  12. Quality Management Plan for the Environmental Assessment and Innovation Division

    Science.gov (United States)

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  13. Presentation of Coastal Environmental Management Plan by using ...

    African Journals Online (AJOL)

    MICHAEL HORSFALL

    ABSTRACT: The provision of environment management plan and ... environmental management plan of the eastern coasts of Mazandaran Province. ..... REFERENCE ... Department of oceanography, texas A&M university. An online textbook.

  14. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  15. Standard Review Plan for Environmental Restoration Program Quality Management Plans

    International Nuclear Information System (INIS)

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements

  16. Environmental planning and management of urban natural landscapes

    Directory of Open Access Journals (Sweden)

    A.R. Sadeghi

    2016-07-01

    Full Text Available Advantages of urbanization such as access to clean water, health, and overall easier life in cities, as well as the disadvantages or its negative effects on environment cannot be ignored. Today, there are numerous environmental problems due to the reduction in ecologically valuable places within urban areas. Bringing nature to the cities appears to be essential to enhance urban environment and to reduce environmental problems in urban communities. In fact, issues resulting from the idea of "sustainability" as a policy-making goal require an integrated environmental policy-making approach. The innovations of new environmental policy-making require policy-making mechanisms that can deal with interdependent characteristics of environmental problems. To this end, new structures have emerged known as Environmental Planning and Management and Strategic Environmental planning and management. This analytical – descriptive article aims to re-examine the origins and concepts related to environmental planning using a field and desk study. With the introduction of urban natural landscape, Environmental planning considers such spaces within the city. In this regard, Khoshk River, Shiraz, Iran, as an urban natural landscape, was analyzed. Environmental planning-based polices were proposed to improve quality of the place under discussion.

  17. Presentation of Coastal Environmental Management Plan by using ...

    African Journals Online (AJOL)

    The provision of environment management plan and formulating the environmental strategies of coastal regions are the most essential measures required for the integrated management of coastal regions. For this purpose, this research has been conducted using two goal-oriented and problem-oriented approaches in ...

  18. 78 FR 37846 - Resource Management Plan/General Plan and Environmental Impact Statement/Environmental Impact...

    Science.gov (United States)

    2013-06-24

    ...The Bureau of Reclamation and the California Department of Parks and Recreation (CDPR) have prepared a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Luis Reservoir State Recreation Area Resource Management Plan/General Plan (RMP/GP). The Final EIS/EIR describes and presents the environmental effects of the No Action/No Project Alternative and three Action Alternatives for implementing the RMP/GP. A Notice of Availability of the Draft EIS/EIR was published in the Federal Register on August 3, 2012 (77 FR 46518). The comment period on the Draft EIS/EIR ended on October 2, 2012. The Final EIS/EIR contains responses to all comments received and reflects comments and any additional information received during the review period.

  19. Hanford Site waste management and environmental restoration integration plan

    International Nuclear Information System (INIS)

    Merrick, D.L.

    1990-01-01

    The ''Hanford Site Waste Management and Environmental Restoration Integration Plan'' describes major actions leading to waste disposal and site remediation. The primary purpose of this document is to provide a management tool for use by executives who need to quickly comprehend the waste management and environmental restoration programs. The Waste Management and Environmental Restoration Programs have been divided into missions. Waste Management consists of five missions: double-shell tank (DST) wastes; single-shell tank (SST) wastes (surveillance and interim storage, stabilization, and isolation); encapsulated cesium and strontium; solid wastes; and liquid effluents. Environmental Restoration consists of two missions: past practice units (PPU) (including characterization and assessment of SST wastes) and surplus facilities. For convenience, both aspects of SST wastes are discussed in one place. A general category of supporting activities is also included. 20 refs., 14 figs., 7 tabs

  20. Discussion on teaching reform of environmental planning and management

    Science.gov (United States)

    Zhang, Qiugen; Chen, Suhua; Xie, Yu; Wei, Li'an; Ding, Yuan

    2018-05-01

    The curriculum of environmental planning and management is an environmental engineering major curriculum established by the teaching steering committee of environmental science and engineering of Education Ministry, which is the core curriculum of Chinese engineering education professional certification. It plays an important role in cultivating environmental planning and environmental management ability of environmental engineering major. The selection and optimization of the course teaching content of environmental planning and management were discussed which including curriculum teaching content updating and optimizing and teaching resource system construction. The comprehensive application of teaching method was discussed which including teaching method synthesis and teaching method. The final combination of the assessment method was also discussed which including the formative assessment normal grades and the final result of the course examination. Through the curriculum comprehensive teaching reform, students' knowledge had been broadened, the subject status and autonomy of learning had been enhanced, students' learning interest had been motivated, the ability of students' finding, analyzing and solving problems had been improved. Students' innovative ability and positive spirit had been well cultivated.

  1. Strategic plan for Hanford Site Environmental Restoration Information Management

    International Nuclear Information System (INIS)

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site's soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site's production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user's needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach

  2. Department of Energy Environmental Management Plan for Oak Ridge Reservation

    International Nuclear Information System (INIS)

    1984-01-01

    The Environmental Program Management Plan for the Oak Ridge Complex was prepared in response to recommendations made at the Congressional hearing held in Oak Ridge on July 11, 1983, to discuss the extent and impact of mercury and other pollutants from DOE's Oak Ridge facilities. While this is a planning document and not a commitment of funds, this effort will help to focus DOE resources toward resolving environmental problems at Oak Ridge in a timely and cost-effective manner. The plan includes: (1) an environmental planning basis; (2) a brief description of the problems and proposed resolutions for each plant; (3) research and development requirements and funding schedules; (4) funding schedule summaries; and (5) continuing analyses and unresolved issues. The planning basis provides the foundation for identifying the environmental problems and their potential resolutions. While applicable environmental standards must be met, there is considerable latitude for interpretation of existing regulations and projection of future requirements. This latitude can have a significant impact on funding and scheduling. 11 figures, 8 tables

  3. ORNL long-range environmental and waste management plan

    International Nuclear Information System (INIS)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs

  4. ORNL long-range environmental and waste management plan

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

  5. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a... plans, general environmental studies, and strategies and action programs to implement plans, including...

  6. Environmental restoration and remediation technical data management plan

    International Nuclear Information System (INIS)

    Key, K.T.; Fox, R.D.

    1994-02-01

    The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit

  7. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Science.gov (United States)

    2010-11-24

    ... management under alternative B would be to enable visitor participation in a wide variety of outdoor... DEPARTMENT OF THE INTERIOR National Park Service [2031-A046-409] General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental Impact Statement, Big Cypress National...

  8. 78 FR 73559 - Moose-Wilson Corridor Comprehensive Management Plan, Environmental Impact Statement, Grand Teton...

    Science.gov (United States)

    2013-12-06

    ...-Wilson Corridor Comprehensive Management Plan, Environmental Impact Statement, Grand Teton National Park... is preparing a Comprehensive Management Plan and Environmental Impact Statement (EIS) for the Moose...; (2) distinguish the corridor's fundamental and other important resources and values; (3) clearly...

  9. 76 FR 3652 - Dog Management Plan/Environmental Impact Statement, Golden Gate National Recreation Area, California

    Science.gov (United States)

    2011-01-20

    ... DEPARTMENT OF THE INTERIOR National Park Service [8145-8B90-SZM] Dog Management Plan/Environmental...: Notice of Availability of a Draft Environmental Impact Statement for the Dog Management Plan, Golden Gate... the Dog Management Plan (Draft Plan/EIS), Golden Gate National Recreation Area (GGNRA), California...

  10. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    Science.gov (United States)

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  11. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Science.gov (United States)

    2010-07-01

    ... compliance, waste minimization, risk reduction and continual improvement of the environmental management... its compliance with the Environmental Management Plan and applicable federal and state hazardous waste... laboratory environmental management plan? 262.105 Section 262.105 Protection of Environment ENVIRONMENTAL...

  12. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  13. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 570.205 Section 570.205..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning... known or suspected environmental contamination. (5) [Reserved] (6) Policy—planning—management—capacity...

  14. Albeni Falls Wildlife Management Plan - preliminary environmental assessment

    International Nuclear Information System (INIS)

    1996-04-01

    Bonneville Power Administration (BPA) proposes to fund the development and implementation of the Albeni Falls Wildlife Management Plan. Approved by the Northwest Power Planning Council (Council) in 1990, the project is a cooperative effort with the Interagency Work Group that includes the Idaho Department of Fish and Game (IDFG); United States Fish and Wildlife Service (USFWS); United States Forest Service (USFS); United States Army Corps of Engineers (COE); the Kalispel Tribe; and the Upper Columbia United Tribes (UCUT). The proposed action would enable the Interagency Work Group to protect and enhance a variety of wetland and riparian habitats, restore 28,587 habitat units lost as a result of the construction and operation of Albeni Falls Dam, and implement long-term wildlife management activities at selected sites within the overall study area. This Environmental Assessment (EA) examines the potential environmental effects of protecting and enhancing wildlife habitat in selected portions of a 225,077 hectare (556,160 acre) study area surrounding Lake Pend Oreille in Bonner County, and 7,770 hectare (19,200 acre) area surrounding Spirit and Twin lakes, in Kootenai County, Idaho. Four proposed activities are analyzed: habitat protection; habitat enhancement; operation and maintenance (O ampersand M); and monitoring and evaluation (M ampersand E)

  15. 76 FR 44604 - Draft Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact...

    Science.gov (United States)

    2011-07-26

    ... Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact Statement AGENCY... availability of the Draft Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact... resident Canada geese. Action is needed at this time to manage the restored wetlands at the Park. The Plan...

  16. 77 FR 33237 - Saline Valley Warm Springs Management Plan/Environmental Impact Statement, Death Valley National...

    Science.gov (United States)

    2012-06-05

    ... Valley Warm Springs Management Plan/Environmental Impact Statement, Death Valley National Park, Inyo... an Environmental Impact Statement for the Saline Valley Warm Springs Management Plan, Death Valley... analysis process for the Saline Valley Warm Springs Management Plan for Death Valley [[Page 33238...

  17. Environmental Management Systems: A Framework for Planning Green Campuses.

    Science.gov (United States)

    Keniry, Julian

    2003-01-01

    Drawing on recent survey data from the National Wildlife Federation and other publications, explains what an environmental management system is and identifies its components; examines how environmental management systems have been applied in higher education settings; reports on trends in implementation; and illustrates how the environmental…

  18. 36 CFR 223.218 - Consistency with plans, environmental standards, and other management requirements.

    Science.gov (United States)

    2010-07-01

    ..., environmental standards, and other management requirements. 223.218 Section 223.218 Parks, Forests, and Public... Special Forest Products § 223.218 Consistency with plans, environmental standards, and other management... with applicable land management plans. Each contract, permit, or other authorizing instrument shall...

  19. 76 FR 27344 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Science.gov (United States)

    2011-05-11

    ... and resource management activities must be guided by general principles that can be applied to... Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San Bernardino County... Management Plan/ Environmental Impact Statement for Mojave National Preserve. SUMMARY: In accordance with Sec...

  20. 76 FR 75556 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2011-12-02

    ...] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Taos Field Office, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of...) has prepared the Proposed Resource Management Plan/Final Environmental Impact Statement (Proposed RMP...

  1. 76 FR 22917 - Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National Recreation Area...

    Science.gov (United States)

    2011-04-25

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-PWR-PWRO--0315-696; 8145-8B90-SZM] Dog... Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan and Environmental Impact Statement (Plan/DEIS). The Plan...

  2. Environmental protection Implementation Plan

    International Nuclear Information System (INIS)

    Holland, R. C.

    1999-01-01

    This ''Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ''Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities

  3. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Science.gov (United States)

    2010-03-05

    ... DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final Environmental Impact... Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the National... the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona. On January...

  4. 78 FR 55093 - Dog Management Plan, Supplemental Environmental Impact Statement, Golden Gate National Recreation...

    Science.gov (United States)

    2013-09-09

    ....YP0000] Dog Management Plan, Supplemental Environmental Impact Statement, Golden Gate National Recreation... the Dog Management Plan (Plan/SEIS), Golden Gate National Recreation Area (GGNRA), California. Current dog management in the park is based on a number of factors. Areas included in the GGNRA Citizens...

  5. 76 FR 22721 - Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact...

    Science.gov (United States)

    2011-04-22

    ...] Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact Statement for the Bighorn Basin Resource Management Plan Revision Project, Cody and Worland Field Offices... Draft Resource Management Plan (RMP) for the Cody Field Office, a Draft RMP for the Worland Field Office...

  6. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Science.gov (United States)

    2013-02-14

    ... Environmental Assessment for Monitor National Marine Sanctuary: Notice of Public Availability AGENCY: Office of National Marine Sanctuaries (ONMS), National Ocean Service (NOS), National Oceanic and Atmospheric... releasing the final management plan and environmental assessment for Monitor National Marine Sanctuary. DATE...

  7. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Science.gov (United States)

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  8. 75 FR 1806 - Draft General Management Plan and Environmental Impact Statement, New River Gorge National River, WV

    Science.gov (United States)

    2010-01-13

    ... visitor experiences. Management actions would build upon the cultural resource, interpretive, and... DEPARTMENT OF THE INTERIOR National Park Service Draft General Management Plan and Environmental... Interior. ACTION: Notice of availability of the Draft General Management Plan and Environmental Impact...

  9. 78 FR 13376 - Chronic Wasting Disease Management Plan/Environmental Impact Statement, Shenandoah National Park

    Science.gov (United States)

    2013-02-27

    ... and experience from management actions; and minimize the potential for health and safety issues for...] Chronic Wasting Disease Management Plan/Environmental Impact Statement, Shenandoah National Park AGENCY... National Environmental Policy Act of 1969 and the Council on Environmental Quality regulations, the...

  10. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2013-02-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000 L16100000.DQ0000 LXSS04 K0000] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land Management, Interior. ACTION...

  11. 78 FR 13081 - Draft Environmental Impact Statement for General Management Plan, Everglades National Park, Florida

    Science.gov (United States)

    2013-02-26

    ... visitor use in the Park. The GMP will provide updated management direction for the entire park. The EEWS....YP0000] Draft Environmental Impact Statement for General Management Plan, Everglades National Park... the General Management Plan (GMP) and East Everglades Wilderness Study (EEWS) for Everglades National...

  12. Environmental Management 1995: Progress and plans of the Environmental Management Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program`s activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy`s Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ``site`` is a Department of Energy installation; a ``facility`` is a building located on a Department of Energy site; and an ``area`` is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ``year`` refers to the Federal Government`s Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program.

  13. Environmental Management 1995: Progress and plans of the Environmental Management Program

    International Nuclear Information System (INIS)

    1995-02-01

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program's activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy's Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ''site'' is a Department of Energy installation; a ''facility'' is a building located on a Department of Energy site; and an ''area'' is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ''year'' refers to the Federal Government's Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program

  14. 76 FR 75557 - Draft Environmental Impact Statement for General Management Plan/Wilderness Study, Hawaii...

    Science.gov (United States)

    2011-12-02

    ... Environmental Impact Statement for General Management Plan/ Wilderness Study, Hawaii Volcanoes National Park, Hawaii AGENCY: National Park Service, Interior. ACTION: Notice of intent. SUMMARY: The National Park... updating the General Management Plan (GMP) for Hawaii Volcanoes National Park. As part of this conservation...

  15. Integration of environmental flow assessment and freshwater conservation planning: a new era in catchment management

    CSIR Research Space (South Africa)

    Nel, JL

    2011-03-01

    Full Text Available Integrated water resources management offers an ideal platform for addressing the goals of freshwater conservation and climate change adaptation. Environmental flow assessment and systematic conservation planning have evolved separately...

  16. Strategic Plan for Sustainable Energy Management and Environmental Stewardship for Los Angeles Unified School District

    Energy Technology Data Exchange (ETDEWEB)

    Walker, A.; Beattie, D.; Thomas, K.; Davis, K.; Sim, M.; Jhaveri, A.

    2007-11-01

    This Strategic Plan for Sustainable Energy Management and Environmental Stewardship states goals, measures progress toward goals and how actions are monitored to achieve continuous improvement for the Los Angeles Unified School District.

  17. Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  18. 78 FR 26067 - General Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas

    Science.gov (United States)

    2013-05-03

    .... Alternative 2, the NPS preferred alternative, would support a broad ecosystem approach for preserve management... management of cross-boundary resource issues and the importance of encouraging partnerships to address and... Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas AGENCY: National...

  19. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  20. Environmental restoration and waste management site-specific plan for Richland Operations Office

    International Nuclear Information System (INIS)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs

  1. Environmental protection implementation plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1998-03-01

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable

  2. Managing Water for African Cities Johannesburg City Implementation Plan Environmental Component Appraisal Report

    OpenAIRE

    Damhaug, T.

    2000-01-01

    Årsliste 2000 This is an appraisal of the environmental component of the Johannesburg City Implementation Plan under the Habitat guided programme "Managing Water for African Cities". The objective of this appraisal was to ensure the conformity of the plan with the objectives of the Regional Project and South Africa's needs and to explore the availability of domestic resources (human, institutional, and financial) required for efficient project implementation. The environmental component wi...

  3. The DOE Office of Environmental Restoration and Waste Management comprehensive integrated planning process

    International Nuclear Information System (INIS)

    Aiken, R.J.; Draffin, C.W. Jr.; Pflock, K.T.

    1992-01-01

    This paper reports that comprehensive integrated planning is critical to the ultimate success of the DOE Office of Environmental Restoration and Waste Management's (EM) program because of the significant technical and institutional complexities, the tens of billions of dollars required, the regulatory and fiscal uncertainty, and the multitude of federal, state, and private sector organizations involved. Using the philosophy that sound and forward looking planning should guide budgetary and management decisionmaking, and that clear priorities are essential to program success, EM's comprehensive approach includes strategic planning, the annually updated EM Five-Year Plan, the EM Management Plan, and Site Specific Plans. Roadmaps (which facilitate issue identification and resolution), Activity Data Sheets, prioritization methodologies, and installation-specific Progress Charts are among the tools employed in support of the EM integrated planning process

  4. 76 FR 57760 - Notice of Availability of Draft Resource Management Plan and Draft Environmental Impact Statement...

    Science.gov (United States)

    2011-09-16

    ... approximately 707,000 subsurface acres of Federal mineral estate. Decisions in the Colorado River Valley RMP... Availability of Draft Resource Management Plan and Draft Environmental Impact Statement for the Colorado River Valley Field Office, Colorado AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability...

  5. Integrating strategic environmental assessment with industry planning: a case study of the Pasquai-Porcupine forest management plan, Saskatchewan, Canada.

    Science.gov (United States)

    Noble, Bram F

    2004-03-01

    Strategic environmental assessment (SEA) is gaining widespread recognition as a tool for integrating environmental considerations in policy, plan, and program development and decision-making. Notwithstanding the potential of SEA to improve higher-order decision processes, there has been very little attention given to integrating SEA with industry planning practices. As a result, the benefits of SEA have yet to be fully realized among industrial proponents. That said, SEA practice is ongoing, albeit informally and often under a different label, and is proving to be a valuable tool for industry planning and decision-making. Based on a case study of the Pasquai-Porcupine forest management plan in Saskatchewan, Canada, this paper illustrates how an integrated approach to SEA can contribute to industry environmental decision-making and can enhance the quality and deliverability of industry plans.

  6. The U.S. Department of Energy Environmental Restoration and Waste Management Five-Year Plan

    International Nuclear Information System (INIS)

    Grimm, P.

    1990-01-01

    Within the first month after being confirmed as this country's sixth secretary of energy, Admiral James D. Watkins (US Navy, Retired) promised Congress that he would deliver a comprehensive plan that outlines specific actions to undertake over the next 5 yr to achieve compliance with US environmental laws and to begin to clean up and restore those sites that we have contaminated over the past 40 yr. The Environmental Restoration and Waste Management Five-Year Plan was published in August 1989. As the admiral committed, the plan established and documented an agenda for compliance and cleanup against which progress in the area of environmental restoration and waste management would be measured and specifically identified actions and commitments to achieve this progress. In November 1989, an additional chapter identifying the applied research, development, demonstration, testing, and evaluation (RDDT and E) activities that would support the implementation of the plan was published. Last June, the US Department of Energy (DOE) issued the first annual update of the 5-yr plan. This update covers the years 1992-1996, notes the progress achieved during the past year, and incorporates the scope of both the original plan and the RDDT and E plan. The plan is divided into five sections: corrective activities, environmental restoration, waste operations, technology development, and transportation. Each section explains DOE's overall policies and plans for achieving compliance and cleanup at DOE's nuclear-related facilities

  7. Environmental Restoration and Waste Management Site-Specific Plan (SSP) for fiscal year 1992 (FY92)

    International Nuclear Information System (INIS)

    1991-09-01

    The FY-92 Site-Specific Plan (FY-92 SSP) for environmental restoration and waste management at the Idaho National Engineering Laboratory (INEL) is designed to provide the reader with easy access to the status of environmental restoration and waste management activities at INEL. The first chapter provides background on INIEL's physical environment, site history and mission, and general information about the site and its facilities. In addition, this chapter discusses the inter-relationships between the Site Specific Plan, the Environmental Restoration and Waste Management Five-Year Plan, the environmental restoration and waste management prioritization systems, and the Activity Data Sheets (ADSs) for environmental restoration and waste management. This discussion should help readers understand what the SSP is and how it fits into the environmental restoration and waste management process at INEL. This understanding should provide the reader with a better context for understanding the discussions in the SSP as well as a better feel for how and what to comment on during the public comment period that will be held from the first of September through the end of October 1991

  8. Development of environmental management plan for deep-sea mining

    Digital Repository Service at National Institute of Oceanography (India)

    Sharma, R.

    by different contractors, and guidelines for monitoring the impacts have been issued by the International Seabed Authority. At this stage, it is essential to review the information acquired so far in relation to environmental impacts so as to enable development...

  9. Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.

  10. Environmental implementation plan: Chapter 14, Environmental compliance tracking and data management

    International Nuclear Information System (INIS)

    Story, C.H.

    1993-01-01

    Environmental projects, issues, and programs have become increasingly important to the Westinghouse Savannah River Company (WSRC) management and the Department of Energy (DOE). A compliance-tracking system has been developed to monitor environmental requirements and commitments because they have become increasingly complex and numerous. An Environmental Data Management (EDM) steering committee was formed in October 1987 to develop computer system solutions to environmental needs. The committee's main objective is to coordinate, within SRS divisions, the separate efforts that have been or are being developed to meet regulatory requirements and specific programmatic goals. The Environmental and Graphical Information Systems (E ampersand GIS) Program was recently developed to establish a more formal organizational structure and enhance the coordination of geographical information systems (GIS) and environmental data management (EDM) activities at SRS. The general strategy of the program is to establish a coordination focal point for GIS and EDM activities, to provide for the integration of the several environmental and graphical information systems which exist mostly in stand-alone arrangements, and to guide the development of data management and geographical information applications in order to achieve alignment with Site computing architecture and standards. The E ampersand GIS Program will enhance the Site's ability to respond to data requirements in support of new missions, changing directives, and increasing regulatory requirements

  11. Managing the environmental impacts of land transport: integrating environmental analysis with urban planning

    International Nuclear Information System (INIS)

    Irving, Paul; Moncrieff, Ian

    2004-01-01

    Ecological systems have limits or thresholds that vary by pollutant type, emissions sources and the sensitivity of a given location. Human health can also indicate sensitivity. Good environmental management requires any problem to be defined to obtain efficient and effective solutions. Cities are where transport activities, effects and resource management decisions are often most focussed. The New Zealand Ministry of Transport has developed two environmental management tools. The Vehicle Fleet Model (VFM) is a predictive database of the environmental performance of the New Zealand traffic fleet (and rail fleet). It calculates indices of local air quality, stormwater, and greenhouse gases emissions. The second is an analytical process based on Environmental Capacity Analysis (ECA). Information on local traffic is combined with environmental performance data from the Vehicle Fleet Model. This can be integrated within a live, geo-spatially defined analysis of the overall environmental effects within a defined local area. Variations in urban form and activity (traffic and other) that contribute to environmental effects can be tracked. This enables analysis of a range of mitigation strategies that may contribute, now or in the future, to maintaining environmental thresholds or meeting targets. A case study of the application of this approach was conducted within Waitakere City. The focus was on improving the understanding of the relative significance of stormwater contaminants derived from land transport

  12. Environmental restoration and waste management five-year plan, Fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of environmental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Over the past three years, the Five Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. The Five-Year Plan is not exclusively focused on near-term activities. It also expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. This goal was established in response to recommendations from the State and Tribal Government Working Group (STGWG) that DOE define a specific end point for completing necessary remediation and restoration activities. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals

  13. Environmental Management Waste Management Facility (EMWMF) Site-Specific Health and Safety Plan, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Flynn, N.C. Bechtel Jacobs

    2008-04-21

    The Bechtel Jacobs Company LLC (BJC) policy is to provide a safe and healthy workplace for all employees and subcontractors. The implementation of this policy requires that operations of the Environmental Management Waste Management Facility (EMWMF), located one-half mile west of the U.S. Department of Energy (DOE) Y-12 National Security Complex, be guided by an overall plan and consistent proactive approach to environment, safety and health (ES&H) issues. The BJC governing document for worker safety and health, BJC/OR-1745, 'Worker Safety and Health Program', describes the key elements of the BJC Safety and Industrial Hygiene (IH) programs, which includes the requirement for development and implementation of a site-specific Health and Safety Plan (HASP) where required by regulation (refer also to BJC-EH-1012, 'Development and Approval of Safety and Health Plans'). BJC/OR-1745, 'Worker Safety and Health Program', implements the requirements for worker protection contained in Title 10 Code of Federal Regulations (CFR) Part 851. The EMWMF site-specific HASP requirements identifies safe operating procedures, work controls, personal protective equipment, roles and responsibilities, potential site hazards and control measures, site access requirements, frequency and types of monitoring, site work areas, decontamination procedures, and outlines emergency response actions. This HASP will be available on site for use by all workers, management and supervisors, oversight personnel and visitors. All EMWMF assigned personnel will be briefed on the contents of this HASP and will be required to follow the procedures and protocols as specified. The policies and procedures referenced in this HASP apply to all EMWMF operations activities. In addition the HASP establishes ES&H criteria for the day-to-day activities to prevent or minimize any adverse effect on the environment and personnel safety and health and to meet standards that define acceptable

  14. Environmental restoration and waste management five year plan, fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ''bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information at the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals

  15. Energy planning and management plan

    International Nuclear Information System (INIS)

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  16. 77 FR 39253 - Final Environmental Impact Statement on the Denali Park Road Vehicle Management Plan, Denali...

    Science.gov (United States)

    2012-07-02

    ... online at the NPS Planning, Environmental and Public Comment Web site at http://parkplanning.nps.gov/dena... served well as a way to manage vehicle use, while providing high quality visitor opportunities to see... framework for vehicle use based on indicators and standards for visitor experiences and resource protection...

  17. 76 FR 17471 - Air Tour Management Plan Environmental Assessment for Mount Rainier National Park, WA; Public...

    Science.gov (United States)

    2011-03-29

    ... draft alternatives in the development of an Air Tour Management Plan (ATMP) for the Mount Rainier... Environmental Assessment (EA), an ATMP, and associated rulemaking actions which comply with the National...: http://parkplanning.nps.gov/MORA_ATMP or sent to the mailing addresses listed in the ``FOR FURTHER...

  18. ORNL long-range environmental and waste management plan: Program overview and summary

    International Nuclear Information System (INIS)

    Bates, L.D.; Berry, J.B.; Butterworth, G.E.

    1988-04-01

    The primary purpose of this report is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The docuemnt also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document: it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) Management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. The near-term (one to three years) part of the plan is a realistic assessment of the current program and ongoing capital projects and reflects the efforts preceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. Beyond the immediate time frame, the document reflects the strategy and the project and funding estimates as a snapshot at the time of publication. Annual revision will reflect the continuing evoltuion and development of environmental and waste management processes, characterizations, remedial actions, regulations, an strategies for the establishment and conduct of a comprehensive environmental and waste management program. 15 figs., 10 tabs

  19. Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    1993-01-01

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94

  20. Waste management/waste certification plan for the Oak Ridge National Laboratory Environmental Restoration Program

    International Nuclear Information System (INIS)

    Clark, C. Jr.; Hunt-Davenport, L.D.; Cofer, G.H.

    1995-03-01

    This Waste Management/Waste Certification (C) Plan, written for the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL), outlines the criteria and methodologies to be used in the management of waste generated during ORNL ER field activities. Other agreed upon methods may be used in the management of waste with consultation with ER and Waste Management Organization. The intent of this plan is to provide information for the minimization, handling, and disposal of waste generated by ER activities. This plan contains provisions for the safe and effective management of waste consistent with the U.S. Environmental Protection Agency's (EPA's) guidance. Components of this plan have been designed to protect the environment and the health and safety of workers and the public. It, therefore, stresses that investigation derived waste (IDW) and other waste be managed to ensure that (1) all efforts be made to minimize the amount of waste generated; (2) costs associated with sampling storage, analysis, transportation, and disposal are minimized; (3) the potential for public and worker exposure is not increased; and (4) additional contaminated areas are not created

  1. 78 FR 67187 - Notice of Availability of the Draft General Management Plan/Wilderness Study/Environmental Impact...

    Science.gov (United States)

    2013-11-08

    ... focus on protecting natural resources and systems. Under this alternative, most of the Big Spring... Availability of the Draft General Management Plan/ Wilderness Study/Environmental Impact Statement for the... Management Plan/Wilderness Study/Environmental Impact Statement (GMP/WS/EIS) for the Ozark National Scenic...

  2. Best management practices plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-02-01

    This Best Management Practices (BMP) Plan has been developed as part of the environmental monitoring program at Waste Area Grouping (WAG) 6. The BMP Plan describes the requirements for personnel training, spill prevention and control, environmental compliance, and sediment/erosion control as they relate to environmental monitoring activities and installation of Monitoring Station 4 at WAG 6

  3. Integration between environmental management and strategic planning in the oil and gas sector

    International Nuclear Information System (INIS)

    Magrini, Alessandra; Lins, Luiz dos Santos

    2007-01-01

    For activities that have a high possibility of causing environmental accidents, like in the oil and gas sector, it is reasonable to expect the environmental management to be an important variable within the company's strategic planning. However, this is not always true. In some cases, a change in the companies' attitude, abandoning a reactive position and assuming a proactive one, only happens upon the occurrence of serious environmental accidents with strong repercussion in the media. For the company that was the object of study, these accidents gave rise to deep changes in its environmental management, culminating in investments of approximately US$ 2.6 billion in environment, health and security, from 2000 to 2004. This was the highest amount to date invested on these areas by an oil company. This case study seeks to discuss the integration between environmental management and strategic planning in the oil and gas sector over a period of 10 years (from 1995 to 2004) in order to make a contextual analysis of the period before and after the environmental accidents possible

  4. 76 FR 31359 - Notice of Intent To Prepare an Environmental Impact Statement on a General Management Plan...

    Science.gov (United States)

    2011-05-31

    ... management activities, visitor activities, and developments that would be appropriate in the park in the future. In addition, the plan will generally address visitor-use related issues and provide management... Environmental Impact Statement on a General Management Plan Amendment/Wilderness Study for Lake Clark National...

  5. 78 FR 43226 - Going-to-the-Sun Road Corridor Management Plan, Environmental Impact Statement, Glacier National...

    Science.gov (United States)

    2013-07-19

    ... effort will result in an integrated visitor and transportation management plan for the Going-to-the Sun... sustainability of the park's shuttle system, management of visitor use, and congestion and protection of natural...] Going-to-the-Sun Road Corridor Management Plan, Environmental Impact Statement, Glacier National Park...

  6. Adaptive management and environmental decision making. A case study application to water use planning

    International Nuclear Information System (INIS)

    Gregory, Robin; Failing, Lee; Higgins, Paul

    2006-01-01

    Adaptive management (AM) techniques are one of the principal tools proposed by environmental decision makers to provide flexible and responsive management approaches over time. However, the record of successful applications is surprisingly small. We believe that this in part reflects the lack of an intuitively plausible framework for evaluating AM initiatives. This paper outlines such a framework, based on the insights of decision analysis, for evaluating the use of AM as a technique to improve environmental management decisions. British Columbia's Water Use Plan (WUP) process, which has developed operating plans for more than 20 major hydroelectric facilities, is introduced as a case-study example. The discussion emphasizes that decisions to adopt adaptive management strategies involve judgments concerning tradeoffs across a variety of economic, environmental, and social objectives. As a result, adaptive management initiatives need to be carefully evaluated based on their merits relative to other alternatives. Within an AM framework, alternative experimental designs should be evaluated because the design of a preferred experiment involves choices among different levels of investment, the quality of available and desired future information, and different ecological, economic, and social risks. (author)

  7. Basic planning and work performance of Hanford Site environmental management activities

    International Nuclear Information System (INIS)

    Piper, L.L.

    1997-01-01

    This document provides an overview of the basic planning and work of the Department of Energy Richland Operations Office (DOE-RL). It defines key terms, concepts, and processes used in Hanford's Environmental Management (EM) activities. It is not intended to provide complete details on the topics discussed. It does, however, provide a roadmap of the overall process so that opportunities for tribal, regulator, and public involvement can be clearly identified. Many documents are referenced in this plan. Each is described in some detail in Section 5, and cross-references to that section are provided throughout the discussion in Sections 1 through 4

  8. Environmental restoration and waste management five-year plan, Fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    The US Department of Energy (DOE) understands that cleaning up the Nation's nuclear-related sites and facilities affects many different segments of the public, ranging from communities near DOE facilities to engineers concerned with developing new technologies to clean up the environment. In an effort to make the Environmental Restoration and Waste Management Five-Year Plan for Fiscal Years (FY) 1994--1998 more responsive to your concerns, DOE invites your comments on the plan. Volume II contains 37 Installation Summaries that provide a synopsis of past, present and future activities of each major installation, and Progress Charts

  9. Managing environmental enhancement plans for individual research projects at a national primate research center.

    Science.gov (United States)

    Thom, Jinhee P; Crockett, Carolyn M

    2008-05-01

    We describe a method for managing environmental enhancement plans for individual research projects at a national primate research center where most monkeys are assigned to active research projects. The Psychological Well-being Program (PWB) at the University of Washington National Primate Research Center developed an Environmental Enhancement Plan form (EEPL) that allows PWB to quantify and track changes in enrichment allowances over time while ensuring that each animal is provided with as much enrichment as possible without compromising research. Very few projects involve restrictions on toys or perches. Some projects have restrictions on food treats and foraging, primarily involving the provision of these enrichments by research staff instead of husbandry staff. Restrictions are not considered exemptions unless they entirely prohibit an element of the University of Washington Environmental Enhancement Plan (UW EE Plan). All exemptions must be formally reviewed and approved by the institutional animal care and use committee. Most exemptions from elements of the UW EE Plan involve social housing. Between 2004 and 2006, the percentage of projects with no social contact restrictions increased by 1%, but those prohibiting any tactile social contact declined by 7%, and projects permitting tactile social contact during part of the study increased by 9%. The EEPL form has facilitated informing investigators about the enrichment their monkeys will receive if no restrictions or exemptions are requested and approved. The EEPL form also greatly enhances PWB's ability to coordinate the specific enrichment requirements of a project.

  10. ORNL Long-Range Environmental and Waste Management Plan: Program overview and summary

    International Nuclear Information System (INIS)

    Bates, L.D.; Berry, J.B.; Butterworth, G.E.

    1987-12-01

    The primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirments. The document also provides an estimate of the resources required to implenent the current plan. As with any document of this nature, the near-term (one to three years) part of the plan is a realistic assessment of the current program and ongoing capital projects and relects the efforts preceived to be necesary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. Beyond the immediate time frame, the document reflects the strategy and the project and funding estimates as a snapshot at the time of publication. 15 figs., 10 tabs

  11. Environmental development plan: magnetic fusion

    International Nuclear Information System (INIS)

    1979-09-01

    This Environmental Development Plan (EDP) identifies the planning and management requirements and schedules needed to evaluate and assess the environmental, health and safety (EH and S) aspects of the Magnetic Fusion Energy Program (MFE). Environment is defined to include the environmental, health (occupational and public), and safety aspects

  12. Data management plan for the Oak Ridge Environmental Information System, Version 1. 1

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-04

    The Data Management Plan (DMP) describes the data management objectives, system components, data base structure and contents, system maintenance, data processing, and user interface for the prototype phase of the Oak Ridge Environmental Information System (OREIS). The major goals of OREIS data management are to compile data of known quality, to maintain the integrity of the data base, and to provide data to users. The DMP defines the requirements, describes the responsibilities, and references the procedures for meeting the data management objectives. Emphasis is on management of measurement data and the associated metadata used to support its proper interpretation and legal defensibility. The DMP covers transmittal, processing, storage, and data access activities associated with OREIS. The OREIS data dictionary is provided as an appendix.

  13. Data management plan for the Oak Ridge Environmental Information System, Version 1.1

    International Nuclear Information System (INIS)

    1992-01-01

    The Data Management Plan (DMP) describes the data management objectives, system components, data base structure and contents, system maintenance, data processing, and user interface for the prototype phase of the Oak Ridge Environmental Information System (OREIS). The major goals of OREIS data management are to compile data of known quality, to maintain the integrity of the data base, and to provide data to users. The DMP defines the requirements, describes the responsibilities, and references the procedures for meeting the data management objectives. Emphasis is on management of measurement data and the associated metadata used to support its proper interpretation and legal defensibility. The DMP covers transmittal, processing, storage, and data access activities associated with OREIS. The OREIS data dictionary is provided as an appendix

  14. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R ampersand D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER ampersand WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT ampersand E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs

  15. Environmental management

    NARCIS (Netherlands)

    Guicherit, R.

    1996-01-01

    Elements of a national environmental management system include: • monitoring networks to establish the prevailing environmental quality; • emission inventories, and projected emission inventories based on population growth, increase of traffic density, and economie growth; taking into account

  16. 75 FR 41881 - Notice of Intent To Prepare a Shoreline Restoration and Management Plan/Environmental Impact...

    Science.gov (United States)

    2010-07-19

    ... lakeshore; and improved water quality. DATES: Any comments on the scope of issues to be addressed in the EIS... Restoration and Management Plan/Environmental Impact Statement (EIS) for Indiana Dunes National Lakeshore... impact statement (EIS) for a Shoreline Restoration and Management Plan (SRMP) for Indiana Dunes National...

  17. Stakeholder perceptions of Environmental Management Plans as an environmental protection tool for major developments in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Sophie; Kemp, Simon [Faculty of Engineering and the Environment, University of Southampton, SO17 1BJ (United Kingdom); Hudson, Malcolm D., E-mail: mdh@soton.ac.uk [Faculty of Engineering and the Environment, University of Southampton, SO17 1BJ (United Kingdom); Institute for Life Sciences, University of Southampton, SO17 1BJ (United Kingdom)

    2016-01-15

    Insufficient implementation and the lack of legislative requirements for follow-up measures following the approval of projects are consistently highlighted as major shortcomings of Environmental Impact Assessment (EIA). Although adopted over 15 years ago by the World Bank, Environmental Management Plans (EMPs) were only semi-formalised in the UK in 2008 and arguably provide a continuous link or ‘bridge’ between the EIA process pre-consent and an Environmental Management System (EMS) post-consent. Drawing on twenty-one semi-structured interviews with stakeholders and thematic analysis of their responses, and a broad-scale practitioner survey, this study aimed to assess the effectiveness of EMPs as an environmental protection tool across the project lifecycle for major developments. The findings revealed a mixed picture of EMP effectiveness in practice, with EMPs only partially fulfilling a bridging role between EIA and EMS. There is no ‘gold standard’ terminology for EMPs, all having slightly different uses, thus presenting different focuses to different stakeholders and further enhancing variation in practice. For many stakeholders, the effectiveness was simply not known, due to the lack of communication and follow-up that still exists. EMP–EMS linkages were shown to be effective from the developer's perspective when a single organisation has involvement across all project phases, though weaknesses occur when multiple parties are involved. Among other stakeholders, knowledge varied significantly; whilst some were in agreement that the linkages worked, many were unaware of the connections and thought of them as two quite separate tools. Stakeholders advocated for the need to make EMPs a legal requirement; for improved communication between stakeholders during EMP implementation and increased documentation of project outcomes; and for EMPs to be consistently written by environmental professionals. Furthermore, weak links in the current process may be

  18. Stakeholder perceptions of Environmental Management Plans as an environmental protection tool for major developments in the UK

    International Nuclear Information System (INIS)

    Bennett, Sophie; Kemp, Simon; Hudson, Malcolm D.

    2016-01-01

    Insufficient implementation and the lack of legislative requirements for follow-up measures following the approval of projects are consistently highlighted as major shortcomings of Environmental Impact Assessment (EIA). Although adopted over 15 years ago by the World Bank, Environmental Management Plans (EMPs) were only semi-formalised in the UK in 2008 and arguably provide a continuous link or ‘bridge’ between the EIA process pre-consent and an Environmental Management System (EMS) post-consent. Drawing on twenty-one semi-structured interviews with stakeholders and thematic analysis of their responses, and a broad-scale practitioner survey, this study aimed to assess the effectiveness of EMPs as an environmental protection tool across the project lifecycle for major developments. The findings revealed a mixed picture of EMP effectiveness in practice, with EMPs only partially fulfilling a bridging role between EIA and EMS. There is no ‘gold standard’ terminology for EMPs, all having slightly different uses, thus presenting different focuses to different stakeholders and further enhancing variation in practice. For many stakeholders, the effectiveness was simply not known, due to the lack of communication and follow-up that still exists. EMP–EMS linkages were shown to be effective from the developer's perspective when a single organisation has involvement across all project phases, though weaknesses occur when multiple parties are involved. Among other stakeholders, knowledge varied significantly; whilst some were in agreement that the linkages worked, many were unaware of the connections and thought of them as two quite separate tools. Stakeholders advocated for the need to make EMPs a legal requirement; for improved communication between stakeholders during EMP implementation and increased documentation of project outcomes; and for EMPs to be consistently written by environmental professionals. Furthermore, weak links in the current process may be

  19. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL`s ER and WM programs as managed by DOE`s Idaho Field Office (DOE-ID).

  20. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    International Nuclear Information System (INIS)

    1993-03-01

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL's ER and WM programs as managed by DOE's Idaho Field Office (DOE-ID)

  1. Martin Marietta Energy Systems Environmental Management Plan, FY 1985-1989

    International Nuclear Information System (INIS)

    Furth, W.F.; Cowser, K.E.; Jones, C.G.; Mitchell, M.E.; Perry, T.P.A.; Stair, C.L.; Stinton, L.H.

    1985-05-01

    This plan contains the most recent revisions (as of April 1, 1985) identifying and resolving environmental problems during the next five years at the four installations managed for DOE by Martin Marietta Energy Systems, Inc. (Energy Systems). These installations are Oak Ridge National Laboratory (ORNL), Oak Ridge Gaseous Diffusion Plant (ORGDP), Oak Ridge Y-12 Plant (Y-12), and Paducah Gaseous Diffusion Plant (PGDP). The report is not an exhaustive catalogue of environmental programs for which funds will be or have been requested. The thrust is to categorize the environmental challenges by the nature of the challenge. The challenges are identified by categories: (1) radioactive waste, (2) hazardous waste, (3) co-contaminated waste (hazardous and radioactive contaminated), (4) conventional waste, (5) monitoring, and (6) remedial actions and decommissioning

  2. Martin Marietta Energy Systems Environmental Management Plan, FY 1985-1989

    Energy Technology Data Exchange (ETDEWEB)

    Furth, W.F.; Cowser, K.E.; Jones, C.G.; Mitchell, M.E.; Perry, T.P.A.; Stair, C.L.; Stinton, L.H.

    1985-05-01

    This plan contains the most recent revisions (as of April 1, 1985) identifying and resolving environmental problems during the next five years at the four installations managed for DOE by Martin Marietta Energy Systems, Inc. (Energy Systems). These installations are Oak Ridge National Laboratory (ORNL), Oak Ridge Gaseous Diffusion Plant (ORGDP), Oak Ridge Y-12 Plant (Y-12), and Paducah Gaseous Diffusion Plant (PGDP). The report is not an exhaustive catalogue of environmental programs for which funds will be or have been requested. The thrust is to categorize the environmental challenges by the nature of the challenge. The challenges are identified by categories: (1) radioactive waste, (2) hazardous waste, (3) co-contaminated waste (hazardous and radioactive contaminated), (4) conventional waste, (5) monitoring, and (6) remedial actions and decommissioning.

  3. Guidance document for the preparation of waste management plans for the Environmental Restoration Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Clark, C. Jr.

    1993-07-01

    A project waste management (WM) plan is required for all Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program remedial investigation, decommission and decontamination (D ampersand D), and remedial action (RA) activities. The project WM plan describes the strategy for handling, packaging, treating, transporting, characterizing, storing, and/or disposing of waste produced as part of ORNL ER Program activities. The project WM plan also contains a strategy for ensuring worker and environmental protection during WM activities

  4. US Department of Energy Oak Ridge Operations Environmental Management Public Involvement Plan for the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    1996-03-01

    This document was prepared in accordance with CERCLA requirements for writing community relations plans. It includes information on how the DOE Oak Ridge Operations Office prepares and executes Environmental Management Community relations activities. It is divided into three sections: the public involvement plan, public involvement in Oak Ridge, and public involvement in 1995. Four appendices are also included: environmental management in Oak Ridge; community and regional overview; key laws, agreements, and policy; and principal contacts

  5. Towards integrated water resources management in Colombia: challenges and opportunities for spatial environmental planning

    Science.gov (United States)

    Salazar, Sergio; Hernández, Sebastián

    2015-04-01

    Only until 2010 was enacted the first national policy related to the integrated management of water resources in Colombia. In 2011 was established the Directorate for Integrated Water Resources Management within the Ministry of Environment and Sustainable Development. Between 2010 to 2013 were adopted the regulatory instruments to be developed within the hierarchical structure for spatial environmental planning around the water resources, considering both a transdisciplinary framework and a multi-ethnic and multi-participatory approach. In this context, there is a breakthrough in the development of strategic and tactic actions summarized as follows: i) technical guidelines or projects were developed for the spatial environmental planning at the macroscale river basins (i.e. Magdalena-Cauca river basin with 2.3 million hectares), meso-scale (river basins from 50.000 to 2 million hectares and aquifers) and local scale (catchments areas less than 50.000 hectares); ii) there is an advance in the knowledge of key hydrological processes in the basins of the country as well as actions to restore and preserve ecosystems essential for the regulation of water supply and ecosystem services; iii) demand characterization introducing regional talks with socio-economic stakeholders and promoting water efficiency actions; iv) water use regulation as a way for decontamination and achieving quality standards for prospective uses; v) introduction of risks analysis associated with water resources in the spatial environmental planning and establishment of mitigation and adaptation measures; vi) strengthening the monitoring network of water quality and hydrometeorological variables; vii) strengthening interactions with national and international research as well as the implementation of a national information system of water resources; viii) steps towards water governance with the introduction of socio-economic stakeholder in the spatial environmental planning and implementation of

  6. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Science.gov (United States)

    2010-04-16

    ... Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian... Impact Statement (FEIS) for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake... drought management planning at the Kerr Hydroelectric Project no sooner than 30 days following the...

  7. Water environmental planning and management at the watershed scale:A case study of Lake Qilu,China

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    Water environmental planning and management has become essential for guiding the water pollution control activities.Past water pollution control activities have been site specific,with little thought on water quality standard reaching at the watershed scale.Based on the watershed approach,a seven-step methodological framework for water environmental planning and management was developed.The framework was applied to water environmental planning and management of the Lake Qilu watershed in Yunnan Province,China.Results show that the reduction amount of total nitrogen (TN) under the plan is 1,205 tons per year so that the target of environmental capacity can be reached in 2020.Compared with traditional methods,the framework has its prevalence and could be generalized to analogous watersheds.

  8. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R ampersand D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER ampersand WM) operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER ampersand WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER ampersand WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs

  9. Hanford environmental management program multi-year work plan FY1998

    International Nuclear Information System (INIS)

    Giese, K.A.

    1997-01-01

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year's work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ''Work Authorization'' identifies the impacted scope and requires the Contracting Officer's or Assistant Manager-Contracting Officer's Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ''Project Summary Section'' and Section Two is titled the ''Additional Sections at the Project Baseline Summaries Level''. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS number-sign RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP

  10. Wetland Planning: Current Problems and Environmental Management Proposals at Supra-Municipal Scale (Spanish Mediterranean Coast

    Directory of Open Access Journals (Sweden)

    María-Teresa Sebastiá-Frasquet

    2014-03-01

    Full Text Available The policies that define the use and management of wetlands in Spain have undergone tremendous changes in recent decades. During the period of 1950–1980, Land Reform Plans promoted filling and draining of these areas for agricultural use. In 1986, with the incorporation of Spain to the European Union (EU, there was a sudden change of direction in these policies, which, thereafter, pursued restoring and protecting these ecosystems. This change, combined with increasing urban development and infrastructure pressures (e.g., roads, golf courses, etc., creates a conflict of uses which complicates the management of these ecosystems by local governments. This study analyzes the effectiveness of policies and management tools of important coastal wetlands at the local scale in the Valencian Community (Western Mediterranean Sea using a strengths-weaknesses-opportunities-threats (SWOT methodology. A supra-municipal model of environmental planning is proposed to enable consistent management at a regional scale. This model enhances local government’s effectiveness and it can be applied in other areas with similar problems.

  11. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: the city of Belgrade.

    Science.gov (United States)

    Josimović, Boško; Marić, Igor; Milijić, Saša

    2015-02-01

    Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results. Copyright © 2014 Elsevier Ltd. All rights reserved.

  12. 76 FR 70483 - Environmental Impact Statement and General Management Plan, Paterson Great Falls National...

    Science.gov (United States)

    2011-11-14

    ... planning process and will remain actively involved throughout the development of the plan. Prepared by... the long-term management of Paterson Great Falls NHP early in the process through public meetings and... Impact Statement and General Management Plan, Paterson Great Falls National Historical Park, NJ AGENCY...

  13. 77 FR 1720 - Final Environmental Impact Statement for the White-Tailed Deer Management Plan, Rock Creek Park

    Science.gov (United States)

    2012-01-11

    ... Environmental Impact Statement for the White-Tailed Deer Management Plan, Rock Creek Park AGENCY: National Park...), Rock Creek Park, Washington, DC The Plan will support long-term protection, preservation, and restoration of native vegetation and other natural and cultural resources in Rock Creek Park. DATES: The NPS...

  14. Integrated wastewater management planning for DOE's Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    Hopkins, J.; Barthel, J.; Wheeler, M.; Conroy, K.

    1996-01-01

    Rocky Mountain Remediation Services, L.L.C. (RMRS), jointly formed by Morrison Knudsen Corporation and BNFL Inc., provides international experience in the nuclear, environmental, waste management, decontamination and decommissioning (D ampersand D) , and project management industry. The company is currently the environmental restoration, waste management, and D ampersand D subcontractor for Kaiser-Hill Company at the Rocky Flats Environmental Technology Site (RFETS). RMRS offers unique solutions and state-of-the-art technology to assist in resolving the issues that face industries today. RMRS has been working on methods to improve cost savings recognized at RFETS, through application of unique technologies and process engineering. RMRS prepared and is implementing a strategy that focused on identifying an approach to improve cost savings in current wastewater treatment systems and to define a low-cost, safe and versatile wastewater treatment system for the future. Development of this strategy, was targeted by Department of Energy (DOE) Headquarters, DOE Rocky Flats Field Office and Kaiser-Hill as a ''Project Breakthrough'' where old concepts were thrown out the door and the project goals and objectives were developed from the groundup. The objectives of the strategy developed in a project break through session with DOE included lower lifecycle costs, shutdown of one of two buildings at RFETS, Building 374 or Building 774, reduced government capital investment, and support of site closure program goals, identified as the site's Accelerated Site Action Plan (ASAP). The recommended option allows for removal of water treatment functions from Building 374, the existing process wastewater treatment facility. This option affords the lowest capital cost, lowest unit operating cost, lowest technical management risk, greatest support of ASAP phasing and provides the greatest flexibility for design with unforeseen future needs

  15. Comprehensive Environmental Management Process

    International Nuclear Information System (INIS)

    Hjeresen, D.L.; Roybal, S.L.

    1994-01-01

    This report contains information about Los Alamos National Laboratory's Comprehensive Environmental Management Plan. The topics covered include: waste minimization, waste generation, environmental concerns, public relations of the laboratory, and how this plan will help to answer to the demands of the laboratory as their mission changes

  16. Environmental Management Plan for the Chemical Engineering Laboratory (LIQ) of the National University of Colombia, Bogotá

    OpenAIRE

    Javier Gama Chávez; Martha Lozano García; Paulo César Narváez Rincón; Óscar Javier Suárez Medina

    2004-01-01

    An Enviromental Management Plan was formulated with the objective of improving the environmental performance of the Chemical Engineering Laboratory (LIQ). The plan was supported on the principles established by the ISO 140001 standard. In a first step, an environmental politic was proposed. Next, by means of an initial review of the laboratory, the most significant impacts related to the activities developed in the Laboratory were identified: dangerous chemical wastes accumulation, water cont...

  17. Environmental Management

    DEFF Research Database (Denmark)

    Lehmann, Martin

    The doctoral research project is co-financed by DUCED-I&UA and is part of a joint effort of Thai, Malay, South African and Danish universities to conduct collaborative research on the overarching theme "Environmental Management: Globalisation and Industrial Governance in Developing Countries......". The PhD project is expected to conclude ultimo 2005. Environmental management and cleaner production (CP) are both internationally recognised as tools for minimising environmental impacts of production or services. However, several studies have shown that especially SMEs, which probably amount to more...

  18. Environmental implementation plan: Chapter 5, Chemical management, pollution prevention and other compliance programs

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1993-01-01

    Compliance with environmental regulations and US Department of Energy Orders (DOE) relating to environmental protection is an important part of SRS's program. Over the past few years, the number of environmental regulations has increased. The strategy to comply with new and existing environmental regulations and DOE orders is described in chapter two. In this chapter, the following environmental programs are described: Toxic Substances Control Act (TSCA); Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA); Emergency Planning and Community Right-to-Know Act (EPCRA); and SPCC/BMP/Pollution Prevention Plans;The implementation section identifies issues and those responsible to achieve defined objectives

  19. 78 FR 68469 - Draft General Management Plan/Wilderness Study/Environmental Impact Statement, Channel Islands...

    Science.gov (United States)

    2013-11-14

    ... decision making, which will allow managers to effectively address future opportunities and problems, such... will serve as the basis for future detailed management documents, such as five-year strategic plans and...

  20. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, {approximately} 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner.

  1. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-06-01

    This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, ∼ 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner

  2. Oak Ridge Reservation site management plan for the environmental restoration program

    International Nuclear Information System (INIS)

    1995-09-01

    This report describes the overall approach for addressing environmental contamination on the Oak Ridge Reservation (ORR) National Priorities List site located in east Tennessee. The cleanup strategy reflected in this site management plan (SMP) has been developed to accelerate the transition of areas of concern (AOCs) from characterization to remediation by making decisions at the watershed scale based on recommended land uses. Project scoping involves the use of defined remedial action objectives, which are based in part on the land uses selected for the project sites. To provide a consistent land use approach that accommodates the needs of all stakeholders responsible for the remediation and reutilization of the ORR, a reservation-wide strategy has been developed. The Common Ground process is a stakeholder-driven process to determine preferred land use options for the ORR so that clean-up operations will be based on the most likely and acceptable land uses. DOE utilized the information gathered in the Common Ground process to recommend desired land uses for the ORR. The land uses recommended by DOE as a result of the Common Ground process are being used for planning land and facility use/reuse for the next 25 years. Land uses recommended for the ORR in conducting CERCLA remedial activities are conservation, industrial use, and waste management

  3. Environmental Management Plan for the Chemical Engineering Laboratory (LIQ of the National University of Colombia, Bogotá

    Directory of Open Access Journals (Sweden)

    Javier Gama Chávez

    2004-01-01

    Full Text Available An Enviromental Management Plan was formulated with the objective of improving the environmental performance of the Chemical Engineering Laboratory (LIQ. The plan was supported on the principles established by the ISO 140001 standard. In a first step, an environmental politic was proposed. Next, by means of an initial review of the laboratory, the most significant impacts related to the activities developed in the Laboratory were identified: dangerous chemical wastes accumulation, water contamination by effusions generation and air contamination. These impacts were the base for formulating following and control programs, furthermire, a training an communication program was done. All the programs, including the requiered documents and procedures, were published in the Environmental Management Plan and the Environmental Procedures Manual.

  4. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex

  5. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  6. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  7. Environmental management

    International Nuclear Information System (INIS)

    Girard, M.; Mondino, M.

    2000-01-01

    Nowadays, unlike in the past, companies have to operate in a context of sustainable development, in which the economic and social development, production and consumption have to take into account the medium and long term impact on environment. The article sets forth some considerations about these subjects, which are assuming a growing importance in the management of companies: the variable environment may for instance be a factor of discrimination between being competitive or not. In order to characterise the context within which the environmental management has to be applied, some basic concepts about environmental management systems, Life Cycle Assessment, and Eco labeling are illustrated. As an example of application of the methodology described, a brief reference to the Italgas Group Environmental Report is given [it

  8. Environmental management plan of the mining and industrial uranium complex in Brazil

    International Nuclear Information System (INIS)

    Figuereido, N.; Hilton, M.; Wiikman, L.; Oliveira, M.; Taddei, J.

    1996-01-01

    The Mining and Industrial Complex of the Pocos de Caldas Plateau (CIPC) is located at Caldas, county in the southwest of Minas Gerais state. It is a plant of the Industrias Nucleares do Brazil S.A. -INB, the only installation in Brazil for the production of uranium concentrate (yellow-cake) as ammonium diuranate (Adu). The Environmental protection and control program in practice assures the environmental management plan, in operation, maintaining the Complex within technology standards required by updated environmental concepts. The mine is an open pit operation with a surface diameter of 1000 m and an actual average depth of 120 m. Some 44 x 10 6 m 3 of the overburden material were used in embankments structures to civil engineering works in the implantation of several installations in CIPC, and the other portion of the removed material was deposited in two pre-selected areas having both an upper area of about 2,0 x 10 6 m 2 . The annual average volume of waters transported to chemical treatment is about 9,0 x 10 5 m 3 . The mill, in its full operation, processes 2500 t of ore per day and the solid and liquid tailings are directed to a waste pond system where are contained approximately 2,0 x 10 6 m 3 (2,2 x 10 6 t) of solid wastes with an estimation of further 70 x 10 5 m 3 to be disposed. The upper surface of tailings pond is about 2,0 x 10 5 m 2 . Nowadays, the environmental protection and control program aims to the development of potential pollutant areas stabilization reintegrating them into their original features or adjusting them to other forms of laudable restoration. (authors). 1 fig

  9. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ''Partnership in Environmental Excellence'' formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex

  10. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  11. Lake Mead National Recreational Area air tour management plan and planning and National Environmental Policy Act scoping document

    Science.gov (United States)

    2004-04-19

    The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of an Air Tour Management Plan (ATMP) for Lake Mead National Recreation Area (LAME) pursuant to the National Parks Air Tour ...

  12. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: The city of Belgrade

    International Nuclear Information System (INIS)

    Josimović, Boško; Marić, Igor; Milijić, Saša

    2015-01-01

    Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results

  13. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: The city of Belgrade

    Energy Technology Data Exchange (ETDEWEB)

    Josimović, Boško, E-mail: bosko@iaus.ac.rs; Marić, Igor; Milijić, Saša

    2015-02-15

    Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results.

  14. The US DOE Office of Environmental Management International Cooperative Program: Current Status and Plans for Expansion

    International Nuclear Information System (INIS)

    Gerdes, K.D.; Han, A.M.; Marra, J.C.; Fox, K.M.; Peeler, D.K.; Smith, M.E.; Jannik, G.T.; Farfan, E.B.; Kim, D.S.; Vienna, J.D.; Roach, J.A.; Aloy, A.S.; Stefanovsky, S.V.; Bondarkov, M.D.; Lopukh, D.P.; Kim, C.W.

    2009-01-01

    The Department of Energy Office of Environmental Management (DOE-EM) Office of Engineering and Technology is responsible for implementing EM's international cooperative program. The Office of Engineering and Technology's international efforts are aimed at supporting EM's mission of risk reduction and accelerated cleanup of the environmental legacy of the nation's nuclear weapons program and government-sponsored nuclear energy research. To do this, EM pursues collaborations with government organizations, educational institutions, and private industry to identify and develop technologies that can address the site cleanup needs of DOE. Currently, DOE-EM is performing collaborative work with researchers at the Khlopin Radium Institute (KRI) and the SIA Radon Institute in Russia and the Ukraine's International Radioecology Laboratory (IRL). Additionally, a task was recently completed with the Nuclear Engineering Technology Institute (NETEC) in South Korea. The objectives of these collaborations were to explore issues relating to high-level waste management and to investigate technologies that could be leveraged to support EM site cleanup needs. The initiatives in Russia and South Korea were aimed at evaluating and advancing technologies to support U.S. high-level waste vitrification initiatives. The work at KRI was targeted at improving the throughput of current vitrification processes by increasing melting rate and/or waste loading. The objectives of the efforts conducted at SIA Radon and NETEC were to evaluate advanced melter technologies to make dramatic increases in waste loading and throughput. The collaborative effort conducted with the IRL in the Ukraine has the following objectives: - Assess the long-term impacts to the environment from radiation exposure within the Chernobyl Exclusion Zone (ChEZ); - Provide information on remediation guidelines and ecological risk assessment within radioactively contaminated territories based on the results of long-term field

  15. Environmental monitoring plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs

  16. Environmental management in public hospitals: Environmental management in Colombia

    OpenAIRE

    Juan Pablo Rodríguez-Miranda; César Augusto García-Ubaque; María Camila García-Vaca

    2016-01-01

    Introduction: Activities in hospitals have environmental impacts which may pose risks to human and environmental health if they are not managed correctly. For this reason, it is necessary to implement an environmental management plan in hospitals that not only focuses on solid waste management but includes all aspects associated with health within institutions. Objective: To review environmental management aspects related to public hospitals in order to identify environmental management a...

  17. Engaging Watershed Stakeholders for Cost-Effective Environmental Management Planning with "Watershed Manager"

    Science.gov (United States)

    Williams, Jeffery R.; Smith, Craig M.; Roe, Josh D.; Leatherman, John C.; Wilson, Robert M.

    2012-01-01

    "Watershed Manager" is a spreadsheet-based model that is used in extension education programs for learning about and selecting cost-effective watershed management practices to reduce soil, nitrogen, and phosphorus losses from cropland. It can facilitate Watershed Restoration and Protection Strategy (WRAPS) stakeholder groups' development…

  18. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    In FY 1990 Robotics Technology Development Program (RTDP) planning teams visited five DOE sites. These sites were selected by the Office of Technology Development to provide a needs basis for developing a 5-Year Plan. Visits to five DOE sites provided identification of needs for robotics technology development to support Environmental Restoration and Waste Management (ER ampersand WM) projects at those sites. Additional site visits will be conducted in the future to expand the planning basis. This volume summarizes both the results of the site visits and the needs and requirements of the priority ER ampersand WM activities at the sites, including potential needs for robotics and remote systems technology. It also discusses hazards associated with the site activities and any problems or technical uncertainties associated with dealing with the hazards in the performance of the ER ampersand WM work. Robotic or remote systems currently under development for remediation projects or waste operations are also discussed. The information in this document is organized principally by site, activity, and priority. Section 2.0, Site Needs, is based on information from the site visit reports and provides a summary which focuses on the site needs and requirements for each priority activity. Section 2.0 also records evaluations and discussions by the RTDP team following the site visit. Section 3.0, Commonality Assessment, documents similar site needs where common, or cross-cutting, robotics technology might be applied to several activities. Section 4.0 contains a summary of the site needs and requirements in tabular form. 1 tab

  19. Environmental implementation plan

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1994-01-01

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities

  20. Water management, environmental protection and spatial planning reconciliation: "Accommodating" the Danube and the Tisa river in Serbia

    Directory of Open Access Journals (Sweden)

    Pihler Vladimir

    2013-01-01

    Full Text Available Water management in Serbia has been mostly operating in a framework of public companies and institutions focused on strictly sectorial and technical expertise on hydraulic engineering, environmental protection and navigable traffic engineering within the highly autonomous legislative framework. On the cross-point of spatial planning and water management there is a growing debate on the important discourses of the policy domains. Seeing rivers as an “accommodated” generator of opportunities is a statement which is opposing the traditional consideration of strict separation of water from the land. Spatial planning as a framework for regulating the land use has an important function in integrating the water management and landscape more closely. In Serbian spatial planning practice there is growing practice of area-specific development planning (reflected through the Spatial plans for the special-purpose areas which are considered to accommodate new ideas on spatiality better than the traditional, sectorial planning documents. The question is placed as to how these practices could direct new spatial arrangements of integrative collaborative spatial planning and not just merely reflect the framework of the existing planning order. This paper seeks the potential and actual role of spatial planning in addressing challenges related to particular river environments on the Tisa and the Danube rivers. The research is based on the analysis of two Spatial plans for the special-purpose areas which are still in conceptual phase - The Cultural landscape of Bač and Multifunctional ecological corridor of the Tisa river.

  1. 75 FR 53980 - Notice of Availability of the Record of Decision; Elk Management Plan/Environmental Impact...

    Science.gov (United States)

    2010-09-02

    ... March 8, 2010. The Preferred Alternative will make use of skilled public volunteers to assist the Park... DEPARTMENT OF THE INTERIOR National Park Service Notice of Availability of the Record of Decision; Elk Management Plan/Environmental Impact Statement for Theodore Roosevelt National Park ACTION: Notice...

  2. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  3. Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed

  4. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  5. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program's management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention

  6. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program`s management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention.

  7. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  8. Burlington Bottoms Wildlife Mitigation Project. Final environmental assessment/management plan and finding of no significant impact

    International Nuclear Information System (INIS)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property

  9. Tank waste remediation system environmental program plan

    Energy Technology Data Exchange (ETDEWEB)

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  10. Tank waste remediation system environmental program plan

    International Nuclear Information System (INIS)

    Borneman, L.E.

    1998-01-01

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996)

  11. CEBAF - environmental protection program plan

    International Nuclear Information System (INIS)

    1995-01-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan

  12. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as ''the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as ''the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs

  13. Environmental Management System

    Science.gov (United States)

    Goals Recycling Green Purchasing Pollution Prevention Reusing Water Resources Environmental Management Stewardship » Environmental Protection » Environmental Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the

  14. Environmental Education Strategic Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    This document is designed to guide the Environmental Education and Development Branch (EM-522) of the EM Office of Technology (OTD) Development, Technology Integration and Environmental Education Division (EM-52) in planning and executing its program through EM staff, Operations Offices, National Laboratories, contractors, and others.

  15. Report on Saginaw Bay Area Environmental Policy, Planning and Management survey. Final report, April 1991-March 1992

    Energy Technology Data Exchange (ETDEWEB)

    He, C.; Zhao, W.; Edens, T.C.

    1992-04-01

    An environmental policy, planning, and management survey was conducted in the Saginaw Bay area in the Fall of 1991. The survey identified unemployment, factory closure and environmental quality degradation as the major economic and environmental problems in the area. Surface water contamination, excessive nutrients and zebra mussel infestation were the most serious problems affecting water quality. Soil erosion, excessive fertilization and pesticide applications were the most important non-point sources of water pollution. Toxic chemicals, phosphorus, suspended solids, heavy metals were the major water pollutants in the area. Pollution cleanup, land use planning, and control of zebra mussels were identified as the top implementation priorities for the area. Recommendations made by the respondents for improving environmental quality are summarized in the report.

  16. Environmental Monitoring Plan, Revision 6

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting

  17. Routine Radiological Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Bechtel Nevada

    1998-01-01

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs

  18. 75 FR 15457 - Notice of Availability of Final Elk Management Plan and Environmental Impact Statement for...

    Science.gov (United States)

    2010-03-29

    ...://parkplanning.nps.gov/THRO ); click on the link to Elk Management Plan/ EIS. You may also obtain a copy of the.... The Park would not pay private contractors or outside individuals to shoot elk. The initial reduction..., by removing approximately 275 elk per year. Following the initial reduction phase, the Park would...

  19. 77 FR 14414 - Notice of Intent To Revise Resource Management Plans and an Associated Environmental Impact...

    Science.gov (United States)

    2012-03-09

    ...? Economics and Community Support--How should BLM- administered-lands be managed to contribute to local... involved in the planning process: Timber, wildlife and fisheries, economics, botany, climate change/carbon sequestration, lands and realty, hydrology, soils, cultural [[Page 14416

  20. Social and environmental issues in developing vegetation and fire management plans

    Science.gov (United States)

    Leonard Charles

    1995-01-01

    To reduce the risk of wildfire in the California urban interface often requires actions that will be viewed by members of the public as having adverse effects on such resources as wildlife, vegetation, views, air quality, and recreational opportunities. These citizens can substantially delay and even thwart development of fire management plans. In developing such a...

  1. 78 FR 5494 - Off-Road Vehicle Management Plan, Draft Environmental Impact Statement, Lake Meredith National...

    Science.gov (United States)

    2013-01-25

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-IMR-LAMR-10224; 2310-0091-422] Off-Road... Service (NPS) is releasing a Draft Environmental Impact Statement (DEIS) for the Off- Road Vehicle... impacts of four alternatives that address off-road vehicle (ORV) management in the national recreation...

  2. An Integrated Decentralized Energy Planning Model considering Demand-Side Management and Environmental Measures

    Directory of Open Access Journals (Sweden)

    Seyed Mahmood Kazemi

    2013-01-01

    Full Text Available Decentralized energy planning (DEP is looked upon as an indisputable opportunity for energy planning of villages, isolated islands, and far spots. Nonetheless, at this decentralized planning level, the value of demand-side resources is not fairly examined, despite enjoying great advantages. Therefore, the core task of this study is to integrate demand-side resources, as a competing solution against supply-side alternatives, with decentralized energy planning decisions and demonstrate the rewarding role it plays. Moreover, sustainability indicators (SIs are incorporated into DEP attempts in order to attain sustainable development. It is emphasized that unless these indicators are considered at lower energy planning levels, they will be ignored at higher planning levels as well. Hence, to the best knowledge of the authors, this study for the first time takes into account greenhouse gas (GHG emissions produced by utilization of renewable energies in DEP optimization models. To address the issues mentioned previously, multiobjective linear programming model along with a min-max goal programming approach is employed. Finally, using data taken from the literature, the model is solved, and the obtained results are discussed. The results show that DSM policies have remarkably contributed to significant improvements especially in terms of environmental indicators.

  3. Environmental Planning and Ecology Program Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2008-01-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  4. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs.

  5. Informing Environmental Water Management Decisions: Using Conditional Probability Networks to Address the Information Needs of Planning and Implementation Cycles

    Science.gov (United States)

    Horne, Avril C.; Szemis, Joanna M.; Webb, J. Angus; Kaur, Simranjit; Stewardson, Michael J.; Bond, Nick; Nathan, Rory

    2018-03-01

    One important aspect of adaptive management is the clear and transparent documentation of hypotheses, together with the use of predictive models (complete with any assumptions) to test those hypotheses. Documentation of such models can improve the ability to learn from management decisions and supports dialog between stakeholders. A key challenge is how best to represent the existing scientific knowledge to support decision-making. Such challenges are currently emerging in the field of environmental water management in Australia, where managers are required to prioritize the delivery of environmental water on an annual basis, using a transparent and evidence-based decision framework. We argue that the development of models of ecological responses to environmental water use needs to support both the planning and implementation cycles of adaptive management. Here we demonstrate an approach based on the use of Conditional Probability Networks to translate existing ecological knowledge into quantitative models that include temporal dynamics to support adaptive environmental flow management. It equally extends to other applications where knowledge is incomplete, but decisions must still be made.

  6. Informing Environmental Water Management Decisions: Using Conditional Probability Networks to Address the Information Needs of Planning and Implementation Cycles.

    Science.gov (United States)

    Horne, Avril C; Szemis, Joanna M; Webb, J Angus; Kaur, Simranjit; Stewardson, Michael J; Bond, Nick; Nathan, Rory

    2018-03-01

    One important aspect of adaptive management is the clear and transparent documentation of hypotheses, together with the use of predictive models (complete with any assumptions) to test those hypotheses. Documentation of such models can improve the ability to learn from management decisions and supports dialog between stakeholders. A key challenge is how best to represent the existing scientific knowledge to support decision-making. Such challenges are currently emerging in the field of environmental water management in Australia, where managers are required to prioritize the delivery of environmental water on an annual basis, using a transparent and evidence-based decision framework. We argue that the development of models of ecological responses to environmental water use needs to support both the planning and implementation cycles of adaptive management. Here we demonstrate an approach based on the use of Conditional Probability Networks to translate existing ecological knowledge into quantitative models that include temporal dynamics to support adaptive environmental flow management. It equally extends to other applications where knowledge is incomplete, but decisions must still be made.

  7. Study on environmental friendly national park management plan: concentrated on the support plan for national park residents

    Energy Technology Data Exchange (ETDEWEB)

    Park, Yong Ha; Byun, Byoung Seol; Chung, Hoe Seong; Kim, Mi Sook; Kim, Jeong Won; Joo, Yong Joon [Korea Environment Institute, Seoul (Korea)

    1999-12-01

    National parks in Korea have been selected for preserving beautiful sceneries of nature or diversity of organisms. Today as the increase of population and industrialization has caused the increase of natural resource demand, it is difficult to preserve all ecosystems equally. Therefore the national park system has established to prevent the damage to an ecosystem or to preserve a region that can be damaged by selecting a valuable area. The objective of this study is to recommend an efficient support plan for national park residents, to induce their activities to be environmental friendly and to preserve an ecosystem in a national park. To achieve this, the similar systems, laws and cases in the advanced countries have compared and reviewed and a support plan for residents appropriate for Korean situation has discussed. 41 refs., 4 figs., 33 tabs.

  8. 2002 WIPP Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-09-30

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  9. Environmental management and emergency preparedness plan for Tsunami disaster along Indian coast

    Directory of Open Access Journals (Sweden)

    P Chandramohan

    2017-12-01

    Full Text Available The 26 December 2004 Tsunami generated by the submarine earthquake in Andaman Sea with the magnitude of 9.2 Richter scale triggered the worst destruction, widespread inundation and extensive damage in terms of life and property along the Tamil Nadu coast and Andaman Nicobar Group of Islands. The shoreline features like dunes, vegetation and steepness of beaches played vital role in attenuating the impact of Tsunami from destruction. While the low-level Marina beach experienced minimum inundation, the coast between Adyar and Cooum was inundated heavily. As the present generation of India was not aware of Tsunami, the emergency plan and preparedness were zero and so the loss of human life was huge. In this article, the authors describe the Tsunami occurred in India on 26 December 2004 and its impacts on morphology. The appropriate Emergency Preparedness plan and the Disaster Management Plan in case of reoccurrence of such natural disaster are discussed.

  10. Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Hunter, S.W.; Gallegos, G.M.; Surano, K.A.; Lamson, K.C.; Tate, P.J.; Balke, B.K.; Biermann, A.H.; Hoppes, W.G.; Fields, B.C.; Gouveia, F.J.; Berger, R.L.; Miller, F.S.; Rueppel, D.W.; Sims, J.M.

    1992-04-01

    The primary tasks of the environmental monitoring section (EMS) Livermore National Laboratory (LLNL) are: effluent monitoring of air, sewer, and NPDES water. Surveillance monitoring of soil, vegetation and foodstuff, water, air particulate, and air tritium. Radiation monitoring, dose assessment, emergency response, quality assurance, and reporting. This report describes LLNL and the monitoring plan

  11. Data management plan for the Oak Ridge Environmental Information System, Version 1.1. Enviornmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-04

    The Data Management Plan (DMP) describes the data management objectives, system components, data base structure and contents, system maintenance, data processing, and user interface for the prototype phase of the Oak Ridge Environmental Information System (OREIS). The major goals of OREIS data management are to compile data of known quality, to maintain the integrity of the data base, and to provide data to users. The DMP defines the requirements, describes the responsibilities, and references the procedures for meeting the data management objectives. Emphasis is on management of measurement data and the associated metadata used to support its proper interpretation and legal defensibility. The DMP covers transmittal, processing, storage, and data access activities associated with OREIS. The OREIS data dictionary is provided as an appendix.

  12. Do Groundwater Management Plans Work? A statistical evaluation of the effectiveness of groundwater management plans towards achieving water supply and environmental objectives under a changing climate.

    Science.gov (United States)

    White, E.; Peterson, T. J.; Costelloe, J. F.; Western, A. W.; Carrara, E.

    2017-12-01

    Regulation of groundwater through the use of management plans is becoming increasingly prevalent as global groundwater levels decline. But plans are seldom systematically and quantitatively assessed for effectiveness. Instead, the state of an aquifer is commonly considered a proxy for plan effectiveness despite a lack of casaulity. Groundwater managers face myraid challenges such as finite resources, conflicting uses and the uncertainty inherent in any groundwater investigation. Groundwater models have been used to provide insights into what may happen to the aquifer under various levels of stress. Generally, these models simulate the impact of predefined stresses for a certain time-span. However, this is not how management occurs in reality. Managers only see a fraction of the aquifer and use this limited knowledgeto make aquifer-wide decisions. Also, management changes over time in response to aquifer state, and groundwater management plans commonly contain trigger levels in monitoring wells that prompt management intervention. In this way there is a feedback between the aquifer state and management that is rarely captured by groundwater management models. To capture this management/aquifer feedback, groundwater management was structured as a systems control problem, and using this framework, a testability assessment rubric developed. The rubric was applied to 15 Australian groundwater management plans and 47% of plans were found to be testable. To numerically quantify the effectiveness of groundwater managment, the impact of extraction restrictions was probabilistically assessed by simulating "the act of management" of a simple unconfined groundwater system using MODFLOW and Flopy. Water managers were privy only to head levels in a varying number of grid cells assigned as monitoring wells, and used that limited information to make allocation decisions at each time step. Extraction rates for each simulated management period were determined based upon the observed

  13. Environmental Requirements Management

    Energy Technology Data Exchange (ETDEWEB)

    Cusack, Laura J.; Bramson, Jeffrey E.; Archuleta, Jose A.; Frey, Jeffrey A.

    2015-01-08

    CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

  14. Management and Planning for Small Community Wastewater

    Science.gov (United States)

    Operators Small Systems Management and Planning for Small Community Wastewater The NESC has provided of Clean Water Agencies (NACWA) Achieving Environmental Excellence: An Environmental Management Agencies, The Office of Wastewater Management at EPA, in cooperation with the Global Environment and

  15. Uranium Mill Tailings Remedial Action Project Environmental Line Management Audit Action Plan. Final report. Audit, October 26, 1992--November 6, 1992

    International Nuclear Information System (INIS)

    1993-07-01

    This Action Plan contains responses, planned actions, and estimated costs for addressing the findings discovered in the Environmental Management Audit conducted for the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRA), October 26 through November 6, 1992. This document should be read in conjunction with the Audit Report to ensure the findings addressed in this document are fully understood. The scope of the UMTRA Environmental Management Audit was comprehensive and encompassed all areas of environmental management except environmental programs pertaining to the National Environmental Policy Act (NEPA) compliance. The Audit Report listed 18 findings: 11 were identified as compliance findings, and the remaining 7 were best management practice findings. Root cause analysis was performed on all the findings. The results of the analysis as well as planned corrective actions are summarized in Section 5.0. All planned actions were prioritized using the Tiger Team Assessment Corrective Action Plan system. Based on assigned priorities, all planned actions were costed by fiscal year. This Action Plan contains a description of the organizational and management structures to be used to implement the Action Plan, a brief discussion of root cause analysis and funding, followed by the responses and planned actions for each finding. A member of the UMTRA Project Office (PO) has been assigned responsibility for tracking the progress on each of the findings. The UMTRA PO staff wrote and/or approved all of the corrective actions recorded in this Action Plan

  16. Environmental Monitoring Plan, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Blake, R G; Bertoldo, N A; Campbell, C G; Coty, J; Folks, K; Grayson, A R; Jones, H E; Nelson, J C; Revelli, M A; Wegrecki, T; Williams, R A; Wilson, K

    2010-01-27

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for

  17. Interactive environmental planning

    DEFF Research Database (Denmark)

    Freudendal-Pedersen, Malene; Hartmann-Petersen, Katrine; Kjærulff, Aslak A.

    2017-01-01

    This article presents a research project on mobility management in Danish municipalities aimed at creating more sustainable mobilities. The project, called Formula M (2011–2014), worked within sciences, public and private sectors, and civil society. Often contemporary projects in both planning an...

  18. 78 FR 23491 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2013-04-19

    ... Management Planning; Correction AGENCY: Forest Service, USDA. ACTION: Correcting amendment. SUMMARY: This..., revising, and monitoring land management plans (the planning rule). The National Forest Management Act... Land Management Planning Rule Final Programmatic Environmental Impact Statement of January 2012. List...

  19. Electronic document management system analysis report and system plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    Frappaolo, C.

    1995-09-01

    Lockheed Martin Energy Systems, Inc. (LMES) has established and maintains Document Management Centers (DMCs) to support Environmental Restoration Program (ER) activities undertaken at three Oak Ridge facilities: Oak Ridge National Laboratory, Oak Ridge K-25 Site, Oak Ridge Y-12 Plant; and two sister sites: Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio, and Paducah Gaseous Diffusion Plant in Paducah, Kentucky. The role of the DMCs is to receive, store, retrieve, and properly dispose of records. In an effort to make the DMCs run more efficiently and to more proactively manage the records' life cycles from cradle to grave, ER has decided to investigate ways in which Electronic Document Management System (EDMS) technologies can be used to redefine the DMCs and their related processes. Specific goals of this study are tightening control over the ER documents, establishing and enforcing record creation and retention procedures, speeding up access to information, and increasing the accessibility of information. A working pilot of the solution is desired within the next six months. Based on a series of interviews conducted with personnel from each of the DMCs, key management, and individuals representing related projects, it is recommended that ER utilize document management, full-text retrieval, and workflow technologies to improve and automate records management for the ER program. A phased approach to solution implementation is suggested starting with the deployment of an automated storage and retrieval system at Portsmouth. This should be followed with a roll out of the system to the other DMCs, the deployment of a workflow-enabled authoring system at Portsmouth, and a subsequent roll out of this authoring system to the other sites

  20. Environmental management system

    International Nuclear Information System (INIS)

    2004-01-01

    An Environmental Management System was implemented in ANAV in 1999, including the two nuclear sites of the Asco and Vandellos II nuclear power plants. This implementation entailed formulation of the ANAV Environmental Policy, preparation of an Environmental Management Plan (PLAGMA) supported by the Environmental Aspects Manuals (MASMA) of each site and their operating procedures, modification of the organizational structure to create the Environment Unit, in charge of implementing the SIGEMA, and the Environment Committee, the governing body that reviews the results obtained and environmental goals to be achieved, and direct involvement of all the different ANAV organization in continuous improvement of the SIGEMA implementation. Special attention is paid to evolution of the environmental indicators, to communication and specific training in environmental issues, and to waste management and the different programs for increasing waste recycling and assessment, as well as to minimization programs. The article details the different approaches used to improve the environmental results in these last five years, which have allowed ANAV to maintain the ISO-14001 Certification since 1999. (Author)

  1. Final Environmental Assessment Addressing Implementation of the Integrated Natural Resources Management Plan for Kirtland Air Force Base

    Science.gov (United States)

    2014-09-01

    e.g., photovoltaic panels, solar collection, heat recovery systems, wind turbines , green roofs, and habitat-oriented storm water management) would...comprehensive range planning, cultural resources management planning, Bird /Wildlife Aircraft Strike Hazard planning, and pest management planning. In addition...manage wildlife resources. Assessment of wildlife populations at Kirtland AFB (e.g., bats, birds , predators, and herptiles) would provide a baseline that

  2. Final environmental impact statement for the Nevada Test Site and off-site locations in the State of Nevada. Framework for the resource management plan, Volume 2

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this document is to publicize how the U.S. Department of Energy Nevada Operations Office (DOE/NV) proposes to develop and use a Resource Management Plan for the Nevada Test Site (NTS) so the public could comment on and assist in the following activities: (1) Developing the methods for creating and using the plan; (2) Identifying the values people place on manmade and natural resources found on the NTS; (3) Developing the goals the DOE/NV will use to guide the conservation and use of those resources; (4) Identifying the management actions needed to meet constraints and resource management goals; and (5) Incorporating the principles of ecosystem management into land and resource management on the NTS. This framework for the Resource Management Plan was developed in conjunction with the Environmental Impact Statement for the Nevada Test Site and off-site locations in the state of Nevada (NTS EIS) to take advantage of the extensive data collection and public participation activities associated with the National Environmental Policy Act. After public input was received during the comment period for the Draft NTS EIS, DOE/NV revised this description of the Resource Management Plan and published it with the NTS Final EIS. This revision includes the goals DOE/NV has developed for managing resources and land-use constraints. It also includes the final plans for developing the Resource Management Plan. These plans will guide DOE/NV as it develops a Resource Management Plan in the coming years

  3. Implementation of the environmental management plan for the dismantling of nuclear powered submarines at Zvezdochka Shipyard, Russia

    International Nuclear Information System (INIS)

    Washer, M.; Cull, M.; Crocker, C.; Ivanov, V.; Shepurev, A.; Khan, B.U.Z.; Lee, M.; Gerchikov, M.

    2007-01-01

    Department of Foreign Affairs and International Trade Canada is funding the dismantling of twelve nuclear powered submarines (NPS) from the Russian Federation's Northern Fleet as part of the Global Partnership Initiative against weapons and materials of mass destruction. In this paper, work performed by Nuclear Safety Solutions Ltd. and its collaborators in support of these activities is described. First, an environmental impact assessment of towing and dismantling NPS in the Kola Peninsula, and the Barents and White Seas was performed. The assessed activities included: towing of NPS from Naval Bases in Murmansk Region to the Zvezdochka shipyard (Severodvinsk); defuelling of onboard reactors; dismantling of NPS at Zvezdochka; and waste management. The assessment helped identify mitigation measures that could prevent the occurrence of adverse effects. Next, the project team defined and implemented an environmental management plan (EMP) based on the shipyard's existing environmental policy and the mitigating measures identified during the environmental assessment. Specific targets were defined to track the progress of the EMP implementation, and are described in this paper. During the study period, three Victor Class NPS were dismantled at Zvezdochka. The major benefits realized include: removal and spent nuclear fuel assemblies; treatment/decontamination of liquid and solid radioactive waste; and the cultivation of collaboration between Russian and Western expertise. (author)

  4. Implementation of the environmental management plan for the dismantling of nuclear powered submarines at Zvezdochka shipyard, Russia

    International Nuclear Information System (INIS)

    Washer, M.; Cull, M.; Crocker, C.; Ivanov, V.; Shepurev, A.; Khan, B.U.Z.; Lee, M.; Gerchikov, M.

    2008-01-01

    Department of Foreign Affairs and International Trade Canada is funding the dismantling of twelve nuclear powered submarines (NPS) from the Russian Federation's Northern Fleet as part of the Global Partnership Initiative against weapons and materials of mass destruction. In this paper, work performed by Nuclear Safety Solutions Ltd. and its collaborators in support of these activities is described. First, an environmental impact assessment of towing and dismantling NPS in the Kola Peninsula, and the Barents and White Seas was performed. The assessed activities included: towing of NPS from Naval Bases in Murmansk Region to the Zvezdochka shipyard (Severodvinsk); defuelling of onboard reactors; dismantling of NPS at Zvezdochka; and waste management. The assessment helped identify mitigation measures that could prevent the occurrence of adverse effects. Next, the project team defined and implemented an environmental management plan (EMP) based on the shipyard's existing environmental policy and the mitigating measures identified during the environmental assessment. Specific targets were defined to track the progress of the EMP implementation, and are described in this paper. During the study period, three Victor Class NPS were dismantled at Zvezdochka. The major benefits realized include: removal of spent nuclear fuel assemblies; treatment/ decontamination of liquid and solid radioactive waste; and the cultivation of collaboration between Russian and Western expertise. (author)

  5. Daily time management and influence of environmental factors on use of electronic planning devices in adults with mental disability.

    Science.gov (United States)

    Janeslätt, Gunnel; Lindstedt, Helena; Adolfsson, Päivi

    2015-01-01

    To describe daily time management in adults with and without mental disability and to examine differences in the level of their daily time management; to describe the possessions and use of electronic planning devices (EPDs) in activities and how environmental factors influence the use of EPDs in adults with mental disability. In a descriptive and cross-sectional design, 32 participants using EPDs and a matched comparison group of 32 healthy adults was recruited. Time-Self rating scale measuring daily time management was adapted for adults. A study specific questionnaire was applied to collect data on five ICF environmental factors. Rasch modelling, descriptive and non-parametric statistics were applied. Time-S has acceptable psychometric properties for use on adults with mental disability. People with mental disability and low level of daily time management who use advanced EPDs are more influenced by environmental factors. The study group perceived that encouragement and support from professionals as well as services influence their use of EPDs. Time-S can safely be used for people with mental disability. EPDs do not fully compensate the needs of the target-group. Prescribers need to give considerations to this and therefore they should be provided with more knowledge about this matter. Implications for Rehabilitation The Time-S can be applied for measuring daily time management in adults. Adults with mental disability provided with EPDs are not fully compensated in daily time management. Professional support and encouragement as well as backing from the services are important factors for the use of EPDs. Because the smart phones are not prescribed as assistive technology, the need for help from professionals to facilitate daily life is stressed. Therefore, the professionals should be provided with more knowledge about the use of EPDs.

  6. The DOE Office of Environmental Management International Cooperative Program: Current Status and Plans for Expansion

    International Nuclear Information System (INIS)

    Gerdes, Kurt D.; Han, Ana M.; Marra, James C.; Fox, Kevin M.; Peeler, David K.; Smith, Michael E.; Jannik, Gerald T.; Farfan, Eduardo B.; Kim, Dong-Sang; Vienna, John D.; Roach, Jay; Aloy, A.S.; Stefanovsky, S.V.; Bondarkov, M.D.; Lopukh, D.P.; Kim, Chenwoo

    2009-01-01

    The DOE-EM Office of Engineering and Technology is responsible for implementing EM's international cooperative program. The Office of Engineering and Technology's international efforts are aimed at supporting EM's mission of risk reduction and accelerated cleanup of the environmental legacy of the nation's nuclear weapons program and government-sponsored nuclear energy research. To do this, EM pursues collaborations with government organizations, educational institutions, and private industry to identify and develop technologies that can address the site cleanup needs of DOE. Currently, DOE-EM is performing collaborative work with researchers at the Khlopin Radium Institute (KRI) and the SIA Radon Institute in Russia and the Ukraine's International Radioecology Laboratory (IRL). Additionally, a task was recently completed with the Nuclear Engineering Technology Institute (NETEC) in South Korea. The objectives of these collaborations were to explore issues relating to high-level waste and to investigate technologies that could be leveraged to support EM site cleanup needs. In FY09, continued collaboration with the current partners is planned. Additionally, new research projects are being planned to expand the International Program. A collaborative project with Russian Electrotechnical University is underway to evaluate CCIM control and monitoring technologies. A Statement of Intent was recently signed between DOE-EM and the U.K. Nuclear Decommissioning Authority (NDA) to work cooperatively on areas of mutual interest. Under this umbrella, discussions were held with NDA representatives to identify potential areas for collaboration. Information and technical exchanges were identified as near-term actions to help meet the objectives of the Statement of Intent. Technical exchanges in identified areas are being pursued in FY09.

  7. Environmental management in small and medium-sized companies: an analysis from the perspective of the theory of planned behavior.

    Science.gov (United States)

    Sánchez-Medina, Agustín J; Romero-Quintero, Leonardo; Sosa-Cabrera, Silvia

    2014-01-01

    In the business context, concern for the environment began to develop when pressure from the public administration and environmental awareness groups raised the specific requirements for companies. The Theory of Planned Behavior considers that people's conduct is determined by the intention of carrying out a certain behavior. Thus, the individual's intent is determined by three factors related to the desired outcome of the behavior: the Personal Attitude toward the Results, the Perceived Social Norms, and the Perceived Behavioral Control over the action. Therefore, the objectives of this paper are to clarify the attitudes of the managers of Canarian small and medium-sized companies about taking environmental measures, and try to demonstrate whether there is a relationship between the proposed factors and the intention to take these measures.

  8. Environmental Management in Small and Medium-Sized Companies: An Analysis from the Perspective of the Theory of Planned Behavior

    Science.gov (United States)

    Sánchez-Medina, Agustín J.; Romero-Quintero, Leonardo; Sosa-Cabrera, Silvia

    2014-01-01

    In the business context, concern for the environment began to develop when pressure from the public administration and environmental awareness groups raised the specific requirements for companies. The Theory of Planned Behavior considers that people's conduct is determined by the intention of carrying out a certain behavior. Thus, the individual's intent is determined by three factors related to the desired outcome of the behavior: the Personal Attitude toward the Results, the Perceived Social Norms, and the Perceived Behavioral Control over the action. Therefore, the objectives of this paper are to clarify the attitudes of the managers of Canarian small and medium-sized companies about taking environmental measures, and try to demonstrate whether there is a relationship between the proposed factors and the intention to take these measures. PMID:24533094

  9. Environmental Development Plan for advanced isotope separation

    International Nuclear Information System (INIS)

    1979-05-01

    This EDP identifies the planning and management requirements and schedules needed to evaluate and assess the environmental, health, and safety aspects of the Advanced Isotope Separation (AIS) program. Current AIS processes include the molecular and atomic vapor laser processes and the plasma process. This document covers the technology program, environmental concerns and requirements, and environmental strategy

  10. 77 FR 64349 - Notice of Availability of the Draft West Eugene Wetlands Resource Management Plan/Environmental...

    Science.gov (United States)

    2012-10-19

    ... planning area that lead the BLM to focus management on threatened and endangered species, including the... golden paintbrush: The scarcity of the listed species and their habitat, the importance of the planning... planning area. Because the current management approach was not developed in an RMP, there are no land use...

  11. 77 FR 22761 - Draft Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Science.gov (United States)

    2012-04-17

    ... War ironclad, USS Monitor, best known for its battle with the Confederate ironclad, CSS Virginia in... plan is comprised of eight action plans (education and outreach; research and monitoring; resource...

  12. Integrated Socio-Environmental Assessment of Deltas to Support Strategic Planning and Management

    Science.gov (United States)

    Nicholls, R. J.; Lázár, A. N.; Hutton, C.; Adams, H.; Salehin, M.; Rahman, M. M.

    2016-12-01

    Deltas are some of the most densely populated areas in the world, as exemplified by the coastal zone of Bangladesh which has a rural population densities of >1,000 people/km2. These people's livelihoods and food security are strongly dependent on natural resources which are influenced by multiple drivers. These include climate variability and change, subsidence, upstream river flow modifications, and land use changes such as polderisation and conversion of rice to shrimp production. Hydro-environmental changes, such as saline water intrusion and natural disasters (e.g. river flooding, cyclones and storm surges) have negative impacts that severely affect land use and livelihood opportunities of the coastal population. These changes can be especially detrimental for the well-being of the poorest households that are highly dependent on natural resources. These multiple drivers raise fundamental policy questions about how we might develop the delta over the coming decades. The Delta Dynamic Integrated Emulator (ΔDIEM) model has been developed to examine these interactions between the coupled bio-physical environment and the livelihoods of these poor populations in coastal Bangladesh. ΔDIEM allows the long-term analysis of the possible changes in this system by linking projected changes in physical processes (e.g. river flows, nutrients), with productivity (e.g. fish, rice), social processes (e.g. access, property rights, migration) and governance/management (e.g. fisheries, agriculture, water and land use management). A range of proposed interventions can be simulated. This integrated approach is designed to provide Bangladeshi policy makers with science-based evidence of possible development trajectories within the coastal delta plain over timescales up to 50 years, including comprehensive analysis of their different choices in terms of natural resource conservation, poverty, etc. This presentation will focus on key results and insights from the analysis.

  13. Environmental plan 2001

    International Nuclear Information System (INIS)

    2001-04-01

    With the environmental plan Eltra will describe the development of the most important environmental issues for electric contains a status for the year 2000 and a forecast to the year 2012. The total emission in year 2000 from electricity power generation and cogeneration was on 5,635 tonnes sulphur dioxide and 28,515 tonnes nitrogen oxides, which is significantly lower than earlier years. Also the CO 2 emission is reduced to 13,8 million tonnes in year 2000. The main causes are the continuous extended use of wind powr and low energy prices on accounte of large precipitation in the Nordic countries. This has influenced the power plants due to competition resulting in smaller production with fossil fuels. The year's extremely low emissions will probably be difficult to reach in the coming years. A closer analysis of the year's calculations shows that the smaller cogeneration plants for certain substances have essential by high emission pr. kWh than other power generation plants. Eltra expects in the period to year 2012 a continuous extended use of wind power, whereas extension of cogeneration plant will stagnate. The increase wind power will in the forecast period displace production from central power plants. A small increase in the electricity consumption and any export makes it still possible to continue a considerable part of the electricity production from central power plants. All in all Eltra expects a decrease in the environmental impacts from the power generation and cogeneration. (EHS)

  14. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  15. Project management plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-01-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place nineteen former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project win further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  16. Water resources management plan

    Directory of Open Access Journals (Sweden)

    Glauco Maia

    2011-12-01

    Full Text Available Water resources manageWith the mission of providing reliable data for water supply activities in medium and large firefighting operations, the Firefighting Water Supply Tactical Group (GTSAI represents an important sector of the Rio de Janeiro State Fire Departmentment plan strategic support. Acting proactively, the Tactical Group prepared a Water Resources Management Plan, aiming to set up water resources for each jurisdiction of firefighters in the City of Rio de Janeiro, in order to assist the Fire Department in its missions. This goal was reached, and in association with LAGEOP (Geoprocessing Laboratory, UFRJ, the Tactical Group started using GIS techniques. The plan provides for the register of existing operational structures within each group (troops, vehicles and special equipment, along with knowledge about the nature and operating conditions of fire hydrants, as well as a detailed survey of areas considered to be "critical". The survey helps to support actions related to environmental disasters involved in the aforementioned critical areas (hospital, churches, schools, and chemical industries, among others. The Caju neighborhood, in Rio de Janeiro, was defined as initial application area, and was the first jurisdiction to have the system implemented, followed by Copacabana, Leblon, Lagoa, and Catete districts.

  17. 76 FR 44039 - Notice of Availability of the Draft Resource Management Plan Amendment, Draft Environmental...

    Science.gov (United States)

    2011-07-22

    ... this authority would be effective only for a period of up to 2 years, without the possibility of... Snake River Conservation District, Medicine Bow Conservation District, Carbon County, and the City of... planning alternatives for the public lands administered by the BLM Rawlins Field Office within the planning...

  18. 76 FR 72718 - Notice of Availability of the Draft Baker Resource Management Plan and Environmental Impact...

    Science.gov (United States)

    2011-11-25

    ... following methods: Web site: http://www.blm.gov/or/districts/vale/plans/bakerrmp/contact.php . Email: Baker... above address or may be viewed at: http://www.blm.gov/or/districts/vale/plans/bakerrmp/index.php . FOR... will revise the existing Baker RMP of 1989 and provide the Baker Field Office with an updated framework...

  19. Mound Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Bauer, L.R.; Tullis, M.S.; Paulick, R.P.; Roush, L.L.

    1994-07-01

    The purpose of this Environmental Monitoring Plan (EMP) is to describe the environmental monitoring and surveillance programs in place at Mound. The Plan is required by DOE Order 5400.1 (DOE, 1990). The programs described in the EMP are required by the DOE 5400 Order series and by the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environment Surveillance (DOE 1991a), referred to as the Regulatory Guide throughout this Plan

  20. 77 FR 62528 - Termination of Environmental Impact Statement for the General Management Plan, Mount Rushmore...

    Science.gov (United States)

    2012-10-15

    ... the Internet at the NPS Planning, Environment, and Public Comment Web site ( http://www.parkplanning... effectiveness; rehabilitate an existing overflow parking lot as a picnic/day use area; make trail and...

  1. 77 FR 12076 - Final Programmatic Environmental Impact Statement and Integrated Water Resource Management Plan...

    Science.gov (United States)

    2012-02-28

    ... water conservation and market reallocation elements. The plan elements include projects and actions... Conservation (agricultural water and municipal/ domestic conservation); and 7. Market-Based Reallocation of Water Resources (institutional improvements to facilitate market-based water transfers). Public...

  2. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  3. 76 FR 23623 - Backcountry Management Plan, Environmental Impact Statement, Grand Canyon National Park, Arizona

    Science.gov (United States)

    2011-04-27

    ...-7945, [email protected] or Rachel Bennett, Environmental Protection Specialist, P.O. Box 129, Grand Canyon, Arizona 86023, 928-638-7326, Rachel[email protected] . SUPPLEMENTARY INFORMATION: If you wish to...

  4. Environmental Management in Product Chains

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Forman, Marianne

    2009-01-01

    between existing resources, norms and values and external pressures for environmental management (second section). A model for the types of corporate network relations that need to be mapped and understood in order to analyze and/or develop environmental management in a product chain (third section......The chapter aims at giving background to companies, consultants, governmental regulators, NGOs etc. for the analysis and planning of environmental management in specific product chains through: A framework for understanding environmental management in product chains as shaped by the interaction......). An overview of examples from our own research and from literature of the type and the role of environmental issues and initiatives in product chains (fourth section). A typology for characterizing corporate strategies as part of environmental management in product chains and characterizing those competencies...

  5. 76 FR 56220 - Draft Environmental Impact Statement for General Management Plan for Golden Gate National...

    Science.gov (United States)

    2011-09-12

    ... serve as a blueprint to guide management of these units of the National Park System over the next 15-20... Recreation Area (GGNRA) has been operating under its first GMP, approved in 1980. During the 30 years since... cultural resources. The fundamental resources of each showcased site would be managed at the highest level...

  6. Sound Waste Management Plan environmental operations, and used oil management system: Restoration project 97115. Exxon Valdez oil spill restoration project final report: Volumes 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oily wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals.

  7. Sound Waste Management Plan environmental operations, and used oil management system: Restoration project 97115. Exxon Valdez oil spill restoration project final report: Volumes 1 and 2

    International Nuclear Information System (INIS)

    1998-06-01

    This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oily wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals

  8. Conforth Ranch (Wanaket) Wildlife Mitigation Project. Draft Management Plan and Draft Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to mitigate for loss of wildlife habitat caused by the development of Columbia River Basin hydroelectric projects, including McNary dam. The proposed wildlife mitigation project involves wildlife conservation on 1140 hectares (ha)(2817 acres) of land (including water rights) in Umatilla County, Oregon. BPA has prepared an Environmental Assessment (EA)(DOE/EA- 1016) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI)

  9. 78 FR 5486 - Notice of Availability of the Draft Resource Management Plan and Draft Environmental Impact...

    Science.gov (United States)

    2013-01-25

    ... quantity and quality of the experiences and desired recreation setting available in the planning area. The... designation areas; lands with wilderness characteristics; water, soil, and riparian areas; special status... and importance values. Badger Wash, up to 2,200 acres, Alternatives A, B, C and D: No surface...

  10. 78 FR 19733 - Draft General Management Plan and Draft Environmental Impact Statement, Fort Raleigh National...

    Science.gov (United States)

    2013-04-02

    ... announce the dates, times, and locations of public meetings on the draft EIS/GMP through the NPS Planning... delivery to the above address. Electronic copies of the Draft EIS/GMP will be available online at http... through additional interpretive efforts, marketing, and facilities. Alternative C, the NPS preferred...

  11. 76 FR 55939 - Notice of Availability of the Draft Resource Management Plan and Associated Environmental Impact...

    Science.gov (United States)

    2011-09-09

    .... The planning area includes all lands, regardless of jurisdiction, totaling approximately 6.6 million acres; however, the BLM will only make decisions on lands that fall under the BLM's jurisdiction. BLM..., and motorized vehicle use limited to designated roads and trails. South Pass Historical Mining Area...

  12. 15 CFR 921.13 - Management plan and environmental impact statement development.

    Science.gov (United States)

    2010-01-01

    ... simple options) to establish adequate long-term state control; an estimate of the fair market value of... simple property interest (e.g., conservation easement), fee simple property acquisition, or a combination..., including appropriate government enforcement agencies; (9) If applicable, a restoration plan describing...

  13. Special Area Management Plan (SAMP) Upper Yellowstone River, Montana: Environmental Assessment, FONSI, and Selected Alternative

    Science.gov (United States)

    2011-04-01

    slopes must be flatter than the angle of repose for the selected revetment material. For example, rock riprap normally needs to be placed on a slope...plan that responds effectively to physical, social , and legal changes. The need for future modifications to the SAMP will be evaluated periodically

  14. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  15. Business Continuity Management Plan

    Science.gov (United States)

    2014-12-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT BUSINESS CONTINUITY MANAGEMENT PLAN December 2014......maximum 200 words) Navy Supply Systems Command (NAVSUP) lacks a business process framework for the development of Business Continuity Management

  16. 76 FR 81962 - Final Environmental Impact Statement for General Management Plan, Ross Lake National Recreation...

    Science.gov (United States)

    2011-12-29

    ... soundscapes, and scenery through traditional outdoor activities. The NPS would actively manage to reduce... Ross Lake NRA in order to protect and enhance soundscapes and wilderness character, experience, and...

  17. Wildland Fire Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Schwager, K. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-09-30

    The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

  18. Exploration of Environmental Management

    OpenAIRE

    Li Shushu; Li Ruilong; Chen Rui

    2012-01-01

    On the basis of domestic and international research, this article takes research on peasant household and agricultural managements as base points, aims to build environmental management model, establish government-led, an effective environmental management mechanism between the government and peasant household. Analyzes the role of peasant household’ environmental management in the regional environmental improvement from the aspect of theoretical analysis and analyze significant factors affec...

  19. An Environmental Audit Management Plan for the Royal Australian Air Force

    Science.gov (United States)

    1992-09-01

    the auditors and the management of this facility at the exit meeting. SA A UO D SO NA 16. Audit report was unduly concerned with trivia . SA A UO 0 SO NA...Welfare Facilities - rubbish, putrescible matter and animal wastes. 12. Swimming Pool - filter backwash. 13. Base Recycling Centre - check for any...concerned with trivia : SA A UD D SD NA 13. The audit report was useful to base management: SA A UD D SD NA 14. The audit process was effective and of

  20. 75 FR 4413 - Notice of Intent to Prepare an Environmental Impact Statement for a General Management Plan...

    Science.gov (United States)

    2010-01-27

    ... also will outline the kinds of resource management activities, visitor activities, and developments... visitor-use related issues and provide management direction for the six designated wild rivers within the... Impact Statement for a General Management Plan Amendment/Wilderness Study, for Gates of the Arctic...

  1. Fund management plan

    International Nuclear Information System (INIS)

    1984-08-01

    This revision of the Fund Management Plan updates the original plan published in May 1983. It is derived from and supplements the Mission Plan of the Office of Civilian Radioactive Waste Management. A major purpose in preparing this Plan is to inform the public about management of the Nuclear Waste Fund and the Interim Storage Fund. The purpose of the Interim Storage Fund is to finance the provision of the Federal interim storage capacity of up to 1900 metric tons of spent nuclear fuel. The Nuclear Waste Fund is a separate account for all revenues and expenditures related to the geological disposal and monitored retrieval storage of civilian radioactive waste

  2. 77 FR 37438 - Draft Trail Management Plan and Environmental Impact Statement for Cuyahoga Valley National Park...

    Science.gov (United States)

    2012-06-21

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-MWR-CUVA-10100; 6065-4000-409] Draft Trail... Park Service, Interior. ACTION: Notice of Availability. SUMMARY: The National Park Service (NPS... blueprint to guide the expansion, elimination, restoration, management, and use of the trail system and its...

  3. 77 FR 11154 - Notice of Availability for the Eastern Interior Draft Resource Management Plan/Environmental...

    Science.gov (United States)

    2012-02-24

    ... BLM will announce future meetings or hearings and any other public participation activities at least..., Attention--Eastern Interior Draft RMP/EIS, Bureau of Land Management, 1150 University Avenue, Fairbanks... interior Alaska and is divided into four geographic areas: The Fortymile, Steese, Upper Black River, and...

  4. 76 FR 57759 - Notice of Availability of Draft Resource Management Plan and Draft Environmental Impact Statement...

    Science.gov (United States)

    2011-09-16

    ... federally-owned subsurface mineral estate. The Colorado River Valley Field Office and the KFO were... Office, Colorado AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY: In... Avenue, Kremmling, Colorado 80459. Copies of the Kremmling Draft RMP/EIS are available in the KFO at the...

  5. Environmentalism and land use planning

    Energy Technology Data Exchange (ETDEWEB)

    Alonso, P A.G.

    1986-01-01

    This dissertation considers the research question: Can land-use planning attain the goals of environmentalism. The research question instigates the development of models for environmentalism and land use planning, test of their congruence, analysis of institutional means to joint them, case study of the specific method of lifestyle zoning for Nature conservation, international comparisons, and suggestions for the implementation of the ideology of environmentalism by the techniques of land-use planning. Comparison among the industrially advanced anglophone countries of Australia, Canada, Great Britain and the United States of America enable cross-cultural insight into environmentalism, land-use planning, and measures for the protection of dedicated areas. The evaluation of the fit between environmentalism and land-use planning considers their origins, values, operating principles, programs and problems. The ideological outline of contemporary environmental planning provides a framework for detailed analysis of the case study of an Environmental Living Zone on the fringe of urban Melbourne, Australia. Historical research, interpretation of planning schemes, maps and aerial photographs, interviews, and observation provided insight into the social and environmental factors in residential conservation. From the empirical and theoretical analyses, the work suggests implications for practitioners and directions for further research.

  6. Hanford Site Waste Management Plan

    International Nuclear Information System (INIS)

    1988-12-01

    The Hanford Site Waste Management Plan (HWMP) was prepared in accordance with the outline and format described in the US Department of Energy Orders. The HWMP presents the actions, schedules, and projected costs associated with the management and disposal of Hanford defense wastes, both radioactive and hazardous. The HWMP addresses the Waste Management Program. It does not include the Environmental Restoration Program, itself divided into the Environmental Restoration Remedial Action Program and the Decontamination and Decommissioning Program. The executive summary provides the basis for the plans, schedules, and costs within the scope of the Waste Management Program at Hanford. It summarizes fiscal year (FY) 1988 including the principal issues and the degree to which planned activities were accomplished. It further provides a forecast of FY 1989 including significant milestones. Section 1 provides general information for the Hanford Site including the organization and administration associated with the Waste Management Program and a description of the Site focusing on waste management operations. Section 2 and Section 3 describe radioactive and mixed waste management operations and hazardous waste management, respectively. Each section includes descriptions of the waste management systems and facilities, the characteristics of the wastes managed, and a discussion of the future direction of operations

  7. The Colorado Plateau V: research, environmental planning, and management for collaborative conservation

    Science.gov (United States)

    Villarreal, Miguel L.; van Riper, Carena J.; Johnson, Matthew J.; van Riper, Charles

    2012-01-01

    Roughly centered on the Four Corners region of the southwestern United States, the Colorado Plateau covers some 130,000 square miles of sparsely vegetated plateaus, mesas, canyons, arches, and cliffs in Arizona, Utah, Colorado, and New Mexico. With elevations ranging from 3,000 to 14,000 feet, the natural systems found within the plateau are dramatically varied, from desert to alpine conditions. This volume, the fifth from the University of Arizona Press and the tenth overall, focuses on adaptation of resource management and conservation to climate change and water scarcity, protecting biodiversity through restructured energy policies, ensuring wildlife habitat connectivity across barriers, building effective conservation networks, and exploring new opportunities for education and leadership in conservation science. An informative read for people interested in the conservation and natural history of the region, the book will also serve as a valuable reference for those people engaged in the management of cultural and biological resources of the Colorado Plateau, as well as scientists interested in methods and tools for land and resource management throughout the West.

  8. US ITER Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  9. Life Cycle Environmental Management

    DEFF Research Database (Denmark)

    Pedersen, Claus Stig; Jørgensen, Jørgen; Pedersen, Morten Als

    1996-01-01

    A precondition for environmentally conscious management is the awareness of the environmental impact potentials created by an industrial company. There is an obvious need for management tools to support the implementation of relevant environmental criteria into the industrial decision making...... processes. The discipline of life cycle environmental management (LCEM) focuses on the incorporation of environmental criteria from the life cycles of products and other company activities into the company management processes. This paper introduces the concept of LCEM as an important element...... of the complete set of environmental objects in an industrial manufacturing company....

  10. Associate Directorate Environmental Management Infrastructure Plan for Area G and Area L Domes

    International Nuclear Information System (INIS)

    Stevens, Patrice Ann; Baumer, Andrew Ronald

    2016-01-01

    Technical Area 54, at Los Alamos National Laboratory (LANL) is situated in the east-central portion of the Laboratory on the Mesita del Buey between Pajarito Canyon to the south and Canada del Buey to the north. TA-54 includes four MDAs designated as G, H, J, and L; a waste characterization, container storage, and transfer facility; active TRU waste and MLLW waste storage and low-level waste (LLW) disposal operations at Area G; active hazardous and mixed low-level (MLLW) waste storage operations at Area L; and administrative and support areas. MDA J has previously under-gone closure. Area G is a waste management and disposal area, used for the disposal and storage of radioactive wastes since 1957. Since August 2015, Area G has been in warm standby and provides minimal operations to support safety, compliance, and nitrate salt remediation. Located within Area G, MDA G covers 63-acres. MDA G contains 334 active and inactive waste management units, which include 36 pits, 294 shafts, and 4 trenches. In 1971, Area G began use for the retrievable storage of TRU waste. There are two pits, four trenches and 60 shafts that contain retrievable TRU waste. Thirty-three of the shafts contain TRU waste that may present unique problems for retrieval. In 1986, segregation of MLLW was initiated at Area G for treatment and temporary storage or for off-site disposal. Area G is the only active LLW disposal facility at the Laboratory. Current operations at Area G include storage and characterization of TRU and mixed TRU waste destined for off-site disposal at the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico and the storage of MLLW destined for off-site treatment and/or disposal. Several above-ground container storage units (CSUs) are currently used for storage of containerized MLLW and/or mixed TRU wastes. These consist of asphalt pads and associated fabric domes or other structures. As defined by the Consent Order, MDA G contains 229 of the 334 subsurface waste

  11. Associate Directorate Environmental Management Infrastructure Plan for Area G and Area L Domes

    Energy Technology Data Exchange (ETDEWEB)

    Stevens, Patrice Ann [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Baumer, Andrew Ronald [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-09-26

    Technical Area 54, at Los Alamos National Laboratory (LANL) is situated in the east-central portion of the Laboratory on the Mesita del Buey between Pajarito Canyon to the south and Cañada del Buey to the north. TA-54 includes four MDAs designated as G, H, J, and L; a waste characterization, container storage, and transfer facility; active TRU waste and MLLW waste storage and low-level waste (LLW) disposal operations at Area G; active hazardous and mixed low-level (MLLW) waste storage operations at Area L; and administrative and support areas. MDA J has previously under-gone closure. Area G is a waste management and disposal area, used for the disposal and storage of radioactive wastes since 1957. Since August 2015, Area G has been in warm standby and provides minimal operations to support safety, compliance, and nitrate salt remediation. Located within Area G, MDA G covers 63-acres. MDA G contains 334 active and inactive waste management units, which include 36 pits, 294 shafts, and 4 trenches. In 1971, Area G began use for the retrievable storage of TRU waste. There are two pits, four trenches and 60 shafts that contain retrievable TRU waste. Thirty-three of the shafts contain TRU waste that may present unique problems for retrieval. In 1986, segregation of MLLW was initiated at Area G for treatment and temporary storage or for off-site disposal. Area G is the only active LLW disposal facility at the Laboratory. Current operations at Area G include storage and characterization of TRU and mixed TRU waste destined for off-site disposal at the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico and the storage of MLLW destined for off-site treatment and/or disposal. Several above-ground container storage units (CSUs) are currently used for storage of containerized MLLW and/or mixed TRU wastes. These consist of asphalt pads and associated fabric domes or other structures. As defined by the Consent Order, MDA G contains 229 of the 334 subsurface waste

  12. 76 FR 34249 - Notice of Intent To Prepare a Resource Management Plan Amendment/Environmental Assessment for the...

    Science.gov (United States)

    2011-06-13

    ... modification. The associated management objectives dictate the level of protection, which range from... and realty, hydrology, soils, sociology, economics, and wilderness. At present, the BLM has identified... land use planning level, the process will follow the BLM's policies in the Land Use Planning Handbook...

  13. Hanford Waste Management Plan, 1987

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Hanford Waste Management Plan (HWMP) is to provide an integrated plan for the safe storage, interim management, and disposal of existing waste sites and current and future waste streams at the Hanford Site. The emphasis of this plan is, however, on the disposal of Hanford Site waste. The plans presented in the HWMP are consistent with the preferred alternative which is based on consideration of comments received from the public and agencies on the draft Hanford Defense Waste Environmental Impact Statement (HDW-EIS). Low-level waste was not included in the draft HDW-EIS whereas it is included in this plan. The preferred alternative includes disposal of double-shell tank waste, retrievably stored and newly generated TRU waste, one pre-1970 TRU solid waste site near the Columbia River and encapsulated cesium and strontium waste

  14. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    1993-01-01

    Lawrence Berkeley Laboratory's Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department's activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A

  15. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  16. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Nordstrom, Jenifer [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-02-01

    This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Non-routine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

  17. Final Environmental Assessment for Implementation of Proposed Actions in the Moody Air Force Base Integrated Natural Resources Management Plan (INRMP)

    Science.gov (United States)

    2015-09-01

    systems, wind turbines , green roofs, and habitat-oriented storm water management) would be incorporated where practicable. A-12 THIS PAGE INTENTIONALLY...requirements. There are numerous projects that would have a beneficial impact on Bird /Wildlife Aircraft Strike Hazard including prescribed burning...Force Instruction BASH Bird /Wildlife Aircraft Strike Hazard BMP best management practice CEQ Council on Environmental Quality CFR Code of

  18. Management Planning In Transport

    Directory of Open Access Journals (Sweden)

    Teodor Perić

    2004-07-01

    Full Text Available Management planning in traffic and other activities includesa choice of missions and goals, as well as actions undertakenfor their realisation. It requires decision-making, that is,a choice among alternative trends of future actions. Therefore,planning and control are closely related.There are several types of plans: purposes or missions,goals, strategies, policies, procedures, rules, programs and calculations.Once managers become aware of the opportunities, they rationallyplan the setting of the goals and assumptions about thecurrent and future environment, finding and evaluating alternativetrends, and selecting the one that is to be followed.Therefore, planning means looking ahead and controlmeans looking backwards. The concept of overall planning,thus including traffic planning, illustrates the approach to managementwhich is based on the achieved goals.

  19. Speed management program plan.

    Science.gov (United States)

    2014-05-01

    Changing public attitudes regarding speeding and speed management will require a comprehensive and concerted effort, involving a wide variety of strategies. This plan identifies six primary focus areas: : A. Data and Data-Driven Approaches, : B. Rese...

  20. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  1. Wilderness fire management planning guide

    Science.gov (United States)

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  2. 75 FR 26270 - Environmental Planning and Historic Preservation Compliance Costs Policy; Environmental Planning...

    Science.gov (United States)

    2010-05-11

    ...] Environmental Planning and Historic Preservation Compliance Costs Policy; Environmental Planning and Historic... draft Environmental Planning and Historic Preservation Compliance Costs policy and a draft Environmental Planning and Historic Preservation Mitigation policy. DATES: Comments must be received by June 10, 2010...

  3. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Vogelsang, Stefan; Freudenberg, Peggy

    2015-01-01

    This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data.......This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data....

  4. Management of Logistics Planning

    OpenAIRE

    Bjørnar Aas; Stein W. Wallace

    2010-01-01

    Logistics problems are gradually becoming more complex and a better understanding of logistics management as a subject is a key to deal with the new challenges. A core element of logistics management is logistics planning, which substitutes for low customer service levels, high waste, and the use of buffers and slacks in the execution of logistic activities. Furthermore, the availability of information and problem-solving capabilities are established as the core parts of logistics planning. B...

  5. Examination of environmentally friendly "green" logistics behavior of managers in the pharmaceutical sector using the Theory of Planned Behavior.

    Science.gov (United States)

    Arslan, Miray; Şar, Sevgi

    2017-12-11

    Logistics activities play a prominent role in enabling manufacturers, distribution channels, and pharmacies to work in harmony. Nowadays these activities have become increasingly striking in the pharmaceutical industry and seen as a development area for this sector. Additionally, green practices are beginning to be more attracting particularly in decreasing costs and increasing image of pharmaceutical companies. The main objective of this study was modeling green logistics (GL) behavior of the managers in the pharmaceutical sector in the theory of planned behavior (TPB) frame via structural equation modeling (SEM). A measurement tool was developed according to TPB. Exploratory factor analysis was conducted to determine subfactors of GL behavior. In the second step, confirmatory factor analysis (CFA) was conducted for confirming whether there is a relationship between the observed variables and their underlying latent constructs. Finally, structural equation model was conducted to specify the relationships between latent variables. In the proposed green logistics behavior (GLB) model, the positive effect of environmental attitude towards GL, perceived behavioral control related GL, and subjective norm about GL on intention towards GL were found statistically significant. Nevertheless, the effect of attitude towards costs of GL on intention towards GL was not found statistically significant. Intention towards GL has been found to have a positive statistically significant effect on the GL behavior. Based on the results of this study, it is possible to say that TPB is an appropriate theory for modeling green logistics behavior of managers. This model can be seen as a guide to the companies in the pharmaceutical sector to participate in green logistics. Copyright © 2017 Elsevier Inc. All rights reserved.

  6. Environmental Implementation Plan - EIP introduction

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1993-01-01

    Due to the commitment and participation of more than 100 professionals from site environmental coordinators, customer improvements and total quality are being incorporated into the Environmental Implementation Plan (EIP). The EIP is now a living document that communicates an overview of site environmental programs and the facility plans that are designed to protect the environment and meet changing regulatory requirements. Continuous improvement of environmental programs is enhanced through planned quarterly self-assessments during the open-quotes Reflectionsclose quotes process. Through the sharing of noteworthy practices, lessons learned, and ideas for improvement, the EIP provides a framework for environmental professionals to promote cost effective solutions and program improvements through teamwork and communication. These efforts were initiated by the Central Environmental Committee Executive Committee (CECEC) and developed and coordinated by the EIP subcommittee. The EIP revision process is the baseline for a continuous improvement cycle. Although the EIP is a Westinghouse Savannah River Company (WSRC) document, the environmental-planning process involves and will benefit all site contractors. Together, we are committed to a open-quotes Partnership in Environmental Excellence.close quotes

  7. Environmental Development Plan: uranium enrichment

    International Nuclear Information System (INIS)

    1979-09-01

    This Environmental Development Plan identifies and examines the environmental, health, safety, and socioeconomic concerns and corresponding requirements associated with the DOE research, development, demonstration, and operation of the Uranium Enrichment program, including the gaseous diffusion process, the centrifuge process, centrifuge rotor fabrication, and related research and development activities

  8. Midwest regional management plan

    International Nuclear Information System (INIS)

    Paton, R.F.

    1986-01-01

    In response to the Low-Level Radioactive Waste Policy Act of 1980, the States of Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio and Wisconsin formed the Midwest Interstate Low-Level Radioactive Waste Compact. One of the top priorities of the Compact Commission is the development of a comprehensive regional waste management plan. The plan consists of five major elements: (1) waste inventory; (2) waste stream projections; (3) analysis of waste management and disposal options; (4) development of a regional waste management system; and (5) selection of a host state(s) for future low-level waste facilities. When completed, the Midwest Management Plan will serve as the framework for future low-level radioactive waste management and disposal decisions

  9. Facility Environmental Management System

    Data.gov (United States)

    Federal Laboratory Consortium — This is the Web site of the Federal Highway Administration's (FHWA's) Turner-Fairbank Highway Research Center (TFHRC) facility Environmental Management System (EMS)....

  10. Environmental management the supply chain perspective

    CERN Document Server

    Wong, Christina W Y; Lun, Y H Venus; Cheng, T C E

    2015-01-01

    In view of the increasing quest for environmental management in businesses, this book provides a good reference to firms to understand how they may manage their supply chains to improve business and environmental performance. The book consists of six chapters covering such topics as environmental management, environmental management practices with supply chain efforts, collaborative environmental management, organizational capabilities in environmental management, environmental disclosure, and closed-loop supply chains. The book presents theory-driven discussions on the link between environmental management and business performance in the context of supply chain management. The book will be useful for firms to learn from the research findings and real-life cases to develop plans to implement environmental management practices jointly with supply chain partners.

  11. Routine Radiological Environmental Monitoring Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1999-12-31

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs.

  12. Environmental impacts of waste management in the hospitality industry: Creating a waste management plan for Bergvik Kartano

    OpenAIRE

    Adigwe, Christopher

    2014-01-01

    Many hospitality industries find it difficult to control or manage solid wastes, such as food, containers, paper, cardboard and scrap metals, which are waste generated on a daily basis depending on the industry. Most hospitality industries tend to lag behind when it comes to the collection of waste. Only a fraction of the¬¬ waste collected receives proper disposal. When waste is not collected sufficiently and the disposal is inappropriate the waste can accumulate and cause water, land and air...

  13. 78 FR 39311 - Notice of Intent To Prepare a Resource Management Plan Amendment and an Associated Environmental...

    Science.gov (United States)

    2013-07-01

    ... to analyze the plan-level decision to change the Visual Resource Management (VRM) classification of... concurrently analyze the implementation-level decision of whether to deny, approve, or approve with..., botany, lands and realty, hydrology, soils, sociology, and economics. Authority: 40 CFR 1501.7 and 43 CFR...

  14. Environmental Monitoring Plan - February 2016

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bertoldo, N. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Blake, R. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fish, C. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Grayson, A. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Griffin, D. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jones, H. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Patterson, L. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Revelli, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rosene, C. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wegrecki, T M; Williams, R A; Wilson, K R

    2016-02-08

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection oft/ic Pubile and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the hiota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements.

  15. Essays on environmental management

    OpenAIRE

    Marbuah, George

    2016-01-01

    This thesis contributes to the economic literature on invasive species, social capital connection to climate change and environmental good provision as well as energy demand management. It contains five independent papers connected by the broader theme of environmental management. Two papers (I and II) deal with invasive species while the third and fourth probes the effect of social capital on carbon dioxide emissions (CO₂) and individuals’ decision to contribute toward environmental protecti...

  16. 78 FR 25134 - Termination of the Preparation of an Air Tour Management Plan and Environmental Assessment for...

    Science.gov (United States)

    2013-04-29

    ... Forest National Park in Arizona. The FAA and NPS have stopped work on preparation of the ATMP and EA... Lusk, Program Manager, AWP-1SP, Federal Aviation Administration, Western-Pacific Region, P.O. Box 92007... developed. The FAA and NPS began preparing an EA to comply with the National Environmental Policy Act (Pub...

  17. A Study on improvement of comprehensive environmental management system - activation of liberalized environmental management

    Energy Technology Data Exchange (ETDEWEB)

    Chung, Hweu Sung; Kang, Chul Goo [Korea Environment Institute, Seoul (Korea)

    1998-12-01

    As a part of improvement on a comprehensive environmental management system, this study was attempted to find an activating policy for a liberalized environmental management. This study provided an activation plan of reasonable environmental regulation reform and liberalized environmental management through the analysis of foreign examples and domestic situation. Furthermore, it analyzed an institutional mechanism for a smooth operation of liberalized environmental management. 68 refs., 5 figs., 51 tabs.

  18. How do environmental policies fit within larger strategic planning processes

    OpenAIRE

    Crowe, Lynn

    2015-01-01

    This chapter explores how environmental policies fit within larger strategic processes relevant to sport management and development. It identifies key policy areas such as environmental impact assessment, sustainable land use planning, environmental protection and visitor impact management. Good practice and guidelines which will enable sport managers to integrate their work with these environmental policies are explored. Detailed guidance on design and longer term management and maintenance ...

  19. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  20. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Sørensen, Nils Lykke

    2016-01-01

    This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period.......This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period....

  1. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  2. Management self assessment plan

    Energy Technology Data Exchange (ETDEWEB)

    Debban, B.L.

    1998-01-30

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.

  3. Management self assessment plan

    International Nuclear Information System (INIS)

    Debban, B.L.

    1998-01-01

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations

  4. Checklist for Reviewing EPA Quality Management Plans

    Science.gov (United States)

    This checklist will be used to review the Quality Management Plans (QMPs) that are submitted to the Quality Staff of the Office of Environmental Information (OEI) for Agency review under EPA Order 5360.1 A2.

  5. Detailed oil spill contingency analysis in establishment of preparedness plans for exploration drilling in environmentally sensitive areas: an integrated management process

    Energy Technology Data Exchange (ETDEWEB)

    Spikkerud, Cathrine S.; Skeie, Geir Morten; Brude, Odd Willy; Gravir, Gjermund [DNV Managing Risk, Oslo (Norway)

    2008-07-01

    This paper describes the integrated management process leading up to a dynamic oil spill preparedness plan based on detailed analysis of oil spill contingency requirements and environmental risk in environmentally sensitive areas. Starting with a detailed environmental risk and oil spill contingency analysis, oil spill preparedness plans are developed. These plans are generic for the area possibly affected by an oil spill, and are developed in detail for environmental 'hot spots' that are highly challenging in terms of oil spill response. The detailed plans make use of detailed data sets on shoreline substrate sensitivities and cleanup methodology, photographic inventory, logistical issues and access to real-time incident data for important areas. This detailed approach ensures sufficient knowledge about the sensitive area in advance to provide fast and correct strategic and tactical operational recovery decisions. A final element of the integrated process is a web based GIS, providing all parties involved with one common situation overview, ensuring that the facts remain in focus throughout the operation and that those responsible for informing stake-holders have access to correct and timely updated information. (author)

  6. Regional energy-environmental planning

    International Nuclear Information System (INIS)

    Colavecchio, Antonio

    2007-01-01

    In consideration of the relationship existing between energy and environment, it's clear that tools are needed to reach a pre-emptive convergence of different interests coming from the management of these sectors. The main tool to realize the above-mentioned convergence of interests in the Regional Energy and Environment Plan (PEAR). The plan allows italian Regions to schedule and to address energy measures in their own area and to regulate Local entities functions [it

  7. Environmental Management Systems

    Science.gov (United States)

    This site on Environmental Management Systems (EMS) provides information and resources related to EMS for small businesses and private industry, as well as local, state and federal agencies, including all the EPA offices and laboratories.

  8. Plutonium Vulnerability Management Plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy's response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department's Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B

  9. 78 FR 7391 - Motorized Travel Management Plan, Tonto National Forest; Gila, Maricopa, Pinal, and Counties, AZ

    Science.gov (United States)

    2013-02-01

    ... point that environmental analysis for travel management under an Environmental Impact Statement (EIS... DEPARTMENT OF AGRICULTURE Forest Service Motorized Travel Management Plan, Tonto National Forest... for motorized vehicle use, thereby developing a motorized travel management plan. Such a plan is...

  10. Status of environmental technology; Interim Report to the sector study 'Petroleum and Energy', the integrated management plan for North Sea. Mapping of available environmental technology; Statusrapport for miljoeteknologi

    Energy Technology Data Exchange (ETDEWEB)

    2011-03-15

    The purpose of this report is to provide an overview of the current status of environmental technology that may help to prevent and reduce / prevent environmental pollution. The report is a foundation report to the management plan for the North Sea. The report was prepared based on the NPD's knowledge and with good input from the PSA, and resource persons in the oil companies. The following is given a summary of the various disciplines and the technological challenges the industry has managed to meet and which ones remain. (Author)

  11. Environmental Compliance Management System

    International Nuclear Information System (INIS)

    Brownson, L.W.; Krsul, T.; Peralta, R.A.; Knudson, D.A.; Rosignolo, C.L.

    1992-01-01

    Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy

  12. Environmental Management Fact Sheets.

    Science.gov (United States)

    Department of Energy, Washington, DC.

    In recent years, the need for nuclear materials has decreased and the Department of Energy (DOE) has focused greater attention on cleaning up contamination left from past activities. The Office of Environmental Management (EM) within DOE is responsible for managing waste and cleaning up contamination at DOE sites across the nation. This collection…

  13. Environmental health and health planning

    International Nuclear Information System (INIS)

    1975-07-01

    Areas of environmental concern are identified and recommendations for improving environmental health are proposed by the Environmental Health Task Force of the Western Massachusetts Health Planning Council. Environmental health concerns in Western Massachusetts are in the areas of: air pollution; dental health and the specific problem of water flouridation; housing; injury control, including accidental death and disability; land use, and the specific problem of critical receptors; noise pollution; occupational hazards, specifically occupational accidents; pesticides; radiological exposure, particularly medical X-ray exposure and nuclear exposure; rural health care; sanitation; solid waste; and water quality including private and public water supplies, road salting, and rural sewerages. Each area of concern and specific problem are broken down into sections: background information; comments which incorporate recommendations for general problem-solving activities; and resources, including lists of key organization, individuals, laws and regulations, and publications relevant to the area of concern. Recommendations are presented based on long-term and short-term environmental goals. An inventory of environmental health organizations in Western Massachusetts is included. Appendices contain the charge to the Task Force, a definition of environmental health, sources of drinking water, the sanitation and sanitary codes, and housing and sanitation standards. Portions of this document are not fully legible

  14. Environmental Development Plan: uranium mining, milling, and conversion

    International Nuclear Information System (INIS)

    1979-08-01

    This Environmental Development Plan (EDP) identifies the planning and management requirements and schedules needed to evaluate and assess the environmental, health, and safety (EH and S) aspects of the uranium mining, milling, and conversion technologies. The plan represents the collective perceptions of EH and S concerns and requirements and knowledge of ongoing research programs of most of the Federal agencies involved in significant EH and S R and D program management, standards setting, or regulatory activities associated with uranium mining, milling, and conversion

  15. Waste management plan - plant plan

    International Nuclear Information System (INIS)

    Gaudet, F.

    2008-01-01

    The author summarizes the nuclear activity of the Pierre Fabre Research Institute (sites, used radionuclides, radioprotection organisation), indicates the applied regulation, gives a brief analytical overview of the waste collection, sorting and elimination processes, of the management process for short period wastes and for long period wastes, and of the traceability and control procedures. He briefly presents some characteristics of the storing premises

  16. Environmental Management Department Quality Assurance Project Plan for Radionuclide Emission Measurements Project for compliance with National Emission Standards for Hazardous Air Pollutants (NESHAP)

    Energy Technology Data Exchange (ETDEWEB)

    Poole, D A

    1992-06-01

    This Quality Assurance Project Plan (QAPP) satisfies the quality assurance (QA) requirements in 40 CFR Part 61, Method 114, for ensuring that the radionuclide air emission measurements from the Y-12 Plant are representative; of a known precision and accuracy; and include administrative controls to ensure prompt response when emission measurements indicate an increase over normal radionuclide emissions. The QAPP ensures the quality of the Y-12 Plant radionuclide emission measurements data from the continuous samplers, breakthrough monitors, and minor radionuclide release points. The plan specifies the procedures for the management of the activities affecting the quality of the data for the Y-12 Plant Environmental Management Department (EMD) within the Health, Safety, Environment, and Accountability Division (HSEA).

  17. Environmental Management Department Quality Assurance Project Plan for Radionuclide Emission Measurements Project for compliance with National Emission Standards for Hazardous Air Pollutants (NESHAP)

    International Nuclear Information System (INIS)

    Poole, D.A.

    1992-06-01

    This Quality Assurance Project Plan (QAPP) satisfies the quality assurance (QA) requirements in 40 CFR Part 61, Method 114, for ensuring that the radionuclide air emission measurements from the Y-12 Plant are representative; of a known precision and accuracy; and include administrative controls to ensure prompt response when emission measurements indicate an increase over normal radionuclide emissions. The QAPP ensures the quality of the Y-12 Plant radionuclide emission measurements data from the continuous samplers, breakthrough monitors, and minor radionuclide release points. The plan specifies the procedures for the management of the activities affecting the quality of the data for the Y-12 Plant Environmental Management Department (EMD) within the Health, Safety, Environment, and Accountability Division (HSEA)

  18. Savannah River Site Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  19. Savannah River Site Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  20. Savannah River Site environmental implementation plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  1. Region 7 Quality Management Plan

    Science.gov (United States)

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  2. Environmental considerations in mine closure planning

    International Nuclear Information System (INIS)

    Ricks, G.

    1997-01-01

    Mine closure planning considers the best ways to plan and manage the environmental changes and socio-economic effects associated with the closing of mines. While the criteria for judging successful closures may vary, it is particularly important for physical, chemical and biological stability to be achieved and for final land use to be appropriate. Trust funds are increasingly favoured as a practical means of fulfilling the requirement for a financial surety and of ensuring that financial provision is available at the end of the mine's life. (author)

  3. Deliberate opinion of the Environmental Authority on the national plan for the management of radioactive materials and wastes (2016-2018)

    International Nuclear Information System (INIS)

    2016-01-01

    In its first part, this document presents the context of national plans for the management of radioactive materials and wastes or PNGMDR (legal general principles, modalities of elaboration, framework), the project of PNGMDR for 2016-2018, its associated procedures, and the main environmental challenges noticed by the Environmental Authority. The second part proposes an analysis of the environmental assessment and notably explains the choice of this PNGMDR in terms of objectives for the environment, and with respect to other envisaged solutions. The third part describes how the PNGMDR takes the environment into account in terms of prevention, and of transverse environmental stakes. It also proposes an analysis in terms of material type and of wastes per sector (radioactive materials, wastes of different activity levels and life, residues, wastes with high natural radioactivity, management of historical sites). Two documents published by the IRSN, respectively on the environmental assessment of the PNGMDR and on a project of storage of low level and long life wastes are provided in appendix

  4. Waste management - an integral part of environmental management systems

    Energy Technology Data Exchange (ETDEWEB)

    Hamm, Ulrich

    1998-12-01

    To consider waste as a resource instead of an annoyance with which the management has to cope with, has become an unavoidable task for modern managers. The task the management has to take to secure competitiveness in an environment of rising complexity of production processes and further increasing legal requirements, is to manage waste as much as other recourses are managed. Waste has to be considered an aspect of planning and decision process just as business plans or logistics are. Main themes discussed in this publication comprise waste management, implementation of waste management as an integral part of environmental management systems, and management approach to waste - the results. 4 figs.

  5. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  6. Environmental management system in companies

    International Nuclear Information System (INIS)

    Bonanno, C.

    1995-01-01

    The environmental management system, as the whole coordinated initiatives 'environmental oriented' introduced by companies in their organization, is discussed. Strategic weight that companies have to be present at the environmental management system is enlisted. Finally, the new professional figures of environmental technicians and environmental manager is discussed

  7. Environmental management systems

    OpenAIRE

    Misiak, Małgorzata

    2016-01-01

    Considering environmental protection requirements in business operations may, in the long run, determine if a lasting comparative advantage can be achieved. That is why our textbook, rich in case studies, identifies not only the threats a business may pose to the environment but stresses the ways of reducing its negative impact. It discusses, among other things, the concept of corporate social responsibility, environmental management systems, methods and the importance of eco-labelling goods ...

  8. Environmental management (Republic of Macedonia)

    International Nuclear Information System (INIS)

    1997-01-01

    A number of institutions are responsible for environmental monitoring, however, coordination between these agencies is poor. Also, not all parameters typically used to index pollution are measured due to lack of resources, unavailability of chemicals for analysis and obsolete equipment. The cause-effect relationship between health and pollution is not clearly known, except for a new urban areas. In order to create an efficient environmental management system, alterations of the present institutional structure are imperative. It is necessary to strengthen the Ministry of Urban Planning, Construction and Development as a short-term task to consider the need for establishing a separate Ministry of Environment in the long-term. The Ministry of Environment should be supported by an Environmental Institute, a modern inspection service and a department for staff training and international cooperation. The need to reinforce local units responsible for environmental enforcement is especially emphasized. (author)

  9. Technical management plan for sample generation, analysis, and data review for Phase 2 of the Clinch River Environmental Restoration Program

    International Nuclear Information System (INIS)

    Brandt, C.C.; Benson, S.B.; Beeler, D.A.

    1994-03-01

    The Clinch River Remedial Investigation (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. The remedial investigation is entering Phase 2, which has the following items as its objectives: define the nature and extent of the contamination in areas downstream from the DOE ORR, evaluate the human health and ecological risks posed by these contaminants, and perform preliminary identification and evaluation of potential remediation alternatives. This plan describes the requirements, responsibilities, and roles of personnel during sampling, analysis, and data review for the Clinch River Environmental Restoration Program (CR-ERP). The purpose of the plan is to formalize the process for obtaining analytical services, tracking sampling and analysis documentation, and assessing the overall quality of the CR-ERP data collection program to ensure that it will provide the necessary building blocks for the program decision-making process

  10. Environmental Restoration Program Roadmap: Strategic program plan

    International Nuclear Information System (INIS)

    1992-01-01

    This document is a strategic plan for accomplishing environmental restoration objectives at the Department of Energy's (DOE) Portsmouth Gaseous Diffusion Plant (PORTS). Waste Management (WM) for environmental restoration activities and integration of these activities into the PORTS WM operations is addressed in this document. The document provides detailed information concerning specific assumptions and activities required to meet DOE's environmental restoration objectives at this site. Environmental contamination at PORTS consists mainly of spent solvents and low level radionuclides. Solvents were used for industrial metal cleaning operations required to maintain the process during operations. Plumes of groundwater contamination resulting from past disposal of these spent solvents in landfills and impoundments extend from several locations within the site. Also, two sludge impoundments associated with a chromate reduction facility were characterized as having soil and groundwater contaminated with hexavalent chromium

  11. Implications of adopting a biodiversity-based vulnerability index versus a shoreline environmental sensitivity index on management and policy planning along coastal areas.

    Science.gov (United States)

    Harik, G; Alameddine, I; Maroun, R; Rachid, G; Bruschi, D; Astiaso Garcia, D; El-Fadel, M

    2017-02-01

    In this study, a multi-criteria index was developed to assess anthropogenic stressors along the Mediterranean coastline. The index aimed at geo-locating pollution hotspots for informed decision making related to coastal zone management. The index was integrated in a Geographical Information System based geodatabase implemented at several pilot areas along the Northern (Italy and France), Eastern (Lebanon), and Southern (Tunisia) Mediterranean coastlines. The generated stressor maps were coupled with a biodiversity richness index and an environmental sensitivity index to produce vulnerability maps that can form the basis for prioritizing management and mitigation interventions towards the identification of pollution hotspots and the promotion of sustainable coastal zone management. The results identified significant differences between the two assessment methods, which can bias prioritization in decision making and policy planning depending on stakeholders' interests. The discrepancies emphasize the need for transparency and understanding of the underlying foundations behind vulnerability indices and mapping development. Copyright © 2016 Elsevier Ltd. All rights reserved.

  12. Environmental restoration and waste management

    International Nuclear Information System (INIS)

    Middleman, L.I.

    1989-01-01

    The purpose of this Five-Year Plan is to establish an agenda for compliance and cleanup against which progress will be measured. DOE is committed to an open and participatory process for developing a national priority system for expenditure of funds. This system will be based on scientific principles and risk reduction in terms that are understandable to the public. The Plan will be revised annually, with a five-year planning horizon. For FY 1991--1995, this Plan encompasses total program activities and costs for DOE Corrective Activities, Environmental Restoration, Waste Management Operations, and Applied R ampersand D. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. It also addresses facilities and sites contaminated with or used in the management of those wastes. The Plan does not include the Safety and Health Program (Office of the Assistant Secretary for Environment, Safety, and Health) or programs of the Office of Civilian Radioactive Waste Management. It does include the annual Defense Programs contribution to the Nuclear Waste Fund for disposal of defense high-level waste and research toward characterizing the defense waste form for repository disposal

  13. Systems engineering management plan

    International Nuclear Information System (INIS)

    Conner, C.W.

    1985-10-01

    The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe the systems engineering procedures to be implemented at the Program level and the minimum requirements for systems engineering at the Program-element level. The Program level corresponds to the Director, OCRWM, or to the organizations within OCRWM to which the Director delegates responsibility for the development of the System and for coordinating and integrating the activities at the Program-element level. The Office of Policy and Outreach (OPO) and the Office of Resource Management (ORM) support the Director at the Program level. The Program-element level corresponds to the organizations within OCRWM (i.e., the Office of Geologic Repositories (OGR) and the Office of Storage and Transportation Systems (OSTS)) with overall responsibility for developing the System elements - that is, the mined geologic disposal system (MGDS), monitored retrievable storage (MRS) (if approved by Congress), and the transportation system

  14. Defense waste management plan

    International Nuclear Information System (INIS)

    1983-06-01

    Defense high-level waste (HLW) and defense transuranic (TRU) waste are in interim storage at three sites, namely: at the Savannah River Plant, in South Carolina; at the Hanford Reservation, in Washington; and at the Idaho National Engineering Laboratory, in Idaho. Defense TRU waste is also in interim storage at the Oak Ridge National Laboratory, in Tennessee; at the Los Alamos National Laboratory, in New Mexico; and at the Nevada Test Site, in Nevada. (Figure E-2). This document describes a workable approach for the permanent disposal of high-level and transuranic waste from atomic energy defense activities. The plan does not address the disposal of suspect waste which has been conservatively considered to be high-level or transuranic waste but which can be shown to be low-level waste. This material will be processed and disposed of in accordance with low-level waste practices. The primary goal of this program is to utilize or dispose of high-level and transuranic waste routinely, safely, and effectively. This goal will include the disposal of the backlog of stored defense waste. A Reference Plan for each of the sites describes the sequence of steps leading to permanent disposal. No technological breakthroughs are required to implement the reference plan. Not all final decisions concerning the activities described in this document have been made. These decisions will depend on: completion of the National Environmental Policy Act process, authorization and appropriation of funds, agreements with states as appropriate, and in some cases, the results of pilot plant experiments and operational experience. The major elements of the reference plan for permanent disposal of defense high-level and transuranic waste are summarized

  15. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    2006-01-01

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs

  16. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  17. Environmental and resource management

    DEFF Research Database (Denmark)

    Madsen, Henning; Ulhøi, John Parm

    1996-01-01

    Artiklen bringer bl.a. de seneste resultater (i forkortet udgave) fra et igangværende flerårigt forskningsprojekt - The Danish Environmental Management Survey (DEMS) - der sigter efter løbende at analysere og vurdere den igangværende 'forgrønnelse' i erhvervslivet i et longitudinalt perspektiv...

  18. Hanford Site environmental management specification

    International Nuclear Information System (INIS)

    Grygiel, M.L.

    1998-01-01

    The US Department of Energy, Richland Operations Office (RL) uses this Hanford Site Environmental Management Specification (Specification) to document top-level mission requirements and planning assumptions for the prime contractors involved in Hanford Site cleanup and infrastructure activities under the responsibility of the US Department of Energy, Office of Environmental Management. This Specification describes at a top level the activities, facilities, and infrastructure necessary to accomplish the cleanup of the Hanford Site and assigns this scope to Site contractors and their respective projects. This Specification also references the key National Environmental Policy Act of 1969 (NEPA), Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and safety documentation necessary to accurately describe the cleanup at a summary level. The information contained in this document reflects RL's application of values, priorities, and critical success factors expressed by those involved with and affected by the Hanford Site project. The prime contractors and their projects develop complete baselines and work plans to implement this Specification. These lower-level documents and the data that support them, together with this Specification, represent the full set of requirements applicable to the contractors and their projects. Figure 1-1 shows the relationship of this Specification to the other basic Site documents. Similarly, the documents, orders, and laws referenced in this specification represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents

  19. Hanford Site environmental management specification

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L.

    1998-06-10

    The US Department of Energy, Richland Operations Office (RL) uses this Hanford Site Environmental Management Specification (Specification) to document top-level mission requirements and planning assumptions for the prime contractors involved in Hanford Site cleanup and infrastructure activities under the responsibility of the US Department of Energy, Office of Environmental Management. This Specification describes at a top level the activities, facilities, and infrastructure necessary to accomplish the cleanup of the Hanford Site and assigns this scope to Site contractors and their respective projects. This Specification also references the key National Environmental Policy Act of 1969 (NEPA), Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and safety documentation necessary to accurately describe the cleanup at a summary level. The information contained in this document reflects RL`s application of values, priorities, and critical success factors expressed by those involved with and affected by the Hanford Site project. The prime contractors and their projects develop complete baselines and work plans to implement this Specification. These lower-level documents and the data that support them, together with this Specification, represent the full set of requirements applicable to the contractors and their projects. Figure 1-1 shows the relationship of this Specification to the other basic Site documents. Similarly, the documents, orders, and laws referenced in this specification represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents.

  20. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  1. Study on radioactive material management plan and environmental analysis of water (I) study of radioactive substance in water management and analyse to eat of the US environmental protection agency (environmental protection agency)

    Energy Technology Data Exchange (ETDEWEB)

    Her, Jae; Min, Hye Lim; Han, Seong Gyu; Lim, Hyun Jong; Jo, Han Byeol; Noh, Young Hoon; Lee, Ho Sun [Dept. of Bio-convergence Engineering, Graduate School of Korea University, Seoul (Korea, Republic of); Kim, Jung Min [Dept. of Radiological Science, Korea University, Seoul (Korea, Republic of); Park, Min Suk [Korea Institute of Radiological and Medical Sciences, Seoul (Korea, Republic of)

    2015-06-15

    The interest of the people in the radioactive contamination of the water has increased significantly and the study about analysis and management of radioactive materials are being actively conducted. And monitoring spots have been expanded to the range of public water as well as drinking water by publishing the rule of drinking water quality standards and examination in the Environmental Enforcement Ordinance No. 553 of Korea. In this study, US EPA was investigated as the foreign advanced cases and the way that is appropriate for the Korea was sought by analyzing investigate radionuclide, interval and management. As a result, in the selection part of investigate radionuclide, geological survey, status of nuclear power plants and the presence of the use of artificial radionuclides of the Korea should be investigated and additionally after the selection of a few radionuclides, the systems should be extended to cover all possible radionuclides by considering radioactive pollution levels in humans may be exposed due to the annual drinking water. In the part of the investigate interval, the concept(MCL, DL) should be set up for preventing concentration detection of above MCL and it needs to the maintenance and management. For example, when the concentration is more than MCL, it should be investigated on a quarterly and when the concentration is lower than MCL, it should be investigated to each different interval and management. And the US EPA divided the management area and make the road map for managing drinking water. The each classified area has been organized to match the state budget and labor force and the individual data have been managed effectively by HPGe, the NaI, TLD and so on.

  2. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    Energy Technology Data Exchange (ETDEWEB)

    Naidu, J.R.; Paquette, D.; Lee, R. [and others

    1996-10-01

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities.

  3. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    International Nuclear Information System (INIS)

    Naidu, J.R.; Paquette, D.; Lee, R.

    1996-01-01

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities

  4. Environmental protection and management guidebook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-11-15

    In British Columbia, oil and gas activities on private or Crown land are subject to regulations in terms of environmental practices. This environmental protection and management guidebook seeks to provide information on the Oil and Gas Activities Act. All sections from the regulation: water, riparian values, wildlife and wildlife habitat, conserving soil, forest health, invasive plants, natural range barriers, seismic lines, areas to be restored and old growth management areas, resource features and cultural heritage resources, are covered in this document. The minimum acceptable operational standards and practices for oil and gas activities in British Columbia are described. This guide is intended to provide clients and stakeholders with recommendations concerning the planning phase, before any permits are applied for, and concerning permissions or authorizations generally for oil and gas activities in British Columbia.

  5. Environmental Monitoring Plan, Sandia National Laboratories, Livermore

    International Nuclear Information System (INIS)

    Holland, R.C.

    1992-06-01

    This Environmental Monitoring Plan was written to fulfill the requirements of DOE Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories, Livermore. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 61 refs

  6. Planning and Resource Allocation Management.

    Science.gov (United States)

    Coleman, Jack W.

    1986-01-01

    Modern scientific management techniques provide college administrators with valuable planning and resource allocation insights and enhances the decision process. The planning model should incorporate assessment, strategic planning, dynamic and long-term budgeting, operational planning, and feedback and control for actual operations. (MSE)

  7. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  8. Application of remote sensing to environmental management

    Energy Technology Data Exchange (ETDEWEB)

    Handley, J F

    1980-01-01

    The contribution of remote sensing to environmental management procedures at the sub-regional scale is examined in relation to the County Structure environmental management plan for Merseyside County, England. The various seasons, scales and emulsions used for aerial photography in the county are indicated, and results of aerial surveys of the distribution of derelict and despoiled land and of natural environments are presented and compared with ground surveys. The use of color infrared and panchromatic aerial photographs indicating areas of environmental stress and land use in the formulation, implementation and monitoring of environmental management activities is then discussed.

  9. Configuration Management Plan for K Basins

    International Nuclear Information System (INIS)

    Weir, W.R.; Laney, T.

    1995-01-01

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Programclose quotes

  10. Environmental management activities

    International Nuclear Information System (INIS)

    1997-01-01

    The Office of Environmental Management (EM) has been delegated the responsibility for the Department of Energy's (DOE's) cleanup of the nuclear weapons complex. The nature and magnitude of the waste management and environmental remediation problem requires the identification of technologies and scientific expertise from domestic and foreign sources. Within the United States, operational DOE facilities, as well as the decontamination and decommissioning of inactive facilities, have produced significant amounts of radioactive, hazardous, and mixed wastes. In order to ensure worker safety and the protection of the public, DOE must: (1) assess, remediate, and monitor sites and facilities; (2) store, treat, and dispose of wastes from past and current operations; and (3) develop and implement innovative technologies for environmental restoration and waste management. The EM directive necessitates looking beyond domestic capabilities to technological solutions found outside US borders. Following the collapse of the Soviet regime, formerly restricted elite Soviet scientific expertise became available to the West. EM has established a cooperative technology development program with Russian scientific institutes that meets domestic cleanup objectives by: (1) identifying and accessing Russian EM-related technologies, thereby leveraging investments and providing cost-savings; (2) improving access to technical information, scientific expertise, and technologies applicable to EM needs; and (3) increasing US private sector opportunities in Russian in EM-related areas

  11. Environmental performance management

    International Nuclear Information System (INIS)

    Kwant, J.W.H.; Grant, R.O.H.

    1991-01-01

    This paper describes the environmental programme developed by Shell U.K. Exploration and Production (EXPRO) aiming at a continuous improvement of its environmental performance. The company operates a total of 33 platforms in the North Sea and has 3 land based gas treatment plants. This paper, therefore, relates mainly to the offshore environment. The programme is driven by adopting a goal setting policy. The plan was initiated mid 1990 when an inventory was made of all gaseous emissions, liquid effluents and solid waste discharges of EXPRO's operations during 1989. This baseline was used to identify the largest waste steams and to set priorities for the subsequent improvement programme. Areas for improvement are: atmospheric emissions from venting, flaring and the use of Freons and Halons, the use of Oil Based Mud (OBM), produced water and the disposal of industrial waste. The programme has gained momentum and targets have been set

  12. Environmental Land Management in Tajikistan

    Science.gov (United States)

    Makhmudov, Zafar; Ergashev, Murod

    2015-04-01

    Tackling Environmental Land Management in Tajikistan "Project approach" Khayrullo Ibodzoda, Zafar Mahmoudov, Murod Ergashev, Kamoliddin Abdulloev Among 28 countries in Europe and Central Asia, Tajikistan is estimated to be the most vulnerable to the climate change impacts depending on its high exposure and sensitivity combined with a very low adaptive capacity. The agricultural sector of Tajikistan is subject to lower and more erratic rainfalls, as well as dryness of water resources due to the possible temperature rising in the region, high evaporation, reducing the accumulation of snow in the mountain glaciers and increased frequency of extreme events. Climate change and variability are likely to pose certain risks, especially for those who prefer natural agriculture or pasture management that just reinforces the need for sound, adapted to new climatic conditions and improved principles of land management. Adoption of new strategies and best practices on sustainable land and water management for agricultural ecosystems will help the farmers and communities in addressing the abovementioned problems, adapt and become more resilient to changing climate by increasing wellbeing of local population, and contributing to food security and restoring productive natural resources. The Environmental Land Management and Rural Livelihoods Project is being financed by the Pilot Program for Climate Resilience (PPCR) and Global Environment Facility (GEF). The Project goal is to enable the rural population to increase their productive assets by improving management of natural resources and building resilience to climate change in selected climate vulnerable sites. The project will facilitate introduction of innovative measures on land use and agricultural production by providing small grants at the village level and grants for the Pasture User Groups (PUGs) at jamoat level in order to implement joint plans of pasture management and wellbred livestock, also for the Water User

  13. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  14. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  15. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    resources and to reduce the costs of communication. Planning and scheduling is generally a heavy consumer of time, memory and energy resources. This means careful thought must be given to how much planning and scheduling should be done on the sensors themselves, and how much to do elsewhere. The difficulty of planning and scheduling is exacerbated when reasoning about uncertainty. More time, memory and energy is needed to solve such problems, leading either to more expensive sensors, or suboptimal plans. For example, scientifically interesting events may happen at random times, making it difficult to ensure that sufficient resources are availanble. Since uncertainty is usually lowest in proximity to the sensors themselves, this argues for planning and scheduling onboard the sensors. However, cost minimization dictates sensors be kept as simple as possible, reducing the amount of planning and scheduling they can do themselves. Furthermore, coordinating each sensor's independent plans can be difficult. In the full presentation, we will critically review the planning and scheduling systems used by previously fielded sensor networks. We do so primarily from the perspective of the computational sciences, with a focus on taming computational complexity when operating sensor networks. The case studies are derived from sensor networks based on UAVs, satellites, and planetary rovers. Planning and scheduling considerations include multi-sensor coordination, optimizing science value, onboard power management, onboard memory, planning movement actions to acquire data, and managing communications.These case studies offer lessons for future designs of environmental sensor networks.

  16. Hanford Site Environmental Management Specification

    International Nuclear Information System (INIS)

    DAILY, J.L.

    2001-01-01

    The US Department of Energy, Richland Operations Office (RL) has established a document hierarchy as part of its integrated management system. The Strategic Plan defines the vision, values, missions, strategic goals, high-level outcomes, and the basic strategies in achieving those outcomes. As shown in Figure 1-1, the Site Specification derives requirements from the Strategic Plan and documents the top-level mission technical requirements for the work involved in the RL Hanford Site cleanup and infrastructure activities under the responsibility of the U.S. Department of Energy, Office of Environmental Management (EM). It also provides the basis for all contract technical requirements. Since this is limited to the EM work, neither the Fast Flux Test Facility (FFTF) nor the Pacific Northwest National Laboratory (PNNL) non-EM science activities are included. Figure 1-1 also shows the relationship between this Site Specification and the other Site management and planning documents. Similarly, the documents, orders, and laws referenced in this document represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents

  17. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed...... over a range of years, institutional set-up and procedures have been adapted to these. The Water Framework Directive imposes a specific ecosystem oriented management approach, which directs planning to the fulfilment of objectives linked to specific water bodies, and an emphasis on the involvement...... of stakeholders and citizens. Institutional scholars point out that such an eco-system based approach superimposed on an existing institutional set-up for spatial planning and environmental management may create implementation problems due to institutional misfit (Moss 2004). A need for adaptation of procedures...

  18. 77 FR 30315 - Notice of Intent To Amend the 1985 Michigan Resource Management Plan and Associated Environmental...

    Science.gov (United States)

    2012-05-22

    ... may submit comments on issues and planning criteria related to the 1985 Michigan RMP Amendment by any... the deaf (TDD) may call the Federal Information Relay Service (FIRS) at 1- 800-877-8339 to contact the... Michigan RMP, announces the beginning of the scoping process, and seeks public input on issues and planning...

  19. Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Westinghouse Electric Company Waste Isolation Division

    1999-01-01

    the requirements of this program plan, are also referenced. The DOE regulates its own activities for radiation protection of the public under the authority of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2011). The effluent and environmental monitoring activities prescribed by DOE Order 5400.5 and the DOE/EH-0173T guidance manual are designed to ensure that DOE facilities implement standards and regulations to protect members of the public and the environment against undue risk from radiation. Effluent and environmental monitoring also provide 1999 Environmental Monitoring Plan DOE/WIPP 99-2194 the data necessary to demonstrate compliance with applicable environmental protection regulations. Other federal agencies, such as the U.S. Environmental Protection Agency (EPA), are empowered through specific legislation to regulate certain aspects of DOE activities potentially affecting public health and safety or the environment. Presidential Executive Order 12088, Federal Compliance with Pollution Control Standards (43 FR 47707), requires the heads of executive agencies to ensure that all federal facilities and activities comply with applicable pollution control standards and to take all necessary actions for the prevention, control, and abatement of environmental pollution. Beyond statutory requirements, the DOE has established a general environmental protection policy. The Environmental Policy Statement (issued by then Secretary Herrington on January 8, 1986, and extended on January 7, 1987) describes the DOE's commitment to national environmental protection goals in that it conducts operations ''in an environmentally safe and sound manner . . . in compliance with the letter and spirit of applicable environmental statutes, regulations, and standards'' (DOE, 1986). This Environmental Policy Statement also states the DOE's commitment to ''good environmental management in all of its programs and at all of its facilities in order to correct existing environmental

  20. Proceedings of the 18. international symposium on mine planning and equipment selection (MPES 2009) and the 11. international symposium on environmental issues and waste management in energy and mineral production (SWEMP 2009) : mine planning and equipment selection and environmental issues and waste management in energy and mineral production

    International Nuclear Information System (INIS)

    Singhal, R.K.; Mehrotra, A.; Fytas, K.; Ge, H.

    2009-01-01

    This conference focused on the application of innovative technologies to the mineral industries and the development of productive methods for the mining and processing industries. It was attended by participants from North and South America, Europe, Australia, Africa and Asia with backgrounds in computer sciences, mining engineering and research in mineral production. The major topics addressed regarding mine planning and equipment selection included economic and technical feasibility studies; reserve estimation; mine development; design and planning of surface and underground mines; drilling, blasting, tunneling and excavation engineering; mining equipment selection; automation and information technology; maintenance and production management for mines and mining systems; mining in terms of health, safety and the environment; and rock mechanics and geotechnical applications. The topics addressed regarding waste management in energy and mineral production included the environmental impacts of coal-fired power projects; mining and reclamation; water management; social aspects of rehabilitation; sustainable development for mineral and energy industries; remediation of contaminated soil and groundwater; health hazard and safety issues in small-scale mining; environmental issues in surface and underground mining of metalliferous, coal, uranium and industrial minerals; occupational health and safety; control of effluents from mineral processing, metallurgy and chemical plants; emerging technologies for environmental protection; reliability of waste containment structures; and tailings treatment, recycling and disposal. The conference featured 162 presentations, of which 30 have been catalogued separately for inclusion in this database. refs., tabs., figs.

  1. Fund management plan

    International Nuclear Information System (INIS)

    1983-05-01

    The Nuclear Waste Policy Act of 1982, P.L. 97-425 (the Act), provides for establishment of two separate special funds in the US Treasury, the Interim Storage Fund and the Nuclear Waste Fund (the Funds). The Interim Storage Fund (Sec. 136) is the financing mechanism for the provision of federal interim storage capacity, not to exceed 1900 metric tons, for spent nuclear fuel (SNF) from civilian reactors. Basically, interim storage of SNF is the responsibility of the owners and generators of nuclear wastes. Storage at government facilities will be provided only if the utilities do not have adequate storage capacity. The Nuclear Waste Fund (Sec. 302) is the statutory financing approach for the Department's radioactive waste disposal program. P.L. 97-425 directs utilities to pay a mandatory fee to cover DOE's expected costs for nuclear waste disposal. The Funds are administered by the Department of Energy. This Plan identifies how DOE will implement and manage the Nuclear Waste and Interim Storage Funds

  2. Environmental monitoring plan - environmental monitoring section. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Wilt, G.C. [ed.; Tate, P.J.; Brigdon, S.L. [and others

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures.

  3. Environmental monitoring plan - environmental monitoring section. Revision 1

    International Nuclear Information System (INIS)

    Wilt, G.C.; Tate, P.J.; Brigdon, S.L.

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures

  4. Near-Facility Environmental Monitoring Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    2000-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards

  5. Environmental management report 2011

    International Nuclear Information System (INIS)

    Braathen, Ole-Anders

    2012-01-01

    One of NILU's main goals is to study the impact of pollution. It is thus very important for the institute to have control of the impact the institute's own activities may have on the environment and to reduce the impact as far as possible. NILU has for many years been working to reduce the impact. In order to take this one step further, it was decided that the institute should restructure the work according to a relevant environmental standard and to seek certification according to the same standard. The chosen standard is ISO 14001:2004 (Environmental management systems: Requirements with guidance for use) and NILU achieved certification according to this standard in October 2010.(Author)

  6. Environmental management report 2011

    Energy Technology Data Exchange (ETDEWEB)

    Braathen, Ole-Anders

    2012-07-01

    One of NILU's main goals is to study the impact of pollution. It is thus very important for the institute to have control of the impact the institute's own activities may have on the environment and to reduce the impact as far as possible. NILU has for many years been working to reduce the impact. In order to take this one step further, it was decided that the institute should restructure the work according to a relevant environmental standard and to seek certification according to the same standard. The chosen standard is ISO 14001:2004 (Environmental management systems: Requirements with guidance for use) and NILU achieved certification according to this standard in October 2010.(Author)

  7. Environmental management report 2010

    International Nuclear Information System (INIS)

    Braathen, Ole-Anders

    2011-01-01

    One of NILU's main goals is to study the impact of pollution. It is thus very important for the institute to have control of the impact the institute's own activities may have on the environment and to reduce the impact as far as possible. NILU has for many years been working to reduce the impact. In order to take this one step further, it was decided that the institute should restructure the work according to a relevant environmental standard and to seek certification according to the same standard. The chosen standard is ISO 14001:2004 (Environmental management systems: Requirements with guidance for use) and NILU achieved certification according to this standard in October 2010.(Author)

  8. Environmental management report 2010

    Energy Technology Data Exchange (ETDEWEB)

    Braathen, Ole-Anders

    2011-07-01

    One of NILU's main goals is to study the impact of pollution. It is thus very important for the institute to have control of the impact the institute's own activities may have on the environment and to reduce the impact as far as possible. NILU has for many years been working to reduce the impact. In order to take this one step further, it was decided that the institute should restructure the work according to a relevant environmental standard and to seek certification according to the same standard. The chosen standard is ISO 14001:2004 (Environmental management systems: Requirements with guidance for use) and NILU achieved certification according to this standard in October 2010.(Author)

  9. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  10. 78 FR 25762 - Notice of Availability of the Final Trail Management Plan/Final Environmental Impact Statement...

    Science.gov (United States)

    2013-05-02

    ... Vaughn Road, Brecksville, Ohio 44141. The document is also available on the internet at the NPS Planning... paddling and parking areas, and guidance for the restoration and sustainability of the trail system for the...

  11. 78 FR 24232 - Record of Decision for the Denali Park Road Final Vehicle Management Plan and Environmental...

    Science.gov (United States)

    2013-04-24

    ... discuss the draft plan at their regular meetings. Park staff attended and presented at approximately six... pieces of correspondence were received, containing 889 comments, during the 90- day comment period. A...

  12. ENVIRONMENTAL MANAGEMENT SYSTEMS CERTIFICATION

    Directory of Open Access Journals (Sweden)

    Aniko Miler-Virc

    2012-12-01

    Full Text Available ISO 14001 prescribes the requirements for a system, not environmental performance itself. Similarly, certification is of the management system itself, not environmental performance. An audit is not conducted to ascertain whether your flue gas emissions are less than X part per million nitrous oxide or that your wastewater effluent contains less that Y milligrams of bacteria per litre. Consequently, the procces of auditing the system for compliance to the standard entails checking to see that all of the necessary components of a functioning system are present and working properly.           A company can have a complete and fully functional EMS as prescribed by ISO 14001 without being certified. As certification can add to the time and expense of EMS development, it is important for you to establish, in advance, whether certification is of net benefit to you. Although most companies that develop an EMS do in fact certify, there are cases where certification does not add immediate value. Certification is not always beneficial to small and medium sized companies. Certification is not always necessary for companies with one or two large clients with environmental demands who are satisfied that you have a functional EMS (second-party declaration. Whatever decision you make, it is important to remember that just as a driver′s licence does not automatically make you a good driver, ISO 14001 certification does not automatically make your company environmentally benign or ensure that you will continually improve environmental performance. The system is only as good as the people who operate it.

  13. Environmental Regulatory Compliance Plan for Site Characterization

    International Nuclear Information System (INIS)

    1988-12-01

    The DOE is committed to conduct its operations in an environmentally safe and sound manner, and will comply with applicable environmental statutes and regulations. These objectives are described in DOE Order 5400.1 (Environmental Protection Program Requirements). This document -- the Environmental Regulatory Compliance Plan (ERCP) -- is one method of implementing the policy set forth in DOE Order 5400.1 and the NWPA. The ERCP describes the plan by which the DOE will comply with applicable Federal environmental statutes and regulations. The ERCP also discusses how DOE will address State and local environmental statutes and regulations. 180 refs., 27 figs., 1 tab

  14. Managing Complex Environmental Risks

    Energy Technology Data Exchange (ETDEWEB)

    Karlsson, Mikael [Karlstad Univ. (Sweden). Dept. of Environmental Sciences

    2006-09-15

    Environmental and public health risks are often handled in a process in which experts, and sometimes policy makers, try their best to quantitatively assess, evaluate and manage risks. This approach harmonises with mainstream interpretations of sustainable development, which aim at defining a desirable relationship between human and natural systems, for instance by policies that define limit values of different forms of disturbances. However, under conditions of high scientific incertitude, diverging values and distrust, this approach is far from satisfactory. The use of cell phones, hazardous chemicals, nuclear or fossil energy systems, and modern biotechnology are examples of activities causing such risks with high complexity. Against this background, a complementary interpretation of the concept of sustainable development is suggested. This interpretation is operationalised through new formulations of three common principles for public risk management; the precautionary principle, the polluter pays principle and the principle of public participation. Implementation of these reformulated principles would challenge some foundations of present mainstream views on environmental decision-making, but would on the other hand contribute to improved practices for long-term human welfare and planetary survival (full text of contribution)

  15. Managing Complex Environmental Risks

    International Nuclear Information System (INIS)

    Karlsson, Mikael

    2006-01-01

    Environmental and public health risks are often handled in a process in which experts, and sometimes policy makers, try their best to quantitatively assess, evaluate and manage risks. This approach harmonises with mainstream interpretations of sustainable development, which aim at defining a desirable relationship between human and natural systems, for instance by policies that define limit values of different forms of disturbances. However, under conditions of high scientific incertitude, diverging values and distrust, this approach is far from satisfactory. The use of cell phones, hazardous chemicals, nuclear or fossil energy systems, and modern biotechnology are examples of activities causing such risks with high complexity. Against this background, a complementary interpretation of the concept of sustainable development is suggested. This interpretation is operationalised through new formulations of three common principles for public risk management; the precautionary principle, the polluter pays principle and the principle of public participation. Implementation of these reformulated principles would challenge some foundations of present mainstream views on environmental decision-making, but would on the other hand contribute to improved practices for long-term human welfare and planetary survival (full text of contribution)

  16. Uranium Mill Tailings Remedial Action Project Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Department of Energy (DOE) has issued requirements for complying with DOLE and other Federal agency environmental regulations. DOE Order 5400.1 requires environmental monitoring plans for each DOE operation that uses, generates, releases, or manages pollutants of radioactive and hazardous materials

  17. Fuels planning: science synthesis and integration; environmental consequences fact sheet 08: Evaluating sedimentation risks associated with fuel management

    Science.gov (United States)

    William Elliot; Pete Robichaud

    2005-01-01

    This fact sheet describes the sources of sediment in upland forest watersheds in the context of fuel management activities. It presents the dominant forest soil erosion processes, and the principles behind the new sediment delivery interface developed to aid in erosion analysis of fuel management projects.

  18. Interim Hanford Waste Management Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The September 1985 Interim Hanford Waste Management Plan (HWMP) is the third revision of this document. In the future, the HWMP will be updated on an annual basis or as major changes in disposal planning at Hanford Site require. The most significant changes in the program since the last release of this document in December 1984 include: (1) Based on studies done in support of the Hanford Defense Waste Environmental Impact Statement (HDW-EIS), the size of the protective barriers covering contaminated soil sites, solid waste burial sites, and single-shell tanks has been increased to provide a barrier that extends 30 m beyond the waste zone. (2) As a result of extensive laboratory development and plant testing, removal of transuranic (TRU) elements from PUREX cladding removal waste (CRW) has been initiated in PUREX. (3) The level of capital support in years beyond those for which specific budget projections have been prepared (i.e., fiscal year 1992 and later) has been increased to maintain Hanford Site capability to support potential future missions, such as the extension of N Reactor/PUREX operations. The costs for disposal of Hanford Site defense wastes are identified in four major areas in the HWMP: waste storage and surveillance, technology development, disposal operations, and capital expenditures

  19. Environmental management in public hospitals: Environmental management in Colombia

    Directory of Open Access Journals (Sweden)

    Juan Pablo Rodríguez-Miranda

    2016-10-01

    Conclusions: Hospitals can apply broader environmental management instruments, including life cycle analysis of their products and services and monitoring of the carbon footprint; they may also take into account the different areas of environmental impact of their operation.

  20. Environmental Management Performance Report

    International Nuclear Information System (INIS)

    EDER, D.M.

    2002-01-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (RL) a monthly summary of the Central Plateau Contractor's Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. Only current FH workscope responsibilities are described and other contractor/RL managed work is excluded. Please refer to other sections (BHI, PNNL) for other contractor information. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the contractor baseline. The remaining sections provide detailed performance data relative to each individual subproject (e.g., Plutonium Finishing Plant, Spent Nuclear Fuels, etc.), in support of Section A of the report. All information is updated as of January 31, 2002 unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular safety area. Green boxes denote either (1) the data are stable at a level representing ''acceptable'' performance, or (2) an improving trend exists. Yellows denote the data are stable at a level from which improvement is needed. Red denotes a trend exists in a non-improving direction

  1. Environmental Management Performance Report

    International Nuclear Information System (INIS)

    EDER, D.M.

    2002-01-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (RL) a monthly summary of the Central Plateau Contractor's Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. Only current FH workscope responsibilities are described and other contractor/RL managed work is excluded. Please refer to other sections (BHI, PNNL) for other contractor information. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the contractor baseline. The remaining sections provide detailed performance data relative to each individual subproject (e.g., Plutonium Finishing Plant, Spent Nuclear Fuels, etc.), in support of Section A of the report. All information is updated as of the end of May 2002 unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular safety area. Green boxes denote either (1) the data are stable at a level representing ''acceptable'' performance, or (2) an improving trend exists. Yellows denote the data are stable at a level from which improvement is needed. Red denotes a trend exists in a non-improving direction

  2. 75 FR 55602 - Notice of Intent To Prepare an Environmental Assessment To Amend the Resource Management Plan for...

    Science.gov (United States)

    2010-09-13

    ... advance, through local media, newspaper, and the BLM Web site at: http://www.blm.gov/co/st/en/fo/slvplc..., Colorado 81144; e-mail [email protected] . SUPPLEMENTARY INFORMATION: The Programmatic Environmental... oversight. The ROD for the Programmatic EIS can be found at the following Web site: http://www.blm.gov/wo/st...

  3. 78 FR 16528 - Notice of Intent To Prepare a Cultural Resources Management Plan/Environmental Impact Statement...

    Science.gov (United States)

    2013-03-15

    ....C. 1131-36) and other laws and policies, will frame the decision-making for the CRMP/EIS. The CRMP...-action and a preferred alternative. The potential environmental effects of each alternative will be... decisions related to this project are invited to participate in the scoping process and, if eligible, may...

  4. 76 FR 53484 - Notice of Availability of the Draft Resource Management Plan/Draft Environmental Impact Statement...

    Science.gov (United States)

    2011-08-26

    ... was designated. Scoping issues identified include wilderness characteristics, livestock grazing, recreational target and sports shooting, travel management, and energy development. Five alternatives are... 15 to July 15, or as determined by the Sonoran Pronghorn Recovery Team). Minor land-use...

  5. 75 FR 19422 - Availability of a Final Environmental Impact Statement for the General Management Plan (FEIS/GMP...

    Science.gov (United States)

    2010-04-14

    .... Alternative A is the No-Action Alternative, which would continue current management practices and trends, with no major changes in direction. Alternative B emphasizes the natural environment by keeping the site...

  6. Development of the environmental data management system

    International Nuclear Information System (INIS)

    Tatebe, Kazuaki; Suzuki, Yurina; Shirato, Seiichi; Sato, Yoshinori

    2012-02-01

    The recent society requires business activities with environmental consideration to every enterprise. Also, Japanese laws require those activities. For example, 'Law Concerning the Promotion of Business Activities with Environmental Consideration by Specified Corporations, etc, by Facilitating Access to Environmental Information, and Other Measures' (Environmental Consideration Law) mandates publication of a report relating to the activities of environmental consideration to each enterprise above designated size. 'Act on the Rational Use of Energy' mandates the report of the results of energy consumption and the long-term plan of the rational use of energy. Moreover, 'Act on Promotion of Global Warming Countermeasures' mandates the report of the greenhouse gas emissions. In addition to those, 'Water Pollution Control Law', 'Waste Management and Public Cleaning Law' and other environmental laws as well as environmental ordinances require business activities with environmental consideration to all companies. So, it is very important for Japan Atomic Energy Agency (JAEA) to report business activities with environmental consideration in order to build up trustful relations with the nation and communities. The Environmental Data Management System has been developed as the data base of business activities with environmental consideration in JAEA and as the means to promote the activities at every site and office of JAEA. This report summarizes the structure of the Environmental Data Management System, kinds of environmental performance data treated by the system, and gathering methods of the data. (author)

  7. Environmental Management vitrification activities

    Energy Technology Data Exchange (ETDEWEB)

    Krumrine, P.H. [Waste Policy Institute, Gaithersburg, MD (United States)

    1996-05-01

    Both the Mixed Waste and Landfill Stabilization Focus Areas as part of the Office of Technology Development efforts within the Department of Energy`s (DOE) Environmental Management (EM) Division have been developing various vitrification technologies as a treatment approach for the large quantities of transuranic (TRU), TRU mixed and Mixed Low Level Wastes that are stored in either landfills or above ground storage facilities. The technologies being developed include joule heated, plasma torch, plasma arc, induction, microwave, combustion, molten metal, and in situ methods. There are related efforts going into development glass, ceramic, and slag waste form windows of opportunity for the diverse quantities of heterogeneous wastes needing treatment. These studies look at both processing parameters, and long term performance parameters as a function of composition to assure that developed technologies have the right chemistry for success.

  8. Environmental Management vitrification activities

    International Nuclear Information System (INIS)

    Krumrine, P.H.

    1996-01-01

    Both the Mixed Waste and Landfill Stabilization Focus Areas as part of the Office of Technology Development efforts within the Department of Energy's (DOE) Environmental Management (EM) Division have been developing various vitrification technologies as a treatment approach for the large quantities of transuranic (TRU), TRU mixed and Mixed Low Level Wastes that are stored in either landfills or above ground storage facilities. The technologies being developed include joule heated, plasma torch, plasma arc, induction, microwave, combustion, molten metal, and in situ methods. There are related efforts going into development glass, ceramic, and slag waste form windows of opportunity for the diverse quantities of heterogeneous wastes needing treatment. These studies look at both processing parameters, and long term performance parameters as a function of composition to assure that developed technologies have the right chemistry for success

  9. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  10. 78 FR 21965 - Notice of Availability of the Draft Tri-County Resource Management Plan and Draft Environmental...

    Science.gov (United States)

    2013-04-12

    ..., cultural, and ecological resource values. Proposed resource-use limitations include: Exclusion or avoidance....) The ACEC would be managed for ecological and cultural resource values. Proposed resource-use... species and ecological resource values. Proposed resource- use limitations include: Avoidance of new...

  11. Developing formal asset management plans

    Science.gov (United States)

    2014-06-01

    This report highlights key recommendations and best practices identified at the peer exchange on Transportation Asset Management Plans (TAMP), held on February 5 and 6, 2014, in Columbia, South Carolina. This event was sponsored by the Transportation...

  12. Environmental management in nuclear industry

    International Nuclear Information System (INIS)

    Pillai, K.C.; Bhat, I.S.

    1988-01-01

    Safety of the environment is given due attention right at the design state of nuclear energy installations. Besides this engineered safety environmental protection measures are taken on (a) site selection criteria (b) waste management practices (c) prescribing dose limits for the public (d) having intensive environmental surveillance programme and (e) emergency preparedness. The paper enumerates the application of these protection measures in the environmental management to make the nuclear industry as an example to follow in the goal of environmental safety. (author)

  13. Performance planning and measurement for DOE EM-International Technology Integration Program. A report on a performance measurement development workshop for DOE's environmental management international technology integration program

    International Nuclear Information System (INIS)

    Jordan, G.B.; Reed, J.H.; Wyler, L.D.

    1997-03-01

    This report describes the process and results from an effort to develop metrics for program accomplishments for the FY 1997 budget submission of the U.S. Department of Energy Environmental Management International Technology Integration Program (EM-ITI). The four-step process included interviews with key EM-ITI staff, the development of a strawman program logic chart, and all day facilitated workshop with EM-ITI staff during which preliminary performance plans and measures were developed and refined, and a series of follow-on discussions and activities including a cross-organizational project data base. The effort helped EM-ITI to crystallize and develop a unified vision of their future which they can effectively communicate to their own management and their internal and external customers. The effort sets the stage for responding to the Government Performance and Results Act. The metrics developed may be applicable to other international technology integration programs. Metrics were chosen in areas of eight general performance goals for 1997-1998: (1) number of forums provided for the exchange of information, (2) formal agreements signed, (3) new partners identified, (4) customers reached and satisfied, (5, 6) dollars leveraged by EM technology focus area and from foreign research, (7) number of foreign technologies identified for potential use in remediation of DOE sites, and (8) projects advanced through the pipeline

  14. Idaho National Laboratory Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2008-04-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  15. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2012-08-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  16. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2010-10-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  17. Collaborative environmental planning in river management: an application of multicriteria decision analysis in the White River Watershed in Vermont.

    Science.gov (United States)

    Hermans, Caroline; Erickson, Jon; Noordewier, Tom; Sheldon, Amy; Kline, Mike

    2007-09-01

    Multicriteria decision analysis (MCDA) provides a well-established family of decision tools to aid stakeholder groups in arriving at collective decisions. MCDA can also function as a framework for the social learning process, serving as an educational aid in decision problems characterized by a high level of public participation. In this paper, the framework and results of a structured decision process using the outranking MCDA methodology preference ranking organization method of enrichment evaluation (PROMETHEE) are presented. PROMETHEE is used to frame multi-stakeholder discussions of river management alternatives for the Upper White River of Central Vermont, in the northeastern United States. Stakeholders met over 10 months to create a shared vision of an ideal river and its services to communities, develop a list of criteria by which to evaluate river management alternatives, and elicit preferences to rank and compare individual and group preferences. The MCDA procedure helped to frame a group process that made stakeholder preferences explicit and substantive discussions about long-term river management possible.

  18. Managing environmental aspects resulting from energy consumption

    International Nuclear Information System (INIS)

    2001-01-01

    Human health and environmental impacts of fossil fuel energy consumptions are examined and the ongoing effort to align energy management plans with sustainable development strategies and environmental management systems is described. Human health impacts are manifested in mortality rates, hospital admissions, visits to emergency rooms and physicians' offices, reduced physical performance, increase in the use of medications, impaired pulmonary function and a variety of lesser (or less perceptible) effects. Environmental impacts are demonstrated through climatic change, increase in greenhouse gas emissions, increase in smog, acid rain, and soil, groundwater and surface water contamination. The importance of commitment, integrated planning, measurement and evaluation, periodic review and improvement and documentation in aligning energy and environmental management plans are highlighted, along with the need for behavioral and operational changes, the creation of employee awareness and training, and the adoption of green procurement and life cycle costing. Adoption of the ISO 14000 approach to managing energy consumption is also seen as an important step in the direction of integrated energy and environmental management and sustainable development

  19. Construction Management: Planning Ahead.

    Science.gov (United States)

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  20. BUDGET PLANNING IN FINANCIAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Nataliya Melnichuk

    2015-11-01

    Full Text Available The purpose of the paper is to determine the nature, targets, functions, principles and methods of budget planning and development of classifications due to its types. The essence of budget planning presented by various authors, is own interpretation (the process of developing a plan of formation, distribution and redistribution of financial funds according to budget system units during the reporting period based on budgetary purposes and targets defined by socio-economic development strategy is proposed. Methodology. The following methods such as cognition, induction, deduction, analysis and synthesis have been used in the process of survey. Results of the survey proves that budget planning plays an essential role in the financial management. On condition business environment changing even the best management system can become obsolete. The immediate reaction to the new trends in the financial system as a whole, in the industry is possible with budget planning as well. It also allows to make appropriate adjustments to the plans. Adjustment of long-term, medium-term and short-term plans makes it possible, without changing goals, to change ways of their achievement and thus to raise the level of efficiency of budget funds formation and use. It is necessary to revise the whole system plans, including their mission and goals in the case of global changes in the external and internal environment. Practical implications. The proposed approach to the classification of budget planning types allows to cope with the shortcomings of modern planning in the public sector (the development of the targets according to the state budget expenditures in Ukraine remains a formality and it rarely complies with realities. Value/originality is specified in the proposed interpretation which differs from existing ones that provides clarification of budget planning purpose in financial management; classification of budget planning principles, which differs from previous

  1. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  2. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE's Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES ampersand H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report

  3. Puget Sound Area Electric Reliability Plan. Appendix D, Conservation, Load Management and Fuel Switching Analysis : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    Various conservation, load management, and fuel switching programs were considered as ways to reduce or shift system peak load. These programs operate at the end-use level, such as residential water heat. Figure D-1a shows what electricity consumption for water heat looks like on normal and extreme peak days. Load management programs, such as water heat control, are designed to reduce electricity consumption at the time of system peak. On the coldest day in average winter, system load peaks near 8:00 a.m. In a winter with extremely cold weather, electricity consumption increases fr all hours, and the system peak shifts to later in the morning. System load shapes in the Puget Sound area are shown in Figure D-1b for a normal winter peak day (February 2, 1988) and extreme peak day (February 3, 1989). Peak savings from any program are calculated to be the reduction in loads on the entire system at the hour of system peak. Peak savings for all programs are measured at 8:00 a.m. on a normal peak day and 9:00 a.m. on an extreme peak day. On extremely cold day, some water heat load shifts to much later in the morning, with less load available for shedding at the time of system peak. Models of hourly end-use consumption were constructed to simulate the impact of conservation, land management, and fuel switching programs on electricity consumption. Javelin, a time-series simulating package for personal computers, was chosen for the hourly analysis. Both a base case and a program case were simulated. 15 figs., 7 tabs.

  4. Adaptive Management of Environmental Flows

    Science.gov (United States)

    Webb, J. Angus; Watts, Robyn J.; Allan, Catherine; Conallin, John C.

    2018-03-01

    Adaptive management enables managers to work with complexity and uncertainty, and to respond to changing biophysical and social conditions. Amid considerable uncertainty over the benefits of environmental flows, governments are embracing adaptive management as a means to inform decision making. This Special Issue of Environmental Management presents examples of adaptive management of environmental flows and addresses claims that there are few examples of its successful implementation. It arose from a session at the 11th International Symposium on Ecohydraulics held in Australia, and is consequently dominated by papers from Australia. We classified the papers according to the involvement of researchers, managers and the local community in adaptive management. Five papers report on approaches developed by researchers, and one paper on a community-led program; these case studies currently have little impact on decision making. Six papers provide examples involving water managers and researchers, and two papers provide examples involving water managers and the local community. There are no papers where researchers, managers and local communities all contribute equally to adaptive management. Successful adaptive management of environmental flows occurs more often than is perceived. The final paper explores why successes are rarely reported, suggesting a lack of emphasis on reflection on management practices. One major challenge is to increase the documentation of successful adaptive management, so that benefits of learning extend beyond the project where it takes place. Finally, moving towards greater involvement of all stakeholders is critical if we are to realize the benefits of adaptive management for improving outcomes from environmental flows.

  5. Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992

    International Nuclear Information System (INIS)

    Latham, A.R.; Evans, R.B.

    1991-11-01

    DOE Order 5400.1, ''General Environmental Protection Program,'' established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Field Office, Nevada (DOE/NV) has prepared this second annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Operations (AMO), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions. 7 figs

  6. The EPA-Wide Plan to Provide Solid Waste Management Capacity Assistance to Tribes

    Science.gov (United States)

    This Plan is a strategy for building tribal capacity to manage solid waste. The Plan promotes the development and implementation of integrated waste management plans and describes how EPA will prioritize its resources to maximize environmental benefits.

  7. Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    2004-01-01

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not

  8. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  9. Environmental marketing within organic agriculture system management

    OpenAIRE

    O. Shkuratov; V. Kyporenko

    2015-01-01

    This paper deals with economic content of environmental marketing in the management system organic agriculture that allows operators of organic market to effectively plan the production of organic agricultural products and ensure the optimal balance between social and economic indicators throughout the life cycle of the product. Structural-logical scheme on the formation of environmentally oriented motivation of organic agricultural products consumer behavior has been grounded.

  10. Revealing Adaptive Management of Environmental Flows

    Science.gov (United States)

    Allan, Catherine; Watts, Robyn J.

    2018-03-01

    Managers of land, water, and biodiversity are working with increasingly complex social ecological systems with high uncertainty. Adaptive management (learning from doing) is an ideal approach for working with this complexity. The competing social and environmental demands for water have prompted interest in freshwater adaptive management, but its success and uptake appear to be slow. Some of the perceived "failure" of adaptive management may reflect the way success is conceived and measured; learning, rarely used as an indicator of success, is narrowly defined when it is. In this paper, we document the process of adaptive flow management in the Edward-Wakool system in the southern Murray-Darling Basin, Australia. Data are from interviews with environmental water managers, document review, and the authors' structured reflection on their experiences of adaptive management and environmental flows. Substantial learning occurred in relation to the management of environmental flows in the Edward-Wakool system, with evidence found in planning documents, water-use reports, technical reports, stakeholder committee minutes, and refereed papers, while other evidence was anecdotal. Based on this case, we suggest it may be difficult for external observers to perceive the success of large adaptive management projects because evidence of learning is dispersed across multiple documents, and learning is not necessarily considered a measure of success. We suggest that documentation and sharing of new insights, and of the processes of learning, should be resourced to facilitate social learning within the water management sector, and to help demonstrate the successes of adaptive management.

  11. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  12. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  13. Strategic Environmental Assessment: Integrated environmental management

    CSIR Research Space (South Africa)

    Department of Environmental Affairs and Tourism

    2004-01-01

    Full Text Available stream_source_info Department of Environmental Affairs and Tourism_2004.pdf.txt stream_content_type text/plain stream_size 70155 Content-Encoding ISO-8859-1 stream_name Department of Environmental Affairs and Tourism_2004.pdf... and Tourism Other topics in the series of overview information documents on the concepts of, and approaches to, integrated environmental management are listed below. Further titles in this series are being prepared and will be made available periodically...

  14. Parking management : strategies, evaluation and planning

    International Nuclear Information System (INIS)

    Litman, T.A.

    2006-01-01

    Parking facilities are a major cost to society. Current planning practices are based on the assumption that parking should be abundant and provided free, with costs borne indirectly. This report examined parking management strategies related to integrated parking plans. Problems with current parking planning practices were reviewed. The costs of parking facilities were examined, as well as the savings that can accrue from improved management techniques. Strategies included shared parking; remote parking and shuttle services; walking and cycling improvements; improved enforcement and control; and increasing the capacity of existing parking facilities. Parking pricing methods, financial incentives and parking tax reforms were reviewed. Issues concerning user information and marketing were examined. Overflow parking plans were evaluated. Three illustrative examples of parking management programs were outlined, along with details of implementation, planning and evaluation procedures. It was concluded that cost-effective parking management programs can often reduce parking requirements by 20 to 40 per cent compared with conventional planning requirements, in addition to providing economic, social and environmental benefits. 32 refs., 7 tabs., 3 figs

  15. AVLIS production plant waste management plan

    International Nuclear Information System (INIS)

    1984-01-01

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables

  16. Environmental health action plan for Europe

    International Nuclear Information System (INIS)

    1994-06-01

    This Environmental Health Action Plan for Europe was endorsed by the second European Conference on Environment and Health, held in Helsinki, 20 to 22 June 1994. It sets out directions for the attainment of long term environment and health policy objectives define in the European Charter on Environment and Health. The Action Plan is primarily addressed at the public health and environmental protection sectors. 10 refs, 4 figs, 2 tabs

  17. Underground storage tank management plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations

  18. Underground storage tank management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  19. Environmental management frameworks for offshore mining: the New Zealand approach

    KAUST Repository

    Ellis, Joanne

    2017-07-27

    The New Zealand region contains untapped natural mineral, oil, and gas resources while also supporting globally unique and diverse faunal communities that need to be managed sustainably. In this paper key information from the international literature is reviewed that can underpin an Environmental Mining Management System which includes elements of Environmental Risk Assessment, Environmental Impact Assessment and Environmental Management Planning. This paper focuses on four developing areas of seafloor mining activities presently being undertaken or planned in the New Zealand region: hydrocarbons (oil and gas), minerals, ironsands and phosphorite nodules. A number of issues with the implementation of environmental management systems are identified including the difficulty of assessing new marine activities or technologies and the need for standardised reporting metrics. Finally, the development of ecosystem-based management and marine spatial planning is discussed which will be required to enhance environmental mining management frameworks in New Zealand.

  20. Auditing of environmental management system

    Directory of Open Access Journals (Sweden)

    Čuchranová Katarína

    2001-12-01

    Full Text Available Environmental auditing has estabilished itself as a valueable instrument to verify and help to improve the environmental performance.Organizations of all kinds may have a need to demonstrate the environmental responsibility. The concept of environmental management systems and the associated practice of environmental auditing have been advanced as one way to satisfy this need.These system are intended to help an organization to establish and continue to meet its environmental policies, objectives, standards and other requirements.Environmental auditing is a systematic and documented verification process of objectively obtaining and evaluating audit evidence to determine whether an organizations environmental management system conforms to the environmental management system audit criteria set by the organization and for the communication of the results of this process to the management.The following article intercepts all parts of preparation environmental auditing.The audit programme and procedures should cover the activities and areas to be considered in audits, the frequency of audits, the responsibilities associated with managing and conducting audits, the communication of audit results, auditor competence, and how audits will be conducted.The International Standard ISO 140011 estabilishes the audit procedures that determine conformance with EMS audit criteria.

  1. Environmental Management Strategy: Four Forces Analysis

    Science.gov (United States)

    Doyle, Martin W.; Von Windheim, Jesko

    2015-01-01

    We develop an analytical approach for more systematically analyzing environmental management problems in order to develop strategic plans. This approach can be deployed by agencies, non-profit organizations, corporations, or other organizations and institutions tasked with improving environmental quality. The analysis relies on assessing the underlying natural processes followed by articulation of the relevant societal forces causing environmental change: (1) science and technology, (2) governance, (3) markets and the economy, and (4) public behavior. The four forces analysis is then used to strategize which types of actions might be most effective at influencing environmental quality. Such strategy has been under-used and under-valued in environmental management outside of the corporate sector, and we suggest that this four forces analysis is a useful analytic to begin developing such strategy.

  2. Environmental management strategy: four forces analysis.

    Science.gov (United States)

    Doyle, Martin W; Von Windheim, Jesko

    2015-01-01

    We develop an analytical approach for more systematically analyzing environmental management problems in order to develop strategic plans. This approach can be deployed by agencies, non-profit organizations, corporations, or other organizations and institutions tasked with improving environmental quality. The analysis relies on assessing the underlying natural processes followed by articulation of the relevant societal forces causing environmental change: (1) science and technology, (2) governance, (3) markets and the economy, and (4) public behavior. The four forces analysis is then used to strategize which types of actions might be most effective at influencing environmental quality. Such strategy has been under-used and under-valued in environmental management outside of the corporate sector, and we suggest that this four forces analysis is a useful analytic to begin developing such strategy.

  3. Solid Waste Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  4. Oak Ridge National Laboratory Waste Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented

  5. Environmental management: The bank's policy approach

    International Nuclear Information System (INIS)

    1992-01-01

    In order to play a leadership role in the environmental recovery of central and eastern Europe, the Bank will pursue the following policy priorities: assistance to the countries of operations in environmental policy formulation, including the development of effective legal and regulatory instruments, the adoption of appropriate emissions and effluents standards and the creation of the institutional and human resources capacity to monitor and enforce them; promoting the use of a variety of economic instruments to address the underlying cause of environmental degradation and the adoption of market-based techniques in environmental management programmes; encouraging the development of an environmental goods and services industry in the countries of operations, of commercially viable investments in environmental technologies and pollution prevention and control, and by funding environmental infrastructure projects; initiation of, or support for, special studies and programmes to address regional and national environmental problems and to promote environmental education within the population and institutions of the countries of operations; adoption of adequate environmental assessment, management planning, audit and monitoring procedures throughout its activities; and promoting the adoption and implementation of procedures for provision of information to, and consultation with, all levels of government and the general public - especially potentially affected parties - concerning environmental matters

  6. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  7. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  8. A nation-wide system for landslide mapping and risk management in Italy: The second Not-ordinary Plan of Environmental Remote Sensing

    Science.gov (United States)

    Di Martire, D.; Paci, M.; Confuorto, P.; Costabile, S.; Guastaferro, F.; Verta, A.; Calcaterra, D.

    2017-12-01

    Landslides are frequent events that may cause human casualties and injuries as well as damage to urban and man-made structures, with extensive loss of economic resources. For this reason, landslide mapping is a primary tool for hazard and risk assessment. Italian Ministry of Environment, thanks to great availability and functionality of Synthetic Aperture Radar (SAR) data promoted the Not-ordinary Plan of Environmental Remote Sensing (Piano Straordinario di Telerilevamento Ambientale, PST-A in Italian) in 2008, as to constitute a national database of active or potential instability phenomena affecting the Italian territory, based on the exploitation of interferometric products (ERS and ENVISAT). In this paper, the PST-A-3 is described. A procedure based on the integration of engineering-geological approaches and SAR interferometry data belonging to COSMO-SkyMed constellation (100 frames 40 × 40 km) has been here implemented over 7,400 km2 of the Italian territory. First, landslides have been mapped by field geologists, defining type and state of activity. Simultaneously to field surveys, remote sensing data have been analyzed as to detect areas with considerable displacement registered by the satellite. Both products have been overlaid, also quantifying the coincidence between the events reported according to the two detection methodologies and subtracting those landslide not recordable by the satellite, finally obtaining an updated landslide inventory map with 4,522 newly detected phenomena. Therefore, PST-A-3 proves to be a valuable system for local authorities, in order to provide a contribution to risk management but also for the forecasting of landslide events, as testified by two case studies selected. Thanks to the PST-A experience, the use of such strategy to other countries could represent a valid contribution to land management at worldwide scale.

  9. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  10. Corporate environmental management

    DEFF Research Database (Denmark)

    Madsen, Henning; Ulhøi, John Parm

    With increasing population and economic growth and related demand for energy and natural resources as well, pollution, waste production and environmental sustainability have become issues of uttermost importance. For quite some time self-regulation, i.e. voluntary implementation of environmental......: how does industry respond to the environmental challenge? The paper concludes that despite the apparent attractiveness of self-regulation in industry, voluntary options tend not to be widely adopted thus pointing to a continued strong need for an effective regulation of industry’s environmental...

  11. Liquidity management through financial planning

    OpenAIRE

    Kameníková Katarína

    2001-01-01

    One of the basic goals of financial management is to provide financial property and capital for running of the firm, as well as for its development, that means provide optimal firm´s liquidity.To improve liquidity is possible provide through various ways. In present time there is increasing importance of financial planning., where planning of liquidity presents one of its integral part. Therefore I deal in presented paper with possible liquidity improvement through calculation of financial pl...

  12. Environmental considerations in physical planning in Norway and Poland

    Energy Technology Data Exchange (ETDEWEB)

    Naess, P; Saglie, I L; Glowacki, W; Dunin-Woyseth, H

    1998-12-31

    As a part of an agreement on environmental cooperation between Norway and Eastern Europe, a comparative case study was carried out of environmental considerations in physical planning since 1968 in the Norwegian municipality of Sandefjord and the Polish municipality of Myslenice. This report discusses the final results. Land use planning is surprisingly similar in the two countries. In both, the plans emphasize the protection of farmland and scarce biotopes as well as sewage management. In Myslenice, a major concern has been cultural heritage and cultural landscapes while in Sandefjord attention was paid more to natural areas for outdoor recreation. In both cases there has been little focus on energy conservation and the concept of sustainable development has hardly been discussed. The plans have been considerably influenced by national environmental policies. The type of political system, capitalism vs. state socialism, has indirectly influenced the amount of construction and hence the pace of conversion of undeveloped land, but does not appear to have had much impact on the environmental content of the plans. The emphasis laid on various environmental issues in part reflects the actual local challenges, but also cross-national cultural differences and the fact that during the period the environmental agenda has been widened in both municipalities, most clearly seen in the case of Sandefjord. The plans seem to have been considerably influenced by professional ideals, knowledge and methods common among planners across national boundaries. 52 refs., 1 figure, 2 tabs.

  13. Environmental considerations in physical planning in Norway and Poland

    Energy Technology Data Exchange (ETDEWEB)

    Naess, P.; Saglie, I.L.; Glowacki, W.; Dunin-Woyseth, H.

    1997-12-31

    As a part of an agreement on environmental cooperation between Norway and Eastern Europe, a comparative case study was carried out of environmental considerations in physical planning since 1968 in the Norwegian municipality of Sandefjord and the Polish municipality of Myslenice. This report discusses the final results. Land use planning is surprisingly similar in the two countries. In both, the plans emphasize the protection of farmland and scarce biotopes as well as sewage management. In Myslenice, a major concern has been cultural heritage and cultural landscapes while in Sandefjord attention was paid more to natural areas for outdoor recreation. In both cases there has been little focus on energy conservation and the concept of sustainable development has hardly been discussed. The plans have been considerably influenced by national environmental policies. The type of political system, capitalism vs. state socialism, has indirectly influenced the amount of construction and hence the pace of conversion of undeveloped land, but does not appear to have had much impact on the environmental content of the plans. The emphasis laid on various environmental issues in part reflects the actual local challenges, but also cross-national cultural differences and the fact that during the period the environmental agenda has been widened in both municipalities, most clearly seen in the case of Sandefjord. The plans seem to have been considerably influenced by professional ideals, knowledge and methods common among planners across national boundaries. 52 refs., 1 figure, 2 tabs.

  14. Environment, Safety, Health and Waste Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Feed Materials Production Center (FMPC) is the production of high qaulity uranium metal for use by the US Department of Energy (DOE) in Defense Programs. In order to accomplish this mission and to maintain the FMPC as a viable facility in the DOE production complex, the facility must be brought into full compliance with all federal and state regulations and industry standards for environmental protection and worker safety. Where past practices have resulted in environmental insult, a comprehensive program of remediation must be implemented. The purpose of this combined Environment, Safety, Health and Waste Management Plan is to provide a road map for achieving needed improvements. The plan is structured to provide a comprehensive projection from the current fiscal year (FY) through FY 1994 of the programs, projects and funding required to achieve compliance. To do this, the plan is subdivided into chapters which discuss the applicable regulations;project schedules and funding requirements;details of the various programs for environment, safety, health and waste management;details of the ongoing National Environmental Policy Act (NEPA);the quality assurance program and the environmental monitoring program. 14 refs., 30 figs., 29 tabs

  15. The Wildcat-San Pablo Creek Flood Control Project and Its Implications for the Design of Environmentally Sensitive Flood Management Plans

    Science.gov (United States)

    A. L. Riley

    1989-01-01

    In 1982 a coalition of neighborhood and environmental organizations used a community organizing strategy of the early 1960's, referred to as "advocacy planning" to substantially redesign a traditional structural type of joint federal and local flood control project on Wildcat and San Pablo Creeks in North Richmond, California. Using a combination of...

  16. Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    2008-01-01

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  17. Data management for environmental research

    International Nuclear Information System (INIS)

    Strand, R.H.

    1976-01-01

    The objective of managing environmental research data is to develop a resource sufficient for the study and potential solution of environmental problems. Consequently, environmnetal data management must include a broad spectrum of activities ranging from statistical analysis and modeling, through data set archiving to computer hardware procurement. This paper briefly summarizes the data management requirements for environmental research and the techniques and automated procedures which are currently used by the Environmental Sciences Division at Oak Ridge National Laboratory. Included in these requirements are readily retrievable data, data indexed by categories for retrieval and application, data documentation (including collection methods), design and error bounds, easily used analysis and display programs, and file manipulation routines. The statistical analysis system (SAS) and other systems provide the automated procedures and techniques for analysis and management of environmental research data

  18. The hydrographic basin a space for the environmental planning

    International Nuclear Information System (INIS)

    Dunoyer Mejia Monica

    2002-01-01

    This paper is a synthesis of the work done in watershed management in the framework of sustainable development in Caldas, it describes different points of view to the watershed management approaches as well as its legal aspects developed in the recent history of Colombia. You will also find different basins delineations according to the size, spatial scale used, and the proposed objectives to achieve different goals in watershed management as a way to do environmental planning. At the end of this paper you will find a description of the methodological faces used to achieve a so-called ordering plan, based on legal. Parameters used to date in Colombia

  19. Environmental Remediation Data Management Tools

    International Nuclear Information System (INIS)

    Wierowski, J. V.; Henry, L. G.; Dooley, D. A.

    2002-01-01

    Computer software tools for data management can improve site characterization, planning and execution of remediation projects. This paper discusses the use of two such products that have primarily been used within the nuclear power industry to enhance the capabilities of radiation protection department operations. Advances in digital imaging, web application development and programming technologies have made development of these tools possible. The Interactive Visual Tour System (IVTS) allows the user to easily create and maintain a comprehensive catalog containing digital pictures of the remediation site. Pictures can be cataloged in groups (termed ''tours'') that can be organized either chronologically or spatially. Spatial organization enables the user to ''walk around'' the site and view desired areas or components instantly. Each photo is linked to a map (floor plan, topographical map, elevation drawing, etc.) with graphics displaying the location on the map and any available tour/component links. Chronological organization enables the user to view the physical results of the remediation efforts over time. Local and remote management teams can view these pictures at any time and from any location. The Visual Survey Data System (VSDS) allows users to record survey and sample data directly on photos and/or maps of areas and/or components. As survey information is collected for each area, survey data trends can be reviewed for any repetitively measured location or component. All data is stored in a Quality Assurance (Q/A) records database with reference to its physical sampling point on the site as well as other information to support the final closeout report for the site. The ease of use of these web-based products has allowed nuclear power plant clients to plan outage work from their desktop and realize significant savings with respect to dose and cost. These same tools are invaluable for remediation and decommissioning planning of any scale and for recording

  20. Environmental Monitoring Plan for the Oak Ridge Reservation, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, Sharon D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-10-01

    The purpose of Oak Ridge Reservation (ORR) environmental surveillance is to characterize radiological and nonradiological conditions of the off-site environs and estimate public doses related to these conditions, confirm estimations of public dose based on effluent monitoring data, and, where appropriate, provide supplemental data to support compliance monitoring for applicable environmental regulations. This environmental monitoring plan (EMP) is intended to document the rationale, frequency, parameters, and analytical methods for the ORR environmental surveillance program and provides information on ORR site characteristics, environmental pathways, dose assessment methods, and quality management. ORR-wide environmental monitoring activities include a variety of media including air, surface water, vegetation, biota, and wildlife. In addition to these activities, site-specific effluent, groundwater, and best management monitoring programs are conducted at the Oak Ridge National Laboratory (ORNL), the Y-12 National Security Complex (Y-12), and the East Tennessee Technology Park (ETTP). This is revision 5.

  1. 40 CFR 60.55c - Waste management plan.

    Science.gov (United States)

    2010-07-01

    ... management plan shall identify both the feasibility and the approach to separate certain components of solid... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Waste management plan. 60.55c Section 60.55c Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED...

  2. Using management action plans to integrate program improvement efforts

    Energy Technology Data Exchange (ETDEWEB)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N. [Project Performance Corporation, Sterling, VA (United States)

    1994-12-31

    The Department of Energy`s (DOE`s) Environmental Management Program is the country`s largest and most sophisticated environmental program to date. The rapid expansion of the DOE`s environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program`s management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities.

  3. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  4. Environmental Restoration Program Control Management System

    International Nuclear Information System (INIS)

    Duke, R.T.

    1992-01-01

    Environmental Restoration managers need to demonstrate that their programs are under control. Unlike most industrial programs, the public is heavily involved in Environmental Restoration activities. The public is demanding that the country prove that real progress is being made towards cleaning up the environment. A Program Control Management System can fill this need. It provides a structure for planning, work authorization, data accumulation, data analysis and change control. But it takes time to implement a control system and the public is losing its patience. This paper describes critical items essential to the quick development and implementation of a successful control system

  5. Environmental management & audit 2: Management systems

    OpenAIRE

    2018-01-01

    The present scientific monograph, entitled “Environmental management & audit“, is the result of three years’ work on an international project entitled “Environmental management in Russian companies – retraining courses for the sensibilization for and integration of Eco-Audit programs in corporate decision-making (RECOAUD)”. Within its more than 600 pages, the monograph features interesting texts written by 31 authors from the European Union and the Russian Federation, edited by dr. Borut Jere...

  6. SEA of river basin management plans

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen; Kørnøv, Lone

    2009-01-01

    In, 2000 the European Parliament and the European Council passed the Water Framework Directive (WFD) to be implemented in all Member States. The consequence of the directive is that river basin management plans (RBMPs) shall be prepared which are legally subject to a strategic environmental...... assessment (SEA). An important environmental factor for the water sector is climate change, especially the changes it causes to the water environment. However, based on an argument of an inadequate knowledge base regarding climate change impacts, the prospect of Danish authorities including climate change...

  7. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  8. Waste management plan for inactive LLLW tanks 3001-B, 3004-B, 3013, and T-30 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-07-01

    This Project Waste Management Plan identifies the waste that is expected to be generated in connection with the removal and disposition of inactive liquid low-level radioactive waste tanks 3001-B, 3004-B, and T-30, and grouting of tank 3013 at the Oak Ridge National Laboratory and the isolation of these tanks' associated piping systems. The plan also identifies the organization, responsibilities, and administrative controls that will be followed to ensure proper handling of the waste

  9. Scope of environmental risk management

    Energy Technology Data Exchange (ETDEWEB)

    O' Riordan, T

    1979-01-01

    Environmental risk management embraces three techniques for project appraisal: cost/benefit analysis, environmental impact analysis and risk assessment. It also explicitly relates scientific investigations to political judgments, sometimes so closely that the two cannot be separated. Indeed it is now apparent that environmental risk management encompasses procedures both to review the relative merits and priorities of policies as well as to appraise the environmental risks of particular schemes. Until recently this relationship has not been fully appreciated, so much imagination and innovation is still required to develop the most-suitable mechanisms for review.

  10. Regional Management Plan: Summary report

    International Nuclear Information System (INIS)

    Drobny, N.L.

    1986-01-01

    This summary report describes the results of a 16-month project to develop a Regional Management Plan for low-level radioactive waste management in a seven-state area. The seven states are Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio, and Wisconsin. These states have formed the Midwest Interstate Low-Level Radioactive Waste Commission in accord with Congressional requirements established in 1980. 14 refs., 13 figs., 9 tabs

  11. Environmental risk management

    International Nuclear Information System (INIS)

    Parris, P.A.

    1994-01-01

    A professional, audit able environmental approach is the only path a responsible government, institution or company can take. Such an approach can be applied to a small petrol station, an oil refinery or a multi-million dollar mining development. Environmental issues cannot be divorced from socio-economic criteria; each impacts on the other. Twenty years ago, financial criteria ruled decision making and the environment tagged along a poor third to social and safety issues. Today, financial issued are still dominant, but decision makers realised that environmental issues hold the same weight as socio-economic criteria and the three are inexorably intertwined. (author)

  12. FY 2001 Hanford Waste Management Strategic Plan

    International Nuclear Information System (INIS)

    COLLINS, M.S.

    2001-01-01

    We are pleased to present the 2001 Hanford Waste Management Program Strategic Plan. This plan supports the newly developed U. S. Department of Energy Site outcomes strategy. The 2001 Plan reflects current and projected needs for Waste Management Program services in support of Hanford Site cleanup, and updates the objectives and actions using new waste stream oriented logic for the strategic goals: (1) waste treatment/processing, storage, and disposal; (2) interfaces; and (3) program excellence. Overall direction for the Program is provided by the Waste Management Division, Office of the Assistant Manager for Environmental Restoration and Waste Management, U. S. Department of Energy, Richland Operations Office. Fluor Hanford, Inc. is the operating contractor for the program. This Plan documents proactive strategies for planning and budgeting, with a major focus on helping meet regulatory commitments in a timely and efficient manner and concurrently assisting us in completing programs cheaper, better and quicker. Newly developed waste stream oriented logic was incorporated to clarify Site outcomes. External drivers, technology inputs, treatment/processing, storage and disposal strategies, and stream specific strategies are included for the six major waste types addressed in this Plan (low-level waste, mixed low-level waste, contact-handled transuranic waste, remote-handled transuranic waste, liquid waste, and cesium/strontium capsules). The key elements of the strategy are identification and quantification of the needs for waste management services, assessment of capabilities, and development of cost-effective actions to meet the needs and to continuously improve performance. Accomplishment of specific actions as set forth in the Plan depends on continued availability of the required resources and funding. The primary objectives of Plan are: (1) enhance the Waste Management Program to improve flexibility, become more holistic especially by implementing new

  13. ETHICAL ASPECTS OF ENVIRONMENTAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cîrstea Ştefan-Dragoş

    2013-07-01

    Full Text Available The purpose of this article is to outline the main economical and social benefits that can be obtained by adopting an ethical attitude of the organisations which use a performant environmental management. From the idea that the human being is the master of nature, it was passed to the view according to which the human being must ensure a balance between consumption and the use of resources. In order to achieve our goal we identified the factors that lead to long term or even permanent destructive effects over the environment and we briefly present the reasons for which the organizations adopt and implement environmental management systems. Also, the difficulties encountered in implementing environmental strategies have been briefly enumerated and the competitive and economic advantages that can be achieved by adopting an efficient environmental management and the main reasons that grant to the environmental management a special significance were exposed. This theoretical paper emphasizes the importance of the adoption by organizations of a "green behavior" and reveals correlations between sustainability, economic growth and environmental performance in organizations. The analysis of the ethical aspects of environmental management shows the links that can be created between the development of an ethical culture of organizations and the achievement of the environmental excellence. The research provides an overview of the concept of environmental ethics and encloses it within the scope of environmental management. Someone needs to explain why an increasing number of organizations, both large and small, are setting up environmental management systems, making environmental investments and reducing risks over and beyond legal requirements, even when the benefits are not at all obvious, even in the long run. Also, this paper provides some practical examples of organizations environmental problems and points out how these organizations adapted their

  14. Cofrentes NPP Knowledge management plan

    International Nuclear Information System (INIS)

    Pardo Gonzalez, F.

    2016-01-01

    The main objective of the Knowledge Management Plan at Cofrentes Nuclear Power Plant is therefore to establish the steps to be followed for distributing and sharing the existing knowledge at the Plant through collaboration and continuous learning and exchanges with internal and external groups. It is also very important that staff and organisational learning is closely in line with Plant expectations. (Author)

  15. Capacity Planning and Leadtime management

    NARCIS (Netherlands)

    Zijm, Willem H.M.; Buitenhek, R.

    1996-01-01

    In this paper we discuss a framework for capacity planning and lead time management in manufacturing companies, with an emphasis on the machine shop. First we show how queueing models can be used to find approximations of the mean and the variance of manufacturing shop lead times. These quantities

  16. Peat in environmental management

    International Nuclear Information System (INIS)

    Rinttilae, R.

    1998-01-01

    Peat is the largest natural resource of Finland. The DS-reserves of peat are more than seven times larger than those of wood. Peat is known as a domestic source of energy. Peat is, however, more than an energy source. The most significant problem of water protection in Finland is the eutrophication of the water courses. The reduction of concentrated loads and large emissions sources has up to now been the target for the water protection. The control of diffuse loads has been more difficult. The environmental use of peat can reduce the loads on watercourses, and especially the diffuse emissions. The natural and unique properties of peat can be utilized in several targets: agriculture, pisciculture, fur farming, in small and medium sized industry, and in processing of waste waters of both municipalities and rural areas, as well as in different environmental hazards. The present use of environmental peat is just a small fragment of the annual growth of peat reserves in Finland. The amount of protected mires is about ten times larger than the amount of peatlands taken into peat production. The use of environmental peat makes it possible to reduce the diffuse loads significantly in the future. This, however, requires willingness of cooperation and development by the entrepreneurs, authorities, and peat producers. The present use of agricultural peat binds about three times more phosphor and nearly one and a half fold nitrogen fertilizers compare to the emissions caused by peat production. It has to be noticed that the utilization of peat in reduction of environmental loads does not cause any secondary waste problem. The final product formed can usually be composted and used e.g. in soil remediation or in construction of green areas. The tightening environmental regulations and international agreements increase the utilization of peat. As the demand of peat increased the quality requirements for peat will be increased. Certain grain size and the restoration of the

  17. Planning and management of change

    International Nuclear Information System (INIS)

    Nelson, R.M. Jr.; Statton, C.T.; St. Clair, R.K.

    1994-01-01

    The 1990s promise to be a decade of change. In business, the focus will be on restructuring for purposes of improved productivity and efficiency. The Department of Energy (DOE) has recognized that change is on the horizon. The Yucca Mountain Project, carried out under the Office of Civilian Radioactive Waste Management (OCRWM) within the DOE is under new leadership. This new leadership is restructuring its operations to provide better focus, greater efficiency, meaningful products demonstrating progress and a more open operational environment. Criticisms of past operations have been reviewed and evaluated such that the new management organization derives benefit from the past. In recognition that management concerns may be manifested in other areas, Yucca Mountain Project management believes that reorganization is necessary to maximize efficiency. In designing the new organization, a high priority has been placed upon making changes which enable the federal leadership to exercise appropriate control and make participants more responsible and accountable for their work. Transition to the new organization will be implemented in four phases: (1) establishing the management construct, (2) defining roles and responsibilities of functional management, (3) development of the task performance teams, and (4) subsequent evolution of the open-quotes project teamclose quotes as a whole. A program-wide strategic plan is being prepared which includes a variety of revisions to the program of the past. This plan charts the path the Department will follow in fulfilling its mission. The vision of the new management developed by the DOE focuses on the creation of open-quotes teams,close quotes both a management team and task performance teams. The new management team will be tasked with implementing the plan

  18. Environmental aspects of contingency planning and spill response

    International Nuclear Information System (INIS)

    Hillman, S.O.

    1993-01-01

    Alyeska Pipeline Service Company has implemented an incident command system (ICS) for crisis management within the company for response to spills at all company facilities including the Valdez Marine Terminal. The system is also used by Alyeska acting as the initial response contractor for TAPS laden tankers within Prince William Sound. During the past three years, Alyeska has undertaken a complete review of the spill prevention and response plans for these areas. This poster session focuses on the environmental aspects of the response planning efforts. Information is available on contingency planning updates in the areas of dispersant use, burning as a response tool, bioremediation of marine oil spills, waste management, permitting, coastal resource and sensitive habitat data base, and wildlife protection and management. All of these subjects are addressed in the resource documents (RD) supplementing the contingency plans. The RD revisions have been a coordinated effort, involving operators, agencies, and the public through the citizen advisory group

  19. SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2005-05-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  20. SNL/CA Environmental Planning and Ecology Program Annual Report 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2007-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  1. Water management planning guideline for waterpower

    International Nuclear Information System (INIS)

    2002-05-01

    Hydroelectric power has been used in Ontario for over 150 years, providing the impetus to economic development in the province. Currently, 83 hydroelectric utilities own the more than 200 hydro power facilities in Ontario, accounting for approximately 26 per cent of the total electrical generating capacity in the province. Flood control and the creation of recreational opportunities were added benefits derived from the construction of hydroelectric dams. The three ways of operating hydroelectric facilities are: run-of-the-river which involves minimal forebay storage, peaking which involves the operation of the dam for specific periods of high energy demand, and intermediate. The Ontario government plans to open the electricity market to competition, guided by four principles: (1) protecting consumers and offering more choice, (2) ensuring a strong business climate with a reliable supply of electricity, (3) protecting the environment, and (4) encouraging new ways of doing business and new sources of power. To address issues that arise from the operation of hydroelectric facilities, dam owners and hydroelectric facilities operators are required to develop Water Management Plans, outlining how the facility will be operated to balance environmental, social and economic objectives. The present document was developed to define goals and principles concerning planning, the scope of Water Management Plans, the criteria and the general planning process to be adopted for the preparation of the Plans. 1 tab., 4 figs

  2. 76 FR 21877 - Environmental Management Advisory Board

    Science.gov (United States)

    2011-04-19

    ... DEPARTMENT OF ENERGY Environmental Management Advisory Board AGENCY: Department of Energy. ACTION: Notice of call for nominations for appointment to the Environmental Management Advisory Board. SUMMARY... Environmental Management Advisory Board. DATES: Nominations will be accepted through May 13, 2011. ADDRESSES...

  3. Resilience and environmental management

    Science.gov (United States)

    Environmental law plays a key role in shaping policy for sustainability. In particular, the types of legal instruments, institutions, and the response of law to the inherent variability in socio-ecological systems is critical. Sustainability likely must occur via the institutions...

  4. Hibernia's environmental planning: Past, present and future

    International Nuclear Information System (INIS)

    Grattan, L.

    1991-01-01

    The Hibernia oil project on the Grand Banks was assessed by the Federal Environmental Assessment and Review (FEARO) process, and the FEARO recommendations were used by the Canada-Newfoundland Offshore Petroleum Board to specify conditions of approval to proceed with the project. The construction site for the Hibernia offshore platform also underwent an environmental evaluation under the FEARO process. The Hibernia project partners are committed to implementing environmental protection plans for all phases of the project, and enforcement of the plans is the responsibility of the two major site contractors. An environmental effects monitoring program is in place at the construction site and the Hibernia partners are consulting closely with fishermen in the site area to develop an operational code of practice and a compensation policy

  5. New standard environmental management

    International Nuclear Information System (INIS)

    Andriola, Luca; Luciani, Roberto

    2006-01-01

    The ISO 14001:2004 standard, like ISO 9001:2000 on quality management, transcends the preventive approach (based on a rigid and more or less adequate process-management model still mainly inspired by traditional production methods) and introduces in its stead a highly flexible approach applicable to any socio-economic activity. It is structured by processes rather than system elements, and is based on the quest for efficacy and ongoing improvement [it

  6. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  7. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  8. Management strategies in hospitals: scenario planning

    Directory of Open Access Journals (Sweden)

    Ghanem, Mohamed

    2015-06-01

    Full Text Available Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  9. Sample management implementation plan: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Sample Management Implementation Plan is to define management controls and building requirements for handling materials collected during the site characterization of the Deaf Smith County, Texas, site. This work will be conducted for the US Department of Energy Salt Repository Project Office (SRPO). The plan provides for controls mandated by the US Nuclear Regulatory Commission and the US Environmental Protection Agency. Salt Repository Project (SRP) Sample Management will interface with program participants who request, collect, and test samples. SRP Sample Management will be responsible for the following: (1) preparing samples; (2) ensuring documentation control; (3) providing for uniform forms, labels, data formats, and transportation and storage requirements; and (4) identifying sample specifications to ensure sample quality. The SRP Sample Management Facility will be operated under a set of procedures that will impact numerous program participants. Requesters of samples will be responsible for definition of requirements in advance of collection. Sample requests for field activities will be approved by the SRPO, aided by an advisory group, the SRP Sample Allocation Committee. This document details the staffing, building, storage, and transportation requirements for establishing an SRP Sample Management Facility. Materials to be managed in the facility include rock core and rock discontinuities, soils, fluids, biota, air particulates, cultural artifacts, and crop and food stuffs. 39 refs., 3 figs., 11 tabs

  10. Investigation-Derived Waste Management Plan. Revision 2

    International Nuclear Information System (INIS)

    Molen, G.

    1995-01-01

    SRS has implemented a comprehensive environmental program to maintain compliance with environmental regulations and mitigate impacts to the environment. One element of the environmental program is the investigation of inactive waste units. Environmental Investigation-Derived Waste (IDW). IDW may include purge water , soil cuttings, drilling fluids, well pumping test and development water, decontamination solutions, contaminated equipment, and personal protection equipment (PPE). In cases where investigations confirm the presence of contamination and the IDW contains waste constituents in concentrations high enough to be of environmental or health concern, special management procedures are warranted. This IDW Management Plan describes specific SRS initiatives for IDW management. The goal is the development of a plan for prudent management of IDW from environmental investigations that is protective of human health and the environment

  11. The Aalborg Approach to Environmental Management

    DEFF Research Database (Denmark)

    Jamison, Andrew; Nielsen, Eskild Holm

    2002-01-01

    The Article Briefly Presents the Master Programme in Environmental Management at Aalborg University......The Article Briefly Presents the Master Programme in Environmental Management at Aalborg University...

  12. 2002 Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2002-01-01

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance

  13. Environmental impact assessment applied to planning activities

    International Nuclear Information System (INIS)

    Vismara, R.

    1994-01-01

    Object of EEC (European Economic Community) directive and italian law are certain public and private projects. However, more recent tendency are moving to an application on planning action too. There is no doubt that EIA (Environmental Impact Analysis) on project is very different than EIA on plans. Obviously EIA on a sectorial plan is not an addition of singular EIA on project. The new main objectives shall be: identification of critical areas; identification of interaction between different projects and between different factors; identification of critical project. A methodology to quantify these objectives in matricial form is presented

  14. Environmental management: A system approach

    Science.gov (United States)

    Petak, William J.

    1981-05-01

    This paper presents a system framework whose purpose is to improve understanding of environmental management. By analyzing the links between elements of the environmental management system, it is possible to construct a model that aids thinking systematically about the decision-making subsystem, and other subsystems, of the entire environmental management system. Through a multidisciplinary environmental approach, each of the individual subsystems is able to adapt to threats and opportunities. The fields of government, market economics, social responsibility and ecology, for example, are so complex that it is extremely difficult to develop a framework that gives full consideration to all aspects. This paper, through the application of a highly idealized system framework, attempts to show the general relationships that exist between complex system elements.

  15. Forest Resource Management Plans: A Sustainability Approach

    Science.gov (United States)

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  16. Environmental Accounting as a Tool for Environmental Management ...

    African Journals Online (AJOL)

    Environmental Accounting as a Tool for Environmental Management System. ... This paper reviews about the relationship of environmental accounting and environmental ... to legal and regulation requirement, to reduce cost from customer

  17. Green knowledge management to support environmental sustainability

    International Nuclear Information System (INIS)

    Dornhoefer, Mareike-Jessica

    2017-01-01

    Sustainability, environmental management and green initiatives are topics which gradually developed into trends since the late 1980s, not only in research institutions, but also in public and private organizations. While the usage of energy and other resources are increasing, these organizations search for new possibilities to reduce the economic, ecologic and social burdens and consequences of office and production environments for employees and nature. While certified environmental management systems were established already in the 1990s, green approaches and technologies are only about 10 years old and steadily developing. Decisions about a fitting strategy and the support of suitable measures inside an organization always require knowledge provided for the decision makers. Furthermore it is of importance to record the environmental consequences of the operational business and to not only record data and information, but to create a context and deduce the knowledge for future activities. Based on this situation, the work addresses the main research question of how �classical'' knowledge management might be further developed or transformed into Green Knowledge Management and how it addresses the goals of sustainability, especially ecological sustainability, environmental management and green approaches alike? The definition of Green Knowledge Management consists of five factors, which are discussed systematically, explored conceptually and documented with the help of practical examples. Different knowledge management models and their respective building blocks are analyzed to deduce how knowledge processes might interact with environmental ones as well as green aspects. Also different types of knowledge management systems are analysed for their application possibilities. A planning and decision making tool in form of a three dimensional cube, the ''Green Knowledge Management Cube'' is introduced on a conceptual level and documented

  18. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    OpenAIRE

    Tomescu Ada Mirela

    2012-01-01

    The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc). The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and p...

  19. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  20. Feed Materials Production Center Waste Management Plan

    International Nuclear Information System (INIS)

    Watts, R.E.; Allen, T.; Castle, S.A.; Hopper, J.P.; Oelrich, R.L.

    1986-01-01

    In the process of producing uranium metal products used in Department of Energy (DOE) defense programs at other DOE facilities, various types of wastes are generated at the Feed Materials Production Center (FMPC). Process wastes, both generated and stored, are discussed in the Waste Management Plan and include low-level radioactive waste (LLW), mixed hazardous/radioactive waste, and sanitary/industrial waste. Scrap metal waste and wastes requiring special remediation are also addressed in the Plan. The Waste Management Plan identifies the comprehensive programs developed to address safe storage and disposition of all wastes from past, present, and future operations at the FMPC. Waste streams discussed in this Plan are representative of the waste generated and waste types that concern worker and public health and safety. Budgets and schedules for implementation of waste disposition are also addressed. The waste streams receiving the largest amount of funding include LLW approved for shipment by DOE/ORO to the Nevada Test Site (NTS) (MgF 2 , slag leach filter cake, and neutralized raffinate); remedial action wastes (waste pits, K-65 silo waste); thorium; scrap metal (contaminated and noncontaminated ferrous and copper scrap); construction rubble and soil generated from decontamination and decommissioning of outdated facilities; and low-level wastes that will be handled through the Low-Level Waste Processing and Shipping System (LLWPSS). Waste Management milestones are also provided. The Waste Management Plan is divided into eight major sections: Introduction; Site Waste and Waste Generating Process; Strategy; Projects and Operations; Waste Stream Budgets; Milestones; Quality Assurance for Waste Management; and Environmental Monitoring Program

  1. General Plan Environmental Assessment, Hurlburt Field, Florida

    Science.gov (United States)

    2005-10-01

    sebiferum) and cogon grass (Imperata Resource/Issue Areas Hurlburt Field General Plan Environmental Assessment 4-9 cylindrica) are most...habitat on the western portion of the installation. The restoration of a native long-leaf pine/wire grass community on Hurlburt is associated with a

  2. Air quality management planning (AQMP

    Directory of Open Access Journals (Sweden)

    Sivertsen Bjarne

    2012-01-01

    Full Text Available In most urban areas of the world, particulate matter (PM levels pose severe problems, addressed in several policy areas (air quality, climate change, and human health. PM presents multiple challenges due to the multitude of its sources, spanning many sectors of economic activity as well as nature, and due to the complexity of atmospheric processes involved in its transport and secondary formation. For the authorities, the goal is to assure minimal impacts of atmospheric PM levels, in practice represented by compliance with existing regulations and standards. This may be achieved through an air quality management plan (AQMP. In Northern America and in parts of Europe, comprehensive research programs have guided development of AQMP over the last forty years. This cumulated experience can be utilized by others who face the same problems, but have yet to develop their own substantial research base. The main purpose of the AQMP development process is to establish an effective and sound basis for planning and management of air quality in a selected area. This type of planning will ensure that significant sources of impacts are identified and controlled in a most cost-effective manner. The choice of tools, methods and input information is often dictated by their availability, and should be evaluated against current best practices. Important elements of the AQMP are the identification of sources and development of a complete emission inventory, the development and operation of an air quality monitoring programme, and the development and application of atmospheric dispersion models. Major task is to collect the necessary input data. The development of the AQMP will take into account: - Air Quality Management System (AQMS requirements; - Operational and functional structure requirements; - Source identification through emission inventories; - Source reduction alternatives, which may be implemented; - Mechanisms for facilitating interdepartmental

  3. 77 FR 12495 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion of...

  4. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct... Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality Management District (SMAQMD...

  5. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Tomescu Ada Mirela

    2012-07-01

    Full Text Available The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc. The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and practices are not good in themselves but also integrate with all other environmental objectives, and with social and economic development objectives. The principles of sustainable development involve that environment management policies and practices. These are not sound in them-self but also integrate with all other environmental objectives, and with social and economic development objectives. Those objectives were realized, and followed by development of strategies to effects the objective of sustainable development. Environmental management should embrace recent change in the area of environmental protection, and suit the recently regulations of the field -entire legal and economic, as well as perform management systems to meet the requirements of the contemporary model for economic development. These changes are trailed by abandon the conventional approach of environmental protection and it is replaced by sustainable development (SD. The keys and the aims of Cleaner Productions (CP are presented being implemented in various companies as a non-formalised environmental management system (EMS. This concept is suggested here as a proper model for practice where possible environmental harmful technologies are used -e.g. Rosia Montana. Showing the features and the power of CP this paper is a signal oriented to involve the awareness of policy-makers and top management of diverse Romanian companies. Many companies in European countries are developing

  6. Environmental data management at Fernald

    International Nuclear Information System (INIS)

    Jones, B.W.; Williams, J.

    1994-01-01

    FERMCO supports DOE's ongoing initiatives for the continuous improvement of site restoration through the development and application of innovative technologies. A major thrust of FERMCO's efforts has been the enhancement of environmental data management technology for the site. The understanding of environmental data is the fundamental basis for determining the need for environmental restoration, developing and comparing remedial alternatives, and reaching a decision on how to clean up a site. Environmental data management at Fernald is being focused on two major objectives: to improve the efficiency of the data management process, and to provide a better understanding of the meaning of the data at the earliest possible time. Environmental data at Fernald is typically a soil or groundwater sample collected by one of the field geologists. These samples are then shipped to one or more laboratories for analysis. After the analyses are returned from the laboratories the data are reviewed and qualified for usability. The data are then used by environmental professionals for determining nature and extent of contamination. Additionally, hazardous waste materials whether generated during production or during cleanup, may be sampled to characterize the waste before shipment or treatment. The data management process, which uses four major software systems, is presented graphically

  7. Management of planned unit outages

    International Nuclear Information System (INIS)

    Brune, W.

    1984-01-01

    Management of planned unit outages at the Bruno Leuschner Nuclear Power Plant is based on the experience gained with Soviet PWR units of the WWER type over a period of more than 50 reactor-years. For PWR units, planned outages concentrate almost exclusively on annual refuellings and major maintenance of the power plant facilities involved. Planning of such major maintenance work is based on a standardized basic network plan and a catalogue of standardized maintenance and inspection measures. From these, an overall maintenance schedule of the unit and partial process plans of the individual main components are derived (manually or by computer) and, in the temporal integration of major maintenance at every unit, fixed starting times and durations are determined. More than 75% of the maintenance work at the Bruno Leuschner Nuclear Power Plant is carried out by the plant's own maintenance personnel. Large-scale maintenance of every unit is controlled by a special project head. He is assisted by commissioners, each of whom is responsible for his own respective item. A daily control report is made. The organizational centre is a central office which works in shifts around the clock. All maintenance orders and reports of completion pass through this office; thus, the overall maintenance schedule can be corrected daily. To enforce the proposed operational strategy, suitable accompanying technical measures are required with respect to effective facility monitoring and technical diagnosis, purposeful improvement of particularly sensitive components and an increase in the effectiveness of maintenance work by special technologies and devices. (author)

  8. Marine Spatial Planning: Norway´s management plans

    OpenAIRE

    Hoel, Alf Håkon; Olsen, Erik

    2010-01-01

    Since the adoption of a government white paper on ocean governance in 2001, Norway has worked on the development and implementation of marine spatial planning in the format of regional management plans. Management plans for the Barents Sea and the oceans off northern Norway and the Norwegian Sea were adopted in 2006 and 2009, respect...

  9. Risk Management Plan (RMP) Facility Points, Region 9, 2011, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Risk Management Plan (RMP): Under the Clean Air Act, Section 112(r), the EPA established a program requiring risk management plans to be provided to the EPA by...

  10. Risk Management Plan (RMP) Facility Points, Region 9, 2014, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Risk Management Plan (RMP): Under the Clean Air Act, Section 112(r), the EPA established a program requiring risk management plans to be provided to the EPA by...

  11. Environmental health research in Japan - management of environmental risks

    Energy Technology Data Exchange (ETDEWEB)

    Nakamura, Masahisa [Lake Biwa Research Institute (Japan)

    1997-12-31

    Briefly discussed the topics on emerging environmental health risks, their assessment and management, with special emphasis on groundwater management , environmental contamination, source protection, new drinking water and ambient water quality standards; and sophistication in instrumentation in environmental quality measurements, hazards and risk assessment and control, technology development in environmental health risk management.

  12. Environmental health research in Japan - management of environmental risks

    International Nuclear Information System (INIS)

    Masahisa Nakamura

    1996-01-01

    Briefly discussed the topics on emerging environmental health risks, their assessment and management, with special emphasis on groundwater management , environmental contamination, source protection, new drinking water and ambient water quality standards; and sophistication in instrumentation in environmental quality measurements, hazards and risk assessment and control, technology development in environmental health risk management

  13. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Sebastian Puente

    1998-07-25

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics.

  14. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    International Nuclear Information System (INIS)

    Sebastian Puente

    1998-01-01

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics

  15. Environmental surveillance: An integral part of the spill contingency plan

    International Nuclear Information System (INIS)

    Salinas, J.; Bozzo, W.

    1993-01-01

    Typically, the initial response to spills is directed at containing, controlling, and stopping the flow of spilled materials. The primary goal of such a response is to limit the spread and further impact of spilled material, and to initiate timely cleanup and recovery of affected areas. Surveillance of actual spill impacts has often followed an after the fact approach, using only immediately available resources. Surveillance may occur quickly after a spill, but in most incidents its occurs as a follow-up action after initial response and containment have been achieved. Insufficient planning may produce spill surveillance that inadequately assesses impacts, fails to incorporate baseline data, and does not clearly identify a cleanup recovery and endpoint. The management and operations contractor for the US Dept. of Energy's Strategic Petroleum Reserve (SPR) conducts environmental surveillance activities in response to spill incidents when they occur at these facilities. These surveillance activities, when conducted as part of the response, are useful instruments in the initial assessment of spill incidents, management of spill response, containment, and cleanup activities, and for monitoring and documenting postspill impacts and recovery. An Environmental Surveillance Plan (ESP) incorporated in the SPR Spill Contingency Plan provides for initiation of environmental surveillance as part of the spill response. The ESP outlines, through alogic tree, conditions for activating the plan, key indicator parameters for evaluation, detailed methods for establishing surveillance stations, lists of key personnel, locations of equipment necessary to perform surveillance, and conditions for termination of environmental surveillance

  16. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  17. Management Cycle: from Planning to Evaluation

    OpenAIRE

    Kova?i?, Luka; Jakši?, Želimir

    2008-01-01

    The planning process in health care known as management cycle or cycle of organization and management is described. The cycle is divided in four main elements: planning, organization, implementation and evaluation. Each element is defined and described.

  18. The 2000 DOD Financial Management Improvement Plan

    National Research Council Canada - National Science Library

    2001-01-01

    .... As a result, DoD has prepared the Financial Management Improvement Plan (the Plan), which is a strategic framework that includes the Departments financial management concept of operations for the future...

  19. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden about the plans for the final disposal of the radioactive waste products of the nuclear power. Part 1 describes the general background, the plans for research and development, including the necessary facilities. The time schedule and the calculated costs of the operations are presented. (G.B.)

  20. Master environmental plan for Fort Devens, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Biang, C.A.; Peters, R.W.; Pearl, R.H.; Tsai, S.Y. (Argonne National Lab., IL (United States). Energy Systems Div.)

    1991-11-01

    Argonne National Laboratory has prepared a master environmental plan (MEP) for Fort Devens, Massachusetts, for the US Army Toxic and Hazardous Materials Agency. The MEP is an assessment based on environmental laws and regulations of both the federal government and the Commonwealth of Massachusetts. The MEP assess the physical and environmental status of 58 potential hazardous waste sites, including 54 study areas (SAs) that pose a potential for releasing contamination into the environment and 4 areas of concern (AOCs) that are known to have substantial contamination. For each SA or AOC, this MEP describes the known history and environment, identifies additional data needs, and proposes possible response actions. Most recommended response actions consist of environmental sampling and monitoring and other characterization studies. 74 refs., 63 figs., 50 tabs.

  1. Environmental Management Science Program Workshop

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-07-01

    This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.

  2. Radiological protection and environmental management

    International Nuclear Information System (INIS)

    Perez Fonseca, A.

    2010-01-01

    From the beginning of its industrial activity twenty five years ago, the Juzbado Factory of Enusa Group has always upheld a strong commitment with Radiological Protection and environmental respect and protection. Consequently, the evolution of dose shows a downward trend over the years. Although production has been increased gradually, the average doses to workers have stayed below 1 mSv. In order to identify and prevent the potential environmental impacts of its industrial activity and minimize its impact on the surroundings, the facility develops and environmental management system according to UNE-EN-ISO 14001 since 1999. (Author)

  3. Environmental management in product chains

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Forman, Marianne; Hansen, Anne Grethe

    of environmental initiatives, a number of recommendations for governmental regulation, which can support the further diffusion of environmental management in product chains, are developed. Furthermore, the report describes a number of theoretical perspectives from sociology of technology, organisation theory......This report presents the analyses of the shaping, implementation and embedding of eight types of environmental initiatives in product chains. The analyses focus on • the role of the type of product and branch, of the size of the companies and of governmental regulation • the focus...... of the environmental concerns and the reductions in environmental impact • organisational changes which have been part of the embedding of the initiatives The analyses are based on 25 cases from national and international product chains involving one or more Danish companies. Based on the analyses of the eight types...

  4. Environmental Aspects of Load Management

    International Nuclear Information System (INIS)

    Abaravicius, Juozas

    2004-02-01

    This study approaches load management from an environmental perspective. It identifies and discusses the possible environmental benefits of load management and evaluates their significance, primary focusing on CO 2 emissions reduction. The analysis is carried out on two levels: national - the Swedish electricity market, and local - one electric utility in southern Sweden. Our results show the importance of considering the influence of site-specific or level-specific conditions on the environmental effects of load management. On the national level, load management measures can hardly provide significant environmental benefits, due to the high hydropower production in Sweden, which is the demand following production source. Emission reductions will rather be the result of energy efficiency measures, which will cut the load demand as well as the energy demand. However, when it comes to a local (utility) level, where load management is considered as an alternative to an installation of peak diesel power plant, the benefits are clear. It is demonstrated that significant CO 2 emissions savings can be achieved due to avoided peak diesel power production

  5. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  6. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  7. Integrating fire management analysis into land management planning

    Science.gov (United States)

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  8. The relationship between the Municipal Master Plan and local Watershed Plans in water management

    Directory of Open Access Journals (Sweden)

    Denise Gallo Pizella

    2015-07-01

    Full Text Available The National Water Resources Policy has as one of its tools the drafting of local Water Resource Plans. In view of water resources planning and its relationship to land use planning, the aim of this work is to analyze the institutional and legal difficulties and the potential for an integrated system of water resources management. For this, we used the method of documentary and bibliographic research, beginning with the “Estatuto da Cidade”, a law for urban policy in Brazil, and literature on water management at the municipal and watershed levels. At the municipal level, the “Master Plan” (municipal plan of land use planning became the main instrument of territorial and municipal management, defining the parameters for the compliance of social, environmental and economic functions of real property. In this sense, the municipalities have a responsibility to protect water resources and, without local support, territorial and water management cannot be integrated in the context of the river basin. Despite the difficulties of including environmental variable in urban planning, the Master Plan has the potential to shape local water management systems that are environmentally sustainable and that progressively improve water quality and quantity within the watershed. Similarly, with more significant participation of the municipality in the Basin Committee, it is possible that the forms of municipal land use and occupation can be considered during the development and implementation of the Basin Plan. Thus, the management of water resources can occur integrally.

  9. Environmental Development Plan (EDP). Enhanced gas recovery, FY 1977

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-01

    This Enhanced Gcs Recovery EDP addresses the environmental impacts of enhanced gas recovery processes in shale and sandstone, methane drainage from coalbeds, and methane recovery from geopressured aquifers. The EDP addresses planning in two basic areas: environmental research and environmental assessment. Environmental research can be categorized as follows: characterization of pollutants from EGR processes; selective application of monitoring and measuring techniques; evaluation of control/mitigation techniques; and evaluation of the synergistic impacts of the development of EGR techniques. Environmental assessment activities scheduled by EDP include: assessment of ecological impacts; assessment of socioeconomic effects; EIA/EIS preparation; evaluation of control technology needs; and analysis of applicable and proposed emission, effluent, and health and safety standards. The EGR EDP includes an EGR technology overview (Section 2), a discussion of EGR environmental issues and requirements (Section 3), an environmental action plan (Section 4), an environmental management strategy for the EGR program (Section 5), and supporting appendices which present information on Federal legislation applicable to EGR technology, a summary of ongoing and completed research, and future research and assessment projects.

  10. 7 CFR 650.5 - Environmental evaluation in planning.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Environmental evaluation in planning. 650.5 Section...-Assisted Programs § 650.5 Environmental evaluation in planning. (a) General. Environmental evaluation (EE) integrates environmental concerns throughout the planning, installation, and operation of NRCS-assisted...

  11. Planning and Nuclear Knowledge Management

    International Nuclear Information System (INIS)

    Grance Torales, V.L.; Lira, L.

    2016-01-01

    Full text: The present case aims to share the experience of the Intellectual Capital Section (ICS), part of Planning, Coordination and Control Department of the Argentine Atomic Energy Commission (CNEA) in its search for a sustainable knowledge management. Among the strategic objectives included in CNEA’s Strategic Plan (SP), is the development, preservation and transference of knowledge and experience. Under this framework, the role initially assumed by the ICS, consisted on the observation and diagnosis of the situation of the Institutional Human Capital (HC), through the study of the main characteristics of the staff of CNEA. The second stage of SP (2015–2025), which consisted of updating the HC data, the incorporation of the concept of “knowledge management” was approved by the authorities of the Institution. Based on this background, in 2016 the objectives of the ICS are aimed at organizing and coordinating a network of knowledge management that involves the entire organization. This new phase implies, among other things, the proposal of a knowledge management policy, interaction with other sectors of CNEA for implementation, analysis of the tools to be used, in order to determine a way and work style that suits the culture and structure of the organization. (author

  12. Liquidity management through financial planning

    Directory of Open Access Journals (Sweden)

    Kameníková Katarína

    2001-12-01

    Full Text Available One of the basic goals of financial management is to provide financial property and capital for running of the firm, as well as for its development, that means provide optimal firm´s liquidity.To improve liquidity is possible provide through various ways. In present time there is increasing importance of financial planning., where planning of liquidity presents one of its integral part. Therefore I deal in presented paper with possible liquidity improvement through calculation of financial planning in chosen slovac magnesite firm, exploitating and elaborating magnesite raw material.For creating of financial plann of liquidity I chosed to use one of the practical methods - method of financial indexes. Such method presents process of planning optimal liquidity with providing of required rentability. Such plann must provide balance between income and outcome, as well as secure achievment of expected profit.I used tools of financial planning for calculation of possible liquidity improvement in mentioned firm, where present financial situation is characterised by law liquidity, but high rentability. Such position presents transitive crisis situation, therefore firm must create new financial property or decrease liabilities, in order to overcome negative state of liquidity.Performed calculation showed, that change in balance sheet due to the growth of financial property will improve liquidity, rentability will be maintained, therefore firm will be able to transit from crisis situation.Providing of liquidity will present one of possible way how to care for financial health of firm. But such process is not simple, it must be done with connection to the changes of internal and external conditions of the firm.

  13. Y-12 Site environmental protection program implementation plan (EPPIP)

    International Nuclear Information System (INIS)

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually

  14. Y-12 Site environmental protection program implementation plan (EPPIP)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

  15. Tunnel Vision in Environmental Management.

    Science.gov (United States)

    Miller, Alan

    1982-01-01

    Discusses problem-solving styles in environmental management and the specific deficiencies in these styles that might be grouped under the label "tunnel vision," a form of selective attention contributing to inadequate problem-formulation, partial solutions to complex problems, and generation of additional problems. Includes educational…

  16. Interactions management in environmental policy

    NARCIS (Netherlands)

    Krozer, Yoram; Franco Garcia, Maria Maria; Micallef, David

    2013-01-01

    Purpose: The paper aims to address regulator-management interactions in environmental policy with reference to direct regulations, social regulations and market-based regulation. Design/methodology/approach: Revision of literature to identify the European Union regulations for companies producing

  17. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  18. Environmental education for river-basin planning

    Energy Technology Data Exchange (ETDEWEB)

    Saha, S K

    1980-08-01

    Harmonious intervention in land use, a result of environmental education and good planning, can increase the social and economic benefits without precluding development. Modern river basin planning began as a US innovation in 1874 over the subject of water regulation in the west. The Tennessee Valley Authority (TVA) was devised as a state tool for comprehensive river basin planning and development. The TVA example was not repeated in the other 10 US basins by the Corps of Engineers and the Bureau of Reclamation, although the concept of unified development has survived as a three-part relationship of physical,biological, and human forces in which any malfunctioning of one subsystem affects the others. This is evident in problems of water transfer from agricultural to industrial functions and changes to drainage patterns. The potential damage from ignoring these relationships can be avoided with true interdisciplinary communications. 24 references, 2 tables. (DCK)

  19. Environmental dredging residual generation and management.

    Science.gov (United States)

    Patmont, Clay; LaRosa, Paul; Narayanan, Raghav; Forrest, Casey

    2018-05-01

    The presence and magnitude of sediment contamination remaining in a completed dredge area can often dictate the success of an environmental dredging project. The need to better understand and manage this remaining contamination, referred to as "postdredging residuals," has increasingly been recognized by practitioners and investigators. Based on recent dredging projects with robust characterization programs, it is now understood that the residual contamination layer in the postdredging sediment comprises a mixture of contaminated sediments that originate from throughout the dredge cut. This mixture of contaminated sediments initially exhibits fluid mud properties that can contribute to sediment transport and contamination risk outside of the dredge area. This article reviews robust dredging residual evaluations recently performed in the United States and Canada, including the Hudson River, Lower Fox River, Ashtabula River, and Esquimalt Harbour, along with other projects. These data better inform the understanding of residuals generation, leading to improved models of dredging residual formation to inform remedy evaluation, selection, design, and implementation. Data from these projects confirm that the magnitude of dredging residuals is largely determined by site conditions, primarily in situ sediment fluidity or liquidity as measured by dry bulk density. While the generation of dredging residuals cannot be avoided, residuals can be successfully and efficiently managed through careful development and implementation of site-specific management plans. Integr Environ Assess Manag 2018;14:335-343. © 2018 The Authors. Integrated Environmental Assessment and Management Published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2018 The Authors. Integrated Environmental Assessment and Management Published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).

  20. Environmental management of business processes

    Directory of Open Access Journals (Sweden)

    Vesna Čančer

    2000-01-01

    Full Text Available Since the decision-makers in enterprises will accept the goals of environmental management only if they are motivated enough, comprehensible and useful tools should be generated to support environmentally oriented business decision-making. For that reason, a general optimisation model of the multiphase business process is presented in this paper. This model includes the possibilities for an integrated approach to environmental protection so that it can be applied as a scenario by the business process simulation for the evaluation of environmentally oriented business decisions on business performance. Furthermore, development and application possibilities of the presented model are introduced. Some measures of resource efficiency are developed using the presented optimisation model.

  1. Conference on Environmental Data Management

    CERN Document Server

    Oppenheimer, Dorothy; Brogden, William; Environmental Data Management

    1976-01-01

    Throughout the world a staggering amount of resources have been used to obtain billions of environmental data points. Some, such as meteorological data, have been organized for weather map display where many thousands of data points are synthesized in one compressed map. Most environmental data, however, are still widely scattered and generally not used for a systems approach, but only for the purpose for which they were originally taken. These data are contained in relatively small computer programs, research files, government and industrial reports, etc. This Conference was called to bring together some of the world's leaders from research centers and government agencies, and others concerned with environmental data management. The purpose of the Conference was to organize discussion on the scope of world environmental data, its present form and documentation, and whether a systematic approach to a total system is feasible now or in the future. This same subject permeated indirectly the Stockholm Conference...

  2. Environmental Development Plan (EDP): space applications

    International Nuclear Information System (INIS)

    1978-04-01

    This Environmental Development Plan (EDP) identifies and examines the environmental, safety, health, and socioeconomic (ES and H) issues associated with the ongoing DOE Space Applications Program and the associated research, development, and demonstration programs. The EDP presents an ES and H research and development (R/D) program and strategy for timely resolutions of the issues and satisfaction of the associated requirements necessary for precluding impediments to the space nuclear systems technology. The EDP has been limited to the consideration of: (1) space nuclear power system nuclear fuel fabrication; (2) space nuclear power system heat source fabrication; (3) testing of subsystems and assembled systems; (4) R and D in support of space nuclear system development; (5) nuclear system responses to launch and reentry accidents; and (6) nuclear system environmental behavior and recovery

  3. Overview of the Hanford risk management plan

    International Nuclear Information System (INIS)

    Halverson, T.G.

    1998-01-01

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context

  4. Assessment of LANL waste management site plan

    International Nuclear Information System (INIS)

    Black, R.L.; Davis, K.D.; Hoevemeyer, S.S.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to present findings from evaluating the Los Alamos National Laboratory (LANL) Waste Management Plan to determine if it meets applicable DOE requirements. DOE Order 5820.2A, Radioactive Waste Management, sets forth requirements and guidelines for the establishment of a Waste Management Plan. The primary purpose of a Waste Management Plan is to describe how waste operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming year

  5. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden concerning the plans for the final disposal of the radioactive waste products of the nuclear power. Part 2 describes the waste facilities in details. The layouts and estimated costs are presented. The decomissioning of nuclear power plants and the postponement of it is discussed. (G.B.)

  6. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  7. Quality Assurance Program Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1992-01-01

    The United States Department of Energy (USDOE) has initiated the Environmental Restoration Program (ERP) in an effort to manage, control and remediate existing hazardous, toxic and radioactive wastes generated at the Portsmouth Gaseous Diffusion Plant (PORTS). This ERP Quality Assurance Program Plan (QAPP) is responsive to the PORTS ESH Division QAPP and the ES Environmental Restoration Division (ERD) QAPP. This QAPP establishes the policies, requirements and responsibilities by which an appropriate level of QA shall be implemented within the PORTS-ERP. All PORTS-ERP activities shall be conducted in accordance with the requirements of this document and/or of a project level document which is derivative of this document

  8. Management strategies in hospitals: scenario planning.

    Science.gov (United States)

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a "Stakeholder Feedback". Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and "blind spots". This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  9. Analysis of DOE international environmental management activities

    Energy Technology Data Exchange (ETDEWEB)

    Ragaini, R.C.

    1995-09-01

    The Department of Energy`s (DOE) Strategic Plan (April 1994) states that DOE`s long-term vision includes world leadership in environmental restoration and waste management activities. The activities of the DOE Office of Environmental Management (EM) can play a key role in DOE`s goals of maintaining U.S. global competitiveness and ensuring the continuation of a world class science and technology community. DOE`s interest in attaining these goals stems partly from its participation in organizations like the Trade Policy Coordinating Committee (TPCC), with its National Environmental Export Promotion Strategy, which seeks to strengthen U.S. competitiveness and the building of public-private partnerships as part of U.S. industrial policy. The International Interactions Field Office task will build a communication network which will facilitate the efficient and effective communication between DOE Headquarters, Field Offices, and contractors. Under this network, Headquarters will provide the Field Offices with information on the Administration`s policies and activities (such as the DOE Strategic Plan), interagency activities, as well as relevant information from other field offices. Lawrence Livermore National Laboratory (LLNL) will, in turn, provide Headquarters with information on various international activities which, when appropriate, will be included in reports to groups like the TPCC and the EM Focus Areas. This task provides for the collection, review, and analysis of information on the more significant international environmental restoration and waste management initiatives and activities which have been used or are being considered at LLNL. Information gathering will focus on efforts and accomplishments in meeting the challenges of providing timely and cost effective cleanup of its environmentally damaged sites and facilities, especially through international technical exchanges and/or the implementation of foreign-development technologies.

  10. Social, economic and environmental evaluation of agri-environmental beneficial management practices

    OpenAIRE

    Kitchen, Amy Elizabeth

    2012-01-01

    In British Columbia, the Canada-British Columbia Environmental Farm Plan Beneficial Management Practices Program (BMP Program) encourages the adoption of agri-environmental practices on farms. The BMP Program is a voluntary and confidential program, which is jointly funded by the BC Ministry of Agriculture and Agriculture and Agri-Food Canada. Since 2005 the BMP Program has provided funding to farmers to adopt agri-environmental Beneficial Management Practices (BMPs) and during this time no e...

  11. BNL ENVIRONMENTAL MONITORING PLAN TRIENNIAL UPDATE, JANUARY 2003.

    Energy Technology Data Exchange (ETDEWEB)

    BROOKHAVEN NATIONAL LABORATORY

    2003-01-01

    Brookhaven National Laboratory (BNL) is a multi-program national laboratory operated by Brookhaven Science Associates for the U.S. Department of Energy (DOE) and is located on a 5,265-acre site in Suffolk County, Long Island, New York. BNL has a comprehensive Environmental Management System (EMS) in place, which meets the requirements of the International Organization for Standardization 14001 EMS Standard, as described in the BNL EMS Manual. BNL's extensive environmental monitoring program is one component of the EMS, and the BNL Environmental Monitoring Plan (EMP) describes this program in detail. The data derived from systematically monitoring the various environmental media on site enable BNL to make informed decisions concerning the protection of human health and the environment and to be responsive to community concerns.

  12. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Butte County Air Quality Management...

  13. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District...

  14. Integrating energy and environmental management in wood furniture industry.

    Science.gov (United States)

    Gordić, Dušan; Babić, Milun; Jelić, Dubravka; Konćalović, Davor; Vukašinović, Vladimir

    2014-01-01

    As energy costs continue to rise, industrial plants (even those of energy nonintensive industries such as furniture industry) need effective way to reduce the amount of energy they consume. Besides, there are a number of economic and environmental reasons why a company should consider environmental management initiatives. This paper provides a detailed guideline for implementing joint energy and environmental management system in wood furniture industrial company. It covers in detail all essential aspects of the system: initial system assessment, organization, policy development, energy and environmental auditing, action plan development, system promotion, checking system performance, and management review.

  15. Integrating Energy and Environmental Management in Wood Furniture Industry

    Science.gov (United States)

    Babić, Milun; Jelić, Dubravka; Konćalović, Davor; Vukašinović, Vladimir

    2014-01-01

    As energy costs continue to rise, industrial plants (even those of energy nonintensive industries such as furniture industry) need effective way to reduce the amount of energy they consume. Besides, there are a number of economic and environmental reasons why a company should consider environmental management initiatives. This paper provides a detailed guideline for implementing joint energy and environmental management system in wood furniture industrial company. It covers in detail all essential aspects of the system: initial system assessment, organization, policy development, energy and environmental auditing, action plan development, system promotion, checking system performance, and management review. PMID:24587734

  16. Environmental management as situated practice

    DEFF Research Database (Denmark)

    Lippert, Ingmar; Krause, Franz; Hartmann, Niklas Klaus

    2015-01-01

    We propose an analysis of environmental management (EM) as work and as practical activity. This approach enables empirical studies of the diverse ways in which professionals, scientists, NGO staffers, and activists achieve the partial manageability of specific “environments”. In this introduction......, we sketch the debates in Human Geography, Management Studies, and Science and Technology Studies to which this special issue contributes. We identify the limits of understanding EM though the framework of ecological modernisation, and show how political ecology and work-place studies provide...... to be assessed, or as simply the implementation of dominant projects and the materialisation of hegemonic discourse. Such a shift renders EM as always messy practices of engagement, critique and improvisation. We conclude that studying the distributed and situated managing agencies, actors and their practices...

  17. Hanford Site Environmental Restoration Program 1994 fiscal year work plan

    International Nuclear Information System (INIS)

    1993-01-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Disposal Facilities (DF)

  18. Coupling Satellite Data with Species Distribution and Connectivity Models as a Tool for Environmental Management and Planning in Matrix-Sensitive Species

    Science.gov (United States)

    Rödder, Dennis; Nekum, Sven; Cord, Anna F.; Engler, Jan O.

    2016-07-01

    Climate change and anthropogenic habitat fragmentation are considered major threats for global biodiversity. As a direct consequence, connectivity is increasingly disrupted in many species, which might have serious consequences that could ultimately lead to the extinction of populations. Although a large number of reserves and conservation sites are designated and protected by law, potential habitats acting as inter-population connectivity corridors are, however, mostly ignored in the common practice of environmental planning. In most cases, this is mainly caused by a lack of quantitative measures of functional connectivity available for the planning process. In this study, we highlight the use of fine-scale potential connectivity models (PCMs) derived from multispectral satellite data for the quantification of spatially explicit habitat corridors for matrix-sensitive species of conservation concern. This framework couples a species distribution model with a connectivity model in a two-step framework, where suitability maps from step 1 are transformed into maps of landscape resistance in step 2 filtered by fragmentation thresholds. We illustrate the approach using the sand lizard ( Lacerta agilis L.) in the metropolitan area of Cologne, Germany, as a case study. Our model proved to be well suited to identify connected as well as completely isolated populations within the study area. Furthermore, due to its fine resolution, the PCM was also able to detect small linear structures known to be important for sand lizards' inter-population connectivity such as railroad embankments. We discuss the applicability and possible implementation of PCMs to overcome shortcomings in the common practice of environmental impact assessments.

  19. Technical assistance contractor Management Plan

    International Nuclear Information System (INIS)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins ampersand Beckwith Agra, Inc. (SHB Agra), and Geraghty ampersand Miller, Inc. (G ampersand M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC's groundwater technical breadth and depth, so G ampersand M was brought in to augment the team's capabilities. The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC's management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls

  20. 10 CFR 1.41 - Office of Federal and State Materials and Environmental Management Programs.

    Science.gov (United States)

    2010-01-01

    ... Environmental Management Programs. (a) The Office of Federal and State Materials and Environmental Management...) The Office of Federal and State Materials and Environmental Management Programs— (1) Plans and directs... 10 Energy 1 2010-01-01 2010-01-01 false Office of Federal and State Materials and Environmental...