WorldWideScience

Sample records for environmental management planning

  1. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  2. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  3. Comprehensive Environmental Management Plan

    International Nuclear Information System (INIS)

    Hjeresen, D.L.

    1994-01-01

    The Environmental Management Program at Los Alamos National Laboratory is in the process of initiating and then implementing a Comprehensive Environmental Management Plan (CEMP). There are several environmental impact and compliance drivers for this initiative. The Los Alamos CEMP is intended to be a flexible, long-range process that predicts, minimizes, treats, and disposes of any waste generated in execution of the Los Alamos mission - even if that mission changes. The CEMP is also intended to improve stakeholder and private sector involvement and access to environmental information. The total quality environmental management (TQEM) process will benchmark Los Alamos to private sector and DOE operations, identify opportunities for improvement, prioritize among opportunities, implement projects, measure progress, and spur continuous improvement in Environmental Management operations

  4. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  5. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  6. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  7. Guide to Developing an Environmental Management System - Plan

    Science.gov (United States)

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  8. MDOT Materials Laboratories : Environmental Management Plan

    Science.gov (United States)

    2012-06-01

    The goal of this EMP was to develop and implement a comprehensive Environmental : Management Plan for MDOT Materials Laboratories. This goal was achieved through : perfonnance of environmental audits to identify potential environmental impacts, and b...

  9. Hanford Environmental Information System Configuration Management Plan

    International Nuclear Information System (INIS)

    1996-06-01

    The Hanford Environmental Information System (HEIS) Configuration Management Plan establishes the software and data configuration control requirements for the HEIS and project-related databases maintained within the Environmental Restoration Contractor's data management department

  10. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a... plans, general environmental studies, and strategies and action programs to implement plans, including...

  11. Environmental planning and management of urban natural landscapes

    Directory of Open Access Journals (Sweden)

    A.R. Sadeghi

    2016-07-01

    Full Text Available Advantages of urbanization such as access to clean water, health, and overall easier life in cities, as well as the disadvantages or its negative effects on environment cannot be ignored. Today, there are numerous environmental problems due to the reduction in ecologically valuable places within urban areas. Bringing nature to the cities appears to be essential to enhance urban environment and to reduce environmental problems in urban communities. In fact, issues resulting from the idea of "sustainability" as a policy-making goal require an integrated environmental policy-making approach. The innovations of new environmental policy-making require policy-making mechanisms that can deal with interdependent characteristics of environmental problems. To this end, new structures have emerged known as Environmental Planning and Management and Strategic Environmental planning and management. This analytical – descriptive article aims to re-examine the origins and concepts related to environmental planning using a field and desk study. With the introduction of urban natural landscape, Environmental planning considers such spaces within the city. In this regard, Khoshk River, Shiraz, Iran, as an urban natural landscape, was analyzed. Environmental planning-based polices were proposed to improve quality of the place under discussion.

  12. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  13. Presentation of Coastal Environmental Management Plan by using ...

    African Journals Online (AJOL)

    MICHAEL HORSFALL

    ABSTRACT: The provision of environment management plan and ... environmental management plan of the eastern coasts of Mazandaran Province. ..... REFERENCE ... Department of oceanography, texas A&M university. An online textbook.

  14. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 570.205 Section 570.205..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning... known or suspected environmental contamination. (5) [Reserved] (6) Policy—planning—management—capacity...

  15. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Science.gov (United States)

    2010-11-24

    ... management under alternative B would be to enable visitor participation in a wide variety of outdoor... DEPARTMENT OF THE INTERIOR National Park Service [2031-A046-409] General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental Impact Statement, Big Cypress National...

  16. Discussion on teaching reform of environmental planning and management

    Science.gov (United States)

    Zhang, Qiugen; Chen, Suhua; Xie, Yu; Wei, Li'an; Ding, Yuan

    2018-05-01

    The curriculum of environmental planning and management is an environmental engineering major curriculum established by the teaching steering committee of environmental science and engineering of Education Ministry, which is the core curriculum of Chinese engineering education professional certification. It plays an important role in cultivating environmental planning and environmental management ability of environmental engineering major. The selection and optimization of the course teaching content of environmental planning and management were discussed which including curriculum teaching content updating and optimizing and teaching resource system construction. The comprehensive application of teaching method was discussed which including teaching method synthesis and teaching method. The final combination of the assessment method was also discussed which including the formative assessment normal grades and the final result of the course examination. Through the curriculum comprehensive teaching reform, students' knowledge had been broadened, the subject status and autonomy of learning had been enhanced, students' learning interest had been motivated, the ability of students' finding, analyzing and solving problems had been improved. Students' innovative ability and positive spirit had been well cultivated.

  17. Environmental development plan. LWR commercial waste management

    International Nuclear Information System (INIS)

    1980-08-01

    This Environmental Development Plan (EDP) identifies the planning and managerial requirements and schedules needed to evaluate and assess the environmental, health and safety (EH and S) aspects of the Commercial Waste Management Program (CWM). Environment is defined in its broadest sense to include environmental, health (occupational and public), safety, socioeconomic, legal and institutional aspects. This plan addresses certain present and potential Federal responsibilities for the storage, treatment, transfer and disposal of radioactive waste materials produced by the nuclear power industry. The handling and disposal of LWR spent fuel and processed high-level waste (in the event reprocessing occurs) are included in this plan. Defense waste management activities, which are addressed in detail in a separate EDP, are considered only to the extent that such activities are common to the commercial waste management program. This EDP addresses three principal elements associated with the disposal of radioactive waste materials from the commercial nuclear power industry, namely Terminal Isolation Research and Development, Spent Fuel Storage and Waste Treatment Technology. The major specific concerns and requirements addressed are assurance that (1) radioactivity will be contained during waste transport, interim storage or while the waste is considered as retrievable from a repository facility, (2) the interim storage facilities will adequately isolate the radioactive material from the biosphere, (3) the terminal isolation facility will isolate the wastes from the biosphere over a time period allowing the radioactivity to decay to innocuous levels, (4) the terminal isolation mode for the waste will abbreviate the need for surveillance and institutional control by future generations, and (5) the public will accept the basic waste management strategy and geographical sites when needed

  18. Strategic plan for Hanford Site Environmental Restoration Information Management

    International Nuclear Information System (INIS)

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site's soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site's production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user's needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach

  19. ORNL long-range environmental and waste management plan

    International Nuclear Information System (INIS)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs

  20. ORNL long-range environmental and waste management plan

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

  1. Environmental restoration and waste management site-specific plan for Richland Operations Office

    International Nuclear Information System (INIS)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs

  2. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  3. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Science.gov (United States)

    2010-07-01

    ... compliance, waste minimization, risk reduction and continual improvement of the environmental management... its compliance with the Environmental Management Plan and applicable federal and state hazardous waste... laboratory environmental management plan? 262.105 Section 262.105 Protection of Environment ENVIRONMENTAL...

  4. 78 FR 37846 - Resource Management Plan/General Plan and Environmental Impact Statement/Environmental Impact...

    Science.gov (United States)

    2013-06-24

    ...The Bureau of Reclamation and the California Department of Parks and Recreation (CDPR) have prepared a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Luis Reservoir State Recreation Area Resource Management Plan/General Plan (RMP/GP). The Final EIS/EIR describes and presents the environmental effects of the No Action/No Project Alternative and three Action Alternatives for implementing the RMP/GP. A Notice of Availability of the Draft EIS/EIR was published in the Federal Register on August 3, 2012 (77 FR 46518). The comment period on the Draft EIS/EIR ended on October 2, 2012. The Final EIS/EIR contains responses to all comments received and reflects comments and any additional information received during the review period.

  5. Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.

  6. Presentation of Coastal Environmental Management Plan by using ...

    African Journals Online (AJOL)

    The provision of environment management plan and formulating the environmental strategies of coastal regions are the most essential measures required for the integrated management of coastal regions. For this purpose, this research has been conducted using two goal-oriented and problem-oriented approaches in ...

  7. 36 CFR 223.218 - Consistency with plans, environmental standards, and other management requirements.

    Science.gov (United States)

    2010-07-01

    ..., environmental standards, and other management requirements. 223.218 Section 223.218 Parks, Forests, and Public... Special Forest Products § 223.218 Consistency with plans, environmental standards, and other management... with applicable land management plans. Each contract, permit, or other authorizing instrument shall...

  8. Environmental restoration and remediation technical data management plan

    International Nuclear Information System (INIS)

    Key, K.T.; Fox, R.D.

    1994-02-01

    The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit

  9. Quality Management Plan for the Environmental Assessment and Innovation Division

    Science.gov (United States)

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  10. 76 FR 3652 - Dog Management Plan/Environmental Impact Statement, Golden Gate National Recreation Area, California

    Science.gov (United States)

    2011-01-20

    ... DEPARTMENT OF THE INTERIOR National Park Service [8145-8B90-SZM] Dog Management Plan/Environmental...: Notice of Availability of a Draft Environmental Impact Statement for the Dog Management Plan, Golden Gate... the Dog Management Plan (Draft Plan/EIS), Golden Gate National Recreation Area (GGNRA), California...

  11. Hanford Site waste management and environmental restoration integration plan

    International Nuclear Information System (INIS)

    Merrick, D.L.

    1990-01-01

    The ''Hanford Site Waste Management and Environmental Restoration Integration Plan'' describes major actions leading to waste disposal and site remediation. The primary purpose of this document is to provide a management tool for use by executives who need to quickly comprehend the waste management and environmental restoration programs. The Waste Management and Environmental Restoration Programs have been divided into missions. Waste Management consists of five missions: double-shell tank (DST) wastes; single-shell tank (SST) wastes (surveillance and interim storage, stabilization, and isolation); encapsulated cesium and strontium; solid wastes; and liquid effluents. Environmental Restoration consists of two missions: past practice units (PPU) (including characterization and assessment of SST wastes) and surplus facilities. For convenience, both aspects of SST wastes are discussed in one place. A general category of supporting activities is also included. 20 refs., 14 figs., 7 tabs

  12. 76 FR 27344 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Science.gov (United States)

    2011-05-11

    ... and resource management activities must be guided by general principles that can be applied to... Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San Bernardino County... Management Plan/ Environmental Impact Statement for Mojave National Preserve. SUMMARY: In accordance with Sec...

  13. 77 FR 33237 - Saline Valley Warm Springs Management Plan/Environmental Impact Statement, Death Valley National...

    Science.gov (United States)

    2012-06-05

    ... Valley Warm Springs Management Plan/Environmental Impact Statement, Death Valley National Park, Inyo... an Environmental Impact Statement for the Saline Valley Warm Springs Management Plan, Death Valley... analysis process for the Saline Valley Warm Springs Management Plan for Death Valley [[Page 33238...

  14. Planning for and managing environmental restoration waste

    International Nuclear Information System (INIS)

    Miller, J.Q.

    1993-01-01

    This paper describes the approach used to support the management of environmental restoration (ER) waste. A general description is provided of the tools and techniques that have been developed and applied to produce waste generation forecast data and treatment, storage, and disposal capacity needs. The ER Program can now consistently manage ER waste streams from initial generation through ultimate disposal. Utilizing the valuable information that results from application of strategically planned systems and techniques demonstrates the ability to provide the necessary waste management support for the ER cleanup process

  15. 76 FR 44604 - Draft Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact...

    Science.gov (United States)

    2011-07-26

    ... Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact Statement AGENCY... availability of the Draft Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact... resident Canada geese. Action is needed at this time to manage the restored wetlands at the Park. The Plan...

  16. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  17. 78 FR 73559 - Moose-Wilson Corridor Comprehensive Management Plan, Environmental Impact Statement, Grand Teton...

    Science.gov (United States)

    2013-12-06

    ...-Wilson Corridor Comprehensive Management Plan, Environmental Impact Statement, Grand Teton National Park... is preparing a Comprehensive Management Plan and Environmental Impact Statement (EIS) for the Moose...; (2) distinguish the corridor's fundamental and other important resources and values; (3) clearly...

  18. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Science.gov (United States)

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  19. Department of Energy Environmental Management Plan for Oak Ridge Reservation

    International Nuclear Information System (INIS)

    1984-01-01

    The Environmental Program Management Plan for the Oak Ridge Complex was prepared in response to recommendations made at the Congressional hearing held in Oak Ridge on July 11, 1983, to discuss the extent and impact of mercury and other pollutants from DOE's Oak Ridge facilities. While this is a planning document and not a commitment of funds, this effort will help to focus DOE resources toward resolving environmental problems at Oak Ridge in a timely and cost-effective manner. The plan includes: (1) an environmental planning basis; (2) a brief description of the problems and proposed resolutions for each plant; (3) research and development requirements and funding schedules; (4) funding schedule summaries; and (5) continuing analyses and unresolved issues. The planning basis provides the foundation for identifying the environmental problems and their potential resolutions. While applicable environmental standards must be met, there is considerable latitude for interpretation of existing regulations and projection of future requirements. This latitude can have a significant impact on funding and scheduling. 11 figures, 8 tables

  20. Standard Review Plan for Environmental Restoration Program Quality Management Plans

    International Nuclear Information System (INIS)

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements

  1. 78 FR 55093 - Dog Management Plan, Supplemental Environmental Impact Statement, Golden Gate National Recreation...

    Science.gov (United States)

    2013-09-09

    ....YP0000] Dog Management Plan, Supplemental Environmental Impact Statement, Golden Gate National Recreation... the Dog Management Plan (Plan/SEIS), Golden Gate National Recreation Area (GGNRA), California. Current dog management in the park is based on a number of factors. Areas included in the GGNRA Citizens...

  2. Environmental restoration and waste management five year plan, fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ''bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information at the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals

  3. Environmental Restoration and Waste Management Site-Specific Plan (SSP) for fiscal year 1992 (FY92)

    International Nuclear Information System (INIS)

    1991-09-01

    The FY-92 Site-Specific Plan (FY-92 SSP) for environmental restoration and waste management at the Idaho National Engineering Laboratory (INEL) is designed to provide the reader with easy access to the status of environmental restoration and waste management activities at INEL. The first chapter provides background on INIEL's physical environment, site history and mission, and general information about the site and its facilities. In addition, this chapter discusses the inter-relationships between the Site Specific Plan, the Environmental Restoration and Waste Management Five-Year Plan, the environmental restoration and waste management prioritization systems, and the Activity Data Sheets (ADSs) for environmental restoration and waste management. This discussion should help readers understand what the SSP is and how it fits into the environmental restoration and waste management process at INEL. This understanding should provide the reader with a better context for understanding the discussions in the SSP as well as a better feel for how and what to comment on during the public comment period that will be held from the first of September through the end of October 1991

  4. Environmental restoration and waste management five-year plan, Fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of environmental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Over the past three years, the Five Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. The Five-Year Plan is not exclusively focused on near-term activities. It also expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. This goal was established in response to recommendations from the State and Tribal Government Working Group (STGWG) that DOE define a specific end point for completing necessary remediation and restoration activities. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals

  5. 76 FR 75556 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2011-12-02

    ...] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Taos Field Office, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of...) has prepared the Proposed Resource Management Plan/Final Environmental Impact Statement (Proposed RMP...

  6. 78 FR 13376 - Chronic Wasting Disease Management Plan/Environmental Impact Statement, Shenandoah National Park

    Science.gov (United States)

    2013-02-27

    ... and experience from management actions; and minimize the potential for health and safety issues for...] Chronic Wasting Disease Management Plan/Environmental Impact Statement, Shenandoah National Park AGENCY... National Environmental Policy Act of 1969 and the Council on Environmental Quality regulations, the...

  7. Environmental management in public hospitals: Environmental management in Colombia

    OpenAIRE

    Juan Pablo Rodríguez-Miranda; César Augusto García-Ubaque; María Camila García-Vaca

    2016-01-01

    Introduction: Activities in hospitals have environmental impacts which may pose risks to human and environmental health if they are not managed correctly. For this reason, it is necessary to implement an environmental management plan in hospitals that not only focuses on solid waste management but includes all aspects associated with health within institutions. Objective: To review environmental management aspects related to public hospitals in order to identify environmental management a...

  8. Environmental protection Implementation Plan

    International Nuclear Information System (INIS)

    Holland, R. C.

    1999-01-01

    This ''Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ''Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities

  9. ORNL long-range environmental and waste management plan: Program overview and summary

    International Nuclear Information System (INIS)

    Bates, L.D.; Berry, J.B.; Butterworth, G.E.

    1988-04-01

    The primary purpose of this report is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The docuemnt also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document: it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) Management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. The near-term (one to three years) part of the plan is a realistic assessment of the current program and ongoing capital projects and reflects the efforts preceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. Beyond the immediate time frame, the document reflects the strategy and the project and funding estimates as a snapshot at the time of publication. Annual revision will reflect the continuing evoltuion and development of environmental and waste management processes, characterizations, remedial actions, regulations, an strategies for the establishment and conduct of a comprehensive environmental and waste management program. 15 figs., 10 tabs

  10. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Science.gov (United States)

    2010-03-05

    ... DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final Environmental Impact... Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the National... the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona. On January...

  11. 76 FR 22721 - Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact...

    Science.gov (United States)

    2011-04-22

    ...] Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact Statement for the Bighorn Basin Resource Management Plan Revision Project, Cody and Worland Field Offices... Draft Resource Management Plan (RMP) for the Cody Field Office, a Draft RMP for the Worland Field Office...

  12. Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  13. Water environmental planning and management at the watershed scale:A case study of Lake Qilu,China

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    Water environmental planning and management has become essential for guiding the water pollution control activities.Past water pollution control activities have been site specific,with little thought on water quality standard reaching at the watershed scale.Based on the watershed approach,a seven-step methodological framework for water environmental planning and management was developed.The framework was applied to water environmental planning and management of the Lake Qilu watershed in Yunnan Province,China.Results show that the reduction amount of total nitrogen (TN) under the plan is 1,205 tons per year so that the target of environmental capacity can be reached in 2020.Compared with traditional methods,the framework has its prevalence and could be generalized to analogous watersheds.

  14. 75 FR 1806 - Draft General Management Plan and Environmental Impact Statement, New River Gorge National River, WV

    Science.gov (United States)

    2010-01-13

    ... visitor experiences. Management actions would build upon the cultural resource, interpretive, and... DEPARTMENT OF THE INTERIOR National Park Service Draft General Management Plan and Environmental... Interior. ACTION: Notice of availability of the Draft General Management Plan and Environmental Impact...

  15. 78 FR 67187 - Notice of Availability of the Draft General Management Plan/Wilderness Study/Environmental Impact...

    Science.gov (United States)

    2013-11-08

    ... focus on protecting natural resources and systems. Under this alternative, most of the Big Spring... Availability of the Draft General Management Plan/ Wilderness Study/Environmental Impact Statement for the... Management Plan/Wilderness Study/Environmental Impact Statement (GMP/WS/EIS) for the Ozark National Scenic...

  16. 76 FR 22917 - Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National Recreation Area...

    Science.gov (United States)

    2011-04-25

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-PWR-PWRO--0315-696; 8145-8B90-SZM] Dog... Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan and Environmental Impact Statement (Plan/DEIS). The Plan...

  17. Integration between environmental management and strategic planning in the oil and gas sector

    International Nuclear Information System (INIS)

    Magrini, Alessandra; Lins, Luiz dos Santos

    2007-01-01

    For activities that have a high possibility of causing environmental accidents, like in the oil and gas sector, it is reasonable to expect the environmental management to be an important variable within the company's strategic planning. However, this is not always true. In some cases, a change in the companies' attitude, abandoning a reactive position and assuming a proactive one, only happens upon the occurrence of serious environmental accidents with strong repercussion in the media. For the company that was the object of study, these accidents gave rise to deep changes in its environmental management, culminating in investments of approximately US$ 2.6 billion in environment, health and security, from 2000 to 2004. This was the highest amount to date invested on these areas by an oil company. This case study seeks to discuss the integration between environmental management and strategic planning in the oil and gas sector over a period of 10 years (from 1995 to 2004) in order to make a contextual analysis of the period before and after the environmental accidents possible

  18. 76 FR 75557 - Draft Environmental Impact Statement for General Management Plan/Wilderness Study, Hawaii...

    Science.gov (United States)

    2011-12-02

    ... Environmental Impact Statement for General Management Plan/ Wilderness Study, Hawaii Volcanoes National Park, Hawaii AGENCY: National Park Service, Interior. ACTION: Notice of intent. SUMMARY: The National Park... updating the General Management Plan (GMP) for Hawaii Volcanoes National Park. As part of this conservation...

  19. Albeni Falls Wildlife Management Plan - preliminary environmental assessment

    International Nuclear Information System (INIS)

    1996-04-01

    Bonneville Power Administration (BPA) proposes to fund the development and implementation of the Albeni Falls Wildlife Management Plan. Approved by the Northwest Power Planning Council (Council) in 1990, the project is a cooperative effort with the Interagency Work Group that includes the Idaho Department of Fish and Game (IDFG); United States Fish and Wildlife Service (USFWS); United States Forest Service (USFS); United States Army Corps of Engineers (COE); the Kalispel Tribe; and the Upper Columbia United Tribes (UCUT). The proposed action would enable the Interagency Work Group to protect and enhance a variety of wetland and riparian habitats, restore 28,587 habitat units lost as a result of the construction and operation of Albeni Falls Dam, and implement long-term wildlife management activities at selected sites within the overall study area. This Environmental Assessment (EA) examines the potential environmental effects of protecting and enhancing wildlife habitat in selected portions of a 225,077 hectare (556,160 acre) study area surrounding Lake Pend Oreille in Bonner County, and 7,770 hectare (19,200 acre) area surrounding Spirit and Twin lakes, in Kootenai County, Idaho. Four proposed activities are analyzed: habitat protection; habitat enhancement; operation and maintenance (O ampersand M); and monitoring and evaluation (M ampersand E)

  20. Waste management/waste certification plan for the Oak Ridge National Laboratory Environmental Restoration Program

    International Nuclear Information System (INIS)

    Clark, C. Jr.; Hunt-Davenport, L.D.; Cofer, G.H.

    1995-03-01

    This Waste Management/Waste Certification (C) Plan, written for the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL), outlines the criteria and methodologies to be used in the management of waste generated during ORNL ER field activities. Other agreed upon methods may be used in the management of waste with consultation with ER and Waste Management Organization. The intent of this plan is to provide information for the minimization, handling, and disposal of waste generated by ER activities. This plan contains provisions for the safe and effective management of waste consistent with the U.S. Environmental Protection Agency's (EPA's) guidance. Components of this plan have been designed to protect the environment and the health and safety of workers and the public. It, therefore, stresses that investigation derived waste (IDW) and other waste be managed to ensure that (1) all efforts be made to minimize the amount of waste generated; (2) costs associated with sampling storage, analysis, transportation, and disposal are minimized; (3) the potential for public and worker exposure is not increased; and (4) additional contaminated areas are not created

  1. 78 FR 13081 - Draft Environmental Impact Statement for General Management Plan, Everglades National Park, Florida

    Science.gov (United States)

    2013-02-26

    ... visitor use in the Park. The GMP will provide updated management direction for the entire park. The EEWS....YP0000] Draft Environmental Impact Statement for General Management Plan, Everglades National Park... the General Management Plan (GMP) and East Everglades Wilderness Study (EEWS) for Everglades National...

  2. Hanford environmental management program multi-year work plan FY1998

    International Nuclear Information System (INIS)

    Giese, K.A.

    1997-01-01

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year's work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ''Work Authorization'' identifies the impacted scope and requires the Contracting Officer's or Assistant Manager-Contracting Officer's Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ''Project Summary Section'' and Section Two is titled the ''Additional Sections at the Project Baseline Summaries Level''. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS number-sign RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP

  3. The DOE Office of Environmental Restoration and Waste Management comprehensive integrated planning process

    International Nuclear Information System (INIS)

    Aiken, R.J.; Draffin, C.W. Jr.; Pflock, K.T.

    1992-01-01

    This paper reports that comprehensive integrated planning is critical to the ultimate success of the DOE Office of Environmental Restoration and Waste Management's (EM) program because of the significant technical and institutional complexities, the tens of billions of dollars required, the regulatory and fiscal uncertainty, and the multitude of federal, state, and private sector organizations involved. Using the philosophy that sound and forward looking planning should guide budgetary and management decisionmaking, and that clear priorities are essential to program success, EM's comprehensive approach includes strategic planning, the annually updated EM Five-Year Plan, the EM Management Plan, and Site Specific Plans. Roadmaps (which facilitate issue identification and resolution), Activity Data Sheets, prioritization methodologies, and installation-specific Progress Charts are among the tools employed in support of the EM integrated planning process

  4. Environmental development plan: magnetic fusion

    International Nuclear Information System (INIS)

    1979-09-01

    This Environmental Development Plan (EDP) identifies the planning and management requirements and schedules needed to evaluate and assess the environmental, health and safety (EH and S) aspects of the Magnetic Fusion Energy Program (MFE). Environment is defined to include the environmental, health (occupational and public), and safety aspects

  5. The U.S. Department of Energy Environmental Restoration and Waste Management Five-Year Plan

    International Nuclear Information System (INIS)

    Grimm, P.

    1990-01-01

    Within the first month after being confirmed as this country's sixth secretary of energy, Admiral James D. Watkins (US Navy, Retired) promised Congress that he would deliver a comprehensive plan that outlines specific actions to undertake over the next 5 yr to achieve compliance with US environmental laws and to begin to clean up and restore those sites that we have contaminated over the past 40 yr. The Environmental Restoration and Waste Management Five-Year Plan was published in August 1989. As the admiral committed, the plan established and documented an agenda for compliance and cleanup against which progress in the area of environmental restoration and waste management would be measured and specifically identified actions and commitments to achieve this progress. In November 1989, an additional chapter identifying the applied research, development, demonstration, testing, and evaluation (RDDT and E) activities that would support the implementation of the plan was published. Last June, the US Department of Energy (DOE) issued the first annual update of the 5-yr plan. This update covers the years 1992-1996, notes the progress achieved during the past year, and incorporates the scope of both the original plan and the RDDT and E plan. The plan is divided into five sections: corrective activities, environmental restoration, waste operations, technology development, and transportation. Each section explains DOE's overall policies and plans for achieving compliance and cleanup at DOE's nuclear-related facilities

  6. Managing Water for African Cities Johannesburg City Implementation Plan Environmental Component Appraisal Report

    OpenAIRE

    Damhaug, T.

    2000-01-01

    Årsliste 2000 This is an appraisal of the environmental component of the Johannesburg City Implementation Plan under the Habitat guided programme "Managing Water for African Cities". The objective of this appraisal was to ensure the conformity of the plan with the objectives of the Regional Project and South Africa's needs and to explore the availability of domestic resources (human, institutional, and financial) required for efficient project implementation. The environmental component wi...

  7. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2013-02-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000 L16100000.DQ0000 LXSS04 K0000] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land Management, Interior. ACTION...

  8. 78 FR 43226 - Going-to-the-Sun Road Corridor Management Plan, Environmental Impact Statement, Glacier National...

    Science.gov (United States)

    2013-07-19

    ... effort will result in an integrated visitor and transportation management plan for the Going-to-the Sun... sustainability of the park's shuttle system, management of visitor use, and congestion and protection of natural...] Going-to-the-Sun Road Corridor Management Plan, Environmental Impact Statement, Glacier National Park...

  9. Integrating strategic environmental assessment with industry planning: a case study of the Pasquai-Porcupine forest management plan, Saskatchewan, Canada.

    Science.gov (United States)

    Noble, Bram F

    2004-03-01

    Strategic environmental assessment (SEA) is gaining widespread recognition as a tool for integrating environmental considerations in policy, plan, and program development and decision-making. Notwithstanding the potential of SEA to improve higher-order decision processes, there has been very little attention given to integrating SEA with industry planning practices. As a result, the benefits of SEA have yet to be fully realized among industrial proponents. That said, SEA practice is ongoing, albeit informally and often under a different label, and is proving to be a valuable tool for industry planning and decision-making. Based on a case study of the Pasquai-Porcupine forest management plan in Saskatchewan, Canada, this paper illustrates how an integrated approach to SEA can contribute to industry environmental decision-making and can enhance the quality and deliverability of industry plans.

  10. Tank waste remediation system environmental program plan

    International Nuclear Information System (INIS)

    Borneman, L.E.

    1998-01-01

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996)

  11. Tank waste remediation system environmental program plan

    Energy Technology Data Exchange (ETDEWEB)

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  12. Environmental Planning and Ecology Program Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2008-01-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  13. Environmental protection implementation plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1998-03-01

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable

  14. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    Science.gov (United States)

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  15. Environmental Monitoring Plan, Revision 6

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting

  16. 76 FR 31359 - Notice of Intent To Prepare an Environmental Impact Statement on a General Management Plan...

    Science.gov (United States)

    2011-05-31

    ... management activities, visitor activities, and developments that would be appropriate in the park in the future. In addition, the plan will generally address visitor-use related issues and provide management... Environmental Impact Statement on a General Management Plan Amendment/Wilderness Study for Lake Clark National...

  17. Environmental Management Plan for the Chemical Engineering Laboratory (LIQ of the National University of Colombia, Bogotá

    Directory of Open Access Journals (Sweden)

    Javier Gama Chávez

    2004-01-01

    Full Text Available An Enviromental Management Plan was formulated with the objective of improving the environmental performance of the Chemical Engineering Laboratory (LIQ. The plan was supported on the principles established by the ISO 140001 standard. In a first step, an environmental politic was proposed. Next, by means of an initial review of the laboratory, the most significant impacts related to the activities developed in the Laboratory were identified: dangerous chemical wastes accumulation, water contamination by effusions generation and air contamination. These impacts were the base for formulating following and control programs, furthermire, a training an communication program was done. All the programs, including the requiered documents and procedures, were published in the Environmental Management Plan and the Environmental Procedures Manual.

  18. 75 FR 41881 - Notice of Intent To Prepare a Shoreline Restoration and Management Plan/Environmental Impact...

    Science.gov (United States)

    2010-07-19

    ... lakeshore; and improved water quality. DATES: Any comments on the scope of issues to be addressed in the EIS... Restoration and Management Plan/Environmental Impact Statement (EIS) for Indiana Dunes National Lakeshore... impact statement (EIS) for a Shoreline Restoration and Management Plan (SRMP) for Indiana Dunes National...

  19. Adaptive management and environmental decision making. A case study application to water use planning

    International Nuclear Information System (INIS)

    Gregory, Robin; Failing, Lee; Higgins, Paul

    2006-01-01

    Adaptive management (AM) techniques are one of the principal tools proposed by environmental decision makers to provide flexible and responsive management approaches over time. However, the record of successful applications is surprisingly small. We believe that this in part reflects the lack of an intuitively plausible framework for evaluating AM initiatives. This paper outlines such a framework, based on the insights of decision analysis, for evaluating the use of AM as a technique to improve environmental management decisions. British Columbia's Water Use Plan (WUP) process, which has developed operating plans for more than 20 major hydroelectric facilities, is introduced as a case-study example. The discussion emphasizes that decisions to adopt adaptive management strategies involve judgments concerning tradeoffs across a variety of economic, environmental, and social objectives. As a result, adaptive management initiatives need to be carefully evaluated based on their merits relative to other alternatives. Within an AM framework, alternative experimental designs should be evaluated because the design of a preferred experiment involves choices among different levels of investment, the quality of available and desired future information, and different ecological, economic, and social risks. (author)

  20. 78 FR 26067 - General Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas

    Science.gov (United States)

    2013-05-03

    .... Alternative 2, the NPS preferred alternative, would support a broad ecosystem approach for preserve management... management of cross-boundary resource issues and the importance of encouraging partnerships to address and... Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas AGENCY: National...

  1. A Study on improvement of comprehensive environmental management system - activation of liberalized environmental management

    Energy Technology Data Exchange (ETDEWEB)

    Chung, Hweu Sung; Kang, Chul Goo [Korea Environment Institute, Seoul (Korea)

    1998-12-01

    As a part of improvement on a comprehensive environmental management system, this study was attempted to find an activating policy for a liberalized environmental management. This study provided an activation plan of reasonable environmental regulation reform and liberalized environmental management through the analysis of foreign examples and domestic situation. Furthermore, it analyzed an institutional mechanism for a smooth operation of liberalized environmental management. 68 refs., 5 figs., 51 tabs.

  2. US Department of Energy Oak Ridge Operations Environmental Management Public Involvement Plan for the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    1996-03-01

    This document was prepared in accordance with CERCLA requirements for writing community relations plans. It includes information on how the DOE Oak Ridge Operations Office prepares and executes Environmental Management Community relations activities. It is divided into three sections: the public involvement plan, public involvement in Oak Ridge, and public involvement in 1995. Four appendices are also included: environmental management in Oak Ridge; community and regional overview; key laws, agreements, and policy; and principal contacts

  3. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Science.gov (United States)

    2013-02-14

    ... Environmental Assessment for Monitor National Marine Sanctuary: Notice of Public Availability AGENCY: Office of National Marine Sanctuaries (ONMS), National Ocean Service (NOS), National Oceanic and Atmospheric... releasing the final management plan and environmental assessment for Monitor National Marine Sanctuary. DATE...

  4. Uranium Mill Tailings Remedial Action Project Environmental Line Management Audit Action Plan. Final report. Audit, October 26, 1992--November 6, 1992

    International Nuclear Information System (INIS)

    1993-07-01

    This Action Plan contains responses, planned actions, and estimated costs for addressing the findings discovered in the Environmental Management Audit conducted for the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRA), October 26 through November 6, 1992. This document should be read in conjunction with the Audit Report to ensure the findings addressed in this document are fully understood. The scope of the UMTRA Environmental Management Audit was comprehensive and encompassed all areas of environmental management except environmental programs pertaining to the National Environmental Policy Act (NEPA) compliance. The Audit Report listed 18 findings: 11 were identified as compliance findings, and the remaining 7 were best management practice findings. Root cause analysis was performed on all the findings. The results of the analysis as well as planned corrective actions are summarized in Section 5.0. All planned actions were prioritized using the Tiger Team Assessment Corrective Action Plan system. Based on assigned priorities, all planned actions were costed by fiscal year. This Action Plan contains a description of the organizational and management structures to be used to implement the Action Plan, a brief discussion of root cause analysis and funding, followed by the responses and planned actions for each finding. A member of the UMTRA Project Office (PO) has been assigned responsibility for tracking the progress on each of the findings. The UMTRA PO staff wrote and/or approved all of the corrective actions recorded in this Action Plan

  5. Environmental Monitoring Plan, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Blake, R G; Bertoldo, N A; Campbell, C G; Coty, J; Folks, K; Grayson, A R; Jones, H E; Nelson, J C; Revelli, M A; Wegrecki, T; Williams, R A; Wilson, K

    2010-01-27

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for

  6. Martin Marietta Energy Systems Environmental Management Plan, FY 1985-1989

    International Nuclear Information System (INIS)

    Furth, W.F.; Cowser, K.E.; Jones, C.G.; Mitchell, M.E.; Perry, T.P.A.; Stair, C.L.; Stinton, L.H.

    1985-05-01

    This plan contains the most recent revisions (as of April 1, 1985) identifying and resolving environmental problems during the next five years at the four installations managed for DOE by Martin Marietta Energy Systems, Inc. (Energy Systems). These installations are Oak Ridge National Laboratory (ORNL), Oak Ridge Gaseous Diffusion Plant (ORGDP), Oak Ridge Y-12 Plant (Y-12), and Paducah Gaseous Diffusion Plant (PGDP). The report is not an exhaustive catalogue of environmental programs for which funds will be or have been requested. The thrust is to categorize the environmental challenges by the nature of the challenge. The challenges are identified by categories: (1) radioactive waste, (2) hazardous waste, (3) co-contaminated waste (hazardous and radioactive contaminated), (4) conventional waste, (5) monitoring, and (6) remedial actions and decommissioning

  7. Martin Marietta Energy Systems Environmental Management Plan, FY 1985-1989

    Energy Technology Data Exchange (ETDEWEB)

    Furth, W.F.; Cowser, K.E.; Jones, C.G.; Mitchell, M.E.; Perry, T.P.A.; Stair, C.L.; Stinton, L.H.

    1985-05-01

    This plan contains the most recent revisions (as of April 1, 1985) identifying and resolving environmental problems during the next five years at the four installations managed for DOE by Martin Marietta Energy Systems, Inc. (Energy Systems). These installations are Oak Ridge National Laboratory (ORNL), Oak Ridge Gaseous Diffusion Plant (ORGDP), Oak Ridge Y-12 Plant (Y-12), and Paducah Gaseous Diffusion Plant (PGDP). The report is not an exhaustive catalogue of environmental programs for which funds will be or have been requested. The thrust is to categorize the environmental challenges by the nature of the challenge. The challenges are identified by categories: (1) radioactive waste, (2) hazardous waste, (3) co-contaminated waste (hazardous and radioactive contaminated), (4) conventional waste, (5) monitoring, and (6) remedial actions and decommissioning.

  8. CEBAF - environmental protection program plan

    International Nuclear Information System (INIS)

    1995-01-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan

  9. Comprehensive Environmental Management Process

    International Nuclear Information System (INIS)

    Hjeresen, D.L.; Roybal, S.L.

    1994-01-01

    This report contains information about Los Alamos National Laboratory's Comprehensive Environmental Management Plan. The topics covered include: waste minimization, waste generation, environmental concerns, public relations of the laboratory, and how this plan will help to answer to the demands of the laboratory as their mission changes

  10. Basic planning and work performance of Hanford Site environmental management activities

    International Nuclear Information System (INIS)

    Piper, L.L.

    1997-01-01

    This document provides an overview of the basic planning and work of the Department of Energy Richland Operations Office (DOE-RL). It defines key terms, concepts, and processes used in Hanford's Environmental Management (EM) activities. It is not intended to provide complete details on the topics discussed. It does, however, provide a roadmap of the overall process so that opportunities for tribal, regulator, and public involvement can be clearly identified. Many documents are referenced in this plan. Each is described in some detail in Section 5, and cross-references to that section are provided throughout the discussion in Sections 1 through 4

  11. Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    1993-01-01

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94

  12. Environmental Management 1995: Progress and plans of the Environmental Management Program

    International Nuclear Information System (INIS)

    1995-02-01

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program's activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy's Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ''site'' is a Department of Energy installation; a ''facility'' is a building located on a Department of Energy site; and an ''area'' is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ''year'' refers to the Federal Government's Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program

  13. Environmental Management 1995: Progress and plans of the Environmental Management Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program`s activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy`s Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ``site`` is a Department of Energy installation; a ``facility`` is a building located on a Department of Energy site; and an ``area`` is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ``year`` refers to the Federal Government`s Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program.

  14. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: the city of Belgrade.

    Science.gov (United States)

    Josimović, Boško; Marić, Igor; Milijić, Saša

    2015-02-01

    Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results. Copyright © 2014 Elsevier Ltd. All rights reserved.

  15. Near-Facility Environmental Monitoring Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    2000-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards

  16. Stakeholder perceptions of Environmental Management Plans as an environmental protection tool for major developments in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Sophie; Kemp, Simon [Faculty of Engineering and the Environment, University of Southampton, SO17 1BJ (United Kingdom); Hudson, Malcolm D., E-mail: mdh@soton.ac.uk [Faculty of Engineering and the Environment, University of Southampton, SO17 1BJ (United Kingdom); Institute for Life Sciences, University of Southampton, SO17 1BJ (United Kingdom)

    2016-01-15

    Insufficient implementation and the lack of legislative requirements for follow-up measures following the approval of projects are consistently highlighted as major shortcomings of Environmental Impact Assessment (EIA). Although adopted over 15 years ago by the World Bank, Environmental Management Plans (EMPs) were only semi-formalised in the UK in 2008 and arguably provide a continuous link or ‘bridge’ between the EIA process pre-consent and an Environmental Management System (EMS) post-consent. Drawing on twenty-one semi-structured interviews with stakeholders and thematic analysis of their responses, and a broad-scale practitioner survey, this study aimed to assess the effectiveness of EMPs as an environmental protection tool across the project lifecycle for major developments. The findings revealed a mixed picture of EMP effectiveness in practice, with EMPs only partially fulfilling a bridging role between EIA and EMS. There is no ‘gold standard’ terminology for EMPs, all having slightly different uses, thus presenting different focuses to different stakeholders and further enhancing variation in practice. For many stakeholders, the effectiveness was simply not known, due to the lack of communication and follow-up that still exists. EMP–EMS linkages were shown to be effective from the developer's perspective when a single organisation has involvement across all project phases, though weaknesses occur when multiple parties are involved. Among other stakeholders, knowledge varied significantly; whilst some were in agreement that the linkages worked, many were unaware of the connections and thought of them as two quite separate tools. Stakeholders advocated for the need to make EMPs a legal requirement; for improved communication between stakeholders during EMP implementation and increased documentation of project outcomes; and for EMPs to be consistently written by environmental professionals. Furthermore, weak links in the current process may be

  17. Stakeholder perceptions of Environmental Management Plans as an environmental protection tool for major developments in the UK

    International Nuclear Information System (INIS)

    Bennett, Sophie; Kemp, Simon; Hudson, Malcolm D.

    2016-01-01

    Insufficient implementation and the lack of legislative requirements for follow-up measures following the approval of projects are consistently highlighted as major shortcomings of Environmental Impact Assessment (EIA). Although adopted over 15 years ago by the World Bank, Environmental Management Plans (EMPs) were only semi-formalised in the UK in 2008 and arguably provide a continuous link or ‘bridge’ between the EIA process pre-consent and an Environmental Management System (EMS) post-consent. Drawing on twenty-one semi-structured interviews with stakeholders and thematic analysis of their responses, and a broad-scale practitioner survey, this study aimed to assess the effectiveness of EMPs as an environmental protection tool across the project lifecycle for major developments. The findings revealed a mixed picture of EMP effectiveness in practice, with EMPs only partially fulfilling a bridging role between EIA and EMS. There is no ‘gold standard’ terminology for EMPs, all having slightly different uses, thus presenting different focuses to different stakeholders and further enhancing variation in practice. For many stakeholders, the effectiveness was simply not known, due to the lack of communication and follow-up that still exists. EMP–EMS linkages were shown to be effective from the developer's perspective when a single organisation has involvement across all project phases, though weaknesses occur when multiple parties are involved. Among other stakeholders, knowledge varied significantly; whilst some were in agreement that the linkages worked, many were unaware of the connections and thought of them as two quite separate tools. Stakeholders advocated for the need to make EMPs a legal requirement; for improved communication between stakeholders during EMP implementation and increased documentation of project outcomes; and for EMPs to be consistently written by environmental professionals. Furthermore, weak links in the current process may be

  18. Towards integrated water resources management in Colombia: challenges and opportunities for spatial environmental planning

    Science.gov (United States)

    Salazar, Sergio; Hernández, Sebastián

    2015-04-01

    Only until 2010 was enacted the first national policy related to the integrated management of water resources in Colombia. In 2011 was established the Directorate for Integrated Water Resources Management within the Ministry of Environment and Sustainable Development. Between 2010 to 2013 were adopted the regulatory instruments to be developed within the hierarchical structure for spatial environmental planning around the water resources, considering both a transdisciplinary framework and a multi-ethnic and multi-participatory approach. In this context, there is a breakthrough in the development of strategic and tactic actions summarized as follows: i) technical guidelines or projects were developed for the spatial environmental planning at the macroscale river basins (i.e. Magdalena-Cauca river basin with 2.3 million hectares), meso-scale (river basins from 50.000 to 2 million hectares and aquifers) and local scale (catchments areas less than 50.000 hectares); ii) there is an advance in the knowledge of key hydrological processes in the basins of the country as well as actions to restore and preserve ecosystems essential for the regulation of water supply and ecosystem services; iii) demand characterization introducing regional talks with socio-economic stakeholders and promoting water efficiency actions; iv) water use regulation as a way for decontamination and achieving quality standards for prospective uses; v) introduction of risks analysis associated with water resources in the spatial environmental planning and establishment of mitigation and adaptation measures; vi) strengthening the monitoring network of water quality and hydrometeorological variables; vii) strengthening interactions with national and international research as well as the implementation of a national information system of water resources; viii) steps towards water governance with the introduction of socio-economic stakeholder in the spatial environmental planning and implementation of

  19. Integration of environmental flow assessment and freshwater conservation planning: a new era in catchment management

    CSIR Research Space (South Africa)

    Nel, JL

    2011-03-01

    Full Text Available Integrated water resources management offers an ideal platform for addressing the goals of freshwater conservation and climate change adaptation. Environmental flow assessment and systematic conservation planning have evolved separately...

  20. Strategic Plan for Sustainable Energy Management and Environmental Stewardship for Los Angeles Unified School District

    Energy Technology Data Exchange (ETDEWEB)

    Walker, A.; Beattie, D.; Thomas, K.; Davis, K.; Sim, M.; Jhaveri, A.

    2007-11-01

    This Strategic Plan for Sustainable Energy Management and Environmental Stewardship states goals, measures progress toward goals and how actions are monitored to achieve continuous improvement for the Los Angeles Unified School District.

  1. Energy planning and management plan

    International Nuclear Information System (INIS)

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  2. Environmental Development Plan: uranium mining, milling, and conversion

    International Nuclear Information System (INIS)

    1979-08-01

    This Environmental Development Plan (EDP) identifies the planning and management requirements and schedules needed to evaluate and assess the environmental, health, and safety (EH and S) aspects of the uranium mining, milling, and conversion technologies. The plan represents the collective perceptions of EH and S concerns and requirements and knowledge of ongoing research programs of most of the Federal agencies involved in significant EH and S R and D program management, standards setting, or regulatory activities associated with uranium mining, milling, and conversion

  3. Routine Radiological Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Bechtel Nevada

    1998-01-01

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs

  4. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  5. Burlington Bottoms Wildlife Mitigation Project. Final environmental assessment/management plan and finding of no significant impact

    International Nuclear Information System (INIS)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property

  6. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  7. 76 FR 57760 - Notice of Availability of Draft Resource Management Plan and Draft Environmental Impact Statement...

    Science.gov (United States)

    2011-09-16

    ... approximately 707,000 subsurface acres of Federal mineral estate. Decisions in the Colorado River Valley RMP... Availability of Draft Resource Management Plan and Draft Environmental Impact Statement for the Colorado River Valley Field Office, Colorado AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability...

  8. Environmental implementation plan: Chapter 14, Environmental compliance tracking and data management

    International Nuclear Information System (INIS)

    Story, C.H.

    1993-01-01

    Environmental projects, issues, and programs have become increasingly important to the Westinghouse Savannah River Company (WSRC) management and the Department of Energy (DOE). A compliance-tracking system has been developed to monitor environmental requirements and commitments because they have become increasingly complex and numerous. An Environmental Data Management (EDM) steering committee was formed in October 1987 to develop computer system solutions to environmental needs. The committee's main objective is to coordinate, within SRS divisions, the separate efforts that have been or are being developed to meet regulatory requirements and specific programmatic goals. The Environmental and Graphical Information Systems (E ampersand GIS) Program was recently developed to establish a more formal organizational structure and enhance the coordination of geographical information systems (GIS) and environmental data management (EDM) activities at SRS. The general strategy of the program is to establish a coordination focal point for GIS and EDM activities, to provide for the integration of the several environmental and graphical information systems which exist mostly in stand-alone arrangements, and to guide the development of data management and geographical information applications in order to achieve alignment with Site computing architecture and standards. The E ampersand GIS Program will enhance the Site's ability to respond to data requirements in support of new missions, changing directives, and increasing regulatory requirements

  9. Environmental restoration and waste management five-year plan, Fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    The US Department of Energy (DOE) understands that cleaning up the Nation's nuclear-related sites and facilities affects many different segments of the public, ranging from communities near DOE facilities to engineers concerned with developing new technologies to clean up the environment. In an effort to make the Environmental Restoration and Waste Management Five-Year Plan for Fiscal Years (FY) 1994--1998 more responsive to your concerns, DOE invites your comments on the plan. Volume II contains 37 Installation Summaries that provide a synopsis of past, present and future activities of each major installation, and Progress Charts

  10. Investigation-Derived Waste Management Plan. Revision 2

    International Nuclear Information System (INIS)

    Molen, G.

    1995-01-01

    SRS has implemented a comprehensive environmental program to maintain compliance with environmental regulations and mitigate impacts to the environment. One element of the environmental program is the investigation of inactive waste units. Environmental Investigation-Derived Waste (IDW). IDW may include purge water , soil cuttings, drilling fluids, well pumping test and development water, decontamination solutions, contaminated equipment, and personal protection equipment (PPE). In cases where investigations confirm the presence of contamination and the IDW contains waste constituents in concentrations high enough to be of environmental or health concern, special management procedures are warranted. This IDW Management Plan describes specific SRS initiatives for IDW management. The goal is the development of a plan for prudent management of IDW from environmental investigations that is protective of human health and the environment

  11. Environmental management the supply chain perspective

    CERN Document Server

    Wong, Christina W Y; Lun, Y H Venus; Cheng, T C E

    2015-01-01

    In view of the increasing quest for environmental management in businesses, this book provides a good reference to firms to understand how they may manage their supply chains to improve business and environmental performance. The book consists of six chapters covering such topics as environmental management, environmental management practices with supply chain efforts, collaborative environmental management, organizational capabilities in environmental management, environmental disclosure, and closed-loop supply chains. The book presents theory-driven discussions on the link between environmental management and business performance in the context of supply chain management. The book will be useful for firms to learn from the research findings and real-life cases to develop plans to implement environmental management practices jointly with supply chain partners.

  12. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  13. SNL/CA Environmental Planning and Ecology Program Annual Report 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2007-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  14. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: The city of Belgrade

    International Nuclear Information System (INIS)

    Josimović, Boško; Marić, Igor; Milijić, Saša

    2015-01-01

    Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results

  15. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: The city of Belgrade

    Energy Technology Data Exchange (ETDEWEB)

    Josimović, Boško, E-mail: bosko@iaus.ac.rs; Marić, Igor; Milijić, Saša

    2015-02-15

    Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results.

  16. Best management practices plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-02-01

    This Best Management Practices (BMP) Plan has been developed as part of the environmental monitoring program at Waste Area Grouping (WAG) 6. The BMP Plan describes the requirements for personnel training, spill prevention and control, environmental compliance, and sediment/erosion control as they relate to environmental monitoring activities and installation of Monitoring Station 4 at WAG 6

  17. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    International Nuclear Information System (INIS)

    1993-03-01

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL's ER and WM programs as managed by DOE's Idaho Field Office (DOE-ID)

  18. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL`s ER and WM programs as managed by DOE`s Idaho Field Office (DOE-ID).

  19. Environmental Management Plan for the Chemical Engineering Laboratory (LIQ) of the National University of Colombia, Bogotá

    OpenAIRE

    Javier Gama Chávez; Martha Lozano García; Paulo César Narváez Rincón; Óscar Javier Suárez Medina

    2004-01-01

    An Enviromental Management Plan was formulated with the objective of improving the environmental performance of the Chemical Engineering Laboratory (LIQ). The plan was supported on the principles established by the ISO 140001 standard. In a first step, an environmental politic was proposed. Next, by means of an initial review of the laboratory, the most significant impacts related to the activities developed in the Laboratory were identified: dangerous chemical wastes accumulation, water cont...

  20. 77 FR 1720 - Final Environmental Impact Statement for the White-Tailed Deer Management Plan, Rock Creek Park

    Science.gov (United States)

    2012-01-11

    ... Environmental Impact Statement for the White-Tailed Deer Management Plan, Rock Creek Park AGENCY: National Park...), Rock Creek Park, Washington, DC The Plan will support long-term protection, preservation, and restoration of native vegetation and other natural and cultural resources in Rock Creek Park. DATES: The NPS...

  1. Managing environmental aspects resulting from energy consumption

    International Nuclear Information System (INIS)

    2001-01-01

    Human health and environmental impacts of fossil fuel energy consumptions are examined and the ongoing effort to align energy management plans with sustainable development strategies and environmental management systems is described. Human health impacts are manifested in mortality rates, hospital admissions, visits to emergency rooms and physicians' offices, reduced physical performance, increase in the use of medications, impaired pulmonary function and a variety of lesser (or less perceptible) effects. Environmental impacts are demonstrated through climatic change, increase in greenhouse gas emissions, increase in smog, acid rain, and soil, groundwater and surface water contamination. The importance of commitment, integrated planning, measurement and evaluation, periodic review and improvement and documentation in aligning energy and environmental management plans are highlighted, along with the need for behavioral and operational changes, the creation of employee awareness and training, and the adoption of green procurement and life cycle costing. Adoption of the ISO 14000 approach to managing energy consumption is also seen as an important step in the direction of integrated energy and environmental management and sustainable development

  2. Management and Planning for Small Community Wastewater

    Science.gov (United States)

    Operators Small Systems Management and Planning for Small Community Wastewater The NESC has provided of Clean Water Agencies (NACWA) Achieving Environmental Excellence: An Environmental Management Agencies, The Office of Wastewater Management at EPA, in cooperation with the Global Environment and

  3. Environmental management system

    International Nuclear Information System (INIS)

    2004-01-01

    An Environmental Management System was implemented in ANAV in 1999, including the two nuclear sites of the Asco and Vandellos II nuclear power plants. This implementation entailed formulation of the ANAV Environmental Policy, preparation of an Environmental Management Plan (PLAGMA) supported by the Environmental Aspects Manuals (MASMA) of each site and their operating procedures, modification of the organizational structure to create the Environment Unit, in charge of implementing the SIGEMA, and the Environment Committee, the governing body that reviews the results obtained and environmental goals to be achieved, and direct involvement of all the different ANAV organization in continuous improvement of the SIGEMA implementation. Special attention is paid to evolution of the environmental indicators, to communication and specific training in environmental issues, and to waste management and the different programs for increasing waste recycling and assessment, as well as to minimization programs. The article details the different approaches used to improve the environmental results in these last five years, which have allowed ANAV to maintain the ISO-14001 Certification since 1999. (Author)

  4. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, {approximately} 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner.

  5. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-06-01

    This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, ∼ 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner

  6. Hanford Site Waste Management Plan

    International Nuclear Information System (INIS)

    1988-12-01

    The Hanford Site Waste Management Plan (HWMP) was prepared in accordance with the outline and format described in the US Department of Energy Orders. The HWMP presents the actions, schedules, and projected costs associated with the management and disposal of Hanford defense wastes, both radioactive and hazardous. The HWMP addresses the Waste Management Program. It does not include the Environmental Restoration Program, itself divided into the Environmental Restoration Remedial Action Program and the Decontamination and Decommissioning Program. The executive summary provides the basis for the plans, schedules, and costs within the scope of the Waste Management Program at Hanford. It summarizes fiscal year (FY) 1988 including the principal issues and the degree to which planned activities were accomplished. It further provides a forecast of FY 1989 including significant milestones. Section 1 provides general information for the Hanford Site including the organization and administration associated with the Waste Management Program and a description of the Site focusing on waste management operations. Section 2 and Section 3 describe radioactive and mixed waste management operations and hazardous waste management, respectively. Each section includes descriptions of the waste management systems and facilities, the characteristics of the wastes managed, and a discussion of the future direction of operations

  7. Project Management in the Field of Innovative Technologies of Environmental Management

    Directory of Open Access Journals (Sweden)

    Potasheva Galina

    2016-01-01

    Full Text Available The article deals with the application of project management in the field of innovative technologies of environmental management. This article examines the sustainability of integrated development environment, and society in the “three ones” concept, which covers all major aspects of development and global change: ecological, social, economic-based planning. But the transition from the national level to the practice of management in the real institutional environment revealed the unresolved systemic issues such as: economic development is considered at the national level; the management of social processes is in the area of responsibility of regions; environmental issues are concentrated at the local, municipal level. To solve this problem, this article discusses the design aspects of environmental management. So in designing the required high degree of understanding of interdependencies and patterns of organizing itself independently of the system that explains the differences between technical and social design. Technical design relies on mechanistic management, while social planning is understood as a system or organic project management. Hence it is safe to state the fact that project management in the environmental management of the country is concentrated in specific design, planning, technical and management solutions, as well as in the creation interested in these effects in all spheres and strata of society.

  8. Data management plan for the Oak Ridge Environmental Information System, Version 1. 1

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-04

    The Data Management Plan (DMP) describes the data management objectives, system components, data base structure and contents, system maintenance, data processing, and user interface for the prototype phase of the Oak Ridge Environmental Information System (OREIS). The major goals of OREIS data management are to compile data of known quality, to maintain the integrity of the data base, and to provide data to users. The DMP defines the requirements, describes the responsibilities, and references the procedures for meeting the data management objectives. Emphasis is on management of measurement data and the associated metadata used to support its proper interpretation and legal defensibility. The DMP covers transmittal, processing, storage, and data access activities associated with OREIS. The OREIS data dictionary is provided as an appendix.

  9. Data management plan for the Oak Ridge Environmental Information System, Version 1.1

    International Nuclear Information System (INIS)

    1992-01-01

    The Data Management Plan (DMP) describes the data management objectives, system components, data base structure and contents, system maintenance, data processing, and user interface for the prototype phase of the Oak Ridge Environmental Information System (OREIS). The major goals of OREIS data management are to compile data of known quality, to maintain the integrity of the data base, and to provide data to users. The DMP defines the requirements, describes the responsibilities, and references the procedures for meeting the data management objectives. Emphasis is on management of measurement data and the associated metadata used to support its proper interpretation and legal defensibility. The DMP covers transmittal, processing, storage, and data access activities associated with OREIS. The OREIS data dictionary is provided as an appendix

  10. Environmental Management in Product Chains

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Forman, Marianne

    2009-01-01

    between existing resources, norms and values and external pressures for environmental management (second section). A model for the types of corporate network relations that need to be mapped and understood in order to analyze and/or develop environmental management in a product chain (third section......The chapter aims at giving background to companies, consultants, governmental regulators, NGOs etc. for the analysis and planning of environmental management in specific product chains through: A framework for understanding environmental management in product chains as shaped by the interaction......). An overview of examples from our own research and from literature of the type and the role of environmental issues and initiatives in product chains (fourth section). A typology for characterizing corporate strategies as part of environmental management in product chains and characterizing those competencies...

  11. Guidance document for the preparation of waste management plans for the Environmental Restoration Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Clark, C. Jr.

    1993-07-01

    A project waste management (WM) plan is required for all Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program remedial investigation, decommission and decontamination (D ampersand D), and remedial action (RA) activities. The project WM plan describes the strategy for handling, packaging, treating, transporting, characterizing, storing, and/or disposing of waste produced as part of ORNL ER Program activities. The project WM plan also contains a strategy for ensuring worker and environmental protection during WM activities

  12. How do environmental policies fit within larger strategic planning processes

    OpenAIRE

    Crowe, Lynn

    2015-01-01

    This chapter explores how environmental policies fit within larger strategic processes relevant to sport management and development. It identifies key policy areas such as environmental impact assessment, sustainable land use planning, environmental protection and visitor impact management. Good practice and guidelines which will enable sport managers to integrate their work with these environmental policies are explored. Detailed guidance on design and longer term management and maintenance ...

  13. Using management action plans to integrate program improvement efforts

    Energy Technology Data Exchange (ETDEWEB)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N. [Project Performance Corporation, Sterling, VA (United States)

    1994-12-31

    The Department of Energy`s (DOE`s) Environmental Management Program is the country`s largest and most sophisticated environmental program to date. The rapid expansion of the DOE`s environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program`s management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities.

  14. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  15. 78 FR 23491 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2013-04-19

    ... Management Planning; Correction AGENCY: Forest Service, USDA. ACTION: Correcting amendment. SUMMARY: This..., revising, and monitoring land management plans (the planning rule). The National Forest Management Act... Land Management Planning Rule Final Programmatic Environmental Impact Statement of January 2012. List...

  16. ORNL Long-Range Environmental and Waste Management Plan: Program overview and summary

    International Nuclear Information System (INIS)

    Bates, L.D.; Berry, J.B.; Butterworth, G.E.

    1987-12-01

    The primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirments. The document also provides an estimate of the resources required to implenent the current plan. As with any document of this nature, the near-term (one to three years) part of the plan is a realistic assessment of the current program and ongoing capital projects and relects the efforts preceived to be necesary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. Beyond the immediate time frame, the document reflects the strategy and the project and funding estimates as a snapshot at the time of publication. 15 figs., 10 tabs

  17. Configuration Management Plan for K Basins

    International Nuclear Information System (INIS)

    Weir, W.R.; Laney, T.

    1995-01-01

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Programclose quotes

  18. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex

  19. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  20. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  1. Report on Saginaw Bay Area Environmental Policy, Planning and Management survey. Final report, April 1991-March 1992

    Energy Technology Data Exchange (ETDEWEB)

    He, C.; Zhao, W.; Edens, T.C.

    1992-04-01

    An environmental policy, planning, and management survey was conducted in the Saginaw Bay area in the Fall of 1991. The survey identified unemployment, factory closure and environmental quality degradation as the major economic and environmental problems in the area. Surface water contamination, excessive nutrients and zebra mussel infestation were the most serious problems affecting water quality. Soil erosion, excessive fertilization and pesticide applications were the most important non-point sources of water pollution. Toxic chemicals, phosphorus, suspended solids, heavy metals were the major water pollutants in the area. Pollution cleanup, land use planning, and control of zebra mussels were identified as the top implementation priorities for the area. Recommendations made by the respondents for improving environmental quality are summarized in the report.

  2. Managing environmental enhancement plans for individual research projects at a national primate research center.

    Science.gov (United States)

    Thom, Jinhee P; Crockett, Carolyn M

    2008-05-01

    We describe a method for managing environmental enhancement plans for individual research projects at a national primate research center where most monkeys are assigned to active research projects. The Psychological Well-being Program (PWB) at the University of Washington National Primate Research Center developed an Environmental Enhancement Plan form (EEPL) that allows PWB to quantify and track changes in enrichment allowances over time while ensuring that each animal is provided with as much enrichment as possible without compromising research. Very few projects involve restrictions on toys or perches. Some projects have restrictions on food treats and foraging, primarily involving the provision of these enrichments by research staff instead of husbandry staff. Restrictions are not considered exemptions unless they entirely prohibit an element of the University of Washington Environmental Enhancement Plan (UW EE Plan). All exemptions must be formally reviewed and approved by the institutional animal care and use committee. Most exemptions from elements of the UW EE Plan involve social housing. Between 2004 and 2006, the percentage of projects with no social contact restrictions increased by 1%, but those prohibiting any tactile social contact declined by 7%, and projects permitting tactile social contact during part of the study increased by 9%. The EEPL form has facilitated informing investigators about the enrichment their monkeys will receive if no restrictions or exemptions are requested and approved. The EEPL form also greatly enhances PWB's ability to coordinate the specific enrichment requirements of a project.

  3. Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992

    International Nuclear Information System (INIS)

    Latham, A.R.; Evans, R.B.

    1991-11-01

    DOE Order 5400.1, ''General Environmental Protection Program,'' established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Field Office, Nevada (DOE/NV) has prepared this second annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Operations (AMO), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions. 7 figs

  4. The relationship between the Municipal Master Plan and local Watershed Plans in water management

    Directory of Open Access Journals (Sweden)

    Denise Gallo Pizella

    2015-07-01

    Full Text Available The National Water Resources Policy has as one of its tools the drafting of local Water Resource Plans. In view of water resources planning and its relationship to land use planning, the aim of this work is to analyze the institutional and legal difficulties and the potential for an integrated system of water resources management. For this, we used the method of documentary and bibliographic research, beginning with the “Estatuto da Cidade”, a law for urban policy in Brazil, and literature on water management at the municipal and watershed levels. At the municipal level, the “Master Plan” (municipal plan of land use planning became the main instrument of territorial and municipal management, defining the parameters for the compliance of social, environmental and economic functions of real property. In this sense, the municipalities have a responsibility to protect water resources and, without local support, territorial and water management cannot be integrated in the context of the river basin. Despite the difficulties of including environmental variable in urban planning, the Master Plan has the potential to shape local water management systems that are environmentally sustainable and that progressively improve water quality and quantity within the watershed. Similarly, with more significant participation of the municipality in the Basin Committee, it is possible that the forms of municipal land use and occupation can be considered during the development and implementation of the Basin Plan. Thus, the management of water resources can occur integrally.

  5. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ''Partnership in Environmental Excellence'' formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex

  6. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  7. Environmental management frameworks for offshore mining: the New Zealand approach

    KAUST Repository

    Ellis, Joanne

    2017-07-27

    The New Zealand region contains untapped natural mineral, oil, and gas resources while also supporting globally unique and diverse faunal communities that need to be managed sustainably. In this paper key information from the international literature is reviewed that can underpin an Environmental Mining Management System which includes elements of Environmental Risk Assessment, Environmental Impact Assessment and Environmental Management Planning. This paper focuses on four developing areas of seafloor mining activities presently being undertaken or planned in the New Zealand region: hydrocarbons (oil and gas), minerals, ironsands and phosphorite nodules. A number of issues with the implementation of environmental management systems are identified including the difficulty of assessing new marine activities or technologies and the need for standardised reporting metrics. Finally, the development of ecosystem-based management and marine spatial planning is discussed which will be required to enhance environmental mining management frameworks in New Zealand.

  8. Environmental Requirements Management

    Energy Technology Data Exchange (ETDEWEB)

    Cusack, Laura J.; Bramson, Jeffrey E.; Archuleta, Jose A.; Frey, Jeffrey A.

    2015-01-08

    CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

  9. Integrated wastewater management planning for DOE's Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    Hopkins, J.; Barthel, J.; Wheeler, M.; Conroy, K.

    1996-01-01

    Rocky Mountain Remediation Services, L.L.C. (RMRS), jointly formed by Morrison Knudsen Corporation and BNFL Inc., provides international experience in the nuclear, environmental, waste management, decontamination and decommissioning (D ampersand D) , and project management industry. The company is currently the environmental restoration, waste management, and D ampersand D subcontractor for Kaiser-Hill Company at the Rocky Flats Environmental Technology Site (RFETS). RMRS offers unique solutions and state-of-the-art technology to assist in resolving the issues that face industries today. RMRS has been working on methods to improve cost savings recognized at RFETS, through application of unique technologies and process engineering. RMRS prepared and is implementing a strategy that focused on identifying an approach to improve cost savings in current wastewater treatment systems and to define a low-cost, safe and versatile wastewater treatment system for the future. Development of this strategy, was targeted by Department of Energy (DOE) Headquarters, DOE Rocky Flats Field Office and Kaiser-Hill as a ''Project Breakthrough'' where old concepts were thrown out the door and the project goals and objectives were developed from the groundup. The objectives of the strategy developed in a project break through session with DOE included lower lifecycle costs, shutdown of one of two buildings at RFETS, Building 374 or Building 774, reduced government capital investment, and support of site closure program goals, identified as the site's Accelerated Site Action Plan (ASAP). The recommended option allows for removal of water treatment functions from Building 374, the existing process wastewater treatment facility. This option affords the lowest capital cost, lowest unit operating cost, lowest technical management risk, greatest support of ASAP phasing and provides the greatest flexibility for design with unforeseen future needs

  10. Environmental Development Plan for advanced isotope separation

    International Nuclear Information System (INIS)

    1979-05-01

    This EDP identifies the planning and management requirements and schedules needed to evaluate and assess the environmental, health, and safety aspects of the Advanced Isotope Separation (AIS) program. Current AIS processes include the molecular and atomic vapor laser processes and the plasma process. This document covers the technology program, environmental concerns and requirements, and environmental strategy

  11. Environmental Management Systems: A Framework for Planning Green Campuses.

    Science.gov (United States)

    Keniry, Julian

    2003-01-01

    Drawing on recent survey data from the National Wildlife Federation and other publications, explains what an environmental management system is and identifies its components; examines how environmental management systems have been applied in higher education settings; reports on trends in implementation; and illustrates how the environmental…

  12. 2002 WIPP Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-09-30

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  13. 75 FR 53980 - Notice of Availability of the Record of Decision; Elk Management Plan/Environmental Impact...

    Science.gov (United States)

    2010-09-02

    ... March 8, 2010. The Preferred Alternative will make use of skilled public volunteers to assist the Park... DEPARTMENT OF THE INTERIOR National Park Service Notice of Availability of the Record of Decision; Elk Management Plan/Environmental Impact Statement for Theodore Roosevelt National Park ACTION: Notice...

  14. Routine Radiological Environmental Monitoring Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1999-12-31

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs.

  15. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program's management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention

  16. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program`s management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention.

  17. 75 FR 26270 - Environmental Planning and Historic Preservation Compliance Costs Policy; Environmental Planning...

    Science.gov (United States)

    2010-05-11

    ...] Environmental Planning and Historic Preservation Compliance Costs Policy; Environmental Planning and Historic... draft Environmental Planning and Historic Preservation Compliance Costs policy and a draft Environmental Planning and Historic Preservation Mitigation policy. DATES: Comments must be received by June 10, 2010...

  18. 76 FR 17471 - Air Tour Management Plan Environmental Assessment for Mount Rainier National Park, WA; Public...

    Science.gov (United States)

    2011-03-29

    ... draft alternatives in the development of an Air Tour Management Plan (ATMP) for the Mount Rainier... Environmental Assessment (EA), an ATMP, and associated rulemaking actions which comply with the National...: http://parkplanning.nps.gov/MORA_ATMP or sent to the mailing addresses listed in the ``FOR FURTHER...

  19. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Nordstrom, Jenifer [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-02-01

    This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Non-routine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

  20. Waste management - an integral part of environmental management systems

    Energy Technology Data Exchange (ETDEWEB)

    Hamm, Ulrich

    1998-12-01

    To consider waste as a resource instead of an annoyance with which the management has to cope with, has become an unavoidable task for modern managers. The task the management has to take to secure competitiveness in an environment of rising complexity of production processes and further increasing legal requirements, is to manage waste as much as other recourses are managed. Waste has to be considered an aspect of planning and decision process just as business plans or logistics are. Main themes discussed in this publication comprise waste management, implementation of waste management as an integral part of environmental management systems, and management approach to waste - the results. 4 figs.

  1. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  2. Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed

  3. SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2005-05-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  4. 77 FR 39253 - Final Environmental Impact Statement on the Denali Park Road Vehicle Management Plan, Denali...

    Science.gov (United States)

    2012-07-02

    ... online at the NPS Planning, Environmental and Public Comment Web site at http://parkplanning.nps.gov/dena... served well as a way to manage vehicle use, while providing high quality visitor opportunities to see... framework for vehicle use based on indicators and standards for visitor experiences and resource protection...

  5. Oak Ridge Reservation site management plan for the environmental restoration program

    International Nuclear Information System (INIS)

    1995-09-01

    This report describes the overall approach for addressing environmental contamination on the Oak Ridge Reservation (ORR) National Priorities List site located in east Tennessee. The cleanup strategy reflected in this site management plan (SMP) has been developed to accelerate the transition of areas of concern (AOCs) from characterization to remediation by making decisions at the watershed scale based on recommended land uses. Project scoping involves the use of defined remedial action objectives, which are based in part on the land uses selected for the project sites. To provide a consistent land use approach that accommodates the needs of all stakeholders responsible for the remediation and reutilization of the ORR, a reservation-wide strategy has been developed. The Common Ground process is a stakeholder-driven process to determine preferred land use options for the ORR so that clean-up operations will be based on the most likely and acceptable land uses. DOE utilized the information gathered in the Common Ground process to recommend desired land uses for the ORR. The land uses recommended by DOE as a result of the Common Ground process are being used for planning land and facility use/reuse for the next 25 years. Land uses recommended for the ORR in conducting CERCLA remedial activities are conservation, industrial use, and waste management

  6. Environmental monitoring plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs

  7. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  8. Managing the environmental impacts of land transport: integrating environmental analysis with urban planning

    International Nuclear Information System (INIS)

    Irving, Paul; Moncrieff, Ian

    2004-01-01

    Ecological systems have limits or thresholds that vary by pollutant type, emissions sources and the sensitivity of a given location. Human health can also indicate sensitivity. Good environmental management requires any problem to be defined to obtain efficient and effective solutions. Cities are where transport activities, effects and resource management decisions are often most focussed. The New Zealand Ministry of Transport has developed two environmental management tools. The Vehicle Fleet Model (VFM) is a predictive database of the environmental performance of the New Zealand traffic fleet (and rail fleet). It calculates indices of local air quality, stormwater, and greenhouse gases emissions. The second is an analytical process based on Environmental Capacity Analysis (ECA). Information on local traffic is combined with environmental performance data from the Vehicle Fleet Model. This can be integrated within a live, geo-spatially defined analysis of the overall environmental effects within a defined local area. Variations in urban form and activity (traffic and other) that contribute to environmental effects can be tracked. This enables analysis of a range of mitigation strategies that may contribute, now or in the future, to maintaining environmental thresholds or meeting targets. A case study of the application of this approach was conducted within Waitakere City. The focus was on improving the understanding of the relative significance of stormwater contaminants derived from land transport

  9. Social, economic and environmental evaluation of agri-environmental beneficial management practices

    OpenAIRE

    Kitchen, Amy Elizabeth

    2012-01-01

    In British Columbia, the Canada-British Columbia Environmental Farm Plan Beneficial Management Practices Program (BMP Program) encourages the adoption of agri-environmental practices on farms. The BMP Program is a voluntary and confidential program, which is jointly funded by the BC Ministry of Agriculture and Agriculture and Agri-Food Canada. Since 2005 the BMP Program has provided funding to farmers to adopt agri-environmental Beneficial Management Practices (BMPs) and during this time no e...

  10. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  11. Wetland Planning: Current Problems and Environmental Management Proposals at Supra-Municipal Scale (Spanish Mediterranean Coast

    Directory of Open Access Journals (Sweden)

    María-Teresa Sebastiá-Frasquet

    2014-03-01

    Full Text Available The policies that define the use and management of wetlands in Spain have undergone tremendous changes in recent decades. During the period of 1950–1980, Land Reform Plans promoted filling and draining of these areas for agricultural use. In 1986, with the incorporation of Spain to the European Union (EU, there was a sudden change of direction in these policies, which, thereafter, pursued restoring and protecting these ecosystems. This change, combined with increasing urban development and infrastructure pressures (e.g., roads, golf courses, etc., creates a conflict of uses which complicates the management of these ecosystems by local governments. This study analyzes the effectiveness of policies and management tools of important coastal wetlands at the local scale in the Valencian Community (Western Mediterranean Sea using a strengths-weaknesses-opportunities-threats (SWOT methodology. A supra-municipal model of environmental planning is proposed to enable consistent management at a regional scale. This model enhances local government’s effectiveness and it can be applied in other areas with similar problems.

  12. Informing Environmental Water Management Decisions: Using Conditional Probability Networks to Address the Information Needs of Planning and Implementation Cycles

    Science.gov (United States)

    Horne, Avril C.; Szemis, Joanna M.; Webb, J. Angus; Kaur, Simranjit; Stewardson, Michael J.; Bond, Nick; Nathan, Rory

    2018-03-01

    One important aspect of adaptive management is the clear and transparent documentation of hypotheses, together with the use of predictive models (complete with any assumptions) to test those hypotheses. Documentation of such models can improve the ability to learn from management decisions and supports dialog between stakeholders. A key challenge is how best to represent the existing scientific knowledge to support decision-making. Such challenges are currently emerging in the field of environmental water management in Australia, where managers are required to prioritize the delivery of environmental water on an annual basis, using a transparent and evidence-based decision framework. We argue that the development of models of ecological responses to environmental water use needs to support both the planning and implementation cycles of adaptive management. Here we demonstrate an approach based on the use of Conditional Probability Networks to translate existing ecological knowledge into quantitative models that include temporal dynamics to support adaptive environmental flow management. It equally extends to other applications where knowledge is incomplete, but decisions must still be made.

  13. Informing Environmental Water Management Decisions: Using Conditional Probability Networks to Address the Information Needs of Planning and Implementation Cycles.

    Science.gov (United States)

    Horne, Avril C; Szemis, Joanna M; Webb, J Angus; Kaur, Simranjit; Stewardson, Michael J; Bond, Nick; Nathan, Rory

    2018-03-01

    One important aspect of adaptive management is the clear and transparent documentation of hypotheses, together with the use of predictive models (complete with any assumptions) to test those hypotheses. Documentation of such models can improve the ability to learn from management decisions and supports dialog between stakeholders. A key challenge is how best to represent the existing scientific knowledge to support decision-making. Such challenges are currently emerging in the field of environmental water management in Australia, where managers are required to prioritize the delivery of environmental water on an annual basis, using a transparent and evidence-based decision framework. We argue that the development of models of ecological responses to environmental water use needs to support both the planning and implementation cycles of adaptive management. Here we demonstrate an approach based on the use of Conditional Probability Networks to translate existing ecological knowledge into quantitative models that include temporal dynamics to support adaptive environmental flow management. It equally extends to other applications where knowledge is incomplete, but decisions must still be made.

  14. Computer-aided waste management strategic planning and analysis

    International Nuclear Information System (INIS)

    Avci, H.I.; Kotek, T.J.; Koebnick, B.L.

    1995-01-01

    A computational model called WASTE-MGMT has been developed to assist in the evaluation of alternative waste management approaches in a complex setting involving multiple sites, waste streams, and processing options. The model provides the quantities and characteristics of wastes processed at any facility or shipped between any two sites as well as environmental emissions at any facility within the waste management system. The model input is defined by three types of fundamental waste management data: (1) waste inventories and characteristics at the point of generation; (2) treatment, storage, and disposal facility characteristics; and (3) definitions of alternative management approaches. The model has been successfully used in the preparation of the US Department of Energy (DOE) Environmental Management Programmatic.Environmental Impact Statement (EM PEIS). Certain improvements are either being implemented or planned that would extend the usefulness and applicability of the WASTE-MGMT model beyond the EM PEIS and info the. strategic planning for management of wastes under the responsibility of DOE or other agencies

  15. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R ampersand D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER ampersand WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT ampersand E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs

  16. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  17. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  18. 40 CFR 60.55c - Waste management plan.

    Science.gov (United States)

    2010-07-01

    ... management plan shall identify both the feasibility and the approach to separate certain components of solid... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Waste management plan. 60.55c Section 60.55c Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED...

  19. Water management, environmental protection and spatial planning reconciliation: "Accommodating" the Danube and the Tisa river in Serbia

    Directory of Open Access Journals (Sweden)

    Pihler Vladimir

    2013-01-01

    Full Text Available Water management in Serbia has been mostly operating in a framework of public companies and institutions focused on strictly sectorial and technical expertise on hydraulic engineering, environmental protection and navigable traffic engineering within the highly autonomous legislative framework. On the cross-point of spatial planning and water management there is a growing debate on the important discourses of the policy domains. Seeing rivers as an “accommodated” generator of opportunities is a statement which is opposing the traditional consideration of strict separation of water from the land. Spatial planning as a framework for regulating the land use has an important function in integrating the water management and landscape more closely. In Serbian spatial planning practice there is growing practice of area-specific development planning (reflected through the Spatial plans for the special-purpose areas which are considered to accommodate new ideas on spatiality better than the traditional, sectorial planning documents. The question is placed as to how these practices could direct new spatial arrangements of integrative collaborative spatial planning and not just merely reflect the framework of the existing planning order. This paper seeks the potential and actual role of spatial planning in addressing challenges related to particular river environments on the Tisa and the Danube rivers. The research is based on the analysis of two Spatial plans for the special-purpose areas which are still in conceptual phase - The Cultural landscape of Bač and Multifunctional ecological corridor of the Tisa river.

  20. Nuclear Materials Stewardship Within the DOE Environmental Management Program

    International Nuclear Information System (INIS)

    Bilyeu, J. D.; Kiess, T. E.; Gates, M. L.

    2002-01-01

    The Department of Energy (DOE) Environmental Management (EM) Program has made significant progress in planning disposition of its excess nuclear materials and has recently completed several noteworthy studies. Since establishment in 1997, the EM Nuclear Material Stewardship Program has developed disposition plans for excess nuclear materials to support facility deactivation. All nuclear materials have been removed from the Miamisburg Environmental Management Project (Mound), and disposition planning is nearing completion for the Fernald Environmental Management Project and the Rocky Flats Environmental Technology Site. Only a few issues remain for materials at the Hanford and Idaho sites. Recent trade studies include the Savannah River Site Canyons Nuclear Materials Identification Study, a Cesium/Strontium Management Alternatives Trade Study, a Liquid Technical Standards Trade Study, an Irradiated Beryllium Reflectors with Tritium study, a Special Performance Assessment Required Trade Study, a Neutron Source Trade Study, and development of discard criteria for uranium. A Small Sites Workshop was also held. Potential and planned future activities include updating the Plutonium-239 storage study, developing additional packaging standards, developing a Nuclear Material Disposition Handbook, determining how to recover or dispose of Pu-244 and U-233, and working with additional sites to define disposition plans for their nuclear materials

  1. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    International Nuclear Information System (INIS)

    1997-01-01

    This Environmental Monitoring Plan was prepared for the US Department of Energy's (DOE's) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan's purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner

  2. Environmental Management Waste Management Facility (EMWMF) Site-Specific Health and Safety Plan, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Flynn, N.C. Bechtel Jacobs

    2008-04-21

    The Bechtel Jacobs Company LLC (BJC) policy is to provide a safe and healthy workplace for all employees and subcontractors. The implementation of this policy requires that operations of the Environmental Management Waste Management Facility (EMWMF), located one-half mile west of the U.S. Department of Energy (DOE) Y-12 National Security Complex, be guided by an overall plan and consistent proactive approach to environment, safety and health (ES&H) issues. The BJC governing document for worker safety and health, BJC/OR-1745, 'Worker Safety and Health Program', describes the key elements of the BJC Safety and Industrial Hygiene (IH) programs, which includes the requirement for development and implementation of a site-specific Health and Safety Plan (HASP) where required by regulation (refer also to BJC-EH-1012, 'Development and Approval of Safety and Health Plans'). BJC/OR-1745, 'Worker Safety and Health Program', implements the requirements for worker protection contained in Title 10 Code of Federal Regulations (CFR) Part 851. The EMWMF site-specific HASP requirements identifies safe operating procedures, work controls, personal protective equipment, roles and responsibilities, potential site hazards and control measures, site access requirements, frequency and types of monitoring, site work areas, decontamination procedures, and outlines emergency response actions. This HASP will be available on site for use by all workers, management and supervisors, oversight personnel and visitors. All EMWMF assigned personnel will be briefed on the contents of this HASP and will be required to follow the procedures and protocols as specified. The policies and procedures referenced in this HASP apply to all EMWMF operations activities. In addition the HASP establishes ES&H criteria for the day-to-day activities to prevent or minimize any adverse effect on the environment and personnel safety and health and to meet standards that define acceptable

  3. Hanford Waste Management Plan, 1987

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Hanford Waste Management Plan (HWMP) is to provide an integrated plan for the safe storage, interim management, and disposal of existing waste sites and current and future waste streams at the Hanford Site. The emphasis of this plan is, however, on the disposal of Hanford Site waste. The plans presented in the HWMP are consistent with the preferred alternative which is based on consideration of comments received from the public and agencies on the draft Hanford Defense Waste Environmental Impact Statement (HDW-EIS). Low-level waste was not included in the draft HDW-EIS whereas it is included in this plan. The preferred alternative includes disposal of double-shell tank waste, retrievably stored and newly generated TRU waste, one pre-1970 TRU solid waste site near the Columbia River and encapsulated cesium and strontium waste

  4. Application of remote sensing to environmental management

    Energy Technology Data Exchange (ETDEWEB)

    Handley, J F

    1980-01-01

    The contribution of remote sensing to environmental management procedures at the sub-regional scale is examined in relation to the County Structure environmental management plan for Merseyside County, England. The various seasons, scales and emulsions used for aerial photography in the county are indicated, and results of aerial surveys of the distribution of derelict and despoiled land and of natural environments are presented and compared with ground surveys. The use of color infrared and panchromatic aerial photographs indicating areas of environmental stress and land use in the formulation, implementation and monitoring of environmental management activities is then discussed.

  5. Parking management : strategies, evaluation and planning

    International Nuclear Information System (INIS)

    Litman, T.A.

    2006-01-01

    Parking facilities are a major cost to society. Current planning practices are based on the assumption that parking should be abundant and provided free, with costs borne indirectly. This report examined parking management strategies related to integrated parking plans. Problems with current parking planning practices were reviewed. The costs of parking facilities were examined, as well as the savings that can accrue from improved management techniques. Strategies included shared parking; remote parking and shuttle services; walking and cycling improvements; improved enforcement and control; and increasing the capacity of existing parking facilities. Parking pricing methods, financial incentives and parking tax reforms were reviewed. Issues concerning user information and marketing were examined. Overflow parking plans were evaluated. Three illustrative examples of parking management programs were outlined, along with details of implementation, planning and evaluation procedures. It was concluded that cost-effective parking management programs can often reduce parking requirements by 20 to 40 per cent compared with conventional planning requirements, in addition to providing economic, social and environmental benefits. 32 refs., 7 tabs., 3 figs

  6. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  7. Uranium Mill Tailings Remedial Action Project Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Department of Energy (DOE) has issued requirements for complying with DOLE and other Federal agency environmental regulations. DOE Order 5400.1 requires environmental monitoring plans for each DOE operation that uses, generates, releases, or manages pollutants of radioactive and hazardous materials

  8. Consideration of Environmental Factors in Planning and Development of Urban Areas

    Science.gov (United States)

    Kustysheva, I.

    2017-11-01

    Environmental factors, in varying degrees, always have a direct influence on the urban environment formation and the provision of favorable and safe conditions for the life of the population. Their role in the planning and development of urban areas remains an integral part of the management of such areas. Management should be aimed at improving the efficiency of use of the territories and ecological environment improvement. Planning must be done with the consideration of identified ecological processes in cities on the basis of the information about their occurrence in the past and present. Currently, cities face a multitude of problems that require urgent and immediate solutions. One of the most important issues is the poor state of the urban environment, so the environmental factors remain one of the most critical problems that should be considered by the authorities while implementing the urban areas’ development plans. The article discusses the role of environmental factors in the management and planning of urban territories by the example of the city of Tobolsk.

  9. Project Management Plan for the INEL technology logic diagrams

    International Nuclear Information System (INIS)

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ''Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG ampersand G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project

  10. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1994-06-01

    Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities

  11. Final environmental impact statement for the Nevada Test Site and off-site locations in the State of Nevada. Framework for the resource management plan, Volume 2

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this document is to publicize how the U.S. Department of Energy Nevada Operations Office (DOE/NV) proposes to develop and use a Resource Management Plan for the Nevada Test Site (NTS) so the public could comment on and assist in the following activities: (1) Developing the methods for creating and using the plan; (2) Identifying the values people place on manmade and natural resources found on the NTS; (3) Developing the goals the DOE/NV will use to guide the conservation and use of those resources; (4) Identifying the management actions needed to meet constraints and resource management goals; and (5) Incorporating the principles of ecosystem management into land and resource management on the NTS. This framework for the Resource Management Plan was developed in conjunction with the Environmental Impact Statement for the Nevada Test Site and off-site locations in the state of Nevada (NTS EIS) to take advantage of the extensive data collection and public participation activities associated with the National Environmental Policy Act. After public input was received during the comment period for the Draft NTS EIS, DOE/NV revised this description of the Resource Management Plan and published it with the NTS Final EIS. This revision includes the goals DOE/NV has developed for managing resources and land-use constraints. It also includes the final plans for developing the Resource Management Plan. These plans will guide DOE/NV as it develops a Resource Management Plan in the coming years

  12. Data management plan for the Oak Ridge Environmental Information System, Version 1.1. Enviornmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-04

    The Data Management Plan (DMP) describes the data management objectives, system components, data base structure and contents, system maintenance, data processing, and user interface for the prototype phase of the Oak Ridge Environmental Information System (OREIS). The major goals of OREIS data management are to compile data of known quality, to maintain the integrity of the data base, and to provide data to users. The DMP defines the requirements, describes the responsibilities, and references the procedures for meeting the data management objectives. Emphasis is on management of measurement data and the associated metadata used to support its proper interpretation and legal defensibility. The DMP covers transmittal, processing, storage, and data access activities associated with OREIS. The OREIS data dictionary is provided as an appendix.

  13. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  14. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed...... over a range of years, institutional set-up and procedures have been adapted to these. The Water Framework Directive imposes a specific ecosystem oriented management approach, which directs planning to the fulfilment of objectives linked to specific water bodies, and an emphasis on the involvement...... of stakeholders and citizens. Institutional scholars point out that such an eco-system based approach superimposed on an existing institutional set-up for spatial planning and environmental management may create implementation problems due to institutional misfit (Moss 2004). A need for adaptation of procedures...

  15. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  16. Savannah River Site environmental implementation plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  17. Environmental implementation plan

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1994-01-01

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities

  18. Environmental considerations in mine closure planning

    International Nuclear Information System (INIS)

    Ricks, G.

    1997-01-01

    Mine closure planning considers the best ways to plan and manage the environmental changes and socio-economic effects associated with the closing of mines. While the criteria for judging successful closures may vary, it is particularly important for physical, chemical and biological stability to be achieved and for final land use to be appropriate. Trust funds are increasingly favoured as a practical means of fulfilling the requirement for a financial surety and of ensuring that financial provision is available at the end of the mine's life. (author)

  19. Environment, Safety, Health and Waste Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Feed Materials Production Center (FMPC) is the production of high qaulity uranium metal for use by the US Department of Energy (DOE) in Defense Programs. In order to accomplish this mission and to maintain the FMPC as a viable facility in the DOE production complex, the facility must be brought into full compliance with all federal and state regulations and industry standards for environmental protection and worker safety. Where past practices have resulted in environmental insult, a comprehensive program of remediation must be implemented. The purpose of this combined Environment, Safety, Health and Waste Management Plan is to provide a road map for achieving needed improvements. The plan is structured to provide a comprehensive projection from the current fiscal year (FY) through FY 1994 of the programs, projects and funding required to achieve compliance. To do this, the plan is subdivided into chapters which discuss the applicable regulations;project schedules and funding requirements;details of the various programs for environment, safety, health and waste management;details of the ongoing National Environmental Policy Act (NEPA);the quality assurance program and the environmental monitoring program. 14 refs., 30 figs., 29 tabs

  20. Savannah River Site Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  1. Savannah River Site Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  2. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  3. Environmental implementation plan: Chapter 5, Chemical management, pollution prevention and other compliance programs

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1993-01-01

    Compliance with environmental regulations and US Department of Energy Orders (DOE) relating to environmental protection is an important part of SRS's program. Over the past few years, the number of environmental regulations has increased. The strategy to comply with new and existing environmental regulations and DOE orders is described in chapter two. In this chapter, the following environmental programs are described: Toxic Substances Control Act (TSCA); Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA); Emergency Planning and Community Right-to-Know Act (EPCRA); and SPCC/BMP/Pollution Prevention Plans;The implementation section identifies issues and those responsible to achieve defined objectives

  4. 78 FR 7391 - Motorized Travel Management Plan, Tonto National Forest; Gila, Maricopa, Pinal, and Counties, AZ

    Science.gov (United States)

    2013-02-01

    ... point that environmental analysis for travel management under an Environmental Impact Statement (EIS... DEPARTMENT OF AGRICULTURE Forest Service Motorized Travel Management Plan, Tonto National Forest... for motorized vehicle use, thereby developing a motorized travel management plan. Such a plan is...

  5. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    1993-01-01

    Lawrence Berkeley Laboratory's Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department's activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A

  6. Fiscal year 1990 Rocky Flats Plant environmental restoration program current-year work plan

    International Nuclear Information System (INIS)

    Nielsen, T.; Waage, E.; Miller, D.

    1990-01-01

    This paper reports on the FY90 Current Year Work Plan (CYWP), intended to serve as a guiding document with which the Environmental Restoration and RCRA Compliance programs will be implemented at the Rocky Flats Plant, The Current Year Work Plan document serves to provide in one single document any cross-references necessary to understand how the DOE Five Year Plan, Site Specific Plan, or any other related documents fit into the Current Year Work Plan for the Rocky Flats Environmental Restoration. The scope of this paper will compare the planned Fiscal Year 1990 environmental restoration activities to those actually achieved at the end of the fiscal year. The DOE Headquarters (HQ) issued the Environmental Restoration and Waste Management (ER/WM) Five-Year Plan (FYP). The purpose of the FYP is to establish an agenda for compliance and cleanup against which progress will be measured. The Five Year Plan has been updated to include the Colorado Department of Health (CDH), Evironmental Protection Agency (EPA), and Department of Energy (DOE) Inter Agency Agreement Environmental Restoration activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. It also addresses facilities and sites contaminated with or used in the management of those wastes

  7. Environmentalism and land use planning

    Energy Technology Data Exchange (ETDEWEB)

    Alonso, P A.G.

    1986-01-01

    This dissertation considers the research question: Can land-use planning attain the goals of environmentalism. The research question instigates the development of models for environmentalism and land use planning, test of their congruence, analysis of institutional means to joint them, case study of the specific method of lifestyle zoning for Nature conservation, international comparisons, and suggestions for the implementation of the ideology of environmentalism by the techniques of land-use planning. Comparison among the industrially advanced anglophone countries of Australia, Canada, Great Britain and the United States of America enable cross-cultural insight into environmentalism, land-use planning, and measures for the protection of dedicated areas. The evaluation of the fit between environmentalism and land-use planning considers their origins, values, operating principles, programs and problems. The ideological outline of contemporary environmental planning provides a framework for detailed analysis of the case study of an Environmental Living Zone on the fringe of urban Melbourne, Australia. Historical research, interpretation of planning schemes, maps and aerial photographs, interviews, and observation provided insight into the social and environmental factors in residential conservation. From the empirical and theoretical analyses, the work suggests implications for practitioners and directions for further research.

  8. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    Energy Technology Data Exchange (ETDEWEB)

    Naidu, J.R.; Paquette, D.; Lee, R. [and others

    1996-10-01

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities.

  9. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    International Nuclear Information System (INIS)

    Naidu, J.R.; Paquette, D.; Lee, R.

    1996-01-01

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities

  10. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    International Nuclear Information System (INIS)

    Fritz, R.L.

    1995-01-01

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities

  11. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Fritz, R.L.

    1995-01-11

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities.

  12. Savannah River Site nuclear materials management plan FY 2017-2031

    Energy Technology Data Exchange (ETDEWEB)

    Magoulas, V. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-06-22

    The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclear Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.

  13. Environmental aspects of contingency planning and spill response

    International Nuclear Information System (INIS)

    Hillman, S.O.

    1993-01-01

    Alyeska Pipeline Service Company has implemented an incident command system (ICS) for crisis management within the company for response to spills at all company facilities including the Valdez Marine Terminal. The system is also used by Alyeska acting as the initial response contractor for TAPS laden tankers within Prince William Sound. During the past three years, Alyeska has undertaken a complete review of the spill prevention and response plans for these areas. This poster session focuses on the environmental aspects of the response planning efforts. Information is available on contingency planning updates in the areas of dispersant use, burning as a response tool, bioremediation of marine oil spills, waste management, permitting, coastal resource and sensitive habitat data base, and wildlife protection and management. All of these subjects are addressed in the resource documents (RD) supplementing the contingency plans. The RD revisions have been a coordinated effort, involving operators, agencies, and the public through the citizen advisory group

  14. Standard Guide for Environmental Monitoring Plans for Decommissioning of Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This guide covers the development or assessment of environmental monitoring plans for decommissioning nuclear facilities. This guide addresses: (1) development of an environmental baseline prior to commencement of decommissioning activities; (2) determination of release paths from site activities and their associated exposure pathways in the environment; and (3) selection of appropriate sampling locations and media to ensure that all exposure pathways in the environment are monitored appropriately. This guide also addresses the interfaces between the environmental monitoring plan and other planning documents for site decommissioning, such as radiation protection, site characterization, and waste management plans, and federal, state, and local environmental protection laws and guidance. This guide is applicable up to the point of completing D&D activities and the reuse of the facility or area for other purposes.

  15. Environmental considerations in physical planning in Norway and Poland

    Energy Technology Data Exchange (ETDEWEB)

    Naess, P; Saglie, I L; Glowacki, W; Dunin-Woyseth, H

    1998-12-31

    As a part of an agreement on environmental cooperation between Norway and Eastern Europe, a comparative case study was carried out of environmental considerations in physical planning since 1968 in the Norwegian municipality of Sandefjord and the Polish municipality of Myslenice. This report discusses the final results. Land use planning is surprisingly similar in the two countries. In both, the plans emphasize the protection of farmland and scarce biotopes as well as sewage management. In Myslenice, a major concern has been cultural heritage and cultural landscapes while in Sandefjord attention was paid more to natural areas for outdoor recreation. In both cases there has been little focus on energy conservation and the concept of sustainable development has hardly been discussed. The plans have been considerably influenced by national environmental policies. The type of political system, capitalism vs. state socialism, has indirectly influenced the amount of construction and hence the pace of conversion of undeveloped land, but does not appear to have had much impact on the environmental content of the plans. The emphasis laid on various environmental issues in part reflects the actual local challenges, but also cross-national cultural differences and the fact that during the period the environmental agenda has been widened in both municipalities, most clearly seen in the case of Sandefjord. The plans seem to have been considerably influenced by professional ideals, knowledge and methods common among planners across national boundaries. 52 refs., 1 figure, 2 tabs.

  16. Environmental considerations in physical planning in Norway and Poland

    Energy Technology Data Exchange (ETDEWEB)

    Naess, P.; Saglie, I.L.; Glowacki, W.; Dunin-Woyseth, H.

    1997-12-31

    As a part of an agreement on environmental cooperation between Norway and Eastern Europe, a comparative case study was carried out of environmental considerations in physical planning since 1968 in the Norwegian municipality of Sandefjord and the Polish municipality of Myslenice. This report discusses the final results. Land use planning is surprisingly similar in the two countries. In both, the plans emphasize the protection of farmland and scarce biotopes as well as sewage management. In Myslenice, a major concern has been cultural heritage and cultural landscapes while in Sandefjord attention was paid more to natural areas for outdoor recreation. In both cases there has been little focus on energy conservation and the concept of sustainable development has hardly been discussed. The plans have been considerably influenced by national environmental policies. The type of political system, capitalism vs. state socialism, has indirectly influenced the amount of construction and hence the pace of conversion of undeveloped land, but does not appear to have had much impact on the environmental content of the plans. The emphasis laid on various environmental issues in part reflects the actual local challenges, but also cross-national cultural differences and the fact that during the period the environmental agenda has been widened in both municipalities, most clearly seen in the case of Sandefjord. The plans seem to have been considerably influenced by professional ideals, knowledge and methods common among planners across national boundaries. 52 refs., 1 figure, 2 tabs.

  17. Social Impact Management Plans: Innovation in corporate and public policy

    Energy Technology Data Exchange (ETDEWEB)

    Franks, Daniel M., E-mail: d.franks@uq.edu.au [Centre for Social Responsibility in Mining, The University of Queensland, Sustainable Minerals Institute, St Lucia, Brisbane, Queensland 4072 (Australia); Vanclay, Frank, E-mail: frank.vanclay@rug.nl [Department of Cultural Geography, Faculty of Spatial Sciences, The University of Groningen, P.O. Box 800, 9700 AV Groningen (Netherlands)

    2013-11-15

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community.

  18. Social Impact Management Plans: Innovation in corporate and public policy

    International Nuclear Information System (INIS)

    Franks, Daniel M.; Vanclay, Frank

    2013-01-01

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community.

  19. Design and methodology for calculating the environmental pressure index as a tool for environmental land planning: the case of Cundinamarca

    International Nuclear Information System (INIS)

    Camacho O, Juana; Burgos S, Javier Dario

    2006-01-01

    The aim of this work is to provide a practical tool to carry out environmental planning and management processes regarding the use of space, in a complex way including not only biophysical but socioeconomic criteria. In the context of river basin management the Environmental Social Pressure Index was created. This paper presents an Environmental Planning and Management definition, based on the Ecological Supporting Structure, as well as one of sustainability, worked out of several authors. This work offers the methodological sequence to design and calculate a customized Environmental Social Pressure Index according to the specific features of any given territory, using the conceptual framework developed earlier and the multivariate analysis and power laws tools. Finally we present an exercise to illustrate this process, developed for Cundinamarca for 1995

  20. Environmental management strategy: four forces analysis.

    Science.gov (United States)

    Doyle, Martin W; Von Windheim, Jesko

    2015-01-01

    We develop an analytical approach for more systematically analyzing environmental management problems in order to develop strategic plans. This approach can be deployed by agencies, non-profit organizations, corporations, or other organizations and institutions tasked with improving environmental quality. The analysis relies on assessing the underlying natural processes followed by articulation of the relevant societal forces causing environmental change: (1) science and technology, (2) governance, (3) markets and the economy, and (4) public behavior. The four forces analysis is then used to strategize which types of actions might be most effective at influencing environmental quality. Such strategy has been under-used and under-valued in environmental management outside of the corporate sector, and we suggest that this four forces analysis is a useful analytic to begin developing such strategy.

  1. Environmental Management Strategy: Four Forces Analysis

    Science.gov (United States)

    Doyle, Martin W.; Von Windheim, Jesko

    2015-01-01

    We develop an analytical approach for more systematically analyzing environmental management problems in order to develop strategic plans. This approach can be deployed by agencies, non-profit organizations, corporations, or other organizations and institutions tasked with improving environmental quality. The analysis relies on assessing the underlying natural processes followed by articulation of the relevant societal forces causing environmental change: (1) science and technology, (2) governance, (3) markets and the economy, and (4) public behavior. The four forces analysis is then used to strategize which types of actions might be most effective at influencing environmental quality. Such strategy has been under-used and under-valued in environmental management outside of the corporate sector, and we suggest that this four forces analysis is a useful analytic to begin developing such strategy.

  2. Environmental restoration and waste management

    International Nuclear Information System (INIS)

    Middleman, L.I.

    1989-01-01

    The purpose of this Five-Year Plan is to establish an agenda for compliance and cleanup against which progress will be measured. DOE is committed to an open and participatory process for developing a national priority system for expenditure of funds. This system will be based on scientific principles and risk reduction in terms that are understandable to the public. The Plan will be revised annually, with a five-year planning horizon. For FY 1991--1995, this Plan encompasses total program activities and costs for DOE Corrective Activities, Environmental Restoration, Waste Management Operations, and Applied R ampersand D. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. It also addresses facilities and sites contaminated with or used in the management of those wastes. The Plan does not include the Safety and Health Program (Office of the Assistant Secretary for Environment, Safety, and Health) or programs of the Office of Civilian Radioactive Waste Management. It does include the annual Defense Programs contribution to the Nuclear Waste Fund for disposal of defense high-level waste and research toward characterizing the defense waste form for repository disposal

  3. 25 CFR 166.311 - Is an Indian agricultural resource management plan required?

    Science.gov (United States)

    2010-04-01

    ... holistic management objectives; and (5) Identify actions to be taken to reach established objectives. (c... 25 Indians 1 2010-04-01 2010-04-01 false Is an Indian agricultural resource management plan... WATER GRAZING PERMITS Land and Operations Management Management Plans and Environmental Compliance § 166...

  4. 2002 Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2002-01-01

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance

  5. South African small and medium-sized enterprise owners’ intention to implement an environmental management system

    Directory of Open Access Journals (Sweden)

    Fredrika (Miemie W. Struwig

    2017-06-01

    Aim: This article investigates South African small and medium-sized enterprise (SME owners’ intentions to implement an environmental management system based on the theory of planned behaviour. Setting: Although large businesses are clearly of interest with respect to their environmental management, especially given their prominence in many of the most environmentally impactful sectors, the relative neglect of the environmental management of SMEs is disconcerting, given their overall importance in most economies. In addition, very little research used the theory of planned behaviour to empirically test SME owners’ intentions, to implement an environmental management system. Method: A quantitative survey was used to collect primary data from 326 SME owners by a structured questionnaire. Results: Regression analysis results confirmed the influence of SME owners’ attitudes towards an environmental management system and pro-environmental norms on their intention to implement an environmental management system. Perceived behavioural control, however, did not significantly influence the SME owners’ intention to implement an environmental management system. Conclusion: These findings provide valuable insights into the implementation of environmental management systems among South African SMEs. The theory of planned behaviour also seems to be an appropriate means to investigate the intentions of SMEs to implement an environmental management system.

  6. Environmental Restoration and Waste Management (EM) program: An introduction

    International Nuclear Information System (INIS)

    1990-12-01

    This booklet introduces the reader to the mission and functions of a major new unit within the US Department of Energy (DOE): the Office of Environmental Restoration and Waste Management (EM). The Secretary of Energy established EM in November 1989, implementing a central purpose of DOE's first annual Environmental Restoration and Waste Management Five-Year Plan, which had appeared three months earlier. The contents of this booklet, and their arrangement, reflect the annual update of the Five-Year Plan. The Five-Year Plan supports DOE's strategy for meeting its 30-year compliance and cleanup goal. This strategy involves: focusing DOE's activities on eliminating or reducing known or recognized potential risks to worker and public health and the environment, containing or isolating, removing, or detoxifying onsite and offsite contamination, and developing technology to achieve DOE's environmental goals

  7. Detailed oil spill contingency analysis in establishment of preparedness plans for exploration drilling in environmentally sensitive areas: an integrated management process

    Energy Technology Data Exchange (ETDEWEB)

    Spikkerud, Cathrine S.; Skeie, Geir Morten; Brude, Odd Willy; Gravir, Gjermund [DNV Managing Risk, Oslo (Norway)

    2008-07-01

    This paper describes the integrated management process leading up to a dynamic oil spill preparedness plan based on detailed analysis of oil spill contingency requirements and environmental risk in environmentally sensitive areas. Starting with a detailed environmental risk and oil spill contingency analysis, oil spill preparedness plans are developed. These plans are generic for the area possibly affected by an oil spill, and are developed in detail for environmental 'hot spots' that are highly challenging in terms of oil spill response. The detailed plans make use of detailed data sets on shoreline substrate sensitivities and cleanup methodology, photographic inventory, logistical issues and access to real-time incident data for important areas. This detailed approach ensures sufficient knowledge about the sensitive area in advance to provide fast and correct strategic and tactical operational recovery decisions. A final element of the integrated process is a web based GIS, providing all parties involved with one common situation overview, ensuring that the facts remain in focus throughout the operation and that those responsible for informing stake-holders have access to correct and timely updated information. (author)

  8. The EPA-Wide Plan to Provide Solid Waste Management Capacity Assistance to Tribes

    Science.gov (United States)

    This Plan is a strategy for building tribal capacity to manage solid waste. The Plan promotes the development and implementation of integrated waste management plans and describes how EPA will prioritize its resources to maximize environmental benefits.

  9. The hydrographic basin a space for the environmental planning

    International Nuclear Information System (INIS)

    Dunoyer Mejia Monica

    2002-01-01

    This paper is a synthesis of the work done in watershed management in the framework of sustainable development in Caldas, it describes different points of view to the watershed management approaches as well as its legal aspects developed in the recent history of Colombia. You will also find different basins delineations according to the size, spatial scale used, and the proposed objectives to achieve different goals in watershed management as a way to do environmental planning. At the end of this paper you will find a description of the methodological faces used to achieve a so-called ordering plan, based on legal. Parameters used to date in Colombia

  10. Applying comprehensive environmental assessment to research planning for multiwalled carbon nanotubes: Refinements to inform future stakeholder engagement.

    Science.gov (United States)

    Powers, Christina M; Grieger, Khara; Meacham, Connie A; Gooding, Meredith Lassiter; Gift, Jeffrey S; Lehmann, Geniece M; Hendren, Christine O; Davis, J Michael; Burgoon, Lyle

    2016-01-01

    Risk assessments and risk management efforts to protect human health and the environment can benefit from early, coordinated research planning by researchers, risk assessors, and risk managers. However, approaches for engaging these and other stakeholders in research planning have not received much attention in the environmental scientific literature. The Comprehensive Environmental Assessment (CEA) approach under development by the United States Environmental Protection Agency (USEPA) is a means to manage complex information and input from diverse stakeholder perspectives on research planning that will ultimately support environmental and human health decision making. The objectives of this article are to 1) describe the outcomes of applying lessons learned from previous CEA applications to planning research on engineered nanomaterial, multiwalled carbon nanotubes (MWCNTs) and 2) discuss new insights and refinements for future efforts to engage stakeholders in research planning for risk assessment and risk management of environmental issues. Although framed in terms of MWCNTs, this discussion is intended to enhance research planning to support assessments for other environmental issues as well. Key insights for research planning include the potential benefits of 1) ensuring that participants have research, risk assessment, and risk management expertise in addition to diverse disciplinary backgrounds; 2) including an early scoping step before rounds of formal ratings; 3) using a familiar numeric scale (e.g., US dollars) versus ordinal rating scales of "importance"; 4) applying virtual communication tools to supplement face-to-face interaction between participants; and 5) refining criteria to guide development of specific, actionable research questions. © 2015 SETAC.

  11. Integrating Energy and Environmental Management in Wood Furniture Industry

    Science.gov (United States)

    Babić, Milun; Jelić, Dubravka; Konćalović, Davor; Vukašinović, Vladimir

    2014-01-01

    As energy costs continue to rise, industrial plants (even those of energy nonintensive industries such as furniture industry) need effective way to reduce the amount of energy they consume. Besides, there are a number of economic and environmental reasons why a company should consider environmental management initiatives. This paper provides a detailed guideline for implementing joint energy and environmental management system in wood furniture industrial company. It covers in detail all essential aspects of the system: initial system assessment, organization, policy development, energy and environmental auditing, action plan development, system promotion, checking system performance, and management review. PMID:24587734

  12. Integrating energy and environmental management in wood furniture industry.

    Science.gov (United States)

    Gordić, Dušan; Babić, Milun; Jelić, Dubravka; Konćalović, Davor; Vukašinović, Vladimir

    2014-01-01

    As energy costs continue to rise, industrial plants (even those of energy nonintensive industries such as furniture industry) need effective way to reduce the amount of energy they consume. Besides, there are a number of economic and environmental reasons why a company should consider environmental management initiatives. This paper provides a detailed guideline for implementing joint energy and environmental management system in wood furniture industrial company. It covers in detail all essential aspects of the system: initial system assessment, organization, policy development, energy and environmental auditing, action plan development, system promotion, checking system performance, and management review.

  13. 76 FR 33341 - Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning Area...

    Science.gov (United States)

    2011-06-08

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORE00000 L63500000.DO0000.LXSS021H0000.HAG11-0203] Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning... Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with the National Environmental Policy...

  14. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part B

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities.

  15. Checklist for Reviewing EPA Quality Management Plans

    Science.gov (United States)

    This checklist will be used to review the Quality Management Plans (QMPs) that are submitted to the Quality Staff of the Office of Environmental Information (OEI) for Agency review under EPA Order 5360.1 A2.

  16. Deliberate opinion of the Environmental Authority on the national plan for the management of radioactive materials and wastes (2016-2018)

    International Nuclear Information System (INIS)

    2016-01-01

    In its first part, this document presents the context of national plans for the management of radioactive materials and wastes or PNGMDR (legal general principles, modalities of elaboration, framework), the project of PNGMDR for 2016-2018, its associated procedures, and the main environmental challenges noticed by the Environmental Authority. The second part proposes an analysis of the environmental assessment and notably explains the choice of this PNGMDR in terms of objectives for the environment, and with respect to other envisaged solutions. The third part describes how the PNGMDR takes the environment into account in terms of prevention, and of transverse environmental stakes. It also proposes an analysis in terms of material type and of wastes per sector (radioactive materials, wastes of different activity levels and life, residues, wastes with high natural radioactivity, management of historical sites). Two documents published by the IRSN, respectively on the environmental assessment of the PNGMDR and on a project of storage of low level and long life wastes are provided in appendix

  17. United States Department of Energy Richland Operations Office Environmental Protection Implementation Plan: November 9, 1993, to November 9, 1994

    International Nuclear Information System (INIS)

    1993-11-01

    The hub of today's programs at the Hanford Site are activities dedicated to managing stored and new wastes and cleanup of waste sites. To ensure focused planning and implementing efforts for these programs, management of the site is assigned to DOE's Office of Environmental Restoration and Waste Management. This report describes policies and procedures in the following areas: Compliance activities; Environmental restoration; Waste management; and Technology development. Procedures for notification of environmental occurrences, long-range environmental protection planning and reporting, waste management programs; environmental monitoring programs, and quality assurance and data verification are also described and discussed

  18. Long-term management plan INEL transuranic waste

    International Nuclear Information System (INIS)

    McKinney, J.D.

    1978-12-01

    The Idaho National Engineering Laboratory stores large quantities of transuranic-contaminated waste at its Radioactive Waste Management Complex. This report presents a 10-year plan for management of this transuranic waste and includes descriptions of projects involving nuclear waste storage, retrieval, processing, systems analysis, and environmental science. Detailed project schedules and work breakdown charts are provided to give the reader a clear view of transuranic waste management objectives

  19. United States Department of Energy Environmental Management Advisory Board: Public meeting

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-15

    This meeting of the Environmental Management Advisory Board was held to discuss environmental concerns that everybody has and to provide a strategy for dealing with the problems. Plans for the Environmental Management Programmatic Environmental Impact Statement are presented. A report is included of the subcommittee on institutional barriers to advanced technology use. The subcommittee on environmental restoration cost effectiveness also presents a report. The status of public involvement activities is evaluated. A presentation on the status of spent fuel management is included.

  20. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  1. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  2. Environmental Implementation Plan - EIP introduction

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1993-01-01

    Due to the commitment and participation of more than 100 professionals from site environmental coordinators, customer improvements and total quality are being incorporated into the Environmental Implementation Plan (EIP). The EIP is now a living document that communicates an overview of site environmental programs and the facility plans that are designed to protect the environment and meet changing regulatory requirements. Continuous improvement of environmental programs is enhanced through planned quarterly self-assessments during the open-quotes Reflectionsclose quotes process. Through the sharing of noteworthy practices, lessons learned, and ideas for improvement, the EIP provides a framework for environmental professionals to promote cost effective solutions and program improvements through teamwork and communication. These efforts were initiated by the Central Environmental Committee Executive Committee (CECEC) and developed and coordinated by the EIP subcommittee. The EIP revision process is the baseline for a continuous improvement cycle. Although the EIP is a Westinghouse Savannah River Company (WSRC) document, the environmental-planning process involves and will benefit all site contractors. Together, we are committed to a open-quotes Partnership in Environmental Excellence.close quotes

  3. Environmental Restoration and Waste Management (EM) program: An introduction

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    This booklet introduces the reader to the mission and functions of a major new unit within the US Department of Energy (DOE): the Office of Environmental Restoration and Waste Management (EM). The Secretary of Energy established EM in November 1989, implementing a central purpose of DOE's first annual Environmental Restoration and Waste Management Five-Year Plan, which had appeared three months earlier. The contents of this booklet, and their arrangement, reflect the annual update of the Five-Year Plan. The Five-Year Plan supports DOE's strategy for meeting its 30-year compliance and cleanup goal. This strategy involves: focusing DOE's activities on eliminating or reducing known or recognized potential risks to worker and public health and the environment, containing or isolating, removing, or detoxifying onsite and offsite contamination, and developing technology to achieve DOE's environmental goals.

  4. Environmental Restoration Program Control Management System

    International Nuclear Information System (INIS)

    Duke, R.T.

    1992-01-01

    Environmental Restoration managers need to demonstrate that their programs are under control. Unlike most industrial programs, the public is heavily involved in Environmental Restoration activities. The public is demanding that the country prove that real progress is being made towards cleaning up the environment. A Program Control Management System can fill this need. It provides a structure for planning, work authorization, data accumulation, data analysis and change control. But it takes time to implement a control system and the public is losing its patience. This paper describes critical items essential to the quick development and implementation of a successful control system

  5. Mound Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Bauer, L.R.; Tullis, M.S.; Paulick, R.P.; Roush, L.L.

    1994-07-01

    The purpose of this Environmental Monitoring Plan (EMP) is to describe the environmental monitoring and surveillance programs in place at Mound. The Plan is required by DOE Order 5400.1 (DOE, 1990). The programs described in the EMP are required by the DOE 5400 Order series and by the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environment Surveillance (DOE 1991a), referred to as the Regulatory Guide throughout this Plan

  6. Environmental Monitoring Plan for the Oak Ridge Reservation, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, Sharon D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-10-01

    The purpose of Oak Ridge Reservation (ORR) environmental surveillance is to characterize radiological and nonradiological conditions of the off-site environs and estimate public doses related to these conditions, confirm estimations of public dose based on effluent monitoring data, and, where appropriate, provide supplemental data to support compliance monitoring for applicable environmental regulations. This environmental monitoring plan (EMP) is intended to document the rationale, frequency, parameters, and analytical methods for the ORR environmental surveillance program and provides information on ORR site characteristics, environmental pathways, dose assessment methods, and quality management. ORR-wide environmental monitoring activities include a variety of media including air, surface water, vegetation, biota, and wildlife. In addition to these activities, site-specific effluent, groundwater, and best management monitoring programs are conducted at the Oak Ridge National Laboratory (ORNL), the Y-12 National Security Complex (Y-12), and the East Tennessee Technology Park (ETTP). This is revision 5.

  7. Environmental Development Plan (EDP). Enhanced gas recovery, FY 1977

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-01

    This Enhanced Gcs Recovery EDP addresses the environmental impacts of enhanced gas recovery processes in shale and sandstone, methane drainage from coalbeds, and methane recovery from geopressured aquifers. The EDP addresses planning in two basic areas: environmental research and environmental assessment. Environmental research can be categorized as follows: characterization of pollutants from EGR processes; selective application of monitoring and measuring techniques; evaluation of control/mitigation techniques; and evaluation of the synergistic impacts of the development of EGR techniques. Environmental assessment activities scheduled by EDP include: assessment of ecological impacts; assessment of socioeconomic effects; EIA/EIS preparation; evaluation of control technology needs; and analysis of applicable and proposed emission, effluent, and health and safety standards. The EGR EDP includes an EGR technology overview (Section 2), a discussion of EGR environmental issues and requirements (Section 3), an environmental action plan (Section 4), an environmental management strategy for the EGR program (Section 5), and supporting appendices which present information on Federal legislation applicable to EGR technology, a summary of ongoing and completed research, and future research and assessment projects.

  8. Environmental surveillance: An integral part of the spill contingency plan

    International Nuclear Information System (INIS)

    Salinas, J.; Bozzo, W.

    1993-01-01

    Typically, the initial response to spills is directed at containing, controlling, and stopping the flow of spilled materials. The primary goal of such a response is to limit the spread and further impact of spilled material, and to initiate timely cleanup and recovery of affected areas. Surveillance of actual spill impacts has often followed an after the fact approach, using only immediately available resources. Surveillance may occur quickly after a spill, but in most incidents its occurs as a follow-up action after initial response and containment have been achieved. Insufficient planning may produce spill surveillance that inadequately assesses impacts, fails to incorporate baseline data, and does not clearly identify a cleanup recovery and endpoint. The management and operations contractor for the US Dept. of Energy's Strategic Petroleum Reserve (SPR) conducts environmental surveillance activities in response to spill incidents when they occur at these facilities. These surveillance activities, when conducted as part of the response, are useful instruments in the initial assessment of spill incidents, management of spill response, containment, and cleanup activities, and for monitoring and documenting postspill impacts and recovery. An Environmental Surveillance Plan (ESP) incorporated in the SPR Spill Contingency Plan provides for initiation of environmental surveillance as part of the spill response. The ESP outlines, through alogic tree, conditions for activating the plan, key indicator parameters for evaluation, detailed methods for establishing surveillance stations, lists of key personnel, locations of equipment necessary to perform surveillance, and conditions for termination of environmental surveillance

  9. Integrated planning for regional development planning and water resources management under uncertainty: A case study of Xining, China

    Science.gov (United States)

    Fu, Z. H.; Zhao, H. J.; Wang, H.; Lu, W. T.; Wang, J.; Guo, H. C.

    2017-11-01

    Economic restructuring, water resources management, population planning and environmental protection are subjects to inner uncertainties of a compound system with objectives which are competitive alternatives. Optimization model and water quality model are usually used to solve problems in a certain aspect. To overcome the uncertainty and coupling in reginal planning management, an interval fuzzy program combined with water quality model for regional planning and management has been developed to obtain the absolutely ;optimal; solution in this study. The model is a hybrid methodology of interval parameter programming (IPP), fuzzy programing (FP), and a general one-dimensional water quality model. The method extends on the traditional interval parameter fuzzy programming method by integrating water quality model into the optimization framework. Meanwhile, as an abstract concept, water resources carrying capacity has been transformed into specific and calculable index. Besides, unlike many of the past studies about water resource management, population as a significant factor has been considered. The results suggested that the methodology was applicable for reflecting the complexities of the regional planning and management systems within the planning period. The government policy makers could establish effective industrial structure, water resources utilization patterns and population planning, and to better understand the tradeoffs among economic, water resources, population and environmental objectives.

  10. Environmental performance evaluation of Beijing's energy use planning

    International Nuclear Information System (INIS)

    Wang Lei; Xu Linyu; Song Huimin

    2011-01-01

    In line with rapid economic development, urban energy consumption is increasing rapidly, resulting in environmental problems. After considering several methods to evaluate the environmental performance of energy use, including: energy ecological footprint, input-output analysis, emergy-exergy analysis, and multi-criteria decision-making, an environmental performance evaluation model is proposed, which combines the analytical hierarchy process, fuzzy extent analysis, and membership degree analysis. In the model, 18 sub-indicators of environmental performance from energy use planning are classified into four categories: structure of energy use and industry, technology and efficiency of energy use, environmental impacts caused by energy use, and the socio-economic benefits of energy use. Membership degree analysis is applied to each indicator. Three energy use scenarios which are, respectively, environment-friendly, technology-led, and economic policy-led are evaluated. The results show that the technology-led energy use planning is best. The sustainable energy use policies are proposed from three aspects, including optimizing the energy use and industrial structure, encouraging development of energy-saving and air pollution control technologies, and enhancing legislation on energy use management. The policies are helpful to optimize the trade-offs between economic growth and environmental protection in Beijing. - Highlights: → Our paper establishes a system of indicators according to the structure of urban energy use planning. → We have created a comprehensive environmental performance evaluation model in the research. → The model and results can serve as an important basis for decision-making to guide local government.

  11. 10 CFR 1.41 - Office of Federal and State Materials and Environmental Management Programs.

    Science.gov (United States)

    2010-01-01

    ... Environmental Management Programs. (a) The Office of Federal and State Materials and Environmental Management...) The Office of Federal and State Materials and Environmental Management Programs— (1) Plans and directs... 10 Energy 1 2010-01-01 2010-01-01 false Office of Federal and State Materials and Environmental...

  12. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2009-0573; FRL-9146-5] Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District AGENCY: Environmental... South Coast Air Quality Management District (SCAQMD) portion of the California State Implementation Plan...

  13. Project management plan for exploratory shaft at Yucca Mountain

    International Nuclear Information System (INIS)

    1983-08-01

    This Project Management Plan (PMP) provides the basic guidance and describes the organizational structure and procedures for the design, construction, and testing of a large-diameter Exploratory Shaft (ES) in tuffaceous media as a major element within the Nevada Nuclear Waste Storage Investigations (NNWSI) project, which is a part of the National Waste Terminal Storage (NWTS) Program, US Department of Energy (DOE). The PMP encompasses activities identified as construction phase and in situ phase testing to be conducted from the ES through September 30, 1986. Specific topics addressed are the ES project objectives, the management organization and responsibilities, functional support requirements, work plan (including quality assurance aspects), work breakdown structure, milestone schedule, logic diagram, performance criteria, cost estimates, management control systems, procurement plan, test plan, and environmental, health and safety plans

  14. Hanford Site Environmental Management Specification

    International Nuclear Information System (INIS)

    DAILY, J.L.

    2001-01-01

    The US Department of Energy, Richland Operations Office (RL) has established a document hierarchy as part of its integrated management system. The Strategic Plan defines the vision, values, missions, strategic goals, high-level outcomes, and the basic strategies in achieving those outcomes. As shown in Figure 1-1, the Site Specification derives requirements from the Strategic Plan and documents the top-level mission technical requirements for the work involved in the RL Hanford Site cleanup and infrastructure activities under the responsibility of the U.S. Department of Energy, Office of Environmental Management (EM). It also provides the basis for all contract technical requirements. Since this is limited to the EM work, neither the Fast Flux Test Facility (FFTF) nor the Pacific Northwest National Laboratory (PNNL) non-EM science activities are included. Figure 1-1 also shows the relationship between this Site Specification and the other Site management and planning documents. Similarly, the documents, orders, and laws referenced in this document represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents

  15. Management plan for White Oak Dam. Revision 1

    International Nuclear Information System (INIS)

    Ahmed, S.B.

    1997-03-01

    The purpose is to provide operation and maintenance, periodic inspection, and emergency action plans for White Oak Dam in general accordance with the Federal Emergency Management Agency (FEMA) guidelines for dam safety. It must be understood that operations at the site are primarily for purposes of environmental monitoring, environmental protection and waste management operations control. Effluent is generally allowed to flow from the lake at its natural rate by rising above the broad crested weir notch elevation of 744 feet m.s.l

  16. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    International Nuclear Information System (INIS)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE's preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public's role in helping DOE and the EPA to make the final decision on a remedy

  17. Status of environmental technology; Interim Report to the sector study 'Petroleum and Energy', the integrated management plan for North Sea. Mapping of available environmental technology; Statusrapport for miljoeteknologi

    Energy Technology Data Exchange (ETDEWEB)

    2011-03-15

    The purpose of this report is to provide an overview of the current status of environmental technology that may help to prevent and reduce / prevent environmental pollution. The report is a foundation report to the management plan for the North Sea. The report was prepared based on the NPD's knowledge and with good input from the PSA, and resource persons in the oil companies. The following is given a summary of the various disciplines and the technological challenges the industry has managed to meet and which ones remain. (Author)

  18. Risk Management Plan (RMP) Facility Points, Region 9, 2011, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Risk Management Plan (RMP): Under the Clean Air Act, Section 112(r), the EPA established a program requiring risk management plans to be provided to the EPA by...

  19. Risk Management Plan (RMP) Facility Points, Region 9, 2014, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Risk Management Plan (RMP): Under the Clean Air Act, Section 112(r), the EPA established a program requiring risk management plans to be provided to the EPA by...

  20. Environmental Land Management in Tajikistan

    Science.gov (United States)

    Makhmudov, Zafar; Ergashev, Murod

    2015-04-01

    Tackling Environmental Land Management in Tajikistan "Project approach" Khayrullo Ibodzoda, Zafar Mahmoudov, Murod Ergashev, Kamoliddin Abdulloev Among 28 countries in Europe and Central Asia, Tajikistan is estimated to be the most vulnerable to the climate change impacts depending on its high exposure and sensitivity combined with a very low adaptive capacity. The agricultural sector of Tajikistan is subject to lower and more erratic rainfalls, as well as dryness of water resources due to the possible temperature rising in the region, high evaporation, reducing the accumulation of snow in the mountain glaciers and increased frequency of extreme events. Climate change and variability are likely to pose certain risks, especially for those who prefer natural agriculture or pasture management that just reinforces the need for sound, adapted to new climatic conditions and improved principles of land management. Adoption of new strategies and best practices on sustainable land and water management for agricultural ecosystems will help the farmers and communities in addressing the abovementioned problems, adapt and become more resilient to changing climate by increasing wellbeing of local population, and contributing to food security and restoring productive natural resources. The Environmental Land Management and Rural Livelihoods Project is being financed by the Pilot Program for Climate Resilience (PPCR) and Global Environment Facility (GEF). The Project goal is to enable the rural population to increase their productive assets by improving management of natural resources and building resilience to climate change in selected climate vulnerable sites. The project will facilitate introduction of innovative measures on land use and agricultural production by providing small grants at the village level and grants for the Pasture User Groups (PUGs) at jamoat level in order to implement joint plans of pasture management and wellbred livestock, also for the Water User

  1. Environmental Restoration and Waste Management (EM) program: An introduction

    International Nuclear Information System (INIS)

    1991-06-01

    This booklet introduces the reader to the mission and functions of a major unit within the US Department of Energy (DOE): the Office of Environmental Restoration and Waste Management (EM). The Secretary of Energy established EM in November 198, implementing the first step in fulfilling the central purpose of DOE's annually updated Environmental Restoration and Waste Management Five-Year Plan (FYP). The first FYP had been developed three months earlier. The contents of this booklet, and their arrangement, reflect (and will, it is hoped, serve as a kind of appetizer for) the annual update of the Five-Year Plan. The Five-Year Plan supports DOE's strategy for meeting its 30-year compliance and cleanup goal. This strategy involves: (1) focusing DOE's activities on eliminating or reducing known or recognized potential risks to workers, the public, and the environment; (2) containing or isolating, removing, or detoxifying onsite and offsite contamination; and (3) developing technology to achieve DOE's environmental goals. 101 refs

  2. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  3. Do Groundwater Management Plans Work? A statistical evaluation of the effectiveness of groundwater management plans towards achieving water supply and environmental objectives under a changing climate.

    Science.gov (United States)

    White, E.; Peterson, T. J.; Costelloe, J. F.; Western, A. W.; Carrara, E.

    2017-12-01

    Regulation of groundwater through the use of management plans is becoming increasingly prevalent as global groundwater levels decline. But plans are seldom systematically and quantitatively assessed for effectiveness. Instead, the state of an aquifer is commonly considered a proxy for plan effectiveness despite a lack of casaulity. Groundwater managers face myraid challenges such as finite resources, conflicting uses and the uncertainty inherent in any groundwater investigation. Groundwater models have been used to provide insights into what may happen to the aquifer under various levels of stress. Generally, these models simulate the impact of predefined stresses for a certain time-span. However, this is not how management occurs in reality. Managers only see a fraction of the aquifer and use this limited knowledgeto make aquifer-wide decisions. Also, management changes over time in response to aquifer state, and groundwater management plans commonly contain trigger levels in monitoring wells that prompt management intervention. In this way there is a feedback between the aquifer state and management that is rarely captured by groundwater management models. To capture this management/aquifer feedback, groundwater management was structured as a systems control problem, and using this framework, a testability assessment rubric developed. The rubric was applied to 15 Australian groundwater management plans and 47% of plans were found to be testable. To numerically quantify the effectiveness of groundwater managment, the impact of extraction restrictions was probabilistically assessed by simulating "the act of management" of a simple unconfined groundwater system using MODFLOW and Flopy. Water managers were privy only to head levels in a varying number of grid cells assigned as monitoring wells, and used that limited information to make allocation decisions at each time step. Extraction rates for each simulated management period were determined based upon the observed

  4. Implementation of the environmental management plan for the dismantling of nuclear powered submarines at Zvezdochka Shipyard, Russia

    International Nuclear Information System (INIS)

    Washer, M.; Cull, M.; Crocker, C.; Ivanov, V.; Shepurev, A.; Khan, B.U.Z.; Lee, M.; Gerchikov, M.

    2007-01-01

    Department of Foreign Affairs and International Trade Canada is funding the dismantling of twelve nuclear powered submarines (NPS) from the Russian Federation's Northern Fleet as part of the Global Partnership Initiative against weapons and materials of mass destruction. In this paper, work performed by Nuclear Safety Solutions Ltd. and its collaborators in support of these activities is described. First, an environmental impact assessment of towing and dismantling NPS in the Kola Peninsula, and the Barents and White Seas was performed. The assessed activities included: towing of NPS from Naval Bases in Murmansk Region to the Zvezdochka shipyard (Severodvinsk); defuelling of onboard reactors; dismantling of NPS at Zvezdochka; and waste management. The assessment helped identify mitigation measures that could prevent the occurrence of adverse effects. Next, the project team defined and implemented an environmental management plan (EMP) based on the shipyard's existing environmental policy and the mitigating measures identified during the environmental assessment. Specific targets were defined to track the progress of the EMP implementation, and are described in this paper. During the study period, three Victor Class NPS were dismantled at Zvezdochka. The major benefits realized include: removal and spent nuclear fuel assemblies; treatment/decontamination of liquid and solid radioactive waste; and the cultivation of collaboration between Russian and Western expertise. (author)

  5. Implementation of the environmental management plan for the dismantling of nuclear powered submarines at Zvezdochka shipyard, Russia

    International Nuclear Information System (INIS)

    Washer, M.; Cull, M.; Crocker, C.; Ivanov, V.; Shepurev, A.; Khan, B.U.Z.; Lee, M.; Gerchikov, M.

    2008-01-01

    Department of Foreign Affairs and International Trade Canada is funding the dismantling of twelve nuclear powered submarines (NPS) from the Russian Federation's Northern Fleet as part of the Global Partnership Initiative against weapons and materials of mass destruction. In this paper, work performed by Nuclear Safety Solutions Ltd. and its collaborators in support of these activities is described. First, an environmental impact assessment of towing and dismantling NPS in the Kola Peninsula, and the Barents and White Seas was performed. The assessed activities included: towing of NPS from Naval Bases in Murmansk Region to the Zvezdochka shipyard (Severodvinsk); defuelling of onboard reactors; dismantling of NPS at Zvezdochka; and waste management. The assessment helped identify mitigation measures that could prevent the occurrence of adverse effects. Next, the project team defined and implemented an environmental management plan (EMP) based on the shipyard's existing environmental policy and the mitigating measures identified during the environmental assessment. Specific targets were defined to track the progress of the EMP implementation, and are described in this paper. During the study period, three Victor Class NPS were dismantled at Zvezdochka. The major benefits realized include: removal of spent nuclear fuel assemblies; treatment/ decontamination of liquid and solid radioactive waste; and the cultivation of collaboration between Russian and Western expertise. (author)

  6. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Science.gov (United States)

    2010-04-16

    ... Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian... Impact Statement (FEIS) for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake... drought management planning at the Kerr Hydroelectric Project no sooner than 30 days following the...

  7. 76 FR 70483 - Environmental Impact Statement and General Management Plan, Paterson Great Falls National...

    Science.gov (United States)

    2011-11-14

    ... planning process and will remain actively involved throughout the development of the plan. Prepared by... the long-term management of Paterson Great Falls NHP early in the process through public meetings and... Impact Statement and General Management Plan, Paterson Great Falls National Historical Park, NJ AGENCY...

  8. Environmental Assessment of Possible Future Waste Management Scenarios

    Directory of Open Access Journals (Sweden)

    Yevgeniya Arushanyan

    2017-02-01

    Full Text Available Waste management has developed in many countries and will continue to do so. Changes towards increased recovery of resources in order to meet climate targets and for society to transition to a circular economy are important driving forces. Scenarios are important tools for planning and assessing possible future developments and policies. This paper presents a comprehensive life cycle assessment (LCA model for environmental assessments of scenarios and waste management policy instruments. It is unique by including almost all waste flows in a country and also allow for including waste prevention. The results show that the environmental impacts from future waste management scenarios in Sweden can differ a lot. Waste management will continue to contribute with environmental benefits, but less so in the more sustainable future scenarios, since the surrounding energy and transportation systems will be less polluting and also because less waste will be produced. Valuation results indicate that climate change, human toxicity and resource depletion are the most important environmental impact categories for the Swedish waste management system. Emissions of fossil CO2 from waste incineration will continue to be a major source of environmental impacts in these scenarios. The model is used for analyzing environmental impacts of several policy instruments including weight based collection fee, incineration tax, a resource tax and inclusion of waste in a green electricity certification system. The effect of the studied policy instruments in isolation are in most cases limited, suggesting that stronger policy instruments as well as combinations are necessary to reach policy goals as set out in for example the EU action plan on circular economy.

  9. Environmental Management System

    Science.gov (United States)

    Goals Recycling Green Purchasing Pollution Prevention Reusing Water Resources Environmental Management Stewardship » Environmental Protection » Environmental Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the

  10. Hanford Site environmental management specification

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L.

    1998-06-10

    The US Department of Energy, Richland Operations Office (RL) uses this Hanford Site Environmental Management Specification (Specification) to document top-level mission requirements and planning assumptions for the prime contractors involved in Hanford Site cleanup and infrastructure activities under the responsibility of the US Department of Energy, Office of Environmental Management. This Specification describes at a top level the activities, facilities, and infrastructure necessary to accomplish the cleanup of the Hanford Site and assigns this scope to Site contractors and their respective projects. This Specification also references the key National Environmental Policy Act of 1969 (NEPA), Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and safety documentation necessary to accurately describe the cleanup at a summary level. The information contained in this document reflects RL`s application of values, priorities, and critical success factors expressed by those involved with and affected by the Hanford Site project. The prime contractors and their projects develop complete baselines and work plans to implement this Specification. These lower-level documents and the data that support them, together with this Specification, represent the full set of requirements applicable to the contractors and their projects. Figure 1-1 shows the relationship of this Specification to the other basic Site documents. Similarly, the documents, orders, and laws referenced in this specification represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents.

  11. Hanford Site environmental management specification

    International Nuclear Information System (INIS)

    Grygiel, M.L.

    1998-01-01

    The US Department of Energy, Richland Operations Office (RL) uses this Hanford Site Environmental Management Specification (Specification) to document top-level mission requirements and planning assumptions for the prime contractors involved in Hanford Site cleanup and infrastructure activities under the responsibility of the US Department of Energy, Office of Environmental Management. This Specification describes at a top level the activities, facilities, and infrastructure necessary to accomplish the cleanup of the Hanford Site and assigns this scope to Site contractors and their respective projects. This Specification also references the key National Environmental Policy Act of 1969 (NEPA), Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and safety documentation necessary to accurately describe the cleanup at a summary level. The information contained in this document reflects RL's application of values, priorities, and critical success factors expressed by those involved with and affected by the Hanford Site project. The prime contractors and their projects develop complete baselines and work plans to implement this Specification. These lower-level documents and the data that support them, together with this Specification, represent the full set of requirements applicable to the contractors and their projects. Figure 1-1 shows the relationship of this Specification to the other basic Site documents. Similarly, the documents, orders, and laws referenced in this specification represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents

  12. CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    DAVIS, M.

    2005-04-01

    The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

  13. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R ampersand D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER ampersand WM) operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER ampersand WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER ampersand WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs

  14. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    International Nuclear Information System (INIS)

    Sebastian Puente

    1998-01-01

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics

  15. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Sebastian Puente

    1998-07-25

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics.

  16. Revealing Adaptive Management of Environmental Flows

    Science.gov (United States)

    Allan, Catherine; Watts, Robyn J.

    2018-03-01

    Managers of land, water, and biodiversity are working with increasingly complex social ecological systems with high uncertainty. Adaptive management (learning from doing) is an ideal approach for working with this complexity. The competing social and environmental demands for water have prompted interest in freshwater adaptive management, but its success and uptake appear to be slow. Some of the perceived "failure" of adaptive management may reflect the way success is conceived and measured; learning, rarely used as an indicator of success, is narrowly defined when it is. In this paper, we document the process of adaptive flow management in the Edward-Wakool system in the southern Murray-Darling Basin, Australia. Data are from interviews with environmental water managers, document review, and the authors' structured reflection on their experiences of adaptive management and environmental flows. Substantial learning occurred in relation to the management of environmental flows in the Edward-Wakool system, with evidence found in planning documents, water-use reports, technical reports, stakeholder committee minutes, and refereed papers, while other evidence was anecdotal. Based on this case, we suggest it may be difficult for external observers to perceive the success of large adaptive management projects because evidence of learning is dispersed across multiple documents, and learning is not necessarily considered a measure of success. We suggest that documentation and sharing of new insights, and of the processes of learning, should be resourced to facilitate social learning within the water management sector, and to help demonstrate the successes of adaptive management.

  17. HOLISTIC APPROACH TO ENVIRONMENTAL MANAGEMENT OF MUNICIPAL SOLID WASTE

    Science.gov (United States)

    The paper presents results from the application of a new municipal solid waste (MSW) management planning aid to EPA's new facility in the Research Triangle Park, NC. This planning aid, or decision support tool, is computer software that analyzes the cost and environmental impact ...

  18. Environmental marketing within organic agriculture system management

    OpenAIRE

    O. Shkuratov; V. Kyporenko

    2015-01-01

    This paper deals with economic content of environmental marketing in the management system organic agriculture that allows operators of organic market to effectively plan the production of organic agricultural products and ensure the optimal balance between social and economic indicators throughout the life cycle of the product. Structural-logical scheme on the formation of environmentally oriented motivation of organic agricultural products consumer behavior has been grounded.

  19. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978

    International Nuclear Information System (INIS)

    1976-01-01

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only

  20. Environmental Restoration Site-Specific Plan for the Paducah Gaseous Diffusion Plant, FY 93

    International Nuclear Information System (INIS)

    1993-01-01

    This report provides an overview of the major Environmental Restoration (ER) concerns at Paducah Gaseous Diffusion Plant (PGDP). The identified solid waste management units at PGDP are listed. In the Department of Energy (DOE) Five Year Plan development process, one or more waste management units are addressed in a series of activity data sheets (ADSs) which identify planned scope, schedule, and cost objectives that are representative of the current state of planned technical development for individual or multiple sites

  1. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement

    International Nuclear Information System (INIS)

    1994-06-01

    The US Department of Energy (DOE) has prepared this report to assist its management in making two decisions. The first decision, which is programmatic, is to determine the management program for DOE spent nuclear fuel. The second decision is on the future direction of environmental restoration, waste management, and spent nuclear fuel management activities at the Idaho National Engineering Laboratory. Volume 1 of the EIS, which supports the programmatic decision, considers the effects of spent nuclear fuel management on the quality of the human and natural environment for planning years 1995 through 2035. DOE has derived the information and analysis results in Volume 1 from several site-specific appendixes. Volume 2 of the EIS, which supports the INEL-specific decision, describes environmental impacts for various environmental restoration, waste management, and spent nuclear fuel management alternatives for planning years 1995 through 2005. This Appendix B to Volume 1 considers the impacts on the INEL environment of the implementation of various DOE-wide spent nuclear fuel management alternatives. The Naval Nuclear Propulsion Program, which is a joint Navy/DOE program, is responsible for spent naval nuclear fuel examination at the INEL. For this appendix, naval fuel that has been examined at the Naval Reactors Facility and turned over to DOE for storage is termed naval-type fuel. This appendix evaluates the management of DOE spent nuclear fuel including naval-type fuel

  2. Development of the environmental data management system

    International Nuclear Information System (INIS)

    Tatebe, Kazuaki; Suzuki, Yurina; Shirato, Seiichi; Sato, Yoshinori

    2012-02-01

    The recent society requires business activities with environmental consideration to every enterprise. Also, Japanese laws require those activities. For example, 'Law Concerning the Promotion of Business Activities with Environmental Consideration by Specified Corporations, etc, by Facilitating Access to Environmental Information, and Other Measures' (Environmental Consideration Law) mandates publication of a report relating to the activities of environmental consideration to each enterprise above designated size. 'Act on the Rational Use of Energy' mandates the report of the results of energy consumption and the long-term plan of the rational use of energy. Moreover, 'Act on Promotion of Global Warming Countermeasures' mandates the report of the greenhouse gas emissions. In addition to those, 'Water Pollution Control Law', 'Waste Management and Public Cleaning Law' and other environmental laws as well as environmental ordinances require business activities with environmental consideration to all companies. So, it is very important for Japan Atomic Energy Agency (JAEA) to report business activities with environmental consideration in order to build up trustful relations with the nation and communities. The Environmental Data Management System has been developed as the data base of business activities with environmental consideration in JAEA and as the means to promote the activities at every site and office of JAEA. This report summarizes the structure of the Environmental Data Management System, kinds of environmental performance data treated by the system, and gathering methods of the data. (author)

  3. Environmental management system; El sistema de Gestion Medioambiental

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    An Environmental Management System was implemented in ANAV in 1999, including the two nuclear sites of the Asco and Vandellos II nuclear power plants. This implementation entailed formulation of the ANAV Environmental Policy, preparation of an Environmental Management Plan (PLAGMA) supported by the Environmental Aspects Manuals (MASMA) of each site and their operating procedures, modification of the organizational structure to create the Environment Unit, in charge of implementing the SIGEMA, and the Environment Committee, the governing body that reviews the results obtained and environmental goals to be achieved, and direct involvement of all the different ANAV organization in continuous improvement of the SIGEMA implementation. Special attention is paid to evolution of the environmental indicators, to communication and specific training in environmental issues, and to waste management and the different programs for increasing waste recycling and assessment, as well as to minimization programs. The article details the different approaches used to improve the environmental results in these last five years, which have allowed ANAV to maintain the ISO-14001 Certification since 1999. (Author)

  4. Environmental management: The bank's policy approach

    International Nuclear Information System (INIS)

    1992-01-01

    In order to play a leadership role in the environmental recovery of central and eastern Europe, the Bank will pursue the following policy priorities: assistance to the countries of operations in environmental policy formulation, including the development of effective legal and regulatory instruments, the adoption of appropriate emissions and effluents standards and the creation of the institutional and human resources capacity to monitor and enforce them; promoting the use of a variety of economic instruments to address the underlying cause of environmental degradation and the adoption of market-based techniques in environmental management programmes; encouraging the development of an environmental goods and services industry in the countries of operations, of commercially viable investments in environmental technologies and pollution prevention and control, and by funding environmental infrastructure projects; initiation of, or support for, special studies and programmes to address regional and national environmental problems and to promote environmental education within the population and institutions of the countries of operations; adoption of adequate environmental assessment, management planning, audit and monitoring procedures throughout its activities; and promoting the adoption and implementation of procedures for provision of information to, and consultation with, all levels of government and the general public - especially potentially affected parties - concerning environmental matters

  5. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum and maximum treatment, storage, and disposal of US Department of Energy wastes

  6. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1994-06-01

    This document analyzes at a pregrammatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For pregrammatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes

  7. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement

    International Nuclear Information System (INIS)

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes

  8. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

  9. Environmental protection and management guidebook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-11-15

    In British Columbia, oil and gas activities on private or Crown land are subject to regulations in terms of environmental practices. This environmental protection and management guidebook seeks to provide information on the Oil and Gas Activities Act. All sections from the regulation: water, riparian values, wildlife and wildlife habitat, conserving soil, forest health, invasive plants, natural range barriers, seismic lines, areas to be restored and old growth management areas, resource features and cultural heritage resources, are covered in this document. The minimum acceptable operational standards and practices for oil and gas activities in British Columbia are described. This guide is intended to provide clients and stakeholders with recommendations concerning the planning phase, before any permits are applied for, and concerning permissions or authorizations generally for oil and gas activities in British Columbia.

  10. 76 FR 56790 - Notice of Intent To Prepare an Amendment to the Caliente Resource Management Plan and Associated...

    Science.gov (United States)

    2011-09-14

    ... the EA will consider both a plan amendment and the subsequent sale of the land and has identified the... Plan and Associated Environmental Assessment AGENCY: Bureau of Land Management, Interior. ACTION... amendment to the 1997 Caliente Resource Management Plan (RMP) and an Environmental Assessment (EA) to...

  11. National Ignition Facility risk management plan, rev. 1

    International Nuclear Information System (INIS)

    Brereton, S J; Lane, M A

    1998-01-01

    The initial release of the National Ignition Facility (AUF) Risk Management Plan (LLNL, 1997a) was prepared in accordance with the DOE Life Cycle Asset Management Good Practice Guide (DOE, 1996a) and supported Critical Decision 3 (CD3), Approval to Initiate Construction (DOE, 1997a). The objectives of the plan were to: (1) Identify the risks to the completion of the Project in terms of meeting technical and regulatory requirements, cost, and schedule. (2) Assess the risks in terms of likelihood of occurrence and their impact potential relative to technical performance, ES and H (environmental, safety and health), costs, and schedule. (3) Address suitable risk mitigation measures for each identified risk. This revision of the Risk Management Plan considers project risks and vulnerabilities after CD3 (DOE, 1997a) was approved by the Secretary of Energy. During the one-year period since the initial release, the vulnerabilities of greatest concern have been the litigation of the Programmatic Environmental Impact Statement (PEIS) (DOE, 1996b) by a group of environmental organizations led by the Natural Resources Defense Council; the finding and successful clean-up of polychlorinated biphenyl (PCB)-filled electrical capacitors at the NIF site excavation; the FY98 congressional budget authorization and request for the FY99 budget authorization; funding for Inertial Confinement Fusion (ICF)/NIF programmatic activities (including French and other sources of funding); and finally, progress in the core science and technology, and optics program that form the basis for the NIF design

  12. Environmental Restoration Program Roadmap: Strategic program plan

    International Nuclear Information System (INIS)

    1992-01-01

    This document is a strategic plan for accomplishing environmental restoration objectives at the Department of Energy's (DOE) Portsmouth Gaseous Diffusion Plant (PORTS). Waste Management (WM) for environmental restoration activities and integration of these activities into the PORTS WM operations is addressed in this document. The document provides detailed information concerning specific assumptions and activities required to meet DOE's environmental restoration objectives at this site. Environmental contamination at PORTS consists mainly of spent solvents and low level radionuclides. Solvents were used for industrial metal cleaning operations required to maintain the process during operations. Plumes of groundwater contamination resulting from past disposal of these spent solvents in landfills and impoundments extend from several locations within the site. Also, two sludge impoundments associated with a chromate reduction facility were characterized as having soil and groundwater contaminated with hexavalent chromium

  13. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    2006-01-01

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs

  14. Highlights in Resource and Environmental Management of Canada and Enlightenment to China

    Institute of Scientific and Technical Information of China (English)

    Yan Nailing; Han Yan; Yu Ji; Xia Li

    2007-01-01

    The main environmental issues Canadian faced at present are of resource management,climate change,air pollution,water pollution and solid waste management.Canada federal government,especially the deputy department such as Natural Resource Canada and Environment Canada make actively responses to these pressures,given the mandate of these departments.Through the establishment of intergovernmental cooperative mechanism,enacting plan such as sustainable development strategy,environment Canada agenda,eco-action plan,Canadian characters brilliantly in dealing with resource and environmental issues.The implement framework and the knowledge gained from the progresses of the plans threw some light on China in dealing with the same issues.

  15. Community Solutions for Stormwater Management: A Guide for Voluntary Long-Term Planning

    Science.gov (United States)

    This draft guide describes how to develop a comprehensive long-term community stormwater plan that integrates stormwater management with communities’ broader plans for economic development, infrastructure investment and environmental compliance.

  16. Category mistakes: A barrier to effective environmental management.

    Science.gov (United States)

    Wallace, Ken J; Jago, Mark

    2017-09-01

    How entities, the things that exist, are defined and categorised affects all aspects of environmental management including technical descriptions, quantitative analyses, participatory processes, planning, and decisions. Consequently, ambiguous definitions and wrongly assigning entities to categories, referred to as category mistakes, are barriers to effective management. Confusion caused by treating the term 'biodiversity' variously as the property of an area, the biota of an area, and a preferred end state (a value) - quite different categories of entities - is one example. To overcome such difficulties, we develop and define four entity categories - elements, processes, properties, and values - and two derived categories - states and systems. We argue that adoption of these categories and definitions will significantly improve environmental communication and analysis, and thus strengthen planning and decision-making. Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. SEA of river basin management plans

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen; Kørnøv, Lone

    2009-01-01

    In, 2000 the European Parliament and the European Council passed the Water Framework Directive (WFD) to be implemented in all Member States. The consequence of the directive is that river basin management plans (RBMPs) shall be prepared which are legally subject to a strategic environmental...... assessment (SEA). An important environmental factor for the water sector is climate change, especially the changes it causes to the water environment. However, based on an argument of an inadequate knowledge base regarding climate change impacts, the prospect of Danish authorities including climate change...

  18. Environmental management plan of the mining and industrial uranium complex in Brazil

    International Nuclear Information System (INIS)

    Figuereido, N.; Hilton, M.; Wiikman, L.; Oliveira, M.; Taddei, J.

    1996-01-01

    The Mining and Industrial Complex of the Pocos de Caldas Plateau (CIPC) is located at Caldas, county in the southwest of Minas Gerais state. It is a plant of the Industrias Nucleares do Brazil S.A. -INB, the only installation in Brazil for the production of uranium concentrate (yellow-cake) as ammonium diuranate (Adu). The Environmental protection and control program in practice assures the environmental management plan, in operation, maintaining the Complex within technology standards required by updated environmental concepts. The mine is an open pit operation with a surface diameter of 1000 m and an actual average depth of 120 m. Some 44 x 10 6 m 3 of the overburden material were used in embankments structures to civil engineering works in the implantation of several installations in CIPC, and the other portion of the removed material was deposited in two pre-selected areas having both an upper area of about 2,0 x 10 6 m 2 . The annual average volume of waters transported to chemical treatment is about 9,0 x 10 5 m 3 . The mill, in its full operation, processes 2500 t of ore per day and the solid and liquid tailings are directed to a waste pond system where are contained approximately 2,0 x 10 6 m 3 (2,2 x 10 6 t) of solid wastes with an estimation of further 70 x 10 5 m 3 to be disposed. The upper surface of tailings pond is about 2,0 x 10 5 m 2 . Nowadays, the environmental protection and control program aims to the development of potential pollutant areas stabilization reintegrating them into their original features or adjusting them to other forms of laudable restoration. (authors). 1 fig

  19. Scientifically defensible fish conservation and recovery plans: Addressing diffuse threats and developing rigorous adaptive management plans

    Science.gov (United States)

    Maas-Hebner, Kathleen G.; Schreck, Carl B.; Hughes, Robert M.; Yeakley, Alan; Molina, Nancy

    2016-01-01

    We discuss the importance of addressing diffuse threats to long-term species and habitat viability in fish conservation and recovery planning. In the Pacific Northwest, USA, salmonid management plans have typically focused on degraded freshwater habitat, dams, fish passage, harvest rates, and hatchery releases. However, such plans inadequately address threats related to human population and economic growth, intra- and interspecific competition, and changes in climate, ocean, and estuarine conditions. Based on reviews conducted on eight conservation and/or recovery plans, we found that though threats resulting from such changes are difficult to model and/or predict, they are especially important for wide-ranging diadromous species. Adaptive management is also a critical but often inadequately constructed component of those plans. Adaptive management should be designed to respond to evolving knowledge about the fish and their supporting ecosystems; if done properly, it should help improve conservation efforts by decreasing uncertainty regarding known and diffuse threats. We conclude with a general call for environmental managers and planners to reinvigorate the adaptive management process in future management plans, including more explicitly identifying critical uncertainties, implementing monitoring programs to reduce those uncertainties, and explicitly stating what management actions will occur when pre-identified trigger points are reached.

  20. Environmental management systems - before, during and after construction

    International Nuclear Information System (INIS)

    Braun, T.L.

    1997-01-01

    The purpose of this paper is to describe an operational environmental managment system (EMS) as developed by TransCanada PipeLines, including an example of the application and concomitant benefits. The focus will be on the planning, construction, inspection and post-construction monitoring programs, covering approximately 3,190 kilometers of large diameter pipeline constructed between 1990 and 1996, across a wide range of Canadian land-uses and ecosystems. With the implementation of such systems, governments have recognized that corporate responsibility and self-management on environmental matters can result in effective, environmentally sound programs that minimize impacts and allow for a more cost-effective and streamlined regulatory approach. (au)

  1. Water resources management plan

    Directory of Open Access Journals (Sweden)

    Glauco Maia

    2011-12-01

    Full Text Available Water resources manageWith the mission of providing reliable data for water supply activities in medium and large firefighting operations, the Firefighting Water Supply Tactical Group (GTSAI represents an important sector of the Rio de Janeiro State Fire Departmentment plan strategic support. Acting proactively, the Tactical Group prepared a Water Resources Management Plan, aiming to set up water resources for each jurisdiction of firefighters in the City of Rio de Janeiro, in order to assist the Fire Department in its missions. This goal was reached, and in association with LAGEOP (Geoprocessing Laboratory, UFRJ, the Tactical Group started using GIS techniques. The plan provides for the register of existing operational structures within each group (troops, vehicles and special equipment, along with knowledge about the nature and operating conditions of fire hydrants, as well as a detailed survey of areas considered to be "critical". The survey helps to support actions related to environmental disasters involved in the aforementioned critical areas (hospital, churches, schools, and chemical industries, among others. The Caju neighborhood, in Rio de Janeiro, was defined as initial application area, and was the first jurisdiction to have the system implemented, followed by Copacabana, Leblon, Lagoa, and Catete districts.

  2. 40 CFR 256.02 - Scope of the State solid waste management plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Scope of the State solid waste management plan. 256.02 Section 256.02 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose, General Requirements, Definitions § 256.0...

  3. LLNL radioactive waste management plan as per DOE Order 5820.2

    International Nuclear Information System (INIS)

    1984-01-01

    The following aspects of LLNL's radioactive waste management plan are discussed: program administration; description of waste generating processes; radioactive waste collection, treatment, and disposal; sanitary waste management; site 300 operations; schedules and major milestones for waste management activities; and environmental monitoring programs (sampling and analysis)

  4. Idaho National Laboratory Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2008-04-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  5. FY 2001 Hanford Waste Management Strategic Plan

    International Nuclear Information System (INIS)

    COLLINS, M.S.

    2001-01-01

    We are pleased to present the 2001 Hanford Waste Management Program Strategic Plan. This plan supports the newly developed U. S. Department of Energy Site outcomes strategy. The 2001 Plan reflects current and projected needs for Waste Management Program services in support of Hanford Site cleanup, and updates the objectives and actions using new waste stream oriented logic for the strategic goals: (1) waste treatment/processing, storage, and disposal; (2) interfaces; and (3) program excellence. Overall direction for the Program is provided by the Waste Management Division, Office of the Assistant Manager for Environmental Restoration and Waste Management, U. S. Department of Energy, Richland Operations Office. Fluor Hanford, Inc. is the operating contractor for the program. This Plan documents proactive strategies for planning and budgeting, with a major focus on helping meet regulatory commitments in a timely and efficient manner and concurrently assisting us in completing programs cheaper, better and quicker. Newly developed waste stream oriented logic was incorporated to clarify Site outcomes. External drivers, technology inputs, treatment/processing, storage and disposal strategies, and stream specific strategies are included for the six major waste types addressed in this Plan (low-level waste, mixed low-level waste, contact-handled transuranic waste, remote-handled transuranic waste, liquid waste, and cesium/strontium capsules). The key elements of the strategy are identification and quantification of the needs for waste management services, assessment of capabilities, and development of cost-effective actions to meet the needs and to continuously improve performance. Accomplishment of specific actions as set forth in the Plan depends on continued availability of the required resources and funding. The primary objectives of Plan are: (1) enhance the Waste Management Program to improve flexibility, become more holistic especially by implementing new

  6. Natural Resource Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  7. Oak Ridge National Laboratory Waste Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented

  8. Public Participation Planning of Environmental Impact Assessment (EIA) and Regulations: Analysis of Inconsistency for Some Cases in Indonesia

    Science.gov (United States)

    Hindrayani, Aniek; Purwanto

    2018-02-01

    The failure in community involvement during the environmental documents planning may result in the failure of the planned project implementation. This study aims to determine the gap between practices and regulations that apply to the process of community involvement in the environmental documents planning, and find out inconsistency of implementation on each stakeholder in the planning of the Environmental Impact Assessment (EIA) and the environmental permit. The method used was qualitative through interview and literature study which is analyzed using triangulation model and presented in the form of concept map. The results of the study indicate that 1) the determination of community representatives based on the criteria of the impacted communities is not clearly described, 3) suggestions, opinions, and responses to the environmental impact management are not well implemented by the project proponent, 3) implementation of the environmental management of other licensed activities affecting the behavior (4) stakeholders (project proponent, EIA consultants, and EIA appraisal committee) do not play their role as mandated in applicable legislation.

  9. Project management plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-01-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place nineteen former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project win further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  10. 76 FR 63613 - Environmental Management Site-Specific Advisory Board, Hanford

    Science.gov (United States)

    2011-10-13

    ... Agency Community Relations Plan (Hanford Public Involvement Plan). [cir] 2011 Hanford Lifecycle Scope... Environmental Management Committee; Public Involvement and Communications Committee; and Budgets and Contracts... (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal...

  11. Environmental sensitive road planning and transportation techniques in forest engineering

    Directory of Open Access Journals (Sweden)

    H. Hulusi Acar

    2016-07-01

    Full Text Available Forestry management has activities dealing with technical, economic, social and environmental services. Forestry operations which are carried out on forest areas , an important part of the ecosistem are materialized in open space. This forestry activities on large areas and high sloping generally, include many different techniques. It is needed primarily to the forest road network in terms of forest management. Determining the approriate route in the natural environment, planning and road construction affairs for forest roads which are necessary accessing in forest areas, is also of great importance from an environmental viewpoint as well as technical and economic manner. Forest road planning which can not be changed later and left a permanent mark on the natural environment carries much more importance to the environment especially on sloping land. This is because, it is important choosing correct type of roaf structure, and doing periodic maintenance of the roads. Skidding activities, after wood production, is important in terms of its impact on forest soil and by means of effects on saplings and trees on the releated forest areas.The development of environmental sensitive techniques is difficult, limited or expensive for this wood extraction works which are made more difficult conditons in the sloping terrain. Therefore, especially in using some silvicultural methods wood extraction damages are even greater. In this study; some road planning, road construction and wood extraction techniques which performed by me have been made to examine the environmental aspects. Environment-friendly forest roads and primary transport techniques on the forest ecosystem are briefly explained and discussed in the frame of the environmental aspects.

  12. Adaptive social impact management for conservation and environmental management.

    Science.gov (United States)

    Kaplan-Hallam, Maery; Bennett, Nathan J

    2018-04-01

    Concerns about the social consequences of conservation have spurred increased attention the monitoring and evaluation of the social impacts of conservation projects. This has resulted in a growing body of research that demonstrates how conservation can produce both positive and negative social, economic, cultural, health, and governance consequences for local communities. Yet, the results of social monitoring efforts are seldom applied to adaptively manage conservation projects. Greater attention is needed to incorporating the results of social impact assessments in long-term conservation management to minimize negative social consequences and maximize social benefits. We bring together insights from social impact assessment, adaptive management, social learning, knowledge coproduction, cross-scale governance, and environmental planning to propose a definition and framework for adaptive social impact management (ASIM). We define ASIM as the cyclical process of monitoring and adaptively managing social impacts over the life-span of an initiative through the 4 stages of profiling, learning, planning, and implementing. We outline 14 steps associated with the 4 stages of the ASIM cycle and provide guidance and potential methods for social-indicator development, predictive assessments of social impacts, monitoring and evaluation, communication of results, and identification and prioritization of management responses. Successful ASIM will be aided by engaging with best practices - including local engagement and collaboration in the process, transparent communication of results to stakeholders, collective deliberation on and choice of interventions, documentation of shared learning at the site level, and the scaling up of insights to inform higher-level conservation policies-to increase accountability, trust, and perceived legitimacy among stakeholders. The ASIM process is broadly applicable to conservation, environmental management, and development initiatives at various

  13. Environmental dredging residual generation and management.

    Science.gov (United States)

    Patmont, Clay; LaRosa, Paul; Narayanan, Raghav; Forrest, Casey

    2018-05-01

    The presence and magnitude of sediment contamination remaining in a completed dredge area can often dictate the success of an environmental dredging project. The need to better understand and manage this remaining contamination, referred to as "postdredging residuals," has increasingly been recognized by practitioners and investigators. Based on recent dredging projects with robust characterization programs, it is now understood that the residual contamination layer in the postdredging sediment comprises a mixture of contaminated sediments that originate from throughout the dredge cut. This mixture of contaminated sediments initially exhibits fluid mud properties that can contribute to sediment transport and contamination risk outside of the dredge area. This article reviews robust dredging residual evaluations recently performed in the United States and Canada, including the Hudson River, Lower Fox River, Ashtabula River, and Esquimalt Harbour, along with other projects. These data better inform the understanding of residuals generation, leading to improved models of dredging residual formation to inform remedy evaluation, selection, design, and implementation. Data from these projects confirm that the magnitude of dredging residuals is largely determined by site conditions, primarily in situ sediment fluidity or liquidity as measured by dry bulk density. While the generation of dredging residuals cannot be avoided, residuals can be successfully and efficiently managed through careful development and implementation of site-specific management plans. Integr Environ Assess Manag 2018;14:335-343. © 2018 The Authors. Integrated Environmental Assessment and Management Published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2018 The Authors. Integrated Environmental Assessment and Management Published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).

  14. BNL ENVIRONMENTAL MONITORING PLAN TRIENNIAL UPDATE, JANUARY 2003.

    Energy Technology Data Exchange (ETDEWEB)

    BROOKHAVEN NATIONAL LABORATORY

    2003-01-01

    Brookhaven National Laboratory (BNL) is a multi-program national laboratory operated by Brookhaven Science Associates for the U.S. Department of Energy (DOE) and is located on a 5,265-acre site in Suffolk County, Long Island, New York. BNL has a comprehensive Environmental Management System (EMS) in place, which meets the requirements of the International Organization for Standardization 14001 EMS Standard, as described in the BNL EMS Manual. BNL's extensive environmental monitoring program is one component of the EMS, and the BNL Environmental Monitoring Plan (EMP) describes this program in detail. The data derived from systematically monitoring the various environmental media on site enable BNL to make informed decisions concerning the protection of human health and the environment and to be responsive to community concerns.

  15. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  16. 78 FR 76852 - Notice of Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and...

    Science.gov (United States)

    2013-12-19

    ... Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and Environmental Impact Statement, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent. SUMMARY: In... Management Plan (RMP) and Draft Environmental Impact Statement (EIS), and by this notice is announcing the...

  17. Final Environmental Assessment Addressing Implementation of the Integrated Natural Resources Management Plan for Kirtland Air Force Base

    Science.gov (United States)

    2014-09-01

    e.g., photovoltaic panels, solar collection, heat recovery systems, wind turbines , green roofs, and habitat-oriented storm water management) would...comprehensive range planning, cultural resources management planning, Bird /Wildlife Aircraft Strike Hazard planning, and pest management planning. In addition...manage wildlife resources. Assessment of wildlife populations at Kirtland AFB (e.g., bats, birds , predators, and herptiles) would provide a baseline that

  18. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as ''the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as ''the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs

  19. On Planning and Managing the Preservation of Historical Buildings

    Directory of Open Access Journals (Sweden)

    Č. Jarský

    2003-01-01

    Full Text Available The process of preserving and reconstructing historical buildings poses several specific questions and raises problems which must be solved in the planning and management stage of the building process - from questions of architectural and art-historical significance, via the future purpose of use of the building, links to the surrounding buildings, environmental questions, questions of cost, time analysis, and quality assurance problems. Many of these problems can be solved with the help of a computer model of the course of the rehabilitation and reconstruction of the building created by a construction technology network diagram. The CONTEC integrated project planning, management and quality control system based on these diagrams has been used for bidding, planning and managing the reconstruction process of several significant historical buildings in Prague and other cities.

  20. The Waste Management Plan integration into Decommissioning Plan of the WWR-S research reactor from Romania

    International Nuclear Information System (INIS)

    Barariu, Gheorghe; Oprescu, Theodor; Filip, Mihaela; Sociu, Florin

    2008-01-01

    The paper presents the progress of the Radioactive Waste Management Plan which accompanies the Decommissioning Plan for research reactor WWR-S located in Magurele, Ilfov, near Bucharest, Romania. The new variant of the Decommissioning Plan was elaborated taking into account the IAEA recommendation concerning radioactive waste management. A new feasibility study for WWR-S decommissioning was also developed. The preferred safe management strategy for radioactive wastes produced by reactor decommissioning is outlined. The strategy must account for reactor decommissioning, as well as rehabilitation of the existing Radioactive Waste Treatment Plant and the upgrade of the Radioactive Waste Disposal Facility at Baita-Bihor. Furthermore, the final rehabilitation of the laboratories and reusing of cleaned reactor building is envisaged. An inventory of each type of radioactive waste is presented. The proposed waste management strategy is selected in accordance with the IAEA assistance. Environmental concerns are part of the radioactive waste management strategy. (authors)

  1. The 2016-2018 National Plan of Management of Radioactive Materials and Wastes - Project

    International Nuclear Information System (INIS)

    Gazzo, Alexis; Robert, Jean-Gabriel; Abraham, Christophe; Benaze, Manon de

    2015-01-01

    A first document contains the project of the National Plan of Management of Radioactive Materials and Wastes (PNGMDR) for the period 2016-2018: principles and objectives (presentation of radioactive materials and wastes, principles to be taken into account to define pathways of management of radioactive wastes, legal and institutional framework, information transparency), the management of radioactive materials (context and challenges, management pathways, works on fast breeder reactors of fourth generation), assessment and perspectives of existing pathways of management of radioactive wastes (management of historical situations, management of residues of mining and sterile processing, management of waste with a high natural radioactivity, management of very short life waste, of very low activity wastes, and low and medium activity wastes), needs and perspectives regarding management processes to be implemented for the different types of radioactive wastes. Appendices to this document contain a recall of the content of previous PNGMDR since 2007, a synthesis of realisations and researches performed abroad, research orientations for the concerned period, and international agreement on spent fuel and radioactive waste management. A second document, released by the ASN, proposes an environmental and strategic assessment of the plan. A third one and a fourth one contain the opinion of the Environmental Authority, respectively on the plan preliminary focus, and on the plan itself. An answer to this last one is then proposed, followed by a synthesis of the plan project and the text of the corresponding decree

  2. Wildland Fire Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Green,T.

    2009-10-23

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the

  3. Proceedings of the 18. international symposium on mine planning and equipment selection (MPES 2009) and the 11. international symposium on environmental issues and waste management in energy and mineral production (SWEMP 2009) : mine planning and equipment selection and environmental issues and waste management in energy and mineral production

    International Nuclear Information System (INIS)

    Singhal, R.K.; Mehrotra, A.; Fytas, K.; Ge, H.

    2009-01-01

    This conference focused on the application of innovative technologies to the mineral industries and the development of productive methods for the mining and processing industries. It was attended by participants from North and South America, Europe, Australia, Africa and Asia with backgrounds in computer sciences, mining engineering and research in mineral production. The major topics addressed regarding mine planning and equipment selection included economic and technical feasibility studies; reserve estimation; mine development; design and planning of surface and underground mines; drilling, blasting, tunneling and excavation engineering; mining equipment selection; automation and information technology; maintenance and production management for mines and mining systems; mining in terms of health, safety and the environment; and rock mechanics and geotechnical applications. The topics addressed regarding waste management in energy and mineral production included the environmental impacts of coal-fired power projects; mining and reclamation; water management; social aspects of rehabilitation; sustainable development for mineral and energy industries; remediation of contaminated soil and groundwater; health hazard and safety issues in small-scale mining; environmental issues in surface and underground mining of metalliferous, coal, uranium and industrial minerals; occupational health and safety; control of effluents from mineral processing, metallurgy and chemical plants; emerging technologies for environmental protection; reliability of waste containment structures; and tailings treatment, recycling and disposal. The conference featured 162 presentations, of which 30 have been catalogued separately for inclusion in this database. refs., tabs., figs.

  4. Environmental Restoration Site-Specific Plan for the Portsmouth Gaseous Diffusion Plant, FY 93

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of this Site-Specific Plan (SSP) is to describe past, present, and future activities undertaken to implement Environmental Restoration and Waste Management goals at the Portsmouth Gaseous Diffusion Plant (PORTS). The SSP is presented in sections emphasizing Environmental Restoration description of activities, resources, and milestones

  5. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This document analyzes at a pregrammatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For pregrammatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  6. 7 CFR 650.5 - Environmental evaluation in planning.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Environmental evaluation in planning. 650.5 Section...-Assisted Programs § 650.5 Environmental evaluation in planning. (a) General. Environmental evaluation (EE) integrates environmental concerns throughout the planning, installation, and operation of NRCS-assisted...

  7. Identifying environmental safety and health requirements for an Environmental Restoration Management Contractor

    International Nuclear Information System (INIS)

    Beckman, W.H.; Cossel, S.C.; Alhadeff, N.; Lindamood, S.B.; Beers, J.A.

    1993-10-01

    The purpose of the Standards/Requirements Identification Program, developed partially in response to the Defense Nuclear Facilities Safety Board Recommendation 90-2, was to identify applicable requirements that established the Environmental Restoration Management Contractor's (ERMC) responsibilities and authorities under the Environmental Restoration Management Contract, determine the adequacy of these requirements, ascertain a baseline level of compliance with them, and implement a maintenance program that would keep the program current as requirements or compliance levels change. The resultant Standards/Requirements Identification Documents (S/RIDs) consolidate the applicable requirements. These documents govern the development of procedures and manuals to ensure compliance with the requirements. Twenty-four such documents, corresponding with each functional area identified at the site, are to be issued. These requirements are included in the contractor's management plan

  8. Feed Materials Production Center Waste Management Plan

    International Nuclear Information System (INIS)

    Watts, R.E.; Allen, T.; Castle, S.A.; Hopper, J.P.; Oelrich, R.L.

    1986-01-01

    In the process of producing uranium metal products used in Department of Energy (DOE) defense programs at other DOE facilities, various types of wastes are generated at the Feed Materials Production Center (FMPC). Process wastes, both generated and stored, are discussed in the Waste Management Plan and include low-level radioactive waste (LLW), mixed hazardous/radioactive waste, and sanitary/industrial waste. Scrap metal waste and wastes requiring special remediation are also addressed in the Plan. The Waste Management Plan identifies the comprehensive programs developed to address safe storage and disposition of all wastes from past, present, and future operations at the FMPC. Waste streams discussed in this Plan are representative of the waste generated and waste types that concern worker and public health and safety. Budgets and schedules for implementation of waste disposition are also addressed. The waste streams receiving the largest amount of funding include LLW approved for shipment by DOE/ORO to the Nevada Test Site (NTS) (MgF 2 , slag leach filter cake, and neutralized raffinate); remedial action wastes (waste pits, K-65 silo waste); thorium; scrap metal (contaminated and noncontaminated ferrous and copper scrap); construction rubble and soil generated from decontamination and decommissioning of outdated facilities; and low-level wastes that will be handled through the Low-Level Waste Processing and Shipping System (LLWPSS). Waste Management milestones are also provided. The Waste Management Plan is divided into eight major sections: Introduction; Site Waste and Waste Generating Process; Strategy; Projects and Operations; Waste Stream Budgets; Milestones; Quality Assurance for Waste Management; and Environmental Monitoring Program

  9. Fraser Valley System Reinforcement Project: Environmental planning and assessment report

    International Nuclear Information System (INIS)

    1991-06-01

    Transmission facilities in the south central Fraser Valley, British Columbia, need reinforcement in order to meet anticipated growth in power demand. This objective could be met by reinforcing substation facilities (adding 500-kV equipment and connection to transmission line 5L41) at the McLellan Substation in Surrey, at the Clayburn Substation in Matsqui, or at the Atchelitz Substation in Chilliwack. An assessment is provided of the environmental evaluation criteria applied to these potential sites for substation reinforcement and the rationale for selection of the Clayburn site as the environmentally most effective alternative. The Clayburn site is already cleared and managed for a 230-kV substation; environmental, land use, and socioeconomic impacts are considered manageable. The existing right-of-way for the 500-kV loop in to the substation can be utilized. In addition, the results of an environmental assessment and mitigation plan for the Clayburn substation reinforcement are described. The most significant factors that will require possible mitigative measures include fisheries, water quality, floodplain management, visual and recreational aspects, and heritage resources. 16 figs., 5 tabs

  10. Environmental Monitoring Plan, Sandia National Laboratories, Livermore

    International Nuclear Information System (INIS)

    Holland, R.C.

    1992-06-01

    This Environmental Monitoring Plan was written to fulfill the requirements of DOE Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories, Livermore. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 61 refs

  11. Effective integration of environmental leadership and environmental management systems within Cameco's Mining Division

    International Nuclear Information System (INIS)

    Nagy, K.; Borchardt, S.

    2010-01-01

    To support the implementation of its integrated Safety, Health, Environment & Quality (SHEQ) Policy, Cameco has undertaken an environmental leadership initiative with the goal of moving beyond regulatory compliance and significantly reducing environmental impacts in five key areas: air emissions, treated water quality and quantity, energy use and greenhouse gas emissions, and waste generation. To ensure environmental leadership becomes routine business practice, it was necessary to integrate the initiative into Cameco's programs and management systems at the corporate and operational levels. Operations-based environmental leadership strategies and action plans have since been developed, as well as a corporate reporting system to monitor Cameco's environmental performance. (author)

  12. 76 FR 55621 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2011-09-08

    ... California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental...-Solano Air Quality Management District portion of the California State Implementation Plan (SIP). This... the following local rule: Yolo-Solano Air Quality Management District Rule 2.41, Expandable...

  13. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs.

  14. Water management planning guideline for waterpower

    International Nuclear Information System (INIS)

    2002-05-01

    Hydroelectric power has been used in Ontario for over 150 years, providing the impetus to economic development in the province. Currently, 83 hydroelectric utilities own the more than 200 hydro power facilities in Ontario, accounting for approximately 26 per cent of the total electrical generating capacity in the province. Flood control and the creation of recreational opportunities were added benefits derived from the construction of hydroelectric dams. The three ways of operating hydroelectric facilities are: run-of-the-river which involves minimal forebay storage, peaking which involves the operation of the dam for specific periods of high energy demand, and intermediate. The Ontario government plans to open the electricity market to competition, guided by four principles: (1) protecting consumers and offering more choice, (2) ensuring a strong business climate with a reliable supply of electricity, (3) protecting the environment, and (4) encouraging new ways of doing business and new sources of power. To address issues that arise from the operation of hydroelectric facilities, dam owners and hydroelectric facilities operators are required to develop Water Management Plans, outlining how the facility will be operated to balance environmental, social and economic objectives. The present document was developed to define goals and principles concerning planning, the scope of Water Management Plans, the criteria and the general planning process to be adopted for the preparation of the Plans. 1 tab., 4 figs

  15. Evolution of Sustainability in American Forest Resource Management Planning in the Context of the American Forest Management Textbook

    Directory of Open Access Journals (Sweden)

    Thomas J. Straka

    2009-10-01

    Full Text Available American forest resource management and planning goes back to the European roots of American Forestry. Timber management plans, documents based on forest regulation for timber production, were the foundation of American forestry. These types of management plans predominated until World War II. Multiple use forestry developed after World War II and issues like recreation, wildlife, water quality, and wilderness became more important. In the 1970’s harvest scheduling became part of the planning process, allowing for optimization of multiple goals. By 2001 social, environmental, and economic goals were integrated into the timber production process. American forestry experienced distinct historical periods of resource planning, ranging from classic sustained yield timber production, to multiple use-sustained yield, to sustainable human-forest systems. This article traces the historical changes in forest management planning philosophy using the forest management textbooks of the time. These textbooks provide insight into the thought process of the forestry profession as changes in the concept of sustainability occurred.

  16. Assessment of environmental flow requirements for river basin planning in Zimbabwe

    Science.gov (United States)

    Mazvimavi, D.; Madamombe, E.; Makurira, H.

    There is a growing awareness and understanding of the need to allocate water along a river to maintain ecological processes that provide goods and services. Legislation in Zimbabwe requires water resources management plans to include the amount of water to be reserved for environmental purposes in each river basin. This paper aims to estimate the amount of water that should be reserved for environmental purposes in each of the 151 sub-basins or water management units of Zimbabwe. A desktop hydrological method is used to estimate the environmental flow requirement (EFR). The estimated EFRs decrease with increasing flow variability, and increase with the increasing contribution of base flows to total flows. The study has established that in order to maintain slightly modified to natural habitats along rivers, the EFR should be 30-60% of mean annual runoff (MAR) in regions with perennial rivers, while this is 20-30% in the dry parts of the country with rivers, which only flow during the wet season. The inclusion of EFRs in water resources management plans will not drastically change the proportion of the available water allocated to water permits, since the amount of water allocated to water permit holders is less than 50% of the MAR on 77% of the sub-basins in the country.

  17. 77 FR 31036 - Notice of Availability of the Record of Decision for the Taos Resource Management Plan...

    Science.gov (United States)

    2012-05-24

    ... Mexico. FOR FURTHER INFORMATION CONTACT: Brad Higdon, Planning and Environmental Coordinator, Taos Field..., largely through the public participation provided under NEPA. The Draft RMP/ Environmental Impact...] Notice of Availability of the Record of Decision for the Taos Resource Management Plan/Environmental...

  18. Teaching Professionals Environmental Management and Cleaner Technology Combining Educational Learning and Practice Learning

    DEFF Research Database (Denmark)

    Jørgensen, Ulrik; Jørgensen, Michael Søgaard; Rasmussen, Bent Hesse

    2001-01-01

    -ordinating efficient management of environmental problems and technological processes of change in companies, and within the area of planning and co-ordinating relevant public regulation. Two of the major cornerstones in the education of Environmental Management are 1) the education should provide the students......The objective of the education of Environmental Manager is to make the student able to understand and co-ordinate solutions of environmental problems within the industrial sector and the public authorities. As such the education aims at qualifying the student both within the area of planning and co...... with new scientific theories and methods that relate to their field of practice. And 2) the education should bring in and develop new competencies and perspectives that can act as renewable elements in the students’ practical work. Among other things this means that the education becomes a place where...

  19. Environmental management (Republic of Macedonia)

    International Nuclear Information System (INIS)

    1997-01-01

    A number of institutions are responsible for environmental monitoring, however, coordination between these agencies is poor. Also, not all parameters typically used to index pollution are measured due to lack of resources, unavailability of chemicals for analysis and obsolete equipment. The cause-effect relationship between health and pollution is not clearly known, except for a new urban areas. In order to create an efficient environmental management system, alterations of the present institutional structure are imperative. It is necessary to strengthen the Ministry of Urban Planning, Construction and Development as a short-term task to consider the need for establishing a separate Ministry of Environment in the long-term. The Ministry of Environment should be supported by an Environmental Institute, a modern inspection service and a department for staff training and international cooperation. The need to reinforce local units responsible for environmental enforcement is especially emphasized. (author)

  20. Mine planning and scheduling at Ranger Uranium Mine - environmental requirements and economics

    International Nuclear Information System (INIS)

    Bath, L.J.

    1984-01-01

    Ranger Uranium Mines operates an open cut located in the Northern Territory. Strict environmental controls govern all operations and the water management requirements have the greatest impact on mine planning. The two main goals of planning are to provide mill feed and to mine sufficient suitable quality waste rock for ongoing construction of the tailings dam. Early planning concentrated on staged development of the pit to provide access to as much ore as possible for a given amount of development. All waste was considered to be suitable construction material. Grade control of crusher feed was the main problem in planning, as wide variations occur in ore grade over relatively short distances. Water management for the site operates a 'no release' system for contaminated waters. Design storage has proven inadequate, and the open cut has been used as the extra storage. As construction of future stages of the tailings dam requires non-mineralised rock materials which meet specific quality criteria, the mine has had to re-examine long term planning and pit development strategies. This has entailed the collection of much data not required under normal mining conditions, such as the assaying of waste drill core. The overall impact on mine planning of the environmental regulations has been to alter the philosophy of earlier planning, making it necessary to create a new strategy for pit development with the accent on exposing waste

  1. Public Participation Planning of Environmental Impact Assessment (EIA and Regulations: Analysis of Inconsistency for Some Cases in Indonesia

    Directory of Open Access Journals (Sweden)

    Hindrayani Aniek

    2018-01-01

    Full Text Available The failure in community involvement during the environmental documents planning may result in the failure of the planned project implementation. This study aims to determine the gap between practices and regulations that apply to the process of community involvement in the environmental documents planning, and find out inconsistency of implementation on each stakeholder in the planning of the Environmental Impact Assessment (EIA and the environmental permit. The method used was qualitative through interview and literature study which is analyzed using triangulation model and presented in the form of concept map. The results of the study indicate that 1 the determination of community representatives based on the criteria of the impacted communities is not clearly described, 3 suggestions, opinions, and responses to the environmental impact management are not well implemented by the project proponent, 3 implementation of the environmental management of other licensed activities affecting the behavior (4 stakeholders (project proponent, EIA consultants, and EIA appraisal committee do not play their role as mandated in applicable legislation.

  2. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  3. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE's Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES ampersand H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report

  4. Analysis of DOE international environmental management activities

    Energy Technology Data Exchange (ETDEWEB)

    Ragaini, R.C.

    1995-09-01

    The Department of Energy`s (DOE) Strategic Plan (April 1994) states that DOE`s long-term vision includes world leadership in environmental restoration and waste management activities. The activities of the DOE Office of Environmental Management (EM) can play a key role in DOE`s goals of maintaining U.S. global competitiveness and ensuring the continuation of a world class science and technology community. DOE`s interest in attaining these goals stems partly from its participation in organizations like the Trade Policy Coordinating Committee (TPCC), with its National Environmental Export Promotion Strategy, which seeks to strengthen U.S. competitiveness and the building of public-private partnerships as part of U.S. industrial policy. The International Interactions Field Office task will build a communication network which will facilitate the efficient and effective communication between DOE Headquarters, Field Offices, and contractors. Under this network, Headquarters will provide the Field Offices with information on the Administration`s policies and activities (such as the DOE Strategic Plan), interagency activities, as well as relevant information from other field offices. Lawrence Livermore National Laboratory (LLNL) will, in turn, provide Headquarters with information on various international activities which, when appropriate, will be included in reports to groups like the TPCC and the EM Focus Areas. This task provides for the collection, review, and analysis of information on the more significant international environmental restoration and waste management initiatives and activities which have been used or are being considered at LLNL. Information gathering will focus on efforts and accomplishments in meeting the challenges of providing timely and cost effective cleanup of its environmentally damaged sites and facilities, especially through international technical exchanges and/or the implementation of foreign-development technologies.

  5. 77 FR 23747 - Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

    Science.gov (United States)

    2012-04-20

    ... Management Plan (RMP)/Final Environmental Impact Statement (EIS) for the John Day Basin planning area and by... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORP0000.16100000.DQ0000 LXSS053H0000 HAG10-0234] Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

  6. An inexact two-stage stochastic energy systems planning model for managing greenhouse gas emission at a municipal level

    International Nuclear Information System (INIS)

    Lin, Q.G.; Huang, G.H.

    2010-01-01

    Energy management systems are highly complicated with greenhouse-gas emission reduction issues and a variety of social, economic, political, environmental and technical factors. To address such complexities, municipal energy systems planning models are desired as they can take account of these factors and their interactions within municipal energy management systems. This research is to develop an interval-parameter two-stage stochastic municipal energy systems planning model (ITS-MEM) for supporting decisions of energy systems planning and GHG (greenhouse gases) emission management at a municipal level. ITS-MEM is then applied to a case study. The results indicated that the developed model was capable of supporting municipal energy systems planning and environmental management under uncertainty. Solutions of ITS-MEM would provide an effective linkage between the pre-regulated environmental policies (GHG-emission reduction targets) and the associated economic implications (GHG-emission credit trading).

  7. WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

    2003-09-01

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and

  8. Fund management plan

    International Nuclear Information System (INIS)

    1984-08-01

    This revision of the Fund Management Plan updates the original plan published in May 1983. It is derived from and supplements the Mission Plan of the Office of Civilian Radioactive Waste Management. A major purpose in preparing this Plan is to inform the public about management of the Nuclear Waste Fund and the Interim Storage Fund. The purpose of the Interim Storage Fund is to finance the provision of the Federal interim storage capacity of up to 1900 metric tons of spent nuclear fuel. The Nuclear Waste Fund is a separate account for all revenues and expenditures related to the geological disposal and monitored retrieval storage of civilian radioactive waste

  9. Environmental Education Strategic Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    This document is designed to guide the Environmental Education and Development Branch (EM-522) of the EM Office of Technology (OTD) Development, Technology Integration and Environmental Education Division (EM-52) in planning and executing its program through EM staff, Operations Offices, National Laboratories, contractors, and others.

  10. Westinghouse Hanford Company FY 1995 Materials Management Plan (MMP)

    International Nuclear Information System (INIS)

    Higginson, M.C.

    1994-10-01

    The safe and sound operation of facilities and storage of nuclear material are top priorities within Hanford's environmental management, site restoration mission. The projected materials estimates, based on the Materials Management Plan (MMP) assumptions outlined below, were prepared for Department of Energy (DOE) use in long-range planning. The Hanford MMP covers the period FY 1995 through FY 2005, as directed by DOE. All DOE Richland Operations (RL) Office facilities are essentially funded by the Office of Transition and Facilities Management, Environmental Restoration and Waste Management (EM). These facilities include PUREX, the UO 3 plant, N-Reactor, T-Plant, K-Basins, FFTF, PFP and the 300 Area Fuel Fabrication facilities. Currently DP provides partial funding for the latter two facilities. Beginning in FY 1996 (in accordance with DOE-HQ MMP assumptions), EM will fund expenses related to the storage, monitoring, and safeguarding of all Special Nuclear Material (SNM) in the PFP. Ownership and costs related to movement and/or stabilization of that material will belong to EM programs (excluding NE material). It is also assumed that IAEA will take over inventory validation and surveillance of EM owned SNM at this time (FY 1996)

  11. Environmental Management Department Quality Assurance Project Plan for Radionuclide Emission Measurements Project for compliance with National Emission Standards for Hazardous Air Pollutants (NESHAP)

    Energy Technology Data Exchange (ETDEWEB)

    Poole, D A

    1992-06-01

    This Quality Assurance Project Plan (QAPP) satisfies the quality assurance (QA) requirements in 40 CFR Part 61, Method 114, for ensuring that the radionuclide air emission measurements from the Y-12 Plant are representative; of a known precision and accuracy; and include administrative controls to ensure prompt response when emission measurements indicate an increase over normal radionuclide emissions. The QAPP ensures the quality of the Y-12 Plant radionuclide emission measurements data from the continuous samplers, breakthrough monitors, and minor radionuclide release points. The plan specifies the procedures for the management of the activities affecting the quality of the data for the Y-12 Plant Environmental Management Department (EMD) within the Health, Safety, Environment, and Accountability Division (HSEA).

  12. Environmental Management Department Quality Assurance Project Plan for Radionuclide Emission Measurements Project for compliance with National Emission Standards for Hazardous Air Pollutants (NESHAP)

    International Nuclear Information System (INIS)

    Poole, D.A.

    1992-06-01

    This Quality Assurance Project Plan (QAPP) satisfies the quality assurance (QA) requirements in 40 CFR Part 61, Method 114, for ensuring that the radionuclide air emission measurements from the Y-12 Plant are representative; of a known precision and accuracy; and include administrative controls to ensure prompt response when emission measurements indicate an increase over normal radionuclide emissions. The QAPP ensures the quality of the Y-12 Plant radionuclide emission measurements data from the continuous samplers, breakthrough monitors, and minor radionuclide release points. The plan specifies the procedures for the management of the activities affecting the quality of the data for the Y-12 Plant Environmental Management Department (EMD) within the Health, Safety, Environment, and Accountability Division (HSEA)

  13. DOE`s integrated low-level waste management program and strategic planning

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, G. [Dept. of Energy, Washington, DC (United States). Office of Environmental Restoration and Waste Management; Hwang, J. [Science Applications International Corp., Germantown, MD (United States)

    1993-03-01

    To meet the DOE`s commitment to operate its facilities in a safe, economic, and environmentally sound manner, and to comply with all applicable federal, state, and local rules, regulations, and agreements, DOE created the Office of Environmental Restoration and Waste Management (EM) in 1989 to focus efforts on controlling waste management and cleaning up contaminated sites. In the first few years of its existence, the Office of Waste Management (EM-30) has concentrated on operational and corrective activities at the sites. In 1992, the Office of Waste Management began to apply an integrated approach to managing its various waste types. Consequently, DOE established the Low-Level Waste Management Program (LLWMP) to properly manage its complex-wide LLW in a consistent manner. The objective of the LLWMP is to build and operate an integrated, safe, and cost-effective program to meet the needs of waste generators. The program will be based on acceptable risk and sound planning, resulting in public confidence and support. Strategic planning of the program is under way and is expected to take two to three years before implementation of the integrated waste management approach.

  14. 77 FR 64349 - Notice of Availability of the Draft West Eugene Wetlands Resource Management Plan/Environmental...

    Science.gov (United States)

    2012-10-19

    ... planning area that lead the BLM to focus management on threatened and endangered species, including the... golden paintbrush: The scarcity of the listed species and their habitat, the importance of the planning... planning area. Because the current management approach was not developed in an RMP, there are no land use...

  15. Application of an uncertainty analysis approach to strategic environmental assessment for urban planning.

    Science.gov (United States)

    Liu, Yi; Chen, Jining; He, Weiqi; Tong, Qingyuan; Li, Wangfeng

    2010-04-15

    Urban planning has been widely applied as a regulatory measure to guide a city's construction and management. It represents official expectations on future population and economic growth and land use over the urban area. No doubt, significant variations often occur between planning schemes and actual development; in particular in China, the world's largest developing country experiencing rapid urbanization and industrialization. This in turn leads to difficulty in estimating the environmental consequences of the urban plan. Aiming to quantitatively analyze the uncertain environmental impacts of the urban plan's implementation, this article developed an integrated methodology combining a scenario analysis approach and a stochastic simulation technique for strategic environmental assessment (SEA). Based on industrial development scenarios, Monte Carlo sampling is applied to generate all possibilities of the spatial distribution of newly emerged industries. All related environmental consequences can be further estimated given the industrial distributions as input to environmental quality models. By applying a HSY algorithm, environmentally unacceptable urban growth, regarding both economic development and land use spatial layout, can be systematically identified, providing valuable information to urban planners and decision makers. A case study in Dalian Municipality, Northeast China, is used to illustrate applicability of this methodology. The impacts of Urban Development Plan for Dalian Municipality (2003-2020) (UDP) on atmospheric environment are also discussed in this article.

  16. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part A

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  17. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2012-08-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  18. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2010-10-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  19. The 2016-2018 National Plan of Management of Radioactive Materials and Wastes. Final report

    International Nuclear Information System (INIS)

    2017-01-01

    A first document contains the final version of the French National Plan of Management of Radioactive Materials and Wastes (PNGMDR) for the period 2016-2018: principles and objectives (presentation of radioactive materials and wastes, principles to be taken into account to define pathways of management of radioactive wastes, legal and institutional framework, information transparency), the management of radioactive materials (context and challenges, management pathways, works on fast breeder reactors of fourth generation), assessment and perspectives of existing pathways of management of radioactive wastes (management of historical situations, management of residues of mining and sterile processing, management of waste with a high natural radioactivity, management of very short life waste, of very low activity wastes, and low and medium activity wastes), needs and perspectives regarding management processes to be implemented for the different types of radioactive wastes. Appendices to this document contain: a recall of the content of previous PNGMDR since 2007, a synthesis of realisations and researches performed abroad, research orientations for the concerned period, and international agreement on spent fuel and radioactive waste management. A second document, released by the ASN, proposes an environmental and strategic assessment of the plan. A third one and a fourth one contain the opinion of the Environmental Authority on the plan preliminary focus and the answer to the Environmental Authority by the ASN. Finally, a synthesis of the remarks made by the public about the PNGMDR and the answers to these remarks conclude the document

  20. US ITER Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  1. Daily time management and influence of environmental factors on use of electronic planning devices in adults with mental disability.

    Science.gov (United States)

    Janeslätt, Gunnel; Lindstedt, Helena; Adolfsson, Päivi

    2015-01-01

    To describe daily time management in adults with and without mental disability and to examine differences in the level of their daily time management; to describe the possessions and use of electronic planning devices (EPDs) in activities and how environmental factors influence the use of EPDs in adults with mental disability. In a descriptive and cross-sectional design, 32 participants using EPDs and a matched comparison group of 32 healthy adults was recruited. Time-Self rating scale measuring daily time management was adapted for adults. A study specific questionnaire was applied to collect data on five ICF environmental factors. Rasch modelling, descriptive and non-parametric statistics were applied. Time-S has acceptable psychometric properties for use on adults with mental disability. People with mental disability and low level of daily time management who use advanced EPDs are more influenced by environmental factors. The study group perceived that encouragement and support from professionals as well as services influence their use of EPDs. Time-S can safely be used for people with mental disability. EPDs do not fully compensate the needs of the target-group. Prescribers need to give considerations to this and therefore they should be provided with more knowledge about this matter. Implications for Rehabilitation The Time-S can be applied for measuring daily time management in adults. Adults with mental disability provided with EPDs are not fully compensated in daily time management. Professional support and encouragement as well as backing from the services are important factors for the use of EPDs. Because the smart phones are not prescribed as assistive technology, the need for help from professionals to facilitate daily life is stressed. Therefore, the professionals should be provided with more knowledge about the use of EPDs.

  2. 76 FR 59155 - Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft...

    Science.gov (United States)

    2011-09-23

    ... policies and emphasis on the management of public lands and local land use planning; and new data that have... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAD06000, L16100000.DP0000] Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft Environmental Impact Statement...

  3. Management strategies in hospitals: scenario planning

    Directory of Open Access Journals (Sweden)

    Ghanem, Mohamed

    2015-06-01

    Full Text Available Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  4. Management strategies in hospitals: scenario planning.

    Science.gov (United States)

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a "Stakeholder Feedback". Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and "blind spots". This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  5. Planning Support Systems (PSS-Based Spatial Plan Alternatives and Environmental Assessment

    Directory of Open Access Journals (Sweden)

    Hee-Sun Choi

    2016-03-01

    Full Text Available Spatial planning is at the core of national land and urban development. Many countries and cities seek sustainable development through various means such as coordinated environmental planning, environmental assessment, and internalization of environmental analysis and planning. A Planning Support System (PSS is a GIS (Geographic Information System-based, spatial decision-making support system that incorporates a variety of theories and pertinent models. This study adopted the “What if?” model to design an alternative spatial plan that includes generation of predictive scenarios and is relatively easy to use. In the cities studied, we identified a total of six scenarios based on the main drivers of development—namely, population and spatial policies. Subsequently, we assessed the alternatives for their environmental impact, preparing sensitivity maps for each major environmental issue in the target area (natural ecosystem, air and microclimate, natural disasters. One projected advantage of the “What if?” model is that its digital visualization of proposed plans may improve public awareness and involvement. Furthermore, the tool is expected to be highly useful in ensuring the objectivity of quantitative analyses. However, it is necessary to develop a PSS that is both standardized and tailored to the particular needs of each area. Finally, the development of an e-governance system will be beneficial in ensuring public access to the decision making process.

  6. Y-12 Site environmental protection program implementation plan (EPPIP)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

  7. Y-12 Site environmental protection program implementation plan (EPPIP)

    International Nuclear Information System (INIS)

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually

  8. The solvent management plan as a source of eco-efficiency indicators

    International Nuclear Information System (INIS)

    D'Amico, Flaviano; Valardi, Maria; Buleandra, Marian Mihai; Tanase, Ion

    2006-01-01

    Reducing emissions of VOCs (volatil organic compounds) is a top-priority environmental goal, because when they react in the atmosphere with NO X , CO and solar radiation, they form tropospheric ozone, a pollutant that has a large environmental impact and contributes to world climate change. The most innovative part of the solvent directive concerns the Solvent Management Plan (SMP): a very useful tool, especially for small and medium-sized enterprises. With relatively small changes, the SMP can be turned into a Solvent Management System (SMS) having the features of an Environmental Management System. By applying an SMP-SMS, a great number of indicators can be developed, analysed and used to improve eco-efficiency; furthermore, the SMP-SMS can help local authorities in charge of environmental control procedures, in decision-making processes [it

  9. Environmental management in small and medium-sized companies: an analysis from the perspective of the theory of planned behavior.

    Science.gov (United States)

    Sánchez-Medina, Agustín J; Romero-Quintero, Leonardo; Sosa-Cabrera, Silvia

    2014-01-01

    In the business context, concern for the environment began to develop when pressure from the public administration and environmental awareness groups raised the specific requirements for companies. The Theory of Planned Behavior considers that people's conduct is determined by the intention of carrying out a certain behavior. Thus, the individual's intent is determined by three factors related to the desired outcome of the behavior: the Personal Attitude toward the Results, the Perceived Social Norms, and the Perceived Behavioral Control over the action. Therefore, the objectives of this paper are to clarify the attitudes of the managers of Canarian small and medium-sized companies about taking environmental measures, and try to demonstrate whether there is a relationship between the proposed factors and the intention to take these measures.

  10. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  11. Implementation of the Environmental Management Concept in the Hospitality Industry

    Directory of Open Access Journals (Sweden)

    Manuela Dora Orboi

    2015-10-01

    Full Text Available Globally, the concern for the environment is continually growing, among travel and tourism industry operators. Each unit hotel has its identity, its characteristics, and therefore, it is necessary to use and apply specific information about the environment, so as to create their own proactive environment protection policies. It must be performed an overview of environmental issues affecting the company and the performance that it has. Each unit hotel policy must be based on actual consumer demand for tourist services - as an active and conscious part - along with unit staff. Environmental action planning of a hotel unit has to go through several stages. The preparation of environmental actions of a hotel unit, involves biological control, which should help in making decisions on the most important measures that would benefit. Implementing the concept of environmental management in the hospitality unit requires including and taking the following steps: motivation, actions planning, analyze their performance and progress. They form an annual cycle of environmental management, which will go each year, to identify both the difficulties that have arisen and achievements and recommendations for the future.

  12. Sound Waste Management Plan environmental operations, and used oil management system: Restoration project 97115. Exxon Valdez oil spill restoration project final report: Volumes 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oily wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals.

  13. Sound Waste Management Plan environmental operations, and used oil management system: Restoration project 97115. Exxon Valdez oil spill restoration project final report: Volumes 1 and 2

    International Nuclear Information System (INIS)

    1998-06-01

    This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oily wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals

  14. Integrating removal actions and remedial actions: Soil and debris management at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Goidell, L.C.; Hagen, T.D.; Strimbu, M.J.; Dupuis-Nouille, E.M.; Taylor, A.C.; Weese, T.E.; Yerace, P.J.

    1996-01-01

    Since 1991, excess soil and debris generated at the Fernald Environmental management Project (FEMP) have been managed in accordance with the principles contained in a programmatic Removal Action (RvA) Work Plan (WP). This plan provides a sitewide management concept and implementation strategy for improved storage and management of excess soil and debris over the period required to design and construct improved storage facilities. These management principles, however, are no longer consistent with the directions in approved and draft Records of Decision (RODs) and anticipated in draft RODs other decision documents. A new approach has been taken to foster improved management techniques for soil and debris that can be readily incorporated into remedial design/remedial action plans. Response, Compensation and Liability Act (CERCLA) process. This paper describes the methods that were applied to address the issues associated with keeping the components of the new work plan field implementable and flexible; this is especially important as remedial design is either in its initial stages or has not been started and final remediation options could not be precluded

  15. CPP-603 Underwater Fuel Storage Facility Site Integrated Stabilization Management Plan (SISMP), Volume I

    International Nuclear Information System (INIS)

    Denney, R.D.

    1995-10-01

    The CPP-603 Underwater Fuel Storage Facility (UFSF) Site Integrated Stabilization Management Plan (SISMP) has been constructed to describe the activities required for the relocation of spent nuclear fuel (SNF) from the CPP-603 facility. These activities are the only Idaho National Engineering Laboratory (INEL) actions identified in the Implementation Plan developed to meet the requirements of the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 to the Secretary of Energy regarding an improved schedule for remediation in the Defense Nuclear Facilities Complex. As described in the DNFSB Recommendation 94-1 Implementation Plan, issued February 28, 1995, an INEL Spent Nuclear Fuel Management Plan is currently under development to direct the placement of SNF currently in existing INEL facilities into interim storage, and to address the coordination of intrasite SNF movements with new receipts and intersite transfers that were identified in the DOE SNF Programmatic and INEL Environmental Restoration and Waste Management Environmental Impact Statement Record, of Decision. This SISMP will be a subset of the INEL Spent Nuclear Fuel Management Plan and the activities described are being coordinated with other INEL SNF management activities. The CPP-603 relocation activities have been assigned a high priority so that established milestones will be meet, but there will be some cases where other activities will take precedence in utilization of available resources. The Draft INEL Site Integrated Stabilization Management Plan (SISMP), INEL-94/0279, Draft Rev. 2, dated March 10, 1995, is being superseded by the INEL Spent Nuclear Fuel Management Plan and this CPP-603 specific SISMP

  16. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Science.gov (United States)

    2011-09-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0537; FRL-9457-6] California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of Direct Final Rule... Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143...

  17. Integrated Safety, Environmental and Emergency Management System (ISEEMS)

    International Nuclear Information System (INIS)

    Silver, R.; Langwell, G.; Thomas, C.; Coffing, S.

    1996-01-01

    The Risk Management and NEPA (National Environmental Policy Act) Department of Sandia National Laboratories/New Mexico (SNL/NM) recognized the need for hazard and environmental data analysis and management to support the line managers' need to know, understand, manage and document the hazards in their facilities and activities. The Integrated Safety, Environmental, and Emergency Management System (ISEEMS) was developed in response to this need. SNL needed a process that would quickly and easily determine if a facility or project activity contained only standard industrial hazards and therefore require minimal safety documentation, or if non-standard industrial hazards existed which would require more extensive analysis and documentation. Many facilities and project activities at SNL would benefit from the quick screening process used in ISEEMS. In addition, a process was needed that would expedite the NEPA process. ISEEMS takes advantage of the fact that there is some information needed for the NEPA process that is also needed for the safety documentation process. The ISEEMS process enables SNL line organizations to identify and manage hazards and environmental concerns at a level of effort commensurate with the hazards themselves by adopting a necessary and sufficient (graded) approach to compliance. All hazard-related information contained within ISEEMS is location based and can be displayed using on-line maps and building floor plans. This visual representation provides for quick assimilation and analysis

  18. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water

  19. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  20. Groundwater protection plan for the Environmental Restoration Disposal Facility

    International Nuclear Information System (INIS)

    Weekes, D.C.; Jaeger, G.K.; McMahon, W.J.; Ford, B.H.

    1996-01-01

    This document is the groundwater protection plan for the Environmental Restoration Disposal Facility (ERDF) Project. This plan is prepared based on the assumption that the ERDF will receive waste containing hazardous/dangerous constituents, radioactive constituents, and combinations of both. The purpose of this plan is to establish a groundwater monitoring program that (1) meets the intent of the applicable or relevant and appropriate requirements, (2) documents baseline groundwater conditions, (3) monitors those conditions for change, and (4) allows for modifications to groundwater sampling if required by the leachate management program. Groundwater samples indicate the occurrence of preexisting groundwater contamination in the uppermost unconfined aquifer below the ERDF Project site, as a result of past waste-water discharges in the 200 West Area. Therefore, it is necessary for the ERDF to establish baseline groundwater quality conditions and to monitor changes in the baseline over time. The groundwater monitoring program presented in this plan will provide the means to assess onsite and offsite impacts to the groundwater. In addition, a separate leachate management program will provide an indication of whether the liners are performing within design standards

  1. A proposed ecosystem-based management system for marine waters: linking the theory of environmental policy to the practice of environmental management

    Directory of Open Access Journals (Sweden)

    Rafael Sardà

    2014-12-01

    Full Text Available New coastal and marine management strategies have recently been developed in many countries and regions. From an ecosystem approach perspective, the aim of such strategies is the maintenance of ecosystem integrity while enabling the sustainable use of ecosystem goods and services. There is, however, a need for harmonized definitions and standardized processes to deal not only with the interjurisdictional and multidisciplinary complexities that are associated with such strategies but also with the extensive timelines and resources implicated in the planning and implementation of these strategies. The ecosystem-based management system proposed here is based on three pillars that facilitate the integration of an ecosystem approach to coastal and oceans policy development, regardless of the ecosystem or administrative scales. The managerial pillar is based on classical risk-management systems that incorporate environmental considerations and objectives within a continuous improvement cycle of adaptive management. The managerial pillar is supported by governance structures that provide oversight and thereby ensure that planning and implementation activities adhere to modern environmental principles. The information pillar ensures that data and scientific advice are based on current knowledge, and the participation pillar brings together communication and consultation requirements as indicated by the principles of the ecosystem approach.

  2. Plans for Managing Hanford Remote Handled Transuranic (TRU) Waste

    International Nuclear Information System (INIS)

    MCKENNEY, D.E.

    2001-01-01

    The current Hanford Site baseline and life-cycle waste forecast predicts that approximately 1,000 cubic meters of remote-handled transuranic (RH-TRU) waste will be generated by waste management and environmental restoration activities at Hanford. These 1,000 cubic meters, comprised of both transuranic and mixed transuranic (TRUM) waste, represent a significant portion of the total estimated inventory of RH-TRU to be disposed of at the Waste Isolation Pilot Plant (WIPP). A systems engineering approach is being followed to develop a disposition plan for each RH-TRU/TRUM waste stream at Hanford. A number of significant decision-making efforts are underway to develop and finalize these disposition plans, including: development and approval of a RH-TRU/TRUM Waste Project Management Plan, revision of the Hanford Waste Management Strategic Plan, the Hanford Site Options Study (''Vision 2012''), the Canyon Disposal Initiative Record-of-Decision, and the Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (SW-EIS). Disposition plans may include variations of several options, including (1) sending most RH-TRU/TRUM wastes to WIPP, (2) deferrals of waste disposal decisions in the interest of both efficiency and integration with other planned decision dates and (3) disposition of some materials in place consistent with Department of Energy Orders and the regulations in the interest of safety, risk minimization, and cost. Although finalization of disposition paths must await completion of the aforementioned decision documents, significant activities in support of RH-TRU/TRUM waste disposition are proceeding, including Hanford participation in development of the RH TRU WIPP waste acceptance criteria, preparation of T Plant for interim storage of spent nuclear fuel sludge, sharing of technology information and development activities in cooperation with the Mixed Waste Focus Area, RH-TRU technology demonstrations and deployments, and

  3. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  4. Life Cycle Environmental Management

    DEFF Research Database (Denmark)

    Pedersen, Claus Stig; Jørgensen, Jørgen; Pedersen, Morten Als

    1996-01-01

    A precondition for environmentally conscious management is the awareness of the environmental impact potentials created by an industrial company. There is an obvious need for management tools to support the implementation of relevant environmental criteria into the industrial decision making...... processes. The discipline of life cycle environmental management (LCEM) focuses on the incorporation of environmental criteria from the life cycles of products and other company activities into the company management processes. This paper introduces the concept of LCEM as an important element...... of the complete set of environmental objects in an industrial manufacturing company....

  5. The Hanford Site Environmental Restoration Program 1993 fiscal year work plan

    International Nuclear Information System (INIS)

    1992-09-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This document describes the overall ER Mission Area and provides FYWP appendixes for each of the five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Treatment, Storage, and/or Disposal (TSD)

  6. Optimization of environmental management strategies through a dynamic stochastic possibilistic multiobjective program

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Xiaodong, E-mail: xiaodong.zhang@beg.utexas.edu [Bureau of Economic Geology, Jackson School of Geosciences, The University of Texas at Austin, Austin, TX 78713 (United States); Huang, Gordon [Institute of Energy, Environment and Sustainable Communities, University of Regina, Regina, Saskatchewan S4S 0A2 (Canada)

    2013-02-15

    Highlights: ► A dynamic stochastic possibilistic multiobjective programming model is developed. ► Greenhouse gas emission control is considered. ► Three planning scenarios are analyzed and compared. ► Optimal decision schemes under three scenarios and different p{sub i} levels are obtained. ► Tradeoffs between economics and environment are reflected. -- Abstract: Greenhouse gas (GHG) emissions from municipal solid waste (MSW) management facilities have become a serious environmental issue. In MSW management, not only economic objectives but also environmental objectives should be considered simultaneously. In this study, a dynamic stochastic possibilistic multiobjective programming (DSPMP) model is developed for supporting MSW management and associated GHG emission control. The DSPMP model improves upon the existing waste management optimization methods through incorporation of fuzzy possibilistic programming and chance-constrained programming into a general mixed-integer multiobjective linear programming (MOP) framework where various uncertainties expressed as fuzzy possibility distributions and probability distributions can be effectively reflected. Two conflicting objectives are integrally considered, including minimization of total system cost and minimization of total GHG emissions from waste management facilities. Three planning scenarios are analyzed and compared, representing different preferences of the decision makers for economic development and environmental-impact (i.e. GHG-emission) issues in integrated MSW management. Optimal decision schemes under three scenarios and different p{sub i} levels (representing the probability that the constraints would be violated) are generated for planning waste flow allocation and facility capacity expansions as well as GHG emission control. The results indicate that economic and environmental tradeoffs can be effectively reflected through the proposed DSPMP model. The generated decision variables can help

  7. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions

    2002-09-24

    U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

  8. Exploration of Environmental Management

    OpenAIRE

    Li Shushu; Li Ruilong; Chen Rui

    2012-01-01

    On the basis of domestic and international research, this article takes research on peasant household and agricultural managements as base points, aims to build environmental management model, establish government-led, an effective environmental management mechanism between the government and peasant household. Analyzes the role of peasant household’ environmental management in the regional environmental improvement from the aspect of theoretical analysis and analyze significant factors affec...

  9. Analysis on the Chinese Urban Sustainable Development Demands for the Management Plan of Intelligent Transportation Systems

    Institute of Scientific and Technical Information of China (English)

    赵历男

    2002-01-01

    This article analyzes the demands of the sustainable development and Chinese urban environmental protection for the management plan of intelligent transportation systems. The article also comments on how to work out the management plan of intelligent transportation systems with China's own characteristics.

  10. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct... Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality Management District (SMAQMD...

  11. River Bank Erosion and the Influence of Environmental Flow Management

    Science.gov (United States)

    Vietz, Geoff J.; Lintern, Anna; Webb, J. Angus; Straccione, David

    2018-03-01

    Environmental flows aim to influence river hydrology to provide appropriate physical conditions for ecological functioning within the restrictions of flow regulation. The hydrologic characteristics of flow events, however, may also lead to unintended morphologic effects in rivers, such as increases in riverbank erosion beyond natural rates. This may negatively impact habitat for biota, riparian infrastructure, and land use. Strategic environmental flow delivery linked to monitoring and adaptive management can help mitigate risks. We monitor riverbank condition (erosion and deposition) relative to environmental flows on the Goulburn River, Victoria, Australia. We describe the process of adaptive management aimed at reducing potential impacts of flow management on bank condition. Field measurements (erosion pins) quantify the hydrogeomorphic response of banks to the delivery of planned and natural flow events. Managed flows provide opportunities for monitoring riverbank response to flows, which in turn informs planning. The results demonstrate that environmental flows have little influence on bank erosion and visual perceptions in the absence of monitoring are an unreliable guide. This monitoring project represents a mutually beneficial, science-practice partnership demonstrating that a traditional `know then do' approach can be foreshortened by close collaboration between researchers and managers. To do so requires transparent, often informal lines of communication. The benefits for researchers-a more strategic and targeted approach to monitoring activities; and benefits for the practitioners-reduced time between actions and understanding response; mean that a learn by doing approach is likely to have better outcomes for researchers, stakeholders, the public, and the environment.

  12. River Bank Erosion and the Influence of Environmental Flow Management.

    Science.gov (United States)

    Vietz, Geoff J; Lintern, Anna; Webb, J Angus; Straccione, David

    2018-03-01

    Environmental flows aim to influence river hydrology to provide appropriate physical conditions for ecological functioning within the restrictions of flow regulation. The hydrologic characteristics of flow events, however, may also lead to unintended morphologic effects in rivers, such as increases in riverbank erosion beyond natural rates. This may negatively impact habitat for biota, riparian infrastructure, and land use. Strategic environmental flow delivery linked to monitoring and adaptive management can help mitigate risks. We monitor riverbank condition (erosion and deposition) relative to environmental flows on the Goulburn River, Victoria, Australia. We describe the process of adaptive management aimed at reducing potential impacts of flow management on bank condition. Field measurements (erosion pins) quantify the hydrogeomorphic response of banks to the delivery of planned and natural flow events. Managed flows provide opportunities for monitoring riverbank response to flows, which in turn informs planning. The results demonstrate that environmental flows have little influence on bank erosion and visual perceptions in the absence of monitoring are an unreliable guide. This monitoring project represents a mutually beneficial, science-practice partnership demonstrating that a traditional 'know then do' approach can be foreshortened by close collaboration between researchers and managers. To do so requires transparent, often informal lines of communication. The benefits for researchers-a more strategic and targeted approach to monitoring activities; and benefits for the practitioners-reduced time between actions and understanding response; mean that a learn by doing approach is likely to have better outcomes for researchers, stakeholders, the public, and the environment.

  13. Integrating fire management analysis into land management planning

    Science.gov (United States)

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  14. 78 FR 68469 - Draft General Management Plan/Wilderness Study/Environmental Impact Statement, Channel Islands...

    Science.gov (United States)

    2013-11-14

    ... decision making, which will allow managers to effectively address future opportunities and problems, such... will serve as the basis for future detailed management documents, such as five-year strategic plans and...

  15. Hanford Site Environmental Restoration Program 1994 fiscal year work plan

    International Nuclear Information System (INIS)

    1993-01-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Disposal Facilities (DF)

  16. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    In FY 1990 Robotics Technology Development Program (RTDP) planning teams visited five DOE sites. These sites were selected by the Office of Technology Development to provide a needs basis for developing a 5-Year Plan. Visits to five DOE sites provided identification of needs for robotics technology development to support Environmental Restoration and Waste Management (ER ampersand WM) projects at those sites. Additional site visits will be conducted in the future to expand the planning basis. This volume summarizes both the results of the site visits and the needs and requirements of the priority ER ampersand WM activities at the sites, including potential needs for robotics and remote systems technology. It also discusses hazards associated with the site activities and any problems or technical uncertainties associated with dealing with the hazards in the performance of the ER ampersand WM work. Robotic or remote systems currently under development for remediation projects or waste operations are also discussed. The information in this document is organized principally by site, activity, and priority. Section 2.0, Site Needs, is based on information from the site visit reports and provides a summary which focuses on the site needs and requirements for each priority activity. Section 2.0 also records evaluations and discussions by the RTDP team following the site visit. Section 3.0, Commonality Assessment, documents similar site needs where common, or cross-cutting, robotics technology might be applied to several activities. Section 4.0 contains a summary of the site needs and requirements in tabular form. 1 tab

  17. Implementing the Environmental Management System ISO 14001 at the Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Jelev, Adrian

    2003-01-01

    An environmental management plan (EMP) has been developed for the Cernavoda NPP Unit 1. It contains the necessary components for identification and management of the environmental aspects of NPP. The environmental policy of the 'Nuclearelectrica' National Society and the associated EMP are the basis for the Environment Management System that will be implemented at Cernavoda NPP. The final step of this process will be the ISO 14001 certification. This paper points out to the main aspects concerning the implementation of the ISO 14001 system at Cernavoda NPP Unit 1. (author)

  18. Educational initiatives in environmental restoration and waste management

    International Nuclear Information System (INIS)

    Prestwich, S.M.

    1990-01-01

    Policy-makers responding to the urgency of the demands for a clean environment are finding that America lacks the technical know-how and the pool of technicians, scientists, and engineers to meet the environmental challenges. In response to the need for a technically skilled work force, government agencies and the private sector have worked to assess the probable effect of shortages and have sought ways to prevent the problem. The US Department of Energy (DOE) and its predecessor agencies have historically supported strong linkages between the academic community - the providers of scientists and engineers - and the department - the users of those workers - to assure an adequate supply of appropriately educated technicians, scientists, and engineers to conduct basic and applied research in support of the DOE's mission and to implement that mission. One of the department's challenges is the minimization, management, and cleanup of waste materials generated from departmental operations. The recently published Environmental Restoration and Waste Management Five-Year Plan for fiscal years 1992 through 1996 reaffirms DOE's policy of compliance with environmental laws and regulations. It also maps out the newly created Office of Environmental Restoration and Waste Management's aggressive programs to improve training and education, to arouse interest in pursuit of science/engineering careers, and to place special emphasis on recruiting minorities and women to technical fields vital to the environmental restoration/waste management mission

  19. Integrated watershed management: a planning methodology for construction of new dams in Ethiopia

    NARCIS (Netherlands)

    Bezuayehu, Tefera; Stroosnijder, L.

    2007-01-01

    Integrated watershed management (IWM) is emerging as an alternative to the centrally planned and sectoral approaches that currently characterize the planning process for dam construction in Ethiopia. This report clarifies the concept of IWM, and reviews the major social, environmental and economic

  20. An integrated approach to the Environmental Monitoring Plan of the Pertuso spring (Upper Valley of Aniene River

    Directory of Open Access Journals (Sweden)

    Giuseppe Sappa

    2014-06-01

    Full Text Available Quantitative assessment of groundwater and surface water is an important tool for sustainable management and protection of these important resources. This paper deals with the design of a multi-disciplinary monitoring plan related to the catchment project of the Pertuso spring, in the Upper Valley of Aniene River, which is going to be exploited to supply an important water network in the South part of Roma district. According to the Legislative Decree 152/2006, as modified by DM 260/2010, any infrastructure design should take in consideration an Environmental Monitoring Plan for the hydrogeological settings of the study area. Thus, the hydrogeological characterization combined with an Environmental Monitoring Plan provides to evaluate the potential adverse environmental impacts due catchment works. For water resources assessment and management, the quantification of groundwater recharge is a preliminary step. As a matter of fact, it has been included the quantitative characterization of the Pertuso spring, in the aim of to protect catchment area, which is directly affect by the natural hydrogeological balance of this aquifer. Thus, a multi-disciplinary monitoring plan has been set up, including quantitative and hydrogeochemical measurements, both for groundwater and surface water of the Upper Valley of Aniene River. The target of this Environmental Monitoring Plan is to set up the background framework on the hydromorphological, physico-chemical and biological properties of water resources in the water basin influenced aim by any potential environmental impact due to the construction activities. The Environmental Monitoring Plan and main features of the monitoring network will be presented in this study.

  1. The integration between strategic planning and environmental management in the oil and gas segment. PETROBRAS S/A case study; A integracao entre o planejamento estrategico e gestao ambiental no segmento de petroleo e gas. O caso da PETROBRAS S/A

    Energy Technology Data Exchange (ETDEWEB)

    Lins, Luiz dos Santos

    2007-10-15

    One of the ways of measuring the importance of environmental management in productive activities that have a high risk of accidents is to evaluate the integration level between environmental management adopted by the company and its strategic planning. The analysis of this interaction becomes even more relevant when the range considered is ten years, from 1995 to 2004, and besides that, when during this period there are serious environmental accidents that have a strong repercussion in the media. The biggest Brazilian company, PETROBRAS - Petroleo Brasileiro S/A had in 2000 two serious environmental accidents with a total oil spill of approximately 5.3 million liters. These accidents caused severe changes in the company's environmental management having direct influence in its strategic planning. This thesis aims at: discussing the integration between PETROBRAS - Petroleo Brasileiro S/A environment management and its strategic plans from 1995 to 2004; evidencing the changes that occurred after the environmental accidents, as well as, verifying the possible effects upon the economical and financial results and the company's behavior during the period. (author)

  2. The integration between strategic planning and environmental management in the oil and gas segment. PETROBRAS S/A case study; A integracao entre o planejamento estrategico e gestao ambiental no segmento de petroleo e gas. O caso da PETROBRAS S/A

    Energy Technology Data Exchange (ETDEWEB)

    Lins, Luiz dos Santos

    2007-10-15

    One of the ways of measuring the importance of environmental management in productive activities that have a high risk of accidents is to evaluate the integration level between environmental management adopted by the company and its strategic planning. The analysis of this interaction becomes even more relevant when the range considered is ten years, from 1995 to 2004, and besides that, when during this period there are serious environmental accidents that have a strong repercussion in the media. The biggest Brazilian company, PETROBRAS - Petroleo Brasileiro S/A had in 2000 two serious environmental accidents with a total oil spill of approximately 5.3 million liters. These accidents caused severe changes in the company's environmental management having direct influence in its strategic planning. This thesis aims at: discussing the integration between PETROBRAS - Petroleo Brasileiro S/A environment management and its strategic plans from 1995 to 2004; evidencing the changes that occurred after the environmental accidents, as well as, verifying the possible effects upon the economical and financial results and the company's behavior during the period. (author)

  3. Effective integration of environmental leadership and environmental management systems within Cameco's Mining Division

    Energy Technology Data Exchange (ETDEWEB)

    Nagy, K.; Borchardt, S., E-mail: kevin_nagy@cameco.com [Cameco Corp., Saskatoon, SK (Canada)

    2010-07-01

    To support the implementation of its integrated Safety, Health, Environment & Quality (SHEQ) Policy, Cameco has undertaken an environmental leadership initiative with the goal of moving beyond regulatory compliance and significantly reducing environmental impacts in five key areas: air emissions, treated water quality and quantity, energy use and greenhouse gas emissions, and waste generation. To ensure environmental leadership becomes routine business practice, it was necessary to integrate the initiative into Cameco's programs and management systems at the corporate and operational levels. Operations-based environmental leadership strategies and action plans have since been developed, as well as a corporate reporting system to monitor Cameco's environmental performance. (author)

  4. Planning for quality stewardship: The sitewide environmental impact statement

    International Nuclear Information System (INIS)

    Webb, D.

    1995-01-01

    The U.S Department of Energy is responsible for managing many large tracts of Federal land throughout this country. These sites host the nation's nuclear weapons complex, national laboratories, environmental restoration facilities, and serve other uses. The Department faces unique problems in administering this land. Many have multiple activities taking place at the same time; for example, a site may simultaneously be used for energy research, technology development, waste disposal and wildlife habitat. The sites often use radioactive and other hazardous materials and many are contaminated as a result of past management practices. In 1992 the Department institutes a policy, as stated in its National Environmental Policy Act regulations [10 CFR 1021], to prepare sitewide environmental impact statements for its large, multipurpose sites. For the first time, through the sitewide environmental impact statement process, the Department has an effective tool to plan for quality stewardship of the lands and resources entrusted to its care. The sitewide environmental impact statement is a specialized type of programmatic environmental impact statement which allows the Department to look at the geographically connected actions taking place at a given site. The sitewide statement allows a comprehensive look at the operational baseline for the entire site to determine the total cumulative impact of ongoing operations at the site. The Department can identify areas where a change in management practices would mitigate undesirable impacts; areas not at issue could continue under existing practices. As a result, an environmentally-sound operating envelope can be established. This, in turn, can serve in the future as a threshold to decide if new proposals would result in significant impacts to the site as a whole, to simplify future National Environmental Policy Act reviews

  5. 77 FR 23193 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2012-04-18

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0180; FRL-9652-3] Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District portion of the California State Implementation Plan...

  6. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0276; FRL-9139-8] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  7. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9670-9] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  8. 75 FR 6257 - Watts Bar Reservoir Land Management Plan, Loudon, Meigs, Rhea, and Roane Counties, TN

    Science.gov (United States)

    2010-02-08

    ... TENNESSEE VALLEY AUTHORITY Watts Bar Reservoir Land Management Plan, Loudon, Meigs, Rhea, and... Watts Bar Reservoir in Tennessee. On November 19, 2009, the TVA Board of Directors (TVA Board) decided... the final environmental impact statement (FEIS) for the Watts Bar Reservoir Land Management Plan...

  9. Optimization of environmental management strategies through a dynamic stochastic possibilistic multiobjective program.

    Science.gov (United States)

    Zhang, Xiaodong; Huang, Gordon

    2013-02-15

    Greenhouse gas (GHG) emissions from municipal solid waste (MSW) management facilities have become a serious environmental issue. In MSW management, not only economic objectives but also environmental objectives should be considered simultaneously. In this study, a dynamic stochastic possibilistic multiobjective programming (DSPMP) model is developed for supporting MSW management and associated GHG emission control. The DSPMP model improves upon the existing waste management optimization methods through incorporation of fuzzy possibilistic programming and chance-constrained programming into a general mixed-integer multiobjective linear programming (MOP) framework where various uncertainties expressed as fuzzy possibility distributions and probability distributions can be effectively reflected. Two conflicting objectives are integrally considered, including minimization of total system cost and minimization of total GHG emissions from waste management facilities. Three planning scenarios are analyzed and compared, representing different preferences of the decision makers for economic development and environmental-impact (i.e. GHG-emission) issues in integrated MSW management. Optimal decision schemes under three scenarios and different p(i) levels (representing the probability that the constraints would be violated) are generated for planning waste flow allocation and facility capacity expansions as well as GHG emission control. The results indicate that economic and environmental tradeoffs can be effectively reflected through the proposed DSPMP model. The generated decision variables can help the decision makers justify and/or adjust their waste management strategies based on their implicit knowledge and preferences. Copyright © 2012 Elsevier B.V. All rights reserved.

  10. Natural resource management activities at the Savannah River Site. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    This environmental assessment (EA) reviews the environmental consequences of ongoing natural resource management activities on the Savannah River Site (SRS). Appendix A contains the Natural Resources Management Plant (NRMP). While several SRS organizations have primary responsibilities for different elements of the plan, the United States Department of Agriculture (USDA), Forest Service, Savannah River Forest Station (SRFS) is responsible for most elements. Of the river scenarios defined in 1985, the High-Intensity Management alternative established the upper bound of environmental consequences; it represents a more intense level of resource management than that being performed under current resource management activities. This alternative established compliance mechanisms for several natural resource-related requirements and maximum practical timber harvesting. Similarly, the Low-Intensity Management alternative established the lower bound of environmental consequences and represents a less intense level of resource management than that being performed under current resource management activities. This alternative also established compliance mechanisms, but defined a passively managed natural area. The Proposed Action of this EA describes the current level of multiple-natural resource management. This EA reviews the proposed action, and the high and low intensity alternative scenarios.

  11. 77 FR 12495 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion of...

  12. Environmental Management in Small and Medium-Sized Companies: An Analysis from the Perspective of the Theory of Planned Behavior

    Science.gov (United States)

    Sánchez-Medina, Agustín J.; Romero-Quintero, Leonardo; Sosa-Cabrera, Silvia

    2014-01-01

    In the business context, concern for the environment began to develop when pressure from the public administration and environmental awareness groups raised the specific requirements for companies. The Theory of Planned Behavior considers that people's conduct is determined by the intention of carrying out a certain behavior. Thus, the individual's intent is determined by three factors related to the desired outcome of the behavior: the Personal Attitude toward the Results, the Perceived Social Norms, and the Perceived Behavioral Control over the action. Therefore, the objectives of this paper are to clarify the attitudes of the managers of Canarian small and medium-sized companies about taking environmental measures, and try to demonstrate whether there is a relationship between the proposed factors and the intention to take these measures. PMID:24533094

  13. Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, M.J.

    2005-12-20

    This report summarizes the results of environmental surveys conducted within the corridor of a temporary haul road (''Haul Road'') to be constructed from East Tennessee Technology Park (ETTP) to the Environmental Management Waste Management Facility (EMWMF) located just west of the Y-12 National Security Complex (Y-12). Environmental surveys were conducted by natural resource experts at Oak Ridge National Laboratory who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). ORNL assistance to the Haul Road Project included environmental assessments necessary to determine the best route for minimizing impacts to sensitive resources such as wetlands or rare plants. Once the final route was chosen, environmental surveys were conducted within the corridor to evaluate the impacts to sensitive resources that could not be avoided. The final Haul Road route follows established roads and a power-line corridor to the extent possible (Fig. 1). Detailed explanation regarding the purpose of the Haul Road and the regulatory context associated with its construction is provided in at least two major documents and consequently is not presented here: (1) Explanation of Significant Differences for the Record of Decision for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (January 2005, DOE/OR/01-2194&D2), and (2) Environmental Monitoring Plan for The ETTP to EMWMF Haul Road for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (April 2005, BJC/OR-2152). The focus of this report is a description of the sensitive resources to be impacted by Haul Road construction. Following a short description of the methods used for the environmental surveys, results and observations are presented in the following subsections: (1) General description

  14. LCA for household waste management when planning a new urban settlement

    International Nuclear Information System (INIS)

    Slagstad, Helene; Brattebø, Helge

    2012-01-01

    Highlights: ► Household waste management of a new carbon neutral settlement. ► EASEWASTE as a LCA tool to compare different centralised and decentralised solutions. ► Environmental benefit or close to zero impact in most of the categories. ► Paper and metal recycling important for the outcome. ► Discusses the challenges of waste prevention planning. - Abstract: When planning for a new urban settlement, industrial ecology tools like scenario building and life cycle assessment can be used to assess the environmental quality of different infrastructure solutions. In Trondheim, a new greenfield settlement with carbon–neutral ambitions is being planned and five different scenarios for the waste management system of the new settlement have been compared. The results show small differences among the scenarios, however, some benefits from increased source separation of paper and metal could be found. The settlement should connect to the existing waste management system of the city, and not resort to decentralised waste treatment or recovery methods. However, as this is an urban development project with ambitious goals for lifestyle changes, effort should be put into research and initiatives for proactive waste prevention and reuse issues.

  15. Environmental Management

    DEFF Research Database (Denmark)

    Lehmann, Martin

    The doctoral research project is co-financed by DUCED-I&UA and is part of a joint effort of Thai, Malay, South African and Danish universities to conduct collaborative research on the overarching theme "Environmental Management: Globalisation and Industrial Governance in Developing Countries......". The PhD project is expected to conclude ultimo 2005. Environmental management and cleaner production (CP) are both internationally recognised as tools for minimising environmental impacts of production or services. However, several studies have shown that especially SMEs, which probably amount to more...

  16. Environmental Regulatory Compliance Plan for Site Characterization

    International Nuclear Information System (INIS)

    1988-12-01

    The DOE is committed to conduct its operations in an environmentally safe and sound manner, and will comply with applicable environmental statutes and regulations. These objectives are described in DOE Order 5400.1 (Environmental Protection Program Requirements). This document -- the Environmental Regulatory Compliance Plan (ERCP) -- is one method of implementing the policy set forth in DOE Order 5400.1 and the NWPA. The ERCP describes the plan by which the DOE will comply with applicable Federal environmental statutes and regulations. The ERCP also discusses how DOE will address State and local environmental statutes and regulations. 180 refs., 27 figs., 1 tab

  17. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  18. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  19. Resource management as a key factor for sustainable urban planning

    NARCIS (Netherlands)

    Agudelo Vera, C.M.; Mels, A.R.; Keesman, K.J.; Rijnaarts, H.H.M.

    2011-01-01

    Due to fast urbanization and increasing living standards, the environmental sustainability of our global society becomes more and more questionable. In this historical review we investigate the role of resources management (RM) and urban planning (UP) and propose ways for integration in sustainable

  20. Quality Assurance Program Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1992-01-01

    The United States Department of Energy (USDOE) has initiated the Environmental Restoration Program (ERP) in an effort to manage, control and remediate existing hazardous, toxic and radioactive wastes generated at the Portsmouth Gaseous Diffusion Plant (PORTS). This ERP Quality Assurance Program Plan (QAPP) is responsive to the PORTS ESH Division QAPP and the ES Environmental Restoration Division (ERD) QAPP. This QAPP establishes the policies, requirements and responsibilities by which an appropriate level of QA shall be implemented within the PORTS-ERP. All PORTS-ERP activities shall be conducted in accordance with the requirements of this document and/or of a project level document which is derivative of this document

  1. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement. Volume 1, Appendix B: Idaho National Engineering Laboratory Spent Nuclear Fuel Management Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The US Department of Energy (DOE) has prepared this report to assist its management in making two decisions. The first decision, which is programmatic, is to determine the management program for DOE spent nuclear fuel. The second decision is on the future direction of environmental restoration, waste management, and spent nuclear fuel management activities at the Idaho National Engineering Laboratory. Volume 1 of the EIS, which supports the programmatic decision, considers the effects of spent nuclear fuel management on the quality of the human and natural environment for planning years 1995 through 2035. DOE has derived the information and analysis results in Volume 1 from several site-specific appendixes. Volume 2 of the EIS, which supports the INEL-specific decision, describes environmental impacts for various environmental restoration, waste management, and spent nuclear fuel management alternatives for planning years 1995 through 2005. This Appendix B to Volume 1 considers the impacts on the INEL environment of the implementation of various DOE-wide spent nuclear fuel management alternatives. The Naval Nuclear Propulsion Program, which is a joint Navy/DOE program, is responsible for spent naval nuclear fuel examination at the INEL. For this appendix, naval fuel that has been examined at the Naval Reactors Facility and turned over to DOE for storage is termed naval-type fuel. This appendix evaluates the management of DOE spent nuclear fuel including naval-type fuel.

  2. Radioactive and mixed waste management plan for the Lawrence Berkeley Laboratory Hazardous Waste Handling Facility

    International Nuclear Information System (INIS)

    1995-01-01

    This Radioactive and Mixed Waste Management Plan for the Hazardous Waste Handling Facility at Lawrence Berkeley Laboratory is written to meet the requirements for an annual report of radioactive and mixed waste management activities outlined in DOE Order 5820.2A. Radioactive and mixed waste management activities during FY 1994 listed here include principal regulatory and environmental issues and the degree to which planned activities were accomplished

  3. Strategic plan and strategy of the Oak Ridge National Laboratory Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-06-01

    This report provides information about the use of an integrated strategic plan, strategy, and life-cycle baseline in the long range planning and risk process employed by the environmental restoration program at the Oak Ridge National Laboratory (ORNL). Long-range planning is essential because the ER Program encompasses hundreds of sites; will last several decades; and requires complex technology, management, and policy. Long-range planning allows a focused, cost-effective approach to identify and meet Program objectives. This is accomplished through a strategic plan, a strategy, and a life-cycle baseline. This long-range methodology is illustrated below

  4. Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    2004-01-01

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not

  5. Wilderness fire management planning guide

    Science.gov (United States)

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  6. Environmental management

    International Nuclear Information System (INIS)

    Girard, M.; Mondino, M.

    2000-01-01

    Nowadays, unlike in the past, companies have to operate in a context of sustainable development, in which the economic and social development, production and consumption have to take into account the medium and long term impact on environment. The article sets forth some considerations about these subjects, which are assuming a growing importance in the management of companies: the variable environment may for instance be a factor of discrimination between being competitive or not. In order to characterise the context within which the environmental management has to be applied, some basic concepts about environmental management systems, Life Cycle Assessment, and Eco labeling are illustrated. As an example of application of the methodology described, a brief reference to the Italgas Group Environmental Report is given [it

  7. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy`s Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  8. Sample management implementation plan: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Sample Management Implementation Plan is to define management controls and building requirements for handling materials collected during the site characterization of the Deaf Smith County, Texas, site. This work will be conducted for the US Department of Energy Salt Repository Project Office (SRPO). The plan provides for controls mandated by the US Nuclear Regulatory Commission and the US Environmental Protection Agency. Salt Repository Project (SRP) Sample Management will interface with program participants who request, collect, and test samples. SRP Sample Management will be responsible for the following: (1) preparing samples; (2) ensuring documentation control; (3) providing for uniform forms, labels, data formats, and transportation and storage requirements; and (4) identifying sample specifications to ensure sample quality. The SRP Sample Management Facility will be operated under a set of procedures that will impact numerous program participants. Requesters of samples will be responsible for definition of requirements in advance of collection. Sample requests for field activities will be approved by the SRPO, aided by an advisory group, the SRP Sample Allocation Committee. This document details the staffing, building, storage, and transportation requirements for establishing an SRP Sample Management Facility. Materials to be managed in the facility include rock core and rock discontinuities, soils, fluids, biota, air particulates, cultural artifacts, and crop and food stuffs. 39 refs., 3 figs., 11 tabs

  9. Oak Ridge National Laboratory Waste Management Plan. Rev. 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  10. Krsko Nuclear Power Plant's Environmental Management System in Compliance with ISO 14001:2004

    International Nuclear Information System (INIS)

    Kusar, A.; Kavsek, D.

    2010-01-01

    Krsko Nuclear Power Plant (NPP) pays special attention to environmental protection and practices environmental safety in all plant processes and management. In 2008, Krsko NPP introduced the Environmental Management System in compliance with ISO 14001:2004 standard. The plant management announced the Environmental policy which is a part of the business strategy of Krsko NPP which is an eco-friendly company. The Policy is a commitment of the plant management and all staff to act in compliance with requirements of ISO 14001:2004. The standard served as a basis for developing some new documentation such as Environmental Management System Quality Manual, Environmental planning procedures identifying legal and other requirements, Register of environmental aspects, Register of legal and other requirements etc. When establishing the Register of environmental aspects, all possible environmental impacts of the plant were carefully reviewed and estimated. Following the introduction and certification audit in October and December 2008 of Bureau Veritas Certification, Krsko NPP was awarded certificate ISO 14001:2004 attesting conformity of its Environmental Management System with this standard. The Environmental Certificate means that Krsko NPP will promote a positive environmental culture and maintain a safe, healthy and environmentally-sound workplace for all its employees, contractors and visitors.(author).

  11. Sandia National Laboratories, California Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    2009-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia

  12. Social and environmental issues in developing vegetation and fire management plans

    Science.gov (United States)

    Leonard Charles

    1995-01-01

    To reduce the risk of wildfire in the California urban interface often requires actions that will be viewed by members of the public as having adverse effects on such resources as wildlife, vegetation, views, air quality, and recreational opportunities. These citizens can substantially delay and even thwart development of fire management plans. In developing such a...

  13. Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Westinghouse Electric Company Waste Isolation Division

    1999-01-01

    the requirements of this program plan, are also referenced. The DOE regulates its own activities for radiation protection of the public under the authority of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2011). The effluent and environmental monitoring activities prescribed by DOE Order 5400.5 and the DOE/EH-0173T guidance manual are designed to ensure that DOE facilities implement standards and regulations to protect members of the public and the environment against undue risk from radiation. Effluent and environmental monitoring also provide 1999 Environmental Monitoring Plan DOE/WIPP 99-2194 the data necessary to demonstrate compliance with applicable environmental protection regulations. Other federal agencies, such as the U.S. Environmental Protection Agency (EPA), are empowered through specific legislation to regulate certain aspects of DOE activities potentially affecting public health and safety or the environment. Presidential Executive Order 12088, Federal Compliance with Pollution Control Standards (43 FR 47707), requires the heads of executive agencies to ensure that all federal facilities and activities comply with applicable pollution control standards and to take all necessary actions for the prevention, control, and abatement of environmental pollution. Beyond statutory requirements, the DOE has established a general environmental protection policy. The Environmental Policy Statement (issued by then Secretary Herrington on January 8, 1986, and extended on January 7, 1987) describes the DOE's commitment to national environmental protection goals in that it conducts operations ''in an environmentally safe and sound manner . . . in compliance with the letter and spirit of applicable environmental statutes, regulations, and standards'' (DOE, 1986). This Environmental Policy Statement also states the DOE's commitment to ''good environmental management in all of its programs and at all of its facilities in order to correct existing environmental

  14. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    resources and to reduce the costs of communication. Planning and scheduling is generally a heavy consumer of time, memory and energy resources. This means careful thought must be given to how much planning and scheduling should be done on the sensors themselves, and how much to do elsewhere. The difficulty of planning and scheduling is exacerbated when reasoning about uncertainty. More time, memory and energy is needed to solve such problems, leading either to more expensive sensors, or suboptimal plans. For example, scientifically interesting events may happen at random times, making it difficult to ensure that sufficient resources are availanble. Since uncertainty is usually lowest in proximity to the sensors themselves, this argues for planning and scheduling onboard the sensors. However, cost minimization dictates sensors be kept as simple as possible, reducing the amount of planning and scheduling they can do themselves. Furthermore, coordinating each sensor's independent plans can be difficult. In the full presentation, we will critically review the planning and scheduling systems used by previously fielded sensor networks. We do so primarily from the perspective of the computational sciences, with a focus on taming computational complexity when operating sensor networks. The case studies are derived from sensor networks based on UAVs, satellites, and planetary rovers. Planning and scheduling considerations include multi-sensor coordination, optimizing science value, onboard power management, onboard memory, planning movement actions to acquire data, and managing communications.These case studies offer lessons for future designs of environmental sensor networks.

  15. Soil Management Plan for the Oak Ridge Y-12 National Security Complex Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    None

    2005-03-02

    This Soil Management Plan applies to all activities conducted under the auspices of the National Nuclear Security Administration (NNSA) Oak Ridge Y-12 National Security Complex (Y-12) that involve soil disturbance and potential management of waste soil. The plan was prepared under the direction of the Y-12 Environmental Compliance Department of the Environment, Safety, and Health Division. Soil disturbances related to maintenance activities, utility and building construction projects, or demolition projects fall within the purview of the plan. This Soil Management Plan represents an integrated, visually oriented, planning and information resource tool for decision making involving excavation or disturbance of soil at Y-12. This Soil Management Plan addresses three primary elements. (1) Regulatory and programmatic requirements for management of soil based on the location of a soil disturbance project and/or the regulatory classification of any contaminants that may be present (Chap. 2). Five general regulatory or programmatic classifications of soil are recognized to be potentially present at Y-12; soil may fall under one or more these classifications: (a) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) pursuant to the Oak Ridge Reservation (ORR) Federal Facilities Agreement; (b) Resource Conservation and Recovery Act (RCRA); (c) RCRA 3004(u) solid waste managements units pursuant to the RCRA Hazardous and Solid Waste Amendments Act of 1984 permit for the ORR; (d) Toxic Substances and Control Act-regulated soil containing polychlorinated biphenyls; and (e) Radiologically contaminated soil regulated under the Atomic Energy Act review process. (2) Information for project planners on current and future planned remedial actions (RAs), as prescribed by CERCLA decision documents (including the scope of the actions and remedial goals), land use controls implemented to support or maintain RAs, RCRA post-closure regulatory requirements for

  16. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  17. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    2007-01-01

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, 'Quality Assurance Requirements', ANSI/ASQC E4-2004, 'Quality Systems for Environmental Data and Technology Programs - Requirements with Guidance for Use', and ISO 14001-2004, 'Environmental Management Systems', have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, 'Quality Assurance Program', identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, 'QA Program Implementation', identifies the TAC organizations that have responsibility for implementing the QA

  18. Green knowledge management to support environmental sustainability

    International Nuclear Information System (INIS)

    Dornhoefer, Mareike-Jessica

    2017-01-01

    Sustainability, environmental management and green initiatives are topics which gradually developed into trends since the late 1980s, not only in research institutions, but also in public and private organizations. While the usage of energy and other resources are increasing, these organizations search for new possibilities to reduce the economic, ecologic and social burdens and consequences of office and production environments for employees and nature. While certified environmental management systems were established already in the 1990s, green approaches and technologies are only about 10 years old and steadily developing. Decisions about a fitting strategy and the support of suitable measures inside an organization always require knowledge provided for the decision makers. Furthermore it is of importance to record the environmental consequences of the operational business and to not only record data and information, but to create a context and deduce the knowledge for future activities. Based on this situation, the work addresses the main research question of how �classical'' knowledge management might be further developed or transformed into Green Knowledge Management and how it addresses the goals of sustainability, especially ecological sustainability, environmental management and green approaches alike? The definition of Green Knowledge Management consists of five factors, which are discussed systematically, explored conceptually and documented with the help of practical examples. Different knowledge management models and their respective building blocks are analyzed to deduce how knowledge processes might interact with environmental ones as well as green aspects. Also different types of knowledge management systems are analysed for their application possibilities. A planning and decision making tool in form of a three dimensional cube, the ''Green Knowledge Management Cube'' is introduced on a conceptual level and documented

  19. Introducing Urban Cultural Heritage Management into Urban Planning Management

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    <正>1. Concept comparison of urban cultural heritage management and urban planning management 1.1 Urban cultural heritage managementUrban cultural heritage management is an important component of cultural heritage management which is a systematic conser-vation to maintain the cultural value of cul-tural heritages so as to meet the enjoyment demand of the current or future generations. At present, the cultural heritage conserva-tion principles have been defined by many worldwide laws or charters, such as the Venice Charter of ICOMOS, the UNESCO World Heritage Convention, etc., and have been brought into legislation or policies in many countries. The fi nal goal of urban cul-tural heritage management is to find a real sustainable approach to manage heritages, which could benefit the heritages them-selves, the heritage managers and the local communities as well. Cultural heritage man-agement includes the management of urban cultural heritages, that of natural heritages in non-urban areas and that of intangible cultural heritages.1.2 Urban planning managementUrban planning management is a type of urban management. From the practical viewpoint, urban management should be an overall management which includes urban planning management, urban infrastructure and public facility management, urban en-vironment and public order management, etc., takes urban infrastructures and public resources as management object, and ischaracterized by the goal of exerting the comprehensive effects of economy, society and environment. While from the techni-cal viewpoint, urban planning management refers to the planning management executed by urban governments based on the relevant laws and regulations, including the manage-ment of urban land-use and that of different types of constructions. It actually means the organizing, guiding, controlling and coordinating process focusing on different construction projects in cities. The urban cultural heritage mentioned here includes all the physical

  20. Standard review plan for the review of environmental restoration remedial action quality assurance program plans

    International Nuclear Information System (INIS)

    1991-09-01

    This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the participant QAPPs. Use of the standard review plan will (1) help ensure that participant QAPPs contain the information required by DOE/RL-90-28, (2) aid program participant and DOE Field Office, Richland staff is ensuring that the information describing the participant's QAPP is complete, (3) help persons regarding DOE/RL- 90-28 to locate information, and (4) contribute to decreasing the time needed for the review process. In addition, the Standard Review Plan (SRP) ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate compliance of participant quality programs against DOE/RL-90-28

  1. CONTRIBUTIONS TO THE IMPLEMENTATION OF ENVIRONMENTAL MANAGEMENT SYSTEM WITHIN THE ECO TECHNOLOGIC ORGANIZATION

    Directory of Open Access Journals (Sweden)

    Gheorghe AMZA

    2012-05-01

    Full Text Available This paper presents contributions to the implementation of environmental management system within the eco technologic organization. SME type organization's environmental policies highlights the accomplishment of requirements of ISO 19001 standard, regarding pollution prevention, commitment in accordance to the law and if it is documented and can provide a framework for setting environmental objectives and targets. The audit may reveal whether it corresponds to the nature, scale and impact that activities, products and services of the organization have on the environment, or if it is implemented, maintained and communicated to all staff. This paper presents mainly the following: elements of environmental planning process, environmental planning process, place of environmental conservation in the general strategy of the organization

  2. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  3. Environmental Information System Baden-Wuerttemberg, RIPS 2016. Spatial information and planning system

    International Nuclear Information System (INIS)

    Weissenbach, Kurt; Czommer, Olaf; Ellmenreich, Bastian

    2016-01-01

    The Spatial Information and Planning System (RIPS), as the overarching component of the Environmental Information System Baden-Wuerttemberg (UIS BW), implements the environmental and nature conservation-specific geoinformation-related requirements taking into account applicable framework conditions. To this end, RIPS offers tailor-made services on the basis of a standardized and in transnational cooperation developed technical kit for the areas of geodata processing and management as well as the development and provision of software components with geo-functions and geodata services as part of the technical and information procedures. The coordination and steering takes place via project development offices, working groups and committees in close coordination with the departments of environmental and nature conservation administration as well as further cooperation and in coordination with other specialist administrations. Taking into account changed framework conditions and new geo-referenced requirements in UIS BW, the present RIPS concept focuses on future-oriented geofunction and geodata management in the field of environmental and nature conservation management as well as the provision of geo-specialized environmental and nature conservation data for policy makers, administrators and the public on innovative technologies Applications and Services. [de

  4. Midwest regional management plan

    International Nuclear Information System (INIS)

    Paton, R.F.

    1986-01-01

    In response to the Low-Level Radioactive Waste Policy Act of 1980, the States of Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio and Wisconsin formed the Midwest Interstate Low-Level Radioactive Waste Compact. One of the top priorities of the Compact Commission is the development of a comprehensive regional waste management plan. The plan consists of five major elements: (1) waste inventory; (2) waste stream projections; (3) analysis of waste management and disposal options; (4) development of a regional waste management system; and (5) selection of a host state(s) for future low-level waste facilities. When completed, the Midwest Management Plan will serve as the framework for future low-level radioactive waste management and disposal decisions

  5. Rural environmental planning in a family farm: education, extension and sustainability

    Directory of Open Access Journals (Sweden)

    Dayana Almeida

    Full Text Available ABSTRACT: Developing research, teaching and extension in university programs is fundamental to capacitate professionals for the challenging endeavors. Considering the importance of these three university functions as relevant learning practices, the objective of this study was to analyze qualitatively the development of teaching project proposals associated with extension activities, directed to the rural environmental planning in an Agricultural Production Unit, in order to identify the issues and their degree of applicability. Twenty project proposals were developed in the "Rural Environmental Planning" course to plan an Agricultural Production Unit, which were subsequently evaluated by the farmer. This discipline is part of the Bachelor's degree course in Environmental Management and Analysis of the Universidade Federal de São Carlos. The projects followed qualitative research methods using the systemic and participatory approach. At the end of the process the farmer answered an evaluation matrix of the projects. Development of the projects was particularly important for the students and for their knowledge on the various topics covered, which also resulted in factual improvement perspectives in the Agricultural Production Unit. Construction of knowledge was participatory and integrated between the students and farmer.

  6. Environmental health action plan for Europe

    International Nuclear Information System (INIS)

    1994-06-01

    This Environmental Health Action Plan for Europe was endorsed by the second European Conference on Environment and Health, held in Helsinki, 20 to 22 June 1994. It sets out directions for the attainment of long term environment and health policy objectives define in the European Charter on Environment and Health. The Action Plan is primarily addressed at the public health and environmental protection sectors. 10 refs, 4 figs, 2 tabs

  7. Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective.

    Science.gov (United States)

    Türkay, Metin; Saraçoğlu, Öztürk; Arslan, Mehmet Can

    2016-01-01

    Supply chain management that considers the flow of raw materials, products and information has become a focal issue in modern manufacturing and service systems. Supply chain management requires effective use of assets and information that has far reaching implications beyond satisfaction of customer demand, flow of goods, services or capital. Aggregate planning, a fundamental decision model in supply chain management, refers to the determination of production, inventory, capacity and labor usage levels in the medium term. Traditionally standard mathematical programming formulation is used to devise the aggregate plan so as to minimize the total cost of operations. However, this formulation is purely an economic model that does not include sustainability considerations. In this study, we revise the standard aggregate planning formulation to account for additional environmental and social criteria to incorporate triple bottom line consideration of sustainability. We show how these additional criteria can be appended to traditional cost accounting in order to address sustainability in aggregate planning. We analyze the revised models and interpret the results on a case study from real life that would be insightful for decision makers.

  8. Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective

    Science.gov (United States)

    Türkay, Metin; Saraçoğlu, Öztürk; Arslan, Mehmet Can

    2016-01-01

    Supply chain management that considers the flow of raw materials, products and information has become a focal issue in modern manufacturing and service systems. Supply chain management requires effective use of assets and information that has far reaching implications beyond satisfaction of customer demand, flow of goods, services or capital. Aggregate planning, a fundamental decision model in supply chain management, refers to the determination of production, inventory, capacity and labor usage levels in the medium term. Traditionally standard mathematical programming formulation is used to devise the aggregate plan so as to minimize the total cost of operations. However, this formulation is purely an economic model that does not include sustainability considerations. In this study, we revise the standard aggregate planning formulation to account for additional environmental and social criteria to incorporate triple bottom line consideration of sustainability. We show how these additional criteria can be appended to traditional cost accounting in order to address sustainability in aggregate planning. We analyze the revised models and interpret the results on a case study from real life that would be insightful for decision makers. PMID:26807848

  9. Managing environmental and health impacts of uranium mining

    Energy Technology Data Exchange (ETDEWEB)

    Vance, R.E.; Cameron, R., E-mail: robert.vance@oecd.org, E-mail: ron.cameron@oecd.org [OECD Nuclear Energy Agency (France)

    2014-07-01

    As the raw material that fuels nuclear power plants that generate significant amounts of electricity with full life cycle carbon emissions as low as renewable energy sources, uranium is a valuable commodity. Yet uranium mining remains controversial, principally because of environmental and health impacts created when mining was undertaken by governments to meet Cold War strategic requirements. Uranium mining is conducted under significantly different circumstances today. Since the era of military production, societal expectations of environmental protection and the safety of workers and the public have evolved as the outcomes of the early era of mining became apparent, driving changes in regulatory oversight and mining practices. Key aspects of leading practice uranium mining are presented (conventional worker health and safety, worker radiation protection, public health and safety, water quality, tailings and waste rock management) and compared with historic practices to demonstrate the scale of differences. The application of additional aspects of uranium mine life cycle management (public consultation, environmental impact assessment, analysis of socio-economic impacts/benefits, environmental monitoring, financial assurance, product transport, security and safeguards, emergency planning and knowledge transfer), introduced as the industry matured, enhance overall management practices for the long term. Results from several case studies show that improved management of key aspects of uranium mining, combined with the incorporation of new life cycle parameters, have transformed the industry into the most regulated and arguably one of the safest and environmentally responsible types of mining in the world. (author)

  10. Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Hunter, S.W.; Gallegos, G.M.; Surano, K.A.; Lamson, K.C.; Tate, P.J.; Balke, B.K.; Biermann, A.H.; Hoppes, W.G.; Fields, B.C.; Gouveia, F.J.; Berger, R.L.; Miller, F.S.; Rueppel, D.W.; Sims, J.M.

    1992-04-01

    The primary tasks of the environmental monitoring section (EMS) Livermore National Laboratory (LLNL) are: effluent monitoring of air, sewer, and NPDES water. Surveillance monitoring of soil, vegetation and foodstuff, water, air particulate, and air tritium. Radiation monitoring, dose assessment, emergency response, quality assurance, and reporting. This report describes LLNL and the monitoring plan

  11. Revised draft Hanford remedial action environmental impact statement and comprehensive land-use plan

    International Nuclear Information System (INIS)

    1999-01-01

    This report evaluates the potential environmental impacts associated with implementing a comprehensive land-use plan for the Hanford Site for at least the next 50 years. With the exception of the required No-Action Alternative, each of the six alternatives presented represents a Tribal, Federal, state, or local agency's Preferred Alternative. Each alternative is presented separately. The DOE's Preferred Alternative anticipates multiple uses of the Hanford Site, including: consolidating waste management operations in the Central Plateau, allowing industrial development in the eastern and southern portions of the site, increasing recreational access to the Columbia River, and expanding the Saddle Mountain National Wildlife Refuge to include all of the Wahluke Slope (managed by the US Fish and Wildlife Service). The Hanford Site occupies 1,517 square kilometers (km 2 ) (586 square miles [mi 2 ]) in southeastern Washington. Today, the Hanford Site has diverse missions associated with environmental restoration, waste management, and science and technology. These missions have resulted in the growing need for a comprehensive, long-term approach to planning and development for the Site

  12. Marine Spatial Planning: Norway´s management plans

    OpenAIRE

    Hoel, Alf Håkon; Olsen, Erik

    2010-01-01

    Since the adoption of a government white paper on ocean governance in 2001, Norway has worked on the development and implementation of marine spatial planning in the format of regional management plans. Management plans for the Barents Sea and the oceans off northern Norway and the Norwegian Sea were adopted in 2006 and 2009, respect...

  13. Quality management status of national radiation environmental monitoring network and strategy for development

    International Nuclear Information System (INIS)

    Huang Renjie; Zhang Rongsuo; Ni Shiying; Shen Gang

    2009-01-01

    During the period of 10th five-year plan, MEP has constructed a national radiation environmental monitoring network. In the running of the network, quality management on monitoring data is of vital importance. So all the members of the radiation environmental monitoring network are required to ensure the quality of monitoring method, equipment, reagent,quality of personnel, data processing and information management and so on. Thus the monitoring result would be typical and accuracy in science. The article introduced in detail the quality management status of the National Radiation Environmental Monitoring Network and put forward the strategy for development from the institutionalized and large-scale point of view of radioactive environmental monitoring work. (authors)

  14. 77 FR 39181 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Science.gov (United States)

    2012-07-02

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District (MDAQMD) and Yolo-Solano Air Quality Management District (YSAQMD) AGENCY: Environmental Protection Agency (EPA... Air Quality Management District. (1) Rule 1165, ``Glass Melting Furnaces,'' amended on August 25, 2008...

  15. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Butte County Air Quality Management...

  16. 77 FR 11990 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Science.gov (United States)

    2012-02-28

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District and Yolo-Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Mojave Desert Air Quality Management...

  17. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District...

  18. Environmental management system in companies

    International Nuclear Information System (INIS)

    Bonanno, C.

    1995-01-01

    The environmental management system, as the whole coordinated initiatives 'environmental oriented' introduced by companies in their organization, is discussed. Strategic weight that companies have to be present at the environmental management system is enlisted. Finally, the new professional figures of environmental technicians and environmental manager is discussed

  19. Sandia National Laboratories, California Environmental Management System program manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2012-03-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has

  20. Sandia National Laboratories, California Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2011-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories

  1. Environmental Development Plan: uranium enrichment

    International Nuclear Information System (INIS)

    1979-09-01

    This Environmental Development Plan identifies and examines the environmental, health, safety, and socioeconomic concerns and corresponding requirements associated with the DOE research, development, demonstration, and operation of the Uranium Enrichment program, including the gaseous diffusion process, the centrifuge process, centrifuge rotor fabrication, and related research and development activities

  2. Environmental monitoring plan - environmental monitoring section. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Wilt, G.C. [ed.; Tate, P.J.; Brigdon, S.L. [and others

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures.

  3. Environmental monitoring plan - environmental monitoring section. Revision 1

    International Nuclear Information System (INIS)

    Wilt, G.C.; Tate, P.J.; Brigdon, S.L.

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures

  4. Environmental assessment, continual improvement and adaptive management within the AREVA sustainable development framework

    International Nuclear Information System (INIS)

    Rosaasen, A.; Frostad, S.

    2006-01-01

    COGEMA Resources Inc. (which is part of the AREVA Group) is a Canadian company with its head office in Saskatoon, Saskatchewan. It owns and operates mining and milling facilities in northern Saskatchewan, which produce uranium concentrate. The McClean Lake Operation commenced production in 1999 and its environmental management system represents an integrated approach to environmental assessment, continual improvement and adaptive management based on operational results. In Canada, sustainable development is promoted through the application of the Canadian Environmental Assessment Act (CEAA). Environmental Assessment (EA) is a planning tool, which incorporates environmental considerations before irrevocable decisions are taken. The basic tenet of the Act is the determination of whether the potential environmental effects of a project are adverse, significant and likely, taking into consideration mitigation measures. Thus, project planning and design entails an iterative process that incorporates mitigation measures to minimize potentially significant adverse effects. As part of the EA process conservative approaches are taken to predict potential effects. Several important elements are generated through the EA process including: a set of environmental effects predictions, a compliance and environmental effects monitoring program, a follow-up program to address uncertainties in the prediction of environmental effects, and the identification of contingency measures that could be implemented should non-conservative assumptions be identified in the original assessment framework. The challenge is to integrate each of these elements into the environmental management framework of the operating facility and develop an iterative mechanism to evaluate operational performance relative to what was originally predicted. In Saskatchewan, a requirement of operational licenses is the periodic evaluation of the 'Status of the Environment' surrounding operational facilities. These

  5. ENVIRONMENTAL SYSTEMS MANAGEMENT: TOWARDS A NEW SCIENCE OF SUSTAINABLE ENVIRONMENTAL MANAGEMENT

    Science.gov (United States)

    Environmental Systems Management (ESM) is the management of environmental problems at the systems level fully accounting for the multi-dimensional nature of the environment. This includes socio-economic dimensions as well as the usual physical and life science aspects of environm...

  6. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  7. Improvement of environmental management incentives for small and medium-sized enterprises

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Kee Bok; Lee, Seung Kyu; Lim, Chae Woon; Chung, Ho Sun [Korea Environment Institute, Seoul (Korea)

    1998-12-01

    The developed countries have been prepared the national innovation for sustainable development for a long time. The international advanced enterprises, such as multinational enterprises, are enhancing the active and strategic environmental management. However, in spite of such changes in the world, small and middle-sized enterprises do not show any substantial changes. It is true that most of enterprises do not recognize the need of environmental management. Although they have intention for environmental improvement, it is also true that they do not have any strength to maintain effective management. Moreover, with over 99% of small and middle-sized enterprises among entire enterprises in Korea, it is hardly possible to establish an effective regulation system. The purpose of this study is to make a policy plan to induce the development of environmental friendly small and middle-sized enterprises under the recognition of such problems. 138 refs., 4 figs., 195 tabs.

  8. Limits of environmental management for the brick marker industry of municipality of Itagui -Antioquia

    International Nuclear Information System (INIS)

    Caballero A, Humberto; Machado, Jenny; Paniagua P, Augusto

    2004-01-01

    The brick maker activity in the municipality of Itagui this located within the Jabalcona's river basin (river Medellin's affluent), this is the two types, artisan and technified, each one of them are technical economic and socially different but they generate negative environmental impacts to the atmosphere. An environmental management adapted is directly related with three sectors, they are the institutions (the environmental authorities, the universities and association of brick marker united AS - LUNSA, the community and the companies, they must have clear environmental management guidelines for each work that generates environmental impacts negatives. This paper shows environmental management guidelines for the brick maker industry in the municipality of Itagui, with base in the territorial ordaining plan (2000-2003) like a contribution to the environmental ordaining of the municipality

  9. 75 FR 25876 - Notice of Intent To Prepare Resource Management Plans for the Beaver Dam Wash and Red Cliffs...

    Science.gov (United States)

    2010-05-10

    ... Intent To Prepare Resource Management Plans for the Beaver Dam Wash and Red Cliffs National Conservation... Environmental Impact Statement, Utah AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent..., intends to prepare Resource Management Plans (RMP) for the Beaver Dam Wash and the Red Cliffs National...

  10. A simplified method for quantitative assessment of the relative health and safety risk of environmental management activities

    International Nuclear Information System (INIS)

    Eide, S.A.; Smith, T.H.; Peatross, R.G.; Stepan, I.E.

    1996-09-01

    This report presents a simplified method to assess the health and safety risk of Environmental Management activities of the US Department of Energy (DOE). The method applies to all types of Environmental Management activities including waste management, environmental restoration, and decontamination and decommissioning. The method is particularly useful for planning or tradeoff studies involving multiple conceptual options because it combines rapid evaluation with a quantitative approach. The method is also potentially applicable to risk assessments of activities other than DOE Environmental Management activities if rapid quantitative results are desired

  11. Project management plan for the gunite and associated tanks treatability studies project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-12-01

    This plan for the Gunite and Associated Tanks (GAAT) Treatability Studies Project satisfies the requirements of the program management plan for the Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program as established in the Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program. This plan is a subtier of several other ER documents designed to satisfy the US Department of Energy (DOE) Order 4700.1 requirement for major systems acquisitions. This project management plan identifies the major activities of the GAAT Treatability Studies Project; establishes performance criteria; discusses the roles and responsibilities of the organizations that will perform the work; and summarizes the work breakdown structure, schedule, milestones, and cost estimate for the project

  12. Wildland Fire Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Schwager, K. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-09-30

    The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

  13. SOCIAL AND ENVIRONMENTAL PROBLEMS AND INSTITUTIONAL ASPECTS OF URBAN MANAGEMENT IN PALMAS (TO

    Directory of Open Access Journals (Sweden)

    Gustavo Muller Gonçalves Moura

    2012-07-01

    Full Text Available This work aims to meet the urban environmental management in Palmas and establish consistency with the socio-environmental problems and needs and their efficiency in monitoring and controlling the environment. Palmas, the newest planned city in Brazil is facing conflicts that urban planning could not prevent the peripheral expansion and separation of social classes determined the absence or little coverage of basic infrastructure services like water supply, sewerage, collection and disposal of garbage and the deficiency in the management and maintenance of green areas. From this backdrop, we carried out analysis on the institutions and the environmental reality of the city and proposed a model for the municipal environment, based on the Statute of the city, and also suggestions to formulate public policies and proposals for immediate action, aimed at improve the quality of life of Palmas.

  14. Environmental health research in Japan - management of environmental risks

    Energy Technology Data Exchange (ETDEWEB)

    Nakamura, Masahisa [Lake Biwa Research Institute (Japan)

    1997-12-31

    Briefly discussed the topics on emerging environmental health risks, their assessment and management, with special emphasis on groundwater management , environmental contamination, source protection, new drinking water and ambient water quality standards; and sophistication in instrumentation in environmental quality measurements, hazards and risk assessment and control, technology development in environmental health risk management.

  15. Environmental health research in Japan - management of environmental risks

    International Nuclear Information System (INIS)

    Masahisa Nakamura

    1996-01-01

    Briefly discussed the topics on emerging environmental health risks, their assessment and management, with special emphasis on groundwater management , environmental contamination, source protection, new drinking water and ambient water quality standards; and sophistication in instrumentation in environmental quality measurements, hazards and risk assessment and control, technology development in environmental health risk management

  16. 300 Area Integrated Field-Scale Subsurface Research Challenge (IFRC) Field Site Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Freshley, Mark D.

    2008-12-31

    Pacific Northwest National Laboratory (PNNL) has established the 300 Area Integrated Field-Scale Subsurface Research Challenge (300 Area IFRC) on the Hanford Site in southeastern Washington State for the U.S. Department of Energy’s (DOE) Office of Biological and Environmental Research (BER) within the Office of Science. The project is funded by the Environmental Remediation Sciences Division (ERSD). The purpose of the project is to conduct research at the 300 IFRC to investigate multi-scale mass transfer processes associated with a subsurface uranium plume impacting both the vadose zone and groundwater. The management approach for the 300 Area IFRC requires that a Field Site Management Plan be developed. This is an update of the plan to reflect the installation of the well network and other changes.

  17. Environmental Monitoring Plan - February 2016

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bertoldo, N. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Blake, R. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fish, C. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Grayson, A. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Griffin, D. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jones, H. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Patterson, L. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Revelli, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rosene, C. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wegrecki, T M; Williams, R A; Wilson, K R

    2016-02-08

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection oft/ic Pubile and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the hiota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements.

  18. Environmental management

    NARCIS (Netherlands)

    Guicherit, R.

    1996-01-01

    Elements of a national environmental management system include: • monitoring networks to establish the prevailing environmental quality; • emission inventories, and projected emission inventories based on population growth, increase of traffic density, and economie growth; taking into account

  19. Analysis on the applicability of environmental management tools for the management of natural wetlands within Colombia

    International Nuclear Information System (INIS)

    Herrera A, Maria A; Sepulveda L, Monica V; Aguirre R, Nestor J

    2008-01-01

    As a result of an investigation of scientific and legislative information about environmental management of natural wetlands in Colombia, analyzes the applicability of the administration tools employed in the integrated management of these ecosystems. For this work, there were identified key categories and sub categories of analysis, based on a ranking of natural inland wetlands in the country and its current state, the review of existing environmental regulations, also discussed some wetland management plans and finally, the identification of the scientific groups in Colciencias conducting studies on this subject. The information will be systematized bases on these results, thereby generating an approximation to a proposal of analysis that will help to rulers and scientist to guide the future investigation and policy about the management of wetlands in the country.

  20. The Barriers for Voluntary Environmental Management Systems—The Case of EMAS in Hospitals

    Directory of Open Access Journals (Sweden)

    Christin Seifert

    2018-05-01

    Full Text Available The adoption of formal environmental management systems (EMS according to EMAS (Eco-Management and Audit Scheme represents a voluntary approach that aims to increase corporate environmental performance. Though EMAS can offer several advantages for organizations, registration numbers are falling. In the hospital sector, the dissemination of EMAS is low. The question arises as to what hinders hospitals when planning, implementing, and maintaining such voluntary environmental management initiatives. The results from interviews with environmental managers in EMAS registered hospitals reveal problems such as high initial effort for creation of the required documents, or lacking knowledge and staff awareness. The barriers are presented in a model synthesizing the problems chronologically on the organizational, group, and individual level. The challenges for the adoption of EMAS as a voluntary environmental management approach in hospitals are discussed. This paper contributes by creating an understanding of the barriers organizations might face when implementing an EMS. Thus, measures to actively manage and overcome barriers can be developed by organizations, consultants, reviewers, policy makers, and researchers.

  1. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Vogelsang, Stefan; Freudenberg, Peggy

    2015-01-01

    This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data.......This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data....

  2. 75 FR 22836 - Notice of Intent To Prepare a Resource Management Plan for the Eastern Washington and San Juan...

    Science.gov (United States)

    2010-04-30

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORW00000 L16100000.DO0000; HAG10-0117] Notice of Intent To Prepare a Resource Management Plan for the Eastern Washington and San Juan Planning... Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with the National Environmental Policy...

  3. An Integrated Decentralized Energy Planning Model considering Demand-Side Management and Environmental Measures

    Directory of Open Access Journals (Sweden)

    Seyed Mahmood Kazemi

    2013-01-01

    Full Text Available Decentralized energy planning (DEP is looked upon as an indisputable opportunity for energy planning of villages, isolated islands, and far spots. Nonetheless, at this decentralized planning level, the value of demand-side resources is not fairly examined, despite enjoying great advantages. Therefore, the core task of this study is to integrate demand-side resources, as a competing solution against supply-side alternatives, with decentralized energy planning decisions and demonstrate the rewarding role it plays. Moreover, sustainability indicators (SIs are incorporated into DEP attempts in order to attain sustainable development. It is emphasized that unless these indicators are considered at lower energy planning levels, they will be ignored at higher planning levels as well. Hence, to the best knowledge of the authors, this study for the first time takes into account greenhouse gas (GHG emissions produced by utilization of renewable energies in DEP optimization models. To address the issues mentioned previously, multiobjective linear programming model along with a min-max goal programming approach is employed. Finally, using data taken from the literature, the model is solved, and the obtained results are discussed. The results show that DSM policies have remarkably contributed to significant improvements especially in terms of environmental indicators.

  4. IRP methods for Environmental Impact Statements of utility expansion plans

    International Nuclear Information System (INIS)

    Cavallo, J.D.; Hemphill, R.C.; Veselka, T.D.

    1992-01-01

    Most large electric utilities and a growing number of gas utilities in the United States are using a planning method -- Integrated Resource Planning (IRP) - which incorporates demand-side management (DSM) programs whenever the marginal cost of the DSM programs are lower than the marginal cost of supply-side expansion options. Argonne National Laboratory has applied the IRP method in its socio-economic analysis of an Environmental Impact Statement (EIS) of power marketing for a system of electric utilities in the mountain and western regions of the United States. Applying the IRP methods provides valuable information to the participants in an EIS process involving capacity expansion of an electric or gas utility. The major challenges of applying the IRP method within an EIS are the time consuming and costly task of developing a least cost expansion path for each altemative, the detailed quantification of environmental damages associated with capacity expansion, and the explicit inclusion of societal-impacts to the region

  5. Waste feed delivery environmental permits and approvals plan

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, that may affect waste feed delivery (WFD) activities in the Hanford Site's Tank Waste Remediation System (TWRS). This plan expands on the summary level information in the Tank Waste Remediation System Environmental Program Plan (HNF 1773) to address requirements that are most pertinent to WFD. This plan outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for WFD to proceed. Appendices at the end of this plan provide preliminary cost and schedule estimates for implementing the selected strategies. The rest of this section summarizes the scope of WFD activities, including important TWRS operating information, and describes in more detail the objectives, structure, and content of this plan

  6. Managing Environmentally-Assisted Fatigue in U. S. Plants

    International Nuclear Information System (INIS)

    Gilman, T. D.

    2014-01-01

    Nuclear plants in the United States were originally licensed by the Nuclear Regulatory Commission (NRC) for 40 years of operation, but most of these plans have or are planning on renewing their license to 60 years. Plants are required by federal law to manage the aging effects of systems, structures and components in the scope of license renewal. One of the aging effects is environmentally-assisted fatigue of the primary system vessels and piping. This article discusses the strategies that U. S. utilities have utilized in order to safety NRC concerns with respect to fatigue damage in nuclear plants. (Author)

  7. Electric utility resource expansion planning using environmental externalities

    International Nuclear Information System (INIS)

    Mitchell, D.

    1992-01-01

    This paper describes the recent experience of San Diego Gas ampersand Electric Company using environmental externalities in the expansion planning of its electrical system. This is the first time that this method of planning has been used in the electric utility industry in California. The paper reviews the conceptual development of the monetary values for environmental externalities and shows how the application of these values modifies the resource selection process. This paper should be of interest to professionals involved in policy issues relating to the use of environmental externalities as a means to improve the environment. The experience gained through this analyses should also benefit electric utility personnel involved in planning, and regulators interested in planning

  8. Oak Ridge National Laboratory Waste Management Plan, fiscal year 1994

    International Nuclear Information System (INIS)

    Turner, J.W.

    1993-12-01

    US Department of Energy (DOE) Order 5820.2A was promulgated in final form on September 26, 1988. The order requires heads of field organizations to prepare and to submit updates on the waste management plans for all operations under their purview according to the format in Chap. 6, open-quotes Waste Management Plan Outline.close quotes These plans are to be submitted by the DOE Oak Ridge Operations Office (DOE-ORO) in December of each year and distributed to the DP-12, ES ampersand H-1, and other appropriate DOE Headquarters (DOE-HQ) organizations for review and comment. This document was prepared in response to this requirement for fiscal year (FY) 1994. The Oak Ridge National Laboratory (ORNL) waste management mission is reduction, collection, storage, treatment, and disposal of DOE wastes, generated primarily in pursuit of ORNL missions, in order to protect human health and safety and the environment. In carrying out this mission, waste management staff in the Waste Management and Remedial Action Division (WMRAD) will (1) guide ORNL in optimizing waste reduction and waste management capabilities and (2) conduct waste management operations in a compliant, publicly acceptable, technically sound, and cost-efficient manner. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of this document is compilation and consolidation of information on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what activities are planned for FY 1994, and how all of the activities are

  9. The self employed occupational and environmental health nurse: maximizing business success by managing financial resources.

    Science.gov (United States)

    Rainer, S R; Papp, E

    2000-04-01

    The occupational and environmental health nurse entrepreneur can avoid business failure by engaging in a planning process that maximizes financial resources. Successful financial management involves understanding key financial reports and using those reports as management tools to "keep score" on the business. The prices the occupational and environmental health nurse entrepreneur charges for services will have a direct effect on the success of the business. Payroll, earnings, and expense records are useful management tools to help the occupational and environmental health nurse entrepreneur track the business and meet legal requirements.

  10. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  11. 78 FR 18853 - Revision to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-03-28

    ... California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental... revision to the South Coast Air Quality Management District (SCAQMD) portion of the California State...) * * * (411) * * * (i) * * * (F) South Coast Air Quality Management District. (1) Rule 463, ``Organic Liquid...

  12. Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective.

    Directory of Open Access Journals (Sweden)

    Metin Türkay

    Full Text Available Supply chain management that considers the flow of raw materials, products and information has become a focal issue in modern manufacturing and service systems. Supply chain management requires effective use of assets and information that has far reaching implications beyond satisfaction of customer demand, flow of goods, services or capital. Aggregate planning, a fundamental decision model in supply chain management, refers to the determination of production, inventory, capacity and labor usage levels in the medium term. Traditionally standard mathematical programming formulation is used to devise the aggregate plan so as to minimize the total cost of operations. However, this formulation is purely an economic model that does not include sustainability considerations. In this study, we revise the standard aggregate planning formulation to account for additional environmental and social criteria to incorporate triple bottom line consideration of sustainability. We show how these additional criteria can be appended to traditional cost accounting in order to address sustainability in aggregate planning. We analyze the revised models and interpret the results on a case study from real life that would be insightful for decision makers.

  13. Development of planning methods for demand-side management (DSM)

    International Nuclear Information System (INIS)

    Kaerkkaeinen, S.; Kekkonen, V.; Rissanen, P.

    1995-01-01

    The interest of utilities and governmental agencies in Demand-side management (IDSM) and Integrated Resource Planning (IRP) has increased during recent years also in Finland. From the governmental point of view, the main reason for this has been concern about the environmental effects of electricity supply and consumption. Utilities are mainly interested in cost reductions in electricity supply and distribution caused by DSM. Also improved service to the customer due to DSM has increasing value to utilities. In this project, the main target has been to develop and assess methods for DSM planning from the utility point of view. The final goal is to integrate these methods into the strategic planning of electric utilities

  14. Management Planning In Transport

    Directory of Open Access Journals (Sweden)

    Teodor Perić

    2004-07-01

    Full Text Available Management planning in traffic and other activities includesa choice of missions and goals, as well as actions undertakenfor their realisation. It requires decision-making, that is,a choice among alternative trends of future actions. Therefore,planning and control are closely related.There are several types of plans: purposes or missions,goals, strategies, policies, procedures, rules, programs and calculations.Once managers become aware of the opportunities, they rationallyplan the setting of the goals and assumptions about thecurrent and future environment, finding and evaluating alternativetrends, and selecting the one that is to be followed.Therefore, planning means looking ahead and controlmeans looking backwards. The concept of overall planning,thus including traffic planning, illustrates the approach to managementwhich is based on the achieved goals.

  15. Environmental management in public hospitals: Environmental management in Colombia

    Directory of Open Access Journals (Sweden)

    Juan Pablo Rodríguez-Miranda

    2016-10-01

    Conclusions: Hospitals can apply broader environmental management instruments, including life cycle analysis of their products and services and monitoring of the carbon footprint; they may also take into account the different areas of environmental impact of their operation.

  16. Lake Mead National Recreational Area air tour management plan and planning and National Environmental Policy Act scoping document

    Science.gov (United States)

    2004-04-19

    The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of an Air Tour Management Plan (ATMP) for Lake Mead National Recreation Area (LAME) pursuant to the National Parks Air Tour ...

  17. Planning Environmental Impact Assessment Orienting Sustainable Development:Opportunities and Challenges

    Institute of Scientific and Technical Information of China (English)

    Sun Yanjun; Chen Xingeng; Bao Yun; Peng Xiaochun; Gao Changbo

    2005-01-01

    Strategic Environmental Assessment is a frontier subject in the field of Environmental Impact Assessment. In the past two decades, especially in recent years, much more importance has been attached to Strategic Environmental Assessment. The Environmental Impact Assessment Law of the P.R.China which was promulgated provides a great opportunity for the development of Planning Environmental Impact Assessment and brings great challenges for the development of traditional Project Environmental Impact Assessment and Planning Environmental Impact Assessment at the same time.In order to promote the implementation of"The EIA Law", the inherent limitations of Project Environmental Impact Assessment must be identified sufficiendy and the theory research and practice of Planning Environmental Impact Assessment should be strengthened as well. Measures should be taken currendy to enforce the operation system. The authors wish to offer a few references to the progress and implementation of Planning Environmental Impact Assessment in China.

  18. Integration of landslide susceptibility products in the environmental plans

    Science.gov (United States)

    Fiorucci, Federica; Reichenbach, Paola; Rossi, Mauro; Cardinali, Mauro; Guzzetti, Fausto

    2015-04-01

    Landslides are one of the most destructive natural hazard that causes damages to urban area worldwide. The knowledge of where a landslide could occur is essential for the strategic management of the territory and for a good urban planning . In this contest landslide susceptibility zoning (LSZ) is crucial to provide information on the degree to which an area can be affected by future slope movements. Despite landslide susceptibility maps have been prepared extensively during the last decades, there are few examples of application is in the environmental plans (EP). In this work we present a proposal for the integration of the landslide inventory map with the following landslide susceptibility products: (i) landslide susceptibility zonation , (ii) the associated error map and (iii) the susceptibility uncertainty map. Moreover we proposed to incorporate detailed morphological studies for the evaluation of landslide risk associated to local parceling plan. The integration of all this information is crucial for the management of landslide risk in urban expansions forecasts. Municipality, province and regional administration are often not able to support the costs of landslide risk evaluation for extensive areas but should concentrate their financial resources to specific hazardous and unsafe situations defined by the result of the integration of landslide susceptibility products. Zonation and detail morphological analysis should be performed taking into account the existing laws and regulations, and could become a starting point to discuss new regulations for the landslide risk management.

  19. National ignition facility environment, safety, and health management plan

    International Nuclear Information System (INIS)

    1995-11-01

    The ES ampersand H Management Plan describes all of the environmental, safety, and health evaluations and reviews that must be carried out in support of the implementation of the National Ignition Facility (NIF) Project. It describes the policy, organizational responsibilities and interfaces, activities, and ES ampersand H documents that will be prepared by the Laboratory Project Office for the DOE. The only activity not described is the preparation of the NIF Project Specific Assessment (PSA), which is to be incorporated into the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (PEIS). This PSA is being prepared by Argonne National Laboratory (ANL) with input from the Laboratory participants. As the independent NEPA document preparers ANL is directly contracted by the DOE, and its deliverables and schedule are agreed to separately with DOE/OAK

  20. Project management plan for Reactor 105-C Interim Safe Storage project

    International Nuclear Information System (INIS)

    Plagge, H.A.

    1996-09-01

    Reactor 105-C (located on the Hanford Site in Richland, Washington) will be placed into an interim safe storage condition such that (1) interim inspection can be limited to a 5-year frequency; (2) containment ensures that releases to the environmental are not credible under design basis conditions; and (3) final safe storage configuration shall not preclude or significantly increase the cost for any decommissioning alternatives for the reactor assembly.This project management plan establishes plans, organizational responsibilities, control systems, and procedures for managing the execution of Reactor 105-C interim safe storage activities to meet programmatic requirements within authorized funding and approved schedules