WorldWideScience

Sample records for environmental licensing processes

  1. The Brazilian Audit Tribunal's role in improving the federal environmental licensing process

    International Nuclear Information System (INIS)

    Lima, Luiz Henrique; Magrini, Alessandra

    2010-01-01

    This article describes the role played by the Brazilian Audit Tribunal (Tribunal de Contas da Uniao - TCU) in the external auditing of environmental management in Brazil, highlighting the findings of an operational audit conducted in 2007 of the federal environmental licensing process. Initially, it records the constitutional and legal framework of Brazilian environmental licensing, describing the powers and duties granted to federal, state and municipal institutions. In addition, it presents the responsibilities of the TCU in the environmental area, comparing these with those of other Supreme Audit Institutions (SAI) that are members of the International Organization of Supreme Audit Institutions (INTOSAI). It also describes the work carried out in the operational audit of the Brazilian environmental licensing process and its main conclusions and recommendations. Finally, it draws a parallel between the findings and recommendations made in Brazil with those of academic studies and audits conducted in other countries.

  2. The importance of environmental education in the process of nuclear and environmental licensing of nuclear facilities

    International Nuclear Information System (INIS)

    Araujo, Jefferson Borges; Ribeiro, Katia Maria Bruno

    2009-01-01

    Today, there is a thread with regard to the global environment. To reduce the environmental impact due to spending supplies to meet the basic needs of the global population. Can be considered as the power of these needs and in this context, the environmental impact occurs by the use of fossil fuels and loss of land for use of water resources. To minimize these impacts, governments are establishing appropriate laws towards the use of renewable energy. However it appears that there is still a great distance between the established law and implementation in practice. In this context nuclear energy is an attractive option, both economic and environmental. The facilities that are somehow associated with nuclear power plants are classified as radioactive or nuclear. These facilities are subject to two licensing procedures: Environmental (by IBAMA) and Nuclear (by CNEN). Nuclear installations such as nuclear power plants Angra 1 and 2, deposits and tailings facilities of the nuclear fuel cycle in Rezende that are more the attention of the population. As part of these processes are reports of analysis of safety and environmental impacts and socio-economic (EIA/RIMA RFAS), which are available to the public and then discussed at public hearings, where there is the opportunity for questions on these reports. These questions are mainly related with the social-environmental and economic due to construction and operation of these facilities. This work is a research, discussing the law, identifying the difficulties in the licensing process and presents a discussion on the importance of environmental education at all school levels, for adult audiences and is a connection between the environmental education and process of environmental licensing and nuclear, showing how the popular consciousness more informed can better discuss issues associated with these licenses, understand the advantages and disadvantages and obtain benefits. (author)

  3. Application of probabilistic risk assessment in nuclear and environmental licensing processes of nuclear reactors in Brazil

    International Nuclear Information System (INIS)

    Mata, Jonatas F.C. da; Vasconcelos, Vanderley de; Mesquita, Amir Z.

    2015-01-01

    The nuclear accident at Fukushima Daiichi, occurred in Japan in 2011, brought reflections, worldwide, on the management of nuclear and environmental licensing processes of existing nuclear reactors. One of the key lessons learned in this matter, is that the studies of Probabilistic Safety Assessment and Severe Accidents are becoming essential, even in the early stage of a nuclear development project. In Brazil, Brazilian Nuclear Energy Commission, CNEN, conducts the nuclear licensing. The organism responsible for the environmental licensing is Brazilian Institute of Environment and Renewable Natural Resources, IBAMA. In the scope of the licensing processes of these two institutions, the safety analysis is essentially deterministic, complemented by probabilistic studies. The Probabilistic Safety Assessment (PSA) is the study performed to evaluate the behavior of the nuclear reactor in a sequence of events that may lead to the melting of its core. It includes both probability and consequence estimation of these events, which are called Severe Accidents, allowing to obtain the risk assessment of the plant. Thus, the possible shortcomings in the design of systems are identified, providing basis for safety assessment and improving safety. During the environmental licensing, a Quantitative Risk Analysis (QRA), including probabilistic evaluations, is required in order to support the development of the Risk Analysis Study, the Risk Management Program and the Emergency Plan. This article aims to provide an overview of probabilistic risk assessment methodologies and their applications in nuclear and environmental licensing processes of nuclear reactors in Brazil. (author)

  4. Application of probabilistic risk assessment in nuclear and environmental licensing processes of nuclear reactors in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Mata, Jonatas F.C. da; Vasconcelos, Vanderley de; Mesquita, Amir Z., E-mail: jonatasfmata@yahoo.com.br, E-mail: vasconv@cdtn.br, E-mail: amir@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2015-07-01

    The nuclear accident at Fukushima Daiichi, occurred in Japan in 2011, brought reflections, worldwide, on the management of nuclear and environmental licensing processes of existing nuclear reactors. One of the key lessons learned in this matter, is that the studies of Probabilistic Safety Assessment and Severe Accidents are becoming essential, even in the early stage of a nuclear development project. In Brazil, Brazilian Nuclear Energy Commission, CNEN, conducts the nuclear licensing. The organism responsible for the environmental licensing is Brazilian Institute of Environment and Renewable Natural Resources, IBAMA. In the scope of the licensing processes of these two institutions, the safety analysis is essentially deterministic, complemented by probabilistic studies. The Probabilistic Safety Assessment (PSA) is the study performed to evaluate the behavior of the nuclear reactor in a sequence of events that may lead to the melting of its core. It includes both probability and consequence estimation of these events, which are called Severe Accidents, allowing to obtain the risk assessment of the plant. Thus, the possible shortcomings in the design of systems are identified, providing basis for safety assessment and improving safety. During the environmental licensing, a Quantitative Risk Analysis (QRA), including probabilistic evaluations, is required in order to support the development of the Risk Analysis Study, the Risk Management Program and the Emergency Plan. This article aims to provide an overview of probabilistic risk assessment methodologies and their applications in nuclear and environmental licensing processes of nuclear reactors in Brazil. (author)

  5. U.S. licensing process and ABWR certification

    International Nuclear Information System (INIS)

    Quirk, J.F.; Williams, W.A.

    1996-01-01

    Part 50 of Title 10 of the Code of Federal Regulation (CFR) establishes a two-step licensing process by which the U.S. Nuclear Regulatory Committee (NRC) authorizes nuclear reactor plant construction through issuance of a construction permit and authorizes operation by issuance of an operating license. At each stage, the NRC Staff conducts technical reviews and there is potential for public hearings. In 1989, the NRC issued a new, simplified licensing process: Part 52. The purpose of the Part 52 licensing process is to provide a regulatory framework that brings about earlier resolution of licensing issues. Because issues are not resolved early in the Part 50 licensing process, approval of an operating license is not assured until after a significant investment has been made in the plant. Part 52 increases the stability and certainty of the licensing process by providing for the early resolution of safety and environmental issues. The Part 52 licensing process features (1) early site permits, (2) design certification, and (3) combined construction permit and operating licenses. As part of the U.S. Advanced Light Water Reactor (ALWR) Program to revitalize the nuclear option through the integration of government/utility/industry efforts, GE undertook the role of applying for certification for its latest product line, the Advanced Boiling Water Reactor (ABWR), under the U.S. ABWR certification program. The ABWR design is an essentially complete plant. Initial application for design certification was in 1987 under Part 50. GE reapplied in late 1991 under the newly promulgated Part 52. Following seven years of intensive interactions with the NRC and ACRS, GE was awarded the first Final Design Approval (FDA) under Part 52. The Commission initiated rulemaking by publishing the proposed ABWR Certification Rule in the Federal Register in early 1995. Certification is anticipated mid-1996. (J.P.N.)

  6. 77 FR 51551 - Proposed Renewal of Information Collection: Alternatives Process in Hydropower Licensing

    Science.gov (United States)

    2012-08-24

    ...: Alternatives Process in Hydropower Licensing AGENCY: Office of the Secretary, Office of Environmental Policy... approval for the collection of information for Alternatives Process in Hydropower Licensing. This... comments should reference Alternatives Process in Hydropower Licensing. FOR FURTHER INFORMATION CONTACT: To...

  7. Licensing process for future applications of advanced-design nuclear reactors

    International Nuclear Information System (INIS)

    Miller, C.L.

    1990-01-01

    The existing 10CFR50 two-step licensing process in the Code of Federal Regulations can continue to be a viable licensing vehicle for future applications, at least for the near future. The US Nuclear Regulatory Commission (NRC) Commissioners and staff, the public, and the utilities (along with supporting architect/engineers and nuclear steam supply system vendors) have a vast body of experience and knowledge of the existing part 50 licensing process. All these participants are familiar with their respective roles in this process, and history shows this process to be a workable licensing vehicle. Nevertheless, the use of 10CFR52 should be encouraged for future applications. This proposed new rule is intended to achieve the early resolution of licensing issues, to reduce the complexity and uncertainty of the licensing process, and enhance the safety and reliability of nuclear power plants. Part 52's overall purpose is to improve reactor safety and streamline the licensing process by encouraging the use of standard reactor designs and by allowing the early resolution of site environmental and reactor safety issues. The public should be afforded an earlier entry into the licensing process as a result of design certification rulemaking process and combined construction permit/operating license hearings

  8. 77 FR 30308 - Proposed Renewal of Information Collection: Alternatives Process in Hydropower Licensing

    Science.gov (United States)

    2012-05-22

    ...: Alternatives Process in Hydropower Licensing AGENCY: Office of the Secretary, Office of Environmental Policy... the Alternatives Process in Hydropower Licensing, OMB Control Number 1094-0001. FOR FURTHER... more of the Departments develop for inclusion in a hydropower license issued by the Federal Energy...

  9. License renewal process

    International Nuclear Information System (INIS)

    Fable, D.; Prah, M.; Vrankic, K.; Lebegner, J.

    2004-01-01

    The purpose of this paper is to provide information about license renewal process, as defined by Nuclear Regulatory Commission (NRC). The Atomic Energy Act and NRC regulations limit commercial power reactor licenses to an initial 40 years but also permit such licenses to be renewed. This original 40-year term for reactor licenses was based on economic and antitrust considerations not on limitations of nuclear technology. Due to this selected time period; however, some structures and components may have been engineered on the basis of an expected 40-year service life. The NRC has established a timely license renewal process and clear requirements codified in 10 CFR Part 51 and 10 CFR Part 54, that are needed to assure safe plant operation for extended plant life. The timely renewal of licenses for an additional 20 years, where appropriate to renew them, may be important to ensuring an adequate energy supply during the first half of the 21st Century. License renewal rests on the determination that currently operating plants continue to maintain adequate levels of safety, and over the plant's life, this level has been enhanced through maintenance of the licensing bases, with appropriate adjustments to address new information from industry operating experience. Additionally, NRC activities have provided ongoing assurance that the licensing bases will continue to provide an acceptable level of safety. This paper provides additional discussion of license renewal costs, as one of key elements in evaluation of license renewal justifiability. Including structure of costs, approximately value and two different approaches, conservative and typical. Current status and position of Nuclear Power Plant Krsko, related to license renewal process, will be briefly presented in this paper. NPP Krsko is designed based on NRC Regulations, so requirements from 10 CFR 51, and 10 CFR 54, are applicable to NPP Krsko, as well. Finally, this paper will give an overview of current status of

  10. 10 CFR 51.80 - Draft environmental impact statement-materials license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...

  11. Licensing process in Finland

    International Nuclear Information System (INIS)

    Tiippana, Petteri

    2011-01-01

    In accordance with the Nuclear Energy Act, the use of nuclear energy constitutes operations subject to license. The licensing process and conditions for granting a license is defined in the legislation. The licenses are applied from and granted by the Government. This paper discusses briefly the licensing process in Finland and also the roles and responsibilities of main stakeholders in licensing. Licensing of a nuclear power plant in Finland has three steps. The first step is the Decision in Principle (DiP). Goal of DiP is to decide whether using nuclear power is for the overall good for the Finnish society. The second step is Construction License (CL) and the goal of CL phase is to determine whether the design of the proposed plant is safe and that the participating organisations are capable of constructing the plant to meet safety goals. The third step is the Operating License (OL) and the goal of the OL phase is to determine whether the plant operates safely and licensee is capable to operate the plant safely. Main stakeholders in the licensing process in Finland are the utility (licensee) interested in using nuclear power in Finland, Ministry of Employment and the Economy (MEE), Government, Parliament, STUK, the municipality siting the plant and the general public. Government grants all licenses, and Parliament has to ratify Government's Decision in Principle. STUK has to assess the safety of the license applications in each step and give statement to the Ministry. Municipality has to agree to site the plant. Both STUK and the municipality have a veto right in the licensing process

  12. [Environmental licensing of major undertakings: possible connection between health and environment].

    Science.gov (United States)

    Silveira, Missifany; Araújo Neto, Mário Diniz de

    2014-09-01

    The prospect of multidisciplinary assessment that considers the environmental impacts on the health of the population during the implementation of potentially polluting projects is incipient in Brazil. Considering the scenario of major undertakings in the country, broadening the outlook on the health and environment relationship based on social and economic development processes striving for environmentally sustainable projects is a key strategy. This article examines the debate on the relationship between the current development model, the risks, the environment and health and discusses the importance of the participation of the health sector in the environmental licensing procedures, which is the instrument of the Environmental Impact Assessment (EIA). Seeking to create more environmentally and socially sustainable territories, the health sector has been looking for opportunities to participate in the licensing processes of major undertakings from the EIA standpoint. Results of research conducted by the Ministry of Health have demonstrated the form of participation in these processes, highlighting the strengths and weaknesses that favor or hinder the increase of preventive actions in public health in the implementation of major undertakings in Brazil.

  13. Environmental licensing issues for cogeneration plants

    International Nuclear Information System (INIS)

    Lipka, G.S.; Bibbo, R.V.

    1990-01-01

    The siting and licensing of cogeneration and independent power production (IPP) facilities is a complex process involving a number of interrelated engineering, economic, and environmental impact considerations. Important considerations for the siting and licensing of such facilities include air quality control and air quality impacts, water supply and wastewater disposal, and applicable noise criteria and noise impact considerations. Air quality control and air quality impact considerations for power generation facilities are commonly reviewed in the public forum, and most project developers are generally aware of the key air quality licensing issues. These issues include Best Available Control Technology (BACT) demonstration requirements, and air quality modeling requirements. BACT is a case-by-case determination, which causes uncertainty, in that developers have difficulty in projecting the cost of required control systems. Continuing developments in control technology may cause this problem to continue in the 1990's. Air quality modeling can be a problem in hilly terrain or within or near an urban environment, which could delay or preclude permitting of a new cogeneration or IPP facility in such locations. This paper discusses several environmental issues which are less frequently addressed than air quality issues, namely water/wastewater and noise. The design features of typical cogeneration and IPP facilities that affect water supply requirements, wastewater volumes, and noise emissions are discussed. Then, the site selection and impact review process are examined to identify typical constraints and trade-offs that can develop relative to water, wastewater, and noise issues. Trends in permit review requirements for water, wastewater, and noise are examined. Finally, innovative approaches that can be used to resolve potential development constraints for water, wastewater, and noise issues are discussed

  14. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-Materials Licenses § 51.97 Final environmental impact statement—materials license. (a) Independent spent fuel storage installation (ISFSI...

  15. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  16. CEQ regulations called peril to nuclear licensing process

    International Nuclear Information System (INIS)

    O'Neill, J.V.

    1979-01-01

    Court challenges are expected over regulations of the Council on Environmental Quality (CEQ) that were designed to improve nuclear-licensing decisions, but that have actually changed the meanings of National Environmental Policy Act (NEPA) regulations. The legal implications of these changes could, unless resolved, make the licensing process for nuclear facilities even more uncertain. Agency comments are thought to be critical, although the CEQ has declined to release them, and some question the Council's legality. The Nuclear Regulatory Commission faults the CEQ regulations for revising existing law, being inconsistent with the responsibilities of an independent regulatory body, and extending the CEQ's authority beyond the role assigned by NEPA and the President's Executive Order

  17. Reactor licensing process: a status report

    International Nuclear Information System (INIS)

    Long, J.A.

    1977-01-01

    The Nuclear Regulatory Commission (NRC), in its review of applications for licenses to construct and operate nuclear power plants, is required to consider those measures necessary to ensure the protection of the health and safety of the public and the environment. The article discusses the NRC staff procedures and policies for conducting the detailed safety, environmental, and antitrust reviews that provide the basis for these assurances. Included is a discussion of the improvements to the licensing process currently being proposed or implemented to enhance its stability and predictability for the benefit of all involved with the regulation of nuclear power. The views and opinions expressed in the article are those of the author alone and do not represent positions of the NRC

  18. Public debates - key issue in the environmental licensing process for the completion of the Cernavoda NPP Unit 2

    International Nuclear Information System (INIS)

    Rotaru, Ioan; Jelev, Adrian

    2003-01-01

    SN 'NUCLEARELECTRICA' S.A., the owner of Cernavoda NPP, organized, in 2001, several public consultations related to environmental impact of the completion of the Cernavoda NPP Unit 2, as required by the Romanian environmental law, part of project approval. Public consultations on the environmental assessment for the completion of the Cernavoda NPP - Unit 2 took place in 2001 between August 15 and September 21 in accordance with the provisions of Law No. 137/95 and Order No. 125/96. Romanian environmental legislation, harmonization of national environmental legislation with European Union, Romanian legislative requirements, information distributed to the public, issues raised and follow-up, they all are topics highlighted by this paper and they are addressing the environmental licensing process of the Cernavoda 2 NPP. The public consultation process described fulfils all the Romanian requirements for carrying out meaningful consultation with its relevant shareholders. The process also satisfies EDC (Export Development Corporation - Canada) requirements for public consultation and disclosure with relevant shareholders in the host country. SNN is fully committed to consulting as necessary with relevant shareholders throughout the construction and operation of the Project. Concerns of the public have been taken into account with the operations of Unit 1 and will continue to be addressed during the Unit 2 Project

  19. Siting Practices and Site Licensing Process for New Reactors in Canada

    International Nuclear Information System (INIS)

    Vos, Marcel de

    2011-01-01

    'Siting' in Canada is composed of Site Evaluation and Site Selection. As outlined in CNSC Regulatory Document RD-346 Site Evaluation for New Nuclear Power Plants (based on IAEA NS-R-3), prior to the triggering of the Environmental Assessment (EA) and licensing processes, the proponent is expected to use a robust process to characterize proposed sites over the full life cycle of the facility, and then develop a fully documented defense of the site selection case. This case forms the backbone for submissions in support of the EA and the application for a License to Prepare Site which will be reviewed by the CNSC and other applicable federal authorities. The Environmental Assessment process and License to Prepare Site in Canada do not require a proponent to select a specific design; however, CNSC does not accept a 'black box' approach to siting. CNSC balances the level of design information required with the extent of safety assurance desired for any designs being contemplated for the proposed site. Nevertheless, the design information submitted must be sufficient to justify the site as suitable for all future licensing stages. The depth of plant design information contributes significantly to the credibility of the applicant's case for both the EA and application for License to Prepare Site. The review process utilizes an assessment plan with defined review stages and timelines. The outcome of these reviews is a series of recommendations to a federal government appointed Joint Review Panel (which also serves as a panel of the 'Commission') which, following public hearings, renders a decision regarding the EA, and subsequently, the application for a License to Prepare Site. (author)

  20. Environmental impact studies of projects be licensed under the Atomic Law

    International Nuclear Information System (INIS)

    Heuel-Fabianek, Burkhard; Lennartz, Reinhard

    2009-01-01

    The German Law on Environmental Impact Assessment (UVPG) defines projects to be licensed under the Atomic Law that require an environmental impact study (EIS). Since the project concepts as defined in the UVPG are often not the same as those defined in the Atomic Law (AtG), the licensing authority has to decide which project should be subjected to an EIA. Additionally, Article 37 of the EURATOM Treaty obliges every Member State to communicate certain data relating to the impact of emissions of radioactive substances to the Commission. This is independent of the EIA. A licence may only be granted by the competent authorities if an opinion has been received from the Commission pursuant to Article 37. In either case, the licensing authority is the first point of contact for the applicant if the question arises of whether a project has to be subjected to an EIA. A ''voluntary'' EIA should be regarded with caution because of the complexity of such a procedure within the licensing process requiring considerable resources of time and manpower, and the danger of a loss of credibility of the EIA. (orig.)

  1. Improving the effectiveness of impact assessment pertaining to Indigenous peoples in the Brazilian environmental licensing procedure

    International Nuclear Information System (INIS)

    Hanna, Philippe; Vanclay, Frank; Langdon, Esther Jean; Arts, Jos

    2014-01-01

    The number of environmental licence applications for projects affecting Indigenous peoples in Brazil has increased since the implementation of a major infrastructure program (Programa de Aceleração do Crescimento) in 2007. This increase has caused problems for Brazilian agencies involved in environmental licensing procedures (IBAMA, FUNAI and others). We analyze the Brazilian environmental licensing procedure for situations involving Indigenous peoples, Maroons (Quilombolas) or other traditional communities in order to identify potential improvements for Brazil and potentially other countries. Although Brazilian procedures are consistent with international best practice in environmental licensing, in practice social impacts are inadequately addressed, mitigation measures are poorly implemented, and there is a lack of enforcement and compliance. The paper is based on document analysis and interviews with key actors in governmental and non-governmental organizations and Indigenous leaders. We suggest that Free, Prior and Informed Consent (FPIC) processes need to be conducted at the earliest stages of project planning, and that Indigenous peoples should actively participate in impact assessment, monitoring and evaluation processes. In order to achieve a social licence to operate, there needs to be full recognition of traditional knowledge and acceptance of Indigenous values and concepts. We also recommend increased involvement of social experts and mediators as well as improved accountability, enforcement and grievance mechanisms in the licensing process. - Highlights: • The Brazilian environmental licensing system needs to address social impacts better. • Communities need to be consulted at the earliest stage possible. • Indigenous peoples need to be invited to participate in impact assessment teams. • Independent Indigenous committees to monitor implementation of mitigation measures. • Accountability, enforcement and grievance mechanisms need to be

  2. Improving the effectiveness of impact assessment pertaining to Indigenous peoples in the Brazilian environmental licensing procedure

    Energy Technology Data Exchange (ETDEWEB)

    Hanna, Philippe [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, PO Box 800, 9700 AV Groningen (Netherlands); Vanclay, Frank, E-mail: frank.vanclay@rug.nl [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, PO Box 800, 9700 AV Groningen (Netherlands); Langdon, Esther Jean [Department of Anthropology, Center for Philosophy and Human Sciences, Federal University of Santa Catarina PO Box 5104, 88040-970, Florianópolis, SC (Brazil); Arts, Jos [Department of Planning, Faculty of Spatial Sciences, University of Groningen, PO Box 800, 9700 AV Groningen (Netherlands)

    2014-04-01

    The number of environmental licence applications for projects affecting Indigenous peoples in Brazil has increased since the implementation of a major infrastructure program (Programa de Aceleração do Crescimento) in 2007. This increase has caused problems for Brazilian agencies involved in environmental licensing procedures (IBAMA, FUNAI and others). We analyze the Brazilian environmental licensing procedure for situations involving Indigenous peoples, Maroons (Quilombolas) or other traditional communities in order to identify potential improvements for Brazil and potentially other countries. Although Brazilian procedures are consistent with international best practice in environmental licensing, in practice social impacts are inadequately addressed, mitigation measures are poorly implemented, and there is a lack of enforcement and compliance. The paper is based on document analysis and interviews with key actors in governmental and non-governmental organizations and Indigenous leaders. We suggest that Free, Prior and Informed Consent (FPIC) processes need to be conducted at the earliest stages of project planning, and that Indigenous peoples should actively participate in impact assessment, monitoring and evaluation processes. In order to achieve a social licence to operate, there needs to be full recognition of traditional knowledge and acceptance of Indigenous values and concepts. We also recommend increased involvement of social experts and mediators as well as improved accountability, enforcement and grievance mechanisms in the licensing process. - Highlights: • The Brazilian environmental licensing system needs to address social impacts better. • Communities need to be consulted at the earliest stage possible. • Indigenous peoples need to be invited to participate in impact assessment teams. • Independent Indigenous committees to monitor implementation of mitigation measures. • Accountability, enforcement and grievance mechanisms need to be

  3. Environmental Standard Review Plan for the review of a license application for a low-level radioactive waste disposal facility: Environmental report

    International Nuclear Information System (INIS)

    1987-04-01

    The Environmental Standard Review Plan (ESRP) (NUREG-1300) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform environmental reviews of environmental reports prepared by applicants in support of license applications to construct and operate new low-level radioactive waste disposal facilities. The individual ESRPs that constitute this document identify the information considered necessary to conduct the review, the purpose and scope of the review, the analysis procedure and evaluation, the formal input to the environmental statement, and the references considered appropriate for each review. The ESRP is intended to ensure quality and uniformity of approach in individual reviews as well as compliance with the National Environmental Policy Act of 1969. In addition, the ESRP will make information about the environmental component of the licensing process more readily available and thereby will serve to improve the understanding of this process among the public, States and regional compacts, and the regulated community

  4. License renewal

    International Nuclear Information System (INIS)

    Newberry, S.

    1993-01-01

    This article gives an overview of the process of license renewal for nuclear power plants. It explains what is meant by license renewal, the significance of license renewal, and goes over key elements involved in the process of license renewal. Those key elements are NRC requirements embodied in 10 CFR Part 54 (Reactor Safety) and 10 CFR Part 51 (Environmental Issues). In addition Industry Reports must be developed and reviewed. License renewal is essentially the process of applying for a 20 year extension to the original 40 year operating license granted for the plant. This is a very long term process, which involves a lot of preparation, and compliance with regulatory rules and guidelines. In general it is a process which is expected to begin when plants reach an operating lifetime of 20 years. It has provisions for allowing the public to become involved in the review process

  5. Generic environmental impact statement for license renewal of nuclear plants

    International Nuclear Information System (INIS)

    1996-05-01

    Volume 2 of the Generic Environmental Impact Statement for License Renewal of Nuclear Plants contains the appendices. These include: (A) General characterisitics and environmental settings of domestic nuclear plants, (B) Definition of impact initiators, (C) Socioeconomics and case studies, (D) Aquatic organisms and human health, (E) Radiation protection considerations, (F) Methodology for assessing impacts to aquatic ecology and water resources, (G) Postulated accidents, and (H) Environmental statutes and regulations affecting license renewal

  6. Streamlining the license renewal review process

    International Nuclear Information System (INIS)

    Dozier, J.; Lee, S.; Kuo, P.T.

    2001-01-01

    The staff of the NRC has been developing three regulatory guidance documents for license renewal: the Generic Aging Lessons Learned (GALL) report, Standard Review Plan for License Renewal (SRP-LR), and Regulatory Guide (RG) for Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses. These documents are designed to streamline the license renewal review process by providing clear guidance for license renewal applicants and the NRC staff in preparing and reviewing license renewal applications. The GALL report systematically catalogs aging effects on structures and components; identifies the relevant existing plant programs; and evaluates the existing programs against the attributes considered necessary for an aging management program to be acceptable for license renewal. The GALL report also provides guidance for the augmentation of existing plant programs for license renewal. The revised SRP-LR allows an applicant to reference the GALL report to preclude further NRC staff evaluation if the plant's existing programs meet the criteria described in the GALL report. During the review process, the NRC staff will focus primarily on existing programs that should be augmented or new programs developed specifically for license renewal. The Regulatory Guide is expected to endorse the Nuclear Energy Institute (NEI) guideline, NEI 95-10, Revision 2, entitled 'Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule', which provides guidance for preparing a license renewal application. This paper will provide an introduction to the GALL report, SRP-LR, Regulatory Guide, and NEI 95-10 to show how these documents are interrelated and how they will be used to streamline the license renewal review process. This topic will be of interest to domestic power utilities considering license renewal and international ICONE participants seeking state-of-the-art information about license renewal in the United States

  7. The licensing processes influence on nuclear market

    International Nuclear Information System (INIS)

    Locatelli, Giorgio; Mancini, Mauro; Sainati, Tristano; Sallinen, Liisa

    2011-01-01

    The paper deals with the licensing nuclear power plants; it focuses primarily on the licensing process implications into the international nuclear market. Nowadays there are twenty-six countries that are planning to build new nuclear facilities, and thirty-seven where nuclear reactors are proposed; on the other hand, there are mainly ten international reactor vendors. At international level, there are few vendors that have sufficient resources, capabilities and experience to carry out the design and delivering of a nuclear power plant in the international market; On the other hand, the licensing processes are strictly dependent on national law frameworks, and on the nuclear policies. The paper proposes a comparison of six licensing processes (the ones established in Finland, France, Italy, South Korea, USA and UK), and analyzes its main features and implications; the IAEA licensing process is taken as reference point. The objective of the paper is to propose a systemic approach for considering the licensing procedures. The framework proposed enables facilitating the licensing management and inferring the main features of licensing contexts. The paper concludes with a forecast of the nuclear licensing context, especially with respect to the fourth generation of nuclear reactors. (author)

  8. Federal/State cooperation in the licensing of a nuclear power project. A joint licensing process between the US Nuclear Regulatory Commission and the Washington State Energy Facility Site Evaluation Council

    International Nuclear Information System (INIS)

    1984-05-01

    This report summarizes and documents a joint environmental review and licensing process established between the US Nuclear Regulatory Commission (NRC) and the Washington State Energy Facility Site Evaluation Council (EFSEC) in 1980-1983 for the Skagit/Hanford Nuclear Project (S/HNP). It documents the agreements made between the agencies to prepare a joint environmental impact statement responsive to the requirements of the National Environmental Policy Act of 1969 (NEPA) and the Washington State Environmental Policy Act. These agreements also established protocol to conduct joint public evidentiary hearings on matters of mutual jurisdiction, thereby reducing the duplication of effort and increasing the efficiency of the use of resources of federal and state governments and other entities involved in the process. This report may provide guidance and rationale to licensing bodies that may wish to adopt some of the procedures discussed in the report in the event that they become involved in the licensing of a nuclear power plant project. The history of the S/HNP and of the agreement processes are discussed. Discussions are provided on implementing the joint review process. A separate section is included which presents independent evaluations of the process by the applicant, NRC, and EFSEC

  9. The USNCR license renewal process

    International Nuclear Information System (INIS)

    Kuo, Pao-Tsin

    2002-01-01

    The US Congress promulgated a law in 1954, entitled 'Atomic Energy Act'. This Act states that operating licenses for commercial nuclear power plants are limited to a fixed term of 40 years, but they may be renewed for a period not to exceed 20 years. The terms were established mainly for economic considerations, not based on technical limitations. The U.S. Nuclear Regulatory Commission (USNRC) published the license renewal rule, Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), in December, 1991. The rule has since been amended in May, 1995. The underlying principle of the rule is that the regulatory process is adequate for ensuring safety of operating plants. The regulatory process includes NRC's issuance of Orders, Bulletins, Generic Letters, and Information Notices, as well as a number of special inspections in addition to the continuous oversight and routine inspection activities performed by on-site inspectors. Because of this comprehensive regulatory process, compilation of the current license basis or re-verification of the current licensing basis is not considered necessary for a license renewal review. The USNRC also determined on the basis of the findings of its research programs that active structures and components are well maintained by the existing programs. Therefore, the focus of the license renewal review is on passive, long-lived structures and components and on time-limited ageing analyses. The time-limited ageing analyses are for those structures and components which were originally designed to a 40 year service life

  10. Development model to public hearing for environmental licensing of nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Vasques, Luciana Gomes; Aquino, Afonso Rodrigues de, E-mail: lu_vasques@usp.br, E-mail: araquino@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    The use of nuclear technology has always been a matter of concern from an environmental point of view. Although disputed, the generation of electricity in nuclear reactors was considered a source of clean emission in relation to emission of gases responsible for the greenhouse effect. In Brazil, nuclear activities are regulated and supervised by the Brazilian Commission of Nuclear Energy - CNEN. Environmental issues associated with nuclear activities are described by CONAMA, and the developments in this area are licensed by IBAMA, regardless of obtaining nuclear licenses issued by CNEN. Obtaining environmental licenses (prior, installation and operation) depends initially on preparing the Environmental Impact Study - EIS and the Environmental Impact Report - EIR, consisting of a presentation of EIS in language accessible to all. EIR is forwarded to bodies and entities with some connection to the enterprise, to be manifested with IBAMA about the relevance of its content. This information serves as a resource for Public Hearings, which are meetings organized by entrepreneurs, conducted by IBAMA, and rely on public participation, can be considered as a licensing step. Public Hearings are subject to subjectivity, and the model proposed in this research becomes more objective ill-defined, difficult to understand actions for the entrepreneur. (author)

  11. Development model to public hearing for environmental licensing of nuclear facilities

    International Nuclear Information System (INIS)

    Vasques, Luciana Gomes; Aquino, Afonso Rodrigues de

    2015-01-01

    The use of nuclear technology has always been a matter of concern from an environmental point of view. Although disputed, the generation of electricity in nuclear reactors was considered a source of clean emission in relation to emission of gases responsible for the greenhouse effect. In Brazil, nuclear activities are regulated and supervised by the Brazilian Commission of Nuclear Energy - CNEN. Environmental issues associated with nuclear activities are described by CONAMA, and the developments in this area are licensed by IBAMA, regardless of obtaining nuclear licenses issued by CNEN. Obtaining environmental licenses (prior, installation and operation) depends initially on preparing the Environmental Impact Study - EIS and the Environmental Impact Report - EIR, consisting of a presentation of EIS in language accessible to all. EIR is forwarded to bodies and entities with some connection to the enterprise, to be manifested with IBAMA about the relevance of its content. This information serves as a resource for Public Hearings, which are meetings organized by entrepreneurs, conducted by IBAMA, and rely on public participation, can be considered as a licensing step. Public Hearings are subject to subjectivity, and the model proposed in this research becomes more objective ill-defined, difficult to understand actions for the entrepreneur. (author)

  12. Overview of the Yucca Mountain Licensing Process

    International Nuclear Information System (INIS)

    M. Wisenburg

    2004-01-01

    This paper presents an overview of the licensing process for a Yucca Mountain repository for high-level radioactive waste and spent nuclear fuel. The paper discusses the steps in the licensing proceeding, the roles of the participants, the licensing and hearing requirements contained in the Code of Federal Regulations. A description of the Nuclear Regulatory Commission (NRC) staff acceptance and compliance reviews of the Department of Energy (DOE) application for a construction authorization and a license to receive and possess high-level radioactive waste and spent nuclear fuel is provided. The paper also includes a detailed description of the hearing process

  13. Generic environmental impact statement for license renewal of nuclear plants. Final report

    International Nuclear Information System (INIS)

    1996-05-01

    This GEIS examines the possible environmental impacts that could occur as a result of renewing the licenses of individual nuclear power plants under 10 CFR 54. To the extent possible, it establishes the bounds and significance of these potential impacts. The analysis encompasses all operating light-water reactors. For each type of environmental impact, the GEIS attempts to establish generic findings covering as many plants as possible. While plant and site-specific information is used in developing the generic findings, the NRC does not intend for the GEIS to be a compilation of individual plant environmental impacts statements. This document has three principal objectives: (1) to provide an understanding of the types and severity of environmental impacts that may occur as a result of license renewal, (2) to identify and assess those impacts that are expected to be generic to license renewal, and (3) to support rulemaking (10 CFR 51) to define the number and scope of issues that need to be addressed by the applicants in plant-by-plant license renewal proceedings

  14. Review process for license renewal applications

    International Nuclear Information System (INIS)

    Craig, John W.; Kuo, P.T.

    1991-01-01

    In preparation for license renewal reviews, the Nuclear Regulatory Commission has recently published for public review and comment a proposed rule for license renewal and a draft Standard Review Plan as well as a draft Regulatory Guide relating to the implementation of the proposed rule. In support of future license renewal applications, the nuclear industry has also submitted 11 industry reports for NRC review and approval. This paper briefly describe how these parallel regulatory and industry activities will be factored into the NRC review process for license renewal. (author)

  15. Risk and environmental impact assessment: nuclear and environmental licensing interface

    International Nuclear Information System (INIS)

    Costa, Eduardo M.; Monteiro, Iara A.

    1997-01-01

    The main aims of this paper are the identification and discussion of interfaces and application of common concepts in the existing nuclear and environmental licensing procedures. Risk and impact assessment of nuclear electricity generation are two of these concepts which are discussed detail. The risk concept, which had initially focused on engineering projects, has been extended to many other areas of human activity. Risk resulting from the use of ionization radiation has been associated to the dose for the critical members of the public. Therefore, radiation protection applies basic dose limits which are established in national and international recommendations. These recommendations are increasing the emphasis to keep all the exposures to ionizing radiation as low as reasonable achievable, economical and social factors being taken into account. On the other hand, environmental impact assessment has been used as a tool in planning and decision-making processes, thus including environmental concern in the discussion of social and economical development strategies. This paper aims to discuss the association of these two concepts by presenting the procedures of control of radiological impact during normal operation of a nuclear power plant and the various forms of risk communication to the public in the case of events occurrence. (author). 13 refs

  16. NUPLEX Licensing Subcommittee

    International Nuclear Information System (INIS)

    Edwards, D.W.; Allen, S.R.

    1988-01-01

    The NUPLEX Licensing Subcommittee was organized to seek a formal license renewal mechanism that institutionalizes the current licensing basis and consequent level of safety of a plant as the legitimate standard for acceptance and approval of an application for extended operation. Along with defining the most workable approach to and scope of review for license renewal, this paper explains the reasons why a regulatory framework is needed by the early 1990s. The initial results of development work on two key issues, licensing criteria and hearing process, are also presented. at this point six potential license renewal criteria have emerged: evaluation of existing monitoring/maintenance programs, revalidation of current licensing basis, conformance to special regulations, evaluation to a safety goal, plant performance history, and environmental assessment. The work on a hearing process has led to the development of two models for future consideration: hybrid legislative and hybrid adjudicatory

  17. Environmental Standard Review Plan for the review of license renewal applications for nuclear power plants

    International Nuclear Information System (INIS)

    O'Brien, J.; Kim, T.J.; Reynolds, S.

    1991-08-01

    The Environmental Standard Review Plan for the Review of License Applications for Nuclear Power Plants (ESRP-LR) is to be used by the NRC staff when performing environmental reviews of applications for the renewal of power reactor licenses. The use of the ESRP-LR provides a framework for the staff to determine whether or not environmental issues important to license renewal have been identified and the impacts evaluated and provides acceptance standards to help the reviewers comply with the National Environmental Policy Act

  18. Evaluation of the environmental licensing process for small hydroelectric power plants in Minas Gerais state, Brazil; Avaliacao do processo de licenciamento ambiental para pequenas centrais hidreletricas no estado de Minas Gerais

    Energy Technology Data Exchange (ETDEWEB)

    Pedreira, Adriana Coli

    2004-07-01

    The present situation of the environmental licensing process have been slow and complicated, in relation to the current conception of the sustainable environmental development in the country. The enterprises and impacting activities are being discussed and analysed through a great number of environmental laws and specific laws to each enterprise. These laws along with the inexperience of the enterprises and of the many institutions involved in the process are an obstacle to the development. This document presents the legal and institutional aspects of the environmental licensing for the implementation of small hydroelectric power plants. Laws and doctrine related to the topic were researched and concluded for Minas Gerais State with the help of a survey with the enterprises and institutions involved in the process to find out the difficulties that influence the delay of the analysis of the SHPP. The results show that the main barriers are the non-application of the CONAMA resolution 279/2001 to the SHPP, undetermined inspection criteria, excess of environmental programs, technical incapacity, lack of financial resources, non-integration of the institutional organs, the building of SHPP in permanent preservation area, project interfering in the fish fauna, studies an environmental impact with then reports and public audiences. Finally, concludes that the difficulties are based on the non-integration of the institutions and also, being recent, on the inexperience of the actors involved. Therefore, the study suggests on increase of the technical body in the institutions and training of their analysts; hiring of specialized consultancy, implantation of an environmental integrated system, social communication program in the planning phase, fulfillment of the CONAMA resolution 279/2001; integration of public ministry representatives in the licensing organs; application of planning and zoning, deadlines and legal imposition of these deadlines in order to supply the

  19. Integration of MGDS design into the licensing process

    International Nuclear Information System (INIS)

    1997-12-01

    This paper presents an overview of how the Mined Geologic Disposal System (MGDS) design for a potential repository is integrated into the licensing process. The integration process employs a two-told approach: (1) ensure that the MGDS design complies with applicable Nuclear Regulatory Commission (NRC) licensing requirements, and (2) ensure that the MGDS design is appropriately reflected in a license application that is acceptable to the NRC for performing acceptance and compliance reviews

  20. Research and development tasks of the basalt waste isolation program, and their relationship to the licensing process

    International Nuclear Information System (INIS)

    Kunkel, W.P.

    1978-06-01

    This document presents a preliminary licensing program and outlines the research and development strategy by which a license will be obtained for the repository. It addresses the base data covering the major areas of investigation and technology which will provide input to the licensing process. Basically, each facet of the program, as described in the plan, will be used as part of the documentation required for the Preliminary and Final Safety Analysis Report (PSAR and FSAR), as well as the Environmental Report

  1. 78 FR 37324 - Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications

    Science.gov (United States)

    2013-06-20

    ... Environmental Reports for Nuclear Power Plant License Renewal Applications AGENCY: Nuclear Regulatory Commission... for Nuclear Power Plant License Renewal Applications.'' This regulatory guide provides guidance to... renewal of a nuclear power plant operating license. Applicants should use this regulatory guide when...

  2. Managing the high level waste nuclear regulatory commission licensing process

    International Nuclear Information System (INIS)

    Baskin, K.P.

    1992-01-01

    This paper reports that the process for obtaining Nuclear Regulatory Commission permits for the high level waste storage facility is basically the same process commercial nuclear power plants followed to obtain construction permits and operating licenses for their facilities. Therefore, the experience from licensing commercial reactors can be applied to the high level waste facility. Proper management of the licensing process will be the key to the successful project. The management of the licensing process was categorized into four areas as follows: responsibility, organization, communication and documentation. Drawing on experience from nuclear power plant licensing and basic management principles, the management requirement for successfully accomplishing the project goals are discussed

  3. Nuclear law and environmental law in the licensing of nuclear installations

    International Nuclear Information System (INIS)

    Raetzke, Christian

    2013-01-01

    Large nuclear installations can have a considerable impact on the environment, both in actual terms, due to the construction and operation of the plant and in potential terms, related to the risk of an accident. A considerable part of the multiple authorisation processes required to develop a large nuclear project is devoted to addressing the possible impact on the environment. Accordingly, environmental protection is not only warranted by requirements and processes arising out of what is generally considered 'environmental law', but also by laws governing the design, siting, construction and operation of nuclear installations. By ensuring prevention and control of radiation releases to the environment, the aspects of nuclear law governing the design, construction, operation and decommissioning of nuclear facilities pertain to the field of environmental protection just like other fields of environmental law. The perception of the public that nuclear energy is 'anti-environmental' and the generally antinuclear stance of environmental non-governmental organisations (NGOs) should not deflect attention from the fact that protection of the environment is one of the main functions of the body of nuclear law. In this article, the general relationship between the law governing civil nuclear installations and environmental law will be analysed. The subsequent chapters will deal with environmental requirements and procedures as part of the authorisation process for a nuclear installation. The role of public participation and the involvement of neighbouring states in the licensing process will also be investigated, as they are today mainly based on environmental law. Some other aspects which may also have some relation to environmental protection, such as waste management, emergency planning, multinational early notification and assistance in the case of an accident and nuclear liability, have been omitted from discussion as they lie outside the focus of this article

  4. 78 FR 37281 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses

    Science.gov (United States)

    2013-06-20

    ... factors: (1) License renewal will involve nuclear power plants for which the environmental impacts of...) Changes in the environment around nuclear power plants are gradual and predictable. The 1996 GEIS improved... environmental impacts that may occur from renewing commercial nuclear power plant operating licenses; (2...

  5. Licensing process for safety-critical software-based systems

    Energy Technology Data Exchange (ETDEWEB)

    Haapanen, P. [VTT Automation, Espoo (Finland); Korhonen, J. [VTT Electronics, Espoo (Finland); Pulkkinen, U. [VTT Automation, Espoo (Finland)

    2000-12-01

    System vendors nowadays propose software-based technology even for the most critical safety functions in nuclear power plants. Due to the nature of software faults and the way they cause system failures new methods are needed for the safety and reliability evaluation of these systems. In the research project 'Programmable automation systems in nuclear power plants (OHA)', financed together by the Radiation and Nuclear Safety Authority (STUK), the Ministry of Trade and Industry (KTM) and the Technical Research Centre of Finland (VTT), various safety assessment methods and tools for software based systems are developed and evaluated. As a part of the OHA-work a reference model for the licensing process for software-based safety automation systems is defined. The licensing process is defined as the set of interrelated activities whose purpose is to produce and assess evidence concerning the safety and reliability of the system/application to be licensed and to make the decision about the granting the construction and operation permissions based on this evidence. The parties of the licensing process are the authority, the licensee (the utility company), system vendors and their subcontractors and possible external independent assessors. The responsibility about the production of the evidence in first place lies at the licensee who in most cases rests heavily on the vendor expertise. The evaluation and gauging of the evidence is carried out by the authority (possibly using external experts), who also can acquire additional evidence by using their own (independent) methods and tools. Central issue in the licensing process is to combine the quality evidence about the system development process with the information acquired through tests, analyses and operational experience. The purpose of the licensing process described in this report is to act as a reference model both for the authority and the licensee when planning the licensing of individual applications

  6. Licensing process for safety-critical software-based systems

    International Nuclear Information System (INIS)

    Haapanen, P.; Korhonen, J.; Pulkkinen, U.

    2000-12-01

    System vendors nowadays propose software-based technology even for the most critical safety functions in nuclear power plants. Due to the nature of software faults and the way they cause system failures new methods are needed for the safety and reliability evaluation of these systems. In the research project 'Programmable automation systems in nuclear power plants (OHA)', financed together by the Radiation and Nuclear Safety Authority (STUK), the Ministry of Trade and Industry (KTM) and the Technical Research Centre of Finland (VTT), various safety assessment methods and tools for software based systems are developed and evaluated. As a part of the OHA-work a reference model for the licensing process for software-based safety automation systems is defined. The licensing process is defined as the set of interrelated activities whose purpose is to produce and assess evidence concerning the safety and reliability of the system/application to be licensed and to make the decision about the granting the construction and operation permissions based on this evidence. The parties of the licensing process are the authority, the licensee (the utility company), system vendors and their subcontractors and possible external independent assessors. The responsibility about the production of the evidence in first place lies at the licensee who in most cases rests heavily on the vendor expertise. The evaluation and gauging of the evidence is carried out by the authority (possibly using external experts), who also can acquire additional evidence by using their own (independent) methods and tools. Central issue in the licensing process is to combine the quality evidence about the system development process with the information acquired through tests, analyses and operational experience. The purpose of the licensing process described in this report is to act as a reference model both for the authority and the licensee when planning the licensing of individual applications. Many of the

  7. Methodology and findings of the NRC's materials licensing process redesign

    International Nuclear Information System (INIS)

    Rathbun, P.A.; Brown, K.D.; Madera, J.R.; Moriarty, M.; Pelchat, J.M.; Usilton, W.K.; Whitten, J.E.; Vacca, P.C.

    1996-04-01

    This report describes the work and vision of the team chartered to redesign the process for licensing users of nuclear materials. The Business Process Redesign team was chartered to improve the speed of the existing licensing process while maintaining or improving public safety and to achieve required resource levels. The report describes the team's methods for acquiring and analyzing information about the existing materials licensing process and the steps necessary to radically change this process to the envisioned future process

  8. Environmental assessment for final rule on nuclear power plant license renewal

    International Nuclear Information System (INIS)

    1991-12-01

    The Atomic Energy Act and Nuclear Regulatory Commission (NRC) regulations provide for the renewal of nuclear power plant operating licenses beyond their initial 40-year term. The Act and NRC regulations, however, do not specify the procedures, criteria, and standards that must be satisfied in order to renew a license. The NRC is promulgating a rule (10 CFR Part 54) to codify such requirements prior to the receipt of applications for license renewal. The NRC has assessed the possible environmental effects of promulgating requirements in 10 CFR Part 54 now rather than employing such requirements in an ad hoc manner in individual licensing actions. The final part 54 rule requires the development of information and analyses to identify aging problems of systems, structures, and components unique to license renewal that will be of concern during the period of extended operation and will not be controlled by existing effective programs. In general, licensee activities for license renewal may involve replacement, refurbishment, inspection, testing, or monitoring. Such actions will be generally be within the range of similar actions taken for plants during the initial operating term. These actions would be primarily confined within the plants with potential for only minor disruption to the environment. It is unlikely that these actions would change the operating conditions of plants in ways that would change the environmental effects already being experienced. Relicensing under existing regulations would also be primarily focused on aging degradation and would likely result in requirements similar to those that will result from relicensing under the final rule

  9. Regulations and the licensing process in Austria

    International Nuclear Information System (INIS)

    Matulla, Herbert U.

    1979-01-01

    A review of the licensing process which took place from 1971 to 1978 shows which laws, regulations and standards were used in checking the safety aspects of the nuclear power plant and which organisations participated in the licensing process. The internal organisation of the Austrian main-expert in the procedure is illustrated. Examples of detail-work are explained. The importance of intensive co-operation of the different technical groups and the problems of comparable examination depth are underlined. (author)

  10. Licensing Process for International Projects

    International Nuclear Information System (INIS)

    Raetzke, Christan

    2014-01-01

    Christan Raetzke, lawyer, then outlined why nuclear constructions were always international projects and in which cases it would make sense to also make the licensing process be international. His law consulting firm CONLAR focuses specifically on design review so he could adequately present why an international process would make a lot of sense without being a loss of sovereignty

  11. Environmental policy on the fixed-fee licensing of eco-technology under foreign penetration

    OpenAIRE

    Kim, Seung-Leul; Lee, Sang-Ho

    2016-01-01

    This study investigates environmental policy on the fixed-fee licensing strategy of clean eco-technology by an innovator having foreign ownership. We show that near-zero emission taxes accompanied by non-exclusive licensing regulation can improve social welfare when the cost gap is small or foreign penetration is high. However, when foreign ownership is not high, exclusive licensing regulations with an appropriate emission tax policy may improve social welfare.

  12. Environmental license process complexity in natural protected areas: case of OSBAT pipeline operated by TRANSPETRO in the state of Sao Paulo; Complexidade do licenciamento ambiental em areas naturais protegidas: caso do duto OSBAT operado pela TRANSPETRO no estado de Sao Paulo

    Energy Technology Data Exchange (ETDEWEB)

    Alves, Anibal Jose Constantino; Raul, Vanderlei Lourenco; Martini, Andrea Dietrich; Campos, Cleber Lucio dos Santos; Ozorio, Tarcisio Faria; Melo Neto, Joao Evangelista de; Lima, Silvia Ferreira de [PETROBRAS Transporte S. A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    It presents the environmental license process enforced to obtain the Implementation License (LI) of the OSBAT pipeway part substitution, in the Sao Sebastiao city, State of Sao Paulo, with the analyses centered on the several public power instances and on the many special legal protection aspects around the natural area scenarios of the project interference. The license process had the duration of seventeen months, since the LI protocol and its emission. The process had the involvement of several organisms, the main part from the Sistema Nacional de Meio Ambiente - SISNAMA, and represented an interesting experience that can contribute to the agility of other license process of infrastructure works on protected natural areas, which has the incidence of an extensive legislation and activities restriction. (author)

  13. 78 FR 46255 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction

    Science.gov (United States)

    2013-07-31

    ... Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction AGENCY: Nuclear... nuclear power plant. Compliance with the provisions of the rule is required by June 20, 2014. This... environmental effect of renewing the operating license of a nuclear power plant. This document is necessary to...

  14. The importance of multidisciplinary action for the environmental licensing process in the PETROBRAS/UN-RIO (Unidade de Negocio de Exploracao e Producao do Rio de Janeiro); A importancia da acao multidisciplinar em processos de licenciamento ambiental na Unidade de Negocio de Exploracao e Producao do Rio de Janeiro - UN-RIO, da PETROBRAS

    Energy Technology Data Exchange (ETDEWEB)

    Rodrigues, Aline W.L.; Vidal, Roseane D.M.; Rocha, Valmir G. da [PETROBRAS, Rio de Janeiro, RJ (Brazil). Unidade de Negocio de Exploracao e Producao

    2004-07-01

    This paper describes the workings of the so-called Environmental Licensing Group from PETROBRAS's UN-RIO's SMS division (Safety, Health and the Environment Division). It emphasizes the importance of multidisciplinary action in the environmental licensing process of activities related to the transference and production of oil and gas, especially in a company the size and importance like PETROBRAS. The effectiveness of the system adopted by UN-RIO is verified by the results already achieved by the group, with the successful licensing of its activities. For a company like PETROBRAS, with a great number of activities simultaneously being licensed, it is extremely important that there exists a control, not only of the information that is being sent to the Environmental Agency as a follow-up of the several licensing processes, so that Licenses can be obtained in time and without complications. (author)

  15. Licensing process characteristics of Small Modular Reactors and spent nuclear fuel repository

    Energy Technology Data Exchange (ETDEWEB)

    Söderholm, Kristiina, E-mail: kristiina.soderholm@fortum.com [Fortum Power (Finland); Tuunanen, Jari, E-mail: jari.tuunanen@fortum.com [Fortum Power (Finland); Amaba, Ben, E-mail: baamaba@us.ibm.com [IBM Complex Systems (United States); Bergqvist, Sofia, E-mail: sofia.bergqvist@se.ibm.com [IBM Rational Software (Sweden); Lusardi, Paul, E-mail: plusardi@nuscalepower.com [NuScale Power (United States)

    2014-09-15

    Highlights: • We examine the licensing process challenges of modular nuclear facilities. • We compare the features of Small Modular Reactors and spent nuclear fuel repository. • We present the need of nuclear licensing simplification. • Part of the licensing is proposed to be internationally applicable. • Systems engineering and requirements engineering benefits are presented. - Abstract: This paper aims to increase the understanding of the licensing processes characteristics of Small Modular Reactors (SMR) compared with licensing of spent nuclear fuel repository. The basis of the SMR licensing process development lies in licensing processes used in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their various licensing processes and recent actions in the new NPP construction. Certain aspects of the aviation industry licensing process have also been studied and selected practices have been investigated as possibly suitable for use in nuclear licensing. Suitable features for SMR licensing are emphasized and suggested. The licensing features of the spent nuclear fuel deep repository along with similar features of SMR licensing are discussed. Since there are similar types of challenges of lengthy licensing time frames, as well as modular features to be taken into account in licensing, these two different nuclear industry fields can be compared. The main SMR features to take into account in licensing are: • Standardization of the design. • Modularity. • Mass production. • Serial construction. Modularity can be divided into two different categories: the first category is simply a single power plant unit constructed of independently engineered modules (e.g. construction process for Westinghouse AP-1000 NPP) and the second one a power plant composed of many reactor modules, which are manufactured in factories and installed as needed (e.g. NuScale Power SMR design). The deep underground repository

  16. Shirley Basin Uranium Mill. Environmental report to accompany source material license application

    International Nuclear Information System (INIS)

    1975-12-01

    This document summarizes all of the environmental monitoring conducted by Utah. This Environmental Report consequently supplements and updates the information presented in the Source Material License application of August 18, 1970 and the Final Environmental Statement (FES) of December 1974. Water and air quality, liquid waste management, soil/vegetation monitoring, and reclamation are covered

  17. NRC licensing requirements: DOD options

    International Nuclear Information System (INIS)

    Pike, W.J.; O'Reilly, P.D.

    1982-09-01

    This report describes the licensing process (both safety and environmental) that would apply if the Department of Defense (DOD) chooses to obtain licenses from the US Nuclear Regulatory Commission (NRC) for using nuclear energy for power and luminous sources. The specific nuclear energy sources being considered include: small or medium-size nuclear power reactors; radioisotopic thermoelectric generators with 90 Sr or 238 Pu; radioisotopic dynamic electric generators with 90 Sr or 238 Pu; and applications of radioisotopes for luminous sources (lights) with 3 H, 85 Kr, or 147 Pm. The steps of the licensing process are summarized in the following sections, with particular attention given to the schedule and level of effort necessary to support the process

  18. Methodology and findings of the NRC`s materials licensing process redesign

    Energy Technology Data Exchange (ETDEWEB)

    Rathbun, P.A.; Brown, K.D.; Madera, J.R.; Moriarty, M.; Pelchat, J.M.; Usilton, W.K.; Whitten, J.E.; Vacca, P.C.

    1996-04-01

    This report describes the work and vision of the team chartered to redesign the process for licensing users of nuclear materials. The Business Process Redesign team was chartered to improve the speed of the existing licensing process while maintaining or improving public safety and to achieve required resource levels. The report describes the team`s methods for acquiring and analyzing information about the existing materials licensing process and the steps necessary to radically change this process to the envisioned future process.

  19. The United States nuclear regulatory commission license renewal process

    International Nuclear Information System (INIS)

    Holian, B.E.

    2009-01-01

    The United States (U.S.) Nuclear Regulatory Commission (NRC) license renewal process establishes the technical and administrative requirements for the renewal of operating power plant licenses. Reactor ope-rating licenses were originally issued for 40 years and are allowed to be renewed. The review process for license renewal applications (L.R.A.) provides continued assurance that the level of safety provided by an applicant's current licensing basis is maintained for the period of extended operation. The license renewal review focuses on passive, long-lived structures and components of the plant that are subject to the effects of aging. The applicant must demonstrate that programs are in place to manage those aging effects. The review also verifies that analyses based on the current operating term have been evaluated and shown to be valid for the period of extended operation. The NRC has renewed the licenses for 52 reactors at 30 plant sites. Each applicant requested, and was granted, an extension of 20 years. Applications to renew the licenses of 20 additional reactors at 13 plant sites are under review. As license renewal is voluntary, the decision to seek license renewal and the timing of the application is made by the licensee. However, the NRC expects that, over time, essentially all U.S. operating reactors will request license renewal. In 2009, the U.S. has 4 plants that enter their 41. year of ope-ration. The U.S. Nuclear Industry has expressed interest in 'life beyond 60', that is, requesting approval of a second renewal period. U.S. regulations allow for subsequent license renewals. The NRC is working with the U.S. Department of Energy (DOE) on research related to light water reactor sustainability. (author)

  20. The importance of multidisciplinary action for the environmental licensing process in the PETROBRAS/UN-RIO (Unidade de Negocio de Exploracao e Producao do Rio de Janeiro); A importancia da acao multidisciplinar em processos de licenciamento ambiental na Unidade de Negocio de Exploracao e Producao do Rio de Janeiro - UN-RIO, da PETROBRAS

    Energy Technology Data Exchange (ETDEWEB)

    Rodrigues, Aline W.L.; Vidal, Roseane D.M.; Rocha, Valmir G. da [PETROBRAS, Rio de Janeiro, RJ (Brazil). Unidade de Negocio de Exploracao e Producao

    2004-07-01

    This paper describes the workings of the so-called Environmental Licensing Group from PETROBRAS's UN-RIO's SMS division (Safety, Health and the Environment Division). It emphasizes the importance of multidisciplinary action in the environmental licensing process of activities related to the transference and production of oil and gas, especially in a company the size and importance like PETROBRAS. The effectiveness of the system adopted by UN-RIO is verified by the results already achieved by the group, with the successful licensing of its activities. For a company like PETROBRAS, with a great number of activities simultaneously being licensed, it is extremely important that there exists a control, not only of the information that is being sent to the Environmental Agency as a follow-up of the several licensing processes, so that Licenses can be obtained in time and without complications. (author)

  1. NRC's license renewal regulations

    International Nuclear Information System (INIS)

    Akstulewicz, Francis

    1991-01-01

    In order to provide for the continuity of the current generation of nuclear power plant operating licenses and at the same time ensure the health and safety of the public, and the quality of the environment, the US Nuclear Regulatory Commission (NRC) established a goal of developing and issuing regulations and regulatory guidance for license renewal in the early 1990s. This paper will discuss some of those activities underway to achieve this goal. More specifically, this paper will discuss the Commission's regulatory philosophy for license renewal and the two major license renewal rule makings currently underway. The first is the development of a new Part 54 to address procedural and technical requirements for license renewal; the second is a revision to existing Part 51 to exclude environmental issues and impacts from consideration during the license renewal process. (author)

  2. Licensing aspects regarding the RBMN project

    International Nuclear Information System (INIS)

    Cuccia, Valeria; Sacramento, Arivaldo M.; Aleixo, Bruna L.; Ferreira, Vinicius V.M.

    2013-01-01

    The licensing process of a waste disposal facility is a complex and demanding undertaking. It proceeds in phases, starting with the site selection and ending many decades later, when the radionuclides decayed and no longer offer possible hazard. That is one of the reasons why the licensing process for the Brazilian repository for low and intermediate level radioactive waste (RBMN Project) is a challenge for all the technicians involved. Besides that, the only national experience associated to this subject arose after a radiological accident in the State of Goias, in 1987. Two different institutions are involved in this licensing process: IBAMA, for environmental licensing, and CNEN, for nuclear licensing. Both of them will evaluate the possible impacts caused by the waste disposal, so it is essential to avoid conflicts and duplications of activities. The RBMN project has different teams for each main activity, and one of them is the Licensing group. This team has been planning the licensing activities for the repository, studying the legal framework and estimating costs and execution time for each step. This paper presents the status of the licensing activities regarding to the RBMN project done by the CNEN staff. (author)

  3. Key processes and input parameters for environmental tritium models

    International Nuclear Information System (INIS)

    Bunnenberg, C.; Taschner, M.; Ogram, G.L.

    1994-01-01

    The primary objective of the work reported here is to define key processes and input parameters for mathematical models of environmental tritium behaviour adequate for use in safety analysis and licensing of fusion devices like NET and associated tritium handling facilities. (author). 45 refs., 3 figs

  4. Key processes and input parameters for environmental tritium models

    Energy Technology Data Exchange (ETDEWEB)

    Bunnenberg, C; Taschner, M [Niedersaechsisches Inst. fuer Radiooekologie, Hannover (Germany); Ogram, G L [Ontario Hydro, Toronto, ON (Canada)

    1994-12-31

    The primary objective of the work reported here is to define key processes and input parameters for mathematical models of environmental tritium behaviour adequate for use in safety analysis and licensing of fusion devices like NET and associated tritium handling facilities. (author). 45 refs., 3 figs.

  5. Environmental Licensing: an Instrument of Command and Control by Exception?

    OpenAIRE

    Sleman Chams, Juliette; Gestión Ambiental de la Corporación Autónoma Regional del Atlántico-CRA, autoridad ambiental del Departamento del Atlántico,; Velásquez Muñoz, Carlos Javier; Universidad del Norte (Barranquilla)

    2016-01-01

    This article analyzes the situation of the most important instrument of command and control existing in the Colombian environmental legislation: the environmental license. Since its first formal regulation, on behalf of Decree 1753 of August 3, 1994, has received several modifications which, apparently, have made, in spite of its importance, in an instrument of command and control by exception. The article revises on the scope of each of the modifications and the justifications put forward by...

  6. 10 CFR 51.62 - Environmental report-land disposal of radioactive waste licensed under 10 CFR part 61.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-land disposal of radioactive waste....62 Environmental report—land disposal of radioactive waste licensed under 10 CFR part 61. (a) Each applicant for issuance of a license for land disposal of radioactive waste pursuant to part 61 of this...

  7. Compliance with NRC subsystem requirements in the repository licensing process

    International Nuclear Information System (INIS)

    Minwalla, H.

    1994-01-01

    Section 121 of the Nuclear Waste Policy Act of 1982 requires the Nuclear Regulatory Commission (Commission) to issue technical requirements and criteria, for the use of a system of multiple barriers in the design of the repository, that are not inconsistent with any comparable standard promulgated by the Environmental Protection Agency (EPA). The Administrator of the EPA is required to promulgate generally applicable standards for protection of the general environment from offsite releases from radioactive material in repositories. The Commission's regulations pertaining to geologic repositories are provided in 10 CFR part 60. The Commission has provided in 10 CFR 60.112 the overall post-closure system performance objective which is used to demonstrate compliance with the EPA high-level waste (HLW) disposal standard. In addition, the Commission has provided, in 10 CFR 60.113, subsystem performance requirements for substantially complete containment, fractional release rate, and groundwater travel time; however, none of these subsystem performance requirements have a causal technical nexus with the EPA HLW disposal standard. This paper examines the issue of compliance with the conflicting dual regulatory role of subsystem performance requirements in the repository licensing process and recommends several approaches that would appropriately define the role of subsystem performance requirements in the repository licensing process

  8. Regulatory guidance for license renewal

    International Nuclear Information System (INIS)

    Thoma, John A.

    1991-01-01

    The proposed 10 CFR Part 54 rule proceduralizes the process for license renewal by identifying both the administrative and technical requirements for a renewal application. To amplify and support this regulation, written guidance has been provided in the form of a draft Regulatory Guide (DG 1009) and a draft Standard Review Plan for License Renewal (NUREG 1299). This guidance is scheduled to be finalized in 1992. Similar guidance will be provided for the proposed revisions to 10 CFR Part 51 concerning the environmental aspects of license renewal. (author)

  9. Use of social communication as a tool for environmental licensing of small-scale hydroelectric power plants; Uso da comunicacao social como instrumento para o licenciamento ambiental de PCH - pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Tiago Filho, Geraldo Lucio [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Inst. de Recursos Naturais], e-mail: tiago@unifei.edu.br; Galhardo, Camila Rocha [Centro Nacional de Referencia em Pequenas Centrais Hidreletricas (CERPCH), MG (Brazil)], e-mail: pchnoticias@unifei.edu.br

    2006-07-01

    The present work intends to study the process of environmental licensing of the Small ones Central Hydroelectric (PCHs) through the rising of the legal framework of the referred process and to analyze the application of tools of social communication in the mitigation of the social impacts in the zone of influence of the enterprise. Through the analysis of the critical points in the environmental licensing of small hydroelectric uses and evaluation of communication actions taking in consideration the environmental costs for the enterprise. (author)

  10. Fuel licensing process for an industrial use. ATF licensing process for an industrial use - Utility's perspective

    International Nuclear Information System (INIS)

    Waeckel, Nicolas

    2013-01-01

    To develop and license a breakthrough nuclear fuel technology for commercial use is becoming challenging. All the former safety analysis design limits (SAFDLs) defined in the 1970's for the standard UO 2 -Zr fuels, might no longer be applicable. Identification of the appropriate safety analysis design limits For each type of innovative fuel, the developers will have to identify and investigate all the possible failure/ruins scenarios (not only those related to severe accidents but also those related to normal operation). In order to save time and to focus on the best options, those failure scenarios (which could be 'killers' for the ATF concept) have to be determined early enough in the development process. Based on the above failure scenarios, the developers will have to propose the licensing limits (and the experimental protocol to determine and to justify them). As mentioned earlier, the licensing limits should not be defined against the accidental conditions only. For the operators, the (good) in-reactor fuel behaviour is crucial. As an example, in the case of the new fuel concepts coming with an outer coating, it is important to include the analysis of the consequences of the loss of this protective outer layer in the licensing process due to a manufacturing defect or an inevitable in-reactor fretting wear. Obviously, the new/specific SAFDLs will have to be endorsed by the regulators (which could be a long process by itself). Identification of a commercial reactor to irradiate the first ATF A commercial NPP is not a material test reactor (MTR); irradiating lead test fuel rods (LTFRs) or lead test assemblies (LTAs) implies strict requirements regarding the manufacturing processes [which should not include chemicals (additives or solvents) potentially incompatible with the nuclear technical specifications], the compatibility with the hosting fuel core (in terms of geometry, enrichment, thermal hydraulic performances, etc.) and the robustness and

  11. New nuclear plant design and licensing process

    International Nuclear Information System (INIS)

    Luangdilok, W.

    1996-01-01

    This paper describes latest developments in the nuclear power reactor technology with emphasis on three areas: (1) the US technology of advanced passive light water reactors (AP600 and S BWR), (2) regulatory processes that certify their safety, and (3) current engineering concerns. The goal is to provide and insight of how the government's regulatory agency guarantees public safety by looking into how new passive safety features were designed and tested by vendors and how they were re-evaluated and retested by the US NRC. The paper then discusses the US 1989 nuclear licensing reform (10 CFR Part 52) whose objectives are to promote the standardization of nuclear power plants and provide for the early and definitive resolution of site and design issues before plants are built. The new licensing process avoids the unpredictability nd escalated construction cost under the old licensing process. Finally, the paper summarizes engineering concerns found in current light water reactors that may not go away in the new design. The concerns are related the material and water chemistry technology in dealing with corrosion problems in water-cooled nuclear reactor systems (PWRs and BWRs). These engineering concerns include core shroud cracking (BWRs), jet pump hold-down beam cracking (BWRs), steam generator tube stress corrosion cracking (PWR)

  12. Environmental Impact Appraisal for renewal of special nuclear material license No. SNM-42 (Docket No. 70-27)

    International Nuclear Information System (INIS)

    1984-03-01

    The Babcock and Wilcox Company (B and W) Naval Nuclear Fuel Division (NNFD) facility near Lynchburg, Virginia, produces fuel assemblies and complete fuel modules for reactors used in the US Navy nuclear propulsion program and fuel components for university and other research reactors; and processes scrap material to recover the enriched uranium content. No significant modifications of the production procedures for the US Navy nuclear fuel fabrication have been made since the previous environmental assessment, and none are anticipated during the five-year license renewal period being considered. In 1982 the fabrication of fuel assemblies for university and other research reactors was begun. This environmental assessment provides a review of the past five years of operation and an analysis of future impacts, including the effect of plant changes. The proposed action is the renewal of the license necessary for B and W to continue the existing fuel fabrication operations. Principal operations in the fabrication facility include the processing of highly enriched uranium (> 90% 235 U) into fuel elements and assembling the elements into complete reactor cores for shipment and eventual installation in US Navy facilities. The principal environmental impacts of current operation of the NNFD result from release of radioactive gases to the atmosphere and of radioactively contaminated liquids to the adjacent James River. The actual gaseous and liquid pollutants released during normal operation of the plant have been monitored and documented. The principal subjects addressed in this environmental assessment include water use, pollutant controls, environmental monitoring, and environmental impact of operation and accidents. Other site factors and plant operations necessary for this assessment are described, and aspects of insignificant impacts are identified. 10 figures, 36 tables

  13. Considerations about the licensing process of special nuclear industrial facilities

    Energy Technology Data Exchange (ETDEWEB)

    Talarico, M.A., E-mail: talaricomarco@hotmail.com [Marinha do Brasil, Rio de Janeiro, RJ (Brazil). Coordenacao do Porgrama de Submarino com Propulsao Nuclear; Melo, P.F. Frutuoso e [Coordenacao dos Programas de Pos-Graduacao em Engenharia (COPPE/UFRJ), Rio de Janeiro, RJ (Brazil). Programa de Engenharia Nuclear

    2015-07-01

    This paper brings a discussion about the challenges involved in the development of a new kind of nuclear facility in Brazil, a naval base for nuclear submarines, with attention to the licensing process and considerations about the risk-informed decision making application to the licensing process. Initially, a model of such a naval base, called in this work, special industrial facility, is proposed, with its systems and respective sets of basic requirements, in order to make it possible the accomplishment of the special industrial facility support function to the nuclear submarine. A discussion about current challenges to overcome in this project is presented: the challenges due to the new characteristics of this type of nuclear facility; existence of several interfaces between the special industrial facilities systems and nuclear submarine systems in design activities; lack of specific regulation in Brazil to allow the licensing process of special industrial facilities by the nuclear safety authority; and comments about the lack of information from reference nuclear facilities, as is the case with nuclear power reactors (for example, the German Grafenrheinfeld nuclear plant is the reference plant for the Brazilian Angra 2 nuclear plant). Finally, in view of these challenges, an analysis method of special industrial facility operational scenarios to assist the licensing process is proposed. Also, considerations about the application of risk-informed decision making to the special industrial facility activity and licensing process in Brazil are presented. (author)

  14. Considerations about the licensing process of special nuclear industrial facilities

    International Nuclear Information System (INIS)

    Talarico, M.A.; Melo, P.F. Frutuoso e

    2015-01-01

    This paper brings a discussion about the challenges involved in the development of a new kind of nuclear facility in Brazil, a naval base for nuclear submarines, with attention to the licensing process and considerations about the risk-informed decision making application to the licensing process. Initially, a model of such a naval base, called in this work, special industrial facility, is proposed, with its systems and respective sets of basic requirements, in order to make it possible the accomplishment of the special industrial facility support function to the nuclear submarine. A discussion about current challenges to overcome in this project is presented: the challenges due to the new characteristics of this type of nuclear facility; existence of several interfaces between the special industrial facilities systems and nuclear submarine systems in design activities; lack of specific regulation in Brazil to allow the licensing process of special industrial facilities by the nuclear safety authority; and comments about the lack of information from reference nuclear facilities, as is the case with nuclear power reactors (for example, the German Grafenrheinfeld nuclear plant is the reference plant for the Brazilian Angra 2 nuclear plant). Finally, in view of these challenges, an analysis method of special industrial facility operational scenarios to assist the licensing process is proposed. Also, considerations about the application of risk-informed decision making to the special industrial facility activity and licensing process in Brazil are presented. (author)

  15. The environmental licensing processes of the offshore oil and natural gas exploration and production in the world and in Brazil: a comparative analysis considering the utilization of studies of the strategic environmental assessment; O processo de licenciamento ambiental das atividades de exploracao e producao de petroleo e gas natural offshore no mundo e no Brasil: uma analise comparativa considerando a utilizacao de estudos de avaliacao ambiental estrategica

    Energy Technology Data Exchange (ETDEWEB)

    Mariano, Jacqueline [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE). Programa de Planejamento Energetico

    2004-07-01

    This study presents an analyses of the environmental licensing processes of the offshore oil and gas exploration and production of the following countries: USA, UK, Norway, Australia and Canada, and makes a comparison with the Brazilian case. This study also emphasizes the use of the Strategical Environmental Assessments (SEA) before the bid procedures. The SEA studies aim to predict and to evaluate the environmental implications of the adoption of sectorial policies and programs and are very useful to the decision making processes. They permit the exclusion of environmental sensitive areas and contribute to the improvement of the environmental management of the regions where the activities will take place. The selected countries use SEA as an environmental management tool and their experience is analysed so as to provide suggestions for the improvement of the current Brazilian environmental licensing process. (author)

  16. 78 FR 37325 - License Renewal of Nuclear Power Plants; Generic Environmental Impact Statement and Standard...

    Science.gov (United States)

    2013-06-20

    ... Nuclear Power Plants; Generic Environmental Impact Statement and Standard Review Plans for Environmental... for Nuclear Power Plants, Supplement 1: Operating License Renewal'' (ESRP). The ESRP serves as a guide... published a final rule, ``Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating...

  17. PROCESS FOR LICENSE APPLICATION DEVELOPMENT FOR THE GEOLOGIC REPOSITORY

    International Nuclear Information System (INIS)

    DOUGLAS M. FRANKS AND NORMAN C. HENDERSON

    1997-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the U.S. Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, (section)60.21ff and (section)60.31ff. This paper discusses the process the Yucca Mountain Site Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the ''Technical Guidance Document for Preparation of the License Application'' (TGD), currently in development

  18. Process for license application development for the geologic repository

    International Nuclear Information System (INIS)

    Franks, D.M.; Henderson, N.C.

    1998-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the US Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, section 60.21ff and section 60.31ff. This paper discusses the process the Yucca Mountain Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the Technical Guidance Document for Preparation of the License Application (TGD), currently in development

  19. Reactors licensing: proposal of an integrated quality and environment regulatory structure for nuclear research reactors in Brazil

    International Nuclear Information System (INIS)

    Serra, Reynaldo Cavalcanti

    2014-01-01

    A new integrated regulatory structure based on quality and integrated issues has been proposed to be implemented on the licensing process of nuclear research reactors in Brazil. The study starts with a literature review about the licensing process in several countries, all of them members of the International Atomic Energy Agency. After this phase it is performed a comparative study with the Brazilian licensing process to identify good practices (positive aspects), the gaps on it and to propose an approach of an integrated quality and environmental management system, in order to contribute with a new licensing process scheme in Brazil. The literature review considered the following research nuclear reactors: Jules-Horowitz and OSIRIS (France), Hanaro (Korea), Maples 1 and 2 (Canada), OPAL (Australia), Pallas (Holand), ETRR-2 (Egypt) and IEA-R1 (Brazil). The current nuclear research reactors licensing process in Brazil is conducted by two regulatory bodies: the Brazilian National Nuclear Energy Commission (CNEN) and the Brazilian Institute of Environment and Renewable Natural Resources (IBAMA). CNEN is responsible by nuclear issues, while IBAMA by environmental one. To support the study it was applied a questionnaire and interviews based on the current regulatory structure to four nuclear research reactors in Brazil. Nowadays, the nuclear research reactor’s licensing process, in Brazil, has six phases and the environmental licensing process has three phases. A correlation study among these phases leads to a proposal of a new quality and environmental integrated licensing structure with four harmonized phases, hence reducing potential delays in this process. (author)

  20. Environmental assessment proposed license renewal of Nuclear Metals, Inc. Concord, Massachusetts

    International Nuclear Information System (INIS)

    Miller, R.L.; Easterly, C.E.; Lombardi, C.E.; Treitler, I.E.; Winbow, R.T.; Zimmerman, G.P.

    1997-02-01

    The US Nuclear Regulatory Commission (NRC) has prepared this Environmental Assessment (EA) to evaluate environmental issues associated with the renewal of licenses issued by NRC for facilities operated by Nuclear Metals, Inc. (NMI) in Concord, Massachusetts. By renewing the licenses, NRC proposes to allow the continuation of ongoing operations involving radioactive materials at NMI's facilities. This EA focuses on the potential impacts related to air emissions at NMI during normal (incident-free) operations and accidental releases. Findings indicate that there are only two areas of potential concern. First, modeling results for sulfur dioxide (SO 2 ) emissions from the boilers during normal operations indicate that the potential exists for exceeding the short-term National Ambient Air Quality Standards (NAAQS). NMI is prepared to undertake mitigative action to prevent potential exceedances of the short-term SO 2 NAAQS, and the Massachusetts Department of Environmental Protection is prepared to resolve the issue via a permit/approval change or through a Consent Order. Second, in the unlikely event of a severe fire, predicted sulfuric acid (H 2 SO 4 ) concentrations based on conservative (upper bound) modeling exceed the Emergency Response Planning Guideline (ERPG) levels. NMI has committed to NRC to give a briefing for local emergency response officials regarding the potential for an accidental H 2 SO 4 release

  1. Process evaluation of an environmental health risk audit and action plan intervention to reduce alcohol related violence in licensed premises

    Directory of Open Access Journals (Sweden)

    Annie Williams

    2016-05-01

    Full Text Available Abstract Background Alcohol-related violence is associated with licensed premise environments and their management. There is a lack of evidence for effective interventions to address these, and there are significant barriers to implementation. This study aims to understand how development and implementation processes can facilitate intervention reach, fidelity and receipt and therefore provides key process data necessary to interpret the results of the randomised controlled trial conducted in parallel. Methods A process evaluation, embedded within a randomised controlled trial. Intervention development and implementation were assessed via focus groups (n = 2 and semi-structured interviews (n = 22 with Environmental Health Practitioners (EHPs. Reach and fidelity were assessed via routinely collected intervention data, which was was collected from 276 licenced premises across Wales, UK. Case study semi-structured interviews with licensed premises proprietors (n = 30 explored intervention receipt. Results Intervention co-production with senior EHPs facilitated organisational adoption and implementation. Training events for EHPs played an important role in addressing wider organisational concerns regarding partnership working and the contextual integration of the intervention. EHPs delivered the intervention to 98 % of intervention premises; 35 % of premises should have received a follow up enforcement visit, however EHP confidence in dealing with alcohol risk factors meant only 7 % of premises received one. Premises therefore received a similar intervention dose regardless of baseline risk. Intervention receipt appeared to be greatest in premises with an existing commitment to prevention and those in urban environments. Conclusions The study suggests that a collaborative approach to the development and diffusion of interventions is associated with high levels of organisational adoption, implementation and reach. However, the lack

  2. The need for review of environmental licensing rules taking into accounts innovations in the area of onshore seismic data acquisition; A necessidade de revisao das regras de licenciamento ambiental considerando inovacoes na area de aquisicao de dados sismicos terrestres

    Energy Technology Data Exchange (ETDEWEB)

    Vieira, Victor M. [Faculdade de Tecnologia e Ciencias - FTC, Salvador, BA (Brazil); Stilgoe, George [GeoDynamics Brasil Ltda., Rio de Janeiro, RJ (Brazil); Ferreira, Doneivan F. [Universidade Federal da Bahia (UFBA), Salvador, BA (Brazil). Dept. de Geologia e Geofisica Aplicada

    2008-07-01

    Activities involving seismic data acquisition aimed at the exploration, characterization, and monitoring of onshore oil and gas fields are expected to cause environmental impacts. Therefore, all seismic-related activities which require the use of traditional technologies must be licensed beforehand. The environmental licensing process is complex and subjected to interruptions and delays which will affect project schedule and cash flow. Some innovations in this field and other alternative techniques will allow data acquisition with reduced or insignificant environmental impacts. Within this context, the present paper proposes a description of the current onshore seismic acquisition techniques commonly used and their potential environmental impacts; presents and describes the innovative technique known as Infrasonic Passive Differential Spectroscopy (IPDS); and proposes a regulatory model which will allow a simplified licensing process. Additionally, this paper considers some positive impacts of regulatory flexibility, including: the possibility of using innovative techniques to fulfill obligations under the ANP Initial Work Program (PTI); time and cost reduction within the environmental licensing process; potential impacts on the recently-created market of oil production in fields with marginal accumulations. (author)

  3. Generic data sources for the update of an environmental report in support of license renewal

    International Nuclear Information System (INIS)

    Mauro, John J.

    1991-01-01

    Over the past 2 years, our organization has been providing assistance to the NUMARC PLEX working group in matters pertaining to the environmental impacts of license renewal. Part of this support was the identification of data sets and publications that may be useful to the NRC in the preparation of their Environment Report Supplements (ERSs). The following presents a strategy for preparing an ERS, along with references and data sets pertinent to each ER topic. Each section of the ERS should present the following information: (1) Updated information on plant design and operating experience, along with projections of the plant impacts through the end of its currently licensed period of operation. These impacts are used as a baseline against which to compare the projected impacts for the period of license renewal. In addition, the baseline impacts may be compared to the impacts projected in the plant's original Environmental Report and Environmental Impact Statement. (2) Projections of how the impacts may change during the period of license renewal. The purpose of this information will be to determine the degree to which the projected impacts differ significantly from the impacts presented in the original ER and those that have actually occurred during the period of plant operation. We believe that the ERS will reveal that (1) the actual impacts that have occurred during the period of plant operation are comparable to, or less than, those predicted in the original ER, (2) many impacts have been decreasing with time, such as routine radioactive emissions, and (3) the impacts predicted for the period of license renewal will be comparable to, or less than, the baseline impacts. (author)

  4. Licensing the California low-level radioactive waste disposal facility

    International Nuclear Information System (INIS)

    Dressen, A.L.; Serie, P.J.; Junkert, R.

    1992-01-01

    California has made significant progress toward the issuance of a license to construct and operate the Southwestern Compact's low-level radioactive waste disposal facility. However, obstacles to completing construction and preparing to receive waste still exist. This paper will describe the technical licensing issues, EIR/S process, political events, and public interactions that have impacted on California regulators' ability to complete the license application review and reach a decision on issuing a license. Issues associated with safely and liability evaluations, finalization of the environmental impact report, and land transfer processes involving multiple state, federal, and local agencies will be identified. Major issues upon which public and political opposition is focusing will also be described. (author)

  5. Interdisciplinary environmental impact statement examinations with parallel licensing procedures

    International Nuclear Information System (INIS)

    Gassner, E.

    1990-01-01

    The article investigates the question how the interdisciplinary, collective, integrative environmental impact statement can predominate the decisions in individual licensing procedures. It illustrates the requirements of the Act on Environmental Impact Statements. According to this Act, measures are to be found which deal with the overall complex, i.e. the entire system. In the article, the monitoring project organization's primary responsibility is emphasized: Analysis and prognosis of a project's environmental impacts are transferred to this organization for decision-preparation. Subsequent corrections or supplementations during the official approval procedure, or incorporation of the public through the authorities, do not change the matter. An all-comprehensive assessment must be based on all-comprehensive standards. From the point of view of immissions this is minimization of adverse effects on the nature cycle and landscape matters; from the point of view of emissions it is the duty of environment-compatible waste management within the sense of waste management legislation having to serve public welfare. (orig.) [de

  6. Geoprocessing semiautomated applied to licensing of nuclear facilities

    International Nuclear Information System (INIS)

    Oliveira, Aline Fabiane Gonçalves de

    2017-01-01

    In recent decades, Brazilian environmental legislation has undergone considerable evolution. This fact occurs concurrently with changes related to environmental studies, which aim increasingly to guarantee sustainability and environmental balance. Thus, it is important to use technological resources to optimize the environmental studies involved in the licensing processes. The present work sought to analyze and direct the application of geotechnologies (Geoprocessing) in environmental studies of the Local Report (RL) of the Center for the Development of Nuclear Technology (CDTN). The proposal to apply the Geoprocessing tools and the possibilities inherent to the Geographic Information Systems (GIS) technology, as a tool to subsidize the environmental studies in accordance with the requirements of the RL was aimed at contributing to the modernization of the stages involved in the process of Nuclear licensing, such as in the structuring and execution of environmental studies, as well as in the activities of environmental monitoring, always considering the precepts in force in the laws and resolutions and standards in force of the National Nuclear Energy Commission (CNEN) for nuclear licensing. In order to achieve the objective, the ArcGis application was adopted and one of its analytical tools Model Builder. This allowed the macro (schematization) of the methodology from the GIS tools applied, presenting as an advantage the efficiency and optimization of the execution time of the procedures in situations where it is necessary to apply the same routine of tasks, besides being editable, Which provides possibilities for adaptations and improvements. In order to achieve this objective, the applicability of the methodology was highly feasible, the model developed by Model Builder / ArcMap, provided a semi-automated process, and provided a flowchart that depicts the procedure to be performed in order to reach the Final process to make inferences and analyzes with greater

  7. Environmental assessment proposed license renewal of Nuclear Metals, Inc. Concord, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Miller, R.L.; Easterly, C.E.; Lombardi, C.E.; Treitler, I.E.; Winbow, R.T.; Zimmerman, G.P. [Oak Ridge National Lab., TN (United States)

    1997-02-01

    The US Nuclear Regulatory Commission (NRC) has prepared this Environmental Assessment (EA) to evaluate environmental issues associated with the renewal of licenses issued by NRC for facilities operated by Nuclear Metals, Inc. (NMI) in Concord, Massachusetts. By renewing the licenses, NRC proposes to allow the continuation of ongoing operations involving radioactive materials at NMI`s facilities. This EA focuses on the potential impacts related to air emissions at NMI during normal (incident-free) operations and accidental releases. Findings indicate that there are only two areas of potential concern. First, modeling results for sulfur dioxide (SO{sub 2}) emissions from the boilers during normal operations indicate that the potential exists for exceeding the short-term National Ambient Air Quality Standards (NAAQS). NMI is prepared to undertake mitigative action to prevent potential exceedances of the short-term SO{sub 2} NAAQS, and the Massachusetts Department of Environmental Protection is prepared to resolve the issue via a permit/approval change or through a Consent Order. Second, in the unlikely event of a severe fire, predicted sulfuric acid (H{sub 2}SO{sub 4}) concentrations based on conservative (upper bound) modeling exceed the Emergency Response Planning Guideline (ERPG) levels. NMI has committed to NRC to give a briefing for local emergency response officials regarding the potential for an accidental H{sub 2}SO{sub 4} release.

  8. Exploitation of BEPU Approach for the Licensing Process

    International Nuclear Information System (INIS)

    D'Auria, F.; Petruzzi, A.; Muellner, A.N.; Mazzantini, O.

    2011-01-01

    Within the licensing process of the Atucha II PHWR (Pressurized Heavy Water Reactor) the BEPU (Best Estimate Plus Uncertainty) approach has been selected for issuing of the Chapter 15 on FSAR (Final Safety Analysis Report). The key steps of the entire process are basically two: a) the selection of PIE (Postulated Initiating Events) and, b) the analysis by best estimate models supported by uncertainty evaluation. The key elements of the approach are: 1) availability of qualified computational tools including suitable uncertainty method; 2) demonstration of quality; 3) acceptability and endorsement by the licensing authority. The effort of issuing Chapter 15 is terminated at the time of issuing of the present paper and the safety margins available for the operation of the concerned NPP (Nuclear Power Plant) have been quantified. (authors)

  9. Licensing process for the power increase

    International Nuclear Information System (INIS)

    Perez P, R.; Mamani A, Y.R.; Salgado G, J.R.

    2006-01-01

    The licensing process for the power increase of a nuclear power station is presented, this includes the description of the effective normative framework, the attributions of the one Mexican regulator organism in nuclear matter, the definition and importance of the power level of a nuclear reactor for the safety studies. Also, the types of power increase according to its magnitude, and the regulator process that it includes the scope and the detail of the required information that it should be evaluated by the one regulator organism are discussed. Finally it offers a summary of the experience that one has in Mexico for this type of processes. (Author)

  10. 75 FR 8754 - Notice of Environmental Assessment Related to the Issuance of a License Amendment to Masters...

    Science.gov (United States)

    2010-02-25

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 030-34325; NRC-2010-0068] Notice of Environmental Assessment Related to the Issuance of a License Amendment to Masters Materials License 03-23853-01VA, for Unrestricted Release of a Department of Veterans Affairs Facility in Gainesville, FL AGENCY: Nuclear Regulatory Commission. ACTION: Issuance of...

  11. Environmental Assessment for renewal of Special Nuclear Material License No. SNM-368 (Docket No. 70-371)

    International Nuclear Information System (INIS)

    1985-01-01

    The proposed action is the renewal of the license necessary for UNC to continue the existing fuel fabrication operation. Principal operations in the fabrication facility include the processing of highly enriched uranium (>90% 235 U) into fuel elements and assembling of the elements into complete reactor cores. The present application for renewal involves no major changes in the current authorization and no new facilities are planned. The current operation of the UNC facilities results in the release of radioactive and nonradioactive effluent to the environment. The gaseous and liquid pollutants released during normal operation of the plant have been monitored and documented. The principal subjects addressed in this environmental assessment include water use, pollutant controls, environmental monitoring, and environmental impact of operation and accidents. Other site factors and plant operations necessary for this assessment are described, and aspects of insignificant impacts are identified. 7 figures, 23 tables

  12. Environmental licensing of nuclear facilities: compatibility of technical competencies

    International Nuclear Information System (INIS)

    Shu, J.; Paiva, R.L.C. de; Mezrahi, A.; Cardoso, E.M.; Aquino, W.P.; Deppe, A.L.; Menezes, R.M.; Prado, V.; Franco, N.M.F.L.; Nouailhetas, Y.; Xavier, A.M.

    1996-01-01

    The Brazilian Nuclear Energy Commission (CNEN) has the technical competency for diagnosing environmental radiological impacts, as well as evaluating the safety and requiring adequate control of the facilities which, due to their activities, represent a potential risk of radiological contamination for the environment. The institution is responsible for emission of radioprotection guidelines, controls and surveys in nuclear safety according to the country's regulations and international recommendations. The methodology to assure the limitation of radiation exposure is consequence from shared control over the nuclear activities, in special the nuclear facilities. According to the Federal Constitution of 1988, the nuclear activities must be under exclusive control of the Union in special related to the nuclear policies, economical, laboral and nuclear safety aspects, while the health and environmental controls of these activities are shared by the Federation, Union, States, Federal District and Counties. The controls related to specific aspects have to be harmonized in such a way to be optimized and effective. In this paper the results of compatibilization of nuclear legislation and environmental legislation are presented aiming to optimize the licensing of nuclear facilities. (author)

  13. Lessons learned from the licensing process for the Clinch River Breeder Reactor Plant

    International Nuclear Information System (INIS)

    Dickson, P.W.; Clare, G.H.

    1991-01-01

    This paper presents the experience of licensing a specific liquid-metal fast breeder reactor (LMFBR), the Clinch River Breader Reactor Plant (CRBRP). It was a success story in that the licensing process was accomplished in a very short time span. The actions of the applicant and the actions of the US Nuclear Regulatory Commission (NRC) in response are presented and discussed to provide guidance to future efforts to license unconventional reactors. The history is told from the perspective of the authors. As such, some of the reasons given for success or lack of success are subjective interpretations. Nevertheless, the authors' positions provided them an excellent viewpoint to make these judgements. During the second phase of the licensing process, they were the CRBRP Technical Director and the Licensing Manager, respectively, for the Westinghouse Electric Corporation, the prime contractor for the reactor plant

  14. Legal aspects of public participation in the planning/licensing of environmentally related large-scale projects

    International Nuclear Information System (INIS)

    Kurz, A.

    1991-01-01

    A variety of legal problems arise in the planning/licensing of environmentally related large-scale projects associated with the control and evaluation of technical conditions and the ramifications in social and legal policy of the acceptance of, and resistance to, such projects. On the basis of a number of partial studies e.g. of the licensing procedure of a nuclear power plant (Neckar-2 reactor) the author examines the legal aspects of public participation in the administrative procedures of licensing/plans approval. The dichotomy of law and technology is covered, and public participation in administrative procedures is derived legally from the basic constitutional rights and the principle of fair hearing. After an outline of specific administrative procedures, public participation as part of administrative procedures is included in the broad legal framework of licensing/plans approval of environmentally related large-scale projects. The author concludes that public participation, within the framework of the basic decisions established by legislature, is not a tool to be used in deciding basic political conflicts. Instead, public participations in the application of law serves to protect the rights of the individual by ensuring fair proceedings paying attention to the subjective rights of the individual. As it is unable to decide political conflicts, it is also an unsuitable means of establishing of basic societal consensus, or of seeking acceptance of large-scale projects. (orig./HP) [de

  15. Decommissioning Licensing Process of Nuclear Installations in Spain

    International Nuclear Information System (INIS)

    Correa Sainz, Cristina

    2016-01-01

    The Enresa experience related to the decommissioning of nuclear facilities includes the decommissioning of the Vandellos I and Jose Cabrera NPPs. The Vandellos I gas-graphite reactor was decommissioned in about five years (from 1998 to 2003) to what is known as level 2. In February 2010, the decommissioning of Jose Cabrera power plant has been initiated and it is scheduled to be finished by 2018. The decommissioning of a nuclear power plant is a complex administrative process, the procedure for changing from operation to decommissioning is established in the Spanish law. This paper summarizes the legal framework defining the strategies, the main activities and the basic roles of the various agents involved in the decommissioning of nuclear facilities in Spain. It also describes briefly the Licensing documents required to obtain the decommissioning authorization and the Enresa point of view, as licensee, on the licensing decommissioning process. (author)

  16. Licensing of spent fuel storage facility including its physical protection in the Czech Republic

    International Nuclear Information System (INIS)

    Fajman, V.; Sedlacek, J.

    1992-01-01

    The current spent fuel management policies as practised in the Czech Republic are described, and the conception of the fuel cycle back end is outlined. The general principles and the legislative framework are explained of the licensing process concerning spent fuel interim storage facilities, including the environmental impact assessment component. The history is outlined of the licensing process for the spent fuel storage facility at the Dukovany NPP site, including the licensing of the transport and storage cask. The basic requirements placed on the physical safeguarding of the facility and on the licensing process are given. (J.B.). 13 refs

  17. SSM's licensing review of a spent nuclear fuel repository in Sweden

    International Nuclear Information System (INIS)

    Dverstorpand, Bjoern; Stroemberg, Bo

    2014-01-01

    On 16 March 2011 the Swedish Nuclear Fuel and Waste Management Co. (SKB) submitted license applications for a general license to construct, possess and operate a KBS-3 type spent nuclear fuel repository at the Forsmark site, in Oesthammar municipality, and an encapsulation plant in Oskarshamn municipality. The KBS-3 method, which has been developed by SKB over a period of more than 30 years, entails disposing of the spent fuel in copper canisters, surrounded by a swelling bentonite clay, at about 500 m depth in crystalline basement rock. SKB's applications are being evaluated in parallel by the Swedish Radiation Safety Authority (SSM) according to the Act on Nuclear Activities and by the Land and Environmental Court according to the Environmental Code. During the review SSM will act as an expert review body to the Land and Environmental Court in the areas of radiation protection, safety and security/non-proliferation. Both SSM and the court will produce a statement with a recommendation regarding a licensing decision and licensing conditions to the government. The government will make the final decision after consulting the municipalities concerned by SKB's facilities (municipal veto applies). The current licensing decision is just one of several licensing decisions that will be required for the repository. However it is arguably the most important one, because it is the last licensing stage with a broad societal involvement including an environmental impact assessment (EIA) process, national consultations and municipal veto for the concerned municipalities. The licensing steps to follow, should SKB be granted a license by the government, only require approval by SSM. These steps include application for start of actual construction work, test operation and routine operation. (authors)

  18. Regulatory analysis for amendments to regulations for the environmental review for renewal of nuclear power plant operating licenses. Final report

    International Nuclear Information System (INIS)

    1996-05-01

    This regulatory analysis provides the supporting information for a proposed rule that will amend the Nuclear Regulatory Commission's environmental review requirements for applications for renewal of nuclear power plant operating licenses. The objective of the proposed rulemaking is to improve regulatory efficiency by providing for the generic evaluation of certain environmental impacts associated with nuclear plant license renewal. After considering various options, the staff identified and analyzed two major alternatives. With Alternative A, the existing regulations would not be amended. This option requires that environmental reviews be performed under the existing regulations. Alternative B is to assess, on a generic basis, the environmental impacts of renewing the operating license of individual nuclear power plants, and define the issues that will need to be further analyzed on a case-by-case basis. In addition, Alternative B removes from NRC's review certain economics-related issues. The findings of this assessment are to be codified in 10 CFR 51. The staff has selected Alternative B as the preferred alternative

  19. 76 FR 60941 - Policy Regarding Submittal of Amendments for Processing of Equivalent Feed at Licensed Uranium...

    Science.gov (United States)

    2011-09-30

    ... Processing of Equivalent Feed at Licensed Uranium Recovery Facilities AGENCY: Nuclear Regulatory Commission... State-licensed uranium recovery site, either conventional, heap leach, or in situ recovery. DATES... Regarding Submittal of Amendments for Processing of Equivalent Feed at Licensed Uranium Recovery Facilities...

  20. Systems engineering and the licensing of Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kulesa, T., E-mail: tkulesa@us.ibm.com [IBM, Philidelphia, Pennsylvania (United States); Soderholm, K., E-mail: Kristiina.Soderholm@fortum.com [Fortum Power (Finland); Fechtelkotter, P., E-mail: pfech@us.ibm.com [IBM, Boston, Massacheusets (United States)

    2014-07-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  1. Systems engineering and the licensing of Small Modular Reactors

    International Nuclear Information System (INIS)

    Kulesa, T.; Soderholm, K.; Fechtelkotter, P.

    2014-01-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  2. Nuclear power plant licensing: opportunities for improvement

    International Nuclear Information System (INIS)

    1977-06-01

    On April 20, 1977, the Commission directed that recently completed licensing actions be reviewed by the staff for the purpose of identifying ways to improve the effectiveness and efficiency of NRC nuclear power plant licensing activities. This report summarizes the results of a study undertaken by an internal ad hoc Study Group established in response to that directive. The Study Group limited its considerations to safety and environmental review activities. The background, scope, assumptions and objectives of the study are discussed. A prime assumption of this study was that improvements in the efficiency should not be permitted to reduce the current quality achieved in the licensing process. This consideration underlies the conclusions and recommendations of the study

  3. ITER licensing

    International Nuclear Information System (INIS)

    Gordon, C.W.

    2005-01-01

    ITER was fortunate to have four countries interested in ITER siting to the point where licensing discussions were initiated. This experience uncovered the challenges of licensing a first of a kind, fusion machine under different licensing regimes and helped prepare the way for the site specific licensing process. These initial steps in licensing ITER have allowed for refining the safety case and provide confidence that the design and safety approach will be licensable. With site-specific licensing underway, the necessary regulatory submissions have been defined and are well on the way to being completed. Of course, there is still work to be done and details to be sorted out. However, the informal international discussions to bring both the proponent and regulatory authority up to a common level of understanding have laid the foundation for a licensing process that should proceed smoothly. This paper provides observations from the perspective of the International Team. (author)

  4. Licensing of away-from-reactor (AFR) installations

    International Nuclear Information System (INIS)

    Gray, P.L.

    1980-01-01

    Storage of spent fuel at Away-From-Reactor (AFR) installations will allow reactors to continue to operate until reprocessing or other fuel disposal means are available. AFR installations must be licensed by the Nuclear Regulatory Commission (NRC). Although wide experience in licensing reactors exists, the licensing of an AFR installation is a relatively new activity. Only one has been licensed to date. This paper delineates the requirements for licensing an AFR installation and projects a licensing schedule. Because the NRC is developing specific AFR requirements, this schedule is based primarily on draft NRC documents. The major documents needed for an AFR license application are similar to those for a reactor. They include: a Safety Analysis Report (SAR), and Environmental Report (ER), safeguards and security plans, decommissioning plans, proposed technical specifications, and others. However, the licensing effort has one major difference in that for AFR installations it will be a one-step effort, with follow-up, rather than the two-step process used for reactors. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  5. A comparative analysis of the domestic and foreign licensing processes for power and non-power reactors

    International Nuclear Information System (INIS)

    Joe, J. C.; Youn, Y. K.; Kim, W. S.; Kim, H. J.

    2003-01-01

    The System-integrated Modular Advanced Reactor (SMART), a small to medium sized integral type Pressurized Water Reactor (PWR) has been developed in Korea. Now, SMART-P, a 1/5 scaled-down of the SMART, is being developed for the purpose of demonstrating the safety and performance of SMART design. The SMART-P is a first-of-a-kind reactor which is utilized for the research and development of a power reactor. Since the licensing process of such a reactor is not clearly specified in the current Atomic Energy Act, a comparative survey and analysis of domestic and foreign licensing processes for power and non-power reactors has been carried out to develop the rationale and technical basis for establishing the licensing process of such a reactor. The domestic and foreign licensing processes of power and non-power reactors have been surveyed and compared, including those of the U.S.A., Japan, France, U.K., Canada, and IAEA. The general trends in nuclear reactor classification, licensing procedures, regulatory technical requirements, and other licensing requirements and regulations have been investigated. The results of this study will be used as the rationale and technical basis for establishing the licensing process of reactors at development stage such as SMART-P

  6. A model record of technologies for use in a compatible projects for environmental licensing of wind farms; Um modelo de registro das tecnologias para uso na compatibilizacao de projetos para licenciamento ambiental de parques eolicos

    Energy Technology Data Exchange (ETDEWEB)

    Tavares Junior, Wandemberg; Oliveira, Lucia Maria Barbosa [Universidade de Fortaleza (UNIFOR), CE (Brazil)

    2008-07-01

    This article presents the development of a model for survey and registration of technologies that can be inserted in the process of reconciliation of the subjects of the project for environmental licensing of wind farms. It was used a basis for the theoretical model of the Simultaneous Engineering and Failure Mode and Effect Analysis - FMEA. Given the importance that the wind has for the pursuit of sustainable development, this work had as its main objective to contribute to the reduction of negative indices, proposing improvements to the process of project for environmental licensing of wind farms. (author)

  7. 47 CFR 22.949 - Unserved area licensing process.

    Science.gov (United States)

    2010-10-01

    ..., the licensee in the adjacent market (on the requested channel block) has the right to enter into such... sets forth the process for licensing unserved areas in cellular markets on channel blocks for which the... file competing applications for authority to operate a new cellular system in or to expand an existing...

  8. Automation of the DoD Export License Application Review Process

    National Research Council Canada - National Science Library

    Young, Shelton

    2002-01-01

    .... The overall audit objective was to determine whether Federal automation programs supporting the export license and review process could be used to establish a common electronic interface creating...

  9. The Monticello license renewal project

    International Nuclear Information System (INIS)

    Clauss, J.M.; Harrison, D.L.; Pickens, T.A.

    1993-01-01

    Today, 111 nuclear power plants provide over 20 percent of the electrical energy generated in the United States. The operating license of the oldest operating plant will expire in 2003, one-third of the existing operating licenses will expire by 2010 and the newest plant's operating license will expire in 2033. The National Energy Strategy (NES) prepared by the Department of Energy (DOE) assumes that 70 percent of the current operating plants will continue to operate beyond their current license expiration. Power from current operating plants can assist in ensuring an adequate, diverse, and environmentally acceptable energy supply for economic growth and improved U.S. competitiveness. In order to preserve this energy resource, three major tasks must be successfully completed: (1) establishment of regulations, technical standards, and procedures for the preparation and review of License Renewal Applications (LRAs); (2) development of technical criteria and bases for monitoring, refurbishing or replacing plant equipment; and (3) demonstration of the regulatory process by a plant obtaining a renewed license. Since 1986, the DOE has been working with the nuclear industry and the Nuclear Regulatory Commission (NRC) to establish and demonstrate the option to extend the life of a nuclear power plant by renewing the operating license. The Monticello Lead Plant demonstration project was initiated in September 1988, following the Pilot Plant studies. This paper is primarily focused on the status and insights gained from the Northern States Power Company (NSP) Monticello Lead Plant demonstration project. The following information is included: (1) Current Status - Monticello License Renewal Application; (2) Economic Analysis; (3) License Renewal Regulatory Uncertainty Issues; (4) Key Decisions; (5) Management Structure; (6) Technical and Licensing Perspective; (7) NRC Interactions; (8) Summary

  10. Expert evaluation in NPP safety important systems licensing process

    International Nuclear Information System (INIS)

    Mikhail, A Yastrebenetsky; Vasilchenko, V.N.

    2001-01-01

    Expert evaluation of nuclear power plant safety important systems modernization is an integral part of these systems licensing process. The paper contains some aspects of this evaluation which are based on Ukrainian experience of VVER-1000 and VVER-440 modernization. (authors)

  11. Expert evaluation in NPP safety important systems licensing process

    Energy Technology Data Exchange (ETDEWEB)

    Mikhail, A Yastrebenetsky; Vasilchenko, V.N. [Ukrainian State Scientific Technical Center of Nuclear and Radiation Safety (Ukraine)

    2001-07-01

    Expert evaluation of nuclear power plant safety important systems modernization is an integral part of these systems licensing process. The paper contains some aspects of this evaluation which are based on Ukrainian experience of VVER-1000 and VVER-440 modernization. (authors)

  12. Legal aspects of public participation in the planning/licensing of environmentally related large-scale projects

    International Nuclear Information System (INIS)

    Kurz, A.

    1992-02-01

    A variety of legal problems arise in the planning/licensing of environmentally related large-scale projects associated with the control and evaluation of technical conditions and the ramifications in social and legal policy of the acceptance of, and resistance to, such projects. On the basis of a number of partial studies e.g. of the licensing procedure of a nuclear power plant (Neckar-2 reactor), the author examines the legal aspects of public participation in the administrative procedure of licensing/plans approval. The dichotomy of law and technology is covered, and public participation in administrative procedures is derived legally from the basic constitutional rights and the principle of fair hearing. After an outline of specific administrative procedures, public participation as part of administrative procedures is included in the broad legal framework of licensing/plans approval of environmentally related large-scale projects. The author concludes that public participation, within the framework of the basic decisions established by legislature, is not a tool to be used in deciding basic political conflicts. Instead, public participations in the application of law serves to protect the rights of the individual by ensuring fair proceedings paying attention to the subjective rights of the individual. As it is unable to decide political conflicts, it is also an unsuitable means of establishing of basic societal consensus, or of seeking acceptance of large-scale projects. This is reflected also in studies of the legal functions of public participation, according to which the lawfulness of procedures is observed without, however, the legitimacy of the project being achieved. (orig./HP) [de

  13. Specificity in the licensing process of reduced enrichment in the Bulgarian research reactor

    International Nuclear Information System (INIS)

    Vitkova, Marietta; Gorinov, Ivan

    2005-01-01

    The presented paper considers some specific questions of the licensing process regarding the reconstruction of the Bulgarian IRT-2000 research reactor, which includes conversion to the low enriched fuel. This specificity has risen as a result of two facts. The design of the reactor reconstruction was made on the basis of the existing fresh 36% highly enriched fuel. But after finishing of the design process, this fresh highly enriched fuel was shipped back to Russia in the framework of the RERTR program. These facts have involved some changes in both - in the licensing and the design processes. Re-analysis of the neutronic and thermal-hydraulic calculations is required to be made on the base of the technical specifications of the new LEU fuel. To facilitate the licensing process the NRA has adopted regulatory acceptance criteria for approval of the reactor core design with LEU fuel. (author)

  14. A Study on the regulation improvement through the analysis of domestic and international categorization and licensing process for large particle accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Gwon, Da-Yeong; Jeon, Yeo-Ryeong; Kim, Yong-Min [Catholic University of Daegu, Gyeongsan (Korea, Republic of); Jung, Nam-Suk; Lee, Hee-Seock [POSTECH, Pohang (Korea, Republic of)

    2016-10-15

    Many foreign countries use separate criteria and regulation procedure according to the categorization of accelerators. In Korea, nuclear and radiation related facilities are divided into 4 groups: 1) Nuclear Reactor and related facilities, 2) Nuclear fuel cycle, nuclear material facilities, 3) Disposal and transport, 4) Radioisotope and radiation generating devices related facilities. All accelerator facilities are categorized as group 4 regardless of their size and type. For facilities that belong to group 1 and 2, Radiation Environmental Impact Assessment Report(REIR) and Preliminary Decommissioning Plan Report(PDPR) should be submitted in construction licensing stage, but there are no rules about above documents for large particle accelerator facilities. Facilities that belong to 4) RI and RG, only two documents of Radiation Safety Report(RSR) and Safety Control Regulation(SCR) are submitted in licensing stage. Because there is no detailed guidelines according to facilities type, properties of each facility are not considered in preparation and licensing process. If we set up the categorization of accelerator facilities, we can expect the effective and safe construction and operation of the large accelerator facilities on the licensing and operation process. Similarly to other counties' criteria, 50 MeV of particle energy could be used as energy band of large particle accelerator. According to categorization, it is necessary to adopt graded licensing stages and separated safety documents. In case of large particle accelerators, it is appropriate to divide the licensing stages to construction and operation. We currently submit PDPR in case of reactor and related facilities, nuclear fuel cycle, and nuclear material facilities. Depending on the energy of particle accelerators, it is necessary to prepare the decontamination and decommissioning for the decrease of current and future burden from radioactive waste. From the arrangement of separated guidelines on

  15. A Study on the regulation improvement through the analysis of domestic and international categorization and licensing process for large particle accelerator

    International Nuclear Information System (INIS)

    Gwon, Da-Yeong; Jeon, Yeo-Ryeong; Kim, Yong-Min; Jung, Nam-Suk; Lee, Hee-Seock

    2016-01-01

    Many foreign countries use separate criteria and regulation procedure according to the categorization of accelerators. In Korea, nuclear and radiation related facilities are divided into 4 groups: 1) Nuclear Reactor and related facilities, 2) Nuclear fuel cycle, nuclear material facilities, 3) Disposal and transport, 4) Radioisotope and radiation generating devices related facilities. All accelerator facilities are categorized as group 4 regardless of their size and type. For facilities that belong to group 1 and 2, Radiation Environmental Impact Assessment Report(REIR) and Preliminary Decommissioning Plan Report(PDPR) should be submitted in construction licensing stage, but there are no rules about above documents for large particle accelerator facilities. Facilities that belong to 4) RI and RG, only two documents of Radiation Safety Report(RSR) and Safety Control Regulation(SCR) are submitted in licensing stage. Because there is no detailed guidelines according to facilities type, properties of each facility are not considered in preparation and licensing process. If we set up the categorization of accelerator facilities, we can expect the effective and safe construction and operation of the large accelerator facilities on the licensing and operation process. Similarly to other counties' criteria, 50 MeV of particle energy could be used as energy band of large particle accelerator. According to categorization, it is necessary to adopt graded licensing stages and separated safety documents. In case of large particle accelerators, it is appropriate to divide the licensing stages to construction and operation. We currently submit PDPR in case of reactor and related facilities, nuclear fuel cycle, and nuclear material facilities. Depending on the energy of particle accelerators, it is necessary to prepare the decontamination and decommissioning for the decrease of current and future burden from radioactive waste. From the arrangement of separated guidelines on

  16. The Environmental Impact Statement and its role in the nuclear licensing procedure

    International Nuclear Information System (INIS)

    Dolde, K.P.

    1995-01-01

    The author discusses the implementation in Germany of the EC Directive on Environmental Impact Statements in the light of the legal tradition and concepts of law in Germany, especially in the context of the nuclear licensing procedure. His analysis reveals some legal provisions and legal concepts in existing German law that will have to be ''sacrificed'' in order to do justice to the European Union, as in the formation of the body of EC law governing environmental issues, the Anglo-Saxon approach to regulatory law has been the prevailing line of orientation (the EU ecological audit being an example). On the whole, however, the implementation of the EU Directive will not lead to substantial changes beyond procedural modifications. (HP) [de

  17. Challenges of SMR licensing practices

    Energy Technology Data Exchange (ETDEWEB)

    Soderholm, K., E-mail: kristiina.soderholm@fortum.com [Fortum Power, Espoo (Finland)

    2012-12-15

    This paper aims to increase the understanding of high level Nuclear Power Plant (NPP) licensing processes in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their different licensing processes and recent actions in new NPP construction. After discussing their similarities and differences, suitable features for Small Modular Reactor licensing can be emphasized and suggested. Some of the studied licensing processes have elements that are already quite well suited for application to SMRs, but all of these different national processes can benefit from studying and implementing lessons learned from SMR specific licensing needs. The main SMR features to take into account in licensing are standardization of the design, modularity, mass production and serial construction. Modularity can be divided into two different categories: the first category is simply a single unit facility constructed of independently engineered modules (e.g., construction process for Westinghouse AP-1000 NPP) and the second is a facility structure composed of many reactor modules where modules are manufactured in factories and installed into the facility as needed (e.g., NuScale Power SMR design). Short construction schedules will not be fully benefited from if the long licensing process prolongs the commissioning and approach to full-power operation. The focus area of this study is to better understand the possibility of SMR deployment in small nuclear countries, such as Finland, which currently has four operating NPPs. The licensing process needs to be simple and clear to make SMR deployment feasible from an economical point of view. This paper uses public information and interviews with experts to establish the overview of the different licensing processes and their main steps. A high-level comparison of the licensing steps has been carried out. Certain aspects of the aviation industry licensing process have also been studied and certain

  18. 76 FR 63330 - Policy Regarding Submittal of Amendments for Processing of Equivalent Feed at Licensed Uranium...

    Science.gov (United States)

    2011-10-12

    ... Processing of Equivalent Feed at Licensed Uranium Recovery Facilities AGENCY: Nuclear Regulatory Commission... NRC and Agreement State-licensed uranium recovery site. This action is necessary to correct several... read ``(see Page A2 of SECY-99-011, ``Draft Rulemaking Plan: Domestic Licensing of Uranium and Thorium...

  19. Licensing procedures for Low-Level Waste disposal facilities

    International Nuclear Information System (INIS)

    Roop, R.D.; Van Dyke, J.W.

    1985-09-01

    This report describes the procedures applicable to siting and licensing of disposal facilities for low-level radioactive wastes. Primary emphasis is placed on those procedures which are required by regulations, but to the extent possible, non-mandatory activities which will facilitate siting and licensing are also considered. The report provides an overview of how the procedural and technical requirements for a low-level waste (LLW) disposal facility (as defined by the Nuclear Regulatory Commission's Rules 10 CFR Parts 2, 51, and 61) may be integrated with activities to reduce and resolve conflict generated by the proposed siting of a facility. General procedures are described for site screening and selection, site characterization, site evaluation, and preparation of the license application; specific procedures for several individual states are discussed. The report also examines the steps involved in the formal licensing process, including docketing and initial processing, preparation of an environmental impact statement, technical review, hearings, and decisions. It is concluded that development of effective communication between parties in conflict and the utilization of techniques to manage and resolve conflicts represent perhaps the most significant challenge for the people involved in LLW disposal in the next decade. 18 refs., 6 figs

  20. The SHP's environmental licensing and the social communication: case study analysis of Funil and Carangola; O licenciamento ambiental de PCH e a comunicacao social: analise dos estudos de caso de Funil e Carangola

    Energy Technology Data Exchange (ETDEWEB)

    Galhardo, Camila Rocha

    2007-07-01

    Lately, concepts and paradigms have gone through constant alterations, due to high-speed growth the globe faces the dilemma of how to keep this growing and guarantee the survival conditions for next generations. Consequently, it comes into view the requirement for the discussion towards environment preservation and sustainability. In addition to this, humanity has been seeking for solutions to this impasse and the Brazilian Electric Sector equally has looked for alternatives since the beginning of electrification in the country, in early 19{sup th} Century, when the first Small Hydropower Plants (SHPs) were installed to provide energy to the industrial development period. Moreover, at present, this same category of energy generation plant represents a good opportunity, for the reason that they are framed as one of the sources of energy that is considered renewable or less pollutant. In the past years, technological evolution has been accompanied by the national industry of equipment and also the environmental legislation has created tools to mitigate the impacts of a Small Hydroelectric Plants (SHPs). The present research has aimed not only to present in its bibliographical revision the evolution of SHPs concept associated with the environmental aspects but also the application of techniques of social communication in the environmental license process. Furthermore it has looked for new communicative applicable tools in search of a larger public participation among the involved players, which results in important premises for the sustainability course of action. In order to attend those goals, two processes of SHP licensing were analyzed in Minas Gerais State, with main focus in the included Social Communication Program in the Plan of Environmental Control foreseen by the resolution number 006/87 of CONAMA (National Environmental Council). Finally, this research intended to present communicative feasible tools in the dimensioning of the participating actions in the

  1. Risk-assessment techniques and the reactor licensing process

    International Nuclear Information System (INIS)

    Levine, S.

    1979-01-01

    A brief description of the Reactor Safety Study (WASH-1400), concentrating on the engineering aspects of the contribution to reactor accident risks is followed by some comments on how we have applied the insights and techniques developed in this study to prepare a program to improve the safety of nuclear power plants. Some new work we are just beginning on the application of risk-assessment techniques to stablize the reactor licensing process is also discussed

  2. Environmental law in Brazil: analysis of environmental licensing of wind power plants in permanently preserved areas; Direito ambiental no Brasil: analise do licenciamento ambiental de usinas eolicas de preservacao permante

    Energy Technology Data Exchange (ETDEWEB)

    Amaral, Cristiano Abijaode; Pedreira, Adriana Coli; Bleil, Julia Rechia [Associacao Brasileira dos Investidores em Autoproducao de Energia (ABIAPE), Brasilia, DF (Brazil)], E-mails: cristiano@abiape.com.br, adriana@abiape.com.br, julia@abiape.com.br

    2011-04-15

    The Brazilian electric energy matrix is mostly renewable. According to the Generation Information Base (BIG) of the Brazilian Electricity Regulatory Agency (ANEEL), hydroelectricity is responsible for 67.31% of the country's energy. The additional generation comes mostly from fossil fuels, whose use is questioned when it comes to environmental quality and climate change. Despite its abundance, hydroelectric power generation has physical, socioeconomic and environmental limitations. Thus, it is essential to develop alternative technologies, providing security in the supply of electric energy and the maintenance of a clean matrix. Among the alternative technologies available, wind power is the one that has been gaining prominence, domestically and internationally speaking. In the last auction of renewable sources held in August 2010 in Brazil, the energy produced by the plants of sugarcane bagasse (biomass) was traded at an average of R$ 144.20 MWh; wind energy, which was the cheapest, was traded at R$ 130.86, and the energy from small hydropower plants (PCH), at R$ 141.93 MWh. The wind power plants accounted for 70% of the auction, which resulted in a plan for increasing its installed capacity by fivefold, by the year 2013. Brazil has great potential to be explored (estimated 143,000 MW), yet despite being appealing, wind energy still face some challenges. One of them is due to the fact that most potential areas for such energy are found in permanently preservation areas and areas considered national assets, subject to special protection measures. This study aims to investigate whether the regulatory, legal and environmental issues are considered an obstacle to an effective inclusion of wind power generation in Brazil. The study examines the process of environmental licensing of wind power plants, especially those established in permanently preservation areas (APPs) and Coastal Areas. The research methodology consisted of normative framework, judicial decisions

  3. Policy development for environmental licensing and biodiversity offsets in Latin America.

    Directory of Open Access Journals (Sweden)

    Ana Villarroya

    Full Text Available Attempts to meet biodiversity goals through application of the mitigation hierarchy have gained wide traction globally with increased development of public policy, lending standards, and corporate practices. With interest in biodiversity offsets increasing in Latin America, we seek to strengthen the basis for policy development through a review of major environmental licensing policy frameworks in Argentina, Brazil, Chile, Colombia, Mexico, Peru and Venezuela. Here we focused our review on an examination of national level policies to evaluate to which degree current provisions promote positive environmental outcomes. All the surveyed countries have national-level Environmental Impact Assessment laws or regulations that cover the habitats present in their territories. Although most countries enable the use of offsets only Brazil, Colombia, Mexico and Peru explicitly require their implementation. Our review has shown that while advancing quite detailed offset policies, most countries do not seem to have strong requirements regarding impact avoidance. Despite this deficiency most countries have a strong foundation from which to develop policy for biodiversity offsets, but several issues require further guidance, including how best to: (1 ensure conformance with the mitigation hierarchy; (2 identify the most environmentally preferable offsets within a landscape context; (3 determine appropriate mitigation replacement ratios; and (4 ensure appropriate time and effort is given to monitor offset performance.

  4. Policy development for environmental licensing and biodiversity offsets in Latin America.

    Science.gov (United States)

    Villarroya, Ana; Barros, Ana Cristina; Kiesecker, Joseph

    2014-01-01

    Attempts to meet biodiversity goals through application of the mitigation hierarchy have gained wide traction globally with increased development of public policy, lending standards, and corporate practices. With interest in biodiversity offsets increasing in Latin America, we seek to strengthen the basis for policy development through a review of major environmental licensing policy frameworks in Argentina, Brazil, Chile, Colombia, Mexico, Peru and Venezuela. Here we focused our review on an examination of national level policies to evaluate to which degree current provisions promote positive environmental outcomes. All the surveyed countries have national-level Environmental Impact Assessment laws or regulations that cover the habitats present in their territories. Although most countries enable the use of offsets only Brazil, Colombia, Mexico and Peru explicitly require their implementation. Our review has shown that while advancing quite detailed offset policies, most countries do not seem to have strong requirements regarding impact avoidance. Despite this deficiency most countries have a strong foundation from which to develop policy for biodiversity offsets, but several issues require further guidance, including how best to: (1) ensure conformance with the mitigation hierarchy; (2) identify the most environmentally preferable offsets within a landscape context; (3) determine appropriate mitigation replacement ratios; and (4) ensure appropriate time and effort is given to monitor offset performance.

  5. Implantation of hydroelectric power plants and the environmental licensing: the importance of the articulation among the electrical and environment sectors in Brazil; A implantacao de usinas hidreletricas e o processo de licenciamento ambiental: a importancia da articulacao entre os setores eletrico e de meio ambiente no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Facuri, Micheline Ferreira

    2004-07-01

    Hydroelectric power plants stand for the main generation source in Brazil. The basis of the national generator park installed capacity is the exploration of hydraulic potency when the Brazilian energetic die is observed. The atmosphere that the Brazilian electric sector is found now asks for new generator units. In this sense, it would decrease energy offer deficit risk, which collaborates to the electric energy offer expansion effort. This research aims to join and to comment on a group of data and information regarding to the process of implantation of hydroelectric power plants already bid. It includes up to date data on hydroelectric power plants bid since 1996. This data describe the main implications found in the enterprises that are late in their schedules. It shows that the greater the environmental management instruments incorporation in hydroelectric projects planning process, the greater the possibility of new hydraulic generation enterprises with better quality of environmental studies implantation. In this way, it makes even better the process of environmental licensing that could occur in a more adequate deadline. As a result, 28 - out of 54 - enterprises bid are found with environmental problems, which represent 43.30% of bestowed potency. It is possible to infer, thus, that there is a need of more interaction between the electric and the environmental sectors. After analyzing the results, it is concluded that the generation enterprises environmental licensing has been worrying the electric sector agents. This happens due to the need of refinement on environmental studies or due to the need of bureaucracy to get licenses - mainly regarding to judicial actions and environmental issues. Finally, the adequate identification of environmental licensing drags allows a more efficient process to hydroelectric power plants implantation, which generates more consistent and faster results. (author)

  6. Environmental assessment for renewal of source material license No. STB-401 (Docket No. 40-6563)

    International Nuclear Information System (INIS)

    1987-04-01

    This Environmental Assessment contains an assessment of the environmental impact associated with the renewal of the license to operate the Columbian-Tantalum (Cv-Ta) Plant of Mallinckrodt, Inc. at St. Louis, Missouri, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51 (10 CFR Part 51), as amended, of the Nuclear Regulatory Commission regulations. This assessment examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with plant operation. Operational impacts are not anticipated on terrestrial and aquatic ecological resources (including endangered or threatened species) nor on historic and archaeological sites. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project related to land use and employment are anticipated to be minimal

  7. License renewal in the United States

    International Nuclear Information System (INIS)

    Brons, Jack

    2002-01-01

    Full text: Nuclear plants in the United States are licensed for 40 years, a length specified in the Atomic Energy Act of 1954, which laid out much of the regulatory basis for the commercial nuclear industry. The Act, however, made provision for license renewal. The original 40-year license period was chosen arbitrarily by the U.S. Congress because it was the typical period over which utilities recovered their investment in electricity generating plants. Nuclear plants, however, are subject to a rigorous program of Nuclear Regulatory Commission oversight, maintenance and equipment replacement. In effect, they must be in the same operating condition on the last day of their licenses as they were on the first. As the industry matured, it became apparent that there was no physical limitation on the continued operation of nuclear plants past 40 years. The industry turned its attention toward license renewal. When the issue was first raised, the NRC considered stringent process equivalent to seeking a new operating license for each plant. The complexity, length and cost of the process made it unlikely that many nuclear plants would seek license renewal. The nuclear industry worked successfully with NRC on the application of generic principles to license renewal, however, and in 1995, the NRC issued an efficient, tightly-focused rule that made license renewal a safe, viable option. To extend the operating license for a reactor, a company must demonstrate to the NRC that aging effects will be adequately managed during the renewal terms, thus ensuring equipment functionality. The rule allows licensees to apply for extensions of up to 20 years. The first license renewal application was filed in 1998 by the owner of the two-unit Calvert Cliffs plant. Shortly thereafter, an application was filed for the three-unit Oconee Nuclear Station. The NRC renewed the licenses for all five units in 2000, and since then, five more licenses have been renewed. The NRC has received 37

  8. Fuel Receiving and Storage Station. License application, amendment 4

    International Nuclear Information System (INIS)

    1975-04-01

    Amendment No. 4 of the application for licensing the Barnwell Fuel Processing Plant is presented. Information is included on: the quantity and characteristics of nuclear fuel assemblies which can be received and stored; specifications limiting the outside washdown of contaminated casks received for unloading; and definition of environmental monitoring program. (U.S.)

  9. The SHP's environmental licensing and the social communication: case study analysis of Funil and Carangola; O licenciamento ambiental de PCH e a comunicacao social: analise dos estudos de caso de Funil e Carangola

    Energy Technology Data Exchange (ETDEWEB)

    Galhardo, Camila Rocha

    2007-07-01

    Lately, concepts and paradigms have gone through constant alterations, due to high-speed growth the globe faces the dilemma of how to keep this growing and guarantee the survival conditions for next generations. Consequently, it comes into view the requirement for the discussion towards environment preservation and sustainability. In addition to this, humanity has been seeking for solutions to this impasse and the Brazilian Electric Sector equally has looked for alternatives since the beginning of electrification in the country, in early 19{sup th} Century, when the first Small Hydropower Plants (SHPs) were installed to provide energy to the industrial development period. Moreover, at present, this same category of energy generation plant represents a good opportunity, for the reason that they are framed as one of the sources of energy that is considered renewable or less pollutant. In the past years, technological evolution has been accompanied by the national industry of equipment and also the environmental legislation has created tools to mitigate the impacts of a Small Hydroelectric Plants (SHPs). The present research has aimed not only to present in its bibliographical revision the evolution of SHPs concept associated with the environmental aspects but also the application of techniques of social communication in the environmental license process. Furthermore it has looked for new communicative applicable tools in search of a larger public participation among the involved players, which results in important premises for the sustainability course of action. In order to attend those goals, two processes of SHP licensing were analyzed in Minas Gerais State, with main focus in the included Social Communication Program in the Plan of Environmental Control foreseen by the resolution number 006/87 of CONAMA (National Environmental Council). Finally, this research intended to present communicative feasible tools in the dimensioning of the participating actions in the

  10. Licensing procedures for Low-Level Waste disposal facilities

    Energy Technology Data Exchange (ETDEWEB)

    Roop, R.D.; Van Dyke, J.W.

    1985-09-01

    This report describes the procedures applicable to siting and licensing of disposal facilities for low-level radioactive wastes. Primary emphasis is placed on those procedures which are required by regulations, but to the extent possible, non-mandatory activities which will facilitate siting and licensing are also considered. The report provides an overview of how the procedural and technical requirements for a low-level waste (LLW) disposal facility (as defined by the Nuclear Regulatory Commission's Rules 10 CFR Parts 2, 51, and 61) may be integrated with activities to reduce and resolve conflict generated by the proposed siting of a facility. General procedures are described for site screening and selection, site characterization, site evaluation, and preparation of the license application; specific procedures for several individual states are discussed. The report also examines the steps involved in the formal licensing process, including docketing and initial processing, preparation of an environmental impact statement, technical review, hearings, and decisions. It is concluded that development of effective communication between parties in conflict and the utilization of techniques to manage and resolve conflicts represent perhaps the most significant challenge for the people involved in LLW disposal in the next decade. 18 refs., 6 figs.

  11. Meeting United States re-licensing requirements related to environmental protection using innovative technologies

    International Nuclear Information System (INIS)

    Taft, E.P.; Winchell, F.C.; Cook, T.C.

    1998-01-01

    Procedure for meeting re-licensing requirements related to environmental protection and an overview of several new and emerging technologies regarding the development of ways to prevent fish passage through hydraulic turbines at hydroelectric power dams is described. Fish mortality and injury has long been a concern in the hydroelectric industry and research and development efforts have been ongoing since the 1970s to prevent fish passage through turbines. Several new and emerging technologies are examined that have the potential for wide-spread cost-effective applications

  12. Nuclear proliferation and civilian nuclear power. Report of the Nonproliferation Alternative Systems Assessment Program. Volume VI. Safety and environmental considerations for licensing

    International Nuclear Information System (INIS)

    1980-06-01

    This volume of the Nonproliferation Alternative Systems Assessment Program report addresses safety and environmental considerations in licensing the principal alternative nuclear reactors and fuel cycles in the United States for large-scale commercial nuclear power plants. In addition, this volume examines the safety and environmental considerations for licensing fuel service centers. These centers, which have been proposed for controlling sensitive fuel-cycle facilities and special nuclear materials, would contain a combination of such facilities as reprocessing plants, fabrication plants, and reactors. For this analysis, two fuel service center concepts were selected - one with power - generating capability and one without

  13. The SLOWPOKE licensing model

    Energy Technology Data Exchange (ETDEWEB)

    Snell, V. G.; Takats, F.; Szivos, K.

    1989-08-15

    The SLOWPOKE Energy System (SES-10) is a 10 MW heating reactor that has been developed in Canada. It will be capable of running without a licensed operator in continuous attendance, and will be sited in urban areas. It has forgiving safety characteristics, including transient time-scales of the order of hours. A process called `up-front` licensing has been evolved in Canada to identify, and resolve, regulatory concerns early in the process. Because of the potential market in Hungary for nuclear district heating, a licensing plan has been developed that incorporates Canadian licensing experience, identifies specific Hungarian requirements, and reduces the risk of licensing delays by seeking agreement of all parties at an early stage in the program.

  14. Environmental assessment for renewal and consolidation of Materials License Nos. SNM-362, SMB-405, 08-00566-05, 08-00566-10, and 08-00566-12 (Docket No. 70-398)

    International Nuclear Information System (INIS)

    1985-03-01

    The proposed action for which this Environmental Assessment is prepared is the renewal and consolidation of five nuclear materials licenses for radiological activities at the National Bureau of Standards (NBS) site. These licenses cover most uses of radioactive material at NBS except that controlled by the license for operation of the NBS reactor. The reactor license is not associated with and will not be affected by the currently proposed licensing action

  15. Developing pipeline risk methodology for environmental license permit; Metodologia para avaliacao do risco em dutos, no licenciamento ambiental

    Energy Technology Data Exchange (ETDEWEB)

    Arruda, Paulo; Naime, Andre [Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renovaveis (IBAMA), Brasilia, DF (Brazil). Diretoria de Licenciamento e Qualidade Ambiental; Serpa, Ricardo [Companhia de Tecnologia de Saneamento Ambiental (CETESB), Sao Paulo, SP (Brazil). Setor de Analise de Riscos; Mendes, Renato F. [PETROBRAS Engenharia, RJ (Brazil); Ventura, Gilmar [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Some new pipelines undertakings aim to establish connection between gas provinces in the Southeast and consumers in the Northeast of Brazil, in order to supply medium consuming centers and regions with minor potential of development. Consulting companies are carrying out Environmental Assessments studies and among them is the Risk Analyses of these pipeline transmission systems, in order to receive environmental permits by IBAMA, the Federal Brazilian Environmental Agency. In addition, existing interstate pipeline systems which are under IBAMA regulation will also require the same attention. For the purpose of defining a Pipeline Risk Analysis Protocol with methodology and risk criteria, with minimum risk analysis information on a comprehensive process, it has been decided for a 'tour de force' formed by experts from IBAMA and PETROBRAS engineers. The risk assessment protocol is focus on the risk to communities in the neighborhood of these pipelines and on the potential damage to the environment near and far from the ROW. The joined work ended up in two protocols, which attempt to provide environmental license permits for oil pipeline and gas pipelines with minimum contents for risk analysis studies. Another aspect is the environmental risk that has been focused on the contingency plan approach, since there are no consolidated environmental risk criteria for application as a common worldwide sense. The environmental risk mapping - MARA methodology will indicate areas with potential to be affected by leakages along a pipeline system. (author)

  16. Public participation in the licensing of large-scale projects with environmental impact

    International Nuclear Information System (INIS)

    1989-01-01

    As a rule, public participation in licensing and planning procedures for large-scale projects with environmental impact is as controversial as the projects themselves. Against this background, an interdisciplinary examination of several 'cases' of public participation in administrative procedures with varying legal forms is being conducted in a joint research project run by the Department for Applied Systems Analysis (Karlsruher Nuclear Centre) and the Research Institute for Public Administration at the College for Administrative Sciences in Speyer. The actual course of events and the practical experience of the groups involved (authorities, applicants, objectors, experts) are related to the applicable legal arrangements for public participation. The question to be answered is: which expected and unexpected functions do the procedures actually fulfill and which not. Proposals for the amendment of legal policy could be developed upon the foundation of such a diagnosis. The report contains the results of the 'pilot study' on public participation in the licensing of the nuclear power plant GKN-2 in Neckarwestheim and further contributions on the issue of 'public participation', presented within the framework of a research colloquium at the School for Nuclear Technology/Karlsruhe Nuclear Research Centre. (orig.) [de

  17. The delay of the environmental licensing in oil activities and legal implications regarding the oil block; O atraso do licenciamento ambiental nas atividades petroliferas e as implicacoes atinentes ao cumprimento de prazo de bloco licitados

    Energy Technology Data Exchange (ETDEWEB)

    Cavalcante, Hellen Priscilla Marinho; Xavier, Yanko Marcius de Alencar [Universidade Federal do Rio Grande do Norte (UFRN), Natal, RN (Brazil)

    2012-07-01

    This work intends to demonstrate how the delay in issuing environmental licenses by the appropriate bodies affect the correct fulfillment of the exploratory phase of blocks already bid and rendered to the lessees. Thus, it will be conducted a study of the pertaining legislation to the subject, such as Law n. 6.938/81 and its recent amendment by Complementary Law n. 140/2011, as well as the Resolutions issued by the National Environmental Council (CONAMA), addressing the vital importance of the environmental licensing process to the preservation of the environment ante the installation of potentially harmful activities. It is also acknowledged, through the analysis of articles and paragraphs, that there is a legal gap concerning the deadline for issuance of certain documents required to start the licensing procedure by the companies, which ultimately jeopardizes the fulfillment of their exploration activities in due time. Furthermore, there is not a provision regarding the return of the deadline to the lessee when it is suspended or extended due to licensing delays for reasons beyond its control, which cannot lack a reasonable answer. Therefore, as a conclusion, it will be presented a possible solution, so as to ensure the proper accomplishment of the oil activities combined with the preservation of the environment. (author)

  18. Technology neutral licensing requirements: have we been successful?

    International Nuclear Information System (INIS)

    Jamieson, T.

    2009-01-01

    The Canadian Nuclear Safety Commission (CNSC) is Canada's nuclear regulator. In preparation for the licensing of the next generation of nuclear reactors in Canada, the CNSC has made major changes in its processes and procedures associated with all aspects of the licensing life cycle. These include: development of key regulatory documents outlining the CNSC expectations for the design and siting of new reactors; creation of applicant guidelines for completing licensing applications; creation of a comprehensive set of review guides, specifying how topics in applications are to be reviewed; performing pre-project design reviews for proposed new reactor technologies; and streamlining processes wherever possible, such as performing the environmental assessment and license to prepare site activities in parallel. The predicted workload associated with the nuclear renaissance in Canada is real. The CNSC is currently performing: 4 pre-project design reviews (for AECL's ACR-1000 and EC-6, Areva's EPR and Westinghouse's AP-1000), has received applications for 4 new builds (at Darlington, Bruce, Nanticoke and in Alberta) and is in the midst of performing the combined environmental assessment and license to prepare site phases for these sites. This is in addition to the work associated with: the licensing of new uranium mines; oversight of the existing reactor fleet; refurbishments at Bruce/Gentilly/Point Lepreau; license renewal for the NRU reactor; and oversight of our general client base of over 5000 licensees. In this presentation, experience to date with these new processes and procedures will be discussed, including: status of the current new build projects; anticipated new activities; lessons learned, especially the technology neutral approach; application to our other licensed activities, including non-power reactors; and work underway to further develop CNSC methods. Qualifications Needed to Design, Construct and Manufacture Nuclear Systems and Equipment, C. Voutsinos

  19. ISO 14000 and the nuclear licensing

    International Nuclear Information System (INIS)

    Martins, Nadia Soido Falcao

    1999-01-01

    As concern grows for maintaining and improving the quality of the environment and protecting human health, all the world is turning its attention to the potential environmental in pact of their industrial activities. One of the most important contribution in that way is the International Standard ISO 14000 series. In the utilization of nuclear energy, right from the inception, the safety of personnel, environment and the population has been the basic consideration. Over the years well established licenses criteria have been proposed to limit and control the environmental impact of the plant operation and emergencies situation. In this paper are discussed some specific requirements for implementation of the environmental management system specified by ISO 14000 compared to the environmental requirements for nuclear licensing. (author)

  20. Nuclear proliferation and civilian nuclear power: report of the Nonproliferation Alternative Systems Assessment Program. Volume VI. Safety and environmental considerations for licensing

    International Nuclear Information System (INIS)

    1979-12-01

    Volume 6 of the Nonproliferation Alternative Systems Assessment Program report addresses safety and environmental considerations in licensing the principal alternative nuclear reactors and fuel cycles in the United States for large-scale commercial nuclear power plants. In addition, this volume examines the safety and environmental considerations for licensing fuel service centers. These centers, which have been proposed for controlling sensitive fuel-cycle facilities and special nuclear materials, would contain a combination of such facilities as reprocessing plants, fabrication plants, and reactors. For this analysis, two fuel service center concepts were selected - one with power-generating capability and one without. This volume also provides estimates of the time required for development of large-scale commercial reactor systems to reach the construction permit application stage and for fuel-cycle facilities to reach the operating license application stage, which is a measure of the relative technical status of alternative nuclear systems

  1. Analysis of the environmental impact study of PCH (small hydropower plant) Ninho da Aguia. Proposal for optimization of the environmental licensing process using a simplified matrix; Analise do estudo de impacto ambiental da PCH Ninho da Aguia. Proposta de otimizacao do processo de licenciamento ambiental utilizando uma matriz simplificada

    Energy Technology Data Exchange (ETDEWEB)

    Barbosa, Tania Aparecida de Souza

    2004-07-01

    This work intended to study the methodologies used for EIA - Study of Environmental Impact - and propose the adaptation of a simplified matrix for the assessment of environmental impacts regarding small hydropower plants. A case study of Ninho da Aguia SHP, located in the city of Delfim Moreira, MG, was used for elaborating the matrix. The methodology used the analysis of all the negative impacts and they were given combined weight based on a pre-established impact scale. The weights that were given to each impact were distributed according to the combination of features presented in the referred EIA. The results attained show that the environmental damage is reduced by 45% when the mitigating measures suggested by the EIA and by the analysis carried out by this study are applied. Besides, this preliminary proposal will make it possible for environmental licensing process to be accelerated. Today, this process is considered as an inhibiting investment because of it takes too much time. Also, the proposal may be used as initial guidelines regarding the environmental cost of the implementation of enterprises. The proposed matrix shows itself as efficient because it is easy to be used and it is a useful tool for the analysis of projects that will be implemented. (author)

  2. Evaluation of Terminated Nuclear Material Licenses

    International Nuclear Information System (INIS)

    Spencer, K.M.; Zeighami, E.A.

    1999-01-01

    This report presents the results of a six-year project that reviewed material licenses that had been terminated during the period from inception of licensing until approximately late-1994. The material licenses covered in the review project were Part 30, byproduct material licenses; Part 40, source material licenses; and Part 70, special nuclear material licenses. This report describes the methodology developed for the project, summarizes the findings of the license file inventory process, and describes the findings of the reviews or evaluations of the license files. The evaluation identified nuclear material use sites that need review of the licensing material or more direct follow-up of some type. The review process also identified licenses authorized to possess sealed sources for which there was incomplete or missing documentation of the fate of the sources

  3. Libraries and licensing

    Directory of Open Access Journals (Sweden)

    Maja Žumer

    2001-01-01

    Full Text Available In the mid 90s, the abundance of various electronic publications exposed libraries to the problems of licensing electronic content. Various licensing principles have been prepared recently to help libraries in the process; it can be said that in general, the knowledge of licensing issues has improved in libraries of all types. Libraries form consortia in order to gain stronger negotiating positions and obtain better conditions.In the article, new licensing principles are presented in more detail, as well as some domestic and foreign experiences with consortia forming.

  4. The Swedish radiological environmental protection regulations applied in a review of a license application for a geological repository for spent nuclear fuel.

    Science.gov (United States)

    Andersson, Pål; Stark, Karolina; Xu, Shulan; Nordén, Maria; Dverstorp, Björn

    2017-11-01

    For the first time, a system for specific consideration of radiological environmental protection has been applied in a major license application in Sweden. In 2011 the Swedish Nuclear Fuel & Waste Management Co. (SKB) submitted a license application for construction of a geological repository for spent nuclear fuel at the Forsmark site. The license application is supported by a post-closure safety assessment, which in accordance with regulatory requirements includes an assessment of environmental consequences. SKB's environmental risk assessment uses the freely available ERICA Tool. Environmental media activity concentrations needed as input to the tool are calculated by means of complex biosphere modelling based on site-specific information gathered from site investigations, as well as from supporting modelling studies and projections of future biosphere conditions in response to climate change and land rise due to glacial rebound. SKB's application is currently being reviewed by the Swedish Radiation Safety Authority (SSM). In addition to a traditional document review with an aim to determine whether SKB's models are relevant, correctly implemented and adequately parametrized, SSM has performed independent modelling in order to gain confidence in the robustness of SKB's assessment. Thus, SSM has used alternative stylized reference biosphere models to calculate environmental activity concentrations for use in subsequent exposure calculations. Secondly, an alternative dose model (RESRAD-BIOTA) is used to calculate doses to biota that are compared with SKB's calculations with the ERICA tool. SSM's experience from this review is that existing tools for environmental dose assessment are possible to use in order to show compliance with Swedish legislation. However, care is needed when site representative species are assessed with the aim to contrast them to generic reference organism. The alternative modelling of environmental concentrations resulted in much lower

  5. Application of up-front licensing

    Energy Technology Data Exchange (ETDEWEB)

    Grant, S D [Atomic Energy of Canada Ltd., Saskatoon, SK (Canada); Snell, V G [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1996-12-31

    AECL has been pioneering `up-front` licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs.

  6. Application of up-front licensing

    International Nuclear Information System (INIS)

    Grant, S.D.; Snell, V.G.

    1995-01-01

    AECL has been pioneering 'up-front' licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs

  7. Environmental-impact appraisal related to special nuclear materials. License No. SNM-696; Docket No. 70-734

    International Nuclear Information System (INIS)

    1983-06-01

    This Environmental Impact Appraisal is issued by the US Nuclear Regulatory Commission in response to an application by GA Technologies, Inc., (GA) for renewal of Special Nuclear Material (SNM) License No. SNM-696 covering plant operations at San Diego, California. The proposed action provides for continuing research, development, and production activities involving SNM, uranium enriched in the U-235 and U-233 isotopes, and plutonium

  8. Nuclear licensing in Slovenia

    International Nuclear Information System (INIS)

    Prah, M.; Spiler, J.; Vojnovic, D.; Pristavec, M.

    1998-01-01

    The article presents the approach to nuclear licensing in Slovenia. The paper describes, the initialization, internal authorization and review process in the Krsko NPP. The overall process includes preparation, internal independent evaluation, the Krsko Operating Committee and the Krsko Safety Committee review and internal approval. In addition, the continuation of the licensing process is discussed which includes independent evaluation by an authorized institution and a regulatory body approval process. This regulatory body approval process includes official hearing of the licensee, communication with the licensee, and final issuance of a license amendment. The internal evaluation, which follows the methodology of US NRC (defined in 10 CFR 50.59 and NUMARC 125) is described. This concept is partially implemented in domestic legislation.(author)

  9. Conformation of an evaluation process for a license renovation solicitude of a nuclear power plant in Mexico

    International Nuclear Information System (INIS)

    Serrano R, M. L.

    2012-10-01

    So that the construction stages, of operation, closing, dismantlement and the radioactive waste disposal of a nuclear power plant (NPP) are carried out in Mexico, is necessary that the operator has a license, permission or authorization for each stage. In Mexico, these licenses, permissions or authorizations are granted by the Energy Secretariat with base in the verdict of the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS). The operation licenses ar the moment effective for the reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) they will expire respectively in the year 2020 and 2025 for the Unit 1 and Unit 2, for what the CNSNS has begun its preparation before a potential solicitude of the licensee to continue the operation of the NPP-L V. Defining the process to continue and to generate the documents that would help in this phase as normalization, guides, procedures, regulations, controls, etc., is the task that intends to be carried out the regulator body so that the evaluation process is effective and efficient, so much for the same regulator body as for the licensee. This work exposes the advance that the CNSNS has in this aspect and is centered specifically in the conformation of an evaluation process of license renovation solicitude, taking as base what the regulator body of the United States of North America (US NRC) established and following to the IAEA. Also, this work includes statistical of electric power production in Mexico, licensing antecedents for the NPP-L V, a world perspective of the license renovations and the regulation of the US NRC related to the license renovation of a NPP. (Author)

  10. Importance of the licensing process on the safety culture in the Brazilian nuclear fuel cycle facilities

    International Nuclear Information System (INIS)

    Motta, E.S.; Sousa, A.L.B. de; Paiva, R.L.C. de; Mezrahi, A.

    2013-01-01

    The main objective of the Nuclear Fuel Cycle Facilities licensing processes is to ensure the safety of these installations in their entire life cycle (in the installation site selection, designing, construction, pre-operational tests, operational and decommissioning phases). The Brazilian licensing process requires from the operator, among others, before the operating license: (I) a Site Report and a Final Safety Analysis Report, ensuring that all safety related issues are adequately analyzed and understood; (II) a formal structured Management System focused on the installation safety; and (III) dissemination of safety related information to all involved operator employees and subcontractors. Therefore, these requirements reflect in an adequate operator actions and practices, ensuring a working environment with a high level of safety culture. (author)

  11. Importance of the licensing process on the safety culture in the Brazilian nuclear fuel cycle facilities

    Energy Technology Data Exchange (ETDEWEB)

    Motta, E.S.; Sousa, A.L.B. de; Paiva, R.L.C. de; Mezrahi, A., E-mail: emotta@cnen.gov.br [Comissao Nacional de Energia Nuclear (CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2013-07-01

    The main objective of the Nuclear Fuel Cycle Facilities licensing processes is to ensure the safety of these installations in their entire life cycle (in the installation site selection, designing, construction, pre-operational tests, operational and decommissioning phases). The Brazilian licensing process requires from the operator, among others, before the operating license: (I) a Site Report and a Final Safety Analysis Report, ensuring that all safety related issues are adequately analyzed and understood; (II) a formal structured Management System focused on the installation safety; and (III) dissemination of safety related information to all involved operator employees and subcontractors. Therefore, these requirements reflect in an adequate operator actions and practices, ensuring a working environment with a high level of safety culture. (author)

  12. Why and how to implement an environmental management system based on ISO 14001 standard

    International Nuclear Information System (INIS)

    Andrei, Veronica; Glodeanu, Florin; Rotaru, Ion

    1999-01-01

    The Ministry of Waters, Forests and Environmental Protection, the national environmental authority, licenses both subsidiaries of our company, Cernavoda Nuclear Power Plant (NPP) and Pitesti Nuclear Fuel Manufacturing Plant. As these nuclear facilities are designed, built and operated at the level of the international standards, the licensing process did not involve any difficulties related to the environmental impact, from technical point of view. Concerning future environmental licences including here those for other future nuclear facilities as Dry Spent Fuel Storage Facility and Unit 2, some changes should be expected for the licensing process. First of all the environmental impact assessment of any other new nuclear facility will have to consider the Unit 1 environmental impact assessment as point of start. One of the most important aspects should be how to demonstrate the conformance with environmental objectives or targets. (authors)

  13. NRC analysis of the environmental impacts and licensing policies for expanded spent fuel storage in the United States

    International Nuclear Information System (INIS)

    Smith, C.V. Jr.

    1978-01-01

    This paper reviews the findings of the U.S. environmental impact studies on spent fuel storage to the year 2000, addresses design criteria for independent spent fuel storage installations and expresses the position of the NRC for licensing expanded spent fuel storage capabilities until such time as final solutions are established

  14. Environmental qualification design for NPP refurbishment to comply with revised licensing requirements

    International Nuclear Information System (INIS)

    MacBeth, M. J.; Hemmings, R. L.

    2002-01-01

    Recent Canadian Nuclear Regulatory decisions have imposed Environmental Qualification (EQ) requirements for twenty-four Reactor Building (RB) airlocks at the four-unit Pickering Nuclear Generating Station-B (PNGS-B) facility. This paper describes the EQ modification design work completed by CANATOM-NPM for the problematic aspects for such projects. The airlocks allow RB access while providing a containment boundary and are designed to prevent a potential breach of containment for all analysed station conditions. Each PNGS-B unit has three large equipment airlocks and three smaller personnel airlocks. The airlocks must function under postulated worst-case design basis accident(DBA) conditions for assigned mission durations. The design must ensure that accident conditions cannot spuriously initiate an un-requested door opening. CANATOM-NPM reviewed site data to specify the necessary EQ modifications required to satisfy licensing requirements while providing a correct and complete as-found record of the existing airlock installation. The design team assessed the installed airlocks configuration against environmental qualification requirements to finalize the list of necessary modifications. A comprehensive, cross-discipline review of proposed design changes was completed to identify any further changes required to satisfy the final EQ licensing goal. The design team also conducted a design review of the EQ modification installation strategy to integrate the design deliverables with the installation team requirements while attempting to minimize necessary outage time for EQ modification installations. This project was completed on schedule and within the cost limitations required by the client with comprehensive, high quality final design packages. Overall improvements were realized for OPG system drawings and the electronic documentation of design data. The EQ modifications designed by CANATOM-NPM will ensure the continued operation of the PNGS-B NPP past December 31

  15. Reactors licensing: proposal of an integrated quality and environment regulatory structure for nuclear research reactors in Brazil; Licenciamento de reatores: proposta de uma estrutura regulatoria integrada com abordagem em qualidade e meio ambiente para reatores de pesquisa no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Serra, Reynaldo Cavalcanti

    2014-07-01

    A new integrated regulatory structure based on quality and integrated issues has been proposed to be implemented on the licensing process of nuclear research reactors in Brazil. The study starts with a literature review about the licensing process in several countries, all of them members of the International Atomic Energy Agency. After this phase it is performed a comparative study with the Brazilian licensing process to identify good practices (positive aspects), the gaps on it and to propose an approach of an integrated quality and environmental management system, in order to contribute with a new licensing process scheme in Brazil. The literature review considered the following research nuclear reactors: Jules-Horowitz and OSIRIS (France), Hanaro (Korea), Maples 1 and 2 (Canada), OPAL (Australia), Pallas (Holand), ETRR-2 (Egypt) and IEA-R1 (Brazil). The current nuclear research reactors licensing process in Brazil is conducted by two regulatory bodies: the Brazilian National Nuclear Energy Commission (CNEN) and the Brazilian Institute of Environment and Renewable Natural Resources (IBAMA). CNEN is responsible by nuclear issues, while IBAMA by environmental one. To support the study it was applied a questionnaire and interviews based on the current regulatory structure to four nuclear research reactors in Brazil. Nowadays, the nuclear research reactor’s licensing process, in Brazil, has six phases and the environmental licensing process has three phases. A correlation study among these phases leads to a proposal of a new quality and environmental integrated licensing structure with four harmonized phases, hence reducing potential delays in this process. (author)

  16. Environmental impact assessment report

    Energy Technology Data Exchange (ETDEWEB)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J.; Kim, E. H.; Choi, K. S

    2000-10-01

    This report is the revised Environmental Impact Assessment Report which was made and submitted as one of the license documents for TRIGA Research Reactor D and D Project. The Environmental Impact Assessment Report includes introduction of decommissioning plan, status of reactors and environmental impact of surroundings. Also it was assessed and analyzed on radioactivity for environment, and the plan was established to minimize radioactive material release. Finally environmental monitoring plan was established to confirm whether contaminated or not from radioactivity during decommissioning period. According to the assessment results, the risk of excess exposure will be not on environment and public. The first Environmental Impact Assessment Report was submitted to the government for the license and reviewed by Korea Institute of Nuclear Safety. The first Report was revised including answers for the questions arising from review process.

  17. Licensing of New Nuclear Power Plants in Canada

    International Nuclear Information System (INIS)

    Schwarz, Garry; Miller, Doug

    2011-01-01

    The regulatory process for new power plant licensing in Canada, from receipt of the initial application to commercial operation, can be divided into three phases: - Environmental Assessment (EA) and License to Prepare Site; - License to Construct; and - License to Operate. The Nuclear Safety and Control Act (NSCA) does not have provisions for combined licenses for site preparation, construction, or operation. Separate licenses must, therefore, be granted for each phase, and would be issued in sequence. However, applications to prepare a site, to construct and to operate a new nuclear power plant could be assessed in parallel. The total duration from the application for the License to Prepare Site to the issuance of the License to Operate (which is a prerequisite for first fuel load) has been established as 9 years subject to certain factors. To help facilitate this timeline, the CNSC has undertaken an aggressive program of documenting regulatory practices, requirements and guidance to assist applicants in submitting complete applications. Working level procedures to assist CNSC staff in their review of submissions are also under development. Extensive program and project management has been introduced to ensure that timelines will be achieved. In parallel with the above activities, regulatory oversight measures to be employed during site preparation activities and plant construction and commissioning are also being developed. On the international front, the CNSC is participating in the MDEP program to leverage the resources and knowledge of other national regulatory authorities in reviews the CNSC is undertaking. The CNSC also participates in IAEA and other international activities to utilize/adapt international practices as appropriate in Canada. (authors)

  18. Screening Analysis of Criticality Features, Events, and Processes for License Application

    International Nuclear Information System (INIS)

    J.A. McClure

    2004-01-01

    This report documents the screening analysis of postclosure criticality features, events, and processes. It addresses the probability of criticality events resulting from degradation processes as well as disruptive events (i.e., seismic, rock fall, and igneous). Probability evaluations are performed utilizing the configuration generator described in ''Configuration Generator Model'', a component of the methodology from ''Disposal Criticality Analysis Methodology Topical Report''. The total probability per package of criticality is compared against the regulatory probability criterion for inclusion of events established in 10 CFR 63.114(d) (consider only events that have at least one chance in 10,000 of occurring over 10,000 years). The total probability of criticality accounts for the evaluation of identified potential critical configurations of all baselined commercial and U.S. Department of Energy spent nuclear fuel waste form and waste package combinations, both internal and external to the waste packages. This criticality screening analysis utilizes available information for the 21-Pressurized Water Reactor Absorber Plate, 12-Pressurized Water Reactor Absorber Plate, 44-Boiling Water Reactor Absorber Plate, 24-Boiling Water Reactor Absorber Plate, and the 5-Defense High-Level Radioactive Waste/U.S. Department of Energy Short waste package types. Where defensible, assumptions have been made for the evaluation of the following waste package types in order to perform a complete criticality screening analysis: 21-Pressurized Water Reactor Control Rod, 5-Defense High-Level Radioactive Waste/U.S. Department of Energy Long, and 2-Multi-Canister Overpack/2-Defense High-Level Radioactive Waste package types. The inputs used to establish probabilities for this analysis report are based on information and data generated for the Total System Performance Assessment for the License Application, where available. This analysis report determines whether criticality is to be

  19. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1987-05-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  20. USNRC licensing process as related to nuclear criticality safety

    International Nuclear Information System (INIS)

    Ketzlach, N.

    1987-01-01

    The U.S. Code of Federal Regulations establishes procedures and criteria for the issuance of licenses to receive title to, own, acquire, deliver, receive, possess, use, and initially transfer special nuclear material; and establishes and provides for the terms and conditions upon which the Nuclear Regulatory Commission (NRC) will issue such licenses. Section 70.22 of the regulations, ''Contents of Applications'', requires that applications for licenses contain proposed procedures to avoid accidental conditions of criticality. These procedures are elements of a nuclear criticality safety program for operations with fissionable materials at fuels and materials facilities (i.e., fuel cycle facilities other than nuclear reactors) in which there exists a potential for criticality accidents. To assist the applicant in providing specific information needed for a nuclear criticality safety program in a license application, the NRC has issued regulatory guides. The NRC requirements for nuclear criticality safety include organizational, administrative, and technical requirements. For purely technical matters on nuclear criticality safety these guides endorse national standards. Others provide guidance on the standard format and content of license applications, guidance on evaluating radiological consequences of criticality accidents, or guidance for dealing with other radiation safety issues. (author)

  1. Standardization of the licensing process in the United States

    International Nuclear Information System (INIS)

    Villa, R.

    1986-01-01

    The paper discusses a major problem with the design review process for light water reactors. Major confusion exists over the design-basis requirements for a future nuclear power plant in the US. It is not at all clear how the conclusions of a severe accident review are to be integrated into the design approval process. The separation between a design-basis review and a severe accident review makes absolutely no sense if the severe accident review is to have an influence on the design. If an acceptable design is defined during the deterministic review, it is destructive to allow new design-basis requirements to appear during the probabilistic review. Clearly, the review process has too many undefined steps. It is believed that once all of the requirements are defined for a future design, and once the licensing process is exactly defined, the industry can begin a productive and successful standardization program

  2. NRC Analysis of the environmental impacts and licensing policies for expanded spent fuel storage in the United States

    International Nuclear Information System (INIS)

    Clifford, V.S.

    1978-01-01

    The findings of the U.S. environmental impact studies on spent fuel storage to the year 2000 are reviewed, the design criteria for independent spent fuel storage installations are addressed and the position of the NRC for licensing expanded spent fuel storage capabilities, until such time as final solutions are established, is expressed. (author)

  3. Export Controls: Controls Over the Export Licensing Process for Chemical and Biological Items

    National Research Council Canada - National Science Library

    2005-01-01

    .... foreign policy should read this report. The report discusses the effectiveness of the DoD review process for export license applications and updates to Federal export regulations to prevent the proliferation of items that could pose...

  4. Organization and practices on regulatory review in the licensing process of nuclear power plants in Spain

    International Nuclear Information System (INIS)

    Trueba, P.

    1979-01-01

    The actual organisation, practices and experience of the JEN Nuclear Safety Department on the regulatory review in the licensing process of nuclear power plants in Spain, are presented. Topics to be covered are: The structure, organisation, staff and principal functional areas of the NSD, the academic qualifications and work experience of the NSD personnel, recruiting and training, the conduct of the regulatory review during the licensing process and working procedures, the manpower and coverage of the different technical areas, the principal problems and conclusions. (author)

  5. NUMARC view of license renewal criteria

    International Nuclear Information System (INIS)

    Edwards, D.W.

    1989-01-01

    The Atomic Energy Act and the implementing regulations of the US Nuclear Regulatory Commission (NRC) permit the renewal of nuclear plant operating licenses upon expiration of their 40-year license term. However, the regulatory process by which license renewal may be accomplished and the requirements for the scope and content of renewal applications are yet to be established. On August 29, 1988, the NRC published an Advanced Notice of Proposed Rulemaking regarding the subject of license renewal. This Advanced Notice and the NUREG which it references, NUREG-1317, Regulatory Options for Nuclear Plant License Renewal, provide the most recent regulatory thought on this issue. The basic issue addressed by NUREG-1317 is the definition of an adequate licensing basis for the renewal of a plant license. The report contemplates three alternatives in this regard. This paper discusses each of these three proposals. The NUMARC NUPLEX Working Group endorses a license renewal process based on a plant's current licensing basis along with an evaluation of the pertinent components, systems, and structures affected by age-related degradation. The NUMARC NUPLEX Working group believes that an appropriate scope for NRC review of the license renewal application should focus on those safety-significant structures systems, and components subject to significant age-related degradation that are not subject to existing recognized effective replacement, refurbishment, or inspection programs. The paper also briefly discusses NUMARC's view of the role of the Backfit Rule in the license renewal process

  6. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  7. Licensing of MAPLE reactors in Canada

    International Nuclear Information System (INIS)

    Lee, A.G.; Labrie, J.P.; Langman, V.J.

    1999-01-01

    Full text: The Operating Licence for a MAPLE reactor (i.e., a 10 MW(th), pool-type reactor), has been approved by the Atomic Energy Control Board (AECB) on August 16th, 1999. This Operating Licence has been obtained within three years of the initiation of the MDS Nordion Medical Isotopes Reactor (MMIR) project, which entails the design, construction and commissioning of two 10 MW MAPLE reactors at AECL's Chalk River Laboratories. The scope and nature of the information required by the AECB, the licensing process and highlights of the events which led to successfully obtaining the Operating Licence for the MAPLE reactor are discussed. These discussions address all phases of the licensing process (i.e., the environmental assessment in support of siting, the Preliminary Safety Analysis Report, PSAR, in support of design, procurement and construction, the Final Safety Analysis Report, FSAR, in support of commissioning and operations, and the development of suitable quality assurance subprograms for each phase). An overview of some of the unique technical aspects associated with the MAPLE reactors, and how they have been addressed during the licensing process are also provided (e.g., applying CSA N285.0, General Requirements for Pressure-Retaining Systems and Components in CANDU Nuclear Power Plants, to a small, low pressure, low temperature research reactor, confirmation of the performance of the driver fuel via laboratory and/or in-reactor testing, validation of the computer codes used to perform the safety analyses, critical parameter uncertainty assessment, full scale hydraulic testing of the performance of the design, fuel handling, human factors validation, operator training and certification). (author)

  8. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1983-10-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  9. The Texas concurrent characterization, licensing, and development process

    Energy Technology Data Exchange (ETDEWEB)

    Avant, R.V. Jr. [Texas Low-Level Radioactive Waste Disposal Authority, Austin, TX (United States)

    1993-03-01

    The 72nd Texas Legislature specifically delineated a 400-square-mile area in southeast Hudspeth County where siting activities would be limited. The Authority was given unprecedented powers of property access and eminent domain and expanded budget authority to conduct site selection, characterization, and licensing. In the summer of 1991, the Authority identified five general siting areas in the prescribed region, and in the fall of 1991, the Authority narrowed the siting area to one large ranch composed of about 16,000 acres--called the Faskin Ranch. Site characterization began in 1991 and will be complete by September 1993. In September 1991, Authority staff began preparing the license application and included all available information on the Faskin Ranch. At its February meeting, the Authority`s board directed staff to submit the license application to the Texas Water Commission (the new Texas radiation control agency). The license application was submitted on March 2, 1992, and on April 15, 1992, the Commission determined that the application was sufficiently complete to begin review. Discrete technical packages such as groundwater hydrology, surface water hydrology, design, etc., will be submitted to the agency for review on the completion of each package. A schedule has been developed to allow the regulators the maximum time possible to review critical technical areas while minimizing the total review period.

  10. Product Licenses Database Application

    CERN Document Server

    Tonkovikj, Petar

    2016-01-01

    The goal of this project is to organize and centralize the data about software tools available to CERN employees, as well as provide a system that would simplify the license management process by providing information about the available licenses and their expiry dates. The project development process is consisted of two steps: modeling the products (software tools), product licenses, legal agreements and other data related to these entities in a relational database and developing the front-end user interface so that the user can interact with the database. The result is an ASP.NET MVC web application with interactive views for displaying and managing the data in the underlying database.

  11. Final environmental statement concerning rule making. Exemption from licensing requirements for spark-gap irradiators that contain cobalt-60. Docket No. PRM 30-54

    International Nuclear Information System (INIS)

    1977-12-01

    The potential environmental impacts and adverse environmental effects from distribution, use only in commercial-sized oil burners, and disposal of 6000 spark-gap irradiators per year that contain 60 Co are summarized. On the basis of the analysis and evaluation set forth in this statement and after weighing the environmental, economic, technical, and other benefits against environmental costs and after considering available alternatives, it is concluded that the action called for under the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51 is the issuance of an exemption from licensing requirements for spark-gap irradiators that contain 60 Co, subject to the following conditions for the protection of the environment: persons who apply 60 Co to, or persons who incorporate 60 Co into, spark-gap irradiators or persons who import for sale or distribution spark-gap irradiators containing 60 Co are not exempt from the requirements for a license; each spark-gap irradiator shall contain no more than 1 μCi of 60 Co; and the 60 Co shall be applied to the spark-gap irradiators for use in electrically ignited fuel-oil burners having a firing rate of at least 3 gal/h

  12. Comparative assessment of licensing processes of uranium mines in Brazil

    International Nuclear Information System (INIS)

    Silva, K.M.; Menezes, R.M.; Mezrahi, A.

    2002-01-01

    Commercial operation of uranium mining and milling started in Brazil, at the Pocos de Caldas Unit, State of Minas Gerais, in 1982. The Pocos de Caldas Unit was licensed by the Brazilian Regulatory Body (CNEN) and its is now in the decommissioning process. In 2000, a new mining and milling installation, the Caetite Unit, located in State of Bahia, started operation. This paper will discuss how Brazilian Nuclear Energy Commission is licensing the Caetite Unit based on the lessons learned from the Pocos de Caldas Unit. The objective is to draw attention to the importance of the safety assessment for a new unit, specially considering that some wrong decisions were taken for the Pocos de Caldas unit. These decisions lead to less effective long term solutions to protect the environment. Notwithstanding the differences between the two units, it is of great value to use the acquired experience to avoid or minimize the short, medium and long term impacts to the environment and population in the new operation. (author)

  13. Use of the Legal-Institutional Analysis Model to assess hydropower licensing negotiations

    Science.gov (United States)

    Burkardt, N.; Lamb, B.L.; Lamb, B.L.; Garcia de Jalon, D.; Sabaton, C.; Souchon, Y.; Tamai, N.; Robinette, H.R.; Waddle, T.J.; Brinson, A.

    2003-01-01

    In the United States, the Federal Energy Regulatory Commission (FERC) is responsible for issuing or renewing licenses for hydropower projects owned and operated by power companies. During the licensing process, these companies are required to consult with agencies and other parties that are affected by project operating regimes. Typical participants include state and federal fish and wildlife agencies, environmental interest groups, and the FERC. One of the most difficult tasks facing participants is to reach agreement about what kinds of environmental conditions should be placed on license. Researchers at the United States Geological Survey developed a model to analyze the institutional context of natural resource disputes. The Legal-Institutional Analysis Model (LIAM) is a computerized model that allows an analyst to determine the likely behavior of each organization in a conflict. The model also analyzes the types and levels of negotiating power held by each organization. Researchers at the USGS have used the model in several cases involving hydropower license applications. To use the model, they facilitate workshops for stakeholder groups in order to develop a shared understanding of the likely obstacles and opportunities for successful resolution of the issues. This allows a systematic workshop analyses to develop strategies for successful negotiations, because they are able to better understand the negotiation problem and work more effectively with both their allies and their competitors.

  14. Radioisotope thermoelectric generator licensed hardware package and certification tests

    International Nuclear Information System (INIS)

    Goldmann, L.H.; Averette, H.S.

    1994-01-01

    This paper presents the Licensed Hardware package and the Certification Test portions of the Radioisotope Thermoelectric Generator Transportation System. This package has been designed to meet those portions of the Code of Federal Regulations (10 CFR 71) relating to ''Type B'' shipments of radioactive materials. The detailed information for the anticipated license is presented in the safety analysis report for packaging, which is now in process and undergoing necessary reviews. As part of the licensing process, a full-size Certification Test Article unit, which has modifications slightly different than the Licensed Hardware or production shipping units, is used for testing. Dimensional checks of the Certification Test Article were made at the manufacturing facility. Leak testing and drop testing were done at the 300 Area of the US Department of Energy's Hanford Site near Richland, Washington. The hardware includes independent double containments to prevent the environmental spread of 238 Pu, impact limiting devices to protect portions of the package from impacts, and thermal insulation to protect the seal areas from excess heat during accident conditions. The package also features electronic feed-throughs to monitor the Radioisotope Thermoelectric Generator's temperature inside the containment during the shipment cycle. This package is designed to safely dissipate the typical 4500 thermal watts produced in the largest Radioisotope Thermoelectric Generators. The package also contains provisions to ensure leak tightness when radioactive materials, such as a Radioisotope Thermoelectric Generator for the Cassini Mission, planned for 1997 by the National Aeronautics and Space Administration, are being prepared for shipment. These provisions include test ports used in conjunction with helium mass spectrometers to determine seal leakage rates of each containment during the assembly process

  15. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1993-01-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  16. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  17. Current status of construction license of PEFP

    International Nuclear Information System (INIS)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T.

    2012-01-01

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically

  18. Current status of construction license of PEFP

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T. [KAERI, Daejeon (Korea, Republic of)

    2012-10-15

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically.

  19. Commitment tracking in the licensing renewal process: A perspective

    International Nuclear Information System (INIS)

    Gurican, Gregory M.; Breslauer, Stephen K.

    1991-01-01

    The NRC's proposed 10 CFR 54 defines 'Current licensing basis' as inclusive of all licensee commitments. During the last five years, the regulatory commitment tracking group (RCTG) has been developing guidance for member utilities to track such commitments. The RCTG guidance for commitment tracking assists utilities in developing a system to store and maintain commitments related to the CLB. But a majority believe it unlikely that any one commitment tracking system will capture all commitments contained in the proposed definition of a 'Current Licencing Basis'. For future renewal applications the NRC proposes that utilities must identify and compile all licensing basis commitments. In addition, utilities 'shall maintain...(them) in an auditable and retrievable form'. Some utilities are already compiling and tracking licensing basis commitments; others are not. (author)

  20. Applicability of IBAMA normative instruction 146-2007 to pipeline environmental licensing

    Energy Technology Data Exchange (ETDEWEB)

    Basbaum, Marcos A.; Fonseca, Renata A.A. [Servicos de Engenharia Emilio Baumgart Ltda. (SEEBLA), Rio de Janeiro, RJ(Brazil)], e-mail: mbasbaum.seebla@petrobras.com.br, e-mail: renataamorim.seebla@petrobras.com.br; Torggler, Bianca F.; Fernandes, Renato; Guimaraes, Ricardo Z.P. [Petroleo do Brasil S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)], e-mail: torggler@petrobras.com.br, e-mail: renatofer@petrobras.com.br, e-mail: rzaluar@petrobras.com.br

    2009-07-01

    PETROBRAS has been conducting several wildlife programs in response to environmental licensing requirements from IBAMA (Brazilian environmental agency). Since 2007, IBAMA has been requiring the application of the Normative Instruction n. 146 (NI), which establishes criteria for wildlife management in the influence areas of new enterprises. However, experience from PETROBRAS has shown that many of the NI articles are not applicable to pipelines. Thus, a critical analysis of this NI was done based on data from company's wildlife programs. Our analysis indicated that the main NI items that do not apply to pipelines are: 1 - Animal rescue programs in deforested areas and selection of release areas, 2 - More than two fauna monitoring campaigns a year, 3 - Monitoring programs involving all groups of terrestrial vertebrates and also invertebrate classes. The non-applicability of these items is due to: 1 - The majority of pipelines are built in areas without significant native vegetation or with small fragments only, which are usually in secondary stage of ecological succession. Most pipelines scarcely involve removal of primary vegetation, 2 - Pipelines have an influence area restricted to a range of 800 m and the construction directly affects only strips from 20 m to 30 m, 3 - The most relevant impacts associated with pipelines are temporary, and do not persist during their operation. (author)

  1. Environmental licensing for the implementation of small hydroelectric power plants: analysis and optimization proposals for Minas Gerais state, Brazil; Licenciamento ambiental para implantacao de pequenas centrais hidreletricas: analise e propostas de otimizacao para Minas Gerais

    Energy Technology Data Exchange (ETDEWEB)

    Pedreira, Adriana Coli [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Programa de Pos-graduacao em Engenharia da Energia], e-mail: adriana@unifei.edu.br; Dupas, Francisco Antonio [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Inst. de Recursos Naturais], e-mail: dupas@unifei.edu.brT

    2004-07-01

    This document presents the legal and institutional aspects of the environmental licensing for the implementation of small hydroelectric power plants (SHPP). Laws and doctrine related to the topic were researched and concluded for Minas Gerais State with the help of a survey with the enterprises and institutions involved in the process to find out the difficulties that influence the delay of the analysis of the SHPP. It also highlights the importance of environmental zoning as a tool of environmental management for the procedure to obtain these licenses. The results show that 80% of the cases, the institutions do not respect the deadlines, 40% of the studies presented by the enterprises are insufficient, 60% there is lack of human resource and technical capacities of the environment institutions, and 80% non-fulfilment of the laws and non-integration of the institutions. Finally, the study concludes that the difficulties to obtain these licenses are based on the facts mentioned which are, the non-integration of the institutions and also, being recent, on the inexperience of the actors involved. Therefore, it is suggested that deadlines should be imposed for the institutions and the enterprises. There should be training, fund raising for the hiring of technicians, fulfillment of the law and above all, transparency in order to supply the electrical energy demand and guarantee the sustainable development. (author)

  2. Geoprocessing semiautomated applied to licensing of nuclear facilities; Geoprocessamento semi automatizado aplicado ao licenciamento de instalações do setor nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Aline Fabiane Gonçalves de

    2017-07-01

    In recent decades, Brazilian environmental legislation has undergone considerable evolution. This fact occurs concurrently with changes related to environmental studies, which aim increasingly to guarantee sustainability and environmental balance. Thus, it is important to use technological resources to optimize the environmental studies involved in the licensing processes. The present work sought to analyze and direct the application of geotechnologies (Geoprocessing) in environmental studies of the Local Report (RL) of the Center for the Development of Nuclear Technology (CDTN). The proposal to apply the Geoprocessing tools and the possibilities inherent to the Geographic Information Systems (GIS) technology, as a tool to subsidize the environmental studies in accordance with the requirements of the RL was aimed at contributing to the modernization of the stages involved in the process of Nuclear licensing, such as in the structuring and execution of environmental studies, as well as in the activities of environmental monitoring, always considering the precepts in force in the laws and resolutions and standards in force of the National Nuclear Energy Commission (CNEN) for nuclear licensing. In order to achieve the objective, the ArcGis application was adopted and one of its analytical tools Model Builder. This allowed the macro (schematization) of the methodology from the GIS tools applied, presenting as an advantage the efficiency and optimization of the execution time of the procedures in situations where it is necessary to apply the same routine of tasks, besides being editable, Which provides possibilities for adaptations and improvements. In order to achieve this objective, the applicability of the methodology was highly feasible, the model developed by Model Builder / ArcMap, provided a semi-automated process, and provided a flowchart that depicts the procedure to be performed in order to reach the Final process to make inferences and analyzes with greater

  3. Aspectos do licenciamento ambiental da carcinicultura na APA do Delta do Parnaíba Aspects of environmental licensing for carciniculture in EPA of the Delta of Parnaíba River

    Directory of Open Access Journals (Sweden)

    Hamilton Gondim de Alencar Araripe

    2006-12-01

    Full Text Available O presente trabalho tem como foco uma análise do valor do licenciamento ambiental da carcinicultura na APA do Delta do Parnaíba. Realizou-se visitas técnicas a todos empreendimentos instalados até o primeiro semestre de 2004, levantou-se a legislação pertinente, avaliou-se estudos ambientais e relatórios de vistorias técnicas realizadas pelo IBAMA. Concluiu-se que o enquadramento feito pelo IBAMA no processo de licenciamento do que seja área de preservação permanente (APP no manguezal é o ponto crítico para a atividade de carcinicultura.The present research examines the environmental matter in the Environmental Protection Area (EPA of the Delta of the Parnaíba River, focusing on the ambient licensing value. Technical visits to all companies installed in the area until the first semester of 2004 and non-structured interviews were carried out; the existing legislation was raised; and the environmental studies and reports of technical inspections performed by IBAMA were evaluated. The conclusion was that the adjustment made by IBAMA in the ambient licensing process of what is an Area of Permanent Preservation (APP in the mangrove is the critical point to the carciniculture activity.

  4. RM - ODP to express nuclear licensing

    International Nuclear Information System (INIS)

    Barbosa, E.A.; Martucci, M. Jr.

    2002-01-01

    The scope of CNEN (Comissao Nacional de Energia Nuclear) is established by standards and procedures, which allow one context where several activities for nuclear licensing are realized by persons, machines and other entities of real world and by software systems. The CNEN objectives for licensing nuclear installations can be specified and they define how the systems are consisted, its nature, and which important elements were considered relevant for its constitution. The behavior, where the software will be operated, was likely defined in this paper through all aspects of its business process, which means from its licensing context. The concepts and definition showed here defined one specifics business domain, through ODP context. The functionalities of nuclear licensing process, the relationship scope and the rules of interaction that contributed for to specify the nuclear licensing process were defined, too. Therefore, the definition of the domain follows the orientation of architecture concepts and allows to implement the reflection model, where, with the auxiliary from IDEF0 (Integration Definition for Function Modeling) diagrams, the interactions between extern domains were mapped

  5. Assessment of the licensing aspects of HTGR in Yugoslavia

    International Nuclear Information System (INIS)

    Varazdinec, Z.

    1990-01-01

    This paper deals not only with the licensing procedure in Yugoslavia, but also reflects the Utility/Owner approach to the assessment of the licensability of the HTGR during the site selection process and especially during bid evaluation process. Besides the description of the existing procedure which was implemented on licensing of LWR program, the assessment of some licensing aspects of HTGR has been presented to describe possible implementation on licensing procedure. (author)

  6. Assessment of the licensing aspects of HTGR in Yugoslavia

    Energy Technology Data Exchange (ETDEWEB)

    Varazdinec, Z [Institut za Elektroprivredu-Zagreb, Zagreb (Yugoslavia)

    1990-07-01

    This paper deals not only with the licensing procedure in Yugoslavia, but also reflects the Utility/Owner approach to the assessment of the licensability of the HTGR during the site selection process and especially during bid evaluation process. Besides the description of the existing procedure which was implemented on licensing of LWR program, the assessment of some licensing aspects of HTGR has been presented to describe possible implementation on licensing procedure. (author)

  7. Site suitability, selection and characterization: Branch technical position--Low-Level Waste Licensing Branch

    International Nuclear Information System (INIS)

    Siefken, D.; Pangburn, G.; Pennifill, R.; Starmer, R.J.

    1982-04-01

    The staff provides an expanded interpretation of the site suitability requirements in the proposed rule 10 CFR Part 61, a description of the anticipated site selection process, and a detailed discussion of the site characterization program needed to support a license application and environmental report. The paper provides early-on guidance to prospective applicants in these three subject areas

  8. Flexible licensing

    Directory of Open Access Journals (Sweden)

    Martyn Jansen

    2012-07-01

    Full Text Available The case is presented for a more flexible approach to licensing online library resources. Today's distributed education environment creates pressure for UK higher and further education institutions (HEI/FEIs to form partnerships and to develop educational products and roll them out across the globe. Online library resources are a key component of distributed education and yet existing licensing agreements struggle to keep pace with the increasing range of users and purposes for which they are required. This article describes the process of developing a flexible approach to licensing and proposes a new model licence for online library resources which has the adaptability needed in this new global educational landscape. These ideas have been presented and discussed at various workshops across Eduserv's and JISC Collections' higher education and publisher communities, and further consultation is ongoing.

  9. Standard format and content of license applications for plutonium processing and fuel fabrication plants

    International Nuclear Information System (INIS)

    1976-01-01

    The standard format suggested for use in applications for licenses to possess and use special nuclear materials in Pu processing and fuel fabrication plants is presented. It covers general description of the plant, summary safety assessment, site characteristics, principal design criteria, plant design, process systems, waste confinement and management, radiation protection, accident safety analysis, conduct of operations, operating controls and limits, and quality assurance

  10. System engineering in the Nuclear Regulatory Commission licensing process: Program architecture process and structure

    International Nuclear Information System (INIS)

    Romine, D.T.

    1989-01-01

    In October 1987, the U.S. Nuclear Regulatory Commission (NRC) established the Center for Nuclear Waste Regulatory Analyses at Southwest Research Institute in San Antonio, Texas. The overall mission of the center is to provide a sustained level of high-quality research and technical assistance in support of NRC regulatory responsibilities under the Nuclear Waste Policy Act (NWPA). A key part of that mission is to assist the NRC in the development of the program architecture - the systems approach to regulatory analysis for the NRC high-level waste repository licensing process - and the development and implementation of the computer-based Program Architecture Support System (PASS). This paper describes the concept of program architecture, summarizes the process and basic structure of the PASS relational data base, and describes the applications of the system

  11. Methods of Environmental Impact Assessment in Colombia

    Directory of Open Access Journals (Sweden)

    Javier Toro Calderón

    2013-10-01

    Full Text Available The Environmental Impact Assessment (EIA in Colombia constitutes the primary tool for making decisions with respect to projects, works and activities (PWA with potential for significant environmental impacts. In the case of the infrastructure of the PWA, the EIA is mandatory and determines the environmental license (EL for construction and operation. This paper analyzes the methods used to assess the environmental impact of the PWA that have applied for licenses with the Ministry of Environment and Sustainable Development. It was found that the method most frequently used is the qualitative proposal by Conesa, with modifications that reduce the effectiveness of the EIA and favor the subjectivity and bias of the evaluator. Finally a series of recom­mendations to improve the process in the country are proposed.

  12. 75 FR 35510 - License Renewal Interim Staff Guidance Process, Revision 2 Notice of Availability

    Science.gov (United States)

    2010-06-22

    ... Related Regulatory Functions.'' An electronic copy of the revised LR-ISG process is available in the NRC's Agencywide Documents Access and Management System (ADAMS) under Accession No. ML100920158. The revised LR-ISG... interim changes to certain NRC license renewal guidance documents. These guidance documents facilitate the...

  13. Streamlining or sidestepping? Political pressure to revise environmental licensing and EIA in Brazil

    International Nuclear Information System (INIS)

    Bragagnolo, Chiara; Carvalho Lemos, Clara; Ladle, Richard J.; Pellin, Angela

    2017-01-01

    In the Anthropocene, governments are increasingly being forced to take action to minimize or reverse human impacts on the environment. One of the most widespread legal instruments to prevent negative impacts on the environment is Environmental Impact Assessment (EIA). Almost all countries have an EIA system in place aimed at mitigating the diverse impacts causing by development projects. A common drawback of such systems is that they are often ineffective and time-consuming, and are therefore frequently viewed by politicians as “in the way” of development. This is the case in Brazil, where EIA has had a very limited influence on decision-making and where environment reforms (e.g. the new Forest Code) have often been strongly influenced by powerful lobbies (e.g. agribusiness groups, industry actors, etc.) and conservative legislators. Continuing this trend, the most recent political developments have seen the proposal of a series of amendments aimed at “streamlining” the Brazilian EIA system. In this viewpoint, we provide an in depth analysis of the proposed changes, highlighting the serious consequences that would accompany the weakening of environmental licensing and EIA legislation in Brazil.

  14. Conformation of an evaluation process for a license renovation solicitude of a nuclear power plant in Mexico. Part 2

    International Nuclear Information System (INIS)

    Serrano R, M. de L.

    2013-10-01

    At the present time the operation licenses in force for the reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) will expire in the year 2020 and 2025 for the Unit-1 and Unit-2, respectively, for which the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) has begun its preparation to assist a solicitude of the licensee to continue the operation of the NPP-L V. The present work has the purpose of defining the steps to continue and to generate the documents that would help in this process, as the normative, guides, procedures, regulations, controls, etc. so that the evaluation process will be effective and efficient, as much for the regulator organ as for the licensee. The advance carried out in the continuation of the conformation of an evaluation process of license renovation solicitude is also exposed, taking like base the requirements established by the CNSNS, the regulator organ of the United States (US NRC), and the IAEA for license renovation solicitude of this type. A summary of the licenses granted from the beginning of commercial operation of the NPP-L V is included, both units and the amendments to these licenses, explaining the reason of the amendment shortly and in the dates they were granted. A brief exposition of the nuclear power plants to world level that have received extension of its operation is included. The normative that can be applied in a life extension evaluation is presented, the evaluation process to continue with the guides of the US NRC, the reach of the evaluation and the minimum information required to the licensee that should accompany to their solicitude. (author)

  15. Perspective about the US license Renewal for NNPP's

    International Nuclear Information System (INIS)

    Lehnert, D. F.

    2004-01-01

    This article provides and overview of the US License Renewal Rule, 10 CFR 54, and its implementation in the US leading to the preparation and review of a license renewal application. The key regulatory documents and the industry's methodology and guidance for successfully implementing the Rule are discussed. While the process still undergoes change and optimization, it has become predictable and reliable, such that utilities can establish realistic schedules and budgets to complete the license renewal process. Nearly 60% of the US operating units have either received and extended operating license, have submitted their application for review, or have committed to submit an application in the next few years. The article concludes with a discussion of lessons learned from this wealth of experience and some emerging issues that may affect license renewal process. (Author)

  16. Eco-Technology Licensing under Emission Tax: Royalty vs. Fixed-Fee

    OpenAIRE

    Seung-Leul Kim; Sang-Ho Lee

    2014-01-01

    This article considers the licensing strategies of eco-technology when an innovator provides pollution abatement goods to oligopolistic polluting firms that produce consumption goods and emit environmental pollutants. In the presence of emission tax, two types of licensing contracts, royalty and fixed-fee, are examined to analyze market equilibrium and to compare their welfare consequences. We show that an eco-innovator provides a non-exclusive license under a royalty contract while it might ...

  17. Nuclear facilities licensing

    International Nuclear Information System (INIS)

    Carvalho, A.J.M. de.

    1978-01-01

    The need for the adoption of a legal and normative system, defining objectives, pescriptions and the process of nuclear licensing and building of nuclear power plants in Brazil is enphasized. General rules for the development of this system are presented. The Brazilian rules on the matter are discussed. A general view of the German legal system for nuclear power plant licensing and the IAEA recommendations on the subject are finally presented. (A.L.S.L.) [pt

  18. Licensing procedure for nuclear power in Sweden. An international look with lessons for Sweden

    International Nuclear Information System (INIS)

    Gaahlin, Emil; Nilsson, Isabelle; Pettersson, Maria; Soederholm, Patrik

    2011-02-01

    In this study we present an in-depth analysis of the existing licensing procedure for nuclear power in Sweden, and the related processes towards different public authorities. In order to put the existing legislation into context we also analyze the legal and political prerequisites for the establishment of nuclear reactors during the 1970s. The purpose of this report is thus to: (a) analyze the legal and political conditions under which the existing nuclear power plants in Sweden were built; and (b) review and analyze the existing licensing procedure for nuclear power in the country. Four main statutes (and several subordinated regulations) apply in connection with the establishment of a new nuclear plant in Sweden, including the adoption of physical plans, a principal governmental decision on the permissibility of the plant and at least five major licenses. Physical planning according to the Planning and Building Act is primarily a municipal responsibility. A plan has to meet certain environmental requirements; not least the 'provisions on efficient management of natural resources' in the Environmental Code, indicating how different kinds of land and water areas should be used and thereby direct the location of different installations. The Swedish rules are complex and vague in many respects, and may therefore imply major uncertainties for a prospective investor. The legal protection is less unclear if an area is of national interest for a specific purpose, such as nature conservation, where it normally would not be possible to locate, say, a nuclear power plant. An area may also be of national interest for nuclear plants, which of course significantly alters the preconditions in favour of the plant project. The physical planning procedure comprises an 'environmental consideration' of the plan, including an 'environmental impact assessment' (EIA), provided the plan is likely to have significant effects on the environment. This 'programmatic EIA' does however not

  19. A review of tritium licensing requirements

    International Nuclear Information System (INIS)

    Meikle, A.B.

    1982-12-01

    Present Canadian regulations and anticipated changes to these regulations relevant to the utilization of tritium in fusion facilities and in commercial applications have been reviewed. It is concluded that there are no serious licensing obstacles, but there are a number of requirements which must be met. A license will be required from Atomic Energy Control Board if Ontario Hydro tritium is to be applied by other users. A license is required from the Federal Government to export or import tritium. A licensed container will be required for the storage and shipping of tritium. The containers being designed by AECL and Ontario Hydro and which are currently being tested will adequately store and ship all of the Ontario Hydro tritium but are unnecessarily large for the small quantities required by the commercial tritium users. Also, some users may prefer to receive tritium in gaseous form. An additional, smaller container should be considered. The licensing of overseas fusion facilities for the use of tritium is seen as a major undertaking offering opportunities to Canadian Fusion Fuels Technology Project to undertake health, safety and environmental analysis on behalf of these facilities

  20. Environmental impact appraisal for renewal of source material license No. SUB-526 (Docket No. 40-3392)

    International Nuclear Information System (INIS)

    1984-05-01

    Allied Chemical Company operates a privately owned UF 6 production facility at Metropolis, Illinois, At this facility, uranium ore concentrates are converted into uranium hexafluoride (UF 6 ). The UF 6 product from this facility is shipped to Department of Energy (DOE) gaseous diffusion plants for enrichment of the 235 U isotope. This assessment: (1) reviews the operation of the facility during the recent license period by comparing the plant effluent releases or environmental monitoring data with permissible levels of contaminants; and (2) determines the impact on the environment from continued operation of the facility in its current configuration. 10 figures, 44 tables

  1. Institutional Power: Identity, Politics, and Lived Experiences in the Dance License via Portfolio Process

    Science.gov (United States)

    Maloney, Betsy

    2015-01-01

    In this research study, I examined how institutional power affected the experiences of two dance educators attempting to gain their K-12 dance teaching license in Minnesota. My research analyzed the ways in which candidates applying for the portfolio review process constructed, amended, or abandoned their identities as teachers/artists/individuals…

  2. Model and Analytic Processes for Export License Assessments

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, Sandra E.; Whitney, Paul D.; Weimar, Mark R.; Wood, Thomas W.; Daly, Don S.; Brothers, Alan J.; Sanfilippo, Antonio P.; Cook, Diane; Holder, Larry

    2011-09-29

    This paper represents the Department of Energy Office of Nonproliferation Research and Development (NA-22) Simulations, Algorithms and Modeling (SAM) Program's first effort to identify and frame analytical methods and tools to aid export control professionals in effectively predicting proliferation intent; a complex, multi-step and multi-agency process. The report focuses on analytical modeling methodologies that alone, or combined, may improve the proliferation export control license approval process. It is a follow-up to an earlier paper describing information sources and environments related to international nuclear technology transfer. This report describes the decision criteria used to evaluate modeling techniques and tools to determine which approaches will be investigated during the final 2 years of the project. The report also details the motivation for why new modeling techniques and tools are needed. The analytical modeling methodologies will enable analysts to evaluate the information environment for relevance to detecting proliferation intent, with specific focus on assessing risks associated with transferring dual-use technologies. Dual-use technologies can be used in both weapons and commercial enterprises. A decision-framework was developed to evaluate which of the different analytical modeling methodologies would be most appropriate conditional on the uniqueness of the approach, data availability, laboratory capabilities, relevance to NA-22 and Office of Arms Control and Nonproliferation (NA-24) research needs and the impact if successful. Modeling methodologies were divided into whether they could help micro-level assessments (e.g., help improve individual license assessments) or macro-level assessment. Macro-level assessment focuses on suppliers, technology, consumers, economies, and proliferation context. Macro-level assessment technologies scored higher in the area of uniqueness because less work has been done at the macro level. An

  3. Categorisation of Practices and Sources- A Key Issue in Licensing Process

    International Nuclear Information System (INIS)

    Janzekovic, H.; Krizman, M.; Vokal, B.; Petrovic, Z.

    2004-01-01

    The analysis of a radioactive sources inventory in countries with a nuclear programme usually comprises nearly all possible man-made sources available today, from sources related to nuclear power plants to calibration sources used for educational purposes. The risk based licensing process of radiation sources and exposures is a demanding task which could be internationally harmonised by introducing sources and practice related categorisation. The detailed categorisation of radioisotopes, replacing [1], was recently published [2]. The activity ratio (A/D ratio) is used as a basic parameter which is proportional to a risk involved in a use of a radioisotope. Radioisotopes as well as related practices are categorised. No categorisation of ionising sources related to electrical apparatus producing ionising radiation without radioisotopes has been given in literature. In addition, licensees usually perform many different activities with a specific source, so the categorisation of practice should be done, based on a risk involved with a specific practice. The risk is related to the probability of a specific event as well as to the consequences of that event. It is strongly related to the categorisation of source. The main issues related to a licensing process of sources and practices are presented. The review of possible categorisation of radioisotopes and related practices is given and a proposal of a combined harmonised approach of categorisation of sources and practices, based on risk, is given. (Author) 19 refs

  4. Licensing of ''grandfather's'' facilities: Ukrainian experience

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Bogdan, L.; Steinberg, N.

    1995-01-01

    In the former USSR, unlike most countries, radioactive waste management activities including waste disposal needed no license. But after the USSR breakdown the Ukrainian Parliament -- Verkhovna Rada -- invoked the revised Law on Business activities. According to Article 4 of the Law, in order to treat or to dispose radioactive waste every enterprise has to get a special permission or license. In compliance with the Law, the Cabinet of Ministers by its Ordinance of January 13, 1993, authorized the Ukrainian State Committee for Nuclear and Radiation Safety (UkrSCNRS) to issue special permissions or licenses for waste treatment and disposal. And that requirement was valid not only for future activities but also for existing facilities in operation. Taking into account the undergoing legislative process, SCNRS began to develop its licensing process without waiting for the special nuclear laws to be passed. On the basis of the legislation already in effect, first of all the Law on Enterprises (full responsibility of enterprises for their activities) and Law on Business activities (requirement to have a license for special types of activities), the newly formed national regulatory body had to identify all the enterprises that needed to be licensed, to establish relevant procedures, to develop related regulatory documents, to implement these procedures and documents at operating enterprises, and for each case to make a decision concerning feasibility of issuing a license, period of validity and license conditions

  5. Social license to operate: case from brazilian mining industry

    Science.gov (United States)

    Santiago, Ana Lúcia F.; Demajorovic, Jacques; Aledo, Antonio

    2015-04-01

    The approach of the Social License to Operate (SLO) emerges as an important element in academic discussions and business practices related to extractive industries. It appears that in productive activities with great potential to produce economic, social and environmental impacts, conventional approaches based on legal compliance no longer sufficient to legitimize the actions of companies and engagement stakeholders. Studies highlight the need of mining activities receiving a SLO "issued" by companies stakeholders, including society, government, non-governmental organizations, media and communities. However, local communities appears as major stakeholders in governance arrangements, by virtue of its proximity to extractive areas and ability to affect the company's results. Stakeholders with unmet expectations can generate conflicts and risks to the company, the knowledge of these expectations and an awareness of company managers of the importance of Social License to Operate (SLO), can generate strategies and mitigating actions to prevent and or minimize possible conflicts. The concept of SLO arises in engineering extractive industry, when you need to respond to social challenges, beyond the usual environmental challenges, technological and management. According to Franks and Cohen (2012) there is a tendency of engineering sectors, sustainability, environmental, safety and especially in risk mappings, treat the technological issues in a neutral manner, separating the technological research projects of social influences. I want to contribute to the advancement of the debate on stakeholder engagement and adopting as focus on the company's relationship with the community, the aim of this study was to understand how a social project held by one of the largest mining companies in Brazil contributed to the process of SLO. This methodological procedure adopted was a qualitative, descriptive, and exploratory interviews with the communities located in rural areas of direct

  6. Technology of geographical information systems applied to the licensing of nuclear sector installations

    International Nuclear Information System (INIS)

    Oliveira, Aline F.G. De; Barreto, Alberto A.; Carvalho Filho, Carlos A. de; Rodrigues, Paulo Cezar Horta; Moura, Igor Felipe Silva

    2017-01-01

    The nuclear licensing process involves the preparation of documents such as Local's Report (LR), Preliminary Safety Analysis Report (PSAR), Final Safety Analysis Report (FSAR), Physical Protection Plans, Radiation Protection Plans and Emergency plans that must be submit to the National Nuclear Energy Commission (DRS / CNEN) for approval. This work presents an analysis and a guide for the use of Geoprocessing tools in the updating of environmental studies necessary to update the Local's Report (LR) of the Center for the Development of Nuclear Technology (CDTN). The main purpose is to contribute to streamline the execution of steps involved in the nuclear licensing process, such as structuring and executing environmental studies, planning environmental monitoring activities, etc. To achieve the objective, we search for and obtained available data of high reliability in various organs using a methodological flowchart for data acquisition and treatment. The study was develop using the ArcMap 10.2 application from ArcGis, especially the Model Builder analytic tool. This tool allowed the (macro) schematization of the methodology from the applied GIS tools, which presents as advantages to the efficiency and optimization of the execution time of the procedures in situations where it is necessary to apply the same routine of tasks, besides the fact of being editable, which offers possibilities for adaptations and improvements. (author)

  7. Technology of geographical information systems applied to the licensing of nuclear sector installations

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Aline F.G. De; Barreto, Alberto A.; Carvalho Filho, Carlos A. de; Rodrigues, Paulo Cezar Horta [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil); Moura, Igor Felipe Silva, E-mail: afgo@cdtn.br, E-mail: aab@cdtn.br, E-mail: cacf@cdtn.br, E-mail: igorfelipedx@ufmg.br [Universidade Federal de Minas Gerais (UFMG), Belo Horizonte, MG (Brazil)

    2017-07-01

    The nuclear licensing process involves the preparation of documents such as Local's Report (LR), Preliminary Safety Analysis Report (PSAR), Final Safety Analysis Report (FSAR), Physical Protection Plans, Radiation Protection Plans and Emergency plans that must be submit to the National Nuclear Energy Commission (DRS / CNEN) for approval. This work presents an analysis and a guide for the use of Geoprocessing tools in the updating of environmental studies necessary to update the Local's Report (LR) of the Center for the Development of Nuclear Technology (CDTN). The main purpose is to contribute to streamline the execution of steps involved in the nuclear licensing process, such as structuring and executing environmental studies, planning environmental monitoring activities, etc. To achieve the objective, we search for and obtained available data of high reliability in various organs using a methodological flowchart for data acquisition and treatment. The study was develop using the ArcMap 10.2 application from ArcGis, especially the Model Builder analytic tool. This tool allowed the (macro) schematization of the methodology from the applied GIS tools, which presents as advantages to the efficiency and optimization of the execution time of the procedures in situations where it is necessary to apply the same routine of tasks, besides the fact of being editable, which offers possibilities for adaptations and improvements. (author)

  8. 14 CFR 433.7 - Environmental.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Environmental. 433.7 Section 433.7... TRANSPORTATION LICENSING LICENSE TO OPERATE A REENTRY SITE § 433.7 Environmental. An applicant shall provide the FAA with information for the FAA to analyze the environmental impacts associated with proposed...

  9. Licensing Process for Nuclear Power Plants in Pakistan and its comparison with other Countries

    International Nuclear Information System (INIS)

    Iqbal, Javed; Choi, Kwang Sik

    2012-01-01

    Pakistan Nuclear Regulatory Authority (PNRA) was established in January 2001 with the promulgation of the Ordinance, No-III of 2001. Pakistan is one of the countries in the world who intend to expand its nuclear power program for energy generation upto 8800 MWe by 2030. Presently, there are two research reactors and three nuclear power plants in operation and two power plants are under various stages of construction which are expected to be in commercial operation in 2016. It is obvious that the primary responsibility of ensuring safety of nuclear power plants (NPPs) operation rests with the Pakistan Atomic Energy Commission (PAEC). However, PNRA's prime mission is to ensure the safe operation of nuclear and radiation facilities, safe use of radioactive sources and protection of the radiation workers, general public and the environment from the harmful hazards of radiation by formulating and implementing effective regulations. Pakistan Nuclear Regulatory Authority issues authorizations for nuclear power plants in three stages i.e. site permit, construction license and operation license after detailed safety review. This paper presents the licensing process for NPPs in Pakistan and its comparison with SSG-12, USA and Finland

  10. Environmental radiological monitoring methods in TENORM facilities and its relevance

    International Nuclear Information System (INIS)

    Teng Iyu Lin; Ismail Bahari; Muhamad Samudi Yasir

    2011-01-01

    In Malaysia, mineral processing plant is one of the Naturally Occurring Radioactive Material (NORM) processing industries controlled by the Atomic Energy Licensing Board (AELB) through the enforcement of Atomic Energy Licensing Act 1984 (Act 304). The activities generated waste which is called as TENORM wastes. TENORM wastes are mainly found in thorium hydroxide from the processing of xenotime and monazite, and iron oxide and red gypsum from the processing of ilmenite. Other TENORM wastes are scales and sludge from the oil and gas industries, tin slag produced from the smelting of tin, and ilmenite, zircon, and monazite produced from the processing of tin tailing (amang). The environmental and radiological monitoring program is needed to ensure that the TENORM wastes did not caused any contamination to the environment. The wastes vary in the types of samples, parameters of analysis as well as the frequency of monitoring based on licenses conditions issued by the AELB. The main objective of this study is to assess the suitability of licenses condition and the monitoring program required in oil and gas, and mineral processing industries. Study was done by assessing the data submitted to the AELB in order to comply with the licensing requirement. This study had found out that there are a few of licenses conditions that need to be reviewed accordingly based on the processing activity. (Author)

  11. Licensing reform in the USA

    International Nuclear Information System (INIS)

    1991-01-01

    The licensing process for nuclear power plants in the USA is currently in two distinct stages: the issuance of a construction permit followed later by the issuance of an operation license. The ''two-step'' process has come under heavy criticism from the U.S. nuclear industry on the grounds that it causes uncertainty and delays and therefore inhibits new commitments to nuclear power plants. In 1989 the NRC published new regulations for the licensing of nuclear power plants which provide for the issuance of early site permits, safety certifications of standard designs, and combined construction permits and operating licences. The new rule was challenged by intervenors representing antinuclear groups who filed a legal challenge seeking to have the rule set aside on the grounds that it violates the Atomic Energy Act which they allege makes two-step licensing mandatory. In November 1990 the US Court of Appeals upheld the NRC's authority to issue combined licenses. An appeal for a rehearing has been filed. The paper analyses the events and the possible consequences of an adverse court decision. It reviews the options open to the NRC and industry if the court decision is upheld. The possibility of congressional action to amend the Atomic Energy Act is discussed. (author)

  12. Recent developments in Canadian nuclear power plant licensing practices

    International Nuclear Information System (INIS)

    Marchildon, P.

    1985-06-01

    This paper examines the dominant factors which have influenced the safety evaluation and licensing process of current 600 MW reactors. It describes possible modifications to the process which are being considered for the licensing of a second 600 MW reactor at Point Lepreau. The key element is a firm licensing agreement covering the entire licensing cycle, to be established between the proponent and the AECB before a construction licence is issued. Progress accomplished to date in reaching such an agreement is described

  13. Teenagers' licensing decisions and their views of licensing policies: a national survey.

    Science.gov (United States)

    Williams, Allan F

    2011-08-01

    One objective was to determine teenage licensing rates on a national basis, interest in early licensure, and reasons for delay. A second objective was to learn teenagers' opinions about licensing policies, important in states considering ways to upgrade their current licensing systems. One thousand three hundred eighty-three 15- to 18-year-olds completed an online survey in November 2010. They were drawn from a nationally representative panel of US households recruited using probability-based sampling. The panel included cell phone-only households, and Internet access was provided to those without it. Weighting procedures were applied so that the study population represented the national US population of 15- to 18-year-olds. Most teens said that they were interested in getting a license as soon as legally possible, but many had not started the process. At 16, teens were about equally divided among those who had not started, those in the learner stage, and those with a restricted or full license. At 18, 62 percent had full licenses; 22 percent had not started. For those old enough to start, lack of a car, costs, parent availability, ability to get around without a car, and being busy with other activities were leading reasons for delay. The majority of teens were not in favor of higher licensing ages. Forty-six percent thought the minimum learner age should be 16; 30 percent thought the full license age should be 18 or older. The majority approved of night (78%) and passenger (57%) restrictions, and 85 and 93 percent endorsed cell phone and texting bans, respectively. When these policies were packaged together in a single law that included an age 16 start, night, passenger, cell phone and texting bans, and a full license at age 18, 74 percent of teens were in favor. Teenagers are not as supportive of strong licensing policies as parents of teens, but there is evidence that they will support comprehensive policies likely to lead to further reductions in teen crash

  14. The Licensing of New Nuclear Power Plants in Europe

    International Nuclear Information System (INIS)

    Raetzke, C.

    2008-01-01

    After an introduction dealing with the nuclear Renaissance in Europe and the specific situation of Germany and of Italy, the article focuses on the question of licensing processes for new reactors. New nuclear power plant projects involve a substantial investment and electric utilities will only take this decision if the licensing and regulatory risk can be adequately managed. Licensing processes should be predictable and efficient in order to give sufficient assurance to applicants. The article discusses best practice in licensing by giving some examples of suitable licensing processes of other countries. It also highlights international initiatives aimed at harmonizing safety requirements for new reactors and a multinational cooperation in reactor design review. These issues should be carefully considered by any country wanting to get new nuclear started. [it

  15. Current status of the PBMR licensing project

    International Nuclear Information System (INIS)

    Mysen, A.; Clapisson, G.A.; Metcalf, P.E.

    2000-01-01

    The CNS is currently reviewing the PBMR conceptual design from a licensibility point of view. The PBMR concept is based on a High Temperature Gas Cooled Reactor - pebble bed reactor type. It is anticipated that the PBMR design will rely on inherent safety characteristics to contain fission products within fuel over the full range of design basis events. This feature combined with the high temperature integrity of the fuel and structural graphite, allows the safe use of a high coolant temperature, which allows consideration of the future development of this reactor for non-electrical applications of nuclear heat for industrial use. The CNS licensing approach requires that the licensing and design basis of the plant should respect prevailing international norms and practices and that a quantitative risk assessment should demonstrate compliance with the CNS fundamental safety standards. The first stage of the licensing process is now ongoing; this is a pre-application phase, which will result in a statement on licensibility being issued. Identification of the specific documentation requirements and information needed is required across every step of the licensing process. Top level regulatory requirements have been established for the PBMR. They include the CNS fundamental safety standard and basic licensing criteria, which describes requirements on licensees of nuclear installations regarding risk assessment and compliance with the safety criteria and define classification of licensing basis events. (author)

  16. Contribution of studies for environmental licensing to the knowledge of Santa Catarina avifauna in southern Brazil

    Directory of Open Access Journals (Sweden)

    Marcos Antônio Guimarães Azevedo

    2006-03-01

    Full Text Available The knowledge generated by studies for environmental licensing, even with reduced field samplings, can contribute to the recording of species of avifauna or actually extends the distribution in places of low knowledge. This study presents data obtained from preliminary reports of impact where the avifauna in seven projects in different ecosystems of Santa Catarina state was diagnosed between January 2001 and January 2004. Sightings had occurred, mainly, by visual or auditory contacts, using binoculars, hand-recorders and field guides. A total of 232 species of birds had been registered, increasing the known distribution by 66 species in different regions of Santa Catarina. The habitat most damaged by entrepreneurial activity was the forest, a factor of concern regarding the conservation of the avifauna that relied upon it. In general, the risk factors associated with the avifauna in Santa Catarina state are environmental degradation, capture of wildlife for breeding in captivity and, hunting for food.

  17. Regulator process for the authorization of an amendment to the operation license of a nuclear power plant in Mexico

    International Nuclear Information System (INIS)

    Perez, R.; Espinosa V, J.M.; Salgado, J.R.; Mamani, Y.R.

    2005-01-01

    The regulator process by which an authorization is granted from an amendment to the License of Operation of a nuclear power station in Mexico is described. It makes an appointment the effective legal mark, the technical characteristics of the modification, the evaluation process and deposition upon oath of tests and finally the elaboration of the Safety report and the Technical Verdict that is a correspondent for the regulator organism to the Secretary of Energy, the one that in turn is the responsible of granting the amendment the License just as it establishes it the Law. (Author)

  18. License renewal - an idea whose time has come. Hatch nuclear plant license renewal program: an actual example of application of the license renewal rule to the Intake Structure

    International Nuclear Information System (INIS)

    Chandiwala, F.; Evans, W.P.

    1999-01-01

    After the NRC issued a revised license renewal rule in May 1995, the nuclear industry focussed on developing generic industry for implementing the rule and testing the guidance through various demonstration programs and work products in conjunction with the NRC. In addition, plant-specific programs also proceeded forward. These activities show that implementation issues continue to exist. Since the issuance of the rule, the NRC has issued a draft standard review plan for license renewal (SRP-LR), working draft, September 1997. Southern Nuclear Operating Company (SNC) has begun development work on a license renewal application for Plant Hatch Units 1 and 2. Plant Hatch Units 1 and 2 are BWR 4, Mark I plants whose operating licenses expire in 2014 and 2018, respectively. The Plant Hatch initiative also involves teaming with other boiling water reactors (BWRs) to develop the license renewal technology within the BWR fleet, and to support Plant Hatch by providing an oversight role for the application process. The teaming effort involved two other utilities, each being assigned to prepare a common report on a mechanical system or a structure. The common report could be presented to the NRC with modifications to suit the individual plants, thereby saving time and money, and hopefully resulting in quicker approval by the NRC. The desired license renewal process end result is a renewed license with up to a 20 year extension (10CFR 54.31(b)). (orig.)

  19. Guidebook on environmental impact assessment for in situ leach mining projects

    International Nuclear Information System (INIS)

    2005-05-01

    Assessment of the potential environmental impact of an in situ leach (ISL) project is the first step in the permission and licensing process. An Environmental Impact Assessment (EIA) serves as the basis for preparing an Environmental Impact Statement (EIS), which in turn identifies the potential environmental and socioeconomic impact of a proposed project and outlines measures to mitigate the impact. The EIS review process serves to inform the public about a proposed project as well as provide regulatory agencies with assurance that ISL technology will comply with environmental standards, and that project sites can be rehabilitated to pre-mining use. This publication provides a step-by-step description of project parameters that must be addressed in conducting an EIA and preparing an EIS. It also includes EIA/EIS case histories for current operations in Australia, the Czech Republic, Kazakhstan and the United States of America. The publication will be useful to companies considering development of ISL projects and to regulatory personnel who are responsible for writing environmental regulations and licensing ISL projects

  20. Licensing of simple digital devices

    International Nuclear Information System (INIS)

    Jackson, T. W.

    2008-01-01

    The inability to guarantee error-free software gave rise to the potential for common-cause failure of digital safety systems in nuclear power plants. To address this vulnerability, the U. S. Nuclear Regulatory Commission (NRC) required a quality software development process and a defense-in-depth and diversity analysis for digital safety systems. As a result of recent interim [NRC] staff guidance in the digital instrumentation and control (I and C) area, licensing of simple digital devices decreases some regulatory burden with respect to demonstrating a quality software development process and defense-in-depth and diversity analysis. This paper defines simple digital devices and addresses the interim staff guidance that applies to such devices. The paper also highlights the technical aspects that affect the licensing of such devices and incorporates licensing experience in the U.S. to date. (authors)

  1. Environmental qualification program for new designs

    International Nuclear Information System (INIS)

    Doerffer, K.

    2007-01-01

    Qualification of nuclear power plant equipment and components important to safety (ITS) is an integral part of the design process. The qualification methodology differs based on the severity of service conditions (operational and ambient), to which the ITS equipment is exposed. In Canada, the licensing requirements for environmental qualification for new designs are governed by the Canadian Standard Association (CSA) standard, N290.13-2005 titled 'Environmental Qualification of Equipment for CANDU Nuclear Power Plants' and the pre-consultation draft, 'Requirements for Design of Nuclear Power Plants'(DRD), issued for trial use by the Canadian Nuclear Safety Commission (CNSC) in March 2005. This paper will describe AECL's current Environmental Qualification program developed to comply with the above licensing requirements as applied to new designs. The focus will be given to qualification of ITS systems structures and components (SSC) to harsh conditions occurring due to the Design Basis Accidents (DBA). (author)

  2. Project licensing plan for UMTRA [Uranium Mill Tailings Remedial Action] sites

    International Nuclear Information System (INIS)

    1984-07-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process (''Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs

  3. License Auctions with Royalty Contracts for (Winners and) Losers

    OpenAIRE

    Wolfstetter, Elmar; Giebe, Thomas

    2007-01-01

    This paper revisits the licensing of a non–drastic process innovation by an outside innovator to a Cournot oligopoly. We propose a new mechanism that combines a restrictive license auction with royalty licensing. This mechanism is more profitable than standard license auctions, auctioning royalty contracts, fixed–fee licensing, pure royalty licensing, and two-part tariffs. The key features are that royalty contracts are auctioned and that losers of the auction are granted the option to si...

  4. Expertise and participation of the population in the context of nuclear risk: democracy and environmental licensing of Angra 3 nuclear power plant

    Directory of Open Access Journals (Sweden)

    Gláucia Silva

    2010-01-01

    Full Text Available This article discusses the specificity of citizens' "participation" in contexts of decision-making on the acceptance of nuclear risk, demonstrating that such acceptance depends on mediation by professionals who are willing to translate the typical scientific jargon of technical reports and/or produce their own reports, by way of counter-expertise; otherwise, lay people are unable to confer scientific legitimacy to their arguments. The basic empirical references for the current analysis are the recurrent themes from public hearings organized for the licensing of two Brazilian nuclear power plants using German technology, Angra 2 and Angra 3, with emphasis on the latter, now undergoing prior environmental licensing. The forms of "social control" engendered in France serve as a counterpoint for developing the article's argument.

  5. PBMR-SA licensing project organization

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Metcalf, P.E.; Mysen, A.

    2001-01-01

    The South African nuclear regulatory authority, the Council for Nuclear Safety (CNS), is beginning the safety review of the Pebble Bed Modular Reactor (PBMR) design under development by the South African National Electrical Utility, Eskom. This paper describes the CNS licensing process, including the establishment of basic licensing criteria, general design criteria, and specific design rules, as well the safety assessment to be conducted in accordance with the established structure. It also summarises the CNS PBMR review project activities, including the overall organisational arrangements, licensing basis, safety and risk assessment, general operating rules and plant design engineering, and pre-operational testing. (author)

  6. Accident consequence analysis models applied to licensing process of nuclear installations, radioactive and conventional industries

    International Nuclear Information System (INIS)

    Senne Junior, Murillo; Vasconcelos, Vanderley de; Jordao, Elizabete

    2002-01-01

    The industrial accidents happened in the last years, particularly in the eighty's decade, had contributed in a significant way to call the attention to government authorities, industry and society as a whole, demanding mechanisms for preventing episodes that could affect people's safety and environment quality. Techniques and methods already thoroughly used in the nuclear, aeronautic and war industries were then adapted for performing analysis and evaluation of the risks associated to other industrial activities, especially in the petroleum, chemistry and petrochemical areas. Some models for analyzing the consequences of accidents involving fire and explosion, used in the licensing processes of nuclear and radioactive facilities, are presented in this paper. These models have also application in the licensing of conventional industrial facilities. (author)

  7. Nuclear Siting and Licensing Act of 1978. Hearings before the Subcommittee on Energy and Power, Committee on Interstate and Foreign Commerce, House of Representatives, Ninety-Fifth Congress

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    The Subcommittee on Energy and Power conducted hearings on the administration proposal to revise the process by which nuclear power plants are licensed. The purpose of this proposal is to substantially reduce the amount of time needed to license and construct nuclear powerplants. The bill attempts to encourage the early selection of possible sites by separating the process by which such sites are approved fom the process by which plants are licensed. The bill would dispense with the existing requirement that all hearings be adjudicatory, and instead authorize informal hearings on certain issues, principally those which would be conducted pursuant to the National Environmental Policy Act of 1969. The bill would authorize a State which has established a program, consistent with the criteria contained in the act and regulations promulgated by the Nuclear Regulatory Commission, to determine the environmental acceptability of, and/or the need for, a proposed nuclear plant which would be located within its boundaries. Finally, the bill seeks to encourage the use of standardized design and authorizes the NRC to provide funds to intervenors under certain specified conditions

  8. Licensing issues

    International Nuclear Information System (INIS)

    Roberts, J.P.; Desell, L.J.; Birch, M.L.; Berkowitz, L.; Bader, J.F.

    1992-01-01

    To provide guidance for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program, the Nuclear Regulatory Commission (NRC) has issued a draft regulatory guide on the Format and Content for the License Application for the High-Level Waste Repository (FCRG). To facilitate the development of the FCRG, NRC suggested that DOE use the draft guide as the basis for preparing an annotated outline for a license application. DOE is doing so using an iterative process called the Annotated Outline Initiative. DOE;s use of the Initiative will assist in achieving the desired incorporation of actual experience in the FCRG, contribute to the development of shared interpretation and understanding of NRC regulations, and provide other important programmatic benefits described in this paper

  9. What it took to get an NRC license for centralized incineration

    International Nuclear Information System (INIS)

    DiSalvo, R.; Zielenbach, W.

    1987-01-01

    In 1982, Battelle joined five other commercial generators of low level radioactive waste in conducting a study of the technical and economic feasibility and the licensability of a central facility for incinerating LLW. The project generated a license application to the USNRC and supporting documentation related to the safety and environmental impacts of the facility. After thorough review, the NRC has issued a Finding of No Significant Impact and the associated license authorization, which is the first of its kind for an incineration facility

  10. Licensing and advanced fuel designs

    International Nuclear Information System (INIS)

    Davidson, S.L.; Novendstern, E.H.

    1991-01-01

    For the past 15 years, Westinghouse has been actively involved in the development and licensing of fuel designs that contain major advanced features. These designs include the optimized fuel assembly, The VANTAGE 5 fuel assembly, the VANTAGE 5H, and most recently the VANTAGE+ fuel assembly. Each of these designs was supported by extensive experimental data, safety evaluations, and design efforts and required intensive interaction with the US Nuclear Regulatory Commission (NRC) during the review and approval process. This paper presents a description of the licensing approach and how it was utilized by the utilities to facilitate the licensing applications of the advanced fuel designs for their plants. The licensing approach described in this paper has been successfully applied to four major advanced fuel design changes ∼40 plant-specific applications, and >350 cycle-specific reloads in the past 15 years

  11. Current uranium mill licensing issues

    International Nuclear Information System (INIS)

    Scarano, R.A.

    1977-01-01

    The problems encountered to insure environmentally safe mining and milling of uranium ores are reviewed. Emphasis is placed on the management of tailings resulting from milling operations. It is pointed out that although the concentration of radioactivity in the tailings is relatively low, control measures are necessary because of the large quantities involved and because of the long half-life of the parent radionuclides present. The major concerns with mill tailings are radon release to the atmosphere and isolation of the tailings from the human environment. Since it is anticipated that the amount of tailings created by the year 2000 will be more than an order of magnitude greater than the quantities that have been generated during the past 30 years, it is recommended that all mill tailings storage areas be located remote from public contact and in areas such that disruption and dispersion by natural forces and seepage of toxic materials into ground water systems are reduced to the maximum extent achievable. Technical issues that receive attention during the NRC licensing process for uranium mills and the preparation of environmental impact statements are discussed briefly

  12. Department of Energy licensing strategy

    International Nuclear Information System (INIS)

    Frei, M.W.

    1984-01-01

    The Department of Energy (DOE) is authorized by the Nuclear Waste Policy Act of 1982 (Act) to site, design, construct, and operate mined geologic repositories for high-level radioactive wastes and is required to obtain licenses from the Nuclear Regulatory Commission (NRC) to achieve that mandate. To this end the DOE has developed a licensing approach which defines program strategies and which will facilitate and ease the licensing process. This paper will discuss the regulatory framework within which the repository program is conducted, the DOE licensing strategy, and the interactions between DOE and NRC in implementing the strategy. A licensing strategy is made necessary by the unique technical nature of the repository. Such a facility has never before been licensed; furthermore, the duration of isolation of waste demanded by the proposed EPA standard will require a degree of reliance on probabilistic performance assessment as proof of compliance that is a first of a kind for any industry. The licensing strategy is also made necessary by the complex interrelationships among the many involved governmental agencies and even within DOE itself, and because these relationships will change with time. Program activities which recognize these relationships are essential for implementing the Act. The guiding principle in this strategy is an overriding commitment to safeguarding public health and safety and to protecting the environment

  13. The management of the Special Government Take by the Ministry of the Environment: a proposal to integrate with the environmental licensing system; A gestao da Participacao Especial pelo Ministerio do Meio Ambiente: uma proposta de integracao com o licenciamento ambiental

    Energy Technology Data Exchange (ETDEWEB)

    Toledo Neto, Eduardo [Agencia Nacional do Petroleo, Gas Natural e Biocombustiveis (ANP), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The Special Government Take has a function of compensate the municipal, states and federal government for the resulting from externally exploration and production process in a legal percentage system. That financial compensation correspond to a tax in oil exploration for Brazilian Environment Ministry, in consequence of the excess volume of production or the surplus profitability obtained from petroleum or natural gas concession industry, estimated about four billions and three hundred millions of reals in the period of 1999 to 2008. This study analyze the Special Government Take, concluding that no exist the use for the environmental control, as well as applied in projects and studies to get better environmental licensing process, and also no have effects of financial resources to environmental preservation and damages recuperation produced by petroleum industry. (author)

  14. Progress in licensing ITER in Cadarache

    International Nuclear Information System (INIS)

    Rodriguez-Rodrigo, Lina; Girard, Jean-Philippe; Uzan-Elbez, Joelle; Marbach, Gabriel; Garin, Pascal; Rosanvallon, Sandrine

    2005-01-01

    The licensing procedure for ITER in Europe in the framework of the French regulations is a non-prescriptive approach based on a continuous dialogue between the nuclear installation owner (or its representative) and the safety authority. In this paper, the licensing procedure and main safety issues, which are being studied in this process, are presented

  15. Foundation for the adequacy of the licensing bases

    International Nuclear Information System (INIS)

    1991-12-01

    The objective of this report is to describe the regulatory processes that assures that any plant-specific licensing bases will provide reasonable assurance that the operation of nuclear power plants will not be inimical to the public health and safety to the end of the renewal period. It is on the adequacy of this process that the Commission has determined that a formal renewal licensing review against the full range of current safety requirements would not add significantly to safety and is not needed to assure that continued operation throughout the renewal term is not inimical to the public health and safety or common defense and security. This document illustrates in general terms how the regulatory process has evolved in major safety issue areas. It also provides examples illustrating why it is unnecessary to re-review an operating plant's basis, except for age-related degradation unique to license renewal, at the time of license renewal. The report is a supplement to the Statement of Considerations for the Nuclear Regulatory Commission's rule (10 CFR Part 54) that established the criteria and standards governing nuclear power plant license renewal

  16. Non-Power Reactor Operator Licensing Examiner Standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR Part 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, this standard will be revised periodically to accommodate comments and reflect new information or experience

  17. Environmental management of business processes

    Directory of Open Access Journals (Sweden)

    Vesna Čančer

    2000-01-01

    Full Text Available Since the decision-makers in enterprises will accept the goals of environmental management only if they are motivated enough, comprehensible and useful tools should be generated to support environmentally oriented business decision-making. For that reason, a general optimisation model of the multiphase business process is presented in this paper. This model includes the possibilities for an integrated approach to environmental protection so that it can be applied as a scenario by the business process simulation for the evaluation of environmentally oriented business decisions on business performance. Furthermore, development and application possibilities of the presented model are introduced. Some measures of resource efficiency are developed using the presented optimisation model.

  18. Changes in environmental law

    International Nuclear Information System (INIS)

    Mayer-Tasch, P.C.

    1978-01-01

    In this study the changing process of environmental law is depicted which is marked by the ecological crisis and the increasing pressure of the ecological movement. Main emphasis is laid on the analysis of the reform of the ecological licensing and voidance procedures which is in the centre of the discussion about (environmental) law policy as well as on the jurisprudential enforcement of the basic environmental right on life and physical integrity. The volume ends with a study on 'Nuclear Energy, Law and Judiciary Power' - a subject which is of immediate interest and special significance with its far-reaching political consequences for ecology, energy, and economics. (orig.) [de

  19. 78 FR 62322 - Hydropower Regulatory Efficiency Act of 2013; Notice of Rescheduled Two-Year Licensing Process...

    Science.gov (United States)

    2013-10-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD13-9-000] Hydropower... recommendations on the feasibility of a two-year process for the issuance of a license for hydropower development... Hydropower Regulatory Efficiency Act of 2013. The workshop will be held in the Commission Meeting Room at 888...

  20. Nuclear relevant installations licensing methodology in the Argentine Republic

    International Nuclear Information System (INIS)

    Paganini, C.E.

    1986-01-01

    A review of the requeriments of the Nuclear Installations Advisory Committee on Licensing (CALIN) from the nuclear security point of view, is presented. The methodology applied by the CALIN for the licensing in the Argentine Republic is included as well as codes, standards of applications and the interaction between the licensing Authority and the Responsible Entity during the whole process. Finally, the Atucha II nuclear power plant's licensing, in construction at present, is explained and the standard, of the licensing schedule, is presented graphically. (author) [es

  1. ITER Safety and Licensing

    International Nuclear Information System (INIS)

    Girard, J-.P; Taylor, N.; Garin, P.; Uzan-Elbez, J.; GULDEN, W.; Rodriguez-Rodrigo, L.

    2006-01-01

    The site for the construction of ITER has been chosen in June 2005. The facility will be implemented in Europe, south of France close to Marseille. The generic safety scheme is now under revision to adapt the design to the host country regulation. Even though ITER will be an international organization, it will have to comply with the French requirements in the fields of public and occupational health and safety, nuclear safety, radiation protection, licensing, nuclear substances and environmental protection. The organization of the central team together with its partners organized in domestic agencies for the in-kind procurement of components is a key issue for the success of the experimentation. ITER is the first facility that will achieve sustained nuclear fusion. It is both important for the experimental one-of-a-kind device, ITER itself, and for the future of fusion power plants to well understand the key safety issues of this potential new source of energy production. The main safety concern is confinement of the tritium, activated dust in the vacuum vessel and activated corrosion products in the coolant of the plasma-facing components. This is achieved in the design through multiple confinement barriers to implement the defence in depth approach. It will be demonstrated in documents submitted to the French regulator that these barriers maintain their function in all postulated incident and accident conditions. The licensing process started by examination of the safety options. This step has been performed by Europe during the candidature phase in 2002. In parallel to the final design, and taking into account the local regulations, the Preliminary Safety Report (RPrS) will be drafted with support of the European partner and others in the framework of ITER Task Agreements. Together with the license application, the RPrS will be forwarded to the regulatory bodies, which will launch public hearings and a safety review. Both processes must succeed in order to

  2. Dual process theory and intermediate effect: are faculty and residents' performance on multiple-choice, licensing exam questions different?

    Science.gov (United States)

    Dong, Ting; Durning, Steven J; Artino, Anthony R; van der Vleuten, Cees; Holmboe, Eric; Lipner, Rebecca; Schuwirth, Lambert

    2015-04-01

    Clinical reasoning is essential for the practice of medicine. Dual process theory conceptualizes reasoning as falling into two general categories: nonanalytic reasoning (pattern recognition) and analytic reasoning (active comparing and contrasting of alternatives). The debate continues regarding how expert performance develops and how individuals make the best use of analytic and nonanalytic processes. Several investigators have identified the unexpected finding that intermediates tend to perform better on licensing examination items than experts, which has been termed the "intermediate effect." We explored differences between faculty and residents on multiple-choice questions (MCQs) using dual process measures (both reading and answering times) to inform this ongoing debate. Faculty (board-certified internists; experts) and residents (internal medicine interns; intermediates) answered live licensing examination MCQs (U.S. Medical Licensing Examination Step 2 Clinical Knowledge and American Board of Internal Medicine Certifying Examination) while being timed. We conducted repeated analysis of variance to compare the 2 groups on average reading time, answering time, and accuracy on various types of items. Faculty and residents did not differ significantly in reading time [F (1,35) = 0.01, p = 0.93], answering time [F (1,35) = 0.60, p = 0.44], or accuracy [F (1,35) = 0.24, p = 0.63] regardless of easy or hard items. Dual process theory was not evidenced in this study. However, this lack of difference between faculty and residents may have been affected by the small sample size of participants and MCQs may not reflect how physicians made decisions in actual practice setting. Reprint & Copyright © 2015 Association of Military Surgeons of the U.S.

  3. Outline for embedded topical license renewal industry perspective

    International Nuclear Information System (INIS)

    Gilchrist, Jacqueline

    1991-01-01

    This presentation describes the history of the project, selection of the Lead plant; project management, and project implementation, License renewal application contains: implementation plan; technical specifications and program changes; updated safety analysis report supplement; plant specific exemptions; environmental report update

  4. Materials, processes, and environmental engineering network

    Science.gov (United States)

    White, Margo M.

    1993-01-01

    The Materials, Processes, and Environmental Engineering Network (MPEEN) was developed as a central holding facility for materials testing information generated by the Materials and Processes Laboratory. It contains information from other NASA centers and outside agencies, and also includes the NASA Environmental Information System (NEIS) and Failure Analysis Information System (FAIS) data. Environmental replacement materials information is a newly developed focus of MPEEN. This database is the NASA Environmental Information System, NEIS, which is accessible through MPEEN. Environmental concerns are addressed regarding materials identified by the NASA Operational Environment Team, NOET, to be hazardous to the environment. An environmental replacement technology database is contained within NEIS. Environmental concerns about materials are identified by NOET, and control or replacement strategies are formed. This database also contains the usage and performance characteristics of these hazardous materials. In addition to addressing environmental concerns, MPEEN contains one of the largest materials databases in the world. Over 600 users access this network on a daily basis. There is information available on failure analysis, metals and nonmetals testing, materials properties, standard and commercial parts, foreign alloy cross-reference, Long Duration Exposure Facility (LDEF) data, and Materials and Processes Selection List data.

  5. Harmonisation of licensing processes for decommissioning. Options and limitations; Genehmigungsverfahren fuer die Stilllegung der deutschen Kernkraftwerke. Konvoi oder Kakophonie?

    Energy Technology Data Exchange (ETDEWEB)

    Raetzke, Christian

    2016-03-15

    The shutdown of eight reactors in Germany in the wake of Fukushima 2011 and the scheduled phase-out of the remaining units in several steps ending 2022 has obviously triggered a wave of applications for decommissioning and dismantling licences. It would seem natural to strive for a harmonised handling of these processes, analogous to the 'convoi' concept which was successfully employed for licensing and construction of the three most recent German NPPs in the 1980s. However, a comparative analysis shows that the motivation of all players is much different from that of earlier times and that harmonisation of licensing processes for dismantling is not as crucial for operators, authorities and technical support organisations as it was for construction.

  6. The activities of the Technical Independent Supervision Organization (OSTI) on the licensing process of the nucleoelectric installations

    International Nuclear Information System (INIS)

    1993-01-01

    The basic responsibility for licensing nuclear facilities belongs to the government to urban is up to take care of the safety and public health as well as for the installations environment impact. In practicing such responsibility the government should be assured that the operational safety and nucleoelectric installation construction has to be subjected to checks and controls by an independent organism apart from the owners organization responsible for the construction and operation. This paper presents the main activities of the technical independent supervision organization in conformity with the regulations for the licensing process of nuclear facilities as one of the safety principles adopted for Angra 2 nuclear power plant. (B.C.A.)

  7. A BWR licensing experience in the USA

    International Nuclear Information System (INIS)

    Powers, J.; Ogura, C.; Arai, K.; Thomas, S.; Mookhoek, B.

    2015-09-01

    The US-Advanced Boiling Water Reactor (A BWR), certified by the United States Nuclear Regulatory Commission (US NRC), is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. The STP3-4 project has finished the US NRC technical review of the Cola through the final meeting of the Advisory Committee on Reactor Safeguards (ACRS), and the Final Safety Evaluation Report (FSER) is scheduled to be issued by the US NRC in the middle of 2015. The next steps are to support the Mandatory Hearing process, and voting by the NRC commissioners on the motion to grant the Combined License, which is scheduled beginning of 2016 according to US NRC schedule as of March 30, 2015. This paper summarizes the history and progress of the US-A BWR licensing, including the experiences of the Licensee, Nina, and Toshiba as the Epc team worked through the Code of Federal Regulations Title 10 (10-Cfr) Part 52 process, and provides some perspectives on how the related licensing material would also be of value within a 10-Cfr Part 50, two-step process to minimize schedule and financial risks which could arise from ongoing technical developments and regulatory reviews. (Author)

  8. A BWR licensing experience in the USA

    Energy Technology Data Exchange (ETDEWEB)

    Powers, J.; Ogura, C. [Toshiba America Nuclear Energy, Charlotte, North Carolina (United States); Arai, K. [Toshiba Corporation, Yokohama, Kanagawa (Japan); Thomas, S.; Mookhoek, B., E-mail: jim.powers@toshiba.com [Nuclear Innovation North America, Lake Jackson, Texas (United States)

    2015-09-15

    The US-Advanced Boiling Water Reactor (A BWR), certified by the United States Nuclear Regulatory Commission (US NRC), is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. The STP3-4 project has finished the US NRC technical review of the Cola through the final meeting of the Advisory Committee on Reactor Safeguards (ACRS), and the Final Safety Evaluation Report (FSER) is scheduled to be issued by the US NRC in the middle of 2015. The next steps are to support the Mandatory Hearing process, and voting by the NRC commissioners on the motion to grant the Combined License, which is scheduled beginning of 2016 according to US NRC schedule as of March 30, 2015. This paper summarizes the history and progress of the US-A BWR licensing, including the experiences of the Licensee, Nina, and Toshiba as the Epc team worked through the Code of Federal Regulations Title 10 (10-Cfr) Part 52 process, and provides some perspectives on how the related licensing material would also be of value within a 10-Cfr Part 50, two-step process to minimize schedule and financial risks which could arise from ongoing technical developments and regulatory reviews. (Author)

  9. Better Demand Signal, Better Decisions? Evaluation of Big Data in a Licensed Remanufacturing Supply Chain with Environmental Risk Considerations.

    Science.gov (United States)

    Niu, Baozhuang; Zou, Zongbao

    2017-08-01

    Big data ability helps obtain more accurate demand signal. However, is better demand signal always beneficial for the supply chain parties? To answer this question, we investigate a remanufacturing supply chain (RSC), where demand uncertainty is significant, and the value to reduce environmental risk is large. Specifically, we focus on a licensed RSC comprising an original equipment manufacturer (OEM) and a third-party remanufacturer (3PR). The latter pays a unit license fee to the former, and can be risk averse to the demand of remanufactured products. We show that the OEM and the risk-neutral 3PR always have incentives to improve their big data abilities to increase their profits. However, when the 3PR is risk averse, big data might hurt its profit: the value of big data is positive if its demand signal accuracy is sufficiently low. Interestingly, we find that while information sharing hurts the 3PR, it benefits the OEM as well as the supply chain. Thus, if costly information sharing is allowed, a win-win situation can be achieved. We also find that information sharing generates more valuation when the 3PR is risk averse than that when the 3PR is risk neutral. More importantly, we find that the 3PR's risk attitude and demand signal accuracy can significantly mitigate the negative environmental impact (measured by the amount of the waste): (1) the more risk neutral the 3PR is, the better the environment is; (2) the more accurate demand signal is, the better the environment is. © 2017 Society for Risk Analysis.

  10. Licensing reform: a case study in public participation in the nuclear field

    International Nuclear Information System (INIS)

    Nordlinger, M.S.

    1993-01-01

    Political process and legal procedures join to accord the public a significant role in nuclear energy policy decision-making in the United States. We changed the two-stage license process in a combined license process with no separation between the construction and operating license, the policy statement requests public comment, allowing days for responses. It is a middle way between information and taking part in decision

  11. Experience acquired by Furnas for licensing nuclear power plants

    International Nuclear Information System (INIS)

    Silva, A.J.C. da; Xavier, E.E.

    1986-01-01

    The system for licensing of Almirante Alvaro Alberto Nuclear Power Plant-Unit 1 is presented. The process phases for reactor construction and operation are described: preliminary site approval; bases for safety review; partial construction permits; final construction permits; emission of final report of safety analysis; initial operation license and permanent operation license. (M.C.K.) [pt

  12. AP1000R licensing and deployment in the United States

    International Nuclear Information System (INIS)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.; Castiglione, L. L.

    2012-01-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed

  13. The road to MYRRHA. The pre-licensing phase and FEED

    International Nuclear Information System (INIS)

    2014-01-01

    The article discusses the study phase of the future research reactor MYRRHA. This study phase covers three major areas: Research and Development, licensing and engineering. In 2013, substantial progress was made in the licensing and engineering processes: licensing is currently in the pre-licensing phase, while, for engineering, the Front-end Engineering and Design (FEED) contract was signed for the construction of the non-nuclear parts of MYRRHA. The article highlights work associated with the the pre-licensing phase and the FEED.

  14. The Development of Environmental Conservation Youth Camping Using Environmental Education Process

    Directory of Open Access Journals (Sweden)

    Okrit Tee-ngarm

    2016-12-01

    Full Text Available The purposes of this research were: to make youths camp activities using environmental education process, to study and to compare the knowledge and attitude before and after the camp activities for conserving environment by using the process of environmental education. The sample were 30 youths in Mueng district, Sisaket province. The tools used in the research including activity manual, knowledge test, attitudes test and participation measurement. The data were analyzed by percentage, mean, standard deviation, and Paired t-test at significant level .05. The result showed that After camp activities for conserving environment by using the process of environmental education, the participats had mean score of knowledge and attitude toward environmental conservation at was higher than before the activities at statistical significantly level .05. And they had participation in youths camp activities for environmental conservation at the most level.

  15. Environmental impact appraisal for renewal of Special Nuclear Material License No. SNM-1097 (Docket No. 70-1113)

    International Nuclear Information System (INIS)

    1984-06-01

    The proposed action, the full 5-year renewal of License SNM-1097, is necessary for GE to continue producing fuel used in light-water nuclear reactors. The fuel manufacturing operation principally involves converting UF 6 to UO 2 powder, pressing the UO 2 powder into pellets, sintering and grinding the pellets, loading the pellets into Zircaloy tubes, and then assembling the loaded tubes into fuel bundles. A variety of radiological and nonradiological gaseous, liquid, and solid wastes are generated. After treatment, some of the wastes are released to the environment. In addition to the nuclear fuel fabrication operation, there are other operations performed at GE which do not require NRC licensing (e.g., zirconium metal processing, production of fuel bundle and mechanical reactor components, and the manufacture of aircraft engine parts) and are not associated with the proposed action. 28 references, 15 figures, 21 tables

  16. Environmental assessment for the Processing and Environmental Technology Laboratory (PETL)

    International Nuclear Information System (INIS)

    1995-09-01

    The U.S. Department of Energy (DOE) has prepared an environmental assessment (EA) on the proposed Processing and Environmental Technology Laboratory (PETC) at Sandia National Laboratories/New Mexico (SNL/NM). This facility is needed to integrate, consolidate, and enhance the materials science and materials process research and development (R ampersand D) currently in progress at SNL/NM. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, an environmental impact statement is not required, and DOE is issuing this Finding of No Significant Impact (FONSI)

  17. Environmental assessment for the Processing and Environmental Technology Laboratory (PETL)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The U.S. Department of Energy (DOE) has prepared an environmental assessment (EA) on the proposed Processing and Environmental Technology Laboratory (PETC) at Sandia National Laboratories/New Mexico (SNL/NM). This facility is needed to integrate, consolidate, and enhance the materials science and materials process research and development (R&D) currently in progress at SNL/NM. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, an environmental impact statement is not required, and DOE is issuing this Finding of No Significant Impact (FONSI).

  18. Environmental law in change

    International Nuclear Information System (INIS)

    Mayer-Tasch, P.C.

    1978-01-01

    This study describes the process of change of environmental protection law taking place during an ecological crisis and unter the increasing pressure of the ecological movement. Special analyses refer to the reform of the licensing procedures and prodecures of dispute under environmental protection law today being in the focus of juridical discussion. Furthermore they refer to the juridical implementation of the fundamental right of life in an unspoiled and healthy environment. The volume ends with a study on ''Nuclear energy, law and justice'', - a subject being topical and important for its broad political consequences on environment, energy and economy. (orig.) [de

  19. The Finnish Experience with the Construction of Onkalo. Licensing of a repository for nuclear waste in Finland

    International Nuclear Information System (INIS)

    Avolahti, Jaana

    2014-01-01

    construction of a final disposal repository is subject to a construction license granted by the Government. Prerequisites for granting the construction license include the requirement that the plans concerning the facility be sufficient in terms of safety, that the protection of workers and the population's safety have been taken into account appropriately when planning the operations, that the location is appropriate with respect to the planned operations, and that environmental protection measures have been taken into consideration in an appropriate manner in the planning of operations. In addition, the construction of a final disposal repository and an encapsulation plant requires a number of other permits and licenses, such as permits in accordance with the Environmental Protection Act and the Water Act, and a municipal building permit. A construction license for the final disposal repository of spent nuclear fuel must be applied for by the end of the year 2012. A hearing procedure involving municipalities, authorities and citizens will be established during the application process for the construction license. The operation of a nuclear facility requires an operating license issued by the Government. In order to receive a license, it must be ensured that the protection of workers, safety and environmental protection have been taken into account as appropriate. Furthermore, for instance, licenses in accordance with the legislation regulating the transport of hazardous substances are required for the purpose of transporting spent nuclear fuel. The operating license will be granted only for a fixed term. A hearing procedure involving municipalities, authorities and citizens will be established during the operating license application process

  20. Electric energy production and environmental licensing: citizenship in Brazil in time of ecological crisis

    International Nuclear Information System (INIS)

    Bettencourt, Marcia Pires da Luz

    2017-01-01

    The choices of energy sources gain relevance in the face of the ecological crisis which has a central questioning on the modes of production and consumption and that stems from a system which changes everything into merchandise. On one hand, brazilian electricity generation has the advantage of using clean energy in great part of its composition, at least in discourse. On the other hand, though, there are high social and environmental costs, especially for communities living near the regions where projects for the electricity sector are built. This research aimed to identify and analyse different modes society takes part in the process of choosing energy sources for electricity generation in Brazil. It discusses the links between the ecological crisis and the production of electrical energy; how the institutional mechanisms for social participation on issues related to the production of electric power in Brazil work; and, how civil society participates in environmental licensing in the National Environment Council (CONAMA). A set of related approaches to the nature of the ecological crisis and the forms of social participation was adopted in the theoretical framework and an analysis of the electric sector panorama in Brazil has been drawn up. In order to investigate the forms society participates in issues related to the composition of the brazilian electricity matrix, the methodology comprised a documentary analysis and a case study. They included three categories of actors: (1) CONAMA's councilors, (2) experts from the Field; and (3) actors involved in the diagnosis study, planning and management of the electricity sector. The research identified inconsistencies, ambiguities and other relevant issues about the participation of society in the production of electrical energy. Such issues are related to: deficiencies in the mechanisms for information access; lack of transparency and patterns in internal documents; lack of social participation in the elaboration of

  1. 24 CFR 3286.207 - Process for obtaining installation license.

    Science.gov (United States)

    2010-04-01

    ... installation license must submit verification of the experience required in § 3286.205(a). This verification may be in the form of statements by past or present employers or a self-certification that the applicant meets those experience requirements, but HUD may contact the applicant for additional verification...

  2. License plate recognition using DTCNNs

    NARCIS (Netherlands)

    ter Brugge, M.H; Stevens, J.H; Nijhuis, J.A G; Spaanenburg, L; Tavsanonoglu, V

    1998-01-01

    Automatic license plate recognition requires a series of complex image processing steps. For practical use, the amount of data to he processed must be minimized early on. This paper shows that the computationally most intensive steps can be realized by DTCNNs. Moreover; high-level operations like

  3. 14 CFR 420.17 - Bases for issuance of a license.

    Science.gov (United States)

    2010-01-01

    ...) Issuing a license would not jeopardize foreign policy or national security interests of the United States... § 420.15; (2) The FAA has completed an analysis of the environmental impacts associated with the...

  4. Postulated licensing schedule for an independent spent-fuel-storage installation

    International Nuclear Information System (INIS)

    Ludwick, J.D.

    1982-11-01

    A review of licensing requirements, processes, and anticipated actions for independent spent fuel storage installations (ISFSIs) was conducted in order to develop an estimated schedule and sequence of events for licensing a new ISFSI. This estimate will be useful to potential ISFSI owners in planning for the licensing of their facilities. It is concluded that, although many uncertainties exist with respect to such things as legal appeals, about 29 months are estimated to elapse between license application and license issuance for an ISFSI. This estimate is in reasonable agreement with a previous time estimate for licensing an ISFSI, and, taking into account the special circumstances involved, with the actual licensing schedule for the GE-Morris ISFSI. However, individual portions of the licensing schedule from each case studied sometimes vary significantly

  5. Overview of NORM and activities by a NORM licensed permanent decontamination and waste processing facility

    Energy Technology Data Exchange (ETDEWEB)

    Mirro, G.A. [Growth Resources, Inc., Lafayette, LA (United States)

    1997-02-01

    This paper presents an overview of issues related to handling NORM materials, and provides a description of a facility designed for the processing of NORM contaminated equipment. With regard to handling NORM materials the author discusses sources of NORM, problems, regulations and disposal options, potential hazards, safety equipment, and issues related to personnel protection. For the facility, the author discusses: description of the permanent facility; the operations of the facility; the license it has for handling specific radioactive material; operating and safety procedures; decontamination facilities on site; NORM waste processing capabilities; and offsite NORM services which are available.

  6. Workshop on environmental qualification of electric equipment

    International Nuclear Information System (INIS)

    Lofaro, R.; Gunther, W.; Villaran, M.; Lee, B.S.; Taylor, J.

    1994-05-01

    Questions concerning the Environmental Qualification (EQ) of electrical equipment used in commercial nuclear power plants have recently become the subject of significant interest to the US Nuclear Regulatory Commission (NRC). Initial questions centered on whether compliance with the EQ requirements for older plants were adequate to support plant operation beyond 40 years. After subsequent investigation, the NRC Staff concluded that questions related to the differences in EQ requirements between older and newer plants constitute a potential generic issue which should be evaluated for backfit, independent of license renewal activities. EQ testing of electric cables was performed by Sandia National Laboratories (SNL) under contract to the NRC in support of license renewal activities. Results showed that some of the environmentally qualified cables either failed or exhibited marginal insulation resistance after a simulated plant life of 20 years during accident simulation. This indicated that the EQ process for some electric cables may be non-conservative. These results raised questions regarding the EQ process including the bases for conclusions about the qualified life of components based upon artificial aging prior to testing

  7. Workshop on environmental qualification of electric equipment

    Energy Technology Data Exchange (ETDEWEB)

    Lofaro, R.; Gunther, W.; Villaran, M.; Lee, B.S.; Taylor, J. [comps.] [Brookhaven National Lab., Upton, NY (United States)

    1994-05-01

    Questions concerning the Environmental Qualification (EQ) of electrical equipment used in commercial nuclear power plants have recently become the subject of significant interest to the US Nuclear Regulatory Commission (NRC). Initial questions centered on whether compliance with the EQ requirements for older plants were adequate to support plant operation beyond 40 years. After subsequent investigation, the NRC Staff concluded that questions related to the differences in EQ requirements between older and newer plants constitute a potential generic issue which should be evaluated for backfit, independent of license renewal activities. EQ testing of electric cables was performed by Sandia National Laboratories (SNL) under contract to the NRC in support of license renewal activities. Results showed that some of the environmentally qualified cables either failed or exhibited marginal insulation resistance after a simulated plant life of 20 years during accident simulation. This indicated that the EQ process for some electric cables may be non-conservative. These results raised questions regarding the EQ process including the bases for conclusions about the qualified life of components based upon artificial aging prior to testing.

  8. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power license renewal in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. (author)

  9. Recent changes in UK legislation and the licensing of radiopharmacies

    Energy Technology Data Exchange (ETDEWEB)

    Monger, P N [Medicines Inspectorate, London (United Kingdom). Medicine Control Agency

    1992-06-01

    The implications of the recent loss of Crown Immunity to radiopharmacy in the NHS are reviewed. The options available are that the preparation of radiopharmaceuticals within a hospital will either be under the control of a pharmacist or be an activity licensed as 'Specials' manufacture. In the latter case requirements for inspection by the Medicines Control Agency, fees payable and the need for involvement of a pharmacist are reviewed. Requirements for the grant of a Specials Manufacturing Licence are presented in some detail. Reference is made to established and published sources of guidance, official and otherwise. Consideration is given to: staffing and personnel, open and closed procedures, environmental standards, handling of blood products, use of isolators, quality control and quality assurance, licensed and unlicensed materials, sterility testing, broth transfer tests, environmental monitoring and documentation. (author).

  10. 76 FR 11523 - Atomic Safety and Licensing Board; AREVA Enrichment Services, LLC (Eagle Rock Enrichment Facility...

    Science.gov (United States)

    2011-03-02

    ... and Licensing Board; AREVA Enrichment Services, LLC (Eagle Rock Enrichment Facility); Notice of... Governmental Entities Regarding Environmental Portion of Enrichment Facility Licensing Proceeding February 24.... White. In this 10 CFR part 70 proceeding regarding the request of applicant AREVA Enrichment Services...

  11. Environmental and process monitoring technologies

    International Nuclear Information System (INIS)

    Vo-Dinh, Tuan

    1993-01-01

    The objective of this conference was to provide a multidisciplinary forum dealing with state-of-the-art methods and instrumentation for environmental and process monitoring. In the last few years, important advances have been made in improving existing analytical methods and developing new techniques for trace detection of chemicals. These monitoring technologies are a topic of great interest for environmental and industrial control in a wide spectrum of areas. Sensitive detection, selective characterization, and cost-effective analysis are among the most important challenges facing monitoring technologies. This conference integrating interdisciplinary research and development was aimed to present the most recent advances and applications in the important areas of environmental and process monitoring. Separate abstracts have been prepared for 34 papers for inclusion in the appropriate data bases

  12. RECOGNITION DESIGN OF LICENSE PLATE AND CAR TYPE USING TESSERACT OCR AND EmguCV

    Directory of Open Access Journals (Sweden)

    Antonius Herusutopo

    2012-10-01

    Full Text Available The goal of the research is to design and implement software that can recognize license plates and car types from images. The method used for the research is soft computing using library of EmguCV. There are four phases in creating the software, i.e., input image process, pre-processing, training processing and recognition. Firstly, user enters the car image. Then, the program reads and does pre-processing the image from bitmap form into vector. The next process is training process, which is learning phase in order the system to be able recognize an object (in this case license plate and car type, and in the end is the recognition process itself. The result is data about the car types and the license plates that have been entered. Using simulation, this software successfully recognized license plate by 80.223% accurate and car type 75% accurate.Keywords: Image; Pre-Processing; License plate and Car Type Recognition, Training

  13. A new licensing strategy for Canadian mobile earth stations

    Science.gov (United States)

    Amero, Ronald G.

    1990-01-01

    Initiatives presently under consideration by the Department of Communications which will greatly simplify the licensing process for mobile earth stations are addressed. The current licensing approach is reviewed and the limitations of that system identified. A new approach is needed to respond to the needs of mobile satellite users in the 1990's and beyond, one which will have a minimal impact on the user while still respecting the legislative responsibilities of the department under the new Radiocommunication Act and the General Radio Regulations. The objective of this new strategy is to lead to a transparent licensing scheme for the end user, which in turn could lead to license exemption of blanket licenses as soon as possible.

  14. The changing shape of U.S. licensing philosophy

    International Nuclear Information System (INIS)

    Remick, F.J.

    1992-01-01

    The shape of U.S. nuclear licensing and regulatory philosophy and process has already changed. The new process requires NRC review and approval of the vendor designs before a prospective utility license applicant purchases the design and begins construction. The new philosophy has resulted from the lessons learned from extensive operating experience accumulated in the United States. New criteria established for judging reactor designs include the capability of future designs to be more tolerant of accidents beyond the traditional design basis events. Qualitative and quantitative goals have been chosen as a guide for allocating resources for regulation of the currently operating plants. The changing shape of nuclear licensing and regulatory philosophy is also a result of economic circumstances in the United States. All will have a better opportunity to take part in the process which is most likely to encourage further development of safe nuclear energy in the United States. (author)

  15. 'Culture and memory of the Sto. Antonio do Morro Grande/MG Quilombola community' program - case study: environmental licensing progress for the Rio de Janeiro-Belo Horizonte Gas Pipeline (GASBEL II)

    Energy Technology Data Exchange (ETDEWEB)

    Ismerio, Marcia [Pallos Environmental Consulting, Rio de Janeiro, RJ (United States); Bartolini, Marcia [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The 'Culture and Memory of the Sto. Antonio do Morro Grande Quilombola Community' Program was included in the environmental licensing process of the Rio de Janeiro-Minas Gerais gas pipeline ('GASBEL II'), as requested by the Palmares Cultural Foundation (Fundacao Cultural Palmares), which stipulates the elaboration and implementation of this program as a condition for obtaining the installation license. To develop the program and submit it to this institution, we used methodological procedures in the form of an anthropological social research, such as: interviews with the community's older or most active residents, and a preliminary recognition of the territory and the local culture; all in order to learn more about the community's history and current needs and to identify the remaining 'quilombolas' still living in the community. Analyzing the information raised the need for guided actions designed to rescue the community's cultural memory as an ethnic group and to contribute to its process of affirmation as a Traditional Rural 'Quilombola' Community. This led to the creation of the proposed 'Culture and Memory of the Sto. Antonio do Morro Grande Quilombola Community' Program, currently being developed for the Quilombola Community located in Ressaquinha, in the State of Minas Gerais. (author)

  16. Image simulation for automatic license plate recognition

    Science.gov (United States)

    Bala, Raja; Zhao, Yonghui; Burry, Aaron; Kozitsky, Vladimir; Fillion, Claude; Saunders, Craig; Rodríguez-Serrano, José

    2012-01-01

    Automatic license plate recognition (ALPR) is an important capability for traffic surveillance applications, including toll monitoring and detection of different types of traffic violations. ALPR is a multi-stage process comprising plate localization, character segmentation, optical character recognition (OCR), and identification of originating jurisdiction (i.e. state or province). Training of an ALPR system for a new jurisdiction typically involves gathering vast amounts of license plate images and associated ground truth data, followed by iterative tuning and optimization of the ALPR algorithms. The substantial time and effort required to train and optimize the ALPR system can result in excessive operational cost and overhead. In this paper we propose a framework to create an artificial set of license plate images for accelerated training and optimization of ALPR algorithms. The framework comprises two steps: the synthesis of license plate images according to the design and layout for a jurisdiction of interest; and the modeling of imaging transformations and distortions typically encountered in the image capture process. Distortion parameters are estimated by measurements of real plate images. The simulation methodology is successfully demonstrated for training of OCR.

  17. The problem of licensing and safety of nuclear power plants

    International Nuclear Information System (INIS)

    Silva, R.A. da.

    1987-01-01

    The historical evolution of licensing process of nuclear power plants is presented. The designs carried out by FURNAS for constructing Angra-1 reactor and its contribution to the Brazilian CNEN in de licensing process, are evaluated. The aims of FURNAS Research Programs are determined and the safety goals are established. (M.C.K.) [pt

  18. Federal environmental assessment panel process

    International Nuclear Information System (INIS)

    Edwards, R.A.; King, J.M.

    1996-01-01

    The Government of Canada inaugurated an environmental assessment process in 1973. Since that time, the Department of Natural Resources, or its predecessor, the Department of Energy Mines and Resources, and industrial clients of the Department, have been major participants in the process. In 1995, the authors interviewed representatives of a number of client industries and selected individuals, to ask their opinion of the public hearing part of the environmental assessment process, with the objective of identifying shortcomings and proposing improvements. Respondents criticized the hearings as costly, time-wasting, bureaucratic, and uncertain in cost, time, and outcome. A number of observations on noted areas of shortcoming are presented in this paper, with suggestions for improvement

  19. Federal environmental assessment panel process

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, R A; King, J M [Natural Resources Canada, Ottawa, ON (Canada)

    1997-12-31

    The Government of Canada inaugurated an environmental assessment process in 1973. Since that time, the Department of Natural Resources, or its predecessor, the Department of Energy Mines and Resources, and industrial clients of the Department, have been major participants in the process. In 1995, the authors interviewed representatives of a number of client industries and selected individuals, to ask their opinion of the public hearing part of the environmental assessment process, with the objective of identifying shortcomings and proposing improvements. Respondents criticized the hearings as costly, time-wasting, bureaucratic, and uncertain in cost, time, and outcome. A number of observations on noted areas of shortcoming are presented in this paper, with suggestions for improvement.

  20. Licensing activities for advanced reactors in NNC

    International Nuclear Information System (INIS)

    Chevalier, A.B.H.; Mustoe, J.; Walters, J.; Ingham, E.L.

    2001-01-01

    NNC has been involved in safety and licensing activities for advanced reactors for many years. Most recently NNC has been involved with national regulators or their representatives for the HTR (High Temperature Reactor) reactor and the possible siting of ITER (International Thermonuclear Experimental Reactor) within Europe. Commonalties between the two activities can be seen, even though one is a fission process and the other based on a completely new technology. Both have the potential to generate power at a very low overall exposure to the public and station staff, but both also need to demonstrate to the regulator the safety of a design which differs from the standard LWR practice. In both concepts passive design features provide a major part of the safety argument, but the detailed assessment and justification of these features in licensing terms still needs to be made. A number of critical safety issues can be identified, which generally apply to any advanced system. These are: Safety categorization, codes and standards; confinement or containment; ALARA; safety code modelling and data; Occupational Exposure; occupational exposures; decommissioning and waste; no evacuation, or no emergency plans. The UK is notable for a flexible licensing regime, which allows a safety case to be built up from first principles, where this is applicable. In addition, experience of licensing gas cooled, water cooled and liquid metal plant, as well as extensive experience outside the UK provides NNC with a unique insight into the different licensing methodologies which can be applied in the licensing process. This paper discusses some possible approaches which could be applied in order to satisfy regulatory demands when addressing the critical issues listed above. (author)

  1. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    International Nuclear Information System (INIS)

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  2. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience.

  3. Composable Data Processing in Environmental Science - A Process View

    NARCIS (Netherlands)

    Wombacher, Andreas

    Data processing in environmental science is essential for doing science. The heterogeneity of data sources, data processing operations and infrastructures results in a lot of manual data and process integration work done by each scientist individually. This is very inefficient and time consuming.

  4. Licensing decisions and safety research related to LMFBR accidents

    International Nuclear Information System (INIS)

    Denise, R.P.; Speis, T.P.; Kelber, C.N.; Curtis, R.T.

    1977-01-01

    The licensing approach which ensures adequate protection of the public health and safety against serious accidents is described. This paper describes the role of core melt and core disruptive accidents in the design, safety research, and licensing processes, using the Clinch River Breeder Reactor (CRBR) as a focal point. Major design attention is placed on the prevention of these accidents so that the probability of core melt accidents is reduced to a sufficiently low level that they are not treated as design basis accidents. Additional requirements are placed upon the design to further reduce residual risk. This licensing process is supported by a confirmatory research program designed to provide an independent basis for licensing judgements. It has as a goal the resolution of generic safety issues prior to the establishment of a commercial LMFBR industry. The program includes accident analysis, experiments in materials interactions, aerosol transport and system integrity and planning for new safety test facilities. The problems are approached in a multi-disciplinary functional manner that identifies key safety issues and centralizes efforts to resolve them. The near term objectives of the program support the licensing of the Clinch River Breeder Reactor (CRBR) and the proposed Prototype Large Breeder Reactor (PLBR). The long term objectives of the program support the licensing of commercial LMFBRs during the late 1980's and beyond. This safety research is designed to provide an independent basis for the licensing judgements which must be made by the Nuclear Regulatory Commission

  5. Essays on the economics of licensing nuclear power plants

    International Nuclear Information System (INIS)

    Cohen, L.R.

    1979-01-01

    Regulation and licensing of nuclear power plants by the United States Atomic Energy Commission and the United States Nuclear Regulatory Commission are discussed. Chapter 1 overviews the licensing process and issues raised in licensing cases. Based on a sample of plants licensed between 1967 and 1978, a statistical study of the impact of public participation in licensing is performed. The study concludes that public participation has had a major impact on licensing and power-plant costs. The impact is due to a fundamental weakness of the Commissions: their inability to resolve certain issues related to acceptable social risk. The study has important policy implications for reforming the Federal licensing process. Chapter 2 contains an analysis of the Price-Anderson Act, a Federal program for compensating victims of large nuclear accidents. The Price-Anderson Act is placed within the context of generalized federal disaster relief. A model is developed that allows an evaluation programs on the basis of moral hazard and equity principles. Chapter 3 analyzes the Nuclear Regulatory Commission's treatment of its mandatory antitrust review of applicants for nuclear power plants. The main conclusion of the chapter is that the reviews have not addressed the central economic issues of antitrust that are relevant to nuclear power. Instead, the reviews contribute to further cartelization of the electric utility industry. While politically expedient, the reviews are counter-productive to the development of an optimal industry structure

  6. Licensing of the OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.

    2007-01-01

    This paper presents a description of the licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) OPAL reactor. It addresses the Construction Licence, the interface between ANSTO, INVAP (the contractor with responsibility for design and construction of the facility) and the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA, the Australian nuclear regulator) during the construction of OPAL, specific licensing issues that have arisen during the construction and commissioning process, and the Operating Licence Application. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators

  7. Draft environmental statement related to the Union Carbide Corporation, Gas Hills Uranium Project (Natrona County, Wyoming)

    International Nuclear Information System (INIS)

    1979-01-01

    The proposed action is the renewal of Source Material License SUA-648 issued for the operation of the Gas Hills Uranium Project in Wyoming, near Moneta. The project is an acid leach, ion-exchange, and solvent-extraction uranium ore processing mill at an increased capacity of 500,000 tons per year and the construction of two heap leach facilities in Natrona and Fremont Counties for initial processing of low-grade ore. After analysis of environmental impacts and adverse effects, it is the proposed position of NRC that the license be renewed subject to conditions relating to stabilization of the tailings, reclamation, environmental monitoring, evaluation of any future activity not evaluated by NRC, archeological survey, analysis of unexpected harmful effects, and decommissioning

  8. The HOR core conversion program development and licensing experiences

    International Nuclear Information System (INIS)

    Vries, J.W. de; Gibcus, H.P.M.; Leege, P.F.A. de

    1997-01-01

    This paper deals with the experiences in the development of a fuel conversion program for a 2 MW university type research reactor, the HOR. It gives an overview of the technical and administrative aspects concerning the fuel conversion program development since the eighties, including the safety review and licensing process. The overall final safety report was submitted in 1995, together with the environmental impact report, and a licence application was submitted accordingly. The licence permitting the conversion was issued in 1996, coming into force at the beginning of this year, although an appeal case is still pending. At the moment the necessary preparations for starting the actual conversion of the HOR are made. The general program characteristics are addressed. (author)

  9. ABWR certification work brings US licensing stability nearer

    International Nuclear Information System (INIS)

    Wilkins, D.R.; Quirk, J.F.

    1991-01-01

    The Advanced Boiling Water Reactor (ABWR) is now approaching Final Design Approval by the US Nuclear Regulatory Commission (NRC) and will then proceed on to the certification phase of the NRC's new standard plant licensing process. Successful completion of this will usher in a new era of standardization and reactor licensing stability in the US. (author)

  10. AP1000{sup R} licensing and deployment in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.; Castiglione, L. L. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing

  11. Environmental Aspects, Objectives and Targets Identification Process

    International Nuclear Information System (INIS)

    Green, R.

    2002-01-01

    The purpose of this report is to document the environmental aspects and associated environmental impacts of the Bechtel SAIC Company (BSC) scope of work, evaluate the significance of those environmental aspects based on established criteria, and establish environmental objectives and targets for specific environmental aspects. This report is intended to be used by environmental staff in the evaluation of BSC work packages during the annual risk-based planning process. This report shall be fully reviewed and revised annually during the annual work planning process to reflect changes in BSC operations, facilities, and scope of work. Planned BSC work will be evaluated to determine if the work is covered by a previously defined activity, product or service (see Table 2); if work activities require redefinition or addition of a new activity; and if the significant evaluation for each environment aspect is still valid based on scope of planned work. New workscope initiated during the fiscal year through the Baseline Change Proposal process (i.e., not as part of the annual work plan) also will be reviewed for new environmental aspects and determination of whether the new workscope would change the significance rating of any environmental aspect. If a new environmental aspect is identified in a new work activity, product, or service but the aspect is not determined to be significant (see Section 4), then this report can be changed through an interim change notice (ICN). This report can be changed five times through an ICN before a full revision is required. However, if new workscope causes an environmental aspect to be graded as significant using the evaluation process in Section 4, this report shall be revised though a full review and revision

  12. HTR-PM Safety requirement and Licensing experience

    International Nuclear Information System (INIS)

    Li Fu; Zhang Zuoyi; Dong Yujie; Wu Zongxin; Sun Yuliang

    2014-01-01

    HTR-PM is a 200MWe modular pebble bed high temperature reactor demonstration plant which is being built in Shidao Bay, Weihai, Shandong, China. The main design parameters of HTR-PM were fixed in 2006, the basic design was completed in 2008. The review of Preliminary Safety Analysis Report (PSAR) of HTR-PM was started in April 2008, completed in September 2009. In general, HTR- PM design complies with the current safety requirement for nuclear power plant in China, no special standards are developed for modular HTR. Anyway, Chinese Nuclear Safety Authority, together with the designers, developed some dedicated design criteria for key systems and components and published the guideline for the review of safety analysis report of HTR-PM, based on the experiences from licensing of HTR-10 and new development of nuclear safety. The probabilistic safety goal for HTR-PM was also defined by the safety authority. The review of HTR-PM PSAR lasted for one and a half years, with 3 dialogues meetings and 8 topics meetings, with more than 2000 worksheets and answer sheets. The heavily discussed topics during the PSAR review process included: the requirement for the sub-atmospheric ventilation system, the utilization of PSA in design process, the scope of beyond design basis accidents, the requirement for the qualification of TRISO coating particle fuel, and etc. Because of the characteristics of first of a kind for the demonstration plant, the safety authority emphasized the requirement for the experiment and validation, the PSAR was licensed with certain licensing conditions. The whole licensing process was under control, and was re-evaluated again after Fukushima accident to be shown that the design of HTR-PM complies with current safety requirement. This is a good example for how to license a new reactor. (author)

  13. Need for improving the federal and state siting and licensing process

    International Nuclear Information System (INIS)

    Hartman, R.M.

    1976-01-01

    The environmental, health, and safety regulatory process has slowly evolved into a vast number of complex and uncoordinated institutional processes. These processes add unnecessary project costs, in addition to stifling and deterring government and industry from meeting their full responsibilities. The regulatory process is weighted down with inflexibility, staff bureaucracies, duplication of effort, and confusing court cases. The process has become so complex and bureaucratic that it appears incapable of being patched up or reformed from within. Thus, a whole new regulatory process, more integrated, simplified, and expeditious is needed

  14. Consolidated guidance about materials licenses: Program-specific guidance about portable gauge licenses. Final report; Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Vacca, P.C.; Whitten, J.E.; Pelchat, J.M.; Arredondo, S.A.; Matson, E.R.; Lewis, S.H.; Collins, D.J.; Santiago, P.A. [Nuclear Regulatory Commission, Washington, DC (United States). Div. of Industrial and Medical Nuclear Safety; Tingle, W. [Dept. of Environment, Health, and Natural Resources, Raleigh, NC (United States). Div. of Radiation Protection

    1997-05-01

    As part of its redesign of the materials licensing process, NRC is consolidating and updating numerous guidance documents into a single comprehensive repository as described in NUREG-1539 and draft NUREG-1541. NUREG-1556, Vol. 1, is the first program-specific guidance developed for the new process and will serve as a template for subsequent program-specific guidance. This document is intended for use by applicants, licensees, and NRC staff and will also be available to Agreement States. This document supersedes the guidance previously found in draft Regulatory Guide DG-0008, ``Applications for the Use of Sealed Sources in Portable Gauging Devices,`` and in NMSs Policy and guidance Directive 2-07, ``Standard Review Plan for Applications for Use of Sealed Sources in Portable Gauging Devices.`` This final report takes a more risk-informed, performance-based approach to licensing portable gauges, and reduces the information(amount and level of detail) needed to support an application to use these devices. It incorporates many suggests submitted during the comment period on draft NUREG-1556, Volume 1. When published, this final report should be used in preparing portable gauge license applications. NRC staff will use this final report in reviewing these applications.

  15. Consolidated guidance about materials licenses: Program-specific guidance about portable gauge licenses. Final report; Volume 1

    International Nuclear Information System (INIS)

    Vacca, P.C.; Whitten, J.E.; Pelchat, J.M.; Arredondo, S.A.; Matson, E.R.; Lewis, S.H.; Collins, D.J.; Santiago, P.A.; Tingle, W.

    1997-05-01

    As part of its redesign of the materials licensing process, NRC is consolidating and updating numerous guidance documents into a single comprehensive repository as described in NUREG-1539 and draft NUREG-1541. NUREG-1556, Vol. 1, is the first program-specific guidance developed for the new process and will serve as a template for subsequent program-specific guidance. This document is intended for use by applicants, licensees, and NRC staff and will also be available to Agreement States. This document supersedes the guidance previously found in draft Regulatory Guide DG-0008, ''Applications for the Use of Sealed Sources in Portable Gauging Devices,'' and in NMSs Policy and guidance Directive 2-07, ''Standard Review Plan for Applications for Use of Sealed Sources in Portable Gauging Devices.'' This final report takes a more risk-informed, performance-based approach to licensing portable gauges, and reduces the information(amount and level of detail) needed to support an application to use these devices. It incorporates many suggests submitted during the comment period on draft NUREG-1556, Volume 1. When published, this final report should be used in preparing portable gauge license applications. NRC staff will use this final report in reviewing these applications

  16. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal (LR) for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power LR in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. The reactor LRGDs referenced in this poster can all be accessed at http://www.nrc.gov/reactors/operating/licensing/renewal/guidance.html (author)

  17. To License or Not to License Remanufacturing Business?

    Directory of Open Access Journals (Sweden)

    Zu-Jun Ma

    2018-01-01

    Full Text Available Many original equipment manufacturers (OEMs face the choice of whether to license an independent remanufacturer (IR to remanufacture their used products. In this paper, we develop closed-loop supply chain models with licensed and unlicensed remanufacturing operations to analyze the competition and cooperation between an OEM and an IR. The OEM sells new products and collects used products through trade-ins, while the IR intercepts the OEM’s cores to produce remanufactured products and sell them in the same market. We derive optimal decisions for each of the two types of firms in licensed and unlicensed remanufacturing scenarios and identify conditions under which the OEM and the IR would be most likely to cooperate with each other in implementing remanufacturing. The results show although it is beneficial for an OEM to license an IR to remanufacture its cores, it is not always necessary for an IR to accept OEM’s authorization. Moreover, we contrast the result for licensed remanufacturing scenario in the decentralized system with that in the centrally coordinated system to quantify potential inefficiency resulting from decentralization of decision making.

  18. Technology licensing in China

    DEFF Research Database (Denmark)

    Wang, Yuandi; Li-Ying, Jason; Chen, Jin

    2015-01-01

    We explore the landscape of technology licensing among Chinese entities in the period 2000–12, using a unique database on technological licensing from the State Intellectual Property Office of China. We find that: first, among Chinese licensee organizations, firms have dominated in terms...... of the number of licensed technologies; second, the geographical distribution of licensed technologies among the provinces has gradually reached a new quantitative balance; third, utility models are the most popular technologies to be licensed and the majority of technology licensing in China has been between...... Chinese entities, and most transactions have been local within provinces; and finally, Chinese firms have gradually in-licensed newer and newer technologies, but the technologies in-licensed from foreign sources are by no means state-of-the-art. We make several suggestions for innovation policy...

  19. The strategy of experimental power reactor licensing in Indonesia

    International Nuclear Information System (INIS)

    Moch Djoko Birmano

    2015-01-01

    Currently, BATAN has being planned to develop Experimental Power Reactor (EPR), that is the research nuclear reactor that can generate power (electricity or heat). The EPR is planned will be built in the National Center for Research of Science and Technology (Puspiptek) area at Serpong, South Tangerang, Banten Province, with the choice of reactor types is HTGR with the power size of 10 MWth. As stated in the Act No. 10 year 1997 on Nuclear Power, that every construction and operation of nuclear reactors and other nuclear installations and decommissioning of nuclear reactors required to have a permit. Furthermore, the its implementation arrangements is regulated in Government Regulation (GR) No. 2 year 2014 on Licensing of Nuclear Installations and Nuclear Material Utilization, which contains the requirements and procedures for the licensing process since site, construction, commissioning, operation, and decommissioning, it means licensing is implemented during the activity of construction, operation and decommissioning of NPPs.While, for the more detailed licensing arrangements available in the guidelines of BAPETEN Chairman Regulation (BCR). This study was conducted to understand the legal and institutional aspects, types and stages, and the licensing process of RDE, and identify licensing strategy so that timely as planned. Methodologies used include the literature study, consultation with experts in BAPETEN, discussions in the national seminar including FGD. (author)

  20. Effects of Californian PRC 25500 on nuclear power plant licensing

    International Nuclear Information System (INIS)

    Hahn, F.J.

    1976-01-01

    The California Public Resources Code 25500 established the Energy Resources Conservation and Development Commission on January 7, 1976. This Act mandated that the Commission process applications for new power plants within very specific timeframes. The paper presents the intent and timing of the two-phase licensing procedure and illustrates the effect of this procedure on power plants already into the NRC licensing process and on power plants which are in the beginning of the site selection process

  1. Licensing of the Ignalina NPP

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    Since 1991 State Nuclear Power Safety Inspectorate (VATESI) has regulated Ignalina NPP operation by issuing annual operating permits. Those have been issued following submission of specified documents by the Ignalina NPP that have been reviewed by VATESI. However, according to to the procedures that are now established in the Law on Nuclear Energy and subordinate regulations the use of nuclear energy in the Republic of Lithuania is subject to strict licensing. Therefore a decision about the licence for continued operation of unit 1 should be taken. Licence would be granted by VATESI in cooperation with the Ministry of Health, Ministry of Environment and the institutions of local authorities. Ignalina NPP presented to the VATESI safety analysis report (SAR) with other documents. SAR was made mainly by foreign experts and financed by European Bank for Reconstruction and Development (EBRD). VATESI in this process is supported by western regulators. A special project LAP - Licensing Assistance Project was launched to help VATESI perform licensing according western practices

  2. Future of Nuclear Power: NRC emergency preparedness licensing activities agenda

    International Nuclear Information System (INIS)

    Essig, T.H.

    1995-01-01

    This talk summary addresses the issue of how future policies of the NRC will affect nuclear power in areas such as construction, emergency preparedness, and licensing. Specific topics covered include the following: Emergent EP licensing issues for operating nuclear Power Plants; 10CFR Part 52 and the process for licensing of Advanced Light Water Reactors (ALWRs); and potential revisions to emergency preparedness programs for future nuclear power plants

  3. Color, Scale, and Rotation Independent Multiple License Plates Detection in Videos and Still Images

    Directory of Open Access Journals (Sweden)

    Narasimha Reddy Soora

    2016-01-01

    Full Text Available Most of the existing license plate (LP detection systems have shown significant development in the processing of the images, with restrictions related to environmental conditions and plate variations. With increased mobility and internationalization, there is a need to develop a universal LP detection system, which can handle multiple LPs of many countries and any vehicle, in an open environment and all weather conditions, having different plate variations. This paper presents a novel LP detection method using different clustering techniques based on geometrical properties of the LP characters and proposed a new character extraction method, for noisy/missed character components of the LP due to the presence of noise between LP characters and LP border. The proposed method detects multiple LPs from an input image or video, having different plate variations, under different environmental and weather conditions because of the geometrical properties of the set of characters in the LP. The proposed method is tested using standard media-lab and Application Oriented License Plate (AOLP benchmark LP recognition databases and achieved the success rates of 97.3% and 93.7%, respectively. Results clearly indicate that the proposed approach is comparable to the previously published papers, which evaluated their performance on publicly available benchmark LP databases.

  4. A Real-time License Plate Detection System for Parking Access

    Directory of Open Access Journals (Sweden)

    Roenadi Koesdijarto

    2010-08-01

    Full Text Available The automatic and real-time license plate detection system can be used as an access control entry of vehicles into the parking area. The problem is how to recognize the vehicles that will go into the parking lot and how to recognize various types of license plates in various light conditions quickly and accurately. In this research, the prototype was developed with a detection system to recognize the vehicles that will enter the parking area, and a license plate recognition system. In the license plate recognition system, the Fourier transform and Hidden Markov model method have proposed to detect location of license plate and as characters segmentation to recognize Indonesia license plates. The research results have shown that the developed prototype system has successfully recognized all Indonesia license plates in several of light condition and camera position. The percentage of plate recognition in the real-time experiment is 84.38%, and the average execution time for all recognition process is 5.834 second.

  5. State environmental review of a proposed utility independent spent fuel storage installation

    International Nuclear Information System (INIS)

    Sabel, G.; Halstead, R.

    1991-01-01

    This paper describes the environmental review process which was applied by the State of Minnesota to a proposed dry cask storage facility. An environmental analysis of the proposed project is summarized, as are alternatives including other dry storage technologies, increased in-pool storage, transhipment, reprocessing, use of higher burnup fuel and conservation. Public comments and concerns included potential cask failures, health impacts, and the possibility of the site becoming a open-quotes permanentclose quotes storage facility. State intervention in the federal license process is also described

  6. Nebraska withdraws its intent to deny site license

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The state of Nebraska has withdrawn its notice of intent to deny the US Ecology (USE) license application for the proposed low-level radioactive waste disposal site in Boyd County, near Butte, Neb. On October 4, after review of USE's August 27 submittal of a revision to the boundaries of the proposed site, a letter from the state's Department of Health (DOH) and Department of Environmental Quality (DEQ) to John. H. DeOld, the USE project manager for the Central Interstate Compact's proposed LLW site, noted that open-quotes...we are hereby withdrawing the Notice of Intent to Deny License as a moot, and will conduct a substantive review of the reconfigured site for compliance with the applicable regulations.close quotes

  7. Final Environmental Statement related to license renewal and power increase for the National Bureau of Standards Reactor: Docket No. 50-184

    International Nuclear Information System (INIS)

    1982-08-01

    This Final Environmental Statement contains an assessment of the environmental impact associated with renewal of Operating License No. TR-5 for the National Bureau of Standards (NBS) reactor for a period of 20 years at a power level of 20 MW. This reactor is located on the 576-acre NBS site near Gaithersburg in Montgomery County, Maryland, about 20 mi northwest of the center of Washington, DC. The reactor is a high-flux heavy-water-moderated, cooled and reflected test reactor, which first went critical on December 7, 1967. Though the reactor was originally designed for 20-MW operation, it has been operating for 14 years at a maximum authorized power level to 10 MW. Program demand is now great enough to warrant operation at a power level of 20 MW. No additional major changes to the physical plant are required to operate at 20 MW

  8. 10 CFR 32.26 - Gas and aerosol detectors containing byproduct material: Requirements for license to manufacture...

    Science.gov (United States)

    2010-01-01

    ...: Requirements for license to manufacture, process, produce, or initially transfer. 32.26 Section 32.26 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES TO MANUFACTURE OR TRANSFER CERTAIN ITEMS... byproduct material: Requirements for license to manufacture, process, produce, or initially transfer. An...

  9. Licensing Strategies of the Entreprising - But Vulnerable - `Intellectual property' Vendors

    DEFF Research Database (Denmark)

    Davis, Lee N.

    This paper investigates in an exploratory manner the licensing strategies pursued by firms whose business model is based on developing and licensing out their intellectual property rights (IPRs). These are not traditional suppliers, since they do not engage in production or commercialization...... be differentiated along two main dimensions: whether the driving force behind the inventive process is "technology push" or "market pull", and the degree to which the innovative activities carried out by the IP vendor are mutually dependent upon the innovative activities of the other relevant market players....... On this basis, four main licensing strategies are identified. We investigate the relative benefits and costs of these four strategies, and the factors affecting licensing choices.Key words: Intellectual property, licensing, strategyJEL Codes: O31, OO34...

  10. Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective

    International Nuclear Information System (INIS)

    Watson, B.A.; Buckley, J.T.; Craig, C.M.

    2006-01-01

    Trojan Nuclear Plant (Trojan) and Maine Yankee Nuclear Plant (Maine Yankee) were the first two power reactors to complete decommissioning under the U. S. Nuclear Regulatory Commission's (NRC's) License Termination Rule (LTR), 10 CFR Part 20, Subpart E. The respective owners' decisions to decommission the sites resulted in different approaches to both the physical aspects of the decommissioning, and the approach for obtaining approval for completing the decommissioning in accordance with regulations. Being in different States, the two single-unit pressurized water reactor sites had different State requirements and levels of public interest that impacted the decommissioning approaches. This resulted in significant differences in decommissioning planning, conduct of decommissioning operations, volumes of low- level radioactive waste disposed, and the final status survey (FSS) program. While both licensees have Independent Spent Fuel Storage Installations (ISFSIs), Trojan obtained a separate license for the ISFSI in accordance with the requirements of 10 CFR Part 72 and terminated their 10 CFR Part 50 license. Maine Yankee elected to obtain a general license under 10 CFR Part 50 for the ISFSI and reduce the physical site footprint to the ISFSI through a series of license amendments. While the NRC regulations are flexible and allow different approaches to ISFSI licensing there are separate licensing requirements that must be addressed. In 10 CFR 50.82, the NRC mandates public participation in the decommissioning process. For Maine Yankee, public input resulted in the licensee entering into an agreement with a concerned citizen group and resulted in State legislation that significantly lowered the dose limit below the NRC radiological criteria of 25 mrem (0.25 mSv) per year (yr) in 10 CFR 20.1402 for unrestricted use. The lowering of the radiological criteria resulted in a significant dose modeling effort using site-specific Derived Concentrations Guideline Levels (DCGLs

  11. ENVIRONMENTAL LICENSING PROCESS IN INDUSTRIAL MINING PROJECT

    Directory of Open Access Journals (Sweden)

    Priscilla Meireles de Oliveira

    2017-11-01

    Full Text Available Os projetos de mineraçao geralmente apresentam certa complexidade, e com frequencia tem problemas de desempenho associados ao aumento de prazos para entrada em operaçao. Nesse sentido, um dos grandes gargalos, considerados caminho crítico nos cronogramas de projetos de mineraçao, é o licenciamento ambiental. Os processos de licenciamento ambiental tem se tornado cada vez mais rigorosos, com órgaos responsáveis mais exigentes, o que tem demandado um prazo significativo nos cronogramas dos projetos, acarretando muitas vezes impactos consideráveis na implantaçao dos empreendimentos. Nesse contexto, este trabalho apresenta um estudo exploratório realizado no estado de Minas Gerais, com o objetivo de fazer um levantamento da dimensao dos atrasos em licenciamentos ambientais e das suas causas. Dessa forma, pode contribuir para que, em futuros trabalhos, sejam propostas diretrizes para modificaçao dos processos de licenciamento, no âmbito da concepçao e desenvolvimento dos empreendimentos. O estudo exploratório teve como base de análise os documentos constantes em 355 processos de licenciamento ambiental de quatorze empresas de mineraçao, formalizados no órgao licenciador mineiro. Foi constatado que um número substancial de empreendimentos tem prazos para a obtençao de licenças bem superiores aos previstos na legislaçao ambiental, impactando os cronogramas dos projetos. Constatouse, também, a alta incidencia de solicitaçao de informaçoes complementares por parte do órgao competente. Parte significativa dessas solicitaçoes é decorrente de falhas na caracterizaçao dos empreendimentos e das soluçoes de engenharia, bem como da falta de maturidade na análise do impacto ambiental e suas medidas mitigadoras. O trabalho é relevante na medida em que o conhecimento dos prazos praticados e das causas de atraso na obtençao de licenças ambientais permite aos empreendedores o estabelecimento de cronogramas mais realistas para a concessao das licenças, bem como o direcionamento de açoes no sentido de evitar que estas solicitaçoes ocorram, antevendo riscos e contribuindo para agilizar a análise dos processos de licenciamento.

  12. Licensing systems and inspection of nuclear installations in NEA Member countries. Part 1, Description of licensing systems

    International Nuclear Information System (INIS)

    1977-01-01

    This study provides an assessment of the legislative and regulatory provisions applicable and of the practices followed in the countries concerned and is divided into two separate sections. This document is the first part only. It contains the description of national licensing and inspection systems for nuclear installations in the twenty OECD countries which have specific regulations in this field. Each analysis has been presented following a plan which is as standardised as possible so as to facilitate comparison between the national systems. Part II, which is not included in this document, contains the diagrams illustrating the steps in the licensing procedure and the duties of the bodies involved as well as certain additional documents. It also includes a table showing the sequence of the main steps in the licensing process in the countries covered by this Study

  13. Status of the Monticello nuclear generating plant lead plant license renewal program

    International Nuclear Information System (INIS)

    Pickens, T.A.

    1992-01-01

    In 1988, the Monticello nuclear generating plant was chosen by the US Department of Energy through Sandia National Laboratories and the Electric Power Research Institute to serve as the lead boiling water reactor in the lead plant license renewal program. The purpose of the lead plant license renewal program is to provide insights during the development of and to demonstrate the license renewal regulatory process with the US Nuclear Regulatory Commission (NRC). The work being performed in three phases: (1) preparation of the technical basis for license renewal; (2) development of the technical basis into a formal license renewal application; and (3) review of the application by the NRC. This paper discusses the systems and structures identified as important to license renewal in accordance with 10CFR54 as well as the plant documents and programs that were used in going through the identification process. The systems and structures important to license renewal will then provide insights into how structures and components were identified that are required to be evaluated for aging, the elements of the aging evaluations, and the effective programs used to manage potentially significant aging

  14. The use of U.S. NRC licensing practices for VVERs

    International Nuclear Information System (INIS)

    Popp, D.M.

    2000-01-01

    The licensing process for the upgraded Temelin I and C and Fuel designs were enhanced with the introduction of U.S. Nuclear Regulatory Commission, NRC practices. Specifically, the use of the NRC Regulatory Guide 1.70, 'Standard Format and Content Guide for Safety Analyses Reports' and NRC NUREG 0800, 'Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants', were beneficial in the development and review of Temelin licensing documentation. These standards have been used for the preparation and review of Safety Analysis Reports in the United States and also in a large number of licensing applications around the world. Both Regulatory Guide 1.70 and NUREG 0800 were developed to provide a predictable and structured approach to licensing. This paper discusses this approach and identifies the benefits to designers, writers of licensing documentation and reviewers of licensing documents. (author)

  15. Development of radioactive waste management licensing review assistant

    International Nuclear Information System (INIS)

    Wei-Whua Loa; Suan Chen; Wei-Chu Yu

    1992-01-01

    Regulations on radioactive waste disposal are now in urgent need due to our increasing consumption of electric power from nuclear origin. It is set forth that actually applying the regulations to evaluate the license application of new repositories for interim storage and final disposal of High-Level Waste and Low-Level Waste before the year of 2000. In the mean time, it is expected to establish the basis for the decision on issuing the license. The license review procedure can be very complicated, because too many factors must be taken into consideration. For the time being, licensing review is as much an art as it is a science. The authority usually faces three major problems; (1) the availability of domain expert, (2) maintaining of high quality and consistent reviews, and (3) the documentation of the review process. However, to maintain a more efficient, accurate, and systematic review procedure, and at the same time to reduce costs, the Artificial Intelligence (AI) techniques may be used. An expert system is designed as a radioactive waste management licensing review aid for the staff those are in charge of the license application. Tasks such as completeness checking, functional areas of review distribution, participation confirmation, knowledge acquisition, review comment collection, weighting calculation, and degree of satisfaction are considered. In this paper we will discuss the development of the radioactive waste management licensing review assistant

  16. Process benchmarking for improvement of environmental restoration activities

    International Nuclear Information System (INIS)

    Celorie, J.A.; Selman, J.R.; Larson, N.B.

    1995-01-01

    A process benchmarking study was initiated by the Office of Environmental Management (EM) of the US Department of Energy (DOE) to analyze and improve the department's environmental assessment and environmental restoration (ER) processes. The purpose of this study was to identify specific differences in the processes and implementation procedures used at comparable remediation sites to determine best practices which had the greatest potential to minimize the cost and time required to conduct remedial investigation/ feasibility study (RI/FS) activities. Technical criteria were identified and used to select four DOE, two Department of Defense (DOD), and two Environmental Protection Agency (EPA) restoration sites that exhibited comparable characteristics and regulatory environments. By comparing the process elements and activities executed at the different sites for similar endpoints, best practices were identified for streamlining process elements and minimizing non-value-added activities. Critical measures that influenced process performance were identified and characterized for the sites. This benchmarking study focused on two processes and the internal/external review of documents and the development of the initial evaluation and data collection plan (IEDCP)--since these had a great potential for savings, a high impact on other processes, and a high probability for implementation

  17. Validation, acceptance and licensing

    International Nuclear Information System (INIS)

    Wene, C.O.

    1992-01-01

    The licensing process requires communication of complex scientific and technical information. In this paper transfer of such information is discussed using concepts and ideas from systems analysis, cybernetics and argumentation theory. A simple model for the decision process is developed. The analysis stresses the need for careful design of the communication channels between the three systems involved: the political system, the judicial-regulatory system and the scientific-technical community. The Dialogue - Scenario project initiated by the Swedish nuclear Inspectorate is briefly presented

  18. Environmental process improvement feasibility study and demonstration program

    Science.gov (United States)

    Martin, Rodger L.

    1994-01-01

    This report is the final product of an environmental study conducted by Western Commercial Space Center, Inc. under contract to Tennessee-Calspan Center for Space Transportation and Applied Research. The purpose of this investigation is to accurately document the current environmental and permitting processes associated with commercial space launch activity at Vandenberg AFB, and make recommendations to streamline those processes. The particular areas of interest focus on: identifying applicable Federal, state, and local laws, Department of Defense directives, and Air force regulations; defining the environmental process on Vandenberg AFB and how it relates with other agencies, including Federal and state regulatory agencies; and defining the air quality permit process. Study investigation results are applied to an example Pilot Space Launch Vehicle (PSLV) planning to launch from Vandenberg AFB. The PSLV space hardware is analyzed with respect to environmental and permitting issues associated with vehicle processing, facilities required (existing or new), and launch. The PSLV verified the earlier findings of the study and gave insight into streamlining recommendations.

  19. Review of the Brazilian experience in the licensing of nuclear power plants

    International Nuclear Information System (INIS)

    Lederman, L.; Laborne, J.J.

    1983-01-01

    Survey of the licensing of the Brazilian Nuclear Power Plants (NPPs) is presented. The organization and technical expertise of the Comissao Nacional de Energia Nuclear, the Brazilian Regulatory Body, is reviewed with regard to in-house experience, foreign consultants, agreements with regulatory bodies of other countries and research contracts with Brazilian univerisities. The application of the two-stage licensing process and the stage of development of Brazilian nuclear standards is described. Finally, the paper speculates about the future role of probabilistic risk assessment in the Brazilian licensing process

  20. A quantitative integrated assessment of pollution prevention achieved by integrated pollution prevention control licensing.

    Science.gov (United States)

    Styles, David; O'Brien, Kieran; Jones, Michael B

    2009-11-01

    This paper presents an innovative, quantitative assessment of pollution avoidance attributable to environmental regulation enforced through integrated licensing, using Ireland's pharmaceutical-manufacturing sector as a case study. Emissions data reported by pharmaceutical installations were aggregated into a pollution trend using an Environmental Emissions Index (EEI) based on Lifecycle Assessment methodologies. Complete sectoral emissions data from 2001 to 2007 were extrapolated back to 1995, based on available data. Production volume data were used to derive a sectoral production index, and determine 'no-improvement' emission trends, whilst questionnaire responses from 20 industry representatives were used to quantify the contribution of integrated licensing to emission avoidance relative to these trends. Between 2001 and 2007, there was a 40% absolute reduction in direct pollution from 27 core installations, and 45% pollution avoidance relative to hypothetical 'no-improvement' pollution. It was estimated that environmental regulation avoided 20% of 'no-improvement' pollution, in addition to 25% avoidance under business-as-usual. For specific emissions, avoidance ranged from 14% and 30 kt a(-1) for CO(2) to 88% and 598 t a(-1) for SO(x). Between 1995 and 2007, there was a 59% absolute reduction in direct pollution, and 76% pollution avoidance. Pollution avoidance was dominated by reductions in emissions of VOCs, SO(x) and NO(x) to air, and emissions of heavy metals to water. Pollution avoidance of 35% was attributed to integrated licensing, ranging from between 8% and 2.9 t a(-1) for phosphorus emissions to water to 49% and 3143 t a(-1) for SO(x) emissions to air. Environmental regulation enforced through integrated licensing has been the major driver of substantial pollution avoidance achieved by Ireland's pharmaceutical sector - through emission limit values associated with Best Available Techniques, emissions monitoring and reporting requirements, and

  1. Reactor licensing

    International Nuclear Information System (INIS)

    Harvie, J.D.

    2002-01-01

    This presentation discusses reactor licensing and includes the legislative basis for licensing, other relevant legislation , the purpose of the Nuclear Safety and Control Act, important regulations, regulatory document, policies, and standards. It also discusses the role of the CNSC, its mandate and safety philosophy

  2. Large-scale projects between regional planning and environmental protection

    International Nuclear Information System (INIS)

    Schmidt, G.

    1984-01-01

    The first part of the work discusses the current law of land-use planning, municipal and technical construction planning, and licensing under the atomic energy law and the federal law on immission protection. In the second part some theses suggesting modifications are submitted. In the sector of land-use planning substantial contributions to the protection of the environment can only be expected from programs and plans (aims). For the environmental conflicts likely to arise from large-scale projects (nuclear power plant, fossil-fuel power plant) this holds good for the most part of site selection plans. They have bearings on environmental protection in that they presuppose thorough examination of facts, help to recognize possible conflicts at an early date and provide a frame for solving those problems. Municipal construction planning is guided by the following principles: Environmental protection is an equivalent planning target. Environmental data and facts and their methodical processing play a fundamental part as they constitute the basis of evaluation. Under the rules and regulations of the federal law on immission protection, section 5, number 2 - prevention of nuisances - operators are obliged to take preventive care of risks. That section is not concerned with planning or distribution. Neither does the licensing of nuclear plants have planning character. So far as the legal preconditions of licensing are fulfilled, the scope for rejection of an application under section 7, subsection 2 of the atomic energy law in view of site selection and requirement of a plant hardly carries any practical weight. (orig./HP) [de

  3. Ignalina plant licensing process, international co-operation and assistance

    International Nuclear Information System (INIS)

    Bystedt, P.

    1999-01-01

    The challenge for Lithuania as a country with regained independence was to perform a licensing review in a way never done before in the country and in a time schedule that was extremely short. The work included establishing of the licensing base, strengthening the regulatory authority and organising the technical support, establish and implement a safety improvement program, production of the safety case and review of the safety case, and to derive a conclusion regarding whether to issue a licence or not. This was to be done together with other tasks, such as implementation of modifications included in the safety improvement programme at Ignalina, implementation of a new storage for spent fuel and, most important of all, to manage the operational safety at the plant. The achievements are impressive seen in view of the point of start and in view of the time and resources that have been available. Lithuania has put forward a unique safety documentation of an RBMK reactor and presented an in-depth safety evaluation in full openness to Western experts, giving the unique possibility to compare the safety of the Ignalina reactors to Western standards. The co-operation that has been established between Lithuania and Western experts through different assistance programmes is of outmost value, for all involved parties. Co-operation should continue as one element of the challenges for the future

  4. Status report on the HFR conversion and re-licensing project

    International Nuclear Information System (INIS)

    Wijtsma, F.G.

    2003-01-01

    In 1999 the HFR license holder (JRC, Petten, the Netherlands) initiated a project to study the conversion of the HFR from HEU to LEU. The first phase of this project consisted of a parametric study to determine the optimum fuel element and control rod design within given boundary conditions such as geometry, density, performance and cycle length. Results of this study are a 22 plates fuel element (550 g 235 U) at a density of 4.8 g.cm -3 and a 17 plates control rod (440 g 235 U). The second phase contains all aspects related to the conversion including a full-scale test irradiation of a prototype LEU element. The actual conversion of the HFR requires a new license. For this reason the re-licensing project has started in 2001. In this context many studies have been performed e.g. Risk Scoping Study, Safety Analyses, TOPA (Technical, Operational, Personnel and Administrative) evaluation. The license application will be based on a new Safety Report and an Environmental Impact Statement and will be submitted to the competent Authorities at the end of October 2003. (author)

  5. Cogeneration plants in Italy: Licensing aspects

    International Nuclear Information System (INIS)

    Buscaglione, A.

    1991-01-01

    This paper focusses on administrative/bureaucratic problems relative to the licensing of cogeneration plants in Italy. The current stumbling block appears to lie in organizational difficulties relative to the coordination of various Government authorized safety committees responsible for the drafting up of suitable legislation governing cogeneration plant fire safety aspects. The author cites the possible environmental benefits in terms of air pollution abatement that could have been had with the timely start-up of a new 7 MW plant (in Lombardia) still awaiting its go-ahead authorization

  6. The end game must end before license renewal begins

    International Nuclear Information System (INIS)

    Allen, S.R.; Edwards, D.W.

    1995-01-01

    The quest for a process and strategy to achieve license renewal was begun in the mid-1980s with the view that renewal was an imperative. A major portion of the nation's future electric supply seemed to be at stake. For plants who were becoming noncompetitive because of annual capital recovery, license renewal also appeared as the means of survival. These two perceptions led to a third: License renewal should be sought immediately upon completion of the first 20 yr of operation. Although the basic engineering premise of license renewal remains sound, the perceptions regarding timing of an application may be incorrect. This paper suggests that a gauntlet of uncertainty exists for all plants. Further, it is most severe between the 20th and 30th years of operation. Thus, the competitive viability of the plant must be sustained for most of the initial term before license renewal can become a serious option

  7. What are the impacts of giving up the driver license?

    DEFF Research Database (Denmark)

    Siren, Anu Kristiina; Haustein, Sonja

    Objectives: Driving cessation is a gradual process, where driver’s self-regulation plays an important role. Age-based license renewal procedures may interfere with this process and trigger premature driving cessation. The present study compares drivers aged 69 years at the baseline who either...... should try to prevent unwarranted mobility loss. Licensing policies signaling that in old age continuing to drive is an exception rather than the rule may work against this goal....... renewed their driver’s license (“renewers”) or did not (“non-renewers”) over a two-year period. Methods: Data were collected by interviewing a sample of older Danish people in 2009 (n = 1,792) and in 2012 (n = 863). The standardized interviews covered respondents’ background information, health and well...

  8. Nuclear reactor operator licensing

    International Nuclear Information System (INIS)

    Bursey, R.J.

    1978-01-01

    The Atomic Energy Act of 1954, which was amended in 1974 by the Energy Reorganization Act, established the requirement that individuals who had the responsibility of operating the reactors in nuclear power plants must be licensed. Section 107 of the act states ''the Commission shall (1) prescribe uniform conditions for licensing individuals; (2) determine the qualifications of such individuals; and (3) issue licenses to such individuals in such form as the Commission may prescribe.'' The article discusses the types of licenses, the selection and training of individuals, and the administration of the Nuclear Regulatory Commission licensing examinations

  9. Licensing in an international triopoly

    Science.gov (United States)

    Ferreira, Fernanda A.; Ferreira, Flávio

    2011-12-01

    We study the effects of entry of two foreign firms on domestic welfare in the presence of licensing, when the incumbent is technologically superior to the entrants. We consider two different situations: (i) the cost-reducing innovation is licensed to both entrants; (ii) the cost-reducing innovation is licensed to just one of the entrants. We analyse three kind of license: (lump-sum) fixed-fee; (per-unit) royalty; and two-part tariff, that is a combination of a fixed-fee and a royalty. We prove that a two part tariff is never an optimal licensing scheme for the incumbent. Moreover, (i) when the technology is licensed to the two entrants, the optimal contract consists of a licensing with only output royalty; and (ii) when the technology is licensed to just one of the entrants, the optimal contract consists of a licensing with only a fixed-fee.

  10. Demonstrating safety during license renewal should not be a large task

    International Nuclear Information System (INIS)

    Berto, D.S.

    1993-01-01

    The principal regulatory goal related to nuclear power plant operation is to ensure the health and safety of the public. The principal goal of extended plant operation via the license renewal process is also to ensure the health and safety of the public. The license renewal documentation issued by the Nuclear Regulatory Commission (NRC) provides guidance on what will be acceptable to the NRC in a license renewal application to demonstrate that this goal will be met. Application of this guidance is currently open to wide interpretation, with many of the current approaches proving to be extremely costly, complex, and uncertain of acceptability. This paper evaluates the requirements necessary to ensure the continued health and safety of the public during any license renewal term. This evaluation is based on the stated goals of the License Renewal Rule and on the published bases for the Rule. An approach to License Renewal is recommended that: (1) meets the stated goals of the NRC; (2) is consistent with current regulatory practices; and (3) will continue to ensure the health and safety of the public. This recommended approach is also much less costly than other current approaches, and can be easily agreed to by all participants. This approach will meet regulatory goals, while removing the cost and uncertainty obstacles currently being confronted by utilities. Providing a viable approach to license renewal will allow the renewal process to be pursued by utilities. Without such an approach, safe and reliable nuclear power plants will be permanently shut down at the arbitrary 40 year license limit

  11. 78 FR 48158 - Intent To Grant an Exclusive Patent License

    Science.gov (United States)

    2013-08-07

    ... the invention described and claimed in the U.S. patent entitled PROCESS FOR THE BIODEGRADATION OF... notice of its intent to grant an exclusive, royalty-bearing, revocable license to practice the invention... 404.5 and 404.7 of the U.S. Government patent licensing regulations. EPA will negotiate the final...

  12. Environmental review process: The U.S. experience

    International Nuclear Information System (INIS)

    Russo, T.N.

    1993-01-01

    The environmental review process used by the United States Federal Energy Regulatory Commission was discussed. The process has enabled the Commission to assess proposed small hydropower projects, but in the view of the author the Commission has done so at considerable cost and time to developers. Principal reasons for the delays and additional costs were examined, and ways were suggested that developers, agencies, regulators and other stakeholders could facilitate the siting of small hydropower projects without sacrificing the quality of the environmental review process. The highly duplicative nature of the environmental review process for hydropower projects was highlighted. The Commissions's power to regulate hydropower was claimed to have become severely eroded and the Energy Policy Act of 1992 did not significantly improve the process. Conflicts between developers, federal and state agencies, and the Commission over jurisdiction and interpretation of statutes continue to cause siting delays, which could render many projects financially infeasible. A more proactive Federal Energy Regulatory Commission was suggested to work with developers, agencies, Indian tribes and non-government organizations to resolve disputes. 1 tab

  13. Viewpoint – Brazil’s Madeira River Dams: A Setback for Environmental Policy in Amazonian Development

    Directory of Open Access Journals (Sweden)

    Philip Martin Fearnside

    2014-02-01

    Full Text Available Decisions on hydroelectric dam construction will be critical in shaping the future of Amazonia, where planned dams would convert most tributaries into chains of reservoirs. The Santo Antônio and Jirau dams, now nearing completion on the Madeira River, have created dangerous precedents in a trend towards weakening environmental protection in Brazil. Political appointees have overruled the technical staff of the Brazilian Institute for the Environment and Renewable Natural Resources (IBAMA, which is responsible for evaluating the environmental impact study (EIA and for licensing dams. Installation licences were granted without satisfying many of the 'conditions' that had been established as prerequisites. This feature and several others of the licensing process for the Madeira River dams have now been repeated in licensing the controversial Belo Monte Dam on the Xingu River. Brazil plans to build 30 large dams in its Amazon region in a decade, and others are to be financed and built by Brazil in Peru, Bolivia, Ecuador and Guyana. These plans affect virtually all water resources in an area larger than Western Europe. The Madeira River dams indicate the need to reform the decision-making process in Brazil.

  14. The Role of License Renewal in PLiM for U.S. Nuclear Power Plants

    International Nuclear Information System (INIS)

    Young, G.G.

    2012-01-01

    At the 2nd International Symposium on Nuclear Power Plant Life Management (PLiM) in 2007, it was reported that the NRC had approved renewal of operating licenses for 48 nuclear units, which would allow operation for up to 60 years (i.e., an additional 20 years from the original 40-year license term). Of the 104 operating nuclear units in the U.S. in 2007, it was anticipated that almost 100% would eventually pursue license renewal. At that time, it was also concluded that the regulatory process was stable and predictable for license renewal, and that successful PLiM activities were helping to ensure the safety, economic, and political factors in the U.S. remained favorable for continued success with license renewal. The status of license renewal in 2012 is even better than it was in 2007. As of April 2012, the NRC has approved renewal of the operating licenses for 71 nuclear units and has applications under review for 15 more units. In addition, nuclear plant owners of at least 14 more units have announced plans to submit license renewal applications over the next few years. This brings the total of renewed licenses and announced plans for license renewal to 96% of the 104 currently operating nuclear units in the U.S. The prediction that almost 100% would eventually pursue license renewal is assured. This positive trend for long term operation of nuclear power plants in the U.S. is attributed to: (1) the success of PLiM activities in achieving an excellent safety record for the nuclear power industry and in ensuring on-going positive economics for nuclear plant operation, and (2) the stable and predictable regulatory process for license renewal. U.S. efforts are now underway to consider long term operation for more than 60 years and the process of preparing a second round of license renewals for up to 80 years of operation is likely to begin within the next few years. (author)

  15. Environmental assessment of remedial action at the Naturita Uranium Processing Site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-05-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contain measures to control the contaminated materials and to protect groundwater quality. Remedial action at the Naturita site must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of Colorado. The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to either the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast, or a licensed non-DOE disposal facility capable of handling RRM. At either disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed Dry Flats disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action would be conducted by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. This report discusses environmental impacts associated with the proposed remedial action

  16. 14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... Conditions § 431.73 Continuing accuracy of license application; application for modification of license. (a...

  17. Licensing and regulatory control of nuclear power plants in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Schnurer, H.

    1975-01-01

    Legal basis; licensing requirements by the Atomic Energy Act, national law, international law and recommendations, and by technical rules and standards; licensing process: types of licences, responsibilities, sequence of the procedure; role of technical advisory bodies, enforcement of licensing actions. (HP) [de

  18. The U.S. Nuclear Regulatory Commission's antitrust review of nuclear power plants: the conditioning of licenses

    International Nuclear Information System (INIS)

    Penn, D.W.; Delaney, J.B.; Honeycutt, T.C.

    1976-04-01

    The 1970 amendments to Section 105 of the Atomic Energy Act require the Nuclear Regulatory Commission to conduct a prelicensing antitrust review of applications for licenses to construct and operate nuclear power plants. The Commission must make a finding as to whether the granting of a license 'would create or maintain a situation inconsistent with the antitrust laws,' and it has the authority to issue or continue a license, to refuse to issue a license, to rescind or amend a license, and to issue a license with conditions that it deems appropriate. This report provides information about the antitrust license conditions that have resulted from the NRC's antitrust review process. The process itself is described and a catalog of the applications requiring antitrust license conditions is presented. For each application, the license conditions are put into the general categories of unit access, transmission services, coordination, and contractual provisions. For completeness, the report also catalogs applications requiring no antitrust license conditions, and lists applications that were exempted from the 1970 amendments, are the subject of litigation, or have been withdrawn

  19. NRC licensing of uranium enrichment plants

    International Nuclear Information System (INIS)

    Moran, B.W.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) is preparing a rule making that establishes the licensing requirements for low-enriched uranium enrichment plants. Although implementation of this rule making is timed to correspond with receipt of a license application for the Louisiana Energy Services centrifuge enrichment plant, the rule making is applicable to all uranium enrichment technologies. If ownership of the US gaseous diffusion plants and/or atomic vapor laser isotope separation is transferred to a private or government corporation, these plants also would be licensable under the new rule making. The Safeguards Studies Department was tasked by the NRC to provide technical assistance in support of the rule making and guidance preparation process. The initial and primary effort of this task involved the characterization of the potential safeguards concerns associated with a commercial enrichment plant, and the licensing issues associated with these concerns. The primary safeguards considerations were identified as detection of the loss of special nuclear material, detection of unauthorized production of material of low strategic significance, and detection of production of uranium enriched to >10% 235 U. The primary safeguards concerns identified were (1) large absolute limit of error associated with the material balance closing, (2) the inability to shutdown some technologies to perform a cleanout inventory of the process system, and (3) the flexibility of some technologies to produce higher enrichments. Unauthorized production scenarios were identified for some technologies that could prevent conventional material control and accounting programs from detecting the production and removal of 5 kg 235 U as highly enriched uranium. Safeguards techniques were identified to mitigate these concerns

  20. Licensed Healthcare Facilities

    Data.gov (United States)

    California Natural Resource Agency — The Licensed Healthcare Facilities point layer represents the locations of all healthcare facilities licensed by the State of California, Department of Health...

  1. The Canadian Nuclear Safety Commission regulatory process for decommissioning a uranium mining facility

    International Nuclear Information System (INIS)

    Scissons, K.; Schryer, D.M.; Goulden, W.; Natomagan, C.

    2002-01-01

    The Canadian Nuclear Safety Commission (CNSC) regulates uranium mining in Canada. The CNSC regulatory process requires that a licence applicant plan for and commit to future decommissioning before irrevocable decisions are made, and throughout the life of a uranium mine. These requirements include conceptual decommissioning plans and the provision of financial assurances to ensure the availability of funds for decommissioning activities. When an application for decommissioning is submitted to the CNSC, an environmental assessment is required prior to initiating the licensing process. A case study is presented for COGEMA Resources Inc. (COGEMA), who is entering the decommissioning phase with the CNSC for the Cluff Lake uranium mine. As part of the licensing process, CNSC multidisciplinary staff assesses the decommissioning plan, associated costs, and the environmental assessment. When the CNSC is satisfied that all of its requirements are met, a decommissioning licence may be issued. (author)

  2. What are the impacts of giving up the driver license?

    OpenAIRE

    Siren, Anu Kristiina; Haustein, Sonja

    2013-01-01

    Objectives: Driving cessation is a gradual process, where driver’s self-regulation plays an important role. Age-based license renewal procedures may interfere with this process and trigger premature driving cessation. The present study compares drivers aged 69 years at the baseline who either renewed their driver’s license (“renewers”) or did not (“non-renewers”) over a two-year period.Methods: Data were collected by interviewing a sample of older Danish people in 2009 (n = 1,792) and in 2012...

  3. Industrial-Scale Processes For Stabilizing Radioactively Contaminated Mercury Wastes

    International Nuclear Information System (INIS)

    Broderick, T. E.; Grondin, R.

    2003-01-01

    This paper describes two industrial-scaled processes now being used to treat two problematic mercury waste categories: elemental mercury contaminated with radionuclides and radioactive solid wastes containing greater than 260-ppm mercury. The stabilization processes were developed by ADA Technologies, Inc., an environmental control and process development company in Littleton, Colorado. Perma-Fix Environmental Services has licensed the liquid elemental mercury stabilization process to treat radioactive mercury from Los Alamos National Laboratory and other DOE sites. ADA and Perma-Fix also cooperated to apply the >260-ppm mercury treatment technology to a storm sewer sediment waste collected from the Y-12 complex in Oak Ridge, TN

  4. 2015 Business Licenses

    Data.gov (United States)

    City of Jackson, Mississippi — This data displays all business license information for the year of 2015. This information details license classifications and status. This information will updated...

  5. Developing a workable public input process for aesthetics and recreational needs during hydropower licensing

    International Nuclear Information System (INIS)

    Howe, D.; Stimac, M.

    1993-01-01

    Aesthetics and recreation are becoming increasingly important issues during hydropower licensing. A variety of regulations and legislation mandate the protection of instream flows for aesthetic and recreational resources. These have provided impetus for determining the effects of instream flows on recreation and aesthetic resources. A public survey designed for a proposed small hydropower project, located in a heavily used recreation area, attempts to determine the aesthetic and recreational preferences for instream flows. The major components in designing the survey are discussed. The public input process is still underway, however, preliminary results indicate lower flows in the river are generally preferable by visitors of the area. This is likely because of the types of users and the recreation activities performed

  6. PC-based car license plate reader

    Science.gov (United States)

    Hwang, Chung-Mu; Shu, Shyh-Yeong; Chen, Wen-Yu; Chen, Yie-Wern; Wen, Kuang-Pu

    1992-11-01

    A car license plate reader (CLPR) using fuzzy inference and neural network algorithm has been developed in Industrial Technology Research Institute (ITRI) and installed in highway toll stations to identify stolen cars. It takes an average of 0.7 seconds to recognize a car license plate by using a PC with 80486-50 CPU. The recognition rate of the system is about 97%. The techniques of CLPR include vehicle sensing, image grab control, optic pre- processing, lighting, and optic character recognition (OCR). The CLPR can be used in vehicle flow statistics, the checking of stolen vehicles, automatic charging systems in parking lots or garage management, and so on.

  7. MEX04/058 supporting the license renewal of the LVNPP

    International Nuclear Information System (INIS)

    Diaz, A.; Arganis, C.; Viais, J.; Mendoza, G.; Lucatero, M. A.; Contreras, A.

    2010-10-01

    Nuclear power plants in the United States are authorized to operate for 40 years. However, this 40-year period was chosen based on economic considerations and not on technological restrictions or safety aspects. In general, the operation of equipment, systems and components in a nuclear power plant is subject to rigorous maintenance and inspection monitoring under strict surveillance programs throughout their life. In fact, according to the Nuclear Energy Institute, in December 2009, 59 nuclear power plants in the United States had already reached the 40 years of the original operating license and carried out their renewal process, extending their operation for up to 20 more years. These 59 nuclear power plants carried out their renewal process, basing their operation mainly on safety reviews that validated the good working order of systems, structures and components, meeting the technical specifications required, as well as complying with the specific safety provisions for prolonging the use of a operating license. The owner is responsible for showing the Regulatory Agency that it is capable of effectively managing the aging of the systems, structures and components,guaranteeing their good working order during the renewal period. In the specific case of Mexico, Unit 1 of the Laguna Verde Nuclear Power Plant (LVNPP) has an original 30-year license, with almost 20 years of proper operation, for which, in order to request a license extension, it is necessary to begin management activities, which allow for constituting and submitting the license renewal application to the Regulatory Agency in order to continue its commercial operation. This paper presents some of most important activities carried out by Instituto Nacional de Investigaciones Nucleares and LVNPP in the international project MEX04/058, related to Plant Life Management as a support of the beginning of plant license renewal process. (Author)

  8. Obstacles to engaging in young driver licensing: Perspectives of parents.

    Science.gov (United States)

    Naz, Sehana; Scott-Parker, Bridie

    2017-02-01

    Young novice drivers remain at greater risk of injury and death despite a wealth of interventions including graduated driver licensing (GDL) programs. The key to implementing safer practices inherent in GDL appears to lie with optimising the role of parents. This qualitative research explored the parent's perspectives of obstacles to engaging in the driver licensing process within a GDL program. Parents also shared advice on what they found helpful, and where relevant, recommended changes in the process to enable safer practices for young drivers. Twenty-three parents (aged 35-60 years, M=49.52, SD=8.01, 11 males) participated in semi-structured interviews regarding licensing experiences with their young driver children. The young drivers included learner (n=11), provisional (restricted/intermediate) (n=9) and open (unrestricted/full) licence drivers (n=3), ranging from 16 to 24 years (M=18.04, SD=2.21, 13 males). Content analysis revealed that most obstacles were encountered at the learner licensing phase, with the parent-reported difficult temperament of the learner driver the most prominent. Unsurprisingly, advice to other parents to be patient and remain calm featured heavily during the same phase. Anxiety from not having control of the vehicle was another obstacle at the learner phase, translating to anxieties for child safety in the early stages of provisional driving. Recommendations for the current GDL included more rigorous road rule testing, with general support for the program, professional driver training at learner and provisional stages facilitated parental engagement through the licensing phases. The findings overwhelmingly suggest a need for parents to be educated regarding their importance in, and of, the driver licensing process, and the efficacy of their instruction, content and practices. Copyright © 2016 Elsevier Ltd. All rights reserved.

  9. Radiopharmaceutical licensing

    International Nuclear Information System (INIS)

    Mather, S.J.

    1992-01-01

    Recent health service legislation, and especially the loss of crown immunity has once again focussed attention on the arrangements for licensing of radiopharmaceuticals. The aim of the article is to describe in general terms the UK licensing system and in particular to provide guidance to those responsible for the supply of radiopharmaceuticals in hospitals. (author)

  10. Operator licensing examination standards for power reactors. Interim revision 8

    International Nuclear Information System (INIS)

    1997-01-01

    These examination standards are intended to assist NRC examiners and facility licensees to better understand the processes associated with initial and requalification examinations. The standards also ensure the equitable and consistent administration of examinations for all applicants. These standards are for guidance purposes and are not a substitute for the operator licensing regulations (i.e., 10 CFR Part 55), and they are subject to revision or other changes in internal operator licensing policy. This interim revision permits facility licensees to prepare their initial operator licensing examinations on a voluntary basis pending an amendment to 10 CFR Part 55 that will require facility participation. The NRC intends to solicit comments on this revision during the rulemaking process and to issue a final Revision 8 in conjunction with the final rule

  11. Sensor network based vehicle classification and license plate identification system

    Energy Technology Data Exchange (ETDEWEB)

    Frigo, Janette Rose [Los Alamos National Laboratory; Brennan, Sean M [Los Alamos National Laboratory; Rosten, Edward J [Los Alamos National Laboratory; Raby, Eric Y [Los Alamos National Laboratory; Kulathumani, Vinod K [WEST VIRGINIA UNIV.

    2009-01-01

    Typically, for energy efficiency and scalability purposes, sensor networks have been used in the context of environmental and traffic monitoring applications in which operations at the sensor level are not computationally intensive. But increasingly, sensor network applications require data and compute intensive sensors such video cameras and microphones. In this paper, we describe the design and implementation of two such systems: a vehicle classifier based on acoustic signals and a license plate identification system using a camera. The systems are implemented in an energy-efficient manner to the extent possible using commercially available hardware, the Mica motes and the Stargate platform. Our experience in designing these systems leads us to consider an alternate more flexible, modular, low-power mote architecture that uses a combination of FPGAs, specialized embedded processing units and sensor data acquisition systems.

  12. Manual for conducting radiological surveys in support of license termination

    International Nuclear Information System (INIS)

    Berger, J.D.

    1992-06-01

    This document describes a process for conducting radiological surveys during decommissioning, to demonstrate that residual radioactive material satisfies criteria established by the U.S. Nuclear Regulatory Commission (NRC) for termination of a license. The Manual describes procedures for design and conduct of surveys in a manner which will provide a high degree of assurance that NRC guidelines and conditions have been satisfied. The Manual also describes methods for documenting the survey findings in a final report to the NRC. This Manual updates information contained in NUREG/CR-2082, Monitoring for Compliance with Decommissioning Termination Survey Criteria, (ORNL 1981). It incorporates statistical approaches to survey design and data interpretation used by the Environmental Protection Agency for evaluation of hazardous materials sites under Superfund (CERCLA). Quality assurance is emphasized throughout. (author)

  13. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  14. License to build

    International Nuclear Information System (INIS)

    Huntelaar, Mark; Vos, Renate de; Roobol, Lars

    2007-01-01

    Full text: A new license under the nuclear power act is applied for at the Dutch Government for the building of a High Active Repackaging Unit (HAVA-VU in Dutch) at NRG in Petten, The Netherlands. This new building is necessary to comply with our nuclear license to dispose of high active nuclear waste at Petten to the intermediate storage facility (COVRA). In the first part of this paper attention is given to the formal procedure followed by the Government, what type of documents are to be submitted, what time frames are followed, how citizen participation is organized, and as final result a new license. In the second part more detailed information is given about the present license renewal needed for the High Active Repackaging Unit

  15. Advanced CANDU reactor pre-licensing progress

    International Nuclear Information System (INIS)

    Popov, N.K.; West, J.; Snell, V.G.; Ion, R.; Archinoff, G.; Xu, C.

    2005-01-01

    The Advanced CANDU Reactor (ACR) is an evolutionary advancement of the current CANDU 6 reactor, aimed at producing electrical power for a capital cost and at a unit-energy cost significantly less than that of the current reactor designs. The Canadian Nuclear Safety Commission (CNSC) staff are currently reviewing the ACR design to determine whether, in their opinion, there are any fundamental barriers that would prevent the licensing of the design in Canada. This CNSC licensability review will not constitute a licence, but is expected to reduce regulatory risk. The CNSC pre-licensing review started in September 2003, and was focused on identifying topics and issues for ACR-700 that will require a more detailed review. CNSC staff reviewed about 120 reports, and issued to AECL 65 packages of questions and comments. Currently CNSC staff is reviewing AECL responses to all packages of comments. AECL has recently refocused the design efforts to the ACR-1000, which is a larger version of the ACR design. During the remainder of the pre-licensing review, the CNSC review will be focused on the ACR-1000. AECL Technologies Inc. (AECLT), a wholly-owned US subsidiary of AECL, is engaged in a pre-application process for the ACR-700 with the US Nuclear Regulatory Commission (USNRC) to identify and resolve major issues prior to entering a formal process to obtain standard design certification. To date, the USNRC has produced a Pre-Application Safety Assessment Report (PASAR), which contains their reviews of key focus topics. During the remainder of the pre-application phase, AECLT will address the issues identified in the PASAR. Pursuant to the bilateral agreement between AECL and the Chinese nuclear regulator, the National Nuclear Safety Administration (NNSA) and its Nuclear Safety Center (NSC), NNSA/NSC are reviewing the ACR in seven focus areas. The review started in September 2004, and will take three years. The main objective of the review is to determine how the ACR complies

  16. Department of Energy interest and involvement in nuclear plant license renewal activities

    International Nuclear Information System (INIS)

    Bustard, Larry D.; Harrison, Dennis L.

    1991-01-01

    Recognizing the importance of nuclear license renewal to the nation's energy strategy, the Department of Energy (DOE) initiated a plant lifetime improvement program during 1985 to determine the feasibility of the license renewal option for US nuclear plants. Initial activities of the DOE program focused on determining whether there were technical and economic obstacles that might preclude or limit the successful implementation of the license renewal option. To make this determination, DOE co-sponsored with the Electric Power Research Institute (EPRI) 'pilot-plant' efforts by Virginia Electric Power and Northern States Power. Both pilot-plant efforts concluded that life extension is technically and economically feasible. In parallel with the pilot plant activities, DOE performed national economic studies that demonstrated the economic desirability of life extension. Having demonstrated the feasibility of life extension, DOE, in conjunction with EPRI, selected two lead plants to demonstrate the license renewal process. These lead plants are Yankees Atomic's Yankee Rowe facility and Northern States Power's Monticello facility. DOE also initiated activities to develop the technical and regulatory bases to support the license renewal process in the United States. These include (1) development of a methodology for identifying systems, structures, and components important to license renewal, (2) development of industry reports that describe industry-accepted approaches for license renewal of ten important classes of equipment, (3) development of technical basis to support license renewal, and (4) interaction/negotiation with the NRC through the Nuclear Management Resources Council (NUMARC) regarding appropriate regulatory requirements for license renewal. DOE has recently identified nuclear plant license renewal to be an important element of its National Energy Strategy. This paper summarizes the significant results, conclusions and ongoing activities of the DOE effort

  17. Harmonization of the licensing process for digital instrumentation and control systems in nuclear power plants. Report prepared within the framework of the Technical Working Group on Nuclear Power Plant Control and Instrumentation

    International Nuclear Information System (INIS)

    2002-12-01

    This report was prepared in response to the recommendation of the Technical Working Group on Nuclear Power Plant Control and Instrumentation (TWG-NPPCI). This recommendation was based on the recognition of the present diversity in national practices in licensing digital Instrumentation and control (I and C). The goal of this report is to promote harmonization of I and C licensing requirements in the Member States. It applies to I and C modernization, retrofits, upgrades, replacement, new installation, and other aspects of digital I and C in both existing and new nuclear power plants. It should be pointed out that a single publication, like this report, can only take the first step towards initiating a process leading to licensing requirements, which are more harmonized. It is therefore hoped that that this report will get a broad readership among those who can influence requirements that are set on digital I and C. This report provides general and high level recommendations to assist senior officials at utilities, vendor organizations, regulatory bodies, and their support organizations who are involved in the licensing of digital I and C. It is also intended to be read by persons participating in technical committees which are writing standards. The authors of this report believe that harmonization can be achieved through a consideration of the technical and scientific basis of high integrity digital I and C systems. It is also believed that many benefits can be reached in resolving various issues of a technical and engineering nature, which presently are creating controversies in the licensing of digital I and C in NPP safety applications. This publication is based on a consideration of the licensing process of I and C in a top down fashion to discuss generic principles to be applied when assessing digital I and C in NPP safety applications. This report gives an overview of the confidence building process in which evidence is created that digital I and C fulfils

  18. Economics of license renewal in the U.S. - entergy's perspective

    International Nuclear Information System (INIS)

    Young, Garry G.

    2003-01-01

    License renewal of operating nuclear plants in the United States has become one of the most successful U.S. nuclear regulatory activities in the past few years. In 1995, the U.S. Nuclear Regulatory Commission (NRC) published a revised rule in 10 CFR Part 54 that provided the requirements for an operating nuclear plant to seek license renewal. At that time, many people believed that only a select few operating nuclear plants would pursue license renewal and that most plants would operate for no more than 40 years. By mid-2003, the owners of approximately 52% of the U.S. nuclear fleet of 103 operating nuclear plants have decided to pursue license renewal and more are expected to follow. This change in direction since 1995 can be attributed to the improving economics of U.S. nuclear power plant operation and to the improved regulatory process resulting from the 1995 revision to 10 CFR Part 54. In 2000, Entergy submitted a license renewal application for Arkansas Nuclear One, Unit 1 (ANO-1). This application was the third to be submitted to the NRC at a time when it was still unclear how successful the regulatory process might be. However, less than 17 months later, in June 2001, the NRC granted a renewed operating license for ANO-1 at a total cost of approximately $11 million. Due in part to the ANO-1 license renewal success, Entergy now has tentative plans to pursue license renewal for the entire fleet of operating nuclear power plants. Without license renewal, Entergy's current nuclear fleet capacity of approximately 9,000 MW(e) would begin to decline in 2012. With license renewal, Entergy's nuclear fleet capacity can remain in place until 2032. This projection does not include the expected improvements in capacity due to power uprate that is currently planned. The combination of power uprate and license renewal will add significant economic value to Entergy's nuclear fleet. One of the major factors in strong performance is capacity factor. In 1990, the average

  19. Recycling and disposal of FUSRAP materials from the Ashland 2 site at a licensed uranium mill

    International Nuclear Information System (INIS)

    Howard, B.; Conboy, D.; Rehmann, M.; Roberts, H.

    1999-01-01

    During World War II the Manhattan Engineering District (MED) used facilities near Buffalo, N.Y. to extract natural uranium from ores. Some of the byproduct material left from the ores (MED byproduct), containing low levels of uranium, thorium, and radium, was deposited on a disposal site known as Ashland 2, located in Tonawanda, NY. On behalf of the United States Army Corps of Engineers (USACE, or the Corps), ICF Kaiser Engineers (ICFKE) was tasked to provide the best value clean-up results that meet all of the criteria established in the Record of Decision for the site. International Uranium (USA) Corporation (IUC), the operator of the White Mesa Uranium Mill, a Nuclear Regulatory Commission (NRC)-licensed mill near Blanding, Utah, was selected to perform uranium extraction on the excavated materials, therefore giving the best value as it provided beneficial use of the material consistent with the Resource Conservation and Recovery Act (RCRA) intent to encourage recycling and recovery, while also providing the most cost-effective means of disposal. Challenges overcome to complete this project included (1) identifying the best-value location to accept the material; (2) meeting regulatory requirements with IUC obtaining an NRC license amendment to accept and process the material as an alternate feed; (3) excavating and preparing the material for shipment, then shipping the material to the Mill for uranium recovery; and (4) processing the material, followed by disposal of tailings from the process in the Mill's licensed uranium tailings facility. Excavation from Ashland 2 and processing of the Ashland 2 material at the White Mesa Mill resulted in a cleaner environment at Tonawanda, a cost avoidance of up to $16 million, beneficial recovery of source material, and environmentally protective disposal of byproduct material. (author)

  20. Role of fission gas release in reactor licensing

    International Nuclear Information System (INIS)

    1975-11-01

    The release of fission gases from oxide pellets to the fuel rod internal voidage (gap) is reviewed with regard to the required safety analysis in reactor licensing. Significant analyzed effects are described, prominent gas release models are reviewed, and various methods used in the licensing process are summarized. The report thus serves as a guide to a large body of literature including company reports and government documents. A discussion of the state of the art of gas release analysis is presented

  1. Contestable Licensing

    OpenAIRE

    Zvika Neeman; Gerhard O. Orosel

    2000-01-01

    We analyze a model of repeated franchise bidding for natural monopoly with contestable licensing - a franchisee halds an (exclusive) license to operate a franchise until another rm offers to pay more for it. In a world where quality is observable but not veri able, the simple regulatory scheme we describe combines market-like incentives with regulatory oversight to generate efficient outcomes.

  2. How Is Environmental Proactivity Accomplished? Drivers and Barriers in Firms’ Pro-Environmental Change Process

    Directory of Open Access Journals (Sweden)

    Jesús Valero-Gil

    2017-07-01

    Full Text Available The contaminating effects of economic activity and the scarcity of natural resources has led firms to a situation in which corporate strategy has been compromised by environmental issues. The objective of this paper is to analyse some of the factors determining the pro-environmental change process by considering the drivers encouraging firms to progress in environmental protection and the barriers that curb this progress. Using a structural equation model implemented on a sample of 303 firms, our results confirm a direct and positive effect of stakeholder pressure and of the expectations of obtaining competitive advantages from the pro-environmental change process. The results also confirmed the indirect effect of stakeholder pressure on pro-environmental change through managers’ expectations of obtaining competitive advantages, which play a mediating role in the firm’s response. Although managers interpret the barriers we have studied as obstacles to adopting environmental protection measures, they do not prevent any firm from reaching advanced levels of pro-environmental change.

  3. Environmental Criteria in the Spanish Public Works Procurement Process

    Directory of Open Access Journals (Sweden)

    José Luis Fuentes-Bargues

    2017-02-01

    Full Text Available Green Public Procurement (GPP is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain group of countries, known as “Green 7”, in the European Union. Environmental criteria is the fourth criterion in importance, but its weight in the global of the process is much lower than other criteria such as price, memory of the construction process and the delivery time. National administrations use environmental criteria more frequently because they have more resources and staff training about environmental issues. Environmental criteria are more used in the tendering of civil projects and works whose budget exceeds ten million euro due to the environmental impact of these kind and/or size of projects.

  4. The nature table as a means of promoting environmental awareness ...

    African Journals Online (AJOL)

    The nature table as a means of promoting environmental awareness. Anne Curror. Abstract. No Abstract. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT · Creative Commons License This work is licensed under a Creative Commons Attribution 3.0 License.

  5. Nuclear fuel licensing requirements: present status and future trends

    International Nuclear Information System (INIS)

    Gantchev, T.; Vitkova, M.; Gorinov, I.; Datcheva, D.; Rashkova, N.

    2001-01-01

    The nuclear fuel licensing process must be directed to establishing of criteria for licensing (fuel safety criteria) and relationship between safety limits, technical specifications and operational conditions. This paper discusses the fuel safety criteria as used by NRC and Russian vendor. A survey on the available fuel behavior, modeling and related computer codes is given with respect to help the licensing process including new safety features of general changes in fuel design and operational conditions. Several types of computer codes that are used in safety analysis are sensitive to fuel-related parameters. The need for further code development and verification has been stated on many occasions: new design elements, such as different cladding materials, higher burnup, different fuel microstructure and use of MOX fuel can affect the performance of these codes. Regulatory inspection practices during operation and refueling in different countries are also shown. Future trends are discussed in particular with regard to the coming high burnup and to new core management schemes

  6. Relevant aspects in licensing of radioactive installations at petroleum and gas well logging

    International Nuclear Information System (INIS)

    Miranda, Marcia Valeria da E. Sa

    2002-01-01

    The importance of the various factors considered during the process of licensing of radioactive installation for petroleum and gas well logging. This process involves the issuing of some public power acts, the co called Administrative Acts. For the radioactive installations the Administrative Acts are related to the Norm CNEN-NE-6.02 'Licensing of Radioactive Installation'. In the conduction of the licensing of radioactive installation of mobile nuclear measurement devices the safety evaluation of radioactive installation and equipment containing incorporated radiation source are included; certification of radioprotection supervisors; programing and evaluation of the radioprotection inspections; and the conduction of conformal inspection according to the project, safety analysis and audits. An evaluation of the impact of the importance grade attributed to each factor in the optimization of licensing process is related. Finally, the prediction of implantation of a control system for the displacement of radioactive sources in the installation is approached comprehending the up-to-date localization of each source at different work front of the Basis

  7. 77 FR 34093 - License Renewal for Calvert Cliffs Nuclear Power Plant, LLC's

    Science.gov (United States)

    2012-06-08

    ... Nuclear Power Plant, LLC's AGENCY: Nuclear Regulatory Commission. ACTION: Environmental assessment and... Spent Fuel Storage Installation (ISFSI) at the Calvert Cliffs Nuclear Power Plant site near Lusby... Cliffs Nuclear Power Plant, LLC (CCNPP) submitted an application to the NRC to renew NRC License SNM-2505...

  8. Nuclear plant license renewal

    International Nuclear Information System (INIS)

    Gazda, P.A.; Bhatt, P.C.

    1991-01-01

    During the next 10 years, nuclear plant license renewal is expected to become a significant issue. Recent Electric Power Research Institute (EPRI) studies have shown license renewal to be technically and economically feasible. Filing an application for license renewal with the Nuclear Regulatory Commission (NRC) entails verifying that the systems, structures, and components essential for safety will continue to perform their safety functions throughout the license renewal period. This paper discusses the current proposed requirements for this verification and the current industry knowledge regarding age-related degradation of structures. Elements of a license renewal program incorporating NRC requirements and industry knowledge including a schedule are presented. Degradation mechanisms for structural components, their significance to nuclear plant structures, and industry-suggested age-related degradation management options are also reviewed

  9. 76 FR 41528 - Notice of Availability of Environmental Assessment and Finding of No Significant Impact for...

    Science.gov (United States)

    2011-07-14

    ... license renewal. Staff considered the following environmental resource areas in its evaluation: Land use... Protection and Performance Assessment Directorate, Division of Waste Management and Environmental Protection... Environmental Assessment and Finding of No Significant Impact for License Renewal for Uranium One USA Inc...

  10. Management of the licensing of users of radioactive materials should be improved

    International Nuclear Information System (INIS)

    1976-01-01

    Radioactive material licenses are required for manufacturing nuclear fuel for reactors and for industrial, commercial, medical, and educational uses of radioactive materials. This type of license is not for constructing or operating nuclear power reactors and facilities for processing used nuclear fuels. This report discusses the need for better management improvements in the NRC's program for licensing the users. As of December 31, 1974, there were 8,253 active NRC-issued material licenses held by 6,310 licensees. The study reviewed NRC's policies, procedures, and practices, and examined recent evaluations of state programs to identify problems encountered by the states

  11. The environmental communication forum | Goetz | Southern African ...

    African Journals Online (AJOL)

    The establishment, Modus operandi and aims of the Environmental Communicators Forum in the greater Durban area is described. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT · Creative Commons License This work is licensed under a Creative ...

  12. An environmental impact causal model for improving the environmental performance of construction processes

    OpenAIRE

    Fuertes Casals, Alba; Casals Casanova, Miquel; Gangolells Solanellas, Marta; Forcada Matheu, Núria; Macarulla Martí, Marcel; Roca Ramon, Xavier

    2013-01-01

    Despite the increasing efforts made by the construction sector to reduce the environmental impact of their processes, construction sites are still a major source of pollution and adverse impacts on the environment. This paper aims to improve the understanding of construction-related environmental impacts by identifying on-site causal factors and associated immediate circumstances during construc- tion processes for residential building projects. Based on the literature and focus g...

  13. Final environmental statement related to the Atlas Minerals Division, Atlas Corporation, Atlas Uranium Mill (Grand County, Utah)

    International Nuclear Information System (INIS)

    1979-01-01

    The proposed action is the continuation of Source Material License SUA-917 issued to Atlas Corporation for the operation of the Atlas Uranium Mill in Grand County, Utah, near Moab (Docket No. 40-3453). The present mill was designed for an 1100 MT (1200 ton) per day processing rate with 0.25% uranium ore feed. The actual ore processing rate may vary up to 1450 MT (1600 ton) per day if lower grade ores are processed, but the annual production rate of 836 MT (921 tons) U 3 O 8 will not be exceeded. Possible environmental impacts and adverse effects are identified. Conditions for the protection of the environment are set forth before the license can be renewed

  14. Licensing of nuclear power plants. The case of Sweden in an international comparison

    International Nuclear Information System (INIS)

    Michanek, Gabriel; Soederholm, Patrik

    2009-01-01

    Efficient power plant licensing procedures are essential for the functioning of deregulated electricity markets. The purpose of this paper is to review and analyse the licensing process for nuclear power plants in Sweden, and in part contrast the Swedish case with the corresponding approaches in a selection of other countries. This approach permits a discussion of how licensing processes can be altered and what the benefits and drawbacks of such changes are. The paper highlights and discusses a number of important legal issues and implications, including, for instance: (a) the role of political versus impartial decision-making bodies; (b) the tension between national policy goals and implementation at the local level; (c) public participation and access to justice; (d) consistency and clarity of the legal system; and (e) the introduction of license time limits. (author)

  15. 15 CFR 970.701 - Significant adverse environmental effects.

    Science.gov (United States)

    2010-01-01

    ... under a license of scale-model mining systems which simulate commercial recovery could adversely affect... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES... Service or another Federal agency; (5) Meteorological observations and measurements, including the setting...

  16. Establishing credibility in the environmental models used for safety and licensing calculations in the nuclear industry

    International Nuclear Information System (INIS)

    Davis, P.A.

    1997-01-01

    Models that simulate the transport and behaviour of radionuclides in the environment are used extensively in the nuclear industry for safety and licensing purposes. They are needed to calculate derived release limits for new and operating facilities, to estimate consequences following hypothetical accidents and to help manage a real emergency. But predictions generated for these purposes are essentially meaningless unless they are accompanied by a quantitative estimate of the confidence that can be placed in them. For example, in an emergency where there has been an accidental release of radioactivity to the atmosphere, decisions based on a validated model with small uncertainties would likely be very different from those based on an untested model, or on one with large uncertainties. This paper begins with a discussion of some general methods for establishing the credibility of model predictions. The focus will be on environmental transport models but the principles apply to models of all kinds. Establishing the credibility of a model is not a trivial task, It involves a number of tasks including face validation, verification, experimental validation and sensitivity and uncertainty analyses. The remainder of the paper will present quantitative results relating to the credibility of environmental transport models. Model formation, choice of parameter values and the influence of the user will all be discussed as sources of uncertainty in predictions. The magnitude of uncertainties that must be expected in various applications of the models will be presented. The examples used throughout the paper are drawn largely from recent work carried out in BIOMOVS and VAMP. (DM)

  17. Conduct of regulatory review and assessment during the licensing process for nuclear power plants

    International Nuclear Information System (INIS)

    1980-01-01

    This Safety Guide was prepared as part of the Agency's programme, referred to as the NUSS programme, for establishing Codes of Practice and Safety Guides relating to nuclear power plants. It supplements the Code of Practice on Governmental Organization for the Regulation of Nuclear Power Plants (IAEA Safety Series No. 50-C-G) and is concerned with the review and assessment by the regulatory body of all information submitted in support of licence applications, in the various phases of the licensing process. The purpose of the Guide is to provide information, recommendations and guidance for the conduct of these activities. The scope of the review and assessment will encompass the safety aspects of siting, construction, commissioning, operation and decommissioning of each nuclear power plant

  18. Changes in environmental law. [German Federal Republic]. Umweltrecht im Wandel

    Energy Technology Data Exchange (ETDEWEB)

    Mayer-Tasch, P C

    1978-01-01

    In this study the changing process of environmental law is depicted which is marked by the ecological crisis and the increasing pressure of the ecological movement. Main emphasis is laid on the analysis of the reform of the ecological licensing and voidance procedures which is in the centre of the discussion about (environmental) law policy as well as on the jurisprudential enforcement of the basic environmental right on life and physical integrity. The volume ends with a study on 'Nuclear Energy, Law and Judiciary Power' - a subject which is of immediate interest and special significance with its far-reaching political consequences for ecology, energy, and economics.

  19. 31 CFR 596.306 - License.

    Science.gov (United States)

    2010-07-01

    ... ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.306 License. Except as otherwise specified, the term license means any license or...

  20. Understanding Licensing Behavior

    DEFF Research Database (Denmark)

    Cabaleiro, Goretti; Moreira, Solon; Reichstein, Toke

    The potential for rent dissipation has been argued to be the main cause of firms? licensing out behavior being stifled.However, this aspect has been scarcely studied empirically. We draw on rent dissipation arguments, and hypothesize that firms suffering from the not-invented-here (NIH) syndrome......, firms in competitive product markets, and firms that have incurred substantial sunk cost are associated with lower rates of technology out-licensing. We also posit that sunk costs negatively moderate the relationship between competition in the licensor?s product market, and licensing rate. We test our...

  1. Sodium Fast Reactor Safety and Licensing Research Plan

    International Nuclear Information System (INIS)

    Denman, Matthew; Lachance, Jeff; Sofu, Tanju; Wigeland, Roald; Flanagan, George; Bari, Robert

    2013-01-01

    Conclusions: The Sodium Fast Reactor Safety and Licensing Research Plan reports conclude a multi-year expert elicitation process. All information included in the studies are publicly available and the reports are UUR. These reports are intended to guide SFR researchers in the safety and licensing arena to important and outstanding issues Two (and a half) projects have been funded based on the recommendations in this report: • Modernization of SAS4A; • Incorporation of Contain/LMR with MELCOR; • (Data recovery at INL and PNNL)

  2. Nuclear power stations licensing

    International Nuclear Information System (INIS)

    Solito, J.

    1978-04-01

    The judicial aspects of nuclear stations licensing are presented. The licensing systems of the United States, Spain, France and Federal Republic of Germany are focused. The decree n 0 60.824 from July 7 sup(th), 1967 and the following legislation which define the systematic and area of competence in nuclear stations licensing are analysed [pt

  3. Establishment of regulatory framework for the development reactor licensing

    International Nuclear Information System (INIS)

    Jo, Jong C.; Yune, Young G.; Kim, Woong S.; Ahn, Sang K.; Kim, In G.; Kim, Hho J.

    2003-01-01

    With a trend that various types of advanced reactor designs are currently under development worldwide, the Korea Atomic Energy Research Institute has been developing an advanced reactor called ' System-integrated Modular Advanced Reactor (SMART)', which is a small sized integral type pressurized water reactor with a rated thermal power of 330 MW. To demonstrate the safety and the performance of the SMART reactor design, the SMART Research and Development Center has embarked to build a scaled-down pilot plant of SMART, called 'SMART-P' with a rated thermal power of 65 MW. In preparation for the forthcoming applications for both construction permit and operating license of SMART-P in the near future, the Korea Institute of Nuclear Safety is developing a new regulatory framework for licensing review of such a development reactor, which covers establishment of licensing process, identification and resolution of technical and safety issues, development of regulatory evaluation or verification-purpose computer codes and analytical methods, and establishment of design-specific, general design and operating criteria, regulations, and associated regulatory guides. This paper presents the current activities for establishing a regulatory framework for the licensing of a research and development reactor. Discussions are made on the SMART-P development program, the current Korean regulatory framework for reactor licensing, the SMART-P licensing-related issues, and the approach and strategy for developing an effective regulatory framework for the SMART-P licensing

  4. Practical issues in structuring seismic licensing and acquisition agreements

    International Nuclear Information System (INIS)

    Lawrence, M.A.

    1999-01-01

    Some issues facing the geophysical industry in the area of licensing and acquisition agreements are discussed, focusing on a very large business segment of the industry called 'non-exclusive' seismic data (commonly referred to as SPEC data). A historical perspective of the industry in the Gulf of Mexico is presented, highlighting some important aspects of data licenses. The benefits of licensing three-dimensional data to the exploration industry include: (1) economy of scale, (2) 3-D is more affordable, (3) reduced barriers to entry by independents, and (4) improved success rates and reduced risk. A list of 'SPEC' companies in the Gulf of Mexico is provided and the data licensing process is outlined. There are two basic types of seismic data use licenses. The first is for a single, one-time transaction, and the other (which is more prevalent), covers multiple use licenses contemplated over a period of time. This paper briefly outlined the meaning of some important terms usually found in a license agreement, among them ownership, rights of licensee, term, disclosure to third parties, and transfer. International 'SPEC' programs and the requirements for a successful 'SPEC' program are described. The requirements include: a stable host government, reliable, competitive system of concession offerings, long term scheduled offerings, clear, consistent, and acceptable concession terms to oil and gas companies, and consistent, fair and timely method of evaluating bids and awarding concessions. 001CA9901758

  5. Completion of decommissioning: Monitoring for site release and license termination

    International Nuclear Information System (INIS)

    Boing, L.E.

    1997-01-01

    To request termination of a license upon completion of dismantling or decommissioning activities, documenting any residual radioactivity to show that the levels are environmentally acceptable will be necessary. When the regulators approve the decommissioning plan, they establish what the release criteria for the decommissioned site will be at the time of the site release and license termination. The criteria are numeric guidelines for direct radiation in soils and on surfaces. If the regulatory body finds that the measured on-site values are below the guidelines, the site will be acceptable for unrestricted release (no radiological controls or future use). If areas are found above those values, more decontamination or cleanup of these areas may be required unless the regulatory body grants an exemption

  6. 18 CFR 5.22 - Notice of acceptance and ready for environmental analysis.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Notice of acceptance and ready for environmental analysis. 5.22 Section 5.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT INTEGRATED LICENSE APPLICATION PROCESS § 5.22 Notice o...

  7. Environmental impact assessment: Process and implementation

    International Nuclear Information System (INIS)

    Chen, S.Y.; Tsai, S.Y.

    1989-01-01

    In this paper, the procedures and issues regarding the preparation of an environmental impact assessment in accordance with the National Environmental Policy Act (NEPA) as promulgated by the US Congress in 1969 are discussed. NEPA procedures and requirements are covered in general, while particular attention is given to the preparation of the environmental impact assessment. Also included is a discussion of the social impact assessment. The aim of the social impact assessment is to address the social issues involved in enhancing public understanding of the hazardous risks, thereby mitigating any conflicts that may arise in the NEPA process. 3 refs., 1 fig., 1 tab

  8. Improved Methods for Production Manufacturing Processes in Environmentally Benign Manufacturing

    Directory of Open Access Journals (Sweden)

    Yan-Yan Wang

    2011-09-01

    Full Text Available How to design a production process with low carbon emissions and low environmental impact as well as high manufacturing performance is a key factor in the success of low-carbon production. It is important to address concerns about climate change for the large carbon emission source manufacturing industries because of their high energy consumption and environmental impact during the manufacturing stage of the production life cycle. In this paper, methodology for determining a production process is developed. This methodology integrates process determination from three different levels: new production processing, selected production processing and batch production processing. This approach is taken within a manufacturing enterprise based on prior research. The methodology is aimed at providing decision support for implementing Environmentally Benign Manufacturing (EBM and low-carbon production to improve the environmental performance of the manufacturing industry. At the first level, a decision-making model for new production processes based on the Genetic Simulated Annealing Algorithm (GSAA is presented. The decision-making model considers not only the traditional factors, such as time, quality and cost, but also energy and resource consumption and environmental impact, which are different from the traditional methods. At the second level, a methodology is developed based on an IPO (Input-Process-Output model that integrates assessments of resource consumption and environmental impact in terms of a materials balance principle for batch production processes. At the third level, based on the above two levels, a method for determining production processes that focus on low-carbon production is developed based on case-based reasoning, expert systems and feature technology for designing the process flow of a new component. Through the above three levels, a method for determining the production process to identify, quantify, assess, and optimize the

  9. FOSS License Selection and Code Management

    OpenAIRE

    Vescuso, Peter

    2011-01-01

    With nearly 2,000 free and open source software (FLOSS) licenses, software license proliferation¿ can be a major headache for software development organizations trying to speed development through software component reuse, as well as companies redistributing software packages as components of their products. Scope is one problem: from the Free Beer license to the GPL family of licenses to platform-specific licenses such as Apache and Eclipse, the number and variety of licenses make it difficu...

  10. Learning-by-Licensing: How Chinese Firms Benefit From Licensing-In Technologies

    DEFF Research Database (Denmark)

    Wang, Yuandi; Roijakkers, N.; Vanhaverbeke, W.

    2012-01-01

    This paper explores how interfirm variations in their in-licensed technology portfolios influence subsequent innovation performance. Existing studies mainly assume licensed technologies are homogeneously accessible to firms, and a prevailing explanation as to why firms vary in their innovation pe...

  11. Why operators fail licensing examinations

    International Nuclear Information System (INIS)

    Roth, D.R.; Zerbo, J.N.

    1975-01-01

    A survey was conducted among nuclear utility operators who have taken NRC licensing examinations to determine which factors they considered important in their success or failure. The operators also compared the actual NRC examination with their expectations prior to taking the examination. The results of the survey supplement NRC statistics with regard to failure rates. Over 350 operators and 20 utilities participated in the survey and a good cross section of the nuclear community is represented. Reactor theory and emergency procedures are important areas in which operators found NRC emphasis to be different than expected. Observation Training and Design Lecture Series are two training segments which appear to require improvement. Recommendations are made for the use of data collected through this survey and for continuation of the effort to give operators a mechanism of supplying feedback to the training and licensing process

  12. A Malaysian Vehicle License Plate Localization and Recognition System

    Directory of Open Access Journals (Sweden)

    Ganapathy Velappa

    2008-02-01

    Full Text Available Technological intelligence is a highly sought after commodity even in traffic-based systems. These intelligent systems do not only help in traffic monitoring but also in commuter safety, law enforcement and commercial applications. In this paper, a license plate localization and recognition system for vehicles in Malaysia is proposed. This system is developed based on digital images and can be easily applied to commercial car park systems for the use of documenting access of parking services, secure usage of parking houses and also to prevent car theft issues. The proposed license plate localization algorithm is based on a combination of morphological processes with a modified Hough Transform approach and the recognition of the license plates is achieved by the implementation of the feed-forward backpropagation artificial neural network. Experimental results show an average of 95% successful license plate localization and recognition in a total of 589 images captured from a complex outdoor environment.

  13. Spatial service delivery system for smart licensing & enforcement management

    Science.gov (United States)

    Wahap, N. A.; Ismail, N. M.; Nor, N. M.; Ahmad, N.; Omar, M. F.; Termizi, A. A. A.; Zainal, D.; Noordin, N. M.; Mansor, S.

    2016-06-01

    Spatial information has introduced a new sense of urgency for a better understanding of the public needs in term of what, when and where they need services and through which devices, platform or physical locations they need them. The objective of this project is to value- add existing license management process for business premises which comes under the responsibility of Local Authority (PBT). Manipulation of geospatial and tracing technology via mobile platform allows enforcement officers to work in real-time, use a standardized system, improve service delivery, and optimize operation management. This paper will augment the scope and capabilities of proposed concept namely, Smart Licensing/Enforcement Management (SLEm). It will review the current licensing and enforcement practice of selected PBT in comparison to the enhanced method. As a result, the new enhanced system is expected to offer a total solution for licensing/enforcement management whilst increasing efficiency and transparency for smart city management and governance.

  14. Microbial ecology to manage processes in environmental biotechnology.

    Science.gov (United States)

    Rittmann, Bruce E

    2006-06-01

    Microbial ecology and environmental biotechnology are inherently tied to each other. The concepts and tools of microbial ecology are the basis for managing processes in environmental biotechnology; and these processes provide interesting ecosystems to advance the concepts and tools of microbial ecology. Revolutionary advancements in molecular tools to understand the structure and function of microbial communities are bolstering the power of microbial ecology. A push from advances in modern materials along with a pull from a societal need to become more sustainable is enabling environmental biotechnology to create novel processes. How do these two fields work together? Five principles illuminate the way: (i) aim for big benefits; (ii) develop and apply more powerful tools to understand microbial communities; (iii) follow the electrons; (iv) retain slow-growing biomass; and (v) integrate, integrate, integrate.

  15. Issues in the review of a license application for an above grade low-level radioactive waste disposal facility

    Energy Technology Data Exchange (ETDEWEB)

    Ringenberg, J.D. [Nebraska Dept. of Environmental Quality, NE (United States)

    1993-03-01

    In December 1987, Nebraska was selected by the Central Interstate Compact (CIC) Commission as the host state for the construction of a low-level radioactive waste disposal facility. After spending a year in the site screening process, the Compact`s developer, US Ecology, selected three sites for detailed site characterization. These sites were located in Nemaha, Nuckolls and Boyd Counties. One year later the Boyd County site was selected as the preferred site and additional site characterization studies were undertaken. On July 29, 1990, US Ecology submitted a license application to the Nebraska Department of Environmental Control (now Department of Environmental Quality-NDEQ). This paper will present issues that the NDEQ has dealt with since Nebraska`s selection as the host state for the CIC facility.

  16. Licensing of ANSTO's Replacement Research Reactor

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Garea, V.

    2003-01-01

    This paper presents a general description of the licensing of the 20 MW Pool-type Replacement Research Reactor (RRR) currently being built by the Australian Nuclear Science and Technology Organisation (ANSTO) at their Lucas Heights site. The following aspects will be addressed: 1) The influence of ARPANSA's (the Australian regulator) Regulatory Assessment Principles and Design Criteria on the design of the RRR. 2) The Site Licence Application, including the EIS and the supporting siting documentation. 3) The Construction Licence Application, including the PSAR and associated documentation. 4) The review process, including the IAEA Peer Review and the Public Submissions as well as ARPANSA's own review. 5) The interface between ANSTO, INVAP and ARPANSA in relation to the ongoing compliance with ARPANS Regulation 51 and 54. 6) The future Operating Licence Application, including the draft FSAR and associated documentation. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and how the licensing and regulatory regime within Australia influenced the design of the RRR. In particular, the safety design features that have been incorporated as a result of the specific requirements of ANSTO and the Australian regulator will be briefly described. The paper will close with a description of how the RRR meets, and in many aspects exceeds the requirements of ANSTO and the Australian regulator. (author)

  17. Trends in nuclear licensing

    Energy Technology Data Exchange (ETDEWEB)

    Dalton, N W [Council for Nuclear Safety, Hennopsmeer, Pretoria (South Africa)

    1990-06-01

    The development of nuclear safety and licensing is briefly reviewed in four stages namely: The Formative Period (1946-1959), The Expansive Period (1960-1969), The Mature Period (1970-1979) and the Apprehensive Period (1980-1989). Particular safety issues in the respective periods are highlighted to indicate the changing emphasis of nuclear licensing over the past thirty years or so. Against this background, nuclear licensing. (author)

  18. Trends in nuclear licensing

    International Nuclear Information System (INIS)

    Dalton, N.W.

    1990-01-01

    The development of nuclear safety and licensing is briefly reviewed in four stages namely: The Formative Period (1946-1959), The Expansive Period (1960-1969), The Mature Period (1970-1979) and the Apprehensive Period (1980-1989). Particular safety issues in the respective periods are highlighted to indicate the changing emphasis of nuclear licensing over the past thirty years or so. Against this background, nuclear licensing. (author)

  19. 78 FR 26813 - Request To Amend a License To Import Radioactive Waste

    Science.gov (United States)

    2013-05-08

    ... NUCLEAR REGULATORY COMMISSION Request To Amend a License To Import Radioactive Waste Pursuant to..., 2013, April 23, material (Class to a maximum the licensee name 2013, IW022/03, 11005700. A radioactive total of 5,500 from ``Perma-Fix waste). tons of low- Environmental level waste). Services, Inc.'' to...

  20. Department of Energy interest and involvement in nuclear plant license renewal activities

    International Nuclear Information System (INIS)

    Bustard, L.D.; Harrison, D.L.

    1991-01-01

    Recognizing the importance of nuclear license renewal to the nation's energy strategy, the Department of Energy (DOE) initiated a plant lifetime improvement program during 1985 to determine the feasibility of the license renewal option for US nuclear plants. Initial activities of the DOE program focused on determining whether there were technical and economic obstacles that might preclude or limit the successful implementation of the license renewal option. To make this determination, DOE cosponsored with the Electric Power Research Institute (EPRI) pilot-plant efforts by Virginia Electric Power and Northern States Power. Both pilot-plant efforts concluded that life extension is technically and economically feasible. In parallel with the pilot-plant activities, DOE performed national economic studies that demonstrated the economic desirability of life extension. Having demonstrated the feasibility of life extension, DOE, in conjunction with EPRI, selected two lead plants to demonstrate the license renewal process. These lead plants are Yankee Atomic's Yankee Rowe facility and Northern States Power's Monticello facility. DOE also initiated activities to develop the technical and regulatory bases to support the license renewal process in the United States. DOE has recently identified nuclear plant license renewal to be an important element of its National Energy Strategy. This paper summarizes the significant results, conclusions, and ongoing activities of the DOE effort. 18 refs

  1. Issues related to the licensing of final disposal facilities for radioactive waste

    International Nuclear Information System (INIS)

    Medici, M.A.; Alvarez, D.E.; Lee Gonzales, H.; Piumetti, E.H.; Palacios, E.

    2010-01-01

    The licensing process of a final disposal facility for radioactive waste involves the design, construction, pre-operation, operation, closure and post closure stages. While design and pre-operational stages are, to a reasonable extent, similar to other kind of nuclear or radioactive facilities, construction, operation, closure and post-closure of a radioactive waste disposal facility have unique meanings. As consequence of that, the licensing process should incorporate these particularities. Considering the long timeframes involved at each stage of a waste disposal facility, it is convenient that the development of the project being implemented in and step by step process, be flexible enough as to adapt to new requirements that would arise as a consequence of technology improvements or due to variations in the socio-economical and political conditions. In Argentina, the regulatory Standard AR 0.1.1 establishes the general guideline for the 'Licensing of Class I facilities (relevant facilities)'. Nevertheless, for radioactive waste final disposal facilities a new specific guidance should be developed in addition to the Basic Standard mentioned. This paper describes the particularities of final disposal facilities indicating that a specific licensing system for this type of facilities should be foreseen. (authors) [es

  2. Licensing arrangements and the development of the solar energy industry

    Energy Technology Data Exchange (ETDEWEB)

    Green, M.

    1979-06-01

    The process by which technology and information related to technology are transferred within industry is explored. Property rights in technology are part of the broader field of intellectual property. The general contours of legal protection for knowledge are explored. The four basic forms of intellectual property - patents, trade secrets (or know-how), trademarks, and copyrights - are covered in varying degrees of depth, depending on their relative applicability to the development of the solar industry. Once this background has been established, the legal aspects of licensing are examined. A license is a legal arrangement whereby a party (licensor) who controls the right to use an idea, invention, etc. shares the right to use the particular intellectual property with someone else (licensee). The advantages and disadvantages of licensing are described from the point of view of potential licensees and licensors. Barriers to licensing are discussed.

  3. Reformed and reforming: Adapting the licensing process to meet new challenges

    International Nuclear Information System (INIS)

    Burns, Stephen G.

    2017-01-01

    The NRC has engaged in a steady, albeit modest, examination of its preparedness for advanced designs over the past few years. These efforts have included examination of its own guidance and processes as well as co-operation with the US Department of Energy (US DOE) in identifying key issues and potential strategies. But the NRC is constrained in some respects from devoting substantial resources to the development of new or revised regulatory approaches due to statutory requirements that the NRC recover most of its appropriated funds through user fees imposed on the industry. Unless designers are prepared to put up the funds necessary to cover the fees for review of the new designs, the NRC is not able to review them, and licensees of operating facilities paying annual fees may not all be supportive of the NRC expending resources to develop infrastructure for the review of advanced reactor designs. Given the current context, this article will attempt to reflect on the NRC's current framework for licensing, the lessons from NRC's regulations in 10 CFR Part 52 and strategies for adapting to the new demands that may be made on the agency

  4. 10 CFR 72.34 - Environmental report.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report. 72.34 Section 72.34 Energy NUCLEAR..., and Contents § 72.34 Environmental report. Each application for an ISFSI or MRS license under this part must be accompanied by an Environmental Report which meets the requirements of subpart A of part...

  5. 76 FR 13973 - United States Warehouse Act; Processed Agricultural Products Licensing Agreement

    Science.gov (United States)

    2011-03-15

    ... security of goods in the care and custody of the licensee. The personnel conducting the examinations will..., Warehouse Operations Program Manager, FSA, United States Department of Agriculture, Mail Stop 0553, 1400... continuing compliance with the standards of approval and operation. FSA will conduct examinations of licensed...

  6. Environmental impact of solution mining for uranium

    International Nuclear Information System (INIS)

    Hunkin, G.G.

    1975-01-01

    Compared with most other mining systems, uranium solution mining has a negligible effect on such environmental factors as surface disturbance, interference with natural groundwater quality and distribution, and aerial discharge of radionuclides. The following topics are discussed: the process, personnel safety and health, tailings disposal, impact on groundwater, operating licenses and controls, legislation, and economics. It is concluded that engineered well systems and controlled input/production flow rates, combined with full recirculation systems that maintain constant fluid volumes in the mineralized formations, result in containment of leach solutions within the operating area. The very dilute leach solutions, compatible with natural groundwaters, ensure that no environmental damage results, even if a loss of control occurred. Reduction in the number of processing steps and virtual elimination of operator hazards, waste disposal and land rehabilitation costs help in reducing overall costs

  7. Selection/licensing of nuclear power plant operators

    International Nuclear Information System (INIS)

    Saari, L.M.

    1983-07-01

    An important aspect of nuclear power plant (NPP) safety is the reactor operator in the control room. The operators are the first individuals to deal with an emergency situation, and thus, effective performance on their part is essential for safe plant operations. Important issues pertaining to NPP reactor operators would fall within the personnel subsystem of our safety system analysis. While there are many potential aspects of the personnel subsystem, a key first step in this focus is the selection of individuals - attempting to choose individuals for the job of reactor operator who will safely perform the job. This requires a valid (job-related) selection process. Some background information on the Nuclear Regulatory Commission (NRC) licensing process used for selecting NPP reactor operators is briefly presented and a description of a research endeavor now underway at Battelle for developing a valid reactor operator licensing examination is included

  8. Lessons learned from the licensing process and the operational performance of the important to safety digital application implemented at the Mexican nuclear facilities

    International Nuclear Information System (INIS)

    Ledesma-Carrion, R.

    1998-01-01

    This paper describes the main concerns detected during the licensing processes performed by the Mexican Nuclear Regulatory Commission (CNSNS) for the NUMAC-PRNM, the Integrated Computer Systems at the Laguna Verde Nuclear Power Station (LVNPS) and for the Digital Control Console of the Triga Mark III Research Reactor (TMRR). The review and approval process was performed following the guidelines of the US Nuclear Regulatory Commission (USNRC); the regulatory frame applied includes the Code of Federal Regulation (10CFR50), some Regulatory Guides, such as: RG 1.152, RG 1.153, some Industrial Standards, for example: IEEE-279, IEEE-603, IEEE-7.4.3-2. Also, based on the operational experience taken from the LVNPS License Event Report (LER) reported under the 10CFR50.72 and 10CFR50.73 USNRC rules, and from the Report of Events to be Analyzed (REA) issued for a CNSNS agreement with the utility stated by the necessity to determine failure rates of digital equipment, some case studies and a preliminary failure cause classification is shown. The Event Report evaluation covered topics related to the software, hardware and firmware issues. Finally, the lessons learned from the licensing assessments and from the operational experience of the digital applications implemented are presented. It will also give the regulatory activities related to an IAEA international cooperation project on I and C digital upgrade concerns. (author)

  9. An overview of the licensing approach of the South African nuclear regulatory authority

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Hill, T.F.; Henderson, N.R.; Keenan, N.H.; Metcalf, P.E.; Mysenkov, A.

    1997-01-01

    This paper describes the approach adopted by the South African Nuclear Regulatory Authority, the Council for Nuclear Safety (CNS) in licensing nuclear installations in South Africa. An introduction to the current South African legislation and the CNS philosophy pertaining to the licensing of nuclear installations is discussed. A typical process for granting a nuclear licence is then presented. The risk assessment process, which is used to verify compliance with the fundamental safety standards and to establish licensing requirements for a specific nuclear installation, is discussed. Based on the outcome of this assessment process, conditions of licence are set down. The generic content of a nuclear licence and mechanisms to ensure ongoing compliance with the risk criteria are presented. The regulatory process discussed in this paper, based on such a fundamental approach, may be adapted to any type of nuclear installation taking into account plant specific designs and characteristics. (author)

  10. MARSSIM guidelines for non-impacted area identification in support of partial site release prior to license termination

    International Nuclear Information System (INIS)

    Parish, D.

    1999-01-01

    Regulations are in place which allow plants undergoing decommissioning to remove obsolete requirements from their licenses. Large buffer areas to the site boundary, needed for emergency planning purposes during power operation, are not required for permanently defueled facilities. It is important that non-impacted areas be removed from license restrictions as soon as possible post shutdown to allow rapid asset recovery and return the large environmental resources these areas represent to beneficial use. License termination surveys are not required for non-impacted areas in accordance with the guidance of US Nuclear Regulatory Commission (NRC) NUREG-1575 (MARSSIM), and NRC Draft Regulatory Guide DG-4006. Thus, such areas do not fall under the license termination requirements of 10CFR50.82 (US Code of Federal Regulations). This report describes methods of classifying areas as non-impacted in accordance with MARRSIM and other NRC guidance, and the licensing options for release of non-impacted areas prior to license termination. The status of Big Rock Point's efforts toward early release of non-impacted areas also is provided. (author)

  11. Final environmental impact statement for standards for the control of byproduct materials from uranium ore processing (40 CFR 192). Volume 1

    International Nuclear Information System (INIS)

    1983-09-01

    The Environmental Protection Agency is establishing public health and environmental standards (40 CFR 192) for uranium and thorium mill tailings at licensed mill sites under the Uranium Mill Tailings Radiation Control Act of 1978 (PL. 95-604). Mills are currently located in Colorado, New Mexico, South Dakota, Texas, Utah, Washington and Wyoming. These standards are issued to reduce and control the hazards associated with uranium and thorium mill Tailings. Controls are required both during the operational period of mills and for disposal of the tailings piles, to assure environmentally sound, long-term protection of public health and stabilization of the tailings

  12. The probabilistic approach and the deterministic licensing procedure

    International Nuclear Information System (INIS)

    Fabian, H.; Feigel, A.; Gremm, O.

    1984-01-01

    If safety goals are given, the creativity of the engineers is necessary to transform the goals into actual safety measures. That is, safety goals are not sufficient for the derivation of a safety concept; the licensing process asks ''What does a safe plant look like.'' The answer connot be given by a probabilistic procedure, but need definite deterministic statements; the conclusion is, that the licensing process needs a deterministic approach. The probabilistic approach should be used in a complementary role in cases where deterministic criteria are not complete, not detailed enough or not consistent and additional arguments for decision making in connection with the adequacy of a specific measure are necessary. But also in these cases the probabilistic answer has to be transformed into a clear deterministic statement. (orig.)

  13. Environmental assessment of remedial action at the Naturita Uranium Processing Site near Naturita, Colorado. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contain measures to control the contaminated materials and to protect groundwater quality. Remedial action at the Naturita site must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of Colorado. The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to either the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast, or a licensed non-DOE disposal facility capable of handling RRM. At either disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed Dry Flats disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. This report discusses environmental impacts associated with the proposed remedial action.

  14. Gas reactor international cooperative program interim report: United States/Federal Republic of Germany nuclear licensing comparison

    International Nuclear Information System (INIS)

    1978-09-01

    In order to compare US and FRG Nuclear Licensing, a summary description of United States Nuclear Licensing is provided as a basis. This is followed by detailed information on the participants in the Nuclear Licensing process in the Federal Republic of Germany (FRG). FRG licensing procedures are described and the rules and regulations imposed are summarized. The status of gas reactor licensing in both the U.S. and the FRG is outlined and overall conclusions are drawn as to the major licensing differences. An appendix describes the most important technical differences between US and FRG criteria

  15. The application of image processing software: Photoshop in environmental design

    Science.gov (United States)

    Dong, Baohua; Zhang, Chunmi; Zhuo, Chen

    2011-02-01

    In the process of environmental design and creation, the design sketch holds a very important position in that it not only illuminates the design's idea and concept but also shows the design's visual effects to the client. In the field of environmental design, computer aided design has made significant improvement. Many types of specialized design software for environmental performance of the drawings and post artistic processing have been implemented. Additionally, with the use of this software, working efficiency has greatly increased and drawings have become more specific and more specialized. By analyzing the application of photoshop image processing software in environmental design and comparing and contrasting traditional hand drawing and drawing with modern technology, this essay will further explore the way for computer technology to play a bigger role in environmental design.

  16. Preparing as an organization, to submit or to review a construction license application for a DGR of ILW and HLW in France. French National Case - Andra - Preparing to Submit Cigeo's Creation License Application

    International Nuclear Information System (INIS)

    Boissier, Fabrice; Labalette, T.; Leverd, Pascal C.; Voinis, Sylvie

    2014-01-01

    The reversible repository in a deep geological formation is the French reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. Since the first French Act on nuclear waste management research (1991), Andra has carried out twenty years of conceptual and basic studies on the subject, leading in particular to the feasibility demonstration in 2005 and to the choice of the detailed reconnaissance zone (ZIRA) in 2010. Taking advantage from this work, Andra has now reached a new phase where the project is engaging in the design of the industrial installation named Cigeo. At this stage, the further development of the project implies that Andra undertakes a multiplicity of actions in order to successfully reach various external and internal key milestones. Of paramount importance is the careful articulation between the regulatory authorization and decision processes and the outcome of the industrial installation design phases. In 2006 was built a regulatory framework that plans a succession of step by step decisions stages: 2013: Public debate on reversibility, memory keeping, environmental and health survey modalities, dialogue with the local stakeholders to harmoniously define and plan the external infrastructures that have to be developed to support the construction and the operation of Cigeo (roads, railway tracks and terminal, power and water supplies, etc.). 2015: Creation license application and start of the regulatory review process (notably various plans of the installation, the description of the solution envisaged for the closure of the facility, the preliminary safety case (operational safety, long-term safety, protection against malevolent actions, management of incidental situations, preliminary acceptance criteria), environmental impact studies (health, salubrity, transports, human activities, nature, patrimonial aspects). 2016-2017: new parliamentary Act on the reversibility conditions of the

  17. Graduated driver licensing and differential deterrence: The effect of license type on intentions to violate road rules.

    Science.gov (United States)

    Poirier, Brigitte; Blais, Etienne; Faubert, Camille

    2018-01-01

    In keeping with the differential deterrence theory, this article assesses the moderating effect of license type on the relationship between social control and intention to violate road rules. More precisely, the article has two objectives: (1) to assess the effect of license type on intentions to infringe road rules; and (2) to pinpoint mechanisms of social control affecting intentions to violate road rules based on one's type of driver license (a restricted license or a full license). This effect is examined among a sample of 392 young drivers in the province of Quebec, Canada. Drivers taking part in the Graduated Driver Licensing (GDL) program have limited demerit points and there is zero tolerance for drinking-and-driving. Propensity score matching techniques were used to assess the effect of the license type on intentions to violate road rules and on various mechanisms of social control. Regression analyses were then conducted to estimate the moderating effect of license type. Average treatment effects from propensity score matching analyses indicate that respondents with a restricted license have lower levels of intention to infringe road rules. While moral commitment and, to a lesser extent, the perceived risk of arrest are both negatively associated with intentions to violate road rules, the license type moderates the relationship between delinquent peers and intentions to violate road rules. The effect of delinquent peers is reduced among respondents with a restricted driver license. Finally, a diminished capability to resist peer pressure could explain the increased crash risk in months following full licensing. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. IRIS Licensing Status

    International Nuclear Information System (INIS)

    Kling, Charles L.; Carelli, Mario D.

    2006-01-01

    The International Reactor Innovative and Secure (IRIS) nuclear power plant is well into the pre-application review process with the US NRC and has accomplished its first near term goal of obtaining US NRC feedback on the long term testing program. To date, the IRIS team has submitted to the US NRC a number of documents patterned after the Evaluation Model Development and Assessment Process (EMDAP) outlined in Regulatory Guide 1,203. They have covered a detailed description of IRIS, initial safety analysis results, PIRT development for limiting transients, scaling analysis and a description of the test program. The IRIS Safety-by-Desing TM intrinsically eliminates and/or significantly reduces the consequences of traditional LWR accidents. In addition, the fewer passive safety systems are similar in principle to those of the US NRC approved AP1000 design. For these reasons, the IRIS testing program only needs to include those features unique to the IRIS design. NRC feedback was that the planned test program appeared to be complete and could generate sufficient information to support a Design Certification (DC) submittal. The US NRC has also stated that a DC application must include complete information regarding the test program. On this basis the IRIS team has initiated an aggressive program to conduct IRIS testing to support a DC submittal by the end of 2008. Subsequent US NRC review should be expeditious because of the AP1000 precedent, allowing IRIS to obtain its Final Design Approval (FDA) in 2012; thereby, maintaining its goal of deployment in the 2015-2017 time frame. The next steps in the pre-application review process will be to provide the US NRC with a road map of the anticipated IRIS licensing process, a review of current licensing requirements showing that IRIS meets or exceeds all current criteria and information to support the long term goal of redefining the Emergency Planning Zone (EPZ)

  19. 5th Conference on Aerospace Materials, Processes, and Environmental Technology

    Science.gov (United States)

    Cook, M. B. (Editor); Stanley, D. Cross (Editor)

    2003-01-01

    Records are presented from the 5th Conference on Aerospace Materials, Processes, and Environmental Technology. Topics included pollution prevention, inspection methods, advanced materials, aerospace materials and technical standards,materials testing and evaluation, advanced manufacturing,development in metallic processes, synthesis of nanomaterials, composite cryotank processing, environmentally friendly cleaning, and poster sessions.

  20. Gunnar uranium mine environmental remediation - Northern Saskatchewan

    Energy Technology Data Exchange (ETDEWEB)

    Muldoon, Joe; Yankovich, Tamara; Schramm, Laurier L. [Saskatchewan Research Council, Saskatoon, SK (Canada)

    2013-07-01

    The Gunnar Mine and mill site was the largest of some 38 now-abandoned uranium mines that were developed and operated in Northern Saskatchewan, Canada, during the Cold War years. During their operating lifetimes these mines produced large quantities of ore and tailings. The Gunnar mine (open pit and underground) produced over 5 million tonnes of uranium ore and nearly 4.4 million tonnes of mine tailings during its operations from 1955 through 1963. An estimated 2.2 to 2.7 million m{sup 3} of waste rock that was generated during the processing of the ore abuts the shores of Lake Athabasca, the 22. largest lake in the world. After closure in the 1960's, the Gunnar site was abandoned with little to no decommissioning being done. The Saskatchewan Research Council has been contracted to manage the clean-up of these abandoned northern uranium mine and mill sites. The Gunnar Mine, because of the magnitude of tailings and waste rock, is subject to an environmental site assessment process regulated by both provincial and federal governments. This process requires a detailed study of the environmental impacts that have resulted from the mining activities and an analysis of projected impacts from remediation efforts. The environmental assessment process, specific site studies, and public involvement initiatives are all now well underway. Due to the many uncertainties associated with an abandoned site, an adaptive remediation approach, utilizing a decision tree, presented within the environmental assessment documents will be used as part of the site regulatory licensing. A critical early task was dealing with major public safety hazards on the site. The site originally included many buildings that were remnants of a community of approximately 800 people who once occupied the site. These buildings, many of which contained high levels of asbestos, had to be appropriately abated and demolished. Similarly, the original mine head frame and mill site buildings, many of which

  1. Establishing a safety and licensing basis for generation IV advanced reactors. License by test

    International Nuclear Information System (INIS)

    Kadak, Andrew C.

    2001-01-01

    The license by test approach to licensing is a novel method of licensing reactors. It provides an opportunity to deal with innovative non-water reactors in a direct way on a time scale that could permit early certification based on tests of a demonstration reactor. The uncertainties in the design and significant contributors to risk would be identified in the PRA during the design. Deterministic analysis computer codes could be tested on a real reactor. Scaling effects and associated uncertainties would be minimized. License by test is an approach that has sufficient merit to be developed and tested

  2. 22 CFR 96.30 - State licensing.

    Science.gov (United States)

    2010-04-01

    ... Licensing and Corporate Governance § 96.30 State licensing. (a) The agency or person is properly licensed or... person follows applicable State licensing and regulatory requirements in all jurisdictions in which it provides adoption services. (c) If it provides adoption services in a State in which it is not itself...

  3. Final environmental statement for La Crosse Boiling Water Reactor: (Docket No. 50-409)

    International Nuclear Information System (INIS)

    1980-04-01

    A Final Environmental Statement for the Dairyland Power Cooperative for the conversion from a provisional to a full-term operating license for the La Crosse Boiling Water Reactor, located in Vernon County, Wisconsin, has been prepared by the Office of Nuclear Reactor Regulation. This statement provides a summary of environmental impacts and adverse effects of operation of the facility, and a consideration of principal alternatives (including removal of LACBWR from service, alternative cooling methodology, and alternative waste treatment systems). Also included are the comments of federal, state, and local governmental agencies and certain non-governmental organizations on the La Crosse Draft Environmental Statement and staff responses to these comments. After weighing environmental, economic, and technical benefits and liabilities, the staff recommends conversion from a provisional operating license to a full-term operating license, subject to specific environmental protection limitations. An operational monitoring program shall be established as part of the Environmental Technical Specifications. 64 refs., 20 figs., 48 tabs

  4. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  5. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-05-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  6. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-01-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  7. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-03-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  8. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-11-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  9. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-10-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  10. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  11. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-09-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  12. The Center for Environmental Technology Innovative Technology Screening Process

    International Nuclear Information System (INIS)

    Bertrand, C.M.

    1995-02-01

    The Center for Environmental Technology's (CET) mission is to provide a fully integrated system for accelerated evaluation, development, commercialization, and public acceptance of creative environmental solutions which match the foremost demands in today's environmentally sensitive world. In short, CET will create a means to provide quick, effective solutions for environmental needs. To meet this mission objective, CET has created a unique and innovative approach to eliminating the usual barriers in developing and testing environmental technologies. The approach paves the way for these emerging, cutting-edge technologies by coordinating environmental restoration and waste management activities of industry, universities, and the government to: efficiently and effectively transfer technology to these users, provide market-driven, cost-effective technology programs to the public and DOE, and aid in developing innovative ideas by initiating efforts between DOE facilities and private industry. The central part to this mission is selecting and evaluating specific innovative technologies for demonstration and application at United States Department of Energy (DOE) installations. The methodology and criteria used for this selection, which is called the CET Innovative Technology Screening Process, is the subject of this paper. The selection criteria used for the screening process were modeled after other DOE technology transfer programs and were further developed by CET's Technology Screening and Evaluation Board (TSEB). The process benefits both CET and the proposing vendors by providing objective selection procedures based on predefined criteria. The selection process ensures a rapid response to proposing vendors, all technologies will have the opportunity to enter the selection process, and all technologies are evaluated on the same scale and with identical criteria

  13. Licensing in an International Market

    Science.gov (United States)

    Ferreira, Fernanda A.

    2008-09-01

    We study the effects of entry of a foreign firm on domestic welfare in the presence of licensing, when the entrant is technologically superior to the incumbent. We show that foreign entry increases domestic welfare for sufficiently large technological differences between the firms under both fixed-fee licensing and royalty licensing.

  14. 22 CFR 120.20 - License.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false License. 120.20 Section 120.20 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS PURPOSE AND DEFINITIONS § 120.20 License. License means a document bearing the word “license” issued by the Directorate of Defense Trade...

  15. Final Environmental Impact Statement to construct and operate the Crownpoint Uranium Solution Mining Project, Crownpoint, New Mexico

    International Nuclear Information System (INIS)

    1997-02-01

    This Final Environmental Impact Statement (FEIS) addresses the proposed action of issuing a combined source and 11e(2) byproduct material license and minerals operating leases for Federal and Indian lands to Hydro Resources, Inc. (HRI). This action would authorize HRI to conduct in-situ leach uranium mining in McKinley County, New Mexico. Such mining would involve drilling wells to access the ore bodies, then recirculating groundwater with added oxygen to mobilize uranium found in the ore. Uranium would then be removed from the solution using ion exchange technology in processing plants located at three separate sites. As proposed by HRI, a central plant would provide drying and packaging equipment for the entire project. The Draft Environmental Impact Statement (DEIS) for the proposed action was prepared by an interagency review group comprising staff from the Nuclear Regulatory Commission, the Bureau of Indian Affairs, and the Bureau of Land Management, and published in October 1994. After evaluating the environmental impacts of the proposed action in the DEIS, the reviewing agencies concluded that the appropriate action was to issue the requested license and proposed leases authorizing HRI to proceed with the project. This FEIS reevaluates the proposed licensing action on the basis of written and oral comments received on the DEIS and on additional information obtained in 1995 and 1996. The FEIS describes and evaluates (1) the purpose of and need for the proposed action, (2) alternatives to the proposed action, (3) the environmental resources that could be affected by the proposed action and alternatives, (4) the potential environmental consequences of the proposed action and alternatives, and (5) the economic costs and benefits associated with the proposed action. Based on this assessment, the FEIS makes recommendations concerning the requested license and proposed leases

  16. National Environmental Policy Act guidance: A model process

    International Nuclear Information System (INIS)

    Angle, B.M.; Lockhart, V.A.T.; Sema, B.; Tuott, L.C.; Irving, J.S.

    1995-04-01

    The ''Model National Environmental Policy Act (NEPA) Process'' includes: References to regulations, guidance documents, and plans; training programs; procedures; and computer databases. Legislative Acts and reference documents from Congress, US Department of Energy, and Lockheed Idaho Technologies Company provide the bases for conducting NEPA at the Idaho National Engineering Laboratory (INEL). Lockheed Idaho Technologies Company (LITCO) NEPA / Permitting Department, the Contractor Environmental Organization (CEO) is responsible for developing and maintaining LITCO NEPA and permitting policies, guidance, and procedures. The CEO develops procedures to conduct environmental evaluations based on NEPA, Council on Environmental Quality (CEQ) regulations, and DOE guidance. This procedure includes preparation or support of environmental checklists, categorical exclusion determinations, environmental assessment determinations, environmental assessments, and environmental impact statements. In addition, the CEO uses this information to train personnel conducting environmental evaluations at the INEL. Streamlining these procedures fosters efficient use of resources, quality documents, and better decisions on proposed actions

  17. 48 CFR 227.7203-4 - License rights.

    Science.gov (United States)

    2010-10-01

    ... Software and Computer Software Documentation 227.7203-4 License rights. (a) Grant of license. The... license, under an irrevocable license granted or obtained by the contractor which developed the software... granted to the Government. The scope of a computer software license is generally determined by the source...

  18. Technology Licensing and Firm Innovation

    DEFF Research Database (Denmark)

    Moreira, Solon

    acquisition. The findings indicate that technology licensing is positively related to the number of inventions produced by the licensee in the years subsequent to the licensing deal. Subsequently, I investigate the moderating effect that organizational slack and myopia have on this main relationship....... The findings also suggest that high levels of Organizational Slack (available financial resources) strengthen the positive effect of licensing on innovation. However, higher levels of Organizational Myopia (the extent to which a firm draws on its own knowledge) can decrease the main effect of licensing....

  19. 31 CFR 596.309 - Specific license.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.309 Specific license. The term specific license means any license or...

  20. Online driver's license renewal.

    Science.gov (United States)

    2015-09-01

    The Kentucky Department of Vehicle Regulation is exploring the possibility of developing and implementing online : drivers license renewal. The objective of this project was to: 1) evaluate online drivers license and REAL ID renewal : programs ...

  1. Joint stock company memorandum of association and environmental protection

    Directory of Open Access Journals (Sweden)

    Arsić Zoran

    2012-01-01

    Full Text Available Joint stock company memorandum of association and environmental protection 2011 Company Act stipulates that prevailing purpose of enterprise is mandatory element of memorandum of association. Connection between memorandum of association and environmental protection is based on provision that registration or doing certain business may be subject to license granted by relevant body. This is the case with 2009 Waste Management Act which provides for license granted by state authorities for doing one or more activities in waste management.

  2. The need for legislative framework (licensing)

    International Nuclear Information System (INIS)

    Krech, H.

    1977-01-01

    For reasons of public acceptance the basis of a licensing system should be laid down in a law, details can be fixed in regulations below the law-level. The competence for licensing nuclear installations should be attributed to one body, which is not a the same time charged with the promotion of nuclear energy. The licensing authority has to be provided with sufficient technical advice, given by experts organized in advisory bodies. Normally a licensing procedure is split into several steps (site approval, construction permit, operation licence), each step can be subdivided. Some general aspects of licensing conditions (personal, technical and financial) as well as of the licensing procedure are outlined. The participation of the public is of particular importance but also involves most intricate problems. The paper concludes with some critical remarks on the role of administrative courts with respect to the licensing of nuclear power plants. (orig.) [de

  3. 31 CFR 596.305 - General license.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.305 General license. The term general license means any license or authorization...

  4. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  5. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  6. Licensing review process of the European Spallation Source (ESS) research facility

    International Nuclear Information System (INIS)

    Brewitz, Erica

    2014-01-01

    On 3 January 2012 a license application under the Radiation Protection Act (SFS, 1988b) for the European Spallation Source research facility was submitted to the Swedish Radiation Safety Authority. The European Spallation Source research facility will be the site of a new and quite unusual kind of neutron source, based on a large proton accelerator that bombards a heavy material with protons. The Swedish Radiation Safety Authority is now reviewing the application. (authors)

  7. Technology Transfer Center to Assume Patenting and Licensing Responsibilities | Poster

    Science.gov (United States)

    The NCI Technology Transfer Center (TTC) is undergoing a reorganization that will bring patenting and licensing responsibilities to the Shady Grove and Frederick offices by October 2015. The reorganization is a result of an effort begun in 2014 by NIH to improve the organizational structure of technology transfer at NIH to meet the rapid rate of change within science, technology, and industry, and to better align the science and laboratory goals with the licensing and patenting process.

  8. Environmentally benign chemical synthesis and processing

    International Nuclear Information System (INIS)

    Hancock, K.G.

    1992-01-01

    A new era of university-industry-government partnership is required to address the intertwined problems of industrial economic competitiveness and environmental quality. Chemicals that go up the stacks and down the drains are simultaneously a serious detriment to the environment, a waste of natural resources, and a threat to industrial profitability. Recently, the NSF Divisions of Chemistry and chemical and Thermal Systems have joined with the Council for Chemical research in a new grant program to reduce pollution at the source by underwriting research aimed at environmentally benign chemical synthesis and processing. Part of a broader NSF initiative on environmental science research, this new program serves as a model for university-industry-government joint action and technology transfer. Other features of this program and related activities will be described in this paper

  9. The regulator's stake in a multi-stakeholder process

    International Nuclear Information System (INIS)

    Jensen, Mikael; Larsson, Carl-Magnus; Norrby, Soeren; Westerlind, Magnus

    1999-01-01

    The siting of a repository for spent nuclear fuel poses a number of challenges to a broad range of stakeholders, e.g. implementers, regulators, potential host municipalities, environmental groups, political decision-makers on different levels and the public. This paper presents some regulatory challenges as experienced and approached by the Swedish regulators most involved in nuclear waste management (the Swedish Radiation Protection Institute, SSI, and the Swedish Nuclear Power Inspectorate, SKI). First the regulatory framework is outlined with emphasis on decision-making processes and environmental impact assessment. Then a short background is given to the current status of the ongoing programme for repository siting. The main part of the paper discusses some conclusions from the so-called RISCOM pilot project, which was concluded in 1998. The paper also contains some findings from other projects as well as some experiences from the ongoing siting process. It is important to have independent regulators, with the capacity to review the safety assessment of the implementer. The regulators also have the challenging task to be people's experts in stretching the implementer. At the same time they should expose themselves to the being stretched by other stakeholders and the public at large. Experience also shows that regulators should engage early in the pre-licensing phase, e.g. in EIA and siting, and that this can be done without compromising the independence and integrity needed in the licensing phase. The regulator must be present at all levels, and observant of the participants' different needs and roles played on the national, regional and local level. A well structured, but flexible, EIA appear to be an efficient 'vehicle' for public participation. However, it is believed that the EIA should be complemented with hearings, in both the pre-licensing and licensing phases, since this is believed to increase the transparency of the decision making process. Such

  10. The regulatory review of construction license application and the supporting safety case

    International Nuclear Information System (INIS)

    Heinonen, Jussi

    2014-01-01

    Finland is one of the foremost countries in the world in developing the disposal of spent fuel. The construction license application for the Olkiluoto spent fuel disposal facility was submitted to the authorities at the end of 2012 and the facility is expected to start operation around 2020. This has been a long-term project with over 30 years of parallel development of the repository project and the regulatory approach to spent fuel management. In 1983 the government made a strategic decision on the objectives and target time schedule for the research, development and technical planning of nuclear waste management. While an export and international disposal solution was still the preferred option, this decision required the licensees without this possibility to prepare for disposal in Finland and it also gave the time line for the milestones on the way to an operating disposal facility by 2020. The licensing procedure for a disposal facility has several steps that are similar to all nuclear facilities in Finland and are defined in Nuclear Energy Act and Decree (1987, 1988). These licensing steps are: - Decision-in-principle is required for a nuclear facility having considerable general significance. This is essentially a political decision: the government decides if the construction project is in line with the overall good of society. The decision can be applied for one or more sites, the host municipality has a veto right and the parliament has the choice of ratifying or not ratifying the decision. - Construction license is granted by the government and authorises the construction of the disposal facility. The actual construction is regulated by STUK and includes several review and approval steps, hold points and viewpoints. - Operational license is granted by the government and authorises the operation of the facility for a certain period. The operational license is needed before nuclear waste can be disposed. The first step in the licensing process was reached

  11. Licensing an assured isolation facility for low-level radioactive waste. Volume 1: Licensing strategy and issues

    International Nuclear Information System (INIS)

    Silverman, D.J.; Bauser, M.A.; Baird, R.D.

    1998-07-01

    This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application

  12. EMPIRICAL STUDY OF CAR LICENSE PLATES RECOGNITION

    Directory of Open Access Journals (Sweden)

    Nasa Zata Dina

    2015-01-01

    Full Text Available The number of vehicles on the road has increased drastically in recent years. The license plate is an identity card for a vehicle. It can map to the owner and further information about vehicle. License plate information is useful to help traffic management systems. For example, traffic management systems can check for vehicles moving at speeds not permitted by law and can also be installed in parking areas to se-cure the entrance or exit way for vehicles. License plate recognition algorithms have been proposed by many researchers. License plate recognition requires license plate detection, segmentation, and charac-ters recognition. The algorithm detects the position of a license plate and extracts the characters. Various license plate recognition algorithms have been implemented, and each algorithm has its strengths and weaknesses. In this research, I implement three algorithms for detecting license plates, three algorithms for segmenting license plates, and two algorithms for recognizing license plate characters. I evaluate each of these algorithms on the same two datasets, one from Greece and one from Thailand. For detecting li-cense plates, the best result is obtained by a Haar cascade algorithm. After the best result of license plate detection is obtained, for the segmentation part a Laplacian based method has the highest accuracy. Last, the license plate recognition experiment shows that a neural network has better accuracy than other algo-rithm. I summarize and analyze the overall performance of each method for comparison.

  13. A vision for environmentally conscious plutonium processing

    International Nuclear Information System (INIS)

    Avens, L.R.; Eller, P.G.; Christensen, D.C.; Miller, W.L.

    1998-01-01

    Regardless of individual technical and political opinions about the uses of plutonium, it is virtually certain that plutonium processing will continue on a significant global scale for many decades for the purposes of national defense, nuclear power, and remediation. An unavoidable aspect of plutonium processing is that radioactively contaminated gas, liquid, and solid waste streams are generated. These streams need to be handled in a manner that not only is in full compliance with today's laws but also will be considered environmentally and economically responsible now and in the future. In this regard, it is indeed ironic that the multibillion dollar and multidecade radioactive cleanup mortgage that the US Department of Energy (and its Russian counterpart) now owns resulted from waste management practices that were at the time in full legal compliance. It is now abundantly evident that in the long run, these practices have proven to be neither environmentally nor economically sound. Recent dramatic advances in actinide science and technology now make it possible to drastically minimize or even eliminate the problematic waste streams of traditional plutonium processing operations. Advanced technology thereby provides the means to avoid passing on to children and grandchildren significant environmental and economic legacies that traditional processing inevitably produces. The authors describe such a vision for plutonium processing that could be implemented fully within 5 yr at a facility such as the Los Alamos National Laboratory Plutonium Facility (TA55). As a significant bonus, even on this short timescale, the initial technology investment is handsomely returned in avoided waste management costs

  14. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis

  15. AGING MANAGMENT OF REACTOR COOLANT SYSTEM MECHANICAL COMPONENTS FOR LICENSE RENEWAL

    International Nuclear Information System (INIS)

    SUBUDHI, M.; MORANTE, R.; LEE, A.D.

    2002-01-01

    The reactor coolant system (RCS) mechanical components that require an aging management review for license renewal include the primary loop piping and associated connections to other support systems, reactor vessel, reactor vessel internals, pressurizer. steam generators, reactor coolant pumps, and all other inter-connected piping, pipe fittings, valves, and bolting. All major RCS components are located inside the reactor building. Based on the evaluation findings of recently submitted license renewal applications for pressurized water reactors, this paper presents the plant programs and/or activities proposed by the applicants to manage the effects of aging. These programs and/or activities provide reasonable assurance that the intended function(s) of these mechanical components will be maintained for the period of extended operation. The license renewal application includes identification of RCS subcomponents that are within the scope of license renewal and are vulnerable to age-related degradation when exposed to environmental and operational conditions. determination of the effects of aging on their intended safety functions. and implementation of the aging management programs and/or activities including both current and new programs. Industry-wide operating experience, including generic communication by the NRC, is part of the aging management review for the RCS components. In addition, this paper discusses time-limited aging analyses associated with neutron embrittlement of the reactor vessel beltline region and thermal fatigue

  16. Discovering Software License Constraints : Identifying a Binary’s Sources by Tracing Build Processes

    NARCIS (Netherlands)

    Van der Burg, S.; Davies, J.; Dolstra, E.; German, D.M.; Hemel, A.

    2012-01-01

    With the current proliferation of open source software components, intellectual property in general, and copyright law in particular, has become a critical non-functional requirement for software systems. A key problem in license compliance engineering is that the legal constraints on a product

  17. Licensing and safety of nuclear power plants in Canada

    International Nuclear Information System (INIS)

    Boyd, F.C.

    1981-09-01

    An overview of the regulatory framework and licensing process for nuclear power plants in Canada is given along with an outline of the evolution of the safety philosophy followed and some comments on how this philosophy and process could be applied by a country embarking on a nuclear power program

  18. 76 FR 71082 - Strata Energy, Inc., Ross Uranium Recovery Project; New Source Material License Application...

    Science.gov (United States)

    2011-11-16

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 40-9091; NRC-2011-0148] Strata Energy, Inc., Ross Uranium Recovery Project; New Source Material License Application; Notice of Intent To Prepare a... intent to prepare a supplemental environmental impact statement. SUMMARY: Strata Energy, Inc. (Strata...

  19. Managing Licensing in a Market for Technology

    DEFF Research Database (Denmark)

    Arora, Ashish; Rønde, Thomas; Fosfuri, Andrea

    the technology makes licensing decisions—to centralized licensing. The business unit has superior information about licensing opportunities but may not have the appropriate incentives because its rewards depend upon product market performance. If licensing is decentralized, the business unit forgoes valuable...... licensing opportunities since the rewards for licensing are (optimally) weaker than those for product market profits. This distortion is stronger when production-based incentives are more powerful, making centralization more attractive. Growth of technology markets favors centralization and drives higher...

  20. Simultaneous environmental and economic process synthesis of Isobutane Alkylation

    OpenAIRE

    García, Norberto; Fernandez-Torres, Maria J.; Caballero, José A.

    2014-01-01

    This multidisciplinary study concerns the optimal design of processes with a view to both maximizing profit and minimizing environmental impacts. This can be achieved by a combination of traditional chemical process design methods, measurements of environmental impacts and advanced mathematical optimization techniques. More to the point, this paper presents a hybrid simulation-multiobjective optimization approach that at once optimizes the production cost and minimizes the associated environm...

  1. 15 CFR 970.506 - Environmental effects.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Environmental effects. 970.506 Section... Environmental effects. Before issuing or transferring an exploration license, the Administrator must find that... adverse effect on the quality of the environment, taking into account the analyses and information in any...

  2. 78 FR 21930 - Aquenergy Systems, Inc.; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2013-04-12

    ... Systems, Inc.; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License...: November 11, 2012. d. Submitted by: Aquenergy Systems, Inc., a fully owned subsidiaries of Enel Green Power...

  3. Role of Slovak Environmental Agency in EIA process

    International Nuclear Information System (INIS)

    Kristofova, I.; Suchova, K.; Hrncarova, M.

    2003-01-01

    The Slovak Environmental Agency (SEA) is a scientific organisation of the Ministry of the Environment of the Slovak Republic, operating on the whole territory of Slovakia. Its activities are focused on the improvement and protection of the environment on the principles of sustainable development. SEA performs the environmental impact assessment on the basis of the Ministry of the Environment of the Slovak Republic request. SEA superintends EIA Documentary Center in Banska Bystrica. Environmental Impact Assessment (SEA) creates and operates the EIA information system SEA provides consulting in EIA process and gives seminar meetings and training in EIA field. SEA elaborates the preliminary environmental study and the environmental impact statement on the basis of investor request. (authors)

  4. Regulatory systems-based licensing guidance documentation

    International Nuclear Information System (INIS)

    Delligatti, M.S.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) has developed a series of licensing guidance documents based on the regulatory requirements in Part 60 of Title 10 of the Code of Federal Regulations (10 CFR Part 60). This regulatory systems-based approach to licensing guidance documentation relies on the definition of the high-level waste repository in 10 CFR Part 60. A document which is important for the frame-work it gives to other programmatic licensing guidance is the Draft Regulatory Guide open-quotes Format and Content for the License Application for the High-Level Waste Repositoryclose quotes (FCRG). The FCRG describes a format and content acceptable to NRC for a high-level waste repository license application pursuant to the requirements of 10 CFR Part 60. Other licensing guidance documents will be compatible with the FCRG

  5. Managing environmental knowledge through learning processes in Spanish hospitality companies.

    Science.gov (United States)

    Cegarra-Navarro, Juan Gabriel; Martinez Martinez, Aurora

    2010-11-01

    The major focus of this research is to investigate whether environmental knowledge has any impact on organizational outcomes through an empirical investigation of 127 Spanish hospitality companies, using structural equation models. Our results show that environmental knowledge is an important determiner for developing organizational outcomes. However, this relationship is completed with just two related constructs: Firstly, the company's acquisition process plays a key role in managing the tension between the knowledge necessary to develop the appropriated environmental initiatives and current knowledge. Secondly, the company's distribution process also sheds light on tangible means for managers to enhance their company's outcomes through environmental knowledge.

  6. Methodology for LOCA analysis and its qualification procedures for PWR reload licensing

    International Nuclear Information System (INIS)

    Serrano, M.A.B.

    1986-01-01

    The methodology for LOCA analysis developed by FURNAS and its qualification procedure for PWR reload licensing are presented. Digital computer codes developed by NRC and published collectively as the WREM package were modified to get versions that comply to each requirement of Brazilian Licensing Criteria. This metodology is applied to Angra-1 basic case to conclude the qualification process. (Author) [pt

  7. Improving regulatory effectiveness in federal/state siting actions: water supplies and the nuclear licensing process

    International Nuclear Information System (INIS)

    Davenport, F.S.

    1977-07-01

    The Interstate Conference on Water Problems (ICWP) is a national association of State, intrastate, and interstate officials concerned with water resources administration and related matters. The Conference was established in 1959 as an outgrowth of regional conferences on water problems as recognized in the same year by action of the General Assembly of the States. This report was produced by the Interstate Conference on Water Problems in an effort to provide a compilation and summary of the views of selected States regarding relationships of water supplies to the nuclear power plant licensing process. This publication does not represent the official position of the U.S Water Resources Council, or the U.S. Nuclear Regulatory Commission, nor does it represent the position of any single state or the ICWP

  8. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Science.gov (United States)

    2010-01-01

    ... environmental effects. 970.702 Section 970.702 Commerce and Foreign Trade Regulations Relating to Commerce and... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an...

  9. 10 CFR 51.81 - Distribution of draft environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...

  10. License to Learn

    DEFF Research Database (Denmark)

    Leone, Maria Isabella; Boccardelli, Paolo; Reichstein, Toke

    2016-01-01

    the technology. Drawing on a sample of 133 licensees and an equal number of matched nonlicensees, we present empirical evidence that thick contracts propel the licensees' likelihood of introducing new inventions. It is also found that thick contracts act as a substitute for licensees' absorptive capacity....... Licensees that are more familiar with the licensed technology are in less need of assistance from the licensors to assimilate and integrate the knowledge. However, this substitution effect is neutralized once the hurdle of invention has been overcome, meaning that the licensees have succeeded to ignite...... the invention process, suggesting the exploitation of the learning curve, triggered by their mutual understanding....

  11. Delivering Regulatory Consents for Decommissioning and Restoration of the Dounreay Nuclear Licensed Site

    International Nuclear Information System (INIS)

    Crawford, R.W.; Zyda, P.W.

    2006-01-01

    On behalf of the Nuclear Decommissioning Authority (NDA) the United Kingdom Atomic Energy Authority (UKAEA) has implemented a strategy to translate the near-term Dounreay restoration plan into a suite of land use documents designed to deliver the necessary planning consents to decommission and restore the Dounreay Nuclear Licensed Site. The legal consents and authorizations required to enable UKAEA to commence major projects and progress the decommissioning of the site are highlighted along with the measures taken to secure political, public and regulatory acceptance at the earliest opportunity. The approach taken by UKAEA is explained, focusing particularly on the critical need to secure planning permission and stakeholder approval well before the onset of construction works. The intention is to realize the benefits of forging a close working relationship with the land use regulator, The Highland Council. UKAEA has taken an approach to suitably inform the planning authority, in particular, the production of the Dounreay Planning Framework (DPF) document. This paper describes the role and need for the DPF, focusing on the key purpose of amending the local development plan to secure supportive planning policies and to set a land use context for the subsequent site decommissioning and restoration. This also has the advantage of securing public acceptance through an established legal process. Strategic milestones subsequent to the Highland Council's adoption of the DPF are highlighted, including the submission of phased planning applications and compliance with environmental legislation generally. The paper describes and underscores the need for early engagement of other regulators in the planning process such as the Scottish Environment Protection Agency (SEPA), and the safety regulator, the Nuclear Installations Inspectorate (NII). It describes the linkages amongst land use consents, Best Practicable Environmental Options (BPEO), radioactive substances

  12. Licensing requirements for initial commissioning programs in Spain: Application to different PWR designs

    International Nuclear Information System (INIS)

    Munuera, A.; Conde, J.M.; Martinez, J.

    1991-01-01

    This paper describes the overall licensing process in Spain, focusing on the initial commissioning requirements. The significance of this part of the regulatory work is evident both from the licensing and the licensee's points of view. Licensing in Spain is ruled by different laws which determine the general requirements and fix the licensing frame. Being a nuclear technology importer country, the base of the regulatory work lies on the rules and regulations of the country of origin of the planet, with the addition of case specific requirements. The application of this methodology to plants designed in different countries produces licensing processes which are similar to the overall, but very different in its development. It also means a special technical effort on the part of the regulatory body to cope with the problems arising from the use of different technologies and safety standards. The start-up programs from fuel loading to full power of a Westinghouse plant (Vandellos 2) and a Siemens-KWU plant (Trillo 1) are compared from the technical point of view, enhancing the differences that can be relevant for the regulatory work. The difficulties arising from the application of both the German and US concepts are discussed. (orig.)

  13. On the effectiveness of a license scheme for E-waste recycling: The challenge of China and India

    International Nuclear Information System (INIS)

    Shinkuma, Takayoshi; Managi, Shunsuke

    2010-01-01

    It is well known that China and India have been recycling centers of WEEE, especially printed circuit boards, and that serious environmental pollution in these countries has been generated by improper recycling methods. After the governments of China and India banned improper recycling by the informal sector, improper recycling activities spread to other places. Then, these governments changed their policies to one of promoting proper recycling by introducing a scheme, under which E-waste recycling requires a license issued by the government. In this paper, the effectiveness of that license scheme is examined by means of an economic model. It can be shown that the license scheme can work effectively only if disposers of E-waste have a responsibility to sell E-waste to license holders. Our results run counter to the idea that international E-waste trade should be banned and provide an alternative solution to the problem.

  14. Preparation of environmental reports and impact statements for nuclear power plants

    International Nuclear Information System (INIS)

    Tsai, Y.H.

    1986-01-01

    Considerable first-hand experience has accumulated during the past decade in the United States regarding the preparation of environmental reports (ER) and environmental impact statements (EIS) for nuclear power plants. The US Nuclear Regulatory Commission (USNRC), which is responsible for regulating the construction and operation of nuclear power plants, is required under the National Environmental Policy Act to prepare an EIS for each plant. To obtain information essential to the EIS, the USNRC requires that each power company submit an ER. This paper focuses on the interrelationships of the two environmental documents and discusses the environmental review process and the environmental laws and regulations related to the licensing of nuclear power plants. It also describes the format and content, environmental issues, data requirements, and impact assessment methodologies for preparation of the ER and EIS. Problems associated with preparing the EIS are presented, with particular emphasis on the problems and methodologies associated with evaluating environmental costs and benefits

  15. Conformation of an evaluation process for a license renovation solicitude of a nuclear power plant in Mexico; Conformacion de un proceso de evaluacion para una solicitud de renovacion de licencia de una central nuclear en Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Serrano R, M. L., E-mail: mlserrano@cnsns.gob.mx [Comision Nacional de Seguridad Nuclear y Salvaguardias, Dr. Barragan No. 779, Col. Narvarte, 03020 Mexico D. F. (Mexico)

    2012-10-15

    So that the construction stages, of operation, closing, dismantlement and the radioactive waste disposal of a nuclear power plant (NPP) are carried out in Mexico, is necessary that the operator has a license, permission or authorization for each stage. In Mexico, these licenses, permissions or authorizations are granted by the Energy Secretariat with base in the verdict of the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS). The operation licenses ar the moment effective for the reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) they will expire respectively in the year 2020 and 2025 for the Unit 1 and Unit 2, for what the CNSNS has begun its preparation before a potential solicitude of the licensee to continue the operation of the NPP-L V. Defining the process to continue and to generate the documents that would help in this phase as normalization, guides, procedures, regulations, controls, etc., is the task that intends to be carried out the regulator body so that the evaluation process is effective and efficient, so much for the same regulator body as for the licensee. This work exposes the advance that the CNSNS has in this aspect and is centered specifically in the conformation of an evaluation process of license renovation solicitude, taking as base what the regulator body of the United States of North America (US NRC) established and following to the IAEA. Also, this work includes statistical of electric power production in Mexico, licensing antecedents for the NPP-L V, a world perspective of the license renovations and the regulation of the US NRC related to the license renovation of a NPP. (Author)

  16. Free Software Licenses and Other Free Licenses: Genetic Code of Digital Common Goods

    OpenAIRE

    Marco Ciurcina

    2017-01-01

    This article explores the history and describes the main features of free software licenses and other free licenses in an attempt to shed light on the reasons for their success in promoting individual behaviors converging towards the collective construction of digital commons.

  17. Environmental assessment for sustainable development: process, actors and practice

    International Nuclear Information System (INIS)

    Andre, P.; Delisle, C.E.; Reveret, J.-P.

    2003-01-01

    Multiple environmental problems afflict our contemporary world and have been the subject of discussions during many international meetings. All declarations resulting from these meetings insist on including environmental problems and on environmental assessment (EA) as an important tool to achieve this. This book aims to reach three objectives. First, it introduces EA to people from different disciplines, and therefore it opens up the perspective of new disciplinary horizons. Second, the authors discuss EA as a socio-political process rather than emphasizing methodologies. Third, this book draws mainly on the experience in Francophone countries which is still poorly disseminated. This book focusses on process and actors. Thus, the subject matter is divided into five major parts: the history and major issues of EA from a sustainable development perspective (Chapters 1 to 3); the actors, i.e. the Project Proponent and consulting firms, the public, the decision maker and international actors (Chapters 4 to 7); methods and tools including public participation (Chapters 8 and 9); processes in practice through step by step processes in practice and case studies (Chapters 10 and 11); and, finally, recent and upcoming developments in EA, including elements of strategic environmental assessment (Chapters 12 and 13). An index facilitates searching for information. The reader is also invited to consult the book's website

  18. Managing Licensing in a Market for Technology

    DEFF Research Database (Denmark)

    Arora, Ashish; Fosfuri, Andrea; Rønde, Thomas

    2013-01-01

    , we find that interdependency across business units may result in more, not less, decentralization. Furthermore, even though centralization results in less information, centralized licensing deals are larger. Our model conforms to the existing evidence that reports heterogeneity across firms in both......Technology licensing is an important means for companies to extract more value from their intellectual assets. We build a model that helps understand how licensing activity should be organized within large corporations. More specifically, we compare decentralization—where the business unit using...... the technology makes licensing decisions—to centralized licensing. The business unit has superior information about licensing opportunities but may not have the appropriate incentives because its rewards depend on product market performance. If licensing is decentralized, the business unit forgoes valuable...

  19. Licensing of the first reload of Angra-1 reactor

    International Nuclear Information System (INIS)

    Alvarenga, M.A.B.

    1985-01-01

    The historical aspects related to the licensing of the first reload of Angra-1 reactor are presented. The dates, the institutions, the experts, as well as the documents generated during that process are presented. (M.I.)

  20. A licensing discussion: SMRs in Canada

    International Nuclear Information System (INIS)

    De Vos, M.

    2013-01-01

    The CNSC (Canadian AECB) is ready to regulate Small Modular Reactors (SMR) facilities in Canada. The CNSC is well situated to engage with proponents of SMR reactors in design reviews or licensing discussions. A risk-informed (graded) approach is possible in many instances for reactors but it is not a relaxation of requirements. The vendor design review process helps reduce regulatory risks by encouraging early engagement.

  1. 7 CFR 6.28 - Transfer of license.

    Science.gov (United States)

    2010-01-01

    ... Licensing Authority will transfer to such other person the historical, nonhistorical or designated license... escrow with the sole condition for return of escrow being that the Licensing Authority determines that... to whom the historical licenses were issued during the quota year in which the sale or conveyance...

  2. Free Software Licenses and Other Free Licenses: Genetic Code of Digital Common Goods

    Directory of Open Access Journals (Sweden)

    Marco Ciurcina

    2017-06-01

    Full Text Available This article explores the history and describes the main features of free software licenses and other free licenses in an attempt to shed light on the reasons for their success in promoting individual behaviors converging towards the collective construction of digital commons.

  3. Licensing Teachers: Lessons from Other Professions.

    Science.gov (United States)

    Haberman, Martin

    1986-01-01

    The licensing of teachers should be modeled against professions similar to teaching rather than professions like medicine and architecture that are vastly different. Applying similar licensing practices can raise the status of teaching. Ignoring these licensing practices will prevent teachers from functioning as professionals. (MD)

  4. 10 CFR 51.53 - Postconstruction environmental reports.

    Science.gov (United States)

    2010-01-01

    ... renewal of a license to operate a nuclear power plant under part 54 of this chapter shall submit with its... related to the environmental effects of the proposed action and the alternatives. In addition, the... impact statement; supplements to the final environmental impact statement, including supplements prepared...

  5. Licensing of nuclear and radioactive installations in Peru

    International Nuclear Information System (INIS)

    Medina Gironzini, E.

    1987-01-01

    In Peru, the Regulation for Ionizing Radiation Sources is applied, which establishes the norms and procedures to follow in the nuclear and radioactive installations of the country in order to assure their correct operation as concerns to the nuclear safety and radiological protection, allowing the emission of the respective licenses. As for the nuclear facilities, this authorization includes the Previous License, the Construction License and the Operation License (provisional and definitive) and for radioactive facilities and equipment generating ionizing radiations: the Construction License and the Operation License. The personnel also require a license that can be an operator license (as for nuclear reactors) or a supervisor license (for nuclear and radioactive facilities). In spite of the above mentioned regulation and its long enforcement period, less than 10% of radioactive facilities in this country are licensed, due to different problems which will be solved in the medium term. (Author)

  6. Environmental risk communication as an educational process

    Science.gov (United States)

    Schottenfeld, Faith

    The purpose of this study was to explore the dynamics of the environmental risk communication process. The goal was to look at the totality of the process by examining the different components: entry to communication (what brings people into the process), maintenance of communication (behaviors of participants, pathways to successful risk communication, barriers to successful risk communication, characteristics of the dialogue) and outcomes of risk communication (what has been learned, what moves the process to social action, what else can come of the process). Interviews and critical incidents were used to explore the experiences of risk communicators in four different practice settings: academia, industry/trade groups, community-based organizations and government. Twenty-four people completed critical incident stories and sixteen participated in in-depth interviews. Data were coded and analyzed for themes. Findings illustrated that successful risk communication results from a deliberative, or purposeful process. This process includes a systematic approach to identifying and inviting people to participate, while considering specific motivating factors that affect participation. Risk communication is maintained by creating and nurturing structured forums for dialogue by acknowledging the varying perspectives of the people who participate and the contextual settings of environmental risks. The result of effective dialogue may range from increased knowledge, to transformative learning to social action and policy change. The researcher recommended that a multi-disciplinary team including risk communicators, adult educators and scientists can work most effectively to plan, implement and evaluate a risk communication process.

  7. Environmental vulnerability assessment using Grey Analytic Hierarchy Process based model

    International Nuclear Information System (INIS)

    Sahoo, Satiprasad; Dhar, Anirban; Kar, Amlanjyoti

    2016-01-01

    Environmental management of an area describes a policy for its systematic and sustainable environmental protection. In the present study, regional environmental vulnerability assessment in Hirakud command area of Odisha, India is envisaged based on Grey Analytic Hierarchy Process method (Grey–AHP) using integrated remote sensing (RS) and geographic information system (GIS) techniques. Grey–AHP combines the advantages of classical analytic hierarchy process (AHP) and grey clustering method for accurate estimation of weight coefficients. It is a new method for environmental vulnerability assessment. Environmental vulnerability index (EVI) uses natural, environmental and human impact related factors, e.g., soil, geology, elevation, slope, rainfall, temperature, wind speed, normalized difference vegetation index, drainage density, crop intensity, agricultural DRASTIC value, population density and road density. EVI map has been classified into four environmental vulnerability zones (EVZs) namely: ‘low’, ‘moderate’ ‘high’, and ‘extreme’ encompassing 17.87%, 44.44%, 27.81% and 9.88% of the study area, respectively. EVI map indicates that the northern part of the study area is more vulnerable from an environmental point of view. EVI map shows close correlation with elevation. Effectiveness of the zone classification is evaluated by using grey clustering method. General effectiveness is in between “better” and “common classes”. This analysis demonstrates the potential applicability of the methodology. - Highlights: • Environmental vulnerability zone identification based on Grey Analytic Hierarchy Process (AHP) • The effectiveness evaluation by means of a grey clustering method with support from AHP • Use of grey approach eliminates the excessive dependency on the experience of experts.

  8. Environmental vulnerability assessment using Grey Analytic Hierarchy Process based model

    Energy Technology Data Exchange (ETDEWEB)

    Sahoo, Satiprasad [School of Water Resources, Indian Institute of Technology Kharagpur (India); Dhar, Anirban, E-mail: anirban.dhar@gmail.com [Department of Civil Engineering, Indian Institute of Technology Kharagpur (India); Kar, Amlanjyoti [Central Ground Water Board, Bhujal Bhawan, Faridabad, Haryana (India)

    2016-01-15

    Environmental management of an area describes a policy for its systematic and sustainable environmental protection. In the present study, regional environmental vulnerability assessment in Hirakud command area of Odisha, India is envisaged based on Grey Analytic Hierarchy Process method (Grey–AHP) using integrated remote sensing (RS) and geographic information system (GIS) techniques. Grey–AHP combines the advantages of classical analytic hierarchy process (AHP) and grey clustering method for accurate estimation of weight coefficients. It is a new method for environmental vulnerability assessment. Environmental vulnerability index (EVI) uses natural, environmental and human impact related factors, e.g., soil, geology, elevation, slope, rainfall, temperature, wind speed, normalized difference vegetation index, drainage density, crop intensity, agricultural DRASTIC value, population density and road density. EVI map has been classified into four environmental vulnerability zones (EVZs) namely: ‘low’, ‘moderate’ ‘high’, and ‘extreme’ encompassing 17.87%, 44.44%, 27.81% and 9.88% of the study area, respectively. EVI map indicates that the northern part of the study area is more vulnerable from an environmental point of view. EVI map shows close correlation with elevation. Effectiveness of the zone classification is evaluated by using grey clustering method. General effectiveness is in between “better” and “common classes”. This analysis demonstrates the potential applicability of the methodology. - Highlights: • Environmental vulnerability zone identification based on Grey Analytic Hierarchy Process (AHP) • The effectiveness evaluation by means of a grey clustering method with support from AHP • Use of grey approach eliminates the excessive dependency on the experience of experts.

  9. Whom to Choose as License Partner?

    DEFF Research Database (Denmark)

    Laursen, Keld; Reichstein, Toke; Trombini, Giulia

    2013-01-01

    between technology and market forces: if partners are market distant, the likelihood of technology license contractual partnership decreases with partners’ technological distance. Using data on the formation of license partnerships in the global biopharmaceutical industry over the period 1994......This paper investigates the matching of firms on the market for technology. The paper forwards two dimensions along which license formation occurs: technology and product-market. Both sides of the market search for a partner representing potential for high technology synergies to maximize licensing...

  10. Exporting the Canadian licensing program

    International Nuclear Information System (INIS)

    Whelan, D.J.

    1981-06-01

    This paper deals with the problems of an overseas regulatory agency in licensing a Canadian-supplied nuclear plant which is referenced to a plant in Canada. Firstly, the general problems associated with the use of a reference plant are discussed. This is followed by a discussion of specific problems which arise from the licensing practices in Canada. The paper concludes with recommendations to simplify the task of demonstrating the licensability of an overseas CANDU plant

  11. 7 CFR 6.32 - Globalization of licenses.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Globalization of licenses. 6.32 Section 6.32 Agriculture Office of the Secretary of Agriculture IMPORT QUOTAS AND FEES Dairy Tariff-Rate Import Quota Licensing § 6.32 Globalization of licenses. If the Licensing Authority determines that entries of an article...

  12. Balancing environmental and economic performance in the food-processing industry

    DEFF Research Database (Denmark)

    Akkerman, Renzo; van Donk, Dirk Pieter

    2010-01-01

    Changing customer requirements, unpredictable disturbances combined with expensive production facilities, are major problems for food processing companies to achieve synergy between the economic and environmental performance. There notably is a lack of tools to support decisions to explore effect...... in exploring the effect of uncertainty in demand and production. As a result, process design can be more robust: both economic and environmental. This position paper explores the problem and the main elements of the proposed scenario-based simulation approach.......Changing customer requirements, unpredictable disturbances combined with expensive production facilities, are major problems for food processing companies to achieve synergy between the economic and environmental performance. There notably is a lack of tools to support decisions to explore effects...

  13. 42 CFR 431.710 - Provisional licenses.

    Science.gov (United States)

    2010-10-01

    ... Licensing Nursing Home Administrators § 431.710 Provisional licenses. To fill a position of nursing home... 42 Public Health 4 2010-10-01 2010-10-01 false Provisional licenses. 431.710 Section 431.710 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  14. Licensing of ANSTO'S OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Ordonez, J.P.

    2006-01-01

    Full text: This paper presents a general description of the ongoing licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) Open Pool Australian Light-water (OPAL) Reactor at their Lucas Heights site. It addresses the following aspects: The Construction Licence - what it is and what impact it had on the construction of the OPAL Reactor, specifically the various Construction Licence Conditions; The interface between ANSTO, INVAP and ARPANSA during the construction of the OPAL Reactor, particularly in relation to ARPANS Regulation 54; Specific licensing issues that have arisen during the construction and commissioning process and how they have been resolved; The Operating Licence Application - what it is and how it interfaces with the construction and commissioning of the OPAL Reactor. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators. Note that this paper is an update of a presentation given at IGORR10 and follows on from a paper previously presented at PNBC12 in October 2002

  15. Are screening processes effective instruments and what are the environmental benefits?

    DEFF Research Database (Denmark)

    Nielsen, Eskild Holm; Christensen, Per; Kørnøv, Lone

    2003-01-01

    Environmental Impact Assessment (EIA)is the process by which the effects that proposed projects are likely to have with respect to a number of environmental criteria is evaluated. Screening is an activity carried out in advance of an EIA to determine whether, in fact, it is necessary to undertake...... a full assessment.The paper discuss the extent of changes due to the screening process, and ask questions like what kind of environmental considerations do the changes reflect? And are they in line with EIA's holistic environmental approach?...

  16. To License or Not to License: An Examination of State Statutes Regarding Private Investigators and Digital Examiners

    Directory of Open Access Journals (Sweden)

    Thomas Lonardo

    2008-09-01

    Full Text Available In this paper the authors examine statutes that regulate, license, and enforce investigative functions in each US state. After identification and review of Private Investigator licensing requirements, the authors find that very few state statutes explicitly differentiate between Private Investigators and Digital Examiners. After contacting all state agencies the authors present a distinct grouping organizing state approaches to professional Digital Examiner licensing. The authors conclude that states must differentiate between Private Investigator and Digital Examiner licensing requirements and oversight.

  17. Licensing aspects of the NPP Temelin IandC replacement project

    International Nuclear Information System (INIS)

    Karpeta, C.

    1997-01-01

    The objections raised against the original design of the instrumentation and control system of the Temelin nuclear power plant are summarized. The nuclear regulatory environment of the Czech Republic is described; the activities of the State Office for Nuclear Safety (SONS) are highlighted. The requirements underlying the licensing of the Temelin IandC replacement project are discussed in some detail. The licensing process adopted by SONS is to a certain degree computer-aided. A database has been developed by SONS; the three-layer structure of the database is described. (A.K.)

  18. Regulatory view on licensing and commissioning of Temelin NPP

    International Nuclear Information System (INIS)

    Drabova, D.; Boehm, K.; Brandejs, P.; Tipek, Z.

    2004-01-01

    The competencies delegated to the Czech State Office for Nuclear Safety by Czech legislation are highlighted and the history of construction and commissioning of the Temelin nuclear power plant in relation to the licensing process is described. (P.A.)

  19. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1981-08-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  20. 77 FR 71404 - Notice of Intent to License Government-Owned Inventions; Intent to License on a Partially...

    Science.gov (United States)

    2012-11-30

    ... DEPARTMENT OF DEFENSE Department of the Army Notice of Intent to License Government-Owned Inventions; Intent to License on a Partially-Exclusive Basis AGENCY: Department of the Army, DoD. ACTION... by the Secretary of the Army. The US Army Edgewood Chemical Biological Center intends to license...