WorldWideScience

Sample records for environmental license permit

  1. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  2. 27 CFR 555.45 - Original license or permit.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 3 2010-04-01 2010-04-01 false Original license or permit. 555.45 Section 555.45 Alcohol, Tobacco Products, and Firearms BUREAU OF ALCOHOL, TOBACCO, FIREARMS... Original license or permit. (a) Licenses issued prior to May 24, 2003. Any person who intends to engage in...

  3. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  4. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  5. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  6. Developing pipeline risk methodology for environmental license permit; Metodologia para avaliacao do risco em dutos, no licenciamento ambiental

    Energy Technology Data Exchange (ETDEWEB)

    Arruda, Paulo; Naime, Andre [Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renovaveis (IBAMA), Brasilia, DF (Brazil). Diretoria de Licenciamento e Qualidade Ambiental; Serpa, Ricardo [Companhia de Tecnologia de Saneamento Ambiental (CETESB), Sao Paulo, SP (Brazil). Setor de Analise de Riscos; Mendes, Renato F. [PETROBRAS Engenharia, RJ (Brazil); Ventura, Gilmar [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Some new pipelines undertakings aim to establish connection between gas provinces in the Southeast and consumers in the Northeast of Brazil, in order to supply medium consuming centers and regions with minor potential of development. Consulting companies are carrying out Environmental Assessments studies and among them is the Risk Analyses of these pipeline transmission systems, in order to receive environmental permits by IBAMA, the Federal Brazilian Environmental Agency. In addition, existing interstate pipeline systems which are under IBAMA regulation will also require the same attention. For the purpose of defining a Pipeline Risk Analysis Protocol with methodology and risk criteria, with minimum risk analysis information on a comprehensive process, it has been decided for a 'tour de force' formed by experts from IBAMA and PETROBRAS engineers. The risk assessment protocol is focus on the risk to communities in the neighborhood of these pipelines and on the potential damage to the environment near and far from the ROW. The joined work ended up in two protocols, which attempt to provide environmental license permits for oil pipeline and gas pipelines with minimum contents for risk analysis studies. Another aspect is the environmental risk that has been focused on the contingency plan approach, since there are no consolidated environmental risk criteria for application as a common worldwide sense. The environmental risk mapping - MARA methodology will indicate areas with potential to be affected by leakages along a pipeline system. (author)

  7. Environmental licensing issues for cogeneration plants

    International Nuclear Information System (INIS)

    Lipka, G.S.; Bibbo, R.V.

    1990-01-01

    The siting and licensing of cogeneration and independent power production (IPP) facilities is a complex process involving a number of interrelated engineering, economic, and environmental impact considerations. Important considerations for the siting and licensing of such facilities include air quality control and air quality impacts, water supply and wastewater disposal, and applicable noise criteria and noise impact considerations. Air quality control and air quality impact considerations for power generation facilities are commonly reviewed in the public forum, and most project developers are generally aware of the key air quality licensing issues. These issues include Best Available Control Technology (BACT) demonstration requirements, and air quality modeling requirements. BACT is a case-by-case determination, which causes uncertainty, in that developers have difficulty in projecting the cost of required control systems. Continuing developments in control technology may cause this problem to continue in the 1990's. Air quality modeling can be a problem in hilly terrain or within or near an urban environment, which could delay or preclude permitting of a new cogeneration or IPP facility in such locations. This paper discusses several environmental issues which are less frequently addressed than air quality issues, namely water/wastewater and noise. The design features of typical cogeneration and IPP facilities that affect water supply requirements, wastewater volumes, and noise emissions are discussed. Then, the site selection and impact review process are examined to identify typical constraints and trade-offs that can develop relative to water, wastewater, and noise issues. Trends in permit review requirements for water, wastewater, and noise are examined. Finally, innovative approaches that can be used to resolve potential development constraints for water, wastewater, and noise issues are discussed

  8. Environmental permits in Arab Gulf countries - local government perspective

    International Nuclear Information System (INIS)

    Kuczynski, L.

    2002-01-01

    The legacy of past environmentally careless oil and gas exploration practices is becoming more apparent as time goes by and our understanding of causes and results increase. In many petroleum producing countries and in Arab Gulf countries in particular, this understanding has resulted in greater social demand for environmental protection and responsible exploitation of limited resources. In response to this demand, governments of the Gulf Region are paying increasingly more attention to the responsible management of environmental impacts of new developments. As a result, most of them require developers to obtain environmental permits supported by a variety of environmental baseline studies, Environmental Impact Assessments and comprehensive Environmental Management Plans. These local environmental requirements are similar to those in North America and Europe, although there are some important differences on account of local environmental, historical and socioeconomic conditions. Developers, who choose to ignore them, often find their projects caught in a web of unfamiliar environmental regulations or administrative procedures that may cause costly and unnecessary delays. Based on the author's Canadian and Arab Gulf regulatory experience, this paper describes some common causes that may delay obtaining environmental permits or cause cancellation of a project, and provides ideas to assist companies in securing necessary permits and licenses. (author)

  9. 77 FR 30919 - Commercial Driver's License Testing and Commercial Learner's Permit Standards

    Science.gov (United States)

    2012-05-24

    ..., and 385 [Docket No. FMCSA-2007-27659] Commercial Driver's License Testing and Commercial Learner's... published a final rule titled ``Commercial Driver's License Testing and Commercial Learner's Permit... additional drivers, primarily those transporting certain tanks temporarily attached to the commercial motor...

  10. 78 FR 17875 - Commercial Driver's License Testing and Commercial Learner's Permit Standards

    Science.gov (United States)

    2013-03-25

    ... [Docket No. FMCSA-2007-27659] RIN 2126-AB59 Commercial Driver's License Testing and Commercial Learner's.... The 2011 final rule amended the commercial driver's license (CDL) knowledge and skills testing standards and established new minimum Federal standards for States to issue the commercial learner's permit...

  11. 15 CFR 303.7 - Issuance of licenses and shipment permits.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Issuance of licenses and shipment permits. 303.7 Section 303.7 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE MISCELLANEOUS REGULATIONS WATCHES...

  12. 76 FR 39018 - Commercial Driver's License Testing and Commercial Learner's Permit Standards; Corrections

    Science.gov (United States)

    2011-07-05

    ... [Docket No. FMCSA-2007-27659] RIN 2126-AB02 Commercial Driver's License Testing and Commercial Learner's..., 2011, that will be effective on July 8, 2011. This final rule amends the commercial driver's license... to issue the commercial learner's permit (CLP). Since the final rule was published, FMCSA identified...

  13. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles Forms...

  14. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2001-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document is updated on a quarterly basis

  15. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2000-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, Notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document will be updated on a quarterly basis

  16. Binding and preclusive effect of part-construction permits and preliminary licenses

    International Nuclear Information System (INIS)

    Jarass, H.D.

    1983-01-01

    This contribution discusses the binding and preclusive effect of part-construction permits and preliminary licenses granted in accordance with the laws on air pollution abatement and the Atomic Energy Act. The author states that the granting of a part-construction permit must be based on a final decision over the entire project and must include a preliminary judgement and evaluation of the entire project, also covering site selection and design concept approval. The binding effort and preclusive effect of part-permits are examined in great detail, namely their definition, basic principles, extent, coming into force and term of validity and, (for the preclusive effect), its prerequisites, consequences, considerations regarding immediate execution). The author concludes by stating that there is no difference in regard to binding or preclusive effect between part-construction permits and a preliminary licence. (HP) [de

  17. 10 CFR 51.80 - Draft environmental impact statement-materials license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...

  18. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-Materials Licenses § 51.97 Final environmental impact statement—materials license. (a) Independent spent fuel storage installation (ISFSI...

  19. Environmental assessment proposed license renewal of Nuclear Metals, Inc. Concord, Massachusetts

    International Nuclear Information System (INIS)

    Miller, R.L.; Easterly, C.E.; Lombardi, C.E.; Treitler, I.E.; Winbow, R.T.; Zimmerman, G.P.

    1997-02-01

    The US Nuclear Regulatory Commission (NRC) has prepared this Environmental Assessment (EA) to evaluate environmental issues associated with the renewal of licenses issued by NRC for facilities operated by Nuclear Metals, Inc. (NMI) in Concord, Massachusetts. By renewing the licenses, NRC proposes to allow the continuation of ongoing operations involving radioactive materials at NMI's facilities. This EA focuses on the potential impacts related to air emissions at NMI during normal (incident-free) operations and accidental releases. Findings indicate that there are only two areas of potential concern. First, modeling results for sulfur dioxide (SO 2 ) emissions from the boilers during normal operations indicate that the potential exists for exceeding the short-term National Ambient Air Quality Standards (NAAQS). NMI is prepared to undertake mitigative action to prevent potential exceedances of the short-term SO 2 NAAQS, and the Massachusetts Department of Environmental Protection is prepared to resolve the issue via a permit/approval change or through a Consent Order. Second, in the unlikely event of a severe fire, predicted sulfuric acid (H 2 SO 4 ) concentrations based on conservative (upper bound) modeling exceed the Emergency Response Planning Guideline (ERPG) levels. NMI has committed to NRC to give a briefing for local emergency response officials regarding the potential for an accidental H 2 SO 4 release

  20. Environmental assessment proposed license renewal of Nuclear Metals, Inc. Concord, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Miller, R.L.; Easterly, C.E.; Lombardi, C.E.; Treitler, I.E.; Winbow, R.T.; Zimmerman, G.P. [Oak Ridge National Lab., TN (United States)

    1997-02-01

    The US Nuclear Regulatory Commission (NRC) has prepared this Environmental Assessment (EA) to evaluate environmental issues associated with the renewal of licenses issued by NRC for facilities operated by Nuclear Metals, Inc. (NMI) in Concord, Massachusetts. By renewing the licenses, NRC proposes to allow the continuation of ongoing operations involving radioactive materials at NMI`s facilities. This EA focuses on the potential impacts related to air emissions at NMI during normal (incident-free) operations and accidental releases. Findings indicate that there are only two areas of potential concern. First, modeling results for sulfur dioxide (SO{sub 2}) emissions from the boilers during normal operations indicate that the potential exists for exceeding the short-term National Ambient Air Quality Standards (NAAQS). NMI is prepared to undertake mitigative action to prevent potential exceedances of the short-term SO{sub 2} NAAQS, and the Massachusetts Department of Environmental Protection is prepared to resolve the issue via a permit/approval change or through a Consent Order. Second, in the unlikely event of a severe fire, predicted sulfuric acid (H{sub 2}SO{sub 4}) concentrations based on conservative (upper bound) modeling exceed the Emergency Response Planning Guideline (ERPG) levels. NMI has committed to NRC to give a briefing for local emergency response officials regarding the potential for an accidental H{sub 2}SO{sub 4} release.

  1. Annual Hanford Site environmental permitting status report

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1998-01-01

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, 'best efforts' means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  2. 36 CFR 1011.17 - Will a debtor who owes a debt be ineligible for Presidio Trust licenses, permits, leases...

    Science.gov (United States)

    2010-07-01

    ..., permits, leases, privileges or services? Unless prohibited by law, the Presidio Trust may terminate... be ineligible for Presidio Trust licenses, permits, leases, privileges or services? 1011.17 Section 1011.17 Parks, Forests, and Public Property PRESIDIO TRUST DEBT COLLECTION Procedures To Collect...

  3. Nuclear proliferation and civilian nuclear power: report of the Nonproliferation Alternative Systems Assessment Program. Volume VI. Safety and environmental considerations for licensing

    International Nuclear Information System (INIS)

    1979-12-01

    Volume 6 of the Nonproliferation Alternative Systems Assessment Program report addresses safety and environmental considerations in licensing the principal alternative nuclear reactors and fuel cycles in the United States for large-scale commercial nuclear power plants. In addition, this volume examines the safety and environmental considerations for licensing fuel service centers. These centers, which have been proposed for controlling sensitive fuel-cycle facilities and special nuclear materials, would contain a combination of such facilities as reprocessing plants, fabrication plants, and reactors. For this analysis, two fuel service center concepts were selected - one with power-generating capability and one without. This volume also provides estimates of the time required for development of large-scale commercial reactor systems to reach the construction permit application stage and for fuel-cycle facilities to reach the operating license application stage, which is a measure of the relative technical status of alternative nuclear systems

  4. Waste Feed Delivery Environmental Permits and Approvals Plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    2000-01-01

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches

  5. Generic environmental impact statement for license renewal of nuclear plants

    International Nuclear Information System (INIS)

    1996-05-01

    Volume 2 of the Generic Environmental Impact Statement for License Renewal of Nuclear Plants contains the appendices. These include: (A) General characterisitics and environmental settings of domestic nuclear plants, (B) Definition of impact initiators, (C) Socioeconomics and case studies, (D) Aquatic organisms and human health, (E) Radiation protection considerations, (F) Methodology for assessing impacts to aquatic ecology and water resources, (G) Postulated accidents, and (H) Environmental statutes and regulations affecting license renewal

  6. Waste Feed Delivery Environmental Permits and Approvals Plan

    Energy Technology Data Exchange (ETDEWEB)

    TOLLEFSON, K.S.

    2000-01-18

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  7. U.S. licensing process and ABWR certification

    International Nuclear Information System (INIS)

    Quirk, J.F.; Williams, W.A.

    1996-01-01

    Part 50 of Title 10 of the Code of Federal Regulation (CFR) establishes a two-step licensing process by which the U.S. Nuclear Regulatory Committee (NRC) authorizes nuclear reactor plant construction through issuance of a construction permit and authorizes operation by issuance of an operating license. At each stage, the NRC Staff conducts technical reviews and there is potential for public hearings. In 1989, the NRC issued a new, simplified licensing process: Part 52. The purpose of the Part 52 licensing process is to provide a regulatory framework that brings about earlier resolution of licensing issues. Because issues are not resolved early in the Part 50 licensing process, approval of an operating license is not assured until after a significant investment has been made in the plant. Part 52 increases the stability and certainty of the licensing process by providing for the early resolution of safety and environmental issues. The Part 52 licensing process features (1) early site permits, (2) design certification, and (3) combined construction permit and operating licenses. As part of the U.S. Advanced Light Water Reactor (ALWR) Program to revitalize the nuclear option through the integration of government/utility/industry efforts, GE undertook the role of applying for certification for its latest product line, the Advanced Boiling Water Reactor (ABWR), under the U.S. ABWR certification program. The ABWR design is an essentially complete plant. Initial application for design certification was in 1987 under Part 50. GE reapplied in late 1991 under the newly promulgated Part 52. Following seven years of intensive interactions with the NRC and ACRS, GE was awarded the first Final Design Approval (FDA) under Part 52. The Commission initiated rulemaking by publishing the proposed ABWR Certification Rule in the Federal Register in early 1995. Certification is anticipated mid-1996. (J.P.N.)

  8. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    Energy Technology Data Exchange (ETDEWEB)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow when filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.

  9. Annual Hanford Site Environmental Permitting status report

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    1999-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies

  10. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To...

  11. Improving regulatory effectiveness in Federal/State siting actions: Federal/State regulatory permitting actions in selected nuclear power station licensing cases

    International Nuclear Information System (INIS)

    Baroff, J.

    1977-06-01

    The Federal/State regulatory permitting actions in 12 case histories of nuclear power station licensing in nine different states are documented. General observations regarding Federal/State siting roles in the siting process are included. Eleven of the case histories are illustrated with a logic network that gives the actions of the utilities in addition to the Federal/State permits

  12. Development model to public hearing for environmental licensing of nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Vasques, Luciana Gomes; Aquino, Afonso Rodrigues de, E-mail: lu_vasques@usp.br, E-mail: araquino@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    The use of nuclear technology has always been a matter of concern from an environmental point of view. Although disputed, the generation of electricity in nuclear reactors was considered a source of clean emission in relation to emission of gases responsible for the greenhouse effect. In Brazil, nuclear activities are regulated and supervised by the Brazilian Commission of Nuclear Energy - CNEN. Environmental issues associated with nuclear activities are described by CONAMA, and the developments in this area are licensed by IBAMA, regardless of obtaining nuclear licenses issued by CNEN. Obtaining environmental licenses (prior, installation and operation) depends initially on preparing the Environmental Impact Study - EIS and the Environmental Impact Report - EIR, consisting of a presentation of EIS in language accessible to all. EIR is forwarded to bodies and entities with some connection to the enterprise, to be manifested with IBAMA about the relevance of its content. This information serves as a resource for Public Hearings, which are meetings organized by entrepreneurs, conducted by IBAMA, and rely on public participation, can be considered as a licensing step. Public Hearings are subject to subjectivity, and the model proposed in this research becomes more objective ill-defined, difficult to understand actions for the entrepreneur. (author)

  13. Development model to public hearing for environmental licensing of nuclear facilities

    International Nuclear Information System (INIS)

    Vasques, Luciana Gomes; Aquino, Afonso Rodrigues de

    2015-01-01

    The use of nuclear technology has always been a matter of concern from an environmental point of view. Although disputed, the generation of electricity in nuclear reactors was considered a source of clean emission in relation to emission of gases responsible for the greenhouse effect. In Brazil, nuclear activities are regulated and supervised by the Brazilian Commission of Nuclear Energy - CNEN. Environmental issues associated with nuclear activities are described by CONAMA, and the developments in this area are licensed by IBAMA, regardless of obtaining nuclear licenses issued by CNEN. Obtaining environmental licenses (prior, installation and operation) depends initially on preparing the Environmental Impact Study - EIS and the Environmental Impact Report - EIR, consisting of a presentation of EIS in language accessible to all. EIR is forwarded to bodies and entities with some connection to the enterprise, to be manifested with IBAMA about the relevance of its content. This information serves as a resource for Public Hearings, which are meetings organized by entrepreneurs, conducted by IBAMA, and rely on public participation, can be considered as a licensing step. Public Hearings are subject to subjectivity, and the model proposed in this research becomes more objective ill-defined, difficult to understand actions for the entrepreneur. (author)

  14. Annual Hanford Site Environmental Permitting Status Report

    International Nuclear Information System (INIS)

    HOMAN, N.A.

    2000-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year

  15. Scallop License Limitation Program (SLLP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — A federal Scallop License Limitation Program (SLLP) license is required onboard any vessel deployed in scallop fisheries in Federal waters off Alaska (except for...

  16. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  17. 10 CFR 50.23 - Construction permits.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  18. 10 CFR 205.329 - Environmental requirements for Presidential Permits-Alternative 2.

    Science.gov (United States)

    2010-01-01

    ... Facilities for Transmission of Electric Energy at International Boundaries § 205.329 Environmental... 10 Energy 3 2010-01-01 2010-01-01 false Environmental requirements for Presidential Permits... such Presidential Permits: (1) ERA will determine whether an Environmental Impact Statement (EIS) or an...

  19. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Science.gov (United States)

    2010-01-01

    ...-water-cooled nuclear power reactors, the environmental report must contain the basis for evaluating the contribution of the environmental effects of fuel cycle activities for the nuclear power reactor. (4) Each... paragraph. For other than light-water-cooled nuclear power reactors, the environmental report shall contain...

  20. Nuclear power plant licensing: opportunities for improvement

    International Nuclear Information System (INIS)

    1977-06-01

    On April 20, 1977, the Commission directed that recently completed licensing actions be reviewed by the staff for the purpose of identifying ways to improve the effectiveness and efficiency of NRC nuclear power plant licensing activities. This report summarizes the results of a study undertaken by an internal ad hoc Study Group established in response to that directive. The Study Group limited its considerations to safety and environmental review activities. The background, scope, assumptions and objectives of the study are discussed. A prime assumption of this study was that improvements in the efficiency should not be permitted to reduce the current quality achieved in the licensing process. This consideration underlies the conclusions and recommendations of the study

  1. Generic environmental impact statement for license renewal of nuclear plants. Final report

    International Nuclear Information System (INIS)

    1996-05-01

    This GEIS examines the possible environmental impacts that could occur as a result of renewing the licenses of individual nuclear power plants under 10 CFR 54. To the extent possible, it establishes the bounds and significance of these potential impacts. The analysis encompasses all operating light-water reactors. For each type of environmental impact, the GEIS attempts to establish generic findings covering as many plants as possible. While plant and site-specific information is used in developing the generic findings, the NRC does not intend for the GEIS to be a compilation of individual plant environmental impacts statements. This document has three principal objectives: (1) to provide an understanding of the types and severity of environmental impacts that may occur as a result of license renewal, (2) to identify and assess those impacts that are expected to be generic to license renewal, and (3) to support rulemaking (10 CFR 51) to define the number and scope of issues that need to be addressed by the applicants in plant-by-plant license renewal proceedings

  2. The Brazilian Audit Tribunal's role in improving the federal environmental licensing process

    International Nuclear Information System (INIS)

    Lima, Luiz Henrique; Magrini, Alessandra

    2010-01-01

    This article describes the role played by the Brazilian Audit Tribunal (Tribunal de Contas da Uniao - TCU) in the external auditing of environmental management in Brazil, highlighting the findings of an operational audit conducted in 2007 of the federal environmental licensing process. Initially, it records the constitutional and legal framework of Brazilian environmental licensing, describing the powers and duties granted to federal, state and municipal institutions. In addition, it presents the responsibilities of the TCU in the environmental area, comparing these with those of other Supreme Audit Institutions (SAI) that are members of the International Organization of Supreme Audit Institutions (INTOSAI). It also describes the work carried out in the operational audit of the Brazilian environmental licensing process and its main conclusions and recommendations. Finally, it draws a parallel between the findings and recommendations made in Brazil with those of academic studies and audits conducted in other countries.

  3. The importance of environmental education in the process of nuclear and environmental licensing of nuclear facilities

    International Nuclear Information System (INIS)

    Araujo, Jefferson Borges; Ribeiro, Katia Maria Bruno

    2009-01-01

    Today, there is a thread with regard to the global environment. To reduce the environmental impact due to spending supplies to meet the basic needs of the global population. Can be considered as the power of these needs and in this context, the environmental impact occurs by the use of fossil fuels and loss of land for use of water resources. To minimize these impacts, governments are establishing appropriate laws towards the use of renewable energy. However it appears that there is still a great distance between the established law and implementation in practice. In this context nuclear energy is an attractive option, both economic and environmental. The facilities that are somehow associated with nuclear power plants are classified as radioactive or nuclear. These facilities are subject to two licensing procedures: Environmental (by IBAMA) and Nuclear (by CNEN). Nuclear installations such as nuclear power plants Angra 1 and 2, deposits and tailings facilities of the nuclear fuel cycle in Rezende that are more the attention of the population. As part of these processes are reports of analysis of safety and environmental impacts and socio-economic (EIA/RIMA RFAS), which are available to the public and then discussed at public hearings, where there is the opportunity for questions on these reports. These questions are mainly related with the social-environmental and economic due to construction and operation of these facilities. This work is a research, discussing the law, identifying the difficulties in the licensing process and presents a discussion on the importance of environmental education at all school levels, for adult audiences and is a connection between the environmental education and process of environmental licensing and nuclear, showing how the popular consciousness more informed can better discuss issues associated with these licenses, understand the advantages and disadvantages and obtain benefits. (author)

  4. A Framework for Building Efficient Environmental Permitting Processes

    Directory of Open Access Journals (Sweden)

    Nicola Ulibarri

    2017-01-01

    Full Text Available Despite its importance as a tool for protecting air and water quality, and for mitigating impacts to protected species and ecosystems, the environmental permitting process is widely recognized to be inefficient and marked by delays. This article draws on a literature review and interviews with permitting practitioners to identify factors that contribute to delayed permit decisions. The sociopolitical context, projects that are complex or use novel technology, a fragmented and bureaucratic regulatory regime, serial permit applications and reviews, and applicant and permitting agency knowledge and resources each contribute to permitting inefficiency when they foster uncertainty, increase transaction costs, and allow divergent interests to multiply, yet remain unresolved. We then use the interviews to consider the potential of a collaborative dialogue between permitting agencies and applicants to mitigate these challenges, and argue that collaboration is well positioned to lessen permitting inefficiency.

  5. 41 CFR 105-55.013 - Suspension or revocation of eligibility for loans and loan guaranties, licenses, permits, or...

    Science.gov (United States)

    2010-07-01

    ... extend credit after the delinquency has been resolved. The Secretary may exempt classes of debts from this prohibition and has prescribed standards defining when a “delinquency” is “resolved” for purposes... revoke licenses, permits, or privileges, the Agency will ascertain the impact of the Bankruptcy Code...

  6. Environmental Standard Review Plan for the review of license renewal applications for nuclear power plants

    International Nuclear Information System (INIS)

    O'Brien, J.; Kim, T.J.; Reynolds, S.

    1991-08-01

    The Environmental Standard Review Plan for the Review of License Applications for Nuclear Power Plants (ESRP-LR) is to be used by the NRC staff when performing environmental reviews of applications for the renewal of power reactor licenses. The use of the ESRP-LR provides a framework for the staff to determine whether or not environmental issues important to license renewal have been identified and the impacts evaluated and provides acceptance standards to help the reviewers comply with the National Environmental Policy Act

  7. Waste feed delivery environmental permits and approvals plan

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, that may affect waste feed delivery (WFD) activities in the Hanford Site's Tank Waste Remediation System (TWRS). This plan expands on the summary level information in the Tank Waste Remediation System Environmental Program Plan (HNF 1773) to address requirements that are most pertinent to WFD. This plan outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for WFD to proceed. Appendices at the end of this plan provide preliminary cost and schedule estimates for implementing the selected strategies. The rest of this section summarizes the scope of WFD activities, including important TWRS operating information, and describes in more detail the objectives, structure, and content of this plan

  8. Groundfish/Crab License Limitation Program (LLP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — As of January 1, 2000 a Federal License Limitation Program (LLP) license is required for vessels participating in directed fishing for LLP groundfish species in the...

  9. 78 FR 37324 - Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications

    Science.gov (United States)

    2013-06-20

    ... Environmental Reports for Nuclear Power Plant License Renewal Applications AGENCY: Nuclear Regulatory Commission... for Nuclear Power Plant License Renewal Applications.'' This regulatory guide provides guidance to... renewal of a nuclear power plant operating license. Applicants should use this regulatory guide when...

  10. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Science.gov (United States)

    2010-01-01

    ... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...

  11. 78 FR 37281 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses

    Science.gov (United States)

    2013-06-20

    ... factors: (1) License renewal will involve nuclear power plants for which the environmental impacts of...) Changes in the environment around nuclear power plants are gradual and predictable. The 1996 GEIS improved... environmental impacts that may occur from renewing commercial nuclear power plant operating licenses; (2...

  12. Environmental impact studies of projects be licensed under the Atomic Law

    International Nuclear Information System (INIS)

    Heuel-Fabianek, Burkhard; Lennartz, Reinhard

    2009-01-01

    The German Law on Environmental Impact Assessment (UVPG) defines projects to be licensed under the Atomic Law that require an environmental impact study (EIS). Since the project concepts as defined in the UVPG are often not the same as those defined in the Atomic Law (AtG), the licensing authority has to decide which project should be subjected to an EIA. Additionally, Article 37 of the EURATOM Treaty obliges every Member State to communicate certain data relating to the impact of emissions of radioactive substances to the Commission. This is independent of the EIA. A licence may only be granted by the competent authorities if an opinion has been received from the Commission pursuant to Article 37. In either case, the licensing authority is the first point of contact for the applicant if the question arises of whether a project has to be subjected to an EIA. A ''voluntary'' EIA should be regarded with caution because of the complexity of such a procedure within the licensing process requiring considerable resources of time and manpower, and the danger of a loss of credibility of the EIA. (orig.)

  13. Environmental assessment for final rule on nuclear power plant license renewal

    International Nuclear Information System (INIS)

    1991-12-01

    The Atomic Energy Act and Nuclear Regulatory Commission (NRC) regulations provide for the renewal of nuclear power plant operating licenses beyond their initial 40-year term. The Act and NRC regulations, however, do not specify the procedures, criteria, and standards that must be satisfied in order to renew a license. The NRC is promulgating a rule (10 CFR Part 54) to codify such requirements prior to the receipt of applications for license renewal. The NRC has assessed the possible environmental effects of promulgating requirements in 10 CFR Part 54 now rather than employing such requirements in an ad hoc manner in individual licensing actions. The final part 54 rule requires the development of information and analyses to identify aging problems of systems, structures, and components unique to license renewal that will be of concern during the period of extended operation and will not be controlled by existing effective programs. In general, licensee activities for license renewal may involve replacement, refurbishment, inspection, testing, or monitoring. Such actions will be generally be within the range of similar actions taken for plants during the initial operating term. These actions would be primarily confined within the plants with potential for only minor disruption to the environment. It is unlikely that these actions would change the operating conditions of plants in ways that would change the environmental effects already being experienced. Relicensing under existing regulations would also be primarily focused on aging degradation and would likely result in requirements similar to those that will result from relicensing under the final rule

  14. [Environmental licensing of major undertakings: possible connection between health and environment].

    Science.gov (United States)

    Silveira, Missifany; Araújo Neto, Mário Diniz de

    2014-09-01

    The prospect of multidisciplinary assessment that considers the environmental impacts on the health of the population during the implementation of potentially polluting projects is incipient in Brazil. Considering the scenario of major undertakings in the country, broadening the outlook on the health and environment relationship based on social and economic development processes striving for environmentally sustainable projects is a key strategy. This article examines the debate on the relationship between the current development model, the risks, the environment and health and discusses the importance of the participation of the health sector in the environmental licensing procedures, which is the instrument of the Environmental Impact Assessment (EIA). Seeking to create more environmentally and socially sustainable territories, the health sector has been looking for opportunities to participate in the licensing processes of major undertakings from the EIA standpoint. Results of research conducted by the Ministry of Health have demonstrated the form of participation in these processes, highlighting the strengths and weaknesses that favor or hinder the increase of preventive actions in public health in the implementation of major undertakings in Brazil.

  15. Tradeable emission permits in Dutch environmental policy. A utopia?

    International Nuclear Information System (INIS)

    Schuurman, S.J.

    1997-01-01

    Because of the lack of experience with permits in the Netherlands, and in view of the similarities between various other tradeable permit systems, the functioning of Dutch systems of tradeable fish, milk and manure quotas is discussed. Evaluation of these systems is based on criteria of effectiveness, target-group efficiency and government efficiency. These systems of tradeable permits appear to constitute a successful addition to the Dutch policy of direct regulation. Considering this, and the favorable American experience with the Emissions Trading Program, tradeable emission permits deserve a chance to be implemented in Dutch environmental policy. The question remains, however, whether the Dutch government is ready for such a step. 28 refs

  16. Cogeneration : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Deshaye, Joyce; Bloomquist, R. Gordon

    1992-12-01

    This guidebook focuses on cogeneration development. It is one of a series of four guidebooks recently prepared to introduce the energy developer to the federal, state and local agencies that regulate energy facilities in Idaho, Montana, Oregon, and Washington (the Bonneville Power Administration Service Territory). It was prepared specifically to help cogeneration developers obtain the permits, licenses and approvals necessary to construct and operate a cogeneration facility. The regulations, agencies and policies described herein are subject to change. Changes are likely to occur whenever energy or a project becomes a political issue, a state legislature meets, a preexisting popular or valuable land use is thought threatened, elected and appointed officials change, and new directions are imposed on states and local governments by the federal government. Accordingly, cogeneration developers should verify and continuously monitor the status of laws and rules that might affect their plans. Developers are cautioned that the regulations described herein may only be a starting point on the road to obtaining all the necessary permits.

  17. Environmental policy on the fixed-fee licensing of eco-technology under foreign penetration

    OpenAIRE

    Kim, Seung-Leul; Lee, Sang-Ho

    2016-01-01

    This study investigates environmental policy on the fixed-fee licensing strategy of clean eco-technology by an innovator having foreign ownership. We show that near-zero emission taxes accompanied by non-exclusive licensing regulation can improve social welfare when the cost gap is small or foreign penetration is high. However, when foreign ownership is not high, exclusive licensing regulations with an appropriate emission tax policy may improve social welfare.

  18. 10 CFR 205.328 - Environmental requirements for Presidential Permits-Alternative 1.

    Science.gov (United States)

    2010-01-01

    ... Facilities for Transmission of Electric Energy at International Boundaries § 205.328 Environmental... 10 Energy 3 2010-01-01 2010-01-01 false Environmental requirements for Presidential Permits... responsible for the costs of preparing any necessary environmental document, including an Environmental Impact...

  19. 78 FR 46255 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction

    Science.gov (United States)

    2013-07-31

    ... Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction AGENCY: Nuclear... nuclear power plant. Compliance with the provisions of the rule is required by June 20, 2014. This... environmental effect of renewing the operating license of a nuclear power plant. This document is necessary to...

  20. Shirley Basin Uranium Mill. Environmental report to accompany source material license application

    International Nuclear Information System (INIS)

    1975-12-01

    This document summarizes all of the environmental monitoring conducted by Utah. This Environmental Report consequently supplements and updates the information presented in the Source Material License application of August 18, 1970 and the Final Environmental Statement (FES) of December 1974. Water and air quality, liquid waste management, soil/vegetation monitoring, and reclamation are covered

  1. Experience acquired by Furnas for licensing nuclear power plants

    International Nuclear Information System (INIS)

    Silva, A.J.C. da; Xavier, E.E.

    1986-01-01

    The system for licensing of Almirante Alvaro Alberto Nuclear Power Plant-Unit 1 is presented. The process phases for reactor construction and operation are described: preliminary site approval; bases for safety review; partial construction permits; final construction permits; emission of final report of safety analysis; initial operation license and permanent operation license. (M.C.K.) [pt

  2. Licensing reform in the USA

    International Nuclear Information System (INIS)

    1991-01-01

    The licensing process for nuclear power plants in the USA is currently in two distinct stages: the issuance of a construction permit followed later by the issuance of an operation license. The ''two-step'' process has come under heavy criticism from the U.S. nuclear industry on the grounds that it causes uncertainty and delays and therefore inhibits new commitments to nuclear power plants. In 1989 the NRC published new regulations for the licensing of nuclear power plants which provide for the issuance of early site permits, safety certifications of standard designs, and combined construction permits and operating licences. The new rule was challenged by intervenors representing antinuclear groups who filed a legal challenge seeking to have the rule set aside on the grounds that it violates the Atomic Energy Act which they allege makes two-step licensing mandatory. In November 1990 the US Court of Appeals upheld the NRC's authority to issue combined licenses. An appeal for a rehearing has been filed. The paper analyses the events and the possible consequences of an adverse court decision. It reviews the options open to the NRC and industry if the court decision is upheld. The possibility of congressional action to amend the Atomic Energy Act is discussed. (author)

  3. Application of probabilistic risk assessment in nuclear and environmental licensing processes of nuclear reactors in Brazil

    International Nuclear Information System (INIS)

    Mata, Jonatas F.C. da; Vasconcelos, Vanderley de; Mesquita, Amir Z.

    2015-01-01

    The nuclear accident at Fukushima Daiichi, occurred in Japan in 2011, brought reflections, worldwide, on the management of nuclear and environmental licensing processes of existing nuclear reactors. One of the key lessons learned in this matter, is that the studies of Probabilistic Safety Assessment and Severe Accidents are becoming essential, even in the early stage of a nuclear development project. In Brazil, Brazilian Nuclear Energy Commission, CNEN, conducts the nuclear licensing. The organism responsible for the environmental licensing is Brazilian Institute of Environment and Renewable Natural Resources, IBAMA. In the scope of the licensing processes of these two institutions, the safety analysis is essentially deterministic, complemented by probabilistic studies. The Probabilistic Safety Assessment (PSA) is the study performed to evaluate the behavior of the nuclear reactor in a sequence of events that may lead to the melting of its core. It includes both probability and consequence estimation of these events, which are called Severe Accidents, allowing to obtain the risk assessment of the plant. Thus, the possible shortcomings in the design of systems are identified, providing basis for safety assessment and improving safety. During the environmental licensing, a Quantitative Risk Analysis (QRA), including probabilistic evaluations, is required in order to support the development of the Risk Analysis Study, the Risk Management Program and the Emergency Plan. This article aims to provide an overview of probabilistic risk assessment methodologies and their applications in nuclear and environmental licensing processes of nuclear reactors in Brazil. (author)

  4. Application of probabilistic risk assessment in nuclear and environmental licensing processes of nuclear reactors in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Mata, Jonatas F.C. da; Vasconcelos, Vanderley de; Mesquita, Amir Z., E-mail: jonatasfmata@yahoo.com.br, E-mail: vasconv@cdtn.br, E-mail: amir@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2015-07-01

    The nuclear accident at Fukushima Daiichi, occurred in Japan in 2011, brought reflections, worldwide, on the management of nuclear and environmental licensing processes of existing nuclear reactors. One of the key lessons learned in this matter, is that the studies of Probabilistic Safety Assessment and Severe Accidents are becoming essential, even in the early stage of a nuclear development project. In Brazil, Brazilian Nuclear Energy Commission, CNEN, conducts the nuclear licensing. The organism responsible for the environmental licensing is Brazilian Institute of Environment and Renewable Natural Resources, IBAMA. In the scope of the licensing processes of these two institutions, the safety analysis is essentially deterministic, complemented by probabilistic studies. The Probabilistic Safety Assessment (PSA) is the study performed to evaluate the behavior of the nuclear reactor in a sequence of events that may lead to the melting of its core. It includes both probability and consequence estimation of these events, which are called Severe Accidents, allowing to obtain the risk assessment of the plant. Thus, the possible shortcomings in the design of systems are identified, providing basis for safety assessment and improving safety. During the environmental licensing, a Quantitative Risk Analysis (QRA), including probabilistic evaluations, is required in order to support the development of the Risk Analysis Study, the Risk Management Program and the Emergency Plan. This article aims to provide an overview of probabilistic risk assessment methodologies and their applications in nuclear and environmental licensing processes of nuclear reactors in Brazil. (author)

  5. Licensing process for future applications of advanced-design nuclear reactors

    International Nuclear Information System (INIS)

    Miller, C.L.

    1990-01-01

    The existing 10CFR50 two-step licensing process in the Code of Federal Regulations can continue to be a viable licensing vehicle for future applications, at least for the near future. The US Nuclear Regulatory Commission (NRC) Commissioners and staff, the public, and the utilities (along with supporting architect/engineers and nuclear steam supply system vendors) have a vast body of experience and knowledge of the existing part 50 licensing process. All these participants are familiar with their respective roles in this process, and history shows this process to be a workable licensing vehicle. Nevertheless, the use of 10CFR52 should be encouraged for future applications. This proposed new rule is intended to achieve the early resolution of licensing issues, to reduce the complexity and uncertainty of the licensing process, and enhance the safety and reliability of nuclear power plants. Part 52's overall purpose is to improve reactor safety and streamline the licensing process by encouraging the use of standard reactor designs and by allowing the early resolution of site environmental and reactor safety issues. The public should be afforded an earlier entry into the licensing process as a result of design certification rulemaking process and combined construction permit/operating license hearings

  6. Environmental Licensing: an Instrument of Command and Control by Exception?

    OpenAIRE

    Sleman Chams, Juliette; Gestión Ambiental de la Corporación Autónoma Regional del Atlántico-CRA, autoridad ambiental del Departamento del Atlántico,; Velásquez Muñoz, Carlos Javier; Universidad del Norte (Barranquilla)

    2016-01-01

    This article analyzes the situation of the most important instrument of command and control existing in the Colombian environmental legislation: the environmental license. Since its first formal regulation, on behalf of Decree 1753 of August 3, 1994, has received several modifications which, apparently, have made, in spite of its importance, in an instrument of command and control by exception. The article revises on the scope of each of the modifications and the justifications put forward by...

  7. 10 CFR 51.62 - Environmental report-land disposal of radioactive waste licensed under 10 CFR part 61.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-land disposal of radioactive waste....62 Environmental report—land disposal of radioactive waste licensed under 10 CFR part 61. (a) Each applicant for issuance of a license for land disposal of radioactive waste pursuant to part 61 of this...

  8. Improving the effectiveness of impact assessment pertaining to Indigenous peoples in the Brazilian environmental licensing procedure

    International Nuclear Information System (INIS)

    Hanna, Philippe; Vanclay, Frank; Langdon, Esther Jean; Arts, Jos

    2014-01-01

    The number of environmental licence applications for projects affecting Indigenous peoples in Brazil has increased since the implementation of a major infrastructure program (Programa de Aceleração do Crescimento) in 2007. This increase has caused problems for Brazilian agencies involved in environmental licensing procedures (IBAMA, FUNAI and others). We analyze the Brazilian environmental licensing procedure for situations involving Indigenous peoples, Maroons (Quilombolas) or other traditional communities in order to identify potential improvements for Brazil and potentially other countries. Although Brazilian procedures are consistent with international best practice in environmental licensing, in practice social impacts are inadequately addressed, mitigation measures are poorly implemented, and there is a lack of enforcement and compliance. The paper is based on document analysis and interviews with key actors in governmental and non-governmental organizations and Indigenous leaders. We suggest that Free, Prior and Informed Consent (FPIC) processes need to be conducted at the earliest stages of project planning, and that Indigenous peoples should actively participate in impact assessment, monitoring and evaluation processes. In order to achieve a social licence to operate, there needs to be full recognition of traditional knowledge and acceptance of Indigenous values and concepts. We also recommend increased involvement of social experts and mediators as well as improved accountability, enforcement and grievance mechanisms in the licensing process. - Highlights: • The Brazilian environmental licensing system needs to address social impacts better. • Communities need to be consulted at the earliest stage possible. • Indigenous peoples need to be invited to participate in impact assessment teams. • Independent Indigenous committees to monitor implementation of mitigation measures. • Accountability, enforcement and grievance mechanisms need to be

  9. Improving the effectiveness of impact assessment pertaining to Indigenous peoples in the Brazilian environmental licensing procedure

    Energy Technology Data Exchange (ETDEWEB)

    Hanna, Philippe [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, PO Box 800, 9700 AV Groningen (Netherlands); Vanclay, Frank, E-mail: frank.vanclay@rug.nl [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, PO Box 800, 9700 AV Groningen (Netherlands); Langdon, Esther Jean [Department of Anthropology, Center for Philosophy and Human Sciences, Federal University of Santa Catarina PO Box 5104, 88040-970, Florianópolis, SC (Brazil); Arts, Jos [Department of Planning, Faculty of Spatial Sciences, University of Groningen, PO Box 800, 9700 AV Groningen (Netherlands)

    2014-04-01

    The number of environmental licence applications for projects affecting Indigenous peoples in Brazil has increased since the implementation of a major infrastructure program (Programa de Aceleração do Crescimento) in 2007. This increase has caused problems for Brazilian agencies involved in environmental licensing procedures (IBAMA, FUNAI and others). We analyze the Brazilian environmental licensing procedure for situations involving Indigenous peoples, Maroons (Quilombolas) or other traditional communities in order to identify potential improvements for Brazil and potentially other countries. Although Brazilian procedures are consistent with international best practice in environmental licensing, in practice social impacts are inadequately addressed, mitigation measures are poorly implemented, and there is a lack of enforcement and compliance. The paper is based on document analysis and interviews with key actors in governmental and non-governmental organizations and Indigenous leaders. We suggest that Free, Prior and Informed Consent (FPIC) processes need to be conducted at the earliest stages of project planning, and that Indigenous peoples should actively participate in impact assessment, monitoring and evaluation processes. In order to achieve a social licence to operate, there needs to be full recognition of traditional knowledge and acceptance of Indigenous values and concepts. We also recommend increased involvement of social experts and mediators as well as improved accountability, enforcement and grievance mechanisms in the licensing process. - Highlights: • The Brazilian environmental licensing system needs to address social impacts better. • Communities need to be consulted at the earliest stage possible. • Indigenous peoples need to be invited to participate in impact assessment teams. • Independent Indigenous committees to monitor implementation of mitigation measures. • Accountability, enforcement and grievance mechanisms need to be

  10. The environmental licensing processes of the offshore oil and natural gas exploration and production in the world and in Brazil: a comparative analysis considering the utilization of studies of the strategic environmental assessment; O processo de licenciamento ambiental das atividades de exploracao e producao de petroleo e gas natural offshore no mundo e no Brasil: uma analise comparativa considerando a utilizacao de estudos de avaliacao ambiental estrategica

    Energy Technology Data Exchange (ETDEWEB)

    Mariano, Jacqueline [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE). Programa de Planejamento Energetico

    2004-07-01

    This study presents an analyses of the environmental licensing processes of the offshore oil and gas exploration and production of the following countries: USA, UK, Norway, Australia and Canada, and makes a comparison with the Brazilian case. This study also emphasizes the use of the Strategical Environmental Assessments (SEA) before the bid procedures. The SEA studies aim to predict and to evaluate the environmental implications of the adoption of sectorial policies and programs and are very useful to the decision making processes. They permit the exclusion of environmental sensitive areas and contribute to the improvement of the environmental management of the regions where the activities will take place. The selected countries use SEA as an environmental management tool and their experience is analysed so as to provide suggestions for the improvement of the current Brazilian environmental licensing process. (author)

  11. Renewal of operating licenses: the U.S. model

    International Nuclear Information System (INIS)

    Petroll, M.; Tveiten, B.

    2006-01-01

    Nearly half of the American nuclear power plants by now have been granted permits allowing them to be operated for twenty years more than originally planned. Procedures to this effect are under way for one quarter of U.S. nuclear power plants. For the operators, plant life extension, as a rule, is economically preferable to building new baseload plants or buying electricity from other sources. In the licensing procedures, the U.S. regulatory authority examines both environmental aspects and safety aspects of extended operation. The technical basis of assessment is the GALL report (Generic Aging Lessons Learnt) which by now has become the consolidated yardstick used by the authorities for safety assessment. In these procedures, the licensee is required to present updated design documents and, if applicable, extend or create from scratch programs of aging management. The case of the oldest nuclear power plant in operation in the United States is described to show the steps of an American licensing and administrative court procedure. Granting renewed operating permits began before President Bush's term and will continue independent of the change in government in 2008. (orig.)

  12. Environmental Standard Review Plan for the review of a license application for a low-level radioactive waste disposal facility: Environmental report

    International Nuclear Information System (INIS)

    1987-04-01

    The Environmental Standard Review Plan (ESRP) (NUREG-1300) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform environmental reviews of environmental reports prepared by applicants in support of license applications to construct and operate new low-level radioactive waste disposal facilities. The individual ESRPs that constitute this document identify the information considered necessary to conduct the review, the purpose and scope of the review, the analysis procedure and evaluation, the formal input to the environmental statement, and the references considered appropriate for each review. The ESRP is intended to ensure quality and uniformity of approach in individual reviews as well as compliance with the National Environmental Policy Act of 1969. In addition, the ESRP will make information about the environmental component of the licensing process more readily available and thereby will serve to improve the understanding of this process among the public, States and regional compacts, and the regulated community

  13. Managing the high level waste nuclear regulatory commission licensing process

    International Nuclear Information System (INIS)

    Baskin, K.P.

    1992-01-01

    This paper reports that the process for obtaining Nuclear Regulatory Commission permits for the high level waste storage facility is basically the same process commercial nuclear power plants followed to obtain construction permits and operating licenses for their facilities. Therefore, the experience from licensing commercial reactors can be applied to the high level waste facility. Proper management of the licensing process will be the key to the successful project. The management of the licensing process was categorized into four areas as follows: responsibility, organization, communication and documentation. Drawing on experience from nuclear power plant licensing and basic management principles, the management requirement for successfully accomplishing the project goals are discussed

  14. 78 FR 37325 - License Renewal of Nuclear Power Plants; Generic Environmental Impact Statement and Standard...

    Science.gov (United States)

    2013-06-20

    ... Nuclear Power Plants; Generic Environmental Impact Statement and Standard Review Plans for Environmental... for Nuclear Power Plants, Supplement 1: Operating License Renewal'' (ESRP). The ESRP serves as a guide... published a final rule, ``Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating...

  15. Establishing a safety and licensing basis for generation IV advanced reactors. License by test

    International Nuclear Information System (INIS)

    Kadak, Andrew C.

    2001-01-01

    The license by test approach to licensing is a novel method of licensing reactors. It provides an opportunity to deal with innovative non-water reactors in a direct way on a time scale that could permit early certification based on tests of a demonstration reactor. The uncertainties in the design and significant contributors to risk would be identified in the PRA during the design. Deterministic analysis computer codes could be tested on a real reactor. Scaling effects and associated uncertainties would be minimized. License by test is an approach that has sufficient merit to be developed and tested

  16. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1998-01-01

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464

  17. Project W-521, waste feed delivery systems environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document has been prepared to define the specific environmental requirements applicable to Project W-521. The document describes the permits and approvals necessary for the project to design, construct, and install planned upgrades, and provides a schedule of activities and provides cost estimates to complete the required permitting and approval activities

  18. Risk and environmental impact assessment: nuclear and environmental licensing interface

    International Nuclear Information System (INIS)

    Costa, Eduardo M.; Monteiro, Iara A.

    1997-01-01

    The main aims of this paper are the identification and discussion of interfaces and application of common concepts in the existing nuclear and environmental licensing procedures. Risk and impact assessment of nuclear electricity generation are two of these concepts which are discussed detail. The risk concept, which had initially focused on engineering projects, has been extended to many other areas of human activity. Risk resulting from the use of ionization radiation has been associated to the dose for the critical members of the public. Therefore, radiation protection applies basic dose limits which are established in national and international recommendations. These recommendations are increasing the emphasis to keep all the exposures to ionizing radiation as low as reasonable achievable, economical and social factors being taken into account. On the other hand, environmental impact assessment has been used as a tool in planning and decision-making processes, thus including environmental concern in the discussion of social and economical development strategies. This paper aims to discuss the association of these two concepts by presenting the procedures of control of radiological impact during normal operation of a nuclear power plant and the various forms of risk communication to the public in the case of events occurrence. (author). 13 refs

  19. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  20. Geothermal : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Bloomquist, R.Gordon

    1991-10-01

    The actual geothermal exploration and development may appear to be a simple and straightforward process in comparison to the legal and institutional maze which the developer must navigate in order to obtain all of the federal, state, and local leases, permits, licenses, and approvals necessary at each step in the process. Finally, and often most difficult, is obtaining a contract for the sale of thermal energy, brine, steam, or electricity. This guide is designed to help developers interested in developing geothermal resource sites in the Bonneville Power Administration Service Territory in the state of Idaho, Montana, Oregon, and Washington better understand the federal, state, and local institutional process, the roles and responsibilities of each agency, and how and when to make contact in order to obtain the necessary documents.

  1. Permitted Marine Hydrokinetic Projects

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data represents pending or issued preliminary permits or issued licenses for marine hydrokinetic projects that produce energy from waves or directly from the...

  2. Generic data sources for the update of an environmental report in support of license renewal

    International Nuclear Information System (INIS)

    Mauro, John J.

    1991-01-01

    Over the past 2 years, our organization has been providing assistance to the NUMARC PLEX working group in matters pertaining to the environmental impacts of license renewal. Part of this support was the identification of data sets and publications that may be useful to the NRC in the preparation of their Environment Report Supplements (ERSs). The following presents a strategy for preparing an ERS, along with references and data sets pertinent to each ER topic. Each section of the ERS should present the following information: (1) Updated information on plant design and operating experience, along with projections of the plant impacts through the end of its currently licensed period of operation. These impacts are used as a baseline against which to compare the projected impacts for the period of license renewal. In addition, the baseline impacts may be compared to the impacts projected in the plant's original Environmental Report and Environmental Impact Statement. (2) Projections of how the impacts may change during the period of license renewal. The purpose of this information will be to determine the degree to which the projected impacts differ significantly from the impacts presented in the original ER and those that have actually occurred during the period of plant operation. We believe that the ERS will reveal that (1) the actual impacts that have occurred during the period of plant operation are comparable to, or less than, those predicted in the original ER, (2) many impacts have been decreasing with time, such as routine radioactive emissions, and (3) the impacts predicted for the period of license renewal will be comparable to, or less than, the baseline impacts. (author)

  3. Interdisciplinary environmental impact statement examinations with parallel licensing procedures

    International Nuclear Information System (INIS)

    Gassner, E.

    1990-01-01

    The article investigates the question how the interdisciplinary, collective, integrative environmental impact statement can predominate the decisions in individual licensing procedures. It illustrates the requirements of the Act on Environmental Impact Statements. According to this Act, measures are to be found which deal with the overall complex, i.e. the entire system. In the article, the monitoring project organization's primary responsibility is emphasized: Analysis and prognosis of a project's environmental impacts are transferred to this organization for decision-preparation. Subsequent corrections or supplementations during the official approval procedure, or incorporation of the public through the authorities, do not change the matter. An all-comprehensive assessment must be based on all-comprehensive standards. From the point of view of immissions this is minimization of adverse effects on the nature cycle and landscape matters; from the point of view of emissions it is the duty of environment-compatible waste management within the sense of waste management legislation having to serve public welfare. (orig.) [de

  4. 47 CFR 80.53 - Application for a portable ship station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a portable ship station license... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.53 Application for a portable ship station license. The Commission may grant a license permitting operation of a...

  5. 75 FR 8754 - Notice of Environmental Assessment Related to the Issuance of a License Amendment to Masters...

    Science.gov (United States)

    2010-02-25

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 030-34325; NRC-2010-0068] Notice of Environmental Assessment Related to the Issuance of a License Amendment to Masters Materials License 03-23853-01VA, for Unrestricted Release of a Department of Veterans Affairs Facility in Gainesville, FL AGENCY: Nuclear Regulatory Commission. ACTION: Issuance of...

  6. New Jersey's license plate decal requirement for graduated driver licenses: attitudes of parents and teenagers, observed decal use, and citations for teenage driving violations.

    Science.gov (United States)

    McCartt, Anne T; Oesch, Nathan J; Williams, Allan F; Powell, Tara Casanova

    2013-01-01

    On May 1, 2010, New Jersey implemented a law requiring teenagers with learner's permits or probationary licenses to display reflective decals on the front and rear license plates when they drive. The current study examined attitudes of parents and teenagers toward this requirement, use of decals, and reported violations and police enforcement of the graduated driver license law. Statewide telephone surveys of representative samples of parents and teenagers were conducted in February to April 2010 and March to June 2011. Use of decals among probationary license holders was observed at 4 high schools in fall 2010 and in spring 2011 and hand-out surveys were distributed. Data on citations issued for violations of the graduated driver license law were obtained. When interviewed in spring 2011, a large majority of parents of probationary license holders, parents of learner's permit holders, and teenagers with probationary licenses disapproved of decals for probationary licenses. About two thirds of both sets of parents and about half of teenagers disapproved of decals for learner's permits. Support for decals for both license types declined significantly from 2010 to 2011. For parents and teenagers alike, opposition was mainly attributed to concern about identifying and/or targeting teenage drivers by other drivers, predators, or police. In 2011, 77 percent of parents of probationary license holders said that their teenagers had decals for the vehicles driven most often; 46 percent said their teenagers always used decals. Fifty-six percent of parents of learner's permit holders said that their teenagers had decals for the vehicles driven most often; 37 percent said that their teenagers always used decals. Teenagers' reported violations of license restrictions either increased or were similar in 2011 compared to 2010. Observed rates of decal use by probationary license holders at high schools in spring 2011 ranged from 24 to 64 percent. The number of statewide citations

  7. Environmental licensing of nuclear facilities: compatibility of technical competencies

    International Nuclear Information System (INIS)

    Shu, J.; Paiva, R.L.C. de; Mezrahi, A.; Cardoso, E.M.; Aquino, W.P.; Deppe, A.L.; Menezes, R.M.; Prado, V.; Franco, N.M.F.L.; Nouailhetas, Y.; Xavier, A.M.

    1996-01-01

    The Brazilian Nuclear Energy Commission (CNEN) has the technical competency for diagnosing environmental radiological impacts, as well as evaluating the safety and requiring adequate control of the facilities which, due to their activities, represent a potential risk of radiological contamination for the environment. The institution is responsible for emission of radioprotection guidelines, controls and surveys in nuclear safety according to the country's regulations and international recommendations. The methodology to assure the limitation of radiation exposure is consequence from shared control over the nuclear activities, in special the nuclear facilities. According to the Federal Constitution of 1988, the nuclear activities must be under exclusive control of the Union in special related to the nuclear policies, economical, laboral and nuclear safety aspects, while the health and environmental controls of these activities are shared by the Federation, Union, States, Federal District and Counties. The controls related to specific aspects have to be harmonized in such a way to be optimized and effective. In this paper the results of compatibilization of nuclear legislation and environmental legislation are presented aiming to optimize the licensing of nuclear facilities. (author)

  8. The need for legislative framework (licensing)

    International Nuclear Information System (INIS)

    Krech, H.

    1977-01-01

    For reasons of public acceptance the basis of a licensing system should be laid down in a law, details can be fixed in regulations below the law-level. The competence for licensing nuclear installations should be attributed to one body, which is not a the same time charged with the promotion of nuclear energy. The licensing authority has to be provided with sufficient technical advice, given by experts organized in advisory bodies. Normally a licensing procedure is split into several steps (site approval, construction permit, operation licence), each step can be subdivided. Some general aspects of licensing conditions (personal, technical and financial) as well as of the licensing procedure are outlined. The participation of the public is of particular importance but also involves most intricate problems. The paper concludes with some critical remarks on the role of administrative courts with respect to the licensing of nuclear power plants. (orig.) [de

  9. 78 FR 43183 - Notice of Availability for Sharpe Permit Relinquishment Project Environmental Assessment Finding...

    Science.gov (United States)

    2013-07-19

    ... for Sharpe Permit Relinquishment Project Environmental Assessment Finding of No Significant Impact... Relinquishment Project Environmental Assessment (EA) Finding of No Significant Impact (FONSI). SUMMARY: On April... environment. Human environment was interpreted comprehensively to include the natural and physical environment...

  10. Legal aspects of public participation in the planning/licensing of environmentally related large-scale projects

    International Nuclear Information System (INIS)

    Kurz, A.

    1991-01-01

    A variety of legal problems arise in the planning/licensing of environmentally related large-scale projects associated with the control and evaluation of technical conditions and the ramifications in social and legal policy of the acceptance of, and resistance to, such projects. On the basis of a number of partial studies e.g. of the licensing procedure of a nuclear power plant (Neckar-2 reactor) the author examines the legal aspects of public participation in the administrative procedures of licensing/plans approval. The dichotomy of law and technology is covered, and public participation in administrative procedures is derived legally from the basic constitutional rights and the principle of fair hearing. After an outline of specific administrative procedures, public participation as part of administrative procedures is included in the broad legal framework of licensing/plans approval of environmentally related large-scale projects. The author concludes that public participation, within the framework of the basic decisions established by legislature, is not a tool to be used in deciding basic political conflicts. Instead, public participations in the application of law serves to protect the rights of the individual by ensuring fair proceedings paying attention to the subjective rights of the individual. As it is unable to decide political conflicts, it is also an unsuitable means of establishing of basic societal consensus, or of seeking acceptance of large-scale projects. (orig./HP) [de

  11. 77 FR 26989 - Commercial Driver's License Testing and Commercial Learner's Permit Standards

    Science.gov (United States)

    2012-05-08

    ... [Docket No. FMCSA-2007-27659] RIN 2126-AB02 Commercial Driver's License Testing and Commercial Learner's... effective on July 8, 2011. That final rule amended the commercial driver's license (CDL) knowledge and skills testing standards and established new minimum Federal standards for States to issue the commercial...

  12. Empirical Study of Car License Plates Recognition

    OpenAIRE

    Dina, Nasa Zata; Dailey, Matthew

    2015-01-01

    The number of vehicles on the road has increased drastically in recent years. The license plate is an identity card for a vehicle. It can map to the owner and further information about vehicle. License plate information is useful to help traffic management systems. For example, traffic management systems can check for vehicles moving at speeds not permitted by law and can also be installed in parking areas to se-cure the entrance or exit way for vehicles. License plate recognition algorithms ...

  13. Licensing of nuclear facilities according to the Bulgarian Act on the Safe Use of Nuclear Energy

    International Nuclear Information System (INIS)

    Stoyanova-Todorova, P.

    2004-01-01

    The new Bulgarian Act on the Safe Use of Nuclear Energy /Nuclear Act/ has replaced the former Act on the Use of Nuclear Energy for Peaceful Purposes. The new Nuclear Act covers the activities involving nuclear energy and sources of ionising radiation mainly by establishing a consistent licensing regime. About 13 regulations specifying the provisions of the Nuclear Act have been recently adopted by the Council of Ministers, the most important one being the Regulation on the Procedure for Issue of Licenses and Permits for the Safe Use of Nuclear Energy. The Chairman of the Nuclear Regulatory Agency (NRA) is authorised by the law to consider any application for issue of a license or a permit under the Bulgarian Nuclear Act. The procedure starts with an application, filed with the NRA, and continues about nine months. The final decision could be for issuing of the license or permit or a refusal for issuing the claimed document. The denial must be grounded and is subject to appeal. The Nuclear Act prescribes the conditions for issuing of two types of licensing documents (authorisations): licenses and permits. From a legal point of view the two types of licensing documents have one and the same nature - they are individual administrative acts according to the Bulgarian law. That is why there is no difference between them in terms of the issuing procedure. The difference between licenses and permits could be explained as follows: while a license is issued for reiterated activities, a permit is issued for non-reoccurring activities, this division being a specific feature of the Bulgarian Nuclear Act. In the field of nuclear facilities usage only one type of license is provided for by the Nuclear Act - a license for operation of a nuclear facility unit. For the rest of the activities issuing of permits is envisaged, those permits being in compliance with the main stages of the authorisation process formulated by the IAEA, following the step-by-step approach - siting, design

  14. License renewal

    International Nuclear Information System (INIS)

    Newberry, S.

    1993-01-01

    This article gives an overview of the process of license renewal for nuclear power plants. It explains what is meant by license renewal, the significance of license renewal, and goes over key elements involved in the process of license renewal. Those key elements are NRC requirements embodied in 10 CFR Part 54 (Reactor Safety) and 10 CFR Part 51 (Environmental Issues). In addition Industry Reports must be developed and reviewed. License renewal is essentially the process of applying for a 20 year extension to the original 40 year operating license granted for the plant. This is a very long term process, which involves a lot of preparation, and compliance with regulatory rules and guidelines. In general it is a process which is expected to begin when plants reach an operating lifetime of 20 years. It has provisions for allowing the public to become involved in the review process

  15. Regulatory analysis for amendments to regulations for the environmental review for renewal of nuclear power plant operating licenses. Final report

    International Nuclear Information System (INIS)

    1996-05-01

    This regulatory analysis provides the supporting information for a proposed rule that will amend the Nuclear Regulatory Commission's environmental review requirements for applications for renewal of nuclear power plant operating licenses. The objective of the proposed rulemaking is to improve regulatory efficiency by providing for the generic evaluation of certain environmental impacts associated with nuclear plant license renewal. After considering various options, the staff identified and analyzed two major alternatives. With Alternative A, the existing regulations would not be amended. This option requires that environmental reviews be performed under the existing regulations. Alternative B is to assess, on a generic basis, the environmental impacts of renewing the operating license of individual nuclear power plants, and define the issues that will need to be further analyzed on a case-by-case basis. In addition, Alternative B removes from NRC's review certain economics-related issues. The findings of this assessment are to be codified in 10 CFR 51. The staff has selected Alternative B as the preferred alternative

  16. 76 FR 52656 - Rhode Island Department of Environmental Management; Notice of Preliminary Permit Application...

    Science.gov (United States)

    2011-08-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14211-000] Rhode Island Department of Environmental Management; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On June 10, 2011, the Rhode Island Department of Environmental Management...

  17. Variations in teenage activities with and without a driver's license.

    Science.gov (United States)

    Preusser, D F; Leaf, W A; Ferguson, S A; Williams, A F

    2000-01-01

    High school students were surveyed every 6 months from their freshman through senior years concerning licensing, driving, and transportation to and from their various activities. Students in Delaware (learner's permit can be issued at age 15 years, 10 months; driver's license at age 16) were compared with students in Connecticut and New York (permit at age 16; license at age 16) and in New Jersey (license at age 17). During the junior year, most Delaware students, some New York and Connecticut students, and few New Jersey students were licensed. However, even during the junior year, students in the respective states did not differ significantly with respect to time spent at activities such as a paying job, homework, watching television, dating, parties, being with friends, talking on the phone, or participating in sports or school activities. Graduated licensing systems can delay full-privilege teenage licensure and reduce teenage crash rates. These systems also can increase the number of times parents and others must drive. However, the present study's results indicate that licensing delays of as much as 1 year have minimal effects on the nondriving activities of high school students.

  18. Environmental standard review plan for ES Section 7.1.1. Environmental impacts of postulated accidents involving releases of radioactive materials to groundwater

    International Nuclear Information System (INIS)

    1985-11-01

    Environmental Standard Review Plan (ESRP) 7.1.1 provides guidance to the staff for preparation of environmental assessments of ''Radiological Impacts - Releases to Groundwater,'' an input to the staff's environmental statement which addresses the groundwater pathway consequences from postulated reactor core-melt accidents. The ESRP lists the type of information which should be collected, references that may be useful, and provides a procedure for uniform staff review of applicant analyses. The ESRP is applicable to both Construction Permit and Operating License Stage reviews

  19. May compact storage facilities be licensed

    International Nuclear Information System (INIS)

    Gleim, A.; Winter, G.

    1980-01-01

    The authors examine as potential statements fo fact for licensing so-called compact storage facilities for spent fuel elements Sec. 6 to 9c of the German Atomic Energy Act and Sec. 4 of the German Radiation Protection Ordinance. They find that none of these provisions were applicable to compact stroage facilities. In particular, the storage of spent fuel elements was no storage of nuclear fuels licensable under Sec. 6 of the Atomic Energy Act, because Sec. 6 did not cover spent fuel elements. Also in the other wording of the Atomic Energy Act there was no provision, which could be used as a statement of fact for licensing compact storage facilities. Such facilities could not be licensed and, for that reason, were not permitted. (IVR) [de

  20. 76 FR 59423 - Drakes Bay Oyster Company Special-Use Permit, Draft Environmental Impact Statement, Point Reyes...

    Science.gov (United States)

    2011-09-26

    ... commercial production, harvesting, processing, and sale of shellfish at Point Reyes National Seashore. The... Bay Oyster Company Special-Use Permit, Draft Environmental Impact Statement, Point Reyes National... Drakes Bay Oyster Company Special-use permit in Drakes Estero, Point Reyes National Seashore, California...

  1. NUPLEX Licensing Subcommittee

    International Nuclear Information System (INIS)

    Edwards, D.W.; Allen, S.R.

    1988-01-01

    The NUPLEX Licensing Subcommittee was organized to seek a formal license renewal mechanism that institutionalizes the current licensing basis and consequent level of safety of a plant as the legitimate standard for acceptance and approval of an application for extended operation. Along with defining the most workable approach to and scope of review for license renewal, this paper explains the reasons why a regulatory framework is needed by the early 1990s. The initial results of development work on two key issues, licensing criteria and hearing process, are also presented. at this point six potential license renewal criteria have emerged: evaluation of existing monitoring/maintenance programs, revalidation of current licensing basis, conformance to special regulations, evaluation to a safety goal, plant performance history, and environmental assessment. The work on a hearing process has led to the development of two models for future consideration: hybrid legislative and hybrid adjudicatory

  2. 50 CFR 697.24 - Exempted waters for Maine State American lobster permits.

    Science.gov (United States)

    2010-10-01

    ... lobster permits. 697.24 Section 697.24 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT... lobster permits. A person or vessel holding a valid permit or license issued by the State of Maine that lawfully permits that person to engage in commercial fishing for American lobster may, with the approval of...

  3. License renewal process

    International Nuclear Information System (INIS)

    Fable, D.; Prah, M.; Vrankic, K.; Lebegner, J.

    2004-01-01

    The purpose of this paper is to provide information about license renewal process, as defined by Nuclear Regulatory Commission (NRC). The Atomic Energy Act and NRC regulations limit commercial power reactor licenses to an initial 40 years but also permit such licenses to be renewed. This original 40-year term for reactor licenses was based on economic and antitrust considerations not on limitations of nuclear technology. Due to this selected time period; however, some structures and components may have been engineered on the basis of an expected 40-year service life. The NRC has established a timely license renewal process and clear requirements codified in 10 CFR Part 51 and 10 CFR Part 54, that are needed to assure safe plant operation for extended plant life. The timely renewal of licenses for an additional 20 years, where appropriate to renew them, may be important to ensuring an adequate energy supply during the first half of the 21st Century. License renewal rests on the determination that currently operating plants continue to maintain adequate levels of safety, and over the plant's life, this level has been enhanced through maintenance of the licensing bases, with appropriate adjustments to address new information from industry operating experience. Additionally, NRC activities have provided ongoing assurance that the licensing bases will continue to provide an acceptable level of safety. This paper provides additional discussion of license renewal costs, as one of key elements in evaluation of license renewal justifiability. Including structure of costs, approximately value and two different approaches, conservative and typical. Current status and position of Nuclear Power Plant Krsko, related to license renewal process, will be briefly presented in this paper. NPP Krsko is designed based on NRC Regulations, so requirements from 10 CFR 51, and 10 CFR 54, are applicable to NPP Krsko, as well. Finally, this paper will give an overview of current status of

  4. Legal aspects of public participation in the planning/licensing of environmentally related large-scale projects

    International Nuclear Information System (INIS)

    Kurz, A.

    1992-02-01

    A variety of legal problems arise in the planning/licensing of environmentally related large-scale projects associated with the control and evaluation of technical conditions and the ramifications in social and legal policy of the acceptance of, and resistance to, such projects. On the basis of a number of partial studies e.g. of the licensing procedure of a nuclear power plant (Neckar-2 reactor), the author examines the legal aspects of public participation in the administrative procedure of licensing/plans approval. The dichotomy of law and technology is covered, and public participation in administrative procedures is derived legally from the basic constitutional rights and the principle of fair hearing. After an outline of specific administrative procedures, public participation as part of administrative procedures is included in the broad legal framework of licensing/plans approval of environmentally related large-scale projects. The author concludes that public participation, within the framework of the basic decisions established by legislature, is not a tool to be used in deciding basic political conflicts. Instead, public participations in the application of law serves to protect the rights of the individual by ensuring fair proceedings paying attention to the subjective rights of the individual. As it is unable to decide political conflicts, it is also an unsuitable means of establishing of basic societal consensus, or of seeking acceptance of large-scale projects. This is reflected also in studies of the legal functions of public participation, according to which the lawfulness of procedures is observed without, however, the legitimacy of the project being achieved. (orig./HP) [de

  5. Permitting mixed waste treatment, storage and disposal facilities: A mixed bag

    International Nuclear Information System (INIS)

    Ranek, N.L.; Coalgate, J.L.

    1995-01-01

    The Federal Facility Compliance Act of 1992 (FFCAct) requires the U.S. Department of Energy (DOE) to make a comprehensive national inventory of its mixed wastes (i.e., wastes that contain both a hazardous component that meets the Resource Conservation and Recovery Act (RCRA) definition of hazardous waste and a radioactive component consisting of source, special nuclear, or byproduct material regulated under the Atomic Energy Act (AEA)), and of its mixed waste treatment technologies and facilities. It also requires each DOE facility that stores or generates mixed waste to develop a treatment plan that includes, in part, a schedule for constructing units to treat those wastes that can be treated using existing technologies. Inherent in constructing treatment units for mixed wastes is, of course, permitting. This paper identifies Federal regulatory program requirements that are likely to apply to new DOE mixed waste treatment units. The paper concentrates on showing how RCRA permitting requirements interrelate with the permitting or licensing requirements of such other laws as the Atomic Energy Act, the Clean Water Act, and the Clean Air Act. Documentation needed to support permit applications under these laws are compared with RCRA permit application documentation. National Environmental Policy Act (NEPA) documentation requirements are also addressed, and throughout the paper, suggestions are made for managing the permitting process

  6. The Finnish Experience with the Construction of Onkalo. Licensing of a repository for nuclear waste in Finland

    International Nuclear Information System (INIS)

    Avolahti, Jaana

    2014-01-01

    construction of a final disposal repository is subject to a construction license granted by the Government. Prerequisites for granting the construction license include the requirement that the plans concerning the facility be sufficient in terms of safety, that the protection of workers and the population's safety have been taken into account appropriately when planning the operations, that the location is appropriate with respect to the planned operations, and that environmental protection measures have been taken into consideration in an appropriate manner in the planning of operations. In addition, the construction of a final disposal repository and an encapsulation plant requires a number of other permits and licenses, such as permits in accordance with the Environmental Protection Act and the Water Act, and a municipal building permit. A construction license for the final disposal repository of spent nuclear fuel must be applied for by the end of the year 2012. A hearing procedure involving municipalities, authorities and citizens will be established during the application process for the construction license. The operation of a nuclear facility requires an operating license issued by the Government. In order to receive a license, it must be ensured that the protection of workers, safety and environmental protection have been taken into account as appropriate. Furthermore, for instance, licenses in accordance with the legislation regulating the transport of hazardous substances are required for the purpose of transporting spent nuclear fuel. The operating license will be granted only for a fixed term. A hearing procedure involving municipalities, authorities and citizens will be established during the operating license application process

  7. The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Wave Energy Devices

    Energy Technology Data Exchange (ETDEWEB)

    Copping, Andrea E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Geerlofs, Simon H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hanna, Luke A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-06-01

    Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data all add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects. Costs have been developed at the pilot scale and for commercial arrays for a surge wave energy converter

  8. 48 CFR 52.236-7 - Permits and Responsibilities.

    Science.gov (United States)

    2010-10-01

    ... obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws... negligence. The Contractor shall also be responsible for all materials delivered and work performed until...

  9. 18 CFR 4.106 - Standard terms and conditions of case-specific exemption from licensing.

    Science.gov (United States)

    2010-04-01

    ... LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power... licensing. Any case-specific exemption from licensing granted for a small hydroelectric power project is... falsehoods were made by or on behalf of the applicant. (h) Article 8. Any exempted small hydroelectric power...

  10. NUMARC view of license renewal criteria

    International Nuclear Information System (INIS)

    Edwards, D.W.

    1989-01-01

    The Atomic Energy Act and the implementing regulations of the US Nuclear Regulatory Commission (NRC) permit the renewal of nuclear plant operating licenses upon expiration of their 40-year license term. However, the regulatory process by which license renewal may be accomplished and the requirements for the scope and content of renewal applications are yet to be established. On August 29, 1988, the NRC published an Advanced Notice of Proposed Rulemaking regarding the subject of license renewal. This Advanced Notice and the NUREG which it references, NUREG-1317, Regulatory Options for Nuclear Plant License Renewal, provide the most recent regulatory thought on this issue. The basic issue addressed by NUREG-1317 is the definition of an adequate licensing basis for the renewal of a plant license. The report contemplates three alternatives in this regard. This paper discusses each of these three proposals. The NUMARC NUPLEX Working Group endorses a license renewal process based on a plant's current licensing basis along with an evaluation of the pertinent components, systems, and structures affected by age-related degradation. The NUMARC NUPLEX Working group believes that an appropriate scope for NRC review of the license renewal application should focus on those safety-significant structures systems, and components subject to significant age-related degradation that are not subject to existing recognized effective replacement, refurbishment, or inspection programs. The paper also briefly discusses NUMARC's view of the role of the Backfit Rule in the license renewal process

  11. The Environmental Impact Statement and its role in the nuclear licensing procedure

    International Nuclear Information System (INIS)

    Dolde, K.P.

    1995-01-01

    The author discusses the implementation in Germany of the EC Directive on Environmental Impact Statements in the light of the legal tradition and concepts of law in Germany, especially in the context of the nuclear licensing procedure. His analysis reveals some legal provisions and legal concepts in existing German law that will have to be ''sacrificed'' in order to do justice to the European Union, as in the formation of the body of EC law governing environmental issues, the Anglo-Saxon approach to regulatory law has been the prevailing line of orientation (the EU ecological audit being an example). On the whole, however, the implementation of the EU Directive will not lead to substantial changes beyond procedural modifications. (HP) [de

  12. NRC's license renewal regulations

    International Nuclear Information System (INIS)

    Akstulewicz, Francis

    1991-01-01

    In order to provide for the continuity of the current generation of nuclear power plant operating licenses and at the same time ensure the health and safety of the public, and the quality of the environment, the US Nuclear Regulatory Commission (NRC) established a goal of developing and issuing regulations and regulatory guidance for license renewal in the early 1990s. This paper will discuss some of those activities underway to achieve this goal. More specifically, this paper will discuss the Commission's regulatory philosophy for license renewal and the two major license renewal rule makings currently underway. The first is the development of a new Part 54 to address procedural and technical requirements for license renewal; the second is a revision to existing Part 51 to exclude environmental issues and impacts from consideration during the license renewal process. (author)

  13. EMPIRICAL STUDY OF CAR LICENSE PLATES RECOGNITION

    Directory of Open Access Journals (Sweden)

    Nasa Zata Dina

    2015-01-01

    Full Text Available The number of vehicles on the road has increased drastically in recent years. The license plate is an identity card for a vehicle. It can map to the owner and further information about vehicle. License plate information is useful to help traffic management systems. For example, traffic management systems can check for vehicles moving at speeds not permitted by law and can also be installed in parking areas to se-cure the entrance or exit way for vehicles. License plate recognition algorithms have been proposed by many researchers. License plate recognition requires license plate detection, segmentation, and charac-ters recognition. The algorithm detects the position of a license plate and extracts the characters. Various license plate recognition algorithms have been implemented, and each algorithm has its strengths and weaknesses. In this research, I implement three algorithms for detecting license plates, three algorithms for segmenting license plates, and two algorithms for recognizing license plate characters. I evaluate each of these algorithms on the same two datasets, one from Greece and one from Thailand. For detecting li-cense plates, the best result is obtained by a Haar cascade algorithm. After the best result of license plate detection is obtained, for the segmentation part a Laplacian based method has the highest accuracy. Last, the license plate recognition experiment shows that a neural network has better accuracy than other algo-rithm. I summarize and analyze the overall performance of each method for comparison.

  14. Title V Permitting Statistics Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Title V Permitting Statistics Inventory contains measured and estimated nationwide statistical data, consisting of counts of permitted sources, types of permits...

  15. The HOR core conversion program development and licensing experiences

    International Nuclear Information System (INIS)

    Vries, J.W. de; Gibcus, H.P.M.; Leege, P.F.A. de

    1997-01-01

    This paper deals with the experiences in the development of a fuel conversion program for a 2 MW university type research reactor, the HOR. It gives an overview of the technical and administrative aspects concerning the fuel conversion program development since the eighties, including the safety review and licensing process. The overall final safety report was submitted in 1995, together with the environmental impact report, and a licence application was submitted accordingly. The licence permitting the conversion was issued in 1996, coming into force at the beginning of this year, although an appeal case is still pending. At the moment the necessary preparations for starting the actual conversion of the HOR are made. The general program characteristics are addressed. (author)

  16. Policy development for environmental licensing and biodiversity offsets in Latin America.

    Directory of Open Access Journals (Sweden)

    Ana Villarroya

    Full Text Available Attempts to meet biodiversity goals through application of the mitigation hierarchy have gained wide traction globally with increased development of public policy, lending standards, and corporate practices. With interest in biodiversity offsets increasing in Latin America, we seek to strengthen the basis for policy development through a review of major environmental licensing policy frameworks in Argentina, Brazil, Chile, Colombia, Mexico, Peru and Venezuela. Here we focused our review on an examination of national level policies to evaluate to which degree current provisions promote positive environmental outcomes. All the surveyed countries have national-level Environmental Impact Assessment laws or regulations that cover the habitats present in their territories. Although most countries enable the use of offsets only Brazil, Colombia, Mexico and Peru explicitly require their implementation. Our review has shown that while advancing quite detailed offset policies, most countries do not seem to have strong requirements regarding impact avoidance. Despite this deficiency most countries have a strong foundation from which to develop policy for biodiversity offsets, but several issues require further guidance, including how best to: (1 ensure conformance with the mitigation hierarchy; (2 identify the most environmentally preferable offsets within a landscape context; (3 determine appropriate mitigation replacement ratios; and (4 ensure appropriate time and effort is given to monitor offset performance.

  17. Policy development for environmental licensing and biodiversity offsets in Latin America.

    Science.gov (United States)

    Villarroya, Ana; Barros, Ana Cristina; Kiesecker, Joseph

    2014-01-01

    Attempts to meet biodiversity goals through application of the mitigation hierarchy have gained wide traction globally with increased development of public policy, lending standards, and corporate practices. With interest in biodiversity offsets increasing in Latin America, we seek to strengthen the basis for policy development through a review of major environmental licensing policy frameworks in Argentina, Brazil, Chile, Colombia, Mexico, Peru and Venezuela. Here we focused our review on an examination of national level policies to evaluate to which degree current provisions promote positive environmental outcomes. All the surveyed countries have national-level Environmental Impact Assessment laws or regulations that cover the habitats present in their territories. Although most countries enable the use of offsets only Brazil, Colombia, Mexico and Peru explicitly require their implementation. Our review has shown that while advancing quite detailed offset policies, most countries do not seem to have strong requirements regarding impact avoidance. Despite this deficiency most countries have a strong foundation from which to develop policy for biodiversity offsets, but several issues require further guidance, including how best to: (1) ensure conformance with the mitigation hierarchy; (2) identify the most environmentally preferable offsets within a landscape context; (3) determine appropriate mitigation replacement ratios; and (4) ensure appropriate time and effort is given to monitor offset performance.

  18. Nuclear law and environmental law in the licensing of nuclear installations

    International Nuclear Information System (INIS)

    Raetzke, Christian

    2013-01-01

    Large nuclear installations can have a considerable impact on the environment, both in actual terms, due to the construction and operation of the plant and in potential terms, related to the risk of an accident. A considerable part of the multiple authorisation processes required to develop a large nuclear project is devoted to addressing the possible impact on the environment. Accordingly, environmental protection is not only warranted by requirements and processes arising out of what is generally considered 'environmental law', but also by laws governing the design, siting, construction and operation of nuclear installations. By ensuring prevention and control of radiation releases to the environment, the aspects of nuclear law governing the design, construction, operation and decommissioning of nuclear facilities pertain to the field of environmental protection just like other fields of environmental law. The perception of the public that nuclear energy is 'anti-environmental' and the generally antinuclear stance of environmental non-governmental organisations (NGOs) should not deflect attention from the fact that protection of the environment is one of the main functions of the body of nuclear law. In this article, the general relationship between the law governing civil nuclear installations and environmental law will be analysed. The subsequent chapters will deal with environmental requirements and procedures as part of the authorisation process for a nuclear installation. The role of public participation and the involvement of neighbouring states in the licensing process will also be investigated, as they are today mainly based on environmental law. Some other aspects which may also have some relation to environmental protection, such as waste management, emergency planning, multinational early notification and assistance in the case of an accident and nuclear liability, have been omitted from discussion as they lie outside the focus of this article

  19. Environmental assessment for renewal of source material license No. STB-401 (Docket No. 40-6563)

    International Nuclear Information System (INIS)

    1987-04-01

    This Environmental Assessment contains an assessment of the environmental impact associated with the renewal of the license to operate the Columbian-Tantalum (Cv-Ta) Plant of Mallinckrodt, Inc. at St. Louis, Missouri, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51 (10 CFR Part 51), as amended, of the Nuclear Regulatory Commission regulations. This assessment examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with plant operation. Operational impacts are not anticipated on terrestrial and aquatic ecological resources (including endangered or threatened species) nor on historic and archaeological sites. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project related to land use and employment are anticipated to be minimal

  20. Licensing experience of the HTR-10 test reactor

    International Nuclear Information System (INIS)

    Sun, Y.; Xu, Y.

    1996-01-01

    A 10MW high temperature gas-cooled test reactor (HTR-10) is now being projected by the Institute of Nuclear Energy Technology within China's National High Technology Programme. The Construction Permit of HTR-10 was issued by the Chinese nuclear licensing authority around the end of 1994 after a period of about one year of safety review of the reactor design. HTR-10 is the first high temperature gas-cooled reactor (HTGR) to be constructed in China. The purpose of this test reactor project is to test and demonstrate the technology and safety features of the advanced modular high temperature reactor design. The reactor uses spherical fuel elements with coated fuel particles. The reactor unit and the steam generator unit are arranged in a ''side-by-side'' way. Maximum fuel temperature under the accident condition of a complete loss of coolant is limited to values much lower than the safety limit set for the fuel element. Since the philosophy of the technical and safety design of HTR-10 comes from the high temperature modular reactor design, the reactor is also called the Test Module. HTR-10 represents among others also a licensing challenge. On the one side, it is the first helium reactor in China, and there are less licensing experiences both for the regulator and for the designer. On the other side, the reactor design incorporates many advanced design features in the direction of passive or inherent safety, and it is presently a world-wide issue how to treat properly the passive or inherent safety design features in the licensing safety review. In this presentation, the licensing criteria of HTR-10 are discussed. The organization and activities of the safety review for the construction permit licensing are described. Some of the main safety issues in the licensing procedure are addressed. Among these are, for example, fuel element behaviour, source term, safety classification of systems and components, containment design. The licensing experiences of HTR-10 are of

  1. 77 FR 1501 - Special Purpose Permit Application; Draft Environmental Assessment; Hawaii-Based Shallow-Set...

    Science.gov (United States)

    2012-01-10

    ...-FF01M01000] Special Purpose Permit Application; Draft Environmental Assessment; Hawaii-Based Shallow-Set... the operation of the Hawaii-based shallow-set longline fishery that targets swordfish (Xiphias gladius... albatross, by NMFS in its regulation of the shallow-set longline fishery based in Hawaii. This fishery...

  2. Licensing of the Ignalina NPP

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    Since 1991 State Nuclear Power Safety Inspectorate (VATESI) has regulated Ignalina NPP operation by issuing annual operating permits. Those have been issued following submission of specified documents by the Ignalina NPP that have been reviewed by VATESI. However, according to to the procedures that are now established in the Law on Nuclear Energy and subordinate regulations the use of nuclear energy in the Republic of Lithuania is subject to strict licensing. Therefore a decision about the licence for continued operation of unit 1 should be taken. Licence would be granted by VATESI in cooperation with the Ministry of Health, Ministry of Environment and the institutions of local authorities. Ignalina NPP presented to the VATESI safety analysis report (SAR) with other documents. SAR was made mainly by foreign experts and financed by European Bank for Reconstruction and Development (EBRD). VATESI in this process is supported by western regulators. A special project LAP - Licensing Assistance Project was launched to help VATESI perform licensing according western practices

  3. 2008 Contruction General Permits & Multi-Sector General Permits

    Data.gov (United States)

    U.S. Environmental Protection Agency — View stormwater notices of intent (NOIs) for construction projects under EPA's 2008 Construction General Permit (CGP), for Low Erosivity Waivers (LEWs) submitted...

  4. Environmental impacts of energy gases. A factual handbook. Third edition

    International Nuclear Information System (INIS)

    2000-11-01

    This handbook gives a thorough review of gas fuels, their properties, production, environmental impacts, uses as well as comparisons with other fuels (Biofuels, Petroleum, Coal, Peat). Legislation and rules for Sweden and the European Union are also treated. The book is made up of the following chapters: Introduction, Pollutants, Facts on liquid and solid fuels, Facts on gas fuels, Environmental impacts, Regulations, Air quality, Emission limits, Licensing and permits, Economic incentives, Pollution control technology, Appliances, boilers, engines and power plants, Environmental impacts of the full fuel cycle (LCA), Case studies: heating plants, cogeneration, power plants, power production systems, heavy vehicles, Environmental advantages from introduction of gas fuels, R and D needs, Energy and environmental statistics

  5. Meeting United States re-licensing requirements related to environmental protection using innovative technologies

    International Nuclear Information System (INIS)

    Taft, E.P.; Winchell, F.C.; Cook, T.C.

    1998-01-01

    Procedure for meeting re-licensing requirements related to environmental protection and an overview of several new and emerging technologies regarding the development of ways to prevent fish passage through hydraulic turbines at hydroelectric power dams is described. Fish mortality and injury has long been a concern in the hydroelectric industry and research and development efforts have been ongoing since the 1970s to prevent fish passage through turbines. Several new and emerging technologies are examined that have the potential for wide-spread cost-effective applications

  6. Transforming environmental permitting and compliance policies to promote pollution prevention: Removing barriers and providing incentives to foster technology innovation, economic productivity, and environmental protection. Final report

    International Nuclear Information System (INIS)

    Berg, D.R.; Kerr, R.L.; Fleischer, S.; Gorsen, M.; Harris, E.

    1993-04-01

    The Technology Innovation and Economics (TIE) Committee, a standing committee of EPA's National Advisory Council for Environmental Policy and Technology (NACEPT), has concluded that major changes are needed in federal and state permitting and compliance programs to encourage adoption of practical pollution prevention approaches to environmental protection. The Committee recommends seven major areas for improvement, including: (1) Redesigning permit procedures to encourage regulated facilities to expand multi-media and pollution prevention environmental improvement efforts; (2) Accelerating development and use of innovative pollution prevention technologies and techniques through special permitting and review procedures during RD ampersand D and commercialization phases; (3) Developing and expanding federal and state pollution prevention enforcement initiative; (4) Supporting state initiatives in pollution prevention facility planning; (5) Expanding pollution prevention-related training, educational and technology diffusion efforts to better reach managers in all sectors of the economy; (6) Altering personnel reward systems to encourage EPA staff to champion pollution prevention; (7) Expanding and publicizing the system of national awards honoring outstanding pollution prevention research, training and technology implementation

  7. Nuclear proliferation and civilian nuclear power. Report of the Nonproliferation Alternative Systems Assessment Program. Volume VI. Safety and environmental considerations for licensing

    International Nuclear Information System (INIS)

    1980-06-01

    This volume of the Nonproliferation Alternative Systems Assessment Program report addresses safety and environmental considerations in licensing the principal alternative nuclear reactors and fuel cycles in the United States for large-scale commercial nuclear power plants. In addition, this volume examines the safety and environmental considerations for licensing fuel service centers. These centers, which have been proposed for controlling sensitive fuel-cycle facilities and special nuclear materials, would contain a combination of such facilities as reprocessing plants, fabrication plants, and reactors. For this analysis, two fuel service center concepts were selected - one with power - generating capability and one without

  8. Environmental assessment for renewal and consolidation of Materials License Nos. SNM-362, SMB-405, 08-00566-05, 08-00566-10, and 08-00566-12 (Docket No. 70-398)

    International Nuclear Information System (INIS)

    1985-03-01

    The proposed action for which this Environmental Assessment is prepared is the renewal and consolidation of five nuclear materials licenses for radiological activities at the National Bureau of Standards (NBS) site. These licenses cover most uses of radioactive material at NBS except that controlled by the license for operation of the NBS reactor. The reactor license is not associated with and will not be affected by the currently proposed licensing action

  9. Licensing authority's control of radiation sources and nuclear materials in Brazil

    International Nuclear Information System (INIS)

    Binns, D.A.C.

    2002-01-01

    Full text: The Brazilian Nuclear Energy Commission is the national licensing authority and among its responsibilities is the control of nuclear materials and radiation sources. This control is carried out in three different ways: 1) Control of the import and export of nuclear materials and radiation sources. To be able to import or export any nuclear material or radiation source, the user has to have an explicit permission of the licensing authority. This is controlled by electronic means in which the user has to fill a special form found on the licensing authority's home page, where he has to fill in his name, license number, license number of his radiation protection officer and data of the material to be imported or exported. These data are checked with a data base that contains all the information of the licensed users and qualified personnel before authorization is emitted. The airport authorities have already installed x-ray machines to check all baggages entering or leaving the country. 2) Transport and transfer permit for radiation sources. In order to transport and/or transfer radiations sources and nuclear materials within the country, the user(s) have to submit an application to the licensing authority. The user(s) fill out an application form where he fills in his company's name, licensing I.D., radiation protection officer's name and I.D and identification of the sources involved. These information are checked with the licensing operations data before the operations is permitted. 3) Inspections and radiation monitoring systems. Routine and regulatory inspections are continuously carried out where the user's radiation sources and nuclear materials inventory are checked. Also the physical security and protection of these materials are verified. The installation of monitoring systems is an item that is being discussed with the airport authorities so as to increase the possibilities of detecting any illegal transport of these materials. (author)

  10. Safety Evaluation Report related to the construction permit and operating license for the research reactor at the University of Texas (Docket No. 50-602)

    International Nuclear Information System (INIS)

    1985-05-01

    This Safety Evaluation Report for the application filed by the University of Texas for a construction permit and operating license to construct and operate a TRIGA research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the University of Texas and is located at the university's Balcones Research Center, about 7 miles (11.6 km) north of the main campus in Austin, Texas. The staff concludes that the TRIGA reactor facility can be constructed and operated by the University of Texas without endangering the health and safety of the public

  11. Public participation in the licensing of large-scale projects with environmental impact

    International Nuclear Information System (INIS)

    1989-01-01

    As a rule, public participation in licensing and planning procedures for large-scale projects with environmental impact is as controversial as the projects themselves. Against this background, an interdisciplinary examination of several 'cases' of public participation in administrative procedures with varying legal forms is being conducted in a joint research project run by the Department for Applied Systems Analysis (Karlsruher Nuclear Centre) and the Research Institute for Public Administration at the College for Administrative Sciences in Speyer. The actual course of events and the practical experience of the groups involved (authorities, applicants, objectors, experts) are related to the applicable legal arrangements for public participation. The question to be answered is: which expected and unexpected functions do the procedures actually fulfill and which not. Proposals for the amendment of legal policy could be developed upon the foundation of such a diagnosis. The report contains the results of the 'pilot study' on public participation in the licensing of the nuclear power plant GKN-2 in Neckarwestheim and further contributions on the issue of 'public participation', presented within the framework of a research colloquium at the School for Nuclear Technology/Karlsruhe Nuclear Research Centre. (orig.) [de

  12. ISO 14000 and the nuclear licensing

    International Nuclear Information System (INIS)

    Martins, Nadia Soido Falcao

    1999-01-01

    As concern grows for maintaining and improving the quality of the environment and protecting human health, all the world is turning its attention to the potential environmental in pact of their industrial activities. One of the most important contribution in that way is the International Standard ISO 14000 series. In the utilization of nuclear energy, right from the inception, the safety of personnel, environment and the population has been the basic consideration. Over the years well established licenses criteria have been proposed to limit and control the environmental impact of the plant operation and emergencies situation. In this paper are discussed some specific requirements for implementation of the environmental management system specified by ISO 14000 compared to the environmental requirements for nuclear licensing. (author)

  13. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1

    International Nuclear Information System (INIS)

    1996-02-01

    NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination

  14. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  15. Regulatory guidance for license renewal

    International Nuclear Information System (INIS)

    Thoma, John A.

    1991-01-01

    The proposed 10 CFR Part 54 rule proceduralizes the process for license renewal by identifying both the administrative and technical requirements for a renewal application. To amplify and support this regulation, written guidance has been provided in the form of a draft Regulatory Guide (DG 1009) and a draft Standard Review Plan for License Renewal (NUREG 1299). This guidance is scheduled to be finalized in 1992. Similar guidance will be provided for the proposed revisions to 10 CFR Part 51 concerning the environmental aspects of license renewal. (author)

  16. 40 CFR 158.2174 - Experimental use permit microbial pesticides nontarget organisms and environmental fate data...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Experimental use permit microbial... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS DATA REQUIREMENTS... controls the target insect pest by a mechanism of infectivity; i.e., may create an epizootic condition in...

  17. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2

    International Nuclear Information System (INIS)

    1996-02-01

    NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination

  18. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  19. Environmental issues of repository licensing: an evaluation of a hypothetical high-level radioactive waste repository

    International Nuclear Information System (INIS)

    Owen, J.L.; McGinnis, J.T.; Harper, C.M.; Battelle Columbus Labs., OH)

    1982-01-01

    This paper presents results of an environmental assessment conducted under the direction of the Office of Nuclear Waste Isolation as part of the National Waste Terminal Storage program. The study defined a range of potential environmental effects of constructing, operating, decommissioning, and long-term isolation of a nuclear waste repository. The analytical methodology used to determine potential environmental effects required definition of a hypothetical environmental setting and repository. Potentially applicable regulatory requirements were identified and were used as guidelines to evaluate permitting feasibility. The environmental effects of repository development were analyzed for the two major time periods of concern: short term (the period of construction, operation, and decommissioning) and long term (the isolation period after decommissioning). As a result of this analysis, major environmental uncertainties and issues were identified. 11 references, 5 figures

  20. The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Oscillating Water Column Wave Energy Devices

    Energy Technology Data Exchange (ETDEWEB)

    Copping, Andrea E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Geerlofs, Simon H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hanna, Luke A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data all add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects, as well as expert opinion of marine environmental research professionals. Cost estimates have been developed at the pilot and commercial scale. The reference model described in this document is an oscillating water column device deployed in Northern California at approximately 50 meters water depth.

  1. Environmental Impact Appraisal for renewal of special nuclear material license No. SNM-42 (Docket No. 70-27)

    International Nuclear Information System (INIS)

    1984-03-01

    The Babcock and Wilcox Company (B and W) Naval Nuclear Fuel Division (NNFD) facility near Lynchburg, Virginia, produces fuel assemblies and complete fuel modules for reactors used in the US Navy nuclear propulsion program and fuel components for university and other research reactors; and processes scrap material to recover the enriched uranium content. No significant modifications of the production procedures for the US Navy nuclear fuel fabrication have been made since the previous environmental assessment, and none are anticipated during the five-year license renewal period being considered. In 1982 the fabrication of fuel assemblies for university and other research reactors was begun. This environmental assessment provides a review of the past five years of operation and an analysis of future impacts, including the effect of plant changes. The proposed action is the renewal of the license necessary for B and W to continue the existing fuel fabrication operations. Principal operations in the fabrication facility include the processing of highly enriched uranium (> 90% 235 U) into fuel elements and assembling the elements into complete reactor cores for shipment and eventual installation in US Navy facilities. The principal environmental impacts of current operation of the NNFD result from release of radioactive gases to the atmosphere and of radioactively contaminated liquids to the adjacent James River. The actual gaseous and liquid pollutants released during normal operation of the plant have been monitored and documented. The principal subjects addressed in this environmental assessment include water use, pollutant controls, environmental monitoring, and environmental impact of operation and accidents. Other site factors and plant operations necessary for this assessment are described, and aspects of insignificant impacts are identified. 10 figures, 36 tables

  2. The Swedish radiological environmental protection regulations applied in a review of a license application for a geological repository for spent nuclear fuel.

    Science.gov (United States)

    Andersson, Pål; Stark, Karolina; Xu, Shulan; Nordén, Maria; Dverstorp, Björn

    2017-11-01

    For the first time, a system for specific consideration of radiological environmental protection has been applied in a major license application in Sweden. In 2011 the Swedish Nuclear Fuel & Waste Management Co. (SKB) submitted a license application for construction of a geological repository for spent nuclear fuel at the Forsmark site. The license application is supported by a post-closure safety assessment, which in accordance with regulatory requirements includes an assessment of environmental consequences. SKB's environmental risk assessment uses the freely available ERICA Tool. Environmental media activity concentrations needed as input to the tool are calculated by means of complex biosphere modelling based on site-specific information gathered from site investigations, as well as from supporting modelling studies and projections of future biosphere conditions in response to climate change and land rise due to glacial rebound. SKB's application is currently being reviewed by the Swedish Radiation Safety Authority (SSM). In addition to a traditional document review with an aim to determine whether SKB's models are relevant, correctly implemented and adequately parametrized, SSM has performed independent modelling in order to gain confidence in the robustness of SKB's assessment. Thus, SSM has used alternative stylized reference biosphere models to calculate environmental activity concentrations for use in subsequent exposure calculations. Secondly, an alternative dose model (RESRAD-BIOTA) is used to calculate doses to biota that are compared with SKB's calculations with the ERICA tool. SSM's experience from this review is that existing tools for environmental dose assessment are possible to use in order to show compliance with Swedish legislation. However, care is needed when site representative species are assessed with the aim to contrast them to generic reference organism. The alternative modelling of environmental concentrations resulted in much lower

  3. Environmental-impact appraisal related to special nuclear materials. License No. SNM-696; Docket No. 70-734

    International Nuclear Information System (INIS)

    1983-06-01

    This Environmental Impact Appraisal is issued by the US Nuclear Regulatory Commission in response to an application by GA Technologies, Inc., (GA) for renewal of Special Nuclear Material (SNM) License No. SNM-696 covering plant operations at San Diego, California. The proposed action provides for continuing research, development, and production activities involving SNM, uranium enriched in the U-235 and U-233 isotopes, and plutonium

  4. Development and application of a permit information system for shale oil (PERMISSO). Final report appendix: summary sheets of regulations required for oil shale development, June 1978--May 1979

    Energy Technology Data Exchange (ETDEWEB)

    1979-07-01

    This appendix is comprised of summaries of various governmental permits, licenses and other approvals required for oil shale development. The summaries were completed during the period June--October 1978, and are current as of July 1, 1978, although more recent authority was cited in some cases. One of the major purposes of Phase II of the project will be to update these summaries as statutes and regulations are added, changed or eliminated. This updating will be particularly important in the case of environmental permits and approvals. Many legislative and regulatory changes affecting environmental requirements are pending at this time and will alter many of the summaries herein. In addition, many regulatory proposals have been or likely will be challenged in the courts. When such conflicts are resolved further changes may be in order.

  5. Permit processes for nuclear power. International lessons

    International Nuclear Information System (INIS)

    Gaahlin, Emil; Nilsson, Isabelle; Pettersson, Maria; Soederholm, Patrik

    2010-01-01

    The overall objective of this report is to analyze and compare the legal permitting and planning process for (first and foremost) new nuclear power stations in a number of selected countries. In this way the report provides relevant knowledge that could form the basis for discussing the efficiency of various national licensing processes (include the Swedish one). The study builds heavily on the analysis of legal documents and regulations, and addresses both the formal requirements for licensing and territorial planning procedures as well as the issues of public participation and access to justice in the respective countries. In addition to this legal approach, however, we also adopt an investor's perspective on the legislation, i.e., an analysis of the legal rules can influence investment decisions in practice. Furthermore, the study relies largely on a synthesis of previous studies as well as interviews with researchers, electricity companies and government officials in Sweden and abroad. The countries that are compared include Sweden, Finland, France, Canada, Switzerland, Great Britain, USA and South Korea. These include those that currently invest in new nuclear power as well as those who have recently reformed their plant permitting processes. The analysis highlights important differences among the various countries, including issues such as the political influence on the licensing process, the allocation of political power between the national and local levels, means of interacting with regular citizens, and the overall transparency and predictability of the legislation. Some selected practical experiences of the current legislation are also presented. The report first provides a short background to the role and the status of nuclear power in the global energy system, and we then present a rather comprehensive comparison of the permitting processes in the above countries. Each country section comprises a short background, a presentation of the existing

  6. Public choice and environmental regulation: tradable permit systems in the United States and CO2 taxation in Europe. New Horizons in Environmental Economics series

    DEFF Research Database (Denmark)

    Svendsen, Gert Tinggaard

    Svendsen provides a comprehensive description and assessment of the actual experience with systems of tradable permits for environmental management. Moreover, he puts this treatment in a public-choice framework so that we can understand why policy makers in Europe have chosen green taxes, while t...... their counterparts in the United States have opted for systems of tradable permits. The book is a valuable source for a basic understanding of the theory, the and the political economy of incentive-based policy instruments....

  7. EPA Region 2 Discharge Pipes for Facilites with NPDES Permits from the Permit Compliance GIS Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Permit and Compliance System (PCS) contains data on the National Pollution Discharge Elimination Systems (NPDES) permit-holding facilities. This includes...

  8. Facilities license application record data as of April 1, 1981. Tri-annual report 30 Nov 80-1 Apr 81

    International Nuclear Information System (INIS)

    1981-06-01

    The FLAR is divided into three parts as follows: Part I - The first part is a listing of all operating licenses, authorizations and construction permits in effect plus applications pending; Part II - The second part is a listing of applications that have been withdrawn or denied, and licenses and construction permits terminated or revoked; and Part III - The third part is a listing of research, test and power reactors for export

  9. Public choice and environmental regulation. Tradable permit systems in the United States and CO2 taxation in Europe

    International Nuclear Information System (INIS)

    Tinggaard Svendsen, G.

    1996-05-01

    The thesis raises the question whether taxation or permit markets are most cost-effective in environmental regulation. The general answer given by the author is that a combination of these two economic control measures would minimize the cost of CO 2 abatement. A 'grandfather' permit market can prove to be more cost-effective than a CO 2 tax with regard to organized interests: first because in the near future both industry and electric utilities will experience a growing competition in the common market, secondly because permit markets offer essential results to the environmental organizations. Taxation can come in useful where interests are poorly organized, like in households and transportation sector. Taxes can force environmental improvements through as well as eliminate tax distortion due to income tax reduction. Thus the state has a strong economic interest in development of economic incentive measures, increasing production and exports. The use of a comparative method and the rationale for transferring US experience to European ground is considered. CO 2 taxation in Denmark and the failed attempt to introduce a common CO 2 tax in the EU is analyzed. Perspectives of a CO 2 market on an EU scale and global scale are discussed. (EG) 139 refs

  10. NRC analysis of the environmental impacts and licensing policies for expanded spent fuel storage in the United States

    International Nuclear Information System (INIS)

    Smith, C.V. Jr.

    1978-01-01

    This paper reviews the findings of the U.S. environmental impact studies on spent fuel storage to the year 2000, addresses design criteria for independent spent fuel storage installations and expresses the position of the NRC for licensing expanded spent fuel storage capabilities until such time as final solutions are established

  11. Environmental qualification design for NPP refurbishment to comply with revised licensing requirements

    International Nuclear Information System (INIS)

    MacBeth, M. J.; Hemmings, R. L.

    2002-01-01

    Recent Canadian Nuclear Regulatory decisions have imposed Environmental Qualification (EQ) requirements for twenty-four Reactor Building (RB) airlocks at the four-unit Pickering Nuclear Generating Station-B (PNGS-B) facility. This paper describes the EQ modification design work completed by CANATOM-NPM for the problematic aspects for such projects. The airlocks allow RB access while providing a containment boundary and are designed to prevent a potential breach of containment for all analysed station conditions. Each PNGS-B unit has three large equipment airlocks and three smaller personnel airlocks. The airlocks must function under postulated worst-case design basis accident(DBA) conditions for assigned mission durations. The design must ensure that accident conditions cannot spuriously initiate an un-requested door opening. CANATOM-NPM reviewed site data to specify the necessary EQ modifications required to satisfy licensing requirements while providing a correct and complete as-found record of the existing airlock installation. The design team assessed the installed airlocks configuration against environmental qualification requirements to finalize the list of necessary modifications. A comprehensive, cross-discipline review of proposed design changes was completed to identify any further changes required to satisfy the final EQ licensing goal. The design team also conducted a design review of the EQ modification installation strategy to integrate the design deliverables with the installation team requirements while attempting to minimize necessary outage time for EQ modification installations. This project was completed on schedule and within the cost limitations required by the client with comprehensive, high quality final design packages. Overall improvements were realized for OPG system drawings and the electronic documentation of design data. The EQ modifications designed by CANATOM-NPM will ensure the continued operation of the PNGS-B NPP past December 31

  12. 10 CFR 50.43 - Additional standards and provisions affecting class 103 licenses and certifications for...

    Science.gov (United States)

    2010-01-01

    ..., paragraphs (a) through (e) of this section apply in the case of a class 103 license for a facility for the... electric energy, if otherwise qualified, from obtaining a construction permit or operating license under... over a sufficient range of normal operating conditions, transient conditions, and specified accident...

  13. Set of rules SOR 2 licensing of nuclear reactors

    International Nuclear Information System (INIS)

    1976-05-01

    This is the set of rules promulgated by the Israel Atomic Energy Commission pursuant to the Supervision of Supplies and Services Law 5718-1957, Order regarding Supervision of Nuclear Reactors (1974) Chapter 3: Permits, to provide for the Licensing of Nuclear Reactors. (B.G.)

  14. SSM's licensing review of a spent nuclear fuel repository in Sweden

    International Nuclear Information System (INIS)

    Dverstorpand, Bjoern; Stroemberg, Bo

    2014-01-01

    On 16 March 2011 the Swedish Nuclear Fuel and Waste Management Co. (SKB) submitted license applications for a general license to construct, possess and operate a KBS-3 type spent nuclear fuel repository at the Forsmark site, in Oesthammar municipality, and an encapsulation plant in Oskarshamn municipality. The KBS-3 method, which has been developed by SKB over a period of more than 30 years, entails disposing of the spent fuel in copper canisters, surrounded by a swelling bentonite clay, at about 500 m depth in crystalline basement rock. SKB's applications are being evaluated in parallel by the Swedish Radiation Safety Authority (SSM) according to the Act on Nuclear Activities and by the Land and Environmental Court according to the Environmental Code. During the review SSM will act as an expert review body to the Land and Environmental Court in the areas of radiation protection, safety and security/non-proliferation. Both SSM and the court will produce a statement with a recommendation regarding a licensing decision and licensing conditions to the government. The government will make the final decision after consulting the municipalities concerned by SKB's facilities (municipal veto applies). The current licensing decision is just one of several licensing decisions that will be required for the repository. However it is arguably the most important one, because it is the last licensing stage with a broad societal involvement including an environmental impact assessment (EIA) process, national consultations and municipal veto for the concerned municipalities. The licensing steps to follow, should SKB be granted a license by the government, only require approval by SSM. These steps include application for start of actual construction work, test operation and routine operation. (authors)

  15. Early Site Permit Demonstration Program: Recommendations for communication activities and public participation in the Early Site Permit Demonstration Program

    International Nuclear Information System (INIS)

    1993-01-01

    On October 24, 1992, President Bush signed into law the National Energy Policy Act of 1992. The bill is a sweeping, comprehensive overhaul of the Nation's energy laws, the first in more than a decade. Among other provisions, the National Energy Policy Act reforms the licensing process for new nuclear power plants by adopting a new approach developed by the US Nuclear Regulatory Commission (NRC) in 1989, and upheld in court in 1992. The NRC 10 CFR Part 52 rule is a three-step process that guarantees public participation at each step. The steps are: early site permit approval; standard design certifications; and, combined construction/operating licenses for nuclear power reactors. Licensing reform increases an organization's ability to respond to future baseload electricity generation needs with less financial risk for ratepayers and the organization. Costly delays can be avoided because design, safety and siting issues will be resolved before a company starts to build a plant. Specifically, early site permit approval allows for site suitability and acceptability issues to be addressed prior to an organization's commitment to build a plant. Responsibility for site-specific activities, including communications and public participation, rests with those organizations selected to try out early site approval. This plan has been prepared to assist those companies (referred to as sponsoring organizations) in planning their communications and public involvement programs. It provides research findings, information and recommendations to be used by organizations as a resource and starting point in developing their own plans

  16. Environmental, Health and Safety Assessment: ATS 7H Program (Phase 3R) Test Activities at the GE Power Systems Gas Turbine Manufacturing Facility, Greenville, SC

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-11-17

    International Technology Corporation (IT) was contracted by General Electric Company (GE) to assist in the preparation of an Environmental, Health and Safety (HI&3) assessment of the implementation of Phase 3R of the Advanced Turbine System (ATS) 7H program at the GE Gas Turbines facility located in Greenville, South Carolina. The assessment was prepared in accordance with GE's contractual agreement with the U.S. Department of Energy (GE/DOE Cooperative Agreement DE-FC21-95MC3 1176) and supports compliance with the requirements of the National Environmental Policy Act of 1970. This report provides a summary of the EH&S review and includes the following: General description of current site operations and EH&S status, Description of proposed ATS 7H-related activities and discussion of the resulting environmental, health, safety and other impacts to the site and surrounding area. Listing of permits and/or licenses required to comply with federal, state and local regulations for proposed 7H-related activities. Assessment of adequacy of current and required permits, licenses, programs and/or plans.

  17. NRC Analysis of the environmental impacts and licensing policies for expanded spent fuel storage in the United States

    International Nuclear Information System (INIS)

    Clifford, V.S.

    1978-01-01

    The findings of the U.S. environmental impact studies on spent fuel storage to the year 2000 are reviewed, the design criteria for independent spent fuel storage installations are addressed and the position of the NRC for licensing expanded spent fuel storage capabilities, until such time as final solutions are established, is expressed. (author)

  18. Permitting plan for Project W-340, Tank 241-C-106 manipulator retrieval arm

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    This document describes the regulatory requirements and describes alternative strategies for obtaining permits and approvals for Project W-340, Tank 241-C-106 Manipulator Retrieval Arm. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before design, construction, and operation of the facility. The environmental reviews, permits, and approvals, as well the regulatory authority potentially applicable to the Project W-340 Long Reach Manipulator Arm include the following: National Environmental Policy Act of 1969 -- US Department of Energy, Headquarters; State Environmental Policy Act of 1971 -- State of Washington Department of Ecology; Air Permitting; Dangerous Waste Permitting; Miscellaneous Reviews/Permits/Approvals. This document describes the environmental reviews, permits, and approval requirements for the project. It provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the estimated probability of success for each alternative strategy

  19. Licensing aspects regarding the RBMN project

    International Nuclear Information System (INIS)

    Cuccia, Valeria; Sacramento, Arivaldo M.; Aleixo, Bruna L.; Ferreira, Vinicius V.M.

    2013-01-01

    The licensing process of a waste disposal facility is a complex and demanding undertaking. It proceeds in phases, starting with the site selection and ending many decades later, when the radionuclides decayed and no longer offer possible hazard. That is one of the reasons why the licensing process for the Brazilian repository for low and intermediate level radioactive waste (RBMN Project) is a challenge for all the technicians involved. Besides that, the only national experience associated to this subject arose after a radiological accident in the State of Goias, in 1987. Two different institutions are involved in this licensing process: IBAMA, for environmental licensing, and CNEN, for nuclear licensing. Both of them will evaluate the possible impacts caused by the waste disposal, so it is essential to avoid conflicts and duplications of activities. The RBMN project has different teams for each main activity, and one of them is the Licensing group. This team has been planning the licensing activities for the repository, studying the legal framework and estimating costs and execution time for each step. This paper presents the status of the licensing activities regarding to the RBMN project done by the CNEN staff. (author)

  20. Early Site Permit, The Assessment of a Site

    International Nuclear Information System (INIS)

    Copete, M.; Cervantes, E.; Sabate, R.

    2010-01-01

    The vast majority of today's power plants were licensed during the 60s, 70s and 80s. Commercial nuclear energy was new, and the regulatory process evolved along with the new industry. Plants were issued a construction permit based on a preliminary design. Safety issues were not fully resolved until the plant was essentially complete, which meant utilities had high risks of increasing costs and schedule as well as the public did not have access to the details of the design until construction was nearly complete. To address these issues, the U.S. Nuclear Regulatory Commission (NRC) in 1989 established a new licensing process: 10 CFR Part 52.

  1. Public choice and environmental regulation. Tradable permit systems in the United States and CO{sub 2} taxation in Europe

    Energy Technology Data Exchange (ETDEWEB)

    Tinggaard Svendsen, G [The Aarhus School of Business, Dept. of Economics (Denmark)

    1996-05-01

    The thesis raises the question whether taxation or permit markets are most cost-effective in environmental regulation. The general answer given by the author is that a combination of these two economic control measures would minimize the cost of CO{sub 2} abatement. A `grandfather` permit market can prove to be more cost-effective than a CO{sub 2} tax with regard to organized interests: first because in the near future both industry and electric utilities will experience a growing competition in the common market, secondly because permit markets offer essential results to the environmental organizations. Taxation can come in useful where interests are poorly organized, like in households and transportation sector. Taxes can force environmental improvements through as well as eliminate tax distortion due to income tax reduction. Thus the state has a strong economic interest in development of economic incentive measures, increasing production and exports. The use of a comparative method and the rationale for transferring US experience to European ground is considered. CO{sub 2} taxation in Denmark and the failed attempt to introduce a common CO{sub 2} tax in the EU is analyzed. Perspectives of a CO{sub 2} market on an EU scale and global scale are discussed. (EG) 139 refs.

  2. The Atomic Safety and Licensing Board Panel

    International Nuclear Information System (INIS)

    1998-01-01

    Through the Atomic Energy Act, Congress made is possible for the public to get a full and fair hearing on civilian nuclear matters. Individuals who are directly affected by any licensing action involving a facility producing or utilizing nuclear materials may participate in a formal hearing, on the record, before independent judges on the Atomic Safety and Licensing Board Panel (ASLBP or Panel). Frequently, in deciding whether a license, permit, amendment, or extension should be granted to a particular applicant, the Panel members must be more than mere umpires. If appropriate, they are authorized to go beyond the issues the parties place before them in order to identify, explore, and resolve significant questions involving threats to the public health and safety that come to a board's attention during the proceedings. This brochure explains the purpose of the panel. Also addressed are: type of hearing handled; method of public participation; formality of hearings; high-level waste; other panel responsibilities and litigation technology

  3. NRC licensing requirements: DOD options

    International Nuclear Information System (INIS)

    Pike, W.J.; O'Reilly, P.D.

    1982-09-01

    This report describes the licensing process (both safety and environmental) that would apply if the Department of Defense (DOD) chooses to obtain licenses from the US Nuclear Regulatory Commission (NRC) for using nuclear energy for power and luminous sources. The specific nuclear energy sources being considered include: small or medium-size nuclear power reactors; radioisotopic thermoelectric generators with 90 Sr or 238 Pu; radioisotopic dynamic electric generators with 90 Sr or 238 Pu; and applications of radioisotopes for luminous sources (lights) with 3 H, 85 Kr, or 147 Pm. The steps of the licensing process are summarized in the following sections, with particular attention given to the schedule and level of effort necessary to support the process

  4. Moral concerns on tradable pollution permits in international environmental agreements

    Energy Technology Data Exchange (ETDEWEB)

    Eyckmans, Johan [Hogeschool-Universiteit Brussel - HUB, Stormstraat 2, B-1000 Brussels (Belgium); Katholieke Universiteit Leuven, Centrum voor Economische Studien Naamsestraat 69, 3000 Leuven (Belgium); Kverndokk, Snorre [Ragnar Frisch Centre for Economic Research, Gaustadalleen 21, 0349 Oslo (Norway)

    2010-07-15

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  5. Moral concerns on tradable pollution permits in international environmental agreements

    International Nuclear Information System (INIS)

    Eyckmans, Johan; Kverndokk, Snorre

    2010-01-01

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  6. 77 FR 25129 - Environmental Impact Statement for Issuance of a Special Use Permit for the Continued Operation...

    Science.gov (United States)

    2012-04-27

    ... Use Permit for the Continued Operation of the Winchester Canyon Gun Club; Los Padres National Forest... environmental impact statement (EIS). SUMMARY: The USDA, Forest Service, Los Padres National Forest, gives...: Send written comments to: Los Padres National Forest, 6755 Hollister Avenue, Suite 150, Goleta, CA...

  7. Early Site Permit Demonstration Program: Recommendations for communication activities and public participation in the Early Site Permit Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-27

    On October 24, 1992, President Bush signed into law the National Energy Policy Act of 1992. The bill is a sweeping, comprehensive overhaul of the Nation`s energy laws, the first in more than a decade. Among other provisions, the National Energy Policy Act reforms the licensing process for new nuclear power plants by adopting a new approach developed by the US Nuclear Regulatory Commission (NRC) in 1989, and upheld in court in 1992. The NRC 10 CFR Part 52 rule is a three-step process that guarantees public participation at each step. The steps are: early site permit approval; standard design certifications; and, combined construction/operating licenses for nuclear power reactors. Licensing reform increases an organization`s ability to respond to future baseload electricity generation needs with less financial risk for ratepayers and the organization. Costly delays can be avoided because design, safety and siting issues will be resolved before a company starts to build a plant. Specifically, early site permit approval allows for site suitability and acceptability issues to be addressed prior to an organization`s commitment to build a plant. Responsibility for site-specific activities, including communications and public participation, rests with those organizations selected to try out early site approval. This plan has been prepared to assist those companies (referred to as sponsoring organizations) in planning their communications and public involvement programs. It provides research findings, information and recommendations to be used by organizations as a resource and starting point in developing their own plans.

  8. Early Site Permit Demonstration Program: Plant parameters envelope report

    International Nuclear Information System (INIS)

    1993-03-01

    The Early Site Permit (ESP) Demonstration Program is the nuclear industry's initiative for piloting the early resolution of siting-related issues before the detailed design proceedings of the combined operating license review. The ESP Demonstration Program consists of three phases. The plant parameters envelopes task is part of Phase 1, which addresses the generic review of applicable federal regulations and develops criteria for safety and environmental assessment of potential sites. The plant parameters envelopes identify parameters that characterize the interface between an ALWR design and a potential site, and quantify the interface through values selected from the Utility Requirements Documents, vendor design information, or engineering assessments. When augmented with site-specific information, the plant parameters envelopes provide sufficient information to allow ESPs to be granted based on individual ALWR design information or enveloping design information for the evolutionary, passive, or generic ALWR plants. This document is expected to become a living document when used by future applicants

  9. Final environmental statement concerning rule making. Exemption from licensing requirements for spark-gap irradiators that contain cobalt-60. Docket No. PRM 30-54

    International Nuclear Information System (INIS)

    1977-12-01

    The potential environmental impacts and adverse environmental effects from distribution, use only in commercial-sized oil burners, and disposal of 6000 spark-gap irradiators per year that contain 60 Co are summarized. On the basis of the analysis and evaluation set forth in this statement and after weighing the environmental, economic, technical, and other benefits against environmental costs and after considering available alternatives, it is concluded that the action called for under the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51 is the issuance of an exemption from licensing requirements for spark-gap irradiators that contain 60 Co, subject to the following conditions for the protection of the environment: persons who apply 60 Co to, or persons who incorporate 60 Co into, spark-gap irradiators or persons who import for sale or distribution spark-gap irradiators containing 60 Co are not exempt from the requirements for a license; each spark-gap irradiator shall contain no more than 1 μCi of 60 Co; and the 60 Co shall be applied to the spark-gap irradiators for use in electrically ignited fuel-oil burners having a firing rate of at least 3 gal/h

  10. The Monticello license renewal project

    International Nuclear Information System (INIS)

    Clauss, J.M.; Harrison, D.L.; Pickens, T.A.

    1993-01-01

    Today, 111 nuclear power plants provide over 20 percent of the electrical energy generated in the United States. The operating license of the oldest operating plant will expire in 2003, one-third of the existing operating licenses will expire by 2010 and the newest plant's operating license will expire in 2033. The National Energy Strategy (NES) prepared by the Department of Energy (DOE) assumes that 70 percent of the current operating plants will continue to operate beyond their current license expiration. Power from current operating plants can assist in ensuring an adequate, diverse, and environmentally acceptable energy supply for economic growth and improved U.S. competitiveness. In order to preserve this energy resource, three major tasks must be successfully completed: (1) establishment of regulations, technical standards, and procedures for the preparation and review of License Renewal Applications (LRAs); (2) development of technical criteria and bases for monitoring, refurbishing or replacing plant equipment; and (3) demonstration of the regulatory process by a plant obtaining a renewed license. Since 1986, the DOE has been working with the nuclear industry and the Nuclear Regulatory Commission (NRC) to establish and demonstrate the option to extend the life of a nuclear power plant by renewing the operating license. The Monticello Lead Plant demonstration project was initiated in September 1988, following the Pilot Plant studies. This paper is primarily focused on the status and insights gained from the Northern States Power Company (NSP) Monticello Lead Plant demonstration project. The following information is included: (1) Current Status - Monticello License Renewal Application; (2) Economic Analysis; (3) License Renewal Regulatory Uncertainty Issues; (4) Key Decisions; (5) Management Structure; (6) Technical and Licensing Perspective; (7) NRC Interactions; (8) Summary

  11. A strategy for addressing environmental regulations in the 1990s

    International Nuclear Information System (INIS)

    Mason, P.F.

    1990-01-01

    In 1988, an assessment was made concerning environmental regulatory trends and the electric power industry and an eight point environmental permitting strategy and approach was outlined in 1989 to handle the environmental approvals for new power plants in the 1990s. The main features of the suggested strategy included: (1) development of a comprehensive and coordinated approach to environmental permitting, (2) inclusion of all levels of government and appropriate jurisdictions, (3) disclosure of considerably more information than previously required, (4) maintenance of records to allow traceability of issues, technical data, and environmental licensing positions, (5) development of legal and technical reviews and develop positions on a wider range of environmental issues, (6) encourage the development of both a global as well as a project-specific perspective, (7) review of existing plants and projects against contemporary environmental trends and patterns to assure continued compliance, and (8) prepare to entertain more project or facility reviews, audits, inspections and independent reviews. Since then this strategy and approach has been tested on several power and non-power projects and has proven to be a viable and constructive approach to the problem of environmental regulation. This paper summarizes the main features of this strategy and reviews the results of its application to these various projects and reviews its applicability to non-utility power projects

  12. Safety evaluation report related to the construction permit and operating license for the research reactor at the University of Texas (Docket No. 50-602)

    International Nuclear Information System (INIS)

    1992-01-01

    The Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC) has prepared Supplement 1 to NUREG-1135, ''Safety Evaluation Report Related to the Construction Permit and Operating License for the Research Reactor at the University of Texas'' (SER) May 1985. The reactor facility is owned by The University of Texas at Austin (UT, the applicant) and is located at the University's Balcones Research Center in Austin, Texas. This supplement to the SER (SSER) describes the changes to the reactor facility design from the description in the SER. The SER and SSER together reflect the facility as built. The SSER also documents the reviews that the NRC has completed regarding the applicant's emergency plan, security plan, and technical specifications that were identified as open in the SER

  13. 10 CFR 51.107 - Public hearings in proceedings for issuance of combined licenses; limited work authorizations.

    Science.gov (United States)

    2010-01-01

    ... resolved in the early site permit proceeding; or (3) Raises any issue involving the impacts of construction... license hearing shall not admit contentions proffered by any party concerning severe accident mitigation... construction and operation of a nuclear power plant, and a construction permit was issued but construction of...

  14. Environmental Assessment for renewal of Special Nuclear Material License No. SNM-368 (Docket No. 70-371)

    International Nuclear Information System (INIS)

    1985-01-01

    The proposed action is the renewal of the license necessary for UNC to continue the existing fuel fabrication operation. Principal operations in the fabrication facility include the processing of highly enriched uranium (>90% 235 U) into fuel elements and assembling of the elements into complete reactor cores. The present application for renewal involves no major changes in the current authorization and no new facilities are planned. The current operation of the UNC facilities results in the release of radioactive and nonradioactive effluent to the environment. The gaseous and liquid pollutants released during normal operation of the plant have been monitored and documented. The principal subjects addressed in this environmental assessment include water use, pollutant controls, environmental monitoring, and environmental impact of operation and accidents. Other site factors and plant operations necessary for this assessment are described, and aspects of insignificant impacts are identified. 7 figures, 23 tables

  15. Nuclear licensing reform. Hearings before the Subcommittee on Energy and the Environment, House of Representatives, Ninety-Eighth Congress, First Session on H.R. 2511 and H.R. 2512, June 9 and 30, 1983

    International Nuclear Information System (INIS)

    Anon.

    1984-01-01

    Two bills (H.R. 2511 and H.R. 2512) amend licensing and siting regulations in the Atomic Energy Act by introducing the concept of one-stop licensing, encouraging standardized design and early site permits, and replacing adjudicatory proceedings with ''hybrid'' hearings. Witnesses speaking for and against the controversial proposals during the two-day hearing included Nunzio Palladino and other Commissioners of the Nuclear Regulatory Commission, Energy Secretary Hodel, and representatives of electric utilities, the nuclear industry, and environmental and public interest groups. Two appendices with additional material submitted for the hearing record follow the test of the two bills and the statements and testimony of 12 witnesses

  16. Use of social communication as a tool for environmental licensing of small-scale hydroelectric power plants; Uso da comunicacao social como instrumento para o licenciamento ambiental de PCH - pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Tiago Filho, Geraldo Lucio [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Inst. de Recursos Naturais], e-mail: tiago@unifei.edu.br; Galhardo, Camila Rocha [Centro Nacional de Referencia em Pequenas Centrais Hidreletricas (CERPCH), MG (Brazil)], e-mail: pchnoticias@unifei.edu.br

    2006-07-01

    The present work intends to study the process of environmental licensing of the Small ones Central Hydroelectric (PCHs) through the rising of the legal framework of the referred process and to analyze the application of tools of social communication in the mitigation of the social impacts in the zone of influence of the enterprise. Through the analysis of the critical points in the environmental licensing of small hydroelectric uses and evaluation of communication actions taking in consideration the environmental costs for the enterprise. (author)

  17. Licensing of away-from-reactor (AFR) installations

    International Nuclear Information System (INIS)

    Gray, P.L.

    1980-01-01

    Storage of spent fuel at Away-From-Reactor (AFR) installations will allow reactors to continue to operate until reprocessing or other fuel disposal means are available. AFR installations must be licensed by the Nuclear Regulatory Commission (NRC). Although wide experience in licensing reactors exists, the licensing of an AFR installation is a relatively new activity. Only one has been licensed to date. This paper delineates the requirements for licensing an AFR installation and projects a licensing schedule. Because the NRC is developing specific AFR requirements, this schedule is based primarily on draft NRC documents. The major documents needed for an AFR license application are similar to those for a reactor. They include: a Safety Analysis Report (SAR), and Environmental Report (ER), safeguards and security plans, decommissioning plans, proposed technical specifications, and others. However, the licensing effort has one major difference in that for AFR installations it will be a one-step effort, with follow-up, rather than the two-step process used for reactors. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  18. Final environmental statement related to operation of Indian Point Nuclear Generating Plant, Unit No. 3: (Docket No. 50-286): Volume 1

    International Nuclear Information System (INIS)

    1975-02-01

    The proposed action is the issuance of a license to consolidated Edison Company of New York, Inc., for the operation of the Indian Point Nuclear Generating Plant, Unit No. 3, located in the State of New York, Westchester County, Village of Buchanan, 24 miles north of the New York City boundary line. Although the present action is the issuance of an operating license for Unit No. 3, this Statement considers the environmental impacts from simultaneous operation of all three Units. A Final Environmental Statement has been issued for Unit No. 2. Furthermore, in view of the proximity to the Indian Point site of existing and presently proposed power plants on the Hudson River, the cumulative environmental benefits and impacts of the plants within a 30-mile reach of the river have been assessed. The proposed action is interreleated to other actions taken by other Federal agencies such as the Environmental Protection Agency, in regard to granting or denying application for discharge permits under the National Pollutant Discharge Elimination System (NPDES) instituted through the Federal Water Pollution Control Act Amendments of 1972, and the Federal Power Commission, in licensing of other facilities on the Hudson River. 128 figs., 210 tabs

  19. Operator licensing examination standards for power reactors. Interim revision 8

    International Nuclear Information System (INIS)

    1997-01-01

    These examination standards are intended to assist NRC examiners and facility licensees to better understand the processes associated with initial and requalification examinations. The standards also ensure the equitable and consistent administration of examinations for all applicants. These standards are for guidance purposes and are not a substitute for the operator licensing regulations (i.e., 10 CFR Part 55), and they are subject to revision or other changes in internal operator licensing policy. This interim revision permits facility licensees to prepare their initial operator licensing examinations on a voluntary basis pending an amendment to 10 CFR Part 55 that will require facility participation. The NRC intends to solicit comments on this revision during the rulemaking process and to issue a final Revision 8 in conjunction with the final rule

  20. ITER Safety and Licensing

    International Nuclear Information System (INIS)

    Girard, J-.P; Taylor, N.; Garin, P.; Uzan-Elbez, J.; GULDEN, W.; Rodriguez-Rodrigo, L.

    2006-01-01

    The site for the construction of ITER has been chosen in June 2005. The facility will be implemented in Europe, south of France close to Marseille. The generic safety scheme is now under revision to adapt the design to the host country regulation. Even though ITER will be an international organization, it will have to comply with the French requirements in the fields of public and occupational health and safety, nuclear safety, radiation protection, licensing, nuclear substances and environmental protection. The organization of the central team together with its partners organized in domestic agencies for the in-kind procurement of components is a key issue for the success of the experimentation. ITER is the first facility that will achieve sustained nuclear fusion. It is both important for the experimental one-of-a-kind device, ITER itself, and for the future of fusion power plants to well understand the key safety issues of this potential new source of energy production. The main safety concern is confinement of the tritium, activated dust in the vacuum vessel and activated corrosion products in the coolant of the plasma-facing components. This is achieved in the design through multiple confinement barriers to implement the defence in depth approach. It will be demonstrated in documents submitted to the French regulator that these barriers maintain their function in all postulated incident and accident conditions. The licensing process started by examination of the safety options. This step has been performed by Europe during the candidature phase in 2002. In parallel to the final design, and taking into account the local regulations, the Preliminary Safety Report (RPrS) will be drafted with support of the European partner and others in the framework of ITER Task Agreements. Together with the license application, the RPrS will be forwarded to the regulatory bodies, which will launch public hearings and a safety review. Both processes must succeed in order to

  1. Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication, Environmental Protection Agency Number ID4890008952

    Energy Technology Data Exchange (ETDEWEB)

    Holzemer, Michael J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hart, Edward [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-04-01

    Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication for the Idaho National Laboratory Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Partial Permit, PER-116. This Permit Reapplication is required by the PER-116 Permit Conditions I.G. and I.H., and must be submitted to the Idaho Department of Environmental Quality in accordance with IDAPA 58.01.05.012 [40 CFR §§ 270.10 and 270.13 through 270.29].

  2. Permitting issues in Virginia

    International Nuclear Information System (INIS)

    Kennel, R.P.

    1992-01-01

    As background, LG and E Development Corporation (formerly Hadson) has successfully put 16 Qualifying Facilities in the ground over the past 9 years in California, Maine, Virginia, and North Carolina. Each of these qualifying facilities has had some environmental innovative first, so there is no apology for the authors' environmental credentials. In Virginia, there are four identical 60 MW stoker coal cogeneration projects in Southampton County, Altavista, Hopewell, and -lastly-Buena Vista. The Buena Vista cogeneration project becomes the exception that proves the permitting rules. It has been in the permitting process for over 4 years; and despite being the cleanest coal project ever considered east of the Mississippi (design at 0.1 lbs/MMBtu for both So 2 and NO x ), it has suffered serous consequences from permitting delays and BACT ratcheting. As a simple comparison of importance, the Virginia Power Mt. Storm coal power facility emits approximately 150,000 tons of So 2 per year, while the Buena Vista project will actually emit approximately 150 tons of SO 2 per year (not including 1,500' tons of purchased SO 2 offsets). Both are similar distances from the Shenandoah National Park which has been the primary environmental point of concern in Virginia

  3. Applicability of IBAMA normative instruction 146-2007 to pipeline environmental licensing

    Energy Technology Data Exchange (ETDEWEB)

    Basbaum, Marcos A.; Fonseca, Renata A.A. [Servicos de Engenharia Emilio Baumgart Ltda. (SEEBLA), Rio de Janeiro, RJ(Brazil)], e-mail: mbasbaum.seebla@petrobras.com.br, e-mail: renataamorim.seebla@petrobras.com.br; Torggler, Bianca F.; Fernandes, Renato; Guimaraes, Ricardo Z.P. [Petroleo do Brasil S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)], e-mail: torggler@petrobras.com.br, e-mail: renatofer@petrobras.com.br, e-mail: rzaluar@petrobras.com.br

    2009-07-01

    PETROBRAS has been conducting several wildlife programs in response to environmental licensing requirements from IBAMA (Brazilian environmental agency). Since 2007, IBAMA has been requiring the application of the Normative Instruction n. 146 (NI), which establishes criteria for wildlife management in the influence areas of new enterprises. However, experience from PETROBRAS has shown that many of the NI articles are not applicable to pipelines. Thus, a critical analysis of this NI was done based on data from company's wildlife programs. Our analysis indicated that the main NI items that do not apply to pipelines are: 1 - Animal rescue programs in deforested areas and selection of release areas, 2 - More than two fauna monitoring campaigns a year, 3 - Monitoring programs involving all groups of terrestrial vertebrates and also invertebrate classes. The non-applicability of these items is due to: 1 - The majority of pipelines are built in areas without significant native vegetation or with small fragments only, which are usually in secondary stage of ecological succession. Most pipelines scarcely involve removal of primary vegetation, 2 - Pipelines have an influence area restricted to a range of 800 m and the construction directly affects only strips from 20 m to 30 m, 3 - The most relevant impacts associated with pipelines are temporary, and do not persist during their operation. (author)

  4. Establishment of regulatory framework for the development reactor licensing

    International Nuclear Information System (INIS)

    Jo, Jong C.; Yune, Young G.; Kim, Woong S.; Ahn, Sang K.; Kim, In G.; Kim, Hho J.

    2003-01-01

    With a trend that various types of advanced reactor designs are currently under development worldwide, the Korea Atomic Energy Research Institute has been developing an advanced reactor called ' System-integrated Modular Advanced Reactor (SMART)', which is a small sized integral type pressurized water reactor with a rated thermal power of 330 MW. To demonstrate the safety and the performance of the SMART reactor design, the SMART Research and Development Center has embarked to build a scaled-down pilot plant of SMART, called 'SMART-P' with a rated thermal power of 65 MW. In preparation for the forthcoming applications for both construction permit and operating license of SMART-P in the near future, the Korea Institute of Nuclear Safety is developing a new regulatory framework for licensing review of such a development reactor, which covers establishment of licensing process, identification and resolution of technical and safety issues, development of regulatory evaluation or verification-purpose computer codes and analytical methods, and establishment of design-specific, general design and operating criteria, regulations, and associated regulatory guides. This paper presents the current activities for establishing a regulatory framework for the licensing of a research and development reactor. Discussions are made on the SMART-P development program, the current Korean regulatory framework for reactor licensing, the SMART-P licensing-related issues, and the approach and strategy for developing an effective regulatory framework for the SMART-P licensing

  5. The strategy of experimental power reactor licensing in Indonesia

    International Nuclear Information System (INIS)

    Moch Djoko Birmano

    2015-01-01

    Currently, BATAN has being planned to develop Experimental Power Reactor (EPR), that is the research nuclear reactor that can generate power (electricity or heat). The EPR is planned will be built in the National Center for Research of Science and Technology (Puspiptek) area at Serpong, South Tangerang, Banten Province, with the choice of reactor types is HTGR with the power size of 10 MWth. As stated in the Act No. 10 year 1997 on Nuclear Power, that every construction and operation of nuclear reactors and other nuclear installations and decommissioning of nuclear reactors required to have a permit. Furthermore, the its implementation arrangements is regulated in Government Regulation (GR) No. 2 year 2014 on Licensing of Nuclear Installations and Nuclear Material Utilization, which contains the requirements and procedures for the licensing process since site, construction, commissioning, operation, and decommissioning, it means licensing is implemented during the activity of construction, operation and decommissioning of NPPs.While, for the more detailed licensing arrangements available in the guidelines of BAPETEN Chairman Regulation (BCR). This study was conducted to understand the legal and institutional aspects, types and stages, and the licensing process of RDE, and identify licensing strategy so that timely as planned. Methodologies used include the literature study, consultation with experts in BAPETEN, discussions in the national seminar including FGD. (author)

  6. 75 FR 49539 - Notice of Availability of the Draft Environmental Impact Statement for the Combined Licenses for...

    Science.gov (United States)

    2010-08-13

    ... contacting Mr. Douglas Bruner by telephone at 1-800-368- 5642, extension 2730, or via e-mail to Levy.COLEIS... may also have an opportunity to speak, if time permits. Mr. Bruner will need to be contacted no later.... FOR FURTHER INFORMATION CONTACT: Mr. Douglas Bruner, Environmental Projects Branch 3, U.S. Nuclear...

  7. RCRA Part B permit modifications for cost savings and increased flexibility at the Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    Jierree, C.; Ticknor, K.

    1996-10-01

    With shrinking budgets and downsizing, a need for streamlined compliance initiatives became evident at the Rocky Flats Environmental Technology Site (RFETS). Therefore, Rocky Mountain Remediation Services (RMRS) at the RFETS successfully and quickly modified the RFETS RCRA Part B Permit to obtain significant cost savings and increased flexibility. This 'was accomplished by requesting operations personnel to suggest changes to the Part B Permit which did not diminish overall compliance and which would be most. cost beneficial. The U.S. Department of Energy (DOE) subsequently obtained approval of those changes from the Colorado Department of Public Health and the Environment (CDPHE)

  8. 78 FR 6817 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-01-31

    ... Wisconsin Public Service Corporation--JP Pulliam Plant. Pursuant to section 505(b)(2) of the Act, a... ENVIRONMENTAL PROTECTION AGENCY [FRL 9774-6] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Wisconsin Public Service Corporation--JP Pulliam Plant AGENCY...

  9. 77 FR 51551 - Proposed Renewal of Information Collection: Alternatives Process in Hydropower Licensing

    Science.gov (United States)

    2012-08-24

    ...: Alternatives Process in Hydropower Licensing AGENCY: Office of the Secretary, Office of Environmental Policy... approval for the collection of information for Alternatives Process in Hydropower Licensing. This... comments should reference Alternatives Process in Hydropower Licensing. FOR FURTHER INFORMATION CONTACT: To...

  10. Licensing of nuclear power plants. The case of Sweden in an international comparison

    International Nuclear Information System (INIS)

    Michanek, Gabriel; Soederholm, Patrik

    2009-01-01

    Efficient power plant licensing procedures are essential for the functioning of deregulated electricity markets. The purpose of this paper is to review and analyse the licensing process for nuclear power plants in Sweden, and in part contrast the Swedish case with the corresponding approaches in a selection of other countries. This approach permits a discussion of how licensing processes can be altered and what the benefits and drawbacks of such changes are. The paper highlights and discusses a number of important legal issues and implications, including, for instance: (a) the role of political versus impartial decision-making bodies; (b) the tension between national policy goals and implementation at the local level; (c) public participation and access to justice; (d) consistency and clarity of the legal system; and (e) the introduction of license time limits. (author)

  11. Licensing and supervision of nuclear facilities in Finland; Genehmigung und Aufsicht von nuklearen Anlagen in Finnland

    Energy Technology Data Exchange (ETDEWEB)

    Laaksonen, J. [STUK - Radiation and Nuclear Safety Authority, Helsinki (Finland)

    2006-01-01

    In Finland, the licensing process of all nuclear facilities is specified in the Nuclear Energy Act. The licensing procedure comprises three steps, each of which requires a decision by the government: basic decision, construction permit, and operating license. All licensing decisions are taken upon application to the Ministry of Trade and Industry. The Ministry invites comments and opinions on a broad basis and drafts a statement for the government. The basic decision by the government is political, pre-supposing a positive statement by the Central Office for Nuclear Safety (STUK) and a positive decision by the local government of the planned plant location. The construction permit and the operating license are mainly based on points of nuclear safety. STUK is the independent nuclear supervisory agency with administrative powers; its staff has the technical and scientific competence required for safety assessments and for supervision. STUK operates under the supervision of the Ministry for Social Affairs and Health which, to demonstrate its independence, has no duties in the energy sector and, in addition, supervises STUK in administrative matters, not in scientific and technical decisions. Internal rules of STUK ensure neutrality also of its staff in matters of energy policy. The activities of STUK as a supervisory and licensing authority in Finland are described in detail for the management of spent nuclear fuel and the new Olkiluoto 3 nuclear power plant currently under construction. (orig.)

  12. 23 CFR 650.807 - Bridges requiring a USCG permit.

    Science.gov (United States)

    2010-04-01

    ... engineering, social, economic and environmental benefit and impacts. (e) The HA shall consider hydraulic... permit. (a) The USCG has the responsibility (1) to determine whether a USCG permit is required for the... the USCG to be involved throughout the environmental review process in accordance with 23 CFR part 771...

  13. 77 FR 30308 - Proposed Renewal of Information Collection: Alternatives Process in Hydropower Licensing

    Science.gov (United States)

    2012-05-22

    ...: Alternatives Process in Hydropower Licensing AGENCY: Office of the Secretary, Office of Environmental Policy... the Alternatives Process in Hydropower Licensing, OMB Control Number 1094-0001. FOR FURTHER... more of the Departments develop for inclusion in a hydropower license issued by the Federal Energy...

  14. Streamlining or sidestepping? Political pressure to revise environmental licensing and EIA in Brazil

    International Nuclear Information System (INIS)

    Bragagnolo, Chiara; Carvalho Lemos, Clara; Ladle, Richard J.; Pellin, Angela

    2017-01-01

    In the Anthropocene, governments are increasingly being forced to take action to minimize or reverse human impacts on the environment. One of the most widespread legal instruments to prevent negative impacts on the environment is Environmental Impact Assessment (EIA). Almost all countries have an EIA system in place aimed at mitigating the diverse impacts causing by development projects. A common drawback of such systems is that they are often ineffective and time-consuming, and are therefore frequently viewed by politicians as “in the way” of development. This is the case in Brazil, where EIA has had a very limited influence on decision-making and where environment reforms (e.g. the new Forest Code) have often been strongly influenced by powerful lobbies (e.g. agribusiness groups, industry actors, etc.) and conservative legislators. Continuing this trend, the most recent political developments have seen the proposal of a series of amendments aimed at “streamlining” the Brazilian EIA system. In this viewpoint, we provide an in depth analysis of the proposed changes, highlighting the serious consequences that would accompany the weakening of environmental licensing and EIA legislation in Brazil.

  15. Aseismic Design Licensings and guidelines for nuclear power plant in Japan

    Energy Technology Data Exchange (ETDEWEB)

    Yoshizawa, Kazumi [Agency of Natural Resources and Energy, Tokyo (Japan)

    1997-03-01

    This paper describes Aseismic Design Licensing for Japanese Nuclear Power Plants which includes system, procedures and brief contents concerned application, permit and inspection, and the `Examination Guide for Aseismic Design of the Nuclear Power Reactor Facilities` which focused principals of seismic design loads, load combinations, and allowable limits. (J.P.N.)

  16. Aseismic Design Licensings and guidelines for nuclear power plant in Japan

    International Nuclear Information System (INIS)

    Yoshizawa, Kazumi

    1997-01-01

    This paper describes Aseismic Design Licensing for Japanese Nuclear Power Plants which includes system, procedures and brief contents concerned application, permit and inspection, and the 'Examination Guide for Aseismic Design of the Nuclear Power Reactor Facilities' which focused principals of seismic design loads, load combinations, and allowable limits. (J.P.N.)

  17. Licensing new nuclear energy plants in the 90s

    International Nuclear Information System (INIS)

    Miller, J.H. III; Bishop, R.W.

    1992-01-01

    This paper reports that the framework for nuclear regulation in the United States was established by Congress in the Atomic Energy Act of 1954 (AEA). Under the AEA, the nuclear power program in the United States was launched with a technology just being developed and a nuclear power industry in its infancy. The regulations fashioned by the Atomic Energy Commission under the AEA took into account the evolving state of the technology and the emerging industry in those formative years. The process required a utility desiring to build and operate a nuclear power plant to obtain two separate licenses: one authorizing construction and one authorizing operation. At the construction permit stage, generally only preliminary design information was available and a construction permit could be issued with as little as ten to fifteen percent of the facility design completed. Thereafter, design completion, along with research and development required to address open technical issues, progressed in tandem with construction in what is fairly characterized as a design-as-you-go process. Only as plant construction approached completion was the adequacy of the final design evaluated in connection with the operating license review process

  18. Deep repository and encapsulation plant for spent nuclear fuel. Consultation and environmental impact assessment according to the Environmental Code and the Nuclear Activities Act

    International Nuclear Information System (INIS)

    2002-11-01

    As a part of its programme for siting of a deep repository for spent nuclear fuel, SKB has recently commenced site investigations at Forsmark in Oesthammar Municipality and at Simpevarp in Oskarshamn Municipality. At the same time, SKB has initiated the consultation process prior to application for permits/licences under the Environmental Code and the Nuclear Activities Act. Early consultation has been carried out for both sites, and a consultation report has been submitted to the county administrative boards in Kalmar County and Uppsala County for decisions regarding significant environmental impact. After decisions by the county administrative boards, SKB will commence the work with environmental impact assessment and extended consultation. SKB's main alternative for the encapsulation plant is siting adjacent to CLAB. In the spring of 2003, SKB will convene early consultation on the encapsulation plant. This will be followed by extended consultation up to 2005. This process will be coordinated with the extended consultation for a deep repository in Oskarshamn. An alternative is to locate the encapsulation plant at a deep repository at Forsmark. This alternative is being dealt with completely within the extended consultation for the deep repository at Forsmark. Three different permits/licences are required for both the encapsulation plant and the deep repository: a permit under the Environmental Code, a licence under the Nuclear Activities Act, and a building permit under the Planning and Building Act. Licensing under the Environmental Code and the Nuclear Activities Act takes place in parallel. The applications under both laws must include an environmental impact statement (EIS) prepared according to the rules in Chapter 6 of the Environmental Code. The same EIS is thus used in both applications. Separate EISs are prepared for the encapsulation plant and the deep repository. According to the Environmental Code, the consultation shall relate to the location, scope

  19. Consolidated permit regulations and hazardous waste management system: Environmental Protection Agency. Notice of issuance of regulation interpretation memorandum.

    Science.gov (United States)

    1981-12-10

    The Environmental Protection Agency (EPA) is issuing today a Regulation Interpretation Memorandum (RIM) which provides official interpretation of the issue of whether a generator who accumulates hazardous waste pursuant to 40 CFR 262.34, may qualify for interim status after November 19, 1980. This issue arose when the requirements for submitting a Part A permit application (one of the prerequisites to qualifying for interim status) were amended on November 19, 1980. The provisions interpreted today are part of the Consolidated Permit Regulations promulgated under Subtitle C of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, as amended (RCRA).

  20. Eco-Technology Licensing under Emission Tax: Royalty vs. Fixed-Fee

    OpenAIRE

    Seung-Leul Kim; Sang-Ho Lee

    2014-01-01

    This article considers the licensing strategies of eco-technology when an innovator provides pollution abatement goods to oligopolistic polluting firms that produce consumption goods and emit environmental pollutants. In the presence of emission tax, two types of licensing contracts, royalty and fixed-fee, are examined to analyze market equilibrium and to compare their welfare consequences. We show that an eco-innovator provides a non-exclusive license under a royalty contract while it might ...

  1. Early Site Permit Demonstration Program: Plant parameters envelope report. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    The Early Site Permit (ESP) Demonstration Program is the nuclear industry`s initiative for piloting the early resolution of siting-related issues before the detailed design proceedings of the combined operating license review. The ESP Demonstration Program consists of three phases. The plant parameters envelopes task is part of Phase 1, which addresses the generic review of applicable federal regulations and develops criteria for safety and environmental assessment of potential sites. The plant parameters envelopes identify parameters that characterize the interface between an ALWR design and a potential site, and quantify the interface through values selected from the Utility Requirements Documents, vendor design information, or engineering assessments. When augmented with site-specific information, the plant parameters envelopes provide sufficient information to allow ESPs to be granted based on individual ALWR design information or enveloping design information for the evolutionary, passive, or generic ALWR plants. This document is expected to become a living document when used by future applicants.

  2. Waste-to-energy permitting sourcebook

    International Nuclear Information System (INIS)

    Longwell, D.; Wegrecki, A.; Williams, D.

    1992-10-01

    Environmental issues, regulatory processes and approvals important in obtaining a permit to construct and/or operate a waste-to-energy (WTE) facility are identified and discussed. Environmental issues include: (1) air emission levels, their control and potential impacts, (2) ash leachability, treatment, and disposal, (3) potential health risks from emissions, and (4) other issues such as need/benefit and public perception of WTE. Laws, regulations and approvals that can affect project development are identified and listed, and potential regulatory trends are discussed. A general permit acquisition plan is also presented. An analysis of environmental and regulatory data obtained from the literature, regulatory agencies, and specific projects is presented. California and Massachusetts, both with regulations generally more stringent than federal regulations and considered environmentally conservative, were selected for detailed state regulatory review. Two project case histories (Commerce Refuse-to-Energy (RTE) Project in California and SEMASS WTE Project in Massachusetts) were selected to illustrate: (1) how regulations are actually applied to a project, (2) project-specific permit and operating conditions, and (3) project-specific environmental issues. Modern WTE plots employ state-of-the-art air emission control technologies and strategies to reduce air emission is to levels below regulatory requirements and to reduce estimated health risks to within EPA's acceptable risk range. WTE ash leachate can exhibit hazardous waste characteristics, primarily lead and cadmium. However, modern landfills utilize liners and leachate collection systems to prevent infiltration of leachate into the groundwater supply. Modern WTE plants employ dry systems and have zero process wastewater discharge

  3. 75 FR 22400 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator...

    Science.gov (United States)

    2010-04-28

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9142-6] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator Baltimore, L.P., Baltimore City, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean...

  4. A review of tritium licensing requirements

    International Nuclear Information System (INIS)

    Meikle, A.B.

    1982-12-01

    Present Canadian regulations and anticipated changes to these regulations relevant to the utilization of tritium in fusion facilities and in commercial applications have been reviewed. It is concluded that there are no serious licensing obstacles, but there are a number of requirements which must be met. A license will be required from Atomic Energy Control Board if Ontario Hydro tritium is to be applied by other users. A license is required from the Federal Government to export or import tritium. A licensed container will be required for the storage and shipping of tritium. The containers being designed by AECL and Ontario Hydro and which are currently being tested will adequately store and ship all of the Ontario Hydro tritium but are unnecessarily large for the small quantities required by the commercial tritium users. Also, some users may prefer to receive tritium in gaseous form. An additional, smaller container should be considered. The licensing of overseas fusion facilities for the use of tritium is seen as a major undertaking offering opportunities to Canadian Fusion Fuels Technology Project to undertake health, safety and environmental analysis on behalf of these facilities

  5. Environmental impact appraisal for renewal of source material license No. SUB-526 (Docket No. 40-3392)

    International Nuclear Information System (INIS)

    1984-05-01

    Allied Chemical Company operates a privately owned UF 6 production facility at Metropolis, Illinois, At this facility, uranium ore concentrates are converted into uranium hexafluoride (UF 6 ). The UF 6 product from this facility is shipped to Department of Energy (DOE) gaseous diffusion plants for enrichment of the 235 U isotope. This assessment: (1) reviews the operation of the facility during the recent license period by comparing the plant effluent releases or environmental monitoring data with permissible levels of contaminants; and (2) determines the impact on the environment from continued operation of the facility in its current configuration. 10 figures, 44 tables

  6. Environmental law in Brazil: analysis of environmental licensing of wind power plants in permanently preserved areas; Direito ambiental no Brasil: analise do licenciamento ambiental de usinas eolicas de preservacao permante

    Energy Technology Data Exchange (ETDEWEB)

    Amaral, Cristiano Abijaode; Pedreira, Adriana Coli; Bleil, Julia Rechia [Associacao Brasileira dos Investidores em Autoproducao de Energia (ABIAPE), Brasilia, DF (Brazil)], E-mails: cristiano@abiape.com.br, adriana@abiape.com.br, julia@abiape.com.br

    2011-04-15

    The Brazilian electric energy matrix is mostly renewable. According to the Generation Information Base (BIG) of the Brazilian Electricity Regulatory Agency (ANEEL), hydroelectricity is responsible for 67.31% of the country's energy. The additional generation comes mostly from fossil fuels, whose use is questioned when it comes to environmental quality and climate change. Despite its abundance, hydroelectric power generation has physical, socioeconomic and environmental limitations. Thus, it is essential to develop alternative technologies, providing security in the supply of electric energy and the maintenance of a clean matrix. Among the alternative technologies available, wind power is the one that has been gaining prominence, domestically and internationally speaking. In the last auction of renewable sources held in August 2010 in Brazil, the energy produced by the plants of sugarcane bagasse (biomass) was traded at an average of R$ 144.20 MWh; wind energy, which was the cheapest, was traded at R$ 130.86, and the energy from small hydropower plants (PCH), at R$ 141.93 MWh. The wind power plants accounted for 70% of the auction, which resulted in a plan for increasing its installed capacity by fivefold, by the year 2013. Brazil has great potential to be explored (estimated 143,000 MW), yet despite being appealing, wind energy still face some challenges. One of them is due to the fact that most potential areas for such energy are found in permanently preservation areas and areas considered national assets, subject to special protection measures. This study aims to investigate whether the regulatory, legal and environmental issues are considered an obstacle to an effective inclusion of wind power generation in Brazil. The study examines the process of environmental licensing of wind power plants, especially those established in permanently preservation areas (APPs) and Coastal Areas. The research methodology consisted of normative framework, judicial decisions

  7. 76 FR 53452 - Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit...

    Science.gov (United States)

    2011-08-26

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9457-3 ] Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit for Reliant Portland Generating Station, Upper Mount Bethel Township, Northampton County, PA AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of action...

  8. Decommissioning in the oil and gas industry and the inclusion of decommissioning permit in the Brazilian system of environmental permitting - first thoughts; O descomissionamento na industria de petroleo e gas e a inclusao da licenca de desinstalacao no procedimento de licenciamento ambiental brasileiro - primeiras reflexoes

    Energy Technology Data Exchange (ETDEWEB)

    Bezerra, Luiz Gustavo Escorcio [Stroeter e Royster Advogados, Sao Paulo, SP (Brazil)]|[Universidade do Estado do Rio de Janeiro (UERJ), RJ (Brazil). Faculdade de Direito. Programa de Estudos e Pesquisa em Direito do Petroleo (ANP - PRH33)

    2005-07-01

    This paper aims to promote discussions regarding the decommissioning issue, its role in the protection of the environment and the feasibility of the inclusion of a Decommissioning Permit in the Brazilian System of Environmental Permitting. (author)

  9. 77 FR 24200 - Clean Air Act Operating Permit Program; Petitions for Objection to State Operating Permits for...

    Science.gov (United States)

    2012-04-23

    ... Objection to State Operating Permits for Consolidated Environmental Management, Inc.--Nucor Steel Louisiana... Management, Inc.--Nucor Steel Louisiana (``Nucor'') in Saint James Parish, Louisiana. Pursuant to sections... Environmental Management, Inc.--Nucor Steel Louisiana (``Nucor'') is available electronically at: http://www.epa...

  10. The need for review of environmental licensing rules taking into accounts innovations in the area of onshore seismic data acquisition; A necessidade de revisao das regras de licenciamento ambiental considerando inovacoes na area de aquisicao de dados sismicos terrestres

    Energy Technology Data Exchange (ETDEWEB)

    Vieira, Victor M. [Faculdade de Tecnologia e Ciencias - FTC, Salvador, BA (Brazil); Stilgoe, George [GeoDynamics Brasil Ltda., Rio de Janeiro, RJ (Brazil); Ferreira, Doneivan F. [Universidade Federal da Bahia (UFBA), Salvador, BA (Brazil). Dept. de Geologia e Geofisica Aplicada

    2008-07-01

    Activities involving seismic data acquisition aimed at the exploration, characterization, and monitoring of onshore oil and gas fields are expected to cause environmental impacts. Therefore, all seismic-related activities which require the use of traditional technologies must be licensed beforehand. The environmental licensing process is complex and subjected to interruptions and delays which will affect project schedule and cash flow. Some innovations in this field and other alternative techniques will allow data acquisition with reduced or insignificant environmental impacts. Within this context, the present paper proposes a description of the current onshore seismic acquisition techniques commonly used and their potential environmental impacts; presents and describes the innovative technique known as Infrasonic Passive Differential Spectroscopy (IPDS); and proposes a regulatory model which will allow a simplified licensing process. Additionally, this paper considers some positive impacts of regulatory flexibility, including: the possibility of using innovative techniques to fulfill obligations under the ANP Initial Work Program (PTI); time and cost reduction within the environmental licensing process; potential impacts on the recently-created market of oil production in fields with marginal accumulations. (author)

  11. Licensing the California low-level radioactive waste disposal facility

    International Nuclear Information System (INIS)

    Dressen, A.L.; Serie, P.J.; Junkert, R.

    1992-01-01

    California has made significant progress toward the issuance of a license to construct and operate the Southwestern Compact's low-level radioactive waste disposal facility. However, obstacles to completing construction and preparing to receive waste still exist. This paper will describe the technical licensing issues, EIR/S process, political events, and public interactions that have impacted on California regulators' ability to complete the license application review and reach a decision on issuing a license. Issues associated with safely and liability evaluations, finalization of the environmental impact report, and land transfer processes involving multiple state, federal, and local agencies will be identified. Major issues upon which public and political opposition is focusing will also be described. (author)

  12. The Use of Transferable Permits in Transport Policy

    OpenAIRE

    Raux, Charles

    2004-01-01

    http://dx.doi.org/10.1016/j.trd.2004.01.001; International audience; This paper considers potential use of domestic transferable, or tradable, permit systems for the purposes of travel management, especially reducing environmental nuisances. The main arguments for and against the use of permits are analyzed. Secondly two case studies of existing permit systems are examined. The main conclusions are that tradable permits can address greenhouse gas and regional atmospheric pollutant emissions, ...

  13. Storm water permitting for oil and gas facilities

    International Nuclear Information System (INIS)

    de Blanc, P.C.

    1991-01-01

    After several false starts, the US Environmental Protection Agency (EPA) published new federal storm water regulations in the November 16, 1990 Federal Register. These regulations identify facilities which must apply for a storm water permit and detail permit application requirements. The regulations appear at 40 CFR 122 Subpart B and became effective December 17, 1990. An outline of these regulations and their applicability to oil and gas facilities is presented. They are: facilities which require a storm water permit; types of storm water permits; permit application deadlines; permit application forms; facilities with existing storm water permits; storm water permit application data requirements; storm water sampling and analysis requirements; and EPA contacts for additional information

  14. CEQ regulations called peril to nuclear licensing process

    International Nuclear Information System (INIS)

    O'Neill, J.V.

    1979-01-01

    Court challenges are expected over regulations of the Council on Environmental Quality (CEQ) that were designed to improve nuclear-licensing decisions, but that have actually changed the meanings of National Environmental Policy Act (NEPA) regulations. The legal implications of these changes could, unless resolved, make the licensing process for nuclear facilities even more uncertain. Agency comments are thought to be critical, although the CEQ has declined to release them, and some question the Council's legality. The Nuclear Regulatory Commission faults the CEQ regulations for revising existing law, being inconsistent with the responsibilities of an independent regulatory body, and extending the CEQ's authority beyond the role assigned by NEPA and the President's Executive Order

  15. 40 CFR 68.85 - Hot work permit.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  16. 40 CFR 96.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.323 Section 96.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... the permitting authority, as necessary to facilitate coordination of the renewal of the CAIR permit...

  17. 14 CFR 433.7 - Environmental.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Environmental. 433.7 Section 433.7... TRANSPORTATION LICENSING LICENSE TO OPERATE A REENTRY SITE § 433.7 Environmental. An applicant shall provide the FAA with information for the FAA to analyze the environmental impacts associated with proposed...

  18. 75 FR 3731 - Proposed Issuance of a General NPDES Permit for Small Suction Dredging-Permit Number IDG-37-0000

    Science.gov (United States)

    2010-01-22

    ... System (NPDES) general permit to placer mining operations in Idaho for small suction dredges (intake... ENVIRONMENTAL PROTECTION AGENCY [FRL-9104-3] Proposed Issuance of a General NPDES Permit for Small... significant economic impact on a substantial number of small entities.'' EPA has concluded that NPDES general...

  19. Watershed-based point sources permitting strategy and dynamic permit-trading analysis.

    Science.gov (United States)

    Ning, Shu-Kuang; Chang, Ni-Bin

    2007-09-01

    Permit-trading policy in a total maximum daily load (TMDL) program may provide an additional avenue to produce environmental benefit, which closely approximates what would be achieved through a command and control approach, with relatively lower costs. One of the important considerations that might affect the effective trading mechanism is to determine the dynamic transaction prices and trading ratios in response to seasonal changes of assimilative capacity in the river. Advanced studies associated with multi-temporal spatially varied trading ratios among point sources to manage water pollution hold considerable potential for industries and policy makers alike. This paper aims to present an integrated simulation and optimization analysis for generating spatially varied trading ratios and evaluating seasonal transaction prices accordingly. It is designed to configure a permit-trading structure basin-wide and provide decision makers with a wealth of cost-effective, technology-oriented, risk-informed, and community-based management strategies. The case study, seamlessly integrating a QUAL2E simulation model with an optimal waste load allocation (WLA) scheme in a designated TMDL study area, helps understand the complexity of varying environmental resources values over space and time. The pollutants of concern in this region, which are eligible for trading, mainly include both biochemical oxygen demand (BOD) and ammonia-nitrogen (NH3-N). The problem solution, as a consequence, suggests an array of waste load reduction targets in a well-defined WLA scheme and exhibits a dynamic permit-trading framework among different sub-watersheds in the study area. Research findings gained in this paper may extend to any transferable dynamic-discharge permit (TDDP) program worldwide.

  20. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Science.gov (United States)

    2010-01-01

    ... Commission has previously prepared an environmental impact statement for the construction and operation of a... the limited work authorization, new and significant information on the environmental impacts of those... Utilization Facilities § 51.105 Public hearings in proceedings for issuance of construction permits or early...

  1. 75 FR 75463 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper...

    Science.gov (United States)

    2010-12-03

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9234-9] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper Company, Luke, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean Air Act (CAA), the...

  2. Public debates - key issue in the environmental licensing process for the completion of the Cernavoda NPP Unit 2

    International Nuclear Information System (INIS)

    Rotaru, Ioan; Jelev, Adrian

    2003-01-01

    SN 'NUCLEARELECTRICA' S.A., the owner of Cernavoda NPP, organized, in 2001, several public consultations related to environmental impact of the completion of the Cernavoda NPP Unit 2, as required by the Romanian environmental law, part of project approval. Public consultations on the environmental assessment for the completion of the Cernavoda NPP - Unit 2 took place in 2001 between August 15 and September 21 in accordance with the provisions of Law No. 137/95 and Order No. 125/96. Romanian environmental legislation, harmonization of national environmental legislation with European Union, Romanian legislative requirements, information distributed to the public, issues raised and follow-up, they all are topics highlighted by this paper and they are addressing the environmental licensing process of the Cernavoda 2 NPP. The public consultation process described fulfils all the Romanian requirements for carrying out meaningful consultation with its relevant shareholders. The process also satisfies EDC (Export Development Corporation - Canada) requirements for public consultation and disclosure with relevant shareholders in the host country. SNN is fully committed to consulting as necessary with relevant shareholders throughout the construction and operation of the Project. Concerns of the public have been taken into account with the operations of Unit 1 and will continue to be addressed during the Unit 2 Project

  3. Contribution of studies for environmental licensing to the knowledge of Santa Catarina avifauna in southern Brazil

    Directory of Open Access Journals (Sweden)

    Marcos Antônio Guimarães Azevedo

    2006-03-01

    Full Text Available The knowledge generated by studies for environmental licensing, even with reduced field samplings, can contribute to the recording of species of avifauna or actually extends the distribution in places of low knowledge. This study presents data obtained from preliminary reports of impact where the avifauna in seven projects in different ecosystems of Santa Catarina state was diagnosed between January 2001 and January 2004. Sightings had occurred, mainly, by visual or auditory contacts, using binoculars, hand-recorders and field guides. A total of 232 species of birds had been registered, increasing the known distribution by 66 species in different regions of Santa Catarina. The habitat most damaged by entrepreneurial activity was the forest, a factor of concern regarding the conservation of the avifauna that relied upon it. In general, the risk factors associated with the avifauna in Santa Catarina state are environmental degradation, capture of wildlife for breeding in captivity and, hunting for food.

  4. Permitting plan for project W-236B, initial pretreatment module

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    The Tank Waste Remediation System pretreatment process mission is to separate high-level and low-level waste fractions. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before construction and operation of the facility. This revised document provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the probability of success for each alternative for the Initial Pretreatment Module resulting from recent revisions to the Tri-Party Agreement

  5. ONR Licensing and Regulation of a Geological Disposal Facility in the UK

    International Nuclear Information System (INIS)

    Boydon, Frans; Glazbrook, David

    2014-01-01

    Document available in abstract form only. Full text follows: The UK has substantial quantities of waste which has arisen from operation and decommissioning of legacy nuclear plant. While a disposal route for Low Level Waste (LLW) has been in operation in the UK for many years, there is as yet no such route for Higher Activity Waste. The government invited local communities to express an interest in hosting a Geological Disposal Facility (GDF). However, the Scottish government is opposed to deep disposal and proposes long-term interim storage in Scotland. This paper describes the work underway and current progress in developing a GDF for the UK. In particular it describes the current legal system in the UK that enables nuclear facilities to be licensed and the background underpinning licensing of existing disposal facilities. It identifies changes which will be necessary to legislation to enable a GDF to be licensed and work which it is performing in close co-operation with the Environment Agency which operate a permitting regime for environmental aspects. The Office of Nuclear Regulation (ONR) regulates safety, security and transport associated with nuclear sites. This paper focuses on the regulation of safety and radioactive waste. The UK licensing regime is non-prescriptive and proportionate, allowing for a flexible approach to licensing. The licence is not time-limited but is designed to be used from construction, through commissioning for the lifetime of the facility. Under the Nuclear Installations Act 1965 (as amended) ONR may attach licence conditions: - In the interests of safety; or - with respect to the handling, treatment and disposal of nuclear matter. ONR has developed a suite of 36 Licence conditions, which typically require the operator to made 'adequate arrangements' to ensure safety. These arrangements would involve the use of 'hold points' beyond which the operator must not proceed without ONR's agreement. In determining

  6. Geoprocessing semiautomated applied to licensing of nuclear facilities

    International Nuclear Information System (INIS)

    Oliveira, Aline Fabiane Gonçalves de

    2017-01-01

    In recent decades, Brazilian environmental legislation has undergone considerable evolution. This fact occurs concurrently with changes related to environmental studies, which aim increasingly to guarantee sustainability and environmental balance. Thus, it is important to use technological resources to optimize the environmental studies involved in the licensing processes. The present work sought to analyze and direct the application of geotechnologies (Geoprocessing) in environmental studies of the Local Report (RL) of the Center for the Development of Nuclear Technology (CDTN). The proposal to apply the Geoprocessing tools and the possibilities inherent to the Geographic Information Systems (GIS) technology, as a tool to subsidize the environmental studies in accordance with the requirements of the RL was aimed at contributing to the modernization of the stages involved in the process of Nuclear licensing, such as in the structuring and execution of environmental studies, as well as in the activities of environmental monitoring, always considering the precepts in force in the laws and resolutions and standards in force of the National Nuclear Energy Commission (CNEN) for nuclear licensing. In order to achieve the objective, the ArcGis application was adopted and one of its analytical tools Model Builder. This allowed the macro (schematization) of the methodology from the GIS tools applied, presenting as an advantage the efficiency and optimization of the execution time of the procedures in situations where it is necessary to apply the same routine of tasks, besides being editable, Which provides possibilities for adaptations and improvements. In order to achieve this objective, the applicability of the methodology was highly feasible, the model developed by Model Builder / ArcMap, provided a semi-automated process, and provided a flowchart that depicts the procedure to be performed in order to reach the Final process to make inferences and analyzes with greater

  7. Banking and back-loading emission permits

    International Nuclear Information System (INIS)

    Chaton, Corinne; Creti, Anna; Peluchon, Benoît

    2015-01-01

    In this article we focus on the so-called back-loading policy adopted by the European Commission to increase the carbon market price. This environmental measure consists of removing a share of the allowances allocated for a given period in order to reallocate some or all of them later on. To analyze the impact of the permits back-loading, we determine the CO 2 price equilibrium with and without the policy measure, considering not only the market for permits but also the output market of regulated sectors. We propose a two-period model, where the market for permits is perfectly competitive, and the output market can be either competitive or oligopolistic. First, we define the condition under which banking from one period to another is optimal. This condition, that is the absence of arbitrage opportunities (AOA), depends not only from the period initial allocation but also on production market fundamentals. When this condition is satisfied, the market for emission is shown intertemporally efficient. Second, we point out that the back-loading measure may create inefficiencies or leave unaffected the permits price, if it alters the AOA. -- Highlights: •Relationship between the market for permits and the output market of regulated sectors. •Analysis of CO 2 prices and banking. •Impact of a recent environmental policy measure (backloading) on CO 2 prices

  8. Permit trading and credit trading

    DEFF Research Database (Denmark)

    Boom, Jan-Tjeerd; R. Dijstra, Bouwe

    This paper compares emissions trading based on a cap on total emissions (permit trading) and on relative standards per unit of output (credit trading). Two types of market structure are considered: perfect competition and Cournot oligopoly. We find that output, abatement costs and the number...... of firms are higher under credit trading. Allowing trade between permit-trading and credit-trading sectors may increase in welfare. With perfect competition, permit trading always leads to higher welfare than credit trading. With imperfect competition, credit trading may outperform permit trading....... Environmental policy can lead to exit, but also to entry of firms. Entry and exit have a profound impact on the performance of the schemes, especially under imperfect competition. We find that it may be impossible to implement certain levels of total industry emissions. Under credit trading several levels...

  9. The comparison of license management procedure for nuclear power plant in China and United States

    International Nuclear Information System (INIS)

    Yu Zusheng

    2006-01-01

    'Tow steps' license management procedure for nuclear power plant has been performed bas- ted on the requirement of 10CFR Part50-DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES in United States since last century fifties. In order to ulterior reduce the risk of investment and technical for new construction nuclear power plants, new regulations 'One step' license management procedure-10CFR Part52-EARLY SITE PERMITS; STANDARD DESIGN CERTIFICATIONS; AND COMBINED LICENSES FOR NUCLEAR POWER PLANTS issued in 1989. The new regulations has been adopted by new design of nuclear power plant, for example AP1000. ‘The similar tow steps’ license management procedure for nuclear power plant has been performed basted on the requirement of HAFO01/01 Rules for the Implementation of Regulations on the Safety Regulation for Civilian Nuclear Installations of the People's Re- public of China Part One: Application and Issuance of Safety License for Nuclear Power Plant (December 1993) in China since last century nineties. This article introduces and compares the requirements and characteristics of above license management procedure for nuclear power plant in China and United States. (author)

  10. Expertise and participation of the population in the context of nuclear risk: democracy and environmental licensing of Angra 3 nuclear power plant

    Directory of Open Access Journals (Sweden)

    Gláucia Silva

    2010-01-01

    Full Text Available This article discusses the specificity of citizens' "participation" in contexts of decision-making on the acceptance of nuclear risk, demonstrating that such acceptance depends on mediation by professionals who are willing to translate the typical scientific jargon of technical reports and/or produce their own reports, by way of counter-expertise; otherwise, lay people are unable to confer scientific legitimacy to their arguments. The basic empirical references for the current analysis are the recurrent themes from public hearings organized for the licensing of two Brazilian nuclear power plants using German technology, Angra 2 and Angra 3, with emphasis on the latter, now undergoing prior environmental licensing. The forms of "social control" engendered in France serve as a counterpoint for developing the article's argument.

  11. Reactors licensing: proposal of an integrated quality and environment regulatory structure for nuclear research reactors in Brazil

    International Nuclear Information System (INIS)

    Serra, Reynaldo Cavalcanti

    2014-01-01

    A new integrated regulatory structure based on quality and integrated issues has been proposed to be implemented on the licensing process of nuclear research reactors in Brazil. The study starts with a literature review about the licensing process in several countries, all of them members of the International Atomic Energy Agency. After this phase it is performed a comparative study with the Brazilian licensing process to identify good practices (positive aspects), the gaps on it and to propose an approach of an integrated quality and environmental management system, in order to contribute with a new licensing process scheme in Brazil. The literature review considered the following research nuclear reactors: Jules-Horowitz and OSIRIS (France), Hanaro (Korea), Maples 1 and 2 (Canada), OPAL (Australia), Pallas (Holand), ETRR-2 (Egypt) and IEA-R1 (Brazil). The current nuclear research reactors licensing process in Brazil is conducted by two regulatory bodies: the Brazilian National Nuclear Energy Commission (CNEN) and the Brazilian Institute of Environment and Renewable Natural Resources (IBAMA). CNEN is responsible by nuclear issues, while IBAMA by environmental one. To support the study it was applied a questionnaire and interviews based on the current regulatory structure to four nuclear research reactors in Brazil. Nowadays, the nuclear research reactor’s licensing process, in Brazil, has six phases and the environmental licensing process has three phases. A correlation study among these phases leads to a proposal of a new quality and environmental integrated licensing structure with four harmonized phases, hence reducing potential delays in this process. (author)

  12. Interim staff position on environmental qualification of safety-related electrical equipment: including staff responses to public comments. Regulatory report

    International Nuclear Information System (INIS)

    Szukiewicz, A.J.

    1981-07-01

    This document provides the NRC staff positions regarding selected areas of environmental qualification of safety-related electrical equipment, in the resolution of Unresolved Safety Issue A-24, 'Qualification of Class IE Safety-Related Equipment.' The positions herein are applicable to plants that are or will be in the construction permit (CP) or operating license (OL) review process and that are required to satisfy the requirements set forth in either the 1971 or the 1974 version of IEEE-323 standard

  13. License renewal in the United States

    International Nuclear Information System (INIS)

    Brons, Jack

    2002-01-01

    license renewal applications, and virtually every reactor in the United States is now expected to apply. License renewal is economically beneficial since the plants are fully amortized and operating and maintenance costs of an efficiently-operating plant is low. Continued operation of nuclear plants, by far the largest source of emission-free electricity generation in the U.S., will also bring environmental benefits. Nuclear plant operations avoided emissions of nearly 175 million metric tons of carbon dioxide in 2000, in addition to millions of tons of sulfur dioxide and nitrogen oxide. NEI continues to work with the NRC on generic principles and streamlining regulations, with the aim of further reducing both the time and the cost of license renewal. (author)

  14. Low-Level Burial Grounds Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1989-01-01

    The single dangerous waste permit identification number issued to the Hanford Site by the US Environmental Protection Agency and the Washington State Department of Ecology is US Environmental Protection Agency/State Identification Number WA 7890008967. This identification number encompasses a number of waste management units within the Hanford Site. Westinghouse Hanford Company is a major contractor to the US Department of Energy-Richland Operations Office and serves as co-operator of the Low-Level Burial Grounds, the waste management unit addressed by this permit application. The Low-Level Burial Grounds Dangerous Waste Permit Application consists of both a Part A and a Part B Permit Application. The original Part A, submitted in November 1985, identified landfills, retrievable storage units, and reserved areas. An explanation of subsequent Part A revisions is provided at the beginning of the Part A section. Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology

  15. 40 CFR 72.73 - State issuance of Phase II permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false State issuance of Phase II permits. 72.73 Section 72.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.73 State issuance of Phase II permits...

  16. Collaborative Approaches in Developing Environmental and Safety Management Systems for Commercial Space Transportation

    Science.gov (United States)

    Zee, Stacey; Murray, D.

    2009-01-01

    The Federal Aviation Administration (FAA), Office of Commercial Space Transportation (AST) licenses and permits U.S. commercial space launch and reentry activities, and licenses the operation of non-federal launch and reentry sites. ASTs mission is to ensure the protection of the public, property, and the national security and foreign policy interests of the United States during commercial space transportation activities and to encourage, facilitate, and promote U.S. commercial space transportation. AST faces unique challenges of ensuring the protection of public health and safety while facilitating and promoting U.S. commercial space transportation. AST has developed an Environmental Management System (EMS) and a Safety Management System (SMS) to help meet its mission. Although the EMS and SMS were developed independently, the systems share similar elements. Both systems follow a Plan-Do-Act-Check model in identifying potential environmental aspects or public safety hazards, assessing significance in terms of severity and likelihood of occurrence, developing approaches to reduce risk, and verifying that the risk is reduced. This paper will describe the similarities between ASTs EMS and SMS elements and how AST is building a collaborative approach in environmental and safety management to reduce impacts to the environment and risks to the public.

  17. What it took to get an NRC license for centralized incineration

    International Nuclear Information System (INIS)

    DiSalvo, R.; Zielenbach, W.

    1987-01-01

    In 1982, Battelle joined five other commercial generators of low level radioactive waste in conducting a study of the technical and economic feasibility and the licensability of a central facility for incinerating LLW. The project generated a license application to the USNRC and supporting documentation related to the safety and environmental impacts of the facility. After thorough review, the NRC has issued a Finding of No Significant Impact and the associated license authorization, which is the first of its kind for an incineration facility

  18. Quality control and the substantive influence of environmental impact assessment in Finland

    International Nuclear Information System (INIS)

    Poeloenen, Ismo

    2006-01-01

    This paper focuses on the challenges concerning the quality assurance of environmental impact statements (EIS) in Finland and the European Union. Moreover, the linkage between environmental impact assessment and decision-making is examined from a legal point of view. In addition, the paper includes some comparative remarks concerning the content requirements of examination of alternatives. The study reveals that a significant problem of the Finnish EIA system is the lack of efficient access to a judicial procedure to challenge the quality and completeness of an EIS. Another pitfall is the fact that in certain permit procedures, environmental consideration is so limited that only a minor part of the EIA can be taken into account. In its current state, EIA legislation in the EU and in Finland does not guarantee that the assessment results filter into decision-making. From the national point of view, the shortcomings can be addressed by amending current legislation concerning licensing procedures so that authorities have the competence and the duty to take environmental matters widely into account in the permit consideration. At the European level, a legislative alternative could be to strengthen the substantive element of the EIA Directive (85/337/EEC). This would increase the weight of EIA related arguments in the national appellate procedures and contribute, in some cases significantly, to the substantive influence of EIA in decision-making

  19. AP1000R licensing and deployment in the United States

    International Nuclear Information System (INIS)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.; Castiglione, L. L.

    2012-01-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed

  20. ITER licensing

    International Nuclear Information System (INIS)

    Gordon, C.W.

    2005-01-01

    ITER was fortunate to have four countries interested in ITER siting to the point where licensing discussions were initiated. This experience uncovered the challenges of licensing a first of a kind, fusion machine under different licensing regimes and helped prepare the way for the site specific licensing process. These initial steps in licensing ITER have allowed for refining the safety case and provide confidence that the design and safety approach will be licensable. With site-specific licensing underway, the necessary regulatory submissions have been defined and are well on the way to being completed. Of course, there is still work to be done and details to be sorted out. However, the informal international discussions to bring both the proponent and regulatory authority up to a common level of understanding have laid the foundation for a licensing process that should proceed smoothly. This paper provides observations from the perspective of the International Team. (author)

  1. 77 FR 58590 - Determining Technical Adequacy of Probabilistic Risk Assessment for Risk-Informed License...

    Science.gov (United States)

    2012-09-21

    ... reactors or for activities associated with review of applications for early site permits and combined licenses (COL) for the Office of New Reactors (NRO). DATES: The effective date of this SRP update is... Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2010-0138. Address...

  2. 2013 EPA Vessels General Permit (VGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — Information for any vessel that submitted a Notice of Intent (NOI), Notice of Termination (NOT), or annual report under EPA's 2013 Vessel General Permit (VGP)....

  3. Portsmouth Gaseous Diffusion Plant environmental monitoring report for calendar year 1981

    International Nuclear Information System (INIS)

    Acox, T.A.; Anderson, R.E.; Hary, L.F.; Klein, L.S.; Vausher, A.L.

    1982-04-01

    At the Portsmouth Gaseous Diffusion Plant all effluent streams are sampled regularly and analyzed to assess compliance with applicable environmental standards. Radioactivity is measured in air, water, food, soil, and sediments; and radiation doses to the public are calculated. All public radiation doses from process effluents are well within Department of Energy and US EPA standards. Non-radioactive effluents either presently comply with federal standards or will comply upon completion of planned projects. The environmental impact of effluents from cleaning and decontamination operations has been reduced through flow reduction and improved chemical treatment. CY-1981 was the first full year under a new National Pollutant Discharge. Elimination System (NPDES) permit for liquid effluents; compliance with the permit's discharge limits did not present any significant problems. Engineering is proceeding on projects to be constructed through 1985 to further reduce the impact of liquid effluents. A new licensed sanitary landfill utilizing the area fill method went into operation in July 1981. Although neither the State of Ohio nor the federal government has established standards for fluoride in the atmosphere or in vegetation, fluorides are monitored because they are used extensively in the gaseous diffusion process

  4. 2011 EPA Pesticide General Permit (PGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The 2011 EPA Pesticide General Permit (PGP) covers discharges of biological pesticides, and chemical pesticides that leave a residue, in areas where EPA is the NPDES...

  5. Permitting plan for project W-320 tank 241-C-106 waste retrieval sluicing system (WRSS)

    International Nuclear Information System (INIS)

    Symons, G.A.

    1997-01-01

    This document describes the permitting plan for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). A comprehensive review of environmental regulations have indicated that several environmental reviews [e.g. National Environmental Policy Act (NEPA), State Environmental Policy Act (SEPA)], permits, and approvals are required prior to construction or operation of the facility. The environmental reviews, permits and approvals, as well the regulatory authority, potentially applicable to the Tank 241-C-106 WRSS include the following: for NEPA - U.S. Department of Energy-Headquarters: Action Description Memorandum, Environmental Assessment, Categorical Exclusion, and Environmental Impact Statement; and for SEPA - State of Washington Department of Ecology (Ecology) Determination of Nonsignificance, Mitigated Determination of Nonsignificance, Determination of Significance, and SEPA Environmental Checklist

  6. AIR PERMIT COMPLIANCE FOR WASTE RETRIEVAL OEPRATIONS INVOLVING MULTI-UNIT EMISSIONS

    International Nuclear Information System (INIS)

    SIMMONS FM

    2007-01-01

    Since 1970, approximately 38,000 suspect-transuranic and transuranic waste containers have been placed in retrievable storage on the Hanford Site in the 200 Areas burial grounds. Hanford's Waste Retrieval Project is retrieving these buried containers and processing them for safe storage and disposition. Container retrieval activities require an air emissions permit to account for potential emissions of radionuclides. The air permit covers the excavation activities as well as activities associated with assaying containers and installing filters in the retrieved transuranic containers lacking proper venting devices. Fluor Hanford, Inc. is required to track radioactive emissions resulting from the retrieval activities. Air, soil, and debris media contribute to the emissions and enabling assumptions allow for calculation of emissions. Each of these activities is limited to an allowed annual emission (per calendar year) and .contributes to the overall total emissions allowed for waste retrieval operations. Tracking these emissions is required to ensure a permit exceedance does not occur. A tracking tool was developed to calculate potential emissions in real time sense. Logic evaluations are established within the tracking system to compare real time data against license limits to ensure values are not exceeded for either an individual activity or the total limit. Data input are based on field survey and workplace air monitoring activities. This tracking tool is used monthly and quarterly to verify compliance to the license limits. Use of this tool has allowed Fluor Hanford, Inc. to successfully retrieve a significant number of containers in a safe manner without any exceedance of emission limits

  7. 40 CFR 76.9 - Permit application and compliance plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Permit application and compliance plans. 76.9 Section 76.9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.9 Permit application and...

  8. The delay of the environmental licensing in oil activities and legal implications regarding the oil block; O atraso do licenciamento ambiental nas atividades petroliferas e as implicacoes atinentes ao cumprimento de prazo de bloco licitados

    Energy Technology Data Exchange (ETDEWEB)

    Cavalcante, Hellen Priscilla Marinho; Xavier, Yanko Marcius de Alencar [Universidade Federal do Rio Grande do Norte (UFRN), Natal, RN (Brazil)

    2012-07-01

    This work intends to demonstrate how the delay in issuing environmental licenses by the appropriate bodies affect the correct fulfillment of the exploratory phase of blocks already bid and rendered to the lessees. Thus, it will be conducted a study of the pertaining legislation to the subject, such as Law n. 6.938/81 and its recent amendment by Complementary Law n. 140/2011, as well as the Resolutions issued by the National Environmental Council (CONAMA), addressing the vital importance of the environmental licensing process to the preservation of the environment ante the installation of potentially harmful activities. It is also acknowledged, through the analysis of articles and paragraphs, that there is a legal gap concerning the deadline for issuance of certain documents required to start the licensing procedure by the companies, which ultimately jeopardizes the fulfillment of their exploration activities in due time. Furthermore, there is not a provision regarding the return of the deadline to the lessee when it is suspended or extended due to licensing delays for reasons beyond its control, which cannot lack a reasonable answer. Therefore, as a conclusion, it will be presented a possible solution, so as to ensure the proper accomplishment of the oil activities combined with the preservation of the environment. (author)

  9. Permitting and licensing of a commercial mixed waste facility

    International Nuclear Information System (INIS)

    Sinclair, W.J.

    1995-01-01

    Federal and state regulations applicable to the Envirocare commercial mixed waste facility in Utah are discussed, with particular emphasis on Utah State Waste Policy. Waste acceptance standards of the facility are detailed. Design conflicts, due to differences between the U.S. Environmental Protection and the U.S. Nuclear Regulatory Commission, and their subsequent resolution are outlined. Other multi-jurisdictional problems and resolutions are discussed in some detail

  10. The Wm. H. Zimmer Nuclear Power Station: Draft environmental statement (Docket No. 50-358)

    International Nuclear Information System (INIS)

    1976-10-01

    The proposed action is the issuance of an operating license to the Cincinnati Gas and Electric Company, the Columbus and Southern Ohio Electric Company, and the Dayton Power and Light Company for the startup and operation of the Wm. H. Zimmer Nuclear Power Station (Docket No. 50-358) (the station), located on the Ohio River in Clermont County, about 24 miles southeast of Cincinnati, Ohio. The information in this statement represents the second assessment of the environmental impact associated with the Zimmer Nuclear Power Station pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51 of the Commission's Regulations. After receipt of an application in 1970 to construct this plant, the staff carried out a review of impact that would occur during the plant's construction and operation. This evaluation was issued as a final environmental statement in September 1972. As the result of this environmental review, a safety review, an evaluation by the Advisory Committee on Reactor Safeguards, and a public hearing in Cincinnati, Ohio, the AEC (now NRC) issued a permit in October 1972 for the construction of Unit 1 of the Zimmer Nuclear Power Station. As of June 1976, the construction of the plant was 54% complete. With a proposed fuel-loading data of April 1978, the applicant has petitioned for license to operate Unit 1 and has submitted (September 1975) the required safety and environmental reports to substantiate this petition. 96 refs., 17 figs., 34 tabs

  11. Outline for embedded topical license renewal industry perspective

    International Nuclear Information System (INIS)

    Gilchrist, Jacqueline

    1991-01-01

    This presentation describes the history of the project, selection of the Lead plant; project management, and project implementation, License renewal application contains: implementation plan; technical specifications and program changes; updated safety analysis report supplement; plant specific exemptions; environmental report update

  12. Evaluation of the environmental licensing process for small hydroelectric power plants in Minas Gerais state, Brazil; Avaliacao do processo de licenciamento ambiental para pequenas centrais hidreletricas no estado de Minas Gerais

    Energy Technology Data Exchange (ETDEWEB)

    Pedreira, Adriana Coli

    2004-07-01

    The present situation of the environmental licensing process have been slow and complicated, in relation to the current conception of the sustainable environmental development in the country. The enterprises and impacting activities are being discussed and analysed through a great number of environmental laws and specific laws to each enterprise. These laws along with the inexperience of the enterprises and of the many institutions involved in the process are an obstacle to the development. This document presents the legal and institutional aspects of the environmental licensing for the implementation of small hydroelectric power plants. Laws and doctrine related to the topic were researched and concluded for Minas Gerais State with the help of a survey with the enterprises and institutions involved in the process to find out the difficulties that influence the delay of the analysis of the SHPP. The results show that the main barriers are the non-application of the CONAMA resolution 279/2001 to the SHPP, undetermined inspection criteria, excess of environmental programs, technical incapacity, lack of financial resources, non-integration of the institutional organs, the building of SHPP in permanent preservation area, project interfering in the fish fauna, studies an environmental impact with then reports and public audiences. Finally, concludes that the difficulties are based on the non-integration of the institutions and also, being recent, on the inexperience of the actors involved. Therefore, the study suggests on increase of the technical body in the institutions and training of their analysts; hiring of specialized consultancy, implantation of an environmental integrated system, social communication program in the planning phase, fulfillment of the CONAMA resolution 279/2001; integration of public ministry representatives in the licensing organs; application of planning and zoning, deadlines and legal imposition of these deadlines in order to supply the

  13. Federal/State cooperation in the licensing of a nuclear power project. A joint licensing process between the US Nuclear Regulatory Commission and the Washington State Energy Facility Site Evaluation Council

    International Nuclear Information System (INIS)

    1984-05-01

    This report summarizes and documents a joint environmental review and licensing process established between the US Nuclear Regulatory Commission (NRC) and the Washington State Energy Facility Site Evaluation Council (EFSEC) in 1980-1983 for the Skagit/Hanford Nuclear Project (S/HNP). It documents the agreements made between the agencies to prepare a joint environmental impact statement responsive to the requirements of the National Environmental Policy Act of 1969 (NEPA) and the Washington State Environmental Policy Act. These agreements also established protocol to conduct joint public evidentiary hearings on matters of mutual jurisdiction, thereby reducing the duplication of effort and increasing the efficiency of the use of resources of federal and state governments and other entities involved in the process. This report may provide guidance and rationale to licensing bodies that may wish to adopt some of the procedures discussed in the report in the event that they become involved in the licensing of a nuclear power plant project. The history of the S/HNP and of the agreement processes are discussed. Discussions are provided on implementing the joint review process. A separate section is included which presents independent evaluations of the process by the applicant, NRC, and EFSEC

  14. Web Air Permits (WAP R7)

    Data.gov (United States)

    U.S. Environmental Protection Agency — THIS DATA ASSET NO LONGER ACTIVE: This is metadata documentation for Web Air Permits in Region 7 (WAP R7), a Lotus Notes application that once tracked comment...

  15. 40 CFR 96.223 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.223 Section 96.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal...

  16. 40 CFR 96.123 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.123 Section 96.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal...

  17. 40 CFR 97.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.323 Section 97.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... authority, as necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision...

  18. Permits for coal-fired power plants under scrutiny

    International Nuclear Information System (INIS)

    Hoekstra, B.

    2011-01-01

    The attorney-general of the European Court of Justice offered advice to the European Judge on the prejudicial questions of the Department of Administrative Law of the Council of State in the framework of appeal cases against environmental permits of three planned power plants in the Netherlands. The advice may have large consequences for these permits. [nl

  19. Permit to Work System in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Shyen, A.K.S.; Azwafarina Zarmira Aznan; Md Derus Ibrahim

    2015-01-01

    A Permit-To-Work System is an essential part of the job risk assessment process. An effective Permit-To-Work System would help to prevent accident that usually involves maintenance and construction activities. In Malaysian Nuclear Agency, Radiation Safety and Health Division (BKS) has been given the responsibility to implement the system in order to fulfill the requirement of providing a safe and healthy workplace and environment for its employees as pledged in the Occupational Safety, Health and Environmental Policy. This paper presents the roles and functions of Permit-To-Work System, together with the process flow and challenges ahead. (author)

  20. 32 CFR 651.10 - Actions requiring environmental analysis.

    Science.gov (United States)

    2010-07-01

    ... logistics; RDT&E; procurement; personnel assignment; real property and facility management (such as master... engineering, laser testing, and electromagnetic pulse generation. (i) Leases, easements, permits, licenses, or...

  1. Systems engineering and the licensing of Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kulesa, T., E-mail: tkulesa@us.ibm.com [IBM, Philidelphia, Pennsylvania (United States); Soderholm, K., E-mail: Kristiina.Soderholm@fortum.com [Fortum Power (Finland); Fechtelkotter, P., E-mail: pfech@us.ibm.com [IBM, Boston, Massacheusets (United States)

    2014-07-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  2. Systems engineering and the licensing of Small Modular Reactors

    International Nuclear Information System (INIS)

    Kulesa, T.; Soderholm, K.; Fechtelkotter, P.

    2014-01-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  3. 76 FR 303 - Alaska: Adequacy of Alaska's Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2011-01-04

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Parts 239 and 258 [EPA-EPA-R10-RCRA-2010-0953; FRL-9247-5] Alaska: Adequacy of Alaska's Municipal Solid Waste Landfill Permit Program AGENCY: Environmental... modification of its approved Municipal Solid Waste Landfill (MSWLF) permit program. On March 22, 2004, EPA...

  4. Longitudinal Study of Driver Licensing Rates among Adolescents and Young Adults with Autism Spectrum Disorder

    Science.gov (United States)

    Curry, Allison E.; Yerys, Benjamin E.; Huang, Patty; Metzger, Kristi B.

    2018-01-01

    Driving may increase mobility and independence for adolescents with autism without intellectual disability (autism spectrum disorder); however, little is known about rates of licensure. To compare the proportion of adolescents with and without autism spectrum disorder who acquire a learner's permit and driver's license, as well as the rate at…

  5. Licensing procedure for nuclear power in Sweden. An international look with lessons for Sweden

    International Nuclear Information System (INIS)

    Gaahlin, Emil; Nilsson, Isabelle; Pettersson, Maria; Soederholm, Patrik

    2011-02-01

    In this study we present an in-depth analysis of the existing licensing procedure for nuclear power in Sweden, and the related processes towards different public authorities. In order to put the existing legislation into context we also analyze the legal and political prerequisites for the establishment of nuclear reactors during the 1970s. The purpose of this report is thus to: (a) analyze the legal and political conditions under which the existing nuclear power plants in Sweden were built; and (b) review and analyze the existing licensing procedure for nuclear power in the country. Four main statutes (and several subordinated regulations) apply in connection with the establishment of a new nuclear plant in Sweden, including the adoption of physical plans, a principal governmental decision on the permissibility of the plant and at least five major licenses. Physical planning according to the Planning and Building Act is primarily a municipal responsibility. A plan has to meet certain environmental requirements; not least the 'provisions on efficient management of natural resources' in the Environmental Code, indicating how different kinds of land and water areas should be used and thereby direct the location of different installations. The Swedish rules are complex and vague in many respects, and may therefore imply major uncertainties for a prospective investor. The legal protection is less unclear if an area is of national interest for a specific purpose, such as nature conservation, where it normally would not be possible to locate, say, a nuclear power plant. An area may also be of national interest for nuclear plants, which of course significantly alters the preconditions in favour of the plant project. The physical planning procedure comprises an 'environmental consideration' of the plan, including an 'environmental impact assessment' (EIA), provided the plan is likely to have significant effects on the environment. This 'programmatic EIA' does however not

  6. 40 CFR 97.123 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.123 Section 97.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal of the CAIR NOX...

  7. Reactor licensing process: a status report

    International Nuclear Information System (INIS)

    Long, J.A.

    1977-01-01

    The Nuclear Regulatory Commission (NRC), in its review of applications for licenses to construct and operate nuclear power plants, is required to consider those measures necessary to ensure the protection of the health and safety of the public and the environment. The article discusses the NRC staff procedures and policies for conducting the detailed safety, environmental, and antitrust reviews that provide the basis for these assurances. Included is a discussion of the improvements to the licensing process currently being proposed or implemented to enhance its stability and predictability for the benefit of all involved with the regulation of nuclear power. The views and opinions expressed in the article are those of the author alone and do not represent positions of the NRC

  8. The importance of multidisciplinary action for the environmental licensing process in the PETROBRAS/UN-RIO (Unidade de Negocio de Exploracao e Producao do Rio de Janeiro); A importancia da acao multidisciplinar em processos de licenciamento ambiental na Unidade de Negocio de Exploracao e Producao do Rio de Janeiro - UN-RIO, da PETROBRAS

    Energy Technology Data Exchange (ETDEWEB)

    Rodrigues, Aline W.L.; Vidal, Roseane D.M.; Rocha, Valmir G. da [PETROBRAS, Rio de Janeiro, RJ (Brazil). Unidade de Negocio de Exploracao e Producao

    2004-07-01

    This paper describes the workings of the so-called Environmental Licensing Group from PETROBRAS's UN-RIO's SMS division (Safety, Health and the Environment Division). It emphasizes the importance of multidisciplinary action in the environmental licensing process of activities related to the transference and production of oil and gas, especially in a company the size and importance like PETROBRAS. The effectiveness of the system adopted by UN-RIO is verified by the results already achieved by the group, with the successful licensing of its activities. For a company like PETROBRAS, with a great number of activities simultaneously being licensed, it is extremely important that there exists a control, not only of the information that is being sent to the Environmental Agency as a follow-up of the several licensing processes, so that Licenses can be obtained in time and without complications. (author)

  9. Licensing of New Nuclear Power Plants in Canada

    International Nuclear Information System (INIS)

    Schwarz, Garry; Miller, Doug

    2011-01-01

    The regulatory process for new power plant licensing in Canada, from receipt of the initial application to commercial operation, can be divided into three phases: - Environmental Assessment (EA) and License to Prepare Site; - License to Construct; and - License to Operate. The Nuclear Safety and Control Act (NSCA) does not have provisions for combined licenses for site preparation, construction, or operation. Separate licenses must, therefore, be granted for each phase, and would be issued in sequence. However, applications to prepare a site, to construct and to operate a new nuclear power plant could be assessed in parallel. The total duration from the application for the License to Prepare Site to the issuance of the License to Operate (which is a prerequisite for first fuel load) has been established as 9 years subject to certain factors. To help facilitate this timeline, the CNSC has undertaken an aggressive program of documenting regulatory practices, requirements and guidance to assist applicants in submitting complete applications. Working level procedures to assist CNSC staff in their review of submissions are also under development. Extensive program and project management has been introduced to ensure that timelines will be achieved. In parallel with the above activities, regulatory oversight measures to be employed during site preparation activities and plant construction and commissioning are also being developed. On the international front, the CNSC is participating in the MDEP program to leverage the resources and knowledge of other national regulatory authorities in reviews the CNSC is undertaking. The CNSC also participates in IAEA and other international activities to utilize/adapt international practices as appropriate in Canada. (authors)

  10. Better Demand Signal, Better Decisions? Evaluation of Big Data in a Licensed Remanufacturing Supply Chain with Environmental Risk Considerations.

    Science.gov (United States)

    Niu, Baozhuang; Zou, Zongbao

    2017-08-01

    Big data ability helps obtain more accurate demand signal. However, is better demand signal always beneficial for the supply chain parties? To answer this question, we investigate a remanufacturing supply chain (RSC), where demand uncertainty is significant, and the value to reduce environmental risk is large. Specifically, we focus on a licensed RSC comprising an original equipment manufacturer (OEM) and a third-party remanufacturer (3PR). The latter pays a unit license fee to the former, and can be risk averse to the demand of remanufactured products. We show that the OEM and the risk-neutral 3PR always have incentives to improve their big data abilities to increase their profits. However, when the 3PR is risk averse, big data might hurt its profit: the value of big data is positive if its demand signal accuracy is sufficiently low. Interestingly, we find that while information sharing hurts the 3PR, it benefits the OEM as well as the supply chain. Thus, if costly information sharing is allowed, a win-win situation can be achieved. We also find that information sharing generates more valuation when the 3PR is risk averse than that when the 3PR is risk neutral. More importantly, we find that the 3PR's risk attitude and demand signal accuracy can significantly mitigate the negative environmental impact (measured by the amount of the waste): (1) the more risk neutral the 3PR is, the better the environment is; (2) the more accurate demand signal is, the better the environment is. © 2017 Society for Risk Analysis.

  11. 40 CFR 97.223 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.223 Section 97.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal of the CAIR SO2...

  12. An archaeological reconnaissance of a 14 mile section of the East Fork Poplar Creek for the Environmental Restoration Project, Anderson and Roane Counties, Tennessee

    International Nuclear Information System (INIS)

    DuVall, G.D.

    1993-01-01

    At the request of the US Army Corps of Engineers, Nashville District, Nashville, Tennessee, an archaeological reconnaissance of the potential impact areas of the Environmental Restoration Project (ERP) along the East Fork Poplar Creek was conducted during the period December 16, 1991, and March 3, 1992. The reconnaissance was conducted in response to environmental evaluations as a result of the accidental spillage of approximately 293,000 pounds of mercury, radionuclides, heavy metals and other compounds. The reconnaissance to assess adverse impacts to cultural resources located within the boundaries of Federally-licensed, permitted, funded or assisted projects was conducted in compliance with the National Historic Preservation Act of 1966, National Environmental Policy Act of 1969 and Executive Order 11593

  13. Hanford facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-01-01

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains ''umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit

  14. The importance of multidisciplinary action for the environmental licensing process in the PETROBRAS/UN-RIO (Unidade de Negocio de Exploracao e Producao do Rio de Janeiro); A importancia da acao multidisciplinar em processos de licenciamento ambiental na Unidade de Negocio de Exploracao e Producao do Rio de Janeiro - UN-RIO, da PETROBRAS

    Energy Technology Data Exchange (ETDEWEB)

    Rodrigues, Aline W.L.; Vidal, Roseane D.M.; Rocha, Valmir G. da [PETROBRAS, Rio de Janeiro, RJ (Brazil). Unidade de Negocio de Exploracao e Producao

    2004-07-01

    This paper describes the workings of the so-called Environmental Licensing Group from PETROBRAS's UN-RIO's SMS division (Safety, Health and the Environment Division). It emphasizes the importance of multidisciplinary action in the environmental licensing process of activities related to the transference and production of oil and gas, especially in a company the size and importance like PETROBRAS. The effectiveness of the system adopted by UN-RIO is verified by the results already achieved by the group, with the successful licensing of its activities. For a company like PETROBRAS, with a great number of activities simultaneously being licensed, it is extremely important that there exists a control, not only of the information that is being sent to the Environmental Agency as a follow-up of the several licensing processes, so that Licenses can be obtained in time and without complications. (author)

  15. Public Participation Planning of Environmental Impact Assessment (EIA) and Regulations: Analysis of Inconsistency for Some Cases in Indonesia

    Science.gov (United States)

    Hindrayani, Aniek; Purwanto

    2018-02-01

    The failure in community involvement during the environmental documents planning may result in the failure of the planned project implementation. This study aims to determine the gap between practices and regulations that apply to the process of community involvement in the environmental documents planning, and find out inconsistency of implementation on each stakeholder in the planning of the Environmental Impact Assessment (EIA) and the environmental permit. The method used was qualitative through interview and literature study which is analyzed using triangulation model and presented in the form of concept map. The results of the study indicate that 1) the determination of community representatives based on the criteria of the impacted communities is not clearly described, 3) suggestions, opinions, and responses to the environmental impact management are not well implemented by the project proponent, 3) implementation of the environmental management of other licensed activities affecting the behavior (4) stakeholders (project proponent, EIA consultants, and EIA appraisal committee) do not play their role as mandated in applicable legislation.

  16. A model record of technologies for use in a compatible projects for environmental licensing of wind farms; Um modelo de registro das tecnologias para uso na compatibilizacao de projetos para licenciamento ambiental de parques eolicos

    Energy Technology Data Exchange (ETDEWEB)

    Tavares Junior, Wandemberg; Oliveira, Lucia Maria Barbosa [Universidade de Fortaleza (UNIFOR), CE (Brazil)

    2008-07-01

    This article presents the development of a model for survey and registration of technologies that can be inserted in the process of reconciliation of the subjects of the project for environmental licensing of wind farms. It was used a basis for the theoretical model of the Simultaneous Engineering and Failure Mode and Effect Analysis - FMEA. Given the importance that the wind has for the pursuit of sustainable development, this work had as its main objective to contribute to the reduction of negative indices, proposing improvements to the process of project for environmental licensing of wind farms. (author)

  17. Licensing of spent fuel storage facility including its physical protection in the Czech Republic

    International Nuclear Information System (INIS)

    Fajman, V.; Sedlacek, J.

    1992-01-01

    The current spent fuel management policies as practised in the Czech Republic are described, and the conception of the fuel cycle back end is outlined. The general principles and the legislative framework are explained of the licensing process concerning spent fuel interim storage facilities, including the environmental impact assessment component. The history is outlined of the licensing process for the spent fuel storage facility at the Dukovany NPP site, including the licensing of the transport and storage cask. The basic requirements placed on the physical safeguarding of the facility and on the licensing process are given. (J.B.). 13 refs

  18. 14 CFR 420.17 - Bases for issuance of a license.

    Science.gov (United States)

    2010-01-01

    ...) Issuing a license would not jeopardize foreign policy or national security interests of the United States... § 420.15; (2) The FAA has completed an analysis of the environmental impacts associated with the...

  19. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  20. 40 CFR 239.4 - Narrative description of state permit program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Narrative description of state permit program. 239.4 Section 239.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... Narrative description of state permit program. The description of a state's program must include: (a) An...

  1. Recent changes in UK legislation and the licensing of radiopharmacies

    Energy Technology Data Exchange (ETDEWEB)

    Monger, P N [Medicines Inspectorate, London (United Kingdom). Medicine Control Agency

    1992-06-01

    The implications of the recent loss of Crown Immunity to radiopharmacy in the NHS are reviewed. The options available are that the preparation of radiopharmaceuticals within a hospital will either be under the control of a pharmacist or be an activity licensed as 'Specials' manufacture. In the latter case requirements for inspection by the Medicines Control Agency, fees payable and the need for involvement of a pharmacist are reviewed. Requirements for the grant of a Specials Manufacturing Licence are presented in some detail. Reference is made to established and published sources of guidance, official and otherwise. Consideration is given to: staffing and personnel, open and closed procedures, environmental standards, handling of blood products, use of isolators, quality control and quality assurance, licensed and unlicensed materials, sterility testing, broth transfer tests, environmental monitoring and documentation. (author).

  2. 76 FR 11523 - Atomic Safety and Licensing Board; AREVA Enrichment Services, LLC (Eagle Rock Enrichment Facility...

    Science.gov (United States)

    2011-03-02

    ... and Licensing Board; AREVA Enrichment Services, LLC (Eagle Rock Enrichment Facility); Notice of... Governmental Entities Regarding Environmental Portion of Enrichment Facility Licensing Proceeding February 24.... White. In this 10 CFR part 70 proceeding regarding the request of applicant AREVA Enrichment Services...

  3. AP1000{sup R} licensing and deployment in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.; Castiglione, L. L. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing

  4. Licensing procedures for Low-Level Waste disposal facilities

    International Nuclear Information System (INIS)

    Roop, R.D.; Van Dyke, J.W.

    1985-09-01

    This report describes the procedures applicable to siting and licensing of disposal facilities for low-level radioactive wastes. Primary emphasis is placed on those procedures which are required by regulations, but to the extent possible, non-mandatory activities which will facilitate siting and licensing are also considered. The report provides an overview of how the procedural and technical requirements for a low-level waste (LLW) disposal facility (as defined by the Nuclear Regulatory Commission's Rules 10 CFR Parts 2, 51, and 61) may be integrated with activities to reduce and resolve conflict generated by the proposed siting of a facility. General procedures are described for site screening and selection, site characterization, site evaluation, and preparation of the license application; specific procedures for several individual states are discussed. The report also examines the steps involved in the formal licensing process, including docketing and initial processing, preparation of an environmental impact statement, technical review, hearings, and decisions. It is concluded that development of effective communication between parties in conflict and the utilization of techniques to manage and resolve conflicts represent perhaps the most significant challenge for the people involved in LLW disposal in the next decade. 18 refs., 6 figs

  5. Potential environmental effects of energy conservation measures in northwest industries

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, M C; Gygi, K F; Hendrickson, P L

    1992-01-01

    The Bonneville Power Administration (Bonneville) has identified 101 plants in the Pacific Northwest that account for 80% of the region's industrial electricity consumption. These plants offer a precise target for a conservation program. PNL determined that most of these 101 plants were represented by 11 major industries. We then reviewed 36 major conservation technologies used in these 11 industrial settings to determine their potential environmental impacts. Energy efficiency technologies designed for industrial use may result in direct or indirect environmental impacts. Effects may result from the production of the conservation measure technology, changes in the working environment due to different energy and material requirements, or changes to waste streams. Industry type, work-place conditions, worker training, and environmental conditions inside and outside the plant are all key variables that may affect environmental outcomes. To address these issues this report has three objectives: Describe potential conservation measures that Bonneville may employ in industrial programs and discuss potential primary impacts. Characterize industrial systems and processes where the measure may be employed and describe general environmental issues associated with each industry type. Review environmental permitting, licensing, and other regulatory actions required for industries and summarize the type of information available from these sources for further analysis.

  6. Origins and framework of environmental law in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Robinson, N A

    1975-11-01

    A sensitivity for protecting the environment has opened a new field of Environmental Law, backed by government allocations, legal and administrative procedures, and public involvement. Environmental laws, however, remain responsive to new scientific and technological discoveries and expanding public pressures for both environmental protection and energy. Prior to the 1960s, there were laws to regulate resource exploitation, preserve natural areas, correct past damage, protect public health, control land use, and preserve common law and equity. Since then environmental concerns have become laws, agencies, and part of the law school curriculum. New regulations requiring accountability from the private sector, local governments, and public corporations (e.g., utilities) tend to cut across jurisdictions and require changes in governmental relationships. The legal tools available for protecting the environment include (1) regulation, such as permit and licensing systems and allocations; (2) procedural innovations, such as environmental impact analysis and reporting; (3) direct action, such as imposed air and water quality standards; (4) taxation; (5) government spending and contracting, as in solid waste disposal; (6) grants-in-aid and loans; (7) court enforcement; (8) coordinated land use; and (9) research. Citizen participation in the use of these tools has been vital to the momentum of an environmental protection concept. (150 references) (DCK)

  7. Hanford Site air operating permit application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  8. Hanford Site air operating permit application

    International Nuclear Information System (INIS)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ''regulated'' pollutants. Regulated pollutants include ''criteria'' pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ''Hazardous'' Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995

  9. Siting Practices and Site Licensing Process for New Reactors in Canada

    International Nuclear Information System (INIS)

    Vos, Marcel de

    2011-01-01

    'Siting' in Canada is composed of Site Evaluation and Site Selection. As outlined in CNSC Regulatory Document RD-346 Site Evaluation for New Nuclear Power Plants (based on IAEA NS-R-3), prior to the triggering of the Environmental Assessment (EA) and licensing processes, the proponent is expected to use a robust process to characterize proposed sites over the full life cycle of the facility, and then develop a fully documented defense of the site selection case. This case forms the backbone for submissions in support of the EA and the application for a License to Prepare Site which will be reviewed by the CNSC and other applicable federal authorities. The Environmental Assessment process and License to Prepare Site in Canada do not require a proponent to select a specific design; however, CNSC does not accept a 'black box' approach to siting. CNSC balances the level of design information required with the extent of safety assurance desired for any designs being contemplated for the proposed site. Nevertheless, the design information submitted must be sufficient to justify the site as suitable for all future licensing stages. The depth of plant design information contributes significantly to the credibility of the applicant's case for both the EA and application for License to Prepare Site. The review process utilizes an assessment plan with defined review stages and timelines. The outcome of these reviews is a series of recommendations to a federal government appointed Joint Review Panel (which also serves as a panel of the 'Commission') which, following public hearings, renders a decision regarding the EA, and subsequently, the application for a License to Prepare Site. (author)

  10. 22 CFR 161.10 - Non-Federal applicants for permits.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Non-Federal applicants for permits. 161.10 Section 161.10 Foreign Relations DEPARTMENT OF STATE ENVIRONMENTAL PROTECTION REGULATIONS FOR IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) Coordination of Other Requirements of NEPA § 161...

  11. Technology neutral licensing requirements: have we been successful?

    International Nuclear Information System (INIS)

    Jamieson, T.

    2009-01-01

    The Canadian Nuclear Safety Commission (CNSC) is Canada's nuclear regulator. In preparation for the licensing of the next generation of nuclear reactors in Canada, the CNSC has made major changes in its processes and procedures associated with all aspects of the licensing life cycle. These include: development of key regulatory documents outlining the CNSC expectations for the design and siting of new reactors; creation of applicant guidelines for completing licensing applications; creation of a comprehensive set of review guides, specifying how topics in applications are to be reviewed; performing pre-project design reviews for proposed new reactor technologies; and streamlining processes wherever possible, such as performing the environmental assessment and license to prepare site activities in parallel. The predicted workload associated with the nuclear renaissance in Canada is real. The CNSC is currently performing: 4 pre-project design reviews (for AECL's ACR-1000 and EC-6, Areva's EPR and Westinghouse's AP-1000), has received applications for 4 new builds (at Darlington, Bruce, Nanticoke and in Alberta) and is in the midst of performing the combined environmental assessment and license to prepare site phases for these sites. This is in addition to the work associated with: the licensing of new uranium mines; oversight of the existing reactor fleet; refurbishments at Bruce/Gentilly/Point Lepreau; license renewal for the NRU reactor; and oversight of our general client base of over 5000 licensees. In this presentation, experience to date with these new processes and procedures will be discussed, including: status of the current new build projects; anticipated new activities; lessons learned, especially the technology neutral approach; application to our other licensed activities, including non-power reactors; and work underway to further develop CNSC methods. Qualifications Needed to Design, Construct and Manufacture Nuclear Systems and Equipment, C. Voutsinos

  12. Final Environmental Impact Statement to construct and operate a facility to receive, store, and dispose of 11e.(2) byproduct material near Clive, Utah (Docket No. 40-8989)

    International Nuclear Information System (INIS)

    1993-08-01

    A Final Environmental Impact Statement (FEIS) related to the licensing of Envirocare of Utah, Inc.'s proposed disposal facility in Tooele county, Utah (Docket No. 40-8989) for byproduct material as defined in Section 11e.(2) of the Atomic Energy Act, as amended, has been prepared by the Office of Nuclear Material Safety and Safeguards. This statement describes and evaluates the purpose of and need for the proposed action, the alternatives considered, and the environmental consequences of the proposed action. The NRC has concluded that the proposed action evaluated under the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, is to permit the applicant to proceed with the project as described in this Statement

  13. The SHP's environmental licensing and the social communication: case study analysis of Funil and Carangola; O licenciamento ambiental de PCH e a comunicacao social: analise dos estudos de caso de Funil e Carangola

    Energy Technology Data Exchange (ETDEWEB)

    Galhardo, Camila Rocha

    2007-07-01

    Lately, concepts and paradigms have gone through constant alterations, due to high-speed growth the globe faces the dilemma of how to keep this growing and guarantee the survival conditions for next generations. Consequently, it comes into view the requirement for the discussion towards environment preservation and sustainability. In addition to this, humanity has been seeking for solutions to this impasse and the Brazilian Electric Sector equally has looked for alternatives since the beginning of electrification in the country, in early 19{sup th} Century, when the first Small Hydropower Plants (SHPs) were installed to provide energy to the industrial development period. Moreover, at present, this same category of energy generation plant represents a good opportunity, for the reason that they are framed as one of the sources of energy that is considered renewable or less pollutant. In the past years, technological evolution has been accompanied by the national industry of equipment and also the environmental legislation has created tools to mitigate the impacts of a Small Hydroelectric Plants (SHPs). The present research has aimed not only to present in its bibliographical revision the evolution of SHPs concept associated with the environmental aspects but also the application of techniques of social communication in the environmental license process. Furthermore it has looked for new communicative applicable tools in search of a larger public participation among the involved players, which results in important premises for the sustainability course of action. In order to attend those goals, two processes of SHP licensing were analyzed in Minas Gerais State, with main focus in the included Social Communication Program in the Plan of Environmental Control foreseen by the resolution number 006/87 of CONAMA (National Environmental Council). Finally, this research intended to present communicative feasible tools in the dimensioning of the participating actions in the

  14. IRIS project update: status of the design and licensing activities

    International Nuclear Information System (INIS)

    Petrovic, B.; Carelli, M.

    2004-01-01

    This paper presents an overview of the current status of the IRIS (International Reactor Innovative and Secure) project, focusing on the design and licensing activities. An update relative to the previous presentation at the 4th HND Conference is provided, highlighting some of the main accomplishments over the past two years. After successfully completing the conceptual design phase, IRIS is now finalizing the preliminary design as well. The pre-application licensing review with the U.S. NRC has been initiated in October of 2002. The safety-by-design approach and PRA-guided design open the possibility to aim for licensing not requiring off-site emergency response planning. Multiple single-unit and twin-unit site layouts have been developed within the ESP (Early Site Permit) program currently pursued by three U.S. power utilities. Desalination and district heating options have recently been added to the base design. Staggered construction schedules of multiple units may be applied to optimize cash-flow and minimize the required investment, making IRIS a financially attractive option, even for economies with limited investment capabilities. Because of its modularity, compatibility with smaller/medium grids, and enabling gradual build of new generating capacity matching the needs, IRIS has a large potential in the worldwide market.(author)

  15. Recycled Water Reuse Permit Renewal Application for the Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Mike [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistent with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.

  16. Air quality permits in Texas and New Mexico

    International Nuclear Information System (INIS)

    Fusselman, D.K.; Hofmann, J.E.

    1991-01-01

    Permitting gas processing equipment ranges from fairly simple procedures under the Texas Air Control Board (TACB) Standard Exemption List and the New Mexico Environmental Improvement Division (NMEID) Registration Regulations to an extremely complicated procedure requiring a federal Prevention of Significant Deterioration (PSD) and/or non-attainment review. The following topics relating to obtaining air permits for gas plants will be addressed in this paper: Type of permit/exemption necessary for construction, Specific permit/exemption requirements, New Source Performance Standards (NSPS) Subparts KKK, LLL, GG, K, Ka and Kb, Potential effects of the Federal Clean Air Act Amendments (FCAA). This paper only addresses specific permitting concerns and requirements that apply to the natural gas production industry. The same requirements apply to other industries, with possible additional requirements of National Emission Standards for Hazardous Air Pollutants (NESHAP), NSPS other than Subparts KKK, LLL, GG, K, Ka and Kb, and non-attainment review for pollutants other than ozone

  17. 78 FR 7428 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-02-01

    ... the March 28, 2011 petition, submitted by the Louisiana Environmental Action Network (LEAN), Sierra..., 2011 to Noranda Alumina, LLC, for the operation of the alumina production plant located in Gramercy, St... production plant in Gramercy, St. James Parish, Louisiana for the following reasons: (1) The Title V Permit...

  18. Licensing of nuclear power plants, immediate implementation, constitutional appeal

    International Nuclear Information System (INIS)

    Winters, K.P.

    1980-01-01

    The decision relates to part of the licensing procedure of the Muelheim-Kaerlich Nuclear Power Station. The subject of the complaint of unconstitutionality is the immediate execution of the 7th clearance within the framework of the 1st partial permit, which had been confined by the Rhineland-Palatinate Higher Administrative Court in a decision of May 2, 1977 (DVBl. 1977, p. 730). The Federal Constitutional Court regards the complaint of unconstitutionality as being unfounded. The court expresses itself especially on the assessment, under consnitutional aspects, of the material rules and rules of procedure pertaining to the licensing of nuclear power plants and of major changes in such plants. Moreover, the dissenting opinions of Justices Dr. Simon and Professor Heussner are quoted in excerpts. The comment by K.- P. Winters regards as the nucleus of the decision and of the dissenting vote the statements about the guarantee functions procedural rules have in ensuring effective protection of human rights. In his view, these statements of constitutional law are of fundamental significance for problems of atomic law and radiation protection law. (HSCH) [de

  19. To License or Not to License Remanufacturing Business?

    Directory of Open Access Journals (Sweden)

    Zu-Jun Ma

    2018-01-01

    Full Text Available Many original equipment manufacturers (OEMs face the choice of whether to license an independent remanufacturer (IR to remanufacture their used products. In this paper, we develop closed-loop supply chain models with licensed and unlicensed remanufacturing operations to analyze the competition and cooperation between an OEM and an IR. The OEM sells new products and collects used products through trade-ins, while the IR intercepts the OEM’s cores to produce remanufactured products and sell them in the same market. We derive optimal decisions for each of the two types of firms in licensed and unlicensed remanufacturing scenarios and identify conditions under which the OEM and the IR would be most likely to cooperate with each other in implementing remanufacturing. The results show although it is beneficial for an OEM to license an IR to remanufacture its cores, it is not always necessary for an IR to accept OEM’s authorization. Moreover, we contrast the result for licensed remanufacturing scenario in the decentralized system with that in the centrally coordinated system to quantify potential inefficiency resulting from decentralization of decision making.

  20. Waste water pilot plant research, development, and demonstration permit application

    International Nuclear Information System (INIS)

    1993-03-01

    This permit application has been prepared to obtain a research, development, and demonstration permit to perform pilot-scale treatability testing on the 242-A Evaporator process condensate waste water effluent stream. It provides the management framework, and controls all the testing conducted in the waste water pilot plant using dangerous waste. It also provides a waste acceptance envelope (upper limits for selected constituents) and details the safety and environmental protection requirements for waste water pilot plant testing. This permit application describes the overall approach to testing and the various components or requirements that are common to all tests. This permit application has been prepared at a sufficient level of detail to establish permit conditions for all waste water pilot plant tests to be conducted

  1. Technology licensing in China

    DEFF Research Database (Denmark)

    Wang, Yuandi; Li-Ying, Jason; Chen, Jin

    2015-01-01

    We explore the landscape of technology licensing among Chinese entities in the period 2000–12, using a unique database on technological licensing from the State Intellectual Property Office of China. We find that: first, among Chinese licensee organizations, firms have dominated in terms...... of the number of licensed technologies; second, the geographical distribution of licensed technologies among the provinces has gradually reached a new quantitative balance; third, utility models are the most popular technologies to be licensed and the majority of technology licensing in China has been between...... Chinese entities, and most transactions have been local within provinces; and finally, Chinese firms have gradually in-licensed newer and newer technologies, but the technologies in-licensed from foreign sources are by no means state-of-the-art. We make several suggestions for innovation policy...

  2. Early Site Permit Demonstration Program: Regulatory criteria evaluation report

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    The primary objective of the ESPDP is to demonstrate successfully the use of 10CFR52 to obtain ESPs for one or more US sites for one (or more) ALWR nuclear power plants. It is anticipated that preparation of the ESP application and interaction with NRC during the application review process will result not only in an ESP for the applicant(s) but also in the development of criteria and definition of processes, setting the precedent that facilitates ESPs for subsequent ESP applications. Because siting regulatory processes and acceptance criteria are contained in over 100 separate documents, comprehensive licensing and technical reviews were performed to establish whether the requirements and documentation are self-consistent, whether the acceptance criteria are sufficiently well-defined and clear, and whether the licensing process leading to the issuance of an ESP is unambiguously specified. The results of the technical and licensing evaluations are presented in this report. The purpose, background, and organization of the ESPDP is delineated in Section 1. Section 11 contains flowcharts defining siting application requirements, environmental report requirements, and emergency planning/preparedness requirements for ALWRS. The licensing and technical review results are presented in Section III.

  3. Early Site Permit Demonstration Program: Regulatory criteria evaluation report

    International Nuclear Information System (INIS)

    1993-03-01

    The primary objective of the ESPDP is to demonstrate successfully the use of 10CFR52 to obtain ESPs for one or more US sites for one (or more) ALWR nuclear power plants. It is anticipated that preparation of the ESP application and interaction with NRC during the application review process will result not only in an ESP for the applicant(s) but also in the development of criteria and definition of processes, setting the precedent that facilitates ESPs for subsequent ESP applications. Because siting regulatory processes and acceptance criteria are contained in over 100 separate documents, comprehensive licensing and technical reviews were performed to establish whether the requirements and documentation are self-consistent, whether the acceptance criteria are sufficiently well-defined and clear, and whether the licensing process leading to the issuance of an ESP is unambiguously specified. The results of the technical and licensing evaluations are presented in this report. The purpose, background, and organization of the ESPDP is delineated in Section 1. Section 11 contains flowcharts defining siting application requirements, environmental report requirements, and emergency planning/preparedness requirements for ALWRS. The licensing and technical review results are presented in Section III

  4. Environmental impact assessment report

    Energy Technology Data Exchange (ETDEWEB)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J.; Kim, E. H.; Choi, K. S

    2000-10-01

    This report is the revised Environmental Impact Assessment Report which was made and submitted as one of the license documents for TRIGA Research Reactor D and D Project. The Environmental Impact Assessment Report includes introduction of decommissioning plan, status of reactors and environmental impact of surroundings. Also it was assessed and analyzed on radioactivity for environment, and the plan was established to minimize radioactive material release. Finally environmental monitoring plan was established to confirm whether contaminated or not from radioactivity during decommissioning period. According to the assessment results, the risk of excess exposure will be not on environment and public. The first Environmental Impact Assessment Report was submitted to the government for the license and reviewed by Korea Institute of Nuclear Safety. The first Report was revised including answers for the questions arising from review process.

  5. Licensing procedures for Low-Level Waste disposal facilities

    Energy Technology Data Exchange (ETDEWEB)

    Roop, R.D.; Van Dyke, J.W.

    1985-09-01

    This report describes the procedures applicable to siting and licensing of disposal facilities for low-level radioactive wastes. Primary emphasis is placed on those procedures which are required by regulations, but to the extent possible, non-mandatory activities which will facilitate siting and licensing are also considered. The report provides an overview of how the procedural and technical requirements for a low-level waste (LLW) disposal facility (as defined by the Nuclear Regulatory Commission's Rules 10 CFR Parts 2, 51, and 61) may be integrated with activities to reduce and resolve conflict generated by the proposed siting of a facility. General procedures are described for site screening and selection, site characterization, site evaluation, and preparation of the license application; specific procedures for several individual states are discussed. The report also examines the steps involved in the formal licensing process, including docketing and initial processing, preparation of an environmental impact statement, technical review, hearings, and decisions. It is concluded that development of effective communication between parties in conflict and the utilization of techniques to manage and resolve conflicts represent perhaps the most significant challenge for the people involved in LLW disposal in the next decade. 18 refs., 6 figs.

  6. 45 CFR 671.6 - Applications for permits.

    Science.gov (United States)

    2010-10-01

    ... such releases; arrangements for waste management, including, without limitation, plans for waste...) The desired effective date and duration of the permit; and (5) The following certification: “I certify... (including duration). The notice shall invite the submission by interested parties, the Environmental...

  7. 15 CFR 971.406 - Environmental effects.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Environmental effects. 971.406 Section... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL RECOVERY PERMITS Issuance/Transfer....406 Environmental effects. Before issuing or transferring a commercial recovery permit, the...

  8. 75 FR 70254 - PSD and Title V Permitting Guidance for Greenhouse Gases

    Science.gov (United States)

    2010-11-17

    ... Guidance for Greenhouse Gases AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability..., ``PSD and Title V Permitting Guidance for Greenhouse Gases'' on its significant guidance Internet Web... guidance titled, ``PSD and Title V Permitting Guidance for Greenhouse Gases.'' This document has been...

  9. Process of licensing nuclear facilities (resume from the Spanish National Report for the Joint Convention, 2005)

    International Nuclear Information System (INIS)

    Prieto, N.

    2007-01-01

    The process of licensing both nuclear and radioactive facilities is governed by the Regulation on Nuclear and Radioactive Facilities (Span. Reglamento de Instalaciones Nucleares y Radiactivas, RINR), approved by Royal Decree 1836/1999, of 3 December. According to the RINR, these authorizations are granted by the Ministry of Industry, Tourism and Trade (Span. Ministerio de Industria, Turismo y Comercio, MITYC), to which the corresponding requests should be addressed, along with the documentation required in each case, The MITYC sends a copy of each request and accompanying documentation to the Nuclear Safety Council (Span. Consejo de Seguridad Nuclear, CSN) for its mandatory report.) The CSN reports are mandatory and binding, both were negative or withholding in nature with respect to the request and, when positive, as regards the conditions established. On receiving the report from the CSN, and following whatever decisions or further reports might be required in each case, the MITYC will adopt the appropriate resolution. System for the licensing of nuclear facilities. According to the definitions included in the RINR, the following are nuclear facilities: - Nuclear power plants. - Nuclear reactors. - Manufacturing facilities using nuclear fuels to produce nuclear substances and those at which nuclear substances are treated. - Facilities for the permanent storage of nuclear substances. In compliance with the RINR, the nuclear facilities require different permits or administrative authorizations for their operation, these being the preliminary or site authorization, the construction permit, the operating permit, the authorization for modification and the dismantling permit. The procedure for the awarding of each of these authorizations is regulated by the Regulation itself and is briefly described below. (author)

  10. Licensing process in Finland

    International Nuclear Information System (INIS)

    Tiippana, Petteri

    2011-01-01

    In accordance with the Nuclear Energy Act, the use of nuclear energy constitutes operations subject to license. The licensing process and conditions for granting a license is defined in the legislation. The licenses are applied from and granted by the Government. This paper discusses briefly the licensing process in Finland and also the roles and responsibilities of main stakeholders in licensing. Licensing of a nuclear power plant in Finland has three steps. The first step is the Decision in Principle (DiP). Goal of DiP is to decide whether using nuclear power is for the overall good for the Finnish society. The second step is Construction License (CL) and the goal of CL phase is to determine whether the design of the proposed plant is safe and that the participating organisations are capable of constructing the plant to meet safety goals. The third step is the Operating License (OL) and the goal of the OL phase is to determine whether the plant operates safely and licensee is capable to operate the plant safely. Main stakeholders in the licensing process in Finland are the utility (licensee) interested in using nuclear power in Finland, Ministry of Employment and the Economy (MEE), Government, Parliament, STUK, the municipality siting the plant and the general public. Government grants all licenses, and Parliament has to ratify Government's Decision in Principle. STUK has to assess the safety of the license applications in each step and give statement to the Ministry. Municipality has to agree to site the plant. Both STUK and the municipality have a veto right in the licensing process

  11. Public Participation Planning of Environmental Impact Assessment (EIA and Regulations: Analysis of Inconsistency for Some Cases in Indonesia

    Directory of Open Access Journals (Sweden)

    Hindrayani Aniek

    2018-01-01

    Full Text Available The failure in community involvement during the environmental documents planning may result in the failure of the planned project implementation. This study aims to determine the gap between practices and regulations that apply to the process of community involvement in the environmental documents planning, and find out inconsistency of implementation on each stakeholder in the planning of the Environmental Impact Assessment (EIA and the environmental permit. The method used was qualitative through interview and literature study which is analyzed using triangulation model and presented in the form of concept map. The results of the study indicate that 1 the determination of community representatives based on the criteria of the impacted communities is not clearly described, 3 suggestions, opinions, and responses to the environmental impact management are not well implemented by the project proponent, 3 implementation of the environmental management of other licensed activities affecting the behavior (4 stakeholders (project proponent, EIA consultants, and EIA appraisal committee do not play their role as mandated in applicable legislation.

  12. Use of the Legal-Institutional Analysis Model to assess hydropower licensing negotiations

    Science.gov (United States)

    Burkardt, N.; Lamb, B.L.; Lamb, B.L.; Garcia de Jalon, D.; Sabaton, C.; Souchon, Y.; Tamai, N.; Robinette, H.R.; Waddle, T.J.; Brinson, A.

    2003-01-01

    In the United States, the Federal Energy Regulatory Commission (FERC) is responsible for issuing or renewing licenses for hydropower projects owned and operated by power companies. During the licensing process, these companies are required to consult with agencies and other parties that are affected by project operating regimes. Typical participants include state and federal fish and wildlife agencies, environmental interest groups, and the FERC. One of the most difficult tasks facing participants is to reach agreement about what kinds of environmental conditions should be placed on license. Researchers at the United States Geological Survey developed a model to analyze the institutional context of natural resource disputes. The Legal-Institutional Analysis Model (LIAM) is a computerized model that allows an analyst to determine the likely behavior of each organization in a conflict. The model also analyzes the types and levels of negotiating power held by each organization. Researchers at the USGS have used the model in several cases involving hydropower license applications. To use the model, they facilitate workshops for stakeholder groups in order to develop a shared understanding of the likely obstacles and opportunities for successful resolution of the issues. This allows a systematic workshop analyses to develop strategies for successful negotiations, because they are able to better understand the negotiation problem and work more effectively with both their allies and their competitors.

  13. 40 CFR 158.210 - Experimental use permit data requirements for product chemistry.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Experimental use permit data requirements for product chemistry. 158.210 Section 158.210 Protection of Environment ENVIRONMENTAL PROTECTION... Experimental use permit data requirements for product chemistry. All product chemistry data, as described in...

  14. 40 CFR 221.1 - Applications for permits.

    Science.gov (United States)

    2010-07-01

    ... of the proposed dumping on the marine environment, navigation, living and non-living marine resource... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Applications for permits. 221.1 Section 221.1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING...

  15. Nebraska withdraws its intent to deny site license

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The state of Nebraska has withdrawn its notice of intent to deny the US Ecology (USE) license application for the proposed low-level radioactive waste disposal site in Boyd County, near Butte, Neb. On October 4, after review of USE's August 27 submittal of a revision to the boundaries of the proposed site, a letter from the state's Department of Health (DOH) and Department of Environmental Quality (DEQ) to John. H. DeOld, the USE project manager for the Central Interstate Compact's proposed LLW site, noted that open-quotes...we are hereby withdrawing the Notice of Intent to Deny License as a moot, and will conduct a substantive review of the reconfigured site for compliance with the applicable regulations.close quotes

  16. Final Environmental Statement related to license renewal and power increase for the National Bureau of Standards Reactor: Docket No. 50-184

    International Nuclear Information System (INIS)

    1982-08-01

    This Final Environmental Statement contains an assessment of the environmental impact associated with renewal of Operating License No. TR-5 for the National Bureau of Standards (NBS) reactor for a period of 20 years at a power level of 20 MW. This reactor is located on the 576-acre NBS site near Gaithersburg in Montgomery County, Maryland, about 20 mi northwest of the center of Washington, DC. The reactor is a high-flux heavy-water-moderated, cooled and reflected test reactor, which first went critical on December 7, 1967. Though the reactor was originally designed for 20-MW operation, it has been operating for 14 years at a maximum authorized power level to 10 MW. Program demand is now great enough to warrant operation at a power level of 20 MW. No additional major changes to the physical plant are required to operate at 20 MW

  17. Resource Conservation and Recovery Act Part B permit application

    International Nuclear Information System (INIS)

    1992-01-01

    This permit application (Vol. 7) for the WIPP facility contains appendices related to the following information: Ground water protection; personnel; solid waste management; and memorandums concerning environmental protection standards

  18. The SHP's environmental licensing and the social communication: case study analysis of Funil and Carangola; O licenciamento ambiental de PCH e a comunicacao social: analise dos estudos de caso de Funil e Carangola

    Energy Technology Data Exchange (ETDEWEB)

    Galhardo, Camila Rocha

    2007-07-01

    Lately, concepts and paradigms have gone through constant alterations, due to high-speed growth the globe faces the dilemma of how to keep this growing and guarantee the survival conditions for next generations. Consequently, it comes into view the requirement for the discussion towards environment preservation and sustainability. In addition to this, humanity has been seeking for solutions to this impasse and the Brazilian Electric Sector equally has looked for alternatives since the beginning of electrification in the country, in early 19{sup th} Century, when the first Small Hydropower Plants (SHPs) were installed to provide energy to the industrial development period. Moreover, at present, this same category of energy generation plant represents a good opportunity, for the reason that they are framed as one of the sources of energy that is considered renewable or less pollutant. In the past years, technological evolution has been accompanied by the national industry of equipment and also the environmental legislation has created tools to mitigate the impacts of a Small Hydroelectric Plants (SHPs). The present research has aimed not only to present in its bibliographical revision the evolution of SHPs concept associated with the environmental aspects but also the application of techniques of social communication in the environmental license process. Furthermore it has looked for new communicative applicable tools in search of a larger public participation among the involved players, which results in important premises for the sustainability course of action. In order to attend those goals, two processes of SHP licensing were analyzed in Minas Gerais State, with main focus in the included Social Communication Program in the Plan of Environmental Control foreseen by the resolution number 006/87 of CONAMA (National Environmental Council). Finally, this research intended to present communicative feasible tools in the dimensioning of the participating actions in the

  19. Coping with EPA's new petroleum industry storm water permits

    International Nuclear Information System (INIS)

    Veal, S.C.; Whitescarver, J.P.

    1994-01-01

    The United States Environmental Protection Agency has just released for public comment its so-called multi-sector industry specific storm water permit. This permit -- developed in response to the 730 group storm water permit applications submitted in 1992 to EPA -- proposes the establishment of specific runoff sampling and facility design requirements for at least two petroleum industry sectors. This proposed permit establishes specific conditions for the oil and gas extraction section (SIC group 13) and for lubricant manufacturers (SIC 2992). Permit conditions are also established for allied industrial sectors such as the chemical, transportation and asphalt materials industries. By most standards, the proposed permit is much tougher than EPA's baseline general permit for storm water discharges which was released in September of 1992. For example, under the proposal, most industries are required to perform periodic storm water sampling. EPA has also established storm water effluent and performance standards for several industrial categories. This paper will discuss the petroleum industry specific conditions of the new permit. The paper will also discuss the results of the industry-wide storm water sampling efforts undertaken by more than 300 oil patch facilities across the country. In particular, sampling results will be discussed in the context to the permit conditions proposed by EPA. The paper will also discuss strategies for dealing with the new permits

  20. Fuel Receiving and Storage Station. License application, amendment 4

    International Nuclear Information System (INIS)

    1975-04-01

    Amendment No. 4 of the application for licensing the Barnwell Fuel Processing Plant is presented. Information is included on: the quantity and characteristics of nuclear fuel assemblies which can be received and stored; specifications limiting the outside washdown of contaminated casks received for unloading; and definition of environmental monitoring program. (U.S.)

  1. Environmental analysis burial of offsite low-level waste at SRP

    International Nuclear Information System (INIS)

    Poe, W.L.; Moyer, R.A.

    1980-12-01

    The environmental effects of receipt and burial of low-level naval waste generated at Department of Energy Laboratories are assessed in this environmental analysis. Through 1979, this low-level DOE waste was sent to the NRC-licensed burial ground operated by Chem-Nuclear Systems, Inc., at Barnwell, South Carolina. DOE announced on October 26, 1979, that DOE-generated low-level waste would no longer be buried at commercial waste burial sites. SRP was selected to receive the naval waste described in this analysis. Receipt and burial of these wastes will have a negligible effect on SRP's environment and increase only slightly the environmental effects of the SRP operations discussed in the EIS on SRP waste management operations. The environmental effects of burial of this waste at Chem-Nuclear Burial Ground or at the SRP Burial Ground are described in this environmental analysis to permit assessment of incremental effects caused by the decision to bury this naval waste in the SRP Burial Ground rather than in the Barnwell Burial Ground. The radiological effects from burial of this waste in either the SRP or Chem-Nuclear Burial Ground are very small when compared to those from natural background radiation or to the annual population dose commitment from operation of SRP. The environmental effects of burial at SRP to dose commitments normally received by the population surrounding SRP are compared

  2. Libraries and licensing

    Directory of Open Access Journals (Sweden)

    Maja Žumer

    2001-01-01

    Full Text Available In the mid 90s, the abundance of various electronic publications exposed libraries to the problems of licensing electronic content. Various licensing principles have been prepared recently to help libraries in the process; it can be said that in general, the knowledge of licensing issues has improved in libraries of all types. Libraries form consortia in order to gain stronger negotiating positions and obtain better conditions.In the article, new licensing principles are presented in more detail, as well as some domestic and foreign experiences with consortia forming.

  3. 77 FR 65875 - Adequacy of Arizona Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2012-10-31

    ... Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection Agency (EPA). ACTION: Notice... modification to Arizona's municipal solid waste landfill (MSWLF) permit program to allow the State to issue... amending the municipal solid waste landfill criteria at 40 CFR 258.4 to allow for Research, Development...

  4. 40 CFR 158.270 - Experimental use permit data requirements for residue chemistry.

    Science.gov (United States)

    2010-07-01

    ... requirements for residue chemistry. 158.270 Section 158.270 Protection of Environment ENVIRONMENTAL PROTECTION... Experimental use permit data requirements for residue chemistry. All residue chemistry data, as described in... section 408(r) is sought. Residue chemistry data are not required for an experimental use permit issued on...

  5. Implantation of hydroelectric power plants and the environmental licensing: the importance of the articulation among the electrical and environment sectors in Brazil; A implantacao de usinas hidreletricas e o processo de licenciamento ambiental: a importancia da articulacao entre os setores eletrico e de meio ambiente no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Facuri, Micheline Ferreira

    2004-07-01

    Hydroelectric power plants stand for the main generation source in Brazil. The basis of the national generator park installed capacity is the exploration of hydraulic potency when the Brazilian energetic die is observed. The atmosphere that the Brazilian electric sector is found now asks for new generator units. In this sense, it would decrease energy offer deficit risk, which collaborates to the electric energy offer expansion effort. This research aims to join and to comment on a group of data and information regarding to the process of implantation of hydroelectric power plants already bid. It includes up to date data on hydroelectric power plants bid since 1996. This data describe the main implications found in the enterprises that are late in their schedules. It shows that the greater the environmental management instruments incorporation in hydroelectric projects planning process, the greater the possibility of new hydraulic generation enterprises with better quality of environmental studies implantation. In this way, it makes even better the process of environmental licensing that could occur in a more adequate deadline. As a result, 28 - out of 54 - enterprises bid are found with environmental problems, which represent 43.30% of bestowed potency. It is possible to infer, thus, that there is a need of more interaction between the electric and the environmental sectors. After analyzing the results, it is concluded that the generation enterprises environmental licensing has been worrying the electric sector agents. This happens due to the need of refinement on environmental studies or due to the need of bureaucracy to get licenses - mainly regarding to judicial actions and environmental issues. Finally, the adequate identification of environmental licensing drags allows a more efficient process to hydroelectric power plants implantation, which generates more consistent and faster results. (author)

  6. 40 CFR 51.850 - Prohibition.

    Science.gov (United States)

    2010-07-01

    ... engage in, support in any way or provide financial assistance for, license or permit, or approve any... Federal actions where either: (1) A National Environmental Policy Act (NEPA) analysis was completed as evidenced by a final environmental assessment (EA), environmental impact statement (EIS), or finding of no...

  7. Applying tradable permits to biodiversity conservation: A conceptual analysis of trading rules

    OpenAIRE

    Wissel, Silvia; Wätzold, Frank

    2008-01-01

    Tradable permits have already been applied in many areas of environmental policy and may be a possible response to increasing calls for flexible conservation instruments which are able to successfully conserve biodiversity while allowing for economic development. The idea behind applying tradable permits to conservation is that developers wishing to turn land to economic purposes, thereby destroying valuable habitat, may only do so if they submit a permit to the conservation agency showing th...

  8. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    International Nuclear Information System (INIS)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993

  9. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

  10. Environmental licensing for the implementation of small hydroelectric power plants: analysis and optimization proposals for Minas Gerais state, Brazil; Licenciamento ambiental para implantacao de pequenas centrais hidreletricas: analise e propostas de otimizacao para Minas Gerais

    Energy Technology Data Exchange (ETDEWEB)

    Pedreira, Adriana Coli [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Programa de Pos-graduacao em Engenharia da Energia], e-mail: adriana@unifei.edu.br; Dupas, Francisco Antonio [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Inst. de Recursos Naturais], e-mail: dupas@unifei.edu.brT

    2004-07-01

    This document presents the legal and institutional aspects of the environmental licensing for the implementation of small hydroelectric power plants (SHPP). Laws and doctrine related to the topic were researched and concluded for Minas Gerais State with the help of a survey with the enterprises and institutions involved in the process to find out the difficulties that influence the delay of the analysis of the SHPP. It also highlights the importance of environmental zoning as a tool of environmental management for the procedure to obtain these licenses. The results show that 80% of the cases, the institutions do not respect the deadlines, 40% of the studies presented by the enterprises are insufficient, 60% there is lack of human resource and technical capacities of the environment institutions, and 80% non-fulfilment of the laws and non-integration of the institutions. Finally, the study concludes that the difficulties to obtain these licenses are based on the facts mentioned which are, the non-integration of the institutions and also, being recent, on the inexperience of the actors involved. Therefore, it is suggested that deadlines should be imposed for the institutions and the enterprises. There should be training, fund raising for the hiring of technicians, fulfillment of the law and above all, transparency in order to supply the electrical energy demand and guarantee the sustainable development. (author)

  11. 40 CFR 122.28 - General permits (applicable to State NPDES programs, see § 123.25).

    Science.gov (United States)

    2010-07-01

    ... ELIMINATION SYSTEM Permit Application and Special NPDES Program Requirements § 122.28 General permits... 40 Protection of Environment 21 2010-07-01 2010-07-01 false General permits (applicable to State NPDES programs, see § 123.25). 122.28 Section 122.28 Protection of Environment ENVIRONMENTAL PROTECTION...

  12. 75 FR 53220 - Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2010-08-31

    ...] Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... approved municipal solid waste landfill (MSWLF) program. The approved modification allows the State to..., and demonstration (RD&D) permits to be issued to certain municipal solid waste landfills by approved...

  13. A quantitative integrated assessment of pollution prevention achieved by integrated pollution prevention control licensing.

    Science.gov (United States)

    Styles, David; O'Brien, Kieran; Jones, Michael B

    2009-11-01

    This paper presents an innovative, quantitative assessment of pollution avoidance attributable to environmental regulation enforced through integrated licensing, using Ireland's pharmaceutical-manufacturing sector as a case study. Emissions data reported by pharmaceutical installations were aggregated into a pollution trend using an Environmental Emissions Index (EEI) based on Lifecycle Assessment methodologies. Complete sectoral emissions data from 2001 to 2007 were extrapolated back to 1995, based on available data. Production volume data were used to derive a sectoral production index, and determine 'no-improvement' emission trends, whilst questionnaire responses from 20 industry representatives were used to quantify the contribution of integrated licensing to emission avoidance relative to these trends. Between 2001 and 2007, there was a 40% absolute reduction in direct pollution from 27 core installations, and 45% pollution avoidance relative to hypothetical 'no-improvement' pollution. It was estimated that environmental regulation avoided 20% of 'no-improvement' pollution, in addition to 25% avoidance under business-as-usual. For specific emissions, avoidance ranged from 14% and 30 kt a(-1) for CO(2) to 88% and 598 t a(-1) for SO(x). Between 1995 and 2007, there was a 59% absolute reduction in direct pollution, and 76% pollution avoidance. Pollution avoidance was dominated by reductions in emissions of VOCs, SO(x) and NO(x) to air, and emissions of heavy metals to water. Pollution avoidance of 35% was attributed to integrated licensing, ranging from between 8% and 2.9 t a(-1) for phosphorus emissions to water to 49% and 3143 t a(-1) for SO(x) emissions to air. Environmental regulation enforced through integrated licensing has been the major driver of substantial pollution avoidance achieved by Ireland's pharmaceutical sector - through emission limit values associated with Best Available Techniques, emissions monitoring and reporting requirements, and

  14. Reactor licensing

    International Nuclear Information System (INIS)

    Harvie, J.D.

    2002-01-01

    This presentation discusses reactor licensing and includes the legislative basis for licensing, other relevant legislation , the purpose of the Nuclear Safety and Control Act, important regulations, regulatory document, policies, and standards. It also discusses the role of the CNSC, its mandate and safety philosophy

  15. Status report on the HFR conversion and re-licensing project

    International Nuclear Information System (INIS)

    Wijtsma, F.G.

    2003-01-01

    In 1999 the HFR license holder (JRC, Petten, the Netherlands) initiated a project to study the conversion of the HFR from HEU to LEU. The first phase of this project consisted of a parametric study to determine the optimum fuel element and control rod design within given boundary conditions such as geometry, density, performance and cycle length. Results of this study are a 22 plates fuel element (550 g 235 U) at a density of 4.8 g.cm -3 and a 17 plates control rod (440 g 235 U). The second phase contains all aspects related to the conversion including a full-scale test irradiation of a prototype LEU element. The actual conversion of the HFR requires a new license. For this reason the re-licensing project has started in 2001. In this context many studies have been performed e.g. Risk Scoping Study, Safety Analyses, TOPA (Technical, Operational, Personnel and Administrative) evaluation. The license application will be based on a new Safety Report and an Environmental Impact Statement and will be submitted to the competent Authorities at the end of October 2003. (author)

  16. Research and development tasks of the basalt waste isolation program, and their relationship to the licensing process

    International Nuclear Information System (INIS)

    Kunkel, W.P.

    1978-06-01

    This document presents a preliminary licensing program and outlines the research and development strategy by which a license will be obtained for the repository. It addresses the base data covering the major areas of investigation and technology which will provide input to the licensing process. Basically, each facet of the program, as described in the plan, will be used as part of the documentation required for the Preliminary and Final Safety Analysis Report (PSAR and FSAR), as well as the Environmental Report

  17. Cogeneration plants in Italy: Licensing aspects

    International Nuclear Information System (INIS)

    Buscaglione, A.

    1991-01-01

    This paper focusses on administrative/bureaucratic problems relative to the licensing of cogeneration plants in Italy. The current stumbling block appears to lie in organizational difficulties relative to the coordination of various Government authorized safety committees responsible for the drafting up of suitable legislation governing cogeneration plant fire safety aspects. The author cites the possible environmental benefits in terms of air pollution abatement that could have been had with the timely start-up of a new 7 MW plant (in Lombardia) still awaiting its go-ahead authorization

  18. EPA Office of Water (OW): Pollutant Discharge Permit Status

    Data.gov (United States)

    U.S. Environmental Protection Agency — U.S. States (Generalized) represents the 50 states and the District of Columbia of the United States joined with data from the NPDES Permit Backlog Report for the...

  19. 76 FR 270 - Alaska: Adequacy of Alaska Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2011-01-04

    ...] Alaska: Adequacy of Alaska Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... approved Municipal Solid Waste Landfill (MSWLF) permit program. The approved modification allows the State..., EPA issued a final rule (69 FR 13242) amending the Municipal Solid Waste Landfill (MSWLF) criteria in...

  20. Group NPDES stormwater permit application: The Conoco experience

    International Nuclear Information System (INIS)

    Holler, J.D.

    1993-01-01

    The US Environmental Protection Agency (USEPA) has reported that stormwater runoff is a major cause of pollution and use impairment to waters of the nation. Diffuse pollution sources (stormwater runoff) are increasingly important as controls for industrial process dischargers. On November 16, 1990 the Federal Clean Water Act National Pollutant Discharge Elimination System (NPDES) rules governing the discharge of stormwater were published (56 FR 40948). These rules potentially affect every type of business enterprise conducting work ''associated with industrial activity.'' Dischargers of stormwater associated with industrial activity ar required to either seek coverage under a federal or state general permit using notice of intent, apply for an individual permit, or apply for a permit through a two-part group application process. Conoco, Inc. Supply and Transportation (S and T) elected the latter alternative to attempt to comply with these new evolving complex, broad-ranging permitting requirements. This paper discusses specific details of S and T's strategy, BMP designs, data acquisition activities, monitoring results, as well as economic impacts on the corporation as a result of storm water permit requirements. S and T operates approximately 170 unique wholly and jointly owned petroleum product storage and transport facilities across the nation. Approximately one-third of these facilities were subject to stormwater permit application requirements

  1. A Regional Multi-permit Market for Ecosystem Services

    Science.gov (United States)

    Bernknopf, R.; Amos, P.; Zhang, E.

    2014-12-01

    Regional cap and trade programs have been in operation since the 1970's to reduce environmental externalities (NOx and SOx emissions) and have been shown to be beneficial. Air quality and water quality limits are enforced through numerous Federal and State laws and regulations while local communities are seeking ways to protect regional green infrastructure and their ecosystems services. Why not combine them in a market approach to reduce many environmental externalities simultaneously? In a multi-permit market program reforestation (land offsets) as part of a nutrient or carbon sequestration trading program would provide a means to reduce agrochemical discharges into streams, rivers, and groundwater. Land conversions also improve the quality and quantity of other environmental externalities such as air pollution. Collocated nonmarket ecosystem services have societal benefits that can expand the crediting system into a multi-permit trading program. At a regional scale it is possible to combine regulation of water quality, air emissions and quality, and habitat conservation and restoration into one program. This research is about the economic feasibility of a Philadelphia regional multi-permit (cap and trade) program for ecosystem services. Instead of establishing individual markets for ecosystem services, the assumption of the spatial portfolio approach is that it is based on the interdependence of ecosystem functions so that market credits encompasses a range of ecosystem services. Using an existing example the components of the approach are described in terms of scenarios of land portfolios and the calculation of expected return on investment and risk. An experiment in the Schuylkill Watershed will be described for ecosystem services such as nutrients in water and populations of bird species along with Green House Gases. The Philadelphia regional market includes the urban - nonurban economic and environmental interactions and impacts.

  2. Nuclear reactor operator licensing

    International Nuclear Information System (INIS)

    Bursey, R.J.

    1978-01-01

    The Atomic Energy Act of 1954, which was amended in 1974 by the Energy Reorganization Act, established the requirement that individuals who had the responsibility of operating the reactors in nuclear power plants must be licensed. Section 107 of the act states ''the Commission shall (1) prescribe uniform conditions for licensing individuals; (2) determine the qualifications of such individuals; and (3) issue licenses to such individuals in such form as the Commission may prescribe.'' The article discusses the types of licenses, the selection and training of individuals, and the administration of the Nuclear Regulatory Commission licensing examinations

  3. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1987-05-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  4. Licensing in an international triopoly

    Science.gov (United States)

    Ferreira, Fernanda A.; Ferreira, Flávio

    2011-12-01

    We study the effects of entry of two foreign firms on domestic welfare in the presence of licensing, when the incumbent is technologically superior to the entrants. We consider two different situations: (i) the cost-reducing innovation is licensed to both entrants; (ii) the cost-reducing innovation is licensed to just one of the entrants. We analyse three kind of license: (lump-sum) fixed-fee; (per-unit) royalty; and two-part tariff, that is a combination of a fixed-fee and a royalty. We prove that a two part tariff is never an optimal licensing scheme for the incumbent. Moreover, (i) when the technology is licensed to the two entrants, the optimal contract consists of a licensing with only output royalty; and (ii) when the technology is licensed to just one of the entrants, the optimal contract consists of a licensing with only a fixed-fee.

  5. Aspectos do licenciamento ambiental da carcinicultura na APA do Delta do Parnaíba Aspects of environmental licensing for carciniculture in EPA of the Delta of Parnaíba River

    Directory of Open Access Journals (Sweden)

    Hamilton Gondim de Alencar Araripe

    2006-12-01

    Full Text Available O presente trabalho tem como foco uma análise do valor do licenciamento ambiental da carcinicultura na APA do Delta do Parnaíba. Realizou-se visitas técnicas a todos empreendimentos instalados até o primeiro semestre de 2004, levantou-se a legislação pertinente, avaliou-se estudos ambientais e relatórios de vistorias técnicas realizadas pelo IBAMA. Concluiu-se que o enquadramento feito pelo IBAMA no processo de licenciamento do que seja área de preservação permanente (APP no manguezal é o ponto crítico para a atividade de carcinicultura.The present research examines the environmental matter in the Environmental Protection Area (EPA of the Delta of the Parnaíba River, focusing on the ambient licensing value. Technical visits to all companies installed in the area until the first semester of 2004 and non-structured interviews were carried out; the existing legislation was raised; and the environmental studies and reports of technical inspections performed by IBAMA were evaluated. The conclusion was that the adjustment made by IBAMA in the ambient licensing process of what is an Area of Permanent Preservation (APP in the mangrove is the critical point to the carciniculture activity.

  6. 14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... Conditions § 431.73 Continuing accuracy of license application; application for modification of license. (a...

  7. 76 FR 48861 - Notice of Issuance of Final Outer Continental Shelf Air Permit for Anadarko Petroleum Corporation

    Science.gov (United States)

    2011-08-09

    ... Continental Shelf Air Permit for Anadarko Petroleum Corporation AGENCY: Environmental Protection Agency (EPA... final Outer Continental Shelf (OCS) air permit for Anadarko Petroleum Corporation (Anadarko). The permit... Petroleum Corporation regarding the project. EPA carefully reviewed each of the comments submitted and...

  8. Licensed Healthcare Facilities

    Data.gov (United States)

    California Natural Resource Agency — The Licensed Healthcare Facilities point layer represents the locations of all healthcare facilities licensed by the State of California, Department of Health...

  9. 2015 Business Licenses

    Data.gov (United States)

    City of Jackson, Mississippi — This data displays all business license information for the year of 2015. This information details license classifications and status. This information will updated...

  10. Teenagers' licensing decisions and their views of licensing policies: a national survey.

    Science.gov (United States)

    Williams, Allan F

    2011-08-01

    One objective was to determine teenage licensing rates on a national basis, interest in early licensure, and reasons for delay. A second objective was to learn teenagers' opinions about licensing policies, important in states considering ways to upgrade their current licensing systems. One thousand three hundred eighty-three 15- to 18-year-olds completed an online survey in November 2010. They were drawn from a nationally representative panel of US households recruited using probability-based sampling. The panel included cell phone-only households, and Internet access was provided to those without it. Weighting procedures were applied so that the study population represented the national US population of 15- to 18-year-olds. Most teens said that they were interested in getting a license as soon as legally possible, but many had not started the process. At 16, teens were about equally divided among those who had not started, those in the learner stage, and those with a restricted or full license. At 18, 62 percent had full licenses; 22 percent had not started. For those old enough to start, lack of a car, costs, parent availability, ability to get around without a car, and being busy with other activities were leading reasons for delay. The majority of teens were not in favor of higher licensing ages. Forty-six percent thought the minimum learner age should be 16; 30 percent thought the full license age should be 18 or older. The majority approved of night (78%) and passenger (57%) restrictions, and 85 and 93 percent endorsed cell phone and texting bans, respectively. When these policies were packaged together in a single law that included an age 16 start, night, passenger, cell phone and texting bans, and a full license at age 18, 74 percent of teens were in favor. Teenagers are not as supportive of strong licensing policies as parents of teens, but there is evidence that they will support comprehensive policies likely to lead to further reductions in teen crash

  11. Environmental license process complexity in natural protected areas: case of OSBAT pipeline operated by TRANSPETRO in the state of Sao Paulo; Complexidade do licenciamento ambiental em areas naturais protegidas: caso do duto OSBAT operado pela TRANSPETRO no estado de Sao Paulo

    Energy Technology Data Exchange (ETDEWEB)

    Alves, Anibal Jose Constantino; Raul, Vanderlei Lourenco; Martini, Andrea Dietrich; Campos, Cleber Lucio dos Santos; Ozorio, Tarcisio Faria; Melo Neto, Joao Evangelista de; Lima, Silvia Ferreira de [PETROBRAS Transporte S. A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    It presents the environmental license process enforced to obtain the Implementation License (LI) of the OSBAT pipeway part substitution, in the Sao Sebastiao city, State of Sao Paulo, with the analyses centered on the several public power instances and on the many special legal protection aspects around the natural area scenarios of the project interference. The license process had the duration of seventeen months, since the LI protocol and its emission. The process had the involvement of several organisms, the main part from the Sistema Nacional de Meio Ambiente - SISNAMA, and represented an interesting experience that can contribute to the agility of other license process of infrastructure works on protected natural areas, which has the incidence of an extensive legislation and activities restriction. (author)

  12. Environmental accounts. Environmentally related taxes, subsidies and emission permits; Miljoerelaterade skatter, subventioner och utslaeppsraetter

    Energy Technology Data Exchange (ETDEWEB)

    Cederlund, Maja; Brolinson, Hanna; Palm, Viveka

    2010-12-15

    Environmental Economic instruments is seen as an important component towards a sustainable society. In Prop. (proposition) 2009/10:155 'Swedish environmental objectives - for a more effective environmental' the Ministry of the Environment says that 'We must therefore work to improve the price signals by internalising external environmental costs and increase the use of economic instruments in environmental policy.' Statistics Sweden have now for the first time quantified the environmental economic instruments, both individually and together. In addition, the results are broken down by industry and for most time series can be presented. The result of this work is presented in this report

  13. Radiopharmaceutical licensing

    International Nuclear Information System (INIS)

    Mather, S.J.

    1992-01-01

    Recent health service legislation, and especially the loss of crown immunity has once again focussed attention on the arrangements for licensing of radiopharmaceuticals. The aim of the article is to describe in general terms the UK licensing system and in particular to provide guidance to those responsible for the supply of radiopharmaceuticals in hospitals. (author)

  14. Permitting of Wind Energy Facilities: A Handbook

    Energy Technology Data Exchange (ETDEWEB)

    NWCC Siting Work Group

    2002-08-01

    This handbook has been written for individuals and groups involved in evaluating wind projects: decision-makers and agency staff at all levels of government, wind developers, interested parties and the public. Its purpose is to help stakeholders make permitting wind facility decisions in a manner which assures necessary environmental protection and responds to public needs.

  15. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1983-10-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  16. The SLOWPOKE licensing model

    Energy Technology Data Exchange (ETDEWEB)

    Snell, V. G.; Takats, F.; Szivos, K.

    1989-08-15

    The SLOWPOKE Energy System (SES-10) is a 10 MW heating reactor that has been developed in Canada. It will be capable of running without a licensed operator in continuous attendance, and will be sited in urban areas. It has forgiving safety characteristics, including transient time-scales of the order of hours. A process called `up-front` licensing has been evolved in Canada to identify, and resolve, regulatory concerns early in the process. Because of the potential market in Hungary for nuclear district heating, a licensing plan has been developed that incorporates Canadian licensing experience, identifies specific Hungarian requirements, and reduces the risk of licensing delays by seeking agreement of all parties at an early stage in the program.

  17. Licensing Process for Nuclear Power Plants in Pakistan and its comparison with other Countries

    International Nuclear Information System (INIS)

    Iqbal, Javed; Choi, Kwang Sik

    2012-01-01

    Pakistan Nuclear Regulatory Authority (PNRA) was established in January 2001 with the promulgation of the Ordinance, No-III of 2001. Pakistan is one of the countries in the world who intend to expand its nuclear power program for energy generation upto 8800 MWe by 2030. Presently, there are two research reactors and three nuclear power plants in operation and two power plants are under various stages of construction which are expected to be in commercial operation in 2016. It is obvious that the primary responsibility of ensuring safety of nuclear power plants (NPPs) operation rests with the Pakistan Atomic Energy Commission (PAEC). However, PNRA's prime mission is to ensure the safe operation of nuclear and radiation facilities, safe use of radioactive sources and protection of the radiation workers, general public and the environment from the harmful hazards of radiation by formulating and implementing effective regulations. Pakistan Nuclear Regulatory Authority issues authorizations for nuclear power plants in three stages i.e. site permit, construction license and operation license after detailed safety review. This paper presents the licensing process for NPPs in Pakistan and its comparison with SSG-12, USA and Finland

  18. License to build

    International Nuclear Information System (INIS)

    Huntelaar, Mark; Vos, Renate de; Roobol, Lars

    2007-01-01

    Full text: A new license under the nuclear power act is applied for at the Dutch Government for the building of a High Active Repackaging Unit (HAVA-VU in Dutch) at NRG in Petten, The Netherlands. This new building is necessary to comply with our nuclear license to dispose of high active nuclear waste at Petten to the intermediate storage facility (COVRA). In the first part of this paper attention is given to the formal procedure followed by the Government, what type of documents are to be submitted, what time frames are followed, how citizen participation is organized, and as final result a new license. In the second part more detailed information is given about the present license renewal needed for the High Active Repackaging Unit

  19. Draft environmental statement. Homestake Mining Company: Homestake Mining Company Pitch Project (Saguache County, Colorado)

    International Nuclear Information System (INIS)

    1978-01-01

    The draft concerns the proposed issuance of approvals, permits, and licenses to the Homestake Mining Company for the implementation of the Pitch Project. The Pitch Project consists of mining and milling operations involving uranium ore deposits located in Gunnison National Forest, Saguache County, Colorado. Mining of uranium ore will take place over an estimated period of 20 years; a mill with a nominal capacity of 544 metric tons per day (600 tons per day) will be constructed and operated as long as ore is available. The waste material (tailings) from the mill, also produced at a rate of about 544 metric tons per day (600 tons per day), will be buried onsite at the head end of a natural valley. The environmental impacts are summarized in sections on the existing environment, applicant's proposed mining and milling operation, environmental effects of accidents, monitoring programs, productivity, commitment of resources, alternatives, and cost-benefit evaluation

  20. PERMITTING LEADERSHIP IN THE UNITED STATES

    International Nuclear Information System (INIS)

    Ken Nemeth

    2002-01-01

    In accordance with the Southern States Energy Board (SSEB) proposal, as incorporated into NETL/DE-FC26-97FT34199, the objective of this agreement is to streamline the environmental technology permitting process site-to-site, state-to-state, and industry-to-industry to achieve remediation and waste processing faster, better and cheaper. SSEB is working with member Governors, legislators and regulators to build consensus on streamlining the permitting process for new and innovative technologies for addressing the legacy of environmental problems from 50 years of weapons research, development and production. This report reviews mechanisms whereby industry consortiums and the Department of Energy (DOE) have been working with State regulators and other officials in technology deployment decisions within the DOE complex. The historic development of relationships with State regulators is reviewed and the current nature of the relationships examined. The report contains observations from internal DOE reviews as well as recommendations from the General Accounting Office (GAO) and other external organizations. The report discusses reorganization initiatives leading up to a DOE Top-to-Bottom review of the Environmental Management (EM) Program and highlights points of consideration for maintaining effective linkages with State regulators. It notes how the proposed changes will place new demands upon the National Energy Technology Laboratory (NETL) and how NETL can leverage its resources by refocusing existing EM efforts specifically to states that have DOE facilities within their borders (host-states). Finally, the report discusses how SSEB's Permitting Leadership in the United States (PLUS) program can provide the foundation for elements of NETL's technical assistance program that are delivered to regulators and other decision- makers in host-states. As a regional compact commission, SSEB provides important direct linkages to regulators and stakeholders who need technical

  1. 40 CFR 144.41 - Minor modifications of permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Minor modifications of permits. 144.41 Section 144.41 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS... responsibility, coverage, and liability between the current and new permittees has been submitted to the Director...

  2. Regulatory aspects of underground disposal of radioactive waste - Danish notes

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    In Denmark, provisions regulating nuclear installations (their licensing, and the disposal of radioactive waste amongst other matters) are contained in an Act of 12 May 1976. This act, however, will only come into force if Denmark decides to implement a nuclear power programme. Under the provisions of this Act, the Minister of the Environment is the licensing authority. He receives recommendations from various bodies, including the Inspectorate of Nuclear Installations, and may impose any conditions thought necessary. Three permits are required - site approval, construction permit, and operation permit - and applications must be accompanied by documentation relevant to environmental and nuclear safety and health aspects. Operation of a nuclear installation may be suspended in cases of urgency. As yet, no detailed safety regulations or guidelines on the disposal of nuclear waste have been issued, but a working party, established by the Environmental Protection Agency, is currently studying the problem. (NEA) [fr

  3. Evaluation of Terminated Nuclear Material Licenses

    International Nuclear Information System (INIS)

    Spencer, K.M.; Zeighami, E.A.

    1999-01-01

    This report presents the results of a six-year project that reviewed material licenses that had been terminated during the period from inception of licensing until approximately late-1994. The material licenses covered in the review project were Part 30, byproduct material licenses; Part 40, source material licenses; and Part 70, special nuclear material licenses. This report describes the methodology developed for the project, summarizes the findings of the license file inventory process, and describes the findings of the reviews or evaluations of the license files. The evaluation identified nuclear material use sites that need review of the licensing material or more direct follow-up of some type. The review process also identified licenses authorized to possess sealed sources for which there was incomplete or missing documentation of the fate of the sources

  4. Draft environmental statement related to the Western Nuclear, Inc. Split Rock Mill (Fremont County, Wyoming)

    International Nuclear Information System (INIS)

    1978-11-01

    The proposed action is the renewal of Source Material License SUA-56 (with amendments) issued to Western Nuclear, Inc. (WNI), for the operation of the Split Rock uranium mill near Jeffrey City and the Green Mountain ion-exchange facility, both in Fremont County, Wyoming. The license also permits possession of material from past operations at four ancillary facilities in the Gas Hills mining area--the Bullrush, Day-Loma, Frazier-Lamac, and Rox sites (Docket No. 40-1162). The Split Rock mill is an acid-leach, ion-exchange and solvent-extraction uranium-ore processing mill with a design capacity of 1540 MT (1700 tons) of ore per day. WNI has proposed by license amendment request to increase the storage capacity of the tailings ponds in order to permit the continuation of present production rates of U 3 O 8 through 1996 using lower-grade ores. Conditions for the protection of the environment include reclamation, tailings, stabilization, archeological survey, monitoring, etc

  5. Contestable Licensing

    OpenAIRE

    Zvika Neeman; Gerhard O. Orosel

    2000-01-01

    We analyze a model of repeated franchise bidding for natural monopoly with contestable licensing - a franchisee halds an (exclusive) license to operate a franchise until another rm offers to pay more for it. In a world where quality is observable but not veri able, the simple regulatory scheme we describe combines market-like incentives with regulatory oversight to generate efficient outcomes.

  6. 'Blocked area' of a citizens' action group in operating plan permit accoding to Mining Law

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-26

    On the question as to whether a citizen's action group, organized in the form of a registered club, has the right to file suit as defined by paragraph 2 of sect. 42 of the rules of administrative courts, in case they bring forward that their right to the reforestation of an estate, ensured by easement, will be affected by a skeleton operating plan permit issued under the mining law. Since the protection of the recreational function of forests is a task the safeguarding of which is solely assigned to bodies of public administration, anyone who has a real right may not claim neighbourly protection under public law in so far. On the relationship between operating plan approval, procedures are according to mining laws and the licensing procedures concerning construction permits.

  7. ENVIRONMENTAL PERMITTING IN ETHIOPIA: NO RESTRAINT ON ...

    African Journals Online (AJOL)

    power, such that potentially polluting businesses cannot open or continue to operate ... For a historical overview of international cooperation to solve environmental problem .... The Green Revolution is the movement of technological advances.

  8. Project 2019 of Garona Nuclear power plant. First project to licensing renew more than 40 years in Spain

    International Nuclear Information System (INIS)

    Fernandez, R. A.; Torralbo, J. R.

    2004-01-01

    NUCLENOR has been developing lifetime management and modernisation activities at Santa Maria de Garona NPP since the end of the 80's and the plant is now in optimum technical conditions to continue in operation beyond its original lifetime planned in the design (40 years). In the USA, the country of origin of the project, a good number of power plants with a similar design, age and history to SMG are in the process of obtaining or have already obtained, a licensing extension of up to 60 years from the NRC. In Spain, the activities required for requesting a long-term operating licensing extension include the Ageing Assessment and Management of the plant systems, structures and components, in accordance with the american regulation 10CFR54, a Radiological Impact Study for the new operating period, and an Analysis of New Legislation, not included in the licensing bases and considered to be important to safety by the CSN. With a view to obtaining a renewal of the current operating permit for the period 2009-2019, NUCLENOR has launched the Proyecto 2019, which extends to technical and licensing aspects, as it involves all the company's personnel. (Author)

  9. The nature table as a means of promoting environmental awareness ...

    African Journals Online (AJOL)

    The nature table as a means of promoting environmental awareness. Anne Curror. Abstract. No Abstract. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT · Creative Commons License This work is licensed under a Creative Commons Attribution 3.0 License.

  10. 77 FR 34093 - License Renewal for Calvert Cliffs Nuclear Power Plant, LLC's

    Science.gov (United States)

    2012-06-08

    ... Nuclear Power Plant, LLC's AGENCY: Nuclear Regulatory Commission. ACTION: Environmental assessment and... Spent Fuel Storage Installation (ISFSI) at the Calvert Cliffs Nuclear Power Plant site near Lusby... Cliffs Nuclear Power Plant, LLC (CCNPP) submitted an application to the NRC to renew NRC License SNM-2505...

  11. Nuclear plant license renewal

    International Nuclear Information System (INIS)

    Gazda, P.A.; Bhatt, P.C.

    1991-01-01

    During the next 10 years, nuclear plant license renewal is expected to become a significant issue. Recent Electric Power Research Institute (EPRI) studies have shown license renewal to be technically and economically feasible. Filing an application for license renewal with the Nuclear Regulatory Commission (NRC) entails verifying that the systems, structures, and components essential for safety will continue to perform their safety functions throughout the license renewal period. This paper discusses the current proposed requirements for this verification and the current industry knowledge regarding age-related degradation of structures. Elements of a license renewal program incorporating NRC requirements and industry knowledge including a schedule are presented. Degradation mechanisms for structural components, their significance to nuclear plant structures, and industry-suggested age-related degradation management options are also reviewed

  12. 76 FR 41528 - Notice of Availability of Environmental Assessment and Finding of No Significant Impact for...

    Science.gov (United States)

    2011-07-14

    ... license renewal. Staff considered the following environmental resource areas in its evaluation: Land use... Protection and Performance Assessment Directorate, Division of Waste Management and Environmental Protection... Environmental Assessment and Finding of No Significant Impact for License Renewal for Uranium One USA Inc...

  13. The environmental communication forum | Goetz | Southern African ...

    African Journals Online (AJOL)

    The establishment, Modus operandi and aims of the Environmental Communicators Forum in the greater Durban area is described. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT · Creative Commons License This work is licensed under a Creative ...

  14. 15 CFR 970.701 - Significant adverse environmental effects.

    Science.gov (United States)

    2010-01-01

    ... under a license of scale-model mining systems which simulate commercial recovery could adversely affect... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES... Service or another Federal agency; (5) Meteorological observations and measurements, including the setting...

  15. Establishing credibility in the environmental models used for safety and licensing calculations in the nuclear industry

    International Nuclear Information System (INIS)

    Davis, P.A.

    1997-01-01

    Models that simulate the transport and behaviour of radionuclides in the environment are used extensively in the nuclear industry for safety and licensing purposes. They are needed to calculate derived release limits for new and operating facilities, to estimate consequences following hypothetical accidents and to help manage a real emergency. But predictions generated for these purposes are essentially meaningless unless they are accompanied by a quantitative estimate of the confidence that can be placed in them. For example, in an emergency where there has been an accidental release of radioactivity to the atmosphere, decisions based on a validated model with small uncertainties would likely be very different from those based on an untested model, or on one with large uncertainties. This paper begins with a discussion of some general methods for establishing the credibility of model predictions. The focus will be on environmental transport models but the principles apply to models of all kinds. Establishing the credibility of a model is not a trivial task, It involves a number of tasks including face validation, verification, experimental validation and sensitivity and uncertainty analyses. The remainder of the paper will present quantitative results relating to the credibility of environmental transport models. Model formation, choice of parameter values and the influence of the user will all be discussed as sources of uncertainty in predictions. The magnitude of uncertainties that must be expected in various applications of the models will be presented. The examples used throughout the paper are drawn largely from recent work carried out in BIOMOVS and VAMP. (DM)

  16. Onshore permitting systems analysis for coal, oil, gas, geothermal and oil shale leases. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-09-01

    The magnitude and complexity of permit processes raises a question as to their impact on the rate and scope of industrial development activity. One particular area where this issue is of concern is in new energy extraction and development activities. The initiation of new energy projects has been a national priority for several years. But, energy projects, because of their potential for creating land disturbances, are subject to many environmental and other regulations. Because of this, the permitting required of energy resource developers is extensive. Within the energy field, a major portion of development activities occurs on federal lands. This is particularly true in the Rocky Mountain states and Alaska where the principal landholder is the federal government. The permitting requirements for federal lands' development differ from those for private lands. This report assesses the impact of permitting processes for energy resource development on federal lands. The permitting processes covered include all of the major environmental, land-use, and safety permits required by agencies of federal and state governments. The lands covered include all federal lands, with emphasis on eight states with major development activities.

  17. Airing Your Dirty Laundry: A Quick Marketable Pollution Permits Game for the Classroom

    Science.gov (United States)

    Caviglia-Harris, Jill L.; Melstrom, Richard T.

    2015-01-01

    In this article, the authors describe a simple classroom game that demonstrates the advantage of tradable emissions permits in regulating environmental pollution. Students take on the role of polluters who must consider the costs of complying with a uniform reduction and a tradable permits program. The class is divided into high-cost polluters and…

  18. Final environmental statement related to the operation of Clinton Power Station, Unit No. 1. Docket No. 50-461

    International Nuclear Information System (INIS)

    1982-05-01

    This final environmental statement contains the second assessment of the environmental impact associated with operation of Clinton Power Station Unit 1 pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, as amended, of the NRC's regulations. This statement examines: the affected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land-use and terrestrial- and aquatic-ecological impacts will be small. Air-quality impacts will also be small. However, steam fog from the station's cooling lake has the potential for reducing visibility over nearby roads and bridges. A fog-monitoring program for roads and ridges near the lake has been recommended. Impacts to historic and prehistoric sites will be negligible. Chemical discharges to Lake Clinton and Salt Creek are expected to have no appreciable impacts on water quality under normal conditions and will be required to meet conditions of the station's NPDES permit. The hydrothermal analyses indicate that under certain meteorological conditions (1-in-50-year drought), the plant would have to be operated at reduced power levels in order to meet the thermal standards established by the Illinois Pollution Control Board Order PCB 81-82. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission line facilties should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. Contentions associated with environmental issues accepted during the operating-license hearing are related to assessment of effects of low-level radiation. The net socioeconomic effects of the project will be beneficial. The action called for is the issuance of an operating license for Unit 1 of Clinton

  19. Challenges of SMR licensing practices

    Energy Technology Data Exchange (ETDEWEB)

    Soderholm, K., E-mail: kristiina.soderholm@fortum.com [Fortum Power, Espoo (Finland)

    2012-12-15

    This paper aims to increase the understanding of high level Nuclear Power Plant (NPP) licensing processes in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their different licensing processes and recent actions in new NPP construction. After discussing their similarities and differences, suitable features for Small Modular Reactor licensing can be emphasized and suggested. Some of the studied licensing processes have elements that are already quite well suited for application to SMRs, but all of these different national processes can benefit from studying and implementing lessons learned from SMR specific licensing needs. The main SMR features to take into account in licensing are standardization of the design, modularity, mass production and serial construction. Modularity can be divided into two different categories: the first category is simply a single unit facility constructed of independently engineered modules (e.g., construction process for Westinghouse AP-1000 NPP) and the second is a facility structure composed of many reactor modules where modules are manufactured in factories and installed into the facility as needed (e.g., NuScale Power SMR design). Short construction schedules will not be fully benefited from if the long licensing process prolongs the commissioning and approach to full-power operation. The focus area of this study is to better understand the possibility of SMR deployment in small nuclear countries, such as Finland, which currently has four operating NPPs. The licensing process needs to be simple and clear to make SMR deployment feasible from an economical point of view. This paper uses public information and interviews with experts to establish the overview of the different licensing processes and their main steps. A high-level comparison of the licensing steps has been carried out. Certain aspects of the aviation industry licensing process have also been studied and certain

  20. 31 CFR 596.306 - License.

    Science.gov (United States)

    2010-07-01

    ... ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.306 License. Except as otherwise specified, the term license means any license or...

  1. Understanding Licensing Behavior

    DEFF Research Database (Denmark)

    Cabaleiro, Goretti; Moreira, Solon; Reichstein, Toke

    The potential for rent dissipation has been argued to be the main cause of firms? licensing out behavior being stifled.However, this aspect has been scarcely studied empirically. We draw on rent dissipation arguments, and hypothesize that firms suffering from the not-invented-here (NIH) syndrome......, firms in competitive product markets, and firms that have incurred substantial sunk cost are associated with lower rates of technology out-licensing. We also posit that sunk costs negatively moderate the relationship between competition in the licensor?s product market, and licensing rate. We test our...

  2. Nuclear power stations licensing

    International Nuclear Information System (INIS)

    Solito, J.

    1978-04-01

    The judicial aspects of nuclear stations licensing are presented. The licensing systems of the United States, Spain, France and Federal Republic of Germany are focused. The decree n 0 60.824 from July 7 sup(th), 1967 and the following legislation which define the systematic and area of competence in nuclear stations licensing are analysed [pt

  3. Final environmental statement related to the Western Nuclear, Inc., Split Rock Uranium Mill (Fremont County, Wyoming)

    International Nuclear Information System (INIS)

    1980-02-01

    The proposed action is the renewal of Source Material License SUA-56 (with amendments) issued to Western Nuclear, Inc. (WNI), for the operation of the Split Rock Uranium Mill near Jeffrey City and the Green Mountain Ion-Exchange Facility, both in Fremont County, Wyoming. The license also permits possession of material from past operations at four ancillary facilities in the Gas Hills mining area - the Bullrush, Day-Loma, Frazier-Lamac, and Rox sites (Docket No. 40-1162). However, although heap leaching operations were previously authorized at Frazier-Lamac, there has never been any processing of material at this site. The Split Rock mill is an acid-leach, ion-exchange and solvent-extraction uranium-ore processing mill with a design capacity of 1540 MT (1700 tons) of ore per day. WNI has proposed by license amendment request to increase the storage capacity of the tailings ponds in order to permit the continuation of present production rates of U 3 O 8 through 1996 using lower-grade ores

  4. Wild Horse 69-kV transmission line environmental assessment

    International Nuclear Information System (INIS)

    1996-12-01

    Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline's pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE's review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest

  5. Wild Horse 69-kV transmission line environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline`s pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE`s review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest.

  6. 77 FR 25717 - Proposed Issuance of a General NPDES Permit for Small Suction Dredging

    Science.gov (United States)

    2012-05-01

    ...) General Permit (IDG-37-0000) to placer mining operations in Idaho for small suction dredges (intake nozzle... ENVIRONMENTAL PROTECTION AGENCY [FRL-9666-1] Proposed Issuance of a General NPDES Permit for Small... certifies ``will not, if promulgated, have a significant economic impact on a substantial number of small...

  7. Hanford facility dangerous waste permit application, general information portion

    International Nuclear Information System (INIS)

    Hays, C.B.

    1998-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report)

  8. Completion of decommissioning: Monitoring for site release and license termination

    International Nuclear Information System (INIS)

    Boing, L.E.

    1997-01-01

    To request termination of a license upon completion of dismantling or decommissioning activities, documenting any residual radioactivity to show that the levels are environmentally acceptable will be necessary. When the regulators approve the decommissioning plan, they establish what the release criteria for the decommissioned site will be at the time of the site release and license termination. The criteria are numeric guidelines for direct radiation in soils and on surfaces. If the regulatory body finds that the measured on-site values are below the guidelines, the site will be acceptable for unrestricted release (no radiological controls or future use). If areas are found above those values, more decontamination or cleanup of these areas may be required unless the regulatory body grants an exemption

  9. Why and how to implement an environmental management system based on ISO 14001 standard

    International Nuclear Information System (INIS)

    Andrei, Veronica; Glodeanu, Florin; Rotaru, Ion

    1999-01-01

    The Ministry of Waters, Forests and Environmental Protection, the national environmental authority, licenses both subsidiaries of our company, Cernavoda Nuclear Power Plant (NPP) and Pitesti Nuclear Fuel Manufacturing Plant. As these nuclear facilities are designed, built and operated at the level of the international standards, the licensing process did not involve any difficulties related to the environmental impact, from technical point of view. Concerning future environmental licences including here those for other future nuclear facilities as Dry Spent Fuel Storage Facility and Unit 2, some changes should be expected for the licensing process. First of all the environmental impact assessment of any other new nuclear facility will have to consider the Unit 1 environmental impact assessment as point of start. One of the most important aspects should be how to demonstrate the conformance with environmental objectives or targets. (authors)

  10. FOSS License Selection and Code Management

    OpenAIRE

    Vescuso, Peter

    2011-01-01

    With nearly 2,000 free and open source software (FLOSS) licenses, software license proliferation¿ can be a major headache for software development organizations trying to speed development through software component reuse, as well as companies redistributing software packages as components of their products. Scope is one problem: from the Free Beer license to the GPL family of licenses to platform-specific licenses such as Apache and Eclipse, the number and variety of licenses make it difficu...

  11. Draft environmental statement: Related to operation of the Edwin I. Hatch Nuclear Plant Unit No. 2, Georgia Power Company: Docket No. 50-366

    International Nuclear Information System (INIS)

    1977-04-01

    The proposed action is the issuance of an operation license to the Georgia Power Company for the startup and operation of the Edwin I. Hatch Nuclear Plant, Unit No. 2 (Docket No. 50-366), located on the Altamaha River in Appling County, approximately 11 miles north from Baxley, Georgia. The information in this Statement represents the second, assessment of the environmental impact associated with the Edwin I. Hatch Nuclear Plant, Unit No. 2, pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51 of the Commission's Regulations. After receipt of an application, in 1970, to construct this plant, the staff carried out a review of impact that would occur during the construction and operation of this plant. That evaluation was issued as a Final Environmental Statement in October 1972. As the result of that environmental review, a safety review, an evaluation by the Advisory Committee on Reactor Safeguards, and a public hearing in Baxley, Georgia and Washington, D.C., the AEC (now NRC) issued a permit in December 1972, for the construction of Unit No. 2 of the Edwin I. Hatch Nuclear Plant. As of February 1977, the construction of Unit No. 2 was 70% complete. With a proposed fuel-loading date of April 1978 for Unit No. 2, the applicant has petitioned for license to operate Unit No. 2 and has submitted (July 1975) the required safety and environmental reports to substantiate this petition. 97 refs., 18 figs., 37 tabs

  12. 40 CFR 146.9 - Criteria for establishing permitting priorities.

    Science.gov (United States)

    2010-07-01

    ....9 Criteria for establishing permitting priorities. In determining priorities for setting times for... priorities. 146.9 Section 146.9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER... (a), (c), (g) or § 144.22(f), the Director shall base these priorities upon consideration of the...

  13. Learning-by-Licensing: How Chinese Firms Benefit From Licensing-In Technologies

    DEFF Research Database (Denmark)

    Wang, Yuandi; Roijakkers, N.; Vanhaverbeke, W.

    2012-01-01

    This paper explores how interfirm variations in their in-licensed technology portfolios influence subsequent innovation performance. Existing studies mainly assume licensed technologies are homogeneously accessible to firms, and a prevailing explanation as to why firms vary in their innovation pe...

  14. Challenges to IPPC-B permitting at LGU in Macedonia

    International Nuclear Information System (INIS)

    Nikolov, Marjan

    2006-01-01

    The debate will soon turn to discussion of the arrangements between the environmental protection administration (both central and local), the LGU and ZELS and businesses in order to implement the Law on environment. Of special importance will be development of environment for IPPC-B permitting at the LGU including all stakeholders. The Ministry of Environment and Physical Planning-MEPP must clarify the interface between the responsibilities of the Environmental Protection Administration and those of the LGU.

  15. Financial qualifications review of applicants for nuclear power plant construction permits

    International Nuclear Information System (INIS)

    Hendrickson, P.L.; Mullen, M.F.; Carr, D.B.

    1988-09-01

    The NRC and its predecessor the AEC have had a regulatory requirement since 1956 that utilities seeking a construction permit for a nuclear power plant be financially qualified to construct and operate the plant. Several amendments to the requirements were made over the years including an attempt in 1982 to drop financial qualification review for electric utilities. This attempt was subsequently found invalid by a federal court. Nevertheless, financial qualification reviews consume significant amounts of NRC staff time and time at Atomic Safety and Licensing Board hearings. The analysis reported in this study was conducted to determine whether there is any empirical evidence of a relationship between a utility's financial health at the time of its construction permits application and the subsequent safety performance of the operating plant. The principal financial measures used to test for this relationship were bond rating, interest coverage ratio, debt/asset ratio, debt/equity ratio, and rate of return on equity. The principal safety measure was the long-term average of the scores assigned the utility in four key areas by the NRC under the Systematic Assessment of Licensee Performance program. The results of the analysis showed no evidence of a relationship between financial health at the time of the construction permit and subsequent safety performance. 7 refs., 16 figs., 4 tabs

  16. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1993-01-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  17. Flexible licensing

    Directory of Open Access Journals (Sweden)

    Martyn Jansen

    2012-07-01

    Full Text Available The case is presented for a more flexible approach to licensing online library resources. Today's distributed education environment creates pressure for UK higher and further education institutions (HEI/FEIs to form partnerships and to develop educational products and roll them out across the globe. Online library resources are a key component of distributed education and yet existing licensing agreements struggle to keep pace with the increasing range of users and purposes for which they are required. This article describes the process of developing a flexible approach to licensing and proposes a new model licence for online library resources which has the adaptability needed in this new global educational landscape. These ideas have been presented and discussed at various workshops across Eduserv's and JISC Collections' higher education and publisher communities, and further consultation is ongoing.

  18. Trends in nuclear licensing

    Energy Technology Data Exchange (ETDEWEB)

    Dalton, N W [Council for Nuclear Safety, Hennopsmeer, Pretoria (South Africa)

    1990-06-01

    The development of nuclear safety and licensing is briefly reviewed in four stages namely: The Formative Period (1946-1959), The Expansive Period (1960-1969), The Mature Period (1970-1979) and the Apprehensive Period (1980-1989). Particular safety issues in the respective periods are highlighted to indicate the changing emphasis of nuclear licensing over the past thirty years or so. Against this background, nuclear licensing. (author)

  19. Trends in nuclear licensing

    International Nuclear Information System (INIS)

    Dalton, N.W.

    1990-01-01

    The development of nuclear safety and licensing is briefly reviewed in four stages namely: The Formative Period (1946-1959), The Expansive Period (1960-1969), The Mature Period (1970-1979) and the Apprehensive Period (1980-1989). Particular safety issues in the respective periods are highlighted to indicate the changing emphasis of nuclear licensing over the past thirty years or so. Against this background, nuclear licensing. (author)

  20. 78 FR 26813 - Request To Amend a License To Import Radioactive Waste

    Science.gov (United States)

    2013-05-08

    ... NUCLEAR REGULATORY COMMISSION Request To Amend a License To Import Radioactive Waste Pursuant to..., 2013, April 23, material (Class to a maximum the licensee name 2013, IW022/03, 11005700. A radioactive total of 5,500 from ``Perma-Fix waste). tons of low- Environmental level waste). Services, Inc.'' to...

  1. Streamlining the license renewal review process

    International Nuclear Information System (INIS)

    Dozier, J.; Lee, S.; Kuo, P.T.

    2001-01-01

    The staff of the NRC has been developing three regulatory guidance documents for license renewal: the Generic Aging Lessons Learned (GALL) report, Standard Review Plan for License Renewal (SRP-LR), and Regulatory Guide (RG) for Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses. These documents are designed to streamline the license renewal review process by providing clear guidance for license renewal applicants and the NRC staff in preparing and reviewing license renewal applications. The GALL report systematically catalogs aging effects on structures and components; identifies the relevant existing plant programs; and evaluates the existing programs against the attributes considered necessary for an aging management program to be acceptable for license renewal. The GALL report also provides guidance for the augmentation of existing plant programs for license renewal. The revised SRP-LR allows an applicant to reference the GALL report to preclude further NRC staff evaluation if the plant's existing programs meet the criteria described in the GALL report. During the review process, the NRC staff will focus primarily on existing programs that should be augmented or new programs developed specifically for license renewal. The Regulatory Guide is expected to endorse the Nuclear Energy Institute (NEI) guideline, NEI 95-10, Revision 2, entitled 'Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule', which provides guidance for preparing a license renewal application. This paper will provide an introduction to the GALL report, SRP-LR, Regulatory Guide, and NEI 95-10 to show how these documents are interrelated and how they will be used to streamline the license renewal review process. This topic will be of interest to domestic power utilities considering license renewal and international ICONE participants seeking state-of-the-art information about license renewal in the United States

  2. 10 CFR 72.34 - Environmental report.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report. 72.34 Section 72.34 Energy NUCLEAR..., and Contents § 72.34 Environmental report. Each application for an ISFSI or MRS license under this part must be accompanied by an Environmental Report which meets the requirements of subpart A of part...

  3. An analysis on the export license criteria for NSG control items in the US and Japan

    International Nuclear Information System (INIS)

    Choi, Young Rok

    1995-06-01

    Korea has taken steps to join the Nuclear Suppliers Group (NSG) which is a major part of the international nuclear export control regime. In this connection, it is an urgent task to build a new Korean nuclear export control system that includes NSG guidelines and control items. In addition, it is necessary to review the developed supplier countries' experience in the field of export control. The main purpose of this study is to analyze how the US and Japan have controlled the items listed in NSG part 1 and 2 guidelines. To this end, various relevant regulations of the US and Japan were studied. Among those regulations, the US Export Administration Regulation, US 10 CFR 110 and 810, and the Japan's Export Administration Order are included. Through the review process, this study identified NSG items which are controlled in the export control systems of the US and Japan. Furthermore, this study summarized and compared the export license criteria that must be satisfied before exporting each NSG item in the two countries. The export license criteria consist of permitted destinations, document requirements, and types of license. The results of this study are expected to contribute to establishing an appropriate Korean nuclear export control system and could be used as references to the practical export licensing policies of the US and Japan. 6 tabs., 13 refs., (Author) .new

  4. An analysis on the export license criteria for NSG control items in the US and Japan

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Young Rok [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-06-01

    Korea has taken steps to join the Nuclear Suppliers Group (NSG) which is a major part of the international nuclear export control regime. In this connection, it is an urgent task to build a new Korean nuclear export control system that includes NSG guidelines and control items. In addition, it is necessary to review the developed supplier countries` experience in the field of export control. The main purpose of this study is to analyze how the US and Japan have controlled the items listed in NSG part 1 and 2 guidelines. To this end, various relevant regulations of the US and Japan were studied. Among those regulations, the US Export Administration Regulation, US 10 CFR 110 and 810, and the Japan`s Export Administration Order are included. Through the review process, this study identified NSG items which are controlled in the export control systems of the US and Japan. Furthermore, this study summarized and compared the export license criteria that must be satisfied before exporting each NSG item in the two countries. The export license criteria consist of permitted destinations, document requirements, and types of license. The results of this study are expected to contribute to establishing an appropriate Korean nuclear export control system and could be used as references to the practical export licensing policies of the US and Japan. 6 tabs., 13 refs., (Author) .new.

  5. Tiering strategic environmental assessment and project environmental impact assessment in highway planning in Sao Paulo, Brazil

    International Nuclear Information System (INIS)

    Sanchez, Luis E.; Silva-Sanchez, Solange S.

    2008-01-01

    Constructing highways in dense urban areas is always a challenge. In Sao Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project, called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult. The agency in charge commissioned a strategic environmental assessment (SEA) of a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing. Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on 'what is strategic' is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval

  6. Methods of Environmental Impact Assessment in Colombia

    Directory of Open Access Journals (Sweden)

    Javier Toro Calderón

    2013-10-01

    Full Text Available The Environmental Impact Assessment (EIA in Colombia constitutes the primary tool for making decisions with respect to projects, works and activities (PWA with potential for significant environmental impacts. In the case of the infrastructure of the PWA, the EIA is mandatory and determines the environmental license (EL for construction and operation. This paper analyzes the methods used to assess the environmental impact of the PWA that have applied for licenses with the Ministry of Environment and Sustainable Development. It was found that the method most frequently used is the qualitative proposal by Conesa, with modifications that reduce the effectiveness of the EIA and favor the subjectivity and bias of the evaluator. Finally a series of recom­mendations to improve the process in the country are proposed.

  7. ENVIRONMENTAL SPECIFICATION REQUIREMENTS

    International Nuclear Information System (INIS)

    TIFFT, S.R.

    2003-01-01

    Through regulations, permitting or binding negotiations, Regulators establish requirements, limits, permit conditions and Notice of Construction (NOC) conditions with which the Office of River Protection (ORP) and the Tank Farm Contractor (TFC) must comply. Operating Specifications are technical limits which are set on a process to prevent injury to personnel, or damage to the facility or environment. The main purpose of this document is to provide specification limits and recovery actions for the TFC Environmental Surveillance Program at the Hanford Site. Specification limits are given for monitoring frequencies and permissible variation of readings from an established baseline or previous reading. The requirements in this document are driven by environmental considerations and data analysis issues, rather than facility design or personnel safety issues. This document is applicable to all single-shell tank (SST) and double-shell tank (DST) waste tanks, and the associated catch tanks and receiver tanks, and transfer systems. This Tank Farm Environmental Specifications Document (ESD) implements environmental-regulatory limits on the configuration and operation of the Hanford Tank Farms facility that have been established by Regulators. This ESD contains specific field operational limits and recovery actions for compliance with airborne effluent regulations and agreements, liquid effluents regulations and agreements, and environmental tank system requirements. The scope of this ESD is limited to conditions that have direct impact on Operations Projects or that Operations/Projects have direct impact upon. This document does not supercede or replace any DOE Orders, regulatory permits, notices of construction, or Regulatory agency agreements binding on the ORP or the TFC. Refer to the appropriate regulation, permit, or NOC for an inclusive listing of requirements

  8. MARSSIM guidelines for non-impacted area identification in support of partial site release prior to license termination

    International Nuclear Information System (INIS)

    Parish, D.

    1999-01-01

    Regulations are in place which allow plants undergoing decommissioning to remove obsolete requirements from their licenses. Large buffer areas to the site boundary, needed for emergency planning purposes during power operation, are not required for permanently defueled facilities. It is important that non-impacted areas be removed from license restrictions as soon as possible post shutdown to allow rapid asset recovery and return the large environmental resources these areas represent to beneficial use. License termination surveys are not required for non-impacted areas in accordance with the guidance of US Nuclear Regulatory Commission (NRC) NUREG-1575 (MARSSIM), and NRC Draft Regulatory Guide DG-4006. Thus, such areas do not fall under the license termination requirements of 10CFR50.82 (US Code of Federal Regulations). This report describes methods of classifying areas as non-impacted in accordance with MARRSIM and other NRC guidance, and the licensing options for release of non-impacted areas prior to license termination. The status of Big Rock Point's efforts toward early release of non-impacted areas also is provided. (author)

  9. Evaluation of the contribution of license renewal of nuclear power plants to fault reduction in the U.S

    International Nuclear Information System (INIS)

    Chiba, Goro

    2008-01-01

    Although nuclear power plants in the U.S. were originally permitted to operate for 40 years, operating periods of many plants have been extended by license renewal for another 20 years. On the other hand, plant life management of nuclear power plants in Japan is carried out assuming long-term operation, and the licensee submits aging technology assessment reports before the plant has been operating commercially for 30 years, and then every ten years thereafter, and receives an evaluation by the authorities. In this paper, trend analysis using the INSS database on faults at nuclear power plants overseas, state of implementation of relevant aging management programs, and the effects of license renewal on preservation activities are examined. It is shown that the aging management program identified that many of the cases of fatigue, FAC, and a closed cycle cooling system have been addressed. As a result of analyzing the fault number for each unit, the number of aging faults trends to decrease after applying for license renewal. Therefore, the U.S. license renewal system is considered to be effective for plant life management, and hence the plant life management in Japan, which is substantially equivalent to the U.S. system, is valid. (author)

  10. 76 FR 10894 - Notice of Issuance of Prevention of Significant Deterioration and Federal Operating Permits to...

    Science.gov (United States)

    2011-02-28

    ... Deterioration and Federal Operating Permits to Grand Casino Hinckley AGENCY: Environmental Protection Agency... Corporate Commission doing business as Grand Casino Hinckley. This permit authorizes Grand Casino Hinckley... owned by Mille Lacs Band Corporate Commission doing business as Grand Casino Hinckley. EPA received an...

  11. Graduated driver licensing and differential deterrence: The effect of license type on intentions to violate road rules.

    Science.gov (United States)

    Poirier, Brigitte; Blais, Etienne; Faubert, Camille

    2018-01-01

    In keeping with the differential deterrence theory, this article assesses the moderating effect of license type on the relationship between social control and intention to violate road rules. More precisely, the article has two objectives: (1) to assess the effect of license type on intentions to infringe road rules; and (2) to pinpoint mechanisms of social control affecting intentions to violate road rules based on one's type of driver license (a restricted license or a full license). This effect is examined among a sample of 392 young drivers in the province of Quebec, Canada. Drivers taking part in the Graduated Driver Licensing (GDL) program have limited demerit points and there is zero tolerance for drinking-and-driving. Propensity score matching techniques were used to assess the effect of the license type on intentions to violate road rules and on various mechanisms of social control. Regression analyses were then conducted to estimate the moderating effect of license type. Average treatment effects from propensity score matching analyses indicate that respondents with a restricted license have lower levels of intention to infringe road rules. While moral commitment and, to a lesser extent, the perceived risk of arrest are both negatively associated with intentions to violate road rules, the license type moderates the relationship between delinquent peers and intentions to violate road rules. The effect of delinquent peers is reduced among respondents with a restricted driver license. Finally, a diminished capability to resist peer pressure could explain the increased crash risk in months following full licensing. Copyright © 2017 Elsevier Ltd. All rights reserved.

  12. Does the seal licensing system in Scotland have a negative impact on seal welfare?

    Directory of Open Access Journals (Sweden)

    Laetitia Nunny

    2016-08-01

    Full Text Available This study examined the licensing system that permits seal shooting in Scotland, which was established under Part 6 Conservation of Seals of the Marine (Scotland Act 2010. Four approaches were used: data were collated and analyzed from both the Scottish Government and Scottish Marine Animal Stranding Scheme; a survey was sent to current license holders and informal interviews were conducted with key stakeholder types. Between February 2011 and the end of October 2015, 1229 gray seals and 275 common seals were reported shot under license to the Scottish Government. The numbers of seals reported as shot has reduced year-on-year since the licensing system was put in place. While some license holders, notably fish farms, were using some non-lethal forms of deterrent to reduce seal-related damage, these were often used alongside seal shooting. Of the seals reported as shot to the Scottish Government, only a small percentage were also reported to the Scottish Marine Animal Stranding Scheme, despite this being a licensing requirement. Only 2.3% of the shot gray seals and 4.5% of the shot common seals were necropsied. There is evidence from these necropsies that some seals had not died instantly or had not been shot in the manner recommended by the Scottish Seal Management Code of Practice. These preliminary results show that more carcasses need to be recovered and necropsied if the welfare implications of current seal shooting practice are to be properly assessed. The current legislation does not specify closed seasons to protect breeding seals and thirty-five per cent of necropsied seals were pregnant gray seals. Seals have also been shot during their lactation periods when pups are dependent on their mothers. This raises significant welfare concerns. The re-introduction of closed seasons specific to each species of seal is recommended along with greater effort to deploy non-lethal methods. Independent assessment of the number of seals being killed

  13. Hanford facility dangerous waste permit application, PUREX storage tunnels

    International Nuclear Information System (INIS)

    Price, S.M.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the PUREX Storage Tunnels permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the PUREX Storage Tunnels permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this PUREX Storage Tunnels permit application documentation is current as of April 1997

  14. Generic licensing issues applicable to Wolsong 3 and 4 licensing review

    International Nuclear Information System (INIS)

    Boyd, Frederick C.

    1994-01-01

    The Wolsong 3 and 4 nuclear power plants are of CANDU type which were designed according to the rules and regulations of the Atomic Energy Control Board (AECB) of Canada. In 1992 AECB staff issued a first formal report (to the AECB Board) on 'generic safety issues affecting power reactors'. This was followed by a second report in 1993. These reports dealt with safety issues associated with Canadian CANDU nuclear power plants that applied to all or several plants and were considered insufficiently resolved. In most cases the concern was lack of certainty in the related safety analyses. The AECB staff report of 1993 identified eight 'generic action items' and six 'long-term research issues', three of which AECB staff have indicated may be moved into the 'action' category. This report, prepared for the Korea Institute of Nuclear Safety (KINS), reviews the background of the AECB 'generic action items' and the three 'long-term research issues' noted above. It also reviews an additional topic - steam line failure outside of containment - which was included in the request from KINS. In all, twelve issues are covered. These background reviews are followed by a discussion of the relevance of each issue to the licensing review (for Construction Permit) of Wolsong 3 and 4 and recommended actions to be taken by KINS

  15. SKB's safety case for a final repository license application

    International Nuclear Information System (INIS)

    Hedin, Allan; Andersson, Johan

    2014-01-01

    The safety assessment SR-Site is a main component in SKB's license application, submitted in March 2011, to construct and operate a final repository for spent nuclear fuel at Forsmark in the municipality of Oesthammar, Sweden. Its role in the application is to demonstrate long-term safety for a repository at Forsmark. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. The principal regulatory acceptance criterion, issued by the Swedish Radiation Safety Authority (SSM), requires that the annual risk of harmful effects after closure not exceed 10 -6 for a representative individual in the group exposed to the greatest risk. SSM's regulations also imply that the assessment time for a repository of this type is one million years after closure. The licence applied for is one in a stepwise series of permits, each requiring a safety report. The next step concerns a permit to start excavation of the repository and requires a preliminary safety assessment report (PSAR) covering both operational and post-closure safety. Later steps include permission to commence trial operation, to commence regular operation and to close the final repository. (authors)

  16. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined licesne.

    Science.gov (United States)

    2010-01-01

    ... storage of spent fuel for the nuclear power plant within the scope of the generic determination in § 51.23..., and 51.73. The contribution of the environmental effects of the uranium fuel cycle activities....71, 51.72, 51.73, and this section. The contribution of the environmental effects of the uranium fuel...

  17. Environmental standard review plans for the environmental review of construction permit applications for nuclear power plants

    International Nuclear Information System (INIS)

    1979-05-01

    Information is presented concerning environmental descriptions; plant description; environmental impacts of construction; environmental impacts of station operation; environmental measurements and monitoring programs; environmental impacts of postulated accidents involving radioactive materials; the need for the plant; alternatives to the project; and evaluation of the proposed action

  18. 22 CFR 96.30 - State licensing.

    Science.gov (United States)

    2010-04-01

    ... Licensing and Corporate Governance § 96.30 State licensing. (a) The agency or person is properly licensed or... person follows applicable State licensing and regulatory requirements in all jurisdictions in which it provides adoption services. (c) If it provides adoption services in a State in which it is not itself...

  19. Final environmental statement for La Crosse Boiling Water Reactor: (Docket No. 50-409)

    International Nuclear Information System (INIS)

    1980-04-01

    A Final Environmental Statement for the Dairyland Power Cooperative for the conversion from a provisional to a full-term operating license for the La Crosse Boiling Water Reactor, located in Vernon County, Wisconsin, has been prepared by the Office of Nuclear Reactor Regulation. This statement provides a summary of environmental impacts and adverse effects of operation of the facility, and a consideration of principal alternatives (including removal of LACBWR from service, alternative cooling methodology, and alternative waste treatment systems). Also included are the comments of federal, state, and local governmental agencies and certain non-governmental organizations on the La Crosse Draft Environmental Statement and staff responses to these comments. After weighing environmental, economic, and technical benefits and liabilities, the staff recommends conversion from a provisional operating license to a full-term operating license, subject to specific environmental protection limitations. An operational monitoring program shall be established as part of the Environmental Technical Specifications. 64 refs., 20 figs., 48 tabs

  20. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  1. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-05-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  2. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-01-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  3. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-03-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  4. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-11-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  5. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-10-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  6. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  7. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-09-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  8. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  9. ENVIRONMENTAL SPECIFICATION REQUIREMENTS

    International Nuclear Information System (INIS)

    TIFFT, S.R.

    2003-01-01

    Through regulations, permitting or binding negotiations, Regulators establish requirements, limits, permit conditions and Notice of Construction (NOC) conditions with which the Office of River Protection (ORP) and the Tank Farm Contractor (TFC) must comply. Operating Specifications are technical limits which are set on a process to prevent injury to personnel, or damage to the facility or environment. The main purpose of this document is to provide specification limits and recovery actions for the TFC Environmental Surveillance Program at the Hanford Site. Specification limits are given for monitoring frequencies and permissible variation of readings from an established baseline or previous reading. The requirements in this document are driven by environmental considerations and data analysis issues, rather than facility design or personnel safety issues. This document is applicable to all SST and DST waste tanks, and the associated catch tanks and receiver tanks, and transfer systems. This Tank Farm ESD implements environmental-regulatory limits on the configuration and operation of the Hanford Tank Farms facility that have been established by Regulators. This ESD contains specific field operational limits and recovery actions for compliance with airborne effluent regulations and agreements, liquid effluents regulations and agreements, and environmental tank system requirements. The scope of this ESD is limited to conditions that have direct impact on Operations/Projects or that Operations/Projects have direct impact upon. This document does not supercede or replace any DOE Orders, regulatory permits, notices of construction, or Regulatory agency agreements binding on the ORP or the TFC. Refer to the appropriate regulation, permit, or NOC for an inclusive listing of requirements

  10. Licensing of MAPLE reactors in Canada

    International Nuclear Information System (INIS)

    Lee, A.G.; Labrie, J.P.; Langman, V.J.

    1999-01-01

    Full text: The Operating Licence for a MAPLE reactor (i.e., a 10 MW(th), pool-type reactor), has been approved by the Atomic Energy Control Board (AECB) on August 16th, 1999. This Operating Licence has been obtained within three years of the initiation of the MDS Nordion Medical Isotopes Reactor (MMIR) project, which entails the design, construction and commissioning of two 10 MW MAPLE reactors at AECL's Chalk River Laboratories. The scope and nature of the information required by the AECB, the licensing process and highlights of the events which led to successfully obtaining the Operating Licence for the MAPLE reactor are discussed. These discussions address all phases of the licensing process (i.e., the environmental assessment in support of siting, the Preliminary Safety Analysis Report, PSAR, in support of design, procurement and construction, the Final Safety Analysis Report, FSAR, in support of commissioning and operations, and the development of suitable quality assurance subprograms for each phase). An overview of some of the unique technical aspects associated with the MAPLE reactors, and how they have been addressed during the licensing process are also provided (e.g., applying CSA N285.0, General Requirements for Pressure-Retaining Systems and Components in CANDU Nuclear Power Plants, to a small, low pressure, low temperature research reactor, confirmation of the performance of the driver fuel via laboratory and/or in-reactor testing, validation of the computer codes used to perform the safety analyses, critical parameter uncertainty assessment, full scale hydraulic testing of the performance of the design, fuel handling, human factors validation, operator training and certification). (author)

  11. Licensing in an International Market

    Science.gov (United States)

    Ferreira, Fernanda A.

    2008-09-01

    We study the effects of entry of a foreign firm on domestic welfare in the presence of licensing, when the entrant is technologically superior to the incumbent. We show that foreign entry increases domestic welfare for sufficiently large technological differences between the firms under both fixed-fee licensing and royalty licensing.

  12. 22 CFR 120.20 - License.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false License. 120.20 Section 120.20 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS PURPOSE AND DEFINITIONS § 120.20 License. License means a document bearing the word “license” issued by the Directorate of Defense Trade...

  13. 48 CFR 227.7203-4 - License rights.

    Science.gov (United States)

    2010-10-01

    ... Software and Computer Software Documentation 227.7203-4 License rights. (a) Grant of license. The... license, under an irrevocable license granted or obtained by the contractor which developed the software... granted to the Government. The scope of a computer software license is generally determined by the source...

  14. Allocation of emission permits with leakage through capital markets

    International Nuclear Information System (INIS)

    Maestad, Ottar

    2007-01-01

    This paper analyses how tradable emission permits should be allocated to firms when capital is internationally mobile. When international environmental problems are attempted solved through uncoordinated policies between countries, it might be desirable for the home country to issue free emission permits in proportion to the use of capital in order to prevent leakage through international capital movements. The desirability of free emission permits will however be reduced if capital also can be employed in a domestic non-polluting sector. In this case, it may even be optimal to tax the use of capital in the polluting sector. It is also shown that it is always optimal to subsidise the use of capital in the polluting sector if the use of labour is taxed at an optimal rate. Finally, leakage does not affect the optimal domestic emission limit as long as appropriate capital subsidies and labour taxes are implementeed. (author)

  15. Current status of construction license of PEFP

    International Nuclear Information System (INIS)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T.

    2012-01-01

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically

  16. Current status of construction license of PEFP

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T. [KAERI, Daejeon (Korea, Republic of)

    2012-10-15

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically.

  17. Technology Licensing and Firm Innovation

    DEFF Research Database (Denmark)

    Moreira, Solon

    acquisition. The findings indicate that technology licensing is positively related to the number of inventions produced by the licensee in the years subsequent to the licensing deal. Subsequently, I investigate the moderating effect that organizational slack and myopia have on this main relationship....... The findings also suggest that high levels of Organizational Slack (available financial resources) strengthen the positive effect of licensing on innovation. However, higher levels of Organizational Myopia (the extent to which a firm draws on its own knowledge) can decrease the main effect of licensing....

  18. 40 CFR 158.2080 - Experimental use permit data requirements-biochemical pesticides.

    Science.gov (United States)

    2010-07-01

    ... requirements-biochemical pesticides. 158.2080 Section 158.2080 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS DATA REQUIREMENTS FOR PESTICIDES Biochemical Pesticides § 158.2080 Experimental use permit data requirements—biochemical pesticides. (a) Sections 158.2081...

  19. 31 CFR 596.309 - Specific license.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.309 Specific license. The term specific license means any license or...

  20. Online driver's license renewal.

    Science.gov (United States)

    2015-09-01

    The Kentucky Department of Vehicle Regulation is exploring the possibility of developing and implementing online : drivers license renewal. The objective of this project was to: 1) evaluate online drivers license and REAL ID renewal : programs ...

  1. Joint stock company memorandum of association and environmental protection

    Directory of Open Access Journals (Sweden)

    Arsić Zoran

    2012-01-01

    Full Text Available Joint stock company memorandum of association and environmental protection 2011 Company Act stipulates that prevailing purpose of enterprise is mandatory element of memorandum of association. Connection between memorandum of association and environmental protection is based on provision that registration or doing certain business may be subject to license granted by relevant body. This is the case with 2009 Waste Management Act which provides for license granted by state authorities for doing one or more activities in waste management.

  2. Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Levine, A.; Young, K.; Witherbee, K.

    2013-10-01

    Permitting is a major component of the geothermal development process. Better coordination across government agencies could reduce uncertainty of the process and the actual time of permitting. This presentation highlights various forms of coordinating permit offices at the state and federal level in the western United States, discusses inefficiencies and mitigation techniques for permitting natural resource projects, analyzes whether various approaches are easily adaptable to utility-scale geothermal development, and addresses advantages and challenges for coordinating permit offices. Key successful strategies identified include: 1. Flexibility in implementing the approach (i.e. less statutory requirements for the approach); 2. Less dependence on a final environmental review for information sharing and permit coordination; 3. State and federal partnerships developed through memorandum of understanding to define roles and share data and/or developer information. A few of the most helpful techniques include: 1. A central point of contact for the developer to ask questions surrounding the project; 2. Pre-application meetings to assist the developer in identifying all of the permits, regulatory approvals, and associated information or data required; 3. A permit schedule or timeline to set expectations for the developer and agencies; 4. Consolidating the public notice, comment, and hearing period into fewer hearings held concurrently.

  3. 31 CFR 596.305 - General license.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.305 General license. The term general license means any license or authorization...

  4. Licensing an assured isolation facility for low-level radioactive waste. Volume 1: Licensing strategy and issues

    International Nuclear Information System (INIS)

    Silverman, D.J.; Bauser, M.A.; Baird, R.D.

    1998-07-01

    This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application

  5. Hanford Facility Dangerous Waste Permit Application, 222-S Laboratory Complex

    International Nuclear Information System (INIS)

    WILLIAMS, J.F.

    2000-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the 222-S Laboratory Complex (this document, DOE/RL-91-27). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the 222-S Laboratory Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this 222-S Laboratory Complex permit application documentation is current as of August 2000

  6. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis

  7. AGING MANAGMENT OF REACTOR COOLANT SYSTEM MECHANICAL COMPONENTS FOR LICENSE RENEWAL

    International Nuclear Information System (INIS)

    SUBUDHI, M.; MORANTE, R.; LEE, A.D.

    2002-01-01

    The reactor coolant system (RCS) mechanical components that require an aging management review for license renewal include the primary loop piping and associated connections to other support systems, reactor vessel, reactor vessel internals, pressurizer. steam generators, reactor coolant pumps, and all other inter-connected piping, pipe fittings, valves, and bolting. All major RCS components are located inside the reactor building. Based on the evaluation findings of recently submitted license renewal applications for pressurized water reactors, this paper presents the plant programs and/or activities proposed by the applicants to manage the effects of aging. These programs and/or activities provide reasonable assurance that the intended function(s) of these mechanical components will be maintained for the period of extended operation. The license renewal application includes identification of RCS subcomponents that are within the scope of license renewal and are vulnerable to age-related degradation when exposed to environmental and operational conditions. determination of the effects of aging on their intended safety functions. and implementation of the aging management programs and/or activities including both current and new programs. Industry-wide operating experience, including generic communication by the NRC, is part of the aging management review for the RCS components. In addition, this paper discusses time-limited aging analyses associated with neutron embrittlement of the reactor vessel beltline region and thermal fatigue

  8. 76 FR 71082 - Strata Energy, Inc., Ross Uranium Recovery Project; New Source Material License Application...

    Science.gov (United States)

    2011-11-16

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 40-9091; NRC-2011-0148] Strata Energy, Inc., Ross Uranium Recovery Project; New Source Material License Application; Notice of Intent To Prepare a... intent to prepare a supplemental environmental impact statement. SUMMARY: Strata Energy, Inc. (Strata...

  9. Managing Licensing in a Market for Technology

    DEFF Research Database (Denmark)

    Arora, Ashish; Rønde, Thomas; Fosfuri, Andrea

    the technology makes licensing decisions—to centralized licensing. The business unit has superior information about licensing opportunities but may not have the appropriate incentives because its rewards depend upon product market performance. If licensing is decentralized, the business unit forgoes valuable...... licensing opportunities since the rewards for licensing are (optimally) weaker than those for product market profits. This distortion is stronger when production-based incentives are more powerful, making centralization more attractive. Growth of technology markets favors centralization and drives higher...

  10. Department of Energy licensing strategy

    International Nuclear Information System (INIS)

    Frei, M.W.

    1984-01-01

    The Department of Energy (DOE) is authorized by the Nuclear Waste Policy Act of 1982 (Act) to site, design, construct, and operate mined geologic repositories for high-level radioactive wastes and is required to obtain licenses from the Nuclear Regulatory Commission (NRC) to achieve that mandate. To this end the DOE has developed a licensing approach which defines program strategies and which will facilitate and ease the licensing process. This paper will discuss the regulatory framework within which the repository program is conducted, the DOE licensing strategy, and the interactions between DOE and NRC in implementing the strategy. A licensing strategy is made necessary by the unique technical nature of the repository. Such a facility has never before been licensed; furthermore, the duration of isolation of waste demanded by the proposed EPA standard will require a degree of reliance on probabilistic performance assessment as proof of compliance that is a first of a kind for any industry. The licensing strategy is also made necessary by the complex interrelationships among the many involved governmental agencies and even within DOE itself, and because these relationships will change with time. Program activities which recognize these relationships are essential for implementing the Act. The guiding principle in this strategy is an overriding commitment to safeguarding public health and safety and to protecting the environment

  11. 15 CFR 970.506 - Environmental effects.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Environmental effects. 970.506 Section... Environmental effects. Before issuing or transferring an exploration license, the Administrator must find that... adverse effect on the quality of the environment, taking into account the analyses and information in any...

  12. Tradeable CO2 emission permits for cost-effective control of global warming

    International Nuclear Information System (INIS)

    Kosobud, R.F.; South, D.W.; Daly, T.A.; Quinn, K.G.

    1991-01-01

    Many current global warming mitigation policy proposals call for large, near-term reductions in CO 2 emissions, thereby entailing high initial carbon emission tax rates or permit prices. This paper claims that these high initial tax rates or permit prices are not cost-effective in achieving the desired degree of climate change control. A cost-effective permit system is proposed and described that, under certain assumptions, would allow markets to optimally lead permit prices along a gradually increasing trajectory over tie. This price path presents the Hotelling result and would ease the abrupt, inefficient, and costly adjustments imposed on the fossil fuel and other industries in current proposals. This finding is demonstrated using the Argonne Model, a linear programming energy- environmental-economic model that allows for intertemporal optimization of consumer energy well-being. 12 refs., 3 figs., 1 tab

  13. 40 CFR 158.2170 - Experimental use permit data requirements-microbial pesticides.

    Science.gov (United States)

    2010-07-01

    ... requirements-microbial pesticides. 158.2170 Section 158.2170 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS DATA REQUIREMENTS FOR PESTICIDES Microbial Pesticides § 158.2170 Experimental use permit data requirements—microbial pesticides. (a) For all microbial pesticides. (1) The...

  14. Application of up-front licensing

    Energy Technology Data Exchange (ETDEWEB)

    Grant, S D [Atomic Energy of Canada Ltd., Saskatoon, SK (Canada); Snell, V G [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1996-12-31

    AECL has been pioneering `up-front` licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs.

  15. Application of up-front licensing

    International Nuclear Information System (INIS)

    Grant, S.D.; Snell, V.G.

    1995-01-01

    AECL has been pioneering 'up-front' licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs

  16. Regulatory systems-based licensing guidance documentation

    International Nuclear Information System (INIS)

    Delligatti, M.S.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) has developed a series of licensing guidance documents based on the regulatory requirements in Part 60 of Title 10 of the Code of Federal Regulations (10 CFR Part 60). This regulatory systems-based approach to licensing guidance documentation relies on the definition of the high-level waste repository in 10 CFR Part 60. A document which is important for the frame-work it gives to other programmatic licensing guidance is the Draft Regulatory Guide open-quotes Format and Content for the License Application for the High-Level Waste Repositoryclose quotes (FCRG). The FCRG describes a format and content acceptable to NRC for a high-level waste repository license application pursuant to the requirements of 10 CFR Part 60. Other licensing guidance documents will be compatible with the FCRG

  17. TANK FARM ENVIRONMENTAL REQUIREMENTS

    International Nuclear Information System (INIS)

    TIFFT, S.R.

    2003-01-01

    Through regulations, permitting or binding negotiations, Regulators establish requirements, limits, permit conditions and Notice of Construction (NOC) conditions with which the Office of River Protection (ORP) and the Tank Farm Contractor (TFC) must comply. Operating Specifications are technical limits which are set on a process to prevent injury to personnel, or damage to the facility or environment, The main purpose of this document is to provide specification limits and recovery actions for the TFC Environmental Surveillance Program at the Hanford Site. Specification limits are given for monitoring frequencies and permissible variation of readings from an established baseline or previous reading. The requirements in this document are driven by environmental considerations and data analysis issues, rather than facility design or personnel safety issues. This document is applicable to all single-shell tank (SST) and double-shell tank (DST) waste tanks, and the associated catch tanks and receiver tanks, and transfer systems. This Tank Farm Environmental Specifications Document (ESD) implements environmental-regulatory limits on the configuration and operation of the Hanford Tank Farms facility that have been established by Regulators. This ESD contains specific field operational limits and recovery actions for compliance with airborne effluent regulations and agreements, liquid effluents regulations and agreements, and environmental tank system requirements. The scope of this ESD is limited to conditions that have direct impact on Operations/Projects or that Operations Projects have direct impact upon. This document does not supercede or replace any Department of Energy (DOE) Orders, regulatory permits, notices of construction, or Regulatory agency agreements binding on the ORP or the TFC. Refer to the appropriate regulation, permit, or Notice of Construction for an inclusive listing of requirements

  18. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Science.gov (United States)

    2010-01-01

    ... environmental effects. 970.702 Section 970.702 Commerce and Foreign Trade Regulations Relating to Commerce and... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an...

  19. 10 CFR 51.81 - Distribution of draft environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...

  20. On the effectiveness of a license scheme for E-waste recycling: The challenge of China and India

    International Nuclear Information System (INIS)

    Shinkuma, Takayoshi; Managi, Shunsuke

    2010-01-01

    It is well known that China and India have been recycling centers of WEEE, especially printed circuit boards, and that serious environmental pollution in these countries has been generated by improper recycling methods. After the governments of China and India banned improper recycling by the informal sector, improper recycling activities spread to other places. Then, these governments changed their policies to one of promoting proper recycling by introducing a scheme, under which E-waste recycling requires a license issued by the government. In this paper, the effectiveness of that license scheme is examined by means of an economic model. It can be shown that the license scheme can work effectively only if disposers of E-waste have a responsibility to sell E-waste to license holders. Our results run counter to the idea that international E-waste trade should be banned and provide an alternative solution to the problem.

  1. Radioisotope thermoelectric generator licensed hardware package and certification tests

    International Nuclear Information System (INIS)

    Goldmann, L.H.; Averette, H.S.

    1994-01-01

    This paper presents the Licensed Hardware package and the Certification Test portions of the Radioisotope Thermoelectric Generator Transportation System. This package has been designed to meet those portions of the Code of Federal Regulations (10 CFR 71) relating to ''Type B'' shipments of radioactive materials. The detailed information for the anticipated license is presented in the safety analysis report for packaging, which is now in process and undergoing necessary reviews. As part of the licensing process, a full-size Certification Test Article unit, which has modifications slightly different than the Licensed Hardware or production shipping units, is used for testing. Dimensional checks of the Certification Test Article were made at the manufacturing facility. Leak testing and drop testing were done at the 300 Area of the US Department of Energy's Hanford Site near Richland, Washington. The hardware includes independent double containments to prevent the environmental spread of 238 Pu, impact limiting devices to protect portions of the package from impacts, and thermal insulation to protect the seal areas from excess heat during accident conditions. The package also features electronic feed-throughs to monitor the Radioisotope Thermoelectric Generator's temperature inside the containment during the shipment cycle. This package is designed to safely dissipate the typical 4500 thermal watts produced in the largest Radioisotope Thermoelectric Generators. The package also contains provisions to ensure leak tightness when radioactive materials, such as a Radioisotope Thermoelectric Generator for the Cassini Mission, planned for 1997 by the National Aeronautics and Space Administration, are being prepared for shipment. These provisions include test ports used in conjunction with helium mass spectrometers to determine seal leakage rates of each containment during the assembly process

  2. Free Software Licenses and Other Free Licenses: Genetic Code of Digital Common Goods

    OpenAIRE

    Marco Ciurcina

    2017-01-01

    This article explores the history and describes the main features of free software licenses and other free licenses in an attempt to shed light on the reasons for their success in promoting individual behaviors converging towards the collective construction of digital commons.

  3. Managing Licensing in a Market for Technology

    DEFF Research Database (Denmark)

    Arora, Ashish; Fosfuri, Andrea; Rønde, Thomas

    2013-01-01

    , we find that interdependency across business units may result in more, not less, decentralization. Furthermore, even though centralization results in less information, centralized licensing deals are larger. Our model conforms to the existing evidence that reports heterogeneity across firms in both......Technology licensing is an important means for companies to extract more value from their intellectual assets. We build a model that helps understand how licensing activity should be organized within large corporations. More specifically, we compare decentralization—where the business unit using...... the technology makes licensing decisions—to centralized licensing. The business unit has superior information about licensing opportunities but may not have the appropriate incentives because its rewards depend on product market performance. If licensing is decentralized, the business unit forgoes valuable...

  4. Final environmental statement related to construction of Midland Plant, Units 1 and 2 (Docket Nos. 50-329 and 50-330)

    International Nuclear Information System (INIS)

    1977-01-01

    This is a Final Detailed Statement on Environmental Considerations associated with construction and operation of Midland Plant Units 1 and 2 at Midland, Michigan, pursuant to a construction permit and operating license which has been applied for by the Consumers Power Company. The application is under review by the US Atomic Energy Commission's Regulatory Staff. The environmental impact, including adverse and beneficial effects, of the Midland Plant includes reassignment of use of about 1100 acres of agricultural and residential land for the cooling pond (the plant buildings are located on industrial zoned land); this resulted in the dislocation of approximately 25 residences and relocation of the Midland County Farm to a newly built structure; the destruction of a maximum of 4400 tons of phytoplankton per year at the intake of makeup water from the Tittabawassee River; and a predicted small increase in fogging effects in the near vicinity of the cooling pond. 34 refs., 19 figs., 26 tabs

  5. Current uranium mill licensing issues

    International Nuclear Information System (INIS)

    Scarano, R.A.

    1977-01-01

    The problems encountered to insure environmentally safe mining and milling of uranium ores are reviewed. Emphasis is placed on the management of tailings resulting from milling operations. It is pointed out that although the concentration of radioactivity in the tailings is relatively low, control measures are necessary because of the large quantities involved and because of the long half-life of the parent radionuclides present. The major concerns with mill tailings are radon release to the atmosphere and isolation of the tailings from the human environment. Since it is anticipated that the amount of tailings created by the year 2000 will be more than an order of magnitude greater than the quantities that have been generated during the past 30 years, it is recommended that all mill tailings storage areas be located remote from public contact and in areas such that disruption and dispersion by natural forces and seepage of toxic materials into ground water systems are reduced to the maximum extent achievable. Technical issues that receive attention during the NRC licensing process for uranium mills and the preparation of environmental impact statements are discussed briefly

  6. 7 CFR 6.28 - Transfer of license.

    Science.gov (United States)

    2010-01-01

    ... Licensing Authority will transfer to such other person the historical, nonhistorical or designated license... escrow with the sole condition for return of escrow being that the Licensing Authority determines that... to whom the historical licenses were issued during the quota year in which the sale or conveyance...

  7. Free Software Licenses and Other Free Licenses: Genetic Code of Digital Common Goods

    Directory of Open Access Journals (Sweden)

    Marco Ciurcina

    2017-06-01

    Full Text Available This article explores the history and describes the main features of free software licenses and other free licenses in an attempt to shed light on the reasons for their success in promoting individual behaviors converging towards the collective construction of digital commons.

  8. Licensing Teachers: Lessons from Other Professions.

    Science.gov (United States)

    Haberman, Martin

    1986-01-01

    The licensing of teachers should be modeled against professions similar to teaching rather than professions like medicine and architecture that are vastly different. Applying similar licensing practices can raise the status of teaching. Ignoring these licensing practices will prevent teachers from functioning as professionals. (MD)

  9. Environmental qualification program for new designs

    International Nuclear Information System (INIS)

    Doerffer, K.

    2007-01-01

    Qualification of nuclear power plant equipment and components important to safety (ITS) is an integral part of the design process. The qualification methodology differs based on the severity of service conditions (operational and ambient), to which the ITS equipment is exposed. In Canada, the licensing requirements for environmental qualification for new designs are governed by the Canadian Standard Association (CSA) standard, N290.13-2005 titled 'Environmental Qualification of Equipment for CANDU Nuclear Power Plants' and the pre-consultation draft, 'Requirements for Design of Nuclear Power Plants'(DRD), issued for trial use by the Canadian Nuclear Safety Commission (CNSC) in March 2005. This paper will describe AECL's current Environmental Qualification program developed to comply with the above licensing requirements as applied to new designs. The focus will be given to qualification of ITS systems structures and components (SSC) to harsh conditions occurring due to the Design Basis Accidents (DBA). (author)

  10. 10 CFR 51.53 - Postconstruction environmental reports.

    Science.gov (United States)

    2010-01-01

    ... renewal of a license to operate a nuclear power plant under part 54 of this chapter shall submit with its... related to the environmental effects of the proposed action and the alternatives. In addition, the... impact statement; supplements to the final environmental impact statement, including supplements prepared...

  11. Licensing of nuclear and radioactive installations in Peru

    International Nuclear Information System (INIS)

    Medina Gironzini, E.

    1987-01-01

    In Peru, the Regulation for Ionizing Radiation Sources is applied, which establishes the norms and procedures to follow in the nuclear and radioactive installations of the country in order to assure their correct operation as concerns to the nuclear safety and radiological protection, allowing the emission of the respective licenses. As for the nuclear facilities, this authorization includes the Previous License, the Construction License and the Operation License (provisional and definitive) and for radioactive facilities and equipment generating ionizing radiations: the Construction License and the Operation License. The personnel also require a license that can be an operator license (as for nuclear reactors) or a supervisor license (for nuclear and radioactive facilities). In spite of the above mentioned regulation and its long enforcement period, less than 10% of radioactive facilities in this country are licensed, due to different problems which will be solved in the medium term. (Author)

  12. The licensing processes influence on nuclear market

    International Nuclear Information System (INIS)

    Locatelli, Giorgio; Mancini, Mauro; Sainati, Tristano; Sallinen, Liisa

    2011-01-01

    The paper deals with the licensing nuclear power plants; it focuses primarily on the licensing process implications into the international nuclear market. Nowadays there are twenty-six countries that are planning to build new nuclear facilities, and thirty-seven where nuclear reactors are proposed; on the other hand, there are mainly ten international reactor vendors. At international level, there are few vendors that have sufficient resources, capabilities and experience to carry out the design and delivering of a nuclear power plant in the international market; On the other hand, the licensing processes are strictly dependent on national law frameworks, and on the nuclear policies. The paper proposes a comparison of six licensing processes (the ones established in Finland, France, Italy, South Korea, USA and UK), and analyzes its main features and implications; the IAEA licensing process is taken as reference point. The objective of the paper is to propose a systemic approach for considering the licensing procedures. The framework proposed enables facilitating the licensing management and inferring the main features of licensing contexts. The paper concludes with a forecast of the nuclear licensing context, especially with respect to the fourth generation of nuclear reactors. (author)

  13. Whom to Choose as License Partner?

    DEFF Research Database (Denmark)

    Laursen, Keld; Reichstein, Toke; Trombini, Giulia

    2013-01-01

    between technology and market forces: if partners are market distant, the likelihood of technology license contractual partnership decreases with partners’ technological distance. Using data on the formation of license partnerships in the global biopharmaceutical industry over the period 1994......This paper investigates the matching of firms on the market for technology. The paper forwards two dimensions along which license formation occurs: technology and product-market. Both sides of the market search for a partner representing potential for high technology synergies to maximize licensing...

  14. Exporting the Canadian licensing program

    International Nuclear Information System (INIS)

    Whelan, D.J.

    1981-06-01

    This paper deals with the problems of an overseas regulatory agency in licensing a Canadian-supplied nuclear plant which is referenced to a plant in Canada. Firstly, the general problems associated with the use of a reference plant are discussed. This is followed by a discussion of specific problems which arise from the licensing practices in Canada. The paper concludes with recommendations to simplify the task of demonstrating the licensability of an overseas CANDU plant

  15. Assessing the environmental sustainability of ethanol from integrated biorefineries.

    Science.gov (United States)

    Falano, Temitope; Jeswani, Harish K; Azapagic, Adisa

    2014-06-01

    This paper considers the life cycle environmental sustainability of ethanol produced in integrated biorefineries together with chemicals and energy. Four types of second-generation feedstocks are considered: wheat straw, forest residue, poplar, and miscanthus. Seven out of 11 environmental impacts from ethanol are negative, including greenhouse gas (GHG) emissions, when the system is credited for the co-products, indicating environmental savings. Ethanol from poplar is the best and straw the worst option for most impacts. Land use change from forest to miscanthus increases the GHG emissions several-fold. For poplar, the effect is opposite: converting grassland to forest reduces the emissions by three-fold. Compared to fossil and first-generation ethanol, ethanol from integrated biorefineries is more sustainable for most impacts, with the exception of wheat straw. Pure ethanol saves up to 87% of GHG emissions compared to petrol per MJ of fuel. However, for the current 5% ethanol-petrol blends, the savings are much smaller (biorefineries to the reduction of GHG emissions will be insignificant. Yet, higher ethanol blends would lead to an increase in some impacts, notably terrestrial and freshwater toxicity as well as eutrophication for some feedstocks. © 2014 The Authors. Biotechnology Journal published by Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim. This is an open access article under the terms of the Creative Commons Attribution License, which permits use, distribution and reproduction in any medium, provided the original work is properly cited.

  16. 7 CFR 6.32 - Globalization of licenses.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Globalization of licenses. 6.32 Section 6.32 Agriculture Office of the Secretary of Agriculture IMPORT QUOTAS AND FEES Dairy Tariff-Rate Import Quota Licensing § 6.32 Globalization of licenses. If the Licensing Authority determines that entries of an article...

  17. 42 CFR 431.710 - Provisional licenses.

    Science.gov (United States)

    2010-10-01

    ... Licensing Nursing Home Administrators § 431.710 Provisional licenses. To fill a position of nursing home... 42 Public Health 4 2010-10-01 2010-10-01 false Provisional licenses. 431.710 Section 431.710 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  18. Product Licenses Database Application

    CERN Document Server

    Tonkovikj, Petar

    2016-01-01

    The goal of this project is to organize and centralize the data about software tools available to CERN employees, as well as provide a system that would simplify the license management process by providing information about the available licenses and their expiry dates. The project development process is consisted of two steps: modeling the products (software tools), product licenses, legal agreements and other data related to these entities in a relational database and developing the front-end user interface so that the user can interact with the database. The result is an ASP.NET MVC web application with interactive views for displaying and managing the data in the underlying database.

  19. Final environmental statement related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2: (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1981-09-01

    The proposed action is the issuance of operating licenses to the Texas Utilities Generating Company for the startup and operation of Units 1 and 2 of the Comanche Peak Steam Electric Station located on Squaw Creek Reservoir in Somervell County, Texas, about 7 km north-northeast of Glen Rose, Texas, and about 65 km southwest of Fort Worth in north-central Texas. The information in this environmental statement represents the second assessment of the environmental impact associated with the Comanche Peak Steam Electric Station pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51 of the Commission's Regulations. After receiving an application to construct this station, the staff carried out a review of impact that would occur during its construction and operation. This evaluation was issued as a Final Environmental Statement -- Construction Phase. After this environmental review, a safety review, an evaluation by the Advisory Committee on Reactor Safeguards, and public hearings in Glen Rose, Texas, the US Atomic Energy Commission (now US Nuclear Regulatory Commission) issued construction permits for the construction of Units 1 and 2 of the Comanche Peak Steam Electric Station. 16 figs., 34 tabs

  20. A new approach to the management of cumulative environmental impacts, the Alberta Oil Sands area

    International Nuclear Information System (INIS)

    Weagle, K.V.

    2002-01-01

    Resource development in the oil sand industry of Northeastern Alberta is enjoying a wave of renewed interest fuelled in part by changes made in the tax and royalty structure for oil sands developments in the province, the development of new technology and the price of oil. Announcements were made of investments totalling approximately 51 billion dollars in the oil sand industry over the next ten years in all deposits. The issue of cumulative environmental effects has been amplified accordingly. In June 2000, an association was formed, the Cumulative Environmental Management Association (CEMA), consisting of stakeholders and based on consensus, with a mandate to address 72 issues related to potential cumulative impacts in the expanded development of the Wood Buffalo Region. Five working groups were formed, as well as three standing committees. To mitigate the cumulative effects, the working groups and standing committees are working on management objectives, management systems and research recommendations. The regulatory bodies receive the recommendations, and the implementation process involves the issuance of permits and licenses. Research and monitoring activities play a vital role in the environmental management system and are part of other current environmental initiatives. Some of the initiatives are managed by the Wood Buffalo Environmental Association, Regional Aquatics Monitoring Program, and the Canadian Oil Sands Network for Research and Development. These organizations touch on topics including air quality monitoring, aquatics monitoring and environmental research. 1 fig

  1. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  2. Environmental Effects of Sediment Transport Alteration and Impacts on Protected Species: Edgartown Tidal Energy Project

    Energy Technology Data Exchange (ETDEWEB)

    Barrett, Stephen B; Schlezinger, David, Ph.D; Cowles, Geoff, Ph.D; Hughes, Patricia; Samimy,; Roland, I; and Terray, E, Ph.D.

    2012-12-29

    anchors. This is the same technology proposed by Ocean Renewable Power Company in the Western Passage and Cobscook Bay near Eastport Maine. The blades rotate in two directions capturing the tides energy both during flood and ebb tides. The turbines will be anchored to the bottom and suspended in the water column. Initial depth of the turbines is expected to be about 25 feet below the surface to avoid impacting navigation while also capturing the strongest currents. The Town of Edgartown was initially granted a Preliminary Permit by the Federal Energy Regulatory Commission (FERC) on March 1, 2008, and has recently received a second permit valid through August 2014. The Preliminary Permit gives Edgartown the exclusive right to apply for a power generation license for power generated from the hydrokinetic energy in the water flowing in this area. Edgartown filed a Draft Pilot License Application with FERC on February 1, 2010 and an Expanded Environmental Notification Form with the Massachusetts Environmental Policy Act (MEPA) Office at the same time. It expects to file a Final License Application in late 2013. Harris Miller Miller & Hanson (HMMH) of Burlington Massachusetts is acting as the Project Manager for the Town of Edgartown and collaborating with other partners of the project including the University of Massachusetts - Dartmouth's Marine Renewable Energy Center and the Massachusetts Clean Energy Center. HMMH was awarded a grant under the Department of Energy's Advanced Water Program to conduct marine science and hydrokinetic site-specific environmental studies for projects actively seeking a FERC License. HMMH, on behalf of the Town, is managing this comprehensive study of the marine environment in Muskeget Channel and potential impacts of the tidal project on indicator species and habitats. The University of Massachusetts School of Marine Science and Technology (SMAST) conducted oceanographic studies of tidal currents, tide level, benthic habitat, and

  3. Site suitability, selection and characterization: Branch technical position--Low-Level Waste Licensing Branch

    International Nuclear Information System (INIS)

    Siefken, D.; Pangburn, G.; Pennifill, R.; Starmer, R.J.

    1982-04-01

    The staff provides an expanded interpretation of the site suitability requirements in the proposed rule 10 CFR Part 61, a description of the anticipated site selection process, and a detailed discussion of the site characterization program needed to support a license application and environmental report. The paper provides early-on guidance to prospective applicants in these three subject areas

  4. Nuclear facilities licensing

    International Nuclear Information System (INIS)

    Carvalho, A.J.M. de.

    1978-01-01

    The need for the adoption of a legal and normative system, defining objectives, pescriptions and the process of nuclear licensing and building of nuclear power plants in Brazil is enphasized. General rules for the development of this system are presented. The Brazilian rules on the matter are discussed. A general view of the German legal system for nuclear power plant licensing and the IAEA recommendations on the subject are finally presented. (A.L.S.L.) [pt

  5. To License or Not to License: An Examination of State Statutes Regarding Private Investigators and Digital Examiners

    Directory of Open Access Journals (Sweden)

    Thomas Lonardo

    2008-09-01

    Full Text Available In this paper the authors examine statutes that regulate, license, and enforce investigative functions in each US state. After identification and review of Private Investigator licensing requirements, the authors find that very few state statutes explicitly differentiate between Private Investigators and Digital Examiners. After contacting all state agencies the authors present a distinct grouping organizing state approaches to professional Digital Examiner licensing. The authors conclude that states must differentiate between Private Investigator and Digital Examiner licensing requirements and oversight.

  6. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1981-08-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  7. 77 FR 71404 - Notice of Intent to License Government-Owned Inventions; Intent to License on a Partially...

    Science.gov (United States)

    2012-11-30

    ... DEPARTMENT OF DEFENSE Department of the Army Notice of Intent to License Government-Owned Inventions; Intent to License on a Partially-Exclusive Basis AGENCY: Department of the Army, DoD. ACTION... by the Secretary of the Army. The US Army Edgewood Chemical Biological Center intends to license...

  8. 76 FR 77996 - Notice of Issuance of Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC.

    Science.gov (United States)

    2011-12-15

    ... Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC. AGENCY: Environmental... 27, 2011, the EPA issued a final Outer Continental Shelf (OCS) air permit for Eni US Operating Inc. (Eni). This permit became effective on November 28, 2011. In addition, the EPA issued a final...

  9. 78 FR 72011 - Interpretation Concerning Involvement of NASA Astronauts During a Licensed Launch or Reentry

    Science.gov (United States)

    2013-12-02

    ..., from engaging in operational functions during an FAA-licensed launch or reentry. NASA noted that all... environmental controls and life support systems.'' NASA also asked the FAA whether NASA's astronauts could... an off-nominal or emergency situation, the NASA astronaut would, much of the time, be using...

  10. 40 CFR 147.2923 - Corrective action for wells authorized by permit.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Corrective action for wells authorized by permit. 147.2923 Section 147.2923 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... knowledge that wells within the zone of endangering influence will not serve as conduits for fluid movement...

  11. Licensing of ''grandfather's'' facilities: Ukrainian experience

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Bogdan, L.; Steinberg, N.

    1995-01-01

    In the former USSR, unlike most countries, radioactive waste management activities including waste disposal needed no license. But after the USSR breakdown the Ukrainian Parliament -- Verkhovna Rada -- invoked the revised Law on Business activities. According to Article 4 of the Law, in order to treat or to dispose radioactive waste every enterprise has to get a special permission or license. In compliance with the Law, the Cabinet of Ministers by its Ordinance of January 13, 1993, authorized the Ukrainian State Committee for Nuclear and Radiation Safety (UkrSCNRS) to issue special permissions or licenses for waste treatment and disposal. And that requirement was valid not only for future activities but also for existing facilities in operation. Taking into account the undergoing legislative process, SCNRS began to develop its licensing process without waiting for the special nuclear laws to be passed. On the basis of the legislation already in effect, first of all the Law on Enterprises (full responsibility of enterprises for their activities) and Law on Business activities (requirement to have a license for special types of activities), the newly formed national regulatory body had to identify all the enterprises that needed to be licensed, to establish relevant procedures, to develop related regulatory documents, to implement these procedures and documents at operating enterprises, and for each case to make a decision concerning feasibility of issuing a license, period of validity and license conditions

  12. Social license to operate: case from brazilian mining industry

    Science.gov (United States)

    Santiago, Ana Lúcia F.; Demajorovic, Jacques; Aledo, Antonio

    2015-04-01

    The approach of the Social License to Operate (SLO) emerges as an important element in academic discussions and business practices related to extractive industries. It appears that in productive activities with great potential to produce economic, social and environmental impacts, conventional approaches based on legal compliance no longer sufficient to legitimize the actions of companies and engagement stakeholders. Studies highlight the need of mining activities receiving a SLO "issued" by companies stakeholders, including society, government, non-governmental organizations, media and communities. However, local communities appears as major stakeholders in governance arrangements, by virtue of its proximity to extractive areas and ability to affect the company's results. Stakeholders with unmet expectations can generate conflicts and risks to the company, the knowledge of these expectations and an awareness of company managers of the importance of Social License to Operate (SLO), can generate strategies and mitigating actions to prevent and or minimize possible conflicts. The concept of SLO arises in engineering extractive industry, when you need to respond to social challenges, beyond the usual environmental challenges, technological and management. According to Franks and Cohen (2012) there is a tendency of engineering sectors, sustainability, environmental, safety and especially in risk mappings, treat the technological issues in a neutral manner, separating the technological research projects of social influences. I want to contribute to the advancement of the debate on stakeholder engagement and adopting as focus on the company's relationship with the community, the aim of this study was to understand how a social project held by one of the largest mining companies in Brazil contributed to the process of SLO. This methodological procedure adopted was a qualitative, descriptive, and exploratory interviews with the communities located in rural areas of direct

  13. Environmentally Regulated Facilities in Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — A unique record for each facility site with an environmental interest by DNR (such as permits). This brings together core environmental information in one place for...

  14. Review process for license renewal applications

    International Nuclear Information System (INIS)

    Craig, John W.; Kuo, P.T.

    1991-01-01

    In preparation for license renewal reviews, the Nuclear Regulatory Commission has recently published for public review and comment a proposed rule for license renewal and a draft Standard Review Plan as well as a draft Regulatory Guide relating to the implementation of the proposed rule. In support of future license renewal applications, the nuclear industry has also submitted 11 industry reports for NRC review and approval. This paper briefly describe how these parallel regulatory and industry activities will be factored into the NRC review process for license renewal. (author)

  15. Survey of the authorities competent for licensing and supervision in the field of radiation protection under the terms of the Atomic Energy Act (As of January 1980)

    International Nuclear Information System (INIS)

    1980-01-01

    Contents: 1. Portfolio of the Federal Minister of Defence. 2. Handling of other radioactive substances, equipment for the generation of ionizing radiation and activities in installations owned by third parties: 2.1 Licensing authorities; 2.2 competent authorities for the acception and documentation of notifications required under sections 4, sub-section 1, 17 sub-section 1, of the Radiation Protection Ordinance; 2.3 authorities competent for the registration of radiation records; 2.4 supervisory authorities. 3. Carriage of radioactive substances: 3.1 Federal authorities responsible for licensing and supervisions; 3.2 Land authorities responsible for licensing; 3.3 Land authorities responsible for supervision. 4. Permits concerning the design of equipment. 5. Import and export of radioactive substances: 5.1 Licensing authorities; 5.2 supervisory authorities. 6. Competent authorities in accordance with section 63 sub-section 3 paragraph 1 of the Radiation Protection Ordinance (monitoring stations) and according to the provisions of Land legislation. 7. Licensing and supervisory authorities for the treatment, processing or any other use of nuclear fuels under section 9 of the Atomic Energy Act. 8. Competences of the Laender in the implementation of the Atomic Energy Act and the Radiation Protection Ordinance. (orig.) [de

  16. 10 CFR 781.51 - Nonexclusive licenses.

    Science.gov (United States)

    2010-01-01

    ... corporate structure of which licensee is a part, if any. However, the license shall not be assignable or... license upon the policies of the United States Government; (3) The effect of the license upon domestic and... extent of U.S. Government contribution to the development of the invention; (iv) The degree of...

  17. 7 CFR 6.33 - License fee.

    Science.gov (United States)

    2010-01-01

    ... certified mail, return receipt requested, advising the licensee that if payment is not mailed in accordance.... Where the license at issue is a historical license, this will result, pursuant to § 6.23(b), in the person's loss of historical eligibility for such license. (d) Licensees may elect not to accept certain...

  18. 25 CFR 11.601 - Marriage licenses.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Marriage licenses. 11.601 Section 11.601 Indians BUREAU... ORDER CODE Domestic Relations § 11.601 Marriage licenses. A marriage license shall be issued by the clerk of the court in the absence of any showing that the proposed marriage would be invalid under any...

  19. State Waste Discharge Permit application: 200-W Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  20. State Waste Discharge Permit application: 200-E Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.