WorldWideScience

Sample records for environmental drilling project

  1. Environmental auditing for oil drilling projects

    International Nuclear Information System (INIS)

    Zambrano Solarte, Hugo Ibsen; Olaya Amaya, Alfredo

    2003-01-01

    The enforcement of legal regulations on the environment requires some mechanisms related to preservation and conservation of natural resources, as well as paleontological and archaeological wealth, in order to allow their use without endangering their integrity. This article reviews legal regulations, activities and performance indicators, which should be taken into account by Environmental Auditors in oil projects. Additionally, a Plan for Environmental management is analyzed with its main components and procedures for performing the environmental auditing

  2. Interim report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-02-01

    Concern for the environment and cost reduction are the driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. Preliminary activities included surveying the directional drilling access needs of various DOE sites, identifying an existing class of machinery that could be enhanced for environmental work through development, and establishing a mutually beneficial working relationship with an industry partner. Since that time the project has tested a variety of prototype machinery and hardware built by the industrial partner, and SNL. The project continues to test and develop the machinery and technique refinements needed for future applications at DOE, DOD, and private sector sites. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of ``cut/thrust and compact cuttings without adding large quantities of fluid`` to an environmental problem site. Technology transfer to the private sector is ongoing and ultimately should result in commercial availability of the machinery. Education of regulatory agencies resulting in restructuring appropriate regulatory standards for specification of the horizontal drilling techniques will be a final project goal.

  3. Final report for SNL/NM environmental drilling project

    International Nuclear Information System (INIS)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E.; Layne, R.R.

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of open-quotes cut/thrust and compact cuttings without adding large quantities of fluidclose quotes to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal

  4. Final report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of {open_quotes}cut/thrust and compact cuttings without adding large quantities of fluid{close_quotes} to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal.

  5. Environmental assessment: Uranium Geologic Drilling Project, Winnemucca Dry Lake, Pershing, Nevada

    International Nuclear Information System (INIS)

    This environmental assessment has been prepared to provide the environmental input into the DOE decision to drill and log ten (10) holes of under 7-in. diameters to depths of 100 to 1500 feet in the northern margin of Winnemucca Dry Lake, Pershing County, Nevada, to obtain subsurface information related to uranium favorability

  6. 500,000 Years of Environmental History in Eastern Anatolia: The PALEOVAN Drilling Project

    Directory of Open Access Journals (Sweden)

    Clemens Glombitza, and Jens Kallmeyer

    2012-09-01

    Full Text Available International Continental Scientific Drilling Program (ICDP drilled a complete succession of the lacustrine sediment sequence deposited during the last ~500,000 years in Lake Van, Eastern Anatolia (Turkey. Based on a detailed seismic site survey, two sites at a water depth of up to 360 m were drilled in summer 2010, and cores were retrieved from sub-lake-floor depths of 140 m (Northern Basin and 220 m (Ahlat Ridge. To obtain a complete sedimentary section, the two sites were multiple-cored in order to investigate the paleoclimate history of a sensitive semi-arid region between theBlack, Caspian, and Mediterranean seas. Further scientific goals of the PALEOVAN project are the reconstruction of earthquake activity, as well as the temporal, spatial, and compositional evolution of volcanism as reflected in the deposition of tephra layers. The sediments host organic matter from different sources and hence composition, which will be unravelled using biomarkers. Pathways for migration of continental and mantle-derived noble gases will be analyzed in pore waters. Preliminary 40Ar/39Ar single crystal dating of tephra layers and pollen analyses suggest that the AhlatRidge record encompasses more than half a million years of paleoclimate and volcanic/geodynamic history, providing the longest continental record in the entire Near East to date.

  7. 500.000 years of environmental history in Eastern Anatolia: The PALEOVAN drilling project

    DEFF Research Database (Denmark)

    Litt, Thomas; Anselmetti, Flavio; Baumgarten, Henrike

    2012-01-01

    International Continental Scientific Drilling Program (ICDP) drilled a complete succession of the lacustrine sediment sequence deposited during the last ~500,000 years in Lake Van, Eastern Anatolia (Turkey). Based on a detailed seismic site survey, two sites at a water depth of up to 360 m were...... drilled in summer 2010, and cores were retrieved from sub-lake-floor depths of 140 m (Northern Basin) and 220 m (Ahlat Ridge). To obtain a complete sedimentary section, the two sites were multiple-cored in order to investigate the paleoclimate history of a sensitive semi-arid region between the Black...

  8. Considerations for the Estimation of the Risk of Environmental Contamination Due to Blow Out in Offshore Exploratory Drilling Projects

    International Nuclear Information System (INIS)

    Hurtado, A.; Eguilior, S.; Recreo, F.

    2015-01-01

    From the consideration of a contemporary society based on the need of a high-level complex technology with a high intrinsic level of uncertainty and its relationship with risk assessment, this analysis, conducted in late 2014, was developed from that that led the Secretary of State for the Environment to the Resolution of 29 May 2014, by which the Environmental Impact Statement of the Exploratory Drilling Project in the hydrocarbons research permits called ''Canarias 1-9// was set out and published in the Spanish Official State Gazette number 196 on 13rd August 2014. The aim of the present study is to analyze the suitability with which the worst case associated probability is identified and defined and its relation to the total risk estimate from a blow out. Its interest stems from the fact that all risk management methodologically rests on two pillars, i.e., on a sound risk analysis and evaluation. This determines the selection of management tools in relation to its level of complexity, the project phase and its potential impacts on the health, safety and environmental contamination dimensions.

  9. The environmental and evolutionary history of Lake Ohrid (FYROM/Albania) : Interim results from the SCOPSCO deep drilling project

    NARCIS (Netherlands)

    Wagner, Bernd; Wilke, Thomas; Francke, Alexander; Albrecht, Christian; Baumgarten, Henrike; Bertini, Adele; Combourieu-Nebout, Nathalie; Cvetkoska, Aleksandra|info:eu-repo/dai/nl/413534464; D'Addabbo, Michele; Donders, Timme H.|info:eu-repo/dai/nl/290469872; Föller, Kirstin; Giaccio, Biagio; Grazhdani, Andon; Hauffe, Torsten; Holtvoeth, Jens; Joannin, Sebastien; Jovanovska, Elena; Just, Janna; Kouli, Katerina; Koutsodendris, Andreas; Krastel, Sebastian; Lacey, Jack H.; Leicher, Niklas; Leng, Melanie J.; Levkov, Zlatko; Lindhorst, Katja; Masi, Alessia; Mercuri, Anna Maria; Nomade, Sebastien; Nowaczyk, Norbert; Panagiotopoulos, Konstantinos; Peyron, Odile; Reed, Jane M.; Regattieri, Eleonora; Sadori, Laura; Sagnotti, Leonardo; Stelbrink, Bjöern; Sulpizio, Roberto; Tofilovska, Slavica; Torri, Paola; Vogel, Hendrik; Wagner, Thomas; Wagner-Cremer, Friederike|info:eu-repo/dai/nl/173870783; Wolff, George A.; Wonik, Thomas; Zanchetta, Giovanni; Zhang, Xiaosen S.|info:eu-repo/dai/nl/304835773

    2017-01-01

    This study reviews and synthesises existing information generated within the SCOPSCO (Scientific Collaboration on Past Speciation Conditions in Lake Ohrid) deep drilling project. The four main aims of the project are to infer (i) the age and origin of Lake Ohrid (Former Yugoslav Republic of

  10. The environmental and evolutionary history of Lake Ohrid (FYROM/Albania): interim results from the SCOPSCO deep drilling project

    Science.gov (United States)

    Wagner, Bernd; Wilke, Thomas; Francke, Alexander; Albrecht, Christian; Baumgarten, Henrike; Bertini, Adele; Combourieu-Nebout, Nathalie; Cvetkoska, Aleksandra; D'Addabbo, Michele; Donders, Timme H.; Föller, Kirstin; Giaccio, Biagio; Grazhdani, Andon; Hauffe, Torsten; Holtvoeth, Jens; Joannin, Sebastien; Jovanovska, Elena; Just, Janna; Kouli, Katerina; Koutsodendris, Andreas; Krastel, Sebastian; Lacey, Jack H.; Leicher, Niklas; Leng, Melanie J.; Levkov, Zlatko; Lindhorst, Katja; Masi, Alessia; Mercuri, Anna M.; Nomade, Sebastien; Nowaczyk, Norbert; Panagiotopoulos, Konstantinos; Peyron, Odile; Reed, Jane M.; Regattieri, Eleonora; Sadori, Laura; Sagnotti, Leonardo; Stelbrink, Björn; Sulpizio, Roberto; Tofilovska, Slavica; Torri, Paola; Vogel, Hendrik; Wagner, Thomas; Wagner-Cremer, Friederike; Wolff, George A.; Wonik, Thomas; Zanchetta, Giovanni; Zhang, Xiaosen S.

    2017-04-01

    This study reviews and synthesises existing information generated within the SCOPSCO (Scientific Collaboration on Past Speciation Conditions in Lake Ohrid) deep drilling project. The four main aims of the project are to infer (i) the age and origin of Lake Ohrid (Former Yugoslav Republic of Macedonia/Republic of Albania), (ii) its regional seismotectonic history, (iii) volcanic activity and climate change in the central northern Mediterranean region, and (iv) the influence of major geological events on the evolution of its endemic species. The Ohrid basin formed by transtension during the Miocene, opened during the Pliocene and Pleistocene, and the lake established de novo in the still relatively narrow valley between 1.9 and 1.3 Ma. The lake history is recorded in a 584 m long sediment sequence, which was recovered within the framework of the International Continental Scientific Drilling Program (ICDP) from the central part (DEEP site) of the lake in spring 2013. To date, 54 tephra and cryptotephra horizons have been found in the upper 460 m of this sequence. Tephrochronology and tuning biogeochemical proxy data to orbital parameters revealed that the upper 247.8 m represent the last 637 kyr. The multi-proxy data set covering these 637 kyr indicates long-term variability. Some proxies show a change from generally cooler and wetter to drier and warmer glacial and interglacial periods around 300 ka. Short-term environmental change caused, for example, by tephra deposition or the climatic impact of millennial-scale Dansgaard-Oeschger and Heinrich events are superimposed on the long-term trends. Evolutionary studies on the extant fauna indicate that Lake Ohrid was not a refugial area for regional freshwater animals. This differs from the surrounding catchment, where the mountainous setting with relatively high water availability provided a refuge for temperate and montane trees during the relatively cold and dry glacial periods. Although Lake Ohrid experienced

  11. Field Testing of Environmentally Friendly Drilling System

    Energy Technology Data Exchange (ETDEWEB)

    David Burnett

    2009-05-31

    The Environmentally Friendly Drilling (EFD) program addresses new low-impact technology that reduces the footprint of drilling activities, integrates light weight drilling rigs with reduced emission engine packages, addresses on-site waste management, optimizes the systems to fit the needs of a specific development sites and provides stewardship of the environment. In addition, the program includes industry, the public, environmental organizations, and elected officials in a collaboration that addresses concerns on development of unconventional natural gas resources in environmentally sensitive areas. The EFD program provides the fundamentals to result in greater access, reasonable regulatory controls, lower development cost and reduction of the environmental footprint associated with operations for unconventional natural gas. Industry Sponsors have supported the program with significant financial and technical support. This final report compendium is organized into segments corresponding directly with the DOE approved scope of work for the term 2005-2009 (10 Sections). Each specific project is defined by (a) its goals, (b) its deliverable, and (c) its future direction. A web site has been established that contains all of these detailed engineering reports produced with their efforts. The goals of the project are to (1) identify critical enabling technologies for a prototype low-impact drilling system, (2) test the prototype systems in field laboratories, and (3) demonstrate the advanced technology to show how these practices would benefit the environment.

  12. Economic environmental management of drilling operations

    International Nuclear Information System (INIS)

    Longwell, H.J.; Akers, T.J.

    1992-01-01

    This paper presents significant environmental and regulatory initiatives developed by Exxon's New Orleans Drilling Organization. Specifically, the paper will cover drilling waste minimization techniques and disposal options, recycling of drilling waste streams, and environmentally managed drilling location design considerations. The implementation of some of these initiatives at Exxon's Chalkley field land locations have resulted in a fifty percent reduction in drilling location waste management costs. Some of these same initiatives have been successfully applied to Exxon's barge drilling locations. For operations at the environmentally sensitive Mobile Bay, Exxon contracted with a local company and assisted in the development of an economically and environmentally superior drilling waste disposal and treatment system. In summary, it is possible for drilling operators to pro-actively manage escalating environmental and regulatory challenges through the implementation of economic and practical initiatives

  13. Activity plan: Directional drilling and environmental measurements while drilling

    International Nuclear Information System (INIS)

    Myers, D.A.

    1998-01-01

    This activity plan describes the testing of directional drilling combined with environmental measurements while drilling at two Hanford Site locations. A cold test is to be conducted at the 105A Mock Tank Leak Facility in the 200 East Area. A hot test is proposed to be run at the 216-B-8 tile field north of the 241-B Tank Farm in 200 East Area. Criteria to judge the success, partial success or failure of various aspects of the test are included. The TWRS program is assessing the potential for use of directional drilling because of an identified need to interrogate the vadose zone beneath the single-shell tanks. Because every precaution must be taken to assure that investigation activities do not violate the integrity of the tanks, control of the drill bit and ability to follow a predetermined drill path are of utmost importance and are being tested

  14. Activity plan: Directional drilling and environmental measurements while drilling

    Energy Technology Data Exchange (ETDEWEB)

    Myers, D.A.

    1998-07-16

    This activity plan describes the testing of directional drilling combined with environmental measurements while drilling at two Hanford Site locations. A cold test is to be conducted at the 105A Mock Tank Leak Facility in the 200 East Area. A hot test is proposed to be run at the 216-B-8 tile field north of the 241-B Tank Farm in 200 East Area. Criteria to judge the success, partial success or failure of various aspects of the test are included. The TWRS program is assessing the potential for use of directional drilling because of an identified need to interrogate the vadose zone beneath the single-shell tanks. Because every precaution must be taken to assure that investigation activities do not violate the integrity of the tanks, control of the drill bit and ability to follow a predetermined drill path are of utmost importance and are being tested.

  15. The Marskhod Egyptian Drill Project

    Science.gov (United States)

    Shaltout, M. A. M.

    We describe a possible participation of Egypt in a future Mars rover Mission. It was suggested that Egypt participate through involvement in the design, building and testing of a drill to obtain sub-surface samples. The Space Research Institute of the Russian Academy of Sciences (IKI), formally invited the Egyptian Ministry of Scientific Research to study the concept for potential use on the Russian Mars 2001 Mission. As one of the objectives of the Marskhod mission was the analysis of sub-surface samples, a drilling mechanism in the payload would be essential. The Egyptian expertise in drill development is associated with the archaeological exploration of the Pyramids. A sophisticated drilling system perforated limestone to a depth of 2 m without the use of lubricants or cooling fluids that might have contaminated the Pit's environment. This experience could have been applied to a drill development Mars 2001 mission, which was unfortunately canceled due to economic problems.

  16. 75 FR 48305 - Kaibab National Forest; Arizona; Uranium Exploratory Drilling Project

    Science.gov (United States)

    2010-08-10

    ... Drilling Project AGENCY: Forest Service, USDA. ACTION: Notice; correction. SUMMARY: This is a correction to a notice of intent to prepare an Environmental Impact Statement for the Uranium Exploratory Drilling... Exploratory Drilling Project, 800 S. 6th St., Williams, AZ 86046. Questions may also be submitted by facsimile...

  17. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  18. ResonantSonic drilling: History, progress, and advances in environmental restoration programs

    International Nuclear Information System (INIS)

    Moak, D.J.

    1995-01-01

    ResonantSonic drilling is being used in the environmental industry to drill faster, cheaper, and safer than conventional drilling methodologies. The ResonantSonic drilling method requires no mud, air, or water for rapid penetration through geologic materials ranging from rock and clay to sand and boulders. A specialized drill head imparts high frequency vibrations into steel drill pipe and creates a drilling action which allows the retrieval of continuous, undisturbed cores. An added benefit is that the method can be used for angle drilling. The ResonantSonic method has been used in the past for projects ranging from pile driving to horizontal drilling. Current programs utilize the technique as a valuable tool for obtaining in situ, pristine environmental samples. In the future, this drilling technology could be used for remote, automated sampling at hazardous waste sites

  19. ResonantSonic drilling: History, progress and advances in environmental restoration programs

    International Nuclear Information System (INIS)

    Volk, B.W.; McLellan, G.W.; Moak, D.J.; Lerch, R.E.; Thompson, K.M.; Barrow, J.C.

    1993-01-01

    ResonantSonic SM drilling is being used in the environmental industry to drill faster, cheaper, and safer than conventional drilling methodologies. ResonantSonic is a registered service mark of the Water Development Corporation, Woodland, California. The ResonantSonic drilling method, requires no mud, air or water for rapid penetration through geologic materials ranging from rock and clay to sand and boulders. The specialized drill head imparts high frequency vibrations into a steel drill pipe creating a drilling action which allows the retrieval of continuous, undisturbed cores. An added benefit is that the method can be used for angle drilling. The ReasonantSonic method has been used in the past for projects ranging from pile driving to horizontal drilling. Current programs are utilizing the technique as a valuable tool for obtaining in situ, pristine environmental samples. In the future, this drilling technology could be used for remote, automated sampling at hazardous waste sites

  20. SALTON SEA SCIENTIFIC DRILLING PROJECT: SCIENTIFIC PROGRAM.

    Science.gov (United States)

    Sass, J.H.; Elders, W.A.

    1986-01-01

    The Salton Sea Scientific Drilling Project, was spudded on 24 October 1985, and reached a total depth of 10,564 ft. (3. 2 km) on 17 March 1986. There followed a period of logging, a flow test, and downhole scientific measurements. The scientific goals were integrated smoothly with the engineering and economic objectives of the program and the ideal of 'science driving the drill' in continental scientific drilling projects was achieved in large measure. The principal scientific goals of the project were to study the physical and chemical processes involved in an active, magmatically driven hydrothermal system. To facilitate these studies, high priority was attached to four areas of sample and data collection, namely: (1) core and cuttings, (2) formation fluids, (3) geophysical logging, and (4) downhole physical measurements, particularly temperatures and pressures.

  1. The Newberry Deep Drilling Project (NDDP)

    Science.gov (United States)

    Bonneville, A.; Cladouhos, T. T.; Petty, S.; Schultz, A.; Sorle, C.; Asanuma, H.; Friðleifsson, G. Ó.; Jaupart, C. P.; Moran, S. C.; de Natale, G.

    2017-12-01

    We present the arguments to drill a deep well to the ductile/brittle transition zone (T>400°C) at Newberry Volcano, central Oregon state, U.S.A. The main research goals are related to heat and mass transfer in the crust from the point of view of natural hazards and geothermal energy: enhanced geothermal system (EGS supercritical and beyond-brittle), volcanic hazards, mechanisms of magmatic intrusions, geomechanics close to a magmatic system, calibration of geophysical imaging techniques and drilling in a high temperature environment. Drilling at Newberry will bring additional information to a very promising field of research initiated by ICDP in the Deep Drilling project in Iceland with IDDP-1 on Krafla in 2009, followed by IDDP-2 on the Reykjanes ridge in 2016, and the future Japan Beyond-Brittle project and Krafla Magma Testbed. Newberry Volcano contains one of the largest geothermal heat reservoirs in the western United States, extensively studied for the last 40 years. All the knowledge and experience collected make this an excellent choice for drilling a well that will reach high temperatures at relatively shallow depths (< 5000 m). The large conductive thermal anomaly (320°C at 3000 m depth), has already been well-characterized by extensive drilling and geophysical surveys. This will extend current knowledge from the existing 3000 m deep boreholes at the sites into and through the brittle-ductile transition approaching regions of partial melt like lateral dykes. The important scientific questions that will form the basis of a full drilling proposal, have been addressed during an International Continental Drilling Program (ICDP) workshop held in Bend, Oregon in September 2017. They will be presented and discussed as well as the strategic plan to address them.

  2. Uranium Geologic Drilling Project, Sand Wash Basin, Moffat and Routt Counties, Colorado:

    International Nuclear Information System (INIS)

    1978-01-01

    This environmental assessment of drill holes in Moffat and Routt Counties, Colorado considered the current environment; potential impacts from site preparation, drilling operations, and site restoration; coordination among local, state and federal plans; and consideration of alternative actions for this uranium drilling project

  3. Progress in reducing the environmental impacts of offshore drilling wastes

    International Nuclear Information System (INIS)

    Flemming, D; Candler, J.E.

    2002-01-01

    Full text:Over the past several years, great progress has been made in understanding and reducing the environmental impacts of offshore drilling wastes. Our understanding of sea floor impacts has been helped along by new environmental assessment tools such us computer modeling of sea floor deposition of drilling discharges, sediment profile imaging, and in situ sediment toxicity bioassays. To further reduce environmental impacts, new pollution prevention technologies have been developed that can shrink the environmental footprint of offshore drilling. These technologies reduce the total amount of drilling wastes discharged and include cuttings dryers and centrifuges that can reduce the drilling fluid content of drill cuttings to below 10 percent. In conclusion, the oil and gas industry is adopting more environmentally compatible drilling fluids, new environmental assessment tools and pollution prevention technologies that dramatically reduce the amount of drilling wastes discharged. Together, all of these elements have the potential to reduce environmental impacts of offshore drilling

  4. Case study : environmental considerations of horizontal directional drills

    International Nuclear Information System (INIS)

    Slade, D.A.

    2000-01-01

    A pipeline construction project by Enbridge Pipelines (Toledo) Inc. which relied on horizontal directional drilling (HDD) techniques to install the pipe was analyzed with particular focus on the environmental benefits and risks of using directional drills compared to open cut installation. The construction of the 35-mile, 16-inch crude petroleum pipeline from Stockbridge to Freedom Junction in Michigan involved the use of 11 separate directional drills to cross through wetlands, streams and state recreational areas. The role that HDD played in route selection and environmental permit considerations was discussed along with some of the problems encountered with directional drilling. A successful HDD program must have adequate geotechnical information to properly design and plan the crossings. It was recommended that geotechnical borings should be conducted every 300 to 500 feet across the HDD alignment. It was also recommended that a frac-out contingency plan should be developed and to be prepared for the temporary shut down of the HDD rig if a frac-out occurs. Frac-outs must be investigated, contained and any released fluid should be removed. Some recommendations from past experiences were also presented as a guide for future planning of pipeline projects that include HDD techniques, particularly in wetland areas. Appendix A to this presentation included a contingency plan for illustrative purposes only. The plan was developed for the above project and was included as an example only. It described the planning, prevention and control measures to minimize impacts resulting from inadvertent spill of drilling mud during directional drilling in wetlands. It also included a drilling mud 'Containment, Response and Notification Plan' to be implemented as determined by the contractor under the supervision of Enbridge Pipelines (Toledo) Inc. 5 refs., 2 tabs., 1 fig., 1 appendix

  5. The Hominin Sites and Paleolakes Drilling Project : inferring the environmental context of human evolution from eastern African rift lake deposits

    NARCIS (Netherlands)

    Cohen, A.; Campisano, C.; Arrowsmith, R.; Asrat, A.; Behrensmeyer, A. K.; Deino, A.; Feibel, C.; Hill, A.; Johnson, R.; Kingston, J.; Lamb, H.; Lowenstein, T.; Noren, A.; Olago, D.; Owen, R. B.; Potts, R.; Reed, K.; Renaut, R.; Schäbitz, F.; Tiercelin, J.-J.; Trauth, M. H.; Wynn, J.; Ivory, S.; Brady, K.; O'Grady, R.; Rodysill, J.; Githiri, J.; Russell, J.; Foerster, V.; Dommain, R.; Rucina, S.; Deocampo, D.; Russell, J.; Billingsley, A.; Beck, C.; Dorenbeck, G.; Dullo, L.; Feary, D.; Garello, D.; Gromig, R.; Johnson, T.; Junginger, A.; Karanja, M.; Kimburi, E.; Mbuthia, A.; Mccartney, T.; Mcnulty, E.; Muiruri, V.; Nambiro, E.; Negash, E. W.; Njagi, D.; Wilson, J. N.; Rabideaux, N.; Raub, T.; Sier, M. J.; Smith, P.; Urban, J.; Warren, M.; Yadeta, M.; Yost, C.; Zinaye, B.

    2016-01-01

    The role that climate and environmental history may have played in influencing human evolution has been the focus of considerable interest and controversy among paleoanthropologists for decades. Prior attempts to understand the environmental history side of this equation have centered around the

  6. Environmental issues and solutions for exploratory drilling in sensitive areas

    International Nuclear Information System (INIS)

    Smith, R.M.

    1995-01-01

    Chevron USA Production Company (CPDN), the National Forest Service (FS) and the Bureau of Land Management (BLM) successfully utilized a multi-disciplinary team approach to design and implement innovative environmental solutions to drill the 8,000 foot deep, Hunter Creek exploratory well. The project was located in the Bridger-Teton National Forest, less than 20 miles from Grand Teton National Park. Acquiring permission from the FS, the BLM, and ultimately, the public to drill the Hunter Creek well involved substantial teamwork in identifying many potential, environmental pitfalls. Creative, workable and cost-effective mitigation measures employed at Hunter Creek included: utilizing a helicopter and limiting vehicle use of an existing road, conducting environmental and safety training, an erosion control and reclamation plan, designing an environmentally friendly, near-zero-discharge drilling location, initiating a water quality monitoring program to establish baseline data and to ensure protection of surface and ground water, designing a waste minimization plan, identifying threatened and endangered and special status species possibly affected by project activities, and ensuring compliance with all mitigation measures and Federal and State regulations. The Hunter Creek project successfully demonstrates that oil and gas exploration can be conducted with a soft footprint in environmentally sensitive areas if mitigation measures are front-end loaded in the project and honored by all personnel involved. Teamwork, training and communication were found to be indispensable components of achieving success at Hunter Creek

  7. Environmental assessment of exploration drilling off Nova Scotia: executive summary

    International Nuclear Information System (INIS)

    2000-01-01

    The environmental assessment project of drilling offshore Nova Scotia covers year-around drilling conducted from jackup rigs, semi-submersible rigs, and drill ships that use the methods described in the project description on the Scotian Shelf, the Laurentian Channel and St, Pierre Bank. The assessment was sponsored by all the oil companies active in the area, namely Mobil Oil Canada, Shell Canada, Imperial Oil Resources, Gulf Canada Resources, Chevron Canada Resources, PanCanadian Petroleum, Murphy Oil Company and Norsk Hydro Canada Oil and Gas. This summary describes the impact assessment methodology used, provides a description of the project, reviews the cumulative impact, and the impacts of discrete activities such as noise and disturbances, operational discharges of oil, disruption of the benthos, garbage and waste disposal, and accidental oil spills, and outlines mitigation and monitoring activities to deal with the impacts. Mitigation measures encompass routine discharges, accidental oil spills, spill response, monitoring activities, contingency plans and an overall environmental protection plan. In addition to this generic assessment, the consultants recommend that individual exploration drilling programs that fall outside of the parameters outlined in the generic environmental assessment document, be required to undergo a program-specific assessment that focuses on those aspects of the proposed program that differ from the parameters prescribed in the present document. 9 refs

  8. Environmental Measurement-While-Drilling System and Horizontal Directional Drilling Technology Demonstration, Hanford Site

    International Nuclear Information System (INIS)

    Williams, C.V.; Lockwood, G.J.; Normann, R.A.; Myers, D.A.; Gardner, M.G.; Williamson, T.; Huffman, J.

    1999-01-01

    The Environmental Measurement-While-Drilling (EMWD) system and Horizontal Directional Drilling (HDD) were successfully demonstrated at the Mock Tank Leak Simulation Site and the Drilling Technology Test Site, Hanford, Washington. The use of directional drilling offers an alternative to vertical drilling site characterization. Directional drilling can develop a borehole under a structure, such as a waste tank, from an angled entry and leveling off to horizontal at the desired depth. The EMWD system represents an innovative blend of new and existing technology that provides the capability of producing real-time environmental and drill bit data during drilling operations. The technology demonstration consisted of the development of one borehole under a mock waste tank at a depth of approximately minus8 m (minus27 ft.), following a predetermined drill path, tracking the drill path to within a radius of approximately1.5 m (5 ft.), and monitoring for zones of radiological activity using the EMWD system. The purpose of the second borehole was to demonstrate the capability of drilling to a depth of ∼ -21 m (-70 ft.), the depth needed to obtain access under the Hanford waste tanks, and continue drilling horizontally. This report presents information on the HDD and EMWD technologies, demonstration design, results of the demonstrations, and lessons learned

  9. COST ESTIMATING RELATIONSHIPS IN ONSHORE DRILLING PROJECTS

    Directory of Open Access Journals (Sweden)

    Ricardo de Melo e Silva Accioly

    2017-03-01

    Full Text Available Cost estimating relationships (CERs are very important tools in the planning phases of an upstream project. CERs are, in general, multiple regression models developed to estimate the cost of a particular item or scope of a project. They are based in historical data that should pass through a normalization process before fitting a model. In the early phases they are the primary tool for cost estimating. In later phases they are usually used as an estimation validation tool and sometimes for benchmarking purposes. As in any other modeling methodology there are number of important steps to build a model. In this paper the process of building a CER to estimate drilling cost of onshore wells will be addressed.

  10. Relevance of East African Drill Cores to Human Evolution: the Case of the Olorgesailie Drilling Project

    Science.gov (United States)

    Potts, R.

    2016-12-01

    Drill cores reaching the local basement of the East African Rift were obtained in 2012 south of the Olorgesailie Basin, Kenya, 20 km from excavations that document key benchmarks in the origin of Homo sapiens. Sediments totaling 216 m were obtained from two drilling locations representing the past 1 million years. The cores were acquired to build a detailed environmental record spatially associated with the transition from Acheulean to Middle Stone Age technology and extensive turnover in mammalian species. The project seeks precise tests of how climate dynamics and tectonic events were linked with these transitions. Core lithology (A.K. Behrensmeyer), geochronology (A. Deino), diatoms (R.B. Owen), phytoliths (R. Kinyanjui), geochemistry (N. Rabideaux, D. Deocampo), among other indicators, show evidence of strong environmental variability in agreement with predicted high-eccentricity modulation of climate during the evolutionary transitions. Increase in hominin mobility, elaboration of symbolic behavior, and concurrent turnover in mammalian species indicating heightened adaptability to unpredictable ecosystems, point to a direct link between the evolutionary transitions and the landscape dynamics reflected in the Olorgesailie drill cores. For paleoanthropologists and Earth scientists, any link between evolutionary transitions and environmental dynamics requires robust evolutionary datasets pertinent to how selection, extinction, population divergence, and other evolutionary processes were impacted by the dynamics uncovered in drill core studies. Fossil and archeological data offer a rich source of data and of robust environment-evolution explanations that must be integrated into efforts by Earth scientists who seek to examine high-resolution climate records of human evolution. Paleoanthropological examples will illustrate the opportunities that exist for connecting evolutionary benchmarks to the data obtained from drilled African muds. Project members: R. Potts, A

  11. Environmental effects monitoring for exploration drilling

    International Nuclear Information System (INIS)

    Buchanan, R.A.; Cook, J.A.; Mathieu, A.

    2003-01-01

    Strategies for monitoring the environmental effects of single exploratory offshore wells on the east coast of Canada were evaluated. The report was compiled from consultations with scientists, regulators and stakeholders as well as a review of regulatory regimes and toxicity results. The aim of the report was to develop a decision tree for determining when to conduct environmental effects monitoring (EEM). Respondents evinced lower levels of concern for single exploratory wells than for production developments. A number of scientists argued for full statistical treatment of all data, and many people argued that more assurance was needed that the marine environment was not being unduly harmed. Respondents also considered that biological effects should be a primary focus, rather than the occurrence of trace chemical signals, and that seabirds and mammals should be monitored. Concern was expressed over the value of data collected from monitoring the effects of exploratory drilling activities. It was suggested that local and site-specific issues should be considered in the design of EEM programs. Respondents expressed strong concern about potential cumulative effects with other industrial activities, and suggested that test cases should be established and monitored to develop a scientific rationale for the inclusion or exclusion of specific variables in future EEM programs. A decision tree was developed based on 3 scenarios: (1) compliance monitoring only in well known areas with no sensitive issues; opportunistic EEM surveys of sediments, benthos, seabirds and marine mammals in shallow or deep areas with no known sensitive issues; and (3) custom EEM surveys for sensitive areas. Currently, there are EEM requirements for drilling exploratory wells offshore Canada's east coast. 58 refs., 2 tabs., 7 figs

  12. Characterization of Under-Building Contamination at Rocky Flats Implementing Environmental-Measurement While Drilling Process with Horizontal Directional Drilling

    International Nuclear Information System (INIS)

    WILLIAMS, CECELIA V.; LOCKWOOD, GRANT J.; NORMANN, RANDY A.; LINDSAY, THOMAS

    2001-01-01

    Characterization is required on thirty-one buildings at Rocky Flats Environmental Technology Site (RFETS or the Site) with known or suspected under building contamination. The Site has teamed with Sandia National Laboratory (SNL) to deploy Environmental Measure-While-Drilling (EMWD) in conjunction with horizontal directional drilling (HDD) to characterize under building contamination and to evaluate the performance and applicability for future characterization efforts. The Environmental Measurement-While-Drilling-Gamma Ray Spectrometer (EMWD-GRS) system represents an innovative blend of new and existing technology that provides the capability of producing real-time environmental drill bit data during drilling operations. The project investigated two locations, Building 886 and Building 123. Building 886 is currently undergoing D and D activities. Building 123 was demolished in 1998; however, the slab is present with under building process waste lines and utilities. This report presents the results of the EMWD Gamma Ray Spectrometer logging of boreholes at these two sites. No gamma emitting contamination was detected at either location.(author)

  13. Potential environmental benefits from regulatory consideration of synthetic drilling muds

    International Nuclear Information System (INIS)

    Burke, C.J.; Veil, J.A.

    1995-02-01

    When drilling exploration and production wells for oil and gas, drillers use specialized drilling fluids, referred to as muds, to help maintain well control and to remove drill cuttings from the hole. Historically, either water-based muds (WBMs) or oil-based muds (OBMs) have been used for offshore wells. Recently, in response to US Environmental Protection Agency (EPA) regulations and drilling-waste discharge requirements imposed by North Sea nations, the drilling industry has developed several types of synthetic-based muds (SBMs) that combine the desirable operating qualities of OBMs with the lower toxicity and environmental impact qualities of WBMs. This report describes the operational, environmental, and economic features of all three types of muds and discusses potential EPA regulatory barriers to wider use of SBMs

  14. Chesapeake Bay Impact Structure Deep Drilling Project Completes Coring

    Directory of Open Access Journals (Sweden)

    the Scientific Staff of the Chesapeake Bay Impact Structure Deep Drilling Project

    2006-09-01

    Full Text Available The Chesapeake Bay Impact Structure Deep Drilling Project (CBIS Project completed its coring operations during September–December 2005 and April–May 2006. Cores were collected continuously to a total depth of 1766 m. The recovered section consists of 1322 m of impactites beneath 444 m of post-impact continental shelf sediments.The CBIS Project is a joint venture of the International Continental Scientifi c Drilling Program (ICDP and the U.S. Geological Survey (USGS. Project activities began with a planning workshop in September 2003 attended by sixtythree scientists from ten countries. Field operations began with site preparation in July 2005, and coring began in September 2005. Drilling, Observation and Sampling of theEarth’s Continental Crust (DOSECC was the general contractor for the drilling operations throughout 2005.

  15. The impact of environmental regulations on drilling fluid technology

    International Nuclear Information System (INIS)

    Clark, R.K.

    1994-01-01

    A multitude of new drilling fluid products, systems, and treatment processes have been developed in recent years in response to increasingly stringent environmental regulations. Many fluid additives and systems that once played a major role in the drilling industry are little used today or are no longer available. New water-base mud systems are approaching the performance levels typical of conventional oil-base muds, levels largely achieved by the new synthetic-base fluids. However, these new drilling fluids do not have the adverse environmental impact associated with oil-base systems when waste fluids and cuttings are discarded. 65 refs., 3 tabs

  16. Environmental Assessment Lakeview Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    Treis, Tania [Southern Oregon Economic Development Department, Medford, OR (United States)

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  17. Exploratory borehole Schafisheim: constructional- and environmental aspects, drilling technique

    International Nuclear Information System (INIS)

    1991-04-01

    The Schafisheim borehole was the fourth borehole in the Nagra deep drilling programme in Northern Switzerland. The drilling work began on the 26th of November 1983. The final depth of 2000.6 m was reached on June 29th, 1984 and this was followed by a transition to a test phase which lasted until 25th February 1985. To reach the final depth, the borehole passed through around 1500 m of sediments and 500 m of crystalline rock. More than 50% of the drilled section, including more or less all of the crystalline rock, was cored. This report describes the drilling activities, the construction work relating to the Schafisheim site and the measures taken to ensure environmental protection. The report closes with a chapter dealing with the supervisory commission consisting of members of the federal, cantonal and local authorities and with the report series on the drilling work. (author) figs., tabs

  18. Study of environmental concerns: offshore oil and gas drilling and production

    Energy Technology Data Exchange (ETDEWEB)

    Baker, R

    1978-01-01

    Material on the environmental concerns associated with offshore drilling and production activities has been synthesized with Department of Fisheries and Environment files on specific projects, these being the primary information source. Recommendations to resolve these concerns have also been provided. Most of the environmental concerns identified in this study are traceable to specific weaknesses in offshore drilling and production procedures and management systems. Hardware weaknesses are seldom of central importance. Areas of concern include the gradual deposition of pollutants from rigs, underwater pipelines and onshore ancillary structures, and the quality of the following: action plans to deal with oil spills, standards for safety and anti-pollution equipment, information provided on the environmental hazards in offshore drilling and production areas, environmental impact assessments, and communication links between those having environmental concerns and expertise (including the public-at-large) and those who make the decisions regarding offshore oil and gas development.

  19. Environmental control technology in petroleum drilling and production

    International Nuclear Information System (INIS)

    Wojtanowicz, A.K.

    1997-01-01

    Environmental control technology (ECT) is process integrated and relates mainly to pollution prevention and risk assessment. Mechanisms of environmental impact in petroleum drilling, well completion and production, include the generation of waste, induction of toxicity or the creation of pathways for pollutant migration. The identification and evaluation of these mechanisms constitute two parts of the scope of ECT. A third part is the development of new techniques to comply with environmental requirements without prejudicing productivity. The basic concepts of the ECT approach are presented in this chapter. The approach is then used to analyse oilfield drilling and production processes. Environmental control components developed in these technologies are described. These include: the control of the volume and toxicity of drilling fluids; source separation technology in produced water cleaning; subsurface injection of oilfield waste slurries; containment technology in the integrity of petroleum wells; subsurface reduction of produced water; oilfield pit closure technology. (37 figures; 26 tables; 227 references) (UK)

  20. Environmental assessment report to BEPCo Canada Company on exploratory drilling on EL2407

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-19

    BEPCo. Canada Company (BEPCo) is planning to drill exploratory deepwater wells offshore from Nova Scotia. This environmental assessment report was prepared to satisfy regulatory requirements associated with offshore drilling. It focuses on valued environmental components chosen during a scoping process. This report evaluated the potential project-related effects on marine benthos, marine fish, marine mammals, marine turtles, marine birds, special areas, and other ocean users. Discharges and emissions from the project include drilling mud and rock cuttings, small amounts of produced water, ship discharges and atmospheric emissions. This report includes oceanographic plume modelling for allowable discharges of mud and cuttings at sea. The report predicts that the potential adverse effects of the valued environmental components will be short term and highly localized around the drilling rigs. It was suggested that any adverse effects could be mitigated through the use of technically feasible mitigation and standard offshore oil and gas industry procedures for environmental health and safety. It was concluded that BEPCo's proposed drilling program for EL-2407 can be conducted without any significant adverse effects on Nova Scotia's offshore environment. 121 refs., 27 tabs., 24 figs.

  1. Salton Sea Scientific Drilling Project: A summary of drilling and engineering activities and scientific results

    Energy Technology Data Exchange (ETDEWEB)

    Ross, H.P.; Forsgren, C.K. (eds.)

    1992-04-01

    The Salton Sea Scientific g Project (SSSDP) completed the first major well in the United States Continental Scientific Drilling Program. The well (State 2-14) was drilled to 10,W ft (3,220 m) in the Salton Sea Geothermal Field in California's Imperial Valley, to permit scientific study of a deep, high-temperature portion of an active geothermal system. The program was designed to investigate, through drilling and testing, the subsurface thermal, chemical, and mineralogical environments of this geothermal area. Extensive samples and data, including cores, cuttings, geothermal fluids and gases, and geophysical logs, were collected for future scientific analysis, interpretation, and publication. Short duration flow tests were conducted on reservoirs at a depth of approximately 6,120 ft (1,865 m) and at 10,136 ft (3,089 m). This report summarizes all major activities of the SSSDP, from project inception in the fall of 1984 through brine-pond cleanup and site restoration, ending in February 1989. This report presents a balanced summary of drilling, coring, logging, and flow-test operations, and a brief summary of technical and scientific results. Frequent reference is made to original records, data, and publication of results. The report also reviews the proposed versus the final well design, and operational summaries, such as the bit record, the casing and cementing program, and the coring program. Summaries are and the results of three flow tests. Several teamed during the project.

  2. Deep-Time drilling in the Australian Archean: the Agouron Institute geobiological drilling project. (Invited)

    Science.gov (United States)

    Buick, R.

    2010-12-01

    The Agouron Institute has sponsored deep-time drilling across the South African Archean-Proterozoic boundary, investigating the rise of oxygen over an onshore-offshore environmental transect. It is now supporting a drilling program in the Australian Archean of the Pilbara Craton, addressing a similar theme but with the added goal of resolving controversy over the age and origin of hydrocarbon biomarker molecules in ancient kerogenous shales. As these have been claimed to provide evidence for the evolution of oxygenic photosynthesis long before the rise of atmospheric oxygen to persistently high levels during the ~2.3 Ga “Great Oxidation Event”, their syngenesis with their host shales is thus of critical importance for the interpretation of Earth’s early oxygenation history. During the first drilling season, 3 holes were drilled using techniques and equipment to minimize organic geochemical contamination (new drill-string components cleaned before drilling potentially biomarker-bearing rocks, pre-contamination of drilling fluid with a synthetic organic compound of similar geochemical characteristics to biomarkers, sterile cutting and storage of samples immediately upon retrieval from the core-barrel). The initial hole was a blank control for organic geochemistry, drilled into rocks too metamorphosed to retain biomarker molecules. These rocks, cherts, carbonates and pelites of the 3.52 Ga Coucal Formation, Coonterunah Group, have been metamorphosed to upper greenschist facies at temperatures near 500°C and so should have had any ancient soluble hydrocarbons destroyed. However, because they contain both carbonate and organic carbon, these rocks can instead provide isotopic information about the earliest evolution of biological metabolism as they possess residues of both the reactant and product sides of the carbon-fixation reaction. The second hole sampled an on-shore section of carbonates and kerogenous shales in the ~2.65 Ga Carawine Dolomite and Lewin Shale

  3. Framework for a comparative environmental assessment of drilling fluids

    Energy Technology Data Exchange (ETDEWEB)

    Meinhold, A.F.

    1998-11-01

    During the drilling of an oil or gas well, drilling fluid (or mud) is used to maintain well control and to remove drill cuttings from the hole. In response to effluent limitation guidelines promulgated by the US Environmental Protection Agency (EPA) for discharge of drilling wastes offshore, alternatives to water and oil-based muds have been developed. These synthetic-based muds (SBMs) are more efficient than water-based muds (WBMs) for drilling difficult and complex formation intervals and have lower toxicity and smaller environmental impacts than diesel or conventional mineral oil-based muds (OBMs). A third category of drilling fluids, derived from petroleum and called enhanced mineral oils (EMOs), also have these advantages over the traditionally used OBMs and WBMs. EPA recognizes that SBMs and EMOs are new classes of drilling fluids, but their regulatory status is unclear. To address this uncertainty, EPA is following an innovative presumptive rulemaking process that will develop final regulations for SBM discharges offshore in less than three years. This report develops a framework for a comparative risk assessment for the discharge of SBMs and EMOs, to help support a risk-based, integrated approach to regulatory decision making. The framework will help identify potential impacts and benefits associated with the use of SBMs, EMOs, WBMs, and OBMs; identify areas where additional data are needed; and support early decision-making in the absence of complete data. As additional data becomes available, the framework can support a full quantitative comparative assessment. Detailed data are provided to support a comparative assessment in the areas of occupational and public health impacts.

  4. Real time observation system for monitoring environmental impact on marine ecosystems from oil drilling operations.

    Science.gov (United States)

    Godø, Olav Rune; Klungsøyr, Jarle; Meier, Sonnich; Tenningen, Eirik; Purser, Autun; Thomsen, Laurenz

    2014-07-15

    Environmental awareness and technological advances has spurred development of new monitoring solutions for the petroleum industry. This paper presents experience from a monitoring program off Norway. To maintain operation within the limits of the government regulations Statoil tested a new monitoring concept. Multisensory data were cabled to surface buoys and transmitted to land via wireless communication. The system collected information about distribution of the drilling wastes and the welfare of the corals in relation to threshold values. The project experienced a series of failures, but the backup monitoring provided information to fulfil the requirements of the permit. The experience demonstrated the need for real time monitoring and how such systems enhance understanding of impacts on marine organisms. Also, drilling operations may improve by taking environmental information into account. The paper proposes to standardize and streamline monitoring protocols to maintain comparability during all phases of the operation and between drill sites. Copyright © 2014 Elsevier Ltd. All rights reserved.

  5. Superhot Drilling in Iceland, the Experience of the Iceland Deep Drilling Project.

    Science.gov (United States)

    Elders, W. A.; Friðleifsson, G. Ó.; Zierenberg, R. A.; Fowler, A. P.

    2017-12-01

    The Iceland Deep Drilling Project aims to improve geothermal economics by producing supercritical fluids (www.iddp.is). Supercritical wells could yield an order of magnitude more usable energy than that from conventional geothermal wells because of higher enthalpy and enhanced flow properties. In 2009, the IDDP-1 well failed to reach supercritical conditions in the Krafla caldera in NE Iceland, after encountering rhyolite magma at only 2.1 km depth. The completed geothermal well became the world's hottest and produced superheated steam with a wellhead temperature of 452°C and flow sufficient to generate 35 MWe. The IDDP next moved SW to the Reykjanes Peninsula, the landward extension of the Mid-Atlantic Ridge, where it is possible to study an analog of the roots of a black smoker. Reykjanes is unique among Icelandic geothermal systems in being recharged by seawater, which has a critical point of 406°C at 298 bars. Drilling began by deepening an existing 2.5 km deep production well to 3 km depth, and then angling it towards the main upflow zone of the system, for a total slant depth of 4,659 m. Total circulation losses were encountered below 3 km that could not be cured by lost circulation materials or by multiple cement jobs. Accordingly, drilling continued to total depth without return of drill cuttings. We attempted 13 core runs below 3 km depth, only half of which recovered core. The cores are basalts and dolerites with alteration ranging from lower greenschist facies to lower amphibolite facies, suggesting formation temperatures >450°C. After the end of drilling in January 2017, following only six days of heating, supercritical conditions (426°C at 340 bars) were measured in the well at a depth of 4.5 km. The well has not yet been allowed to equilibrate to full in situ temperature. A perforated liner was inserted to 4,570 m, depth to facilitate temperature cycling to enhance permeability at depth through thermal cracking. In 2018 this will be followed by a

  6. Federal Environmental Regulations Impacting Hydrocarbon Exploration, Drilling, and Production Operations

    Energy Technology Data Exchange (ETDEWEB)

    Carroll, Herbert B.; Johnson, William I.

    1999-04-27

    Waste handling and disposal from hydrocarbon exploration, drilling, and production are regulated by the US Environmental Protection Agency (EPA) through federal and state regulations and/or through implementation of federal regulations. Some wastes generated in these operations are exempt under the Resource Conservation and Recovery Act (RCRA) but are not exempt under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), Superfund Amendments and Reauthorization Act (SARA), and other federal environmental laws. Exempt wastes remain exempt only if they are not mixed with hazardous wastes or hazardous substances. Once mixture occurs, the waste must be disposed as a hazardous material in an approved hazardous waste disposal facility. Before the Clean Air Act as amended in 1990, air emissions from production, storage, steam generation, and compression facilities associated with hydrocarbon exploration, drilling, and production industry were not regulated. A critical proposed regulatory change which will significantly effect Class II injection wells for disposal of produced brine and injection for enhanced oil recovery is imminent. Federal regulations affecting hydrocarbon exploration, drilling and production, proposed EPA regulatory changes, and a recent significant US Court of Appeals decision are covered in this report. It appears that this industry will, in the future, fall under more stringent environmental regulations leading to increased costs for operators.

  7. Environmental effects of exploratory drilling offshore Canada : environmental effects monitoring data and literature review : final report

    International Nuclear Information System (INIS)

    Hurley, G.; Ellis, J.

    2004-10-01

    This study examined pertinent environmental effects monitoring (EEM) information and data associated with offshore exploratory and development drilling in Canada. Two approaches were used: (1) a review of scientific literature was conducted to provide a synthesis of knowledge concerning interactions between exploratory drilling and the environment; and (2) a review of pertinent Canadian EEM data was conducted to evaluate interactions between exploratory drilling and the environment. Virtually all the east coast Canadian data reviewed in the study related to the effects of multiple wells. Although the effects of drilling waste were a primary focus, the effects of accidental discharges, lights and flaring, atmospheric emissions and noise emissions were also considered. Changes in the diversity and abundance of benthic organisms were detected within 1000 metres of many drill sites. The fine particles in drilling wastes contributed to the environmental effects observed around drilling platforms, and elevated body burden concentrations of drill waste indicators were detected over larger scales in a wide range of taxonomic groups. The results of laboratory and field studies suggested a lower potential for toxicity on commercial finfish and shellfish species. However, it was observed that measuring the effects of elevated concentrations of contaminants remained a challenge due to high levels variability in literature studies. A precautionary approach to the management of seismic surveys was recommended. It was concluded that the potential cumulative impacts of exploration drilling should be considered in the context of other anthropogenic activities. 138 refs., 6 tabs.

  8. Health Impact Assessment of an oil drilling project in California

    OpenAIRE

    Lindsay C. McCallum; Kathleen Souweine; Mary McDaniel; Bart Koppe; Christine McFarland; Katherine Butler; Christopher A. Ollson

    2016-01-01

    Objectives: The Health Impact Assessment (HIA) was conducted to evaluate the potential community health implications of a proposed oil drilling and production project in Hermosa Beach, California. The HIA considered 17 determinants of health that fell under 6 major categories (i.e., air quality, water and soil quality, upset conditions, noise and light emissions, traffic, and community livability). Material and Methods: This paper attempts to address some of the gaps within the HIA practice b...

  9. Oman Drilling Project Phase I Borehole Geophysical Survey

    Science.gov (United States)

    Matter, J. M.; Pezard, P. A.; Henry, G.; Brun, L.; Célérier, B.; Lods, G.; Robert, P.; Benchikh, A. M.; Al Shukaili, M.; Al Qassabi, A.

    2017-12-01

    The Oman Drilling Project (OmanDP) drilled six holes at six sites in the Samail ophiolite in the southern Samail and Tayin massifs. 1500-m of igneous and metamorphic rocks were recovered at four sites (GT1, GT2, GT3 and BT1) using wireline diamond core drilling and drill cuttings at two sites (BA1, BA2) using air rotary drilling, respectively. OmanDP is an international collaboration supported by the International Continental Scientific Drilling Program, the Deep Carbon Observatory, NSF, NASA, IODP, JAMSTEC, and the European, Japanese, German and Swiss Science Foundations, and with in-kind support in Oman from Ministry of Regional Municipalities and Water Resources, Public Authority of Mining, Sultan Qaboos University and the German University of Technology. A comprehensive borehole geophysical survey was conducted in all the OmanDP Phase I boreholes shortly after drilling in April 2017. Following geophysical wireline logs, using slim-hole borehole logging equipment provided and run by the Centre National De La Recherche Scientifique (CNRS) and the Université de Montpellier/ Géosciences Montpellier, and logging trucks from the Ministry of Regional Municipalities and Water Resources, were collected in most of the holes: electrical resistivity (dual laterolog resistivity, LLd and LLs), spectral gamma ray (K, U, and Th contents), magnetic susceptibility, total natural gamma ray, full waveform sonic (Vp and Vs), acoustic borehole wall imaging, optical borehole wall imaging, borehole fluid parameters (pressure, temperature, electrical conductivity, dissolved oxygen, pH, redox potential, non-polarized spontaneous electrical potential), and caliper (borehole diameter). In addition, spinner flowmeter (downhole fluid flow rate along borehole axis) and heatpulse flow meter logs (dowhole fluid flow rate along borehole axis) were collected in BA1 to characterize downhole fluid flow rates along borehole axis. Unfortuantely, only incomplete wireline logs are available for

  10. Casing pull tests for directionally drilled environmental wells

    International Nuclear Information System (INIS)

    Staller, G.E.; Wemple, R.P.; Layne, R.R.

    1994-11-01

    A series of tests to evaluate several types of environmental well casings have been conducted by Sandia National Laboratories (SNL) and it's industrial partner, The Charles Machine Works, Inc. (CMW). A test bed was constructed at the CMW test range to model a typical shallow, horizontal, directionally drilled wellbore. Four different types of casings were pulled through this test bed. The loads required to pull the casings through the test bed and the condition of the casing material were documented during the pulling operations. An additional test was conducted to make a comparison of test bed vs actual wellbore casing pull loads. A directionally drilled well was emplaced by CMW to closely match the test bed. An instrumented casing was installed in the well and the pull loads recorded. The completed tests are reviewed and the results reported

  11. Casing pull tests for directionally drilled environmental wells

    Energy Technology Data Exchange (ETDEWEB)

    Staller, G.E.; Wemple, R.P. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-11-01

    A series of tests to evaluate several types of environmental well casings have been conducted by Sandia National Laboratories (SNL) and it`s industrial partner, The Charles Machine Works, Inc. (CMW). A test bed was constructed at the CMW test range to model a typical shallow, horizontal, directionally drilled wellbore. Four different types of casings were pulled through this test bed. The loads required to pull the casings through the test bed and the condition of the casing material were documented during the pulling operations. An additional test was conducted to make a comparison of test bed vs actual wellbore casing pull loads. A directionally drilled well was emplaced by CMW to closely match the test bed. An instrumented casing was installed in the well and the pull loads recorded. The completed tests are reviewed and the results reported.

  12. Crump Geyser Exploration and Drilling Project. High Precision Geophysics and Detailed Structural Exploration and Slim Well Drilling

    Energy Technology Data Exchange (ETDEWEB)

    Fairbank, Brian D. [Nevada Geothermal Power Company, Vancouver (Canada); Smith, Nicole [Nevada Geothermal Power Company, Vancouver (Canada)

    2015-06-10

    The Crump Geyser Exploration and Drilling Project – High Precision Geophysics and Detailed Structural Exploration and Slim Well Drilling ran from January 29, 2010 to September 30, 2013. During Phase 1 of the project, collection of all geophysical surveys was completed as outlined in the Statement of Project Objectives. In addition, a 5000-foot full sized exploration well was drilled by Ormat, and preexisting drilling data was discovered for multiple temperature gradient wells within the project area. Three dimensional modeling and interpretation of results from the geophysical surveys and drilling data gave confidence to move to the project into Phase 2 drilling. Geological and geophysical survey interpretations combined with existing downhole temperature data provided an ideal target for the first slim-hole drilled as the first task in Phase 2. Slim-hole 35-34 was drilled in September 2011 and tested temperature, lithology, and permeability along the primary range-bounding fault zone near its intersection with buried northwest-trending faults that have been identified using geophysical methods. Following analysis of the results of the first slim-hole 35-34, the second slim hole was not drilled and subsequent project tasks, including flowing differential self-potential (FDSP) surveys that were designed to detail the affect of production and injection on water flow in the shallow aquifer, were not completed. NGP sold the Crump project to Ormat in August 2014, afterwards, there was insufficient time and interest from Ormat available to complete the project objectives. NGP was unable to continue managing the award for a project they did not own due to liability issues and Novation of the award was not a viable option due to federal award timelines. NGP submitted a request to mutually terminate the award on February 18, 2015. The results of all of the technical surveys and drilling are included in this report. Fault interpretations from surface geology, aeromag

  13. Review of BEPCo's exploration drilling environmental assessment update

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-01

    This report was presented in response to a request from the Canada-Nova Scotia Offshore Petroleum Board for advice on the accuracy of an update to an environmental assessment report related to BEPCo's proposed exploratory drilling project offshore of Nova Scotia, which had received approval in June 2005 but was then delayed. BEPCo was seeking approval to proceed with the same project from 2009 to 2015, although the proposed project lease area was half the size of the original proposal. Advice was sought with respect to potential drilling and seismic impacts to the marine environment, any new information since 2005 regarding marine benthic habitat, non-commercial fish species, marine animals, or spawning areas of critical habitat in the area, and whether DFO Science was planning to undertake research in the area during the period in question. Summaries were presented for the new environmental impact information and the new ecosystem information, including updated species at risk information. BEPCo's updated environmental assessment did not include all of the newly available information. Although it was not clear that is new information would change the conclusions of the initial environmental assessment, it would be useful in designing and implementing an Environmental Effects Monitoring program. 21 refs.

  14. The SCOPSCO drilling project recovers more than 1.2 million years of history from Lake Ohrid

    NARCIS (Netherlands)

    Wagner, B.; Wilke, T.; Krastel, S.; Zanchetta, G.; Sulpizio, R.; Reicherter, K.; Leng, M. J.; Grazhdani, A.; Trajanovski, S.; Francke, A.; Lindhorst, K.; Levkov, Z.; Cvetkoska, Aleksandra; Reed, J. M.; Zhang, X.; Lacey, J. H.; Wonik, T.; Baumgarten, H.; Vogel, H.

    2014-01-01

    The Scientific Collaboration on Past Speciation Conditions in Lake Ohrid (SCOPSCO) project is an international research initiative to study the influence of major geological and environmental events on the biological evolution of lake taxa. SCOPSCO drilling campaigns were carried out in 2011 and

  15. A different challenge: the directional drilled crossing for the Yacuiba - Rio Grande Gas Line Project - GASYRG

    Energy Technology Data Exchange (ETDEWEB)

    Green, Wayne; Garcia, Francisco [Bolinter Ltda., Santa Cruz (Bolivia); Montano, Ruben [Transierra, Santa Cruz (Bolivia)

    2003-07-01

    The Rio Grande River's directional drilling, 2002 m. long and 25 m. deep was a great challenge for Transierra - Owner - as well as Laney - Bolinter - Contractor - to accomplish a feat yet to be done in the entire world. The dedication of the people involved showed their degree of professionalism that these companies have obtained and the determination in doing the job overcoming unforeseen obstacles and still being able to finish on time, mitigating environmental impacts and leaving a first class crossing. This document presents a description of the technical, logistic and construction factors that were involved in the project and which allowed to perform 7 directional drillings, including Rio Grande River, which during the pull got the last 60 m. of pipe stuck, being freed only after using a pneumatic hammer. (author)

  16. The tunnel project. Drill hole logging and structural geologic studies in the Grualia, the Lunner county

    International Nuclear Information System (INIS)

    Elvebakk, Harald; Braathen, Alvar; Roenning, Jan S.; Nordgulen, Oeystein

    2001-01-01

    In connection with the project ''Environmental and community useful tunnels'' the Norwegian Geologic Survey (NGU) has made geologic and geophysical investigations along parts of the tunnel at the Grualia in the Lunner county. The purpose of the geologic studies was to map and investigate weakness zones in the rock foundations. The geophysical studies aimed at testing techniques that was in little use in preliminary studies for tunnel operations. The methods used have been optical inspection of drill holes, measurements of temperature and conductivity in the water and the measuring of the natural gamma radiation in the drill holes. The resistivity in the drill holes is also determined and test pumping with flow measurements is carried out in order to calculate the well water influx capacity. These methods may contribute to information about the rock condition (cracking, water influx). Previously the NGU has made 2D resistivity measurements at the ground in the tunnel in order to map the weakness zones. The results from the measurements in 6 wells show large variations in the rock qualities. The wells are drilled towards indicated weakness zones. Open water conducting cracks and sections with largely cracked rocks are detected in or in the proximity of the tunnel route. The weakness zone between the hornfels and the syenite west of the Langvatnet is largely cracked, has a large water conducting capacity and there are some unstable masses. Further east several open, water- conducting cracks are detected in the syenite. Furthest to the east in the route cracked and unstable rocks are found. Several of the holes are blocked by ravines which confirm the poor rock quality. In the particular areas problems are to be expected during the operation with respect to water influx and stability. Methodically the drill hole studies have shown great value for the follow up of the 2D resistivity measurements on the ground. The indicated weakness zones through the 2D have been

  17. Health Impact Assessment of an oil drilling project in California

    Directory of Open Access Journals (Sweden)

    Lindsay C. McCallum

    2016-04-01

    Full Text Available Objectives: The Health Impact Assessment (HIA was conducted to evaluate the potential community health implications of a proposed oil drilling and production project in Hermosa Beach, California. The HIA considered 17 determinants of health that fell under 6 major categories (i.e., air quality, water and soil quality, upset conditions, noise and light emissions, traffic, and community livability. Material and Methods: This paper attempts to address some of the gaps within the HIA practice by presenting the methodological approach and results of this transparent, comprehensive HIA; specifically, the evaluation matrix and decision-making framework that have been developed for this HIA and form the basis of the evaluation and allow for a clear conclusion to be reached in respect of any given health determinant (i.e., positive, negative, neutral. Results: There is a number of aspects of the project that may positively influence health (e.g., increased education funding, ability to enhance green space, and at the same time there have been potential negative effects identified (e.g., odor, blowouts, property values. Except for upset conditions, the negative health outcomes have been largely nuisance-related (e.g., odor, aesthetics without irreversible health impacts. The majority of the health determinants, that had been examined, have revealed that the project would have no substantial effect on the health of the community. Conclusions: Using the newly developed methodology and based on established mitigation measures and additional recommendations provided in the HIA, the authors have concluded that the project will have no substantial effect on community health. This approach and methodology will assist practitioners, stakeholders and decision-makers in advancing the HIA as a useful, reproducible, and informative tool.

  18. Health Impact Assessment of an oil drilling project in California.

    Science.gov (United States)

    McCallum, Lindsay C; Souweine, Kathleen; McDaniel, Mary; Koppe, Bart; McFarland, Christine; Butler, Katherine; Ollson, Christopher A

    2016-01-01

    The Health Impact Assessment (HIA) was conducted to evaluate the potential community health implications of a proposed oil drilling and production project in Hermosa Beach, California. The HIA considered 17 determinants of health that fell under 6 major categories (i.e., air quality, water and soil quality, upset conditions, noise and light emissions, traffic, and community livability). This paper attempts to address some of the gaps within the HIA practice by presenting the methodological approach and results of this transparent, comprehensive HIA; specifically, the evaluation matrix and decision-making framework that have been developed for this HIA and form the basis of the evaluation and allow for a clear conclusion to be reached in respect of any given health determinant (i.e., positive, negative, neutral). There is a number of aspects of the project that may positively influence health (e.g., increased education funding, ability to enhance green space), and at the same time there have been potential negative effects identified (e.g., odor, blowouts, property values). Except for upset conditions, the negative health outcomes have been largely nuisance-related (e.g., odor, aesthetics) without irreversible health impacts. The majority of the health determinants, that had been examined, have revealed that the project would have no substantial effect on the health of the community. Using the newly developed methodology and based on established mitigation measures and additional recommendations provided in the HIA, the authors have concluded that the project will have no substantial effect on community health. This approach and methodology will assist practitioners, stakeholders and decision-makers in advancing the HIA as a useful, reproducible, and informative tool. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  19. MONDO Project: real time ocean monitoring through Lagrangian drifters during offshore drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Mafra, Tatiana [Eni Oil do Brasil, Rio de Janeiro, RJ (Brazil); Fragoso, Mauricio da Rocha; Santos, Francisco Alves dos; Cruz, Leonardo M. Marques A.; Pellegrini, Julio A.C.; Cerrone, Bruna Nogueira [Prooceano, Rio de Janeiro, RJ (Brazil); Assireu, Arcilan Trevenzoli [Instituto Nacional de Pesquisas Espaciais (INPE), Sao Jose dos Campos, SP (Brazil)

    2008-07-01

    Monitoring the ocean conditions during offshore operations is essential for both operational and environmental aspects. Environmentally, not only to know better the environment where the activity is taking place, but also to be able to provide fast and accurate response in case of accidents. MONDO Project (Monitoring by Ocean Drifters) is a pioneer initiative from ENI Oil do Brasil and PROOCEANO that aimed to monitor currents as a part of a metoceanographic data monitoring project of drilling operations in Brazilian Waters, in Santos Basin throughout September to November 2007, 40 satellite tracked ocean drifters were deployed will be transmitting data up to November 2008. The results of this project can be used to study a wide range of subjects about ocean dynamics. Following the principles of social and environmental responsibility, MONDO Project aims to benefit the local ecosystem in increasing the scientific knowledge of the area to calibrate hydrodynamic models that will lead to more accurate modeling results and, as a consequence, to a better management of contingency plans. Based on these principles, the project will also provide unrestricted access to oceanographic data even after the end of operations. (author)

  20. Environmental Control Project

    International Nuclear Information System (INIS)

    Anon.

    Research carried out in the Environmental Control Project of the 'Centro de Energia Nuclear na Agricultura' (CENA), Piracicaba , Sao Paulo State, Brazil, is described. Such research comprises: determination of ions and metals in waters from different sources; survey of the mineralogical composition of Amazon Basin rivers; development of specific methodologies for the determination of minerals in studies of mineral nutrition of plants and animal nutrition; development of methodologies for the determination of wood sample density, a nuclear method being developed to be applied to field conditions; study of the water flux mouvement within wood. (M.A.) [pt

  1. Geologic report on the Sand Wash Drilling Project, Moffat and Routt Counties, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    Carter, T.E.; Wayland, T.E.

    1981-09-01

    The Sand Wash Basin Drilling Project comprises twenty-seven (27) drill holes located in Moffat and Routt Counties, northwest Colorado, having an aggregate depth of 26,107.5 feet (7957.6 m). The holes penetrate the Browns Park Formation of Miocene age, which is a tuffaceous continental sandstone deposited in fluvial, eolian, and lacustrine environments. Partly based on project drilling results, uranium potential resource estimates for this formation in the $50/lb U/sub 3/O/sub 8/ forward-cost category have been increased by 34,476 tons U/sub 3/O/sub 8/ (35,036 metric tons). Three areas between Maybell and Craig, Colorado, considered favorable for uranium occurrences were verified as favorable by project drilling, and a fourth favorable area northwest of Maybell has been expanded. In addition, project drilling results indicate two new favorable areas, one north and northwest and one south of Steamboat Springs, Colorado. Anomalous radioactivity was detected in drill holes in all six study areas of the project. The most important factor in concentrating significant amounts of uranium in the target formation appears to be the availability of gaseous or liquid hydrocarbons and/or hydrogen sulfide gas as reductants. Where subjacent formations supply these reductants to the Browns Park Formation, project drilling encountered 0.05 percent to 0.01 percent uranium concentrations. Potential, though unproven, sources of these reductants are believed to underlie parts of all six project study areas.

  2. Geologic report on the Sand Wash Drilling Project, Moffat and Routt Counties, Colorado

    International Nuclear Information System (INIS)

    Carter, T.E.; Wayland, T.E.

    1981-09-01

    The Sand Wash Basin Drilling Project comprises twenty-seven (27) drill holes located in Moffat and Routt Counties, northwest Colorado, having an aggregate depth of 26,107.5 feet (7957.6 m). The holes penetrate the Browns Park Formation of Miocene age, which is a tuffaceous continental sandstone deposited in fluvial, eolian, and lacustrine environments. Partly based on project drilling results, uranium potential resource estimates for this formation in the $50/lb U 3 O 8 forward-cost category have been increased by 34,476 tons U 3 O 8 (35,036 metric tons). Three areas between Maybell and Craig, Colorado, considered favorable for uranium occurrences were verified as favorable by project drilling, and a fourth favorable area northwest of Maybell has been expanded. In addition, project drilling results indicate two new favorable areas, one north and northwest and one south of Steamboat Springs, Colorado. Anomalous radioactivity was detected in drill holes in all six study areas of the project. The most important factor in concentrating significant amounts of uranium in the target formation appears to be the availability of gaseous or liquid hydrocarbons and/or hydrogen sulfide gas as reductants. Where subjacent formations supply these reductants to the Browns Park Formation, project drilling encountered 0.05 percent to 0.01 percent uranium concentrations. Potential, though unproven, sources of these reductants are believed to underlie parts of all six project study areas

  3. Environmental Report Utah State Prison Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-03-01

    This environmental report assesses the potential impact of developing a geothermal resource for space heating at the Utah State Prison. Wells will be drilled on prison property for production and for injection to minimize reservoir depletion and provide for convenient disposal of cooled fluid. The most significant environmental concerns are the proper handling of drilling muds during well drilling and the disposal of produced water during well testing. These problems will be handled by following currently accepted practices to reduce the potential risks.

  4. The Hominin Sites and Paleolakes Drilling Project (HSPDP): Understanding the paleoenvironmental and paleoclimatic context of human origins through continental drilling

    Science.gov (United States)

    Cohen, Andrew S.; Campisano, Christopher; Asrat, Asfawossen; Arrowsmith, Ramon; Deino, Alan; Feibel, Craig; Hill, Andrew; Kingston, John; Lamb, Henry; Lowenstein, Tim; Olago, Daniel; Bernhart Owen, R.; Renaut, Robin; Schabitz, Frank; Trauth, Martin

    2015-04-01

    The influence of climate and environmental history on human evolution is an existential question that continues to be hotly debated, in part because of the paucity of high resolution records collected in close proximity to the key fossil and archaeological evidence. To address this issue and transform the scientific debate, the HSPDP was developed to collect lacustrine sediment drill cores from basins in Kenya and Ethiopia that collectively encompass critical time intervals and locations for Plio-Quaternary human evolution in East Africa. After a 17 month campaign, drilling was completed in November, 2014, with over 1750m of core collected from 11 boreholes from five areas (1930m total drilling length, avg. 91% recovery). The sites, from oldest to youngest, include 1) N. Awash, Ethiopia (~3.5-2.9Ma core interval); 2) Baringo-Tugen Hills, Kenya (~3.3-2.5Ma); 3) West Turkana, Kenya (~1.9-1.4Ma); L. Magadi, Kenya (0.8-0Ma) and the Chew Bahir Basin, Ethiopia (~0.5-0Ma). Initial core description (ICD) and sampling for geochronology, geochemistry and paleoecology studies had been completed by mid2014, with the two remaining sites (Magadi and Chew Bahir) scheduled for ICD work in early 2015. Whereas the primary scientific targets were the lacustrine deposits from the hominin-bearing basin depocenters, many intervals of paleosols (representative of low lake stands and probable arid periods) were also encountered in drill cores. Preliminary analyses of drill core sedimentology and geochemistry show both long-term lake level changes and cyclic variability in lake levels, both of which may be indicative of climatic forcing events of interest to paleoanthropologists. Authors of this abstract also include the entire HSPDP field team.

  5. Environmental effects of a discharge of drill cuttings contaminated with ester-based drilling muds in the North Sea

    International Nuclear Information System (INIS)

    Daan, R.; Booij, K.; Mulder, M.; Weerlee, E.M. van

    1996-01-01

    A field-monitoring program has been carried out to assess the environmental effects associated with drill cutting discharges at a drilling location in the North Sea, after drilling with ester-based muds. The study included a baseline survey just before drilling started and three postdrilling surveys, 1, 4, and 11 months after termination of drilling. During these surveys, ester concentrations and macrofauna densities were determined at distances between 75 and 3,000 m from the well. For the first and second postdrilling surveys, ester concentrations ranged between 2 and 4,700 mg·kg -1 dry sediment. During the third survey, esters were detected up to 200 m, with concentrations between 1 and 250 mg·kg -1 dry sediment. Between 500 and 3,000 m, ester concentrations were below detection level. The half-life was estimated as 133 d. This value reflects the composite effects of biodegradation and sediment relocation. During the second postdrilling survey, a reduced abundance as well as a reduced species richness of the macrofauna was observed up to 200 m from the well. Also, the presence of Capitella capitata was an obvious sign of disturbed sediment conditions in this area. A few species showed abundance gradients over the whole sampling transect and occurred in reduced abundance up to 500 or 1,000 m compared to the 3,000-m reference station. The third postdrilling survey clearly revealed effects at 75 to 200 m from the well. At distances ≥500 m, persistent effects could no longer be demonstrated. Although the results of the present study show that effects had not completely disappeared after 1 year, there are signs of recovery of the macrobenthos, because a reasonable number of species had recolonized the area in the vicinity of the well site, particularly at 200 m, in fairly high numbers

  6. Brushy Basin drilling project, Cedar Mountain, Emergy County, Utah

    International Nuclear Information System (INIS)

    Kiloh, K.D.; McNeil, M.; Vizcaino, H.

    1980-03-01

    A 12-hole drilling program was conducted on the northwestern flank of the San Rafael swell of eastern Utah to obtain subsurface geologic data to evaluate the uranium resource potential of the Brushy Basin Member of the Morrison Formation (Jurassic). In the Cedar Mountain-Castle Valley area, the Brushy Basin Member consists primarily of tuffaceous and carbonaceous mudstones. Known uranium mineralization is thin, spotty, very low grade, and occurs in small lenticular pods. Four of the 12 drill holes penetrated thin intervals of intermediate-grade uranium mineralization in the Brushy Basin. The study confirmed that the unit does not contain significant deposits of intermediate-grade uranium

  7. Heat-flow and lateral seismic-velocity heterogeneities near Deep Sea Drilling Project-Ocean Drilling Program Site 504

    Science.gov (United States)

    Lowell, Robert P.; Stephen, Ralph A.

    1991-11-01

    Both conductive heat-flow and seismic-velocity data contain information relating to the permeability of the oceanic crust. Deep Sea Drilling Project-Ocean Drilling Program Site 504 is the only place where both detailed heat-flow and seismic-velocity field studies have been conducted at the same scale. In this paper we examine the correlation between heat flow and lateral heterogeneities in seismic velocity near Site 504. Observed heterogeneities in seismic velocity, which are thought to be related to variations in crack density in the upper 500 m of the basaltic crust, show little correlation with the heat-flow pattern. This lack of correlation highlights some of the current difficulties in using seismic-velocity data to infer details of spatial variations in permeability that are significant in controlling hydrothermal circulation.

  8. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1992-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  9. Magma-Hydrothermal Transition: Basalt Alteration at Supercritical Conditions in Drill Core from Reykjanes, Iceland, Iceland Deep Drilling Project.

    Science.gov (United States)

    Zierenberg, R. A.; Fowler, A. P.; Schiffman, P.; Fridleifsson, G. Ó.; Elders, W. A.

    2017-12-01

    The Iceland Deep Drilling Project well IDDP-2, drilled to 4,659 m in the Reykjanes geothermal system, the on-land extension of the Mid Atlantic Ridge, SW Iceland. Drill core was recovered, for the first time, from a seawater-recharged, basalt-hosted hydrothermal system at supercritical conditions. The well has not yet been allowed to heat to in situ conditions, but temperature and pressure of 426º C and 340 bar was measured at 4500 m depth prior to the final coring runs. Spot drill cores were recovered between drilling depths of 3648.00 m and 4657.58 m. Analysis of the core is on-going, but we present the following initial observations. The cored material comes from a basaltic sheeted dike complex in the brittle-ductile transition zone. Felsic (plagiogranite) segregation veins are present in minor amounts in dikes recovered below 4300 m. Most core is pervasively altered to hornblende + plagioclase, but shows only minor changes in major and minor element composition. The deepest samples record the transition from the magmatic regime to the presently active hydrothermal system. Diabase near dike margins has been locally recrystallized to granoblastic-textured orthopyroxene-clinopyroxe-plagioclase hornfels. High temperature hydrothermal alteration includes calcic plagioclase (up to An100) and aluminous hornblende (up to 11 Wt. % Al2O3) locally intergrown with hydrothermal biotite, clinopyroxene, orthopyroxene and/or olivine. Hydrothermal olivine is iron-rich (Mg # 59-64) compared to expected values for igneous olivine. Biotite phenocrysts in felsic segregation veins have higher Cl and Fe compared to hydrothermal biotites. Orthopyroxene-clinopyroxene pairs in partially altered quench dike margins give temperature of 955° to 1067° C. Orthopyroxene-clinopyroxene pairs from hornfels and hydrothermal veins and replacements give temperature ranging from 774° to 888° C. Downhole fluid sampling is planned following thermal equilibration of the drill hole. Previous work

  10. Scientific Results of Conduit Drilling in the Unzen Scientific Drilling Project (USDP

    Directory of Open Access Journals (Sweden)

    Kozo Uto

    2005-09-01

    Full Text Available Abstract Directional drilling at Unzen Volcano in Japan duringmid of 2004 penetrated the magma conduit and successfullyrecovered samples of the lava dike that is believed to havefed the 1991–1995 eruption. The dike was sampled about1.3 km below the volcano’s summit vent and is intrudedinto a broader conduit zone that is 0.5 km wide. This zoneconsists of multiple older lava dikes and pyroclastic veinsand has cooled to less than 200˚C. The lava dike sample wasunexpectedly altered, suggesting that circulation of hydrothermalfluids rapidly cools the conduit region of even veryactive volcanoes. It is likely that seismic signals monitoredprior to emergence of the lava dome reflected fracturing ofthe country rocks, caused by veining as volatiles escapedpredominantly upward, not outward, from the rising magma.Geophysical and geological investigation of cuttings andcore samples from the conduit and of bore-hole logging datacontinues.

  11. The Florida Ranchlands Environmental Services Project: Field Testing a Pay-for-Environmental-Services Program

    OpenAIRE

    Lynch, S.; Shabman, L.

    2007-01-01

    The Florida Ranchlands Environmental Services Project (FRESP) was recently launched, which will field test a program to complement the existing restoration programs such as the Lake Okeechobee Protection Plan (LOPP), which uses public funding to build treatment wetlands, drill aquifer storage, and capture rainwater (to delay its arrival downstream). FRESP will pay cattle ranchers to provide environmental services that will benefit the lake. PES-1 (Payments for Environmental Services Associ...

  12. Environmental Measurement While Drilling System for Real-Time Field Screening of Contaminants

    International Nuclear Information System (INIS)

    Lockwood, G.J.; Normann, R.A.; Williams, C.V.

    1999-01-01

    Sampling during environmental drilling is essential to fully characterize the spatial distribution and migration of subsurface contaminants. However, analysis of the samples is expensive and time-consuming: off-site laboratory analysis can take weeks or months. Real-time information on environmental conditions, drill bit location and temperature during drilling is valuable in many environmental restoration operations. This type of information can be used to provide field screening data and improved efficiency of site characterization activities. The Environmental Measurement-While-Drilling (EMWD) System represents an innovative blending of new and existing technology in order to obtain real-time data during drilling. The system consists of two subsystems. The down-hole subsystem (at the drill bit) consists of sensors, a power supply, a signal conditioning and transmitter board, and a radio-frequency (RF) coaxial cable. The up-hole subsystem consists of a battery pack/coil, pickup coil, receiver, and personal computer. The system is compatible with fluid miser drill pipe, a directional drilling technique that uses minimal drilling fluids and generates little to no secondary waste. In EMWD, downhole sensors are located behind the drill bit and linked by a high-speed data transmission system to a computer at the surface. Sandia-developed Windowstrademark-based software is used for data display and storage. As drilling is conducted, data is collected on the nature and extent of contamination, enabling on-the-spot decisions regarding drilling and sampling strategies. Initially, the downhole sensor consisted of a simple gamma radiation detector, a Geiger-Mueller tube (GMT). The design includes data assurance techniques to increase safety by reducing the probability of giving a safe indication when an unsafe condition exists. The EMWD system has been improved by the integration of a Gamma Ray Spectrometer (GRS) in place of the GMT. The GRS consists of a sodium iodide

  13. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1991-04-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from released to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and, environmental pathways and dose estimates

  14. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1992-06-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates

  15. Environmentally Responsible Aviation Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Created in 2009 as part of NASA's Aeronautics Research Mission Directorate's Integrated Systems Research Program, the Environmentally Responsible Aviation...

  16. Make-up wells drilling cost in financial model for a geothermal project

    Science.gov (United States)

    Oktaviani Purwaningsih, Fitri; Husnie, Ruly; Afuar, Waldy; Abdurrahman, Gugun

    2017-12-01

    After commissioning of a power plant, geothermal reservoir will encounter pressure decline, which will affect wells productivity. Therefore, further drilling is carried out to enhance steam production. Make-up wells are production wells drilled inside an already confirmed reservoir to maintain steam production in a certain level. Based on Sanyal (2004), geothermal power cost consists of three components, those are capital cost, O&M cost and make-up drilling cost. The make-up drilling cost component is a major part of power cost which will give big influence in a whole economical value of the project. The objective of this paper it to analyse the make-up wells drilling cost component in financial model of a geothermal power project. The research will calculate make-up wells requirements, drilling costs as a function of time and how they influence the financial model and affect the power cost. The best scenario in determining make-up wells strategy in relation with the project financial model would be the result of this research.

  17. Lower crustal section of the Oman Ophiolite drilled in Hole GT1A, ICDP Oman Drilling Project

    Science.gov (United States)

    Umino, S.; Kelemen, P. B.; Matter, J. M.; Coggon, J. A.; Takazawa, E.; Michibayashi, K.; Teagle, D. A. H.

    2017-12-01

    Hole GT1A (22° 53.535'N, 58° 30.904'E) was drilled by the Oman Drilling Project (OmDP) into GT1A of the Samail ophiolite, Oman. OmDP is an international collaboration supported by the International Continental Scientific Drilling Program, the Deep Carbon Observatory, NSF, IODP, JAMSTEC, and the European, Japanese, German and Swiss Science Foundations, with in-kind support in Oman from the Ministry of Regional Municipalities and Water Resources, Public Authority of Mining, Sultan Qaboos University, and the German University of Technology. Hole GT1A was diamond cored in 22 Jan to 08 Feb 2017 to a total depth of 403.05 m. The outer surfaces of the cores were imaged and described on site before being curated, boxed and shipped to the IODP drill ship Chikyu, where they underwent comprehensive visual and instrumental analysis. Hole GT1A drilled the lower crustal section in the southern Oman Ophiolite and recovered 401.52 m of total cores (99.6% recovery). The main lithology is dominated by olivine gabbro (65.9%), followed in abundance by olivine-bearing gabbro (21.5%) and olivine melagabbro (3.9%). Minor rock types are orthopyroxene-bearing olivine gabbro (2.4%), oxide-bearing olivine gabbro (1.5%), gabbro (1.1%), anorthositic gabbro (1%), troctolitic gabbro (0.8%); orthopyroxene-bearing gabbro (0.5%), gabbronorite (0.3%); and dunite (0.3%). These rocks are divided into Lithologic Unit I to VII at 26.62 m, 88.16 m, 104.72 m, 154.04 m, 215.22 m, 306.94 m in Chikyu Curated Depth in descending order; Unit I and II consist of medium-grained olivine gabbro with lower olivine abundance in Unit II. Unit III is medium-grained olivine melagabbros, marked by an increase in olivine. Unit IV is relatively homogenous medium-grained olivine gabbros with granular textures. Unit V is identified by the appearance of fine-grained gabbros, but the major rocktypes are medium grained olivine gabbros. Unit VI is medium-grained olivine gabbro, marked by appearance of orthopyroxene. Unit VII

  18. Numerical modelling for quantitative environmental risk assessment for the disposal of drill cuttings and mud

    Science.gov (United States)

    Wahab, Mohd Amirul Faiz Abdul; Shaufi Sokiman, Mohamad; Parsberg Jakobsen, Kim

    2017-10-01

    To investigate the fate of drilling waste and their impacts towards surrounding environment, numerical models were generated using an environmental software; MIKE by DHI. These numerical models were used to study the transportation of suspended drill waste plumes in the water column and its deposition on seabed in South China Sea (SCS). A random disposal site with the model area of 50 km × 25 km was selected near the Madalene Shoal in SCS and the ambient currents as well as other meteorological conditions were simulated in details at the proposed location. This paper was focusing on sensitivity study of different drill waste particle characteristics on impacts towards marine receiving environment. The drilling scenarios were obtained and adapted from the oil producer well at offshore Sabah (Case 1) and data from actual exploration drilling case at Pumbaa location (PL 469) in the Norwegian Sea (Case 2). The two cases were compared to study the effect of different drilling particle characteristics and their behavior in marine receiving environment after discharged. Using the Hydrodynamic and Sediment Transport models simulated in MIKE by DHI, the variation of currents and the behavior of the drilling waste particles can be analyzed and evaluated in terms of multiple degree zones of impacts.

  19. Gas supply for independent power projects: Drilling programs and reserve acquisitions

    International Nuclear Information System (INIS)

    Lambert, J.D.; Walker, R.K.

    1990-01-01

    Developers of gas-fired independent power projects, although drawn to gas as the fuel of choice for economic and environmental reasons, are finding the problem of cost-effective gas supply to be intractable. By one estimate, there are $6 billion worth of gas-fired projects languishing in the planning stage for want of long-term gas supply that is acceptable to project lenders. Worse still, as the authors are aware, some currently operating gas-fired projects lack such a supply, thus forcing the developer to rely on the spot market for gas as an interim (and unsatisfactory) solution. Although spot market prices in the deregulated natural gas industry have remained relatively low over several years, long-term gas supply has become problematic, particularly for power projects whose economics typically require an assured supply at a determined price over a multiyear period. In short, while there is an increasing demand for gas as a preferred source of fuel supply for power projects, there are discontinuities in the approaches taken to contracting for that supply by producers and developers. These concern primarily allocation of the risk of commodity-driven price increases during the term of the fuel supply contract. Without a means of accommodating price-related risk, the parties will inevitably find themselves at an impasse in contract negotiations. If there is a barrier to the independent power generation industry's vertical integration into gas production, it is the fundamental insularity of the two industries. As they have discovered, it may be indispensable for gas producers and power developers to employ intermediaries familiar with both industries in order to consummate appropriate joint-venture drilling programs and reserve acquisitions. Given the economic consequences of doing so successfully, however, they believe such programs and acquisitions may become an integral part of independent power developers' business strategy in the 1990s and beyond

  20. Considerations for the Estimation of the Risk of Environmental Contamination Due to Blow Out in Offshore Exploratory Drilling Projects; Consideraciones a la Estimación del Riesgo de Contaminación Ambiental por Blow Out en Proyectos de Perforación de Sondeos Exploratorios Offshore

    Energy Technology Data Exchange (ETDEWEB)

    Hurtado, A.; Eguilior, S.; Recreo, F.

    2015-07-01

    From the consideration of a contemporary society based on the need of a high-level complex technology with a high intrinsic level of uncertainty and its relationship with risk assessment, this analysis, conducted in late 2014, was developed from that that led the Secretary of State for the Environment to the Resolution of 29 May 2014, by which the Environmental Impact Statement of the Exploratory Drilling Project in the hydrocarbons research permits called ''Canarias 1-9// was set out and published in the Spanish Official State Gazette number 196 on 13rd August 2014. The aim of the present study is to analyze the suitability with which the worst case associated probability is identified and defined and its relation to the total risk estimate from a blow out. Its interest stems from the fact that all risk management methodologically rests on two pillars, i.e., on a sound risk analysis and evaluation. This determines the selection of management tools in relation to its level of complexity, the project phase and its potential impacts on the health, safety and environmental contamination dimensions.

  1. The "DREAM" IODP project to drill the Mediterranean Salt Giant on the Balearic Promontory

    Science.gov (United States)

    Lofi, Johanna; Camerlenghi, Angelo; Aloisi, Giovanni; Maillard, Agnès; Garcia-Castellanos, Daniel; Huebscher, Christian; Kuroda, Junichiro

    2017-04-01

    Salt giants preserving kilometer-thick evaporite layers are the sedimentary expression of extreme environmental events of global relevance. Despite their global occurrence and general importance on Earth, there is currently no complete stratigraphic record through an un-deformed salt giant of marine origin. Similarly, there is a significant lack of knowledge about the factors controlling salt giants deposition, their early evolution, the impact they exert on the isostatic response of continental margins and on sub-salt formations, and the unprecedented deep biosphere they may harbor. The Mediterranean Messinian salt giant, which formed 5.5 Myrs ago, is one of the youngest salt giant on Earth and is currently lying below the Plio-Quaternary cover in a relatively un-deformed state close to its original depositional configuration. This salt giant is thus accessible by drilling and forms an ideal case study that could be used as a reference for older salt giants. However, since its discovery in 1970 during the DSDP Leg XIII, and despite 40 years or multi-disciplinary researches, this salt giant is still not fully understood and remains one of the longest-living controversies in Earth Science. In this context, the IODP DREAM project aims at exploring the Mediterranean salt giant by drilling with the JOIDES Resolution a transect of 4 sites on the southern margin of the Balearic promontory (Western Mediterranean). We identified this area as likely the only place in the Mediterranean where we could implement a shallow-to-deep transect of non-riser drilling sites. Due to the geological history and pre-structuration of the Promontory, MSC deposits are found preserved in a series of sedimentary basins lying at different water depths between the present-day coastline and the deep central salt basins. DREAM thus offers a unique opportunity to sample several hundred of meters of material forming the Mediterranean salt giant in varied water depths. This unique sedimentary record

  2. Engineering report on drilling in the Sand Wash Basin intermediate grade project

    International Nuclear Information System (INIS)

    1980-09-01

    The Sand Wash Basin Intermediate Grade Drilling Project was conducted by Bendix Field Engineering Corporation in support of the US Department of Energy (DOE) National Uranium Resource Evaluation (NURE) program. This project consisted of 19 drill holes ranging in depth from 275 to 1220 feet (83.9 to 372.1 m). A total of 11,569 feet (3528.5 m) was rotary drilled and 130 feet (39.7 m) were cored for a total of 11,699 feet (3568.2 m) for the project. The project objective was to provide comprehensive subsurface geologic data relevant to Intermediate Grade uranium mineralization of the Browns Park Formation in the Sugar Loaf Peak Site A, and the Little Juniper Mountain Site B areas. All boreholes are located on the USGS Juniper Hot Springs and the Lay 7.5-Minute Series (Topographic) Quadrangles. The project began May 2, 1980; drilling was completed June 3, 1980. Site restoration and clean up was initiated immediately upon the completion of the last borehole and was completed June 8, 1980

  3. Project for Offshore Horizontal Directional Drilling (HDD for Pipeline Crossing in Bukit Tua, Indonesia

    Directory of Open Access Journals (Sweden)

    Yusuf Sofyan

    2016-09-01

    Full Text Available Horizontal Directional Drilling (HDD is commonly associated with well exploration activity, onshore road crossing, nearshore pipeline installation, and offshore pipeline crossing which requires precise alignment of two barges from one to the other. Here, the purpose of this study was to show one of the projects that was successfully performed on December 2013 for the Bukit Tua Project in East Java, Indonesia costing USD 8 Million. From this project experience, there are 6 Best Practices in HDD Offshore Project for Pipeline Crossing Application (first in region which will serve as a guide to future projects in replicating similar success. Out from 6 Best practices, there are two main recipes for success of HDD offshore for offshore crossings which are the drilling fluid also known as mud, and the Gyro Steering Tool (GST. First, mud parameter varies on case by case basis depending on the soil condition at the location where HDD will be performed. Failure to maintain the above parameters may result in catastrophic failure whereby the bore hole may collapse and pipe may get stuck underneath the seabed. Secondly, the beauty of GST is extremely accurate and unaffected by other metal anomalies during drilling process, thus ensuring the curve profile and direction of drilling are as per design throughout the whole process.

  4. Environmental Measurement-While-Drilling system for real-time field screening of contaminants

    International Nuclear Information System (INIS)

    Lockwood, G.J.; Normann, R.A.; Bishop, L.B.; Floran, R.J.; Williams, C.V.

    1995-01-01

    Sampling during environmental drilling is essential to fully characterize the spatial distribution and migration of near surface contaminants. However, the analysis of these samples is not only expensive, but can take weeks or months when sent to an off-site laboratory. In contrast, measurement-while-drilling (MWD) screening capability could save money and valuable time by quickly distinguishing between contaminated and uncontaminated areas. Real-time measurements provided by a MVM system would enable on-the-spot decisions to be made regarding sampling strategies, enhance worker safety, and provide the added flexibility of being able to ''steer'' the drill bit in or out hazardous zones. During measurement-while-drilling, down-hole sensors are located behind the drill bit and linked by a rapid data transmission system to a computer at the surface. As drilling proceeds, data are collected on the nature and extent of the subsurface contamination in real-time. The down-hole sensor is a Geiger-Mueller tube (GMT) gamma radiation detector. In addition to the GMT signal, the MWD system monitors these required down-hole voltages and two temperatures associated with the detector assembly. The Gamma Ray Detection System (GRDS) and electronics package are discussed in as well as the results of the field test. Finally, our conclusions and discussion of future work are presented

  5. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates. Progress is discussed

  6. Phase 2 Reese River Geothermal Project Slim Well 56-4 Drilling and Testing

    Energy Technology Data Exchange (ETDEWEB)

    Henkle, William R.; Ronne, Joel

    2008-06-15

    This report covers the drilling and testing of the slim well 56-4 at the Reese River Geothermal Project in Lander County, Nevada. This well was partially funded through a GRED III Cooperative Funding Agreement # DE-FC36-04GO14344, from USDOE.

  7. Drilling in areas subject to environmental protection; A perfuracao em area de protecao ambiental

    Energy Technology Data Exchange (ETDEWEB)

    Mendonca, Ricardo Teixeira; Guimaraes, Antimio Santos [PETROBRAS, XX (Brazil). Distrito de Perfuracao do Nordeste. Div. Tecnica; Santana, Manoel Messias de [PETROBRAS, XX (Brazil). Regiao de Producao do Nordeste. Setor de Seguranca Industrial

    1990-12-31

    This paper presents the practices developed for pollution control in areas subject to environmental protection. This well drilling operation was carried out in the Municipality of Marechal Deodoro, in the State of Alagoas, in locality named Massagueira. We stress the preventive methods for liquid and solid effluent generation and the use of Closed Fluid System or Anti-Dike System. (author) 3 figs.

  8. Geologic summary of the Owens Valley drilling project, Owens and Rose Valleys, Inyo County, California

    International Nuclear Information System (INIS)

    Schaer, D.W.

    1981-07-01

    The Owens Valley Drilling Project consists of eight drill holes located in southwest Inyo County, California, having an aggregate depth of 19,205 feet (5853 m). Project holes penetrated the Coso Formation of upper Pliocene or early Pleistocene age and the Owens Lake sand and lakebed units of the same age. The project objective was to improve the reliability of uranium-potential-resource estimates assigned to the Coso Formation in the Owens Valley region. Uranium-potential-resource estimates for this area in $100 per pound U 3 O 8 forward-cost-category material have been estimatd to be 16,954 tons (15,384 metric tons). This estimate is based partly on project drilling results. Within the Owens Valley project area, the Coso Formation was encountered only in the Rose Valley region, and for this reason Rose Valley is considered to be the only portion of the project area favorable for economically sized uranium deposits. The sequence of sediments contained in the Owens Valley basin is considered to be largely equivalent but lithologically dissimilar to the Coso Formation of Haiwee Ridge and Rose Valley. The most important factor in the concentration of significant amounts of uranium in the rock units investigated appears to be the availability of reducing agents. Significant amounts of reductants (pyrite) were found in the Coso Formation. No organic debris was noted. Many small, disconnected uranium occurrences, 100 to 500 ppM U 3 O 8 , were encountered in several of the holes

  9. Esmeralda Energy Company, Final Scientific Technical Report, January 2008. Emigrant Slimhole Drilling Project, DOE GRED III

    Energy Technology Data Exchange (ETDEWEB)

    Deymonaz, John [Fish Lake Green Power Co. (United States); Hulen, Jeffrey B. [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geosciences Inst.; Nash, Gregory D. [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geosciences Inst.; Schriener, Alex [Earth Systems Southwest (United States)

    2008-01-22

    The Emigrant Slimhole Drilling Project (ESDP) was a highly successful, phased resource evaluation program designed to evaluate the commercial geothermal potential of the eastern margin of the northern Fish Lake Valley pull-apart basin in west-central Nevada. The program involved three phases: (1) Resource evaluation; (2) Drilling and resource characterization; and (3) Resource testing and assessment. Efforts included detailed geologic mapping; 3-D modeling; compilation of a GIS database; and production of a conceptual geologic model followed by the successful drilling of the 2,938 foot deep 17-31 slimhole (core hole), which encountered commercial geothermal temperatures (327⁰ F) and exhibits an increasing, conductive, temperature gradient to total depth; completion of a short injection test; and compilation of a detailed geologic core log and revised geologic cross-sections. Results of the project greatly increased the understanding of the geologic model controlling the Emigrant geothermal resource. Information gained from the 17-31 core hole revealed the existence of commercial temperatures beneath the area in the Silver Peak Core Complex which is composed of formations that exhibit excellent reservoir characteristics. Knowledge gained from the ESDP may lead to the development of a new commercial geothermal field in Nevada. Completion of the 17-31 core hole also demonstrated the cost-effectiveness of deep core drilling as an exploration tool and the unequaled value of core in understanding the geology, mineralogy, evolutional history and structural aspects of a geothermal resource.

  10. The snake geothermal drilling project. Innovative approaches to geothermal exploration

    Energy Technology Data Exchange (ETDEWEB)

    Shervais, John W. [Utah State Univ., Logan, UT (United States); Evans, James P. [Utah State Univ., Logan, UT (United States); Liberty, Lee M. [Boise State Univ., ID (United States); Schmitt, Douglas R. [University of Alberta, Canada; Blackwell, David D. [Southern Methodist Univ., Dallas, TX (United States)

    2014-02-21

    The goal of our project was to test innovative technologies using existing and new data, and to ground-truth these technologies using slim-hole core technology. The slim-hole core allowed us to understand subsurface stratigraphy and alteration in detail, and to correlate lithologies observed in core with surface based geophysical studies. Compiled data included geologic maps, volcanic vent distribution, structural maps, existing well logs and temperature gradient logs, groundwater temperatures, and geophysical surveys (resistivity, magnetics, gravity). New data included high-resolution gravity and magnetic surveys, high-resolution seismic surveys, three slimhole test wells, borehole wireline logs, lithology logs, water chemistry, alteration mineralogy, fracture distribution, and new thermal gradient measurements.

  11. Hotspot: the Snake River Geothermal Drilling Project--initial report

    Science.gov (United States)

    Shervais, J.W.; Nielson, D.; Lachmar, T.; Christiansen, E.H.; Morgan, L.; Shanks, Wayne C.; Delahunty, C.; Schmitt, D.R.; Liberty, L.M.; Blackwell, D.D.; Glen, J.M.; Kessler, J.A.; Potter, K.E.; Jean, M.M.; Sant, C.J.; Freeman, T.

    2012-01-01

    The Snake River volcanic province (SRP) overlies a thermal anomaly that extends deep into the mantle; it represents one of the highest heat flow provinces in North America. The primary goal of this project is to evaluate geothermal potential in three distinct settings: (1) Kimama site: inferred high sub-aquifer geothermal gradient associated with the intrusion of mafic magmas, (2) Kimberly site: a valley-margin setting where surface heat flow may be driven by the up-flow of hot fluids along buried caldera ringfault complexes, and (3) Mountain Home site: a more traditional fault-bounded basin with thick sedimentary cover. The Kimama hole, on the axial volcanic zone, penetrated 1912 m of basalt with minor intercalated sediment; no rhyolite basement was encountered. Temperatures are isothermal through the aquifer (to 960 m), then rise steeply on a super-conductive gradient to an estimated bottom hole temperature of ~98°C. The Kimberly hole is on the inferred margin of a buried rhyolite eruptive center, penetrated rhyolite with intercalated basalt and sediment to a TD of 1958 m. Temperatures are isothermal at 55-60°C below 400 m, suggesting an immense passive geothermal resource. The Mountain Home hole is located above the margin of a buried gravity high in the western SRP. It penetrates a thick section of basalt and lacustrine sediment overlying altered basalt flows, hyaloclastites, and volcanic sediments, with a TD of 1821 m. Artesian flow of geothermal water from 1745 m depth documents a power-grade resource that is now being explored in more detail. In-depth studies continue at all three sites, complemented by high-resolution gravity, magnetic, and seismic surveys, and by downhole geophysical logging.

  12. Stratigraphy, climate and downhole logging data - an example from the ICDP Dead Sea deep drilling project

    Science.gov (United States)

    Coianiz, Lisa; Ben-Avraham, Zvi; Lazar, Michael

    2017-04-01

    During the late Quaternary a series of lakes occupied the Dead Sea tectonic basin. The sediments that accumulated within these lakes preserved the environmental history (tectonic and climatic) of the basin and its vicinity. Most of the information on these lakes was deduced from exposures along the marginal terraces of the modern Dead Sea, e.g. the exposures of the last glacial Lake Lisan and Holocene Dead Sea. The International Continental Drilling Program (ICDP) project conducted in the Dead Sea during 2010-2011 recovered several cores that were drilled in the deep depocenter of the lake (water depth of 300 m) and at the margin (depth of 3 m offshore Ein Gedi spa). New high resolution logging data combined with a detailed lithological description and published age models for the deep 5017-1-A borehole were used to establish a sequence stratigraphic framework for the Lakes Amora, Samra, Lisan and Zeelim strata. This study presents a stratigraphic timescale for reconstructing the last ca 225 ka. It provides a context within which the timing of key sequence surfaces identified in the distal part of the basin can be mapped on a regional and stratigraphic time frame. In addition, it permitted the examination of depositional system tracts and related driving mechanisms controlling their formation. The sequence stratigraphic model developed for the Northern Dead Sea Basin is based on the identification of sequence bounding surfaces including: sequence boundary (SB), transgressive surface (TS) and maximum flooding surface (MFS). They enabled the division of depositional sequences into a Lowstand systems tracts (LST), Transgressive systems tracts (TST) and Highstand systems tracts (HST), which can be interpreted in terms of relative lake level changes. The analysis presented here show that system tract stacking patterns defined for the distal 5017-1-A borehole can be correlated to the proximal part of the basin, and widely support the claim that changes in relative lake

  13. Archive of Core and Site/Hole Data and Photographs from the Deep Sea Drilling Project (DSDP)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Deep Sea Drilling Project (DSDP) operated the D/V GLOMAR CHALLENGER from 1968-1983, drilling 1,112 holes at 624 sites worldwide. The DSDP was funded by the US...

  14. Drilling trends in the nineties

    International Nuclear Information System (INIS)

    1993-01-01

    At a conference on various aspects of well drilling in the 1990s, papers were presented on drilling waste management, well completion and workovers, drilling fluids, drilling rig equipment and design, drilling mechanics, drill stem testing and materials, cementing, business management, health and safety, environmental issues, and directional drilling technology. Separate abstracts have been prepared for 46 papers from this conference

  15. Design and results of the Mariano Lake-Lake Valley drilling project, Northwestern New Mexico

    International Nuclear Information System (INIS)

    Kirk, A.R.; Huffman, A.C. Jr.; Zech, R.S.

    1986-01-01

    This drilling project included 12 holes along a north-south-trending line from Mariano Lake to Lake Valley, New Mexico, near the southern margin of the San Juan basin. Of a total 33,075 ft (10,088m) drilled, 4,550 ft (1,388m) were cored in the stratigraphic interval that included the basal part of the Dakota Sandstone, the Brushy Basin and Westwater Canyon Members of the Morrison Formation, and the upper part of the Recapture Member of the Morrison Formation. The project objectives were (1) to provide cores and geophysical logs for study of the sedimentology, petrography, geochemistry, and mineralization in the uranium-bearing Westwater Canyon Member; (2) to provide control for a detailed seismic study of Morrison stratigraphy and basement structures; (3) to define and correlate the stratigraphy of Cretaceous coal-bearing units; (4) to supply background data for studies of ground-water flow pattern and ground-water quality; and (5) to provide data to aid resource assessment or uranium and coal. The project design included selection of (1) drill-hole locations to cross known ore and depositional trends in the Morrison Formation; (2) a coring interval to include the uranium-bearing unit and adjacent units; geophysical logs for lithologic correlations, quantitative evaluation of uranium mineralization, qualitative detection of coal beds, preparation of synthetic seismograms, and magnetic susceptibility studies of alteration in the Morrison; and (3) a high-salinity mud program to enhance core recovery

  16. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  17. Environmental restoration project configuration control

    International Nuclear Information System (INIS)

    Hutterman, L.L.

    1991-01-01

    This paper provides an overview of the approach that Westinghouse Idaho Nuclear Company, Inc. (WINCO) is using for the implementation of the configuration control requirements for a major system acquisition under the guidance of US Department of Energy (DOE) Order 4700.1, open-quotes Project Management System,close quotes for environmental restoration. The two major features of the WINCO environmental restoration approach relate to (1) the product and (2) the maintenance of the baseline for many sites in different phases at the same time. Historically, a project has typically produced a product. Environmental restoration in some ways produces no typical project product. Essentially, what is produced and what configuration control management is exercised on is one of the following: (1) the development of clean dirt, (2) the documentation to support clean dirt, or (3) the track record of each of the sites. It is the latter approach that this paper deals with. This approach is unique in that there are four baselines [cost, schedule, scope, and technical (the track record product)] rather than the typical three. This is essential in configuration management due to the lack of a uniquely identifiable product for each site. Essentially, the philosophy behind the four-part configuration controls allows the technical baseline to fulfill the function typically met by the identifiable product

  18. Archaeological survey and monitoring of initial excavations within the basalt waste isolation project reference repository location and associated drill borehole site locations

    International Nuclear Information System (INIS)

    McCarthy, M.M.

    1984-01-01

    This letter report concerns cultural resources studies undertaken in November 1982 for the exploratory shaft starter hole and surface facilities for the Basalt Waste Isolation Project (BWIP). These studies were carried out under the provisions of the National Environmental Policy Act, the amended National Historic Preservation Act, and the Archaeological Resources Act. This report concludes that neither cultural nor palentological resources are being affected by the BWIP during the present phase of construction work and test drilling. 4 refs., 10 figs

  19. Fault Zone Resistivity Structure and Monitoring at the Taiwan Chelungpu Drilling Project (TCDP

    Directory of Open Access Journals (Sweden)

    Chih-Wen Chiang

    2008-01-01

    Full Text Available The Taiwan Chelungpu-fault drilling project (TCDP has undertaken scientific drilling and directly sampled the sub-surface rupture of the 1999 Chi-Chi earthquake. Audio-magnetotelluric (AMT measurements were used to investigate electrical resistivity structure at the TCDP site from 2004 - 2006. These data show a geoelectric strike direction of N15°E to N30°E. Inversion and forward modeling of the AMT data were used to generate a 1-D resistivity model that has a prominent low resistivity zone (< 10 ohm-m between depths of 1100 and 1500 m. When combined with porosity measurements, theAMT measurements imply that the ground water has a resistivity of 0.55 ohm-m at the depth of the fault zone.

  20. Environmental impacts of wind-energy projects

    National Research Council Canada - National Science Library

    Committee on Environmental Impacts of Wind Energy Projects; National Research Council; Division on Earth and Life Studies; National Research Council

    2007-01-01

    .... Environmental Impacts of Wind-Energy Projects offers an analysis of the environmental benefits and drawbacks of wind energy, along with an evaluation guide to aid decision-making about projects...

  1. Innovative techniques cut costs in wetlands drilling

    International Nuclear Information System (INIS)

    Navarro, A.R.

    1991-01-01

    This paper reports on an approach to drilling oil and gas wells in sensitive wetlands areas contributed to a savings of over $1.2 million on a three-well, $3 million drilling project in south Louisiana. ARCO Oil and Gas Co. drilled a three-well project in the Bayou Sale field with a truck-mounted workover rig and a modified solids-control system. This smaller equipment eliminated the need to build a large location in the marsh. Traditional drilling techniques require a large drillsite to accommodate all the equipment of a modern drilling complex. However, recently imposed environmental regulations substantially limit, and in some cases prohibit, the use of these conventional techniques for drilling wells in wetlands areas. Based on the potentially huge economic and operational impact on the drilling industry because of these stricter regulations, alternatives to these traditional practices are essential

  2. InnovaRig, a new drilling concept for research drilling projects of GeoForschungsZentrum (GFZ) Potsdam; InnovaRig - ein neues Bohranlagenkonzept fuer Forschungsbohrungen des GeoForschungsZentrum (GFZ) Potsdam

    Energy Technology Data Exchange (ETDEWEB)

    Wohlgemuth, L.; Prevedel, B. [GFZ Potsdam (Germany); Binder, J. [Herrenknecht Vertical GmbH, Schwanau (Germany); Mueller Ruhe, W. [H. Anger' s Soehne mbH, Hessisch Lichtenau (Germany); Wundes, B. [World Wide Drilling Consultants, Gladbeck (Germany)

    2007-09-13

    The world-wide experience in scientific drilling projects gained by GFZ has shown that there is no commercial drilling system that meets all technical requirements of either geoscientific or geotechnical projects. Research must therefore be done on a flexible and economical drilling system for special applications. GFZ Potsdam is therefore developing an optimized drilling system for a depth of up to 5000 m, in a joint R + D project with the industrial partners Herrenknecht-Vertical GmbH, a subsidiary of Herrenknecht AG (Schwanau), and H. Anger's Soehne Bohr- und Brunnenbaugesellschaft mbH (Hessisch-Lichtenau). (orig.)

  3. Integrated core-log interpretation of Wenchuan earthquake Fault Scientific Drilling project borehole 4 (WFSD-4)

    Science.gov (United States)

    Konaté, Ahmed Amara; Pan, Heping; Ma, Huolin; Qin, Zhen; Traoré, Alhouseiny

    2017-08-01

    Understanding slip behavior of active fault is a fundamental problem in earthquake investigations. Well logs and cores data provide direct information of physical properties of the fault zones at depth. The geological exploration of the Wenchuan earthquake Scientific Fault drilling project (WFSD) targeted the Yingxiu-Beichuan fault and the Guanxian Anxian fault, respectively. Five boreholes (WFSD-1, WFSD-2, WFSD-3P WFSD-3 and WFSD-4) were drilled and logged with geophysical tools developed for the use in petroleum industry. WFSD-1, WFSD-2 and WFSD-3 in situ logging data have been reported and investigated by geoscientists. Here we present for the first time, the integrated core-log studies in the Northern segment of Yingxiu-Beichuan fault (WFSD-4) thereby characterizing the physical properties of the lithologies(original rocks), fault rocks and the presumed slip zone associated with the Wenchuan earthquake. We also present results from the comparison of WFSD-4 to those obtained from WFSD-1, WFSD-3 and other drilling hole in active faults. This study show that integrated core-log study would help in understanding the slip behavior of active fault.

  4. Listvenite logging on D/V CHIKYU: Hole BT1B, Oman Drilling Project

    Science.gov (United States)

    Kelemen, P. B.; Beinlich, A.; Morishita, T.; Greenberger, R. N.; Johnson, K. T. M.; Lafay, R.; Michibayashi, K.; Harris, M.; Phase I Science Party, T. O. D. P.

    2017-12-01

    Listvenite, quartz-carbonate altered ultramafic rock containing minor fuchsite (Cr-muscovite) forms by complete carbonation of peridotite and is thus an attractive objective for carbon mitigation studies. However, reaction controls and evolution of listvenite are still enigmatic. Here we present the first results of Phase 1 of the ICDP (International Continental Drilling Program) Oman Drilling Project and subsequent core logging using the analytical facilities on board the research vessel D/V CHIKYU. Hole BT1B contains 300 m of continuous drill core intersecting alluvium, listvenite-altered serpentinite, serpentinite, ophicarbonate and the underlying metamorphic sole of the Semail ophiolite, Oman. The drill core has been systematically investigated by visual core description, thin section petrography, X-ray fluorescence core logging, X-ray diffractometry, visible-shortwave infrared imaging spectroscopy and X-ray Computer Tomography. Our observations show that listvenite is highly variable in texture and color on the mm to m scale. Listvenite was visually categorized into 5 principal color groups: the dominant dark red (47 %), light red (19 %), orange (14 %), pale (2 %) and green (16 %). The presence of hematite/goethite results in dark reddish, red and orange hues. Light grey or pale colored listvenite lacks hematite and/or goethite veins and may represent the `true' listvenite. Green listvenite is characterized by the presence of cm-sized quartz-fuchsite intergrowths. Five zones of serpentinite, which vary in thickness between several tens of cm and 4 m, are intercalated within the massive listvenite of Hole BT1B. Gradational listvenite-serpentinite transition zones contain the ophicarbonate assemblage (magnesite + serpentine) and sometimes additional talc, representing intermediate carbonation reaction progress. Preservation of the former mesh texture and bastite after orthopyroxene in the listvenite suggest that the listvenite precursor had already been

  5. The Wunstorf Drilling Project: Coring a Global Stratigraphic Reference Section of the Oceanic Anoxic Event 2

    Directory of Open Access Journals (Sweden)

    Markus Wilmsen

    2007-03-01

    Full Text Available The Wunstorf drilling project aims at establishing a high resolution stable isotope record for the black shale succession (OAE 2 of the CTBI and developing this into a globally applicable high resolutionbio- and chemostratigraphic reference section. Disciplines involved include micropaleontology (calcareous nannofossils, planktonic foraminifera, macropaleontology (ammonites, inoceramids, stable isotopes and cyclostratigraphy mainly based on borehole logging, multisensor core logging, and x-ray flflfluorescence (XRF scanning data. The combination of geochemical, paleontological, and logging data will allow high resolution chemo- and biostratigraphy for the CTBI which may in the future serve as an international standard.

  6. Preliminary geologic framework developed for a proposed environmental monitoring study of a deep, unconventional Marcellus Shale drill site, Washington County, Pennsylvania

    Science.gov (United States)

    Stamm, Robert G.

    2018-06-08

    BackgroundIn the fall of 2011, the U.S. Geological Survey (USGS) was afforded an opportunity to participate in an environmental monitoring study of the potential impacts of a deep, unconventional Marcellus Shale hydraulic fracturing site. The drill site of the prospective case study is the “Range Resources MCC Partners L.P. Units 1-5H” location (also referred to as the “RR–MCC” drill site), located in Washington County, southwestern Pennsylvania. Specifically, the USGS was approached to provide a geologic framework that would (1) provide geologic parameters for the proposed area of a localized groundwater circulation model, and (2) provide potential information for the siting of both shallow and deep groundwater monitoring wells located near the drill pad and the deviated drill legs.The lead organization of the prospective case study of the RR–MCC drill site was the Groundwater and Ecosystems Restoration Division (GWERD) of the U.S. Environmental Protection Agency. Aside from the USGS, additional partners/participants were to include the Department of Energy, the Pennsylvania Geological Survey, the Pennsylvania Department of Environmental Protection, and the developer Range Resources LLC. During the initial cooperative phase, GWERD, with input from the participating agencies, drafted a Quality Assurance Project Plan (QAPP) that proposed much of the objectives, tasks, sampling and analytical procedures, and documentation of results.Later in 2012, the proposed cooperative agreement between the aforementioned partners and the associated land owners for a monitoring program at the drill site was not executed. Therefore, the prospective case study of the RR–MCC site was terminated and no installation of groundwater monitoring wells nor the collection of nearby soil, stream sediment, and surface-water samples were made.Prior to the completion of the QAPP and termination of the perspective case study the geologic framework was rapidly conducted and nearly

  7. The Iceland Deep Drilling Project (IDDP): (I) Status and Future Plans.

    Science.gov (United States)

    Elders, W. A.; Fridleifsson, G. O.; Bird, D. K.; Schiffman, P.; Zierenberg, R.; Reed, M. H.

    2006-12-01

    drilling. The industrial consortium will fund the >20 million USD cost of drilling and the US National Science Foundation and the International Continental Scientific Drilling Program will jointly fund the coring and sampling for scientific studies. Research by a team of approximately 50 scientists from seven countries is underway; the US investigators are reporting some initial studies at Reykjanes and Krafla in a series of accompanying papers. In the coming decade the IDDP will drill a series of deep holes in Icelandic geothermal fields, including a return to the seawater system at Reykjanes. In addition to exploring for new sources of energy, this project will provide the first opportunity worldwide to investigate the coupling of hydrothermal and magmatic processes in volcanic systems on a mid-ocean ridge. This will allow a broad array of scientific studies involving water/rock reactions at high temperatures. Supercritical fluids have greatly enhanced rates of mass transfer and chemical reaction. Active processes in such deep high-temperature reaction zones that control fluid compositions on mid-ocean ridges have never before been available for such comprehensive direct sampling and study.

  8. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  9. Paleomagnetism of the Oman Ophiolite: New Results from Oman Drilling Project Cores

    Science.gov (United States)

    Horst, A. J.; Till, J. L.; Koornneef, L.; Usui, Y.; Kim, H.; Morris, A.

    2017-12-01

    The Oman Drilling Project drilled holes at four sites in a transect through the southern massifs of the Samail ophiolite, and recovered 1500 m of igneous and metamorphic rocks. We focus on three sites from the oceanic crustal section including lower layered gabbros (GT1A), the mid-crustal layered to foliated gabbro transition (GT2A), and the shallower transition from sheeted dikes to varitextured gabbros (GT3A). Detailed core descriptions, analyses, and paleomagnetic measurements, were made on D/V Chikyu from July to September 2017 to utilize the core laboratory facilities similar to IODP expeditions. Shipboard measurements included anisotropy of magnetic susceptibility (AMS) and alternating field and thermal demagnetization of 597 discrete samples. Sample demagnetization behavior is varied from each of the cores, with some revealing multiple components of magnetization, and others yielding nearly univectorial data. The interpretation of results from the lower crustal cores is complicated by the pervasive presence of secondary magnetite. In almost all samples, a stable component was resolved (interpreted as a characteristic remanent magnetization) after removal of a lower-coercivity or lower unblocking-temperature component. The inclinations of the stable components in the core reference frame are very consistent in Hole GT1A. However, a transition from negative to positive inclinations in GT2A suggests some structural complexity, possibly as a result of intense late faulting activity. Both abrupt and gradual transitions between multiple zones of negative and positive inclinations occur in Hole GT3A. Interpretation and direct comparison of remanence between drill sites is difficult as recovered core pieces currently remain azimuthally unoriented, and GT2A was drilled at a plunge of 60°, whereas GT1A and GT3A were both drilled vertically. Work is ongoing to use borehole imagery to reorient the core pieces and paleomagnetic data into a geographic in situ reference

  10. Thermal regime of the State 2-14 well, Salton Sea Scientific Drilling Project

    Science.gov (United States)

    Sass, J.H.; Priest, S.S.; Duda, L.E.; Carson, C.C.; Hendricks, J.D.; Robison, L.C.

    1988-01-01

    Temperature logs were made repeatedly during breaks in drilling and both during and after flow tests in the Salton Sea Scientific Drilling Project well (State 2-14). The purpose of these logs was to assist in identifying zones of fluid loss or gain and to characterize reservoir temperatures. At the conclusion of the active phase of the project, a series of logs was begun in an attempt to establish the equilibrium temperature profile. Thermal gradients decrease from about 250 mK m-1 in the upper few hundred meters to just below 200 mK m-1 near the base of the conductive cap. Using one interpretation, thermal conductivities increase with depth (mainly because of decreasing porosity), resulting in component heat flows that agree reasonably well with the mean of about 450 mW m-2. This value agrees well with heat flow data from the shallow wells within the Salton Sea geothermal field. A second interpretation, in which measured temperature coefficients of quartz- and carbonate-rich rocks are used to correct thermal conductivity, results in lower mean conductivities that are roughly constant with depth and, consequently, systematically decreasing heat flux averaging about 350 mW m-2 below 300 m. This interpretation is consistent with the inference (from fluid inclusion studies) that the rocks in this part of the field were once several tens of degrees Celsius hotter than they are now. The age of this possible disturbance is estimated at a few thousand years. -from Authors

  11. A magnetotelluric profile across the German Deep Drilling Project (KTB) area: Two- and three-dimensional modeling results

    Czech Academy of Sciences Publication Activity Database

    Eisel, M.; Haak, V.; Pek, Josef; Červ, Václav

    2001-01-01

    Roč. 106, B8 (2001), s. 16061-16073 ISSN 0148-0227 R&D Projects: GA ČR GA205/99/0917 Institutional research plan: CEZ:AV0Z3012916 Keywords : magnetotelluric profile * KTB * German Deep Drilling Project Subject RIV: DE - Earth Magnetism, Geodesy, Geography Impact factor: 2.609, year: 2001

  12. Environmental performance, mechanical and microstructure analysis of concrete containing oil-based drilling cuttings pyrolysis residues of shale gas.

    Science.gov (United States)

    Wang, Chao-Qiang; Lin, Xiao-Yan; He, Ming; Wang, Dan; Zhang, Si-Lan

    2017-09-15

    The overall objective of this research project is to investigate the feasibility of incorporating oil-based drilling cuttings pyrolysis residues (ODPR) and fly ash serve as replacements for fine aggregates and cementitious materials in concrete. Mechanical and physical properties, detailed environmental performances, and microstructure analysis were carried out. Meanwhile, the early hydration process and hydrated products of ODPR concrete were analyzed with X-ray diffraction (XRD), Fourier transform infrared (FT-IR), scanning electron microscopy (SEM) and energy-dispersive X-ray spectroscopy (EDX). The results indicated that ODPR could not be categorize into hazardous wastes. ODPR had specific pozzolanic characteristic and the use of ODPR had certain influence on slump and compressive strength of concrete. The best workability and optimal compressive strength were achieved with the help of 35% ODPR. Environmental performance tests came to conclusion that ODPR as recycled aggregates and admixture for the preparation of concrete, from the technique perspective, were the substance of mere environmental contamination. Copyright © 2017 Elsevier B.V. All rights reserved.

  13. The ICDP Snake River Geothermal Drilling Project: preliminary overview of borehole geophysics

    Science.gov (United States)

    Schmitt, Douglas R.; Liberty, Lee M.; Kessler, James E.; Kuck, Jochem; Kofman, Randolph; Bishop, Ross; Shervais, John W.; Evans, James P.; Champion, Duane E.

    2012-01-01

    Hotspot: The Snake River Geothermal Drilling Project was undertaken to better understand the geothermal systems in three locations across the Snake River Plain with varying geological and hydrological structure. An extensive series of standard and specialized geophysical logs were obtained in each of the wells. Hydrogen-index neutron and γ-γ density logs employing active sources were deployed through the drill string, and although not fully calibrated for such a situation do provide semi-quantitative information related to the ‘stratigraphy’ of the basalt flows and on the existence of alteration minerals. Electrical resistivity logs highlight the existence of some fracture and mineralized zones. Magnetic susceptibility together with the vector magnetic field measurements display substantial variations that, in combination with laboratory measurements, may provide a tool for tracking magnetic field reversals along the borehole. Full waveform sonic logs highlight the variations in compressional and shear velocity along the borehole. These, together with the high resolution borehole seismic measurements display changes with depth that are not yet understood. The borehole seismic measurements indicate that seismic arrivals are obtained at depth in the formations and that strong seismic reflections are produced at lithological contacts seen in the corresponding core logging. Finally, oriented ultrasonic borehole televiewer images were obtained over most of the wells and these correlate well with the nearly 6 km of core obtained. This good image log to core correlations, particularly with regards to drilling induced breakouts and tensile borehole and core fractures will allow for confident estimates of stress directions and or placing constraints on stress magnitudes. Such correlations will be used to orient in core orientation giving information useful in hydrological assessments, paleomagnetic dating, and structural volcanology.

  14. Iberian Pyrite Belt Subsurface Life (IPBSL), a drilling project in a geochemical Mars terrestrial analogue

    Science.gov (United States)

    Amils, R.; Fernández-Remolar, D. C.; Parro, V.; Manfredi, J. A.; Timmis, K.; Oggerin, M.; Sánchez-Román, M.; López, F. J.; Fernández, J. P.; Omoregie, E.; Gómez-Ortiz, D.; Briones, C.; Gómez, F.; García, M.; Rodríguez, N.; Sanz, J. L.

    2012-09-01

    Iberian Pyrite Belt Subsurface Life (IPBSL) is a drilling project specifically designed to characterize the subsurface ecosystems operating in the Iberian Pyrite Belt (IPB), in the area of Peña de Hierro, and responsible of the extreme acidic conditions existing in the Rio Tinto basin [1]. Rio Tinto is considered a good geochemical terrestrial analogue of Mars [2, 3]. A dedicated geophysical characterization of the area selected two drilling sites (4) due to the possible existence of water with high ionic content (low resistivity). Two wells have been drilled in the selected area, BH11 and BH10, of depths of 340 and 620 meters respectively, with recovery of cores and generation of samples in anaerobic and sterile conditions. Preliminary results showed an important alteration of mineral structures associated with the presence of water, with production of expected products from the bacterial oxidation of pyrite (sulfates and ferric iron). Ion chromatography of water soluble compounds from uncontaminated samples showed the existence of putative electron donors (ferrous iron, nitrite in addition of the metal sulfides), electron acceptors (sulfate, nitrate, ferric iron) as well as variable concentration of metabolic organic acids (mainly acetate, formate, propionate and oxalate), which are strong signals of the presence of active subsurface ecosystem associated to the high sulfidic mineral content of the IPB. The system is driven by oxidants that appear to be provided by the rock matrix, only groundwater is needed to launch microbial metabolism. The geological, geomicrobiological and molecular biology analysis which are under way, should allow the characterization of this ecosystem of paramount interest in the design of an astrobiological underground Mars exploration mission in the near future.

  15. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1991-10-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doeses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates

  16. Recent drilling activities at the earth power resources Tuscarora geothermal power project's hot sulphur springs lease area.

    Energy Technology Data Exchange (ETDEWEB)

    Goranson, Colin

    2005-03-01

    Earth Power Resources, Inc. recently completed a combined rotary/core hole to a depth of 3,813 feet at it's Hot Sulphur Springs Tuscarora Geothermal Power Project Lease Area located 70-miles north of Elko, Nevada. Previous geothermal exploration data were combined with geologic mapping and newly acquired seismic-reflection data to identify a northerly tending horst-graben structure approximately 2,000 feet wide by at least 6,000 feet long with up to 1,700 feet of vertical offset. The well (HSS-2) was successfully drilled through a shallow thick sequence of altered Tertiary Volcanic where previous exploration wells had severe hole-caving problems. The ''tight-hole'' drilling problems were reduced using drilling fluids consisting of Polymer-based mud mixed with 2% Potassium Chloride (KCl) to reduce Smectite-type clay swelling problems. Core from the 330 F fractured geothermal reservoir system at depths of 2,950 feet indicated 30% Smectite type clays existed in a fault-gouge zone where total loss of circulation occurred during coring. Smectite-type clays are not typically expected at temperatures above 300 F. The fracture zone at 2,950 feet exhibited a skin-damage during injection testing suggesting that the drilling fluids may have caused clay swelling and subsequent geothermal reservoir formation damage. The recent well drilling experiences indicate that drilling problems in the shallow clays at Hot Sulphur Springs can be reduced. In addition, average penetration rates through the caprock system can be on the order of 25 to 35 feet per hour. This information has greatly reduced the original estimated well costs that were based on previous exploration drilling efforts. Successful production formation drilling will depend on finding drilling fluids that will not cause formation damage in the Smectite-rich fractured geothermal reservoir system. Information obtained at Hot Sulphur Springs may apply to other geothermal systems developed in

  17. Poplar Island Environmental Restoration Project Nekton Data

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Poplar Island Environmental Restoration Project (PIERP) is a large scale 1,800 acres restoration project located in mid Chesapeake Bay. Fishery collections are...

  18. Summary geologic report on the Missoula/Bitterroot Drilling Project, Missoula/Bitterroot Basins, Montana

    International Nuclear Information System (INIS)

    Abramiuk, I.N.

    1980-08-01

    The objective of the drilling project was to obtain information to assess the favorability of the Tertiary sedimentary units in the Missoula and Bitterroot Valleys for uranium potential. The group of Montana Tertiary basins, including the Missoula and Bitterroot Basins, has been assigned a speculative uranium potential of 46,557 tons of U 3 O 8 at $100/lb by the 1980 National Uranium Resource Evaluation report. The seven drill holes, two in the Missoula Valley and five in the Bitterroot Valley, verified observations made during surface studies and provided additional information about the subsurface that was previously unknown. No uranium was found, although of the two localities the Bitterroot Valley is the more favorable. Three stratigraphic units were tentatively identified on the basis of lithology: pre-Renova clastic units, Renova Formation equivalents, and Sixmile Creek Formation equivalents. Of the three, the Renova Formation equivalents in the Bitterroot Valley appear to be the most favorable for possible uranium occurrences and the pre-Renova clastic units the least favorable

  19. Integrated Approach to Drilling Project in Unconventional Reservoir Using Reservoir Simulation

    Science.gov (United States)

    Stopa, Jerzy; Wiśniowski, Rafał; Wojnarowski, Paweł; Janiga, Damian; Skrzypaszek, Krzysztof

    2018-03-01

    Accumulation and flow mechanisms in unconventional reservoir are different compared to conventional. This requires a special approach of field management with drilling and stimulation treatments as major factor for further production. Integrated approach of unconventional reservoir production optimization assumes coupling drilling project with full scale reservoir simulation for determine best well placement, well length, fracturing treatment design and mid-length distance between wells. Full scale reservoir simulation model emulate a part of polish shale - gas field. The aim of this paper is to establish influence of technical factor for gas production from shale gas field. Due to low reservoir permeability, stimulation treatment should be direct towards maximizing the hydraulic contact. On the basis of production scenarios, 15 stages hydraulic fracturing allows boost gas production over 1.5 times compared to 8 stages. Due to the possible interference of the wells, it is necessary to determine the distance between the horizontal parts of the wells trajectories. In order to determine the distance between the wells allowing to maximize recovery factor of resources in the stimulated zone, a numerical algorithm based on a dynamic model was developed and implemented. Numerical testing and comparative study show that the most favourable arrangement assumes a minimum allowable distance between the wells. This is related to the volume ratio of the drainage zone to the total volume of the stimulated zone.

  20. Preliminary analysis of downhole logging data from ICDP Lake Junin drilling Project, Peru

    Science.gov (United States)

    Pierdominici, Simona; Kück, Jochem; Rodbell, Donald T.; Abbott, Mark B.

    2016-04-01

    The International Continental Drilling Programm (ICDP) has supported a scientific drilling campaign in Peru during the summer season 2015. The Lake Junin Drilling Project mainly aims at obtaining high-resolution paleoclimate records from lacustrine sediments to reconstruct the history of the continental records covering the glacial-interglacial cycles. Lake Junín is located at 4000 m a.s.l. in the tropical Andes of Peru, and is characterized by a thick (> 125 m) sediment package deposited at a high rate (0.2 to 1.0 mm yr-1). Lake Junín is one of the few lakes in the tropical Andes that predates the maximum extent of glaciation and is in a geomorphic position to record the waxing and waning of glaciers in nearby cordillera, hence making the lake a key site for the investigation of the Quaternary climate evolution in the inner-tropics of the Southern Hemisphere. Continous coring was performed at three sites in overall 11 boreholes on the lake with at least two overlapping boreholes per site to avoid core gaps. The depth of the boreholes varied between approx. 30 m and 110 m depending on the drill site. The core bit had a bit size of 122.6 mm and yielded a core diameter of 85 mm. Upon completion of coring operations downhole geophysical logging was performed in five of the 11 boreholes (1A, 1C, 1D, 2A and 3B) by the Operational Support Group of ICDP. The main objective was to record in-situ the physical properties of the lacustrine sediments of Lake Junin. Downhole logs provide a powerful tool to fill in information at intervals with core gaps and as depth reference for depth matching of the discontinous cores. Furthermore it will be used for the lithological reconstruction and interpretation. The OSG downhole logging comprised total and spectrum gamma ray, magnetic susceptibility, borehole geometry, temperature, and sonic P-wave velocity. Unstable and collapsing borehole walls made it neccessary to carry out logging in several sections instead of in one run. The

  1. Oman Drilling Project GT3 site survey: dynamics at the roof of an oceanic magma chamber

    Science.gov (United States)

    France, L.; Nicollet, C.; Debret, B.; Lombard, M.; Berthod, C.; Ildefonse, B.; Koepke, J.

    2017-12-01

    Oman Drilling Project (OmanDP) aims at bringing new constraints on oceanic crust accretion and evolution by drilling Holes in the whole ophiolite section (mantle and crust). Among those, operations at GT3 in the Sumail massif drilled 400 m to sample the dike - gabbro transition that corresponds to the top (gabbros) and roof (dikes) of the axial magma chamber, an interface where hydrothermal and magmatic system interacts. Previous studies based on oceanic crust formed at present day fast-spreading ridges and preserved in ophiolites have highlighted that this interface is a dynamic horizon where the axial melt lens that top the main magma chamber can intrude, reheat, and partially assimilate previously hydrothermally altered roof rocks. Here we present the preliminary results obtained in GT3 area that have allowed the community to choose the drilling site. We provide a geological and structural map of the area, together with new petrographic and chemical constraints on the dynamics of the dike - gabbro transition. Our new results allow us to quantify the dynamic processes, and to propose that 1/ the intrusive contact of the varitextured gabbro within the dikes highlights the intrusion of the melt lens top in the dike rooting zone, 2/ both dikes and previously crystallized gabbros are reheated, and recrystallized by underlying melt lens dynamics (up to 1050°C, largely above the hydrous solidus temperature of altered dikes and gabbros), 3/ the reheating range can be > 200°C, 4/ the melt lens depth variations for a given ridge position is > 200m, 5/ the reheating stage and associated recrystallization within the dikes occurred under hydrous conditions, 6/ the reheating stage is recorded at the root zone of the sheeted dike complex by one of the highest stable conductive thermal gradient ever recorded on Earth ( 3°C/m), 7/ local chemical variations in recrystallized dikes and gabbros are highlighted and used to quantify crystallization and anatectic processes, and the

  2. Paleoenvironments, Evolution, and Geomicrobiology in a Tropical Pacific Lake: The Lake Towuti Drilling Project (TOWUTI)

    Science.gov (United States)

    Vogel, Hendrik; Russell, James M.; Bijaksana, Satria; Crowe, Sean; Fowle, David; Haffner, Douglas; King, John; Marwoto, Ristiyanti; Melles, Martin; von Rintelen, Thomas; Stevenson, Janelle; Watkinson, Ian; Wattrus, Nigel

    2014-05-01

    Lake Towuti (2.5°S, 121°E) is a, 560 km2, 200-m deep tectonic lake at the downstream end of the Malili lake system, a set of five, ancient (1-2 MYr) tectonic lakes in central Sulawesi, Indonesia. Lake Towuti's location in central Indonesia provides a unique opportunity to reconstruct long-term paleoclimate change in a crucially important yet understudied region- the Indo-Pacific warm pool (IPWP), heart of the El Niño-Southern Oscillation. The Malili Lakes have extraordinarily high rates of floral and faunal endemism, and the lakes are surrounded by one of the most diverse tropical forests on Earth. Drilling in Lake Towuti will identify the age and origin of the lake and the environmental and climatic context that shaped the evolution of this unique lacustrine and terrestrial ecosystem. The ultramafic (ophiolitic) rocks and lateritic soils surrounding Lake Towuti provide metal substrates that feed a diverse, exotic microbial community, analogous to the microbial ecosystems that operated in the Archean Oceans. Drill core will provide unique insight into long-term changes in this ecosystem, as well as microbial processes operating at depth in the sediment column. High-resolution seismic reflection data (CHIRP and airgun) combined with numerous long sediment piston cores collected from 2007-2013 demonstrate the enormous promise of Lake Towuti for an ICDP drilling campaign. Well-stratified sequences of up to 150 m thickness, uninterrupted by unconformities or erosional truncation, are present in multiple sub-basins within Towuti, providing ideal sites for long-term environmental, climatic, and limnological reconstructions. Multiproxy analyses of our piston cores document a continuous and detailed record of moisture balance variations in Lake Towuti during the past 60 kyr BP. In detail our datasets show that wet conditions and rainforest ecosystems in central Indonesia persisted during Marine Isotope Stage 3 (MIS3) and the Holocene, and were interrupted by severe

  3. Environmental aspect of oil and water-based drilling muds and ...

    African Journals Online (AJOL)

    Administrator

    2010-03-19

    Mar 19, 2010 ... both oil based and water-based drilling wastes collected from the same depth were analyzed for metals. (iron, copper ... include well cuttings, drilling muds, formation water, cement slurry ..... in the drill wastes (2.38 mg/kg) (Figure 3d). The water .... Organization, International Programme on Chemical Safety.

  4. The Saskatchewan Environmental Assessment Act Guide to Proposal Development : oil and natural gas projects

    International Nuclear Information System (INIS)

    1999-02-01

    The manner in which requests for review of oil and natural gas projects are to be provided under the Environmental Assessment Act in Saskatchewan is described. The provisions of the Guide apply to all seismic projects on private or Crown lands, all drilling projects, flowline projects, access routes and production facilities on any land, except where the project is on cultivated land where it does not interfere with water bodies or endangered species. It also applies to any project that has the potential to meet the definition of 'development' under the Environmental Assessment Act. Basically, the following information is required for all proposals: (1) project description, (2) project evaluation, (3) description of proposed waste management practices, and (4) description of the proposed environmental monitoring. 4 refs

  5. The Heidelberg Basin Drilling Project - Sedimentology and Stratigraphy of the Quaternary succession

    Science.gov (United States)

    Ellwanger, Dietrich; Gabriel, Gerald; Hahne, Jürgen; Hoselmann, Christian; Menzies, John; Simon, Theo; Weidenfeller, Michael; Wielandt-Schuster, Ulrike

    2010-05-01

    Within the context of the Heidelberg Basin Drilling Project (Gabriel et al. 2008), a detailed sediment succession is presented here based upon deep drillings taken at Heidelberg UniNord and Mannheim Käfertal. Sediment structures, and micromorphological and pollen analyses were conducted and used to reconsider some of the climate transitions within the lower Pleistocene. A new and novel scenario is postulated regarding the preservation of Quaternary sediment packages within the Cenozoic Graben environment of the Heidelberg basin. The palynological evidence comprises the periods of warm climate of the Holsteinian (mainly Abies (fir), some Fagus (beech), Pterocarya & Azolla); the Cromerian (Pinus-Picea-QM (pine-spruce-QM)); the Bavelian (Abies, Tsuga (hemlock fir), QM & phases of increased NAP including Pinus); the Waalian (Abies, Tsuga, QM); and the Tiglian (Fagus & early Pleistocene taxa especially Sciadopytis, downward increasing Tertiary taxa). The sediment package was studied both macroscopically and microscopically. Both techniques provide evidence of fluvial, lacustrine and mass movement sedimentary processes. Some include evidence of periglacial processes (silt droplets within fine grained sands indicative of frozen ground conditions). The periglacial structures are often, not always, accompanied by pollen spectra dominated by pine and NAP. E.g. the Tiglian part of the succession shows periglacial sediment structures at its base and top but not in its middle sections. I.e. it appears not as a series of warm and cold phases but rather as a constant warm period with warm-cold-alternations at its bottom and top. All results illustrate sediment preservation in the Heidelberg basin almost throughout the Quaternary. This may be due to tectonic subsidence, but also to compaction by sediment loading of underlying fine sediments (Oligocene to Quaternary) leading to incomplete but virtually continuous sediment preservation (Tanner et al. 2009). References Gabriel, G

  6. High Resolution Mineral Mapping of the Oman Drilling Project Cores with Imaging Spectroscopy: Preliminary Results

    Science.gov (United States)

    Greenberger, R. N.; Ehlmann, B. L.; Kelemen, P. B.; Manning, C. E.; Teagle, D. A. H.; Harris, M.; Michibayashi, K.; Takazawa, E.

    2017-12-01

    The Oman Drilling Project provides an unprecedented opportunity to study the formation and alteration of oceanic crust and peridotite. Key to answering the main questions of the project are a characterization of the primary and secondary minerals present within the drill core and their spatial relationships. To that end, we used the Caltech imaging spectrometer system to scan the entire 1.5-km archive half of the core from all four gabbro and listvenite boreholes (GT1A, GT2A, GT3A, and BT1B) at 250 µm/pixel aboard the JAMSTEC Drilling Vessel Chikyu during the ChikyuOman core description campaign. The instrument measures the visible and shortwave infrared reflectance spectra of the rocks as a function of wavelength from 0.4 to 2.6 µm. This wavelength range is sensitive to many mineral groups, including hydrated minerals (phyllosilicates, zeolites, amorphous silica polytypes), carbonates, sulfates, and transition metals, most commonly iron-bearing mineralogies. To complete the measurements, the core was illuminated with a halogen light source and moved below the spectrometer at 1 cm/s by the Chikyu's Geotek track. Data are corrected and processed to reflectance using measurements of dark current and a spectralon calibration panel. The data provide a unique view of the mineralogy at high spatial resolution. Analysis of the images for complete downhole trends is ongoing. Thus far, a variety of minerals have been identified within their petrologic contexts, including but not limited to magnesite, dolomite, calcite, quartz (through an Si-OH absorption due to minor H2O), serpentine, chlorite, epidote, zeolites, mica (fuchsite), kaolinite, prehnite, gypsum, amphibole, and iron oxides. Further analysis will likely identify more minerals. Results include rapidly distinguishing the cations present within carbonate minerals and identifying minerals of volumetrically-low abundance within the matrix and veins of core samples. This technique, for example, accurately identifies

  7. Modeling in support of Corridor Resources Old Harry exploratory drilling environmental assessment

    International Nuclear Information System (INIS)

    2011-10-01

    During offshore petroleum activities, oil spills can occur and lead to significant environmental impacts. Corridor Resources Inc. is in the process of obtaining a license for exploratory drilling activities in the Old Harry and the aim of this study is to determine what would be the behavior and trajectory of any oil spill from these activities. Two types of spill were studied, sub-sea and surface spills. Modeling was carried out using Cohasset oil from the Scotian Basin, the properties of which are thought to be close to those of Old Harry oil, and the blowout rates were determined using reservoir information. Results showed that subsea blowouts would result in wide and thin surface slicks near the source while surface blowouts would be narrow and thick; surface slicks would persist over a 5km range from the source before dispersion.

  8. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  9. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1990-12-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have been have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. 3 figs., 3 tabs

  10. Determination of In-situ Rock Thermal Properties from Geophysical Log Data of SK-2 East Borehole, Continental Scientific Drilling Project of Songliao Basin, NE China

    Science.gov (United States)

    Zou, C.; Zhao, J.; Zhang, X.; Peng, C.; Zhang, S.

    2017-12-01

    Continental Scientific Drilling Project of Songliao Basin is a drilling project under the framework of ICDP. It aims at detecting Cretaceous environmental/climate changes and exploring potential resources near or beneath the base of the basin. The main hole, SK-2 East Borehole, has been drilled to penetrate through the Cretaceous formation. A variety of geophysical log data were collected from the borehole, which provide a great opportunity to analyze thermal properties of in-situ rock surrounding the borehole.The geothermal gradients were derived directly from temperature logs recorded 41 days after shut-in. The matrix and bulk thermal conductivity of rock were calculated with the geometric-mean model, in which mineral/rock contents and porosity were required as inputs (Fuchs et. al., 2014). Accurate mineral contents were available from the elemental capture spectroscopy logs and porosity data were derived from conventional logs (density, neutron and sonic). The heat production data were calculated by means of the concentrations of uranium, thorium and potassium determined from natural gamma-ray spectroscopy logs. Then, the heat flow was determined by using the values of geothermal gradients and thermal conductivity.The thermal parameters of in-situ rock over the depth interval of 0 4500m in the borehole were derived from geophysical logs. Statistically, the numerical ranges of thermal parameters are in good agreement with the measured values from both laboratory and field in this area. The results show that high geothermal gradient and heat flow exist over the whole Cretaceous formation, with anomalously high values in the Qingshankou formation (1372.0 1671.7m) and the Quantou formation (1671.7 2533.5m). It is meaningful for characterization of geothermal regime and exploration of geothermal resources in the basin. Acknowledgment: This work was supported by the "China Continental Scientific Drilling Program of Cretaceous Songliao Basin (CCSD-SK)" of China

  11. Chew Bahir: A Key Site within the Hominin Sites and Paleolakes Drilling Project, towards a Half Million-Year Climate Record from Southern Ethiopia

    Science.gov (United States)

    Schaebitz, F.; Asrat, A.; Lamb, H. F.; Trauth, M. H.; Foerster, V. E.; Junginger, A.; Raub, T. D.; Gromig, R.; Viehberg, F. A.; Roberts, H. M.; Cohen, A.

    2015-12-01

    Chew Bahir, a saline mudflat today, is one of the five sites in East Africa, drilled within the framework of HSPDP (Hominin Site and Paleolakes Drilling Project). It is also one of the key sites of the Collaborative Research Centre (CRC-806) "Our way to Europe" aiming at the reconstruction of environmental conditions in the source region of modern man (H. sapiens). It is suggested that a changing environment could have triggered the mobility and dispersal of modern man. The oldest known fossils of anatomical modern humans (~195 ka BP) were found in the Omo basin, not more than 90km westwards of our drill site. The deposits in the tectonic basin of Chew Bahir in southern Ethiopia were cored in Nov. 2014 in two boreholes down to 280 m and 260 m below surface respectively. The overlapping long cores (drilled ~20 m apart from each other), were opened, scanned, described and sampled in low resolution in April 2015. The recovered sediments mostly contain green-greyish to light coloured and brown to reddish clays and silty clays, interbedded with some laminated mica-rich sand layers and occurrences of carbonate concretions and nodules, which decrease upcore. Here we will present a first set of results on the composite core, comprising mainly lithology and magnetic susceptibility (MS). Based on known sedimentation rates from pre-studies performed on short cores across the basin, we anticipate the deep drilled cores to cover at least 500 ka BP. Moreover, new insights into the role of post-depositional alteration, especially of clay minerals and zeolites, will be presented as a contribution to an improved understanding of formation processes. The results support the identification of wet and dry climate periods in the past. Those pronounced variations of moisture availability, are thought to have influenced the evolution and mobility of Homo sapiens sapiens.

  12. Environmental projects. Volume 3: Environmental compliance audit

    Science.gov (United States)

    1987-01-01

    The Goldstone Deep Space Communications Complex is part of NASA's Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. Activities at Goldstone are carried out in support of six large parabolic dish antennas. In support of the national goal of the preservation of the environment and the protection of human health and safety, NASA, JPL and Goldstone have adopted a position that their operating installations shall maintain a high level of compliance with Federal, state, and local laws governing the management of hazardous substances, abestos, and underground storage tanks. A JPL version of a document prepared as an environmental audit of Goldstone operations is presented. Both general and specific items of noncompliance at Goldstone are identified and recommendations are provided for corrective actions.

  13. First Results from HOTSPOT: The Snake River Plain Scientific Drilling Project, Idaho, U.S.A.

    Directory of Open Access Journals (Sweden)

    John W. Shervais

    2013-03-01

    Full Text Available HOTSPOT is an international collaborative effort to understand the volcanic history of the Snake River Plain (SRP. The SRP overlies a thermal anomaly, the Yellowstone-Snake River hotspot, that is thought to represent a deep-seated mantle plume under North America. Theprimary goal of this project is to document the volcanic and stratigraphic history of the SRP, which represents the surface expression of this hotspot, and to understand how it affected the evolution of continental crust and mantle. An additional goal is to evaluate the geothermal potential of southern Idaho.Project HOTSPOT has completed three drill holes. (1 The Kimama site is located along the central volcanic axis of the SRP; our goal here was to sample a long-term record of basaltic volcanism in the wake of the SRP hotspot. (2 The Kimberly site is located near the margin of the plain; our goal here was to sample a record of high-temperaturerhyolite volcanism associated with the underlying plume. This site was chosen to form a nominally continuous record of volcanism when paired with the Kimama site. (3 The Mountain Home site is located in the western plain; our goal here was to sample the Pliocene-Pleistocene transition in lake sediments at this site and to sample older basalts that underlie the sediments.We report here on our initial results for each site, and on some of the geophysical logging studies carried out as part of this project.

  14. Trans-Amazon Drilling Project (TADP): origins and evolution of the forests, climate, and hydrology of the South American tropics

    Science.gov (United States)

    Baker, P. A.; Fritz, S. C.; Silva, C. G.; Rigsby, C. A.; Absy, M. L.; Almeida, R. P.; Caputo, M.; Chiessi, C. M.; Cruz, F. W.; Dick, C. W.; Feakins, S. J.; Figueiredo, J.; Freeman, K. H.; Hoorn, C.; Jaramillo, C.; Kern, A. K.; Latrubesse, E. M.; Ledru, M. P.; Marzoli, A.; Myrbo, A.; Noren, A.; Piller, W. E.; Ramos, M. I. F.; Ribas, C. C.; Trnadade, R.; West, A. J.; Wahnfried, I.; Willard, D. A.

    2015-12-01

    This article presents the scientific rationale for an ambitious ICDP drilling project to continuously sample Late Cretaceous to modern sediment in four different sedimentary basins that transect the equatorial Amazon of Brazil, from the Andean foreland to the Atlantic Ocean. The goals of this project are to document the evolution of plant biodiversity in the Amazon forests and to relate biotic diversification to changes in the physical environment, including climate, tectonism, and the surface landscape. These goals require long sedimentary records from each of the major sedimentary basins across the heart of the Brazilian Amazon, which can only be obtained by drilling because of the scarcity of Cenozoic outcrops. The proposed drilling will provide the first long, nearly continuous regional records of the Cenozoic history of the forests, their plant diversity, and the associated changes in climate and environment. It also will address fundamental questions about landscape evolution, including the history of Andean uplift and erosion as recorded in Andean foreland basins and the development of west-to-east hydrologic continuity between the Andes, the Amazon lowlands, and the equatorial Atlantic. Because many modern rivers of the Amazon basin flow along the major axes of the old sedimentary basins, we plan to locate drill sites on the margin of large rivers and to access the targeted drill sites by navigation along these rivers.

  15. Trans-Amazon Drilling Project (TADP): origins and evolution of the forests, climate, and hydrology of the South American tropics

    Science.gov (United States)

    Baker, P.A.; Fritz, S.C.; Silva, C.G.; Rigsby, C.A.; Absy, M.L.; Almeida, R.P.; Caputo, Maria C.; Chiessi, C.M.; Cruz, F.W.; Dick, C.W.; Feakins, S.J.; Figueiredo, J.; Freeman, K.H.; Hoorn, C.; Jaramillo, C.A.; Kern, A.; Latrubesse, E.M.; Ledru, M.P.; Marzoli, A.; Myrbo, A.; Noren, A.; Piller, W.E.; Ramos, M.I.F.; Ribas, C.C.; Trinadade, R.; West, A.J.; Wahnfried, I.; Willard, Debra A.

    2015-01-01

    This article presents the scientific rationale for an ambitious ICDP drilling project to continuously sample Late Cretaceous to modern sediment in four different sedimentary basins that transect the equatorial Amazon of Brazil, from the Andean foreland to the Atlantic Ocean. The goals of this project are to document the evolution of plant biodiversity in the Amazon forests and to relate biotic diversification to changes in the physical environment, including climate, tectonism, and the surface landscape. These goals require long sedimentary records from each of the major sedimentary basins across the heart of the Brazilian Amazon, which can only be obtained by drilling because of the scarcity of Cenozoic outcrops. The proposed drilling will provide the first long, nearly continuous regional records of the Cenozoic history of the forests, their plant diversity, and the associated changes in climate and environment. It also will address fundamental questions about landscape evolution, including the history of Andean uplift and erosion as recorded in Andean foreland basins and the development of west-to-east hydrologic continuity between the Andes, the Amazon lowlands, and the equatorial Atlantic. Because many modern rivers of the Amazon basin flow along the major axes of the old sedimentary basins, we plan to locate drill sites on the margin of large rivers and to access the targeted drill sites by navigation along these rivers.

  16. The environmental cost in the mining projects

    International Nuclear Information System (INIS)

    Gaviria Rivera Antonio

    1992-01-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence

  17. Mesoscopic Structural Observations of Cores from the Chelungpu Fault System, Taiwan Chelungpu-Fault Drilling Project Hole-A, Taiwan

    Directory of Open Access Journals (Sweden)

    Hiroki Sone

    2007-01-01

    Full Text Available Structural characteristics of fault rocks distributed within major fault zones provide basic information in understanding the physical aspects of faulting. Mesoscopic structural observations of the drilledcores from Taiwan Chelungpu-fault Drilling Project Hole-A are reported in this article to describe and reveal the distribution of fault rocks within the Chelungpu Fault System.

  18. Trans-Amazon Drilling Project (TADP) : Origins and evolution of the forests, climate, and hydrology of the South American tropics

    NARCIS (Netherlands)

    Baker, P.A.; Fritz, S.C.; Silva, C.G.; Rigsby, C.A.; Absy, M.L.; Almeida, R.P.; Caputo, M.; Chiessi, C.M.; Cruz, F.W.; Dick, C. W.; Feakins, S.J.; Figueiredo, J.; Freeman, K.H.; Hoorn, C.; Jaramillo, C.; Kern, A.K.; Latrubesse, E.M.; Ledru, M.P.; Marzoli, A.; Myrbo, A.; Noren, A.; Piller, W.E.; Ramos, M.I.F.; Ribas, C.C.; Trnadade, R.; West, A.J.; Wahnfried, I.; Willard, D.A.

    2015-01-01

    This article presents the scientific rationale for an ambitious ICDP drilling project to continuously sample Late Cretaceous to modern sediment in four different sedimentary basins that transect the equatorial Amazon of Brazil, from the Andean foreland to the Atlantic Ocean. The goals of this

  19. The ``Adopt A Microbe'' project: Web-based interactive education connected with scientific ocean drilling

    Science.gov (United States)

    Orcutt, B. N.; Bowman, D.; Turner, A.; Inderbitzen, K. E.; Fisher, A. T.; Peart, L. W.; Iodp Expedition 327 Shipboard Party

    2010-12-01

    We launched the "Adopt a Microbe" project as part of Integrated Ocean Drilling Program (IODP) Expedition 327 in Summer 2010. This eight-week-long education and outreach effort was run by shipboard scientists and educators from the research vessel JOIDES Resolution, using a web site (https://sites.google.com/site/adoptamicrobe) to engage students of all ages in an exploration of the deep biosphere inhabiting the upper ocean crust. Participants were initially introduced to a cast of microbes (residing within an ‘Adoption Center’ on the project website) that live in the dark ocean and asked to select and virtually ‘adopt’ a microbe. A new educational activity was offered each week to encourage learning about microbiology, using the adopted microbe as a focal point. Activities included reading information and asking questions about the adopted microbes (with subsequent responses from shipboard scientists), writing haiku about the adopted microbes, making balloon and fabric models of the adopted microbes, answering math questions related to the study of microbes in the ocean, growing cultures of microbes, and examining the gases produced by microbes. In addition, the website featured regular text, photo and video updates about the science of the expedition using a toy microbe as narrator, as well as stories written by shipboard scientists from the perspective of deep ocean microbes accompanied by watercolor illustrations prepared by a shipboard artist. Assessment methods for evaluating the effectiveness of the Adopt a Microbe project included participant feedback via email and online surveys, website traffic monitoring, and online video viewing rates. Quantitative metrics suggest that the “Adope A Microbe” project was successful in reaching target audiences and helping to encourage and maintain interest in topics related to IODP Expedition 327. The “Adopt A Microbe” project mdel can be adapted for future oceanographic expeditions to help connect the

  20. HIGH-POWER TURBODRILL AND DRILL BIT FOR DRILLING WITH COILED TUBING

    Energy Technology Data Exchange (ETDEWEB)

    Robert Radtke; David Glowka; Man Mohan Rai; David Conroy; Tim Beaton; Rocky Seale; Joseph Hanna; Smith Neyrfor; Homer Robertson

    2008-03-31

    Commercial introduction of Microhole Technology to the gas and oil drilling industry requires an effective downhole drive mechanism which operates efficiently at relatively high RPM and low bit weight for delivering efficient power to the special high RPM drill bit for ensuring both high penetration rate and long bit life. This project entails developing and testing a more efficient 2-7/8 in. diameter Turbodrill and a novel 4-1/8 in. diameter drill bit for drilling with coiled tubing. The high-power Turbodrill were developed to deliver efficient power, and the more durable drill bit employed high-temperature cutters that can more effectively drill hard and abrasive rock. This project teams Schlumberger Smith Neyrfor and Smith Bits, and NASA AMES Research Center with Technology International, Inc (TII), to deliver a downhole, hydraulically-driven power unit, matched with a custom drill bit designed to drill 4-1/8 in. boreholes with a purpose-built coiled tubing rig. The U.S. Department of Energy National Energy Technology Laboratory has funded Technology International Inc. Houston, Texas to develop a higher power Turbodrill and drill bit for use in drilling with a coiled tubing unit. This project entails developing and testing an effective downhole drive mechanism and a novel drill bit for drilling 'microholes' with coiled tubing. The new higher power Turbodrill is shorter, delivers power more efficiently, operates at relatively high revolutions per minute, and requires low weight on bit. The more durable thermally stable diamond drill bit employs high-temperature TSP (thermally stable) diamond cutters that can more effectively drill hard and abrasive rock. Expectations are that widespread adoption of microhole technology could spawn a wave of 'infill development' drilling of wells spaced between existing wells, which could tap potentially billions of barrels of bypassed oil at shallow depths in mature producing areas. At the same time, microhole

  1. Environmental Control Unit Harness Project

    Science.gov (United States)

    Oliva-Buisson, Yvette J.

    2014-01-01

    Testing four new Environmental Control Unit Harnesses for improved user comfort during SCAPE operations. Phase I, testing in a lab environment, Phase II will continue testing the best candidates in a field environment.

  2. Environmental implications of release of oil-based drilling fluids and oily cuttings into waters of the Canadian northwest Atlantic

    Energy Technology Data Exchange (ETDEWEB)

    Barchard, W.W.; Doe, K.G.; Mahon, S.D.; Moores, R.B.; Osborne, J.M.; Parker, W.R.

    1986-01-01

    In 1982, the Environmental Protection Service became aware that companies conducting petroleum exploration in the waters of eastern Canada would request permission to use and discharge oil-based drilling fluids and/or drill cuttings contaminated with oil-based drilling fluids. It was determined from an evaluation of North Sea data that aspects of the toxicity of oil-based drilling fluids should be evaluated using techniques applicable to Canadian marine conditions. Although it is unlikely that permission will be granted to dispose of whole oil-based muds into the ocean, whole mud formulations were tested as a close approximation to the mixture which would adhere to discharged drilling cuttings. Test organisms were exposed to whole muds as an approximation of the worst possible exposure regime. Static bioassays (96-hour) were conducted using threespine stickleback (Gasterosteus aculeatus). In general, high pH and the inclusion of certain emulsifiers seemed to contribute greatly to the lethality of the whole muds. Diesel oil-based muds were more acutely toxic than those formulated with alternate base oils which were virtually non-acutely toxic. Acute, sublethal and long-term studies were also conducted only on drill cuttings contaminated with alternate base oil muds. These more closely reflect proposed discharge strategies. Although 96-hour exposures resulted in no mortality, longer-term exposures (four to thirty-two days) resulted in significant behavioural changes and/or mortality to Macoma balthica, Strongylocentrotus droebachiensis, larval Homarus americanus and Nephthys caeca. The results suggest that use of alternate oil-based drilling fluids will have an effect on the marine environment intermediate between water-based muds and diesel oil-based muds. 73 refs., 6 figs., 18 tabs.

  3. Role of Hydrogeology in Professional Environmental Projects

    Science.gov (United States)

    The purpose of this presentation is to acquaint hydrogeology students how hydrogeological principles are applied in environmental engineering projects. This presentation outlines EPA's Superfund processes of site characterization, feasibility studies, and remediation processes.

  4. Interaction between drilled shaft and mechanically stabilized earth (MSE) wall : project summary.

    Science.gov (United States)

    2015-08-31

    Drilled shafts are being constructed within the reinforced zone of mechanically stabilized earth (MSE) walls (Figure 1). The drilled shafts may be subjected to horizontal loads and push against the front of the wall. Distress of MSE wall panels has b...

  5. A review of drilled shaft sealing for the Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1981-01-01

    Questions have been raised concerning the ability of the drillers of the exploratory shaft for the Basalt Waste Isolation program to develop an effective seal against water inflow down the annular space between the shaft casing and shaft wall into the mined chambers. We understand the need for shaft integrity and the concern of those responsible for the shaft planning. The purpose of this report is to give documentation to allay the fears of those who may have questions remaining in their minds concerning the prospects for a dry shaft. Included in this report are discussions of five projects where shaft sealing was effective in drilled shafts and one project where the material which is recommended for the exploratory shaft was used effectively in a conventional shaft. Also discussed is the recommended multitier approach toward shaft sealing which will, if adopted, use all of the current state of the art techniques to assure the watertightness of the shaft. It should be pointed out that none of the projects described here used all of the safeguards which are recommended in this program. If any of the materials and procedures recommended here are omitted, then of course the possibility increases for water migration through the casing-borehole annulus. It is our considered opinion that if the program recommended is adopted there will be no water inflow into the shaft, but if we are wrong or if, through human error, the program is not executed correctly, that we have devices and procedures available to us which will facilitate remedial work to perfect seal in the shaft. 4 refs., 3 figs., 1 tab

  6. Drilling the leading edge of the mantle wedge and the underlying metamorphic sole of the Samail Ophiolite: Hole BT1B, Oman Drilling Project

    Science.gov (United States)

    Morishita, T.; Kelemen, P. B.; Coggon, J. A.; Harris, M.; Matter, J. M.; Michibayashi, K.; Takazawa, E.; Teagle, D. A. H.

    2017-12-01

    Hole BT1B (23°21.861' N, 58°10.957' E) was drilled by the Oman Drilling Project (OmDP) on the north side of Wadi Mansah in the Samail ophiolite, Oman. OmDP is an international collaboration supported by the International Continental Scientific Drilling Program, Deep Carbon Observatory, NSF, IODP, JAMSTEC, and the European, Japanese, German and Swiss Science Foundations, with in-kind support in Oman from the Ministry of Regional Municipalities and Water Resources, Public Authority of Mining, Sultan Qaboos University, and the German University of Technology. Hole BT1B was cored from 6 to 23 March 2017, to a depth of 300.05 m. The outer surfaces of the cores were imaged and described onsite before being curated, boxed and shipped to the IODP drill ship Chikyu. Hole BT1B sampled carbonated peridotite (listvenite), 2 carbonate-veined serpentinite bands at 80-100 and 180-185 m depth, a few cm of ultracataclasite and 70 cm of fault gouge at 197 m depth, followed by 103 m metamorphic sole. Onboard Chikyu, BT1B underwent X-ray computed tomography (CT) and multi-sensor logging, imaging and spectroscopy, macroscopic and thin section observations, physical properties measurements, and XRF, XRD and ICP-MS analyses. 1st authors of abstracts reporting initial results are Beinlich (matrix characteristics), de Obeso (modeling mass transfer), Godard (XRF and ICP-MS whole rock data), Greenberger (infrared spectroscopy), Johnson (XRF core scanner), Kelemen (overall petrology), Manning (veins), and Michibayashi (X-ray CT). Listvenite is composed of carbonate + quartz + Fe-oxyhydroxides, + minor relict spinel ± chromian mica (fuchsite). The mineralogy suggests formation at < 150°C. The bulk rock density is similar to that of gabbro but the P-wave velocity is generally higher. Rock textures suggest viscous deformation, while additional brittle deformation is recorded by older veins and younger breccias and faults. The metamorphic sole consists of fine-grained to microcrystalline

  7. Blue Bahia: an environmental sanitation project

    International Nuclear Information System (INIS)

    Azcona, Miguel Angel L.; Neuvirth, Bruno

    1996-01-01

    The paper presents actions developed to incorporate some aspects of environmental sanitation to the basic sanitation project, natural resources assessing, identification of the environmental degradation sources - in addition to those caused by lack of basic sanitation, and common action between public and private sectors

  8. The Hans Tausen drill

    DEFF Research Database (Denmark)

    Johnsen, Sigfus Johann; Dahl-Jensen, Dorthe; Steffensen, Jørgen Peder

    2007-01-01

    In the mid-1990s, excellent results from the GRIP and GISP2 deep drilling projects in Greenland opened up funding for continued ice-coring efforts in Antarctica (EPICA) and Greenland (NorthGRIP). The Glaciology Group of the Niels Bohr Institute, University of Copenhagen, was assigned the task...... of providing drilling capability for these projects, as it had done for the GRIP project. The group decided to further simplify existing deep drill designs for better reliability and ease of handling. The drill design decided upon was successfully tested on Hans Tausen Ice Cap, Peary Land, Greenland, in 1995....... The 5.0 m long Hans Tausen (HT) drill was a prototype for the ~11 m long EPICA and NorthGRIP versions of the drill which were mechanically identical to the HT drill except for a much longer core barrel and chips chamber. These drills could deliver up to 4 m long ice cores after some design improvements...

  9. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  10. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  11. Projects: viable alternatives in the Environmental Education?

    Directory of Open Access Journals (Sweden)

    Marcos Jose Terossi

    2011-11-01

    Full Text Available In this article we are going to develop the reflection about the projects, its genesis, its use in education and environmental education.To this end, we will promote the discussion about the so-called "method of projects" and "projects pedagogy", with a comparison between them and outlining the approach that we consider most appropriate to EA, its limits and possibilities within the critical perspective, manufacturing and emancipatory education.

  12. The Towuti Drilling Project: A new, long Pleistocene record of Indo-Pacific Climate

    Science.gov (United States)

    Russell, James M.; Vogel, Hendrik; Bijaksana, Satria; Melles, Martin

    2016-04-01

    Lake Towuti is the largest tectonic lake in Indonesia, and the longest known terrestrial sediment archive in Southeast Asia. Lake Towuti's location in central Indonesia provides an important opportunity to reconstruct long-term changes in terrestrial climate in the Western Pacific warm pool, heart of the El Niño-Southern Oscillation. Lake Towuti has extremely high rates of floral and faunal endemism and is surrounded by one of the most diverse tropical forests on Earth making it a hotspot of Southeast Asian biodiversity. The ultramafic rocks and soils surrounding Lake Towuti provide high concentrations of metals to the lake and its sediments that feed a diverse, exotic microbial community. From May - July, 2015, the Towuti Drilling Project, consisting of more than 30 scientists from eight countries, recovered over 1,000 meters of new sediment core from 3 different drill sites in Lake Towuti, including cores through the entire sediment column to bedrock. These new sediment cores will allow us to investigate the history of rainfall and temperature in central Indonesia, long-term changes in the composition of the region's rainforests and diverse aquatic ecosystems, and the micro-organisms living in Towuti's exotic, metal-rich sediments. The Indo-Pacific region plays a pivotal role in the Earth's climate system, regulating critical atmospheric circulation systems and the global concentration of atmospheric water vapor- the Earth's most important greenhouse gas. Changes in seasonal insolation, greenhouse gas concentrations, ice volume, and local sea level are each hypothesized to exert a dominant control on Indo-Pacific hydroclimate variations through the Pleistocene. Existing records from the region are short and exhibit fundamental differences and complexity in orbital-scale climate patterns that limit our understanding of the regional climate responses to climate boundary conditions. Our sediment cores, which span much of the past 1 million years, allow new tests of

  13. Alternative techniques for environmental project management

    International Nuclear Information System (INIS)

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  14. Dating of 30m ice cores drilled by Japanese Antarctic Research Expedition and environmental change study

    Science.gov (United States)

    Motoyama, H.; Suzuki, T.; Fukui, K.; Ohno, H.; Hoshina, Y.; Hirabayashi, M.; Fujita, S.

    2017-12-01

    1. Introduction It is possible to reveal the past climate and environmental change from the ice core drilled in polar ice sheet and glaciers. The 54th Japanese Antarctic Research Expedition conducted several shallow core drillings up to 30 m depth in the inland and coastal areas of the East Antarctic ice sheet. Ice core sample was cut out at a thickness of about 5 cm in the cold room of the National Institute of Polar Research, and analyzed ion, water isotope, dust and so one. We also conducted dielectric profile measurement (DEP measurement). The age as a key layer of large-scale volcanic explosion was based on Sigl et al. (Nature Climate Change, 2014). 2. Inland ice core Ice cores were collected at the NDF site (77°47'14"S, 39°03'34"E, 3754 m.a.s.l.) and S80 site (80°00'00"S, 40°30'04"E, 3622 m.a.s.l.). Dating of ice core was done as follows. Calculate water equivalent from core density. Accumulate water equivalent from the surface. Approximate the relation of depth - cumulative water equivalent by a quartic equation. We determined the key layer with nssSO42 - peak corresponding to several large volcanic explosions. The accumulation rate was kept constant between the key layers. As a result, NDF was estimated to be around 1360 AD and S80 was estimated to be around 1400 AD in the deepest ice core. 3. Coastal ice core An ice core was collected at coastal H15 sites (69°04'10"S, 40°44'51"E, 1030 m.a.s.l.). Dating of ice core was done as follows. Calculate water equivalent from ice core density. Accumulate water equivalent from the surface. Approximate the relation of depth - cumulative water equivalent by a quartic equation. Basically we decided to summer (December) and winter (June) due to the seasonal change of the water isotope (δD or δ18O). In addition to the seasonal change of isotope, confirm the following. Maximum of SO42- / Na +, which is earlier in time than the maximum of water isotope. Maximum of MSA at about the same time as the maximum of the

  15. Hominin Sites and Paleolakes Drilling Project: A 500,000-year climate record from Chew Bahir, a key site in southern Ethiopia

    Science.gov (United States)

    Foerster, Verena E.; Asrat, Asfawossen; Chapot, Melissa S.; Cohen, Andrew S.; Dean, Jonathan R.; Deino, Alan; Günter, Christina; Junginger, Annett; Lamb, Henry F.; Leng, Melanie J.; Roberts, Helen M.; Schaebitz, Frank; Trauth, Martin H.

    2017-04-01

    What is the environmental context of human evolution and dispersal? In order to evaluate the impact that different timescales and magnitude of climatic shifts have had on the living conditions of anatomically modern humans, the Hominin Sites and Paleolakes Drilling Project (HSPDP) has cored five predominantly-lacustrine sequences to investigate climate change in East Africa (Cohen et al., 2016). The five high-priority areas in Ethiopia and Kenya are located in close proximity to key paleoanthropological sites covering various steps in evolution. One of the five cores is from Chew Bahir. Chew Bahir is a deep tectonically-bound basin in the southern Ethiopian rift, close to the Lower Omo valley, site of the earliest known fossil of anatomically modern humans. As part of the deep drilling initiative between ICDP-HSPDP and the Collaborative Research Center (CRC806), the Chew Bahir sedimentary deposits were cored in late 2014, yielding in two parallel cores reaching 280 m depth and which cover the last 550 ka of environmental history. We present the initial results of on-going lithologic and stratigraphic investigation of the composite core, the results of high resolution MSCL and XRF scanning data, as well as the first results of detailed multi-proxy analysis of the Chew Bahir cores. These analyses are based on more than 14,000 discrete subsamples. An initial chronology, based on Ar/Ar and OSL dating, allows the first reconstructions of dry-wet cycles during the last 550 ka. Both geochemical and sedimentological results show that the Chew Bahir deposits are sensitive recorders of changes in moisture, sediment influx, provenance, transport and diagenetic processes. The core records will allow tests of the various hypotheses regarding the impact of climate variability -from climate flickers to orbital driven transitions- on the evolution and dispersal of anatomically modern humans. References: Cohen, A. et al., 2016. The Hominin Sites and Paleolakes Drilling Project

  16. Analysis of geophysical well logs from the Mariano Lake-Lake Valley drilling project, San Juan Basin, Northwestern New Mexico

    International Nuclear Information System (INIS)

    Scott, J.H.

    1986-01-01

    Geophysical well logs were obtained in eight deep holes drilled and cored by the U.S. Geological Survey to examine the geology of the Mariano Lake-Lake Valley area in the southern part of the San Juan basin, New Mexico. The logs were made to determine the petrophysical properties of the rocks penetrated by the holes, to aid in making stratigraphic correlations between the holes, and to estimate the grade of uranium enrichment in mineralized zones. The logs can be divided into six categories-nuclear, electric, sonic, magnetic, dipmeter, and borehole conditions. Examples of these logs are presented and related to lithological and petrophysical properties of the cores recovered. Gamma-ray and prompt fission neutron logs were used to estimate uranium grade in mineralized zones. Resistivity and spontaneous potential logs were used to make stratigraphic correlations between drill holes and to determine the variability of the sandstone:mudstone ratios of the major sedimentary units. In one drill hole a dipmeter log was used to estimate the direction of sediment transport of the fluvial host rock. Magnetic susceptibility logs provided supportive information for a laboratory study of magnetic mineral alteration in drill cores. This study was used to infer the geochemical and hydrologic environment associated with uranium deposition in the project area

  17. Fifth DOE symposium on enhanced oil and gas recovery and improved drilling technology. Volume 3. Gas and drilling

    Energy Technology Data Exchange (ETDEWEB)

    Linville, B. [ed.

    1979-01-01

    Volume 3 contains papers from the sessions on natural gas supporting research, western gas sands project, drilling technology, and environmental effects. Individuals were processed for inclusion in the Energy Data Base.

  18. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  19. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  20. South African drilling

    International Nuclear Information System (INIS)

    Anon.

    1984-01-01

    According to the president of the South African Drilling Association, the drilling industry is meeting head-on the challenges created by the worldwide recession. The paper is a synopsis of several of the papers presented at the SADA symposium and a look at several mining-related drilling projects in South Africa. These papers include grouting techniques, the use of impregnated bits in hard rock drilling, tunnel boring for mines, surveying improvement methods and the use of explosives to increase groundwater yield

  1. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  2. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE's Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES ampersand H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report

  3. The Lake Towuti Drilling Project: A New, 1-Million Year Record of Indo-Pacific Hydroclimate

    Science.gov (United States)

    Russell, J. M.; Bijaksana, S.; Vogel, H.; Melles, M.; Crowe, S.; Fajar, S. J.; Hasberg, A. K.; Ivory, S.; Kallmeyer, J.; Kelly, C. S.; Kirana, K. H.; Morlock, M.; Tamuntuan, G. H.; Wicaksono, S. A.

    2015-12-01

    ­The Indo-Pacific region plays an integral role in the Earth's climate system. Changes in local insolation, greenhouse gas concentrations, ice volume, and local sea level are each hypothesized to exert a dominant control on Indo-Pacific hydroclimate variations through the Pleistocene, yet existing records from the region are generally short and exhibit fundamental differences in orbital-scale patterns that limit our understanding of the regional climate responses to these global forcings. New paleoclimate records spanning multiple glacial-interglacial cycles are therefore required to document the region's hydroclimatic response to the full range of global climate boundary conditions observed during the late Quaternary. Lake Towuti is located in central Indonesia and is the only known terrestrial sedimentary archive in the region that spans multiple glacial-interglacial cycles. From May - July, 2015, the Towuti Drilling Project, consisting of nearly 40 scientists from eight countries, recovered over 1,000 meters of new sediment core from Lake Towuti. This includes cores though the entire sediment column to bedrock, which likely provide a >1-million-year records of regional hydroclimate. On-site borehole and sediment core logging data document major shifts in sediment composition, including transitions from lake clays to peats, calcareous sediments, and gravels. These data show excellent agreement with major lithological transitions recorded in seismic reflection data, and indicate large changes in lake levels and hydroclimate through the late Quaternary. Prior work on Lake Towuti indicated a dominant control by global ice volume on regional hydroclimate, a hypothesis we aim to test through the analysis of these new cores. This presentation will review existing records from the region and show the first long geochemical and sedimentological records from Lake Towuti to understand orbital-scale hydrologic change during the last ~1 million years.

  4. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    McMakin, A.H., Cannon, S.D.; Finch, S.M.

    1992-09-01

    The objective of the Hanford Environmental Dose Reconstruction MDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in envirorunental pathways. epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering. radiation dosimetry. and cultural anthropology. Included are appointed members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates

  5. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  6. Environmental issues of the Three Gorges project

    International Nuclear Information System (INIS)

    Fang Ziyun

    1994-01-01

    This article addresses the environmental status of the reservoir area, reservoir characteristics, and the information systems used for assessment of environmental impacts. The Three Gorges Project and the environment are examined in detail and benefits for the Yangtze River's middle reaches, the impact of inundation, and impacts on aquatic animals, human health, natural landscape, cultural relics, water temperature and quality, the river estuary, and the surrounding area are considered. (UK)

  7. Final report of the environmental measurement-while-drilling-gamma ray spectrometer system technology demonstration at the Savannah River Site F-Area Retention Basin

    Energy Technology Data Exchange (ETDEWEB)

    Lockwood, G.J.; Normann, R.A.; Williams, C.V.

    1997-08-01

    The environmental measurement-while-drilling-gamma ray spectrometer (EMWD-GRS) system represents an innovative blend of new and existing technology that provides real-time environmental and drill bit data during drilling operations. The EMWD-GRS technology was demonstrated at Savannah River Site F-Area Retention Basin. The EMWD-GRS technology demonstration consisted of continuously monitoring for gamma-radiation-producing contamination while drilling two horizontal boreholes below the backfilled retention basin. These boreholes passed near previously sampled vertical borehole locations where concentrations of contaminant levels of cesium had been measured. Contaminant levels continuously recorded by the EMWD-GRs system during drilling are compared to contaminant levels previously determined through quantitative laboratory analysis of soil samples.

  8. Final report of the environmental measurement-while-drilling-gamma ray spectrometer system technology demonstration at the Savannah River Site F-Area Retention Basin

    International Nuclear Information System (INIS)

    Lockwood, G.J.; Normann, R.A.; Williams, C.V.

    1997-08-01

    The environmental measurement-while-drilling-gamma ray spectrometer (EMWD-GRS) system represents an innovative blend of new and existing technology that provides real-time environmental and drill bit data during drilling operations. The EMWD-GRS technology was demonstrated at Savannah River Site F-Area Retention Basin. The EMWD-GRS technology demonstration consisted of continuously monitoring for gamma-radiation-producing contamination while drilling two horizontal boreholes below the backfilled retention basin. These boreholes passed near previously sampled vertical borehole locations where concentrations of contaminant levels of cesium had been measured. Contaminant levels continuously recorded by the EMWD-GRs system during drilling are compared to contaminant levels previously determined through quantitative laboratory analysis of soil samples

  9. Do environmental projects promote gender equity?

    Science.gov (United States)

    Joekes, S

    1995-02-01

    In the 1980s, governments and development agencies began to recognize the need to consider gender issues in their environmental and natural resource management programs. First came the understanding that women play a vital role in the management of natural resources and often have a strong traditional and contemporary knowledge of their environment. To exclude them would damage the efficacy of any project. Next, donor agencies came to view women, in their roles as environmental managers, as vulnerable victims of and contributors to environmental degradation. When awareness grew of examples of women successfully fighting to conserve local resources, women were considered important local assets to be used in efforts toward better environmental management. New environmental projects began by asking whether the protected resource was used by men or women in order to target the crucial people. For example, when planning to preserve forests, it is useful to recognize that men typically use wood for construction and fencing, while women use it for cooking fires. It has become increasingly common for women to participate in water and sanitation committees. But good intentions have often been subverted. Community level management of environmental projects does not guarantee female participation. Sometimes involving women means that women do all the physical labor without receiving their fair share of the benefits. In areas where women's property rights are restricted, women will have little authority in resource management. Legal reforms are needed, but they must be complemented at the local level by collective action.

  10. Gulf of Mexico Gas Hydrate Joint Industry Project Leg II logging-while-drilling data acquisition and analysis

    Science.gov (United States)

    Collett, Timothy S.; Lee, Wyung W.; Zyrianova, Margarita V.; Mrozewski, Stefan A.; Guerin, Gilles; Cook, Ann E.; Goldberg, Dave S.

    2012-01-01

    One of the objectives of the Gulf of Mexico Gas Hydrate Joint Industry Project Leg II (GOM JIP Leg II) was the collection of a comprehensive suite of logging-while-drilling (LWD) data within gas-hydrate-bearing sand reservoirs in order to make accurate estimates of the concentration of gas hydrates under various geologic conditions and to understand the geologic controls on the occurrence of gas hydrate at each of the sites drilled during this expedition. The LWD sensors just above the drill bit provided important information on the nature of the sediments and the occurrence of gas hydrate. There has been significant advancements in the use of downhole well-logging tools to acquire detailed information on the occurrence of gas hydrate in nature: From using electrical resistivity and acoustic logs to identify gas hydrate occurrences in wells to where wireline and advanced logging-while-drilling tools are routinely used to examine the petrophysical nature of gas hydrate reservoirs and the distribution and concentration of gas hydrates within various complex reservoir systems. Recent integrated sediment coring and well-log studies have confirmed that electrical resistivity and acoustic velocity data can yield accurate gas hydrate saturations in sediment grain supported (isotropic) systems such as sand reservoirs, but more advanced log analysis models are required to characterize gas hydrate in fractured (anisotropic) reservoir systems. In support of the GOM JIP Leg II effort, well-log data montages have been compiled and presented in this report which includes downhole logs obtained from all seven wells drilled during this expedition with a focus on identifying and characterizing the potential gas-hydrate-bearing sedimentary section in each of the wells. Also presented and reviewed in this report are the gas-hydrate saturation and sediment porosity logs for each of the wells as calculated from available downhole well logs.

  11. Gulf of Mexico Gas Hydrate Joint Industry Project Leg II logging-while-drilling data acquisition and anaylsis

    Science.gov (United States)

    Collett, Timothy S.; Lee, Myung W.; Zyrianova, Margarita V.; Mrozewski, Stefan A.; Guerin, Gilles; Cook, Ann E.; Goldberg, Dave S.

    2012-01-01

    One of the objectives of the Gulf of MexicoGasHydrateJointIndustryProjectLegII (GOM JIP LegII) was the collection of a comprehensive suite of logging-while-drilling (LWD) data within gas-hydrate-bearing sand reservoirs in order to make accurate estimates of the concentration of gashydrates under various geologic conditions and to understand the geologic controls on the occurrence of gashydrate at each of the sites drilled during this expedition. The LWD sensors just above the drill bit provided important information on the nature of the sediments and the occurrence of gashydrate. There has been significant advancements in the use of downhole well-logging tools to acquire detailed information on the occurrence of gashydrate in nature: From using electrical resistivity and acoustic logs to identify gashydrate occurrences in wells to where wireline and advanced logging-while-drilling tools are routinely used to examine the petrophysical nature of gashydrate reservoirs and the distribution and concentration of gashydrates within various complex reservoir systems. Recent integrated sediment coring and well-log studies have confirmed that electrical resistivity and acoustic velocity data can yield accurate gashydrate saturations in sediment grain supported (isotropic) systems such as sand reservoirs, but more advanced log analysis models are required to characterize gashydrate in fractured (anisotropic) reservoir systems. In support of the GOM JIP LegII effort, well-log data montages have been compiled and presented in this report which includes downhole logs obtained from all seven wells drilled during this expedition with a focus on identifying and characterizing the potential gas-hydrate-bearing sedimentary section in each of the wells. Also presented and reviewed in this report are the gas-hydrate saturation and sediment porosity logs for each of the wells as calculated from available downhole well logs.

  12. NPOESS Preparatory Project (NPP) Environmental Products

    Science.gov (United States)

    Grant, K. D.; Smith, D. C.

    2011-12-01

    The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). The Joint Polar Satellite System will contribute the afternoon orbit component and ground processing system of the restructured National Polar-orbiting Operational Environmental Satellite System (NPOESS). As such, the Joint Polar Satellite System replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the ground processing component of both POES and the Defense Meteorological Satellite Program (DMSP) replacement, known as the Defense Weather Satellite System (DWSS), managed by the Department of Defense (DoD). The Joint Polar Satellite System satellite will carry a suite of sensors designed to collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The ground processing system for the Joint Polar Satellite System is known as the Common Ground System (JPSS CGS), and consists of a Command, Control, and Communications Segment (C3S) and the Interface Data Processing Segment (IDPS). Both are developed by Raytheon Intelligence and Information Systems (IIS). The Interface Data Processing Segment will process Joint Polar Satellite System and Defense Weather Satellite System satellite data to provide environmental data products (aka, Environmental Data Records or EDRs) to the National Oceanic and Atmospheric Administration and Department of Defense processing centers operated by the United States government. The Interface Data Processing Segment will process Environmental Data Records beginning with the NPOESS Preparatory Project (NPP) and continue through the lifetime of the Joint Polar Satellite System and Defense Weather Satellite System programs. Under the National Polar-orbiting Operational Environmental

  13. The Hanford Environmental Dose Reconstruction Project: Overview

    International Nuclear Information System (INIS)

    Haerer, H.A.; Freshley, M.D.; Gilbert, R.O.; Morgan, L.G.; Napier, B.A.; Rhoads, R.E.; Woodruff, R.K.

    1990-01-01

    In 1988, researchers began a multiyear effort to estimate radiation doses that people could have received since 1944 at the U.S. Department of Energy's Hanford Site. The study was prompted by increasing concern about potential health effects to the public from more than 40 yr of nuclear activities. We will provide an overview of the Hanford Environmental Dose Reconstruction Project and its technical approach. The work has required development of new methods and tools for dealing with unique technical and communication challenges. Scientists are using a probabilistic, rather than the more typical deterministic, approach to generate dose distributions rather than single-point estimates. Uncertainties in input parameters are reflected in dose results. Sensitivity analyses are used to optimize project resources and define the project's scope. An independent technical steering panel directs and approves the work in a public forum. Dose estimates are based on review and analysis of historical data related to operations, effluents, and monitoring; determination of important radionuclides; and reconstruction of source terms, environmental conditions that affected transport, concentrations in environmental media, and human elements, such as population distribution, agricultural practices, food consumption patterns, and lifestyles. A companion paper in this volume, The Hanford Environmental Dose Reconstruction Project: Technical Approach, describes the computational framework for the work

  14. Klickitat Cogeneration Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  15. Klickitat Cogeneration Project: Final environmental assessment

    International Nuclear Information System (INIS)

    1994-09-01

    To meet BPA's contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA's proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact)

  16. X-ray CT core imaging of Oman Drilling Project on D/V CHIKYU

    Science.gov (United States)

    Michibayashi, K.; Okazaki, K.; Leong, J. A. M.; Kelemen, P. B.; Johnson, K. T. M.; Greenberger, R. N.; Manning, C. E.; Harris, M.; de Obeso, J. C.; Abe, N.; Hatakeyama, K.; Ildefonse, B.; Takazawa, E.; Teagle, D. A. H.; Coggon, J. A.

    2017-12-01

    We obtained X-ray computed tomography (X-ray CT) images for all cores (GT1A, GT2A, GT3A and BT1A) in Oman Drilling Project Phase 1 (OmanDP cores), since X-ray CT scanning is a routine measurement of the IODP measurement plan onboard Chikyu, which enables the non-destructive observation of the internal structure of core samples. X-ray CT images provide information about chemical compositions and densities of the cores and is useful for assessing sample locations and the quality of the whole-round samples. The X-ray CT scanner (Discovery CT 750HD, GE Medical Systems) on Chikyu scans and reconstructs the image of a 1.4 m section in 10 minutes and produces a series of scan images, each 0.625 mm thick. The X-ray tube (as an X-ray source) and the X-ray detector are installed inside of the gantry at an opposing position to each other. The core sample is scanned in the gantry with the scanning rate of 20 mm/sec. The distribution of attenuation values mapped to an individual slice comprises the raw data that are used for subsequent image processing. Successive two-dimensional (2-D) slices of 512 x 512 pixels yield a representation of attenuation values in three-dimensional (3-D) voxels of 512 x 512 by 1600 in length. Data generated for each core consist of core-axis-normal planes (XY planes) of X-ray attenuation values with dimensions of 512 × 512 pixels in 9 cm × 9 cm cross-section, meaning at the dimensions of a core section, the resolution is 0.176 mm/pixel. X-ray intensity varies as a function of X-ray path length and the linear attenuation coefficient (LAC) of the target material is a function of the chemical composition and density of the target material. The basic measure of attenuation, or radiodensity, is the CT number given in Hounsfield units (HU). CT numbers of air and water are -1000 and 0, respectively. Our preliminary results show that CT numbers of OmanDP cores are well correlated to gamma ray attenuation density (GRA density) as a function of chemical

  17. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Sebastian Puente

    1998-07-25

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics.

  18. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    International Nuclear Information System (INIS)

    Sebastian Puente

    1998-01-01

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics

  19. The ICDP-Hominin Sites and Paleolakes Drilling Project (HSPDP): new data from the Chew Bahir site in Ethiopia

    Science.gov (United States)

    Leng, Melanie; Dean, Jonathan; Asrat, Asfawossen; Cohen, Andrew; Foerster, Verena; Just, Janna; Klasen, Nicole; Lamb, Henry; Schäbitz, Frank; Trauth, Martin; Viehberg, Finn; Wagner, Bernd

    2016-04-01

    There are currently few long, continuous, Pleistocene records from East Africa, meaning it has been difficult to establish the relative influence of low- versus high-latitude forcing on East African climate and climatic conditions at the time of anatomically modern human origin and subsequent dispersal. We have been attempting to address these gaps in our knowledge by analysing lake sediments taken from Chew Bahir, an area of playa mudflats in southern Ethiopia close to the site of the oldest-known anatomically modern human fossils at Omo-Kibish. In March 2014, Chew Bahir was cored to a depth of ~40 metres, and the resulting sediment sequence is estimated to cover the last ~115ka. In December 2014, a nearby site was drilled to a depth of ~280 metres as part of the International Continental scientific Drilling Programme - Hominin Sites and Paleolakes Drilling Project (HSPDP). The oxygen and carbon isotope composition of endogenic calcite and other data from these cores will be presented. The data show some significant changes in water balance variability, the period prior to 70ka appears very unstable with some significant periods of drought and flood. Between 70-20ka the lake was stable and evaporative. The last 20ka years was wetter.

  20. FASSET - An European project for environmental protection

    International Nuclear Information System (INIS)

    Bruchertseifer, F.

    2003-01-01

    The European research project ''FASSET'' (Framework ASSessment of Enviromental ImpacT) will provide a framework of the environmental impact of the effects of ionising radiation and will identify protection aims for the environmental protection. This project represent a collaboration of different organisations from the European community: Sweden, Norway, Finland, Great Britain, Spain, France and Germany. The German participants are the GSF-research centre for environment and health and the German radiation protection office. The project is founded by the 5 th EC research programme. The existing national and international radiation protection regulations are focused to the humans. Other species, like plants and animals, are protected indirectly, if their habitat are close to urban areas or they represent a part of the food chain. The ICRP position ''if the man is protected, nature is protected as well'' is now under reconsideration by a ICRP-Taskgroup. The identification of perilled real reference organism by the FASSET-project is an working tool for the definition of the protection aims. For that purpose the project is divided into three working packages: dosimetry, exposure pathways and effects. Another working package is responsible for the developing of the concept using the results provided by the other working packages. (orig.)

  1. Appreciation of environmental risks analysis methodologies in the offshore well drilling activities; Analise de metodologias na avaliacao de riscos ambientais relacionados as atividades de perfuracao de pocos maritimos

    Energy Technology Data Exchange (ETDEWEB)

    Zampolli, Daniella M. [Universidade Estadual de Campinas (UNICAMP), Campinas, SP (Brazil); Morooka, Celso K. [Universidade Estadual de Campinas (UNICAMP), Campinas, SP (Brazil). Faculdade de Engenharia Mecanica. Dept. de Engenharia de Petroleo

    2004-07-01

    Nowadays, the projects of products and processes are supposed to integrate environmental risks criteria, in addition to their inherent operation impacts. Industrial activities, in general, generate risks to the environment, and, in case of incidents occurrence, many of the possible consequences can be translated into serious impacts. The Risk Analysis is destined to act as a decision tool in the environmental area, and therefore, the use of one of these during the project phase of an enterprise becomes important, aiming the guarantee of the system reliability. The present article has the purpose of analyzing methodologies that are being employed for the environmental risk analysis, as well as usual procedures applied in the oil industry, specially for the offshore wells drilling, evaluating and discussing their peculiarities and possible improvement. It was intended to obtain a general overview of risk analysis methodologies, with the objective of verifying the existence of some characteristics that would positively contribute for the knowledge of the inherent risks in the activities of petroleum installations, where this kind of learning is something extremely technically necessary and legally mandatory. (author)

  2. Environmental Particle Emissions due to Automated Drilling of Polypropylene Composites and Nanocomposites Reinforced with Talc, Montmorillonite and Wollastonite

    Science.gov (United States)

    Starost, K.; Frijns, E.; Laer, J. V.; Faisal, N.; Egizabal, A.; Elizextea, C.; Nelissen, I.; Blazquez, M.; Njuguna, J.

    2017-05-01

    In this study, the effect on nanoparticle emissions due to drilling on Polypropylene (PP) reinforced with 20% talc, 5% montmorillonite (MMT) and 5% Wollastonite (WO) is investigated. The study is the first to explore the nanoparticle release from WO and talc reinforced composites and compares the results to previously researched MMT. With 5% WO, equivalent tensile properties with a 10 % weight reduction were obtained relative to the reference 20% talc sample. The materials were fabricated through injection moulding. The nanorelease studies were undertaken using the controlled drilling methodology for nanoparticle exposure assessment developed within the European Commission funded SIRENA Life 11 ENV/ES/506 project. Measurements were taken using CPC and DMS50 equipment for real-time characterization and measurements. The particle number concentration (of particles <1000nm) and particle size distribution (4.87nm - 562.34nm) of the particles emitted during drilling were evaluated to investigate the effect of the silicate fillers on the particles released. The nano-filled samples exhibited a 33% decrease (MMT sample) or a 30% increase (WO sample) on the average particle number concentration released in comparison to the neat polypropylene sample. The size distribution data displayed a substantial percentage of the particles released from the PP, PP/WO and PP/MMT samples to be between 5-20nm, whereas the PP/talc sample emitted larger particle diameters.

  3. Drilling technology advances on four fronts

    Energy Technology Data Exchange (ETDEWEB)

    Budd, G.

    2002-01-01

    Trends and advances in drilling technology are discussed. Four different major trends have been identified. One of these is proprietary case drilling which is said to allow operators to simultaneously drill, case, and evaluate oil and gas wells. In proprietary case drilling, the well is drilled with standard oil field casing which remains in the hole all the time, eliminating the need for tripping. Drill bits and other downhole tools are lowered via wireline inside the casing and latched to the last joint of casing. Wells are drilled either by rotating the casing or by using a downhole mud motor for steering, using conventional directional tools. This technology was introduced by Tesco and is marketed in 25 countries along with a full range of drilling products and services. Super single rigs are an other trend which, owing to their versatility, combined with relatively small environmental footprint have become the rig of choice in a growing number of drilling programs. Super single rigs use 45-ft. joints of drill pipe, more versatile top drives and they have an automated pipe handling system. Super singles can be used on both vertical and slant wells and offer advantages of lower costs, higher efficiencies and greater drilling depths. Given their low environmental impact hydraulic capability, super singles also find application where zero disturbance rules are in effect, as for example, in some parts of southern Alberta. Directional drilling and MWD are most associated with SAGD projects but they also have been used and made significant difference in other spheres of oil recovery as well. The fact is that about 35 percent of wells drilled today are drilled with some form of directional drilling; this will stimulate the growth of ever more advanced MWD technology. Northern rigs are in a class of their own in that here the emphasis is on keeping the crew warm, as opposed to lots of gadgets. The most immediately-visible heat-conserving modification is the 60-ft wind

  4. Hanford environmental dose reconstruction project - an overview

    International Nuclear Information System (INIS)

    Shipler, D.B.; Napier, B.A.; Farris, W.T.

    1996-01-01

    The Hanford Environmental Dose Reconstruction Project was initiated because of public interest in the historical releases of radioactive materials from the Hanford Site, located in southcentral Washington State. By 1986, over 38,000 pages of environmental monitoring documentation from the early years of Hanford operations had been released. Special committees reviewing the documents recommended initiation of the Hanford Environmental Dose Reconstruction Project, which began in October 1987, and is conducted by Battelle, Pacific Northwest Laboratories. The technical approach taken was to reconstruct releases of radioactive materials based on facility operating information; develop and/or adapt transport, pathway, and dose models and computer codes; reconstruct environmental, meterological, and hydrological monitoring information; reconstruct demographic, agricultural, and lifestyle characteristics; apply statistical methods to all forms of uncertainty in the information, parameters, and models; and perform scientific investigation that were technically defensible. The geographic area for the study includes ∼2 x 10 5 km 2 (75,000 mi 2 ) in eastern Washington, western Idaho, and northeastern Oregon (essentially the Mid-columbia Basin of the Pacific Northwest). Three exposure pathways were considered: the atmosphere, the Columbia River, and ground water

  5. Environmental measurement-while-drilling-gamma ray spectrometer (EMWD-GRS) system technology demonstration plan for use at the Savannah River Site F-Area Retention Basin

    International Nuclear Information System (INIS)

    Williams, C.V.; Lockwood, G.J.; Normann, R.A.; Gruebel, R.D.

    1996-08-01

    The Environmental Measurement-While-Drilling-Gamma Ray Spectrometer (EMWD-GRS) system represents an innovative blend of new and existing technology that provides the capability of producing real-time environmental and drillbit data during drilling operations. This demonstration plan presents information on the EMWD-GRS technology, demonstration design, Cs-137 contamination at the Savannah River Site F-Area Retention Basin, responsibilities of demonstration participants, and the policies and procedures for the demonstration to be conducted at the Savannah River Site F-Area Retention Basin. The EMWD-GRS technology demonstration will consist of continuously monitoring for gamma-radiation contamination while drilling two horizontal boreholes below the backfilled retention basin. These boreholes will pass near previously sampled vertical borehole locations where concentrations of contaminant levels are known. Contaminant levels continuously recorded by the EMWD-GRS system during drilling will be compared to contaminant levels previously determined through quantitative laboratory analysis of soil samples

  6. Environmental measurement-while-drilling-gamma ray spectrometer (EMWD-GRS) system technology demonstration plan for use at the Savannah River Site F-Area Retention Basin

    Energy Technology Data Exchange (ETDEWEB)

    Williams, C.V.; Lockwood, G.J.; Normann, R.A. [Sandia National Labs., Albuquerque, NM (United States); Gruebel, R.D. [Tech Reps, Inc., Albuquerque, NM (United States)

    1996-08-01

    The Environmental Measurement-While-Drilling-Gamma Ray Spectrometer (EMWD-GRS) system represents an innovative blend of new and existing technology that provides the capability of producing real-time environmental and drillbit data during drilling operations. This demonstration plan presents information on the EMWD-GRS technology, demonstration design, Cs-137 contamination at the Savannah River Site F-Area Retention Basin, responsibilities of demonstration participants, and the policies and procedures for the demonstration to be conducted at the Savannah River Site F-Area Retention Basin. The EMWD-GRS technology demonstration will consist of continuously monitoring for gamma-radiation contamination while drilling two horizontal boreholes below the backfilled retention basin. These boreholes will pass near previously sampled vertical borehole locations where concentrations of contaminant levels are known. Contaminant levels continuously recorded by the EMWD-GRS system during drilling will be compared to contaminant levels previously determined through quantitative laboratory analysis of soil samples.

  7. Environmental control of drilling mud discharge through dewatering in cold weather climates

    International Nuclear Information System (INIS)

    Wojtanowicz, A.K.

    1991-01-01

    The paper presents results of an experimental study into the effect of drilling mud temperature upon the dewatering performance. Three temperature ranges were considered: from flowline temperature to room temperature, from room temperature to freezing point, and the freeze (4 degrees F)/thaw (54 degrees F) cycle. The tested drilling fluids included unweighted and weighted fresh water muds and a weighted salt water mud. a sealed laboratory batch reactor was used in the experiments to prevent rapid vaporization of separated water at temperatures above 140 degrees F. Also, ice or ice-salt baths were utilized for deep freezing. The dewaterability (net water removal) was measured with a bench-top plate press under constant expression pressure 30 psi

  8. Environmental control of drilling mud discharge through dewatering in cold weather climates: effect of ambient temperature

    Energy Technology Data Exchange (ETDEWEB)

    Wojtanowicz, A. K. [Louisiana State Univ., Baton Rouge, LA (United States); Ye, Y. [Jianghan Petroleum Institute, Beijing, (China)

    1998-05-01

    Results of an experimental study of the effects of drilling mud temperature upon dewatering performance at various temperatures were presented. Three temperature ranges (from flowline temperature to room temperature, from room temperature to freezing point, and freeze/thaw, i.e. from -20 degrees C to 12 degrees C) were considered. Both unweighted and weighted fresh water muds and weighted salt water mud were tested using a sealed laboratory batch reactor, to prevent rapid vaporization of separated water at temperatures above 60 degrees C. Deep freezing was achieved by using ice or ice-salt baths. Net water removal was measured with a bench-top plate press under constant expression pressure of 270 kPa. Results showed that the freeze/thaw treatment process proved to be very effective, enhancing water removal by 34 to 39 per cent, and reducing waste mud volume by 64 to 72 per cent. No advantage to dewatering hot drilling mud from active systems was observed at temperatures above 21 degrees C. It was suggested that at temperatures under 21 degrees C, the waste drilling mud diverted from an active system should be dewatered when its temperature is still over 40 degrees C. to reduce the amount of chemicals needed for separation enhancement. 14 refs., 4 tabs., 4 figs.

  9. Waste diminution in Construction projects: Environmental Predicaments

    Science.gov (United States)

    Gharehbaghi, Koorosh; Scott-Young, Christina

    2018-03-01

    Waste diminution in construction projects is not only a behavioural issue, but also an energy consumption and reduction concern. With construction waste equating to the significant amount of exhausted energy together with increased pollution, this contributes to a series of environmental predicaments. The overall goal of construction solid Waste Management is to collect, treat and dispose of solid wastes generated by project activities in an environmentally and socially satisfactory manner, using the most economical means available. As cities expand, their construction activities and consumption patterns further drive up the solid waste quantities. Governments are usually authorized to have responsibility for providing solid Waste Management services, and various administrative laws give them exclusive ownership over the waste produced. In addition, construction waste processing can be further controlled and minimized according to specialized authorities such as Environmental Protection Agencies (EPA) and their relevant acts and regulations. Moreover, a Construction Environmental Management Plan (CEMP) can further control the treatment of waste and therefore, reduce the amount produced. Key elements of a CEMP not only include complying with relevant legislation, standards and guidance from the EPA; however, also to ensuring that there are systems in place to resolve any potential problems associated with site activities. Accordingly, as a part of energy consumption and lessening strategies, this paper will discuss various effective waste reduction methods for construction projects. Finally, this paper will also examine tactics to further improve energy efficiency through innovative construction Waste Management strategies (including desirability rating of most favourable options) to promote the lessening of overall CO2production.

  10. Atmosphere Resource Recovery & Environmental Monitoring for Long Duration Exploration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Atmosphere Resource Recovery & Environmental Monitoring (ARREM) for Long Duration Exploration Project project is maturing Atmosphere Revitalization...

  11. Project Deep Drilling KLX02 - Phase 2. Methods, scope of activities and results. Summary report

    International Nuclear Information System (INIS)

    Ekman, L.

    2001-04-01

    Geoscientific investigations performed by SKB, including those at the Aespoe Hard Rock Laboratory, have so far comprised the bedrock horizon down to about 1000 m. The primary purposes with the c. 1700 m deep, φ76 mm, sub vertical core borehole KLX02, drilled during the autumn 1992 at Laxemar, Oskarshamn, was to test core drilling technique at large depths and with a relatively large diameter and to enable geoscientific investigations beyond 1000 m. Drilling of borehole KLX02 was fulfilled very successfully. Results of the drilling commission and the borehole investigations conducted in conjunction with drilling have been reported earlier. The present report provides a summary of the investigations made during a five year period after completion of drilling. Results as well as methods applied are described. A variety of geoscientific investigations to depths exceeding 1600 m were successfully performed. However, the investigations were not entirely problem-free. For example, borehole equipment got stuck in the borehole at several occasions. Special investigations, among them a fracture study, were initiated in order to reveal the mechanisms behind this problem. Different explanations seem possible, e.g. breakouts from the borehole wall, which may be a specific problem related to the stress situation in deep boreholes. The investigation approach for borehole KLX02 followed, in general outline, the SKB model for site investigations, where a number of key issues for site characterization are studied. For each of those, a number of geoscientific parameters are investigated and determined. One important aim is to erect a lithological-structural model of the site, which constitutes the basic requirement for modelling mechanical stability, thermal properties, groundwater flow, groundwater chemistry and transport of solutes. The investigations in borehole KLX02 resulted in a thorough lithological-structural characterization of the rock volume near the borehole. In order to

  12. Project Deep Drilling KLX02 - Phase 2. Methods, scope of activities and results. Summary report

    Energy Technology Data Exchange (ETDEWEB)

    Ekman, L. [GEOSIGMA AB/LE Geokonsult AB, Uppsala (Sweden)

    2001-04-01

    Geoscientific investigations performed by SKB, including those at the Aespoe Hard Rock Laboratory, have so far comprised the bedrock horizon down to about 1000 m. The primary purposes with the c. 1700 m deep, {phi}76 mm, sub vertical core borehole KLX02, drilled during the autumn 1992 at Laxemar, Oskarshamn, was to test core drilling technique at large depths and with a relatively large diameter and to enable geoscientific investigations beyond 1000 m. Drilling of borehole KLX02 was fulfilled very successfully. Results of the drilling commission and the borehole investigations conducted in conjunction with drilling have been reported earlier. The present report provides a summary of the investigations made during a five year period after completion of drilling. Results as well as methods applied are described. A variety of geoscientific investigations to depths exceeding 1600 m were successfully performed. However, the investigations were not entirely problem-free. For example, borehole equipment got stuck in the borehole at several occasions. Special investigations, among them a fracture study, were initiated in order to reveal the mechanisms behind this problem. Different explanations seem possible, e.g. breakouts from the borehole wall, which may be a specific problem related to the stress situation in deep boreholes. The investigation approach for borehole KLX02 followed, in general outline, the SKB model for site investigations, where a number of key issues for site characterization are studied. For each of those, a number of geoscientific parameters are investigated and determined. One important aim is to erect a lithological-structural model of the site, which constitutes the basic requirement for modelling mechanical stability, thermal properties, groundwater flow, groundwater chemistry and transport of solutes. The investigations in borehole KLX02 resulted in a thorough lithological-structural characterization of the rock volume near the borehole. In order

  13. Melancthon Grey Wind Project environmental screening report

    International Nuclear Information System (INIS)

    2005-01-01

    Canadian Hydro has proposed that the Melancthon and Grey Highlands Townships in Dufferin County, Ontario are ideally suited for the installation of a 240 MW wind farm. Assuming a turbine rating of 1.5 MW each, a total of 160 turbines could be installed. The utility has decided to undertake the project in up to 4 phases. This paper focuses on the construction and operation of a 75 MW wind turbine array (50, 1.5 MW turbines) dispersed over an area of about 3,511 hectares in the Melancthon Township. The total expected cost of the first phase is $130 million, with construction scheduled to begin in April 2005 for an in-service date of no later than March 31, 2006 to meet the Wind Power Production Incentive (WPPI) funding requirements. This environmental screening report (ESR) was completed to help Canadian Hydro fulfill regulatory requirements. It presented the project summary, the estimated capacity of the wind farm, and construction schedule. The environmental setting was also presented along with power line routing. This ESR addressed issues that may impact surface and ground water quality, air quality, soil erosion, environmental noise and disposal of waste materials. Issues affecting migratory birds, agricultural resources, community characteristics, construction related traffic, public health, historical resources and viewscapes were also addressed. The general conclusion of the ESR is that the project can be constructed, operated and decommissioned in such a manner as to minimize potentially adverse effects on the environment while enhancing the positive effects both locally and provincially. Migratory bird deaths due to collision with turbines are expected to be negligible and the effects of breeding bird habitat have been minimized through proposed mitigation measures. Environmental noise levels are expected to be within the applicable noise criteria. There will be no negative effect on property values within the viewshed of the turbines. There are many net

  14. The Lake Petén Itzá Scientifi c Drilling Project

    Directory of Open Access Journals (Sweden)

    Daniel Ariztegui

    2006-09-01

    Full Text Available Polar ice cores provide us with high-resolution records of past climate change at high latitudes on both glacial-to-interglacial and millennial timescales. Paleoclimatologists and climate modelers have focused increasingly on the tropics, however, as a potentially important driver of global climate change because of the region’s role in controlling the Earth’s energy budget and in regulating the water vapor content of the atmosphere. Tropical climate change is often expressed most strongly as variations in precipitation, and closed-basin lakes are sensitive recorders of the balance between precipitation and evaporation. Recent advances in fl oating platformsand drilling technology now offer the paleolimnological community the opportunity to obtain long sediment records from lowland tropical lakes, as illustrated by the recent successful drilling of Lakes Bosumtwi and Malawi in Africa (Koeberl et al., 2005; Scholz et al., 2006. Tropical lakes suitable for paleoclimatic research were sought in Central America to complement the African lake drilling. Most lakes in the Neotropics are shallow, however, and these basins fell dry during the Late Glacial period because the climate in the region was more arid than today. The search for an appropriate lake to study succeeded in 1999 when a bathymetric survey of Lake Petén Itzá, northern Guatemala, revealed a maximum depth of 165 m, making itthe deepest lake in the lowlands of Central America (Fig. 1 .Although the lake was greatly reduced in volume during the Late Glacial period, the deep basin remained submerged and thus contains a continuous history of lacustrine sediment deposition. A subsequent seismic survey of Lake Petén Itzá in 2002 showed a thick sediment package overlying basement, with several subbasins containing up to 100 m of sediment (Anselmetti et al., 2006.

  15. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  16. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  17. El'gygytgyn impact crater, Chukotka, Arctic Russia: Impact cratering aspects of the 2009 ICDP drilling project

    Science.gov (United States)

    Koeberl, Christian; Pittarello, Lidia; Reimold, Wolf Uwe; Raschke, Ulli; Brigham-Grette, Julie; Melles, Martin; Minyuk, Pavel; Spray, John

    2013-01-01

    The El'gygytgyn impact structure in Chukutka, Arctic Russia, is the only impact crater currently known on Earth that was formed in mostly acid volcanic rocks (mainly of rhyolitic, with some andesitic and dacitic, compositions). In addition, because of its depth, it has provided an excellent sediment trap that records paleoclimatic information for the 3.6 Myr since its formation. For these two main reasons, because of the importance for impact and paleoclimate research, El'gygytgyn was the subject of an International Continental Scientific Drilling Program (ICDP) drilling project in 2009. During this project, which, due to its logistical and financial challenges, took almost a decade to come to fruition, a total of 642.3 m of drill core was recovered at two sites, from four holes. The obtained material included sedimentary and impactite rocks. In terms of impactites, which were recovered from 316.08 to 517.30 m depth below lake bottom (mblb), three main parts of that core segment were identified: from 316 to 390 mblb polymict lithic impact breccia, mostly suevite, with volcanic and impact melt clasts that locally contain shocked minerals, in a fine-grained clastic matrix; from 385 to 423 mblb, a brecciated sequence of volcanic rocks including both felsic and mafic (basalt) members; and from 423 to 517 mblb, a greenish rhyodacitic ignimbrite (mostly monomict breccia). The uppermost impactite (316–328 mblb) contains lacustrine sediment mixed with impact-affected components. Over the whole length of the impactite core, the abundance of shock features decreases rapidly from the top to the bottom of the studied core section. The distinction between original volcanic melt fragments and those that formed later as the result of the impact event posed major problems in the study of these rocks. The sequence that contains fairly unambiguous evidence of impact melt (which is not very abundant anyway, usually less than a few volume%) is only about 75 m thick. The reason for

  18. Uranium mining environmental restoration project (PRAMU)

    International Nuclear Information System (INIS)

    Asenjo, A.

    2002-01-01

    The National Atomic Energy Commission (CNEA) started its activities 50 years ago and obtained significant results. At the present time, the CNEA is defined as an Institution of research and development in the nuclear field. It is also responsible for the management of radioactive wastes and the dismantling of nuclear and radioactive facilities. Mining and milling activities have been carried out during the past 40 years and at present the CNEA is undertaking the Uranium Mining Environmental Restoration Project (PRAMU). The aim of this project is to restore the environment as much as is possible in all places where uranium mining and milling activities were developed when taking into consideration both economic and technical reality. First, the characteristics of the problems in each site are determined through appropriate studies which identify the existing or potential impacts, the possible pathways of contamination, etc. The sites being studied are: MALARGUE (Mendoza Province), CORDOBA (Cordoba Province), LOS GIGANTES (Cordoba Province), HUEMUL (Mendoza Province), PICHINAN (Chubut Province), TONCO (Salta Province), LA ESTELA (San Luis Province), LOS COLORADOS (La Rioja Province). PRAMU seeks to improve the current conditions of the tailings deposits and mines and to ensure the long term protection of people and the environment. The CNEA is required to comply with all legislation that is in force and is under the control of various national, provincial and local State institutions. The main objectives of the project for the various sites are: (a) Malargue site: to implement the actions necessary for environmental restoration and management of the tailings derived from the uranium ores processed in the industrial plant; (b) Cordoba and Los Gigantes sites: to design, engineer and execute the activities required for closure of the sites; (c) Other sites (Huemul, Pichinan, Tonco, La Estela, Los Colorados): to develop an environmental evaluation and, on the basis of

  19. Bear Creek Project. Draft environmental statement

    International Nuclear Information System (INIS)

    1977-01-01

    The Bear Creek Project consists of mining and milling operations involving uranium ore deposits located in Converse County, Wyoming. Mining of uranium from six known ore bodies will take place over ten years; a 1000 tons ore/day will be constructed and operated as long as ore is available. The tailings will be stored onsite in an impoundment. The project would convert 2700 acres from grazing use to mining/milling activities for about ten years. Mining would disturb a total of 1600 acres but, because of reclamation, the max acreage disturbed at any one time would be about 1000 acres, the average being about 650 acres. Dose rates were computed for an individual in a ranch house at the nearest ranch. Conditions for the protection of the environment are proposed. Possible environmental impacts evaluated cover air, land, water, soil, vegetation, wildlife, and community. A benefit-cost analysis is made

  20. Bear Creek Project. Final environmental statement

    International Nuclear Information System (INIS)

    1977-06-01

    The Bear Creek Project consists of certain mining and milling operations involving uranium ore deposits located in Converse County, Wyoming. Mining of uranium from nine known ore bodies will take place over a period of ten years (estimated); a mill with a nominal capacity of 1000 tons per day of ore will be constructed and operated as long as ore is available. The waste material (tailings) from the mill, also produced at a rate of about 1000 tons per day, will be stored onsite in an impoundment. Environmental impacts and adverse effects are summarized

  1. S-Wave Velocity Structure of the Taiwan Chelungpu Fault Drilling Project (TCDP) Site Using Microtremor Array Measurements

    Science.gov (United States)

    Wu, Cheng-Feng; Huang, Huey-Chu

    2015-10-01

    The Taiwan Chelungpu Fault Drilling Project (TCDP) drilled a 2-km-deep hole 2.4 km east of the surface rupture of the 1999 Chi-Chi earthquake ( M w 7.6), near the town of Dakeng. Geophysical well logs at the TCDP site were run over depths ranging from 500 to 1,900 m to obtain the physical properties of the fault zones and adjacent damage zones. These data provide good reference material for examining the validity of velocity structures using microtremor array measurement; therefore, we conduct array measurements for a total of four arrays at two sites near the TCDP drilling sites. The phase velocities at frequencies of 0.2-5 Hz are calculated using the frequency-wavenumber ( f- k) spectrum method. Then the S-wave velocity structures are estimated by employing surface wave inversion techniques. The S-wave velocity from the differential inversion technique gradually increases from 1.52 to 2.22 km/s at depths between 585 and 1,710 m. This result is similar to those from the velocity logs, which range from 1.4 km/s at a depth of 597 m to 2.98 km/s at a depth of 1,705 m. The stochastic inversion results are similar to those from the seismic reflection methods and the lithostratigraphy of TCDP-A borehole, comparatively. These results show that microtremor array measurement provides a good tool for estimating deep S-wave velocity structure.

  2. Synchronizing early Eocene deep-sea and continental records - cyclostratigraphic age models for the Bighorn Basin Coring Project drill cores

    Science.gov (United States)

    Westerhold, Thomas; Röhl, Ursula; Wilkens, Roy H.; Gingerich, Philip D.; Clyde, William C.; Wing, Scott L.; Bowen, Gabriel J.; Kraus, Mary J.

    2018-03-01

    A consistent chronostratigraphic framework is required to understand the effect of major paleoclimate perturbations on both marine and terrestrial ecosystems. Transient global warming events in the early Eocene, at 56-54 Ma, show the impact of large-scale carbon input into the ocean-atmosphere system. Here we provide the first timescale synchronization of continental and marine deposits spanning the Paleocene-Eocene Thermal Maximum (PETM) and the interval just prior to the Eocene Thermal Maximum 2 (ETM-2). Cyclic variations in geochemical data come from continental drill cores of the Bighorn Basin Coring Project (BBCP, Wyoming, USA) and from marine deep-sea drilling deposits retrieved by the Ocean Drilling Program (ODP). Both are dominated by eccentricity-modulated precession cycles used to construct a common cyclostratigraphic framework. Integration of age models results in a revised astrochronology for the PETM in deep-sea records that is now generally consistent with independent 3He age models. The duration of the PETM is estimated at ˜ 200 kyr for the carbon isotope excursion and ˜ 120 kyr for the associated pelagic clay layer. A common terrestrial and marine age model shows a concurrent major change in marine and terrestrial biota ˜ 200 kyr before ETM-2. In the Bighorn Basin, the change is referred to as Biohorizon B and represents a period of significant mammalian turnover and immigration, separating the upper Haplomylus-Ectocion Range Zone from the Bunophorus Interval Zone and approximating the Wa-4-Wa-5 land mammal zone boundary. In sediments from ODP Site 1262 (Walvis Ridge), major changes in the biota at this time are documented by the radiation of a second generation of apical spine-bearing sphenolith species (e.g., S. radians and S. editus), the emergence of T. orthostylus, and the marked decline of D. multiradiatus.

  3. Integration and evaluation of a position sensor with continuous read-out for use with the Environmental Measurement-While-Drilling Gamma Ray Spectrometer system

    International Nuclear Information System (INIS)

    Normann, R.A.; Lockwood, G.J.; Williams, C.V.; Selph, M.M.

    1998-02-01

    The Environmental Measurement-While-Drilling-Gamma Ray Spectrometer (EMWD-GRS) system represents an innovative blend of new and existing technology that provides real-time environmental and drill bit data during drilling operations. The EMWD-GRS technology was demonstrated at Savannah River Site (SRS) F-Area Retention Basin. The EMWD-GRS technology demonstration consisted of continuously monitoring for gamma-radiation-producing contamination while drilling two horizontal boreholes below the backfilled waste retention basin. These boreholes passed near previously sampled locations where concentrations of contaminant levels of cesium had been measured. Contaminant levels continuously recorded by the EMWD-GRS system during drilling were compared to contaminant levels previously determined through quantitative laboratory analysis of soil samples. The results show general agreement between the soil sampling and EMWD-GRS techniques for Cs-137. The EMWD-GRS system has been improved by the integration of an orientation sensor package for position sensing (PS) (EMWD-GRS/PS). This added feature gives the capability of calculating position, which is tied directly to EMWD-GRS sensor data obtained while drilling. The EMWD-GRS/PS system is described and the results of the field tests are presented

  4. Environmental corrections of a dual-induction logging while drilling tool in vertical wells

    Science.gov (United States)

    Kang, Zhengming; Ke, Shizhen; Jiang, Ming; Yin, Chengfang; Li, Anzong; Li, Junjian

    2018-04-01

    With the development of Logging While Drilling (LWD) technology, dual-induction LWD logging is not only widely applied in deviated wells and horizontal wells, but it is used commonly in vertical wells. Accordingly, it is necessary to simulate the response of LWD tools in vertical wells for logging interpretation. In this paper, the investigation characteristics, the effects of the tool structure, skin effect and drilling environment of a dual-induction LWD tool are simulated by the three-dimensional (3D) finite element method (FEM). In order to closely simulate the actual situation, real structure of the tool is taking into account. The results demonstrate that the influence of the background value of the tool structure can be eliminated. The values of deducting the background of a tool structure and analytical solution have a quantitative agreement in homogeneous formations. The effect of measurement frequency could be effectively eliminated by chart of skin effect correction. In addition, the measurement environment, borehole size, mud resistivity, shoulder bed, layer thickness and invasion, have an effect on the true resistivity. To eliminate these effects, borehole correction charts, shoulder bed correction charts and tornado charts are computed based on real tool structure. Based on correction charts, well logging data can be corrected automatically by a suitable interpolation method, which is convenient and fast. Verified with actual logging data in vertical wells, this method could obtain the true resistivity of formation.

  5. Final rapid reactivation project environmental assessment

    International Nuclear Information System (INIS)

    1999-01-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA

  6. Environmental impacts associated with Project Rio Blanco

    International Nuclear Information System (INIS)

    Alldredge, A.W.; Whicker, F.W.; Hanson, W.C.

    Project Rio Blanco, an experiment involving deep underground detonation of three 30-kton nuclear explosives designed to stimulate natural gas flow in geologic formations of low permeability, was conducted in western Colorado on 17 May 1973. Environmental impacts associated with this experiment were divided into three categories: radiation, ground motion, and conventional physical activities. Radiation and ground motion are unique to this type experiment while conventional activities would be associated with any type of resource development. The objective of observations made at Rio Blanco was to qualitatively and, where possible, quantitatively ascertain environmental impacts associated with the project. Observations indicated that ground motion and conventional activities appeared to cause the greatest impacts. Ground motion impacts were most severe within 2.4 km of the emplacement well (EW) and were predominantly associated with steep ravine and stream banks and rocky cliffs. Following the detonation, flow and turbidity had increased in a small stream adjacent to the EW. Animals receiving deleterious impacts were those associated with stream banks, cliffs and burrows. No mortality or injury was observed in any large animals. (U.S.)

  7. Linking downhole logging data and clay mineralogy analysis in the ICDP Lake Junín drilling Project, Peru

    Science.gov (United States)

    Pierdominici, S.; Schleicher, A.; Kueck, J.; Rodbell, D. T.; Abbott, M. B.

    2017-12-01

    The lake Junin drilling project, co-funded by the International Continental Drilling Program (ICDP), is located at 4000 m a.s.l. in the tropical Andes of Peru. Several boreholes were drilled with the goal to obtain both high-resolution paleoclimate records from lacustrine sediments and to reconstruct the history of the continental records covering the glacial-interglacial cycles. Lake Junín is characterized by a thick package of lacustrine sediments (> 125 m) deposited at a high rate (0.2 to 1.0 mm yr-1), and it is one of the few lakes in the tropical Andes that is hundreds of thousands of years old with a continuous sedimentation rate preserving a very long and continuous record of past ice age cycles. The boreholes reached a maximum depth of 110.08 m and continuous coring was performed at three sites with 11 boreholes. Additionally, an extensive geophysical downhole logging campaign was performed on five boreholes (1A, 1C, 1D, 2A and 3B) by the Operational Support Group of ICDP. Downhole logging measurements comprise total and spectrum gamma ray, magnetic susceptibility, borehole geometry, temperature, and sonic p-wave velocity. In order to fit the downhole logging depths to the composite profile depths, each borehole was depth-matched with the core data. Interpreting the downhole logging data permits to establish a complete lithological log, to characterize the in-situ physical properties of drilled lacustrine sediments, to determine sedimentary structures and to obtain evidences about palaeoclimatic conditions during up to 200 ka. Th and K values are used as a proxy for a first estimate and characterization of clay content in the sediments, which are present as montmorillonite, smectite, illite, and kaolinite in different amounts. Linking the clay minerals that occur in the core material with the downhole logging data allows assessing the geological history of the lake and the relationship to climate change processes. Additional laboratory analysis will be

  8. Popular epidemiology and "fracking": citizens' concerns regarding the economic, environmental, health and social impacts of unconventional natural gas drilling operations.

    Science.gov (United States)

    Powers, Martha; Saberi, Poune; Pepino, Richard; Strupp, Emily; Bugos, Eva; Cannuscio, Carolyn C

    2015-06-01

    Pennsylvania sits atop the Marcellus Shale, a reservoir of natural gas that was untapped until the 2004 introduction of unconventional natural gas drilling operations (UNGDO) in the state. Colloquially known as fracking, UNGDO is a controversial process that employs large volumes of water to fracture the shale and capture gas; it has become a multi-billion dollar industry in Pennsylvania. We analyzed letters to the editor of the most widely circulated local newspaper in the most heavily drilled county in Pennsylvania (Bradford County) in order to characterize residents' concerns and their involvement in popular epidemiology--the process by which citizens investigate risks associated with a perceived environmental threat. We reviewed 215 letters to the editor that referenced natural gas operations and were published by The Daily Review between January 1, 2008 and June 8, 2013. We used NVivo 10 to code and analyze letters and identify major themes. Nvivo is qualitative data analysis software (http://www.qsrinternational.com/products_nvivo.aspx) that allows researchers to code and analyze "unstructured" data, including text files of any type (e.g., interview transcripts, news articles, letters, archival materials) as well as photographs and videos. Nvivo can be used to classify, sort, query, comment on, and share data across a research group. Letters demonstrated citizen engagement in beginning and intermediate stages of lay epidemiology, as well as discord and stress regarding four main issues: socio-economic impacts, perceived threats to water, population growth and implications, and changes to the rural landscape. Residents called for stronger scientific evidence and a balance of economic development and health and environmental protections. Citizens' distress regarding UNGDO appeared to be exacerbated by a dearth of information to guide economic growth and health, environmental, and social concerns. This analysis proposes locally informed questions to guide future

  9. Griffith energy project draft environmental impact statement

    International Nuclear Information System (INIS)

    1998-10-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. The existing environmental resource conditions in the Project area and the potential impacts on the resources by the proposed action and alternatives are described. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management

  10. Environmental conditions and vegetation recovery at abandoned drilling mud sumps in the Mackenzie Delta region, Northwest Territories, Canada

    Energy Technology Data Exchange (ETDEWEB)

    Johnstone, J.F. [Saskatchewan Univ., Regina, SK (Canada). Dept. of Biology

    2008-06-15

    Decadal scale impacts of exploratory oil and gas drilling activities on native plant communities in the lower Arctic tundra were investigated. The study used historical data from oil and gas exploration activities in the Mackenzie River Delta to assess changes in vegetation composition and environmental gradients at 7 drilling mud sumps located in the Kendall Island Bird Sanctuary. Over a period of 3 decades, the sumps had developed vegetation coverage equivalent in mass to vegetation in undisturbed areas. However, bare soil was observed at ponded sites where salt crusts had formed. The vegetation was composed of forbs, grasses, and tall shrubs that were distinct from surrounding low shrub communities. The area of vegetation around the sump was larger in upland and saline environments. Water around the sumps was associated with thaw subsidence that occurred after construction activities. Changes in drainage, surface salt concentrations, and active-layer depths were seen as the most significant factors in the resulting plant communities. 31 refs., 4 tabs., 7 figs.

  11. Evaluation of an air drilling cuttings containment system

    Energy Technology Data Exchange (ETDEWEB)

    Westmoreland, J.

    1994-04-01

    Drilling at hazardous waste sites for environmental remediation or monitoring requires containment of all drilling fluids and cuttings to protect personnel and the environment. At many sites, air drilling techniques have advantages over other drilling methods, requiring effective filtering and containment of the return air/cuttings stream. A study of. current containment methods indicated improvements could be made in the filtering of radionuclides and volatile organic compounds, and in equipment like alarms, instrumentation or pressure safety features. Sandia National Laboratories, Dept. 61 11 Environmental Drilling Projects Group, initiated this work to address these concerns. A look at the industry showed that asbestos abatement equipment could be adapted for containment and filtration of air drilling returns. An industry manufacturer was selected to build a prototype machine. The machine was leased and put through a six-month testing and evaluation period at Sandia National Laboratories. Various materials were vacuumed and filtered with the machine during this time. In addition, it was used in an actual air drive drilling operation. Results of these tests indicate that the vacuum/filter unit will meet or exceed our drilling requirements. This vacuum/filter unit could be employed at a hazardous waste site or any site where drilling operations require cuttings and air containment.

  12. Bangladesh Agro-Climatic Environmental Monitoring Project

    Science.gov (United States)

    Vermillion, C.; Maurer, H.; Williams, M.; Kamowski, J.; Moore, T.; Maksimovich, W.; Obler, H.; Gilbert, E.

    1988-01-01

    The Agro-Climatic Environmental Monitoring Project (ACEMP) is based on a Participating Agency Service Agreement (PASA) between the Agency for International Development (AID) and the National Oceanic and Atmospheric Administration (NOAA). In FY80, the Asia Bureau and Office of Federal Disaster Assistance (OFDA), worked closely to develop a funding mechanism which would meet Bangladesh's needs both for flood and cyclone warning capability and for application of remote sensing data to development problems. In FY90, OFDA provided for a High Resolution Picture Transmission (HRPT) receiving capability to improve their forecasting accuracy for cyclones, flooding and storm surges. That equipment is primarily intended as a disaster prediction and preparedness measure. The ACEM Project was designed to focus on the development applications of remote sensing technology. Through this Project, AID provided to the Bangladesh Government (BDG) the equipment, technical assistance, and training necessary to collect and employ remote sensing data made available by satellites as well as hydrological data obtained from data collection platforms placed in major rivers. The data collected will enable the BDG to improve the management of its natural resources.

  13. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    Science.gov (United States)

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  14. Sedimentological, mineralogical, and geochemical results from surface sediments and the sediment record from Site 2 of the ICDP drilling project at Lake Towuti, Indonesia

    Science.gov (United States)

    Hasberg, A. K.; Melles, M.; Wennrich, V.; Vogel, H.; Just, J.; Russell, J. M.; Bijaksana, S.; Morlock, M.; Opitz, S.

    2017-12-01

    More than 1000 m of sediment core were recovered in spring 2015 from three different drill sites in tropical Lake Towuti (2.5°S, 121°E), Indonesia, during the Towuti Drilling Project (TDP) of the International Continental Scientific Drilling Program (ICDP). Furthermore, a set of 84 lake surface sediment samples, distributed over the entire lake, was collected in order to better understand modern sedimentary processes. The surface samples were investigated for physical, chemical, mineralogical, and biological properties at the University of Cologne (UoC), Germany. On the sediment cores macro- and microscopical lithological descriptions, line-scan imaging, logging of physical properties (MSCL), and subsampling was conducted at the National Lacustrine Core Facility of the University of Minnesota, USA, in November 2015 and January 2016. Afterwards, the archive core halves and 672 subsamples of TDP Site 2 were shipped to the UoC for X-Ray Fluorescence (XRF) scanning and sedimentological, geochemical, and mineralogical analyses, respectively, supplemented by visible to near-infrared spectroscopy (VNIR) at Brown University, USA. The data from the surface samples evidence that allochthonous sedimentation in Lake Towuti today is dominated by fluvial supply from five distinguishable source areas: (i) the Mahalona River to the north, which drains lakes Mahalona and Matano, (ii) inlets around the village of Timampu to the northwest, (iii) the Loeha River to the east, (iv) the Lengke River to the south, and (v) the Lemo-Lemo River to the northeast of Lake Towuti. Of these, source areas (ii) and (iii) as well as (iv) and (v) have similar geochemical compositions, respectively. In addition, the lake sedimentation is significantly influenced by gravitational sediment supply from steep slopes as well as lake-internal gravitational and density-driven processes. The uppermost 41 m of sediment core 2A consist of pelagic sediments (totaling 11 m) and event layers from mass movement

  15. Casing drilling

    Energy Technology Data Exchange (ETDEWEB)

    Heenan, D. [Tesco Corp., Calgary, AB (Canada)

    2003-07-01

    This paper reviewed the experience that Tesco has gained by drilling several wells using only casings as the drill stem. Tesco has manufactured a mobile and compact hydraulic drilling rig called the Casing Drilling {sup TM} system. The system could be very effective and efficient for exploration and development of coalbed methane (CBM) reserves which typically require extensive coring. Continuous coring while drilling ahead, along wire line retrieval, can offer time savings and quick core recovery of large diameter core which is typically required for exploration core desorption tests. The proposed system may also have the potential to core or drill typically tight gas sands or underbalanced wells with air or foam. This would reduce drilling fluid damage while simultaneously finding gas. Compared to conventional drill pipes, Casing Drilling {sup TM} could also be effective with water production from shallow sands because of the smaller annual clearance which requires less air volumes to lift any produced water. 9 figs.

  16. Environmentally Preferable Coatings for Structural Steel Project

    Science.gov (United States)

    Lewis, Pattie L. (Editor)

    2014-01-01

    The Ground Systems Development and Operations (GSDO) Program at NASA John F. Kennedy Space Center (KSC) has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described a the "launch support and infrastructure modernization program" in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of the GSDO Program, the objective of this project is to determine the feasibility of environmentally friendly corrosion resistant coatings for launch facilities and ground support equipment. The focus of the project is corrosion resistance and survivability with the goal to reduce the amount of maintenance required to preserve the performance of launch facilities while reducing mission risk. Number of facilities/structures with metallic structural and non-structural components in a highly corrosive environment. Metals require periodic maintenance activity to guard against the insidious effects of corrosion and thus ensure that structures meet or exceed design or performance life. The standard practice for protecting metallic substrates in atmospheric environments is the application of corrosion protective coating system.

  17. Results of the marine biota monitoring during drilling activity on Campos Basin, Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Petta, Claudia Brigagao de; Bastos, Fabio; Danielski, Monica; Ferreira, Mariana; Gama, Mariana; Coelho, Ana Paula Athanazio; Maia, Decio [Aecom do Brasil Ltda, Rio de Janeiro, RJ (Brazil)

    2012-07-01

    The Environmental Monitoring Project (PMA) aims to report environmental changes arising from drilling activity, in relation to the marine fauna. This project can also help in the monitoring of accidental spills. Since the professionals spend six hours of the day monitoring the ocean around the rigs, they can locate and identify oil stains, notify the responsible onboard, and also help in the monitoring of the oil stain. Such Project has been developed onboard a drilling unit working in Campos Basin. The results presented here were collected during the drilling activity in Bijupira and Salema fields, by Shell Brasil Petroleo Ltda, from July 13th to October 8th, 2011.

  18. Rangitoto Volcano Drilling Project: Life of a Small 'Monogenetic' Basaltic Shield in the Auckland Volcanic Field

    Science.gov (United States)

    Shane, P. A. R.; Linnell, T.; Lindsay, J. M.; Smith, I. E.; Augustinus, P. M.; Cronin, S. J.

    2014-12-01

    Rangitoto is a small basaltic shield volcano representing the most recent and most voluminous episode of volcanism in the Auckland Volcanic Field, New Zealand. Auckland City is built on the field, and hence, Rangitoto's importance in hazard-risk modelling. The symmetrical edifice, ~6 km wide and 260 m high, has volume of 1.78 km3. It comprises summit scoria cones and a lava field. However, the lack of deep erosion dissection has prevented the development of an eruptive stratigraphy. Previous studies suggested construction in a relatively short interval at 550-500 yrs BP. However, microscopic tephra have been interpreted as evidence of intermittent activity from 1498 +/- 140 to 504 +/- 6 yrs BP, a longevity of 1000 years. A 150-m-deep hole was drilled through the edifice in February 2014 to obtain a continuous core record. The result is an unparalleled stratigraphy of the evolution of a small shield volcano. The upper 128 m of core comprises at least 27 lava flows with thicknesses in the range 0.3-15 m, representing the main shield-building phase. Underlying marine sediments are interbedded with 8 m of pyroclastic lapilli, and a thin lava flow, representing the explosive phreatomagmatic birth of the volcano. Preliminary geochemical analyses reveal suite of relatively uniform transitional basalts (MgO = 8.1 to 9.7 wt %). However, 4 compositional groups are distinguished that were erupted in sequential order. High-MgO magmas were erupted first, followed by a two more heterogeneous groups displaying differentiation trends with time. Finally, distinct low-MgO basalts were erupted. Each magma type appears to represent a new magma batch. The core places the magma types in a time series, which can be correlated to the surface lava field. Hence, allowing a geometrical reconstruction of the shield growth. Additional petrologic investigations are providing insight to magmatic ascent processes, while radiocarbon and paleomagnetic secular variation studies will reveal the

  19. Listvenite formation from peridotite: Insights from Oman Drilling Project hole BT1B and preliminary reaction path model approach.

    Science.gov (United States)

    de Obeso, J. C.; Kelemen, P. B.; Manning, C. E.; Michibayashi, K.; Harris, M.

    2017-12-01

    Oman Drilling Project hole BT1B drilled 300 meters through the basal thrust of the Samail ophiolite. The first 200 meters of this hole are dominated by listvenites (completely carbonated peridotites) and serpentinites. Below 200 meters the hole is mainly composed of metasediments and metavolcanics. This core provides a unique record of interaction between (a) mantle peridotite in the leading edge of the mantle wedge and (b) hydrous, CO2 rich fluids derived from subducting lithologies similar to those in the metamorphic sole. We used EQ3/6 to simulate a reaction path in which hydrous fluid in equilibrium with qtz + calcite + feldspar + chlorite or smectite reacts with initially fresh peridotite at 100°C (the estimated temperature of alteration, Falk & Kelemen GCA 2015) and 5 kb. Water was first equilibrated with minerals observed during core description in the metamorphic sole at 100°C and 5kb. This fluid is then reacted with olivine enstatite and diopside (Mg#90) approximating the average composition of residual mantle peridotite (harzburgite) in Oman. Secondary minerals resulting from complete reaction are then reacted again with the initial fluid in an iterative process, up to water/rock > 1000. Water/rock close to 1 results in complete serpentinization of the peridotite, with chrysotile, brucite and magnetite as the only minerals. Water/rock >10 produces carbonates, chlorite and talc. Further increasing water/rock to > 100 produces assemblages dominated by carbonates and quartz with minor muscovite, similar to listvenites of hole BT1B that contain qtz + carbonates + Fe-oxyhydroxides + relict spinel ± chromian muscovite and fuchsite. The results of this preliminary model are consistent with the complex veining history of core from BT1B, with carbonate/iron oxide veins in both listvenites and serpentinites interpreted to be the earliest record of peridotite carbonation after initial serpentinization.

  20. Drilling unit

    Energy Technology Data Exchange (ETDEWEB)

    Umanchik, N P; Demin, A V; Khrustalev, N N; Linnik, G N; Lovchev, S V; Rozin, M M; Sidorov, R V; Sokolov, S I; Tsaregradskiy, Yu P

    1981-01-01

    A drilling unit is proposed which includes a hydraulic lifter, hydraulic multiple-cylinder pump with valve distribution and sectional drilling pump with separators of the working and flushing fluid. In order to reduce metal consumption and the overall dimensions of the drilling unit, the working cavity of each cylinder of the hydraulic multiple-cylinder pump is equipped with suction and injection valves and is hydraulically connected to the working cavity by one of the sections of the drilling pump.

  1. First evaluation of foraminiferal metabarcoding for monitoring environmental impact from an offshore oil drilling site

    KAUST Repository

    Laroche, Olivier

    2016-08-29

    At present, environmental impacts from offshore oil and gas activities are partly determined by measuring changes in macrofauna diversity. Morphological identification of macrofauna is time-consuming, expensive and dependent on taxonomic expertise. In this study, we evaluated the applicability of using foraminiferal-specific metabarcoding for routine monitoring. Sediment samples were collected along distance gradients from two oil platforms off Taranaki (New Zealand) and their physicochemical properties, foraminiferal environmental DNA/RNA, and macrofaunal composition analyzed. Macrofaunal and foraminiferal assemblages showed similar shifts along impact gradients, but responded differently to environmental perturbations. Macrofauna were affected by hypoxia, whereas sediment grain size appeared to drive shifts in foraminifera. We identified eight foraminiferal molecular operational taxonomic units that have potential to be used as bioindicator taxa. Our results show that metabarcoding represents an effective tool for assessing foraminiferal communities near offshore oil and gas platforms, and that it can be used to complement current monitoring techniques. (C) 2016 Elsevier Ltd. All rights reserved.

  2. First evaluation of foraminiferal metabarcoding for monitoring environmental impact from an offshore oil drilling site

    KAUST Repository

    Laroche, Olivier; Wood, Susanna A.; Tremblay, Louis A.; Ellis, Joanne; Lejzerowicz, Franck; Pawlowski, Jan; Lear, Gavin; Atalah, Javier; Pochon, Xavier

    2016-01-01

    At present, environmental impacts from offshore oil and gas activities are partly determined by measuring changes in macrofauna diversity. Morphological identification of macrofauna is time-consuming, expensive and dependent on taxonomic expertise. In this study, we evaluated the applicability of using foraminiferal-specific metabarcoding for routine monitoring. Sediment samples were collected along distance gradients from two oil platforms off Taranaki (New Zealand) and their physicochemical properties, foraminiferal environmental DNA/RNA, and macrofaunal composition analyzed. Macrofaunal and foraminiferal assemblages showed similar shifts along impact gradients, but responded differently to environmental perturbations. Macrofauna were affected by hypoxia, whereas sediment grain size appeared to drive shifts in foraminifera. We identified eight foraminiferal molecular operational taxonomic units that have potential to be used as bioindicator taxa. Our results show that metabarcoding represents an effective tool for assessing foraminiferal communities near offshore oil and gas platforms, and that it can be used to complement current monitoring techniques. (C) 2016 Elsevier Ltd. All rights reserved.

  3. Hanford Environmental Dose Reconstruction Project monthly report, August 1992

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography; food consumption; and agriculture; and environmental pathway and dose estimates

  4. Drilling contract issues

    International Nuclear Information System (INIS)

    Davison, G.B.; Worden, D.R.; Borbridge, G.K.D.

    1997-01-01

    Some selected issues which are facing both operators and contractors in drilling for oil and gas, such as the allocation of risk by contract and by statute and the implementation of new technologies, were discussed. There are three varieties of written drilling contracts used in Canada: (1) day work and meterage contracts, (2) master drilling agreements, and (3) contracts that are used in construction projects that do not specifically relate to drilling. Issues relevant to the contractual allocation of risk, to implementing new drilling technologies, to reconciling contract and statute liability, and the formation of strategic alliances for mutual benefit, and the factors contributing to the success of such alliances were explored. 12 refs

  5. Integration and Evaluation of a Position Sensor with Continuous Read-Out for use with the Environmental Measurement-While-Drilling Gamma Ray Spectrometer System

    International Nuclear Information System (INIS)

    Lockwood, G.J.; Normann, R.A.; Selph, M.M.; Williams, C.V.

    1999-01-01

    The Environmental Measurement-While-Drilling-Gamma Ray Spectrometer (EMWD-GRS) system represents an innovative blend of new and existing technology that provides real-time environmental and drill bit data during drilling operations. The EMWD-GRS technology was demonstrated at Savannah River Site (SRS) F-Area Retention Basin. The EMWD-GRS technology demonstration consisted of continuously monitoring for gamma-radiation-producing contamination while drilling two horizontal boreholes below the backfilled waste retention basin. These boreholes passed near previously sampled locations where concentrations of contaminant levels of cesium had been measured. Contaminant levels continuously recorded by the EMWD-GRS system during drilling were compared to contaminant levels previously determined through quantitative laboratory analysis of soil samples. The demonstration of the EMWD-GRS was a complete success. The results show general agreement between the soil sampling and EMWD-GRS techniques for CS-137. It was recognized that the EMWD-GRS tool would better satisfy our customers' needs if the instrument location could be continuously monitored. During the demonstration at SRS, an electromagnetic beacon with a walkover monitor (Subsitereg s ign) was used to measure bit location at depth. To use a beacon locator drilling must be stopped, thus it is normally only used when a new section of pipe was added. The location of contamination could only be estimated based on the position of the EMED-GRS package and the distance between locator beacon readings. A continuous location system that would allow us to know the location of each spectrum as it is obtained is needed

  6. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  7. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    International Nuclear Information System (INIS)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  8. Environmental management audit, Uranium Mill Tailings Remedial Action Project (UMTRA)

    International Nuclear Information System (INIS)

    1993-01-01

    The Office of Environment, Safety and Health (EH) has established, as part of the internal oversight responsibilities within Department of Energy (DOE), a program within the Office of Environmental Audit (EH-24), to conduct environmental audits at DOE's operating facilities. This document contains the results of the Environmental Management Audit of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This Environmental Management Audit was conducted by the DOE's Office of Environmental Audit from October 26 through November 6, 1992. The audit's objective is to advise the Secretary as to the adequacy of UMTRA's environmental programs, and management organization in ensuring environmental protection and compliance with Federal, state, and DOE environmental requirements. This Environmental Management Audit's scope was comprehensive and covered all areas of environmental management with the exception of environmental programs pertaining to the implementation of the requirements of the National Environmental Policy Act (NEPA), which is the responsibility of the DOE Headquarters Office of NEPA Oversight

  9. The Italian drilling project of the Mont Blanc road tunnel in the late fifties: an example of no geological care and lack of ethics in carrying out a big work.

    Science.gov (United States)

    Gosso, Guido; Croce, Giuseppe; Matteucci, Ruggero; Peppoloni, Silvia; Piacente, Sandra; Wasowski, Janusz

    2013-04-01

    In the first decade after the Second World War Italy was rushing to recover a positive role among European countries; basic needs as road communications with European neighbours became main priorities. The necessity of a rapid connection with South-eastern France, a subject already debated between the two nations over more than 50 years, appeared then on first line; the two countries convened on a joint investment for the construction of a tunnel across the international border of Mont Blanc, along the shortest track between Courmayeur and Chamonix. The political agreements were in favour of the quickest start of the drilling operations and such obligation imposed on the Italian side an impoverishment of the project content, specially concerning geological issues. No surveys were performed on fracture systems, cataclastic zones and faults, on the few rock ridges standing above the tunnel line and outcropping through thick talus cones, moraines, ice tongues and their related ice plateaus. Metasediments, migmatites and poorly foliated granites were to be drilled. Three Italian academics were allowed by the drilling company to track the working progress and collect rocks for comparison with other Alpine types; they mapped the lithology and the fault zonesall along the freshly excavated tunnel; the results of such survey appeared after the end of works. Geologists from Florence University published the surface granite faulting pattern 20 years after the road tunnel became operative. Such geological cares could have located the risky zones in time for the tunnel project, mitigating the catastrophic effects of sudden drainage of subglacial water from the Vallée Blanche ice plateau (Ghiacciaio del Gigante) at progression 3800m, that caused dramatic accidents and affected negatively the economy of the drilling. Also the wallrock temperature drops, measured during the drill, should have warned the company management on the location of dangerous fracture zones. Anxiety of

  10. The strontium isotopic composition of interstitial waters from sites 245 and 336 of the deep sea drilling project

    International Nuclear Information System (INIS)

    Hawkesworth, C.J.; Elderfield, H.

    1978-01-01

    Measurements of 87 Sr/ 86 Sr ratios of interstitial waters from leg 25, site 245 and leg 38, site 336 of the Deep Sea Drilling Project show that the enrichment of Sr 2+ with depth is caused both by the alteration of volcanic material and by the introduction of strontium derived from calcium carbonate. 87 Sr/ 86 Sr ratios range from 0.70913 to 0.70794 at site 245 and from 0.70916 to 0.70694 at site 336. The low ratios compared with contemporaneous seawater reflect the release of Sr from a volcanic source having, according to material-balance calculations, a 87 Se/ 86 Sr ratio of about 0.7034 at site 336. At this site the source appears to be volcanic ash and not basaltic basement which acts as a sink for Sr 2+ during in situ low-temperature weathering. The volcanic contribution to the strontium enrichment in the basal interstitial waters varies from 50% at site 336. The remaining Sr 2+ is derived from Sr-rich biogenic carbonate during diagenetic recrystallization to form Sr-poor calcite. (Auth.)

  11. Caribbean Reef Response to Plio-Pleistocene Climate Change: Results of the Dominican Republic Drilling Project (DRDP)

    Science.gov (United States)

    Klaus, J.; McNeill, D. F.; Diaz, V.; Swart, P. K.; Pourmand, A.

    2014-12-01

    Caribbean reefs changed profoundly in taxonomic composition, diversity, and dominance structure during late Pliocene and Pleistocene climatic change. These changes coincide with protracted climatic deterioration and cooling between 2.0 to 0.8 Ma, and the onset of high amplitude sea-level fluctuations ~400 ka. The Dominican Republic Drilling Project (DRDP) was initiated to determine how climate change and global high-amplitude sea level changes influenced depositional patterns in Pliocene to Recent reef systems of the Caribbean. A transect of 7 core borings (~700 m total depth) were collected along the southern coast of the DR. New age constraints based on U/Th geochronometry and radiogenic Sr isotopes, combined with depositional lithofacies, faunal indicators, and stable isotope profiles have allowed us to correlate between wells and define the internal anatomy and stratal geometry of the individual reef sigmoids and sigmoid sets. Faunal records suggest most extinction occurred prior to ~1 Ma. Following this extinction, fringing reef margins of the Caribbean display a characteristic zonation in which Acropora palmata dominates shallow high-energy reef crests and Acropora cervicornis calmer fore-reef slopes and backreef lagoons. The dominance of acroporids across this zonation has been attributed to growth rates 5-100 times faster than other corals.

  12. Nondestructive continuous physical property measurements of core samples recovered from hole B, Taiwan Chelungpu-Fault Drilling Project

    Science.gov (United States)

    Hirono, Tetsuro; Yeh, En-Chao; Lin, Weiren; Sone, Hiroki; Mishima, Toshiaki; Soh, Wonn; Hashimoto, Yoshitaka; Matsubayashi, Osamu; Aoike, Kan; Ito, Hisao; Kinoshita, Masataka; Murayama, Masafumi; Song, Sheng-Rong; Ma, Kuo-Fong; Hung, Jih-Hao; Wang, Chien-Ying; Tsai, Yi-Ben; Kondo, Tomomi; Nishimura, Masahiro; Moriya, Soichi; Tanaka, Tomoyuki; Fujiki, Toru; Maeda, Lena; Muraki, Hiroaki; Kuramoto, Toshikatsu; Sugiyama, Kazuhiro; Sugawara, Toshikatsu

    2007-07-01

    The Taiwan Chelungpu-Fault Drilling Project was undertaken in 2002 to investigate the faulting mechanism of the 1999 Mw 7.6 Taiwan Chi-Chi earthquake. Hole B penetrated the Chelungpu fault, and core samples were recovered from between 948.42- and 1352.60-m depth. Three major zones, designated FZB1136 (fault zone at 1136-m depth in hole B), FZB1194, and FZB1243, were recognized in the core samples as active fault zones within the Chelungpu fault. Nondestructive continuous physical property measurements, conducted on all core samples, revealed that the three major fault zones were characterized by low gamma ray attenuation (GRA) densities and high magnetic susceptibilities. Extensive fracturing and cracks within the fault zones and/or loss of atoms with high atomic number, but not a measurement artifact, might have caused the low GRA densities, whereas the high magnetic susceptibility values might have resulted from the formation of magnetic minerals from paramagnetic minerals by frictional heating. Minor fault zones were characterized by low GRA densities and no change in magnetic susceptibility, and the latter may indicate that these minor zones experienced relatively low frictional heating. Magnetic susceptibility in a fault zone may be key to the determination that frictional heating occurred during an earthquake on the fault.

  13. Fernald Environmental Management Project 1995 site environmental report summary

    International Nuclear Information System (INIS)

    1996-06-01

    This report summarizes the 1995 Site Environmental Report for the Fernald site. It describes the Fernald site mission, exposure pathways, and environmental standards and guidelines. An overview is presented of the impact these activities have on the local environment and public health. Environmental monitoring activities measure and estimate the amount of radioactive and nonradioactive materials that may leave the site and enter the surrounding environment

  14. Fernald Environmental Management Project 1995 site environmental report

    International Nuclear Information System (INIS)

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site's ongoing Environmental Monitoring Program. Also included in this report is information concerning the site's progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA

  15. Hominin Sites and Paleolakes Drilling Project. Chew Bahir, southern Ethiopia: How to get from three tonnes of sediment core to > 500 ka of continuous climate history?

    Science.gov (United States)

    Foerster, Verena; Asrat, Asfawossen; Cohen, Andrew S.; Gromig, Raphael; Günter, Christina; Junginger, Annett; Lamb, Henry F.; Schaebitz, Frank; Trauth, Martin H.

    2016-04-01

    In search of the environmental context of the evolution and dispersal of Homo sapiens and our close relatives within and beyond the African continent, the ICDP-funded Hominin Sites and Paleolakes Drilling Project (HSPDP) has recently cored five fluvio-lacustrine archives of climate change in East Africa. The sediment cores collected in Ethiopia and Kenya are expected to provide valuable insights into East African environmental variability during the last ~3.5 Ma. The tectonically-bound Chew Bahir basin in the southern Ethiopian rift is one of the five sites within HSPDP, located in close proximity to the Lower Omo River valley, the site of the oldest known fossils of anatomically modern humans. In late 2014, the two cores (279 and 266 m long respectively, HSPDP-CHB14-2A and 2B) were recovered, summing up to nearly three tonnes of mostly calcareous clays and silts. Deciphering an environmental record from multiple records, from the source region of modern humans could eventually allow us to reconstruct the pronounced variations of moisture availability during the transition into Middle Stone Age, and its implications for the origin and dispersal of Homo sapiens. Here we present the first results of our analysis of the Chew Bahir cores. Following the HSPDP protocols, the two parallel Chew Bahir sediment cores have been merged into one single, 280 m long and nearly continuous (>90%) composite core on the basis of a high resolution MSCL data set (e.g., magnetic susceptibility, gamma ray density, color intensity transects, core photographs). Based on the obvious cyclicities in the MSCL, correlated with orbital cycles, the time interval covered by our sediment archive of climate change is inferred to span the last 500-600 kyrs. Combining our first results from the long cores with the results from the accomplished pre-study of short cores taken in 2009/10 along a NW-SE transect across the basin (Foerster et al., 2012, Trauth et al., 2015), we have developed a hypothesis

  16. Drill cuttings mount formation study

    Science.gov (United States)

    Teh, Su Yean; Koh, Hock Lye

    2014-07-01

    Oil, Gas and Energy sector has been identified as an essential driving force in the Malaysian Economic Transformation Programs (ETP). Recently confirmed discovery of many offshore oil and gas deposits in Malaysian waters has ignited new confidence in this sector. However, this has also spurred intense interest on safeguarding the health and environment of coastal waters in Malaysia from adverse impact resulting from offshore oil and gas production operation. Offshore discharge of spent drilling mud and rock cuttings is the least expensive and simplest option to dispose of large volumes of drilling wastes. But this onsite offshore disposal may have adverse environmental impacts on the water column and the seabed. It may also pose occupational health hazards to the workers living in the offshore platforms. It is therefore important to model the transport and deposition of drilling mud and rock cuttings in the sea to enable proper assessment of their adverse impacts on the environment and the workers. Further, accumulation of drill particles on the seabed may impede proper operation of pipelines on the seabed. In this paper, we present an in-house application model TUNA-PT developed to cater to local oil and gas industry needs to simulate the dispersion and mount formation of drill cuttings by offshore oil and gas exploration and production platforms. Using available data on Malaysian coastal waters, simulation analyses project a pile formation on the seabed with a maximum height of about 1 m and pile radius of around 30 to 50 m. Simulated pile heights are not sensitive to the heights of release of the cuttings as the sensitivity has been mitigated by the depth of water.

  17. Housing projects in Trabzon: Marketting discourses and physical environmental features

    OpenAIRE

    AYDIN TÜRK, Yelda; KARADENİZ, Beyza

    2018-01-01

    Thehousing projects, that have turned into concept projects promoted as acommodity since last decade in Turkey. These projects, are marketed withdiscourses such as “the long-awaited life”, “ideal home” and are constructed onthe urban fringes. In this study, the housing projects that developed inTrabzon in recent years have been examined in this context. Marketing discourseand physical environmental characteristics of the projects have been analyzed.Thus, the study finds out to what extent the...

  18. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  19. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  20. Environmental assessment for the Groundwater Characterization Project, Nevada Test Site, Nye County, Nevada

    International Nuclear Information System (INIS)

    1992-08-01

    The US Department of Energy (DOE) proposes to conduct a program to characterize groundwater at the Nevada Test Site (NTS), Nye County, Nevada, in accordance with a 1987 DOE memorandum stating that all past, present, and future nuclear test sites would be treated as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites (Memorandum from Bruce Green, Weapons Design and Testing Division, June 6, 1987). DOE has prepared an environmental assessment (DOE/EA-0532) to evaluate the environmental consequences associated with the proposed action, referred to as the Groundwater Characterization Project (GCP). This proposed action includes constructing access roads and drill pads, drilling and testing wells, and monitoring these wells for the purpose of characterizing groundwater at the NTS. Long-term monitoring and possible use of these wells in support of CERCLA, as amended by the Superfund Amendments and Reauthorization Act, is also proposed. The GCP includes measures to mitigate potential impacts on sensitive biological, cultural and historical resources, and to protect workers and the environment from exposure to any radioactive or mixed waste materials that may be encountered. DOE considers those mitigation measures related to sensitive biological, cultural and historic resources as essential to render the impacts of the proposed action not significant, and DOE has prepared a Mitigation Action Plan (MAP) that explains how such mitigations will be planned and implemented. Based on the analyses presented in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement is not required and the Department is issuing this FONSI

  1. Environmental assessment for the Groundwater Characterization Project, Nevada Test Site, Nye County, Nevada; Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-08-01

    The US Department of Energy (DOE) proposes to conduct a program to characterize groundwater at the Nevada Test Site (NTS), Nye County, Nevada, in accordance with a 1987 DOE memorandum stating that all past, present, and future nuclear test sites would be treated as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites (Memorandum from Bruce Green, Weapons Design and Testing Division, June 6, 1987). DOE has prepared an environmental assessment (DOE/EA-0532) to evaluate the environmental consequences associated with the proposed action, referred to as the Groundwater Characterization Project (GCP). This proposed action includes constructing access roads and drill pads, drilling and testing wells, and monitoring these wells for the purpose of characterizing groundwater at the NTS. Long-term monitoring and possible use of these wells in support of CERCLA, as amended by the Superfund Amendments and Reauthorization Act, is also proposed. The GCP includes measures to mitigate potential impacts on sensitive biological, cultural and historical resources, and to protect workers and the environment from exposure to any radioactive or mixed waste materials that may be encountered. DOE considers those mitigation measures related to sensitive biological, cultural and historic resources as essential to render the impacts of the proposed action not significant, and DOE has prepared a Mitigation Action Plan (MAP) that explains how such mitigations will be planned and implemented. Based on the analyses presented in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement is not required and the Department is issuing this FONSI.

  2. Fernald Environmental Management Project 1995 site environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA.

  3. An assessment of surface mud system design options for minimizing the health, safety, and environmental impact concerns associated with drilling fluids

    International Nuclear Information System (INIS)

    Minton, R.C.; Bailey, M.G.

    1991-01-01

    In this paper a drilling fluid surface system design concept is proposed that resolves the Environmental, occupational hygiene and safety issues associated with conventional designs. Automation of the chemical handling and dosing system is the central element of the concept which, when fully integrated into the system, permits a significant reduction in the surface volume requirements. This, in turn, results in weight and capital cost savings, offsetting the cost of the processing and treatment plant, and a smaller overall footprint for the system. Adoption of the design philosophy results in a safe, healthy working environment in which all of the waste streams are managed so as to minimize the overall environmental impact of the drilling process

  4. A vision for drilling

    Energy Technology Data Exchange (ETDEWEB)

    Millheim, K. [Montanuniversitaet Leoben (Austria)

    1995-12-31

    The future of drilling lies in its relationship with the oil and gas industry. This paper examines how the future of drilling is seen from the view point of the exploration manager, the drilling contractor, the drilling engineer and the company president or managing director. The various pressures on the oil and gas industry are examined, such as environmental issues, alternative energy sources, and the price of oil which determines how companies are run. Exploration activity is driven by the price of oil and gas. The development of wells with multiple horizontal wells or multiple horizontal wells with tributaries will reduce the cost of exploration. Companies will rely less and less on reservoir simulation and more on cheap well-bores, multi-lateral well-bores and will exploit oil that could not be exploited before. The cost of exploratory drilling will need to be kept down so that in the future the industry will get better at economically finding fields at the 10 million to 20 million barrel range that would not have been possible before. The future is expected to see drilling contractors tunnelling, making sewerage lines and drilling 10,000 foot wells with purpose built rigs. Franchising will become a feature of the industry as will the use of databases to answer key technical questions. Offshore platforms will be built to be moveable and disposable. The industry is capable of solving problems, meeting challenges and making ideas work, providing much hope for the future. 10 figs., 1 photo.

  5. Drilling cost analysis

    International Nuclear Information System (INIS)

    Anand, A.B.

    1992-01-01

    Drilling assumes greater importance in present day uranium exploration which emphasizes to explore more areas on the basis of conceptual model than merely on surface anomalies. But drilling is as costly as it is important and consumes a major share (50% to 60%) of the exploration budget. As such the cost of drilling has great bearing on the exploration strategy as well as on the overall cost of the project. Therefore, understanding the cost analysis is very much important when planning or intensifying an exploration programme. This not only helps in controlling the current operations but also in planning the budgetary provisions for future operations. Also, if the work is entrusted to a private party, knowledge of in-house cost analysis helps in fixing the rates of drilling in different formations and areas to be drilled. Under this topic, various factors that contribute to the cost of drilling per meter as well as ways to minimize the drilling cost for better economic evaluation of mineral deposits are discussed. (author)

  6. Use of spectral gamma ray as a lithology guide for fault rocks: A case study from the Wenchuan Earthquake Fault Scientific Drilling project Borehole 4 (WFSD-4).

    Science.gov (United States)

    Amara Konaté, Ahmed; Pan, Heping; Ma, Huolin; Qin, Zhen; Guo, Bo; Yevenyo Ziggah, Yao; Kounga, Claude Ernest Moussounda; Khan, Nasir; Tounkara, Fodé

    2017-10-01

    The main purpose of the Wenchuan Earthquake Fault Scientific drilling project (WFSD) was to produce an in-depth borehole into the Yingxiu-Beichuan (YBF) and Anxian-Guanxian faults in order to gain a much better understanding of the physical and chemical properties as well as the mechanical faulting involved. Five boreholes, namely WFSD-1, WFSD-2, WFSD-3P, WFSD-3 and WFSD-4, were drilled during the project entirety. This study, therefore, presents first-hand WFSD-4 data on the lithology (original rocks) and fault rocks that have been obtained from the WFSD project. In an attempt to determine the physical properties and the clay minerals of the lithology and fault rocks, this study analyzed the spectral gamma ray logs (Total gamma ray, Potassium, Thorium and Uranium) recorded in WFSD-4 borehole on the Northern segment of the YBF. The obtained results are presented as cross-plots and statistical multi log analysis. Both lithology and fault rocks show a variability of spectral gamma ray (SGR) logs responses and clay minerals. This study has shown the capabilities of the SGR logs for well-logging of earthquake faults and proves that SGR logs together with others logs in combination with drill hole core description is a useful method of lithology and fault rocks characterization. Copyright © 2017 Elsevier Ltd. All rights reserved.

  7. Reconstruction of the Paleoproterozoic deeper ocean environment: Preliminary Report of the Ghana Birimian Greenstone Belt Drilling Project (GHB)

    Science.gov (United States)

    Kiyokawa, S.; Yoshimaru, S.; Miki, T.; Sakai, S.; Ikehara, M.; Yamaguchi, K. E.; Ito, T.; Onoue, T.; Takehara, M.; Tetteh, G. M.; Nyame, F. K.

    2016-12-01

    The Paleoproterozoic Era are one of the most rapid environmental change when the earth surface environment was affected by formation of continents and increasing atmospheric oxygen levels. Major oxidation of Great Oxidation Event (GOE) are reported this ages (eg. Holland, 2006; Condie, 2001; Lyons et al., 2014). The nature of deep sea environments at this time have not been clearly identified and oceanic sediments are mostly involved in subduction. The Paleoproterozoic Birimian Greenstone Belt is an ophiolitic volcaniclastic sequence in Ghana, with depositional age of over 2.3-2.2 Ga (Petersson et al., 2016). Detail research was conducted of the Ashanti (Axim-Konongo) Belt of the Birimian Greenstone Belt along the coast near Cape Three Points area. Very thick volcaniclastic and organic-rich sedimentary rocks, which we now refer to as the Cape Three Points Group, crop out in the lower part of the Birimian Greenstone Belt. Stratigraphically, three unit identified; the lower portion contains thick vesicular volcaniclastic rocks, the middle portion is made up of laminated volcaniclastics and black shale, and the upper portion dominated by fine laminated volcaniclastics with more black shale sequence. Continuous core drilling from Dec 3-12th 2015 of the upper part of the sequence intersected saprolite to a depth of 30m and fresh, well preserved stratigraphy with graded bedding and lamination to a depth of 195m. Half cut cores show well laminated organic rich black shale and relative carbonate rich layers with very fine pyrite grains. SHRIMP age data from a porphyry intrusion into this sequence indicate an age of 2250 Ma. Carbon isotope analysis shows δ13C = -43 to -37‰ for black shale with the very light isotope values for cyanobacterial signature.The fining-upward sequences, well laminated bed and black shales and REE data suggest this sequence situated partly silent stagnant with volcanic activity ocean floor environment around an oceanic island arc condition.

  8. Final report Hanford environmental compliance project 89-D-172

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-01-01

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations

  9. Structural and physical property characterization in the Wenchuan earthquake Fault Scientific Drilling project — hole 1 (WFSD-1)

    Science.gov (United States)

    Li, Haibing; Xu, Zhiqin; Niu, Yixiong; Kong, Guangsheng; Huang, Yao; Wang, Huan; Si, Jialiang; Sun, Zhiming; Pei, Junling; Gong, Zheng; Chevalier, Marie-Luce; Liu, Dongliang

    2014-04-01

    The Wenchuan earthquake Fault Scientific Drilling project (WFSD) started right after the 2008 Mw 7.9 Wenchuan earthquake to investigate its faulting mechanism. Hole 1 (WFSD-1) reached the Yingxiu-Beichuan fault (YBF), and core samples were recovered from 32 to 1201.15 m-depth. Core investigation and a suite of geophysical downhole logs (including P-wave velocity, natural gamma ray, self-potential, resistivity, density, porosity, temperature, magnetic susceptibility and ultrasound borehole images) were acquired in WFSD-1. Integrated studies of cores and logs facilitate qualitative and quantitative comparison of the structures and physical properties of rocks. Logging data revealed that the geothermal gradient of the volcanic Pengguan complex (above 585.75 m) is 1.85 °C/100 m, while that of the sedimentary Xujiahe Formation (below 585.75 m) is 2.15 °C/100 m. In general, natural gamma ray, resistivity, density, porosity, P-wave velocity and magnetic susceptibility primarily depend on the rock lithology. All major fault zones are characterized by high magnetic susceptibility, low density and high porosity, with mostly low resistivity, high natural gamma ray and sound wave velocity. The high magnetic susceptibility values most likely result from the transformation of magnetic minerals by frictional heating due to the earthquake. The YBF exposed in WFSD-1 can be subdivided into five different parts based on different logging responses, each of them corresponding to certain fault-rocks. The high gamma radiation, porosity and P-wave velocity, as well as low resistivity and temperature anomalies indicate that the Wenchuan earthquake fault zone is located at 585.75-594.5 m-depth, with an average inclination and dip angle of N305° and 71°, respectively. The fact that the fracture directions in the hanging wall and footwall are different suggests that their stress field direction is completely different, implying that the upper Pengguan complex may not be local.

  10. The Changing Face of Plio-Pleistocene Reef Margins: Results of the Dominican Republic Drilling Project (DRDP)

    Science.gov (United States)

    Klaus, J.; McNeill, D. F.; Díaz, V.; Swart, P. K.; Pourmand, A.; Grasmueck, M.; Eberli, G. P.

    2013-12-01

    Fringing reef margins of the Caribbean display a characteristic zonation in which Acropora palmata dominates shallow high-energy reef crests and Acropora cervicornis calmer fore-reef slopes and backreef lagoons. The dominance of acroporids across this zonation has been attributed to growth rates 5-100 times faster than other corals. However, the dominance and high accretion potential of acroporid reefs has a relatively recent geologic origin. Caribbean reefs changed profoundly in taxonomic composition, diversity, and dominance structure during late Pliocene and Pleistocene climatic change. These changes coincide with protracted climatic deterioration and cooling between 2.0 to 0.8 Ma, and the onset of high amplitude sea-level fluctuations ~400 ka. The Dominican Republic Drilling Project (DRDP) was initiated to determine how climate change and global high-amplitude sea level changes influenced depositional patterns in Pliocene to Recent reef systems of the Caribbean. A transect of 7 core borings (~700 m total depth) were collected along a transect of the southern coast of the DR in conjunction with over 20 km of ground penetrating radar (GPR) lines. New age constraints based on U/Th geochronometry and radiogenic Sr isotopes, combined with depositional lithofacies, faunal indicators, stable isotope profiles and GPR data have allowed us to correlate between wells and define the internal anatomy and stratal geometry of the individual reef sigmoids and sigmoid sets. The stacking of these sigmoid-shaped reefs produce lateral progradation of approximately 15 km with geometries that generally follow the highstand systems tract model of Pomar and Ward (1994). Based on existing age models eccentricity (high amplitude 100 kyr) sigmoids display increased aggradation and progradation potential compared to reef cycles driven by obliquity (41 kyr).

  11. The Campi Flegrei Deep Drilling Project: using borehole measurements to discriminate magmatic and geothermal effects in caldera unrest

    Science.gov (United States)

    De Natale, Giuseppe; Troise, Claudia; Carlino, Stefano; Troiano, Antonio; Giulia Di Giuseppe, Maria; Piochi, Monica; Somma, Renato; Tramelli, Anna; Kilburn, Christopher

    2015-04-01

    Large calderas are potentially the most risky volcanic areas in the world since they are capable of producing huge eruptions whose major effects can involve human life and activities from regional to global scale. Calderas worldwide are characterized by frequent episodes of unrest which, only in few cases, culminate with eruptions. This ambiguous behavior is generally explained in terms of magma intrusion or disturbance of geothermal fluids in the shallow crust, which are both source of ground deformations and seismicity. A major goal is to determine the relative contribution of each process, because the potential for eruptions significantly enhanced if magma movements emerge as the primary component. A very important case study is the active Campi Flegrei caldera, hosting part of the large city of Naples (Southern Italy). In the framework of the Campi Flegrei Deep Drilling Project new filed data from pilot borehole have been recorded (permeability and in situ stress) by using a novel procedure of Leak Off Test. These new data, particularly the actual permeability, are fundamental to calibrate the caldera unrest models at Campi Flegrei and, , to put constrains to forecast the maximum future eruptive scenario. We show here that these new data, integrated by fluid-dynamical modeling, allow to assess that only about a third of the maximum uplift recorded in 1982-1984 may be due to shallow aquifer perturbation, so that the remaining part should be due to magma inflow, corresponding to about 0.05 Km3 of new magma if we assume a sill-like reservoir located at 4 km of depth. Considering an almost equivalent magma inflow for the 1969-1972 unrest, which showed a similar uplift, we got a total magma inflow of 0.1 Km3. It is then very important to assess the times for cooling of such accumulated magma, in order to assess the eruption hazard.

  12. Environmental impacts of wind-energy projects

    National Research Council Canada - National Science Library

    Committee on Environmental Impacts of Wind Energy Projects, National Research Council

    2007-01-01

    .... Although the use of wind energy to generate electricity is increasing rapidly in the United States, government guidance to help communities and developers evaluate and plan proposed wind-energy projects is lacking...

  13. Environmental Assessment: Geothermal Energy Geopressure Subprogram. Gulf Coast Well Drilling and Testing Activity (Frio, Wilcox, and Tuscaloosa Formations, Texas and Louisiana)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-09-01

    The Department of Energy (DOE) has initiated a program to evaluate the feasibility of developing the geothermal-geopressured energy resources of the Louisiana-Texas Gulf Coast. As part of this effort, DOE is contracting for the drilling of design wells to define the nature and extent of the geopressure resource. At each of several sites, one deep well (4000-6400 m) will be drilled and flow tested. One or more shallow wells will also be drilled to dispose of geopressured brines. Each site will require about 2 ha (5 acres) of land. Construction and initial flow testing will take approximately one year. If initial flow testing is successful, a continuous one-year duration flow test will take place at a rate of up to 6400 m{sup 3} (40,000 bbl) per day. Extensive tests will be conducted on the physical and chemical composition of the fluids, on their temperature and flow rate, on fluid disposal techniques, and on the reliability and performance of equipment. Each project will require a maximum of three years to complete drilling, testing, and site restoration.

  14. Slant rigs offer big payoffs in shallow drilling

    International Nuclear Information System (INIS)

    Smith, J.; Edwards, B.

    1992-01-01

    Slant hole drilling technology can result in considerable savings over conventionally drilled deviated holes because mud motors and deviation control with measurement while drilling tools are usually unnecessary. The benefits of using slant hole rigs for development drilling improve after the bit walk tendencies and the correct bottom hole assemblies have been determined for a particular area. This article discusses three recent drilling operations that successfully used slant drilling technology on land-based projects: drilling for heavy oil in Alberta, drilling for gas in Alberta, and drilling a river crossing for a gas pipeline in British Columbia. These examples demonstrate the flexibility of slant drilling technology

  15. A statistical proposal for environmental impact assessment of development projects

    International Nuclear Information System (INIS)

    Plazas C, Julian A; De J Lema T, Alvaro; Leon P, Juan Diego

    2009-01-01

    Environmental impact assessment of development projects is a fundamental process, which main goal is to avoid that their construction and functioning, lead to serious and negative consequences on the environment. Some of the most important limitations of the models employed to assess environmental impacts, are the subjectivity of its parameters and weights, and the multicolineality among the variables, which represent high quantities of similar information. This work presents a multivariate statistical-based method that tries to diminish such limitations. For this purpose, environmental impact assessment, is valuated through different environmental impact attributes and environmental elements, synthesized in an environmental quality index (ICA in Spanish). ICA can be applied at different levels, such as at a project level, or applied only at a partial level on one or some environmental components.

  16. Overview of the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.; Napier, B.A.; Ikenberry, T.A.

    1992-04-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that specific and representative individuals and populations may have received as a result of releases of radioactive materials from historical operations at the Hanford Site. These dose estimates would account for the uncertainties of information regarding facilities operations, environmental monitoring, demography, food consumption and lifestyles, and the variability of natural phenomena. Other objectives of the HEDR Project include: supporting the Hanford Thyroid Disease Study (HTDS), declassifying Hanford-generated information and making it available to the public, performing high-quality, credible science, and conducting the project in an open, public forum. The project is briefly described

  17. Beverley project: draft environmental impact statement

    International Nuclear Information System (INIS)

    1982-07-01

    The Beverley deposit is located on the northern Lake Frome Plains, South Australia, 520km north of Adelaide. It is proposed to mine the deposit by in-situ leaching and to process the solution on the surface to produce an estimated 11,600t of yellowcake from about 6 million tonnes of 0.27% ore over approximately 23 years. The draft environmental impact statement is intended to cover all stages of the development from the pilot plant to final rehabilitation. Sections include the existing environment (geology, climate and meteorology, soils, hydrology, ecology, radionuclide base levels, land use, population and sites of Aboriginal and archaeological significance), the proposed development (solution mining, waste management, water management and mining and processing options), rehabilitation, environmental impact and environmental management and monitoring

  18. Jabiluka project - Draft Environmental Impact Statement. Appendices

    International Nuclear Information System (INIS)

    1996-01-01

    The Appendices provide various technical data in support of studies presented in the Main Report, including the guidelines for an EIS at Jabiluka, environmental requirements, waste management plan, water management system criteria, water quality data, transport licensing and security procedures, rehabilitation plus specialist studies into ore characteristics, noise issues and haulage risk assessment. Copyright (1996) Energy Resources of Australia Limited

  19. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  20. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  1. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  2. The Narssaq-project - a geochemical, ecological environmental research project

    International Nuclear Information System (INIS)

    Soerensen, H.; Rose-Hansen, J.

    1978-01-01

    Two types of mineral occurrences near the town of Narssaq in South Greenland are recorded to be worth mining in the near future: the uranium occurrences at Kvanefjeld in the northern part of the Ilimaussaq intrusion and the zirconium occurrences in the southern part on the south coast of the Kangerdluarssuk fjord. Consideration of the environment plays a large part in discussions regarding the exploitation of these minerals. A report is given of the geochemical, ecological environmental investigations carried out at Narssaq since 1974. (BP)

  3. Preliminary report on the geology of the Red River Valley drilling project, eastern North Dakota and northwestern Minnesota

    International Nuclear Information System (INIS)

    Moore, W.L.

    1979-01-01

    Thirty-two wells, 26 of which penetrated the Precambrian, were drilled along the eastern edge of the Williston Basin in the eastern tier of counties in North Dakota and in nearby counties in northwestern Minnesota. These tests, along the Red River Valley of the North, were drilled to study the stratigraphy and uranium potential of this area. The drilling program was unsuccessful in finding either significant amounts of uranium or apparently important shows of uranium. It did, however, demonstrate the occurrence of thick elastic sections in the Ordovician, Jurassic and Cretaceous Systems, within the Red River Valley, along the eastern margins of the Williston Basin which could serve as host rocks for uranium ore bodies

  4. Drilling reorganizes

    Science.gov (United States)

    Richman, Barbara T.

    As the first in a proposed series of steps that would move scientific ocean drilling from its own niche within the National Science Foundation's (NSF) Directorate for Astronomical, Atmospheric, Earth, and Ocean Sciences (AAEO) into the agency's Division of Ocean Sciences, Grant Gross, division director, has been appointed acting director of the Office of Scientific Ocean Drilling (OSOD). Gross will retain the directorship of the division, which also is part of AAEO. Allen M. Shinn, Jr., OSOD director for nearly 2 years, has been reassigned effective July 10 to a position in NSF's Office of Planning and Resource Management.The move aims to tie drilling operations more closely to the science with which it is associated, Gross said. This first step is an organizational response to the current leaning toward using a commercial drilling vessel as the drilling platform, he said. Before the market for such commercial drill ships opened (Eos, February 22, 1983, p . 73), other ship options for scientific ocean drilling included refurbishing the aging Glomar Challenger or renovating, at great expense, the Glomar Explorer. A possible next step in the reorganization is to make OSOD the third section within the Ocean Sciences Division. Currently, the division is divided into the Oceanographic Facilities and Support Section and the Ocean Sciences Research Section.

  5. Evaluation Of The Risk Of Financing Projects Of Environmental Protection

    Directory of Open Access Journals (Sweden)

    Gabriela Cornelia PICIU

    2012-03-01

    Full Text Available The research project approaches multidimensionally the financing of environmental protection from the perspective of directing, correlating and consolidating the financial flows circumscribed to the regeneration of an economy affected by environmental deterioration due to the very activities defining the economic mechanisms and circuits. The purpose of the project is to identify, by scientific, methodological and empirical analysis of the concepts, principles and arguments imposed by the economic theory, the risks of financing the projects of environmental projects and to evaluate their effects because their neglecting, individual approach or erroneous dimensioning might have unfavourable and unforeseen consequences in terms of the efficiency of the environmental strategies and policies. The objective of the study is the reveal the interdependency and interaction between the flows and circuits financing the environmental projects, showing the necessity for punctual, distributive, correlative and multiplicative financing of the environmental protection. This must be done from an expanded and prospective spatial and temporal vision by a compositional approach of the risk for environmental investments within the complex network of the social, economic and financial risks generated by the global system of the human praxis focused on the binomial of the human-environment interdependence.

  6. SIHTI 2. Energy and environmental technology. Yearbook 1995. Project presentations

    International Nuclear Information System (INIS)

    Korhonen, M.; Thun, R.

    1997-01-01

    Detrimental impacts of various energy production forms, their prevention and costs to enterprises and to the society are studied in the National Research Programme on Energy and Environmental Technology - SIHTI 2. For this evaluation work databases on Finland's energy production, fuels and boilers and emissions of various production forms are needed. This is one of the main subtasks of the SIHTI Programme. Development of methods and tools required for environmental decision making and for the assessment of environmental costs and testing of their usability and reliability are equally important. Emission measurements are a problem field that continuously sets new challenges. In addition to energy production and its environmental impacts, environmental issues of the woodprocessing industries form another important research field of SIHTI 2 programme. A common aim of both fields is to reduce emissions of detrimental substances, to recycle raw materials, and to minimise and reuse wastes. Research and development projects are being carried out by a number of universities of different fields of science and technology, by research organisations and enterprises, and many projects are realised in close co-operation. In 1995, the programme comprised 28 R and D projects by universities and 22 enterprise-led projects. Results of these projects are presented in this yearbook. Part of the research projects continued from the preceding year and part were new projects continuing in 1996

  7. Geothermal environmental projects publication list with abstracts 1975-1978

    Energy Technology Data Exchange (ETDEWEB)

    Ricker, Y.E.; Anspaugh, L.R.

    1979-05-15

    This report contains 119 abstracts of publication resulting from or closely related to geothermal environmental projects conducted by the Environmental Sciences Division at Lawrence Livermore Laboratory. Publications are listed chronologically from 1975 through 1978. The main entries are numbered sequentially, and include the full citation, an abstract, and selected keywords. This section is followed by an author index, and a keyword index.

  8. Olympic Dam project: draft environmental impact statement

    International Nuclear Information System (INIS)

    1982-10-01

    The Olympic Dam deposit, South Australia, is estimated to contain at least 2,000 million tonnes of mineralized material, with an average grade of about 1.6% copper, 0.6 Kg/t of uranium oxide and 0.6 g/t of gold. The objective of the project is to extract and process the ore for the production and sale of copper, uranium oxide and the associated gold and silver. Facilities required are an underground mine, an on-site processing plant, associated facilities including a tailings retention system, a town to accommodate up to 9,000 people and other infrastructure. Chapters in the draft E.I.S. contain information on the environment, land use, aboriginal environment, geology, tailings retention system, radiation assessment, project infrastructure, social effects and economic effects

  9. Griffith energy project final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information

  10. Griffith Energy Project Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  11. HYDRATE CORE DRILLING TESTS

    Energy Technology Data Exchange (ETDEWEB)

    John H. Cohen; Thomas E. Williams; Ali G. Kadaster; Bill V. Liddell

    2002-11-01

    The ''Methane Hydrate Production from Alaskan Permafrost'' project is a three-year endeavor being conducted by Maurer Technology Inc. (MTI), Noble, and Anadarko Petroleum, in partnership with the U.S. DOE National Energy Technology Laboratory (NETL). The project's goal is to build on previous and ongoing R&D in the area of onshore hydrate deposition. The project team plans to design and implement a program to safely and economically drill, core and produce gas from arctic hydrates. The current work scope includes drilling and coring one well on Anadarko leases in FY 2003 during the winter drilling season. A specially built on-site core analysis laboratory will be used to determine some of the physical characteristics of the hydrates and surrounding rock. Prior to going to the field, the project team designed and conducted a controlled series of coring tests for simulating coring of hydrate formations. A variety of equipment and procedures were tested and modified to develop a practical solution for this special application. This Topical Report summarizes these coring tests. A special facility was designed and installed at MTI's Drilling Research Center (DRC) in Houston and used to conduct coring tests. Equipment and procedures were tested by cutting cores from frozen mixtures of sand and water supported by casing and designed to simulate hydrate formations. Tests were conducted with chilled drilling fluids. Tests showed that frozen core can be washed out and reduced in size by the action of the drilling fluid. Washing of the core by the drilling fluid caused a reduction in core diameter, making core recovery very difficult (if not impossible). One successful solution was to drill the last 6 inches of core dry (without fluid circulation). These tests demonstrated that it will be difficult to capture core when drilling in permafrost or hydrates without implementing certain safeguards. Among the coring tests was a simulated hydrate

  12. The Project-Based Learning Approach in Environmental Education

    Science.gov (United States)

    Genc, Murat

    2015-01-01

    The purpose of this study is to investigate the effect of project-based learning on students' attitudes toward the environment. In the study that was performed with 39 students who take the "Environmental Education" course, attitude changes toward the environment were investigated in students who developed projects on environmental…

  13. 78 FR 2685 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental...

    Science.gov (United States)

    2013-01-14

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental Assessment AGENCY: Office of the Assistant Secretary... assessment for the East Hobble Creek Restoration Project is available for public review and comment. The...

  14. Domestic environmental requirements, new and projected

    Energy Technology Data Exchange (ETDEWEB)

    McLean, B.J. [Environmental Protection Agency, Washington, DC (United States)

    1997-12-31

    The paper outlines and/or gives data on the following: environmental concerns; goal of Title IV; national SO{sub 2} emissions; reductions in wet sulfate deposition; SO{sub 2} allowance program--benefits and costs; utility NO{sub x} emissions; NO{sub x} compliance options; cost effectiveness of NO{sub x} control; electric power regulations timeline; Clean Air power initiative; what a new approach would look like; and an analysis of NO{sub x} and SO{sub 2} cap and trade scenarios.

  15. Environmental concerns drive project planning and design

    International Nuclear Information System (INIS)

    Hamilton, G.M.

    1994-01-01

    This paper describes the measures used to retrofit and requalify a Northwest Pipeline Corp., pipeline near Seattle, Washington. The pipeline is a 26 inch transmission line which has lost operating pressure because of the growth in Seattle's population. The pipeline was redesigned to requalify to a maximum pressure of 809 pounds per square inch. The paper describes the environmental issues faced during the construction and reconstruction efforts to protect wetlands and dispose of pipeline wastes. It describes the methods for cleaning the inside of the pipelines using various chemicals and cleaning tools

  16. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  17. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  18. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  19. The 40Ar/39Ar dating of core recovered by the Hawaii Scientific Drilling Project (phase 2), Hilo, Hawaii

    Science.gov (United States)

    Sharp, Warren D.; Renne, Paul R.

    2005-04-01

    The Hawaii Scientific Drilling Project, phase 2 (HSDP-2), recovered core from a ˜3.1-km-thick section through the eastern flanks of Mauna Loa and Mauna Kea volcanoes. We report results of 40Ar/39Ar incremental heating by broad-beam infrared laser of 16 basaltic groundmass samples and 1 plagioclase separate, mostly from K-poor tholeiites. The tholeiites generally have mean radiogenic 40Ar enrichments of 1-3%, and some contain excess 40Ar; however, isochron ages of glass-poor samples preserve stratigraphic order in all cases. A 246-m-thick sequence of Mauna Loa tholeiitic lavas yields an isochron age of 122 ± 86 kyr (all errors 2σ) at its base. Beneath the Mauna Loa overlap sequence lie Mauna Kea's postshield and shield sequences. A postshield alkalic lava yields an age of 236 ± 16 kyr, in agreement with an age of 240 ± 14 kyr for a geochemically correlative flow in the nearby HSDP-1 core hole, where more complete dating of the postshield sequence shows it to have accumulated at 0.9 ± 0.4 m/kyr, from about 330 to <200 ka. Mauna Kea's shield consists of subaerial tholeiitic flows to a depth of 1079 m below sea level, then shallow submarine flows, hyaloclastites, pillow lavas, and minor intrusions to core bottom at 3098 m. Most subaerial tholeiitic flows fail to form isochrons; however, a sample at 984 m yields an age of 370 ± 180 kyr, consistent with ages from similar levels in HSDP-1. Submarine tholeiites including shallow marine vitrophyres, clasts from hyaloclastites, and pillow lavas were analyzed; however, only pillow lava cores from 2243, 2614, and 2789 m yield reliable ages of 482 ± 67, 560 ± 150, and 683 ± 82 kyr, respectively. A linear fit to ages for shield samples defines a mean accumulation rate of 8.6 ± 3.1 m/kyr and extrapolates to ˜635 kyr at core bottom. Alternatively, a model relating Mauna Kea's growth to transport across the Hawaiian hot spot that predicts downward accelerating accumulation rates that reach ˜20 m/kyr at core bottom (De

  20. Final environmental statement related to the operation of the Teton Uranium ISL Project (Docket No). 40-8781

    International Nuclear Information System (INIS)

    1983-08-01

    This Final Environmental Impact Statement is issued by the US Nuclear Regulatory Commission in response to the request by Teton Exploration Drilling, Inc. for the issuance of an NRC Source and Byproduct Material License authorizing operation of the proposed Teton Project to mine uranium in situ by injecting a carbonate/bicarbonate lixiviant into the ore body. The statement considers: (1) alternative of no licensing action, (2) alternative energy sources, and (3) alternatives if uranium ore is mined and refined on the site. The proposed action is to grant a Source and Byproduct Material License to the applicant subject to the stipulated license condition

  1. International environmental issues and requirements for new power projects

    Energy Technology Data Exchange (ETDEWEB)

    Newman, J.R. [Golder Associates Inc., Gainesville, FL (United States); Maltby, J.H. [Golder Associates Inc., Washington, DC (United States)

    1997-12-31

    The purpose of this presentation was to discuss the emerging role of financial entities in determining environmental requirements for international power projects. The paper outlines the following: emerging conditions; examples of announced privatization energy projects by country; types of government and international financial entity sources; problems for IPPs; similarity and differences between the World Bank and the USEPA; comparison of the international standards and regulations for power plants; recent trends/issues involving international power project approval; and recommendations for understanding/expediting the financial entities` environmental approval process and how to expedite this process.

  2. A bar coding system for environmental projects

    International Nuclear Information System (INIS)

    Barber, R.B.; Hunt, B.J.; Burgess, G.M.

    1988-01-01

    This paper presents BeCode systems, a bar coding system which provides both nuclear and commercial clients with a data capture and custody management program that is accurate, timely, and beneficial to all levels of project operations. Using bar code identifiers is an essentially paperless and error-free method which provides more efficient delivery of data through its menu card-driven structure, which speeds collection of essential data for uploading to a compatible device. The effects of this sequence include real-time information for operator analysis, management review, audits, planning, scheduling, and cost control

  3. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  4. Integrating TOM into environmental projects, Angela B. Quinlan

    International Nuclear Information System (INIS)

    Caldwell, J.A.

    1992-01-01

    Responsible and cost-effective waste management and environmental restoration are best achieved when the principles and procedures of Total Quality Management are made an integral part of the process. By describing three case histories, we explore and explain techniques for using TQM in environmental projects. Key aspects considered include: quality measurement systems; establishing and maintaining standard operating procedures; management and technical peer review; the use of Quality Improvement Teams; Roadmapping (a new procedure that the US Department of Energy is incorporating into environmental restoration programs); and the role of audit teams in document production. The three case histories covered include: The Department of Energy's Uranium Mill Tailings Remedial Action Project on which Roadmapping and Quality Improvement Teams have led to significant changes in procedures; the EPA ARCS program on which adoption of project management Standard Operating Procedures enhanced cost and schedule control; the Jacobs Engineering TQM program that emphasizes performance measurement and management and project technical peer review

  5. Environmental Audit, Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    1991-06-01

    This report documents the results of the Environmental Baseline Audit of DOE's Weldon Spring Site Remedial Action Project (WSSRAP), located in St. Charles, Missouri. The purpose of the Environmental Baseline Audit is to provide the Secretary of Energy with concise information pertaining to the following issues: (1) compliance status with applicable environmental regulations (with the exception of National Environmental Policy Act [NEPA] requirements); (2) adherence to best management and accepted industry practices; (3) DOE vulnerabilities and liabilities associated with compliance status, environmental conditions, and management practices; (4) root causes of compliance findings (CF) and best management practice (BMP) findings; (5) adequacy of environmental management programs and organizations; and (6) noteworthy practices. This information will assist DOE in determining patterns and trends in environmental compliance, BMPs, and root causes, and will provide the information necessary for line management to take appropriate corrective actions. 6 figs., 11 tabs

  6. Yakima Fisheries Project. Final environmental impact statement

    International Nuclear Information System (INIS)

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council's (Council's) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA's proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities (open-quotes adaptive managementclose quotes); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery

  7. Yakima Fisheries Project : Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  8. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    Science.gov (United States)

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  9. Hellsgate Winter Range: Wildlife Mitigation Project. Final Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    BPA proposes to fund the Hellsgate Winter Range: Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The Project is intended to mitigate for wildlife and wildlife habitat adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs. The Project would allow the sponsors to secure land and conduct wildlife habitat improvement and long-term management activities within the boundaries of the Colville Indian Reservation. BPA has prepared an Environmental Assessment (EA) (DOE/EA-0940) evaluating the potential environmental effects of the proposed Project (Alternative B) and No Action (Alternative A). Protection and re-establishment of riparian and upland habitat on the Colville Indian Reservation, under Alternative B, would not have a significant adverse environmental impact because: (1) there would be only limited, mostly short-term adverse impacts on soils, water quality, air quality, vegetation, and wildlife (including no effect on endangered species); and (2) there would be no adverse effect on water quantity, cultural resources, or land use. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI

  10. Near-Facility Environmental Monitoring Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    2000-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards

  11. A model of the environmental impacts of hydropower projects

    International Nuclear Information System (INIS)

    Kemppainen, T.; Haemaelaeinen, I.

    1992-01-01

    The aim was to create a model of the effects of hydropower modernization and extension projects in Finland. To illustrate the effects of hydropower projects a checklist in the form of matrice was constructed. In this matrice all issues that could be significant in future hydropower projects were collected. Stable physical environmental changes are the starting-point for this matrice. The temporary change of hydropower constructions have also been under consideration. These are mainly environmental changes during construction. In chapter two the effects of hydropower modernization and extension projects physical environmental changes were examined. In chapter three the matrice was applied to some example cases. The cases were chosen to represent future hydropower projects. In addition these example cases represent urban areas, rural areas and uninhabited areas. The example cases were the extension of Tainionkoski hydropower plant at Vuoksi river, the modernization of Aeetsae power plant at Kokemaeenjoki river, the modernization of Stadsfors power plant at Lapuanjoki river in the centre of Uusikaarlepyy town and the construction of Kaitfors power plant at Perhonjoki river. Conclusions from usability of the model can be drawn on the ground of the example cases. The purpose of the model is to produce a checklist of estimated environmental effects in hydropower project of various kinds. Examination of issues within the model depends on local circumstances. Endangered animal and plant species, for example, can be studied and estimated only if endangered animal and plant species exist in the area of hydropower plant. Furthermore, the direction and extent of environmental effects depend on the local circumstances. The model is mainly a checklist of environmental effects caused by hydropower plant projects

  12. Environmentally compliant manufacturing. Project accomplishment summary

    International Nuclear Information System (INIS)

    Morris, T.O.

    1997-01-01

    The metal working industry needs to reduce the waste associated with scrap, worn tools, degradation of metal working fluids, and etc. One task in this project concerned metal working fluids (MWF), which typically consists of surfactants, anti-microbial agents, lubricating agents, complexing agents, and a number of other components. The waste stream volume from the MWF can be reduced by judiciously (1) recycling, (2) selective replacement of expended components, and (3) protecting against microbial contamination. This activity consists of developing an analytical method, amenable to automation, which addresses all three of the methods of extending the MWF lifetime, thereby reducing the waste stream. The technology for determining key components in MWF on-line (at the machine tool) did not exist. The Y-12 Plant's collaboration was selected for this particular endeavor because of its ongoing machining operations and expertise in automation. In addition, concerns have been raised regarding chronic exposure of machine shop personnel to metal working fluid mists generated during routine machining operations. The chemical composition of metal working fluids is fairly well known, however, the chemical and physical characteristics of the resulting aerosols (mists) are not as well known. Machinists exposed to these aerosols by inhalation and skin contact sometimes develop unpleasant reactions. The second task involved efforts to characterize mists generated from candidate cutting fluids

  13. Sweetwater Uranium Project. Draft environmental statement

    International Nuclear Information System (INIS)

    1977-12-01

    The proposed action is the issuance of a Source Material License to Minerals Exploration Company for the construction and operation of the proposed Sweetwater Uranium Mill with a nominal capacity of 3000 tons (2.7 x 10 6 kg) per day of uranium ore in Wyoming. The applicant proposes also to construct a heap-leaching and resin ion-exchange facility to extract uranium from low-grade ores and mine water. Impacts to the area due to the operation of the Sweetwater Uranium Mine/Mill Project will result in: Alternations of up to 2200 acres by the mill, mine pit area, and roads, and about 3450 acres of Battle Spring Flat to be inundated by mine dewatering operations; increase in the existing background radiation levels; socioeconomic effects on Rawlins and other nearby areas; and tailings from the mill will be produced at a rate of about 3000 tons (2.7 x 10 6 kg) per day and will be stored onsite in a lined impoundment. Conditions for the issuance of the license are given

  14. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  15. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    International Nuclear Information System (INIS)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.' different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  16. A Reference Section through the Lower Fast-spreading Oceanic Crust in the Wadi Gideah (Sumail ophiolite, Sultanate Oman): Drill Sites GT1A and GT2A within the ICDP Oman Drilling Project

    Science.gov (United States)

    Mueller, S.; Koepke, J.; Garbe-Schoenberg, C. D.; Müller, T.; Mock, D.; Strauss, H.; Schuth, S.; Ildefonse, B.

    2017-12-01

    In the absence of a complete profile through fast-spreading oceanic crust in modern oceans, we established a reference profile through the whole paleocrust of the Sumail Ophiolite (Oman), which is regarded as the best analogue for fast-spreading oceanic crust on land. For establishing a coherent data set, we sampled the Wadi Gideah in the Wadi-Tayin massif from the mantle section up to the pillow basalts and performed different analytical and structural investigations on the same suite of samples (pool sample concept). The whole sample set contains about 400 samples focusing on both primary magmatic rocks and hydrothermal fault zones to characterize initial formation processes and cooling of the crust. The Wadi Gideah hosts the sites GT1A (lower crust) and GT2A (foliated / layered gabbro transition) where 400 m long cores have been drilled in the frame of the ICDP Oman Drilling Project (OmanDP). Thus, the Wadi Gideah crustal transect is well-suited for providing a reference frame for these two drill cores. Major and trace element data on minerals and rocks reveal in-situ crystallization in the deep crust, thus strongly supporting a hybrid accretion model that is characterized by sheeted sill intrusion in the lower part of the plutonic crust and gabbro glacier features in the upper section. This hybrid model is also supported by results on crystallographic preferred orientations (CPO) of the minerals within the gabbros, which call for distinct formation mechanisms in the upper and lower gabbro sections. A requirement for our hybrid model is significant hydrothermal cooling in the lower crust for the consumption of the latent heat of crystallization. This was facilitated by channelled hydrothermal flow zones, preserved today in faulted zones of extensively altered gabbro cutting both layered and foliated gabbros. These gabbros show higher Sr87/Sr86 ratios if compared to the background gabbro, the presence of late stage minerals (amphibole, oxides, orthopyroxene

  17. Geochemical and Mineralogical Profiles Across the Listvenite- Metamorphic Transition in the Basal Megathrust of the Oman Ophiolite: First Results from Drilling at Oman Drilling Project Hole BT1B

    Science.gov (United States)

    Godard, M.; Bennett, E.; Carter, E.; Kourim, F.; Lafay, R.; Noël, J.; Kelemen, P. B.; Michibayashi, K.; Harris, M.

    2017-12-01

    The transition from the base of the Oman ophiolite to the underlying metamorphic sole was drilled at Hole BT1B (Sumail Massif) during Phase 1 of Oman Drilling Project (Winter 2016-2017). 74 samples were collected from the 300m of recovered cores for whole rock geochemical and XRD analyses. 55 listvenites, ophicarbonates and serpentinites, and 19 schists and greenstones were analyzed for major and minor elements (XRF) and for CO2 and S concentrations (CHNS) aboard DV Chikyu (ChikyuOman, Summer 2017). Analyses for trace elements (ICP-MS) at the University of Montpellier are in progress. The composition of listvenites, ophicalcites and serpentinites recovered at Hole BT1B record extensive interactions between CO2-rich fluids and the serpentinized peridotites. These reactions involved addition of SiO2 and formation of carbonates at the expense of the serpentinized peridotite protolith. All samples recovered from the mantle section are enriched in fluid mobile and incompatible trace elements compared to the mean composition of the Oman mantle. These enrichments are up to 103 times the Oman mantle for Rb and Ba. They mimic the pattern of the samples from the metamorphic sole. This suggests that the composition of the listvenites in these elements is controlled by that of contaminating fluids that may have originated in the same lithologies as those drilled at the base of Hole BT1B. Listvenites, ophicalcites and serpentinites also show notable downhole chemical variations, with listvenites showing marked variations in Al2O3 and TiO2. Occurrence of lherzolites and cpx-harzburgites has been reported at the base of the Oman dominantly harzburgitic mantle section. The observed variations in the listvenites (Al2O3 and TiO2) could be related to the composition of their protolith, the deepest having more fertile compositions. Alternatively, the observed downhole changes in the composition of listvenites may relate to the progressive equilibration of the reacting ultramafic

  18. An investigation of an evaluation of the environmental conditions in analyses of a guide pipe and moorings of a drilling ship when drilling at great sea depths, Part two

    Energy Technology Data Exchange (ETDEWEB)

    Hiroichi, H; Susumu, K; Tetsuo, M; Yasuhiko, M

    1983-01-01

    The application of the results of analysis of the behavior of an offshore guide pipe and a system of mooring for evaluating the critical environmental conditions in the real plane of drilling offshore wells in great water depths in the region of Miyakodzima oki and Omadedzaki oki is examined. The following criteria were used in designing the moorings and the offshore guide pipe for Miyakodzima-oki: the maximal linear stretching stress of the moorings must be less than or equal to one third the rupture strength, the maximal angle of phiim, the angle between the vertical line and the lower part of this pipe, equal to 4 degrees and the maximal stress in the guide pipe of less than 40 percent of the fluidity limit, in storm conditions these indicators must be one third the rupture strength, 10 degrees and 60 percent of the fluidity limit, respectively. Data are cited from an analysis of the guide pipe, the stress of the moorings and the equipment. The results of static and dynamic analyses of an offshore guide pipe in the conditions of the Miyakodzima oki sea are compared. It is shown that with drilling in waves with a height of 5.7 meters and a period of 8.7 seconds and a current rate of 1.5 to 2.6 meters per second the horizontal shift of the drilling ship relative to the preventers (Sbs) is 4 percent, the stretching tension of the guide pipe based on the static analysis is 93 megapascals and based on dynamic analysis (hereinafter indicated in parentheses) (93 megapascals), phiim of 3.44 degrees (3.7 degrees) and in storm conditions at a wave height of 1.42 and period of 13.8 seconds the stress of the guide pipe reaches 148 megapascals (150 megapascals) and phiim is 7.73 degrees (8.4 degrees). These data attest to the fact that the static and dynamic analysis produce approximately identical results.

  19. Olympic Dam project: assessment of the environmental impact

    International Nuclear Information System (INIS)

    1983-11-01

    The assessment report on the Environmental Impact Statement produced for the Olympic Dam project is intended to provide the South Australian Government with a comprehensive evaluation of the potential impact of the proposal and to make recommendations concerning the project to be negotiated with the Joint Venturers prior to approval of the EIS. The project involves the mining, processing and sale of products from the copper-uranium ore body at Olympic Dam on the Roxby Downs Station, South Australia. The report includes a description of the proposal, a description of the environment likely to be affected, a discussion of the potential impacts on that environment, a discussion of the adequacy of information presented in the EIS and a discussion of the acceptability of the environmental impacts. The Department has concluded that the pre-design proposal is acceptable on environmental grounds

  20. Management of environmental and radiation data - the Olympic Dam project

    International Nuclear Information System (INIS)

    Jenkins, B.

    1987-01-01

    In terms of data management the Olympic Dam Project is in a process of transition from investigative studies to operational monitoring. The data management requirements for investigative studies are quite different requirements and indicates the progress taken in this transition, as well as the directions being taken to complete this transition. The environmental and radiation management programs for the Olympic Dam Project have already stored 70 megabytes of data on computer. With the comprehensive monitoring requirements which have been, or are in the process of being established for production operations, the volume of data is increasing. There are six main areas involving environmental and radiation data management: project area environmental monitoring; monitoring of the impact pathway from groundwater extraction for water supply to possible effects on mound springs; radiation levels in the environment; radiation exposures to designated employees; other occupational exposures in the mine; medical records relevant to occupational health

  1. Proposed OPEG Namakan River hydro development project draft environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Ojibway Power and Energy Group (OPEG) is planning on installing a hydroelectric generating facility along the Namakan River at High Falls in Canada. In order the meet the different requirements in terms of environmental assessment for such a project, the group prepared an environmental report. The aim of this paper is to present the comments of the Quetico Foundation, a charity whose aim is to protect wilderness class parks. The foundation found both general and discipline-by-discipline deficiencies in OPEG's environmental report. All the deficiencies the Foundation observed are listed in this report, general deficiencies, and specific deficiencies concerning fisheries, terrestrial ecology, hydrology and socio-economic impacts. The Quetico Foundation demonstrated that a significant number of deficiencies are found in the OPEG environmental report, suggesting that they did not fully understand the potential long term impacts of their project and that further study should be undertaken.

  2. Salt Lake City Area Integrated Projects: Rate adjustment: Environmental assessment

    International Nuclear Information System (INIS)

    1990-08-01

    The Department of Energy (DOE) has determined that the proposed firm power rate increase for the Salt Lake City Area Integrated Projects (Integrated Projects) power would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA, 42 USC 4321, et seq.) and, as such, does not require the preparation of an environmental impact statement (EIS). This determination is based on an environmental assessment (EA) prepared by the Western Area Power Administration (Western) dated August 1990 (DOE/EA-0457). The EA identifies and evaluates the potential environmental and socioeconomic effects of the proposed action, and based on the analysis contained therein, DOE concludes that the impacts to the human environment resulting from the implementation of the rate increase would be insignificant

  3. BPA/PGE transmission support project: Final environmental assessment

    International Nuclear Information System (INIS)

    1996-12-01

    This Mitigation Action Plan describes the mitigation measures identified in the BPA/PGE Transmission Support Project Environmental Assessment. These measures commit to actions that will reduce the environmental impacts that could occur by constructing, operating and maintaining the transmission line and related facilities. They have been developed in coordination with environmental specialists, design and construction engineers and maintenance personnel. The measures will be written into the construction specifications for the project, which is expected to be constructed by contract personnel. Unless noted in the plan, the construction inspector or the line foreman would be responsible for carrying out the mitigation; environmental staff would also monitor the area for mitigation effectiveness. The right-of-way would be cleared in 1997 or 1998, and construction would begin in the spring of 1998 and be completed later that fall

  4. Environmental studies and clearance compliance of Kudankulam Atomic Power Project

    International Nuclear Information System (INIS)

    Agarwal, S.K.; Singh, Jitendra

    2002-01-01

    Full text: Nuclear industry has played a leading role in evolving proper and effective environmental management impact from development practices right form inception thus minimizing the environmental impact from developmental activities of man. In the engineering design of nuclear power plant, safety is further enhanced considerably by providing double back-upped engineered safety systems. Besides the engineered safety, the other factors considered for ensuring environmental impact minimization are siting criteria, conservative rad-waste management, effluent treatment, application of stringent environmental protection standards for limiting waste discharges, an elaborate environmental surveillance program and an on site and off site emergency preparedness plan. Recently, nuclear power industry has taken a drive to develop and implement Environmental Management System (EMS) to all its operating stations in line with ISO-14001 standards. For Kudankulam atomic power project, a number of studies specifically for environmental protection are carried out to meet the requirements of Russian Federation, new guidelines of Ministry of environment and Forests (MOEF) and Atomic Energy Regulatory Board (AERB). In the present paper an attempt has been made to present the environmental management plan and clearance compliance status of the project

  5. Compositional variation within thick (>10 m) flow units of Mauna Kea Volcano cored by the Hawaii Scientific Drilling Project

    Science.gov (United States)

    Huang, Shichun; Vollinger, Michael J.; Frey, Frederick A.; Rhodes, J. Michael; Zhang, Qun

    2016-07-01

    Geochemical analyses of stratigraphic sequences of lava flows are necessary to understand how a volcano works. Typically one sample from each lava flow is collected and studied with the assumption that this sample is representative of the flow composition. This assumption may not be valid. The thickness of flows ranges from 100 m. Geochemical heterogeneity in thin flows may be created by interaction with the surficial environment whereas magmatic processes occurring during emplacement may create geochemical heterogeneities in thick flows. The Hawaii Scientific Drilling Project (HSDP) cored ∼3.3 km of basalt erupted at Mauna Kea Volcano. In order to determine geochemical heterogeneities in a flow, multiple samples from four thick (9.3-98.4 m) HSDP flow units were analyzed for major and trace elements. We found that major element abundances in three submarine flow units are controlled by the varying proportion of olivine, the primary phenocryst phase in these samples. Post-magmatic alteration of a subaerial flow led to loss of SiO2, CaO, Na2O, K2O and P2O5, and as a consequence, contents of immobile elements, such as Fe2O3 and Al2O3, increase. The mobility of SiO2 is important because Mauma Kea shield lavas divide into two groups that differ in SiO2 content. Post-magmatic mobility of SiO2 adds complexity to determining if these groups reflect differences in source or process. The most mobile elements during post-magmatic subaerial and submarine alteration are K and Rb, and Ba, Sr and U were also mobile, but their abundances are not highly correlated with K and Rb. The Ba/Th ratio has been used to document an important role for a plagioclase-rich source component for basalt from the Galapagos, Iceland and Hawaii. Although Ba/Th is anomalously high in Hawaiian basalt, variation in Ba abundance within a single flow shows that it is not a reliable indicator of a deep source component. In contrast, ratios involving elements that are typically immobile, such as La/Nb, La

  6. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  7. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    International Nuclear Information System (INIS)

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE's deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program

  8. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE`s deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program.

  9. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  10. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    International Nuclear Information System (INIS)

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989

  11. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  12. Drilling rig

    Energy Technology Data Exchange (ETDEWEB)

    Galiopa, A A; Yegorov, E K

    1981-01-04

    A drilling rig is proposed which contains a tower, lifter in the form of n infinite chain, and mobile rotator with holding device connected to the chain, and pipe holder. In order to accelerate the auxiliary operations to move the drilling string and unloaded rotator, the rotator is equipped with a clamp with means for transverse connection of it to both branches of the chain, while the pipe holders equipped with a clamp with means of connecting it to one of the branches of the chain.

  13. Drilling mud

    Energy Technology Data Exchange (ETDEWEB)

    Rusayev, A A; Bibikov, K V; Simonenkov, I D; Surkova, K I

    1982-01-01

    Drilling mud is proposed which contains clay, water, water output reducer, pH regulator, viscosity reducer and hydrogen sulfide absorber. In order to improve the absorbing capacity of the drilling mud with pH 8-11 and simultaneously preservation of the technological properties of the mud, it contains as the absorber of hydrogen sulfide pyrite cinders with the following ratio of components, % by mass: clay 5.0-35.0; water output reducer 0.2-2.0; pH regulator 0.05-0.25; viscosity reducer 0.1-1.0; pyrite cinders 0.5-4.0; water--the rest.

  14. The Effect of Environmental Science Projects on Students' Environmental Knowledge and Science Attitudes

    Science.gov (United States)

    Al-Balushi, Sulaiman M.; Al-Aamri, Shamsa S.

    2014-01-01

    The current study explores the effectiveness of involving students in environmental science projects for their environmental knowledge and attitudes towards science. The study design is a quasi-experimental pre-post control group design. The sample was 62 11th-grade female students studying at a public school in Oman. The sample was divided into…

  15. Environmental impact assessment for the Nova projects (Building 391 complex)

    International Nuclear Information System (INIS)

    Odell, B.N.

    1979-01-01

    The environmental impact assessment of the Nova projects (Building 391 Complex) describes (1) the proposed actions, (2) the existing environment in and around the Livermore Valley, and (3) the potential environmental impacts from the construction and operation of these facilities. It shows that the proposed action does not conflict with any Federal, State, Regional, or Local Plans and Programs. Possible alternatives to the proposed action are discussed. However, it is concluded that the proposed actions were the most reasonable of the alternatives and would involve relatively minor adverse environmental impacts

  16. West Valley Demonstration Project site environmental report calendar year 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1998 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  17. West Valley Demonstration Project site environmental report, calendar year 1999

    Energy Technology Data Exchange (ETDEWEB)

    None Available

    2000-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1999 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  18. West Valley Demonstration Project site environmental report, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1997 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  19. Results of an adaptive environmental assessment modeling workshop concerning potential impacts of drilling muds and cuttings on the marine environment

    Science.gov (United States)

    Auble, Gregor T.; Andrews, Austin K.; Ellison, Richard A.; Hamilton, David B.; Johnson, Richard A.; Roelle, James E.; Marmorek, David R.

    1983-01-01

    Drilling fluids or "muds" are essential components of modern drilling operations. They provide integrity for the well bore, a medium for removal of formation cuttings, and lubrication and cooling of the drill bit and pipe. The modeling workshop described in this report was conducted September 14-18, 1981 in Gulf Breeze, Florida to consider potential impacts of discharged drilling muds and cuttings on the marine environment. The broad goals of the workshop were synthesis of information on fate and effects, identification of general relationships between drilling fluids and the marine environment, and identification of site-specific variables likely to determine impacts of drilling muds and cuttings in various marine sites. The workshop was structured around construction of a model simulating fate and effects of discharges from a single rig into open water areas of the Gulf of Mexico, and discussion of factors that might produce different fate and effects in enclosed areas such as bays and estuaries. The simulation model was composed of four connected submodels. A Discharge/Fate submodel dealt with the discharge characteristics of the rig and the subsequent fate of discharged material. Three effects submodels then calculated biological responses at distances away from the rig for the water column, soft bottom benthos (assuming the rig was located over a soft bottom environment), and hard bottom benthos (assuming the rig was located over a hard bottom environment). The model focused on direct linkages between the discharge and various organisms rather than on how the marine ecosystem itself is interconnected. Behavior of the simulation model indicated relatively localized effects of drilling muds and cuttings discharged from a single platform into open water areas. Water column fate and effects were dominated by rapid dilution. Effects from deposition of spent mud and cuttings were spatially limited with relatively rapid recovery, especially in soft bottom benthic

  20. The DSeis Project: Drilling into Seismogenic zones of M2.0 to M5.5 earthquakes in South African gold mines

    Science.gov (United States)

    Yabe, Y.; Ogasawara, H.; Ito, T.; van Aswegen, G.; Durrheim, R. J.; Cichowicz, A.; Onstott, T. C.; Kieft, T. L.; Boettcher, M. S.; Wiemer, S.; Ziegler, M.; Shapiro, S. A.; Gupta, H. K.; Dight, P.

    2017-12-01

    The DSeis project under ICDP consists of drilling in three mines; MK, TT and C4 mines. Common scientific targets among them are the stress state and the microstructure in the seismogenic zone. In addition to these targets, specific targets in individual mines are detailed below. A M5.5 earthquake occurred beneath the MK mine on 5 August 2014. The hypocenter of this event was 5km depth from the surface. In contrast to the normal faulting of induced earthquakes in mining horizons (planned to evaluate how much is a ratio of microseismicity associated with creation of new fractures. In the C4 mine, there was the site of a previous project, in which the microseismicity monitoring and the stress measurement by the CCBO technique were carried out. A M2.8 earthquake occurred 1 year after the CCBO and its hypocenter was only 100m away from the CCBO site. Due to little mining activity in the source region, the stress state just after the M2.8 event should be preserved. We will measure the stress again. Damage zones that evolved quasi-statically were seen by the microseismicity monitoring. Drilling into these zones would provide a clue to see a difference between faults evolved dynamically and quasi-statically.

  1. Environmental impact assessment of Kachchh tidal power project

    International Nuclear Information System (INIS)

    Yadav, Ramanand; Lal, B.B.

    1995-01-01

    The Kachchh tidal power development project is a single-basin, single -effect and ebb generation development by construction of a tidal power barrage of about 3.25 km length across Hansthal creek. The project may disturb the ecosystem of the region. The paper deals in detail the environmental impacts of the project on climate, water velocity, flow and sedimentation pattern, water quality, flora and fauna, fishery, tourism and recreation, wild life, public health and socio-economic conditions. (author). 4 refs., 1 fig., 2 tabs

  2. Wuskwatim generation project : Canadian Environmental Assessment Act comprehensive study report

    International Nuclear Information System (INIS)

    2005-10-01

    This study report described the plan by Manitoba Hydro and the Nisichawayasihk Cree Nation (NCN) to construct a new 200- megawatt (MW) generating station at Taskinigup Falls on the Burntwood River, near the outlet of Wuskwatim Lake. This hydroelectric power project will allow Manitoba Hydro to meet its projected energy needs within the next two decades as identified in its 2002/03 Power Resource Plan. It will also allow Manitoba Hydro and NCN to obtain additional export revenues and profits by advancing the in-service date of the Project from 2020 to 2009. A formal environmental assessment is required under the Canadian Environmental Assessment Act (CEAA) because Fisheries and Oceans Canada (DFO) has determined that the Project would cause fish habitat losses requiring an authorization under the Fisheries Act. Many of the structures to be built in navigable waters would also require formal approval under the Navigable Waters Protection Act (NWPA), which has prompted this application of the CEAA. This environmental assessment report has been prepared by DFO in consultation with Transport Canada and other federal authorities concerned. It provides a summary of the Wuskwatim Generation Project and the environment in which it will be built and operated. In addition, the results of public consultations are discussed. It presents an assessment of the Project's influence on fish and fish habitat, birds, species at risk, human health (local air quality, quality of drinking water and consumption of fishery products), navigation, use of renewable resources, and current use of lands and resources for traditional purposes by Aboriginal persons (hunting, trapping, gathering, subsistence fishing and heritage sites). It was concluded that the proposed Project, as defined by the scope of the study, is not likely to cause significant adverse environmental effects. 45 refs., 5 tabs., 13 figs., 3 appendices

  3. Environmental cost of using poor decision metrics to prioritize environmental projects.

    Science.gov (United States)

    Pannell, David J; Gibson, Fiona L

    2016-04-01

    Conservation decision makers commonly use project-scoring metrics that are inconsistent with theory on optimal ranking of projects. As a result, there may often be a loss of environmental benefits. We estimated the magnitudes of these losses for various metrics that deviate from theory in ways that are common in practice. These metrics included cases where relevant variables were omitted from the benefits metric, project costs were omitted, and benefits were calculated using a faulty functional form. We estimated distributions of parameters from 129 environmental projects from Australia, New Zealand, and Italy for which detailed analyses had been completed previously. The cost of using poor prioritization metrics (in terms of lost environmental values) was often high--up to 80% in the scenarios we examined. The cost in percentage terms was greater when the budget was smaller. The most costly errors were omitting information about environmental values (up to 31% loss of environmental values), omitting project costs (up to 35% loss), omitting the effectiveness of management actions (up to 9% loss), and using a weighted-additive decision metric for variables that should be multiplied (up to 23% loss). The latter 3 are errors that occur commonly in real-world decision metrics, in combination often reducing potential benefits from conservation investments by 30-50%. Uncertainty about parameter values also reduced the benefits from investments in conservation projects but often not by as much as faulty prioritization metrics. © 2016 Society for Conservation Biology.

  4. Environmental Assessment Expanded Ponnequin Wind Energy Project Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-03-02

    The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCO) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. DOE completed an environmental assessment of the original proposed project in August 1997. Since then, the geographic scope and the design of the project changed, necessitating additional review of the project under the National Environmental Policy Act. The project now calls for the possible construction of up to 48 wind turbines on State and private lands. PSCo and its partners have initiated construction of the project on private land in Weld County, Colorado. A substation, access road and some wind turbines have been installed. However, to date, DOE has not provided any funding for these activities. DOE, through its Commercialization Ventures Program, has solicited applications for financial assistance from state energy offices, in a teaming arrangement with private-sector organizations, for projects that will accelerate the commercialization of emerging renewable energy technologies. The Commercialization Ventures Program was established by the Renewable Energy and Energy Efficiency Technology Competitiveness Act of 1989 (P.L. 101-218) as amended by the Energy Policy Act of 1992 (P.L. 102-486). The Program seeks to assist entry into the marketplace of newly emerging renewable energy technologies, or of innovative applications of existing technologies. In short, an emerging renewable energy technology is one which has already proven viable but which has had little or no operational experience. The Program is managed by the Department of Energy, Office of Energy Efficiency and Renewable Energy. The

  5. A new drilling method-Earthworm-like vibration drilling.

    Science.gov (United States)

    Wang, Peng; Ni, Hongjian; Wang, Ruihe

    2018-01-01

    The load transfer difficulty caused by borehole wall friction severely limits the penetration rate and extended-reach limit of complex structural wells. A new friction reduction technology termed "earthworm-like drilling" is proposed in this paper to improve the load transfer of complex structural wells. A mathematical model based on a "soft-string" model is developed and solved. The results show that earthworm-like drilling is more effective than single-point vibration drilling. The amplitude and frequency of the pulse pressure and the installation position of the shakers have a substantial impact on friction reduction and load transfer. An optimization model based on the projection gradient method is developed and used to optimize the position of three shakers in a horizontal well. The results verify the feasibility and advantages of earthworm-like drilling, and establish a solid theoretical foundation for its application in oil field drilling.

  6. Environmental education project 'Mico-Estrela Track'

    Energy Technology Data Exchange (ETDEWEB)

    Vicente, Ana Paula Camargo de; Magalhaes, Milton Pinto Magalhaes; Silva, Simone Rodrigues da; Pinheiro, Roberta Vieira Nunes; Torres, Carlos Alberto Rodrigues; Silveira, Jeanete [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-12-19

    Senador Canedo fuel storage terminal is situated in the Cerrado biome and implements the policy of promoting improvements in the preservation of its Green Belt by working out the Environmental Education Project 'Mico-Estrela7 Track', aimed at stimulating the preservation, protection, landscape beauty and defense of scientific sources of the Cerrado through environmental sensibilization and rational use of the existing natural resources. In the area of the track (1.5 ha) alone 352 plants have been identified, totaling 97 different species that are distributed in 36 families. The implementation of the project will contribute to strengthen the relations with the local community, like dwellers, teachers and pupils of the municipal network of Senador Canedo, as well as co-workers of the unit, thus reaffirming the commitment of the company to socio-environmental responsibility. (author)

  7. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  8. Environmental assessment for the National Conversion Pilot Project, Stage 3

    International Nuclear Information System (INIS)

    1997-01-01

    The purpose of the National Conversion Pilot Project (NCPP) is to explore and demonstrate, at the Rocky Flats Environmental Technology Site (RFETS), the feasibility of economic conversion at Department of Energy facilities. Economic conversion is the conversion of facilities and equipment owned by the Federal government to production of goods by private firms for profit. The NCPP mission is consistent with the RFETS current mission: to conduct site remediation, decontaminate and decommission site buildings and close the site in a manner that is safe, environmentally and socially responsible, physically secure, and cost effective. The NCPP is divided into three stages, with decision points at the ends of Stages 1 and 2 and periodically during Stage 3, to help ensure careful consideration of project effectiveness and to create an opportunity for regulators and stakeholders to provide comments to the DOE. At the end of each stage, the project can be reversed, authorized to proceed, or terminated

  9. Environmental measures for Escuintla No. 3 unit thermal power project

    Energy Technology Data Exchange (ETDEWEB)

    Quisquinay, Carlos; Fabian Rosales, Alejandro [Instituto Nacional de Electrificacion, (Guatemala)

    1996-12-31

    The environmental measures in relation to the project implementation was studied with reference to the Japanese Standards and incorporated in the Implementation Program. This report is prepared however, to review the environmental measures for the project in more detail as to the allowable standards and regulations concerning the measures for the environmental pollution. The authors present the environmental conditions around the Escuintla Power Station in Guatemala; the measures for environmental pollution and evaluation; the measures for prevention of air pollution and diffusion calculations (estimation and assessment of environmental impacts) [Espanol] Las medidas ambientales con relacion a la consolidacion del proyecto, se estudiaron con referencia a los Estandares Japoneses e incorporados en el Programa de Consolidacion. Sin embargo, este reporte ha sido preparado para revisar las medidas ambientales para el proyecto mas detalladamente, con relacion a los estandares y reglamentaciones admisibles concernientes a las medidas de contaminacion ambiental. Los autores presentan las condiciones ambientales en los alrededores de la Central Termoelectrica de Escuintla de Guatemala; las medidas para la prevencion de la contaminacion del aire y los calculos de difusion (estimacion y evaluacion del impacto ambiental)

  10. Environmental measures for Escuintla No. 3 unit thermal power project

    Energy Technology Data Exchange (ETDEWEB)

    Quisquinay, Carlos; Fabian Rosales, Alejandro [Instituto Nacional de Electrificacion, (Guatemala)

    1997-12-31

    The environmental measures in relation to the project implementation was studied with reference to the Japanese Standards and incorporated in the Implementation Program. This report is prepared however, to review the environmental measures for the project in more detail as to the allowable standards and regulations concerning the measures for the environmental pollution. The authors present the environmental conditions around the Escuintla Power Station in Guatemala; the measures for environmental pollution and evaluation; the measures for prevention of air pollution and diffusion calculations (estimation and assessment of environmental impacts) [Espanol] Las medidas ambientales con relacion a la consolidacion del proyecto, se estudiaron con referencia a los Estandares Japoneses e incorporados en el Programa de Consolidacion. Sin embargo, este reporte ha sido preparado para revisar las medidas ambientales para el proyecto mas detalladamente, con relacion a los estandares y reglamentaciones admisibles concernientes a las medidas de contaminacion ambiental. Los autores presentan las condiciones ambientales en los alrededores de la Central Termoelectrica de Escuintla de Guatemala; las medidas para la prevencion de la contaminacion del aire y los calculos de difusion (estimacion y evaluacion del impacto ambiental)

  11. Management of the Atmosphere Resource Recovery and Environmental Monitoring Project

    Science.gov (United States)

    Roman, Monsi; Perry, Jay; Howard, David

    2013-01-01

    The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.

  12. Status report : Terra Nova project environmental assessment panel : recommendations

    International Nuclear Information System (INIS)

    2002-01-01

    An application to the Canada-Newfoundland Offshore Petroleum Board (CNOPB) was submitted by Petro-Canada on August 5, 1996, notifying of its intent to develop the petroleum resources located at the Terra Nova field. The provincial and federal governments jointly appointed the Terra Nova Project Environmental Panel, and the board of the CNOPB referred to it the application documents for review. The environmental effects, considerations of human safety incorporated into the design and operation of the Project, the general approach to the development and exploitation of the petroleum resources, and the employment and industrial benefits expected to be derived from the Project were the issues under review by the Panel. On April 22, 1997, public hearings into the review began, and the final report was submitted to governments and the Board in August 1997. The report included 75 recommendations. The Project was approved in Decision 97.02 in December 1997, and the Board dealt with each of the recommendations. The respective positions of the Governments of Canada and Newfoundland and Labrador with regard to the recommendations that fell outside the jurisdiction of the Board were made public. A status report on every one of the 75 recommendations is provided in the present report. The recommendation is repeated, the verbatim response taken from Decision 97.02 included, followed by the status of the response. The production operations phase of the Project accounts for approximately 65 per cent of the recommendations. January 20, 2002 was the date the Project was begun

  13. INEL Waste and Environmental Information Integration Project approach and concepts

    International Nuclear Information System (INIS)

    Dean, L.A.; Fairbourn, P.J.; Randall, V.C.; Riedesel, A.M.

    1994-06-01

    The Idaho National Engineering, Laboratory (INEL) Waste and Environmental Information integration Project (IWEIIP) was established in December 1993 to address issues related to INEL waste and environmental information including: Data quality; Data redundancy; Data accessibility; Data integration. This effort includes existing information, new development, and acquisition activities. Existing information may not be a database record; it may be an entire document (electronic, scanned, or hard-copy), a video clip, or a file cabinet of information. The IWEIIP will implement an effective integrated information framework to manage INEL waste and environmental information as an asset. This will improve data quality, resolve data redundancy, and increase data accessibility; therefore, providing more effective utilization of the dollars spent on waste and environmental information

  14. Impacts on seafloor geology of drilling disturbance in shallow waters.

    Science.gov (United States)

    Corrêa, Iran C S; Toldo, Elírio E; Toledo, Felipe A L

    2010-08-01

    This paper describes the effects of drilling disturbance on the seafloor of the upper continental slope of the Campos Basin, Brazil, as a result of the project Environmental Monitoring of Offshore Drilling for Petroleum Exploration--MAPEM. Field sampling was carried out surrounding wells, operated by the company PETROBRAS, to compare sediment properties of the seafloor, including grain-size distribution, total organic carbon, and clay mineral composition, prior to drilling with samples obtained 3 and 22 months after drilling. The sampling grid used had 74 stations, 68 of which were located along 7 radials from the well up to a distance of 500 m. The other 6 stations were used as reference, and were located 2,500 m from the well. The results show no significant sedimentological variation in the area affected by drilling activity. The observed sedimentological changes include a fining of grain size, increase in total organic carbon, an increase in gibbsite, illite, and smectite, and a decrease in kaolinite after drilling took place.

  15. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  16. Drilling mud

    Energy Technology Data Exchange (ETDEWEB)

    Babets, M A; Nechayev, N D; Vinogradova, G P

    1982-01-01

    A drilling mud is proposed which contains clay, alkali, water and stabilizer reagent. It is distinguished by the fact that in order to improve the viscosity and static shear stress, the stabilizer reagent contained is composted solid general wastes with the following ratio of components (% by weight): clay 10-15, alkali 0.1-0.2; composted solid general wastes 2-5; water--the rest.

  17. Drilling Specifications: Well Installations in the 300 Area to Support PNNL's Integrated Field-Scale Subsurface Research Challenge (IFC) Project

    International Nuclear Information System (INIS)

    Bjornstad, Bruce N.; Vermeul, Vince R.

    2008-01-01

    Part of the 300 Area Integrated Field-Scale Subsurface Research Challenge (IFC) will be installation of a network of high density borings and wells to monitor migration of fluids and contaminants (uranium), both in groundwater and vadose zone, away from an surface infiltration plot (Figure A-1). The infiltration plot will be located over an area of suspected contamination at the former 300 Area South Process Pond (SPP). The SPP is located in the southeastern portion of the Hanford Site, within the 300-FF-5 Operable Unit. Pacific Northwest National Laboratory (PNNL) with the support of FH shall stake the well locations prior to the start of drilling. Final locations will be based on accessibility and will avoid any surface or underground structures or hazards as well as surface contamination

  18. Bucket drill

    Energy Technology Data Exchange (ETDEWEB)

    Bezverkhiy, V.M.; Nabokov, I.M.; Podoksik, D.Z.; Sadovskiy, S.S.; Shanyukevich, V.A.

    1983-01-01

    The bucket drill including a cylindrical housing with bottom, ground intake windows and cutting knives is hinged to the housing, the mechanism of rotation of the cutting knives including rods connected by the cutter knives, and drive shaft is distinguished by the fact that in order to improve the effectiveness of drilling by automatic change in the angle of cutting depending on the strength of the drillable rock, the drill is equipped with elastic elements and cap with annular slits in which there are elastic elements. The mechanism of rotation of the cutting knives is equipped with levers hinged to the housing, pins with shaft and rocker arm. The rods are made with a slit and from one end are rigidly connected to the cutting knives, and from the other end to the levers by means of pins which are arranged in slits of the rod with the possibility of movement. The upper ends of the levers are installed with the possibility of movement in the pins whose shafts are arranged with the possibility of rotation in the rocker arm rigidly connected to the drive shaft. The drive shaft is equipped with cantilevers installed in the cap with the possibility of rotation and interaction with the elastic elements.

  19. Environmental education essentials for project designers in Angola

    Directory of Open Access Journals (Sweden)

    Mbongo Mpaxi

    2015-05-01

    Full Text Available The article provides a selection of essential contents supporting environmental education of project designers in Angola. To attain such objective knowledge; abilities and values to be pursued are listed. The selection was completed by means of a thorough inquire based on the application of analysis and synthesis, historical, logical, inductive, deductive and system methods. The need of Angolan builders of knowing the environmental mpact of constructions is backed up. At the same time, the professional abilities allowing the future graduates to contribute o the preservation of environment during the stages of design, construction, exploitation and demolition of buildings is described.

  20. Cincinnati, Ohio: Two environmental projects in danger of being misunderstood

    International Nuclear Information System (INIS)

    DeJong, K.A.

    1992-01-01

    The Mill Creek Flood Control and the Fernald Decontamination projects are major environmental issues in the (sub)urban setting of Cincinnati. Flood control of the Mill Creek, a tributary of the Ohio River that bisects Cincinnati, was initiated after a flood with $3 million damage in 1959. Its costs were originally estimated at $42 million (1970) and later at $106 million (1976); $110 million has now been spent and the total cost may reach $313 million in the year 2000 (1992 dollars). Benefit/cost ratios ranging between 2.6:1 and 1.6:1 were used to rationalize this project. Flood frequency of the Mill Creek will be discussed. Decontamination of the suburban Fernald site follows manufacturing of nuclear materials from 1953 until 1989. 149 tons of uranium and thorium wastes were released in the air, 83.5 tons to the Greater Miami River and 5,975 tons were placed in pits, all of which are leaking. The cost to cleanup up the local contamination may exceed $10 billion over a time period of 20--30 years, and the calculation of benefit/cost ratios is complex. The hydrology of the Fernald site will be examined. These two environmental projects are run respectively by the Army Corps of Engineers and the US Department of Energy through large industrial contractors. The projects are in danger of becoming like projects of the ''Military-Industrial Complex'' because of the public's ignorance or misinterpretation of the facts; the argument of public safety, and the huge costs. The role of geologists should include edification of the public about the geological aspects of environmental projects

  1. Drilling Automation Tests At A Lunar/Mars Analog Site

    Science.gov (United States)

    Glass, B.; Cannon, H.; Hanagud, S.; Lee, P.; Paulsen, G.

    2006-01-01

    Future in-situ lunar/martian resource utilization and characterization, as well as the scientific search for life on Mars, will require access to the subsurface and hence drilling. Drilling on Earth is hard - an art form more than an engineering discipline. The limited mass, energy and manpower in planetary drilling situations makes application of terrestrial drilling techniques problematic. The Drilling Automation for Mars Exploration (DAME) project is developing drilling automation and robotics for projected use in missions to the Moon and Mars in the 2011-15 period. This has been tested recently, drilling in permafrost at a lunar/martian analog site (Haughton Crater, Devon Island, Canada).

  2. Decision management for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Roberds, W.J.; Haerer, H.A. [Golder Associates, Inc., Redmond, WA (United States); Winterfeldt, D.V. [Decision Insights, Laguna Beach, CA (United States)

    1992-04-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project is in the process of developing estimates for the radiation doses that individuals and population groups may have received as a result of past activities at the Hanford Reservation in Eastern Washington. A formal decision-aiding methodology has been developed to assist the HEDR Project in making significant and defensible decisions regarding how this study will be conducted. These decisions relate primarily to policy (e.g., the appropriate level of public participation in the study) and specific technical aspects (e.g., the appropriate domain and depth of the study), and may have significant consequences with respect to technical results, costs, and public acceptability.

  3. Decision management for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Roberds, W.J.; Haerer, H.A.; Winterfeldt, D.V.

    1992-04-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project is in the process of developing estimates for the radiation doses that individuals and population groups may have received as a result of past activities at the Hanford Reservation in Eastern Washington. A formal decision-aiding methodology has been developed to assist the HEDR Project in making significant and defensible decisions regarding how this study will be conducted. These decisions relate primarily to policy (e.g., the appropriate level of public participation in the study) and specific technical aspects (e.g., the appropriate domain and depth of the study), and may have significant consequences with respect to technical results, costs, and public acceptability

  4. Environmental agreements in Canada : Aboriginal participation, EIA follow-up and environmental management of major projects

    Energy Technology Data Exchange (ETDEWEB)

    O' Faircheallaigh, C. [Griffith Univ., Brisbane (Australia). Dept. of Politics and Public Policy

    2006-05-15

    Attempts are now being made to address the historic marginalization of indigenous peoples from the management of resource projects located on their ancestral lands through the use of environmental agreements. However, the rapid pace of resource development in certain regions of Canada has meant that there is an increased need to ensure effective follow-up procedures for Environmental Impact Assessment (EIA) processes in order to achieve meaningful Aboriginal participation in the management of large-scale resource projects. Lack of effective follow-up has made it difficult for the relevant agencies to manage risks and uncertainties. This book discussed the use of new policy environmental agreements between industry, government, and Aboriginal peoples. Case studies where environmental agreements were used in the Northwest Territories, Alberta, and Newfoundland were presented in order to demonstrate their efficacy. It was concluded that structures and processes must be designed to encourage Aboriginal participation in consultation processes. refs., tabs.

  5. Drilling mortar

    Energy Technology Data Exchange (ETDEWEB)

    Theodorescu, V; Ditulescu, E

    1979-01-30

    A method is proposed for producing stable drilling mortar from drilled rock which makes it possible to stabilize the walls of the borehole and to maintain producing horizons of oil and gas wells in an undisturbed state. The proposed drilling mortar includes 5-12 wt.-% dry modified calcium lignosulfonate in the form of a solution containing about 30% dry matter with the addition of 0.1 wt.-% anti-foaming agent consisting of C/sub 19/-C/sub 20/ alcohol dissolved in a light petroleum product; cream of milk with about 10 wt.-% Ca(OH)/sub 2/ in a quantity sufficient for reducing the pH value of the ions down to 10.5; sodium chloride in amounts from 5 mg to 100 ml (aqueous phase); ordinarily used agents for ensuring the necessary density, viscosity, and filterability. For example, the preparation of the drilling fluid begins with the processing under laboratory conditions of lignosulfonic pulp obtained in the production of yeast fodder with the following characteristics: specific density, 1.15 kgf/dm/sup 3/; water content, 67% (according to the Dean and Stark method); pH 4.0. In the vessel is placed 1000 cm/sup 3/ lignosulfonic pulp containing 33% dry matter, and the pulp is heated to 90-95/sup 0/C by means of a water bath. To the heated pulp 33 cm/sup 3/ formic acid at a 40-% concentration is added by mixing. The specific temperature of the pulp is maintained in the constant mixing process for two hours. Then the cream of milk containing 10 wt.-% Ca(OH)/sub 2/ is added to raise the pH to 10.5. The cooled product is calcium lignosulfonate. To produce a stable form of the drilling mortar, 750 g clay and 10 g trass gel are added to a vessel containing 1500 cm/sup 3/ fresh water by means of mixing. The resulting dispersed mass remains at rest for 12 hours for purposes of hydration. Then 2 g of an anti-foaming agent dissolved in 6 cm/sup 3/ benzene is introduced to 1000 cm/sup 3/ modified calcium lignosulfonate produced by the above method.

  6. Environmental Audit of the Grand Junction Projects Office

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs.

  7. Environmental Audit of the Grand Junction Projects Office

    International Nuclear Information System (INIS)

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs

  8. Environmental Impact Assessment of a Water Transfer Project

    Directory of Open Access Journals (Sweden)

    Pazoki

    2015-07-01

    Full Text Available Background Reliable water supplies for drinking and agriculture are some of the objectives for the sustainable development of every country. However, constructed facilities such as dams and irrigation networks and drainage can exert positive and negative effects directly or indirectly on the environment. The environmental impact assessment is a method for identifying the positive and negative effects caused by a plan and suggests performance management best practices aimed at lessening the negative impacts and augmenting the positive ones. Objectives The present study sought to evaluate the environmental impacts of the water transfer project of the Jooban Dam in two phases of preparation and operation. Materials and Methods A checklist containing the positive, negative, short-term, and long-term effects as well as the continuation and probable occurrence of these effects was used. Results The results showed that the negative environmental and social impacts of the project outweighed the positive impacts in terms of type, number, and intensity. Conclusions Unless there are well-thought out strategies for minimizing the undesirable impact on the environment, it is not advisable that such projects be permitted.

  9. Environmental management compliance reengineering project, FY 1997 report

    International Nuclear Information System (INIS)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL''s environment, safety, and health requirements and milestone commitments. Compliance reengineer''s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL

  10. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  11. Willow Creek Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-04-01

    Today's notice announces BPA's proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA's obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council's 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI

  12. Environmental impact management during construction of the limestone project

    International Nuclear Information System (INIS)

    Windsor, D.C.

    1988-01-01

    The Limestone Generating Station is being constructed on the Nelson River in Northern Manitoba, and will consist of a 10 unit powerhouse, 5 gate concrete spillway and earthfill dam spanning the 1.5 km width of the Nelson River. Environmental concerns associated with the project included insufficient pre- and post-construction monitoring documenting resources present or magnitude of impacts, impacts on brook trout and lake sturgeon resources, wildlife habitat loss due to construction activities, destruction or disturbance of historic or archaeological sites, degradation of nearby water courses and fish habitat by aggregate removal, in-migration of construction personnel, and various other socio-economic impacts. An overview is provided of monitoring activities and results in the above areas, which involved numerous consultants and government agencies. The project administration and workers did not find the environmental programs, including inspection and enforcement activities, to be onerous or an impediment to the project. On the contrary, the environmental requirements assisted in the general planning for certain activities, and in the general criteria for the conduct of the activities. The work permit process was particularly useful as it defined the requirements of both parties and provided the specific standards necessary determining the acceptability of the activities. 14 refs., 1 fig

  13. Environmental management compliance reengineering project, FY 1997 report

    Energy Technology Data Exchange (ETDEWEB)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL`s environment, safety, and health requirements and milestone commitments. Compliance reengineer`s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL.

  14. Environmental monitoring annual report for the Tumulus Disposal Demonstration Project

    International Nuclear Information System (INIS)

    Yager, R.E.; Craig, P.M.

    1989-01-01

    The Fiscal Year 1988 Annual Report is the third in a series of semi-annual Tumulus Development Disposal Project data summary reports. The reporting schedule has been modified to correspond to the fiscal years and the subcontractor contract periods. This data summary spans the time from start of operations in June 1987 through the end of September 1988. The environmental data collected include run-off water quality and quantity, groundwater quality and levels, soil sampling and hydrometeorological data. This data is being used and analyzed here to demonstrate the environmental performance objectives for the TDDP as part of the overall performance assessment for the TDDP. Approximately one year of pre-operational data were collected prior to operations beginning on April 11, 1988. Comparisons are made between pre- and post-operational data. No significant environmental impacts have been found since operations have begun. 10 refs., 21 figs., 22 tabs

  15. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    International Nuclear Information System (INIS)

    Cercy, M.; Fayfich, Ronald; Schneider, Steven P.

    2008-01-01

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects

  16. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  17. Hellsgate Winter Range: Wildlife mitigation project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs

  18. Communication tools for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Blazek, Mary Lou; Power, Max S.

    1992-01-01

    From 1944 to 1989, the U.S. Department of Energy produced plutonium at the Hanford Site in southeast Washington State. In the early days of operation, large amounts of radioactive materials were released to the environment. Documents about the releases were made public in 1986. The Hanford Environmental Dose Reconstruction Project began in 1987. The Project will determine how much radioactive material was released, how that material may have exposed people, and what radiation doses people may have received. The Project will be complete in 1995. The federal government pays for the work. The scientific work on the study is done by Battelle's Pacific Northwest Laboratory. Public credibility and valid science are equally important to those directing the dose reconstruction work. A number of tools are used to inform the public and encourage public participation. These tools are examined in this paper. (author)

  19. Deep drilling KLX 02. Drilling and documentation of a 1700 m deep borehole at Laxemar, Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, O [VBB VIAK AB, Malmoe (Sweden)

    1994-08-01

    In this report the preparation and execution of the deep core drilling KLX 02 is described. The hole was drilled with the wireline methods, NQ dimension (diameter 76 mm), to a final depth of 1700.5 m. Prior to core drilling a diameter 215 mm pilot hole was pre drilled to 200 m with controlled hammer drilling (DTH). In this hole casing and air-lift equipment was installed with the aim to support the circulation of drilling fluid. During core drilling there was a measurement of major drilling parameters and drilling fluid in and out of hole. As a fluid tracer uranine was used. Each 300 m of core drilling air-lift pump tests were performed. After completion a flow-meter log was run to finalize the project phase. It can be concluded that both the pre drilling and core drilling methods used proved to be successful. No severe technical problem occurred. However, potential risks have been pointed at in the report. The air-lift system functioned only partly and has to be modified for further use. Also the technique for monitoring of drilling parameters needs improvement as does the method for air-lift pump tests with packer. The organisation model for planning and realization functioned satisfactory and can be recommended for similar future projects. 9 refs, numerous tabs and figs.

  20. Deep drilling KLX 02. Drilling and documentation of a 1700 m deep borehole at Laxemar, Sweden

    International Nuclear Information System (INIS)

    Andersson, O.

    1994-08-01

    In this report the preparation and execution of the deep core drilling KLX 02 is described. The hole was drilled with the wireline methods, NQ dimension (diameter 76 mm), to a final depth of 1700.5 m. Prior to core drilling a diameter 215 mm pilot hole was pre drilled to 200 m with controlled hammer drilling (DTH). In this hole casing and air-lift equipment was installed with the aim to support the circulation of drilling fluid. During core drilling there was a measurement of major drilling parameters and drilling fluid in and out of hole. As a fluid tracer uranine was used. Each 300 m of core drilling air-lift pump tests were performed. After completion a flow-meter log was run to finalize the project phase. It can be concluded that both the pre drilling and core drilling methods used proved to be successful. No severe technical problem occurred. However, potential risks have been pointed at in the report. The air-lift system functioned only partly and has to be modified for further use. Also the technique for monitoring of drilling parameters needs improvement as does the method for air-lift pump tests with packer. The organisation model for planning and realization functioned satisfactory and can be recommended for similar future projects. 9 refs, numerous tabs and figs

  1. Drilling mud

    Energy Technology Data Exchange (ETDEWEB)

    Baranovskiy, V D; Brintsev, A I; Gusev, V G; Katenev, Ye P; Pokhorenko, I V

    1979-10-25

    A drilling mud is proposed, which contains a dispersion medium, a dispersion phase, for instance, clay, a stabilizer reagent, for instance, carboxymethylcellulose and a weighter. In order to reduce the viscosity and to increase the stability of the mud it contains as the dispersion medium a 75% aqueous solution of the L-7 reagent. To increase the salt resistance of the mud, it additionally contains sodium chloride in a volume of 4.04.5 percent by weight, and to regulate the alkalinity, it additionally contains sodium hydroxide in a volume of 1.1 to 1.3 percent by weight.

  2. Quaternary glaciation and hydrologic variation in the South American tropics as reconstructed from the Lake Titicaca drilling project

    Science.gov (United States)

    Fritz, Sherilyn C.; Baker, Paul A.; Seltzer, Geoffrey O.; Ballantyne, Ashley; Tapia, Pedro; Cheng, Hai; Edwards, R. Lawrence

    2007-11-01

    A 136-m-long drill core of sediments was recovered from tropical high-altitude Lake Titicaca, Bolivia-Peru, enabling a reconstruction of past climate that spans four cycles of regional glacial advance and retreat and that is estimated to extend continuously over the last 370,000 yr. Within the errors of the age model, the periods of regional glacial advance and retreat are concordant respectively with global glacial and interglacial stages. Periods of ice advance in the southern tropical Andes generally were periods of positive water balance, as evidenced by deeper and fresher conditions in Lake Titicaca. Conversely, reduced glaciation occurred during periods of negative water balance and shallow closed-basin conditions in the lake. The apparent coincidence of positive water balance of Lake Titicaca and glacial growth in the adjacent Andes with Northern Hemisphere ice sheet expansion implies that regional water balance and glacial mass balance are strongly influenced by global-scale temperature changes, as well as by precessional forcing of the South American summer monsoon.

  3. Tiering strategic environmental assessment and project environmental impact assessment in highway planning in Sao Paulo, Brazil

    International Nuclear Information System (INIS)

    Sanchez, Luis E.; Silva-Sanchez, Solange S.

    2008-01-01

    Constructing highways in dense urban areas is always a challenge. In Sao Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project, called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult. The agency in charge commissioned a strategic environmental assessment (SEA) of a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing. Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on 'what is strategic' is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval

  4. Draft Environmental Impact Statement: Proposed Tenaska, Washington II Generation Project

    International Nuclear Information System (INIS)

    1993-08-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Power Partners, Inc. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and evaluated in the Environmental Impact Statement (EIS) include: potential air quality impacts such as emissions and their contribution to the ''greenhouse'' effect; potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields, and potential water quality impacts such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is particularly controversial. The EIS is being mailed to numerous agencies, groups, and individuals. There will be a 45-day comment period, during which a Public Hearing will be held

  5. Environmental impacts of dispersed development from federal infrastructure projects.

    Science.gov (United States)

    Southerland, Mark T

    2004-06-01

    Dispersed development, also referred to as urban growth or sprawl, is a pattern of low-density development spread over previously rural landscapes. Such growth can result in adverse impacts to air quality, water quality, human health, aquatic and terrestrial ecosystems, agricultural land, military training areas, water supply and wastewater treatment, recreational resources, viewscapes, and cultural resources. The U.S. Environmental Protection Agency (U.S. EPA) is charged with protecting public health and the environment, which includes consideration of impacts from dispersed development. Specifically, because federal infrastructure projects can affect the progress of dispersed development, the secondary impacts resulting from it must be assessed in documents prepared under the National Environmental Policy Act (NEPA). The Council on Environmental Quality (CEQ) has oversight for NEPA and Section 309 of the Clean Air Act requires that U.S. EPA review and comment on federal agency NEPA documents. The adverse effects of dispersed development can be induced by federal infrastructure projects including transportation, built infrastructure, modifications in natural infrastructure, public land conversion and redevelopment of properties, construction of federal facilities, and large traffic or major growth generation developments requiring federal permits. This paper presents an approach that U.S. EPA reviewers and NEPA practitioners can use to provide accurate, realistic, and consistent analysis of secondary impacts of dispersed development resulting from federal infrastructure projects. It also presents 24 measures that can be used to mitigate adverse impacts from dispersed development by modifying project location and design, participating in preservation or restoration activities, or informing and supporting local communities in planning.

  6. Response to "Collating science-based evidence to inform public opinion on the environmental effects of marine drilling platforms in the Mediterranean Sea".

    Science.gov (United States)

    Haddaway, Neal R

    2017-12-01

    In their recent review article, Mangano and Será (Journal of Environmental Management, 188:195-202) collate and describe the evidence base relating to the impacts of marine drilling platforms in the Mediterranean. The authors claim to have undertaken a systematic map using the Guidelines for Systematic Review in Environmental Management produced by the Collaboration for Environmental Evidence (CEE) as a basis for their methods. Here, I highlight major problems with their methods and the reporting of their activities. I demonstrate that a higher level of rigour and transparency is necessary for a true systematic map. Whilst their work is not without merit and may prove useful for decision-makers, their review could have been conducted and reported to a greater level of reliability. I stress the importance of transparency, comprehensiveness, and repeatability in ensuring that reviews are reliable and fit-for-purpose. I highlight the pitfalls of the authors' approach in terms of: question framing; searching for evidence; the definition of grey literature; key outputs from systematic maps; and the dangers of vote-counting. Copyright © 2017 Elsevier Ltd. All rights reserved.

  7. Clean subglacial access: prospects for future deep hot-water drilling

    Science.gov (United States)

    Pearce, David; Hodgson, Dominic A.; Smith, Andrew M.; Rose, Mike; Ross, Neil; Mowlem, Matt; Parnell, John

    2016-01-01

    Accessing and sampling subglacial environments deep beneath the Antarctic Ice Sheet presents several challenges to existing drilling technologies. With over half of the ice sheet believed to be resting on a wet bed, drilling down to this environment must conform to international agreements on environmental stewardship and protection, making clean hot-water drilling the most viable option. Such a drill, and its water recovery system, must be capable of accessing significantly greater ice depths than previous hot-water drills, and remain fully operational after connecting with the basal hydrological system. The Subglacial Lake Ellsworth (SLE) project developed a comprehensive plan for deep (greater than 3000 m) subglacial lake research, involving the design and development of a clean deep-ice hot-water drill. However, during fieldwork in December 2012 drilling was halted after a succession of equipment issues culminated in a failure to link with a subsurface cavity and abandonment of the access holes. The lessons learned from this experience are presented here. Combining knowledge gained from these lessons with experience from other hot-water drilling programmes, and recent field testing, we describe the most viable technical options and operational procedures for future clean entry into SLE and other deep subglacial access targets. PMID:26667913

  8. Chemical Speciation of Chromium in Drilling Muds

    International Nuclear Information System (INIS)

    Taguchi, Takeyoshi; Yoshii, Mitsuru; Shinoda, Kohzo

    2007-01-01

    Drilling muds are made of bentonite and other clays, and/or polymers, mixed with water to the desired viscosity. Without the drilling muds, corporations could not drill for oil and gas and we would have hardly any of the fuels and lubricants considered essential for modern industrial civilization. There are hundreds of drilling muds used and some kinds of drilling muds contain chromium. The chemical states of chromium in muds have been studied carefully due to concerns about the environmental influence. However it is difficult to determine the chemical state of chromium in drilling muds directly by conventional analytical methods. We have studied the chemical form of chromium in drilling muds by using a laboratory XAFS system and a synchrotron facility

  9. Reduced abrasion drilling fluid

    NARCIS (Netherlands)

    2010-01-01

    A reduced abrasion drilling fluid system and method of drilling a borehole by circulating the reduced abrasion drilling fluid through the borehole is disclosed. The reduced abrasion drilling fluid comprises a drilling fluid, a first additive and a weighting agent, wherein the weighting agent has a

  10. Reduced abrasion drilling fluid

    NARCIS (Netherlands)

    2012-01-01

    A reduced abrasion drilling fluid system and method of drilling a borehole by circulating the reduced abrasion drilling fluid through the borehole is disclosed. The reduced abrasion drilling fluid comprises a drilling fluid, a first additive and a weighting agent, wherein the weighting agent has a

  11. The optimized baseline project: Reinventing environmental restoration at Hanford

    International Nuclear Information System (INIS)

    Goodenough, J.D.; Janaskie, M.T.; Kleinen, P.J.

    1994-01-01

    The U.S. Department of Energy Richland Operations Office (DOE-RL) is using a strategic planning effort (termed the Optimized Baseline Project) to develop a new approach to the Hanford Environmental Restoration program. This effort seeks to achieve a quantum leap improvement in performance through results oriented prioritization of activities. This effort was conducted in parallel with the renegotiation of the Tri-Party Agreement and provided DOE with an opportunity to propose innovative initiatives to promote cost effectiveness, accelerate progress in the Hanford Environmental Restoration Program and involve stakeholders in the decision-making process. The Optimized Baseline project is an innovative approach to program planning and decision-making in several respects. First, the process is a top down, value driven effort that responds to values held by DOE, the regulatory community and the public. Second, planning is conducted in a way that reinforces the technical management process at Richland, involves the regulatory community in substantive decisions, and includes the public. Third, the Optimized Baseline Project is being conducted as part of a sitewide Hanford initiative to reinvent Government. The planning process used for the Optimized Baseline Project has many potential applications at other sites and in other programs where there is a need to build consensus among diverse, independent groups of stakeholders and decisionmakers. The project has successfully developed and demonstrated an innovative approach to program planning that accelerates the pace of cleanup, involves the regulators as partners with DOE in priority setting, and builds public understanding and support for the program through meaningful opportunities for involvement

  12. Environmental impact assessments of wind energy projects: An Alberta example

    International Nuclear Information System (INIS)

    Brown, W.K.

    1993-01-01

    A description is presented of the environmental impact assessment for an Alberta windfarm, summarizing the rationale, process and results of the assessment, costs involved, and recommendations made. The Pe-kun-nee windfarm was designed as a 44 turbine, 9.9 kW windfarm. The assessment included consideration of the complete range of environmental impacts of the windfarm, including reviews of impacts associated with similar developments elsewhere. From an environmental perspective, the proposed site and transmission line route were exceedingly suitable for development. No major potential impacts were identified. Most impacts that could occur, including terrain and vegetation disturbance, were associated with the construction phase of the project. A series of mitigation measures were developed to minimize each identified impact. Monitoring during the operations phase of the development was recommended to: ensure that the revegetation of disturbed areas was adequate; verify the sound level model; and document the incidence of bird strikes. Potential aesthetic impacts were addressed through a proposed interpretive project designed to educate visitors, enhance the profile of the wind-energy industry, and provide local employment. The assessment was completed within 8 months of initiation at a cost less than $200,000

  13. The Hanford Environmental Dose Reconstruction (HEDR) Project: Technical approach

    International Nuclear Information System (INIS)

    Napier, B.A.; Freshley, M.D.; Gilbert, R.O.; Haerer, H.A.; Morgan, L.G.; Rhoads, R.E.; Woodruff, R.K.

    1990-01-01

    Historical measurements and current assessment techniques are being combined to estimate potential radiation doses to people from radioactive releases to the air, the Columbia River, soils, and ground water at the Hanford Site since 1944. Environmental contamination from these releases has been monitored, at varying levels of detail, for 45 yr. Phase I of the Hanford Environmental Reconstruction Project will estimate the magnitude of potential doses, their areal extends, and their associated uncertainties. The Phase I study area comprises 10 counties in eastern Washington and northern Oregon, within a 100-mi radius of the site, including a stretch of the Columbia River that was most significantly affected. These counties contain a range of projected and measured contaminant levels, environmental exposure pathways, and population groups. Phase I dose estimates are being developed for the periods 1944 through 1947 for air pathways and 1964 through 1966 for river pathways. Important radionuclide/pathway combinations include fission products, such as 131 I, in milk for early atmospheric releases and activation products, such as 32 P and 65 Zn, in fish for releases to the river. Potential doses range over several orders of magnitude within the study area. We will expand the time periods and study are in three successive phases, as warranted by results of Phase I

  14. Some environmental impacts associated with project Rio Blanco

    International Nuclear Information System (INIS)

    Alldredge, A.W.; Whicker, F.W.; Hanson, W.C.

    1976-01-01

    Project Rio Blanco, an experiment involving deep underground detonation of three 30-kiloton nuclear explosives designed to stimulate natural gas flow in geologic formations of low permeability, was conducted in western Colorado on 17 May 1973. Environmental impacts associated with this experiment were divided into three categories: radiation, ground motion, and conventional physical activities. The objective of observations made at Rio Blanco was to qualitatively and, where possible, quantitatively ascertain environmental impacts associated with the project. Observations indicated that ground motion and conventional activities appeared to cause the greatest impacts. Ground motion impacts were most severe within 2.4 km of the emplacement well (EW) and were predominantly associated with steep ravine and stream banks and rocky cliffs. Following the detonation, flow and turbidity had increased in a small stream adjacent to the EW. Animals receiving deleterious impacts were those associated with stream banks, cliffs and burrows. No mortality or injury was observed in any large animals. Based on overall results it appears important to give adequate attention to environmental effects resulting from nuclear fracturing experiments

  15. A new drilling method—Earthworm-like vibration drilling

    Science.gov (United States)

    Wang, Peng; Wang, Ruihe

    2018-01-01

    The load transfer difficulty caused by borehole wall friction severely limits the penetration rate and extended-reach limit of complex structural wells. A new friction reduction technology termed “earthworm-like drilling” is proposed in this paper to improve the load transfer of complex structural wells. A mathematical model based on a “soft-string” model is developed and solved. The results show that earthworm-like drilling is more effective than single-point vibration drilling. The amplitude and frequency of the pulse pressure and the installation position of the shakers have a substantial impact on friction reduction and load transfer. An optimization model based on the projection gradient method is developed and used to optimize the position of three shakers in a horizontal well. The results verify the feasibility and advantages of earthworm-like drilling, and establish a solid theoretical foundation for its application in oil field drilling. PMID:29641615

  16. Blue Creek Winter Range: Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir

  17. Tethyan Anhydrite Preserved in the Lower Ocean Crust of the Samail Ophiolite? Evidence from Oman Drilling Project Holes GT1A and 2A

    Science.gov (United States)

    Teagle, D. A. H.; Harris, M.; Crispini, L.; Deans, J. R.; Cooper, M. J.; Kelemen, P. B.; Alt, J.; Banerjee, N.; Shanks, W. C., III

    2017-12-01

    Anhydrite is important in mid-ocean ridge hydrothermal systems because of the high concentrations of calcium and sulfate in modern seawater and anhydrite's retrograde solubility. Because anhydrite hosts many powerful tracers of fluid-rock interactions (87Sr/86Sr, δ18O, δ34S, trace elements, fluid inclusions) it is useful for tracing the chemical evolution of hydrothermal recharge fluids and estimating time-integrated fluid fluxes. Anhydrite can form from heated seawater (>100°C), through water-rock reaction, or by mixing of seawater and hydrothermal fluids. Although abundant in active hydrothermal mounds, and predicted to form from downwelling, warming fluids during convection, anhydrite is rare in drill core from seafloor lavas, sheeted dikes and upper gabbros, with only minor amounts in ODP Holes 504B and 1256D. Because anhydrite can dissolve during weathering, its occurrence in ophiolites is unexpected. Instead, gypsum is present in Macquarie Island lavas and Miocene gypsum fills cavities within the Cretaceous Troodos ore deposits. Thus, the occurrence of numerous anhydrite veins in cores from the gabbroic lower crust of the Samail ophiolite in Oman was unanticipated. To our knowledge, anhydrite in Oman gabbros has not been previously reported. Oman Drilling Project Holes GT1A and GT2A were drilled into the Wadi Gideah section of the Wadi Tayin massif. Both recovered 400 m of continuous core from sections of layered gabbros (GT1) and the foliated-layered gabbro transition (GT2). Anhydrite is present throughout both holes, some in vein networks but more commonly as isolated 1-110 mm veins (>60 mm ave). Anhydrite is mostly the sole vein filling but can occur with greenschist minerals such as epidote, quartz, chlorite and prehnite. Anhydrite commonly exhibits prismatic and bladed textures but can also be capriciously microcrystalline. Though definitive cross cutting relationships are elusive, anhydrite veins cut across some greenschist veins. Anhydrite is

  18. 78 FR 43183 - Notice of Availability for Sharpe Permit Relinquishment Project Environmental Assessment Finding...

    Science.gov (United States)

    2013-07-19

    ... for Sharpe Permit Relinquishment Project Environmental Assessment Finding of No Significant Impact... Relinquishment Project Environmental Assessment (EA) Finding of No Significant Impact (FONSI). SUMMARY: On April... environment. Human environment was interpreted comprehensively to include the natural and physical environment...

  19. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    International Nuclear Information System (INIS)

    2005-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004

  20. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  1. Exploration drilling and ecology. A contribution to the MER (Environmental Effect Report) of the NAM (Netherlands Petroleum Company) for the benefit of exploration drilling for natural gas in the Waddenzee and the North Sea coastal area

    International Nuclear Information System (INIS)

    Dankers, N.; Wintermans, G.J.M.

    1996-01-01

    Within the framework of the title drilling activities the NAM carries out a MER. Several research institutes were asked to contribute to the MER. The authors' institute was asked to describe the ecology of the exploration areas in the Wadden Sea, as well as the possible effects of the exploration drilling on the ecology. In this report only the impact for the Wadden Sea is dealt with. In chapter 1 the ecology of the Wadden Sea is discussed in detail for the subjects primary production (photosynthesis), secondary production (consumption of vegetable organic materials), birds, seals, and societal functions. In chapter 2 specific aspects of specific sites are outlined. In chapter 3 an overview (the so-called factor train) is given of the activities around the exploration drilling of the NAM in the Wadden Sea and the disturbances that can be the result of those activities. In chapter 4 the possible effects of exploration drilling on birds and seals are discussed for each drilling site

  2. Environmental Project of I.E.S. Antoni Maura

    Science.gov (United States)

    Crespi Salom, Pere

    2010-05-01

    Environmental Project of I.E.S. Antoni Maura Author(s): Pere Crespí i Salom Teacher of Department of Biology and Geology and Environmental Coordinator (2009-2010) from I.E.S. Antoni Maura . Mallorca. Illes Balears. Spain Teachers participating in the project : Myriam Fuentes Milani, Olga Ballester Nebot, Antoni Salom Ruiz, Julio René Loayza Casanova, Puy Aguirre Rémirez, Yolanda Martínez Laserna, Jaume Puppo Lama, Carme Arrom , Dolors Aguiló Segura, Marga Ordinas Boter, Angel Fernàndez Albertí , Immaculada Suau López, Antònia Florit Torrandell, Isabel Mateu Arcos, Román Piña Valls i Pere Crespí Salom. Our institute takes part since 2004 in adapting environmentally the schools in the Balearics which consists of developing activities which aim is that both teachers and students acquire habits so as to apply to their ordinary lives though different participative commissions ( 10-15 teachers): 1st commission: recycling and reusing materials. Enough bins in the classrooms and floors: yellow for plastic, blue for paper, and green for the other. We tend to use recycled materials in different celebrations such as Carnival, Christmas, Saint Jordi and Environmental day. We also organise workshops for the teachers to develop afterwards with the students and nature of environmental exposures. 2nd commission: Scatter information ( MonMaura, Maurifull, Green window and website).Throughout different means we inform the teachers and students about all the school activities and where to consult.( www.iesantonimaura.net, Playful area , environmental project ). 3rd commission: Reusing text books.( there is a students service of borrowing books and giving them back at the end of the school year if the book is in good use.) 4th commission: Improving the school surroundings, the back garden and garden with native plants. Department of Biology and Geology is responsible for caring for an organic garden and in turn improve the center's garden with native plants within the

  3. Discussion on the post-project assessment of environmental impact for nuclear facilities

    International Nuclear Information System (INIS)

    Shang Zhaorong

    2013-01-01

    The paper introduces the background of post-project assessment of environmental impact in the world and focuses on the characteristic of environmental impact assessment for Chinese nuclear facilities construction projects, analyzes the necessity, principle and contents of post-project assessment of environmental impact on current Chinese nuclear facilities operation. It is considered that to start the post-project assessment of environmental impact, perfect the post-project assessment mechanism, introduce the post-project assessment into environmental impact assessment system are just at the night time. (author)

  4. Trends in the Drilling Waste Management

    Directory of Open Access Journals (Sweden)

    Lucyna Czekaj

    2006-10-01

    Full Text Available Petroleum Industry is trying to achieve sustainable development goals. Each year new solutions are implemented to minimize the environmental impact of drilling operations. The paper presents trends in the drilling waste management caused by introducing the sustainable development into the petroleum industry. Old solutions such as the drilling waste disposal at the waste dump or dumping ground are not acceptable from the environmental point of view. The paper presents an analysis of new solutions as the sustainable solutions. The most important problem is the chemical pollution in cuttings and the waste drilling mud. The industrial solutions as well as the laboratory research on the pollution removing from drilling wastes are analysed. The most promising method seems to be the recycling and design for the environment of drilling mud.

  5. Environmental assessment of the projected uses for geopressured waters

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, J.S.; Manning, J.A.; Meriwether, J.

    1977-11-16

    An assessment of possible environmental effects of the use of geopressured water of the Texas and Louisiana Gulf Coast has been made. The uses considered include generation of electric power, production of low pressure steam for process heat and the direct use of the hot water for space heating. Based upon the projected uses, the direct and indirect emissions are estimated and the impact of these emissions upon the environment are discussed. The possible impacts of the production of large volumes of geopressured fluids are also considered in terms of possibility of subsidence and earthquakes. A summary of available analyses of Gulf Coast deep waters is listed as a guide for estimating expected emissions. Primary environmental problems are identified as waste brine disposal, accidental releases of brines, and subsidence. Minor problems such as cooling tower blowdown streams, noncondensable gas emissions, wind drift from exhaust plumes, noise levels, and construction activities are considered.

  6. Environmental Assessment -- Test Area North pool stabilization project update

    International Nuclear Information System (INIS)

    1997-08-01

    The purpose of this Environmental Assessment (EA) is to update the ''Test Area North Pool Stabilization Project'' EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped from the EA/FONSI issued May 6, 1996. A new drying process was subsequently developed and is analyzed in Section 2.1.2 of this document. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN

  7. Draft environmental assessment -- Test Area North pool stabilization project update

    International Nuclear Information System (INIS)

    1997-06-01

    The purpose of this Environmental Assessment (EA) is to update the ''Test Area North Pool Stabilization Project'' EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped form the Ea/FONSI issued May 6, 1996. The origin and nature of the TMI core debris and the proposed drying process are described and analyzed in detail in this EA. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN

  8. An overview of the Environmental Monitoring Computer Automation Project

    International Nuclear Information System (INIS)

    Johnson, S.M.; Lorenz, R.

    1992-01-01

    The Savannah River Site (SRS) was bulk to produce plutonium and tritium for national defense. As a result of site operations, routine and accidental releases of radionuclides have occurred. The effects these releases have on the k>cal population and environment are of concern to the Department of Energy (DOE) and SRS personnel. Each year, approximately 40,000 environmental samples are collected. The quality of the samples, analytical methods and results obtained are important to site personnel. The Environmental Monitoring Computer Automation Project (EMCAP) was developed to better manage scheduling, log-in, tracking, analytical results, and report generation. EMCAP can be viewed as a custom Laboratory Information Management System (LIMS) with the ability to schedule samples, generate reports, and query data. The purpose of this paper is to give an overview of the SRS environmental monitoring program, describe the development of EMCAP software and hardware, discuss the different software modules, show how EMCAP improved the Environmental Monitoring Section program, and examine the future of EMCAP at SRS

  9. Drilling for improvement : Statoil and Halliburton report significant cost savings and more accurate well placement at the Leismer demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Jaremko, D.

    2010-07-15

    This article discussed new improvements in steam assisted gravity drainage (SAGD) made by Statoil and Halliburton at the Leismer demonstration project. The Leismer project is Statoil's inaugural project in oil sands development, and will have a capacity to produce 10,000 barrels per day through 4 separate well pads with 23 well pairs. Challenges to the project included the long lateral sections required for the well pairs to remain parallel to each other while remaining within the target formation. An azimuthal deep resistivity (ADR) tool was used to detect the proximity of the wellbore to shale and water zones. Use of the tool allowed operators to modify the planned well trajectory in order to optimize placements within the reservoir. A rotary steerable system (RSS) was used increase injection times. The project was completed 6 to 8 weeks ahead of schedule. Applications have now been filed for a further 10 phases that will produce 240,000 barrels per day. 1 fig.

  10. Development of the UMTRA Project Groundwater Environmental Impact Statement

    International Nuclear Information System (INIS)

    Burt, C.; Ulland, L.; Metzler, D.

    1993-01-01

    This paper discusses the development and preparation of the Programmatic Environmental Impact Statement (PEIS) for the Uranium Mill Tailings Remedial Action (UMTRA) Groundwater Restoration Project. The initiation of the scoping process and preparation of the PEIS began when the Notice of Intent (NOI) to prepare the PEIS was published in the Federal Register on November 18, 1992. However, planning for the PEIS began well before the publication of the NOI, with various aspects of the PEIS, such as the initial formulation of the alternatives and the format of the scoping process, being developed early on. During this preliminary planning phase, it became clear that the preparation of this PEIS posed some significant challenges while at the same time provided for significant opportunities. This paper will briefly summarize the UMTRA Project, discuss the major sections in the PEIS, and describe the challenges and opportunities that developed during the preparation of the PEIS

  11. Integration of models for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Napier, B.A.

    1991-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation dose that individuals could have received as a result of emissions from nuclear operations at Hanford since 1944. The objective of phase 1 of the project was to demonstrate through calculations that adequate models and support data exist or could be developed to allow realistic estimations of doses to individuals from releases of radionuclides to the environment that occurred as long as 45 years ago. Much of the data used in phase 1 was preliminary; therefore, the doses calculated must be considered preliminary approximations. This paper describes the integration of various models that was implemented for initial computer calculations. Models were required for estimating the quantity of radioactive material released, for evaluating its transport through the environment, for estimating human exposure, and for evaluating resultant doses

  12. Environmental information volume: Liquid Phase Methanol (LPMEOH{trademark}) project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The purpose of this project is to demonstrate the commercial viability of the Liquid Phase Methanol Process using coal-derived synthesis gas, a mixture of hydrogen and carbon monoxide. This report describes the proposed actions, alternative to the proposed action, the existing environment at the coal gasification plant at Kingsport, Tennessee, environmental impacts, regulatory requirements, offsite fuel testing, and DME addition to methanol production. Appendices include the air permit application, solid waste permits, water permit, existing air permits, agency correspondence, and Eastman and Air Products literature.

  13. Environmental information volume: Liquid Phase Methanol (LPMEOH trademark) project

    International Nuclear Information System (INIS)

    1996-05-01

    The purpose of this project is to demonstrate the commercial viability of the Liquid Phase Methanol Process using coal-derived synthesis gas, a mixture of hydrogen and carbon monoxide. This report describes the proposed actions, alternative to the proposed action, the existing environment at the coal gasification plant at Kingsport, Tennessee, environmental impacts, regulatory requirements, offsite fuel testing, and DME addition to methanol production. Appendices include the air permit application, solid waste permits, water permit, existing air permits, agency correspondence, and Eastman and Air Products literature

  14. The Rocky Flats Environmental Technology Site beryllium characterization project

    International Nuclear Information System (INIS)

    Morrell, D.M.; Miller, J.R.; Allen, D.F.

    1999-01-01

    A site beryllium characterization project was completed at the Rocky Flats Environmental Technology Site (RFETS) in 1997. Information from historical reviews, previous sampling surveys, and a new sampling survey were used to establish a more comprehensive understanding of the locations and levels of beryllium contamination in 35 buildings. A feature of the sampling strategy was to test if process knowledge was a good predictor of where beryllium contamination could be found. Results revealed that this technique was effective at identifying where surface contamination levels might exceed the RFETS smear control level but that it was not effective in identifying where low concentrations of beryllium might be found

  15. [Nuclear energy and environment: review of the IAEA environmental projects].

    Science.gov (United States)

    Fesenko, S; Fogt, G

    2012-01-01

    The review of the environmental projects of the International Atomic Energy Agency is presented. Basic IAEA documents intended to protect humans and the Environment are considered and their main features are discussed. Some challenging issues in the area of protection of the Environment and man, including the impact of nuclear facilities on the environment, radioactive waste management, and remediation of the areas affected by radiological accidents, nuclear testing and sites of nuclear facilities are also discussed. The need to maintain the existing knowledge in radioecology and protection of the environment is emphasised.

  16. Environmental Restoration Disposal Facility (Project W-296) Safety Assessment

    International Nuclear Information System (INIS)

    Armstrong, D.L.

    1994-08-01

    This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment

  17. Environmental Restoration Disposal Facility (Project W-296) Safety Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Armstrong, D.L.

    1994-08-01

    This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment.

  18. The Chinese Cretaceous Continental Scientific Drilling Project in the Songliao Basin, NE China: Organic-rich source rock evaluation with geophysical logs from Borehole SK-2

    Science.gov (United States)

    Zhang, X.; Zou, C.

    2017-12-01

    The Cretaceous strata have been recognized as an important target of oil or gas exploration in the Songliao Basin, northeast China. The second borehole (SK-2) of the Chinese Cretaceous Continental Scientific Drilling Project in the Songliao Basin (CCSD-SK) is the first one to drill through the Cretaceous continental strata in the frame of ICDP. It was designed not only to solve multiple scientific problems (including the Cretaceous paleoenvironment and paleoclimate, as well as deep resources exploration of the Songliao Basin), but also to expect to achieve new breakthroughs in oil and gas exploration. Based on the project, various geophysical log data (including gamma, sonic, resistivity, density etc.) and core samples have been collected from Borehole SK-2. We do research on organic-rich source rocks estimation using various geophysical log data. Firstly, we comprehensively analyzed organic-rich source rocks' geophysical log response characteristics. Then, source rock's identification methods were constructed to identify organic-rich source rocks with geophysical logs. The main identification methods include cross-plot, multiple overlap and Decision Tree method. Finally, the technique and the CARBOLOG method were applied to evaluate total organic carbon (TOC) content from geophysical logs which provide continuous vertical profile estimations (Passey, 1990; Carpentier et al., 1991). The results show that source rocks are widely distributed in Borehole SK-2, over a large depth strata (985 5700m), including Nenjiang, Qingshankou, Denglouku, Yingcheng, Shahezi Formations. The organic-rich source rocks with higher TOC content occur in the Qingshankou (1647 1650m), Denglouku (2534 2887m) and Shahezi (3367 5697m) Formations. The highest TOC content in these formations can reach 10.31%, 6.58%, 12.79% respectively. The bed thickness of organic-rich source rocks in the these formations are totally up to 7.88m, 74.34m, 276.60m respectively. These organic-rich rocks in the

  19. Navajo transmission project Draft Environmental Impact Statement (DEIS)

    International Nuclear Information System (INIS)

    1996-09-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to either the Mead or the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Comers area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Comers/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Alternatives considered include energy conservation and electric load management, new generation facilities, use of existing transmission systems, alternative transmission technologies, no action, and the proposed action. For the proposed action, several alternative routes and ancillary facility locations are addressed: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources, and the impact of the transmission line's presence on visual resources and land uses

  20. New optimized drill pipe size for deep-water, extended reach and ultra-deep drilling

    Energy Technology Data Exchange (ETDEWEB)

    Jellison, Michael J.; Delgado, Ivanni [Grant Prideco, Inc., Hoston, TX (United States); Falcao, Jose Luiz; Sato, Ademar Takashi [PETROBRAS, Rio de Janeiro, RJ (Brazil); Moura, Carlos Amsler [Comercial Perfuradora Delba Baiana Ltda., Rio de Janeiro, RJ (Brazil)

    2004-07-01

    A new drill pipe size, 5-7/8 in. OD, represents enabling technology for Extended Reach Drilling (ERD), deep water and other deep well applications. Most world-class ERD and deep water wells have traditionally been drilled with 5-1/2 in. drill pipe or a combination of 6-5/8 in. and 5-1/2 in. drill pipe. The hydraulic performance of 5-1/2 in. drill pipe can be a major limitation in substantial ERD and deep water wells resulting in poor cuttings removal, slower penetration rates, diminished control over well trajectory and more tendency for drill pipe sticking. The 5-7/8 in. drill pipe provides a significant improvement in hydraulic efficiency compared to 5-1/2 in. drill pipe and does not suffer from the disadvantages associated with use of 6-5/8 in. drill pipe. It represents a drill pipe assembly that is optimized dimensionally and on a performance basis for casing and bit programs that are commonly used for ERD, deep water and ultra-deep wells. The paper discusses the engineering philosophy behind 5-7/8 in. drill pipe, the design challenges associated with development of the product and reviews the features and capabilities of the second-generation double-shoulder connection. The paper provides drilling case history information on significant projects where the pipe has been used and details results achieved with the pipe. (author)

  1. 18 CFR 430.11 - Advance notice of exploratory drilling.

    Science.gov (United States)

    2010-04-01

    ... exploratory drilling. 430.11 Section 430.11 Conservation of Power and Water Resources DELAWARE RIVER BASIN... exploratory drilling. The Commission encourages consultation with any project sponsor who is considering... project and prior to initiation of exploratory drilling. (a) Any person, firm corporation or other entity...

  2. Discussion on the method of environmental radiological impact assessment for the highway construction project

    International Nuclear Information System (INIS)

    Qiu Guohua

    2008-01-01

    Based on the characteristics and environmental radiological impact of the highway construction project, the basic procedure of environmental radiological impact assessment for the highway construction project is put forward, including analysis and determination of contamination sources, selection of evaluation factors, determination of assessment range and dose limit, environmental investigation, environmental impact prediction and assessment. The working method of each procedure is analyzed. (authors)

  3. Innovative approach for restoring coastal wetlands using treated drill cuttings

    International Nuclear Information System (INIS)

    Veil, J. A.; Hocking, E. K.

    1999-01-01

    The leading environmental problem facing coastal Louisiana regions is the loss of wetlands. Oil and gas exploration and production activities have contributed to wetland damage through erosion at numerous sites where canals have been cut through the marsh to access drilling sites. An independent oil and gas producer, working with Southeastern Louisiana University and two oil field service companies, developed a process to stabilize drill cuttings so that they could be used as a substrate to grow wetlands vegetation. The U.S. Department of Energy (DOE) funded a project under which the process would be validated through laboratory studies and field demonstrations. The laboratory studies demonstrated that treated drill cuttings support the growth of wetlands vegetation. However, neither the Army Corps of Engineers (COE) nor the U.S. Environmental Protection Agency (EPA) would grant regulatory approval for afield trial of the process. Argonne National Laboratory was asked to join the project team to try to find alternative mechanisms for gaining regulatory approval. Argonne worked with EPA's Office of Reinvention and learned that EPA's Project XL would be the only regulatory program under which the proposed field trial could be done. One of the main criteria for an acceptable Project XL proposal is to have a formal project sponsor assume the responsibility and liability for the project. Because the proposed project involved access to private land areas, the team felt that an oil and gas company with coastal Louisiana land holdings would need to serve as sponsor. Despite extensive communication with oil and gas companies and industry associations, the project team was unable to find any organization willing to serve as sponsor. In September 1999, the Project XL proposal was withdrawn and the project was canceled

  4. Economic and environmental evaluation of investment projects of biogas plants

    International Nuclear Information System (INIS)

    Guzmán Marrero, Elizabeth; Guzmán Chinea, Jesús Manuel; Mata Varela, Milagros C.; Pérez González, Yanet

    2015-01-01

    The economic evaluation of the implementation and use of renewable energy is an issue of paramount importance and has been approached from different perspectives by different authors in different countries. Biogas technology has its own characteristics that make it more complex analysis involved not only in this case the energy aspect but there is also a significant impact on health assessment difficult, fertilization, soil improvement, animal feed and improved conditions of life. The capital budgeting, in conjunction with the planning process, is a key economic tool for decision making and in turn represents an ongoing challenge for the agricultural sector. It is a necessity of our country, together with the entire world, potentiate the action to correct management of organic waste generated in intensive pig farming, to contribute to the reduction of environmental impacts that this work causes. Studies in this area show the shortcomings that exist in Cuban law established for the evaluation of investment projects, both in its structure and in its cycle, without taking into account important elements such as risk analysis. This research evaluates the economic and financial feasibility of an investment project, including a social and environmental assessment of the same financial justification for the inclusion of risk analysis in the evaluation process (full text)

  5. Response to the independent technical review of the UMTRA Project procedures and practices for well drilling and development

    International Nuclear Information System (INIS)

    1994-07-01

    This report is a response to the findings and recommendations contained in the ITR report. The text of this document summarizes each ITR finding and recommendation, presents the TAC response, and concludes that implementation of many of the recommendations would benefit the UMTRA Project. Implementation of the recommendations represents ongoing improvement to the TAC well installation and development procedures and will result, in lower overall project costs. Appendix B is an implementation plan that groups similar or complementary action items, provides a schedule for implementation, identifies the group or people responsible for the changes, and estimates hours to implement the changes. The four major action items are as follows: (1) ITR Reevaluation, (2) Well Installation SOP Review and Revision, (3) Well Installation Contract Review and Revision, and (4) TAC and DOE Communications Improvement. The hours listed to implement the improvements are intended to be estimates for budgeting and planning purposes for the remainder of this fiscal year and the upcoming fiscal year

  6. Response to the independent technical review of the UMTRA Project procedures and practices for well drilling and development

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This report is a response to the findings and recommendations contained in the ITR report. The text of this document summarizes each ITR finding and recommendation, presents the TAC response, and concludes that implementation of many of the recommendations would benefit the UMTRA Project. Implementation of the recommendations represents ongoing improvement to the TAC well installation and development procedures and will result, in lower overall project costs. Appendix B is an implementation plan that groups similar or complementary action items, provides a schedule for implementation, identifies the group or people responsible for the changes, and estimates hours to implement the changes. The four major action items are as follows: (1) ITR Reevaluation, (2) Well Installation SOP Review and Revision, (3) Well Installation Contract Review and Revision, and (4) TAC and DOE Communications Improvement. The hours listed to implement the improvements are intended to be estimates for budgeting and planning purposes for the remainder of this fiscal year and the upcoming fiscal year.

  7. X-ray Fluorescence Core Scanning of Oman Drilling Project Holes BT1B and GT3A Cores on D/V CHIKYU

    Science.gov (United States)

    Johnson, K. T. M.; Kelemen, P. B.; Michibayashi, K.; Greenberger, R. N.; Koepke, J.; Beinlich, A.; Morishita, T.; Jesus, A. P. M.; Lefay, R.

    2017-12-01

    The JEOL JSX-3600CA1 energy dispersive X-ray fluorescence core logger (XRF-CL) on the D/V Chikyu provides quantitative element concentrations of scanned cores. Scans of selected intervals are made on an x-y grid with point spacing of 5 mm. Element concentrations for Si, Al, Ti, Ca, Mg, Mn, Fe, Na, K, Cr, Ni, S and Zn are collected for each point on the grid. Accuracy of element concentrations provided by the instrument software is improved by applying empirical correction algorithms. Element concentrations were collected for 9,289 points from twenty-seven core intervals in Hole BT1B (basal thrust) and for 6,389 points from forty core intervals in Hole GT3A (sheeted dike-gabbro transition) of the Oman Drilling Project on the D/V Chikyu XRF-CL during Leg 2 of the Oman Drilling Project in August-September, 2017. The geochemical data are used for evaluating downhole compositional details associated with lithological changes, unit contacts and mineralogical variations and are particularly informative when plotted as concentration contour maps or downhole concentration diagrams. On Leg 2 additional core scans were made with X-ray Computed Tomography (X-ray CT) and infrared images from the visible-shortwave infrared imaging spectroscopy (IR) systems on board. XRF-CL, X-ray CT and IR imaging plots used together provide detailed information on rock compositions, textures and mineralogy that assist naked eye visual observations. Examples of some uses of XRF-CL geochemical maps and downhole data are shown. XRF-CL and IR scans of listvenite clearly show zones of magnesite, dolomite and the Cr-rich mica, fuchsite that are subdued in visual observation, and these scans can be used to calculate variations in proportions of these minerals in Hole BT1B cores. In Hole GT3A XRF-CL data can be used to distinguish compositional changes in different generations of sheeted dikes and gabbros and when combined with visual observations of intrusive relationships the detailed geochemical

  8. Optimised Environmental Test Approaches in the GOCE Project

    Science.gov (United States)

    Ancona, V.; Giordano, P.; Casagrande, C.

    2004-08-01

    The Gravity Field and Steady-State Ocean Circulation Explorer (GOCE) is dedicated to measuring the Earth's gravity field and modelling the geoid with extremely high accuracy and spatial resolution. It is the first Earth Explorer Core mission to be developed as part of ESA's Living Planet Programme and is scheduled for launch in 2006. The program is managed by a consortium of European companies: Alenia Spazio, the prime contractor, Astrium GmbH, the platform responsible, Alcatel Space Industries and Laben, suppliers of the main payloads, respectively the Electrostatic Gravity Gradiometer (EGG) and the Satellite to Satellite Tracking Instrument (SSTI), actually a precise GPS receiver. The GOCE Assembly Integration and Verification (AIV) approach is established and implemented in order to demonstrate to the customer that the satellite design meets the applicable requirements and to qualify and accept from lower level up to system level. The driving keywords of "low cost" and "short schedule" program, call for minimizing the development effort by utilizing off-the-shelf equipment combined with a model philosophy lowering the number of models to be used. The paper will deal on the peculiarities of the optimized environmental test approach in the GOCE project. In particular it introduces the logic of the AIV approach and describe the foreseen tests at system level within the SM environmental test campaign, outlining the Quasi Static test performed in the frame of the SM sine vibration tests, and the PFM environmental test campaign pinpointing the deletion of the Sine Vibration test on PFM model. Furthermore the paper highlights how the Model and Test Effectiveness Database (MATD) can be utilized for the prediction of the new space projects like GOCE Satellite.

  9. CNR LARA project, Italy: Airborne laboratory for environmental research

    Science.gov (United States)

    Bianchi, R.; Cavalli, R. M.; Fiumi, L.; Marino, C. M.; Pignatti, S.

    1995-01-01

    The increasing interest for the environmental problems and the study of the impact on the environment due to antropic activity produced an enhancement of remote sensing applications. The Italian National Research Council (CNR) established a new laboratory for airborne hyperspectral imaging, the LARA Project (Laboratorio Aero per Ricerche Ambientali - Airborne Laboratory for Environmental Research), equipping its airborne laboratory, a CASA-212, mainly with the Daedalus AA5000 MIVIS (Multispectral Infrared and Visible Imaging Spectrometer) instrument. MIVIS's channels, spectral bandwidths, and locations are chosen to meet the needs of scientific research for advanced applications of remote sensing data. MIVIS can make significant contributions to solving problems in many diverse areas such as geologic exploration, land use studies, mineralogy, agricultural crop studies, energy loss analysis, pollution assessment, volcanology, forest fire management and others. The broad spectral range and the many discrete narrow channels of MIVIS provide a fine quantization of spectral information that permits accurate definition of absorption features from a variety of materials, allowing the extraction of chemical and physical information of our environment. The availability of such a hyperspectral imager, that will operate mainly in the Mediterranean area, at the present represents a unique opportunity for those who are involved in environmental studies and land-management to collect systematically large-scale and high spectral-spatial resolution data of this part of the world. Nevertheless, MIVIS deployments will touch other parts of the world, where a major interest from the international scientific community is present.

  10. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    International Nuclear Information System (INIS)

    Williams, C.V.; Burford, T.D.

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy's (DOE's) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID's technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID

  11. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Williams, C.V.; Burford, T.D. [Sandia National Labs., Albuquerque, NM (United States). Environmental Restoration Technologies; Allen, C.A. [Tech Reps, Inc., Albuquerque, NM (United States)

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy`s (DOE`s) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID`s technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID.

  12. Environmental Assessment of the Hawaii Geothermal Project Well Flow Test Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-11-01

    The Hawaii Geothermal Project, a coordinated research effort of the University of Hawaii, funded by the County and State of Hawaii, and ERDA, was initiated in 1973 in an effort to identify, generate, and use geothermal energy on the Big Island of Hawaii. A number of stages are involved in developing geothermal power resources: exploration, test drilling, production testing, field development, power plant and powerline construction, and full-scale production. Phase I of the Project, which began in the summer of 1973, involved conducting exploratory surveys, developing analytical models for interpretation of geophysical results, conducting studies on energy recovery from hot brine, and examining the legal and economic implications of developing geothermal resources in the state. Phase II of the Project, initiated in the summer of 1975, centers on drilling an exploratory research well on the Island of Hawaii, but also continues operational support for the geophysical, engineering, and socioeconomic activities delineated above. The project to date is between the test drilling and production testing phase. The purpose of this assessment is to describe the activities and potential impacts associated with extensive well flow testing to be completed during Phase II.

  13. Optimizing drilling performance using a selected drilling fluid

    Science.gov (United States)

    Judzis, Arnis [Salt Lake City, UT; Black, Alan D [Coral Springs, FL; Green, Sidney J [Salt Lake City, UT; Robertson, Homer A [West Jordan, UT; Bland, Ronald G [Houston, TX; Curry, David Alexander [The Woodlands, TX; Ledgerwood, III, Leroy W.

    2011-04-19

    To improve drilling performance, a drilling fluid is selected based on one or more criteria and to have at least one target characteristic. Drilling equipment is used to drill a wellbore, and the selected drilling fluid is provided into the wellbore during drilling with the drilling equipment. The at least one target characteristic of the drilling fluid includes an ability of the drilling fluid to penetrate into formation cuttings during drilling to weaken the formation cuttings.

  14. Large-scale projects between regional planning and environmental protection

    International Nuclear Information System (INIS)

    Schmidt, G.

    1984-01-01

    The first part of the work discusses the current law of land-use planning, municipal and technical construction planning, and licensing under the atomic energy law and the federal law on immission protection. In the second part some theses suggesting modifications are submitted. In the sector of land-use planning substantial contributions to the protection of the environment can only be expected from programs and plans (aims). For the environmental conflicts likely to arise from large-scale projects (nuclear power plant, fossil-fuel power plant) this holds good for the most part of site selection plans. They have bearings on environmental protection in that they presuppose thorough examination of facts, help to recognize possible conflicts at an early date and provide a frame for solving those problems. Municipal construction planning is guided by the following principles: Environmental protection is an equivalent planning target. Environmental data and facts and their methodical processing play a fundamental part as they constitute the basis of evaluation. Under the rules and regulations of the federal law on immission protection, section 5, number 2 - prevention of nuisances - operators are obliged to take preventive care of risks. That section is not concerned with planning or distribution. Neither does the licensing of nuclear plants have planning character. So far as the legal preconditions of licensing are fulfilled, the scope for rejection of an application under section 7, subsection 2 of the atomic energy law in view of site selection and requirement of a plant hardly carries any practical weight. (orig./HP) [de

  15. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  16. Drilling a better pair : new technologies in SAGD directional drilling

    Energy Technology Data Exchange (ETDEWEB)

    Zimmer, C.; Richter, D. [Statoil Canada Ltd., Calgary, AB (Canada); Person, J.; Tilley, J.; Bittar, M. [Halliburton Energy Services, Calgary, AB (Canada)

    2010-07-01

    The Leismer Demonstration Project (LDP) is the first of 8 proposed major steam assisted gravity drainage (SAGD) projects for Statoil's Kai Kos Dehseh (KKD) asset in the Athabasca oil sands deposit. The bitumen resources are expected to produce approximately 2.2 billion barrels of oil over approximately 35 years with a peak production of 220,000 bbl/day. To date, 23 well pairs have been drilled on 4 drilling pads. The precise placement of well pairs is among the most important factors in a successful SAGD drilling program. The producer well must be placed in relation to the reservoir boundaries. It must also be accurately twinned with the injector well. A strong focus on technological innovation is needed in order to deliver on these high expectations in unconsolidated formations, such as the McMurray oil sands. Lateral SAGD pairs are often drilled with conventional steerable mud motors and logging-while-drilling (LWD) resistivity measurements, but this combination imposes certain limitations in terms of wellbore quality and placement. Several industry firsts were successfully implemented at the Statoil LDP, including a combination of the newest and most cutting-edge directional, measurement, and LWD technology. The keystone of these industry firsts was the use of a soft formation modified, point-the-bit rotary steerable system (RSS), used on 20 horizontal wells. The RRS was combined with an ultra deep azimuthal resistivity sensor to provide precise geosteering along the bottom bed boundary in the producer wells, resulting in improved reservoir capture and reservoir characterization. This paper described the new drilling system and its impact on the progressive future of directional drilling in SAGD. 8 refs., 1 tab., 22 figs.

  17. Navajo transmission project. Final Environmental Impact Statement (FEIS)

    International Nuclear Information System (INIS)

    1997-08-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Corners area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Corners/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Six alternatives were considered and include (1) energy conservation and electric load management, (2) new generation facilities, (3) use of existing transmission systems, (4) alternative transmission technologies, (5) no action, and (6) the proposed action. For the proposed action, the following alternative routes and ancillary facility locations are addressed in the EIS: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described, and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources; and the impact of the transmission line's presence on visual resources and land uses. Public comments on the draft EIS are addressed in this FEIS

  18. Phase 1 of the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    1991-08-01

    The work described in this report was prompted by the public's concern about potential effect from the radioactive materials released from the Hanford Site. The Hanford Environmental Dose Reconstruction (HEDR) Project was established to estimate radiation dose the public might have received from the Hanford Site since 1944, when facilities began operating. Phase 1 of the HEDR Project is a ''pilot'' or ''demonstration'' phase. The objectives of this initial phase were to determine whether enough historical information could be found or reconstructed to be used for dose estimation and develop and test conceptual and computational models for calculating credible dose estimates. Preliminary estimates of radiation doses were produced in Phase 1 because they are needed to achieve these objectives. The reader is cautioned that the dose estimates provided in this and other Phase 1 HEDR reports are preliminary. As the HEDR Project continues, the dose estimates will change for at least three reasons: more complete input information for models will be developed; the models themselves will be refined; and the size and shape of the geographic study area will change. This is one of three draft reports that summarize the first phase of the four-phased HEDR Project. This, the Summary Report, is directed to readers who want a general understanding of the Phase 1 work and preliminary dose estimates. The two other reports -- the Air Pathway Report and the Columbia River Pathway Report -- are for readers who understand the radiation dose assessment process and want to see more technical detail. Detailed descriptions of the dose reconstruction process are available in more than 20 supporting reports listed in Appendix A. 32 refs., 46 figs

  19. Screening Assessment of Potential Human-Health Risk from Future Natural-Gas Drilling Near Project Rulison in Western Colorado

    International Nuclear Information System (INIS)

    Daniels, Jeffrey I.; Chapman, Jenny B.

    2012-01-01

    The Project Rulison underground nuclear test was conducted in 1969 at a depth of 8,400 ft in the Williams Fork Formation of the Piceance Basin, west-central Colorado (Figure 1). The U.S. Department of Energy Office of Legacy Management (LM) is the steward of the site. Their management is guided by data collected from past site investigations and current monitoring, and by the results of calculations of expected behavior of contaminants remaining in the deep subsurface. The purpose of this screening risk assessment is to evaluate possible health risks from current and future exposure to Rulison contaminants so the information can be factored into LM's stewardship decisions. For example, these risk assessment results can inform decisions regarding institutional controls at the site and appropriate monitoring of nearby natural-gas extraction activities. Specifically, the screening risk analysis can provide guidance for setting appropriate action levels for contaminant monitoring to ensure protection of human health.

  20. Screening Assessment of Potential Human-Health Risk from Future Natural-Gas Drilling Near Project Rulison in Western Colorado

    Energy Technology Data Exchange (ETDEWEB)

    Daniels Jeffrey I.,Chapman Jenny B.

    2012-01-01

    The Project Rulison underground nuclear test was conducted in 1969 at a depth of 8,400 ft in the Williams Fork Formation of the Piceance Basin, west-central Colorado (Figure 1). The U.S. Department of Energy Office of Legacy Management (LM) is the steward of the site. Their management is guided by data collected from past site investigations and current monitoring, and by the results of calculations of expected behavior of contaminants remaining in the deep subsurface. The purpose of this screening risk assessment is to evaluate possible health risks from current and future exposure to Rulison contaminants so the information can be factored into LM's stewardship decisions. For example, these risk assessment results can inform decisions regarding institutional controls at the site and appropriate monitoring of nearby natural-gas extraction activities. Specifically, the screening risk analysis can provide guidance for setting appropriate action levels for contaminant monitoring to ensure protection of human health.

  1. Elastic anisotropy of core samples from the Taiwan Chelungpu Fault Drilling Project (TCDP): direct 3-D measurements and weak anisotropy approximations

    Science.gov (United States)

    Louis, Laurent; David, Christian; Špaček, Petr; Wong, Teng-Fong; Fortin, Jérôme; Song, Sheng Rong

    2012-01-01

    The study of seismic anisotropy has become a powerful tool to decipher rock physics attributes in reservoirs or in complex tectonic settings. We compare direct 3-D measurements of P-wave velocity in 132 different directions on spherical rock samples to the prediction of the approximate model proposed by Louis et al. based on a tensorial approach. The data set includes measurements on dry spheres under confining pressure ranging from 5 to 200 MPa for three sandstones retrieved at a depth of 850, 1365 and 1394 metres in TCDP hole A (Taiwan Chelungpu Fault Drilling Project). As long as the P-wave velocity anisotropy is weak, we show that the predictions of the approximate model are in good agreement with the measurements. As the tensorial method is designed to work with cylindrical samples cored in three orthogonal directions, a significant gain both in the number of measurements involved and in sample preparation is achieved compared to measurements on spheres. We analysed the pressure dependence of the velocity field and show that as the confining pressure is raised the velocity increases, the anisotropy decreases but remains significant even at high pressure, and the shape of the ellipsoid representing the velocity (or elastic) fabric evolves from elongated to planar. These observations can be accounted for by considering the existence of both isotropic and anisotropic crack distributions and their evolution with applied pressure.

  2. Effects of drilling fluids on marine organisms

    International Nuclear Information System (INIS)

    Parrish, P.R.; Duke, T.W.

    1990-01-01

    This paper reports on drilling fluids, also called drilling muds, which are essential to drilling processes in the exploration and production of oil and gas from the U.S. Outer Continental Shelf (OCS). These fluids are usually discharged from drilling platforms into surrounding waters of the OCS and are regulated by the U.S. Environmental Protection Agency (EPA). In a program carried out by the EPA Environmental research Laboratory at Gulf Breeze, Florida, diverse marine species as well as microbiotic and macrobiotic communities were studied. Drilling fluids were toxic to marine organisms in certain concentrations and exposure regimes. Furthermore, the fluids adversely affected the benthos physically by burying them or by altering the substrates. Toxicity of the drilling-fluid components, used drilling fluids from active Gulf of Mexico sites, and laboratory-prepared drilling fluids varied considerably. for example 96-h LC 50 s were from 25 μ liter -1 to > 1500 μl liter -1 for clams, larval lobsters, mysids, and grass shrimp. In most instances, mortality was significantly (α = 0.05) correlated with the diesel-oil content of the fluids collected from the Gulf of Mexico. Data and model simulations suggest a rapid dilution of drilling fluids released into OCS waters, resulting in concentrations below the acute-effect concentration for the water column organisms tested

  3. A cross-taxa study using environmental DNA/RNA metabarcoding to measure biological impacts of offshore oil and gas drilling and production operations

    KAUST Repository

    Laroche, Olivier

    2017-12-01

    Standardized ecosystem-based monitoring surveys are critical for providing information on marine ecosystem health. Environmental DNA/RNA (eDNA/eRNA) metabarcoding may facilitate such surveys by quickly and effectively characterizing multi-trophic levels. In this study, we assessed the suitability of eDNA/eRNA metabarcoding to evaluate changes in benthic assemblages of bacteria, Foraminifera and other eukaryotes along transects at three offshore oil and gas (O&G) drilling and production sites, and compared these to morphologically characterized macro-faunal assemblages. Bacterial communities were the most responsive to O&G activities, followed by Foraminifera, and macro-fauna (the latter assessed by morphology). The molecular approach enabled detection of hydrocarbon degrading taxa such as the bacteria Alcanivorax and Microbulbifer at petroleum impacted stations. Most identified indicator taxa, notably among macro-fauna, were highly specific to site conditions. Based on our results we suggest that eDNA/eRNA metabarcoding can be used as a stand-alone method for biodiversity assessment or as a complement to morphology-based monitoring approaches.

  4. A cross-taxa study using environmental DNA/RNA metabarcoding to measure biological impacts of offshore oil and gas drilling and production operations

    KAUST Repository

    Laroche, Olivier; Wood, Susanna A.; Tremblay, Louis A.; Ellis, Joanne; Lear, Gavin; Pochon, Xavier

    2017-01-01

    Standardized ecosystem-based monitoring surveys are critical for providing information on marine ecosystem health. Environmental DNA/RNA (eDNA/eRNA) metabarcoding may facilitate such surveys by quickly and effectively characterizing multi-trophic levels. In this study, we assessed the suitability of eDNA/eRNA metabarcoding to evaluate changes in benthic assemblages of bacteria, Foraminifera and other eukaryotes along transects at three offshore oil and gas (O&G) drilling and production sites, and compared these to morphologically characterized macro-faunal assemblages. Bacterial communities were the most responsive to O&G activities, followed by Foraminifera, and macro-fauna (the latter assessed by morphology). The molecular approach enabled detection of hydrocarbon degrading taxa such as the bacteria Alcanivorax and Microbulbifer at petroleum impacted stations. Most identified indicator taxa, notably among macro-fauna, were highly specific to site conditions. Based on our results we suggest that eDNA/eRNA metabarcoding can be used as a stand-alone method for biodiversity assessment or as a complement to morphology-based monitoring approaches.

  5. The Industrial Toxics Project: Targeting chemicals for environmental results

    International Nuclear Information System (INIS)

    Burch, W.M.

    1991-01-01

    In September, 1990, the Administrator of the US Environmental Protection Agency committed the Agency to a program of targeting chemicals for multi-media risk reduction activities through pollution prevention. The Industrial Toxics Project will place emphasis on obtaining voluntary commitments from industry to reduce releases of toxic chemicals to the air, water, and land with a goal of reducing releases nationwide by 33% by 1992 and 50% by 1995. An initial list of 18 chemicals have been selected based on recommendations from each Agency program. The chemicals selected are subject to reporting under the Toxic Chemical Release Inventory Program which will provide the basis for tracking progress. The chemicals are characterized by high production volume, toxicity and releases and present the potential for significant risk reduction through pollution prevention. This presentation will discuss the focus and direction of this new initiative

  6. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    1995-01-01

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out

  7. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  8. Environmental Management Integration Project/Mixed Waste Focus Area Partnership

    International Nuclear Information System (INIS)

    Gombert, D.; Kristofferson, K.; Cole, L.

    1999-01-01

    On January 16, 1998, the Assistant Secretary for the Environmental Management (EM) Program at the Department of Energy, issued DOE-Idaho the Program Integration and Systems Engineering Guidance for Fiscal Year 1998, herein called Guidance, which directed that program integration tasks be performed for all EM program areas. This guidance directed the EM Integration team, as part of the Task 1, to develop baseline waste and material disposition maps which are owned by the site Project Baseline Summary (PBS) manager. With these baselines in place Task 2 gave direction to link Science and Technology activities to the waste and material stream supported by that technology. This linkage of EM Program needs with the OST activities supports the DOE goal of maximizing cleanup at DOE sites by 2006 and provides a defensible science and technology program. Additionally, this linkage is a valuable tool in the integration of the waste and material disposition efforts for the DOE complex

  9. The Swedish Deep Drilling Program - an emerging scientific drilling program and new infrastructure.

    Science.gov (United States)

    Lorenz, Henning; Juhlin, Christopher

    2010-05-01

    Scientific drilling projects imply numerous aspects that are difficult to handle for individual research groups. Therefore, about three years ago a joint effort was launched in the Swedish geoscientific community to establish a national program for scientific drilling, the Swedish Deep Drilling Program (SDDP). Soon afterwards, several working groups established drilling proposals with Nordic and, also, international participation. With this serious interest in scientific drilling SDDP was able to successfully promote the Swedish membership in ICDP which commenced in 2008. Two SDDP projects achieved workshop grants from the International Continental Scientific Drilling Program (ICDP) in 2009. In the same year the Swedish Research Council decided to support an application for a truck-mounted drill rig - a big success for the SDDP working group. Scientific Drilling infrastructure: SDDP envisages a mobile platform that is capable of core drilling to at least 2500 m depth. The procurement will be made during 2010 and first operations are planned for 2011. This drill rig is primarily intended for use in the SDDP drilling projects, but will be rented out to other scientific drilling projects or even commercial enterprises in the remaining time to cover maintenance and future upgrade costs. SDDP's drill rig will be unique in Europe and complementary to the deep drilling InnovaRig of the GFZ German Research Centre for Geosciences. Until now, drilling to 2000 - 3000 m implied the use of a full-sized drill rig like the InnovaRig or the mobilization of a core drill rig from another continent. This gap will now be filled by Sweden's upcoming scientific drilling infrastructure. Drilling projects and proposals: Presently, SDDP serves six projects: "Collisional Orogeny in the Scandinavian Caledonides" (COSC; ICDP workshop spring 2010), the "Postglacial Fault Drilling Project" (PFDP; ICDP workshop autumn 2010), a "Deep Rock Laboratory" (DRL), "Palaeoproterozoic Mineralized Volcanic

  10. CASING DRILLING TECHNOLOGY

    Directory of Open Access Journals (Sweden)

    Nediljka Gaurina-Međimurec

    2005-12-01

    Full Text Available Casing drilling is an alternative option to conventional drilling and uses standard oilfield casing instead of drillstring. This technology is one of the greatest developments in drilling operations. Casing drilling involves drilling and casing a well simultaneously. In casing driling process, downhole tools can be retrieved, through the casing on wire-line, meaning tool recovery or replacement of tools can take minutes versus hours under conventional methods. This process employs wireline-retrievable tools and a drill-lock assembly, permitting bit and BHA changes, coring, electrical logging and even directional or horizontal drilling. Once the casing point is reached, the casing is cemented in place without tripping pipe.

  11. Drilling to investigate processes in active tectonics and magmatism

    Science.gov (United States)

    Shervais, J.; Evans, J.; Toy, V.; Kirkpatrick, J.; Clarke, A.; Eichelberger, J.

    2014-12-01

    Coordinated drilling efforts are an important method to investigate active tectonics and magmatic processes related to faults and volcanoes. The US National Science Foundation (NSF) recently sponsored a series of workshops to define the nature of future continental drilling efforts. As part of this series, we convened a workshop to explore how continental scientific drilling can be used to better understand active tectonic and magmatic processes. The workshop, held in Park City, Utah, in May 2013, was attended by 41 investigators from seven countries. Participants were asked to define compelling scientific justifications for examining problems that can be addressed by coordinated programs of continental scientific drilling and related site investigations. They were also asked to evaluate a wide range of proposed drilling projects, based on white papers submitted prior to the workshop. Participants working on faults and fault zone processes highlighted two overarching topics with exciting potential for future scientific drilling research: (1) the seismic cycle and (2) the mechanics and architecture of fault zones. Recommended projects target fundamental mechanical processes and controls on faulting, and range from induced earthquakes and earthquake initiation to investigations of detachment fault mechanics and fluid flow in fault zones. Participants working on active volcanism identified five themes: the volcano eruption cycle; eruption sustainability, near-field stresses, and system recovery; eruption hazards; verification of geophysical models; and interactions with other Earth systems. Recommended projects address problems that are transferrable to other volcanic systems, such as improved methods for identifying eruption history and constraining the rheological structure of shallow caldera regions. Participants working on chemical geodynamics identified four major themes: large igneous provinces (LIPs), ocean islands, continental hotspot tracks and rifts, and

  12. Communication and Stakeholder Involvement in Environmental Remediation Projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-05-15

    The way in which members of the public perceive a contamination situation and an approach to the remediation of contaminated land will influence the decision making process in a variety of ways. Through communication between experts, decision makers and members of stakeholder communities, participatory processes and negotiation between different interest groups can sometimes be used effectively as mechanisms for improving the overall decision making process. The intention is to ensure a technically sound and socially acceptable decision that meets norms of adequacy or satisfactory performance in relation to a whole range of different concerns. Good communication strategies will encourage cooperation and understanding between different interested parties in remediation projects. Involvement of affected or interested persons can prevent fear driven reactions, which potentially damage public response and create undue expectations or unnecessary anxiety. For all environmental remediation (ER) cases, there is a risk that the process will fail if it does not respect social, environmental, political and economic dimensions. This requires open, clear and mutually agreed lines of communication among stakeholders within a well defined legal framework. A general recommendation is to involve them from a very early point in the process. This publication presents ER in plain language in such a way that implementers and regulators can communicate the motives and objectives of remediation projects to a variety of stakeholder communities in order to improve mutual understanding and facilitate dialogue between interested parties. ER is considered from two perspectives: technical and non-technical. A section that gives general ideas on the strategies to deal with stakeholder involvement and which discusses different aspects of the communication approaches in ER is then included. It is recognized that social, cultural and political situations are very diverse in different countries in

  13. Communication and Stakeholder Involvement in Environmental Remediation Projects

    International Nuclear Information System (INIS)

    2014-01-01

    The way in which members of the public perceive a contamination situation and an approach to the remediation of contaminated land will influence the decision making process in a variety of ways. Through communication between experts, decision makers and members of stakeholder communities, participatory processes and negotiation between different interest groups can sometimes be used effectively as mechanisms for improving the overall decision making process. The intention is to ensure a technically sound and socially acceptable decision that meets norms of adequacy or satisfactory performance in relation to a whole range of different concerns. Good communication strategies will encourage cooperation and understanding between different interested parties in remediation projects. Involvement of affected or interested persons can prevent fear driven reactions, which potentially damage public response and create undue expectations or unnecessary anxiety. For all environmental remediation (ER) cases, there is a risk that the process will fail if it does not respect social, environmental, political and economic dimensions. This requires open, clear and mutually agreed lines of communication among stakeholders within a well defined legal framework. A general recommendation is to involve them from a very early point in the process. This publication presents ER in plain language in such a way that implementers and regulators can communicate the motives and objectives of remediation projects to a variety of stakeholder communities in order to improve mutual understanding and facilitate dialogue between interested parties. ER is considered from two perspectives: technical and non-technical. A section that gives general ideas on the strategies to deal with stakeholder involvement and which discusses different aspects of the communication approaches in ER is then included. It is recognized that social, cultural and political situations are very diverse in different countries in

  14. Final Environmental Impact Statement to construct and operate the Crownpoint Uranium Solution Mining Project, Crownpoint, New Mexico

    International Nuclear Information System (INIS)

    1997-02-01

    This Final Environmental Impact Statement (FEIS) addresses the proposed action of issuing a combined source and 11e(2) byproduct material license and minerals operating leases for Federal and Indian lands to Hydro Resources, Inc. (HRI). This action would authorize HRI to conduct in-situ leach uranium mining in McKinley County, New Mexico. Such mining would involve drilling wells to access the ore bodies, then recirculating groundwater with added oxygen to mobilize uranium found in the ore. Uranium would then be removed from the solution using ion exchange technology in processing plants located at three separate sites. As proposed by HRI, a central plant would provide drying and packaging equipment for the entire project. The Draft Environmental Impact Statement (DEIS) for the proposed action was prepared by an interagency review group comprising staff from the Nuclear Regulatory Commission, the Bureau of Indian Affairs, and the Bureau of Land Management, and published in October 1994. After evaluating the environmental impacts of the proposed action in the DEIS, the reviewing agencies concluded that the appropriate action was to issue the requested license and proposed leases authorizing HRI to proceed with the project. This FEIS reevaluates the proposed licensing action on the basis of written and oral comments received on the DEIS and on additional information obtained in 1995 and 1996. The FEIS describes and evaluates (1) the purpose of and need for the proposed action, (2) alternatives to the proposed action, (3) the environmental resources that could be affected by the proposed action and alternatives, (4) the potential environmental consequences of the proposed action and alternatives, and (5) the economic costs and benefits associated with the proposed action. Based on this assessment, the FEIS makes recommendations concerning the requested license and proposed leases

  15. Structural Characterization of the Foliated-Layered Gabbro Transition in Wadi Tayin of the Samail Ophiolite, Oman; Oman Drilling Project Holes GT1A and GT2A

    Science.gov (United States)

    Deans, J. R.; Crispini, L.; Cheadle, M. J.; Harris, M.; Kelemen, P. B.; Teagle, D. A. H.; Matter, J. M.; Takazawa, E.; Coggon, J. A.

    2017-12-01

    Oman Drilling Project Holes GT1A and GT2A were drilled into the Wadi Tayin massif, Samail ophiolite and both recovered ca. 400 m of continuous core through a section of the layered gabbros and the foliated-layered gabbro transition. Hole GT1A is cut by a discrete fault system including localized thin ultracataclastic fault zones. Hole GT2A is cut by a wider zone of brittle deformation and incipient brecciation. Here we report the structural history of the gabbros reflecting formation at the ridge to later obduction. Magmatic and high temperature history- 1) Both cores exhibit a pervasive, commonly well-defined magmatic foliation delineated by plagioclase, olivine and in places clinopyroxene. Minor magmatic deformation is present. 2) The dip of the magmatic foliation varies cyclically, gradually changing dip by 30o from gentle to moderate over a 50 m wavelength. 3) Layering is present throughout both cores, is defined by changes in mode and grain size ranging in thickness from 2 cm to 3 m and is commonly sub-parallel to the foliation. 4) There are no high temperature crystal-plastic shear zones in the core. Key observations include: no simple, systematic shallowing of dip with depth across the foliated-layered gabbro transition and layering is continuous across this transition. Cyclic variation of magmatic foliation dip most likely reflects the process of plate separation at the ridge axis. Near-axis faulting- i) On or near-axis structures consist of epidote-amphibole bearing hydraulic breccias and some zones of intense cataclasis with intensely deformed epidote and seams of clay and chlorite accompanied by syntectonic alteration of the wall rock. Early veins are filled with amphibole, chlorite, epidote, and anhydrite. ii) The deformation ranges from brittle-ductile, causing local deflection of the magmatic foliation, to brittle offset of the foliation and core and mantle structures in anhydrite veins. iii) The prevalent sense of shear is normal and slickenfibers

  16. CFPL installs products pipeline with directional drilling

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    Central Florida Pipeline Company (CFPL), a subsidiary of GATX Terminals Corp., Tampa, FL, has used directional drilling under seven water bodies in Hillsborough, Polk and Osceola Counties in constructing its new pipeline from Tampa to Orlando. Primary reason for using directional drilling is to protect the environment by minimizing water turbidity while the 16-inch diameter, 109-mile refined petroleum products pipeline is being installed. Total cost of the project is pegged at $68.5 million. Directional drilling enabled the pipe to be placed about 20 feet below the bottom of: The Alafia River in Riverview with 999 feet drilled; Port Sutton Channel near the Port of Tampa with 2,756 feet drilled; Reedy Creek Swamp at the intersection of Interstate 4 and Highway 192 which had 1,111 feet drilled; Wetland number-sign 70 southwest of Lake Wales with 1,575 feet drilled; Peace River south of Bartow had 2,470 feet drilled; Bonnet Creek west of Kissimmee had 693 feet drilled. Shingle Creek near the borders of Osceola and Orange Counties with 1,700 feet drilled. This paper reviews the design plans for construction and the emergency response plans should a rupture occur in the line

  17. Advanced Drilling through Diagnostics-White-Drilling

    International Nuclear Information System (INIS)

    FINGER, JOHN T.; GLOWKA, DAVID ANTHONY; LIVESAY, BILLY JOE; MANSURE, ARTHUR J.; PRAIRIE, MICHAEL R.

    1999-01-01

    A high-speed data link that would provide dramatically faster communication from downhole instruments to the surface and back again has the potential to revolutionize deep drilling for geothermal resources through Diagnostics-While-Drilling (DWD). Many aspects of the drilling process would significantly improve if downhole and surface data were acquired and processed in real-time at the surface, and used to guide the drilling operation. Such a closed-loop, driller-in-the-loop DWD system, would complete the loop between information and control, and greatly improve the performance of drilling systems. The main focus of this program is to demonstrate the value of real-time data for improving drilling. While high-rate transfer of down-hole data to the surface has been accomplished before, insufficient emphasis has been placed on utilization of the data to tune the drilling process to demonstrate the true merit of the concept. Consequently, there has been a lack of incentive on the part of industry to develop a simple, low-cost, effective high-speed data link. Demonstration of the benefits of DWD based on a high-speed data link will convince the drilling industry and stimulate the flow of private resources into the development of an economical high-speed data link for geothermal drilling applications. Such a downhole communication system would then make possible the development of surface data acquisition and expert systems that would greatly enhance drilling operations. Further, it would foster the development of downhole equipment that could be controlled from the surface to improve hole trajectory and drilling performance. Real-time data that would benefit drilling performance include: bit accelerations for use in controlling bit bounce and improving rock penetration rates and bit life; downhole fluid pressures for use in the management of drilling hydraulics and improved diagnosis of lost circulation and gas kicks; hole trajectory for use in reducing directional

  18. Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska

    International Nuclear Information System (INIS)

    1998-05-01

    The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact

  19. Remediation activities at the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    Walsh, T.J.; Danner, R.

    1996-01-01

    The Fernald Environmental Management Project (FEMP) is a United States Department of Energy (DOE) facility located in southwestern Ohio. The facility began manufacturing uranium products in the early 1950's and continued processing uranium ore concentrates until 1989. The facility used a variety of chemical and metallurgical processes to produce uranium metals for use at other DOE sites across the country. Since the facility manufactured uranium metals for over thirty years, various amounts of radiological contamination exists at the site. Because of the chemical and metallurgical processes employed at the site, some hazardous wastes as defined by the Resource Conservation and Recovery Act (RCRA) were also generated at the site. In 1989. the FEMP was placed on the National Priorities List (NPL) requiring cleanup of the facility's radioactive and chemical contamination under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This paper discusses the proposed remediation activities at the five Operable Units (OUs) designated at the FEMP. In addition, the paper also examines the ongoing CERCLA response actions and RCRA closure activities at the facility

  20. Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact.

  1. Nuclear criticality safety program for environmental restoration projects

    International Nuclear Information System (INIS)

    Marble, R.C.; Brown, T.D.

    1994-05-01

    The Fernald Environmental Management Project (FEMP), formerly known as the Feed Materials Production Center (FMPC), is located on a 1050 acre site approximately twenty miles northwest of Cincinnati, Ohio. The production area of the site covers approximately 136 acres in the central portion of the site. Surrounding the core production area is a buffer consisting of leased grazing land, reforested land, and unused areas. The uranium processing facility was designed and constructed in the early 1950s. During the period from 1952 to 1989 the site produced uranium feed material and uranium products used in the United States weapons complex. Production at the site ended in 1989, when the site was shut down for what was expected to be a short period of time. However, the FUTC was permanently shut down in 1991, and the site's mission was changed from production to environmental restoration. The objective of this paper is to give an update on activities at the Fernald Site and to describe the Nuclear Criticality Safety issues that are currently being addressed

  2. Environmental impacts of the extraction of forestry residues. Project report

    Energy Technology Data Exchange (ETDEWEB)

    Brierley, E.; Truckell, I.; Brewer, T.; Towers, W.; Malcolm, A.; Walker, W.

    2004-07-01

    The environmental implications of the changes in forestry operations and practices necessary to remove significant quantities of forest residues for use as a fuel were investigated in this study commissioned by the UK Department of Trade and Industry. The project involved: a review of current practices for the treatment of residues and the production of wood fuels in Great Britain; an assessment of the impact of these practices on soils, landscape, water, flora, fauna and air; and the modelling of scenarios to identify the quantity of forestry land from which residues could be obtained to help meet UK targets for the use of renewable energy. This allowed an assessment of how practices may develop and how environmental impacts may change as a result of increased removal of forestry residues. The study included a literature review, discussions with the forestry and biomass industries and the selection of case study areas with a range of soil types. Differences in opportunities for residue harvesting between upland forestry in the north and west of the UK and lowland forestry in the south of the UK were highlighted by the model outputs.

  3. Environmental assessment -- Proposed neutrino beams at the Main Injector project

    International Nuclear Information System (INIS)

    1997-12-01

    The US Department of Energy (DOE) proposes to build a beamline on the Fermi National Accelerator Laboratory (Fermilab) site to accommodate an experimental research program in neutrino physics. The proposed action, called Neutrino Beams at the Main Injector (NuMI), is to design, construct, operate and decommission a facility for producing and studying a high flux beam of neutrinos in the energy range of 1 to 40 GeV (1 GeV is one billion or 10 9 electron volts). The proposed facility would initially be dedicated to two experiments, COSMOS (Cosmologically Significant Mass Oscillations) and MINOS (Main Injector Neutrino Oscillation Search). The neutrino beam would pass underground from Fermilab to northern Minnesota. A tunnel would not be built in this intervening region because the neutrinos easily pass through the earth, not interacting, similar to the way that light passes through a pane of glass. The beam is pointed towards the MINOS detector in the Soudan Underground Laboratory in Minnesota. Thus, the proposed project also includes construction, operation and decommissioning of the facility located in the Soudan Underground Laboratory in Minnesota that houses this MINOS detector. This environmental assessment (EA) has been prepared by the US Department of Energy (DOE) in accordance with the DOE's National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021). This EA documents DOE's evaluation of potential environmental impacts associated with the proposed construction and operation of NuMI at Fermilab and its far detector facility located in the Soudan Underground Laboratory in Minnesota. Any future use of the facilities on the Fermilab site would require the administrative approval of the Director of Fermilab and would undergo a separate NEPA review. Fermilab is a Federal high-energy physics research laboratory in Batavia, Illinois operated on behalf of the DOE by Universities Research Association, Inc

  4. Environmental assessment -- Proposed neutrino beams at the Main Injector project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The US Department of Energy (DOE) proposes to build a beamline on the Fermi National Accelerator Laboratory (Fermilab) site to accommodate an experimental research program in neutrino physics. The proposed action, called Neutrino Beams at the Main Injector (NuMI), is to design, construct, operate and decommission a facility for producing and studying a high flux beam of neutrinos in the energy range of 1 to 40 GeV (1 GeV is one billion or 10{sup 9} electron volts). The proposed facility would initially be dedicated to two experiments, COSMOS (Cosmologically Significant Mass Oscillations) and MINOS (Main Injector Neutrino Oscillation Search). The neutrino beam would pass underground from Fermilab to northern Minnesota. A tunnel would not be built in this intervening region because the neutrinos easily pass through the earth, not interacting, similar to the way that light passes through a pane of glass. The beam is pointed towards the MINOS detector in the Soudan Underground Laboratory in Minnesota. Thus, the proposed project also includes construction, operation and decommissioning of the facility located in the Soudan Underground Laboratory in Minnesota that houses this MINOS detector. This environmental assessment (EA) has been prepared by the US Department of Energy (DOE) in accordance with the DOE`s National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021). This EA documents DOE`s evaluation of potential environmental impacts associated with the proposed construction and operation of NuMI at Fermilab and its far detector facility located in the Soudan Underground Laboratory in Minnesota. Any future use of the facilities on the Fermilab site would require the administrative approval of the Director of Fermilab and would undergo a separate NEPA review. Fermilab is a Federal high-energy physics research laboratory in Batavia, Illinois operated on behalf of the DOE by Universities Research Association, Inc.

  5. Yakima fisheries project. Revised draft environmental impact statement

    International Nuclear Information System (INIS)

    1995-05-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council's (Council's) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA's proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities (adaptive management); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery. Only minor differences in environmental consequences were found between Alternatives 1 and 2. Potentially high impacts on wild, native, and non-target fish populations under both alternatives would be mitigated through careful adherence to the adaptive management process outlined in the EIS

  6. Environmental Field Surveys, EMF Rapid Program, Engineering Project No.3

    Energy Technology Data Exchange (ETDEWEB)

    Enertech Consultants

    1996-04-01

    The EMF Research and Public Information Dissemination Program (RAPID) includes several engineering research in the area of exposure assessment and source characterization. RAPID engineering project No. 3: ''Environmental Field Surveys'' was performed to obtain information on the levels and characteristics of different environments, for which only limited data were available, especially in comparison to magnetic field data for the residential environment and for electric utility facilities, such as power lines and substations. This project was also to provide information on the contribution of various field sources in the surveyed environments. Magnetic field surveys were performed at four sites for each of five environments: schools, hospitals, office buildings, machine shops, and grocery stores. Of the twenty sites surveyed, 11 were located in the San Francisco Bay Area and 9 in Massachusetts. The surveys used a protocol based on magnetic field measurements and observation of activity patterns, designed to provide estimates of magnetic field exposure by type of people and by type of sources. The magnetic field surveys conducted by this project produced a large amount of data which will form a part of the EMF measurement database Field and exposure data were obtained separately for ''area exposure'' and ''at exposure points''. An exposure point is a location where persons engage in fixed, site specific activities near a local source that creates a significant increase in the area field. The area field is produced by ''area sources'', whose location and field distribution is in general not related to the location of the people in the area.

  7. High Temperature 300°C Directional Drilling System

    Energy Technology Data Exchange (ETDEWEB)

    Chatterjee, Kamalesh [Baker Hughes Oilfield Operations, Houston, TX (United States); Aaron, Dick [Baker Hughes Oilfield Operations, Houston, TX (United States); Macpherson, John [Baker Hughes Oilfield Operations, Houston, TX (United States)

    2015-07-31

    Many countries around the world, including the USA, have untapped geothermal energy potential. Enhanced Geothermal Systems (EGS) technology is needed to economically utilize this resource. Temperatures in some EGS reservoirs can exceed 300°C. To effectively utilize EGS resources, an array of injector and production wells must be accurately placed in the formation fracture network. This requires a high temperature directional drilling system. Most commercial services for directional drilling systems are rated for 175°C while geothermal wells require operation at much higher temperatures. Two U.S. Department of Energy (DOE) Geothermal Technologies Program (GTP) projects have been initiated to develop a 300°C capable directional drilling system, the first developing a drill bit, directional motor, and drilling fluid, and the second adding navigation and telemetry systems. This report is for the first project, “High Temperature 300°C Directional Drilling System, including drill bit, directional motor and drilling fluid, for enhanced geothermal systems,” award number DE-EE0002782. The drilling system consists of a drill bit, a directional motor, and drilling fluid. The DOE deliverables are three prototype drilling systems. We have developed three drilling motors; we have developed four roller-cone and five Kymera® bits; and finally, we have developed a 300°C stable drilling fluid, along with a lubricant additive for the metal-to-metal motor. Metal-to-metal directional motors require coatings to the rotor and stator for wear and corrosion resistance, and this coating research has been a significant part of the project. The drill bits performed well in the drill bit simulator test, and the complete drilling system has been tested drilling granite at Baker Hughes’ Experimental Test Facility in Oklahoma. The metal-to-metal motor was additionally subjected to a flow loop test in Baker Hughes’ Celle Technology Center in Germany, where it ran for more than 100

  8. The Environmental Trilogy project: Balancing technical, institutional, and cultural perspectives to environmental management

    International Nuclear Information System (INIS)

    Kurstedt, Pamela S.; Jim, Russell; Wadsworth, Bonnie C.W.; Burke, William H.; Kurstedt, Harold A. Jr.

    1992-01-01

    'The significant problems we face cannot be solved at the same level of thinking we were at when we created them.' Albert Einstein. I've identified an initial set of three perspectives important to building an integrated, comprehensive approach to managing the environment - technical, institutional, and cultural. I've constructed an holistic model (called the Environmental Trilogy) for environmental management, encompassing at least these three perspectives and their interrelationships. In this paper, I outline the model and report the results of a working session facilitated at Virginia Tech in Blacksburg, Virginia, in October 1991, involving three representatives from each of the technical, institutional, and cultural perspectives. The institutional members of this group were people who understand institutional effects, rather than those who represent institutions. The working group discussed and analyzed the technical-institutional, technical-cultural, and institutional-cultural inter- relationships of the environmental trilogy. The goals of the working group were to put structure on the environmental trilogy model, to facilitate the definition of variables, and explore relationships between and among variables. The working group members are to continue studying issues and components, perspectives, connections, and cause-and-effect in the models and report back to interested parties. The outcome is projected to be a more holistic, integrated view of the environment. (author)

  9. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Science.gov (United States)

    2013-06-13

    ... Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project and Intention To Hold Public Meetings In accordance with the National Environmental Policy... the Martin Dam Hydroelectric Project (FERC No. 349), located on the Tallapoosa River in Tallapoosa...

  10. Bayesian spatial modeling applied to environmental monitoring due to the use of different drilling fluids in the maritime exploration activity; Modelagem espacial Bayesiana aplicada ao monitoramento ambiental decorrente do uso de diferentes fluidos de perfuracao na atividade exploratoria maritima

    Energy Technology Data Exchange (ETDEWEB)

    Pulgati, Fernando H. [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE). Lab. de Modelagem de Bacias (LAB2M); Zouain, Ricardo N.A. [Universidade Federal do Rio Grande do Sul (UFRGS), Porto Alegre, RS (Brazil). Inst. de Geociencias. Centro de Estudos de Geologia Costeira e Oceanica; Fachel, Jandyra M.G. [Universidade Federal do Rio Grande do Sul (UFRGS), Porto Alegre, RS (Brazil). Inst. de Matematica; Landau, Luiz [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE). Lab. de Metodos Computacionais em Engenharia (LAMCE)

    2004-07-01

    Controlling and monitoring environmental researches have accompanied the development of offshore exploration drill activities aimed at finding oil and gas reserves, as there has been an increase in the environmental demands and restrictions. Three stages of the drilling process were isolated and the effects of different fluids were measured using Bayesian spatial models. The probable impact of the use of non-aqueous fluid (NAF) was measured through changes observed in sea sediments in three different occasions: previous to the activity, one (1) month after the end of the activity, and one (1) year after the end of the activity. BACI (Before-After Control Impact) design, which allows the control of temporal and spatial variation components, was chosen. (author)

  11. Environmental assessment of the Environmental Restoration Project at Sandia National Laboratories/New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Sandia National Laboratories/New Mexico (SNL/NM) is managed and operated for the U.S. Department of Energy (DOE) by Sandia Corporation, a subsidiary of the Lockheed Martin Company. SNL/NM is located on land controlled by DOE within the boundaries of Kirtland Air Force Base (KAFB) in Albuquerque, New Mexico. The major responsibilities of SNL/NM are the support of national security and energy projects. This report provides an environmental assessment of proposed remedial action activities at the solid waste management units at SNL/NM. A risk assessment of health hazards is also discussed.

  12. ResonantSonic drilling. Innovative technology summary report

    International Nuclear Information System (INIS)

    1995-04-01

    The technology of ResonantSonic drilling is described. This technique has been demonstrated and deployed as an innovative tool to access the subsurface for installation of monitoring and/or remediation wells and for collection of subsurface materials for environmental restoration applications. The technology uses no drilling fluids, is safe and can be used to drill slant holes

  13. Environmental assessment: Raft River geothermal project pilot plant, Cassia County, Idaho

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    The action assessed here is the construction and operation of a 5- to 6-MW(e) (gross) geothermal pilot plant in the Raft River Valley of southern Idaho. This project was originally planned as a thermal test loop using a turbine simulator valve. The test loop facility (without the simulator valve) is now under construction. The current environmental assessment addresses the complete system including the addition of a turbine-generator and its associated switching gear in place of the simulator valve. The addition of the turbine-generator will result in a net production of 2.5 to 3.5 MW(e) with a commensurate reduction in waste heat to the cooling tower and will require the upgrading of existing transmission lines for offsite delivery of generated power. Construction of the facility will require disturbance of approximately 20 ha (50 acres) for the facility itself and approximately 22.5 ha (57 acres) for construction of drilling pads and ponds, pipelines, and roads. Existing transmission lines will be upgraded for the utility system interface. Interference with alternate land uses will be minimal. Loss of wildlife habitat will be acceptable, and US Fish and Wildlife Service recommendations for protection of raptor nesting sites, riparian vegetation, and other important habitats will be observed. During construction, noise levels may reach 100 dBA at 15 m (50 ft) from well sites, but wildlife and local residents should not be significantly affected if extended construction is not carried out within 0.5 km (0.3 miles) of residences or sensitive wildlife habitat. Water use during construction will not be large and impacts on competing uses are unlikely.

  14. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  15. An outline of the application of an environmental management system to the PRAMU (Uranium Mining Environmental Restitution Project)

    International Nuclear Information System (INIS)

    Smetniansky de De Grande, Nelida; Avila Cadena, Guadalberto; Cardozo, Damian

    2000-01-01

    In Argentina the National Atomic Energy Commission (CNEA) has the responsibility to restore uranium mining facilities, when milling operations have been shut down. To carry out this clean up actions CNEA created the Project for Uranium Mining Environmental Restoration (PRAMU in Spanish). To take into account the environmental aspects of the restoration activities, the PRAMU includes in its management an Environmental Management System (SGA in Spanish), which is of central importance in determining the environmental policy, objectives and targets. In this work a general view of the Environmental Management System is presented and an example of one of the environmental programs to be implemented is detailed. (author)

  16. RESULTS FROM THE (1) DATA COLLECTION WORKSHOP, (2) MODELING WORKSHOP AND (3) DRILLING AND CORING METHODS WORKSHOP AS PART OF THE JOINT INDUSTRY PARTICIPATION (JIP) PROJECT TO CHARACTERIZE NATURAL GAS HYDRATES IN THE DEEPWATER GULF OF MEXICO

    Energy Technology Data Exchange (ETDEWEB)

    Stephen A. Holditch; Emrys Jones

    2002-09-01

    In 2000, Chevron began a project to learn how to characterize the natural gas hydrate deposits in the deepwater portions of the Gulf of Mexico. A Joint Industry Participation (JIP) group was formed in 2001, and a project partially funded by the U.S. Department of Energy (DOE) began in October 2001. The primary objective of this project is to develop technology and data to assist in the characterization of naturally occurring gas hydrates in the deepwater Gulf of Mexico. These naturally occurring gas hydrates can cause problems relating to drilling and production of oil and gas, as well as building and operating pipelines. Other objectives of this project are to better understand how natural gas hydrates can affect seafloor stability, to gather data that can be used to study climate change, and to determine how the results of this project can be used to assess if and how gas hydrates act as a trapping mechanism for shallow oil or gas reservoirs. As part of the project, three workshops were held. The first was a data collection workshop, held in Houston during March 14-15, 2002. The purpose of this workshop was to find out what data exist on gas hydrates and to begin making that data available to the JIP. The second and third workshop, on Geoscience and Reservoir Modeling, and Drilling and Coring Methods, respectively, were held simultaneously in Houston during May 9-10, 2002. The Modeling Workshop was conducted to find out what data the various engineers, scientists and geoscientists want the JIP to collect in both the field and the laboratory. The Drilling and Coring workshop was to begin making plans on how we can collect the data required by the project's principal investigators.

  17. Preoperational Environmental Survey for the Spent Nuclear Fuel (SNF) Project Facilities

    International Nuclear Information System (INIS)

    MITCHELL, R.M.

    2000-01-01

    This document represents the report for environmental sampling of soil, vegetation, litter, cryptograms, and small mammals at the Spent Nuclear Fuel Project facilities located in 100 K and 200 East Areas in support of the preoperational environmental survey

  18. Preoperational Environmental Survey for the Spent Nuclear Fuel (SNF) Project Facilities

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.M.

    2000-10-12

    This document represents the report for environmental sampling of soil, vegetation, litter, cryptograms, and small mammals at the Spent Nuclear Fuel Project facilities located in 100 K and 200 East Areas in support of the preoperational environmental survey.

  19. Radioactive environmental impact assessment for a highway construction project in Guangdong province

    International Nuclear Information System (INIS)

    Qiu Guohua

    2009-01-01

    Based on the field environmental investigation and monitoring result, the radioactive environmental impact for a highway construction project in Guangdong province has been analyzed and assessed and forecacted. (authors)

  20. Preoperational Environmental Survey for the Spent Nuclear Fuel (SNF) Project Facilities

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.M.

    2000-09-28

    This document represents the report for environmental sampling of soil, vegetation, litter, cryptograms, and small mammals at the Spent Nuclear Fuel Project facilities located in 100 K and 200 East Areas in support of the preoperational environmental survey.

  1. Social and environmental impacts of the James Bay hydroelectric project

    International Nuclear Information System (INIS)

    Hornig, J.F.

    1999-01-01

    The book, which is an analysis and not an advocacy, examines the anatomy of the controversy that has swirled around the James Bay project - the La Grande and Great Whale projects combined - from the 1970s to the 1990s, and seeks, in the process, to determine whether there are lessons that can be learned from such an analysis that are applicable to other cases as well as to James Bay itself. The contributors are interested, at one and the same time, in finding ways to integrate the knowledge of natural scientists and social scientists to deepen the understanding of human/environment relations and to link science and policy to encourage a productive dialogue between practitioners and scholars in this increasingly important area of inquiry. The contributor's papers include the following: introduction to the issues; hydroelectric power development at James Bay: establishing a frame of reference; James Bay: environmental considerations for building large hydroelectric dams and reservoirs in Quebec; elevated mercury in fish as a result of the James Bay hydroelectric power development: perception and reality; the Cree people of James Bay: assessing the social impacts of hydroelectric dams and reservoirs; culture, social change, and Cree opposition to the James Bay hydroelectric development; and the impact of James Bay hydroelectric development on the art and craft of the James Bay Cree. The authors of the volume have attempted to stand back and examine just a few of these issues from the perspective of a variety of disciplines, and their purpose is to inform and stimulate thoughtful consideration by providing an overall perspective that might might serve to broaden the context in which specific issues can be debated. refs., 3 tabs., 5 figs

  2. Western Canada drilling cycle optimization

    International Nuclear Information System (INIS)

    2003-06-01

    The oil and gas industry in western Canada operates in annual and seasonal cycles with peak activity periods that require a large skilled labour force for short periods of time. This study examines why seismic and drilling activity is greatest during the first quarter of the year instead of being distributed evenly over the year. The objective of the study was to provide recommendations that would help optimize the industry cycle. The study includes an analysis of historical trends that validate the industry first quarter peaking activity. It also includes interviews with 36 industry representatives and provides insight and validation of trends. The final phase of the report includes recommendations that both industry and governments may wish to implement. The study includes financial, operational and environmental considerations. It was shown that natural gas directed drilling activity is strongly correlated with changes in natural gas prices. In the case of oil drilling activity, peak activity responds to oil prices from the prior quarter. In general, drilling and seismic costs are higher in the winter months because of increased demand for equipment and services. In addition winter drilling operations require a diesel fired boiler to generate steam. 36 refs., 2 tabs., 52 figs

  3. Robotic Planetary Drill Tests

    Science.gov (United States)

    Glass, Brian J.; Thompson, S.; Paulsen, G.

    2010-01-01

    Several proposed or planned planetary science missions to Mars and other Solar System bodies over the next decade require subsurface access by drilling. This paper discusses the problems of remote robotic drilling, an automation and control architecture based loosely on observed human behaviors in drilling on Earth, and an overview of robotic drilling field test results using this architecture since 2005. Both rotary-drag and rotary-percussive drills are targeted. A hybrid diagnostic approach incorporates heuristics, model-based reasoning and vibration monitoring with neural nets. Ongoing work leads to flight-ready drilling software.

  4. Niland development project geothermal loan guaranty: 49-MW (net) power plant and geothermal well field development, Imperial County, California: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    1984-10-01

    The proposed federal action addressed by this environmental assessment is the authorization of disbursements under a loan guaranteed by the US Department of Energy for the Niland Geothermal Energy Program. The disbursements will partially finance the development of a geothermal well field in the Imperial Valley of California to supply a 25-MW(e) (net) power plant. Phase I of the project is the production of 25 MW(e) (net) of power; the full rate of 49 MW (net) would be achieved during Phase II. The project is located on approximately 1600 acres (648 ha) near the city of Niland in Imperial County, California. Well field development includes the initial drilling of 8 production wells for Phase I, 8 production wells for Phase II, and the possible need for as many as 16 replacement wells over the anticipated 30-year life of the facility. Activities associated with the power plant in addition to operation are excavation and construction of the facility and associated systems (such as cooling towers). Significant environmental impacts, as defined in Council on Environmental Quality regulation 40 CFR Part 1508.27, are not expected to occur as a result of this project. Minor impacts could include the following: local degradation of ambient air quality due to particulate and/or hydrogen sulfide emissions, temporarily increased ambient noise levels due to drilling and construction activities, and increased traffic. Impacts could be significant in the event of a major spill of geothermal fluid, which could contaminate groundwater and surface waters and alter or eliminate nearby habitat. Careful land use planning and engineering design, implementation of mitigation measures for pollution control, and design and implementation of an environmental monitoring program that can provide an early indication of potential problems should ensure that impacts, except for certain accidents, will be minimized.

  5. Hanford Environmental Dose Reconstruction Project, Quarterly report, September--November 1993

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1993-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates); Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  6. Site environmental report for the Yucca Mountain Project. Calendar Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2006-10-01

    This site environmental report describes the environmental program conducted during 2005 by the U.S. Department of Energy, Office of Repository Development. The report describes the environmental laws and regulations that were applicable to the Yucca Mountain Project in 2005, the actions taken to comply with those laws and regulations, and the Project’s environmental program. The report also summarizes the data collected to monitor potential impacts of the Project on the environment.

  7. Use of the environmental resource management and analysis system at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Erjavec, J.L.

    1992-01-01

    In the past, hazardous waste site characterization and remediation using computer-based technologies has been a difficult and time-consuming process because of the need to analyze data using non-interfaced computer and software environments. The Environmental Resource Management and Analysis System (ERMA) was developed as an innovative approach to the management, analyses and depiction of data collected during a hazardous site remediation. A modular, multi-disciplined software package, ERMA integrates an environmental database management system with variety of Geographic Information System technologies. ERMA capabilities include spatial analysis, three-dimensional subsurface geologic interpretation and modeling, terrain modeling, and groundwater flow and contaminant transport modeling. ERMA's data management is provided through a set of user-modifiable, graphic interface tools that permit complex data queries, data modification and reporting. An ERMA prototype has been implemented at the Fernald Environmental Management Project (a Department of Energy cleanup site) using groundwater monitoring and elevation data collected over the last few years. ERMA has enabled the precision posting of data from the 853 groundwater monitoring wells at the site. Data from these wells have ben used to define the piezometric surface of the Great Miami Aquifer and correlate it with the uranium concentration contours of an identified groundwater plume. Using spatial query capabilities, radioactive sampling results from monitoring wells have been compared to contour maps defining the extent of the plume to determine the validity of those maps and the need for additional well locations

  8. Projects at the Western Environmental Technology Office. Quarterly technical progress report, April 1--June 30, 1995

    International Nuclear Information System (INIS)

    1995-01-01

    This report contains brief outlines of the multiple projects under the responsibility of the Western Environmental Technology Office in Butte Montana. These projects include biomass remediation, remediation of contaminated soils, mine waste technology, and several other types of remediation

  9. ENVIRONMENTAL PROTECTION: Information on EPA Project Grants and Use of Waiver Authority

    National Research Council Canada - National Science Library

    2001-01-01

    ...) awards grants to both public and private entities such as nonprofit organizations, colleges, and universities for a variety of environmental projects including research, education, and public outreach...

  10. The Chew Bahir Drilling Project (HSPDP). Deciphering climate information from the Chew Bahir sediment cores: Towards a continuous half-million year climate record near the Omo - Turkana key palaeonanthropological Site

    Science.gov (United States)

    Foerster, Verena E.; Asrat, Asfawossen; Chapot, Melissa S.; Cohen, Andrew S.; Dean, Jonathan R.; Deino, Alan; Günter, Christina; Junginger, Annett; Lamb, Henry F.; Leng, Melanie J.; Roberts, Helen M.; Schaebitz, Frank; Trauth, Martin H.

    2017-04-01

    As a contribution towards an enhanced understanding of human-climate interactions, the Hominin Sites and Paleolakes Drilling Project (HSPDP) has successfully completed coring five dominantly lacustrine archives of climate change during the last 3.5 Ma in East Africa. All five sites in Ethiopia and Kenya are adjacent to key paleoanthropological research areas encompassing diverse milestones in human evolution, dispersal episodes, and technological innovation. The 280 m-long Chew Bahir sediment records, recovered from a tectonically-bound basin in the southern Ethiopian rift in late 2014, cover the past 550 ka of environmental history, a time period that includes the transition to the Middle Stone Age, and the origin and dispersal of modern Homo sapiens. Deciphering climate information from lake sediments is challenging, due to the complex relationship between climate parameters and sediment composition. We will present the first results in our efforts to develop a reliable climate-proxy tool box for Chew Bahir by deconvolving the relationship between sedimentological and geochemical sediment composition and strongly climate-controlled processes in the basin, such as incongruent weathering, transportation and authigenic mineral alteration. Combining our first results from the long cores with those from a pilot study of short cores taken in 2009/10 along a NW-SE transect of the basin, we have developed a hypothesis linking climate forcing and paleoenvironmental signal-formation processes in the basin. X-ray diffraction analysis of the first sample sets from the long Chew Bahir record reveals similar processes that have been recognized for the uppermost 20 m during the pilot-study of the project: the diagenetic illitization of smectites during episodes of higher alkalinity and salinity in the closed-basin lake induced by a drier climate. The precise time resolution, largely continuous record and (eventually) a detailed understanding of site specific proxy formation

  11. Avoiding pollution in scientific ocean drilling

    International Nuclear Information System (INIS)

    Francis, T.J.G.

    1999-01-01

    Scientific ocean drilling has been carried out in the world's oceans since the nineteen sixties. From 1968-83 the Deep Sea Drilling Project (DSDP), managed by the Scripps Institution of Oceanography in California under a contract with the US National Science Foundation, employed the drilling vessel Glomar Challenger for this purpose. In January 1985 the Ocean Drilling Program (GDP), operated by Texas A and M University, began operations with the drillship JOIDES Resolution which continue to this day. The principal funding agency remains the US National Science Foundation, but since its inception GDP has been an international program and currently receives financial support from 21 countries. The ODP operates globally and, as with DSDP before it, drills without a riser or blowout preventer in a wide range of geological environments. Water depths at GDP drill sites have ranged from 38 m to 5969 m, but are typically within the range 1000-5000 m. Depths of penetration at GDP drill sites, while generally less than 1000 m, have ranged up to 2111 m below the sea floor. The drilling fluid is seawater, although occasional slugs of mud are circulated to clean or condition the hole. Thus drilling is carried out without well control, i.e. without the ability to control pressures within the well. Because of the absence of well control, it is vital to ensure that the drillship does not drill into an accumulation of oil or gas. Drilling into a charged reservoir and causing oil or gas to escape into the marine environment is recognised as the main pollution hazard in scientific ocean drilling

  12. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  13. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  14. Environmental Monitoring - Lillgrund Offshore Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Davy, Thomas (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-02-15

    The purpose of this report is to describe the environmental monitoring measures performed for the Lillgrund Offshore Wind Farm and to summarize the results and conclusions. Construction work started in 2006 and the plant was energized in December 2007. At the time of construction Lillgrund was the third largest wind farm offshore in the world and the first large offshore wind farm in Sweden. The purpose of the environmental monitoring is to ensure that there are no negative impacts on the environment stemming from construction of the Lillgrund wind farm as well as to ensure that the conditions stated by the authorities and the Company's commitments are met. The aim is also to collect more information and knowledge on the possible environmental impact for future offshore wind farm projects. For the Lillgrund project, all monitoring programs were included in one document, Monitoring Program - Lillgrund. It was included as part of the procedures to ensure that the Swedish legal requirements on operators control were followed. The authorities approved the document before construction started. The monitoring measures performed during the construction phase included: - A feedback and monitoring program on dredging and spillage; - A feedback and monitoring program on flora and fauna; - Studies and inspections of the refilling and re-establishment of the sea bottom; - Procedure for operators control. The mean measured sediment spillage, as part of the monitoring program on dredging and spillage, varied between 4.6 - 4.8% depending on dredger used. The maximum value allowed by the conditions is 5%. In general, the calculated values for suspended material were limited and the critical value of 0.01 kg/m3 was exceeded only in minor areas for a very limited time. No corrective actions were required. The deposition of sediment was very low and even at the most effected sites it was only just over 1 mm. The largest dredging volumes were for the foundation work, in total 82

  15. Environment-friendly drilling operation technology

    Science.gov (United States)

    Luo, Huaidong; Jing, Ning; Zhang, Yanna; Huang, Hongjun; Wei, Jun

    2017-01-01

    Under the circumstance that international safety and environmental standards being more and more stringent, drilling engineering is facing unprecedented challenges, the extensive traditional process flow is no longer accepted, the new safe and environment-friendly process is more suitable to the healthy development of the industry. In 2015, CNPCIC adopted environment-friendly drilling technology for the first time in the Chad region, ensured the safety of well control, at the same time increased the environmental protection measure, reduced the risk of environmental pollution what obtain the ratification from local government. This technology carries out recovery and disposal of crude oil, cuttings and mud without falling on the ground. The final products are used in road and well site construction, which realizes the reutilization of drilling waste, reduces the operating cost, and provides a strong technical support for cost-cutting and performance-increase of drilling engineering under low oil price.

  16. Study for increasing micro-drill reliability by vibrating drilling

    International Nuclear Information System (INIS)

    Yang Zhaojun; Li Wei; Chen Yanhong; Wang Lijiang

    1998-01-01

    A study for increasing micro-drill reliability by vibrating drilling is described. Under the experimental conditions of this study it is observed, from reliability testing and the fitting of a life-distribution function, that the lives of micro-drills under ordinary drilling follow the log-normal distribution and the lives of micro-drills under vibrating drilling follow the Weibull distribution. Calculations for reliability analysis show that vibrating drilling can increase the lives of micro-drills and correspondingly reduce the scatter of drill lives. Therefore, vibrating drilling increases the reliability of micro-drills

  17. General writing-information packet for the environmental impact project

    International Nuclear Information System (INIS)

    Raaen, H.P.

    1975-02-01

    The information packet was prepared primarily for internal use at Holifield National Laboratory. The contents include suggestions to authors of environmental statements; format of environmental statements; formats of references given in environmental statements; preparation of SELECTED BIBLIOGRAPHY; troublesome words; glossary; abbreviations, initialisms, and symbols; and MT/ST taping procedure. (U.S.)

  18. Development of controlled drilling system

    International Nuclear Information System (INIS)

    Kiho, Kenzo; Miyakawa, Kimio; Suzuki, Koichi; Sunaga, Takayuki

    2008-01-01

    In Japan, the soft sedimentary rock of the Neogene tertiary is being focused as a host rock for the High Level Radioactive Waste (HLW) disposal. Especially, the soft sedimentary rock at the offshore, region is thought to be one of the best candidates, since there is no driving force of the underground water. The measurement and logging in the bore hole in order to check the hydro-geological and geomechanical conditions of the host rock is a very important way to examine the potentially of the disposal candidates. The CRIEPI (Central Research Institute of Electric Power Industry) has been conducting the project about the controlled drilling technology and the measurement and logging technologies in its borehole. In 2000, as the beginning year of the project, we made the conceptual design of the drilling and measuring systems, and made key tools concerning each technology on an experimental basis. We have been developing sub tools constructing drilling and measuring systems since 2000, and applying these systems to the Horonobe site recent 5 years. We will briefly report the outline of the system and the results of drilling and measurement that were carried out at the Horonobe site. (author)

  19. The Iceland Deep Drilling Project 4.5 km deep well, IDDP-2, in the seawater-recharged Reykjanes geothermal field in SW Iceland has successfully reached its supercritical target

    Science.gov (United States)

    Friðleifsson, Guðmundur Ó.; Elders, Wilfred A.; Zierenberg, Robert A.; Stefánsson, Ari; Fowler, Andrew P. G.; Weisenberger, Tobias B.; Harðarson, Björn S.; Mesfin, Kiflom G.

    2017-11-01

    The Iceland Deep Drilling Project research well RN-15/IDDP-2 at Reykjanes, Iceland, reached its target of supercritical conditions at a depth of 4.5 km in January 2017. After only 6 days of heating, the measured bottom hole temperature was 426 °C, and the fluid pressure was 34 MPa. The southern tip of the Reykjanes peninsula is the landward extension of the Mid-Atlantic Ridge in Iceland. Reykjanes is unique among Icelandic geothermal systems in that it is recharged by seawater, which has a critical point of 406 °C at 29.8 MPa. The geologic setting and fluid characteristics at Reykjanes provide a geochemical analog that allows us to investigate the roots of a mid-ocean ridge submarine black smoker hydrothermal system. Drilling began with deepening an existing 2.5 km deep vertical production well (RN-15) to 3 km depth, followed by inclined drilling directed towards the main upflow zone of the system, for a total slant depth of 4659 m ( ˜ 4.5 km vertical depth). Total circulation losses of drilling fluid were encountered below 2.5 km, which could not be cured using lost circulation blocking materials or multiple cement jobs. Accordingly, drilling continued to the total depth without return of drill cuttings. Thirteen spot coring attempts were made below 3 km depth. Rocks in the cores are basalts and dolerites with alteration ranging from upper greenschist facies to amphibolite facies, suggesting that formation temperatures at depth exceed 450 °C. High-permeability circulation-fluid loss zones (feed points or feed zones) were detected at multiple depth levels below 3 km depth to bottom. The largest circulation losses (most permeable zones) occurred between the bottom of the casing and 3.4 km depth. Permeable zones encountered below 3.4 km accepted less than 5 % of the injected water. Currently, the project is attempting soft stimulation to increase deep permeability. While it is too early to speculate on the energy potential of this well and its economics, the IDDP

  20. Final Project Summary Report Bechtel Nevada and Fiberchem Environmental, Inc., Cooperative Research and Technology Development Project

    Energy Technology Data Exchange (ETDEWEB)

    R. J. Pollina

    1999-04-01

    This is a report summarizing work on a small project dedicated to adapting a new chemical sensing platform for the US Department of Energy and its customers. At the same time and in the spirit of technology transfer, FCI Environmental, Inc., would receive technical support in the form of expertise from the US Department of Energy to assist in developing this product. The sensor is a hybrid integrated-circuit, optical waveguide, chemical sensor that is patented by FCI Environmental, Inc., and manufactured under license by Texas Instruments, Inc. A down-hole penetrometer probe was designed for use in hot, 60 C, hydrocarbon-saturated, saline environment at a depth of 200 feet. The probe design includes three chemical sensing, hybrid integrated-circuits with chemical reference and measurement channels, a water seal, output electronics, and a removable measurement head for replacement in the field. A hand-held chemical detector prototype--containing a hybrid integrated-circuit chemical sensor with reference channel, us