WorldWideScience

Sample records for enhancment plan minidoka

  1. 75 FR 50777 - Minidoka Dam Spillway Replacement, Minidoka County, ID

    Science.gov (United States)

    2010-08-17

    ... management approach, which includes monitoring of effects resulting from changes in operations, has been... at the Minidoka Dam has reached the end of its functional lifespan. The concrete that forms the... water levels be dropped each winter. The headgate structures at the North Side Canal and South Side...

  2. Enhanced sludge washing evaluation plan

    International Nuclear Information System (INIS)

    Jensen, R.D.

    1994-09-01

    The Tank Waste Remediation System (TWRS) Program mission is to store, treat, and immobilize highly radioactive Hanford Site waste (current and future tank waste and the strontium/cesium capsules) in an environmentally sound, safe, and cost-effective manner. The scope of the TWRS Waste Pretreatment Program is to treat tank waste and separate that waste into HLW and LLW fractions and provide additional treatment as required to feed LLW and HLW immobilization facilities. Enhanced sludge washing was chosen as the baseline process for separating Hanford tank waste sludge. Section 1.0 briefly discusses the purpose of the evaluation plan and provides the background that led to the choice of enhanced sludge washing as the baseline process. Section 2.0 provides a brief summary of the evaluation plan details. Section 3.0 discusses, in some detail, the technical work planned to support the evaluation of enhanced sludge washing. Section 4.0 briefly discusses the potential important of policy issues to the evaluation. Section 5.0 discusses the methodology to be used in the evaluation process. Section 6.0 summarizes the milestones that have been defined to complete the enhanced sludge washing evaluation and provides a summary schedule to evaluate the performance of enhanced sludge washing. References are identified in Section 7.0, and additional schedule and milestone information is provided in the appendices

  3. Contextualising the National Development Plan for enhanced ...

    African Journals Online (AJOL)

    Integrated Development Plans (IDPs) are the planning instruments directed at strategies for enhancing service delivery in local government. As a consequence, capacity initiatives are driven by these plans to address prioritised developmental needs. The key to establishing such initiatives is informed by the National ...

  4. Directing a Quality Enhancement Plan

    Directory of Open Access Journals (Sweden)

    Ronald A. Styron, Jr.

    2015-08-01

    Full Text Available This paper is drawn from a project aimed at enhancing the quality of instructional practice and improving studentlearning outcomes in classes across an urban university located in the southern region of the United States. The strategies, employed by the project leader, are discussed in detail as framed by a new problem-solving leadership design called the Alloy Improvement Model (AIM. Data collected at the end of the second full year and reported in this paper indicated all project goals were met and that the utilization of the AIM was central to project success.

  5. RTU Comparison Calculator Enhancement Plan

    Energy Technology Data Exchange (ETDEWEB)

    Miller, James D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wang, Weimin [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Katipamula, Srinivas [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-07-01

    Over the past two years, Department of Energy’s Building Technologies Office (BTO) has been investigating ways to increase the operating efficiency of the packaged rooftop units (RTUs) in the field. First, by issuing a challenge to the RTU manufactures to increase the integrated energy efficiency ratio (IEER) by 60% over the existing ASHRAE 90.1-2010 standard. Second, by evaluating the performance of an advanced RTU controller that reduces the energy consumption by over 40%. BTO has previously also funded development of a RTU comparison calculator (RTUCC). RTUCC is a web-based tool that provides the user a way to compare energy and cost savings for two units with different efficiencies. However, the RTUCC currently cannot compare savings associated with either the RTU Challenge unit or the advanced RTU controls retrofit. Therefore, BTO has asked PNNL to enhance the tool so building owners can compare energy and savings associated with this new class of products. This document provides the details of the enhancements that are required to support estimating energy savings from use of RTU challenge units or advanced controls on existing RTUs.

  6. RTU Comparison Calculator Enhancement Plan

    Energy Technology Data Exchange (ETDEWEB)

    Miller, James D.; Wang, Weimin; Katipamula, Srinivas

    2014-03-31

    Over the past two years, Department of Energy’s Building Technologies Office (BTO) has been investigating ways to increase the operating efficiency of the packaged rooftop units (RTUs) in the field. First, by issuing a challenge to the RTU manufactures to increase the integrated energy efficiency ratio (IEER) by 60% over the existing ASHRAE 90.1-2010 standard. Second, by evaluating the performance of an advanced RTU controller that reduces the energy consumption by over 40%. BTO has previously also funded development of a RTU comparison calculator (RTUCC). RTUCC is a web-based tool that provides the user a way to compare energy and cost savings for two units with different efficiencies. However, the RTUCC currently cannot compare savings associated with either the RTU Challenge unit or the advanced RTU controls retrofit. Therefore, BTO has asked PNNL to enhance the tool so building owners can compare energy and savings associated with this new class of products. This document provides the details of the enhancements that are required to support estimating energy savings from use of RTU challenge units or advanced controls on existing RTUs.

  7. Contextualising the National Development Plan for enhanced ...

    African Journals Online (AJOL)

    Strategy, Integrated Development Planning, enhanced service delivery ..... Regarding transport and logistics infrastructure, the key focus .... In essence, spatial equity aims to locate services at accessible and convenient places for residents and support through well-developed transport systems. Therefore, the. NDP refers to ...

  8. Individual Support Plans: enhancing personal outcomes

    Directory of Open Access Journals (Sweden)

    Jos H. M. VAN LOON

    2015-03-01

    Full Text Available For organizations providing supports to persons with intellectual disability it is their main task to enhance the quality of life of their clients. Individual Support Plans should be designed with this goal in mind. Consequently, important questions in writing an ISP are: 1 What does the person want?, and 2 Which support does the person need? The outcome should obviously be a good quality of life.Furthermore we emphasize in our work the importance of evidence-based practices. Based on these starting points we propose the following guideliness for an ISP. An ISP should:–     Explore goals and personal perspectives: what does a person want in his life.–     Explore what support a person needs and wants: which supports are important for and which are important to the person.–     Formulate support strategies in answer to the personal goals, wants and needs.–     Monitor in dialogue with the person the process of support.–     Measure personal outcomes.–     Comprise an ongoing system of finetuning and adjusting.–     Use evidence based practices in doing so.–     Be transparant and comprehensible for the person.Following these guideliness we developed an internet based ISP in which the eight QOL dimensions provide the framework for developing support strategies, the dialogue with the client is build into the system of supports, and evidence based instruments are used to measure support needs and personal outcomes. 

  9. Enhancing SAT Based Planning with Landmark Knowledge

    NARCIS (Netherlands)

    Elffers, J.; Konijnenberg, D.; Walraven, E.M.P.; Spaan, M.T.J.

    2013-01-01

    Several approaches exist to solve Artificial Intelligence planning problems, but little attention has been given to the combination of using landmark knowledge and satisfiability (SAT). Landmark knowledge has been exploited successfully in the heuristics of classical planning. Recently it was also

  10. Enhancing infrastructure resilience through business continuity planning.

    Science.gov (United States)

    Fisher, Ronald; Norman, Michael; Klett, Mary

    2017-01-01

    Critical infrastructure is crucial to the functionality and wellbeing of the world around us. It is a complex network that works together to create an efficient society. The core components of critical infrastructure are dependent on one another to function at their full potential. Organisations face unprecedented environmental risks such as increased reliance on information technology and telecommunications, increased infrastructure interdependencies and globalisation. Successful organisations should integrate the components of cyber-physical and infrastructure interdependencies into a holistic risk framework. Physical security plans, cyber security plans and business continuity plans can help mitigate environmental risks. Cyber security plans are becoming the most crucial to have, yet are the least commonly found in organisations. As the reliance on cyber continues to grow, it is imperative that organisations update their business continuity and emergency preparedness activities to include this.

  11. Modeling predator habitat to enhance reintroduction planning

    Science.gov (United States)

    Shiloh M. Halsey; William J. Zielinski; Robert M. Scheller

    2015-01-01

    Context The success of species reintroduction often depends on predation risk and spatial estimates of predator habitat. The fisher (Pekania pennanti) is a species of conservation concern and populations in the western United States have declined substantially in the last century. Reintroduction plans are underway, but the ability...

  12. Does strategic planning enhance or impede innovation and firm performance?

    NARCIS (Netherlands)

    Song, Michael; Im, Subin; van der Bij, Hans; Song, Lisa Z.

    Does strategic planning enhance or impede innovation and firm performance? The current literature provides contradictory views. This study extends the resource-advantage theory to examine the conditions in which strategic planning increases or decreases the number of new product development projects

  13. Does strategic planning enhance or impede innovation and firm performance

    NARCIS (Netherlands)

    Song, Michael; Im, Subin; van der Bijl, H.M.; Song, Lisa Z.

    2011-01-01

    Does strategic planning enhance or impede innovation and firm performance? The current literature provides contradictory views. This study extends the resource-advantage theory to examine the conditions in which strategic planning increases or decreases the number of new product development projects

  14. Implementation of enhanced dynamic wedges in pinnacle treatment planning system

    International Nuclear Information System (INIS)

    Alaei, Parham; Higgins, Patrick D.; Gerbi, Bruce J.

    2005-01-01

    Enhanced dynamic wedges (EDW) provide many advantages over traditional hard wedges for linear accelerator treatments. Along with these advantages comes the responsibility of ensuring that this complex technology delivers the correct dose to patients. This involves determining the enhanced dynamic wedge factors for various field sizes and depths for use in the hand calculation of monitor units (MUs). The accurate representation of dynamic wedges in the treatment planning computer must also be ensured. This is required so that the final isodose distributions are correct and the MUs calculated by the treatment planning computer match those determined by hand calculation. We have commissioned and implemented the use of EDW in the Pinnacle radiation therapy planning system. The modeled dose profiles agree with the measured ones with a maximum difference of 2%. The MUs generated by Pinnacle are also within 2% of those calculated independently. The process of data collection and verification, beam modeling, and a discussion of a potential pitfall encountered in this process are presented in this paper

  15. National plan to enhance aviation safety through human factors improvements

    Science.gov (United States)

    Foushee, Clay

    1990-01-01

    The purpose of this section of the plan is to establish a development and implementation strategy plan for improving safety and efficiency in the Air Traffic Control (ATC) system. These improvements will be achieved through the proper applications of human factors considerations to the present and future systems. The program will have four basic goals: (1) prepare for the future system through proper hiring and training; (2) develop a controller work station team concept (managing human errors); (3) understand and address the human factors implications of negative system results; and (4) define the proper division of responsibilities and interactions between the human and the machine in ATC systems. This plan addresses six program elements which together address the overall purpose. The six program elements are: (1) determine principles of human-centered automation that will enhance aviation safety and the efficiency of the air traffic controller; (2) provide new and/or enhanced methods and techniques to measure, assess, and improve human performance in the ATC environment; (3) determine system needs and methods for information transfer between and within controller teams and between controller teams and the cockpit; (4) determine how new controller work station technology can optimally be applied and integrated to enhance safety and efficiency; (5) assess training needs and develop improved techniques and strategies for selection, training, and evaluation of controllers; and (6) develop standards, methods, and procedures for the certification and validation of human engineering in the design, testing, and implementation of any hardware or software system element which affects information flow to or from the human.

  16. Enhanced Simulated Annealing for Solving Aggregate Production Planning

    Directory of Open Access Journals (Sweden)

    Mohd Rizam Abu Bakar

    2016-01-01

    Full Text Available Simulated annealing (SA has been an effective means that can address difficulties related to optimisation problems. SA is now a common discipline for research with several productive applications such as production planning. Due to the fact that aggregate production planning (APP is one of the most considerable problems in production planning, in this paper, we present multiobjective linear programming model for APP and optimised by SA. During the course of optimising for the APP problem, it uncovered that the capability of SA was inadequate and its performance was substandard, particularly for a sizable controlled APP problem with many decision variables and plenty of constraints. Since this algorithm works sequentially then the current state will generate only one in next state that will make the search slower and the drawback is that the search may fall in local minimum which represents the best solution in only part of the solution space. In order to enhance its performance and alleviate the deficiencies in the problem solving, a modified SA (MSA is proposed. We attempt to augment the search space by starting with N+1 solutions, instead of one solution. To analyse and investigate the operations of the MSA with the standard SA and harmony search (HS, the real performance of an industrial company and simulation are made for evaluation. The results show that, compared to SA and HS, MSA offers better quality solutions with regard to convergence and accuracy.

  17. Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Urban, Mary Elizabeth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States). Process Modeling and Analysis Group

    2016-05-02

    Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, and monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.

  18. Plan Your Marketing: Enhance Profits and Reduce Risk.

    Science.gov (United States)

    Edwards, William; And Others

    This marketing unit was developed to help farm families formulate a step-by-step plan for marketing their commodities in order to help remove much of the guesswork and anxiety from the process. The unit is organized in the following eight sections: introduction; sources of risk; pricing alternatives; developing a plan (10 steps); summary;…

  19. Community wildfire protection plans: enhancing collaboration and building scoial capacity

    Science.gov (United States)

    Daniel R. Williams; Pamela J. Jakes; Sam Burns; Antony Cheng

    2009-01-01

    The Healthy Forest Restoration Act of 2003 (HFRA) was enacted to reduce wildfire risk to communities and other at-risk lands through a collaborative process of planning, prioritizing and implementing hazardous fuel reduction projects. One of the key features of HFRA is the development of community wildfire protection plans (CWPPs). We studied the development of CWPPs...

  20. Planning Report for Enhancement of the International Nuclear R and D Transparency

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Y. H.; Yang, M. S.; Ko, W. I.; So, D. S.; Lee, B. D.; Lee, T. Y.; Yang, M. H.; Lee, E. J.; Cha, H. G.; Ahn, D. H

    2006-03-15

    A planning report for the project of 'Enhancement of the International Nuclear R and D Transparency' was made in 2006. Proposed project duration is from January in 2006 to December in 2015. Scopes of the project are as follows: 1) Enhancing Korea-USA joint research on pyroprocess and safegaurds 2) Enhancing nuclear control and safety work 3) Strategy planning for the enhancement of transparency of national nuclear activities through the voluntary contribution program towards IAEA 4) Strengthening of international nuclear training and cooperative fellowship programs 5) Enhancing Korea-USA joint research on laser application technology for nuclear industry.

  1. Enhancement on infectious diseases nursing plan information system.

    Science.gov (United States)

    Yeh, Mei-Lin; Hao, Te-Hui; Hsu, Chien-Yeh

    2009-01-01

    Based on researches, the most time-consuming nursing activities, in teaching hospital, are: room patrols, the blood pressure survey, the body temperature pulse breath survey, the nursing record maintenance. The nursing record is one way to communicate data. It can allow the medical service team to understand what measures the nursing staff once did for sickness, as well as responses from sickness. Nevertheless, it is the key component to utilize the record with a clinical nursing plan, so as to provide a proficient health management. Since the maintenance of nursing plan is costly and time-consuming, therefore, it is essential to establish the nursing plan information system, which can effectively promote the nursing quality. This research main body comes from one infectious disease division nursing plan information system, which was developed in 1992, and its data base covers entire courtyard compatibility and various faculties characteristic nursing plan. The nursing staff often complained that this system is not user-friendly, its contents are not comprehensive, and sometimes it does not let staff choose the right diagnosis. Therefore this research is based on history analysis and the questionnaire survey procedure first, the infectious disease nursing plan use number of times, the frequency and the project content, then by the literature scientific theory and result of the improvement group discussion together. The original 38 infectious disease division nursing plan will be expanded to 45 nursing plans. Moreover, the common 38 infectious disease code (ICD-9), and its corresponding diagnosis items, shall automatically appear in the disease diagnose code field, so it would be better off for the nursing staff to set up the nursing plan efficiently. Infectious disease division nursing plan information system utilization ratio is promoted 9.6-folds, according to research outcome. Each task consumes 3.68 minutes beforehand-including computer program operation, the

  2. Watsonville Sloughs watershed resource conservation and enhancement plan

    Data.gov (United States)

    Department of the Interior — This document identifies feasible projects that address the long-term protection and enhancement of the Watsonville Sloughs system’s ecological values and the needs...

  3. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Science.gov (United States)

    2010-10-01

    ... to State and regional agencies. (2) Documentation of the State's project implementation capability, identifying and demonstrating the ability to implement the plan, including: (i) Established eligibility...) Demonstration that the State has the capability to effectively manage the HMGP as well as other mitigation grant...

  4. Proposals for enhancing tactical planning in grocery retailing with S&OP

    DEFF Research Database (Denmark)

    Dreyer, Heidi Carin; Kiil, Kasper; Dukovska-Popovska, Iskra

    2018-01-01

    studies from the grocery retailing industry in Finland, Norway, and the UK.Findings-The tactical planning process focuses on demand management and securing product availability from suppliers in order to reach sales targets. Less attention is directed toward balancing supply and demand or toward providing...... and demand without sacrificing the emphasis on demand planning.......Purpose-The purpose of this paper is to explore tactical planning in grocery retailing and propose how process and integration mechanisms from sales and operations planning (S&OP) can enhance retail tactical planning.Design/methodology/approach-This work follows an explorative design with case...

  5. 77 FR 15263 - Approval and Promulgation of Implementation Plans; New Jersey; Motor Vehicle Enhanced Inspection...

    Science.gov (United States)

    2012-03-15

    ..., Periodic Inspection Program for Diesel Emissions, and Self- Inspection of Certain Classes of Motor Vehicles... Promulgation of Implementation Plans; New Jersey; Motor Vehicle Enhanced Inspection and Maintenance Program... 12, 2010, to the New Jersey State Implementation Plan (SIP) pertaining to New Jersey's motor vehicle...

  6. Considerations to Enhance the Florida Domestic Security Strategic Plan

    Science.gov (United States)

    2011-03-01

    change since 2006. In his thesis, What Type of State Homeland Security Strategy Should the State of New Jersey Develop? (2007), Richard Rosell ...discussed the need for the state of New Jersey to create a homeland security strategy. Rosell first justifies the need for a strategy and then offers...August 19, 2010, from http://www.oregon.gov/OMD/OEM/plans_train/docs/Oregon_-_SHSS_- _2009[1].pdf Rosell , R. G. (2007, September). What type of state

  7. Enhancing Student’s Understanding in Entrepreneurship Through Business Plan Simulation

    OpenAIRE

    Guzairy M.; Mohamad N.; Yunus A.R.

    2018-01-01

    Business Plan is an important document for entrepreneurs to guide them managing their business. Business Plan also assist the entrepreneur to strategies their business and manage future growth. That is why Malaysian government has foster all Higher Education Provider to set entrepreneurship education as compulsory course. One of the entrepreneurship education learning outcome is the student can write effective business plan. This study focused on enhancing student’s understanding in entrepren...

  8. Shared Services for enhancing municipal planning efficiency in ...

    African Journals Online (AJOL)

    The past five years have seen a growing trend towards the notion of a Shared Services approach to enhancing municipal efficiency in the local government sector in South Africa. In KwaZulu-Natal (KZN), this approach is receiving more focused attention. In this regard, the Department of Co-operative Governance and ...

  9. Summary of strategies for planning Productivity Improvement and Quality Enhancement (PIQE)

    Science.gov (United States)

    1986-01-01

    The Summary of NASA Strategies for Productivity Improvement and Quality Enhancement respond to NASA's eighth top goal: Establish NASA as a leader in the development and application of advanced technology and management practices which contribute to significant increases in both Agency and national productivity. The Strategies provide the framework for development of the agency-wide Productivity Improvement and Quality Enhancement (PIQE) Plans.

  10. Proposals for enhancing tactical planning in grocery retailing with S&OP

    DEFF Research Database (Denmark)

    Dreyer, Heidi Carin; Kiil, Kasper; Dukovska-Popovska, Iskra

    2018-01-01

    levels of S&OP maturity. The propositions need to be investigated further through action research or additional case studies to confirm their validity.Practical implications-The study proposes a design of an S&OP process in retailing and propositions for improving tactical planning integration......Purpose-The purpose of this paper is to explore tactical planning in grocery retailing and propose how process and integration mechanisms from sales and operations planning (S&OP) can enhance retail tactical planning.Design/methodology/approach-This work follows an explorative design with case...... a single plan to guide company operations. Planning appeared to be functionally oriented with limited coordination between functional plans, but it did include external integration that improved forecast accuracy.Research limitations/implications-The study involves grocery retailer cases with variable...

  11. Wildlife Protection, Mitigation, and Enhancement Planning Phase II, Dworshak Reservoir, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, H. Jerome; Martin, Robert C.

    1989-11-01

    The Pacific Northwest Electric Power Planning and Conservation Act of 1980 directed that measures be implemented to protect, mitigate, and enhance fish and wildlife to the extent affected by development and operation of hydropower projects on the Columbia River System. This Act created the Northwest Power Planning Council, which in turn developed the Columbia River Basin Fish and Wildlife Program. This program established a four-part process: wildlife mitigation status reports; wildlife impact assessments; wildlife protection, mitigation, and enhancement plans; and implementation of protection, mitigation, and enhancement projects. This mitigation plan for the Dworshak Reservoir Hydroelectric Facility was developed to fulfill requirements of Sections 1003(b)(2) and (3) of the Columbia River Basin Fish and Wildlife Program. Specific objectives of wildlife protection, mitigation, and enhancement planning for Dworshak Reservoir included: quantify net impacts to target wildlife species affected by hydroelectric development and operation of Dworshak Dam and Reservoir; develop protection, mitigation, and enhancement goals and objectives for the target wildlife species; recommend protection, mitigation, and enhancement actions for the target wildlife species; and coordination of project activities. 46 refs., 4 figs., 31 tabs.

  12. Agricultural land-use classification using landsat imagery data, and estimates of irrigation water use in Gooding, Jerome, Lincoln, and Minidoka counties, 1992 water year, Upper Snake River basin, Idaho and western Wyoming

    Science.gov (United States)

    Maupin, Molly A.

    1997-01-01

    As part of the U.S. Geological Survey's National Water-Quality Assessment Program in the upper Snake River Basin study unit, land- and water-use data were used to describe activities that have potential effects on water quality, including biological conditions, in the basin. Land-use maps and estimates of water use by irrigated agriculture were needed for Gooding, Jerome, Lincoln, and Minidoka Counties (south-central Idaho), four of the most intensively irrigated counties in the study unit. Land use in the four counties was mapped from Landsat Thematic Mapper imagery data for the 1992 water year using the SPECTRUM computer program. Land-use data were field verified in 108 randomly selected sections (640 acres each); results compared favorably with land-use maps from other sources. Water used for irrigation during the 1992 water year was estimated using land-use and ancillary data. In 1992, a drought year, estimated irrigation withdrawals in the four counties were about 2.9 million acre-feet of water. Of the 2.9 million acre-feet, an estimated 2.12 million acre-feet of water was withdrawn from surface water, mainly the Snake River, and nearly 776,000 acre-feet was withdrawn from ground water. One-half of the 2.9 million acre-feet of water withdrawn for irrigation was considered to be lost during conveyance or was returned to the Snake River; the remainder was consumptively used by crops during the growing season.

  13. Designing an energy planning concept for enhancing the dissemination of renewable energy technologies in developing countries

    DEFF Research Database (Denmark)

    Lybæk, Rikke; Andersen, Jan; Lund, Søren

    2014-01-01

    This paper stresses the need for adapting a sustainable energy planning concept, which can support the implementation of renewable energy in developing countries; exemplified by a Vietnamese case. Many developing countries heavily rely on fossil fuel resources and will face energy supply security...... challenges in the future. At the same time their policies on renewable energy, tools and action plans supporting renewables are weak. Thus, to support a local dissemination of renewable energy we suggest applying the sustainable energy planning concept to speed up the utilization of renewables in developing...... countries, while relevant policies, tools and plans etc. simultaneously are being deployed, enhancing the framework conditions for renewable energy implementation...

  14. Designing an energy planning concept for enhancing the dissemination of renewable energy technologies in developing countries

    DEFF Research Database (Denmark)

    Lybæk, Rikke; Andersen, Jan; Lund, Søren

    2014-01-01

    challenges in the future. At the same time their policies on renewable energy, tools and action plans supporting renewables are weak. Thus, to support a local dissemination of renewable energy we suggest applying the sustainable energy planning concept to speed up the utilization of renewables in developing...... countries, while relevant policies, tools and plans etc. simultaneously are being deployed, enhancing the framework conditions for renewable energy implementation......This paper stresses the need for adapting a sustainable energy planning concept, which can support the implementation of renewable energy in developing countries; exemplified by a Vietnamese case. Many developing countries heavily rely on fossil fuel resources and will face energy supply security...

  15. Enhanced Severe Transient Analysis for Prevention Technical Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Gougar, Hans [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    This document outlines the development of a high fidelity, best estimate nuclear power plant severe transient simulation capability that will complement or enhance the integral system codes historically used for licensing and analysis of severe accidents. As with other tools in the Risk Informed Safety Margin Characterization (RISMC) Toolkit, the ultimate user of Enhanced Severe Transient Analysis and Prevention (ESTAP) capability is the plant decision-maker; the deliverable to that customer is a modern, simulation-based safety analysis capability, applicable to a much broader class of safety issues than is traditional Light Water Reactor (LWR) licensing analysis. Currently, the RISMC pathway’s major emphasis is placed on developing RELAP-7, a next-generation safety analysis code, and on showing how to use RELAP-7 to analyze margin from a modern point of view: that is, by characterizing margin in terms of the probabilistic spectra of the “loads” applied to systems, structures, and components (SSCs), and the “capacity” of those SSCs to resist those loads without failing. The first objective of the ESTAP task, and the focus of one task of this effort, is to augment RELAP-7 analyses with user-selected multi-dimensional, multi-phase models of specific plant components to simulate complex phenomena that may lead to, or exacerbate, severe transients and core damage. Such phenomena include: coolant crossflow between PWR assemblies during a severe reactivity transient, stratified single or two-phase coolant flow in primary coolant piping, inhomogeneous mixing of emergency coolant water or boric acid with hot primary coolant, and water hammer. These are well-documented phenomena associated with plant transients but that are generally not captured in system codes. They are, however, generally limited to specific components, structures, and operating conditions. The second ESTAP task is to similarly augment a severe (post-core damage) accident integral analyses code

  16. Enhancing Student’s Understanding in Entrepreneurship Through Business Plan Simulation

    Directory of Open Access Journals (Sweden)

    Guzairy M.

    2018-01-01

    Full Text Available Business Plan is an important document for entrepreneurs to guide them managing their business. Business Plan also assist the entrepreneur to strategies their business and manage future growth. That is why Malaysian government has foster all Higher Education Provider to set entrepreneurship education as compulsory course. One of the entrepreneurship education learning outcome is the student can write effective business plan. This study focused on enhancing student’s understanding in entrepreneurship through business plan simulation. This study also considers which of the factor that most facilitate the business simulation that help the student to prepare effective business plan. The methodology of this study using quantitative approach with pre-and post-research design. 114 students take part as respondent in the business simulation and answer quantitative survey pre-question and post question. The crucial findings of this study are student characteristic factor after playing the simulation contribute much on facilitate business plan learning. The result has shown that the business plan simulation can enhance undergraduate student in understanding entrepreneurship by preparing effective business plan before opening new startup.

  17. Managing environmental enhancement plans for individual research projects at a national primate research center.

    Science.gov (United States)

    Thom, Jinhee P; Crockett, Carolyn M

    2008-05-01

    We describe a method for managing environmental enhancement plans for individual research projects at a national primate research center where most monkeys are assigned to active research projects. The Psychological Well-being Program (PWB) at the University of Washington National Primate Research Center developed an Environmental Enhancement Plan form (EEPL) that allows PWB to quantify and track changes in enrichment allowances over time while ensuring that each animal is provided with as much enrichment as possible without compromising research. Very few projects involve restrictions on toys or perches. Some projects have restrictions on food treats and foraging, primarily involving the provision of these enrichments by research staff instead of husbandry staff. Restrictions are not considered exemptions unless they entirely prohibit an element of the University of Washington Environmental Enhancement Plan (UW EE Plan). All exemptions must be formally reviewed and approved by the institutional animal care and use committee. Most exemptions from elements of the UW EE Plan involve social housing. Between 2004 and 2006, the percentage of projects with no social contact restrictions increased by 1%, but those prohibiting any tactile social contact declined by 7%, and projects permitting tactile social contact during part of the study increased by 9%. The EEPL form has facilitated informing investigators about the enrichment their monkeys will receive if no restrictions or exemptions are requested and approved. The EEPL form also greatly enhances PWB's ability to coordinate the specific enrichment requirements of a project.

  18. A neo-strategic planning approach to enhance local tobacco control programs.

    Science.gov (United States)

    Douglas, Malinda R; Carter, Sara Sally R; Wilson, Andrew P; Chan, Andie

    2015-01-01

    Research in tobacco control demonstrating best practices is widely disseminated; however, application at the local level is often difficult. Translating research into practice requires a concerted effort to develop an understanding of the evidence and how it can be applied within diverse contexts. A strategic planning infrastructure was developed to support the translation of evidence-based interventions into community practice. This paper highlights the strategic process of turning "know-what" into "know-how" to facilitate the strategic planning and implementation of tobacco control best practices at the local level. The purpose, people, process, and product strategies of knowledge management and translation provided a framework for the strategic planning infrastructure. The knowledge translation concepts of audience, motivations, and mechanisms were synergized in the neo-strategic planning component design. The participants were 20 community coalitions funded to implement local tobacco control programs. From 2004 to 2011, the strategic planners facilitated a cyclical process to translate research into practice using a trio of integrated tools, skill-building workshops on strategic planning, and grantee-driven technical assistance and consultation. In the short term, the usefulness of the strategic planning components to the programs was measured. The intermediate outcome was the successful movement of the community programs from the planning stage to the implementation stage. The achievement of community-level changes in planned tobacco control efforts was the overall outcome measure for the success of the local coalitions. Seventeen of 20 communities that began the planning process implemented strategic plans. All 17 of the programs implemented evidence-based practices, resulting in numerous tobacco-free policies, increased cessation, and increased support from the media and community. Bridging the gap between research and practice can enhance the practicality

  19. SU-E-T-56: Brain Metastasis Treatment Plans for Contrast-Enhanced Synchrotron Radiation Therapy

    Energy Technology Data Exchange (ETDEWEB)

    Obeid, L; Adam, J [Grenoble Institut des Neurosciences, La Tronche, Rhone-Alpes (France); Tessier, A [Centre Hospitalier Universitaire, La Tronche, Rhone-Alpes (France); Vautrin, M; Benkebil, M [DOSIsoft, Cachan, Ile de France (France); Sihanath, R [Centre Hospitalier Universitaire, La Tronche, Rhone- Alpes (France)

    2014-06-01

    Purpose: Iodine-enhanced radiotherapy is an innovative treatment combining the selective accumulation of an iodinated contrast agent in brain tumors with irradiations using monochromatic medium energy x-rays. The aim of this study is to compare dynamic stereotactic arc-therapy and iodineenhanced SSRT. Methods: Five patients bearing brain metastasis received a standard helical 3D-scan without iodine. A second scan was acquired 13 min after an 80 g iodine infusion. Two SSRT treatment plans (with/without iodine) were performed for each patient using a dedicated Monte Carlo (MC) treatment planning system (TPS) based on the ISOgray TPS. Ten coplanar beams (6×6 cm2, shaped with collimator) were simulated. MC statistical error objective was less than 5% in the 50% isodose. The dynamic arc-therapy plan was achieved on the Iplan Brainlab TPS. The treatment plan validation criteria were fixed such that 100% of the prescribed dose is delivered at the beam isocentre and the 70% isodose contains the whole target volume. The comparison elements were the 70% isodose volume, the average and maximum doses delivered to organs at risk (OAR): brainstem, optical nerves, chiasma, eyes, skull bone and healthy brain parenchyma. Results: The stereotactic dynamic arc-therapy remains the best technique in terms of dose conformation. Iodine-enhanced SSRT presents similar performances to dynamic arc-therapy with increased brainstem and brain parenchyma sparing. One disadvantage of SSRT is the high dose to the skull bone. Iodine accumulation in metastasis may increase the dose by 20–30%, allowing a normal tissue sparing effect at constant prescribed dose. Treatment without any iodine enhancement (medium-energy stereotactic radiotherapy) is not relevant with degraded HDVs (brain, parenchyma and skull bone) comparing to stereotactic dynamic arc-therapy. Conclusion: Iodine-enhanced SSRT exhibits a good potential for brain metastasis treatment regarding the dose distribution and OAR criteria.

  20. An Enhanced Genetic Algorithm to Solve the Static and Multistage Transmission Network Expansion Planning

    OpenAIRE

    Luis A. Gallego; Marcos J. Rider; Marina Lavorato; Antonio Paldilha-Feltrin

    2012-01-01

    An enhanced genetic algorithm (EGA) is applied to solve the long-term transmission expansion planning (LTTEP) problem. The following characteristics of the proposed EGA to solve the static and multistage LTTEP problem are presented, (1) generation of an initial population using fast, efficient heuristic algorithms, (2) better implementation of the local improvement phase and (3) efficient solution of linear programming problems (LPs). Critical comparative analysis is made between the proposed...

  1. Enhancing Evacuation Plans with a Situation Awareness System Based on End-User Knowledge Provision

    Directory of Open Access Journals (Sweden)

    Augusto Morales

    2014-06-01

    Full Text Available Recent disasters have shown that having clearly defined preventive procedures and decisions is a critical component that minimizes evacuation hazards and ensures a rapid and successful evolution of evacuation plans. In this context, we present our Situation-Aware System for enhancing Evacuation Plans (SASEP system, which allows creating end-user business rules that technically support the specific events, conditions and actions related to evacuation plans. An experimental validation was carried out where 32 people faced a simulated emergency situation, 16 of them using SASEP and the other 16 using a legacy system based on static signs. From the results obtained, we compare both techniques and discuss in which situations SASEP offers a better evacuation route option, confirming that it is highly valuable when there is a threat in the evacuation route. In addition, a study about user satisfaction using both systems is presented showing in which cases the systems are assessed as satisfactory, relevant and not frustrating.

  2. Coupling systematic planning and expert judgement enhances the efficiency of river restoration.

    Science.gov (United States)

    Langhans, Simone D; Gessner, Jörn; Hermoso, Virgilio; Wolter, Christian

    2016-08-01

    Ineffectiveness of current river restoration practices hinders the achievement of ecological quality targets set by country-specific regulations. Recent advances in river restoration help planning efforts more systematically to reach ecological targets at the least costs. However, such approaches are often desktop-based and overlook real-world constraints. We argue that combining two techniques commonly used in the conservation arena - expert judgement and systematic planning - will deliver cost-effective restoration plans with a high potential for implementation. We tested this idea targeting the restoration of spawning habitat, i.e. gravel bars, for 11 rheophilic fish species along a river system in Germany (Havel-Spree rivers). With a group of local fish experts, we identified the location and extent of potential gravel bars along the rivers and necessary improvements to migration barriers to ensure fish passage. Restoration cost of each gravel bar included the cost of the action itself plus a fraction of the cost necessary to ensure longitudinal connectivity by upgrading or building fish passages located downstream. We set restoration targets according to the EU Water Framework Directive, i.e. relative abundance of 11 fish species in the reference community and optimised a restoration plan by prioritising a subset of restoration sites from the full set of identified sites, using the conservation planning software Marxan. Out of the 66 potential gravel bars, 36 sites which were mainly located in the downstream section of the system were selected, reflecting their cost-effectiveness given that fewer barriers needed intervention. Due to the limited overall number of sites that experts identified as being suitable for restoring spawning habitat, reaching abundance-targets was challenged. We conclude that coupling systematic river restoration planning with expert judgement produces optimised restoration plans that account for on-the-ground implementation constraints

  3. Recovery and enhancement plan development for the Leading Creek watershed, Meigs County, Ohio

    International Nuclear Information System (INIS)

    Currie, R.J.; Cherry, D.S.; Latimer, H.A.; Babendreier, J.E.; Van Hassel, J.H.

    1998-01-01

    Following the flooding of the Meigs No. 31 coal mine in Meigs County, Ohio, a proactive plan was developed to evaluate initial dewatering effects, recovery and development of a watershed enhancement plan. Approximately half of the 31-mile Leading Creek mainstem received ∼one billion gallons of coal mine discharge, including sludge and slurry. Damage to the stream system resulted from high conductivity (∼6,000 micromhos/cm), low pH (2.5--3.5), high metals (aluminum, cadmium, copper, iron and iron floc, lead, manganese, nickel and zinc) and total suspended solids. Most forms of aquatic life were depleted in the impacted areas. Four years after the incident, many forms of benthic macroinvertebrates and fish have recovered in the creek, with sediments purged of metals by stormwater events. The enhancement plan involves a reconnaissance of the creek and tributaries pinpointing areas of agricultural sedimentation and abandoned minedland discharges (AMD). Seventeen tributary and ten mainstem stations were addressed as point source discharges with water/sediment toxicity and in-situ testing of Asian clams. One-third of the stations were intermittently toxic from rainfall runoff and the degree of AMD input. Benthic macroinvertebrates in many tributaries were stressed and comprised 1--5 taxa. Erosion/sedimentation was addressed by the USEPA 1-Dimensional Hydrologic Simulation Program Fortran (HSPF) model, as well as incorporating land use management/habitat assessment, and data management by Geographical Information Systems

  4. Investigating the enhanced Best Performance Algorithm for Annual Crop Planning problem based on economic factors.

    Science.gov (United States)

    Adewumi, Aderemi Oluyinka; Chetty, Sivashan

    2017-01-01

    The Annual Crop Planning (ACP) problem was a recently introduced problem in the literature. This study further expounds on this problem by presenting a new mathematical formulation, which is based on market economic factors. To determine solutions, a new local search metaheuristic algorithm is investigated which is called the enhanced Best Performance Algorithm (eBPA). eBPA's results are compared against two well-known local search metaheuristic algorithms; these include Tabu Search and Simulated Annealing. The results show the potential of the eBPA for continuous optimization problems.

  5. Iskuulpa Watershed Management Plan : A Five-Year Plan for Protecting and Enhancing Fish and Wildlife Habitats in the Iskuulpa Watershed.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2003-01-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to protect, enhance, and mitigate wildlife and wildlife habitat and watershed resources in the Iskuulpa Watershed. The Iskuulpa Watershed Project was approved as a Columbia River Basin Wildlife Fish and Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1998. Iskuulpa will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the John Day and McNary Hydroelectric facilities on the Columbia River. By funding the enhancement and operation and maintenance of the Iskuulpa Watershed, BPA will receive credit towards their mitigation debt. The purpose of the Iskuulpa Watershed management plan update is to provide programmatic and site-specific standards and guidelines on how the Iskuulpa Watershed will be managed over the next three years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management.

  6. The Godparent Plan: A Pedagogical Strategy for CS1 Accompaniment and CS2 Pedagogical Enhancement

    Directory of Open Access Journals (Sweden)

    Pedro Guillermo Feijóo-García

    2018-02-01

    Full Text Available Courses such as CS1 and CS2 can present an interesting pedagogical challenge when it comes to the theory-practice relationship, along with aspects that involve the course's logistics, the programming language used, and the characteristics of the students involved in the process. This study presents an innovative didactic approach, oriented towards the accompaniment of CS1 students by CS2 students at Universidad El Bosque, Colombia, seeking with this Godparent Plan, to provide a personalized accompaniment to first semester students, whereby CS2 students enhance their domain over concepts and skills while accompanying, explaining and teaching younger peers. The results of this study are favorable, outlining a didactic scheme that can be adapted and replicated in other curricular scenarios.

  7. An Enhanced Genetic Algorithm to Solve the Static and Multistage Transmission Network Expansion Planning

    Directory of Open Access Journals (Sweden)

    Luis A. Gallego

    2012-01-01

    Full Text Available An enhanced genetic algorithm (EGA is applied to solve the long-term transmission expansion planning (LTTEP problem. The following characteristics of the proposed EGA to solve the static and multistage LTTEP problem are presented, (1 generation of an initial population using fast, efficient heuristic algorithms, (2 better implementation of the local improvement phase and (3 efficient solution of linear programming problems (LPs. Critical comparative analysis is made between the proposed genetic algorithm and traditional genetic algorithms. Results using some known systems show that the proposed EGA presented higher efficiency in solving the static and multistage LTTEP problem, solving a smaller number of linear programming problems to find the optimal solutions and thus finding a better solution to the multistage LTTEP problem.

  8. Clackamas/Hood River Habitat Enhancement Project; Implementation Plan, 1988-1992 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Medel, Ron; Hohler, David B. (Mount Hood National Forest, Clackamas River Ranger District, Estacada, OR); MacDonald, Ken (Mount Hood National Forest, Hood River Ranger District, Parkdale, OR)

    1988-01-01

    An Implementation Plan and Statement of Work is provided for high priority work in the Clackamas. Hood River and Fifteenmile sub-basins. These documents describe fish habitat improvement opportunities that can be implemented by the 1991 deadline established by the Northwest Power Planning Council. The Clackamas/Hood River Enhancement Program is an on-going project initiated in 1984. It is being cooperatively funded by the Bonneville Power Administration and the Wt. Hood National Forest. Species for management emphasis include spring chinook and coho salmon, and summer and winter steelhead trout. Improvement activities are designed to improve access at passage barriers and increase the quality and quantity of available rearing habitat. Project work will result in improved access to about 12.5 miles of high quality habitat, creation of nearly 70,000 square feet of off-channel habitat, and the addition of structure to approximately 32 miles of stream. At completion of the project, annual production capability from these two sub-basins will be increased by 85-100,000 smolts. Details of a monitoring and evaluation effort consistent with measure 200(d)(l) of the Council's Fish and Wildlife Program are also provided.

  9. QUALITY ENHANCEMENT IN MAINTENANCE PLANNING THROUGH NON-IDENTICAL FMECA APPROACHES

    Directory of Open Access Journals (Sweden)

    Nilesh Pancholi

    2017-09-01

    Full Text Available The purpose of this paper is to investigate the scope of reliability improvement of aluminium wire rolling mill. This paper addresses the performance reliability of continuous process industry of interest to many applications in maintenance planning where multi-attribute decision making (MADM approaches are very useful. The paper addresses the process of discriminating critical components through substantial shop-floor failure data. The research work narrates a method for evaluating risk priority number (RPN traditionally. Moreover, the maintainability criticality index (MCI for each failure cause of identified critical components is evaluated through two disparate MADM failure models: technique for order preference by similarity to ideal solution (TOPSIS and preference section index (PSI to overcome the limitations of more traditional approaches. The primary findings of this research work are to enhance quality in planning the maintenance activities of critical components of targeted process industry through traditional as well as non-traditional failure analysis models. The research work is focused on potential failure causes of critical components like; bearings, gears, and shafts of aluminium wire rolling mill which are commonly representing the most critical components in a large range of industrial processes including aluminium wires. The proposed work will illustrate the working lives of components and associated failures. It will help to elucidate maintenance issues of major process industries and recommended deliverable keys.

  10. Wildlife Protection, Mitigation and Enhancement Planning for Grand Coulee Dam, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Creveling, Jennifer

    1986-08-01

    The development and operation of Grand Coulee Dam inundated approximately 70,000 acres of wildlife habitat under the jurisdictions of the Colville Confederated Tribes, the Spokane Tribe, and the State of Washington. Under the provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, this study reviews losses to wildlife and habitat, and proposes mitigation for those losses. Wildlife loss estimates were developed from information available in the literature. Habitat losses and potential habitat gains through mitigation were estimated by a modified Habitat Evaluation Procedure. The mitigation plan proposes (1) acquisition of sufficient land or management rights to land to protect Habitat Units equivalent to those lost (approximately 73,000 acres of land would be required), (2) improvement and management of those lands to obtain and perpetuate target Habitat Units, and (3) protection and enhancement of suitable habitat for bald eagles. Mitigation is presented as four actions to be implemented over a 10-year period. A monitoring program is proposed to monitor mitigation success in terms of Habitat Units and wildlife population trends.

  11. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2001-09-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such

  12. Determining Coastal Hazards Risk Perception to Enhance Local Mitigation Planning through a Participatory Mapping Approach

    Science.gov (United States)

    Bethel, M.; Braud, D.; Lambeth, T.; Biber, P.; Wu, W.

    2017-12-01

    Coastal community leaders, government officials, and natural resource managers must be able to accurately assess and predict a given coastal landscape's sustainability and/or vulnerability as coastal habitat continues to undergo rapid and dramatic changes associated with natural and anthropogenic activities such as accelerated relative sea level rise (SLR). To help address this information need, a multi-disciplinary project team conducted Sea Grant sponsored research in Louisiana and Mississippi with traditional ecosystem users and natural resource managers to determine a method for producing localized vulnerability and sustainability maps for projected SLR and storm surge impacts, and determine how and whether the results of such an approach can provide more useful information to enhance hazard mitigation planning. The goals of the project are to develop and refine SLR visualization tools for local implementation in areas experiencing subsidence and erosion, and discover the different ways stakeholder groups evaluate risk and plan mitigation strategies associated with projected SLR and storm surge. Results from physical information derived from data and modeling of subsidence, erosion, engineered restoration and coastal protection features, historical land loss, and future land projections under SLR are integrated with complimentary traditional ecological knowledge (TEK) offered by the collaborating local ecosystem users for these assessments. The data analysis involves interviewing stakeholders, coding the interviews for themes, and then converting the themes into vulnerability and sustainability factors. Each factor is weighted according to emphasis by the TEK experts and number of experts who mention it to determine which factors are the highest priority. The priority factors are then mapped with emphasis on the perception of contributing to local community vulnerability or sustainability to SLR and storm surge. The maps are used by the collaborators to benefit

  13. Geodiversity action plans for the enhancement of geoheritage in the Piemonte region (north-western Italy

    Directory of Open Access Journals (Sweden)

    Elena Ferrero

    2012-07-01

    Full Text Available A geoethical approach to geodiversity allows better understanding of the value of abiotic nature and enhances its conservation and development. Our basic assumption is that even during an economical crisis, geoheritage sites can serve both public and private interests. A set of nine strategic geothematic areas were chosen to represent the geodiversity of the Piemonte region, north-western Italy, each of which is characterized by great potential for scientific studies, enhancement of public understanding of science, recreational activities, and economic support to the local communities. Specialized research teams individuated critical aspects to advance our knowledge of the geological history of the Piemonte region, through climate and environmental changes, natural hazards, soil processes, and georesources. The scientific concepts and techniques were coupled with geodiffusion actions and products: not only geosites, but also museum collections, evidence of mining and quarrying activities, science exhibitions, and nature trails. The preliminary results have allowed action plans to be developed with local partners, to assess the geoheritage management requirements. A series of investigations were carried out to improve the visual representation of the geological processes and the evolutionary scenarios. Further outcomes of the project will include didactic tools for educators, schools, and the public in general.

  14. Review of Current Aircrew Coordination Training Program and Master Plan for Program Enhancement: Aircrew Coordination Training Master Plan

    National Research Council Canada - National Science Library

    Grubb, G

    2001-01-01

    ...) program to develop a master plan of continuous improvement. Research source materials included policies, training courseware, evaluation guides, research papers and reports, and assessment summaries of operational trend data...

  15. Does enhancing consciousness for strategic planning processes support the effectiveness of problem-based learning concepts in biomedical education?

    Directory of Open Access Journals (Sweden)

    Arling V.

    2015-09-01

    Full Text Available Interdisciplinary skills gain increasing importance in university and professional contexts. To support these interdisciplinary skills, problem-based learning (PBL is regularly used in a course for biomedical education. In this study, we investigated whether enhancing consciousness for planning processes can support the effectiveness of PBL concepts in an intervention-control group design. Results indicated clear evidence for this: planning skills were associated with better PBL performance. Concluding, self-reflection of planning skills is useful to increase outcome performance of students in PBL courses.

  16. Enhancing sediment flux control and natural hazard risk mitigation through a structured conceptual planning approach

    Science.gov (United States)

    Simoni, S.; Vignoli, G.; Mazzorana, B.

    2017-08-01

    Sediment fluxes from mountain rivers contribute to shape the geomorphologic features of lowland rivers and to establish the physical basis for an optimal set of ecosystem functions and related services to people. Through significant public funding, the hydro-morphological regimes of mountain rivers in the European Alps have been progressively altered over the last century, with the aim to provide a safe dwelling space, to boost transport, mobility and to support economic growth. We claim that the underlying planning weaknesses contribute to determine these inefficient resource allocations, since flood risk is still high and the ecosystem services are far from being optimal. Hence, with the overall aim to enhance sediment flux control and hazard risk mitigation in such heavily modified alpine streams, we propose a structured design workflow which guides the planner through system analysis and synthesis. As a first step the proposed workflow sets the relevant planning goals and assesses the protection structure functionality. Then a methodology is proposed to achieve the goals. This methodology consists in characterising the hydrologic basin of interest and the sediment availability and determining the sediment connectivity to channels. The focus is set on the detailed analysis of existing river cross sections where the sediment continuity is interrupted (e.g. slit and check dams). By retaining relevant sediment volumes these structures prevent the reactivation of hydro-morphological and associated ecological functionalities. Since their actual performance can be unsatisfying with respect to flood risk mitigation (e.g. mainly old structures), we introduce specific efficiency indicators as a support for the conceptual design stage to quantify effects related to sediment flux control and risk management. The proposed planning approach is then applied to the Gadria system (stream, slit dam, retention basin and culvert), located in South Tyrol, Italy. This case study

  17. Metropolization Process for enhancing local and regional planning : an experience of cirebon metropolitan, West Java

    Science.gov (United States)

    Supriyadi Rustidja, E.

    2018-03-01

    Metropolitan develops in line with resource utilization, investment, and transactions of regional activities. Metropolization of an area gives emerge urban economy that changes the situation, form, and pattern of urban space interactions. On the other hand, metropolism concerns the strategy of changing variation of urban space, so that metropolitan invasion not only form of urban space but also the process of interaction among stakeholders in developing metropolitan area. Based on participatory research, this article explores metropolitan invasion process for enhancing local and regional planning, both indigenous and intrusive cataclysmic. The study find that the primeval, rural, and urban as elemental environment must be considered in developing metropolitan, not merely form the structure and pattern of urban space. The metropolization process also requires the strategic of rural urban linkage, context setting and local assessment, strategic community investment, and interculturalist approach. The other findings of the study show that metropolization in Cirebon Metropolitan, West Java emphasizing on promotion of competitiveness strategy, value chain urban activities, and networking of urban areas. Cirebon Metropolitan must promote the realization of growth centers and connect the interregional activities of metropolitan area for providing sustainable economic growth.

  18. Improvements to Strategic Planning and Implementation through Enhanced Correlation with Decision-Making Frameworks

    Science.gov (United States)

    McCready, John W.

    2010-01-01

    The purpose of this study was to examine use of decision-making tools and feedback in strategic planning in order to develop a rigorous process that would promote the efficiency of strategic planning for acquisitions in the United States Coast Guard (USCG). Strategic planning is critical to agencies such as the USCG in order to be effective…

  19. NAS operational evolution plan : a foundation for capacity enhancement 2001-2010

    Science.gov (United States)

    2001-06-01

    This series of World Wide Web slides focuses on the Operational Evolution Plan, which is a 10-year plan for aviation operational improvements to increase capacity and safety in the United States. This plan is unique in that it integrates all actions:...

  20. 76 FR 18780 - Integrated Water Resource Management Plan, Yakima River Basin Water Enhancement Project, Benton...

    Science.gov (United States)

    2011-04-05

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Integrated Water Resource Management Plan, Yakima... Environmental Impact Statement (EIS) on the Integrated Water Resource Management Plan, Yakima River Basin Water... Integrated Water Resource Management Plan that will be analyzed in the Programmatic EIS include, but are not...

  1. Treatment planning considerations in contrast-enhanced radiotherapy: energy and beam aperture optimization

    Energy Technology Data Exchange (ETDEWEB)

    Garnica-Garza, H M, E-mail: hgarnica@cinvestav.mx [Centro de Investigacion y de Estudios Avanzados del Instituto Politecnico Nacional Unidad Monterrey, Via del Conocimiento 201 Parque de Investigacion e Innovacion Tecnologica, Apodaca NL CP 66600 (Mexico)

    2011-01-21

    It has been shown that the use of kilovoltage x-rays in conjunction with a contrast agent incorporated into the tumor can lead to acceptable treatment plans with regard to the absorbed dose distribution produced in the target as well as in the tissue and organs at risk surrounding it. In this work, several key aspects related to the technology and irradiation techniques necessary to clinically implement this treatment modality are addressed by means of Monte Carlo simulation. The Zubal phantom was used to model a prostate radiotherapy treatment, a challenging site due to the depth of the prostate and the presence of bony structures that must be traversed by the x-ray beam on its way to the target. It is assumed that the concentration levels of the enhancing agent present in the tumor are at or below 10 mg per 1 g of tissue. The Monte Carlo code PENELOPE was used to model a commercial x-ray tube having a tungsten target. X-ray energy spectra for several combinations of peak electron energy and added filtration were obtained. For each energy spectrum, a treatment plan was calculated, with the PENELOPE Monte Carlo code, by modeling the irradiation of the patient as 72 independent conformal beams distributed at intervals of 5{sup 0} around the phantom in order to model a full x-ray source rotation. The Cimmino optimization algorithm was then used to find the optimum beam weight and energy for different treatment strategies. It is shown that for a target dose prescription of 72 Gy covering the whole tumor, the maximum rectal wall and bladder doses are kept below 52 Gy for the largest concentration of contrast agent of 10 mg per 1 g of tissue. It is also shown that concentrations of as little as 5 mg per 1 g of tissue also render dose distributions with excellent sparing of the organs at risk. A treatment strategy to address the presence of non-uniform distributions of the contrast agent in the target is also modeled and discussed.

  2. Dosimetric parameters of enhanced dynamic wedge for treatment planning and verification

    International Nuclear Information System (INIS)

    Leavitt, Dennis D.; Lee, Wing Lok; Gaffney, David K.

    1996-01-01

    Purpose/Objective: Enhanced Dynamic Wedge (EDW) is an intensity-modulated radiotherapy technique in which one collimating jaw sweeps across the field to define a desired wedge dose distribution while dose rate is modified according to jaw position. This tool enables discrete or continuous wedge angles from zero to sixty degrees for field widths from three cm to 30 cm in the direction of the wedge, and up to 40 cm perpendicular to the wedge direction. Additionally, asymmetric wedge fields not centered on the line through isocenter can be created for applications such as tangential breast irradiation. The unique range of field shapes and wedge angles introduce a new set of dosimetric challenges to be resolved before routine clinical use of EDW, and especially require that a simple set of independent dose calculation and verification techniques be developed to check computerized treatment planning results. Using terminology in common use in treatment planning, this work defines the effective wedge factor vs. field width and wedge angle, evaluates the depth dose vs. open field values, defines primary intensity functions from which specific dynamic wedges can be calculated in treatment planning systems, and describes the technique for independent calculation of Monitor Units for EDW fields. Materials and Methods: Using 6- and 18-MV beams from a CI2100C, EDW beam profiles were measured in water phantom for depths from near-surface to 30 cm for the full range of field widths and wedge angles using a linear detector array of 25 energy-compensated diodes. Asymmetric wedge field profiles were likewise measured. Depth doses were measured in water phantom using an ionization chamber sequentially positioned to depths of 30 cm. Effective wedge factors for the full range of field widths and wedge angles were measured using an ionization chamber in water-equivalent plastic at a depth of 10 cm on central axis. Dose profiles were calculated by computer as the summation of a series

  3. Technical ideas of recovery enhancement in the Sulige Gasfield during the 13th Five-Year Plan

    Directory of Open Access Journals (Sweden)

    Zhongguo Tan

    2016-05-01

    Full Text Available Based on the exploration and development achievements of the Sulige Gasfield in the Ordos Basin, tight sandstone gas yield has been increased essentially in China. Recovery enhancement is always the core subject in researches. In this paper, the development history of the Sulige Gasfield was reviewed focusing on the technological progress in single well production enhancement. Then, the technical ideas on and countermeasures for transforming the traditional development modes and increasing recovery factor were discussed. It is shown that the development technologies in the evaluation and the production enhancement and stabilization of giant tight sandstone gas reservoirs are changed progressively. The fast increase of gas production in this field is made possible by well location arrangement technology based on sweep spot screening, horizontal well development technology, well type and well pattern optimization technology, fast drilling technology, reservoir stimulation technology, drainage gas recovery technology and integrated construction mode. And finally, the technical ideas of recovery enhancement during the 13th Five-Year Plan were proposed in nine aspects, including gas field development, planning and evaluation technology based on single-well life cycle analysis; dynamic evaluation and infilling technology for mixed well patterns targeting recovery enhancement; one-shot recovery enhancement technology for a new areal pattern area with integrated multiple well patterns and multiple series of strata; reserve evaluation model based on risk and benefit evaluation; gas-well precise management technology with multi-dimensional matrix; potential tapping technology for low production and low efficiency wells; novel wellsite environmental protection technology; surface process based on integrated equipments; and C3+ mixed hydrocarbon recovery technology. It provides technically reliable support for the development of tight sandstone gas

  4. Army Pacific Pathways: Comprehensive Assessment and Planning Needed to Capture Benefits Relative to Costs and Enhance Value for Participating Units

    Science.gov (United States)

    2016-11-01

    task force for approximately 90 days to conduct a series of exercises in the Asia-Pacific for the purpose of enhancing readiness and strengthening ... exercise is at the core of planning for Pacific Pathways, but unit after- action reviews from multiple Pathway operations indicated that this structure...Pathways is an initiative that combines three to four exercises with partner nations— exercises that were previously conducted as stand-alone events

  5. Making the Most of What We Have Got: Enhancing the RADAR Repository to Support Research Planning

    Science.gov (United States)

    Pike, Dawn; Siminson, Nicola Jane

    2017-01-01

    This article discusses how RADAR, the institutional repository (IR) at the Glasgow School of Art (GSA), has been modified to house an Annual Research Planning (ARP) template. A case study on the implementation of this research planning tool will outline the role that a repository and its staff can play in supporting individuals, enhancing…

  6. Advanced computing for evaluating facility needs and enhancing sustainable development of public facility investment plan

    CSIR Research Space (South Africa)

    Green, Cheri A

    2009-06-01

    Full Text Available This paper describes the use of a GIS-based methodology for assessing and planning social facility provision and developing an integrated facility plan which is defensible and impacts meaningfully on resource allocation. A case study of community...

  7. Enhancing Strategic Planning through Campus Surveys. AIR 1994 Annual Forum Paper.

    Science.gov (United States)

    Hurst, Peter J.

    This case study presents Cornell University's use of campus surveying to gather information from stakeholders for strategic planning purposes. The case study emphasizes how survey creation, distribution, analysis, and reporting of findings was woven into the strategic planning process. Every step of the process, from item generation to the use of…

  8. Closing the Communication Gap: "Web 2.0 Tools for Enhanced Planning and Collaboration"

    Science.gov (United States)

    Charles, Kelly J.; Dickens, Virginia

    2012-01-01

    Web 2.0 is expanding the way general and special educators collaborate, especially in co-teaching situations. This article draws attention to several free web-based tools and a co-teaching lesson plan supplement that can be used to incorporate Web 2.0 technologies during the co-planning, co-teaching and shared reflection processes between the…

  9. Enhancement of a model for Large-scale Airline Network Planning Problems

    NARCIS (Netherlands)

    Kölker, K.; Lopes dos Santos, Bruno F.; Lütjens, K.

    2016-01-01

    The main focus of this study is to solve the network planning problem based on passenger decision criteria including the preferred departure time and travel time for a real-sized airline network. For this purpose, a model of the integrated network planning problem is formulated including scheduling

  10. Test and Evaluation for Enhanced Security: A Quantitative Method to Incorporate Expert Knowledge into Test Planning Decisions.

    Energy Technology Data Exchange (ETDEWEB)

    Rizzo, Davinia [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Blackburn, Mark [Stevens Inst. of Technology, Hoboken, NJ (United States)

    2017-03-01

    Complex systems are comprised of technical, social, political and environmental factors as well as the programmatic factors of cost, schedule and risk. Testing these systems for enhanced security requires expert knowledge in many different fields. It is important to test these systems to ensure effectiveness, but testing is limited to due cost, schedule, safety, feasibility and a myriad of other reasons. Without an effective decision framework for Test and Evaluation (T&E) planning that can take into consideration technical as well as programmatic factors and leverage expert knowledge, security in complex systems may not be assessed effectively. Therefore, this paper covers the identification of the current T&E planning problem and an approach to include the full variety of factors and leverage expert knowledge in T&E planning through the use of Bayesian Networks (BN).

  11. A mass merchandiser's role in enhancing pharmacy students' business plan development skills for medication therapy management services.

    Science.gov (United States)

    Moultry, Aisha Morris

    2011-09-10

    To develop a relationship between a pharmacy management course and a mass merchandiser and to determine whether involving pharmacy managers from the mass merchandiser in the course would enhance student skills in developing a business plan for medication therapy management services. The pharmacy managers from the mass merchandiser participated in lectures, provided panel discussions, and conducted a business plan competition. Learning was assessed by means of 4 examinations and 1 project (ie, the business plan). At the conclusion of the semester, surveys were administered to solicit student input and gain insight from pharmacy managers on the perceived value of this portion of the course. Students' average grade on the business plan assignment, which included the oral presentation, the peer assessment, and the written proposal, was 92.2%. Approximately 60% (n=53) of surveyed students agreed or strongly agreed that their management skills had improved because of the participation of pharmacy managers from the mass merchandiser. All of the managers enjoyed participating in the experience. The involvement of pharmacy managers from a mass merchandiser enhanced student learning in the classroom, and managers felt that their participation was an important contribution to the development of future pharmacists.

  12. A Mass Merchandiser's Role in Enhancing Pharmacy Students’ Business Plan Development Skills for Medication Therapy Management Services

    Science.gov (United States)

    2011-01-01

    Objectives. To develop a relationship between a pharmacy management course and a mass merchandiser and to determine whether involving pharmacy managers from the mass merchandiser in the course would enhance student skills in developing a business plan for medication therapy management services. Design. The pharmacy managers from the mass merchandiser participated in lectures, provided panel discussions, and conducted a business plan competition. Learning was assessed by means of 4 examinations and 1 project (ie, the business plan). At the conclusion of the semester, surveys were administered to solicit student input and gain insight from pharmacy managers on the perceived value of this portion of the course. Assessment. Students’ average grade on the business plan assignment, which included the oral presentation, the peer assessment, and the written proposal, was 92.2%. Approximately 60% (n = 53) of surveyed students agreed or strongly agreed that their management skills had improved because of the participation of pharmacy managers from the mass merchandiser. All of the managers enjoyed participating in the experience. Conclusions. The involvement of pharmacy managers from a mass merchandiser enhanced student learning in the classroom, and managers felt that their participation was an important contribution to the development of future pharmacists. PMID:21969719

  13. 76 FR 78940 - Minidoka National Wildlife Refuge, Blaine, Cassia, Minidoka, and Power Counties, ID...

    Science.gov (United States)

    2011-12-20

    ... education and interpretation. We will review and update the CCP at least every 15 years in accordance with.... The Refuge is located 12 miles northeast of Rupert, ID, in the Snake River Plain, at approximately 4,200 feet in elevation. The area was historically comprised of a portion of the Snake River surrounded...

  14. Enhancing the Career Planning Self-Determination of Young Adults with Mental Health Challenges.

    Science.gov (United States)

    Sowers, Jo-Ann; Swank, Paul

    2017-01-01

    The impact of an intervention on the self-determination and career planning engagement of young adults with mental health challenges was studied. Sixty-seven young adults, 20 to 30 years of age, with mental health diagnoses (e.g., depression, bipolar disorder) were randomly assigned to intervention and control groups. Statistically significant greater increases were made by the intervention group versus the control group for self-determination and career planning engagement, and self-determination at least partially mediated increases in career planning engagement. With career planning self-determination interventions, young adults with mental health challenges might be able to achieve better career and life outcomes than is typical for this population.

  15. Public health and urban planning: a powerful alliance to be enhanced in Italy.

    Science.gov (United States)

    D'Alessandro, D; Appolloni, L; Capasso, L

    2017-01-01

    Urban planning has played and still plays a key role in improving urban health and indoor health. The authors sketch out the historical evolution of the relationships between Public Health and urban planning, in particular to what happened in Italy during the past 150 years. The authors suggest some lines for further research, but also describe some interventions that could obtain practical results in terms of health gains for the population.

  16. Accuracy and role of contrast-enhanced CT in diagnosis and surgical planning in 88 soft tissue tumours of extremities.

    Science.gov (United States)

    Verga, Lucia; Brach Del Prever, Elena Maria; Linari, Alessandra; Robiati, Sara; De Marchi, Armanda; Martorano, Domenico; Boffano, Michele; Piana, Raimondo; Faletti, Carlo

    2016-07-01

    Soft tissue tumours (STT) require accurate diagnosis in order to identify potential malignancies. Preoperative planning is fundamental to avoid inadequate treatments. The role of contrast-enhanced computed tomography (CT) for local staging remains incompletely assessed. Aims of the study were to evaluate CT accuracy in discriminating active from aggressive tumours compared to histology and evaluate the role of CT angiography (CTA) in surgical planning. This retrospective cohort series of 88 cases from 1200 patients (7 %) was locally studied by contrast-enhanced CT and CTA in a referral centre: 74 malignant tumours, 14 benign lesions. Contrast-enhancement patterns and relationship of the mass with major vessels and bone were compared with histology on surgically excised samples. Sensitivity, specificity, positive and negative predictive values (PPV, NPV) were evaluated in discriminating active from aggressive tumours. Sensitivity in differentiating aggressive tumours from active lesions was 89 %, specificity 84 %, PPV 90 %, NPV 82 %. The relationship between mass and major vessels/bone was fundamental for surgical strategy respectively in 40 % and in 58 % of malignant tumours. Contrast-enhanced CT and CTA are effective in differentiating aggressive masses from active lesions in soft tissue and in depicting the relationship between tumour and adjacent bones and major vessels. • Accurate delineation of vascular and bony involvement preoperatively is fundamental for a correct resection. • CT plays a critical role in differential diagnosis of soft tissue masses. • Contrast-enhanced CT and CT angiography are helpful in depicting tumoral vascular involvement. • CT is optimal for characterization of bone involvement in soft tissue malignancies.

  17. A low-carbon future: Spatial planning's role in enhancing technological innovation in the built environment

    International Nuclear Information System (INIS)

    Crawford, Jenny; French, Will

    2008-01-01

    The scope of spatial planning activity includes issues of governance, corporate organisation, policy integration, statutory and regulatory frameworks, and technical analysis and design. The nature of its potential contribution to achieving low-carbon built environments will vary according to the resolution of tensions between pressures for leadership, consistent decision making and speed of change and the value placed on diversity, flexibility and innovation. A planning system that can support technological innovation will be characterised by high levels of organisational and institutional capacity and high-quality knowledge systems that support a focus on delivering place-based objectives. The paper reflects on further aspects of such a system and the issues that spatial planning needs to address in delivering low-carbon energy systems

  18. Enhancing English Language Planning Strategy Using a WebQuest Model

    Science.gov (United States)

    Al-Sayed, Rania Kamal Muhammad; Abdel-Haq, Eman Muhammad; El-Deeb, Mervat Abou-Bakr; Ali, Mahsoub Abdel-Sadeq

    2016-01-01

    The present study aimed at developing English language planning strategy of second year distinguished governmental language preparatory school pupils using the a WebQuest model. Fifty participants from second year at Hassan Abu-Bakr Distinguished Governmental Language School at Al-Qanater Al-Khairia (Qalubia Governorate) were randomly assigned…

  19. The Role of the Quality Enhancement Plan in Engendering a Culture of Assessment

    Science.gov (United States)

    Loughman, Thomas P.; Hickson, Joyce; Sheeks, Gina L.; Hortman, J. William

    2008-01-01

    During the past two decades, colleges and universities have used best practices from corporate management such as total quality management, strategic planning, management by objectives, benchmarking, data warehousing, and performance indicators. Many institutions of higher learning now have adopted comprehensive and multifaceted approaches to…

  20. Homes for Wildlife: A Planning Guide for Habitat Enhancement on School Grounds.

    Science.gov (United States)

    Wyzga, Marilyn C.

    This guide for enhancing wildlife habitats on school grounds provides students and teachers the opportunity for direct, hands-on learning in the environment of their schoolyard. Geared towards grades K-8, all activities are developmentally appropriate to involve students on every level, resulting in student ownership of the project and a greater…

  1. 76 FR 57696 - Approval and Promulgation of Implementation Plans; New York; Motor Vehicle Enhanced Inspection...

    Science.gov (United States)

    2011-09-16

    ... motor vehicles that exhibit excessive emissions of certain air pollutants. The enhanced I/M program is... pollution. On April 5, 2001, EPA published in the Federal Register ``Amendments to Vehicle Inspection and... State effective dates identified. \\2\\ On July 6, 2011, EPA issued the Cross-State Air Pollution Rule...

  2. A Human-Centered C2 Assessment of Model and Simulation Enhanced Planning Tools

    Science.gov (United States)

    2014-06-01

    te s L1 L2 L3 10 continuing through adulthood (Norman, 1988). This section will investigate whether or not the COMPOEX MRMs enhanced the...conflict, PMESII, DIME, situation understanding, shared situation understanding, trust, workload, cognitive maps, coordination, Pathfinder, social network... similarity between knowledge structures of the military and civilian/government groups over time. Trend line represents a significant positive trend

  3. The Planning and Scheduling of HST: Improvements and Enhancements since Launch

    Science.gov (United States)

    Taylor, D. K.; Chance, D. R.; Jordan, I. J. E.; Patterson, A. P.; Stanley, M.; Taylor, D. C.

    2001-12-01

    The planning and scheduling (P&S) systems used in operating the Hubble Space Telescope (HST) have undergone such substantial and pervasive re-engineering that today they dimly resemble those used when HST was launched. Processes (i.e., software, procedures, networking, etc.) which allow program implementation, the generation of a Long Range Plan (LRP), and the scheduling of science and mission activities have improved drastically in nearly 12 years, resulting in a consistently high observing efficiency, a stable LRP that principal investigators can use, exceptionally clean command loads uplinked to the spacecraft, and the capability of a very fast response time due to onboard anomalies or targets of opportunity. In this presentation we describe many of the systems which comprise the P&S ("front-end") system for HST, how and why they were improved, and what benefits have been realized by either the HST user community or the STScI staff. The systems include the Guide Star System, the Remote Proposal Submission System - 2 (RPS2), Artificial Intelligence (AI) planning tools such as Spike, and the science and mission scheduling software. We also describe how using modern software languages such as Python and better development practices allow STScI staff to do more with HST (e.g., to handle much more science data when ACS is installed) without increasing the cost to HST operations.

  4. Wildfire Prevention and Suppression plans enhancing: a first overview on strength and weakness in Italian stakeholders experiences and perception.

    Science.gov (United States)

    Bonora, Laura; Conese, Claudio; Barbati, Anna

    2014-05-01

    stakeholder is the future challenge to enhance the plans efficacy.

  5. Context and meter enhance long-range planning in music performance.

    Science.gov (United States)

    Mathias, Brian; Pfordresher, Peter Q; Palmer, Caroline

    2014-01-01

    Neural responses demonstrate evidence of resonance, or oscillation, during the production of periodic auditory events. Music contains periodic auditory events that give rise to a sense of beat, which in turn generates a sense of meter on the basis of multiple periodicities. Metrical hierarchies may aid memory for music by facilitating similarity-based associations among sequence events at different periodic distances that unfold in longer contexts. A fundamental question is how metrical associations arising from a musical context influence memory during music performance. Longer contexts may facilitate metrical associations at higher hierarchical levels more than shorter contexts, a prediction of the range model, a formal model of planning processes in music performance (Palmer and Pfordresher, 2003; Pfordresher et al., 2007). Serial ordering errors, in which intended sequence events are produced in incorrect sequence positions, were measured as skilled pianists performed musical pieces that contained excerpts embedded in long or short musical contexts. Pitch errors arose from metrically similar positions and further sequential distances more often when the excerpt was embedded in long contexts compared to short contexts. Musicians' keystroke intensities and error rates also revealed influences of metrical hierarchies, which differed for performances in long and short contexts. The range model accounted for contextual effects and provided better fits to empirical findings when metrical associations between sequence events were included. Longer sequence contexts may facilitate planning during sequence production by increasing conceptual similarity between hierarchically associated events. These findings are consistent with the notion that neural oscillations at multiple periodicities may strengthen metrical associations across sequence events during planning.

  6. Context and meter enhance long-range planning in music performance

    Directory of Open Access Journals (Sweden)

    Brian eMathias

    2015-01-01

    Full Text Available Neural responses demonstrate evidence of resonance, or oscillation, during the production of periodic auditory events. Music contains periodic auditory events that give rise to a sense of beat, which in turn generates a sense of meter on the basis of multiple periodicities. Metrical hierarchies may aid memory for music by facilitating similarity-based associations among sequence events at different periodic distances that unfold in longer contexts. A fundamental question is how metrical associations arising from a musical context influence memory during music performance. Longer contexts may facilitate metrical associations at higher hierarchical levels more than shorter contexts, a prediction of the range model, a formal model of planning processes in music performance (Palmer and Pfordresher, 2003; Pfordresher et al., 2007. Serial ordering errors, in which intended sequence events are produced in incorrect sequence positions, were measured as skilled pianists performed musical pieces that contained excerpts embedded in long or short musical contexts. Pitch errors arose from metrically similar positions and further sequential distances more often when the excerpt was embedded in long contexts compared to short contexts. Musicians’ keystroke intensities and error rates also revealed influences of metrical hierarchies, which differed for performances in long and short contexts. The range model accounted for contextual effects and provided better fits to empirical findings when metrical associations between sequence events were included. Longer sequence contexts may facilitate planning during sequence production by increasing conceptual similarity between hierarchically associated events. These findings are consistent with the notion that neural oscillations at multiple periodicities may strengthen metrical associations across sequence events during planning.

  7. Enhancing photogrammetric 3d city models with procedural modeling techniques for urban planning support

    International Nuclear Information System (INIS)

    Schubiger-Banz, S; Arisona, S M; Zhong, C

    2014-01-01

    This paper presents a workflow to increase the level of detail of reality-based 3D urban models. It combines the established workflows from photogrammetry and procedural modeling in order to exploit distinct advantages of both approaches. The combination has advantages over purely automatic acquisition in terms of visual quality, accuracy and model semantics. Compared to manual modeling, procedural techniques can be much more time effective while maintaining the qualitative properties of the modeled environment. In addition, our method includes processes for procedurally adding additional features such as road and rail networks. The resulting models meet the increasing needs in urban environments for planning, inventory, and analysis

  8. Experiential Learning through Role-Playing: Enhancing Stakeholder Collaboration in Water Safety Plans

    Directory of Open Access Journals (Sweden)

    Giuliana Ferrero

    2018-02-01

    Full Text Available Improved water safety management, as addressed by the Sustainable Development Goals, can be aided by Water Safety Planning, a risk-assessment and risk-management approach introduced by the World Health Organization and implemented to date in 93 countries around the globe. Yet, this approach still encounters some challenges in practice, including that of securing collaboration among the broad range of stakeholders involved. This paper presents a role-playing game designed to foster stakeholder collaboration in Water Safety Plans (WSP. In this role-play, participants take on different stakeholders’ roles during a collective (team-based decision-making process to improve water supply safety in a fictive town. The game is the result of a transdisciplinary initiative aimed at integrating knowledge across technical and governance aspects of WSPs into an active learning experience for water sector actors from diverse backgrounds. It exposes participants to the four phases of Kolb’s experiential learning cycle: concrete experience, reflective observation, conceptualization and active experimentation. This paper discusses potential impacts of the WSP role-play, including skills and knowledge development among participants, which can support cross-sectoral integration and dealing with complexity in decision-making. These are capacity assets strongly needed to address water safety management challenges in a sustainable way.

  9. Wildlife Protection, Mitigation, and Enhancement Planning Phase I, Dworshak Reservoir, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, H. Jerome

    1988-02-01

    Under direction of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, and the subsequent Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, impacts to wildlife due to the development and operation of the US Army Corps of Engineers Dworshak Project have been examined. Using existing information, it has been determined that the project has resulted in the loss of 15,316 acres of elk habitat, 15,286 acres of white-tailed deer habitat, 16,986 acres of black bear habitat, 14,776 acres of ruffed grouse habitat, 13,616 acres of pileated woodpecker habitat, and 66 acres of yellow warbler habitat (scrub-shrub/red alder). Acreages of mallard, Canada goose, river otter, and beaver habitat could not be determined from existing information. The interagency work group has recommended that a HEP (Habitat Evaluation Procedure) be used to determine changes in the quantity and quality of target species habitat in the study area, due to the development and operation of Dworshak Reservoir. 60 refs., 3 figs., 6 tabs.

  10. Enhancing Effective Stakeholder Participation in Local Groundwater Sustainability Planning through Technical Assistance in California

    Science.gov (United States)

    Weintraub, C.; Christian-Smith, J.; Dobbin, K.; Cullen, K.

    2017-12-01

    This presentation will share content from UCS's new publication, Getting Involved in Groundwater; A Guide to Effective Engagement in California's Groundwater Sustainability Plans, as well as lessons learned from collaborating with community organizations to provide technical assistance to Groundwater Sustainability Agency (GSA) board members and stakeholders in the San Joaquin Valley on Groundwater Sustainability Plan (GSP) development. California's Sustainable Groundwater Management Act (SGMA) mandates extensive stakeholder engagement, presenting an opportunity for unincorporated, low-income communities that have historically been affected by but not included in water decisions. However, implementation requires a concerted, thoughtful effort. Through technical assistance and strategic outreach, the Union of Concerned Scientists (UCS) is working to ensure stakeholder engagement in GSP development is robust, diverse, and supported by the best science available. UCS created the GSP stakeholder engagement guide to equip GSA members, scientists and interested community members to meaningfully engage in the GSP development process. The guide serves as a technical primer on SGMA's GSP process and as a resource for understanding groundwater management in California. The guide is just one component of a larger effort to overcome barriers to effective engagement in sustainable groundwater management, especially those presented by technical information. In April, UCS co-hosted a technical assistance workshop for GSA and advisory committee members in Visalia, CA with the Community Water Center (CWC), a local environmental justice non-profit. The workshop was well received and UCS and the CWC were invited to host a second workshop in June. To deepen this engagement and provide one-on-one technical assistance, UCS developed a program to match relevant water experts in the UCS Science Network with GSA members or involved community members in need of specific technical support

  11. Hanford River Protection Project Life cycle Cost Modeling Tool to Enhance Mission Planning - 13396

    International Nuclear Information System (INIS)

    Dunford, Gary; Williams, David; Smith, Rick

    2013-01-01

    The Life cycle Cost Model (LCM) Tool is an overall systems model that incorporates budget, and schedule impacts for the entire life cycle of the River Protection Project (RPP) mission, and is replacing the Hanford Tank Waste Operations Simulator (HTWOS) model as the foundation of the RPP system planning process. Currently, the DOE frequently requests HTWOS simulations of alternative technical and programmatic strategies for completing the RPP mission. Analysis of technical and programmatic changes can be performed with HTWOS; however, life cycle costs and schedules were previously generated by manual transfer of time-based data from HTWOS to Primavera P6. The LCM Tool automates the preparation of life cycle costs and schedules and is needed to provide timely turnaround capability for RPP mission alternative analyses. LCM is the simulation component of the LCM Tool. The simulation component is a replacement of the HTWOS model with new capability to support life cycle cost modeling. It is currently deployed in G22, but has been designed to work in any full object-oriented language with an extensive feature set focused on networking and cross-platform compatibility. The LCM retains existing HTWOS functionality needed to support system planning and alternatives studies going forward. In addition, it incorporates new functionality, coding improvements that streamline programming and model maintenance, and capability to input/export data to/from the LCM using the LCM Database (LCMDB). The LCM Cost/Schedule (LCMCS) contains cost and schedule data and logic. The LCMCS is used to generate life cycle costs and schedules for waste retrieval and processing scenarios. It uses time-based output data from the LCM to produce the logic ties in Primavera P6 necessary for shifting activities. The LCM Tool is evolving to address the needs of decision makers who want to understand the broad spectrum of risks facing complex organizations like DOE-RPP to understand how near

  12. Plan and Some Results of "Advanced Study on Precipitation Enhancement in Arid and Semi-Arid Regions"

    Science.gov (United States)

    Murakami, M.

    2016-12-01

    There are several technologies to secure water resources, including the desalination of seawater, recycling of industrial water and reuse of wastewater. However precipitation enhancement is the only way we can create a large amount of water for industrial use, for example, water for irrigation, provided we find clouds suitable for cloud seeding and apply appropriate and effective methods to increase precipitation. Therefore, rain enhancement research is critical in the quest for new water security options and innovative solutions in the UAE and other arid and semi-arid regions. The main objective of our project is to better evaluate, and ultimately improve, the effectiveness of rain enhancement in the UAE and other arid and semi-arid regions using hygroscopic and glaciogenic seeding techniques. One of the major questions regarding rain enhancement today is the effectiveness of hygroscopic seeding for warm and supercooled convective clouds. Our research will investigate the microphysical processes in seeded and unseeded clouds using a combination of laboratory experiments, numerical simulations and in-situ aircraft measurements in order to decipher the mechanism responsible for precipitation augmentation due to hygroscopic seeding. In our research, major elements of cloud seeding, e.g., assessment of seedability, development of optimal seeding methods and evaluation of seeding effects, will be investigated in the most efficient and realistic way, within three years, using mainly the numerical models with the sophisticated seeding scheme, which is developed on a basis of laboratory experiments and then validated against in-situ and remote sensing observations. In addition to the research plan, the outcomes of the research projects, which will be made available to the public at the end of the project and benefit the broader society, is discussed.

  13. A Planning Study for the Enhancement of National Nuclear Transparency through the Voluntary Contribution to IAEA

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Maeng Ho; Oh, K. B.; Lee, H. M. (and others)

    2006-12-15

    This study investigated the experts' opinions and a case study of typical country in order to enhance international transparency and confidence for national nuclear policy and its activities. And direction and strategies for strengthening cooperation with IAEA through various voluntary contribution into IAEA activities, was also investigated as well as long term strategic road map. It is important to strengthen the nuclear diplomacy in order to increase transparency of Korean nuclear activities through the establishment of nation-wide collaborative systems as well as systematic and long term based implementation of positive measures and actions. At the same time, it is also required to strengthen cooperation with IAEA through voluntary contribution program into relevant IAEA activities as well as establishing national long term strategies and road map.

  14. The Study of Enhancing Plans on Korean Environmental Conservation Value Assessment Map (ECVAM)

    Science.gov (United States)

    Sung, M.; Choi, Y.; Hwang, J.; Jeon, S. W.

    2016-12-01

    With the limitation of land area in the Republic of Korea, land use and excessive development in Korea is one of the huge socio-environmental problems. Plethora of land owners, government, and enterprises to develop land cover are still struggling for maintaining balance between efficient land utilization and sufficient land conservation. For the feasible management and land use in the future, ECVAM(as known as Environmental Conservation Value Assessment Map) was created, accompanied with objective environmental grading of land in South Korea as well as integrated environmental information. ECVAM is the mapping system expressed by five-graded quality whether to develop or conserve in given land area with different colours. This map was primarily produced as the version 1.0 to ultimately use land eco-friendly and thoroughly which contains legally considered grade factors, environmental and ecological factors since 2001. From 2013, this project has planned to renovate the version 2.0 in more precise methods - strengthening legal support for user expansion, more amplified scale to 1:5,000, and the wide-spread supply such as education for those who demands ECVAM to adjust other fields like Environmental Impact Assessment to cope with land developers. For this year, we framed the official guideline to facilitate governments to design their newly-upgraded ECVAM but also to encourage local governors to utilize this figure for given land assessments. This assessment system also include the theoretical concept called natural asset valuation and the base study plan analyzing Vertical Vegetation Profile in the grading element of Stability of Community Structure. For the further study, it needs to reorganize the assessment factors to make the linkage between the ministry of environment and the ministry of land, infrastructure and transport in Korea for sustainable land use as well as to satisfy the grading ones in other nations' environmental conservation assessments such as

  15. Using Plan-Do-Study-Act Cycle to Enhance Completeness of Suicide Firearm Reporting.

    Science.gov (United States)

    Jiang, Yongwen; Young, Shannon; Foss, Karen; Angeloni, Magaly; Norcini, Erica; Viner-Brown, Samara

    2017-02-01

    The Rhode Island Violent Death Reporting System (RIVDRS) collects comprehensive surveillance data on violent deaths to support violence prevention programs in Rhode Island and nationwide. Successful collection of firearm information is critical to understanding gun violence in public health. A recent quality improvement (QI) project was performed to improve gun information collection in the RIVDRS program. Our aim was to increase the presence of firearm model information for 2014 suicides from 50% to 80% by December 31, 2015. We used the 2014 RIVDRS data and the Plan-Do-Study-Act cycle for this project. Our efforts achieved a 50% increase in the number of firearm model reporting. If we work more closely with police departments, they may understand the data importance, and be more likely to include the firearm information in their reports. We describe this process and provide lessons learned that can be generalizable to other states' violent death reporting system. [Full article available at http://rimed.org/rimedicaljournal-2017-02.asp].

  16. HANFORD RIVER PROTECTION PROJECT ENHANCED MISSION PLANNING THROUGH INNOVATIVE TOOLS LIFECYCLE COST MODELING AND AQUEOUS THERMODYNAMIC MODELING - 12134

    Energy Technology Data Exchange (ETDEWEB)

    PIERSON KL; MEINERT FL

    2012-01-26

    Two notable modeling efforts within the Hanford Tank Waste Operations Simulator (HTWOS) are currently underway to (1) increase the robustness of the underlying chemistry approximations through the development and implementation of an aqueous thermodynamic model, and (2) add enhanced planning capabilities to the HTWOS model through development and incorporation of the lifecycle cost model (LCM). Since even seemingly small changes in apparent waste composition or treatment parameters can result in large changes in quantities of high-level waste (HLW) and low-activity waste (LAW) glass, mission duration or lifecycle cost, a solubility model that more accurately depicts the phases and concentrations of constituents in tank waste is required. The LCM enables evaluation of the interactions of proposed changes on lifecycle mission costs, which is critical for decision makers.

  17. A Multi-Year Plan for Enhancing Turbulence Modeling in Hydra-TH Revised and Updated Version 2.0

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Thomas M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Berndt, Markus [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Baglietto, Emilio [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Magolan, Ben [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States)

    2015-10-01

    The purpose of this report is to document a multi-year plan for enhancing turbulence modeling in Hydra-TH for the Consortium for Advanced Simulation of Light Water Reactors (CASL) program. Hydra-TH is being developed to the meet the high- fidelity, high-Reynolds number CFD based thermal hydraulic simulation needs of the program. This work is being conducted within the thermal hydraulics methods (THM) focus area. This report is an extension of THM CASL milestone L3:THM.CFD.P10.02 [33] (March, 2015) and picks up where it left off. It will also serve to meet the requirements of CASL THM level three milestone, L3:THM.CFD.P11.04, scheduled for completion September 30, 2015. The objectives of this plan will be met by: maturation of recently added turbulence models, strategic design/development of new models and systematic and rigorous testing of existing and new models and model extensions. While multi-phase turbulent flow simulations are important to the program, only single-phase modeling will be considered in this report. Large Eddy Simulation (LES) is also an important modeling methodology. However, at least in the first year, the focus is on steady-state Reynolds Averaged Navier-Stokes (RANS) turbulence modeling.

  18. Enhancing Tools and Geospatial Data to Support Operational Forest Management and Regional Forest Planning in the Face of Climate Change

    Science.gov (United States)

    Falkowski, M. J.; Fekety, P.; Hudak, A. T.; Kayastha, N.; Nagel, L. M.

    2014-12-01

    A detailed understanding of how forest composition, structure, and function will be impacted by projected climate change and related adaptive forest management activities are particularly lacking at local scales, where on-the-ground management activities are implemented. Climate sensitive forest dynamics models may prove to be effective tools for developing a comprehensive understanding. However, to be applicable to both regional forest planning and operational forest management, modeling approaches must be capable of simulating forest dynamics across large spatial extents (required for regional planning) while maintaining a high-level of spatial detail (required for operational management). LiDAR remote sensing has shown great utility for operational forest inventory and management, including forest dynamics modeling, albeit across relatively small spatial extents. We present a remote sensing driven approach to spatially initialize a climate-sensitive forest dynamics model (LANDIS-II) in the Pacific Northwest of the US via an integration of airborne LiDAR data with satellite remote sensing data. The system provides detailed forest inventory information - at the landscape level - that is subsequently employed to demonstrate how such models can be used to 1) investigate the potential impacts of climate change on future forest composition and structure, and 2) assess how various forest management practices may either enhance or degrade forest resilience to changing climate and disturbance regimes.

  19. Plans for an Enhanced Terrestrial and Freshwater Environmental Observation Network in South Africa

    Science.gov (United States)

    Everson, C. S.; Bond, W. J.; Moncrieff, G. R.; Everson, T. M.

    2015-12-01

    There is currently little information in South Africa concerning the influence of terrestrial ecosystems on biosphere-atmosphere interactions and their impact on the earth system. Climate modellers require data on energy exchanges between the soil-plant-atmosphere continuum to develop surface models of carbon, energy and water to scale up from the different biomes in South Africa, to regional and, ultimately, global scales. Atmospheric exchanges of South African biomes (ecosystems) are important due to the large and varied pant diversity they represent. The important ecosystem services (including water) delivered by these natural systems and their potential role in the long-term CO2 uptake from the atmosphere and carbon storage is a key gap in South African research. South Africa is already a water-scarce country so the predicted impacts of climate change on water resources are likely to have devastating effects. It is against this diminishing water supply that the South African government must develop innovative investments in water technologies and infrastructure to mitigate the impacts of growing water shortages due to climate change. The Department of Science and Technology of South Africa is planning a multi-million rand investment in long-term ecological infrastructure with a focus on carbon, water and energy. The terrestrial programme will comprise six to seven landscape-scale 'climate change observatories', some in urban and agricultural situations, with eddy covariance flux towers for carbon water and energy measurements, regular remote sensing, for the long-term collection of environmental, ecological and social data. The South African flux network measurement programme aims to become a key role player in the assessment of the consequences of rapid land use change and future impacts of climate change both regionally and internationally. Key words: flux towers, eddy co-variance, carbon, water and energy

  20. Do gravity-related sensory information enable the enhancement of cortical proprioceptive inputs when planning a step in microgravity?

    Directory of Open Access Journals (Sweden)

    Anahid H Saradjian

    Full Text Available We recently found that the cortical response to proprioceptive stimulation was greater when participants were planning a step than when they stood still, and that this sensory facilitation was suppressed in microgravity. The aim of the present study was to test whether the absence of gravity-related sensory afferents during movement planning in microgravity prevented the proprioceptive cortical processing to be enhanced. We reestablished a reference frame in microgravity by providing and translating a horizontal support on which the participants were standing and verified whether this procedure restored the proprioceptive facilitation. The slight translation of the base of support (lateral direction, which occurred prior to step initiation, stimulated at least cutaneous and vestibular receptors. The sensitivity to proprioceptive stimulation was assessed by measuring the amplitude of the cortical somatosensory-evoked potential (SEP, over the Cz electrode following the vibration of the leg muscle. The vibration lasted 1 s and the participants were asked to either initiate a step at the vibration offset or to remain still. We found that the early SEP (90-160 ms was smaller when the platform was translated than when it remained stationary, revealing the existence of an interference phenomenon (i.e., when proprioceptive stimulation is preceded by the stimulation of different sensory modalities evoked by the platform translation. By contrast, the late SEP (550 ms post proprioceptive stimulation onset was greater when the translation preceded the vibration compared to a condition without pre-stimulation (i.e., no translation. This suggests that restoring a body reference system which is impaired in microgravity allowed a greater proprioceptive cortical processing. Importantly, however, the late SEP was similarly increased when participants either produced a step or remained still. We propose that the absence of step-induced facilitation of

  1. The National Library of Medicine's (NLM) Hazardous Substances Data Bank (HSDB): background, recent enhancements and future plans.

    Science.gov (United States)

    Fonger, George Charles; Hakkinen, Pertti; Jordan, Shannon; Publicker, Stephanie

    2014-11-05

    The National Library of Medicine's (NLM) Division of Specialized Information Services (SIS) Toxicology and Environmental Health Information Program is responsible for the management of the online Hazardous Substances Data Bank (HSDB). HSDB, a part of NLM's Toxicology Data Network (TOXNET(®)), is a file of chemical/substance information with one record for each specific chemical or substance, or for a category of chemicals or substances. Like the rest of TOXNET's databases and other resources, HSDB is available online at no cost to global users. HSDB has approximately 5600 chemicals and substances, with a focus on toxicology information and also on human exposure, industrial hygiene, emergency handling procedures, environmental fate, regulatory requirements, and related areas of likely interest to HSDB users. All data are from a core set of books, government documents, technical reports, selected primary journal literature, and other online sources of information, with a goal of linking the HSDB content to as much publicly available information as possible. HSDB's content is peer-reviewed by the Scientific Review Panel, a group of experts in the areas covering the scope of HSDB content. Recent enhancements include the addition of chemical structures to HSDB records, the addition of new subfields such as age groups for human data, more occupational exposure standards, and the addition of information on numerous nanomaterials. Examples of future plans include providing more exposure-related information, e.g., uses of a chemical or substance in consumer products; the addition of information summaries aimed towards consumers and other members of the public wanting to learn about a chemical or substance; more visual content such as diagrams (images) of the pathways of metabolism of a substance; and enhanced search features and navigation. Published by Elsevier Ireland Ltd.

  2. A study on human performance enhancement plan in maintenance field by survey on actual condition of human performance tools - 15035

    International Nuclear Information System (INIS)

    Park, J.; Jeong, H.; Kim, Y.

    2015-01-01

    Human errors in nuclear power plant are one of the important factors that may cause reactor trip. Most operating companies of nuclear power plants manage human factor systematically through tools like HPES (Human Performance Enhancement), PSR (Periodic Safety Review), OE (Operating Experience), human performance tools, safety culture assessment and CAP (Corrective Action Program). But human factors are managed passively in maintenance field, because maintenance works are carrying out by partner companies. KHNP also contracts the maintenance work to the partner companies, and advise them to use human performance tools. But the actual condition on partner companies has not been surveyed. This paper suggests some plans that can improve human performance by analyzing the opinion of partner company employees about the causes and solutions of human errors, by analyzing utilization of human performance tools and by comparing the results of the partner companies survey with the results of the operating company survey. The survey is conducted to 3 partner companies by similar contents and categories in order to compare partner company with operating company, and the main analysis fields are the following: -1) Level of understanding and utilization of the human performance tools, -2) Difficulties of applying the human performance tools, -3) Level of employee's training (or education) in the use of the human performance tools, and -4) Root causes of human errors and countermeasures. (authors)

  3. Kootenai River Wildlife Habitat Enhancement Project : Long-term Bighorn Sheep/Mule Deer Winter and Spring Habitat Improvement Project : Wildlife Mitigation Project, Libby Dam, Montana : Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Yde, Chis

    1990-06-01

    The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer winter and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.

  4. Enhanced Chemical Incident Response Plan (ECIRP). Appendix F, remediation analysis with Decision Support Tools (DSTs) for wide-area chemical hazards.

    Energy Technology Data Exchange (ETDEWEB)

    Hassig, Nancy L. (Pacific Northwest National Laboratory, Richland, WA); Pulsipher, Brent A. (Pacific Northwest National Laboratory, Richland, WA); Foltz, Greg W.; Hoette, Trisha Marie

    2011-07-01

    The Defense Threat Reduction Agency (DTRA) commissioned an assessment of the Consequence Management (CM) plans in place on military bases for response to a chemical attack. The effectiveness of the CM plans for recovering from chemical incidents was modeled using a multiple Decision Support Tools (DSTs). First, a scenario was developed based on an aerial dispersion of a chemical agent over a wide-area of land. The extent of contamination was modeled with the Hazard Prediction and Assessment Capability (HPAC) tool. Subsequently, the Analyzer for Wide Area Restoration Effectiveness (AWARE) tool was used to estimate the cost and time demands for remediation based on input of contamination maps, sampling and decontamination resources, strategies, rates and costs. The sampling strategies incorporated in the calculation were designed using the Visual Sample Plan (VSP) tool. Based on a gaps assessment and the DST remediation analysis, an Enhanced Chemical Incident Response Plan (ECIRP) was developed.

  5. Shifting Resources and Focus to Meet the Goals of the National HIV/AIDS Strategy: The Enhanced Comprehensive HIV Prevention Planning Project, 2010–2013

    Science.gov (United States)

    Purcell, David W.; Fisher, Holly H.; Belcher, Lisa; Carey, James W.; Courtenay-Quirk, Cari; Dunbar, Erica; Eke, Agatha N.; Galindo, Carla A.; Glassman, Marlene; Margolis, Andrew D.; Neumann, Mary Spink; Prather, Cynthia; Stratford, Dale; Taylor, Raekiela D.; Mermin, Jonathan

    2016-01-01

    In September 2010, CDC launched the Enhanced Comprehensive HIV Prevention Planning (ECHPP) project to shift HIV-related activities to meet goals of the 2010 National HIV/AIDS Strategy (NHAS). Twelve health departments in cities with high AIDS burden participated. These 12 grantees submitted plans detailing jurisdiction-level goals, strategies, and objectives for HIV prevention and care activities. We reviewed plans to identify themes in the planning process and initial implementation. Planning themes included data integration, broad engagement of partners, and resource allocation modeling. Implementation themes included organizational change, building partnerships, enhancing data use, developing protocols and policies, and providing training and technical assistance for new and expanded activities. Pilot programs also allowed grantees to assess the feasibility of large-scale implementation. These findings indicate that health departments in areas hardest hit by HIV are shifting their HIV prevention and care programs to increase local impact. Examples from ECHPP will be of interest to other health departments as they work toward meeting the NHAS goals. PMID:26843670

  6. Nursing care plans versus concept maps in the enhancement of critical thinking skills in nursing students enrolled in a baccalaureate nursing program.

    Science.gov (United States)

    Sinatra-Wilhelm, Tina

    2012-01-01

    Appropriate and effective critical thinking and problem solving is necessary for all nurses in order to make complex decisions that improve patient outcomes, safety, and quality of nursing care. With the current emphasis on quality improvement, critical thinking ability is a noteworthy concern within the nursing profession. An in-depth review of literature related to critical thinking was performed. The use of nursing care plans and concept mapping to improve critical thinking skills was among the recommendations identified. This study compares the use of nursing care plans and concept mapping as a teaching strategy for the enhancement of critical thinking skills in baccalaureate level nursing students. The California Critical Thinking Skills Test was used as a method of comparison and evaluation. Results indicate that concept mapping enhances critical thinking skills in baccalaureate nursing students.

  7. Enhancing public participation in natural resource management using Soft OR - an application of strategic option development and analysis in tactical forest planning

    DEFF Research Database (Denmark)

    Hjortsø, Carsten Nico Portefée

    2004-01-01

    , communication of stakeholder perspectives, identification and management of conflicts, decision process transparency, and agency accountability for final planning outcomes. The primary problems encountered relate to the difficulty of reading the cognitive maps, time requirements, and selection of facilitator......This article presents a case study where a modified version of strategic option development and analysis (SODA) is applied to enhance the level of citizens’ participation in a strategic forest management planning process managed by the Danish Forest and Nature Agency. The case is interesting...... because of structural differences between traditional Soft OR and public participation settings. Research shows that SODA can nevertheless improve public involvement in several ways, including stakeholders’ perception of being involved, stakeholders’ commitment, structuring of the planning context...

  8. The Application of Strategic Planning Tools for Enhanced Palliative Care Services at the Minneapolis Veterans Affairs Medical Center

    National Research Council Canada - National Science Library

    Mylan, Marci M

    2005-01-01

    .... Using selected strategic planning tools, the study examined the gaps in services by gathering staff opinions, examining local statistics regarding end-of-life care, and looking at community and national trends...

  9. Enhancing Survivorship Care Planning for Patients With Localized Prostate Cancer Using a Couple-Focused mHealth Symptom Self-Management Program: Protocol for a Feasibility Study.

    Science.gov (United States)

    Song, Lixin; Dunlap, Kaitlyn L; Tan, Xianming; Chen, Ronald C; Nielsen, Matthew E; Rabenberg, Rebecca L; Asafu-Adjei, Josephine K; Koontz, Bridget F; Birken, Sarah A; Northouse, Laurel L; Mayer, Deborah K

    2018-02-26

    This project explores a new model of care that enhances survivorship care planning and promotes health for men with localized prostate cancer transitioning to posttreatment self-management. Survivorship care planning is important for patients with prostate cancer because of its high incidence rate in the United States, the frequent occurrence of treatment-related side effects, and reduced quality of life (QOL) for both men and their partners. A key component of comprehensive survivorship care planning is survivorship care plans (SCPs), documents that summarize cancer diagnosis, treatment, and plans for follow-up care. However, research concerning the effectiveness of SCPs on patient outcomes or health service use has thus far been inconclusive. SCPs that are tailored to individual patients' needs for information and care may improve effectiveness. This study aims to examine the feasibility of an enhanced survivorship care plan (ESCP) that integrates a symptom self-management mHealth program called Prostate Cancer Education and Resources for Couples (PERC) into the existing standardized SCP. The specific aims are to (1) examine the feasibility of delivering ESCPs and (2) to estimate the magnitude of benefit of ESCPs. We will use a two-group randomized controlled pretest-posttest design and collect data at baseline (T1) and 4 months later (T2) among 50 patients completing initial treatment for localized prostate cancer and their partners. First, we will assess the feasibility of ESCP by recruitment, enrollment, and retention rates; program satisfaction with the ESCP; and perceived ease of use of the ESCP. To achieve the secondary aim, we will compare the ESCP users with the standardized SCP users and assess their primary outcomes of QOL (overall, physical, emotional, and social QOL); secondary outcomes (reduction in negative appraisals and improvement in self-efficacy, social support, and health behaviors to manage symptoms); and number of visits to posttreatment

  10. Enhancing Use of Learning Sciences Research in Planning for and Supporting Educational Change: Leveraging and Building Social Networks

    Science.gov (United States)

    Penuel, William R.; Bell, Philip; Bevan, Bronwyn; Buffington, Pam; Falk, Joni

    2016-01-01

    This paper explores practical ways to engage two areas of educational scholarship--research on science learning and research on social networks--to inform efforts to plan and support implementation of new standards. The standards, the "Next Generation Science Standards" (NGSS; NGSS Lead States in Next generation science standards: For…

  11. 76 FR 36955 - West Los Angeles VA Medical Center Veterans Programs Enhancement Act of 1998; Master Plan

    Science.gov (United States)

    2011-06-23

    ... over the next 50 years.'' This is a land use plan that guides the physical development of the campus to... Development (HUD) Section 8 permanent housing vouchers (940), and community residential beds for veterans with... homeless veterans, especially those coping with mental health problems such as PTSD. The WLA campus is a...

  12. Family Planning and AIDS/HIV Intervention from a Cross-Cultural Perspective: Enhancing the Pharmacist's Role.

    Science.gov (United States)

    Day, Randal D.; And Others

    1993-01-01

    A study compared perceptions of pharmacy students in three different cultures (Malaysia, Thailand, United States) concerning pharmacist counseling about contraceptive use for family planning and AIDS prevention. Results indicate students in each culture, by gender, had different comfort levels with such counseling, implying need for different…

  13. SU-F-J-71: Improving CT Quality for Radiation Therapy Planning and Delivery Guidance Using a Non-Linear Contrast Enhancement Technique

    Energy Technology Data Exchange (ETDEWEB)

    Noid, G; Tai, A; Li, X [Medical College of Wisconsin, Milwaukee, WI (United States)

    2016-06-15

    Purpose: Advanced image post-processing techniques which enhance soft-tissue contrast in CT have not been widely employed for RT planning or delivery guidance. The purpose of this work is to assess the soft-tissue contrast enhancement from non-linear contrast enhancing filters and its impact in RT. The contrast enhancement reduces patient alignment uncertainties. Methods: Non-linear contrast enhancing methods, such as Best Contrast (Siemens), amplify small differences in X-ray attenuation between two adjacent structure without significantly increasing noise. Best Contrast (BC) separates a CT into two frequency bands. The low frequency band is modified by a non-linear scaling function before recombination with the high frequency band. CT data collected using a CT-on-rails (Definition AS Open, Siemens) during daily CT-guided RT for 6 prostate cancer patients and an image quality phantom (The Phantom Laboratory) were analyzed. Images acquired with a standard protocol (120 kVp, 0.6 pitch, 18 mGy CTDIvol) were processed before comparison to the unaltered images. Contrast and noise were measured in the the phantom. Inter-observer variation was assessed by placing prostate contours on the 12 CT study sets, 6 enhanced and 6 unaltered, in a blinded study involving 8 observers. Results: The phantom data demonstrate that BC increased the contrast between the 1.0% supra-slice element and the background substrate by 46.5 HU while noise increased by only 2.3 HU. Thus the contrast to noise ratio increased from 1.28 to 6.71. Furthermore, the variation in centroid position of the prostate contours was decreased from 1.3±0.4 mm to 0.8±0.3 mm. Thus the CTV-to-PTV margin was reduced by 1.1 mm. The uncertainty in delineation of the prostate/rectum edge decreased by 0.5 mm. Conclusion: As demonstrated in phantom and patient scans the BC filter accentuates soft-tissue contrast. This enhancement leads to reduced inter-observer variation, which should improve RT planning and delivery

  14. Critical Thinking Skills and Academic Maturity: Emerging Results from a Five-Year Quality Enhancement Plan (QEP) Study

    Science.gov (United States)

    Toppin, Ian N.; Chitsonga, Shadreck

    2016-01-01

    The QEP that was implemented in this study focused on enhancing students' critical thinking skills. A pretest/posttest approach was used to assess students' critical thinking progress in freshman level core English and Math courses. An intervention was performed involving intensive instruction and assignments relating to a set of reasoning…

  15. A brief motivational interview with action and coping planning components enhances motivational autonomy among volunteer blood donors.

    Science.gov (United States)

    France, Christopher R; France, Janis L; Carlson, Bruce W; Kessler, Debra A; Rebosa, Mark; Shaz, Beth H; Madden, Katrala; Carey, Patricia M; Fox, Kristen R; Livitz, Irina E; Ankawi, Brett; Slepian, P Maxwell

    2016-06-01

    In contrast to standard donor retention strategies (e.g., mailings, phone calls, text messages), we developed a brief telephone interview, based on motivational interviewing principles, that encourages blood donors to reflect upon their unique motivators and barriers for giving. This study examined the effect of this motivational interview, combined with action and coping plan components, on blood donor motivations. The design was to randomly assign blood donors to receive either a telephone-delivered motivational interview with action and coping plan components or a control call approximately 6 weeks after their most recent donation. Participants completed a series of surveys related to donation motivation approximately 3 weeks before telephone contact (precall baseline) and then repeated these surveys approximately 1 week after telephone contact (postcall). The sample was 63% female, included a majority (52.6%) of first-time blood donors, and had a mean age of 30.0 years (SD, 11.7 years). A series of analyses of variance revealed that, relative to controls (n = 244), donors in the motivational interview group (n = 254) had significantly larger increases in motivational autonomy (p = 0.001), affective attitude (p = 0.004), self-efficacy (p = 0.03), anticipated regret (p = 0.001), and intention (p = motivational interviewing with action and coping planning as a novel strategy to promote key contributors to donor motivation. © 2016 AABB.

  16. Formal plan for self-disclosure enhances supported employment outcomes among young people with severe mental illness.

    Science.gov (United States)

    McGahey, Ellie; Waghorn, Geoffrey; Lloyd, Chris; Morrissey, Shirley; Williams, Philip Lee

    2016-04-01

    Young people with mental illness experience high levels of unemployment, which can be related to stigma and discrimination. This may result from poor choices in disclosing personal information, such as their mental illness diagnosis, in the workplace. The aim of this study was to investigate the predictive validity of a formal plan to manage personal information (PMPI) during the early stages of supported employment. The focal question was: does the use of a brief structured PMPI lead to more employment outcomes for young people with a mental illness? A sample of 40 young unemployed mental health service users (mean age 23.9 years), who were also attending employment services on the Gold Coast, was asked about their disclosure preferences. If they preferred not to disclose at all, they did not complete a plan for managing personal information. If they preferred to disclose some personal information, they were provided with assistance to complete a PMPI. Baseline information was gathered from two equal groups of 20 individuals. Employment status was ascertained at a 6-week follow-up interview. Those who completed a plan to manage their personal information had 4.9 times greater odds of employment at 6 weeks than those who preferred not to disclose any personal information. A formal PMPI has promising predictive validity with respect to job seekers not opposed to pragmatic forms of self-disclosure. Further research is needed to examine other properties of this decision-making tool. © 2014 Wiley Publishing Asia Pty Ltd.

  17. Formal and Informal Planning Instruments as Catalyst for Urban Attractiveness. Enhancing Town Attractiveness in the Land of Beiuş, Romania

    Directory of Open Access Journals (Sweden)

    PAUL EMIL OLĂU

    2014-06-01

    Full Text Available We are once again witnessing a directional change in urban studies. This simple and concise statement comes out from a brief analysis of both the latest interests of different scholars and the discourses of urban, regional, and governmental actors. The change we are talking about refers to a slight interest drop in environmental issues and an ever-increasing attention paid to the economic and social aspects of urban life. The conceptual shift from sustainable development to smart growth is a good example, and the fact that the recent European Union papers (EU 2020 strategy, EU Cohesion Policy 2014-2020 have adopted it ensures its liability. Coming to urban planning, which is primarily conceived as sets of regulatory measures, one can notice that in order to achieve the latest standards it has to develop and implement new methods and instruments which will eventually lead to smart, sustainable and inclusive growth. Knowing that urban plans look to specific urban issues as zoning, layout and design, which are usually regulated by legally approved national guidelines, this new tasks fall into the charge of informal planning. In Romania, informal planning refers to local development strategies, local action plans as well as the Local Agenda 21, which was implemented throughout the world. Admitting that municipalities worldwide are in a sharp competition for inhabitants, investors and capital (from trade, tourism, exhibitions, etc., we realize that small and medium-sized towns have to ensure that all of their valuable characteristics are as visible and as marketable as possible. In order to do this, they have to enhance their attractiveness through different actions, using different methods and instruments. The present paper highlights the ways that local actors in four small cities in Bihor County, Romania are trying to market their municipalities. The chosen cities organically fit into one of the most representative mental space in Romania, the

  18. Distributed Generation Planning using Peer Enhanced Multi-objective Teaching-Learning based Optimization in Distribution Networks

    Science.gov (United States)

    Selvam, Kayalvizhi; Vinod Kumar, D. M.; Siripuram, Ramakanth

    2017-04-01

    In this paper, an optimization technique called peer enhanced teaching learning based optimization (PeTLBO) algorithm is used in multi-objective problem domain. The PeTLBO algorithm is parameter less so it reduced the computational burden. The proposed peer enhanced multi-objective based TLBO (PeMOTLBO) algorithm has been utilized to find a set of non-dominated optimal solutions [distributed generation (DG) location and sizing in distribution network]. The objectives considered are: real power loss and the voltage deviation subjected to voltage limits and maximum penetration level of DG in distribution network. Since the DG considered is capable of injecting real and reactive power to the distribution network the power factor is considered as 0.85 lead. The proposed peer enhanced multi-objective optimization technique provides different trade-off solutions in order to find the best compromise solution a fuzzy set theory approach has been used. The effectiveness of this proposed PeMOTLBO is tested on IEEE 33-bus and Indian 85-bus distribution system. The performance is validated with Pareto fronts and two performance metrics (C-metric and S-metric) by comparing with robust multi-objective technique called non-dominated sorting genetic algorithm-II and also with the basic TLBO.

  19. The role of contrast-enhanced ultrasound in planning treatment protocols for hepatocellular carcinoma before radiofrequency ablation

    Energy Technology Data Exchange (ETDEWEB)

    Chen, M.H. [Ultrasound Department, School of Oncology, Peking University, Hai Dian District, Beijing 100036 (China)]. E-mail: minhuachen@vip.sina.com; Yang, W. [Ultrasound Department, School of Oncology, Peking University, Hai Dian District, Beijing 100036 (China); Yan, K. [Ultrasound Department, School of Oncology, Peking University, Hai Dian District, Beijing 100036 (China); Dai, Y. [Ultrasound Department, School of Oncology, Peking University, Hai Dian District, Beijing 100036 (China); Wu, W. [Ultrasound Department, School of Oncology, Peking University, Hai Dian District, Beijing 100036 (China); Fan, Z.H. [Ultrasound Department, School of Oncology, Peking University, Hai Dian District, Beijing 100036 (China); Callstrom, M.R. [Mayo Clinic College of Medicine, Rochester, MN 55905 (United States); Charboneau, J.W. [Mayo Clinic College of Medicine, Rochester, MN 55905 (United States)

    2007-08-15

    Aim: To evaluate the clinical value of contrast-enhanced ultrasound (CEUS) for patients with hepatocellular carcinoma (HCC) in identifying the tumour number, ablation range and feeding vessels before ultrasound-guided radiofrequency ablation (RFA), and to compare the efficacy of RFA after CEUS with the efficacy of RFA after non-enhanced ultrasonography (US) without contrast medium administration. Materials and methods: From 2002 to 2005, 81 patients with 110 HCCs underwent CEUS with SonoVue before RFA treatment (group A). Eighty six patients with 112 HCCs who underwent US without contrast enhancement before RFA served as the control group (group B). The average diameters of the lesions in group A and group B were 3.6 {+-} 1.1 cm and 3.5 {+-} 1.1 cm, respectively. There were no significant differences in clinical data between the two groups. Regular follow-up after treatment was performed using contrast-enhanced computed tomography (CECT). After treatment, complete necrosis was defined as the absence of viable tissue in treated tumours at the 1-year follow-up CECT. Results: Using CEUS an additional seven small lesions ({<=}2.0 cm) were found compared with those found using CECT and conventional US. CEUS showed that 56.4% of lesions (62/110 tumours) were larger in size and 49.1% (54/110 tumours) became more irregular in shape during the arterial phase than on conventional US. Feeding vessels were detected using CEUS in 52 (91.2%) of 57 lesions that were larger than 3.5 cm. The follow-up period was at least 1 year for each case. The complete tumour necrosis rate in group A was significantly higher than that in group B (92.2% versus 83.0%; p = 0.036). Conclusion: CEUS can be used to more accurately define the size and contour of lesions, and to detect additional small or satellite lesions and the feeding vessel of HCC tumours. CEUS provided important information for designing the ablation protocol, and might improve the efficacy of RFA.

  20. Comparison of two group counseling approaches to enhancing confidence in planning careers by undecided Taiwanese college women.

    Science.gov (United States)

    Peng, H

    2000-10-01

    This is a report of research comparing two approaches to enhance the career confidence of undecided female college students. 30 women who requested enrollment in career counseling were assigned to two counseling groups (a cognitive reconstructing intervention group and a career decision-making skills training group) and one no-treatment control group based on time of request. After participating in the two career counseling groups for eight sessions in a month, the female college students rated their mean confidence as increased over that of the no-treatment group. Analysis indicated that the indecisive female college students benefitted from career group counseling with an emphasis on self-efficacy and that the cognitive reconstructing intervention was more effective.

  1. An enhanced reliability-oriented workforce planning model for process industry using combined fuzzy goal programming and differential evolution approach

    Science.gov (United States)

    Ighravwe, D. E.; Oke, S. A.; Adebiyi, K. A.

    2018-03-01

    This paper draws on the "human reliability" concept as a structure for gaining insight into the maintenance workforce assessment in a process industry. Human reliability hinges on developing the reliability of humans to a threshold that guides the maintenance workforce to execute accurate decisions within the limits of resources and time allocations. This concept offers a worthwhile point of deviation to encompass three elegant adjustments to literature model in terms of maintenance time, workforce performance and return-on-workforce investments. These fully explain the results of our influence. The presented structure breaks new grounds in maintenance workforce theory and practice from a number of perspectives. First, we have successfully implemented fuzzy goal programming (FGP) and differential evolution (DE) techniques for the solution of optimisation problem in maintenance of a process plant for the first time. The results obtained in this work showed better quality of solution from the DE algorithm compared with those of genetic algorithm and particle swarm optimisation algorithm, thus expressing superiority of the proposed procedure over them. Second, the analytical discourse, which was framed on stochastic theory, focusing on specific application to a process plant in Nigeria is a novelty. The work provides more insights into maintenance workforce planning during overhaul rework and overtime maintenance activities in manufacturing systems and demonstrated capacity in generating substantially helpful information for practice.

  2. Health Department HIV Prevention Programs That Support the National HIV/AIDS Strategy: The Enhanced Comprehensive HIV Prevention Planning Project, 2010-2013.

    Science.gov (United States)

    Fisher, Holly H; Hoyte, Tamika; Purcell, David W; Van Handel, Michelle; Williams, Weston; Krueger, Amy; Dietz, Patricia; Stratford, Dale; Heitgerd, Janet; Dunbar, Erica; Wan, Choi; Linley, Laurie A; Flores, Stephen A

    2016-01-01

    The Enhanced Comprehensive HIV Prevention Planning project was the first initiative of the Centers for Disease Control and Prevention (CDC) to address the goals of the National HIV/AIDS Strategy (NHAS). Health departments in 12 U.S. cities with a high prevalence of AIDS conducted comprehensive program planning and implemented cost-effective, scalable HIV prevention interventions that targeted high-risk populations. We examined trends in health department HIV prevention programs in these cities during the project. We analyzed the number of people who received partner services, condoms distributed, and people tested for HIV, as well as funding allocations for selected HIV prevention programs by year and by site from October 2010 through September 2013. We assessed trends in the proportional change in services and allocations during the project period using generalized estimating equations. We also conducted thematic coding of program activities that targeted people living with HIV infection (PLWH). We found significant increases in funding allocations for HIV testing and condom distribution. All HIV partner services indicators, condom distribution, and HIV testing of African American and Hispanic/Latino populations significantly increased. HIV tests associated with a new diagnosis increased significantly among those self-identifying as Hispanic/Latino but significantly decreased among African Americans. For programs targeting PLWH, health department activities included implementing new program models, improving local data use, and building local capacity to enhance linkage to HIV medical care, retention in care, and treatment adherence. Overall, these findings indicate that health departments in areas with a high burden of AIDS successfully shifted their HIV prevention resources to scale up important HIV programs and make progress toward NHAS goals.

  3. Internet plan and planning

    Directory of Open Access Journals (Sweden)

    Kahriman Emina

    2008-01-01

    Full Text Available Paper discuss specific features of internet plan as well as planning as management process in general in the contemporary environment. No need to stress out that marketing plan and marketing planning is core activity in approaching to market. At the same time, there are a lot specific c request in preparing marketing plan comparing to business planning due to marketing plan is an essential part. The importance of internet plan and planning rely on specific features of the internet network but as a part of general corporate as well as marketing strategy.

  4. Competency build up, sustained performance enhancement of human resource through effective man power planning, training and proper safety culture and organizational climate

    International Nuclear Information System (INIS)

    Jha, B.D.; Goyal, O.P.

    2006-01-01

    Human resource competence building and continued enhancement of performance is the most vital input for safe and reliable operations of a Nuclear Power Plant. Integrated planning leading to the decision of timely selection of optimum number of fresh people and deployment of experienced manpower with desired lead time is inevitable to achieve the above objective. For safe and reliable plant operation human performance analysis followed by suggestive measures to improve the same is needed. Corrective or strengthening input may be in terms of training, work environment, motivations, organizational culture and climate, leadership and prevailing environmental force and bio-rhythm of individuals with critical days are to be worked out The adequacy in training and development not only gives safe and reliable plant operations but results in greater employee satisfaction and self esteem as well. As of date, in the present vibrant global scenario, only the organization which impart good training in addition to competitive pay and perks to their employees are able to attract good people. Indian nuclear power plant in general and TAPP 3 and 4 in particular has been referred. (author)

  5. Connected vehicle impacts on transportation planning analysis of the need for new and enhanced analysis tools, techniques and data : Highway Capacity Manual briefing.

    Science.gov (United States)

    2016-03-02

    The principal objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should be considered across the range of transportation planning processes and products developed...

  6. Pacific-Australia Climate Change Science and Adaptation Planning program: supporting climate science and enhancing climate services in Pacific Island Countries

    Science.gov (United States)

    Kuleshov, Yuriy; Jones, David; Hendon, Harry; Charles, Andrew; Shelton, Kay; de Wit, Roald; Cottrill, Andrew; Nakaegawa, Toshiyuki; Atalifo, Terry; Prakash, Bipendra; Seuseu, Sunny; Kaniaha, Salesa

    2013-04-01

    predictive skill of POAMA is consistently higher than skill of statistical-based method. Presently, under the Pacific-Australia Climate Change Science and Adaptation Planning (PACCSAP) program, we are developing dynamical model-based seasonal climate prediction for climate extremes. Of particular concern are tropical cyclones which are the most destructive weather systems that impact on coastal areas of Australia and Pacific Island Countries. To analyse historical cyclone data, we developed a consolidate archive for the Southern Hemisphere and North-Western Pacific (http://www.bom.gov.au/cyclone/history/tracks/). Using dynamical climate models (POAMA and Japan Meteorological Agency's model), we work on improving accuracy of seasonal forecasts of tropical cyclone activity for the regions of Western Pacific. Improved seasonal climate prediction based on dynamical models will further enhance climate services in Australia and Pacific Island Countries.

  7. A clinical nurse specialist-led intervention to enhance medication adherence using the plan-do-check-act cycle for continuous self-improvement.

    Science.gov (United States)

    Russell, Cynthia L

    2010-01-01

    A clinical nurse specialist-led intervention to improve medication adherence in chronically ill adults using renal transplant recipients as an exemplar population is proposed. Meta-analyses and systematic reviews of chronically ill and transplant patients indicate that patient-specific characteristics not only are poor and inconsistent predictors for medication nonadherence but also are not amenable to intervention. Adherence has not meaningfully improved, despite meta-analyses and systematic narrative reviews of randomized controlled trials (RCTs) dealing with medication nonadherence in acutely and chronically ill persons and RCTs dealing with transplant patients. Interventions with a superior potential to enhance medication adherence must be developed. Use of a clinical nurse specialist-led continuous self-improvement intervention with adult renal transplant recipients is proposed. Continuous self-improvement focuses on improving personal systems thinking and behavior using the plan-do-check-act process. Electronic medication monitoring reports, one of several objective measures of medication adherence, are used by the clinician to provide patient feedback during the check process on medication-taking patterns. Continuous self-improvement as an intervention holds promise in supporting patient self-management and diminishing the blame that clinicians place on patients for medication nonadherence. Using an objective measure of medication adherence such as an electronic monitoring report fosters collaborative patient-clinician discussions of daily medication-taking patterns. Through collaboration, ideas for improving medication taking can be explored. Changes can be followed and evaluated for effectiveness through the continuous self-improvement process. Future studies should include RCTs comparing educational and/or behavioral interventions to improve medication adherence.

  8. Planning and Resource Allocation Management.

    Science.gov (United States)

    Coleman, Jack W.

    1986-01-01

    Modern scientific management techniques provide college administrators with valuable planning and resource allocation insights and enhances the decision process. The planning model should incorporate assessment, strategic planning, dynamic and long-term budgeting, operational planning, and feedback and control for actual operations. (MSE)

  9. Using Program Data to Improve Access to Family Planning and Enhance the Method Mix in Conflict-Affected Areas of the Democratic Republic of the Congo.

    Science.gov (United States)

    Ho, Lara S; Wheeler, Erin

    2018-03-21

    Unmet need for family planning in the conflict-affected area of eastern Democratic Republic of the Congo (DRC) has been reported to be as high as 38%, and women in such conflict settings are often the most at risk for maternal mortality. The International Rescue Committee implements the Family Planning and Post-Abortion Care in Emergencies program in 3 provinces of eastern DRC to provide women and couples access to family planning, including long-acting reversible contraceptives (LARCs). This article presents routine program data from June 2011 through December 2013 from 2 health zones as well as results from a qualitative assessment of family planning clients and of male and female non-users, conducted in 2013. It then describes how these findings were used to make program adjustments to improve access to family planning services and client informed choice and assesses the effects of the program design changes on family planning uptake and method mix using routine program data from January 2014 through December 2016. Between 2011 and 2013, 8,985 clients adopted family planning, with an average 14 clients adopting a method per facility, per month. The method mix remained stable during this period, with implants dominating at 48%. Barriers to uptake identified from the qualitative research were both supply- and demand-related, including misconceptions about certain modern contraceptive methods on the part of providers, users, and other community members. The program implemented several program changes based on the assessment findings, including clinical coaching and supportive supervision to improve provider skills and attitudes, introduction of immediate postpartum insertion of the intrauterine device (IUD) and the levonorgestrel-releasing intrauterine system (LNG-IUS), and behavior change communication campaigns to raise awareness about family planning. After these program changes, the mean number of clients adopting modern family planning per facility, per month

  10. Learning Through Scenario Planning

    DEFF Research Database (Denmark)

    Balarezo, Jose

    This project investigates the uses and effects of scenario planning in companies operating in highly uncertain and dynamic environments. Whereas previous research on scenario planning has fallen short of providing sufficient evidence of its mechanisms and effects on individual or organizational l...... theoretical understanding of scenario planning while simultaneously presenting a more nuanced account of the individual behaviors and social dynamics underpinning organizational learning.......This project investigates the uses and effects of scenario planning in companies operating in highly uncertain and dynamic environments. Whereas previous research on scenario planning has fallen short of providing sufficient evidence of its mechanisms and effects on individual or organizational...... level variables, this research corrects this void by investigating the dynamics of organizational learning through the lenses of a corporate scenario planning process. This enhances our scientific understanding of the role that scenario planning might play in the context of organizational learning...

  11. Educational Research: Planning, Conducting, and Evaluating Quantitative and Qualitative Research, Enhanced Pearson eText with Loose-Leaf Version--Access Card Package. Fifth Edition

    Science.gov (United States)

    Creswell, John W.

    2015-01-01

    "Educational Research: Planning, Conducting, and Evaluating Quantitative and Qualitative Research" offers a truly balanced, inclusive, and integrated overview of the processes involved in educational research. This text first examines the general steps in the research process and then details the procedures for conducting specific types…

  12. Automation of the Marine Corps Planning Process

    Science.gov (United States)

    2014-06-01

    Continuance Model EOU ease of use EPLRS Enhanced Position Location and Reporting System ESGPP ESG Planning Process FA field artillery FRAGO...planning processes like MCPP, MEU/ARG Planning Process (MEU/ARG PP), Army Planning Process (the MDMP) and the ESG Planning Process (ESGPP) (PAE Manual

  13. Strategic Planning with Critical Success Factors and Future Scenarios: An Integrated Strategic Planning Framework

    Science.gov (United States)

    2010-11-01

    four years. The report synthesizes docu- mented theory and research in strategic planning, CSFs, and scenarios and provides insights and lessons...and scenario planning. It synthesizes documented theory and re- search in strategic planning, CSFs, and future scenarios. It proposes an enhanced...enhancing typical strategic planning with the critical success factor (CSF) method and future scenarios. It synthesizes documented theory and

  14. Enhanced Preoperative Deep Inferior Epigastric Artery Perforator Flap Planning with a 3D-Printed Perforasome Template: Technique and Case Report

    Directory of Open Access Journals (Sweden)

    Michael P. Chae, MBBS, BMedSc

    2018-01-01

    Full Text Available Summary:. Optimizing preoperative planning is widely sought in deep inferior epigastric artery perforator (DIEP flap surgery. One reason for this is that rates of fat necrosis remain relatively high (up to 35%, and that adjusting flap design by an improved understanding of individual perforasomes and perfusion characteristics may be useful in reducing the risk of fat necrosis. Imaging techniques have substantially improved over the past decade, and with recent advances in 3D printing, an improved demonstration of imaged anatomy has become available. We describe a 3D-printed template that can be used preoperatively to mark out a patient’s individualized perforasome for flap planning in DIEP flap surgery. We describe this “perforasome template” technique in a case of a 46-year-old woman undergoing immediate unilateral breast reconstruction with a DIEP flap. Routine preoperative computed tomographic angiography was performed, with open-source software (3D Slicer, Autodesk MeshMixer and Cura and a desktop 3D printer (Ultimaker 3E used to create a template used to mark intra-flap, subcutaneous branches of deep inferior epigastric artery (DIEA perforators on the abdomen. An individualized 3D printed template was used to estimate the size and boundaries of a perforasome and perfusion map. The information was used to aid flap design. We describe a new technique of 3D printing a patient-specific perforasome template that can be used preoperatively to infer perforasomes and aid flap design.

  15. Review of Strategies for Thermal Efficiency in Landscape Planning of Cities for Conservation of Energy and Enhanced Climatic Resilience to Urban Warming

    Science.gov (United States)

    Imam, Aabshar U. K.; Banerjee, Uttam Kumar

    2017-09-01

    Thermal discomfort, increased energy consumption, and heat related stress are some of the most prominent consequences of urban warming. Instances of heat related deaths have been reported; the elderly and the poor remain especially vulnerable. Urban greening has often been cited as an economically efficient method for inducing ambient cooling. Consequently, increased impetus is given to provision of public green spaces. However, a general increase in urban green cover especially in the form of parks and green spaces may be inadequate to achieve desired results. This article serves to highlight the thermal heterogeneity of landcape elements and stresses on the need for strategic shade provision. The originality of this study lies in the fact that it provides a comparative review of energy conservation potential of public and private green spaces. It is found that large parks may not have substantial cooling effect on the indoor built environment. Moreover, people tend to spend more time indoors than outdoors. Thus the need for greening of private areas has become an undeniable climatic necessity. The potential of shade trees, green walls, and roof gardens for cooling of built environment are discussed with quantitative evidences of their thermal and economic benefits. Parameters incurring cost expenditure and weaknesses of the greening strategies are enumerated for enabling prudent selection/implementation of strategies. Proposals are generated to improve climatic resilience to urban warming and for diligent planning of cities.

  16. Marine Science Lesson Plans about the Pacific Marine National Monuments: Options for Enhancing Ocean Literacy in the 7th through 12th Grade Classroom

    Science.gov (United States)

    Nelson, Laura K.

    The ocean is one of the Earth's defining features; it provides our world with variety of beneficial services like regulating climate, providing food, and is a source of wonder and inspiration. However, despite its size and powerful nature it is not immune to degradation. One of the greatest risks to our ocean is a general lack of understanding amongst the public of basic ocean processes and how an individual's actions contribute to environmental harm. In the United States, a low level of ocean-centered education in the K-12 classroom contributes to the lack of ocean literacy. This study presents a review of current levels of ocean literacy in the United States and highlights the benefits of increased levels of ocean science education. Barriers, challenges, and potential solutions for the increased implementation of ocean literacy in the classroom are identified. One of the barriers identified is lack of appropriate curricula available to teachers. In response, this study presents a newly developed suite of lesson plans that fit into a variety of scientific disciplines that draw upon the systems of the Pacific Marine National Monuments as examples. Several example lessons are discussed as well as the educational research that influenced their design and the lesson development methodology.

  17. Using the theory of planned behaviour to develop targets for interventions to enhance patient communication during pharmacy consultations for non-prescription medicines.

    Science.gov (United States)

    Watson, Margaret C; Johnston, Marie; Entwistle, Vikki; Lee, Amanda J; Bond, Christine M; Fielding, Shona

    2014-12-01

    To identify modifiable factors that influence patients' information-giving behaviour about their health during consultations with pharmacy staff. A theory of planned behaviour questionnaire was posted to 3000 individuals randomly selected from the Scottish Electoral Register. The 927 respondents confirmed a low rate of disclosure of information about their health to pharmacy staff during their last pharmacy visit. Individuals who intended to give information about their health during pharmacy consultations were more likely to do so. Those who intended to give information during consultations had higher subjective norms than those who did not (i.e. intentions were associated with beliefs that people who were important to them, e.g. family members, doctors, thought they should give information during these consultations). Control beliefs, e.g. 'I am confident that I will give information if I have received good advice in the past', and behavioural beliefs, e.g. 'If I give information I will be sold an appropriate medicine', were not associated with intention or behaviour. Future interventions to promote relevant communication between patients and pharmacy staff should target patients' subjective norms rather than control beliefs or behavioural beliefs. © 2014 Royal Pharmaceutical Society.

  18. Development of a Plan to Implement Enhanced Geothermal Systems (EGS) in the Animas Valley, New Mexico - Final Report - 07/26/2000 - 02/01/2001; FINAL

    International Nuclear Information System (INIS)

    Schochet, Daniel N.; Cunniff, Roy A.

    2001-01-01

    The concept of producing energy from hot dry rock (HDR), originally proposed in 1971 at the Los Alamos National Laboratory, contemplated the generation of electric power by injecting water into artificially created fractures in subsurface rock formations with high heat flow. Recognizing the inherent difficulties associated with HDR, the concept of Enhanced Geothermal Systems was proposed. This embraces the idea that the amount of permeability and fluid in geothermal resources varies across a spectrum, with HDR at one end, and conventional hydrothermal systems at the other. This report provides a concept for development of a ''Combined Technologies Project'' with construction and operation of a 6 MW (net) binary-cycle geothermal power plant that uses both the intermediate-depth hydrothermal system at 1,200 to 3,300 feet and a deeper EGS capable system at 3,000 to 4,000 feet. Two production/injection well pairs will be drilled, one couplet for the hydrothermal system, and one for the E GS system. High-pressure injection may be required to drive fluid through the EGS reservoir from the injection to the production well

  19. Development of a Plan to Implement Enhanced Geothermal Systems (EGS) in the Animas Valley, New Mexico - Final Report - 07/26/2000 - 02/01/2001

    Energy Technology Data Exchange (ETDEWEB)

    Schochet, Daniel N.; Cunniff, Roy A.

    2001-02-01

    The concept of producing energy from hot dry rock (HDR), originally proposed in 1971 at the Los Alamos National Laboratory, contemplated the generation of electric power by injecting water into artificially created fractures in subsurface rock formations with high heat flow. Recognizing the inherent difficulties associated with HDR, the concept of Enhanced Geothermal Systems was proposed. This embraces the idea that the amount of permeability and fluid in geothermal resources varies across a spectrum, with HDR at one end, and conventional hydrothermal systems at the other. This report provides a concept for development of a ''Combined Technologies Project'' with construction and operation of a 6 MW (net) binary-cycle geothermal power plant that uses both the intermediate-depth hydrothermal system at 1,200 to 3,300 feet and a deeper EGS capable system at 3,000 to 4,000 feet. Two production/injection well pairs will be drilled, one couplet for the hydrothermal system, and one for the E GS system. High-pressure injection may be required to drive fluid through the EGS reservoir from the injection to the production well.

  20. 75 FR 39580 - Notice of Realty Action; Direct Sale of Public Lands in Minidoka County, ID

    Science.gov (United States)

    2010-07-09

    ... the owners of the surrounding private land for the appraised fair market value of $85,200. The private... amended (43 U.S.C. 1713 and 1719), at not less than the appraised fair market value: Boise Meridian T. 6 S... fair market value is $85,200. The public land is identified as suitable for disposal in the 1985 BLM...

  1. TIGER/Line Shapefile, 2013, county, Minidoka County, ID, Current Address Ranges Relationship File

    Data.gov (United States)

    US Census Bureau, Department of Commerce — The TIGER/Line shapefiles and related database files (.dbf) are an extract of selected geographic and cartographic information from the U.S. Census Bureau's Master...

  2. Technical Project Plan for The Enhanced Thermal Conductivity of Oxide Fuels Through the Addition of High Thermal Conductivity Fibers and Microstructural Engineering

    Energy Technology Data Exchange (ETDEWEB)

    Hollenbach, Daniel F [ORNL; Ott, Larry J [ORNL; Besmann, Theodore M [ORNL; Armstrong, Beth L [ORNL; Wereszczak, Andrew A [ORNL; Lin, Hua-Tay [ORNL; Ellis, Ronald James [ORNL; Becher, Paul F [ORNL; Jubin, Robert Thomas [ORNL; Voit, Stewart L [ORNL

    2010-09-01

    The commercial nuclear power industry is investing heavily in advanced fuels that can produce higher power levels with a higher safety margin and be produced at low cost. Although chemically stable and inexpensive to manufacture, the in-core performance of UO{sub 2} fuel is limited by its low thermal conductivity. There will be enormous financial benefits to any utility that can exploit a new type of fuel that is chemically stable, has a high thermal conductivity, and is inexpensive to manufacture. At reactor operating temperatures, UO{sub 2} has a very low thermal conductivity (<5 W/m {center_dot}K), which decreases with temperature and fuel burnup. This low thermal conductivity limits the rate at which energy can be removed from the fuel, thus limiting the total integrated reactor power. If the fuel thermal conductivity could be increased, nuclear reactors would be able to operate at higher powers and larger safety margins thus decreasing the overall cost of electricity by increasing the power output from existing reactors and decreasing the number of new electrical generating plants needed to meet base load demand. The objective of the work defined herein is to produce an advanced nuclear fuel based on the current UO{sub 2} fuel with superior thermal conductivity and structural integrity that is suitable for current and future nuclear reactors, using the existing fuel fabrication infrastructure with minimal modifications. There are two separate components to the research: (1) Enhanced Thermal Conductivity (ETC) - adding high conductivity fibers to the UO{sub 2} prior to sintering, which act as conduits for moving the heat energy generated within the pellet to the outer surface, (2) Microstructural Engineering (ME) - adding second phase particulates to UO{sub 2} bodies to retard grain growth and to increase thermal conductivity, as well as improve fracture and creep resistance. Different groups will perform the laboratory work for each of these research

  3. Epistemic Planning

    DEFF Research Database (Denmark)

    Baral, Chitta; Bolander, Thomas; van Ditmarsch, Hans

    investigates the formal semantics of communication and communicative actions, knowledge representation and reasoning focuses on theories of action and change, and automated planning investigates computational techniques and tools to generate plans. The original goals of the seminar were to develop benchmarks......The seminar Epistemic Planning brought together the research communities of Dynamic Epistemic Logic, Knowledge Representation and Reasoning, and Automated Planning to address fundamental problems on the topic of epistemic planning. In the context of this seminar, dynamic epistemic logic...... for epistemic planning, to explore the relationship between knowledge and belief in multi-agent epistemic planning, to develop models of agency and capability in epistemic planning and to explore action types and their representations (these originally separate goals were merged during the seminar), and finally...

  4. Business plan

    OpenAIRE

    Monakov, Victor

    2011-01-01

    The aim of this bachelor's thesis is to prepare a business plan for web design courses in Prague and feasibility & efficiency evaluation of this type of business. In the theoretical part of my bachelor's thesis, I focus on important terms, structure and aspects of a business plan. In the practical part, I apply theoretical knowledge and create a real business plan.

  5. Scenario Planning as Organizational Intervention

    DEFF Research Database (Denmark)

    Balarezo, Jose; Nielsen, Bo Bernhard

    2017-01-01

    Purpose: This paper identifies four areas in need of future research to enhance our theoretical understanding of scenario planning, and sets the basis for future empirical examination of its effects on individual and organizational level outcomes. Design/methodology/approach: This paper organizes...... existing contributions on scenario planning within a new consolidating framework that includes antecedents, processes, and outcomes. The proposed framework allows for integration of the extant literature on scenario planning from a wide variety of fields, including strategic management, finance, human...

  6. Learning Through Scenario Planning

    DEFF Research Database (Denmark)

    Balarezo, Jose

    This project investigates the uses and effects of scenario planning in companies operating in highly uncertain and dynamic environments. Whereas previous research on scenario planning has fallen short of providing sufficient evidence of its mechanisms and effects on individual or organizational...... level variables, this research corrects this void by investigating the dynamics of organizational learning through the lenses of a corporate scenario planning process. This enhances our scientific understanding of the role that scenario planning might play in the context of organizational learning...... and strategic renewal. Empirical evidence of the various difficulties that learning flows has to overcome as it journeys through organizational and hierarchical levels are presented. Despite various cognitive and social psychological barriers identified along the way, the results show the novel...

  7. Planning for Change: Comprehensive Planning.

    Science.gov (United States)

    Temkin, Sanford

    This speech draws a distinction between a priori and a posteriori planning, and relates these two types of planning in coping with the various problems faced by local school districts. The author describes the comprehensive planning process, the development of information required by the process, and how this process is supported in the local…

  8. Strategic Management or Strategic Planning for Defense?

    Science.gov (United States)

    1989-02-01

    strategic management within DoD. Authors offer a series of suggested reforms to enhance mono-level planning and management within DoD, primarily by closer ties with industry planning groups, education, organizational structure, management information systems, and better integration. Additional sponsors are: OSD competitive Strategies Office, OSD Strategic Planning Branch, and the National Security Council Staff. Strategic management , Military organization, Education, Long range planning, Competitive strategies, DoD, Strategic planning, Curriculum

  9. Three-Dimensional Image Fusion of 18F-Fluorodeoxyglucose-Positron Emission Tomography/Computed Tomography and Contrast-Enhanced Computed Tomography for Computer-Assisted Planning of Maxillectomy of Recurrent Maxillary Squamous Cell Carcinoma and Defect Reconstruction.

    Science.gov (United States)

    Yu, Yao; Zhang, Wen-Bo; Liu, Xiao-Jing; Guo, Chuan-Bin; Yu, Guang-Yan; Peng, Xin

    2017-06-01

    The purpose of this study was to describe new technology assisted by 3-dimensional (3D) image fusion of 18 F-fluorodeoxyglucose (FDG)-positron emission tomography (PET)/computed tomography (CT) and contrast-enhanced CT (CECT) for computer planning of a maxillectomy of recurrent maxillary squamous cell carcinoma and defect reconstruction. Treatment of recurrent maxillary squamous cell carcinoma usually includes tumor resection and free flap reconstruction. FDG-PET/CT provided images of regions of abnormal glucose uptake and thus showed metabolic tumor volume to guide tumor resection. CECT data were used to create 3D reconstructed images of vessels to show the vascular diameters and locations, so that the most suitable vein and artery could be selected during anastomosis of the free flap. The data from preoperative maxillofacial CECT scans and FDG-PET/CT imaging were imported into the navigation system (iPlan 3.0; Brainlab, Feldkirchen, Germany). Three-dimensional image fusion between FDG-PET/CT and CECT was accomplished using Brainlab software according to the position of the 2 skulls simulated in the CECT image and PET/CT image, respectively. After verification of the image fusion accuracy, the 3D reconstruction images of the metabolic tumor, vessels, and other critical structures could be visualized within the same coordinate system. These sagittal, coronal, axial, and 3D reconstruction images were used to determine the virtual osteotomy sites and reconstruction plan, which was provided to the surgeon and used for surgical navigation. The average shift of the 3D image fusion between FDG-PET/CT and CECT was less than 1 mm. This technique, by clearly showing the metabolic tumor volume and the most suitable vessels for anastomosis, facilitated resection and reconstruction of recurrent maxillary squamous cell carcinoma. We used 3D image fusion of FDG-PET/CT and CECT to successfully accomplish resection and reconstruction of recurrent maxillary squamous cell carcinoma

  10. Inspection planning

    International Nuclear Information System (INIS)

    Korosec, D.; Levstek, M.F.

    2001-01-01

    Slovenian Nuclear Safety Administration (SNSA) division of nuclear and radiological safety inspection has developed systematic approach to their inspections. To be efficient in their efforts regarding regular and other types of inspections, in past years, the inspection plan has been developed. It is yearly based and organized on a such systematic way, that all areas of nuclear safety important activities of the licensee are covered. The inspection plan assures appropriate preparation for conducting the inspections, allows the overview of the progress regarding the areas to be covered during the year. Depending on the licensee activities and nature of facility (nuclear power plant, research reactor, radioactive waste storage, others), the plan has different levels of intensity of inspections and also their frequency. One of the basic approaches of the plan is to cover all nuclear and radiological important activities on such way, that all regulatory requests are fulfilled. In addition, the inspection plan is a good tool to improve inspection effectiveness based on previous experience and allows to have the oversight of the current status of fulfillment of planned inspections. Future improvement of the plan is necessary in the light of newest achievements on this field in the nuclear world, that means, new types of inspections are planned and will be incorporated into plan in next year.(author)

  11. Test plan :

    Energy Technology Data Exchange (ETDEWEB)

    Dwyer, Stephen F.

    2013-05-01

    This test plan is a document that provides a systematic approach to the planned testing of rooftop structures to determine their actual load carrying capacity. This document identifies typical tests to be performed, the responsible parties for testing, the general feature of the tests, the testing approach, test deliverables, testing schedule, monitoring requirements, and environmental and safety compliance.

  12. Regional Planning.

    Science.gov (United States)

    Bang, Bryan

    1987-01-01

    Explores ideas about regional planning and provides a framework for developing a secondary level course on regional planning. Claims that such a course can help students understand more about the world around them and improve their attitude toward contributing to the management of change. (BR)

  13. Systemic Planning

    DEFF Research Database (Denmark)

    Leleur, Steen

    This book presents principles and methodology for planning in a complex world. It sets out a so-called systemic approach to planning, among other things, by applying “hard” and “soft” methodologies and methods in combination. The book is written for Ph.D and graduate students in engineering......, business and other fields, and it is useful for all professionals, across a wide range of employment areas, who share an interest in renewing planning practice. Such an endeavour is seen as both important and timely, recognising that many complex planning tasks necessitate organisations – be they public...... or private – to engage in planning to prepare proactive decision-making....

  14. Coeur d'Alene Tribe Fisheries Program Research, Monitoring and Evaluation Plan; Implementation of Fisheries Enhancement Opportunities on the Coeur d'Alene Reservation, 1997-2002 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Vitale, Angelo; Lamb, Dave; Peters, Ronald

    2002-11-01

    channel forms. In addition, ponds have been constructed to trap sediment from rill and gully erosion associated with agricultural practices, and to provide flow enhancement and ameliorate elevated stream temperatures during the summer base flow period. The implementation of restoration efforts that target the key habitats and lifestages for resident westslope cutthroat trout on the Coeur d'Alene Reservation is one means the Tribe is using to partially mitigate for lost anadromous fisheries. In this context, restoration is consistent with the definition provided by Ebersole et al. (1997), who described stream restoration as the reexpression of habitat capacity in a stream system. At the reach scale, habitat capacity is affected by biotic (e.g., riparian vegetation) and physical (e.g., flooding) processes. Superimposed on the natural biotic and physical processes are anthropogenic stressors (e.g., logging, roads and grazing) that suppress habitat capacity and can result in simplified, degraded stream reaches. The effectiveness of habitat restoration, measured as an increase in native trout abundance, is dependent on reducing limiting factors (e.g., passage barriers, high water temperatures, sediment transport from source areas) in areas that are critical for spawning and rearing lifestages. This plan outlines a monitoring strategy to help determine the effectiveness of specific restoration/enhancement treatments and to track the status of trout populations in four target watersheds.

  15. business plan

    OpenAIRE

    Luzan, Dmitrij

    2009-01-01

    My thesis is dedicated to the business plan of the gastronomic facility. The thesis describes foundation of the company, analyses demand for the gastronomic services. The financial plan is being presented as well. The thesis includes the analysis of the company's environment, suppliers and customers. SWOT analysis, net present value analysis, index of the net present value and other ratio indexes are the parts of this thesis.

  16. Scenario planning.

    Science.gov (United States)

    Enzmann, Dieter R; Beauchamp, Norman J; Norbash, Alexander

    2011-03-01

    In facing future developments in health care, scenario planning offers a complementary approach to traditional strategic planning. Whereas traditional strategic planning typically consists of predicting the future at a single point on a chosen time horizon and mapping the preferred plans to address such a future, scenario planning creates stories about multiple likely potential futures on a given time horizon and maps the preferred plans to address the multiple described potential futures. Each scenario is purposefully different and specifically not a consensus worst-case, average, or best-case forecast; nor is scenario planning a process in probabilistic prediction. Scenario planning focuses on high-impact, uncertain driving forces that in the authors' example affect the field of radiology. Uncertainty is the key concept as these forces are mapped onto axes of uncertainty, the poles of which have opposed effects on radiology. One chosen axis was "market focus," with poles of centralized health care (government control) vs a decentralized private market. Another axis was "radiology's business model," with one pole being a unified, single specialty vs a splintered, disaggregated subspecialty. The third axis was "technology and science," with one pole representing technology enabling to radiology vs technology threatening to radiology. Selected poles of these axes were then combined to create 3 scenarios. One scenario, termed "entrepreneurialism," consisted of a decentralized private market, a disaggregated business model, and threatening technology and science. A second scenario, termed "socialized medicine," had a centralized market focus, a unified specialty business model, and enabling technology and science. A third scenario, termed "freefall," had a centralized market focus, a disaggregated business model, and threatening technology and science. These scenarios provide a range of futures that ultimately allow the identification of defined "signposts" that can

  17. Energy planning and management plan

    International Nuclear Information System (INIS)

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  18. Development of a discharge planning mentorship program.

    Science.gov (United States)

    Hansen, D C; Matt-Hensrud, N; Holland, D E; Severson, M A

    2000-01-01

    Discharge planning coordinators at a tertiary medical center developed a Discharge Planning Mentorship Program. The group established the educational program to support the autonomy of the staff primary nurse in the discharge planning component of professional practice. To establish the program, the discharge planning coordinators used the underlying principle of "CollaMentoach." The term is an acronym combining the three core concepts of collaboration, mentoring, and coaching. Program planning and marketing, participant selection, curriculum development, and curriculum evaluation are included to guide staff development specialists and nurse managers in the formulation of a program to enhance staff nurse discharge planning skills.

  19. Evolution of the Birth Plan

    OpenAIRE

    Kaufman, Tamara

    2007-01-01

    Many birth professionals are discarding the birth plan as an outdated and ineffectual document. This column discusses the past limitations and present uses of the birth plan in an effort to enhance current teaching on how expectant parents can write and use this important document. Encouraging expectant parents to prepare two separate, but corresponding, birth plans—the “Discussion Birth Plan” and the “Hospital Birth Plan”—is proposed. Teaching suggestions and possible implications are explor...

  20. The Austrian Space Plan

    Science.gov (United States)

    Pseiner, K.; Balogh, W.

    2002-01-01

    After several years of preparation and discussion among the involved players, the Austrian Space Plan was approved for implementation in November 2001. Based on careful benchmarking and analysis of the capabilities of the Austrian space sector it aims to create excellent conditions for the sector's further development. The new space strategy embraces Austria's participation in the mandatory and optional programmes of the European Space Agency and establishes a National Space Programme supported by separate funding opportunities. A set of clearly-defined indicators ensures that the progress in implementing the Space Plan can be objectively judged through independent, annual reviews. The National Space Programme promotes international cooperation in space research and space activities with the aim to strengthen the role of space science and to better prepare Austrian space industry for the commercial space market. In the framework of the Space Plan the Austrian Space Agency has been tasked with integrating the industry's growing involvement in aeronautics activities to better utilize synergies with the space sector. This paper reviews the various steps leading to the approval of the new space strategy and discusses the hurdles mastered in this process. It reports on the Space Plan's first results, specifically taking into account projects involving international cooperation. For the first the Austria aerospace-sector can rely on an integrated strategy for aeronautics- and space activities which is firmly rooted in the efforts to enhance the country's R&D activities. It may also act as a useful example for other small space- using countries planning to enhance their involvement in space activities.

  1. Conference Planning.

    Science.gov (United States)

    Burke, W. Warner, Ed.; Beckhard, Richard, Ed.

    This book, written to instruct in the use of a conference as a medium of social intercourse, is divided into four sections. Section I, which contains five articles, deals with factors to be considered in planning a conference. Specific techniques one can employ to improve a conference and several different techniques for evaluating the…

  2. Aerocapacitor commercialization plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-12

    The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

  3. 14 CFR 259.5 - Customer service plan.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Customer service plan. 259.5 Section 259.5... REGULATIONS ENHANCED PROTECTIONS FOR AIRLINE PASSENGERS § 259.5 Customer service plan. (a) Adoption of Plan. Each covered carrier shall adopt a Customer Service Plan applicable to its scheduled flights and shall...

  4. A cluster randomised controlled trial and process evaluation of a training programme for mental health professionals to enhance user involvement in care planning in service users with severe mental health issues (EQUIP): study protocol for a randomised controlled trial.

    Science.gov (United States)

    Bower, Peter; Roberts, Chris; O'Leary, Neil; Callaghan, Patrick; Bee, Penny; Fraser, Claire; Gibbons, Chris; Olleveant, Nicola; Rogers, Anne; Davies, Linda; Drake, Richard; Sanders, Caroline; Meade, Oonagh; Grundy, Andrew; Walker, Lauren; Cree, Lindsey; Berzins, Kathryn; Brooks, Helen; Beatty, Susan; Cahoon, Patrick; Rolfe, Anita; Lovell, Karina

    2015-08-13

    Involving service users in planning their care is at the centre of policy initiatives to improve mental health care quality in England. Whilst users value care planning and want to be more involved in their own care, there is substantial empirical evidence that the majority of users are not fully involved in the care planning process. Our aim is to evaluate the effectiveness and cost-effectiveness of training for mental health professionals in improving user involvement with the care planning processes. This is a cluster randomised controlled trial of community mental health teams in NHS Trusts in England allocated either to a training intervention to improve user and carer involvement in care planning or control (no training and care planning as usual). We will evaluate the effectiveness of the training intervention using a mixed design, including a 'cluster cohort' sample, a 'cluster cross-sectional' sample and process evaluation. Service users will be recruited from the caseloads of care co-ordinators. The primary outcome will be change in self-reported involvement in care planning as measured by the validated Health Care Climate Questionnaire. Secondary outcomes include involvement in care planning, satisfaction with services, medication side-effects, recovery and hope, mental health symptoms, alliance/engagement, well-being and quality of life. Cost- effectiveness will also be measured. A process evaluation informed by implementation theory will be undertaken to assess the extent to which the training was implemented and to gauge sustainability beyond the time-frame of the trial. It is hoped that the trial will generate data to inform mental health care policy and practice on care planning. ISRCTN16488358 (14 May 2014).

  5. 810 Future plans

    International Nuclear Information System (INIS)

    Etkin, A.; Foley, K.J.; Hackenburg, R.W.; Longacre, R.S.; Love, W.A.; Morris, T.W.; Platner, E.D.; Saulys, A.C.; Lindenbaum, S.J.; Chan, C.S.; Kramer, M.A.; Hallman, T.J.; Madansky, L.; Bonner, B.E.; Buchanan, J.A.; Chiou, C.N.; Clement, J.M.; Corcoran, M.D.; Kruk, J.W.; Miettinen, H.E.; Mutchler, G.S.; Nessi-Tedaldi, F.; Nessi, M.; Roberts, J.B.

    1990-01-01

    It is believed that a good bet for finding the Quark-Gluon Plasma at AGS energies is with the heaviest projectiles on the heaviest target, i.e. Au on Au. One of the likely signatures of the plasma is strangeness enhancement. Al Saulys has shown what it's like to find Δ and K degree with Si projectiles. Our Monte Carlo simulations show track densities 4 times higher for Au projectiles. In addition, the Au beam itself produces 30 times more ionization. Thus the present TPC's will be limited to only a few hundred ions per sec. This paper discusses plans for these experiments and modification to TPC. 9 figs

  6. VOYAGE PLANNING

    Directory of Open Access Journals (Sweden)

    Kazimierz SKÓRA

    2016-09-01

    Full Text Available A sea voyage can be divided into three parts with varying degrees of risk: - from the berth at the port of departure to the pilot disembarkation point - from the pilot disembarkation to another pilot embarkation point near the port of call/destination - from the pilot embarkation point to the berth Results of statistical research into ship accidents at sea point to an increased number of incidents and accidents, including groundings, especially in restricted areas. Such areas are often narrow and have limited depths, while their short straight sections require frequent course alterations, often in varying hydrometeorological conditions. Due to all these factors, the voyage has to be carefully planned and all watchkeeping officers have to be well prepared to conduct the ship safely. The article presents the objectives, scope, legal basis and stages in the process of voyage planning. The compliance with the outlined principles will reduce the level of risk in maritime transport.

  7. Planning Inequality

    DEFF Research Database (Denmark)

    Mandersheid, Katharina; Richardson, Tim

    2011-01-01

    While traces and techniques of power and contestation around the understanding and production of spaces are clearly recognized in the sociological and planning research literature, there has been little rigorous attention to how socio-spatial inequality is put at stake in strategic mobilization...... around particular spatial imaginaries. In an analysis of the German Spatial Planning Report, the paper examines how inequalities are represented in relation to space and movement in spatial strategy. The analysis shows how, in the report, the spatial dimension of the social is represented...... as a territorial container, in which the social merges into regional and national entities. Correspondingly, movement is only interpreted as a derived demand, ignoring its integrative aspect as precondition of participation and part of network capital. On the other hand, the spatiality of the economy...

  8. Big plans.

    Science.gov (United States)

    Fitch, Kevin F; Doyle, James F

    2005-09-01

    In Elmhurst Memorial Healthcare's capital planning method: Future replacement costs of assets are estimated by inflating their historical cost over their lives. A balanced model is created initially based on the assumption that rates of revenue growth, inflation, investment income, and interest expense are all equal. Numbers then can be adjusted to account for possible variations, such as excesses or shortages in investment or debt balances.

  9. Strategic plan

    International Nuclear Information System (INIS)

    1993-01-01

    In November 1989, the Office of Environmental Restoration and Waste Management (EM) was formed within the US Department of Energy (DOE). The EM Program was born of the recognition that a significant national effort was necessary to clean up over 45 years' worth of environmental pollution from DOE operations, including the design and manufacture of nuclear materials and weapons. Within EM, the Deputy Assistant Secretary for Environmental Restoration (EM-40) has been assigned responsibility for the assessment and cleanup of areas and facilities that are no longer a part of active DOE operations, but may be contaminated with varying levels and quantifies of hazardous, radioactive, and n-mixed waste. Decontamination and decommissioning (D ampersand D) activities are managed as an integral part of Envirorunental Restoration cleanup efforts. The Office of Environmental Restoration ensures that risks to the environment and to human health and safety are either eliminated or reduced to prescribed, acceptable levels. This Strategic Plan has been developed to articulate the vision of the Deputy Assistant Secretary for Environmental Restoration and to crystallize the specific objectives of the Environmental Restoration Program. The document summarizes the key planning assumptions that guide or constrain the strategic planning effort, outlines the Environmental Restoration Program's specific objectives, and identifies barriers that could limit the Program's success

  10. Plan Repair using a Plan Library

    NARCIS (Netherlands)

    Van der Krogt, R.P.J.; De Weerdt, M.M.

    2005-01-01

    Plan library's have proven their added value to the efficiency of planning. In this paper, we present results on the use of a plan library to plan repair. We show that using a relatively simple library, we can already obtain significant improvements in efficiency compared to plan repair without a

  11. Software test plan/description/report (STP/STD/STR) for the enhanced logistics intratheater support tool (ELIST) global data segment. Version 8.1.0.0, Database Instance Segment Version 8.1.0.0, ...[elided] and Reference Data Segment Version 8.1.0.0 for Solaris 7; TOPICAL

    International Nuclear Information System (INIS)

    Dritz, K.; Absil-Mills, M.; Jacobs, K.

    2002-01-01

    This document is the Software Test Plan/Description/Report (STP/STD/STR) for the DII COE Enhanced Logistics Intratheater Support Tool (ELIST) mission application. It combines in one document the information normally presented separately in a Software Test Plan, a Software Test Description, and a Software Test Report; it also presents this information in one place for all the segments of the ELIST mission application. The primary purpose of this document is to show that ELIST has been tested by the developer and found, by that testing, to install, deinstall, and work properly. The information presented here is detailed enough to allow the reader to repeat the testing independently. The remainder of this document is organized as follows. Section 1.1 identifies the ELIST mission application. Section 2 is the list of all documents referenced in this document. Section 3, the Software Test Plan, outlines the testing methodology and scope-the latter by way of a concise summary of the tests performed. Section 4 presents detailed descriptions of the tests, along with the expected and observed results; that section therefore combines the information normally found in a Software Test Description and a Software Test Report. The remaining small sections present supplementary information. Throughout this document, the phrase ELIST IP refers to the Installation Procedures (IP) for the Enhanced Logistics Intratheater Support Tool (ELIST) Global Data Segment, Database Instance Segment, Database Fill Segment, Database Segment, Database Utility Segment, Software Segment, and Reference Data Segment

  12. BUSINESS PLANS INFORMED BY DESIGN

    DEFF Research Database (Denmark)

    Petersen, Sørren Ingomar; Heebøll, John

    2011-01-01

    Today the value created by applying design at a business model and innovation level as opposed to a design and process level is marginal. Interviews with product developers from academia and industry suggest this is due to a lack of design perspective when formulating and evaluating business plans....... To remedy this, we propose including Design Quality Criteria drivers in the formulation of business plans. While auditing entrepreneurial business plans and design briefs content gaps were revealed between them. Strategy and context differences as well as a negative correlation between investors’ business...... types. These were the design of products based on sustainable and on disruptive technologies. In conclusion, we recommend a procedure to align and translate business plan content into inspirational design briefs for enhancing design concept synthesis performance....

  13. Transdisciplinary Planning Project Learning

    Directory of Open Access Journals (Sweden)

    Luis Alberto Mora Belandria

    2017-08-01

    Full Text Available The learning projects allow the teacher to recognize their experiences, knowledge, skills, strengths, weaknesses, potentialities to decide what and how to teach; Allow the contextualization of components of knowledge areas with a holistic and systemic view, taking from the environment data, events, knowledge that contribute to the humanist and integral formation of students, to the development of their social conscience, to the achievement of the profile of the new Citizen who aspires to society. This in its management process will enhance the reconstruction of thought to achieve teaching. The study generated theoretical references of the transdisciplinary planning of the learning projects; Framed in a qualitative approach, supported by the documentary method, using hermeneutic-dialectical validity and reliability, with the qualitative research processes: categorization, structuring, contrasting and theorizing. It was evidenced that the teachers in the planning of the learning projects show a mechanical and routine attitude, which does not allow to see the systemic relation of the planning process, there is fragmentation, the teacher does not achieve the transdisciplinarity of the curriculum due to its positivist vision of reality. It is necessary to direct a teaching perspective based on the epistemological reconstruction of its action based on transdisciplinarity.

  14. Multiemployer Pension Plans

    Data.gov (United States)

    Pension Benefit Guaranty Corporation — This spreadsheet lists the active multiemployer pensions plans insured by PBGC. Plans are identified by name, employer identification number (EIN) and plan number...

  15. Safety case plan 2008

    International Nuclear Information System (INIS)

    2008-07-01

    Following the guidelines set forth by the Ministry of Trade and Industry (now Ministry of Employment and Economy) Posiva is preparing to submit the construction license application for a spent fuel repository by the end of the year 2012. The long-term safety section supporting the license application is based on a safety case, which, according to the internationally adopted definition, is a compilation of the evidence, analyses and arguments that quantify and substantiate the safety and the level of expert confidence in the safety of the planned repository. In 2005, Posiva presented a plan to prepare such a safety case. The present report provides a revised plan of the safety case contents mentioned above. The update of the safety case plan takes into account the recommendations made by the Radiation and Nuclear Safety Authority (STUK) about improving the focus and further developing the plan. Accordingly, particular attention is given to the quality management of the safety case work, the management of uncertainties and the scenario methodology. The quality management is based on the ISO 9001:2000 standard process thinking enhanced with special features arising from STUK's YVL Guides. The safety case production process is divided into four main sub-processes. The conceptualisation and methodology sub-process defines the framework for the assessment. The critical data handling and modelling sub-process links Posiva's main technical and scientific activities to the production of the safety case. The assessment sub-process analyses the consequences of the evolution of the disposal system in various scenarios, classified either as part of the expected evolution or as disruptive scenarios. The compliance and confidence sub-process is responsible for final evaluation of compliance of the assessment results with the regulatory criteria and the overall confidence in the safety case. As in the previous safety case plan, the safety case will be based on several reports, but

  16. Architectural Technology and Technological Planning

    Directory of Open Access Journals (Sweden)

    Giorgio Giallocosta

    2011-11-01

    Full Text Available At least three fundamental aspects of the many singular technological approaches to architectural planning are currently evolving significantly and are ripe for potential development. The first relates to enhanced opportunities for defining the ex-ante characteristics and performance of building products and components, but particularly concerns potential leadership assumptions in planning and the ‘reification’ of architecture through ‘collective’ behaviours. The second relates to the tendency to try and overcome the connotation of architectural projects, inclusive of their entire life cycle. The third relates to current evolutionary developments (either potential or simply implicit in performance approach.

  17. Nuclear Station Facilities Improvement Planning

    International Nuclear Information System (INIS)

    Hooks, R. W.; Lunardini, A. L.; Zaben, O.

    1991-01-01

    An effective facilities improvement program will include a plan for the temporary relocation of personnel during the construction of an adjoining service building addition. Since the smooth continuation of plant operation is of paramount importance, the phasing plan is established to minimize the disruptions in day-to-day station operation and administration. This plan should consider the final occupancy arrangements and the transition to the new structure; for example, computer hookup and phase-in should be considered. The nuclear industry is placing more emphasis on safety and reliability of nuclear power plants. In order to do this, more emphasis is placed on operations and maintenance. This results in increased size of managerial, technical and maintenance staffs. This in turn requires improved office and service facilities. The facilities that require improvement may include training areas, rad waste processing and storage facilities, and maintenance facilities. This paper discusses an approach for developing an effective program to plan and implement these projects. These improvement projects can range in magnitude from modifying a simple system to building a new structure to allocating space for a future project. This paper addresses the planning required for the new structures with emphasis on site location, space allocation, and internal layout. Since facility planning has recently been completed by Sargent and Leyden at six U. S. nuclear stations, specific examples from some of those plants are presented. Site planning and the establishment of long-range goals are of the utmost importance when undertaking a facilities improvement program for a nuclear station. A plan that considers the total site usage will enhance the value of both the new and existing facilities. Proper planning at the beginning of the program can minimize costs and maximize the benefits of the program

  18. Tip enhancement

    CERN Document Server

    Kawata, Satoshi

    2007-01-01

    This book discusses the recent advances in the area of near-field Raman scattering, mainly focusing on tip-enhanced and surface-enhanced Raman scattering. Some of the key features covered here are the optical structuring and manipulations, single molecule sensitivity, analysis of single-walled carbon nanotubes, and analytic applications in chemistry, biology and material sciences. This book also discusses the plasmonic materials for better enhancement, and optical antennas. Further, near-field microscopy based on second harmonic generation is also discussed. Chapters have been written by some of the leading scientists in this field, who present some of their recent work in this field.·Near-field Raman scattering·Tip-enhanced Raman spectroscopy·Surface-enhanced Raman spectroscopy·Nano-photonics·Nanoanalysis of Physical, chemical and biological materials beyond the diffraction limits·Single molecule detection

  19. Overview of the Hanford risk management plan

    Energy Technology Data Exchange (ETDEWEB)

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  20. Overview of the Hanford risk management plan

    International Nuclear Information System (INIS)

    Halverson, T.G.

    1998-01-01

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context

  1. Coeur d'Alene Tribe Fish and Wildlife Program Habitat Protection Plan; Implementation of Fisheries Enhancement Opportunities on the Coeur d'Alene Reservation, 1997-2002 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Vitale, Angelo; Roberts, Frank; Peters, Ronald

    2002-06-01

    , including the Coeur d'Alene Indian Reservation (Coeur d'Alene Tribe 1998). Implicit in this statement is a commitment to provide native subsistence resources in the present and near future as well as the long-term by employing all the mitigation and conservation measures available to them. The development of this Habitat Protection Plan is intended to provide additional planning level guidance as the implementation of conservation measures moves forward. The purpose of this plan is to develop a systematic approach to habitat restoration that will ultimately lead to self-perpetuating, harvestable populations of native fish, wildlife and botanical species. Specifically, it is our intention to apply the principles and analyses presented in this plan to prioritize future restoration efforts that receive funding under the Northwest Power Planning Council's Resident Fish and Wildlife Mitigation Programs. Using an ecosystem restoration approach based on landscape ecology concepts (Primack 1993), the basic premise of the plan is to (1) protect functioning habitat conditions and (2) restore degraded habitat conditions. This plan focuses on habitat conditions at the watershed scale (macrohabitat) rather than on the needs of single species and/or species guilds. By focusing restoration efforts at a macrohabitat level, restoration efforts target all native species inhabiting that area. This approach marks a paradigm shift that emphasizes ecological based restoration rather than species-specific restoration. Traditionally, fish managers and wildlife managers have approached restoration independently, often dedicating resources to a single species by focusing on specific habitat types on a small spatial scale (microhabitat) (Robinson and Bolen 1989, Marcot et al. 2002). This management technique has done little to curb declines despite large budgets (Pianka 1994). Restoration on a landscape level has shown promising results (Holling 1992) and many riparian and wetland

  2. Plan Colombia

    Directory of Open Access Journals (Sweden)

    Noam Chomsky

    2000-12-01

    Full Text Available Colombia recibe más ayuda militar de Estados Unidos que el resto de América Latina y el Caribe unidos, y esta situación puede profundizarse con la ejecución del Plan Colombia, fundamentado en la lucha antidrogas. Sin embargo, el pais ha sido calificado con el récord en violación de derechos humanos. En este contexto se aplica la reforma económica más significativa en la década de los noventa, generando condicionantes en los procesos de integración con sus vecinos. En concordancia con el secretario de Defensa, Henry Stimson, desde los años 60 Estados Unidos estaba autorizado para controlar su propio sistema regional, mientras todos los demás intenlos serian desmantelados. La presentación ambigua de esta política del gobierno estadounidense en Colombia es cómo disociar esta guerra contra la droga y la lucha irregular contrainsurgente En Estados Unidos hay otra opinión que debe conocerse para comprender las divergencias en e! interior de dicho país. Este artículo del prestigioso profesor universitario del MU, Noam Chomsky, es un referente obligado en términos de opinión pública y académica de dimensión internacional, por el inmenso respeto que infunde tanto en América como en Europa

  3. Determinants of family planning uptake among men in Ibadan, Nigeria

    African Journals Online (AJOL)

    Background: Adoption of family planning by men or their spouses many times is influenced by men particularly in developing countries. This is despite evidence that reduction of maternal mortality and morbidity is tied to family planning use. In order to design programmes that enhance adoption of family planning methods ...

  4. Strategy to Enhance International Supply Chain Security

    National Research Council Canada - National Science Library

    2007-01-01

    .... at 1901, 1903, October 13, 2006) which require the development of a strategic plan to enhance the security of the international supply chain, including protocols for the expeditious resumption of the flow of trade following...

  5. Hanford Facility contingency plan

    International Nuclear Information System (INIS)

    Sutton, L.N.; Miskho, A.G.; Brunke, R.C.

    1993-10-01

    The Hanford Facility Contingency Plan, together with each TSD unit-specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. This plan includes descriptions of responses to a nonradiological hazardous materials spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. This plan includes descriptions of responses for spills or releases as a result of transportation activities, movement of materials, packaging, and storage of hazardous materials

  6. Hanford Site Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  7. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J.; Yancey, E.F.

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs

  8. Community development planning

    International Nuclear Information System (INIS)

    Gray, S.I.

    1983-01-01

    The focus of this paper will be methods of local community involvement in the community development planning efforts which will be required at the recommended sites. Community development planning will include capital improvement plans, housing plans, zoning changes, business development plans and other community service and fiscal plans required to meet the projected needs of new residents as a result of the repository construction and operation. This paper will present, (1) the need for community planning, (2) methods of responding to community planning needs, (3) current community planning issues to be addressed. 2 references, 1 figure

  9. Advance care planning in a community setting.

    Science.gov (United States)

    Connolly, Josaleen; Milligan, Stuart; Stevens, Elaine; Jackson, Susan; Rooney, Kevin

    2015-02-10

    To evaluate the effects of implementing an advance care planning process within pilot sites in North Ayrshire in 2010, focusing on people with palliative care needs. Data were collected from participants in advance care planning training using a questionnaire. Semi-structured interviews were conducted and an audit of documentation was undertaken. Thirty nine questionnaires were returned, a response rate of 16%. Twenty four out of 25 (96%) participants rated the training as having improved their understanding of the advance care planning process. The general consensus in interviews was that advance care planning is a worthwhile process. Participants reported patients achieving their preferred place of end of life care and greater consultation regarding hospitalisation. Within the pilot sites, advance care planning training enhanced the ability of professionals to implement the advance care planning process and record the wishes of patients and residents.

  10. The alignment between spatial planning, transportation planning ...

    African Journals Online (AJOL)

    The debate and discourse for the need to integrate spatial planning, transportation planning and environmental management strategically, functionally and operationally is ongoing since the early 1990s. This includes the articulation of the planning instruments used by the professionals within these functional fields and the ...

  11. Maintenance Business Plans.

    Science.gov (United States)

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  12. VT Planning Atlas

    Data.gov (United States)

    Vermont Center for Geographic Information — The Planning Atlas provides easy access to commonly requested land use planning data – the status of local planning and regulation, state designation boundaries and...

  13. Calfornia General Plans Rural

    Data.gov (United States)

    California Department of Resources — We undertook creating the first ever seamless statewide General Plan map for California. All county general plans and many city general plans were integrated into 1...

  14. Calfornia General Plans

    Data.gov (United States)

    California Department of Resources — We undertook creating the first ever seamless statewide General Plan map for California. All county general plans and many city general plans were integrated into 1...

  15. Calfornia General Plans

    Data.gov (United States)

    California Natural Resource Agency — We undertook creating the first ever seamless statewide General Plan map for California. All county general plans and many city general plans were integrated into 1...

  16. The ground based plan

    International Nuclear Information System (INIS)

    1989-01-01

    The paper presents a report of ''The Ground Based Plan'' of the United Kingdom Science and Engineering Research Council. The ground based plan is a plan for research in astronomy and planetary science by ground based techniques. The contents of the report contains a description of:- the scientific objectives and technical requirements (the basis for the Plan), the present organisation and funding for the ground based programme, the Plan, the main scientific features and the further objectives of the Plan. (U.K.)

  17. 11. Strategic planning.

    Science.gov (United States)

    2014-05-01

    There are several types of planning processes and plans, including strategic, operational, tactical, and contingency. For this document, operational planning includes tactical planning. This chapter examines the strategic planning process and includes an introduction into disaster response plans. "A strategic plan is an outline of steps designed with the goals of the entire organisation as a whole in mind, rather than with the goals of specific divisions or departments". Strategic planning includes all measures taken to provide a broad picture of what must be achieved and in which order, including how to organise a system capable of achieving the overall goals. Strategic planning often is done pre-event, based on previous experience and expertise. The strategic planning for disasters converts needs into a strategic plan of action. Strategic plans detail the goals that must be achieved. The process of converting needs into plans has been deconstructed into its components and includes consideration of: (1) disaster response plans; (2) interventions underway or planned; (3) available resources; (4) current status vs. pre-event status; (5) history and experience of the planners; and (6) access to the affected population. These factors are tempered by the local: (a) geography; (b) climate; (c) culture; (d) safety; and (e) practicality. The planning process consumes resources (costs). All plans must be adapted to the actual conditions--things never happen exactly as planned.

  18. 1994 Panel 1 Utilization Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The Waste Isolation Pilot Plant (WIPP) is intended to receive, handle, and permanently dispose of transuranic (TRU) waste. To fulfill this mission, the U.S. Department of Energy (DOE) constructed a full-scale facility to demonstrate both technical and operational principles of the permanent isolation of TRU waste. The WIPP consists of surface and underground facilities. Panel 1 is situated in the underground facility horizon which is located approximately 2,150 feet below the surface in the predominantly halite Salado Formation. The Panel 1 Utilization Plan provides a strategy for the optimum use of Panel 1 which is consistent with the priorities established by the DOE to accomplish the WIPP mission. These priorities, which include maintaining personnel safety, conducting performance assessment, and continued operational enhancements, are the guiding premise for the decisions on the planned usage of the WIPP underground facility. The continuation of ongoing investigations along with the planned testing and training to be carried out in Panel 1 will enhance the current knowledge and understanding of the operational and geotechnical aspects of the panel configuration. This enhancement will ultimately lead to safer, more efficient, and more cost-effective methods of operation. Excavation of the waste storage area began in May 1986 with the mining of entries to Panel 1. The original design for the waste storage rooms at the WIPP provided a limited period of time during which to mine the openings and to emplace waste. Each panel, consisting of seven storage rooms, was scheduled to be mined and filled in less than 5 years. Panel 1 was developed to receive waste for a demonstration phase that was scheduled to start in October 1988. The demonstration phase was deferred, and the experimental test program was modified to use contact-handled (CH) transuranic waste in bin-scale tests, planned for Room 1, Panel 1

  19. Speech enhancement

    CERN Document Server

    Benesty, Jacob; Chen, Jingdong

    2006-01-01

    We live in a noisy world! In all applications (telecommunications, hands-free communications, recording, human-machine interfaces, etc.) that require at least one microphone, the signal of interest is usually contaminated by noise and reverberation. As a result, the microphone signal has to be ""cleaned"" with digital signal processing tools before it is played out, transmitted, or stored.This book is about speech enhancement. Different well-known and state-of-the-art methods for noise reduction, with one or multiple microphones, are discussed. By speech enhancement, we mean not only noise red

  20. THE DEFENSE PLANNING SYSTEMS AND THEIR IMPLICATIONS

    Directory of Open Access Journals (Sweden)

    Laszlo STICZ

    2010-01-01

    Full Text Available Defense planning in the Alliance is a fundamental element of the arrangements which enable its member countries to enjoy the crucial political, military and resource advantages of collective defense and other common military efforts to enhance security and stability. In this respect, the aim of this paper is to outline the role of the Armed Forces and the specific processes aiming to achieve the ultimate goal of a nation regarding national security, with focus on defense planning and the PDPS.

  1. NERSC Strategic Implementation Plan 2002-2006

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  2. The Ten-Year 2007-2016 Plan of Power Expansion in the context of the recovering of Brazilian electric sector planning: advances and possible enhancements; O Plano Decenal de Expansao de Energia 2007/2016 no contexto da retomada do planejamento do setor eletrico brasileiro: avancos e possiveis aprimoramentos

    Energy Technology Data Exchange (ETDEWEB)

    Buratini, Ricardo [Universidade Estadual de Campinas (IE/UNICAMP), SP (Brazil). Inst. de Economia

    2008-07-01

    The purpose of this paper is to analyze the methodology for power consumption projection presented in the Ten-year (2007-2016) Plan of Power Expansion (PDEE 2007/2016) and to propose some questions for discussion. Indeed, bearing in mind the progress achieved in the recent past with respect to the resumption of long term planning in the Brazilian electric power sector, it is pertinent to promote a discussion about the possible limitations of the expansion methodology proposed in PDEE. In short, it is believed that, starting from such a discussion, it could be possible to contribute towards the aim of making the planning process of the Brazilian electric power sector expansion more transparent, more consistent and more participative, consequently bringing a greater convergence of the expectations of the agents of the sector. The main questions raised in this paper about the PDEE's methodology are with respect to the absence of sufficient detail about the interactive adjustment of the several models used to project the consumption, as well as to the lack of information about the models themselves. The general conclusion of this paper is that, in order that the PDEE meets its objective of providing correct signals to all the agents, it is necessary to include more incisively the sector's specialists and the private agents in the methodological discussions, so that no important doubts will remain about the various projections. In our understanding, the success of such an enterprise will depend not only on the disposition of the agents, but on the greater detail and depth that should be previously given to the questions raised in this paper. It is certainly a significant challenge, of a high complexity but of an even higher importance to the electric power sector and to the Brazilian economy. (author)

  3. ENPEP model enhancements at ANL

    International Nuclear Information System (INIS)

    Guziel, K.A.

    1997-01-01

    Argonne National Laboratory (ANL) has been involved in energy and electricity planning analyses for almost 20 years. Their activities include the development of analytical tools and methodologies along with their application to a wide variety of national energy planning studies. The methodologies cover all aspects of energy planning. In response to a request by the US Department of Energy (USDOE) to integrate existing tools into a package that could be distributed to developing countries for their own use, the ENergy and Power Evaluation Program (ENPEP) was developed. The USDOE wanted an all purpose tool that would allow the user to do a complete energy analysis, from demand forecast through primary energy resources allocation to electricity generation system expansion plan and environmental analysis. Since its original development, the ENPEP modules have been improved and enhanced to incorporate advancements in computer hardware and software technology, as well as to correct bugs that were identified in the programs. In cooperation with other organizations (e.g. The World Bank - IBRD - and the International Atomic Energy Agency - IAEA -), the ENPEP package has been used at national, regional and inter-regional training courses, as well as in the conduct of national energy/electricity planning studies. This paper reviews the development of the ENPEP package and the proposed enhancements to the package. (author). 1 fig., 2 tabs

  4. Idaho National Engineering Laboratory site development plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This plan briefly describes the 20-year outlook for the Idaho National Engineering Laboratory (INEL). Missions, workloads, worker populations, facilities, land, and other resources necessary to fulfill the 20-year site development vision for the INEL are addressed. In addition, the plan examines factors that could enhance or deter new or expanded missions at the INEL. And finally, the plan discusses specific site development issues facing the INEL, possible solutions, resources required to resolve these issues, and the anticipated impacts if these issues remain unresolved.

  5. Idaho National Engineering Laboratory site development plan

    International Nuclear Information System (INIS)

    1994-09-01

    This plan briefly describes the 20-year outlook for the Idaho National Engineering Laboratory (INEL). Missions, workloads, worker populations, facilities, land, and other resources necessary to fulfill the 20-year site development vision for the INEL are addressed. In addition, the plan examines factors that could enhance or deter new or expanded missions at the INEL. And finally, the plan discusses specific site development issues facing the INEL, possible solutions, resources required to resolve these issues, and the anticipated impacts if these issues remain unresolved

  6. Remedial action planning for Trench 1

    International Nuclear Information System (INIS)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.; Castaneda, N.

    1998-01-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site

  7. Marketing Planning: Feeniks Koulu

    OpenAIRE

    Raut, Biranjan

    2013-01-01

    Degree Thesis “Marketing Planning: Feeniks Koulu” demonstrates structured marketing planning process with the help of case company “Feeniks Koulu”. The central idea of Thesis is to come up with systematic marketing plan following structured process. Thesis employs qualitative research methodology following inductive reasoning approach. Thesis, initiates by outlining theoretical planning methods, which then is materialized into marketing plan with the help of empirical research. Discussion and...

  8. Conditional Epistemic Planning

    DEFF Research Database (Denmark)

    Andersen, Mikkel Birkegaard; Bolander, Thomas; Jensen, Martin Holm

    2012-01-01

    Recent work has shown that Dynamic Epistemic Logic (DEL) offers a solid foundation for automated planning under partial observability and non-determinism. Under such circumstances, a plan must branch if it is to guarantee achieving the goal under all contingencies (strong planning). Without branc....... In addition to plan verification, we provide a tableau-inspired algorithm for synthesising plans, and show this algorithm to be terminating, sound and complete....

  9. PPARC. 1998 business plan

    International Nuclear Information System (INIS)

    1998-01-01

    scientific priority produced and published by its Science Committee in December 1997. Council has confirmed the importance of maintaining scientific excellence and breadth in its research programme, and is particularly concerned to ensure that the UK secures a cost-effective scientific return on its past and continuing investments in CERN and ESA. It has confirmed the priority given to the production of high quality trained scientists and engineers (increasingly recognised as of national importance); to its industrial collaboration programme to enhance industrial competitiveness; and to the promotion of public awareness and understanding of science. Council has maintained the growth in these 'White Paper' objective areas. The principal short-term objectives addressed in this Plan are: to complete the rationalisation of support for the ground-based astronomy programme, centred around the formation of the Astronomy Technology Centre (ATC) in Edinburgh; to commence the implementation of the long term strategy for ground-based astronomy in the Gemini era of 8 m telescopes; to commence the substantial programme for UK participation in the CERN LHC scientific programme, now recommended by Council to OST and Treasury for authorisation; and to prepare for appropriate investment in the next missions of ESA's Horizons 2000 Space Science Programme. Substantial resources have been set aside in 1998/99 to expedite the restructuring of the Royal Observatories as rapidly and effectively as possible. Technological support of the ground-based astronomy programme, formerly carried out by the Royal Observatories (RGO and ROE), will be concentrated at the new ATC in Edinburgh from 1 April 1998, with other activities continuing in a variety of institutes, including the Universities of Cambridge and Edinburgh. The longer term savings resulting from this restructuring have been reinvested in the research programme. Council will continue to give high priority to securing efficiency gains and other

  10. Environmental Implementation Plan - EIP introduction

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1993-01-01

    Due to the commitment and participation of more than 100 professionals from site environmental coordinators, customer improvements and total quality are being incorporated into the Environmental Implementation Plan (EIP). The EIP is now a living document that communicates an overview of site environmental programs and the facility plans that are designed to protect the environment and meet changing regulatory requirements. Continuous improvement of environmental programs is enhanced through planned quarterly self-assessments during the open-quotes Reflectionsclose quotes process. Through the sharing of noteworthy practices, lessons learned, and ideas for improvement, the EIP provides a framework for environmental professionals to promote cost effective solutions and program improvements through teamwork and communication. These efforts were initiated by the Central Environmental Committee Executive Committee (CECEC) and developed and coordinated by the EIP subcommittee. The EIP revision process is the baseline for a continuous improvement cycle. Although the EIP is a Westinghouse Savannah River Company (WSRC) document, the environmental-planning process involves and will benefit all site contractors. Together, we are committed to a open-quotes Partnership in Environmental Excellence.close quotes

  11. Strategic Planning for Research Reactors

    International Nuclear Information System (INIS)

    2017-01-01

    This publication is a revision of IAEA-TECDOC-1212 which primarily focused on enhancing the utilization of existing research reactors. This updated version also provides guidance on how to develop and implement a strategic plan for a new research reactor project and will be of particular interest for organizations which are preparing a feasibility study to establish such a new facility. This publication will enable managers to determine more accurately the actual and potential capabilities of an existing reactor, or the intended purpose and type of a new facility. At the same time, management will be able to match these capabilities to stakeholders/users’ needs and establish the strategy of meeting such needs. In addition, several annexes are presented, including some examples as clarification to the main text and ready-to-use templates as assistance to the team drafting a strategic plan.

  12. Planned hospital birth versus planned home birth

    DEFF Research Database (Denmark)

    Olsen, O.; Clausen, J.A.

    2012-01-01

    Observational studies of increasingly better quality and in different settings suggest that planned home birth in many places can be as safe as planned hospital birth and with less intervention and fewer complications. This is an update of a Cochrane review first published in 1998....

  13. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden about the plans for the final disposal of the radioactive waste products of the nuclear power. Part 1 describes the general background, the plans for research and development, including the necessary facilities. The time schedule and the calculated costs of the operations are presented. (G.B.)

  14. Planning for information systems

    CERN Document Server

    King, William R

    2015-01-01

    Edited by one of the best-known and most widely respected figures in the field, ""Planning for Information Systems"" is a comprehensive, single source overview of the myriad ideas and processes that are identified with IS planning. While many chapters deal with high level strategic planning, the book gives equal attention to on-the-ground planning issues.Part I, 'Key Concepts of IS Planning', focuses on how IS planning has evolved over the years; business-IS strategic alignment; and the role of dynamic organizational capabilities in leveraging IS competencies. Part II, 'The Organizational IS P

  15. Nuclear safety research master plan

    International Nuclear Information System (INIS)

    Ha, Jae Joo; Yang, J. U.; Jun, Y. S. and others

    2001-06-01

    The SRMP (Safety Research Master Plan) is established to cope with the changes of nuclear industry environments. The tech. tree is developed according to the accident progress of the nuclear reactor. The 11 research fields are derived to cover the necessary technologies to ensure the safety of nuclear reactors. Based on the developed tech. tree, the following four main research fields are derived as the main safety research areas: 1. Integrated nuclear safety enhancement, 2. Thermal hydraulic experiment and assessment, 3. Severe accident management and experiment, and 4. The integrity of equipment and structure. The research frame and strategies are also recommended to enhance the efficiency of research activity, and to extend the applicability of research output

  16. Nuclear safety research master plan

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Jae Joo; Yang, J. U.; Jun, Y. S. and others

    2001-06-01

    The SRMP (Safety Research Master Plan) is established to cope with the changes of nuclear industry environments. The tech. tree is developed according to the accident progress of the nuclear reactor. The 11 research fields are derived to cover the necessary technologies to ensure the safety of nuclear reactors. Based on the developed tech. tree, the following four main research fields are derived as the main safety research areas: 1. Integrated nuclear safety enhancement, 2. Thermal hydraulic experiment and assessment, 3. Severe accident management and experiment, and 4. The integrity of equipment and structure. The research frame and strategies are also recommended to enhance the efficiency of research activity, and to extend the applicability of research output.

  17. Teacher Planning in a learning outcome perspective

    DEFF Research Database (Denmark)

    Bremholm, Jesper; Skott, Charlotte Krog

    2017-01-01

    Like most European countries, Denmark is facing dramatic educational changes towards a focus on learning outcome. This focus enhances the importance of teachers’ planning. However, research studies highlight the plight of teachers facing severe challenges when trying to fulfil the requirements. I...

  18. 24 CFR 91.320 - Action plan.

    Science.gov (United States)

    2010-04-01

    ... investment geographically. When appropriate, the state should estimate the percentage of funds they plan to... institutional structure, enhance coordination between public and private housing and social service agencies... applications from local governments for funding, including the relative importance of the criteria, where...

  19. Planning for Planetary Science Mission Including Resource Prospecting, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Advances in computer-aided mission planning can enhance mission operations and science return for surface missions to Mars, the Moon, and beyond. While the...

  20. Handbook on Planning for Sustainability for Water and Wastewater Utilities

    Science.gov (United States)

    The handbook details steps utilities can undertake to enhance their existing planning processes to ensure that water infrastructure investments are cost-effective over their life-cycle, resource efficient and support other relevant community goals.

  1. EDITORIAL: Enhancing nanolithography Enhancing nanolithography

    Science.gov (United States)

    Demming, Anna

    2012-01-01

    Lithography was invented in late 18th century Bavaria by an ambitious young playwright named Alois Senefelder. Senefelder experimented with stone, wax, water and ink in the hope of finding a way of reproducing text so that he might financially gain from a wider distribution of his already successful scripts. His discovery not only facilitated the profitability of his plays, but also provided the world with an affordable printing press that would ultimately democratize the dissemination of art, knowledge and literature. Since Senefelder, experiments in lithography have continued with a range of innovations including the use of electron beams and UV that allow increasingly higher-resolution features [1, 2]. Applications for this have now breached the limits of paper printing into the realms of semiconductor and microelectronic mechanical systems technology. In this issue, researchers demonstrate a technique for fabricating periodic features in poly(3,4-ethylene dioxythiophene)-poly(styrenesulfonate) (PEDOT-PSS) [3]. Their method combines field enhancements from silica nanospheres with laser-interference lithography to provide a means of patterning a polymer that has the potential to open the market of low-end, high-volume microelectronics. Laser-interference lithography has already been used successfully in patterning. Researchers in Korea used laser-interference lithography to generate stamps for imprinting a two-dimensional photonic crystal structure into green light emitting diodes (LEDs) [4]. The imprinted patterns comprised depressions 100 nm deep and 180 nm wide with a periodicity of 295 nm. In comparison with unpatterned LEDs, the intensity of photoluminescence was enhanced by a factor of seven in the LEDs that had the photonic crystal structures imprinted in them. The potential of exploiting field enhancements around nanostructures for new technologies has also attracted a great deal of attention. Researchers in the USA and Australia have used the field

  2. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... health care Get health insurance Get help with family planning Get help with mental health Find girls' health ... health care Get health insurance Get help with family planning Get help with mental health Find girls' health ...

  3. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... health topics Find Help Get breastfeeding help Get health care Get health insurance Get help with family planning ... health topics Find Help Get breastfeeding help Get health care Get health insurance Get help with family planning ...

  4. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... topics Find Help Get breastfeeding help Get health care Get health insurance Get help with family planning ... topics Find Help Get breastfeeding help Get health care Get health insurance Get help with family planning ...

  5. FHWA scenario planning guidebook

    Science.gov (United States)

    2011-02-01

    The purpose of this guidebook is to assist transportation agencies with carrying out a scenario : planning process from start to finish. Transportation agencies can use the guidebook as a framework : to develop a scenario planning approach tailored t...

  6. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Get breastfeeding help Get health care Get health insurance Get help with family planning Get help with ... Get breastfeeding help Get health care Get health insurance Get help with family planning Get help with ...

  7. Understanding health insurance plans

    Science.gov (United States)

    ... medlineplus.gov/ency/patientinstructions/000879.htm Understanding health insurance plans To use the sharing features on this ... for you and your family. Types of Health Insurance Plans Depending on how you get your health ...

  8. Maine highway safety plan

    Science.gov (United States)

    2010-01-01

    Each September 1, the MeBHS must provide NHTSA a comprehensive plan to reduce : traffic crashes and resulting deaths, injuries and property damage. The Highway Safety : Plan (HSP) serves as Maines application for available federal funds for these ...

  9. Pursuing happiness in planning?

    DEFF Research Database (Denmark)

    Lorentzen, Anne Birte

    2015-01-01

    Experience economic planning. Towards an urban staging system? Vancouver's journey form regional ressource periphery to global metropolis. The chaning cityscape of Vancouver. Values guiding urban planning in Vancouver. Governance of urban transformation in Vancouver. Planners as stagers in Vancou...

  10. Product Life Cycle Planning

    National Research Council Canada - National Science Library

    Walaszek, Jeffrey

    2003-01-01

    .... This phase of work was undertaken to: (1) provide guidelines, technical support, and planning approaches for researchers that result in realistic life cycle plans for products emerging from the RSM...

  11. Planning of nets

    International Nuclear Information System (INIS)

    Carberry, M

    1996-01-01

    The paper is about the planning of nets in areas of low density like it is the case of the rural areas. The author includes economic and technological aspects, planning of nets, demands and management among others

  12. Technology Implementation Plan

    DEFF Research Database (Denmark)

    Jensen, Karsten Ingerslev; Schultz, Jørgen Munthe

    The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential.......The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential....

  13. Familiy Planning and Pregnancy

    Science.gov (United States)

    ... Storage Pool Deficiencies Home About Bleeding Disorders Family planning and pregnancy Carriers should receive genetic counselling about ... Diagnosis When to Test for Carrier Status Family Planning and Pregnancy Conception Options Prenatal Diagnosis Fetal Sex ...

  14. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... To receive Breastfeeding email updates Enter email Submit Planning ahead From choosing the crib to finding a ... care Get health insurance Get help with family planning Get help with mental health Find girls' health ...

  15. Integrated transportation scenario planning.

    Science.gov (United States)

    2010-07-01

    Regional land usetransportation scenario planning emerged as a planning technique in U.S. : metropolitan areas in the 1990s. Building on prior work by this research team, this study continues : to track the development and expansion of regional sc...

  16. TECHNOLOGICAL IMPLEMENTATION PLAN

    DEFF Research Database (Denmark)

    Bellini, Anna

    2004-01-01

    This document has the purpose to describe the technological implementation plan in the IDEAL project.......This document has the purpose to describe the technological implementation plan in the IDEAL project....

  17. An Automation Planning Primer.

    Science.gov (United States)

    Paynter, Marion

    1988-01-01

    This brief planning guide for library automation incorporates needs assessment and evaluation of options to meet those needs. A bibliography of materials on automation planning and software reviews, library software directories, and library automation journals is included. (CLB)

  18. From Event Planning to Legacy Planning

    OpenAIRE

    Elo, Lauri

    2016-01-01

    The importance of legacy and legacy planning is increasing in the event industry. Mega-events are becoming so expensive to host that the opportunity costs decreases the amount of potential future hosts. The events aim to surpass the costs by creating positive legacies, impacts that last longer than the event itself. Small-events can also have legacies and the positive affects can be even more significant than with the mega-events. Event planning must change to legacy planning in the future, b...

  19. Sport event marketing plan

    Directory of Open Access Journals (Sweden)

    Gašović Milan

    2007-01-01

    Full Text Available A marketing plan details how an event organization will compete in the marketplace in terms of its service offerings, promotions and evaluation. During the first stage of the marketing plan process, a number of its consumers (current, former and prospective and competitors. Marketing objectives are developed and implemented using an action plan. The marketing plan objectives are evaluated using an objective-discrepancy approach to determine the extent to which they were attained.

  20. Making Planning Work

    DEFF Research Database (Denmark)

    Eibe Sørensen, Hans

    2018-01-01

    Planning for a growth opportunity's success remains a challenge. Under which conditions does planning work, then? This exploratory study investigates the business development tasks and processes that span a growth opportunity's planning phase and its implementation phase and their unique...... performance implications. On the basis of 73 CEO responses from growth SMEs, the results show that business development increases firm performance and that the effectiveness of business planning depends on business development. Business developer support is found to positively influence firm performance per...

  1. Adaptive Airport Strategic Planning

    NARCIS (Netherlands)

    Kwakkel, J.H.; Walker, W.E.; Marchau, V.A.W.J.

    2010-01-01

    Airport Strategic Planning (ASP) focuses on the development of plans for the long-term development of an airport. The dominant approach for ASP is Airport Master Planning (AMP). The goal of AMP is to provide a detailed blueprint for how the airport should look in the future, and how it can get

  2. Sandia Strategic Plan 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    Sandia embarked on its first exercise in corporate strategic planning during the winter of 1989. The results of that effort were disseminated with the publication of Strategic Plan 1990. Four years later Sandia conducted their second major planning effort and published Strategic Plan 1994. Sandia`s 1994 planning effort linked very clearly to the Department of Energy`s first strategic plan, Fueling a Competitive Economy. It benefited as well from the leadership of Lockheed Martin Corporation, the management and operating contractor. Lockheed Martin`s corporate success is founded on visionary strategic planning and annual operational planning driven by customer requirements and technology opportunities. In 1996 Sandia conducted another major planning effort that resulted in the development of eight long-term Strategic Objectives. Strategic Plan 1997 differs from its predecessors in that the robust elements of previous efforts have been integrated into one comprehensive body. The changes implemented so far have helped establish a living strategic plan with a stronger business focus and with clear deployment throughout Sandia. The concept of a personal line of sight for all employees to this strategic plan and its objectives, goals, and annual milestones is becoming a reality.

  3. Introduction to planning law

    International Nuclear Information System (INIS)

    Ronellenfitsch, M.

    1986-01-01

    The author surveys the planning law in the Federal Republic of Germany. He deals with general regulations of the administrative procedure and land-use planning procedure and the main special rules of planning law, according to the Atomic Energy Act, the Nuclear Installation Ordinance and the Federal Act on the Protection against Nuisances. (WG) [de

  4. The Project of Planning

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    1986-01-01

    This article contains an interview with John Friedmann. The interview covers two core areas in John Friedmann's work: (a) The history of planning, from the beginning of the industrial era till today and (b) radical planning and social mobilization. In relation to radical planning and social mobil...

  5. PLANNING OF HOSPITAL ACTIVITY

    OpenAIRE

    Tihomira Zlatanova; Ralitsa Zlatanova-Velikova; Angelina Cheshmedzieva; Natalia Shtereva

    2014-01-01

    In this article are presented and analyzed planning of hospital activity. Introduced planning process depending on the type of health care system - countries with national health systems there is a tendency to set targets backed by norms, while in countries with fully or partially liberalized system developed a variety of techniques for strategic planning.

  6. Planning for Family Development.

    Science.gov (United States)

    Montgomery, Mary Jean; Quinn, Jim

    This manual is designed to help child care providers develop, implement, and evaluate a family development plan for at-risk families. The plan's five components are designed to: (1) identify family strengths; (2) identify family needs; (3) identify community resources; (4) develop and implement a family action plan; and (5) monitor family…

  7. Planning for agroforestry

    NARCIS (Netherlands)

    Budd, W.W.; Duchhart, I.; Hardesty, L.N.; Steiner, F.

    1990-01-01

    In this book a selection of contributions to the international symposium "Planning for agroforestry", held at Washington State University on April 24-27, 1989, is published. First the planning for agroforestry and agroforestry diagnosis and design is viewed over. Then the planning for and

  8. Generational Pension Plan Designs

    NARCIS (Netherlands)

    Huang, Xiaohong; Mahieu, Ronald

    2010-01-01

    We propose a generational plan for the occupational pension provision in which people from the same generation are pooled in a generational fund. Each fund can set its own policies independently. This plan provides the benefits of differentiation missing in the prevailing collective plan and the

  9. The alignment between spatial planning, transportation planning ...

    African Journals Online (AJOL)

    philosophical nature. This statement should be interpreted with the objectives, as identified in the. National Framework for Sustainable. Development in South Africa ..... Spatial Development. Frameworks. Governmental. Administration. Management. Urban. Planning. Frameworks. Architecture/. Urban Design. Operations.

  10. Climate plan 2004; Plan climat 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    The Climate Plan is an action plan drawn up by the French Government to respond to the climate change challenge, first by 2010 (complying with the Kyoto Protocol target), and, secondly, beyond this date. Projections for France show that national emissions could be 10% higher than the Kyoto target in 2010 if no measures are taken. This is particularly due to increasing emissions in the sectors affecting daily life (residential-tertiary sectors, transport, etc.). For this reason, the Climate Plan contains measures affecting all sectors of the economy and the daily life of all French citizens with a view to economizing the equivalent of 54 million tonnes of CO{sub 2} each year by the year 2010, which will help to reverse the trend significantly. Beyond 2010, the Climate Plan sets out a strategy for technological research which will enable France to meet a target of reducing greenhouse gas emissions four or fivefold by 2050. (author)

  11. Transportation planning for planned special events

    Science.gov (United States)

    2011-05-01

    Unique among planned special event activities are those events that carry the National Special Security Event (NSSE) designation. NSSEs occur with some frequency, with 35 of these events held between September 1998 and February 2010. These events inc...

  12. The Past, Present, and Future of Discharge Planning in Taiwan

    Directory of Open Access Journals (Sweden)

    Shu-Chuan Lin

    2013-06-01

    Full Text Available Discharge planning is an interdisciplinary approach to provide continuity of care; it is a process that includes identification, assessment, goal setting, planning, implementation, coordination, and evaluation. Discharge planning has been viewed as a major way to enhance a smooth transition for patients from the hospital to home or other chronic care units and as a solution to solve problems associated with postdischarge care. The promotion of discharge planning began in the United States in the 1960s. Nursing scholars from Taiwan learned about the concept of discharge planning from the United States in the early 1980s and subsequently introduced it to Taiwanese medical institutions in 1985. A policy to promote discharge planning in Taiwan was announced by the Executive Yuan, Department of Health in 1993. Following the healthcare reforms in 1995, discharge planning has since been strongly promoted. Studies concerning discharge planning in Taiwan showed some promising results, including increased satisfaction of patients and their families, improved preparation of caregivers, and improved quality of life for patients. However, patients receiving interdisciplinary discharge planning services were still in the minority. There was no standard evaluation procedure for interdisciplinary discharge planning, and a high percentage of patients thought that hospitals handled the postdischarge long-term care services referral procedure inadequately. Despite the positive attitudes toward discharge planning, many physicians still demonstrate an unsatisfactory level of knowledge and behaviors with regard to discharge planning. To enhance the implementation of discharge planning, a standard evaluation procedure for interdisciplinary discharge planning and improved physician awareness concerning the importance of discharge planning are needed. In Taiwan, the improvement of discharge planning in the foreseeable future is promising with the accreditation of the

  13. Advanced Education and Technology Business Plan, 2008-11

    Science.gov (United States)

    Alberta Advanced Education and Technology, 2008

    2008-01-01

    The Ministry of Advanced Education and Technology's 2008-11 business plan identifies how it plans to work over the next three years to enhance advanced learning opportunities and innovation for all Albertans. Alberta's advanced learning system is composed of public board-governed institutions, the apprenticeship and industry training system,…

  14. Public participation in town-planning applications: Tlokwe Local ...

    African Journals Online (AJOL)

    Although public participation is deemed important in South Africa, negative perceptions of its legitimacy are widely acknowledged. Inclusive town-planning processes, as instruments to address inequality, have a significant role in enhancing democracy. This article reports on a study done from a communicative planning ...

  15. An Examination of Family Physicians Plan Implementation in Rural ...

    African Journals Online (AJOL)

    Background: Family physician plan (FPP) and referral system (RS) is one of the major plans in Iran's health system with the aim of increasing the accountability in the health market, enhancing the public's access to the health services, lowering the unnecessary costs and equitable distribution of health across the society.

  16. From action planning and plan enactment to fruit consumption: moderated mediation effects.

    Science.gov (United States)

    Kasten, Stefanie; van Osch, Liesbeth; Eggers, Sander Matthijs; de Vries, Hein

    2017-10-23

    Sufficient fruit consumption is beneficial for a healthy live. While many Dutch adults intent to eat the recommended amount of fruit, only 5-10% of the population actually adheres to the recommendation. One mechanism that can help to narrow this gap between intention and actual fruit consumption is action planning. However, action planning is only assumed to be effective if plans are enacted. This study assessed which action plans are made and enacted, and further aimed to investigate two main hypotheses: 1. the effect of action planning (at T1) on fruit consumption (at T2) is mediated by plan enactment (at T3); 2. positive intentions (2a), high self-efficacy (2b) and a strong habit to eat fruit (2c) enhance the mediation of plan enactment, whereas a strong habit to eat snacks (2d) hinders the mediation of plan enactment. This study was a self-reported longitudinal online survey study. A total of 428 participants filled in a survey, measuring demographic factors (e.g. gender, age, education level), several socio-cognitive constructs (i.e. attitudes, self-efficacy, habit, action planning, plan enactment), and fruit consumption, at three points in time (baseline, after 1 month, and after 3 months). Mediation and moderated mediation analyses were used to investigate the planning-plan enactment- fruit consumption relationship. Up to 70% of the participants reported to have enacted their T1 action plans at T2. Action planning on fruit consumption was fully mediated by plan enactment (Hypothesis 1). All four proposed moderators (i.e. intention, self-efficacy, habit to consume fruit, and habit to consume snacks) significantly influenced the mediation (Hypotheses 2a-2d). Mediation of plan enactment was only present with high levels of intention, high levels of self-efficacy, strong habits to eat fruit, and weak habits to eat snacks. The study suggests the importance of plan enactment for fruit consumption. Furthermore, it emphasizes the necessity of facilitating factors

  17. From action planning and plan enactment to fruit consumption: moderated mediation effects

    Directory of Open Access Journals (Sweden)

    Stefanie Kasten

    2017-10-01

    Full Text Available Abstract Objectives Sufficient fruit consumption is beneficial for a healthy live. While many Dutch adults intent to eat the recommended amount of fruit, only 5–10% of the population actually adheres to the recommendation. One mechanism that can help to narrow this gap between intention and actual fruit consumption is action planning. However, action planning is only assumed to be effective if plans are enacted. This study assessed which action plans are made and enacted, and further aimed to investigate two main hypotheses: 1. the effect of action planning (at T1 on fruit consumption (at T2 is mediated by plan enactment (at T3; 2. positive intentions (2a, high self-efficacy (2b and a strong habit to eat fruit (2c enhance the mediation of plan enactment, whereas a strong habit to eat snacks (2d hinders the mediation of plan enactment. Methods This study was a self-reported longitudinal online survey study. A total of 428 participants filled in a survey, measuring demographic factors (e.g. gender, age, education level, several socio-cognitive constructs (i.e. attitudes, self-efficacy, habit, action planning, plan enactment, and fruit consumption, at three points in time (baseline, after 1 month, and after 3 months. Mediation and moderated mediation analyses were used to investigate the planning-plan enactment- fruit consumption relationship. Results Up to 70% of the participants reported to have enacted their T1 action plans at T2. Action planning on fruit consumption was fully mediated by plan enactment (Hypothesis 1. All four proposed moderators (i.e. intention, self-efficacy, habit to consume fruit, and habit to consume snacks significantly influenced the mediation (Hypotheses 2a-2d. Mediation of plan enactment was only present with high levels of intention, high levels of self-efficacy, strong habits to eat fruit, and weak habits to eat snacks. Conclusion The study suggests the importance of plan enactment for fruit consumption

  18. Inspection and test planning

    International Nuclear Information System (INIS)

    Miller, T.

    1980-01-01

    Purpose of Quality Plan - arrangement of all necessary tests or inspections as far as possible filted to certain components or systems. Subject of Quality Plan - precise determination of tests or inspections and - according to the actual safety significance - the certificates to be done. Disposition of Quality Plan - accommodation of tests to the actual state of fabrication. Application of Quality Plan - to any component or system that is regarded. Supervision of Employment - by authorized personnel of manufacturer, customer or authority providing exact employment of quality plan. Overservance of Instructions - certificates given by authorized personnel. (orig./RW)

  19. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  20. Technology for Democracy in Smart City Planning

    Directory of Open Access Journals (Sweden)

    Paolo De Pascali

    2014-02-01

    Full Text Available In recent history the relationship between technology and urban planning has been variously taken into account (and possibly also undervalued, but lately it has come into focus with the maturation ofthe concept of the Smart City. Building on an analysis of documents dealing with the issue andcurrent experiences, this paper tries to determine which opportunity factors the new technologies are offering for the improvement of urban planning. In particular it considers how these technologies arebeing integrated into the processes of participatory planning thus supporting the development of direct democracy. The resulting complex framework suggests four main fields of application where the new technologies can contribute to addressing contents and governance of the plan for an urban organisation that enhances virtuous behaviours and steers the town’s residents towardsadopting them.

  1. Appropriate Pedagogical Approaches For Conduct of Site Planning and Built Environment Studio in Spatial Planning Education Programs

    Directory of Open Access Journals (Sweden)

    Valliappan Alagappan

    2015-09-01

    Full Text Available Spatial planning education is multi-disciplinary in nature and particularly site planning needs exposure to Engineering, Architectural, Landscape, Sociological, Economic, and Infrastructural aspects. The curriculum of the spatial planning program introduces the site-planning studio (multi-level design and planning at the initial semesters without introduction of single space design and planning. Due to inadequate exposure the students find it difficult to plan and design residential layouts in the planning studio. The site-planning studio provides a good understanding of how the articulation of density can modify the built form and environment. There are considerable lacunae in the adopted approaches of site planning studios in various planning schools. The author discusses in detail the varied methodologies and approaches adopted in site planning and built environment studio programs. The two pedagogical studios methods experimented in the site-planning studio were discussed at length. One method discusses from unit level planning and designing to block and neighborhood level and other method discusses from neighborhood to block and unit level. Within these two studio pedagogical methodologies, for conduct of site planning exercises two approaches were generally adopted i.e block-based approach and Design based approach. The characteristic features, outcomes, advantages and disadvantages of each methodologies /approach offer an understanding of how site-planning studios have to be taught in the planning program. The author emphasizes the importance of a gradual progression from a single space design and planning to multi-level design and planning for enhanced comprehension of students.

  2. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  3. Smart City Planning

    DEFF Research Database (Denmark)

    Ekman, Ulrik

    2018-01-01

    This article reflects on the challenges for urban planning posed by the emergence of smart cities in network societies. In particular, it reflects on reductionist tendencies in existing smart city planning. Here the concern is with the implications of prior reductions of complexity which have been...... undertaken by placing primacy in planning on information technology, economical profit, and top-down political government. Rather than pointing urban planning towards a different ordering of these reductions, this article argues in favor of approaches to smart city planning via complexity theory....... Specifically, this article argues in favor of approaching smart city plans holistically as topologies of organized complexity. Here, smart city planning is seen as a theory and practice engaging with a complex adaptive urban system which continuously operates on its potential. The actualizations in the face...

  4. Setup planning for machining

    CERN Document Server

    Hazarika, Manjuri

    2015-01-01

    Professionals as well as researchers can benefit from this comprehensive introduction into the topic of setup planning, which reflects the latest state of research and gives hands-on examples. Starting with a brief but thorough introduction, this book explains the significance of setup planning in process planning and includes a reflection on its external constraints. Step-by-step the different phases of setup planning are outlined and traditional as well as modern approaches, such as fuzzy logic based setup planning, on the solution of setup planning problems are presented. Three detailed examples of applications provide a clear and accessible insight into the up-to-date techniques and various approaches in setup planning.

  5. Interactive Energy Planning

    DEFF Research Database (Denmark)

    Blarke, Morten Boje

    2006-01-01

    anchoring along the shores of the land of communications and collaboration. Whether or not a particular typology is applicable, theory and praxis are establishing standpoints, which strengthens our understanding of the planning complex, and which should inspire improved energy planning methodologies...... and tools. This paper presents an “Interactive Energy Planning” framework, which is intended to support interactivity in planning, building on important theoretical and experimental advances in planning. In particular, the paper explores the potential significance of allowing a critical perspective...... on context analysis and problem-orientation to define the course of the planning process, and deploying value-rational planning tools primarily as a platform for interactivity. The focus on interactivity in energy planning will allow contemporary government planners, consultants, researchers...

  6. Can a More User-Friendly Medicare Plan Finder Improve Consumers' Selection of Medicare Plans?

    Science.gov (United States)

    Martino, Steven C; Kanouse, David E; Miranda, David J; Elliott, Marc N

    2017-10-01

    To evaluate the efficacy for consumers of two potential enhancements to the Medicare Plan Finder (MPF)-a simplified data display and a "quick links" home page designed to match the specific tasks that users seek to accomplish on the MPF. Participants (N = 641) were seniors and adult caregivers of seniors who were recruited from a national online panel. Participants browsed a simulated version of the MPF, made a hypothetical plan choice, and reported on their experience. Participants were randomly assigned to one of eight conditions in a fully factorial design: 2 home pages (quick links, current MPF home page) × 2 data displays (simplified, current MPF display) × 2 plan types (stand-alone prescription drug plan [PDP], Medicare Advantage plan with prescription drug coverage [MA-PD]). The quick links page resulted in more favorable perceptions of the MPF, improved users' understanding of the information, and increased the probability of choosing the objectively best plan. The simplified data display resulted in a more favorable evaluation of the website, better comprehension of the displayed information, and, among those choosing a PDP only, an increased probability of choosing the best plan. Design enhancements could markedly improve average website users' understanding, ability to use, and experience of using the MPF. © Health Research and Educational Trust.

  7. Progressivity Enhanced

    Directory of Open Access Journals (Sweden)

    Marko Hren

    2013-09-01

    Full Text Available Rather than a scientific text, the author contributes a concise memorandum from the originator of the idea who has managed the campaign for the conversion of the military barracks into a creative cluster between 1988 and 2002, when he parted ways with Metelkova due to conflicting views on the center’s future. His views shed light on a distant period of time from a perspective of a participant–observer. The information is abundantly supported by primary sources, also available online. However, some of the presented hypotheses are heavily influenced by his personal experiences of xenophobia, elitism, and predatorial behavior, which were already then discernible on the so-called alternative scene as well – so much so that they obstructed the implementation of progressive programs. The author claims that, in spite of the substantially different reality today, the myths and prejudices concerning Metelkova must be done away with in order to enhance its progressive nature. Above all, the paper calls for an objective view on internal antagonisms, mainly originating in deep class divisions between the users. These make a clear distinction between truly marginal ndividuals and the overambitious beau-bourgeois, as the author labels the large part of users of Metelkova of »his« time. On these grounds, he argues for a robust approach to ban all forms of xenophobia and self-ghettoization.

  8. Incorporating climate change into systematic conservation planning

    Science.gov (United States)

    Groves, Craig R.; Game, Edward T.; Anderson, Mark G.; Cross, Molly; Enquist, Carolyn; Ferdana, Zach; Girvetz, Evan; Gondor, Anne; Hall, Kimberly R.; Higgins, Jonathan; Marshall, Rob; Popper, Ken; Schill, Steve; Shafer, Sarah L.

    2012-01-01

    The principles of systematic conservation planning are now widely used by governments and non-government organizations alike to develop biodiversity conservation plans for countries, states, regions, and ecoregions. Many of the species and ecosystems these plans were designed to conserve are now being affected by climate change, and there is a critical need to incorporate new and complementary approaches into these plans that will aid species and ecosystems in adjusting to potential climate change impacts. We propose five approaches to climate change adaptation that can be integrated into existing or new biodiversity conservation plans: (1) conserving the geophysical stage, (2) protecting climatic refugia, (3) enhancing regional connectivity, (4) sustaining ecosystem process and function, and (5) capitalizing on opportunities emerging in response to climate change. We discuss both key assumptions behind each approach and the trade-offs involved in using the approach for conservation planning. We also summarize additional data beyond those typically used in systematic conservation plans required to implement these approaches. A major strength of these approaches is that they are largely robust to the uncertainty in how climate impacts may manifest in any given region.

  9. Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mill, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Dong, Changgui [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sigrin, Ben [National Renewable Energy Lab. (NREL), Golden, CO (United States); Zuboy, Jarrett [Independent Consultant

    2016-08-19

    The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. 1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. 2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. 3) Characterizing DPV as a resource option: Today’s most comprehensive plans account for all of DPV’s monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. 4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. 5) Accounting for DPV’s location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. 6) Estimating DPV’s impact on transmission and distribution investments: Innovative practices are being

  10. Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Andrew D.; Barbose, Galen L.; Seel, Joachim; Dong, Changgui; Mai, Trieu; Sigrin, Ben; Zuboy, Jarett

    2016-08-01

    The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. (1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. (2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. (3) Characterizing DPV as a resource option: Today's most comprehensive plans account for all of DPV's monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. (4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. (5) Accounting for DPV's location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. (6) Estimating DPV's impact on transmission and distribution investments: Innovative

  11. Post-processing techniques to enhance reliability of assignment algorithm based performance measures.

    Science.gov (United States)

    2011-01-01

    This study develops an enhanced transportation planning framework by augmenting the sequential four-step : planning process with post-processing techniques. The post-processing techniques are incorporated through a feedback : mechanism and aim to imp...

  12. Development Plans and Life Plans: Knowledge Sharing?

    Directory of Open Access Journals (Sweden)

    Juan José Vieco Albarracín

    2010-02-01

    Full Text Available This article explores the possibilities of establishing knowledge sharing between governmental development plans and the “life plans” (planes de vida made by indigenous organizations, in particular the life plan of the Asociación de Autoridades Indígenas del Resguardo Tikuna, Cocama, Yagua (Aticoya, municipality of Puerto Nariño, Amazonas, Colombia. Colombia’s Constitution of 1991 created the ETI (Entidad Territorial Indígena,“indigenous territorial entity” as a territorial unit, just like municipalities, departments, and districts. This means that indigenous reservations (or “reserves” or “preserves” and associations should manage public funds, for which they must design a life plan. This inclusion and recognition of indigenous peoples entails that those life plans should articulate with the municipal, departmental, and national development plans. The article illustrates this situation by comparing two welfare programs –Resa (Red de Seguridad Alimentaria “Food Security Network” and Familias Guardabosques (“Forest Ranger Families”– and two income-generating productive and service (tourism projects carried out by Aticoya and the local indigenous councils of communities on the Amazon and Loretoyacu Rivers.

  13. Biosecurity Plan for Palmyra Atoll

    Science.gov (United States)

    Hathaway, Stacie A.; Fisher, Robert N.

    2010-01-01

    This Biosecurity Plan for Palmyra Atoll was developed for The Nature Conservancy (TNC) Palmyra Program to refine and expand goals and objectives developed through the Conservation Action Plan process. The Biosecurity Plan is one in a series of adaptive management plans designed to achieve TNC's mission toward the protection and enhancement of native wildlife and habitat. The Biosecurity Plan focuses on ecosystem security, and specifically identifies and addresses issues related to non-native and potentially invasive species. The Plan attempts to identify pathways of invasion and strategies for preventing or reducing new introductions. Overall, the Biosecurity Plan provides a framework to implement and track the progress of conservation and restoration goals related to non-native species on Palmyra Atoll. Palmyra Atoll is one of the Northern Line Islands in the Pacific Ocean southwest of the Hawai`ian Islands. It consists of many heavily vegetated islets arranged in a horseshoe pattern around four lagoons and surrounded by a coral reef. At present, Palmyra Atoll harbors various non-native or invasive species in the terrestrial and marine ecosystems. The most notable examples of terrestrial invasive species include coconut trees (Cocos nucifera) and black rats (Rattus rattus). Although it is unclear whether they are non-native, coconut trees are currently the most dominant plant across Palmyra Atoll. They compete with native plant species for space and resources, and are potentially detrimental to seabirds dependent on native vegetation. Black rats are known to predate ground-nesting seabirds and are likely responsible for the lack of burrowing seabird reproduction on Palmyra Atoll. The most notable example of a marine invasive species is the corallimorph (Rhodactis howsei). Although Rhodactis howsei is a native species, it can take advantage of human-altered habitat and significantly change the natural habitat by aggressively outcompeting native corals. Although the

  14. PTTSA Action Plan Report

    International Nuclear Information System (INIS)

    1991-02-01

    The Pre-Tiger Team Self-Assessment (PTTSA) Report identified findings with respect to the way Sandia National Laboratories (SNL), Albuquerque, (including Tonopah Test Range (TTR) and Kauai Test Facility (KTF)) conducts its environment, safety, and health (ES ampersand H) activities. It presented Action Plan Requirements (APR) addressing these findings. The purpose of this PTTSA Action Plan Report is to assist in managing these action plan requirements by collecting, prioritizing, and estimating required resources. The specific objectives addressed by this report include: collection of requirements for the resolution of the findings presented in the PTTSA Report; consolidation of proposed Action Plan Requirements into logical Action Plan groupings for efficiency of resolution; categorization of Action Plans according to severity of the hazards represented by the findings; provision of a basis for long-range planning and issues management; documentation of the status of the proposed corrective actions; establishment of traceability of the corrective action to the original problem or issue; and integration of these plans into the existing ES ampersand H structure. The Action Plans in this report are an intermediate step between the identification of a problem or a finding in the PTTSA Report and the execution of the solution. They consist of requirements for solution, proposed actions, and an estimate of the time and (where applicable) resources required to develop the solution. This report is an input to the process of planning, resource commitment, development, testing, implementation, and maintenance of problem resolution. 2 figs

  15. Meritorious Budget Award: An Opportunity to Enhance Strategic Planning

    Science.gov (United States)

    McKenzie, Anne; Bishop, Anna

    2009-01-01

    In times of economic uncertainty, local budgets undergo increased scrutiny. School boards and district administrators must collaborate to ensure the highest standards of budget development, implementation, and oversight. Those charged with the fiscal management of school districts must gain the public's confidence in their budgeting abilities.…

  16. Planning, design and implementation of the enhancing child ...

    African Journals Online (AJOL)

    The Global-Livestock Collaborative Research Support Program's (GL-CRSP) Child Nutrition Project, a controlled feeding trial in rural Kenya, demonstrated the importance of Animal Source Foods (ASF) for children's micronutrient status and cognitive development. These findings prompted research efforts to understand the ...

  17. Enhancing Assessments of Mental Health Programs and Program Planning

    Science.gov (United States)

    2012-06-01

    CAPT Sara Kass, Deputy Chief, Wounded Ill and Injured, U.S. Navy, PowerPoint briefing, April 4, 2011. Slide 66. Navy Defines PTSD Treatment...Washington, DC: U.S. Department of Defense. Dohrenwend, Bruce P., J. Blake Turner, Nicholas A. Turse, Ben G. Adams, Karestan C. Koenen and Randall...Simon Wessely. 2005. Shell Shock to PTSD: Military Psychiatry from 1900 to the Gulf War. Hove: Psychology Press. Kass, CAPT Sara , Deputy Chief

  18. Contingency planning: preparation of contingency plans

    DEFF Research Database (Denmark)

    Westergaard, J M

    2008-01-01

    . The risk of introducing disease pathogens into a country and the spread of the agent within a country depends on a number of factors including import controls, movement of animals and animal products and the biosecurity applied by livestock producers. An adequate contingency plan is an important instrument...... in the preparation for and the handling of an epidemic. The legislation of the European Union requires that all Member States draw up a contingency plan which specifies the national measures required to maintain a high level of awareness and preparedness and is to be implemented in the event of disease outbreak....... This paper describes the main elements to be included in the contingency plans submitted by Member States to the European Commission for approval....

  19. Wilderness fire management planning guide

    Science.gov (United States)

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  20. Utility planning for decommissioning

    International Nuclear Information System (INIS)

    Williams, D.H.

    1982-01-01

    Though the biggest impact on a utility of nuclear power plant decommissioning may occur many years from now, procrastination of efforts to be prepared for that time is unwarranted. Foresight put into action through planning can significantly affect that impact. Financial planning can assure the recovery of decommissioning costs in a manner equitable to customers. Decision-making planning can minimize adverse affects of current decisions on later decommissioning impacts and prepare a utility to be equipped to make later decommissioning decisions. Technological knowledge base planning can support all other planning aspects for decommissioning and prepare a utility for decommissioning decisions. Informed project planning can ward off potentially significant pitfalls during decommissioning and optimize the effectiveness of the actual decommissioning efforts

  1. Planning Practice and Research

    DEFF Research Database (Denmark)

    2013-01-01

    Urban planning has dramatically shifted when compared with its former logics and styles. Increasingly, the dynamics of large urban agglomerations spanning multiple boundaries put significant pressure on planning institutions to scale up. In this shifting context, how can both planning theory...... and practice co- evolve in adapting to the ever-increasing transformation of cities and urban regions? In this context, Planning Practice and Research (PPR) is seeking perspectives from the young academic community in planning. We propose to publish at least one special edition of PPR with a number of short...... papers from Young Academics. The contributions should address the question of how planning theory and practice can respond to the increasing complexity of cities and regions....

  2. Practical Planning in COLLAGE

    Science.gov (United States)

    Lansky, Amy L.; Getoor, Lise C.; Friedland, Peter (Technical Monitor)

    1994-01-01

    COLLAGE is a domain-independent planner that differs from traditional planners in two key ways: (1) it uses a diverse and extendible set of (it action-based) plan constructions methods; and (2) it utilizes a technique called (it localization) to partition the planning problem into smaller (and potentially interacting) sub problems. In this paper, we describe these features and how they are exploited in two different real-world planning domains. The first domain, building construction planning, has served as a framework for us to investigate how localization can improve scalability. The second domain, data analysis planning, benefits from COLLAGE's unique plan construction and representation methods. In addition, we describe extensions that were necessary to tackle these real-world problems.

  3. Epistemic and Doxastic Planning

    DEFF Research Database (Denmark)

    Jensen, Martin Holm

    on mathematics and computer science. Planning is the mental capacity that allow us to predict the outcome of our actions, thereby enabling us to exhibit goal-directed behaviour. We often make use of planning when facing new situations, where we cannot rely on entrenched habits, and the capacity to plan...... is therefore closely related to the reflective system of humans. Logic is the study of reasoning. From certain fixed principles logic enables us to make sound and rational inferences, and as such the discpline is virtually impossible to get around when working with AI. The basis of automated planning, the term...... and dynamics, that is, systems that allow us to formally reason about these aspects. By letting these elements be used in a planning context, we obtain a system that extends the degree to which goaldirected behaviour can, at present, be captured by automated planning. In this thesis we concretely apply dynamic...

  4. Planning Public Transport

    DEFF Research Database (Denmark)

    Andersen, Jonas Lohmann Elkjær; Landex, Alex

    2009-01-01

    This good practice guide is composed for the master course 13120 Public Transport Planning held at the Department of Transport, Technical University of Denmark. It is intended to use as guide in the different planning aspects and assignments of the course. Since the course is about the planning...... of new public transport infrastructure this guide also focuses on the planning of new infrastructure. Furthermore, the new infrastructure in the course is expected to be a light rail and even though this guide aims at being general for public transport some of the issues evidently become more relevant...... will enable a capability for planning both bus and rail. The guide is build as a full sketch investigation of a new public transport project ranging chronological from project clarification to physical and timetable planning to traffic modeling and project appraisal. The same steps that are expected...

  5. Business plan competition

    CERN Multimedia

    2007-01-01

    "Venture – Companies for tomorrow" is a business plan competition, which supports students and other junior entrepreneurs in developing their business plans. The sixth edition of the competition is now taking place. Venture 2008 highlights: - prize money totalling CHF 150’000; - possibility to optimize business ideas and business plans with the help of experienced coaches: around 200 coaches are available, with a wide range of backgrounds, entrepreneurs as well as venture capitalists; -\tpossibility to present business ideas and business plans to potential investors ("Investor Days" - 17 January and 7 May); - active involvement in the start-up community; -\tcontribution to potential independence. The competition consists of two phases: Phase I, Business idea, Deadline for submission of business idea: 5 December 2007 (online at http://www.venture.ch). Award Ceremony: 17 January 2008 Phase II, Business plan Deadline for submission of business plan: 2 April 2008 (online at...

  6. Pandemic influenza planning, United States, 1978-2008.

    Science.gov (United States)

    Iskander, John; Strikas, Raymond A; Gensheimer, Kathleen F; Cox, Nancy J; Redd, Stephen C

    2013-06-01

    During the past century, 4 influenza pandemics occurred. After the emergence of a novel influenza virus of swine origin in 1976, national, state, and local US public health authorities began planning efforts to respond to future pandemics. Several events have since stimulated progress in public health emergency planning: the 1997 avian influenza A(H5N1) outbreak in Hong Kong, China; the 2001 anthrax attacks in the United States; the 2003 outbreak of severe acute respiratory syndrome; and the 2003 reemergence of influenza A(H5N1) virus infection in humans. We outline the evolution of US pandemic planning since the late 1970s, summarize planning accomplishments, and explain their ongoing importance. The public health community's response to the 2009 influenza A(H1N1)pdm09 pandemic demonstrated the value of planning and provided insights into improving future plans and response efforts. Preparedness planning will enhance the collective, multilevel response to future public health crises.

  7. IDC Integrated Master Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  8. Family planning for refugees.

    Science.gov (United States)

    1979-01-01

    In response to a recent influx of Vietnamese refugees and their settlement in Kai Tak camp the Family Planning Association of Hong Kong (FPAHK) promoted family planning and supplied contraceptives. FPAHK field workers organized film shows and talks on family planning on 3 consecutive days for 4000 refugees. Most of the refugees were transferred to the Shamshuipo camp to await resettlement in foreign countries. The FPAHK have begun recruiting acceptors in that camp.

  9. China SLAT Plan Template

    Energy Technology Data Exchange (ETDEWEB)

    Dietrich, Richard E. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-07-01

    This document serves as the System-Level Acceptance Test (SLAT) Plan for Site Name, City, Country. This test plan is to provide independent testing of the Radiation Detection System (RDS) installed at Site Name to verify that Customs has been delivered a fully-functioning system as required by all contractual commitments. The system includes all installed hardware and software components. The SLAT plan will verify that separate components are working individually and collectively from a system perspective.

  10. Marketing plan of l'Avellà

    OpenAIRE

    Kalashnikova, Ekaterina

    2017-01-01

    Treball Final de Grau. Grau en Administració d'Empreses. Codi: AE1049. Curs acadèmic 2016/2017 This work is part of the Tourism Excellence Plan for the Inter-Municipal Association of Catí, Culla, Benassal and Ares del Maestrat launched by the Valencian Tourism Agency and the Diputación de Castellón in 2017, the objective of which is to improve the competitiveness of these tourist destinations of the interior Castellon. With the development of this Plan it is intended to enhance...

  11. Software Engineering Improvement Activities/Plan

    Science.gov (United States)

    2003-01-01

    bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14). Work accomplishments included development, evaluation, and enhancement of a software cost model, performing literature search and evaluation of software tools available for code analysis and requirements analysis, and participating in other relevant software engineering activities. Monthly reports were submitted. This support was provided to the Flight Software Group/ED 1 4 in accomplishing the software engineering improvement engineering activities of the Marshall Space Flight Center (MSFC) Software Engineering Improvement Plan.

  12. Natural and accelerated bioremediation research program plan

    International Nuclear Information System (INIS)

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE's Office of Environmental Management (EM). The program builds on OHER's tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER's and Office of Energy Research's (OER's) commitment to supporting DOE's environmental management mission and the belief that bioremediation is an important part of the solution to DOE's environmental problems

  13. Emerging technologies planning guide, 1993 edition

    Energy Technology Data Exchange (ETDEWEB)

    1992-11-01

    Information system technology enhancements during the next five years are expected to provide some of the most significant individual and organization work improvements ever made in the office environment. This guide is an aid to planning these technologies and assessing their roles in improving the effectiveness of Headquarters programs. Their implementation will cost-effectively support Departmental operations and the National Energy Strategy. At the hear of this process is an understanding of the relationship which exists between technology introduction and the planning, budgeting and acquisition process. The 1993 edition of this guide covers the 1993--1997 time frame.

  14. Second mid-term business plan results

    International Nuclear Information System (INIS)

    Kusakabe, Masashi; Matsushita, Satoru; Miyahara, Nobuyuki

    2011-01-01

    This feature presented the second mid-term business plan results of National Institute of Radiological Sciences (NIRS). NIRS started its second five-year-term project in 2006, focusing on radiation life science research, and radiation protection and emergency medicine. The radiation life science research had been conducted at research centers on heavy charged particle therapy for cancer treatment, assessment of radiation effects for radiotherapy, and molecular imaging for early diagnosis and treatment planning. NIRS also provided international open laboratory for experts of many fields to collaborate to enhance the levels of radiological sciences. Fundamental technology center had supported research centers through technology development. (T. Tanaka)

  15. Public Participation Plan

    International Nuclear Information System (INIS)

    1993-07-01

    The purpose of this Public Participation Plan is to describe the US Department of Energy's (DOE) plan for involving the public in the decision-making process for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The plan describes how the DOE will meet the public participation requirements of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, as amended, and of the National Environmental Policy Act (NEPA) of 1969. It includes the UMTRA Project Office plans for complying with DOE Order 5440.1D and for implementing the DOE's Public Participation Policy for Environmental Restoration and Waste Management (1992) and Public Participation Guidance for Environmental Restoration and Waste Management (1993)

  16. Planning and Foucault

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Richardson, Tim

    In this paper we argue that the use of the communicative theory of Jürgen Habermas in planning theory is problematic because it hampers an understanding of how power shapes planning. We posit an alternative approach based on the power analytics of Michel Foucault which focuses on "what is actually...... done", as opposed to Habermas`  focus on "what should be done". We discuss how the Foucauldian stance problematises planning, asking difficult questions about the treatment of legitimacy, rationality, knowledge and spatiality. We conclude that Foucault offers a type of analytic planning theory which...

  17. Planning and Foucault

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Richardson, Tim

    2002-01-01

    In this paper we argue that the use of the communicative theory of Jürgen Habermas in planning theory is problematic because it hampers an understanding of how power shapes planning. We posit an alternative approach based on the power analytics of Michel Foucault which focuses on ?what is actually...... done?, as opposed to Habermas?s focus on ?what should be done?. We discuss how the Foucauldian stance problematises planning, asking difficult questions about the treatment of legitimacy, rationality, knowledge and spatiality. We conclude that Foucault offers a type of analytic planning theory which...

  18. Fund management plan

    International Nuclear Information System (INIS)

    1984-08-01

    This revision of the Fund Management Plan updates the original plan published in May 1983. It is derived from and supplements the Mission Plan of the Office of Civilian Radioactive Waste Management. A major purpose in preparing this Plan is to inform the public about management of the Nuclear Waste Fund and the Interim Storage Fund. The purpose of the Interim Storage Fund is to finance the provision of the Federal interim storage capacity of up to 1900 metric tons of spent nuclear fuel. The Nuclear Waste Fund is a separate account for all revenues and expenditures related to the geological disposal and monitored retrieval storage of civilian radioactive waste

  19. Energy planning in Spain

    International Nuclear Information System (INIS)

    Cortina Garcia, J.

    1995-01-01

    This report aims to describe energy planning in Spain. It briefly analyses the three completed national energy plans (Plan Energetico Nacional, PEN). The fourth PEN 1991-2000 is analysed in detail, by reference to its objectives and characteristics and to developments during its first five years in operation. The Ministry of Industry and Energy has updated PEN en 1995, almost halfway through its period, and this is also summarised. Finally, there are some reflections on the future of energy planning. (Author) 46 refs

  20. Business Plans For Dummies

    CERN Document Server

    Tiffany, Paul; Barrow, Colin

    2011-01-01

    A full updated and extended second edition of an established UK bestseller Business Plans For Dummies 2nd Edition features new and updated information on formulating a solid business plan to build a secure business - even in an economic downturn. Complete with a brand new business plan template to get you started this expert guide offers fresh advice on reading the competitive marketplace and assessing your business in the current economic climate. It walks you step-by-step through every aspect of planning achievable business goals and diversification strategies, identifying trends, exploring

  1. Publication planning 101.

    Science.gov (United States)

    Sismondo, Sergio; Nicholson, Scott Howard

    2009-01-01

    Publication planning is the sub-industry to the pharmaceutical industry that does the organizational and practical work of shaping pharmaceutical companies' data and turning it into medical journal articles. Its main purpose is to create and communicate scientific information to support the marketing of products. This report is based mostly on information presented at the 2007 annual meeting of the International Society of Medical Planning Professionals, including a workshop entitled "Publication Planning 101/201", attended by one of us. We provide some analysis of the role of publication planning in medical publishing, and its implications for the structuring of medical knowledge.

  2. Strategic planning for neuroradiologists.

    Science.gov (United States)

    Berlin, Jonathan W; Lexa, Frank J

    2012-08-01

    Strategic planning is becoming essential to neuroradiology as the health care environment continues to emphasize cost efficiency, teamwork and collaboration. A strategic plan begins with a mission statement and vision of where the neuroradiology division would like to be in the near future. Formalized strategic planning frameworks, such as the strengths, weaknesses, opportunities and threats (SWOT), and the Balanced Scorecard frameworks, can help neuroradiology divisions determine their current position in the marketplace. Communication, delegation, and accountability in neuroradiology is essential in executing an effective strategic plan. Copyright © 2012 Elsevier Inc. All rights reserved.

  3. Planning Complex Projects Automatically

    Science.gov (United States)

    Henke, Andrea L.; Stottler, Richard H.; Maher, Timothy P.

    1995-01-01

    Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

  4. Route Availabililty Planning Tool -

    Data.gov (United States)

    Department of Transportation — The Route Availability Planning Tool (RAPT) is a weather-assimilated decision support tool (DST) that supports the development and execution of departure management...

  5. Reasoning about plans

    CERN Document Server

    Allen, James; Pelavin, Richard; Tenenberg, Josh

    1991-01-01

    This book presents four contributions to planning research within an integrated framework. James Allen offers a survey of his research in the field of temporal reasoning, and then describes a planning system formalized and implemented directly as an inference process in the temporal logic. Starting from the same logic, Henry Kautz develops the first formal specification of the plan recognition process and develops a powerful family of algorithms for plan recognition in complex situations. Richard Pelavin then extends the temporal logic with model operators that allow the representation to

  6. US ITER Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  7. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden concerning the plans for the final disposal of the radioactive waste products of the nuclear power. Part 2 describes the waste facilities in details. The layouts and estimated costs are presented. The decomissioning of nuclear power plants and the postponement of it is discussed. (G.B.)

  8. When daily planning improves employee performance: The importance of planning type, engagement, and interruptions.

    Science.gov (United States)

    Parke, Michael R; Weinhardt, Justin M; Brodsky, Andrew; Tangirala, Subrahmaniam; DeVoe, Sanford E

    2018-03-01

    Does planning for a particular workday help employees perform better than on other days they fail to plan? We investigate this question by identifying 2 distinct types of daily work planning to explain why and when planning improves employees' daily performance. The first type is time management planning (TMP)-creating task lists, prioritizing tasks, and determining how and when to perform them. We propose that TMP enhances employees' performance by increasing their work engagement, but that these positive effects are weakened when employees face many interruptions in their day. The second type is contingent planning (CP) in which employees anticipate possible interruptions in their work and plan for them. We propose that CP helps employees stay engaged and perform well despite frequent interruptions. We investigate these hypotheses using a 2-week experience-sampling study. Our findings indicate that TMP's positive effects are conditioned upon the amount of interruptions, but CP has positive effects that are not influenced by the level of interruptions. Through this study, we help inform workers of the different planning methods they can use to increase their daily motivation and performance in dynamic work environments. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  9. Health professional's role in disaster planning: a strategic management approach.

    Science.gov (United States)

    Meyer, M U; Graeter, C J

    1995-05-01

    1. The Strategic Management for Total Quality in Health Care model incorporates strategic management methods and total quality principles to enhance management of complex, interdisciplinary projects. 2. The purpose of disaster planning is to provide an effective and efficient plan to prevent personal injury and limit property damage and capital losses, as well as return to full production after a disaster. 3. Participation in disaster response planning provides health professionals with an opportunity to demonstrate the benefits they can provide for meeting their company's business needs. 4. Disaster planning is a complex, interdisciplinary project that requires a strategic management framework to facilitate development of high quality, cost effective programs.

  10. Temporal logic motion planning

    CSIR Research Space (South Africa)

    Seotsanyana, M

    2010-01-01

    Full Text Available In this paper, a critical review on temporal logic motion planning is presented. The review paper aims to address the following problems: (a) In a realistic situation, the motion planning problem is carried out in real-time, in a dynamic, uncertain...

  11. Environmental protection Implementation Plan

    International Nuclear Information System (INIS)

    Holland, R. C.

    1999-01-01

    This ''Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ''Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities

  12. Making a Quit Plan

    Science.gov (United States)

    ... to your quit plan Be healthier Be healthier Save money Save money Smell better Smell better My loved ones My ... songs, plan a movie night with friends, or save up your cigarette money for a special treat when you reach a ...

  13. Graphite technology development plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-07-01

    This document presents the plan for the graphite technology development required to support the design of the 350 MW(t) Modular HTGR within the US National Gas-Cooled Reactor Program. Besides descriptions of the required technology development, cost estimates, and schedules, the plan also includes the associated design functions and design requirements.

  14. Soybean Production Lesson Plan.

    Science.gov (United States)

    Carlson, Keith R.

    These lesson plans for teaching soybean production in a secondary or postsecondary vocational agriculture class are organized in nine units and cover the following topics: raising soybeans, optimum tillage, fertilizer and lime, seed selection, pest management, planting, troubleshooting, double cropping, and harvesting. Each lesson plan contains…

  15. The Career Planning Essay.

    Science.gov (United States)

    Lyon, Douglas W.; Kirby, Eric G.

    2000-01-01

    Describes a career planning essay as an opportunity for students to evaluate career goals; reflect on the relationship of values, career goals, and life goals; and develop an action plan. Provides instructional tips about timing, setup, and feedback for this exercise. (SK)

  16. Knowledge Intensive Planning

    Science.gov (United States)

    1988-07-01

    How do I list all the files in the directory named koala ? In (1), during plan selection, KIP selects the stored plan for the goal of listing the...involved. However, if the user had asked the following question: (2) How do I list all the files in J im’s directory named koala ? KIP would have

  17. Fermilab Program and Plans

    Energy Technology Data Exchange (ETDEWEB)

    Denisov, Dmitri [Fermilab

    2014-01-01

    This article is a short summary of the talk presented at 2014 Instrumentation Conference in Novosibirsk about Fermilab's experimental program and future plans. It includes brief description of the P5 long term planning progressing in US as well as discussion of the future accelerators considered at Fermilab.

  18. Statistical Analysis Plan

    DEFF Research Database (Denmark)

    Ris Hansen, Inge; Søgaard, Karen; Gram, Bibi

    2015-01-01

    This is the analysis plan for the multicentre randomised control study looking at the effect of training and exercises in chronic neck pain patients that is being conducted in Jutland and Funen, Denmark. This plan will be used as a work description for the analyses of the data collected....

  19. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... All A-Z health topics Find Help Get breastfeeding help Get health care Get health insurance Get help with family planning ... All A-Z health topics Find Help Get breastfeeding help Get health care Get health insurance Get help with family planning ...

  20. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  1. Planning for Office Automation.

    Science.gov (United States)

    Sherron, Gene T.

    1982-01-01

    The steps taken toward office automation by the University of Maryland are described. Office automation is defined and some types of word processing systems are described. Policies developed in the writing of a campus plan are listed, followed by a section on procedures adopted to implement the plan. (Author/MLW)

  2. Practical Laboratory Planning.

    Science.gov (United States)

    Ferguson, W. R.

    This book is intended as a guide for people who are planning chemistry and physics research laboratories. It deals with the importance of effective communication between client and architect, the value of preliminary planning, and the role of the project officer. It also discusses the size and layout of individual laboratories, the design of…

  3. Practical SPI Planning

    Science.gov (United States)

    Landaeta, José Francisco; García, Javier; Amescua, Antonio

    This paper presents a practical procedure named P4SPI for planning, monitoring and closing an SPI. Planning activities are performed using PMBOK's process areas as a reference; monitoring activities using Six Sigma tools and techniques and closing activities using gathering qualitative and quantitative information about the SPI Implementation. These activities are supported by office templates.

  4. Creating a Marketing Plan.

    Science.gov (United States)

    Sevier, Robert A.

    1989-01-01

    A guide to developing a college marketing plan defines key marketing terms, outlines the development of a plan (including institutional analysis, market research, strategy formation and execution, and program evaluation), and provides a list of important principles with which to operate a program. (MSE)

  5. Adaptive path planning: Algorithm and analysis

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Pang C.

    1993-03-01

    Path planning has to be fast to support real-time robot programming. Unfortunately, current planning techniques are still too slow to be effective, as they often require several minutes, if not hours of computation. To alleviate this problem, we present a learning algorithm that uses past experience to enhance future performance. The algorithm relies on an existing path planner to provide solutions to difficult tasks. From these solutions, an evolving sparse network of useful subgoals is learned to support faster planning. The algorithm is suitable for both stationary and incrementally-changing environments. To analyze our algorithm, we use a previously developed stochastic model that quantifies experience utility. Using this model, we characterize the situations in which the adaptive planner is useful, and provide quantitative bounds to predict its behavior. The results are demonstrated with problems in manipulator planning. Our algorithm and analysis are sufficiently general that they may also be applied to task planning or other planning domains in which experience is useful.

  6. Emergency plan belgian experience

    International Nuclear Information System (INIS)

    Clymans, A.

    1989-01-01

    The Chernobyl disaster prompted authorities in Belgium to carry out a comprehensive review of all emergency plans and, in particular, those designed specifically for nuclear accidents. This review was aimed at determining what type of plans existed and to what extent such plans were operational. This paper sets out to present a broad overview of different aspects of this problem: organization of public emergency plans, co-ordination of operations, merits and demerits of centralization as opposed to decentralization, planning zones, obligation to release information to the public and relations with the media, and finally the international dimension to the problem. The author expresses the hope that the latter area will inspire practical suggestions [fr

  7. Transportation Institutional Plan

    Energy Technology Data Exchange (ETDEWEB)

    1986-08-01

    This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.

  8. Can Complexity be Planned?

    Directory of Open Access Journals (Sweden)

    Ilona Koutny

    2015-04-01

    Full Text Available The long accepted complexity invariance of human languages has become controversial within the last decade. In investigations of the problem, both creole and planned languages have often been neglected. After a presentation of the scope of the invariance problem and the proposition of the natural to planned language continuum, this article will discuss the contribution of planned languages. It will analyze the complexity of Esperanto at the phonological, morphological, syntactic and semantic levels, using linguistic data bases. The role of the L2 speech community and development of the language will also be taken into account when discussing the endurance of the same level of simplicity of this planned international language. The author argues that complexity can be variable and to some extent planned and maintained.

  9. Health Workforce Planning

    Science.gov (United States)

    Al-Sawai, Abdulaziz; Al-Shishtawy, Moeness M.

    2015-01-01

    In most countries, the lack of explicit health workforce planning has resulted in imbalances that threaten the capacity of healthcare systems to attain their objectives. This has directed attention towards the prospect of developing healthcare systems that are more responsive to the needs and expectations of the population by providing health planners with a systematic method to effectively manage human resources in this sector. This review analyses various approaches to health workforce planning and presents the Six-Step Methodology to Integrated Workforce Planning which highlights essential elements in workforce planning to ensure the quality of services. The purpose, scope and ownership of the approach is defined. Furthermore, developing an action plan for managing a health workforce is emphasised and a reviewing and monitoring process to guide corrective actions is suggested. PMID:25685381

  10. The 1986 action plan

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Discussion covers the actions that must be taken and the standards to be met to achieve the goals of the 20 year plan. Bonneville Power Administration (BPA) has agreed to develop detailed work plans for achieving the objects of the plan, through a public process in consultation with the Council and interested parties. BPA work plans and activities are outlined. The Council's plan emphasizes the following priorities: (1) a stronger regional role for BPA; (2) development of the capability to acquire conservation on a regional basis; (3) strategies to make better use of the hydropower system; (4) building conservation capability in all sectors; (5) demonstrating the cost effectiveness of renewable resources so they are available before the region has to build new generating resources; (6) allocation of costs for two unfinished nuclear power plants and elimination of barriers to their completion; and (7) a study of electric power sales and purchases between regions

  11. Family planning in Africa.

    Science.gov (United States)

    1968-01-01

    More than 100 delegates from many African countries attended a seminar on the role of family planning in African development, which was held at the University College in Nairobi, Kenya from December 12-16, 1967. This article outlines some courses of action suggested at the session dealing with the training of family planning personnel. Medical schools should ideally include family planning in their curricula and should be encouraged to set up family planning clinics as part of the teaching facilities. African students studying overseas should adapt their learning to their own countries. General practitioners need at least a 3-day intensive course in family planning. The training of paramedical personnel is also discussed.

  12. KAERI Radiological Emergency Plan

    Energy Technology Data Exchange (ETDEWEB)

    Oui, Khang Byung; Lee, Goan Yup; Lee, Jong Tai

    2004-06-15

    The Radiological Emergency Plan of KAERI is to draw up based on the Civil Defence Law, the Disaster and Safety Management Law, the Act of Physical Protection and Emergency Preparedness in Nuclear Facilities, the National Radiological Emergency Plan, and made reference to the DOE order and IAEA TECDOC etc. This plan describes the preventive measures, emergency response, re-entry and restoration to ensure adequate response capabilities to the nuclear accidents which would cause a significant risk to the KAERI staffs and the public near to the site. And the Operation of Radiological Emergency Management System is included in this plan to test the effectiveness of this plan and to improve the response capabilities of the emergency staffs against nuclear accidents.

  13. Nonlinear adaptive models for speech enhancement algorithms

    Czech Academy of Sciences Publication Activity Database

    Koula, Ivan; Zezula, R.

    2007-01-01

    Roč. 42, č. 1 (2007), s. 138-145 ISSN 1738-6438 R&D Projects: GA ČR(CZ) GA102/06/1233; GA AV ČR(CZ) 1ET301710509 Institutional research plan: CEZ:AV0Z20670512 Keywords : noise measurement * speech enhancement * neural nets Subject RIV: JA - Electronics ; Optoelectronics, Electrical Engineering

  14. Using Interdisciplinary Arts Education to Enhance Learning

    Science.gov (United States)

    Lorimer, Maureen Reilly

    2009-01-01

    Amid crossing currents of educational expectations pressing on principals, the author advocates for enhancing inclusion of the visual and performing arts. Although electives and clubs provide arts exposure to a selected few, many students do not receive consistent and high-quality arts experiences. Carefully planned, interdisciplinary arts…

  15. From student feedback to institutional quality enhancement ...

    African Journals Online (AJOL)

    From student feedback to institutional quality enhancement initiatives that focus on supporting staff and students. ... reasons for a particular set of circumstances, planning and implementation of changes in a generally fluid situation, collection of evidence for outcomes, and provision of succinct reports to stakeholders.

  16. Plans of LHD divertor experiment

    International Nuclear Information System (INIS)

    Ohyabu, Nobuyoshi; Komori, Akio; Sagara, Akio; Noda, Nobuaki; Motojima, Osamu

    1996-01-01

    Scenarios of the LHD divertor experiment are presented. In the LHD divertor experimental program, various innovative divertor concepts and technologies, developed during its design phase will be utilized to improve the plasma performance. Two divertor operational scenarios (confinement improvement by generating high temperature divertor plasma and simultaneous achievement of radiative cooling and H-mode-like confinement improvement) are among them. Local island divertor geometry has also been proposed. This new divertor has been successfully tested in the CHS device and is planned to be installed in the LHD device. In addition, technological development of new efficient hydrogen pumping schemes (carbon sheet pump and membrane pump) are being pursued for enhancement of the divertor control capability. (author)

  17. From Server to Desktop: Capital and Institutional Planning for Client/Server Technology.

    Science.gov (United States)

    Mullig, Richard M.; Frey, Keith W.

    1994-01-01

    Beginning with a request for an enhanced system for decision/strategic planning support, the University of Chicago's biological sciences division has developed a range of administrative client/server tools, instituted a capital replacement plan for desktop technology, and created a planning and staffing approach enabling rapid introduction of new…

  18. Wetland Resources Action Planning (WRAP) toolkit

    DEFF Research Database (Denmark)

    Bunting, Stuart W.; Smith, Kevin G.; Lund, Søren

    2013-01-01

    The Wetland Resources Action Planning (WRAP) toolkit is a toolkit of research methods and better management practices used in HighARCS (Highland Aquatic Resources Conservation and Sustainable Development), an EU-funded project with field experiences in China, Vietnam and India. It aims...... to communicate best practices in conserving biodiversity and sustaining ecosystem services to potential users and to promote the wise-use of aquatic resources, improve livelihoods and enhance policy information....

  19. National Biofuels Action Plan, October 2008

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2008-10-01

    To help industry achieve the aggressive national goals, Federal agencies will need to continue to enhance their collaboration. The Biomass Research and Development (R&D) Board was created by Congress in the Biomass Research and Development Act of 2000. The National Biofuels Action Plan outlines areas where interagency cooperation will help to evolve bio-based fuel production technologies from promising ideas to competitive solutions.

  20. Interior design. Mastering the master plan.

    Science.gov (United States)

    Mesbah, C E

    1995-10-01

    Reflecting on the results of the survey, this proposed interior design master planning process addresses the concerns and issues of both CEOs and facility managers in ways that focus on problem-solving strategies and methods. Use of the interior design master plan process further promotes the goals and outcomes expressed in the survey by both groups. These include enhanced facility image, the efficient selection of finishes and furnishings, continuity despite staff changes, and overall savings in both costs and time. The interior design master plan allows administrators and facility managers to anticipate changes resulting from the restructuring of health care delivery. The administrators and facility managers are then able to respond in ways that manage those changes in the flexible and cost-effective manner they are striving for. This framework permits staff members to concentrate their time and energy on the care of their patients--which is, after all, what it's all about.

  1. ICT applications enhancing energy efficiency

    Directory of Open Access Journals (Sweden)

    A. G. Matani

    2016-06-01

    Full Text Available Computers, laptops and mobile devices – information technology (IT accounts for 2% of human greenhouse gas emissions worldwide, as evidenced in a study by Global Action Plan, a UK based environmental organization. This figure can be reduced if the green segment, or Green IT, continues to grow. Energy can also be saved through cloud computing, namely the principle of outsourcing the programs and functions of one’s own computer to service providers over the internet. This also means sharing storage capacity with others. This paper highlights the impact of information technology applications towards enhancing energy efficiency of the systems.

  2. EMSL Strategic Plan 2008

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, Allison A.

    2008-08-15

    This Strategic Plan is EMSL’s template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges of the Department of Energy and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOE’s Office of Biological and Environmental Research, and other key stakeholders. This Strategic Plan is fully aligned with the strategic plans of DOE and its Office of Science. We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Strategic Plan should be viewed as a living document for which we will continually evaluate changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly.

  3. Partners in family planning.

    Science.gov (United States)

    1994-12-01

    Studies of the Africa OR/TA Project and other Cooperating Agencies suggest that support of family planning by traditional health practitioners (THPs), traditional birth attendants (TBAs), Islamic religious leaders, and male opinion leaders (MOLs) can result in an increase in the availability of family planning services in the community. A study in Kenya shows that 100 trained THPs who were actively involved in family planning (i.e., distributors of condoms, oral contraceptives, and primary health care drugs) increased contraceptive use in Siaya and Kakamega districts from 7% to 15% and from 14% to 34%, respectively. Contraceptive use did not change in the 2 control areas. Two years after TBAs underwent training in family planning promotion, the proportion of women who named TBAs as their source of family planning information increased from 2% to 18%. In The Gambia, integration of Islamic religious leaders into family planning promotion activities resulted in an increase of current modern contraceptive method use from 9% to 20% for males and from 9% to 26% for females. Involvement of 69 MOLs has increased knowledge of family planning methods in Nkambe, Cameroon. For example, among males, knowledge about the condom increased from 52% to 81% and knowledge about spermicides increased from 12% to 44%. The corresponding figures for women were 47% to 72% and 17% to 42%, respectively.

  4. AECB strategic plan 1999

    International Nuclear Information System (INIS)

    1999-03-01

    This strategic plan provides the direction and focus required to successfully carry out our mandate in an efficient and effective manner over the next two to three years. It gives broad corporate direction by identifying where efforts need to be focussed, and therefore provides guidance for setting priorities and allocating resources. While we cannot ignore any aspect of our mandate, we must recognize that we will always have more work to do than can be accomplished within the resources available to us. Therefore we must set priorities and develop appropriate management systems to ensure that our major efforts and our resources are being directed towards those priorities. Our strategic plan is not a static document. We will always be faced with new challenges, and our strategies for meeting those challenges will also have to change. Therefore our strategic plan must be seen as a guide that reflects both the ever-changing environment and our ability to deal with new or evolving changes effectively. This plan is not intended to be a detailed operational plan. Each directorate must develop its own operational plans and procedures based on the directions in this strategic plan, and on corporate priorities and policies. (author)

  5. Public affairs plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies.

  6. Public affairs plan

    International Nuclear Information System (INIS)

    1994-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy's (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies

  7. Underground space planning in Helsinki

    Directory of Open Access Journals (Sweden)

    Ilkka Vähäaho

    2014-10-01

    Full Text Available This paper gives insight into the use of underground space in Helsinki, Finland. The city has an underground master plan (UMP for its whole municipal area, not only for certain parts of the city. Further, the decision-making history of the UMP is described step-by-step. Some examples of underground space use in other cities are also given. The focus of this paper is on the sustainability issues related to urban underground space use, including its contribution to an environmentally sustainable and aesthetically acceptable landscape, anticipated structural longevity and maintaining the opportunity for urban development by future generations. Underground planning enhances overall safety and economy efficiency. The need for underground space use in city areas has grown rapidly since the 21st century; at the same time, the necessity to control construction work has also increased. The UMP of Helsinki reserves designated space for public and private utilities in various underground areas of bedrock over the long term. The plan also provides the framework for managing and controlling the city's underground construction work and allows suitable locations to be allocated for underground facilities. Tampere, the third most populated city in Finland and the biggest inland city in the Nordic countries, is also a good example of a city that is taking steps to utilise underground resources. Oulu, the capital city of northern Finland, has also started to ‘go underground’. An example of the possibility to combine two cities by an 80-km subsea tunnel is also discussed. A new fixed link would generate huge potential for the capital areas of Finland and Estonia to become a real Helsinki-Tallinn twin city.

  8. 2014 Enhanced LAW Glass Property-Composition Models, Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    Muller, Isabelle [The Catholic Univ. of America, Washington, DC (United States); Pegg, Ian L. [The Catholic Univ. of America, Washington, DC (United States); Joseph, Innocent [Energy Solutions, Salt Lake City, UT (United States); Gilbo, Konstantin [The Catholic Univ. of America, Washington, DC (United States)

    2015-10-28

    This report describes the results of testing specified by the Enhanced LAW Glass Property-Composition Models, VSL-13T3050-1, Rev. 0 Test Plan. The work was performed in compliance with the quality assurance requirements specified in the Test Plan. Results required by the Test Plan are reported. The te4st results and this report have been reviewed for correctness, technical adequacy, completeness, and accuracy.

  9. EMSL Contribution Plan

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, Allison A.

    2008-12-01

    This Contribution Plan is EMSL’s template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges faced by the Department of Energy (DOE) and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOE’s Office of Biological and Environmental Research, and other key stakeholders. This Plan is fully aligned with the strategic plans of DOE, its Office of Science, and the Pacific Northwest National Laboratory (PNNL). We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Plan should be viewed as a living document and we continually evaluate the changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly. This Plan is organized around two sections. Section 1 describes our vision and four strategic outcomes: 1) Scientific Innovation, 2) Capabilities that Transform Science, 3) Outstanding Management and Operations, and Engaged and Proactive Users. These outcomes provide the framework for seven critical actions we must take during the next 3 to 5 years: 1) Establishing leadership in EMSL science themes, 2) building and deploying transformational capabilities, 3) integrating computation with experiment, 4) ensuring EMSL’s workforce meets the scientific challenges of the future, 5) creating partnerships, 6) attracting and engaging users in EMSL’s long-term strategy, and 7) building a research infrastructure that meets emerging scientific needs. Section 2

  10. National Energy Plan II

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    This volume contains the Administration's second National Energy Plan, as required by section 801 of the Department of Energy Organization Act (Public Law 95-91). A second volume will contain an assessment of the environmental trends associated with the energy futures reported here. Detailed appendices to the Plan will be published separately. The eight chapters and their subtitles are: Crisis and Uncertainty in the World Energy Future (The Immediate Crisis and the Continuing Problem, The Emergence of the Energy Problem, The Uncertainties of the World Energy Future, World Oil Prices, Consequences for the U.S.); The U.S. Energy Future: The Implications for Policy (The Near-, Mid-, and Long-Term, The Strategy in Perspective); Conservation (Historical Changes in Energy Use, Post-Embargo Changes - In Detail, Conservation Policies and Programs, The Role of Conservation); Oil and Gas (Oil, Natural Gas); Coal and Nuclear (Coal, Nuclear, Policy for Coal and Nuclear Power); Solar and Other Inexhaustible Energy Sources (Solar Energy, Geothermal, Fusion, A Strategy for Inexhaustible Resources); Making Decisions Promptly and Fairly (Managing Future Energy Crises: Emergency Planning, Managing the Current Shortfall: The Iranian Response Plan, Managing the Long-Term Energy Problem: The Institutional Framework, Fairness in Energy Policy, Public Participation in the Development of Energy Policy); and NEP-II and the Future (The Second National Energy Plan and the Nation's Energy Future, The Second National Energy Plan and the Economy, Employment and Energy Policy, The Second National Energy Plan and Individuals, The Second National Energy Plan and Capital Markets, and The Second National Energy Plan and the Environment). (ERA citation 04:041097)

  11. MO-B-BRB-00: Optimizing the Treatment Planning Process

    International Nuclear Information System (INIS)

    2015-01-01

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  12. MO-B-BRB-00: Optimizing the Treatment Planning Process

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  13. Framework for Maintenance Planning

    DEFF Research Database (Denmark)

    Soares, C. Guedes; Duarte, J. Caldeira; Garbatov, Y.

    2010-01-01

    the design and during the whole life span of operational use, within an integrated framework founded on risk and reliability based techniques. The document addresses designers, decision makers and professionals responsible for or involved in establishing maintenance plans. The purpose of this document...... is to present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  14. Environmental monitoring plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs

  15. Heat pump planning handbook

    CERN Document Server

    Bonin, Jürgen

    2015-01-01

    The Heat Pump Planning Handbook contains practical information and guidance on the design, planning and selection of heat pump systems, allowing engineers, designers, architects and construction specialists to compare a number of different systems and options. Including detailed descriptions of components and their functions and reflecting the current state of technology this guide contains sample tasks and solutions as well as new model calculations and planning evaluations. Also economic factors and alternative energy sources are covered, which are essential at a time of rising heat costs. T

  16. Undecidability in Epistemic Planning

    DEFF Research Database (Denmark)

    Aucher, Guillaume; Bolander, Thomas

    2013-01-01

    Dynamic epistemic logic (DEL) provides a very expressive framework for multi-agent planning that can deal with nondeterminism, partial observability, sensing actions, and arbitrary nesting of beliefs about other agents’ beliefs. However, as we show in this paper, this expressiveness comes...... at a price. The planning framework is undecidable, even if we allow only purely epistemic actions (actions that change only beliefs, not ontic facts). Undecidability holds already in the S5 setting with at least 2 agents, and even with 1 agent in S4. It shows that multi-agent planning is robustly undecidable...

  17. Environmental monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

  18. Complexity Results in Epistemic Planning

    DEFF Research Database (Denmark)

    Bolander, Thomas; Jensen, Martin Holm; Schwarzentruber, Francois

    2015-01-01

    Epistemic planning is a very expressive framework that extends automated planning by the incorporation of dynamic epistemic logic (DEL). We provide complexity results on the plan existence problem for multi-agent planning tasks, focusing on purely epistemic actions with propositional preconditions......-hardness of the plan verification problem, which strengthens previous results on the complexity of DEL model checking....

  19. Role of regional planning organizations in transportation planning across boundaries

    Science.gov (United States)

    2014-06-11

    The Volpe Center conducted research for the Federal Highway Administration Office of Planning that explores the implications of Regional Planning Organizations (RPO) engaging in transportation planning partnerships and projects of megaregions signifi...

  20. FY 2001 Hanford Waste Management Strategic Plan

    International Nuclear Information System (INIS)

    COLLINS, M.S.

    2001-01-01

    We are pleased to present the 2001 Hanford Waste Management Program Strategic Plan. This plan supports the newly developed U. S. Department of Energy Site outcomes strategy. The 2001 Plan reflects current and projected needs for Waste Management Program services in support of Hanford Site cleanup, and updates the objectives and actions using new waste stream oriented logic for the strategic goals: (1) waste treatment/processing, storage, and disposal; (2) interfaces; and (3) program excellence. Overall direction for the Program is provided by the Waste Management Division, Office of the Assistant Manager for Environmental Restoration and Waste Management, U. S. Department of Energy, Richland Operations Office. Fluor Hanford, Inc. is the operating contractor for the program. This Plan documents proactive strategies for planning and budgeting, with a major focus on helping meet regulatory commitments in a timely and efficient manner and concurrently assisting us in completing programs cheaper, better and quicker. Newly developed waste stream oriented logic was incorporated to clarify Site outcomes. External drivers, technology inputs, treatment/processing, storage and disposal strategies, and stream specific strategies are included for the six major waste types addressed in this Plan (low-level waste, mixed low-level waste, contact-handled transuranic waste, remote-handled transuranic waste, liquid waste, and cesium/strontium capsules). The key elements of the strategy are identification and quantification of the needs for waste management services, assessment of capabilities, and development of cost-effective actions to meet the needs and to continuously improve performance. Accomplishment of specific actions as set forth in the Plan depends on continued availability of the required resources and funding. The primary objectives of Plan are: (1) enhance the Waste Management Program to improve flexibility, become more holistic especially by implementing new

  1. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1994-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans

  2. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... email updates Enter email Submit Planning ahead From choosing the crib to finding a pediatrician, you’re ... Need some nursing know-how? These steps and strategies will help soon-to-be-moms make an ...

  3. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing ... decisions. But if you haven’t already thought about breastfeeding, now is a great time. Before your baby is here is the ...

  4. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1992-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides a land use plan for the Hanford Site and presents a picture of what is currently known and anticipated in accordance with DOE Order 4320.1B. Site Development Planning. The HSDP wig be updated annually as future decisions further shape the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  5. Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed

  6. Town and Regional Planning

    African Journals Online (AJOL)

    Town and Regional Planning. Journal Home · ABOUT THIS JOURNAL · Advanced Search · Current Issue · Archives · Journal Home > Vol 64 (2014) >. Log in or Register to get access to full text downloads.

  7. MyPlan

    Data.gov (United States)

    California Department of Resources — MyPlan is a map service designed to be a simple interface to California natural hazard data products produced by the California Natural Resources Agency departments...

  8. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  9. Network planning under uncertainties

    Science.gov (United States)

    Ho, Kwok Shing; Cheung, Kwok Wai

    2008-11-01

    One of the main focuses for network planning is on the optimization of network resources required to build a network under certain traffic demand projection. Traditionally, the inputs to this type of network planning problems are treated as deterministic. In reality, the varying traffic requirements and fluctuations in network resources can cause uncertainties in the decision models. The failure to include the uncertainties in the network design process can severely affect the feasibility and economics of the network. Therefore, it is essential to find a solution that can be insensitive to the uncertain conditions during the network planning process. As early as in the 1960's, a network planning problem with varying traffic requirements over time had been studied. Up to now, this kind of network planning problems is still being active researched, especially for the VPN network design. Another kind of network planning problems under uncertainties that has been studied actively in the past decade addresses the fluctuations in network resources. One such hotly pursued research topic is survivable network planning. It considers the design of a network under uncertainties brought by the fluctuations in topology to meet the requirement that the network remains intact up to a certain number of faults occurring anywhere in the network. Recently, the authors proposed a new planning methodology called Generalized Survivable Network that tackles the network design problem under both varying traffic requirements and fluctuations of topology. Although all the above network planning problems handle various kinds of uncertainties, it is hard to find a generic framework under more general uncertainty conditions that allows a more systematic way to solve the problems. With a unified framework, the seemingly diverse models and algorithms can be intimately related and possibly more insights and improvements can be brought out for solving the problem. This motivates us to seek a

  10. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... baby is here is the best time to learn about the benefits of breastfeeding and make plans ... sections below to watch videos about breastfeeding and learn from other breastfeeding moms. Expand all | Collapse all ...

  11. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... into your life Breastfeeding in daily life: At home and in public Laws that support breastfeeding 10 ... and jobs View all pages in this section Home It's Only Natural Planning ahead It's Only Natural ...

  12. Speed management program plan.

    Science.gov (United States)

    2014-05-01

    Changing public attitudes regarding speeding and speed management will require a comprehensive and concerted effort, involving a wide variety of strategies. This plan identifies six primary focus areas: : A. Data and Data-Driven Approaches, : B. Rese...

  13. Succession planning : phase II.

    Science.gov (United States)

    2008-06-01

    Succession planning is an organizational investment in the future. Institutional : knowledge is a critical ingredient in the culture of an organization, and its intangible : value becomes significant when an organization is faced with the need to pas...

  14. Engineering Forum Strategic Plan

    Science.gov (United States)

    This Strategic Plan highlights the purpose, mission, goals, and objectives of the U.S. Environmental Protection Agency (EPA) Engineering Forum (EF). It sets forth the principles that guide the EF's decision-making, helps clarify the EF's priorities, and...

  15. Benzidine Dyes Action Plan

    Science.gov (United States)

    This Action Plan addresses the use of benzidine-based dyes and benzidine congener-based dyes, both metalized and non-metalized, in products that would result in consumer exposure, such as for use to color textiles.

  16. Asthma action plan

    OpenAIRE

    Public Health Agency

    2014-01-01

    This action plans allow each child (or parent/carer) to record his or her asthma treatment to help manage their asthma when they are well, when their symptoms get worse and when they are suffering an asthma attack.

  17. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... health care Get health insurance Get help with family planning Get help with mental health Find girls' health information Stay Connected Blog Contact us Media inquiries Social media About Us Who we are What we ...

  18. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... It's Only Natural Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing breastfeeding myths Overcoming challenges Finding support Fitting breastfeeding into your life Partner resources Subscribe ...

  19. Technical Assistance Plan (TAP)

    Science.gov (United States)

    A Technical Assistance Plan (TAP) enables community groups to retain the services of an independent technical advisor and to provide resources for a community group to help inform other community members about site decisions.

  20. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... we are What we do Programs and activities Work with us Contact Us Blog Popular topics Vision ... Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing breastfeeding myths Breastfeeding myths in ...

  1. Cancer Nanotechnology Plan

    Science.gov (United States)

    The Cancer Nanotechnology Plan serves as a strategic document to the NCI Alliance for Nanotechnology in Cancer as well as a guiding document to the cancer nanotechnology and oncology fields, as a whole.

  2. Drinking Water Action Plan

    Science.gov (United States)

    EPA's Drinking Water Action Plan serves as a national call to action, urging all levels of government, utilities, community organizations, and other stakeholders to work together to increase the safety and reliability of drinking water.

  3. Climate plan 2004

    International Nuclear Information System (INIS)

    2004-01-01

    The Climate Plan is an action plan drawn up by the French Government to respond to the climate change challenge, first by 2010 (complying with the Kyoto Protocol target), and, secondly, beyond this date. Projections for France show that national emissions could be 10% higher than the Kyoto target in 2010 if no measures are taken. This is particularly due to increasing emissions in the sectors affecting daily life (residential-tertiary sectors, transport, etc.). For this reason, the Climate Plan contains measures affecting all sectors of the economy and the daily life of all French citizens with a view to economizing the equivalent of 54 million tonnes of CO 2 each year by the year 2010, which will help to reverse the trend significantly. Beyond 2010, the Climate Plan sets out a strategy for technological research which will enable France to meet a target of reducing greenhouse gas emissions four or fivefold by 2050. (author)

  4. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... health care Get health insurance Get help with family planning Get help with mental health Find girls' health ... Policy Disclaimers Freedom of Information Act (FOIA) USA.gov ...

  5. Watershed Planning Basins

    Data.gov (United States)

    Vermont Center for Geographic Information — The Watershed Planning Basin layer is part of a larger dataset contains administrative boundaries for Vermont's Agency of Natural Resources. The dataset includes...

  6. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Don't Miss a Beat National Women and Girls HIV/AIDS Awareness Day National Women's Health Week ... family planning Get help with mental health Find girls' health information Stay Connected Blog Contact us Media ...

  7. Inverse planning IMRT

    International Nuclear Information System (INIS)

    Rosenwald, J.-C.

    2008-01-01

    The lecture addressed the following topics: Optimizing radiotherapy dose distribution; IMRT contributes to optimization of energy deposition; Inverse vs direct planning; Main steps of IMRT; Background of inverse planning; General principle of inverse planning; The 3 main components of IMRT inverse planning; The simplest cost function (deviation from prescribed dose); The driving variable : the beamlet intensity; Minimizing a 'cost function' (or 'objective function') - the walker (or skier) analogy; Application to IMRT optimization (the gradient method); The gradient method - discussion; The simulated annealing method; The optimization criteria - discussion; Hard and soft constraints; Dose volume constraints; Typical user interface for definition of optimization criteria; Biological constraints (Equivalent Uniform Dose); The result of the optimization process; Semi-automatic solutions for IMRT; Generalisation of the optimization problem; Driving and driven variables used in RT optimization; Towards multi-criteria optimization; and Conclusions for the optimization phase. (P.A.)

  8. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Get help with family planning Get help with mental health Find girls' health information Stay Connected Blog Contact us Media inquiries Social media About Us Who we are What we ...

  9. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... It's Only Natural Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing breastfeeding myths Overcoming challenges Finding support Fitting breastfeeding into your life Partner resources Subscribe To receive Breastfeeding email updates ...

  10. Bicycle Safety Action Plan

    Science.gov (United States)

    2012-09-01

    The Arizona Department of Transportation (ADOT) Bicycle Safety Action Plan (BSAP) : identifies improvements, programs, and strategies that, upon their implementation, will : reduce the frequency of bicyclist fatalities and injury crashes that occur o...

  11. SSCL computer planning

    International Nuclear Information System (INIS)

    Price, L.E.

    1990-01-01

    The SSC Laboratory is in the process of planning the acquisition of a substantial computing system to support the design of detectors. Advice has been sought from users and computer experts in several stages. This paper discuss this process

  12. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... your breastfeeding support network How to get your family on board with breastfeeding African-American celebrity moms ... health care Get health insurance Get help with family planning Get help with mental health Find girls' ...

  13. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex

  14. Probabilistic transmission system planning

    CERN Document Server

    Li, Wenyuan

    2011-01-01

    "The book is composed of 12 chapters and three appendices, and can be divided into four parts. The first part includes Chapters 2 to 7, which discuss the concepts, models, methods and data in probabilistic transmission planning. The second part, Chapters 8 to 11, addresses four essential issues in probabilistic transmission planning applications using actual utility systems as examples. Chapter 12, as the third part, focuses on a special issue, i.e. how to deal with uncertainty of data in probabilistic transmission planning. The fourth part consists of three appendices, which provide the basic knowledge in mathematics for probabilistic planning. Please refer to the attached table of contents which is given in a very detailed manner"--

  15. Bridge removal plan requirements.

    Science.gov (United States)

    2011-04-15

    This report provides resources that detail specifications and guidelines related to bridge removal plans across the : United States. We have organized the information into three sections: : ! National Guidance : Includes language from AASHTO specific...

  16. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  17. Breastfeeding: Planning Ahead

    Medline Plus

    Full Text Available ... Planning ahead Breastfeeding and baby basics Making breastfeeding work for you Addressing ... ahead From choosing the crib to finding a pediatrician, you’re probably busy making lots of pre-baby decisions. But if ...

  18. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  19. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  20. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Vogelsang, Stefan; Freudenberg, Peggy

    2015-01-01

    This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data.......This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data....

  1. Globalization and planning education

    OpenAIRE

    H Amirahmadi

    1993-01-01

    The current globalization calls for a globalizing pedagogy of planning education. By 'globalization' is meant a process whereby certain megatrends are made universal to the human condition, although they are differently experienced by diverse cultures and activities and at various territorial scales. A 'globalizing pedagogy', on the other hand, is a mode of education which brings these trends to bear upon the planning profession in such a way as to allow for the advent of common global vision...

  2. Environmental implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  3. Wildland Fire Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Schwager, K. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-09-30

    The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

  4. LCLS Undulator Fiducialization Plan

    International Nuclear Information System (INIS)

    Wolf, Zachary

    2010-01-01

    This note presents the LCLS undulator fiducialization plan. The undulators will be fiducialized in the Magnetic Measurement Facility at SLAC. The note begins by summarizing the requirements for the fiducialization. A brief discussion of the measurement equipment is presented, followed by the methods used to perform the fiducialization and check the results. This is followed by the detailed fiducialization plan in which each step is enumerated. Finally, the measurement results and data storage format are presented.

  5. Factor 4 planning

    International Nuclear Information System (INIS)

    Bariol-Mathais, Brigitte; Lavoillotte, Philippine; Gall-Sorrentino, Florence; Malez, Marianne; Sanna, Daniela; Marsauche, Maud; Marquet, Sarah; Debergue, Sophie; Aminu, Olufunmi; Bernard, Helene; Marchand, Jean-Michel; Blin, Frederic; Grange, Jerome; Caillierez, Sophie; Muller, Dania; Clement, Bob; Desire, Jean-Charles; Metais, Benedicte; Lannuzel, Philippe; Pezet-Kuhn, Murielle; Pons, Anne; Rivoire-Meley, Benedicte; Tissot, Heloise

    2015-07-01

    Factor 4 is the goal of cutting our greenhouse gas emissions by 75% by 2050. Achieving this objective will necessitate radical changes in our practices, in particular concerning transport and housing; the measures currently implemented, such as positive-energy buildings, low-impact mobility and eco-neighbourhoods, will not be enough to meet this goal. These measures must be conceived in the framework of broad territorial planning that integrates environmental and energy objectives far upstream. To this end, the French Environment and Energy Management Agency (ADEME) and the French network of Urban Planning Agencies (FNAU), pursuing their missions in their respective areas of competence, have joined forces to make infrastructure and land use planning an integral part of the environmental and energy transition process. In 2013, the two organisations signed a partnership agreement and compiled an inventory of practices that are relevant to Factor 4 planning. This work was led by Epures, Saint-etienne urban planning agency, along with FNAU, drawing upon the expertise of a dozen urban planning agencies in precursor territories. This inventory describes the stakes, resources and strengths for each territory, which have led to cross-sectoral territorial planning exercises with ambitious environmental and energy objectives; the importance of evaluation in attaining these goals is emphasised. Current experience, questions and available methodological tools are summarised in this document, to encourage territories and help them design their planning policies along a trajectory to achieve Factor 4 goals. The compilation also aims to be a contribution to the COP21 climate conference

  6. Environmental implementation plan

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1994-01-01

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities

  7. International Photovoltaic Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    The International Photovoltaics Program Plan is in direct response to the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (PL 95-590). As stated in the Act, the primary objective of the plan is to accelerate the widespread use of photovoltaic systems in international markets. Benefits which could result from increased international sales by US companies include: stabilization and expansion of the US photovoltaic industry, preparing the industry for supplying future domestic needs; contribution to the economic and social advancement of developing countries; reduced world demand for oil; and improvements in the US balance of trade. The plan outlines programs for photovoltaic demonstrations, systems developments, supplier assistance, information dissemination/purchaser assistance, and an informaion clearinghouse. Each program element includes tactical objectives and summaries of approaches. A program management office will be established to coordinate and manage the program plan. Although the US Department of Energy (DOE) had the lead responsibility for preparing and implementing the plan, numerous federal organizations and agencies (US Departments of Commerce, Justice, State, Treasury; Agency for International Development; ACTION; Export/Import Bank; Federal Trade Commission; Small Business Administration) were involved in the plan's preparation and implementation.

  8. Computerized radiation treatment planning

    International Nuclear Information System (INIS)

    Laarse, R. van der.

    1981-01-01

    Following a general introduction, a chain consisting of three computer programs which has been developed for treatment planning of external beam radiotherapy without manual intervention is described. New score functions used for determination of optimal incidence directions are presented and the calculation of the position of the isocentre for each optimum combination of incidence directions is explained. A description of how a set of applicators, covering fields with dimensions of 4 to 20 cm, for the 6 to 20 MeV electron beams of a MEL SL75-20 linear accelerator was developed, is given. A computer program for three dimensional electron beam treatment planning is presented. A microprocessor based treatment planning system for the Selectron remote controlled afterloading system for intracavitary radiotherapy is described. The main differences in treatment planning procedures for external beam therapy with neutrons instead of photons is discussed. A microprocessor based densitometer for plotting isodensity lines in film dosimetry is described. A computer program for dose planning of brachytherapy is presented. Finally a general discussion about the different aspects of computerized treatment planning as presented in this thesis is given. (Auth.)

  9. Strategic planning for marketers.

    Science.gov (United States)

    Wilson, I

    1978-12-01

    The merits of strategic planning as a marketing tool are discussed in this article which takes the view that although marketers claim to be future-oriented, they focus too little attention on long-term planning and forecasting. Strategic planning, as defined by these authors, usually encompasses periods of between five and twenty-five years and places less emphasis on the past as an absolute predictor of the future. It takes a more probabilistic view of the future than conventional marketing strategy and looks at the corporation as but one component interacting with the total environment. Inputs are examined in terms of environmental, social, political, technological and economic importance. Because of its futuristic orientation, an important tenant of strategic planning is the preparation of several alternative scenarios ranging from most to least likely. By planning for a wide-range of future market conditions, a corporation is more able to be flexible by anticipating the course of future events, and is less likely to become a captive reactor--as the authors believe is now the case. An example of strategic planning at General Elecric is cited.

  10. Paying for family planning.

    Science.gov (United States)

    1998-09-12

    Both houses of the US Congress have passed bills to require that all health plans for federal employees which pay for prescription medications also cover prescription contraceptives approved by the US Food and Drug Administration (USFDA). Of these, the five most commonly prescribed are contraceptive pills, implantable levonorgestrel (Norplant), long-acting injectable medroxyprogesterone acetate (Depo-provera), IUDs, and the diaphragm. Differences between the two bills are now being worked out by a joint House-Senate committee and passage seems almost certain. If a compromise joint bill is passed by both houses, it would cover plans which insure more than 1 million reproductive age women. However, the Equity in Prescription and Contraceptive Coverage (EPICC) Act requiring all US private health plans to cover contraceptive prescriptions is less certain to eventually become legislation. Currently, only 49% of traditional indemnity plans and 39% of health maintenance organizations cover the five most commonly prescribed reversible methods of contraception, while many health plans cover no form of contraception, other than sterilization. The passage of EPICC would expand contraceptive choice for another 45 million US women of childbearing age. Opposition to both bills has come mainly from health insurance and business groups, as well as conservative groups which oppose funding for family planning. Supporters of legislation to expand contraceptive choice for US women should understand that the right to reproductive health and contraceptive services extends beyond US borders, and pressure Congress to bolster US financial support for international population control programs.

  11. Public affairs plan

    International Nuclear Information System (INIS)

    1995-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the fiscal year (FY) 1996 UMTRA Project public affairs program and to identify specific activities to be conducted during the year. It describes the roles of various agencies involved in the public affairs program and defines the functions of the UMTRA Project Technical Assistance Contractor (TAC) Public Affairs Department. It replaces the FY 1995 Public Affairs Plan (DOE/AL/62350-154). The plan also describes the US Department of Energy's (DOE) plans to keep stakeholders and other members of the public informed about UMTRA Project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in UMTRA Project decision-making processes. The plan applies to the UMTRA Project Team; the DOE Grand Junction Projects Office (GJPO); the DOE Albuquerque Operations Office, Office of Public Affairs (OPA); the TAC; the UMTRA Project Remedial Action Contractor (RAC); and other cooperating agencies

  12. Site 300 SPCC Plan

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-11-23

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014).

  13. Single-employer Pension Plans

    Data.gov (United States)

    Pension Benefit Guaranty Corporation — This spreadsheet lists the active single-employer pensions plans insured by PBGC. Plans are identified by name, employer identification number (EIN) and plan number...

  14. Path planning in changeable environments

    NARCIS (Netherlands)

    Nieuwenhuisen, D.

    2007-01-01

    This thesis addresses path planning in changeable environments. In contrast to traditional path planning that deals with static environments, in changeable environments objects are allowed to change their configurations over time. In many cases, path planning algorithms must facilitate quick

  15. Local Authority and Town Planning.

    Science.gov (United States)

    Duder, Bruce

    1987-01-01

    Provides an overview and definition of local authority and town planning in New Zealand. Demonstrates the relevance of planning matters to the teaching of geography. Reviews objectives of geography and specific planning methods used in several districts. (BR)

  16. 2008 Enterprise Transition Plan (ETP)

    National Research Council Canada - National Science Library

    England, Gordon

    2008-01-01

    The Enterprise Transition Plan (ETP) is the Department of Defense's integrated business transformation plan, which incorporates the transition plans of the Military Services, Components and the DoD Enterprise...

  17. Computed tomography in therapy planning: Abdominal region

    International Nuclear Information System (INIS)

    Munzenrider, J.E.

    1983-01-01

    The radiotherapy community is continuing to appreciate the significant contribution CBT can make to planning abdominal radiotherapy and is also beginning to appreciate the pitfalls and limitations of the technique. Specific attention should continue to focus on patient registration with the scanner and simulator radiographs, patient position during scanning and treatment, and effects of involuntary patient motion, especially breathing, on organ and tumor localization. Effects of patient positional changes and of involuntary motion during treatment on treatment planning and execution should be quantitated, as should effects of inhomogeneities, especially gut air, on abdominal dose distribution. Radiotherapy planned with CBT data can impact significantly on morbidity and mortality associated with abdominal malignancies. Faster scanners (with a scanning time of 9 sec or less) should be employed where possible to obtain maximum diagnostic information. Multiplanar reconstruction and true three-dimensional treatment planning can enhance significantly the value of CBT in treatment planning. Radiotherapists, radiodiagnosticians, radiation physicists, and oncologists must be continue to meet the challenge of realizing the true potential of CBT for the benefit of the cancer patients entrusted to their care

  18. Rulison Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-07-01

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile

  19. Variation in Screening Mammography Rates Among Medicare Advantage Plans.

    Science.gov (United States)

    Rosenkrantz, Andrew B; Fleming, Margaret; Duszak, Richard

    2017-08-01

    Prior studies have shown higher screening mammography rates for beneficiaries in capitated managed care Medicare Advantage (MA) plans compared with traditional fee-for-service Medicare. The aim of this study was to explore variation in screening mammography rates at the level of MA managed care plans. Using the 2016 MA Healthcare Effectiveness Data and Information Set Public Use File, screening mammography rates were identified for all 385 reporting MA plans. Associations were explored with a range of plan characteristics from this file, as well as from the CMS Part C and Part D Medicare Star Ratings Data File, Medicare Advantage Plan Directory, and Medicare Monthly Enrollment by Plan File. Overall MA plan screening rates were high (mean, 72.6 ± 9.4%) but varied substantially among plans (range, 14.3%-91.8%). Screening rates were higher in nonprofit versus for-profit plans (77.3% versus 71.8%, P mammography rates vary considerably among MA plans. With increased federal interest in promoting the MA program, enhanced transparency will be necessary to ensure appropriate Medicare beneficiary participation decision making. Copyright © 2017 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  20. Language Planning and Planned Languages: How Can Planned Languages Inform Language Planning?

    Directory of Open Access Journals (Sweden)

    Humphrey Tonkin

    2015-04-01

    Full Text Available The field of language planning (LP has largely ignored planned languages. Of classic descriptions of LP processes, only Tauli (preceded by Wüster suggests that planned languages (what Wüster calls Plansprache might bear on LP theory and practice. If LP aims "to modify the linguistic behaviour of some community for some reason," as Kaplan and Baldauf put it, creating a language de novo is little different. Language policy and planning are increasingly seen as more local and less official, and occasionally more international and cosmopolitan. Zamenhof's work on Esperanto provides extensive material, little studied, documenting the formation of the language and linking it particularly to issues of supranational LP. Defining LP decision-making, Kaplan & Baldauf begin with context and target population. Zamenhof's Esperanto came shortly before Ben-Yehuda's revived Hebrew. His target community was (mostly the world's educated elite; Ben-Yehuda's was worldwide Jewry. Both planners were driven not by linguistic interest but by sociopolitical ideology rooted in reaction to anti-Semitism and imbued with the idea of progress. Their territories had no boundaries, but were not imaginary. Function mattered as much as form (Haugen's terms, status as much as corpus. For Zamenhof, status planning involved emphasis on Esperanto's ownership by its community - a collective planning process embracing all speakers (cf. Hebrew. Corpus planning included a standardized European semantics, lexical selectivity based not simply on standardization but on representation, and the development of written, and literary, style. Esperanto was successful as linguistic system and community language, less as generally accepted lingua franca. Its terminology development and language cultivation offers a model for language revival, but Zamenhof's somewhat limited analysis of language economy left him unprepared to deal with language as power.

  1. Improving IMRT-plan quality with MLC leaf position refinement post plan optimization

    International Nuclear Information System (INIS)

    Niu Ying; Zhang Guowei; Berman, Barry L.; Parke, William C.; Yi Byongyong; Yu, Cedric X.

    2012-01-01

    Purpose: In intensity-modulated radiation therapy (IMRT) planning, reducing the pencil-beam size may lead to a significant improvement in dose conformity, but also increase the time needed for the dose calculation and plan optimization. The authors develop and evaluate a postoptimization refinement (POpR) method, which makes fine adjustments to the multileaf collimator (MLC) leaf positions after plan optimization, enhancing the spatial precision and improving the plan quality without a significant impact on the computational burden. Methods: The authors’ POpR method is implemented using a commercial treatment planning system based on direct aperture optimization. After an IMRT plan is optimized using pencil beams with regular pencil-beam step size, a greedy search is conducted by looping through all of the involved MLC leaves to see if moving the MLC leaf in or out by half of a pencil-beam step size will improve the objective function value. The half-sized pencil beams, which are used for updating dose distribution in the greedy search, are derived from the existing full-sized pencil beams without need for further pencil-beam dose calculations. A benchmark phantom case and a head-and-neck (HN) case are studied for testing the authors’ POpR method. Results: Using a benchmark phantom and a HN case, the authors have verified that their POpR method can be an efficient technique in the IMRT planning process. Effectiveness of POpR is confirmed by noting significant improvements in objective function values. Dosimetric benefits of POpR are comparable to those of using a finer pencil-beam size from the optimization start, but with far less computation and time. Conclusions: The POpR is a feasible and practical method to significantly improve IMRT-plan quality without compromising the planning efficiency.

  2. The Norwegian Plan of Action for nuclear safety issues

    International Nuclear Information System (INIS)

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects

  3. Enhancing Communication in an Egyptian Research Centre

    International Nuclear Information System (INIS)

    Morsy, S.W.

    2013-01-01

    This paper is a proposed attempt to enhance communication in a research centre in Egypt. The currently Nuclear and Radiological Regulatory Authority (NRRA) which formerly was the National Centre for Nuclear Safety and Radiation Control (NCNSRC) is housed in a nine-storey building with a straight double loaded corridor architectural plan. Syntactic axial analysis showed high integration for each floor plan individually which means that the floor plan is not to be blamed for lack of communication among floor inhabitants; other means must be attempted. But global axial integration (for the whole building) proved to be poor. A problem of communication among floors was identified. Means for enhancing communication were introduced: The lecture hall, the cafe and meeting rooms can play an important role in enhancing global communication among NRRA inhabitants. Besides a questionnaire was designed and distributed on all inhabitants and its feedback came up with ideas which if implemented could result in enhancing the level of communication between the inhabitants of the building thus overcoming spatial hindrances.

  4. Site specific plan

    International Nuclear Information System (INIS)

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs

  5. Draft Transportation Institutional Plan

    Energy Technology Data Exchange (ETDEWEB)

    1985-09-01

    The Department of Energy recognizes that the success of its program to develop and implement a national system for nuclear waste management and disposal depends on broad-based public understanding and acceptance. While each program element has its particular sensitivity, the transportation of the waste may potentially affect the greatest number of people, and accordingly is highly visible and potentially issue-laden. Therefore, the Office of Civilian Radioactive Waste Management has developed this Transportation Institutional Plan to lay the foundation for interaction among all interested parties for the purpose of identifying and resolving issues of concern. The Plan is divided into four chapters. Chapter 1 provides bachground information and discusses the purpose of the Plan and the policy guidance for establishing the transportation system. Chapter 2 introduces the major participants who must interact to build both the system itself and the consensus philosophy that is essential for effective operations. Chapter 3 suggests mechanisms for interaction that will ensure wide participation in program planning and implementation. And, finally, Chapter 4 suggests a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. The Plan's appendices provide supporting material to assist the reader in understanding the roles of the involved institutions. 4 figs., 1 tab.

  6. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  7. Public Information Plan

    International Nuclear Information System (INIS)

    1984-06-01

    The Public Information Plan is intended to be used in conjunction with the DOE-UMTRA Project ''Public Participation Plan'' to describe the Department of Energy's plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control of Act of 1978, PL95-604. The Act provides for a cooperative effort with affected states and Indian tribes for the cleanup of designated abandoned or inactive uranium mill tailings sites. The objective of the Public Information Plan of the UMTRA Project is timely and sufficient dissemination of factual information to promote understanding of the project by federal, state, and local officials, the media, special interest groups, and the general public; and thereby to encourage informed participation in the project by the public and government officials. The Uranium Mill Tailings Radiation Control Act provides for public involvement in remedial action planning, with special consideration given to landowners, Indian tribes, and the states. According to the Act, the Secretary of Energy shall hold public hearings in the states where processing sites, vicinity properties, and disposal sites are located. Public participation in the UMTRA Project will not, however, be limited to those mechanisms formally required by law. The public may also be involved informally through informational meetings, workshops, and local citizens' task forces. 12 refs., 2 figs., 1 tab

  8. Draft Transportation Institutional Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Department of Energy recognizes that the success of its program to develop and implement a national system for nuclear waste management and disposal depends on broad-based public understanding and acceptance. While each program element has its particular sensitivity, the transportation of the waste may potentially affect the greatest number of people, and accordingly is highly visible and potentially issue-laden. Therefore, the Office of Civilian Radioactive Waste Management has developed this Transportation Institutional Plan to lay the foundation for interaction among all interested parties for the purpose of identifying and resolving issues of concern. The Plan is divided into four chapters. Chapter 1 provides bachground information and discusses the purpose of the Plan and the policy guidance for establishing the transportation system. Chapter 2 introduces the major participants who must interact to build both the system itself and the consensus philosophy that is essential for effective operations. Chapter 3 suggests mechanisms for interaction that will ensure wide participation in program planning and implementation. And, finally, Chapter 4 suggests a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. The Plan's appendices provide supporting material to assist the reader in understanding the roles of the involved institutions. 4 figs., 1 tab

  9. PLANNING NATIONAL RADIOTHERAPY SERVICES

    Directory of Open Access Journals (Sweden)

    Eduardo eRosenblatt

    2014-11-01

    Full Text Available Countries, states and island nations often need forward planning of their radiotherapy services driven by different motives. Countries without radiotherapy services sponsor patients to receive radiotherapy abroad. They often engage professionals for a feasibility study in order to establish whether it would be more cost-beneficial to establish a radiotherapy facility. Countries where radiotherapy services have developed without any central planning, find themselves in situations where many of the available centres are private and thus inaccessible for a majority of patients with limited resources. Government may decide to plan ahead when a significant exodus of cancer patients travel to another country for treatment, thus exposing the failure of the country to provide this medical service for its citizens. In developed countries the trigger has been the existence of highly visible waiting lists for radiotherapy revealing a shortage of radiotherapy equipment.This paper suggests that there should be a systematic and comprehensive process of long-term planning of radiotherapy services at the national level, taking into account the regulatory infrastructure for radiation protection, planning of centres, equipment, staff, education pr

  10. Piping research program plan

    International Nuclear Information System (INIS)

    1988-09-01

    This document presents the piping research program plan for the Structural and Seismic Engineering Branch and the Materials Engineering Branch of the Division of Engineering, Office of Nuclear Regulatory Research. The plan describes the research to be performed in the areas of piping design criteria, environmentally assisted cracking, pipe fracture, and leak detection and leak rate estimation. The piping research program addresses the regulatory issues regarding piping design and piping integrity facing the NRC today and in the foreseeable future. The plan discusses the regulatory issues and needs for the research, the objectives, key aspects, and schedule for each research project, or group of projects focussing of a specific topic, and, finally, the integration of the research areas into the regulatory process is described. The plan presents a snap-shot of the piping research program as it exists today. However, the program plan will change as the regulatory issues and needs change. Consequently, this document will be revised on a bi-annual basis to reflect the changes in the piping research program. (author)

  11. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ''Partnership in Environmental Excellence'' formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex

  12. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  13. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs

  14. Risk evaluation system for facility safeguards and security planning

    International Nuclear Information System (INIS)

    Udell, C.J.; Carlson, R.L.

    1987-01-01

    The Risk Evaluation System (RES) is an integrated approach to determining safeguards and security effectiveness and risk. RES combines the planning and technical analysis into a format that promotes an orderly development of protection strategies, planing assumptions, facility targets, vulnerability and risk determination, enhancement planning, and implementation. In addition, the RES computer database program enhances the capability of the analyst to perform a risk evaluation of the facility. The computer database is menu driven using data input screens and contains an algorithm for determining the probability of adversary defeat and risk. Also, base case and adjusted risk data records can be maintained and accessed easily

  15. 7 CFR 1210.303 - Plan.

    Science.gov (United States)

    2010-01-01

    ... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE WATERMELON RESEARCH AND PROMOTION PLAN Watermelon Research and Promotion Plan Definitions § 1210.303 Plan. Plan means this watermelon...

  16. Continual improvement plan

    Science.gov (United States)

    1994-01-01

    NASA's approach to continual improvement (CI) is a systems-oriented, agency-wide approach that builds on the past accomplishments of NASA Headquarters and its field installations and helps achieve NASA's vision, mission, and values. The NASA of the future will fully use the principles of continual improvement in every aspect of its operations. This NASA CI plan defines a systematic approach and a model for continual improvement throughout NASA, stressing systems integration and optimization. It demonstrates NASA's constancy of purpose for improvement - a consistent vision of NASA as a worldwide leader in top-quality science, technology, and management practices. The CI plan provides the rationale, structures, methods, and steps, and it defines NASA's short term (1-year) objectives for improvement. The CI plan presents the deployment strategies necessary for cascading the goals and objectives throughout the agency. It also provides guidance on implementing continual improvement with participation from top leadership and all levels of employees.

  17. Energy Organizational Planning

    Energy Technology Data Exchange (ETDEWEB)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty – control and manage their natural resource assets – i.e. develop its own energy resources, meet the current and projected energy needs of their community, and “sit at the table” with other regional energy providers to deal with issues on a peer-to-peer basis.

  18. Energy and urban planning

    DEFF Research Database (Denmark)

    Fertner, Christian

    How can spatial planning reduce energy use in our cities? How do different geographical, regional, cultural or political contexts influence our options? How can we measure and monitor its effects? And where do we set the boundaries for the definition of action and goals? Findings from the interna......How can spatial planning reduce energy use in our cities? How do different geographical, regional, cultural or political contexts influence our options? How can we measure and monitor its effects? And where do we set the boundaries for the definition of action and goals? Findings from...... the international EU-FP7 project PLEEC (‘Planning for energy efficient cities’, 2013-2016) and spin-off projects list options and challenges....

  19. Fractional factorial plans

    CERN Document Server

    Dey, Aloke

    2009-01-01

    A one-stop reference to fractional factorials and related orthogonal arrays.Presenting one of the most dynamic areas of statistical research, this book offers a systematic, rigorous, and up-to-date treatment of fractional factorial designs and related combinatorial mathematics. Leading statisticians Aloke Dey and Rahul Mukerjee consolidate vast amounts of material from the professional literature--expertly weaving fractional replication, orthogonal arrays, and optimality aspects. They develop the basic theory of fractional factorials using the calculus of factorial arrangements, thereby providing a unified approach to the study of fractional factorial plans. An indispensable guide for statisticians in research and industry as well as for graduate students, Fractional Factorial Plans features: * Construction procedures of symmetric and asymmetric orthogonal arrays. * Many up-to-date research results on nonexistence. * A chapter on optimal fractional factorials not based on orthogonal arrays. * Trend-free plans...

  20. Midwest regional management plan

    International Nuclear Information System (INIS)

    Paton, R.F.

    1986-01-01

    In response to the Low-Level Radioactive Waste Policy Act of 1980, the States of Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio and Wisconsin formed the Midwest Interstate Low-Level Radioactive Waste Compact. One of the top priorities of the Compact Commission is the development of a comprehensive regional waste management plan. The plan consists of five major elements: (1) waste inventory; (2) waste stream projections; (3) analysis of waste management and disposal options; (4) development of a regional waste management system; and (5) selection of a host state(s) for future low-level waste facilities. When completed, the Midwest Management Plan will serve as the framework for future low-level radioactive waste management and disposal decisions

  1. Ecological city planning

    Directory of Open Access Journals (Sweden)

    Salvador Rueda

    2013-07-01

    Full Text Available A territory, a city, a neighbourhood are all ecosystems; a mixture of chemico-physical and organic elements related to each other. That which defines an ecological system is the set of rules and characteristics which condition its relationships, and its duration in time is guaranteed by its efficiency and internal organization which applied to the city is translated in the reduction of the use of natural resources and in the increase of social organization. To increase the efficiency of the urban systems is the necessary condition for the formulation of ecological city planning favouring the maximum liveability of sites. Liveability is directly correlated to the optimization of numerous elements (public space, equipment, services, building techniques, innovative technology, social cohesion, biodiversity. To carry out such objectives, ecological city planning proposes a new model of town planning on three levels (subsoil, ground level, and upper level.

  2. Barriers in family planning.

    Science.gov (United States)

    Pendharkar, L P

    1968-01-01

    Because of cultural factors, many people in India are opposed to family planning. They are not able to understand that the real problem facing India is overpopulation. In the past, people were exhorted to have many children, and to look upon numerous offspring as a blessing, and this concept has not changed, although the times and environment have. The majority of marriages in rural areas take place when the girl is hardly 16 or 17, which contributes to high fertility. Also illiteracy breeds ignorance about improved methods of cultivation and about methods of planned parenthood. Starved, poor couples have larger numbers of children than do well-to-do families, and thus poverty becomes a vicious circle. Doctors should come forward and offer their help to family planning programs, and social workers should be less concerned with official routines than results. Educating illiterate, adamant people is no easy task, and requires the zeal of a missionary.

  3. Systems engineering management plans.

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  4. Tourism and Strategic Planning

    DEFF Research Database (Denmark)

    Pasgaard, Jens Christian

    2012-01-01

    The main purpose of this report is to explore and unfold the complexity of the tourism phenomenon in order to qualify the general discussion of tourism-related planning challenges. Throughout the report I aim to demonstrate the strategic potential of tourism in a wider sense and more specifically...... the potential of ‘the extraordinary’ tourism-dominated space. As highlighted in the introduction, this report does not present any systematic analysis of strategic planning processes; neither does it provide any unequivocal conclusions. Rather, the report presents a collection of so-called ‘detours......’ – a collection of theoretical discussions and case studies with the aim to inspire future strategic planning. Due to the complexity and heterogeneity of the phenomenon I use a non-linear and non-chronological report format with the ambition to create a new type of overview. In this regard the report is intended...

  5. Fra Plan til Undervisning

    DEFF Research Database (Denmark)

    Ingerslev, Gitte Holten; Svejgaard, Karin; Madsen, Anne-Grethe

    Fra plan til undervisningspraksis ? en evaluering af fagligt samspil Resumé: Fra plan til undervisning er en rapport fra et evalueringsprojekt finansieret af undervisningsministeriets midler til udviklingsarbejde og forsøg på de gymnasiale uddannelser. Projektet er gennemført af et konsortium...... fremstilles i rapporten Fra plan til Undervisning som tre cases. Casene indeholder en del fællestræk, da skolernes arbejde med fagligt samspil udspringer af en række fælles erfaringer og træk ved undervisningskulturen på htx. Det gælder først og fremmest det forhold, at fagligt samspil knyttes sammen med de...

  6. Educational program emergency planning.

    Science.gov (United States)

    Curtis, Tammy

    2009-01-01

    Tragic university shootings have prompted administrators of higher education institutions to re-evaluate their emergency preparedness plans and take appropriate measures for preventing and responding to emergencies. To review the literature and identify key components needed to prevent shootings at higher education institutions in the United States, and in particular, institutions housing radiologic science programs. Twenty-eight emergency preparedness plans were retrieved electronically and reviewed from a convenience sample of accredited radiologic science programs provided by the Joint Review Committee on Education in Radiologic Technology Web site. The review of the 28 emergency preparedness plans confirmed that most colleges are prepared for basic emergencies, but lack the key components needed to successfully address mass-casualty events. Only 5 (18%) of the 28 institutions addressed policies concerning school shootings.

  7. Fusion safety program plan

    International Nuclear Information System (INIS)

    Crocker, J.G.; Holland, D.F.; Herring, J.S.

    1980-09-01

    The program plan consists of research that has been divided into 13 different areas. These areas focus on the radioactive inventories that are expected in fusion reactors, the energy sources potentially available to release a portion of these inventories, and analysis and design techniques to assess and ensure that the safety risks associated with operation of magnetic fusion facilities are acceptably low. The document presents both long-term program requirements that must be fulfilled as part of the commercialization of fusion power and a five-year plan for each of the 13 different program areas. Also presented is a general discussion of magnetic fusion reactor safety, a method for establishing priorities in the program, and specific priority ratings for each task in the five-year plan

  8. Flood action plans

    International Nuclear Information System (INIS)

    Slopek, R.J.

    1995-01-01

    Safe operating procedures developed by TransAlta Utilities for dealing with flooding, resulting from upstream dam failures or extreme rainfalls, were presented. Several operating curves developed by Monenco AGRA were described, among them the No Overtopping Curve (NOC), the Safe Filling Curve (SFC), the No Spill Curve (NSC) and the Guaranteed Fill Curve (GFC). The concept of an operational comfort zone was developed and defined. A flood action plan for all operating staff was created as a guide in case of a flooding incident. Staging of a flood action plan workshop was described. Dam break scenarios pertinent to the Bow River were developed for subsequent incorporation into a Flood Action Plan Manual. Evaluation of the technical presentations made during workshops were found them to have been effective in providing operating staff with a better understanding of the procedures that they would perform in an emergency. 8 figs

  9. Planning as situated design

    DEFF Research Database (Denmark)

    Axel, Erik

    and situated, too. In this presentation it will be argued that the investigation of systematic planning as conflictual cooperation will help us see that situated activity is not only based on the present conditions, but also relates them to events spread out in time and space, thereby opening up for another......It is common to associate situated activity with concrete, craftlike or manual activity here and now and to reserve theoretical and abstract thinking for activities like theoretical experimentation and systematic planning. Much work has gone into demonstrating that these activities are concrete...... understanding of theoretical thinking. Some material from the empirical research project developed with Klaus Nielsen on the design and engineering of a house will be presented. On this basis a conception of planning will be unfolded. It will be understood differently from the way it is understood...

  10. Recertification Project Plan

    International Nuclear Information System (INIS)

    2001-01-01

    The Waste Isolation Pilot Plant's (WIPP) Recertification Project was established to meet the requirement placed in the WIPP Land Withdrawal Act (LWA) to demonstrate WIPP's continued compliance with the Environmental Protection Agency's (EPA) disposal regulations at five-year intervals. This plan delineates the end goal of the effort, sets out interim goals, and offers up guiding assumptions. In general, it sets the overall direction for a highly complex and interdependent set of tasks leading to recertification of the repository in the spring of 2004. In addition, this plan establishes the institutional roles and responsibilities of WIPP project participants in the recertification effort and lays out a high-level schedule for producing the Compliance Recertification Application (CRA). Detailed plans from each organization supporting this project have been included with this document as attachments. Each participant plan provides significantly more detail with descriptions of activities that are designed to ensure a successful outcome. Woven throughout this plan are the elements of guidance and direction gained from technical exchanges with EPA managers and staff. An important principle on which this plan is built is that the process of recertification will not involve modification to the certification baseline, nor will it involve rule making of any kind. Only changes previously approved by the EPA will be detailed in the CRA. EPA-approved changes to the WIPP certification will be accepted through modification or will be approved through the annual change reporting process. For any compliance areas that have not changed since the submission of the Compliance Certification Application(CCA), these will merely be incorporated in the CRA by reference. The CRA will cover all information since the October 1996 submittal of the CCA. A second major principle on which this plan is built stems from the EPA WIPP Recertification Guidance. That guidance makes it clear that, if

  11. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    Science.gov (United States)

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  12. AIDS and family planning.

    Science.gov (United States)

    1992-01-01

    In 1991, an HIV prevention program advisor and a research/evaluation specialist for family planning programs discussed problems that affected HIV prevention and family planning services in Haiti before and after the coup of the Aristide government. Population activities began aimlessly in 1974 and HIV prevention efforts only began in 1988. After the coup, Haitians lost their newly found hope for meaningful development. All foreign assistance ended and they did not trust the army. In fact, other than essential child survival activities, no health and family planning services operated for several weeks. The situation grew worse after the economic embargo. 3 months after the coup, the US considered adding family planning assistance. Still little movement of condom, family planning, and health supplies left Port-au-Prince for the provinces which adversely affected all health related efforts. Condoms could no longer be distributed easily either in the socially marketed or US supplied condom distribution programs. Before the coup, HIV prevention and family planning programs depended on peer educators to educate the public (this approach made these programs quite successful), but the 2 experts feared that they would not return to those roles and that these programs would need to completely rebuild. Another concern was the large scale urban-rural migration making it difficult for them to continue care. Early in the AIDS epidemic, the Haitian government was on the defensive because the US considered Haitians as a high risk group so it did little to prevent HIV transmission. After 1988, HIV prevention activities in Haiti centered on raising awareness and personalizing the epidemic. The AIDS specialist noted, however, that a major obstacle to increasing knowledge is that AIDS is just 1 of many fatal diseases in Haiti. Moreover few health professionals in Haiti have ever had public health training.

  13. Trajectory Planning of Welding Robot Based on Terminal Priority Planning

    OpenAIRE

    Chi GAO; Minzhou LUO; Fayong GUO; Hui GAO

    2014-01-01

    In order to improve the trajectory planning efficiency and accuracy of multi-joint welding robot, according to the movement feature of multi-joint welding robot, the paper analyzed on existing problems in spatial joint planning of the robot, proposed a terminal priority planning method of robot joint planning, based on the study of energy conservation and accuracy of robot terminal. Using this method, the paper proceeded planning of welding robot joint, stated implementation procedure of join...

  14. OCRWM's evolving strategic planning process and the 1990 plan

    International Nuclear Information System (INIS)

    Sprecher, W.M.; Munro, J.F.; Champagne, D.L.

    1991-01-01

    In 1990, the Secretary of Energy (Secretary Watkins) ordered that all 23 of the Department's major organizations adopt systems of strategic planning. This paper explains the strategic planning process being adopted by one of those organizations, the Office of Civilian Radioactive Waste Management (OCRWM). Secretary Watkins also ordered a much-abbreviated planning cycle for 1990 to produce the first set of plans in September. That first plan for OCRWM is also discussed here

  15. Performance expectation plan

    Energy Technology Data Exchange (ETDEWEB)

    Ray, P.E.

    1998-09-04

    This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.

  16. Marketing Plan: Tukkanuotta Rauma

    OpenAIRE

    Hyrsky, Antti

    2012-01-01

    The purpose of this thesis was to make a marketing plan and a brand new website for a hair saloon. The marketing plan is based on the 7p’s of the extended or service marketing mix. The emphasis is on the parts of promotion and price. The thesis outlines the theory of marketing mix and applies it to the case. The second part of the thesis is a new website. The website was done using Joomla! 1.7 content management system. This platform was selected in order to make future updating and m...

  17. The Dairy - Business Plan

    OpenAIRE

    Wilson, Natalie

    2013-01-01

    The Bachelor thesis in question has been composed to help the founders of a small start-up company, in the holiday rental industry, succeed in running a sustainable business. The purpose was to create a practical plan for setting up and running the Dairy, a two-bedroom holiday rental in the rural Devon countryside. The business plan discussed the location and facilities of the holiday rental along with a comprehensive account of its competitors. The Dairy’s marketing activity and risk asses...

  18. Environmental protection implementation plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1998-03-01

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable

  19. Aspects of Inspection Planning

    DEFF Research Database (Denmark)

    Faber, M. H.; Sørensen, John Dalsgaard

    2000-01-01

    Inspection planning for systems is considered with special emphasis to the effect of the quality of inspections on the system reliability and the probability of repair. Inspection quality is described and discussed in terms of inspection reliability and inspection coverage where the latter is set...... in relation to the correlation between the failure modes of the considered system. The inspection planning problem is described in general terms taking basis in the Bayesian decision theory. Practical applicable approaches are derived from the more general but also more involving formulations. The theoretical...

  20. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  1. Federal Radionavigation Plan

    Science.gov (United States)

    1986-12-01

    develops national plans towards providing an optimum mix of radionavigation systems for ’he foreseeable Future. ( . 7 <ey nords !8 DYs- outon Staterent ...sector are invited to submit their inputs to the Chairman of the DOT Navigation Working Group (Attn: DMA-26), Department of Transportation, Research ...3.2.7 Aeronautical and Marine Radiobeacons 3-29 3.3 Developing Systems-Status and Plans 3-33 3.3.1 MLS 3-33 3.3.2 GPS 3-35 4. RADIONAVIGATION RESEARCH

  2. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2015-01-01

    This paper investigates sales and operations planning (S&OP) at four Scandinavian industrial food producers in order to explore how the use of S&OP might help leaders to deal with the challenges set by the planning environment. Variables connected to the product and market, e.g., frequency of new...... product development, customer service levels, and supply uncertainty, were identified as particularly critical for the S&OP process. It was found that there is great potential for S&OP in the food industry, foremost to cope with the imbalances between demand and supply and to create prerequisites...

  3. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2013-01-01

    This paper explores how the use of sales and operations planning (S&OP) may deal with the challenges set by the planning environment by investigating S&OP at four Scandinavian industrial food producers. Variables connected to the product and market, e.g. perishability, customer service elements...... and supply uncertainty were identified as particularly critical for the S&OP process. It was found that there is a great potential for S&OP in the food industry, foremost to cope with the imbalances between demand and supply and to create prerequisites for a stable production process....

  4. Planning for the Pandemic

    OpenAIRE

    2006-01-01

    Over the past year, many of us have become involved in the development of strategic plans for the hospitals, health authorities and clinical practices in which we work in case an influenza pandemic occurs in the very near future. Planning for this on the front lines is difficult, due in large part to the uncertainties involved. How will the pandemic evolve? Is the current H5N1 strain of bird flu going to be 'the' one? How closely will the pandemic resemble that of 1918? Will it have the same...

  5. Manufacturing Planning Guide

    Science.gov (United States)

    Waid, Michael

    2011-01-01

    Manufacturing process, milestones and inputs are unknowns to first-time users of the manufacturing facilities. The Manufacturing Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their project engineering personnel in manufacturing planning and execution. Material covered includes a roadmap of the manufacturing process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, products, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  6. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Sørensen, Nils Lykke

    2016-01-01

    This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period.......This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period....

  7. Corporate plan 1989

    International Nuclear Information System (INIS)

    1988-12-01

    The paper presents the United Kingdom Science and Engineering Research Council's second Corporate Plan 1989. The Corporate Plan comprises statements of the current objectives of the Astronomy and Planetary Science Board, the Engineering Board, the Nuclear Physics Board, the Atmospheric Sciences and Computing Centre, along with a discussion of the mechanisms for their attainment. The Annex contains a description of some scientific highlights between 1985-1989, as well as a review of progress between 1984-5 to 1987-8. (U.K.)

  8. Limerick Clare Energy Plan

    DEFF Research Database (Denmark)

    Connolly, David; Mathiesen, Brian Vad; Dubuisson, Xavier

    2012-01-01

    at a national level, but they need to be supplemented by local plans also, since the most successful renewable energy projects to date are at a local level. For example, it is evident from the transition to renewable energy in Denmark, that 100% renewable energy systems can already be implemented at a local...... level. Hence, by initiating local action, national targets can be met and exceeded, while also creating a template for a wider transition to renewable energy. Accordingly, the primary goal of the project is: To develop a local energy plan for Limerick and Clare which is based on a quantified assessment...

  9. Guam Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.

    2013-07-01

    Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

  10. Overview about project planning

    Directory of Open Access Journals (Sweden)

    Catalin Drob

    2012-12-01

    Full Text Available The purpose of this article is to present the main aspects regarding project planning. This study is generally based on the fourth edition of the Guide to the Project Management Body of Knowledge (PMBOK Guide developed by the Project Management Institute (PMI in 2008. According to this edition of PMBOK, project planning involves a group of processes required to establish the scope of the project, refine the objectives, and define the actions that must be undertaken to attain the objectives of the project.

  11. Strategic planning effectiveness comparative analysis of the Macedonian context

    Directory of Open Access Journals (Sweden)

    Bobek Šuklev

    2012-01-01

    useful knowledge conclusions. The originality and the value of the study for the literature and theoretical knowledge lies in the attempt for the strategic planning effectiveness to be investigated for first time on the ground of many emerging and developing counties from the regions of Eastern, Central and especially South-Eastern Europe, as well as for a comparative analysis to be conducted with several non-European emerging and developing counties, with useful conclusions about the strategic planning and its relationship with organizational effectiveness Practical implications refer to setting up the different dimensions of the strategic planning practice in a way that will enhance the strategic planning effectiveness and give useful suggestions to managers by focusing their efforts on the effective strategic planning practice. Considering that this study has been conducted in the Republic of Macedonia and that the strategic planning practice can be subject to some contingencies i.e. some cultural and institutional environment influences, much can be done in future research in this direction.

  12. Mathematical models for planning support

    NARCIS (Netherlands)

    L.G. Kroon (Leo); R.A. Zuidwijk (Rob)

    2003-01-01

    textabstractIn this paper we describe how computer systems can provide planners with active planning support, when these planners are carrying out their daily planning activities. This means that computer systems actively participate in the planning process by automatically generating plans or

  13. Northwest Forest Plan research synthesis.

    Science.gov (United States)

    Richard W. Haynes; Gloria E. Perez; [tech. eds.].

    2000-01-01

    This document synthesizes research accomplishments initiated and funded under the Northwest Forest Plan or the President’s Forest Plan (hereafter referred to as the Forest Plan) since its inception in 1994. Three major parts in this document cover, the context for this effort, eight Forest Plan research accomplishments, and a synthesis. The eight accomplishments...

  14. NATO Defence Planning Process. Implications for defence posture

    Directory of Open Access Journals (Sweden)

    Paweł Fleischer

    2015-12-01

    Full Text Available The NATO Defence Planning Process (NDPP is the most important element affecting the Alliance's defence posture. Under the process states commit themselves to provide capabilities and forces required to fulfil NATO missions, defined in the NATO Strategic Concept. The NDPP directly affects national defence plans by harmonizing them with identified security and defence objectives as well by influencing development of the novel national defence capabilities. The emergence of new threats in the NATO environment, demands modifications in the defense planning process and establishing new goals for the Alliance. Enhancement of the NDPP should be priority during the time of unrest.

  15. Succession planning in hospitals and the association with organizational performance.

    Science.gov (United States)

    Kim, Tae Hyun

    2012-01-01

    Effective succession planning is the heart of leadership development and an essential business strategy because it enhances the ability to achieve orderly transitions and maintain productivity levels. The results of this study are consistent with previous studies that exhibit a positive association of previous years' performance with internal succession planning. The key to successful succession planning lies in building a solid foundation of profitability. Having successors ready to fill key vacancies helps improve operational condition and the bottom line, and thus, gives a competitive edge in the market. Preparing successors for leadership may determine which organizations simply survive and which thrive and lead their markets down the road.

  16. BC Hydro's business plan: a summary of BC Hydro's strategic business plan and performance measures

    International Nuclear Information System (INIS)

    2000-04-01

    This document contains a summary of BC Hydro's Strategic Plan and performance measures. The plan has been prepared in response to the recommendations of the Budget Process Review Panel, convened by the BC Government, which recommended that each public body, crown corporation, and other agencies of government, prepare an annual three year business plan. The document reviews the utility's current situation, provides an outline of the company's vision of its role, its mission and values, its strategic objectives (effective governance, efficiency and productivity; service excellence and value-added solutions; market development ; strong and capable organization) and the tools to be utilized in measuring performance. Various strategic issues (financial resources, the need to protect and enhance the value of electricity trading; the impact of information technology; power technology development; environmental trends and 'green energy' initiatives; workforce training and development) are also highlighted

  17. Trust and Estate Planning

    DEFF Research Database (Denmark)

    Harrington, Brooke

    2012-01-01

    , these professionals keep a significant portion of the world’s private wealth beyond the reach of the state. Trust and estate planning thus contributes to creating and maintaining socioeconomic inequality on a global scale. The significance of the profession has grown as wealth itself has become more fungible...

  18. PNNL Campus Master Plan

    Energy Technology Data Exchange (ETDEWEB)

    Mosey, Whitney LC

    2012-09-07

    The Plan is used as a guide for PNNL in making facility and infrastructure decisions essential to supporting the PNNL vision: to establish a modern, collaborative, flexible, and sustainable campus while optimizing the efficiency of operations in support of courageous discovery and innovation.

  19. Great Expectations. [Lesson Plan].

    Science.gov (United States)

    Devine, Kelley

    Based on Charles Dickens' novel "Great Expectations," this lesson plan presents activities designed to help students understand the differences between totalitarianism and democracy; and a that a writer of a story considers theme, plot, characters, setting, and point of view. The main activity of the lesson involves students working in groups to…

  20. A Planning Palimpsest

    DEFF Research Database (Denmark)

    Carter, Helen Frances Lindsay; Gutzon Larsen, Henrik; Olesen, Kristian

    2015-01-01

    In this article, we analyse the evolution and transformation of Danish spatial planning from its tentative origins in liberalist politics, through its rise as a central feature of the welfare state project, to its more recent entrepreneurial forms in a context of neoliberalisation. The article...

  1. Interactive Environmental Planning

    DEFF Research Database (Denmark)

    Freudendal-Pedersen, Malene; Hartmann-Petersen, Katrine; Kjærulff, Aslak Aamot

    2017-01-01

    This article presents a research project on mobility management in Danish municipalities aimed at creating more sustainable mobilities. The project, called Formula M (2011–2014), worked within sciences, public and private sectors, and civil society. Often contemporary projects in both planning an...

  2. Power of a Plan.

    Science.gov (United States)

    Mineo, Ronald W.; Stehn, John L.

    1998-01-01

    Discusses the effects of electric power deregulation on an educational facility's planning and purchasing for future power needs. Highlights ways schools can take advantage of deregulation. Examines various chiller technologies and economically assessing these technologies on a life-cycle cost basis. (GR)

  3. Planning Your Own Funeral

    Science.gov (United States)

    ... High-Speed Internet Service Shopping for Used Mattresses Solar Power for Your Home The FTC Funeral Rule The Language of Recycling Travel Tips Types of Funerals Using Layaway Plans Warranties You Are Here Bookmark Buying & Owning a Car Credit & Loans Dealing with Debt Resolving Consumer Problems ...

  4. War Literature. [Lesson Plan].

    Science.gov (United States)

    Soderquist, Alisa

    Based on Stephen Crane's poems about war and his novel "The Red Badge of Courage," this lesson plan presents activities designed to help students understand that Crane examined war-related themes in prose and poetry; that close study of a poem for oral presentation helps readers see meaning or techniques not noted earlier; and that not all readers…

  5. TVET Planning and Development

    NARCIS (Netherlands)

    Dr. J. Onstenk

    2014-01-01

    There are changes in society and labour market demands made to TVET and in the TVET system itself. To deal with both types of challenges, the aim for TVET planning and development is to anticipate how employment will evolve and to determine how to give individuals a knowledge base that will enable

  6. 1992 Electricity plan

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    A summary is provided of British Columbia Hydro's 1992 electricity plan. The plan reflects the evolution of BC Hydro's planning strategy to accomodate: an increasing number of resource options, including demand-side management; shorter lead times for some alternatives; smaller plant sizes; greater diversification of electrical services; continued reliance on the private sector; greater focus on customer requirements; environmental externalities and socio-economic costs and benefits; and continued consultation with the public and First Nations peoples. Gains continue to be made on the supply outlook, through operating efficiencies, innovative demand reduction measures, marketing practices, and promotion of private sector resource development. Highlights of the events since the March 1991 plan update include: connection of Fort Nelson to the Alberta Power System; halting of Alcan's Kemano project for a federal environmental review, subsequent overturning of the ruling, and the decision by the provincial government to conduct an economic and environmental review; ammendments to the interconnection and exchange agreement with Bonneville Power Administration; and an agreement for coordination between the Alberta interconnected system and BC Hydro. 5 figs., 2 tabs.

  7. Corporate family planning.

    Science.gov (United States)

    Kakizaki, J

    1991-03-01

    A forward-looking long-term policy of employment-based family planning and employee health has paid off in lower birth rates, better health indicators as well as significant savings in insurance and medical benefits expenses for Nippon Express Co., Ltd., Japan. Nippon Express is now an international corporation with 48,00 employees. "Nittsu" as it is known, began a family planning program in 1956 by hiring qualified professional family planning nurses and midwives, producing its own educational materials and selling contraceptives at reduced rates. The family planning program was expanded to the extent that it has its own Managing Council with Local Councils run democratically, users employees and their spouses as volunteers with group guidance, and provides services at community health centers in rural areas. Now there are 63,000 households covered, activities encompass recreation and home economics, and the health focus has broadened to family health and to include risk factors for disease of middle age. The program has reduced the birth rate of employees from 19.5% to 8.2%, and the abortion rate to 1/10 the initial level, cut the dependency rate of the work force 50%, lowered absenteeism by 2/3, accidents to 1/10, and improved employee loyalty and morale.

  8. RPII Action Plan

    International Nuclear Information System (INIS)

    2011-03-01

    This document outlines RPII's committments under the Public Service Action Plan 2010 to 2014, otherwise known as the Croke Park Agreement. The document describes the proposed changes to the workplan, the benefits arising from the changes and the timeframe for implementing the committments

  9. 5. Natural Family Planning

    African Journals Online (AJOL)

    Sitwala

    need to intensify Health Education in this area. KEY WORDS: Abstinence, Couple, Determinants,. Family Planning (FP) ... the potential benefits of FP, it is important to any community when the births of children are spread. .... education 16.3% (67) and College level 4.9% (20) .8.3% (34) had no education at all (table 4). The.

  10. Plan for Plants

    Science.gov (United States)

    Babic, Mary Jean

    2012-01-01

    Sure, it would be nice to start a school garden, but there will be plenty of time to do it in the spring. Think again. If one's goal this year is to start a class garden, it's already time to start planning! In this article, the author shows just how (and when) to do each step with a full-year calendar.

  11. IAEA Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    Geist, William H. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-15

    The objectives for this presentation are to describe the method that the IAEA uses to determine a sampling plan for nuclear material measurements; describe the terms detection probability and significant quantity; list the three nuclear materials measurement types; describe the sampling method applied to an item facility; and describe multiple method sampling.

  12. Magnetic Fusion Program Plan

    International Nuclear Information System (INIS)

    1985-02-01

    This Plan reflects the present conditions of the energy situation and is consistent with national priorities for the support of basic and applied research. It is realistic in taking advantage of the technical position that the United States has already established in fusion research to make cost-effective progress toward the development of fusion power as a future energy option

  13. Planning with Reachable Distances

    KAUST Repository

    Tang, Xinyu

    2009-01-01

    Motion planning for spatially constrained robots is difficult due to additional constraints placed on the robot, such as closure constraints for closed chains or requirements on end effector placement for articulated linkages. It is usually computationally too expensive to apply sampling-based planners to these problems since it is difficult to generate valid configurations. We overcome this challenge by redefining the robot\\'s degrees of freedom and constraints into a new set of parameters, called reachable distance space (RD-space), in which all configurations lie in the set of constraint-satisfying subspaces. This enables us to directly sample the constrained subspaces with complexity linear in the robot\\'s number of degrees of freedom. In addition to supporting efficient sampling, we show that the RD-space formulation naturally supports planning, and in particular, we design a local planner suitable for use by sampling-based planners. We demonstrate the effectiveness and efficiency of our approach for several systems including closed chain planning with multiple loops, restricted end effector sampling, and on-line planning for drawing/sculpting. We can sample single-loop closed chain systems with 1000 links in time comparable to open chain sampling, and we can generate samples for 1000-link multi-loop systems of varying topology in less than a second. © 2009 Springer-Verlag.

  14. School Planning Safe Transporting.

    Science.gov (United States)

    New Jersey State Dept. of Education, Trenton. Bureau of Pupil Transportation.

    Prepared for boards of education and municipal planning authorities, school site selection is related to school bus safety. Consideration of direction and density of traffic flow, street crossings, curbing, drainage, road width, parking areas, number of pupils and personnel, number of buses, method of transportation, schedules and extra-curricular…

  15. Environmental Education Strategic Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    This document is designed to guide the Environmental Education and Development Branch (EM-522) of the EM Office of Technology (OTD) Development, Technology Integration and Environmental Education Division (EM-52) in planning and executing its program through EM staff, Operations Offices, National Laboratories, contractors, and others.

  16. Recycling Lesson Plans.

    Science.gov (United States)

    Pennsylvania State Dept. of Environmental Resources, Harrisburg.

    This document contains lesson plans about recycling for teachers in grades K-12. Titles include: (1) "Waste--Where Does It Come From? Where Does It Go?" (2) "Litter Detectives," (3) "Classroom Paper Recycling," (4) "Recycling Survey," (5) "Disposal and Recycling Costs," (6) "Composting…

  17. Artificial Gravity Research Plan

    Science.gov (United States)

    Gilbert, Charlene

    2014-01-01

    This document describes the forward working plan to identify what countermeasure resources are needed for a vehicle with an artificial gravity module (intermittent centrifugation) and what Countermeasure Resources are needed for a rotating transit vehicle (continuous centrifugation) to minimize the effects of microgravity to Mars Exploration crewmembers.

  18. Comprehensive facilities plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

  19. Construction Management: Planning Ahead.

    Science.gov (United States)

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  20. Paradoxes in planning

    NARCIS (Netherlands)

    van Wezel, W.M.C.; Jorna, R.J.J.M.

    The word 'planner' has two distinct meanings in literature. The first meaning refers to the profession of a human. Organizational processes must be planned so people know what work they are going to do. An example is a production planner in a factory. The second meaning of planner refers to an actor