WorldWideScience

Sample records for enhancement program managers

  1. Enhancing materials management programs in nuclear power plants

    International Nuclear Information System (INIS)

    Hassaballa, M.M.; Malak, S.M.

    1992-01-01

    Materials management programs for the nuclear utilities in the United States are continually being affected, concurrent with the gradual disappearance of qualified component and replacement parts vendors by regulatory concerns about procurement and materials management. In addition, current economic and competitive pressures are forcing utilities to seek avenues for reducing procurement costs for safety-related items. In response to these concerns, initiatives have been undertaken and engineering guidelines have been developed by the nuclear power industry-sponsored organizations, such as the Electric Power Research Institute and the Nuclear Management Resources Council. It is our experience that successful materials management programs require a multitude of engineering disciplines and experience and are composed of three major elements: strategic procurement plan, parts classification and procurement data base, and enhancement tools. This paper provides a brief description of each of the three elements

  2. Enhancing knowledge and attitudes in pain management: a pain management education program for nursing home staff.

    Science.gov (United States)

    Tse, Mimi Mun Yee; Ho, Suki S K

    2014-03-01

    The aim of the study was to examine the effectiveness of a pain management program (PMP) in enhancing the knowledge and attitudes of health care workers in pain management. Many nursing home residents suffer from pain, and treatment of pain is often inadequate. Failure of health care workers to assess pain and their insufficient knowledge of pain management are barriers to adequate treatment. It was a quasiexperimental pretest and posttest study. Four nursing homes were approached, and 88 staff joined the 8-week PMP. Demographics and the knowledge and attitudes regarding pain were collected with the use of the Nurse's Knowledge and Attitudes Survey Regarding Pain-Chinese version (NKASRP-C) before and after the PMP. A deficit in knowledge and attitudes related to pain management was prominent before the PMP, and there was a significant increase in pain knowledge and attitudes from 7.9 ± SD 3.52 to 19.2 ± SD4.4 (p nursing staff and enable them to provide adequate and appropriate care to older persons in pain. PMPs for nurses and all health care professionals are important in enhancing care for older adults and to inform policy on the provision of pain management. Copyright © 2014 American Society for Pain Management Nursing. Published by Elsevier Inc. All rights reserved.

  3. 34 CFR 611.2 - What management plan must be included in a Teacher Quality Enhancement Grants Program application?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What management plan must be included in a Teacher... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... appropriate, a management plan that includes a proposed multiyear workplan. (b) At a minimum, this workplan...

  4. Managing a Behavioral Management Program

    DEFF Research Database (Denmark)

    Schapiro, Steve; Lambeth, Susan P.

    2017-01-01

    The behavioral management of captive nonhuman primates (NHPs) can be significantly enhanced through synergistic relationships with noninvasive research projects. Many behavioral and cognitive research procedures are challenging and enriching (physically, cognitively, and/or socially......) for the animals (Hopper et al. 2016; Hopkins and Latzman 2017) without involving any invasive (surgical, biopsy, etc.) procedures. Noninvasive behavioral research programs present the primates with opportunities to choose to voluntarily participate (or not), providing them with greater control over...

  5. Program Management Tool

    Science.gov (United States)

    Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil

    2007-01-01

    The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity

  6. Asset management program enhancement plan : baseline assessment phases I and II.

    Science.gov (United States)

    2015-09-01

    This project resulted in the development of a framework for making asset management decisions on low-volume bridges. The : research focused on low-volume bridges located in the agricultural counties of Iowa because recent research has shown that thes...

  7. Teaching Folder Management System for the Enhancement of Engineering and Built Environment Faculty Program

    Science.gov (United States)

    Ab-Rahman, Mohammad Syuhaimi; Mustaffa, Muhamad Azrin Mohd; Abdul, Nasrul Amir; Yusoff, Abdul Rahman Mohd; Hipni, Afiq

    2015-01-01

    A strong, systematic and well-executed management system will be able to minimize and coordinate workload. A number of committees need to be developed, which are joined by the department staffs to achieve the objectives that have been set. Another important aspect is the monitoring department in order to ensure that the work done is correct and in…

  8. Counterterrorism: DOD Should Enhance Management of and Reporting on Its Global Train and Equip Program

    Science.gov (United States)

    2016-04-01

    this work may contain copyrighted images or other material , permission from the copyright holder may be necessary if you wish to reproduce this... material separately. Page 1 GAO-16-368 Counterterrorism 441 G St. N.W. Washington, DC 20548 April 18, 2016 Congressional Committees...The fiscal year 2015 National Defense Authorization Act (NDAA) included a provision for GAO to conduct biennial audits of programs conducted pursuant

  9. Tribal Waste Management Program

    Science.gov (United States)

    The EPA’s Tribal Waste Management Program encourages environmentally sound waste management practices that promote resource conservation through recycling, recovery, reduction, clean up, and elimination of waste.

  10. Enhanced oil recovery program review

    International Nuclear Information System (INIS)

    1994-05-01

    Canada accounts for 40% of the global resources in heavy oils and oil sands bitumen, however, more than 90% of these resources need new and innovative technologies if they are to be made available at a competitive price. CANMET's Enhanced Oil Recovery (EOR) program was created in the late 1970s in response to the drive for energy self-sufficiency. Funding of the project is highly leveraged; industry funding towards projects supported under the CANMET Energy Conversion Program averaged over 300% annually since the previous review in 1990. Multi-client EOR technology projects include horizontal well technology, development of the vapour extraction process, and field testing of oil sands extraction technology. Direction and priorities of the program are established in consultation with the Minister's Advisory Council to CANMET (MNACC), industry and other performers and sponsors of enhanced oil recovery R and D. This review, including client feedback from interviews with several industry spokespersons, concluded that the program was well managed, and of high priority. Various options capable of meeting future needs were examined. Continuation of the current program, incorporating a number of significant changes, was recommended

  11. Internet-based virtual classroom and educational management software enhance students' didactic and clinical experiences in perfusion education programs.

    Science.gov (United States)

    Riley, Jeffrey B; Austin, Jon W; Holt, David W; Searles, Bruce E; Darling, Edward M

    2004-09-01

    A challenge faced by many university-based perfusion education (PE) programs is the need for student clinical rotations at hospital locations that are geographically disparate from the main educational campus. The problem has been addressed through the employment of distance-learning environments. The purpose of this educational study is to evaluate the effectiveness of this teaching model as it is applied to PE. Web-based virtual classroom (VC) environments and educational management system (EMS) software were implemented independently and as adjuncts to live, interactive Internet-based audio/video transmission from classroom to classroom in multiple university-based PE programs. These Internet environments have been used in a variety of ways including: 1) forum for communication between the university faculty, students, and preceptors at clinical sites, 2) didactic lectures from expert clinicians to students assigned to distant clinical sites, 3) small group problem-based-learning modules designed to enhance students analytical skills, and 4) conversion of traditional face-to-face lectures to asynchronous learning modules. Hypotheses and measures of student and faculty satisfaction, clinical experience, and learning outcomes are proposed, and some early student feedback was collected. For curricula that emphasize both didactic and clinical education, the use of Internet-based VC and EMS software provides significant advancements over traditional models. Recognized advantages include: 1) improved communications between the college faculty and the students and clinical preceptors, 2) enhanced access to a national network of clinical experts in specialized techniques, 3) expanded opportunity for student distant clinical rotations with continued didactic course work, and 4) improved continuity and consistency of clinical experiences between students through implementation of asynchronous learning modules. Students recognize the learning efficiency of on

  12. Integrated Financial Management Program

    Science.gov (United States)

    Pho, Susan

    2004-01-01

    Having worked in the Employees and Commercial Payments Branch of the Financial Management Division for the past 3 summers, I have seen the many changes that have occurred within the NASA organization. As I return each summer, I find that new programs and systems have been adapted to better serve the needs of the Center and of the Agency. The NASA Agency has transformed itself the past couple years with the implementation of the Integrated Financial Management Program (IFMP). IFMP is designed to allow the Agency to improve its management of its Financial, Physical, and Human Resources through the use of multiple enterprise module applications. With my mentor, Joseph Kan, being the branch chief of the Employees and Commercial Payments Branch, I have been exposed to several modules, such as Travel Manager, WebTads, and Core Financial/SAP, which were implemented in the last couple of years under the IFMP. The implementation of these agency-wide systems has sometimes proven to be troublesome. Prior to IFMP, each NASA Center utilizes their own systems for Payroll, Travel, Accounts Payable, etc. But with the implementation of the Integrated Financial Management Program, all the "legacy" systems had to be eliminated. As a result, a great deal of enhancement and preparation work is necessary to ease the transformation from the old systems to the new. All this work occurs simultaneously; for example, e-Payroll will "go live" in several months, but a system like Travel Manager will need to have information upgraded within the system to meet the requirements set by Headquarters. My assignments this summer have given me the opportunity to become involved with such work. So far, I have been given the opportunity to participate in projects resulting from a congressional request, several bankcard reconciliations, updating routing lists for Travel Manager, updating the majordomo list for Travel Manager approvers and point of contacts, and a NASA Headquarters project involving

  13. Construction program management

    CERN Document Server

    Delaney, Joseph

    2013-01-01

    Although construction is one of the largest industries in the United States, it lags behind other industries in its implementation of modern management techniques such as those contained in the Standard for Program Management (the Standard) by the Project Management Institute (PMI(R)). Construction Program Management details the successful use of the PMI(R) approach for the construction of capital programs. It demonstrates, through case studies, how implementation of PMI's set of tools and techniques can improve the chances of program success. Exploring tactical and strategic management method

  14. The Skills Enhancement Training Program. Performance Report.

    Science.gov (United States)

    Food and Beverage Workers Union, Local 32, Washington, DC.

    This report describes a joint labor-management workplace literacy program called SET (Skills Enhancement Training) that targeted the more than 2,000 unionized employees of food service contractors at U.S. government institutions in Washington, D.C. Nineteen classes were offered and a total of 191 people self-selected themselves into the program.…

  15. French plutonium management program

    International Nuclear Information System (INIS)

    Greneche, D.

    2002-01-01

    The French plutonium management program is summarized in this paper. The program considers nuclear generation as a major component of national electric power supply and includes the reprocessing of the spent fuel. (author)

  16. Unstable slope management program.

    Science.gov (United States)

    2009-08-01

    This Rapid Response Project gathered information on existing unstable slope management programs, with a : focus on asset management practices in the United States and overseas. On the basis of this study, the research : team summarized and recommende...

  17. Program Management System manual

    International Nuclear Information System (INIS)

    1986-01-01

    The Program Management System (PMS), as detailed in this manual, consists of all the plans, policies, procedure, systems, and processes that, taken together, serve as a mechanism for managing the various subprograms and program elements in a cohesive, cost-effective manner. The PMS is consistent with the requirements of the Nuclear Waste Policy Act of 1982 and the ''Mission Plan for the Civilian Radioactive Waste Management Program'' (DOE/RW-0005). It is based on, but goes beyond, the Department of Energy (DOE) management policies and procedures applicable to all DOE programs by adapting these directives to the specific needs of the Civilian Radioactive Waste Management program. This PMS Manual describes the hierarchy of plans required to develop and maintain the cost, schedule, and technical baselines at the various organizational levels of the Civilian Radioactive Waste Management Program. It also establishes the management policies and procedures used in the implementation of the Program. These include requirements for internal reports, data, and other information; systems engineering management; regulatory compliance; safety; quality assurance; and institutional affairs. Although expanded versions of many of these plans, policies, and procedures are found in separate documents, they are an integral part of this manual. The PMS provides the basis for the effective management that is needed to ensure that the Civilian Radioactive Waste Management Program fulfills the mandate of the Nuclear Waste Policy Act of 1982. 5 figs., 2 tabs

  18. Enhancing the effectiveness of biological control programs of invasive species through a more comprehensive pest management approach.

    Science.gov (United States)

    DiTomaso, Joseph M; Van Steenwyk, Robert A; Nowierski, Robert M; Vollmer, Jennifer L; Lane, Eric; Chilton, Earl; Burch, Patrick L; Cowan, Phil E; Zimmerman, Kenneth; Dionigi, Christopher P

    2017-01-01

    Invasive species are one of the greatest economic and ecological threats to agriculture and natural areas in the US and the world. Among the available management tools, biological control provides one of the most economical and long-term effective strategies for managing widespread and damaging invasive species populations of nearly all taxa. However, integrating biological control programs in a more complete integrated pest management approach that utilizes increased information and communication, post-release monitoring, adaptive management practices, long-term stewardship strategies, and new and innovative ecological and genetic technologies can greatly improve the effectiveness of biological control. In addition, expanding partnerships among relevant national, regional, and local agencies, as well as academic scientists and land managers, offers far greater opportunities for long-term success in the suppression of established invasive species. In this paper we direct our recommendations to federal agencies that oversee, fund, conduct research, and develop classical biological control programs for invasive species. By incorporating these recommendations into adaptive management strategies, private and public land managers will have far greater opportunities for long-term success in suppression of established invasive species. © 2016 Society of Chemical Industry. © 2016 Society of Chemical Industry.

  19. Program management system manual

    International Nuclear Information System (INIS)

    1989-08-01

    OCRWM has developed a program management system (PMS) to assist in organizing, planning, directing and controlling the Civilian Radioactive Waste Management Program. A well defined management system is necessary because: (1) the Program is a complex technical undertaking with a large number of participants, (2) the disposal and storage facilities to be developed by the Program must be licensed by the Nuclear Regulatory Commission (NRC) and hence are subject to rigorous quality assurance (QA) requirements, (3) the legislation mandating the Program creates a dichotomy between demanding schedules of performance and a requirement for close and continuous consultation and cooperation with external entities, (4) the various elements of the Program must be managed as parts of an integrated waste management system, (5) the Program has an estimated total system life cycle cost of over $30 billion, and (6) the Program has a unique fiduciary responsibility to the owners and generators of the nuclear waste for controlling costs and minimizing the user fees paid into the Nuclear Waste Fund. This PMS Manual is designed and structured to facilitate strong, effective Program management by providing policies and requirements for organizing, planning, directing and controlling the major Program functions

  20. Communicating Risk to Program Managers

    Science.gov (United States)

    Shivers, C. Herbert

    2005-01-01

    Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

  1. Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Coobs, J.H.

    1983-01-01

    This is the second of two programs that are concerned with the management of surplus facilities. The facilities in this program are those related to commercial activities, which include the three surplus experimental and test reactors [(MSRE, HRE-2, and the Low Intensity Test Reactor (LITR)] and seven experimental loops at the ORR. The program is an integral part of the Surplus Facilities Management Program, which is a national program administered for DOE by the Richland Operations Office. Very briefly reported here are routine surveillance and maintenance of surplus radioactively contaminated DOE facilities awaiting decommissioning

  2. Knowledge management program

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, T. [CANDU Owners' Group, Toronto, Ontario (Canada)

    2013-07-01

    To capture and retain the CANDU experience from a wider CANDU base and transfer knowledge and experience to our members, supplier participants and universities in a cost effective manner. Major focus area of the program is knowledge management joint projects, generic training delivery, inter-utilities mentoring and technical support, public education programs. The path forward is execution of transition of OPG NPDS Program as an ongoing program in COG with member funding, pursue opportunities to provide member utilities with additional leadership and train-the-trainer training and grow the knowledge management activities by 20% per year based on 2013/2014 results.

  3. Knowledge management program

    International Nuclear Information System (INIS)

    Henderson, T.

    2013-01-01

    To capture and retain the CANDU experience from a wider CANDU base and transfer knowledge and experience to our members, supplier participants and universities in a cost effective manner. Major focus area of the program is knowledge management joint projects, generic training delivery, inter-utilities mentoring and technical support, public education programs. The path forward is execution of transition of OPG NPDS Program as an ongoing program in COG with member funding, pursue opportunities to provide member utilities with additional leadership and train-the-trainer training and grow the knowledge management activities by 20% per year based on 2013/2014 results.

  4. The standard for program management

    CERN Document Server

    2017-01-01

    The Standard for Program Management – Fourth Edition differs from prior editions by focusing on the principles of good program management. Program activities have been realigned to program lifecycle phases rather than topics, and the first section was expanded to address the key roles of program manager, program sponsor and program management office. It has also been updated to better align with PMI’s Governance of Portfolios, Programs, and Projects: A Practice Guide.

  5. Enhanced human performance of utility maintenance programs

    International Nuclear Information System (INIS)

    Fresco, A.; Haber, S.; O'Brien, J.

    1993-01-01

    Assuring the safe operation of a nuclear power plant depends, to a large extent, on how effectively one understands and manages the aging-related degradation that occurs in structures, systems, and components (SSCs). Aging-related degradation is typically managed through a nuclear plant's maintenance program. A review of 44 Maintenance Team Inspection (MTI) Reports indicated that while some plant organizations appeared to assume a proactive mode in preventing aging-related failures of their SSCs important to safety, others seemed to be taking a passive or reactive mode. Across all plants, what is clearly needed, is a strong recognition of the importance of aging-related degradation and the use of existing organizational assets to effectively detect and mitigate those effects. Many of those assets can be enhanced by the consideration of organizational and management factors necessary for the implementation of an effective aging management program. This report provides a discussion of this program

  6. Quality Management Program

    International Nuclear Information System (INIS)

    1991-10-01

    According to section 35.32, ''Quality Management Program,'' of 10 CFR Part 35, ''Medical Use of Byproduct Material,'' applicants or licensees, as applicable, are required to establish a quality management (QM) program. This regulatory guide provides guidance to licensees and applicants for developing policies and procedures for the QM program. This guide does not restrict or limit the licensee from using other guidance that may be equally useful in developing a QM program, e.g., information available from the Joint Commission on Accreditation of Healthcare Organizations or the American College of Radiology. Any information collection activities mentioned in this regulatory guide are contained as requirements in 10 CFR Part 35, which provides the regulatory basis for this guide. This information collection requirements in 10 CFR Part 35 have been cleared under OMB Clearance No. 3150-0010

  7. NPS TINYSCOPE program management

    OpenAIRE

    Turner, Christopher Gordon.

    2010-01-01

    Approved for public release; distribution is unlimited This master's thesis introduces the program management and concept of operations of the TINYSCOPE Program. TINYSCOPE is a 6U CubeSat designed as a low-cost and easily replaceable imaging spacecraft that can produce tactically relevant imagery data. Tactical requirements in this context would emphasize "good enough" image resolution with a rapid-response tasking loop and high revisit rate. The TINYSCOPE project intends to demonstra...

  8. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  9. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  10. Russia air management program

    Energy Technology Data Exchange (ETDEWEB)

    Pace, T.G. [U.S. Environmental Protection Agency, NC (United States); Markin, S. [Ministry of Environmental Protection and Natural Resources, Moscow (Sweden); Kosenkova, S.V. [Volgograd Environmental Services Administration, Volgograd (Russian Federation)

    1995-12-31

    The Russia Air Management Program is in the second year of a four-year cooperative program between the Russian Ministry of Environmental Protection and Natural Resources (MEPNR) and the U.S. Environmental Protection Agency (EPA) to improve national institutions, policies, and practices for air quality management in Russia. This program is part of the Environmental Policy and Technology project being conducted by the U.S. Agency for International Development. The Russia Air Management Program will pilot the application of potential air program improvements in the important industrial City of Volgograd which will enable the development, practical demonstration and evaluation of alternative approaches for improving AQM policies and practices in Russia. Volgograd has a progressive and environmentally enlightened local government, a diverse industrial base and a relatively healthy economy. It is located south of Moscow on the Volga River and was proposed by the Ministry of Environmental Protection and Natural Resources. It was selected after a site visit and a series of discussions with the Ministry, Volgograd officials, the World Bank and the EPA. Following the pilot, RAMP will work to facilitate implementation of selected parts of the pilot in other areas of Russia using training, technology transfer, and public awareness. (author)

  11. Russia air management program

    International Nuclear Information System (INIS)

    Pace, T.G.; Markin, S.; Kosenkova, S.V.

    1995-01-01

    The Russia Air Management Program is in the second year of a four-year cooperative program between the Russian Ministry of Environmental Protection and Natural Resources (MEPNR) and the U.S. Environmental Protection Agency (EPA) to improve national institutions, policies, and practices for air quality management in Russia. This program is part of the Environmental Policy and Technology project being conducted by the U.S. Agency for International Development. The Russia Air Management Program will pilot the application of potential air program improvements in the important industrial City of Volgograd which will enable the development, practical demonstration and evaluation of alternative approaches for improving AQM policies and practices in Russia. Volgograd has a progressive and environmentally enlightened local government, a diverse industrial base and a relatively healthy economy. It is located south of Moscow on the Volga River and was proposed by the Ministry of Environmental Protection and Natural Resources. It was selected after a site visit and a series of discussions with the Ministry, Volgograd officials, the World Bank and the EPA. Following the pilot, RAMP will work to facilitate implementation of selected parts of the pilot in other areas of Russia using training, technology transfer, and public awareness. (author)

  12. Russia air management program

    Energy Technology Data Exchange (ETDEWEB)

    Pace, T G [U.S. Environmental Protection Agency, NC (United States); Markin, S [Ministry of Environmental Protection and Natural Resources, Moscow (Sweden); Kosenkova, S V [Volgograd Environmental Services Administration, Volgograd (Russian Federation)

    1996-12-31

    The Russia Air Management Program is in the second year of a four-year cooperative program between the Russian Ministry of Environmental Protection and Natural Resources (MEPNR) and the U.S. Environmental Protection Agency (EPA) to improve national institutions, policies, and practices for air quality management in Russia. This program is part of the Environmental Policy and Technology project being conducted by the U.S. Agency for International Development. The Russia Air Management Program will pilot the application of potential air program improvements in the important industrial City of Volgograd which will enable the development, practical demonstration and evaluation of alternative approaches for improving AQM policies and practices in Russia. Volgograd has a progressive and environmentally enlightened local government, a diverse industrial base and a relatively healthy economy. It is located south of Moscow on the Volga River and was proposed by the Ministry of Environmental Protection and Natural Resources. It was selected after a site visit and a series of discussions with the Ministry, Volgograd officials, the World Bank and the EPA. Following the pilot, RAMP will work to facilitate implementation of selected parts of the pilot in other areas of Russia using training, technology transfer, and public awareness. (author)

  13. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  14. Performance management system enhancement and maintenance

    Science.gov (United States)

    Cleaver, T. G.; Ahour, R.; Johnson, B. R.

    1984-01-01

    The research described in this report concludes a two-year effort to develop a Performance Management System (PMS) for the NCC computers. PMS provides semi-automated monthly reports to NASA and contractor management on the status and performance of the NCC computers in the TDRSS program. Throughout 1984, PMS was tested, debugged, extended, and enhanced. Regular PMS monthly reports were produced and distributed. PMS continues to operate at the NCC under control of Bendix Corp. personnel.

  15. Enhanced project management tool

    Science.gov (United States)

    Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  16. Asset management program

    International Nuclear Information System (INIS)

    Wison, P.; Newman, G.

    2013-01-01

    In order to understand our assets we have been assessing the condition of the units in our nuclear power plants developing asset life management options on a component by component basis. We have concluded that with the right work and planning we will be able to manage the units in a way that balances capacity requirements over the long term and at the same time manage the demand on critical resources. Major component replacement outages include Installing/removing bulkheads, pressure tube and calandria tube replacement, feeder replacement, steam generator replacement, supporting facilities and infrastructure, reactor inspections and maintenance including tooling enhancements, additional non reactor systems inspection & testing and continued research and analysis. These plans will have to take into account cost, resource and capacity requirements.

  17. Enhancing Survivorship Care Planning for Patients With Localized Prostate Cancer Using a Couple-Focused mHealth Symptom Self-Management Program: Protocol for a Feasibility Study.

    Science.gov (United States)

    Song, Lixin; Dunlap, Kaitlyn L; Tan, Xianming; Chen, Ronald C; Nielsen, Matthew E; Rabenberg, Rebecca L; Asafu-Adjei, Josephine K; Koontz, Bridget F; Birken, Sarah A; Northouse, Laurel L; Mayer, Deborah K

    2018-02-26

    This project explores a new model of care that enhances survivorship care planning and promotes health for men with localized prostate cancer transitioning to posttreatment self-management. Survivorship care planning is important for patients with prostate cancer because of its high incidence rate in the United States, the frequent occurrence of treatment-related side effects, and reduced quality of life (QOL) for both men and their partners. A key component of comprehensive survivorship care planning is survivorship care plans (SCPs), documents that summarize cancer diagnosis, treatment, and plans for follow-up care. However, research concerning the effectiveness of SCPs on patient outcomes or health service use has thus far been inconclusive. SCPs that are tailored to individual patients' needs for information and care may improve effectiveness. This study aims to examine the feasibility of an enhanced survivorship care plan (ESCP) that integrates a symptom self-management mHealth program called Prostate Cancer Education and Resources for Couples (PERC) into the existing standardized SCP. The specific aims are to (1) examine the feasibility of delivering ESCPs and (2) to estimate the magnitude of benefit of ESCPs. We will use a two-group randomized controlled pretest-posttest design and collect data at baseline (T1) and 4 months later (T2) among 50 patients completing initial treatment for localized prostate cancer and their partners. First, we will assess the feasibility of ESCP by recruitment, enrollment, and retention rates; program satisfaction with the ESCP; and perceived ease of use of the ESCP. To achieve the secondary aim, we will compare the ESCP users with the standardized SCP users and assess their primary outcomes of QOL (overall, physical, emotional, and social QOL); secondary outcomes (reduction in negative appraisals and improvement in self-efficacy, social support, and health behaviors to manage symptoms); and number of visits to posttreatment

  18. Enhancing programming logic thinking using analogy mapping

    Science.gov (United States)

    Sukamto, R. A.; Megasari, R.

    2018-05-01

    Programming logic thinking is the most important competence for computer science students. However, programming is one of the difficult subject in computer science program. This paper reports our work about enhancing students' programming logic thinking using Analogy Mapping for basic programming subject. Analogy Mapping is a computer application which converts source code into analogies images. This research used time series evaluation and the result showed that Analogy Mapping can enhance students' programming logic thinking.

  19. Reservoir Engineering Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Howard, J.H.; Schwarz, W.J.

    1977-12-14

    The Reservoir Engineering Management Program being conducted at Lawrence Berkeley Laboratory includes two major tasks: 1) the continuation of support to geothermal reservoir engineering related work, started under the NSF-RANN program and transferred to ERDA at the time of its formation; 2) the development and subsequent implementation of a broad plan for support of research in topics related to the exploitation of geothermal reservoirs. This plan is now known as the GREMP plan. Both the NSF-RANN legacies and GREMP are in direct support of the DOE/DGE mission in general and the goals of the Resource and Technology/Resource Exploitation and Assessment Branch in particular. These goals are to determine the magnitude and distribution of geothermal resources and reduce risk in their exploitation through improved understanding of generically different reservoir types. These goals are to be accomplished by: 1) the creation of a large data base about geothermal reservoirs, 2) improved tools and methods for gathering data on geothermal reservoirs, and 3) modeling of reservoirs and utilization options. The NSF legacies are more research and training oriented, and the GREMP is geared primarily to the practical development of the geothermal reservoirs. 2 tabs., 3 figs.

  20. DEFENSE PROGRAMS RISK MANAGEMENT FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Constantin PREDA

    2012-01-01

    Full Text Available For the past years defense programs have faced delays in delivering defense capabilities and budget overruns. Stakeholders are looking for ways to improve program management and the decision making process given the very fluid and uncertain economic and political environment. Consequently, they have increasingly resorted to risk management as the main management tool for achieving defense programs objectives and for delivering the defense capabilities strongly needed for the soldiers on the ground on time and within limited defense budgets. Following a risk management based decision-making approach the stakeholders are expected not only to protect program objectives against a wide range of risks but, at the same time, to take advantage of the opportunities to increase the likelihood of program success. The prerequisite for making risk management the main tool for achieving defense programs objectives is the design and implementation of a strong risk management framework as a foundation providing an efficient and effective application of the best risk management practices. The aim of this paper is to examine the risk management framework for defense programs based on the ISO 31000:2009 standard, best risk management practices and the defense programs’ needs and particularities. For the purposes of this article, the term of defense programs refers to joint defense programs.

  1. Effect of the School-Based Telemedicine Enhanced Asthma Management (SB-TEAM) Program on Asthma Morbidity: A Randomized Clinical Trial.

    Science.gov (United States)

    Halterman, Jill S; Fagnano, Maria; Tajon, Reynaldo S; Tremblay, Paul; Wang, Hongyue; Butz, Arlene; Perry, Tamara T; McConnochie, Kenneth M

    2018-03-05

    Poor adherence to recommended preventive asthma medications is common, leading to preventable morbidity. We developed the School-Based Telemedicine Enhanced Asthma Management (SB-TEAM) program to build on school-based supervised therapy programs by incorporating telemedicine at school to overcome barriers to preventive asthma care. To evaluate the effect of the SB-TEAM program on asthma morbidity among urban children with persistent asthma. In this randomized clinical trial, children with persistent asthma aged 3 to 10 years in the Rochester City School District in Rochester, New York, were stratified by preventive medication use at baseline and randomly assigned to the SB-TEAM program or enhanced usual care for 1 school year. Participants were enrolled at the beginning of the school year (2012-2016), and outcomes were assessed through the end of the school year. Data were analyzed between May 2017 and November 2017 using multivariable modified intention-to-treat analyses. Supervised administration of preventive asthma medication at school as well as 3 school-based telemedicine visits to ensure appropriate assessment, preventive medication prescription, and follow-up care. The school site component of the telemedicine visit was completed by telemedicine assistants, who obtained history and examination data. These data were stored in a secure virtual waiting room and then viewed by the primary care clinician, who completed the assessment and communicated with caregivers via videoconference or telephone. Preventive medication prescriptions were sent to pharmacies that deliver to schools for supervised daily administration. The primary outcome was the mean number of symptom-free days per 2 weeks, assessed by bimonthly blinded interviews. Of the 400 enrolled children, 247 (61.8%) were male and 230 (57.5%) were African American, and the mean (SD) age was 7.8 (1.7) years. Demographic characteristics and asthma severity in the 2 groups were similar at baseline. Among

  2. FLUOR HANFORD SAFETY MANAGEMENT PROGRAMS

    Energy Technology Data Exchange (ETDEWEB)

    GARVIN, L. J.; JENSEN, M. A.

    2004-04-13

    This document summarizes safety management programs used within the scope of the ''Project Hanford Management Contract''. The document has been developed to meet the format and content requirements of DOE-STD-3009-94, ''Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses''. This document provides summary descriptions of Fluor Hanford safety management programs, which Fluor Hanford nuclear facilities may reference and incorporate into their safety basis when producing facility- or activity-specific documented safety analyses (DSA). Facility- or activity-specific DSAs will identify any variances to the safety management programs described in this document and any specific attributes of these safety management programs that are important for controlling potentially hazardous conditions. In addition, facility- or activity-specific DSAs may identify unique additions to the safety management programs that are needed to control potentially hazardous conditions.

  3. The disease management program for type 2 diabetes in Germany enhances process quality of diabetes care - a follow-up survey of patient's experiences.

    Science.gov (United States)

    Schäfer, Ingmar; Küver, Claudia; Gedrose, Benjamin; Hoffmann, Falk; Russ-Thiel, Barbara; Brose, Hans-Peter; van den Bussche, Hendrik; Kaduszkiewicz, Hanna

    2010-03-03

    In summer 2003 a disease management program (DMP) for type 2 diabetes was introduced on a nationwide basis in Germany. Patient participation and continuity of care within the DMP are important factors to achieve long-term improvements in clinical endpoints. Therefore it is of interest, if patients experience any positive or negative effects of the DMP on their treatment that would support or hamper further participation. The main objective of the study was to find out if the German Disease Management Program (DMP) for type 2 diabetes improves process and outcome quality of medical care for patients in the light of their subjective experiences over a period of one year. Cohort study with a baseline interview and a follow-up after 10.4 +/- 0.64 months. Data on process and outcome measures were collected by telephone interviews with 444 patients enrolled and 494 patients not enrolled in the German DMP for type 2 diabetes. Data were analyzed by multivariate logistic regression analyses. DMP enrolment was significantly associated with a higher process quality of care. At baseline enrolled patients more often reported that they had attended a diabetes education course (OR = 3.4), have > or = 4 contacts/year with the attending physician (OR = 3.3), have at least one annual foot examination (OR = 3.1) and one referral to an ophthalmologist (OR = 3.4) and possess a diabetes passport (OR = 2.4). Except for the annual referral to an ophthalmologist these parameters were also statistically significant at follow-up. In contrast, no differences between enrolled and not enrolled patients were found concerning outcome quality indicators, e.g. self-rated health, Glycated hemoglobin (GHb) and blood pressure. However, 16-36% of the DMP participants reported improvements of body weight and/or GHb and/or blood pressure values due to enrolment - unchanged within one year of follow-up. In the light of patient's experiences the DMP enhances the process quality of medical care for type 2

  4. Economic evaluation of a mentorship and enhanced supervision program to improve quality of integrated management of childhood illness care in rural Rwanda.

    Science.gov (United States)

    Manzi, Anatole; Mugunga, Jean Claude; Iyer, Hari S; Magge, Hema; Nkikabahizi, Fulgence; Hirschhorn, Lisa R

    2018-01-01

    Integrated management of childhood illness (IMCI) can reduce under-5 morbidity and mortality in low-income settings. A program to strengthen IMCI practices through Mentorship and Enhanced Supervision at Health centers (MESH) was implemented in two rural districts in eastern Rwanda in 2010. We estimated cost per improvement in quality of care as measured by the difference in correct diagnosis and correct treatment at baseline and 12 months of MESH. Costs of developing and implementing MESH were estimated in 2011 United States Dollars (USD) from the provider perspective using both top-down and bottom-up approaches, from programmatic financial records and site-level data. Improvement in quality of care attributed to MESH was measured through case management observations (n = 292 cases at baseline, 413 cases at 12 months), with outcomes from the intervention already published. Sensitivity analyses were conducted to assess uncertainty under different assumptions of quality of care and patient volume. The total annual cost of MESH was US$ 27,955.74 and the average cost added by MESH per IMCI patient was US$1.06. Salary and benefits accounted for the majority of total annual costs (US$22,400 /year). Improvements in quality of care after 12 months of MESH implementation cost US$2.95 per additional child correctly diagnosed and $5.30 per additional child correctly treated. The incremental costs per additional child correctly diagnosed and child correctly treated suggest that MESH could be an affordable method for improving IMCI quality of care elsewhere in Rwanda and similar settings. Integrating MESH into existing supervision systems would further reduce costs, increasing potential for spread.

  5. GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION.

    Energy Technology Data Exchange (ETDEWEB)

    PAQUETTE,D.E.; BENNETT,D.B.; DORSCH,W.R.; GOODE,G.A.; LEE,R.J.; KLAUS,K.; HOWE,R.F.; GEIGER,K.

    2002-05-31

    THE DEPARTMENT OF ENERGY ORDER 5400.1, GENERAL ENVIRONMENTAL PROTECTION PROGRAM, REQUIRES THE DEVELOPMENT AND IMPLEMENTATION OF A GROUNDWATER PROTECTION PROGRAM. THE BNL GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION PROVIDES AN OVERVIEW OF HOW THE LABORATORY ENSURES THAT PLANS FOR GROUNDWATER PROTECTION, MONITORING, AND RESTORATION ARE FULLY DEFINED, INTEGRATED, AND MANAGED IN A COST EFFECTIVE MANNER THAT IS CONSISTENT WITH FEDERAL, STATE, AND LOCAL REGULATIONS.

  6. Strategic management of population programs

    OpenAIRE

    Bernhart, Michael H.

    1992-01-01

    Formal strategic planning and management appear to contribute to organizational effectiveness. The author surveys the literature on strategic management in private/for-profit organizations and applies lessons from that literature to population programs. Few would argue that population programs would not benefit from strategic planning and management, but it would be inadvisable to initiate the process when the organization is faced with a short-term crisis; during or immediately before a chan...

  7. Timber management planning with timber ram and goal programming

    Science.gov (United States)

    Richard C. Field

    1978-01-01

    By using goal programming to enhance the linear programming of Timber RAM, multiple decision criteria were incorporated in the timber management planning of a National Forest in the southeastern United States. Combining linear and goal programming capitalizes on the advantages of the two techniques and produces operationally feasible solutions. This enhancement may...

  8. 14 CFR 91.1017 - Amending program manager's management specifications.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Amending program manager's management... Ownership Operations Program Management § 91.1017 Amending program manager's management specifications. (a... specifications; or (2) The program manager applies for the amendment of any management specifications, and the...

  9. Electronuclear's safety culture assessment and enhancement program

    International Nuclear Information System (INIS)

    Selvatici, E.; Diaz-Francisco, J.M.; Diniz de Souza, V.

    2002-01-01

    The present paper describes the Eletronuclear's safety culture assessment and enhancement program. The program was launched by the company's top management one year after the creation of Eletronuclear in 1997, from the merging of two companies with different organizational cultures, the design and engineering company Nuclen and the nuclear directorate of the Utility Furnas, Operator of the Angra1 NPP. The program consisted of an assessment performed internally in 1999 with the support and advice of the IAEA. This assessment, performed with the help of a survey, pooled about 80% of the company's employees. The overall result of the assessment was that a satisfactory level of safety culture existed; however, a number of points with a considerable margin for improvement were also identified. These points were mostly related with behavioural matters such as motivation, stress in the workplace, view of mistakes, handling of conflicts, and last but not least a view by a considerable number of employees that a conflict between safety and production might exist. An Action Plan was established by the company managers to tackle these weak points. This Plan was issued as company guideline by the company's Directorate. The subsequent step was to detail and implement the different actions of the Plan, which is the phase that we are at present. In the detailing of the Action Plan, special care was taken to sum up efforts, avoiding duplication of work or competition with already existing programs. In this process it was identified that the company had a considerable number of initiatives directly related to organizational and safety culture improvement, already operational. These initiatives have been integrated in the detailed Action Plan. A new assessment, for checking the effectiveness of the undertaken actions, is planned for 2003. (author)

  10. Environmental Management Science Program Workshop

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-07-01

    This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.

  11. Speed management program plan.

    Science.gov (United States)

    2014-05-01

    Changing public attitudes regarding speeding and speed management will require a comprehensive and concerted effort, involving a wide variety of strategies. This plan identifies six primary focus areas: : A. Data and Data-Driven Approaches, : B. Rese...

  12. Transit management certificate program.

    Science.gov (United States)

    2012-07-01

    TTI worked closely with the Landscape Architecture and Urban Planning Department : (LAUP) of Texas A&M University (TAMU) to develop a transit management certificate : focus for the current Graduate Certificate in Transportation Planning (CTP) housed ...

  13. Federal Energy Management Program Overview

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-08-05

    Brochure offers an overview of the Federal Energy Management Program (FEMP), which provides agencies and organizations with the information, tools, and assistance they need to achieve their energy-related requirements and goals through specialized initiatives.

  14. Enrollment of SME Managers to Growth-oriented Training Programs

    DEFF Research Database (Denmark)

    Bager, Torben; Jensen, Kent Wickstrøm; Schou Nielsen, Pia

    2015-01-01

    Purpose: Entrepreneurial learning through formal growth-oriented training programs for SME managers promises to enhance the growth competences and growth intentions of the enrolled managers. The impact of such programs, however, depends on who enrolls since initial competence and growth-intention......Purpose: Entrepreneurial learning through formal growth-oriented training programs for SME managers promises to enhance the growth competences and growth intentions of the enrolled managers. The impact of such programs, however, depends on who enrolls since initial competence and growth...... has from 2012 to 2015 trained about 700 SME managers. Data are currently available for 366 of these participants. This evidence is compared with survey results from a randomly selected control group of 292 growth oriented SME managers in the same firm-size group. The data were analyzed through...... of the program. Originality/value The paper is the first systematic study of the importance of who enrolls in training programs for SME managers....

  15. NPP Krsko Aging Management Program

    International Nuclear Information System (INIS)

    Glaser, B.; Spiler, J.

    2002-01-01

    As a part of Periodic Safety Review Program (PSR) NEK will review and perform some activities related to Equipment Qualification (EQ) and Aging Management Program (AMP). (EQ) and AMP are safety factors, which need to be assessed during PSR. The goal of PSR and AMP is to determine aging effects and give the conclusion whether the plant has been managed to control aging related degradations and that safety margins are maintained. The parallel goal is also to establish AMP for future plant operation and provide basis for possible Life Extension Program. NEK will develop NEK Aging and Life Cycle Management Program, similar by format and content to one determined by License Renewal program. The bases are in 10CFR54, and NEI 95-10 Industry Guidelines for 10 CFR 54 implementation. The process of establishment the AMP is to be done in two steps. The first step is dealing with SSC's (Systems Structures and Components) scoping and screening and identification of TLAA's (Time Limited Aging Analyses). That means, that a database of all SSC's and TLAA's will be created and then evaluated within AMP program. Based on the scope in first phase an evaluation will be performed in step two. NEK will maintain AMP program as a living program that may be also used for Life Extension and Life Cycle Management. This paper will present and describe AMP, scoping and screening process and the results achieved through the first phase of the project.(author)

  16. ERDA waste management program

    International Nuclear Information System (INIS)

    Kuhlman, C.W.

    1976-01-01

    The ERDA commercial waste program is summarized. It consists of three parts: terminal storage, processing, and preparation of the Generic Environmental Impact Statement. Emplacement in geologic formations is the best disposal method for high-level waste; migration would be essentially zero, as it was in the Oklo event. Solidification processes are needed. Relations with the states, etc. are touched upon

  17. Aircrew team management program

    Science.gov (United States)

    Margerison, Charles; Mccann, Dick; Davies, Rod

    1987-01-01

    The key features of the Aircrew Team Management Workshop which was designed for and in consultation with Trans Australia Airlines are outlined. Five major sections are presented dealing with: (1) A profile of the airline and the designers; (2) Aircrew consultation and involvement; (3) Educational design and development; (4) Implementation and instruction; and (5) Evaluation and assessment. These areas are detailed.

  18. A Program Management Framework for Facilities Managers

    Science.gov (United States)

    King, Dan

    2012-01-01

    The challenge faced by senior facility leaders is not how to execute a single project, but rather, how to successfully execute a large program consisting of hundreds of projects. Senior facilities officers at universities, school districts, hospitals, airports, and other organizations with extensive facility inventories, typically manage project…

  19. Establishments of scientific radiation protection management program

    International Nuclear Information System (INIS)

    Pan Ziqiang

    1988-01-01

    Some aspects for establishing the radiation protection management program have been discussed. Radiation protection management program includes: definite aims of management, complete data register, strict supervision system, and scientific management methodology

  20. Multidisciplinary pain management programs.

    OpenAIRE

    Kaiser, Ulrike; Arnold, Bernhard; Pfingsten, Michael; Nagel, Bernd; Lutz, Johannes; Sabatowski, Rainer

    2013-01-01

    Ulrike Kaiser,1 Bernhard Arnold,2 Michael Pfingsten,3 Bernd Nagel,4 Johannes Lutz,5 Rainer Sabatowski1,61Comprehensive Pain Center, University Hospital “Carl Gustav Carus”, Dresden, 2Department of Pain Management, Klinikum Dachau, Dachau, 3Pain Clinic, University Medicine, University of Göttingen, 4Day Care Unit, DRK Pain Center, Mainz, 5Interdisciplinary Pain Center, Zentralklinik Bad Berka, Bad Berka, 6Department of Anesthesiology and Intensive Care, University ...

  1. Highly Enhanced Risk Management Emergency Satellite

    DEFF Research Database (Denmark)

    Dalmeir, Michael; Gataullin, Yunir; Indrajit, Agung

    HERMES (Highly Enhanced Risk Management Emergency Satellite) is potential European satellite mission for global flood management, being implemented by Technical University Munich and European Space Agency. With its main instrument - a reliable and precise Synthetic Aperture Radar (SAR) antenna...

  2. Enhancement of Linear Circuit Program

    DEFF Research Database (Denmark)

    Gaunholt, Hans; Dabu, Mihaela; Beldiman, Octavian

    1996-01-01

    In this report a preliminary user friendly interface has been added to the LCP2 program making it possible to describe an electronic circuit by actually drawing the circuit on the screen. Component values and other options and parameters can easily be set by the aid of the interface. The interface...

  3. Multidisciplinary pain management programs

    Directory of Open Access Journals (Sweden)

    Kaiser U

    2013-05-01

    Full Text Available Ulrike Kaiser,1 Bernhard Arnold,2 Michael Pfingsten,3 Bernd Nagel,4 Johannes Lutz,5 Rainer Sabatowski1,61Comprehensive Pain Center, University Hospital “Carl Gustav Carus”, Dresden, 2Department of Pain Management, Klinikum Dachau, Dachau, 3Pain Clinic, University Medicine, University of Göttingen, 4Day Care Unit, DRK Pain Center, Mainz, 5Interdisciplinary Pain Center, Zentralklinik Bad Berka, Bad Berka, 6Department of Anesthesiology and Intensive Care, University Hospital “Carl Gustav Carus”, Dresden, Germany

  4. Waste Management Operations Program

    International Nuclear Information System (INIS)

    Sease, J.D.

    1983-01-01

    The major function of the Program is to operate the Laboratory's systems and facilities for collecting and disposing of radioactive gaseous, liquid, and solid wastes. This includes collection and shallow land burial of about 2000 m 3 of β-γ contaminated waste and retrievable storage of about 60 m 3 of transuranium contaminated waste annually; ion-exchange treatment and release to the environment of about 450 x 10 3 m 3 of slightly contaminated water; volume reduction by evaporation of about 5000 m 3 of intermediate-level liquid waste followed by hydrofracture injection of the concentrate; and scrubbing and/or filtration of the gases from radioactive operations prior to release to the atmosphere. In addition, this year disposal of about 350,000 gal of radioactive sludge from the old (no longer in service) gunite tanks began. Operations are in conformance with rules and regulations presently applicable to ORNL. This Program is responsible for planning and for development activities for upgrading the facilities, equipment, and procedures for waste disposal to ensure ORNL work incorporates the latest technology. Major (line-item) new facilities are provided as well as substantial (GPP) upgrading of old facilities. These activities as well as the technical and engineering support to handle them are discussed

  5. Human Resource Management in the Enhancement Processes of Knowledge Management

    Directory of Open Access Journals (Sweden)

    Didi Sundiman

    2017-11-01

    Full Text Available This research explored Human Resource Management (HRM in enhancement processes of knowledge management. This research explored how HRM practice enhanced the operational of knowledge management. Data were collected by a survey by interviewing 12 informants from Small and Medium Enterprise (SME. The results show that HRM practice gives initiative in the enhancement process of the knowledge management strategy applied to the company. It can be concluded that each sub-component of HRM affects the components of knowledge management, and HRM is highly influential and has a positive effect on quality management processes and vice versa in the work environment.

  6. Ageing Management Program Database

    International Nuclear Information System (INIS)

    Basic, I.; Vrbanic, I.; Zabric, I.; Savli, S.

    2008-01-01

    The aspects of plant ageing management (AM) gained increasing attention over the last ten years. Numerous technical studies have been performed to study the impact of ageing mechanisms on the safe and reliable operation of nuclear power plants. National research activities have been initiated or are in progress to provide the technical basis for decision making processes. The long-term operation of nuclear power plants is influenced by economic considerations, the socio-economic environment including public acceptance, developments in research and the regulatory framework, the availability of technical infrastructure to maintain and service the systems, structures and components as well as qualified personnel. Besides national activities there are a number of international activities in particular under the umbrella of the IAEA, the OECD and the EU. The paper discusses the process, procedure and database developed for Slovenian Nuclear Safety Administration (SNSA) surveillance of ageing process of Nuclear power Plant Krsko.(author)

  7. Defense Contract Management Command Support to System Acquisition Program Managers

    National Research Council Canada - National Science Library

    1999-01-01

    .... This report discusses the planning of contract administration office support to system acquisition program managers through the program integration process and the customer support outreach program...

  8. Equipment Obsolescence Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.

    2014-07-01

    Nuclear Power Plant (NPP) Operators are challenged with securing reliable supply channels for safety related equipment due to equipment obsolescence. Many Original Equipment Manufacturers (OEMs) have terminated production of spare parts and product life-cycle support. The average component life cycles are much shorter than the NPP design life, which means that replacement components and parts for the original NPP systems are not available for the complete design life of the NPPs. The lack or scarcity of replacement parts adversely affects plant reliability and ultimately the profitability of the affected NPPs. This problem is further compounded when NPPs pursue license renewal and approval for plant-life extension. A reliable and predictable supply of replacement co components is necessary for NPPs to remain economically competitive and meet regulatory requirements and guidelines. Electrical and I and C components, in particular, have short product life cycles and obsolescence issues must be managed pro actively and not reactively in order to mitigate the risk to the NPP to ensure reliable and economic NPP operation. (Author)

  9. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  10. The NASA risk management program

    International Nuclear Information System (INIS)

    Buchbinder, B.; Philipson, L.L.

    1989-01-01

    This paper reports that the NASA Risk Management Program has been established to ensure the appropriate application of risk-based procedures in support of the elimination, reduction, or acceptance of significant safety risks of concern in NASA. The term appropriate is emphasized, in that the particular procedures applied to each given risk are to reflect its character and prioritized importance, the technological and economic feasibility of its treatment. A number of key documents have been produced in support of this implementation. Databases, risk analysis tools, and risk communication procedures requisite to the execution of the risk management functions also are being developed or documented. Several risk management applications have been made and a comprehensive application to a major new NASA program is underway. This paper summarizes the development and current status of the NASA Risk Management Program. Some principal actions that have been carried out in NASA in consonance with the program are noted particularly, and views are presented on the program's likely future directions

  11. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  12. Space program management methods and tools

    CERN Document Server

    Spagnulo, Marcello; Balduccini, Mauro; Nasini, Federico

    2013-01-01

    Beginning with the basic elements that differentiate space programs from other management challenges, Space Program Management explains through theory and example of real programs from around the world, the philosophical and technical tools needed to successfully manage large, technically complex space programs both in the government and commercial environment. Chapters address both systems and configuration management, the management of risk, estimation, measurement and control of both funding and the program schedule, and the structure of the aerospace industry worldwide.

  13. Managing a mixed waste program

    International Nuclear Information System (INIS)

    Koch, J.D.

    1994-01-01

    IT Corporation operates an analytical laboratory in St. Louis capable of analyzing environmental samples that are contaminated with both chemical and radioactive materials. Wastes generated during these analyses are hazardous in nature; some are listed wastes others exhibit characteristic hazards. When the original samples contain significant quantities of radioactive material, the waste must be treated as a mixed waste. A plan was written to document the waste management program describing the management of hazardous, radioactive and mixed wastes. This presentation summarizes the methods employed by the St. Louis facility to reduce personnel exposures to the hazardous materials, minimize the volume of mixed waste and treat the materials prior to disposal. The procedures that are used and the effectiveness of each procedure will also be discussed. Some of the lessons that have been learned while dealing with mixed wastes will be presented as well as the solutions that were applied. This program has been effective in reducing the volume of mixed waste that is generated. The management program also serves as a method to manage the costs of the waste disposal program by effectively segregating the different wastes that are generated

  14. Indoor Air Quality Management Program.

    Science.gov (United States)

    Anne Arundel County Public Schools, Annapolis, MD.

    In an effort to provide Indoor Air Quality (IAQ) management guidance, Anne Arundel County Public Schools was selected by the Maryland State Department of Education to develop a program that could be used by other school systems. A major goal was to produce a handbook that was "user friendly." Hence, its contents are a mix of history,…

  15. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  16. Sport Management Graduate Programs: Characteristics of Effectiveness.

    Science.gov (United States)

    Li, Ming; And Others

    1994-01-01

    Reports a study that examined the characteristics that enable graduate sport management programs to achieve their objectives. Surveys of sport management educators found they agreed on 11 characteristics that indicated a sport management program's effectiveness. Respondents believed an effective program should produce sport managers, not…

  17. Home audit program: management manual

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    Many public power systems have initiated home energy audit programs in response to the requests of their consumers. The manual provides smaller public power systems with the information and specific skills needed to design and develop a program of residential energy audits. The program is based on the following precepts: locally owned public systems are the best, and in many cases the only agencies available to organize and coordinate energy conservation programs in many smaller communities; consumers' rights to energy conservation information and assistance should not hinge on the size of the utility that serves them; in the short run, public power systems of all sizes should offer residential energy conservation assistance to their consumers, because such assistance is desirable, necessary, and in the public interest; and in the long run, such programs will complement national energy goals and will produce economic benefits for both consumers and the public power system. A detailed description of home audit program planning, organization, and management are given. (MCW)

  18. 76 FR 39857 - Alaska Coastal Management Program Withdrawal From the National Coastal Management Program Under...

    Science.gov (United States)

    2011-07-07

    ... DEPARTMENT OF COMMERCE National Oceanic Atmospheric Administration Alaska Coastal Management Program Withdrawal From the National Coastal Management Program Under the Coastal Zone Management Act (CZMA) AGENCY: Office of Ocean and Coastal Resource Management (OCRM), National Ocean Service (NOS...

  19. Performance Enhancements for Advanced Database Management Systems

    OpenAIRE

    Helmer, Sven

    2000-01-01

    New applications have emerged, demanding database management systems with enhanced functionality. However, high performance is a necessary precondition for the acceptance of such systems by end users. In this context we developed, implemented, and tested algorithms and index structures for improving the performance of advanced database management systems. We focused on index structures and join algorithms for set-valued attributes.

  20. 76 FR 74842 - RTCA Program Management Committee

    Science.gov (United States)

    2011-12-01

    ... Minimum Aviation System Performance Standards (MASPS) for Advanced VHF Digital Data Communications... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration RTCA Program Management Committee... RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public...

  1. Establishing a total information management program

    International Nuclear Information System (INIS)

    Hegstrom, K.L.; Fisher, J.

    1982-01-01

    A total information management program manages documents for easy access and identifies data elements commonly found in all documents. The program thus links disparate documents by identifying information they share in common

  2. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  3. 10 CFR 800.002 - Program management.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE CONTRACTS AND ASSISTANCE General § 800.002 Program management. Program management responsibility for...

  4. 30 CFR 401.12 - Program management.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal year's...

  5. 20 CFR 638.800 - Program management.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management. 638.800 Section 638.800... TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.800 Program management. (a) The Job Corps Director shall establish and use internal program management procedures sufficient...

  6. 30 CFR 402.13 - Program management.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Program management. 402.13 Section 402.13... WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402.13 Program management. (a) After the conclusion of negotiations, the USGS will transmit a grant or...

  7. 14 CFR 1214.1706 - Program management.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Program management. 1214.1706 Section 1214... Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible for program management under the direction of the Committee chairperson. ...

  8. Potential transportation demand management programs and measures

    Energy Technology Data Exchange (ETDEWEB)

    Litman, T. [Victoria Transport Policy Institute, Victoria, BC (Canada)

    1997-02-07

    The advantages of transportation demand management (TDM) programs were discussed. TDM includes several policies, programs and measures designed to change travel patterns. TDM programs include commute trip reductions, pricing policies, land use management strategies, and programs to support alternative modes of transportation such as public transit, carpooling, bicycling, walking and telecommuting. TDM programs are designed to reduce traffic congestion and air pollution. Some other TDM programs and measures include: enabling programs, alternative mode encouragement, driving disincentives, parking programs, marginalizing user costs, reducing automobile ownership, and land use management.

  9. Total quality management program planning

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  10. Solid Waste Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  11. University Program Management Information System

    Science.gov (United States)

    Gans, Gary (Technical Monitor)

    2004-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  12. University Program Management Information System

    Science.gov (United States)

    2001-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA' objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  13. 40 CFR 130.11 - Program management.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Program management. 130.11 Section 130... PLANNING AND MANAGEMENT § 130.11 Program management. (a) State agencies may apply for grants under sections 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate...

  14. A yoga program for cognitive enhancement.

    Directory of Open Access Journals (Sweden)

    Devon Brunner

    Full Text Available Recent studies suggest that yoga practice may improve cognitive functioning. Although preliminary data indicate that yoga improves working memory (WM, high-resolution information about the type of WM subconstructs, namely maintenance and manipulation, is not available. Furthermore, the association between cognitive enhancement and improved mindfulness as a result of yoga practice requires empirical examination. The aim of the present study is to assess the impact of a brief yoga program on WM maintenance, WM manipulation and attentive mindfulness.Measures of WM (Digit Span Forward, Backward, and Sequencing, and Letter-Number Sequencing were administered prior to and following 6 sessions of yoga (N = 43. Additionally, the Mindfulness Attention Awareness Scale was administered to examine the potential impact of yoga practice on mindfulness, as well as the relationships among changes in WM and mindfulness.Analyses revealed significant improvement from pre- to post- training assessment on both maintenance WM (Digit Span Forward and manipulation WM (Digit Span Backward and Letter-Number Sequencing. No change was found on Digit Span Sequencing. Improvement was also found on mindfulness scores. However, no correlation was observed between mindfulness and WM measures.A 6-session yoga program was associated with improvement on manipulation and maintenance WM measures as well as enhanced mindfulness scores. Additional research is needed to understand the extent of yoga-related cognitive enhancement and mechanisms by which yoga may enhance cognition, ideally by utilizing randomized controlled trials and more comprehensive neuropsychological batteries.

  15. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  16. AECL's mixed waste management program

    International Nuclear Information System (INIS)

    Peori, R.; Hulley, V.

    2006-01-01

    Every nuclear facility has it, they wish that they didn't but they have generated and do possess m ixed waste , and until now there has been no permanent disposition option; it has been for the most been simply maintained in interim storage. The nuclear industry has been responsibly developing permanent solutions for solid radioactive waste for over fifty years and for non-radioactive, chemically hazardous waste, for the last twenty years. Mixed waste (radioactive and chemically hazardous waste) however, because of its special, duo-hazard nature, has been a continuing challenge. The Hazardous Waste and Segregation Program (HW and SP) at AECL's CRL has, over the past ten years, been developing solutions to deal with their own in-house mixed waste and, as a result, have developed solutions that they would like to share with other generators within the nuclear industry. The main aim of this paper is to document and describe the early development of the solutions for both aqueous and organic liquid wastes and to advertise to other generators of this waste type how these solutions can be implemented to solve their mixed waste problems. Atomic Energy of Canada Limited (AECL) and in particular, CRL has been satisfactorily disposing of mixed waste for the last seven years. CRL has developed a program that not only disposes of mixed waste, but offers a full service mixed waste management program to customers within Canada (that could eventually include U.S. sites as well) that has developed the experience and expertise to evaluate and optimize current practices, dispose of legacy inventories, and set up an efficient segregation system to reduce and effectively manage, both the volumes and expense of, the ongoing generation of mixed waste for all generators of mixed waste. (author)

  17. Repository-Based Software Engineering Program: Working Program Management Plan

    Science.gov (United States)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  18. Radioactive Waste Management Program Activities in Croatia

    International Nuclear Information System (INIS)

    Matanic, R.

    2000-01-01

    The concept of radioactive waste management in Croatia comprises three major areas: management of low and intermediate level radioactive waste (LILRW), spent fuel management and decommissioning. All the work regarding radioactive waste management program is coordinated by Hazardous Waste Management Agency (APO) and Croatian Power Utility (HEP) in cooperation with other relevant institutions. Since the majority of work has been done in developing low and intermediate level radioactive waste management program, the paper will focus on this part of radioactive waste management, mainly on issues of site selection and characterization, repository design, safety assessment and public acceptance. A short description of national radioactive waste management infrastructure will also be presented. (author)

  19. Managing Risk, Reducing Vulnerability and Enhancing Productivity ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Managing Risk, Reducing Vulnerability and Enhancing Productivity under a Changing Climate. The countries of the Greater Horn of Africa are particularly vulnerable to drought, exacerbated by widespread poverty and dependence on rainfed agriculture. Even with normal rainfall, the region does not produce enough food to ...

  20. Disease management: findings from leading state programs.

    Science.gov (United States)

    Wheatley, Ben

    2002-12-01

    Disease management programs are designed to contain costs by improving health among the chronically ill. More than 20 states are now engaged in developing and implementing Medicaid disease management programs for their primary care case management and fee-for-service populations.

  1. Evaluating and Selecting Sport Management Undergraduate Programs.

    Science.gov (United States)

    Cuneen, Jacquelyn; Sidwell, M. Joy

    1998-01-01

    States that the accelerated growth of sport management undergraduate programs that began in the 1980s has continued into the current decade. There are currently 180 sport management major programs in American colleges and universities. Describes the sports management approval process and suggests useful strategies to evaluate sport management…

  2. NASA and the Federal Management Intern Program.

    Science.gov (United States)

    Pound, Jack K.; Slack, Vivian M.

    A review of NASA Federal Management Intern (MI) programs indicates potential for identification, attraction, and early development of successful administrative management employees, but suggests that successful development of managers is a function of the long-term care with which an agency pursues MI programs. A recent study of separations in…

  3. Portfolio optimization in enhanced index tracking with goal programming approach

    Science.gov (United States)

    Siew, Lam Weng; Jaaman, Saiful Hafizah Hj.; Ismail, Hamizun bin

    2014-09-01

    Enhanced index tracking is a popular form of passive fund management in stock market. Enhanced index tracking aims to generate excess return over the return achieved by the market index without purchasing all of the stocks that make up the index. This can be done by establishing an optimal portfolio to maximize the mean return and minimize the risk. The objective of this paper is to determine the portfolio composition and performance using goal programming approach in enhanced index tracking and comparing it to the market index. Goal programming is a branch of multi-objective optimization which can handle decision problems that involve two different goals in enhanced index tracking, a trade-off between maximizing the mean return and minimizing the risk. The results of this study show that the optimal portfolio with goal programming approach is able to outperform the Malaysia market index which is FTSE Bursa Malaysia Kuala Lumpur Composite Index because of higher mean return and lower risk without purchasing all the stocks in the market index.

  4. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  5. Direct Student Loan Program: Management Actions Could Enhance Customer Service. Report to the Ranking Minority Member, Committee on Health, Education, Labor, and Pensions, U.S. Senate.

    Science.gov (United States)

    General Accounting Office, Washington, DC.

    This report suggests to congress that they consider clarifying whether Education may regulate the fees charged to borrowers under the Direct Loan Program. It also suggests that FSA collect information from schools that could be used to make improvements to the Direct Loan Program. (Author)

  6. Comparison of DOE and NIRMA approaches to configuration management programs

    International Nuclear Information System (INIS)

    Yang, E.Y.; Kulzick, K.C.

    1995-01-01

    One of the major management programs used for commercial, laboratory, and defense nuclear facilities is configuration management. The safe and efficient operation of a nuclear facility requires constant vigilance in maintaining the facility's design basis with its as-built condition. Numerous events have occurred that can be attributed to (either directly or indirectly) the extent to which configuration management principles have been applied. The nuclear industry, as a whole, has been addressing this management philosophy with efforts taken on by its constituent professional organizations. The purpose of this paper is to compare and contrast the implementation plans for enhancing a configuration management program as outlined in the U.S. Department of Energy's (DOE's) DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Program,close quotes with the following guidelines developed by the Nuclear Information and Records Management Association (NIRMA): 1. PP02-1994, open-quotes Position Paper on Configuration Managementclose quotes 2. PP03-1992, open-quotes Position Paper for Implementing a Configuration Management Enhancement Program for a Nuclear Facilityclose quotes 3. PP04-1994 open-quotes Position Paper for Configuration Management Information Systems.close quotes

  7. Intelligence Community Programs, Management, and Enduring Issues

    Science.gov (United States)

    2016-11-08

    books, journal papers, conference presentations, working papers, and other electronic and print publications. Intelligence Community Programs... Intelligence Community Programs, Management, and Enduring Issues Anne Daugherty Miles Analyst in Intelligence and National Security Policy...

  8. Global pest management program wins international award

    OpenAIRE

    Rich, Miriam Sommers

    2009-01-01

    An agricultural research program managed at Virginia Tech has won an international award for its work with pest-management practices that show economic benefits with minimal impact on health and the environment.

  9. The Air Program Information Management System (APIMS)

    Science.gov (United States)

    2011-11-02

    Technology November 2, 2011 The Air Program Information Management System (APIMS) Frank Castaneda, III, P.E. APIMS Program Manager AFCEE/TDNQ APIMS...NOV 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE The Air Program Information Management System (APIMS... Information   Management   System : Sustainability of  Enterprise air quality management system • Aspects and Impacts to Process • Auditing and Measurement

  10. Structure to utilize interventionists' implementation experiences of a family-based behavioral weight management program to enhance the dissemination of the standardized intervention: The TODAY study.

    Science.gov (United States)

    Chadwick, Jennifer Q; Van Buren, Dorothy J; Morales, Elisa; Timpson, Alexandra; Abrams, Ericka L; Syme, Amy; Preske, Jeff; Mireles, Gerardo; Anderson, Barbara; Grover, Nisha; Laffel, Lori

    2017-08-01

    Background For a 2- to 6-year period, interventionists for the TODAY (Treatment Options for type 2 Diabetes in Adolescents and Youth) randomized clinical trial delivered a family-based, behavioral weight-loss program (the TODAY Lifestyle Program) to 234 youth with type 2 diabetes. Interventionists held at least a bachelor's degree in psychology, social work, education, or health-related field and had experience working with children and families, especially from diverse ethnic and socioeconomic backgrounds. This article describes the administrative and organizational structure of the lifestyle program and how the structure facilitated collaboration among study leadership and lifestyle interventionists on the tailoring of the program to best suit the needs of the trial's diverse patient population. Methods During the pilot phase and throughout the duration of the trial, the interventionists' experiences in delivering the intervention were collected in a variety of ways including membership on study committees, survey responses, session audio recordings, and feedback during in-person trainings. Results The experiences of interventionists conveyed to study leadership through these channels resulted in decisions to tailor the lifestyle intervention's delivery location and ways to supplement the standardized educational materials to better address the needs of a diverse patient population. Conclusion The methods used within the TODAY study to encourage and utilize interventionists' experiences while implementing the lifestyle program may be useful to the design of future multi-site, clinical trials seeking to tailor behavioral interventions in a standardized, and culturally and developmentally sensitive manner.

  11. Advanced, enhanced HEX program for PIXE

    International Nuclear Information System (INIS)

    Lipworth, A.D.; Annegarn, H.J.; Kneen, M.A.

    1993-01-01

    The REX code and subsequent HEX code, originating at Florida State University, have been extensively used for PIXE spectra fitting. In 1989 we produce a renovated HEX package: WITS-HEX, enabling the original Fortran program to be more accessible to the PIXE community. We modernised the user interface by replacing the batch mode of operation with an integrated, menu-driven environment. We added the ability to edit support data files from within the program, provided detailed feedback during the fitting process and enhanced spectral plots using high resolution colour graphics. Our prototype also permitted the inclusion of many more peaks and absorption coefficients into the element library than the original HEX, permitting a more extensive element request list to be used during the fitting operation. We have now completed the second phase of the renewal of HEX. The man-machine interface has been upgraded to conform to the IBM SAA Common User Access (CUA) standard. This eliminated several of the sequential (modal) human-computer dialogues, replacing them with a single parallel system. The support utility used in WITS-HEX to convert the binary format of spectra captured using foreign data acquisition systems has been replaced by code to directly access data in ASCII format. The program is now equipped with context-sensitive help and a tutorial. The polynomial background mode has been supplemented by a digital filter model, eliminating the associated instability from the fitting process and other spectral features modelled. The program has been validated by comparing results with those obtained from the former versions: WITS-HEX and HEX. A demonstration version is available on request for evaluation purposes. (orig.)

  12. Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Urban, Mary Elizabeth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States). Process Modeling and Analysis Group

    2016-05-02

    Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, and monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.

  13. NASA Space Flight Program and Project Management Handbook

    Science.gov (United States)

    Blythe, Michael P.; Saunders, Mark P.; Pye, David B.; Voss, Linda D.; Moreland, Robert J.; Symons, Kathleen E.; Bromley, Linda K.

    2014-01-01

    This handbook is a companion to NPR 7120.5E, NASA Space Flight Program and Project Management Requirements and supports the implementation of the requirements by which NASA formulates and implements space flight programs and projects. Its focus is on what the program or project manager needs to know to accomplish the mission, but it also contains guidance that enhances the understanding of the high-level procedural requirements. (See Appendix C for NPR 7120.5E requirements with rationale.) As such, it starts with the same basic concepts but provides context, rationale, guidance, and a greater depth of detail for the fundamental principles of program and project management. This handbook also explores some of the nuances and implications of applying the procedural requirements, for example, how the Agency Baseline Commitment agreement evolves over time as a program or project moves through its life cycle.

  14. TRU Waste Management Program. Cost/schedule optimization analysis

    International Nuclear Information System (INIS)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A.

    1985-10-01

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions

  15. Tapping into the Forest Management Assistance Programs

    Science.gov (United States)

    John L. Greene; Terry K. Haines

    1998-01-01

    Use of federal and state forest management assistance programs can enable nonindustial private forest owners to reduce their management expenses and practice better stewardship. This paper summarizes six federal and twelve state assistance programs available to owners in the North Central states. It also describes how to calculate the amount of a government...

  16. Developing Program Management Leadership for Acquisition Reform

    Science.gov (United States)

    2011-04-30

    mêçÅÉÉÇáåÖë= çÑ=íÜÉ= bfdeqe=^kkr^i=^`nrfpfqflk== obpb^o`e=pvjmlpfrj== qeropa^v=pbppflkp== slirjb ff Developing Program Management Leadership for...4. TITLE AND SUBTITLE Developing Program Management Leadership for Acquisition Reform 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT...Developing Program  Management   Leadership   for Acquisition Reform    The 8th Annual Acquisition Research Symposium Panel #20: Investing in People

  17. Enhancing Global Health Security: US Africa Command's Disaster Preparedness Program.

    Science.gov (United States)

    Morton Hamer, Melinda J; Reed, Paul L; Greulich, Jane D; Beadling, Charles W

    2018-03-07

    US Africa Command's Disaster Preparedness Program (DPP), implemented by the Center for Disaster and Humanitarian Assistance Medicine, partnered with US Government agencies and international organizations to promote stability and security on the African continent by engaging with African Partner Nations' (PN) civil and military authorities to improve disaster management capabilities. From 2008 to 2015, DPP conducted disaster preparedness and response programming with 17 PNs. DPP held a series of engagements with each, including workshops, strategic planning, developing preparedness and response plans, tabletop exercises, and prioritizing disaster management capability gaps identified through the engagements. DPP partners collected data for each PN to further capacity building efforts. Thus far, 9 countries have completed military pandemic plans, 10 have developed national pandemic influenza plans, 9 have developed military support to civil authorities plans, and 11 have developed disaster management strategic work plans. There have been 20 national exercises conducted since 2009. DPP was cited as key in implementation of Ebola response plans in PNs, facilitated development of disaster management agencies in DPP PNs, and trained nearly 800 individuals. DPP enhanced PNs' ability to prepare and respond to crises, fostering relationships between international agencies, and improving civil-military coordination through both national and regional capacity building. (Disaster Med Public Health Preparedness. 2018;page 1 of 11).

  18. Clinical management IT system for enhanced recovery

    OpenAIRE

    Yi, Eunjue; Jheon, Sanghoon

    2016-01-01

    Surgical resection has a key role for the treatment of early stage lung cancer along with certain advanced cases, and minimally invasive techniques, representatively video-assisted thoracoscopic surgery (VATS), are becoming standard for lung cancer surgery. Implementation of integrated programs which could manage the whole process of patient treatment including preoperative, intraoperative and postoperative care is thought to be essential partner for successful application of minimally invasi...

  19. Assessment of an enhanced program for depression management in primary care: a cluster randomized controlled trial. The INDI project (Interventions for Depression Improvement

    Directory of Open Access Journals (Sweden)

    Hernández Josep M

    2007-09-01

    Full Text Available Abstract Background Most depressed patients are attended at primary care. However, there are significant shortcomings in the diagnosis, management and outcomes of these patients. The aim of this study is to determine whether the implementation of a structured programme for managing depression will provide better health outcomes than usual management. Methods/Design Design: A cluster-randomized controlled trial involving two groups, one of which is the control group consisting of patients who are treated for depression in the usual way and the other is the intervention group consisting of patients on a structured programme for treating depression. Setting: 20 primary care centres in the province of Tarragona (Spain Sample: 400 patients over 18 years of age who have experienced an episode of major depression (DSM-IV and who need to initiate antidepressant treatment Intervention: A multi-component programme with clinical, educational and organisational procedures that includes training for the health care provider and evidence-based clinical guidelines. It also includes primary care nurses working as care-managers who provide educational and emotional support for the patients and who are responsible for active and systematic clinical monitoring. The programme aims to improve the primary care/specialized level interface. Measurements: The patients will be monitored by telephone interviews. The interviewer will not know which group the patient belongs to (blind trial. These interviews will be given at 0, 3, 6 and 12 months. Main variables: Severity of the depressive symptoms, response rate and remission rate. Analysis: Outcomes will be analyzed on an intent-to-treat basis and the unit of analysis will be the individual patient. This analysis will take into account the effect of study design on potential lack of independence between observations within the same cluster. Discussion The effectiveness of caring for depression in primary care can be

  20. Building effective cybersecurity programs a security manager's handbook

    CERN Document Server

    Schreider, Tari

    2017-01-01

    You know by now that your company could not survive without the Internet. Not in today's market. You are either part of the digital economy or reliant upon it. With critical information assets at risk, your company requires a state-of-the-art cybersecurity program. But how do you achieve the best possible program? Tari Schreider, in Building Effective Cybersecurity Programs: A Security Manager's Handbook, lays out the step-by-step roadmap to follow as you build or enhance your cybersecurity program.

  1. Waste management in Canadian nuclear programs

    International Nuclear Information System (INIS)

    Dyne, P.J.

    1975-08-01

    The report describes the wide-ranging program of engineering developments and applications to provide the Canadian nuclear industry with the knowledge and expertise it needs to conduct its waste management program. The need for interim dry storage of spent fuel, and the storage and ultimate disposal of waste from fuel reprocessing are examined. The role of geologic storage in AECL's current waste management program is also considered. (R.A.)

  2. Benefits of a formal waste management program

    International Nuclear Information System (INIS)

    Wolfe, R.A.

    1974-01-01

    The proper management of waste is of vital importance in the conservation of our environment. Mound Laboratory, which is operated by Monsanto Research Corporation for the U. S. Atomic Energy Commission, has embarked upon a waste management program designed to assure that the generation, processing, storage, and disposal of waste is conducted in such a manner as to have a minimum impact on the environment. The organizational approach taken toward waste management is discussed and some of the benefits of the waste management program at Mound Laboratory are described. Ithas been shown that the utilization of proper waste management techniques can have economic, as well as environmental protection, benefits. (U.S.)

  3. Comprehensive quality management program for radiation oncology

    International Nuclear Information System (INIS)

    Dawson, J.; Roy, T.; Abrath, F.; Wu, T.; Gu, J.; McDonald, R.; Kim, H.; Haenchen, M.

    1994-01-01

    A quality management program for both external beam irradiation (electron and photon modes) and brachytherapy (high dose rate (HDR) and low dose rate (LDR) has been developed. The program follows current USA federal regulations for therapeutic administration of by-product materials. After implementation of the program, 54 HDR patients, 36 LDR brachytherapy patients and 311 external beam patients (including 30 stereotactic radiosurgery cases) were treated. The results of this program are presented

  4. Compromise Programming in forest management

    Science.gov (United States)

    Boris A. Poff; Aregai Tecle; Daniel G. Neary; Brian Geils

    2010-01-01

    Multi-objective decision-making (MODM) is an appropriate approach for evaluating a forest management scenario involving multiple interests. Today's land managers must accommodate commercial as well as non-commercial objectives that may be expressed quantitatively and/or qualitatively, and respond to social, political, economic and cultural changes. The spatial and...

  5. Program Manager’s Handbook

    Science.gov (United States)

    1989-03-01

    risk as early as cess control and process management are prin- possible and before Milestone II. Risk management ciples of the Deming philosophy for...operational concept dXcumcr t and software technical art form. The software development pro- development specifications. 4.16a Figure 1. LIFE CICLE

  6. Management plan for the Nuclear Standards Program

    International Nuclear Information System (INIS)

    1979-11-01

    This Management Plan was prepared to describe the manner in which Oak Ridge National Laboratory will provide technical management of the Nuclear Standards Program. The organizational structure that has been established within ORNL for this function is the Nuclear Standards Management Center, which includes the Nuclear Standards Office (NSO) already in existence at ORNL. This plan is intended to support the policies and practices for the development and application of technical standards in ETN projects, programs, and technology developments as set forth in a standards policy memorandum from the DOE Program Director for Nuclear Energy

  7. Figures of merit for measuring aging management program effectiveness

    International Nuclear Information System (INIS)

    Knudson, R.; Sciacca, F.; Walsh, R.; Zigler, G.

    1991-01-01

    One of the requirements for nuclear plant license renewal may be the establishment and demonstration of an effective aging management program. An analysis of both qualitative and quantitative information will be required to define the contents of this aging management program. The authors propose two quantitative figures of merit, Mean Event Detection Frequency and Mean Renewal Rate, that can be used to compare the effectiveness of various inspection, surveillance, test, and monitoring (ISTM) activities for aging mitigation. An example showing the relative effectiveness of an enhanced Loose Parts Monitoring System with current ISTM activities for steam generators and reactor internals is provided. (author)

  8. Management practices in substance abuse treatment programs.

    Science.gov (United States)

    McConnell, K John; Hoffman, Kim A; Quanbeck, Andrew; McCarty, Dennis

    2009-07-01

    Efforts to understand how to improve the delivery of substance abuse treatment have led to a recent call for studies on the "business of addiction treatment." This study adapts an innovative survey tool to collect baseline management practice data from 147 addiction treatment programs enrolled in the Network for the Improvement of Addiction Treatment 200 project. Measures of "good" management practice were strongly associated with days to treatment admission. Management practice scores were weakly associated with revenues per employee but were not correlated with operating margins. Better management practices were more prevalent among programs with a higher number of competitors in their catchment area.

  9. Croatian radioactive waste management program: Current status

    International Nuclear Information System (INIS)

    Matanic, R.; Lebegner, J.

    2001-01-01

    Croatia has a responsibility to develop a radioactive waste management program partly due to co-ownership of Krsko nuclear power plant (Slovenia) and partly because of its own medical and industrial radioactive waste. The total amount of generated radioactive waste in Croatia is stored in temporary storages located at two national research institutes, while radioactive waste from Krsko remains in temporary storage on site. National power utility Hrvatska Elektroprivreda (HEP) and Hazardous Waste Management Agency (APO) coordinate the work regarding decommissioning, spent fuel management and low and intermediate level radioactive waste (LILRW) management in Croatia. Since the majority of work has been done in developing the LILRW management program, the paper focuses on this part of radioactive waste management. Issues of site selection, repository design, safety assessment and public acceptance are being discussed. A short description of the national radioactive waste management infrastructure has also been presented. (author)

  10. Program summary. Nuclear waste management and fuel cycle programs

    International Nuclear Information System (INIS)

    1982-07-01

    This Program Summary Document describes the US Department of Energy (DOE) Nuclear Waste Management and Fuel Cycle Programs. Particular emphasis is given to near-term, specifically Fiscal Year (FY) 1982, activities. The overall objective of these programs will be achieved by the demonstration of: (1) safe radioactive waste management practices for storage and disposal of high-level waste and (2) advanced technologies necessary to close the nuclear fuel cycle on a schedule which would assure a healthy future for the development of nuclear power in this country

  11. Low-level waste management program: technical program overview

    International Nuclear Information System (INIS)

    Lowrie, R.S.

    1981-01-01

    The mission of the technical program is to develop the technology component of the Department of Energy's Low-Level Waste Management Program and to manage research and development, demonstration, and documentation of the technical aspects of the program. Some of the major technology objectives are: develop and demonstrate techniques for waste generation reduction; develop and demonstrate waste treatment, handling and packaging techniques; develop and demonstrate the technology for greater confinement; and develop the technology for remedial action at existing sites. In addition there is the technology transfer objective which is to compile and issue a handbook documenting the technology for each of the above technology objectives

  12. EPRI Guide to Managing Nuclear Utility Protective Clothing Programs

    International Nuclear Information System (INIS)

    Kelly, J.J.; Kelly, D.M.

    1993-10-01

    The Electric Power Research Institute (EPRI) commissioned a radioactive waste related project (RP2414-34) in 1989 to produce a guide for developing and managing nuclear plant protective clothing programs. Every nuclear facility must coordinate some type of protective clothing program for its radiation workers to ensure proper and safe protection for the wearer and to maintain control over the spread of contamination. Yet, every nuclear facility has developed its own unique program for managing such clothing. Accordingly, a need existed for a reference guide to assist with standardizing protective clothing programs and in controlling the potentially escalating economics of such programs. The initial Guide to Managing Nuclear Utility Protective Clothing Programs, NP-7309, was published in May 1991. Since that time, a number of utilities have reviewed and/or used the report to enhance their protective clothing programs. Some of these utilities requested that a computer program be developed to assist utilities in evaluating the economics of protective clothing programs consistent with the guidance in NP-7309. The PCEVAL computer code responds to that industry need. This report, the PCEVAL User's Manual, provides detailed instruction on use of the software

  13. Metra operations management development program : 2010 - 2015.

    Science.gov (United States)

    2016-11-04

    On behalf of the Urban Transportation Center, the University of Illinois (UIC) Great Cities Institute (GCI) provided curriculum development and training services to Metra for a workforce education program targeted to new and experienced managers. Met...

  14. Data warehousing in disease management programs.

    Science.gov (United States)

    Ramick, D C

    2001-01-01

    Disease management programs offer the benefits of lower disease occurrence, improved patient care, and lower healthcare costs. In such programs, the key mechanism used to identify individuals at risk for targeted diseases is the data warehouse. This article surveys recent warehousing techniques from HMOs to map out critical issues relating to the preparation, design, and implementation of a successful data warehouse. Discussions of scope, data cleansing, and storage management are included in depicting warehouse preparation and design; data implementation options are contrasted. Examples are provided of data warehouse execution in disease management programs that identify members with preexisting illnesses, as well as those exhibiting high-risk conditions. The proper deployment of successful data warehouses in disease management programs benefits both the organization and the member. Organizations benefit from decreased medical costs; members benefit through an improved quality of life through disease-specific care.

  15. Maintenance engineering of lifetime management programs

    International Nuclear Information System (INIS)

    Hervia Ruperez, F.

    1997-01-01

    The complexity of nuclear power plants obliges to stablish the adecuated management of its lifetime. This article describes the methodologies and the improvement the evaluation of lifetime programs and specially in Garona and Vandellos II Nuclear Power Plants. (Author)

  16. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  17. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  18. Economic value evaluation in disease management programs.

    Science.gov (United States)

    Magnezi, Racheli; Reicher, Sima; Shani, Mordechai

    2008-05-01

    Chronic disease management has been a rapidly growing entity in the 21st century as a strategy for managing chronic illnesses in large populations. However, experience has shown that disease management programs have not been able to demonstrate their financial value. The objectives of disease management programs are to create quality benchmarks, such as principles and guidelines, and to establish a uniform set of metrics and a standardized methodology for evaluating them. In order to illuminate the essence of disease management and its components, as well as the complexity and the problematic nature of performing economic calculations of their profitability and value, we collected data from several reports that dealt with the economic intervention of disease management programs. The disease management economic evaluation is composed of a series of steps, including the following major categories: data/information technology, information generation, assessment/recommendations, actionable customer plans, and program assessment/reassessment. We demonstrate the elements necessary for economic analysis. Disease management is one of the most innovative tools in the managed care environment and is still in the process of being defined. Therefore, objectives should include the creation of quality measures, such as principles and guidelines, and the establishment of a uniform set of metrics and a standardized methodology for evaluating them.

  19. One System for Blood Program Information Management

    Science.gov (United States)

    Gero, Michael G.; Klickstein, Judith S.; Hurst, Timm M.

    1980-01-01

    A system which integrates the diverse functions of a Blood Program within one structure is being assembled at the American National Red Cross Blood Services, Northeast Region. When finished, it will provide technical support for collection scheduling, donor recruitment, recordkeeping, laboratory processing, inventory management, HLA typing and matching, distribution, and administration within the Program. By linking these applications, a reporting structure useful to top management will be provided.

  20. Semantic Enhancement for Enterprise Data Management

    Science.gov (United States)

    Ma, Li; Sun, Xingzhi; Cao, Feng; Wang, Chen; Wang, Xiaoyuan; Kanellos, Nick; Wolfson, Dan; Pan, Yue

    Taking customer data as an example, the paper presents an approach to enhance the management of enterprise data by using Semantic Web technologies. Customer data is the most important kind of core business entity a company uses repeatedly across many business processes and systems, and customer data management (CDM) is becoming critical for enterprises because it keeps a single, complete and accurate record of customers across the enterprise. Existing CDM systems focus on integrating customer data from all customer-facing channels and front and back office systems through multiple interfaces, as well as publishing customer data to different applications. To make the effective use of the CDM system, this paper investigates semantic query and analysis over the integrated and centralized customer data, enabling automatic classification and relationship discovery. We have implemented these features over IBM Websphere Customer Center, and shown the prototype to our clients. We believe that our study and experiences are valuable for both Semantic Web community and data management community.

  1. Security-Enhanced Autonomous Network Management

    Science.gov (United States)

    Zeng, Hui

    2015-01-01

    Ensuring reliable communication in next-generation space networks requires a novel network management system to support greater levels of autonomy and greater awareness of the environment and assets. Intelligent Automation, Inc., has developed a security-enhanced autonomous network management (SEANM) approach for space networks through cross-layer negotiation and network monitoring, analysis, and adaptation. The underlying technology is bundle-based delay/disruption-tolerant networking (DTN). The SEANM scheme allows a system to adaptively reconfigure its network elements based on awareness of network conditions, policies, and mission requirements. Although SEANM is generically applicable to any radio network, for validation purposes it has been prototyped and evaluated on two specific networks: a commercial off-the-shelf hardware test-bed using Institute of Electrical Engineers (IEEE) 802.11 Wi-Fi devices and a military hardware test-bed using AN/PRC-154 Rifleman Radio platforms. Testing has demonstrated that SEANM provides autonomous network management resulting in reliable communications in delay/disruptive-prone environments.

  2. Environmental Management Science Program Workshop. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-07-01

    The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as that performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.

  3. Computer-Aided Corrosion Program Management

    Science.gov (United States)

    MacDowell, Louis

    2010-01-01

    This viewgraph presentation reviews Computer-Aided Corrosion Program Management at John F. Kennedy Space Center. The contents include: 1) Corrosion at the Kennedy Space Center (KSC); 2) Requirements and Objectives; 3) Program Description, Background and History; 4) Approach and Implementation; 5) Challenges; 6) Lessons Learned; 7) Successes and Benefits; and 8) Summary and Conclusions.

  4. Benchmarking Outdoor Expeditionary Program Risk Management Strategies

    Science.gov (United States)

    Meerts-Brandsma, Lisa; Furman, Nate; Sibthorp, Jim

    2017-01-01

    In 2003, the University of Utah and the National Outdoor Leadership School (NOLS) completed a study that developed a risk management taxonomy in the outdoor adventure industry and assessed how different outdoor expeditionary programs (OEPs) managed risk (Szolosi, Sibthorp, Paisley, & Gookin, 2003). By unifying the language around risk, the…

  5. Cryogenic fluid management program flight concept definition

    Science.gov (United States)

    Kroeger, Erich

    1987-01-01

    The Lewis Research Center's cryogenic fluid management program flight concept definition is presented in viewgraph form. Diagrams are given of the cryogenic fluid management subpallet and its configuration with the Delta launch vehicle. Information is given in outline form on feasibility studies, requirements definition, and flight experiments design.

  6. UNBC: Outdoor Recreation and Tourism Management Program

    Science.gov (United States)

    Maher, Pat

    2007-01-01

    This article describes the University of Northern British Columbia's (UNBC's) Outdoor Recreation and Tourism Management (ORTM) Program, which focuses squarely on the management of outdoor recreation as it relates to conservation (i.e., in and around parks and protected areas), tourism that is both based in and concerned with the natural/cultural…

  7. The Columbia University Management Program.

    Science.gov (United States)

    Yavarkovsky, Jerome; Haas, Warren J.

    In 1971, a management consulting firm undertook a case study of the Columbia University libraries to improve library performance by reviewing and strengthening the organization and recasting staff composition and deployment patterns. To implement the study's recommendations, an administrative structure was proposed which would emphasize functional…

  8. Marketing the Masters of Executive Management program

    OpenAIRE

    Barrera, Mark A.; Karriker, Timothy W.

    2007-01-01

    MBA Professional Report The purpose of this MBA project was to review the current Masters of Executive Management education curriculum at NPS. An internal analysis of the current program was conducted to fully understand the strategic goals of the program and the existing curriculum. An environmental scan of current and potential military customers was conducted to assess requirements for junior executive education and determine whether the MEM program corresponds with these requiremen...

  9. Subjective Experiences of Clients in a Voluntary Money Management Program.

    Science.gov (United States)

    Serowik, Kristin L; Bellamy, Chyrell D; Rowe, Michael; Rosen, Marc I

    2013-01-01

    A large proportion of people diagnosed with mental illnesses have difficulty managing their money, and therefore many psychiatric treatments involve providing money management assistance. However, little is known about the subjective experience of having a money manager, and extant literature is restricted to people forced to work with a representative payee or conservator. In this study, fifteen people were interviewed about their experience receiving a voluntary money management intervention designed to minimize substance use. Clients emphasized the importance of trusting the money manager, financial mindfulness (an enhanced awareness of the financial transactions in clients' day-to-day lives), agency over their own affairs, and addiction. In contrast to evaluations of people assigned representative payees and/or conservators, there was little mention of feeling coerced. These findings suggest that money management programs can address client concerns by building trust, relating budgeting to clients' day-to-day lives, and encouraging clients' control over their own affairs.

  10. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    International Nuclear Information System (INIS)

    Morrison, M.I.; McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D.

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections

  11. Environmental Restoration Program Control Management System

    International Nuclear Information System (INIS)

    Duke, R.T.

    1992-01-01

    Environmental Restoration managers need to demonstrate that their programs are under control. Unlike most industrial programs, the public is heavily involved in Environmental Restoration activities. The public is demanding that the country prove that real progress is being made towards cleaning up the environment. A Program Control Management System can fill this need. It provides a structure for planning, work authorization, data accumulation, data analysis and change control. But it takes time to implement a control system and the public is losing its patience. This paper describes critical items essential to the quick development and implementation of a successful control system

  12. Enhancing operability and reliability through configuration management

    International Nuclear Information System (INIS)

    Hancock, L.R.

    1993-01-01

    This paper describes the evolution of plant design control techniques from the early 1970's to today's operating environment that demands accurate, up-to-date design data. This evolution of design control is responsible for the increasingly troublesome scenario of design data being very difficult to locate and when found, its credibility is questioned. The design information could be suspect because there are discrepancies between two or more source documents or there is a difference between the design documents and the physical configuration of the plant. This paper discusses the impact these design control problems are having on plant operations and presents common sense solutions for improving configuration management techniques to ultimately enhance operability and reliability

  13. Sandia National Laboratories, California Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    2009-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia

  14. Sandia National Laboratories, California Environmental Management System program manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2012-03-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has

  15. Sandia National Laboratories, California Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2011-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories

  16. DOE Low-Level Waste Management Program

    International Nuclear Information System (INIS)

    Mezga, L.J.

    1983-01-01

    The Oak Ridge National Laboratory (ORNL) in its role as associate lead contractor of the DOE LLWMP has responsibility for the management of program-funded technology development activities. In this role with general guidance provided by DOE and the lead contractor (EG and G Idaho), the ORNL program office is charged with the responsibility to (1) develop program plans for the major technology areas, (2) recommend allocations for the program resources, (3) review the technology development tasks to ensure that program objectives are being met, and (4) to assist the lead contractor in coordinating the DOE LLWMP with other on-going US and foreign waste technology programs. Although the ORNL office generally assists the lead laboratory in management of the total program, our emphasis is on management of R and D for development of basic technology and to assess concepts for alternative systems of processing and disposal of LLW. Technical progress for each of the tasks of this program for FY 1982 is summarized

  17. Continuous Risk Management: A NASA Program Initiative

    Science.gov (United States)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  18. External tank program productivity and quality enhancements - A case study

    Science.gov (United States)

    Locke, S. R.

    1988-01-01

    The optimization of the Manned Space Systems productivity and quality enhancement program is described. The guidelines and standards of the program and the roles played in it by various employee groups are addressed. Aspects of the program involving job/organization redefinition, production and planning in automation, and artificial intelligence and robotics are examined.

  19. Continuation and Enhancement of the MPOWIR Program

    Energy Technology Data Exchange (ETDEWEB)

    Lozier, Susan [Duke Univ., Durham, NC (United States)

    2014-10-21

    MPOWIR is a community-based program that provides mentoring to physical oceanographers from late graduate school through early careers. The overall goal of MPOWIR is to make mentoring opportunities for junior physical oceanographers universally available and of higher quality by expanding the reach of mentoring opportunities beyond individual home institutions. The aim is to reduce the barriers to career development for all junior scientists in the field, with a particular focus on improving the retention of junior women. Over the past five years MPOWIR has expanded significantly. This funding cycle saw the development and enhancement of MPOWIR’s programs and outreach opportunities. MPOWIR’s main programmatic offerings are: mentor groups, a biannual conference, a website and blog, and town hall meetings at national events. Since 2009, MPOWIR has hosted 15 mentor groups, three Pattullo conferences, and created a website that has attracted over 50,000 visitors. MPOWIR’s mentoring groups and Pattullo conferences have reached more than 130 unique participants. Mentor Groups Mentor groups were established in the fall of 2008, and continue to gain momentum after 5 years. Since 2009, 11 groups have formed, with participants mainly, but not exclusively, drawn from Pattullo attendees. To gauge the impact of mentor groups, participants are surveyed approximately annually. Based on an extensive 2011 survey, 100% of mentoring group participants reported that they made progress on their stated scientific, professional, and personal goals. As part of these surveys, participants are asked what they value about their mentoring group, what the benefit of the mentoring group is to their current position, and they are asked questions about the logistics and setup of the groups. Based on the survey conducted in 2012, all participants rated participation in these groups a valuable experience, with particular value placed on feedback on professional development (100% Excellent to

  20. The Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Rummery, T.E.; Rosinger, E.L.J.

    1983-05-01

    The Canadian Nuclear Fuel Waste Management Program is now well established. This report outlines the generic research and technological development underway in this program to assess the concept of immobilization and subsequent disposal of nuclear fuel waste deep in a stable plutonic rock in the Canadian Shield. The program participants, funding, schedule and associated external review processes are briefly outlined. The major scientific and engineering components of the program, namely, immobilization studies, geoscience research and environmental and safety assessment, are described in more detail

  1. The Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Rummery, T.E.; Rosinger, E.L.J.

    1984-12-01

    The Canadian Nuclear Fuel Waste Management Program is in the fourth year of a ten-year generic research and development phase. The objective of this phase of the program is to assess the basic safety and environmental aspects of the concept of isolating immobilized fuel waste by deep underground disposal in plutonic rock. The major scientific and engineering components of the program, namely immobilization studies, geoscience research, and environmental and safety assessment, are described. Program funding, scheduling and associated external review processes are briefly outlined

  2. The Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Dixon, R.S.

    1984-12-01

    The Canadian Nuclear Fuel Waste Management Program involves research into the storage and transportation of used nuclear fuel, immobilization of fuel waste, and deep geological disposal of the immobilized waste. The program is now in the fourth year of a ten-year generic research and development phase. The objective of this phase of the program is to assess the safety and environmental aspects of the deep underground disposal of immobilized fuel waste in plutonic rock. The objectives of the research for each component of the program and the progress made to the end of 1983 are described in this report

  3. Using Technology to Enhance an Automotive Program

    Science.gov (United States)

    Ashton, Denis

    2009-01-01

    Denis Ashton uses technology in his automotive technology program at East Valley Institute of Technology (EVIT) to positively impact student outcomes. Ashton, the department chair for the automotive programs at EVIT, in Mesa, Arizona, says that using an interactive PowerPoint curriculum makes learning fun for students and provides immediate…

  4. In-House Energy Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    DOE facilities are required to develop a documented energy management program encompassing owned and leased facilities and vehicles and equipment. The program includes an Energy Management Plan consistent with the requirements of the DOE ten-year In-House Energy Management Plan, an ECP specifying actions associated with the sudden disruption in the supply of critical fuels, an Energy Management Committee comprised of WIPP employees, and reporting criteria for quarterly energy consumption reporting to DOE Headquarters. The In-House Energy Management Program will include an implementation plan, a budget, and an interaction and coordination plan. The goal of this program is to sensitize the WIPP employees to the energy consequences of their actions and to motivate them to use energy more efficiently. To achieve this goal, the program is designed to both improve energy conservation at the WIPP through the direct efforts of every employee, and to encourage employees to take the lead in conserving energy at home, on the road, and in the community

  5. Neuro-linguistic programming as a communication tool for management

    OpenAIRE

    2014-01-01

    M.Com. (Business Management) The outcome of the study was to explore the use of neuro linguistic programming as a communication tool that enhances communication in the workplace, and the results revealed that NLP business communications differ from the usual workplace communications. They involve communications that identify explicit and achievable outcomes, use sensory awareness to notice responses and flexibly alter behaviour to achieve outcomes. Participants were noticing and discoverin...

  6. 14 CFR 91.1411 - Continuous airworthiness maintenance program use by fractional ownership program manager.

    Science.gov (United States)

    2010-01-01

    ... program use by fractional ownership program manager. 91.1411 Section 91.1411 Aeronautics and Space FEDERAL... airworthiness maintenance program use by fractional ownership program manager. Fractional ownership program... through 91.1443. Any program manager who elects to maintain the program aircraft using a continuous...

  7. Transuranic waste management program waste form development

    International Nuclear Information System (INIS)

    Bennett, W.S.; Crisler, L.R.

    1981-01-01

    To ensure that all technology necessary for long term management of transuranic (TRU) wastes is available, the Department of Energy has established the Transuranic Waste Management Program. A principal focus of the program is development of waste forms that can accommodate the very diverse TRU waste inventory and meet geologic isolation criteria. The TRU Program is following two approaches. First, decontamination processes are being developed to allow removal of sufficient surface contamination to permit management of some of the waste as low level waste. The other approach is to develop processes which will allow immobilization by encapsulation of the solids or incorporate head end processes which will make the solids compatible with more typical waste form processes. The assessment of available data indicates that dewatered concretes, synthetic basalts, and borosilicate glass waste forms appear to be viable candidates for immobilization of large fractions of the TRU waste inventory in a geologic repository

  8. Sustainable Agriculture and Natural Resource Management Collaborative Research Support Program(SANREM CRSP)

    OpenAIRE

    Moore, Keith M.

    2007-01-01

    This presentation describes the history and current program of the Sustainable Agriculture and Natural Resource Management Collaborative Research Support Program (SANREM CRSP). SANREM Objectives include increasing stakeholder income generation capacity, empowering stakeholders, particularly women, enhancing decentralized resource management, strengthening local institutions, improving market access for smallholders and communities, and promoting sustainable and environmentally sound developme...

  9. The Marshall Islands Data Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Stoker, A.C.; Conrado, C.L.

    1995-09-01

    This report is a resource document of the methods and procedures used currently in the Data Management Program of the Marshall Islands Dose Assessment and Radioecology Project. Since 1973, over 60,000 environmental samples have been collected. Our program includes relational database design, programming and maintenance; sample and information management; sample tracking; quality control; and data entry, evaluation and reduction. The usefulness of scientific databases involves careful planning in order to fulfill the requirements of any large research program. Compilation of scientific results requires consolidation of information from several databases, and incorporation of new information as it is generated. The success in combining and organizing all radionuclide analysis, sample information and statistical results into a readily accessible form, is critical to our project.

  10. The Marshall Islands Data Management Program

    International Nuclear Information System (INIS)

    Stoker, A.C.; Conrado, C.L.

    1995-09-01

    This report is a resource document of the methods and procedures used currently in the Data Management Program of the Marshall Islands Dose Assessment and Radioecology Project. Since 1973, over 60,000 environmental samples have been collected. Our program includes relational database design, programming and maintenance; sample and information management; sample tracking; quality control; and data entry, evaluation and reduction. The usefulness of scientific databases involves careful planning in order to fulfill the requirements of any large research program. Compilation of scientific results requires consolidation of information from several databases, and incorporation of new information as it is generated. The success in combining and organizing all radionuclide analysis, sample information and statistical results into a readily accessible form, is critical to our project

  11. Savannah River waste management program plan

    International Nuclear Information System (INIS)

    1980-04-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River contractors for the Fiscal Year 1980. In addition, the document projects activities for several years beyond 1980 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes

  12. Hanford Site grundwater protection management program

    International Nuclear Information System (INIS)

    1989-10-01

    Groundwater protection has emerged over the past few years as a national priority that has been promulgated in a variety of environmental regulations at both the state and federal level. In order to effectively coordinate and ensure compliance with applicable regulations, the US Department of Energy (DOE) requires all DOE facilities to prepare separate groundwater protection program descriptions and plans (groundwater activities were formerly included as a subpart of environmental protection programs). This document is for the Hanford Site located in the state of Washington. The DOE Order specifies that the groundwater protection management program cover the following general topical areas: (1) documentation of the groundwater regime, (2) design and implementation of a groundwater monitoring program to support resource management and comply with applicable laws and regulations, (3) a management program for groundwater protection and remediation, (4) a summary and identification of areas that may be contaminated with hazardous waste, (5) strategies for controlling these sources, (6) a remedial action program, and (7) decontamination and decommissioning and related remedial action requirements. 14 refs., 19 figs., 2 tabs

  13. Pediatric CT quality management and improvement program

    Energy Technology Data Exchange (ETDEWEB)

    Larson, David B.; Chan, Frandics P.; Newman, Beverley; Fleischmann, Dominik [Stanford University School of Medicine, Department of Radiology, Stanford, CA (United States); Molvin, Lior Z. [Stanford Hospital and Clinics, Stanford, CA (United States); Wang, Jia [Stanford University, Environmental Health and Safety, Stanford, CA (United States)

    2014-10-15

    Modern CT is a powerful yet increasingly complex technology that continues to rapidly evolve; optimal clinical implementation as well as appropriate quality management and improvement in CT are challenging but attainable. This article outlines the organizational structure on which a CT quality management and improvement program can be built, followed by a discussion of common as well as pediatric-specific challenges. Organizational elements of a CT quality management and improvement program include the formulation of clear objectives; definition of the roles and responsibilities of key personnel; implementation of a technologist training, coaching and feedback program; and use of an efficient and accurate monitoring system. Key personnel and roles include a radiologist as the CT director, a qualified CT medical physicist, as well as technologists with specific responsibilities and adequate time dedicated to operation management, CT protocol management and CT technologist education. Common challenges in managing a clinical CT operation are related to the complexity of newly introduced technology, of training and communication and of performance monitoring. Challenges specific to pediatric patients include the importance of including patient size in protocol and dose considerations, a lower tolerance for error in these patients, and a smaller sample size from which to learn and improve. (orig.)

  14. Pediatric CT quality management and improvement program

    International Nuclear Information System (INIS)

    Larson, David B.; Chan, Frandics P.; Newman, Beverley; Fleischmann, Dominik; Molvin, Lior Z.; Wang, Jia

    2014-01-01

    Modern CT is a powerful yet increasingly complex technology that continues to rapidly evolve; optimal clinical implementation as well as appropriate quality management and improvement in CT are challenging but attainable. This article outlines the organizational structure on which a CT quality management and improvement program can be built, followed by a discussion of common as well as pediatric-specific challenges. Organizational elements of a CT quality management and improvement program include the formulation of clear objectives; definition of the roles and responsibilities of key personnel; implementation of a technologist training, coaching and feedback program; and use of an efficient and accurate monitoring system. Key personnel and roles include a radiologist as the CT director, a qualified CT medical physicist, as well as technologists with specific responsibilities and adequate time dedicated to operation management, CT protocol management and CT technologist education. Common challenges in managing a clinical CT operation are related to the complexity of newly introduced technology, of training and communication and of performance monitoring. Challenges specific to pediatric patients include the importance of including patient size in protocol and dose considerations, a lower tolerance for error in these patients, and a smaller sample size from which to learn and improve. (orig.)

  15. Defense Acquisitions: Department of Defense Actions on Program Manager Empowerment and Accountability

    National Research Council Canada - National Science Library

    2007-01-01

    .... In addition, as part of a new strategy for program manager empowerment and accountability, DOD plans a variety of actions to enhance development opportunities, provide more incentives, and arrange...

  16. Plant lifetime management and research program

    International Nuclear Information System (INIS)

    Sakai, K.; Nagayama, M.

    1993-01-01

    The importance of nuclear power generation has been increasing in Japan. Because the lower generation cost and more stable fuel supply, in comparison with the case of fossil plants, are beneficial to Japan which has scarce natural resources. In addition, nuclear power generation is expected to help reduce carbon dioxide emission which causes global warming. In these circumstances, the safe and stable operations of nuclear power plants are of prime importance, and the frequency of unscheduled shutdown has been kept low in Japan as a result of thorough periodic inspections supported by aging management. This paper covers the development process of the aging management program and related research programs in The Kansai Electric Power Co., Inc. (KEPCO). KEPCO runs 11 nuclear power units (PWR). A Table shows the commencement date of commercial operation and operating hours for each unit. The early plants, such as Mihama-2 Unit, have been operated for more than 100,000 hours and are in the phase of aging management. Accordingly, we have been conducting aging management programs since 1987. in order to identify age-related degradation and work out countermeasures.The aging management programs have ensured safe and stable operation of nuclear power plants. Each result of the lifetime assessment has provided the information which helps establishing maintenance programs. For example, the result of the lifetime assessment has been reflected to the intervals of overhaulings and inspections, and the replacement timing of some components. In the future activities of aging management should be revised and should focus lifetime assessment on components which provoke difficulties in inspections because of high radiation exposure or high inspection cost

  17. Enhancing Family Literacy through Collaboration: Program Considerations.

    Science.gov (United States)

    Tice, Carolyn J.

    2000-01-01

    Presents findings from a two-year evaluation of a family literacy program in rural Appalachian Ohio. Demonstrates positive results for both impact/outcome and process objectives. Highlights an extensive network of interpersonal and interagency relationships that maximized resources and supported families as they changed. Suggests the importance of…

  18. NPP Mochovce nuclear safety enhancement program

    International Nuclear Information System (INIS)

    Cech, J.; Baumester, P.

    1997-01-01

    Nuclear power plant Mochovce is currently under construction and an extensive nuclear safety enhancement programme is under way. The upgrading and modifications are based on IAEA documents and on those of the Nuclear Regulatory Authority of the Slovak Republic. Based on a contract concluded with Riskaudit from the CEC, safety examinations of the Mochovce design were performed. An extensive list of technical specifications of safety measures is given. (M.D.)

  19. 78 FR 7477 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2013-02-01

    ... in the Multistate Corridor Operations and Management Program authorized by the Safe, Accountable... projects to improve multimodal transportation system management and operations. This notice seeks... Multistate Corridor Operations and Management (MCOM) programs and projects. The purpose of these investments...

  20. Abstracts: NRC Waste Management Program reports

    Energy Technology Data Exchange (ETDEWEB)

    Heckman, R.A.; Minichino, C.

    1979-11-01

    This document consists of abstracts of all reports published by the Nuclear Regulatory Commission (NRC) Waste Management Program at Lawrence Livermore Laboratory (LLL). It will be updated at regular intervals. Reports are arranged in numerical order, within each category. Unless otherwise specified, authors are LLL scientists and engineers.

  1. Parents are Teachers: A Child Management Program.

    Science.gov (United States)

    Becker, Wesley C.

    This manual is designed to help parents apply reinforcement theory in managing their children. The program explains how parents can systematically use consequences to teach children in positive ways. Units include: When to Reinforce; How to Reinforce; Reinforcement and Punishment in Everyday Life; and Why Parents (and Teachers) Goof; the Criticism…

  2. Abstracts: NRC Waste Management Program reports

    International Nuclear Information System (INIS)

    Heckman, R.A.; Minichino, C.

    1979-11-01

    This document consists of abstracts of all reports published by the Nuclear Regulatory Commission (NRC) Waste Management Program at Lawrence Livermore Laboratory (LLL). It will be updated at regular intervals. Reports are arranged in numerical order, within each category. Unless otherwise specified, authors are LLL scientists and engineers

  3. The Canadian fuel waste management program

    International Nuclear Information System (INIS)

    McConnell, D.B.

    1986-04-01

    This report is the sixth in the series of annual reports on the research and development program for the safe management and disposal of Canada's nuclear fuel waste. The report summarizes progress in 1984 for the following activities: storage and transportation of used fuel, immobilization of nuclear fuel waste, geotechnical research, environmental research, and environmental and safety assessment. 186 refs

  4. Cash Management Program Reaps Financial Rewards.

    Science.gov (United States)

    Saylor, Joan Nesenkar

    1984-01-01

    Basic components of a New Jersey district's profitable cash management program include consolidating funds using a negotiated bank agreement, a short term investment policy, accurate flowcharts for precise planning, and revenue and expenditure analysis. Data collection and analysis and the alternative of using a bank service agreement are…

  5. When are enhanced relationship tax compliance programs mutually beneficial?

    NARCIS (Netherlands)

    De Simone, L.; Sansing, R.; Seidman, J.K.

    2013-01-01

    This study investigates the circumstances under which “enhanced relationship” tax-compliance programs are mutually beneficial to taxpayers and tax authorities, as well as how these benefits are shared. We develop a model of taxpayer and tax authority behavior inside and outside of an enhanced

  6. The Costs of an Enhanced Employee Assistance Program (EAP) Intervention.

    Science.gov (United States)

    French, Michael T.; Dunlap, Laura J.; Zarkin, Gary A.; Karuntzos, Georgia T.

    1998-01-01

    This study estimates the economic costs of an enhanced Employee Assistance Program (EAP) intervention at a large midwestern EAP that serves 90 worksites. Results specify developmental and implementation costs and provide benchmark cost estimated for other EAPs that may be considering enhanced services. (SLD)

  7. Sandia National Laboratories, California Waste Management Program annual report.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2010-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  8. Sandia National Laboratories, California Hazardous Materials Management Program annual report.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2011-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Hazardous Materials Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.

  9. 14 CFR 91.1003 - Management contract between owner and program manager.

    Science.gov (United States)

    2010-01-01

    ... program manager. 91.1003 Section 91.1003 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... RULES Fractional Ownership Operations § 91.1003 Management contract between owner and program manager. Each owner must have a contract with the program manager that— (a) Requires the program manager to...

  10. Enhanced Geothermal Systems (EGS) R&D Program

    Energy Technology Data Exchange (ETDEWEB)

    Entingh, Daniel J.

    1999-08-18

    The purpose of this workshop was to develop technical background facts necessary for planning continued research and development of Enhanced Geothermal Systems (EGS). EGS are geothermal reservoirs that require improvement of their permeability or fluid contents in order to achieve economic energy production. The initial focus of this R&D program is devising and testing means to extract additional economic energy from marginal volumes of hydrothermal reservoirs that are already producing commercial energy. By mid-1999, the evolution of the EGS R&D Program, begun in FY 1988 by the U.S. Department of Energy (DOE), reached the stage where considerable expertise had to be brought to bear on what technical goals should be pursued. The main purpose of this Workshop was to do that. The Workshop was sponsored by the Office of Geothermal Technologies of the Department of Energy. Its purpose and timing were endorsed by the EGS National Coordinating Committee, through which the EGS R&D Program receives guidance from members of the U.S. geothermal industry. Section 1.0 of this report documents the EGS R&D Program Review Session. There, managers and researchers described the goals and activities of the program. Recent experience with injection at The Geysers and analysis of downhole conditions at Dixie Valley highlighted this session. Section 2.0 contains a number of technical presentations that were invited or volunteered to illuminate important technical and economic facts and opportunities for research. The emphasis here was on fi.acture creation, detection, and analysis. Section 3.0 documents the initial general discussions of the participants. Important topics that emerged were: Specificity of defined projects, Optimizing cost effectiveness, Main technical areas to work on, Overlaps between EGS and Reservoir Technology R&D areas, Relationship of microseismic events to hydraulic fractures, and Defining criteria for prioritizing research thrusts. Sections 4.0 and 5.0 report

  11. 20 CFR 632.76 - Program management systems.

    Science.gov (United States)

    2010-04-01

    ... management and participant tracking systems in accordance with § 632.32 and § 632.77. The principal... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management systems. 632.76 Section... NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Program Design and Management § 632.76 Program...

  12. Research waste management program - An action proposal

    International Nuclear Information System (INIS)

    Costa Ramos, A.; Esposito, I.

    1997-01-01

    The Brazilian Nuclear Energy Commission planned prepared and established a Research Waste Management Program, started in 1996, in order to map, to analyze and to solve the common problems in the research field. The specific study done included a large number of academic institutions. The procedures, results and operational methodology used by the Team linked to the Program, in one of the research institutions studied where corrective actions were implemented to avoid unnecessary dose to the public, will be discussed in this article. (author)

  13. 76 FR 34541 - Child and Adult Care Food Program Improving Management and Program Integrity

    Science.gov (United States)

    2011-06-13

    ... 7 CFR Parts 210, 215, 220 et al. Child and Adult Care Food Program Improving Management and Program..., 220, 225, and 226 RIN 0584-AC24 Child and Adult Care Food Program Improving Management and Program... management and integrity in the Child and Adult Care Food Program (CACFP), at 67 FR 43447 (June 27, 2002) and...

  14. The Performance Enhancement Group Program: Integrating Sport Psychology and Rehabilitation

    Science.gov (United States)

    Granito, Vincent J.; Hogan, Jeffery B.; Varnum, Lisa K.

    1995-01-01

    In an effort to improve the psychological health of the athlete who has sustained an injury, the Performance Enhancement Group program for injured athletes was created. This paper will offer a model for the Performance Enhancement Group program as a way to: 1) support the athlete, both mentally and physically; 2) deal with the demands of rehabilitation; and 3) facilitate the adjustments the athlete has to make while being out of the competitive arena. The program consists of responsibilities for professionals in sport psychology (ie, assessment/orientation, support, education, individual counseling, and evaluation) and athletic training (ie, organization/administration, recruitment and screening, support, application of techniques, and program compliance). The paper will emphasize that the success of the program is dependent on collaboration between professionals at all levels. PMID:16558357

  15. Health risk assessment for program managers

    International Nuclear Information System (INIS)

    Jump, R.A.; Williamson, D.S.

    1994-01-01

    This paper presents the findings of a sensitivity analysis into the independent variables that determine the levels of health risks posed by buried plutonium and americium at a typical contaminated site in an arid region. Environmental Restoration Program Managers often must make decisions concerning cleanup levels, remediation alternatives, schedules, cost estimates, etc. based upon extraordinarily safe assumptions about risk assessment calculation inputs. This study reveals to the Program Manager which variables are major drivers to the calculated levels of risk posed by transuranic radionuclides and which ones have second order effects or less. The findings of this study should indicate which inputs should be the focus of attention during negotiations with regulators and of further empirical investigation

  16. The Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Dixon, R.S.; Rosinger, E.L.J.

    1984-04-01

    This report, the fifth of a series of annual reports, reviews the progress that has been made in the research and development program for the safe management and disposal of Canada's nuclear fuel waste. The report summarizes activities over the past year in the following areas: public interaction; used fuel storage and transportation; immobilization of used fuel and fuel recycle waste; geoscience research related to deep underground disposal; environmental research; and environmental and safety assessment

  17. Waste management in Canadian nuclear programs

    International Nuclear Information System (INIS)

    Dyne, P.J.

    The objectives of the Canadian radioactive waste management program are described. Recycling actinides through reactors is being studied. Low and medium level waste treatments such as reverse osmosis concentration, immobilization in bitumen and plastics, and incineration are under study. Spent fuel can be stored dry in concrete canisters above ground and ultimate storage of wastes in salt deposits or hard rock is appropriate to Canadian conditions. (E.C.B.)

  18. Enterprise risk management: A process for enhanced management and improved performance

    OpenAIRE

    Gates , Stephen; Nicolas , Jean-Louis; Walker , Paul L.

    2012-01-01

    Some company boards of directors and management teams are still reluctant to embrace enterprise risk management (ERM) because of the uncertainty regarding its value to the bottom line. A survey of audit and risk management executives suggests that the use of ERM leads to increased management consensus, better-informed decisions, enhanced communication of risk taking, and greater management accountability.

  19. 1998 Environmental Management Science Program Annual Report

    International Nuclear Information System (INIS)

    1999-01-01

    The Environmental Management Science Program (EMSP) is a collaborative partnership between the DOE Office of Environmental Management (EM), Office of Science (DOE-SC), and the Idaho Operations Office (DOE-ID) to sponsor basic environmental and waste management related research. Results are expected to lead to reduction of the costs, schedule, and risks associated with cleaning up the nation's nuclear complex. The EMSP research portfolio addresses the most challenging technical problems of the EM program related to high level waste, spent nuclear fuel, mixed waste, nuclear materials, remedial action, decontamination and decommissioning, and health, ecology, or risk. The EMSP was established in response to a mandate from Congress in the fiscal year 1996 Energy and Water Development Appropriations Act. Congress directed the Department to ''provide sufficient attention and resources to longer-term basic science research which needs to be done to ultimately reduce cleanup costs, develop a program that takes advantage of laboratory and university expertise, and seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective''. This mandate followed similar recommendations from the Galvin Commission to the Secretary of Energy Advisory Board. The EMSP also responds to needs identified by National Academy of Sciences experts, regulators, citizen advisory groups, and other stakeholders

  20. Deploying Content Management System to enhance State ...

    African Journals Online (AJOL)

    CMS provides a collection of procedures used to manage workflow in a collaborative environment and permits a full-site search engine. In this paper we have designed a new e-governance model that uses the tool of CMS to guarantee free flow of government information. KEYWORDS: Content Management, E-governance, ...

  1. Fisheries and Oceans Canada - habitat management program in Ontario

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    On May 5, 2011, the Ontario Waterpower Association hosted the emergent hydro workshop in Peterborough. In the course of the workshop, Fisheries and Oceans Canada presented the habitat management program in Ontario. Fisheries and Oceans Canada explained that their role is to protect water resources. The Fisheries Act was passed to manage fisheries and fish habitats in Canada and to protect them from harmful alteration, disruption or destruction. The policy for the management of fish was written to interpret the Fisheries Act and enhance the productive capacity of fish habitats. In addition, two other Acts were passed, the Species at Risk Act and the Canadian Environmental Assessment Act, designed to protect species from extinction and improve coordination of, and public access to EA information. This presentation highlighted the different existing policies aimed at protecting fisheries and fish habitats in Canada.

  2. Transuranic waste management program and facilities

    International Nuclear Information System (INIS)

    Clements, T.L. Jr.; Cook, L.A.; Stallman, R.M.; Hunter, E.K.

    1986-01-01

    Since 1954, defense-generated transuranic (TRU) waste has been received at the Radioactive Waste Management Complex (RWMC) at the Idaho National Engineering Laboratory (INEL). Prior to 1970, approximately 2.2 million cubic feet of transuranic waste were buried in shallow-land trenches and pits at the RWMC. Since 1970, an additional 2.1 million cubic feet of waste have been retrievably stored in aboveground engineered confinement. A major objective of the Department of Energy (DOE) Nuclear Waste Management Program is the proper management of defense-generated transuranic waste. Strategies have been developed for managing INEL stored and buried transuranic waste. These strategies have been incorporated in the Defense Waste Management Plan and are currently being implemented with logistical coordination of transportation systems and schedules for the Waste Isolation Pilot Plant (WIPP). The Stored Waste Examination Pilot Plant (SWEPP) is providing nondestructive examination and assay of retrievably stored, contact-handled TRU waste. Construction of the Process Experimental Pilot Plant (PREPP) was recently completed, and PREPP is currently undergoing system checkout. The PRFPP will provide processing capabilities for contact-handled waste not meeting WIPP-Waste Acceptance Criteria (WAC). In addition, ongoing studies and technology development efforts for managing the TRU waste such as remote-handled and buried TRU waste, are being conducted

  3. Transuranic Waste Management Program and Facilities

    International Nuclear Information System (INIS)

    Clements, T.L. Jr.; Cook, L.A.; Stallman, R.M.; Hunter, E.K.

    1986-02-01

    Since 1954, defense-generated transuranic (TRU) waste has been received at the Radioactive Waste Management Complex (RWMC) at the Idaho National Engineering Laboratory (INEL). Prior to 1970, approximately 2.2 million cubic feet of transuranic waste were buried in shallow-land trenches and pits at the RWMC. Since 1970, an additional 2.1 million cubic feet of waste have been retrievably stored in aboveground engineered confinement. A major objective of the Department of Energy (DOE) Nuclear Waste Management Program is the proper management of defense-generated transuranic waste. Strategies have been developed for managing INEL stored and buried transuranic waste. These strategies have been incorporated in the Defense Waste Management Plan and are currently being implemented with logistical coordination of transportation systems and schedules for the Waste Isolation Pilot Plant (WIPP). The Stored Waste Examination Pilot Plant (SWEPP) is providing nondestructive examination and assay of retrievably stored, contact-handled TRU waste. Construction of the Process Experimental Pilot Plant (PREPP) was recently completed, and PREPP is currently undergoing system checkout. The PREPP will provide processing capabilities for contact-handled waste not meeting WIPP-Waste Acceptance Criteria (WAC). In addition, ongoing studies and technology development efforts for managing the TRU waste such as remote-handled and buried TRU waste, are being conducted

  4. The NPP Isar comprehensive Aging Management Program

    International Nuclear Information System (INIS)

    Zander, Andre; Ertl, Stefan

    2012-01-01

    The majority of System, Structure and Components (SSC) in a nuclear power plants are designed to experience a service life, which is far above the intended design life. In most cases, only a small percentage of SSCs are subject to significant aging effects, which may affect the integrity or the function of the component. The process of aging management (AM) has the objective to monitor and control degradation effects which may compromise safety functions of the plant. And furthermore, to ensure, that testing and maintenance programs sufficiently provide preventive measures to control degradation effects. Safety-related aspects and the targeted high availability of the power plant as well as the requirements stipulated by German regulatory authorities prompted the operator of NPP ISAR to introduce an aging surveillance program. The NPP Isar as well as the German NPPs has to be following in the scope of aging management the KTA 1403 guideline. The NPP Isar surveillance program based on the KTA 1403 guideline covers the following aspects: - Scoping and screening of safety relevant Systems, Structures and Components (SSC); - Identification of possible degradation mechanisms for safety relevant SSC; - Ensure, that testing and maintenance programs sufficiently provide preventive measures to control degradation effects; - Transferability check of industry experience (internal and external events); - Annual preparation of an AM status report. (author)

  5. Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management

    International Nuclear Information System (INIS)

    1993-11-01

    This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities in the operational phase. Portions of this standard are also useful for other DOE processes, activities, and programs. This Part 1 contains foreword, glossary, acronyms, bibliography, and Chapter 1 on operational configuration management program principles. Appendices are included on configuration management program interfaces, and background material and concepts for operational configuration management

  6. Addressing hospital-acquired pressure ulcers: patient care managers enhancing outcomes at the point of service.

    Science.gov (United States)

    Frumenti, Jeanine M; Kurtz, Abby

    2014-01-01

    An innovative leadership training program for patient care managers (PCMs) aimed at improving the management of operational failures was conducted at a large metropolitan hospital center. The program focused on developing and enhancing the transformational leadership skills of PCMs by improving their ability to manage operational failures in general and, in this case, hospital-acquired pressure ulcers. The PCMs received 8 weeks of intense training using the Toyota Production System process improvement approach, along with executive coaching. Compared with the control group, the gains made by the intervention group were statistically significant.

  7. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  8. University Program Management Information System: NASA's University Program Active Projects

    Science.gov (United States)

    Gans, Gary (Technical Monitor)

    2003-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Office of Education/N.

  9. Deploying Content Management System to enhance State ...

    African Journals Online (AJOL)

    PROF. O. E. OSUAGWU

    2013-09-01

    Sep 1, 2013 ... Abstract. Governments across developing countries worldwide have the ... KEYWORDS: Content Management, E-governance, Model, Search engine, ICT. ..... Benchmarking E-government (2002): A Global Perspective, United.

  10. Enhanced surveillance program FY97 accomplishments. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    Mauzy, A. [ed.; Laake, B. [comp.

    1997-10-01

    This annual report is one volume of the Enhanced Surveillance Program (ESP) FY97 Accomplishments. The complete accomplishments report consists of 11 volumes. Volume 1 includes an ESP overview and a summary of selected unclassified FY97 program highlights. Volume 1 specifically targets a general audience, reflecting about half of the tasks conducted in FY97 and emphasizing key program accomplishments and contributions. The remaining volumes of the accomplishments report are classified, organized by program focus area, and present in technical detail the progress achieved in each of the 104 FY97 program tasks. Focus areas are as follows: pits; high explosives; organics; dynamics; diagnostics; systems; secondaries; nonnuclear materials; nonnuclear components; and Surveillance Test Program upgrades.

  11. Program Management Challenges in a Joint Service Environment

    National Research Council Canada - National Science Library

    Taneyhill, Dorothy E

    2007-01-01

    ... or modifications of the same design. The Interim Defense Acquisition Guidebook defines a Joint Program Management Office as any defense acquisition system, subsystem, component, or technology program that involves formal management...

  12. NASA University Program Management Information System

    Science.gov (United States)

    1999-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. (See the bar chart on the next page). This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  13. Precise tillage systems for enhanced non-chemical weed management

    NARCIS (Netherlands)

    Kurstjens, D.A.G.

    2007-01-01

    Soil and residue manipulation can assist weed management by killing weeds mechanically, interfering in weed lifecycles, facilitating operations and enhancing crop establishment and growth. Current tillage systems often compromise these functions, resulting in heavy reliance on herbicides,

  14. SDDOT'S enhanced pavement management system : visual distress survey manual [2017

    Science.gov (United States)

    2017-05-11

    In 1993, the South Dakota Department of Transportation initiated the Research Project SD93-14, Enhancement of South Dakotas Pavement Management System. As the Research Project progressed, it was determined that to better evaluate the condition of ...

  15. Using information management to implement a clinical resource management program.

    Science.gov (United States)

    Rosenstein, A H

    1997-12-01

    This article provides a consultant's account of a 250-bed community hospital's experience in implementing the Clinical Resource Management (CRM) program, a four-stage process of using information to identify opportunities for improvement, developing an effective resource management team, implementing process improvement activities, and measuring the impact on outcomes of care. CASE STUDY EXAMPLE--CONGESTIVE HEART FAILURE: The chair of the departments of internal medicine and family practice selected congestive heart failure for in-depth study. A task force focused on treatment and patient disposition in the emergency room (ER), where most of the nonelective admissions originated. A set of standardized ER orders was developed that emphasized rapid and effective diuresis through the initiation of a progressive diuretic dosing schedule directly linked to patient response. Factors critical to the success of the CRM program included allocating adequate time to promote and sell the value and importance of the program, as well as securing the support of both information systems and physicians. The main barriers to success involved limitations in the information system infrastructure and delays attributable to committee review. Short-term results from the CRM program were encouraging, with average lengths of stay reduced by 0.5 days and average costs of care reduced by 12% for the ten diagnoses studied with no adverse results. Nonstudy diagnoses showed no notable improvement. Recognizing the growing importance of information management not only for clinical decision support but for accommodating all the necessary internal and external reporting requirements will require a significant commitment and investment in technology and personnel resources.

  16. Configuration Management Program - a part of Integrated Management System

    International Nuclear Information System (INIS)

    Mancev, Bogomil; Yordanova, Vanja; Nenkova, Boyka

    2014-01-01

    the Integrated Management System. CM ensures that during the entire operational life of the plant the following requirements are met: · The basic design requirements of the plant are established, documented and maintained; · The physical structures, systems and components (SSCs) of the plant are in conformity with the design requirements; · The physical and functional characteristics of the plant are correctly incorporated in the operational and maintenance documentation, as well as in the documents for testing and training; · The changes in the design documentation are incorporated in the physical configuration and · the operative documentation; · The changes in the design are minimized by management process for review according to approved criteria. The purpose of this report is to try to clarify the place of configuration management program within the Integrated Management System of Kozloduy NPP and to present the computerized information system for organization of the operational activities (IS OOA) as a tool for effective management of the facility. (authors)

  17. NASA University Program Management Information System

    Science.gov (United States)

    2000-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA:s objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA:s Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.* This report was prepared by the Education Division/FE, Office of Human Resources and Education, using a management information system which was modernized during FY 1993.

  18. Understanding science teacher enhancement programs: Essential components and a model

    Science.gov (United States)

    Spiegel, Samuel Albert

    Researchers and practioners alike recognize that "the national goal that every child in the United States has access to high-quality school education in science and mathematics cannot be realized without the availability of effective professional development of teachers" (Hewson, 1997, p. 16). Further, there is a plethora of reports calling for the improvement of professional development efforts (Guskey & Huberman, 1995; Kyle, 1995; Loucks-Horsley, Hewson, Love, & Stiles, 1997). In this study I analyze a successful 3-year teacher enhancement program, one form of professional development, to: (1) identify essential components of an effective teacher enhancement program; and (2) create a model to identify and articulate the critical issues in designing, implementing, and evaluating teacher enhancement programs. Five primary sources of information were converted into data: (1) exit questionnaires, (2) exit surveys, (3) exit interview transcripts, (4) focus group transcripts, and (5) other artifacts. Additionally, a focus group was used to conduct member checks. Data were analyzed in an iterative process which led to the development of the list of essential components. The Components are categorized by three organizers: Structure (e.g., science research experience, a mediator throughout the program), Context (e.g., intensity, collaboration), and Participant Interpretation (e.g., perceived to be "safe" to examine personal beliefs and practices, actively engaged). The model is based on: (1) a 4-year study of a successful teacher enhancement program; (2) an analysis of professional development efforts reported in the literature; and (3) reflective discussions with implementors, evaluators, and participants of professional development programs. The model consists of three perspectives, cognitive, symbolic interaction, and organizational, representing different viewpoints from which to consider issues relevant to the success of a teacher enhancement program. These

  19. 76 FR 18780 - Integrated Water Resource Management Plan, Yakima River Basin Water Enhancement Project, Benton...

    Science.gov (United States)

    2011-04-05

    ... storage control); 5. Fish Habitat (mainstem floodplain restoration program); 6. Enhanced Water Conservation (agricultural water and municipal/ domestic conservation); and 7. Market-Based Reallocation of... water conservation/water acquisition activities, tributary fish screens, and long-term management needs...

  20. A generic hazardous waste management training program

    International Nuclear Information System (INIS)

    Carter, R.J.; Karnofsky, B.

    1988-01-01

    The main purpose of this training program element is to familiarize personnel involved in hazardous waste management with the goals of RCRA and how they are to be achieved. These goals include: to protect health and the environment; to conserve valuable material and energy resources; to prohibit future open dumping on the land; to assure that hazardous waste management practices are conducted in a manner which protects human health and the environment; to insure that hazardous waste is properly managed thereby reducing the need for corrective actions in the future; to establish a national policy to reduce or eliminate the generation of hazardous waste, wherever feasible. Another objective of this progam element is to present a brief overview of the RCRA regulations and how they are implemented/enforced by the Environmental Protection Agency (EPA) and each of the fifty states. This element also discusses where the RCRA regulations are published and how they are updated. In addition it details who is responsible for compliance with the regulations. Finally, this part of the training program provides an overview of the activities and materials that are regulated. 1 ref

  1. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  2. Innovations in information management to enhance agriculture: A research perspective

    Science.gov (United States)

    Information management should be the cornerstone for innovative agricultural systems; however, the challenge remains on how to utilize all of the components to enhance agriculture. The enhancement of agriculture is often considered from only a yield perspective. This is an important factor and effo...

  3. Emergency management: Concepts and strategies for effective programs

    OpenAIRE

    Lucus, Valerie

    2007-01-01

    Review of Emergency Management: Concepts and Strategies for Effective Programs By Lucien G. Canton, CEM. By taking a different perspective on local government emergency management programs, this book presents the vision for a very different model--one that includes an independent emergency manager leading an enterprise-wide program focused on strategies that promote disaster resilient communities.

  4. Measuring Satisfaction in the Program Manager, Procuring Contracting Officer Relationship

    Science.gov (United States)

    1997-12-01

    Contracting Officer) and one of her customers (a U. S. Navy Program Manager ). From an examination of this relationship , the most appropriate criteria... Customer Satisfaction, Performance Measurement, Metrics, Contracting, Program Management 17. SECURITY CLASSIFICATION OF REPORT Unclassified...methodology for developing an instrument to measure the satisfaction of their customers , Navy Program Managers . The purpose of this thesis was to develop

  5. 76 FR 42536 - Real-Time System Management Information Program

    Science.gov (United States)

    2011-07-19

    ...-Time System Management Information Program AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... Real-Time System Management Information Program and general information about current and planned... establishing requirements for the Real-Time System Management Information Program on November 8, 2010, at 75 FR...

  6. 75 FR 68418 - Real-Time System Management Information Program

    Science.gov (United States)

    2010-11-08

    ...-Time System Management Information Program AGENCY: Federal Highway Administration (FHWA), DOT. ACTION...) to establish a Real-Time System Management Information Program that provides, in all States, the... traveler information. The purposes of the Real-Time System Management Information Program are to: (1...

  7. Research of the Rio Grande Ecosystem Management Program

    Science.gov (United States)

    Deborah M. Finch

    2000-01-01

    This paper describes the mission, objectives, and preliminary results of the Middle Rio Grande Ecosystem Management Research Program managed at the Rocky Mountain Research Station's Albuquerque laboratory. This program was initiated in 1994 to address growing pressures to effectively manage the limited resources of the middle Rio Grande Basin. The program is...

  8. School Age Center Connections: Site-Based Management Strategies for Implementation of Quality Programs.

    Science.gov (United States)

    Willis, Dahna R.

    This paper describes the outcomes of a practicum that initiated site-based-management strategies to support the consistent implementation of a quality school-age child-care program. Implemented at a multisite child-care center, the program sought to enhance staff members' job satisfaction and maximize their opportunities for professional growth…

  9. Outcomes From an Enhanced Recovery Program for Laparoscopic Gastric Surgery

    DEFF Research Database (Denmark)

    Wong-Chong, Nathalie; Kehlet, Henrik; Grantcharov, Teodor P

    2016-01-01

    PURPOSE: To examine the outcomes from an enhanced recovery after surgery (ERAS) program for laparoscopic gastric surgery. MATERIALS AND METHODS: This was a prospective study of patients undergoing elective laparoscopic gastric resection in an ERAS protocol at a single institution between 2008 and...

  10. The Next Step in Educational Program Budgets and Information Resource Management: Integrated Data Structures.

    Science.gov (United States)

    Jackowski, Edward M.

    1988-01-01

    Discusses the role that information resource management (IRM) plays in educational program-oriented budgeting (POB), and presents a theoretical IRM model. Highlights include design considerations for integrated data systems; database management systems (DBMS); and how POB data can be integrated to enhance its value and use within an educational…

  11. Managing reward strategy to enhance employee performance ...

    African Journals Online (AJOL)

    In a globalized economy with millions of businesses vying for talented workforce, an organization must be able to motivate and properly compensate ... that should be embedded in the organization's culture; management should identify employees' needs/preferences in developing organizations' compensation structure.

  12. Fact Sheet: Risk Management Plan (RMP) Audit Program

    Science.gov (United States)

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  13. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  14. 77 FR 8219 - Coastal Zone Management Program: Illinois

    Science.gov (United States)

    2012-02-14

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Coastal Zone Management... ICMP constitutes an approvable program and that requirements of the Coastal Zone Management Act (CZMA..., submitted a coastal management program to NOAA for approval under the Coastal Zone Management Act (CZMA), 16...

  15. 76 FR 57022 - Coastal Zone Management Program: Illinois

    Science.gov (United States)

    2011-09-15

    ... DEPARTMENT OF COMMERCE National Oceanic And Atmospheric Administration Coastal Zone Management Program: Illinois AGENCY: Office of Ocean and Coastal Resource Management (OCRM), National Oceanic and...: Illinois has submitted a coastal management program to NOAA for approval under the Coastal Zone Management...

  16. Configuration Management for eXtreme Programming

    DEFF Research Database (Denmark)

    Asklund, U.; Bendix, Lars Gotfred; Ekman, T.

    2003-01-01

    Extreme programming (XP) is a software development method that prescribes the use of 12 different practices. Four of these practices (collective code ownership, continuous integration, small releases and refactoring) can indeed be given good support by the use of simple configuration management (CM......) techniques. We report on our experience in providing many groups of novice developers with CM education, processes and tools to support the four CM-related XP practices in their projects. True to the spirit of XP both education and processes are very lightweight and we found that it was sufficient to focus...

  17. Mixed Waste Focus Area program management plan

    International Nuclear Information System (INIS)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal

  18. A Learning Management System Enhanced with Internet of Things Applications

    Science.gov (United States)

    Mershad, Khaleel; Wakim, Pilar

    2018-01-01

    A breakthrough in the development of online learning occurred with the utilization of Learning Management Systems (LMS) as a tool for creating, distributing, tracking, and managing various types of educational and training material. Since the appearance of the first LMS, major technological enhancements transformed this tool into a powerful…

  19. Learning Program for Enhancing Visual Literacy for Non-Design Students Using a CMS to Share Outcomes

    Science.gov (United States)

    Ariga, Taeko; Watanabe, Takashi; Otani, Toshio; Masuzawa, Toshimitsu

    2016-01-01

    This study proposes a basic learning program for enhancing visual literacy using an original Web content management system (Web CMS) to share students' outcomes in class as a blog post. It seeks to reinforce students' understanding and awareness of the design of visual content. The learning program described in this research focuses on to address…

  20. AECL's waste management and decommissioning program

    International Nuclear Information System (INIS)

    Kupferschmidt, W.C.H.

    2006-01-01

    Full text: Canada has developed significant expertise in radioactive waste management since the mid 1940s, when the Canadian nuclear program commenced activities at Chalk River Laboratories (CRL). Atomic Energy of Canada Limited (AECL), created as a Federal Crown Corporation in 1952, continues to manage wastes from these early days, as well as other radioactive wastes produced by Canadian hospitals, universities, industry, and operational wastes from AECL's current programs. AECL is also carrying out decommissioning of nuclear facilities and installations in Canada, predominantly at its own sites in Ontario (CRL, and the Douglas Point and Nuclear Power Demonstration prototype reactors), Manitoba (Whiteshell Laboratories) and Quebec (Gentilly-1 prototype reactor). At the CRL site, several major waste management enabling facilities are being developed to facilitate both the near- and long-term management of radioactive wastes. For example, the Liquid Waste Transfer and Storage Project is underway to recover and process highly radioactive liquid wastes, currently stored in underground tanks that, in some cases, date back to the initial operations of the site. This project will stabilize the wastes and place them in modern, monitored storage for subsequent solidification and disposal. Another initiative, the Fuel Packaging and Storage Project, has been initiated to recover and condition degraded used fuel that is currently stored in below-ground standpipes. The fuel will be then be stored in new facilities based on an adaptation of AECL's proven MACSTOR TM * dry storage system, originally designed for intermediate-term above-ground storage of used CANDU fuel bundles. Other commercial-based development work is underway to improve the storage density of the MACSTOR TM design, and to extend its application to interim storage of used LWR fuels as well as to the storage of intermediate-level radioactive waste arising from upcoming reactor refurbishment activities in Canada

  1. Basic elements of a risk management program

    International Nuclear Information System (INIS)

    Ericson, D.M. Jr.; Varnado, G.B.

    1991-01-01

    The modern industrial manger faces the challenge of safely and efficiently operating increasingly complex, sophisticated, and expensive plants in an atmosphere of reduced resources and increased competition, and frequently with heightened political and public oversight. These political and public concerns have become especially significant where the Federal Government regulates and/or funds programs that have a significant potential for adverse public safety or environmental impacts. Under these circumstances, a major accident or environmental insult could translate into major programmatic delay, redirection, or even plant closing. After-the-fact (reactive) resolution of safety and/or environment problems is both costly and time-consuming process. Therefore, it is prudent for managers at all levels to initiate aggressive proactive efforts to identify and control the risks (hazards) associated with their programs. Unfortunately, risk is not a concept with a single, universally accepted definition. It is most often represented as the product of the probability of occurrence of undesired events and the resultant consequences of those events. The consequences of concern may include: loss of human health, reduction in life expectancy, or loss of life; material or financial losses; environmental damage; or even societal disturbances. This paper discusses risk management and systems safety interest in which has intensified over the post decade principally because of public perceptions of the risks associated with nuclear power and the disposal of hazardous chemical wastes

  2. Now Enhancing Working Skills: The ``NEWS`` Program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Kuiper, A. [Merex Corp. (United States)

    1995-01-23

    In October of 1992, Los Alamos National Laboratory and Merex Corporation began a pilot basic skills program to enhance workers` skills. The program, known as the NEWS (Now Enhancing Working Skills) Program, was implemented by the Training and Development Group of the Human Resources Division. A group of 106 employees known as Radiological Control Technicians (RCTs) from ESH-1 (Environmental, Safety, and Health) were targeted to take mandated DOE (Department of Energy) training. The main goal of the LANL/Merex partnership was to help RCTs prepare for mandated DOE Rad Con training and job performance by improving their information processing and math skills. A second goal of this project was to use the information from this small group to make some predictions about the Laboratory as a whole. This final report contains the description and an appendix for the ``NEWS`` program. The topics in this report include Merex class descriptions, test score results for the MAT, the WAT, the TABE, and Challenge test, a follow-up survey to Merex IPS and math training, student feedback statistics for skills programs, and lessons learned from the program.

  3. High-level waste management technology program plan

    International Nuclear Information System (INIS)

    Harmon, H.D.

    1995-01-01

    The purpose of this plan is to document the integrated technology program plan for the Savannah River Site (SRS) High-Level Waste (HLW) Management System. The mission of the SRS HLW System is to receive and store SRS high-level wastes in a see and environmentally sound, and to convert these wastes into forms suitable for final disposal. These final disposal forms are borosilicate glass to be sent to the Federal Repository, Saltstone grout to be disposed of on site, and treated waste water to be released to the environment via a permitted outfall. Thus, the technology development activities described herein are those activities required to enable successful accomplishment of this mission. The technology program is based on specific needs of the SRS HLW System and organized following the systems engineering level 3 functions. Technology needs for each level 3 function are listed as reference, enhancements, and alternatives. Finally, FY-95 funding, deliverables, and schedules are s in Chapter IV with details on the specific tasks that are funded in FY-95 provided in Appendix A. The information in this report represents the vision of activities as defined at the beginning of the fiscal year. Depending on emergent issues, funding changes, and other factors, programs and milestones may be adjusted during the fiscal year. The FY-95 SRS HLW technology program strongly emphasizes startup support for the Defense Waste Processing Facility and In-Tank Precipitation. Closure of technical issues associated with these operations has been given highest priority. Consequently, efforts on longer term enhancements and alternatives are receiving minimal funding. However, High-Level Waste Management is committed to participation in the national Radioactive Waste Tank Remediation Technology Focus Area. 4 refs., 5 figs., 9 tabs

  4. High-level waste management technology program plan

    Energy Technology Data Exchange (ETDEWEB)

    Harmon, H.D.

    1995-01-01

    The purpose of this plan is to document the integrated technology program plan for the Savannah River Site (SRS) High-Level Waste (HLW) Management System. The mission of the SRS HLW System is to receive and store SRS high-level wastes in a see and environmentally sound, and to convert these wastes into forms suitable for final disposal. These final disposal forms are borosilicate glass to be sent to the Federal Repository, Saltstone grout to be disposed of on site, and treated waste water to be released to the environment via a permitted outfall. Thus, the technology development activities described herein are those activities required to enable successful accomplishment of this mission. The technology program is based on specific needs of the SRS HLW System and organized following the systems engineering level 3 functions. Technology needs for each level 3 function are listed as reference, enhancements, and alternatives. Finally, FY-95 funding, deliverables, and schedules are s in Chapter IV with details on the specific tasks that are funded in FY-95 provided in Appendix A. The information in this report represents the vision of activities as defined at the beginning of the fiscal year. Depending on emergent issues, funding changes, and other factors, programs and milestones may be adjusted during the fiscal year. The FY-95 SRS HLW technology program strongly emphasizes startup support for the Defense Waste Processing Facility and In-Tank Precipitation. Closure of technical issues associated with these operations has been given highest priority. Consequently, efforts on longer term enhancements and alternatives are receiving minimal funding. However, High-Level Waste Management is committed to participation in the national Radioactive Waste Tank Remediation Technology Focus Area. 4 refs., 5 figs., 9 tabs.

  5. Evaluation of demand-side management programs

    International Nuclear Information System (INIS)

    Kolbe, A.L.; O'Loughlin, M.P.

    1990-01-01

    Over the past few years, the attention accorded to demand-side management (DSM) measures has called into question the traditional cost minimization approach for evaluating such programs. Two broad approaches to DSM seem to be generally used: one examining the problem from multiple perspectives and the other including various practical methods used in-house by utility planners. Whatever the standard used to evaluate DSM, there remains at least one problem which cannot be quantified. The customers who participate in a DSM program cannot only take into account the effects of DSM on their electricity bills; their comfort can also be affected. This lowering of comfort constitutes a legitimate cost which can explain why some apparently sensible DSM measures are not adopted. A method is proposed to incorporate this cost. It establishes a way to evaluate DSM program tradeoffs that, from the perspective of standard economic theory, maximizes social welfare; explains why at least one of the perspectives in the multiple perspective approach needs to be modified to incorporate all customer costs; and outlines how the proposed standard can be implemented. 8 refs

  6. Regulatory Aspect of an Ageing Management Program

    International Nuclear Information System (INIS)

    Basic, I.; Zabric, I.; Savli, S.

    2006-01-01

    The aspects of plant ageing management (AM) gained increasing attention over the last ten years. Numerous technical studies have been performed to study the impact of ageing mechanisms on the safe and reliable operation of nuclear power plants. National research activities have been initiated or are in progress to provide the technical basis for decision making processes. The long-term operation of nuclear power plants is influenced by economic considerations, the socio-economic environment including public acceptance, developments in research and the regulatory framework, the availability of technical infrastructure to maintain and service the systems, structures and components as well as qualified personnel. Besides national activities there are a number of international activities in particular under the umbrella of the IAEA, the OECD and the EU. The paper will provide the summary on Nuclear Plant Life Management (PLIM) (or Ageing Management Program (AMP)) and Plant Life Extension (PLEX) development in USA and European countries. Also, insights from such effort currently performing in Slovenia will be discussed.(author)

  7. Enhancing policy to manage and minimise Australian greenhouse emissions

    International Nuclear Information System (INIS)

    Taplin, Ros

    2007-01-01

    Full text: The development of climate change policy in Australia is at an important stage in its evolution. Australia, as a ratifying nation of 1992 United Nations Framework Convention on Climate Change, has obligations as a party including development and implementation of national policy. In 2004, Australia announced a Climate Change Strategy updating the 1997 National Greenhouse Strategy which set out the framework for a coordinated and collaborative approach by all levels of government in Australia. The 2004 Climate Change Strategy is directed toward the achievement of three overarching goals: 'international engagement - pursuing an effective global response to climate change', 'emissions management...', and 'providing the foundations for Australia's climate change response...'. Despite not ratifying the Kyoto Protocol, Australia has committed to informally meet its 108% Kyoto Protocol target by taking on the role of an 'as if Party. Development and implementation a broad range of greenhouse gas emission reduction strategies, policies and programs, at the Commonwealth, state and territory, and local government levels, has occurred. Notably, the recent 2007-08 Australian Government Budget brought its total commitment to its climate change strategy to A$2.8 billion. Combined government action and industry investment in climate change mitigation via implementation of greenhouse gas emission reduction schemes are thus well underway. The Commonwealth's programs for greenhouse emission reduction are significant, and in particular, the Greenhouse Challenge Plus program certainly is a key industry motivator. Both state and local government actions have been drivers in policy development, supporting reduction of greenhouse emissions. Several states have implemented their own climate change strategies and the states have been proactive in their interest in emissions trading. Local councils' roles, in particular, have been and will increase in significance in the future

  8. Effective Strategies for Enhancing Waste Management at University Campuses

    Science.gov (United States)

    Ebrahimi, Kianoosh; North, Leslie A.

    2017-01-01

    Purpose: The purpose of this study is to identify and assess the waste management strategies that should be priorities for higher education institutions. The role of policy instruments (i.e. purchasing policies and recycling initiatives) in implementing sustainable zero-waste management programs at higher education institutions was investigated…

  9. Data Fusion for Enhanced Aircraft Engine Prognostics and Health Management

    Science.gov (United States)

    Volponi, Al

    2005-01-01

    Aircraft gas-turbine engine data is available from a variety of sources, including on-board sensor measurements, maintenance histories, and component models. An ultimate goal of Propulsion Health Management (PHM) is to maximize the amount of meaningful information that can be extracted from disparate data sources to obtain comprehensive diagnostic and prognostic knowledge regarding the health of the engine. Data fusion is the integration of data or information from multiple sources for the achievement of improved accuracy and more specific inferences than can be obtained from the use of a single sensor alone. The basic tenet underlying the data/ information fusion concept is to leverage all available information to enhance diagnostic visibility, increase diagnostic reliability and reduce the number of diagnostic false alarms. This report describes a basic PHM data fusion architecture being developed in alignment with the NASA C-17 PHM Flight Test program. The challenge of how to maximize the meaningful information extracted from disparate data sources to obtain enhanced diagnostic and prognostic information regarding the health and condition of the engine is the primary goal of this endeavor. To address this challenge, NASA Glenn Research Center, NASA Dryden Flight Research Center, and Pratt & Whitney have formed a team with several small innovative technology companies to plan and conduct a research project in the area of data fusion, as it applies to PHM. Methodologies being developed and evaluated have been drawn from a wide range of areas including artificial intelligence, pattern recognition, statistical estimation, and fuzzy logic. This report will provide a chronology and summary of the work accomplished under this research contract.

  10. Framework for assessing causality in disease management programs: principles.

    Science.gov (United States)

    Wilson, Thomas; MacDowell, Martin

    2003-01-01

    To credibly state that a disease management (DM) program "caused" a specific outcome it is required that metrics observed in the DM population be compared with metrics that would have been expected in the absence of a DM intervention. That requirement can be very difficult to achieve, and epidemiologists and others have developed guiding principles of causality by which credible estimates of DM impact can be made. This paper introduces those key principles. First, DM program metrics must be compared with metrics from a "reference population." This population should be "equivalent" to the DM intervention population on all factors that could independently impact the outcome. In addition, the metrics used in both groups should use the same defining criteria (ie, they must be "comparable" to each other). The degree to which these populations fulfill the "equivalent" assumption and metrics fulfill the "comparability" assumption should be stated. Second, when "equivalence" or "comparability" is not achieved, the DM managers should acknowledge this fact and, where possible, "control" for those factors that may impact the outcome(s). Finally, it is highly unlikely that one study will provide definitive proof of any specific DM program value for all time; thus, we strongly recommend that studies be ongoing, at multiple points in time, and at multiple sites, and, when observational study designs are employed, that more than one type of study design be utilized. Methodologically sophisticated studies that follow these "principles of causality" will greatly enhance the reputation of the important and growing efforts in DM.

  11. A meta-analysis of the effects of classroom management strategies and classroom management programs on students’ academic, behavioral, emotional, and motivational outcomes

    NARCIS (Netherlands)

    Korpershoek, Hanke; Harms, Truus; de Boer, Hester; van Kuijk, Mechteld; Doolaard, Simone

    This meta-analysis examined which classroom management strategies and programs enhanced students’ academic, behavioral, social-emotional, and motivational outcomes in primary education. The analysis included 54 random and nonrandom controlled intervention studies published in the past decade

  12. EM-31 Alternative and Enhanced Chemical Cleaning Program

    International Nuclear Information System (INIS)

    King, Bill

    2010-01-01

    King's introduction to his presentation made 5 important points: (1) Numerous SRS tanks scheduled for closure (contract commitments); (2) Cannot remove all sludge by mechanical means due to obstructions; (3) Chemical removal technology needed (likely oxalic acid); (4) Post - dissolution neutralization required prior to transfer to compliant tanks; (5) Sodium oxalate salts precipitate on neutralization and have negative downstream impacts. There were three SRS chemical cleaning programs in 2010: Baseline: 8wt percent OA batch contact, ECC: 1-3 wt. percent OA with oxalate destruction, and the Alternative/Enhanced Chemical Cleaning (EM-31). This talk is on the EM-31 program.

  13. Development and Implementation of a Program Management Maturity Model

    Energy Technology Data Exchange (ETDEWEB)

    Hartwig, Laura; Smith, Matt

    2008-12-15

    In 2006, Honeywell Federal Manufacturing & Technologies (FM&T) announced an updatedvision statement for the organization. The vision is “To be the most admired team within the NNSA [National Nuclear Security Administration] for our relentless drive to convert ideas into the highest quality products and services for National Security by applying the right technology, outstanding program management and best commercial practices.” The challenge to provide outstanding program management was taken up by the Program Management division and the Program Integration Office (PIO) of the company. This article describes how Honeywell developed and deployed a program management maturity model to drive toward excellence.

  14. Nuclear Waste Management Program summary document, FY 1981

    International Nuclear Information System (INIS)

    1980-03-01

    The Nuclear Waste Management Program Summary Document outlines the operational and research and development (R and D) activities of the Office of Nuclear Waste Management (NEW) under the Assistant Secretary for Nuclear Energy, US Department of Energy (DOE). This document focuses on the current and planned activities in waste management for FY 1981. This Program Summary Document (PSD) was prepared in order to explain the Federal nuclear waste management and spent fuel storage programs to Congress and its committees and to interested members of the public, the private sector, and the research community. The national energy policy as it applies to waste management and spent fuel storage is presented first. The program strategy, structure, budget, management approach, and public participation programs are then identified. The next section describes program activities and outlines their status. Finally, the applicability of departmental policies to NEW programs is summarized, including field and regional activities, commercialization plans, and environmental and socioeconomic implications of waste management activities, and international programs. This Nuclear Waste Management Program Summary Document is meant to serve as a guide to the progress of R and D and other energy technology programs in radioactive waste management. The R and D objective is to provide the Nation with acceptable solutions to short- and long-term management problems for all forms of radioactive waste and spent fuel

  15. Nuclear Waste Management Program summary document, FY 1981

    Energy Technology Data Exchange (ETDEWEB)

    Meyers, Sheldon

    1980-03-01

    The Nuclear Waste Management Program Summary Document outlines the operational and research and development (R and D) activities of the Office of Nuclear Waste Management (NEW) under the Assistant Secretary for Nuclear Energy, US Department of Energy (DOE). This document focuses on the current and planned activities in waste management for FY 1981. This Program Summary Document (PSD) was prepared in order to explain the Federal nuclear waste management and spent fuel storage programs to Congress and its committees and to interested members of the public, the private sector, and the research community. The national energy policy as it applies to waste management and spent fuel storage is presented first. The program strategy, structure, budget, management approach, and public participation programs are then identified. The next section describes program activities and outlines their status. Finally, the applicability of departmental policies to NEW programs is summarized, including field and regional activities, commercialization plans, and environmental and socioeconomic implications of waste management activities, and international programs. This Nuclear Waste Management Program Summary Document is meant to serve as a guide to the progress of R and D and other energy technology programs in radioactive waste management. The R and D objective is to provide the Nation with acceptable solutions to short- and long-term management problems for all forms of radioactive waste and spent fuel.

  16. SELF MANAGEMENT PROGRAM MENINGKATKAN KOPING, NIAT DAN KEPATUHAN BEROBAT PASIEN PJK SETELAH PEMBERIAN SELF MANAGEMENT PROGRAM

    Directory of Open Access Journals (Sweden)

    Hanim mufarokhah mufarokhah

    2016-04-01

    Full Text Available Introduction: Management coronary artery disease required lifelong treatment. The successful management of CHD requires efective coping, intention and medication adherence of CHD’s patients. This study aimed to explain the changes of coping, intention, and medication adherence in patients with CHD after giving self management programme in RSUD Jombang based on Theory Planned Behavior.Method: This study used a quasy experimental pretest-posttest control group design and 28 respondens selected by consecutive sampling. Independent variable was self management programme while dependent variables were coping, intention, medication adherence. Data were collected by using questonnaires measuring coping level, intention and medication adherence. The statistical test used was Mann Whitney, Wilcoxone Signed Rank and t-Test. Result: The result showed that 1 self management programme improve the level of coping in patients with CHD (p < 0,001, 2 self management programme improve the level of intention in patients with CHD (p < 0,001, 3 self management programme improve the level of medication adherence in patients with CHD (p < 0,001. Discussion: To change a behavior requires improvement of coping and intentions. This is in according to the Theory of Planned Behavior that behavior change is influenced by the attitude toward the behavior, subjective norm, perceived behavioral control and intention. Keywords: self management program, coping, intention, medication adherence, coronary heart disease

  17. Sandia National Laboratories, California Environmental Management System program manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2013-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  18. 76 FR 47296 - Transit Asset Management (TAM) Pilot Program Funds

    Science.gov (United States)

    2011-08-04

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Transit Asset Management (TAM) Pilot... supplemented by Bus Discretionary funds in support of the Transit Asset Management (TAM) Pilot Program, which was announced in the TAM Program Notice of Funding Availability on November 19, 2010. The TAM program...

  19. SNL/CA Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2005-09-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program was developed in accordance with Department of Energy (DOE) Order 450.1 and incorporates the elements of the International Standard on Environmental Management Systems, ISO 14001.

  20. Sandia National Laboratories, California Environmental Management System program manual

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2014-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  1. Electronic human resource management: Enhancing or entrancing?

    Directory of Open Access Journals (Sweden)

    Paul Poisat

    2017-07-01

    Full Text Available Orientation: This article provides an investigation into the current level of development of the body of knowledge related to electronic human resource management (e-HRM by means of a qualitative content analysis. Several aspects of e-HRM, namely definitions of e-HRM, the theoretical perspectives around e-HRM, the role of e-HRM, the various types of e-HRM and the requirements for successful e-HRM, are examined. Research purpose: The purpose of the article was to determine the status of e-HRM and examine the studies that report on the link between e-HRM and organisational productivity. Motivation for the study: e-HRM has the capacity to improve organisational efficiency and leverage the role of human resources (HR as a strategic business partner. Main findings: The notion that the implementation of e-HRM will lead to improved organisational productivity is commonly assumed; however, empirical evidence in this regard was found to be limited. Practical/managerial implications: From the results of this investigation it is evident that more research is required to gain a greater understanding of the influence of e-HRM on organisational productivity, as well as to develop measures for assessing this influence. Contribution: This article proposes additional areas to research and measure when investigating the effectiveness of e-HRM. It provides a different lens from which to view e-HRM assessment whilst keeping it within recognised HR measurement parameters (the HR value chain. In addition, it not only provides areas for measuring e-HRM’s influence but also provides important clues as to how the measurements may be approached.

  2. Competencies for Graduate Culinary Management Degree Programs: Stakeholders' Perspectives

    Science.gov (United States)

    George, Annette A.

    2009-01-01

    Available literature on graduate hospitality education was highly focused on required competencies for hospitality management degree programs but not on culinary management. One possible explanation is that the culinary sector still lags behind in the formation of graduate culinary management programs in the United States. This causal comparative…

  3. Using management action plans to integrate program improvement efforts

    Energy Technology Data Exchange (ETDEWEB)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N. [Project Performance Corporation, Sterling, VA (United States)

    1994-12-31

    The Department of Energy`s (DOE`s) Environmental Management Program is the country`s largest and most sophisticated environmental program to date. The rapid expansion of the DOE`s environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program`s management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities.

  4. 76 FR 65561 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-10-21

    ... participation in the Multistate Corridor Operations and Management (MCOM) Program authorized by the Safe... transportation system management and operations. This notice seeks applications for available fiscal year (FY... system management and operations. Since the MCOM program is funded by the DOT Intelligent Transportation...

  5. 78 FR 43962 - Meeting: RTCA Program Management Committee

    Science.gov (United States)

    2013-07-22

    ... Washington, DC, on June 28, 2013. Paige Williams, Management Analyst, NextGen, Business Operations Group... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Meeting: RTCA Program Management...: Notice of RTCA Program Management Committee Meeting. SUMMARY: The FAA is issuing this notice to advise...

  6. 18 CFR 357.5 - Cash management programs.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Cash management...: CARRIERS SUBJECT TO PART I OF THE INTERSTATE COMMERCE ACT § 357.5 Cash management programs. Oil pipeline... and § 357.2 of this title that participate in cash management programs must file these agreements with...

  7. 18 CFR 260.400 - Cash management programs.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Cash management... Cash management programs. Natural gas companies subject to the provisions of the Commission's Uniform... management programs must file these agreements with the Commission. The documentation establishing the cash...

  8. 18 CFR 141.500 - Cash management programs.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Cash management... OF 1978 STATEMENTS AND REPORTS (SCHEDULES) § 141.500 Cash management programs. Public utilities and... and § 141.1 or § 141.2 of this title that participate in cash management programs must file these...

  9. Do Loyalty Programs Enhance Behavioral Loyalty: An Empirical Analysis Accounting for Program Design and Competitive Effects

    OpenAIRE

    Leenheer, J.; Bijmolt, T.H.A.; van Heerde, H.J.; Smidts, A.

    2002-01-01

    This paper studies the effects of loyalty programs on share-of-wallet using market-wide household panel data on supermarket purchases.We find that loyalty programs relate positively to share-of-wallet, but the programs differ in effectiveness and some are ineffective.Both a saving component and a multi-vendor structure enhance the effectiveness of a loyalty program, but high discounts do not lead to higher share-of-wallets.Further, if households have multiple loyalty cards, the effectiveness ...

  10. Managing PBL difficulties in an industrial engineering and management program

    Directory of Open Access Journals (Sweden)

    Anabela Alves

    2016-08-01

    Full Text Available Purpose: Project-Based Learning (PBL is considered to be an active learning methodology which can be used to develop both technical and transversal competences in engineering programs. This methodology demands a great deal of work effort from the students and also from the teachers and it requires a meticulous plan and a well-managed project as well. These activities go far beyond the normal activities in traditional lectures, enabling to outpace the difficulties that spur along the way that may be both complex and demotivating. This methodology has been implemented in the Integrated Master Degree on Industrial Engineering and Management (IEM, at one public university in Portugal, since the 2004/2005 academic year. The aim of this paper is to identify and discuss the main difficulties of the implementation of PBL, mainly from the teachers’ perspectives. Additionally, some effective strategies will be recommended to overcome such difficulties. Design/methodology/approach: The perceptions of the teachers were collected through a survey based on six main themes. The participants in the study include eight teachers from the five courses of the first semester of the first year of the IEM program involved in the 2012/2013 and 2013/2014 editions. Findings: Integration of courses in the project; student assessment; growing number of students in each team and the need of physical spaces for them; and compartmentalized knowledge has emerged as the main difficulties. To overcome these difficulties some key strategies were recommended. Originality/value: A new perspective based on course teachers' views and experiences will deepen the understanding of the problems and provide inputs for the development of strategies that may improve the effectiveness of PBL and introduce changes for its successful implementation. These strategies are intended to be transferable to other contexts, as most of the problems and constraints are common to other active learning

  11. Managing PBL difficulties in an industrial engineering and management program

    International Nuclear Information System (INIS)

    Alves, A.; Sousa, R.; Moreira, F.; Carvalho, M.A.; Cardoso, E.; Pimenta, P.; Malheiro, T.; Brito, I.; Fernandes, S.; Mesquita, D.

    2016-01-01

    Project-Based Learning (PBL) is considered to be an active learning methodology which can be used to develop both technical and transversal competences in engineering programs. This methodology demands a great deal of work effort from the students and also from the teachers and it requires a meticulous plan and a well-managed project as well. These activities go far beyond the normal activities in traditional lectures, enabling to outpace the difficulties that spur along the way that may be both complex and demotivating. This methodology has been implemented in the Integrated Master Degree on Industrial Engineering and Management (IEM), at one public university in Portugal, since the 2004/2005 academic year. The aim of this paper is to identify and discuss the main difficulties of the implementation of PBL, mainly from the teachers’ perspectives. Additionally, some effective strategies will be recommended to overcome such difficulties. Design/methodology/approach: The perceptions of the teachers were collected through a survey based on six main themes. The participants in the study include eight teachers from the five courses of the first semester of the first year of the IEM program involved in the 2012/2013 and 2013/2014 editions. Findings: Integration of courses in the project; student assessment; growing number of students in each team and the need of physical spaces for them; and compartmentalized knowledge has emerged as the main difficulties. To overcome these difficulties some key strategies were recommended. Originality/value: A new perspective based on course teachers' views and experiences will deepen the understanding of the problems and provide inputs for the development of strategies that may improve the effectiveness of PBL and introduce changes for its successful implementation. These strategies are intended to be transferable to other contexts, as most of the problems and constraints are common to other active learning approaches. (Author)

  12. Managing PBL difficulties in an industrial engineering and management program

    Energy Technology Data Exchange (ETDEWEB)

    Alves, A.; Sousa, R.; Moreira, F.; Carvalho, M.A.; Cardoso, E.; Pimenta, P.; Malheiro, T.; Brito, I.; Fernandes, S.; Mesquita, D.

    2016-07-01

    Project-Based Learning (PBL) is considered to be an active learning methodology which can be used to develop both technical and transversal competences in engineering programs. This methodology demands a great deal of work effort from the students and also from the teachers and it requires a meticulous plan and a well-managed project as well. These activities go far beyond the normal activities in traditional lectures, enabling to outpace the difficulties that spur along the way that may be both complex and demotivating. This methodology has been implemented in the Integrated Master Degree on Industrial Engineering and Management (IEM), at one public university in Portugal, since the 2004/2005 academic year. The aim of this paper is to identify and discuss the main difficulties of the implementation of PBL, mainly from the teachers’ perspectives. Additionally, some effective strategies will be recommended to overcome such difficulties. Design/methodology/approach: The perceptions of the teachers were collected through a survey based on six main themes. The participants in the study include eight teachers from the five courses of the first semester of the first year of the IEM program involved in the 2012/2013 and 2013/2014 editions. Findings: Integration of courses in the project; student assessment; growing number of students in each team and the need of physical spaces for them; and compartmentalized knowledge has emerged as the main difficulties. To overcome these difficulties some key strategies were recommended. Originality/value: A new perspective based on course teachers' views and experiences will deepen the understanding of the problems and provide inputs for the development of strategies that may improve the effectiveness of PBL and introduce changes for its successful implementation. These strategies are intended to be transferable to other contexts, as most of the problems and constraints are common to other active learning approaches. (Author)

  13. A quality management program in intravascular brachytherapy

    International Nuclear Information System (INIS)

    Chakri, Abderrahim; Thomadsen, Bruce

    2002-01-01

    While simple, intravascular brachytherapy (IVB) presents a considerable potential for harm to the patient. The medical physicist maintains the responsibility to minimize the likelihood of operational problems or dosimetric errors. The principals for safe operation remain the same as with any radiotherapy treatment: to deliver the correct dose, to the correct location, safety. To develop an effective and comprehensive quality management (QM) program for IVB, a physicist should utilize proven risk assessment techniques rather than simply thinking of things to check, and follow guidances such as ISO9001:2000. The proposed QM program includes the following: Procedures designed to assure the safety of the patient: Identification of the patient; tests of the integrity and patency for the delivery catheter, operation of the source train, and patency of the catheter in the treatment position; a check for recovery preparations; and verification of source recovery. Procedures to assure positional accuracy of the treatment: Verification of the positioning the catheter in the artery and of the sources in the catheter. Procedures to assure dosimetry accuracy: Acceptance testing of the device, including verification of the source strength and uniformity, and of the treatment duration tables; verification of the treatment prescription and duration for each patient; and control measures that minimize the likelihood of errors removing the source at the correct time

  14. Public participation in UMTRA Project Program Management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    The U.S. Department of Energy (DOE) is cleaning up radioactive soil and ore residue from 24 inactive uranium processing sites under the Uranium Mill Tailings Remedial Action (UMTRA) Project. In early 1993, the DOE adopted new guidelines strongly encouraging public participation. This guidance commits to providing the public with opportunities to participate in the decision-making process for program planning, design, and implementation. Rooted in the conviction that an effective public participation program will enable citizens to take part in policy decisions, the full adoption of the guidance by the UMTRA project can also help DOE make better decisions, provide a means to build consensus, and assist in building credibility. This transition to open communication parallels the climate of corporate America in which increases in productivity are often the result of workers and management teaming together to solve problems. While these guidelines have been embraced by public affairs staff from headquarters to the field offices, barriers still exist that inhibit substantive public involvement. The challenge for the UMTRA project is to overcome these barriers to ensure that public participation is an integral part of the way business is conducted. This paper discusses lessons learned by the UMTRA project in its efforts to address barriers to public participation and the project's plans for full compliance with the DOE guidelines

  15. Thinned pipe management program of Korean NPPs

    International Nuclear Information System (INIS)

    Lee, S.H.; Kim, T.R.; Jeon, S.C.; Hwang, K.M.

    2003-01-01

    Wall thinning of carbon steel pipe components due to Flow-Accelerated Corrosion (FAC) is one of the most serious threats to the integrity of steam cycle systems in Nuclear Power Plants (NPP). If the thickness of a pipe component is reduced below the critical level, it cannot sustain stress and consequently results in leakage or rupture. In order to minimize the possibility of excessive wall thinning, Thinned Pipe Management Program (TPMP) has been set up and being implemented to all Korean NPPs. Important elements of the TPMP include the prediction of the FAC rate for each component based on model analysis, prioritization of pipe components for inspection, thickness measurement, calculation of wear and wear rate for each component. Additionally, decision making associated with replacement or continuous service for thinned pipe components and establishment of long-term strategic management plan based on diagnosis of plant condition regarding overall wall thinning also are essential part of the TPMP. From pre-service inspection data, it has been found that initial thickness is varies, which influences wear and wear rate calculations. (author)

  16. What is the role of a project or program manager in implementing and maintaining a quality assurance program

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The task of managing a government-funded program has changed significantly from the days when a program manager managed the funds and depended on reports from a contractor to measure the program's progress. Today's manager of waste management program must be personally involved in every aspect of the program. The successful manager of a waste management program will lead the development of management controls to ensure successful accomplishment of project objectives. This paper describes the responsibilities of the project manager, the quality assurance staff and how they interface to develop and implement a quality assurance program for a waste management program

  17. The Mount Sinai international enhancement of social work leadership program: The past and the future.

    Science.gov (United States)

    Gordon, Elisa; Green, Karen; Whitwam, Louisa; Epstein, Irwin; Bernstein, Susan

    2018-07-01

    Developed in 1988, the Mount Sinai International Enhancement of Social Work Leadership Program brings 4-6 social workers from several countries each year to the Mount Sinai Hospital in New York City, where they meet with leaders from the hospital, community based organizations and graduate schools of social work, to enhance their leadership ability, strengthen management and research skills, and build upon global social work relationships. This article reviews the results of a survey conducted in 2016 to assess whether the visiting scholars met established learning objectives of the Program. Survey outcomes, presented in quantitative and qualitative terms, show positive results, and the scholars reported that the Program was extremely beneficial. The Program is viewed through the lens of two select adult learning theories: Social Learning Theory, which incorporates collaboration and learning from others, and Transformative Learning Theory, which is comprised of self-reflection and individualized learning. The inclusion of these theories in the implementation of the Program will be discussed. An analysis of the survey's outcomes, through pre- and post-Program participation and learning, facilitates assessment of potential programmatic adjustments to help evaluate long-term viability of the Program and potential duplication by other academic medical centers.

  18. Let's get technical: Enhancing program evaluation through the use and integration of internet and mobile technologies.

    Science.gov (United States)

    Materia, Frank T; Miller, Elizabeth A; Runion, Megan C; Chesnut, Ryan P; Irvin, Jamie B; Richardson, Cameron B; Perkins, Daniel F

    2016-06-01

    Program evaluation has become increasingly important, and information on program performance often drives funding decisions. Technology use and integration can help ease the burdens associated with program evaluation by reducing the resources needed (e.g., time, money, staff) and increasing evaluation efficiency. This paper reviews how program evaluators, across disciplines, can apply internet and mobile technologies to key aspects of program evaluation, which consist of participant registration, participant tracking and retention, process evaluation (e.g., fidelity, assignment completion), and outcome evaluation (e.g., behavior change, knowledge gain). In addition, the paper focuses on the ease of use, relative cost, and fit with populations. An examination on how these tools can be integrated to enhance data collection and program evaluation is discussed. Important limitations of and considerations for technology integration, including the level of technical skill, cost needed to integrate various technologies, data management strategies, and ethical considerations, are highlighted. Lastly, a case study of technology use in an evaluation conducted by the Clearinghouse for Military Family Readiness at Penn State is presented and illustrates how technology integration can enhance program evaluation. Copyright © 2016 Elsevier Ltd. All rights reserved.

  19. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  20. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R ampersand D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER ampersand WM) operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER ampersand WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER ampersand WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs

  1. Capital Construction Fund Program :: Office of Management and Budget

    Science.gov (United States)

    Leaders Budget Policy Work for NOAA Fisheries Contact Us Programs Sustainable Fisheries Protected Regional Fishery Management Councils Congress Activities Budget Testimony Educators and Students Education Budget Home Appeals Division Budget FOIA Financial Services Saltonstall-Kennedy Grant Program Fisheries

  2. Cardiac Rehabilitation Enhancing Programs in Patients with Myocardial Infarction: A literature Review

    Directory of Open Access Journals (Sweden)

    Ahyana Ahyana

    2013-01-01

    Full Text Available Background: Cardiac rehabilitation (CR is a process that involves a multidisciplinary team of health professionals in order to optimize the status of patients’ physical, psychological, social, and vocational well being. The CR program has been proven to influence health outcomes in patients with cardiac diseases, particularly myocardial infarction (MI and stable angina. However, patients’ compliance with cardiac rehabilitation programs remains a challenge.Purpose: The purpose of this study is to review and identify interventions that enhance cardiac rehabilitation behaviors in MI patients.Method: A literature review was conducted by analyzing related research reports published since 2000 to 2012. Only English language articles were included.Result: There were 10 experimental studies and 2 meta-analysis studies. Interventions widely used to enhance cardiac rehabilitation behaviors in MI patients were self-efficacy and self management derived programs. These programs involved interventions that enhance cardiac rehabilitation behaviors, including training exercise, behavioral change, education and psychological support, and lifestyle changing strategies. None have reported the use of culturally tailored intervention. Four phases of cardiac rehabilitation were accepted as each phase represents a different aspect of care: inpatient care, early post discharge period, exercise training, and long term follow up. Critical factors for patients in maintaining an optimum health condition after a cardiac event are, in order, status of patient’s physical, psychological, social, and vocational well being.Conclusion: Cardiac Rehabilitation program has been shown to improve quality of life and decrease mortality in MI patients. The development of culturally specific interventions to increase cardiac rehabilitation behaviors will provide a significant improvement for cardiac patient’s care that ultimately results in better health outcomes. Health care

  3. Evaluating forest management policies by parametric linear programing

    Science.gov (United States)

    Daniel I. Navon; Richard J. McConnen

    1967-01-01

    An analytical and simulation technique, parametric linear programing explores alternative conditions and devises an optimal management plan for each condition. Its application in solving policy-decision problems in the management of forest lands is illustrated in an example.

  4. Introducing Knowledge Management in Study Program of Nuclear Engineering

    International Nuclear Information System (INIS)

    Pleslic, S.

    2012-01-01

    Nuclear engineering is the branch of engineering concerning application of the fission as well as the fusion of atomic nuclei, and the application of other sub-atomic physics, based on the principles of nuclear physics. In the sub-field of nuclear fission there are many investigations of interactions and maintaining of systems and components like nuclear reactors and nuclear power plants. The field also includes the study of different applications of ionizing radiation (medicine, agriculture...), nuclear safety, the problems of thermodynamics transport, nuclear materials and nuclear fuels, and other related technologies like radioactive waste management. In the area of nuclear science and engineering a big amount of knowledge has been accumulated over the last decades. Different levels of nuclear knowledge were considered in different ways and they were taught to different parts of population as a general human culture and as a general scientific-technical-technological culture (high schools, nuclear information centres, training centres, universities...). An advanced level of nuclear knowledge has been accumulated by many experienced workers, specialists and experts in all nuclear and nuclear-related fields and applications. In the last 20 years knowledge management has established itself as a discipline of enabling individuals, teams and whole organizations to create, share and apply knowledge collectively and systematically, with goal to better achieve their objectives. Also, knowledge management became key strategic approach for management of intellectual assets and knowledge that can improve safety, efficiency and innovation, and lead to preserve and enhance current knowledge. Knowledge management could be applied in education, training, networking, human resource development and capacity building, sharing, pooling and transferring knowledge form centres of knowledge to centres of growth. Considering the critical importance of nuclear knowledge it is important

  5. JAZELLE: An enhanced data management system for high energy physics

    International Nuclear Information System (INIS)

    Johnson, A.S.; Briedenbach, M.I.; Hissen, H.; Kunz, P.F.; Sherden, D.J.; Burnett, T.

    1990-01-01

    The data management system JAZELLE has been created as a successor to earlier HEP data managers such as YBOS and ZEBRA. While it has many similarities with these systems it also has many enhancements such as self-documenting data descriptions, mnemonic access to all data, relational data structures, powerful machine independent IO facilities including network IO, and many mechanisms for presenting data to the physicist in an inuitive manner. The emphasis has been on producing a powerful, user friendly, data management system which can be accessed from many languages as a natural extension of those languages

  6. Measuring Satisfaction in the Program Manager, Procuring Contracting Officer Relationship

    National Research Council Canada - National Science Library

    Gray, John

    1997-01-01

    .... To comply with this Executive Order, Navy contracting offices require an effective methodology for developing an instrument to measure the satisfaction of their customers, Navy Program Managers...

  7. Learning to Manage: A Program Just for Directors.

    Science.gov (United States)

    Thomas, Megan E.

    1996-01-01

    Describes the Head Start-Johnson & Johnson Management Fellows program, whose mission is strengthening management skills of Head Start directors by providing training in human resources management, organizational design and development, financial management, computers and information systems, operations, marketing, and development of strategic…

  8. Role Management in a Privacy-Enhanced Collaborative Environment

    Science.gov (United States)

    Lorenz, Anja; Borcea-Pfitzmann, Katrin

    2010-01-01

    Purpose: Facing the dilemma between collaboration and privacy is a continual challenge for users. In this setting, the purpose of this paper is to discuss issues of a highly flexible role management integrated in a privacy-enhanced collaborative environment (PECE). Design/methodology/approach: The general framework was provided by former findings…

  9. Supervision as a management variable that enhances availability of ...

    African Journals Online (AJOL)

    The purpose of this research was to investigate the management variable of supervision as it enhances availability of information sources in Nigerian university libraries. Four federal university libraries in the south-south zone of Nigeria were selected for the study. The population of the study consisted of all academic ...

  10. Employment Competence based Management to enhance Training Effectiveness

    NARCIS (Netherlands)

    Le Goff, Solenn; Ristol, Santi; Estévez, José Antonio

    2006-01-01

    Please, cite this publication as: Le Goff, S., Ristol, S., & Estévez, J.A. (2006). Employing Competence based Management to enhance Training Effectiveness. Proceedings of International Workshop in Learning Networks for Lifelong Competence Development, TENCompetence Conference. March 30th-31st,

  11. SNL/CA Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2007-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004. Elements of the ISO standard overlap with those of Department of Energy (DOE) Order 450.1, thus SNL/CA's EMS program also meets the DOE requirements.

  12. Implementation Plan for the Office of Nuclear Energy Knowledge Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Kimberlyn C. Mousseau

    2011-12-01

    The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

  13. Child Protection Program Implementations in Sport Management

    Directory of Open Access Journals (Sweden)

    Özgün PARASIZ

    2015-07-01

    Full Text Available The protection and provision of the welfare of children who are in a vulnerable condition to all kinds of risk in the modern world in every field they actively take part in is acknowledged as one of the most important social responsibilites of states in this day and age. In the fight against this problem, especially developed countries promote chi ld protection policies and implement them in every sport field children take active part in. The aim of this study is to examine in which dimensions child protection system, defined as the provision of the child’s safety in all aspects including physical, social, emotional, economic, cultural, ethnic, moral, religious and political on a legal basis and in practice, is implemented within the sport systems of England and to identify the policies of sports organizations. In the study, scanning method based o n the literature was used. Research data was obtained by examining the related sources on the subject in various international libraries, journals, books and sports organizations. According to the information obtained in the study, child protection progra ms were identified to be a legal obligation for independent sports organizations responsible for the management of the sport (such as Federations, Olympic committees, sport clubs. The fundamental purpose of child protection programs is to diminish the ris k of all kinds of (sexual, physical and emotional child abuse. Sports organization establish child protection systems within their governing structure and work in coordination with the related units of clubs, federations and central administrations. Moreo ver, by providing special trainings to administrators and coaches, the stipulation of obtaining a special document for coaches who shall work with sportsmen under the age of 18 has been laid down. Special regulations and educational programs for sport fede rations have been prepared intended for the functioning of child protection system in

  14. Disease management programs: barriers and benefits.

    Science.gov (United States)

    Magnezi, Racheli; Kaufman, Galit; Ziv, Arnona; Kalter-Leibovici, Ofra; Reuveni, Haim

    2013-04-01

    The healthcare system in Israel faces difficulties similar to those of most industrialized countries, including limited resources, a growing chronically ill population, and demand for high quality care. Disease management programs (DMPs) for patients with a chronic illness aim to alleviate some of these problems, primarily by improving patient self-management skills and quality of care. This study surveyed the opinions of senior healthcare administrators regarding barriers, benefits, and support for implementing DMPs. Cross-sectional survey. A 21-item questionnaire was self-completed by 87 of 105 (83%) healthcare administrators included in the study. Participants were 65.5% male and 47% physicians, 25.3% nurses, 17.3% administrators, and 10.3% other healthcare professionals. The main perceived benefit of DMPs among all respondents was improving quality of care. Other benefits noted were better contact with patients (81.6%) and better compliance with treatment (75.9%). Efficient long-term utilization of system resources was perceived as a benefit by only 58.6%. The main perceived barriers to implementing DMPs were lack of budgetary resources (69%) and increased time required versus financial compensation received (63.2%). The benefits of DMPs were patient oriented; barriers were perceived as financial and limiting professional autonomy. Information regarding long-term benefits (better patient outcomes) that ultimately provide better value for the system versus short-term barriers (increased costs and expenditures of time without compensation) might encourage the implementation of DMPs in countries faced with a growing population of patients with at least 1 chronic illness.

  15. Enhancing leadership and relationships by implementing a peer mentoring program.

    Science.gov (United States)

    Gafni Lachter, Liat R; Ruland, Judith P

    2018-03-30

    Peer-mentoring is often described as effective means to promote professional and leadership skills, yet evidence on practical models of such programs for occupational therapy students are sparse. The purpose of this study was to evaluate the outcomes of a peer-mentoring program designed for graduate occupational therapy students. Forty-seven second-year student volunteers were randomly assigned to individually mentor first-year students in a year-long program. Students met biweekly virtually or in person to provide mentorship on everyday student issues, according to mentees' needs. Faculty-led group activities prior and during the peer-mentoring program took place to facilitate the mentorship relationships. Program effectiveness was measured using the Multi-factor Leadership Questionnaire (Avolio & Bass, MLQ: Multifactor Leadership Questionnaire, 2004) and an open-ended feedback survey. Results of multi-variate MANOVA for repeated measures indicating significant enhancement in several leadership skills (F(12,46) = 4.0, P = 0.001, η 2  = 0.579). Qualitative data from feedback surveys indicated that an opportunity to help; forming relationships; and structure as enabler were perceived as important participation outcomes. Students expressed high satisfaction and perceived value from their peer-mentoring experience. As we seek ways to promote our profession and the leadership of its members, it is recommended to consider student peer-mentoring to empower them to practice and advance essential career skills from the initial stages of professional development. Evidence found in this study demonstrates that peer-mentoring programs can promote leadership development and establishment of networks in an occupational therapy emerging professional community, at a low cost. The peer-mentoring blueprint and lessons learned are presented with hopes to inspire others to implement peer-mentoring programs in their settings. © 2018 Occupational Therapy Australia.

  16. Multidisciplinary Mentoring Programs to Enhance Junior Faculty Research Grant Success.

    Science.gov (United States)

    Freel, Stephanie A; Smith, Paige C; Burns, Ebony N; Downer, Joanna B; Brown, Ann J; Dewhirst, Mark W

    2017-10-01

    Junior faculty face challenges in establishing independent research careers. Declining funding combined with a shift to multidisciplinary, collaborative science necessitates new mentorship models and enhanced institutional support. Two multidisciplinary mentorship programs to promote grant success for junior faculty were established at the Duke University School of Medicine beginning in 2011. These four-month programs-the Path to Independence Program (PtIP) for National Institutes of Health (NIH) R applicants and the K Club for NIH K applicants-use multiple senior faculty mentors and professional grant-writing staff to provide a 20-hour joint curriculum comprising a series of lectures, hands-on workshops, career development counseling, peer groups, and an internal study section. In March 2016, the authors analyzed the success rate for all NIH grants submitted by participants since program enrollment. In a 2015 postprogram survey, participants rated their feelings of support and competency across six skill factors. From October 2011 to March 2016, the programs engaged 265 senior faculty mentors, 145 PtIP participants, and 138 K Club participants. Success rates for NIH grant applications were 28% (61 awards/220 decisions) for PtIP participants-an increase over the 2010 Duke University junior faculty baseline of 11%-and 64% (38/59) for K Club participants. Respondents reported significantly increased feelings of support and self-ratings for each competency post program. The authors plan to expand the breadth of both the mentorship pool and faculty served. Broad implementation of similar programs elsewhere could bolster success, satisfaction, and retention of junior faculty investigators.

  17. Application of plant life management program and experience at NRU

    International Nuclear Information System (INIS)

    Nickerson, J.; Dam, R.; Arnold, J.; See Hoye, D.

    2004-01-01

    The National Research Universal (NRU) reactor has seen extensive and excellent service since going into operation in 1957. During that time, significant investments in upgrading and improving the facility have been implemented. Recently, as part of the NRU Licenseability Extension (LE) program, AECL has developed a Plant Life Management (PLiM) program to support planned operation to at least 2012. The objective of the PLiM program is to systematically assess the various aging related degradation mechanisms in order to evaluate both current condition and the potential for further extending service life. Another objective is to identify the associated maintenance, surveillance and inspection strategy for service life extension of important Structures, Systems, and Components (SSCs). The strategy uses approaches that build on AECL's PLiM/PLEx experience at CANDU plants, but also utilizes previous Age Management and refurbishment work performed at NRU. The program is multi-faceted, systematic and integrated, and involves the facility operations organization in the assessment process. The PLiM program has used a number of pilot studies in the initial stages to test out PLiM procedures, gain experience with the various aging assessment techniques and enhance effectiveness of interfaces between the aging assessment team and the facility staff. The aging assessment process begins with the screening and prioritization of the facility SSCs. Selection of the appropriate assessment technique is based on priority and component type. Life and condition assessment techniques used at other plants have been adapted to NRU and performed on important components and structures. For important systems, a combination of condition assessment and systematic maintenance assessment techniques are being used. Detailed PLiM procedures have been developed and are in trial use in pilot studies. These procedures are currently being updated with the experience gained during the pilot studies. In

  18. Football players, asset management & the unexploited potential of enhanced player engagement in football management & marketing

    DEFF Research Database (Denmark)

    Cortsen, Kenneth

    2016-01-01

    This article gives insights into why and how football brands (e.g. clubs and governing bodies) can benefit from enhancing the activation of players in football management and football marketing initiatives.......This article gives insights into why and how football brands (e.g. clubs and governing bodies) can benefit from enhancing the activation of players in football management and football marketing initiatives....

  19. Football players, asset management & the unexploited potential of enhanced player engagement in football management & marketing

    DEFF Research Database (Denmark)

    Cortsen, Kenneth

    2014-01-01

    This article gives insights into why and how football brands (e.g. clubs and governing bodies) can benefit from enhancing the activation of players in football management and football marketing initiatives.......This article gives insights into why and how football brands (e.g. clubs and governing bodies) can benefit from enhancing the activation of players in football management and football marketing initiatives....

  20. The Enhancement of Regional Disaster Management Agencies (BPBD of Sumbawa Regency’s Capability in Flash Flood Management Through Aid Assistance of Japan International Cooperation Agency (JICA

    Directory of Open Access Journals (Sweden)

    Nudia Vebina Ayumahani

    2018-03-01

    Full Text Available The need for enhancing capability has a very important significance in effective disaster management activities. Regional Disaster Management Agencies (BPBD of Sumbawa Regency established cooperation with the Japan International Cooperation Agency (JICA in enhancing the capability of flash flood management. The purpose of this research was to review and evaluate the JICA’s aid assistance programs toward BPBD of Sumbawa Regency, hereafter analyze the impact of the programs. Evaluation and analysis of this research were measured by three indicators of capability which is resources, leadership and policy implementation. This research used a qualitative descriptive method and proceed through the source and method triangulation. The researcher used purposive sampling technique in choosing seven informants from BPBD of Sumbawa Regency’s staff. The results showed that JICA’s aid assistance programs towards BPBD of Sumbawa Regency had been achieved by the targets and goals that have been determined. This program has impacted on enhancing the capability of resources that leads to the ability in Mapping, Technical Guidelines (JUKNIS and Disaster Management Plan (RPB. Increasing the capability of Human Resources (HR gives the effect of increasing capability in other fields such as financial resource capability, technical resource capability, leadership capability and policy implementation capability. The main factors in the success of the capability enhancement are the discipline factor of BPBD staff, high willingness to improve capability by BPBD staff, capability- enhancing programs, and clear direction from JICA.

  1. 75 FR 77821 - Agricultural Water Enhancement Program and Cooperative Conservation Partnership Initiative

    Science.gov (United States)

    2010-12-14

    ... Corporation Agricultural Water Enhancement Program and Cooperative Conservation Partnership Initiative AGENCY... Conservation Service (NRCS) through either the Agricultural Water Enhancement Program (AWEP) or the Cooperative... concerns to be addressed, and specifically what water conservation resource issues and water quality...

  2. Environmental Assessment : Squawfish Management Program : Final.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    Bonneville Power Administration (BPA) proposes to decrease the number of northern squawfish (Ptychocheilus oregonensis) in reservoirs in the Columbia River system. The goal of the Squawfish Management Program is to reduce losses of outmigrating juvenile salmon and steelhead (salmonids) to northern squawfish predation. The objective is to reduce the number of northern squawfish that feed on juvenile salmonids (smolts) by 10 to 20 percent to alter the age and size structure of the northern squawfish population. The hypothesis, based on computer modeling, indicates that sustained northern squawfish harvest (5 to 10 years) and the resultant population restructuring may reduce losses of juvenile salmonids to predation by up to 50 percent or more within 10 years. The proposed action would target northern squawfish 11 inches and longer, the size in which northern squawfish being preying significantly on juvenile salmonids. BPA proposes to fund three types of fisheries to harvest northern squawfish. BPA also proposes to fund monitoring activities of these fisheries to determine whether desired or other results occur. The three fisheries methods proposed are: (1) commercial Tribal fishing; (2) sport reward fishing; and (3) fishing from restricted areas of each dam ( dam angling''). These fisheries were tested in 1990 and 1991.

  3. Enhanced index tracking modeling in portfolio optimization with mixed-integer programming z approach

    Science.gov (United States)

    Siew, Lam Weng; Jaaman, Saiful Hafizah Hj.; Ismail, Hamizun bin

    2014-09-01

    Enhanced index tracking is a popular form of portfolio management in stock market investment. Enhanced index tracking aims to construct an optimal portfolio to generate excess return over the return achieved by the stock market index without purchasing all of the stocks that make up the index. The objective of this paper is to construct an optimal portfolio using mixed-integer programming model which adopts regression approach in order to generate higher portfolio mean return than stock market index return. In this study, the data consists of 24 component stocks in Malaysia market index which is FTSE Bursa Malaysia Kuala Lumpur Composite Index from January 2010 until December 2012. The results of this study show that the optimal portfolio of mixed-integer programming model is able to generate higher mean return than FTSE Bursa Malaysia Kuala Lumpur Composite Index return with only selecting 30% out of the total stock market index components.

  4. Disease management programs for CKD patients: the potential and pitfalls.

    Science.gov (United States)

    Rocco, Michael V

    2009-03-01

    Disease management describes the use of a number of approaches to identify and treat patients with chronic health conditions, especially those that are expensive to treat. Disease management programs have grown rapidly in the United States in the past several years. These programs have been established for patients with chronic kidney disease (CKD), but some have been discontinued because of the high cost of the program. Disease management programs for CKD face unique challenges. Identification of patients with CKD is hampered by incomplete use of the International Classification of Diseases, Ninth Revision (ICD-9) codes for CKD by physicians and the less than universal use of estimated glomerular filtration rate from serum creatinine measurements to identify patients with an estimated glomerular filtration rate less than 60 mL/min/1.73 m(2). CKD affects multiple organ systems. Thus, a comprehensive disease management program will need to manage each of these aspects of CKD. These multiple interventions likely will make a CKD disease management program more costly than similar disease management programs designed for patients with diabetes mellitus, congestive heart failure, or other chronic diseases. The lack of data that can be used to develop effective disease management programs in CKD makes it difficult to determine goals for the management of each organ system affected by CKD. Finally, long periods of observation will be needed to determine whether a particular disease management program is effective in not only improving patient outcomes, but also decreasing both resource use and health care dollars. This long-term observation period is contrary to how most disease management contracts are written, which usually are based on meeting goals during a 1- to 3-year period. Until these challenges are resolved, it likely will be difficult to maintain effective disease management programs for CKD.

  5. Federal Energy Efficiency through Utility Partnerships: Federal Energy Management Program (FEMP) Program Overview Fact Sheet

    International Nuclear Information System (INIS)

    Beattie, D.; Wolfson, M.

    2001-01-01

    This Utility Program Overview describes how the Federal Energy Management Program (FEMP) utility program assists Federal energy managers. The document identifies both a utility financing mechanism and FEMP technical assistance available to support agencies' implementation of energy and water efficiency methods and renewable energy projects

  6. Export Management Specialist. A Training Program. Instructor's Edition.

    Science.gov (United States)

    Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    This publication provides instructors with materials for an export management specialist (EMS) training program. The objective of the training program is to assist companies in reaching their export goals by educating current and potential managers about the basics of exporting. It provides a foundation for considering international trade and for…

  7. NASA and FAA Programs in Air Traffic Management

    Science.gov (United States)

    Condon, Gregory W.

    1995-01-01

    This presentation will present an overview of NASA and joint NASA/FAA R&D programs related to Air Traffic Management. In addition it will address the plans for the new Advanced Air Transportation Technologies program, which will investigate methods for achieving the airline industries needs for increased flexibility in the nation's air traffic management system.

  8. 76 FR 72029 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-11-21

    ... in the FHWA Multistate Corridor Operations and Management Program as authorized in 23 U.S.C. 511... Multistate Corridor Operations and Management Program as authorized in 23 U.S.C. 511. This notice clarifies... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Multistate Corridor Operations and...

  9. Sandia National Laboratories, California Chemical Management Program annual report.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2012-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Chemical Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Chemical Management Program, one of six programs that supports environmental management at SNL/CA. SNL/CA is responsible for tracking chemicals (chemical and biological materials), providing Material Safety Data Sheets (MSDS) and for regulatory compliance reporting according to a variety of chemical regulations. The principal regulations for chemical tracking are the Emergency Planning Community Right-to-Know Act (EPCRA) and the California Right-to-Know regulations. The regulations, the Hazard Communication/Lab Standard of the Occupational Safety and Health Administration (OSHA) are also key to the CM Program. The CM Program is also responsible for supporting chemical safety and information requirements for a variety of Integrated Enabling Services (IMS) programs primarily the Industrial Hygiene, Waste Management, Fire Protection, Air Quality, Emergency Management, Environmental Monitoring and Pollution Prevention programs. The principal program tool is the Chemical Information System (CIS). The system contains two key elements: the MSDS library and the chemical container-tracking database that is readily accessible to all Members of the Sandia Workforce. The primary goal of the CM Program is to ensure safe and effective chemical management at Sandia/CA. This is done by efficiently collecting and managing chemical information for our customers who include Line, regulators, DOE and ES and H programs to ensure compliance with regulations and to streamline customer business processes that require chemical information.

  10. A Primer on the Financial Management of Experiential Learning Assessment Programs.

    Science.gov (United States)

    MacTaggart, Terrence

    1983-01-01

    The success and failure of experiential learning assessment programs rests not only on their academic quality, but also on their financial management. Types of cost and the meaning of cost-effectiveness are discussed. Break-even analysis, cost-reduction activities, and revenue-enhancement techniques are described. (Author/MLW)

  11. Use of Self-Management with the CW-FIT Group Contingency Program

    Science.gov (United States)

    Kamps, Debra; Conklin, Carl; Wills, Howard

    2015-01-01

    The purpose of the study was to determine the effects of self-management as a tier two enhancement to the group contingency intervention, Class-Wide Function-related Intervention Teams Program (CW-FIT). Two classrooms, first and fourth grade, and two students in each of the classrooms participated in the intervention. The group contingency…

  12. Children's Fitness. Managing a Running Program.

    Science.gov (United States)

    Hinkle, J. Scott; Tuckman, Bruce W.

    1987-01-01

    A running program to increase the cardiovascular fitness levels of fourth-, fifth-, and sixth-grade children is described. Discussed are the running environment, implementation of a running program, feedback, and reinforcement. (MT)

  13. Financial Management: Emergency Steel Loan Guarantee Program

    National Research Council Canada - National Science Library

    2001-01-01

    In a February 1, 2001 letter, you expressed concerns about repayments of federally guaranteed loans by borrowers under the Emergency Steel Loan Guarantee Program and the effect of the program on the U.S. steel industry...

  14. Program Management Officer | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    English · Français ... Reviews project and program material and prepares synthesis documents of results, decisions, and directions for team discussion; Researches specific topics of interest to the program to enrich the knowledge of team ...

  15. Radiological control technician: Training program management manual

    International Nuclear Information System (INIS)

    1992-10-01

    This manual defines and describes the DOE Radiological Control Technician Core Training Program qualification and training process, material development requirements, standards and policies, and administration. The manual applies to Radiological Control Technician Training Programs at all DOE contractor sites

  16. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  17. Training method for enhancement of safety attitude in nuclear power plant based on crew resource management

    International Nuclear Information System (INIS)

    Ishibashi, Akira; Karikawa, Daisuke; Takahashi, Makoto; Wakabayashi, Toshio; Kitamura, Masaharu

    2010-01-01

    A conventional training program for nuclear power plant operators has been developed with emphasis on improvement of knowledge and skills of individual operators. Although it has certainly contributed to safety operation of nuclear power plants, some recent incidents have indicated the necessity of an improved training program aiming at improvement of the performance of operators working as a team. In the aviation area, crew resource management (CRM) training has shown the effect of resolving team management issues of flight crews, aircraft maintenance crews, and so on. In the present research, we attempted to introduce the CRM concept into operator training in nuclear power plants as training for conceptual skill enhancement. In this paper, a training method specially customized for nuclear power plant operators based on CRM is proposed. The proposed method has been practically utilized in the management training course of Japan Nuclear Technology Institute. The validity of the proposed method has been evaluated by means of a questionnaire survey. (author)

  18. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978

    International Nuclear Information System (INIS)

    1976-01-01

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only

  19. Managing Student Affairs Programs: Methods, Models, Muddles.

    Science.gov (United States)

    Deegan, William L.

    Management processes and problems are examined in a variety of student affairs contexts. This book (1) proposes a theoretical framework for the analysis of management functions in colleges and universities, (2) studies the practice of management in several different student affairs contexts to uncover current practices, issues, problems, and…

  20. Gravel roads management : volume 3, gravel roads management : programming guide.

    Science.gov (United States)

    2010-10-01

    This report establishes procedures for managing dirt and gravel roads, with a primary focus on smaller agencies, such as Wyoming counties, that must manage their roads with very limited resources. The report strives, first, to guide and assist smalle...

  1. Assurance management program for the 30 Nova laser fusion project

    International Nuclear Information System (INIS)

    Levy, A.J.

    1983-01-01

    The Nova assurance management program was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management program. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project

  2. PROGER - Management program for radioactive wastes in research institutions

    International Nuclear Information System (INIS)

    Ferreira, Rubemar S.; Costa, Maria Regina Ferro; Ramos Junior, Anthenor C.; Esposito, Irapoan; Vaz, Solange dos Reis e; Pontedeiro, Elizabeth May; Gomes, Carlos de Almeida

    1997-01-01

    This article demonstrates the feasibility of a program, denominated PROGER, and aimed at the improvement of radioactive waste management activities in research institutions in Brazil. This program involves implementation, correction and updating of waste management techniques in those institutions that already possess a waste management system or its full set-up for the institutions where it is non-existent. Partial results are presented, concerning characteristics and quantities of wastes, and the methodology utilized by PROGER discussed

  3. Modified benchmarking study of program management within a matrix structure

    OpenAIRE

    Fuller, Robin S.

    1996-01-01

    This thesis sought to identify several organizations representing both the government and commercial industry that were successful in implementing program management within a matrix structure to isolate best-practices that lead to superior performance. Research data were gathered from current and former program managers from these organizations. These managers were queried about their experiences with the matrix structure: the matrix implementation process, benefits, pitfalls, and lessons lea...

  4. The Enhancement Seminar Model as a Strategy to Promote Diversity and Student Success in MSW Programs

    Science.gov (United States)

    Watson, Larry D.; Rycraft, Joan R.

    2010-01-01

    This study evaluates the effectiveness of an enhancement program by examining a cohort of 57 students admitted on probationary status to an MSW program in 2002 and required to participate in the enhancement program. The demographics for students admitted on probation demonstrate that the program is effective in increasing the diversity of the…

  5. Posture management program based on theory of planned behavior for adolescents with mild idiopathic scoliosis.

    Science.gov (United States)

    Choi, Jihea; Kim, Hee Soon; Kim, Gwang Suk; Lee, Hyejung; Jeon, Hye-Seon; Chung, Kyong-Mee

    2013-09-01

    The purpose of this study was to evaluate the effects of a devised posture management program based on the Theory of Planned Behavior in adolescents with mild idiopathic scoliosis. A quasi-experimental study was conducted. It involved a nonequivalent comparison group design with pretest and posttest. Forty-four female adolescents with mild idiopathic scoliosis participated; data from 35 participants (20 for the test group, 15 for the control group) were used for the final analyses. The devised posture management program ran for 6 weeks. Posture management behavioral determinants (attitude, subjective norms, perceived behavioral control, and behavioral intention) as cognitive outcomes and muscular strength and flexibility as physical outcomes were measured three times: at baseline, week 6 and week 8. Cobb's angle as another physical outcome was measured twice: at baseline and week 8. Descriptive analysis, repeated measures analysis of variance and t test were used for data analyses. Attitude, perceived control, and behavioral intention were consistently enhanced by the posture management program. The intervention increased flexibility and muscular strength and decreased Cobb's angle, which reduced spinal curvature. Frequency of posture management exercise showed a gradual increase in the test group. The results indicate that the posture management program is effective in maintaining posture management behavior in adolescents with mild idiopathic scoliosis for both cognitive and physical outcomes. The posture management program should be helpful in expanding the role of school nurses in improving the health status of adolescents with mild idiopathic scoliosis. Copyright © 2013. Published by Elsevier B.V.

  6. [The German program for disease management guidelines--implementation with pathways and quality management].

    Science.gov (United States)

    Ollenschläger, Günter; Lelgemann, Monika; Kopp, Ina

    2007-07-15

    In Germany, physicians enrolled in disease management programs are legally obliged to follow evidence-based clinical practice guidelines. That is why a Program for National Disease Management Guidelines (German DM-CPG Program) was established in 2002 aiming at implementation of best-practice evidence-based recommendations for nationwide as well as regional disease management programs. Against this background the article reviews programs, methods and tools for implementing DM-CPGs via clinical pathways as well as regional guidelines for outpatient care. Special reference is given to the institutionalized program of adapting DM-CPGs for regional use by primary-care physicians in the State of Hesse.

  7. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R ampersand D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER ampersand WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT ampersand E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs

  8. 75 FR 30106 - Terrorism Risk Insurance Program; Litigation Management Submissions

    Science.gov (United States)

    2010-05-28

    ... DEPARTMENT OF THE TREASURY Terrorism Risk Insurance Program; Litigation Management Submissions... U.S.C. 3506(c)(2)(A)). Currently, the Terrorism Risk Insurance Program Office is seeking comments... or by mail (if hard copy, preferably an original and two copies) to: Terrorism Risk Insurance Program...

  9. Effects of a pain program on nurses' pharmacological pain management

    NARCIS (Netherlands)

    Francke, AL; Dingemans, WA; Borg, PAJ; Luiken, JB; Grypdonck, M; Abu-Saad, HH

    1999-01-01

    Surgical nurses from five Dutch general hospitals participated in a continuing education program on pain assessment and management. Effects of the program were measured in a pretest-post-test control group design, in which nursing wards were randomly allocated to the experimental condition (program)

  10. Building Maintenance and Utilities Management. Florida Vocational Program Guide.

    Science.gov (United States)

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This program guide identifies primary concerns in the organization, operation, and evaluation of a building maintenance and utilities management program. It is designed for local school district and community college administrators, instructors, program advisory committees, and regional coordinating councils. The guide begins with the Dictionary…

  11. 76 FR 80342 - Coastal Zone Management Program: Illinois

    Science.gov (United States)

    2011-12-23

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Coastal Zone Management... program under the Coastal Zone Management Act (CZMA), as amended at 16 U.S.C. 1451-1466, and the...). SUPPLEMENTARY INFORMATION: The Coastal Zone Management Act authorizes the Secretary of Commerce (Secretary) to...

  12. Anger Management Program Participants Gain Behavioral Changes in Interpersonal Relationships

    Science.gov (United States)

    Pish, Suzanne; Clark-Jones, Teresa; Eschbach, Cheryl; Tiret, Holly

    2016-01-01

    RELAX: Alternatives to Anger is an educational anger management program that helps adults understand and manage anger, develop communication skills, manage stress, and make positive behavioral changes in their interpersonal relationships. A sample of 1,168 evaluation surveys were collected from RELAX: Alternatives to Anger participants over 3…

  13. Comparison between goal programming and cointegration approaches in enhanced index tracking

    Science.gov (United States)

    Lam, Weng Siew; Jamaan, Saiful Hafizah Hj.

    2013-04-01

    Index tracking is a popular form of passive fund management in stock market. Passive management is a buy-and-hold strategy that aims to achieve rate of return similar to the market return. Index tracking problem is a problem of reproducing the performance of a stock market index, without purchasing all of the stocks that make up the index. This can be done by establishing an optimal portfolio that minimizes risk or tracking error. An improved index tracking (enhanced index tracking) is a dual-objective optimization problem, a trade-off between maximizing the mean return and minimizing the tracking error. Enhanced index tracking aims to generate excess return over the return achieved by the index. The objective of this study is to compare the portfolio compositions and performances by using two different approaches in enhanced index tracking problem, which are goal programming and cointegration. The result of this study shows that the optimal portfolios for both approaches are able to outperform the Malaysia market index which is Kuala Lumpur Composite Index. Both approaches give different optimal portfolio compositions. Besides, the cointegration approach outperforms the goal programming approach because the cointegration approach gives higher mean return and lower risk or tracking error. Therefore, the cointegration approach is more appropriate for the investors in Malaysia.

  14. Civilian radioactive waste management program plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  15. EC6 for Darlington - a managed-enhancements replication project

    International Nuclear Information System (INIS)

    Soulard, M.R.

    2011-01-01

    of these activities can be undertaken with the reactor at power. Enhancements incorporated into the EC6 design to improve performance and facilitate maintenance include: Use of improved material and plant chemistry specifications based on operating experience from CANDU plants, e.g. life-limiting components such as HTS feeders and headers have been enhanced with higher chromium content to limit the effect of feeder corrosion; Implementation of advanced computer control systems for monitoring, display, diagnostics and annunciation and improvement of configuration management capability; Utilization of SMART CANDU modules for monitoring plant chemistry of systems and components, equipment status monitoring, and providing predictive maintenance capability; Ensuring capability for return to full power on restoration of the electrical grid. The EC6 reactor has the capability to continue operating and delivering house load without connection to the grid, therefore enabling a rapid return to production of power upon reconnection; A maintenance-based design strategy. This program incorporates lessons learned and ensures maintainability of systems and components. It defines an improved maintenance program to ensure plant conditions are diagnosed and maintained within their design performance limits. This results in improved preventive maintenance and reduced forced outages at a rate of less than five days/year; Improved plant maintenance with provisions for electrical, water and air supplies that are built-in for on-power and normal shutdown maintenance; Shielding in radiologically controlled areas is provided to minimize worker exposure and occupational dose; Improved equipment selection and system design based on probabilistic safety evaluations using three-year outage intervals; and, The EC6 design offers a target life of 60 years with one mid-life refurbishment of certain critical equipment, such as the fuel channels and feeders. This objective is achieved by elongating

  16. Waste management program at Atomic Energy of Canada Limited

    Energy Technology Data Exchange (ETDEWEB)

    Wong, P.C.F.; Chan, N.; Hawrelluk, K. [Atomic Energy of Canada Limited, Chalk River, ON (Canada)

    2011-07-01

    The Atomic Energy of Canada Limited (AECL) Waste Management Program establishes requirements for waste management activities at AECL sites in Canada. It ensures that activities involving planning for, handling, processing, transporting, storage and long-term management of wastes are performed in a manner that protects the workers, the public, and the environment, and are in compliance with applicable regulatory and licence requirements. The program translates applicable legal requirements into program requirements appropriate for AECL, and assists AECL management in implementing those requirements. The Waste Management Program was formally established at AECL in 2007 as one of the nuclear programs. The activities conducted in the first two years (2007 - 09) were mainly focused on program development. Currently the program is executing the waste management improvement initiatives based on the Waste Management Program Improvement Plan. During the program implementation, close collaboration between the Waste Management Program and other departments resulted in improved waste management performance at Chalk River Laboratories (CRL). This included increased segregation of the waste at the source, reduction in waste generation, improved labeling and identification of waste packages, improved recyclables collection and initiating recycling of selected hazardous wastes. In accordance with pollution prevention, the quantities and degree of hazard of wastes requiring long-term management shall be minimized, following the principles of Prevent, Reduce, Reuse, and Recycle. The annual volume of solid waste generated is one of the key indicators for waste management performance. AECL has been successful in reduction of operational waste and diversion of materials for recycling at CRL. From 2007 to 2010, the annual volume of solid waste, including inactive and radioactive wastes, generated from routine operations at CRL decreased by 26%, and the annual amount of recyclables sent

  17. Waste management program at Atomic Energy of Canada Limited

    International Nuclear Information System (INIS)

    Wong, P.C.F.; Chan, N.; Hawrelluk, K.

    2011-01-01

    The Atomic Energy of Canada Limited (AECL) Waste Management Program establishes requirements for waste management activities at AECL sites in Canada. It ensures that activities involving planning for, handling, processing, transporting, storage and long-term management of wastes are performed in a manner that protects the workers, the public, and the environment, and are in compliance with applicable regulatory and licence requirements. The program translates applicable legal requirements into program requirements appropriate for AECL, and assists AECL management in implementing those requirements. The Waste Management Program was formally established at AECL in 2007 as one of the nuclear programs. The activities conducted in the first two years (2007 - 09) were mainly focused on program development. Currently the program is executing the waste management improvement initiatives based on the Waste Management Program Improvement Plan. During the program implementation, close collaboration between the Waste Management Program and other departments resulted in improved waste management performance at Chalk River Laboratories (CRL). This included increased segregation of the waste at the source, reduction in waste generation, improved labeling and identification of waste packages, improved recyclables collection and initiating recycling of selected hazardous wastes. In accordance with pollution prevention, the quantities and degree of hazard of wastes requiring long-term management shall be minimized, following the principles of Prevent, Reduce, Reuse, and Recycle. The annual volume of solid waste generated is one of the key indicators for waste management performance. AECL has been successful in reduction of operational waste and diversion of materials for recycling at CRL. From 2007 to 2010, the annual volume of solid waste, including inactive and radioactive wastes, generated from routine operations at CRL decreased by 26%, and the annual amount of recyclables sent

  18. NEPTUNE Helping Program Managers Understand Their Program Customers

    National Research Council Canada - National Science Library

    Uriell, Zannette

    2004-01-01

    .... This annotated brief outlines some of these studies and discusses in greater detail a recent project that assessed a number of dissimilar programs, leading to the creation of the NEPTUNE System...

  19. Acquisition: Implementation of the DoD Management Control Program for Navy Acquisition Category II and III Programs

    National Research Council Canada - National Science Library

    2004-01-01

    ... deviations in cost, schedule, and performance requirements in acquisition program baselines for Acquisition Category II and III programs and in identifying whether program managers are reporting...

  20. Management of nonregulatory driven program risks

    International Nuclear Information System (INIS)

    Nielsen, R.R.; Hutterman, L.L.

    1995-01-01

    Evaluation of program risk is a significant part of any environmental restoration (ER) activity. While significant efforts have been made to assess risk to human health and the environment, program risks outside of CERCLA are handled on a fire drill basis. This paper explains a process that looks at program risk, directs mitigation efforts in the most useful path, and focuses corrective actions to obtain the most benefits from the resources used

  1. Successful healthcare programs and projects: organization portfolio management essentials.

    Science.gov (United States)

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  2. Training Programs for Managing Well-being in Companies

    Directory of Open Access Journals (Sweden)

    Treven Sonja

    2015-08-01

    Full Text Available This paper discussed the significance of well-being (WB and well-being management (WBM. As successful WBM requires the implementation of different training programs, such programs are presented in detail. The cause–effect relationship between training and individual/organizational performance is researched as well. The aim of the research to support this article was to present WBM, its training programs, as well as the determination of WBM activities concerning the mentioned programs implemented in Slovenian organizations.

  3. Pooled inventory management: a unique cost-sharing program

    International Nuclear Information System (INIS)

    Bromenschenkel, K.E.

    1984-01-01

    A totally fresh approach to stocking an inventory of costly, long-lead-time nuclear plant equipment became a reality in January, 1981, after three years of effort to form the program. The program, known as Pooled Inventory Management (PIM), is now procuring the first equipment to be stocked in its inventory. This report describes the formation of PIM, how the program works, PIM accomplishments, equipment included in PIM stockpiles, and economics, implementation, and future plans of the program

  4. Educational support programs: Office of Civilian Radioactive Waste Management

    International Nuclear Information System (INIS)

    Williamson, R.C.

    1989-01-01

    The Office of Civilian Radioactive Waste Management (OCRWM) currently sponsors two educationally related programs: the Radioactive Waste Management Fellowship Program and the Radioactive Waste Management Research Program for Historically Black Colleges and Universities (HBCU). The graduate fellowship program was implemented in 1985 to meet the US Department of Energy's (DOE's) expected manpower needs for trained scientists and engineers to assist in carrying out the activities of the Nuclear Waste Policy Act. It is recognized that a shortage of master's and doctoral level scientists and engineers in disciplines supportive of the nation's high-level radioactive waste management (RWM) program may impede the DOE's ability to properly carry out its mission under the act. The fellowship program encourages talented undergraduate students to enter graduate programs designed to educate and train them in fields directly related to RWM. The program supports graduate students in various disciplines, including nuclear science and engineering, health physics, and certain area of geology and chemical engineering. It also encourages universities to support and improve research activities and academic programs related to the management of spent nuclear fuel and high-level radioactive waste

  5. Nurse manager residency program: an innovative leadership succession plan.

    Science.gov (United States)

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence.

  6. Hazardous Waste Remedial Actions Program: integrating waste management

    International Nuclear Information System (INIS)

    Petty, J.L.; Sharples, F.E.

    1986-01-01

    The Hazardous Waste Remedial Actions Program was established to integrate Defense Programs' activities in hazardous and mixed waste management. The Program currently provides centralized planning and technical support to the Office of the Assistant Secretary for Defense Programs. More direct project management responsibilities may be assumed in the future. The Program, under the direction of the ASDP's Office of Defense Waste and Transportation Management, interacts with numerous organizational entities of the Department. The Oak Ridge Operations Office has been designated as the Lead Field Office. The Program's four current components cover remedial action project identification and prioritization; technology adaptation; an informative system; and a strategy study for long-term, ''corporate'' project and facility planning

  7. National Syrian Program for Radioactive Waste Management

    International Nuclear Information System (INIS)

    Othman, I.; Takriti, S.

    2009-06-01

    A national plan for radioactive waste management has been presented. It includes identifying, transport, recording, classifying, processing and disposal. It is an important reference for radioactive waste management for those dealing with radioactive waste, and presents a complete protection to environemnt and people. (author)

  8. An Environmental Management Maturity Model of Construction Programs Using the AHP-Entropy Approach

    Directory of Open Access Journals (Sweden)

    Libiao Bai

    2018-06-01

    Full Text Available The accelerating process of urbanization in China has led to considerable opportunities for the development of construction projects, however, environmental issues have become an important constraint on the implementation of these projects. To quantitatively describe the environmental management capabilities of such projects, this paper proposes a 2-dimensional Environmental Management Maturity Model of Construction Program (EMMMCP based on an analysis of existing projects, group management theory and a management maturity model. In this model, a synergetic process was included to compensate for the lack of consideration of synergies in previous studies, and it was involved in the construction of the first dimension, i.e., the environmental management index system. The second dimension, i.e., the maturity level of environment management, was then constructed by redefining the hierarchical characteristics of construction program (CP environmental management maturity. Additionally, a mathematical solution to this proposed model was derived via the Analytic Hierarchy Process (AHP-entropy approach. To verify the effectiveness and feasibility of this proposed model, a computational experiment was conducted, and the results show that this approach could not only measure the individual levels of different processes, but also achieve the most important objective of providing a reference for stakeholders when making decisions on the environmental management of construction program, which reflects this model is reasonable for evaluating the level of environmental management maturity in CP. To our knowledge, this paper is the first study to evaluate the environmental management maturity levels of CP, which would fill the gap between project program management and environmental management and provide a reference for relevant management personnel to enhance their environmental management capabilities.

  9. Waste Management Program. Technical progress report, October-December 1982

    International Nuclear Information System (INIS)

    1983-07-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, in situ storage or disposal, waste from development and characterization, process and equipment development, and low-level waste management are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities

  10. Industrial research enhancement program at the National Synchrotron Light Source

    International Nuclear Information System (INIS)

    Wang Jun; Nasta, Kathleen; Kao, Chi-Chang

    2011-01-01

    Industrial research has attracted more and more attention recently at synchrotron facilities. Bringing the state-of-the-art research capabilities provided by these facilities to the industrial user community will help this community to improve their products and processing methods, to foster competition and build the economy. The National Synchrotron Light Source (NSLS) has a long and celebrated history in research partnerships with industry since its inception more than 25 years ago, and both industry and the facility have benefited tremendously from these partnerships. Over the years, the ways in which industrial research is conducted at synchrotron facilities have evolved significantly, and a new paradigm of collaboration between industry and facilities is clearly needed to address this changing situation. In this presentation, the discussion will focus on an enhancement plan recently implemented at the NSLS to address industrial users' concerns and needs. The goal of NSLS Industrial Program Enhancement plan is to encourage greater use of synchrotron tools by industry researchers, improve access to NSLS beamlines by industrial researchers and facilitate research collaborations between industrial researchers and NSLS staff as well as researchers from university and government laboratories. Examples of recent developments in these areas will be presented.

  11. Philosophy and overview of the INEL waste management program

    International Nuclear Information System (INIS)

    Gertz, C.P.; Whitsett, J.B.; Hamric, J.P.

    1986-01-01

    The INEL philosophy of ''get the job done; do it right--the first time'' is described as it applies to all phases of waste management activities. In addition, an overview of INEL's waste management programs and projects--low-level waste management operations and technology development; transuranic waste management operations and technology development; high-level waste management operations and technology development; spent fuel storage operations and equipment/technology development; transportation operations, technology development, and prototype cask procurements--are discussed. Emphasis is placed on the application of the INEL philosophy to the successful initiation and continuation of INEL waste management activities

  12. Management and Fragmentation of a Network Program

    DEFF Research Database (Denmark)

    Jørgensen, Kenneth Mølbjerg

    This paper contains an analysis of the role of identity in interorganizational collaboration. The case is a network program that involved three parties: eight companies, one consulting institution and a research institution. The purpose of the network program was to develop and test concepts...... and methods within organizational learning and it was supported by the Danish government. The three parties had different roles in the program. The eight companies all participated as experiments for organizational learning. Consultants from the consulting institution acted as consultants on the eight...

  13. Hanford Site Groundwater Protection Management Program: Revision 1

    International Nuclear Information System (INIS)

    1993-11-01

    Groundwater protection is a national priority that is promulgated in a variety of environmental regulations at local, state, and federal levels. To effectively coordinate and ensure compliance with applicable regulations, the US Department of Energy has issued DOE Order 5400.1 (now under revision) that requires all US Department of Energy facilities to prepare separate groundwater protection program descriptions and plans. This document describes the Groundwater Protection Management Program for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the Groundwater Protection Management Program cover the following general topical areas: (1) documentation of the groundwater regime, (2) design and implementation of a groundwater monitoring program to support resource management and comply with applicable laws and regulations, (3) a management program for groundwater protection and remediation, (4) a summary and identification of areas that may be contaminated with hazardous waste, (5) strategies for controlling these sources, (6) a remedial action program, and (7) decontamination and decommissioning and related remedial action requirements. Many of the above elements are covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing groundwater protection activities. Additionally, it describes how information needs are identified and can be incorporated into existing or proposed new programs. The Groundwater Protection Management Program provides the general scope, philosophy, and strategies for groundwater protection/management at the Hanford Site. Subtier documents provide the detailed plans for implementing groundwater-related activities and programs. Related schedule and budget information are provided in the 5-year plan for environmental restoration and waste management at the Hanford Site

  14. Defense Leadership and Management Program (DLAMP)

    National Research Council Canada - National Science Library

    Ramp, S

    1997-01-01

    This Directive, under Chapters 23, 33, 41, and 71 of title 5, United States Code, establishes policy and assigns responsibilities for a program of civilian leader training, education, and development...

  15. Best Management Practices, Policies and Programs

    Science.gov (United States)

    The National Great Practice Compendium highlights outstanding activities, technologies, and programs that prevent trash from entering the aquatic environment and/or that reduce the overall volume of trash that is generated.

  16. Program Management Officer -Think Tank Initiative | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    English · Français ... minutes and meeting reports of a technical nature to ensure discussions and decisions are well documented ... the Centre; Reviews project and program material and prepares synthesis documents of results, decisions, ...

  17. Information Management and Employee Assistance Program Imperatives.

    Science.gov (United States)

    Bickerton, Richard

    1987-01-01

    The ALMACA Clearinghouse for Employee Assistance Program (EAP) Information collects and disseminates EAP-specific data to provide subscribers with information to maintain their own competence and to improve upon the understanding and use of EAP practices and procedures. (JOW)

  18. DOE waste management program-current and future

    International Nuclear Information System (INIS)

    Coleman, J.A.

    1993-01-01

    The back end of the nuclear fuel cycle, as well as many operations in the Department of Energy, involves management of radioactive and hazardous waste and spent nuclear fuel. Described herein is the current and anticipated Department's Waste Management Program and general information about the Program for managing and disposing of waste that will illustrate the importance of air cleaning and treatment in assuring protection of the public and our environment. The structure and responsibilities of the Office of Environmental Restoration and Waste Management (EM) are described. The categories of waste managed by the Office of Waste Management (OWM) are defined. The problems of waste management, waste minimization, and waste treatment, storage, and disposal are discussed. 4 figs

  19. 78 FR 24212 - Tribal Management Grant Program

    Science.gov (United States)

    2013-04-24

    ... eligible to receive this grant only if it is incorporated for the primary purpose of improving AI/AN health... that will impact their management capability or prepare them for future improvements to their...

  20. DoD Records Management Program

    National Research Council Canada - National Science Library

    Arnason, C

    1997-01-01

    ... title 36, Code of Federal Regulations, Chapter XII, 'National Archives and Records Administration,' Subchapter B, 'Records Management,' under the Assistant Secretary of Defense for Command, Control, Communications and Intelligence (ASD(C3I...

  1. Small Business and the Risk Management Program

    Science.gov (United States)

    This factsheet helps small businesses comply with the regulation requiring companies that use regulated substances, hazardous chemical such as ammonia and chlorine, to develop a risk management plan, to help prevent accidental toxic or flammable releases.

  2. Patient and Nurse Experiences in a Rural Chronic Disease Management Program: A Qualitative Evaluation.

    Science.gov (United States)

    Davisson, Erica A; Swanson, Elizabeth A

    Rural status confounds chronic disease self-management. The purpose of this qualitative, descriptive study was to evaluate the nurse-led "Living Well" chronic disease management program reporting patient recruitment and retention issues since program initiation in 2013. The Chronic Care Model (CCM) was the guiding framework used to reinforce that interdisciplinary teams must have productive patient interactions for their program(s) to be sustainable. A rural, Midwest county clinic's chronic disease management program. Observations, interviews, and within- and across-case coding were used. Patients' responses were analyzed to identify (1) reasons for recruitment and retention problems and (2) program elements that were viewed as successful or needing improvement. A convenience sample of 6 rural, English-speaking adults (65 years or older, with no severe cognitive impairment) with at least one chronic condition was recruited and interviewed. Themes emerged related to nurse knowledge, availability, and value; peer support; overcoming barriers; adherence enhancement; and family/friends' involvement. Patients reported engagement in self-management activities because of program elements such as support groups and productive nurse-patient interactions. Interdisciplinary communication, commitment, and patient referral processes were identified as reasons for recruitment and retention issues. Findings substantiated that certain elements must be present and improved upon for future rural programs to be successful. Interdisciplinary communication may need to be improved to address recruitment and retention problems. It was clear from patient interviews that the nurse coordinators played a major role in patients' self-management adherence and overall satisfaction with the program. This is important to case management because results revealed the need for programs of this nature that incorporate the vital role of nurse coordinators and align with the CCM value of providing a

  3. Effective Factors in Enhancing School Managers' Job Motivation

    Directory of Open Access Journals (Sweden)

    S. Mahmoud Mirzamani

    2011-10-01

    Full Text Available "nObjective: This study examines the effective factors in enhancing school managers' job motivation from viewpoint of school mangers, teachers, education department managerial and staff experts in teaching, and also identifies and prioritizes each of these factors and indicators. "nMethod: For selecting a representative sample and increasing measurement precision, 587 people were selected using classified random sampling. The measurement tool was a 79-questionnaire made by the researcher. The questionnaire was collected using motivation theories and observing the findings of previous researches. Then, according to the three-stage Delphi technique, the questionnaire was sent to experts in education. The reliability of instruments was measured by calculating Cronbach's Alpha coefficient, and total reliability of the test was 0.99; the validity of the instrument was assessed by factor analysis (Construct Validity and its load factor was 0.4 which was high. "nResults: The results from factor analysis shows that the effective factors in enhancing managers' job motivation are as follows: self- actualization (51% including 28 indices; social factor (7/9% including 22 indices; self-esteem (3.2% including 17 indices; job desirable features (2.2% including 4 indices; physiologic (1.8% including 4 indices; and job richness (1.6% including 4 indices. "nConclusions: The results show that the six mentioned factors determine 68% of the total variance of managers' motivation.

  4. Program Director Participation in a Leadership and Management Skills Fellowship and Characteristics of Program Quality.

    Science.gov (United States)

    Carek, Peter J; Mims, Lisa D; Conry, Colleen M; Maxwell, Lisa; Greenwood, Vicki; Pugno, Perry A

    2015-01-01

    The association between a residency program director completing a leadership and management skills fellowship and characteristics of quality and innovation of his/her residency program has not been studied. Therefore, the aim of this study is to examine the association between a residency program director's completion of a specific fellowship addressing these skills (National Institute for Program Director Development or NIPDD) and characteristics of quality and innovation of the program they direct. Using information from the American Academy of Family Physicians (AAFP), National Resident Matching Program (NRMP) and FREIDA® program characteristics were obtained. Descriptive statistics were used to summarize the data. The relationship between programs with a NIPDD graduate as director and program quality measures and indicators of innovation was analyzed using both chi square and logistic regression. Initial analyses showed significant associations between the NIPDD graduate status of a program director and regional location, mean years of program director tenure, and the program's 5-year aggregate ABFM board pass rate from 2007--2011. After grouping the programs into tertiles, the regression model showed significant positive associations with programs offering international experiences and being a NIPDD graduate. Program director participation in a fellowship addressing leadership and management skills (ie, NIPDD) was found to be associated with higher pass rates of new graduates on a Board certification examination and predictive of programs being in the upper tertile of programs in terms of Board pass rates.

  5. Enhancing the Biodiversity of Ditches in Intensively Managed UK Farmland.

    Directory of Open Access Journals (Sweden)

    Rosalind F Shaw

    or enhance the biodiversity value of ditches, and improve their ecosystem service delivery, management prescriptions for hedgerows adjacent to ditches should differ from those aimed at hedgerows only.

  6. Enhancing the Biodiversity of Ditches in Intensively Managed UK Farmland.

    Science.gov (United States)

    Shaw, Rosalind F; Johnson, Paul J; Macdonald, David W; Feber, Ruth E

    2015-01-01

    Drainage ditches, either seasonally flooded or permanent, are commonly found on intensively managed lowland farmland in the UK. They are potentially important for wetland biodiversity but, despite their ubiquity, information on their biodiversity and management in the wider countryside is scarce. We surveyed 175 ditches for their physical and chemical characteristics, spatial connectivity, plant communities and aquatic invertebrates in an area of intensively managed farmland in Oxfordshire, UK and collected information on ditch management from farmer interviews. Water depth and shade had a small impact on the diversity of plant and invertebrate communities in ditches. Increased shade over the ditch channel resulted in reduced taxonomic richness of both channel vegetation and aquatic invertebrates and channel vegetation cover was lower at shaded sites. Invertebrate taxonomic richness was higher when water was deeper. Spatial connectivity had no detectable impact on the aquatic invertebrate or plant communities found in ditches. The number of families within the orders Ephemeroptera, Plecoptera and Trichoptera (EPT), which contain many pollution-sensitive species, declined with decreasing pH of ditch water. As time since dredging increased, the number of EPT families increased in permanent ditches but decreased in temporary ditches. Whether or not a ditch was in an agri-environment scheme had little impact on the reported management regime or biodiversity value of the ditch. Measures for increasing the amount of water in ditches, by increasing the water depth or promoting retention of water in ditches, could increase the biodiversity value of ditches in agricultural land. Some temporary ditches for specialised species should be retained. Reducing the amount of shade over narrow ditches by managing adjacent hedgerows is also likely to increase the species diversity of plant and invertebrate communities within the ditch. We recommend that to preserve or enhance the

  7. NHDOT : process for municipally managed state aid highway program projects

    Science.gov (United States)

    2006-05-23

    The design and construction of Municipally Managed State Aid Highway Program projects must comply with the requirements in this guideline in order to receive State Aid under the applicable provisions of RSA 235. Under this process, State Aid Construc...

  8. 77 FR 55895 - Meeting: RTCA Program Management Committee (PMC)

    Science.gov (United States)

    2012-09-11

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Meeting: RTCA Program Management Committee (PMC) AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT...--Concept of Use for Aeronautical Information Services (AIS) and Meteorological (MET) Data Link Services...

  9. Managing Complex Programs in a Post-LSI Environment

    National Research Council Canada - National Science Library

    Mockensturm, Jeffery J

    2008-01-01

    .... External forces played a major role in the evolution of these practices: A defense procurement holiday throughout the 1990s significantly reduced defense procurement spending and commensurate programs to manage...

  10. Endangered Species. Management Improvements Could Enhance Recovery Program. Report to the Chairman, Subcommittee on Fisheries and Wildlife Conservation and the Environment, Committee on Merchant Marine and Fisheries, House of Representatives.

    Science.gov (United States)

    General Accounting Office, Washington, DC. Resources, Community, and Economic Development Div.

    Extinction of animal and plant species has become a serious problem that threatens to become more acute in coming years. The endangered species program was established to prevent further extinctions and ultimately recover species designated as threatened or endangered through the development and implementation of species recovery plans. Concerned…

  11. Cavity-Enhanced Raman Spectroscopy for Food Chain Management

    Directory of Open Access Journals (Sweden)

    Vincenz Sandfort

    2018-02-01

    Full Text Available Comprehensive food chain management requires the monitoring of many parameters including temperature, humidity, and multiple gases. The latter is highly challenging because no low-cost technology for the simultaneous chemical analysis of multiple gaseous components currently exists. This contribution proposes the use of cavity enhanced Raman spectroscopy to enable online monitoring of all relevant components using a single laser source. A laboratory scale setup is presented and characterized in detail. Power enhancement of the pump light is achieved in an optical resonator with a Finesse exceeding 2500. A simulation for the light scattering behavior shows the influence of polarization on the spatial distribution of the Raman scattered light. The setup is also used to measure three relevant showcase gases to demonstrate the feasibility of the approach, including carbon dioxide, oxygen and ethene.

  12. Remote sensing in operational range management programs in Western Canada

    Science.gov (United States)

    Thompson, M. D.

    1977-01-01

    A pilot program carried out in Western Canada to test remote sensing under semi-operational conditions and display its applicability to operational range management programs was described. Four agencies were involved in the program, two in Alberta and two in Manitoba. Each had different objectives and needs for remote sensing within its range management programs, and each was generally unfamiliar with remote sensing techniques and their applications. Personnel with experience and expertise in the remote sensing and range management fields worked with the agency personnel through every phase of the pilot program. Results indicate that these agencies have found remote sensing to be a cost effective tool and will begin to utilize remote sensing in their operational work during ensuing seasons.

  13. Radioactive Waste Management Fellowship Program: Summary of program activities for calendar year 1986

    International Nuclear Information System (INIS)

    1987-01-01

    This document describes a graduate fellowship program designed to guide future scientists and engineers toward a career in high level radioactive waste management. Oak Ridge Associated Universities administers this program on behalf of 17 participating universities. The report summarizes the background and qualifications of the last year's applicants and awardees and provides examples of the distributed literature describing the program. 8 figs

  14. 78 FR 60169 - Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee...

    Science.gov (United States)

    2013-09-30

    ... 9000-AM56 Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee... program enhancing whistleblower protections for contractor employees. DATES: Effective: September 30, 2013... contractor employees at FAR subpart 3.9. The pilot program is mandated by section 828, entitled ``Pilot...

  15. Cost benefit analysis of the demand side management programs

    International Nuclear Information System (INIS)

    Schechtman, R.; Baum, M.

    1989-01-01

    The several cost and benefit components of the demand side management programs for the society groups, including the concessionaire, consumers and society as a whole are studied. The rule evaluations of management programs by demand side, used by North American concessionaire are also discussed. Finally, the numerical examples, that consolidating the concepts and rules evaluation are presented. (C.G.C.). 5 refs, 1 fig, 3 tabs

  16. Configuration management program plan for Hanford site systems engineering

    International Nuclear Information System (INIS)

    Hoffman, A.G.

    1994-01-01

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline

  17. Major Management Challenges and Program Risks: Small Business Administration

    Science.gov (United States)

    2001-01-01

    2001 Major Management Challenges and Program Risks Small Business AdministrationGAO-01-260 Form SF298 Citation Data Report Date ("DD MON YYYY...34) 00JAN2001 Report Type N/A Dates Covered (from... to) ("DD MON YYYY") Title and Subtitle Major Management Challenges and Program Risks Small Business ...Administration (SBA) as it seeks to aid, counsel, assist, and protect the interests of the nations small businesses and help businesses and families

  18. Implementing a risk management program at Falconbridge

    International Nuclear Information System (INIS)

    Blechta, G.

    2003-01-01

    A corporate overview of Falconbridge was presented. Falconbridge, founded in 1928 is a leading producer of nickel, copper, cobalt and platinum group metals at low cost. A map displaying its worldwide locations was shown. In Canada, Falconbridge operates in Ontario and Nunavik Territory. The experience in Norway was briefly described, touching on market volatility, market intelligence, portfolio management, and risk management guidelines. The author then explained the purpose of the Energy Project Team, which was responsible for preparing for deregulation, developing strategies for purchasing energy, and minimizing the cost of purchased energy in a competitive market. The plan was described, and the emphasis placed on the core Ontario team. Communication played a large part. The management system functions were reviewed, and analysis provided. The financial integration model was presented. Risk management was dealt with, followed by market intelligence and operational hedge. Division impact was discussed. The major Falconbridge issues were: budget exposure to electricity price variability, how much fixed-price power supply and how long should the contracts be, regulatory structure, market purchase timing, and adhere to corporate risk management policy. The procurement process was described. The author concluded that the product must be kept simple and the number of products limited. A realistic schedule must by adhered to, and a short bidding period of four hours proved ideal. Supplier relationship must be consumer driven. The importance of communication plan was emphasized. Getting pre-approval to make the deal is important. tabs., figs

  19. Estimated emission reductions from California's enhanced Smog Check program.

    Science.gov (United States)

    Singer, Brett C; Wenzel, Thomas P

    2003-06-01

    The U.S. Environmental Protection Agency requires that states evaluate the effectiveness of their vehicle emissions inspection and maintenance (I/M) programs. This study demonstrates an evaluation approach that estimates mass emission reductions over time and includes the effect of I/M on vehicle deterioration. It includes a quantitative assessment of benefits from pre-inspection maintenance and repairs and accounts for the selection bias effect that occurs when intermittent high emitters are tested. We report estimates of one-cycle emission benefits of California's Enhanced Smog Check program, ca. 1999. Program benefits equivalent to metric tons per day of prevented emissions were calculated with a "bottom-up" approach that combined average per vehicle reductions in mass emission rates (g/gal) with average per vehicle activity, resolved by model year. Accelerated simulation mode test data from the statewide vehicle information database (VID) and from roadside Smog Check testing were used to determine 2-yr emission profiles of vehicles passing through Smog Check and infer emission profiles that would occur without Smog Check. The number of vehicles participating in Smog Check was also determined from the VID. We estimate that in 1999 Smog Check reduced tailpipe emissions of HC, CO, and NO(x) by 97, 1690, and 81 t/d, respectively. These correspond to 26, 34, and 14% of the HC, CO, and NO(x) that would have been emitted by vehicles in the absence of Smog Check. These estimates are highly sensitive to assumptions about vehicle deterioration in the absence of Smog Check. Considering the estimated uncertainty in these assumptions yields a range for calculated benefits: 46-128 t/d of HC, 860-2200 t/d of CO, and 60-91 t/d of NO(x). Repair of vehicles that failed an initial, official Smog Check appears to be the most important mechanism of emission reductions, but pre-inspection maintenance and repair also contributed substantially. Benefits from removal of nonpassing

  20. A fast-running fuel management program for a CANDU reactor

    International Nuclear Information System (INIS)

    Choi, Hangbok

    2000-01-01

    A fast-running fuel management program for a CANDU reactor has been developed. The basic principle of this program is to select refueling channels such that the reference reactor conditions are maintained by applying several constraints and criteria when selecting refueling channels. The constraints used in this program are the channel and bundle power and the fuel burnup. The final selection of the refueling channel is determined based on the priority of candidate channels, which enhances the reactor power distribution close to the time-average model. The refueling simulation was performed for a natural uranium CANDU reactor and the results were satisfactory

  1. Civilian radioactive waste management program plan. Revision 2

    International Nuclear Information System (INIS)

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy's site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program's ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program's mission and vision, and summarizes the Program's broad strategic objectives. Chapter 2 describes the Program's approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program's organization chart; the Commission's regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms

  2. Analysis of Privacy-Enhancing Identity Management Systems

    DEFF Research Database (Denmark)

    Adjei, Joseph K.; Olesen, Henning

    Privacy has become a major issue for policy makers. This has been impelled by the rapid development of technologies that facilitate collection, distribution, storage, and manipulation of personal information. Business organizations are finding new ways of leveraging the value derived from consumer...... is an attempt to understand the relationship between individuals’ intentions to disclose personal information, their actual personal information disclosure behaviours, and how these can be leveraged to develop privacy-enhancing identity management systems (IDMS) that users can trust. Legal, regulatory...... and technological aspects of privacy and technology adoption are also discussed....

  3. A couples’ based self-management program for heart failure: Results of a feasibility study

    Directory of Open Access Journals (Sweden)

    Ranak Trivedi

    2016-08-01

    Full Text Available Background: Heart failure (HF is associated with frequent exacerbations and shortened lifespan. Informal caregivers such as significant others often support self-management in patients with HF. However, existing programs that aim to enhance self-management seldom engage informal caregivers or provide tools that can help alleviate caregiver burden or improve collaboration between patients and their informal caregivers. Objective: To develop and pilot test a program targeting the needs of self-management support among HF patients as well as their significant others. Methods: We developed the Dyadic Health Behavior Change model and conducted semi-structured interviews to determine barriers to self-management from various perspectives. Participants’ feedback was used to develop a family-centered self-management program called SUCCEED: Self-management Using Couples’ Coping EnhancEment in Diseases. The goals of this program are to improve HF self-management, quality of life, communication within couples, relationship quality, and stress and caregiver burden. We conducted a pilot study with 17 Veterans with HF and their significant others to determine acceptability of the program. We piloted psychosocial surveys at baseline and after participants’ program completion to evaluate change in depressive symptoms, caregiver burden, self-management of HF, communication, quality of relationship, relationship mutuality, and quality of life. Results: Of the 17 couples, 14 completed at least 1 SUCCEED session. Results showed high acceptability for each of SUCCEED’s sessions. At baseline, patients reported poor quality of life, clinically significant depressive symptoms, and inadequate self-management of HF. After participating in SUCCEED, patients showed improvements in self-management of HF, communication, and relationship quality, while caregivers reported improvements in depressive symptoms and caregiver burden. Quality of life of both patients and

  4. Fleet wide motor asset management program

    International Nuclear Information System (INIS)

    Rosemeier, R.G.; Moxie, J.J.; Mendez, W.E.

    2011-01-01

    The Institute of Nuclear Power Operations (INPO) performed several studies concerning the effects of motor failures on US power production. Problems with aging and the lack of preventative maintenance were noted as major contributors to this production loss. Westinghouse has developed, and successfully utilized, a computer program to assist plants in the decision making process for maximizing the operational availability of their motor fleet. The program considers motors of a fleet as a single, critical to production asset, and aids the operator in decisions regarding the following: 1.) Purchase of spares. 2.) Rewind and refurbishment prioritization. 3.) Long-term budget forecasting. (author)

  5. NOSC Program Managers Handbook. Revision 1

    Science.gov (United States)

    1988-02-01

    or creating the appearance of -Using government position for private gain -Giving preferential treatment to persons or organizations -Impeding...8217.3. us d a A c f z Z 3 Zus. W-C 0 0 Z 0~c C. 2 U ca6 4 lie4 Zfe x 0- e, N W w- -3W "Z I N, WISP . -.. -W 23 -0 01 S. 0 X 2 -CNLIZ p4 p4 A-0 .30 -- c...engineering art and a management discipline. This module for project managers is a concise treatment , which only touches on the key topics and issues, of

  6. An enhanced data-analytic framework for integrating risk management and performance management

    International Nuclear Information System (INIS)

    Thekdi, Shital; Aven, Terje

    2016-01-01

    There is increasing interest for agencies and industries to develop risk management processes for a wide variety of applications. Traditional risk management processes are motivated by controlling risk and avoiding losses. In contrast, other organizational processes focus on managing performance and value generation. In this paper we argue that risk management also adds an important contribution to these processes. However, this requires “proper” risk management extending beyond narrow safety oriented perspectives built on quantitative risk analysis and tolerability/acceptance criteria. There is need for a broad risk-performance framework with uncertainty being a main component of risk, and where knowledge and surprises are adequately reflected. In the paper we present and discuss such a framework. The framework is developed on the basis of an analysis of combinations of different risk management and performance management practices/policies. We show how the risk and performance management processes can be improved by proper risk conceptualization and a holistic thinking on how to develop and use goals in the organization, how to balance different concerns, and consider the need for agility – “sensitivity to operations”, as well as how to give weight to vulnerabilities, resilience, and antifragility. - Highlights: • We relate key performance management and risk management principles. • We propose an enhanced framework to unify thinking of performance and risk. • We apply the framework to a public-private partnership case study.

  7. Strategies in disability management. Corporate disability management programs implemented at the work site.

    Science.gov (United States)

    Kalina, C M

    1999-10-30

    Managers are challenged to demonstrate all programs as economically essential to the business, generating an appreciable return on investment. Further challenge exists to blend and integrate clinical and business objectives in program development. Disability management programs must be viewed as economically essential to the financial success of the business to assure management support for clinical interventions and return-to-work strategies essential for a successful program. This paper discusses a disability management program integrating clinical and business goals and objectives in return-to-work strategies to effect positive clinical, social-cultural, and business results. Clinical, educational, social, and economic challenges in the development, implementation, and continued management of a disability program at a large corporation with multiple global work sites are defined. Continued discussion addresses the effective clinical interventions and educational strategies utilized successfully within the workplace environment in response to each defined challenge. A multiple disciplinary team approach, clinical and business outcome measures, and quality assurance indicators are discussed as major program components. This article discusses a successful program approach focusing on business process and methodology. These parameters are used to link resources to strategy, developing a product for implementing and managing a program demonstrating economic value added through effective clinical medical case management.

  8. 75 FR 60398 - California: Proposed Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2010-09-30

    ...: Proposed Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... its hazardous waste management program by November 1, 2010. ADDRESSES: Submit your comments... waste management program. EPA continues to have independent enforcement authority under RCRA sections...

  9. 77 FR 15273 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2012-03-15

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... hazardous waste management program. We authorized the following revisions: Oklahoma received authorization... its program revision in accordance with 40 CFR 271.21. The Oklahoma Hazardous Waste Management Act...

  10. UMTRA Project Administrative Files Collection Records Management Program

    International Nuclear Information System (INIS)

    1994-09-01

    The UPAFC Records Management Plan is based on the life cycle of a record - the evolution of a record from creation until final disposition. There are three major phases in the life cycle of a record: (1) creation and receipt, (2) maintenance and use, and (3) disposition. Accordingly, the Records Management Plan is structured to follow each of those phases. During each of the three phases, some kind of control is mandatory. The Records Management Plan establishes appropriate standards, policies, and procedures to ensure adequate control is always maintained. It includes a plan for records management, a plan for records management training activities, and a plan for auditing and appraising the program

  11. Knowledge Management for Enhancing Regulatory Body Capabilities in Thailand

    International Nuclear Information System (INIS)

    Apichaibukol, A.; Pakdee, K.

    2016-01-01

    Full text: In order to be a learning organization, the Office of Atoms for Peace (OAP) has appointed a knowledge-management team in an attempt to manage internal knowledge, both tacit knowledge and explicit knowledge, systematically. In principle, the seven steps of knowledge management will be applied for OAP KM, namely; 1. Knowledge identification including the knowledge required of the Regulatory Body. 2. Knowledge creation and acquisition including knowledge sharing, transfer and how to maintain knowledge external factors such as a customers, stakeholder, etc. 3. Knowledge organization based on knowledge structure is needed for a systematic knowledge retention in the future. 4. Knowledge refinement with ISO standards in document storage. 5. Knowledge access for example, using information technology management through web board. 6. Knowledge sharing, OAP staff through numerous methods designed to transfer implicit and tacit knowledge such as formal classroom and on-the-job training, informal Communities of Practice, mentoring. 7. Learning is OAP group continually enhancing their capabilities and making decisions, solving problems and improving the organization. OAP staff could apply knowledge for organization development and planning for a supporting guideline. (author

  12. Managing an "Organistically-Oriented" School Intervention Program.

    Science.gov (United States)

    Barrilleaux, Louis E.; Schermerhorn, John R., Jr.

    An "organic" relationship between change agents and clients is a well-popularized goal in recent literature on planned change and organization development. There is, however, a dearth of literature on how to manage change programs under parameters set by this organic value. This paper examines one school organization development program for the…

  13. A Perspective on a Management Information Systems (MIS) Program Review

    Science.gov (United States)

    Yew, Bee K.

    2008-01-01

    This paper highlights relevant curriculum issues that were identified in a Management Information Systems (MIS) program review undertaken by a group of business faculty in a small regional university. The program review was initiated to improve job marketability of graduates and student enrollment. The review process is described as a collective…

  14. Resource values in analyzing fire management programs for economic efficiency

    Science.gov (United States)

    Irene A. Althaus; Thomas J. Mills

    1982-01-01

    In analyzing fire management programs for their economic efficiency, it is necessary to assign monetary values to the changes in resource outputs caused by, fire. The derivation of resource values is complicated by imperfect or nonexistent commercial market structures. The valuation concept recommended for fire program analyses is willingness-to-pay because it permits...

  15. Risk Management and Litigation Avoidance in Outdoor Recreation Programming.

    Science.gov (United States)

    Hanna, Glenda

    This paper reviews aspects of Canadian and U.S. law related to liability and negligence of outdoor programs and suggests strategies for risk management. To prove negligence, an individual injured in an outdoor program must prove that the outdoor leader had a duty of care to the participant, standards of care were breached, actual injury was…

  16. Strategic Human Resources Management of Employer Cooperative Education Programs.

    Science.gov (United States)

    Nielsen, Richard P.; Porter, Ralph C.

    1982-01-01

    This article discusses effective strategic planning and management of employer cooperative education programs. It examines types of planning, the need for such programs, and implementation strategies. Several case studies are considered: Dayton-Hudson, IBM, AT&T, Delta Airlines, and Rockwell International. (CT)

  17. An Evaluation of CHAMPS: A Classroom Management Program

    Science.gov (United States)

    Minnear, Holly J.

    2015-01-01

    This dissertation was designed to examine the impact of Conversation, Help, Activity, Movement, Participation, Success (CHAMPS), a classroom management program in elementary schools in a district in North Carolina. The participants included principals and teachers who attended a 2-day training course and implemented the CHAMPS program at their…

  18. Developing fire management mixes for fire program planning

    Science.gov (United States)

    Armando González-Cabán; Patricia B. Shinkle; Thomas J. Mills

    1986-01-01

    Evaluating economic efficiency of fire management program options requires information on the firefighting inputs, such as vehicles and crews, that would be needed to execute the program option selected. An algorithm was developed to translate automatically dollars allocated to type of firefighting inputs to numbers of units, using a set of weights for a specific fire...

  19. Directory of Instructional Programs in Supervision and Management Training.

    Science.gov (United States)

    Civil Service Commission, Washington, DC. Training Assistance Div.

    This directory, which is designed for the use of training officers in the Washington, D.C. area in prescribing learning programs to meet employee training needs, describes available group and self instructional programs used for the training of supervisors and managers. Each of the 21 courses listed contains the pertinent information necessary to…

  20. Core TuLiP - Logic Programming for Trust Management

    NARCIS (Netherlands)

    Czenko, M.R.; Etalle, Sandro; Dahl, V.; Niemelä, I.

    2007-01-01

    We propose CoreTuLiP - the core of a trust management language based on Logic Programming. CoreTuLiP is based on a subset of moded logic programming, but enjoys the features of TM languages such as RT; in particular clauses are issued by different authorities and stored in a distributed manner. We

  1. Outcomes Assessment in Accredited Health Information Management Programs

    Science.gov (United States)

    Bennett, Dorine

    2010-01-01

    The purpose of this study was to determine the use and perceived usefulness of outcomes assessment methods in health information management programs. Additional characteristics of the outcomes assessment practices were recognized. The findings were evaluated for significant differences in results based on age of the program, type of institution,…

  2. Waste Management Program: Technical progress report, July-December 1985

    International Nuclear Information System (INIS)

    1987-12-01

    This report provides information on operations and development programs relating to the management of radioactive wastes at the Savannah River Plant. Information on environmental and safety assessments, waste form development, and process and equipment development are reported for long-term waste management. 13 refs., 20 figs., 16 tabs

  3. Small Business Management Volume III: Curriculum. An Adult Education Program.

    Science.gov (United States)

    Persons, Edgar A.; Swanson, Gordon I.

    The small business management adult education program outlined in this curriculum guide is designed to help small business entrepreneurs solve their business management problems and attain the goals they have established for their businesses and their families. (An instructor's manual and practice problems are in separate volumes.) The 3-year…

  4. Sustainable Supply Chain Management Programs in the 21st Century

    Science.gov (United States)

    Neureuther, Brian D.; O'Neill, Kevin

    2011-01-01

    One of the most difficult challenges for an undergraduate supply chain management program at smaller universities is to create an environment of sustainability. Supply chain management is not at the tip of tongue for many graduating high school students and few undergraduate curriculums require a course in the content area. This research addresses…

  5. Waste Management Program: Technical progress report, January-June 1985

    International Nuclear Information System (INIS)

    1987-12-01

    This report provides information on operations and development programs relating to the management of radioactive wastes at the Savannah River Plant. Information on environmental and safety assessments, waste form development, and process and equipment development are reported for long-term waste management. 35 refs., 12 figs., 8 tabs

  6. Public participation in UMTRA Project program management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    Innovative techniques for overcoming barriers to public participation on the US Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project have led to improved communications with stakeholders at project sites and improved communications within the project. On the UMTRA Project, it's been shown that an effective public participation program is an essential element to successful project implementation

  7. The Westinghouse Waste Isolation Division Management and Supervisor Training Program

    International Nuclear Information System (INIS)

    Gilbreath, B.

    1992-01-01

    The Westinghouse Waste Isolation Division (WID) is the management and operating contractor (MOC) for the Department of Energy's (DOE's) Waste Isolation Plant (WIPP). Managers and supervisors at DOE facilities such as the WIPP are required to complete extensive training. To meet this requirement, WID created a self-paced, self-study program known as Management and Supervisor Training (MAST). All WID managers and supervisors are required to earn certification through the MAST program. Selected employees are permitted to participate in MAST with prior approval from their manager and the Human Resources Manager. Initial MAST certification requires the completion of 31 modules. MAST participants check out modules and read them when convenient. When they are prepared, participants take module examinations. To receive credit for a given module, participants must score at least 80 percent on the examination. Lessons learned from the development, implementation, and administration are presented in this paper

  8. DOE reassesses civilian radioactive waste management program

    International Nuclear Information System (INIS)

    Yates, M.

    1990-01-01

    This article reports on the announcement by the Department of Energy (DOE) that the opening of a high-level radioactive nuclear waste repository site will be delayed for seven years. The article discusses DOE's reassessment plan, the restructuring of the Office of Civilian Radioactive Waste Management, site access and evaluation, the Monitored Retrievable Storage Commission proposal, and the industry's response

  9. Land Use Management for Solid Waste Programs

    Science.gov (United States)

    Brown, Sanford M., Jr.

    1974-01-01

    The author discusses the problems of solid waste disposal and examines various land use management techniques. These include the land use plan, zoning, regionalization, land utilities, and interim use. Information concerning solid waste processing site zoning and analysis is given. Bibliography included. (MA)

  10. School District Cash Management. Program Audit.

    Science.gov (United States)

    New York State Legislative Commission on Expenditure Review, Albany.

    New York State law permits school districts to invest cash not immediately needed for district operation and also specifies the kinds of investments that may be made in order to ensure the safety and liquidity of public funds. This audit examines cash management and investment practices in New York state's financially independent school districts.…

  11. French programs for advanced waste management options

    Energy Technology Data Exchange (ETDEWEB)

    Salvatores, M [CEA-DRN (France); Schapira, J P [CNRS-IN2P3 (France); Mouney, H [EDF-DE (France)

    1997-11-01

    Several organisms (CEA, CNRS, EdF, etc.) are cooperating in France on Accelerator-Driven Systems (ADS). The major motivation is the investigation of innovative options for the radioactive waste management. The paper describes the ongoing activities and future directions of this cooperative effort in the field of ADS. 11 refs, 3 figs.

  12. Disease Management, Case Management, Care Management, and Care Coordination: A Framework and a Brief Manual for Care Programs and Staff.

    Science.gov (United States)

    Ahmed, Osman I

    2016-01-01

    With the changing landscape of health care delivery in the United States since the passage of the Patient Protection and Affordable Care Act in 2010, health care organizations have struggled to keep pace with the evolving paradigm, particularly as it pertains to population health management. New nomenclature emerged to describe components of the new environment, and familiar words were put to use in an entirely different context. This article proposes a working framework for activities performed in case management, disease management, care management, and care coordination. The author offers standard working definitions for some of the most frequently used words in the health care industry with the goal of increasing consistency for their use, especially in the backdrop of the Centers for Medicaid & Medicare Services offering a "chronic case management fee" to primary care providers for managing the sickest, high-cost Medicare patients. Health care organizations performing case management, care management, disease management, and care coordination. Road map for consistency among users, in reporting, comparison, and for success of care management/coordination programs. This article offers a working framework for disease managers, case and care managers, and care coordinators. It suggests standard definitions to use for disease management, case management, care management, and care coordination. Moreover, the use of clear terminology will facilitate comparing, contrasting, and evaluating all care programs and increase consistency. The article can improve understanding of care program components and success factors, estimate program value and effectiveness, heighten awareness of consumer engagement tools, recognize current state and challenges for care programs, understand the role of health information technology solutions in care programs, and use information and knowledge gained to assess and improve care programs to design the "next generation" of programs.

  13. Status of the Canadian Nuclear Fuel Waste Management Program

    International Nuclear Information System (INIS)

    Lyon, R.B.

    1985-10-01

    The Canadian Nuclear Fuel Waste Management Program is in the fifth year of a ten-year generic research and development phase. The major objective of this phase of the program is to assess the basic safety and environmental aspects of the concept of isolating immobilized fuel waste by deep underground disposal in plutonic rock. The major scientific and engineering components of the program, namely immobilization studies, geoscience research, and environmental and safety assessment, are well established

  14. Enhancing the effectiveness of diabetes self-management education: the diabetes literacy project.

    Science.gov (United States)

    Van den Broucke, S; Van der Zanden, G; Chang, P; Doyle, G; Levin, D; Pelikan, J; Schillinger, D; Schwarz, P; Sørensen, K; Yardley, L; Riemenschneider, H

    2014-12-01

    Patient empowerment through self-management education is central to improving the quality of diabetes care and preventing Type 2 Diabetes. Although national programs exist, there is no EU-wide strategy for diabetes self-management education, and patients with limited literacy face barriers to effective self-management. The Diabetes Literacy project, initiated with the support of the European Commission, aims to fill this gap. The project investigates the effectiveness of diabetes self-management education, targeting people with or at risk of Type 2 Diabetes in the 28 EU Member States, as part of a comprehensive EU-wide diabetes strategy. National diabetes strategies in the EU, US, Taiwan, and Israel are compared, and diabetes self-management programs inventorized. The costs of the diabetes care pathway are assessed on a per person basis at national level. A comparison is made of the (cost)-effectiveness of different methods for diabetes self-management support, and the moderating role of health literacy, organization of the health services, and implementation fidelity of education programs are considered. Web-based materials are developed and evaluated by randomized trials to evaluate if interactive internet delivery can enhance self-management support for people with lower levels of health literacy. The 3-year project started in December 2012. Several literature reviews have been produced and protocol development and research design are in the final stages. Primary and secondary data collection and analysis take place in 2014. The results will inform policy decisions on improving the prevention, treatment, and care for persons with diabetes across literacy levels. © Georg Thieme Verlag KG Stuttgart · New York.

  15. Management. Program CIP: Business Management: 52.0204

    Science.gov (United States)

    Murdock, Ashleigh Barbee, Ed.

    2008-01-01

    Secondary career-technical education programs in Mississippi are faced with many challenges resulting from sweeping educational reforms at the national and state levels. Schools and teachers are increasingly being held accountable for providing true learning activities to every student in the classroom. This accountability is measured through…

  16. 2008 Federal Energy Management Program (FEMP) Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Tremper, C.

    2009-07-01

    This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

  17. Do Pain Medicine Fellowship Programs Provide Education in Practice Management? A Survey of Pain Medicine Fellowship Programs.

    Science.gov (United States)

    Przkora, Rene; Antony, Ajay; McNeil, Andrew; Brenner, Gary J; Mesrobian, James; Rosenquist, Richard; Abouleish, Amr E

    2018-01-01

    We hypothesized that there is a gap between expectations and actual training in practice management for pain medicine fellows. Our impression is that many fellowships rely on residency training to provide exposure to business education. Unfortunately, pain management and anesthesiology business education are very different, as the practice settings are largely office- versus hospital-based, respectively. Because it is unclear whether pain management fellowships are providing practice management education and, if they do, whether the topics covered match the expectations of their fellows, we surveyed pain medicine program directors and fellows regarding their expectations and training in business management. A survey. Academic pain medicine fellowship programs. After an exemption was obtained from the University of Texas Medical Branch Institutional Review Board (#13-030), an email survey was sent to members of the Association of Pain Program Directors to be forwarded to their fellows. Directors were contacted 3 times to maximize the response rate. The anonymous survey for fellows contained 21 questions (questions are shown in the results). Fifty-nine of 84 program directors responded and forwarded the survey to their fellows. Sixty fellows responded, with 56 answering the survey questions. The responder rate is a limitation, although similar rates have been reported in similar studies. The majority of pain medicine fellows receive some practice management training, mainly on billing documentation and preauthorization processes, while most do not receive business education (e.g., human resources, contracts, accounting/financial reports). More than 70% of fellows reported that they receive more business education from industry than from their fellowships, a result that may raise concerns about the independence of our future physicians from the industry. Our findings support the need for enhanced and structured business education during pain fellowship. Business

  18. Enhanced Key Management Protocols for Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Baojiang Cui

    2015-01-01

    Full Text Available With rapid development and extensive use of wireless sensor networks (WSNs, it is urgent to enhance the security for WSNs, in which key management is an effective way to protect WSNs from various attacks. However, different types of messages exchanged in WSNs typically have different security requirements which cannot be satisfied by a single keying mechanism. In this study, a basic key management protocol is described for WSNs based on four kinds of keys, which can be derived from an initial master key, and an enhanced protocol is proposed based on Diffie-Hellman algorithm. The proposed scheme restricts the adverse security impact of a captured node to the rest of WSNs and meets the requirement of energy efficiency by supporting in-network processing. The master key protection, key revocation mechanism, and the authentication mechanism based on one-way hash function are, respectively, discussed. Finally, the performance of the proposed scheme is analyzed from the aspects of computational efficiency, storage requirement and communication cost, and its antiattack capability in protecting WSNs is discussed under various attack models. In this paper, promising research directions are also discussed.

  19. 78 FR 25678 - Georgia: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-05-02

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... Gwendolyn Gleaton, Permits and State Programs Section, RCRA Programs and Materials Management Branch, RCRA...

  20. Waste Management Program. Technical progress report, July-December, 1984

    International Nuclear Information System (INIS)

    1986-10-01

    This report provides information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, other support, in situ storage or disposal, waste form development and characterization, process and equipment development, and the Defense Waste Processing Facility are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations: tank farm operation, inspection program, burial ground operations, and waste transfer/tank replacement

  1. Waste Management Program. Technical progress report, Aporil-June 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-02-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant. The studies on environmental and safety assessments, process and equipment development, TRU waste, and low-level waste are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  2. First German disease management program for breast cancer.

    Science.gov (United States)

    Rupprecht, Christoph

    2005-01-01

    The first disease management program contract for breast cancer in Germany was signed in 2002 between the Association of Regional of Physicians in North-Rhine and the statutory health insurance companies in Rhineland. At the heart of this unique breast cancer disease management program is a patient-centered network of health care professionals. The program's main objectives are: (1) to improve the quality of treatment and post-operative care for breast cancer patients, (2) to provide timely information and consultation empowering the patient to participate in decisionmaking, (3) to improve the interface between inpatient and outpatient care, and (4) to increase the number of breast-conserving surgeries.

  3. EMSC program manager survey on education of prehospital providers.

    Science.gov (United States)

    Ngo, Thuy L; Belli, Karen; Shah, Manish I

    2014-01-01

    Although pediatric-specific objectives for the initial education of prehospital providers have been established, uniform implementation of these objectives and guidelines for hours of required pediatric continuing education (CE) for prehospital providers have not been established. To examine the content and number of hours of pediatric-specific education that prehospital providers receive during initial certification and recertification. Second, to identify barriers to implementing specific requirements for pediatric education of prehospital providers. Electronic surveys were sent to 55 EMS for Children (EMSC) State Partnership grantee program managers inquiring about the certification and recertification processes of prehospital providers and barriers to receiving pediatric training in each jurisdiction. We had a 91% response rate for our survey. Specified pediatric education hours exist in more states and territories for recertification (63-67%) than initial certification (41%). Limitations in funding, time, instructors, and accessibility are barriers to enhancing pediatric education. Modifying statewide policies on prehospital education and increasing hands-on training may overcome identified barriers.

  4. Benchmarking processes for managing large international space programs

    Science.gov (United States)

    Mandell, Humboldt C., Jr.; Duke, Michael B.

    1993-01-01

    The relationship between management style and program costs is analyzed to determine the feasibility of financing large international space missions. The incorporation of management systems is considered to be essential to realizing low cost spacecraft and planetary surface systems. Several companies ranging from large Lockheed 'Skunk Works' to small companies including Space Industries, Inc., Rocket Research Corp., and Orbital Sciences Corp. were studied. It is concluded that to lower the prices, the ways in which spacecraft and hardware are developed must be changed. Benchmarking of successful low cost space programs has revealed a number of prescriptive rules for low cost managements, including major changes in the relationships between the public and private sectors.

  5. The Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Dormuth, K.W.; Nuttall, K.

    1987-01-01

    Canada has established an extensive research program to develop and demonstrate the technology for safely disposing of nuclear fuel waste from Canadian nuclear electric generating stations. The program focuses on the concept of disposal deep in plutonic rock, which is abundant in the province of Ontario, Canada's major producer of nuclear electricity. Research is carried out at field research areas in the Canadian Precambrian Shield, and in government and university laboratories. The schedule calls for a document assessing the disposal concept to be submitted to regulatory and environmental agencies in late 1988. This document will form the basis for a review of the concept by these agencies and by the public. No site selection will be carried out before this review is completed. 10 refs.; 2 figs

  6. Integrating Cybersecurity into the Program Management Organization

    Science.gov (United States)

    2015-05-13

    penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 13 MAY 2015 2...Threat to our National Economy DOD Cybersecurity Gaps Could Be Canary in Federal Acquisition Coal Mine Intangible Assets Create Vulnerabilities...operational approach integrates with current or planned CONOPS, BCP, information architecture, programs or initiatives Development  Approach to

  7. Status of ageing management program for HANARO

    International Nuclear Information System (INIS)

    Kim, Sang-Jin; Shin, Jin-Won; Kim, Hyung-Kyoo; Jung, Hoan-Sung

    2012-01-01

    HANARO is a 30 MW open pool type research reactor which has been operated for 16 years since its initial criticality in February 1995. It has been used for nuclear material testing, radioisotope production, neutron transmutation doping, nuclear activation analysis, and neutron scattering experiments. Recently, new facilities such as FTL (Fuel Transfer Loop) and CNS (Cold Neutron Source) were installed in the reactor. HANARO was originally designed to operate for at least 20 years under full power operating condition, but the actual life time is expected to be much more than the design lifetime by supporting with a safety reassessment based on realistic data and maintenance activities for an ageing management. The conducted inspections, maintenance activities, and the future plan of the ageing management for HANARO are presented in this paper. (author)

  8. Building a novel inpatient diabetes management mentor program: a blueprint for success.

    Science.gov (United States)

    Modic, Mary Beth; Sauvey, Rebecca; Canfield, Christina; Kukla, Aniko; Kaser, Nancy; Modic, Joselyn; Yager, Christina

    2013-01-01

    The intent of this project was to create a formalized educational program for bedside nurses responsible for inpatient diabetes management. Bedside nurses are recruited to serve as diabetes management mentors. The mentors receive advanced education concerning teaching and learning principles, the AADE7™ Self-Care Behaviors, and diabetes management strategies. They teach their peers, advocate for patients, and facilitate referrals for outpatient Diabetes Self-Management Education (DSME) programs. The focus of these ongoing educational activities is to foster the development of diabetes management mentors and to create teaching tools that mentors can use with peers to address practice gaps or skill deficiencies. The diabetes management mentor is integral in enhancing the care of patients with diabetes in the hospital. The empowerment of bedside nurses as mentors for their peers and their patients is an invaluable asset that helps nurses take ownership of their practice. This role could be applied to other complex disease entities, helping nurses to develop specific management skills to improve patient outcomes and enhance patient satisfaction.

  9. Asset liability management using stochastic programming

    OpenAIRE

    Pirbhai, M; Mitra, G; Kyriakis, T

    2003-01-01

    This chapter sets out to explain an important financial planning model called asset liability management (ALM); in particular, it discusses why in practice, optimum planning models are used. The ability to build an integrated approach that combines liability models with that of asset allocation decisions has proved to be desirable and more efficient in that it can lead to better ALM decisions. The role of uncertainty and quantification of risk in these planning models is con...

  10. Buildings energy management program workshop design. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-12-01

    This document describes activities undertaken by Honeywell's Energy Resources Center for design and development of the format, content, and materials that were used in conducting 129 one-day energy management workshops for specific commercial business audiences. The Building Energy Management Workshop Program was part of a National Workshop Program that was intended to increase awareness of energy-related issues and to encourage energy-conservation actions on the part of commercial and industrial sectors. The total effort included executive conferences for chief executive officers and other senior management personnel; industrial energy-conservation workshops directed at plant management and engineering personnel; vanpooling workshops designed to inform and encourage business in implementing a vanpooling program for employees; and the building energy-management workshops specifically developed for managers, owners, and operators of office and retail facilities, restaurants, and supermarkets. The total program spanned nearly two years and reached approximately 2,500 participants from all parts of the U.S. A detailed followup evaluation is still being conducted to determine the impact of this program in terms of conservation action undertaken by workshop participants.

  11. Practical examples of how knowledge management is addressed in Point Lepreau heat transport ageing management programs

    International Nuclear Information System (INIS)

    Slade, J.; Gendron, T.; Greenlaw, G.

    2009-01-01

    In the mid-1990s, New Brunswick Power Nuclear implemented a Management System Process Model at the Point Lepreau Generating Station that provides the basic elements of a knowledge management program. As noted by the IAEA, the challenge facing the nuclear industry now is to make improvements in knowledge management in areas that are more difficult to implement. Two of these areas are: increasing the value of existing knowledge, and converting tacit knowledge to explicit knowledge (knowledge acquisition). This paper describes some practical examples of knowledge management improvements in the Point Lepreau heat transport system ageing management program. (author)

  12. Lean process management implementation through enhanced problem solving capabilities

    Directory of Open Access Journals (Sweden)

    Perumal Puvanasvaran

    2010-12-01

    Full Text Available All Original Equipment Manufacturers (OEM organizations in Aerospace, Automotive and Electronics industries had to upgrade their functions. These organizations including suppliers and solutions providers are duty bound to improve their functions through strategic initiatives. One such initiative is Lean Process Management. Lean Process Management has proven to aid organizations in developing manufacturing and administrative management solutions and make the organization a leaner at the same time a ‘fitter’ one, achieving World Class standards in terms of production, quality, marketing, etc, etc. The issue or problem is, although a number of authors, experts, researchers have discussed the lean process management as part organization centric issues, they failed to provide an effective lean process management system. Besides the need to formulate an effective lean process as suggested by some authors, another important reason suggested is the employee’s development aspect regarding how to unlock the infinite potential of their workforce. This employee’s development is basically the problem solving capabilities of the employees while implementing the Lean through clear cutting protocols or processes of Lean Process Management. The employees need to be developed and equipped to contribute optimally to the process. Because of this scenario, the main objective of this study is to develop an employees development system which the author has acronym or trademark it as People Development System (PDS to enhance problem solving capability among its employees while implementing the lean process management there. Although, the PDS can be implemented throughout the organization, if it is implemented in a particular department in an organization, it will be feasible to study and analyze its effectiveness in-depth. So, this study documents and analyzes the implementation of Lean process in the Kitting Department of the aerospace company, ABC Company

  13. EPRI'S low-level waste management R ampersand D program

    International Nuclear Information System (INIS)

    Hornibrook, C.

    1997-01-01

    The immediate challenges facing every organization today are to improve its productivity and increase customer satisfaction. The Electric Power Research Institute (EPRI) responded to this challenge by broadening the scope of its low-level waste (LLW) management program. EPRI offered utilities on-site assistance in evaluating and optimizing their liquid- and solid-waste management programs. The goal is to identify open-quotes cheaper, better, and easierclose quotes solutions, which are documented in a series of reports. These provide step-by-step evaluation processes and straightforward implementation methods. Utility professionals are provided with the necessary technical information and justification for informed waste management decisions. The resulting average annual savings is consistently in excess of $700,000 per facility. The program continues to grow and serves as a model for a number of existing and emerging EPRI programs

  14. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Science.gov (United States)

    2010-04-01

    ... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge... 25 Indians 1 2010-04-01 2010-04-01 false Are management systems required for the IRR Program? 170... Program Reviews and Management Systems § 170.502 Are management systems required for the IRR Program? (a...

  15. Review of current Southern California edison load management programs and proposal for a new market-driven, mass-market, demand-response program

    Energy Technology Data Exchange (ETDEWEB)

    Weller, G.H.

    2002-01-01

    Utility load management programs, including direct load control and interruptible load programs, constitute a large installed base of controllable loads that are employed by utilities as system reliability resources. In response to energy supply shortfalls expected during the summer of 2001, the California Public Utilities Commission in spring 2001 authorized new utility load management programs as well as revisions to existing programs. This report provides an independent review of the designs of these new programs for a large utility (Southern California Edison) and suggests possible improvements to enhance the price responsiveness of the customer actions influenced by these programs. The report also proposes a new program to elicit a mass-market demand response to utility price signals.

  16. Building capacity for HIV/AIDS program leadership and management in Uganda through mentored Fellowships.

    Science.gov (United States)

    Matovu, Joseph K B; Wanyenze, Rhoda K; Mawemuko, Susan; Wamuyu-Maina, Gakenia; Bazeyo, William; Olico-Okui; Serwadda, David

    2011-02-24

    Around the world, health professionals and program managers are leading and managing public and private health organizations with little or no formal management and leadership training and experience. To describe an innovative 2-year, long-term apprenticeship Fellowship training program implemented by Makerere University School of Public Health (MakSPH) to strengthen capacity for leadership and management of HIV/AIDS programs in Uganda. IMPLEMENTATION PROCESS: The program, which began in 2002, is a 2-year, full-time, non-degree Fellowship. It is open to Ugandan nationals with postgraduate training in health-related disciplines. Enrolled Fellows are attached to host institutions implementing HIV/AIDS programs and placed under the supervision of host institution and academic mentors. Fellows spend 75% of their apprenticeship at the host institutions while the remaining 25% is dedicated to didactic short courses conducted at MakSPH to enhance their knowledge base. Overall, 77 Fellows have been enrolled since 2002. Of the 57 Fellows who were admitted between 2002 and 2008, 94.7% (54) completed the Fellowship successfully and 50 (92.3%) are employed in senior leadership and management positions in Uganda and internationally. Eighty-eight percent of those employed (44/54) work in institutions registered in Uganda, indicating a high level of in-country retention. Nineteen of the 20 Fellows who were admitted between 2009 and 2010 are still undergoing training. A total of 67 institutions have hosted Fellows since 2002. The host institutions have benefited through staff training and technical expertise from the Fellows as well as through grant support to Fellows to develop and implement innovative pilot projects. The success of the program hinges on support from mentors, stakeholder involvement, and the hands-on approach employed in training. The Fellowship Program offers a unique opportunity for hands-on training in HIV/AIDS program leadership and management for both

  17. Building capacity for HIV/AIDS program leadership and management in Uganda through mentored Fellowships

    Directory of Open Access Journals (Sweden)

    Joseph K.B. Matovu

    2011-02-01

    Full Text Available Background: Around the world, health professionals and program managers are leading and managing public and private health organizations with little or no formal management and leadership training and experience. Objective: To describe an innovative 2-year, long-term apprenticeship Fellowship training program implemented by Makerere University School of Public Health (MakSPH to strengthen capacity for leadership and management of HIV/AIDS programs in Uganda. Implementation process: The program, which began in 2002, is a 2-year, full-time, non-degree Fellowship. It is open to Ugandan nationals with postgraduate training in health-related disciplines. Enrolled Fellows are attached to host institutions implementing HIV/AIDS programs and placed under the supervision of host institution and academic mentors. Fellows spend 75% of their apprenticeship at the host institutions while the remaining 25% is dedicated to didactic short courses conducted at MakSPH to enhance their knowledge base. Achievements: Overall, 77 Fellows have been enrolled since 2002. Of the 57 Fellows who were admitted between 2002 and 2008, 94.7% (54 completed the Fellowship successfully and 50 (92.3% are employed in senior leadership and management positions in Uganda and internationally. Eighty-eight percent of those employed (44/54 work in institutions registered in Uganda, indicating a high level of in-country retention. Nineteen of the 20 Fellows who were admitted between 2009 and 2010 are still undergoing training. A total of 67 institutions have hosted Fellows since 2002. The host institutions have benefited through staff training and technical expertise from the Fellows as well as through grant support to Fellows to develop and implement innovative pilot projects. The success of the program hinges on support from mentors, stakeholder involvement, and the hands-on approach employed in training. Conclusion: The Fellowship Program offers a unique opportunity for hands

  18. Progress and problems in the Formerly Utilized Sites Remedial Action Program and Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Fiore, J.J.; Turi, G.P.

    1988-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to identify, evaluate, and as appropriate, conduct remedial actions at sites used in the early years of nuclear energy development by the Manhattan Engineer District and the Atomic Energy Commission (AEC). This program currently has 29 sites and is evaluating 350 other sites for possible inclusion in the program. Another remedial action program in the Department of Energy's (DOE) Division of Facility and Site Decommissioning Projects is the Surplus Facilities Management Program (SFMP). The SFMP involves the safe management, decontamination and disposal of surplus DOE contaminated facilities which were not related to defense activities. There are currently 33 projects at 15 different sites in the program. These two programs have made steady progress over the last 10 or so years in cleaning up sites so that they can be reused or released for unrestricted use. Work has been completed at 8 of the FUSRAP sites and three of the SFMP sites

  19. Enhanced cognitive Radio Resource Management for LTE systems

    KAUST Repository

    Alqerm, Ismail

    2013-10-01

    The explosive growth in mobile Internet and related services has increased the need for more bandwidth in cellular networks. The Long-Term Evolution (LTE) technology is an attractive solution for operators and subscribers to meet such need since it provides high data rates and scalable bandwidth. Radio Resource Management (RRM) is essential for LTE to provide better communication quality and meet the application QoS requirements. Cognitive resource management is a promising solution for LTE RRM as it improves network efficiency by exploiting radio environment information, intelligent optimization algorithms to configure transmission parameters, and mitigate interference. In this paper, we propose a cognitive resource management scheme to adapt LTE network parameters to the environment conditions. The scheme optimizes resource blocks assignment, modulation selection and bandwidth selection to maximize throughput and minimize interference. The scheme uses constrained optimization for throughput maximization and interference control. It is also enhanced by learning mechanism to reduce the optimization complexity and improve the decision-making quality. Our evaluation results show that our scheme achieved significant improvements in throughput and LTE system capacity. Results also show the improvement in the user satisfaction over other techniques in LTE RRM.

  20. Commentary on the Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Sheng, G.; Shemilt, L.W.

    1981-01-01

    A summary of the first formal review of the Technical Advisory Committee (TAC) to Atomic Energy of Canada Limited on the Nuclear Fuel Waste Management Program is presented. The Program is described briefly and the composition and role of TAC in relation to the Program is outlined. Salient points and major recommendations are presented from the First Annual Report of TAC in which geoscience aspects of the Program were emphasized. It is the view of the Committee that overall, the whole Waste Management Program is well conceived, that there are many impressive accomplishments of high quality, that detailed research objectives are becoming more clearly delineated, that there is growing clarification as to the most critical areas in which research needs to be accomplished and that the increasing participation by university and industry scientists and engineers is reassuring

  1. [The German program for disease management guidelines. Results and perspectives].

    Science.gov (United States)

    Ollenschläger, Günter; Kopp, Ina

    2007-05-15

    The Program for National Disease Management Guidelines (German DM-CPG Program) is a joint initiative of the German Medical Association (umbrella organization of the German Chambers of Physicians), the Association of the Scientific Medical Societies (AWMF), and of the National Association of Statutory Health Insurance Physicians (NASHIP). The program aims at developing, implementing and continuously updating best-practice recommendations for countrywide and regional disease management programs in Germany. Since 2003 twelve national guidelines (topics: asthma, chronic obstructive pulmonary disease, HI (Chronic heart failure), CVD (Chronic coronary heart disease) back pain, depression, several aspects of diabetes) have been produced by use of a standardized procedure in accordance with internationally consented methodologies. For countrywide dissemination and implementation the program uses a wide range of specialist journals, continuous medical education and quality management programs. So far, 36 out of 150 national scientific medical associations, four allied health profession organizations, and twelve national consumer organizations have been participating in the DM-CPG Program. Studies to evaluate the program's effects on health-care providers' behavior and patients' outcomes are under way.

  2. Management program on radioactive wastes in research

    International Nuclear Information System (INIS)

    Xavier, Ana Maria; Wieland, Patricia; Heilbron Filho, Paulo Fernando L.; Ferreira, Rubemar de Souza

    1998-01-01

    This document has the objective to orient and advise the researchers to practice a safety management of radioactive wastes in each research laboratory, based upon the technical norms of the Brazilian Nuclear Energy Commission and the recommendations of the International Atomic Energy Agency. Additionally, basic information on the main radioisotopes used in research are presented, including the processes used for production of radioisotopes, methods for radiation detection, range of alpha and beta particles, background radiation, as well as principles on radioprotection and biological effects of radiation

  3. Risk Management Program Application for the Component Test Capability

    International Nuclear Information System (INIS)

    Stephanie L. Austad; Jeffrey D. Bryan

    2009-01-01

    This paper documents the application of the risk management program requirements to Component Test Capability (CTC) Project activities for each CTC alternative. In particular, DOE O 413.3A, 'Program and Project Management for the Acquisition of Capital Assets,' and DOE G 413.3-7, 'Risk Management Guide for Project Management,' will apply in the event that Alternative 4, Single, Standalone Component Test Facility (CTF), is selected and approved. As such, it is advisable to begin planning to meet the associated Department of Energy (DOE) requirements and guidance as early in the acquisition process as practicable. This white paper is intended to assist in this planning and to support associated decision-making activities. Nontechnical risks associated with each alternative will be identified to support the Next Generation Nuclear Plant (NGNP) CTC alternatives analysis. Technical risks are assumed to be addressed through the Technology Development Risk Management modeling process and are inherent to the alternatives

  4. Quality programs for waste management research and development

    International Nuclear Information System (INIS)

    Hood, F.C.

    1990-06-01

    The Pacific Northwest Laboratory (PNL) is a US Department of Energy (DOE) multi-program national laboratory. PNL develops waste management processes and techniques as well as providing management services for characterization and remediation of radioactive and/or hazardous waste sites for the DOE. This paper deals with the application of total quality management principles to waste management research and development activities at PNL. The PNL Quality Program has evolved with expanding expectations for ''error-free'' performance from the client and the public sector; it describes the management controls needed to achieve desired levels of product quality and to verify they are reached. It includes the definition of work requirements, performance objectives, roles and responsibilities, performance indicators and measurement, performance feedback mechanisms, and process improvement methodologies. 6 refs

  5. Do Loyalty Programs Really Enhance Behavioral Loyalty? An Empirical Analysis Accounting for Self-Selecting Members

    NARCIS (Netherlands)

    J. Leenheer (Jorna); H.J. van Heerde (Harald); T.H.A. Bijmolt (Tammo); A. Smidts (Ale)

    2006-01-01

    textabstractOne of the pressing issues in marketing is whether loyalty programs really enhance behavioral loyalty. Loyalty program members may have a much higher share-of-wallet at the firm with the loyalty program than non-members have, but this does not necessarily imply that loyalty programs are

  6. Urban Extension's New Nontraditional Offering: Parent-Child Reading Enhancement Program

    Science.gov (United States)

    Brandon, Dorothy P.; Tsamaase, Marea; Humphrey, Ronnie; Crenshaw, Kevin

    2018-01-01

    Urbanization is causing a major shift in Extension's programming throughout the United States. We present results of a nontraditional urban program (the Parent-Child Reading Enhancement Program) that is being implemented by Alabama Cooperative Extension System's Urban Affairs and New Nontraditional Programs unit. Findings suggest that this…

  7. Do loyalty programs really enhance behavioral loyalty? An empirical analysis accounting for self-selecting members

    NARCIS (Netherlands)

    Leenheer, Jorna; van Heerde, Harald J.; Bijmolt, Tammo H. A.; Smidts, Ale

    One of the pressing issues in marketing is whether loyalty programs really enhance behavioral loyalty. Loyalty program members may have a much higher share-of-wallet at the firm with the loyalty program than non-members have, but this does not necessarily imply that loyalty programs are effective.

  8. BNFL nuclear decommissioning liabilities management program

    International Nuclear Information System (INIS)

    Colquhoun, A.P.

    1995-01-01

    The objective of this paper is to describe BNFL's policy and strategy for decommissioning and also to summarize the overall scope of nuclear liabilities in the wider field of waste retrieval and storage, as well as the dismantling and demolition aspects of decommissioning. BNFL's recently established organisational arrangements for discharging all types of these liabilities are explained, together with a review of practical progress in dealing with them. Organisational changes in recent years have amalgamated decommissioning work with operations covering waste storage and retrieval operations. A strategy of minimising residual activity in shutdown plants is pursued, followed by dismantling and demolition on appropriate time scales to minimise risk and cost. Since April 1995, a new BNFL subsidiary, Nuclear Liabilities Management Company Limited has taken responsibility for discharge of BNFL's Waste Retrieval and Decommissioning liabilities on all BNFL sites. NLM has the objectives of optimal and lowest cost management of liabilities and much clearer segregation of physical operations from project specification and planning. The Ministry of Defense (MoD) policy, strategy, work programmes and progress for the Atomic Weapons Establishment (AWE) are also outlined. MoD/AEA has established an equivalent strategy for dealing with its liabilities. (J.S.). 5 refs., 2 figs., 4 appends

  9. Workplace disability management programs promoting return-to-work

    DEFF Research Database (Denmark)

    Gensby, Ulrik; Lund, Thomas; Kowalski, Krystyna

    This report presents a Campbell systematic review on the effectiveness of workplace disability management programs (WPDM programs) promoting return to work (RTW), as implemented and practised by employers. The objectives of this review were to assess the effects of WPDM programs, to examine...... non-randomized studies (NRS) and eleven single group ‘before and after’ studies (B & A)), including data from eleven different WPDM programs, met the inclusion criteria. There were insufficient data on the characteristics of the sample and the effect sizes were uncertain. There is a lack of evidence...

  10. Program Management Approach to the Territorial Development of Small Business

    Directory of Open Access Journals (Sweden)

    Natalia Aleksandrovna Knysh

    2016-06-01

    Full Text Available This article presents the results of the research of the application on a state level of the program management approach to the territorial development of small business. Studying the main mechanism of the state policy implementation in the sphere of small business on a regional level, the authors have revealed the necessity to take into account the territorial specificity while the government programs of small business development are being formed. The analysis of the national practice of utilizing the program management mechanism in the regional system of the government support of small entrepreneurship was conducted on the example of Omsk region. The results of the analysis have shown the inefficiency of the current support system for small business and have determined the need to create an integrated model of territorial programming, which would not only contribute to the qualitative development of small business, but also provide the functioning efficiency of program management mechanism. As a result, the authors have created the two-level model of the programming of the territorial development of small business, which allows to satisfy purposefully the needs of entrepreneurship taking into account the specificity of the internal and external environment of the region. The first level of the model is methodological one and it is based on the marketing approach (the concepts of place marketing and relationship marketing to the operation of the program management mechanism. The second level of the model is methodical one. It offers the combination of the flexible methods of management of programming procedure (benchmarking, foresight, crowdsourcing and outsourcing. The given model raises the efficiency of the management decisions of the state structures in the sphere of small business. Therefore, it is interesting for the government authorities, which are responsible for the regional and municipal support programs of small business, as well

  11. Savannah River Site Waste Management Program Plan, FY 1993

    International Nuclear Information System (INIS)

    1993-06-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes

  12. La Hague Continuous Improvement Program: Enhancement of the Vitrification Throughput

    International Nuclear Information System (INIS)

    Petitjean, V.; De Vera, R.; Hollebecque, J.F.; Tronche, E.; Flament, T.; Pereira Mendes, F.; Prod'homme, A.

    2006-01-01

    calciner was increased from 76 l/hr to 90 l/hr in three steps. Results of each step were followed by a team of experts from CEA, AREVA/COGEMA and AREVA/SGN analyzing the impact on the vitrification facility. The results obtained at the end of this testing campaign were a success: the target feeding flow-rate was reached, improving the line productivity without consequences in equipment availability and off gas treatment performances. This paper presents the results obtained for each step of this technological improvement and illustrates the La Hague continuous improvement program performed in order to enhance the vitrification throughput. (authors)

  13. Neuro-Linguistic Programming for Leaders and Managers

    OpenAIRE

    Tosey, Paul

    2010-01-01

    On few occasions in the history of modern management have leadership skills been in such sharp focus as they are now. The ability to direct often very large and diverse organizations; to make sense of the complex and turbulent markets and environments in which you operate; and to adapt and learn seems at an all time premium. The premise behind the fifth edition of this influential Handbook is that leadership, management and organizational development are all parts of the same process; enhanci...

  14. Constructing a resilience index for the Enhanced Critical Infrastructure Protection Program

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, R. E.; Bassett, G. W.; Buehring, W. A.; Collins, M. J.; Dickinson, D. C.; Eaton, L. K.; Haffenden, R. A.; Hussar, N. E.; Klett, M. S.; Lawlor, M. A.; Millier, D. J.; Petit, F. D.; Peyton, S. M.; Wallace, K. E.; Whitfield, R. G.; Peerenboom, J P

    2010-10-14

    Following recommendations made in Homeland Security Presidential Directive 7, which established a national policy for the identification and increased protection of critical infrastructure and key resources (CIKR) by Federal departments and agencies, the U.S. Department of Homeland Security (DHS) in 2006 developed the Enhanced Critical Infrastructure Protection (ECIP) program. The ECIP program aimed to provide a closer partnership with state, regional, territorial, local, and tribal authorities in fulfilling the national objective to improve CIKR protection. The program was specifically designed to identify protective measures currently in place in CIKR and to inform facility owners/operators of the benefits of new protective measures. The ECIP program also sought to enhance existing relationships between DHS and owners/operators of CIKR and to build relationships where none existed (DHS 2008; DHS 2009). In 2009, DHS and its protective security advisors (PSAs) began assessing CIKR assets using the ECIP program and ultimately produced individual protective measure and vulnerability values through the protective measure and vulnerability indices (PMI/VI). The PMI/VI assess the protective measures posture of individual facilities at their 'weakest link,' allowing for a detailed analysis of the most vulnerable aspects of the facilities (Schneier 2003), while maintaining the ability to produce an overall protective measures picture. The PMI has six main components (physical security, security management, security force, information sharing, protective measures assessments, and dependencies) and focuses on actions taken by a facility to prevent or deter the occurrence of an incident (Argonne National Laboratory 2009). As CIKR continue to be assessed using the PMI/VI and owners/operators better understand how they can prevent or deter incidents, academic research, practitioner emphasis, and public policy formation have increasingly focused on resilience as a

  15. ERDA's long-term waste management goals and programs

    International Nuclear Information System (INIS)

    Perge, A.F.; Trice, V.G. Jr.; Walton, R.D. Jr.

    1976-01-01

    This paper presents an overview of the ERDA's major program for the long-term waste management of radioactive waste and provides a perspective for symposium participants with regard to the interrelationship of specific components of the program that are discussed in detail in other ERDA-sponsored papers. Needs, goals, and plans are reviewed for ERDA's management of the commercially generated wastes which are expected to be delivered to ERDA in accordance with Federal regulations. At present, ERDA responsibilities include long-term management of commercial-level wastes. Possible future regulations may give ERDA responsibility for the long-term management of commercial low-level solid wastes contaminated with transuranic nuclides. Primary planning goals and programs for the development of terminal storage facilities and waste processing technology to produce acceptable waste forms for long-term management are reviewed for each of the waste types identified above. The status of development programs for the long-term management of airborne radionuclides, which may be required at some time in the future, is also reviewed. (author)

  16. Enhancing outpatient clinics management software by reducing patients’ waiting time

    Directory of Open Access Journals (Sweden)

    Iman Almomani

    2016-11-01

    Full Text Available Summary: The Kingdom of Saudi Arabia (KSA gives great attention to improving the quality of services provided by health care sectors including outpatient clinics. One of the main drawbacks in outpatient clinics is long waiting time for patients—which affects the level of patient satisfaction and the quality of services. This article addresses this problem by studying the Outpatient Management Software (OMS and proposing solutions to reduce waiting times. Many hospitals around the world apply solutions to overcome the problem of long waiting times in outpatient clinics such as hospitals in the USA, China, Sri Lanka, and Taiwan. These clinics have succeeded in reducing wait times by 15%, 78%, 60% and 50%, respectively. Such solutions depend mainly on adding more human resources or changing some business or management policies. The solutions presented in this article reduce waiting times by enhancing the software used to manage outpatient clinics services. Both quantitative and qualitative methods have been used to understand current OMS and examine level of patient’s satisfaction. Five main problems that may cause high or unmeasured waiting time have been identified: appointment type, ticket numbering, doctor late arrival, early arriving patient and patients’ distribution list. These problems have been mapped to the corresponding OMS components. Solutions to the above problems have been introduced and evaluated analytically or by simulation experiments. Evaluation of the results shows a reduction in patient waiting time. When late doctor arrival issues are solved, this can reduce the clinic service time by up to 20%. However, solutions for early arriving patients reduces 53.3% of vital time, 20% of the clinic time and overall 30.3% of the total waiting time. Finally, well patient-distribution lists make improvements by 54.2%. Improvements introduced to the patients’ waiting time will consequently affect patients’ satisfaction and improve

  17. Management characteristics of successful public health programs: "Avahan" HIV prevention program in India.

    Science.gov (United States)

    Mabuchi, Shunsuke; Singh, Suneeta; Bishnu, Rituparna; Bennett, Sara

    2013-01-01

    This paper analyzes Avahan, an HIV prevention program in India, that achieved very rapid scale-up. The paper aims to (i) define the distinctive features of the management of Avahan, (ii) examine how the distinctive features relate to key constructs in management frameworks and (iii) investigate how the management approaches of Avahan contributed to the program's ability to scale-up rapidly while maintaining service quality. The Delphi method was used to identify the distinctive features of Avahan. Through three rounds of questions, 38 participants closely associated with Avahan were asked to identify and develop consensus on its distinctive features. These features were then mapped against the Baldrige Health Care Criteria for Performance Excellence to investigate how they related to important dimensions of management. A total of 17 distinctive features of Avahan were identified. These distinctive features emphasized the importance of data use and performance monitoring at all levels, especially combined with a flexible management style that facilitated local responsiveness to community, innovation and learning. The distinctive features comprehensively addressed the criteria for management excellence in the Baldridge framework. In the case of Avahan, the rigorous application of known management techniques to public health programs appears to have been an important factor in the successful scale-up of the program. Also, the Baldrige criteria seem applicable to health programs in low-income and middle-income countries; further applications would help test their robustness and utility in such contexts. Copyright © 2012 John Wiley & Sons, Ltd.

  18. NEPO cable system aging management programs

    International Nuclear Information System (INIS)

    Toman, G.

    2002-01-01

    Full text: Cable polymer aging and condition monitoring is being studied in detail under the Nuclear Energy Plant Optimization Program (NEPO) that is co-sponsored by the U.S. Department of Energy and EPRI. Significant advances in modeling of polymer aging and condition monitoring have occurred and continue to be developed. The activities include: Analysis of the linearity of the Arrhenius model to room temperature; Development of a wear-out technique for determining remaining life of cable polymers; Determination of the aging fragility point for composite EPR/CSPE insulation with respect to LOCA function; Development of visual/tactile training aids for cable assessment; Development of a totally new nuclear magnetic resonance condition monitoring technique; Assessment of existing techniques with regard to repeatability, accuracy and ease of use. Through use of highly precise oxygen consumption experiments, the linearity of the Arrhenius model is being evaluated. In these experiments, polymer is placed in vials with a known amount of oxygen and aged at much lower temperatures than is possible with standard accelerated aging techniques. aging results are possible at room temperature. The technique is being applied to commonly used insulation and jacket polymers. The wear-out technique allows highly non-linear aging behavior to be made linear. The wearout point of a polymer is determined through high-rate aging and use of a condition monitoring technique to establish the end point. Then, micro-samples of cable that have been naturally aged are subjected to high rate aging to the same end point. The ratio of the remaining high rate aging period to the total high rate aging time provides a linear indication of the remaining service time. Initial screening of nuclear plant cable systems can use visual/tactile techniques to identify cable that has aged significantly. Training aids have been developed by developing sets of specimens with accelerated aging ranging from none

  19. Radwastes management program of the IEN

    International Nuclear Information System (INIS)

    Peres, S.S.; Godoy, J.M.O

    2000-01-01

    Low level radioactive wastes are produced during the operation of the radioactive and nuclear installations of the Nuclear Engineering Institute (Instituto de Engenharia Nuclear, IEN) situated in Rio de Janeiro City, Brazil. These wastes can be generated during the operation and maintenance of the CV-28 Cyclotron, the radioisotopes production, the research activities using natural thorium and uranium in chemical laboratories and, eventually, during the operation Argonauta Reactor. In accordance to the methodology of the radwastes management adopted in the IEN, the wastes are segregated and treated depending on theirs physical, chemical, biological and radiological properties. The wastes with important levels of activity are separate and collected in special containers. Wastes containing short-lived radionuclides are also separated and left away for decaying. Solid wastes are constituted of materials used in laboratories, such as papers, rubber gloves, plastics, over shoes, broken glassware, metal pieces, etc. These wastes are classified as compressible, combustible, non-compressible and non- combustible. The solid wastes are collected in suitable containers placed throughout the working area. Basically, the treatment methods used for these wastes are activity decay, decontamination and compaction. Liquid wastes are generated in small volumes and, generally, containing little quantities of radionuclides. These wastes are classified as aqueous and non-aqueous, acid, alkaline. The diluted aqueous wastes produced in hot laboratories are collected in liquid effluent collection stations for analysis by gamma spectrometry. If the activity concentration is smaller than the established limits in waste management national standards, they are discharge inside of the local sanitary sewer system. Otherwise, these wastes are retained for treatment. The treatment methods used for liquid wastes are activity decay, chemical precipitation, ion exchange and immobilization in inert

  20. [Extraction of management information from the national quality assurance program].

    Science.gov (United States)

    Stausberg, Jürgen; Bartels, Claus; Bobrowski, Christoph

    2007-07-15

    Starting with clinically motivated projects, the national quality assurance program has established a legislative obligatory framework. Annual feedback of results is an important means of quality control. The annual reports cover quality-related information with high granularity. A synopsis for corporate management is missing, however. Therefore, the results of the University Clinics in Greifswald, Germany, have been analyzed and aggregated to support hospital management. Strengths were identified by the ranking of results within the state for each quality indicator, weaknesses by the comparison with national reference values. The assessment was aggregated per clinical discipline and per category (indication, process, and outcome). A composition of quality indicators was claimed multiple times. A coherent concept is still missing. The method presented establishes a plausible summary of strengths and weaknesses of a hospital from the point of view of the national quality assurance program. Nevertheless, further adaptation of the program is needed to better assist corporate management.

  1. 77 FR 40072 - Assessment of the Program for Enhanced Review Transparency and Communication for New Molecular...

    Science.gov (United States)

    2012-07-06

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-N-0603] Assessment of the Program for Enhanced Review Transparency and Communication for New Molecular Entity New... statement of work for an assessment of the Program for Enhanced Review Transparency and Communication for...

  2. Enhancing Agency through Leadership Development Programs for Faculty

    Science.gov (United States)

    Templeton, Lindsey; O'Meara, KerryAnn

    2018-01-01

    The ADVANCE Leadership Fellows Program at the University of Maryland is a yearlong professional development program for faculty aspiring to or recently engaged in leadership roles. Data shows an increase in participants' sense of agency to become academic leaders following the program. We use a comprehensive data set, including program…

  3. Integrated Risk and Knowledge Management Program -- IRKM-P

    Science.gov (United States)

    Lengyel, David M.

    2009-01-01

    The NASA Exploration Systems Mission Directorate (ESMD) IRKM-P tightly couples risk management and knowledge management processes and tools to produce an effective "modern" work environment. IRKM-P objectives include: (1) to learn lessons from past and current programs (Apollo, Space Shuttle, and the International Space Station); (2) to generate and share new engineering design, operations, and management best practices through preexisting Continuous Risk Management (CRM) procedures and knowledge-management practices; and (3) to infuse those lessons and best practices into current activities. The conceptual framework of the IRKM-P is based on the assumption that risks highlight potential knowledge gaps that might be mitigated through one or more knowledge management practices or artifacts. These same risks also serve as cues for collection of knowledge particularly, knowledge of technical or programmatic challenges that might recur.

  4. Program management: The keys to a successful ERWM contract

    International Nuclear Information System (INIS)

    Lenyk, R.G.; Cusack, J.G.

    1995-01-01

    Program management for a large Environmental Restoration and Waste Management (ERWM) task order contract is both a skill and an art. Unlike project management, program management deals with global and political issues, with both client and home organizations, as well as with day-to-day operations. Program management requires up-front planning and nurturing, for no contract matures successfully by itself. This paper identifies the many opportunities presented in the planning and initial implementation of the contract. Potential traps are identified so that they can be recognized and avoided or mitigated. Teaming and subcontracting are also addressed. The authors rely on years of program management experience to explore such questions as the following: Can you have an integrated team? What needs to be done before you sign Your contract? Do you know who your client(s) is(are)? Have you incorporated the relevant, especially any new, procurement strategies? The US Department of Energy-Oak Ridge Operations (DOE-ORO) ERWM Remedial Design Contract with Foster Wheeler Environmental Corporation is used as a model for exploring these topics. This ERWM Program-which focuses on the Oak Ridge National Laboratory, the Y-12 Weapons Plant, and the K-25 Site in Oak Ridge, Tennessee; the Paducah Gaseous Diffusion Plant in Paducah, Kentucky; and the Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio-is in its fifth year with over 225 task orders. The program has been highly successful and has obtained from DOE outstanding marks for achieving quality, responsiveness, timeliness, and subcontracting goals

  5. 75 FR 16623 - Emergency Management for Higher Education Grant Program

    Science.gov (United States)

    2010-04-01

    ... range of campus problems including sexual assault, arson, robbery, harassment, simple assault, binge... framework of the four phases of emergency management (Prevention-Mitigation, Preparedness, Response, and..., enhance, implement, and evaluate campus-based and/or community-based prevention strategies to reduce high...

  6. Development of a chronic care ostomy self-management program.

    Science.gov (United States)

    Grant, Marcia; McCorkle, Ruth; Hornbrook, Mark C; Wendel, Christopher S; Krouse, Robert

    2013-03-01

    Each year a percentage of the 1.2 million men and women in the United States with a new diagnosis of colorectal cancer join the 700,000 people who have an ostomy. Education targeting the long-term, chronic care of this population is lacking. This report describes the development of a Chronic Care Ostomy Self-Management Program, which was informed by (1) evidence on published quality-of-life changes for cancer patients with ostomies, (2) educational suggestions from patients with ostomies, and (3) examination of the usual care of new ostomates to illustrate areas for continued educational emphases and areas for needed education and support. Using these materials, the Chronic Care Ostomy Self-Management Program was developed by a team of multi-disciplinary researchers accompanied by experienced ostomy nurses. Testing of the program is in process. Pilot study participants reported high satisfaction with the program syllabus, ostomy nurse leaders, and ostomate peer buddies.

  7. Development of a Chronic Care Ostomy Self Management Program

    Science.gov (United States)

    Grant, Marcia; McCorkle, Ruth; Hornbrook, Mark C.; Wendel, Christopher S.; Krouse, Robert

    2012-01-01

    Each year a percentage of the 1.2 million men and women in the United States with a new diagnosis of colorectal cancer join the 700,000 people who have an ostomy. Education targeting the long term, chronic care of this population is lacking. This report describes the development of a Chronic Care Ostomy Self Management Program, which was informed by (1) evidence on published quality of life changes for cancer patients with ostomies, (2) educational suggestions from patients with ostomies, and (3) examination of the usual care of new ostomates to illustrate areas for continued educational emphases and areas for needed education and support. Using these materials, the Chronic Care Ostomy Self Management Program was developed by a team of multi-disciplinary researchers accompanied by experienced ostomy nurses. Testing of the program is in process. Pilot study participants reported high satisfaction with the program syllabus, ostomy nurse leaders, and ostomate peer buddies. PMID:23104143

  8. Sustainability Management Program for Industries- A Case Study

    Directory of Open Access Journals (Sweden)

    Long Su Weng Alwin

    2017-01-01

    Full Text Available This research studied the effectiveness of Sustainability Management Program in improving production efficiency of the manufacturing site with verified result using the regression analysis. For this study, a dairy manufacturing industry located in Malaysia was selected and major energy consuming equipment in the industryplant were identified. Sustainability Management Program (SMP was carried out for three years and energy consumption and product has improved regression coefficients of 0.625 in 2013, 0.826 in 2014, and 0.878 in 2015 as the manufacturing site becomes more energy efficient. This suggests that the energy management should be carried out in a continuous manner with energy management team responsible for energy saving practices.

  9. Opportunities for adaptive online collaboration to enhance rural land management.

    Science.gov (United States)

    Baumber, Alex; Metternicht, Graciela; Ampt, Peter; Cross, Rebecca; Berry, Emily

    2018-08-01

    Cross-property cooperation has the potential to enhance the effectiveness of environmental management actions that cut across property boundaries. Online tools can facilitate this and overcome barriers to landholder engagement in collaborative management. However, collaborative online tools need to be designed and tailored to users' needs and values, and landholder participation in the development process is critical to ensuring uptake and long-term use. This article presents a case study from the Central Tablelands region of New South Wales, Australia, where landholders have been involved in participatory development of a new online collaboration tool. The case study results highlight the significance of issues such as internet access, privacy, technical proficiency and differing stakeholder objectives. A landholder survey identified mapping and the uploading of monitoring data as important functions for the online tool, but these were not rated as highly as functions relating to data security, sharing settings and key term searches. Consequently, we recommend that a future online collaboration tool for the region is not framed specifically as a mapping or citizen science tool, but rather as an adaptive collaboration and communication tool that can incorporate a variety of data types and formats and be modified over time in line with changing landholder needs. Copyright © 2018 Elsevier Ltd. All rights reserved.

  10. Effect of the Programmed Nutrition Beef Program on moisture retention of cooked ground beef patties and enhanced strip loins.

    Science.gov (United States)

    2015-02-01

    This study evaluated the influence of the Programmed Nutrition Beef Program and exogenous growth promotants (ExGP) on water holding capacity characteristics of enhanced beef strip loins. Sixty, frozen strip loins, arranged in a 2 × 2 factorial treatment arrangement with dietary program serving as the first factor and use of ExGP as the second factor, were thawed, injected with an enhancement solution, and stored for 7 days. Loins from ExGP cattle possessed the ability to bind more (P water before pumping and bind less (P water after pumping and storage. Loin pH across treatments was similar (P > 0.10) before injection, but increased post-injection and after storage (P 0.10). The Programmed Nutrition Beef Program and use of ExGPs minimally impacted water holding capacity of enhanced frozen/thawed beef strip loins.

  11. Workplace disability management programs promoting return-to-work

    DEFF Research Database (Denmark)

    Gensby, Ulrik; Lund, Thomas; Kowalski, Krystyna

    Return-to-work (RTW) following work related injuries or illnesses is receiving continued attention from a wide spectrum of research fields and is an important topic for many policy- and decision-makers. In particular long-term sickness absence is a challenge associated with a series of negative...... is still needed. This review will evaluate the effect of workplace disability management programs promoting RTW - i.e. report on the evidence and describes and combine results from individual studies on workplace disability management programs and explain possible variations in practice....

  12. Small Water System Management Program: 100 K Area

    International Nuclear Information System (INIS)

    Hunacek, G.S. Jr.

    1995-01-01

    Purposes of this document are: to provide an overview of the service and potable water system presently in service at the Hanford Site's 100 K Area; to provide future system forecasts based on anticipated DOE activities and programs; to delineate performance, design, and operations criteria; and to describe planned improvements. The objective of the small water system management program is to assure the water system is properly and reliably managed and operated, and continues to exist as a functional and viable entity in accordance with WAC 246-290-410

  13. Underlying chemistry research for the nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Torgerson, D.F.; Sagert, N.H.; Shoesmith, D.W.; Taylor, P.

    1984-04-01

    This document reviews the underlying chemistry research part of the Canadian Nuclear Fuel Waste Management Program, carried out in the Research Chemistry Branch. This research is concerned with developing the basic chemical knowledge and under-standing required in other parts of the Program. There are four areas of underlying research: Waste Form Chemistry, Solute and Solution Chemistry, Rock-Water-Waste Interactions, and Abatement and Monitoring of Gas-Phase Radionuclides

  14. File Managing and Program Execution in Web Operating Systems

    OpenAIRE

    Bravetti, Mario

    2010-01-01

    Web Operating Systems can be seen as an extension of traditional Operating Systems where the addresses used to manage files and execute programs (via the basic load/execution mechanism) are extended from local filesystem path-names to URLs. A first consequence is that, similarly as in traditional web technologies, executing a program at a given URL, can be done in two modalities: either the execution is performed client-side at the invoking machine (and relative URL addressing in the executed...

  15. An Improved Dynamic Programming Decomposition Approach for Network Revenue Management

    OpenAIRE

    Dan Zhang

    2011-01-01

    We consider a nonlinear nonseparable functional approximation to the value function of a dynamic programming formulation for the network revenue management (RM) problem with customer choice. We propose a simultaneous dynamic programming approach to solve the resulting problem, which is a nonlinear optimization problem with nonlinear constraints. We show that our approximation leads to a tighter upper bound on optimal expected revenue than some known bounds in the literature. Our approach can ...

  16. 78 FR 49663 - Enhanced Risk Management Standards for Systemically Important Derivatives Clearing Organizations

    Science.gov (United States)

    2013-08-15

    ... COMMODITY FUTURES TRADING COMMISSION 17 CFR Part 39 RIN 3038-AC98 Enhanced Risk Management...'') is adopting final regulations to implement enhanced risk management standards for systemically..., strengthen the risk management practices of DCOs, and increase overall confidence in the financial system by...

  17. A Study of Program Manager Effectiveness and Risk Taking Propensity

    Science.gov (United States)

    1988-09-01

    Kelly Sherwin, my section leader , has been a great source of leadership and inspiration . Next, I would like to thank Lieutenant Colonel Fred Westfall...managers peiZ.rm ten basic tasks which can be broken into three categories. The categories and tasks are: Interpersonal Roles 1. Figurehead 2. Leader 3...17:59). When-a program manager is successful, he is not necessarily effective (10:10). Luthans studied this phenomenon by examining the managerial

  18. Ciclon: A neutronic fuel management program for PWR's consecutive cycles

    International Nuclear Information System (INIS)

    Aragones, J.M.

    1977-01-01

    The program description and user's manual of a new computer code is given. Ciclon performs the neutronic calculation of consecutive reload cycles for PWR's fuel management optimization. Fuel characteristics and burnup data, region or batch sizes, loading schemes and state of previously irradiated fuel are input to the code. Cycle lengths or feed enrichments and burnup sharing for each region or batch are calculate using different core neutronic models and printed or punched in standard fuel management format. (author) [es

  19. Enhancing voluntary participation in community collaborative forest management: a case of Central Java, Indonesia.

    Science.gov (United States)

    Lestari, Sri; Kotani, Koji; Kakinaka, Makoto

    2015-03-01

    This paper examines voluntary participation in community forest management, and characterizes how more participation may be induced. We implemented a survey of 571 respondents and conducted a case study in Central Java, Indonesia. The study's novelty lies in categorizing the degrees of participation into three levels and in identifying how socio-economic factors affect people's participation at each level. The analysis finds that voluntary participation responds to key determinants, such as education and income, in a different direction, depending on each of the three levels. However, the publicly organized programs, such as information provision of benefit sharing, are effective, irrespective of the levels of participation. Overall, the results suggest a possibility of further success and corrective measures to enhance the participation in community forest management. Copyright © 2014 Elsevier Ltd. All rights reserved.

  20. Enhanced thermaly managed packaging for III-nitride light emitters

    Science.gov (United States)

    Kudsieh, Nicolas

    In this Dissertation our work on `enhanced thermally managed packaging of high power semiconductor light sources for solid state lighting (SSL)' is presented. The motivation of this research and development is to design thermally high stable cost-efficient packaging of single and multi-chip arrays of III-nitrides wide bandgap semiconductor light sources through mathematical modeling and simulations. Major issues linked with this technology are device overheating which causes serious degradation in their illumination intensity and decrease in the lifetime. In the introduction the basics of III-nitrides WBG semiconductor light emitters are presented along with necessary thermal management of high power cingulated and multi-chip LEDs and laser diodes. This work starts at chip level followed by its extension to fully packaged lighting modules and devices. Different III-nitride structures of multi-quantum well InGaN/GaN and AlGaN/GaN based LEDs and LDs were analyzed using advanced modeling and simulation for different packaging designs and high thermal conductivity materials. Study started with basic surface mounted devices using conventional packaging strategies and was concluded with the latest thermal management of chip-on-plate (COP) method. Newly discovered high thermal conductivity materials have also been incorporated for this work. Our study also presents the new approach of 2D heat spreaders using such materials for SSL and micro LED array packaging. Most of the work has been presented in international conferences proceedings and peer review journals. Some of the latest work has also been submitted to well reputed international journals which are currently been reviewed for publication. .

  1. Technical Performance Measurement, Earned Value, and Risk Management: An Integrated Diagnostic Tool for Program Management

    National Research Council Canada - National Science Library

    Pisano, N

    2002-01-01

    ...) and in private industry. Currently-reported earned value data contains invaluable planning and budget information with proven techniques for program management, however, shortcomings of the system are its emphasis...

  2. Quality planning and executive force of program files in quality management

    International Nuclear Information System (INIS)

    Sun Danyu

    2008-01-01

    This paper discussed the quality planning in quality management. In the quality planning, the quality objectives, the quality liabilities and the procedures shall be developed, grading supervise shall be exercised, quality assurance program shall be established, and requirements on resource and documents shall be defined. At the same time, we shall also intensify and enhance the execute force of program documentation, supervise and inspect the implementation result, establish detailed check indicators, and bring up the requirement on how to improve the quality of products. (author)

  3. Genetic diversity of tambaqui broodstocks in stock enhancement programs

    Directory of Open Access Journals (Sweden)

    Americo Moraes Neto

    2017-06-01

    Full Text Available Natural populations of tambaqui (Colossoma macropomum have significantly decreased in recent decades especially due to human extraction activities. So that the environmental impact may be reduced, the restocking of fish and increase in fish production are enhanced. Genetic evaluations using molecular markers are essential for this purpose. Current study evaluates the genetic variability of two tambaqui broodstocks used in restocking programs. Sixty-five samples (33 samples from broodstock A and 32 samples from broodstock B were collected. DNA was extracted from caudal fin samples, with the amplification of four microsatellite loci: Cm1A11 (EU685307 Cm1C8 (EU685308 Cm1F4 (EU685311 and Cm1H8 (EU685315. Fourteen alleles in the stock of broodstock A were produced, five alleles for Cm1A11 locus (230, 255, 260, 270 and 276 bp, three alleles Cm1C8 (239, 260, and 273 bp, two alleles Cm1F4 (211 and 245 bp, four alleles for Cm1H8 (275, 290, 320 and 331 bp and two unique alleles were found for Cm1A11 loci (alleles 270 and 276 bp and Cm1H8 (alleles 275 and 331 bp. In broodstock B, ten alleles were produced, the same alleles of the first stock except for alleles 270 and 276 bp in Cm1A11 locus and 275 and 331 bp in Cm1H8 locus. Broodstock A revealed low frequency alleles in Cm1A11 loci, Cm1C8, Cm1F4 and Cm1H8, whereas broodstock B had no locus with low allelic frequency. Loci Cm1A11, Cm1C8 and Cm1H8 exhibited significant deficit of heterozygotes in both broodstocks, revealing changes in Hardy-Weinberg equilibrium. Genetic diversity between stocks was 0.1120, whilst genetic similarity was 0.894, with FST rate = 0.05, and Nm = 3.93, indicating gene flow between the two broodstocks. Results show that broodstocks are genetically closely related, with no great genetic variability. Strategies such as a previous genetic analysis of breeding with its marking, use of a large Ne crossing between the most genetically divergent specimens, and the introduction of new

  4. IPEP: The integrated performance evaluation program for the Department of Energy's Office of Environmental Management

    International Nuclear Information System (INIS)

    Lindahl, P.C.; Streets, W.E.; Bass, D.A.

    1995-01-01

    The quality of the analytical data being provided to DOE's Office of Environmental Management (EM) for environmental restoration activities and the extent to which these data meet the data quality objectives are critical in the decision-making process. One of several quality metrics that can be used in evaluating a laboratory is its performance in performance evaluation (PE) programs. In support of DOE's environmental restoration and waste management efforts, EM has been charged with developing and implementing a program to assess the performance of participating laboratories. Argonne National Laboratory (ANL) and DOE's Environmental Measurements Laboratory (EML) and Radiological and Environmental Sciences Laboratory (RESL) have been collaborating on the development and implementation of a comprehensive Integrated Performance Evaluation Program (IPEP) for DOE-wide implementation. The IPEP will use results from existing inorganic, organic, and radiological PE programs when these are available and appropriate for the analytes and matrices being determined for DOE's EM activities. Existing programs include the U.S. Environmental Protection Agency's (EPA's) Contract Laboratory Program (CLP), the Water Supply (WS) and Water Pollution (WP) PE studies for inorganic and organic analytes, and DOE's Quality Assessment Program (QAP) for radiological analytes. In addition, DOE has begun the development of the Mixed Analyte Performance Evaluation Program (MAPEP) to address the needs of the DOE Complex. These PE programs provide a spectrum of matrices and analytes covering the various inorganic, organic, and low-level radiologic categories found in routine environmental and waste samples. These PE programs already provide some assessment of laboratory performance; IPEP will expand these assessments by evaluating historical performance, as well as results from multiple PE programs, thereby providing an enhanced usage of the PE program information

  5. Review of the nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Hatcher, S.R.

    1980-06-01

    Progress over the previous year in the nuclear fuel waste management program is reviewed. Universities, industry and consultants have become increasingly involved, and the work is being overseen by a Technical Advisory Committee. The program has also been investigated by Ontario's Porter Commission and Select Committe on Ontario Hydro Affairs. A public information program has been extended to cover most of the Canadian Shield region of Ontario. Ontario Hydro is studying spent fuel storage and transportation, while AECL is covering immobilization of spent fuel or processing wastes, geotechnical and geochemical research in the laboratory and in the field, design of disposal facilities, and environmental and safety assessments. (L.L.)

  6. A classification of components of workplace disability management programs

    DEFF Research Database (Denmark)

    Gensby, U; Labriola, Merete; Irvin, E

    2014-01-01

    Purpose: This paper presents results from a Campbell systematic review on the nature and effectiveness of workplace disability management programs (WPDM) promoting return to work (RTW), as implemented and practiced by employers. A classification of WPDM program components, based on the review...... were conducted in pairs of reviewers. Studies were clustered around various dimensions of the design and context of programs. Results: 16,932 records were identified by the initial search. 599 papers were assessed for relevance. Thirteen studies met inclusion criteria. Twelve peer reviewed articles...

  7. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    International Nuclear Information System (INIS)

    Early, T.O.

    1994-05-01

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants

  8. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Early, T.O.

    1994-05-01

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

  9. Economic effectiveness of disease management programs: a meta-analysis.

    Science.gov (United States)

    Krause, David S

    2005-04-01

    The economic effectiveness of disease management programs, which are designed to improve the clinical and economic outcomes for chronically ill individuals, has been evaluated extensively. A literature search was performed with MEDLINE and other published sources for the period covering January 1995 to September 2003. The search was limited to empirical articles that measured the direct economic outcomes for asthma, diabetes, and heart disease management programs. Of the 360 articles and presentations evaluated, only 67 met the selection criteria for meta-analysis, which included 32,041 subjects. Although some studies contained multiple measurements of direct economic outcomes, only one average effect size per study was included in the meta-analysis. Based on the studies included in the research, a meta-analysis provided a statistically significant answer to the question of whether disease management programs are economically effective. The magnitude of the observed average effect size for equally weighted studies was 0.311 (95% CI = 0.272-0.350). Statistically significant differences of effect sizes by study design, disease type and intensity of disease management program interventions were not found after a moderating variable, disease severity, was taken into consideration. The results suggest that disease management programs are more effective economically with severely ill enrollees and that chronic disease program interventions are most effective when coordinated with the overall level of disease severity. The findings can be generalized, which may assist health care policy makers and practitioners in addressing the issue of providing economically effective care for the growing number of individuals with chronic illness.

  10. Severe accident management program at Cofrentes Nuclear Power Plant

    International Nuclear Information System (INIS)

    Borondo, L.; Serrano, C.; Fiol, M.J.; Sanchez, A.

    2000-01-01

    Cofrentes Nuclear Power Plant (GE BWR/6) has implemented its specific Severe Accident Management Program within this year 2000. New organization and guides have been developed to successfully undertake the management of a severe accident. In particular, the Technical Support Center will count on a new ''Severe Accident Management Team'' (SAMT) which will be in charge of the Severe Accident Guides (SAG) when Control Room Crew reaches the Emergency Operation Procedures (EOP) step that requires containment flooding. Specific tools and training have also been developed to help the SAMT to mitigate the accident. (author)

  11. Quality programs for waste management research and development

    International Nuclear Information System (INIS)

    Hood, F.C.

    1990-01-01

    This paper deals with the application of total quality management principles to waste management research and development activities at PNL. The PNL Quality Program has evolved with expanding expectations for 'error-free' performance from the client and the public sector; it describes the management controls needed to achieve desired levels of product quality and to verify they are reached. It includes the definition of work requirements, performance objectives, roles and responsibilities, performance indicators and measurement, performance feedback mechanisms, and process improvement methodologies. (orig.)

  12. Adaptation of an asthma management program to a small clinic.

    Science.gov (United States)

    Kwong, Kenny Yat-Choi; Redjal, Nasser; Scott, Lyne; Li, Marilyn; Thobani, Salima; Yang, Brian

    2017-07-01

    Asthma management programs, such as the Breathmobile program, have been extremely effective in reducing asthma morbidity and increasing disease control; however, their high start-up costs may preclude their implementation in smaller health systems. In this study, we extended validated asthma disease management principles from the Breathmobile program to a smaller clinic system utilizing existing resources and compared clinical outcomes. Cox-regression analyses were conducted to determine the cumulative probability that a new patient entering the program would achieve improved clinical control of asthma with each subsequent visit to the program. A weekly asthma disease management clinic was initiated in an existing multi-specialty pediatric clinic in collaboration with the Breathmobile program. Existing nursing staff was utilized in conjunction with an asthma specialist provider. Patients were referred from a regional healthcare maintenance organization and patients were evaluated and treated every 2 months. Reduction in emergency department (ED) visits and hospitalizations, and improvements in asthma control were assessed at the end of 1 year. A total of 116 patients were enrolled over a period of 1 year. Mean patient age was 6.4 years at the time of their first visit. Patient ethnicity was self-described predominantly as Hispanic or African American. Initial asthma severity for most patients, classified in accordance with national guidelines, was "moderate persistent." After 1 year of enrollment, there was a 69% and 92% reduction in ED/urgent care visits and hospitalizations, respectively, compared with the year before enrollment. Up to 70% of patients achieved asthma control by the third visit. Thirty-six different patients were seen during 1 year for a total of $15,938.70 in contracted reimbursements. A large-scale successful asthma management program can be adapted to a stationary clinic system and achieve comparable results.

  13. A Meta-Analysis of the Effects of Classroom Management Strategies and Classroom Management Programs on Students' Academic, Behavioral, Emotional, and Motivational Outcomes

    Science.gov (United States)

    Korpershoek, Hanke; Harms, Truus; de Boer, Hester; van Kuijk, Mechteld; Doolaard, Simone

    2016-01-01

    This meta-analysis examined which classroom management strategies and programs enhanced students' academic, behavioral, social-emotional, and motivational outcomes in primary education. The analysis included 54 random and nonrandom controlled intervention studies published in the past decade (2003-2013). Results showed small but significant…

  14. 77 FR 47302 - South Dakota: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-08-08

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... EPA proposed to authorize South Dakota's State Hazardous waste management Program revisions published... to the hazardous waste program revisions submitted by South Dakota. The Agency published a Proposed...

  15. Overview of the NRC nuclear waste management program

    International Nuclear Information System (INIS)

    Malaro, J.C.

    1976-01-01

    The NRC has firmly established waste management as a high-priority effort and has made the commitment to act rapidly and methodically to establish a sound regulatory base for licensing waste management activities. We believe the priorities for NRC work in waste management are consistent with the needs of the overall national waste management program. Present licensing procedures and criteria are adequate for the short term, and priority attention is being given to the longer term, when the quantities of waste to be managed will be greater and licensing demands will increase. Recognizing that its decision will affect industry, other governmental jurisdictions, private interest groups, and the public at large, NRC has encouraged and will continue to encourage their participation in planning our program. We also recognize that the problems of nuclear waste management are international in scope. Many waste management problems (e.g., potential for contamination of oceans and atmosphere, need for isolation of some wastes for longer periods than governments and political boundaries have remained stable in the past), require a set of internationally acceptable and accepted solutions. The wastes from the U.S. nuclear industry will account for only about one third of the nuclear waste generated in the world. Therefore, we propose to cooperate and where appropriate take the lead in establishing acceptable worldwide policies, standards and procedures for handling nuclear wastes

  16. 77 FR 59758 - Idaho: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2012-10-01

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection..., (RCRA), allows the Environmental Protection Agency (EPA) to authorize State hazardous waste management... codification of the authorized Idaho hazardous waste management program and incorporates by reference...

  17. 75 FR 76633 - Oregon; Correction of Federal Authorization of the State's Hazardous Waste Management Program

    Science.gov (United States)

    2010-12-09

    ...; Correction of Federal Authorization of the State's Hazardous Waste Management Program AGENCY: Environmental... its federally authorized RCRA Hazardous Waste Management Program. These authorized changes included... with Conditionally Exempt Small Quality Generators (CESQG) waste is subject to RCRA used oil management...

  18. 76 FR 18220 - Labor-Management Cooperation Grant Program Information Collection Request

    Science.gov (United States)

    2011-04-01

    ... FEDERAL MEDIATION AND CONCILIATION SERVICE Labor-Management Cooperation Grant Program Information... submission of the following public information collection request (ICR) to the Office of Management and...-13). This information collection, ``Labor-Management Cooperation Grant Program Information Collection...

  19. The analysis of the program to develop the Nuclear Waste Management System: Allocated requirements for the Office of Civilian Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    Woods, T.W.

    1991-09-01

    This report is volume 3, part B, of the program to satisfy the allocated requirements of the Office of Civilian Radioactive Waste Management Program, in the development of the nuclear waste management system. The report is divided into the following sections: regulatory compliance; external relations; international programs; strategic and contingency planning; contract business management; and administrative services. (CS)

  20. 42 CFR 423.153 - Drug utilization management, quality assurance, and medication therapy management programs (MTMPs).

    Science.gov (United States)

    2010-10-01

    ... PRESCRIPTION DRUG BENEFIT Cost Control and Quality Improvement Requirements § 423.153 Drug utilization... 42 Public Health 3 2010-10-01 2010-10-01 false Drug utilization management, quality assurance, and medication therapy management programs (MTMPs). 423.153 Section 423.153 Public Health CENTERS FOR MEDICARE...