WorldWideScience

Sample records for enhancement plan final

  1. Wildlife Protection, Mitigation and Enhancement Planning for Grand Coulee Dam, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Creveling, Jennifer

    1986-08-01

    The development and operation of Grand Coulee Dam inundated approximately 70,000 acres of wildlife habitat under the jurisdictions of the Colville Confederated Tribes, the Spokane Tribe, and the State of Washington. Under the provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, this study reviews losses to wildlife and habitat, and proposes mitigation for those losses. Wildlife loss estimates were developed from information available in the literature. Habitat losses and potential habitat gains through mitigation were estimated by a modified Habitat Evaluation Procedure. The mitigation plan proposes (1) acquisition of sufficient land or management rights to land to protect Habitat Units equivalent to those lost (approximately 73,000 acres of land would be required), (2) improvement and management of those lands to obtain and perpetuate target Habitat Units, and (3) protection and enhancement of suitable habitat for bald eagles. Mitigation is presented as four actions to be implemented over a 10-year period. A monitoring program is proposed to monitor mitigation success in terms of Habitat Units and wildlife population trends.

  2. Enhanced sludge washing evaluation plan

    Energy Technology Data Exchange (ETDEWEB)

    Jensen, R.D.

    1994-09-01

    The Tank Waste Remediation System (TWRS) Program mission is to store, treat, and immobilize highly radioactive Hanford Site waste (current and future tank waste and the strontium/cesium capsules) in an environmentally sound, safe, and cost-effective manner. The scope of the TWRS Waste Pretreatment Program is to treat tank waste and separate that waste into HLW and LLW fractions and provide additional treatment as required to feed LLW and HLW immobilization facilities. Enhanced sludge washing was chosen as the baseline process for separating Hanford tank waste sludge. Section 1.0 briefly discusses the purpose of the evaluation plan and provides the background that led to the choice of enhanced sludge washing as the baseline process. Section 2.0 provides a brief summary of the evaluation plan details. Section 3.0 discusses, in some detail, the technical work planned to support the evaluation of enhanced sludge washing. Section 4.0 briefly discusses the potential important of policy issues to the evaluation. Section 5.0 discusses the methodology to be used in the evaluation process. Section 6.0 summarizes the milestones that have been defined to complete the enhanced sludge washing evaluation and provides a summary schedule to evaluate the performance of enhanced sludge washing. References are identified in Section 7.0, and additional schedule and milestone information is provided in the appendices.

  3. Enhanced sludge washing evaluation plan

    International Nuclear Information System (INIS)

    Jensen, R.D.

    1994-09-01

    The Tank Waste Remediation System (TWRS) Program mission is to store, treat, and immobilize highly radioactive Hanford Site waste (current and future tank waste and the strontium/cesium capsules) in an environmentally sound, safe, and cost-effective manner. The scope of the TWRS Waste Pretreatment Program is to treat tank waste and separate that waste into HLW and LLW fractions and provide additional treatment as required to feed LLW and HLW immobilization facilities. Enhanced sludge washing was chosen as the baseline process for separating Hanford tank waste sludge. Section 1.0 briefly discusses the purpose of the evaluation plan and provides the background that led to the choice of enhanced sludge washing as the baseline process. Section 2.0 provides a brief summary of the evaluation plan details. Section 3.0 discusses, in some detail, the technical work planned to support the evaluation of enhanced sludge washing. Section 4.0 briefly discusses the potential important of policy issues to the evaluation. Section 5.0 discusses the methodology to be used in the evaluation process. Section 6.0 summarizes the milestones that have been defined to complete the enhanced sludge washing evaluation and provides a summary schedule to evaluate the performance of enhanced sludge washing. References are identified in Section 7.0, and additional schedule and milestone information is provided in the appendices

  4. 76 FR 61379 - Final Recovery Plan, Bexar County Karst Invertebrates

    Science.gov (United States)

    2011-10-04

    ...] Final Recovery Plan, Bexar County Karst Invertebrates AGENCY: Fish and Wildlife Service, Interior... availability of our final recovery plan, for the nine Bexar County Karst Invertebrates under the Endangered... County karst invertebrates were listed as endangered species on December 26, 2000 (65 FR 81419): Rhadine...

  5. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  6. Claims Procedure for Plans Providing Disability Benefits. Final rule.

    Science.gov (United States)

    2016-12-19

    This document contains a final regulation revising the claims procedure regulations under the Employee Retirement Income Security Act of 1974 (ERISA) for employee benefit plans providing disability benefits. The final rule revises and strengthens the current rules primarily by adopting certain procedural protections and safeguards for disability benefit claims that are currently applicable to claims for group health benefits pursuant to the Affordable Care Act. This rule affects plan administrators and participants and beneficiaries of plans providing disability benefits, and others who assist in the provision of these benefits, such as third-party benefits administrators and other service providers.

  7. Tax treatment of cafeteria plans. Internal Revenue Service (IRS), Treasury. Final regulations.

    Science.gov (United States)

    2000-03-23

    This document contains final regulations relating to section 125 cafeteria plans. The final regulations clarify the circumstances under which a section 125 cafeteria plan election may be changed. The final regulations permit an employer to allow a section 125 cafeteria plan participant to revoke an existing election and make a new election during a period of coverage for accident or health coverage or group-term life insurance coverage.

  8. 76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013

    Science.gov (United States)

    2011-03-31

    ... [Docket No. NHTSA-2009-0108] Final Vehicle Safety Rulemaking and Research Priority Plan 2011- 2013 AGENCY... availability. SUMMARY: This document announces the availability of the Final NHTSA Vehicle Safety and Fuel.... This Priority Plan is an update to the Final Vehicle Safety Rulemaking and Research Priority Plan 2009...

  9. Final Action Plan to Tiger Team

    International Nuclear Information System (INIS)

    1992-01-01

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit

  10. Enhancing Cassini Operations & Science Planning Tools

    Science.gov (United States)

    Castello, Jonathan

    2012-01-01

    The Cassini team uses a variety of software utilities as they manage and coordinate their mission to Saturn. Most of these tools have been unchanged for many years, and although stability is a virtue for long-lived space missions, there are some less-fragile tools that could greatly benefit from modern improvements. This report shall describe three such upgrades, including their architectural differences and their overall impact. Emphasis is placed on the motivation and rationale behind architectural choices rather than the final product, so as to illuminate the lessons learned and discoveries made.These three enhancements included developing a strategy for migrating Science Planning utilities to a new execution model, rewriting the team's internal portal for ease of use and maintenance, and developing a web-based agenda application for tracking the sequence of files being transmitted to the Cassini spacecraft. Of this set, the first two have been fully completed, while the agenda application is currently in the early prototype stage.

  11. Project No. 8 - Final decommissioning plan

    International Nuclear Information System (INIS)

    2000-01-01

    Ignalina NPP should prepare the final Ignalina NPP unit 1 decommissioning plan by march 31, 2002. This plan should include the following : description of Ignalina NPP and the Ignalina NPP boundary that could be influenced by decommissioning process; decommissioning strategy selected and a logical substantiation for this selection; description of the decommissioning actions suggested and a time schedule for the actions to be performed; conceptual safety and environmental impact assessment covering ionizing radiation and other man and environment impact; description of the environmental monitoring program proposed during decommissioning process; description of the waste management proposed; assessment of decommissioning expenses including waste management, accumulated funds and other sources. Estimated project cost - 0.75 M EURO

  12. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Science.gov (United States)

    2010-11-24

    ... management under alternative B would be to enable visitor participation in a wide variety of outdoor... DEPARTMENT OF THE INTERIOR National Park Service [2031-A046-409] General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental Impact Statement, Big Cypress National...

  13. 76 FR 68503 - Winter Use Plan, Final Environmental Impact Statement, Yellowstone National Park, Idaho, Montana...

    Science.gov (United States)

    2011-11-04

    ... DEPARTMENT OF THE INTERIOR National Park Service Winter Use Plan, Final Environmental Impact.... ACTION: Notice of availability of the Final Environmental Impact Statement for the Winter Use Plan... Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and [[Page 68504

  14. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Science.gov (United States)

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  15. 77 FR 74027 - Winter Use Plan, Final Environmental Impact Statement Amended Record of Decision, Yellowstone...

    Science.gov (United States)

    2012-12-12

    ...] Winter Use Plan, Final Environmental Impact Statement Amended Record of Decision, Yellowstone National... Availability of Amended Record of Decision for the Final Environmental Impact Statement for a Winter Use Plan... Record of Decision for the Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and...

  16. Federal Employees Health Benefits Program: Enrollment Options Following the Termination of a Plan or Plan Option. Final rule.

    Science.gov (United States)

    2015-10-28

    The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding enrollment options following the termination of a plan or plan option.

  17. FOCUS: a fire management planning system -- final report

    Science.gov (United States)

    Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey

    1981-01-01

    FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...

  18. Hawaii State Plan for Occupational Safety and Health. Final rule.

    Science.gov (United States)

    2012-09-21

    This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.

  19. Liquid effluent retention facility final-status groundwater monitoring plan

    International Nuclear Information System (INIS)

    Sweeney, M.D.; Chou, C.J.; Bjornstad, B.N.

    1997-09-01

    The following sections describe the groundwater-monitoring program for the Liquid Effluent Retention Facility (LERF). The LERF is regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). The LERF is included in the open-quotes Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, Permit WA890008967close quotes, (referred to herein as the Permit) (Ecology 1994) and is subject to final-status requirements for groundwater monitoring (WAC 173-303-645). This document describes a RCRA/WAC groundwater detection-monitoring program for groundwater in the uppermost aquifer system at the LERF. This plan describes the LERF monitoring network, constituent list, sampling schedule, statistical methods, and sampling and analysis protocols that will be employed for the LERF. This plan will be used to meet the groundwater monitoring requirements from the time the LERF becomes part of the Permit and through the post-closure care period, until certification of final closure

  20. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Science.gov (United States)

    2011-04-29

    ... DEPARTMENT OF THE INTERIOR National Park Service [2310-0003-422] Coral Reef Restoration Plan... for the Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National... availability of a Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan (Plan...

  1. Contextualising the National Development Plan for enhanced ...

    African Journals Online (AJOL)

    ... and Development. Strategy, Integrated Development Planning, enhanced service delivery .... Penderis (2012: 7) proffers that there is a vast body of ..... the various chapters, objectives and actions of the ..... financing and formulation of the ten.

  2. Enhancing Student’s Understanding in Entrepreneurship Through Business Plan Simulation

    Directory of Open Access Journals (Sweden)

    Guzairy M.

    2018-01-01

    Full Text Available Business Plan is an important document for entrepreneurs to guide them managing their business. Business Plan also assist the entrepreneur to strategies their business and manage future growth. That is why Malaysian government has foster all Higher Education Provider to set entrepreneurship education as compulsory course. One of the entrepreneurship education learning outcome is the student can write effective business plan. This study focused on enhancing student’s understanding in entrepreneurship through business plan simulation. This study also considers which of the factor that most facilitate the business simulation that help the student to prepare effective business plan. The methodology of this study using quantitative approach with pre-and post-research design. 114 students take part as respondent in the business simulation and answer quantitative survey pre-question and post question. The crucial findings of this study are student characteristic factor after playing the simulation contribute much on facilitate business plan learning. The result has shown that the business plan simulation can enhance undergraduate student in understanding entrepreneurship by preparing effective business plan before opening new startup.

  3. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  4. Burlington Bottoms Wildlife Mitigation Project. Final environmental assessment/management plan and finding of no significant impact

    International Nuclear Information System (INIS)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property

  5. 76 FR 75556 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2011-12-02

    ...] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Taos Field Office, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of...) has prepared the Proposed Resource Management Plan/Final Environmental Impact Statement (Proposed RMP...

  6. 77 FR 23747 - Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

    Science.gov (United States)

    2012-04-20

    ... Management Plan (RMP)/Final Environmental Impact Statement (EIS) for the John Day Basin planning area and by... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORP0000.16100000.DQ0000 LXSS053H0000 HAG10-0234] Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

  7. The Rosetta Science Archive: Status and Plans for Completing and Enhancing the Archive Content

    Science.gov (United States)

    Heather, D.; Barthelemy, M.; Fraga, D.; Grotheer, E.; O'Rourke, L.; Taylor, M.

    2017-09-01

    On 30 September 2016, Rosetta's signal flat-lined, confirming that the spacecraft had completed its incredible mission by landing on the surface of Comet 67P/Churyumov-Gerasimenko. Although this marked an end to the spacecraft's active operations, intensive work is still on-going with instrument teams preparing their final science data increments for delivery and ingestion into ESA's Planetary Science Archive (PSA). In addition to this, ESA is establishing contracts with a number of instrument teams to enhance and improve their data and documentation in an effort to provide the best long- term archive possible for the Rosetta mission. This presentation will outline the current status of the Rosetta archive, as well as highlighting some of the 'enhanced archiving' activities planned and underway with the various instrument teams on Rosetta to ensure the scientific legacy of the mission.

  8. Does strategic planning enhance or impede innovation and firm performance

    NARCIS (Netherlands)

    Song, Michael; Im, Subin; van der Bijl, H.M.; Song, Lisa Z.

    2011-01-01

    Does strategic planning enhance or impede innovation and firm performance? The current literature provides contradictory views. This study extends the resource-advantage theory to examine the conditions in which strategic planning increases or decreases the number of new product development projects

  9. Does strategic planning enhance or impede innovation and firm performance?

    NARCIS (Netherlands)

    Song, Michael; Im, Subin; van der Bij, Hans; Song, Lisa Z.

    Does strategic planning enhance or impede innovation and firm performance? The current literature provides contradictory views. This study extends the resource-advantage theory to examine the conditions in which strategic planning increases or decreases the number of new product development projects

  10. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Science.gov (United States)

    2010-03-05

    ... DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final Environmental Impact... Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the National... the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona. On January...

  11. 76 FR 77249 - Winter Use Plan, Final Environmental Impact Statement Record of Decision, Yellowstone National...

    Science.gov (United States)

    2011-12-12

    ... DEPARTMENT OF THE INTERIOR National Park Service Winter Use Plan, Final Environmental Impact... Impact Statement for a Winter Use Plan, Yellowstone National Park. SUMMARY: Pursuant to Sec. 102(2)(C) of... Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and Wyoming. On December 5...

  12. Enhancing Student’s Understanding in Entrepreneurship Through Business Plan Simulation

    OpenAIRE

    Guzairy M.; Mohamad N.; Yunus A.R.

    2018-01-01

    Business Plan is an important document for entrepreneurs to guide them managing their business. Business Plan also assist the entrepreneur to strategies their business and manage future growth. That is why Malaysian government has foster all Higher Education Provider to set entrepreneurship education as compulsory course. One of the entrepreneurship education learning outcome is the student can write effective business plan. This study focused on enhancing student’s understanding in entrepren...

  13. 75 FR 43329 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal...

    Science.gov (United States)

    2010-07-23

    ... 45 CFR Part 147 Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to... Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal Claims and... of Labor; Office of Consumer Information and Insurance Oversight, Department of Health and Human...

  14. Nevada State plan; final approval determination. Occupational Safety and Health Administration (OSHA), U.S. Department of Labor. Final State plan approval--Nevada.

    Science.gov (United States)

    2000-04-18

    This document amends OSHA's regulations to reflect the Assistant Secretary's decision granting final approval to the Nevada State plan. As a result of this affirmative determination under section 18(e) of the Occupational Safety and Health Act of 1970, Federal OSHA's standards and enforcement authority no longer apply to occupational safety and health issues covered by the Nevada plan, and authority for Federal concurrent jurisdiction is relinquished. Federal enforcement jurisdiction is retained over any private sector maritime employment, private sector employers on Indian land, and any contractors or subcontractors on any Federal establishment where the land is exclusive Federal jurisdiction. Federal jurisdiction remains in effect with respect to Federal government employers and employees. Federal OSHA will also retain authority for coverage of the United States Postal Service (USPS), including USPS employees, contract employees, and contractor-operated facilities engaged in USPS mail operations.

  15. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-10-01

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planning process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.

  16. Plan for advanced microelectronics processing technology application. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Goland, A.N.

    1990-10-01

    The ultimate objective of the tasks described in the research agreement was to identify resources primarily, but not exclusively, within New York State that are available for the development of a Center for Advanced Microelectronics Processing (CAMP). Identification of those resources would enable Brookhaven National Laboratory to prepare a program plan for the CAMP. In order to achieve the stated goal, the principal investigators undertook to meet the key personnel in relevant NYS industrial and academic organizations to discuss the potential for economic development that could accompany such a Center and to gauge the extent of participation that could be expected from each interested party. Integrated of these discussions was to be achieved through a workshop convened in the summer of 1990. The culmination of this workshop was to be a report (the final report) outlining a plan for implementing a Center in the state. As events unfolded, it became possible to identify the elements of a major center for x-ray lithography on Lone Island at Brookhaven National Laboratory. The principal investigators were than advised to substitute a working document based upon that concept in place of a report based upon the more general CAMP workshop originally envisioned. Following that suggestion from the New York State Science and Technology Foundation, the principals established a working group consisting of representatives of the Grumman Corporation, Columbia University, the State University of New York at Stony Brook, and Brookhaven National Laboratory. Regular meetings and additional communications between these collaborators have produced a preproposal that constitutes the main body of the final report required by the contract. Other components of this final report include the interim report and a brief description of the activities which followed the establishment of the X-ray Lithography Center working group.

  17. Final rules relating to use of electronic communication and recordkeeping technologies by employee pension and welfare benefit plans. Notice of final rulemaking.

    Science.gov (United States)

    2002-04-09

    This document contains final rules under Title I of the Employee Retirement Income Security Act of 1974, as amended (ERISA), concerning the disclosure of certain employee benefit plan information through electronic media, and the maintenance and retention of employee benefit plan records in electronic form. The rules establish a safe harbor pursuant to which all pension and welfare benefit plans covered by Title I of ERISA may use electronic media to satisfy disclosure obligations under Title I of ERISA. The rules also provide standards concerning the use of electronic media in the maintenance and retention of records required by sections 107 and 209 of ERISA. The rules affect employee pension and welfare benefit plans, including group health plans, plan sponsors, administrators and fiduciaries, and plan participants and beneficiaries.

  18. Iskuulpa Watershed Management Plan : A Five-Year Plan for Protecting and Enhancing Fish and Wildlife Habitats in the Iskuulpa Watershed.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2003-01-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to protect, enhance, and mitigate wildlife and wildlife habitat and watershed resources in the Iskuulpa Watershed. The Iskuulpa Watershed Project was approved as a Columbia River Basin Wildlife Fish and Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1998. Iskuulpa will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the John Day and McNary Hydroelectric facilities on the Columbia River. By funding the enhancement and operation and maintenance of the Iskuulpa Watershed, BPA will receive credit towards their mitigation debt. The purpose of the Iskuulpa Watershed management plan update is to provide programmatic and site-specific standards and guidelines on how the Iskuulpa Watershed will be managed over the next three years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management.

  19. 76 FR 71598 - Pearl Harbor National Wildlife Refuge, Honolulu County, HI; Final Comprehensive Conservation Plan...

    Science.gov (United States)

    2011-11-18

    ...] Pearl Harbor National Wildlife Refuge, Honolulu County, HI; Final Comprehensive Conservation Plan and.../docs/HI-PI/docsjcpearl.htm . Email: [email protected] . Include ``Pearl Harbor final CCP'' in...`iwa, HI 96712. FOR FURTHER INFORMATION CONTACT: David Ellis, Project Leader, (808) 637-6330...

  20. Enhancing public participation in natural resource management using Soft OR - an application of strategic option development and analysis in tactical forest planning

    DEFF Research Database (Denmark)

    Hjortsø, Carsten Nico Portefée

    2004-01-01

    This article presents a case study where a modified version of strategic option development and analysis (SODA) is applied to enhance the level of citizens’ participation in a strategic forest management planning process managed by the Danish Forest and Nature Agency. The case is interesting...... because of structural differences between traditional Soft OR and public participation settings. Research shows that SODA can nevertheless improve public involvement in several ways, including stakeholders’ perception of being involved, stakeholders’ commitment, structuring of the planning context......, communication of stakeholder perspectives, identification and management of conflicts, decision process transparency, and agency accountability for final planning outcomes. The primary problems encountered relate to the difficulty of reading the cognitive maps, time requirements, and selection of facilitator...

  1. 78 FR 16286 - Neal Smith National Wildlife Refuge, Jasper County, IA; Final Comprehensive Conservation Plan and...

    Science.gov (United States)

    2013-03-14

    ...-FF03R06000] Neal Smith National Wildlife Refuge, Jasper County, IA; Final Comprehensive Conservation Plan and... the Environmental Assessment (EA) for Neal Smith National Wildlife Refuge (Refuge, NWR). In this final... . Include ``Neal Smith Final CCP'' in the subject line of the message. U.S. Mail: Neal Smith National...

  2. Proposals for enhancing tactical planning in grocery retailing with S&OP

    DEFF Research Database (Denmark)

    Dreyer, Heidi Carin; Kiil, Kasper; Dukovska-Popovska, Iskra

    2018-01-01

    Purpose-The purpose of this paper is to explore tactical planning in grocery retailing and propose how process and integration mechanisms from sales and operations planning (S&OP) can enhance retail tactical planning.Design/methodology/approach-This work follows an explorative design with case...... studies from the grocery retailing industry in Finland, Norway, and the UK.Findings-The tactical planning process focuses on demand management and securing product availability from suppliers in order to reach sales targets. Less attention is directed toward balancing supply and demand or toward providing...... a single plan to guide company operations. Planning appeared to be functionally oriented with limited coordination between functional plans, but it did include external integration that improved forecast accuracy.Research limitations/implications-The study involves grocery retailer cases with variable...

  3. Technical planning activity: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  4. Technical planning activity: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements

  5. 75 FR 27121 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Dependent...

    Science.gov (United States)

    2010-05-13

    ... 45 CFR Parts 144, 146, and 147 Group Health Plans and Health Insurance Issuers Relating to Dependent... 144, 146, and 147 RIN 0991-AB66 Interim Final Rules for Group Health Plans and Health Insurance... requirements for group health plans and health insurance issuers in the group and individual markets under...

  6. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  7. City of North Vancouver greenhouse gas local action plan : final report

    International Nuclear Information System (INIS)

    Hood, I.

    2005-02-01

    This paper presented details of a greenhouse gas (GHG) local action plan developed as a result of the City of North Vancouver's participation in the Partners for Climate Protection Program (PCPP). The plan is intended to better manage the impacts of urban development related to GHG and air quality, while also achieving community objectives related to affordable housing, transportation management, job creation and economic development. The report reviewed the local emissions inventory in addition to various programs, plans, policies and by-laws relating to energy management. Potential policies and programs were identified to achieve GHG emissions reductions in accordance with the PCPP. A plan for emissions reductions was also presented. A situation analysis was presented with details of population, transportation, residential and commercial building and industry. Solid waste management and transportation plans were outlined. A GHG emissions profile and forecast was presented. An outline of a GHG management framework included information on initiatives in the city as well as details of public consultation feedback. A program implementation plan includes forecasts of the program's impact, as well as details of program delivery and a performance measurement framework. Proposed initiatives in the plan included new building guidelines; fuel switching for light and heavy duty vehicles; driver training and enhanced vehicle maintenance programs; and, an environmental procurement policy. Community programs include residential and commercial building retrofits; land use planning; support for community energy systems; green building design guidelines; transportation demand management; and, public engagement and outreach programs. 21 tabs., 9 figs

  8. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2013-02-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000 L16100000.DQ0000 LXSS04 K0000] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land Management, Interior. ACTION...

  9. Summary of strategies for planning Productivity Improvement and Quality Enhancement (PIQE)

    Science.gov (United States)

    1986-01-01

    The Summary of NASA Strategies for Productivity Improvement and Quality Enhancement respond to NASA's eighth top goal: Establish NASA as a leader in the development and application of advanced technology and management practices which contribute to significant increases in both Agency and national productivity. The Strategies provide the framework for development of the agency-wide Productivity Improvement and Quality Enhancement (PIQE) Plans.

  10. 77 FR 51044 - Laguna Cartagena National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding...

    Science.gov (United States)

    2012-08-23

    ... download the document from our Internet Site: http://southeast.fws.gov/planning/ under ``Final Documents... facilities and programs will be expanded. Specifically, improving parking areas, providing additional...

  11. Environmental Development Plan (EDP). Enhanced gas recovery, FY 1977

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-01

    This Enhanced Gcs Recovery EDP addresses the environmental impacts of enhanced gas recovery processes in shale and sandstone, methane drainage from coalbeds, and methane recovery from geopressured aquifers. The EDP addresses planning in two basic areas: environmental research and environmental assessment. Environmental research can be categorized as follows: characterization of pollutants from EGR processes; selective application of monitoring and measuring techniques; evaluation of control/mitigation techniques; and evaluation of the synergistic impacts of the development of EGR techniques. Environmental assessment activities scheduled by EDP include: assessment of ecological impacts; assessment of socioeconomic effects; EIA/EIS preparation; evaluation of control technology needs; and analysis of applicable and proposed emission, effluent, and health and safety standards. The EGR EDP includes an EGR technology overview (Section 2), a discussion of EGR environmental issues and requirements (Section 3), an environmental action plan (Section 4), an environmental management strategy for the EGR program (Section 5), and supporting appendices which present information on Federal legislation applicable to EGR technology, a summary of ongoing and completed research, and future research and assessment projects.

  12. Managing environmental enhancement plans for individual research projects at a national primate research center.

    Science.gov (United States)

    Thom, Jinhee P; Crockett, Carolyn M

    2008-05-01

    We describe a method for managing environmental enhancement plans for individual research projects at a national primate research center where most monkeys are assigned to active research projects. The Psychological Well-being Program (PWB) at the University of Washington National Primate Research Center developed an Environmental Enhancement Plan form (EEPL) that allows PWB to quantify and track changes in enrichment allowances over time while ensuring that each animal is provided with as much enrichment as possible without compromising research. Very few projects involve restrictions on toys or perches. Some projects have restrictions on food treats and foraging, primarily involving the provision of these enrichments by research staff instead of husbandry staff. Restrictions are not considered exemptions unless they entirely prohibit an element of the University of Washington Environmental Enhancement Plan (UW EE Plan). All exemptions must be formally reviewed and approved by the institutional animal care and use committee. Most exemptions from elements of the UW EE Plan involve social housing. Between 2004 and 2006, the percentage of projects with no social contact restrictions increased by 1%, but those prohibiting any tactile social contact declined by 7%, and projects permitting tactile social contact during part of the study increased by 9%. The EEPL form has facilitated informing investigators about the enrichment their monkeys will receive if no restrictions or exemptions are requested and approved. The EEPL form also greatly enhances PWB's ability to coordinate the specific enrichment requirements of a project.

  13. 75 FR 69709 - Office of New Reactors; Notice of Availability of the Final Staff Guidance; Standard Review Plan...

    Science.gov (United States)

    2010-11-15

    ... the Final Staff Guidance; Standard Review Plan, Section 13.6.6, Revision 0 on Cyber Security Plan... Reports for Nuclear Power Plants,'' Section 13.6.6, Revision 0 on ``Cyber Security Plan'' (Agencywide... reviews to amendments to licenses for operating reactors or for activities associated with review of...

  14. National plan to enhance aviation safety through human factors improvements

    Science.gov (United States)

    Foushee, Clay

    1990-01-01

    The purpose of this section of the plan is to establish a development and implementation strategy plan for improving safety and efficiency in the Air Traffic Control (ATC) system. These improvements will be achieved through the proper applications of human factors considerations to the present and future systems. The program will have four basic goals: (1) prepare for the future system through proper hiring and training; (2) develop a controller work station team concept (managing human errors); (3) understand and address the human factors implications of negative system results; and (4) define the proper division of responsibilities and interactions between the human and the machine in ATC systems. This plan addresses six program elements which together address the overall purpose. The six program elements are: (1) determine principles of human-centered automation that will enhance aviation safety and the efficiency of the air traffic controller; (2) provide new and/or enhanced methods and techniques to measure, assess, and improve human performance in the ATC environment; (3) determine system needs and methods for information transfer between and within controller teams and between controller teams and the cockpit; (4) determine how new controller work station technology can optimally be applied and integrated to enhance safety and efficiency; (5) assess training needs and develop improved techniques and strategies for selection, training, and evaluation of controllers; and (6) develop standards, methods, and procedures for the certification and validation of human engineering in the design, testing, and implementation of any hardware or software system element which affects information flow to or from the human.

  15. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2001-09-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such

  16. Master plan study - District heating Sillamaee municipality. Estonia. Final report. Appendices for chapter 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to the final report on the master plan study on district heating in the municipality in Estonia, chapter nine, gives data related to general economic assumptions for financial and economic calculations, fuel consumption, financing, prices, fuel consumption. (ARW)

  17. Computer-aided dispatch--traffic management center field operational test final detailed test plan : WSDOT deployment

    Science.gov (United States)

    2003-10-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...

  18. 75 FR 34537 - Interim Final Rules for Group Health Plans and Health Insurance Coverage Relating to Status as a...

    Science.gov (United States)

    2010-06-17

    ... 45 CFR Part 147 Group Health Plans and Health Insurance Coverage Relating to Status as a... for Group Health Plans and Health Insurance Coverage Relating to Status as a Grandfathered Health Plan... and Insurance Oversight, Department of Health and Human Services. ACTION: Interim final rules with...

  19. Idaho National Engineering Laboratory site development plan

    International Nuclear Information System (INIS)

    1994-09-01

    This plan briefly describes the 20-year outlook for the Idaho National Engineering Laboratory (INEL). Missions, workloads, worker populations, facilities, land, and other resources necessary to fulfill the 20-year site development vision for the INEL are addressed. In addition, the plan examines factors that could enhance or deter new or expanded missions at the INEL. And finally, the plan discusses specific site development issues facing the INEL, possible solutions, resources required to resolve these issues, and the anticipated impacts if these issues remain unresolved

  20. 78 FR 25973 - Final Environmental Impact Statement for the Real Property Master Plan at the Presidio of...

    Science.gov (United States)

    2013-05-03

    ... to improve the learning environment and quality of life at the POM installation. The Final EIS... are also planned to Leadership in Energy and Environmental Design standards to conserve resources. The... the Chamberlain Library on the OMC. An electronic version of the Final EIS can be viewed or downloaded...

  1. Medicare and state health care programs: fraud and abuse, civil money penalties and intermediate sanctions for certain violations by health maintenance organizations and competitive medical plans--HHS. Final rule.

    Science.gov (United States)

    1994-07-15

    This final rule implements sections 9312(c)(2), 9312(f), and 9434(b) of Public Law 99-509, section 7 of Public Law 100-93, section 4014 of Public Law 100-203, sections 224 and 411(k)(12) of Public Law 100-360, and section 6411(d)(3) of Public Law 101-239. These provisions broaden the Secretary's authority to impose intermediate sanctions and civil money penalties on health maintenance organizations (HMOs), competitive medical plans, and other prepaid health plans contracting under Medicare or Medicaid that (1) substantially fail to provide an enrolled individual with required medically necessary items and services; (2) engage in certain marketing, enrollment, reporting, or claims payment abuses; or (3) in the case of Medicare risk-contracting plans, employ or contract with, either directly or indirectly, an individual or entity excluded from participation in Medicare. The provisions also condition Federal financial participation in certain State payments on the State's exclusion of certain prohibited entities from participation in HMO contracts and waiver programs. This final rule is intended to significantly enhance the protections for Medicare beneficiaries and Medicaid recipients enrolled in a HMO, competitive medical plan, or other contracting organization under titles XVIII and XIX of the Social Security Act.

  2. Computer-aided dispatch--traffic management center field operational test final test plans : state of Utah

    Science.gov (United States)

    2004-01-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...

  3. Using Software Applications to Facilitate and Enhance Strategic Planning

    Science.gov (United States)

    1993-09-01

    Angeles, CA 90089-0021 213-743-3083 XIA 2.0 Booz-Allen & Hamilton, Inc. 1953 Gallows Road Vienna, VA 11180 703-893-0040 92 REFERENCES Ansoff , H. Igor ...to doing business was invented ( Ansoff 1984). Two examples of business applications of strategy are generic and competitive strategies (Mintzberg 1991...34 ( Ansoff 1984, p. 188) Keller (1990) states the purpose of the PPBS was "to produce a plan, a program, and, finally a budget for the Department of Defense

  4. Metering Plan: Intelligent Operational Strategies Through Enhanced Metering Systems

    Energy Technology Data Exchange (ETDEWEB)

    Pope, Jason E.

    2016-07-27

    The Sustainability Program at Pacific Northwest National Laboratory (PNNL) has adopted a “triple-bottom-line” approach of environmental stewardship, social responsibility, and economic prosperity to its operations. Metering at PNNL works in support of all three, specifically to measure and inform building energy use and greenhouse gas emissions and minimize water use. The foundation for metering at PNNL is a core goal set, which consists of four objectives: providing accurate data without interruption, analyzing data while it is still new, providing actionable recommendations to operations management, and ensuring PNNL’s compliance with contract metering requirements. These core objectives guide the decisions that we make during annual planning and as we operate throughout the year. This 2016 edition of the Metering Plan conveys the metering practices for and vision of the Sustainability Program. Changes in this plan from the 2015 edition include updated tables and an enhanced discussion on energy tracking systems used at PNNL. This plan also discusses updated benchmarking strategies using PNNL’s graphics and analytics tool, BuildingOS by Lucid Design Group. This plan presents our progress toward the metering goals shared by all federal agencies and highlights our successful completion of metering requirements. Currently, PNNL is fully compliant with the applicable legislative and Executive Order metering requirements. PNNL’s approach to the installation of new meters will be discussed. Perhaps most importantly, this plan details the analysis techniques utilized at PNNL that rely on the endless streams of data newly available as a result of increased meter deployment over the last several years. Previous Metering Plans have documented specific meter connection schemes as PNNL focused on deploying meters in a first step toward managing energy and water use. This plan serves not only to highlight PNNL’s successful completion of agency metering goals, but

  5. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Science.gov (United States)

    2013-02-14

    ... Environmental Assessment for Monitor National Marine Sanctuary: Notice of Public Availability AGENCY: Office of National Marine Sanctuaries (ONMS), National Ocean Service (NOS), National Oceanic and Atmospheric... releasing the final management plan and environmental assessment for Monitor National Marine Sanctuary. DATE...

  6. Hellsgate Winter Range Mitigation Project; Long-term Management Plan, Project Report 1993, Final Draft.

    Energy Technology Data Exchange (ETDEWEB)

    Berger, Matthew T.

    1994-01-01

    A study was conducted on the Hellsgate Winter Range Mitigation Project area, a 4,943 acre ranch purchased for mitigating some habitat losses associated with the original construction of Grand Coulee Dam and innundation of habitat by Lake Roosevelt. A Habitat Evaluation Procedure (HEP) study was used to determine habitat quality and quantity baseline data and future projections. Target species used in the study were sharp-tailed grouse (Tympanuchus phasianellus), mule deer (Odocoileus hemoinus), mink (Mustela vison), spotted sandpiper (Actiius colchicus), bobcat (Felis reufs), blue grouse (Dendragapus obscurus), and mourning dove (Zenaida macroura). From field data collected, limiting life values or HSI's (Habitat Suitability Index's) for each indicator species was determined for existing habitats on project lands. From this data a long term management plan was developed. This report is designed to provide guidance for the management of project lands in relation to the habitat cover types discussed and the indicator species used to evaluate these cover types. In addition, the plan discusses management actions, habitat enhancements, and tools that will be used to enhance, protect and restore habitats to desired conditions. Through planned management actions biodiversity and vegetative structure can be optimized over time to reduce or eliminate, limiting HSI values for selected wildlife on project lands.

  7. Marketing plan of l'Avellà

    OpenAIRE

    Kalashnikova, Ekaterina

    2017-01-01

    Treball Final de Grau. Grau en Administració d'Empreses. Codi: AE1049. Curs acadèmic 2016/2017 This work is part of the Tourism Excellence Plan for the Inter-Municipal Association of Catí, Culla, Benassal and Ares del Maestrat launched by the Valencian Tourism Agency and the Diputación de Castellón in 2017, the objective of which is to improve the competitiveness of these tourist destinations of the interior Castellon. With the development of this Plan it is intended to enhance...

  8. 75 FR 61174 - Warner Valley Comprehensive Site Plan, Final Environmental Impact Statement, Lassen Volcanic...

    Science.gov (United States)

    2010-10-04

    ... Warner Valley fen and wetland areas; (3) Removal or repair of Dream Lake Dam and restoration of associated riparian/wetland complex; (4) Protect and enhance the Drakesbad Historic District through removal... project planning area. This area includes Dream Lake Dam, built in 1932 by Alex Sifford, which impounds an...

  9. Environmental regulations handbook for enhanced oil recovery. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, T.D.

    1980-08-01

    A guide to environmental laws and regulations which have special significance for enhanced oil recovery (EOR) is presented. The Clean Air Act, the Clean Water Act, the Safe Drinking Water Act, Resource Conservation and Recovery Act, federal regulations, and state regulations are discussed. This handbook has been designed as a planning tool and a convenient reference source. The 16 states included comprise the major oil-producing states in various regions of the state. The major topics covered are: general guidelines for complying with environmental laws and regulations; air pollution control; water pollution control; protecting drinking water: underground injection control; hazardous waste management; and federal laws affecting siting or operation of EOR facilities. (DMC)

  10. Project Execution Plan,Rev. 3; FINAL

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  11. Geothermal Permeability Enhancement - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Joe Beall; Mark Walters

    2009-06-30

    The overall objective is to apply known permeability enhancement techniques to reduce the number of wells needed and demonstrate the applicability of the techniques to other undeveloped or under-developed fields. The Enhanced Geothermal System (EGS) concept presented in this project enhances energy extraction from reduced permeability zones in the super-heated, vapor-dominated Aidlin Field of the The Geysers geothermal reservoir. Numerous geothermal reservoirs worldwide, over a wide temperature range, contain zones of low permeability which limit the development potential and the efficient recovery of heat from these reservoirs. Low permeability results from poorly connected fractures or the lack of fractures. The Enhanced Geothermal System concept presented here expands these technologies by applying and evaluating them in a systematic, integrated program.

  12. The 2016-2018 National Plan of Management of Radioactive Materials and Wastes. Final report

    International Nuclear Information System (INIS)

    2017-01-01

    A first document contains the final version of the French National Plan of Management of Radioactive Materials and Wastes (PNGMDR) for the period 2016-2018: principles and objectives (presentation of radioactive materials and wastes, principles to be taken into account to define pathways of management of radioactive wastes, legal and institutional framework, information transparency), the management of radioactive materials (context and challenges, management pathways, works on fast breeder reactors of fourth generation), assessment and perspectives of existing pathways of management of radioactive wastes (management of historical situations, management of residues of mining and sterile processing, management of waste with a high natural radioactivity, management of very short life waste, of very low activity wastes, and low and medium activity wastes), needs and perspectives regarding management processes to be implemented for the different types of radioactive wastes. Appendices to this document contain: a recall of the content of previous PNGMDR since 2007, a synthesis of realisations and researches performed abroad, research orientations for the concerned period, and international agreement on spent fuel and radioactive waste management. A second document, released by the ASN, proposes an environmental and strategic assessment of the plan. A third one and a fourth one contain the opinion of the Environmental Authority on the plan preliminary focus and the answer to the Environmental Authority by the ASN. Finally, a synthesis of the remarks made by the public about the PNGMDR and the answers to these remarks conclude the document

  13. SKB`s planning of the EIA in connection with the final disposal of nuclear waste

    Energy Technology Data Exchange (ETDEWEB)

    Thegerstroem, C.; Forsstroem, H. [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden)

    1995-12-01

    The plans for the final disposal of Swedish nuclear waste are summarized. The legal requirements on Environmental Impact Statements (EIS) and their role in the program for the final disposal of nuclear waste are described. SKB`s view of the purpose of the Environmental Impact Assessment is described in the light of the experience which now exists from the work on an encapsulation facility and a deep repository. In order to obtain an adequate basis for decision-making, the EIS is of central importance. In SKB`s view, with regard to the final disposal of nuclear waste in Sweden, there is a very good possibility of fulfilling the requirements on the EIS which should be made within modern environmental protection work. 8 refs, 5 figs.

  14. SU-E-T-56: Brain Metastasis Treatment Plans for Contrast-Enhanced Synchrotron Radiation Therapy

    Energy Technology Data Exchange (ETDEWEB)

    Obeid, L; Adam, J [Grenoble Institut des Neurosciences, La Tronche, Rhone-Alpes (France); Tessier, A [Centre Hospitalier Universitaire, La Tronche, Rhone-Alpes (France); Vautrin, M; Benkebil, M [DOSIsoft, Cachan, Ile de France (France); Sihanath, R [Centre Hospitalier Universitaire, La Tronche, Rhone- Alpes (France)

    2014-06-01

    Purpose: Iodine-enhanced radiotherapy is an innovative treatment combining the selective accumulation of an iodinated contrast agent in brain tumors with irradiations using monochromatic medium energy x-rays. The aim of this study is to compare dynamic stereotactic arc-therapy and iodineenhanced SSRT. Methods: Five patients bearing brain metastasis received a standard helical 3D-scan without iodine. A second scan was acquired 13 min after an 80 g iodine infusion. Two SSRT treatment plans (with/without iodine) were performed for each patient using a dedicated Monte Carlo (MC) treatment planning system (TPS) based on the ISOgray TPS. Ten coplanar beams (6×6 cm2, shaped with collimator) were simulated. MC statistical error objective was less than 5% in the 50% isodose. The dynamic arc-therapy plan was achieved on the Iplan Brainlab TPS. The treatment plan validation criteria were fixed such that 100% of the prescribed dose is delivered at the beam isocentre and the 70% isodose contains the whole target volume. The comparison elements were the 70% isodose volume, the average and maximum doses delivered to organs at risk (OAR): brainstem, optical nerves, chiasma, eyes, skull bone and healthy brain parenchyma. Results: The stereotactic dynamic arc-therapy remains the best technique in terms of dose conformation. Iodine-enhanced SSRT presents similar performances to dynamic arc-therapy with increased brainstem and brain parenchyma sparing. One disadvantage of SSRT is the high dose to the skull bone. Iodine accumulation in metastasis may increase the dose by 20–30%, allowing a normal tissue sparing effect at constant prescribed dose. Treatment without any iodine enhancement (medium-energy stereotactic radiotherapy) is not relevant with degraded HDVs (brain, parenchyma and skull bone) comparing to stereotactic dynamic arc-therapy. Conclusion: Iodine-enhanced SSRT exhibits a good potential for brain metastasis treatment regarding the dose distribution and OAR criteria.

  15. Now Enhancing Working Skills: The ``NEWS`` Program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Kuiper, A. [Merex Corp. (United States)

    1995-01-23

    In October of 1992, Los Alamos National Laboratory and Merex Corporation began a pilot basic skills program to enhance workers` skills. The program, known as the NEWS (Now Enhancing Working Skills) Program, was implemented by the Training and Development Group of the Human Resources Division. A group of 106 employees known as Radiological Control Technicians (RCTs) from ESH-1 (Environmental, Safety, and Health) were targeted to take mandated DOE (Department of Energy) training. The main goal of the LANL/Merex partnership was to help RCTs prepare for mandated DOE Rad Con training and job performance by improving their information processing and math skills. A second goal of this project was to use the information from this small group to make some predictions about the Laboratory as a whole. This final report contains the description and an appendix for the ``NEWS`` program. The topics in this report include Merex class descriptions, test score results for the MAT, the WAT, the TABE, and Challenge test, a follow-up survey to Merex IPS and math training, student feedback statistics for skills programs, and lessons learned from the program.

  16. 75 FR 22737 - Final Damage Assessment and Restoration Plan for the Bayou Verdine and Calcasieu River

    Science.gov (United States)

    2010-04-30

    ..., and Liability Act (CERCLA), 42 U.S.C. 9607(f), Section 311 of the Federal Water Pollution and Control... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Final Damage Assessment and Restoration Plan for the Bayou Verdine and Calcasieu River AGENCY: National Oceanic and Atmospheric...

  17. Enhanced Simulated Annealing for Solving Aggregate Production Planning

    Directory of Open Access Journals (Sweden)

    Mohd Rizam Abu Bakar

    2016-01-01

    Full Text Available Simulated annealing (SA has been an effective means that can address difficulties related to optimisation problems. SA is now a common discipline for research with several productive applications such as production planning. Due to the fact that aggregate production planning (APP is one of the most considerable problems in production planning, in this paper, we present multiobjective linear programming model for APP and optimised by SA. During the course of optimising for the APP problem, it uncovered that the capability of SA was inadequate and its performance was substandard, particularly for a sizable controlled APP problem with many decision variables and plenty of constraints. Since this algorithm works sequentially then the current state will generate only one in next state that will make the search slower and the drawback is that the search may fall in local minimum which represents the best solution in only part of the solution space. In order to enhance its performance and alleviate the deficiencies in the problem solving, a modified SA (MSA is proposed. We attempt to augment the search space by starting with N+1 solutions, instead of one solution. To analyse and investigate the operations of the MSA with the standard SA and harmony search (HS, the real performance of an industrial company and simulation are made for evaluation. The results show that, compared to SA and HS, MSA offers better quality solutions with regard to convergence and accuracy.

  18. Minimum Value of Eligible Employer-Sponsored Plans and Other Rules Regarding the Health Insurance Premium Tax Credit. Final regulations.

    Science.gov (United States)

    2015-12-18

    This document contains final regulations on the health insurance premium tax credit enacted by the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010, as amended by the Medicare and Medicaid Extenders Act of 2010, the Comprehensive 1099 Taxpayer Protection and Repayment of Exchange Subsidy Overpayments Act of 2011, and the Department of Defense and Full-Year Continuing Appropriations Act, 2011. These final regulations affect individuals who enroll in qualified health plans through Affordable Insurance Exchanges (Exchanges, sometimes called Marketplaces) and claim the health insurance premium tax credit, and Exchanges that make qualified health plans available to individuals and employers.

  19. California Air Quality State Implementation Plans; Final Approval; Butte County Air Quality Management District; Stationary Source Permits

    Science.gov (United States)

    EPA is taking final action to approve a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP). This revision concerns the District's New Source Review (NSR) permitting program.

  20. Feasibility of using intravenous contrast-enhanced computed tomography (CT) scans in lung cancer treatment planning

    International Nuclear Information System (INIS)

    Xiao Jianghong; Zhang Hong; Gong Youling; Fu Yuchuan; Tang Bin; Wang Shichao; Jiang Qingfeng; Li Ping

    2010-01-01

    Background and purpose: To investigate the feasibility of using intravenous contrast-enhanced computed tomography (CT) scans in 3-dimensional conformal radiotherapy (3D-CRT), stereotactic body radiation therapy (SBRT) and intensity-modulated radiotherapy (IMRT) treatment planning for lung cancers, respectively. Materials and methods: Twelve patients with bulky lung tumors and 14 patients with small lung tumors were retrospectively analyzed. Each patient took two sets of CT in the same position with active breathing control (ABC) technique before and after intravenous contrast agent (CA) injections. Bulky tumors were planned with 3D-CRT, while SBRT plans were generated for patients with small tumors based on CT scans with intravenous CA. In addition, IMRT plans were generated for patients with bulky tumors to continue on a planning study. All plans were copied and replaced on the scans without intravenous CA. The radiation doses calculated from the two sets of CTs were compared with regard to planning volumes (PTV), the organ at-risk (OAR) and the lungs using Wilcoxon's signed rank test. Results: In comparisons for 3D-CRT plans, CT scans with intravenous CA reduced the mean dose and the maximum dose of PTV with significant differences (p 95 ) for targets, respectively (p < 0.05). There was no statistical significance for lung parameters between two sets of scans in SBRT plans and IMRT plans. Conclusions: The enhanced CT scans can be used for both target delineation and treatment planning in 3D-CRT. The dose difference caused by intravenous CA is small. But for SBRT and IMRT, the minimum irradiation dose in targets may be estimated to be increased up to 2.71% while the maximum dose may be estimated to be decreased up to 1.36%. However, the difference in dose distribution in most cases were found to be clinical tolerable.

  1. 76 FR 29259 - Swan Lake National Wildlife Refuge, Chariton County, MO; Final Comprehensive Conservation Plan...

    Science.gov (United States)

    2011-05-20

    ...We, the U.S. Fish and Wildlife Service (Service), announce the availability of the Final Comprehensive Conservation Plan (CCP) and Finding of No Significant Impact (FONSI) for the Environmental Assessment (EA) for Swan Lake National Wildlife Refuge (NWR). Goals and objectives in the CCP describe how the agency intends to manage the refuge over the next 15 years.

  2. THE SIGNIFICANCE OF MANAGEMENT INFORMATION SYSTEMS FOR ENHANCING STRATEGIC AND TACTICAL PLANNING

    Directory of Open Access Journals (Sweden)

    Akram Jalal Karim

    2011-08-01

    Full Text Available Management Information Systems (MIS is the key factor to facilitate and attain efficient decision making in an organization. This research explores the extent to which management information systems implemented to make successful decisions at two selected financial organizations. The research examined whether the selected financial institutions of Bahrain vary as to the use of Management Information Systems leadership of decision making for strategic and tactical planning purposes. The research adapted the quantitative research design to examine two research hypotheses. A total of 190 forms were equally distributed to those who are working at different management levels at the selected organizations. The results of the research showed that MIS was primarily used to enhance strategic planning in both financial institutions. The regression analysis revealed that Tactical planning is found to have no effect on Decision Making, while Strategic planning has a clear effect on the Decision Making Effectiveness in both organizations

  3. Development of community plans to enhance survivorship from colorectal cancer: community-based participatory research in rural communities.

    Science.gov (United States)

    Lengerich, Eugene J; Kluhsman, Brenda C; Bencivenga, Marcyann; Allen, Regina; Miele, Mary Beth; Farace, Elana

    2007-09-01

    In 2002, 10.4% of the 10 million persons alive who have ever been diagnosed with cancer had colorectal cancer (CRC). Barriers, such as distance, terrain, access to care and cultural differences, to CRC survivorship may be especially relevant in rural communities. We tested the hypothesis that teams from rural cancer coalitions and hospitals would develop a Community Plan (CP) to enhance CRC survivorship. We used community-based participatory research and the PRECEDE-PROCEED model to train teams from rural cancer coalitions and hospitals in Pennsylvania and New York. We measured knowledge at three points in time and tested the change with McNemar's test, corrected for multiple comparisons (p < 0.0167). We also conducted a qualitative review of the CP contents. Fourteen (93.3%) of the 15 coalitions or hospitals initially recruited to the study completed a CP. Knowledge in public health, sponsorship of A National Action Plan for Cancer Survivorship, and CRC survivorship and treatment increased. Teams identified perceived barriers and community assets. All teams planned to increase awareness of community assets and almost all planned to enhance treatment-related care and psychosocial care for the CRC survivor; 50% planned to enhance primary care and CRC screening. The study demonstrated the interest and ability of rural organizations to plan to enhance CRC survivorship, including linkage of CRC survivorship to primary care. Rural cancer coalitions and hospitals may be a vehicle to develop local action for A National Action Plan. Access to more comprehensive care for CRC cancer survivors in rural communities appears to be facilitated by the community-based initiative described and investigated in this study. Efforts such as these could be replicated in other rural communities and may impact the care and quality of life of survivors with many types of cancers. While access to health services may be increased through community-based initiatives, we still need to measure

  4. MnDOT Library strategic plan : final report.

    Science.gov (United States)

    2017-06-01

    MnDOTs Senior Leadership asked MnDOT Library to develop a Strategic Plan that identifies and reviews the challenges facing the Library over the next five years to better address the evolving needs of the department and users. The strategic plan is...

  5. 34 CFR 611.2 - What management plan must be included in a Teacher Quality Enhancement Grants Program application?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What management plan must be included in a Teacher... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... appropriate, a management plan that includes a proposed multiyear workplan. (b) At a minimum, this workplan...

  6. South Dakota ITS/CVO business plan : final business plan

    Science.gov (United States)

    1998-01-18

    This report defines an Intelligent Transportation Systems/Commercial Vehicle Operations (ITS/CVO) program for the State of South Dakota. Structured as a business plan, the document includes the following components: 1) description of the current CVO ...

  7. Master plan study - District heating Kohtla-Jaerve and Johvi municipalities. Estonia. Final report. Appendices for chapter 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to chapter nine of the final report of the master plan study on district heating in the municipalities of Kohtla-Jarve and Johvi municipalities (Estonia) present extensive data relating to economic, financial and environmental calculations, fuel consumption, energy balance and prices. (ARW)

  8. A neo-strategic planning approach to enhance local tobacco control programs.

    Science.gov (United States)

    Douglas, Malinda R; Carter, Sara Sally R; Wilson, Andrew P; Chan, Andie

    2015-01-01

    Research in tobacco control demonstrating best practices is widely disseminated; however, application at the local level is often difficult. Translating research into practice requires a concerted effort to develop an understanding of the evidence and how it can be applied within diverse contexts. A strategic planning infrastructure was developed to support the translation of evidence-based interventions into community practice. This paper highlights the strategic process of turning "know-what" into "know-how" to facilitate the strategic planning and implementation of tobacco control best practices at the local level. The purpose, people, process, and product strategies of knowledge management and translation provided a framework for the strategic planning infrastructure. The knowledge translation concepts of audience, motivations, and mechanisms were synergized in the neo-strategic planning component design. The participants were 20 community coalitions funded to implement local tobacco control programs. From 2004 to 2011, the strategic planners facilitated a cyclical process to translate research into practice using a trio of integrated tools, skill-building workshops on strategic planning, and grantee-driven technical assistance and consultation. In the short term, the usefulness of the strategic planning components to the programs was measured. The intermediate outcome was the successful movement of the community programs from the planning stage to the implementation stage. The achievement of community-level changes in planned tobacco control efforts was the overall outcome measure for the success of the local coalitions. Seventeen of 20 communities that began the planning process implemented strategic plans. All 17 of the programs implemented evidence-based practices, resulting in numerous tobacco-free policies, increased cessation, and increased support from the media and community. Bridging the gap between research and practice can enhance the practicality

  9. Tracking the Short Term Planning (STP) Development Process

    Science.gov (United States)

    Price, Melanie; Moore, Alexander

    2010-01-01

    Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."

  10. Integrating socio-economic and biophysical data to enhance watershed management and planning

    Science.gov (United States)

    Pirani, Farshad Jalili; Mousavi, Seyed Alireza

    2016-09-01

    Sustainability has always been considered as one of the main aspects of watershed management plans. In many developing countries, watershed management practices and planning are usually performed by integrating biophysical layers, and other existing layers which cannot be identified as geographic layers are ignored. We introduce an approach to consider some socioeconomic parameters which are important for watershed management decisions. Ganj basin in Chaharmahal-Bakhtiari Province was selected as the case study area, which includes three traditional sanctums: Ganj, Shiremard and Gerdabe Olya. Socioeconomic data including net agricultural income, net ranching income, population and household number, literacy rate, unemployment rate, population growth rate and active population were mapped within traditional sanctums and then were integrated into other biophysical layers. After overlaying and processing these data to determine management units, different quantitative and qualitative approaches were adopted to achieve a practical framework for watershed management planning and relevant plans for homogeneous units were afterwards proposed. Comparing the results with current plans, the area of allocated lands to different proposed operations considering both qualitative and quantitative approaches were the same in many cases and there was a meaningful difference with current plans; e.g., 3820 ha of lands are currently managed under an enclosure plan, while qualitative and quantitative approaches in this study suggest 1388 and 1428 ha to be allocated to this operation type, respectively. Findings show that despite the ambiguities and complexities, different techniques could be adopted to incorporate socioeconomic conditions in watershed management plans. This introductory approach will help to enhance watershed management decisions with more attention to societal background and economic conditions, which will presumably motivate local communities to participate in

  11. 75 FR 70114 - Amendment to the Interim Final Rules for Group Health Plans and Health Insurance Coverage...

    Science.gov (United States)

    2010-11-17

    ... HEALTH AND HUMAN SERVICES Office of Consumer Information and Insurance Oversight 45 CFR Part 147 RIN 0950-AA17 [OCIIO-9991-IFC2] Amendment to the Interim Final Rules for Group Health Plans and Health Insurance... Administration, Department of Labor; Office of Consumer Information and Insurance Oversight, Department of Health...

  12. 77 FR 76067 - Notice of Availability of a Proposed Land Use Plan Amendment and Final Environmental Impact...

    Science.gov (United States)

    2012-12-26

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-051552, LLCAD0700 L51010000 FX0000 LVRWB10B3980] Notice of Availability of a Proposed Land Use Plan Amendment and Final Environmental Impact Statement for the Proposed McCoy Solar Energy Project, CA AGENCY: Bureau of Land Management, Interior...

  13. Designing an energy planning concept for enhancing the dissemination of renewable energy technologies in developing countries

    DEFF Research Database (Denmark)

    Lybæk, Rikke; Andersen, Jan; Lund, Søren

    2014-01-01

    This paper stresses the need for adapting a sustainable energy planning concept, which can support the implementation of renewable energy in developing countries; exemplified by a Vietnamese case. Many developing countries heavily rely on fossil fuel resources and will face energy supply security...... countries, while relevant policies, tools and plans etc. simultaneously are being deployed, enhancing the framework conditions for renewable energy implementation...

  14. 78 FR 76176 - Notice of Availability of the Record of Decision for the Final Trail Management Plan...

    Science.gov (United States)

    2013-12-16

    ... paddling; and improved parking facilities. Alternative 2A emphasized the importance of enhancing the... 1, the no-action alternative, the trails, authorized uses, and facilities addressed in this Plan/EIS... system, adoption of the Sustainable Trail Guidelines, and the consideration of trail facilities. Trail...

  15. Prioritization of tasks in the draft LWR safety technology program plan. Final report

    International Nuclear Information System (INIS)

    Lim, E.Y.; Miller, W.J.; Parkinson, W.J.; Ritzman, R.L.; vonHerrmann, J.L.; Wood, P.J.

    1980-05-01

    The purpose of this report is to describe both the approach taken and the results produced in the SAI effort to prioritize the tasks in the Sandia draft LWR Safety Technology Program Plan. This work used the description of important safety issues developed in the Reactor Safety Study (2) to quantify the effect of safety improvements resulting from a research and development program on the risk from nuclear power plants. Costs of implementation of these safety improvements were also estimated to allow a presentation of the final results in a value (i.e., risk reduction) vs. impact (i.e., implementation costs) matrix

  16. Spatial planning via extremal optimization enhanced by cell-based local search

    International Nuclear Information System (INIS)

    Sidiropoulos, Epaminondas

    2014-01-01

    A new treatment is presented for land use planning problems by means of extremal optimization in conjunction to cell-based neighborhood local search. Extremal optimization, inspired by self-organized critical models of evolution has been applied mainly to the solution of classical combinatorial optimization problems. Cell-based local search has been employed by the author elsewhere in problems of spatial resource allocation in combination with genetic algorithms and simulated annealing. In this paper it complements extremal optimization in order to enhance its capacity for a spatial optimization problem. The hybrid method thus formed is compared to methods of the literature on a specific characteristic problem. It yields better results both in terms of objective function values and in terms of compactness. The latter is an important quantity for spatial planning. The present treatment yields significant compactness values as emergent results

  17. Acoustic Resonance Spectroscopy (ARS) Munition Classification System enhancements. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Vela, O.A.; Huggard, J.C.

    1997-09-18

    Acoustic Resonance Spectroscopy (ARS) is a non-destructive evaluation technology developed at the Los Alamos National Laboratory (LANL). This technology has resulted in three generations of instrumentation, funded by the Defense Special Weapons Agency (DSWA), specifically designed for field identification of chemical weapon (CW) munitions. Each generation of ARS instrumentation was developed with a specific user in mind. The ARS1OO was built for use by the U.N. Inspection Teams going into Iraq immediately after the Persian Gulf War. The ARS200 was built for use in the US-Russia Bilateral Chemical Weapons Treaty (the primary users for this system are the US Onsite Inspection Agency (OSIA) and their Russian counterparts). The ARS300 was built with the requirements of the Organization for the Prohibition of Chemical Weapons (OPCW) in mind. Each successive system is an improved version of the previous system based on learning the weaknesses of each and, coincidentally, on the fact that more time was available to do a requirements analysis and the necessary engineering development. The ARS300 is at a level of development that warrants transferring the technology to a commercial vendor. Since LANL will supply the computer software to the selected vendor, it is possible for LANL to continue to improve the decision algorithms, add features where necessary, and adjust the user interface before the final transfer occurs. This paper describes the current system, ARS system enhancements, and software enhancements. Appendices contain the Operations Manual (software Version 3.01), and two earlier reports on enhancements.

  18. 77 FR 24483 - Wausau Paper Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To...

    Science.gov (United States)

    2012-04-24

    ... Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To Intervene, and...: Wausau Paper Mills, LLC. e. Name of Project: Rhinelander Hydroelectric Project. f. Location: The upper.... Applicant Contact: Mr. Tim Hasbargen, Wausau Paper Mills, LLC, 515 Davenport St., Rhinelander, Wisconsin...

  19. 2013 Nutrition Risk Research Plan Review Final Report. Research Plan Review for: The Risk Factor of Inadequate Nutrition

    Science.gov (United States)

    2014-01-01

    The 2013 Nutrition Risk Standing Review Panel (from here on referred to as the SRP) was impressed by the degree of progress the nutrition discipline has made with the research plan presented since the 2012 Nutrition Risk SRP WebEx/teleconference. The scientists and staff associated with the nutrition discipline have, in addition, continued their impressive publication track record. Specifically the SRP found that the novel and important progress in the ocular health research area (Gap N7.3) represents an important advance in understanding the etiology and potential countermeasures for this condition and thinks that the work will not only be valuable for vision, but may have implications for cardiovascular health, as well. The SRP also considered the bone countermeasure data presented a potentially valuable tool for investigating bone metabolism under the unique conditions of space travel, specifically the innovation of variable use of stable Ca isotopes for bone synthesis and equal contribution for bone to investigate bone metabolism, as well as, the impact of the advanced resistive exercise device (ARED) on body composition during spaceflight. Finally, the SRP considers the planned Integrated Nutrition task to be an important and necessary strategic part of the research plan. The SRP is concerned that the risks observed in previous research on Low Earth Orbit (LEO) may not capture all the risks of longer duration flight beyond LEO. In particular, the SRP believes that there may be a much greater likelihood of an intensified chronic inflammatory response compared to the very minimal evidence seen to date and that modest effects seen in LEO, such as the reduction in appetite, may not predict an absence in longer duration flight out of LEO. The added complications of longer duration flight, greater bio-behavioral stress, radiation exposure, poorer communication, and inability to respond to unforeseen exigencies may create different risks. Thus, preparation for

  20. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    International Nuclear Information System (INIS)

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff's review of Atlas Corporation's proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs

  1. Change in contrast enhancement of HCC on 1-month follow-up CT after local radiotherapy: An early predictor of final treatment response

    International Nuclear Information System (INIS)

    Kim, Eun Young; Choi, Dongil; Lim, Do Hoon; Lee, Won Jae; Yoo, Byung Chul; Paik, Seung Woon

    2009-01-01

    Background: The purpose of this study was to evaluate the change in contrast enhancement of HCC on 1-month follow-up CT after local radiotherapy (RT) as an early predictor of final treatment response. Materials: Fifty patients who underwent local RT for HCCs had both pre-RT and post-RT CT scans including 1-month follow-up CT. We assessed the final treatment response by using the change in maximal tumor size on 6-12-month follow-up CT scan after RT. We also evaluated the change in tumor enhancement between pre-RT and 1-month follow-up CT scans. Results: A final treatment response was achieved in 27 (54%) of 50 patients, who showed either a complete response (n = 11) or a partial response (n = 16). Compared with non-responsive patients (n = 23), responsive patients showed a significant decrease in tumor enhancement on 1-month follow-up CT after RT in both objective and subjective analyses (each P < 0.001). Conclusion: The change in contrast enhancement of HCC seen on the 1-month follow-up CT in patients after local RT may be used as an early predictor of final treatment response.

  2. Medicare and Medicaid programs; advance directives--HCFA. Final rule.

    Science.gov (United States)

    1995-06-27

    This final rule responds to public comments on the March 6, 1992 interim final rule with comment period that amended the Medicare and Medicaid regulations governing provider agreements and contracts to establish requirements for States, hospitals, nursing facilities, skilled nursing facilities, providers of home health care or personal care services, hospice programs and managed care plans concerning advance directives. An advance directive is a written instruction, such as a living will or durable power of attorney for health care, recognized under State law, relating to the provision of health care when an individual's condition makes him or her unable to express his or her wishes. The intent of the advance directives provisions is to enhance an adult individual's control over medical treatment decisions. This rule confirms the interim final rule with several minor changes based on our review and consideration of public comments.

  3. Final Report - Development of a Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Maracas, Kate; Hooks, Todd

    2006-11-30

    The Agua Caliente Band of Cahuilla Indians was awarded a grant under the U.S. Department of Energy’s (“DOE”) Tribal Energy Program to develop a comprehensive Tribal energy plan. The grant, awarded under DOE’s First Steps program, supported the development of a strategic energy plan that integrates with the Tribe’s overall planning and economic development goals, and aligns with Tribal cultural, social, political, and spiritual values. The Tribe set out to incorporate its energy plan into (i) a broader economic development strategy developed by investigators at the University of California at Riverside, and (ii) the overarching goals for job-creation and wealth-creation that are held by both the Tribe and the surrounding Coachella Valley. With these wide-ranging objectives in mind, the Tribe and its consultant, Red Mountain Energy Partners, engaged in a phased approach to creating the strategic energy plan. As illustrated in Figure 1 below, the proposed approach involved both “serial” and “parallel” activities. The capacity-building component of this approach occurred throughout the duration of the project period.

  4. Final Work Plan: Targeted Investigation at York, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan, the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.

  5. Recovery and enhancement plan development for the Leading Creek watershed, Meigs County, Ohio

    International Nuclear Information System (INIS)

    Currie, R.J.; Cherry, D.S.; Latimer, H.A.; Babendreier, J.E.; Van Hassel, J.H.

    1998-01-01

    Following the flooding of the Meigs No. 31 coal mine in Meigs County, Ohio, a proactive plan was developed to evaluate initial dewatering effects, recovery and development of a watershed enhancement plan. Approximately half of the 31-mile Leading Creek mainstem received ∼one billion gallons of coal mine discharge, including sludge and slurry. Damage to the stream system resulted from high conductivity (∼6,000 micromhos/cm), low pH (2.5--3.5), high metals (aluminum, cadmium, copper, iron and iron floc, lead, manganese, nickel and zinc) and total suspended solids. Most forms of aquatic life were depleted in the impacted areas. Four years after the incident, many forms of benthic macroinvertebrates and fish have recovered in the creek, with sediments purged of metals by stormwater events. The enhancement plan involves a reconnaissance of the creek and tributaries pinpointing areas of agricultural sedimentation and abandoned minedland discharges (AMD). Seventeen tributary and ten mainstem stations were addressed as point source discharges with water/sediment toxicity and in-situ testing of Asian clams. One-third of the stations were intermittently toxic from rainfall runoff and the degree of AMD input. Benthic macroinvertebrates in many tributaries were stressed and comprised 1--5 taxa. Erosion/sedimentation was addressed by the USEPA 1-Dimensional Hydrologic Simulation Program Fortran (HSPF) model, as well as incorporating land use management/habitat assessment, and data management by Geographical Information Systems

  6. Final disposal of spent nuclear fuel in Sweden. Some unresolved issues and challenges in the design and implementation of the forthcoming planning and EIA processes

    International Nuclear Information System (INIS)

    Bjarnadottir, H.; Hilding-Rydevik, T.

    2001-06-01

    The aim of the study is to highlight some unresolved and challenging issues in the forthcoming approximately six year long Environmental Impact Assessment (EIA) and planning process of the long-term disposal of spent nuclear fuel in Sweden. Different international and Nordic experiences of the processes for final disposal as well as from other development of similar scope, where experiences assumed to be of importance for final disposal of nuclear waste, have been described. Furthermore, issues relating to 'good EIA practice' as well as certain aspects of planning theory have also been presented. The current Swedish situation for the planning and EIA process of the final disposal of spent nuclear fuel was also been summarized. These different 'knowledge areas' have been compared and measured against our perception of the expectations towards the forthcoming process, put forward by different Swedish actors in the field. The result is a presentation of a number of questions and identification issues that the authors consider need special attention in the design and conduction of the planning and EIA process. The study has been realized through a literature survey and followed by reading and analysis of the written material. The main focus of the literature search was on material describing planning processes, actor perspectives and EIA. Material and literature on the technical and scientific aspects of spent nuclear fuel disposal was however deliberately avoided. There is a wealth of international and Swedish literature concerning final disposal of spent nuclear fuel - concerning both technical issues and issues concerning for example public participation and risk perception. But material of a more systematic and comparative nature (relating to both empirical and theoretical issues, and to practical experiences) in relation to EIA processes and communicative planning for final disposal of spent nuclear fuel seems to be more sparsely represented. Our perception of

  7. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff`s review of Atlas Corporation`s proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs.

  8. Intelligent transportation systems business plan for Kentucky : final report.

    Science.gov (United States)

    2001-09-01

    This report presents a Business Plan for Intelligent Transportation Systems (ITS) in Kentucky. The purpose of the Business Plan is to define ITS projects that are planned for implementation from 2002 through 2007. The list of projects contained withi...

  9. Claims Procedure for Plans Providing Disability Benefits; 90-Day Delay of Applicability Date. Final rule; delay of applicability

    Science.gov (United States)

    2017-11-29

    This document delays for ninety (90) days--through April 1, 2018--the applicability of a final rule amending the claims procedure requirements applicable to ERISA-covered employee benefit plans that provide disability benefits (Final Rule). The Final Rule was published in the Federal Register on December 19, 2016, became effective on January 18, 2017, and was scheduled to become applicable on January 1, 2018. The delay announced in this document is necessary to enable the Department of Labor to carefully consider comments and data as part of its effort, pursuant to Executive Order 13777, to examine regulatory alternatives that meet its objectives of ensuring the full and fair review of disability benefit claims while not imposing unnecessary costs and adverse consequences.

  10. Formal and Informal Planning Instruments as Catalyst for Urban Attractiveness. Enhancing Town Attractiveness in the Land of Beiuş, Romania

    Directory of Open Access Journals (Sweden)

    PAUL EMIL OLĂU

    2014-06-01

    Full Text Available We are once again witnessing a directional change in urban studies. This simple and concise statement comes out from a brief analysis of both the latest interests of different scholars and the discourses of urban, regional, and governmental actors. The change we are talking about refers to a slight interest drop in environmental issues and an ever-increasing attention paid to the economic and social aspects of urban life. The conceptual shift from sustainable development to smart growth is a good example, and the fact that the recent European Union papers (EU 2020 strategy, EU Cohesion Policy 2014-2020 have adopted it ensures its liability. Coming to urban planning, which is primarily conceived as sets of regulatory measures, one can notice that in order to achieve the latest standards it has to develop and implement new methods and instruments which will eventually lead to smart, sustainable and inclusive growth. Knowing that urban plans look to specific urban issues as zoning, layout and design, which are usually regulated by legally approved national guidelines, this new tasks fall into the charge of informal planning. In Romania, informal planning refers to local development strategies, local action plans as well as the Local Agenda 21, which was implemented throughout the world. Admitting that municipalities worldwide are in a sharp competition for inhabitants, investors and capital (from trade, tourism, exhibitions, etc., we realize that small and medium-sized towns have to ensure that all of their valuable characteristics are as visible and as marketable as possible. In order to do this, they have to enhance their attractiveness through different actions, using different methods and instruments. The present paper highlights the ways that local actors in four small cities in Bihor County, Romania are trying to market their municipalities. The chosen cities organically fit into one of the most representative mental space in Romania, the

  11. A mass merchandiser's role in enhancing pharmacy students' business plan development skills for medication therapy management services.

    Science.gov (United States)

    Moultry, Aisha Morris

    2011-09-10

    To develop a relationship between a pharmacy management course and a mass merchandiser and to determine whether involving pharmacy managers from the mass merchandiser in the course would enhance student skills in developing a business plan for medication therapy management services. The pharmacy managers from the mass merchandiser participated in lectures, provided panel discussions, and conducted a business plan competition. Learning was assessed by means of 4 examinations and 1 project (ie, the business plan). At the conclusion of the semester, surveys were administered to solicit student input and gain insight from pharmacy managers on the perceived value of this portion of the course. Students' average grade on the business plan assignment, which included the oral presentation, the peer assessment, and the written proposal, was 92.2%. Approximately 60% (n=53) of surveyed students agreed or strongly agreed that their management skills had improved because of the participation of pharmacy managers from the mass merchandiser. All of the managers enjoyed participating in the experience. The involvement of pharmacy managers from a mass merchandiser enhanced student learning in the classroom, and managers felt that their participation was an important contribution to the development of future pharmacists.

  12. Langley Research Center Strategic Plan for Education

    Science.gov (United States)

    Proctor, Sandra B.

    1994-01-01

    Research assignment centered on the preparation of final draft of the NASA Langley Strategic Plan for Education. Primary research activity consisted of data collection, through interviews with LaRC Office of Education and NASA Headquarters staff, university administrators and faculty, and school administrators / teachers; and documentary analysis. Pre-college and university programs were critically reviewed to assure effectiveness, support of NASA and Langley's mission and goals; National Education Goals; and educational reform strategies. In addition to these mandates, pre-college programs were reviewed to address present and future LaRC activities for teacher enhancement and preparation. University programs were reviewed with emphasis on student support and recruitment; faculty development and enhancement; and LaRC's role in promoting the utilization of educational technologies and distance learning. The LaRC Strategic Plan for Education will enable the Office of Education to provide a focused and well planned continuum of education programs for students, teachers and faculty. It will serve to direct and focus present activities and programs while simultaneously offering the flexibility to address new and emerging directions based on changing national, state, and agency trends.

  13. Discussion on teaching reform of environmental planning and management

    Science.gov (United States)

    Zhang, Qiugen; Chen, Suhua; Xie, Yu; Wei, Li'an; Ding, Yuan

    2018-05-01

    The curriculum of environmental planning and management is an environmental engineering major curriculum established by the teaching steering committee of environmental science and engineering of Education Ministry, which is the core curriculum of Chinese engineering education professional certification. It plays an important role in cultivating environmental planning and environmental management ability of environmental engineering major. The selection and optimization of the course teaching content of environmental planning and management were discussed which including curriculum teaching content updating and optimizing and teaching resource system construction. The comprehensive application of teaching method was discussed which including teaching method synthesis and teaching method. The final combination of the assessment method was also discussed which including the formative assessment normal grades and the final result of the course examination. Through the curriculum comprehensive teaching reform, students' knowledge had been broadened, the subject status and autonomy of learning had been enhanced, students' learning interest had been motivated, the ability of students' finding, analyzing and solving problems had been improved. Students' innovative ability and positive spirit had been well cultivated.

  14. Final disposal of spent nuclear fuel in Sweden. Some unresolved issues and challenges in the design and implementation of the forthcoming planning and EIA processes

    Energy Technology Data Exchange (ETDEWEB)

    Bjarnadottir, H.; Hilding-Rydevik, T. [Nordregio, Stockholm (Sweden)

    2001-06-01

    The aim of the study is to highlight some unresolved and challenging issues in the forthcoming approximately six year long Environmental Impact Assessment (EIA) and planning process of the long-term disposal of spent nuclear fuel in Sweden. Different international and Nordic experiences of the processes for final disposal as well as from other development of similar scope, where experiences assumed to be of importance for final disposal of nuclear waste, have been described. Furthermore, issues relating to 'good EIA practice' as well as certain aspects of planning theory have also been presented. The current Swedish situation for the planning and EIA process of the final disposal of spent nuclear fuel was also been summarized. These different 'knowledge areas' have been compared and measured against our perception of the expectations towards the forthcoming process, put forward by different Swedish actors in the field. The result is a presentation of a number of questions and identification issues that the authors consider need special attention in the design and conduction of the planning and EIA process. The study has been realized through a literature survey and followed by reading and analysis of the written material. The main focus of the literature search was on material describing planning processes, actor perspectives and EIA. Material and literature on the technical and scientific aspects of spent nuclear fuel disposal was however deliberately avoided. There is a wealth of international and Swedish literature concerning final disposal of spent nuclear fuel - concerning both technical issues and issues concerning for example public participation and risk perception. But material of a more systematic and comparative nature (relating to both empirical and theoretical issues, and to practical experiences) in relation to EIA processes and communicative planning for final disposal of spent nuclear fuel seems to be more sparsely represented

  15. Enhanced radiological work planning; TOPICAL

    International Nuclear Information System (INIS)

    DECKER, W.A.

    1999-01-01

    The purpose of this standard is to provide Project Hanford Management Contractors (PHMC) with guidance for ensuring radiological considerations are adequately addressed throughout the work planning process. Incorporating radiological controls in the planning process is a requirement of the Hanford Site Radiological Control Manual (HSRCM-I), Chapter 3, Part 1. This standard is applicable to all PHMC contractors and subcontractors. The essential elements of this standard will be incorporated into the appropriate site level work control standard upon implementation of the anticipated revision of the PHMC Administration and Procedure System

  16. Megavoltage conebeam CT cine as final verification of treatment plan in lung stereotactic body radiotherapy

    International Nuclear Information System (INIS)

    Kudithipudi, Vijay; Gayou, Olivier; Colonias, Athanasios

    2016-01-01

    To analyse the clinical impact of megavoltage conebeam computed tomography (MV-CBCT) cine on internal target volume (ITV) coverage in lung stereotactic body radiotherapy (SBRT). One hundred and six patients received lung SBRT. All underwent 4D computed tomography simulation followed by treatment via image guided 3D conformal or intensity modulated radiation. Prior to SBRT, all patients underwent MV-CBCT cine, in which raw projections are displayed as beam's-eye-view fluoroscopic series with the planning target volume (PTV) projected onto each image, enabling verification of tumour motion relative to the PTV and assessment of adequacy of treatment margin. Megavoltage conebeam computed tomography cine was completed 1–2 days prior to SBRT. Four patients (3.8%) had insufficient ITV coverage inferiorly at cine review. All four plans were changed by adding 5 mm on the PTV margin inferiorly. The mean change in PTV volumes was 3.9 cubic centimetres (cc) (range 1.85–6.32 cc). Repeat cine was performed after plan modification to ensure adequate PTV coverage in the modified plans. PTV margin was adequate in the majority of patients with this technique. MV-CBCT cine did show insufficient coverage in a small subset of patients. Insufficient PTV margins may be a function of 4D CT simulation inadequacies or deficiencies in visualizing the ITV inferior border in the full-inhale phase. MV-CBCT cine is a valuable tool for final verification of PTV margins.

  17. A Mass Merchandiser's Role in Enhancing Pharmacy Students’ Business Plan Development Skills for Medication Therapy Management Services

    Science.gov (United States)

    2011-01-01

    Objectives. To develop a relationship between a pharmacy management course and a mass merchandiser and to determine whether involving pharmacy managers from the mass merchandiser in the course would enhance student skills in developing a business plan for medication therapy management services. Design. The pharmacy managers from the mass merchandiser participated in lectures, provided panel discussions, and conducted a business plan competition. Learning was assessed by means of 4 examinations and 1 project (ie, the business plan). At the conclusion of the semester, surveys were administered to solicit student input and gain insight from pharmacy managers on the perceived value of this portion of the course. Assessment. Students’ average grade on the business plan assignment, which included the oral presentation, the peer assessment, and the written proposal, was 92.2%. Approximately 60% (n = 53) of surveyed students agreed or strongly agreed that their management skills had improved because of the participation of pharmacy managers from the mass merchandiser. All of the managers enjoyed participating in the experience. Conclusions. The involvement of pharmacy managers from a mass merchandiser enhanced student learning in the classroom, and managers felt that their participation was an important contribution to the development of future pharmacists. PMID:21969719

  18. The Effect of Production Planning and Budgeting on Organizational Productivity

    Directory of Open Access Journals (Sweden)

    Patrick Adebisi Olusegun ADEGBUYI

    2010-12-01

    Full Text Available Improved productivity and proper organizational structure are desired by most manufacturing outfits within the highly turbulent business environment of Nigeria. With various contributing factors, scientific basis for decision making that will lead to enhanced policies for organizational operations is stronlgy established. Five statistical hypotheses which are influence of education, government policies, planning and organizational output, and production planning/budgeting and technological advancement, propounded in this work were investigated to establish a valid decision basis on a confidence level assumed to be 0.05. The work finally examined the impact of the hypotheses on productivity.

  19. Land use planning for forest catchment of Arasbaran

    International Nuclear Information System (INIS)

    Dehdar Dargahi, M.; Makhdoum, M.F.

    2001-01-01

    In this study, land use planning for six hydrological units (296690 ha) of Arasbaran forest catchment (N W of Iran in Azerbaijan) has been conducted. The main objectives of the plan were to promote sustainable use, to increase living conditions, and enhance environmental conservation in the region. First, ecological and socio-economic resources were surveyed and mapped (scale 1:50000). Then data analysis and integration with system analysis approach were performed. As a result, 3556 micro-ecosystems were mapped. Ecological capability of mapping unit (MU) was evaluated for: agriculture, range management, forestry, eco tourism and conservation with the aid of specified ecological models. Finally with coordination of socioeconomic data and ecological capability of MU, priority of land uses with qualitative-analogous method was established. At the end, map of land use planning for six hydrological units was depicted for management purposes. The results show that %5.38 of allocated land use is suitable for irrigation farming, %1.32 for dry farming, %17.43 for range management, %15.17 for protected forestry, %2.13 for forest plantation, %28.47 for extensive eco tourism, %0.01 for intensive eco tourism and finally %30.09 for conservation

  20. Does enhancing consciousness for strategic planning processes support the effectiveness of problem-based learning concepts in biomedical education?

    Directory of Open Access Journals (Sweden)

    Arling V.

    2015-09-01

    Full Text Available Interdisciplinary skills gain increasing importance in university and professional contexts. To support these interdisciplinary skills, problem-based learning (PBL is regularly used in a course for biomedical education. In this study, we investigated whether enhancing consciousness for planning processes can support the effectiveness of PBL concepts in an intervention-control group design. Results indicated clear evidence for this: planning skills were associated with better PBL performance. Concluding, self-reflection of planning skills is useful to increase outcome performance of students in PBL courses.

  1. Beaufort Sea planning area oil and gas Lease Sale 170. Final environmental impact statement

    International Nuclear Information System (INIS)

    1998-02-01

    This environmental impact statement (EIS) assesses Lease Sale 170 proposed for August 1998 and comprised of 363 lease blocks in the Beaufort Sea planning area. The analysis addresses the significant environmental and socioeconomic concerns identified in the scoping process. Scoping consisted of input from State and Federal agencies, the petroleum industry, Native groups, environmental and public interest groups, and concerned individuals. The potential effects expected from the interaction between environmental resources and OCS-related activities were determined with respect to available scientific information and traditional knowledge. This EIS incorporates information from the Final EIS for the Beaufort Sea OCS Sale 144 (USD01, MMS, 1996a)

  2. Enhanced Geothermal System Development of the AmeriCulture Leasehold in the Animas Valley; FINAL

    International Nuclear Information System (INIS)

    Duchane, David V; Seawright, Gary L; Sewright, Damon E; Brown, Don; Witcher, James c.; Nichols, Kenneth E.

    2001-01-01

    Working under the grant with AmeriCulture, Inc., and its team of geothermal experts, assembled a plan to apply enhanced geothermal systems (EGS) techniques to increase both the temperature and flow rate of the geothermal waters on its leasehold. AmeriCulture operates a commercial aquaculture facility that will benefit from the larger quantities of thermal energy and low cost electric power that EGS technology can provide. The project brought together a team of specialists that, as a group, provided the full range of expertise required to successfully develop and implement the project

  3. Final Report for the Soboba Strategic Tribal Energy Planning Project

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Kim [EPA Specialist

    2013-09-17

    In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation. The Soboba Strategic Tribal Energy Plan's goal is to create a Five Year Energy Plan for the Soboba Band of Luiseno Indians in San Jacinto, California. This plan will guide the decision making process towards consistent progress leading to the Tribal goal of a 25% reduction in energy consumption in the next five years. It will additionally outline energy usage/patterns and will edentify areas the Tribe can decrease energy use and increase efficiency. The report documents activities undertaken under the grant, as well as incldues the Tribe's strategif energy plan.

  4. Enhancing Evacuation Plans with a Situation Awareness System Based on End-User Knowledge Provision

    Directory of Open Access Journals (Sweden)

    Augusto Morales

    2014-06-01

    Full Text Available Recent disasters have shown that having clearly defined preventive procedures and decisions is a critical component that minimizes evacuation hazards and ensures a rapid and successful evolution of evacuation plans. In this context, we present our Situation-Aware System for enhancing Evacuation Plans (SASEP system, which allows creating end-user business rules that technically support the specific events, conditions and actions related to evacuation plans. An experimental validation was carried out where 32 people faced a simulated emergency situation, 16 of them using SASEP and the other 16 using a legacy system based on static signs. From the results obtained, we compare both techniques and discuss in which situations SASEP offers a better evacuation route option, confirming that it is highly valuable when there is a threat in the evacuation route. In addition, a study about user satisfaction using both systems is presented showing in which cases the systems are assessed as satisfactory, relevant and not frustrating.

  5. Megavoltage conebeam CT cine as final verification of treatment plan in lung stereotactic body radiotherapy.

    Science.gov (United States)

    Kudithipudi, Vijay; Gayou, Olivier; Colonias, Athanasios

    2016-06-01

    To analyse the clinical impact of megavoltage conebeam computed tomography (MV-CBCT) cine on internal target volume (ITV) coverage in lung stereotactic body radiotherapy (SBRT). One hundred and six patients received lung SBRT. All underwent 4D computed tomography simulation followed by treatment via image guided 3D conformal or intensity modulated radiation. Prior to SBRT, all patients underwent MV-CBCT cine, in which raw projections are displayed as beam's-eye-view fluoroscopic series with the planning target volume (PTV) projected onto each image, enabling verification of tumour motion relative to the PTV and assessment of adequacy of treatment margin. Megavoltage conebeam computed tomography cine was completed 1-2 days prior to SBRT. Four patients (3.8%) had insufficient ITV coverage inferiorly at cine review. All four plans were changed by adding 5 mm on the PTV margin inferiorly. The mean change in PTV volumes was 3.9 cubic centimetres (cc) (range 1.85-6.32 cc). Repeat cine was performed after plan modification to ensure adequate PTV coverage in the modified plans. PTV margin was adequate in the majority of patients with this technique. MV-CBCT cine did show insufficient coverage in a small subset of patients. Insufficient PTV margins may be a function of 4D CT simulation inadequacies or deficiencies in visualizing the ITV inferior border in the full-inhale phase. MV-CBCT cine is a valuable tool for final verification of PTV margins. © 2016 The Royal Australian and New Zealand College of Radiologists.

  6. Decommissioning Planning during the Operation of the Loviisa NPP. Planning, Management and Organizational Aspects

    Energy Technology Data Exchange (ETDEWEB)

    Tuunanen, J. P.; Eurajoki, T. E.E., [Fortum Power and Heat Ltd, Nuclear Waste Espoo (Finland)

    2013-08-15

    The first decommissioning plan for Loviisa nuclear power plant was written already in 1980's, when the plant had just started operation. The plan has been updated in 5-6 years intervals and this work still continues towards the final decommissioning plan. The decommissioning plan is based on immediate dismantling option and final disposal of decommissioning waste to the extension of the on site final disposal facility for low and intermediate level waste. The decommissioning planning has been organized as an independent project, which is realised in close cooperation with Fortum's research programme on radioactive waste management. The plant personnel are involved in the planning work through providing operating experience on contamination and activation of systems, structures and components. Later in the decommissioning phase the plant personnel will form the main part of the decommissioning organization. (author)

  7. Task Analysis and Descriptions of Required Job Competencies for Robotics/Automated Systems Technicians. Final Report. Volume 2. Curriculum Planning Guide.

    Science.gov (United States)

    Hull, Daniel M.; Lovett, James E.

    This volume of the final report for the Robotics/Automated Systems Technician (RAST) curriculum project is a curriculum planning guide intended for school administrators, faculty, and student counselors/advisors. It includes step-by-step procedures to help institutions evaluate their community's needs and their capabilities to meet these needs in…

  8. Agency procedures for the NRC incident response plan. Final report

    International Nuclear Information System (INIS)

    1983-02-01

    The NRC Incident Response Plan, NUREG-0728/MC 0502 describes the functions of the NRC during an incident and the kinds of actions that comprise an NRC response. The NRC response plan will be activated in accordance with threshold criteria described in the plan for incidents occurring at nuclear reactors and fuel facilities involving materials licensees; during transportation of licensed material, and for threats against facilities or licensed material. In contrast to the general overview provided by the Plan, the purpose of these agency procedures is to delineate the manner in which each planned response function is performed; the criteria for making those response decisions which can be preplanned; and the information and other resources needed during a response. An inexperienced but qualified person should be able to perform functions assigned by the Plan and make necessary decisions, given the specified information, by becoming familiar with these procedures. This rule of thumb has been used to determine the amount of detail in which the agency procedures are described. These procedures form a foundation for the training of response personnel both in their normal working environment and during planned emergency exercises. These procedures also form a ready reference or reminder checklist for technical team members and managers during a response

  9. Final Bioventing Pilot Test Work Plan for Base Exchange Service Station Underground Storage Tank Area, Vandenberg Air Force Base, California. Part I

    National Research Council Canada - National Science Library

    1992-01-01

    This pilot test work plan presents the scope of an in situ enhanced biological degradation, or "bioventing", pilot test for treatment of gasoline- contaminated soils at the Base Exchange Service Station (BXSS...

  10. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden about the plans for the final disposal of the radioactive waste products of the nuclear power. Part 1 describes the general background, the plans for research and development, including the necessary facilities. The time schedule and the calculated costs of the operations are presented. (G.B.)

  11. High-level waste management technology program plan

    Energy Technology Data Exchange (ETDEWEB)

    Harmon, H.D.

    1995-01-01

    The purpose of this plan is to document the integrated technology program plan for the Savannah River Site (SRS) High-Level Waste (HLW) Management System. The mission of the SRS HLW System is to receive and store SRS high-level wastes in a see and environmentally sound, and to convert these wastes into forms suitable for final disposal. These final disposal forms are borosilicate glass to be sent to the Federal Repository, Saltstone grout to be disposed of on site, and treated waste water to be released to the environment via a permitted outfall. Thus, the technology development activities described herein are those activities required to enable successful accomplishment of this mission. The technology program is based on specific needs of the SRS HLW System and organized following the systems engineering level 3 functions. Technology needs for each level 3 function are listed as reference, enhancements, and alternatives. Finally, FY-95 funding, deliverables, and schedules are s in Chapter IV with details on the specific tasks that are funded in FY-95 provided in Appendix A. The information in this report represents the vision of activities as defined at the beginning of the fiscal year. Depending on emergent issues, funding changes, and other factors, programs and milestones may be adjusted during the fiscal year. The FY-95 SRS HLW technology program strongly emphasizes startup support for the Defense Waste Processing Facility and In-Tank Precipitation. Closure of technical issues associated with these operations has been given highest priority. Consequently, efforts on longer term enhancements and alternatives are receiving minimal funding. However, High-Level Waste Management is committed to participation in the national Radioactive Waste Tank Remediation Technology Focus Area. 4 refs., 5 figs., 9 tabs.

  12. High-level waste management technology program plan

    International Nuclear Information System (INIS)

    Harmon, H.D.

    1995-01-01

    The purpose of this plan is to document the integrated technology program plan for the Savannah River Site (SRS) High-Level Waste (HLW) Management System. The mission of the SRS HLW System is to receive and store SRS high-level wastes in a see and environmentally sound, and to convert these wastes into forms suitable for final disposal. These final disposal forms are borosilicate glass to be sent to the Federal Repository, Saltstone grout to be disposed of on site, and treated waste water to be released to the environment via a permitted outfall. Thus, the technology development activities described herein are those activities required to enable successful accomplishment of this mission. The technology program is based on specific needs of the SRS HLW System and organized following the systems engineering level 3 functions. Technology needs for each level 3 function are listed as reference, enhancements, and alternatives. Finally, FY-95 funding, deliverables, and schedules are s in Chapter IV with details on the specific tasks that are funded in FY-95 provided in Appendix A. The information in this report represents the vision of activities as defined at the beginning of the fiscal year. Depending on emergent issues, funding changes, and other factors, programs and milestones may be adjusted during the fiscal year. The FY-95 SRS HLW technology program strongly emphasizes startup support for the Defense Waste Processing Facility and In-Tank Precipitation. Closure of technical issues associated with these operations has been given highest priority. Consequently, efforts on longer term enhancements and alternatives are receiving minimal funding. However, High-Level Waste Management is committed to participation in the national Radioactive Waste Tank Remediation Technology Focus Area. 4 refs., 5 figs., 9 tabs

  13. QUALITY ENHANCEMENT IN MAINTENANCE PLANNING THROUGH NON-IDENTICAL FMECA APPROACHES

    Directory of Open Access Journals (Sweden)

    Nilesh Pancholi

    2017-09-01

    Full Text Available The purpose of this paper is to investigate the scope of reliability improvement of aluminium wire rolling mill. This paper addresses the performance reliability of continuous process industry of interest to many applications in maintenance planning where multi-attribute decision making (MADM approaches are very useful. The paper addresses the process of discriminating critical components through substantial shop-floor failure data. The research work narrates a method for evaluating risk priority number (RPN traditionally. Moreover, the maintainability criticality index (MCI for each failure cause of identified critical components is evaluated through two disparate MADM failure models: technique for order preference by similarity to ideal solution (TOPSIS and preference section index (PSI to overcome the limitations of more traditional approaches. The primary findings of this research work are to enhance quality in planning the maintenance activities of critical components of targeted process industry through traditional as well as non-traditional failure analysis models. The research work is focused on potential failure causes of critical components like; bearings, gears, and shafts of aluminium wire rolling mill which are commonly representing the most critical components in a large range of industrial processes including aluminium wires. The proposed work will illustrate the working lives of components and associated failures. It will help to elucidate maintenance issues of major process industries and recommended deliverable keys.

  14. Dose enhancement in radiotherapy of small lung tumors using inline magnetic fields: A Monte Carlo based planning study

    Energy Technology Data Exchange (ETDEWEB)

    Oborn, B. M., E-mail: brad.oborn@gmail.com [Illawarra Cancer Care Centre (ICCC), Wollongong, NSW 2500, Australia and Centre for Medical Radiation Physics (CMRP), University of Wollongong, Wollongong, NSW 2500 (Australia); Ge, Y. [Sydney Medical School, University of Sydney, NSW 2006 (Australia); Hardcastle, N. [Northern Sydney Cancer Centre, Royal North Shore Hospital, Sydney, NSW 2065 (Australia); Metcalfe, P. E. [Centre for Medical Radiation Physics (CMRP), University of Wollongong, Wollongong NSW 2500, Australia and Ingham Institute for Applied Medical Research, Liverpool, NSW 2170 (Australia); Keall, P. J. [Sydney Medical School, University of Sydney, NSW 2006, Australia and Ingham Institute for Applied Medical Research, Liverpool, NSW 2170 (Australia)

    2016-01-15

    Purpose: To report on significant dose enhancement effects caused by magnetic fields aligned parallel to 6 MV photon beam radiotherapy of small lung tumors. Findings are applicable to future inline MRI-guided radiotherapy systems. Methods: A total of eight clinical lung tumor cases were recalculated using Monte Carlo methods, and external magnetic fields of 0.5, 1.0, and 3 T were included to observe the impact on dose to the planning target volume (PTV) and gross tumor volume (GTV). Three plans were 6 MV 3D-CRT plans while 6 were 6 MV IMRT. The GTV’s ranged from 0.8 to 16 cm{sup 3}, while the PTV’s ranged from 1 to 59 cm{sup 3}. In addition, the dose changes in a 30 cm diameter cylindrical water phantom were investigated for small beams. The central 20 cm of this phantom contained either water or lung density insert. Results: For single beams, an inline magnetic field of 1 T has a small impact in lung dose distributions by reducing the lateral scatter of secondary electrons, resulting in a small dose increase along the beam. Superposition of multiple small beams leads to significant dose enhancements. Clinically, this process occurs in the lung tissue typically surrounding the GTV, resulting in increases to the D{sub 98%} (PTV). Two isolated tumors with very small PTVs (3 and 6 cm{sup 3}) showed increases in D{sub 98%} of 23% and 22%. Larger PTVs of 13, 26, and 59 cm{sup 3} had increases of 9%, 6%, and 4%, describing a natural fall-off in enhancement with increasing PTV size. However, three PTVs bounded to the lung wall showed no significant increase, due to lack of dose enhancement in the denser PTV volume. In general, at 0.5 T, the GTV mean dose enhancement is around 60% lower than that at 1 T, while at 3 T, it is 5%–60% higher than 1 T. Conclusions: Monte Carlo methods have described significant and predictable dose enhancement effects in small lung tumor plans for 6 MV radiotherapy when an external inline magnetic field is included. Results of this study

  15. Enhancing infrastructure resilience through business continuity planning.

    Science.gov (United States)

    Fisher, Ronald; Norman, Michael; Klett, Mary

    2017-01-01

    Critical infrastructure is crucial to the functionality and wellbeing of the world around us. It is a complex network that works together to create an efficient society. The core components of critical infrastructure are dependent on one another to function at their full potential. Organisations face unprecedented environmental risks such as increased reliance on information technology and telecommunications, increased infrastructure interdependencies and globalisation. Successful organisations should integrate the components of cyber-physical and infrastructure interdependencies into a holistic risk framework. Physical security plans, cyber security plans and business continuity plans can help mitigate environmental risks. Cyber security plans are becoming the most crucial to have, yet are the least commonly found in organisations. As the reliance on cyber continues to grow, it is imperative that organisations update their business continuity and emergency preparedness activities to include this.

  16. Enhancing SAT Based Planning with Landmark Knowledge

    NARCIS (Netherlands)

    Elffers, J.; Konijnenberg, D.; Walraven, E.M.P.; Spaan, M.T.J.

    2013-01-01

    Several approaches exist to solve Artificial Intelligence planning problems, but little attention has been given to the combination of using landmark knowledge and satisfiability (SAT). Landmark knowledge has been exploited successfully in the heuristics of classical planning. Recently it was also

  17. Final environmental impact statement for the Nevada Test Site and off-site locations in the State of Nevada. Framework for the resource management plan, Volume 2

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this document is to publicize how the U.S. Department of Energy Nevada Operations Office (DOE/NV) proposes to develop and use a Resource Management Plan for the Nevada Test Site (NTS) so the public could comment on and assist in the following activities: (1) Developing the methods for creating and using the plan; (2) Identifying the values people place on manmade and natural resources found on the NTS; (3) Developing the goals the DOE/NV will use to guide the conservation and use of those resources; (4) Identifying the management actions needed to meet constraints and resource management goals; and (5) Incorporating the principles of ecosystem management into land and resource management on the NTS. This framework for the Resource Management Plan was developed in conjunction with the Environmental Impact Statement for the Nevada Test Site and off-site locations in the state of Nevada (NTS EIS) to take advantage of the extensive data collection and public participation activities associated with the National Environmental Policy Act. After public input was received during the comment period for the Draft NTS EIS, DOE/NV revised this description of the Resource Management Plan and published it with the NTS Final EIS. This revision includes the goals DOE/NV has developed for managing resources and land-use constraints. It also includes the final plans for developing the Resource Management Plan. These plans will guide DOE/NV as it develops a Resource Management Plan in the coming years

  18. 78 FR 21245 - Continuity of Operations Plan

    Science.gov (United States)

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  19. Integrating climate change into the transportation planning process : final report

    Science.gov (United States)

    2008-07-01

    The objective of this study is to advance the practice and application of transportation planning among state, regional, and local transportation planning agencies to successfully meet growing concerns about the relationship between transportation an...

  20. Phase 1A Final Report for the AREVA Team Enhanced Accident Tolerant Fuels Concepts

    Energy Technology Data Exchange (ETDEWEB)

    Morrell, Mike E. [AREVA Federal Services LLC, Charlotte, NC (United States)

    2015-03-19

    this and to keep the partners focused, the GR process was utilized. During this GR process each of the team members presented their findings to a board made up of technical experts from utilities, fuel manufacturing experts, fuel technical experts, and fuel research and development (R&D) experts. During the initial 2 years of the project there were several major accomplishments. These accomplishments, along with the implications for successfully implementing EATF, are; The experimental spark plasma sintering process (SPS) process was successfully used to produce fuel pellets containing either 10% SiC whiskers or nano-diamond particles. The ability to use this process enables the thermal margin enhancements of the fuel additives to be realized. Without the SPS process, the conventional process cannot support adding pellet additives in the required quantities; Coatings of Ti2AlC were successfully applied to Zircaloy-4 cladding. Testing of Ti2AlC coatings at Loss of Cooling Accident (LOCA) conditions showed reduced cladding oxidation compared to present un-coated Zircaloy-4 cladding. This achievement allows the presently used cladding system to be retained so that the 10 year schedule can be met. Having to implement a new cladding material will extend the development schedule beyond 10 years; Several documents were produced to support future development, testing, and licensing of EATF, including a design requirements traceability matrix, a draft business plan, a draft test plan, a draft regulatory plan, and the acceptance criteria for lead fuel assembly insertion into a commercial reactor. This preparatory work lays the foundation for ensuring the future development plans address all the areas required to test, license, and manufacture the new EATF; and In addition, the high velocity oxy-fuel and electrophoretic deposition (EPD) coating application processes were dropped from further consideration due to their inability to meet manufacturing criteria. This allows the

  1. Enhancement on infectious diseases nursing plan information system.

    Science.gov (United States)

    Yeh, Mei-Lin; Hao, Te-Hui; Hsu, Chien-Yeh

    2009-01-01

    Based on researches, the most time-consuming nursing activities, in teaching hospital, are: room patrols, the blood pressure survey, the body temperature pulse breath survey, the nursing record maintenance. The nursing record is one way to communicate data. It can allow the medical service team to understand what measures the nursing staff once did for sickness, as well as responses from sickness. Nevertheless, it is the key component to utilize the record with a clinical nursing plan, so as to provide a proficient health management. Since the maintenance of nursing plan is costly and time-consuming, therefore, it is essential to establish the nursing plan information system, which can effectively promote the nursing quality. This research main body comes from one infectious disease division nursing plan information system, which was developed in 1992, and its data base covers entire courtyard compatibility and various faculties characteristic nursing plan. The nursing staff often complained that this system is not user-friendly, its contents are not comprehensive, and sometimes it does not let staff choose the right diagnosis. Therefore this research is based on history analysis and the questionnaire survey procedure first, the infectious disease nursing plan use number of times, the frequency and the project content, then by the literature scientific theory and result of the improvement group discussion together. The original 38 infectious disease division nursing plan will be expanded to 45 nursing plans. Moreover, the common 38 infectious disease code (ICD-9), and its corresponding diagnosis items, shall automatically appear in the disease diagnose code field, so it would be better off for the nursing staff to set up the nursing plan efficiently. Infectious disease division nursing plan information system utilization ratio is promoted 9.6-folds, according to research outcome. Each task consumes 3.68 minutes beforehand-including computer program operation, the

  2. CHP plant Legionowo Poland - Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-12-01

    In 1997, a new Energy Law was passed in Poland. An important element of the law is that local energy planning is made obligatory. The law describes obligatory tasks and procedures for Polish municipalities related to planning and organisation of the energy sector. With the objective of supporting the Polish municipalities in their obligations according to the energy law of 1997, the project 'Energy Planning in Poland at Municipal Level - Support to Decision Makers' was launched. As part of the project, Municipal Guideline Reports have been elaborated for three model municipalities. These guidelines present the basis for the Energy Supply Plans in these municipalities. For the city of Legionowo, the following was recommended: 1. The planning processes initiated during the project should be continues/followed up, 2. Master Plan for the district heating system should be prepared, 3. The possibilities of establishment of a major natural gas-fired CHP plant of the Combined Cycle type should be investigated. The present report is the final Master Plan based on the following reports: Master Plan for Legionowo - Status Report; Master Plan for Legionowo - Hydraulic Analysis; CHP Plant Legionowo Poland - CHP Feasibility Analysis. The final Master Plan describes the status in the DH Company in Legionowo, possible improvements and an investment plan for the selected scenario. (BA)

  3. Accuracy and role of contrast-enhanced CT in diagnosis and surgical planning in 88 soft tissue tumours of extremities

    International Nuclear Information System (INIS)

    Verga, Lucia; Robiati, Sara; De Marchi, Armanda; Martorano, Domenico; Faletti, Carlo; Brach del Prever, Elena Maria; Linari, Alessandra; Boffano, Michele; Piana, Raimondo

    2016-01-01

    Soft tissue tumours (STT) require accurate diagnosis in order to identify potential malignancies. Preoperative planning is fundamental to avoid inadequate treatments. The role of contrast-enhanced computed tomography (CT) for local staging remains incompletely assessed. Aims of the study were to evaluate CT accuracy in discriminating active from aggressive tumours compared to histology and evaluate the role of CT angiography (CTA) in surgical planning. This retrospective cohort series of 88 cases from 1200 patients (7 %) was locally studied by contrast-enhanced CT and CTA in a referral centre: 74 malignant tumours, 14 benign lesions. Contrast-enhancement patterns and relationship of the mass with major vessels and bone were compared with histology on surgically excised samples. Sensitivity, specificity, positive and negative predictive values (PPV, NPV) were evaluated in discriminating active from aggressive tumours. Sensitivity in differentiating aggressive tumours from active lesions was 89 %, specificity 84 %, PPV 90 %, NPV 82 %. The relationship between mass and major vessels/bone was fundamental for surgical strategy respectively in 40 % and in 58 % of malignant tumours. Contrast-enhanced CT and CTA are effective in differentiating aggressive masses from active lesions in soft tissue and in depicting the relationship between tumour and adjacent bones and major vessels. (orig.)

  4. Test and Evaluation for Enhanced Security: A Quantitative Method to Incorporate Expert Knowledge into Test Planning Decisions.

    Energy Technology Data Exchange (ETDEWEB)

    Rizzo, Davinia [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Blackburn, Mark [Stevens Inst. of Technology, Hoboken, NJ (United States)

    2017-03-01

    Complex systems are comprised of technical, social, political and environmental factors as well as the programmatic factors of cost, schedule and risk. Testing these systems for enhanced security requires expert knowledge in many different fields. It is important to test these systems to ensure effectiveness, but testing is limited to due cost, schedule, safety, feasibility and a myriad of other reasons. Without an effective decision framework for Test and Evaluation (T&E) planning that can take into consideration technical as well as programmatic factors and leverage expert knowledge, security in complex systems may not be assessed effectively. Therefore, this paper covers the identification of the current T&E planning problem and an approach to include the full variety of factors and leverage expert knowledge in T&E planning through the use of Bayesian Networks (BN).

  5. Ecology of Greater Sage-Grouse in the Bi-State Planning Area Final Report, September 2007

    Science.gov (United States)

    Casazza, Michael L.; Overton, Cory T.; Farinha, Melissa A.; Torregrosa, Alicia; Fleskes, Joseph P.; Miller, Michael R.; Sedinger, James S.; Kolada, Eric J.

    2009-01-01

    completed in 2004 and 2005 addressed each of the specific objectives and this final report focuses on the biological information gathered in support of local conservation efforts. Participation in the development of the Bi-State Local Area Conservation Plan was accomplished on multiple scales. Beginning in the fall of 2002, USGS personnel began participating in meetings of local stakeholders involved in the development of a sage-grouse conservation plan for the Bi-State planning area. This included attendance at numerous local PMU group meetings and field trips as well as participating on the technical advisory committee (TAC) for the Bi-State group. Whenever appropriate, ongoing results and findings regarding sage-grouse ecology in the local area were incorporated into these working group meetings. In addition, the USGS partnered with CDFG to help reorganize one of the local PMU groups (South Mono) and edited that portion of the Bi-State plan. The USGS also worked closely with CDFG to draft a description of the state of knowledge for sage-grouse genetic information for inclusion in the Bi-State Conservation Plan. The first edition of the Bi-State Conservation Plan for Greater Sage-Grouse was completed in June 2004 (Bi-State Sage-grouse Conservation Team 2004). This report is organized primarily by PMU to facilitate the incorporation of these research findings into the individual PMU plans that compose the Bi-State plan. Information presented in this report was derived from over 7,000 radio-telemetry locations obtained on 145 individual sage-grouse during a three year period (2003-2005). In addition, we collected detailed vegetation measurements at over 590 habitat sampling plots within the study area including canopy cover, shrubs, forbs, and grasses diversity. Vegetation data collection focused on sage-grouse nests, and brood-use areas. Additionally we collected data at random sites to examine sage-grouse habitat relationships within the study area. The majori

  6. Final Hanford Site Transuranic (TRU) Waste Characterization Qualit Assurance Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP)

  7. Discrepancies between selected Pareto optimal plans and final deliverable plans in radiotherapy multi-criteria optimization.

    Science.gov (United States)

    Kyroudi, Archonteia; Petersson, Kristoffer; Ghandour, Sarah; Pachoud, Marc; Matzinger, Oscar; Ozsahin, Mahmut; Bourhis, Jean; Bochud, François; Moeckli, Raphaël

    2016-08-01

    Multi-criteria optimization provides decision makers with a range of clinical choices through Pareto plans that can be explored during real time navigation and then converted into deliverable plans. Our study shows that dosimetric differences can arise between the two steps, which could compromise the clinical choices made during navigation. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  8. Nuclear Station Facilities Improvement Planning

    International Nuclear Information System (INIS)

    Hooks, R. W.; Lunardini, A. L.; Zaben, O.

    1991-01-01

    An effective facilities improvement program will include a plan for the temporary relocation of personnel during the construction of an adjoining service building addition. Since the smooth continuation of plant operation is of paramount importance, the phasing plan is established to minimize the disruptions in day-to-day station operation and administration. This plan should consider the final occupancy arrangements and the transition to the new structure; for example, computer hookup and phase-in should be considered. The nuclear industry is placing more emphasis on safety and reliability of nuclear power plants. In order to do this, more emphasis is placed on operations and maintenance. This results in increased size of managerial, technical and maintenance staffs. This in turn requires improved office and service facilities. The facilities that require improvement may include training areas, rad waste processing and storage facilities, and maintenance facilities. This paper discusses an approach for developing an effective program to plan and implement these projects. These improvement projects can range in magnitude from modifying a simple system to building a new structure to allocating space for a future project. This paper addresses the planning required for the new structures with emphasis on site location, space allocation, and internal layout. Since facility planning has recently been completed by Sargent and Leyden at six U. S. nuclear stations, specific examples from some of those plants are presented. Site planning and the establishment of long-range goals are of the utmost importance when undertaking a facilities improvement program for a nuclear station. A plan that considers the total site usage will enhance the value of both the new and existing facilities. Proper planning at the beginning of the program can minimize costs and maximize the benefits of the program

  9. Data integration for statewide transportation planning : final report

    Science.gov (United States)

    2009-08-01

    The goal of this study was to investigate the data availability, accessibility, and interoperability issues arisen from the statewide : transportation planning activities undertaken at WisDOT and to identify possible approaches for addressing these i...

  10. Epistemic Planning

    DEFF Research Database (Denmark)

    Baral, Chitta; Bolander, Thomas; van Ditmarsch, Hans

    The seminar Epistemic Planning brought together the research communities of Dynamic Epistemic Logic, Knowledge Representation and Reasoning, and Automated Planning to address fundamental problems on the topic of epistemic planning. In the context of this seminar, dynamic epistemic logic...... investigates the formal semantics of communication and communicative actions, knowledge representation and reasoning focuses on theories of action and change, and automated planning investigates computational techniques and tools to generate plans. The original goals of the seminar were to develop benchmarks...... for epistemic planning, to explore the relationship between knowledge and belief in multi-agent epistemic planning, to develop models of agency and capability in epistemic planning and to explore action types and their representations (these originally separate goals were merged during the seminar), and finally...

  11. Energy planning and management plan

    International Nuclear Information System (INIS)

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  12. The response of the Government of Ontario to the final report of the Royal Commission on Electric Power Planning

    International Nuclear Information System (INIS)

    1981-05-01

    In March 1980, after nearly five years of hearings and research, the Ontario Royal Commission on Electric Power Planning submitted the first volume of its final report. The remaining eight volumes were submitted in April 1980. The Commission made 88 recommendations on technical, operational, and policy issues. The present document sets out the Ontario government's response to the recommendations. The government accepts and is implementing 77 recommendations. Four recommendations require further study, and six have been rejected

  13. 2006 Long Range Development Plan Final Environmental ImpactReport

    Energy Technology Data Exchange (ETDEWEB)

    Philliber, Jeff

    2007-01-22

    This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,' or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been

  14. Comment and response document for the final remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Revision 2

    International Nuclear Information System (INIS)

    1996-05-01

    This document for the final remedial action plan and site design has been prepared for US Department of Energy Environmental Restoration Division as part of the Uranium Mill Tailings Remedial Action plan. Comments and responses are included for the site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado

  15. Strategic planning of the National Direction of Nuclear Technology: period 2002-2005 last report; Planificacion estrategica de la Direccion Nacional de Tecnologia Nuclear: periodo 2002-2005 informe final

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-06-01

    The final report of strategic planning describes the uses and applications of the Nuclear Technology, situation, tendencies so much at international level as national, institutional organization of the Nuclear Sector in the Uruguay, assignment of the DNTN, nuclear politics of the Uruguay, development of the Net or Nuclear Sector and model proposed for Uruguay, general conclusions and Strategic Plan.

  16. Planning and Resource Allocation Management.

    Science.gov (United States)

    Coleman, Jack W.

    1986-01-01

    Modern scientific management techniques provide college administrators with valuable planning and resource allocation insights and enhances the decision process. The planning model should incorporate assessment, strategic planning, dynamic and long-term budgeting, operational planning, and feedback and control for actual operations. (MSE)

  17. LDRD project final report : hybrid AI/cognitive tactical behavior framework for LVC.

    Energy Technology Data Exchange (ETDEWEB)

    Djordjevich, Donna D.; Xavier, Patrick Gordon; Brannon, Nathan Gregory; Hart, Brian E.; Hart, Derek H.; Little, Charles Quentin; Oppel, Fred John III; Linebarger, John Michael; Parker, Eric Paul

    2012-01-01

    This Lab-Directed Research and Development (LDRD) sought to develop technology that enhances scenario construction speed, entity behavior robustness, and scalability in Live-Virtual-Constructive (LVC) simulation. We investigated issues in both simulation architecture and behavior modeling. We developed path-planning technology that improves the ability to express intent in the planning task while still permitting an efficient search algorithm. An LVC simulation demonstrated how this enables 'one-click' layout of squad tactical paths, as well as dynamic re-planning for simulated squads and for real and simulated mobile robots. We identified human response latencies that can be exploited in parallel/distributed architectures. We did an experimental study to determine where parallelization would be productive in Umbra-based force-on-force (FOF) simulations. We developed and implemented a data-driven simulation composition approach that solves entity class hierarchy issues and supports assurance of simulation fairness. Finally, we proposed a flexible framework to enable integration of multiple behavior modeling components that model working memory phenomena with different degrees of sophistication.

  18. Multiyear Program Plan for the High Temperature Materials Laboratory; FINAL

    International Nuclear Information System (INIS)

    Arvid E. Pasto

    2000-01-01

    Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO(sub x) and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required

  19. Final Hanford Site Transuranic (TRU) Waste Characterization Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    The Transuranic Waste Characterization Quality Assurance Program Plan required each US Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the QAPP

  20. Interactive Visual Intervention Planning: Interactive Visualization for Intervention Planning in Particle Accelerator Environments with Ionizing Radiation

    CERN Document Server

    Fabry, Thomas; Feral, Bruno

    2013-01-01

    Intervention planning is crucial for maintenance operations in particle accelerator environments with ionizing radiation, during which the radiation dose contracted by maintenance workers should be reduced to a minimum. In this context, we discuss the visualization aspects of a new software tool, which integrates interactive exploration of a scene depicting an accelerator facility augmented with residual radiation level simulations, with the visualization of intervention data such as the followed trajectory and maintenance tasks. The visualization of each of these aspects has its effect on the final predicted contracted radiation dose. In this context, we explore the possible benefits of a user study, with the goal of enhancing the visual conditions in which the intervention planner using the software tool is minimizing the radiation dose.

  1. Program Development Plan and Team up; FINAL

    International Nuclear Information System (INIS)

    Solar Electric Power Association

    2001-01-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead

  2. Rhode Island ITS/CVO business plan : final report

    Science.gov (United States)

    1998-01-01

    The Rhode Island Intelligent Transportation Systems/Commercial Vehicle Operations (ITS/CVO) Institutional Issues Study completed July 1996, substantiated the need for enhanced efficiency and safety in commercial transportation systems and regulation....

  3. National plan for the accelerated commercialization of solar energy. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-09-01

    After a brief profile of the Mid-American region and characterization of the residential and commercial markets and the industry of the region, a short description is given of a regional planning meeting held for the purpose of preparing input for the Mid-American section of the National Program for the Accelerated Commercialization of Solar Energy (NPAC) Implementation plans. For each of thirty-eight programs, the objective, rationale, task statement/description, evaluation measures, and implementor are given. The programs are in these areas: public education/awareness; education/training; legislative/regulatory; performance/analysis; design/planning;demonstrations; state interface; technology; information dissemination; legal and regulatory; analysis and assessment; and regional coordination. Two policy statements are included - one on cratering a solar society and the other recommending the expansion of the commercialization to encompass and include the concepts of utilization and popularization in the plan for the advancement of solar energy. (LEW)

  4. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    2000-01-01

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility

  5. 77 FR 14416 - Notice of Availability of a Final Environmental Impact Statement and Final Environmental Impact...

    Science.gov (United States)

    2012-03-09

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) has prepared a Proposed California Desert Conservation Area (CDCA) Plan Amendment (PA)/Final Environmental Impact Statement (EIS) and Final Environmental Impact Report (EIR) for the Ocotillo Express Wind Energy Facility (OWEF) and by this notice is announcing the availability of the Proposed PA and Final EIS/EIR.

  6. Methodology development to support NPR strategic planning. Final report

    International Nuclear Information System (INIS)

    1996-01-01

    This report covers the work performed in support of the Office of New Production Reactors during the 9 month period from January through September 1990. Because of the rapid pace of program activities during this time period, the emphasis on work performed shifted from the strategic planning emphasis toward supporting initiatives requiring a more immediate consideration and response. Consequently, the work performed has concentrated on researching and helping identify and resolve those issues considered to be of most immediate concern. Even though they are strongly interrelated, they can be separated into two broad categories as follows: The first category encompasses program internal concerns. Included are issues associated with the current demand for accelerating staff growth, satisfying the immediate need for appropriate skill and experience levels, team building efforts necessary to assure the development of an effective operating organization, ability of people and organizations to satisfactorily understand and execute their assigned roles and responsibilities, and the general facilitation of inter/intra organization communications and working relationships. The second category encompasses program execution concerns. These include those efforts required in development of realistic execution plans and implementation of appropriate control mechanisms which provide for effective forecasting, planning, managing, and controlling of on-going (or soon to be) program substantive activities according to the master integrated schedule and budget

  7. Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Urban, Mary Elizabeth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States). Process Modeling and Analysis Group

    2016-05-02

    Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, and monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.

  8. Research on Navigation Path Planning for An Underground Load Haul Dump

    Directory of Open Access Journals (Sweden)

    Qi Yulong

    2015-11-01

    Full Text Available The improved A * algorithm is a method of navigation path planning for articulated underground scrapers. Firstly, an environment model based on a mining Geographic Information System (GIS map is established, and then combined with improved A * algorithm, the underground global path planning problem of the intelligent Load Haul Dump (LHD is solved. In this paper, for the articulated structure, the method of expanding nodes by articulation angle is adopted to make expanded nodes meet the trajectory characteristics. In addition, collision threat cost is introduced in the evaluation function to avoid collisions between the LHD and the tunnel walls. As peran analysis of the simulation test to verify the effectiveness of the improved A * algorithm and a comparison with the traditional A * algorithm, the improved A * algorithm can enhance search efficiency. Acontrast of multiple sets of test parameters suggests that when the price weighted coefficient of collision is 0.2, the shortest path can be derived to avoid impact. Finally, tracking results indicate that the proposed algorithm for navigation path planning can maintain the tracking error to within 0.2 m in line with the structural characteristics of the scraper in the laboratory environment to realize the path planning of unmanned scrapers and trajectory tracking. Moreover, the algorithm can enhance the safety of scrapers and prevent roadway collisions. The feasibility and practicality of the proposed method is verified in this work.

  9. Effect of contrast-enhanced computed tomography on diagnosis and management of acute abdomen in adults

    International Nuclear Information System (INIS)

    Tsushima, Yoshito; Yamada, Shuji; Aoki, Jun; Motojima, Teiji; Endo, Keigo

    2002-01-01

    AIM: To determine the impact of computed tomography (CT) on the diagnosis and treatment plan in patients with acute abdominal pain. MATERIALS AND METHODS: A prospective study was undertaken in 125 adult patients presenting with acute abdominal pain (74 men and 51 women; 40.2 ± 19.3 years; range, 18-92). Changes in diagnosis, gain in percentage diagnostic certainty and changes of treatment plan of the surgeons in the emergency department before and after CT were evaluated. Pre- and post-CT diagnoses were compared with the final diagnoses. RESULTS: CT findings changed the initial diagnosis in 40 (32.0%) patients. The diagnostic certainty was 58.3 ± 22.9% before CT, and its gain after CT was 21.9 ± 18.5 points (P < 0.0001). Post-CT diagnoses were consistent with the final diagnosis in 116 patients (92.8%), while pre-CT diagnoses were correct in 89 patients (71.2%; P < 0.0001). Initial treatment plans were changed in 31 (24.8%) patients after CT. In 57 (45.6%) patients, CT information changed diagnoses and/or treatment plans. No significant differences were observed in the diagnosis, diagnostic certainty and treatment plan among four surgeons. CONCLUSION: Contrast-enhanced CT frequently changed the clinical diagnoses with increased diagnostic certainty and the initial treatment plans. Tsushima, Y. et al. (2002)

  10. Evaluation of factors important to enhance productivity

    Directory of Open Access Journals (Sweden)

    Sanjay Kumar

    2016-12-01

    Full Text Available Productivity as a measure for output is important to industry and academia. In this research, factors to enhance productivity have been identified from the literature by reviewing various international and national sources to explore this evergreen field of research that is “productivity,” which has always been an increasingly interesting area of research for researchers over decades or perhaps over centuries. In total, 15 number of factors have been identified to enhance productivity. Analytic hierarchy process approach has been appropriately chosen to rank these factors because of its simplicity and effectiveness. The tool has been used by taking perception of experts from the Indian manufacturing industry. Positive attitude and involvement of management, proactive employees, and good working conditions have been ranked as top three factors as per the experts’ opinion. The ranking of factors to enhance productivity, categorization of the factors into four perspectives, and hierarchy of perspective and action plan as a final outcome of the paper may help academia and operations managers toward effective management of “operations and production activities of firms/supply chains.”

  11. Nursing care plans versus concept maps in the enhancement of critical thinking skills in nursing students enrolled in a baccalaureate nursing program.

    Science.gov (United States)

    Sinatra-Wilhelm, Tina

    2012-01-01

    Appropriate and effective critical thinking and problem solving is necessary for all nurses in order to make complex decisions that improve patient outcomes, safety, and quality of nursing care. With the current emphasis on quality improvement, critical thinking ability is a noteworthy concern within the nursing profession. An in-depth review of literature related to critical thinking was performed. The use of nursing care plans and concept mapping to improve critical thinking skills was among the recommendations identified. This study compares the use of nursing care plans and concept mapping as a teaching strategy for the enhancement of critical thinking skills in baccalaureate level nursing students. The California Critical Thinking Skills Test was used as a method of comparison and evaluation. Results indicate that concept mapping enhances critical thinking skills in baccalaureate nursing students.

  12. 77 FR 74688 - Final Recovery Plan, First Revision; Mexican Spotted Owl

    Science.gov (United States)

    2012-12-17

    ... Arizona, Colorado, New Mexico, Texas, and Utah, and south through the Sierra Madre Occidental and Sierra... plants. ADDRESSES: If you wish to view the recovery plan, you may obtain a copy by any one of the... recovery plan. Background Recovery of endangered or threatened animals and plants to the point where they...

  13. Northeast Oregon Hatchery Project final siting report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  14. Electric utility system planning studies for OTEC power integration. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-11-30

    Florida Power Corporation (FPC) conducted an evaluation of the possible integration of OTEC into the FPC system. Existing system planning procedures, assumptions, and corporate financial criteria for planning new generating capacity were used without modification. A baseline configuration for an OTEC plant was developed for review with standard planning procedures. The OTEC plant characteristics and costs were incorporated in considerable detail. These basic inputs were examined using the FPC system planning methods. It was found that with the initial set of conditions, OTEC would not be economically viable. Using the same system planning procedures, a number of adjustments were made to the key study assumptions. It was found that two considerations dominate the analysis; the assumed rate of fuel cost escalation, and the projected capital cost of the OTEC plant. The analysis produced a parametric curve: on one hand, if fuel costs were to escalate at a rate greater than assumed (12% vs the assumed 5% for coal), and if no change were made to the OTEC input assumptions, the basic economic competitive criteria would be equivalent to the principal alternative, coal fueled plants. Conversely, if the projected cost of the OTEC plant were to be reduced from the assumed $2256/kW to $1450/kW, the economic competitiveness criterion would be satisfied. After corporate financial analysis, it was found that even if the cost competitive criterion were to be reached, the plan including OTEC could not be financed by Florida Power Corporation. Since, under the existing set of conditions for financing new plant capital requirements, FPC could not construct an OTEC plant, some other means of ownership would be necessary to integrate OTEC into the FPC system. An alternative such as a third party owning the plant and selling power to FPC, might prove attractive. (WHK)

  15. Narrative Finality

    Directory of Open Access Journals (Sweden)

    Armine Kotin Mortimer

    1981-01-01

    Full Text Available The cloturai device of narration as salvation represents the lack of finality in three novels. In De Beauvoir's Tous les hommes sont mortels an immortal character turns his story to account, but the novel makes a mockery of the historical sense by which men define themselves. In the closing pages of Butor's La Modification , the hero plans to write a book to save himself. Through the thrice-considered portrayal of the Paris-Rome relationship, the ending shows the reader how to bring about closure, but this collective critique written by readers will always be a future book. Simon's La Bataille de Pharsale , the most radical attempt to destroy finality, is an infinite text. No new text can be written. This extreme of perversion guarantees bliss (jouissance . If the ending of De Beauvoir's novel transfers the burden of non-final world onto a new victim, Butor's non-finality lies in the deferral to a future writing, while Simon's writer is stuck in a writing loop, in which writing has become its own end and hence can have no end. The deconstructive and tragic form of contemporary novels proclaims the loss of belief in a finality inherent in the written text, to the profit of writing itself.

  16. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  17. A planning concept incorporating the knowledge of both planning and operations personnel

    Energy Technology Data Exchange (ETDEWEB)

    Valenca, M M; Nepomuceno, L; Teixeira, J C.F.; Santos, Junior, A [Universidade Estadual de Campinas, SP (Brazil)

    1994-12-31

    In this paper, the electrical operation planning problem and the available technological possibilities for the improvement of planner`s work process are analyzed. The importance of the expert`s experience in efficient operation plans production is pointed out. The useful knowledge in planning and operating environments and their automation by Artificial Intelligence techniques are evaluated. Finally, conception of a decision-making support system allowing the interaction of storage expertise with analysis programs proposed, in order to improve the planning process. (author) 15 refs., 4 figs.

  18. 76 FR 57100 - Natural Resource Plan

    Science.gov (United States)

    2011-09-15

    ... TENNESSEE VALLEY AUTHORITY Natural Resource Plan AGENCY: Tennessee Valley Authority (TVA). ACTION... environmental impact statement (EIS) for the Natural Resource Plan (NRP). The notice of availability of the Final Environmental Impact Statement for the Natural Resource Plan was published in the Federal Register...

  19. Energy planning in Spain

    International Nuclear Information System (INIS)

    Cortina Garcia, J.

    1995-01-01

    This report aims to describe energy planning in Spain. It briefly analyses the three completed national energy plans (Plan Energetico Nacional, PEN). The fourth PEN 1991-2000 is analysed in detail, by reference to its objectives and characteristics and to developments during its first five years in operation. The Ministry of Industry and Energy has updated PEN en 1995, almost halfway through its period, and this is also summarised. Finally, there are some reflections on the future of energy planning. (Author) 46 refs

  20. Planning for risk-informed/performance-based fire protection at nuclear power plants. Final report

    International Nuclear Information System (INIS)

    Najafi, B.; Parkinson, W.J.; Lee, J.A.

    1997-12-01

    This document presents a framework for discussing issues and building consensus towards use of fire modeling and risk technology in nuclear power plant fire protection program implementation. The plan describes a three-phase approach: development of core technologies, implementation of methods, and finally, case studies and pilot applications to verify viability of such methods. The core technologies are defined as fire modeling, fire and system tests, use of operational data, and system and risk techniques. The implementation phase addresses the programmatic issues involved in implementing a risk-informed/performance-based approach in an integrated approach with risk/performance measures. The programmatic elements include: (1) a relationship with fire codes and standards development as defined by the ongoing effort of NFPA for development of performance-based standards; (2) the ability for NRC to undertake inspection and enforcement; and (3) the benefit to utilities in terms of cost versus safety. The case studies are intended to demonstrate applicability of single issue resolution while pilot applications are intended to check the applicability of the integrated program as a whole

  1. Facility Effluent Monitoring Plan for the Plutonium Finishing Plant (PFP); FINAL

    International Nuclear Information System (INIS)

    FRAZIER, T.P.

    1999-01-01

    A facility effluent monitoring plan is required by the U. S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. To ensure the long-range integrity of the effluent monitoring systems, an update to this facility effluent monitoring plan is required whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document is reviewed annually even if there are no operational changes, and is updated, at a minimum, every 3 years

  2. Umatilla Satellite and Release Sites Project : Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montgomery, James M.

    1992-04-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  3. An integrated GIS environment enhancing the operation and planning of power utilities

    International Nuclear Information System (INIS)

    Yared, George Antoine

    1996-05-01

    The evolution of electrical power systems was tightly geared by the development of two fields: power engineering, with the advanced technology of physical elements comprising all parts of a power system, and information processing tools to manage the performance of electric power utilities. Compared to power engineering that has gone through tremendous developments, information technology applications for electrical power systems are relatively young. The possible improvements of these applications are in their graphical, mapping an data analysis capabilities. State-of-the art information technology such as Geographic Information Systems provides these facilities. The objective of this thesis is to devise a technique that combines power system software tools with the Geographic Information Systems software to enhance the operation, control and planning of electrical transmission systems. The load flow, voltage control and fault analysis models for the transmission system will be re-engineered in a Geographic Information System environment.The research is generic, special attention is given to its application to the Lebanese electrical power system, which is recovering from an infrastructure devastating war. The research entails integrating power systems analysis and control package, or PSACP developed at the AUB within a Geographic Information Systems environment. This will enhance the power modeling capabilities by the use of powerful thematic mapping, geographic and data analysis and user interface techniques that come with Geographic Information Systems. An overview of the two technologies involved is presented, followed by a detailed description of the integration technique before describing the integrated system. Moving to a higher level, the features of the system are presented, followed by sample applications of the integrated system on the Lebanese electrical power system. The thesis contributes to the research arena by developing a software re

  4. Developing nursing care plans.

    Science.gov (United States)

    Ballantyne, Helen

    2016-02-24

    This article aims to enhance nurses' understanding of nursing care plans, reflecting on the past, present and future use of care planning. This involves consideration of the central theories of nursing and discussion of nursing models and the nursing process. An explanation is provided of how theories of nursing may be applied to care planning, in combination with clinical assessment tools, to ensure that care plans are context specific and patient centred.

  5. Quinault Indian Nation Renewable Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Don Hopps, Institute for Washington' s Future; Jesse Nelson, Institute for Washington' s Future

    2006-11-28

    project development. Specifically, this corporation can seek grant funding to research energy matters such as the BPA direct sale of energy proposal, identify key business opportunities like charcoal production and train QIN members in business building, and establish a renewable energy education program and center to enhance the education of QIN youth and market to schools and community colleges in Western Washington. Overall, this final report includes the final Renewable Energy Plan for the QIN, the final Financial Analysis, and appendices. The two final plans are the culmination of research and planning represented by the appendices.

  6. MO-B-BRB-00: Optimizing the Treatment Planning Process

    International Nuclear Information System (INIS)

    2015-01-01

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  7. MO-B-BRB-00: Optimizing the Treatment Planning Process

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  8. Project planning of Gen-IV sodium cooled fast reactor technology

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.

    2013-05-15

    The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO{sub 2} Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety.

  9. Project planning of Gen-IV sodium cooled fast reactor technology

    International Nuclear Information System (INIS)

    Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.

    2013-05-01

    The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO 2 Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety

  10. Canada's green plan: Summary. Le plan vert du Canada: Resume

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    A summary is presented of Canada's Green Plan, a comprehensive action plan to ensure a healthy environment for the future. The plan defines targets and schedules which will drive federal environmental initiatives, and incorporates concepts of sustainable development. Elements of the plan include initiatives to combat and prevent water pollution; control ocean dumping; control smog-causing emissions; provide tighter air pollution standards; provide for sound waste management according to the principles of reduce, reuse, recycle, and recover; assess and control chemical wastes; sustain Canadian forests and maintain their diversity while shifting forest management from sustained yield to sustainable development; maintain and enhance environmental sustainability in the agro-food sector and the fishery sector; preserve and protect national parks and wildlife; and preserve and enhance the integrity, health, biodiversity and productivity of Arctic ecosystems. With respect to global-scale problems, measures will be taken to stabilize greenhouse gas emissions, limit acid rain-related emissions, and phase out the use of ozone-depleting substances. The plan also intends to improve Canada's capability to respond to environmental emergencies, improve environmental decision-making by strengthening and building of partnerships, promote environmental science research and development, and make effective and balanced use of enviromental laws, with market-based approaches for environmental protection.

  11. 5 CFR 330.602 - Agency plans.

    Science.gov (United States)

    2010-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS RECRUITMENT, SELECTION, AND... Employees § 330.602 Agency plans. (a) Each agency will establish a Career Transition Assistance Plan (CTAP) to actively assist its surplus and displaced employees. A copy of the final plan and any additional...

  12. An Approach for Practical Multiobjective IMRT Treatment Planning

    International Nuclear Information System (INIS)

    Craft, David; Halabi, Tarek; Shih, Helen A.; Bortfeld, Thomas

    2007-01-01

    Purpose: To introduce and demonstrate a practical multiobjective treatment planning procedure for intensity-modulated radiation therapy (IMRT) planning. Methods and Materials: The creation of a database of Pareto optimal treatment plans proceeds in two steps. The first step solves an optimization problem that finds a single treatment plan which is close to a set of clinical aspirations. This plan provides an example of what is feasible, and is then used to determine mutually satisfiable hard constraints for the subsequent generation of the plan database. All optimizations are done using linear programming. Results: The two-step procedure is applied to a brain, a prostate, and a lung case. The plan databases created allow for the selection of a final treatment plan based on the observed tradeoffs between the various organs involved. Conclusions: The proposed method reduces the human iteration time common in IMRT treatment planning. Additionally, the database of plans, when properly viewed, allows the decision maker to make an informed final plan selection

  13. 78 FR 37846 - Resource Management Plan/General Plan and Environmental Impact Statement/Environmental Impact...

    Science.gov (United States)

    2013-06-24

    ...The Bureau of Reclamation and the California Department of Parks and Recreation (CDPR) have prepared a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Luis Reservoir State Recreation Area Resource Management Plan/General Plan (RMP/GP). The Final EIS/EIR describes and presents the environmental effects of the No Action/No Project Alternative and three Action Alternatives for implementing the RMP/GP. A Notice of Availability of the Draft EIS/EIR was published in the Federal Register on August 3, 2012 (77 FR 46518). The comment period on the Draft EIS/EIR ended on October 2, 2012. The Final EIS/EIR contains responses to all comments received and reflects comments and any additional information received during the review period.

  14. Guided preparedness planning with lay communities: enhancing capacity of rural emergency response through a systems-based partnership.

    Science.gov (United States)

    McCabe, O Lee; Perry, Charlene; Azur, Melissa; Taylor, Henry G; Gwon, Howard; Mosley, Adrian; Semon, Natalie; Links, Jonathan M

    2013-02-01

    Community disaster preparedness plans, particularly those with content that would mitigate the effects of psychological trauma on vulnerable rural populations, are often nonexistent or underdeveloped. The purpose of the study was to develop and evaluate a model of disaster mental health preparedness planning involving a partnership among three, key stakeholders in the public health system. A one-group, post-test, quasi-experimental design was used to assess outcomes as a function of an intervention designated Guided Preparedness Planning (GPP). The setting was the eastern-, northern-, and mid-shore region of the state of Maryland. Partner participants were four local health departments (LHDs), 100 faith-based organizations (FBOs), and one academic health center (AHC)-the latter, collaborating entities of the Johns Hopkins University and the Johns Hopkins Health System. Individual participants were 178 community residents recruited from counties of the above-referenced geographic area. Effectiveness of GPP was based on post-intervention assessments of trainee knowledge, skills, and attitudes supportive of community disaster mental health planning. Inferences about the practicability (feasibility) of the model were drawn from pre-defined criteria for partner readiness, willingness, and ability to participate in the project. Additional aims of the study were to determine if LHD leaders would be willing and able to generate post-project strategies to perpetuate project-initiated government/faith planning alliances (sustainability), and to develop portable methods and materials to enhance model application and impact in other health jurisdictions (scalability). The majority (95%) of the 178 lay citizens receiving the GPP intervention and submitting complete evaluations reported that planning-supportive objectives had been achieved. Moreover, all criteria for inferring model feasibility, sustainability, and scalability were met. Within the span of a six-month period

  15. Supplementation in the Columbia Basin : Summary Report Series : Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-12-01

    of Supplementation Project (RASP) was initiated as a result of a request by NPPC to address long-standing concerns about the need to coordinate supplementation research, monitoring and evaluation. Such coordination was also recommended by the Supplementation Technical Work Group. In August 1990, the NPPC gave conditional approval to proceed with the final design of the Yakima Production Project. The Council called on the Bonneville Power Administration (BPA) to fund immediately a supplementation assessment to reevaluate, prioritize and coordinate all existing and planned supplementation monitoring and evaluation activities in the basin. Providing for the participation of the fishery agencies and tribes and others having expertise in this area. RASP addresses four principal objectives: (1) provide an overview of ongoing and planned supplementation activities and identify critical uncertainties associated with supplementation, (2) construct a conceptual framework and model which estimates the potential benefits and risks of supplementation and prioritizes uncertainties, (3) provide guidelines for the development of supplementation projects, (4) develop a plan for regional coordination of research and monitoring. These objectives, once attained, will provide the technical tools fishery managers need to carry out the Council's direction to protect and enhance salmon and steelhead. RASP has further divided the four broad objectives into 12 technical topics: (1) definition of supplementation; (2) description of the diversity of supplementation projects; (3) objectives and performance standards; (4) identification of uncertainties; (5) supplementation theory; (6) development of a conceptual model of supplemented populations; (7) development of spreadsheet model of risks and benefits of supplementation; (8) classification of stocks, streams, and supplementation strategies; (9) regional design of supplementation evaluation and monitoring; (10) guidelines for planning

  16. 78 FR 25762 - Notice of Availability of the Final Trail Management Plan/Final Environmental Impact Statement...

    Science.gov (United States)

    2013-05-02

    ... Vaughn Road, Brecksville, Ohio 44141. The document is also available on the internet at the NPS Planning... paddling and parking areas, and guidance for the restoration and sustainability of the trail system for the...

  17. Quality assurance plan for placement of cold-cap grout, demonstration vault, Hanford Grout Vault Program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Harrington, P.T.; Wakeley, L.D.; Ernzen, J.J.; Walley, D.M.

    1992-08-01

    During FY 91, the U.S. Army Engineer Waterways Experiment Station (WES) developed a grout to be used as a cold cap, a nonradioactive layer, between the solidified waste and the cover blocks of a demonstration waste disposal vault at the U.S. Department of Energy Hanford Facility. This document recommends requirements for a quality assurance (QA) plan for field mixing and placing of the cold-cap grout during final closure of the demonstration vault. Preplacement activities emphasize selection and testing of materials that will match the performance of materials used in the WES grout. Materials sources and applicable American Society of Testing and Materials, American Concrete Institute, and American Petroleum Institute specifications and requirements are provided. Archiving of physical samples of materials is essential, in addition to careful maintenance of test reports and laboratory data. Full-scale field trial mixing and a detailed preconstruction conference are recommended. Placement activities focus on production and placement of a grout that remains sufficiently constant throughout all batches and meets performance requirements. QA activities must be coordinated between the batch plant and delivery site. Recommended sampling during placement includes cylinders cast for subsequent tests of compressive strength and for nondestructive evaluation and prisms cast for monitoring volume stability. A minimum of two lifts is recommended. Postplacement activities include long-term monitoring of the properties of grout specimens cast during placement. Minimum testing of cylinders includes pulse velocity, fundamental frequency, and unconfined compressive strength. Monitoring characteristics of the microstructure also are recommended. The QA plan should designate an organization to have responsibility for maintaining complete records, reports, and archived samples, including details of deviations from plans written before field placement.

  18. UOP HRM 300 Final Exam Guide (New, 2017) NEW

    OpenAIRE

    ADMIN

    2018-01-01

    UOP HRM 300 Final Exam Guide (New, 2017) NEW Check this A+ tutorial guideline at http://www.hrm300assignment.com/hrm-300-uop/hrm-300-final-exam-guide-latest For more classes visit http://www.hrm300assignment.com True and False: Please mark either T or F in the appropriate space before the question 1. ____A strategic plan is the company’s plan for how it will match its internal strengths and weaknesses with external opportunities and threats in or...

  19. The 'final order' problem

    NARCIS (Netherlands)

    Teunter, RH; Haneveld, WKK

    1998-01-01

    When the service department of a company selling machines stops producing and supplying spare parts for certain machines, customers are offered an opportunity to place a so-called final order for these spare parts. We focus on one customer with one machine. The customer plans to use this machine up

  20. Scenario Based Network Infrastructure Planning

    DEFF Research Database (Denmark)

    Knudsen, Thomas Phillip; Pedersen, Jens Myrup; Madsen, Ole Brun

    2005-01-01

    The paper presents a method for IT infrastructure planning that take into account very long term developments in usages. The method creates a scenario for a final, time independent stage in the planning process. The method abstracts relevant modelling factors from available information...

  1. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden concerning the plans for the final disposal of the radioactive waste products of the nuclear power. Part 2 describes the waste facilities in details. The layouts and estimated costs are presented. The decomissioning of nuclear power plants and the postponement of it is discussed. (G.B.)

  2. 78 FR 15797 - Service Delivery Plan

    Science.gov (United States)

    2013-03-12

    ... SOCIAL SECURITY ADMINISTRATION [Docket No. SSA-2012-0048] Service Delivery Plan AGENCY: Social... input as we finalize our Service Delivery Plan (SDP). We designed our SDP as a roadmap for how we will... Plan. DATES: To ensure that we consider your comments, we must receive them no later than April 11...

  3. SU-F-J-71: Improving CT Quality for Radiation Therapy Planning and Delivery Guidance Using a Non-Linear Contrast Enhancement Technique

    Energy Technology Data Exchange (ETDEWEB)

    Noid, G; Tai, A; Li, X [Medical College of Wisconsin, Milwaukee, WI (United States)

    2016-06-15

    Purpose: Advanced image post-processing techniques which enhance soft-tissue contrast in CT have not been widely employed for RT planning or delivery guidance. The purpose of this work is to assess the soft-tissue contrast enhancement from non-linear contrast enhancing filters and its impact in RT. The contrast enhancement reduces patient alignment uncertainties. Methods: Non-linear contrast enhancing methods, such as Best Contrast (Siemens), amplify small differences in X-ray attenuation between two adjacent structure without significantly increasing noise. Best Contrast (BC) separates a CT into two frequency bands. The low frequency band is modified by a non-linear scaling function before recombination with the high frequency band. CT data collected using a CT-on-rails (Definition AS Open, Siemens) during daily CT-guided RT for 6 prostate cancer patients and an image quality phantom (The Phantom Laboratory) were analyzed. Images acquired with a standard protocol (120 kVp, 0.6 pitch, 18 mGy CTDIvol) were processed before comparison to the unaltered images. Contrast and noise were measured in the the phantom. Inter-observer variation was assessed by placing prostate contours on the 12 CT study sets, 6 enhanced and 6 unaltered, in a blinded study involving 8 observers. Results: The phantom data demonstrate that BC increased the contrast between the 1.0% supra-slice element and the background substrate by 46.5 HU while noise increased by only 2.3 HU. Thus the contrast to noise ratio increased from 1.28 to 6.71. Furthermore, the variation in centroid position of the prostate contours was decreased from 1.3±0.4 mm to 0.8±0.3 mm. Thus the CTV-to-PTV margin was reduced by 1.1 mm. The uncertainty in delineation of the prostate/rectum edge decreased by 0.5 mm. Conclusion: As demonstrated in phantom and patient scans the BC filter accentuates soft-tissue contrast. This enhancement leads to reduced inter-observer variation, which should improve RT planning and delivery

  4. Patient Protection and Affordable Care Act; HHS Notice of Benefit and Payment Parameters for 2018; Amendments to Special Enrollment Periods and the Consumer Operated and Oriented Plan Program. Final rule.

    Science.gov (United States)

    2016-12-22

    This final rule sets forth payment parameters and provisions related to the risk adjustment program; cost-sharing parameters and cost-sharing reductions; and user fees for Federally-facilitated Exchanges and State-based Exchanges on the Federal platform. It also provides additional guidance relating to standardized options; qualified health plans; consumer assistance tools; network adequacy; the Small Business Health Options Programs; stand-alone dental plans; fair health insurance premiums; guaranteed availability and guaranteed renewability; the medical loss ratio program; eligibility and enrollment; appeals; consumer-operated and oriented plans; special enrollment periods; and other related topics.

  5. Efforts in enhancing social contacts of persons with severe of profound intellectual and multiple disabilities : Analysing individual support plans in the Netherlands

    NARCIS (Netherlands)

    Kamstra, Aafke; van der Putten, Annette; Vlaskamp, Carla

    2017-01-01

    Most people with profound intellectual and multiple disabilities (PIMD) have limited social contact and it is unclear what is done to maintain or increase these contacts. Individual support planning (ISP) can be used in the systematic enhancement of social contacts. This study analyses the content

  6. Improving the Operations of the Earth Observing One Mission via Automated Mission Planning

    Science.gov (United States)

    Chien, Steve A.; Tran, Daniel; Rabideau, Gregg; Schaffer, Steve; Mandl, Daniel; Frye, Stuart

    2010-01-01

    We describe the modeling and reasoning about operations constraints in an automated mission planning system for an earth observing satellite - EO-1. We first discuss the large number of elements that can be naturally represented in an expressive planning and scheduling framework. We then describe a number of constraints that challenge the current state of the art in automated planning systems and discuss how we modeled these constraints as well as discuss tradeoffs in representation versus efficiency. Finally we describe the challenges in efficiently generating operations plans for this mission. These discussions involve lessons learned from an operations model that has been in use since Fall 2004 (called R4) as well as a newer more accurate operations model operational since June 2009 (called R5). We present analysis of the R5 software documenting a significant (greater than 50%) increase in the number of weekly observations scheduled by the EO-1 mission. We also show that the R5 mission planning system produces schedules within 15% of an upper bound on optimal schedules. This operational enhancement has created value of millions of dollars US over the projected remaining lifetime of the EO-1 mission.

  7. 75 FR 64197 - Additional Rules Regarding Hybrid Retirement Plans

    Science.gov (United States)

    2010-10-19

    ... regulations which include in the definition of an applicable defined benefit plan any defined benefit plan (or... benefits as the current value of an accumulated percentage of the participant's final average compensation... accumulated percentage of the participant's final average compensation and (2) the benefit attributable to...

  8. Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System

    Science.gov (United States)

    Court, Laurence E.; Kisling, Kelly; McCarroll, Rachel; Zhang, Lifei; Yang, Jinzhong; Simonds, Hannah; du Toit, Monique; Trauernicht, Chris; Burger, Hester; Parkes, Jeannette; Mejia, Mike; Bojador, Maureen; Balter, Peter; Branco, Daniela; Steinmann, Angela; Baltz, Garrett; Gay, Skylar; Anderson, Brian; Cardenas, Carlos; Jhingran, Anuja; Shaitelman, Simona; Bogler, Oliver; Schmeller, Kathleen; Followill, David; Howell, Rebecca; Nelson, Christopher; Peterson, Christine; Beadle, Beth

    2018-01-01

    The Radiation Planning Assistant (RPA) is a system developed for the fully automated creation of radiotherapy treatment plans, including volume-modulated arc therapy (VMAT) plans for patients with head/neck cancer and 4-field box plans for patients with cervical cancer. It is a combination of specially developed in-house software that uses an application programming interface to communicate with a commercial radiotherapy treatment planning system. It also interfaces with a commercial secondary dose verification software. The necessary inputs to the system are a Treatment Plan Order, approved by the radiation oncologist, and a simulation computed tomography (CT) image, approved by the radiographer. The RPA then generates a complete radiotherapy treatment plan. For the cervical cancer treatment plans, no additional user intervention is necessary until the plan is complete. For head/neck treatment plans, after the normal tissue and some of the target structures are automatically delineated on the CT image, the radiation oncologist must review the contours, making edits if necessary. They also delineate the gross tumor volume. The RPA then completes the treatment planning process, creating a VMAT plan. Finally, the completed plan must be reviewed by qualified clinical staff. PMID:29708544

  9. The Robot Path Planning Based on Improved Artificial Fish Swarm Algorithm

    Directory of Open Access Journals (Sweden)

    Yi Zhang

    2016-01-01

    Full Text Available Path planning is critical to the efficiency and fidelity of robot navigation. The solution of robot path planning is to seek a collision-free and the shortest path from the start node to target node. In this paper, we propose a new improved artificial fish swarm algorithm (IAFSA to process the mobile robot path planning problem in a real environment. In IAFSA, an attenuation function is introduced to improve the visual of standard AFSA and get the balance of global search and local search; also, an adaptive operator is introduced to enhance the adaptive ability of step. Besides, a concept of inertia weight factor is proposed in IAFSA inspired by PSO intelligence algorithm to improve the convergence rate and accuracy of IAFSA. Five unconstrained optimization test functions are given to illustrate the strong searching ability and ideal convergence of IAFSA. Finally, the ROS (robot operation system based experiment is carried out on a Pioneer 3-DX mobile robot; the experiment results also show the superiority of IAFSA.

  10. International benchmark and best practices on national infrastructure plans. Application to Spanish strategic planning

    Energy Technology Data Exchange (ETDEWEB)

    Pino Hernandez, E.M.; Delgado Quiralte, C.

    2016-07-01

    The need for planning regarding investment in infrastructures is recognised and supported by most governments around the world. Planning helps to take effective and correct decisions, provides a basis for monitoring its impacts and also facilitates further developments. However it requires a high level of organization, coordination among stakeholders and anticipation of transport needs. There are some different methodological approaches for strategic planning. This paper examines the importance of infrastructure planning and how it is undertaken in different countries from Europe and other continents. It is based on a benchmarking about planning procedures of 7 reference countries (UK, France, the Netherlands, Poland, Germany, Japan and USA), in addition to others whose strategic plans are being developed at the present moment such as Croatia or Romania. This benchmarking aims to extract and compare best practices carried out in this field and to define the optimal formulation of strategic planning. In this regard, the benchmarking is focused on some key aspects: firstly, on the plan structure and its main contents. There are a lot of differences about how each country defines the future needs for transport and how it establishes the objectives and the strategies to be followed. Secondly, on the characterisation of the authorities which are responsible of the plan development (level of dependence from the government, know-how…) along with the time frame and final validity of the plans. And finally, the level of detail of the proposed actions and budgetary commitments provided by the strategic plans. Throughout the comparative analysis, the knowledge generated by this benchmarking has allowed setting a series of specific recommendations in strategic planning which can be applied as innovative solutions and best practices in future planning processes in Spain. (Author)

  11. Integrating design and production planning with knowledge-based inspection planning system

    International Nuclear Information System (INIS)

    Abbasi, Ghaleb Y.; Ketan, Hussein S.; Adil, Mazen B.

    2005-01-01

    In this paper an intelligent environment to integrate design and inspection earlier to the design stage. A hybrid knowledge-based approach integrating computer-aided design (CAD) and computer-aided inspection planning (CAIP) was developed, thereafter called computer-aided design and inspection planning (CADIP). CADIP was adopted for automated dimensional inspection planning. Critical functional features were screened based on certain attributes for part features for inspection planning application. Testing the model resulted in minimizing the number of probing vectors associated with the most important features in the inspected prismatic part, significant reduction in inspection costs and release of human labor. In totality, this tends to increase customer satisfaction as a final goal of the developed system. (author)

  12. Strategic planning--a plan for excellence for South Haven Health System.

    Science.gov (United States)

    Urbanski, Joanne; Baskel, Maureen; Martelli, Mary

    2011-01-01

    South Haven Health System has developed an innovative approach to strategic planning. The key to success of this process has been the multidisciplinary involvement of all stakeholders from the first planning session through the final formation of a strategic plan with measurable objectives for each goal. The process utilizes a Conversation Café method for identifying opportunities and establishing goals, Strategic Oversight Teams to address each goal and a Champion for implementation of each objective. Progress is measured quarterly by Strategic Oversight Team report cards. Transparency of communication within the organization and the sharing of information move the plan forward. The feedback from participant evaluations has been overwhelmingly positive. They are involved and excited.

  13. 242-A Campaign 99-1 process control plan; FINAL

    International Nuclear Information System (INIS)

    LE, E.Q.

    1999-01-01

    242-A Evaporator 99-1 will process approximately one million gallons of waste from tank 102-AW in June 1999. The process control Plan provides a general description of activities, which will occur during 242-A Evaporator Campaign 99-1 and to document analyses conducted to demonstrate that 102-AW waste is acceptable for processing. Predict is a registered trademark of Risk Decisions England Corporation, United Kingdom

  14. Medicaid and Children's Health Insurance Programs: essential health benefits in alternative benefit plans, eligibility notices, fair hearing and appeal processes, and premiums and cost sharing; exchanges: eligibility and enrollment. Final rule.

    Science.gov (United States)

    2013-07-15

    This final rule implements provisions of the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively referred to as the Affordable Care Act. This final rule finalizes new Medicaid eligibility provisions; finalizes changes related to electronic Medicaid and the Children's Health Insurance Program (CHIP) eligibility notices and delegation of appeals; modernizes and streamlines existing Medicaid eligibility rules; revises CHIP rules relating to the substitution of coverage to improve the coordination of CHIP coverage with other coverage; and amends requirements for benchmark and benchmark-equivalent benefit packages consistent with sections 1937 of the Social Security Act (which we refer to as ``alternative benefit plans'') to ensure that these benefit packages include essential health benefits and meet certain other minimum standards. This rule also implements specific provisions including those related to authorized representatives, notices, and verification of eligibility for qualifying coverage in an eligible employer-sponsored plan for Affordable Insurance Exchanges. This rule also updates and simplifies the complex Medicaid premium and cost sharing requirements, to promote the most effective use of services, and to assist states in identifying cost sharing flexibilities. It includes transition policies for 2014 as applicable.

  15. Next Generation Safeguards Initiative Workshop on Enhanced Recruiting for International Safeguards

    International Nuclear Information System (INIS)

    Pepper, S.E.; Rosenthal, M.D.; Fishbone, L.G.; Occhogrosso, D.M.; Lockwood, D.; Carroll, C.J.; Dreicer, M.; Wallace, R.; Fankhauser, J.

    2009-01-01

    Brookhaven National Laboratory (BNL) hosted a Workshop on Enhanced Recruiting for International Safeguards October 22 and 23, 2008. The workshop was sponsored by DOE/NA-243 under the Next Generation Safeguards Initiative (NGSI). Placing well-qualified Americans in sufficient number and in key safeguards positions within the International Atomic Energy Agency's (IAEA's) Department of Safeguards is an important U.S. non-proliferation objective. The goal of the NGSI Workshop on Enhanced Recruiting for International Safeguards was to improve U.S. efforts to recruit U.S. citizens for IAEA positions in the Department of Safeguards. The participants considered the specific challenges of recruiting professional staff, safeguards inspectors, and managers. BNL's International Safeguards Project Office invited participants from the U.S. Department of Energy, the IAEA, U.S. national laboratories, private industry, academia, and professional societies who are either experts in international safeguards or who understand the challenges of recruiting for technical positions. A final report for the workshop will be finalized and distributed in early 2009. The main finding of the workshop was the need for an integrated recruitment plan to take into account pools of potential candidates, various government and private agency stakeholders, the needs of the IAEA, and the NGSI human capital development plan. There were numerous findings related to and recommendations for maximizing the placement of U.S. experts in IAEA Safeguards positions. The workshop participants offered many ideas for increasing the pool of candidates and increasing the placement rate. This paper will provide details on these findings and recommendations

  16. Next Generation Safeguards Initiative Workshop on Enhanced Recruiting for International Safeguards

    Energy Technology Data Exchange (ETDEWEB)

    Pepper,S.E.; Rosenthal, M.D.; Fishbone, L.G.; Occhogrosso, D.M.; Lockwood, D.; Carroll, C.J.; Dreicer, M.; Wallace, R.; Fankhauser, J.

    2009-07-12

    Brookhaven National Laboratory (BNL) hosted a Workshop on Enhanced Recruiting for International Safeguards October 22 and 23, 2008. The workshop was sponsored by DOE/NA-243 under the Next Generation Safeguards Initiative (NGSI). Placing well-qualified Americans in sufficient number and in key safeguards positions within the International Atomic Energy Agency’s (IAEA’s) Department of Safeguards is an important U.S. non-proliferation objective. The goal of the NGSI Workshop on Enhanced Recruiting for International Safeguards was to improve U.S. efforts to recruit U.S. citizens for IAEA positions in the Department of Safeguards. The participants considered the specific challenges of recruiting professional staff, safeguards inspectors, and managers. BNL’s International Safeguards Project Office invited participants from the U.S. Department of Energy, the IAEA, U.S. national laboratories, private industry, academia, and professional societies who are either experts in international safeguards or who understand the challenges of recruiting for technical positions. A final report for the workshop will be finalized and distributed in early 2009. The main finding of the workshop was the need for an integrated recruitment plan to take into account pools of potential candidates, various government and private agency stakeholders, the needs of the IAEA, and the NGSI human capital development plan. There were numerous findings related to and recommendations for maximizing the placement of U.S. experts in IAEA Safeguards positions. The workshop participants offered many ideas for increasing the pool of candidates and increasing the placement rate. This paper will provide details on these findings and recommendations

  17. Emergency plan belgian experience

    International Nuclear Information System (INIS)

    Clymans, A.

    1989-01-01

    The Chernobyl disaster prompted authorities in Belgium to carry out a comprehensive review of all emergency plans and, in particular, those designed specifically for nuclear accidents. This review was aimed at determining what type of plans existed and to what extent such plans were operational. This paper sets out to present a broad overview of different aspects of this problem: organization of public emergency plans, co-ordination of operations, merits and demerits of centralization as opposed to decentralization, planning zones, obligation to release information to the public and relations with the media, and finally the international dimension to the problem. The author expresses the hope that the latter area will inspire practical suggestions [fr

  18. Kootenai River Wildlife Habitat Enhancement Project : Long-term Bighorn Sheep/Mule Deer Winter and Spring Habitat Improvement Project : Wildlife Mitigation Project, Libby Dam, Montana : Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Yde, Chis

    1990-06-01

    The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer winter and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.

  19. Directing a Quality Enhancement Plan

    Directory of Open Access Journals (Sweden)

    Ronald A. Styron, Jr.

    2015-08-01

    Full Text Available This paper is drawn from a project aimed at enhancing the quality of instructional practice and improving studentlearning outcomes in classes across an urban university located in the southern region of the United States. The strategies, employed by the project leader, are discussed in detail as framed by a new problem-solving leadership design called the Alloy Improvement Model (AIM. Data collected at the end of the second full year and reported in this paper indicated all project goals were met and that the utilization of the AIM was central to project success.

  20. Final Report: Evaluation of Tools and Metrics to Support Employer Selection of Health Plans.

    Science.gov (United States)

    Mattke, Soeren; Van Busum, Kristin R; Martsolf, Grant R

    2014-01-01

    The Patient Protection and Affordable Care Act (ACA) places strong emphasis on quality of care as a means to improve outcomes for Americans and promote the financial sustainability of our health care system. Included in the ACA are new disclosure requirements that require health plans to provide a summary of benefits and coverage that accurately describes the benefits under the plan or coverage. These requirements are intended to support employers' procurement of high-value health coverage for their employees. This study attempts to help employers understand the structural differences between health plans and the performance dimensions along which plans can differ, as well as to educate employers about available tools that can be used to evaluate plan options. The study also discusses the extent to which these and other tools or resources are used by employers to inform choices between health plans.

  1. Therapeutic treatment plan optimization with probability density-based dose prescription

    International Nuclear Information System (INIS)

    Lian Jun; Cotrutz, Cristian; Xing Lei

    2003-01-01

    The dose optimization in inverse planning is realized under the guidance of an objective function. The prescription doses in a conventional approach are usually rigid values, defining in most instances an ill-conditioned optimization problem. In this work, we propose a more general dose optimization scheme based on a statistical formalism [Xing et al., Med. Phys. 21, 2348-2358 (1999)]. Instead of a rigid dose, the prescription to a structure is specified by a preference function, which describes the user's preference over other doses in case the most desired dose is not attainable. The variation range of the prescription dose and the shape of the preference function are predesigned by the user based on prior clinical experience. Consequently, during the iterative optimization process, the prescription dose is allowed to deviate, with a certain preference level, from the most desired dose. By not restricting the prescription dose to a fixed value, the optimization problem becomes less ill-defined. The conventional inverse planning algorithm represents a special case of the new formalism. An iterative dose optimization algorithm is used to optimize the system. The performance of the proposed technique is systematically studied using a hypothetical C-shaped tumor with an abutting circular critical structure and a prostate case. It is shown that the final dose distribution can be manipulated flexibly by tuning the shape of the preference function and that using a preference function can lead to optimized dose distributions in accordance with the planner's specification. The proposed framework offers an effective mechanism to formalize the planner's priorities over different possible clinical scenarios and incorporate them into dose optimization. The enhanced control over the final plan may greatly facilitate the IMRT treatment planning process

  2. Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mill, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Dong, Changgui [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sigrin, Ben [National Renewable Energy Lab. (NREL), Golden, CO (United States); Zuboy, Jarrett [Independent Consultant

    2016-08-19

    The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. 1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. 2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. 3) Characterizing DPV as a resource option: Today’s most comprehensive plans account for all of DPV’s monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. 4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. 5) Accounting for DPV’s location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. 6) Estimating DPV’s impact on transmission and distribution investments: Innovative practices are being

  3. Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Andrew D.; Barbose, Galen L.; Seel, Joachim; Dong, Changgui; Mai, Trieu; Sigrin, Ben; Zuboy, Jarett

    2016-08-01

    The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. (1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. (2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. (3) Characterizing DPV as a resource option: Today's most comprehensive plans account for all of DPV's monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. (4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. (5) Accounting for DPV's location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. (6) Estimating DPV's impact on transmission and distribution investments: Innovative

  4. 75 FR 28287 - Final Plan for Fiscal Year 2010

    Science.gov (United States)

    2010-05-20

    ... of systemic advocacy, enhance the quality of juvenile indigent defense representation, and ensure... and Family Court Judges provides training and technical assistance. Enforcing Underage Drinking Laws Program The Enforcing Underage Drinking Laws (EUDL) Program supports States' efforts to reduce drinking by...

  5. Dosimetric parameters of enhanced dynamic wedge for treatment planning and verification

    International Nuclear Information System (INIS)

    Leavitt, Dennis D.; Lee, Wing Lok; Gaffney, David K.

    1996-01-01

    Purpose/Objective: Enhanced Dynamic Wedge (EDW) is an intensity-modulated radiotherapy technique in which one collimating jaw sweeps across the field to define a desired wedge dose distribution while dose rate is modified according to jaw position. This tool enables discrete or continuous wedge angles from zero to sixty degrees for field widths from three cm to 30 cm in the direction of the wedge, and up to 40 cm perpendicular to the wedge direction. Additionally, asymmetric wedge fields not centered on the line through isocenter can be created for applications such as tangential breast irradiation. The unique range of field shapes and wedge angles introduce a new set of dosimetric challenges to be resolved before routine clinical use of EDW, and especially require that a simple set of independent dose calculation and verification techniques be developed to check computerized treatment planning results. Using terminology in common use in treatment planning, this work defines the effective wedge factor vs. field width and wedge angle, evaluates the depth dose vs. open field values, defines primary intensity functions from which specific dynamic wedges can be calculated in treatment planning systems, and describes the technique for independent calculation of Monitor Units for EDW fields. Materials and Methods: Using 6- and 18-MV beams from a CI2100C, EDW beam profiles were measured in water phantom for depths from near-surface to 30 cm for the full range of field widths and wedge angles using a linear detector array of 25 energy-compensated diodes. Asymmetric wedge field profiles were likewise measured. Depth doses were measured in water phantom using an ionization chamber sequentially positioned to depths of 30 cm. Effective wedge factors for the full range of field widths and wedge angles were measured using an ionization chamber in water-equivalent plastic at a depth of 10 cm on central axis. Dose profiles were calculated by computer as the summation of a series

  6. Regional power systems planning: a state of the art assessment. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    The purpose of this report was to define regional power systems planning problems, the tools available and their shortcomings, and to document all of the above in a concise readable form. The approach consisted of a survey and literature search. The survey determined the tools being used by utilities, the tools they had rejected, and the tools they planned to try out. The literature search was conducted for the purpose of documenting the tools available, and performing a comparative analysis of these tools. The project included a mix of utility, university, and consulting organizations. Several organizations were consulted in the selection of the participants. A non-profit organization, The University of Oklahoma, was selected to manage the project. The results were reviewed in a series of four one day meetings by known authorities in each field. This report consists of the results of this project. Perhaps its major finding is that several aspects of the regional planning problem are not well defined, the roles of the various participants in regional planning is not clear, and certainly research is needed for the development of new methodology.

  7. Development of a Plan to Implement Enhanced Geothermal Systems (EGS) in the Animas Valley, New Mexico - Final Report - 07/26/2000 - 02/01/2001; FINAL

    International Nuclear Information System (INIS)

    Schochet, Daniel N.; Cunniff, Roy A.

    2001-01-01

    The concept of producing energy from hot dry rock (HDR), originally proposed in 1971 at the Los Alamos National Laboratory, contemplated the generation of electric power by injecting water into artificially created fractures in subsurface rock formations with high heat flow. Recognizing the inherent difficulties associated with HDR, the concept of Enhanced Geothermal Systems was proposed. This embraces the idea that the amount of permeability and fluid in geothermal resources varies across a spectrum, with HDR at one end, and conventional hydrothermal systems at the other. This report provides a concept for development of a ''Combined Technologies Project'' with construction and operation of a 6 MW (net) binary-cycle geothermal power plant that uses both the intermediate-depth hydrothermal system at 1,200 to 3,300 feet and a deeper EGS capable system at 3,000 to 4,000 feet. Two production/injection well pairs will be drilled, one couplet for the hydrothermal system, and one for the E GS system. High-pressure injection may be required to drive fluid through the EGS reservoir from the injection to the production well

  8. 14 CFR 259.5 - Customer service plan.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Customer service plan. 259.5 Section 259.5... REGULATIONS ENHANCED PROTECTIONS FOR AIRLINE PASSENGERS § 259.5 Customer service plan. (a) Adoption of Plan. Each covered carrier shall adopt a Customer Service Plan applicable to its scheduled flights and shall...

  9. MO-B-BRB-01: Optimize Treatment Planning Process in Clinical Environment

    International Nuclear Information System (INIS)

    Feng, W.

    2015-01-01

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  10. MO-B-BRB-01: Optimize Treatment Planning Process in Clinical Environment

    Energy Technology Data Exchange (ETDEWEB)

    Feng, W. [New York Presbyterian Hospital (United States)

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  11. Treatment Planning for Ion Beam Therapy

    Science.gov (United States)

    Jäkel, Oliver

    The special aspects of treatment planning for ion beams are outlined in this chapter, starting with positioning and immobilization of the patient, describing imaging and segmentation, definition of treatment parameters, dose calculation and optimization, and, finally, plan assessment, verification, and quality assurance.

  12. 77 FR 15121 - Final Land Protection Plan and Final Environmental Assessment for Everglades Headwaters National...

    Science.gov (United States)

    2012-03-14

    ... State, Federal, and municipal ownership and management. We would not pursue new opportunities for refuge... provide quality habitats for native wildlife diversity and at-risk species; to enhance water quality... conservation area would be created. Habitat protection and management would continue by existing organizations...

  13. Can a More User-Friendly Medicare Plan Finder Improve Consumers' Selection of Medicare Plans?

    Science.gov (United States)

    Martino, Steven C; Kanouse, David E; Miranda, David J; Elliott, Marc N

    2017-10-01

    To evaluate the efficacy for consumers of two potential enhancements to the Medicare Plan Finder (MPF)-a simplified data display and a "quick links" home page designed to match the specific tasks that users seek to accomplish on the MPF. Participants (N = 641) were seniors and adult caregivers of seniors who were recruited from a national online panel. Participants browsed a simulated version of the MPF, made a hypothetical plan choice, and reported on their experience. Participants were randomly assigned to one of eight conditions in a fully factorial design: 2 home pages (quick links, current MPF home page) × 2 data displays (simplified, current MPF display) × 2 plan types (stand-alone prescription drug plan [PDP], Medicare Advantage plan with prescription drug coverage [MA-PD]). The quick links page resulted in more favorable perceptions of the MPF, improved users' understanding of the information, and increased the probability of choosing the objectively best plan. The simplified data display resulted in a more favorable evaluation of the website, better comprehension of the displayed information, and, among those choosing a PDP only, an increased probability of choosing the best plan. Design enhancements could markedly improve average website users' understanding, ability to use, and experience of using the MPF. © Health Research and Educational Trust.

  14. Site planning for a final nuclear disposal site without rights of action? On the actual draft for a site selection law

    International Nuclear Information System (INIS)

    Wollenteit, Ulrich

    2013-01-01

    'Good' and 'substantial' grounds for determining the location of a Federal final repository by law are not apparent. The acceleration argument from the Stendal decision is not available. The legitimacy argument provides no substantial reason for believing that the implementation of an administrative planning permission hearing or approval procedure is associated with significant disadvantages for the common weal. Thus, there is no justifiable reason for a reduction of legal protection. However, the fundamental right to legal protection guarantee requires that the expropriation may be examined comprehensively on its legality in factual and legal relationship by means of the judiciary power.

  15. Urban and energy planning in Santiago de Compostela : Final Report

    NARCIS (Netherlands)

    Fernandez Maldonado, A.M.

    2015-01-01

    The purpose of Deliverable 4.2 is to give an overview of urban energy planning in the six PLEEC partner cities. The six reports illustrate how cities deal with different challenges of the urban energy transformation from a structural perspective including issues of urban governance and spatial

  16. Enhanced Yields in Organic Arable Crop Production by Eco-Functional Intensification using Intercropping

    DEFF Research Database (Denmark)

    Jensen, Erik Steen; Bedoussac, Laurent; Carlsson, Georg

    2015-01-01

    for enhancing yields in OA. EFI involves activating more knowledge and intensifying the beneficial effects of ecosystem functions, including agrobiodiversity (planned and associated) and soil fertility, and refocusing the importance of ecosystems services in agriculture. Organic farmers manage agrobiodiversity...... in space by intercropping, fitted into the organic crop rotation, has a strong potential to increase yield and hereby reduce the global environmental effects performance such as GHG per kg organic grain. Finally, we discuss likely barriers for increased use of intercropping in organic farming and suggest...... by planned crop diversification in time (crop rotation). However, cultivating genetically identical plants in OA sole crops (SC), limits resource use efficiency and yield per unit area. Intercropping (IC) of annual species or cultivars, perennial polycultures of forage or grain crops and agroforestry...

  17. Agent independent task planning

    Science.gov (United States)

    Davis, William S.

    1990-01-01

    Agent-Independent Planning is a technique that allows the construction of activity plans without regard to the agent that will perform them. Once generated, a plan is then validated and translated into instructions for a particular agent, whether a robot, crewmember, or software-based control system. Because Space Station Freedom (SSF) is planned for orbital operations for approximately thirty years, it will almost certainly experience numerous enhancements and upgrades, including upgrades in robotic manipulators. Agent-Independent Planning provides the capability to construct plans for SSF operations, independent of specific robotic systems, by combining techniques of object oriented modeling, nonlinear planning and temporal logic. Since a plan is validated using the physical and functional models of a particular agent, new robotic systems can be developed and integrated with existing operations in a robust manner. This technique also provides the capability to generate plans for crewmembers with varying skill levels, and later apply these same plans to more sophisticated robotic manipulators made available by evolutions in technology.

  18. Planning using dynamic epistemic logic: Correspondence and complexity

    DEFF Research Database (Denmark)

    Jensen, Martin Holm

    2013-01-01

    A growing community investigates planning using dynamic epistemic logic. Another framework based on similar ideas is knowledge-based programs as plans. Here we show how actions correspond in the two frameworks. We finally discuss fragments of DEL planning obtained by the restriction of event models...

  19. Network location theory and contingency planning

    Energy Technology Data Exchange (ETDEWEB)

    Hakimi, S L

    1983-08-01

    A brief survey of results in network location theory is first presented. Then, a systems view of contingency planning is described. Finally, some results in location theory are re-examined and it is shown that they are motivated by contingency planning considerations. Some new issues and problems in location theory are described, which, if properly tackled, will have a substantial impact on contingency planning in transportation.

  20. Health insurance premium tax credit. Final regulations.

    Science.gov (United States)

    2013-02-01

    This document contains final regulations relating to the health insurance premium tax credit enacted by the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010.These final regulations provide guidance to individuals related to employees who may enroll in eligible employer-sponsored coverage and who wish to enroll in qualified health plans through Affordable Insurance Exchanges (Exchanges) and claim the premium tax credit.

  1. The Godparent Plan: A Pedagogical Strategy for CS1 Accompaniment and CS2 Pedagogical Enhancement

    Directory of Open Access Journals (Sweden)

    Pedro Guillermo Feijóo-García

    2018-02-01

    Full Text Available Courses such as CS1 and CS2 can present an interesting pedagogical challenge when it comes to the theory-practice relationship, along with aspects that involve the course's logistics, the programming language used, and the characteristics of the students involved in the process. This study presents an innovative didactic approach, oriented towards the accompaniment of CS1 students by CS2 students at Universidad El Bosque, Colombia, seeking with this Godparent Plan, to provide a personalized accompaniment to first semester students, whereby CS2 students enhance their domain over concepts and skills while accompanying, explaining and teaching younger peers. The results of this study are favorable, outlining a didactic scheme that can be adapted and replicated in other curricular scenarios.

  2. Market-stage analysis enhances strategic planning.

    Science.gov (United States)

    McDonald, R B

    1998-07-01

    Changing market conditions are challenging healthcare organizations to determine how to allocate resources and make operational planning decisions to prepare for future changes. A vital part of meeting these challenges is understanding the impact of market stages, and using that knowledge to build effective business strategies. Financial modeling that includes market-stage information provides insight into market opportunities and presents a clearer picture of the organizational changes that will need to be implemented at each stage. Effective strategic action should take into account critical success factors in market responsiveness, organizational responsiveness, operational effectiveness, and financial strength.

  3. 78 FR 23491 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2013-04-19

    ... Management Planning; Correction AGENCY: Forest Service, USDA. ACTION: Correcting amendment. SUMMARY: This..., revising, and monitoring land management plans (the planning rule). The National Forest Management Act... Land Management Planning Rule Final Programmatic Environmental Impact Statement of January 2012. List...

  4. Budget model can aid group practice planning.

    Science.gov (United States)

    Bender, A D

    1991-12-01

    A medical practice can enhance its planning by developing a budgetary model to test effects of planning assumptions on its profitability and cash requirements. A model focusing on patient visits, payment mix, patient mix, and fee and payment schedules can help assess effects of proposed decisions. A planning model is not a substitute for planning but should complement a plan that includes mission, goals, values, strategic issues, and different outcomes.

  5. 77 FR 21161 - National Forest System Land Management Planning

    Science.gov (United States)

    2012-04-09

    ... 219 National Forest System Land Management Planning; Final Rule #0;#0;Federal Register / Vol. 77 , No... Forest Service 36 CFR Part 219 RIN 0596-AD02 National Forest System Land Management Planning AGENCY... Agriculture is adopting a new National Forest System land management planning rule (planning rule). The new...

  6. Work zone design and operation enhancements : final report, March 2010.

    Science.gov (United States)

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  7. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    International Nuclear Information System (INIS)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions

  8. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  9. Transport of radioactive wastes to the planned final waste repository Konrad: Radiation exposure resulting from normal transport and radiological risks from transport accidents

    International Nuclear Information System (INIS)

    Lange, F.; Fett, H.J.; Gruendler, D.; Schwarz, G.

    1993-01-01

    Radiation exposures of members of critical groups of the general population and of transport personnel resulting from normal transport of radioactive wastes to the planned final waste repository Konrad have been evaluated in detail. By applying probabilistic safety assessment techniques radiological risks from transport accidents have been analysed by quantifying potential radiation exposures and contaminations of the biosphere in connection with their expected frequencies of occurrence. The Konrad transport study concentrates on the local region of the waste repository, where all transports converge. (orig.) [de

  10. Enhancing Transportation Equity Analysis for Long Range Planning and Decision Making

    OpenAIRE

    Bills, Tierra Suzan

    2013-01-01

    Metropolitan Planning Organizations (MPOs) regularly perform equity analyses for their long-range transportation plans, as this is required by Environmental Justice regulations. These regional-level plans may propose hundreds of transportation infrastructure and policy changes (e.g. highway and transit extensions, fare changes, pricing schemes, etc.) as well as land-use policy changes. The challenge is to assess the distribution of impacts from all the proposed changes across different popula...

  11. Impact of cone-beam computed tomography on implant planning and on prediction of implant size

    Energy Technology Data Exchange (ETDEWEB)

    Pedroso, Ludmila Assuncao de Mello; Silva, Maria Alves Garcia Santos, E-mail: ludmilapedroso@hotmail.com [Universidade Federal de Goias (UFG), Goiania, GO (Brazil). Fac. de Odontologia; Garcia, Robson Rodrigues [Universidade Federal de Goias (UFG), Goiania, GO (Brazil). Fac. de Odontologia. Dept. de Medicina Oral; Leles, Jose Luiz Rodrigues [Universidade Paulista (UNIP), Goiania, GO (Brazil). Fac. de Odontologia. Dept. de Cirurgia; Leles, Claudio Rodrigues [Universidade Federal de Goias (UFG), Goiania, GO (Brazil). Fac. de Odontologia. Dept. de Prevencao e Reabilitacao Oral

    2013-11-15

    The aim was to investigate the impact of cone-beam computed tomography (CBCT) on implant planning and on prediction of final implant size. Consecutive patients referred for implant treatment were submitted to clinical examination, panoramic (PAN) radiography and a CBCT exam. Initial planning of implant length and width was assessed based on clinical and PAN exams, and final planning, on CBCT exam to complement diagnosis. The actual dimensions of the implants placed during surgery were compared with those obtained during initial and final planning, using the McNemmar test (p < 0.05). The final sample comprised 95 implants in 27 patients, distributed over the maxilla and mandible. Agreement in implant length was 50.5% between initial and final planning, and correct prediction of the actual implant length was 40.0% and 69.5%, using PAN and CBCT exams, respectively. Agreement in implant width assessment ranged from 69.5% to 73.7%. A paired comparison of the frequency of changes between initial or final planning and implant placement (McNemmar test) showed greater frequency of changes in initial planning for implant length (p < 0.001), but not for implant width (p = 0.850). The frequency of changes was not influenced by implant location at any stage of implant planning (chi-square test, p > 0.05). It was concluded that CBCT improves the ability of predicting the actual implant length and reduces inaccuracy in surgical dental implant planning. (author)

  12. Mobilization plan for the Y-12 9409-5 tank storage facility RCRA closure plan. Final report. Revision 1

    International Nuclear Information System (INIS)

    1993-11-01

    This mobilization plan identifies the activities and equipment necessary to begin the field sampling for the Oak Ridge Y-12 9409-5 Diked Tank Storage Facility (DTSF) Resource Conservation and Recovery Act (RCRA) closure. Elements of the plan outline the necessary components of each mobilization task and identify whether SAIC or the Martin Marietta Energy Systems, Inc. Y-12 Environmental Restoration Division will be responsible for task coordination. Field work will be conducted in two phases: mobilization phase and soil sampling phase. Training and medical monitoring, access, permits and passes, decontamination/staging area, equipment, and management are covered in this document

  13. Geodiversity action plans for the enhancement of geoheritage in the Piemonte region (north-western Italy

    Directory of Open Access Journals (Sweden)

    Elena Ferrero

    2012-07-01

    Full Text Available A geoethical approach to geodiversity allows better understanding of the value of abiotic nature and enhances its conservation and development. Our basic assumption is that even during an economical crisis, geoheritage sites can serve both public and private interests. A set of nine strategic geothematic areas were chosen to represent the geodiversity of the Piemonte region, north-western Italy, each of which is characterized by great potential for scientific studies, enhancement of public understanding of science, recreational activities, and economic support to the local communities. Specialized research teams individuated critical aspects to advance our knowledge of the geological history of the Piemonte region, through climate and environmental changes, natural hazards, soil processes, and georesources. The scientific concepts and techniques were coupled with geodiffusion actions and products: not only geosites, but also museum collections, evidence of mining and quarrying activities, science exhibitions, and nature trails. The preliminary results have allowed action plans to be developed with local partners, to assess the geoheritage management requirements. A series of investigations were carried out to improve the visual representation of the geological processes and the evolutionary scenarios. Further outcomes of the project will include didactic tools for educators, schools, and the public in general.

  14. Mid-Term Assessment of the EU Drugs Strategy 2013-2020 and Final Evaluation of the Action Plan on Drugs 2013-2016: Final report.

    Science.gov (United States)

    Emilie, Balbirnie; Matthew, Davies; Emma, Disley; Cristina Gonzalez, Monsalve; Stephen, Hartka; Stijn, Hoorens; Kristy, Kruithof; Martin, Sacher; Jirka, Taylor

    2018-01-01

    The aim of the EU Drugs Strategy 2013-2020 is to contribute to a reduction in drug demand and drug supply within the EU. The Strategy has so far been implemented by an Action Plan covering the period 2013-2016. This article sets out the findings of an evaluation that assesses the degree of implementation of the Strategy and the Action Plan in terms of outputs and, where possible, impacts. It looks at the extent to which the objectives of the Strategy have been achieved. The evaluation aims to provide evidence to support the European Commission's decision about whether to propose a new Action Plan for the period 2017-2020 and, if so, what changes would be needed compared to the current plan. Through applying a mixed-methods approach, the evaluation examined the effectiveness, efficiency, relevance and coherence of the actions undertaken on the basis of the EU Drugs Strategy and the Action Plan, as well as their EU added value. The evaluation makes 20 recommendations, addressed to the European Commission, Member States, the European Council and other stakeholders. The key recommendation for the Commission is that a new Action Plan should be implemented for the period 2017-2020. This should be an updated version of the current Action Plan, rather than taking a new approach or introducing more new actions.

  15. ENHANCED PROACTIVE PLANNING APPROACH: A CRUCIAL TO AN IMPROVED WORKERS’ SAFETY IN WESTERN NIGERIA SMALL SCALE INDUSTRY

    Directory of Open Access Journals (Sweden)

    H.O. ADEYEMI

    2016-12-01

    Full Text Available This study evaluated managements’ proactive planning approach (PPA to enhance safety among workers in South-western Nigeria small scale industry (SSI. The main objective was to rate the managements’ efforts at eliminating risk among their employees. By worker participatory and psychological survey approach, three tools were used; workplace observation (visual, management safety culture (questionnaire and managers interviews (oral. The survey included 200 workers, 120 supervisors and 80 managers, in 82 SSI. Four steps to a safety proactive action plans (PAP, (looking for clues, prioritization of identified potential hazard, making improvements to eliminate the risk and follow up, were rated by employees on a scale from 0 to 5. Paired t-test was used to appraise the significant difference between the managers’ mean scores rated by the supervisors and other workers. 77.1% of workers and 64.2% supervisors rated their managers as either “not done at all” or “poorly done”. Workers’ scores for managers PPA had statistically significantly lower ratings (mean=1.09, SEM = 0.22 compared to that of the supervisors rating (mean= 1.55, SEM = 0.32, with t (14 = -1.185, p = 0.784. There is a closed poor performance perception gaps, of managers’ PPA, of the two groups of employees. It can be concluded that safety is not emphasized, by managers of SSI, as overriding priority and this may have contributed to high reported injuries among their workforce. Courses to enhance managements’ understanding for inclusion of safety among the leading priorities becomes necessary. This will reduce work-related risks and promotes occupational safety and health among the group of workers.

  16. Final Sampling and Analysis Plan for Background Sampling, Fort Sheridan, Illinois

    National Research Council Canada - National Science Library

    1995-01-01

    .... This Background Sampling and Analysis Plan (BSAP) is designed to address this issue through the collection of additional background samples at Fort Sheridan to support the statistical analysis and the Baseline Risk Assessment (BRA...

  17. RTSTEP regional transportation simulation tool for emergency planning - final report.

    Energy Technology Data Exchange (ETDEWEB)

    Ley, H.; Sokolov, V.; Hope, M.; Auld, J.; Zhang, K.; Park, Y.; Kang, X. (Energy Systems)

    2012-01-20

    Large-scale evacuations from major cities during no-notice events - such as chemical or radiological attacks, hazardous material spills, or earthquakes - have an obvious impact on large regions rather than on just the directly affected area. The scope of impact includes the accommodation of emergency evacuation traffic throughout a very large area; the planning of resources to respond appropriately to the needs of the affected population; the placement of medical supplies and decontamination equipment; and the assessment and determination of primary escape routes, as well as routes for incoming emergency responders. Compared to events with advance notice, such as evacuations based on hurricanes approaching an affected area, the response to no-notice events relies exclusively on pre-planning and general regional emergency preparedness. Another unique issue is the lack of a full and immediate understanding of the underlying threats to the population, making it even more essential to gain extensive knowledge of the available resources, the chain of command, and established procedures. Given the size of the area affected, an advanced understanding of the regional transportation systems is essential to help with the planning for such events. The objectives of the work described here (carried out by Argonne National Laboratory) is the development of a multi-modal regional transportation model that allows for the analysis of different evacuation scenarios and emergency response strategies to build a wealth of knowledge that can be used to develop appropriate regional emergency response plans. The focus of this work is on the effects of no-notice evacuations on the regional transportation network, as well as the response of the transportation network to the sudden and unusual demand. The effects are dynamic in nature, with scenarios changing potentially from minute to minute. The response to a radiological or chemical hazard will be based on the time-delayed dispersion of

  18. Tribal child welfare. Interim final rule.

    Science.gov (United States)

    2012-01-06

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.

  19. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Science.gov (United States)

    2010-10-01

    ... to State and regional agencies. (2) Documentation of the State's project implementation capability, identifying and demonstrating the ability to implement the plan, including: (i) Established eligibility...) Demonstration that the State has the capability to effectively manage the HMGP as well as other mitigation grant...

  20. Development of advanced methods for planning electric energy distribution systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Goenen, T.; Foote, B.L.; Thompson, J.C.; Fagan, J.E.

    1979-10-01

    An extensive search was made for the identification and collection of reports published in the open literature which describes distribution planning methods and techniques. In addition, a questionnaire has been prepared and sent to a large number of electric power utility companies. A large number of these companies were visited and/or their distribution planners interviewed for the identification and description of distribution system planning methods and techniques used by these electric power utility companies and other commercial entities. Distribution systems planning models were reviewed and a set of new mixed-integer programming models were developed for the optimal expansion of the distribution systems. The models help the planner to select: (1) optimum substation locations; (2) optimum substation expansions; (3) optimum substation transformer sizes; (4) optimum load transfers between substations; (5) optimum feeder routes and sizes subject to a set of specified constraints. The models permit following existing right-of-ways and avoid areas where feeders and substations cannot be constructed. The results of computer runs were analyzed for adequacy in serving projected loads within regulation limits for both normal and emergency operation.

  1. The planning of decommissioning activities within nuclear facilities - Generating a Baseline Decommissioning Plan

    International Nuclear Information System (INIS)

    Meek, N.C.; Ingram, S.; Page, J.

    2003-01-01

    BNFL Environmental Services has developed planning tools to meet the emerging need for nuclear liabilities management and decommissioning engineering both in the UK and globally. It can provide a comprehensive baseline planning service primarily aimed at nuclear power stations and nuclear plant. The paper develops the following issues: Decommissioning planning; The baseline decommissioning plan;The process; Work package; Compiling the information; Deliverables summary; Customer Benefits; - Planning tool for nuclear liability life-cycle management; - Robust and reliable plans based upon 'real' experience; - Advanced financial planning; - Ascertaining risk; - Strategy and business planning. The following Deliverables are mentioned:1. Site Work Breakdown Structure; 2. Development of site implementation strategy from the high level decommissioning strategy; 3. An end point definition for the site; 4. Buildings, operational systems and plant surveys; 5. A schedule of condition for the site; 6. Development of technical approach for decommissioning for each work package; 7. Cost estimate to WBS level 5 for each work package; 8. Estimate of decommissioning waste arisings for each work package; 9. Preparation of complete decommissioning programme in planning software to suit client; 10. Risk modelling of work package and overall project levels; 11. Roll up of costs into an overall cost model; 12. Cash flow, waste profiling and resource profiling against the decommissioning programme; 13. Preparation and issue of Final Report. Finally The BDP process is represented by a flowchart listing the following stages: [Power Station project assigned] → [Review project and conduct Characterisation review of power station] → [Identify work packages] → [Set up WBS to level 3] → [Assign work packages] → [Update WBS to level 4] →[Develop cost model] → [Develop logic network] → [Develop risk management procedure] ] → [Develop project strategy document]→ [Work package

  2. 105-C Reactor interim safe storage project technology integration plan

    International Nuclear Information System (INIS)

    Pulsford, S.K.

    1997-01-01

    The 105-C Reactor Interim Safe Storage Project Technology Integration Plan involves the decontamination, dismantlement, and interim safe storage of a surplus production reactor. A major goal is to identify and demonstrate new and innovative D and D technologies that will reduce costs, shorten schedules, enhance safety, and have the potential for general use across the RL complex. Innovative technologies are to be demonstrated in the following areas: Characterization; Decontamination; Waste Disposition; Dismantlement, Segmentation, and Demolition; Facility Stabilization; and Health and Safety. The evaluation and ranking of innovative technologies has been completed. Demonstrations will be selected from the ranked technologies according to priority. The contractor team members will review and evaluate the demonstration performances and make final recommendations to DOE

  3. [Research programs in radiotherapy]. DOE final report, 1996

    International Nuclear Information System (INIS)

    DeNardo, S.J.

    1996-01-01

    Results which have not yet been published in detail are reported here on the following associated studies: Progress in the area of macrocyclic chelates for targeted therapy; Progress in biologic activation with radioimmunoconjugate therapy: Association of molecular receptor increase and tumor response in ChL6/L6 protocol patients; Progress in genetically engineered Lym-1 single chain molecules; Progress in analysis of molecular genetic coded messages to enhance tumor response; Progress on development and validation of planar imaging for therapy planning systems; Progress in development of a 3-D treatment planning system using SPECT; Progress in development of methods to evaluate enhancement of tumor penetration in a murine model; and Progress in clinical applications

  4. [Research programs in radiotherapy]. DOE final report, 1996

    Energy Technology Data Exchange (ETDEWEB)

    DeNardo, S.J.

    1996-12-31

    Results which have not yet been published in detail are reported here on the following associated studies: Progress in the area of macrocyclic chelates for targeted therapy; Progress in biologic activation with radioimmunoconjugate therapy: Association of molecular receptor increase and tumor response in ChL6/L6 protocol patients; Progress in genetically engineered Lym-1 single chain molecules; Progress in analysis of molecular genetic coded messages to enhance tumor response; Progress on development and validation of planar imaging for therapy planning systems; Progress in development of a 3-D treatment planning system using SPECT; Progress in development of methods to evaluate enhancement of tumor penetration in a murine model; and Progress in clinical applications.

  5. Constraint-based Attribute and Interval Planning

    Science.gov (United States)

    Jonsson, Ari; Frank, Jeremy

    2013-01-01

    In this paper we describe Constraint-based Attribute and Interval Planning (CAIP), a paradigm for representing and reasoning about plans. The paradigm enables the description of planning domains with time, resources, concurrent activities, mutual exclusions among sets of activities, disjunctive preconditions and conditional effects. We provide a theoretical foundation for the paradigm, based on temporal intervals and attributes. We then show how the plans are naturally expressed by networks of constraints, and show that the process of planning maps directly to dynamic constraint reasoning. In addition, we de ne compatibilities, a compact mechanism for describing planning domains. We describe how this framework can incorporate the use of constraint reasoning technology to improve planning. Finally, we describe EUROPA, an implementation of the CAIP framework.

  6. Standard review plan on antitrust reviews. Final report

    International Nuclear Information System (INIS)

    Lambe, W.M.; Davis, M.J.

    1997-12-01

    This standard review plan describes the procedures used by NRC staff to implement the antitrust review and enforcement provisions in Sections 105 and 186 of the Atomic Energy Act of 1954, as amended (the Act), and replaces NUREG-0970. These procedures are principally derived from the Commission's Rules and Regulations in 10 CFR Sections 2.101, 2.102, Part 2-Appendix A, Section X, 50.33a, 50.80, 50.90, and 52.77. These procedures set forth the steps and criteria the staff uses in antitrust reviews of construction permit applications, operating license applications, combined construction permit/operating license applications, combined construction permit/operating license applications, and applications for approval of the transfer of construction permits, operating licenses, and combined licenses. In addition, the procedures describe how the staff enforces compliance with antitrust conditions appended to licenses

  7. Collaborating with Industry to Enhance Financial Planning and Accounting Education

    Directory of Open Access Journals (Sweden)

    Mark Brimble

    2012-11-01

    Full Text Available Higher education is integral to the professionalisation of financial planning in Australia. However, thetraditional separation between ‘content’ and ‘practice’ in tertiary curriculum does not necessarily equipstudents with the skills required to apply the content in a professional context. Contextualisation of thefinancial planning curriculum requires collaboration between higher education institutions and the professionto develop authentic learning environments, such as work-integrated learning (WIL. This paper describes thecollaboration by one Australian university to develop a professionally integrated Financial Planning andAccounting degree and provides evidence of its impact from an industry perspective. The results reveal a highlevel of industry satisfaction with the degree, substantial professional integration, as well as the developmentof students’ professional skills. Students also developed an improved impression of the university, its studentsand its staff.

  8. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Science.gov (United States)

    2010-04-16

    ... Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian... Impact Statement (FEIS) for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake... drought management planning at the Kerr Hydroelectric Project no sooner than 30 days following the...

  9. A study of colloid-enhanced ultrafiltration. Final report, March 1984--December 1993

    Energy Technology Data Exchange (ETDEWEB)

    Scamehorn, J.F.; Christian, S.D.

    1994-02-01

    Over the past nine years of funding by DOE Office of Basic Energy Sciences, the authors have developed a whole family of methods under the umbrella of colloid-enhanced ultrafiltration techniques. These methods can be used for removal of either dissolved organics or multivalent ions from water or both simultaneously. They have gone from very fundamental studies of the ultrafiltration process to a field test using actual polluted groundwater. The orientation of this research has been the ultimate development of a workable, economical process. To do this, the authors have tried to understand the underlying fundamental phenomena involved in the separation and in potential solutions to technological bottlenecks and developed new scientific knowledge in the process. However, the thrust of the investigations have been focused on bringing the technology to a successful adoption by industry. This report summarizes the following: micellar-enhanced ultrafiltration; polyelectrolyte-enhanced ultrafiltration; ion-expulsion ultrafiltration; ligand-modified micellar-enhanced ultrafiltration; polyelectrolyte/surfactant-enhanced ultrafiltration, supporting research, and relation to energy. 61 refs.

  10. Rural Transformation and Planning Tactics in the 13th Five-Year Plan Period

    Institute of Scientific and Technical Information of China (English)

    Luo; Xiaolong; Xu; Xiao; Li; Min

    2016-01-01

    Rural development has long been the focus of China’s central and local governments. Since the late 2000 s, rural areas have presented new transformation features and development trends. To stimulate rural transformation and development in the 13 th Five-Year Plan period, this paper reviews major ideas on rural development in related disciplines. This study also summarizes main rural transformation features, including the aging population, hollow villages, changes in the allocation of land resource, semi-urbanization, and regional differences in rural development. Finally, it also provides suggestions for planning tactics in the 13 th Five-Year Plan period, such as making differentiated rural development strategies, exploring new methods to stimulate rural stock land planning and use, and enforcing relevant policy and management reforms.

  11. Rural Transformation and Planning Tactics in the 13th Five-Year Plan Period

    Institute of Scientific and Technical Information of China (English)

    Luo Xiaolong; Xu Xiao; Li Min

    2016-01-01

    Rural development has long been the focus of China's central and local governments.Since the late 2000s,rural areas have presented new transformation features and development trends.To stimulate rural transformation and development in the 13th Five-Year Plan period,this paPer reviews major ideas on rural development in related disciplines.This study also summarizes main rural transformation features,including the aging population,hollow villages,changes in the allocation of land resource,semi-urbanization,and regional differences in rural development.Finally,it also provides suggestions for planning tactics in the 13th Five-Year Plan period,such as making differentiated rural development strategies,exploring new methods to stimulate rural stock land planning and use,and enforcing relevant policy and management reforms.

  12. Plan and Some Results of "Advanced Study on Precipitation Enhancement in Arid and Semi-Arid Regions"

    Science.gov (United States)

    Murakami, M.

    2016-12-01

    There are several technologies to secure water resources, including the desalination of seawater, recycling of industrial water and reuse of wastewater. However precipitation enhancement is the only way we can create a large amount of water for industrial use, for example, water for irrigation, provided we find clouds suitable for cloud seeding and apply appropriate and effective methods to increase precipitation. Therefore, rain enhancement research is critical in the quest for new water security options and innovative solutions in the UAE and other arid and semi-arid regions. The main objective of our project is to better evaluate, and ultimately improve, the effectiveness of rain enhancement in the UAE and other arid and semi-arid regions using hygroscopic and glaciogenic seeding techniques. One of the major questions regarding rain enhancement today is the effectiveness of hygroscopic seeding for warm and supercooled convective clouds. Our research will investigate the microphysical processes in seeded and unseeded clouds using a combination of laboratory experiments, numerical simulations and in-situ aircraft measurements in order to decipher the mechanism responsible for precipitation augmentation due to hygroscopic seeding. In our research, major elements of cloud seeding, e.g., assessment of seedability, development of optimal seeding methods and evaluation of seeding effects, will be investigated in the most efficient and realistic way, within three years, using mainly the numerical models with the sophisticated seeding scheme, which is developed on a basis of laboratory experiments and then validated against in-situ and remote sensing observations. In addition to the research plan, the outcomes of the research projects, which will be made available to the public at the end of the project and benefit the broader society, is discussed.

  13. Forecast of the energy final consumption for Minas Gerais State

    International Nuclear Information System (INIS)

    Almeida, P.E.F. de; Bechtlufft, P.C.T.; Araujo, M.E.A.; Vasconcelos, E.C.; Las Casas, H.B. de; Monteiro, M.A.G.

    1990-01-01

    This paper is included among the activities of the Energy Planning of Minas Gerais State and presents a forecast of the energy final consumption for the State up to year 2010. Two Scenarios are presented involving brazilian economy's evolution, the State's demography and its sectors: residential, services, transportation, agriculture and cattle-breeding and industry. Finally, it shows two forecast on energy final consumption for Minas Gerais State. (author)

  14. Optimization of importance factors in inverse planning

    International Nuclear Information System (INIS)

    Xing, L.

    1999-01-01

    Inverse treatment planning starts with a treatment objective and obtains the solution by optimizing an objective function. The clinical objectives are usually multifaceted and potentially incompatible with one another. A set of importance factors is often incorporated in the objective function to parametrize trade-off strategies and to prioritize the dose conformality in different anatomical structures. Whereas the general formalism remains the same, different sets of importance factors characterize plans of obviously different flavour and thus critically determine the final plan. Up to now, the determination of these parameters has been a 'guessing' game based on empirical knowledge because the final dose distribution depends on the parameters in a complex and implicit way. The influence of these parameters is not known until the plan optimization is completed. In order to compromise properly the conflicting requirements of the target and sensitive structures, the parameters are usually adjusted through a trial-and-error process. In this paper, a method to estimate these parameters computationally is proposed and an iterative computer algorithm is described to determine these parameters numerically. The treatment plan selection is done in two steps. First, a set of importance factors are chosen and the corresponding beam parameters (e.g. beam profiles) are optimized under the guidance of a quadratic objective function using an iterative algorithm reported earlier. The 'optimal' plan is then evaluated by an additional scoring function. The importance factors in the objective function are accordingly adjusted to improve the ranking of the plan. For every change in the importance factors, the beam parameters need to be re-optimized. This process continues in an iterative fashion until the scoring function is saturated. The algorithm was applied to two clinical cases and the results demonstrated that it has the potential to improve significantly the existing method of

  15. SU-F-T-94: Plan2pdf - a Software Tool for Automatic Plan Report for Philips Pinnacle TPS

    Energy Technology Data Exchange (ETDEWEB)

    Wu, C [Sutter Medical Foundation, Roseville, CA (United States)

    2016-06-15

    Purpose: To implement an automatic electronic PDF plan reporting tool for Philips Pinnacle treatment planning system (TPS) Methods: An electronic treatment plan reporting software is developed by us to enable fully automatic PDF report from Pinnacle TPS to external EMR programs such as MOSAIQ. The tool is named “plan2pdf”. plan2pdf is implemented using Pinnacle scripts, Java and UNIX shell scripts, without any external program needed. plan2pdf supports full auto-mode and manual mode reporting. In full auto-mode, with a single mouse click, plan2pdf will generate a detailed Pinnacle plan report in PDF format, which includes customizable cover page, Pinnacle plan summary, orthogonal views through each plan POI and maximum dose point, DRR for each beam, serial transverse views captured throughout the dose grid at a user specified interval, DVH and scorecard windows. The final PDF report is also automatically bookmarked for each section above for convenient plan review. The final PDF report can either be saved on a user specified folder on Pinnacle, or it can be automatically exported to an EMR import folder via a user configured FTP service. In manual capture mode, plan2pdf allows users to capture any Pinnacle plan by full screen, individual window or rectangular ROI drawn on screen. Furthermore, to avoid possible patients’ plan mix-up during auto-mode reporting, a user conflict check feature is included in plan2pdf: it prompts user to wait if another patient is being exported by plan2pdf by another user. Results: plan2pdf is tested extensively and successfully at our institution consists of 5 centers, 15 dosimetrists and 10 physicists, running Pinnacle version 9.10 on Enterprise servers. Conclusion: plan2pdf provides a highly efficient, user friendly and clinical proven platform for all Philips Pinnacle users, to generate a detailed plan report in PDF format for external EMR systems.

  16. SU-F-T-94: Plan2pdf - a Software Tool for Automatic Plan Report for Philips Pinnacle TPS

    International Nuclear Information System (INIS)

    Wu, C

    2016-01-01

    Purpose: To implement an automatic electronic PDF plan reporting tool for Philips Pinnacle treatment planning system (TPS) Methods: An electronic treatment plan reporting software is developed by us to enable fully automatic PDF report from Pinnacle TPS to external EMR programs such as MOSAIQ. The tool is named “plan2pdf”. plan2pdf is implemented using Pinnacle scripts, Java and UNIX shell scripts, without any external program needed. plan2pdf supports full auto-mode and manual mode reporting. In full auto-mode, with a single mouse click, plan2pdf will generate a detailed Pinnacle plan report in PDF format, which includes customizable cover page, Pinnacle plan summary, orthogonal views through each plan POI and maximum dose point, DRR for each beam, serial transverse views captured throughout the dose grid at a user specified interval, DVH and scorecard windows. The final PDF report is also automatically bookmarked for each section above for convenient plan review. The final PDF report can either be saved on a user specified folder on Pinnacle, or it can be automatically exported to an EMR import folder via a user configured FTP service. In manual capture mode, plan2pdf allows users to capture any Pinnacle plan by full screen, individual window or rectangular ROI drawn on screen. Furthermore, to avoid possible patients’ plan mix-up during auto-mode reporting, a user conflict check feature is included in plan2pdf: it prompts user to wait if another patient is being exported by plan2pdf by another user. Results: plan2pdf is tested extensively and successfully at our institution consists of 5 centers, 15 dosimetrists and 10 physicists, running Pinnacle version 9.10 on Enterprise servers. Conclusion: plan2pdf provides a highly efficient, user friendly and clinical proven platform for all Philips Pinnacle users, to generate a detailed plan report in PDF format for external EMR systems.

  17. Quality assurance plan for Final Waste Forms project in support of the development, demonstration, testing and evaluation efforts associated with the Oak Ridge reservation's LDR/FFCA compliance

    International Nuclear Information System (INIS)

    Gilliam, T.M.; Mattus, C.H.

    1994-07-01

    This quality assurance project plan specifies the data quality objectives for Phase I of the Final Waste Forms Project and defines specific measurements and processes required to achieve those objectives. Although the project is funded by the U.S. Department of Energy (DOE), the ultimate recipient of the results is the U.S. Environmental Protection Agency (EPA). Consequently, relevant quality assurance requirements from both organizations must be met. DOE emphasizes administrative structure to ensure quality; EPA's primary focus is the reproducibility of the generated data. The ten criteria of DOE Order 5700.6C are addressed in sections of this report, while the format used is that prescribed by EPA for quality assurance project plans

  18. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2012-07-15

    In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining

  19. Implementation Authentic Task to Enhance Problem Solving and Self-Management for Physics College Students

    Science.gov (United States)

    Festiyed; Djamas, D.; Pilendia, D.

    2018-04-01

    The purpose of this study is to enhance the problem solving and self-management abilities of student teachers through individual and group authentic task. Preliminary results showed that the learning outcomes in high category, nevertheless problem solving and self-management abilities are still low and average categories (scattered at interval 40 ≤ N ≤ 65). Initiative to improve this condition is needed. Action research is the alternative solution for that condition through planning, acting, evaluating, and reflecting. This study is allowed in 4 cycles. The acting step result with integrated discuss method, case study, and presentation including self-assessment for individual and group. This method was effective to enhance problem solving and self-management abilities. The final learning outcomes seen from the correlation between student self-assessment and lecture-assessment (r=0.19). Its means there are unidirectional relationship between the result of self-assessment and lecture-assessment. The Conclusion of the research was effective to enhance problem solving and self-management ability.

  20. [Endodontically treated teeth. Success--failure. Endorestorative treatment plan].

    Science.gov (United States)

    Zabalegui, B

    1990-01-01

    More and more often the general dentist is finding the presence of endodontically treated teeth during his treatment planning procedure. He has to ask himself if the endo-treated tooth functions and will continue to function function successfully, when deciding which final endo-restorative procedure to apply. For this reason the dentist or the endodontist with whom he works should clinically evaluate these teeth, establish a diagnostic criteria of their success or failure and a treatment plan according to the prognosis. The purpose of this article is to offer an organized clinical view of the steps to follow when evaluating an endodontically treated tooth and how to establish a final endo-restorative plan.

  1. Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment

    Science.gov (United States)

    2003-09-22

    This document presents the Evaluation Teams plan for conducting the evaluation of the FOT in Washington State. A companion document exists for the evaluation of the Utah deployment. This plan includes the experimental design for testing hypotheses...

  2. Instrumentation and Control Life Cycle Management Plan Methodology. Volume 1, Manual: Final report

    International Nuclear Information System (INIS)

    Quick, D.S.; Murray, S.; Florio, F.; Bliss, M.J.

    1995-08-01

    This methodology manual describes how to develop a Life Cycle Management Plan (LCMP). An LCMP is a long-term strategic plan that can be developed for a nuclear power plant to cost-effectively maintain and upgrade its aging or obsolete Instrumentation and Control (I ampersand C) systems. An LCMP defines the utility's mission and objectives in regards to long range I ampersand C planning, as well as the plant's present configuration (I ampersand C systems, networks, man machine interfaces, etc.), its desired future I ampersand C systems, a long term I ampersand C maintenance strategy, and initial upgrade priorities and schedules to cost-effectively implement system upgrades. This manual is accompanied by a workbook (EPRI TR-105555-V2) which contains various worksheets, outlines, and generic interview questions that aid in the LCNW development process

  3. Strategic marketing planning and the Nigerian banking industry ...

    African Journals Online (AJOL)

    Strategic marketing planning and the Nigerian banking industry. ... However, banks often have problem of formulating good marketing strategy plan that will enhance the bank general performance. ... EMAIL FULL TEXT EMAIL FULL TEXT

  4. [Application of digital design of orthodontic-prosthodontic multidisciplinary treatment plan in esthetic rehabilitation of anterior teeth].

    Science.gov (United States)

    Liu, Y S; Li, Z; Zhao, Y J; Ye, H Q; Zhou, Y Q; Hu, W J; Liu, Y S; Xun, C L; Zhou, Y S

    2018-02-18

    To develop a digital workflow of orthodontic-prosthodontic multidisciplinary treatment plan which can be applied in complicated anterior teeth esthetic rehabilitation, in order to enhance the efficiency of communication between dentists and patients, and improve the predictability of treatment outcome. Twenty patients with the potential needs of orthodontic-prosthodontic multidisciplinary treatment to solve their complicated esthetic problems in anterior teeth were recruited in this study. Digital models of patients' both dental arches and soft tissues were captured using intra oral scanner. Direct prosthodontic (DP) treatment plan and orthodontic-prosthodontic (OP) treatment plan were carried out for each patient. For DP treatment plans, digital wax-up models were directly designed on original digital models using prosthodontic design system. For OP treatment plans, virtual-setups were performed using orthodontic analyze system according to orthodontic and esthetic criteria and imported to prosthodontic design system to finalize the digital wax-up models. These two treatment plans were shown to the patients and demonstrated elaborately. Each patient rated two treatment plans using visual analogue scales and the medians of scores of two treatment plans were analyzed using signed Wilcoxon test. Having taken into consideration various related factors, including time, costs of treatment, each patient chose a specific treatment plan. For the patients chose DP treatment plans, digital wax-up models were exported and printed into resin diagnostic models which would be utilized in the prosthodontic treatment process. For the patients chose OP treatment plans, virtual-setups were used to fabricate aligners or indirect bonding templates and digital wax-up models were also exported and printed into resin diagnostic models for prosthodontic treatment after orthodontic treatment completed. The medians of scores of DP treatment plan and OP treatment plan were calculated and

  5. Optimal partial-arcs in VMAT treatment planning

    International Nuclear Information System (INIS)

    Wala, Jeremiah; Salari, Ehsan; Chen Wei; Craft, David

    2012-01-01

    We present a method for improving the delivery efficiency of VMAT by extending the recently published VMAT treatment planning algorithm vmerge to automatically generate optimal partial-arc plans. A high-quality initial plan is created by solving a convex multicriteria optimization problem using 180 equi-spaced beams. This initial plan is used to form a set of dose constraints, and a set of partial-arc plans is created by searching the space of all possible partial-arc plans that satisfy these constraints. For each partial-arc, an iterative fluence map merging and sequencing algorithm (vmerge) is used to improve the delivery efficiency. Merging continues as long as the dose quality is maintained above a user-defined threshold. The final plan is selected as the partial-arc with the lowest treatment time. The complete algorithm is called pmerge. Partial-arc plans are created using pmerge for a lung, liver and prostate case, with final treatment times of 127, 245 and 147 s. Treatment times using full arcs with vmerge are 211, 357 and 178 s. The mean doses to the critical structures for the vmerge and pmerge plans are kept within 5% of those in the initial plan, and the target volume covered by the prescription isodose is maintained above 98% for the pmerge and vmerge plans. Additionally, we find that the angular distribution of fluence in the initial plans is predictive of the start and end angles of the optimal partial-arc. We conclude that VMAT delivery efficiency can be improved by employing partial-arcs without compromising dose quality, and that partial-arcs are most applicable to cases with non-centralized targets. (paper)

  6. ENTERPRISE RESOURCE STRATEGIC PLANNING: TARGET CHOICE TECHNIQUES

    Directory of Open Access Journals (Sweden)

    A. S. Lankin

    2011-01-01

    Full Text Available Choice of the targets is one of most important elements of the resource planning system. Particular feature of the strategic planning is development of future alternatives for the enterprise. Main resource strategic planning cycle elements: examination of principal external and internal environment components; forming the company mission; development of long-term targets; concretization of the long-term targets through short-term aims; examination of strategies and final choice.

  7. Analysis of The Planning Education in the Light of the Contemporary Trends in Planning

    Science.gov (United States)

    Husar, Milan; Ceren Varis, Sila; Ondrejicka, Vladimir

    2017-12-01

    This paper examines the way the planning education is taught and examines the recent trends in the curricula of planning education institutions. The introduction of changing economic systems and planning in the field of education is discussed against these changes. Additionally, the evolution in the planner’s role and how it affects the planning education is discussed. The paper is addressing trends and challenges the countries and their planning changes are facing in 21st century. The trends such as increasing globalization, fuzziness of spatial structures and their borders, complexity and uncertainty and the growing interconnectedness of the world are discussed. Another aim is to prepare a common ground, a platform at the university level for scientific cooperation in the field of planning. This study aims at examining the situation of planning in the contemporary world. The identified challenges include the need for more flexibility in planning and planning education, the emergence of innovations and creativity in planners and planning projects, the necessity of promoting soft skills while keeping the existing technical nature of planning and lastly, the need for more interdisciplinary work. The final part of the paper is discussing the future planning education and recommendations on how the schools of planning should reflect these changes.

  8. New model of enterprises resource planning implementation planning process in manufacturing enterprises

    Directory of Open Access Journals (Sweden)

    Mirjana Misita

    2016-05-01

    Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”

  9. Marketing Plan for a Case company

    OpenAIRE

    Iadykina, Anastasiia; Pavlidi, Kiriaki

    2015-01-01

    The major objective of this thesis is composing a concise, reliable and useful marketing plan for a Phimiso - My Sushi Café. The necessity of implementing the marketing planning and document a marketing plan with an action program arose when the case company experienced the negative affect of poor concept with misleading message and way too wide expansion of the menu. All of the above lead to outflow of the customers and stagnancy of the company. The final document covers the traditi...

  10. Decommissioning Plan for European Spallation Source

    Directory of Open Access Journals (Sweden)

    Ene Daniela

    2017-01-01

    Full Text Available This paper is a survey of the European Spallation Source initial decommissioning plan developed in compliance with Swedish Regulatory Authority requirements. The report outlines the decommissioning strategy selected and the baseline plan for decommissioning. Types and quantities of radioactive waste estimated to be generated at the final shut-down of the facility are further provided. The paper ends up with the analysis of the key elements of the decommissioning plan and the recommendations to the ESS management team..

  11. Tools for Supporting Distributed Agile Project Planning

    Science.gov (United States)

    Wang, Xin; Maurer, Frank; Morgan, Robert; Oliveira, Josyleuda

    Agile project planning plays an important part in agile software development. In distributed settings, project planning is severely impacted by the lack of face-to-face communication and the inability to share paper index cards amongst all meeting participants. To address these issues, several distributed agile planning tools were developed. The tools vary in features, functions and running platforms. In this chapter, we first summarize the requirements for distributed agile planning. Then we give an overview on existing agile planning tools. We also evaluate existing tools based on tool requirements. Finally, we present some practical advices for both designers and users of distributed agile planning tools.

  12. Transfer from planned home birth to hospital: improving interprofessional collaboration.

    Science.gov (United States)

    Vedam, Saraswathi; Leeman, Lawrence; Cheyney, Melissa; Fisher, Timothy J; Myers, Susan; Low, Lisa Kane; Ruhl, Catherine

    2014-01-01

    Women's heightened interest in choice of birthplace and increased rates of planned home birth in the United States have been well documented, yet there remains significant public and professional debate about the ethics of planned home birth in jurisdictions where care is not clearly integrated across birth settings. Simultaneously, the quality of interprofessional interactions is recognized as a predictor of health outcomes during obstetric events. When care is transferred across birth settings, confusion and conflict among providers with respect to roles and responsibilities can adversely affect both outcomes and the experience of care for women and newborns. This article reviews findings of recent North American studies that examine provider attitudes toward planned home birth, differing concepts of safety of birthplace as reported by women and providers, and sources of conflict among maternity care providers during transfer from home to hospital. Emerging evidence and clinical exemplars can inform the development of systems for seamless transfer of women and newborns from planned home births to hospital and improve experience and perceptions of safety among families and providers. Three successful models in the United States that have enhanced multidisciplinary cooperation and coordination of care across birth settings are described. Finally, best practice guidelines for roles, communication, and mutual accommodation among all participating providers when transfer occurs are introduced. Research, health professional education, and policy recommendations for incorporation of key components into existing health care systems in the United States are included. © 2014 by the American College of Nurse-Midwives.

  13. Spatial planning for sustainable rural municipalities

    OpenAIRE

    Thellbro, Camilla

    2017-01-01

    Local natural resources (LNRs) are essential for the socioeconomy of rural societies. The United Nations (UN) Agenda 21 and “Our Common Future” state that local spatial planning is central for the prospect of balancing ecological, social and economic sustainable development (SuD). Stakeholder participation in spatial planning enhances acceptance and improves preconditions for successful planning outcomes. Consequently, it is important to increase knowledge about LNRs and the use of them and t...

  14. A better-response strategy for self-interested planning agents

    NARCIS (Netherlands)

    Jordan Prunera, J.M.; Torreño, Alejandro; de Weerdt, M.M.; Onaindia, Eva

    2018-01-01

    When self-interested agents plan individually, interactions that prevent them from executing their actions as planned may arise. In these coordination problems, game-theoretic planning can be used to enhance the agents’ strategic behavior considering the interactions as part of the agents’

  15. Learning Through Scenario Planning

    DEFF Research Database (Denmark)

    Balarezo, Jose

    level variables, this research corrects this void by investigating the dynamics of organizational learning through the lenses of a corporate scenario planning process. This enhances our scientific understanding of the role that scenario planning might play in the context of organizational learning......This project investigates the uses and effects of scenario planning in companies operating in highly uncertain and dynamic environments. Whereas previous research on scenario planning has fallen short of providing sufficient evidence of its mechanisms and effects on individual or organizational...... and strategic renewal. Empirical evidence of the various difficulties that learning flows has to overcome as it journeys through organizational and hierarchical levels are presented. Despite various cognitive and social psychological barriers identified along the way, the results show the novel...

  16. Enhancement of a model for Large-scale Airline Network Planning Problems

    NARCIS (Netherlands)

    Kölker, K.; Lopes dos Santos, Bruno F.; Lütjens, K.

    2016-01-01

    The main focus of this study is to solve the network planning problem based on passenger decision criteria including the preferred departure time and travel time for a real-sized airline network. For this purpose, a model of the integrated network planning problem is formulated including scheduling

  17. Rapid Diagnosis of IHN Virus Infection in Salmon and Steelhead Trout, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Leong, JoAnn Ching

    1984-12-01

    The main objective for this study was the development of a rapid diagnostic method for IHN virus in fish tissue samples. The rationale for developing new techniques for diagnosing IHNV infection was that present methods were time consuming and dependent on virus neutralization by specific antisera, a reagent that was not readily available or reliable. Fish pathologists required a rapid detection method which was sensitive enough to detect virus strain differences so that they could provide data for effective management decisions in controlling the spread of IHNV. Bonneville Power Administration's (BPA) role in efforts in fish diseases and more generically the protection, mitigation, and enhancement of Columbia River salmon and steelhead populations, is mandated by Congress through the Pacific Northwest Electric Power Planning and Conservation Act (Regional Act), Pub. L. 96-501. Section 4 (h) of the Regional Act directs the Northwest Power Planning Council to develop a Fish and Wildlife Program. BPA's Administrator is authorized in Section 4 (h) (10) (A) to ''use funds and the authorities available to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries''. The fund is to be used to implement measures that are consistent with the Council's Fish and Wildlife Program. The research detailed in this final report is consistent with these objectives. This final report has been prepared as part of BPA's policy to encourage the preservation and dissemination of research results by publication in scientific journals.

  18. Impact of cone-beam computed tomography on implant planning and on prediction of implant size

    International Nuclear Information System (INIS)

    Pedroso, Ludmila Assuncao de Mello; Silva, Maria Alves Garcia Santos; Garcia, Robson Rodrigues; Leles, Jose Luiz Rodrigues; Leles, Claudio Rodrigues

    2013-01-01

    The aim was to investigate the impact of cone-beam computed tomography (CBCT) on implant planning and on prediction of final implant size. Consecutive patients referred for implant treatment were submitted to clinical examination, panoramic (PAN) radiography and a CBCT exam. Initial planning of implant length and width was assessed based on clinical and PAN exams, and final planning, on CBCT exam to complement diagnosis. The actual dimensions of the implants placed during surgery were compared with those obtained during initial and final planning, using the McNemmar test (p 0.05). It was concluded that CBCT improves the ability of predicting the actual implant length and reduces inaccuracy in surgical dental implant planning. (author)

  19. Systemic Operational Design: Enhancing the Joint Operation Planning Process

    National Research Council Canada - National Science Library

    Delacruz, Victor J

    2007-01-01

    Operational level commanders and their staffs require relevant and current joint doctrine that articulates the critical function of operational design and its role in the Joint Operation Planning Process (JOPP...

  20. GRoW Buffalo Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Bohm, Martha [Univ. at Buffalo, NY (United States)

    2016-04-17

    This document provides final reporting on the GRoW Home, University at Buffalo's entry to the 2015 Solar Decathlon competition in Irvine, CA. The report summarizes fundraising efforts, documents media outreach, lists online presence, analyzes the organizer's communication, describes post-competition life of the house and future employment plans for student team members. Last, it suggests improvements for future decathlons.

  1. Treatment planning considerations in contrast-enhanced radiotherapy: energy and beam aperture optimization

    Energy Technology Data Exchange (ETDEWEB)

    Garnica-Garza, H M, E-mail: hgarnica@cinvestav.mx [Centro de Investigacion y de Estudios Avanzados del Instituto Politecnico Nacional Unidad Monterrey, Via del Conocimiento 201 Parque de Investigacion e Innovacion Tecnologica, Apodaca NL CP 66600 (Mexico)

    2011-01-21

    It has been shown that the use of kilovoltage x-rays in conjunction with a contrast agent incorporated into the tumor can lead to acceptable treatment plans with regard to the absorbed dose distribution produced in the target as well as in the tissue and organs at risk surrounding it. In this work, several key aspects related to the technology and irradiation techniques necessary to clinically implement this treatment modality are addressed by means of Monte Carlo simulation. The Zubal phantom was used to model a prostate radiotherapy treatment, a challenging site due to the depth of the prostate and the presence of bony structures that must be traversed by the x-ray beam on its way to the target. It is assumed that the concentration levels of the enhancing agent present in the tumor are at or below 10 mg per 1 g of tissue. The Monte Carlo code PENELOPE was used to model a commercial x-ray tube having a tungsten target. X-ray energy spectra for several combinations of peak electron energy and added filtration were obtained. For each energy spectrum, a treatment plan was calculated, with the PENELOPE Monte Carlo code, by modeling the irradiation of the patient as 72 independent conformal beams distributed at intervals of 5{sup 0} around the phantom in order to model a full x-ray source rotation. The Cimmino optimization algorithm was then used to find the optimum beam weight and energy for different treatment strategies. It is shown that for a target dose prescription of 72 Gy covering the whole tumor, the maximum rectal wall and bladder doses are kept below 52 Gy for the largest concentration of contrast agent of 10 mg per 1 g of tissue. It is also shown that concentrations of as little as 5 mg per 1 g of tissue also render dose distributions with excellent sparing of the organs at risk. A treatment strategy to address the presence of non-uniform distributions of the contrast agent in the target is also modeled and discussed.

  2. Project gnome decontamination and decommissioning plan

    International Nuclear Information System (INIS)

    1979-04-01

    The document presents the operational plan for conducting the final decontamination and decommissioning work at the site of the first U.S. nuclear detonation designed specifically for peaceful purposes and the first underground event on the Plowshare Program to take place outside the Nevada Test Site. The plan includes decontamination and decommissioning procedures, radiological guidelines, and the NV concept of operations

  3. Watsonville Sloughs watershed resource conservation and enhancement plan

    Data.gov (United States)

    Department of the Interior — This document identifies feasible projects that address the long-term protection and enhancement of the Watsonville Sloughs system’s ecological values and the needs...

  4. MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases

    International Nuclear Information System (INIS)

    Chang, J.

    2015-01-01

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  5. MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases

    Energy Technology Data Exchange (ETDEWEB)

    Chang, J. [New York Weill Cornell Medical Ctr (United States)

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  6. Research on test of alkali-resistant glass fibre enhanced seawater coral aggregate concrete

    Science.gov (United States)

    Liu, Leiyang; Wang, Xingquan

    2017-12-01

    It is proposed in the 13th five-year plan that reefs of the south China sea should be constructed. In the paper, an innovative thinking was proposed for the first time in order to realize local material acquisition in island construction and life dependence on sea, namely alkali-resistant glass fibre is mixed in coralaggregate concrete as reinforcing material. The glass fibre is characterized by low price, low hardness, good dispersibility and convenient construction. Reliable guarantee is provided for widely applying the material in future projects. In the paper, an orthogonal test method is firstly applied to determine the mix proportion of grade C50 coral aggregate concrete. Then, the design plan ofmix proportion of alkali-resistant glass fibre enhanced seawater coral aggregate concrete is determined. Finally, the influence law of alkali-resistant glass fibre dosageon tensile compressiveflexture strength of seawatercoralaggregate concrete is made clear.

  7. 40 CFR 52.1190 - Original Identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original Identification of plan section... Original Identification of plan section. (a) This section identifies the original “Air Implementation Plan... Stipulation for Entry of Consent Order and Final Order, No. 8-1982. The original Consent Order No. 8-1982 was...

  8. Enhancing Communication in an Egyptian Research Centre

    International Nuclear Information System (INIS)

    Morsy, S.W.

    2013-01-01

    This paper is a proposed attempt to enhance communication in a research centre in Egypt. The currently Nuclear and Radiological Regulatory Authority (NRRA) which formerly was the National Centre for Nuclear Safety and Radiation Control (NCNSRC) is housed in a nine-storey building with a straight double loaded corridor architectural plan. Syntactic axial analysis showed high integration for each floor plan individually which means that the floor plan is not to be blamed for lack of communication among floor inhabitants; other means must be attempted. But global axial integration (for the whole building) proved to be poor. A problem of communication among floors was identified. Means for enhancing communication were introduced: The lecture hall, the cafe and meeting rooms can play an important role in enhancing global communication among NRRA inhabitants. Besides a questionnaire was designed and distributed on all inhabitants and its feedback came up with ideas which if implemented could result in enhancing the level of communication between the inhabitants of the building thus overcoming spatial hindrances.

  9. Planning, design and implementation of the enhancing child ...

    African Journals Online (AJOL)

    African Journal of Food, Agriculture, Nutrition and Development ... The Enhancing Child Nutrition through Animal Source Management (ENAM) project ... community development, research and capacity building initiative with the goal of ...

  10. The Effects of Pre-Task Planning and On-line Planning on Fluency, Complexity, and Accuracy in L2 Monologic Oral Production.

    Science.gov (United States)

    Yuan, Fangyuan; Ellis, Rod

    2003-01-01

    Investigated the effects of both pre-task and on-line planning on second language (L2) oral production. Results show that pre-task planning enhances grammatical complexity while on-line planning positively influences accuracy and grammatical complexity. Pre-task planners also produced more fluent and lexically varied language than the on-line…

  11. Quality assurance plan for Final Waste Forms project in support of the development, demonstration, testing and evaluation efforts associated with the Oak Ridge reservation`s LDR/FFCA compliance

    Energy Technology Data Exchange (ETDEWEB)

    Gilliam, T.M.; Mattus, C.H.

    1994-07-01

    This quality assurance project plan specifies the data quality objectives for Phase I of the Final Waste Forms Project and defines specific measurements and processes required to achieve those objectives. Although the project is funded by the U.S. Department of Energy (DOE), the ultimate recipient of the results is the U.S. Environmental Protection Agency (EPA). Consequently, relevant quality assurance requirements from both organizations must be met. DOE emphasizes administrative structure to ensure quality; EPA`s primary focus is the reproducibility of the generated data. The ten criteria of DOE Order 5700.6C are addressed in sections of this report, while the format used is that prescribed by EPA for quality assurance project plans.

  12. Report of the Long-Range Planning Committee

    International Nuclear Information System (INIS)

    1984-01-01

    This is the final report of the Long-Range Planning Committee of the Lawrence Livermore National Laboratory. It describes the make-up, purpose, working assumptions, and activities of the Committee and discusses the work done by the Committee on defense matters, energy, a number of additional topics, and future long-range planning activities

  13. Development of State Plan for Career Education in Alabama. Final Report.

    Science.gov (United States)

    Alabama State Dept. of Education, Montgomery.

    This state plan for career education in Alabama describes the first-year objectives and operational procedures of the State Advisory Council for Career Education. Activities of the following six task forces are reported: (1) needs assessment for grades K-12, (2) postsecondary needs assessment, (3) noneducational (business and industry) needs…

  14. Long term planning for wind energy development

    International Nuclear Information System (INIS)

    Trinick, M.

    1995-01-01

    In a planning system intended to be governed primarily by policies in statutory plans a reasonable horizon for long term planning is 10 years or longer. Because of statutory requirements, developers have no option but to pay due regard to, and take a full part in, long term planning. The paper examines the type of policies which have emerged in the last few years to cater for wind energy development. It canvasses the merits of different types of policies. Finally, it discusses the policy framework which may emerge to cater for development outside NFFO. (Author)

  15. Tank 241-AZ-102 Privatization Push Mode Core Sampling and Analysis Plan; FINAL

    International Nuclear Information System (INIS)

    TEMPLETON, A.M.

    1999-01-01

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AZ-102. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AZ-102. Push mode core samples will be obtained from risers 15C and 24A to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples, composite the liquids and solids, perform chemical analyses, and provide subsamples to the Process Chemistry Laboratory. The Process Chemistry Laboratory will prepare test plans and perform process tests to evaluate the behavior of the 241-AZ-102 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. Requirements for analyses of samples originating in the process tests will be documented in the corresponding test plan

  16. Tourism Planning and Tourismphobia: An Analysis of the Strategic Tourism Plan of Barcelona 2010-2015

    Directory of Open Access Journals (Sweden)

    Marco Martins

    2018-05-01

    Full Text Available The exponential growth of tourism has brought new challenges to destinations; how to plan themselves to avoid overtourism and this new form of intolerance, the so-called tourismphobia. In order to address the negative impacts of tourism and enhance the positive ones Barcelona has developed and implemented a strategic tourism plan. This paper seeks to understand how Barcelona addressed the tourismphobia problematic through planning: how it was done and which results were achieved in the end. This research reveals a clear gap between the planner’s intention and the plan’s implementation.

  17. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    mistake sometimes made in the site characterization process is failure to use technically sound available data to form working hypotheses on hydrogeology, contaminant distribution, etc. for initial testing. (3) After assembling and interpreting existing data for the site, the entire technical team visits the site to identify as a group the site characteristics that might prohibit or enhance any particular technological approach. Logistic and community constraints are also identified at this point. (4) After the field visit, the team selects a suite of technologies appropriate to the problem and completes the design of the field program. No one technique works well at all sites, and a suite of techniques is necessary to delineate site features fully. In addition, multiple technologies are employed to increase confidence in conclusions about site features. Noninvasive and minimally invasive technologies are emphasized to minimize risk to the environment, the community, and the staff. In no case is the traditional approach of installing a massive number of monitoring wells followed. A dynamic work plan that outlines the program is produced for the sponsoring and regulatory agencies. The word ''dynamic'' is emphasized because the work plan is viewed as a guide, subject to modification, for the site characterization activity, rather than a document that is absolute and unchangeable. Therefore, the health and safety plan and the quality assurance/quality control plan must be broad and encompass all possible alterations to the plan. The cooperation of the regulating agency is essential in successful implementation of this process. The sponsoring and regulatory agencies are notified if significant changes to the site-specific work plan are necessary. (5) The entire team participates in the technical field program. Several technical activities are undertaken simultaneously. These may range from different surface geophysics investigations to vegetation sampling

  18. Enhancing Survivorship Care Planning for Patients With Localized Prostate Cancer Using a Couple-Focused mHealth Symptom Self-Management Program: Protocol for a Feasibility Study.

    Science.gov (United States)

    Song, Lixin; Dunlap, Kaitlyn L; Tan, Xianming; Chen, Ronald C; Nielsen, Matthew E; Rabenberg, Rebecca L; Asafu-Adjei, Josephine K; Koontz, Bridget F; Birken, Sarah A; Northouse, Laurel L; Mayer, Deborah K

    2018-02-26

    This project explores a new model of care that enhances survivorship care planning and promotes health for men with localized prostate cancer transitioning to posttreatment self-management. Survivorship care planning is important for patients with prostate cancer because of its high incidence rate in the United States, the frequent occurrence of treatment-related side effects, and reduced quality of life (QOL) for both men and their partners. A key component of comprehensive survivorship care planning is survivorship care plans (SCPs), documents that summarize cancer diagnosis, treatment, and plans for follow-up care. However, research concerning the effectiveness of SCPs on patient outcomes or health service use has thus far been inconclusive. SCPs that are tailored to individual patients' needs for information and care may improve effectiveness. This study aims to examine the feasibility of an enhanced survivorship care plan (ESCP) that integrates a symptom self-management mHealth program called Prostate Cancer Education and Resources for Couples (PERC) into the existing standardized SCP. The specific aims are to (1) examine the feasibility of delivering ESCPs and (2) to estimate the magnitude of benefit of ESCPs. We will use a two-group randomized controlled pretest-posttest design and collect data at baseline (T1) and 4 months later (T2) among 50 patients completing initial treatment for localized prostate cancer and their partners. First, we will assess the feasibility of ESCP by recruitment, enrollment, and retention rates; program satisfaction with the ESCP; and perceived ease of use of the ESCP. To achieve the secondary aim, we will compare the ESCP users with the standardized SCP users and assess their primary outcomes of QOL (overall, physical, emotional, and social QOL); secondary outcomes (reduction in negative appraisals and improvement in self-efficacy, social support, and health behaviors to manage symptoms); and number of visits to posttreatment

  19. Revised GCFR safety program plan

    International Nuclear Information System (INIS)

    Kelley, A.P.; Boyack, B.E.; Torri, A.

    1980-05-01

    This paper presents a summary of the recently revised gas-cooled fast breeder reactor (GCFR) safety program plan. The activities under this plan are organized to support six lines of protection (LOPs) for protection of the public from postulated GCFR accidents. Each LOP provides an independent, sequential, quantifiable risk barrier between the public and the radiological hazards associated with postulated GCFR accidents. To implement a quantitative risk-based approach in identifying the important technology requirements for each LOP, frequency and consequence-limiting goals are allocated to each. To ensure that all necessary tasks are covered to achieve these goals, the program plan is broken into a work breakdown structure (WBS). Finally, the means by which the plan is being implemented are discussed

  20. The Austrian Space Plan

    Science.gov (United States)

    Pseiner, K.; Balogh, W.

    2002-01-01

    After several years of preparation and discussion among the involved players, the Austrian Space Plan was approved for implementation in November 2001. Based on careful benchmarking and analysis of the capabilities of the Austrian space sector it aims to create excellent conditions for the sector's further development. The new space strategy embraces Austria's participation in the mandatory and optional programmes of the European Space Agency and establishes a National Space Programme supported by separate funding opportunities. A set of clearly-defined indicators ensures that the progress in implementing the Space Plan can be objectively judged through independent, annual reviews. The National Space Programme promotes international cooperation in space research and space activities with the aim to strengthen the role of space science and to better prepare Austrian space industry for the commercial space market. In the framework of the Space Plan the Austrian Space Agency has been tasked with integrating the industry's growing involvement in aeronautics activities to better utilize synergies with the space sector. This paper reviews the various steps leading to the approval of the new space strategy and discusses the hurdles mastered in this process. It reports on the Space Plan's first results, specifically taking into account projects involving international cooperation. For the first the Austria aerospace-sector can rely on an integrated strategy for aeronautics- and space activities which is firmly rooted in the efforts to enhance the country's R&D activities. It may also act as a useful example for other small space- using countries planning to enhance their involvement in space activities.

  1. Model Watershed Plan; Lemhi, Pahsimeroi, and East Fork of the Salmon River Management Plan, 1995 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Swift, Ralph

    1995-11-01

    Idaho`s Model Watershed Project was established as part of the Northwest Power Planning Council`s plan for salmon recovery in the Columbia River Basin. The Council`s charge was simply stated and came without strings. The tasks were to identify actions within the watershed that are planned or needed for salmon habitat, and establish a procedure for implementing habitat-improvement measures. The Council gave the responsibility of developing this project to the Idaho Soil Conservation Commission. This Model Watershed Plan is intended to be a dynamic plan that helps address these two tasks. It is not intended to be the final say on either. It is also not meant to establish laws, policies, or regulations for the agencies, groups, or individuals who participated in the plan development.

  2. Closure Plan for Active Low Level Burial Grounds

    Energy Technology Data Exchange (ETDEWEB)

    SKELLY, W.A.

    2000-11-16

    This plan has been prepared in response to direction from the U.S. Department of Energy. The purpose of the plan is to define approaches that will be implemented to ensure protection of the public and the environment when active Low-Level Burial Grounds (LLBGs) at the Hanford Site are closed. Performance assessments for active burial grounds in the 200 East and West 200 Areas provide current estimates of potential environmental contamination and doses to the ''maximum exposed individual'' from burial ground operation and closure and compare dose estimates to performance objective dose limits for the facilities. This is an Operational Closure Plan. The intent of the guidance in DOE Order 435.1 is that this plan will be a living document, like the facility performance assessments, and will be revised periodically through the operational life of the LLBGs to reflect updated information on waste inventory. management practices, facility transition planning, schedule dates, assessments of post-closure performance, and environmental consequences. Out year dates identified in this plan are tentative. A Final Closure Plan will be prepared in the future when the timing and extent of closure-related activities for LLBGs can be established with greater certainty. After current operations at the LLBGs are concluded, this plan proposes transitioning of these facilities to the Environmental Restoration Program. This action will enable the Environmental Restoration Program to design and implement consistent and coordinated final remedial actions for active and inactive LLBGs. Active and inactive burial grounds in the 200 West and 200 East Areas are commingled. This plan describes approaches that will be implemented during Interim Closure, Final Closure, and Institutional Control Periods to prepare LLBGs for surface barriers, and the construction of barriers, as well as the scope of inspection, monitoring and maintenance practices that will be performed during

  3. Recovery, restoration, and development of an enhancement plan for the Leading Creek watershed after dewatering of the Meigs number-sign 31 coal mine in Ohio

    International Nuclear Information System (INIS)

    Cherry, D.S.; Hassel, J.H. Van; Yeager, M.M.; Babendreier, J.E.; Currie, R.J.; Astin, L.E.; Lynde, S.R.

    1995-01-01

    Following the flooding of the Meigs number-sign 31 deep coal mine in Meigs County, Ohio, a proactive plan was developed to evaluate effects of initial dewatering, recovery, and development of a watershed enhancement plan. Approximately half of the 31-mile Leading Creek mainstem received coal mine discharge of high conductivity, low pH, high metals and total suspended solids loading. Most forms of aquatic life were depleted in the impacted areas of the creek. After three years since the incident, many forms of benthic macroinvertebrates and fish have returned to the creek, and sediments have been purged of metal loading by storm water events. The enhancement plan involves a reconnaissance of the creek and tributaries pinpointing areas of agricultural sedimentation and abandoned mined land (AML) influences in the lower half. Research activities involved sampling water and sediment in 10 stations of the creek and 17 major tributaries. The tributaries were addressed as point source discharges with water/sediment toxicity testing conducted. In-situ testing included growth impairment evaluation of Asian clams at 27 stations in the watershed. Several tributaries were intermittently toxic depending upon rainfall and the degree of AML input. Benthic macroinvertebrate assembles in most tributaries were stressed and comprised 0--3 taxa. Erosion/sedimentation loading was being addressed by hydrological modeling of the creek, land use management/habitat assessment, and data management by geographic information systems

  4. Safety case plan 2008

    International Nuclear Information System (INIS)

    2008-07-01

    Following the guidelines set forth by the Ministry of Trade and Industry (now Ministry of Employment and Economy) Posiva is preparing to submit the construction license application for a spent fuel repository by the end of the year 2012. The long-term safety section supporting the license application is based on a safety case, which, according to the internationally adopted definition, is a compilation of the evidence, analyses and arguments that quantify and substantiate the safety and the level of expert confidence in the safety of the planned repository. In 2005, Posiva presented a plan to prepare such a safety case. The present report provides a revised plan of the safety case contents mentioned above. The update of the safety case plan takes into account the recommendations made by the Radiation and Nuclear Safety Authority (STUK) about improving the focus and further developing the plan. Accordingly, particular attention is given to the quality management of the safety case work, the management of uncertainties and the scenario methodology. The quality management is based on the ISO 9001:2000 standard process thinking enhanced with special features arising from STUK's YVL Guides. The safety case production process is divided into four main sub-processes. The conceptualisation and methodology sub-process defines the framework for the assessment. The critical data handling and modelling sub-process links Posiva's main technical and scientific activities to the production of the safety case. The assessment sub-process analyses the consequences of the evolution of the disposal system in various scenarios, classified either as part of the expected evolution or as disruptive scenarios. The compliance and confidence sub-process is responsible for final evaluation of compliance of the assessment results with the regulatory criteria and the overall confidence in the safety case. As in the previous safety case plan, the safety case will be based on several reports, but

  5. MO-B-BRB-03: Systems Engineering Tools for Treatment Planning Process Optimization in Radiation Medicine

    International Nuclear Information System (INIS)

    Kapur, A.

    2015-01-01

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  6. MO-B-BRB-03: Systems Engineering Tools for Treatment Planning Process Optimization in Radiation Medicine

    Energy Technology Data Exchange (ETDEWEB)

    Kapur, A. [Long Island Jewish Medical Center (United States)

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  7. Determining Coastal Hazards Risk Perception to Enhance Local Mitigation Planning through a Participatory Mapping Approach

    Science.gov (United States)

    Bethel, M.; Braud, D.; Lambeth, T.; Biber, P.; Wu, W.

    2017-12-01

    Coastal community leaders, government officials, and natural resource managers must be able to accurately assess and predict a given coastal landscape's sustainability and/or vulnerability as coastal habitat continues to undergo rapid and dramatic changes associated with natural and anthropogenic activities such as accelerated relative sea level rise (SLR). To help address this information need, a multi-disciplinary project team conducted Sea Grant sponsored research in Louisiana and Mississippi with traditional ecosystem users and natural resource managers to determine a method for producing localized vulnerability and sustainability maps for projected SLR and storm surge impacts, and determine how and whether the results of such an approach can provide more useful information to enhance hazard mitigation planning. The goals of the project are to develop and refine SLR visualization tools for local implementation in areas experiencing subsidence and erosion, and discover the different ways stakeholder groups evaluate risk and plan mitigation strategies associated with projected SLR and storm surge. Results from physical information derived from data and modeling of subsidence, erosion, engineered restoration and coastal protection features, historical land loss, and future land projections under SLR are integrated with complimentary traditional ecological knowledge (TEK) offered by the collaborating local ecosystem users for these assessments. The data analysis involves interviewing stakeholders, coding the interviews for themes, and then converting the themes into vulnerability and sustainability factors. Each factor is weighted according to emphasis by the TEK experts and number of experts who mention it to determine which factors are the highest priority. The priority factors are then mapped with emphasis on the perception of contributing to local community vulnerability or sustainability to SLR and storm surge. The maps are used by the collaborators to benefit

  8. Enhancing sediment flux control and natural hazard risk mitigation through a structured conceptual planning approach

    Science.gov (United States)

    Simoni, S.; Vignoli, G.; Mazzorana, B.

    2017-08-01

    Sediment fluxes from mountain rivers contribute to shape the geomorphologic features of lowland rivers and to establish the physical basis for an optimal set of ecosystem functions and related services to people. Through significant public funding, the hydro-morphological regimes of mountain rivers in the European Alps have been progressively altered over the last century, with the aim to provide a safe dwelling space, to boost transport, mobility and to support economic growth. We claim that the underlying planning weaknesses contribute to determine these inefficient resource allocations, since flood risk is still high and the ecosystem services are far from being optimal. Hence, with the overall aim to enhance sediment flux control and hazard risk mitigation in such heavily modified alpine streams, we propose a structured design workflow which guides the planner through system analysis and synthesis. As a first step the proposed workflow sets the relevant planning goals and assesses the protection structure functionality. Then a methodology is proposed to achieve the goals. This methodology consists in characterising the hydrologic basin of interest and the sediment availability and determining the sediment connectivity to channels. The focus is set on the detailed analysis of existing river cross sections where the sediment continuity is interrupted (e.g. slit and check dams). By retaining relevant sediment volumes these structures prevent the reactivation of hydro-morphological and associated ecological functionalities. Since their actual performance can be unsatisfying with respect to flood risk mitigation (e.g. mainly old structures), we introduce specific efficiency indicators as a support for the conceptual design stage to quantify effects related to sediment flux control and risk management. The proposed planning approach is then applied to the Gadria system (stream, slit dam, retention basin and culvert), located in South Tyrol, Italy. This case study

  9. Project Gasbuggy well plugging and site restoration plan

    International Nuclear Information System (INIS)

    1978-07-01

    The operational plan for conducting the final restoration work at the site of the first U.S. underground nuclear experiment for the stimulation of low-productivity natural gas reservoirs is given. The plan includes well plugging procedures, surface facilities decontamination and removal procedures, radiological guidelines, and environmental considerations

  10. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  11. A Multi-Year Plan for Enhancing Turbulence Modeling in Hydra-TH Revised and Updated Version 2.0

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Thomas M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Berndt, Markus [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Baglietto, Emilio [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Magolan, Ben [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States)

    2015-10-01

    The purpose of this report is to document a multi-year plan for enhancing turbulence modeling in Hydra-TH for the Consortium for Advanced Simulation of Light Water Reactors (CASL) program. Hydra-TH is being developed to the meet the high- fidelity, high-Reynolds number CFD based thermal hydraulic simulation needs of the program. This work is being conducted within the thermal hydraulics methods (THM) focus area. This report is an extension of THM CASL milestone L3:THM.CFD.P10.02 [33] (March, 2015) and picks up where it left off. It will also serve to meet the requirements of CASL THM level three milestone, L3:THM.CFD.P11.04, scheduled for completion September 30, 2015. The objectives of this plan will be met by: maturation of recently added turbulence models, strategic design/development of new models and systematic and rigorous testing of existing and new models and model extensions. While multi-phase turbulent flow simulations are important to the program, only single-phase modeling will be considered in this report. Large Eddy Simulation (LES) is also an important modeling methodology. However, at least in the first year, the focus is on steady-state Reynolds Averaged Navier-Stokes (RANS) turbulence modeling.

  12. Risk evaluation system for facility safeguards and security planning

    International Nuclear Information System (INIS)

    Udell, C.J.; Carlson, R.L.

    1987-01-01

    The Risk Evaluation System (RES) is an integrated approach to determining safeguards and security effectiveness and risk. RES combines the planning and technical analysis into a format that promotes an orderly development of protection strategies, planning assumptions, facility targets, vulnerability and risk determination, enhancement planning, and implementation. In addition, the RES computer database program enhances the capability of the analyst to perform a risk evaluation of the facility. The computer database is menu driven using data input screens and contains an algorithm for determining the probability of adversary defeat and risk. Also, base case and adjusted risk data records can be maintained and accessed easily

  13. 25 CFR 1000.20 - What is required in a planning report?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What is required in a planning report? 1000.20 Section....20 What is required in a planning report? As evidence that the Tribe/Consortium has completed the planning phase, the Tribe/Consortium must prepare and submit to the Secretary a final planning report. (a...

  14. Computational optimization techniques applied to microgrids planning

    DEFF Research Database (Denmark)

    Gamarra, Carlos; Guerrero, Josep M.

    2015-01-01

    Microgrids are expected to become part of the next electric power system evolution, not only in rural and remote areas but also in urban communities. Since microgrids are expected to coexist with traditional power grids (such as district heating does with traditional heating systems......), their planning process must be addressed to economic feasibility, as a long-term stability guarantee. Planning a microgrid is a complex process due to existing alternatives, goals, constraints and uncertainties. Usually planning goals conflict each other and, as a consequence, different optimization problems...... appear along the planning process. In this context, technical literature about optimization techniques applied to microgrid planning have been reviewed and the guidelines for innovative planning methodologies focused on economic feasibility can be defined. Finally, some trending techniques and new...

  15. Development of a central final repository management for the coordination of the waste for Schacht Konrad from public authorities

    International Nuclear Information System (INIS)

    Graffunder, Iris; Dominke-Bendix, Carola; Waldek, Achim

    2012-01-01

    The central final repository management is supposed to fulfill the following tasks: active collaboration of Konrad contract draft, signing of internal contracts and agreements, cooperation contract with GNS, cooperation with coordination authorities, inventory taking of wastes (existing inventory and prognosis) and interim storage capacities of public authorities, development of planning and management software, optimization of the final repository documentation, container management, logistics concept, long-term disposal planning and prognosis, planning and coordination of the annual waste amount, management and documentation of disposed waste allocation, coordination of transport schedules, consulting service for waste obligations (final repository requirements, product control, documentation).

  16. Quality of family planning services in Northwest Ethiopia | Fantahun ...

    African Journals Online (AJOL)

    Background: The unmet need for family planning services in Ethiopia is believed to be high (36%) while the already available services do not appear to be optimally used by potential clients. It is thus expected that an assessment and improvement of the quality of family planning services could enhance family planning ...

  17. Strategic planning and security analysis

    International Nuclear Information System (INIS)

    DePasquale, S.

    1991-01-01

    Nuclear security master planning is a deliberative process, founded on the premise that the broad scope of security must be analyzed before any meaningful determinations may be reached on an individual security aspect. This paper examines the analytical process required in developing a Security Master Plan. It defines a four stage process concluding with the selection of security measures encompassing physical security, policy and procedure considerations and guard force deployment. The final product orchestrates each security measure in a complementary and supportive configuration

  18. Clinical physics for charged particle treatment planning

    International Nuclear Information System (INIS)

    Chen, G.T.Y.; Pitluck, S.; Lyman, J.T.

    1981-01-01

    The installation of a computerized tomography (CT) scanner which can be used with the patient in an upright position is described. This technique will enhance precise location of tumor position relative to critical structures for accurate charged particle dose delivery during fixed horizontal beam radiotherapy. Pixel-by-pixel treatment planning programs have been developed to calculate the dose distribution from multi-port charged particle beams. The plan includes CT scans, data interpretation, and dose calculations. The treatment planning computer is discussed. Treatment planning for irradiation of ocular melanomas is described

  19. Gap analysis between provisional diagnosis and final diagnosis in government and private teaching hospitals: A record-linked comparative study.

    Science.gov (United States)

    Chatterjee, Sudeshna; Ray, Krishnangshu; Das, Anup Kumar

    2016-01-01

    1. To identify the extent of clinical gaps at the context of knowledge, practice and systems. 2. To formulate necessary intervention measures towards bridging the gaps. Comparative, cross-sectional and non-interventional study. It is retrospective, record-based study conducted upon inpatients ( n = 200) of major disciplines of two teaching hospitals. Major outcome variables were to observe the matching and un-matching of final and provisional diagnosis by using ICD-10 criteria. Comparative analysis of specific and selective gaps were estimated in terms of percentage (%). Pilot observation showed the existence of gaps between provisional and final diagnosis in both private and government institution. Both knowledge and skill gaps were evident in caregivers and gap in documentation was existent in medical records. The pilot data is may be an eye-opener to public and private governance systems for understanding and revising the process service planning and service delivery. Necessary intervention measures may be contemplated towards enhancing diagnostic skill of doctors for quality hospital care.

  20. Handling and final disposal of nuclear waste. Hard Rock Laboratory

    International Nuclear Information System (INIS)

    1989-09-01

    The purpose of the Hard Rock Laboratory is to provide an opportunity for research and development in a realistic and undisturbed underground rock environment down to the depth planned for the future repository. The R and D work in the underground laboratory has the following main goals: To test the quality and appropriateness of different methods for characterizing the bedrock with respect to conditions of importance for a final repository. To refine and demonstrate methods for how to adapt a repository to the local properties of the rock in connection with planning and construction. And, finally, to collect material and data of importance for the safety of the future repository and for confidence in the quality of the safety assessments 13 figs, 3 tabs

  1. Autoradiographic enhancement of polaroid film. Final report, 18 April--17 October 1978

    International Nuclear Information System (INIS)

    Manning, R.G.; Pettijohn, R.R.

    1978-11-01

    SRI International has investigated the application of radiotracer photographic image enhancement (PIE) techniques to increase the photographic speed of three Polaroid Films. SRI has a state-of-the art capability in the field of nondestructive photographic image enhancement of original negatives. These procedures have successfully increased optical density, contrast, and resolution of photographic imagery, and thereby increased the information derivable from original negatives

  2. Public participation in town-planning applications: Tlokwe Local ...

    African Journals Online (AJOL)

    Although public participation is deemed important in South Africa, negative perceptions of its legitimacy are widely acknowledged. Inclusive town-planning processes, as instruments to address inequality, have a significant role in enhancing democracy. This article reports on a study done from a communicative planning ...

  3. Computerized radiation treatment planning

    International Nuclear Information System (INIS)

    Laarse, R. van der.

    1981-01-01

    Following a general introduction, a chain consisting of three computer programs which has been developed for treatment planning of external beam radiotherapy without manual intervention is described. New score functions used for determination of optimal incidence directions are presented and the calculation of the position of the isocentre for each optimum combination of incidence directions is explained. A description of how a set of applicators, covering fields with dimensions of 4 to 20 cm, for the 6 to 20 MeV electron beams of a MEL SL75-20 linear accelerator was developed, is given. A computer program for three dimensional electron beam treatment planning is presented. A microprocessor based treatment planning system for the Selectron remote controlled afterloading system for intracavitary radiotherapy is described. The main differences in treatment planning procedures for external beam therapy with neutrons instead of photons is discussed. A microprocessor based densitometer for plotting isodensity lines in film dosimetry is described. A computer program for dose planning of brachytherapy is presented. Finally a general discussion about the different aspects of computerized treatment planning as presented in this thesis is given. (Auth.)

  4. Design principle of TVO's final repository and preliminary adaptation to site specific conditions

    International Nuclear Information System (INIS)

    Salo, J-P.; Reikkola, R.

    1995-01-01

    Teollisuuden Voima Oy (TVO) is responsible for the management of spent fuel produced by the Olkiluoto power plant. TVO's current programme of spent fuel management is based on the guidelines and time schedule set by the Finnish Government. TVO has studied a final disposal concept in which the spent fuel bundles are encapsulated in copper canisters and emplaced in Finnish bedrock. According to the plan the final repository for spent fuel will be in operation by 2020. TVO's updated technical plans for the disposal of spent fuel together with a performance analysis (TVO-92) were submitted to the authorities in 1992. The paper describes the design principle of TVO's final repository and preliminary adaptation of the repository to site specific conditions. (author). 10 refs., 5 figs

  5. Piping research program plan

    International Nuclear Information System (INIS)

    1988-09-01

    This document presents the piping research program plan for the Structural and Seismic Engineering Branch and the Materials Engineering Branch of the Division of Engineering, Office of Nuclear Regulatory Research. The plan describes the research to be performed in the areas of piping design criteria, environmentally assisted cracking, pipe fracture, and leak detection and leak rate estimation. The piping research program addresses the regulatory issues regarding piping design and piping integrity facing the NRC today and in the foreseeable future. The plan discusses the regulatory issues and needs for the research, the objectives, key aspects, and schedule for each research project, or group of projects focussing of a specific topic, and, finally, the integration of the research areas into the regulatory process is described. The plan presents a snap-shot of the piping research program as it exists today. However, the program plan will change as the regulatory issues and needs change. Consequently, this document will be revised on a bi-annual basis to reflect the changes in the piping research program. (author)

  6. Scenario Planning as Organizational Intervention

    DEFF Research Database (Denmark)

    Balarezo, Jose; Nielsen, Bo Bernhard

    2017-01-01

    existing contributions on scenario planning within a new consolidating framework that includes antecedents, processes, and outcomes. The proposed framework allows for integration of the extant literature on scenario planning from a wide variety of fields, including strategic management, finance, human...... resource management, operations management, and psychology. Findings: This study contributes to research by offering a coherent and consistent framework for understanding scenario planning as a dynamic process. As such, it offers future researchers with a systematic way to ascertain where a particular......Purpose: This paper identifies four areas in need of future research to enhance our theoretical understanding of scenario planning, and sets the basis for future empirical examination of its effects on individual and organizational level outcomes. Design/methodology/approach: This paper organizes...

  7. ITER safety studies: starting the quality plan code AINA

    International Nuclear Information System (INIS)

    Dies, J.; Rivas, J. C.; Bargallo, E.

    2010-01-01

    This contribution discusses the implementation of the Quality Plan AINA Code 2.0. The work has affected areas such as the life cycle model, the software reliability plan, the design of the equipment or software tools to use, and has finally produced a new code.

  8. ICT Strategic Planning for Mazandaran Province

    Directory of Open Access Journals (Sweden)

    Mohammad Reza Shojaie

    2012-02-01

    Full Text Available Today, regarding rapid changes in the environment, any organization, institution or country that overlooks its capabilities, strengths and weaknesses, will face real challenges. Strategic planning in organizations is a common response to these challenges which also facilitate achieving goals in an organization. Today, the importance of ICT is increased, which necessitates ICT strategic planning to use ICT in organizations. So, this study aimed to propose ICT strategic plans for Mazandaran province. For this end, at first using stakeholders' viewpoints, the vision, mission and goals are provided. Then, Internal & External Matrix was suggested and identified factors were ranked using Analytic Network Processing (ANP. Then, concerning strengths, weaknesses, opportunities, threats, and using SWOT analysis, ICT strategies were provided. Finally, using QSPM matrix, the strategies were ranked. Regarding this ranking, dedicated budget to ICT in governmental organizations, using integration architecture, developing organizational and inter-organizational information systems, developing mechanisms to absorb national and local financial resources for extending ICT infrastructures and finally concerning ICT trainings for managers and people, were in the top of the list.

  9. Quality of Family Planning Services in Primary Health Centers of ...

    African Journals Online (AJOL)

    Background: Good quality of care in family planning (FP) services help individuals and couples to meet their reproductive health needs safely and effectively. Therefore, assessment and improvement of the quality of family planning services could enhance family planning services utilization. This study was thus conducted ...

  10. Improvements to Strategic Planning and Implementation through Enhanced Correlation with Decision-Making Frameworks

    Science.gov (United States)

    McCready, John W.

    2010-01-01

    The purpose of this study was to examine use of decision-making tools and feedback in strategic planning in order to develop a rigorous process that would promote the efficiency of strategic planning for acquisitions in the United States Coast Guard (USCG). Strategic planning is critical to agencies such as the USCG in order to be effective…

  11. Final report on plan of action concerning Fukushima

    International Nuclear Information System (INIS)

    2016-12-01

    This brochure published by the Swiss National Safety Inspectorate ENSI discusses various protection measures for nuclear installations in Switzerland. Protection against natural incidents such as earthquakes, flooding and extreme weather conditions is first discussed, followed by a discussion on the protection needed against the loss of fundamental safety functions. These include loss of mains power and loss of heat sink capacity for cooling. Severe Accident Management is also discussed: the setting-up of emergency equipment stores, securing containment integrity, strategies and the organisation of long-term emergency response. Contamination propagation in rivers and streams is looked at, as are the effects of dangerous non-nuclear substances. Emergency response on a national scale is examined. Requirements placed on measurement and prognosis systems, reference scenarios and demands placed on communication systems are noted. Safety culture is looked at in Swiss nuclear installations. ENSI’s supervision culture is also commented on, as are international activities in this area. Finally, current research and measures are examined and a comparison is made with the international investigations made as a result of the Fukushima Incident

  12. Final Environmental Assessment Addressing Implementation of the Integrated Natural Resources Management Plan for Kirtland Air Force Base

    Science.gov (United States)

    2014-09-01

    e.g., photovoltaic panels, solar collection, heat recovery systems, wind turbines , green roofs, and habitat-oriented storm water management) would...comprehensive range planning, cultural resources management planning, Bird /Wildlife Aircraft Strike Hazard planning, and pest management planning. In addition...manage wildlife resources. Assessment of wildlife populations at Kirtland AFB (e.g., bats, birds , predators, and herptiles) would provide a baseline that

  13. When daily planning improves employee performance: The importance of planning type, engagement, and interruptions.

    Science.gov (United States)

    Parke, Michael R; Weinhardt, Justin M; Brodsky, Andrew; Tangirala, Subrahmaniam; DeVoe, Sanford E

    2018-03-01

    Does planning for a particular workday help employees perform better than on other days they fail to plan? We investigate this question by identifying 2 distinct types of daily work planning to explain why and when planning improves employees' daily performance. The first type is time management planning (TMP)-creating task lists, prioritizing tasks, and determining how and when to perform them. We propose that TMP enhances employees' performance by increasing their work engagement, but that these positive effects are weakened when employees face many interruptions in their day. The second type is contingent planning (CP) in which employees anticipate possible interruptions in their work and plan for them. We propose that CP helps employees stay engaged and perform well despite frequent interruptions. We investigate these hypotheses using a 2-week experience-sampling study. Our findings indicate that TMP's positive effects are conditioned upon the amount of interruptions, but CP has positive effects that are not influenced by the level of interruptions. Through this study, we help inform workers of the different planning methods they can use to increase their daily motivation and performance in dynamic work environments. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  14. National Aeronautics and Space Administration FY 02 Revised Final Annual Performance Plan

    Science.gov (United States)

    2002-01-01

    The Government Performance and Results Act (GPRA) was passed by Congress and signed by the President in 1993. GPRA was enacted to improve the efficiency of all Federal agencies, with the following specific goals: (1) Improve Federal program management, effectiveness, and public accountability; (2) Improve Congressional decision making on where to commit the Nation's financial and human resources; and (3) Improve citizen confidence in government performance. GPRA directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The Act directs agencies to manage and measure results to justify Congressional appropriations and authorizations. The Report Consolidation Act of 2000 directs agencies to provide a report on the degree of success in achieving the goals and performance measures defined in the strategic and performance plans one hundred and fifty days after the completion of the fiscal year.

  15. Multi-agency radiation survey and site investigation manual (MARSIM). Final report

    International Nuclear Information System (INIS)

    1997-12-01

    The MARSSIM provides information on planning, conducting, evaluating, and documenting building surface and surface soil final status radiological surveys for demonstrating compliance with dose or risk-based regulations or standards. The MARSSIM is a multi-agency consensus document that was developed collaboratively by four Federal agencies having authority and control over radioactive materials: Department of Defense (DOD), Department of Energy (DOE), Environmental Protection Agency (EPA), and Nuclear Regulatory Commission (NRC). The MARSSIM's objective is to describe a consistent approach for planning, performing, and assessing building surface and surface soil final status surveys to meet established dose or risk-based release criteria, while at the same time encouraging an effective use of resources

  16. Multi-agency radiation survey and site investigation manual (MARSIM). Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The MARSSIM provides information on planning, conducting, evaluating, and documenting building surface and surface soil final status radiological surveys for demonstrating compliance with dose or risk-based regulations or standards. The MARSSIM is a multi-agency consensus document that was developed collaboratively by four Federal agencies having authority and control over radioactive materials: Department of Defense (DOD), Department of Energy (DOE), Environmental Protection Agency (EPA), and Nuclear Regulatory Commission (NRC). The MARSSIM`s objective is to describe a consistent approach for planning, performing, and assessing building surface and surface soil final status surveys to meet established dose or risk-based release criteria, while at the same time encouraging an effective use of resources.

  17. Strategic plan for geriatrics and extended care in the veterans health administration: background, plan, and progress to date.

    Science.gov (United States)

    Shay, Kenneth; Hyduke, Barbara; Burris, James F

    2013-04-01

    The leaders of Geriatrics and Extended Care (GEC) in the Veterans Health Administration (VHA) undertook a strategic planning process that led to approval in 2009 of a multidisciplinary, evidence-guided strategic plan. This article reviews the four goals contained in that plan and describes VHA's progress in addressing them. The goals included transforming the healthcare system to a veteran-centric approach, achieving universal access to a panel of services, ensuring that the Veterans Affair's (VA) healthcare workforce was adequately prepared to manage the needs of the growing elderly veteran population, and integrating continuous improvement into all care enhancements. There has been substantial progress in addressing all four goals. All VHA health care has undergone an extensive transformation to patient-centered care, has enriched the services it can offer caregivers of dependent veterans, and has instituted models to better integrate VA and non-VA cares and services. A range of successful models of geriatric care described in the professional literature has been adapted to VA environments to gauge suitability for broader implementation. An executive-level task force developed a three-pronged approach for enhancing the VA's geriatric workforce. The VHA's performance measurement approaches increasingly include incentives to enhance the quality of management of vulnerable elderly adults in primary care. The GEC strategic plan was intended to serve as a road map for keeping VHA aligned with an ambitious but important long-term vision for GEC services. Although no discrete set of resources was appropriated for fulfillment of the plan's recommendations, this initial report reflects substantial progress in addressing most of its goals. © 2013, Copyright the Authors Journal compilation © 2013, The American Geriatrics Society.

  18. Restricted Field IMRT Dramatically Enhances IMRT Planning for Mesothelioma

    International Nuclear Information System (INIS)

    Allen, Aaron M.; Schofield, Deborah; Hacker, Fred; Court, Laurence E.; Czerminska, Maria M.S.

    2007-01-01

    Purpose: To improve the target coverage and normal tissue sparing of intensity-modulated radiotherapy (IMRT) for mesothelioma after extrapleural pneumonectomy. Methods and Materials: Thirteen plans from patients previously treated with IMRT for mesothelioma were replanned using a restricted field technique. This technique was novel in two ways. It limited the entrance beams to 200 o around the target and three to four beams per case had their field apertures restricted down to the level of the heart or liver to further limit the contralateral lung dose. New constraints were added that included a mean lung dose of <9.5 Gy and volume receiving ≥5 Gy of <55%. Results: In all cases, the planning target volume coverage was excellent, with an average of 97% coverage of the planning target volume by the target dose. No change was seen in the target coverage with the new technique. The heart, kidneys, and esophagus were all kept under tolerance in all cases. The average mean lung dose, volume receiving ≥20 Gy, and volume receiving ≥5 Gy with the new technique was 6.6 Gy, 3.0%, and 50.8%, respectively, compared with 13.8 Gy, 15%, and 90% with the previous technique (p < 0.0001 for all three comparisons). The maximal value for any case in the cohort was 8.0 Gy, 7.3%, and 57.5% for the mean lung dose, volume receiving ≥20 Gy, and volume receiving ≥5 Gy, respectively. Conclusion: Restricted field IMRT provides an improved method to deliver IMRT to a complex target after extrapleural pneumonectomy. An upcoming Phase I trial will provide validation of these results

  19. State of emergency preparedness for US health insurance plans.

    Science.gov (United States)

    Merchant, Raina M; Finne, Kristen; Lardy, Barbara; Veselovskiy, German; Korba, Caey; Margolis, Gregg S; Lurie, Nicole

    2015-01-01

    Health insurance plans serve a critical role in public health emergencies, yet little has been published about their collective emergency preparedness practices and policies. We evaluated, on a national scale, the state of health insurance plans' emergency preparedness and policies. A survey of health insurance plans. We queried members of America's Health Insurance Plans, the national trade association representing the health insurance industry, about issues related to emergency preparedness issues: infrastructure, adaptability, connectedness, and best practices. Of 137 health insurance plans queried, 63% responded, representing 190.6 million members and 81% of US plan enrollment. All respondents had emergency plans for business continuity, and most (85%) had infrastructure for emergency teams. Some health plans also have established benchmarks for preparedness (eg, response time). Regarding adaptability, 85% had protocols to extend claim filing time and 71% could temporarily suspend prior medical authorization rules. Regarding connectedness, many plans shared their contingency plans with health officials, but often cited challenges in identifying regulatory agency contacts. Some health insurance plans had specific policies for assisting individuals dependent on durable medical equipment or home healthcare. Many plans (60%) expressed interest in sharing best practices. Health insurance plans are prioritizing emergency preparedness. We identified 6 policy modifications that health insurance plans could undertake to potentially improve healthcare system preparedness: establishing metrics and benchmarks for emergency preparedness; identifying disaster-specific policy modifications, enhancing stakeholder connectedness, considering digital strategies to enhance communication, improving support and access for special-needs individuals, and developing regular forums for knowledge exchange about emergency preparedness.

  20. Evolution of the Birth Plan

    OpenAIRE

    Kaufman, Tamara

    2007-01-01

    Many birth professionals are discarding the birth plan as an outdated and ineffectual document. This column discusses the past limitations and present uses of the birth plan in an effort to enhance current teaching on how expectant parents can write and use this important document. Encouraging expectant parents to prepare two separate, but corresponding, birth plans—the “Discussion Birth Plan” and the “Hospital Birth Plan”—is proposed. Teaching suggestions and possible implications are explor...

  1. Tax planning strategies for physicians.

    Science.gov (United States)

    Pope, Thomas R; Schwartz, Richard W

    2002-07-01

    The development of tax reduction strategies is a critical aspect of both corporate and personal financial planning because taxes represent the largest annual expenditure for the majority of Americans. The categories of tax reduction strategies discussed include charitable-giving techniques, ways to maximize business deductions, shifting income to family members, education tax incentives, retirement planning, and small business tax considerations. One use for these tax savings is the enhancement of a corporation's capabilities to provide services to patients.

  2. Operational Plan Ontology Model for Interconnection and Interoperability

    Science.gov (United States)

    Long, F.; Sun, Y. K.; Shi, H. Q.

    2017-03-01

    Aiming at the assistant decision-making system’s bottleneck of processing the operational plan data and information, this paper starts from the analysis of the problem of traditional expression and the technical advantage of ontology, and then it defines the elements of the operational plan ontology model and determines the basis of construction. Later, it builds up a semi-knowledge-level operational plan ontology model. Finally, it probes into the operational plan expression based on the operational plan ontology model and the usage of the application software. Thus, this paper has the theoretical significance and application value in the improvement of interconnection and interoperability of the operational plan among assistant decision-making systems.

  3. Final disposal of spent nuclear fuel

    International Nuclear Information System (INIS)

    Thoregren, U.

    1983-04-01

    Like many other countries whith similar geological conditions, Sweden plans to dispose of its long-lived radioactive nuclear waste by depositing it in final repositories located deep down in the crystalline bedrock. In order to be able to demonstrate that a given rock formation is suited for waste storage, it is necessary to have knowledge concerning its properties, particularly those that determine groundwater conditions and chemistry within the area. Also of importance are data that shed light on rock mechanics in the area and the occurrence of valuable minerals. The SKBF/KBS programme includes plans to carry out geological studies of 10-15 areas in different parts of the country during the 1980s. A standard programme for these studies is described in the following. The standard programme is inteded to serve as a basis for planning of the work and revisions or modifications that may be found to be appropriate in view of local conditions or experience. (author)

  4. Repository documentation rethought. A comprehensive approach from untreated waste to waste packages for final disposal

    Energy Technology Data Exchange (ETDEWEB)

    Anthofer, Anton Philipp; Schubert, Johannes [VPC GmbH, Dresden (Germany)

    2017-11-15

    The German Act on Reorganization of Responsibility for Nuclear Disposal (Entsorgungsuebergangsgesetz (EntsorgUebG)) adopted in June 2017 provides the energy utilities with the new option of transferring responsibility for their waste packages to the Federal Government. This is conditional on the waste packages being approved for delivery to the Konrad final repository. A comprehensive approach starts with the dismantling of nuclear facilities and extends from waste disposal and packaging planning to final repository documentation. Waste package quality control measures are planned and implemented as early as in the process qualification stage so that the production of waste packages that are suitable for final deposition can be ensured. Optimization of cask and loading configuration can save container and repository volume. Workflow planning also saves time, expenditure and exposure time for personnel at the facilities. VPC has evaluated this experience and developed it into a comprehensive approach.

  5. Planning Support Systems (PSS-Based Spatial Plan Alternatives and Environmental Assessment

    Directory of Open Access Journals (Sweden)

    Hee-Sun Choi

    2016-03-01

    Full Text Available Spatial planning is at the core of national land and urban development. Many countries and cities seek sustainable development through various means such as coordinated environmental planning, environmental assessment, and internalization of environmental analysis and planning. A Planning Support System (PSS is a GIS (Geographic Information System-based, spatial decision-making support system that incorporates a variety of theories and pertinent models. This study adopted the “What if?” model to design an alternative spatial plan that includes generation of predictive scenarios and is relatively easy to use. In the cities studied, we identified a total of six scenarios based on the main drivers of development—namely, population and spatial policies. Subsequently, we assessed the alternatives for their environmental impact, preparing sensitivity maps for each major environmental issue in the target area (natural ecosystem, air and microclimate, natural disasters. One projected advantage of the “What if?” model is that its digital visualization of proposed plans may improve public awareness and involvement. Furthermore, the tool is expected to be highly useful in ensuring the objectivity of quantitative analyses. However, it is necessary to develop a PSS that is both standardized and tailored to the particular needs of each area. Finally, the development of an e-governance system will be beneficial in ensuring public access to the decision making process.

  6. Enhancing the Career Planning Self-Determination of Young Adults with Mental Health Challenges.

    Science.gov (United States)

    Sowers, Jo-Ann; Swank, Paul

    2017-01-01

    The impact of an intervention on the self-determination and career planning engagement of young adults with mental health challenges was studied. Sixty-seven young adults, 20 to 30 years of age, with mental health diagnoses (e.g., depression, bipolar disorder) were randomly assigned to intervention and control groups. Statistically significant greater increases were made by the intervention group versus the control group for self-determination and career planning engagement, and self-determination at least partially mediated increases in career planning engagement. With career planning self-determination interventions, young adults with mental health challenges might be able to achieve better career and life outcomes than is typical for this population.

  7. Customer acquisition plan for a small-size entrepreneur

    OpenAIRE

    Puotiniemi, Tiia

    2014-01-01

    The aim of this thesis was to draw a customer acquisition plan and improve the marketing planning in the company. Therefore, the final result was the market research summary. Development of the marketing strategy planning was based on internal and external situation analyses. This thesis is concentrated on a small-size operator’s business and therefore the internet marketing was brought up with its profitable benefits and advantages. The thesis was written as an auxiliary guide to build u...

  8. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  9. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  10. Routine Radiological Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Bechtel Nevada

    1998-01-01

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs

  11. Document status for 1 and 2 Kozloduy NPP decommissioning activities -Phase 'Final Shutdown'

    International Nuclear Information System (INIS)

    Vangev, A.; Boyadjiev, Z.

    1997-01-01

    Decommissioning process (D and D) is the final phase of each nuclear reactor life cycle. The first nuclear reactor generation has reached his expiration life date. Decommissioning working documentation had not been taken into account at the project and construction stage. The decommissioning activities, planning and legislation has to develop along their operation. Most of developed nuclear energetic countries have gathered good experience and have create their own decommissioning strategy. This report represents in brief an overview of different country's approaches and the Kozloduy NPP decommissioning activity intention in near future and reviews the D and D working document status for 1 and 2 Kozloduy NPP Units decommissioning. Kozloduy NPP D and D task to the moment is to plan the first stage of the decommissioning process - 'The Final Shutdown' and to prepare the working documents for the phase execution. The Final Shutdown of Kozloduy NPP - 1 is the termination of operation of the Units 1 and 2 and the electricity production cessation after their useful life exhaust. In accordance with the legal legislation in Bulgaria only the normal planned termination of operation on units 1 and 2 should be prescribed. The project results concern the initial condition of the equipment and systems, their preparation and sequence for defueling, decontamination and dismantling. A plan for activities' organization for D and D and Complex Characterization of the Site under consideration will contain the following documents: 1. Time-schedule for the sequence of activities during the stages of the Final Shutdown and Safe Enclosure preparation. Technical project for organization of work related to Final Shutdown; 2. Complex Characterization Programme for a condition investigation of the Units 1 and 2 equipment and systems. 3. Technical project for design modifications and dismantling of equipment and systems which violate the radiation and nuclear safety during the Final Shutdown

  12. Burrell, Pennsylvania, vicinty property Long-Term Surveillance Plan. Final report

    International Nuclear Information System (INIS)

    1993-09-01

    The purpose of this document is to establish elements of the US Department of Energy (DOE) Long-Term Surveillance Plan (LTSP) for the Burrell, Pennsylvania, vicinity property. The US Nuclear Regulatory Commission (NRC) will use this plan to support the issuance of a license for the long-term surveillance and maintenance of the Burrell vicinity property. The DOE and the NRC previously reached agreement regarding the issuance of a license for the Burrell vicinity property. This is a departure from the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, which requires the licensing only of disposal sites, not vicinity properties. However, given the unusually large volume of wastes and the distance from the Canonsburg disposal cell of the Burrell vicinity property, it was agreed that a license for a designed disposal cell with surveillance requirements constituted a reasonable and prudent approach in keeping with the spirit of UMTRCA. The Burrell vicinity property covers approximately 29 hectares (72 acres). Disposal of the 10,500 tonnes (I 1,600 tons) of residual radioactive material (RRM) removed from the Canonsburg Uranium Mill Tailings Remedial Action (UMTRA) Project site took place within an approximately 0.6-hectare (1.6-acre) section in the western portion and an approximately 0.6-hectare (1.6-acre) section in the eastern portion of the Burrell vicinity property. The RRM was brought in as fill for under the ConRail railroad tracks. The excess RRM was placed in a storage location adjacent to the Conemaugh River at Burrell, which was later added to the disposal area. The disposal area contains a total of 78,000 tonnes (86,000 tons) of RRM

  13. Robotic-Arm Assisted Total Knee Arthroplasty Demonstrated Greater Accuracy and Precision to Plan Compared with Manual Techniques.

    Science.gov (United States)

    Hampp, Emily L; Chughtai, Morad; Scholl, Laura Y; Sodhi, Nipun; Bhowmik-Stoker, Manoshi; Jacofsky, David J; Mont, Michael A

    2018-05-01

    This study determined if robotic-arm assisted total knee arthroplasty (RATKA) allows for more accurate and precise bone cuts and component position to plan compared with manual total knee arthroplasty (MTKA). Specifically, we assessed the following: (1) final bone cuts, (2) final component position, and (3) a potential learning curve for RATKA. On six cadaver specimens (12 knees), a MTKA and RATKA were performed on the left and right knees, respectively. Bone-cut and final-component positioning errors relative to preoperative plans were compared. Median errors and standard deviations (SDs) in the sagittal, coronal, and axial planes were compared. Median values of the absolute deviation from plan defined the accuracy to plan. SDs described the precision to plan. RATKA bone cuts were as or more accurate to plan based on nominal median values in 11 out of 12 measurements. RATKA bone cuts were more precise to plan in 8 out of 12 measurements ( p  ≤ 0.05). RATKA final component positions were as or more accurate to plan based on median values in five out of five measurements. RATKA final component positions were more precise to plan in four out of five measurements ( p  ≤ 0.05). Stacked error results from all cuts and implant positions for each specimen in procedural order showed that RATKA error was less than MTKA error. Although this study analyzed a small number of cadaver specimens, there were clear differences that separated these two groups. When compared with MTKA, RATKA demonstrated more accurate and precise bone cuts and implant positioning to plan. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  14. 1994 Panel 1 Utilization Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The Waste Isolation Pilot Plant (WIPP) is intended to receive, handle, and permanently dispose of transuranic (TRU) waste. To fulfill this mission, the U.S. Department of Energy (DOE) constructed a full-scale facility to demonstrate both technical and operational principles of the permanent isolation of TRU waste. The WIPP consists of surface and underground facilities. Panel 1 is situated in the underground facility horizon which is located approximately 2,150 feet below the surface in the predominantly halite Salado Formation. The Panel 1 Utilization Plan provides a strategy for the optimum use of Panel 1 which is consistent with the priorities established by the DOE to accomplish the WIPP mission. These priorities, which include maintaining personnel safety, conducting performance assessment, and continued operational enhancements, are the guiding premise for the decisions on the planned usage of the WIPP underground facility. The continuation of ongoing investigations along with the planned testing and training to be carried out in Panel 1 will enhance the current knowledge and understanding of the operational and geotechnical aspects of the panel configuration. This enhancement will ultimately lead to safer, more efficient, and more cost-effective methods of operation. Excavation of the waste storage area began in May 1986 with the mining of entries to Panel 1. The original design for the waste storage rooms at the WIPP provided a limited period of time during which to mine the openings and to emplace waste. Each panel, consisting of seven storage rooms, was scheduled to be mined and filled in less than 5 years. Panel 1 was developed to receive waste for a demonstration phase that was scheduled to start in October 1988. The demonstration phase was deferred, and the experimental test program was modified to use contact-handled (CH) transuranic waste in bin-scale tests, planned for Room 1, Panel 1

  15. OSM-ORIENTED METHOD OF MULTIMODAL ROUTE PLANNING

    Directory of Open Access Journals (Sweden)

    X. Li

    2015-07-01

    Full Text Available With the increasing pervasiveness of basic facilitate of transportation and information, the need of multimodal route planning is becoming more essential in the fields of communication and transportation, urban planning, logistics management, etc. This article mainly described an OSM-oriented method of multimodal route planning. Firstly, it introduced how to extract the information we need from OSM data and build proper network model and storage model; then it analysed the accustomed cost standard adopted by most travellers; finally, we used shortest path algorithm to calculate the best route with multiple traffic means.

  16. Setting planned leadtimes in customer-order-driven assembly systems

    NARCIS (Netherlands)

    Atan, Z.; Kok, de A.G.; Dellaert, N.P.; Janssen, F.B.S.L.P.; Boxel, van R.

    2016-01-01

    We study an assembly system with a number of parallel multistage processes feeding a multistage final assembly process. Each stage has a stochastic throughput time. We assume that the system is controlled by planned leadtimes at each stage. From these planned leadtimes the start and due times of all

  17. ENPEP model enhancements at ANL

    International Nuclear Information System (INIS)

    Guziel, K.A.

    1997-01-01

    Argonne National Laboratory (ANL) has been involved in energy and electricity planning analyses for almost 20 years. Their activities include the development of analytical tools and methodologies along with their application to a wide variety of national energy planning studies. The methodologies cover all aspects of energy planning. In response to a request by the US Department of Energy (USDOE) to integrate existing tools into a package that could be distributed to developing countries for their own use, the ENergy and Power Evaluation Program (ENPEP) was developed. The USDOE wanted an all purpose tool that would allow the user to do a complete energy analysis, from demand forecast through primary energy resources allocation to electricity generation system expansion plan and environmental analysis. Since its original development, the ENPEP modules have been improved and enhanced to incorporate advancements in computer hardware and software technology, as well as to correct bugs that were identified in the programs. In cooperation with other organizations (e.g. The World Bank - IBRD - and the International Atomic Energy Agency - IAEA -), the ENPEP package has been used at national, regional and inter-regional training courses, as well as in the conduct of national energy/electricity planning studies. This paper reviews the development of the ENPEP package and the proposed enhancements to the package. (author). 1 fig., 2 tabs

  18. ENPEP model enhancements at ANL

    Energy Technology Data Exchange (ETDEWEB)

    Guziel, K A [Decision and Information Sciences Div., Argonne National Lab., Argonne, IL (United States)

    1997-09-01

    Argonne National Laboratory (ANL) has been involved in energy and electricity planning analyses for almost 20 years. Their activities include the development of analytical tools and methodologies along with their application to a wide variety of national energy planning studies. The methodologies cover all aspects of energy planning. In response to a request by the US Department of Energy (USDOE) to integrate existing tools into a package that could be distributed to developing countries for their own use, the ENergy and Power Evaluation Program (ENPEP) was developed. The USDOE wanted an all purpose tool that would allow the user to do a complete energy analysis, from demand forecast through primary energy resources allocation to electricity generation system expansion plan and environmental analysis. Since its original development, the ENPEP modules have been improved and enhanced to incorporate advancements in computer hardware and software technology, as well as to correct bugs that were identified in the programs. In cooperation with other organizations (e.g. The World Bank - IBRD - and the International Atomic Energy Agency - IAEA -), the ENPEP package has been used at national, regional and inter-regional training courses, as well as in the conduct of national energy/electricity planning studies. This paper reviews the development of the ENPEP package and the proposed enhancements to the package. (author). 1 fig., 2 tabs.

  19. BUSINESS PLANS INFORMED BY DESIGN

    DEFF Research Database (Denmark)

    Petersen, Sørren Ingomar; Heebøll, John

    2011-01-01

    Today the value created by applying design at a business model and innovation level as opposed to a design and process level is marginal. Interviews with product developers from academia and industry suggest this is due to a lack of design perspective when formulating and evaluating business plans...... types. These were the design of products based on sustainable and on disruptive technologies. In conclusion, we recommend a procedure to align and translate business plan content into inspirational design briefs for enhancing design concept synthesis performance........ To remedy this, we propose including Design Quality Criteria drivers in the formulation of business plans. While auditing entrepreneurial business plans and design briefs content gaps were revealed between them. Strategy and context differences as well as a negative correlation between investors’ business...

  20. Energy Organizational Planning

    Energy Technology Data Exchange (ETDEWEB)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty – control and manage their natural resource assets – i.e. develop its own energy resources, meet the current and projected energy needs of their community, and “sit at the table” with other regional energy providers to deal with issues on a peer-to-peer basis.

  1. ITER safety studies: starting the quality plan code AINA; Estudios de seguridad de ITER: Puesta en marcha del plan de calidad del Codigo AINA

    Energy Technology Data Exchange (ETDEWEB)

    Dies, J.; Rivas, J. C.; Bargallo, E.

    2010-07-01

    This contribution discusses the implementation of the Quality Plan AINA Code 2.0. The work has affected areas such as the life cycle model, the software reliability plan, the design of the equipment or software tools to use, and has finally produced a new code.

  2. Comments on "Women, Development Planning and Government Policies in Pakistan".

    Science.gov (United States)

    Hafeez, S

    1992-01-01

    Commentary on Shahnaz and Bilquees Raza's paper on women in development in Pakistan is supportive of the content analysis of the Sixth and Seventh 5-Year Plans and policies, but critical of the methods used n the analysis. The parallel to survey research methods was made in that there was a specification of 1) the unit of analysis (reference to each policy measure, each chapter, each page of the plan), 2) the rationale for the plan, 3) specific objectives of the examination, and 4) the criteria for analysis. Missing also was the identification of policy trends from the Fourth and Fifth 5-Year Plans. The question is never answered as to why gender issues were not directed to the agricultural sector. The conclusion that there was a hugh gap between intentions and implementation was an issue not unique to women's issues, and a deeper analysis may have been required in order to understand the nature and magnitude of the gaps for women's policies and their productive roles. Questions should have been directed to the issues of the root causes of gaps in planning and implementation of policies and programs for women in development, and the identification of quantitative and qualitative indicators of gaps. Questions arise as to whether the gaps have changed with changes in the strength of political and social will in various decades. Recognition was given by the authors to the low budget allocations between 1955 and 1970 to education and health which affected both men and women, but there was scant mention of the strong social, not political, will to enhance women's welfare prevalent at this time. Information was lacking on the differences between the Sixth and Seventh sectoral plans for agricultural employment and women and the working groups plans that did include women in agricultural employment; the question is why the working plans were not incorporated into the final plans, and why the working groups did not protest this omission. The lack of political and social

  3. Surfactant-enhanced alkaline flooding for light oil recovery. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Wasan, D.T.

    1996-05-01

    In this report, we present the results of our experimental and theoretical studies in surfactant-enhanced alkaline flooding for light oil recovery. The overall objective of this work is to develop a very cost-effective method for formulating a successful surfactant-enhanced alkaline flood by appropriately choosing mixed alkalis which form inexpensive buffers to obtain the desired pH (between 8.5 and 12. 0) for ultimate spontaneous emulsification and ultralow interfacial tension. In addition, we have (1) developed a theoretical interfacial activity model for determining equilibrium interfacial tension, (2) investigated the mechanisms for spontaneous emulsification, (3) developed a technique to monitor low water content in oil and (4) developed a technique to study water-in-oil emulsion film properties, (5) investigated the effect of surfactant on the equilibrium and transient interfacial tension, (6) investigated the kinetics of oil removal from a silica surface, and (7) developed a theoretical interfacial activity model for determining equilibrium interfacial tension, accounting for added surfactant. The results of the studies conducted during the course of this project are discussed.

  4. Planning developments in British Nuclear Fuels Ltd

    Energy Technology Data Exchange (ETDEWEB)

    Roper, D A [British Nuclear Fuels Ltd., Risley

    1978-10-01

    The state of the corporate planning art in British Nuclear Fuels Ltd. was described by N.R.Geary (Long Range Planning, September (1973)) just 2 years after Company formation. This article discusses more recent planning developments over the period to date during which the Company adopted a Divisionalized structure (from October 1974) and has been required to submit an annual Company plan to the Department of Energy (from November 1975). Background information on the origin and nature of the BNFL and its business, and the particular features of the Company which reflect into the nature and method of its planning were given in the 1973 article and only a brief introductory updating of the Company position is included here. Subsequently the features and problems of BNFL's operating and development planning system are described. Finally, messages arising from BNFL's planning experience to date which may be of general application and therefore of value to other practitioners of planning are listed.

  5. Linear Temporal Logic-based Mission Planning

    Directory of Open Access Journals (Sweden)

    Anil Kumar

    2016-06-01

    Full Text Available In this paper, we describe the Linear Temporal Logic-based reactive motion planning. We address the problem of motion planning for mobile robots, wherein the goal specification of planning is given in complex environments. The desired task specification may consist of complex behaviors of the robot, including specifications for environment constraints, need of task optimality, obstacle avoidance, rescue specifications, surveillance specifications, safety specifications, etc. We use Linear Temporal Logic to give a representation for such complex task specification and constraints. The specifications are used by a verification engine to judge the feasibility and suitability of plans. The planner gives a motion strategy as output. Finally a controller is used to generate the desired trajectory to achieve such a goal. The approach is tested using simulations on the LTLMoP mission planning tool, operating over the Robot Operating System. Simulation results generated using high level planners and low level controllers work simultaneously for mission planning and controlling the physical behavior of the robot.

  6. Safety Culture Enhancement Project. Final Report. A Field Study on Approaches to Enhancement of Safety Culture

    Energy Technology Data Exchange (ETDEWEB)

    Lowe, Andrew; Hayward, Brent (Dedale Asia Pacific, Albert Park VIC 3206 (Australia))

    2006-08-15

    This report documents a study with the objective of enhancing safety culture in the Swedish nuclear power industry. A primary objective of this study was to ensure that the latest thinking on human factors principles was being recognised and applied by nuclear power operators as a means of ensuring optimal safety performance. The initial phase of the project was conducted as a pilot study, involving the senior management group at one Swedish nuclear power-producing site. The pilot study enabled the project methodology to be validated after which it was repeated at other Swedish nuclear power industry sites, providing a broad-ranging analysis of opportunities across the industry to enhance safety culture. The introduction to this report contains an overview of safety culture, explains the background to the project and sets out the project rationale and objectives. The methodology used for understanding and analysing the important safety culture issues at each nuclear power site is then described. This section begins with a summary of the processes used in the information gathering and data analysis stage. The six components of the Management Workshops conducted at each site are then described. These workshops used a series of presentations, interactive events and group exercises to: (a) provide feedback to site managers on the safety culture and safety leadership issues identified at their site, and (b) stimulate further safety thinking and provide 'take-away' information and leadership strategies that could be applied to promote safety culture improvements. Section 3, project Findings, contains the main observations and output from the project. These include: - a brief overview of aspects of the local industry operating context that impinge on safety culture; - a summary of strengths or positive attributes observed within the safety culture of the Swedish nuclear industry; - a set of identified opportunities for further improvement; - the aggregated

  7. Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan; FINAL

    International Nuclear Information System (INIS)

    CLARK, D.L.

    1999-01-01

    The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000

  8. Advanced Education and Technology Business Plan, 2008-11

    Science.gov (United States)

    Alberta Advanced Education and Technology, 2008

    2008-01-01

    The Ministry of Advanced Education and Technology's 2008-11 business plan identifies how it plans to work over the next three years to enhance advanced learning opportunities and innovation for all Albertans. Alberta's advanced learning system is composed of public board-governed institutions, the apprenticeship and industry training system,…

  9. Optimal motion planning using navigation measure

    Science.gov (United States)

    Vaidya, Umesh

    2018-05-01

    We introduce navigation measure as a new tool to solve the motion planning problem in the presence of static obstacles. Existence of navigation measure guarantees collision-free convergence at the final destination set beginning with almost every initial condition with respect to the Lebesgue measure. Navigation measure can be viewed as a dual to the navigation function. While the navigation function has its minimum at the final destination set and peaks at the obstacle set, navigation measure takes the maximum value at the destination set and is zero at the obstacle set. A linear programming formalism is proposed for the construction of navigation measure. Set-oriented numerical methods are utilised to obtain finite dimensional approximation of this navigation measure. Application of the proposed navigation measure-based theoretical and computational framework is demonstrated for a motion planning problem in a complex fluid flow.

  10. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  11. The business plan of Izakaya restaurant in Helsinki

    OpenAIRE

    Du, Peng

    2017-01-01

    The objective of thesis was to study the main areas of creating a business plan and to make research toward the current market environment of Asian fusion restaurant in the Helsinki area in order to make a realistic business plan of a Japanese Izakaya restaurant. The theoretical study is based on several business books, some suggestion from different types of restaurant owners in Helsinki, the business plan outline was finally made. For the empirical study, a survey of market analysis,...

  12. Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-02-02

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

  13. 78 FR 12353 - Winter Use Plan, Supplemental Environmental Impact Statement, Yellowstone National Park

    Science.gov (United States)

    2013-02-22

    ...] Winter Use Plan, Supplemental Environmental Impact Statement, Yellowstone National Park AGENCY: National... Final Supplemental Environmental Impact Statement (SEIS) for a Winter Use Plan for Yellowstone National... link to the 2012 Supplemental Winter Use Plan EIS), and at Yellowstone National Park headquarters...

  14. Remedial action planning for Trench 1

    International Nuclear Information System (INIS)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.; Castaneda, N.

    1998-01-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site

  15. Exploring evidence-policy linkages in health research plans: A case study from six countries

    Directory of Open Access Journals (Sweden)

    Oladepo Oladimeji

    2008-03-01

    Full Text Available Abstract The complex evidence-policy interface in low and middle income country settings is receiving increasing attention. Future Health Systems (FHS: Innovations for Equity, is a research consortium conducting health systems explorations in six Asian and African countries: Bangladesh, India, China, Afghanistan, Uganda, and Nigeria. The cross-country research consortium provides a unique opportunity to explore the research-policy interface. Three key activities were undertaken during the initial phase of this five-year project. First, key considerations in strengthening evidence-policy linkages in health system research were developed by FHS researchers through workshops and electronic communications. Four key considerations in strengthening evidence-policy linkages are postulated: development context; research characteristics; decision-making processes; and stakeholder engagement. Second, these four considerations were applied to research proposals in each of the six countries to highlight features in the research plans that potentially strengthen the research-policy interface and opportunities for improvement. Finally, the utility of the approach for setting research priorities in health policy and systems research was reflected upon. These three activities yielded interesting findings. First, developmental consideration with four dimensions – poverty, vulnerabilities, capabilities, and health shocks – provides an entry point in examining research-policy interfaces in the six settings. Second, research plans focused upon on the ground realities in specific countries strengthens the interface. Third, focusing on research prioritized by decision-makers, within a politicized health arena, enhances chances of research influencing action. Lastly, early and continued engagement of multiple stakeholders, from local to national levels, is conducive to enhanced communication at the interface. The approach described has four main utilities: first

  16. Medicaid program; state plan home and community-based services, 5-year period for waivers, provider payment reassignment, and home and community-based setting requirements for Community First Choice and home and community-based services (HCBS) waivers. Final rule.

    Science.gov (United States)

    2014-01-16

    This final rule amends the Medicaid regulations to define and describe state plan section 1915(i) home and community-based services (HCBS) under the Social Security Act (the Act) amended by the Affordable Care Act. This rule offers states new flexibilities in providing necessary and appropriate services to elderly and disabled populations. This rule describes Medicaid coverage of the optional state plan benefit to furnish home and community based-services and draw federal matching funds. This rule also provides for a 5-year duration for certain demonstration projects or waivers at the discretion of the Secretary, when they provide medical assistance for individuals dually eligible for Medicaid and Medicare benefits, includes payment reassignment provisions because state Medicaid programs often operate as the primary or only payer for the class of practitioners that includes HCBS providers, and amends Medicaid regulations to provide home and community-based setting requirements related to the Affordable Care Act for Community First Choice State plan option. This final rule also makes several important changes to the regulations implementing Medicaid 1915(c) HCBS waivers.

  17. A business process for enhanced heavy oil recovery research and development

    International Nuclear Information System (INIS)

    Carlson, P.; Campbell, M.; Kantzas, A.

    1995-01-01

    Husky Oil's enhanced oil recovery (EOR) research management processes for reducing process development time and increasing investment efficiency were described. The considerations that went into the development of the plan a decade ago were reviewed and new ideas incorporated into the revised plan were presented. Four case studies were presented to illustrate the need for process to reservoir matching. A need for strategic research planning was emphasized. Proposed technologies for enhancement of heavy oil reservoir productivity were presented in tabular form. 1 tab., 7 figs

  18. [Preoperative imaging/operation planning for liver surgery].

    Science.gov (United States)

    Schoening, W N; Denecke, T; Neumann, U P

    2015-12-01

    The currently established standard for planning liver surgery is multistage contrast media-enhanced multidetector computed tomography (CM-CT), which as a rule enables an appropriate resection planning, e.g. a precise identification and localization of primary and secondary liver tumors as well as the anatomical relation to extrahepatic and/or intrahepatic vascular and biliary structures. Furthermore, CM-CT enables the measurement of tumor volume, total liver volume and residual liver volume after resection. Under the condition of normal liver function a residual liver volume of 25 % is nowadays considered sufficient and safe. Recent studies in patients with liver metastases of colorectal cancer showed a clear staging advantage of contrast media-enhanced magnetic resonance imaging (CM-MRI) versus CM-CT. In addition, most recent data showed that the use of liver-specific MRI contrast media further increases the sensitivity and specificity of detection of liver metastases. This imaging technology seems to lead closer to the ideal "one stop shopping" diagnostic tool in preoperative planning of liver resection.

  19. Conference on microbiological processes useful in enhanced oil recovery. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-10-01

    Six formal presentations were made at the meeting, followed by four workshops dealing with specific topics: bioengineering, reservoir ecology and environment, transformations, and bioproducts. All were related to microbial enhancement of oil recovery. (DLC)

  20. Savannah River Site FY 1998 Spent Nuclear Fuel Interim Management Plan

    International Nuclear Information System (INIS)

    Dupont, M.E.

    1998-01-01

    This document has been prepared to present in one place the near and long-term plans for safe management of Savannah River Site (SRS) spent nuclear fuel inventories until final disposition has been identified and implemented. The activities described are consistent with FY 1998 Annual Operational Plan guidance and with the December 1997 SRS Accelerated Cleanup Plan update. Summarized are highlights, key decision dates, and baseline assumptions of this plan

  1. Activities related to site characterization in ENRESA's research and development plan

    International Nuclear Information System (INIS)

    Olmo, C. del; Astudillo, J.; Bajos, C.; Hernan, P.

    1995-01-01

    Following a short introduction that summarizes the global strategy for high-level waste (HLW) disposal, an outline is given of the El Berrocal Project, with an emphasis on site characterization is given. The article focuses special attention on the technological developments achieved over the last few years within the framework of the ENRESA R and D Plans, both in global terms and within the El Berrocal project in particular, regarding the conception and construction of mobile hydrogeological and hydrogeochemical characterization units and the performance of tracer tests. These developments will make it possible to undertake, with slight modification and enhancements, the work required in the search for sites suitable for the definitive disposal of high-level radioactive wastes. A final section is devoted to presenting an overview of anticipated R and D actions for the five-year period 1995--1999

  2. Project Rio Blanco: site restoration. Final report

    International Nuclear Information System (INIS)

    1978-01-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7,000 foot well in northwestern Colorado. Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975 and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. The activities throughout the restoration period are summarized and the final site status, including the disposition of all project facilities and the status of all project related wells after plug and abandonment and recompletion work are described

  3. Microbial enhanced oil recovery research. Final report, Annex 5

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, M.M.; Gerogiou, G.

    1993-07-01

    The objective of this project was to develop an engineering framework for the exploitation of microorganisms to enhance oil recovery. An order of magnitude analysis indicated that selective plugging and the production of biosurfactants are the two most likely mechanisms for the mobilization of oil in microbial enhanced oil recovery (MEOR). The latter, biosurfactant production, is easier to control within a reservoir environment and was investigated in some detail. An extensive literature survey indicated that the bacterium Bacillus licheniformis JF-2 produces a very effective surface active agent capable of increasing the capillary number to values sufficiently low for oil mobilization. In addition, earlier studies had shown that growth of this bacterium and biosurfactant production occur under conditions that are typically encountered in MEOR, namely temperatures up to 55{degrees}C, lack of oxygen and salinities of up to 10% w/v. The chemical structure of the surfactant, its interfacial properties and its production by fermentation were characterized in some detail. In parallel, a set of experiments as conducted to measure the transport of Bacillus licheniformis JF-2 in sandpacks. It was shown that the determining parameters for cell transport in porous media are: cell size and degree of coagulation, presence of dispersants, injection velocity and cell concentration. The mechanisms of bacteria retention within the pores of the reservoir were analyzed based on heuristic arguments. A mathematical simulator of MEOR was developed using conservation equations in which the mechanisms of bacteria retention and the growth kinetics of the cells were incorporated. The predictions of the model agreed reasonably well with experimental results.

  4. NERSC Strategic Implementation Plan 2002-2006

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  5. Uncertainty in spatial planning proceedings

    Directory of Open Access Journals (Sweden)

    Aleš Mlakar

    2009-01-01

    Full Text Available Uncertainty is distinctive of spatial planning as it arises from the necessity to co-ordinate the various interests within the area, from the urgency of adopting spatial planning decisions, the complexity of the environment, physical space and society, addressing the uncertainty of the future and from the uncertainty of actually making the right decision. Response to uncertainty is a series of measures that mitigate the effects of uncertainty itself. These measures are based on two fundamental principles – standardization and optimization. The measures are related to knowledge enhancement and spatial planning comprehension, in the legal regulation of changes, in the existence of spatial planning as a means of different interests co-ordination, in the active planning and the constructive resolution of current spatial problems, in the integration of spatial planning and the environmental protection process, in the implementation of the analysis as the foundation of spatial planners activities, in the methods of thinking outside the parameters, in forming clear spatial concepts and in creating a transparent management spatial system and also in the enforcement the participatory processes.

  6. Emergency Planning and Preparedness in Belgium

    International Nuclear Information System (INIS)

    Degueldre, D.; Maris, M.

    1998-01-01

    The present Belgian nuclear emergency planning and preparedness is based on experience cumulated since the early eighties. This paper describes the organisation, actuation process, the emergency planning zones and the applicable intervention guidance levels. The role of AVN as on-site inspector, nuclear emergency adviser and emergency assessor is explained as well as its human and technical resources. Finally the paper presents briefly the experience feedback on emergency exercises and training in Belgium as well as AVN's views on some debatable topics. (author)

  7. A new plan-scoring method using normal tissue complication probability for personalized treatment plan decisions in prostate cancer

    Science.gov (United States)

    Kim, Kwang Hyeon; Lee, Suk; Shim, Jang Bo; Yang, Dae Sik; Yoon, Won Sup; Park, Young Je; Kim, Chul Yong; Cao, Yuan Jie; Chang, Kyung Hwan

    2018-01-01

    The aim of this study was to derive a new plan-scoring index using normal tissue complication probabilities to verify different plans in the selection of personalized treatment. Plans for 12 patients treated with tomotherapy were used to compare scoring for ranking. Dosimetric and biological indexes were analyzed for the plans for a clearly distinguishable group ( n = 7) and a similar group ( n = 12), using treatment plan verification software that we developed. The quality factor ( QF) of our support software for treatment decisions was consistent with the final treatment plan for the clearly distinguishable group (average QF = 1.202, 100% match rate, n = 7) and the similar group (average QF = 1.058, 33% match rate, n = 12). Therefore, we propose a normal tissue complication probability (NTCP) based on the plan scoring index for verification of different plans for personalized treatment-plan selection. Scoring using the new QF showed a 100% match rate (average NTCP QF = 1.0420). The NTCP-based new QF scoring method was adequate for obtaining biological verification quality and organ risk saving using the treatment-planning decision-support software we developed for prostate cancer.

  8. Hanford Waste Vitrification Plant Technology Plan

    International Nuclear Information System (INIS)

    Sexton, R.A.

    1988-06-01

    The reference Hanford plan for disposal of defense high-level waste is based on waste immobilization in glass by the vitrification process and temporary vitrified waste storage at the Hanford Site until final disposal in a geologic repository. A companion document to the Hanford Waste Management Plan (HWMP) is the Draft, Interim Hanford Waste Management Technology Plan (HWMTP), which provides a description of the technology that must be developed to meet the reference waste management plan. One of the issues in the HWMTP is DST-6, Immobilization (Glass). The HWMTP includes all expense funding needed to complete the Hanford Waste Vitrification Plant (HWVP) project. A preliminary HWVP Technology Plan was prepared in 1985 as a supporting document to the HWMTP to provide a more detailed description of the technology needed to construct and operate a vitrification facility. The plan was updated and issued in 1986, and revised in 1987. This document is an annual update of the plan. The HWVP Technology Plan is limited in scope to technology that requires development or confirmation testing. Other expense-funded activities are not included. The relationship between the HWVP Technology Plan and other waste management issues addressed in the HWMTP is described in section 1.6 of this plan. 6 refs., 4 figs., 34 tabs

  9. Overview of the Hanford risk management plan

    International Nuclear Information System (INIS)

    Halverson, T.G.

    1998-01-01

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context

  10. Dealing with the three facets of uncertainty in planning: evidences ...

    African Journals Online (AJOL)

    Action theorists go far and envisage planning as a symbolic rationalization of previous choices and, finally the resource-dependence theorists figure planning as a legitimating strategy aiming at increasing credibility and attracting external resources. This article posits that there is a common ground to these apparently ...

  11. Study of the layout plan in the tokamak complex building for ITER

    International Nuclear Information System (INIS)

    Sato, Kazuyoshi; Yagenji, Akira; Sekiya, Shigeki; Takahashi, Hideo; Tamura, Kousaku; Neyatani, Yuzuru; Hashimoto, Masayoshi; Ogino, Shunji; Nagamatsu, Nobuhide; Motohashi, Keiichi; Uehara, Masaharu; Kataoka, Takahiro; Ohashi, Hironori

    2006-03-01

    This report summarizes study of the layout plan in the ITER Tokamak complex building as an invite to set up its plant in Japan. To draw up this arrangement plan, final design report (FDR), which was designed for main components and determined for the non-site specific design, was reconstructed systematically for the Japanese site. A supplementary design was performed for the insufficiency parts of FDR. An additional study was also performed for the adaptation of a regulatory framework including technical safety requirements in Japan. We proposed the tokamak complex building with seismic isolation to combine with the hot cell building. Through the studies, a layout plan has been constructed including maintenance plan for personnel access and component route with in the building from assembly to operation period. This layout plan would be used as a basis in the construction period, although final decision will be done by ITER organization. (author)

  12. Short and long-term career plans of final year dental students in the United Arab Emirates.

    Science.gov (United States)

    Rashid, Hazim H; Ghotane, Swapnil G; Abufanas, Salem H; Gallagher, Jennifer E

    2013-08-13

    New dental schools have been established to train dentists in many parts of the world. This study examines the future dental workforce from the first dental school in the United Arab Emirates [UAE]; the aim of this study was to explore the short and long-term career aspirations of the final year dental students in the UAE in relation to their demography. Final year dental students of the Ajman University's College of Dentistry (n=87) were invited to participate in a self-completion questionnaire survey. Descriptive analysis, chi-square tests, and binary logistic regression analysis were carried out on career aspirations using SPSS v20. Eighty-two percent of students (n=71) responded, the majority of whom were female (65%; n=46). Ethnicity was reported as: 'other Arab' (61%; n=43), 'Emirati' (17%, n=12), and 'Other' (21%, n=15). In the short-term, 41% (n=29) expressed a desire to work in government training centres, with Emirati students significantly more likely to do so (p=0.002). 'Financial stability' (80%; n=57) and 'gaining professional experience' (76%; n=54) emerged as the most important influences on their short-term career plans. The vast majority of students wished to specialise in dentistry (92%; n=65) in the longer term; logistic regression analysis revealed that the odds of specialising in the most popular specialties of Orthodontics and Oral and Maxillofacial Surgery were less for the 'Other' ethnic group when compared with 'Emirati' students (0.26; 95% CI 0.068-0.989; p=0.04). Almost three-quarters of the students overall (72%; n=51) intended to work full-time. 'High income/financial security' (97%; n=69), 'standard of living' (97%; n=69), 'work/life balance' (94%; n=67), and 'professional fulfilment' (87%; n=62) were reported by the students as the most influential items affecting their long-term professional career choices. The findings suggest that students aspire to make a long-term contribution to the profession and there is a high level of

  13. Hanford River Protection Project Enhanced Mission Planning Through Innovative Tools: Lifecycle Cost Modeling And Aqueous Thermodynamic Modeling - 12134

    International Nuclear Information System (INIS)

    Pierson, K.L.; Meinert, F.L.

    2012-01-01

    Two notable modeling efforts within the Hanford Tank Waste Operations Simulator (HTWOS) are currently underway to (1) increase the robustness of the underlying chemistry approximations through the development and implementation of an aqueous thermodynamic model, and (2) add enhanced planning capabilities to the HTWOS model through development and incorporation of the lifecycle cost model (LCM). Since even seemingly small changes in apparent waste composition or treatment parameters can result in large changes in quantities of high-level waste (HLW) and low-activity waste (LAW) glass, mission duration or lifecycle cost, a solubility model that more accurately depicts the phases and concentrations of constituents in tank waste is required. The LCM enables evaluation of the interactions of proposed changes on lifecycle mission costs, which is critical for decision makers.

  14. Safety Culture Enhancement Project. Final Report. A Field Study on Approaches to Enhancement of Safety Culture

    International Nuclear Information System (INIS)

    Lowe, Andrew; Hayward, Brent

    2006-08-01

    This report documents a study with the objective of enhancing safety culture in the Swedish nuclear power industry. A primary objective of this study was to ensure that the latest thinking on human factors principles was being recognised and applied by nuclear power operators as a means of ensuring optimal safety performance. The initial phase of the project was conducted as a pilot study, involving the senior management group at one Swedish nuclear power-producing site. The pilot study enabled the project methodology to be validated after which it was repeated at other Swedish nuclear power industry sites, providing a broad-ranging analysis of opportunities across the industry to enhance safety culture. The introduction to this report contains an overview of safety culture, explains the background to the project and sets out the project rationale and objectives. The methodology used for understanding and analysing the important safety culture issues at each nuclear power site is then described. This section begins with a summary of the processes used in the information gathering and data analysis stage. The six components of the Management Workshops conducted at each site are then described. These workshops used a series of presentations, interactive events and group exercises to: (a) provide feedback to site managers on the safety culture and safety leadership issues identified at their site, and (b) stimulate further safety thinking and provide 'take-away' information and leadership strategies that could be applied to promote safety culture improvements. Section 3, project Findings, contains the main observations and output from the project. These include: - a brief overview of aspects of the local industry operating context that impinge on safety culture; - a summary of strengths or positive attributes observed within the safety culture of the Swedish nuclear industry; - a set of identified opportunities for further improvement; - the aggregated results of the

  15. Study On Safeguard Measures for Implementing Overall Planning of Land Use

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Based on minutely analysing the main problems existing in safeguard measures for implementing a new round of overall planning of land use,this paper constructs implementation security system of overall planning of land use,and puts forward the principles and basis of formulating safeguard measures for implementing overall planning of land use.Finally,this paper establishes the content system of safeguard measures:effectively strengthen social supervision;strengthen administrative management of land use planning;strengthen economic management of land use planning;reinforce the legal status of planning;establish incentive and constraint mechanism for reinforcing implementation;improve support system of planning.

  16. From action planning and plan enactment to fruit consumption: moderated mediation effects.

    Science.gov (United States)

    Kasten, Stefanie; van Osch, Liesbeth; Eggers, Sander Matthijs; de Vries, Hein

    2017-10-23

    Sufficient fruit consumption is beneficial for a healthy live. While many Dutch adults intent to eat the recommended amount of fruit, only 5-10% of the population actually adheres to the recommendation. One mechanism that can help to narrow this gap between intention and actual fruit consumption is action planning. However, action planning is only assumed to be effective if plans are enacted. This study assessed which action plans are made and enacted, and further aimed to investigate two main hypotheses: 1. the effect of action planning (at T1) on fruit consumption (at T2) is mediated by plan enactment (at T3); 2. positive intentions (2a), high self-efficacy (2b) and a strong habit to eat fruit (2c) enhance the mediation of plan enactment, whereas a strong habit to eat snacks (2d) hinders the mediation of plan enactment. This study was a self-reported longitudinal online survey study. A total of 428 participants filled in a survey, measuring demographic factors (e.g. gender, age, education level), several socio-cognitive constructs (i.e. attitudes, self-efficacy, habit, action planning, plan enactment), and fruit consumption, at three points in time (baseline, after 1 month, and after 3 months). Mediation and moderated mediation analyses were used to investigate the planning-plan enactment- fruit consumption relationship. Up to 70% of the participants reported to have enacted their T1 action plans at T2. Action planning on fruit consumption was fully mediated by plan enactment (Hypothesis 1). All four proposed moderators (i.e. intention, self-efficacy, habit to consume fruit, and habit to consume snacks) significantly influenced the mediation (Hypotheses 2a-2d). Mediation of plan enactment was only present with high levels of intention, high levels of self-efficacy, strong habits to eat fruit, and weak habits to eat snacks. The study suggests the importance of plan enactment for fruit consumption. Furthermore, it emphasizes the necessity of facilitating factors

  17. Rethinking enhancement in sport.

    Science.gov (United States)

    Miah, Andy

    2006-12-01

    This article explores the arguments surrounding the use of human enhancement technologies in sport, arguing for a reconceptualization of the doping debate. First, it develops an overview and critique of the legislative structures on enhancement. Subsequently, a conceptual framework for understanding the role of technological effects in sport is advanced. Finally, two case studies (hypoxic chambers and gene transfer) receive specific attention, through which it is argued that human enhancement technologies can enrich the practice of elite sports rather than diminish them. In conclusion, it is argued that elite sports are at a pivotal moment in their history as an increasing range of enhancements makes less relevant the protection of the natural human through anti-doping.

  18. Configuration management plan for Machine Interface Test System (MITS)

    International Nuclear Information System (INIS)

    O'Neill, C.K.

    1980-01-01

    The discipline required by this plan will apply from the establishment of a configuration baseline until completion of the final test in the MITS. The plan applies to configured items of hardware and software as well as to the specifications and drawings for these items. The plan encompasses establishment of the facility baseline, interface definition, classes of change, change control, change paper, organizational responsibilities and relationships, test configuration (as opposed to facility), and configuration data retention

  19. Coupling and corona effects research plan for transmission lines. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Bridges, J E; Formanek, V C

    1976-06-01

    Concern has arisen over the possible effects of electric and magnetic fields produced by EHV-UHV transmission lines. Past and ongoing research concerning the electric and magnetic field effects from EHV-UHV transmission lines was reviewed as it pertains to the following areas: (1) electromagnetic interference, (2) acoustic noise, (3) generation of gaseous effluents, and (4) safety considerations of induced voltages and currents. The intent of this review was to identify the short and long range research projects required to address these areas. The research plan identifies and gives priority to twenty programs in corona and coupling effects. In the case of the corona effects, a number of programs were recommended for acoustic noise and electromagnetic interference to delineate improved power line design criteria in terms of social, meteorological, geographical and cost constraints. Only one project is recommended in the case of ozone generation, because the results of comprehensive analyses, laboratory studies and field measurements have demonstrated that power lines do not contribute significant quantities of ozone. In the case of the coupling effects, a number of programs are recommended for HVAC transmission lines to improve the theoretically developed design guidelines by considering practical constraints. For HVDC transmission lines, programs are suggested to engender a better theoretical understanding and practical measurements capability for the coupling mechanisms of the dc electric and magnetic field with nearby objects. The interrelationship of the programs and their role in a long-term research plan is also discussed.

  20. Preliminary plan for decommissioning - repository for spent nuclear fuel; Preliminaer plan foer avveckling - slutfoervar foer anvaent kaernbraensle

    Energy Technology Data Exchange (ETDEWEB)

    Hallberg, Bengt; Tiberg, Liselotte (Studsvik Nuclear AB, Nykoeping (Sweden))

    2010-06-15

    The final disposal facility for spent nuclear fuel is part of the KBS-3 system, which also consists of a central facility for interim storage and encapsulation of the spent nuclear fuel and a transport system. The nuclear fuel repository will be a nuclear facility. Regulation SSMFS 2008:1 (Swedish Radiation Safety Authority's regulations on safety of nuclear facilities) requires that the licensee must have a current decommissioning plan throughout the facility lifecycle. Before the facility is constructed, a preliminary decommissioning plan should be reported to the Swedish Radiation Safety Authority. This document is a preliminary decommissioning plan, and submitted as an attachment to SKB's application for a license under the Nuclear Activities Act to construct, own and operate the facility. The final disposal facility for spent nuclear fuel consists of an above ground part and a below ground part and will be built near Forsmark and the final repository for radioactive operational waste, SFR. The parts above and below ground are connected by a ramp and several shafts, e.g. for ventilation. The below ground part consists of a central area, and several landfill sites. The latter form the repository area. The sealed below ground part constitutes the final repository. The decommissioning is taking place after the main operation has ended, that is, when all spent nuclear fuel has been deposited and the deposition tunnels have been backfilled and plugged. The decommissioning involves sealing of the remaining parts of the below ground part and demolition of above ground part. When decommissioning begins, there will be no contamination in the facility. The demolition is therefore performed as for a conventional plant. Demolition waste is sorted and recycled whenever possible or placed in landfill. Hazardous waste is managed in accordance with current regulations. A ground investigation is performed and is the basis for after-treatment of the site. The timetable

  1. Sodium-Bearing Waste Treatment, Applied Technology Plan

    International Nuclear Information System (INIS)

    Lance Lauerhass; Vince C. Maio; S. Kenneth Merrill; Arlin L. Olson; Keith J. Perry

    2003-01-01

    Settlement Agreement between the Department of Energy and the State of Idaho mandates treatment of sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center within the Idaho National Engineering and Environmental Laboratory. One of the requirements of the Settlement Agreement is to complete treatment of sodium-bearing waste by December 31, 2012. Applied technology activities are required to provide the data necessary to complete conceptual design of four identified alternative processes and to select the preferred alternative. To provide a technically defensible path forward for the selection of a treatment process and for the collection of needed data, an applied technology plan is required. This document presents that plan, identifying key elements of the decision process and the steps necessary to obtain the required data in support of both the decision and the conceptual design. The Sodium-Bearing Waste Treatment Applied Technology Plan has been prepared to provide a description/roadmap of the treatment alternative selection process. The plan details the results of risk analyzes and the resulting prioritized uncertainties. It presents a high-level flow diagram governing the technology decision process, as well as detailed roadmaps for each technology. The roadmaps describe the technical steps necessary in obtaining data to quantify and reduce the technical uncertainties associated with each alternative treatment process. This plan also describes the final products that will be delivered to the Department of Energy Idaho Operations Office in support of the office's selection of the final treatment technology

  2. Sodium-Bearing Waste Treatment, Applied Technology Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lance Lauerhass; Vince C. Maio; S. Kenneth Merrill; Arlin L. Olson; Keith J. Perry

    2003-06-01

    Settlement Agreement between the Department of Energy and the State of Idaho mandates treatment of sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center within the Idaho National Engineering and Environmental Laboratory. One of the requirements of the Settlement Agreement is to complete treatment of sodium-bearing waste by December 31, 2012. Applied technology activities are required to provide the data necessary to complete conceptual design of four identified alternative processes and to select the preferred alternative. To provide a technically defensible path forward for the selection of a treatment process and for the collection of needed data, an applied technology plan is required. This document presents that plan, identifying key elements of the decision process and the steps necessary to obtain the required data in support of both the decision and the conceptual design. The Sodium-Bearing Waste Treatment Applied Technology Plan has been prepared to provide a description/roadmap of the treatment alternative selection process. The plan details the results of risk analyzes and the resulting prioritized uncertainties. It presents a high-level flow diagram governing the technology decision process, as well as detailed roadmaps for each technology. The roadmaps describe the technical steps necessary in obtaining data to quantify and reduce the technical uncertainties associated with each alternative treatment process. This plan also describes the final products that will be delivered to the Department of Energy Idaho Operations Office in support of the office's selection of the final treatment technology.

  3. An investigation of the effect of changes of planning criteria on power system expansion planning with a case study of the Jordanian power system

    International Nuclear Information System (INIS)

    Elkarmi, Fawwaz; Abu-Shikhah, Nazih; Abu-Zarour, Mohammad

    2010-01-01

    Many factors contribute to the planning process of power systems. In the context of expansion planning, focus is paid to selection criteria that enable the optimization of related factors that will result in the best performance. This is described as meeting demand whilst reducing costs and maintaining minimal risk in operation. In this paper, different criteria used in the planning of power system expansion studies are investigated with the objective of identifying their impact on the expansion plan. The results of these criteria on the expansion study of the Jordanian power system are presented. Results show good correspondence to the actual adopted solutions. The spinning reserve is the most influential planning criterion on the overall system expansion cost. This is followed by the peak load changes, and the forced outage rate of the candidate units used for capacity additions to meet future expected demand. Finally, the loss of load expectation and cost of energy not served have the least effect on the overall system expansion cost. These results highlight the importance to be placed on performing sensitivity analyses to determine the most cost effective and acceptable expansion plan of the electric power system. There is a need to continually update the planning criteria to cater for changes and developments in the power system and the economic situation. Finally, the methodology of this study can be generalized to other power systems.

  4. An investigation of the effect of changes of planning criteria on power system expansion planning with a case study of the Jordanian power system

    Energy Technology Data Exchange (ETDEWEB)

    Elkarmi, Fawwaz; Abu-Shikhah, Nazih [Al-Ahliyya Amman University, College of Engineering, AA University Post Office, Zip code 19328 (Jordan); Abu-Zarour, Mohammad [NEPCO, Department of Generation Planning, P.O. Box 2310, Amman 11194 (Jordan)

    2010-10-15

    Many factors contribute to the planning process of power systems. In the context of expansion planning, focus is paid to selection criteria that enable the optimization of related factors that will result in the best performance. This is described as meeting demand whilst reducing costs and maintaining minimal risk in operation. In this paper, different criteria used in the planning of power system expansion studies are investigated with the objective of identifying their impact on the expansion plan. The results of these criteria on the expansion study of the Jordanian power system are presented. Results show good correspondence to the actual adopted solutions. The spinning reserve is the most influential planning criterion on the overall system expansion cost. This is followed by the peak load changes, and the forced outage rate of the candidate units used for capacity additions to meet future expected demand. Finally, the loss of load expectation and cost of energy not served have the least effect on the overall system expansion cost. These results highlight the importance to be placed on performing sensitivity analyses to determine the most cost effective and acceptable expansion plan of the electric power system. There is a need to continually update the planning criteria to cater for changes and developments in the power system and the economic situation. Finally, the methodology of this study can be generalized to other power systems. (author)

  5. 77 FR 35873 - Approval, Disapproval and Promulgation of Air Quality Implementation Plan; Utah; Maintenance Plan...

    Science.gov (United States)

    2012-06-15

    ... provisions; (3) removal of budgets for sources other than on-road mobile sources; (4) changes to the trigger... removal from the maintenance plan of the budgets for area, on-road mobile, and point sources. D. Section... Standard for Salt Lake and Davis Counties AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule...

  6. Yakima River Spring Chinook Enhancement Study, 1991 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fast, David E.

    1991-05-01

    The population of Yakima River spring chinook salmon (Oncorhynchus tschawytscha) has been drastically reduced from historic levels reported to be as high as 250,000 adults (Smoker 1956). This reduction is the result of a series of problems including mainstem Columbia dams, dams within the Yakima itself, severely reduced flows due to irrigation diversions, outmigrant loss in irrigation canals, increased thermal and sediment loading, and overfishing. Despite these problems, the return of spring chinook to the Yakima River has continued at levels ranging from 854 to 9,442 adults since 1958. In October 1982, the Bonneville Power Administration contracted the Yakima Indian Nation to develop methods to increase production of spring chinook in the Yakima system. The Yakima Nation's current enhancement policy attempts to maintain the genetic integrity of the spring chinook stock native to the Yakima Basin. Relatively small numbers of hatchery fish have been released into the basin in past years. The goal of this study was to develop data that will be used to present management alternatives for Yakima River spring chinook. A major objective of this study is to determine the distribution, abundance and survival of wild Yakima River spring chinook. The second major objective of this study is to determine the relative effectiveness of different methods of hatchery supplementation. The last three major objectives of the study are to locate and define areas in the watershed that may be used for the rearing of spring chinook; to define strategies for enhancing natural production of spring chinook in the Yakima River; and to determine the physical and biological limitations on production within the system. 47 refs., 89 figs., 67 tabs.

  7. Contingency planning in southern Africa: Events rather than processes?

    OpenAIRE

    Elias Mabaso; Siambabala B. Manyena

    2013-01-01

    With the increasing frequency, magnitude and impact of disasters, there is growing focus on contingency planning as a tool for enhancing resilience. Yet, there is little empirical evidence that reflects on the practice of contingency planning systems within the context of disaster risk reduction. This article explores the practice of contingency planning in southern Africa, focussing on Malawi, Mozambique, Namibia, Zambia and Zimbabwe. A qualitative comparative analysis informed by fieldwork ...

  8. Aerocapacitor commercialization plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-12

    The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

  9. Towards future electricity networks - Final report

    Energy Technology Data Exchange (ETDEWEB)

    Papaemmanouil, A.

    2008-07-01

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) reviews work done on the development of new power transmission planning tools for restructured power networks. These are needed in order to face the challenges that arise due to economic, environmental and social issues. The integration of transmission, generation and energy policy planning in order to support a common strategy with respect to sustainable electricity networks is discussed. In the first phase of the project the main focus was placed on the definition of criteria and inputs that are most likely to affect sustainable transmission expansion plans. Models, concepts, and methods developed in order to study the impact of the internalisation of external costs in power production are examined. To consider external costs in the planning process, a concurrent software tool has been implemented that is capable of studying possible development scenarios. The report examines a concept that has been developed to identify congested transmission lines or corridors and evaluates the dependencies between the various market participants. The paper includes a set of three appendices that include a paper on the 28{sup th} USAEE North American conference, an abstract from Powertech 2009 and an SFOE report from July 2008.

  10. Towards future electricity networks - Final report

    International Nuclear Information System (INIS)

    Papaemmanouil, A.

    2008-01-01

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) reviews work done on the development of new power transmission planning tools for restructured power networks. These are needed in order to face the challenges that arise due to economic, environmental and social issues. The integration of transmission, generation and energy policy planning in order to support a common strategy with respect to sustainable electricity networks is discussed. In the first phase of the project the main focus was placed on the definition of criteria and inputs that are most likely to affect sustainable transmission expansion plans. Models, concepts, and methods developed in order to study the impact of the internalisation of external costs in power production are examined. To consider external costs in the planning process, a concurrent software tool has been implemented that is capable of studying possible development scenarios. The report examines a concept that has been developed to identify congested transmission lines or corridors and evaluates the dependencies between the various market participants. The paper includes a set of three appendices that include a paper on the 28 th USAEE North American conference, an abstract from Powertech 2009 and an SFOE report from July 2008.

  11. Washoe Tribe Nevada Inter-Tribal Energy Consortium Energy Organization Enhancement Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Jennifer [Washoe Tribe of NV and Ca

    2014-11-06

    The Washoe Tribe of Nevada and California was awarded funding from the Department of Energy to complete the Nevada Inter-Tribal Energy Consortium Energy Organization Enhancement Project. The main goal of the project was to enhance the capacity of the Nevada Inter-Tribal Energy Consortium (NITEC) to effectively assist tribes within Nevada to technically manage tribal energy resources and implement tribal energy projects.

  12. Environmental considerations in mine closure planning

    International Nuclear Information System (INIS)

    Ricks, G.

    1997-01-01

    Mine closure planning considers the best ways to plan and manage the environmental changes and socio-economic effects associated with the closing of mines. While the criteria for judging successful closures may vary, it is particularly important for physical, chemical and biological stability to be achieved and for final land use to be appropriate. Trust funds are increasingly favoured as a practical means of fulfilling the requirement for a financial surety and of ensuring that financial provision is available at the end of the mine's life. (author)

  13. LIGHT RAIL TRANSIT AND LAND USE IN QATAR: AN INTEGRATED PLANNING STRATEGY FOR AL-QASSAR’S TOD

    Directory of Open Access Journals (Sweden)

    Raffaello Furlan

    2016-11-01

    Full Text Available The State of Qatar is presently facing the development of major transport infrastructure, to be finalized (A by 2022 for the planned FIFA World Cup and (B by 2030, as envisioned by the comprehensive national development planning strategy, also named Qatar National Vision (QNV-2030. The under-development metro system foresees the construction of four main lines. In addition, Doha, the capital city of the State of Qatar, is experiencing the progress of (1 prestigious mega projects and (2 several transit villages around the major metro stations. These projects are the manifestation of the deliberate attempt of Qatar to establish Doha as the service, economic and cultural hub of Middle East. Currently, traffic is considered a major concern: ‘Park-and-Ride’ facilities along train stations may reduce the general amount of vehicles on the road network and provide a ‘stress-free’ passenger experience when transitioning to and from the new Doha Metro System. Therefore, one of major challenges for urban planners is guaranteeing that all metro-stations and facilities (A are fully integrated within the urban context of their surroundings and (B provide multi modal transportation facilities. This urban planning strategy aims at reducing traffic through the design of compacted, mixed used transit villages, or Transit Oriented Developments (TODs. This paper explores the case of the neighborhood of Al-Qassar metro station. The exploration starts with the review of the relevant literature and the analysis of the site. Finally, the resultant planning-strategy for an integrated conceptual development of AL-Qassar-TOD envisions the development of a compact transit village, which contributes to reduce the traffic, to enhance pedestrian connectivity and to shape a liveable community.

  14. Planning the diffusion of a neck-injury prevention programme among community rugby union coaches.

    Science.gov (United States)

    Donaldson, Alex; Poulos, Roslyn G

    2014-01-01

    This paper describes the development of a theory-informed and evidence-informed, context-specific diffusion plan for the Mayday Safety Procedure (MSP) among community rugby coaches in regional New South Wales, Australia. Step 5 of Intervention Mapping was used to plan strategies to enhance MSP adoption and implementation. Coaches were identified as the primary MSP adopters and implementers within a system including administrators, players and referees. A local advisory group was established to ensure context relevance. Performance objectives (eg, attend MSP training for coaches) and determinants of adoption and implementation behaviour (eg, knowledge, beliefs, skills and environment) were identified, informed by Social Cognitive Theory. Adoption and implementation matrices were developed and change-objectives for coaches were identified (eg, skills to deliver MSP training to players). Finally, intervention methods and specific strategies (eg, coach education, social marketing and policy and by-law development) were identified based on advisory group member experience, evidence of effective coach safety behaviour-change interventions and Diffusion of Innovations theory. This is the first published example of a systematic approach to plan injury prevention programme diffusion in community sports. The key strengths of this approach were an effective researcher-practitioner partnership; actively engaging local sports administrators; targeting specific behaviour determinants, informed by theory and evidence; and taking context-related practical strengths and constraints into consideration. The major challenges were the time involved in using a systematic diffusion planning approach for the first time; and finding a planning language that was acceptable and meaningful to researchers and practitioners.

  15. Advance care planning in a community setting.

    Science.gov (United States)

    Connolly, Josaleen; Milligan, Stuart; Stevens, Elaine; Jackson, Susan; Rooney, Kevin

    2015-02-10

    To evaluate the effects of implementing an advance care planning process within pilot sites in North Ayrshire in 2010, focusing on people with palliative care needs. Data were collected from participants in advance care planning training using a questionnaire. Semi-structured interviews were conducted and an audit of documentation was undertaken. Thirty nine questionnaires were returned, a response rate of 16%. Twenty four out of 25 (96%) participants rated the training as having improved their understanding of the advance care planning process. The general consensus in interviews was that advance care planning is a worthwhile process. Participants reported patients achieving their preferred place of end of life care and greater consultation regarding hospitalisation. Within the pilot sites, advance care planning training enhanced the ability of professionals to implement the advance care planning process and record the wishes of patients and residents.

  16. [The role of Sabin inactivated poliovirus vaccine in the final phase of global polio eradication].

    Science.gov (United States)

    Dong, S Z; Zhu, W B

    2016-12-06

    Global polio eradication has entered its final phase, but still faces enormous challenges. The Polio Eradication and Endgame Strategic Plan (2013-2018) set the target for making the world polio-free by 2018. Meanwhile, the World Heath Organization Global Action Plan (GAP Ⅲ) recommended that polioviruses be stored under strict conditions after eradication of the wild poliovirus. At least one dose of inactivated poliovirus vaccine (IPV) would be required for each newborn baby in the world to ensure successful completion of the final strategy and GAP Ⅲ. The Sabin IPV has a high production safety and low production cost, compared with the wild-virus IPV and, therefore, can play an important role in the final stage of global polio eradication.

  17. ADVANCED TECHNOLOGIES FOR STRIPPER GAS WELL ENHANCEMENT

    International Nuclear Information System (INIS)

    Charles M. Boyer II; Ronald J. MacDonald P.G.

    2001-01-01

    As part of Task 1 in Advanced Technologies for Stripper Gas Well Enhancement, Schlumberger-Holditch Reservoir Technologies (H-RT) has joined with two Appalachian Basin producers, Great Lakes Energy Partners, LLC, and Belden and Blake Corporation to develop methodologies for identification and enhancement of stripper wells with economic upside potential. These industry partners have provided us with data for more than 700 wells in northwestern Pennsylvania. Phase 1 goals of this project are to develop and validate methodologies that can quickly and cost-effectively identify wells with enhancement potential. We have continued to enhance and streamline our software, and we are testing the final stages of our new Microsoft(trademark) Access/Excel based software. We are continuing to process this well data and are identifying potential candidate wells that can be used in Phase 2 to validate the new methodologies. In addition, preparation of the final technical report is underway

  18. Context and meter enhance long-range planning in music performance

    Directory of Open Access Journals (Sweden)

    Brian eMathias

    2015-01-01

    Full Text Available Neural responses demonstrate evidence of resonance, or oscillation, during the production of periodic auditory events. Music contains periodic auditory events that give rise to a sense of beat, which in turn generates a sense of meter on the basis of multiple periodicities. Metrical hierarchies may aid memory for music by facilitating similarity-based associations among sequence events at different periodic distances that unfold in longer contexts. A fundamental question is how metrical associations arising from a musical context influence memory during music performance. Longer contexts may facilitate metrical associations at higher hierarchical levels more than shorter contexts, a prediction of the range model, a formal model of planning processes in music performance (Palmer and Pfordresher, 2003; Pfordresher et al., 2007. Serial ordering errors, in which intended sequence events are produced in incorrect sequence positions, were measured as skilled pianists performed musical pieces that contained excerpts embedded in long or short musical contexts. Pitch errors arose from metrically similar positions and further sequential distances more often when the excerpt was embedded in long contexts compared to short contexts. Musicians’ keystroke intensities and error rates also revealed influences of metrical hierarchies, which differed for performances in long and short contexts. The range model accounted for contextual effects and provided better fits to empirical findings when metrical associations between sequence events were included. Longer sequence contexts may facilitate planning during sequence production by increasing conceptual similarity between hierarchically associated events. These findings are consistent with the notion that neural oscillations at multiple periodicities may strengthen metrical associations across sequence events during planning.

  19. "SABER": A new software tool for radiotherapy treatment plan evaluation.

    Science.gov (United States)

    Zhao, Bo; Joiner, Michael C; Orton, Colin G; Burmeister, Jay

    2010-11-01

    Both spatial and biological information are necessary in order to perform true optimization of a treatment plan and for predicting clinical outcome. The goal of this work is to develop an enhanced treatment plan evaluation tool which incorporates biological parameters and retains spatial dose information. A software system is developed which provides biological plan evaluation with a novel combination of features. It incorporates hyper-radiosensitivity using the induced-repair model and applies the new concept of dose convolution filter (DCF) to simulate dose wash-out effects due to cell migration, bystander effect, and/or tissue motion during treatment. Further, the concept of spatial DVH (sDVH) is introduced to evaluate and potentially optimize the spatial dose distribution in the target volume. Finally, generalized equivalent uniform dose is derived from both the physical dose distribution (gEUD) and the distribution of equivalent dose in 2 Gy fractions (gEUD2) and the software provides three separate models for calculation of tumor control probability (TCP), normal tissue complication probability (NTCP), and probability of uncomplicated tumor control (P+). TCP, NTCP, and P+ are provided as a function of prescribed dose and multivariable TCP, NTCP, and P+ plots are provided to illustrate the dependence on individual parameters used to calculate these quantities. Ten plans from two clinical treatment sites are selected to test the three calculation models provided by this software. By retaining both spatial and biological information about the dose distribution, the software is able to distinguish features of radiotherapy treatment plans not discernible using commercial systems. Plans that have similar DVHs may have different spatial and biological characteristics and the application of novel tools such as sDVH and DCF within the software may substantially change the apparent plan quality or predicted plan metrics such as TCP and NTCP. For the cases examined

  20. 76 FR 62439 - Savannah National Wildlife Refuge Complex, GA and SC; Final Comprehensive Conservation Plan and...

    Science.gov (United States)

    2011-10-07

    ... the comments we received and based on the professional judgment of the planning team, we selected... associated with long-term climate change and sea level rise. We will more aggressively manage invasive and exotic plant species by implementing a management plan, completing a baseline inventory, supporting...

  1. EMI Architecture and Technology Development Plan

    CERN Document Server

    Balazs, K.

    2013-01-01

    This document provides a brief overview of the EMI architecture and the technology development directions presented by the four EMI technology areas and by EMI partners. The report represents the final revision of EMI technology planning covering a time period beyond the project end.

  2. IT strategic planning in hospitals: from theory to practice.

    Science.gov (United States)

    Jaana, Mirou; Teitelbaum, Mari; Roffey, Tyson

    2014-07-01

    To date, IT strategic planning has been mostly theory-based with limited information on "best practices" in this area. This study presents the process and outcomes of IT strategic planning undertaken at a pediatric hospital (PH) in Canada. A five-stage sequential and incremental process was adopted. Various tools / approaches were used including review of existing documentation, internal survey (n = 111), fifteen interviews, and twelve workshops. IT strategic planning was informed by 230 individuals (12 percent of hospital community) and revealed consistency in the themes and concerns raised by participants (e.g., slow IT projects delivery rate, lack of understanding of IT priorities, strained communication with IT staff). Mobile and remote access to patients' information, and an integrated EMR were identified as top priorities. The methodology and used approach revealed effective, improved internal relationships, and ensured commitment to the final IT strategic plan. Several lessons were learned including: maintaining a dynamic approach capable of adapting to the fast technology evolution; involving stakeholders and ensuring continuous communication; using effective research tools to support strategic planning; and grounding the process and final product in existing models. This study contributes to the development of "best practices" in IT strategic planning, and illustrates "how" to apply the theoretical principles in this area. This is especially important as IT leaders are encouraged to integrate evidence-based management into their decision making and practices. The methodology and lessons learned may inform practitioners in other hospitals planning to engage in IT strategic planning in the future.

  3. Gap analysis between provisional diagnosis and final diagnosis in government and private teaching hospitals: A record-linked comparative study

    Directory of Open Access Journals (Sweden)

    Sudeshna Chatterjee

    2016-01-01

    Full Text Available Aims: 1. To identify the extent of clinical gaps at the context of knowledge, practice and systems. 2. To formulate necessary intervention measures towards bridging the gaps. Settings and Design: Comparative, cross-sectional and non-interventional study. Methods and Material: It is retrospective, record-based study conducted upon inpatients (n = 200 of major disciplines of two teaching hospitals. Major outcome variables were to observe the matching and un-matching of final and provisional diagnosis by using ICD-10 criteria. Statistical Analysis Used: Comparative analysis of specific and selective gaps were estimated in terms of percentage (%. Results: Pilot observation showed the existence of gaps between provisional and final diagnosis in both private and government institution. Both knowledge and skill gaps were evident in caregivers and gap in documentation was existent in medical records. Conclusions: The pilot data is may be an eye-opener to public and private governance systems for understanding and revising the process service planning and service delivery. Necessary intervention measures may be contemplated towards enhancing diagnostic skill of doctors for quality hospital care.

  4. Northeast Oregon Hatchery Project, Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  5. Influence of intravenous contrast agent on dose calculations of intensity modulated radiation therapy plans for head and neck cancer

    International Nuclear Information System (INIS)

    Choi, Youngmin; Kim, Jeung-Kee; Lee, Hyung-Sik; Hur, Won-Joo; Hong, Young-Seoub; Park, Sungkwang; Ahn, Kijung; Cho, Heunglae

    2006-01-01

    Background and purpose: To evaluate the effect of an intravenous contrast agent (CA) on dose calculations and its clinical significance in intensity modulated radiation therapy (IMRT) plans for head and neck cancer. Materials and methods: Fifteen patients with head and neck cancer and involved neck nodes were enrolled. Each patient took two sets of computerized tomography (CT) in the same position before and after intravenous CA injections. Target volumes and organs at risk (OAR) were contoured on the enhanced CT, and then an IMRT plan of nine equiangular beams with a 6 MV X-ray was created. After the fusion of non-enhanced and enhanced CTs, the contours and the IMRT plan created from the enhanced CT were copied and placed to the non-enhanced CT. Doses were calculated again from the non-enhanced CT by the same IMRT plan. The radiation doses calculated from the two sets of CTs were compared with regard to planning target volumes (PTV) and the three OARs, both parotid glands and the spinal cord, by Wilcoxon's signed rank test. Results: The doses (maximum, mean, and the dose of 95% of PTV received (D 95% )) of PTV70 and PTV59.4 calculated from the enhanced CTs were lower than those from the non-enhanced CTs (p < 0.05), but the dose differences were less than 1% compared to the doses calculated from the enhanced CTs. The doses of PTV50.4, parotid glands, and spinal cord were not significantly different between the non-enhanced and enhanced CTs. Conclusions: The difference between the doses calculated from the CTs with and without CA enhancement was tolerably small, therefore using intravenous CA could be recommended for the planning CT of head and neck IMRT

  6. Amendments to excepted benefits. Final rules.

    Science.gov (United States)

    2014-10-01

    This document contains final regulations that amend the regulations regarding excepted benefits under the Employee Retirement Income Security Act of 1974, the Internal Revenue Code (the Code), and the Public Health Service Act. Excepted benefits are generally exempt from the health reform requirements that were added to those laws by the Health Insurance Portability and Accountability Act and the Patient Protection and Affordable Care Act. In addition, eligibility for excepted benefits does not preclude an individual from eligibility for a premium tax credit under section 36B of the Code if an individual chooses to enroll in coverage under a Qualified Health Plan through an Affordable Insurance Exchange. These regulations finalize some but not all of the proposed rules with minor modifications; additional guidance on limited wraparound coverage is forthcoming.

  7. Phase-based Planning for Railway Infrastructure Projects

    DEFF Research Database (Denmark)

    Li, Rui

    2017-01-01

    is important in terms of economy and rail operations. This study presents two types of Phase-based Decision Support System (PDSS), i.e. Functional Phase-Based Planning Approach (F-PBPA) and Process-Oriented Phase-Based Planning Approach (PO-PBPA). They are used for decision support for the planning...... of the railway infrastructure maintenance activities at the strategic planning level. The objective is to achieve better economy, as well as improve cost efficiency. F-PBPA consists of ve main phases: Data Collection, Technical Optimization (TeO), Economic Optimization (EcO), Constrained Optimization (Co...... the costs. Finally, constrained optimization (CoO) includes additional constraints and it allows the railway expert to adjust input parameters, thereby to obtain alternative maintenance plans. PO-PBPA contains another systematic phase based process. With a focus on Life Cycle Cost (LCC), PO-PBPA can guide...

  8. Planning a World Wide Web based design computer system supporting a collaborative design process

    DEFF Research Database (Denmark)

    Sørensen, Lars Schiøtt

    1996-01-01

    An early planning of a WWW-based CAD-system is the major of this publication. Different approaches are discussed and the final "solution" for the system is described in a general way.......An early planning of a WWW-based CAD-system is the major of this publication. Different approaches are discussed and the final "solution" for the system is described in a general way....

  9. 75 FR 51479 - Notice of Availability of the Final Environmental Impact Statement for the Chevron Energy...

    Science.gov (United States)

    2010-08-20

    ... Solutions/Solar Millennium Blythe Solar Power Plant and Proposed California Desert Conservation Area Plan... Proposed California Desert Conservation Area (CDCA) Plan Amendment/Final Environmental Impact Statement... impacts of the project on air quality, biological resources, cultural resources, water resources...

  10. Marketing planning by learning: "Plearning" approach

    Directory of Open Access Journals (Sweden)

    Ilić Milovan M.

    2006-01-01

    Full Text Available This work emphasizes that the final outcome of planning is not only the benefit of having the ready plan but showing that the very process of planning through which a business goes through, is important. Here we consider the process of learning in order to get a complete picture of current and future business processes. Three stages of learning are included. The first stage describes the current position of the business; the second stage describes the position of the business in the future and the last stage shows how the business will achieve these objectives. The focus of planning should be deciding on internal communication which form the basis for gaining the competitive advantage. One of the ways for carrying out this analysis is creating the matrix based on gaining competitive advantage through using resources.

  11. 76 FR 46621 - Group Health Plans and Health Insurance Issuers Relating to Coverage of Preventive Services Under...

    Science.gov (United States)

    2011-08-03

    ... to the interim final regulations implementing the rules for group health plans and health insurance... dates. These interim final regulations generally apply to group health plans and group health insurance... from HHS on private health insurance for consumers can be found on the Centers for Medicare & Medicaid...

  12. An Examination of Family Physicians Plan Implementation in Rural ...

    African Journals Online (AJOL)

    Background: Family physician plan (FPP) and referral system (RS) is one of the major plans in Iran's health system with the aim of increasing the accountability in the health market, enhancing the public's access to the health services, lowering the unnecessary costs and equitable distribution of health across the society.

  13. Task Group on Safety Margins Action Plan (SMAP). Safety Margins Action Plan - Final Report

    International Nuclear Information System (INIS)

    Hrehor, Miroslav; Gavrilas, Mirela; Belac, Josef; Sairanen, Risto; Bruna, Giovanni; Reocreux, Michel; Touboul, Francoise; Krzykacz-Hausmann, B.; Park, Jong Seuk; Prosek, Andrej; Hortal, Javier; Sandervaag, Odbjoern; Zimmerman, Martin

    2007-01-01

    The international nuclear community has expressed concern that some changes in existing plants could challenge safety margins while fulfilling all the regulatory requirements. In 1998, NEA published a report by the Committee on Nuclear Regulatory Activities on Future Nuclear Regulatory Challenges. The report recognized 'Safety margins during more exacting operating modes' as a technical issue with potential regulatory impact. Examples of plant changes that can cause such exacting operating modes include power up-rates, life extension or increased fuel burnup. In addition, the community recognized that the cumulative effects of simultaneous changes in a plant could be larger than the accumulation of the individual effects of each change. In response to these concerns, CSNI constituted the safety margins action plan (SMAP) task group with the following objectives: 'To agree on a framework for integrated assessments of the changes to the overall safety of the plant as a result of simultaneous changes in plant operation / condition; To develop a CSNI document which can be used by member countries to assess the effect of plant change on the overall safety of the plant; To share information and experience.' The two approaches to safety analysis, deterministic and probabilistic, use different methods and have been developed mostly independently of each other. This makes it difficult to assure consistency between them. As the trend to use information on risk (where the term risk means results of the PSA/PRA analysis) to support regulatory decisions is growing in many countries, it is necessary to develop a method of evaluating safety margin sufficiency that is applicable to both approaches and, whenever possible, integrated in a consistent way. Chapter 2 elaborates on the traditional view of safety margins and the means by which they are currently treated in deterministic analyses. This chapter also discusses the technical basis for safety limits as they are used today

  14. The Past, Present, and Future of Discharge Planning in Taiwan

    Directory of Open Access Journals (Sweden)

    Shu-Chuan Lin

    2013-06-01

    Full Text Available Discharge planning is an interdisciplinary approach to provide continuity of care; it is a process that includes identification, assessment, goal setting, planning, implementation, coordination, and evaluation. Discharge planning has been viewed as a major way to enhance a smooth transition for patients from the hospital to home or other chronic care units and as a solution to solve problems associated with postdischarge care. The promotion of discharge planning began in the United States in the 1960s. Nursing scholars from Taiwan learned about the concept of discharge planning from the United States in the early 1980s and subsequently introduced it to Taiwanese medical institutions in 1985. A policy to promote discharge planning in Taiwan was announced by the Executive Yuan, Department of Health in 1993. Following the healthcare reforms in 1995, discharge planning has since been strongly promoted. Studies concerning discharge planning in Taiwan showed some promising results, including increased satisfaction of patients and their families, improved preparation of caregivers, and improved quality of life for patients. However, patients receiving interdisciplinary discharge planning services were still in the minority. There was no standard evaluation procedure for interdisciplinary discharge planning, and a high percentage of patients thought that hospitals handled the postdischarge long-term care services referral procedure inadequately. Despite the positive attitudes toward discharge planning, many physicians still demonstrate an unsatisfactory level of knowledge and behaviors with regard to discharge planning. To enhance the implementation of discharge planning, a standard evaluation procedure for interdisciplinary discharge planning and improved physician awareness concerning the importance of discharge planning are needed. In Taiwan, the improvement of discharge planning in the foreseeable future is promising with the accreditation of the

  15. Diagnosis of Peripheral Lung Lesions via Conventional Flexible Bronchoscopy with Multiplanar CT Planning

    Directory of Open Access Journals (Sweden)

    Marianne Anastasia De Roza

    2016-01-01

    Full Text Available Background. Conventional flexible bronchoscopy has limited sensitivity in the diagnosis of peripheral lung lesions and is dependent on lesion size. However, advancement of CT imaging offers multiplanar reconstruction facilitating enhanced preprocedure planning. This study aims to report efficacy and safety while considering the impact of patient selection and multiplanar CT planning. Method. Prospective case series of patients with peripheral lung lesions suspected of having lung cancer who underwent flexible bronchoscopy (forceps biopsy and lavage. Endobronchial lesions were excluded. Patients with negative results underwent CT-guided transthoracic needle aspiration, surgical biopsy, or clinical-radiological surveillance to establish the final diagnosis. Results. 226 patients were analysed. The diagnostic yield of bronchoscopy was 80.1% (181/226 with a sensitivity of 84.2% and specificity of 100%. In patients with a positive CT-Bronchus sign, the diagnostic yield was 82.4% compared to 72.8% with negative CT-Bronchus sign (p=0.116. Diagnostic yield was 84.9% in lesions > 20 mm and 63.0% in lesions ≤ 20 mm (p=0.001. Six (2.7% patients had transient hypoxia and 2 (0.9% had pneumothorax. There were no serious adverse events. Conclusion. Flexible bronchoscopy with appropriate patient selection and preprocedure planning is more efficacious in obtaining a diagnosis in peripheral lung lesions compared to historical data. This trial is registered with ClinicalTrials.gov Identifier: NCT01374542.

  16. 1998 Army Modernization Plan

    Science.gov (United States)

    1998-01-01

    Biological (CB) Protective Duty Uniform (STO) • Biometrics (SRO) • Nanoscience (SRO) • Millimeter Wave Material and Dissemination Technology... Biometrics and Nanoscience SROs will enable the development of advanced NBC detection and characterization systems, including the exploitation of biologically...Requirements Trailers • Procure HEMAT Trailers Figure K-23 K-19 //;<?. U.S. Army 1997Modernization Plan This final fleet assessment, made against the

  17. PSSD - Planning System for Sustainable Development

    DEFF Research Database (Denmark)

    PSSD - Planning System for Sustainable Development - is a part of the Baltic Sea Region's INTERREG II C program. The current report describes some theories, methods and tools developed under the PSSD project. First, the theoretical foundation of the project is described. Secondly, the role...... of indicators in sustainable development is discussed and a Web-based indicator generator is described. Thirdly, we describe a number of methods and tools, which support planning for sustainable development. Finally, some technical interface tools - especially a Web-based interface to the methods and tools...

  18. Formacion de Formadores en Planeamiento y Administracion de la Education: Informe Final. Reunion Tecnica de la Red REPLAD, Campinas, Sao Paulo, Brasil, 9-13 de noviembre de 1987. (Educational Development of Professionals in Educational Planning and Administration: Final Report. Proceedings of the Meeting of the Major Project for Education (Sao Paulo, Brazil, November 9-13, 1987).

    Science.gov (United States)

    United Nations Educational, Scientific, and Cultural Organization, Santiago (Chile). Regional Office for Education in Latin America and the Caribbean.

    This final report provides a synthesis of conference presentations by representatives from institutions in 17 Latin American and the Caribbean nations. The material includes descriptions about institutions of higher education planning and developing of their respective schools of education, ministries of education, and national and regional…

  19. From Server to Desktop: Capital and Institutional Planning for Client/Server Technology.

    Science.gov (United States)

    Mullig, Richard M.; Frey, Keith W.

    1994-01-01

    Beginning with a request for an enhanced system for decision/strategic planning support, the University of Chicago's biological sciences division has developed a range of administrative client/server tools, instituted a capital replacement plan for desktop technology, and created a planning and staffing approach enabling rapid introduction of new…

  20. Test planning and performance

    International Nuclear Information System (INIS)

    Zola, Maurizio

    2001-01-01

    Testing plan should include Safety guide Q4 - Inspection and testing - A testing plan should be prepared including following information: General information (facility name, item or system reference, procurement document reference, document reference number and status, associated procedures and drawings); A sequential listing of all testing activities; Procedure, work instruction, specification or standard to be followed in respect of each operation and test; Acceptance criteria; Identification of who is performing tests; Identification of hold points; Type of records to be prepared for each test; Persons and organizations having authority for final acceptance. Proposed activities sequence is: visual, electrical and mechanical checks; environmental tests (thermal aging, vibrations aging, radioactive aging); performance evaluation in extreme conditions; dynamic tests with functional checks; final electrical and mechanical checks The planning of the tests should always be performed taking into account an interpretative model: a very tight cooperation is advisable between experimental people and numerical people dealing with the analysis of more or less complex models for the seismic assessment of structures and components. Preparatory phase should include the choice of the following items should be agreed upon with the final user of the tests: Excitation points, Excitation types, Excitation amplitude with respect to frequency, Measuring points. Data acquisition, recording and storage, should take into account the characteristics of the successive data processing: to much data can be cumbersome to be processed, but to few data can make unusable the experimental results. The parameters for time history acquisition should be chosen taking into account data processing: for Shock Response Spectrum calculation some special requirements should be met: frequency bounded signal, high frequency sampling, shock noise. For stationary random-like excitation, the sample length

  1. Enhancing English Language Planning Strategy Using a WebQuest Model

    Science.gov (United States)

    Al-Sayed, Rania Kamal Muhammad; Abdel-Haq, Eman Muhammad; El-Deeb, Mervat Abou-Bakr; Ali, Mahsoub Abdel-Sadeq

    2016-01-01

    The present study aimed at developing English language planning strategy of second year distinguished governmental language preparatory school pupils using the a WebQuest model. Fifty participants from second year at Hassan Abu-Bakr Distinguished Governmental Language School at Al-Qanater Al-Khairia (Qalubia Governorate) were randomly assigned…

  2. Integrating strategic environmental assessment with industry planning: a case study of the Pasquai-Porcupine forest management plan, Saskatchewan, Canada.

    Science.gov (United States)

    Noble, Bram F

    2004-03-01

    Strategic environmental assessment (SEA) is gaining widespread recognition as a tool for integrating environmental considerations in policy, plan, and program development and decision-making. Notwithstanding the potential of SEA to improve higher-order decision processes, there has been very little attention given to integrating SEA with industry planning practices. As a result, the benefits of SEA have yet to be fully realized among industrial proponents. That said, SEA practice is ongoing, albeit informally and often under a different label, and is proving to be a valuable tool for industry planning and decision-making. Based on a case study of the Pasquai-Porcupine forest management plan in Saskatchewan, Canada, this paper illustrates how an integrated approach to SEA can contribute to industry environmental decision-making and can enhance the quality and deliverability of industry plans.

  3. Radiological accidents, scenarios, planning and answers

    International Nuclear Information System (INIS)

    Solis Delgado, Alexander.

    2008-01-01

    Radiological accidents, scenarios and the importance of a good planning to prevent and control these types of accidents are presented. The radiation can be only one of the risks in an accident, most of dominant radiological risks are not radiological (fire, toxic gases, etc.). The common causes of radiological accidents, potential risks such as external irradiation, internal contamination and the environment pollution are highlighted. In addition, why accidents happen and how they evolve is explained. It describes some incidents with the radiation occurred in Costa Rica from 1993 to 2007. The coordination of emergency management in Costa Rica in relation to a radiological accident, and some mechanisms of action that have practiced in other places are focuses. Among the final considerations are the need to finalize the national plan for radiological emergencies as a tool of empowerment for the teams of emergency care and the availability of information. Likewise the processes of communication, coordination and cooperation to avoid chaos, confusion and crisis are also highlighted [es

  4. Emergency evacuation/transportation plan update: Traffic model development and evaluation of early closure procedures. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-28

    Prolonged delays in traffic experienced by Laboratory personnel during a recent early dismissal in inclement weather, coupled with reconstruction efforts along NM 502 east of the White Rock Wye for the next 1 to 2 years, has prompted Los Alamos National Laboratory (LANL) to re-evaluate and improve the present transportation plan and its integration with contingency plans maintained in other organizations. Facilities planners and emergency operations staff need to evaluate the transportation system`s capability to inefficiently and safely evacuate LANL under different low-level emergency conditions. A variety of potential procedures governing the release of employees from the different technical areas (TAs) requires evaluation, perhaps with regard to multiple emergency-condition scenarios, with one or more optimal procedures ultimately presented for adoption by Lab Management. The work undertaken in this project will hopefully lay a foundation for an on-going, progressive transportation system analysis capability. It utilizes microscale simulation techniques to affirm, reassess and validate the Laboratory`s Early Dismissal/Closure/Delayed Opening Plan. The Laboratory is required by Federal guidelines, and compelled by prudent practice and conscientious regard for the welfare of employees and nearby residents, to maintain plans and operating procedures for evacuation if the need arises. The tools developed during this process can be used outside of contingency planning. It is anticipated that the traffic models developed will allow site planners to evaluate changes to the traffic network which could better serve the normal traffic levels. Changes in roadway configuration, control strategies (signalization and signing), response strategies to traffic accidents, and patterns of demand can be modelled using the analysis tools developed during this project. Such scenarios typically are important considerations in master planning and facilities programming.

  5. Analysis of Final Energy Demand by Sector in Malaysia using MAED Model

    International Nuclear Information System (INIS)

    Kumar, M.; Muhammed Zulfakar Mohd Zolkaffly; Alawiah Musa

    2011-01-01

    Energy supply security is important in ensuring a long term supply to fulfill the growing energy demand. This paper presents the use of IAEA energy planning tool, Model for Analysis of Energy Demand (MAED) to analyze, simulate and compare final energy demand by five different sectors in Malaysia under some assumptions, bounds and restrictions and the outcome can be used for planning of energy supply in future. (author)

  6. Final turbine and test facility design report Alden/NREC fish friendly turbine

    Energy Technology Data Exchange (ETDEWEB)

    Cook, Thomas C. [Alden Research Lab., Holden, MA (United States); Cain, Stuart A. [Alden Research Lab., Holden, MA (United States); Fetfatsidis, Paul [Alden Research Lab., Holden, MA (United States); Hecker, George E. [Alden Research Lab., Holden, MA (United States); Stacy, Philip S. [Alden Research Lab., Holden, MA (United States)

    2000-09-01

    The final report provides an overview of the Alden/NREC Fish Friendly turbine design phase, turbine test plan, preliminary test results, costs, schedule, and a hypothetical application at a real world project.

  7. 75 FR 41726 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Coverage of...

    Science.gov (United States)

    2010-07-19

    ... Health Plans and Health Insurance Issuers Relating to Coverage of Preventive Services Under the Patient... and health insurance coverage in the group and individual markets under provisions of the Patient... plans and group health insurance issuers for plan years beginning on or after September 23, 2010. These...

  8. Brain Computer Interfaces for Enhanced Interaction with Mobile Robot Agents

    Science.gov (United States)

    2016-07-27

    SECURITY CLASSIFICATION OF: Brain Computer Interfaces (BCIs) show great potential in allowing humans to interact with computational environments in a...Distribution Unlimited UU UU UU UU 27-07-2016 17-Sep-2013 16-Sep-2014 Final Report: Brain Computer Interfaces for Enhanced Interactions with Mobile Robot...published in peer-reviewed journals: Number of Papers published in non peer-reviewed journals: Final Report: Brain Computer Interfaces for Enhanced

  9. 77 FR 1078 - San Pablo Bay National Wildlife Refuge, Sonoma, Napa, and Solano Counties, CA; Final...

    Science.gov (United States)

    2012-01-09

    ... locations; develop shoreline fishing locations; and provide some additional environmental education programs... Comprehensive Conservation Plan and Finding of No Significant Impact AGENCY: Fish and Wildlife Service, Interior... availability of our final Comprehensive Conservation Plan (CCP) and finding of no significant impact (FONSI...

  10. Technical Work Plan for: Fracture and Lithophysal Studies

    International Nuclear Information System (INIS)

    2006-01-01

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models

  11. Technical Work Plan for: Fracture and Lithophysal Studies

    Energy Technology Data Exchange (ETDEWEB)

    n

    2006-09-11

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models.

  12. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  13. Single-shell tank interim stabilization project plan

    International Nuclear Information System (INIS)

    Ross, W.E.

    1998-01-01

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE's Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  14. U.S. LCI Database Project--Final Phase I Report

    Energy Technology Data Exchange (ETDEWEB)

    2003-08-01

    This Phase I final report reviews the process and provides a plan for the execution of subsequent phases of the database project, including recommended data development priorities and a preliminary cost estimate. The ultimate goal of the project is to develop publicly available LCI Data modules for commonly used materials, products, and processes.

  15. Metropolization Process for enhancing local and regional planning : an experience of cirebon metropolitan, West Java

    Science.gov (United States)

    Supriyadi Rustidja, E.

    2018-03-01

    Metropolitan develops in line with resource utilization, investment, and transactions of regional activities. Metropolization of an area gives emerge urban economy that changes the situation, form, and pattern of urban space interactions. On the other hand, metropolism concerns the strategy of changing variation of urban space, so that metropolitan invasion not only form of urban space but also the process of interaction among stakeholders in developing metropolitan area. Based on participatory research, this article explores metropolitan invasion process for enhancing local and regional planning, both indigenous and intrusive cataclysmic. The study find that the primeval, rural, and urban as elemental environment must be considered in developing metropolitan, not merely form the structure and pattern of urban space. The metropolization process also requires the strategic of rural urban linkage, context setting and local assessment, strategic community investment, and interculturalist approach. The other findings of the study show that metropolization in Cirebon Metropolitan, West Java emphasizing on promotion of competitiveness strategy, value chain urban activities, and networking of urban areas. Cirebon Metropolitan must promote the realization of growth centers and connect the interregional activities of metropolitan area for providing sustainable economic growth.

  16. Mathematic model of regional economy development by the final result of labor resources

    Science.gov (United States)

    Zaitseva, Irina; Malafeev, Oleg; Strekopytov, Sergei; Bondarenko, Galina; Lovyannikov, Denis

    2018-04-01

    This article presents the mathematic model of regional economy development based on the result of labor resources. The solution of a region development-planning problem is considered for the period of long-lasting planning taking into account the beginning and the end of the planned period. The challenge is to find the distribution of investments in the main and additional branches of the regional economy, which will provide simultaneous transaction of all major sectors of the regional economy from the given condition to the predetermined final state.

  17. 42 CFR 457.160 - Notice and timing of CMS action on State plan material.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Notice and timing of CMS action on State plan... § 457.160 Notice and timing of CMS action on State plan material. (a) Notice of final determination. The... amendment. (b) Timing. (1) A State plan or plan amendment will be considered approved unless CMS, within 90...

  18. Quality plan for criticality safety calculations at Rocky Flats

    International Nuclear Information System (INIS)

    Pecora, D.

    1978-01-01

    The text of the plan is given, and some of the guidelines followed in writing it are discussed to aid others who may be faced with the same task. The plan is divided into four sections. The Introduction describes the general functions and purpose of the calculational program. The second section, Activities and Responsibilities, lists specific tasks and their purposes and assigns responsibility for performance. The third section references relevant documentation (e.g., ANSI standards), and the final section describes quality plans for specific functions

  19. Characterization of the enhancing lesions on dynamic contrast enhanced magnetic resonance imaging in patients with interstitial mammoplasty

    International Nuclear Information System (INIS)

    Kim, Tae Yun; Kim, Sung Hun; Kang, Bong Joo; Kim, Hyeon Sook; Cha, Eun Suk; Kim, Ji Youn; Song, Byung Joo

    2013-01-01

    Purpose: The purpose of this study was to categorize the morphologic and kinetic features of enhancing lesions in breasts with interstitial mammoplasty using dynamic contrast-enhanced magnetic resonance imaging and to assess factors predictive of breast cancer. Materials and methods: We retrospectively reviewed the clinical and radiological data of 21 enhancing lesions in 19 patients with interstitial mammoplasty, who underwent breast magnetic resonance imaging and biopsy or an operation in our hospital from September 2008 to July 2012. These lesions were sorted by morphological and kinetic features and final assessment category according to the BI-RADS lexicon. Results: Nine cases were confirmed to be ductal carcinoma in situ (n = 2) and invasive ductal carcinoma (n = 7), and the remaining 12 cases were fibrocystic disease (n = 2), fibroadenoma (n = 2), fat necrosis (n = 1), foreign body granuloma (n = 3) and silicone mastitis (n = 1). Common features of malignancy included irregular shape (50.0%), spiculated margins (75.0%), heterogeneous enhancement (50.0%) and type III kinetic pattern (87.5%). The correlations of margins and kinetic curve pattern with benignity and malignancy approached statistical significance (p = 0.02, respectively). We found no correlation for shape (p = 0.33) or internal enhancement (p = 0.42) between lesion types. The malignancy rate of enhancing lesions was 42.8% (9/21). The sensitivity and specificity of dynamic contrast-enhanced magnetic resonance imaging were 100% and 16.67%, respectively. The positive predictive value, negative predictive value and accuracy of magnetic resonance imaging were 47.38%, 100% and 52.38%. Overall inter-observer agreement for the kinetic curve pattern was good (κ = 0.67). Moderate agreement was seen in describing the shape, margin, enhancement and assessing the final category (κ = 0.59, 0.46, 0.58 and 0.49, respectively). Conclusion: Dynamic contrast-enhanced magnetic resonance imaging had a high

  20. Characterization of the enhancing lesions on dynamic contrast enhanced magnetic resonance imaging in patients with interstitial mammoplasty

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Yun [Department of Radiology, Seoul St. Mary' s Hospital, The Catholic University of Korea (Korea, Republic of); Kim, Sung Hun, E-mail: rad-ksh@catholic.ac.kr [Department of Radiology, Seoul St. Mary' s Hospital, The Catholic University of Korea (Korea, Republic of); Kang, Bong Joo [Department of Radiology, Seoul St. Mary' s Hospital, The Catholic University of Korea (Korea, Republic of); Kim, Hyeon Sook [Department of Radiology, St. Paul Hospital, The Catholic University of Korea (Korea, Republic of); Cha, Eun Suk [Department of Radiology, Ewha Womans University, School of Medicine, Mokdong Hospital (Korea, Republic of); Kim, Ji Youn [Department of Radiology, Yeouido St. Mary' s Hospital, The Catholic University of Korea (Korea, Republic of); Song, Byung Joo [Department of Surgery, Seoul St. Mary' s Hospital, The Catholic University of Korea, Seoul (Korea, Republic of)

    2013-12-01

    Purpose: The purpose of this study was to categorize the morphologic and kinetic features of enhancing lesions in breasts with interstitial mammoplasty using dynamic contrast-enhanced magnetic resonance imaging and to assess factors predictive of breast cancer. Materials and methods: We retrospectively reviewed the clinical and radiological data of 21 enhancing lesions in 19 patients with interstitial mammoplasty, who underwent breast magnetic resonance imaging and biopsy or an operation in our hospital from September 2008 to July 2012. These lesions were sorted by morphological and kinetic features and final assessment category according to the BI-RADS lexicon. Results: Nine cases were confirmed to be ductal carcinoma in situ (n = 2) and invasive ductal carcinoma (n = 7), and the remaining 12 cases were fibrocystic disease (n = 2), fibroadenoma (n = 2), fat necrosis (n = 1), foreign body granuloma (n = 3) and silicone mastitis (n = 1). Common features of malignancy included irregular shape (50.0%), spiculated margins (75.0%), heterogeneous enhancement (50.0%) and type III kinetic pattern (87.5%). The correlations of margins and kinetic curve pattern with benignity and malignancy approached statistical significance (p = 0.02, respectively). We found no correlation for shape (p = 0.33) or internal enhancement (p = 0.42) between lesion types. The malignancy rate of enhancing lesions was 42.8% (9/21). The sensitivity and specificity of dynamic contrast-enhanced magnetic resonance imaging were 100% and 16.67%, respectively. The positive predictive value, negative predictive value and accuracy of magnetic resonance imaging were 47.38%, 100% and 52.38%. Overall inter-observer agreement for the kinetic curve pattern was good (κ = 0.67). Moderate agreement was seen in describing the shape, margin, enhancement and assessing the final category (κ = 0.59, 0.46, 0.58 and 0.49, respectively). Conclusion: Dynamic contrast-enhanced magnetic resonance imaging had a high

  1. Wilmar Planning Tool, VBA documentation

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Helge V.

    2006-01-15

    This is a documentation of the VBA (Visual Basic for Applications) in the Wilmar Planning Tool. VBA is used in the Wilmar User Shell (an Excel workbook) and in the three Access databases that hold input, scenario and output data. The Wilmar Planning Tool is developed in the project Wind Power Integration in Liberalised Electricity Markets (WILMAR) supported by EU (contract ENK5-CT-2002-00663). The User Shell controls the operation of the Wilmar Planning Tool. In the User Shell various control parameters are set, and then a macro in the Input Database is run that writes input files for the Joint market Model and the Long Term Model. Afterwards these models can be started from the User Shell. Finally, the User Shell can start a macro in the Output Database that imports the output files from the models. (LN)

  2. Wilmar Planning Tool, VBA documentation

    International Nuclear Information System (INIS)

    Larsen, Helge V.

    2006-01-01

    This is a documentation of the VBA (Visual Basic for Applications) in the Wilmar Planning Tool. VBA is used in the Wilmar User Shell (an Excel workbook) and in the three Access databases that hold input, scenario and output data. The Wilmar Planning Tool is developed in the project Wind Power Integration in Liberalised Electricity Markets (WILMAR) supported by EU (contract ENK5-CT-2002-00663). The User Shell controls the operation of the Wilmar Planning Tool. In the User Shell various control parameters are set, and then a macro in the Input Database is run that writes input files for the Joint market Model and the Long Term Model. Afterwards these models can be started from the User Shell. Finally, the User Shell can start a macro in the Output Database that imports the output files from the models. (LN)

  3. 76 FR 23755 - Release of Draft Risk and Exposure Assessments and Final Integrated Review Plan for the National...

    Science.gov (United States)

    2011-04-28

    ... titled, ``Ozone National Ambient Air Quality Standards: Scope and Methods Plan for Health Risk and... Standards: Scope and Methods Plan for Welfare Risk and Exposure Assessment'' (REA Plan for the secondary... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Parts 50 and 58 [EPA-HQ-OAR-2008-0699; FRL-9300-4] RIN 2060...

  4. Great Ellipse Route Planning Based on Space Vector

    Directory of Open Access Journals (Sweden)

    LIU Wenchao

    2015-07-01

    Full Text Available Aiming at the problem of navigation error caused by unified earth model in great circle route planning using sphere model and modern navigation equipment using ellipsoid mode, a method of great ellipse route planning based on space vector is studied. By using space vector algebra method, the vertex of great ellipse is solved directly, and description of great ellipse based on major-axis vector and minor-axis vector is presented. Then calculation formulas of great ellipse azimuth and distance are deduced using two basic vectors. Finally, algorithms of great ellipse route planning are studied, especially equal distance route planning algorithm based on Newton-Raphson(N-R method. Comparative examples show that the difference of route planning between great circle and great ellipse is significant, using algorithms of great ellipse route planning can eliminate the navigation error caused by the great circle route planning, and effectively improve the accuracy of navigation calculation.

  5. COLLABORATIVE MULTI-LEVEL PLAN MONITORING

    Directory of Open Access Journals (Sweden)

    Mohamad K. ALLOUCHE

    2011-01-01

    Full Text Available The recent worldwide connectivity and the net-centricity of military operations (coalition-based operations are witnessing an increasing need for the monitoring of plan execution for enhanced resource management and decision making. Monitoring of ongoing operations is the process of continuous observation recording and reporting. In this process the plan becomes a resource that needs to be managed effi ciently. The centralized approach to plan monitoring soon reaches its limits when plan execution is distributed across different organizations/countries. We propose a new framework that would allow different monitoring nodes distributed across the network. An effi cient propagation mechanism that allows information exchange between the different nodes would also be needed. The main purpose of this mechanism is to present the right information, to the right person, at the right time. To cope with a rapid increase of information fl ow through the network, an effi cient alarm management mechanism allows the presentation of the information with an appropriate level of details.

  6. Impacted material placement plans

    International Nuclear Information System (INIS)

    Hickey, M.J.

    1997-01-01

    Impacted material placement plans (IMPP) are documents identifying the essential elements in placing remediation wastes into disposal facilities. Remediation wastes or impacted material(s) are those components used in the construction of the disposal facility exclusive of the liners and caps. The components might include soils, concrete, rubble, debris, and other regulatory approved materials. The IMPP provides the details necessary for interested parties to understand the management and construction practices at the disposal facility. The IMPP should identify the regulatory requirements from applicable DOE Orders, the ROD(s) (where a part of a CERCLA remedy), closure plans, or any other relevant agreements or regulations. Also, how the impacted material will be tracked should be described. Finally, detailed descriptions of what will be placed and how it will be placed should be included. The placement of impacted material into approved on-site disposal facilities (OSDF) is an integral part of gaining regulatory approval. To obtain this approval, a detailed plan (Impacted Material Placement Plan [IMPP]) was developed for the Fernald OSDF. The IMPP provides detailed information for the DOE, site generators, the stakeholders, regulatory community, and the construction subcontractor placing various types of impacted material within the disposal facility

  7. Software Engineering Improvement Activities/Plan

    Science.gov (United States)

    2003-01-01

    bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14). Work accomplishments included development, evaluation, and enhancement of a software cost model, performing literature search and evaluation of software tools available for code analysis and requirements analysis, and participating in other relevant software engineering activities. Monthly reports were submitted. This support was provided to the Flight Software Group/ED 1 4 in accomplishing the software engineering improvement engineering activities of the Marshall Space Flight Center (MSFC) Software Engineering Improvement Plan.

  8. Research Planning and Evaluation Project

    International Nuclear Information System (INIS)

    Song, Seunghyun; Kim, Doyang; Ryu, Byunghoon; Lim, Chaeyoung; Song, Leeyoung; Lee, Youngchul; Han, Changsun; Kim, Hackchoon

    2011-12-01

    - To activate R and D through a systematic and impartial evaluation by using information on efficient distribution of research resource, setting project priorities, and measuring achievement against goals produced after research on planning and evaluation system for the government-funded project for KAERI was conducted. - Nuclear R and D project is the representative national R and D project which has been implemented in Korea. For the sustainable development of nuclear energy which supplies about 40% of total electricity generation and the enhancement of it innovative ability in the future, a systematic and efficient strategy in the planning stage is required

  9. The final management of nuclear fuel. Legal and economic aspects; La gestion final del combustible nuclear. Aspectos legales y economicos

    Energy Technology Data Exchange (ETDEWEB)

    Villota, C. de

    2009-07-01

    This article gives a brief summary of the characteristics of spent fuel and the lines of action considered for its management. It describes the legal framework that supports the Radioactive Waste Management Plan (PGRR), which contains the lines applicable to Final Spent Fuel Management, as well as the evolution of this legal framework. The article contains the 2008 updated costs of the various items of the PGRR, with a more detailed description of those related to this type of fuel, as well the source and amount of the financial contributions to the fund for meeting these costs, including how they have evolved over time. finally, it provides some personal reflections on this issue. (Author)

  10. Improving IMRT-plan quality with MLC leaf position refinement post plan optimization

    International Nuclear Information System (INIS)

    Niu Ying; Zhang Guowei; Berman, Barry L.; Parke, William C.; Yi Byongyong; Yu, Cedric X.

    2012-01-01

    Purpose: In intensity-modulated radiation therapy (IMRT) planning, reducing the pencil-beam size may lead to a significant improvement in dose conformity, but also increase the time needed for the dose calculation and plan optimization. The authors develop and evaluate a postoptimization refinement (POpR) method, which makes fine adjustments to the multileaf collimator (MLC) leaf positions after plan optimization, enhancing the spatial precision and improving the plan quality without a significant impact on the computational burden. Methods: The authors’ POpR method is implemented using a commercial treatment planning system based on direct aperture optimization. After an IMRT plan is optimized using pencil beams with regular pencil-beam step size, a greedy search is conducted by looping through all of the involved MLC leaves to see if moving the MLC leaf in or out by half of a pencil-beam step size will improve the objective function value. The half-sized pencil beams, which are used for updating dose distribution in the greedy search, are derived from the existing full-sized pencil beams without need for further pencil-beam dose calculations. A benchmark phantom case and a head-and-neck (HN) case are studied for testing the authors’ POpR method. Results: Using a benchmark phantom and a HN case, the authors have verified that their POpR method can be an efficient technique in the IMRT planning process. Effectiveness of POpR is confirmed by noting significant improvements in objective function values. Dosimetric benefits of POpR are comparable to those of using a finer pencil-beam size from the optimization start, but with far less computation and time. Conclusions: The POpR is a feasible and practical method to significantly improve IMRT-plan quality without compromising the planning efficiency.

  11. Closing the Communication Gap: "Web 2.0 Tools for Enhanced Planning and Collaboration"

    Science.gov (United States)

    Charles, Kelly J.; Dickens, Virginia

    2012-01-01

    Web 2.0 is expanding the way general and special educators collaborate, especially in co-teaching situations. This article draws attention to several free web-based tools and a co-teaching lesson plan supplement that can be used to incorporate Web 2.0 technologies during the co-planning, co-teaching and shared reflection processes between the…

  12. 2014 Enhanced LAW Glass Property-Composition Models, Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    Muller, Isabelle [The Catholic Univ. of America, Washington, DC (United States); Pegg, Ian L. [The Catholic Univ. of America, Washington, DC (United States); Joseph, Innocent [Energy Solutions, Salt Lake City, UT (United States); Gilbo, Konstantin [The Catholic Univ. of America, Washington, DC (United States)

    2015-10-28

    This report describes the results of testing specified by the Enhanced LAW Glass Property-Composition Models, VSL-13T3050-1, Rev. 0 Test Plan. The work was performed in compliance with the quality assurance requirements specified in the Test Plan. Results required by the Test Plan are reported. The te4st results and this report have been reviewed for correctness, technical adequacy, completeness, and accuracy.

  13. Risk evaluation system for facility safeguards and security planning

    International Nuclear Information System (INIS)

    Udell, C.J.; Carlson, R.L.

    1987-01-01

    The Risk Evaluation System (RES) is an integrated approach to determining safeguards and security effectiveness and risk. RES combines the planning and technical analysis into a format that promotes an orderly development of protection strategies, planing assumptions, facility targets, vulnerability and risk determination, enhancement planning, and implementation. In addition, the RES computer database program enhances the capability of the analyst to perform a risk evaluation of the facility. The computer database is menu driven using data input screens and contains an algorithm for determining the probability of adversary defeat and risk. Also, base case and adjusted risk data records can be maintained and accessed easily

  14. Improving treatment planning accuracy through multimodality imaging

    International Nuclear Information System (INIS)

    Sailer, Scott L.; Rosenman, Julian G.; Soltys, Mitchel; Cullip, Tim J.; Chen, Jun

    1996-01-01

    Purpose: In clinical practice, physicians are constantly comparing multiple images taken at various times during the patient's treatment course. One goal of such a comparison is to accurately define the gross tumor volume (GTV). The introduction of three-dimensional treatment planning has greatly enhanced the ability to define the GTV, but there are times when the GTV is not visible on the treatment-planning computed tomography (CT) scan. We have modified our treatment-planning software to allow for interactive display of multiple, registered images that enhance the physician's ability to accurately determine the GTV. Methods and Materials: Images are registered using interactive tools developed at the University of North Carolina at Chapel Hill (UNC). Automated methods are also available. Images registered with the treatment-planning CT scan are digitized from film. After a physician has approved the registration, the registered images are made available to the treatment-planning software. Structures and volumes of interest are contoured on all images. In the beam's eye view, wire loop representations of these structures can be visualized from all image types simultaneously. Each registered image can be seamlessly viewed during the treatment-planning process, and all contours from all image types can be seen on any registered image. A beam may, therefore, be designed based on any contour. Results: Nineteen patients have been planned and treated using multimodality imaging from November 1993 through August 1994. All registered images were digitized from film, and many were from outside institutions. Brain has been the most common site (12), but the techniques of registration and image display have also been used for the thorax (4), abdomen (2), and extremity (1). The registered image has been an magnetic resonance (MR) scan in 15 cases and a diagnostic CT scan in 5 cases. In one case, sequential MRs, one before treatment and another after 30 Gy, were used to plan

  15. Samish Indian Nation Long-Term Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Christine Woodward; B. Beckley; K. Hagen

    2005-06-30

    The Tribes strategic energy planning effort is divided into three phases: (1) Completing an Energy Resource Assessment; (2) Developing a Long-Term Strategic Energy Plan; and (3) Preparing a Strategic Energy Implementation Plan for the Samish Homelands. The Samish Indian Nation developed a comprehensive Strategic Energy plan to set policy for future development on tribal land that consists of a long-term, integrated, systems approach to providing a framework under which the Samish Community can use resources efficiently, create energy-efficient infrastructures, and protect and enhance quality of life. Development of the Strategic Energy plan will help the Samish Nation create a healthy community that will sustain current and future generations by addressing economic, environmental, and social issues while respecting the Samish Indian Nation culture and traditions.

  16. Timber management planning with timber ram and goal programming

    Science.gov (United States)

    Richard C. Field

    1978-01-01

    By using goal programming to enhance the linear programming of Timber RAM, multiple decision criteria were incorporated in the timber management planning of a National Forest in the southeastern United States. Combining linear and goal programming capitalizes on the advantages of the two techniques and produces operationally feasible solutions. This enhancement may...

  17. Development and validation of Monte Carlo dose computations for contrast-enhanced stereotactic synchrotron radiation therapy

    International Nuclear Information System (INIS)

    Vautrin, M.

    2011-01-01

    Contrast-enhanced stereotactic synchrotron radiation therapy (SSRT) is an innovative technique based on localized dose-enhancement effects obtained by reinforced photoelectric absorption in the tumor. Medium energy monochromatic X-rays (50 - 100 keV) are used for irradiating tumors previously loaded with a high-Z element. Clinical trials of SSRT are being prepared at the European Synchrotron Radiation Facility (ESRF), an iodinated contrast agent will be used. In order to compute the energy deposited in the patient (dose), a dedicated treatment planning system (TPS) has been developed for the clinical trials, based on the ISOgray TPS. This work focuses on the SSRT specific modifications of the TPS, especially to the PENELOPE-based Monte Carlo dose engine. The TPS uses a dedicated Monte Carlo simulation of medium energy polarized photons to compute the deposited energy in the patient. Simulations are performed considering the synchrotron source, the modeled beamline geometry and finally the patient. Specific materials were also implemented in the voxelized geometry of the patient, to consider iodine concentrations in the tumor. The computation process has been optimized and parallelized. Finally a specific computation of absolute doses and associated irradiation times (instead of monitor units) was implemented. The dedicated TPS was validated with depth dose curves, dose profiles and absolute dose measurements performed at the ESRF in a water tank and solid water phantoms with or without bone slabs. (author) [fr

  18. Biological planning in radiation therapy

    International Nuclear Information System (INIS)

    Ganchev, D.; Nakova, N.

    2017-01-01

    The aim of the study is to introduce and apply the generalized Equivalent Uniform Dose (gEUD) radiobiological model for dosimetry planning and assessment of dose distribution against the radiobiological response of the tumor and healthy tissues and its comparison with the standard traditional method of planning and evaluation by dose-rate histograms, determination of the advantages and disadvantages of the predictive radiobiological models against standard methodologies. Methods used: Planning was done with VMAT Technique Planning System Eclipse v13.6 - Photon Optimizer (PO) v13.6 optimization algorithm and Analytical Anisotropy Algorithm (AAA) v13.6 for calculating the final dose distribution. In each case, three dosimetry plans were developed: plan 1 - standard dosing with DV criteria to be used as control, plan 2 - planning with dose gEUD criteria only, and plan 3 - combined planning with 2 types (DV and gEUD) criteria. The results obtained were evaluated by a dose-response histogram against QUANTEC, the recommendations on the toxicity for normal tissue and the relationships between toxicity and volume effects. Results: The planning by using the gEUD method, though significantly more effective in protecting the normal tissue, has led to 'cold' and 'hot' spots with clinically unacceptable values and compared to the standard DV method. The combined method demonstrated superiority both for the formation of a dose distribution with a large inhomogeneity and irregular geometric shape, and reduction the dose in critical organs and normal tissue, with acceptable homogeneity and conformation of distribution. Conclusion: Dosimetry planning using the gEUD model has a number of advantages, the main of which is to provide criteria that correspond to radiobiological effects, but its specificity requires a great deal of attention when using it. Although it offers improved organ preservation, additional research is needed on the relationship between

  19. Planning and participation

    International Nuclear Information System (INIS)

    Rucht, D.

    1982-01-01

    This study is trying to give a vast survey of the political and administrative system. It is to demonstrate the relations between its secular development trends, the necessity and the limits of political planning under the present conditions and, finally, the increasing demands for participation as expressed especially by citizens' initiatives. These stages, however, are certainly not presented in a smooth manner. Yet the author claims to have kept a certain continuity and inner logic of presentation and argumentation. (orig./DG) [de

  20. The Planning and Scheduling of HST: Improvements and Enhancements since Launch

    Science.gov (United States)

    Taylor, D. K.; Chance, D. R.; Jordan, I. J. E.; Patterson, A. P.; Stanley, M.; Taylor, D. C.

    2001-12-01

    The planning and scheduling (P&S) systems used in operating the Hubble Space Telescope (HST) have undergone such substantial and pervasive re-engineering that today they dimly resemble those used when HST was launched. Processes (i.e., software, procedures, networking, etc.) which allow program implementation, the generation of a Long Range Plan (LRP), and the scheduling of science and mission activities have improved drastically in nearly 12 years, resulting in a consistently high observing efficiency, a stable LRP that principal investigators can use, exceptionally clean command loads uplinked to the spacecraft, and the capability of a very fast response time due to onboard anomalies or targets of opportunity. In this presentation we describe many of the systems which comprise the P&S ("front-end") system for HST, how and why they were improved, and what benefits have been realized by either the HST user community or the STScI staff. The systems include the Guide Star System, the Remote Proposal Submission System - 2 (RPS2), Artificial Intelligence (AI) planning tools such as Spike, and the science and mission scheduling software. We also describe how using modern software languages such as Python and better development practices allow STScI staff to do more with HST (e.g., to handle much more science data when ACS is installed) without increasing the cost to HST operations.