WorldWideScience

Sample records for energy transmission substation

  1. Canby Area Service Project substation and associated transmission line

    International Nuclear Information System (INIS)

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ''environmental impact statement'' is not required

  2. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  3. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  4. Electric power substations engineering

    CERN Document Server

    McDonald, John D

    2012-01-01

    The use of electric power substations in generation, transmission, and distribution remains one of the most challenging and exciting areas of electric power engineering. Recent technological developments have had a tremendous impact on all aspects of substation design and operation. With 80% of its chapters completely revised and two brand-new chapters on energy storage and Smart Grids, Electric Power Substations Engineering, Third Edition provides an extensive updated overview of substations, serving as a reference and guide for both industry and academia. Contributors have written each chapt

  5. MONITORING OF ELECTRICAL ENERGY QUALITY ON THE TRACTION SUBSTATION INPUT

    Directory of Open Access Journals (Sweden)

    O.G. Gryb

    2015-12-01

    Full Text Available For the implementation of measures to maintain the quality of the energy industrial enterprises have to spend a significant material and monetary assets. In this regard, significant is the feasibility study of the allocation of such funds and, primarily, the determination of the economic damage arising from low quality of electricity. The reliability of the electricity metering system, relay protection and automation of modern digital substations depends on the quality of electrical energy. At the present time to improve the reliability of the substation operation it is necessary to monitor indicators of quality of electric energy, allowing you to take organizational and technical solutions for their improvement. Monitoring the power quality at the input traction substation has shown that indicators such as the coefficient of the n-th harmonic component of the voltage does not meet the standards GOST 13109-97. The source of higher harmonics is a voltage Converter used on the locomotive. To eliminate higher harmonics in the supply network for traction substations will need to install power filters. Today, the USB-analyzer of power quality «Digital measurement system of power quality» type of CSICE of accuracy class 0.2. Work energy requires reliable and quality electricity supply to consumers. The new model of balancing energy market are bilateral contracts. The main task of this market, it ensure the stable and reliable operation of the unified energy system of Ukraine, that is, transmission and supply of electricity of appropriate quality.

  6. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  7. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    International Nuclear Information System (INIS)

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park

  8. Wolf Point Substation, Roosevelt County, Montana

    International Nuclear Information System (INIS)

    1991-05-01

    The Western Area Power Administration (Western), an agency of the United States Department of Energy, is proposing to construct the 115-kV Wolf Point Substation near Wolf Point in Roosevelt County, Montana (Figure 1). As part of the construction project, Western's existing Wolf Point Substation would be taken out of service. The existing 115-kV Wolf Point Substation is located approximately 3 miles west of Wolf Point, Montana (Figure 2). The substation was constructed in 1949. The existing Wolf Point Substation serves as a ''Switching Station'' for the 115-kV transmission in the region. The need for substation improvements is based on operational and reliability issues. For this environmental assessment (EA), the environmental review of the proposed project took into account the removal of the old Wolf Point Substation, rerouting of the five Western lines and four lines from the Cooperatives and Montana-Dakota Utilities Company, and the new road into the proposed substation. Reference to the new proposed Wolf Point Substation in the EA includes these facilities as well as the old substation site. The environmental review looked at the impacts to all resource areas in the Wolf Point area. 7 refs., 6 figs

  9. Regulatory Impacts on Distributed Generation and Upstream Transmission Substation Expansion Planning: A Novel Stochastic Bi-level Model

    Directory of Open Access Journals (Sweden)

    F. Misaghi

    2017-06-01

    Full Text Available In this paper, a novel framework is proposed to study impacts of regulatory incentive on distributed generation (DG investment in sub-transmission substations, as well as upgrading of upstream transmission substations. Both conventional and wind power technologies are considered here. Investment incentives are fuel cost, firm contracts, capacity payment and investment subsidy relating to wind power. The problem is modelled as a bi-level stochastic optimization problem, where the upper level consists of investor's decisions maximizing its own profit. Both market clearing and decision on upgrading of transmission substation aiming at minimizing the total cost are considered in the lower level. Due to non-convexity of the lower level and impossibility of converting to single level problem (i.e. mathematical programming with equilibrium constraints (MPEC, an algorithm combing enumeration and mathematical optimization is used to tackle with the non-convexity. For each upgrading strategy of substations, a stochastic MPEC, converted to a mixed integer linear programming (MILP is solved. The proposed model is examined on a six-bus and an actual network. Numerical studies confirm that the proposed model can be used for analysing investment behaviour of DGs and substation expansion.

  10. Ocean Wave Energy: Underwater Substation System for Wave Energy Converters

    International Nuclear Information System (INIS)

    Rahm, Magnus

    2010-01-01

    This thesis deals with a system for operation of directly driven offshore wave energy converters. The work that has been carried out includes laboratory testing of a permanent magnet linear generator, wave energy converter mechanical design and offshore testing, and finally design, implementation, and offshore testing of an underwater collector substation. Long-term testing of a single point absorber, which was installed in March 2006, has been performed in real ocean waves in linear and in non-linear damping mode. The two different damping modes were realized by, first, a resistive load, and second, a rectifier with voltage smoothing capacitors and a resistive load in the DC-link. The loads are placed on land about 2 km east of the Lysekil wave energy research site, where the offshore experiments have been conducted. In the spring of 2009, another two wave energy converter prototypes were installed. Records of array operation were taken with two and three devices in the array. With two units, non-linear damping was used, and with three units, linear damping was employed. The point absorbers in the array are connected to the underwater substation, which is based on a 3 m3 pressure vessel standing on the seabed. In the substation, rectification of the frequency and amplitude modulated voltages from the linear generators is made. The DC voltage is smoothened by capacitors and inverted to 50 Hz electrical frequency, transformed and finally transmitted to the on-shore measuring station. Results show that the absorption is heavily dependent on the damping. It has also been shown that by increasing the damping, the standard deviation of electrical power can be reduced. The standard deviation of electrical power is reduced by array operation compared to single unit operation. Ongoing and future work include the construction and installation of a second underwater substation, which will connect the first substation and seven new WECs

  11. Analysis of Norm IEC 61850 in the transmission of data via communications network of substations

    Energy Technology Data Exchange (ETDEWEB)

    Renda, T.; Botura Junior, G. [Universidade Estadual Paulista (UNESP), Sorocaba, SP (Brazil); Mesquita, L.; Rizol, P.M.S.R. [Universidade Estadual Paulista (UNESP), Guaratingueta, SP (Brazil)

    2009-07-01

    The tendency of using a protocol allows electrical substations to become 'intelligent', that is, capable of communicating in a much more efficient manner. This greatly reduces the number of connections, and as a consequence optimizes the speed between messages. The Norm IEC 61850-9-2 came to minimize the use of cables for the interconnections of various equipment involved in safety procedures of a substation. The present paper, has the objective of identifying a way of integrating the Norm IEC-61850 with the transmission of data via 'Generic Object Oriented Substation Event' (GOOSE) and of substituting the direct connection of binary I/O's of the Intelligent Electronic Devices also known as IED's. (author)

  12. Reliability 'H' scheme of HV/MV substations

    Directory of Open Access Journals (Sweden)

    Perić Dragoslav M.

    2015-01-01

    Full Text Available Substations (HV/MV connect transmission and distribution systems with consumers of electric energy. The selective search method was used for calculation of substation reliability, where all arrangement elements were grouped into blocks. Subject of the analysis was H-arrangements comprising air-insulated switchgears on the high voltage side of HV/MV substations with different number of feeder and transformer bays and diverse scope of the installed switching equipment. Failure rate and duration were used as main HV/MV substation equipment reliability indices. A large number of arrangements were classified into groups, and within a group the arrangements were ranked with the use of multiple criteria. It is shown that the reliability of the electricity transit depends on the equipment of field for the transit of electricity, which favors poorly equipped field. On the other hand, the reliability of transformation of the full power depends mostly on the equipment in coupling field. It is essential that in the coupling field, there are at least two disconnectors. Installation of the switch in the coupling field is meaningful only with appropriate protection, because it further improves reliability. Conclusions are drawn for phased construction and expansion of the single pole diagram with an additional field for the transmission line.

  13. 75 FR 43519 - Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No...

    Science.gov (United States)

    2010-07-26

    ... DEPARTMENT OF ENERGY Western Area Power Administration Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No. 5 Substation and the Palo Verde Hub AGENCY... Department of Energy (DOE), is requesting SOIs from entities that are interested in purchasing transmission...

  14. An application of data mining in district heating substations for improving energy performance

    Science.gov (United States)

    Xue, Puning; Zhou, Zhigang; Chen, Xin; Liu, Jing

    2017-11-01

    Automatic meter reading system is capable of collecting and storing a huge number of district heating (DH) data. However, the data obtained are rarely fully utilized. Data mining is a promising technology to discover potential interesting knowledge from vast data. This paper applies data mining methods to analyse the massive data for improving energy performance of DH substation. The technical approach contains three steps: data selection, cluster analysis and association rule mining (ARM). Two-heating-season data of a substation are used for case study. Cluster analysis identifies six distinct heating patterns based on the primary heat of the substation. ARM reveals that secondary pressure difference and secondary flow rate have a strong correlation. Using the discovered rules, a fault occurring in remote flow meter installed at secondary network is detected accurately. The application demonstrates that data mining techniques can effectively extrapolate potential useful knowledge to better understand substation operation strategies and improve substation energy performance.

  15. Marion Industrial Substation project

    International Nuclear Information System (INIS)

    1992-04-01

    Consumers Power, Inc. (CPI), proposes to construct a new distribution substation under the existing Bonneville Power Administration (BPA) Albay-Lebanon transmission line near the city of Albany in Linn County, Oregon. BPA is proposing to grant a new Point of Delivery to CPI at this substation. The purpose of the project is to serve the developing industrial needs in the Marion Industrial Park and on the 550 acres of nearby land within CPI's service area that are zoned for residential use. CPI prepared, and the Rural Electrification Administration (REA) has approved a Borrower's Environmental Report (BER) which addresses this action along with several other proposed projects in the CPI service area. Portions of this BER are summarized in this brief EA. BPA is preparing its own EA since Department of Energy National Environmental Policy Act (NEPA) guidelines require additional environmental concerns to be addressed than are required by REA's NEPA guidelines

  16. Fault Current Distribution and Pole Earth Potential Rise (EPR) Under Substation Fault

    Science.gov (United States)

    Nnassereddine, M.; Rizk, J.; Hellany, A.; Nagrial, M.

    2013-09-01

    New high-voltage (HV) substations are fed by transmission lines. The position of these lines necessitates earthing design to ensure safety compliance of the system. Conductive structures such as steel or concrete poles are widely used in HV transmission mains. The earth potential rise (EPR) generated by a fault at the substation could result in an unsafe condition. This article discusses EPR based on substation fault. The pole EPR assessment under substation fault is assessed with and without mutual impedance consideration. Split factor determination with and without the mutual impedance of the line is also discussed. Furthermore, a simplified formula to compute the pole grid current under substation fault is included. Also, it includes the introduction of the n factor which determines the number of poles that required earthing assessments under substation fault. A case study is shown.

  17. Calculation of noise maps around electrical energy substations

    International Nuclear Information System (INIS)

    Diniz, Fabiano B.; Zannin, Paulo H.T.

    2005-01-01

    This work is aimed at studying the noise caused by the transformers found in electrical substations located in calm areas in the city of Curitiba, Brazil. Although the level itself reaching the nearby buildings is not high if compared to other noise sources commonly found in a large city, they produce an annoying noise due to its low frequency tonal components. Two substations and their surroundings have been analyzed and acoustically mapped. The results have shown that some houses receive up to 35 dB(A) near one of the substations, which may led to some discomfort. It has also been noticed that a good planning of a substation, mainly of the firewalls, may help putting the houses under acoustical shadows. (Author)

  18. Ingledow 500 kV substation : using mixed technology switchgear solutions for replacement

    Energy Technology Data Exchange (ETDEWEB)

    Wallner, C.; Glaubitz, P. [Siemens AG, Munich (Germany); Messinger, T. [British Columbia Transmission Corp., Vancouver, BC (Canada)

    2008-07-01

    The reliability of the 500 kV equipment at the Ingledow substation operated by BC Hydro Transmission System is of critical importance due to the energy interchange with the Bonneville Power Authority in the United States and the major role of the substation in serving the energy needs of British Columbia's densely populated Lower Mainland. Presently, the 500 kV switchyard includes 10 airblast circuit breakers and the associated current transformers which are all approaching their end of service-life. In response to environmental and safety concerns, the British Columbia Transmission Corporation adopted a policy whereby new oil-filled transformers are no longer acceptable, and the replacement of existing oil-filled transformers must be oil-free. The result is that the current transformers must be either bushing-type or sulphur-hexafluoride (SF6) type. The replacement strategies for the substation equipment consider economical, environmental and seismic issues. They have just as strong an influence on the decision process as the technical, operational and reliability aspects for the particular case or switchgear replacement in the transmission system. The Ingledow case demonstrates the advantages of using mixed technology switchgear, with its compact design flowing from gas insulated switchgear (GIS) for replacement of equipment in an outdoor switchyard. The advantages of the MTS in this case offer the possibility of future reconfiguration to improve the system reliability within the existing switchyard space. 3 refs., 5 figs.

  19. Optimised compact SF6 switchgear, mobile substations and modules for improved substation economics

    Energy Technology Data Exchange (ETDEWEB)

    Mikes, E.G. [Areva T and D gas insulated substations, Oberetfelder (Switzerland); Montillet, G.F. [Areva T and D, Charleroi, PA (United States)

    2007-07-01

    One of the key elements of the electrical transmission and subdistribution networks in dense industrial areas and cities are gas insulated substations (GIS). More economical and ecological aspects in new designs are increasingly forcing the selection of smaller optimised switchgear. This paper discussed new spring mechanisms, gasket design, monitoring systems, and eco-design. Utilities are looking for new substations, upgrades, refurbishments and more efficient solutions for an extension to the current expanding infrastructure. For temporary installations, mines and some specific industries mobile substations are a great opportunity. The paper discussed several types of designs, including mobile GIS and one platform solutions for small and midsize substations; prefabricated and container solutions; hybrid switchgear modules with integrated control and monitoring functions; and optimization of GIS solutions for different station layouts having combined-functions such as circuit breaker/disconnector units. It was concluded that the search for the ongoing enhancement of the solutions in terms of cost-effectiveness and increased availability by utilities demonstrate that the system's rated voltage level and single-line-diagram configuration and in some cases the geographical position are the critical elements that determine the choice between several alternatives. 13 refs, 16 figs.

  20. Project FOOTPRINT: Substation modeling and simulations for E1 pulses

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Scott D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Larson, D. J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kirkendall, B. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-11-06

    This report includes a presentation with an: Introduction to CW coupling; Introduction to single-pulse coupling; Description of E1 waveforms; Structures in a substation yard --articulated (as part of the substation's defined electrical functionality)--unarticulated (not as part of the substation's defined electrical functionality); Coupling --electrical coupling (capacitive coupling) --magnetic coupling (inductive coupling); Connectivity to long-line transmission lines; Control infrastructure; Summary; and References.

  1. Investigation on Transmission and Substation Facilities of Sichuan Power Grid in Wenchuan Earthquake

    Institute of Scientific and Technical Information of China (English)

    Yu Yongqing; Li Guangfan; Li Peng; Zhu Quanjun; Yuan Dalu; Wang Chengyu; Li Jinzhong; Huang Huang; Li Lixin; Zhang Xinghai; Liu Jingmin

    2009-01-01

    @@ On May 12,2008,an earthquake of Ms 8.0 hit the area around Wenchuan County,Sichuan Province,China.It has been one of the most destructive earthquakes since the founding of P.R.China in 1949.The quake caused not only tremendous loss of life and wealth,but also severe damage to transmission and substation facilities.After the disaster,an expert group from China Electric Power Research Institute (CEPRI)was sent for on-site investigation.This paper is a summary of the investigation,in which suggestions for electric equipment to resist earthquake disasters are also proponed.

  2. Electric Substations

    Data.gov (United States)

    Department of Homeland Security — Substations. Substations are facilities and equipment that switch, transform, or regulate electric voltage. The Substations feature class includes taps, a location...

  3. Noise impact caused by electrical energy substations in the city of Curitiba, Brazil

    International Nuclear Information System (INIS)

    Diniz, F.B.; Zannin, P.H.T.

    2004-01-01

    This survey is intended to characterize the noise impact due to electrical energy substations in the city of Curitiba over the population living in their vicinity. This impact has been studied with the aid of a computational tool capable of mapping the acoustical field of substations and their vicinity. Several factors have been considered in this survey: (1) sound power of the transformers; (2) vehicle flow on the surrounding roads; (3) positioning of the firewalls, buildings and walls; and (4) terrain topography. Four substations have been analyzed, and an acoustical map has been traced for each of them. With these maps it was possible to visualize what was the incident noise level on the building facades. The predicted noise levels have been compared to the environmental legislation of the noise emissions in effect in the city

  4. Study on Noise Prediction Model and Control Schemes for Substation

    Science.gov (United States)

    Gao, Yang; Liu, Songtao

    2014-01-01

    With the government's emphasis on environmental issues of power transmission and transformation project, noise pollution has become a prominent problem now. The noise from the working transformer, reactor, and other electrical equipment in the substation will bring negative effect to the ambient environment. This paper focuses on using acoustic software for the simulation and calculation method to control substation noise. According to the characteristics of the substation noise and the techniques of noise reduction, a substation's acoustic field model was established with the SoundPLAN software to predict the scope of substation noise. On this basis, 4 reasonable noise control schemes were advanced to provide some helpful references for noise control during the new substation's design and construction process. And the feasibility and application effect of these control schemes can be verified by using the method of simulation modeling. The simulation results show that the substation always has the problem of excessive noise at boundary under the conventional measures. The excess noise can be efficiently reduced by taking the corresponding noise reduction methods. PMID:24672356

  5. Ashland Area Support Substation Project

    International Nuclear Information System (INIS)

    1992-06-01

    The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power ampersand Light Company's (PP ampersand L) 115-kilovolt (kV) transmission lines and through PP ampersand L's Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP ampersand L to allow transfer of three megawatts (MW's) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP ampersand L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them

  6. Ergonomic analyse of operation work in electric energy transmission substation; Analise ergonomica do trabalho de operacao de subestacoes de transmissao de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Menegon, Nilton Luiz

    1993-04-01

    The activity by the workers in sub-stations which transmits and distributes electric energy is studied within the context of ergonomic, i.e., of its adequateness to the human being characteristics. In the introduction of this book the ideas of ergonomic related to the behaviour of the workers who works which continuous processes in control room are reviewed. The development of the ideas in this field as well as the methodology to be followed in this work are discussed. The technical system involving the activities of the workers in sub-station is presented. These activities are inserted within a broad context of the electric energy sector. An analysis concerning the problems in the ergonomic field which justifies the ergonomic intervention follows the previous study. The work situation is characterized. The formal organization of the work and its physical and cognitive demands are examined. The task is explained in detail. With the analysis of the activities based on the systematic observation of the work performed by the workers, we finish this study. Finely, a diagnosis of the work situation and the recommendations compromised whit the workers health and improvement of the performance is settled. (author) 27 refs., 26 figs.

  7. Implementation and design of a communication system of an agent-based automated substation

    Institute of Scientific and Technical Information of China (English)

    LIN Yong-jun; LIU Yu-tao; ZHANG Dan-hui

    2006-01-01

    A substation system requires that communication be transmitted reliably,accurately and in real-time.Aimed at solving problems,e.g.,flow confliction and sensitive data transmission,a model of the communication system of an agent-based automated substation is introduced.The running principle is discussed in detail and each type of agent is discussed further.At the end,the realization of the agent system applied to the substation is presented.The outcome shows that the communication system of an agent-based automated substation improves the accuracy and reliability of the data transfer and presents it in realtime.

  8. Feasibility study of wireless power transmission systems

    Science.gov (United States)

    Robinson, W. J., Jr.

    1968-01-01

    Wireless microwave or laser energy transfers power from a manned earth-orbiting central station to unmanned astronomical substations. More efficient systems are required for the microwave power transmission.

  9. An improved method for predicting the lightning performance of high and extra-high-voltage substation shielding

    Science.gov (United States)

    Vinh, T.

    1980-08-01

    There is a need for better and more effective lightning protection for transmission and switching substations. In the past, a number of empirical methods were utilized to design systems to protect substations and transmission lines from direct lightning strokes. The need exists for convenient analytical lightning models adequate for engineering usage. In this study, analytical lightning models were developed along with a method for improved analysis of the physical properties of lightning through their use. This method of analysis is based upon the most recent statistical field data. The result is an improved method for predicting the occurrence of sheilding failure and for designing more effective protection for high and extra high voltage substations from direct strokes.

  10. Substation electromagnetic interference

    International Nuclear Information System (INIS)

    Felic, G.; Shihab, S.

    1997-01-01

    The electric and magnetic transients in high voltage substations were studied. The electric field measurements were carried out in a 66 kV switchyard of a 500/220/66 kV substation in Melbourne, Australia. The measured waveforms make up a database to be used for reference in the testing of substation control and protection equipment. The objective of this study was to characterize the radiated interference caused by the operation of disconnect switches and circuit breakers. Disconnect switch transients can be a serious hazard for substations because the slow moving contacts during opening and closing can result in arcing events of several seconds duration. Circuit breaker transients were considered to be less hazardous. Transient magnetic fields of at least several tens of A/m can occur during the energization of the capacitor bank. Substation electronic equipment should be tested and protected against the coupling of these transients in order to avoid breakdowns. 5 refs., 4 figs

  11. Decision 2010-021 : TransAlta Wind Ardenville wind plant and substation : application no. 1604970, proceeding ID 260

    International Nuclear Information System (INIS)

    2010-01-01

    TransAlta Wind, a wholly owned subsidiary of TransAlta Corporation, filed an application in April 2009 to construct and operate the Ardenville wind farm and substation in Alberta. The wind farm consists of 23 wind turbines, each rated at 3 MW, for a total installed capacity of 69 MW. The wind farm would be connected to the Alberta Interconnected Electric System at the substation. TransAlta anticipates that a new 138-kV transmission line will be required and has contacted the transmission facilities for the future applications. The Alberta Utilities Commission issued a notice to all interested parties and landholders within 2 km of the proposed wind farm. Two residents raised concerns regarding the use of fossil fuels and alternative fuels, ecological impacts and aesthetic impacts of wind farms and land values. Upon review of information, the Commission was satisfied that approval of the application was in the public interest and that the wind farm complies with all regulatory requirements, including sound levels. Pursuant to sections 11, 14 and 15 of the Hydro and Electric Energy Act, the Commission approved the application and granted approval to TransAlta Wind to construct and operate the Ardenville wind power plant and substation.

  12. Investigation on the Factors Affecting the Temperature in Urban Distribution Substations and an Energy-Saving Cooling Strategy

    Directory of Open Access Journals (Sweden)

    Fan Yang

    2011-02-01

    Full Text Available The different locations of the equipment in urban distribution substations (DSSs and the location of inlet holes and outlet holes usually result in different ventilation effect, which means the power consumed by any ventilating devices present is different. In this paper the temperature field distribution in an urban distribution substation with different locations of the equipment in the substation was calculated first, then factors influencing the temperature field distribution were investigated, and the influence of the different factors was analyzed. When the distance between the apparatus and walls exceeds 3 m, the change of the temperature in the DSS is very small. Therefore considering the floor area of the DSS, 3 m is the best value of the distance between the apparatus. With the change of the environment temperature or the velocity of the ventilation fans, the maximum temperature in the DSS or apparatus will change. Hence an energy saving ventilation strategy is proposed in the paper, and an intelligent cooling control system is developed, which can modify the velocity of the ventilation fans according to the environment temperature, and thus realize energy savings.

  13. Utilization of gamagraphy in shielded substation

    International Nuclear Information System (INIS)

    Franca, W.J.; Pereira, M.J.

    1987-01-01

    The radiographic inspection using gamma rays applied to the bars/ insulating cones conenctions in SF6 gas-insulated transmission lines to idetify the bars which its lenghts could cause a failure, without disassembling, is presented. Using gamma rays radiography it was possible to correct the lenght of the bars found out the permissible tolerances with substantial reduction of the servicing time and consequently increase of the substation reliability. (author) [pt

  14. Seismic response and rehabilitation of critical substation equipment

    Energy Technology Data Exchange (ETDEWEB)

    Saadeghvaziri, M.A.; Allaverdi, N.H. [New Jersey Inst. of Technology, Newark, NJ (United States); Ashrafi, A. [Columbia Univ., New York, NY (United States); Ersoy, S. [Greenman-Pedersen Inc., Babylon, NY (United States)

    2004-07-01

    Substations are one of the most important components of an electrical power system. They provide protection to transmission and distribution lines and transfer power between different voltage levels. Transformers and bushings within the substation are vulnerable to earthquake ground motion. It is extremely important that electric power systems remain functional following seismic damage. This study assessed the seismic response of critical substation equipment and described advanced technologies for rehabilitation measures such as the Friction Pendulum System (FPS). It presents the results of an extensive finite element analysis on response of transformers and bushings. The objective was to determine the seismic behaviour of transformers and bushings during an earthquake and to determine the probability of different failure modes. The response of an FPS isolated transformer to different earthquakes was also examined along with FPS radii, ground motion intensity and vertical excitations. A finite element model was developed for FPS. The study showed that seismic isolation is a viable mitigation strategy, but a modest increase in slack must be provided. 15 refs., 1 tab., 12 figs.

  15. Navajo transmission project Draft Environmental Impact Statement (DEIS)

    International Nuclear Information System (INIS)

    1996-09-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to either the Mead or the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Comers area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Comers/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Alternatives considered include energy conservation and electric load management, new generation facilities, use of existing transmission systems, alternative transmission technologies, no action, and the proposed action. For the proposed action, several alternative routes and ancillary facility locations are addressed: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources, and the impact of the transmission line's presence on visual resources and land uses

  16. optimization design of ground grid mesh of 132/33kv substation

    African Journals Online (AJOL)

    user

    INTRODUCTION. Grounding system for transmission substation is very ... drop will occur in mesh which will result in rise of mesh potentials ... minimize the effectiveness of transient voltage. ..... and Grounding in HC and LV Distribution System,.

  17. Fiber optic transmission system delivered to Fusion Research Center of Japan Atomic Energy Research Institute

    International Nuclear Information System (INIS)

    Hayashida, Mutsuo; Hiramoto, Kiyoshi; Yamazaki, Kunihiro

    1983-01-01

    In general there are many electromagnetically induced noises in the premises of factories, power plants and substations. Under such electrically bad environments, for the computer data transmission that needs high speed processing and high reliability, the optical fiber cable is superion to the coaxial cable or the flat-type cable in aspects of the inductionlessness and a wide bandwidth. Showa Electric Wire and Cable Co., Ltd. has delivered and installed a computer data transmission system consisting of optical modems and optical fiber cables for connecting every experiment building in the premises of Fusion Research Center of Japan Atomic Energy Research Institute. This paper describes the outline of this system. (author)

  18. SUBCALC 2.0 -- Substation magnetic field modeling program: User's manual

    International Nuclear Information System (INIS)

    Pappa, J.R.; Silva, J.M.; Kasten, D.; Sebo, S.; Ohio State Univ., Columbus, OH

    1995-11-01

    SUBCALC, a Microsoft reg-sign Windows trademark application, allows users to map magnetic fields in or around electric utility substations from common types of substation equipment. SUBCALC allows users to create a substation using predefined transmission and distribution lines and other substation components and to quickly modify them to match the desired operating conditions. Users have the option of invoking Power Line Calculator, a program that integrates with SUBCALC, to define power line conditions such as currents, phase angles, power factor, or symmetric components for three-phase lines that are unbalanced or carry net current. SUBCALC 2.0 offers numerous modeling, user interface, and editing enhancements. For example, users can now produce multi-segmented linear profile plots, take spot measurements anywhere in the model, extend lines with automatic connectivity to preexisting structures, and produce phantom extensions of lines beyond the model to avoid a ''stunted'' appearance to the field map. The program's output is available in four possible formats, including a three-dimensional map of the magnetic field, two-dimensional contours, two-dimensional profile plots, and a table with statistical values. All formats may be printed, accompanied by a three-dimensional view of the world the user has drawn

  19. THE CALCULATION OF THE ENERGY RECOVERY ELECTRIFIED URBAN TRANSPORT DURING THE INSTALLATION DRIVE FOR TRACTION SUBSTATION

    Directory of Open Access Journals (Sweden)

    A. A. Sulim

    2014-01-01

    Full Text Available At present a great attention is paid to increasing of energy efficiency at operated electrified urban transport. Perspective direction for increasing energy efficiency at that type of transport is the application of regenerative braking. For additional increasing of energy efficiency there were suggested the use of capacitive drive on tires of traction substation. One of the main task is the analysis of energy recovery application  with drive and without it.These analysis demonstrated that the calculation algorithms don’t allow in the full volume to carry out calculations of amount and cost of energy recovery without drive and with it. That is why we see the current interest to this topic. The purpose of work is to create methods of algorithms calculation for definite amount and cost of consumed, redundant and recovery energy of electrified urban transport due to definite regime of motion on wayside. There is algorithm developed, which allow to calculate amount and cost of consumed, redundant and recovery energy of electrified urban transport on wayside during the installation capacitive drive at traction substation. On the basis of developed algorithm for the definite regime of wagon motion of subway there were fulfilled the example of energy recovery amount and its cost calculation, among them with limited energy intensity drive, when there are 4 trains on wayside simultaneously.

  20. Fast substation service restoration using intelligent petri-nets models

    Energy Technology Data Exchange (ETDEWEB)

    Yang, H.T.; Peng, P.C.; Jiang, H.L. [Chung Yuan Christian Univ., Chung Li, Taiwan (China)

    2006-07-01

    Service restoration of a substation is a stressful and immediate task that must be conducted by system operators following a blackout. Operators, including those of Taiwan Power Company (TPC), normally restore power loads on the basis of their past experiences and engineering heuristics. Due to the significant number of switching operations to be evaluated, a computer-aided decision support system can be quite valuable. In distribution system automation, installation of unmanned substations requires an automated restoration computer system to rapidly devise a switching plan after a fault event. The modeling technique of Petri Nets (PNs) encompasses fault diagnosis of distribution systems, protective scheming of relays, and generic restoration schedule of power transmission systems. Knowledge or configuration about the system concerned can be expressed systematically through a structured model with parallelism and synchronization. This paper proposed a new PNs knowledge representation scheme to achieve a fast, on-line service restoration plan of a substation. The paper described the task of service restoration in a substation as well as the heuristic rules adopted by the dispatchers of the TPC distribution systems. The paper also introduced the topic of Typical PN properties and the proposed matrix operations for PNs reasoning. The proposed basic PNs model for service restoration on the basis of the engineering heuristics were also identified. It was concluded that the proposed approach not only facilitated software programming, but was highly adaptive to the extension or maintenance of the developed programs, arising from the changes of the substation configuration. 18 refs., 1 tab., 8 figs.

  1. Navajo transmission project. Final Environmental Impact Statement (FEIS)

    International Nuclear Information System (INIS)

    1997-08-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Corners area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Corners/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Six alternatives were considered and include (1) energy conservation and electric load management, (2) new generation facilities, (3) use of existing transmission systems, (4) alternative transmission technologies, (5) no action, and (6) the proposed action. For the proposed action, the following alternative routes and ancillary facility locations are addressed in the EIS: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described, and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources; and the impact of the transmission line's presence on visual resources and land uses. Public comments on the draft EIS are addressed in this FEIS

  2. Substation design improvement with a probabilistic reliability approach using the TOPASE program

    Energy Technology Data Exchange (ETDEWEB)

    Bulot, M.; Heroin, G.; Bergerot, J-L.; Le Du, M. [Electricite de France (France)

    1997-12-31

    TOPASE, (the French acronym for Probabilistic Tools and Data Processing for the Analysis of Electric Systems), developed by Electricite de France (EDF) to perform reliability studies on transmission substations, was described. TOPASE serves a dual objective of assisting in the automation of HV substation studies, as well as enabling electrical systems experts who are not necessarily specialists in reliability studies to perform such studies. The program is capable of quantifying the occurrence rate of undesirable events and of identifying critical equipment and the main incident scenarios. The program can be used to improve an existing substation, to choose an HV structure during the design stage, or to choose a system of protective devices. Data collected during 1996 and 1997 will be analyzed to identify useful experiences and to validate the basic concepts of the program. 4 figs.

  3. Electric power substations engineering

    CERN Document Server

    2003-01-01

    This book covers all aspects of substations, from the initial concept to design, automation, operation, and physical and cyber security. Written by members of the Institute of Electrical and Electronic Engineers (IEEE) Power Engineering Society (PES) Substations Committee, each section provides a tutorial and includes references for further reading and study. The authors use photographs and graphics to help the reader understand the material. Exploring the most recent technological developments regarding industry practice and standards, the book provides an extensive overview of substations th

  4. 20 CFR 631.50 - Substate plan.

    Science.gov (United States)

    2010-04-01

    ... THE JOB TRAINING PARTNERSHIP ACT Substate Programs § 631.50 Substate plan. (a) In order to receive an...)). (g) If a substate grantee fails to meet the requirements for plan submission and approval found in...

  5. Substation Reactive Power Regulation Strategy

    Science.gov (United States)

    Zhang, Junfeng; Zhang, Chunwang; Ma, Daqing

    2018-01-01

    With the increasing requirements on the power supply quality and reliability of distribution network, voltage and reactive power regulation of substations has become one of the indispensable ways to ensure voltage quality and reactive power balance and to improve the economy and reliability of distribution network. Therefore, it is a general concern of the current power workers and operators that what kind of flexible and effective control method should be used to adjust the on-load tap-changer (OLTC) transformer and shunt compensation capacitor in a substation to achieve reactive power balance in situ, improve voltage pass rate, increase power factor and reduce active power loss. In this paper, based on the traditional nine-zone diagram and combining with the characteristics of substation, a fuzzy variable-center nine-zone diagram control method is proposed and used to make a comprehensive regulation of substation voltage and reactive power. Through the calculation and simulation of the example, this method is proved to have satisfactorily reconciled the contradiction between reactive power and voltage in real-time control and achieved the basic goal of real-time control of the substation, providing a reference value to the practical application of the substation real-time control method.

  6. Decentralized substations for low-temperature district heating with no Legionella risk, and low return temperatures

    International Nuclear Information System (INIS)

    Yang, Xiaochen; Li, Hongwei; Svendsen, Svend

    2016-01-01

    To improve energy efficiency and give more access to renewable energy sources, low-temperature district heating (LTDH) is a promising concept to be realized in the future. However, concern about Legionella proliferation restricts applying low-temperature district heating in conventional systems with domestic hot water (DHW) circulation. In this study, a system with decentralized substations was analysed as a solution to this problem. Furthermore, a modification for the decentralized substation system were proposed in order to reduce the average return temperature. Models of conventional system with medium-temperature district heating, decentralized substation system with LTDH, and innovative decentralized substation system with LTDH were built based on the information of a case building. The annual distribution heat loss and the operating costs of the three scenarios were calculated and compared. From the results, realizing LTDH by the decentralized substation unit, 30% of the annual distribution heat loss inside the building can be saved compared to a conventional system with medium-temperature district heating. Replacing the bypass pipe with an in-line supply pipe and a heat pump, the innovative decentralized substation system can reduce distribution heat loss by 39% compared to the conventional system and by 12% compared to the normal decentralized substation system with bypass. - Highlights: • The system of decentralized substations can realize low-temperature district heating without running the risk of Legionella. • Decentralized substations help reduce the distribution heat loss inside the building compared to conventional system. • A new concept that can reduce the return temperature for district heating is proposed and analysed.

  7. Implementation of superconducting fault current limiter for flexible operation in the power substation

    Energy Technology Data Exchange (ETDEWEB)

    Song, Chong Suk, E-mail: chong_suk@korea.ac.kr [School of Electrical Engineering, Korea University, Anam dong, Seonbukgu, Seoul 136-713 (Korea, Republic of); Lee, Hansang [School of Railway and Electrical Engineering, Kyungil University, Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do 712-701 (Korea, Republic of); Cho, Yoon-sung [Department of Electric and Energy Engineering, Catholic University of Daegu, Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do 712-702 (Korea, Republic of); Suh, Jaewan [School of Electrical Engineering, Korea University, Anam dong, Seonbukgu, Seoul 136-713 (Korea, Republic of); Jang, Gilsoo, E-mail: gjang@korea.ac.kr [School of Electrical Engineering, Korea University, Anam dong, Seonbukgu, Seoul 136-713 (Korea, Republic of)

    2014-09-15

    Highlights: • The power load concentrated in load centers results in high levels of fault current. • This paper introduces a fault current reduction scheme using SFCLs in substations. • The SFCL is connected in parallel to the bus tie between the two busbars. • The fault current mitigation using SFCLs is verified through PSS/e simulations. - Abstract: The concentration of large-scale power loads located in the metropolitan areas have resulted in high fault current levels during a fault thereby requiring the substation to operate in the double busbar configuration mode. However, the double busbar configuration mode results in deterioration of power system reliability and unbalanced power flow in the adjacent transmission lines which may result in issues such as overloading of lines. This paper proposes the implementation of the superconducting fault current limiter (SFCL) to be installed between the two substation busbars for a more efficient and flexible operation of the substation enabling both single and double busbar configurations depending on the system conditions for guaranteeing power system reliability as well as fault current limitations. Case studies are being performed for the effectiveness of the SFCL installation and results are compared for the cases where the substation is operating in single and double busbar mode and with and without the installation of the SFCL for fault current mitigation.

  8. A Comparative Study on Substation Types and Network Layouts in Connection with Low-Energy District Heating Systems

    DEFF Research Database (Denmark)

    Tol, Hakan; Svendsen, Svend

    2012-01-01

    The study deals with low-energy district heating (DH) networks operating in low temperatures such as 55 °C in terms of supply and 25 °C in terms of return. The network layout, additional booster pumps, and different substation types such as storage tanks either equipped or not equipped in domesti...... for end-consumers were also studied, heat loss from these networks and the drop in temperature in the heat-carrier-supply medium being compared.......The study deals with low-energy district heating (DH) networks operating in low temperatures such as 55 °C in terms of supply and 25 °C in terms of return. The network layout, additional booster pumps, and different substation types such as storage tanks either equipped or not equipped in domestic...... hot water production site were examined. Effects of booster pumps on pipe dimensions in the latter case were investigated. Temperature drops during the summer months due to low heat demands of consumers were explored. Use of approaches such as looped networks and branched network layouts with bypasses...

  9. Characteristic Analysis of DC Electric Railway Systems with Superconducting Power Cables Connecting Power Substations

    Science.gov (United States)

    Ohsaki, H.; Matsushita, N.; Koseki, T.; Tomita, M.

    2014-05-01

    The application of superconducting power cables to DC electric railway systems has been studied. It could leads to an effective use of regenerative brake, improved energy efficiency, effective load sharing among the substations, etc. In this study, an electric circuit model of a DC feeding system is built and numerical simulation is carried out using MATLAB-Simulink software. A modified electric circuit model with an AC power grid connection taken into account is also created to simulate the influence of the grid connection. The analyses have proved that a certain amount of energy can be conserved by introducing superconducting cables, and that electric load distribution and concentration among the substations depend on the substation output voltage distribution.

  10. Characteristic analysis of DC electric railway systems with superconducting power cables connecting power substations

    International Nuclear Information System (INIS)

    Ohsaki, H; Matsushita, N; Koseki, T; Tomita, M

    2014-01-01

    The application of superconducting power cables to DC electric railway systems has been studied. It could leads to an effective use of regenerative brake, improved energy efficiency, effective load sharing among the substations, etc. In this study, an electric circuit model of a DC feeding system is built and numerical simulation is carried out using MATLAB-Simulink software. A modified electric circuit model with an AC power grid connection taken into account is also created to simulate the influence of the grid connection. The analyses have proved that a certain amount of energy can be conserved by introducing superconducting cables, and that electric load distribution and concentration among the substations depend on the substation output voltage distribution.

  11. Automated system for load flow prediction in power substations using artificial neural networks

    Directory of Open Access Journals (Sweden)

    Arlys Michel Lastre Aleaga

    2015-09-01

    Full Text Available The load flow is of great importance in assisting the process of decision making and planning of generation, distribution and transmission of electricity. Ignorance of the values in this indicator, as well as their inappropriate prediction, difficult decision making and efficiency of the electricity service, and can cause undesirable situations such as; the on demand, overheating of the components that make up a substation, and incorrect planning processes electricity generation and distribution. Given the need for prediction of flow of electric charge of the substations in Ecuador this research proposes the concept for the development of an automated prediction system employing the use of Artificial Neural Networks.

  12. Security architecture for substations. Voltage transformation stations and substations; Sicherheitsarchitektur fuer Substations. Umspannwerke und -stationen

    Energy Technology Data Exchange (ETDEWEB)

    Seewald, Maik G. [Cisco Systems GmbH, Halbergmoos (Germany). Bereich Forschung und Entwicklung

    2012-04-30

    Voltage transformation stations and substations are a central component of the electrical power supply. These fulfill key functions at different voltage levels, are highly automated and linked via different communication technologies. Thus they play a central role in the IT security and belong to the critical infrastructure. This is addressed by various standards and guidelines. Therefore, a comprehensive security structure for substations as well as primary and secondary systems are an important criterion for success in the expansion of power supply networks. This is even more important, since the degree of crosslinking will increase as a result of new systems and services. The author of the contribution under consideration depicts the security architecture which was specifically developed for this area by Cisco Systems GmbH (Hallbergmoos, Federal Republic of Germany).

  13. Development of Diagnostic Technology for Substation Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kweon, D.J.; Yoon, J.Y. [Korea Electric Power Research Institute, Taejeon (Korea, Republic of)

    1998-09-01

    This report contains the conceptual design of predictive diagnostic system for KEPCO 765kV substation apparatus which will be operated in 2001. Various kinds of techniques in the world for power transformer and GIS monitoring were examined, then the integrated diagnosis system configuration which will be most effective in our future substation was suggested. In addition, the development of the optimum life management for substation facilities. development of a system to measure the ESDD of substation insulator surfaces at a distance and application study of the degradation sensor(PCS) were described also. (author) 55 refs., 27 figs., 68 tabs.

  14. LIFE MANAGEMENT OF ASSET FROM HIGH VOLTAGE SUBSTATION

    Directory of Open Access Journals (Sweden)

    Sorina COSTINAŞ

    2010-11-01

    Full Text Available Companies have to reinvent continuously their business model. Maintenance can play a key role in the long-term profitability of a company. In Romania, especially since the liberalization of the energy market, the electrical companies are forced to identify and coordinate a lot of processes and to promote competitivity. It is necessary to work safety and be environmentally responsible in order to achieve electrical substations obiectives. In this paper will be presented maintenance strategy (replacement, upgrade or repair and informational aspects of decisional process (technical, financial, social politic, legal and risk aspects. Proposed methodology regarding the maintenance of electrical substation will be focused in how to improve the decisions for improving asset maintenance performance through ISO 9001/14001.

  15. Environmental impact of high voltage substations

    International Nuclear Information System (INIS)

    Geambasu, C.; Popadiuc, S.; Drobota, C.; Marza, F.

    2004-01-01

    The first Romanian methodology for simultaneous environmental and human risk evaluation in case of HV installations within substations pertaining to nuclear power stations, based on EU regulation is now applicable in Cernavoda substation. High voltage substations are zones where the environmental impact is focused on electromagnetic field that's causes particular effects in living tissues (human being included). That is the reason why is necessary to identify the potential risk sources, the asses including the way to correct them and to dissimulate the results to the staff and the operational personal.(author)

  16. Overview of electrical energy in November 2003

    International Nuclear Information System (INIS)

    2003-01-01

    The purpose of this document is to provide information concerning the operation of the French public transmission network and power system during the past month. The data published are interim figures dated 9 December 2003. National electrical consumption in France: national consumption is the total of all the electrical energy supplied for consumption in France (including Corsica, but not the French Overseas Departments), thermal and hydro generation + imports - exports - pumping, and which have been consumed in the transmission and distribution networks, by the end-users, as well as by losses. Gross consumption for the month of November 2003 rose by 2.5% compared with November 2002, mainly due to increased use of heating, as the average monthly temperature fell by 0.5 deg. C compared with November 2002. Adjusted for climate contingencies, monthly consumption rose by 0.9% compared with November 2002. In cumulative figures over 12 months, the rate of growth in adjusted consumption fell by 0.2% since last month, and the rate of growth in gross national consumption rose by 0.6 points. The energy balance recorded by the transmission network (the balance recorded by RTE takes into account only the energy physical flows conveyed on the RTE network). Consumption and physical exchanges, noteworthy data (these values reflect all the flows on the RTE network, as well as the generation auto-consumed by the industrial consumers connected to this network); the electricity market; the market players; contractual exchanges recorded by RTE (contracts for access to international connections, contractual exchanges by border (these exchanges include all transactions managed by RTE including historical contracts)). Transmission network development (the following facilities were commissioned on the RTE network in November): the 63 kV substation at Volvon, and the 63 kV Montrond-Volvon and Veauche-Volvon 2 lines, for strengthening 63 kV supply to the St Etienne region; the 63 k

  17. Using Immersive Virtual Reality for Electrical Substation Training

    Science.gov (United States)

    Tanaka, Eduardo H.; Paludo, Juliana A.; Cordeiro, Carlúcio S.; Domingues, Leonardo R.; Gadbem, Edgar V.; Euflausino, Adriana

    2015-01-01

    Usually, distribution electricians are called upon to solve technical problems found in electrical substations. In this project, we apply problem-based learning to a training program for electricians, with the help of a virtual reality environment that simulates a real substation. Using this virtual substation, users may safely practice maneuvers…

  18. Directional sound radiation from substation transformers

    International Nuclear Information System (INIS)

    Maybee, N.

    2009-01-01

    This paper presented the results of a study in which acoustical measurements at two substations were analyzed to investigate the directional behaviour of typical arrays having 2 or 3 transformers. Substation transformers produce a characteristic humming sound that is caused primarily by vibration of the core at twice the frequency of the power supply. The humming noise radiates predominantly from the tank enclosing the core. The main components of the sound are harmonics of 120 Hz. Sound pressure level data were obtained for various directions and distances from the arrays, ranging from 0.5 m to over 100 m. The measured sound pressure levels of the transformer tones displayed substantial positive and negative excursions from the calculated average values for many distances and directions. The results support the concept that the directional effects are associated with constructive and destructive interference of tonal sound waves emanating from different parts of the array. Significant variations in the directional sound pattern can occur in the near field of a single transformer or an array, and the extent of the near field is significantly larger than the scale of the array. Based on typical dimensions for substation sites, the distance to the far field may be much beyond the substation boundary and beyond typical setbacks to the closest dwellings. As such, the directional sound radiation produced by transformer arrays introduces additional uncertainty in the prediction of substation sound levels at dwellings within a few hundred meters of a substation site. 4 refs., 4 figs.

  19. Seminoe-Kortes transmission line/substation consolidation project, Carbon County, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    1990-07-01

    The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlines, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential for oil contamination of the river. This environmental assessment (EA) was prepared to evaluate the impacts of the proposed Seminoe-Kortes Consolidation Project. 57 refs., 12 figs., 8 tabs.

  20. Guidelines for District Heating Substations

    Energy Technology Data Exchange (ETDEWEB)

    2009-07-15

    The present guidelines contain a set of recommendations focusing on planning, installation, use and maintenance of district heating (DH) substations within district heating systems throughout Europe. The recommendations were developed in order to enable readers to develop well-functioning substations and an effective heat and domestic warm water delivery. These guidelines are intended to give the most effective overall solutions for various parts of the customer installation. The guidelines are not meant to specify the different components of the substation such as meters or heat exchangers. The guidelines deal with a wide variety of issues concerning both present systems of today and district heating systems of the future. Specific handling and maintenance recommendations are mainly focused on present modern systems but are also intended to cover the future situation as much as is feasible. For this reason, certain existing systems are not dealt with in these guidelines. For instance, these guidelines do not cover steam systems, systems with temperatures exceeding 110 deg C and pressure levels above 1.6 MPa. The guidelines include a chapter on the heat meter, as the meter and especially the meter installation is always installed simultaneously with the rest of the substation. These guidelines aim to provide best-practice and easy-to-handle recommendations for: - those who are responsible for relations between district heating utilities and customers; - those who own or maintain a building connected to the district heating network; - those who manufacture, plan, purchase, test and install substations. These guidelines do not deal with investment or cost aspects, but in general, Euroheat and Power recommends looking at the lifetime cost of all components of the substation, instead of investment costs alone. An example of this is provided in Chapter 7.8. The Guidelines were developed based on the most optimal operating principles of substations and meters

  1. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

  2. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    International Nuclear Information System (INIS)

    1995-05-01

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA)

  3. Independent Power Generation in a Modern Electrical Substation Based on Thermoelectric Technology

    Science.gov (United States)

    Li, Z. M.; Zhao, Y. Q.; Liu, W.; Wei, B.; Qiu, M.; Lai, X. K.

    2017-05-01

    Because of many types of electrical equipment with high power in substations, the potentiality of energy conservation is quite large. From this viewpoint, thermoelectric materials may be chosen to produce electrical energy using the waste heat produced in substations. Hence, a thermoelectric generation system which can recycle the waste heat from electric transformers was proposed to improve the energy efficiency and reduce the burden of the oil cooling system. An experimental prototype was fabricated to perform the experiment and to verify the feasibility. The experimental results showed that the output power could achieve 16 W from waste heat of 900 W, and that the power conversion efficiency was approximately 1.8%. Therefore, power generation is feasible by using the waste heat from the transformers based on thermoelectric technology.

  4. New model of inverting substation for DC traction with regenerative braking system

    Science.gov (United States)

    Omar, Abdul Malek Saidina; Samat, Ahmad Asri Abd; Isa, Siti Sarah Mat; Shamsuddin, Sarah Addyani; Jamaludin, Nur Fadhilah; Khyasudeen, Muhammad Farris

    2017-08-01

    This paper presents a power electronic devices application focus on modeling, analysis, and control of switching power converter in the inverting DC substation with regenerative braking system which is used to recycle the surplus regenerative power by feed it back to the main AC grid. The main objective of this research is to improve the switching power electronic converter of the railway inverting substation and optimize the maximum kinetic energy recovery together with minimum power losses from the railway braking system. Assess performance including efficiency and robustness will be evaluated in order to get the best solution for the design configuration. Research methodology included mathematical calculation, simulation, and detail analysis on modeling of switching power converter on inverting substation. The design stage separates to four main areas include rectification mode, regenerative mode, control inverter mode and filtering mode. The simulation result has shown that the regenerative inverter has a capability to accept a maximum recovery power on the regeneration mode. Total energy recovery has increase and power losses have decreases because inverter abilities to transfer the surplus energy back to the main AC supply. An Inverter controller with PWM Generator and PI Voltage Regulator has been designed to control voltage magnitude and frequency of the DC traction system.

  5. 2015 Plan. Project 7: the environmental issue and the electrical sector. Transmission systems

    International Nuclear Information System (INIS)

    1992-10-01

    The main impacts in socio-environmental analysis of transmission lines and substations for expansion of the Brazilian electrical sector are described, showing the actions of social compensation aiming a better insertion of the transmission lines and the substations. The issues relating with the natural and native reserves, the supply to the large consumer centers and the socio-environmental licensing of transmission enterprises are also discussed. (C.G.C.)

  6. National SCADA Test Bed Substation Automation Evaluation Report

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth Barnes; Briam Johnson

    2009-10-01

    Increased awareness of the potential for cyber attack has recently resulted in improved cyber security practices associated with the electrical power grid. However, the level of practical understanding and deployment of cyber security practices has not been evenly applied across all business sectors. Much of the focus has been centered on information technology business centers and control rooms. This report explores the current level of substation automation, communication, and cyber security protection deployed in electrical substations throughout existing utilities in the United States. This report documents the evaluation of substation automation implementation and associated vulnerabilities. This evaluation used research conducted by Newton-Evans Research Company for some of its observations and results. The Newton Evans Report aided in the determination of what is the state of substation automation in North American electric utilities. Idaho National Laboratory cyber security experts aided in the determination of what cyber vulnerabilities may pose a threat to electrical substations. This report includes cyber vulnerabilities as well as recommended mitigations. It also describes specific cyber issues found in typical substation automation configurations within the electric utility industry. The evaluation report was performed over a 5-month period starting in October 2008

  7. Electric Company - Medium Voltage Substations

    OpenAIRE

    MacCosham, Spencer

    2014-01-01

    The capstone project goal was to recommend ways to increase sales of our client’s product by a factor of 10. The core of our project included researching and analyzing the client’s “Model III” package-unit-substations. Specifically, the project objectives were two-fold: First, we were to conduct market research and data analysis on package unit substations in North America. We needed to identify sales channels, competitors, potential substitutes, etc. Second, we were to identify market/channe...

  8. Protection Coordination in Electrical Substation Part-2 Unit Protections (Differential and Distance Protection)

    OpenAIRE

    TÜR, Mehmet Rida; Shobole, Abdulfetah; Baysal, Mustafa; Wadi, Mohammed

    2018-01-01

    Power systemsmust be protected against faults to ensure quality and reliable generation,transmission and distribution of power systems. Power system protection is providedby the protection relays. This paper is the second part of the ProtectionCoordination study for the Siddik Kardesler Substation. The protection fortransmission lines, transformer, bus bars and customer feeders is provided byovercurrent protection, differential and distance protection schemes. In thispaper, issues related wit...

  9. Energy saving in the operation of industrial electrical substations. Part I. Studies

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez Jimenez, Juan J; Zerquera Izquierdo, Mariano D; Beltran Leon, Jose S; Garcia Martinez, Juan M; Alvarez Urena, Maria V; Meza Diaz, Guillermo [Universidad de Guadalajara (Mexico)]. E-mails: cheosj@yahoo.com; mdzi@hotmail.com; beltran5601@yahoo.com.mx; jmargarmtz@yahoo.com; victory_alvarez@telmexmail.com; depmec@cucei.udg.mx

    2013-03-15

    The main objective of this work is to offer a methodology for the operation of substations composed by two or more transformers that feed loads of first category. Understand by loads of first category those in that the interruption of the electric supply may cause the loss of human life. The core of this operation shows that in substations with several transformers, the number of transformers connected at a given moment should be one that avoids losses. [Spanish] El objetivo principal de este trabajo es ofrecer una metodologia para la operacion de subestaciones compuestas por dos o mas transformadores que alimentan cargas de primera categoria. Entendiendose por cargas de primera categoria, aquellas en que la interrupcion del suministro electrico puede causar la perdida de vidas humanas. El nucleo de esta operacion muestra que en las subestaciones con varios transformadores, el numero de transformadores conectados, en un momento dado, debe ser aquel que evite perdidas.

  10. Microwave energy transmission

    Energy Technology Data Exchange (ETDEWEB)

    Matsumoto, Hiroshi [Kyoto Univ. (Japan)

    1989-03-05

    Laying stress on the technological problems and effect on the environment of microwave energy transmission, recent scientific and engineering problems and related subjects are described. Because no fuel is required for the solar power generation, the power generation system can not be considered as an expensive one when the unit cost of energy is taken into consideration. Some of the important technological problems in the microwave energy transmission are accurate microwave beam control technology to receiving stations and improvement in the efficiency of transmission system. Microwave energy beam has effects on living bodies, communication, and plasma atmosphere of the earth. Microwave energy transmission using a space flyer unit is scheduled. Its objective is the development of microwave wireless transmission technology and the study of the correlation between high power microwave and ionosphere plasma. Experiments on such a small scale application as a microwave driven space ship to bring results seem also important. 12 refs., 13 figs.

  11. HVS effect in electric-power substations

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, F F

    1973-01-01

    A syndrome is described which the author calls the ''HVS effect'' (high-voltage substation) and affects persons working at substations where very high-voltage current is transformed and which disappears shortly after the end of the exposure. It is characterized by a feeling of tightness and oppression affecting the head, laxity and fatigue in the upper extremities and persistent insomnia; electroencephalograms show signs of cerebral pain. (Cis Abstr.)

  12. Automation of substation design

    Energy Technology Data Exchange (ETDEWEB)

    Milks, D. [Autodesk Inc., San Rafael, CA (United States); Scullion, T. [AutomationForce, Burlington, ON (Canada)

    2010-07-01

    Smart libraries and substation design tools are now being used by electric utilities to simplify and optimize the design of electrical control systems. A rules-based design and database approach was used to determine the placement of connections and for designing schematics, panel layouts wiring diagrams and cable schedules. Substation design solutions can reduce labour resources and field errors. Methods of synthesizing technologies in a database-centric architecture were discussed along with methods of selecting and adopting appropriate design technologies and methods for gaining efficiencies and managing change within organizations. The study demonstrated that the successful adoption of new technology requires a clear understanding of business objectives, technology requirements, and management support. 2 refs., 5 figs.

  13. HVS effect in electric-power substations

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, F.F.

    1973-01-01

    A syndrome is described which the author calls the ''HVS effect'' (high-voltage substation) and affects persons working at substations where very high-voltage current is transformed and which disappears shortly after the end of the exposure. It is characterized by a feeling of tightness and oppression affecting the head, laxity and fatigue in the upper extremities and persistent insomnia; electroencephalograms show signs of cerebral pain. (Cis Abstr.)

  14. Standard IEC 61850 substation automation

    Energy Technology Data Exchange (ETDEWEB)

    Bricchi, A.; Mezzadri, D. [Selta, Tortoreto (Italy)

    2008-07-01

    The International Electrotechnical Commission (IEC) 61850 standard is the reference communication protocol for all electrical substations protection and control systems. It creates models of all the elements and functionalities of an electrical substation, including physical elements such as switches or circuit breakers, as well as protection, control and monitoring functionalities. Network managers need to renew power substation automation and control systems in order to improve the efficiency and quality of services offered by electric utilities. Selta has proposed a new integrated solution for the automation of power substations which is fully compliant with the IEC 61850 norms. The solution involves the integration of control, automation, protection, monitoring and maintenance functions and applies leading edge technology to its systems, particularly for the TERNA network. The system is based on the use of many electronic devices at a power plant, each one with a specialized function, and all interconnected via a Station LAN. This solution, was tested on the TERNA network in Italy, in VHV and HV stations. It was shown to offer many advantages, such as an architecture based on full interoperability between control, monitoring and protection equipment; centralized and distributed automation; a LAN station that allows full interoperability between different bay units and protection relays in order to integrate equipment from various suppliers; the integration of automation systems in existing bay units and protection relays equipped with standard communication buses or with proprietary interfaces; and time synchronization for the entire system through a station GPS reception system. 10 refs., 1 tab., 7 figs.

  15. 77 FR 514 - Notice of Availability of the Record of Decision for the North Steens 230 Kilovolt Transmission...

    Science.gov (United States)

    2012-01-05

    ... subsidiary of Columbia Energy Partners, LLC, filed right-of-way (ROW) applications for ROWs with the BLM and... transmission system near Diamond Junction, Oregon. The ROD approves the BLM-preferred Alternative, now the... Project substation, south of Diamond, Oregon and connect to Harney Electric Cooperative's existing 115-kV...

  16. A soft computing scheme incorporating ANN and MOV energy in fault detection, classification and distance estimation of EHV transmission line with FSC.

    Science.gov (United States)

    Khadke, Piyush; Patne, Nita; Singh, Arvind; Shinde, Gulab

    2016-01-01

    In this article, a novel and accurate scheme for fault detection, classification and fault distance estimation for a fixed series compensated transmission line is proposed. The proposed scheme is based on artificial neural network (ANN) and metal oxide varistor (MOV) energy, employing Levenberg-Marquardt training algorithm. The novelty of this scheme is the use of MOV energy signals of fixed series capacitors (FSC) as input to train the ANN. Such approach has never been used in any earlier fault analysis algorithms in the last few decades. Proposed scheme uses only single end measurement energy signals of MOV in all the 3 phases over one cycle duration from the occurrence of a fault. Thereafter, these MOV energy signals are fed as input to ANN for fault distance estimation. Feasibility and reliability of the proposed scheme have been evaluated for all ten types of fault in test power system model at different fault inception angles over numerous fault locations. Real transmission system parameters of 3-phase 400 kV Wardha-Aurangabad transmission line (400 km) with 40 % FSC at Power Grid Wardha Substation, India is considered for this research. Extensive simulation experiments show that the proposed scheme provides quite accurate results which demonstrate complete protection scheme with high accuracy, simplicity and robustness.

  17. Transmission Line Series Compensation for Wind Energy Transmission

    International Nuclear Information System (INIS)

    Palanichamy, C; Wong, Y C

    2015-01-01

    Wind energy has demonstrated to be a clean, copious and absolutely renewable source of energy, and the large penetration of it into the power grid indicates that wind energy is considered an effective means of power generation, Transmission of wind energy from remote locations to load centers necessitates long transmission lines. Series compensation is a proven and economical transmission solution to address system power transfer strength, grid stability, and voltage profile issues of long transmission lines. In this paper, a programmable approach to determine the capacitive reactance of series capacitor and optimum location for its placement to achieve maximum power transfer gas been presented. The respective program with sample solutions has been provided for real-time applications. (paper)

  18. A new test procedure to evaluate the performance of substations for collective heating systems

    Science.gov (United States)

    Baetens, Robin; Verhaert, Ivan

    2017-11-01

    The overall heat demand of a single dwelling, existing out of space heating and domestic hot water production, decreases due to higher insulation rates. Because of this, investing in efficient and renewable heat generation becomes less interesting. Therefore, to incorporate renewables or residual heat on a larger scale, district heating or collective heating systems grow in importance. Within this set-up, the substation is responsible for the interaction between local demand for comfort and overall energy performance of the collective heating system. Many different configurations of substations exist, which influence both local comfort and central system performance. Next to that, also hybrids exist with additional local energy input. To evaluate performance of such substations, a new experimental-based test procedure is developed in order to evaluate these different aspects, characterized by the two roles a substation has, namely as heat generator and as heat consumer. The advantage of this approach is that an objective comparison between individual and central systems regarding performance on delivering local comfort can be executed experimentally. The lab set-up consists out of three different subsystems, namely the central system, the domestic hot water consumption and the local space heating. The central system can work with different temperature regimes and control strategies, as these aspects have proven to have the largest influence on actual performance. The domestic hot water system is able to generate similar tap profiles according to eco-design regulation for domestic hot water generation. The space heating system is able to demand a modular heat load.

  19. A new test procedure to evaluate the performance of substations for collective heating systems

    Directory of Open Access Journals (Sweden)

    Baetens Robin

    2017-01-01

    Full Text Available The overall heat demand of a single dwelling, existing out of space heating and domestic hot water production, decreases due to higher insulation rates. Because of this, investing in efficient and renewable heat generation becomes less interesting. Therefore, to incorporate renewables or residual heat on a larger scale, district heating or collective heating systems grow in importance. Within this set-up, the substation is responsible for the interaction between local demand for comfort and overall energy performance of the collective heating system. Many different configurations of substations exist, which influence both local comfort and central system performance. Next to that, also hybrids exist with additional local energy input. To evaluate performance of such substations, a new experimental-based test procedure is developed in order to evaluate these different aspects, characterized by the two roles a substation has, namely as heat generator and as heat consumer. The advantage of this approach is that an objective comparison between individual and central systems regarding performance on delivering local comfort can be executed experimentally. The lab set-up consists out of three different subsystems, namely the central system, the domestic hot water consumption and the local space heating. The central system can work with different temperature regimes and control strategies, as these aspects have proven to have the largest influence on actual performance. The domestic hot water system is able to generate similar tap profiles according to eco-design regulation for domestic hot water generation. The space heating system is able to demand a modular heat load.

  20. On-rail solution for autonomous inspections in electrical substations

    Science.gov (United States)

    Silva, Bruno P. A.; Ferreira, Rafael A. M.; Gomes, Selson C.; Calado, Flavio A. R.; Andrade, Roberto M.; Porto, Matheus P.

    2018-05-01

    This work presents an alternative solution for autonomous inspections in electrical substations. The autonomous system is a robot that moves on rails, collects infrared and visible images of selected targets, also processes the data and predicts the components lifetime. The robot moves on rails to overcome difficulties found in not paved substations commonly encountered in Brazil. We take advantage of using rails to convey the data by them, minimizing the electromagnetic interference, and at the same time transmitting electrical energy to feed the autonomous system. As part of the quality control process, we compared thermographic inspections made by the robot with inspections made by a trained thermographer using a scientific camera Flir® SC660. The results have shown that the robot achieved satisfactory results, identifying components and measuring temperature accurately. The embodied routine considers the weather changes along the day, providing a standard result of the components thermal response, also gives the uncertainty of temperature measurement, contributing to the quality in the decision making process.

  1. Major Refit for CERN's 400 kV Substation

    CERN Multimedia

    2001-01-01

    The 400 kV substation on the Prévessin site brings in the electricity that powers CERN's accelerators and the majority of the Laboratory's installations. It was originally built in the 1970s for the SPS, and is one of only five privately owned 400 kV sub-stations in France. Three of the others belong to the national railway company, SNCF, supplying the Paris-Marseilles TGV line, the other is at the Cadarache research centre near mouth of the Rhone. After nearly thirty years of service, CERN's substation has just undergone a complete overhaul. The new main 18 kV switchboard for the SPS pulsed network. The electricity supply for the original Prévessin substation was from the 400 kV EDF network, delivered through three 90 MW transformers at 18 kV to the SPS pulsed network, With the arrival of LEP, two 110 MW transformers were added to supply the new accelerator. Now, as CERN gears up for the LHC, additional pulsed power capacity is needed to supply the transfer lines carrying protons from...

  2. Enhancing the reliability of AC transmission networks by using a long distance HVDC-link

    Energy Technology Data Exchange (ETDEWEB)

    Fleckenstein, Marco; Balzer, Gerd; Wasserrab, Andreas; Neumann, Claus [Technische Univ. Darmstadt (Germany). Inst. of Electrical Power and Energy

    2012-07-01

    The absorption of energy from offshore wind farms is a difficult task for Transmission system operators (TSO) in Germany, even if no offshore wind farm is connected directly. The role of the TSOs in the north it is to transport this energy to the south of Germany. The transmission capacities of overhead lines are limited. With the expected rapid expansion of wind farms, this is no longer enough. Thus, the transmission system must be enhanced. One possibility is the installation of an HVDC link from north to south between two main substations in the 380 kV network. Based on a realistic case study, the impact of such a link on the reliability of the entire extra high voltage network is shown. (orig.)

  3. Analysis of the 35 KV substation secondary system

    Science.gov (United States)

    Zhao, Yong; Jiang, Jianguo; Jiang, Chunlei; Ren, Shuang; Liu, Songbin

    2017-04-01

    This paper analyzes the status of the two system of some 35KV users' substation in Daqing oil field, the deficiencies of the two system of the existing 35KV substation are found out. And put forward the opinion of acceptance in the future work. I hope it can able to work in the future on the protection of professional help.

  4. VT Electric Transmission Line Corridors - substation points

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The ELTRN layer depicts electric transmission line corridors in Vermont. Various methods have been used to digitize features. The data layer...

  5. Electrical substation service-area estimation using Cellular Automata: An initial report

    Energy Technology Data Exchange (ETDEWEB)

    Fenwick, J.W.; Dowell, L.J.

    1998-07-01

    The service areas for electric power substations can be estimated using a Cellular Automata (CA) model. The CA model is a discrete, iterative process whereby substations acquire service area by claiming neighboring cells. The service area expands from a substation until a neighboring substation service area is met or the substation`s total capacity or other constraints are reached. The CA-model output is dependent on the rule set that defines cell interactions. The rule set is based on a hierarchy of quantitative metrics that represent real-world factors such as land use and population density. Together, the metrics determine the rate of cell acquisition and the upper bound for service area size. Assessing the CA-model accuracy requires comparisons to actual service areas. These actual service areas can be extracted from distribution maps. Quantitative assessment of the CA-model accuracy can be accomplished by a number of methods. Some are as simple as finding the percentage of cells predicted correctly, while others assess a penalty based on the distance from an incorrectly predicted cell to its correct service area. This is an initial report of a work in progress.

  6. Substation Location in Offshore Wind Farms - A Planar Multi-Facility Location-Routing Problem

    OpenAIRE

    Amland, Thomas

    2014-01-01

    In offshore wind farms, two important parts of the design are to determine locations for substations and a cabling layout that connects every turbine to a substation. These problems are interconnected, as the cable layout depends on the choice of location for the substation. In this thesis we investigate how to set the location of substations such that the total cable cost is minimized.

  7. The study for defining the best technical and economical alternatives for the associated substation to the Tucurui hydraulic power plant - second stage; Estudo para definicao da melhor alternativa tecnico-economica para a subestacao elevadora-secionadora associada a Usina Hidroeletrica Tucurui - segunda etapa

    Energy Technology Data Exchange (ETDEWEB)

    Machado Junior, Camilo; Fukuoka, Nita; Rose, Eber Havila [ELETRONORTE, Brasilia, DF (Brazil)]. E-mail: eber@eln.gov.br; Martinez, Manuel Luis Barreira [Escola Federal de Engenharia de Itajuba, MG (Brazil). Inst. de Energia Eletrica. Dept. de Eletrotecnica; Violin, Airton

    2001-07-01

    This document presents a synthesis of the developed study for defining the switching scheme of the associated substation to the Tucurui hydraulic power plant second stage which is being constructed. In order to reduce the short circuit level in the first stage substation (in operation) to suitable values and, at the same time, to maintain the flexibility in the generator and transmission systems, it has been decided to install some series reactors between the substations in 550 Kv. The used methodology to define the suitable alternative is also discussed and the substation final configuration involving the first and second stages of the substation enlargement is presented through a illustration.

  8. New conceptual design for offshore wind power substations

    International Nuclear Information System (INIS)

    2016-01-01

    The presentation of the new offshore wind power substation project, Marin-el, took place last December at an event held at the Higher School of Naval Engineering (ETSIN), part of the Universidad Politécnica de Madrid (UPM). The project is headed up by Iberdrola and backed by the Government of the Basque Country with a project consortium featuring the participation of the Tecnalia technological centre and the Construcciones Navales del Norte (La Naval) shipyard among other firms from the naval and renewable energies sectors. (Author)

  9. BPA/Lower Valley transmission project. Final environmental impact statement

    International Nuclear Information System (INIS)

    1998-06-01

    Bonneville Power Administration and Lower Valley Power and Light, Inc. propose to solve a voltage stability problem in the Jackson and Afton, Wyoming areas. Lower Valley buys electricity from BPA and then supplies it to the residences and businesses of the Jackson and Afton, Wyoming areas. BPA is considering five alternatives. For the Agency Proposed Action, BPA and Lower Valley would construct a new 115-kV line from BPA's Swan Valley Substation near Swan Valley in Bonneville County, Idaho about 58 km (36 miles) east to BPA's Teton Substation near Jackson in Teton County, Wyoming. The new line would be next to an existing 115-kV line. The Single-Circuit Line Alternative has all the components of the Agency Proposed Action except that the entire line would be supported by single-circuit wood pole H-frame structures. the Short Line Alternative has all the components of the Single-Circuit Line Alternative except it would only be half as long. BPA would also construct a new switching station near the existing right-of-way, west or north of Targhee Tap. Targhee Tap would then be removed. For the Static Var Compensation Alternative, BPA would install a Static Var Compensator (SVC) at Teton or Jackson Substation. An SVC is a group of electrical equipment placed at a substation to help control voltage on a transmission system. The No Action Alternative assumes that no new transmission line is built, and no other equipment is added to the transmission system

  10. Overview of electrical energy in September 2003

    International Nuclear Information System (INIS)

    2003-01-01

    The purpose of this document is to provide information concerning the operation of the French public transmission network and power system during the past month. The data published are interim figures dated 10 October 2003. National electrical consumption in France: national consumption is the total of all the electrical energy supplied for consumption in France (including Corsica, but not the French Overseas Departments), thermal and hydro generation + imports - exports - pumping, and which have been consumed in the transmission and distribution networks, by the end-users, as well as by losses. National consumption for the month of September 2003 rose by 1.3% compared with September 2002; the average monthly temperature fell by 0.2 deg. C, resulting in a slight increase in consumption (+0.05 TWh). Adjusted for climatic contingencies, monthly consumption rose by 1.8% compared with September 2002. In cumulative figures over 12 months, the rate of growth in adjusted consumption rose by 0.1% since last month, and the rate of growth in gross national consumption remained stable. The energy balance recorded by the transmission network (RTE) takes into account only the energy physical flows conveyed on the RTE network. In September 2003, consumption in France rose compared with September 2002, mainly as a result of increased extractions from the distributions systems (+0.3 TWh). Compared with September 2002, monthly injections fell (-0.9 TWh) due to the combined effects of a substantial drop in hydroelectric generation (-1.2 TWh) and thermal generation (-0.2 TWh), whilst imports rose (+0.5 TWh). Exports were down by 1.3 TWh. France remained a net exporter to neighbouring countries throughout the month of September. Consumption and physical exchanges, noteworthy data (these values reflect all the flows on the RTE network, as well as the generation auto-consumed by the industrial consumers connected to this network); the electricity market; the market players; contractual

  11. Optimal Allocation of Smart Substations in a Distribution System Considering Interruption Costs of Customers

    DEFF Research Database (Denmark)

    Sun, Lei; You, Shi; Hu, Junjie

    2016-01-01

    number and allocation of smart substations in a given distribution system is presented, with the upgrade costs of substations and the interruption costs of customers taken into account. Besides, the reliability criterion is also properly considered in the model. By linearization strategies, the SSAM......One of the major functions of a smart substation (SS) is to restore power supply to interrupted customers as quickly as possible after an outage. The high cost of a smart substation limits its widespread utilization. In this paper, a smart substation allocation model (SSAM) to determine the optimal...

  12. Electrical energy in France in 2008

    International Nuclear Information System (INIS)

    2008-12-01

    The figures presented on this document account for the electricity flows recorded in Metropolitan France, including Corsica. Contents: national consumption; physical exchanges with foreign countries; electrical energy balance in France in 2008; net generation; noteworthy data for the year 2008 (daily maximum values of National consumption, Hydroelectric generation and non-Hydroelectric generation, Balance of physical exchanges); electricity market: cross-border contractual exchanges, balance responsible entities (Energy amount exchanged between balance responsible entities through the block exchange notifications), balancing mechanism (Global amount of energy activated upwards and downwards); power facilities: generating facilities in France (Nuclear, Fossil fuel thermal, Hydro-electric, Wind and Other renewable energy sources), transmission lines (circuit length in operation), transmission - transformers (installed capacity in operation); main transmission facilities commissioned during the year 2008 (substations connected to the RTE network and new or refurbished circuits)

  13. Advanced high-speed protection for transmission lines with different configurations

    Energy Technology Data Exchange (ETDEWEB)

    Tholomier, D.; Naisani, P. [Areva T and D Automation Canada Inc., Monteal, PQ (Canada); Apostolov, A. [Omicron Electronics, Houston, TX (United States)

    2008-07-01

    Power substations and transmission lines require intelligent (microprocessor-based) electronic devices (IED) for data acquisition, protection, metering, and control. This paper presented a universal transmission line protection relay with segregated phase differential protection as the main function and multiple backup protection functions, including 3 zone distance protection. It described features allowing the application of the IED to multi-terminal lines, mutual coupled lines, charging current compensation, transformer inrush current detection, breaker and a half and ring bus substation configurations. GPS synchronized current differential protection offers reliable protection for transmission and distribution circuits. The security of the protection relay can be improved significantly by combining it with fallback techniques to cover loss of GPS synchronizing, and by including non-differential elements as back-up during route switching and channel failures. 7 figs.

  14. Maintenance Optimization of High Voltage Substation Model

    Directory of Open Access Journals (Sweden)

    Radim Bris

    2008-01-01

    Full Text Available The real system from practice is selected for optimization purpose in this paper. We describe the real scheme of a high voltage (HV substation in different work states. Model scheme of the HV substation 22 kV is demonstrated within the paper. The scheme serves as input model scheme for the maintenance optimization. The input reliability and cost parameters of all components are given: the preventive and corrective maintenance costs, the actual maintenance period (being optimized, the failure rate and mean time to repair - MTTR.

  15. Flow and heat distribution analysis of different transformer sub-stations

    International Nuclear Information System (INIS)

    Hasini, H; Shuaib, N H; Yogendran, S B; Toh, K B

    2013-01-01

    This paper describes CFD investigation on the flow and heat transfer in transformers at different sub-station buildings. The analysis aimed to determine the cooling capability of the existing transformer building employing natural ventilation system to dissipate heat sufficiently when new dry-type transformer operating under full load condition is used. The transformer and building models were developed based on the actual transformer configuration in operation at three different locations in Malaysia. The calculation was carried out on three different types of sub-stations namely stand-alone, attach-to-building and underground. The effect of natural ventilation speed and building volume on the transformer surfaces temperature are also investigated. It was predicted that the existing sub-station configuration is able to dissipate heat produced from the dry type transformer by using its natural ventilation system regardless of the sub-station types. However, the smallest building case shows relatively high surrounding temperature

  16. ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

    Energy Technology Data Exchange (ETDEWEB)

    Sathaye, Jayant; Dale, Larry; Larsen, Peter; Fitts, Gary; Koy, Kevin; Lewis, Sarah; Lucena, Andre

    2011-06-22

    This report outlines the results of a study of the impact of climate change on the energy infrastructure of California and the San Francisco Bay region, including impacts on power plant generation; transmission line and substation capacity during heat spells; wildfires near transmission lines; sea level encroachment upon power plants, substations, and natural gas facilities; and peak electrical demand. Some end-of-century impacts were projected:Expected warming will decrease gas-fired generator efficiency. The maximum statewide coincident loss is projected at 10.3 gigawatts (with current power plant infrastructure and population), an increase of 6.2 percent over current temperature-induced losses. By the end of the century, electricity demand for almost all summer days is expected to exceed the current ninetieth percentile per-capita peak load. As much as 21 percent growth is expected in ninetieth percentile peak demand (per-capita, exclusive of population growth). When generator losses are included in the demand, the ninetieth percentile peaks may increase up to 25 percent. As the climate warms, California's peak supply capacity will need to grow faster than the population.Substation capacity is projected to decrease an average of 2.7 percent. A 5C (9F) air temperature increase (the average increase predicted for hot days in August) will diminish the capacity of a fully-loaded transmission line by an average of 7.5 percent.The potential exposure of transmission lines to wildfire is expected to increase with time. We have identified some lines whose probability of exposure to fire are expected to increase by as much as 40 percent. Up to 25 coastal power plants and 86 substations are at risk of flooding (or partial flooding) due to sea level rise.

  17. Exploring the conformational energy landscape of proteins

    Energy Technology Data Exchange (ETDEWEB)

    Nienhaus, G.U. [Univ. of Illinois, Urbana, IL (United States)]|[Universitaet Ulm (Germany); Mueller, J.D.; McMahon, B.H. [Univ. of Illinois, Urbana, IL (United States)] [and others

    1997-04-01

    Proteins possess a complex energy landscape with a large number of local minima called conformational substates that are arranged in a hierarchical fashion. Here we discuss experiments aimed at the elucidation of the energy landscape in carbonmonoxy myoglobin (MbCO). In the highest tier of the hierarchy, a few taxonomic substates exist. Because of their small number, these substates are accessible to detailed structural investigations. Spectroscopic experiments are discussed that elucidate the role of protonations of amino acid side chains in creating the substates. The lower tiers of the hierarchy contain a large number of statistical substates. Substate interconversions are observed in the entire temperature range from below 1 K up to the denaturation temperature, indicating a wide spectrum of energy barriers that separate the substates.

  18. Substation automation. Integration of applications of the SICLE; Automatizacion de subestaciones. Integracion de aplicaciones sobre el SICLE

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez, Gustavo; Vega, Miguel [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1997-12-31

    This paper presents the first applications developed by the Instituto de Investigaciones Electricas (IIE) on the infrastructure of the SICLE (Sistema de Informacion y Control Local de la Estacion) (Station Information and Local Control System), that Comision Federal de Electricidad (CFE) is now acquiring in order to automate its transmission substations. A computer infrastructure was obtained similar to the existing in the substation for the development of program testing at the IIE; the personnel of the same was trained; the applications in conjunction with the CFE specialists were defined; the agreed developments were made and installed at the Temascal II Substation. [Espanol] En el presente articulo se presentan las primeras aplicaciones desarrolladas por el Instituto de Investigaciones Electricas (IIE) sobre la infraestructura del SICLE (Sistema de Informacion y Control Local de Estacion) que esta adquiriendo la Comision Federal de Electricidad (CFE) a fin de automatizar sus subestaciones de transmision. Se obtuvo una infraestructura de computo similar a la existente en la subestacion para el desarrollo de prueba de programas en el IIE; se capacito al personal en la misma; se definieron las aplicaciones conjuntamente con los especialistas de la CFE; se hicieron los desarrollos acordados y se instalaron en la subestacion Temascal II.

  19. Substation automation. Integration of applications of the SICLE; Automatizacion de subestaciones. Integracion de aplicaciones sobre el SICLE

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez, Gustavo; Vega, Miguel [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    This paper presents the first applications developed by the Instituto de Investigaciones Electricas (IIE) on the infrastructure of the SICLE (Sistema de Informacion y Control Local de la Estacion) (Station Information and Local Control System), that Comision Federal de Electricidad (CFE) is now acquiring in order to automate its transmission substations. A computer infrastructure was obtained similar to the existing in the substation for the development of program testing at the IIE; the personnel of the same was trained; the applications in conjunction with the CFE specialists were defined; the agreed developments were made and installed at the Temascal II Substation. [Espanol] En el presente articulo se presentan las primeras aplicaciones desarrolladas por el Instituto de Investigaciones Electricas (IIE) sobre la infraestructura del SICLE (Sistema de Informacion y Control Local de Estacion) que esta adquiriendo la Comision Federal de Electricidad (CFE) a fin de automatizar sus subestaciones de transmision. Se obtuvo una infraestructura de computo similar a la existente en la subestacion para el desarrollo de prueba de programas en el IIE; se capacito al personal en la misma; se definieron las aplicaciones conjuntamente con los especialistas de la CFE; se hicieron los desarrollos acordados y se instalaron en la subestacion Temascal II.

  20. 30 CFR 77.811 - Movement of portable substations and transformers.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement of portable substations and transformers. 77.811 Section 77.811 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.811 Movement of portable substations...

  1. Transmission grid security

    CERN Document Server

    Haarla, Liisa; Hirvonen, Ritva; Labeau, Pierre-Etienne

    2011-01-01

    In response to the growing importance of power system security and reliability, ""Transmission Grid Security"" proposes a systematic and probabilistic approach for transmission grid security analysis. The analysis presented uses probabilistic safety assessment (PSA) and takes into account the power system dynamics after severe faults. In the method shown in this book the power system states (stable, not stable, system breakdown, etc.) are connected with the substation reliability model. In this way it is possible to: estimate the system-wide consequences of grid faults; identify a chain of eve

  2. Draft environmental impact statement - BPA/Lower Valley transmission project

    International Nuclear Information System (INIS)

    1997-06-01

    Bonneville Power Administration and Lower Valley Power and Light, Inc., propose to solve a voltage stability problem in the Jackson and Afton, Wyoming areas. For the Agency Proposed Action, BPA and Lower Valley would construct a new 115-kV line from BPA's Swan Valley Substation near Swan Valley in Bonneville County, Idaho about 58 km (36 miles) east to BPA's Teton Substation near Jackson in Teton County, Wyoming. The new line would be next to an existing 115-kV line. Most of the line would be supported by a mix of single-circuit wood pole H-frame structures would be used. The Single-Circuit Line Alternative has all the components of the Agency Proposed Action except that the entire line would be supported by single-circuit structures. The Short Line Alternative has all the components of the Single-Circuit Line Alternative except it would then be removed. For the Static Var Compensation Alternative, BPA would install a Static Var Compensator (SVC) at Teton or Jackson Substation. An SVC is a group of electrical equipment placed at a substation to help control voltage on a transmission system. The No Action Alternative assumes that no new transmission line is built, and no other equipment is added to the transmission system. The USFS (Targhee and Bridger-Teton National Forests) must select al alternative based on their needs and objectives, decide if the project complies with currently approved forest plans, decide if special use permits or easements are needed for construction, operation, and maintenance of project facilities, and decide if they would issue special use permits and letters of consent to grant easements for the project

  3. Electrical energy in France in 2009

    International Nuclear Information System (INIS)

    2009-12-01

    The figures presented on this document account for the electricity flows recorded in Metropolitan France, including Corsica. Contents: national consumption; physical exchanges with foreign countries; electrical energy balance in France in 2009; net generation; noteworthy data for the year 2009 (daily maximum values of national consumption, thermal generation, hydro-electric generation, wind generation and balance of physical exchanges); electricity market: cross-borders contractual exchanges, balance responsible entities (Energy amount exchanged between balance responsible entities through the block exchange notifications), balancing mechanism (global amount of energy activated upwards and downwards), daily market coupling; power facilities: generating facilities in France (Nuclear, Fossil fuel thermal, Hydro-electric, Wind and Other renewable energy sources), transmission lines owned by RTE (circuit length in operation), transmission - transformers owned by RTE (installed capacity in operation); main transmission facilities commissioned during the year 2009 (substations connected to the RTE network and new or refurbished circuits)

  4. Augmented Reality Applications for Substation Management by Utilizing Standards-Compliant SCADA Communication

    Directory of Open Access Journals (Sweden)

    Miro Antonijević

    2018-03-01

    Full Text Available Most electrical substations are remotely monitored and controlled by using Supervisory Control and Data Acquisition (SCADA applications. Current SCADA systems have been significantly enhanced by utilizing standardized communication protocols and the most prominent is the IEC 61850 international standard. These enhancements enable improvements in different domains of SCADA systems such as communication engineering, data management and visualization of automation process data in SCADA applications. Process data visualization is usually achieved through Human Machine Interface (HMI screens in substation control centres. However, this visualization method sometimes makes supervision, control and maintenance procedures executed by engineers slow and error-prone because it separates equipment from its automation data. Augmented reality (AR and mixed reality (MR visualization techniques have matured enough to provide new possibilities of displaying relevant data wherever needed. This paper presents a novel methodology for visualizing process related SCADA data to enhance and facilitate human-centric activities in substations such as regular equipment maintenance. The proposed solution utilizes AR visualization techniques together with standards-based communication protocols used in substations. The developed proof-of-concept AR application that enables displaying SCADA data on the corresponding substation equipment with the help of AR markers demonstrates originality and benefits of the proposed visualization method. Additionally, the application enables displaying widgets and 3D models of substation equipment to make the visualization more user-friendly and intuitive. The visualized SCADA data needs to be refreshed considering soft real-time data delivery restrictions. Therefore, the proposed solution is thoroughly tested to demonstrate the applicability of proposed methodology in real substations.

  5. Economic viability of distributed energy resources relative to substation and feeder facilities expansion

    DEFF Research Database (Denmark)

    Akorede, M. F.; Hizam, H.; Aris, I.

    2010-01-01

    Distributed energy resources have numerous benefits, of which is transmission network upgrade deferral. This application is particularly important where there are constraints in upgrading of the existing or construction of new generation units and transmission circuits. This paper presents a cost...

  6. Perspective loads of transformer substations at development of urban power supply systems

    Directory of Open Access Journals (Sweden)

    Svetlana Guseva

    2012-06-01

    Full Text Available In work the system approach to formation of the urban power supply system is given. The hierarchical structure of the construction, voltage levels and load densities is considered. The mathematical and geometrical modeling of service areas for transformer substations of diff erent voltage is fulfi lled. Determination of perspective loads of transformer substations is given. The method of graphic placement of transformer substations in the city territory for new substations at existing structure of networks is off ered. The calculation program Microsoft EXCEL and the graphic program AutoCad are used for realization of method. The method allows fi nding a rational decision for the development of urban power supply system on the beginning design stages in conditions of the information uncertainty.

  7. Experimental adoption of RCM in EDF substations

    International Nuclear Information System (INIS)

    Heroin, G.; Aupied, J.; Sanchis, G.

    1995-12-01

    EDF, after testing Reliability Centred Maintenance (RCM) on systems used in nuclear power plants, has now successfully extended RCM to all of its nuclear power plants. In the light of this experience, EDF has committed itself to a pilot study on a line bay of a 400 kV substation in 1992. The RCM method as applied benefited from EDF's policy of maintenance, introduced five years ago on all substations, which has enhanced prospects of reliability. The original feature in the selection of maintenance tasks was that it brought into play two criteria for failure assessment: frequency and seriousness, and two criteria for maintenance task selection: efficiency and facility. (author)

  8. Space and energy. [space systems for energy generation, distribution and control

    Science.gov (United States)

    Bekey, I.

    1976-01-01

    Potential contributions of space to energy-related activities are discussed. Advanced concepts presented include worldwide energy distribution to substation-sized users using low-altitude space reflectors; powering large numbers of large aircraft worldwide using laser beams reflected from space mirror complexes; providing night illumination via sunlight-reflecting space mirrors; fine-scale power programming and monitoring in transmission networks by monitoring millions of network points from space; prevention of undetected hijacking of nuclear reactor fuels by space tracking of signals from tagging transmitters on all such materials; and disposal of nuclear power plant radioactive wastes in space.

  9. Fuzzy logic based ELF magnetic field estimation in substations

    International Nuclear Information System (INIS)

    Kosalay, I.

    2008-01-01

    This paper examines estimation of the extremely low frequency magnetic fields (MF) in the power substation. First, the results of the previous relevant research studies and the MF measurements in a sample power substation are presented. Then, a fuzzy logic model based on the geometric definitions in order to estimate the MF distribution is explained. Visual software, which has a three-dimensional screening unit, based on the fuzzy logic technique, has been developed. (authors)

  10. Network Multifunctional Substation with Embedded System in Coal Mine

    Institute of Scientific and Technical Information of China (English)

    MENG Fan-rong; HUO Yan; ZHOU Yong

    2006-01-01

    In order to solve the problems of mining monitor and control systems during the construction process of digital mining combined with network and embedded technologies, the kernel access equipment of a mining monitor and control system was proposed and designed. It is the architecture of a mining embedded network multifunctional substation. This paper presents the design of hardware and software of the substation in detail. Finally, the system's efficiency was validated through experimentation.

  11. Substation interference on gas entrance of industrial plants

    Energy Technology Data Exchange (ETDEWEB)

    Freire, Paulo Edmundo; Giacommelo, Claudinei [PAIOL Engenharia, Paulinia, SP (Brazil)

    2009-12-19

    Industrial plants often have medium or high voltage electrical power entrance and also gas feeders. Often the main substation is located near the gas entrance, in the utilities area. When the occurrence of a phase to ground short-circuit in the substation, the pipeline and gas entrance that serves the plant may be exposed to high voltage soil potential, of the order of a few kilovolts, due to resistive coupling with the substation ground mesh. The consequences of this situation are reflected in various risks, with emphasis on: damage to the protective coating of the duct, due to the increased soil potential, in excess of its dielectric supportability (typically on the order of 5 kV); spread of potentially hazardous to duct exposed parts (valves, measuring place etc.); and damage to cathodic protection system components, as rectifier and insulating joins at gas entrance. This paper presents the investigations conducted in a factory that has a 69 kV main substation very close to the gas entrance, the order of a few meters away. The substation phase to ground short-circuit current is 7 kA, what causes a 9 kV soil potential near the gas pipe. It is presented the methodology for modeling the various elements involved in this process, the results of simulations made, arrangements been taken to reduce soil potential next to the duct to levels below 5 kV, and the measures for people and insulating joins protection. It is important to note that such problems usually will be solved with measures involving the entire grounding system of the industrial complex and also close to the duct (outside the industrial plant). The gas distribution companies should require from customers where this situation occurs, to ensure safety for people who have access to elements of its network, and for the integrity of their own ducts and cathodic protection components. The computer simulations developed for this work were made with the software Auto Grid, developed by the Canadian company Safe

  12. Application of Service Oriented Architecture for Sensors and Actuators in District Heating Substations

    Science.gov (United States)

    Gustafsson, Jonas; Kyusakov, Rumen; Mäkitaavola, Henrik; Delsing, Jerker

    2014-01-01

    Hardwired sensor installations using proprietary protocols found in today's district heating substations limit the potential usability of the sensors in and around the substations. If sensor resources can be shared and re-used in a variety of applications, the cost of sensors and installation can be reduced, and their functionality and operability can be increased. In this paper, we present a new concept of district heating substation control and monitoring, where a service oriented architecture (SOA) is deployed in a wireless sensor network (WSN), which is integrated with the substation. IP-networking is exclusively used from sensor to server; hence, no middleware is needed for Internet integration. Further, by enabling thousands of sensors with SOA capabilities, a System of Systems approach can be applied. The results of this paper show that it is possible to utilize SOA solutions with heavily resource-constrained embedded devices in contexts where the real-time constrains are limited, such as in a district heating substation. PMID:25196165

  13. MFTF 230 kV pulsed power substation

    International Nuclear Information System (INIS)

    Wilson, J.H.

    1979-01-01

    The Mirror Fusion Test Facility (MFTF) currently under construction at the Lawrence Livermore Laboratory includes a Sustaining Neutral Beam Power Supply System (SNBPSS) consisting of 24 power-supply sets. The System will operate in long pulses (initially .5 seconds and eventually 30 seconds) at high power (200 MW), which will necessitate a large source of ac power. To meet this requirement, a new 230-kV substation is also being built at LLL. The constraints of cost, equipment protection, short operating lifetime (10 years), and reliability dictated a unique substation design. Its unusual features include provisions for fast fault detection and tripping, a capability for limiting ground fault current, low impedance, and economical design

  14. Methodology for evaluating the grounding system in electrical substations; Metodologia para la evaluacion del sistema de puesta a tierra en subestaciones electricas

    Energy Technology Data Exchange (ETDEWEB)

    Torrelles Rivas, L.F [Universidad Nacional Experimental Politecnica: Antonio Jose de Sucre (UNEXPO), Guayana, Bolivar (Venezuela)]. E-mail: torrellesluis@gmail.com; Alvarez, P. [Petroleos de Venezuela S.A (PDVSA), Maturin, Monagas (Venezuela)]. E-mail: alvarezph@pdvsa.com

    2013-03-15

    The present work proposes a methodology for evaluating grounding systems in electrical substations from medium and high voltage, in order to diagnose the state of the elements of the grounding system and the corresponding electrical variables. The assessment methodology developed includes a visual inspection phase to the elements of the substation. Then, by performing measurements and data analysis, the electrical continuity between the components of the substation and the mesh ground is verified, the soil resistivity and resistance of the mesh. Also included in the methodology the calculation of the step and touch voltage of the substation, based on the criteria of the International IEEE standards. We study the case of the 115 kV Pirital Substation belonging to PDVSA Oriente Transmission Network. [Spanish] En el presente trabajo se plantea una metodologia para la evaluacion de sistemas de puesta a tierra en subestaciones electricas de media y alta tension, con la finalidad de diagnosticar el estado de los elementos que conforman dicho sistema y las variables electricas correspondientes. La metodologia de evaluacion desarrollada incluye una fase de inspeccion visual de los elementos que conforman la subestacion. Luego, mediante la ejecucion de mediciones y analisis de datos, se verifica la continuidad electrica entre los componentes de la subestacion y la malla de puesta a tierra, la resistividad del suelo y resistencia de la malla. Se incluye tambien en la metodologia el calculo de las tensiones de paso y de toque de la subestacion, segun lo fundamentado en los criterios de los estandares Internacionales IEEE. Se estudia el caso de la Subestacion Pirital 115 kV perteneciente a la Red de Transmision de PDVSA Oriente.

  15. Wireless energy transmission to supplement energy harvesters in sensor network applications

    Energy Technology Data Exchange (ETDEWEB)

    Farinholt, Kevin M [Los Alamos National Laboratory; Taylor, Stuart G [Los Alamos National Laboratory; Park, Gyuhae [Los Alamos National Laboratory; Farrar, Charles R [Los Alamos National Laboratory

    2010-01-01

    In this paper we present a method for coupling wireless energy transmission with traditional energy harvesting techniques in order to power sensor nodes for structural health monitoring applications. The goal of this study is to develop a system that can be permanently embedded within civil structures without the need for on-board power sources. Wireless energy transmission is included to supplement energy harvesting techniques that rely on ambient or environmental, energy sources. This approach combines several transducer types that harvest ambient energy with wireless transmission sources, providing a robust solution that does not rely on a single energy source. Experimental results from laboratory and field experiments are presented to address duty cycle limitations of conventional energy harvesting techniques, and the advantages gained by incorporating a wireless energy transmission subsystem. Methods of increasing the efficiency, energy storage medium, target applications and the integrated use of energy harvesting sources with wireless energy transmission will be discussed.

  16. Decentralized substations for low-temperature district heating with no Legionella risk, and low return temperatures

    DEFF Research Database (Denmark)

    Yang, Xiaochen; Li, Hongwei; Svendsen, Svend

    2016-01-01

    . From the results, realizing LTDH by the decentralized substation unit, 30% of the annual distribution heat loss inside the building can be saved compared to a conventional system with medium-temperature district heating. Replacing the bypass pipe with an in-line supply pipe and a heat pump...... with domestic hot water (DHW) circulation. In this study, a system with decentralized substations was analysed as a solution to this problem. Furthermore, a modification for the decentralized substation system were proposed in order to reduce the average return temperature. Models of conventional system...... with medium-temperature district heating, decentralized substation system with LTDH, and innovative decentralized substation system with LTDH were built based on the information of a case building. The annual distribution heat loss and the operating costs of the three scenarios were calculated and compared...

  17. PUREX new substation ATR

    International Nuclear Information System (INIS)

    Nelson, D.E.

    1997-01-01

    This document is the acceptance test report (ATR) for the New PUREX Main and Minisubstations. It covers the factory and vendor acceptance and commissioning test reports. Reports are presented for the Main 5 kV substation building, the building fire system, switchgear, and vacuum breaker; the minisubstation control building and switch gear; commissioning test; electrical system and loads inspection; electrical utilities transformer and cable; and relay setting changes based on operational experience

  18. Draft Environmental Impact Statement: BPA/Puget Power Northwest Washington Transmission Project

    International Nuclear Information System (INIS)

    1993-11-01

    Bonneville Power Administration (BPS) and Puget Sound Power ampersand Light (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit County area between the towns of Custer and Sedro Woolley, including within the city of Bellingham starting in 1995. The upgrades of the interconnected 230,000 volt (230-kV) and 115-kV systems are needed to increase the reliability of the local transmission system and to increase the import capacity on a nearby US-Canada 500-kV intertie by about 850 megawatts (MW). The increase in north-south transfer capability would be shared by BPA and Puget Power (about 425 MW each). Other actions would include replacement of an existing BPA 230-kV single-circuit, wood-pole H-frame transmission line with a lattice-steel double-circuit line; an existing Puget Power 115-kV single wood-pole transmission line rebuild, two short 115-kV Puget Power lines added at BPA's Bellingham Substation; and improvements made at existing BPA and Puget Power substations

  19. Simulation study on the lightning overvoltage invasion control transformer intelligent substation

    Science.gov (United States)

    Xi, Chuyan; Hao, Jie; Zhang, Ying

    2018-04-01

    By simulating lightning on substation line of one intelligent substation, research the influence of different lightning points on lightning invasion wave overvoltage, and the necessity of arrester for the main transformer. The results show, in a certain lightning protection measures, the installation of arrester nearby the main transformer can effectively reduce the overvoltage value of bus and the main transformer [1].

  20. 78 FR 60273 - Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild, Grand County...

    Science.gov (United States)

    2013-10-01

    ... marketing administration in the U.S. Department of Energy (DOE), owns and operates the 69-kilovolt (kV...-State) to improve reliability for their local customer, Mountain Parks Electric, Inc., and to minimize... still need to expand their transmission system to improve service reliability to their customers by...

  1. Modeling reliability of power systems substations by using stochastic automata networks

    International Nuclear Information System (INIS)

    Šnipas, Mindaugas; Radziukynas, Virginijus; Valakevičius, Eimutis

    2017-01-01

    In this paper, stochastic automata networks (SANs) formalism to model reliability of power systems substations is applied. The proposed strategy allows reducing the size of state space of Markov chain model and simplifying system specification. Two case studies of standard configurations of substations are considered in detail. SAN models with different assumptions were created. SAN approach is compared with exact reliability calculation by using a minimal path set method. Modeling results showed that total independence of automata can be assumed for relatively small power systems substations with reliable equipment. In this case, the implementation of Markov chain model by a using SAN method is a relatively easy task. - Highlights: • We present the methodology to apply stochastic automata network formalism to create Markov chain models of power systems. • The stochastic automata network approach is combined with minimal path sets and structural functions. • Two models of substation configurations with different model assumptions are presented to illustrate the proposed methodology. • Modeling results of system with independent automata and functional transition rates are similar. • The conditions when total independence of automata can be assumed are addressed.

  2. Earthquake evaluation of a substation network

    International Nuclear Information System (INIS)

    Matsuda, E.N.; Savage, W.U.; Williams, K.K.; Laguens, G.C.

    1991-01-01

    The impact of the occurrence of a large, damaging earthquake on a regional electric power system is a function of the geographical distribution of strong shaking, the vulnerability of various types of electric equipment located within the affected region, and operational resources available to maintain or restore electric system functionality. Experience from numerous worldwide earthquake occurrences has shown that seismic damage to high-voltage substation equipment is typically the reason for post-earthquake loss of electric service. In this paper, the authors develop and apply a methodology to analyze earthquake impacts on Pacific Gas and Electric Company's (PG and E's) high-voltage electric substation network in central and northern California. The authors' objectives are to identify and prioritize ways to reduce the potential impact of future earthquakes on our electric system, refine PG and E's earthquake preparedness and response plans to be more realistic, and optimize seismic criteria for future equipment purchases for the electric system

  3. Numerical modelling and experimental measurements for a low-temperature district heating substation for instantaneous preparation of DHW with respect to service pipes

    International Nuclear Information System (INIS)

    Brand, Marek; Thorsen, Jan Eric; Svendsen, Svend

    2012-01-01

    Traditional district heating (DH) systems are becoming uneconomic as the number of new and renovated buildings with reduced heating requirements increases. To keep DH competitive in the future, heat losses in DH networks need to be reduced. One option is to reduce the supply temperature of DH as much as possible. This requires a review and improvement of a DH network, in-house substations, and the whole domestic hot water (DHW) supply system, with the focus on user comfort, hygiene, overall cost and energy efficiency. This paper describes some practical approaches to the implementation of low-temperature district heating (LTDH) with an entry-to-substation temperature around 50 °C. To this end we developed a numerical model for an instantaneous LTDH substation that takes into consideration the effect of service pipes. The model has been verified and can be used for the further optimization of the whole concept as well for individual components. The results show that the way that the service pipe is operated has a significant effect on waiting time for DHW, heat loss, and overall cost. Furthermore, the service pipe should be kept warm by using a bypass in order to fulfil the comfort requirements for DHW instantaneously prepared. -- Highlights: ► Describes and justifies concept of low-temperature district heating with supply temperature of 50 °C. ► Focuses on DHW preparation in low-temperature district heating in-house substations, considering comfort and Legionella. ► Verified numerical model reports on dynamic performance of an in-house substation, considering operation of service pipes. ► Bypass is needed for instantaneous type of district heating substations to fulfil comfort requirements of users. ► The model developed can be used for future optimization of low-temperature substations and whole district heating networks.

  4. EMC considerations for protection of cables against switching effects at secondary side of substations

    Energy Technology Data Exchange (ETDEWEB)

    Heydari, H.; Faghihi, F.; Abbasi, V. [Iran Univ. of Science and Technology, Narmak, Tehran (Iran, Islamic Republic of). Center of Excellence for Power System Automation and Operation

    2007-07-01

    High performance and correct functionality of equipment that operate in high voltage substations during transient states need careful engineering design. To achieve electromagnetic compatibility (EMC) in a system, it is necessary to correct design problems and to use special methods like shielding, grounding and filtering which cause an increase in overall cost. This paper discussed a study of a medium voltage substation whose switching process caused electromagnetic interference to low voltage cables. Three methods of decreasing overvoltage and overcurrent were discussed and compared. Recognition of magnetic fields was accomplished by ANSYS (base on finite element method). In addition, overvoltages during the switching process were calculated by common mode and differential mode equivalent circuit. The purpose of the study was to assist designers and engineers in selecting a suitable method to achieve electromagnetic compatibility in a substation. The paper discussed the amplitude of switching currents; common mode current; and methods of reducing overvoltages and overcurrents. These methods included differential mode current and shielding. It was concluded that several methods exist to protect a substations against electromagnetic interference effects. An important problem is the structure of switching in a substation that determines the strength of electromagnetic interference. A substation designer can chose the best way to achieve EMC by considering a switching structure that depends on system topology and cost function of the selected method. 7 refs., 17 figs.

  5. Klondike III/Biglow Canyon Wind Integration Project; Final Environmental Impact Statement, September 2006.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    2006-09-01

    BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated from the proposed Klondike III Wind Project to the Federal Columbia River Transmission System. Orion Energy LLC has also asked BPA to interconnect 400 MW of electricity from its proposed Biglow Canyon Wind Farm, located north and east of the proposed Klondike III Wind Project. (Portland General Electric recently bought the rights to develop the proposed Biglow Canyon Wind Farm from Orion Energy, LLC.) Both wind projects received Site Certificates from the Oregon Energy Facility Siting Council on June 30, 2006. To interconnect these projects, BPA would need to build and operate a 230-kV double-circuit transmission line about 12 miles long, expand one substation and build one new substation. The wind projects would require wind turbines, substation(s), access roads, and other facilities. Two routes for the transmission line are being considered. Both begin at PPM's Klondike Schoolhouse Substation then travel north (Proposed Action) or north and westerly (Middle Alternative) to a new BPA 230-kV substation next to BPA's existing John Day 500-kV Substation. BPA is also considering a No Action Alternative in which BPA would not build the transmission line and would not interconnect the wind projects. The proposed BPA and wind projects would be located on private land, mainly used for agriculture. If BPA decides to interconnect the wind projects, construction of the BPA transmission line and substation(s) could commence as early as the winter of 2006-07. Both wind projects would operate for much of each year for at least 20 years. The proposed projects would generally create no or low impacts. Wildlife resources and local visual resources are the only resources to receive an impact rating other than ''none'' or ''low''. The low to moderate impacts to wildlife are from the expected bird and bat mortality and the cumulative

  6. Meeting the challenges of managing substation equipment assets

    Energy Technology Data Exchange (ETDEWEB)

    Shaver, J. [CEA Technologies (Canada)

    2005-06-01

    Best practices for monitoring and assessing substation equipment are discussed. Scheduled time-based maintenance is the most common, but recent evidence indicates that despite it being the most expensive, it may not always identify potential failures. The author recommends developing decision-making tools that take into account obsolescence, reliability, safety and environmental issues, as well as operating, repair and carrying costs, as absolutely necessary for consistent and intelligent decision-making. Given the high cost of research, the author recommends developing such tools through pooling of skills and collaboration with other utilities, as the preferred way to develop best practices. The Life Cycle Management of Substation Equipment and Apparatus Interest Group of CEA Technologies Inc is one such group that was formed to help utilities facilitate their research and technology development endeavours. The group's current focus is on developing equipment diagnostics and life optimization through the development of validation tools for predicting remaining life and/or extending life. Brief descriptions of these, and other completed project are given. Completed projects described include developing tools for predicting remaining life of transformers, power connectors and disconnect switches, safety protocol for restoration of substations involved with fires/explosions, and compiling a critical review of diagnostic instruments designed to assess transformer conditions.

  7. Improved district heating substation efficiency with a new control strategy

    International Nuclear Information System (INIS)

    Gustafsson, Jonas; Delsing, Jerker; Deventer, Jan van

    2010-01-01

    In this paper, we describe a new alternative control approach for indirectly connected district heating substations. Simulations results showed that the new approach results in an increased ΔT across the substation. Results were obtained for both ideal and non-ideal operation of the system, meaning that less water must be pumped through the district heating network, and a higher overall fuel efficiency can be obtained in the district heating power plants. When a higher fuel efficiency is achieved, the usage of primary fuel sources can be reduced. Improved efficiency also increases the effective heat transfer capacity of a district heating network, allowing more customers to be connected to an existing network without increasing the heating plant or network capacity. Also, if combined heat and power plants are used to produce the heat, the increased ΔT will result in a further improved overall fuel efficiency, as more electricity can be produced with colder cooling water. The idea behind the new control method is to consider the temperature of the water supplying the district heating substation with heat, often referred to as the primary supply temperature. This represents a logical next step, as currently, the only parameter generally taken into account or measured when controlling the temperature level of the radiator circuit is the local outdoor temperature. In this paper we show how the primary supply temperature together with thermodynamic knowledge of the building can be used to maximize the ΔT across the district heating substation.

  8. Evaluation of the Optimal Connection of Power Transformers in the Substations of a Hospital

    Directory of Open Access Journals (Sweden)

    Carlos Javier Renedo

    2018-02-01

    Full Text Available Transformers are installed in power distribution systems to perform changes in supply voltage. Large consumers often have several transformers installed in parallel to ensure continuity of supply in the event of failure. These machines can achieve very high efficiency, but their efficiency is not constant since it depends on the power demanded at each time. Therefore, the level of efficiency that correspond to the operation of a specific transformer depends on two factors: machine technical characteristics and electrical load. In this work, the authors have proposed a methodology which shows the optimal number of transformers to be connected at each period in the substations of a large Spanish hospital, in order to achieve the maximum seasonal efficiency of these machines. The results of the energy saving are determined with respect to the current situation, in which all the transformers are permanently connected. On the other hand, the European Union has established a new regulation that sets the minimum energy efficiency requirements for new power transformers. This efficiency improvement is proposed to be applied gradually in two stages, a first limit came into force in 2015, while a more restrictive approach will appear in the year 2021. This work has also studied the potential energy savings that would occur when the substations of the hospital have more efficient transformers complying with the new European Regulation 548/2014.

  9. Radio interference and transient field from gas-insulated substations

    International Nuclear Information System (INIS)

    Harvey, S.M.; Wong, P.S.; Balma, P.M.

    1995-01-01

    Gas-insulated substations (GIS), owing to their compact nature, offer an attractive alternative to conventional substations in areas where space is limited, such as in urban areas. Consequently, it is important to address the issue of environmental conditions within the substation and in the surrounding areas. This paper reports the result of radio interference (RI) and transient field measurements at two GIS in Ontario, Canada. For comparison with RI levels taken at the GIS, RI levels outside two hospitals in the Toronto area were also measured. The transient field study covers electromagnetic interference (EMI) levels generated during switching operations, and includes measurements inside and outside the GIS. Measurements show that RI levels from the GIS were either below background levels, or contributed little to the background. RI levels outside the GIS and the hospitals were similar. Peak transient field values up to 580 V/m were measured inside the station building, and dropped to background values of 10 V/m at about 120 m from the station. The transient field (E) dropped off at a rate of 3/2 power with distance (d) from the air-insulated 115 kV bus, i.e. E ∝ d -1.5

  10. Mitigation of Transient Overvoltages Generated Due to Switching Operations and Lightning in Gas-insulated Substation (GIS Without Extra Limiter

    Directory of Open Access Journals (Sweden)

    A. Tavakoli

    2011-09-01

    Full Text Available Gas-insulated substations (GIS have different specifications in proportion to air-insulated substations. Transformer failures related to lightning and switching are often reported in the gas insulated substation (GIS. This problem is the voltage magnifications due to reflections of switching and lightning surges at various junctions within the GIS. thereby overvoltages in GIS are more important than air-insulated substation. There are methods to suppress the stresses created by lightning and switching. However, these methods are suitable before installing the substation and during the substation design period. This paper presents feasible methods for mitigation of the overvoltage magnitude. The advantages of the proposed methods are their simplicity and low cost for implantation along with producing minimal changes in the installed GIS.

  11. Reducing LTE Uplink Transmission Energy by Allocating Resources

    DEFF Research Database (Denmark)

    Lauridsen, Mads; Jensen, Anders Riis; Mogensen, Preben

    2011-01-01

    The effect of physical resource block (PRB) allocation on an LTE modem's transmit power and total modem energy consumption is examined. In this paper the uplink resource blocks are scheduled in either a Frequency Division Multiple Access (FDMA) or Time Division Multiple Access (TDMA) manner......, to determine if low transmission power & long transmission time or high transmission power & short transmission time is most energy efficient. It is important to minimize the LTE modem's energy consumption caused by uplink transmission because it affects phone battery time, and because researchers rarely focus...

  12. Insulation coordination workstation for AC and DC substations

    International Nuclear Information System (INIS)

    Booth, R.R.; Hileman, A.R.

    1990-01-01

    The Insulation Coordination Workstation was designed to aid the substation design engineer in the insulation coordination process. The workstation utilizes state of the art computer technology to present a set of tools necessary for substation insulation coordination, and to support the decision making process for all aspects of insulation coordination. The workstation is currently being developed for personal computers supporting OS/2 Presentation Manager. Modern Computer-Aided Software Engineering (CASE) technology was utilized to create an easily expandable framework which currently consists of four modules, each accessing a central application database. The heart of the workstation is a library of user-friendly application programs for the calculation of important voltage stresses used for the evaluation of insulation coordination. The Oneline Diagram is a graphic interface for data entry into the EPRI distributed EMTP program, which allows the creation of complex systems on the CRT screen using simple mouse clicks and keyboard entries. Station shielding is graphically represented in the Geographic Viewport using a three-dimensional substation model, and the interactive plotting package allows plotting of EPRI EMTP output results on the CRT screen, printer, or pen plotter. The Insulation Coordination Workstation was designed by Advanced Systems Technology (AST), a division of ABB Power Systems, Inc., and sponsored by the Electric Power Research Institute under RP 2323-5, AC/DC Insulation Coordination Workstation

  13. Transmission : key to the Alberta market

    International Nuclear Information System (INIS)

    Lyons, D.

    2003-01-01

    AltaLink is Canada's first independent transmission company with 11,000 kilometres (km) of lines and 250 substations. It possesses a unique ownership structure with strong technical partners and financial capability. No major transmission system has been built in the last fifteen years in Alberta. The author examined the situation of power transmission in Alberta, indicating that developments should include capacity increase out of Fort McMurray, and better market integration with both British Columbia and the Pacific Northwest. An efficient and effective market requires ample transmission capacity, which would allow for trade and competition, access for efficient generators, and access to regional markets. New transmission must be planned and achieved in a proactive manner. Generation developers must be assured that transmission will be available, and that tariffs and loss factors will be predictable and stable. figs

  14. Helping utilities harness the power of the web for substation automation

    Energy Technology Data Exchange (ETDEWEB)

    Finney, D.

    2000-11-01

    The significance of the Internet to the deregulated electric power industry and the ability to tap into the benefits of Web-enabled substation monitoring and control are reviewed. It is this author's contention that the convergence of Internet access from PCs, servers and Internet-ready intelligent electronic devices make it possible to have full-scale substation automation and control without the high price tag associated with SCADA systems. Whereas in the past automation solutions were thought to be appropriate only for big utilities, the potential of the Internet such as the GE-hosted enerVista.com service, which is made up of a number of modules which can provide many of the services of a complex enterprise management system at a fraction of the cost, make it possible for smaller utilities to overcome substation automation problems at an affordable cost. By having the communications link over the web, and data acquisition hosted by an outside vendor, even the smallest municipal utility can have the most up-to-date equipment at their disposal, and expand their control to SCADA-level functionality without having to incur the usual programming and technology costs. The example of Whitby Hydro to automate their three substation system with GE Power Management's Universal Relay (UR) intelligent electronic device system by installing a modem as an Internet appliance for 24/7 monitoring, optional protection and control, is cited. Utilities in Oshawa and Thunder Bay, Ontario, and others in New York State and Tennessee, are some of the other utilities currently involved in developing web-based applications that address their unique requirements. At present, there appears to be no limit to the role that the Internet can play in substation automation and control for utilities competing in a global market.

  15. Accurately Localize and Recognize Instruments with Substation Inspection Robot in Complex Environments

    Directory of Open Access Journals (Sweden)

    Hui Song

    2014-07-01

    Full Text Available This paper designs and develops an automatic detection system in the substation environment where complex and multi-inspecting objects exist. The inspection robot is able to fix and identify the objects quickly using a visual servo control system. This paper focuses on the analysis of fast lockup and recognition method of the substation instruments based on an improved Adaboost algorithm. The robot adjusts its position to the best view point and best resolution for the instrument in real-time. The dial and pointer of the instruments are detected with an improved Hough algorithm, and the angle of the pointer is converted to the corresponding readings. The experimental results indicate that the inspection robot can fix and identify the substation instruments quickly, and has a wide range of practical applications.

  16. A novel approach to verify the influence of atmospheric parameters in substations concerning lightning

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Andre Nunes de; Silva, Ivan Nunes da; Ulson, Jose Alfredo C.; Zago, Maria Goretti [UNESP, Bauru, SP (Brazil). Dept. de Engenharia Eletrica]. E-mail: andrejau@bauru.unesp.br

    2001-07-01

    This paper demonstrates that artificial neural networks can be used effectively for estimation of parameters related to study of atmospheric conditions to high voltage substations design. Specifically, the neural networks are used to compute the variation of electrical field intensity and critical disruptive voltage in substations taking into account several atmospheric factors, such as pressure, temperature, humidity. Examples of simulation of tests are presented to validate the proposed approach. The results that were obtained by experimental evidences and numerical simulations allowed the verification of the influence of the atmospheric conditions on design of substations concerning lightning. (author)

  17. The smart kiosk substation for Smart Grids; Die intelligente Ortsnetzstation fuer das Smart Grid

    Energy Technology Data Exchange (ETDEWEB)

    Weber, Thomas [Schneider Electric Energy GmbH, Frankfurt (Germany); Vaupel, Steffen [Schneider Electric Energy GmbH, Kassel (Germany)

    2012-07-01

    The changes in the energy supply towards current and future needs call for new technologies and solutions resulting in the ''Smart Grid''. The smart kiosk substation describes an essential component for the additionally required optimization of the energy distribution networks - a complete functional unit of an economic and efficient compact substation, which successfully operates within the framework of a pilot project since the beginning of this year. In addition to an adjustable 630-kVA-local distribution transformer, control and signalling functions, to manage fault situations are included, allowing for the optimization of outage times. Measurement of network quality and an economic network protection complete the range of services. As is customary during the development of new products, high availability and free of maintenance (through utilization of standard components) whilst complying with current standards and regulations are being taken into account. Along with the demand for regenerative feed-ins to feed reactive power into the network as required, the regulating device allows for a much improved use of the voltage limits - in the low voltage grid as well. It is to be expected that the network expansion of the low voltage grid thus can be significantly optimized through these possibilities of regulation. (orig.)

  18. The environmental evaluation of substation based on the fuzzy analytic hierarchy process

    Science.gov (United States)

    Qian, Wenxiao; Zuo, Xiujiang; Chen, Yuandong; Ye, Ming; Fang, Zhankai; Yang, Fan

    2018-02-01

    This paper studies on the different influences on the environment of the substations and puts forward an index system of environmental protection through the fuzzy analytic hierarchy process. A comprehensive environmental evaluation on a substation is carried out through investigation and measurement of the current environmental factors, and the statistical data has validated the effectiveness and feasibility of this evaluation index system. The results indicate that the proposed model has high efficiency.

  19. Static Electricity as Part of Electromagnetic Environment on High-Voltage Electrical Substation

    Directory of Open Access Journals (Sweden)

    M. I. Fursanov

    2012-01-01

    Full Text Available Causes of occurrences electrostatic discharges (ESD on high-voltage electric substation were investigated and dependences values ESD’s on parameters interaction structures, humidity of air were found. Experimental research values ESD’s on high-voltage electric substation and in man-made conditions was fulfilled. Uncertainty measurement’s was taken into consideration by research results analyze. Matching with research of other authors was made. Danger ESD’s for electric devises was established.

  20. Research on the Best Root Span of 500kV Substation Frame Based on Finite Element

    Science.gov (United States)

    Chen, Hao; Fang, Qing; Chen, Haoyuan

    2018-01-01

    A-shaped and steel tube structures have been widely applied when designing 500kV substation frame in China. While, compared with steel tube, angle steels have an advantage of easy-transporting, especially in oversea projects. However, researches on substation frame with angle steel were not enough. In order to find out the best root span of 500kV substation frame under similar engineering conditions, using the overseas project substation frame as an example, the substation frames with different root span have been detailed calculated, to find the best root span according to the cost of it. When the height of column is about 30m, the root suggestion value is 6.1m×3.1m. And then, the buckling analysis of the overall structure has been carried out by ANSYS, to find out that the weak part of the structure is in the middle of it. The structural adjustment is carried out for the weak part, including adjusting the web members and the chord members, to obtain a higher bearing capacity of the structure.

  1. Uncertainty models applied to the substation planning

    Energy Technology Data Exchange (ETDEWEB)

    Fontoura Filho, Roberto N [ELETROBRAS, Rio de Janeiro, RJ (Brazil); Aires, Joao Carlos O; Tortelly, Debora L.S. [Light Servicos de Eletricidade S.A., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    The selection of the reinforcements for a power system expansion becomes a difficult task on an environment of uncertainties. These uncertainties can be classified according to their sources as exogenous and endogenous. The first one is associated to the elements of the generation, transmission and distribution systems. The exogenous uncertainly is associated to external aspects, as the financial resources, the time spent to build the installations, the equipment price and the load level. The load uncertainly is extremely sensible to the behaviour of the economic conditions. Although the impossibility to take out completely the uncertainty , the endogenous one can be convenient treated and the exogenous uncertainly can be compensated. This paper describes an uncertainty treatment methodology and a practical application to a group of substations belonging to LIGHT company, the Rio de Janeiro electric utility. The equipment performance uncertainty is treated by adopting a probabilistic approach. The uncertainly associated to the load increase is considered by using technical analysis of scenarios and choice criteria based on the Decision Theory. On this paper it was used the Savage Method and the Fuzzy Set Method, in order to select the best middle term reinforcements plan. (author) 7 refs., 4 figs., 6 tabs.

  2. Practical experience with IEEE 1588 high precision time synchronization in electrical substation based on IEC 61850 process bus

    Energy Technology Data Exchange (ETDEWEB)

    Moore, R.; Goraj, M.J.; McGhee, J. [RuggedCom Inc., Concord, ON (Canada)

    2010-07-01

    This paper discussed a time synchronization and dynamic multicast filtering procedure conducted on an IEC 61850 process bus. The Institute of Electrical and Electronic (IEEE) 1588 time synchronization and dynamic multicast filtering procedure was conducted at a substation equipped with non-conventional instrument transformers (NCIT) and intelligent circuit breakers. The process bus interconnected IEDs within a bay that included a real time sampled value (SV) measurement system. The system was designed to reduce the use of copper wiring and to eliminate high energy signal processes. Digitized sampled measured values were sent from the electronic instrument transformers to protect and control relays. A merging unit was used to enable the transmission of the digitized current and voltage measurements across an ethernet network. Two sampling rates were supplied for power system monitoring and protection applications. The merging units continuously sent sampling values of current and voltages acquired from primary equipment. Precision time protocol systems were discussed, and issues related to time synchronization were reviewed. A network topology was provided. 4 refs., 4 figs.

  3. Toward a methodology for substate projections of registered nurse supply and demand in New York.

    Science.gov (United States)

    McGinnis, Sandra; Martiniano, Robert; Moore, Jean

    2010-01-01

    Even as concerns about nursing shortages continue nationwide and for individual states in the United States, there is little information on the impact of nursing shortages at substate levels, such as counties or groups of small counties. National and state level assessments can mask wide geographic variation in the distribution of registered nurses (RNs). The Center for Health Workforce Studies at the School of Public Health, University at Albany, developed a practical approach to projecting RN supply and demand at substate levels. The experimental model used in this research was adapted from a methodology utilized for the RN National Supply Model and National Demand Model developed by the Health Resources and Services Administration in the department of Health and Human Services to make RN supply and demand projections at the broader national and state levels. The Center's research highlighted the value of substate analyses in the identification of RN supply and demand gaps and found that supply and demand gaps vary greatly by region and within regions. This study also provided an in-depth understanding of the dynamics that drive substate labor markets for RNs as well as the need for substate analyses to help policymakers better allocate scarce resources to address nursing shortages.

  4. A literature survey on asset management in electrical power [transmission and distribution] system

    OpenAIRE

    Khuntia, S.R.; Rueda Torres, José L.; Bouwman, S.; van der Meijden, M.A.M.M.

    2016-01-01

    Asset management is one of the key components in a transforming electric power industry. Electric power industry is undergoing significant changes because of technical, socio-economical and environmental developments. Also, because of restructuring and deregulation, the focus has been on transmission and distribution assets that include transmission lines, power transformers, protection devices, substation equipment and support structures. This study aims to provide a detailed exposure to ass...

  5. Fault diagnosis methods for district heating substations

    Energy Technology Data Exchange (ETDEWEB)

    Pakanen, J.; Hyvaerinen, J.; Kuismin, J.; Ahonen, M. [VTT Building Technology, Espoo (Finland). Building Physics, Building Services and Fire Technology

    1996-12-31

    A district heating substation is a demanding process for fault diagnosis. The process is nonlinear, load conditions of the district heating network change unpredictably and standard instrumentation is designed only for control and local monitoring purposes, not for automated diagnosis. Extra instrumentation means additional cost, which is usually not acceptable to consumers. That is why all conventional methods are not applicable in this environment. The paper presents five different approaches to fault diagnosis. While developing the methods, various kinds of pragmatic aspects and robustness had to be considered in order to achieve practical solutions. The presented methods are: classification of faults using performance indexing, static and physical modelling of process equipment, energy balance of the process, interactive fault tree reasoning and statistical tests. The methods are applied to a control valve, a heat excharger, a mud separating device and the whole process. The developed methods are verified in practice using simulation, simulation or field tests. (orig.) (25 refs.)

  6. Power substation location selection using fuzzy analytic hierarchy process and PROMETHEE: A case study from Bangladesh

    International Nuclear Information System (INIS)

    Kabir, Golam; Sumi, Razia Sultana

    2014-01-01

    Electromagnetic radiations emanating from the high voltage lines and substations pose serious adverse health consequences to living beings. As a result, selection of power substation location is an important strategic decision-making problem for both public and private sectors. In general, many conflicting factors affect the appropriate substation location selection problem which adheres to uncertain and imprecise data. In this paper, a simple, systematic and logical scientific approach is structured to evaluate power substation location through integrating Fuzzy Analytical Hierarchy Process (FAHP) with the Preference Ranking Organization Method for Enrichment Evaluations (PROMETHEE). The proposed integrated approach provides more realistic and reliable results, and facilitates the decision-maker to handle multiple contradictory decision perspectives through eliminating the limitations of FAHP and PROMETHEE methods. To accredit the proposed model, it is implemented in a power substation location selection problem in Bangladesh. - Highlights: • Integrate the strengths and eliminate the limitations of FAHP and PROMETHEE. • Consider social, technological, economic, environmental, and site characteristics criteria. • Determine the weights of criteria and sub-criteria using FAHP. • Present both PROMETHEE I and PROMETHEE II ranking. • Enable graphical representation of the alternatives and criteria by GAIA plane

  7. 29 CFR 1926.957 - Construction in energized substations.

    Science.gov (United States)

    2010-07-01

    ... Distribution § 1926.957 Construction in energized substations. (a) Work near energized equipment facilities. (1... lines. When it is necessary to deenergize equipment or lines for protection of employees, the... large electrical equipment, transformers, or breakers. (f) Storage. The storage requirements of § 1926...

  8. Life Cycle Assessment on a 765 kV Venezuelan Transmission System

    International Nuclear Information System (INIS)

    Wang, Wenlu; Tremouille, Gilles; Beroual, Abderrahmane; Bessede, Jean-Luc

    2011-03-01

    The demand to preserve the environment and form a sustainable development is greatly increasing in the recent decades all over the world, and this environmental concern is also merged in electrical power industry, resulting in many eco-design approaches in T and D industries. As a method of eco-design, Life Cycle Assessment (LCA) is a systematic tool that enables the assessment of the environmental impacts of a product or service throughout its entire life cycle, i.e. raw material production, manufacture, distribution, use and disposal including all intervening transportation steps necessary or caused by the product's existence. In T and D industries, LCA has been done for a lot of products individually, in order to see one product's environmental impacts and to seek for ways of improving its environmental performance. This eco-design for product approach is a rather well-developed trend, however, as only a single electrical product cannot provide the electrical power to users, electrical system consists of a huge number of components, in order to investigate system's environmental profile, the entire environmental profiles of different composing products has to be integrated systematically, that is to say, a system approach is needed. Under this philosophy, in this paper, an LCA using SimaPro (one kind of LCA software) is conducted on a whole Venezuelan 765 kV AC transmission system, which transmits 8000 MW hydro-electrical power through 760 km to this country's load centers, with total 7 substations, i.e. one sending end, 2 intermediate substations and 4 receiving ends. This LCA includes both transmission lines and substations, and then the environmental impacts of the whole transmission system are investigated. (authors)

  9. IEC 61850: integrating substation automation into the power plant control system; IEC 61850: Integration der Schaltanlagenautomatisierung in die Kraftwerksleittechnik

    Energy Technology Data Exchange (ETDEWEB)

    Orth, J. [ABB AG, Mannheim (Germany)

    2008-07-01

    The new communication standard IEC 61850 has been developed in the substation automation domain and was released 2004 as a worldwide standard. Meanwhile IEC 61850 is already established in many substation automation markets. The paper discusses the implementation of IEC 61850 integrating process control and substation automation into one consistent system in a power plant. (orig.)

  10. Final environmental assessment for vegetation control at VHF stations, microwave stations, electrical substations, and pole yards

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-13

    Southwestern Power Adm. operates very high frequency (VHF) and microwave radio stations, electrical substations, and pole yards for electric power transmission throughout AR, MO, and OK. Vegetation growth at the stations must be suppressed for safety of operation and personnel. Southwestern has been using a combination of mechanical/manual and herbicide control for this purpose; Federally- mandated reductions in staff and budgetary resources require Southwestern to evaluate all potentially efficient methods for vegetation control. Three alternatives were examined: no action, mechanical/manual control, and (proposed) a combination of mechanical/manual and herbicide control. Environmental impacts on air and water quality, wetlands, wildlife, endangered species, archaeological and other resources, farmland, human health, transportation, etc. were evaluated.

  11. 30 CFR 56.4130 - Electric substations and liquid storage facilities.

    Science.gov (United States)

    2010-07-01

    ... LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Fire Prevention and Control Prohibitions/precautions/housekeeping § 56.4130 Electric substations...

  12. 78 FR 50405 - Amended Application for Presidential Permit; Northern Pass Transmission LLC

    Science.gov (United States)

    2013-08-19

    ... Pass proposes to construct and operate a primarily overhead high-voltage direct current (HVDC) electric transmission line that would originate at an HVDC converter station to be constructed at the Des Cantons Substation in Qu[eacute]bec, Canada, then would be converted from HVDC to alternating current (AC) in...

  13. Electric and magnetic field measurements in an outdoor electric power substation

    Energy Technology Data Exchange (ETDEWEB)

    Safigianni, A.S.; Tsompanidou, C.G. [Democritus Univ. Thrace, Xanthi (Greece). Dept. of Electrical and Computer Engineering

    2006-07-01

    With the ever increasing environmental exposure to man-made electromagnetic fields (EMFs), public concern regarding the potential health hazards of exposure to electric and magnetic fields at extremely low frequencies (ELF) has also increased. This paper examined the ELF fields at a 150/20 kV outdoor electric power substation in Xanthi, Greece. Basic data regarding this substation was provided along with previous relevant research studies. The reference levels for safe general public and occupational exposure according to the International Commission on Non-Ionizing Radiation Protection (ICNIRP) was also presented. The instruments used to take the measurements were described and indicative results of the EMFs measurements in the substation were provided. In general, the measured magnetic flux density values were far below the reference level for safe public and occupational exposure. No significant differentiation was noted in these values in relation to body height. However, the levels were found to be in violation in two positions, near the capacitor banks. It was emphasized that these values greatly decreased with distance, and the positions where these high values were measured were not occupied by technicians when the capacitors were under voltage. In addition, it was emphasized that the measured magnetic flux density values were very small in the supervision room, where the supervisor of the substation works and in the ring zone where the public has access. All the measured electric field strength values were below the reference level for safe public and occupational exposure. It was concluded that the measured field values are within recognized guidelines and pose no danger for public or working personnel. 19 refs., 1 tab., 4 figs.

  14. Electric and magnetic field testing in vicinity of 110/x kV substations

    Directory of Open Access Journals (Sweden)

    Grbić Maja

    2016-01-01

    Full Text Available The levels of non-ionizing radiation (electric and magnetic fields at power frequency, which occur near 110/x kV substations are analyzed in this paper. The results of electric field strength and magnetic flux density measurements in the vicinity of three typical substations of the aforementioned voltage level are shown. With the purpose of estimating the exposure of the population to these fields, the obtained results were compared to the reference maximum levels set for increased sensitivity areas, which amount to 2 kV/m for electric field and 40 μT for magnetic flux density. The objective of the conducted analysis is to reach general conclusions on the levels of electric and magnetic fields, which may occur in the vicinity of the substations mentioned above, and evaluate their compliance with the national regulations on the population protection from non-ionizing radiation.

  15. Automatic Voltage Control (AVC) of Danish Transmission System - Concept design

    DEFF Research Database (Denmark)

    Qin, Nan; Abildgaard, Hans; Lund, P.

    2014-01-01

    For more than 20 years it has been a consistent plan by all Danish governments to turn the Danish power production away from fossil fuels towards renewable energy. The result today is that 37% of the total Danish power consumption was covered by mainly wind energy in 2013 aiming at 50% by 2020......, objectives, constraints, algorithms for optimal power flow and some special functions in particular systems, which inspires the concept design of a Danish AVC system to address the future challenges of voltage control. In the concept, the Danish AVC design is based on a centralized control scheme. All...... the substation loses the telecommunications to the control center. RPCs will be integrated to the AVC system as normative regulators in the later stage. Distributed generation units can be organized as virtual power plants and participate in voltage control at transmission level. Energinet.dk as the Danish TSO...

  16. Microwave energy transmission system for solar power station

    Energy Technology Data Exchange (ETDEWEB)

    Matsumoto, Hiroshi

    1988-05-05

    This paper deals with a microwave wireless energy transmission system which will be required for a solar power station under investigation, particularly, it describes its foundation and future investigation. It is supposed that for realization of microwave wireless transmission techniques, it is most important to investigate the effect of strong microwave beams on a plasma environment, establish control techniques for microwave beams in which a retro-directive system is combined with a computer control system, and develop a semiconductor transmission module. Institute of Space and Astronautical Science (Japan) made an experiment on the effect of microwaves on ionospheric plasma by using an observatory rocket. The institute has planned to make an experiment on a microwave energy transmission system which is to be mounted to a small-scale space flyer unit in order to examine the control of microwave beams and 10 KW power transmission, in addition to investigation on the interaction of microwave energy beams with a plasma environment. (4 figs, 3 tabs, 20 refs)

  17. Algorithms for the evaluation of the reliability of networks and substations; Algoritmos para evaluar la confiabilidad de redes y subestaciones electricas

    Energy Technology Data Exchange (ETDEWEB)

    Vega Ortiz, Miguel [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2001-07-01

    Two algorithms are presented, one for analyzing the reliability of networks and another one to analyzing the reliability of electrical substations. The algorithms model a network or a substation by means of a graph and determine all the exits, of up to third degree, which isolates the load points. The algorithm that is used for the network analysis, is the one of p-cuts and in the case of the substations it is the one of minimum ways, for later, from these minimum p-cuts and of the minimum ways, obtains the minimum cuts. These minimum cuts are evaluated with the approximate method and give as a result the system reliability and of each one of the components that have been modeled. At the end some examples and results obtained are shown. As case of study, the algorithm is applied to two substations arrangements and to a network of industrial distribution, but it is possible to be applied to transmission and distribution networks. [Spanish] Se presentan dos algoritmos, uno para analizar la confiabilidad de redes y otro para analizar la confiabilidad de subestaciones electricas. Los algoritmos modelan una red o una subestacion por medio de un grafo y determinan todas las salidas, de hasta tercer grado, que aislan los puntos de carga. El algoritmo que se utiliza para el analisis de redes, es el de p-cortes y en el caso de las subestaciones es el de caminos minimos, para despues, a partir de estos p-cortes minimos y de los caminos minimos, obtener los cortes minimos. Estos cortes minimos se evaluan con el metodo aproximado y dan como resultado la confiabilidad del sistema y de cada una de las componentes que se hayan modelado. Al final se muestran algunos ejemplos y resultados obtenidos. Como caso de estudio, el algoritmo se aplica a dos arreglos de subestaciones y a una red de distribucion industrial, pero se puede aplicar a redes de transmision y de distribucion.

  18. ENEL high and medium voltage electrical substations for power supply to urban centers

    International Nuclear Information System (INIS)

    Bargigia, A.; Boatto, C.; Di Mario, A.; Fava, N.; Sciarra, S.; Speziali, R.

    1991-12-01

    Modular high and medium voltage gas insulated electrical substations are being used by ENEL (Italian Electricity Board) to meet the specific needs of urban centers with special design and sizing constraints of a historical/architectural nature. This paper illustrates the key design, construction operation and performance characteristics of these standardized units. The descriptions include brief notes on equipment-transformer interconnection, interchangeability and environmental compatibility. Performance test procedures and results of actual reliability and certification tests on some substations are reported

  19. Alternative approaches to transmission investment

    Energy Technology Data Exchange (ETDEWEB)

    Thon, S. [AltaLink Management Ltd., Calgary, AB (Canada)

    2004-07-01

    AltaLink is Canada's first stand-alone power transmission company, serving all major centres in Alberta and 85 per cent of Alberta's population. It has more than $1 billion in assets, 11,500 km of transmission lines and 300 substations. It was noted that there has not been any significant investment in power transmission in Alberta for the past 20 years, partly because transmission assets have a very long lifespan. The new role of the power grid is to ensure reliability, safety, efficiency, market effectiveness and supply diversity. The benefits and costs of AltaLink's 500 kV North-South upgrade project were outlined. It was noted that a healthy transmission system is the basis for economic growth throughout the province and for the development of Alberta's resource base. The transmission policy in Alberta endorses that all consumers pay postage stamp tariffs. It also promotes a proactive plan for transmission projects, the time to maximum rate (TMR) in limited cases only, a congestion-free grid under normal conditions, the financial commitment of generators, specific time limits on permitting processes, and regional interconnections to benefit all customers. tabs., figs.

  20. Anisotropy in the simultaneous excitation of two colliding atoms to various substate combinations

    International Nuclear Information System (INIS)

    Moorman, L.

    1987-01-01

    In this thesis double-atom excitation (DAE) processes in atomic collision experiments are studied by measuring the angular correlation of two coincident photons emitted by both excited collision particles. The analytical expression for the angular correlation function is derived which contains as adjustable parameters the various (complex) excitation amplitudes integrated over all scattering angles. The He+He system is investigated, for projectile energies between 0.5 and 3.5 keV, in which both particles are excited simultaneously to the 2 1 P state. The relation between photon correlations and atomic state correlations is investigated and the density matrix elements are calculated for a statistical distribution of the excited atomic substates into which a certain symmetry is incorporated. Collisions between metastable and groundstate He atoms are considered. Single-photon spectra are presented and compared with spectra from the He+He collision system. Coincidence measurements were performed on these collision systems to study possible double-atom excitations. Coincidences between two ultraviolet as well as an ultraviolet and a visible photon were measu0515 Also a measurement is reported of the relative population of the magnetic substates of the 3 1 D state of helium. Coincidence measurements on two ultraviolet photons emitted upon Ne-Ne and He-Ne collisions are described and the double-atom excitations for these systems are studied. For Ne+Ne no coincidence peaks were found. For He+Ne double-atom excitation was observed and from the measured angular correlations the corresponding density matrix elements for some kinetic energies of the projectile. (Auth.)

  1. Stochastic energy balancing in substation energy management

    Directory of Open Access Journals (Sweden)

    Hassan Shirzeh

    2015-12-01

    Full Text Available In the current research, a smart grid is considered as a network of distributed interacting nodes represented by renewable energy sources, storage and loads. The source nodes become active or inactive in a stochastic manner due to the intermittent nature of natural resources such as wind and solar irradiance. Prediction and stochastic modelling of electrical energy flow is a critical task in such a network in order to achieve load levelling and/or peak shaving in order to minimise the fluctuation between off-peak and peak energy demand. An effective approach is proposed to model and administer the behaviour of source nodes in this grid through a scheduling strategy control algorithm using the historical data collected from the system. The stochastic model predicts future power consumption/injection to determine the power required for storage components. The stochastic models developed based on the Box-Jenkins method predict the most efficient state of the electrical energy flow between a distribution network and nodes and minimises the peak demand and off-peak consumption of acquiring electrical energy from the main grid. The performance of the models is validated against the autoregressive moving average (ARIMA and the Markov chain models used in previous work. The results demonstrate that the proposed method outperforms both the ARIMA and the Markov chain model in terms of forecast accuracy. Results are presented, the strengths and limitations of the approach are discussed, and possible future work is described.

  2. INTELLIGENT DIAGNOSTIC SYSTEM OF EMERGENCY SITUATIONS IN TRACTION SUBSTATIONS DC

    Directory of Open Access Journals (Sweden)

    Sh. N. Nasyrov

    2009-09-01

    Full Text Available In the article the architecture and algorithm of operating an expert system providing the efficiency of functioning the electric equipment for traction substation as well as the four-parameter belonging function are determined.

  3. Great Plains Wind Energy Transmission Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

    2012-06-09

    In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task

  4. Predictive Maintenance of Power Substation Equipment by Infrared Thermography Using a Machine-Learning Approach

    Directory of Open Access Journals (Sweden)

    Irfan Ullah

    2017-12-01

    Full Text Available A variety of reasons, specifically contact issues, irregular loads, cracks in insulation, defective relays, terminal junctions and other similar issues, increase the internal temperature of electrical instruments. This results in unexpected disturbances and potential damage to power equipment. Therefore, the initial prevention measures of thermal anomalies in electrical tools are essential to prevent power-equipment failure. In this article, we address this initial prevention mechanism for power substations using a computer-vision approach by taking advantage of infrared thermal images. The thermal images are taken through infrared cameras without disturbing the working operations of power substations. Thus, this article augments the non-destructive approach to defect analysis in electrical power equipment using computer vision and machine learning. We use a total of 150 thermal pictures of different electrical equipment in 10 different substations in operating conditions, using 300 different hotspots. Our approach uses multi-layered perceptron (MLP to classify the thermal conditions of components of power substations into “defect” and “non-defect” classes. A total of eleven features, which are first-order and second-order statistical features, are calculated from the thermal sample images. The performance of MLP shows initial accuracy of 79.78%. We further augment the MLP with graph cut to increase accuracy to 84%. We argue that with the successful development and deployment of this new system, the Technology Department of Chongqing can arrange the recommended actions and thus save cost in repair and outages. This can play an important role in the quick and reliable inspection to potentially prevent power substation equipment from failure, which will save the whole system from breakdown. The increased 84% accuracy with the integration of the graph cut shows the efficacy of the proposed defect analysis approach.

  5. Overview of electrical energy in October 2003

    International Nuclear Information System (INIS)

    2003-01-01

    The purpose of this document is to provide information concerning the operation of the French public transmission network and power system during the past month. The data published are interim figures dated 10 November 2003. National electrical consumption in France: national consumption is the total of all the electrical energy supplied for consumption in France (including Corsica, but not the French Overseas Departments), thermal and hydro generation + imports - exports - pumping, and which have been consumed in the transmission and distribution networks, by the end-users, as well as by losses. National consumption for the month of October 2002 rose by 6.0% compared with October 2002, mainly due to increased use of heating. The average monthly temperature fell by 2.1 deg. C compared with October 2002. Adjusted for climatic contingencies, monthly consumption rose by 0.4% compared with October 2002. In cumulative figures over 12 months, the rate of growth in adjusted consumption rose by 0.2% since last month, and the rate of growth in gross national consumption remained stable. The energy balance recorded by the transmission network (RTE) takes into account only the energy physical flows conveyed on the RTE network. In October 2003, consumption in France rose compared with October 2002, mainly as a result of increased extractions from the distributions systems (+2.2 TWh). Compared with October 2002, monthly injections increased (+ 0.5 TWh), due to the combined effects of a substantial rise in thermal generation (+0.8 TWh) and imports (+0.5 TWh), and a drop in hydro-electric generation (-0.8 TWh). Exports were down by 1.7 TWh. France remained a net exporter to neighbouring countries throughout the month of October. Consumption and physical exchanges, noteworthy data (these values reflect all the flows on the RTE network, as well as the generation auto-consumed by the industrial consumers connected to this network); the electricity market; the market players

  6. Pricing and Capacity Planning Problems in Energy Transmission Networks

    DEFF Research Database (Denmark)

    Villumsen, Jonas Christoffer

    strategy. In the Nordic electricity system a market with zonal prices is adopted. We consider the problem of designing zones in an optimal way explicitly considering uncertainty. Finally, we formulate the integrated problem of pipeline capacity expansion planning and transmission pricing in natural gas...... necessitates a radical change in the way we plan and operate energy systems. Another paradigm change which began in the 1990’s for electricity systems is that of deregulation. This has led to a variety of different market structures implemented across the world. In this thesis we discuss capacity planning...... and transmission pricing problems in energy transmission networks. Although the modelling framework applies to energy networks in general, most of the applications discussed concern the transmission of electricity. A number of the problems presented involves transmission switching, which allows the operator...

  7. Availability analysis of high voltage substations considering its main equipment; Analise de disponibilidade de subestacoes de alta tensao considerando seus principais equipamentos

    Energy Technology Data Exchange (ETDEWEB)

    Santos, R.C. [Universidade Federal do ABC (UFABC), Santo Andre, SP (Brazil)], E-mail: ricardo.santos@ufabc.edu.br; Basseto, B.A.; Cugnasca, P.S.; Almeida Junior, J.R.; Camargo Junior, J.B. [Universidade de Sao Paulo (USP), SP (Brazil). Escola Politecnica], Emails: ricardo.santos@ufabc.edu.br, joao.camargo@poli.usp.br

    2009-07-01

    This paper evaluates the availability of electric power substations, based on Monte Carlo simulation and Fault Tree Analysis, which can be used in a larger way, considering various scenarios, usually founded. The main fallouts modes considered in the availability analysis of power systems, as well as the main methods applied to reach this goal are discussed. The availability indexes of the Monte Carlos simulation are sufficient to indicate the critical points of the power system, and to make comparisons between different substations, related to the performance levels. Through these indexes it is possible to evaluate the impact of a switching action in a determined substation. For this, the substation studied indexes are compared before and after the switching action be considered to the substation in reference.

  8. Maximal network reliability for a stochastic power transmission network

    International Nuclear Information System (INIS)

    Lin, Yi-Kuei; Yeh, Cheng-Ta

    2011-01-01

    Many studies regarded a power transmission network as a binary-state network and constructed it with several arcs and vertices to evaluate network reliability. In practice, the power transmission network should be stochastic because each arc (transmission line) combined with several physical lines is multistate. Network reliability is the probability that the network can transmit d units of electric power from a power plant (source) to a high voltage substation at a specific area (sink). This study focuses on searching for the optimal transmission line assignment to the power transmission network such that network reliability is maximized. A genetic algorithm based method integrating the minimal paths and the Recursive Sum of Disjoint Products is developed to solve this assignment problem. A real power transmission network is adopted to demonstrate the computational efficiency of the proposed method while comparing with the random solution generation approach.

  9. Measurement of the Magnetic Fields from High-Voltage (230 kV Substations in Tehran and Assessment of Their Effects

    Directory of Open Access Journals (Sweden)

    Mahdieh Sharifi Fard

    2010-06-01

    Full Text Available Introduction: Recent industrial developments in human societies have caused rapid advancements in technologies of production and distribution of electricity, which in turn result in enhancement of power networks and utilization of high voltages. These networks and the high voltages in transfer lines cause the exposure to electric and magnetic fields. In this study, the situation regarding the magnetic fields from high-voltage (230 kV substations in Tehran was investigated. Material and Methods: In this study, 8 high-voltage (230 kV substations were selected (Shous, Shahid Firouzi, Ozgol, Kan, Tehranpars, Azadegan, Ghorkhane and Besat substations. The premises of each substation was divided into some stations and measurements were done in each one. Measurements were done according to the IEEE std 644-1994 Standard in a way that the device, specifically its probe, was kept at a height of 1 meter above the ground surface. Then, we tried to examine the probable effects of exposure to magnetic fields through the Essex questionnaire, with Cronbach coefficient of 94%, completed by the employees of the substations. These questionnaires were completed by substation operators as an exposed group (36 persons and the employees of the office section of the Tehran regional electric company as a witness group (32 persons. Results: The measured density in none of the stations exceeded the standard limits of the International Commission on Non-Ionizing Radiation Protection. With regard to the questionnaire results about mental and neurological, cardiac and respiratory, and gastrointestinal and auditory disorders, we observed significant differences between witness and exposed groups, however, regarding skin allergies, there was no significant difference. Conclusion: Among all control rooms, the highest measured magnetic field was 6.9 mG in the Ozgol Substation Control Room and the lowest was 2 mG in the post of Shahid Firouzi. The control room of Ozgol

  10. Seismic damage in the electrical substations of the Colima state; Dano sismico en las subestaciones electricas del estado de Colima

    Energy Technology Data Exchange (ETDEWEB)

    Mena H, Ulises; Lopez L, Alberto; Guerrero F, Vicente A. [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2004-07-01

    On the 21 of January of 2003, at 20:06:36 hrs (Mexico center time) an earthquake occurred at the Pacific coast with a magnitude of 7.6 degrees in the Richter scale, whose epicenter was located near the state of Colima and it was felt in a large extent of the Mexican Republic. The earthquake caused numerous material damages in the structures (houses, churches, offices, etc) and vital lines, mainly in the infrastructure of the electrical sector of the region, leaving without electrical energy a large part of the nearby populations and some colonies of distant zones such as in Mexico City. The cause of the interruption of the electrical energy was due to the collapse of some of the equipment of 400 and 230 KV of the electrical transmission substations, among which are Manzanillo II and Colima II. With the experience acquired in the earthquake of October 9, 1995 in Manzanillo, in which also the facilities and equipment of the electrical substations were affected considerably, and as a part of the infrastructure project on the analysis of seismic risk of vital lines that is being developed at this moment at the Instituto de Investigaciones Electricas (IIE), it was decided to inspect the electrical substations of the zone, where the greater damages in the facilities and equipment were reported, to analyze and to determine the main causes of their failure. [Spanish] El 21 de enero de 2003, a las 20:06:36 hrs (hora del centro de Mexico) ocurrio un sismo en la costa del Pacifico con una magnitud de 7.6 grados en escala Richter, cuyo epicentro se localizo cerca del estado de Colima y se percibio en gran parte de la republica mexicana. El sismo causo cuantiosos danos materiales en las estructuras (viviendas, iglesias, oficinas, etc) y lineas vitales, principalmente en la infraestructura del sector electrico de la region, dejando sin energia electrica a gran parte de las poblaciones cercanas y algunas colonias de zonas lejanas como es la ciudad de Mexico. La causa del corte de

  11. Magnetic substate populations of product nuclei in the /sup 11/B(d,p)/sup 12/B reaction

    Energy Technology Data Exchange (ETDEWEB)

    Tanaka, M; Ochi, S; Minamisono, T; Mizobuchi, A; Sugimoto, K [Osaka Univ., Toyonaka (Japan). Lab. of Nuclear Studies

    1976-05-31

    Magnetic substate populations of product nuclei in the /sup 11/B(d,p)/sup 12/B reaction have been measured in an energy range Esub(d) = 1.3-3.0 MeV at recoil angles of thetasub(R) = 55/sup 0/, 45/sup 0/ and 27/sup 0/-37/sup 0/. A static magnetic field (3 kG) was applied normal to the reaction plane to keep the nuclear orientation. Quadrupole effects on the implanted /sup 12/B in Ta were utilized to perturb the Zeeman splitting. NMR transitions were induced, and detected by the asymmetry change in the ..beta..-decay of /sup 12/B. From this information, the magnetic substate populations were determined, for the unique assignment of which the sign of the quadrupole interaction had to be known. For this purpose, a p-..gamma.. angular correlation was measured, which determined the alignment of the first excited state of /sup 12/B. A comparison of the present result with theoretical predictions is given, together with the resultant information about j-mixings in the /sup 12/B states.

  12. Study on the system-level test method of digital metering in smart substation

    Science.gov (United States)

    Zhang, Xiang; Yang, Min; Hu, Juan; Li, Fuchao; Luo, Ruixi; Li, Jinsong; Ai, Bing

    2017-03-01

    Nowadays, the test methods of digital metering system in smart substation are used to test and evaluate the performance of a single device, but these methods can only effectively guarantee the accuracy and reliability of the measurement results of a digital metering device in a single run, it does not completely reflect the performance when each device constitutes a complete system. This paper introduced the shortages of the existing test methods. A system-level test method of digital metering in smart substation was proposed, and the feasibility of the method was proved by the actual test.

  13. Renewable Energy Zone (REZ) Transmission Planning Process: A Guidebook for Practitioners

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Nathan [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Flores-Espino, Francisco [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hurlbut, David J. [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-05

    Achieving clean energy goals may require new investments in transmission, especially if planners anticipate economic growth and increased demand for electricity. The renewable energy zone (REZ) transmission planning process can help policymakers ensure their infrastructure investments achieve national goals in the most economical manner. Policymakers, planners, and system operators around the world have used variations of the REZ process to chart the expansion of their transmission networks and overcome the barriers of traditional transmission planning. This guidebook seeks to help power system planners, key decision makers, and stakeholders understand and use the REZ transmission planning process to integrate transmission expansion planning and renewable energy generation planning.

  14. Improved Scheduling Mechanisms for Synchronous Information and Energy Transmission.

    Science.gov (United States)

    Qin, Danyang; Yang, Songxiang; Zhang, Yan; Ma, Jingya; Ding, Qun

    2017-06-09

    Wireless energy collecting technology can effectively reduce the network time overhead and prolong the wireless sensor network (WSN) lifetime. However, the traditional energy collecting technology cannot achieve the balance between ergodic channel capacity and average collected energy. In order to solve the problem of the network transmission efficiency and the limited energy of wireless devices, three improved scheduling mechanisms are proposed: improved signal noise ratio (SNR) scheduling mechanism (IS2M), improved N-SNR scheduling mechanism (INS2M) and an improved Equal Throughput scheduling mechanism (IETSM) for different channel conditions to improve the whole network performance. Meanwhile, the average collected energy of single users and the ergodic channel capacity of three scheduling mechanisms can be obtained through the order statistical theory in Rayleig, Ricean, Nakagami- m and Weibull fading channels. It is concluded that the proposed scheduling mechanisms can achieve better balance between energy collection and data transmission, so as to provide a new solution to realize synchronous information and energy transmission for WSNs.

  15. Decentralized control of transmission rates in energy-critical wireless networks

    KAUST Repository

    Xia, Li

    2013-06-01

    In this paper, we discuss the decentralized optimization of delay and energy consumption in a multi-hop wireless network. The goal is to minimize the energy consumption of energy-critical nodes and the overall packet transmission delay of the network. The transmission rates of energy-critical nodes are adjustable according to the local information of nodes, i.e., the length of packets queued. The multi-hop network is modeled as a queueing network.We prove that the system performance is monotone w.r.t. (with respect to) the transmission rate, thus the “bang-bang” control is an optimal control. We also prove that there exists a threshold type control policy which is optimal. We propose a decentralized algorithm to control transmission rates of these energy-critical nodes. Some simulation experiments are conducted to demonstrate the effectiveness of our approach.

  16. Decentralized control of transmission rates in energy-critical wireless networks

    KAUST Repository

    Xia, Li; Shihada, Basem

    2013-01-01

    In this paper, we discuss the decentralized optimization of delay and energy consumption in a multi-hop wireless network. The goal is to minimize the energy consumption of energy-critical nodes and the overall packet transmission delay of the network. The transmission rates of energy-critical nodes are adjustable according to the local information of nodes, i.e., the length of packets queued. The multi-hop network is modeled as a queueing network.We prove that the system performance is monotone w.r.t. (with respect to) the transmission rate, thus the “bang-bang” control is an optimal control. We also prove that there exists a threshold type control policy which is optimal. We propose a decentralized algorithm to control transmission rates of these energy-critical nodes. Some simulation experiments are conducted to demonstrate the effectiveness of our approach.

  17. Cognitive radio-based transmission energy management in Wi-Fi nodes

    CSIR Research Space (South Africa)

    Olwal, TO

    2012-10-01

    Full Text Available -services. To solve such problems, in part, this study addresses the transmission energy management in Wi-Fi networks. Figure 1: Internet needs of rural communities PROPOSAL A cognitive radio-based transmission energy management (CR-TEM) solution for Wi... is incorporated into the Wi-Fi device to monitor the operation environments. Based on the environmental data, the transmission energy is adaptively adjusted until optimal conditions are achieved. Figure 2 illustrates the fundamentals of the cognitive radio...

  18. 750V DC substation facility of electric railway for PUTRA, Malaysia; Malaysia PUTRA muke DC750V dentetsuyo chokuryu henden setsubi

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-02-29

    The first subway was put into full service operation in Kuara Lumpur, Malaysia on July 21. This east-west subway of 29km runs from Kelana Jaya through the downtown KLCC famous for the twin tower to Terminal PUTRA including 24 stations. As power facilities for the electric railway, 2 receiving substations and 13 DC substations were provided. The subway transforms voltage from 132kV to 33kV at the receiving substations, and from AC 33kV to DC 750V at the DC substations to supply power to trains. Features of these facilities are as follows. (1) Gas-insulated switchgears (GIS) and silicon oil-filled transformers are adopted from the viewpoint of disaster prevention. (2) Regenerative power from trains is consumed by the regenerative resistance equipment (resistor control using GTO device) installed in the substations. (3) The fourth-rail system is adopted as current collection system of trains. (translated by NEDO)

  19. The evolution of the Luz y Fuerza del Centro substations. Volume 2; Evolucion de las subestaciones de Luz y Fuerza del Centro. Volumen 2

    Energy Technology Data Exchange (ETDEWEB)

    Carranza Ramirez, Sergio [Luz y Fuerza del Centro, Mexico, D. F. (Mexico)

    1997-12-31

    This document cites historical background of how the Luz y Fuerza del Centro substations have evolved up to nowadays. A brief description is made of one electric substation, the substation design criteria are mentioned, since it must comply with the requirements of reliability, service continuity, service quality, economy, geographical location, just for mentioning some of them. The more utilized arrangements of the Luz y Fuerza del Centro substations are described. In the same manner, the remote control substations are described mentioning the main elements of this type of substations. Mention is made also of the technological incorporations that have been made to the substations and the perspectives there are from these. One line diagrams of the electric substations are shown, as well as from power plant substations [Espanol] Este documento cita antecedentes historicos de como han evolucionando las subestaciones de Luz y Fuerza del Centro hasta hoy en dia. Se realiza una breve descripcion de una subestacion electrica, se mencionan los criterios de diseno de una subestacion, ya que debe cumplir con los requisitos de confiabilidad, continuidad, calidad del servicio, economia, situacion geografica, por mencionar algunos de estos. Se describen los arreglos de las subestaciones mas utilizados por Luz y Fuerza del Centro. De igual manera se describen las subestaciones telecontroladas mencionando los principales elementos de este tipo de subestaciones. Se mencionan las incorporaciones tecnologicas que se han realizado a las subestaciones y las perspectivas que se tienen de estas. Se muestran diagramas unifilares de subestaciones electricas, al igual que se muestran las plantas de las subestaciones

  20. Regional study on investment for transmission infrastructure in China based on the State Grid data

    Science.gov (United States)

    Wei, Wendong; Wu, Xudong; Wu, Xiaofang; Xi, Qiangmin; Ji, Xi; Li, Guoping

    2017-03-01

    Transmission infrastructure is an integral component of safeguarding the stability of electricity delivery. However, existing studies of transmission infrastructure mostly rely on a simple review of the network, while the analysis of investments remains rudimentary. This study conducted the first regionally focused analysis of investments in transmission infrastructure in China to help optimize its structure and reduce investment costs. Using State Grid data, the investment costs, under various voltages, for transmission lines and transformer substations are calculated. By analyzing the regional profile of cumulative investment in transmission infrastructure, we assess correlations between investment, population, and economic development across the regions. The recent development of ultra-high-voltage transmission networks will provide policy-makers new options for policy development.

  1. Rural electrification in Chihuahua, Mexico at one third of the cost vs a conventional substation

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez, Omar; Gomez, Rolando; Solano, Arturo; Acosta, Eduardo

    2010-09-15

    This paper and presentation describes technical details about a successful experience in a unique project in Mexico for making possible the rural electrification at one third of the total cost vs a traditional substation. This alternate solution for electrification of rural communities where construction of distribution lines or traditional substations are not economically possible due to local government's budget limits or because the electrical companies are looking for the ROI Return Over Investment in poverty communities.

  2. Analysis of lightning fault detection, location and protection on short and long transmission lines using Real Time Digital Simulation

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Andre Luiz Pereira de [Siemens Ltda., Sao Paulo, SP (Brazil)], E-mail: andreluiz.oliveira@siemens.com

    2007-07-01

    The purpose of this paper is to present an analysis of lightning fault detection, location and protection using numeric distance relays applied in high voltage transmission lines, more specifically in the 500 kV transmission lines of CEMIG (Brazilian Energy Utility) between the Vespasiano 2 - Neves 1 (short line - 23.9 km) and Vespasiano 2 - Mesquita (long line - 148.6 km) substations. The analysis was based on the simulations results of numeric distance protective relays on power transmission lines, realized in September 02 to 06, 2002, at Siemens AG's facilities (Erlangen - Germany), using Real Time Digital Simulator (RTDS{sup TM}). Several lightning faults simulations were accomplished, in several conditions of the electrical power system where the protective relays would be installed. The results are presented not only with the times of lightning faults elimination, but also all the functionality of a protection system, including the correct detection, location and other advantages that these modern protection devices make possible to the power system. (author)

  3. Automated transmission system operation and management : meeting stakeholder information needs

    Energy Technology Data Exchange (ETDEWEB)

    Peelo, D.F.; Toom, P.O. [British Columbia Hydro, Vancouver, BC (Canada)

    1998-12-01

    Information monitoring is considered to be the fundamental basis for moving beyond substation automation and into automated transmission system operation and management. Information monitoring was defined as the acquisition of data and processing the data into decision making. Advances in digital technology and cheaper, more powerful computing capability has made it possible to capture all transmission stakeholder needs in a shared and automated operation and management system. Recognizing that the key to success in the development of transmission systems is automation, BC Hydro has initiated a long-term research and development project to develop the structure and detail of transmission system automation. The involvement of partners, be they utility or equipment suppliers, is essential in order to deal with protocol and similar issues. 3 refs., 1 tab., 3 figs.

  4. Advances in the diagnosis of substations primary equipment by means of high sensitivity techniques; Avances en el diagnostico de equipo primario de subestaciones mediante tecnicas de alta sensibilidad

    Energy Technology Data Exchange (ETDEWEB)

    Garcia Colon H, V. Rodolfo; Nava G, J. Armando; Azcarraga R, Carlos G [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2005-07-01

    In an electrical system, the substations primary equipment is integrated by the power transformers, the instrument transformers, the breakers and the interconnection circuits (energy cables). At the present time, the described primary equipment has been integrated in an arrangement denominated encapsulated substation that presents dimensional and aesthetic advantages in the conventional substations. Nevertheless, the isolation involved in this type of substations means new challenges when carrying out its diagnosis in a planned way or after the appearance of a fault. In this sense, the insulating and electromechanical system of the primary equipment of substations must be evaluated in a programmed way or be constantly monitored. This with the final purpose of detecting incipient problems that could evolve towards a fault or to the diminution of the electrical system reliability. [Spanish] En un sistema electrico, el equipo primario de subestaciones esta integrado por los transformadores de potencia, los transformadores de instrumento, los interruptores y los circuitos de interconexion (cables de energia). En la actualidad, el equipo primario descrito se ha integrado en un arreglo denominado subestacion encapsulada que presenta ventajas dimensionales y esteticas sobre las subestaciones convencionales. Sin embargo, el aislamiento involucrado en este tipo de subestaciones significa nuevos retos al efectuar su diagnostico de manera planeada o despues de presentarse una falla. En este sentido, el sistema aislante y electromecanico del equipo primario de subestaciones debe ser evaluado de manera programada o monitoreado constantemente. Ello con la finalidad de detectar problemas incipientes que pudieran evolucionar hacia una falla o la disminucion de la confiabilidad del sistema electrico.

  5. Griffith energy project final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information

  6. Griffith Energy Project Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  7. Griffith energy project draft environmental impact statement

    International Nuclear Information System (INIS)

    1998-10-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. The existing environmental resource conditions in the Project area and the potential impacts on the resources by the proposed action and alternatives are described. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management

  8. Analysis of retarding field energy analyzer transmission by simulation of ion trajectories

    Science.gov (United States)

    van de Ven, T. H. M.; de Meijere, C. A.; van der Horst, R. M.; van Kampen, M.; Banine, V. Y.; Beckers, J.

    2018-04-01

    Retarding field energy analyzers (RFEAs) are used routinely for the measurement of ion energy distribution functions. By contrast, their ability to measure ion flux densities has been considered unreliable because of lack of knowledge about the effective transmission of the RFEA grids. In this work, we simulate the ion trajectories through a three-gridded RFEA using the simulation software SIMION. Using idealized test cases, it is shown that at high ion energy (i.e., >100 eV) the transmission is equal to the optical transmission rather than the product of the individual grid transparencies. Below 20 eV, ion trajectories are strongly influenced by the electric fields in between the grids. In this region, grid alignment and ion focusing effects contribute to fluctuations in transmission with ion energy. Subsequently the model has been used to simulate the transmission and energy resolution of an experimental RFEA probe. Grid misalignments reduce the transmission fluctuations at low energy. The model predicts the minimum energy resolution, which has been confirmed experimentally by irradiating the probe with a beam of ions with a small energy bandwidth.

  9. Study of overvoltages by phenomenon of ferroresonance in the substation Filadelfia of the Sistema Electrico Nacional

    International Nuclear Information System (INIS)

    Montealegre Lobo, Leonardo

    2012-01-01

    The mathematical analysis of the phenomenon of ferroresonance is far from easy especially when is looked an exact solution and is wanted to take into account all relevant considerations, that the characteristic of non-linearity has presented in this phenomenon. However, a series of appropriate simplifications are conducted and is possible simulate successfully variables of interest, in this case, voltages and currents. Personnel of the Area Proteccion y Medicion, Region Chorotega of the UEN Transporte Electrico (UEN TE) has approached the Centro de Investigacion en Sistemas de Potencia to be provided by a technical support in understanding (cause and possible mitigation) of a transient event that has caused the arrester output of the Subestacion Filadelfia after conducting an energization operation in said substation. The main supply by the personnel of the UEN TE has been the current measurement of fault recorder of differential protection of power transformer, the wave forms current are recorded 100 ms before, during and 200 ms after the occurrence of the event that has blown the lightning rods low side of the substation power transformer. Research has allowed to generate the simplifications needed to reconstruct the event occurred in substation in the absence of the voltage measurements of recorded event, the magnetization curve of the transformers, the electrical characteristics of underground cables and lightning rod present in the substation. Ranges are detailed on the determination of the reasons that have caused the explosion of lightning rods in the rod 13.8 kV of substation Filadelfia when maneuvering connection of electrical equipment for energization Ingenio El Viejo. Recommendations are offered for minimizing the effects caused by these maneuvers. (author) [es

  10. Alternative surfacing materials for weed control at BC Hydro substations

    International Nuclear Information System (INIS)

    Wells, T.C.; Shrimpton, G.M.

    1997-01-01

    A two year study was conducted by BC Hydro in which a variety of surfacing materials were tested for their suitability for use in substations. Ideally, surfacing materials should have the following characteristics: high electrical resistivity in both dry and wet conditions, resistance to invasion by weeds, good driveability, good drainage, non-flammable, reasonably priced, no dust to foul conductors, and be aesthetically pleasing. Trials at Vernon Koksilah, and Ingledow substations were conducted to test the materials. A qualitative estimate of the amount of weed control provided by each material was recorded. The trials were meant to provide operational recommendations and screening information to allow for future testing of promising materials or combination of materials. Results showed that no single material meets all the desired criteria. The surfaces that best combined good weed control, electrical resistance and surface stability was a 15 cm deep layer of crushed gravel, especially if underlain by a layer of geotextile. 4 refs., 3 tabs., 1 fig

  11. Renewable Energy Zone (REZ) Transmission Planning Process

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Nathan [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-03-08

    A REZ is a geographical area that enables the development of profitable, cost-effective, grid-connected renewable energy (RE). The REZ Transmission Planning Process is a proactive approach to plan, approve, and build transmission infrastructure connecting REZs to the power system which helps to increase the share of solar, wind and other RE resources in the power system while maintaining reliability and economics, and focuses on large-scale wind and solar resources that can be developed in sufficient quantities to warrant transmission system expansion and upgrades.

  12. Efficiency of Health Care Sector at Sub-State Level in India: A Case of Punjab

    Directory of Open Access Journals (Sweden)

    Brijesh C. Purohit

    2009-11-01

    Full Text Available In recent years, WHO and other individual researchers have advocated estimation of health system performance through stochastic frontier models. It provides an idealized yardstick to evaluate economic performance of health system. So far attempts in India have remained focused at state level analysis. This paper attempts a sub-state level analysis for an affluent Indian state, namely Punjab, by using stochastic frontier technique. Our results provide pertinent insight into state health system and facilitate health facility planning at the sub-state level. Carried out in two stages of estimation, our results suggest that life expectancy in the Indian state could be enhanced considerably by correcting the factors that are adversely influencing the sub-state level health system efficiency. A higher budgetary allocation for health manpower is recommended by us to improve efficiency in poorly performing districts. This may be supported by policy initiatives outside the health system by empowering women through better education and work participation.

  13. Energy losses of superconducting power transmission cables in the grid

    DEFF Research Database (Denmark)

    Østergaard, Jacob; Okholm, Jan; Lomholt, Karin

    2001-01-01

    One of the obvious motives for development of superconducting power transmission cables is reduction of transmission losses. Loss components in superconducting cables as well as in conventional cables have been examined. These losses are used for calculating the total energy losses of conventional...... as well as superconducting cables when they are placed in the electric power transmission network. It is concluded that high load connections are necessary to obtain energy saving by the use of HTSC cables. For selected high load connections, an energy saving of 40% is expected. It is shown...

  14. On the use of programmable logical controllers (PLC) in the emergency control schemes for the 750 kV system

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Roberto Campos de; Oliveira, Mario Cesar Santos de [FURNAS, Rio de Janeiro, RJ (Brazil)

    1994-12-31

    The energy produced at the Itaipu Power Plant for the Brazilian Interconnected System is transmitted through two different transmission system: -HVDC system, with two bipoles of +- 600 kV, 6300 MW which connect the substation of Foz do Iguacu in the State of Parana, to substation of Ibiuna in the State of Sao Paulo, transmitting the energy generated in 50 Hz units. This system was entirely commissioned on september of 1987. (author) 3 refs., 5 figs.

  15. Assessment of occupational exposure to magnetic fields in high-voltage substations (154/34.5 kV)

    International Nuclear Information System (INIS)

    Helhel, S.; Ozen, S.

    2008-01-01

    This work proposes the survey of magnetic field measurements taken in 154/31.5 kV substations in the city of Antalya for occupational exposure assessment. For measurements, three substations have been taken into account, where four occupants are present for each 8 h of shift, which means 12 occupants are present during the day. Operator desks at three different substations read a lowest magnetic field of 0.3 μT at minimum loaded season and reached up to 1 μT at maximum loaded season, which means operators exposed to a magnetic field of ≥ 0.3 μT 8 h d -1 . In switch gear regions, maximum magnetic field reading is 23 μT at minimum loaded season and reached up to 70 μT. Outdoor magnetic field measurement at circuit breaker region goes up to 62 μT with respect to operator heights. (authors)

  16. Ground potential rise on the high voltage substation during lightning strike measurement and simulation results

    Energy Technology Data Exchange (ETDEWEB)

    Wiater, Jaroslaw [Bialystok Technical University (Poland). Electrical Dept.], E-mail: jaroslawwiater@we.pb.edu.pl

    2007-07-01

    This paper will present a ground potential rise (GPR) measurement results. All measurements were made during normal work of the real high voltage substation and according a special procedure developed for this occasion. This procedure does not influence on the protection relays and ensures a proper work of the substation even for 6 kV surges. During measurements current and voltage surges were produced by the impulse generator - UCS 500M6B. Measurement results are compared to simulation results performed in CDEGS software for the same initial conditions. (author)

  17. Wave energy transmission apparatus for high-temperature environments

    Science.gov (United States)

    Buckley, John D. (Inventor); Edwards, William C. (Inventor); Kelliher, Warren C. (Inventor); Carlberg, Ingrid A. (Inventor)

    2010-01-01

    A wave energy transmission apparatus has a conduit made from a refractory oxide. A transparent, refractory ceramic window is coupled to the conduit. Wave energy passing through the window enters the conduit.

  18. [Review of wireless energy transmission system for total artificial heart].

    Science.gov (United States)

    Zhang, Chi; Yang, Ming

    2009-11-01

    This paper sums up the fundamental structure of wireless energy transmission system for total artificial heart, and compares the key parameters and performance of some representative systems. After that, it is discussed that the future development trend of wireless energy transmission system for total artificial heart.

  19. Electric Substations, Electric substation locations provided to us from Kansas City Power and Light and City of Gardner only at this time. AIMS is working on getting other providers in area. Data is limited to CUE (Collaborative Utility Exchange) Participants and subcontracto, Published in 2004, Johnson County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Electric Substations dataset current as of 2004. Electric substation locations provided to us from Kansas City Power and Light and City of Gardner only at this time....

  20. Future power plant control integrates process and substation automation into one system; Zukunftsorientierte Kraftwerksleittechnik vereint Prozess- und Stationsautomatisierung

    Energy Technology Data Exchange (ETDEWEB)

    Orth, J. [ABB AG, Mannheim (Germany). Div. Energietechnik-Systeme

    2007-07-01

    The new IEC 61850 standard has been established for substation control systems. In future, IEC 61850 may also be widely used for electrical systems in power plants. IEC 61850 simplifies the integration of process and substation control systems in power plants by creating one automated system across manufacturers and thus makes a significant contribution to cost efficiency in operation and maintenance. (orig.)

  1. Energy and bandwidth-efficient wireless transmission

    CERN Document Server

    Gao, Wei

    2017-01-01

    This book introduces key modulation and predistortion techniques for approaching energy and spectrum-efficient transmission for wireless communication systems. The book presents a combination of theoretical principles, practical implementations, and actual tests. It focuses on spectrum-efficient modulation and energy-efficient transmission techniques in the portable wireless communication systems, and introduces currently developed and designed RF transceivers in the latest wireless markets. Most materials, design examples, and design strategies used are based on the author’s two decades of work in the digital communication fields, especially in the areas of the digital modulations, demodulations, digital signal processing, and linearization of power amplifiers. The applications of these practical products and equipment cover the satellite communications on earth station systems, microwave communication systems, 2G GSM and 3G WCDMA mobile communication systems, and 802.11 WLAN systems.

  2. Energy Transmission and Infrastructure

    Energy Technology Data Exchange (ETDEWEB)

    Mathison, Jane

    2012-12-31

    The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers

  3. 75 FR 75170 - Minnkota Power Cooperative, Inc.: Bemidji to Grand Rapids 230 kV Transmission Line Project

    Science.gov (United States)

    2010-12-02

    ... availability of Record of Decision. SUMMARY: The Rural Utilities Service, hereinafter referred to as RUS and/or the Agency, has issued a Record of Decision (ROD) for the Environmental Impact Statement (EIS) for the... financing to construct the 230 kilovolt (kV) transmission line between the Wilton Substation near Bemidji...

  4. Application of electro geometric model for analysis of overhead power lines and substation in lightning incidence, v. 16(62)

    International Nuclear Information System (INIS)

    Kotevski, Darko

    2008-01-01

    This paper is a resume of the master thesis made within my master studies at the Department for transmission and distribution systems at FEIT-Skopje. New methodology is presented for estimation of the rates of lightning strikes on power lines and substations with Monte Carlo simulation. Modeling is based on well known electro geometric model which states that protection zones of lightning protection devices are dependant with amplitude of the lighting current. Therefore, for a known configuration it is possible with application of simple numerical methods to evaluate efficiency of the protection devices. Data gained from the simulations can be used to design such devices, to correct existing lightning protection systems or to make analysis for improving reliability of power system elements in lightning incidence. (Author)

  5. Application of electro geometric model for analysis of overhead power lines and substation in lightning incidence, v. 16(63)

    International Nuclear Information System (INIS)

    Kotevski, Darko

    2008-01-01

    This paper is a resume of the master thesis made within my master studies at the Department for transmission and distribution systems at FEIT-Skopje. New methodology is presented for estimation of the rates of lightning strikes on power lines and substations with Monte Carlo simulation. Modeling is based on well known electro geometric model which states that protection zones of lightning protection devices are dependant with amplitude of the lighting current. Therefore, for a known configuration it is possible with application of simple numerical methods to evaluate efficiency of the protection devices. Data gained from the simulations can be used to design such devices, to correct existing lightning protection systems or to make analysis for improving reliability of power system elements in lightning incidence. (Author

  6. Seismic risk evaluation for high voltage air insulated substations

    International Nuclear Information System (INIS)

    Camensig, Carlo; Bresesti, Luca; Clementel, Stefano; Salvetti, Maurizio

    1997-01-01

    This paper describes the results of the analytical and experimental activities performed by ISMES for the evaluation of the structural reliability of electrical substations with respect to seismic events. In the following, the reference station is described along with the methods used to define the site seismic input, the analytical and experimental evaluation of the components' fragility curves and the whole station seismic risk evaluation

  7. Laser Energy Transmission for a Wireless Energy Supply to Robots

    OpenAIRE

    Kawashima, Nobuki; Takeda, Kazuya

    2008-01-01

    We can find a lot of robot applications in construction activities, where it is very difficult or dangerous for a man to access and only robots can work. The time will come soon when the actual use of those robots is extensively realized and the wireless energy transmission technology using laser is a unique means to supply energy to those robots.

  8. Cost Forecasting of Substation Projects Based on Cuckoo Search Algorithm and Support Vector Machines

    Directory of Open Access Journals (Sweden)

    Dongxiao Niu

    2018-01-01

    Full Text Available Accurate prediction of substation project cost is helpful to improve the investment management and sustainability. It is also directly related to the economy of substation project. Ensemble Empirical Mode Decomposition (EEMD can decompose variables with non-stationary sequence signals into significant regularity and periodicity, which is helpful in improving the accuracy of prediction model. Adding the Gauss perturbation to the traditional Cuckoo Search (CS algorithm can improve the searching vigor and precision of CS algorithm. Thus, the parameters and kernel functions of Support Vector Machines (SVM model are optimized. By comparing the prediction results with other models, this model has higher prediction accuracy.

  9. METHODOLOGY OF DETERMINATION OF QUALITY INDEX OF MAINTENANCE SERVICE SYSTEM OF POWER EQUIPMENT OF TRACTION SUBSTATIONS

    Directory of Open Access Journals (Sweden)

    O.O. Matusevych

    2016-03-01

    Full Text Available Purpose. The purpose of this paper is development of methodology for definition of a quality system of maintenance and repair (M and P power equipment of traction substations (TS of electrified railways operating under conditions of uncertainty based on expert information. Methodology. The basic tenets of the theory of fuzzy sets and marks, linguistic and interval estimates of experts were applied to solve this problem. Results. Analysis of the existing diversity of approaches to development of modern methods of improvement of M and P allows us to conclude that the improvement in the quality of the system is achieved by solving individual problems increase the operational reliability of power equipment of traction substations in the following main interrelated areas. There are technical, economic and organizational. The basis of the quality evaluation system is initial data and expertise developed version of the document formalized quality evaluation of electrical equipment of traction substations by experts. The choice of determining the level of Quality service system based on the marks, linguistic and interval estimates of experts, which are reflected in quantitative and / or qualitative form was done. The possible options for expert data presentation and their corresponding quantitative methods of calculating the integral index of quality improvement system maintenance and P of traction substations were described. The methodology and the method of assessing the quality of system maintenance and P of TS allows quickly respond to changing operating conditions of power equipment of traction substations, and to determine the most effective strategies for maintenance of electrical and P TS under conditions of uncertainty functioning distance electricity. Originality. The method of a systematic approach to improve the quality of the system maintenance and P of power equipment of traction substation under conditions of uncertainty based on expert

  10. Workers' exposure to electric fields during the task 'maintenance of an operating device of circuit breaker from a service platform' at 110-kV substations.

    Science.gov (United States)

    Korpinen, Leena; Pääkkönen, Rauno

    2018-02-26

    The objective of the study was to investigate occupational exposure to electric fields during the task 'maintenance of an operating device of circuit breaker from a service platform' at 110-kV substations. The aim was also to compare the results to Directive 2013/35/EU. At 16 substations, 255 electric field measurements were performed. The highest mean value of the electric fields was 9.6 kV⋅m -1 . At 63% of substations the maximum values were over 10.0 kV⋅m -1 , and at 31% of the substations the 75th percentiles were over 10.0 kV⋅m -1 , which is the low action level (AL) according to Directive 2013/35/EU. All measured values were below the high AL (20.0 kV⋅m -1 ). In the future, it is important to take into account that the measurements were only taken at Finnish 110-kV substations; therefore, it is not possible to generalize these results to other countries and different types of substations.

  11. Multi-region optimal deployment of renewable energy considering different interregional transmission scenarios

    International Nuclear Information System (INIS)

    Wang, Ge; Zhang, Qi; Mclellan, Benjamin C.; Li, Hailong

    2016-01-01

    Renewable energy is expected to play much more important role in future low-carbon energy system, however, renewable energy has problems with regard to load-following and regional imbalance. This study aims to plan the deployment of intermittent renewable energy in multiple regions considering the impacts of regional natural conditions and generation capacity mix as well as interregional transmission capacity using a multi-region dynamic optimization model. The model was developed to find optimized development paths toward future smart electricity systems with high level penetration of intermittent renewable energy considering regional differences and interregional transmission at national scale. As a case study, the model was applied to plan power generation in nine interconnected regions in Japan out to 2030. Four scenarios were proposed with different supporting policies for the interregional power transmission infrastructures and different nuclear power phase-out scenarios. The analysis results show that (i) the government's support for power transmission infrastructures is vital important to develop more intermittent renewable energy in appropriate regions and utilize renewable energy more efficiently; (ii) nuclear and renewable can complement rather than replace each other if enough interregional transmission capacity is provided. - Highlights: • Plan the optimal deployment of intermittent renewable energy in multiple regions. • A multi-region dynamic optimization model was developed. • The impacts of natural conditions and interregional transmission are studied. • The government's support for transmission is vital important for renewable energy. • Nuclear and renewable can complement rather than replace each other.

  12. New transmission interconnection reduces consumer costs

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2008-09-15

    The Central American electric interconnection system (SIEPAC) project will involve the construction of a 1830 km 230 kV transmission system that will link Guatemala, El Salvador, Honduras, Costa Rica, Nicaragua, and Panama. The system is expected to alleviate the region's power shortages and reduce electricity costs for consumers. Costs for the SIEPAC project have been estimated at $370 million. The system will serve approximately 37 million customers, and will include 15 substations. The contract for building the electrical equipment has been awarded to Schweitzer Engineering Laboratories (SEL) who plan to manufacture components at a plant in Mexico. The equipment will include high speed line protection, automation, and control systems. Line current differential systems and satellite-synchronized clocks will also be used. The new transmission system is expected to be fully operational by 2009. 1 fig.

  13. ELECTRODYNAMICS OF TRANSMISSION AND LOSSES OF POWER IN THE DEVICES OF ELECTRIC TRACTION SYSTEMS

    Directory of Open Access Journals (Sweden)

    M. O. Kostin

    2014-01-01

    Full Text Available Purpose. Theoretical justification of the "field" approach (based on electromagnetic field to the transmission and losses of power in the devices of traction power supply systems and electric rolling stock. Methodology. The methods of electromagnetic field theory and, in particular, the theory and practice of electromagnetic energy transmission based on the concept of the Poynting vector and elements of the theory of propagation, reflection and refraction of plane electromagnetic waves were used. Findings. Theoretical studies of electromagnetic energy transmission from the traction substation to the electric rolling stock through dielectric (air surrounding traction network: between the contact wire and the rail were carried out. It is proposed strategic designing "squat" (low types of electric rolling stock. The components of electric energy flow through the roof of electric rolling stock and its frontal part of the body were estimated. This allows reliable etimating active power losses in electric traction system. To compensate the reactive power consumed by electric rolling stock, which is conditioned by standing waves, it is proposed (for extinction of the the last to develop and put in front of electric rolling stock the layer of particular environment with the necessary parameters. Originality. The "field" principle of the power transmission analysis and its losses arising in electric traction system was first proposed. The laws of motion of electromagnetic energy flows through the roof and the frontal part of the body of electric rolling stock were established. Practical value. An expression of the absolute value of the Poynting vector in the points of dielectric (air between the contact wire and the rail was obtained. This allows assessing the highest density of energy, which is transferred to the time unit and predicting the main dimensions of the unit of electric rolling stock. The energy indices of the roof of electric rolling stock

  14. Energy-efficient and cost-effective in-house substations bypass for improving thermal and DHW (domestic hot water) comfort in bathrooms in low-energy buildings supplied by low-temperature district heating

    DEFF Research Database (Denmark)

    Brand, Marek; Dalla Rosa, Alessandro; Svendsen, Svend

    2014-01-01

    temperature and additional cooling of bypass water by 3.9 °C, reducing the heat loss from the DH network by 13% and covering 40% of the heat used in the bathroom FH. The use of the bypass flow in bathroom FH is a cost-effective solution exploiting the heat that would otherwise be lost in the DH network......Using a bypass to redirect a small flow through the in-house DH (district heating) substation directly to the return pipe is a commonly used but energy-inefficient solution to keep the DH network “warm” during non-heating seasons. Instead, this water can be redirected to the bathroom FH (floor...... heating) to cool down further and thus reduce the heat lost from bypass operation while tempering the bathroom floor and guaranteeing fast provision of DHW (domestic hot water). We used the commercial software IDA-ICE to model a reference building where we implemented various solutions for controlling...

  15. Transmission policy in Alberta and Bill 50

    International Nuclear Information System (INIS)

    Church, J.; Rosehart, W.; MacCormack, J.

    2009-01-01

    Plans developed by the Alberta Electric System Operator (AESO) have determined that Alberta's electrical transmission system needs to be expanded. However, there are complex issues that must be considered in order to assess the nature and extent of the needed expansion. Various new amendments to the system were proposed in the Alberta government's Bill 50, including the construction of new transmission lines; the installation of a double circuit 500 kV alternating current line between Edmonton and the Gibbons-Redwater region; the construction of a new 240 kV substation in southeast Calgary; and the installation of 2 single circuit 500 kV alternating current lines between Edmonton and Fort McMurray. This study provided a review of the institutional framework instituted by the government's transmission policy and compared the costs and benefits of 2 large capacity high voltage DC (HVDC) transmission lines proposed for the Edmonton-Calgary corridor relative to the various other transmission system amendment suggestions. An evaluation of Alberta's proposed regulatory process under Bill 50 was also conducted. Results of the study indicated that the addition of the HVDC lines is an inefficient response to concerns over adequate supply and reliability. 72 refs., 18 tabs.

  16. Development of Protection and Control Unit for Distribution Substation

    Science.gov (United States)

    Iguchi, Fumiaki; Hayashi, Hideyuki; Takeuchi, Motohiro; Kido, Mitsuyasu; Kobayashi, Takashi; Yanaoka, Atsushi

    The Recently, electronics and IT technologies have been rapidly innovated and have been introduced to power system protection & control system to achieve high reliability, maintainability and more functionality. Concerning the distribution substation application, digital relays have been applied for more than 10 years. Because of a number of electronic devices used for it, product cost becomes higher. Also, products installed during the past high-growth period will be at the end of lifetime and will be replaced. Therefore, replacing market is expected to grow and the reduction of cost is demanded. Considering above mentioned background, second generation digital protection and control unit as a successor is designed to have following concepts. Functional integration based on advanced digital technologies, Ethernet LAN based indoor communication network, cost reduction and downsizing. Pondering above concepts, integration of protection and control function is adopted in contrary to the functional segregation applied to the previous system in order to achieve one-unit concept. Also the adoption of Ethernet LAN for inter-unit communication is objective. This report shows the development of second-generation digital relay for distribution substation, which is equipped with control function and Ethernet LAN by reducing the size of auxiliary transformer unit and the same size as previous product is realized.

  17. On issue of reconstruction at central distribution substation by example of one of plants of Chelyabinsk region

    Science.gov (United States)

    Brylina, O. G.; Semenova, K. D.; Shashkin, V. YU

    2018-03-01

    The article considers the issues of increasing the reliability and economy of the distribution substation. The result is found due to the reconstruction of the central distribution substation and one of the plants of Chelyabinsk region. The reasons for the reconstruction are explained. A comparison of oil and vacuum circuit breakers is made. The advantages of vacuum circuit breakers are shown. Alternative replacement of cables is offered. The basic technical characteristics of the cable brands are shown. The results of reconstruction are proved.

  18. Rocket experiment METS - Microwave Energy Transmission in Space

    Science.gov (United States)

    Kaya, N.; Matsumoto, H.; Akiba, R.

    A Microwave Energy Transmission in Space (METS) rocket experiment is being planned by the Solar Power Satellite Working Group at the Institute of Space and Astronautical Science in Japan for the forthcoming International Space Year, 1992. The METS experiment is an advanced version of the previous MINIX rocket experiment (Matsumoto et al., 1990). This paper describes a conceptual design of the METS rocket experiment. It aims at verifying a newly developed microwave energy transmission system for space use and to study nonlinear effects of the microwave energy beam in the space plasma environment. A high power microwave of 936 W will be transmitted by the new phased-array antenna from a mother rocket to a separated target (daughter rocket) through the ionospheric plasma. The active phased-array system has a capability of focusing the microwave energy around any spatial point by controlling the digital phase shifters individually.

  19. Rocket experiment METS Microwave Energy Transmission in Space

    Science.gov (United States)

    Kaya, N.; Matsumoto, H.; Akiba, R.

    A METS (Microwave Energy Transmission in Space) rocket experiment is being planned by the SPS (Solar Power Satellite) Working Group at the Institute of Space and Astronautical Science (ISAS) in Japan for the forthcoming International Space Year (ISY), 1992. The METS experiment is an advanced version of our MINIX rocket experiment. This paper describes the conceptual design for the METS rocket experiment. Aims are to verify the feasibility of a newly developed microwave energy transmission system designed for use in space and to study nonlinear effects of the microwave energy beam on space plasma. A high power microwave (936 W) will be transmitted by a new phase-array antenna from a mother rocket to a separate target (daughter rocket) through the Earth's ionospheric plasma. The active phased-array system has the capability of being able to focus the microwave energy at any spatial point by individually controlling the digital phase shifters.

  20. Optimum transmission system expansion offshore considering renewable energy sources

    NARCIS (Netherlands)

    Torbaghan, Shahab S.; Gibescu, Madeleine

    2017-01-01

    This chapter provides an overview of transmission expansion planning (TEP) methods and their practical application. First, it discusses the strategic importance of the transmission system. Next, it describes the reasons why TEP remains a challenge for systems with a large share of renewable energy.

  1. Population Stabilization in India: A Sub-State level Analysis

    OpenAIRE

    Purohit C, Dr Brijesh

    2007-01-01

    The study aims at analyzing economic and policy factors impinging upon population stabilization measures at the district (sub-state level) in India. It reflects upon popularly debated notions, namely, that development is the best contraceptive or whether contraceptive is the best development. In order to reflect upon this notion, we hypothesize that the factors determining the success of population stabilization measures are likely to be different across rich and poor states. It is more likel...

  2. The thermal relay design to improve power system security for the HTS cables in Icheon substation

    International Nuclear Information System (INIS)

    Lee, Hansang; Yang, Byeong-Mo; Jang, Gilsoo

    2013-01-01

    Highlights: •It is important to study thermal characteristics of the HTS cable. •The thermal relay in the Icheon substation has been developed. •Well-designed thermal relay has been verified through PSCAD/EMTDC simulations. -- Abstract: This paper proposes a model for thermal protection relay for the high temperature superconducting (HTS) cables and thermal protection scheme in Icheon substation in Korea. The thermal protection is one of the most important factors to guarantee the reliability of the HTS cable as well as power system security. The superconductivity of the HTS cables, which can be guaranteed by the liquid nitrogen near 70 K, can be threatened by the large fault current. To avoid the overheating in HTS cable and to secure the power system operation with the HTS cable, the thermal protection relay should be considered. To find the optimal thermal-protection scheme, the model for the superconducting power system has been achieved in Icheon substation and the thermal protection scheme has been verified through PSCAD/EMTDC simulation

  3. The thermal relay design to improve power system security for the HTS cables in Icheon substation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hansang, E-mail: hslee80@kiu.ac.kr [School of Railway and Electrical Engineering, Kyungil University, Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do 712-701 (Korea, Republic of); Yang, Byeong-Mo [Korea Electric Power Research Institute, Munji-dong, Yuseong-gu, Daejeon 305-760 (Korea, Republic of); Jang, Gilsoo, E-mail: gjang@korea.ac.kr [School of Electrical Engineering, Korea University, Anam-dong 5-ga, Seongbuk-gu, Seoul 136-713 (Korea, Republic of)

    2013-11-15

    Highlights: •It is important to study thermal characteristics of the HTS cable. •The thermal relay in the Icheon substation has been developed. •Well-designed thermal relay has been verified through PSCAD/EMTDC simulations. -- Abstract: This paper proposes a model for thermal protection relay for the high temperature superconducting (HTS) cables and thermal protection scheme in Icheon substation in Korea. The thermal protection is one of the most important factors to guarantee the reliability of the HTS cable as well as power system security. The superconductivity of the HTS cables, which can be guaranteed by the liquid nitrogen near 70 K, can be threatened by the large fault current. To avoid the overheating in HTS cable and to secure the power system operation with the HTS cable, the thermal protection relay should be considered. To find the optimal thermal-protection scheme, the model for the superconducting power system has been achieved in Icheon substation and the thermal protection scheme has been verified through PSCAD/EMTDC simulation.

  4. Wild Horse 69-kV transmission line environmental assessment

    International Nuclear Information System (INIS)

    1996-12-01

    Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline's pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE's review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest

  5. Wild Horse 69-kV transmission line environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline`s pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE`s review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest.

  6. Method for analysis of averages over transmission energy of resonance neutrons

    International Nuclear Information System (INIS)

    Komarov, A.V.; Luk'yanov, A.A.

    1981-01-01

    Experimental data on transmissions on iron specimens in different energy groups have been analyzed on the basis of an earlier developed theoretical model for the description of resonance neutron averages in transmission energy, as the functions of specimen thickness and mean resonance parameters. The parameter values obtained agree with the corresponding data evaluated in the theory of mean neutron cross sections. The method suggested for the transmission description permits to reproduce experimental results for any thicknesses of specimens [ru

  7. Rugi Daya Dan Energi Akibat Korona Pada Saluran Udara Tegangan Ekstra Tinggi (SUTET 500 Kv

    Directory of Open Access Journals (Sweden)

    Muhamad Haddin

    2018-01-01

    Full Text Available The use of extra high voltage in electrical power transmission system causing corona. A visual corona phenomenon shown by the appearance of visible light radiation, hissing noise, ozone formation and power losses. The impact of corona affect the environment surrounding the overhead line transmission and power losses in the line. This research discusses power and energy losses due to corona by using quantitative method. Calculations performed by calculating relative air density values, disruptive critical voltages, power losses and corona energy. The research object was taken by extra high voltage  overhead line transmission 500kV Tanjung Jati B Power Plant to Ungaran Substation.The result show that corona power losses are 0.41-0.44 kW/mil (0.25-0.27kw/km per phase, with total 1.25-1.30kW/mil (0.78-0.81k/w/km. corona power losses 107.57-112.08 kW along of line. Average of corona energy losses obtained 2642.67 kWh. The percentage of corona power losses to electrical power supplied is between 0.005% to 0.011%.

  8. Major Refit for CERN's 400 kV Substation (Part of the new control and protection system for the 18 kV side)

    CERN Document Server

    2001-01-01

    The 400 kV substation on the Prévessin site brings in the electricity that powers CERN's accelerators and the majority of the Laboratory's installations. It was originally built in the 1970s for the SPS, and is one of only five privately owned 400 kV sub-stations in France. Three of the others belong to the national railway company, SNCF, supplying the Paris-Marseilles TGV line, the other is at the Cadarache research centre near mouth of the Rhone. After nearly thirty years of service, CERN's substation has just undergone a complete overhaul.

  9. IEEE 693 seismic qualification of composites for substation high-voltage equipment

    Energy Technology Data Exchange (ETDEWEB)

    Schiff, A.J. [Precision Measurement Instruments, Los Altos Hills, CA (United States); Kempner, L.Jr. [Bonneville Power Administration, Vancouver, BC (Canada)

    2004-07-01

    Standard 693-1997 of the Institute of Electrical and Electronic Engineers (IEEE) is the recommended practice for seismic design of substations. It represents a significant improvement in the way the power industry seismically qualifies substation high-voltage equipment. This paper described the use of IEEE Standard 693 for hollow-core composite insulators that are used on high-voltage transformers and demonstrated that changes are warranted. The following four failure modes associated with the composite insulator were discussed: bond degradation, bond failure, tube degradation and tube layer delamination. The authors evaluated the IEEE 693 qualification procedure of time history shake-table and static-pull tests and were concerned about acceptance criteria. It was shown that acceptance criteria are not valid for qualifying hollow-core composites and that static-pull tests are needed after the vibration qualification tests are completed. It was suggested that more research is warranted to determine if bonding at the top part of the flange can be eliminated, thereby eliminating bond degradation. The resulting increase in system damping would improve the dynamic response of the unit. 1 ref., 10 figs.

  10. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-60) - Rocky Reach - Maple Valley No. 1

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Mark A. [Bonneville Power Administration (BPA), Portland, OR (United States)

    2002-04-15

    Vegetation Management along the Rocky Reach – Maple Valley No. 1 Transmission Line ROW from structure 110/1 to the Maple Valley Substation. The transmission line is a 500 kV line. BPA proposes to clear targeted vegetation along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation management along existing access road and around structure landings for the purpose of maintaining access to structures site. All work will be in accordance with the National Electrical Safety Code and BPA standards.

  11. Sickness absence from 1978 to 1992 of Electricite de France (EDF) workers exposed to ELF-EMF: the substation group

    International Nuclear Information System (INIS)

    Souques, M.; Dab, W.; Lambrozo, J.; Chevalier, A.; Coing, F.

    1996-01-01

    Electromagnetic fields are suspected of many health effects, including cancers, immunity and fertility disorders, congenital malformations, suicides and depression.... Although the results of all studies are contradictory and no biological mechanism has been found, populations are concerned about this matter. This study analyzes the absence from work of some EDF employees who are a priori the most professionally exposed to ELF EMF. Absence from work is taken as an health indicator. Although it is not specific, it can be predictive of serious health problems. The specific context of EDF has made it possible to collect and analyze the medical aspect of absence from work, that is rare in France. We were interested with employees working with high voltage (over 90 kV). Three job categories have been selected: live line workers, substation maintenance workers and substation exploitation workers (called in the company the ATEX). The first group concerned the live linemen and the results were exposed previously. It appeared they had more accidents at work, but this was more related to the job of lineman rather than to the EMF exposure. Nevertheless, substation workers have an exposure less intensive but longer than live linemen. We present here the result about the absenteeism of the substation workers, maintenance and exploitation. (author)

  12. Cross-layer Energy Optimization Under Image Quality Constraints for Wireless Image Transmissions.

    Science.gov (United States)

    Yang, Na; Demirkol, Ilker; Heinzelman, Wendi

    2012-01-01

    Wireless image transmission is critical in many applications, such as surveillance and environment monitoring. In order to make the best use of the limited energy of the battery-operated cameras, while satisfying the application-level image quality constraints, cross-layer design is critical. In this paper, we develop an image transmission model that allows the application layer (e.g., the user) to specify an image quality constraint, and optimizes the lower layer parameters of transmit power and packet length, to minimize the energy dissipation in image transmission over a given distance. The effectiveness of this approach is evaluated by applying the proposed energy optimization to a reference ZigBee system and a WiFi system, and also by comparing to an energy optimization study that does not consider any image quality constraint. Evaluations show that our scheme outperforms the default settings of the investigated commercial devices and saves a significant amount of energy at middle-to-large transmission distances.

  13. The San Bernabe power substation; La subestacion San Bernabe

    Energy Technology Data Exchange (ETDEWEB)

    Chavez Sanudo, Andres D. [Luz y Fuerza del Centro, Mexico, D. F. (Mexico)

    1997-12-31

    The first planning studies that gave rise to the San Bernabe substation go back to year 1985. The main circumstance that supports this decision is the gradual restriction for electric power generation that has been suffering the Miguel Aleman Hydro System, until its complete disappearance, to give priority to the potable water supply through the Cutzamala pumping system, that feeds in an important way Mexico City and the State of Mexico. In this document the author describes the construction project of the San Bernabe Substation; mention is made of the technological experiences obtained during the construction and its geographical location is shown, as well as the one line diagram of the same [Espanol] Los primeros estudios de planeacion que dieron origen a la subestacion San Bernabe se remontan al ano de 1985. La circunstancia principal que soporta esta decision es la restriccion paulatina para generar energia que ha venido experimentando el Sistema Hidroelectrico Miguel Aleman, hasta su desaparicion total, para dar prioridad al suministro de agua potable por medio del sistema de bombeo Cutzamala, que alimenta en forma importante a la Ciudad de Mexico y al Estado de Mexico. En este documento el autor describe el proyecto de construccion de la subestacion San Bernabe; se mencionan las experiencias tecnologicas obtenidas durante su construccion y se ilustra su ubicacion geografica, asi como un diagrama unifilar de la misma

  14. Tehachapi Wind Energy Storage Project - Technology Performance Report #3

    Energy Technology Data Exchange (ETDEWEB)

    Pinsky, Naum [Southern California Edison, Rosemead, CA (United States); O' Neill, Lori [Southern California Edison, Rosemead, CA (United States)

    2017-03-31

    The TSP is located at SCE’s Monolith Substation in Tehachapi, California. The 8 MW, 4 hours (32 MWh) BESS is housed in a 6,300 square foot facility and 2 x 4 MW/4.5 MVA smart inverters are on a concrete pad adjacent to the BESS facility. The project will evaluate the capabilities of the BESS to improve grid performance and assist in the integration of large-scale intermittent generation, e.g., wind. Project performance was measured by 13 specific operational uses: providing voltage support and grid stabilization, decreasing transmission losses, diminishing congestion, increasing system reliability, deferring transmission investment, optimizing renewable-related transmission, providing system capacity and resources adequacy, integrating renewable energy (smoothing), shifting wind generation output, frequency regulation, spin/non-spin replacement reserves, ramp management, and energy price arbitrage. Most of the operations either shift other generation resources to meet peak load and other electricity system needs with stored electricity, or resolve grid stability and capacity concerns that result from the interconnection of intermittent generation. SCE also demonstrated the ability of lithium ion battery storage to provide nearly instantaneous maximum capacity for supply-side ramp rate control to minimize the need for fossil fuel-powered back-up generation. The project began in October, 2010 and will continue through December, 2016.

  15. Decision and Order in the matter of an application by Superior Wind Prince Power Inc. for an Order or Orders pursuant to section 92 of the Ontario Energy Board Act, 1998 granting leave to construct a 230 kV transmission line and associated facilities to connect a proposed 99 MW wind farm to the transmission system of Great Lakes Power Ltd. near Sault Ste Marie[In the matter of the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, Schedule B

    Energy Technology Data Exchange (ETDEWEB)

    Kaiser, G.; Betts, B.; Vlahos, P.

    2005-07-28

    Superior Wind Prince Power Inc. plans to construct and operate a 99 MW wind generation facility near Sault Ste. Marie, Ontario. It has also filed an application with the Ontario Energy Board to construct transmission facilities to connect the wind farm to the transmission system of Great Lakes Power Ltd. This includes a substation with a 34.5/230 kV transformer, a high voltage breaker, and low voltage switchgear. It also includes an 11.2 km long, 230 kV transmission line and a switching station with a 230 kV breaker and related facilities. The entire project is scheduled for completion by March, 2006. The Board will proceed with the application by way of a written hearing. This document presents evidence of the applicant with reference to the request for proposals for 300 MW of Renewable Energy. The wind farm includes 66 wind turbine generators providing an output of 99 MW. Plans for a second phase would add 101 MW to the wind farm. Different high voltage and low voltage configurations have been examined on the basis of environmental and economic considerations and system reliability. The best configuration was a 34.5 kV underground collector system and a 230 kV above ground transmission line. Four alternative routes for the line were examined on the basis of environmental, technical and economic factors. This document also provided evidence of PUC Distribution Inc. and addressed issues regarding a system impact assessment, customer impact assessment, and environmental assessment. The Board questioned whether the project is needed, what impact it will have on transmission rates, and reliability of supply. It also examined if all land-use matters have been addressed. The Board approved the project subject to certain conditions regarding communications, monitoring and reporting requirements. 2 refs., 1 appendix.

  16. A Digital Power Quality Monitoring Equipment Designed for Digital Substation

    Science.gov (United States)

    Li, Wei; Wang, Xin; Geng, Jiewen

    2018-01-01

    Taking into account both current status and development trend of digital substation, this paper proposed a design of a new multi-channelled digital power quality monitoring equipment with high compatibility. The overall functional structure, hardware architecture, software architecture, interface architecture and some key techniques such as IEC 61850 modelling of transient event and harmonic measurement method under the condition of non-synchronous sampling are described in this paper.

  17. Low-energy electron transmission through high aspect ratio Al O nanocapillaries

    DEFF Research Database (Denmark)

    Milosavljević, A.R.; Jureta, J.; Víkor, G.

    2009-01-01

    Electron transmission through insulating AlO nanocapillaries of different diameters (40 and 270 nm) and 15 μm length has been investigated for low-energy electrons (2-120 V). The total intensity of transmitted current weakly depends on the incident electron energy and tilt angle defined with resp......Electron transmission through insulating AlO nanocapillaries of different diameters (40 and 270 nm) and 15 μm length has been investigated for low-energy electrons (2-120 V). The total intensity of transmitted current weakly depends on the incident electron energy and tilt angle defined...

  18. Overview of electrical energy in march 2003

    International Nuclear Information System (INIS)

    2003-01-01

    This document aims to give information on the exploitation of the transmission public network and the french electric power industry during march 2003: the internal electric power consumption in France (national consumption is the total of all the electrical energy supplied for consumption in France (including Corsica, but not the French Overseas Departments), thermal and hydro generation + imports - exports - pumping, and which have been consumed in the transmission and distribution networks, by the end-users, as well as by losses) - national consumption in March 2003 shows a rise of 1.1% compared with that of March 2002, despite an average temperature higher by 0.5 deg. C in March 2003 compared with the same month of the prior year, but with 3 fewer 'Peak Day Withdrawal' (EJP) tariff option requests than in March 2002. The adjusted consumption growth rate over 12 months has risen by 0.2% since last month, while the national consumption growth rate has increased slightly, rising from 1.3% at the end of February 2003, to +1.5% at the end of March 2003; the energy accounting from the transmission point of view (the balance recorded by RTE takes into account only the energy physical flows conveyed on the RTE network) - to cope with increased national consumption as compared with March 2002, the overall volume of injections is up by 0.9 TWh, for a total figure of 45.2 TWh in March 2003. Hydro output is on the rise by 0.6 TWh compared with the same period of the prior year and thermal generation remains relatively stable, up by 0.1 TWh. Both imports and exports have increased by about 0.2 TWh, the export balance remaining identical to that of March 2002; the consumption and the physical exchanges (these values reflect all of the flows on the RTE network, as well as the generation auto-consumed by the industrial consumers connected to this network); the electric power market: the market players, contractual exchanges recorded by RTE, contractual exchanges by border

  19. Opportunities and Challenges of AC/DC Transmission Network Planning Considering High Proportion Renewable Energy

    Directory of Open Access Journals (Sweden)

    Arslan Habib

    2018-03-01

    Full Text Available The time and space distribution characteristics of future high proportion of renewable energy sources will bring unprecedented challenges to the electric power system’s processing and planning, the basic form of electric power system and operating characteristics will have fundamental changes. Based on the research status quo at home and abroad, this paper expounds the four scientific problems of the transmission network planning with high proportion of renewable energy. Respectively, from the network source collaborative planning, transmission network flexible planning. With the distribution network in conjunction with the transmission network planning, transmission planning program comprehensive evaluation and decision-making methods. This paper puts forward the research ideas and framework of transmission network planning considering the high proportion of renewable energy. At the end, the future high proportion of (renewable energy grid-connected transmission network’s opportunities and challenges are presented.

  20. Design requirements document for the phase 1 privatization electrical power system

    Energy Technology Data Exchange (ETDEWEB)

    Singh, G.

    1997-10-31

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract.

  1. Design requirements document for the phase 1 privatization electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract

  2. Study on Tower Models for EHV Transmission Line

    Directory of Open Access Journals (Sweden)

    Xu Bao-Qing

    2016-01-01

    Full Text Available Lightning outage accident is one of the main factors that threat seriously the safe and reliable operation of power system. So it is very important to establish reasonable transmission tower model and evaluate the impulse response characteristic of lightning wave traveling on the transmission tower properly for determining reliable lightning protection performance. With the help of Electromagnetic Transient Program (EMTP, six 500kV tower models are built. Aiming at one line to one transformer operating mode of 500kV substation, the intruding wave overvoltage under different tower models is calculated. The effect of tower model on intruding overvoltage has been studied. The results show that different tower models can result in great differences to the calculation results. Hence, reasonable selection of the tower model in the calculation of back- strike intruding wave is very important.

  3. ALGORITHMIZATION OF PROBLEMS FOR OPTIMAL LOCATION OF TRANSFORMERS IN SUBSTATIONS OF DISTRIBUTED NETWORKS

    Directory of Open Access Journals (Sweden)

    M. I. Fursanov

    2014-01-01

    Full Text Available This article reflects algorithmization of search methods of effective replacement of consumer transformers in distributed electrical networks. As any electrical equipment of power systems, power transformers have their own limited service duration, which is determined by natural processes of materials degradation and also by unexpected wear under different conditions of overload and overvoltage. According to the standards, adapted by in the Republic of Belarus, rated service life of power transformers is 25 years. But it can be situations that transformers should be better changed till this time – economically efficient. The possibility of such replacement is considered in order to increase efficiency of electrical network operation connected with its physical wear and aging.In this article the faults of early developed mathematical models of transformers replacement were discussed. Early such worked out transformers were not used. But in practice they can be replaced in one substation but they can be successfully used  in other substations .Especially if there are limits of financial resources and the replacement needs more detail technical and economical basis.During the research the authors developed the efficient algorithm for determining of optimal location of transformers at substations of distributed electrical networks, based on search of the best solution from all sets of displacement in oriented graph. Suggested algorithm allows considerably reduce design time of optimal placement of transformers using a set of simplifications. The result of algorithm’s work is series displacement of transformers in networks, which allow obtain a great economic effect in comparison with replacement of single transformer.

  4. An Auto Tuning Substation Peak Shaving Controller for Congestion Management Using Flexible Demand

    DEFF Research Database (Denmark)

    Sossan, Fabrizio; Marinelli, Mattia

    2013-01-01

    A closed loop substation peak shaving/congestion management controller for radial distribution networks is presented. The controller it uses an individual control signal in order to shift the consumption of a population of demand side resources, DSRs. The controller auto tunes its parameters on...

  5. ACHP | Energy Development, Transmission, and Historic Preservation

    Science.gov (United States)

    with a focus on facilitating and expanding production within our borders, as well as creating the . While technologies vary (solar, wind, geo-thermal, bio-fuels, etc.), the challenges for the management proposing energy and transmission projects on federal land CEQ and ACHP's Handbook on Integrating NEPA and

  6. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  7. Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

  8. 75 FR 68607 - CenterPoint Energy-Illinois Gas Transmission Company; Notice of Baseline Filing

    Science.gov (United States)

    2010-11-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10-80-001] CenterPoint Energy--Illinois Gas Transmission Company; Notice of Baseline Filing November 1, 2010. Take notice that on October 28, 2010, CenterPoint Energy--Illinois Gas Transmission Company submitted a revised...

  9. A comparison of magnetic fields inside and outside high-voltage urban 110-kV power substations with the exposure recommendations of the Ukrainian regulatory authorities

    International Nuclear Information System (INIS)

    Okun, Oleksandr; Shevchenko, Sergey; Korpinen, Leena

    2013-01-01

    The aim of this study was to carry out theoretical investigations of power frequency magnetic fields (MFs), produced inside and outside the domain of urban 110-kV power substations and to establish a correspondence between the levels of the fields and the specified population limits as defined by Ukrainian regulations. The fields produced by high-voltage substations were studied based on the application of the numerical finite element methodology. The investigations have shown that magnetic flux density values calculated inside and outside the considered 110-kV power substations do not reach the exposure limits specified by the Ukrainian regulations (1750 μT) and by international guidelines (ICNIRP 2010). Inside the domain of the substation, the maximum value of MFs was found under the 10-kV bus-bars and it equalled 420 μT. (authors)

  10. New conceptual design for offshore wind power substations; Nuevo diseño conceptual de subestación eólica marina

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2016-07-01

    The presentation of the new offshore wind power substation project, Marin-el, took place last December at an event held at the Higher School of Naval Engineering (ETSIN), part of the Universidad Politécnica de Madrid (UPM). The project is headed up by Iberdrola and backed by the Government of the Basque Country with a project consortium featuring the participation of the Tecnalia technological centre and the Construcciones Navales del Norte (La Naval) shipyard among other firms from the naval and renewable energies sectors. (Author)

  11. Microwave energy transmission test toward the SPS using the space station

    Energy Technology Data Exchange (ETDEWEB)

    Kaya, N.; Matsumoto, H.; Miyatake, S.; Kimura, I.; Nagatomo, M.

    1986-12-01

    An outline of a project METT (Microwave Energy Transmission Test) using the Space Station is described. The objectives of the METT are to develop and test the technology of microwave energy transmission for the future Solar Power Satellite (SPS), and to estimate the environmental effects of the high power microwaves on the ionosphere and the atmosphere. Energy generated with solar cells is transmitted from a transmitting antenna on the bus platform near the Space Station to a rectenna on the sub-satellite or the ground station in order to test the total efficiency and the functions of the developed system of the energy transmission. Plasma similar to that in the D and E layers in the ionosphere is produced in a large balloon opened on the sub-satellite in order to investigate possible interactions between the SPS microwave and the ionospheric plasma and to determine the maximum power density of the microwave beam which passes through the ionosphere.

  12. Wireless data transmission for high energy physics applications

    Science.gov (United States)

    Dittmeier, Sebastian; Brenner, Richard; Dancila, Dragos; Dehos, Cedric; De Lurgio, Patrick; Djurcic, Zelimir; Drake, Gary; Gonzalez Gimenez, Jose Luis; Gustafsson, Leif; Kim, Do-Won; Locci, Elizabeth; Pfeiffer, Ullrich; Röhrich, Dieter; Rydberg, Anders; Schöning, André; Siligaris, Alexandre; Soltveit, Hans Kristian; Ullaland, Kjetil; Vincent, Pierre; Rodriguez Vazquez, Pedro; Wiedner, Dirk; Yang, Shiming

    2017-08-01

    Silicon tracking detectors operated at high luminosity collider experiments pose a challenge for current and future readout systems regarding bandwidth, radiation, space and power constraints. With the latest developments in wireless communications, wireless readout systems might be an attractive alternative to commonly used wired optical and copper based readout architectures. The WADAPT group (Wireless Allowing Data and Power Transmission) has been formed to study the feasibility of wireless data transmission for future tracking detectors. These proceedings cover current developments focused on communication in the 60 GHz band. This frequency band offers a high bandwidth, a small form factor and an already mature technology. Motivation for wireless data transmission for high energy physics application and the developments towards a demonstrator prototype are summarized. Feasibility studies concerning the construction and operation of a wireless transceiver system have been performed. Data transmission tests with a transceiver prototype operating at even higher frequencies in the 240 GHz band are described. Data transmission at rates up to 10 Gb/s have been obtained successfully using binary phase shift keying.

  13. On Maximizing the Throughput of Packet Transmission under Energy Constraints.

    Science.gov (United States)

    Wu, Weiwei; Dai, Guangli; Li, Yan; Shan, Feng

    2018-06-23

    More and more Internet of Things (IoT) wireless devices have been providing ubiquitous services over the recent years. Since most of these devices are powered by batteries, a fundamental trade-off to be addressed is the depleted energy and the achieved data throughput in wireless data transmission. By exploiting the rate-adaptive capacities of wireless devices, most existing works on energy-efficient data transmission try to design rate-adaptive transmission policies to maximize the amount of transmitted data bits under the energy constraints of devices. Such solutions, however, cannot apply to scenarios where data packets have respective deadlines and only integrally transmitted data packets contribute. Thus, this paper introduces a notion of weighted throughput, which measures how much total value of data packets are successfully and integrally transmitted before their own deadlines. By designing efficient rate-adaptive transmission policies, this paper aims to make the best use of the energy and maximize the weighted throughput. What is more challenging but with practical significance, we consider the fading effect of wireless channels in both offline and online scenarios. In the offline scenario, we develop an optimal algorithm that computes the optimal solution in pseudo-polynomial time, which is the best possible solution as the problem undertaken is NP-hard. In the online scenario, we propose an efficient heuristic algorithm based on optimal properties derived for the optimal offline solution. Simulation results validate the efficiency of the proposed algorithm.

  14. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Andrew; Phadke, Amol; Wiser, Ryan

    2010-02-16

    Building transmission to reach renewable energy (RE) goals requires coordination among renewable developers, utilities and transmission owners, resource and transmission planners, state and federal regulators, and environmental organizations. The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this report we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33% of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Of the renewable resources in WREZ resource hubs, and under the assumptions described in this report, our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33% RE target across nearly all scenarios analyzed (38-65%). Solar energy is almost always the second largest source (14-41%). Solar exceeds wind by a small margin only when solar thermal energy is assumed to experience cost reductions relative to all other technologies. Biomass, geothermal, and hydropower are found to represent a smaller portion of the selected resources, largely due to the limited resource quantity of these resources identified within the WREZ-identified hubs (16-23% combined). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Uncertainties and policies that impact bus-bar costs are the most important to evaluate carefully, but

  15. Interregional power transmission: a component in planning for renewable energy technologies

    International Nuclear Information System (INIS)

    Krueger Nielsen, S.; Soerensen, B.

    2000-01-01

    We discuss the role played by interregional power transmission on the basis of recent scenario work. In a project dealing with long-term planning for energy efficiency and renewable energy in Europe we modelled a scenario for the present 15 EU countries' energy system in 2050. The basis for the scenario is the concept of 'fair pricing' for energy services, meaning that the price of energy should reflect all externalities, but not otherwise be taxed or subsidized. The project assessed resource availability and expected technology price developments over time for a number of energy-related technologies, both on the supply side, the intermediate conversion chain and on the demand side. Among these, transmission technologies play an important role, both in smoothing out renewable energy supplies within the European Union region, and also allowing substantial import of energy from countries outside the EU having a surplus of renewable energy based power. (orig.)

  16. Development of expert system software to improve performance of high-voltage arresters in substations

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Andre Nunes de; Oltremari, Anderson; Zago, Maria Goretti; Silva, Paulo Sergio da; Costa Junior, Pedro da; Ferraz, Kleber [Sao Paulo State Univ. (UNESP), Bauru, SP (Brazil). Lab. of Power Systems and Intelligent Techniques], E-mail: andrejau@feb.unesp.br; Gusmao, Euripedes Silva; Prado, Jose Martins [ELETRONORTE, MT (Brazil)], E-mail: euripedes.gusmao@eln.gov.br

    2007-07-01

    One of the main causes of interruption and power outage on the energy distribution system in Brazil is related to lightning, which is also the main responsible by the reduction of service life and destruction of consumers and Utilities' equipment. As a manner of improving the protection of the energy distribution system, the Utilities have given attention on establishing maintenance techniques, such preventive as predictive, of the high-voltage arresters in substation. Currently, one of the main manners to obtain the installed arresters' characteristics involves the utilization of high cost equipment, such as leakage current meters. In this way, this paper aims to fulfill the needs of obtaining reliable results with the utilization of lower cost equipment, proposing a Expert System Software for diagnosing and aiding to decision through the utilization of intelligent techniques, which makes possible the monitoring of service life and the identification of aged arresters, allowing the establishment of one reliable chronogram for the removal of equipment, such for maintenance as for substitution. (author)

  17. Development of an accurate transmission line fault locator using the global positioning system satellites

    Science.gov (United States)

    Lee, Harry

    1994-01-01

    A highly accurate transmission line fault locator based on the traveling-wave principle was developed and successfully operated within B.C. Hydro. A transmission line fault produces a fast-risetime traveling wave at the fault point which propagates along the transmission line. This fault locator system consists of traveling wave detectors located at key substations which detect and time tag the leading edge of the fault-generated traveling wave as if passes through. A master station gathers the time-tagged information from the remote detectors and determines the location of the fault. Precise time is a key element to the success of this system. This fault locator system derives its timing from the Global Positioning System (GPS) satellites. System tests confirmed the accuracy of locating faults to within the design objective of +/-300 meters.

  18. Exploration of resource and transmission expansion decisions in the Western Renewable Energy Zone initiative

    International Nuclear Information System (INIS)

    Mills, Andrew; Phadke, Amol; Wiser, Ryan

    2011-01-01

    The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this paper we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33% of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33% RE target across nearly all scenarios analyzed (38-65%). Solar energy is almost always the second largest source (14-41%). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Further, we find that even with total transmission expenditures of $17-34 billion these costs still represent just 10-19% of the total delivered cost of renewable energy. - Research highlights: → We describe a new tool to evaluate transmission expansion and renewable resource selection. → We examine a scenario where 33% of the energy in the Western Interconnection comes from renewables. → Wind energy provides the majority of new renewable energy. → For some loads, the decision to procure wind and the required transmission is insensitive to assumptions. → For other loads, assumptions can shift toward more solar, which also changes the needed transmission.

  19. On the Energy Efficiency of Dual Clutch Transmissions and Automated Manual Transmissions

    Directory of Open Access Journals (Sweden)

    Fabio Vacca

    2017-10-01

    Full Text Available The main benefits of dual clutch transmissions (DCTs are: (i a higher energy efficiency than automatic transmission systems with torque converters; and (ii the capability to fill the torque gap during gear shifts to allow seamless longitudinal acceleration profiles. Therefore, DCTs are viable alternatives to automated manual transmissions (AMTs. For vehicles equipped with engines that can generate considerable torque, large clutch-slip energy losses occur during power-on gear shifts and, as a result, DCTs need wet clutches for effective heat dissipation. This requirement substantially reduces DCT efficiency because of the churning and ancillary power dissipations associated with the wet clutch pack. To the knowledge of the authors, this study is the first to analyse the detailed power loss contributions of a DCT with wet clutches, and their relative significance along a set of driving cycles. Based on these results, a novel hybridised AMT (HAMT with a single dry clutch and an electric motor is proposed for the same vehicle. The HAMT architecture combines the high mechanical efficiency typical of AMTs with a single dry clutch, with the torque-fill capability and operational flexibility allowed by the electric motor. The measured efficiency maps of a case study DCT and HAMT are compared. This is then complemented by the analysis of the respective fuel consumption along the driving cycles, which is simulated with an experimentally validated vehicle model. In its internal combustion engine mode, the HAMT reduces fuel consumption by >9% with respect to the DCT.

  20. Simulation Of Substation HV/MV In DIGSILENT Power Factory Software

    International Nuclear Information System (INIS)

    Mladenovski, Ljubisha; Dimova, Iskra; Iliev, Atanas; Fushtikj, Vangel

    2003-01-01

    This paper presents a method for creating a model for substation high voltage/middle voltage (HV/MV) that supplies consumers at middle voltage side and capacitor battery that regulates the voltage at the middle voltage busbar. The results from the analyses are presented and discussed. The models of the transformer and the capacitor battery were made at the University of Rostock, Germany, in DYSIMAC (DYnaniic SImulation of the MACedonian power plants in a new technological and market environment) project. (Author)

  1. Energy-Efficient Algorithm for Sensor Networks with Non-Uniform Maximum Transmission Range

    Directory of Open Access Journals (Sweden)

    Yimin Yu

    2011-06-01

    Full Text Available In wireless sensor networks (WSNs, the energy hole problem is a key factor affecting the network lifetime. In a circular multi-hop sensor network (modeled as concentric coronas, the optimal transmission ranges of all coronas can effectively improve network lifetime. In this paper, we investigate WSNs with non-uniform maximum transmission ranges, where sensor nodes deployed in different regions may differ in their maximum transmission range. Then, we propose an Energy-efficient algorithm for Non-uniform Maximum Transmission range (ENMT, which can search approximate optimal transmission ranges of all coronas in order to prolong network lifetime. Furthermore, the simulation results indicate that ENMT performs better than other algorithms.

  2. Multitasking metering enhances generation, transmission operations

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, E.

    2008-11-15

    The Dairyland Power Cooperative (DPC) which operates from La Crosse, Wisconsin has the capacity to generate and transmit 1000 MW of power to 25 member cooperatives and 20 municipalities who serve over 500,000 customers. When DPC was experiencing diminished service within its analog cellular-based data communications system, it was presented with an opportunity to install a new automated telecommunications system that would provide secure collection of meter readings from all of its substations. DPC decided to evaluate an advanced multifunctional digital meter from Schweitzer Engineering Laboratories (SEL). The SEL-734 Revenue Metering System offers complete instantaneous metering functions, including voltages, currents, power, energy and power factor. Other capabilities include predictive demand, time-of-use metering, automatic voltage monitoring, harmonics metering and synchrophasor measurement. From a metering perspective, DPC wanted to perform daily load profiles and interval-by-interval metering of their delivery points for billing purposes. They also wanted to provide real-time monitoring of electricity being delivered for both generation and transmission purposes and to make that information available to a distribution SCADA system for their members. The SEL-734 Revenue Meter was well suited to those needs. The SEL-734 provides very high-accuracy energy metering, load profile data collection, instantaneous power measurements, power quality monitoring, and communicates simultaneously over a modem, serial ports, and wide area networks (WAN). The meter is backed with a ten-year warranty as well as field support engineers. 5 figs.

  3. Alternative forms of energy transmission from OTEC plants. [Chemical and electrical

    Energy Technology Data Exchange (ETDEWEB)

    Konopka, A.; Biederman, N.; Talib, A.; Yudow, B.

    1977-01-01

    The transmission of OTEC-derived chemical and electrical energy is compared. The chemical energy-carriers considered are the following: gaseous and liquid hydrogen, liquid ammonia, methanol, gasoline, hydrazine hydrate, anhydrous hydrazine, unsymmetrical dimethylhydrazine (UDMH), 1,7-Octadiyne, and tetrahydrodicyclopentadiene. The assessment assumes that each of the above energy carriers were transported by barge and/or pipeline. The delivered costs were then compared with transmission of electricity by submarine cables. Because chemical and electrical energy are not equivalent, however, their comparison can only be done after the outputs are converted to a common form. Thus, in addition to presenting the delivered cost and overall energy efficiency of the chemical energy-carriers, we have provided a discussion of the equipment, costs, and efficiencies of converting the hydrogen and ammonia delivered into electricity, and the electricity delivered into hydrogen and ammonia. A concise technical assessment and economic analysis of components associated with the conversion, storage, transportation, and shore-based receiving facilities for the conversion of OTEC mechanical energy to chemical energy is provided and compared to the conversion and transmission of electrical power. Results concerning the hydrogen and ammonia analysis were determined as part of the OTEC program at IGT from May 1975 through May 1976 under Contract No. NSF-C1008 (AER-75-00033) with the National Science Foundation and ERDA. Information concerning carbonaceous fuels and high-energy fuels production was developed as part of the current IGT OTEC program under Contract No. E(49-18)-2426 with ERDA.

  4. Large-scale wind energy application. Transporting wind energy over long distances using an HVDC transmission line, in combination with hydro energy or biomass energy

    International Nuclear Information System (INIS)

    Coelingh, J.P.; Van Wijk, A.J.M.; Betcke, J.W.H.; Geuzendam, C.; Gilijamse, W.; Westra, C.A.; Curvers, A.P.W.M.; Beurskens, H.J.M.

    1995-08-01

    The main objective of the study on the title subject is to assess the long-term prospects for large-scale application of wind energy, in combination with hydro energy in Norway and in combination with biomass energy in Scotland. These countries have high wind resource areas, however they are located far away from load centres. The development of new transmission technologies as High Voltage Direct Current (HVDC) transmission lines, in combination with highly suitable places for wind energy in Norway and Scotland, forms the driving force behind this study. The following two cases are being considered: (1) a large-scale wind farm (1,000 MW) in Norway from which electricity is transmitted to The Netherlands by using an HVDC transmission line, in combination with hydro energy. Hydro energy already makes a large contribution to the energy supply of Norway. Wind farms can contribute to the electricity production and save hydro energy generated electricity and make the export of electricity profitable; and (2) a large-scale wind farm (1,000 MW) in Scotland from which electricity is transmitted to The Netherlands by using an HVDC transmission line, in combination with biomass energy. Scotland has a large potential for biomass production such as energy crops and forestry. Poplars and willows cultivated on set-aside land can be gasified and fed into modern combined-cycle plants to generate electricity. In Scotland the usable potential of wind energy may be limited in the short and medium term by the capacity of the grid. New connections can overcome this constraint and allow wind energy to be treated as a European Union resource rather than as a national resource. Thus, the concept of this study is to look at the possibilities of making a 1,000 MW link from The Netherlands to Norway or to Scotland, in order to supply electricity at competitive costs generated with renewable energy sources. 16 figs., 24 tabs., 80 refs

  5. 76 FR 37809 - The Connecticut Transmission Municipal Electric Energy Cooperative; Notice of Request for Waiver...

    Science.gov (United States)

    2011-06-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11-4-000] The Connecticut Transmission Municipal Electric Energy Cooperative; Notice of Request for Waiver or Exemption Take notice that on June 8, 2011, the Connecticut Transmission Municipal Electric Energy Cooperative filed a petition...

  6. A health examination of railway high-voltage substation workers exposed to ELF electromagnetic fields.

    Science.gov (United States)

    Baroncelli, P; Battisti, S; Checcucci, A; Comba, P; Grandolfo, M; Serio, A; Vecchia, P

    1986-01-01

    This is a cross-sectional survey on the health conditions of railways workers active in 258 interconnection and conversion substations all over Italy. Measurements performed in both kinds of substations operating at 220 kV have shown that maximum levels of the electric field strength and of the magnetic flux density at 50 Hz are of the order of 5 kV/m and 15 microT, respectively. Three subject groups, differently exposed (1, 10, 20 h/week), and an unexposed control group, for a total number of 627 workers, constitute the population at study. All subjects underwent a general medical examination, laboratory investigations, and a series of selected examinations relative to three systems (nervous, cardiovascular, and haematopoietic) considered at higher risk. No differences have been found between the exposed and the control groups. It is concluded that workers exposed to ELF electromagnetic fields of moderate strength do not show the presence of clear effects on their state of health.

  7. Addressing preservation of elastic contrast in energy-filtered transmission electron microscopy

    Energy Technology Data Exchange (ETDEWEB)

    Brown, H.G.; D' Alfonso, A.J.; Forbes, B.D.; Allen, L.J., E-mail: lja@unimelb.edu.au

    2016-01-15

    Energy-filtered transmission electron microscopy (EFTEM) images with resolutions of the order of an Ångström can be obtained using modern microscopes corrected for chromatic aberration. However, the delocalized nature of the transition potentials for atomic ionization often confounds direct interpretation of EFTEM images, leading to what is known as “preservation of elastic contrast”. In this paper we demonstrate how more interpretable images might be obtained by scanning with a focused coherent probe and incoherently averaging the energy-filtered images over probe position. We dub this new imaging technique energy-filtered imaging scanning transmission electron microscopy (EFISTEM). We develop a theoretical framework for EFISTEM and show that it is in fact equivalent to precession EFTEM, where the plane wave illumination is precessed through a range of tilts spanning the same range of angles as the probe forming aperture in EFISTEM. It is demonstrated that EFISTEM delivers similar results to scanning transmission electron microscopy with an electron energy-loss spectrometer but has the advantage that it is immune to coherent aberrations and spatial incoherence of the probe and is also more resilient to scan distortions. - Highlights: • Interpretation of EFTEM images is complicated by preservation of elastic contrast. • More direct images obtained by scanning with a focused coherent probe and averaging. • This is equivalent to precession EFTEM through the solid angle defined by the probe. • Also yields similar results to energy-loss scanning transmission electron microscopy. • Scanning approach immune to probe aberrations and resilient to scan distortions.

  8. Data Acquisition and Transmission System for Building Energy Consumption Monitoring

    Directory of Open Access Journals (Sweden)

    Liang Zhao

    2013-01-01

    Full Text Available Building energy consumption monitoring and management system have been developed widely in China in order to gain the real-time data of energy consumption in buildings for analyzing it in the next state work. This paper describes a low-cost and small-sized collector based on the STM32 microcontroller, which can be placed in a building easily to implement the work of data acquisition, storage, and transmission. The collector gathers the electricity, water, heat, and energy consumption data through the RS485 field bus and stores the data into an SD card with mass storage, finally, using Internet to finish the communication and transmission to data server through TCP protocol. The collector has been used in application for two years, and the results show that the system is reliable and stable.

  9. A distributed substation automation model based on the multi-agents technology; Um modelo distribuido de automacao de subestacoes baseado em tecnologia multiagentes

    Energy Technology Data Exchange (ETDEWEB)

    Geus, Klaus de; Milsztajn, Flavio; Kolb, Carlos Jose Johann; Dometerco, Jose Henrique; Souza, Alexandre Mendonca de; Braga, Ciro de Carvalho; Parolin, Emerson Luis; Frisch, Arlenio Carneiro; Fortunato Junior, Luiz Kiss; Erzinger Junior, Augusto; Jonack, Marco Antonio; Guiera, Anderson Juliano Azambuja [Companhia Paranaense de Energia (COPEL), Curitiba, PR (Brazil)]. E-mail: klaus@copel.com; flaviomil@copel.com; kolb@copel.com; dometerc@copel.com; alexandre.mendonca@copel.com; ciro@copel.com; parolin@copel.com; arlenio@copel.com; luiz.kiss@copel.com; aerzinger@copel.com; jonack@copel.com; guiera@copel.com

    2006-10-15

    The main purpose of this paper is to analyse distributed computing technology which can be used in substation automation systems. Based on performance comparative results obtained in laboratory, a specific model for distributed substation automation is proposed considering the current model employed at COPEL - Companhia Paranaense de Energia. The proposed model is based on the multi-agents technology, which has lately received special attention in the development of distributed systems with local intelligence. (author)

  10. [Study on a wireless energy transmission system for the noninvasive examination micro system inside alimentary tracts].

    Science.gov (United States)

    He, Xiu; Yan, Guo-Zheng; Wang, Fu-Min

    2008-01-01

    A wireless energy transmission system for the MEMS system inside alimentary tracts is reported here in the paper. It consists of an automatic frequency tracking circuit of phase lock loop and phase shift PWM control circuit. Experimental results show that the energy transmission system is capable of automatic frequency-tracking and transmission power-adjusting and has stable received energy.

  11. Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada

    International Nuclear Information System (INIS)

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company's (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP's original amendment request remain valid

  12. Characterization of the conformational equilibrium between the two major substates of RNase A using NMR chemical shifts.

    Science.gov (United States)

    Camilloni, Carlo; Robustelli, Paul; De Simone, Alfonso; Cavalli, Andrea; Vendruscolo, Michele

    2012-03-07

    Following the recognition that NMR chemical shifts can be used for protein structure determination, rapid advances have recently been made in methods for extending this strategy for proteins and protein complexes of increasing size and complexity. A remaining major challenge is to develop approaches to exploit the information contained in the chemical shifts about conformational fluctuations in native states of proteins. In this work we show that it is possible to determine an ensemble of conformations representing the free energy surface of RNase A using chemical shifts as replica-averaged restraints in molecular dynamics simulations. Analysis of this surface indicates that chemical shifts can be used to characterize the conformational equilibrium between the two major substates of this protein. © 2012 American Chemical Society

  13. Evolution of metering and control equipment in district heating house substations. Smaller, smarter and unchangingly robust; Mess- und Regelungstechnik fuer Fernwaermehausstationen im Wandel der Zeit. Kleiner, intelligenter, unveraendert robust

    Energy Technology Data Exchange (ETDEWEB)

    Hesse, Wolfgang; Hilbig, Thomas [Samson AG, Frankfurt am Main (Germany)

    2011-07-15

    The technical evolution of house substations in hot water networks reflects the trend towards greater efficiency. Changes are to be seen above all in the requirements placed on the measurement and control technology used in the energy management functions of the electronic district heating controller as well as on safety equipment. Here DDC (Direct Digital Control) technology has created possibilities for optimising energy consumption. The authors relate the evolution of drinking water heating, self-operated regulators, electrical actuators and of electronic district heating controllers.

  14. Simulation of the Static VAR Compensator Culiacan Three Substation for the Analysis of Transients

    Directory of Open Access Journals (Sweden)

    Coronel-Mercado Luis Enrique

    2013-06-01

    Full Text Available Since its emergence in the late 60’s the FACTS (Flexible AC Transmission Systems have been and continue to be studied and implemented in all electrical networks around the world, becoming an essential element for stability, control and maximum exploitation of thereof. One of the most used FACTS devices is the Static VAR Compensator or SVC. In this work, the modeling in Simulink of the Static VAR Compensator installed at the substation Culiacán Tres (CUT belonging to CFE is presented. The SVC is the ability of ±100 MVAR and ABB brand. The modeling was performed to visually program in detail the different subsystems in Simulink such as the timing unit, the TSC (thyristor switched capacitor, TCR (thyristor controlled reactors, filters of the 5th and the 7th harmonic, the transformer bank, the control unit, distribution unit and the measurement unit. Data for major components were taken from data sheet and equipment manuals. ASPEN software was used in order to obtain Thevenin equivalent of the EPS to connect to them the SVC model to test the step and three-phase short circuit. The results of these tests were compared with test results of commissioning of the SVC.

  15. A Mixed Transmission Strategy to Achieve Energy Balancing in Wireless Sensor Networks

    DEFF Research Database (Denmark)

    Liu, Tong; Gu, Tao; Jin, Ning

    2017-01-01

    In this paper, we investigate the problem of energy balanced data collection in wireless sensor networks, aiming to balance energy consumption among all sensor nodes during the data propagation process. Energy balanced data collection can potentially save energy consumption and prolong network...... lifetime, and hence, it has many practical implications for sensor network design and deployment. The traditional hop-by-hop transmission model allows a sensor node to propagate its packets in a hop-by-hop manner toward the sink, resulting in poor energy balancing for the entire network. To address...... the problem, we apply a slice-based energy model, and divide the problem into inter-slice and intra-slice energy balancing problems. We then propose a probability-based strategy named inter-slice mixed transmission protocol and an intra-slice forwarding technique to address each of the problems. We propose...

  16. Coordinated Voltage Control Scheme for SEIG-Based Wind Park Utilizing Substation STATCOM and ULTC Transformer

    DEFF Research Database (Denmark)

    S. El Moursi, Mohamed; Bak-Jensen, Birgitte; Abdel-Rahman, Mansour Hassan

    2011-01-01

    and optimal tracking secondary voltage control for wind parks based on self-excited induction generators which comprise STATCOM and under-load tap changer (ULTC) substation transformers. The voltage controllers for the STATCOM and ULTC transformer are coordinated and ensure the voltage support. In steady...

  17. Fault and load flows analysis of electricity transmission and distribution system in Casanare (Colombia)

    OpenAIRE

    Castro-Galeano, Juan Carlos; Cabra-Sarmiento, Wilson Javier; Ortiz-Portilla, Jhony Fernando

    2017-01-01

    Abstract This article describes a simulation of the electrical local distribution and regional transmission system of Enerca S.A. E.S.P. at 34.5 kV and 115 kV, identifying the most critical circuits and substations. The company is located in one of the major petroleum production areas in Colombia, and because of a massive growth in this sector, the electrical company expanded its networks in a radial way. This expansion was improvised and poorly planned due to the accelerated need to meet the...

  18. Compressor-less Hydrogen Transmission Pipelines Deliver Large-scale Stranded Renewable Energy at Competitive Cost

    International Nuclear Information System (INIS)

    W Leighty; J Holloway; R Merer; B Somerday; C San Marchi; G Keith; D White

    2006-01-01

    We assume a transmission-constrained world, where large new wind plants and other renewable energies must pay all transmission costs for delivering their energy to distant markets. We modeled a 1,000 MW (1 GW) (name plate) wind plant in the large wind resource of the North America Great Plains, delivering exclusively hydrogen fuel, via a new gaseous hydrogen (GH2) pipeline, to an urban market at least 300 km distant. All renewable electric energy output would be converted, at the source, to hydrogen, via 100 bar output electrolyzers, directly feeding the GH2 transmission pipeline without costly compressor stations at inlet or at midline. The new GH2 pipeline is an alternative to new electric transmission lines. We investigate whether the pipeline would provide valuable energy storage. We present a simple model by which we estimate the cost of wind-source hydrogen fuel delivered to the distant city gate in year 2010, at GW scale. Ammonia, synthetic hydrocarbons, and other substances may also be attractive renewable-source energy carriers, storage media, and fuels; they are not considered in this paper. (authors)

  19. Expert systems in power substation operation and control

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Guilherme Moutinho; Lambert-Torres, Germano; Silva, Alexandre P. Alves da [Escola Federal de Engenharia de Itajuba, MG (Brazil)

    1994-12-31

    With digital technology being increasingly adopted in power substations (SE), perspectives are created for integration of supervision, control and protection systems in addition to making its process automation feasible. Once a SE is digitalized, the systems which previously were implemented physically will be able to be implemented by means of computer programs (software), allowing the expansion of its scope of operation. Studies and research performed at the international level have pointed to the utilization of Expert Systems (ES) as a more suitable alternative for representation and solution of the operation and control problems, especially those which do not have an established theory, which are provided with diagnosis characteristics and that associate themselves with fuzzy data and information. (author) 4 refs., 3 figs.

  20. Functional utilization of control and digital protection systems in distribution substations; Aproveitamento funcional de sistemas de controle e protecao digitais em subestacoes de distribuicao

    Energy Technology Data Exchange (ETDEWEB)

    Brittes, Jose Luiz Pereira

    1996-07-01

    The application of Digital Protection and Control Systems (DPCS) in Utilities substations is a fundamental part for their Information System. Technological progress in Telematics provides nowadays, the implementation of open digital systems. But it is the wide exploitation of its potentiality that will be one of the survival factor in the competitive and multi-affair environment dictated by the new worldwide economical order. This exploitation is carried out in three levels inside the substation: at bay level, with inherent technological benefits, such as more efficient and reliable protection, data acquisition and registration, and smart control; at central level (substation), by the implantation of automatics with enormous operational and management profits; and a remote level, to whom DPCS's transpire like a very sophisticated large frame remote terminal units. (author)

  1. Functional utilization of control and digital protection systems in distribution substations; Aproveitamento funcional de sistemas de controle e protecao digitais em subestacoes de distribuicao

    Energy Technology Data Exchange (ETDEWEB)

    Brittes, Jose Luiz Pereira

    1996-07-01

    The application of Digital Protection and Control Systems (DPCS) in Utilities substations is a fundamental part for their Information System. Technological progress in Telematics provides nowadays, the implementation of open digital systems. But it is the wide exploitation of its potentiality that will be one of the survival factor in the competitive and multi-affair environment dictated by the new worldwide economical order. This exploitation is carried out in three levels inside the substation: at bay level, with inherent technological benefits, such as more efficient and reliable protection, data acquisition and registration, and smart control; at central level (substation), by the implantation of automatics with enormous operational and management profits; and a remote level, to whom DPCS's transpire like a very sophisticated large frame remote terminal units. (author)

  2. Cross Layer Design for Optimizing Transmission Reliability, Energy Efficiency, and Lifetime in Body Sensor Networks.

    Science.gov (United States)

    Chen, Xi; Xu, Yixuan; Liu, Anfeng

    2017-04-19

    High transmission reliability, energy efficiency, and long lifetime are pivotal issues for wireless body area networks (WBANs. However, these performance metrics are not independent of each other, making it hard to obtain overall improvements through optimizing one single aspect. Therefore, a Cross Layer Design Optimal (CLDO) scheme is proposed to simultaneously optimize transmission reliability, energy efficiency, and lifetime of WBANs from several layers. Firstly, due to the fact that the transmission power of nodes directly influences the reliability of links, the optimized transmission power of different nodes is deduced, which is able to maximize energy efficiency in theory under the premise that requirements on delay and jitter are fulfilled. Secondly, a relay decision algorithm is proposed to choose optimized relay nodes. Using this algorithm, nodes will choose relay nodes that ensure a balance of network energy consumption, provided that all nodes transmit with optimized transmission power and the same packet size. Thirdly, the energy consumption of nodes is still unbalanced even with optimized transmission power because of their different locations in the topology of the network. In addition, packet size also has an impact on final performance metrics. Therefore, a synthesized cross layer method for optimization is proposed. With this method, the transmission power of nodes with more residual energy will be enhanced while suitable packet size is determined for different links in the network, leading to further improvements in the WBAN system. Both our comprehensive theoretical analysis and experimental results indicate that the performance of our proposed scheme is better than reported in previous studies. Relative to the relay selection and power control game (RSPCG) scheme, the CLDO scheme can enhance transmission reliability by more than 44.6% and prolong the lifetime by as much as 33.2%.

  3. Man-entry grid and power substations in Germany; Begehbare Netz- und Uebergabestationen in Deutschland

    Energy Technology Data Exchange (ETDEWEB)

    Primus, Illo-Frank

    2010-11-15

    Since the first publication of an electrotechnical standard for factory-assembled stations in 1997, grid and power substations in Germany as a rule are not constructed on site - with some exceptions, e.g. large-scale switching stations - but as prefabricated, factory-assembled concrete structures. There are two types of stations depending on the producer.

  4. Nanoporous metal film: An energy-dependent transmission device for electron waves

    International Nuclear Information System (INIS)

    Grech, S.; Degiovanni, A.; Lapena, L.; Morin, R.

    2011-01-01

    We measure electron transmission through free-standing ultrathin nanoporous gold films, using the coherent electron beam emitted by sharp field emission tips in a low energy electron projection microscope setup. Transmission coefficient versus electron wavelength plots show periodic oscillations between 75 and 850 eV. These oscillations result from the energy dependence of interference between paths through the gold and paths through the nanometer-sized pores of the film. We reveal that these films constitute high transmittance quantum devices acting on electron waves through a wavelength-dependent complex transmittance defined by the porosity and the thickness of the film.

  5. Fraser Valley System Reinforcement Project: Environmental planning and assessment report

    International Nuclear Information System (INIS)

    1991-06-01

    Transmission facilities in the south central Fraser Valley, British Columbia, need reinforcement in order to meet anticipated growth in power demand. This objective could be met by reinforcing substation facilities (adding 500-kV equipment and connection to transmission line 5L41) at the McLellan Substation in Surrey, at the Clayburn Substation in Matsqui, or at the Atchelitz Substation in Chilliwack. An assessment is provided of the environmental evaluation criteria applied to these potential sites for substation reinforcement and the rationale for selection of the Clayburn site as the environmentally most effective alternative. The Clayburn site is already cleared and managed for a 230-kV substation; environmental, land use, and socioeconomic impacts are considered manageable. The existing right-of-way for the 500-kV loop in to the substation can be utilized. In addition, the results of an environmental assessment and mitigation plan for the Clayburn substation reinforcement are described. The most significant factors that will require possible mitigative measures include fisheries, water quality, floodplain management, visual and recreational aspects, and heritage resources. 16 figs., 5 tabs

  6. The insulation coordination and surge arrester design for HTS cable system in Icheon substation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hansang, E-mail: Hansang80@korea.ac.kr [School of Railway and Electrical Engineering, Kyungil University, Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do 712-701 (Korea, Republic of); Yoon, Dong-Hee [Department of New and Renewable Energy, Kyungil University, Hayang-eup, Gyeongsan-si, Gyeongsangbuk-do 712-701 (Korea, Republic of); Lee, Seung-Ryul [Korea Electrotechnology Research Institute, Naeson-dong, Uiwang-si, Gyeonggi-do 437-080 (Korea, Republic of); Yang, Byeong-Mo [Korea Electric Power Research Institute, Munji-dong, Yuseong-gu, Daejeon 305-760 (Korea, Republic of); Jang, Gilsoo, E-mail: gjang@korea.ac.kr [School of Electrical Engineering, Korea University, Anam-dong 5-ga, Seongbuk-gu, Seoul 136-713 (Korea, Republic of)

    2013-01-15

    Highlights: ► It is necessary to study lightning response of the HTS cable. ► The analytic model has been developed for the HTS cable in the Icheon substation. ► Well-designed surge arrester has been verified through PSCAD/EMTDC simulations. -- Abstract: This paper proposes an insulation coordination and surge arrester design for HTS (High-Temperature Superconducting) cable system in Icheon substation in Korea. In the aspect of the economic analysis, since the HTS cable is very expensive, the insulation coordination to prevent the dielectric breakdown caused by the lightning surge should be considered carefully. Also, in the aspect of the power system reliability, since the HTS cable has much more capacity compared than conventional power cables and the ripple effect from the HTS cable failure may lead to the wide area blackout, an intensive study for insulation coordination from lightning surge is one of the most important considerations. In this paper, the insulation coordination for lightning surge is verified using HTS cable and power equipment models and the design of the proper surge arrester is proposed.

  7. submitter Superconducting transmission lines – Sustainable electric energy transfer with higher public acceptance?

    CERN Document Server

    Thomas, Heiko; Chervyakov, Alexander; Stückrad, Stefan; Salmieri, Delia; Rubbia, Carlo

    2016-01-01

    Despite the extensive research and development investments into superconducting science and technology, both at the fundamental and at the applied levels, many benefits of superconducting transmission lines (SCTL) remain unknown to the public and decision makers at large. This paper aims at informing about the progress in this important research field. Superconducting transmission lines have a tremendous size advantage and lower total electrical losses for high capacity transmission plus a number of technological advantages compared to solutions based on standard conductors. This leads to a minimized environmental impact and enables an overall more sustainable transmission of electric energy. One of the direct benefits may be an increased public acceptance due to the low visual impact with a subsequent reduction of approval time. The access of remote renewable energy (RE) sources with high-capacity transmission is rendered possible with superior efficiency. That not only translates into further reducing $CO_2...

  8. 浅谈风电场110kV变电站工程建设管理%Analysis on the Construction Management of 110 kV Substation Project in Wind Farm

    Institute of Scientific and Technical Information of China (English)

    2013-01-01

      变电站是风电场必备的集电、送电系统,其主要功能是将风电机组所发电能汇集后,通过高压线路输送到电网上。%Substation is a requisite power system for collecting and delivering electricity in wind farm. Its main function is to gather electricity generated by wind turbines and delivery the electricity to grid through the high voltage cable. The substation is a hub that connects wind farm and grid,which plays a crucial role in delivering and saleing the electricity in wind farm. e paper analyzed the engineering design, construction, commissioning and acceptance of the 110KV substation of Helan Mountain Wind Farm in Azuoqi, Inner Mongolia, explored the scienti c and rational construction techniques and modes in the process of wind farm substation engineering and provided reference for the substation construction and management of wind farm in the future.

  9. Kinematic analysis and simulation of a substation inspection robot guided by magnetic sensor

    Science.gov (United States)

    Xiao, Peng; Luan, Yiqing; Wang, Haipeng; Li, Li; Li, Jianxiang

    2017-01-01

    In order to improve the performance of the magnetic navigation system used by substation inspection robot, the kinematic characteristics is analyzed based on a simplified magnetic guiding system model, and then the simulation process is executed to verify the reasonability of the whole analysis procedure. Finally, some suggestions are extracted out, which will be helpful to guide the design of the inspection robot system in the future.

  10. Energy storage and alternatives to improve train voltage on a mass transit system

    Science.gov (United States)

    Gordon, S. P.; Rorke, W. S.

    1995-04-01

    The wide separation of substations in the Bay Area Rapid Transit system's transbay tunnel contributes to voltage sag when power demand is high. In the future, expansions to the system will exacerbate this problem by increasing traffic density. Typically, this situation is remedied through the installation of additional substations to increase the system's power capacity. We have evaluated the efficacy of several alternatives to this approach - specifically, installation of an 8 megajoule energy storage system, modification of the existing substations, or reduction of the resistance of the running rails or the third rail. To support this analysis, we have developed a simple model of the traction power system in the tunnel. We have concluded that the storage system does not have sufficient capacity to deal with the expected voltage sags; in this application, the alternatives present more effective solutions. We have also investigated the potential impact of these system upgrades on expected future capital outlays by BART for traction power infrastructure additions. We have found that rail or substation upgrades may reduce the need for additional substations. These upgrades may also be effective on other parts of the BART system and on other traction power systems.

  11. Regional Transmission Organizations and Wind Energy: A Happy Marriage or Divorce Proceedings?; Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Parsons, B.; Porter, K.

    2002-05-01

    In 1996, the Federal Energy Regulatory Commission (FERC) issued Order 888, which required transmission-owning utilities under FERC jurisdiction to provide open access transmission service to eligible wholesale power customers. Among other things, the elements of electric service are unbundled, meaning that wind project developers must not only find a taker for the energy but also potentially make interconnection, ancillary service, and transmission arrangements for their wind projects. In 1999, the FERC issued Order 2000, which required transmission-owning utilities to file an intent with FERC on whether they have joined or plan to join a regional transmission organization (RTO). Order 2000 also required RTOs to meet certain criteria and be approved by FERC in order to begin operations as an RTO. More recently, FERC said it would issue a Notice of Proposed Rulemaking in 2002 on certain requirements and services, often termed''standard market design'' (SMD), that must be included in all transmission tariffs filed at FERC. This paper discusses the chronology of open access transmission issues, from Order 888 onward, and reviews some of the important issues raised by FERC's SMD initiative.

  12. Prediction of transmission loss through an aircraft sidewall using statistical energy analysis

    Science.gov (United States)

    Ming, Ruisen; Sun, Jincai

    1989-06-01

    The transmission loss of randomly incident sound through an aircraft sidewall is investigated using statistical energy analysis. Formulas are also obtained for the simple calculation of sound transmission loss through single- and double-leaf panels. Both resonant and nonresonant sound transmissions can be easily calculated using the formulas. The formulas are used to predict sound transmission losses through a Y-7 propeller airplane panel. The panel measures 2.56 m x 1.38 m and has two windows. The agreement between predicted and measured values through most of the frequency ranges tested is quite good.

  13. Potential impacts of nanotechnology on energy transmission applications and needs.

    Energy Technology Data Exchange (ETDEWEB)

    Elcock, D.; Environmental Science Division

    2007-11-30

    The application of nanotechnologies to energy transmission has the potential to significantly impact both the deployed transmission technologies and the need for additional development. This could be a factor in assessing environmental impacts of right-of-way (ROW) development and use. For example, some nanotechnology applications may produce materials (e.g., cables) that are much stronger per unit volume than existing materials, enabling reduced footprints for construction and maintenance of electricity transmission lines. Other applications, such as more efficient lighting, lighter-weight materials for vehicle construction, and smaller batteries having greater storage capacities may reduce the need for long-distance transport of energy, and possibly reduce the need for extensive future ROW development and many attendant environmental impacts. This report introduces the field of nanotechnology, describes some of the ways in which processes and products developed with or incorporating nanomaterials differ from traditional processes and products, and identifies some examples of how nanotechnology may be used to reduce potential ROW impacts. Potential environmental, safety, and health impacts are also discussed.

  14. Effects of channel blocking on information transmission and energy efficiency in squid giant axons.

    Science.gov (United States)

    Liu, Yujiang; Yue, Yuan; Yu, Yuguo; Liu, Liwei; Yu, Lianchun

    2018-04-01

    Action potentials are the information carriers of neural systems. The generation of action potentials involves the cooperative opening and closing of sodium and potassium channels. This process is metabolically expensive because the ions flowing through open channels need to be restored to maintain concentration gradients of these ions. Toxins like tetraethylammonium can block working ion channels, thus affecting the function and energy cost of neurons. In this paper, by computer simulation of the Hodgkin-Huxley neuron model, we studied the effects of channel blocking with toxins on the information transmission and energy efficiency in squid giant axons. We found that gradually blocking sodium channels will sequentially maximize the information transmission and energy efficiency of the axons, whereas moderate blocking of potassium channels will have little impact on the information transmission and will decrease the energy efficiency. Heavy blocking of potassium channels will cause self-sustained oscillation of membrane potentials. Simultaneously blocking sodium and potassium channels with the same ratio increases both information transmission and energy efficiency. Our results are in line with previous studies suggesting that information processing capacity and energy efficiency can be maximized by regulating the number of active ion channels, and this indicates a viable avenue for future experimentation.

  15. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Andrew D.; Phadke, Amol A.; Wiser, Ryan H.

    2010-06-10

    The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this paper we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33percent of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33percent RE target across nearly all scenarios analyzed (38-65percent). Solar energy is almost always the second largest source (14-41percent). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Further, we find that even with total transmission expenditures of $17-34 billion these costs still represent just 10-19percent of the total delivered cost of renewable energy.

  16. Transmission Power and Antenna Allocation for Energy-Efficient RF Energy Harvesting Networks with Massive MIMO

    Directory of Open Access Journals (Sweden)

    Yu Min Hwang

    2017-06-01

    Full Text Available The optimum transmission strategy for maximizing energy efficiency (EE of a multi-user massive multiple-input multiple-output (MIMO system in radio frequency energy harvesting networks is investigated. We focus on dynamic time-switching (TS antennas, to avoid the practical problems of power-splitting antennas, such as complex architectures, power loss and signal distortion when splitting the power of the received signal into power for information decoding (ID and energy harvesting (EH. However, since a single TS antenna cannot serve ID and EH simultaneously, the MIMO system is considered in this paper. We thus formulate an EE optimization problem and propose an iterative algorithm as a tractable solution, including an antenna selection strategy to optimally switch each TS antenna between ID mode and EH mode using nonlinear fractional programming and the Lagrange dual method. Further, the problem is solved under practical constraints of maximum transmission power and outage probabilities for a minimum amount of harvested power and rate capacity for each user. Simulation results show that the proposed algorithm is more energy-efficient than that of baseline schemes, and demonstrates the trade-off between the required amount of harvested power and energy efficiency.

  17. ANALYSIS OF ENERGY EFFICIENCY OF OPERATING MODES OF ELECTRICAL SYSTEMS WITH THE TRACTION LOADS

    Directory of Open Access Journals (Sweden)

    V. E. Bondarenko

    2017-03-01

    Full Text Available Innovative scenarios of reliable energy supply of transportation process aimed at reducing the specific energy consumption and increase energy efficiency of the systems of electric traction. The paper suggests innovative energy saving directions in traction networks of railways and new circuit solutions accessing traction substations in energy systems networks, ensure energy security of the transportation process. To ensure the energy security of rail transport special schemes were developed to propose the concept of external power traction substations, which would increase the number of connections to the networks of 220 – 330 kV, as well as the creation of transport and energy corridors, development of its own supply of electric networks of 110 kV substations and mobile RP-110 kV of next generation. Therefore, the investment program of the structures owned by the Ukrainian Railways (Ukrzaliznytsia need to be synchronized in their technological characteristics, as well as the criteria of reliability and quality of power supply with the same external energy investment programs. It is found that without any load on left or right supplying arm one of two less loaded phases of traction transformer begins generating specific modes in the supplying three-phase line. Thus, modes of mobile substation cause leakage in one of the phases of the supply line of traction transformers of active-capacitive current, and as a result generating energy in the main power line of 154 kV, which is fixed and calculated by electricity meters. For these three phase mode supply network is necessary to use 1st algorithm, i.e. taking into account the amount of electricity as the energy in all phases. For effective application of reactive power compensation devices in the AC traction power supply systems it is proposed to develop regulatory documentation on necessity of application and the order of choice of parameters and placement of compensation systems taking into

  18. Demonstration of low-energy district heating for low-energy buildings in EnergyFlexHouse. Subreport 1; Demonstration af lavenergifjernvarme til lavenergibyggeri i energyflexhouse. Delrapport 1

    Energy Technology Data Exchange (ETDEWEB)

    Holm Christiansen, C.

    2011-05-15

    This report concerns demonstration of a new concept for low temperature district heating to low energy buildings with district heating flow temperatures on just above 50 deg. C. The concept was developed in a previous energy research project under the EFP-2007-programme supported by the Danish Energy Agency. New types of prototypes for district heating consumer substations and district heating pipes in very small dimensions were developed and manufactured. Demonstration has been carried out in the Danish Technological Institute test houses 'EnergyFlexHouse' with the objective of analyzing and evaluating the performance of the concept in a real low energy house. The EnergyFlexHouse is actually two houses either each designed to be energy neutral with PV's but also fulfilling the Danish building codes low energy class 2015 requirements without the PV's. The two houses are called 'Lab' and 'Family' and are supplied with district heating from a small local distribution network. The tests are carried out in the 'Lab' house connected with a district heating branch twin pipe with two service pipes of just 10 mm inner diameter/14 mm outer diameter and with outer casing diameter of 110 mm corresponding to series 2 insulation. An accumulator consumer substation with a 175 liter storage tank on the primary side (district heating side) has been subject to tests. Tree different tapping patterns of domestic hot water were performed including tapping patterns based on the European standard PrEN50440. Generally the results show that balancing the primary loading flow in relation to actual tapping patterns and domestic hot water consumption is important in order to keep the district heating return temperature as low as possible. Based on the results different options are proposed in order to optimize the operation of the consumer substation. Recently a new project under the EUDP 2010-II has received grant to continue improving and

  19. Overview on the electric power in july 2003

    International Nuclear Information System (INIS)

    2003-01-01

    This document aims to give information on the exploitation of the transmission public network and the french electric power industry during july 2003: the internal electric power consumption in France (national consumption is the total of all the electrical energy supplied for consumption in France (including Corsica, but not the French Overseas Departments), thermal and hydro generation + imports - exports - pumping, and which have been consumed in the transmission and distribution networks, by the end-users, as well as by losses) - national consumption in July 2003 has risen by 2.5% compared with July 2002. The July average temperature, which has been 2.3 deg. C higher in 2003 than in July 2002, has resulted in consumption linked to higher use of air-conditioning and agricultural sprinklers. Adjusted for climatic effects, monthly consumption has increased by 1.5% compared with July 2002. The consumption growth rate adjusted over 12 months has fallen by 0.2% since last month, whereas the national consumption growth rate over the last 12 months has fallen by 0.1%; the energy accounting from the transmission point of view (the balance recorded by RTE takes into account only the energy physical flows conveyed on the RTE network) - in July 2003, consumption has remained stable compared with July 2002, with increased deliveries to distribution networks (+0.7 TWh) compensating for the drop in deliveries to industrial consumers (-0.1 TWh) and exports (-0.5 TWh). Injections have risen slightly (+0.2 TWh) due to the combined effects of a substantial increase in thermal generation (+0.9 TWh) and imports (+0.1 TWh), which offset the considerable fall in hydro generation (-0.8 TWh); the consumption and the physical exchanges (these values reflect all of the flows on the RTE network, as well as the generation auto-consumed by the industrial consumers connected to this network); the electric power market: the market players, contractual exchanges recorded by RTE contracts for

  20. Impact of Variable Renewable Energy on European Cross-Border Electricity Transmission

    NARCIS (Netherlands)

    Brancucci Martinez-Anido, C.; De Vries, L.J.; Fulli, G.

    2012-01-01

    The estimated growth of Europe’s electricity demand and the policy goals of mitigating climate change result in an expected increase in variable renewable energy. A high penetration of wind and solar energy will bring several new challenges to the European electricity transmission network. The

  1. Tucurui`s 500 kV S F{sub 6} gas-insulated substation modeling for fast transients - field tests comparison

    Energy Technology Data Exchange (ETDEWEB)

    Lima Filho, Joao Ferreira de; Pazo Blanco, Flavio A.F.; D` Ajuz, Ary; Nascimento, Lidio F.A. [ELETRONORTE, Brasilia, DF (Brazil)

    1994-12-31

    Many problems in insulation, devices and equipment have been resulted from switching operations in the 500 kV Gas-Insulated Substation (GIS) of Tucurui power plant. Disconnector closing or opening action can subject the GIS components to great stresses from excessive voltages at high frequencies caused by successive reflections of travelling waves at discontinuities (1,2,3). Field tests were carried out in September 18-23, 1991 to verify the actual GIS stresses at Tucurui. From these results simulations on the Alternative Transients Program (ATP) were performed in order to check the substation modeling. This paper presents and discusses the Tucurui GIS modeling for switching fast transients and its field test validation. (author) 8 refs., 6 figs.

  2. Optimisation of the high voltage substation direct lightning stroke protection system; Optimisation de systeme de protection des postes haute tension contre le coup de foudre direct

    Energy Technology Data Exchange (ETDEWEB)

    Wahab, Y.A.; Abidin, Z.Z. [Tenaga Nasional Berhad (Malaysia); Sadovic, S. [Sadovic Consultant, 92 - Asnieres (France)

    2005-04-01

    This paper presents results of the study dealing with the application of lightning rods for the substation direct stroke protection. Lightning rod locations and heights are determined using simulation software Sigma ssh. This software uses a three-dimensional Monte Carlo electro geometric modeling. Study results for one particular 275 kV and one 500 kV substation are presented. (authors)

  3. Assessment of the risk of failure of high voltage substations due to environmental conditions and pollution on insulators.

    Science.gov (United States)

    Castillo Sierra, Rafael; Oviedo-Trespalacios, Oscar; Candelo, John E; Soto, Jose D

    2015-07-01

    Pollution on electrical insulators is one of the greatest causes of failure of substations subjected to high levels of salinity and environmental pollution. Considering leakage current as the main indicator of pollution on insulators, this paper focuses on establishing the effect of the environmental conditions on the risk of failure due to pollution on insulators and determining the significant change in the magnitude of the pollution on the insulators during dry and humid periods. Hierarchical segmentation analysis was used to establish the effect of environmental conditions on the risk of failure due to pollution on insulators. The Kruskal-Wallis test was utilized to determine the significant changes in the magnitude of the pollution due to climate periods. An important result was the discovery that leakage current was more common on insulators during dry periods than humid ones. There was also a higher risk of failure due to pollution during dry periods. During the humid period, various temperatures and wind directions produced a small change in the risk of failure. As a technical result, operators of electrical substations can now identify the cause of an increase in risk of failure due to pollution in the area. The research provides a contribution towards the behaviour of the leakage current under conditions similar to those of the Colombian Caribbean coast and how they affect the risk of failure of the substation due to pollution.

  4. Fort Peck-Wolf Point transmission line project, Montana

    International Nuclear Information System (INIS)

    1992-01-01

    The primary objective of the project is to replace the existing 36-mile Fort Peck-Wolf Point transmission line which has reached the end of its useful service life. Presently, the overall condition of this existing section of the 47-year-old line is poor. Frequent repairs have been required because of the absence of overhead ground wires. The continued maintenance of the line will become more expensive and customer interruptions will persist because of the damage due to lightning. The expense of replacing shell rotted poles, and the concern for the safety of the maintenance personnel because of hazards caused by severe shell rot are also of primary importance. The operational and maintenance problems coupled with power system simulation studies, demonstrate the need for improvements to the Wolf Point area to serve area loads. Western's Wolf Point Substation is an important point of interconnection for the power output from the Fort Peck Dam to area loads as far away as Williston, North Dakota. The proposed transmission line replacement would assure that there will continue to be reliable transmission capacity available to serve area electrical loads, as well as provide a reliable second high-voltage transmission path from the Fort Peck generation to back-up a loss of the Fort Peck-Wolf Point 115-kV Line No. 1

  5. Investigation of Wave Transmission from a Floating Wave Dragon Wave Energy Converter

    DEFF Research Database (Denmark)

    Nørgaard, Jørgen Harck; Andersen, Thomas Lykke

    2012-01-01

    This paper focuses on the calibration of the MIKE21BW model against the measured wave height reduction behind a 24 kW/m Wave Dragon (WD) wave energy converter. A numerical model is used to determine the wave transmission through the floating WD in varying wave conditions. The transmission obtained...

  6. A dual energy gamma-ray transmission technique for gold alloy identification

    International Nuclear Information System (INIS)

    Sumi, Tetsuo; Shingu, Hiroyasu; Iwase, Hirotoshi

    1991-01-01

    An application of the dual energy gamma-ray transmission techniques to gold alloy identification is presented. The measurement by dual energy gamma-ray transmission is independent of thickness and density of a sample. Due to this advantage, golden accessories such as necklaces, earrings and rings can be assayed in spite of their various thicknesses and irregular sectional shapes. Choice of a gamma-ray energy pair suitable for the object is important. The authors chose 511 keV and 1275 keV gamma-rays from 22 Na. With this energy pair, R value (a ratio of mass attenuation coefficients for low and high energy gamma-rays) is predominantly related to the weight fraction of gold of the sample. Using a 370 kBq 22 Na small source and a 50 mm dia.x 50 mm thick NaI(Tl) scintillator for 1200 seconds, a resolution of 2% for the R value was obtained. This corresponds to approximately 5% of the weight fraction of gold. A better resolution can be obtained by increasing the source activity or measurement time. (author)

  7. 77 FR 30551 - Commercial Renewable Energy Transmission on the Outer Continental Shelf (OCS) Offshore Rhode...

    Science.gov (United States)

    2012-05-23

    ... transmission grid on the Rhode Island mainland to Block Island. Deepwater Wind proposes to connect an onshore... Island LLC (Deepwater Wind) Transmission System (BITS) proposal submitted to the Bureau of Ocean Energy... electrical power from Deepwater Wind's proposed 30 megawatt (MW) offshore wind energy project located in...

  8. Outage Analysis of Cooperative Transmission with Energy Harvesting Relay: Time Switching versus Power Splitting

    Directory of Open Access Journals (Sweden)

    Guanyao Du

    2015-01-01

    Full Text Available This paper investigates the multiuser transmission network with an energy harvesting (EH cooperative relay, where a source transmits independent information to multiple destinations with the help of an energy constrained relay. The relay can harvest energy from the radio frequency (RF signals transmitted from the source, and it helps the multiuser transmission only by consuming the harvested energy. By adopting the time switching and the power splitting relay receiver architectures, we firstly propose two protocols, the time switching cooperative multiuser transmission (TSCMT protocol and the power splitting cooperative multiuser transmission (PSCMT protocol, to enable the simultaneous information processing and EH at the relay for the system. To evaluate the system performance, we theoretically analyze the system outage probability for the two proposed protocols and then derive explicit expressions for each of them, respectively. Numerical results are provided to demonstrate the accuracy of our analytical results and reveal that compared with traditional noncooperative scheme our proposed protocols are green solutions to offer reliable communication and lower system outage probability without consuming additional energy. In particular, for the same transmit power at the source, the PSCMT protocol is superior to the TSCMT protocol to obtain lower system outage probability.

  9. Electric power transmission for a Hanford Nuclear Energy Center (HNEC)

    International Nuclear Information System (INIS)

    Harty, H.; Dowis, W.J.

    1983-06-01

    The original study of transmission for a Hanford Nuclear Energy Center (HNEC), which was completed in September 1975, was updated in June 1978. The present 1983 revision takes cognizance of recent changes in the electric power situation of the PNW with respect to: (1) forecasts of load growth, (2) the feasibility of early use of 1100 kV transmission, and (3) the narrowing opportunities for siting nuclear plants in the region. The purpose of this update is to explore and describe additions to the existing transmission system that would be necessary to accommodate three levels of generation at HNEC. Comparisons with a PNW system having new thermal generating capacity distributed throughout the marketing region are not made as was done in earlier versions

  10. Design of online monitoring and forecasting system for electrical equipment temperature of prefabricated substation based on WSN

    Science.gov (United States)

    Qi, Weiran; Miao, Hongxia; Miao, Xuejiao; Xiao, Xuanxuan; Yan, Kuo

    2016-10-01

    In order to ensure the safe and stable operation of the prefabricated substations, temperature sensing subsystem, temperature remote monitoring and management subsystem, forecast subsystem are designed in the paper. Wireless temperature sensing subsystem which consists of temperature sensor and MCU sends the electrical equipment temperature to the remote monitoring center by wireless sensor network. Remote monitoring center can realize the remote monitoring and prediction by monitoring and management subsystem and forecast subsystem. Real-time monitoring of power equipment temperature, history inquiry database, user management, password settings, etc., were achieved by monitoring and management subsystem. In temperature forecast subsystem, firstly, the chaos of the temperature data was verified and phase space is reconstructed. Then Support Vector Machine - Particle Swarm Optimization (SVM-PSO) was used to predict the temperature of the power equipment in prefabricated substations. The simulation results found that compared with the traditional methods SVM-PSO has higher prediction accuracy.

  11. Highly efficient solutions for smart and bulk power transmission of 'green energy'

    Energy Technology Data Exchange (ETDEWEB)

    Breuer, Wilfried; Retzmann, Dietmar; Uecker, Karl

    2010-09-15

    Environmental constraints, loss minimization and CO2 reduction will play an increasingly more important role in future. Security and sustainability of power supply as well as economic efficiency needs application of advanced technologies. Innovative solutions with HVDC (High Voltage Direct Current) and FACTS (Flexible AC Transmission Systems) have the potential to cope with these challenges. They provide the features which are necessary to avoid technical problems in power systems, they increase the transmission capacity and system stability very efficiently and help prevent cascading outages. Furthermore, they are essential for Grid Access of Renewable Energy Sources such as Hydro, Wind and Solar-Energy.

  12. The Mounting process and dielectric tests of the Parque Caballero armored substation in SF6(220 Kv); Montaje y pruebas dielectricas de la estacion blindada en gas SF6 (220 kV) 'Parque Caballero'

    Energy Technology Data Exchange (ETDEWEB)

    Decoud, Carlos; Bobadilla, Alberto [ANDE - Administracion Nacional de Electricidad, Assuncion (Paraguay)

    2001-07-01

    This document approaches the aspects referring to the mounting and also dielectric tests for the Parque Caballero armored substation in SF6. This type of installation represents a innovation regarding substations in urban centres. The most relevant items in relation to the mounting process are shown in a summarized way, as well as the aspects related to dielectric tests executed during the substation commissioning.

  13. Research on optimal investment path of transmission corridor under the global energy Internet

    Science.gov (United States)

    Huang, Yuehui; Li, Pai; Wang, Qi; Liu, Jichun; Gao, Han

    2018-02-01

    Under the background of the global energy Internet, the investment planning of transmission corridor from XinJiang to Germany is studied in this article, which passes through four countries: Kazakhstan, Russia, Belarus and Poland. Taking the specific situation of different countries into account, including the length of transmission line, unit construction cost, completion time, transmission price, state tariff, inflation rate and so on, this paper constructed a power transmission investment model. Finally, the dynamic programming method is used to simulate the example, and the optimal strategies under different objective functions are obtained.

  14. Incorporating energy efficiency into electric power transmission planning: A western United States case study

    International Nuclear Information System (INIS)

    Barbose, Galen L.; Sanstad, Alan H.; Goldman, Charles A.

    2014-01-01

    Driven by system reliability goals and the need to integrate significantly increased renewable power generation, long-range, bulk-power transmission planning processes in the United States are undergoing major changes. At the same time, energy efficiency is an increasing share of the electricity resource mix in many regions, and has become a centerpiece of many utility resource plans and state policies as a means of meeting electricity demand, complementing supply-side sources, and reducing carbon dioxide emissions from the electric power system. The paper describes an innovative project in the western United States to explicitly incorporate end-use efficiency into load forecasts – projections of electricity consumption and demand – that are a critical input into transmission planning and transmission planning studies. Institutional and regulatory background and context are reviewed, along with a detailed discussion of data sources and analytical procedures used to integrate efficiency into load forecasts. The analysis is intended as a practical example to illustrate the kinds of technical and institutional issues that must be addressed in order to incorporate energy efficiency into regional transmission planning activities. - Highlights: • Incorporating energy efficiency into electric power transmission planning is an emergent analytical and policy priority. • A new methodology for this purpose was developed and applied in the western U.S. transmission system. • Efficiency scenarios were created and incorporated into multiple load forecasts. • Aggressive deployment of efficiency policies and programs can significantly reduce projected load. • The approach is broadly applicable in long-range transmission planning

  15. Cultural-resource survey report: Hoover Dam Powerplant Modification Project II. Associated transmission-line facility

    International Nuclear Information System (INIS)

    Queen, R.L.

    1991-06-01

    The Bureau of Reclamation (Reclamation) is proposing to modify or install additional transmission facilities between the Hoover Dam hydroelectric plant and the Western Area Power Authority substation near Boulder City, Nevada. Reclamation has completed cultural resource investigations to identify historic or prehistoric resources in the project area that might be affected during construction of the transmission line. Four possible transmission corridors approximately 50 feet wide and between 9.5 and 11.5 miles long were investigated. The proposed transmission lines either parallel or replace existing transmission lines. The corridors generally have undergone significant disturbance from past transmission line construction. A Class II sampling survey covering approximately 242 acres was conducted. Access or construction roads have not been identified and surveys of these areas will have to be completed in the future. No historic or prehistoric archeological sites were encountered within the four corridor right-of-ways. It is believed that the probability for prehistoric sites is very low. Four historic period sites were recorded that are outside, but near, the proposed corridor. These sites are not individually eligible for the National Register of Historic Places, but may be associated with the construction of Hoover Dam and contribute to a historic district or multiple property resource area focusing on the dam and its construction

  16. Optimal Operation of Energy Storage in Power Transmission and Distribution

    Science.gov (United States)

    Akhavan Hejazi, Seyed Hossein

    In this thesis, we investigate optimal operation of energy storage units in power transmission and distribution grids. At transmission level, we investigate the problem where an investor-owned independently-operated energy storage system seeks to offer energy and ancillary services in the day-ahead and real-time markets. We specifically consider the case where a significant portion of the power generated in the grid is from renewable energy resources and there exists significant uncertainty in system operation. In this regard, we formulate a stochastic programming framework to choose optimal energy and reserve bids for the storage units that takes into account the fluctuating nature of the market prices due to the randomness in the renewable power generation availability. At distribution level, we develop a comprehensive data set to model various stochastic factors on power distribution networks, with focus on networks that have high penetration of electric vehicle charging load and distributed renewable generation. Furthermore, we develop a data-driven stochastic model for energy storage operation at distribution level, where the distribution of nodal voltage and line power flow are modelled as stochastic functions of the energy storage unit's charge and discharge schedules. In particular, we develop new closed-form stochastic models for such key operational parameters in the system. Our approach is analytical and allows formulating tractable optimization problems. Yet, it does not involve any restricting assumption on the distribution of random parameters, hence, it results in accurate modeling of uncertainties. By considering the specific characteristics of random variables, such as their statistical dependencies and often irregularly-shaped probability distributions, we propose a non-parametric chance-constrained optimization approach to operate and plan energy storage units in power distribution girds. In the proposed stochastic optimization, we consider

  17. A leader-followers model of transmission augmentation for considering strategic behaviours of generating companies in energy markets

    International Nuclear Information System (INIS)

    Hesamzadeh, M.R.; Hosseinzadeh, N.; Wolfs, P.J.

    2010-01-01

    This paper suggests an integrated mathematical framework developed based on the leader-followers game for augmentation of transmission networks. Transmission Network Service Provider moves first and designs the horizon year transmission system. Generating Companies compete for having the highest share from the energy market and they find their equilibrium point using the Nash equilibrium concept. Finally, Market Management Company receives the planning schedule of transmission system and the energy offer prices and clears the market. In addition to the exact mathematical modelling of the interested players of transmission planning problem, the methodology can design the future transmission system not only for improving the system social welfare but also for encouraging competition among horizon year generating companies. (author)

  18. Space power transmission

    Energy Technology Data Exchange (ETDEWEB)

    Kuribayashi, Shizuma [Mitsubishi Heavy Industries, Ltd., Tokyo, (Japan)

    1989-10-05

    There being a conception to utilize solar energy by use of a space power station (SPS), a method to bring that universal grace to mankind is wireless energy transmission. The wireless energy transmission is regarded to be microwave transmission or laser beam transmission. The microwave transmission is to transmit 2.45GHz band microwave from the SPS to a receiving station on the ground to meet power demand on earth. The microwave, as small in attenuation in atmosphere and resistant against rain and cloud, is made candidate and, however, problematic in influence on organism, necessary large area of receiving antenna and many other points to be studied. While the laser transmission, as more convergent of beam than the microwave transmission, is advantageous with enabling the receiving area to be small and, however, disadvantageous with being not resistant against dust, rain and cloud, if used for the energy transmission between the space and earth. 2 refs., 2 figs.

  19. Electric power industry in China

    Energy Technology Data Exchange (ETDEWEB)

    Zisheng Jiang [Ministry of Electric Power, Beijing (China). Bureau of Electric Power Machinery

    1995-07-01

    This document presents the status of the electric power in China, highlighting the following aspects: recent achievement, electricity increased sharing in the total energy consumption, technical economic indexes, nuclear power, renewable energy sources, rural electrification, transmission and power network, transmission lines and substations, present status and development trends for power network, regulation of power system dispatching, power system communication. The document also presents the future developing plan, approaching the outlook and strategy, development targets of the electric power industry and the administrative system reforming of the electric power industry.

  20. Improving the performance of subtransmission through substation reinforcement; Melhoria do desempenho de sistemas de subtransmissao atraves de reforcos em substacoes

    Energy Technology Data Exchange (ETDEWEB)

    Paiva Mendes, Dilcemar de [Ceara Univ., Fortaleza, CE (Brazil); Melo, Albert Cordeiro Geber de [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Pereira, Jose Luiz Rezende [Juiz de Fora Univ., MG (Brazil)

    1994-12-31

    This work presents an approach to the global reliability improve of power subtransmission systems through of reinforcements in critical components of the power substations. (author) 13 refs., 3 figs., 3 tabs.

  1. UHV A.C. transmission: Technology and prospects

    International Nuclear Information System (INIS)

    Cauzillo, B.A.; Manzoni, G.; Nicolini, P.

    1992-04-01

    At the beginning of the 70's, UHV transmission was regarded as imminent in many countries in view of the expected concentration of generating units (possibly of the nuclear type and grouped together in a few large plants, each of several GW), and research projects were therefore launched in the U.S.A., Canada, Italy, Japan, USSR, etc. Nowadays, the expected introduction of UHV transmission seems remote due to the slowdown in electricity growth and to the tendency towards distributed generation. Nevertheless, there are exceptions: the 1,200 kV 2,400 km-long transmission system in operation in Siberia-Kazahkstan-Urals, and the 1,100 kV 200 km double-circuit line under construction in Japan (which will, however, be operated at 500 kV up to the end of the century). In addition, in Italy, the research programme of a 1000 kV project has now been completed and a 1,050 kV pilot plant is under construction in Tuscany, consisting of a short 1,050kV line and a 420/1,050 kV 1,200 MVA substation. The technology of UHV AC transmission has therefore been proved effective and may represent an available option for the power systems of the next century. From the power system planning point-of-view, UHV's favourable characteristics lie in the possibility of transmitting large amount of power, of the order of 5 GW per circuit, with lower costs, reduced losses, and less land occupation than in the case of EHV lines

  2. Magnetic substate populations of product nuclei in the /sup 11/B(d,p)/sup 12/B reaction. [1. 3 to 3. 0 MeV, j mixings and alignment

    Energy Technology Data Exchange (ETDEWEB)

    Tanaka, M; Ochi, S; Minamisono, T; Mizobuchi, A; Sugimoto, K

    1976-01-01

    Magnetic substate populations of product nuclei in the /sup 11/B(d,p)/sup 112/B reaction were measured in an energy range E/sub d/ = 1.3 to 3.0 MeV at recoil angles around theta/sub R/ = 55, 45, and 27 to 37/sup 0/. The alignment of the first excited state of /sup 12/B was determined. A comparison of the present result with theoretical predictions is given, together with the resultant information about j mixings in the /sup 12/B states. (auth)

  3. 76 FR 6493 - Notice of Intent to Prepare an Environmental Impact Statement for the Proposed K Road/Moapa Band...

    Science.gov (United States)

    2011-02-04

    ... Impact Statement for the Proposed K Road/Moapa Band of Paiute Indians Photovoltaic Solar Facility, Clark... U.S.C. 415, is the BIA approval of a solar energy ground lease and associated agreements entered... proposed solar generation facility to an existing substation on a transmission line with a rating up to 500...

  4. Energy-water analysis of the 10-year WECC transmission planning study cases.

    Energy Technology Data Exchange (ETDEWEB)

    Tidwell, Vincent Carroll; Passell, Howard David; Castillo, Cesar; Moreland, Barbara

    2011-11-01

    In 2011 the Department of Energy's Office of Electricity embarked on a comprehensive program to assist our Nation's three primary electric interconnections with long term transmission planning. Given the growing concern over water resources in the western U.S. the Western Electricity Coordinating Council (WECC) requested assistance with integrating water resource considerations into their broader electric transmission planning. The result is a project with three overarching objectives: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western Interconnection to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Western States Water Council (WSWC) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and WSWC. The foundation for the Energy-Water DSS is Sandia National Laboratories Energy-Power-Water Simulation (EPWSim) model (Tidwell et al. 2009). The modeling framework targets the shared needs of energy and water producers, resource managers, regulators, and decision makers at the federal, state and local levels. This framework provides an interactive environment to explore trade-offs, and 'best' alternatives among a broad list of energy/water options and objectives. The decision support framework is formulated in a modular architecture, facilitating tailored analyses over different geographical regions and scales (e.g., state, county, watershed, interconnection). An interactive interface allows direct control of the model and access to real-time results displayed as charts, graphs and maps. The framework currently supports

  5. Natural gas transmission and distribution model of the National Energy Modeling System

    International Nuclear Information System (INIS)

    1997-02-01

    The Natural Gas Transmission and Distribution Model (NGTDM) is the component of the National Energy Modeling System (NEMS) that is used to represent the domestic natural gas transmission and distribution system. NEMS was developed in the Office of Integrated Analysis and Forecasting of the Energy Information Administration (EIA). NEMS is the third in a series of computer-based, midterm energy modeling systems used since 1974 by the EIA and its predecessor, the Federal Energy Administration, to analyze domestic energy-economy markets and develop projections. From 1982 through 1993, the Intermediate Future Forecasting System (IFFS) was used by the EIA for its analyses, and the Gas Analysis Modeling System (GAMS) was used within IFFS to represent natural gas markets. Prior to 1982, the Midterm Energy Forecasting System (MEFS), also referred to as the Project Independence Evaluation System (PIES), was employed. NEMS was developed to enhance and update EIA's modeling capability by internally incorporating models of energy markets that had previously been analyzed off-line. In addition, greater structural detail in NEMS permits the analysis of a broader range of energy issues. The time horizon of NEMS is the midterm period (i.e., through 2015). In order to represent the regional differences in energy markets, the component models of NEMS function at regional levels appropriate for the markets represented, with subsequent aggregation/disaggregation to the Census Division level for reporting purposes

  6. Natural gas transmission and distribution model of the National Energy Modeling System

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    The Natural Gas Transmission and Distribution Model (NGTDM) is the component of the National Energy Modeling System (NEMS) that is used to represent the domestic natural gas transmission and distribution system. NEMS was developed in the Office of Integrated Analysis and Forecasting of the Energy Information Administration (EIA). NEMS is the third in a series of computer-based, midterm energy modeling systems used since 1974 by the EIA and its predecessor, the Federal Energy Administration, to analyze domestic energy-economy markets and develop projections. From 1982 through 1993, the Intermediate Future Forecasting System (IFFS) was used by the EIA for its analyses, and the Gas Analysis Modeling System (GAMS) was used within IFFS to represent natural gas markets. Prior to 1982, the Midterm Energy Forecasting System (MEFS), also referred to as the Project Independence Evaluation System (PIES), was employed. NEMS was developed to enhance and update EIA`s modeling capability by internally incorporating models of energy markets that had previously been analyzed off-line. In addition, greater structural detail in NEMS permits the analysis of a broader range of energy issues. The time horizon of NEMS is the midterm period (i.e., through 2015). In order to represent the regional differences in energy markets, the component models of NEMS function at regional levels appropriate for the markets represented, with subsequent aggregation/disaggregation to the Census Division level for reporting purposes.

  7. Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-01

    This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

  8. Marginal cost calculation of energy production in hydro thermoelectric systems considering the transmission system

    International Nuclear Information System (INIS)

    Pereira, M.V.F.; Gorenstin, B.G.; Alvarenga Filho, S.

    1989-01-01

    The alternatives for calculation of energy marginal cost in hydroelectric systems, considering the transmission one, was analysed, including fundamental concepts; generation/transmission systems, represented by linear power flow model; production marginal costs in hydrothermal systems and computation aspects. (C.G.C.). 11 refs, 5 figs

  9. Wireless Energy and Information Transmission in FSO and RF-FSO Links

    KAUST Repository

    Makki, Behrooz; Svensson, Tommy; Buisman, Koen; Perez, Joaquin; Alouini, Mohamed-Slim

    2017-01-01

    We propose and analyze a wireless energy and information transmission scheme in free-space optical (FSO) links. The results are presented for both quasi-static and fast-fading conditions. We derive closed-form expressions for throughput, outage

  10. Overview of electrical energy in may 2003

    International Nuclear Information System (INIS)

    2003-01-01

    This document aims to give information on the exploitation of the transmission public network and the french electric power industry during may 2003: the internal electric power consumption in France (national consumption is the total of all the electrical energy supplied for consumption in France (including Corsica, but not the French Overseas Departments), thermal and hydro generation + imports - exports - pumping, and which have been consumed in the transmission and distribution networks, by the end-users, as well as by losses) - May 2003 gross consumption is 1.4% lower compared to May 2002. This is due to a 1.3 deg. C rise this year in May average temperature. However, the monthly consumption is 0.9% higher than May 2002 consumption if climatic effects are put aside. The growth rate of the corrected consumption over the last 12 months shows a rise of 0.2% from last month, whereas the growth rate of gross consumption over the last 12 months shows a decrease of 0.2% compared to April 2002; the energy accounting from the transmission point of view (The balance recorded by RTE takes into account only the energy physical flows conveyed on the RTE network) - on May 2003, consumption has fallen compared to May 2002, as did exports (-0.9 TWh). Consequently the global volume of injections shows a loss of 1.2 TWh. Compared to May 2002, thermal generation and hydroelectric generation have respectively lost 1.1 TWh and 0.3 TWh. Imports are roughly 0.2 TWh up; the consumption and the physical exchanges (these values reflect all the flows on the RTE network, as well as the generation auto-consumed by the industrial consumers connected to this network); the electric power market: the market players, contractual exchanges recorded by RTE contracts for access to international connections, contractual exchanges by border; and the evolution of the transmission network: on May 2003 the 4.3 km-long 225 kV Bouscat-Bruges underground link has come into service on the RTE system

  11. Calculation and application of energy transaction allocation factors in electric power transmission systems

    Science.gov (United States)

    Fradi, Aniss

    The ability to allocate the active power (MW) loading on transmission lines and transformers, is the basis of the "flow based" transmission allocation system developed by the North American Electric Reliability Council. In such a system, the active power flows must be allocated to each line or transformer in proportion to the active power being transmitted by each transaction imposed on the system. Currently, this is accomplished through the use of the linear Power Transfer Distribution Factors (PTDFs). Unfortunately, no linear allocation models exist for other energy transmission quantities, such as MW and MVAR losses, MVAR and MVA flows, etc. Early allocation schemes were developed to allocate MW losses due to transactions to branches in a transmission system, however they exhibited diminished accuracy, since most of them are based on linear power flow modeling of the transmission system. This thesis presents a new methodology to calculate Energy Transaction Allocation factors (ETA factors, or eta factors), using the well-known process of integration of a first derivative function, as well as consistent and well-established mathematical and AC power flow models. The factors give a highly accurate allocation of any non-linear system quantity to transactions placed on the transmission system. The thesis also extends the new ETA factors calculation procedure to restructure a new economic dispatch scheme where multiple sets of generators are economically dispatched to meet their corresponding load and their share of the losses.

  12. Scheme of substations: circuit breakers topology; El esquema de S.E.: interruptor y medio y algunas variantes del mismo, a la luz de la gestion privada de instalaciones de servicio publico

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, Maximo B. [Sade Skanska S.A. (Argentina)

    2001-07-01

    This work approaches a topological scheme applicable for the entrance circuit breakers which are used in high voltage substations and also in substations from the rated voltage class of 115 Kv by many countries. It is a safe scheme due to providing a double connection for the feeder cables and more economical than the double circuit breakers option. Nevertheless, the scheme has some restrictions as follows: a) The premises of continuity are not accomplished in small substations b) It is possible to occur a responsibility conflict in relation to the main circuit breaker. In the private administration of public service facilities multiples jurisdictions can appear which require well defined limits, and the penalties due to outages can be minimized.

  13. Planning Electric Transmission Lines: A Review of Recent Regional Transmission Plans

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-04-13

    The first Quadrennial Energy Review (QER) recommends that the U.S. Department of Energy (DOE) conduct a national review of transmission plans and assess the barriers and incentives to their implementation. DOE tasked Lawrence Berkeley National Laboratory (LBNL) to prepare two reports to support the agency’s response to this recommendation. This report reviews regional transmission plans and regional transmission planning processes that have been directed by Federal Energy Regulatory Commission (FERC) Order Nos. 890 and 1000. We focus on the most recent regional transmission plans (those issued in 2015 and through approximately mid-year 2016) and current regional transmission planning processes. A companion report focuses on non-plan-related factors that affect transmission projects.

  14. Flatiron-Erie 115kV transmission line project, Larimer, Weld and Boulder Counties, Colorado

    International Nuclear Information System (INIS)

    1993-05-01

    Western Area Power Administration (Western) proposes to uprate its existing 115-kV Flatiron-Erie transmission line. The line is located in Larimer, Weld and Boulder Counties, Colorado, and passes through the City of Longmont. The line connects Flatiron Substation and several of the substations supplying Longmont. It is a single circuit 115-kV line, 31.5 miles long, and was built in 1950-51 on a 75-foot wide right-of-way (ROW) using wood H-frame structures. Western proposes to build 27 new structures along the line, to replace or modify 45 of the existing structures and to remote 11 of them. Many of these additions and changes would involve structures that are approximately 5 to 15 feet taller than the existing ones. The existing conductors and ground wires would remain in place. The purpose of these actions would be to allow the power carrying capability of the line to be increased and to replace deteriorating/structural members. Western would be the sole participant in the proposed project. This report gives an analysis of the study area environment and the development of alternative routes. An assessment is presented of the impacts of the primary alternative routes. The environmental consequences of this project are addressed

  15. Nationwide impact and vehicle to grid application of electric vehicles mobility using an activity based model

    OpenAIRE

    Álvaro, Roberto; González, Jairo; Fraile Ardanuy, José Jesús; Knapen, Luk; Janssens, Davy

    2013-01-01

    This paper describes the impact of electric mobility on the transmission grid in Flanders region (Belgium), using a micro-simulation activity based models. These models are used to provide temporal and spatial estimation of energy and power demanded by electric vehicles (EVs) in different mobility zones. The increment in the load demand due to electric mobility is added to the background load demand in these mobility areas and the effects over the transmission substations are analyzed. From t...

  16. HTGR molten salt sensible energy transmission and storage system design and costs

    International Nuclear Information System (INIS)

    1981-09-01

    This report, which was prepared for Gas-Cooled Reactor Associates by United Engineers and Constructors under Contract No. GCRA/UE and C 81-203, presents the design and cost for a molten salt Sensible Energy Transmission and Storage (SETS) System. Although the reference system for this study is sized to be compatible with an 1170 MW(t) HTGR Nuclear Heat Source, the results and conclusions should be generally applicable to most large scale molten salt energy transmission system applications. A preliminary conceptual design is presented and alternative configurations are discussed. The sensitivity of system costs to variations in important system parameters are also presented. Costs for a reference case conceptual design are reported in constant 1980 dollars and inflated 1995 dollars

  17. 75 FR 51990 - CenterPoint Energy-Illinois Gas Transmission Company; Notice of Baseline Filing

    Science.gov (United States)

    2010-08-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10-80-000] CenterPoint Energy--Illinois Gas Transmission Company; Notice of Baseline Filing August 17, 2010. Take notice that on August 12, 2010, the applicant listed above submitted their baseline filing of its Statement of Operating...

  18. Beacon-S TM: Non-uniform attenuation correction for SPECT imaging. The new medium-energy transmission device for AXIS and IRIX

    International Nuclear Information System (INIS)

    Daniel Gagnon, D.

    1999-01-01

    The paper presents new medium-energy transmission device for SPECT imaging. Beacon-S includes a 356-keV medium energy 133 Ba source with a 10.54-year half-life. Beacon-S provide high-resolution and high-contrast transmission scans. The higher energy of the gamma substantially improves the transmission contrast for larger patients by virtue of better penetration through the body

  19. SF6 gas insulated power substations. Effects of fast transients (VFT) on the equipment and adjacent equipment of the Itaipu Binacional SF6 insulated power substations; Subestaciones aisladas a gas SF6. Efectos de los transitorios rapidos (VFT's) sobre equipos y equipos adyacentes de las SE's SF6 de Itaipu Binacional

    Energy Technology Data Exchange (ETDEWEB)

    Santacruz Martinez, Miguel [Usina Hidroelectrica de Itaipu, Assuncao (Paraguay)]. E-mail: santcruz@itaipu.gov.py

    2001-07-01

    With the operation starting of the S F6 gas substations in high voltage systems occurs a new form of overvoltage presently known as Very Fast Transients. This paper aims the phenomenon characterization, defining the origins and the behaviour of the electric systems, and briefly presents the damages caused by the phenomenon on the equipment and adjacent equipment of S F6 gas insulated substations of the Itaipu Binacional, mainly on the power transformers and oil/S F6 isolators of the step-up transformers. These equipment was modified or are been modified as a consequence of the this overvoltage effects.

  20. Optical fiber configurations for transmission of laser energy over great distances

    Science.gov (United States)

    Rinzler, Charles C; Zediker, Mark S

    2013-10-29

    There are provided optical fiber configurations that provide for the delivery of laser energy, and in particular, the transmission and delivery of high power laser energy over great distances. These configurations further are hardened to protect the optical fibers from the stresses and conditions of an intended application. The configurations provide means for determining the additional fiber length (AFL) need to obtain the benefits of such additional fiber, while avoiding bending losses.

  1. Improving the Transmission System Reliability for the 154kV Radial Network Operation

    Energy Technology Data Exchange (ETDEWEB)

    Choo, Jin Boo; Yoo, Myeong Ho; Yoon, Young Beum; Kim, Tae Won [Korea Electric Power Research Institute, Taejon (Korea, Republic of); Lee, Gi Won; Chung, Beom Jin; Jung, Jung Won; Park, Kyu Hyun; Lee, Myung Hee; Kim, Hyun Jong; Kim, Chae Hee [KEYIN CO., (Korea, Republic of)

    1996-12-31

    Analyzing that 154kV radial network current ed operated, we developed Automatic Power Reconfiguration System(APRS) which restore blackout area. It consists of special data acquisition system(DAU) and central monitoring system for reason of protecting currently operating power system. In addition, it communicates using optical communication network for high speed data transmission and accuracy. An Accuracy of operation and stability of the developed system is tested using Real Time Digital Simulator in 3-bus equivalent model system. In An Outage case, our developed system can restore a blackout area in three second. An ability of the restoration of a blackout was verified by simulations. For the field test, the developed system was set up at SINCHON S/S, SESOMUN S/S, SINDANG S/S and MAJANG S/S governed by Seoul Power Transmission Center. If the system reliability is proved for a one year test in real power system, application of the system will be extended to the other substations.

  2. Energy transmission through a double-wall curved stiffened panel using Green's theorem

    Science.gov (United States)

    Ghosh, Subha; Bhattacharya, Partha

    2015-04-01

    It is a common practice in aerospace and automobile industries to use double wall panels as fuselage skins or in window panels to improve acoustic insulation. However, the scientific community is yet to develop a reliable prediction method for a suitable vibro-acoustic model for sound transmission through a curved double-wall panel. In this quest, the present work tries to delve into the modeling of energy transmission through a double-wall curved panel. Subsequently the radiation of sound power into the free field from the curved panel in the low to mid frequency range is also studied. In the developed model to simulate a stiffened aircraft fuselage configuration, the outer wall is provided with longitudinal stiffeners. A modal expansion theory based on Green's theorem is implemented to model the energy transmission through an acoustically coupled double-wall curved panel. An elemental radiator approach is implemented to calculate the radiated energy from the curved surface in to the free field. The developed model is first validated with various numerical models available. It has been observed in the present study that the radius of curvature of the surface has a prominent effect on the behavior of radiated sound power into the free field. Effect of the thickness of the air gap between the two curved surfaces on the sound power radiation has also been noted.

  3. Superconducting magnetic energy storage (SMES) program. Progress report, January 1-December 31, 1982

    International Nuclear Information System (INIS)

    Rogers, J.D.

    1983-05-01

    Work reported is on the development of a 30 MJ superconducting magnetic energy storage (SMES) unit, its installation at the Bonneville Power Administration (BPA) Tacoma Substation, and the preliminary site tests in preparation for its use to stabilize power oscillations on the BPA Pacific AC Inertie. The seismic mounting of the 30 MJ superconducting coil to the dewar lid was completed. The manufacture and testing of the nonconducting dewar were completed. The 5 kV vapor cooled leads were assembled and tested. The refrigerator was placed in operation at the Tacoma Substation and tested by making liquid helium in a 500 l dewar. The refrigerator was connected to the coil dewar and is now used for cooling the 30 MJ coil and dewar with extended purification of the circulating helium to remove contaminants. All equipment was shipped and installed at the BPA Tacoma Substation. Assembly of the 30 MJ coil into the nonconducting dewar was done at the BPA Covington facility and transported to the Tacoma Substation. Substation preparation was completed by 11-1-82. BPA, at considerable expense, did an excellent job preparing the site and assisting with the SMES unit installation. All equipment is in place and operable except for components of the computer control and for full refrigeration of the 30 MJ coil. The converter was tested with the output shorted with the input transformers connected to the 13.8 kV. A new schedule for the SMES operation was established

  4. Experimental observation on asymmetric energy flux within the forbidden frequency band in the LC transmission line

    International Nuclear Information System (INIS)

    Tao Feng; Chen Weizhong; Pan Junting; Xu Wen; Du Sidan

    2012-01-01

    We study the energy flux in a nonlinear electrical transmission line consisting of two coupled segments which are identical in structure and different in parameters. The asymmetry of energy flux caused by nonlinear wave has been observed experimentally in the forbidden band of the line. The experiment shows whether the energy can flow through the transmission line depends on the amplitude of the boundary driving voltages, which can be well explained in the theoretical framework of nonlinear supratransmission. The numerical simulation based on Kirchhoff’s laws further verifies the existence of the asymmetric energy flux in the forbidden band.

  5. 76 FR 49762 - FirstEnergy Service Co. v. Midwest Independent Transmission System Operator, Inc.; Notice of...

    Science.gov (United States)

    2011-08-11

    ... declaratory order asking that the Commission declare that Multi-Value Project (MVP) transmission usage charges... unreasonable to apply MVP transmission usage charges to FirstEnergy or its customers migrated from the Midwest...

  6. Energy conversion and management principles and applications

    CERN Document Server

    Petrecca, Giovanni

    2014-01-01

    This book provides an overall view of energy conversion and management in industry and in buildings by following the streams of energy from the site boundaries to the end users. Written for an audience of both practitioners and faculty/students, Energy Conversion and Management: Principles and Applications presents general principles of energy conversion and energy sources, both traditional and renewable, in a broad range of facilities such as electrical substations, boiler plants, heat and power plants, electrical networks, thermal fluid distributions lines and insulations, pumps and fans, ai

  7. 78 FR 50026 - Basin Electric Power Cooperative, Inc.: Notice of Intent To Prepare a Supplemental Draft...

    Science.gov (United States)

    2013-08-16

    ... transmission lines, 5 new substations, modifications to 4 existing substations, maintenance access roads... address the construction, operation, and maintenance of Basin Electric's proposed Project. The Project includes construction, operation and maintenance of approximately 275 [[Page 50027

  8. Simulator for training operators of electric substation: an approach via RBC-Paraconsistent; Simulador para treinamento de operadores de subestacao eletrica: um enfoque via RBC-paraconsistente

    Energy Technology Data Exchange (ETDEWEB)

    Lambert-Torres, G.; Martins, H.G.; Coutinho, M.P.; Goulart, J.D.C.; Soares, F.M.A. [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Dept. de Engenharia Eletrica], Emails: germanoltorres@gmail.com, helgagonzaga@gmail.com, maurilio.coutinho@gmail.com, janaina157@yahoo.com.br, francis.azevedo@gmail.com

    2009-07-01

    This article presents a combination of two techniques applied artificial intelligence to solve problems to Restoration of an Electric Substation: Casebased Reasoning - CBR and the Four Values Annotated Paraconsistent Logic - 4vAPL. The process occurs in the connection functions of belief, disbelief, specialty and temporality to LPA4v in the retrieval of cases to determine process diagnostic of an RBC. The field of CBR is applied in a recovery of an electric substation. The LPA4v is the support applied in problems that have inconsistent information, partials and undefined. Thus this study is closer of the real situations.

  9. eV-TEM: Transmission electron microscopy in a low energy cathode lens instrument

    Energy Technology Data Exchange (ETDEWEB)

    Geelen, Daniël, E-mail: geelen@physics.leidenuniv.nl [Huygens-Kamerlingh Onnes Laboratory, Leiden Institute of Physics, Leiden University, P.O. Box 9504, 2300 RA Leiden (Netherlands); Thete, Aniket [Huygens-Kamerlingh Onnes Laboratory, Leiden Institute of Physics, Leiden University, P.O. Box 9504, 2300 RA Leiden (Netherlands); Schaff, Oliver; Kaiser, Alexander [SPECS GmbH, Voltastrasse 5, D-13355 Berlin (Germany); Molen, Sense Jan van der [Huygens-Kamerlingh Onnes Laboratory, Leiden Institute of Physics, Leiden University, P.O. Box 9504, 2300 RA Leiden (Netherlands); Tromp, Rudolf [IBM T.J. Watson Research Center, 1101 Kitchawan Road, P.O. Box 218, Yorktown Heights, NY 10598 (United States)

    2015-12-15

    We are developing a transmission electron microscope that operates at extremely low electron energies, 0–40 eV. We call this technique eV-TEM. Its feasibility is based on the fact that at very low electron energies the number of energy loss pathways decreases. Hence, the electron inelastic mean free path increases dramatically. eV-TEM will enable us to study elastic and inelastic interactions of electrons with thin samples. With the recent development of aberration correction in cathode lens instruments, a spatial resolution of a few nm appears within range, even for these very low electron energies. Such resolution will be highly relevant to study biological samples such as proteins and cell membranes. The low electron energies minimize adverse effects due to radiation damage. - Highlights: • We present a new way of performing low energy transmission electron microscopy in an aberration corrected LEEM/PEEM instrument. • We show a proof of principle where we measure transmitted electrons through a suspended graphene monolayer with a preliminary setup. • We present an improved setup design that provides better control of the incident electron beam.

  10. Study on the application of energy storage system in offshore wind turbine with hydraulic transmission

    International Nuclear Information System (INIS)

    Fan, Yajun; Mu, Anle; Ma, Tao

    2016-01-01

    Highlights: • Hydraulic offshore wind turbine is capable of outputting near constant power. • Open loop hydraulic transmission uses seawater as the working fluid. • Linear control strategy distributes total flow according to demand and supply. • Constant pressure hydraulic accumulator stores/releases the surplus energy. • Simulations show the dynamic performance of the hybrid system. - Abstract: A novel offshore wind turbine comprising fluid power transmission and energy storage system is proposed. In this wind turbine, the conventional mechanical transmission is replaced by an open-loop hydraulic system, in which seawater is sucked through a variable displacement pump in nacelle connected directly with the rotor and utilized to drive a Pelton turbine installed on the floating platform. Aiming to smooth and stabilize the output power, an energy storage system with the capability of flexible charging and discharging is applied. The related mathematical model is developed, which contains some sub-models that are categorized as the wind turbine rotor, hydraulic pump, transmission pipeline, proportional valve, accumulator and hydraulic turbine. A linear control strategy is adopted to distribute the flow out of the proportional valve through comparing the demand power with captured wind energy by hydraulic pump. Ultimately, two time domain simulations demonstrate the operation of the hybrid system when the hydraulic accumulator is utilized and show how this system can be used for load leveling and stabilizing the output power.

  11. A stable wireless energy transmission system for gastrointestinal microsystems.

    Science.gov (United States)

    Xin, W H; Yan, G Z; Wang, W X

    2010-01-01

    A wireless energy transmission system using a Helmholtz primary coil outside and a 3-dimensional secondary coil inside the body is introduced. It is designed to transmit stable power to a gastrointestinal microsystem regardless of its position and orientation when working in the gastric tract. Up to 310 mW of usable DC power can be delivered under worst-case geometrical conditions. Measured data of the system performance are presented and evaluated.

  12. Joint Planning Of Energy Storage and Transmission Considering Wind-Storage Combined System and Demand Side Response

    Science.gov (United States)

    Huang, Y.; Liu, B. Z.; Wang, K. Y.; Ai, X.

    2017-12-01

    In response to the new requirements of the operation mode of wind-storage combined system and demand side response for transmission network planning, this paper presents a joint planning of energy storage and transmission considering wind-storage combined system and demand side response. Firstly, the charge-discharge strategy of energy storage system equipped at the outlet of wind farm and demand side response strategy are analysed to achieve the best comprehensive benefits through the coordination of the two. Secondly, in the general transmission network planning model with wind power, both energy storage cost and demand side response cost are added to the objective function. Not only energy storage operation constraints and but also demand side response constraints are introduced into the constraint condition. Based on the classical formulation of TEP, a new formulation is developed considering the simultaneous addition of the charge-discharge strategy of energy storage system equipped at the outlet of the wind farm and demand side response strategy, which belongs to a typical mixed integer linear programming model that can be solved by mature optimization software. The case study based on the Garver-6 bus system shows that the validity of the proposed model is verified by comparison with general transmission network planning model. Furthermore, the results demonstrate that the joint planning model can gain more economic benefits through setting up different cases.

  13. A Comparative Study of Electric Load Curve Changes in an Urban Low-Voltage Substation in Spain during the Economic Crisis (2008–2013)

    Science.gov (United States)

    Lara-Santillán, Pedro M.; Mendoza-Villena, Montserrat; Fernández-Jiménez, L. Alfredo; Mañana-Canteli, Mario

    2014-01-01

    This paper presents a comparative study of the electricity consumption (EC) in an urban low-voltage substation before and during the economic crisis (2008–2013). This low-voltage substation supplies electric power to near 400 users. The EC was measured for an 11-year period (2002–2012) with a sampling time of 1 minute. The study described in the paper consists of detecting the changes produced in the load curves of this substation along the time due to changes in the behaviour of consumers. The EC was compared using representative curves per time period (precrisis and crisis). These representative curves were obtained after a computational process, which was based on a search for days with similar curves to the curve of a determined (base) date. This similitude was assessed by the proximity on the calendar, day of the week, daylight time, and outdoor temperature. The last selection parameter was the error between the nearest neighbour curves and the base date curve. The obtained representative curves were linearized to determine changes in their structure (maximum and minimum consumption values, duration of the daily time slot, etc.). The results primarily indicate an increase in the EC in the night slot during the summer months in the crisis period. PMID:24895677

  14. A Comparative Study of Electric Load Curve Changes in an Urban Low-Voltage Substation in Spain during the Economic Crisis (2008–2013

    Directory of Open Access Journals (Sweden)

    Pedro M. Lara-Santillán

    2014-01-01

    Full Text Available This paper presents a comparative study of the electricity consumption (EC in an urban low-voltage substation before and during the economic crisis (2008–2013. This low-voltage substation supplies electric power to near 400 users. The EC was measured for an 11-year period (2002–2012 with a sampling time of 1 minute. The study described in the paper consists of detecting the changes produced in the load curves of this substation along the time due to changes in the behaviour of consumers. The EC was compared using representative curves per time period (precrisis and crisis. These representative curves were obtained after a computational process, which was based on a search for days with similar curves to the curve of a determined (base date. This similitude was assessed by the proximity on the calendar, day of the week, daylight time, and outdoor temperature. The last selection parameter was the error between the nearest neighbour curves and the base date curve. The obtained representative curves were linearized to determine changes in their structure (maximum and minimum consumption values, duration of the daily time slot, etc.. The results primarily indicate an increase in the EC in the night slot during the summer months in the crisis period.

  15. Highly efficient solutions for smart and bulk power transmission of 'green energy'

    Energy Technology Data Exchange (ETDEWEB)

    Breuer, Wilfried; Retzmann, Dietmar; Uecker, Karl

    2010-09-15

    Environmental constraints, loss minimization and CO2 reduction will play an increasingly more important role in future. Security and sustainability of power supply as well as economic efficiency needs application of advanced technologies. Innovative solutions with HVDC (High Voltage Direct Current) and FACTS (Flexible AC Transmission Systems) have the potential to cope with these challenges. They provide the features which are necessary to avoid technical problems in power systems, they increase the transmission capacity and system stability very efficiently and help prevent cascading outages. Furthermore, they are essential for Grid Access of Renewable Energy Sources such as Hydro, Wind and Solar-Energy.

  16. Mortality of persons resident in the vicinity of electricity transmission facilities

    Energy Technology Data Exchange (ETDEWEB)

    McDowall, M E

    1986-02-01

    Several studies have raised the possibility that exposure to electrical and/or magnetic fields may be injurious to health in particular by the promotion or initiation of cancer. To investigate whether the electricity transmission system presents a long term hazard to public health, the mortality of nearly 8,000 persons, identified as living in the vicinity of electrical transmission facilities at the time of the 1971 Population Census, has been followed to the end of 1983. All identified transmission installations within pre-defined areas were included in the study with the result that the greater part of the study group were believed to be resident near relatively low voltage sub-stations. Overall mortality was lower than expected and no evidence of major health hazards emerged. The only statistically significant excess mortality was for lung cancer (in women overall, and in persons living closest to the installations); this result is difficult to interpret in the absence of smoking data, and is not supported by other evidence but does not appear to be due to the social class distribution of the study group. The study did not support previously reported associations of exposure to electro-magnetic fields with acute myeloid leukaemia, other lymphatic cancers and suicide.

  17. Electrical energy and cost for the mirror fusion test facility

    International Nuclear Information System (INIS)

    Pence, G.

    1983-01-01

    An operational scenario has been developed for the Mirror Fusion Test Facility (MFTF-B) based on the System Requirements, our experience with existing systems, and discussions with the project engineers and designers who are responsible for the systems. This scenario was used to predict the amount of electrical energy needed for running the facility. A generic type listing is included for the equipment considered in each system. A figure shows the anticipated power drain during a five-minute shot sequence from the 115-kV substation, and from the 230-kV and direct feed substations. At this time, the three major substations that will be used for the MFTF-B are billed under three different rate schedules. A table lists these schedules and what they are anticipated as being when the facility becomes operational. The system availability, which is expected to be 0.7 or better, has not been factored into these calculations. This gives a worst case cost for the MFTF-B. Based on this study, it appears that our energy bill will be over $500 000 per month, on the average. This expenditure will constitute a significant portion of the budget needed to operate the MFTF-B. As the systems are refined, and a more accurate picture is obtained as to the size and operational cycles of the equipment, this report will be updated

  18. Implementation of computational model for the evaluation of electromagnetic susceptibility of the cables for communication and control of high voltage substations; Implementacao de modelo computacional para a avaliacao da suscetibilidade eletromagnetica dos cabos de comunicacao e controle de subestacoes de alta tensao

    Energy Technology Data Exchange (ETDEWEB)

    Sartin, Antonio C.P. [Companhia de Transmissao de Energia Eletrica Paulista (CTEEP), Bauru, SP (Brazil); Dotto, Fabio R.L.; Sant' Anna, Cezar J.; Thomazella, Rogerio [Fundacao para o Desenvolvimento de Bauru, SP (Brazil); Ulson, Jose A.C.; Aguiar, Paulo R. de [Universidade Estadual Paulista Julio de Mesquita Filho (UNESP), Bauru, SP (Brazil)

    2009-07-01

    This work show the implementation of a electromagnetic model for supervision cable, protection, communication and high voltage substations control that was investigated in literature and adapted. The model was implemented by using a computational tool in order to obtain the electromagnetic behavior of various cables used in CTEEP substation, subject to several sources of electromagnetic interference in this inhospitable environment, such as lightning strikes, outbreaks of maneuvers switching and the corona effect. The results obtained in computer simulations were compared with results of laboratory tests carried out on a lot of cables that represent those systems that are present in substations 440 kV. This study characterized the electromagnetic interference, ranked them, identified possible susceptible points in the substation, which contributed to the development of a technical procedure that minimizes unwanted effects caused in communication systems and substation control. This developed procedure also assured the maximum reliability and availability in the operation of the electrical power system to the company.

  19. Wireless (Power Transfer Transmission of Electrical Energy (Electricity Intended for Consumer Purposes up to 50 W

    Directory of Open Access Journals (Sweden)

    Marek Piri

    2016-01-01

    Full Text Available This project deals with Power Semiconductor Systems PSS for wireless transmission of electricity to the power of 50~W with regard to the distance and transmission efficiency. We decided to use electromagnetic resonance for electrical energy transmission. For experimental verification, we have wound two coils of identical dimensions. At a given power transmission solutions, we obtain the highest efficiency η = 70% at a distance of 5 cm, where the transmitted power was 48 W.

  20. Korean district heating. Part 2: Investigation of the consumption pattern in a substation at Korea District Heating Corporation at the turn of the year 1994/95

    Energy Technology Data Exchange (ETDEWEB)

    Joensson, Mats; Olsson, Nils

    1996-05-01

    This thesis, which is the second part of two, analyses the consumption pattern and the conditions for district heating in the Republic of Korea at the turn of the year 1994-95. It is based on a study made in Seoul at Korea District Heating Corporation which is the largest district heating utility in Korea. District heating was introduced in the 80s because of the environmental advantages. In 1994 KDHC provided 340 000 households with district heating. KDHC receives most of its thermal energy from combined heat and power plants which use natural gas as fuel. One substation was chosen for the investigation and temperature, flow, and pressure were measured. A typical Korean substation has heat exchangers connected in parallel in only one step and the apartment complexes use floor heating for internal heating. The space heating load shows a linear relation to the outdoor temperature. The hot tap-water consumption shows a highly varying pattern with peak loads in the morning and evening. There were also an oscillating pattern for some of the temperatures and flows caused by poor regulation. DH suits very well to Korea with its climate and the overpopulated cities. KDHC:s expansion will help to make Korea one of the leading countries in modern district heating. 10 refs, 36 figs, 11 tabs

  1. A Cognitive Radio-Based Energy-Efficient System for Power Transmission Line Monitoring in Smart Grids

    Directory of Open Access Journals (Sweden)

    Saeed Ahmed

    2017-01-01

    Full Text Available The research in industry and academia on smart grids is predominantly focused on the regulation of generated power and management of its consumption. Because transmission of bulk-generated power to the consumer is immensely reliant on secure and efficient transmission grids, comprising huge electrical and mechanical assets spanning a vast geographic area, there is an impending need to focus on the transmission grids as well. Despite the challenges in wireless technologies for SGs, cognitive radio networks are considered promising for provisioning of communications services to SGs. In this paper, first, we present an IEEE 802.22 wireless regional area network cognitive radio-based network model for smart monitoring of transmission lines. Then, for a prolonged lifetime of battery finite monitoring network, we formulate the spectrum resource allocation problem as an energy efficiency maximization problem, which is a nonlinear integer programming problem. To solve this problem in an easier way, we propose an energy-efficient resource-assignment scheme based on the Hungarian method. Performance analysis shows that, compared to a pure opportunistic assignment scheme with a throughput maximization objective and compared to a random scheme, the proposed scheme results in an enhanced lifetime while consuming less battery energy without compromising throughput performance.

  2. Adaptive Control of the Packet Transmission Period with Solar Energy Harvesting Prediction in Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Kideok Kwon

    2015-04-01

    Full Text Available A number of research works has studied packet scheduling policies in energy scavenging wireless sensor networks, based on the predicted amount of harvested energy. Most of them aim to achieve energy neutrality, which means that an embedded system can operate perpetually while meeting application requirements. Unlike other renewable energy sources, solar energy has the feature of distinct periodicity in the amount of harvested energy over a day. Using this feature, this paper proposes a packet transmission control policy that can enhance the network performance while keeping sensor nodes alive. Furthermore, this paper suggests a novel solar energy prediction method that exploits the relation between cloudiness and solar radiation. The experimental results and analyses show that the proposed packet transmission policy outperforms others in terms of the deadline miss rate and data throughput. Furthermore, the proposed solar energy prediction method can predict more accurately than others by 6.92%.

  3. Adaptive control of the packet transmission period with solar energy harvesting prediction in wireless sensor networks.

    Science.gov (United States)

    Kwon, Kideok; Yang, Jihoon; Yoo, Younghwan

    2015-04-24

    A number of research works has studied packet scheduling policies in energy scavenging wireless sensor networks, based on the predicted amount of harvested energy. Most of them aim to achieve energy neutrality, which means that an embedded system can operate perpetually while meeting application requirements. Unlike other renewable energy sources, solar energy has the feature of distinct periodicity in the amount of harvested energy over a day. Using this feature, this paper proposes a packet transmission control policy that can enhance the network performance while keeping sensor nodes alive. Furthermore, this paper suggests a novel solar energy prediction method that exploits the relation between cloudiness and solar radiation. The experimental results and analyses show that the proposed packet transmission policy outperforms others in terms of the deadline miss rate and data throughput. Furthermore, the proposed solar energy prediction method can predict more accurately than others by 6.92%.

  4. Price-based optimal control of power flow in electrical energy transmission networks

    NARCIS (Netherlands)

    Jokic, A.; Lazar, M.; Bosch, van den P.P.J.; Bemporad, A.; Bicchi, A.; Buttazzo, G.

    2007-01-01

    This article presents a novel control scheme for achieving optimal power balancing and congestion control in electrical energy transmission networks via nodal prices. We develop an explicit controller that guarantees economically optimal steady-state operation while respecting all line flow

  5. Research on energy transmission calculation problem on laser detecting submarine

    Science.gov (United States)

    Fu, Qiang; Li, Yingchao; Zhang, Lizhong; Wang, Chao; An, Yan

    2014-12-01

    The laser detection and identification is based on the method of using laser as the source of signal to scan the surface of ocean. If the laser detection equipment finds out the target, it will immediately reflect the returning signal, and then through receiving and disposing the returning signal by the receiving system, to realize the function of detection and identification. Two mediums channels should be though in the process of laser detection transmission, which are the atmosphere and the seawater. The energy loss in the process of water transport, mainly considering the surface reflection and scattering attenuation and internal attenuation factors such as seawater. The energy consumption though atmospheric transmission, mainly considering the absorption of atmospheric and the attenuation causing by scattering, the energy consumption though seawater transmission, mainly considering the element such as surface reflection, the attenuation of scattering and internal attenuation of seawater. On the basis of the analysis and research, through the mode of establishment of atmospheric scattering, the model of sea surface reflection and the model of internal attenuation of seawater, determine the power dissipation of emitting lasers system, calculates the signal strength that reaches the receiver. Under certain conditions, the total attenuation of -98.92 dB by calculation, and put forward the related experiment scheme by the use of Atmospheric analog channel, seawater analog channel. In the experiment of the theory, we use the simulation pool of the atmosphere and the sea to replace the real environment where the laser detection system works in this kind of situation. To start with, we need to put the target in the simulating seawater pool of 10 meters large and then control the depth of the target in the sea level. We, putting the laser detection system in position where it is 2 kilometers far from one side, secondly use the equipment to aim at the target in some

  6. Model documentation: Natural gas transmission and distribution model of the National Energy Modeling System. Volume 1

    International Nuclear Information System (INIS)

    1995-01-01

    The Natural Gas Transmission and Distribution Model (NGTDM) is the component of the National Energy Modeling System (NEMS) that is used to represent the domestic natural gas transmission and distribution system. NEMS was developed in the Office of integrated Analysis and Forecasting of the Energy information Administration (EIA). NEMS is the third in a series of computer-based, midterm energy modeling systems used since 1974 by the EIA and its predecessor, the Federal Energy Administration, to analyze domestic energy-economy markets and develop projections. The NGTDM is the model within the NEMS that represents the transmission, distribution, and pricing of natural gas. The model also includes representations of the end-use demand for natural gas, the production of domestic natural gas, and the availability of natural gas traded on the international market based on information received from other NEMS models. The NGTDM determines the flow of natural gas in an aggregate, domestic pipeline network, connecting domestic and foreign supply regions with 12 demand regions. The methodology employed allows the analysis of impacts of regional capacity constraints in the interstate natural gas pipeline network and the identification of pipeline capacity expansion requirements. There is an explicit representation of core and noncore markets for natural gas transmission and distribution services, and the key components of pipeline tariffs are represented in a pricing algorithm. Natural gas pricing and flow patterns are derived by obtaining a market equilibrium across the three main elements of the natural gas market: the supply element, the demand element, and the transmission and distribution network that links them. The NGTDM consists of four modules: the Annual Flow Module, the Capacity F-expansion Module, the Pipeline Tariff Module, and the Distributor Tariff Module. A model abstract is provided in Appendix A

  7. Model documentation: Natural gas transmission and distribution model of the National Energy Modeling System. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-17

    The Natural Gas Transmission and Distribution Model (NGTDM) is the component of the National Energy Modeling System (NEMS) that is used to represent the domestic natural gas transmission and distribution system. NEMS was developed in the Office of integrated Analysis and Forecasting of the Energy information Administration (EIA). NEMS is the third in a series of computer-based, midterm energy modeling systems used since 1974 by the EIA and its predecessor, the Federal Energy Administration, to analyze domestic energy-economy markets and develop projections. The NGTDM is the model within the NEMS that represents the transmission, distribution, and pricing of natural gas. The model also includes representations of the end-use demand for natural gas, the production of domestic natural gas, and the availability of natural gas traded on the international market based on information received from other NEMS models. The NGTDM determines the flow of natural gas in an aggregate, domestic pipeline network, connecting domestic and foreign supply regions with 12 demand regions. The methodology employed allows the analysis of impacts of regional capacity constraints in the interstate natural gas pipeline network and the identification of pipeline capacity expansion requirements. There is an explicit representation of core and noncore markets for natural gas transmission and distribution services, and the key components of pipeline tariffs are represented in a pricing algorithm. Natural gas pricing and flow patterns are derived by obtaining a market equilibrium across the three main elements of the natural gas market: the supply element, the demand element, and the transmission and distribution network that links them. The NGTDM consists of four modules: the Annual Flow Module, the Capacity F-expansion Module, the Pipeline Tariff Module, and the Distributor Tariff Module. A model abstract is provided in Appendix A.

  8. ENERGY EFFICIENCY OF DIESEL LOCOMOTIVE HYDRAULIC TRANSMISSION TESTS AT LOCOMOTIVE REPAIR PLANT

    Directory of Open Access Journals (Sweden)

    B. E. Bodnar

    2015-10-01

    Full Text Available Purpose. In difficult economic conditions, cost reduction of electricity consumption for the needs of production is an urgent task for the country’s industrial enterprises. Technical specifications of enterprises, which repair diesel locomotive hydraulic transmission, recommend conducting a certain amount of evaluation and regulatory tests to monitor their condition after repair. Experience shows that a significant portion of hydraulic transmission defects is revealed by bench tests. The advantages of bench tests include the ability to detect defects after repair, ease of maintenance of the hydraulic transmission and relatively low labour intensity for eliminating defects. The quality of these tests results in the transmission resource and its efficiency. Improvement of the technology of plant post-repairs hydraulic tests in order to reduce electricity consumption while testing. Methodology. The possible options for hydraulic transmission test bench improvement were analysed. There was proposed an energy efficiency method for diesel locomotive hydraulic transmission testing in locomotive repair plant environment. This is achieved by installing additional drive motor which receives power from the load generator. Findings. Based on the conducted analysis the necessity of improving the plant stand testing of hydraulic transmission was proved. The variants of the stand modernization were examined. The test stand modernization analysis was conducted. Originality. The possibility of using electric power load generator to power the stand electric drive motor or the additional drive motor was theoretically substantiated. Practical value. A variant of hydraulic transmission test stand based on the mutual load method was proposed. Using this method increases the hydraulic transmission load range and power consumption by stand remains unchanged. The additional drive motor will increase the speed of the input shaft that in its turn wil allow testing in

  9. Renewable Energy Zones for Balancing Siting Trade-offs in India

    Energy Technology Data Exchange (ETDEWEB)

    Deshmukh, Ranjit [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Wu, Grace C. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Phadke, Amol [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-06-27

    India’s targets of 175 GW of renewable energy capacity by 2022, and 40% generation capacity from non-fossil fuel sources by 2030 will require a rapid and dramatic increase in solar and wind capacity deployment and overcoming its associated economic, siting, and power system challenges. The objective of this study was to spatially identify the amount and quality of wind and utility-scale solar resource potential in India, and the possible siting-related constraints and opportunities for development of renewable resources. Using the Multi-criteria Analysis for Planning Renewable Energy (MapRE) methodological framework, we estimated several criteria valuable for the selection of sites for development for each identified potential "zone", such as the levelized cost of electricity, distance to nearest substation, capacity value (or the temporal matching of renewable energy generation to demand), and the type of land cover. We find that high quality resources are spatially heterogeneous across India, with most wind and solar resources concentrated in the southern and western states, and the northern state of Rajasthan. Assuming India's Central Electricity Regulatory Commission's norms, we find that the range of levelized costs of generation of wind and solar PV resources overlap, but concentrated solar power (CSP) resources can be approximately twice as expensive. Further, the levelized costs of generation vary much more across wind zones than those across solar zones because of greater heterogeneity in the quality of wind resources compared to that of solar resources. When considering transmission accessibility, we find that about half of all wind zones (47%) and two-thirds of all solar PV zones (66%) are more than 25 km from existing 220 kV and above substations, suggesting potential constraints in access to high voltage transmission infrastructure and opportunities for preemptive transmission planning to scale up RE development. Additionally and

  10. Exploring Distributed Energy Alternatives to Electrical Distribution Grid Expansion in Souhern California Edison Service Territory

    Energy Technology Data Exchange (ETDEWEB)

    Stovall, Therese K [ORNL; Kingston, Tim [Gas Technology Institute

    2005-12-01

    Distributed energy (DE) technologies have received much attention for the energy savings and electric power reliability assurances that may be achieved by their widespread adoption. Fueling the attention have been the desires to globally reduce greenhouse gas emissions and concern about easing power transmission and distribution system capacity limitations and congestion. However, these benefits may come at a cost to the electric utility companies in terms of lost revenue and concerns with interconnection on the distribution system. This study assesses the costs and benefits of DE to both consumers and distribution utilities and expands upon a precursory study done with Detroit Edison (DTE)1, by evaluating the combined impact of DE, energy-efficiency, photovoltaics (a use of solar energy), and demand response that will shape the grid of the future. This study was funded by the U.S. Department of Energy (DOE), Gas Research Institute (GRI), American Electric Power (AEP), and Gas Technology Institute's (GTI) Distributed Energy Collaborative Program (DECP). It focuses on two real Southern California Edison (SCE) circuits, a 13 MW suburban circuit fictitiously named Justice on the Lincoln substation, and an 8 MW rural circuit fictitiously named Prosper on the Washington Substation. The primary objectives of the study were threefold: (1) Evaluate the potential for using advanced energy technologies, including DE, energy-efficiency (EE), demand response, electricity storage, and photovoltaics (PV), to reshape electric load curves by reducing peak demand, for real circuits. (2) Investigate the potential impact on guiding technology deployment and managing operation in a way that benefits both utilities and their customers by: (a) Improving grid load factor for utilities; (b) Reducing energy costs for customers; and (c) Optimizing electric demand growth. (3) Demonstrate benefits by reporting on a recently installed advanced energy system at a utility customer site

  11. Dynamic energy performance analysis: Case study for energy efficiency retrofits of hospital buildings

    International Nuclear Information System (INIS)

    Buonomano, Annamaria; Calise, Francesco; Ferruzzi, Gabriele; Palombo, Adolfo

    2014-01-01

    This paper investigates several actions for the energy refurbishment of some buildings of the University Hospital Federico II of Naples. The analysis focuses on a specific lot of 4 buildings, representative of the whole district hospital. For those structures, sustainable energy savings actions are investigated. They regard the installation of: i) roofs thermal insulation; ii) a substation climatic 3-way valve; iii) radiators thermostatic valves; iv) AHU (air handling unit) time-programmable regulation. This paper aims at presenting an investigation methodology, useful for designers and other stakeholders involved in hospital energy refurbishments, based on an integrated approach which combines dynamic energy performance simulations and experimental campaigns. In order to measure all the simulations' missing input parameters, a suitable experimental analysis, including measurements of temperature, humidity, flow rate and density of construction materials, is performed. A thermographic investigation is also performed for investigating the building envelope performance. This analysis showed that significant savings can be achieved especially by adopting radiators thermostatic valves and AHU regulations. Coherently, the installation of a 3-way valve in the substation does not determine significant additional savings when radiators thermostatic valves are already installed. For high-rise buildings, roofs insulation returns only marginal reductions of space heating and cooling demands. - Highlights: • Energy saving measures applied to the largest hospital of South Italy are analyzed. • A new approach combining dynamic simulations and measurements is implemented. • Thermography, temperature and flow measurements are performed. • High savings are achieved by adopting thermostatic valves and AHU control systems. • The simplest energy saving actions resulted to be the most profitable ones

  12. A method of applying two-pump system in automatic transmissions for energy conservation

    Directory of Open Access Journals (Sweden)

    Peng Dong

    2015-06-01

    Full Text Available In order to improve the hydraulic efficiency, modern automatic transmissions tend to apply electric oil pump in their hydraulic system. The electric oil pump can support the mechanical oil pump for cooling, lubrication, and maintaining the line pressure at low engine speeds. In addition, the start–stop function can be realized by means of the electric oil pump; thus, the fuel consumption can be further reduced. This article proposes a method of applying two-pump system (one electric oil pump and one mechanical oil pump in automatic transmissions based on the forward driving simulation. A mathematical model for calculating the transmission power loss is developed. The power loss transfers to heat which requires oil flow for cooling and lubrication. A leakage model is developed to calculate the leakage of the hydraulic system. In order to satisfy the flow requirement, a flow-based control strategy for the electric oil pump is developed. Simulation results of different driving cycles show that there is a best combination of the size of electric oil pump and the size of mechanical oil pump with respect to the optimal energy conservation. Besides, the two-pump system can also satisfy the requirement of the start–stop function. This research is extremely valuable for the forward design of a two-pump system in automatic transmissions with respect to energy conservation and start–stop function.

  13. Type B investigation of electrical fault in 351 Substation, December 4, 1994

    International Nuclear Information System (INIS)

    Debban, H.L.; Shearer, C.A.; Boger, R.M.; McDonald, G.P.; Eyre, L.E.; Dell, L.D.; Kelly, D.S.

    1995-02-01

    On December 4, 1994, at 2132:10 hours, an electrical failure of a cable-tapping splice resulted in a fire in the 300 Area of the DOE Hanford Site. The fire occurred in the yard of Substation 351 in electrical Vault R122V, where the cable-tapping splice was located. The fire incinerated all cables passing to and through the vault causing them to fail. The failure of the cables resulted in a power outage to twenty customers in the 300 Area. The vault was electrically isolated, and power was restored to the electrical distribution system at 2311 hours. This report contains the accident scenario, accident analysis, direct cause and root and contributing causes

  14. Type B investigation of electrical fault in 351 Substation, December 4, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Debban, H.L.; Shearer, C.A.; Boger, R.M.; McDonald, G.P. [ICF Kaiser Hanford Co., Richland, WA (United States); Eyre, L.E.; Dell, L.D.; Kelly, D.S. [Westinghouse Hanford Co., Richland, WA (United States)

    1995-02-01

    On December 4, 1994, at 2132:10 hours, an electrical failure of a cable-tapping splice resulted in a fire in the 300 Area of the DOE Hanford Site. The fire occurred in the yard of Substation 351 in electrical Vault R122V, where the cable-tapping splice was located. The fire incinerated all cables passing to and through the vault causing them to fail. The failure of the cables resulted in a power outage to twenty customers in the 300 Area. The vault was electrically isolated, and power was restored to the electrical distribution system at 2311 hours. This report contains the accident scenario, accident analysis, direct cause and root and contributing causes.

  15. Efficiency and the public interest: QF transmission and the Energy Policy Act of 1992

    International Nuclear Information System (INIS)

    Fox-Penner, P.

    1993-01-01

    Prior to the enactment of the Energy Policy Act of 1992 (Act), most Federal Energy Regulatory Commission (FERC or Commission) deliberations involving transmission services did not occur in transmission rate or service proceedings per se. The Commission conducted a number of general inquiries or studies of the subject, including setting the terms and conditions of transmission services as part of merger proceedings and open-quotes market-basedclose quotes pricing proceedings. With the passage of the Act, the FERC is likely to be asked to confront the advisability of requiring transmission services in a more direct manner. The Act permits open-quotes[a]ny electric utility, Federal power marketing agency, or any other person generating electrical energy for sale for resaleclose quotes to petition the Commission for a wheeling order. The FERC may order wheeling in accordance with section 212 of the Federal Power Act (FPA) and a finding that such wheeling would open-quotes otherwise be in the public interest.close quotes When compounded with the need to find that wheeling is in the public interest, the requirements set forth in section 212 are considerable. This article focuses on an important area of section 212 criteria, namely the interplay between between the public interest and economic efficiency criteria in the case of Public Utility Regulatory Policies Act of 1978 (PURPA) Qualifying Facilities (QF). Two recent proceedings in which the FERC considered the need to provide power transmission service guarantees for QFs are analyzed from the standpoint of public and private economic welfare. The two proceedings are the merger of Utah Power ampersand Light Company, PacifiCorp, PC/UP ampersand L Merging Corporation (Utah) and the Western Systems Power Pool application (WSPP)

  16. A Pilot Directional Protection for HVDC Transmission Line Based on Relative Entropy of Wavelet Energy

    Directory of Open Access Journals (Sweden)

    Sheng Lin

    2015-07-01

    Full Text Available On the basis of analyzing high-voltage direct current (HVDC transmission system and its fault superimposed circuit, the direction of the fault components of the voltage and the current measured at one end of transmission line is certified to be different for internal faults and external faults. As an estimate of the differences between two signals, relative entropy is an effective parameter for recognizing transient signals in HVDC transmission lines. In this paper, the relative entropy of wavelet energy is applied to distinguish internal fault from external fault. For internal faults, the directions of fault components of voltage and current are opposite at the two ends of the transmission line, indicating a huge difference of wavelet energy relative entropy; for external faults, the directions are identical, indicating a small difference. The simulation results based on PSCAD/EMTDC show that the proposed pilot protection system acts accurately for faults under different conditions, and its performance is not affected by fault type, fault location, fault resistance and noise.

  17. Facilitating efficient augmentation of transmission networks to connect renewable energy generation: the Australian experience

    International Nuclear Information System (INIS)

    Wright, Glen

    2012-01-01

    Australia is heavily dependent on coal for electricity generation. The Renewable Energy Target has spurred growth in the utilization of renewable energy sources, with further growth expected into the future. Australia's strongest renewable energy sources are generally distant from the transmission network in resource ‘basins’. Investment is needed to augment the transmission network to enable delivery of electricity from these sources to consumers. Considerable economies of scale flow from anticipating the connection of numerous generators in an area over time and sizing augmentations accordingly. Following a lengthy rulemaking process, the National Electricity Rules were recently amended by a new rule, designed to facilitate the construction of such efficiently sized augmentations. However, the new rule is more conservative than initially envisaged, making little substantive change to the current frameworks for augmentation and connection. This paper outlines these frameworks and the rulemaking process and identifies the key debates surrounding the rule change are identified. This paper then provides a detailed analysis of the new rule, concluding that it is defective in a number of respects and is unlikely to result in the efficient and timely augmentation of the network needed to unlock the potential of Australia's strongest renewable energy resources. - Highlights: ► Remoteness of renewable energy sources is a barrier to greater renewable energy utilization. ► Significant economies of scale flow from efficiently-sized transmission network augmentation. ► Current frameworks in Australia do not incentivise efficiently-sized network augmentations. ► The lack of property rights in an augmentation is particularly problematic. ► The new Scale Efficient Network Extensions rule is not apt to facilitate efficiently-sized network augmentations.

  18. Touch and step potential analysis at 23.9kV to 4.16kV & 13.8kV to 4.16kV distribution substations with pad-mounted transformers, floating grounds, and other exposed ungrounded metal bodies using WinIGS

    Science.gov (United States)

    Guzman, David G.

    An electrical substation is composed of various subsystems that allow for the effective and safe operation of the power grid. One of the subsystems integrating a conventional substation is defined as the ground grid system. This system allows for the effective operation of the power grid and all the electrical equipment connected to it by providing a ground potential reference, commonly known as the system ground. In addition, the ground grid system provides safety to the workers and the public transiting inside or living nearby a substation by reducing the step and touch potential (or voltage) levels present during a system fault. In today's utility industry practices there is an increasing trend for using pad-mounted electrical equipment for substation applications in an effort to construct new or upgrade existing electrical facilities inside limited property spaces. This thesis work presents an analysis for the effects of touch and step voltages at existing distribution substations where 23.9kV to 4.16kV & 13.8kV to 4.16kV pad-mounted transformers and other pad-mounted switchgear was installed to replace the traditional station class equipment. Moreover, this study will expose modeling techniques employed to define and determine the effects of floating grounds and other exposed metal bodies inside or surrounding these substations using WinIGS; this is in an effort to determine any risks of electric shock associated with this type of installations. The results presented in this work are intended to verify the requirements for the ground grid analysis and design for 4.16kV distribution substations with pad-mounted equipment in order to prevent dangerous step and touch voltage levels appearing at these sites during system faults; and ultimately prevent exposing individuals to the risk of an electric shock.

  19. First operation experiences from a 30 kV 104 MVA HTS power cable installed in a utility substation

    DEFF Research Database (Denmark)

    Willen, D.; Hansen, F.; Daumling, M.

    2002-01-01

    realistic conditions in the substation of Amager (AMK). Approximately 50 000 private and business customers are supplied from this cable. The load can be adjusted from 20% to 100% of the power supplied and the number of branches connected can be altered. This and other early HTS power installations...... are expected to act as ice-breakers for the HTS technology...

  20. Reliability of supply of switchgear for auxiliary low voltage in substations extra high voltage to high voltage

    Directory of Open Access Journals (Sweden)

    Perić Dragoslav M.

    2015-01-01

    Full Text Available Switchgear for auxiliary low voltage in substations (SS of extra high voltages (EHV to high voltage (HV - SS EHV/HV kV/kV is of special interest for the functioning of these important SS, as it provides a supply for system of protection and other vital functions of SS. The article addresses several characteristic examples involving MV lines with varying degrees of independence of their supply, and the possible application of direct transformation EHV/LV through special voltage transformers. Auxiliary sources such as inverters and diesel generators, which have limited power and expensive energy, are also used for the supply of switchgear for auxiliary low voltage. Corresponding reliability indices are calculated for all examples including mean expected annual engagement of diesel generators. The applicability of certain solutions of switchgear for auxiliary low voltage SS EHV/HV, taking into account their reliability, feasibility and cost-effectiveness is analyzed too. In particular, the analysis of applications of direct transformation EHV/LV for supply of switchgear for auxiliary low voltage, for both new and existing SS EHV/HV.

  1. The transmission business rate order application, 1999-2000 : application to the Ontario Energy Board

    International Nuclear Information System (INIS)

    1998-01-01

    The Ontario government is restructuring the electric power industry by introducing competition to the generation and retailing sectors, as well as to the transmission and distribution sectors within the industry. This application marks the beginning of the regulation of the Ontario Hydro Services Company Inc.'s (OHSC) transmission business by the Ontario Energy Board (OEB). The OHSC has asked the OEB to approve a revenue requirement for the transmission business and rates derived from the revenue requirement for unbundled transmission services to customers for the year 1999. For the year 2000, the OHSC asked the OEB to approve the performance-based regulation mechanism and the transmission rates derived from that mechanism. This document includes the actual text of the application and provides the justification for the $1,327 million revenue requirement for 1999 and the PBR framework forecast of $ 1,291 million for the year 2000. tabs., figs

  2. Development of 3 D Electric Field Analysis Program under Power System Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Myung, S. H.; Lee, K. C.; Lee, J. B.; Ha, T. H. [Korea Electrotechnology Research Institute, Changwon (Korea, Republic of)

    1996-12-01

    Recently, as the effects of electric fields on animals, human beings and sensitive equipment have been reported, the study on electric fields has become more important. Transmission lines and substation among power facilities are dominant parts related to electrical environment. Electric field analysis of transmission line has been made using image charge method or CSM since 1970`s, however electric field analysis in substation has been rarely studied due to the complexity of three dimensional evaluation of an electric field in substation. For the rather complicated and time-consuming three-dimensional electric field calculation in the vicinity of transmission lines and substations, this study proposes an effective numerical calculation method based on Charge Simulation Method(CSM). In order to represent non-uniform charge distribution on an electrode better, it is subdivided into small segments with linear charge density. Each segment with linear charge density can be easily represented by a generalized finite line type of charge whose expressions for potential and electric field were analytically derived and which was named {sup f}inite slant line charge in this study. As for the arrangement of small segments of a subdivided electrode, it has been found that unequally spaced arrangement method is superior to equally spaced one. In order to arrange segments fast and effectively, effective formulas were derived from multiple regression analysis of many simulations. The proposed method is applied to the electric field calculation around the transmission lines with significant change in direction and substation busbars. (author). refs., figs., tabs.

  3. A Monte Carlo study of the energy spectra and transmission characteristics of scattered radiation from x-ray computed tomography.

    Science.gov (United States)

    Platten, David John

    2014-06-01

    Existing data used to calculate the barrier transmission of scattered radiation from computed tomography (CT) are based on primary beam CT energy spectra. This study uses the EGSnrc Monte Carlo system and Epp user code to determine the energy spectra of CT scatter from four different primary CT beams passing through an ICRP 110 male reference phantom. Each scatter spectrum was used as a broad-beam x-ray source in transmission simulations through seventeen thicknesses of lead (0.00-3.50 mm). A fit of transmission data to lead thickness was performed to obtain α, β and γ parameters for each spectrum. The mean energy of the scatter spectra were up to 12.3 keV lower than that of the primary spectrum. For 120 kVp scatter beams the transmission through lead was at least 50% less than predicted by existing data for thicknesses of 1.5 mm and greater; at least 30% less transmission was seen for 140 kVp scatter beams. This work has shown that the mean energy and half-value layer of CT scatter spectra are lower than those of the corresponding primary beam. The transmission of CT scatter radiation through lead is lower than that calculated with currently available data. Using the data from this work will result in less lead shielding being required for CT scanner installations.

  4. Development of transmission dose estimation algorithm for in vivo dosimetry in high energy radiation treatment

    International Nuclear Information System (INIS)

    Yun, Hyong Geun; Shin, Kyo Chul; Hun, Soon Nyung; Woo, Hong Gyun; Ha, Sung Whan; Lee, Hyoung Koo

    2004-01-01

    In vivo dosimetry is very important for quality assurance purpose in high energy radiation treatment. Measurement of transmission dose is a new method of in vivo dosimetry which is noninvasive and easy for daily performance. This study is to develop a tumor dose estimation algorithm using measured transmission dose for open radiation field. For basic beam data, transmission dose was measured with various field size (FS) of square radiation field, phantom thickness (Tp), and phantom chamber distance (PCD) with a acrylic phantom for 6 MV and 10 MV X-ray. Source to chamber distance (SCD) was set to 150 cm. Measurement was conducted with a 0.6 cc Farmer type ion chamber. By using regression analysis of measured basic beam data, a transmission dose estimation algorithm was developed. Accuracy of the algorithm was tested with flat solid phantom with various thickness in various settings of rectangular fields and various PCD. In our developed algorithm, transmission dose was equated to quadratic function of log(A/P) (where A/P is area-perimeter ratio) and the coefficients of the quadratic functions were equated to tertiary functions of PCD. Our developed algorithm could estimate the radiation dose with the errors within ±0.5% for open square field, and with the errors within ±1.0% for open elongated radiation field. Developed algorithm could accurately estimate the transmission dose in open radiation fields with various treatment settings of high energy radiation treatment. (author)

  5. Run-Curve Design for Energy Saving Operation in a Modern DC-Electrification

    Science.gov (United States)

    Koseki, Takafumi; Noda, Takashi

    Mechanical brakes are often used by electric trains. These brakes have a few problems like response speed, coefficient of friction, maintenance cost and so on. As a result, methods for actively using regenerative brakes are required. In this paper, we propose the useful pure electric braking, which would involve ordinary brakes by only regenerative brakes without any mechanical brakes at high speed. Benefits of our proposal include a DC-electrification system with regenerative substations that can return powers to the commercial power system and a train that can use the full regenerative braking force. We furthermore evaluate the effects on running time and energies saved by regenerative substations in the proposed method.

  6. Principle of energy-filtering transmission electron microscopy and its applications

    International Nuclear Information System (INIS)

    Kurata, Hiroki

    1997-01-01

    Energy-filtering transmission electron microscopy (EFTEM) is widely used to make images and diffraction patterns more quantitative by removing the inelastic background, and to perform elemental and chemical mapping at high spatial resolution. The principal factors restricting the spatial resolution in elemental maps are discussed. The relativistic effect on inelastic scattering cross-section, which becomes significant for high-voltage EFTEM analysis, is also discussed in relation to the detection efficiency of core-loss signals. (author)

  7. Energy-Efficient Multicast Transmission for Underlay Device-to-Device Communications: A Social-Aware Perspective

    Directory of Open Access Journals (Sweden)

    Fan Jiang

    2017-01-01

    Full Text Available In this paper, by utilizing the social relationships among mobile users, we present a framework of energy-efficient cluster formation and resource allocation for multicast D2D transmission. In particular, we first deal with D2D multicast cluster/group formation strategy from both physical distance and social trust level. Then we aim to maximize the overall energy-efficiency of D2D multicast groups through resource allocation and power control scheme, which considers the quality-of-service (QoS requirements of both cellular user equipment and D2D groups. A heuristic algorithm is proposed to solve above energy-efficiency problem with less complexity. After that, considering the limited battery capacity of mobile users, we propose an energy and social aware cluster head update algorithm, which incorporates both the energy constraint and social centrality measurement. Numerical results indicate that the proposed social-tie based D2D multicast group formation and update algorithm form a multicast group in an energy efficient way. Moreover, the proposed resource and power allocation scheme achieves better energy efficiency in terms of throughput per energy consumption. These results show that, by exploiting social domain information, underlay D2D multicast transmission has high practical potential in saving the source on wireless links and in the backhaul.

  8. Research on hybrid transmission mode for HVDC with optimal thermal power and renewable energy combination

    Science.gov (United States)

    Zhang, Jinfang; Yan, Xiaoqing; Wang, Hongfu

    2018-02-01

    With the rapid development of renewable energy in Northwest China, curtailment phenomena is becoming more and more serve owing to lack of adjustment ability and enough transmission capacity. Based on the existing HVDC projects, exploring the hybrid transmission mode associated with thermal power and renewable power will be necessary and important. This paper has proposed a method on optimal thermal power and renewable energy combination for HVDC lines, based on multi-scheme comparison. Having established the mathematic model for electric power balance in time series mode, ten different schemes have been picked for figuring out the suitable one by test simulation. By the proposed related discriminated principle, including generation device utilization hours, renewable energy electricity proportion and curtailment level, the recommendation scheme has been found. The result has also validated the efficiency of the method.

  9. Development of a secondary electron energy analyzer for a transmission electron microscope.

    Science.gov (United States)

    Magara, Hideyuki; Tomita, Takeshi; Kondo, Yukihito; Sato, Takafumi; Akase, Zentaro; Shindo, Daisuke

    2018-04-01

    A secondary electron (SE) energy analyzer was developed for a transmission electron microscope. The analyzer comprises a microchannel plate (MCP) for detecting electrons, a coil for collecting SEs emitted from the specimen, a tube for reducing the number of backscattered electrons incident on the MCP, and a retarding mesh for selecting the energy of SEs incident on the MCP. The detection of the SEs associated with charging phenomena around a charged specimen was attempted by performing electron holography and SE spectroscopy using the energy analyzer. The results suggest that it is possible to obtain the energy spectra of SEs using the analyzer and the charging states of a specimen by electron holography simultaneously.

  10. System of failures diagnosis for energy transmission systems, using Petri nets

    International Nuclear Information System (INIS)

    Zapata, German; Grisales, John Faber; Gomez, Juan Camilo; Quintero Henao, Luis Fernando

    2005-01-01

    An expert system of second generation was used integrating the inverse Petri nets (RPN) and the systems based on rules (rule-based system) for the accomplishment of a program in Visual Basic that helps in the obtaining of an opportune and fast analysis of transmission of energy at the time of happening a fault in anymore of its components (line or bus). The program is proven in a portion of system IEEE -118 standard bus test system, in which two extracted cases of literature are developed and are the obtained results. Finally tests realized with the method developed in the laboratory of machines of the national university of Colombia, Medellin campus, simulating a system of transmission with two lines and two buses

  11. Dual-Hop VLC/RF Transmission System with Energy Harvesting Relay under Delay Constraint

    KAUST Repository

    Rakia, Tamer; Yang, Hong-Chuan; Gebali, Fayez; Alouini, Mohamed-Slim

    2017-01-01

    In this paper, we introduce a dual-hop visible light communication (VLC) / radio frequency (RF) transmission system to extend the coverage of indoor VLC systems. The relay between the two hops is able to harvest light energy from different

  12. Two-Stage Design Method for Enhanced Inductive Energy Transmission with Q-Constrained Planar Square Loops.

    Directory of Open Access Journals (Sweden)

    Akaa Agbaeze Eteng

    Full Text Available Q-factor constraints are usually imposed on conductor loops employed as proximity range High Frequency Radio Frequency Identification (HF-RFID reader antennas to ensure adequate data bandwidth. However, pairing such low Q-factor loops in inductive energy transmission links restricts the link transmission performance. The contribution of this paper is to assess the improvement that is reached with a two-stage design method, concerning the transmission performance of a planar square loop relative to an initial design, without compromise to a Q-factor constraint. The first stage of the synthesis flow is analytical in approach, and determines the number and spacing of turns by which coupling between similar paired square loops can be enhanced with low deviation from the Q-factor limit presented by an initial design. The second stage applies full-wave electromagnetic simulations to determine more appropriate turn spacing and widths to match the Q-factor constraint, and achieve improved coupling relative to the initial design. Evaluating the design method in a test scenario yielded a more than 5% increase in link transmission efficiency, as well as an improvement in the link fractional bandwidth by more than 3%, without violating the loop Q-factor limit. These transmission performance enhancements are indicative of a potential for modifying proximity HF-RFID reader antennas for efficient inductive energy transfer and data telemetry links.

  13. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-74)

    Energy Technology Data Exchange (ETDEWEB)

    Howington, John [Bonneville Power Administration (BPA), Portland, OR (United States)

    2002-07-01

    Vegetation Management for five Substations in the Malin District. BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Malin District of the Redmond Region.

  14. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-78)

    Energy Technology Data Exchange (ETDEWEB)

    Howington, John [Bonneville Power Administration (BPA), Portland, OR (United States)

    2002-07-01

    Vegetation Management for ten Substations in the Redmond District. BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Redmond District of the Redmond Region.

  15. Load forecasting at substations terminals - preliminary results; Previsao de carga em saidas de subestacoes - resultados preliminares

    Energy Technology Data Exchange (ETDEWEB)

    Fidalgo, J.N. [Instituto de Engenharia de Sistema e Computadores (INESC), Porto (Portugal). E-mail: jfidalgo@inescn.pt

    1999-07-01

    This paper presents the model developed for current intensity forecasting at the substation terminals. The main objective consists of regression process definition which allows some estimations on the future values for those currents, based on related historical data. Consideration of different time scheduling is intended. Neuronal networks have been used as regression basic tool. Finally, the results obtained up to the present are presented which demonstrate that the adopted strategy and tools are suitable for the objective to be attained.

  16. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Andrew D.; Wiser, Ryan; Porter, Kevin

    2009-02-02

    The rapid development of wind power that the United States has experienced over the last several years has been coupled with a growing concern that wind development will require substantial additions to the nation's transmission infrastructure. Transmission is particularly important for wind power due to the locational dependence of wind resources, the relatively low capacity factor of wind plants, and the mismatch between the short lead time to build a new wind project and the longer lead time often needed to plan, permit, and construct transmission. It is clear that institutional issues related to transmission planning, siting, and cost allocation will pose major obstacles to accelerated wind power deployment, but also of concern is the potential cost of this infrastructure build out. Simply put, how much extra cost will society bear to deliver wind power to load centers? Without an answer to this question, there can be no consensus on whether or not the cost of developing transmission for wind will be a major barrier to further wind deployment, or whether the institutional barriers to transmission expansion are likely to be of more immediate concern. In this report, we review a sample of 40 detailed transmission studies that have included wind power. These studies cover a broad geographic area, and were completed from 2001-2008. Our primary goal in reviewing these studies is to develop a better understanding of the transmission costs needed to access growing quantities of wind generation. A secondary goal is to gain a better appreciation of the differences in transmission planning approaches in order to identify those methodologies that seem most able to estimate the incremental transmission costs associated with wind development. Finally, we hope that the resulting dataset and discussion might be used to inform the assumptions, methods, and results of higher-level assessment models that are sometimes used to estimate the cost of wind deployment (e.g. NEMS

  17. Viability of conventional compact electric power substations in medium size cities - case study Sorocaba`s DTS; Viabilidade de subestacoes compactas convencionais em cidades de medio porte: caso pratico ETD Sorocaba

    Energy Technology Data Exchange (ETDEWEB)

    Guaraldo, N J; Goncalves, S M [Eletricidade de Sao Paulo SA, SP (Brazil); Sant` Anna, P B.E.; Fleury, V F; Moura Filho, W [CHROMA Engenharia (Brazil)

    1994-12-31

    This work presents the viability of compact transformers distributing power substations of in medium size cities, giving emphasis to three main aspects. The first aspect is generic and concerns the compactation economic viability, when compared to the conventional solution. The second, specific to the case of Sorocaba, in addition to present two compact disposal for the power substation, registers the opportunity for obtaining resources from the private enterprise. The third aspect takes into consideration the compatibility of technical proposals with the architecture of the cities. 2 refs., 10 figs., 1 tab.

  18. High voltage transmission of electrical energy over long distances

    Energy Technology Data Exchange (ETDEWEB)

    Tewari, S W

    1962-07-01

    Technical aspects of ac transmission lines, additional means of improving stability ac transmisson lines, insulation problems, ac transmission by cables, high voltage dc transmission, advantages of dc over ac transmission, disadvantages of dc transmission, use of underground cables for dc transmission, history of the development of conversion equipment; transmission schemes adopted on Gotland Island, Sweden; and economics of ac and dc transmission are discussed.

  19. Illumination, data transmission, and energy harvesting: the threefold advantage of VLC.

    Science.gov (United States)

    Sandalidis, Harilaos G; Vavoulas, Alexander; Tsiftsis, Theodoros A; Vaiopoulos, Nicholas

    2017-04-20

    Visible light communication (VLC) is a promising technology that meets illumination and information transmission requirements in an indoor environment. Because light waves convey energy, a VLC link may exploit that fact for energy harvesting purposes. In this context, a single light emitting diode lamp located at a close distance over a tablet or laptop PC can potentially offer simultaneous lighting, Internet access, and battery recharging without cables. The present study introduces this threefold role of VLC systems by properly adapting some energy harvesting receiver architectures recently launched for usage in RF communications. The rate-energy trade-off for these architectures is revealed in order to maximize the efficiency of simultaneous energy and information reception, by elaborating on indicative numerical results. Furthermore, the performance in terms of the bit-error rate for pulse amplitude modulated signals is investigated. The results obtained offer some useful insights into the effective optical receiver implementation from the aspect of information theory.

  20. Analysis of Energy Transmission Modes of Flyback Converter

    Directory of Open Access Journals (Sweden)

    GONG Shu

    2014-08-01

    Full Text Available It is of significance to investigate energy transmission modes of a flyback converter for its optimum design. In this paper, the ETMs of a flyback converter are divided into three modes, which are continuous conduction mode-complete inductor supply mode, continuous conduction mode- incomplete inductor supply mode and discontinuous conduction mode-incomplete inductor supply mode, respectively. A deep analysis of the operation is made, a reduction of the boundary condition between the modes is conducted and a comparison of current stress, transformer AP and output ripple voltage between the modes is performed. A 30W prototype is developed and its experiment is done. The experiment results are in agreement with the theoretical analysis quite well.

  1. Energy transmission re: Remote sites key to economic development for the Arctic and developing regions

    Energy Technology Data Exchange (ETDEWEB)

    Olds, G A [Dept. of Commerce and Development, Juneau, AK (United States)

    1992-01-01

    Recent developments of laser technology in energy beaming have converged to suggest the possibility of controlled experimentation in testing the viability, environmental soundness, and economic feasibility of wireless energy transmission in Alaska. The reasons why Alaska was thought to be an ideal setting for such experimental development are discussed.

  2. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-82)

    Energy Technology Data Exchange (ETDEWEB)

    Howington, John [Bonneville Power Administration (BPA), Portland, OR (United States)

    2002-08-13

    Vegetation Management for twenty-four Substations in the Burley District. BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Burley District of the Idaho Falls Region.

  3. Sustainable urban rail systems: Strategies and technologies for optimal management of regenerative braking energy

    International Nuclear Information System (INIS)

    González-Gil, Arturo; Palacin, Roberto; Batty, Paul

    2013-01-01

    Highlights: • Review of principal regenerative braking strategies and technologies for urban rail. • Different energy storage technologies are assessed for use in urban rail. • Optimising timetables is a preferential measure to improve energy efficiency. • Energy storage systems improve efficiency and reliability of urban rail systems. • Reversible substations allow for a complete recovery of braking energy. - Abstract: In a society characterised by increasing rates of urbanisation and growing concerns about environmental issues like climate change, urban rail transport plays a key role in contributing to sustainable development. However, in order to retain its inherent advantages in terms of energy consumption per transport capacity and to address the rising costs of energy, important energy efficiency measures have to be implemented. Given that numerous and frequent stops are a significant characteristic of urban rail, recuperation of braking energy offers a great potential to reduce energy consumption in urban rail systems. This paper presents a comprehensive overview of the currently available strategies and technologies for recovery and management of braking energy in urban rail, covering timetable optimisation, on-board and wayside Energy Storage Systems (ESSs) and reversible substations. For each measure, an assessment of their main advantages and disadvantages is provided alongside a list of the most relevant scientific studies and demonstration projects. This study concludes that optimising timetables is a preferential measure to increase the benefits of regenerative braking in any urban rail system. Likewise, it has been observed that ESSs are a viable solution to reuse regenerative energy with voltage stabilisation and energy saving purposes. Electrochemical Double Layer Capacitors has been identified as the most suitable technology for ESSs in general, although high specific power batteries such as Li-ion may become a practical option for on

  4. Transmission of Helium Isotopes through Graphdiyne Pores: Tunneling versus Zero Point Energy Effects.

    Science.gov (United States)

    Hernández, Marta I; Bartolomei, Massimiliano; Campos-Martínez, José

    2015-10-29

    Recent progress in the production of new two-dimensional (2D) nanoporous materials is attracting considerable interest for applications to isotope separation in gases. In this paper we report a computational study of the transmission of (4)He and (3)He through the (subnanometer) pores of graphdiyne, a recently synthesized 2D carbon material. The He-graphdiyne interaction is represented by a force field parametrized upon ab initio calculations, and the (4)He/(3)He selectivity is analyzed by tunneling-corrected transition state theory. We have found that both zero point energy (of the in-pore degrees of freedom) and tunneling effects play an extraordinary role at low temperatures (≈20-30 K). However, both quantum features work in opposite directions in such a way that the selectivity ratio does not reach an acceptable value. Nevertheless, the efficiency of zero point energy is in general larger, so that (4)He tends to diffuse faster than (3)He through the graphdiyne membrane, with a maximum performance at 23 K. Moreover, it is found that the transmission rates are too small in the studied temperature range, precluding practical applications. It is concluded that the role of the in-pore degrees of freedom should be included in computations of the transmission probabilities of molecules through nanoporous materials.

  5. Experiment of Power Supply Method for WLAN Sensor Using Both Energy Harvesting and Microwave Power Transmission

    International Nuclear Information System (INIS)

    Sakaguchi, K; Yamashita, S; Yamamoto, K; Nishio, T; Morikura, M; Huang, Y; Shinohara, N

    2014-01-01

    This paper proposes to improve effectiveness of supplying a sensor with energy using microwave power transmission (MPT) and energy harvesting (EH). The MPT duration should be as short as possible to avoid serious interference between the MPT and wireless local area network data transmission when co-channel operation of both microwave power transmission (MPT) and wireless data transmissions is performed. To shorten the MPT duration, we use multiple power sources such as an MPT source and an EH source to supply a sensor with power. Here, an overcharge or an energy shortage could occur at the sensor if the power supplied by both the MPT and EH sources is not adjusted appropriately. To solve this problem, the power supplied by multiple sources should be estimated precisely. In this paper, we propose a scheme for estimating the power supplied by multiple sources on the basis of an existing MPT scheduling system and then conducted an experiment using the scheme. From the experimental results, it is confirmed to estimate the power supplied by multiple sources successfully. In addition, the required MPT duration when the EH source is used is reduced compared to that when it is not used. Moreover, it is confirmed that the sensor station successfully estimates the power supplied by an MPT source and that by an EH source and adequately configures the MPT duration

  6. Optical fiber cable for transmission of high power laser energy over great distances

    Science.gov (United States)

    Zediker, Mark S.; Rinzler, Charles C.; Faircloth, Brian O.; Moxley, Joel F.; Koblick, Yeshaya

    2016-05-24

    There is provided a system and apparatus for the transmission of high power laser energy over great distances without substantial power loss and without the presence of stimulated Raman scattering. There is further provided systems and optical fiber cable configurations and optical fiber structures for the delivering high power laser energy over great distances to a tool or surface to perform an operation or work with the tool or upon the surface.

  7. 3D As-Built a documentation of the substation electrical power 400 KV; Documentacion 3D As-Built de una subestacion electrica de 400 KV

    Energy Technology Data Exchange (ETDEWEB)

    Sarti Fernandez, F.

    2011-07-01

    It's getting parameters of time, yields and products obtained, in order to have an objective reference to the possible application of this technique to substations of Red Electrica Espanola (REE).

  8. Alternatives to electricity for transmission and annual-scale firming - Storage for diverse, stranded, renewable energy resources: hydrogen and ammonia

    Energy Technology Data Exchange (ETDEWEB)

    Leighty, William

    2010-09-15

    The world's richest renewable energy resources 'of large geographic extent and high intensity' are stranded: far from end-users with inadequate or nonexistent gathering and transmission systems to deliver energy. Output of most renewables varies greatly, at time scales of seconds-seasons: energy capture assets operate at low capacity factor; energy delivery is not 'firm'. New electric transmission systems, or fractions thereof, dedicated to renewables, suffer the same low CF: substantial stranded capital assets, increasing the cost of delivered renewable-source energy. Electricity storage cannot affordably firm large renewables at annual scale. Gaseous hydrogen and anhydrous ammonia fuels can: attractive alternatives.

  9. Occupational exposure to electric and magnetic fields during work tasks at 110 kV substations in the Tampere region.

    Science.gov (United States)

    Korpinen, Leena H; Pääkkönen, Rauno J

    2010-04-01

    The occupational exposure to electric and magnetic fields during various work tasks at seven 110 kV substations in Finland's Tampere region was studied. The aim was to investigate if the action values (10 kV/m for the E-field and 500 microT for the B-field) of the EU Directive 2004/40/EC were exceeded. Electric and magnetic fields were measured during the following work tasks: (1) walking or operating devices on the ground; (2) working from a service platform; (3) working around the power transformer on the ground or using a ladder; and (4) changing a bulb from a man hoist. In work task 2 "working from a service platform" the measured electric field (maximum value 16.6 kV/m) exceeded 10 kV/m in three cases. In the future it is important to study if the limit value (10 mA/m(2)) of Directive 2004/40/EC is exceeded at 110 kV substations. The occupational 500 microT action value of the magnetic flux density field (B-field) was not exceeded in any working situation.

  10. The Role of Interconnecting Transmission Network in Energy Market Environment in Croatia

    International Nuclear Information System (INIS)

    Radmilovic, B.

    2001-01-01

    For energy market liberalisation in a small country like Croatia, it is necessary to build strong interconnecting lines to neighbouring systems. In that way it is possible to get power under favourable market conditions and also to export domestic production (especially from hydro power plants) to external markets. Geographical position of Croatia in Europe (East West, North South) is very interesting under liberalised energy market conditions. In that sense, the possibilities and role of Croatian transmission network (400 and 220 kV) for possible transits and other country needs should be analysed. (author)

  11. Mode and climatic factors effect on energy losses in transient heat modes of transmission lines

    Science.gov (United States)

    Bigun, A. Ya; Sidorov, O. A.; Osipov, D. S.; Girshin, S. S.; Goryunov, V. N.; Petrova, E. V.

    2018-01-01

    Electrical energy losses increase in modern grids. The losses are connected with an increase in consumption. Existing models of electric power losses estimation considering climatic factors do not allow estimating the cable temperature in real time. Considering weather and mode factors in real time allows to meet effectively and safely the consumer’s needs to minimize energy losses during transmission, to use electric power equipment effectively. These factors increase an interest in the evaluation of the dynamic thermal mode of overhead transmission lines conductors. The article discusses an approximate analytic solution of the heat balance equation in the transient operation mode of overhead lines based on the least squares method. The accuracy of the results obtained is comparable with the results of solving the heat balance equation of transient thermal mode with the Runge-Kutt method. The analysis of mode and climatic factors effect on the cable temperature in a dynamic thermal mode is presented. The calculation of the maximum permissible current for variation of weather conditions is made. The average electric energy losses during the transient process are calculated with the change of wind, air temperature and solar radiation. The parameters having the greatest effect on the transmission capacity are identified.

  12. A transmission power optimization with a minimum node degree for energy-efficient wireless sensor networks with full-reachability.

    Science.gov (United States)

    Chen, Yi-Ting; Horng, Mong-Fong; Lo, Chih-Cheng; Chu, Shu-Chuan; Pan, Jeng-Shyang; Liao, Bin-Yih

    2013-03-20

    Transmission power optimization is the most significant factor in prolonging the lifetime and maintaining the connection quality of wireless sensor networks. Un-optimized transmission power of nodes either interferes with or fails to link neighboring nodes. The optimization of transmission power depends on the expected node degree and node distribution. In this study, an optimization approach to an energy-efficient and full reachability wireless sensor network is proposed. In the proposed approach, an adjustment model of the transmission range with a minimum node degree is proposed that focuses on topology control and optimization of the transmission range according to node degree and node density. The model adjusts the tradeoff between energy efficiency and full reachability to obtain an ideal transmission range. In addition, connectivity and reachability are used as performance indices to evaluate the connection quality of a network. The two indices are compared to demonstrate the practicability of framework through simulation results. Furthermore, the relationship between the indices under the conditions of various node degrees is analyzed to generalize the characteristics of node densities. The research results on the reliability and feasibility of the proposed approach will benefit the future real deployments.

  13. A Transmission Power Optimization with a Minimum Node Degree for Energy-Efficient Wireless Sensor Networks with Full-Reachability

    Science.gov (United States)

    Chen, Yi-Ting; Horng, Mong-Fong; Lo, Chih-Cheng; Chu, Shu-Chuan; Pan, Jeng-Shyang; Liao, Bin-Yih

    2013-01-01

    Transmission power optimization is the most significant factor in prolonging the lifetime and maintaining the connection quality of wireless sensor networks. Un-optimized transmission power of nodes either interferes with or fails to link neighboring nodes. The optimization of transmission power depends on the expected node degree and node distribution. In this study, an optimization approach to an energy-efficient and full reachability wireless sensor network is proposed. In the proposed approach, an adjustment model of the transmission range with a minimum node degree is proposed that focuses on topology control and optimization of the transmission range according to node degree and node density. The model adjusts the tradeoff between energy efficiency and full reachability to obtain an ideal transmission range. In addition, connectivity and reachability are used as performance indices to evaluate the connection quality of a network. The two indices are compared to demonstrate the practicability of framework through simulation results. Furthermore, the relationship between the indices under the conditions of various node degrees is analyzed to generalize the characteristics of node densities. The research results on the reliability and feasibility of the proposed approach will benefit the future real deployments. PMID:23519351

  14. Transmission of wave energy through an offshore wind turbine farm

    DEFF Research Database (Denmark)

    Christensen, Erik Damgaard; Johnson, Martin; Sørensen, Ole Rene

    2013-01-01

    condition at infinity. From airborne and Satellite SAR (Synthetic Aperture Radar) a model has been derived for the change of the water surface friction C) inside and on the lee side of the offshore wind farm. The effects have been implemented in a spectral wind wave model,MIKE21 SW, and a parametric study......The transmission of wave energy passing an offshore wind farm is studied. Three effects that can change the wave field are analysed, which is the A) energy dissipation due to drag resistance, B) wave reflection/diffraction from structures, and C) the effect of a modified wind field inside...... and on the lee side of the wind farm. The drag dissipation, A), is quantified by a quadratic resistance law. The effect of B) is parameterised based on 1st order potential theory. A method to find the amount of reflected and transmitted wave energy is developed based on the panel method WAMIT™ and a radiation...

  15. Holbrook Substation Superconductor Cable System, Long Island, New York Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Maguire, James; McNamara, Joseph

    2010-06-25

    The LIPA Superconductor project broke ground on July 4, 2006, was first energized on April 22, 2008 (Earth Day) and was commissioned on June 25, 2008. Since commissioning, up until early March, 2009, there were numerous refrigeration events that impacted steady state operations. This led to the review of the alarms that were being generated and a rewrite of the program logic in order to decrease the hypersensitivity surrounding these alarms. The high temperature superconductor (HTS) cable was energized on March 5, 2009 and ran uninterrupted until a human error during a refrigeration system switchover knocked the cable out of the grid in early February 2010. The HTS cable was in the grid uninterrupted from March 5, 2009 to February 4, 2010. Although there have been refrigeration events (propagated mainly by voltage sags/surges) during this period, the system was able to automatically switch over from the primary to the backup refrigeration system without issue as required during this period. On February 4, 2010, when switching from the backup over to the primary refrigeration system, two rather than one liquid nitrogen pumps were started inadvertently by a human error (communication) causing an overpressure in the cable cooling line. This in turn activated the pressure relief valve located in the grounding substation. The cable was automatically taken out of the grid without any damage to the components or system as a result of signals sent from the AMSC control cabinet to the LIPA substation. The cable was switched back into the grid again on March 16, 2010 without incident and has been operational since that time. Since switching from the backup to the primary is not an automatic process, a recent improvement was added to the refrigeration operating system to allow remote commands to return the system from backup to primary cooling. This improvement makes the switching procedure quicker since travel to the site to perform this operation is no longer necessary and

  16. Small passenger car transmission test-Chevrolet 200 transmission

    Science.gov (United States)

    Bujold, M. P.

    1980-01-01

    The small passenger car transmission was tested to supply electric vehicle manufacturers with technical information regarding the performance of commerically available transmissions which would enable them to design a more energy efficient vehicle. With this information the manufacturers could estimate vehicle driving range as well as speed and torque requirements for specific road load performance characteristics. A 1979 Chevrolet Model 200 automatic transmission was tested per a passenger car automatic transmission test code (SAE J651b) which required drive performance, coast performance, and no load test conditions. The transmission attained maximum efficiencies in the mid-eighty percent range for both drive performance tests and coast performance tests. Torque, speed and efficiency curves map the complete performance characteristics for Chevrolet Model 200 transmission.

  17. Modeling Transient Heat Transfer in Small-Size Twin Pipes for End-User Connections to Low-Energy District Heating Networks

    DEFF Research Database (Denmark)

    Dalla Rosa, Alessandro; Li, Hongwei; Svendsen, Svend

    2013-01-01

    The low-energy district heating concept has the potential of increasing the energy and exergy efficiencies of heat supply systems and of exploiting renewable energy, provided technical solutions for its wide application can be developed and implemented. This paper investigates the dynamic behaviour...... of district heating branch pipes in low-temperature operation (supply temperature 50-55°C and return temperature 20-25°C). We looked at state-of-the-art district heating branch pipes, suitable for the connection of a typical single-family house to a substation equipped with a heat exchanger for domestic hot...... water preparation. Experimental measurements of the supply temperature profiles at the outlet of the pipe, i.e. at the inlet to the substation, were compared with detailed simulations based on the finite volume (FV) method. A programming code was developed to model these profiles, and this was validated...

  18. Numerical modelling and experimental measurements for a low-temperature district heating substation for instantaneous preparation of DHW with respect to service pipes

    DEFF Research Database (Denmark)

    Brand, Marek; Thorsen, Jan Eric; Svendsen, Svend

    2012-01-01

    Traditional district heating (DH) systems are becoming uneconomic as the number of new and renovated buildings with reduced heating requirements increases. To keep DH competitive in the future, heat losses in DH networks need to be reduced. One option is to reduce the supply temperature of DH...... as much as possible. This requires a review and improvement of a DH network, in-house substations, and the whole domestic hot water (DHW) supply system, with the focus on user comfort, hygiene, overall cost and energy efficiency. This paper describes some practical approaches to the implementation of low...... concept as well for individual components. The results show that the way that the service pipe is operated has a significant effect on waiting time for DHW, heat loss, and overall cost. Furthermore, the service pipe should be kept warm by using a bypass in order to fulfil the comfort requirements for DHW...

  19. Low-energy electron transmission and secondary-electron emission experiments on crystalline and molten long-chain alkanes

    International Nuclear Information System (INIS)

    Ueno, N.; Sugita, K.; Seki, K.; Inokuchi, H.

    1986-01-01

    This paper describes the results of low-energy electron transmission and secondary-electron emission experiments on thin films of long-chain alkanes deposited on metal substrates. The spectral changes due to crystal-melt phase transition were measured in situ in both experiments. The ground-state energy V 0 of the quasifree electron in crystalline state was determined to be 0.5 +- 0.1 eV. The value of V 0 for the molten state was found to be negative. Further, in the crystalline state evidence is found for a direct correspondence between the transmission maxima and the high value of the density of states in the conduction bands

  20. Energy-Efficient Resource and Power Allocation for Underlay Multicast Device-to-Device Transmission

    Directory of Open Access Journals (Sweden)

    Fan Jiang

    2017-11-01

    Full Text Available In this paper, we present an energy-efficient resource allocation and power control scheme for D2D (Device-to-Device multicasting transmission. The objective is to maximize the overall energy-efficiency of D2D multicast clusters through effective resource allocation and power control schemes, while considering the quality of service (QoS requirements of both cellular users (CUs and D2D clusters. We first build the optimization model and a heuristic resource and power allocation algorithm is then proposed to solve the energy-efficiency problem with less computational complexity. Numerical results indicate that the proposed algorithm outperforms existing schemes in terms of throughput per energy consumption.

  1. N. E. L. Floating Terminator. Volume 3C(NFT) - Technical appraisal. Consultants' 1983 report

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    A report is given by a team of Consultants on the estimated cost of converting wave energy into electrical energy by a 2 GW array of NEL Floating Terminator Devices and delivering the electricity to a sub-station on the west coast of Skye. A detailed engineering assessment is given. Comparisons with the estimates made by the team developing the concept are presented and discrepancies discussed. The main cost differences are caused by the different assessments of the power conversion efficiency and the electrical transmission costs.

  2. Cross-Country Electricity Trade, Renewable Energy and European Transmission Infrastructure Policy

    OpenAIRE

    Abrell, Jan; Rausch, Sebastian

    2016-01-01

    This paper develops a multi-country multi-sector general equilibrium model, integrating high-frequency electricity dispatch and trade decisions, to study the e ects of electricity transmission infrastructure (TI) expansion and re- newable energy (RE) penetration in Europe for gains from trade and carbon dioxide emissions in the power sector. TI can bene t or degrade environ- mental outcomes, depending on RE penetration: it complements emissions abatement by mitigating dispatch problems associ...

  3. Study of a conceptual nuclear energy center at Green River, Utah. Power demand, load center assessment and transmission

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D.R.; Thaik, A.; Pingel, P.

    1982-02-01

    This document constitutes a segment of a feasibility study investigating the ramification of constructing a nuclear energy center in an arid western region. In this phase of the study. The projected power demands and load center locations were reviewed and assessed. Alternative transmission systems were analysed and a conceptual transmission for bulk power transportation is proposed with potential line routes. Environmental impacts of the proposed transmission were also identified.

  4. Study of a conceptual nuclear energy center at Green River, Utah. Power demand, load center assessment and transmission

    International Nuclear Information System (INIS)

    Smith, D.R.; Thaik, A.; Pingel, P.

    1982-02-01

    This document constitutes a segment of a feasibility study investigating the ramification of constructing a nuclear energy center in an arid western region. In this phase of the study. The projected power demands and load center locations were reviewed and assessed. Alternative transmission systems were analysed and a conceptual transmission for bulk power transportation is proposed with potential line routes. Environmental impacts of the proposed transmission were also identified

  5. Meeting the energy demand of high load density areas

    International Nuclear Information System (INIS)

    Rillo, Carlos O.

    1997-01-01

    Due to the high cost of land and in some places, unavailability of land, the existing standard substation of Meralco (Manila Electric Company) can no longer be used in many places of Metro Manila. To cope with this problem, the GIS (Gas Insulated System) substation is now being resorted to. There are various schemes of developing a GIS substation, each fitted to certain particular conditions. Cost implications and design considerations were also briefly discussed. (author)

  6. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  7. Regional Transmission Projects: Finding Solutions

    Energy Technology Data Exchange (ETDEWEB)

    The Keystone Center

    2005-06-15

    The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association

  8. Grassroots Technological Resistance: The People's Power Project and the Impossible Dream of Wireless Transmission of Energy.

    Science.gov (United States)

    Schmidt, Pete

    2017-09-01

    In 1972, the Minnesota United Power Association (UPA) teamed up with the Minnesota Cooperative Power Association (CPA) to initiate an electrification project designed to bring power from North Dakota to the Twin Cities area. A significant backlash and protest began once farmers across the state became aware of the plan and the potential impending land seizure. In the midst of these actions, one group sought to create an alternative to the power line transmission system by designing a system of wireless energy transmission based on the plans of Nikola Tesla. This self-funded conglomeration of farmers and amateur researchers formed the People's Power Project (PPP) and set about building Tesla's system for the wireless transmission of energy. Using archival documents, this paper recounts this episode and argues that, in this case, the potential for successful grassroots action was derailed by the influence of longstanding myths about Tesla and his devices. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. McCullough to Liberty fiber optics project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    The US Department of Energy, Western Area Power Administration (Western) proposes to replace an existing overhead static wire with a shield wire that contains optical fibers (OPGW) on transmission lines from McCullough Substation, south of Las Vegas, Nevada, to Liberty Substation near Phoenix, Arizona. The replacement will occur on the McCullough-Davis, Davis-Parker No. 2, and Parker-Liberty No. 1 230-kV transmission lines. Western is responsible for the operation and maintenance of the lines. Western prepared an Environmental Assessment (EA) entitled ``McCullough to Liberty Fiber Optics Project`` (DOE/EA-1202). The EA contains the analysis of the proposed construction, operation, and maintenance of the OPGW. Based on the analysis in the EA, Western finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. The preparation of an environmental impact statement (EIS) is not required, and therefore, Western is issuing this Findings of No Significant Impact (FONSI).

  10. McCullough to Liberty fiber optics project

    International Nuclear Information System (INIS)

    1997-05-01

    The US Department of Energy, Western Area Power Administration (Western) proposes to replace an existing overhead static wire with a shield wire that contains optical fibers (OPGW) on transmission lines from McCullough Substation, south of Las Vegas, Nevada, to Liberty Substation near Phoenix, Arizona. The replacement will occur on the McCullough-Davis, Davis-Parker No. 2, and Parker-Liberty No. 1 230-kV transmission lines. Western is responsible for the operation and maintenance of the lines. Western prepared an Environmental Assessment (EA) entitled ''McCullough to Liberty Fiber Optics Project'' (DOE/EA-1202). The EA contains the analysis of the proposed construction, operation, and maintenance of the OPGW. Based on the analysis in the EA, Western finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. The preparation of an environmental impact statement (EIS) is not required, and therefore, Western is issuing this Findings of No Significant Impact (FONSI)

  11. A Review on Development Practice of Smart Grid Technology in China

    Science.gov (United States)

    Han, Liu; Chen, Wei; Zhuang, Bo; Shen, Hongming

    2017-05-01

    Smart grid has become an inexorable trend of energy and economy development worldwide. Since the development of smart grid was put forward in China in 2009, we have obtained abundant research results and practical experiences as well as extensive attention from international community in this field. This paper reviews the key technologies and demonstration projects on new energy connection forecasts; energy storage; smart substations; disaster prevention and reduction for power transmission lines; flexible DC transmission; distribution automation; distributed generation access and micro grid; smart power consumption; the comprehensive demonstration of power distribution and utilization; smart power dispatching and control systems; and the communication networks and information platforms of China, systematically, on the basis of 5 fields, i.e., renewable energy integration, smart power transmission and transformation, smart power distribution and consumption, smart power dispatching and control systems and information and communication platforms. Meanwhile, it also analyzes and compares with the developmental level of similar technologies abroad, providing an outlook on the future development trends of various technologies.

  12. Stationary centrifugal mass energy storage at the Hamburg subway; Stationaerer Schwungmassen-Energiespeicher bei der Hamburger U-Bahn

    Energy Technology Data Exchange (ETDEWEB)

    Steinhorst, F. [Hamburger Hochbahn AG, Hamburg (Germany). Abt. Energieanlagen; Jonassen, I.; Peters, A. [Hamburger Hochbahn AG, Hamburg (Germany). Fachbereich Energieversorgung

    2008-07-01

    A stationary energy storage is to be used as a model in a substation of the Hamburg subway network with a view to the environmentally compatible and technically proper use of the brake energy available in electrified local public transport systems. A further question to be reviewed is whether the use of other energy storages in the subway network is a reasonable solution. (orig.)

  13. 76 FR 12955 - CenterPoint Energy Gas Transmission Company, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2011-03-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-78-000] CenterPoint Energy Gas Transmission Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Line AM- 46 Replacement Project, Request for Comments on Environmental Issues, and Notice of Onsite Environmental Review The staff of the...

  14. Sitting duck or wise old owl. [electricity generation and transmission and public relations

    Energy Technology Data Exchange (ETDEWEB)

    Rappoport, D.M.

    1993-02-15

    Utilities are building few generating stations these days, but modest customer growth means that transmission and distribution facilities must be built or rebuilt in the coming years. This means a customer typically opposing a construction project is likely to be a suburbanite worried about the effect a distribution or transmission line or substation may have on home values as well as the potential health risks posed by that facility. Those worried about the prospect of falling home prices or potential health risks have the motivation and the means to make life difficult for utilities that don't understand how the rules of the game have changed. While the profile of the protestors has changed in recent years, the views of many utility executives have not. Too many still believe the public can be ignored when it comes to siting facilities or structuring rates. Utilities will spend mightily to mollify the public after it becomes angry. But it would be less costly - and more productive - to invest in advance in an ongoing program to help avoid an angry public. If that approach is successful, those in media and government relations will find they have fewer brushfires.

  15. Improved Performance of Connected Foundations for Resilient Energy Transmission Infrastructure in Soft Soils

    Directory of Open Access Journals (Sweden)

    Doohyun Kyung

    2015-12-01

    Full Text Available The connected foundation is an effective structural type of foundation that can improve the sustainability of electrical transmission towers in soft soils to serve as a resilient energy supply system. In this study, the performance of electrical transmission towers reinforced with connected beams was investigated using a series of field load tests. Model transmission tower structures were manufactured and adopted into the tests. Based on the load capacity mobilization and failure mechanism, a criterion to define the load carrying capacity for connected foundation was proposed. It was found that the performance of connected foundation varies with the mechanical property of connection beam. The load capacity and differential settlement increased and decreased, respectively, with increasing connection beam stiffness. Such effect of connection beam was more pronounced as the height of load application point or tower height (zh increases. Based on the load test results, a design model was proposed that can be used to evaluate the sustainable performance and load carrying capacity of connected foundations. Field load tests with prototype transmission tower structure models were conducted to check and confirm the performance of connected foundation and the proposed design method.

  16. EUROPE AND BEYOND: THE DEVELOPMENT OF SUB-STATE PARADIPLOMACY WITH SPECIAL REFERENCE TO CATALONIA

    Directory of Open Access Journals (Sweden)

    Gary CHAMBERS

    2012-12-01

    Full Text Available This article will argue that the locus of effective political power is no longer monopolised by national governments but is effectively distributed between national, regional and international levels. Subnational governments are no longer minor actors in the area of intergovernmental collaboration. This article will explore the phenomenon of substate paradiplomacy in order to highlight the transformation of the European nation-state as a result of the combined forces of globalisation and regionalisation. It seems likely in the Catalan case that the regional government is attempting to raise its international profile while ensuring that its promotion of Catalan interests on the EU and international level does not conflict with those of Spain.

  17. Study on ventilation and noise reduction in the main transformer room in indoor substation

    Directory of Open Access Journals (Sweden)

    Hu Sheng

    2016-01-01

    Full Text Available The noise emission should be considered in the ventilation and cooling design for the main transformer room of indoor substation. In this study, based on Soundplan software, effects of four common ventilation and cooling schemes on the cooling and sound insulation were compared. The research showed that the region with low noise requirement, the ventilation could be set on the outer wall or on the door of the main transformer room, while the region with high noise requirement, air inlet muffler or ventilation through the cable interlayer under the main transformer room must be used. All of the four kinds of ventilation schemes, ventilation through the cable interlayer is the best in cooling and noise reduction.

  18. Analysis, simulation and control of electromagnetic transients in gas insulated substations in SF6 by means of grounding grid; Analisis, simulacion y control de transitorios electromagneticos en subestaciones aisladas en SF6 por medio de redes de tierra

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez Martinez, Gaston

    2007-12-15

    The use of SF6 substations is actually an extensive practice in industrial countries. Some of they replace conventional air substations and the others are new designs in the range of 34.5 kV to 1000 kV. During the switching events in a GIS substation, very fast transients overvoltage may appear and originate faults, malfunctions in the electronic and control equipment, besides the risk by electrical discharge in the personnel who are working in the substation. These overvoltage are produced by the collapse of the electric field on GIS terminals during switching events originating Very Fast Transient Overvoltage (VFTO) and the increase of the Transient Enclosure Voltage (TEV). This investigation is focused on diminishing the magnitude of the VFTO and TEV by designing and redesigning grounding grids for gas insulated substations in SF6. The objective of this work is to design a grounding grid for an air substation and redesign it for a GIS substation. The computer simulation uses a detailed model of the substation in SF6 interconnected with an aerial grounding grid and by adding methodologically grounding rods, the VFTO and TEV within the GIS are reduced. The results of the computer simulation show that the designed grounding grid allows considerably diminishing the magnitude of the VFTO; nevertheless this design doesn't appropriately attenuate the TEV magnitude. [Spanish] Hoy en dia, el uso de subestaciones GIS se ha generalizado. Algunas reemplazan a las subestaciones aereas y otras son de nueva creacion y se instalan en tensiones de 34.5kV hasta 1000 kV. Durante las operaciones de maniobra de la subestacion GIS, se presentan sobretensiones transitorias ultra rapidas que pueden dar origen a diversas fallas, a un malfuncionamiento del equipo electronico y de control asi como el riesgo por descarga electrica al personal que labora en la subestacion. Estas sobretensiones se producen debido al colapso del campo electrico en terminales del interruptor ante

  19. Numerical study of influence of different dispersed components of crystal cloud on transmission of radiant energy

    Science.gov (United States)

    Shefer, Olga

    2017-11-01

    The calculated results of the transmission of visible and infrared radiation by an atmosphere layer involving ensembles of large preferentially oriented crystals and spherical particles are presented. To calculate extinction characteristics, the physical optics method and the Mie theory are applied. Among all atmospheric particles, both the small particles that are commensurable with the wavelength of the incident radiation and the large plates and the columns are distinguished by the most pronounced dependence of the transmission on spectra of radiant energy. The work illustrates features of influence of parameters of the particle size distribution, particle aspect ratios, orientation and particle refractive index, also polarization state of the incident radiation on the transmission. The predominant effect of the plates on the wavelength dependence of the transmission is shown. A separated and cooperative contributes of the large plates and the small volume shape particles to the common transmission by medium are considered.

  20. Energy-Efficient Transmissions for Remote Wireless Sensor Networks: An Integrated HAP/Satellite Architecture for Emergency Scenarios.

    Science.gov (United States)

    Dong, Feihong; Li, Hongjun; Gong, Xiangwu; Liu, Quan; Wang, Jingchao

    2015-09-03

    A typical application scenario of remote wireless sensor networks (WSNs) is identified as an emergency scenario. One of the greatest design challenges for communications in emergency scenarios is energy-efficient transmission, due to scarce electrical energy in large-scale natural and man-made disasters. Integrated high altitude platform (HAP)/satellite networks are expected to optimally meet emergency communication requirements. In this paper, a novel integrated HAP/satellite (IHS) architecture is proposed, and three segments of the architecture are investigated in detail. The concept of link-state advertisement (LSA) is designed in a slow flat Rician fading channel. The LSA is received and processed by the terminal to estimate the link state information, which can significantly reduce the energy consumption at the terminal end. Furthermore, the transmission power requirements of the HAPs and terminals are derived using the gradient descent and differential equation methods. The energy consumption is modeled at both the source and system level. An innovative and adaptive algorithm is given for the energy-efficient path selection. The simulation results validate the effectiveness of the proposed adaptive algorithm. It is shown that the proposed adaptive algorithm can significantly improve energy efficiency when combined with the LSA and the energy consumption estimation.

  1. Energy-Efficient Transmissions for Remote Wireless Sensor Networks: An Integrated HAP/Satellite Architecture for Emergency Scenarios

    Science.gov (United States)

    Dong, Feihong; Li, Hongjun; Gong, Xiangwu; Liu, Quan; Wang, Jingchao

    2015-01-01

    A typical application scenario of remote wireless sensor networks (WSNs) is identified as an emergency scenario. One of the greatest design challenges for communications in emergency scenarios is energy-efficient transmission, due to scarce electrical energy in large-scale natural and man-made disasters. Integrated high altitude platform (HAP)/satellite networks are expected to optimally meet emergency communication requirements. In this paper, a novel integrated HAP/satellite (IHS) architecture is proposed, and three segments of the architecture are investigated in detail. The concept of link-state advertisement (LSA) is designed in a slow flat Rician fading channel. The LSA is received and processed by the terminal to estimate the link state information, which can significantly reduce the energy consumption at the terminal end. Furthermore, the transmission power requirements of the HAPs and terminals are derived using the gradient descent and differential equation methods. The energy consumption is modeled at both the source and system level. An innovative and adaptive algorithm is given for the energy-efficient path selection. The simulation results validate the effectiveness of the proposed adaptive algorithm. It is shown that the proposed adaptive algorithm can significantly improve energy efficiency when combined with the LSA and the energy consumption estimation. PMID:26404292

  2. Energy-Efficient Transmissions for Remote Wireless Sensor Networks: An Integrated HAP/Satellite Architecture for Emergency Scenarios

    Directory of Open Access Journals (Sweden)

    Feihong Dong

    2015-09-01

    Full Text Available A typical application scenario of remote wireless sensor networks (WSNs is identified as an emergency scenario. One of the greatest design challenges for communications in emergency scenarios is energy-efficient transmission, due to scarce electrical energy in large-scale natural and man-made disasters. Integrated high altitude platform (HAP/satellite networks are expected to optimally meet emergency communication requirements. In this paper, a novel integrated HAP/satellite (IHS architecture is proposed, and three segments of the architecture are investigated in detail. The concept of link-state advertisement (LSA is designed in a slow flat Rician fading channel. The LSA is received and processed by the terminal to estimate the link state information, which can significantly reduce the energy consumption at the terminal end. Furthermore, the transmission power requirements of the HAPs and terminals are derived using the gradient descent and differential equation methods. The energy consumption is modeled at both the source and system level. An innovative and adaptive algorithm is given for the energy-efficient path selection. The simulation results validate the effectiveness of the proposed adaptive algorithm. It is shown that the proposed adaptive algorithm can significantly improve energy efficiency when combined with the LSA and the energy consumption estimation.

  3. High Voltage Power Transmission for Wind Energy

    Science.gov (United States)

    Kim, Young il

    The high wind speeds and wide available area at sea have recently increased the interests on offshore wind farms in the U.S.A. As offshore wind farms become larger and are placed further from the shore, the power transmission to the onshore grid becomes a key feature. Power transmission of the offshore wind farm, in which good wind conditions and a larger installation area than an onshore site are available, requires the use of submarine cable systems. Therefore, an underground power cable system requires unique design and installation challenges not found in the overhead power cable environment. This paper presents analysis about the benefit and drawbacks of three different transmission solutions: HVAC, LCC/VSC HVDC in the grid connecting offshore wind farms and also analyzed the electrical characteristics of underground cables. In particular, loss of HV (High Voltage) subsea power of the transmission cables was evaluated by the Brakelmann's theory, taking into account the distributions of current and temperature.

  4. Introduction to SCADA Protection and Vulnerabilities

    Energy Technology Data Exchange (ETDEWEB)

    Ken Barnes; Briam Johnson; Reva Nickelson

    2004-03-01

    Even though deregulation has changed the landscape of the electric utility industry to some extent, a typical large electric utility still owns power generation facilities, power transmission and distribution lines, and substations. Transmission and distribution lines form the segments or spokes of a utility’s grid. Power flow may change through these lines, but control of the system occurs at the nodes of the grid, the generation facilities, and substations. This section discusses each of these node types in more detail as well as how each is controlled.

  5. Parametric study of variable renewable energy integration in Europe: Advantages and costs of transmission grid extensions

    International Nuclear Information System (INIS)

    Schaber, Katrin; Steinke, Florian; Mühlich, Pascal; Hamacher, Thomas

    2012-01-01

    Wind and solar energy will play an important role in the decarbonization of the European electricity generation. However, high shares of these variable renewable energies (VREs) challenge the power system considerably due to their temporal fluctuations and geographical dispersion. In this paper, we systematically analyze transmission grid extensions as an integration measure for VREs in Europe. We show the effects of grid extensions for fundamental properties of the power system as a function of the penetration and mix of wind and solar energy. Backup capacity requirements and overproduction are reduced with a powerful overlay transmission grid. We determine the costs of the grid extensions in dependence of the VRE penetration and mix and find that the grid integration costs remain below 25% of the VRE investment costs for all conceivable VRE configurations. Furthermore, robust design features of future power systems in terms of grid geometry and flexibility requirements for backup technologies are identified. We apply a spatially and temporally highly resolved techno-economic model of the European power system for our analysis. - Highlights: ► Quantification of the advantages and costs of a European overlay transmission grid. ► Grid integration costs for VREs in Europe remain below 6€/MWh. ► Application of a detailed power system model to a wide parameter space.

  6. Power transmission study for a wave energy scheme based on Lancaster Flexible Bag devices. Supervisory and telecontrol system

    Energy Technology Data Exchange (ETDEWEB)

    1981-11-01

    Various options are considered for power data transmission associated with the power collection and transmission system of a postulated wave energy conversion scheme off the Outer Hebrides. For data transmission between the off-shore and on-shore power collector stations a Power Line Carrier (PLC) system is judged to be most suitable. In the case of data transmission between power collector stations and the main control centre, a microwave/radio link is proposed as the amount of data does not lend itself to a PLC system. Cost estimates, in the main for equipment supply only, are given.

  7. Overview on the electric power in june 2003

    International Nuclear Information System (INIS)

    2003-01-01

    This document aims to give information on the exploitation of the transmission public network and the french electric power industry during june 2003: the internal electric power consumption in France (national consumption is the total of all the electrical energy supplied for consumption in France (including Corsica, but not the French Overseas Departments), thermal and hydro generation + imports - exports - pumping, and which have been consumed in the transmission and distribution networks, by the end-users, as well as by losses) - national consumption in June 2003 has risen by 1.8% compared with that of June 2002. The June average temperature which has been 2.9 deg. C higher in 2003 than in June 2002 has resulted in consumption linked to higher use of air-conditioning. Adjusted for climatic effects, monthly consumption has increased by 1.3% compared with June 2002. The consumption growth rate adjusted over 12 months has fallen by 0.1% since last month, whereas the national consumption growth rate over the last 12 months has remained stable; the energy accounting from the transmission point of view (the balance recorded by RTE takes into account only the energy physical flows conveyed on the RTE network) - in June 2003, consumption has increased compared with June 2002, whereas exports have fallen by 0.3 TWh. The overall volume of injections has risen by 0.2 TWh. This month, hydro generation is down by 0.8 TWh due to inflows being 25% lower than in June 2002, whereas thermal generation is up by 0.3 TWh. Imports are up by around 0.7 TWh; the consumption and the physical exchanges (these values reflect all of the flows on the RTE network, as well as the generation auto-consumed by the industrial consumers connected to this network); the electric power market: the market players, contractual exchanges recorded by RTE contracts for access to international connections, contractual exchanges by border; and the evolution of the transmission network - the following

  8. Common raven occurrence in relation to energy transmission line corridors transiting human-altered sagebrush steppe

    Science.gov (United States)

    Coates, Peter S.; Howe, Kristy B.; Casazza, Michael L.; Delehanty, David J.

    2014-01-01

    Energy-related infrastructure and other human enterprises within sagebrush steppe of the American West often results in changes that promote common raven (Corvus corax; hereafter, raven) populations. Ravens, a generalist predator capable of behavioral innovation, present a threat to many species of conservation concern. We evaluate the effects of detailed features of an altered landscape on the probability of raven occurrence using extensive raven survey (n= 1045) and mapping data from southern Idaho, USA. We found nonlinear relationships between raven occurrence and distances to transmission lines, roads, and facilities. Most importantly, raven occurrence was greater with presence of transmission lines up to 2.2 km from the corridor.We further explain variation in raven occurrence along anthropogenic features based on the amount of non-native vegetation and cover type edge, such that ravens select fragmented sagebrush stands with patchy, exotic vegetative introgression. Raven occurrence also increased with greater length of edge formed by the contact of big sagebrush (Artemisia tridentate spp.) with non-native vegetation cover types. In consideration of increasing alteration of sagebrush steppe, these findings will be useful for planning energy transmission corridor placement and other management activities where conservation of sagebrush obligate species is a priority.

  9. Modeling and Characteristic Analysis of Wireless Ultrasonic Vibration Energy Transmission Channels through Planar and Curved Metal Barriers

    Directory of Open Access Journals (Sweden)

    DingXin Yang

    2018-01-01

    Full Text Available Wireless ultrasonic vibration energy transmission systems through metal barriers based on piezoelectric transducers have drawn a lot of focus due to the advantage of nonpenetration of the barriers, thus maintaining the integrity of sealed structures. It is meaningful to investigate appropriate modeling methods and to characterize such wireless ultrasonic energy transmission channels with different geometric shapes. In this paper, equivalent circuit modeling and finite element modeling methods are applied to the planar metal barrier channel, and a 3-dimensional finite element modeling method is applied to the cylindrical metallic barrier channel. Meanwhile, the experimental setup is established and measurements are carried out to validate the effectiveness of the corresponding modeling methods. The results show that Leach’s equivalent circuit modeling method and finite element modeling method are nearly similarly effective in characterizing the planar metal barrier channel. But for a cylindrical metal barrier, only the three-dimensional finite element modeling method is effective. Furthermore, we found that, for the planar barrier, the effect of standing waves on the efficiency of wireless energy transmission is dominated. But for the curved barrier, only the resonant phenomenon of the piezoelectric transducer exists.

  10. Probabilistic methodology for determining the optimum number of stand-by transformers in distribution substations; Metodologia probabilistica para determinacao do numero otimo de transformadores reservas em subestacoes de distribuicao

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Joao Guilherme de C.; Silva, Armando M. Leite da [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Inst. de Sistemas Eletricos e Energia], Emails: costa@unifei.edu.br, armando@unifei.edu.br

    2009-07-01

    A new probabilistic methodology for determining the optimum number of stand-by transformers in distribution substations is presented. The calculus has three steps: reliability evaluation of a transformer system with a stand-by stock; calculus of investment and operation costs for different composition alternatives of stock; identification of the number of stand-by transformers, which minimizes the total cost. Concerning the the step 1, the operative states of the system are represented by a Markov process, where it is possible to calculate indicators as probability, frequency and average duration of failure, as well as to estimate average values of no-supplied energy and costs. The proposed methodology is applied to a 72 kV transformer system and the obtained results are discussed in details.

  11. Evaluation of sub-soil geo-electric properties in a proposed power sub-station site at Ebubu, Rivers State, Nigeria

    OpenAIRE

    T.K.S. Abam; S.A. Ngah

    2014-01-01

    Electrical resistivity survey was carried out in a site proposed for the construction and installation of a Power sub-station. The project will involve subsurface installation of cables and other objects that easily conduct electricity. Extant laws including EIA also require knowledge of subsurface distribution of resistivity in construction projects that would involve burial of steel pipes and cables. The imperative of this is emphasized by the location of the project in an area of shallow g...

  12. Accounting-related transmission issues

    International Nuclear Information System (INIS)

    Niehaus, M.; Bjorn, P.; Pate, G.

    1999-01-01

    Various initiatives have been undertaken by the Federal Energy Regulatory Commission (FERC) to deregulate wholesale electric energy markets. These initiatives have focused on restructuring the transmission systems in the US and recently have culminated in a proposal requiring formation of and participation in regional transmission organizations. The overall form of regulation selected to determine rates for transmission entities as well as underlying regulatory decisions reached on key issues will have profound implications for transmission entities. For example, traditional cost-based regulation would require one set of accounting and reporting rules, while incentive-based regulation may not be subject to those same rules. An overview of some of the major accounting and financial reporting issues that will need to be considered is presented

  13. Nanoscale Energy-Filtered Scanning Confocal Electron Microscopy Using a Double-Aberration-Corrected Transmission Electron Microscope

    International Nuclear Information System (INIS)

    Wang Peng; Behan, Gavin; Kirkland, Angus I.; Nellist, Peter D.; Takeguchi, Masaki; Hashimoto, Ayako; Mitsuishi, Kazutaka; Shimojo, Masayuki

    2010-01-01

    We demonstrate that a transmission electron microscope fitted with two spherical-aberration correctors can be operated as an energy-filtered scanning confocal electron microscope. A method for establishing this mode is described and initial results showing 3D chemical mapping with nanoscale sensitivity to height and thickness changes in a carbon film are presented. Importantly, uncorrected chromatic aberration does not limit the depth resolution of this technique and moreover performs an energy-filtering role, which is explained in terms of a combined depth and energy-loss response function.

  14. An energy saving mechanism of EPON networks for real time video transmission

    Science.gov (United States)

    Liu, Chien-Ping; Wu, Ho-Ting; Chiang, Yun-Ting; Chien, Shieh-Chieh; Ke, Kai-Wei

    2015-07-01

    Modern access networks are constructed widely by passive optical networks (PONs) to meet the growing bandwidth demand. However, higher bandwidth means more energy consumption. To save energy, a few research works propose the dual-mode energy saving mechanism that allows the ONU to operate between active and sleep modes periodically. However, such dual-mode energy saving design may induce unnecessary power consumption or packet delay increase in the case where only downstream data exist for most of the time. In this paper, we propose a new tri-mode energy saving scheme for Ethernet PON (EPON). The new tri-mode energy saving design, combining the dual-mode saving mechanism with the doze mode, allows the ONU to switch among these three modes alternatively. In the doze mode, the ONU may receive downstream data while keeping its transmitter close. Such scenario is often observed for real time video downstream transmission. Furthermore, the low packet delay of high priority upstream data can be attained through the use of early wake-up mechanism employed in both energy saving modes. The energy saving and system efficiency can thus be achieved jointly while maintaining the differentiated QoS for data with various priorities. Performance results via simulation have demonstrated the effectiveness of such mechanism.

  15. the use of artificial the use of artificial neural networks in the ...

    African Journals Online (AJOL)

    eobe

    Test results are simulated and generated in MATLAB using Apo 132KV transmission line in Apo transmission substation ... lines includes methods based on monitoring power frequency .... scenarios in order to get various fault patterns. The.

  16. Voluntary transmission access: The PSI proposal

    International Nuclear Information System (INIS)

    Norris, J.E.

    1990-01-01

    This article examines a proposal from PSI Energy, Inc. (formerly Public Service Company of Indiana) to allow open access to its power transmission facilities and the response of the Federal Energy Regulatory Commission's response to that proposal. The topics discussed include transmission tariffs, competition, market share, expansion of transmission capacity and its funding, and reciprocal agreements to provide similar service

  17. Joint HVAC transmission EMF environmental study

    Energy Technology Data Exchange (ETDEWEB)

    Stormshak, F.; Thompson, J. (Oregon State Univ., Corvallis, OR (United States))

    1992-05-01

    This document describes the rationale, procedures, and results of a carefully controlled study conducted to establish whether chronic exposure of female (ewe) Suffolk lambs to the environment of a 500-kV 60-Hz transmission line would affect various characteristics of growth, endocrine function, and reproductive development. This experiment used identical housing and management schemes for control and line-exposed ewes, thus minimizing these factors as contributors to between-group experimental error. Further, throughout the 10-month duration of this study, changes in electric and magnetic fields, audible noise, and weather conditions were monitored continuously by a computerized system. Such measurements provided the opportunity to identify any relationship between environmental factors and biological responses. Because of reports in the literature that electric and magnetic fields alter concentrations of melatonin in laboratory animals, the primary objective of this study was to ascertain whether a similar effect occurs in lambs exposed to a 500-kV a-c line in a natural setting. In addition, onset of puberty, changes in body weight, wool growth, and behavior were monitored. To determine whether the environment of a 500-kV line caused stress in the study animals, serum levels of cortisol were measured. The study was conducted at Bonneville Power Administration's Ostrander Substation near Estacada, Oregon.

  18. Modern Risk Assessment for Nuclear Power Plants High-Voltage Substations

    International Nuclear Information System (INIS)

    Ioan, S.; Hurdubetiu, S.; Marza, F.; Mocanu, M.; Stefan, M.

    2002-01-01

    The paper describes a first Romanian attempt to set up the methodology for risk assessment and control within high-voltage substations, developed for the Nuclear power plant in Cernavoda (Romania). Considering the present risk assessment methods the MENER Project will develop a new methodology, in line with the European Community legislation and with the specific regional needs. In order to correctly shape the necessary resources required by a risk analysis a large size enterprise (a nuclear power plant) is selected and the following five indicators will be estimated: the economic profit, environmental risk, indirect (future) risk, technology improvement and physic and psychological risk. The results are expected to considerably facilitate risk assessment, by: evaluating project acceptability; evaluating equipment compliance to regulatory criteria; estimating excluding clearances; easing the design of emergency programmes; identifying the equipment use restrictions; identifying the risk sources; selecting the maintenance and risk reduction methods; testing the procedures leading to future regulatory norms; suitability of the risk management system modification. The immediate result of employing modern risk assessment methods could be the decrease by one third of the expenses required by environment protection, staff health and labor safety and quality management. (author)

  19. Simulation calculation for the energy deposition profile and the transmission fraction of intense pulsed electron beam at various incident angles

    International Nuclear Information System (INIS)

    Yang Hailiang; Qiu Aici; Zhang Jiasheng; Huang Jianjun; Sun Jianfeng

    2002-01-01

    The incident angles have a heavy effect on the intense pulsed electron beam energy deposition profile, energy deposition fraction and beam current transmission fraction in material. The author presents electron beam energy deposition profile and energy deposition fraction versus electron energy (0.5-2.0 MeV), at various incident angles for three aluminum targets of various thickness via theoretical calculation. The intense pulsed electron beam current transmission fractions versus electron energy (0.4-1.4 MeV) at various incident angles for three thickness of carbon targets were also theoretically calculated. The calculation results indicate that the deposition energy in unit mass of material surface layer increase with the rise of electron beam incident angle, and electron beam with low incident angle (closer to normal incident angle) penetrates deeper into the target material. The electron beams deposit more energy in unit mass of material surface layer at 60 degree-70 degree incident angle

  20. Response analysis and energy transmissibility of a vibration isolation system with real-power nonlinearities under a NMPPF controller

    International Nuclear Information System (INIS)

    Huang, Dongmei; Xu, Wei; Shi, Lingling

    2016-01-01

    Highlights: • The nonlinear modified positive position feedback (NMPPF) scheme and the real-power form of restoring and damping forces are combined to improve the response performance of a vibration isolation system. • The primary resonance, dynamical stability and energy transmissibility of the real-power vibration isolation system are studied. • The sensitivity of the controller parameters on the responses has been analyzed. • In order to suppress the amplitude peak, the feedback parameters have been determined by the frequency response. • The energy transmissibility is investigated. - Abstract: In this paper, the nonlinear modified positive position feedback (NMPPF) scheme and the real-power form of restoring and damping forces are combined to improve the response performance of a vibration isolation system. Based on the method of multiple scales, the frequency response, the stability and the energy transmissibility of the real-power vibration isolation system are studied. It is found that the controlled isolation system exhibits a softening behavior for sub-linear restoring force, while it exhibits the two peak response characteristic rather than a hardening behavior for over-linear restoring force. Further, the sensitivity of the feedback parameters on the responses is discussed. The results, compared to the conventional PPF and IRC methods, show that the proposed method is significantly more effective in controlling the steady-state response, and slightly advantageous for the steady-state dynamics control. The effectiveness of this method is also verified by time domain analysis. Then, the suitable feedback and controller parameters are derived by simulation results in which the amplitude peak is suppressed and the resonance stability is maintained. Finally, the energy transmissibility of the vibration isolation system is investigated. The results show that the feedback gain can reduce the whole transmissibility level and greatly suppress vibration

  1. Economics and a novel voltage conversion technique associated with exporting Wyoming's energy by HVDC transmission

    Science.gov (United States)

    Xu, Kaili

    Wyoming is by far the largest coal producing state in the US, but local utilization is extremely low. As much as 92% of Wyoming's coal is shipped to the other states and is mainly consumed by their electricity producers. Coal accounts for more than 50% of the US electricity generation and is one of the least expensive energy sources. Wyoming could utilize its coal better by exporting electricity instead of exporting the coal only in its raw form. Natural gas is another important energy resource in Wyoming but local utilization is even lower. As a result of the development in coalbed methane fields, natural gas production in Wyoming is almost in pace with its coal production. In addition to constructing more new pipelines, new transmission lines should be considered as an alternative way of exporting this energy. Because of their enormous electricity market sizes and high electricity prices, California, Texas and Illinois are chosen to be the target markets for Wyoming's electricity. The proposed transmission schemes use High Voltage DC (HVDC) lines, which are suitable for long distance and cross-system power transmission. Technical and economic feasibilities are studied in details. The Wyoming-California scheme has a better return of investment than both the Wyoming-Texas and the Wyoming-Illinois schemes. A major drawback of HVDC transmission is the high level of harmonics generated by the converters. Elaborate filtering is required at both the AC and the DC sides. A novel pulse-multiplication method is proposed in the thesis to reduce the harmonics from the converter source. By introducing an averaging inductor, the proposed method uses less thyristors to achieve the same high-pulse operation as the existing series scheme. The reduction of thyristors makes the switching circuit more reliable and easier to control and maintain. Harmonic analysis shows that the harmonic level can be reduced to about one third of the original system. The proposed method is also

  2. Technical and economic feasibility of superconducting power transmission: a case study

    International Nuclear Information System (INIS)

    Forsyth, E.B.; Mulligan, G.A.; Beck, J.W.; Williams, J.A.

    1975-01-01

    The long-range plans of the Long Island Lighting Company include the installation of 4600 MW of generation capacity at nuclear sites on eastern Long Island by the 1990's. A single site, Shoreham, was chosen for this study which would require transmission facilities to the Ruland Road substation, 43 miles away. Conventional 345 kV overhead and underground circuits are planned for this service. For the case study three superconducting cable schemes have been investigated which reflect various technical options. The superconducting cables have been designed to meet acceptable normal and contingency load flow conditions and to withstand maximum short circuit faults. A cost analysis has been made of the complete installation, providing a valuable comparison of the estimated cost of this new technology with conventional methods. The most favorable cost comparison is a two-circuit 345 kV superconducting system, which appears to be about one-half the cost of an all underground 345 kV high pressure oil-filled cable system. No reactive compensation will be required for the superconducting system, whereas extensive compensation is required for HPOF cables over the same distance. The cost estimate for the two-circuit superconducting system is about twice that of 345 kV overhead transmission, which would consist of two double circuits and one single circuit, assuming right-of-way could be obtained. (U.S.)

  3. Wireless transmission: state of research, applications, trends

    International Nuclear Information System (INIS)

    Berger, A.

    2016-01-01

    At the end of the 19th century Nikola Tesla started his work in the field of wireless energy transmission. More than 100 years after Tesla, the progress in modern semiconductor technology offer developers the possibility to realize highly efficient systems and have led to a revival of wireless energy transmission. The application ranges from the transmission of a few milliwatts in biomedical applications, over a few watts for the charging of mobile phones, to hundreds of kilowatts in the automotive sector. Depending on the used method, the possible transmission distances vary between a few centimeters up to thousands of kilometers. The physical basis of these technologies is the transmission of energy by electromagnetic waves. State-of-the-art systems use wavelengths ranging from radio waves to microwaves, to ultraviolet light. Current research focuses on optimizing transmission efficiency, increasing the possible transmission distance between transmitter and receiver, and improving spatial freedom of movement. This lecture gives an overview of the different approaches of wireless energy transmission and their physical background, the established industrial standards and the current state of research. In addition, the advantages and disadvantages of the individual methods are illustrated by selected commercial and scientific applications. (rössner) [de

  4. TWRS privatization phase 1 electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    This document includes Conceptual Design Report (CDR) for a new 11 km (7 miles) 230 kV transmission line and a new 40 MVA substation (A6) which will be located east of Grout Facility in 200E Area tank farm. This substation will provide electrical power up to 20 MW each for two private contractor facilities for immobilization and disposal of low activity waste (LAW)

  5. NorthernLights Transmission : bringing competitive cogen energy from the oil sands to west coast markets

    International Nuclear Information System (INIS)

    Hogan, M.J.C.

    2005-01-01

    NorthernLights Transmission is an initiative by TransCanada that proposes 2 major high-voltage direct current (HVDC) transmission lines to bring low cost, fossil fuelled and renewable generation from the Fort McMurray area to growing electricity markets in the Pacific Northwest, Nevada, Arizona and California. This presentation demonstrated why oil sands cogeneration, shipped via NorthernLights Transmission, is a very attractive resource for these markets. It was shown that the best generation resources are tied to natural resources such as coal, wind, oil sands cogeneration and hydro. Both the Pacific Northwest and California markets prefer low carbon dioxide generation. The proposed HVDC transmission lines would maximize the use of existing energy infrastructure corridors and rights-of-way where possible. This paper presented details of the proposed Celilo Project and the Inland Project, and noted that both are attractive from a technical and economic perspective. The transmission line for the Celilo project would originate in Fort McMurray and connect highly efficient cogeneration and other developing forms of generation to growing loads in the Pacific Northwest and northern California. The cogeneration plants will supply steam and electricity to northern Alberta's oil sands developments along with surplus electricity for export. tabs., figs

  6. Energy efficient downlink MIMO transmission with linear precoding

    Institute of Scientific and Technical Information of China (English)

    XU Jie; LI ShiChao; QIU Ling; SLIMANE Ben S.; YU ChengWen

    2013-01-01

    Energy efficiency (EE) is becoming increasingly important for wireless cellular networks. This paper addresses EE optimization problems in downlink multiuser MIMO systems with linear precoding. Referring to different active transmit/receive antenna sets and transmission schemes as different modes, we propose a joint bandwidth/power optimization and mode switching scheme to maximize EE. With a specific mode, we prove that the optimal bandwidth and transmit power is either full transmit power or full bandwidth. After deriving the optimal bandwidth and transmit power, we further propose mode switching to select the mode with optimal EE. Since the optimal mode switching, i.e. exhaustive search, is too complex to implement, an alternative heuristic method is developed to decrease the complexity through reducing the search size and avoiding the EE calculation during each search. Through simulations, we demonstrate that the proposed methods can significantly improve EE and the performance is similar to the optimal exhaustive search.

  7. New technologies for substations: non-conventional measurement transformer's; Impact des nouvelles technologies dans les postes. Exemple des transformateurs de mesure non conventionnels

    Energy Technology Data Exchange (ETDEWEB)

    Dupraz, J.P.; Jung, T. [ALSTOM T et D, 91 - Bretigny sur Orges (France)

    2002-01-01

    NCITs have been introduced in High Voltage substations a long time ago, but their use remains rather scarce. Despite their obvious advantages, they are often perceived as more complex, less reliable and more expensive than conventional technologies. All these drawbacks are rapidly fading now, especially for VHV and HV fields. It is now possible to assess reliability and availability of complex electronic systems, with digital outputs (point-to-point or connected to a process-bus) which are redundant and, sometimes, fault-tolerant. Tools coming from the electronics industry like predictive reliability calculations and field experience coming from other industries using the same type of transducers make it possible to define precisely the MTTF, MTBF and MTTR of the equipment, although their use often implies a complete change of technical culture compared to the conventional technology. Some topics related to these calculations are detailed in this report. Some questions related to the service time of substation components versus electronic components obsolescence will also be discussed as well as maintenance related issues. (authors)

  8. Theoretical study of the transmission of low-energy (0-10 eV) electrons through thin-film organic molecular solids: benzene

    International Nuclear Information System (INIS)

    Goulet, T.; Jay-Gerin, J.-P.

    1986-01-01

    A theoretical study of the transmission of low-energy (0 to 10 eV) electrons incident from vacuum through thin-film organic molecular solids deposited on a cold metal substrate is presented and developed for the specific case of solid benzene. In essence, using a semiclassical description of electron transport in solids with an energy-independent scattering mean free path and assuming an isotropic electron scattering, the behavior of a penetrating electron in the film is simulated when a large number of scattering events are present. The good agreement between the calculated electron transmission spectra and those obtained experimentally indicates that our study provides a realistic description of the electron transport in the film, and accounts for the influence of the various electron-molecule scattering processes upon the energy dependence of the transmitted current. In particular, we show that the excitonic subionization energy losses are at the origin of the main structures of the observed electron transmission spectra. It is also shown that our study can successfully be used to estimate the probabilities of the various electron scattering processes which occur in the film, as well as the electron mean free path (l). For solid benzene, l is about 8 A in the considered electron energy range. (author)

  9. Numerical method to calculate the quantum transmission, resonance and eigenvalue energies: application to a biased multibarrier systems

    Energy Technology Data Exchange (ETDEWEB)

    Maiz, F., E-mail: fethimaiz@gmail.com [University of Cartage, Nabeul Engineering Preparatory Institute, Merazka, 8000 Nabeul (Tunisia); King Khalid University, Faculty of Science, Physics Department, PO Box 9004, Abha 61413 (Saudi Arabia)

    2015-04-15

    A novel method to calculate the quantum transmission, resonance and eigenvalue energies forming the sub-bands structure of non-symmetrical, non-periodical semiconducting heterostructure potential has been proposed in this paper. The method can be applied on a multilayer system with varying thickness of the layer and effective mass of electrons and holes. Assuming an approximated effective mass and using Bastard's boundary conditions, Schrödinger equation at each media is solved and then using a confirmed recurrence method, the transmission and reflection coefficients and the energy quantification condition are expressed. They are simple combination of coupled equations. Schrödinger's equation solutions are Airy functions or plane waves, depending on the electrical potential energy slope. To illustrate the feasibility of the proposed method, the N barriers – (N−1) wells structure for N=3, 5, 8, 9, 17 and 35 are studied. All results show very good agreements with previously published results obtained from applying different methods on similar systems.

  10. Transmission Congestion Management using a Wind Integrated Compressed Air Energy Storage System

    Directory of Open Access Journals (Sweden)

    S. Gope

    2017-08-01

    Full Text Available Transmission congestion is a vital problem in the power system security and reliability sector. To ensure the stable operation of the system, a congestion free power network is desirable. In this paper, a new Congestion Management (CM technique, the Wind integrated Compressed Air Energy Storage (WCAES system is used to alleviate transmission congestion and to minimize congestion mitigation cost. The CM problem has been solved by using the Generator Sensitivity Factor (GSF and the Bus Sensitivity Factor (BSF. BSF is used for finding the optimal location of WCAES in the system. GSF with a Moth Flame Optimization (MFO algorithm is used for rescheduling the generators to alleviate congestion and to minimize congestion cost by improving security margin. The impact of the WCAES system is tested with a 39 bus system. To validate this approach, the same problem has been solved with a Particle Swarm Optimization (PSO algorithm and the obtained results are compared with the ones from the MFO algorithm.

  11. Development of advanced methods for planning electric energy distribution systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Goenen, T.; Foote, B.L.; Thompson, J.C.; Fagan, J.E.

    1979-10-01

    An extensive search was made for the identification and collection of reports published in the open literature which describes distribution planning methods and techniques. In addition, a questionnaire has been prepared and sent to a large number of electric power utility companies. A large number of these companies were visited and/or their distribution planners interviewed for the identification and description of distribution system planning methods and techniques used by these electric power utility companies and other commercial entities. Distribution systems planning models were reviewed and a set of new mixed-integer programming models were developed for the optimal expansion of the distribution systems. The models help the planner to select: (1) optimum substation locations; (2) optimum substation expansions; (3) optimum substation transformer sizes; (4) optimum load transfers between substations; (5) optimum feeder routes and sizes subject to a set of specified constraints. The models permit following existing right-of-ways and avoid areas where feeders and substations cannot be constructed. The results of computer runs were analyzed for adequacy in serving projected loads within regulation limits for both normal and emergency operation.

  12. Neutron resonance transmission spectroscopy with high spatial and energy resolution at the J-PARC pulsed neutron source

    Energy Technology Data Exchange (ETDEWEB)

    Tremsin, A.S., E-mail: ast@ssl.berkeley.edu [University of California at Berkeley, 7 Gauss Way, Berkeley, CA 94720 (United States); Shinohara, T.; Kai, T.; Ooi, M. [Japan Atomic Energy Agency, 2–4 Shirakata-shirane, Tokai-mura, Naka-gun, Ibaraki 319-1195 (Japan); Kamiyama, T.; Kiyanagi, Y.; Shiota, Y. [Hokkaido University, Kita 13 Nishi 8 Kita-ku, Sapporo-shi, Hokkaido 060-8628 (Japan); McPhate, J.B.; Vallerga, J.V.; Siegmund, O.H.W. [University of California at Berkeley, 7 Gauss Way, Berkeley, CA 94720 (United States); Feller, W.B. [NOVA Scientific, Inc., 10 Picker Rd., Sturbridge, MA 01566 (United States)

    2014-05-11

    The sharp variation of neutron attenuation at certain energies specific to particular nuclides (the lower range being from ∼1 eV up to ∼1 keV), can be exploited for the remote mapping of element and/or isotope distributions, as well as temperature probing, within relatively thick samples. Intense pulsed neutron beam-lines at spallation sources combined with a high spatial, high-timing resolution neutron counting detector, provide a unique opportunity to measure neutron transmission spectra through the time-of-flight technique. We present the results of experiments where spatially resolved neutron resonances were measured, at energies up to 50 keV. These experiments were performed with the intense flux low background NOBORU neutron beamline at the J-PARC neutron source and the high timing resolution (∼20 ns at epithermal neutron energies) and spatial resolution (∼55 µm) neutron counting detector using microchannel plates coupled to a Timepix electronic readout. Simultaneous element-specific imaging was carried out for several materials, at a spatial resolution of ∼150 µm. The high timing resolution of our detector combined with the low background beamline, also enabled characterization of the neutron pulse itself – specifically its pulse width, which varies with neutron energy. The results of our measurements are in good agreement with the predicted results for the double pulse structure of the J-PARC facility, which provides two 100 ns-wide proton pulses separated by 600 ns, broadened by the neutron energy moderation process. Thermal neutron radiography can be conducted simultaneously with resonance transmission spectroscopy, and can reveal the internal structure of the samples. The transmission spectra measured in our experiments demonstrate the feasibility of mapping elemental distributions using this non-destructive technique, for those elements (and in certain cases, specific isotopes), which have resonance energies below a few keV, and with lower

  13. Wireless Energy and Information Transmission in FSO and RF-FSO Links

    KAUST Repository

    Makki, Behrooz

    2017-09-22

    We propose and analyze a wireless energy and information transmission scheme in free-space optical (FSO) links. The results are presented for both quasi-static and fast-fading conditions. We derive closed-form expressions for throughput, outage probability and optimal power allocation optimizing the system throughput/outage probability. Finally, we complement the FSO link with an additional radio frequency (RF) link to create a hybrid RF-FSO system and reduce the system outage probability. The results show that joint implementation of the RF and FSO links leads to considerable performance improvement, compared to the cases with only FSO-based communication.

  14. Energy and exergy analysis of low temperature district heating network

    International Nuclear Information System (INIS)

    Li, Hongwei; Svendsen, Svend

    2012-01-01

    Low temperature district heating with reduced network supply and return temperature provides better match of the low quality building heating demand and the low quality heating supply from waste heat or renewable energy. In this paper, a hypothetical low temperature district heating network is designed to supply heating for 30 low energy detached residential houses. The network operational supply/return temperature is set as 55 °C/25 °C, which is in line with a pilot project carried out in Denmark. Two types of in-house substations are analyzed to supply the consumer domestic hot water demand. The space heating demand is supplied through floor heating in the bathroom and low temperature radiators in the rest of rooms. The network thermal and hydraulic conditions are simulated under steady state. A district heating network design and simulation code is developed to incorporate the network optimization procedure and the network simultaneous factor. Through the simulation, the overall system energy and exergy efficiencies are calculated and the exergy losses for the major district heating system components are identified. Based on the results, suggestions are given to further reduce the system energy/exergy losses and increase the quality match between the consumer heating demand and the district heating supply. -- Highlights: ► Exergy and energy analysis for low and medium temperature district heating systems. ► Different district heating network dimensioning methods are analyzed. ► Major exergy losses are identified in the district heating network and the in-house substations. ► Advantages to apply low temperature district heating are highlighted through exergy analysis. ► The influence of thermal by-pass on system exergy/energy performance is analyzed.

  15. National transmission grid study

    Energy Technology Data Exchange (ETDEWEB)

    Abraham, Spencer [USDOE Office of the Secretary of Energy, Washington, DC (United States)

    2003-05-31

    The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE’s Policy Office Electricity Modeling System (POEMS). DOE’s analysis, presented in Section 2, confirms the central role of the nation’s transmission system in lowering costs to consumers through increased trade. More importantly, DOE’s analysis also confirms the results of previous studies, which show that transmission bottlenecks and related transmission system market practices are adding hundreds of millions of dollars to consumers’ electricity bills each year. A more detailed technical overview of the use of POEMS is provided in Appendix A. DOE led an extensive, open, public input process and heard a wide range of comments and recommendations that have all been considered.1 More than 150 participants registered for three public workshops held in Detroit, MI (September 24, 2001); Atlanta, GA (September 26, 2001); and Phoenix, AZ (September 28, 2001).

  16. Variable Frequency Operations of an Offshore Wind Power Plant with HVDC-VSC: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, V.; Singh, M.; Muljadi, E.

    2011-12-01

    In this paper, a constant Volt/Hz operation applied to the Type 1 wind turbine generator. Various control aspects of Type 1 generators at the plant level and at the turbine level will be investigated. Based on DOE study, wind power generation may reach 330 GW by 2030 at the level of penetration of 20% of the total energy production. From this amount of wind power, 54 GW of wind power will be generated at offshore wind power plants. The deployment of offshore wind power plants requires power transmission from the plant to the load center inland. Since this power transmission requires submarine cable, there is a need to use High-Voltage Direct Current (HVDC) transmission. Otherwise, if the power is transmitted via alternating current, the reactive power generated by the cable capacitance may cause an excessive over voltage in the middle of the transmission distance which requires unnecessary oversized cable voltage breakdown capability. The use of HVDC is usually required for transmission distance longer than 50 kilometers of submarine cables to be economical. The use of HVDC brings another advantage; it is capable of operating at variable frequency. The inland substation will be operated to 60 Hz synched with the grid, the offshore substation can be operated at variable frequency, thus allowing the wind power plant to be operated at constant Volt/Hz. In this paper, a constant Volt/Hz operation applied to the Type 1 wind turbine generator. Various control aspects of Type 1 generators at the plant level and at the turbine level will be investigated.

  17. Long Island Smart Energy Corridor

    Energy Technology Data Exchange (ETDEWEB)

    Mui, Ming [Long Island Power Authority, Uniondale, NY (United States)

    2015-02-04

    The Long Island Power Authority (LIPA) has teamed with Stony Brook University (Stony Brook or SBU) and Farmingdale State College (Farmingdale or FSC), two branches of the State University of New York (SUNY), to create a “Smart Energy Corridor.” The project, located along the Route 110 business corridor on Long Island, New York, demonstrated the integration of a suite of Smart Grid technologies from substations to end-use loads. The Smart Energy Corridor Project included the following key features: -TECHNOLOGY: Demonstrated a full range of smart energy technologies, including substations and distribution feeder automation, fiber and radio communications backbone, advanced metering infrastructure (AM”), meter data management (MDM) system (which LIPA implemented outside of this project), field tools automation, customer-level energy management including automated energy management systems, and integration with distributed generation and plug-in hybrid electric vehicles. -MARKETING: A rigorous market test that identified customer response to an alternative time-of-use pricing plan and varying levels of information and analytical support. -CYBER SECURITY: Tested cyber security vulnerabilities in Smart Grid hardware, network, and application layers. Developed recommendations for policies, procedures, and technical controls to prevent or foil cyber-attacks and to harden the Smart Grid infrastructure. -RELIABILITY: Leveraged new Smart Grid-enabled data to increase system efficiency and reliability. Developed enhanced load forecasting, phase balancing, and voltage control techniques designed to work hand-in-hand with the Smart Grid technologies. -OUTREACH: Implemented public outreach and educational initiatives that were linked directly to the demonstration of Smart Grid technologies, tools, techniques, and system configurations. This included creation of full-scale operating models demonstrating application of Smart Grid technologies in business and residential

  18. Evidence of localized wave transmission

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    LLNL [Lawrence Livermore National Lab.] experiments to test the feasibility of launching an acoustic, directed-energy pulse train (ADEPT) in water have demonstrated localized transmission of wave energy far beyond the classical Rayleigh length that defines the boundary between near-field and far-field transmission for Gaussian (diffraction-limited) pulses. The results of the experiments are in excellent agreement with computer simulations

  19. 75 FR 63826 - Transmission Infrastructure Program-TransWest Express Transmission Project Capacity

    Science.gov (United States)

    2010-10-18

    ... Administration (Western), a Federal power marketing administration of the United States Department of Energy (DOE... operates an integrated 17,000 circuit mile, high-voltage transmission system across 15 western states... transmission lines and related facilities with at least one terminus in Western's marketing area, that deliver...

  20. Experience in the installation of a microprocessor system for controlling converter units of the Vyborg substation

    International Nuclear Information System (INIS)

    Gusakovskii, K. B.; Zmaznov, E. Yu.; Katantsev, S. V.; Mazurenko, A. K.; Mestergazi, V. A.; Prochan, G. G.; Funtikova, S. F.

    2006-01-01

    The experience in the installation of modern digital systems for controlling converter units at the Vyborg converter substation on the basis of advanced microprocessor devices is considered. It is shown that debugging of a control and protection system on mathematical and physical models does not guarantee optimum control of actual converter devices. Examples of advancing the control and protection system are described, the necessity for which has become obvious in tests of actual equipment. Comparison of oscillograms of processes before optimization of the control system and after its optimization and adjustment shows that the digital control system makes it possible to improve substantially the algorithms of control and protection in the short term and without changing the hardware component

  1. Electrical Systems for Wave Energy Conversion

    Energy Technology Data Exchange (ETDEWEB)

    Bostroem, Cecilia

    2011-07-01

    Wave energy is a renewable energy source with a large potential to contribute to the world's electricity production. There exist several technologies on how to convert the energy in the ocean waves into electric energy. The wave energy converter (WEC) presented in this thesis is based on a linear synchronous generator. The generator is placed on the seabed and driven by a point absorbing buoy on the ocean surface. Instead of having one large unit, several smaller units are interconnected to increase the total installed power. To convert and interconnect the power from the generators, marine substations are used. The marine substations are placed on the seabed and convert the fluctuating AC from the generators into an AC suitable for grid connection. The work presented in the thesis focuses on the first steps in the electric energy conversion, converting the voltage out from the generators into DC, which have an impact on the WEC's ability to absorb and produce power. The purpose has been to investigate how the generator will operate when it is subjected to different load cases and to obtain guidelines on how future systems could be improved. Offshore experiments and simulations have been done on full scale generators connected to four different loads, i.e. one linear resistive load and three different non-linear loads representing different cases for grid connected WECs. The results show that the power can be controlled and optimized by choosing a suitable system for the WEC. It is not obvious which kind of system is the most preferable, since there are many different parameters that have an impact on the system performance, such as the size of the buoy, how the generator is designed, the number of WECs, the highest allowed complexity of the system, costs and so on. Therefore, the design of the electrical system should preferably be carried out in parallel with the design of the WEC in order to achieve an efficient system

  2. Design of an effective energy receiving adapter for microwave wireless power transmission application

    Directory of Open Access Journals (Sweden)

    Peng Xu

    2016-10-01

    Full Text Available In this paper, we demonstrate the viability of an energy receiving adapter in a 8×8 array form with high power reception efficiency with the resonator of artificial electromagnetic absorber being used as the element. Unlike the conventional reported rectifying antenna resonators, both the size of the element and the separations between the elements are electrically small in our design. The energy collecting process is explained with an equivalent circuit model, and a RF combining network is designed to combine the captured AC power from each element to one main terminal for AC-to-DC conversion. The energy receiving adapter yields a total reception efficiency of 67% (including the wave capture efficiency of 86% and the AC-to-DC conversion efficiency of 78%, which is quite promising for microwave wireless power transmission.

  3. Modelling of plug and play interface for energy router based on IEC61850

    Science.gov (United States)

    Shi, Y. F.; Yang, F.; Gan, L.; He, H. L.

    2017-11-01

    Under the background of the “Internet Plus”, as the energy internet infrastructure equipment, energy router will be widely developed. The IEC61850 standard is the only universal standard in the field of power system automation which realizes the standardization of engineering operation of intelligent substation. To eliminate the lack of International unified standard for communication of energy router, this paper proposes to apply IEC61850 to plug and play interface and establishes the plug and play interface information model and information transfer services. This paper provides a research approach for the establishment of energy router communication standards, and promotes the development of energy router.

  4. An Algorithm for Timely Transmission of Solicitation Messages in RPL for Energy-Efficient Node Mobility.

    Science.gov (United States)

    Park, Jihong; Kim, Ki-Hyung; Kim, Kangseok

    2017-04-19

    The IPv6 Routing Protocol for Low Power and Lossy Networks (RPL) was proposed for various applications of IPv6 low power wireless networks. While RPL supports various routing metrics and is designed to be suitable for wireless sensor network environments, it does not consider the mobility of nodes. Therefore, there is a need for a method that is energy efficient and that provides stable and reliable data transmission by considering the mobility of nodes in RPL networks. This paper proposes an algorithm to support node mobility in RPL in an energy-efficient manner and describes its operating principle based on different scenarios. The proposed algorithm supports the mobility of nodes by dynamically adjusting the transmission interval of the messages that request the route based on the speed and direction of the motion of mobile nodes, as well as the costs between neighboring nodes. The performance of the proposed algorithm and previous algorithms for supporting node mobility were examined experimentally. From the experiment, it was observed that the proposed algorithm requires fewer messages per unit time for selecting a new parent node following the movement of a mobile node. Since fewer messages are used to select a parent node, the energy consumption is also less than that of previous algorithms.

  5. Evaluations of different domestic hot water preparing methods with ultra-low-temperature district heating

    International Nuclear Information System (INIS)

    Yang, Xiaochen; Li, Hongwei; Svendsen, Svend

    2016-01-01

    This study investigated the performances of five different substation configurations in single-family houses supplied with ULTDH (ultra-low-temperature district heating). The temperature at the heat plant is 46 °C and around 40 °C at the substations. To avoid the proliferation of Legionella in the DHW (domestic hot water) and assure the comfortable temperature, all substations were installed with supplementary heating devices. Detailed measurements were taken in the substations, including the electricity demand of the supplementary heating devices. To compare the energy and economic performance of the substations, separate models were built based on standard assumptions. The relative heat and electricity delivered for preparing DHW were calculated. The results showed that substations with storage tanks and heat pumps have high relative electricity demand, which leads to higher integrated costs considering both heat and electricity for DHW preparation. The substations with in-line electric heaters have low relative electricity usage because very little heat is lost due to the instantaneous DHW preparation. Accordingly, the substations with in-line electric heaters would have the lowest energy cost for DHW preparation. To achieve optimal design and operation for the ULTDH substation, the electricity peak loads of the in-line electric heaters were analysed according to different DHW-heating strategies. - Highlights: • Five different substations supplied with ultra-low-temperature district heating were measured. • The relative heat and electricity delivered for DHW preparation were modelled for different substations. • The levelized cost of the five substations in respect of DHW preparation was calculated. • The feasibility of applying instantaneous electric heater with normal power supply was tested.

  6. Energy and Transmissibility in Nonlinear Viscous Base Isolators

    Science.gov (United States)

    Markou, Athanasios A.; Manolis, George D.

    2016-09-01

    High damping rubber bearings (HDRB) are the most commonly used base isolators in buildings and are often combined with other systems, such as sliding bearings. Their mechanical behaviour is highly nonlinear and dependent on a number of factors. At first, a physical process is suggested here to explain the empirical formula introduced by J.M. Kelly in 1991, where the dissipated energy of a HDRB under cyclic testing, at constant frequency, is proportional to the amplitude of the shear strain, raised to a power of approximately 1.50. This physical process is best described by non-Newtonian fluid behaviour, originally developed by F.H. Norton in 1929 to describe creep in steel at high-temperatures. The constitutive model used includes a viscous term, that depends on the absolute value of the velocity, raised to a non-integer power. The identification of a three parameter Kelvin model, the simplest possible system with nonlinear viscosity, is also suggested here. Furthermore, a more advanced model with variable damping coefficient is implemented to better model in this complex mechanical process. Next, the assumption of strain-rate dependence in their rubber layers under cyclic loading is examined in order to best interpret experimental results on the transmission of motion between the upper and lower surfaces of HDRB. More specifically, the stress-relaxation phenomenon observed with time in HRDB can be reproduced numerically, only if the constitutive model includes a viscous term, that depends on the absolute value of the velocity raised to a non-integer power, i. e., the Norton fluid previously mentioned. Thus, it becomes possible to compute the displacement transmissibility function between the top and bottom surfaces of HDRB base isolator systems and to draw engineering-type conclusions, relevant to their design under time-harmonic loads.

  7. Influence of the Integral Quality Monitor transmission detector on high energy photon beams: A multi-centre study.

    Science.gov (United States)

    Casar, Bozidar; Pasler, Marlies; Wegener, Sonja; Hoffman, David; Talamonti, Cinzia; Qian, Jianguo; Mendez, Ignasi; Brojan, Denis; Perrin, Bruce; Kusters, Martijn; Canters, Richard; Pallotta, Stefania; Peterlin, Primoz

    2017-09-01

    The influence of the Integral Quality Monitor (IQM) transmission detector on photon beam properties was evaluated in a preclinical phase, using data from nine participating centres: (i) the change of beam quality (beam hardening), (ii) the influence on surface dose, and (iii) the attenuation of the IQM detector. For 6 different nominal photon energies (4 standard, 2 FFF) and square field sizes from 1×1cm 2 to 20×20cm 2 , the effect of IQM on beam quality was assessed from the PDD 20,10 values obtained from the percentage dose depth (PDD) curves, measured with and without IQM in the beam path. The change in surface dose with/without IQM was assessed for all available energies and field sizes from 4×4cm 2 to 20×20cm 2 . The transmission factor was calculated by means of measured absorbed dose at 10cm depth for all available energies and field sizes. (i) A small (0.11-0.53%) yet statistically significant beam hardening effect was observed, depending on photon beam energy. (ii) The increase in surface dose correlated with field size (pphoton energies except for 18MV. The change in surface dose was smaller than 3.3% in all cases except for the 20×20cm 2 field and 10MV FFF beam, where it reached 8.1%. (iii) For standard beams, transmission of the IQM showed a weak dependence on the field size, and a pronounced dependence on the beam energy (0.9412 for 6MV to 0.9578 for 18MV and 0.9440 for 6MV FFF; 0.9533 for 10MV FFF). The effects of the IQM detector on photon beam properties were found to be small yet statistically significant. The magnitudes of changes which were found justify treating IQM either as tray factors within the treatment planning system (TPS) for a particular energy or alternatively as modified outputs for specific beam energy of linear accelerators, which eases the introduction of the IQM into clinical practice. Copyright © 2017. Published by Elsevier GmbH.

  8. Influence of the Integral Quality Monitor transmission detector on high energy photon beams. A multi-centre study

    Energy Technology Data Exchange (ETDEWEB)

    Casar, Bozidar [Institute of Oncology, Ljubljana (Slovenia). Dept. of Radiation Physics; Pasler, Marlies [Lake Constance Radiation Oncology Center, Singen and Friedrichshafen (Germany); Wegener, Sonja [Wuerzburg Univ. (Germany). Dept. of Radiation Oncology; and others

    2017-10-01

    The influence of the Integral Quality Monitor (IQM) transmission detector on photon beam properties was evaluated in a preclinical phase, using data from nine participating centres: (i) the change of beam quality (beam hardening), (ii) the influence on surface dose, and (iii) the attenuation of the IQM detector. For 6 different nominal photon energies (4 standard, 2 FFF) and square field sizes from 1 x 1 cm{sup 2} to 20 x 20 cm{sup 2}, the effect of IQM on beam quality was assessed from the PDD{sub 20,10} values obtained from the percentage dose depth (PDD) curves, measured with and without IQM in the beam path. The change in surface dose with/without IQM was assessed for all available energies and field sizes from 4 x 4 cm{sup 2} to 20 x 20 cm{sup 2}. The transmission factor was calculated by means of measured absorbed dose at 10 cm depth for all available energies and field sizes. (i) A small (0.11-0.53%) yet statistically significant beam hardening effect was observed, depending on photon beam energy. (ii) The increase in surface dose correlated with field size (p < 0.01) for all photon energies except for 18 MV. The change in surface dose was smaller than 3.3% in all cases except for the 20 x 20 cm{sup 2} field and 10 MV FFF beam, where it reached 8.1%. (iii) For standard beams, transmission of the IQM showed a weak dependence on the field size, and a pronounced dependence on the beam energy (0.9412 for 6 MV to 0.9578 for 18 MV and 0.9440 for 6 MV FFF; 0.9533 for 10 MV FFF). The effects of the IQM detector on photon beam properties were found to be small yet statistically significant. The magnitudes of changes which were found justify treating IQM either as tray factors within the treatment planning system (TPS) for a particular energy or alternatively as modified outputs for specific beam energy of linear accelerators, which eases the introduction of the IQM into clinical practice.

  9. The exposure risks to the magnetic field at internal MV/LV substations; Os riscos da exposicao ao campo magnetico em subestacoes internas MT/BT

    Energy Technology Data Exchange (ETDEWEB)

    Keikko, Tommi; Valkealahti, Seppo [Tampere University of Technology (TUT), Tampere (Finland); Paeaekkoenen, Rauno [Finnish Institute of Occupational Health, Lappeenranta (Finland); Seesvuori, Reino [Tampere Power Distribution, Tampere (Finland); Kaennaelae, Sami [Radiation and Nuclear Safety Authority (STUK), Helsinki (Finland)

    2010-10-15

    The risk evaluation due to the magnetic field must be part of the protection concept of health during the work. This paper analyses the worker exposure to magnetic fields in abridged distribution substations, whose values must not surpass the established limits. The real measurements include exposures with measurements synchronous to the load currents and harmonic total distortion among others parameters. (author)

  10. Tunable electronic transmission gaps in a graphene superlattice

    International Nuclear Information System (INIS)

    Lu Weitao; Wang Shunjin; Li Wen; Wang Yonglong; Jiang Hua

    2012-01-01

    The transmission in graphene superlattices with adjustable barrier height is investigated using transfer-matrix method. It is found that one could control the angular range of transmission by changing the ratio of incidence energy and barrier height. The transmission as a function of incidence energy has more than one gaps, due to the appearance of evanescent waves in different barriers. Accordingly, more than one conductivity minimums are induced. The transmission gaps could be controlled by adjusting the incidence angle, the barrier height, and the barrier number, which gives the possibility to construct an energy-dependent wavevector filter.

  11. Energy Efficient Data Transmission for Sensors with Wireless Charging.

    Science.gov (United States)

    Fang, Xiaolin; Luo, Junzhou; Wu, Weiwei; Gao, Hong

    2018-02-08

    This paper studies the problem of maximizing the energy utilization for data transmission in sensors with periodical wireless charging process while taking into account the thermal effect. Two classes of problems are analyzed: one is the case that wireless charging can process for only a limited period of time, and the other is the case that wireless charging can process for a long enough time. Algorithms are proposed to solve the problems and analysis of these algorithms are also provided. For the first problem, three subproblems are studied, and, for the general problem, we give an algorithm that can derive a performance bound of ( 1 - 1 2 m ) ( O P T - E ) compared to an optimal solution. In addition, for the second problem, we provide an algorithm with 2 m 2 m - 1 O P T + 1 performance bound for the general problem. Simulations confirm the analysis of the algorithms.

  12. Experimental evaluation of radiator control based on primary supply temperature for district heating substations

    International Nuclear Information System (INIS)

    Gustafsson, Jonas; Delsing, Jerker; Deventer, Jan van

    2011-01-01

    Highlights: → We compared a new radiator system control approach with traditional control. → This is an experimental verification of previous simulation results. → We examine changes in delta-T and indoor comfort. → The indoor comfort were not affected by the introduction of alt. radiator control. → The alternative control method can contribute to an increased delta-T. -- Abstract: In this paper, we evaluate whether the primary supply temperature in district heating networks can be used to control radiator systems in buildings connected to district heating; with the purpose of increasing the ΔT. The primary supply temperature in district heating systems can mostly be described as a function of outdoor temperature; similarly, the radiator supply temperature in houses, offices and industries can also be described as a function of outdoor temperature. To calibrate the radiator control system to produce an ideally optimal radiator supply temperature that produces a maximized ΔT across the substation, the relationship between the primary supply temperature and outdoor temperature must be known. However, even if the relation is known there is always a deviation between the expected primary supply temperature and the actual temperature of the received distribution media. This deviation makes the radiator control system incapable of controlling the radiator supply temperature to a point that would generate a maximized ΔT. Published simulation results show that it is possible and advantageous to utilize the primary supply temperature for radiator system control. In this paper, the simulation results are experimentally verified through implementation of the control method in a real district heating substation. The primary supply temperature is measured by the heat-meter and is shared with the radiator control system; thus no additional temperature sensors were needed to perform the experiments. However additional meters were installed for surveillance purposes

  13. 36 CFR 292.21 - Definitions.

    Science.gov (United States)

    2010-07-01

    ... transmission line systems, substations, commercial radio transmitters, relays or repeater stations, antennas, and other electronic sites and associated structures. Traditional uses are ranching, grazing, farming...

  14. Electric power transmission for a Hanford Nuclear Energy Center (HNEC)

    International Nuclear Information System (INIS)

    1975-09-01

    The major issues examined in the comparison of the DIST and HNEC transmission concepts are: (1) type of transmission to be employed and an assessment of its technical feasibility, (2) availability of rights-of-way, (3) economics, (4) environmental impact, and (5) overall reliability of the transmission system. The type of transmission selected for bulk power transfer from an HNEC for the time period studied is overhead AC, 500 kV double or single circuit, a voltage currently used in the PNW system. This type of system can accommodate growth up to at least 23,000 MW of thermal capacity at an HNEC. Significant additional transmountain capacity needs would require 1100 kV transmission, which should be technologically proved by the end of the 1970s. (auth)

  15. North-east transmission networks : organization and operations

    International Nuclear Information System (INIS)

    Roberge, F.

    2003-01-01

    A review of Quebec's electric power industry was presented along with an outline of non-regulated activity and regulated activities in terms of power generation, transmission, distribution and customer service. Both the transmission and distribution components of Quebec's electric power industry are regulated by the Regie de l'energie. Transmission networks offer access to all wholesalers. Hydro-Quebec TransEnergie was created in 1997 as a functionally independent open access transmission provider with high reliability standards. TransEnergie can address seams issues with neighbouring networks. The three types of services offered in terms of tariffs were also discussed along with data regarding Hydro-Quebec assets, revenue and net income. Hydro-Quebec's relation with the New Brunswick, Ontario, New York and New England were presented along with the issue of congestion and congestion costs. Congestion was defined as an incapacity to deliver energy at low cost because of a limited grid capacity, which results in a need to use more expensive energy. Solutions to decrease congestion include: building new transmission lines; using specialized equipment at existing distribution points; constructing strategically placed power generating stations; reducing the power load; and, increasing network control. The factors that influence investments in transport were also discussed. 1 tab., 9 figs

  16. An analysis of power sector system losses in Bangladesh and Pakistan

    International Nuclear Information System (INIS)

    Choudhari, W.

    1995-01-01

    In this article, the author discusses the analysis of power sector system losses in both the countries which are similar in nature. The design and construction of major power plants, grid substations and transmission lines are constructed on the same pattern. The generation system loss under transmission must not exceed the limit and any loss above this limit could safely be taken as pilferage or theft of energy. The author is of the opinion that socio-economic conditions prevailing in both countries. The author is not in a position to analyse or comment on the causes of non-technical system loss in Pakistan, but he feels that some of the causes could also equally be applicable. (A.B.)

  17. A Cross-Layer Wireless Sensor Network Energy-Efficient Communication Protocol for Real-Time Monitoring of the Long-Distance Electric Transmission Lines

    Directory of Open Access Journals (Sweden)

    Jun Yu

    2015-01-01

    Full Text Available Optimization of energy consumption in Wireless Sensor Network (WSN nodes has become a critical link that constrains the engineering application of the smart grid due to the fact that the smart grid is characterized by long-distance transmission in a special environment. The paper proposes a linear hierarchical network topological structure specific to WSN energy conservation in environmental monitoring of the long-distance electric transmission lines in the smart grid. Based on the topological structural characteristics and optimization of network layers, the paper also proposes a Topological Structure be Layered Configurations (TSLC routing algorithm to improve the quality of WSN data transmission performance. Coprocessing of the network layer and the media access control (MAC layer is achieved by using the cross-layer design method, accessing the status for the nodes in the network layer and obtaining the status of the network nodes of the MAC layer. It efficiently saves the energy of the whole network, improves the quality of the network service performance, and prolongs the life cycle of the network.

  18. Proposed Columbia Wind Farm No. 1 : Final Environmental Impact Statement, Joint NEPA/SEPA.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat County (Wash.)

    1995-09-01

    CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Project`s construction and operation would include: install concrete pier foundations for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m{sup 2} steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.

  19. Coordination of voltage and reactive power control in the extra high voltage substations based on the example of solutions applied in the national power system

    Directory of Open Access Journals (Sweden)

    Dariusz Kołodziej

    2012-06-01

    Full Text Available This paper presents examples of coordination between automatic voltage and reactive power control systems (ARST covering adjacent and strongly related extra high voltage substations. Included are conclusions resulting from the use of these solutions. The Institute of Power Engineering, Gdańsk Division has developed and deployed ARST systems in the national power system for a dozen or so years.

  20. Floating microbial fuel cells as energy harvesters for signal transmission from natural water bodies

    Science.gov (United States)

    Schievano, Andrea; Colombo, Alessandra; Grattieri, Matteo; Trasatti, Stefano P.; Liberale, Alessandro; Tremolada, Paolo; Pino, Claudio; Cristiani, Pierangela

    2017-02-01

    A new type of floating microbial fuel cell (fMFC) was developed for power supply of remote environmental sensors and data transmission. Ten operating fMFCs generated a cell potential in the range 100-800 mV depending on the external resistance applied. Power production peaked around 3-3.5 mW (power density of 22-28 mW m-2 cathode) after about 20-30 days of start-up period. The average of daily electrical energy harvested ranged between 10 and 35 mWh/d. Long-term performances were ensured in the presence of dense rice plants (Oryza Sativa). A power management system, based on a step-up DC/DC converter and a low-power data transmission system via SIGFOX™ technology, have been set up for the fMFCs. The tested fMFCs systems allowed to: i) harvest produced energy, ii) supply electronic devices (intermittent LED-light and a buzzer); iii) transmit remote data at low speed (three message of 12 bites each, in 6 s). Several 'floating garden' MFCs were set in the context of demonstrative events at EXPO2015 world exposition held in Milan between May-October 2015. Some of the 'floating garden' MFCs were operating for more than one year.