WorldWideScience

Sample records for energy doe contract

  1. Energy conservation. Federal shared energy savings contracting

    International Nuclear Information System (INIS)

    Fultz, Keith O.; Milans, Flora H.; Kirk, Roy J.; Welker, Robert A.; Sparling, William J.; Butler, Sharon E.; Irwin, Susan W.

    1989-04-01

    A number of impediments have discouraged federal agencies from using shared energy savings contracts. As of November 30, 1988, only two federal agencies - the U.S. Postal Service (USPS) and the Department of the Army -had awarded such contracts even though they can yield significant energy and cost savings. The three major impediments we identified were uncertainty about the applicability of a particular procurement policy and practice, lack of management incentives, and difficulty in measuring energy and cost savings. To address the first impediment, the Department of Energy (DOE) developed a manual on shared energy savings contracting. The second impediment was addressed when the 100th Congress authorized incentives for federal agencies to enter into shared savings contracts. DOE addressed the third impediment by developing a methodology for calculating energy consumption and cost savings. However, because of differing methodological preferences, this issue will need to be addressed on a contract-by-contract basis. Some state governments and private sector firms are using performance contracts to reduce energy costs in their buildings and facilities. We were able to identify six states that were using performance contracts. Five have established programs, and all six states have projects under contract. The seven energy service companies we contacted indicated interest in federal shared energy savings contracting

  2. DOE Zero Energy Ready Home Case Study: Greenhill Contracting, Inc., Hickory Ridge

    Energy Technology Data Exchange (ETDEWEB)

    Pacific Northwest National Laboratory

    2017-09-01

    Greenhill Contracting built this 3,912-ft2 house in Gardiner, New York, to the high-performance criteria of the DOE Zero Energy Ready Home (ZERH) program. A highly efficient air-source heat pump heats and cools the home’s interior, while the roof-mounted photovoltaic system offsets electricity usage to cut energy bills to nearly zero. Many months the home owners see a credit on their utility bill.

  3. Energy contracting. Energy-related services and decentral energy supply. 2. ed.; Energie-Contracting. Energiedienstleistungen und dezentrale Energieversorgung

    Energy Technology Data Exchange (ETDEWEB)

    Hack, Martin

    2012-11-01

    According to the author, the intended German energy turnaround cannot be achieved solely on the basis of power from renewables and by constructing new passive buildings. Also required are decentral energy services if the energy saving and efficiency goals are to be achieved. In spite of many variations, the basic structure of these is the following: A contractor providing energy services does not only supply energy but also carries the risk and responsibility for efficient supply. This will relieve energy users, whether industrial or trade enterprises, public administration or home owners from this task; also, this integrated approach will open up undeveloped efficiency potentials. The book discusses current legal issues in a clear and practice-oriented manner and also provides a check list for energy contracting and an exemplary contract. (orig./RHM)

  4. Super Energy Savings Performance Contracts: Federal Energy Management Program (FEMP) Program Overview (revision)

    International Nuclear Information System (INIS)

    Pitchford, P.

    2001-01-01

    This four-page publication describes the U.S. Department of Energy's (DOE's) streamlined energy savings performance contracting, or ''Super ESPC,'' process, which is managed by DOE's Federal Energy Management Program (FEMP). Under a Super ESPC, a qualifying energy service company (ESCO) from the private sector pays for energy efficiency improvements or advanced renewable energy technologies (e.g., photovoltaic systems, wind turbines, or geothermal heat pumps, among others) for a facility of a government agency. The ESCO is then repaid over time from the agency's resulting energy cost savings. Delivery orders under these contracts specify the level of performance (energy savings) and the repayment schedule; the contract term can be up to 25 years, although many Super ESPCs are for about 10 years or less

  5. Department of Energy contract/business management initiatives

    International Nuclear Information System (INIS)

    Fisher, S.B.

    1992-01-01

    More than 40 years ago the Department of Energy (DOE) developed a unique contractual instrument called a management and operating contract, to be used for the operation of our weapons production plants and the national laboratories. The contracts are very broad in scope. There is no output objective set forth in the contract. There are no cost targets, nor any contractually motivated cost objectives. Performance is measured against criteria which is often subjective. The time has come to make changes in the structure of these contracts to reflect changes in the work being performed and to make the contractors more accountable. DOE's work now, at these sites, and for years to come, consists largely of major project-type work such as environmental restoration which lends itself to a more definitized structure. DOE is in the process of implementing a work order authorization control system (task order contracting) under its management and operating contracts. Target date for implementation for our for-profit contractors is FY 1992, and for the non-profit contractors is FY 1993. Under this system, requirements will be contracted for as entities of work and contractors will be held accountable for performance, schedules and costs. Billings, payments and award fee will be tied to the specific planning objectives set forth in the tasks, including costs and schedules. Incentives will be provided for outstanding performance, fee may be withheld if performance is unacceptable. These changes will necessitate more DOE oversight of contractor operations and sound business support systems, as well as effective management disciplines. US DOE will perform business management reviews to assure contractors' systems are adequate and to support this form of contracting. The Contractor Procurement Systems Review Program will be enhanced to assure good subcontractor procurement practices

  6. 25 CFR 900.133 - Does the declination process or the Contract Dispute Act apply to construction contract...

    Science.gov (United States)

    2010-04-01

    ...-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.133 Does the declination process or the Contract... 25 Indians 2 2010-04-01 2010-04-01 false Does the declination process or the Contract Dispute Act apply to construction contract amendments proposed either by an Indian tribe or tribal organization or...

  7. DOE's foreign research reactor transportation services contract: Perspective and experience

    International Nuclear Information System (INIS)

    Patterson, John

    1997-01-01

    DOE committed to low- and moderate-income countries participating in the foreign research reactor spent fuel returns program that the United States government would provide for the transportation of the spent fuel. In fulfillment of that commitment, DOE entered into transportation services contracts with qualified, private-sector firms. NAC will discuss its experience as a transportation services provider, including range of services available to the foreign reactors, advantages to DOE and to the foreign research reactors, access to contract services by high income countries and potential advantages, and experience with initial tasks performed under the contract. (author)

  8. Utility Energy Services Contracts: Enabling Documents

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-05-01

    Utility Energy Services Contracts: Enabling Documents provides materials that clarify the authority for Federal agencies to enter into utility energy services contracts (UESCs), as well as sample documents and resources to ease utility partnership contracting.

  9. Energy Savings Performance Contract Energy Sales Agreement Toolkit

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-08-14

    FEMP developed the Energy Savings Performance Contracting Energy Sales Agreement (ESPC ESA) Toolkit to provide federal agency contracting officers and other acquisition team members with information that will facilitate the timely execution of ESPC ESA projects.

  10. Utility Energy Services Contracts: Enabling Documents

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Karen; Vasquez, Deb

    2017-01-01

    The Federal Energy Management Program's 'Utility Energy Service Contracts: Enabling Documents' provide legislative information and materials that clarify the authority for federal agencies to enter into utility energy service contracts, or UESCs.

  11. The economics of energy service contracts

    Energy Technology Data Exchange (ETDEWEB)

    Sorrell, S. [University of Sussex, Brighton (United Kingdom). Sussex Energy Group, SPRU -Science and Technology Policy Research

    2007-01-15

    Energy service contracting can provide a cost-effective route to overcoming barriers to energy efficiency. Energy service contracts allow the client to reduce operating costs, transfer risk and concentrate attention on core activities. However, the energy services model may only be appropriate for a subset of energy services and energy using organisations. A challenge for both business strategy and public policy is to identify those situations in which energy service contracting is most likely to be appropriate and the conditions under which it is most likely to succeed. Energy service contracting is a form of outsourcing. It will only be chosen where the expected reduction in the production cost of supplying energy services can more than offset the transaction cost of negotiating and managing the relationship with the energy service provider. Production costs will be determined by a combination of the physical characteristics of the energy system and the technical efficiency of the relevant organisational arrangements, including economies of scale and specialisation. Transaction costs, in turn, will be determined by the complexity of the energy service, the 'specificity' of the investments made by the contractor, the competitiveness of the energy services market and the relevant legal, financial and regulatory rules. This paper develops these ideas into a general framework that may be used to assess the feasibility of energy service contracting in different circumstances. The framework leads to a number of hypotheses that are suitable for empirical test. (author)

  12. The economics of energy service contracting

    Energy Technology Data Exchange (ETDEWEB)

    Sorrell, Steve [Univ. of Sussex (United Kingdom). SPRU

    2005-07-01

    Energy service contracting can provide a cost-effective route to overcoming barriers to energy efficiency. Energy service contracts allow the client to reduce operating costs, transfer risk and concentrate attention on core activities. However, the energy services model may only be appropriate for a subset of energy services and energy using organisations. A challenge for both business strategy and public policy is to identify those situations in which energy service contracting is most likely to be appropriate and the conditions under which it is most likely to succeed. Energy service contracting is a form of outsourcing. It will only be chosen where the expected reduction in the production cost of supplying energy services can more than offset the transactions cost of negotiating and managing the relationship with the energy service provider. Production costs will be determined by a combination of the physical characteristics of the energy system and the technical efficiency of the relevant organisational arrangements, including economies of scale and specialisation. Transaction costs, in turn, will be determined by the complexity of the energy service, the 'specificity' of the investments made by the contractor, the 'contestability' of the energy services market and the relevant legal, financial and regulatory rules. This paper develops these ideas into a general framework that may be used to assess the feasibility of energy service contracting in different circumstances. The framework leads to a number of hypotheses that are suitable for empirical test.

  13. The economics of energy service contracts

    International Nuclear Information System (INIS)

    Sorrell, Steve

    2007-01-01

    Energy service contracting can provide a cost-effective route to overcoming barriers to energy efficiency. Energy service contracts allow the client to reduce operating costs, transfer risk and concentrate attention on core activities. However, the energy services model may only be appropriate for a subset of energy services and energy using organisations. A challenge for both business strategy and public policy is to identify those situations in which energy service contracting is most likely to be appropriate and the conditions under which it is most likely to succeed. Energy service contracting is a form of outsourcing. It will only be chosen where the expected reduction in the production cost of supplying energy services can more than offset the transaction cost of negotiating and managing the relationship with the energy service provider. Production costs will be determined by a combination of the physical characteristics of the energy system and the technical efficiency of the relevant organisational arrangements, including economies of scale and specialisation. Transaction costs, in turn, will be determined by the complexity of the energy service, the 'specificity' of the investments made by the contractor, the competitiveness of the energy services market and the relevant legal, financial and regulatory rules. This paper develops these ideas into a general framework that may be used to assess the feasibility of energy service contracting in different circumstances. The framework leads to a number of hypotheses that are suitable for empirical test

  14. Explaining the contract terms of energy performance contracting in China: The importance of effective financing

    International Nuclear Information System (INIS)

    Li, Yan; Qiu, Yueming; Wang, Yi David

    2014-01-01

    Energy service company (“ESCO”) uses Energy Performance Contracting (“EPC”) to provide energy-saving services to its clients. Under an EPC, both ESCO and the client invest in the energy efficiency measures, according to a negotiated share of investment. Within the length of the contract, the ESCO and its client divide up the saved energy bill according to a negotiated share. Once the contract expires, the client claims all of the saved energy bills if the energy efficiency measures still last. Different EPC projects have different contract terms, including total investment, share of investment and length of contract. These contract terms directly determine the resulted energy savings. Thus it is essential and important to look at how these contract terms are formed and what are the major influencing factors. This paper first builds a theoretical bargain model between ESCO and its client to find out the structural relationship among these contract terms. Then, using the information of about 140 EPC contracts in China in 2010 and 2011, the paper empirically estimates the impacts of various factors on the contract terms and the resulted energy savings. We find that cost of capitals for ESCOs and the clients, especially for ESCOs, is a major factor influencing contract terms and the resulted energy savings. Thus providing effective financing is critical for the development of EPC in China. - Highlights: • We build a theoretical bargain model between an ESCO and its client. • We empirically quantify the impacts of various factors on EPC contract terms. • Cost of capital is a key factor determining EPC contract terms. • Providing effective financing, especially for ESCOs is important

  15. Final PHP bench-scale report for the DOE-ID/SAIC sole source contract

    International Nuclear Information System (INIS)

    1997-04-01

    The Plasma Hearth Process (PHP) Technology Development Project was established to develop, test, and evaluate a new concept for treating mixed waste. The new concept uses direct current (dc) transferred-arc plasma torch technology to process mixed waste into a glass-like end-product. Under the cognizance of the US Department of Energy (DOE) Office of Technology Development (OTD) Mixed Waste Focus Area (MWFA), the technology is being explored for its potential to treat mixed waste. Because it is a mature technology, well-understood and commercially available, it is expected to develop rapidly in this new application. This report summarizes the radioactive bench-scale system activities funded under PHP Sole Source Contract DE-AC07-94ID13266 through the end of the contract

  16. Contracting and building renovation - does it work together?

    Energy Technology Data Exchange (ETDEWEB)

    Tritthart, Wibke; Bruner-Lienhart, Susanne [Inter-Univ. Research Centre for Technology, Work and Culture, Graz (Austria); Bleyl, Jan W.; Bucar, Gerhard [Graz Energy Agency (Austria)

    2007-07-01

    The renovation or refurbishment is an important point in the life cycle of a building that makes it possible to achieve both environmental and climate protection goals and a higher quality of living of the inhabitants. However, lack of money often leads to a renovation that covers only the basic requirements, whereas measures that are valuable in a long term perspective like energy saving measures are not realised. Energy performance contracting (EPC) is widely used as an instrument to reduce long term operating costs significantly by guaranteed energy savings. An energy service company (ESCo) implements saving technologies, especially in the field of heating, HVAC, lighting and plug loads, and in particular in public buildings. It is the aim of this paper to investigate the possibilities to incorporate construction measures like building envelope insulation into standard energy performance contracting.For this purpose a qualitative survey is presented that was performed among experts and stakeholders in the business: ESCos, building owners and facility managers, representatives of construction companies and financing institutions were interviewed. The focus was on their experiences with such projects, on difficulties that arose or barriers that exist from their point of view and on the chances they perceived. This provides the basis for identifying restraints and supporting factors for the integration of contracting and constructional measures.Three pilot projects that have been renovated in Austria are outlined subsequently. They are evaluated with respect to the contractual network between the project partners, types of guarantees and financing issues. Special emphasis is put on the assignment of tasks and the cash flow between the project partners. Various constellations of trades acted as energy service provider: a general contractor, an energy supply company, a consortium of a builder and a plumber. The projects reveal some differences to the standard energy

  17. 48 CFR 970.1504 - Contract pricing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract pricing. 970.1504 Section 970.1504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504 Contract pricing. ...

  18. Energy contracting has lots to offer

    International Nuclear Information System (INIS)

    Aeberli, O.

    2001-01-01

    In this interview with Roland Heller, CEO of Greenergy Contracting AG, the future of contracting as a way of providing reliable and cheap energy services for enterprises is discussed. The topic is treated from the points of view of both the supplier of energy services - the contractor - and of the customer / energy user. Advantages to be gained by both sides in the financial and technical areas are listed. The use of modern, efficient technologies such as combined heat and power (CHP) units is discussed. Examples of successful co-operation with local utilities are given, including solutions where the utility provides gas and base load energy and the CHP units deliver valuable peak-load energy to the grid. Political aspects such as the influence of market liberalisation and environmental factors are discussed and the market for contracting solutions is also examined

  19. Energy service contracting in DOD

    International Nuclear Information System (INIS)

    Dahle, D.E.

    1993-01-01

    The U.S. Department of Defense (DOD) annually consumes about $3 Billion in energy to operate facilities at military installations worldwide, representing about 80% of utility operating expense for all Federal facilities. Recent legislation and a Presidential Executive Order have directed DOD by Fiscal Year 2000 to reduce facility energy consumption by 20%, from the level of energy used in Fiscal Year 1985. To achieve this goal it is estimated that energy efficiency improvement investments between $2-3 billion would be required. Considering the competition for resources within DOD as it experiences downsizing and restructuring, DOD will need to seek opportunities to tap alternative investment strategies through energy service contracting to leverage Federal resources. Shared Energy Savings and Operations and Maintenance Energy Services contracting activities in the Department of the Navy will be used to address how such acquisition methods can contribute to achieving DOD energy efficiency goals

  20. Energy contracting in Switzerland

    International Nuclear Information System (INIS)

    Muggli, C.

    2000-01-01

    The article discusses the status of energy contracting in Switzerland and compares it with the situation in USA, Germany and France, where it has been standard practice for many years. The fact that this financing and operating instrument is not widely used in Switzerland in spite of its benefits for users and suppliers is discussed, as are the obstacles placed in its way. The results of a study made by the Federal Office of Energy are presented, whereby some 220 existing contracting arrangements with a total investment volume of around CHF 200 million were noted and a further potential of around CHF 1.1 billion estimated. The author notes that in order to utilise this potential, great efforts must be made by all parties involved

  1. 13 CFR 126.609 - What must the contracting officer do if a contracting opportunity does not exist for competition...

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What must the contracting officer do if a contracting opportunity does not exist for competition among qualified HUBZone SBCs? 126.609 Section 126.609 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION HUBZONE PROGRAM Contractual...

  2. 48 CFR 923.7003 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 923.7003... Efficiency, Renewable Energy Technologies, and Occupational Safety Programs 923.7003 Contract clauses. (a) A decision to include or not include environmental, safety and health clauses in DOE contracts shall be made...

  3. Incorporating Non-energy Benefits into Energy Savings Performance Contracts

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Peter; Goldman, Charles; Gilligan, Donald; Singer, Terry

    2012-06-01

    This paper evaluates the issue of non-energy benefits within the context of the U.S. energy services company (ESCO) industry?a growing industry comprised of companies that provide energy savings and other benefits to customers through the use of performance-based contracting. Recent analysis has found that ESCO projects in the public/institutional sector, especially at K-12 schools, are using performance-based contracting, at the behest of the customers, to partially -- but not fully -- offset substantial accumulated deferred maintenance needs (e.g., asbestos removal, wiring) and measures that have very long paybacks (roof replacement). This trend is affecting the traditional economic measures policymakers use to evaluate success on a benefit to cost basis. Moreover, the value of non-energy benefits which can offset some or all of the cost of the non-energy measures -- including operations and maintenance (O&M) savings, avoided capital costs, and tradable pollution emissions allowances-- are not always incorporated into a formal cost-effectiveness analysis of ESCO projects. Nonenergy benefits are clearly important to customers, but state and federal laws that govern the acceptance of these types of benefits for ESCO projects vary widely (i.e., 0-100percent of allowable savings can come from one or more non-energy categories). Clear and consistent guidance on what types of savings are recognized in Energy Savings agreements under performance contracts is necessary, particularly where customers are searching for deep energy efficiency gains in the building sector.

  4. DOE management

    International Nuclear Information System (INIS)

    Rezendes, V.S.

    1991-07-01

    This paper reports that GAO, as well as the Department of Energy's Inspector General, have pointed out the need for major improvement in the University of California's management of the three DOE laboratories-Lawrence Livermore, Los Alamos, and Lawrence Berkeley- and DOE oversight of that management effort. GAO found problems with University of California controls over laboratory operations, such as managing property, protecting classified documents, and ensuring that subcontractors are not subject to foreign influence, which might lead to transfers of nuclear technology to foreign influence, which might lead to transfers of nuclear technology or materials to foreign countries. In addition, clauses in the University of California contracts hamper DOE's ability to effectively manage the laboratories. DOE has addressed many of the specific problems that GAO identified and has tried to improve overall contract management. Negotiations with the University of California to extend the laboratory contracts will present another opportunity for DOE to take a firm stance on the need for management improvements. Having appropriate procedures and resources in place would also help DOE carry out its administration of contracts

  5. Office of Inspector General report on special audit of pension plans for Department of Energy contract employees of the University of California

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    On May 15, 1996, the Department of Energy (DOE) announced its decision to extend and renegotiate its contracts with the University of California for the management and operation of the Los Alamos, Lawrence Berkeley, and Lawrence Livermore National Laboratories. Current contracts for the operation of these laboratories expire in 1997. The renegotiation process provides an opportunity for the Department to: (1) recover at least $620 million in excess assets from the pension plans it has funded for University of California employees who work at DOE`s laboratories; and (2) improve the Department`s ability to exercise prudent management of its interest in those pension funds. According to Department records, as of July 1, 1995, the University of California Retirement Plan had between $620 million and $2.0 billion in excess assets that were attributable to the Department of Energy (emphasis supplied). The wide variation in excess assets is a function of the assumptions used in making these calculations. These are described in Appendix 1 to this report. It was concluded as a result of the audit that, as part of the contract renegotiation process, the Department should obtain the cooperation and assistance of the University of California in recovering excess pension plan assets in a manner that does not affect the defined retirement benefits of the contract employees. This could include jointly sponsoring legislation to modify any existing legal restrictions.

  6. Contracting of energy services in Switzerland. Development, effects, market potentials

    International Nuclear Information System (INIS)

    Muggli, C.; Baumgartner, W.; Kohn, L.

    1999-06-01

    The authors of this detailed report first define the contracting of energy services, this new reality of the market place, and analyse its current status in Switzerland. Contracting is mainly to be understood as the delegation of certain energy-related services by a company. The total investment for the operated energy systems considered by the study is about 120 millions USD, with an installed power of 160 MW. This market is highly unhomogeneous and is the answer to various goals. Globally, it brings a more efficient use of energy, including a more frequent involvement of renewable energy sources, along with a lower risk and significant advantages for all contractors. That is the reason for the energy policy authority to recommend contracting. The report goes on with the analysis of the factors leading the chief executives to consider contracting of energy services, or on the contrary to exclude it. The authors estimate the realistic potential market for contracting in Switzerland to 650 millions USD for the period 1999-2004. They conclude by giving recommendations which should result in an acceleration of the contracting's development on the market place

  7. Utility Energy Services Contracts Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-08-01

    This document describes best practices in the use of Utility Energy Services Contracts. The recommendations were generated by a group of innovative energy managers in many successful projects. The topics include project financing, competition between utility franchises, and water conservation.

  8. Contracting of energy services: often a viable alternative

    International Nuclear Information System (INIS)

    Milic, M.; Bruendler, M.

    2001-01-01

    This article discusses the outsourcing of energy services as a viable alternative to the operation of own energy facilities. The advantages of contracting for enterprises wanting to focus on their core competencies and have their energy infrastructure financed, built, maintained and operated by a third party are discussed. Financial aspects are looked at and examples in connection with the calculation of actual energy costs are given. The article is concluded with tips on the evaluation of offers for contracting services and on the definition of ownership aspects and property boundaries

  9. Summary final report: Contract between the Japan atomic power company and the U.S. Department of Energy Improvement of core safety - study on GEM (III)

    International Nuclear Information System (INIS)

    Burke, T.M.; Lucoff, D.M.

    1997-01-01

    This report provides a summary of activities associated with the technical exchange between representatives of the Japan Atomic Power Company (JAPC) and the United States Department of Energy (DOE) regarding the development and testing of Gas Expansion Modules (GEM) at the Fast Flux Test Facility (FFTF). Issuance of this report completes the scope of work defined in the original contract between JAPC and DOE titled ''Study on Improvement of Core Safety - Study on GEM (III).'' Negotiations related to potential modification of the contract are in progress. Under the proposed contract modification, DOE would provide an additional report documenting FFTF pump start tests with GEMs and answer additional JAPC questions related to core safety with and without GEMs

  10. 48 CFR 970.2307-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... Vehicle Fleet Fuel Efficiency, in all management contracts providing for Contractor management of the motor vehicle fleet. [68 FR 52131, Sept. 2, 2003] Effective Date Note: At 75 FR 57695, Sept. 22, 2010... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency...

  11. U.S. Department of Energy Photovoltaic Energy Program Contract Summary: Fiscal Year 2000

    Energy Technology Data Exchange (ETDEWEB)

    Surek, T.

    2001-02-21

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the National Center for Photovoltaics (NCPV) and U.S. Department of Energy (DOE) National Photovoltaics Program from October 1, 1999, through September 30, 2000 (FY 2000). The mission of the DOE National Photovoltaics Program is to make PV a significant part of the domestic economy-as an industry and an energy resource. The two primary goals of the national program are to (1) maintain the U.S. industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NCPV is part of the National PV Program and provides leadership and support to the national program toward achieving its mission and goals. This Contract Summary for fiscal year (FY) 2000 documents some 179 research projects supported by the PV Program, performed by 107 organizations in 32 states, including 69 projects performed by universities and 60 projects performed by our industry partners. Of the total FY 2000 PV Program budget of $65.9 million, the industry and university research efforts received $36.9 million, or nearly 56%. And, of this amount, more than 93% was for contractors selected on a competitive basis. Much of the funding to industry was matched by industry cost-sharing. Each individual effort described in this summary represents another step toward improving PV manufacturing, performance, cost, and applications, and another step toward accomplishing the DOE PV Program's overall mission.

  12. Summary final report: Contract between the Japan atomic power company and the U.S. Department of Energy Improvement of core safety - study on GEM (III)

    Energy Technology Data Exchange (ETDEWEB)

    Burke, T.M.; Lucoff, D.M.

    1997-03-18

    This report provides a summary of activities associated with the technical exchange between representatives of the Japan Atomic Power Company (JAPC) and the United States Department of Energy (DOE) regarding the development and testing of Gas Expansion Modules (GEM) at the Fast Flux Test Facility (FFTF). Issuance of this report completes the scope of work defined in the original contract between JAPC and DOE titled ''Study on Improvement of Core Safety - Study on GEM (III).'' Negotiations related to potential modification of the contract are in progress. Under the proposed contract modification, DOE would provide an additional report documenting FFTF pump start tests with GEMs and answer additional JAPC questions related to core safety with and without GEMs.

  13. Understanding the Public Service Obligation in the Electricity Sector. Lessons for the Contracting Parties of the Energy Community Treaty

    Energy Technology Data Exchange (ETDEWEB)

    Karova, R. [Energy Community Secretariat, Vienna (Austria)

    2012-01-15

    The paper underlines that the EU energy acquis does not simply require the Contracting Parties to the Energy Community Treaty to liberalize their electricity markets, but it also provides for a 'safety net' to ensure the available of public services through the imposition of Public Service Obligations (PSO). Nevertheless, the paper points out that the present understanding of the PSOs in the Contracting Parties is not in compliance with the conditions provided byArtide 3 of the Electricity Directive. Therefore, it includes some policy recommendations and a proposal for introducing a duty of notification, which should be instructive for the Contracting Parties to improve their understanding of PSO in line with EU law, by thus effectively safeguarding the availability of public services in the electricity sector to their citizens without jeopardizing the effective electricity market liberalization.

  14. Insight conference proceedings : Ontario energy contracts 2005 : giving your company's energy trading the power it needs

    International Nuclear Information System (INIS)

    2005-01-01

    This conference provided a forum for discussing energy contracts in relation to energy trading. Issues concerning fixed priced electricity contracts and recent changes in the energy market were reviewed. Price procurement and interjurisdictional trading were examined. The role of the Independent Electricity System Operator (IESO) in the monitoring and procurement of energy contracts was evaluated. Various procurement strategies were discussed with reference to large institutions and industrial consumers. New regulatory developments relating to energy contracts in Ontario were reviewed and the emergence of demand side management as a commodity in the Ontario electricity market was discussed. Recent developments in the United States were examined in relation to Ontario's electricity sector. The conference featured 14 presentations, of which 1 has been catalogued separately for inclusion in this database. tabs., figs

  15. 2 CFR 182.125 - Does this part affect the Federal contracts that I receive?

    Science.gov (United States)

    2010-01-01

    ... GOVERNMENTWIDE GUIDANCE FOR GRANTS AND AGREEMENTS Reserved GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Purpose and Coverage § 182.125 Does this part affect the Federal contracts that I... violation of the requirements of this part, as described in § 182.510(c). However, this part does not apply...

  16. The energy performance contract - key towards energy efficiency in Europe?

    Directory of Open Access Journals (Sweden)

    Murafa Corina

    2017-07-01

    Full Text Available The paper focuses on the Energy Performance Contract (EPC as a business model for energy efficiency. More precisely, it examines, using two case studies, enablers and disablers – from an economic, legal and institutional/managerial perspective – for advancing this arrangement across the EU. The EU has set a 20% energy savings target by 2020 (roughly equivalent to turning off 400 power stations, with an even more ambitious target of 27% by 2030. To reach these ambitious targets, the investments needed are approximately EUR 100 bn/year across the EU (according to the European Commission. Energy efficiency is not, as fervent proponents often claim, the low hanging fruit in terms of investment efforts. Like any other sub-sector, such as transmission and distribution, it demands innovative financing instruments to ensure adequate scale-up. In the paper, I use two comparative case studies to identify and classify the disablers and enablers of Energy Performance Contracting/Energy Services Companies (ESCOs development: the European frontrunner, namely Germany, and a laggard, namely Romania. As research methodology, I use literature review, comparisons between similar government policy planning and evaluation documents, and stakeholder interviews. While academic literature on the topic (Seefeldt, 2003; Wilhelm, 2015 is developed for Germany, for Romania a critical reflection on EPC promotion policy is to be found only in industry documents (e.g.: ARPEE, 2013; Tractebel, 2015. The German success demonstrates that, contrary to the belief of Romanian stakeholders, it is not the lack of a standardized contract model that prevents EPC development, but lack of genuine commitment, drive and leadership of public officials in promoting this financing instrument. A solid communication between public authorities and private beneficiaries, and public administration capacity for impact assessment and evidence-based policy planning are two other significant

  17. Governance variety in the energy service contracting market

    Energy Technology Data Exchange (ETDEWEB)

    Ostertag, Katrin; Huelsmann, Friederike

    2008-07-01

    There is a surprisingly high variety of actors involved in the supply of energy service contracting arrangements. Based on an empirical record of approximately 2,500 contracting projects in the domain of space heating in Germany, the paper analyses specialisation patterns of contractors. An econometric model is used to test hypotheses derived from transaction cost economics, which contractor type should be expected for which kind of contracting project. According to our results, if physical, site and human asset specificity are high, governance modes are preferred, for which contracting represents a downward integration of business activities along the value-added chain. This includes the supply of contracting by municipal utilities. More specifically, municipal utilities occur as superior suppliers of contracting if combined heat and power is implemented, if the building served is connected to their gas grid and if it is a public building. This pattern could orient the development of contracting activities for utilities reconsidering their strategic position following the liberalisation of the electricity market. (orig.)

  18. The prospect of the DOE - CNPP bilateral contracts at the decommissioning stage

    International Nuclear Information System (INIS)

    Neretin, Yu.A.

    2002-01-01

    Obviously, the priority is the effective and purposeful consumption of the state accounts and foreign partners' funds at the CNPP decommissioning. Thereupon, it is expedient to use DOE and CNPP bilateral contracts experience in order to provide the decommissioning task performance at the schedule date

  19. Maintaining a Viable Energy Savings Performance Contract

    National Research Council Canada - National Science Library

    Weber, Katherine L; Huckeby, Michael A

    2005-01-01

    Substantial amounts of information are available on Energy Savings Performance Contract award requirements, measurement, and verification, but we have found very little information on the day-to-day...

  20. Financing the energy renovation of public buildings through Internal Contracting. Infinite Solutions Guidebook

    International Nuclear Information System (INIS)

    Schilken, Peter; Turner, Ian; Kuehnbach, Matthias; Simic, Ivan; Kuharic, Boris; Laranjeira, Celia; Rodrigues, Carlos; Couceiro, Carla; Presotto, Agnese; Mazzeschi, Alessandro; Cleto, Joao

    2017-02-01

    Meeting the European energy and climate policy objectives will require the mobilisation of substantial energy efficiency and renewable energy investments at the local level. Given both the substantial effort necessary to finance the energy transition and restricted municipal budgets, it is clear that these objectives cannot be met through traditional public financing such as grants or direct investment, but by finding a new approach to financing solutions. This Energy Cities guidebook is built upon a comprehensive analysis of Stuttgart's Internal Contracting scheme and a detailed questioning of it by the learning authorities within the INFINITE Solutions project. It is intended to offer guidelines to municipalities as well as universities, hospitals or other institutions interested in applying Internal Contracting to improve their energy consumption and efficiency performance. The approach of this guidebook is developed as follows: The concept of contracting - especially Internal Contracting - is introduced. Universal guidance is offered on how to implement an Internal Contracting scheme and keep it working over the long term. The Internal Contracting scheme is presented in practice. Several cities describe their individual approaches to Internal Contracting and the various ways they have been able to adapt the scheme

  1. 36 CFR 1212.115 - Does this part affect the Federal contracts that I receive?

    Science.gov (United States)

    2010-07-01

    ... ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Purpose and Coverage § 1212.115 Does this part affect the Federal contracts that I...

  2. Gauge Group Contraction of Electroweak Model and its Natural Energy Limits

    Directory of Open Access Journals (Sweden)

    Nikolai A. Gromov

    2015-09-01

    Full Text Available The low and higher energy limits of the Electroweak Model are obtained from first principles of gauge theory. Both limits are given by the same contraction of the gauge group, but for the different consistent rescalings of the field space. Mathematical contraction parameter in both cases is interpreted as energy. The very weak neutrino-matter interaction is explained by zero tending contraction parameter, which depends on neutrino energy. The second consistent rescaling corresponds to the higher energy limit of the Electroweak Model. At the infinite energy all particles lose masses, electroweak interactions become long-range and are mediated by the neutral currents. The limit model represents the development of the early Universe from the Big Bang up to the end of the first second.

  3. Utility Energy Services Contracts: Enabling Documents, May 2009 (Book)

    Energy Technology Data Exchange (ETDEWEB)

    2009-05-01

    Enabling Documents, delivered by the U.S. Department of Energy's Federal Energy Management Program (FEMP) to provide materials that clarify the authority for federal agencies to enter into utility energy services contracts (UESCs).

  4. 48 CFR 217.175 - Multiyear contracts for electricity from renewable energy sources.

    Science.gov (United States)

    2010-10-01

    ... electricity from renewable energy sources. 217.175 Section 217.175 Federal Acquisition Regulations System... renewable energy sources. (a) The head of the contracting activity may enter into a contract for a period not to exceed 10 years for the purchase of electricity from sources of renewable energy, as that term...

  5. Innovative procurement frameworks for energy performance contracting in the UK public sector

    OpenAIRE

    Nolden, Colin; Sorrell, Steve; Polzin, Friedemann

    2015-01-01

    Procurement Frameworks for Energy Performance Contracting (PFEPCs) simplify the process of negotiating, developing and implementing Energy Performance Contracts (EPCs) with Energy Service Companies (ESCOs). This paper analyses their role in promoting the implementation of cost-effective energy efficiency measures in the UK public sector. Compared to conventional approaches to procuring goods and services involving detailed specifications, PFEPCs translate the challenge of upgrading, retrofitt...

  6. On the legal nature of electricity supply contracts concluded by electricity companies and power stations generating electricity from renewable energy sources

    International Nuclear Information System (INIS)

    Herrmann, B.J.

    1998-01-01

    Section 2 of the German Act for enhanced use of electricity from renewable energy sources (StEG) defines the obligation to contract but not the contractual obligations, i.e. the conditions of performance of the contract (supply and purchase of electricity and the legal obligations of contractors). The analysis here shows that characterising this mandatory contract required by the act as an agreement of purchase and sale more appropriately describes the legal nature of the contract and the intent of the legislator than other contracts for supply and purchase of electricity, as for instance those concluded by electric utilities and their customers. One specific aspect elaborated by the author is that the StEG does not constitute an obligation to supply on the part of the renewable energy generating power station, so that the power station operator is not obliged to ensure availability of the electricity at any time or in terms of supplies that can be called off by the purchasing utility, whereas the electric utility is obliged by section 2 of the StEG to purchase the contractual amounts from the generating station. (orig./CB) [de

  7. What encourages local authorities to engage with energy performance contracting for retrofitting? Evidence from German municipalities

    International Nuclear Information System (INIS)

    Polzin, Friedemann; Flotow, Paschen von; Nolden, Colin

    2016-01-01

    Municipalities aiming at mitigating climate change by implementing new energy efficiency technologies face budgetary and capacity constraints. Outsourcing through energy service contracting could provide a solution. This paper reports results from a survey of 1298 municipalities concerning barriers to retrofitting public street lighting and the possible role of energy service contracting to overcome these barriers. Using a logistic regression analysis, the authors investigate determinants of opting for energy service contracts in the specific context of LED retrofits. Results point to an advantage of outsourcing in a financially and capacity-constrained environment, which corresponds with the main reasons for engaging in contracting: minimising investments and financial risks. However, municipalities often do not fully grasp the risks associated with retrofitting especially using a novel technology such as LED. In relation to that they underestimate the risk reduction potential of energy performance contracts (EPC). Previous experience with outsourcing increases the probability to engage in servitization although certain existing partnerships, particularly with utilities, prevent municipalities from considering energy performance contracts. Interestingly, engaging an energy consultant has a negative propensity to use energy service contracts, while pre-negotiated standardised contracts for energy performance contracts have a positive influence. - Highlights: •Barriers to retrofitting can be addressed through energy performance contracts (EPC). •Outsourcing has the potential to alleviate personnel and financial constraints. •Standardised contracts and previous experience with outsourcing facilitate use of EPC. •Engaging energy consultants has a negative influence on the willingness to adopt EPC. •Policy makers could support facilitators and standard contracts to boost EPC market.

  8. Integration of Multiple Contractors with Performance Type of Contracts

    International Nuclear Information System (INIS)

    BURDGE, L.F.

    2000-01-01

    The management practices, procedures, and processes that are suited to managing Management and Operation (MandO) type of contracts at Department of Energy (DOE) sites, which were cost reimbursement with award fee, are not well suited to managing contracts where fee is determined by performance metrics. Thus a different style of management, requiring substantial revamping of the management process, is needed. This shift in philosophy also requires a dramatic shift in culture. This paper will describe how these changes are being managed at the River Protection Project (RPP), located at the DOE's Hanford Site in Washington State, one of DOE's largest and highest risk environmental clean-up project

  9. Issues in contracting with small minority businesses

    Energy Technology Data Exchange (ETDEWEB)

    Wood, M.T.; Radford, M.L.; Saari, L.M.; Wright, J.

    1986-04-01

    The focus of this investigation was to identify issues central to increasing the involvement of small minority businesses (MBs) in federal or prime contracts with the Department of Energy (DOE), as a foundation for designing a program to assist buyers of contracted goods and services. The approach to determining issues involved interviewing the owners of 15 MBs, representing a range of businesses, and buyers and purchasing officers from three large DOE prime contractors. The interviewees identified issues related to positive working relationships and rated a predetermined set of 27 potential MB-DOE problems regarding their existence and criticalness. The issues identified by MBs were of two broad types. The predominant issues and barriers were associated with their being small businesses. Secondary issues reflected the disadvantaged status of the business (woman and/or minority-owned).

  10. 75 FR 50950 - Federal Speculative Position Limits for Referenced Energy Contracts and Associated Regulations

    Science.gov (United States)

    2010-08-18

    ..., section 4a(a) of the Act authorized the Commission to establish position limits for contracts traded on or... Position Limits for Referenced Energy Contracts and Associated Regulations AGENCY: Commodity Futures... and option contracts based on a limited set of exempt commodities,\\1\\ namely certain energy...

  11. Cost-Sharing Contracts for Energy Saving and Emissions Reduction of a Supply Chain under the Conditions of Government Subsidies and a Carbon Tax

    Directory of Open Access Journals (Sweden)

    Yi Yuyin

    2018-03-01

    Full Text Available To study the cooperation of upstream and downstream enterprises of a supply chain in energy saving and emissions reduction, we establish a Stackelberg game model. The retailer moves first to decide a cost-sharing contract, then the manufacturer determines the energy-saving level, carbon-emission level, and wholesale price successively. In the end, the retailer determines the retail price. As a regulation, the government provides subsidies for energy-saving products, while imposing a carbon tax on the carbon emitted. The results show that (1 both the energy-saving cost-sharing (ECS and the carbon emissions reduction cost-sharing (CCS contracts are not the dominant strategy of the two parties by which they can facilitate energy savings and emissions reductions; (2 compared with single cost-sharing contracts, the bivariate cost-sharing (BCS contract for energy saving and emissions reduction is superior, although it still cannot realise prefect coordination of the supply chain; (3 government subsidy and carbon tax policies can promote the cooperation of both the upstream and downstream enterprises of the supply chain—a subsidy policy can always drive energy saving and emissions reductions, while a carbon tax policy does not always exert positive effects, as it depends on the initial level of pollution and the level of carbon tax; and (4 the subsidy policy reduces the coordination efficiency of the supply chain, while the influences of carbon tax policy upon the coordination efficiency relies on the initial carbon-emission level.

  12. Results of chemical decontamination of DOE`s uranium-enrichment scrap metal

    Energy Technology Data Exchange (ETDEWEB)

    Levesque, R.G.

    1997-02-01

    The CORPEX{reg_sign} Nuclear Decontamination Processes were used to decontaminate representative scrap metal specimens obtained from the existing scrap metal piles located at the Department of Energy (DOE) Portsmouth Gaseous Diffusion Plant (PORTS), Piketon, Ohio. In September 1995, under contract to Lockheed Martin Energy Systems, MELE Associates, Inc. performed the on-site decontamination demonstration. The decontamination demonstration proved that significant amounts of the existing DOE scrap metal can be decontaminated to levels where the scrap metal could be economically released by DOE for beneficial reuse. This simple and environmentally friendly process can be used as an alternative, or in addition to, smelting radiologically contaminated scrap metal.

  13. 20 CFR 1002.7 - How does USERRA relate to other laws, public and private contracts, and employer practices?

    Science.gov (United States)

    2010-04-01

    ... USERRA relate to other laws, public and private contracts, and employer practices? (a) USERRA establishes... law (including any local law or ordinance), contract, agreement, policy, plan, practice, or other... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false How does USERRA relate to other laws, public...

  14. Research on the energy-saving and revenue sharing strategy of ESCOs under the uncertainty of the value of Energy Performance Contracting Projects

    International Nuclear Information System (INIS)

    Qian, Dong; Guo, Ju’e

    2014-01-01

    Under the uncertainty of the value of Energy Performance Contracting Projects (EPCPs), this paper develops a revenue-sharing bargaining model between an Energy Service Company (ESCO) and an Energy-Using Organization (EU). Based on the model the paper analyzes the impacts of energy prices, risk-adjusted discount rates and accidents on the ESCO’s bargaining strategies. The research shows that the greater the probability of adverse circumstances is, the higher is the revenue share (of the EU), and the more disadvantageous is the ESCO’s position in the game. Furthermore, we design a forecast–commitment contract between an ESCO and an EU and analyze the optimal product’s energy savings commitment strategy of the ESCO to cope with uncertain energy savings and contract risk. The research illustrates that by introducing penalties and commitments, the contract can eliminate the impact of the uncertain energy savings on the contract execution to a certain extent; when the EU takes a greater commitment risk, the ESCO is willing to provide a higher commitment, thus enhancing the strategy value of the bilateral relationship and reducing the contract risk. Finally, the policy recommendations about improving shared savings contract standard, third-party energy savings measurement and verification mechanism and arbitration mechanism of EPCs are provided. - Highlights: • We provide a method for determining the revenue-sharing bargaining strategy space in a finite bargaining game of the ESCO. • The increase of the probability of adverse circumstances will increase the revenue share (of the EU). • We design a forecast–commitment contract between an ESCO and an EU. • The forecast–commitment contract can eliminate the impact of the uncertain energy savings on the contract execution to a certain extent. • When the EU takes a greater commitment risk, the ESCO is willing to provide a higher commitment

  15. 41 CFR 105-74.115 - Does this part affect the Federal contracts that I receive?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Does this part affect... Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional Offices-General Services Administration 74-GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE...

  16. The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

    Energy Technology Data Exchange (ETDEWEB)

    Feist, E.T. [Washington Closure Hanford, 2620 Fermi Avenue, Richland, WA 99354 (United States)

    2012-07-01

    Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River

  17. DOE [Department of Energy]-Nuclear Energy Standards Program annual assessment, FY 1990

    International Nuclear Information System (INIS)

    Williams, D.L. Jr.

    1990-11-01

    To meet the objectives of the programs funded by the Department of Energy (DOE)-Nuclear Energy (NE) Technology Support Programs, the Performance Assurance Project Office (PAPO) administers a nuclear standards program and related activities and fosters the development and application of standards. This standards program is carried out in accordance with the principles in DOE Order 1300.2, Department of Energy Standards Program, December 18, 1980. The purposes of this effort, as set forth in three subtasks, are to (1) manage the NE Standards Program, (2) manage the development and maintenance of NE standards, and (3) operate an NE Standards Information Program. This report assesses the Performance Assurance Project Office (PAPO) activities in terms of the objectives of the Department of Energy-Nuclear Energy (DOE-NE) funded programs. To meet these objectives, PAPO administers a nuclear standards program and related activities and fosters the development and application of standards. This task is carried out in accordance with the principles set forth in DOE Order 1300.2, Department of Energy Standards Program, December 18, 1980, and DOE memorandum, Implementation of DOE Orders on Quality Assurance, Standards, and Unusual Occurrence Reporting for Nuclear Energy Programs, March 3, 1982, and with guidance from the DOE-NE Technology Support Programs. 1 tab. (JF)

  18. AERE contracts with DoE on the treatment and disposal of intermediate level wastes

    International Nuclear Information System (INIS)

    Partridge, B.A.

    1984-06-01

    This document reports work carried out in 1983/84 under 10 contracts between DoE and AERE on the treatment and disposal of intermediate level wastes. Individual summaries are provided for each contract report within the document, under the headings: comparative evaluation of α and βγ irradiated medium level waste forms; modelling and characterisation of intermediate level waste forms based on polymers; optimisation of processing parameters for polymer and bitumen modified cements; ceramic waste forms; radionuclide release during leaching; ion exchange processes; electrical processes for the treatment of medium active liquid wastes; fast reactor fuel element cladding; dissolver residues; flowsheeting/systems study. (U.K.)

  19. Expanding Energy Performance Contracting in china: policy solutions and market mechanisms

    Energy Technology Data Exchange (ETDEWEB)

    Shen, Bo [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Price, Lynn [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Liu, Xu [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Meng, Lu [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Shi, Wenjing [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Evans, Meredydd [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Roshchanka, Volha [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Yu, Sha [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-07-19

    Energy performance contracting is an important market mechanism that uses energy savings to pay over time for the upfront costs of energy efficiency retrofits in buildings, industries, and other types of facilities. Through energy performance contracts (EPCs), Energy Service Companies (ESCOs) play an important role in implementing energy efficiency retrofits. Both China and the United States have large markets for EPCs and significant opportunities for growth. The Chinese government has made great efforts in promoting the country’s ESCO business and expanding its EPC markets. This paper makes a series of recommendations for China to adopt more ambitious policy measures to encourage deep energy savings projects via EPCs. These recommendations are built on initial insights from a white paper developed by researchers at the Pacific Northwest National Laboratory and the Lawrence Berkeley National Laboratory with the assistance from the ESCO Committee of China’s Energy Conservation Association (EMCA). Key recommendations are listed below.

  20. 48 CFR 970.1707-4 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1707... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Special Contracting Methods 970.1707-4 Contract clause. Insert the clause at 970.5217-1, Work for Others Program (Non-DOE Funded Work), in any contract...

  1. 48 CFR 952.219-70 - DOE Mentor-Protege program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false DOE Mentor-Protege program... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.219-70 DOE Mentor.... DOE Mentor-Protege Program (MAY 2000) The Department of Energy has established a Mentor-Protege...

  2. Empirical Study on Annual Energy-Saving Performance of Energy Performance Contracting in China

    Directory of Open Access Journals (Sweden)

    Hongquan Ruan

    2018-05-01

    Full Text Available A lack of trust in Energy Service Company (ESCo is the most critical factor affecting the development of Energy Performance Contracting (EPC in China, compared with other constraints. One cannot easily estimate the energy-saving performance of an EPC project. Under that condition, lack of trust may cause the Energy-Consuming Unit (ECU to suspect the energy-saving performance promised by the ESCo, thus leaving potentially profitable projects without necessary funding. Currently, specific studies taking an across-projects viewpoint on annual energy-saving performance of EPC projects in multiple subsectors, objectively and quantitatively, are lacking. This paper studies the regression relationships of annual energy-saving quantity in terms of revamping cost and the regression relationships of annual cost saving in terms of revamping cost. The regression results show that there are statistically significant correlations in the above relationships in the nine subsectors investigated. This is significant for ESCos and ECUs, because knowledge on energy-saving performance could contribute to EPC investment decisions and trust relationships between ESCos and ECUs. Then, a multiple linear regression model of revamping cost is set up to analyze its influencing factors. The model indicates that the subsector the sample belongs to, financing, registered capital of the ESCo, and contract period have significant effects on revamping cost. Thus, policy implications regarding innovation of EE promotion technology, clarifying ESCos’ exit mechanism, innovation of financing mechanism, and improving the market credit environment for promoting investment in EPC projects, are provided.

  3. Energy performance contracting - energy saving potential of selected energy conservation measures (ECM)

    Energy Technology Data Exchange (ETDEWEB)

    Johansson, M. (Dansk Energi Analyse A/S, Frederiksberg (Denmark)); Langkilde, G.; Olesen, Bjarne W. (Technical Univ. of Denmark, ICIEE, Kgs. Lyngby (Denmark)); Moerck, O. (Cenergia Energy Consultants, Herlev (Denmark)); Sundman, O. (DONG Energy, Copenhagen (Denmark)); Engelund Thomsen, K. (Aalborg Univ., SBi, Hoersholm (Denmark))

    2008-09-15

    This report has been developed under the research project 'Etablering af grundlag for energitjenester i Danmark' (project number: ENS-33031-0185) under the Danish research programme - EFP. The objective of this project has been to contribute to the utilisation of the large potential for energy conservations in the building sector within the public, industry and service sectors through the development of a better basis for decision making for both the Energy Service Companies (ESCOes) and the building owners. The EU directive on Energy Service Contracting points at the buildings as the area where the biggest potential market for energy services and energy efficiency improvements are. The EFP-project has two parts: (1) A Danish part and (2) participation in the international cooperation project 'Holistic Assesment Tool-Kit on Energy Efficient Retrofit Measures for Government Buildings (EnERGo)', Annex 46 under the IEA R and D program 'Energy Conservation In Buildings And Community Systems' (ECBCS). This report describes the Danish contributions to the IEA projects subtask B, which has a primary objective to develop a database of energy conservation measures (ECM) with descriptions and performance characteristics of these. (au)

  4. Energy performance contracting - energy saving potential of selected energy conservation measures (ECM)

    Energy Technology Data Exchange (ETDEWEB)

    Johansson, M [Dansk Energi Analyse A/S, Frederiksberg (Denmark); Langkilde, G; Olesen, Bjarne W [Technical Univ. of Denmark, ICIEE, Kgs. Lyngby (Denmark); Moerck, O [Cenergia Energy Consultants, Herlev (Denmark); Sundman, O [DONG Energy, Copenhagen (Denmark); Engelund Thomsen, K [Aalborg Univ., SBi, Hoersholm (Denmark)

    2008-09-15

    This report has been developed under the research project 'Etablering af grundlag for energitjenester i Danmark' (project number: ENS-33031-0185) under the Danish research programme - EFP. The objective of this project has been to contribute to the utilisation of the large potential for energy conservations in the building sector within the public, industry and service sectors through the development of a better basis for decision making for both the Energy Service Companies (ESCOes) and the building owners. The EU directive on Energy Service Contracting points at the buildings as the area where the biggest potential market for energy services and energy efficiency improvements are. The EFP-project has two parts: (1) A Danish part and (2) participation in the international cooperation project 'Holistic Assesment Tool-Kit on Energy Efficient Retrofit Measures for Government Buildings (EnERGo)', Annex 46 under the IEA R and D program 'Energy Conservation In Buildings And Community Systems' (ECBCS). This report describes the Danish contributions to the IEA projects subtask B, which has a primary objective to develop a database of energy conservation measures (ECM) with descriptions and performance characteristics of these. (au)

  5. Accounting for derivative contracts in an energy environment

    International Nuclear Information System (INIS)

    Lewthwaite, T.; Majid, H.; Swingler, N.

    1999-01-01

    This chapter reviews the latest developments in the accounting for derivative contracts in the energy environment, covering the US accounting and disclosure requirements and the Statement of Financial Accounting Standards (SFAS) 133 Accounting for Derivative Instruments and Hedging Activities, and the Emerging Issues Task Force Consensus (EITF) 98-10 accounting for energy trading and risk management activities. UK accounting and disclosure requirements and the international point of view are discussed. Three different types of hedges are described

  6. Accounting for derivative contracts in an energy environment

    Energy Technology Data Exchange (ETDEWEB)

    Lewthwaite, T.; Majid, H.; Swingler, N. [Arthur Andersen (United Kingdom)

    1999-07-01

    This chapter reviews the latest developments in the accounting for derivative contracts in the energy environment, covering the US accounting and disclosure requirements and the Statement of Financial Accounting Standards (SFAS) 133 Accounting for Derivative Instruments and Hedging Activities, and the Emerging Issues Task Force Consensus (EITF) 98-10 accounting for energy trading and risk management activities. UK accounting and disclosure requirements and the international point of view are discussed. Three different types of hedges are described.

  7. Department of Energy (DOE) summary

    International Nuclear Information System (INIS)

    2001-01-01

    An overview was provided of the Generation IV Initiative to evaluate candidate technology concepts for a new generation of nuclear power plants. DOE presented the Generation IV goals, road map effort, and concept evaluation. The formation was discussed of a Near-Term Deployment Working Group (NTDG) formed to identify actions and evaluate options necessary for DOE to support new plants. DOE has established a Nuclear Energy Research Advisory Committee (NERAC) to provide independent evaluation and feedback on the establishment of goals and objectives and progress in evaluating candidate nuclear energy concepts. DOE has also established a Generation IV Road map NERAC Subcommittee (GRNS) to serve as an advisory group in establishing the road map along with a Road map integration Team (RIT). Candidate technologies must be deployable by 2030. Nuclear systems are expected to meet sustainability goals (resource inputs, waste outputs, and nonproliferation), safety and reliability goals (operating maintainability excellence, limiting core damage risk, and reduced need for emergency response), and economic goals (reduced life-cycle costs and risk to capital). Criteria and metrics for each goal are being developed by an Evaluation Methodology Group (EMG), RIT, and the GRNS. DOE plans to evaluate ail candidate concepts equally without prejudice toward existing technologies (e.g., light-water reactors) but recognizes that most primary energy generators are likely to be fission based. DOE is presently considering 94 concepts. The output of the Generation IV Program is expected to be a research and development plan to support future commercialization of the best concepts

  8. 48 CFR 970.0470-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0470... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0470-2 Contract clause. The contracting officer shall insert the clause at 970.5204-2, Laws, Regulations, and DOE...

  9. Public contracts in the Dutch energy sector. A strategic investigation with regard to normalisation

    International Nuclear Information System (INIS)

    Van der Feen, E.J.; Maas, P.J.J.

    1995-01-01

    A number of strategic investigations is carried out to determine if and to what extent normalization of public contracts can support the position of the Dutch businesses and industry in the European market. The strategic investigation in this report is limited to clusters within the Dutch energy utilities' sector concerning the production, transportation and distribution of electricity and heat, and the distribution of natural gas in the Netherlands. The results of this report can support those companies that will acquire orders via public contracts in the future; companies that wish to continue existing relations with tender services, if they will change to public contracts; and tender services that will have to put their orders via public contracts.Relevant European guidelines and accompanying procedures are outlined. The economic interest of the total Dutch energy sector and the different energy clusters in the Netherlands is discussed. Also attention is paid to the process of normalization, the role of standards and other technical documents regarding the guidelines Public Contracts. An inventory of available standards and conceptual standards is given for each energy cluster. Finally, an indication is given of the actual compliance of the guidelines. 5 figs., 4 tabs., 16 appendices

  10. Best in Class Project Management and Contract Management Initiative at the Department of Energy's Office of Environmental Management

    International Nuclear Information System (INIS)

    Van Camp, S.G.; Stevenson, J.S.; Deiters, M.G.

    2009-01-01

    Since its founding in 1989, the U.S. Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. To address this issue, EM has developed a vision for building a 'Best in Class' Project Management and Contract Management (BICPM) organization. To develop the strategy and implement the process to accomplish this vision, EM contracted with the U.S. Army Corps of Engineers (USACE) and their support contractors. EM and the USACE Team developed a five-phased approach to implement the BICPM Initiative: (I) develop assessment criteria, (II) assess existing project and contract management capabilities, (III) develop an implementation plan, (IV) implement corrective actions, and (V) institutionalize BICPM. Under Phases I and II, the USACE Team assessed the status of project and contract management capabilities at 16 EM offices. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and benchmarks and three contract management benchmarks. Under Phase III, EM and the USACE Team developed the Corporate Implementation Plan which identified the key challenges and provided a road-map to address these challenges and to implement BICPM. These challenges included: Federal staffing shortages; integration of project and contract management; further development of project-oriented culture; project baseline maintenance; consistent implementation of the DOE order for project management, 413.3A; and role of EM Headquarters in BICPM. The shortage of qualified resources dedicated to supporting Federal project and contract management functions was identified as a primary cause for project and contract management difficulties within EM. The Corporate Implementation Plan outlined a set of 18 specific Recommended Priority

  11. Specification Section 01065S ES&H for Service Contracts

    Energy Technology Data Exchange (ETDEWEB)

    Kirsch, Greg C. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)

    2014-07-01

    Section Includes: Requirements and guidelines in performance of work concerning protection of environment and property, and the safety and health of Contractors, Sandia National Laboratories (SNL) and Department of Energy (DOE) employees, visitors to SNL, and members of the public. This Section is applicable only to Service Contracts that do not involve construction or construction-like activities. Construction and construction-like activities are covered by Section 01065, Environment, Safety and Health (ES&H) for Construction Contracts. The entire ES&H program shall focus on safe-by-design intent, understanding the technical basis for the work, identifying and controlling energy sources, unacceptable consequences, risk assessments, and positive verification.

  12. Potential for the Use of Energy Savings Performance Contracts to Reduce Energy Consumption and Provide Energy and Cost Savings in Non-Building Applications

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Charles; Green, Andrew S.; Dahle, Douglas; Barnett, John; Butler, Pat; Kerner, David

    2013-08-01

    The findings of this study indicate that potential exists in non-building applications to save energy and costs. This potential could save billions of federal dollars, reduce reliance on fossil fuels, increase energy independence and security, and reduce greenhouse gas emissions. The Federal Government has nearly twenty years of experience with achieving similar energy cost reductions, and letting the energy costs savings pay for themselves, by applying energy savings performance contracts (ESPC) inits buildings. Currently, the application of ESPCs is limited by statute to federal buildings. This study indicates that ESPCs can be a compatible and effective contracting tool for achieving savings in non-building applications.

  13. 48 CFR 937.7040 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 937.7040... CONTRACTING SERVICE CONTRACTING Protective Services Contracting 937.7040 Contract clauses. The contracting... services” in all protective services solicitations and contracts involving DOE-owned facilities requiring...

  14. The lifecycle approach as a driver for innovative power contracting; Der Lifecycle-Ansatz als Treiber fuer innovatives Energie-Contracting

    Energy Technology Data Exchange (ETDEWEB)

    Gayer, Alfred [RWE Energiedienstleistungen GmbH (Germany)

    2011-07-01

    The sensible and efficient use of energy raises more and more the general awareness. The efficiency of projects will be influenced not only by the replacement of existing technology, but also mainly by the general conception of the design of decentralized energy supplies. The integration of waste heat from production-related processes as well as the use of all forms of energy such as electricity, heat, refrigeration and compressed air to meet the customer needs in a comprehensive energy plan increase the complexity and significantly the efficiencies. In the implementation of such projects the contracting is becoming increasingly important because the future gains in efficiency are taken into account directly. Contracting projects include the traditional total-cost-of-ownership approach (lifecycle approach). This approach considers the investment costs as well as the consequential costs of a project and shows how to optimize the total cost.

  15. Manual of contracts for the electricity sector. Contracts that work: Drafting and proper legal application. 2. rev. ed.

    International Nuclear Information System (INIS)

    Schoene, Thomas

    2014-01-01

    This manual deals fundamentally with the drafting of contracts for the electricity sector. It covers all types of contracts on both the customer and the network side with their various special clauses and variants, specifically: basic supply, substitute supply, supply contracts for private, commercial and industrial special customers as well as redistributors, EFET contracts, network access contracts, supplier framework contracts, feed-in contracts, grid connection contracts and connection use contracts. The manual also addresses questions concerning electricity customer insolvency, an issue of growing importance. The following topics are furthermore dealt with in a practically oriented manner and with care being taken to explain the underlying legal issues in readily understandable language. What basic framework conditions are specified by the new energy economy laws and general civil law? What possibilities are available in drafting contracts and what are the ramifications in each case? What subject matters in a contract are of particular economic significance? How can concession contracts be designed in a market-conforming way when there is strong competition for qualified rights of way? What opportunities and risks are associated with innovative products? What options for action does a supplier have in the event of (threatening) customer insolvency? Model contracts from day-to-day management practice and tips, checklists and cautioning notes round off this manual.

  16. Moral hazard contracts: Does one size fit all?

    DEFF Research Database (Denmark)

    Koch, Alexander; Peyrache, Eloic

    2008-01-01

    We show that firms' practice of anonymous contracts ("one-size-fits-all") can be reconciled with standard agency theory if careers are marked by frequent transitions between employers, and agents have career concerns because complete long-term contracts are not feasible.......We show that firms' practice of anonymous contracts ("one-size-fits-all") can be reconciled with standard agency theory if careers are marked by frequent transitions between employers, and agents have career concerns because complete long-term contracts are not feasible....

  17. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    MERCADO, L.C.

    2000-01-01

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects

  18. Residential energy contracts and the 28 day rule

    International Nuclear Information System (INIS)

    Littlechild, Stephen

    2006-01-01

    What measures are needed to protect customers when a utility market is first opened to competition? In the UK, residential (domestic) customers must be able to terminate energy contracts at 28 days' notice. This rule was introduced as a transitional protection for customers and for competition. However, the regulatory justification for the rule seems to have evolved over time. Removing the rule could have a number of advantages, including the development of fixed-price fixed-term contracts. The advantages of retaining the rule are questionable. In other retail sectors there is no regulatory concern or requirement of this kind. UK electricity suppliers have begun to offer capped prices for specified periods of time, suggesting that there is a growing customer demand for this. Fixed-price fixed-term contracts are a common form of competition in Scandinavia. The 28 day rule no longer seems necessary to protect customers and is more likely to distort than to protect competition. In retrospect, it would have been preferable not to introduce the rule in the first place. (author)

  19. Other enrichment related contracts

    International Nuclear Information System (INIS)

    Hall, J.C.

    1978-01-01

    In addition to long-term enrichment contracts, DOE has other types of contracts: (1) short-term, fixed-commitment enrichment contract; (2) emergency sales agreement for enriched uranium; (3) feed material lease agreement; (4) enriched uranium storage agreement; and (5) feed material usage agreement

  20. Nova Scotia electricity market : frameworks for renewable energy contracting and cogeneration contracting : discussion document

    International Nuclear Information System (INIS)

    2006-01-01

    The recent Electricity Marketplace Governance Committee of Nova Scotia report issued a number of recommendations regarding renewable and cogeneration sales to retail consumers, as well as recommendations for top-up, spill rates and back-up rates to complement the operation of independent generating facilities. This discussion paper examined issues which need to be addressed in order to implement the recommendations. The discussion paper also included recommendations relating to the purchase of cogeneration output by the Nova Scotia Power Inc. (NSPI) under long term power purchase agreements. The aim of the paper was to provide a basis for the further discussion of issues in preparation for the development of future rules and regulations. The first part of the document identified ways for buyers and sellers to arrange contracts, as well as issues that need to be addressed at the institutional level to enable arrangements. Options for financial contracts and physical contracts were reviewed.The second part of the document examined pricing issues in the context of both financial and physical contract arrangements. Resolutions for both sets of options were proposed. Energy pricing principles were reviewed, as well as various pricing options and issues related to the analysis of price requirements. It was concluded that in order to support the safe, reliable and economic supply of electricity, the design of the electricity market should enable maximum flexibility in contractual arrangements and facilitate competition in ways that do not harm other parties

  1. Energy Science and Technology Software Center

    Energy Technology Data Exchange (ETDEWEB)

    Kidd, E.M.

    1995-03-01

    The Energy Science and Technology Software Center (ESTSC), is the U.S. Department of Energy`s (DOE) centralized software management facility. It is operated under contract for the DOE Office of Scientific and Technical Information (OSTI) and is located in Oak Ridge, Tennessee. The ESTSC is authorized by DOE and the U.S. Nuclear Regulatory Commission (NRC) to license and distribute DOE-and NRC-sponsored software developed by national laboratories and other facilities and by contractors of DOE and NRC. ESTSC also has selected software from the Nuclear Energy Agency (NEA) of the Organisation for Economic Cooperation and Development (OECD) through a software exchange agreement that DOE has with the agency.

  2. Why radiologists lose their hospital contracts: is your contract secure?

    Science.gov (United States)

    Muroff, Lawrence R

    2010-03-01

    Previously, a hospital contract meant tenure for the incumbent group of radiologists; however, those days are long gone. Exclusive contracts have morphed into exclusive contracts with carve-outs. Turf erosion has become a fact of life for radiology practices. Now radiologists are losing their hospital contracts in record numbers. Group size, though helpful for a variety of reasons, does not ensure that a practice will be secure in its hospital setting. The reasons that groups lose their hospital contracts are varied, and in this paper, the author discusses the most common ones. Suggestions to help practices avoid this unfortunate fate are presented.

  3. Proposed Georgia-Alabama-South Carolina system power marketing policy and subsequent contracts

    International Nuclear Information System (INIS)

    1994-01-01

    This is an Environmental Assessment (Assessment) (DOE/EA-0935) evaluating the Power Marketing Policy and Subsequent Contracts between Southeastern and its customers. The Assessment evaluates two alternatives and the no action alternative. The proposed action is to market the power and energy available in the Georgia-Alabama-South Carolina System during the next ten years, with new power sales contracts of ten-year durations, to the customers set forth in Appendix A of the Assessment. In addition to the proposed alternative, the Assessment evaluates the alternative of extending existing contracts under the current marketing policy

  4. Support services for the Office of Energy efficiency and renewable energy. Quarterly progress report, July 1, 1995--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    R.K. Sen & Associates, Inc., under Contract No. DE-AC01-94CE34027, provides technical and economic analysis support services to the Advanced Utility Concepts Division (AUCD) of DOE. Energetics, Inc. is a subcontractor to R.K. Sen & Associates, Inc. The work performed under this contract is mainly for the DOE Hydrogen R&D Program, although a limited amount of activities are also undertaken for the DOE Battery Energy Storage Program.

  5. Utility Energy Services Contracts Guide

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    The UESC Guide is a compilation of samples and templates developed as a resource to help contracting officers implement task orders for UESCs under existing U.S. General Services Administration areawide contracts.

  6. DOE program guide for universities and other research groups. Part I. DOE Research and Development Programs; Part II. DOE Procurement and Assistance Policies/Procedures

    Energy Technology Data Exchange (ETDEWEB)

    1980-03-01

    This guide addresses the DOE responsibility for fostering advanced research and development of all energy resources, both current and potential. It is intended to provide, in a single publication, all the fundamental information needed by an institution to develop a potential working relationship with DOE. Part I describes DOE research and development programs and facilities, and identifies areas of additional research needs and potential areas for new research opportunities. It also summarizes budget data and identifies the DOE program information contacts for each program. Part II provides researchers and research administrators with an introduction to the DOE administrative policies and procedures for submission and evaluation of proposals and the administration of resulting grants, cooperative agreements, and research contracts. (RWR)

  7. Tiger Team Assessment, Energy Technology Engineering Center

    International Nuclear Information System (INIS)

    1991-04-01

    The Office Special Projects within the Office of Environment, Safety, and Health (EH) has the responsibility to conduct Tiger Team Assessments for the Secretary of Energy. This report presents the assessment of the buildings, facilities, and activities under the DOE/Rockwell Contract No. DE-AM03-76SF00700 for the Energy Technology Engineering Center (ETEC) and of other DOE-owned buildings and facilities at the Santa Susana Field Laboratory (SSFL) site in southeastern Ventura County, California, not covered under Contract No. DE-AM03-76SF00700, but constructed over the years under various other contracts between DOE and Rockwell International. ETEC is an engineering development complex operated for DOE by the Rocketdyne Division of Rockwell International Corporation. ETEC is located within SSFL on land owned by Rockwell. The balance of the SSFL complex is owned and operated by Rocketdyne, with the exception of a 42-acre parcel owned by the National Aeronautics and Space Administration (NASA). The primary mission of ETEC is to provide engineering, testing, and development of components related to liquid metals technology and to conduct applied engineering development of emerging energy technologies

  8. Tiger Team Assessment, Energy Technology Engineering Center

    Energy Technology Data Exchange (ETDEWEB)

    1991-04-01

    The Office Special Projects within the Office of Environment, Safety, and Health (EH) has the responsibility to conduct Tiger Team Assessments for the Secretary of Energy. This report presents the assessment of the buildings, facilities, and activities under the DOE/Rockwell Contract No. DE-AM03-76SF00700 for the Energy Technology Engineering Center (ETEC) and of other DOE-owned buildings and facilities at the Santa Susana Field Laboratory (SSFL) site in southeastern Ventura County, California, not covered under Contract No. DE-AM03-76SF00700, but constructed over the years under various other contracts between DOE and Rockwell International. ETEC is an engineering development complex operated for DOE by the Rocketdyne Division of Rockwell International Corporation. ETEC is located within SSFL on land owned by Rockwell. The balance of the SSFL complex is owned and operated by Rocketdyne, with the exception of a 42-acre parcel owned by the National Aeronautics and Space Administration (NASA). The primary mission of ETEC is to provide engineering, testing, and development of components related to liquid metals technology and to conduct applied engineering development of emerging energy technologies.

  9. Long-term contract auctions and market power in regulated power industries

    International Nuclear Information System (INIS)

    Soledad Arellano, M.; Serra, Pablo

    2010-01-01

    A number of countries with oligopolistic power industries have used marginal cost pricing to set the price of energy for small customers. This course of action, however, does not necessarily ensure an efficient outcome when competition is imperfect. The purpose of this paper is to study how the auction of long-term contracts could reduce market power. We do so in a two-firm, two-technology, linear-cost, static model where demand is summarized by a price inelastic load curve. In this context we show that the larger the proportion of total demand auctioned in advance, the lower are both the contract and the average spot price of energy.

  10. 48 CFR 927.303 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... is a domestic small business or nonprofit organization as defined at (FAR) 48 CFR 27.301, except... contracts for the management and operation of DOE laboratories and production facilities. (b) DOE shall not... its rights in an identified invention pursuant to 10 CFR part 784, contracting officers shall consult...

  11. Energy research at DOE, was it worth it?: energy efficiency and fossil energy research 1978 to 2000

    National Research Council Canada - National Science Library

    2001-01-01

    ... from the R&D conducted since 1978 in DOE's energy efficiency and fossil energy programs. In response to the congressional charge, the National Research Council formed the Committee on Benefits of DOE...

  12. DOE and the United States enrichment market

    International Nuclear Information System (INIS)

    Rutkowski, E.E.

    1993-01-01

    The US Department of Energy (DOE) and its predecessors have exerted a predominant influence in the uranium enrichment services industry since 1969, when it began to sell its services to private industry under a Requirement-Type Contract (RTC). After almost 25 years of providing these services to utilities throughout the world, DOE is now preparing to hand over responsibility to the emerging US Enrichment Corporation (USEC), which was created by the 1992 Energy Bill and will begin its tenure on July 1, 1993. DOE has had some notable successes, including revenue generation of about $25 billion from its domestic and foreign sales since 1969. Annual revenues from civilian dollars over the next several years. However, most of the sales attributed to these revenues took place in 1986-more than six years ago. Presently, US utility commitments are decreasing significantly; to date, US utilities have committed less than two percent of their total FY2002 enrichment requirements to DOE. In spite of the fact that DOE has enjoyed some success, its past actions, or sometimes inactions, have often been steeped in controversy that resulted in customer alienation and dissatisfaction. It is the legacy of past DOE contracting practices, increased competition, and massive contractual terminations, that USEC will inherit from DOE. Therefore, it is relevant to consider the major issues that have fashioned the current US market and resulted in USEC's initial position in the marketplace

  13. 48 CFR 903.971 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 903.971... Contract clause. The contracting officer shall insert the clause at 952.203-70, Whistleblower Protection for Contractor Employees, in contracts that involve work to be done on behalf of DOE directly related...

  14. 48 CFR 925.7004 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 925.7004... FOREIGN ACQUISITION Acquisition of Nuclear Hot Cell Services 925.7004 Contract clause. The contracting... solicitations and contracts involving nuclear hot cell services. This clause does not flow down to second-tier...

  15. Reported Energy and Cost Savings from the DOE ESPC Program: FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    Slattery, Bob S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-01-01

    The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 151 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project.

  16. Eleventh annual report of radiation exposures for DOE and DOE contractor employees

    International Nuclear Information System (INIS)

    1978-01-01

    In 1968, the US Atomic Energy Commission (AEC) established a program for reporting certain occupationa radiation exposure information to a central radiation records repository maintained at the Union Carbide Computing Technology Center, Oak Ridge, Tennessee. Annual summaries (WASH-1350-R1 through WASH-1350-R6) were reported for the years 1968-1973 and included data on AEC contracter employees as well as employees of companies in the private sector licensed by the AEC. In January 1975, the operational functions of the AEC, including the maintenance of records on the occupational radiation exposure on contractor employees, were transferred to the Energy Research and Development Administration (ERDA) and the AEC's regulatory functions, including the reporting of information on the occupational radiation exposure of licenses, were transferred to the Nuclear Regulatory Commission (NRC). Previous AEC licenses then reported to NRC while the contractors reported to ERDA. On October 1, 1977, the Department of Energy (DOE) was formed and assumed the responsibilities of ERDA. This report contains the 1978 radiation exposure data for DOE and DOE contractors

  17. Ensuring Reliable Natural Gas-Fired Generation with Fuel Contracts and Storage - DOE/NETL-2017/1816

    Energy Technology Data Exchange (ETDEWEB)

    Myles, Paul T. [National Energy Technology Lab. (NETL), Albany, OR (United States); Labarbara, Kirk A. [National Energy Technology Lab. (NETL), Albany, OR (United States); Logan, Cecilia Elise [National Energy Technology Lab. (NETL), Albany, OR (United States)

    2017-11-17

    This report finds that natural gas-fired power plants purchase fuel both on the spot market and through firm supply contracts; there do not appear to be clear drivers propelling power plants toward one or the other type. Most natural gas-fired power generators are located near major natural gas transmission pipelines, and most natural gas contracts are currently procured on the spot market. Although there is some regional variation in the type of contract used, a strong regional pattern does not emerge. Whether gas prices are higher with spot or firm contracts varies by both region and year. Natural gas prices that push the generators higher in the supply curve would make them less likely to dispatch. Most of the natural gas generators discussed in this report would be unlikely to enter firm contracts if the agreed price would decrease their dispatch frequency. The price points at which these generators would be unlikely to enter a firm contract depends upon the region that the generator is in, and how dependent that region is on natural gas. The Electric Reliability Council of Texas (ERCOT) is more dependent on natural gas than either Eastern Interconnection or Western Interconnection. This report shows that above-ground storage is prohibitively expensive with respect to providing storage for an extended operational fuel reserve comparable to the amount of on-site fuel storage used for coal-fired plants. Further, both pressurized and atmospheric tanks require a significant amount of land for storage, even to support one day’s operation at full output. Underground storage offers the only viable option for 30-day operational storage of natural gas, and that is limited by the location of suitable geologic formations and depleted fields.

  18. Fossil Energy Program report, 1 October 1976--30 September 1977. [Objectives, progress and plans for each contract or project

    Energy Technology Data Exchange (ETDEWEB)

    Dunning, H. Neal; Batchelor, James; Crim, Winfred; Furlong, Leroy; Harvie, Robert; Hunter, Juanita; Jones, William; Karnes, Anita; Ludwig, Linda; Miller, C. Lowell; Mills, G. Alex; Sacks, Stephen; Watkins, J. Wade; Watson, Coni; Weaver, Val

    1978-08-01

    This report is an integral part of the documentation system of the Fossil Energy Program of the Department of Energy. It contains descriptions of each contract and project, arranged in conformance with planning and budgetary documents. The results of contracts are reported at various intervals, depending on the type of contract, but at least annually. These reports are not listed individually in the ''Publications'' sections but are available from the National Technical Information Service, U.S. Department of Commerce, Springfield, Virginia 22161. The Department of Energy also publishes several abstract journals: Fossil Energy Update, Energy Research Abstracts, and Energy Abstracts for Policy Analysis.

  19. States consider suit if DOE refuses spent fuel

    International Nuclear Information System (INIS)

    Zeyher, A.

    1994-01-01

    Michigan, Florida, and Minnesota were joined by Wisconsin on April 21 in the Nuclear Waste Strategy Coalition (NWSC), a group of utilities, state regulators, and state attorneys general that have banded together to decide what to do about the Department of Energy's apparent intention to renege on its obligation to begin taking title to spent nuclear fuel by January 31, 1998. According to Ronald Russell, a commissioner on the Michigan Public Service Commission and cofounder of the NWSC, another six states have expressed interest in joining the coalition. open-quotes We're looking at encouraging the DOE to step up to its legal responsibility to take nuclear spent fuel by 1998,close quotes Russell said. The objectives of the coalition include asking the DOE to support privatization of nuclear storage, to review the management of the final repository program in order to make it more efficient, and to identify legislative changes that the DOE might feel are necessary for it to accomplish its charge. The NWSC is also considering filing a lawsuit in response to the DOE's open-quotes anticipatory breach of an executory contract.close quotes The NWSC and others feel that the Nuclear Waste Policy Act of 1982 and the related standard contracts between the DOE and the utilities form a legal contract for the DOE to take the spent fuel on the agreed upon date

  20. 48 CFR 970.2210 - Service Contract Act.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Service Contract Act. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2210 Service Contract Act. The Service Contract Act of 1965 is not applicable to contracts for the management and operation of...

  1. Salinity Gradient Energy from Expansion and Contraction of Poly(allylamine hydrochloride) Hydrogels.

    Science.gov (United States)

    Bui, Tri Quang; Cao, Vinh Duy; Do, Nu Bich Duyen; Christoffersen, Trine Eker; Wang, Wei; Kjøniksen, Anna-Lena

    2018-06-22

    Salinity gradients exhibit a great potential for production of renewable energy. Several techniques such as pressure-retarded osmosis and reverse electrodialysis have been employed to extract this energy. Unfortunately, these techniques are restricted by the high costs of membranes and problems with membrane fouling. However, the expansion and contraction of hydrogels can be a new and cheaper way to harvest energy from salinity gradients since the hydrogels swell in freshwater and shrink in saltwater. We have examined the effect of cross-linker concentration and different external loads on the energy recovered for this type of energy-producing systems. Poly(allylamine hydrochloride) hydrogels were cross-linked with glutaraldehyde to produce hydrogels with excellent expansion and contraction properties. Increasing the cross-linker concentration markedly improved the energy that could be recovered from the hydrogels, especially at high external loads. A swollen hydrogel of 60 g could recover more than 1800 mJ when utilizing a high cross-linker concentration, and the maximum amount of energy produced per gram of polymer was 3.4 J/g. Although more energy is recovered at high cross-linking densities, the maximum amount of energy produced per gram of polymer is highest at an intermediate cross-linking concentration. Energy recovery was reduced when the salt concentration was increased for the low-concentration saline solution. The results illustrate that hydrogels are promising for salinity gradient energy recovery, and that optimizing the systems significantly increases the amount of energy that can be recovered.

  2. Contracting for Efficiency. A Best Practices Guide for Energy-Efficient Product Procurement

    Energy Technology Data Exchange (ETDEWEB)

    Bunch, Saralyn [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States); Payne, Christopher [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-04-01

    The requirement to buy energy- and water-efficient products applies to federal purchases made through any procurement pathway (e.g., purchase cards, e-retailers, and solicitations) and to a wide variety of federal projects. The Federal Energy Management Program’s (FEMP's) Buy Energy-Efficient Products buyer overview fact sheet and Contracting for Efficiency best practices guide for product procurement are designed to support federal buyers in the purchase of energy- and water-efficient products.

  3. Contracting for Efficiency: A Best Practices Guide for Energy Efficient Product Procurement

    Energy Technology Data Exchange (ETDEWEB)

    Bunch, Saralyn [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States); Payne, Christopher [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-11-01

    The requirement to buy energy- and water-efficient products applies to federal purchases made through any procurement pathway (e.g., purchase cards, e-retailers, and solicitations) and to a wide variety of federal projects. The Federal Energy Management Program’s (FEMP's) Buy Energy-Efficient Products buyer overview fact sheet and Contracting for Efficiency best practices guide for product procurement are designed to support federal buyers in the purchase of energy- and water-efficient products.

  4. 48 CFR 970.1706-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1706... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Special Contracting Methods 970.1706-2 Contract clause. The contracting officer shall insert the clause at 48 CFR 52.217-9, Option to Extend the Term of...

  5. Energy from wastes and the private waste contracting industry

    International Nuclear Information System (INIS)

    Burnett, J.S.

    1993-01-01

    The focus of this ongoing work is the utilisation of general non hazardous industrial and commercial waste as an energy or fuel source. Whereas much of the existing experience in energy from waste (EFW) is related to municipal solid wastes (MSW), there is very little direct experience with these other waste streams and the shortage of reliable information in this field is notoriously lacking. It is important to have a good understanding of the private waste contracting industry (pwci) in order to establish the conditions under which energy from waste technologies may play an economically and technically feasible role within that industry's development. The Non Fossil Fuel Obligation (NFFO) has encouraged entrepreneurial interest through premium payments for electricity generated from renewable sources. (author)

  6. US DOE International energy policy on Russia

    Energy Technology Data Exchange (ETDEWEB)

    Gale, B.G.

    1996-04-01

    This report describes the importance of the United States Department of Energy`s (US DOE) International Energy Policy to Russia. Key objectives identified include the support of the transition to democracy and a market based economy. The U.S.interests at stake, importance of energy to Russia, key institutional mechanism, energy-policy committee, joint energy activities, and the key to the success of other U.S. policy are discussed.

  7. Report on high energy neutron dosimetry workshop

    International Nuclear Information System (INIS)

    Alvar, K.R.; Gavron, A.

    1993-01-01

    The workshop was called to assess the performance of neutron dosimetry per the responses from ten DOE accelerator facilities to an Office of Energy Research questionnaire regarding implementation of a personnel dosimetry requirement in DRAFT DOE 5480.ACC, ''Safety of Accelerator Facilities''. The goals of the workshop were to assess the state of dosimetry at high energy accelerators and if such dosimetry requires improvement, to reach consensus on how to proceed with such improvements. There were 22 attendees, from DOE Programs and contract facilities, DOE, Office of Energy Research (ER), Office of Environmental Safety and Health (EH), Office of Fusion Energy, and the DOE high energy accelerator facilities. A list of attendees and the meeting agenda are attached. Copies of the presentations are also attached

  8. The Contracting Parties' Ability To Conclude The Employment Contract

    Directory of Open Access Journals (Sweden)

    Carmen Constantina NENU

    2014-08-01

    Full Text Available This study's main objective is to analyze certain effects produced by the changes of the Labor Code and by the entry into force of the current Romanian Civil Code. These effects refer to one of the fundamental conditions for the valid conclusion of the individual employment contract, that is, to the legal capacity of employers and employees. Thus, a complete analysis of legal regulations and of the correlations between different provisions on the legal capacity of parties to the individual employment contract is required to identify the existing noncompliance and to propose solutions. The research demonstrated that the current regulatory framework governing the legal capacity of the parties to an individual employment contract does not entirely correspond to the social reality. Therefore, only the employer benefits from a relatively comprehensive statutory regulation on the legal capacity to conclude an individual employment contract. The employee, however, does not benefit from the same attention from legislature. Considering the above, the study represents a significant scientific contribution, whose value lies in the proposed changes to modify legislature, so that the legal capacity of job holders would benefit from fair regulation, in accordance with the principle of legal protection of employee rights.

  9. Radiation exposures for DOE [Department of Energy] and DOE contractor employees, 1988

    International Nuclear Information System (INIS)

    Merwin, S.E.; Traub, R.J.; Millet, W.H.

    1990-12-01

    This is the 21st in a series of annual radiation exposure reports published by the Department of Energy (DOE) or its predecessors. This report summarizes the radiation exposures received at DOE and DOE contractor facilities in 1988. Radiation exposures to both employees and visitors are included. Trends in radiation exposures are evaluated by comparing the doses received in 1988 to those received in previous years. The significance of the doses is addressed by comparing them to the DOE limits and by correlating the doses to health risks based on risk estimates from expert groups. This report represents a significant advancement from previous reports because it is the first for which detailed exposure data are available for each individual monitored at a DOE facility. This reports contains information on different types of radiation doses, such as penetrating, shallow, and neutron doses. It also contains analysis of exposures by age, sex, and occupation of the exposed individuals. This report is the first of any federal organization that presents such detailed exposure data. The purpose of this report is to disseminate information regarding radiation exposures received at US Department of Energy (DOE) and DOE contractor facilities. The primary purpose of this practice is to ensure that the DOE occupational dose limits are not exceeded and that as low as reasonably achievable (ALARA) goals are met. A secondary purpose, however, is to provide information that can be used by other organizations and individuals who wish to collect and analyze such information. This information may be useful for estimating the effect of changing dose limits on operations at DOE facilities, determining the progress of DOE with respect to the ALARA principle, or, in combination with epidemiological information, assisting researchers in determining whether or not low doses of ionizing radiation are harmful. 23 refs., 20 figs., 23 tabs

  10. Financing Solar Energy Systems with Energy Savings Performance Contracts in the Federal Sector: Results of a Survey on Barriers

    Energy Technology Data Exchange (ETDEWEB)

    Gee, R. C.; LaPorta, C.

    1999-08-17

    This report summarizes the findings of an investigation into financing solar energy systems for the Federal sector. The objectives of the investigation were (1) to identify the barriers that impede companies from using Energy Savings Performance Contracts (ESPCs) to develop solar energy projects for Federal facilities, and (2) to clarify the impacts of Federal contracting requirements on energy service companies' use of ESPCs. Twenty-four representatives of energy service companies agreed to be interviewed. Their responses indicate that these are the primary barriers to greater use of ESPCs: the relatively long payback periods for investments in solar technologies; the length of the ESPC process; the cost of certain contractual requirements regarding wages and financing; and a lack of knowledge about the actual cost and reliability of solar systems. The report proposes a number of actions the government could take to remove these barriers, including (1) streamlining and shortening the ESPC process and (2) doing more to inform both government agencies and energy service companies about the costs and benefits of solar systems.

  11. 40-Hz square-wave stimulation requires less energy to produce muscle contraction: compared with the TASER® X26 conducted energy weapon.

    Science.gov (United States)

    Comeaux, James A; Jauchem, James R; Cox, D Duane; Crane, Carrie C; D'Andrea, John A

    2013-07-01

    Conducted energy weapons (CEWs) (including the Advanced TASER(®) X26 model produced by TASER International, Inc.) incapacitate individuals by causing muscle contractions. In this study using anesthetized swine, the potential incapacitating effect of primarily monophasic, 19-Hz voltage imposed by the commercial CEW was compared with the effect of voltages imposed by a laboratory device that created 40-Hz square waves. Forces of muscle contraction were measured with the use of strain gauges. Stimulation with 40-Hz square waves required less pulse energy than stimulation with the commercial CEW to produce similar muscle contraction. The square-pulse stimulation, at the higher repetition rate, caused a more complete tetanus at a lower energy. Use of such a simple shape of waveform may be used to make future nonlethal weapon devices more efficient. © 2013 American Academy of Forensic Sciences Published 2013. This article is a U.S. Government work and is in the public domain in the U.S.A.

  12. 48 CFR 970.0371-9 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0371... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371-9 Contract clause. The contracting officer shall insert the clause at 970...

  13. 48 CFR 970.1103-4 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1103... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1103-4 Contract clause. Insert the clause at 48 CFR 52.211-5, Material Requirements, in solicitations and contracts. ...

  14. 48 CFR 970.0370-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0370... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0370-2 Contract clause. (a) The contracting officer shall insert the clause at 970...

  15. 48 CFR 970.1170-2 - Contract provision.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract provision. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1170-2 Contract provision. The Contracting Officer shall insert the clause at 970.5211-1, Work authorization, in each...

  16. Renewable Energy Contract Development Best Practices

    Science.gov (United States)

    This page provides information on how available resources can help organizations effectively navigate the solar contract development process with the goal of RFP and contract transparency, completeness, and accountability of all involved parties.

  17. 48 CFR 970.0808-3 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0808... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Required sources of supplies and services 970.0808-3 Contract clause. The contracting officer shall insert the clause at 970.5208-1, Printing, in all...

  18. Manual of contracts for the electricity sector. Contracts that work: Drafting and proper legal application. 2. rev. ed.; Vertragshandbuch Stromwirtschaft. Praxisgerechte Gestaltung und rechtssichere Anwendung

    Energy Technology Data Exchange (ETDEWEB)

    Schoene, Thomas (ed.)

    2014-07-01

    This manual deals fundamentally with the drafting of contracts for the electricity sector. It covers all types of contracts on both the customer and the network side with their various special clauses and variants, specifically: basic supply, substitute supply, supply contracts for private, commercial and industrial special customers as well as redistributors, EFET contracts, network access contracts, supplier framework contracts, feed-in contracts, grid connection contracts and connection use contracts. The manual also addresses questions concerning electricity customer insolvency, an issue of growing importance. The following topics are furthermore dealt with in a practically oriented manner and with care being taken to explain the underlying legal issues in readily understandable language. What basic framework conditions are specified by the new energy economy laws and general civil law? What possibilities are available in drafting contracts and what are the ramifications in each case? What subject matters in a contract are of particular economic significance? How can concession contracts be designed in a market-conforming way when there is strong competition for qualified rights of way? What opportunities and risks are associated with innovative products? What options for action does a supplier have in the event of (threatening) customer insolvency? Model contracts from day-to-day management practice and tips, checklists and cautioning notes round off this manual.

  19. Short-term versus long-term contracting for uranium enrichment services

    International Nuclear Information System (INIS)

    Rudy, G.P.

    1990-01-01

    The US Department of Energy (US DOE) is the world's largest and most experienced supplier of uranium enrichment services. Through the late 1970s and early 1980s, emerging market forces transformed what was once a monopoly into a highly competitive industry. In the early 1980's the DOE lost market share. But as we enter the 1990s, new market forces have emerged. The US DOE believes a responsible balance between long-term and short-term contracting will be the key to success and the key to assuring the long-term health and reliability of the nuclear fuel industry. The US DOE intends to be in this nuclear business for a long time and will continue to offer reliable and responsive services second to none

  20. Proceedings of the DOE chemical energy storage and hydrogen energy systems contracts review

    Energy Technology Data Exchange (ETDEWEB)

    1980-02-01

    Sessions were held on electrolysis-based hydrogen storage systems, hydrogen production, hydrogen storage systems, hydrogen storage materials, end-use applications and system studies, chemical heat pump/chemical energy storage systems, systems studies and assessment, thermochemical hydrogen production cycles, advanced production concepts, and containment materials. (LHK)

  1. 42 CFR 137.410 - For the purposes of section 110 of the Act [25 U.S.C. 450m-1] does the term contract include...

    Science.gov (United States)

    2010-10-01

    ....C. 450m-1] does the term contract include compacts, funding agreements, and construction project... the term contract include compacts, funding agreements, and construction project agreements entered into under Title V? Yes, for the purposes of section 110 of the Act [25 U.S.C. 450m-1] the term...

  2. Energy efficiency performance contracts in the school environment; Contrats de performance energetique dans le milieu scolaire

    Energy Technology Data Exchange (ETDEWEB)

    Drouin, J. [Quebec Ministere de l' Education, Ste-Foy, PQ (Canada)

    1999-12-01

    An overview of new regulations concerning the awarding of energy performance contracts by school boards in the province of Quebec is provided. The article deals with buildings belonging to boards of education that are wholly or primarily utilised for educational purposes. It provides an inventory of such buildings and statistical information about about energy consumption and energy-related costs of educational facilities during the school years 1996/1997 and 1997/1998. Regarding the new regulations, the principal change appears to be that school boards are required to award construction or building services contracts estimated to cost between $50,000 and $100,000 either by public requests for tenders, or by invitation; construction or building services contracts whose cost exceeds $100,000 must be awarded by public tender. In effect, to meet the energy efficiency criteria specified in the new regulations, school boards are obliged to call for bids on any project that contribute to the energy efficiency of school buildings whose cost is estimated to exceed $50,000. The objective of the new regulation is to encourage the consideration of energy efficiency standards by school boards, and by potential contractors. The regulations also prescribe the method of requesting bids and specifies the energy efficiency criteria bidders must meet in order to be eligible.

  3. DOE's energy data base (EDB) versus other energy-related data bases: a comparative analysis

    International Nuclear Information System (INIS)

    Robinson, J.; Hu, M.

    1981-02-01

    The release of the DOE Energy Data Base to commercial services in 1980 raised an immediate question in the minds of some searchers: how does this new data base fit into the spectrum of already-available data bases. Because the authors have been closely associated with the Department of Energy's RECON system and its data bases for several years, as trainers and as editor of the DOE/RECON Newsletter, the question was of great interest and we decided to investigate it

  4. DOE Zero Energy Ready Home Case Study: Amaris Custom Homes, St.Paul, Minnesota; DOE Zero Energy Ready Home Case Study, Energy Efficiency & Renewable Energy (EERE)

    Energy Technology Data Exchange (ETDEWEB)

    2015-06-01

    For this project Amaris worked with U.S. Department of Energy (DOE) team, NorthernSTAR Building America Partnership, to approach zero energy in Minnesota's cold climate using reasonable, cost-effective, and replicable construction materials and practices. The result is a passive solar, super-efficient 3542-ft2 walkout rambler with all the creature comforts.

  5. Republic of Korea Reduction of Financing Barriers for Energy Savings Performance Contracts

    Energy Technology Data Exchange (ETDEWEB)

    Howard, D. L.

    2005-11-01

    This paper discusses the findings developed for strengthening the role of performance contracting in improving energy efficiency in the Republic of Korea. The U.S. Environmental Protection Agency (EPA) sponsored development of this paper by the National Renewable Energy Laboratory (NREL), as a part of the Korean-U.S. Climate Technology Partnerships (CTP) program. The results and recommendations outlined in this paper together with other efforts are designed to assist other countries striving to improve their efficient use of energy.

  6. Does Contract Complexity Limit Opportunities? Vertical Organization and Flexibility

    NARCIS (Netherlands)

    H.P.G. Pennings (Enrico)

    2010-01-01

    textabstractThe vertical organization of production entails a range of make-or-buy decisions of intermediate goods that are influenced by the difficulty of writing contracts with a potential supplier. When contracting causes high transaction costs, a firm can decide to vertically integrate the

  7. Program management: The keys to a successful ERWM contract

    International Nuclear Information System (INIS)

    Lenyk, R.G.; Cusack, J.G.

    1995-01-01

    Program management for a large Environmental Restoration and Waste Management (ERWM) task order contract is both a skill and an art. Unlike project management, program management deals with global and political issues, with both client and home organizations, as well as with day-to-day operations. Program management requires up-front planning and nurturing, for no contract matures successfully by itself. This paper identifies the many opportunities presented in the planning and initial implementation of the contract. Potential traps are identified so that they can be recognized and avoided or mitigated. Teaming and subcontracting are also addressed. The authors rely on years of program management experience to explore such questions as the following: Can you have an integrated team? What needs to be done before you sign Your contract? Do you know who your client(s) is(are)? Have you incorporated the relevant, especially any new, procurement strategies? The US Department of Energy-Oak Ridge Operations (DOE-ORO) ERWM Remedial Design Contract with Foster Wheeler Environmental Corporation is used as a model for exploring these topics. This ERWM Program-which focuses on the Oak Ridge National Laboratory, the Y-12 Weapons Plant, and the K-25 Site in Oak Ridge, Tennessee; the Paducah Gaseous Diffusion Plant in Paducah, Kentucky; and the Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio-is in its fifth year with over 225 task orders. The program has been highly successful and has obtained from DOE outstanding marks for achieving quality, responsiveness, timeliness, and subcontracting goals

  8. Bilateral electric energy contracts: return and risk

    Energy Technology Data Exchange (ETDEWEB)

    Gunn, Laura K.; Silva, Elisa B.; Correia, Paulo B. [State University of Campinas (UNICAMP), SP (Brazil). College of Mechanical Engineering

    2009-07-01

    In Brazil electricity is traded through three segments: the spot market that balances offer and demand, with prices calculated by a cost-based computational model; the regulated market , where prices are settled in public auctions, and the free market for bilateral contracts. As spot and regulated market prices are public information, a seller is able to calculate his opportunity price to trade a bilateral contract in the free market by using the non-arbitrage principle. Thus, the seller searches the price of a bilateral contract in the free market that balances his/her revenues with the value expected in case it were negotiated in the regulated and the spot market. Besides the expected revenue, the seller may also consider the CVaR to measure the risk of her/his bilateral contract in the free market. So this paper develops a binomial lattice approach to price bilateral contracts in the free market, considering the seller's opportunity of negotiations in both regulated and spot markets, and measuring the contract risk directly. (author)

  9. White Paper: Unleashing Energy Efficiency Retrofits Through Energy Performance Contracts in China and the United States

    Energy Technology Data Exchange (ETDEWEB)

    Shen, Bo [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Price, Lynn [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Liu, Manzhi [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Meng, Lu [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Miao, Pei [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Dai, Fan [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Evans, Meredydd [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Yu, Sha [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Roshchanka, Volha [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Halverson, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-09-15

    Energy performance contracting (EPC) is a mechanism that uses private sector investment and expertise to deploy energy efficiency retrofits in buildings, industries, and other types of facilities. China and the United States both have large, growing EPC markets. This White Paper shares key insights on each market, including strengths and barriers inherent to these markets, compares the two markets, and sets forth options for enhancing EPC markets in each country. The White Paper concludes with recommendations structured around common goals of both countries.

  10. Scientists warn DOE of dwindling funding

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    Fusion scientists have raised their voices to let the Department of Energy know that they are concerned about the DOE's commitment to fusion research. In a letter dated February 28, 1994, 37 scientists from 21 institutions noted that open-quotes US funding for fusion has steadily decreased: It is now roughly half its level of 1980. This peculiar and painful circumstance has forced the program to contract drastically, losing skilled technical personnel, even as it faces its most exciting opportunities.close quotes The letter was addressed to Martha Krebs, the DOE's director of the Office of Energy Research, and N. Anne Davies, associated director for fusion energy. The scientists wanted to make two points. The first was that fusion energy research, only midway between concept and commercialization, deserves major reinvestment. The second was that basic scientific knowledge in the area of fusion, not just applied engineering, must remain a priority

  11. U.S. Department of Energy photovoltaic energy program contract summary, fiscal year 1999

    Energy Technology Data Exchange (ETDEWEB)

    Surek, T.; Hansen, A.

    2000-02-17

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the National Center for Photovoltaics (NCPV) and US Department of Energy (DOE) National Photovoltaics Program from October 1, 1998, through September 30, 1999 (FY 1999). The mission of the DOE National Photovoltaics Program is to make PV a significant part of the domestic economy as an industry and an energy resource. The two primary goals of the national program are to (1) maintain the US industry's world leadership in research and technology development and (2) help the US industry remain a major, profitable force in the world market. The NCPV is part of the National PV Program and provides leadership and support to the national program toward achieving its mission and goals.

  12. U.S. Department of Energy photovoltaic energy program contract summary, fiscal year 1999

    International Nuclear Information System (INIS)

    Surek, T.; Hansen, A.

    2000-01-01

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the National Center for Photovoltaics (NCPV) and US Department of Energy (DOE) National Photovoltaics Program from October 1, 1998, through September 30, 1999 (FY 1999). The mission of the DOE National Photovoltaics Program is to make PV a significant part of the domestic economy as an industry and an energy resource. The two primary goals of the national program are to (1) maintain the US industry's world leadership in research and technology development and (2) help the US industry remain a major, profitable force in the world market. The NCPV is part of the National PV Program and provides leadership and support to the national program toward achieving its mission and goals

  13. DOE standard: The Department of Energy Laboratory Accreditation Program for radiobioassay

    International Nuclear Information System (INIS)

    1998-12-01

    This technical standard describes the US Department of Energy Laboratory Accreditation Program (DOELAP) for Radiobioassay, for use by the US Department of Energy (DOE) and DOE Contractor radiobioassay programs. This standard is intended to be used in conjunction with the general administrative technical standard that describes the overall DOELAP accreditation process--DOE-STD-1111-98, Department of Energy Laboratory Accreditation Program Administration. This technical standard pertains to radiobioassay service laboratories that provide either direct or indirect (in vivo or in vitro) radiobioassay measurements in support of internal dosimetry programs at DOE facilities or for DOE and DOE contractors. Similar technical standards have been developed for other DOELAP dosimetry programs. This program consists of providing an accreditation to DOE radiobioassay programs based on successful completion of a performance-testing process and an on-site evaluation by technical experts. This standard describes the technical requirements and processes specific to the DOELAP Radiobioassay Accreditation Program as required by 10 CFR 835 and as specified generically in DOE-STD-1111-98

  14. DOE-HUD initiative on energy efficiency in housing: A federal partnership

    Energy Technology Data Exchange (ETDEWEB)

    Brinch, J. [Energetics, Inc., Columbia, MD (United States); Ternes, M. [Oak Ridge National Lab., TN (United States); Myers, M. [USDOE, Washington, DC (United States)

    1996-07-01

    A five-year initiative between the US Department of Energy (DOE) and the US Department of Housing and Urban Development (HUD) demonstrated the feasibility of improving the energy efficiency of publicly-assisted housing. Twenty-seven projects and activities undertaken during 1990--95 involved research and field demonstrations, institutional and administrative changes to HUD policies and procedures, innovative financing and leveraging of federal dollars with non-federal money, and education, training, and technical assistance. With most of the 27 projects and activities completed, the two departments have initiated a five-year deployment effort, the DOE-Energy Partnerships for Affordable Homes, to achieve energy and water savings in public and assisted housing on a large scale throughout the country. A Clearinghouse for Energy Efficiency in Public and Assisted Housing managed by the National Center for Appropriate Technology (NCAT), will offer hands-on energy assistance to housing providers to complement DOE`s assistance. This paper presents the findings of the DOE-HUD Initiative, with primary attention paid to those projects which successfully integrated energy efficiency into private and public single and multifamily housing. The paper includes examples of the publications, case-study reports, exhibits and videotapes developed during the course of the Initiative. Information on the new DOE Energy Partnerships and on the NCAT Clearinghouse is also presented. New Partnership projects with the Atlanta and Chicago Housing Authorities describe the technical assistance envisioned under the Partnership.

  15. Energy Efficiency Investments in Public Facilities - Developing a Pilot Mechanism for Energy Performance Contracts (EPCs) in Russia

    Energy Technology Data Exchange (ETDEWEB)

    Evans, Meredydd; Roshchanka, Volha; Parker, Steven A.; Baranovskiy, Aleksandr

    2012-02-01

    : Russian public sector buildings tend to be very inefficient, which creates vast opportunities for savings. This report overviews the latest developments in the Russian legislation related to energy efficiency in the public sector, describes the major challenges the regulations pose, and proposes ways to overcome these challenges. Given Russia’s limited experience with energy performance contracts (EPCs), a pilot project can help test an implementation mechanism. This paper discusses how EPCs and other mechanisms can help harness energy savings opportunities in Russia in general, and thus, can be applicable to any Russian region.

  16. 48 CFR 927.409 - Solicitation provisions and contract clauses. (DOE coverage-paragraphs (a), (h), (s), and (t))

    Science.gov (United States)

    2010-10-01

    ... Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND... formatted as a computer data base. (8) Unlimited rights, as used in this clause, means the rights of the...

  17. Report on inspection regarding small business contracting statistics reporting and presentation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    On September 11, 1995, the Office of Inspections, Office of Inspector General (OIG), Department of Energy (DOE), received an allegation regarding the accuracy of the Department`s small business contracting statistics in the Secretary of Energy`s Fiscal Year (FY) 1995 Performance Agreement with the President, entitled: {open_quotes}Performance Agreement Between the President of the United States William Jefferson Clinton and the Secretary of Energy Hazel R. O`Leary.{close_quotes} It was alleged that the FY 1995 Performance Agreement incorrectly communicated that the Department intended to increase small business contracting from 25 percent in FY 1994 to more than 34 percent in FY 1995. We subsequently received additional allegations that the Office of Economic Impact and Diversity (ED) had not issued a required annual report to Congress on the Department`s small business program since 1992 as required by the Department of Energy Act of 1978--Civilian Applications, as amended by Public Law 96-470, and may have provided incorrect information for use in Secretarial presentations on the Department`s small business program.

  18. Forecast of contracting and subcontracting opportunities: Fiscal year 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    This report describes procurement procedures and opportunities for small businesses with the Department of Energy (DOE). It describes both prime and subcontracting opportunities of $100,000 and above which are being set aside for 8(a) and other small business concerns. The report contains sections on: SIC codes; procurement opportunities with headquarters offices; procurement opportunities with field offices; subcontracting opportunities with major contractors; 8(a) contracts expiring in FY 1998; other opportunities to do business with DOE; management and operating contractors--expiration dates; Office of Small and Disadvantaged Business Utilization (OSDBU) staff directory; and small business survey. This document will be updated quarterly on the home page.

  19. 48 CFR 970.0407-1-3 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0407... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0407-1-3 Contract clause. The contracting officer shall insert the clause at 970.5204-3, Access to and Ownership of Records...

  20. International offshore petroleum contracts: Towards the compatibility of energy need and sustainable development

    International Nuclear Information System (INIS)

    Gao Zhiguo.

    1993-01-01

    The legal and commercial relationships between petroleum producing countries and foreign oil companies have been defined by traditional oil concession agreements before the 1950s, and since then by modern petroleum contracts. The development policies behind the evolution of various arrangements for offshore petroleum exploration are scrutinized. By studying examples of contracts in four developing countries (Thailand, Indonesia, Brazil, and China), the issues of mutuality of interests and environmental sustainability that are reflected in both the structure and substance of modern petroleum contracts are examined. Major findings are that modern petroleum contracts are generally able to achieve and maintain a necessary balance of rights, interests and benefits between the contracting parties, but have failed to produce any balance between the extraction of resources and environmental sustainability. The existing contractual systems have failed in principle to provide adequate environmental regulation and have not addressed the issue of sustainable development at all. Arrangements focusing on economic interests are inappropriate for future energy developments, but through the proper use of contract terms that contain elements favouring sustainable development, economic and environmental interests can nevertheless be accomodated and served at the same time. Future petroleum agreements should recognize explicitly the inherent independence and coexistence between commerciality and sustainable development. 288 refs., 1 fig., 24 tabs

  1. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  2. Selected DOE Headquarters publications received by the Energy Library

    International Nuclear Information System (INIS)

    1978-07-01

    This bibliography provides listings of (mainly policy and programmatic) publications issued from the U.S. Department of Energy, Washington, D.C. The listings are arranged by the ''report code'' assigned to the major organizations at DOE Headquarters, followed by the three categories of environmental reports issued from DOE Headquarters. All of the publications listed, except for those shown as still ''in preparation,'' may be seen in the Energy Library. A title index arranged by title keywords follows the listings. Certain publications have been omitted. They include such items as pamphlets, ''fact sheets,'' bulletins and weekly/monthly issuances of DOE's Energy Information Administration and Economic Regulatory Administration, and employee bulletins and newsletters. Omitted from the bibliography altogether are headquarters publications assigned other types of report codes--e.g., ''HCP'' (Headquarters Contractor Publication) and ''CONF''

  3. DOE plutonium disposition study: Pu consumption in ALWRs

    International Nuclear Information System (INIS)

    1993-01-01

    The Department of Energy (DOE) has contracted with Asea Brown Boveri-Combustion Engineering (ABB-CE) to provide information on the capability of ABB-CE's System 80 + Advanced Light Water Reactor (ALWR) to transform, through reactor burnup, 100 metric tonnes (MT) of weapons grade plutonium (Pu) into a form which is not readily useable in weapons. This information is being developed as part of DOE's Plutonium Disposition Study, initiated by DOE in response to Congressional action. This document Volume 2, provides a discussion of: Plutonium Fuel Cycle; Technology Needs; Regulatory Considerations; Cost and Schedule Estimates; and Deployment Strategy

  4. Energy Innovation Portal Brings DOE Technologies to the Market (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2011-10-01

    For venture capitalists, energy entrepreneurs, and industry veterans, finding the right renewable energy or energy efficiency solution used to be like looking for a needle in a haystack. Now, a searchable treasure trove of innovative U.S. Department of Energy (DOE) technologies is available. Created by the National Renewable Energy Laboratory (NREL), the online Energy Innovation Portal helps businesses and entrepreneurs access the intellectual property of DOE's 17 national laboratories and other research partners.

  5. How does innovation work within the developmental network state? New data on public-private agreements in a U.S. Department of Energy laboratory

    Directory of Open Access Journals (Sweden)

    Matthew R. Keller

    Full Text Available Abstract The value of the Department of Energy (DOE-owned national laboratories to the U.S. national innovation system has long been a subject of debate. Advocates have drawn attention to the central role of the labs in the development of technologies including advanced batteries, solar energy breakthroughs, imaging technologies, and various IT endeavors, among others. Critics have recurrently suggested that the labs’ innovative capacities have been undermined by a lack of engagement with commercial firms and managerial tactics. Perhaps surprisingly, what has often been missing from the debate is a thorough review of data on the public-private partnerships in which the labs engage with private firms. This paper draws on heretofore non-public data on one type of contractual arrangement - Work-For-Others (WFO agreements - in which the labs perform contract work for private firms. We review 10 years of WFO data for a single DOE laboratory. Our analysis provides an initial picture of the surprisingly diverse geography and array of firms that employed the labs as contract R&D providers, as well as of key characteristics of these agreements. Although our data capture only a single laboratory’s agreements, the findings reinforce the importance of looking at the complex, overlapping network of programs within the U.S. federal system that support private sector innovation.

  6. Manipulation of Cash-Settled Futures Contracts.

    OpenAIRE

    Pirrong, Craig

    2001-01-01

    Replacement of delivery settlement of futures contracts with cash settlement is frequently proposed to reduce the frequency of market manipulation. This article shows that it is always possible to design a delivery-settled futures contract that is less susceptible to cornering by a large long than any given cash-settled contract. Such a contract is more susceptible to manipulation by large shorts, however. Therefore, cash settlement does not uniformly dominate delivery settlement as a means o...

  7. A Conceptual Framework for B2B Electronic Contracting

    NARCIS (Netherlands)

    Angelov, S.A.; Grefen, P.W.P.J.; Luis, M.; Camarinha, M.

    Business-to-business e-contracting has gained attention in recent years as a way to improve traditional paper contracting. However, a complete framework specifying the aspects of improvement of traditional paper contracting and the new opportunities introduced by e-contracting still does not exist.

  8. Making contracting work better and cost less: Report of the Contract Reform Team

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In June 1993, Secretary of Energy Hazel O`Leary formed a Contract Reform Team, chaired by Deputy Secretary Bill White, to evaluate the contracting practices of the Department of Energy and to formulate specific proposals for improving those practices. This report summarizes the results of the work of the Contract Reform Team. It recommends actions for implementation that will significantly improve the Department`s contracting practices and will enable the Department to help create a government that -- in the words of Vice President Gore -- {open_quotes}works better and costs less.{close_quotes} These actions and the deadlines for their implementation are listed. Among other things, they recommend replacing the Department`s standard Management and Operating Contract with a new Performance-Based Management Contract and strengthening the Department`s systems for selecting and managing contractors.

  9. DOE Solar Energy Technologies Program 2007 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    2008-07-01

    The DOE Solar Energy Technologies Program FY 2007 Annual Report chronicles the R&D results of the U.S. Department of Energy Solar Energy Technologies Program from October 2006 to September 2007. In particular, the report describes R&D performed by the Program's national laboratories (National Renewable Energy Laboratory, Sandia National Laboratories, Oak Ridge National Laboratory, and Brookhaven National Laboratory) and university and industry partners.

  10. A novel three-filament model of force generation in eccentric contraction of skeletal muscles.

    Directory of Open Access Journals (Sweden)

    Gudrun Schappacher-Tilp

    Full Text Available We propose and examine a three filament model of skeletal muscle force generation, thereby extending classical cross-bridge models by involving titin-actin interaction upon active force production. In regions with optimal actin-myosin overlap, the model does not alter energy and force predictions of cross-bridge models for isometric contractions. However, in contrast to cross-bridge models, the three filament model accurately predicts history-dependent force generation in half sarcomeres for eccentric and concentric contractions, and predicts the activation-dependent forces for stretches beyond actin-myosin filament overlap.

  11. DOE Energy Challenge Project

    Energy Technology Data Exchange (ETDEWEB)

    Frank Murray; Michael Schaepe

    2009-04-24

    Project Objectives: 1. Promote energy efficiency concepts in undergraduate and graduate education. 2. Stimulate and interest in pulp and paper industrial processes, which promote and encourage activities in the area of manufacturing design efficiency. 3. Attract both industrial and media attention. Background and executive Summary: In 1997, the Institute of Paper Science and Technology in conjunction with the U.S. Department of Energy developed a university design competition with an orientation to the Forest Products Industry. This university design competition is in direct alignment with DOE’s interests in instilling in undergraduate education the concepts of developing energy efficient processes, minimizing waste, and providing environmental benefits and in maintaining and enhancing the economic competitiveness of the U.S. forest products industry in a global environment. The primary focus of the competition is projects, which are aligned with the existing DOE Agenda 2020 program for the industry and the lines of research being established with the colleges comprising the Pulp and Paper Education and Research Alliance (PPERA). The six design competitions were held annually for the period 1999 through 2004.

  12. Theoretical basis of the DOE-2 building energy use analysis program

    Science.gov (United States)

    Curtis, R. B.

    1981-04-01

    A user-oriented, public domain, computer program was developed that will enable architects and engineers to perform design and retrofit studies of the energy-use of buildings under realistic weather conditions. The DOE-2.1A has been named by the US DOE as the standard evaluation technique for the Congressionally mandated building energy performance standards (BEPS). A number of program design decisions were made that determine the breadth of applicability of DOE-2.1. Such design decisions are intrinsic to all building energy use analysis computer programs and determine the types of buildings or the kind of HVAC systems that can be modeled. In particular, the weighting factor method used in DOE-2 has both advantages and disadvantages relative to other computer programs.

  13. Europe of energy: a contract to be urgently re-founded

    International Nuclear Information System (INIS)

    Maisonneuve, Cecile

    2014-04-01

    In a first part, the author analyses and discusses the present situation of energy in Europe, and wanders whether it will turn to be something like a chaos foretold. The author notably outlines the too slow implementation of the European gas market, wanders about the actual existence of an electricity market, and outlines the weakened credibility of the European energy policy. In a second part, the author proposes a further analysis of this crisis of the European energy and tries to identify its origins and to show that, although ambitious, this project was founded on neither an actual vision nor means. Ambiguities of the Lisbon Treaty are outlined. The behaviour of member States is described as the triumph of the 'every-man for himself' principle, and the author wanders about the ability of the Commission in the search of a balanced position. In the third part, the author proposes guidelines for a re-foundation of the European energy contract. These guidelines are: to base the European energy policy on solidarity and sustainability, to favour the use of all energy sources by introducing a political coordination between member States, and to put the Directorate General for Energy (DG Energy or ENER) at the heart of the governance of the European energy policy

  14. 76 FR 55217 - Procedures for Protests and Contracts Dispute

    Science.gov (United States)

    2011-09-07

    ... an alleged breach of that contract. A contract dispute does not require, as a prerequisite, the...-0840; Amdt. No. 17-1] RIN 2120-AJ82 Procedures for Protests and Contracts Dispute AGENCY: Federal... contract disputes brought against or by the FAA. It also adds a voluntary dispute avoidance and early...

  15. Implementation of the best in class project management and contract management initiative at the Department Of Energy's Office Of Environmental Management - 16062

    International Nuclear Information System (INIS)

    Van Camp, Scott G.; Stevenson, Jeremy S.; Deiters, Michael G.; Jamison, Timothy P.

    2009-01-01

    Since its creation in 1989, the Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project management and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. EM has committed itself to improving project performance and undertaken a number of proactive management initiatives including the development of a 'Best in Class' Project Management and Contract Management organization (i.e., the BICPM Initiative). During 2007, EM assessed the status of project management and contract management at 15 EM sites. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and three contract management benchmarks. The January 2008 Compilation Assessment Report showed that EM faces significant challenges in its mission execution due to staffing shortages, project and contract management integration, insufficient project-oriented culture, and lack of a clear role for Headquarters in BICPM. EM then formulated a strategy to meet their objectives in the March 2008 Corporate Implementation Plan. It summarizes BICPM efforts, introduces the vision for BICPM, identifies the strategy for achieving BICPM, and describes a process for implementing BICPM. That is, it acts as a road-map to address EM's challenges. It also documents 18 Recommended Priority Actions (RPAs) that are the key to correcting these challenges. These RPAs provide a clear path forward that can be communicated to the entire EM organization and provide the foundation upon which a BICPM culture can be built. EM has since gained considerable momentum and progress towards institutionalizing BICPM. This paper provides a discussion of the BICPM Initiative and its implementation. (authors)

  16. 75 FR 63450 - DOE/NSF High Energy Physics Advisory Panel

    Science.gov (United States)

    2010-10-15

    ... DEPARTMENT OF ENERGY DOE/NSF High Energy Physics Advisory Panel AGENCY: Department of Energy.../NSF High Energy Physics Advisory Panel (HEPAP). Federal Advisory Committee Act (Pub. L. 92-463, 86... 20852. FOR FURTHER INFORMATION CONTACT: John Kogut, Executive Secretary; High Energy Physics Advisory...

  17. DOE and NASA joint Dark Energy mission

    CERN Multimedia

    2003-01-01

    "DOE and NASA announced their plan for a Joint Dark Energy Mission (JDEM) on October 23, 2003, at the NASA Office of Space Science Structure and Evolution of the Universe Subcommittee (SEUS) meeting" (1 paragraph).

  18. 78 FR 69839 - DOE/NSF High Energy Physics Advisory Panel

    Science.gov (United States)

    2013-11-21

    ... DEPARTMENT OF ENERGY DOE/NSF High Energy Physics Advisory Panel AGENCY: Department of Energy.../NSF High Energy Physics Advisory Panel (HEPAP). The Federal Advisory Committee Act (Pub. L. 92-463, 86... CONTACT: John Kogut, Executive Secretary; High Energy Physics Advisory Panel; U.S. Department of Energy...

  19. 75 FR 57463 - DOE/NSF High Energy Physics Advisory Panel

    Science.gov (United States)

    2010-09-21

    ... DEPARTMENT OF ENERGY DOE/NSF High Energy Physics Advisory Panel AGENCY: Department of Energy.../NSF High Energy Physics Advisory Panel (HEPAP). Federal Advisory Committee Act (Pub. L. 92-463, 86... Secretary; High Energy Physics Advisory Panel; U.S. Department of Energy; SC-25/ Germantown Building, 1000...

  20. 77 FR 4027 - DOE/NSF High Energy Physics Advisory Panel

    Science.gov (United States)

    2012-01-26

    ... DEPARTMENT OF ENERGY DOE/NSF High Energy Physics Advisory Panel AGENCY: Department of Energy.../NSF High Energy Physics Advisory Panel (HEPAP). The Federal Advisory Committee Act (Pub. L. 92-463, 86... Secretary; High Energy Physics Advisory Panel; U.S. Department of Energy; SC-25/ Germantown Building, 1000...

  1. 76 FR 41234 - DOE/NSF High Energy Physics Advisory Panel

    Science.gov (United States)

    2011-07-13

    ... DEPARTMENT OF ENERGY DOE/NSF High Energy Physics Advisory Panel AGENCY: Department of Energy.../NSF High Energy Physics Advisory Panel (HEPAP). The Federal Advisory Committee Act (Pub. L. 92-463, 86... Secretary; High Energy Physics Advisory Panel; U.S. Department of Energy; SC-25/ Germantown Building, 1000...

  2. 76 FR 8358 - DOE/NSF High Energy Physics Advisory Panel

    Science.gov (United States)

    2011-02-14

    ... DEPARTMENT OF ENERGY DOE/NSF High Energy Physics Advisory Panel AGENCY: Department of Energy.../NSF High Energy Physics Advisory Panel (HEPAP). Federal Advisory Committee Act (Pub. L. 92-463, 86... Secretary; High Energy Physics Advisory Panel; U.S. Department of Energy; SC-25/ Germantown Building, 1000...

  3. 48 CFR 916.307 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 916.307 Section 916.307 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 916.307 Contract clauses. (g) Insert the...

  4. Analysis of Contracting Processes, Internal Controls, and Procurement Fraud Schemes

    Science.gov (United States)

    2013-06-01

    buyer to answer include the following: 6  Does the organization want to buy or lease a product?  Does the organization want to completely...who as commander of U.S. Army Contracting Command-Korea, took thousands of dollars in bribes from contractors for favorable treatment in contract

  5. 76 FR 2035 - Procedures for Protests and Contracts Dispute

    Science.gov (United States)

    2011-01-12

    ... an alleged breach of that contract. A contract dispute does not require, as a prerequisite, the...-0840; Notice No. 10-18] RIN 2120-AJ82 Procedures for Protests and Contracts Dispute AGENCY: Federal... brought against the FAA and contract disputes brought against or by the FAA. It would also add a voluntary...

  6. 77 FR 64799 - DOE/NSF High Energy Physics Advisory Panel

    Science.gov (United States)

    2012-10-23

    ... DEPARTMENT OF ENERGY DOE/NSF High Energy Physics Advisory Panel AGENCY: Department of Energy... Physics Advisory Panel (HEPAP). Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires... Kogut, Executive Secretary; High Energy Physics Advisory Panel; U.S. Department of Energy; SC-25...

  7. 78 FR 46330 - DOE/NSF High Energy Physics Advisory Panel

    Science.gov (United States)

    2013-07-31

    ... DEPARTMENT OF ENERGY DOE/NSF High Energy Physics Advisory Panel AGENCY: Office of Science... High Energy Physics Advisory Panel (HEPAP). Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat... CONTACT: John Kogut, Executive Secretary; High Energy Physics Advisory Panel; U.S. Department of Energy...

  8. 76 FR 19986 - DOE/NSF High Energy Physics Advisory Panel

    Science.gov (United States)

    2011-04-11

    ... DEPARTMENT OF ENERGY DOE/NSF High Energy Physics Advisory Panel AGENCY: Department of Energy.../NSF High Energy Physics Advisory Panel (HEPAP). The Federal Advisory Committee Act (Pub. L. 92-463, 86... FURTHER INFORMATION CONTACT: John Kogut, Executive Secretary; High Energy Physics Advisory Panel; U.S...

  9. Federal Research Opportunities: DOE, DOD, and HHS Need Better Guidance for Participant Activities

    Science.gov (United States)

    2016-01-01

    contract with DOE and the Economy Act of 1932, as amended. In addition, we examined documents developed by ORAU and used by DOE, DOD, and HHS to set forth...energy and climate change policy and analyses in the international economy , and building efficiencies. Environmental Protection Agency Climate...biomarkers for environmental contaminants. Federal Bureau of Investigation Juvenile prostitution and child abduction, causes of postmortem hair root

  10. 48 CFR 970.35 - Research and development contracting.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Research and development... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Major System Acquisition 970.35 Research and development contracting. ...

  11. DOE technical standards list: Department of Energy standards index

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    This Department of Energy (DOE) technical standards list (TSL) has been prepared by the Office of Nuclear Safety Policy and Standards (EH-31) on the basis of currently available technical information. Periodic updates of this TSL will be issued as additional information is received on standardization documents being issued, adopted, or canceled by DOE. This document was prepared for use by personnel involved in the selection and use of DOE technical standards and other Government and non-Government standards. This TSL provides listings of current DOE technical standards, non-Government standards that have been adopted by DOE, other standards-related documents in which DOE has a recorded interest, and canceled DOE technical standards. Information on new DOE technical standards projects, technical standards released for coordination, recently published DOE technical standards, and activities of non-Government standards bodies that may be of interest to DOE is published monthly in Standards Actions.

  12. 10 CFR 603.1300 - Procurement contract.

    Science.gov (United States)

    2010-01-01

    ... Used in this Part § 603.1300 Procurement contract. A Federal Government procurement contract. It is a... 10 Energy 4 2010-01-01 2010-01-01 false Procurement contract. 603.1300 Section 603.1300 Energy... Government and a State, a local government, or other non-government entity when the principal purpose of the...

  13. 77 FR 33449 - DOE/NSF High Energy Physics Advisory Panel

    Science.gov (United States)

    2012-06-06

    ... DEPARTMENT OF ENERGY DOE/NSF High Energy Physics Advisory Panel AGENCY: Office of Science... High Energy Physics Advisory Panel (HEPAP). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat..., Executive Secretary; High Energy Physics Advisory Panel; U.S. Department of Energy; SC-25/ Germantown...

  14. Financial audit: DOE Uranium Enrichment Activity financial statements - September 30, 1984

    International Nuclear Information System (INIS)

    1986-01-01

    In GAO's opinion the Department of Energy did not comply with the terms and provisions of laws and regulations for the financial transactions tested. Specifically, DOE did not comply with the Atomic Energy Act of 1954, as amended, requiring the Uranium Enrichment Activity to recover the cost of its operations when setting prices to be charged to its customers. Also, DOE's actions concerning its new utility services contract were not in compliance with applicable statutory principles. UEA did not amend its pricing criteria as required by the Atomic Energy Act, as amended. Consequently UEA did not comply with the 45-day notification to the appropriate congressional oversight committees as also required by the act

  15. 29 CFR 4.111 - Contracts “to furnish services.”

    Science.gov (United States)

    2010-07-01

    ... McNamara-O'Hara Service Contract Act Covered Contracts Generally § 4.111 Contracts “to furnish services.” (a) “Principal purpose” as criterion. Under its terms, the Act applies to a “contract * * * the... performed are only incidental to the performance of a contract for another purpose, the Act does not apply...

  16. AHP-based risk analysis of energy performance contracting projects in Russia

    International Nuclear Information System (INIS)

    Garbuzova-Schlifter, Maria; Madlener, Reinhard

    2016-01-01

    Understanding and properly managing risks that could potentially affect the target- and performance-based profits of energy performance contracting (EPC) projects are essential. It is particularly important for the establishment and success of energy service companies (ESCOs) acting in the vulnerable environment of the vast but highly energy-inefficient Russian market. This study systematically explores common risk factors and causes of risk associated with EPC projects executed in three Russian sectors: (1) industrial; (2) housing and communal services; and (3) public. Several interviews with the Russian EPC experts were accomplished and a qualitative risk assessment by using an analytic hierarchy process (AHP) approach. The data were obtained from a web-based questionnaire survey conducted among Russian EPC project executors. For each focus sector, a specific preference-based ranking of the identified risk factors and causes of risk was derived. The AHP results show that causes of risk related to the financial and regulatory aspects contribute most to the riskiness of EPC projects performed in all three focus sectors in Russia, calling for the special attention of EPC policy- and business-makers. Due to sectorial particularities and different actors involved, we conclude that there is a need for elaboration of sector-specific contractual schemes for EPC projects. - Highlights: • AHP- and survey-based study of energy performance contracting (EPC) projects in Russia. • Main risk factors and causes of risk associated with EPC projects are investigated. • In practice, lack of a feasible risk management approach in EPC projects. • Regulatory and financial risks contribute most to the EPC projects’ riskiness. • Elaboration of the sector-specific EPC project contractual scheme is required.

  17. Reversal of fortune for industry in DOE low-level waste decision

    International Nuclear Information System (INIS)

    Lobsenz, G.

    1994-01-01

    Thanks to the Energy Department, states have triumphed over industry groups in a battle over the disposition of surcharge money collected for low-level radioactive waste disposal. In a March 31 announcement, the Energy Department ruled against industry groups seeking to prevent certain states from receiving partial rebates of surcharge money collected by DOE from generators of low-level radioactive waste. The rebated money would have gone back to generators had DOE sided with the industry groups, which included the Edison Electric Institute. The surcharge issue became controversial when some states decided to sign 18-month contracts with South Carolina to continue sending waste shipments to an existing disposal site at Barnwell, SC. South Carolina was the only one of three states with an existing low-level disposal site to keep it open to outside shipments; Nevada and Washington closed their disposal sites in June 1992 to all states outside their regional compacts. Industry groups charged that the 18-month contracts for disposal at Barnwell did not meet the statutory requirements for states to receive the surcharge rebates. They maintained the law effectively required states to develop new disposal capacity, rather than continuing to rely on Barnwell or the other two existing sites under a limited duration contract. DOE rejected that reasoning, saying that while the law was designed to encourage new capacity, it did not require it for compliance with the January 1993 milestone

  18. 48 CFR 970.2201-1-3 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.2201... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2201-1-3 Contract clause. In addition to the clause at 48 CFR 52.222-1, Notice to the Government of Labor Disputes...

  19. Avoiding surety contracts in bankruptcy procedure

    Directory of Open Access Journals (Sweden)

    Hiber Dragor

    2015-01-01

    Full Text Available Serbia's courts jurisprudence has divergent attitudes with respect to the dilemma whether a surety contract represents a contract without consideration, which may be avoided once the guarantor is subject to bankruptcy procedure without any additional conditions, or an onerous contract. Whether a surety contract is an onerous one has anyhow been disputed in the legal theory. One school of thought considers this contract as non-onerous one, since vis-a-vis guarantor's obligation no benefit to be expected from the other contractual party (i. e. creditor exists. The other school of thought understands surety (almost always as an onerous contract bearing in mind that the guarantor who enters into this contract does not have intentio liberalis. There are numerous and nuanced views based on analyses of the relation between a guarantor and a debtor focused on the argument that surety is a contract without consideration if intentio liberalis existed vis-a-vis main debtor rather than vis-a-vis creditor. Our legal literature did not pay much attention to that issue until recently. In a rare text dedicated to it the author's basic standpoint is that surety represents a contract without consideration. An exception, depending on the circumstances of the case, could be surety given by a parent company for the obligation of a subsidiary, provided the former reasonably expected a benefit in terms of an increase in the value of shares. Commercial courts followed such reasoning. In this article an opposite stance has been argued. Namely, the onerousness of surety must be assessed based on the relation between the guarantor and the main debtor rather than between the guarantor and the creditor. As a rule, surety is an onerous contract because the guarantor expects to collect from the debtor through subrogation the amount he paid to the creditor; exceptionally, surety may be a non-onerous contract if intentio liberalis existed vis-a-vis main debtor. However, this

  20. Long-term energy supply contracts in European competition policy: Fuzzy not crazy

    International Nuclear Information System (INIS)

    Hauteclocque, Adrien de; Glachant, Jean-Michel

    2009-01-01

    Long-term supply contracts often have ambiguous effects on the competitive structure, investment and consumer welfare in the long term. In the new market context, these effects are likely to be worsened and thus even harder to assess. Since liberalization and especially since the release of the Energy Sector Inquiry in early 2007, the portfolio of long-term supply contracts of the former incumbents have become a priority for review by the European Commission and the national competition authorities. It is widely believed that European Competition authorities take a dogmatic view on these contracts and systemically emphasize the risk of foreclosure over their positive effects on investment and operation. This paper depicts the methodology that has emerged in the recent line of cases and argues that this interpretation is largely misguided. It shows that a multiple-step approach is used to reduce regulation costs and balance anti-competitive effects with potential efficiency gains. However, if an economic approach is now clearly implemented, competition policy is constrained by the procedural aspect of the legal process and the remedies imposed remain open for discussion.

  1. Increased muscle glucose uptake during contractions

    DEFF Research Database (Denmark)

    Ploug, Thorkil; Galbo, Henrik; Richter, Erik

    1984-01-01

    We reinvestigated the prevailing concept that muscle contractions only elicit increased muscle glucose uptake in the presence of a so-called "permissive" concentration of insulin (Berger et al., Biochem. J. 146: 231-238, 1975; Vranic and Berger, Diabetes 28: 147-163, 1979). Hindquarters from rats...... in severe ketoacidosis were perfused with a perfusate containing insulin antiserum. After 60 min perfusion, electrical stimulation increased glucose uptake of the contracting muscles fivefold. Also, subsequent contractions increased glucose uptake in hindquarters from nondiabetic rats perfused for 1.5 h......-methylglucose uptake increased during contractions and glucose uptake was negative at rest and zero during contractions. An increase in muscle transport and uptake of glucose during contractions does not require the presence of insulin. Furthermore, glucose transport in contracting muscle may only increase if glycogen...

  2. The North Sea contracting industry

    International Nuclear Information System (INIS)

    Wright, P.J.C.

    1996-09-01

    The North Sea Contracting Industry provides in-depth profiles of major contracting organisations including manpower, facilities, expertise, future directions and financial details. It addresses key issues such as: how will the role of operators and contractors change toward 2000 and beyond?; how will the contractor-operator relationship develop?; will the contractors take a more speculative role in projects such as leasing and contract to produce?; does the future belong to broad skilled providers or small specialised niche players, or both?; and how will rapid technological improvements affect the industry? (author)

  3. Energy Transformation in Molecular Electronic Systems

    Energy Technology Data Exchange (ETDEWEB)

    Kasha, Michael

    1999-05-17

    This laboratory has developed many new ideas and methods in the electronic spectroscopy of molecules. This report covers the contract period 1993-1995. A number of the projects were completed in 1996, and those papers are included in the report. The DOE contract was terminated at the end of 1995 owing to a reorganizational change eliminating nationally the projects under the Office of Health and Environmental Research, U. S. Department of Energy.

  4. DOE plutonium disposition study: Pu consumption in ALWRs. Volume 2, Final report

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-15

    The Department of Energy (DOE) has contracted with Asea Brown Boveri-Combustion Engineering (ABB-CE) to provide information on the capability of ABB-CE`s System 80 + Advanced Light Water Reactor (ALWR) to transform, through reactor burnup, 100 metric tonnes (MT) of weapons grade plutonium (Pu) into a form which is not readily useable in weapons. This information is being developed as part of DOE`s Plutonium Disposition Study, initiated by DOE in response to Congressional action. This document Volume 2, provides a discussion of: Plutonium Fuel Cycle; Technology Needs; Regulatory Considerations; Cost and Schedule Estimates; and Deployment Strategy.

  5. Public Internal Performance Contracting - Managing and financing energy-efficiency measures in public administrations

    International Nuclear Information System (INIS)

    Irrek, Wolfgang; Thomas, Stefan; Attali, Sophie; Benke, Georg; Borg, Nils; Figorski, Arkadiusz; Filipowicz, Mariusz; Labanca, Nicola; Pindar, Andrew; Ochoa, Amalia

    2005-01-01

    Public Internal Performance Contracting (PICO) is a type of in-house 'third-party' financing or energy performance contracting scheme. In theory, once triggered, PICO provides a 'perpetual motion' finance mechanism for public authorities by which energy efficiency savings fund new investments in an upward virtuous cycle. One unit of the public authority, e.g. the technical department, delivers the financial and technical energy efficiency service to another unit of the same public administration. Remuneration takes place through cross payments between these units, according savings made in energy costs. The initial investments require 'seed funds' to kick start the process, after which the cross payments provide sufficient means to fund further measures. How can the PICO mechanism be initiated in times of tight public budgets? What difficulties are faced during the implementation process and how can these be overcome? What kind of energy-efficiency measures is PICO best suited to? And what role can national and European policy play to facilitate implementation? These are the key questions that the EU-funded PICOLight project aimed to tackle. This was done through testing and disseminating the PICO schemes, first used in Germany, in six European countries, developing these further and making the necessary adaptations. PICO schemes were piloted in seven public administrations with the technical focus on energy-efficient lighting retrofits. The experiences gathered in these pilot projects should help to introduce PICO schemes on a larger scale in public administrations in Europe. The paper presents the preliminary results from these pilot projects

  6. RESULTS FROM THE U.S. DOE 2006 SAVE ENERGY NOW ASSESSMENT INITIATIVE: DOE's Partnership with U.S. Industry to Reduce Energy Consumption, Energy Costs, and Carbon Dioxide Emissions

    Energy Technology Data Exchange (ETDEWEB)

    Wright, Anthony L [ORNL; Martin, Michaela A [ORNL; Gemmer, Bob [U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy; Scheihing, Paul [U.S. Department of Energy, Industrial Technologies Program; Quinn, James [U.S. Department of Energy

    2007-09-01

    In the wake of Hurricane Katrina and other severe storms in 2005, natural gas supplies were restricted, prices rose, and industry sought ways to reduce its natural gas use and costs. In October 2005, U.S. Department of Energy (DOE) Energy Secretary Bodman launched his Easy Ways to Save Energy campaign with a promise to provide energy assessments to 200 of the largest U.S. manufacturing plants. A major thrust of the campaign was to ensure that the nation's natural gas supplies would be adequate for all Americans, especially during home heating seasons. In a presentation to the National Press Club on October 3, 2005, Secretary Bodman said: 'America's businesses, factories, and manufacturing facilities use massive amounts of energy. To help them during this period of tightening supply and rising costs, our Department is sending teams of qualified efficiency experts to 200 of the nation's most energy-intensive factories. Our Energy Saving Teams will work with on-site managers on ways to conserve energy and use it more efficiently.' DOE's Industrial Technologies Program (ITP) responded to the Secretary's campaign with its Save Energy Now initiative, featuring a new and highly cost-effective form of energy assessments. The approach for these assessments drew heavily on the existing resources of ITP's Technology Delivery component. Over the years, ITP-Technology Delivery had worked with industry partners to assemble a suite of respected software decision tools, proven assessment protocols, training curricula, certified experts, and strong partnerships for deployment. Because of the program's earlier activities and the resources that had been developed, ITP was prepared to respond swiftly and effectively to the sudden need to promote improved industrial energy efficiency. Because of anticipated supply issues in the natural gas sector, the Save Energy Now initiative strategically focused on natural gas savings and targeted the

  7. Arctic Energy Technology Development Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Sukumar Bandopadhyay; Charles Chamberlin; Robert Chaney; Gang Chen; Godwin Chukwu; James Clough; Steve Colt; Anthony Covescek; Robert Crosby; Abhijit Dandekar; Paul Decker; Brandon Galloway; Rajive Ganguli; Catherine Hanks; Rich Haut; Kristie Hilton; Larry Hinzman; Gwen Holdman; Kristie Holland; Robert Hunter; Ron Johnson; Thomas Johnson; Doug Kame; Mikhail Kaneveskly; Tristan Kenny; Santanu Khataniar; Abhijeet Kulkami; Peter Lehman; Mary Beth Leigh; Jenn-Tai Liang; Michael Lilly; Chuen-Sen Lin; Paul Martin; Pete McGrail; Dan Miller; Debasmita Misra; Nagendra Nagabhushana; David Ogbe; Amanda Osborne; Antoinette Owen; Sharish Patil; Rocky Reifenstuhl; Doug Reynolds; Eric Robertson; Todd Schaef; Jack Schmid; Yuri Shur; Arion Tussing; Jack Walker; Katey Walter; Shannon Watson; Daniel White; Gregory White; Mark White; Richard Wies; Tom Williams; Dennis Witmer; Craig Wollard; Tao Zhu

    2008-12-31

    The Arctic Energy Technology Development Laboratory was created by the University of Alaska Fairbanks in response to a congressionally mandated funding opportunity through the U.S. Department of Energy (DOE), specifically to encourage research partnerships between the university, the Alaskan energy industry, and the DOE. The enabling legislation permitted research in a broad variety of topics particularly of interest to Alaska, including providing more efficient and economical electrical power generation in rural villages, as well as research in coal, oil, and gas. The contract was managed as a cooperative research agreement, with active project monitoring and management from the DOE. In the eight years of this partnership, approximately 30 projects were funded and completed. These projects, which were selected using an industry panel of Alaskan energy industry engineers and managers, cover a wide range of topics, such as diesel engine efficiency, fuel cells, coal combustion, methane gas hydrates, heavy oil recovery, and water issues associated with ice road construction in the oil fields of the North Slope. Each project was managed as a separate DOE contract, and the final technical report for each completed project is included with this final report. The intent of this process was to address the energy research needs of Alaska and to develop research capability at the university. As such, the intent from the beginning of this process was to encourage development of partnerships and skills that would permit a transition to direct competitive funding opportunities managed from funding sources. This project has succeeded at both the individual project level and at the institutional development level, as many of the researchers at the university are currently submitting proposals to funding agencies, with some success.

  8. 78 FR 12043 - DOE/NSF High Energy Physics Advisory Panel

    Science.gov (United States)

    2013-02-21

    ... DEPARTMENT OF ENERGY DOE/NSF High Energy Physics Advisory Panel AGENCY: Office of Science... High Energy Physics Advisory Panel (HEPAP). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat... INFORMATION CONTACT: John Kogut, Executive Secretary; High Energy Physics Advisory Panel; U.S. Department of...

  9. DOE Solar Energy Technologies Program FY 2006 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    2007-07-01

    The DOE Solar Energy Technologies Program FY 2006 Annual Report chronicles the R&D results of the U.S. Department of Energy Solar Energy Technologies Program for Fiscal Year 2005. In particular, the report describes R&D performed by the Program's national laboratories (National Renewable Energy Laboratory, Sandia National Laboratories, Oak Ridge National Laboratory, and Brookhaven National Laboratory) and university and industry partners.

  10. DOE Solar Energy Technologies Program: FY 2004 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    2005-10-01

    The DOE Solar Energy Technologies Program FY 2004 Annual Report chronicles the R&D results of the U.S. Department of Energy Solar Energy Technologies Program for Fiscal Year 2004. In particular, the report describes R&D performed by the Program's national laboratories (National Renewable Energy Laboratory, Sandia National Laboratories, Oak Ridge National Laboratory, and Brookhaven National Laboratory) and university and industry partners.

  11. DOE Solar Energy Technologies Program FY 2005 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    2006-03-01

    The DOE Solar Energy Technologies Program FY 2005 Annual Report chronicles the R&D results of the U.S. Department of Energy Solar Energy Technologies Program for Fiscal Year 2005. In particular, the report describes R&D performed by the Program?s national laboratories (National Renewable Energy Laboratory, Sandia National Laboratories, Oak Ridge National Laboratory, and Brookhaven National Laboratory) and university and industry partners.

  12. Single-Family Energy Auditor Job Task Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Head, Heather R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kurnik, Charles W [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-05-02

    The National Renewable Energy Laboratory (NREL) is contracted by the U.S. Department of Energy (DOE) Weatherization Assistance Program (WAP) to develop and maintain the resources under the Guidelines for Home Energy Professionals (GHEP) project. As part of the GHEP strategy to increase the quality of work conducted for single-family, residential energy-efficiency retrofits, the Home Energy Professionals Job Task Analysis are used as the foundation for quality training programs and trainers.

  13. 48 CFR 916.504 - Indefinite-quantity contracts.

    Science.gov (United States)

    2010-10-01

    ... indefinite-quantity, multiple award contracts to ensure that adequate consideration exists to contractually... contracts. 916.504 Section 916.504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Indefinite-Delivery Contracts 916.504 Indefinite-quantity...

  14. Contracting in specialists for emergency obstetric care- does it work in rural India?

    Directory of Open Access Journals (Sweden)

    Randive Bharat

    2012-12-01

    Full Text Available Abstract Background Contracting in private sector is promoted in developing countries facing human resources shortages as a challenge to reduce maternal mortality. This study explored provision, practice, performance, barriers to execution and views about contracting in specialists for emergency obstetric care (EmOC in rural India. Methods Facility survey was conducted in all secondary and tertiary public health facilities (44 in three heterogeneous districts in Maharashtra state of India. Interviews (42 were conducted with programme managers and district and block level officials and with public and private EmOC specialists. Locations of private obstetricians in the study districts were identified and mapped. Results Two schemes, namely Janani Suraksha Yojana and Indian Public Health standards (IPHS provided for contracting in EmOC specialists. The IPHS provision was chosen for use mainly due to greater sum for contracting in (US $ 30/service episode vs.300 US$/month. The positions of EmOC specialists were vacant in 83% of all facilities that hence had a potential for contracting in EmOC specialists. Private specialists were contracted in at 20% such facilities. The contracting in of specialists did not greatly increase EmOC service outputs at facilities, except in facilities with determined leadership. Contracting in specialists was useful for non emergency conditions, but not for obstetric emergencies. The contracts were more of a relational nature with poor monitoring structures. Inadequate infrastructure, longer distance to private specialists, insufficient financial provision for contracting in, and poor management capacities were barriers to effective implementation of contracting in. Dependency on the private sector was a concern among public partners while the private partners viewed contracting in as an opportunity to gain experience and credibility. Conclusions Density and geographic distribution of private specialists are important

  15. Contracting in specialists for emergency obstetric care- does it work in rural India?

    Science.gov (United States)

    Randive, Bharat; Chaturvedi, Sarika; Mistry, Nerges

    2012-12-31

    Contracting in private sector is promoted in developing countries facing human resources shortages as a challenge to reduce maternal mortality. This study explored provision, practice, performance, barriers to execution and views about contracting in specialists for emergency obstetric care (EmOC) in rural India. Facility survey was conducted in all secondary and tertiary public health facilities (44) in three heterogeneous districts in Maharashtra state of India. Interviews (42) were conducted with programme managers and district and block level officials and with public and private EmOC specialists. Locations of private obstetricians in the study districts were identified and mapped. Two schemes, namely Janani Suraksha Yojana and Indian Public Health standards (IPHS) provided for contracting in EmOC specialists. The IPHS provision was chosen for use mainly due to greater sum for contracting in (US $ 30/service episode vs.300 US$/month). The positions of EmOC specialists were vacant in 83% of all facilities that hence had a potential for contracting in EmOC specialists. Private specialists were contracted in at 20% such facilities. The contracting in of specialists did not greatly increase EmOC service outputs at facilities, except in facilities with determined leadership. Contracting in specialists was useful for non emergency conditions, but not for obstetric emergencies. The contracts were more of a relational nature with poor monitoring structures. Inadequate infrastructure, longer distance to private specialists, insufficient financial provision for contracting in, and poor management capacities were barriers to effective implementation of contracting in. Dependency on the private sector was a concern among public partners while the private partners viewed contracting in as an opportunity to gain experience and credibility. Density and geographic distribution of private specialists are important influencing factors in determining feasibility and use of

  16. Importance of periodic revision of contracted demand in public sector organizations; Importancia da revisao periodica da demanda contratada em organizacoes do setor publico

    Energy Technology Data Exchange (ETDEWEB)

    Fortes, Marcio Zamboti; Gomes, Felipe Da Silva; Tavares, Geraldo Martins; Sodre, Waldemir Carvalho [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2010-07-01

    Nowadays, is extremely important monitoring the energy consumption in the several of different organizations. In general, this measure is done in order to control the inputs expenses used. But in some cases, such as electricity, this control becomes difficult due to lack of professional training in energy efficiency studies. Specifically, in the public sector, this lack of studies and monitoring of consumption becomes more critical, because in most cases, due to company main activity, their staffs does not covers a professional trained for this purpose. As an example, when considering the energy consumption of a general hospital, these studies and monitoring are presented as necessary actions, since the processes of expansion, relocation or reforms are constant and logically consumption of the unit vary, causing distorting when compared with the contracted energy values. This paper presents a specific study that demonstrates the importance of periodic review of the energy contract power supply by comparing an organization that has this specific professional, monitoring the consumption variation periodically with a case in which this monitoring does not exist. (author)

  17. DOE-HUD Initiative on Energy Efficiency in Housing: A federal partnership. Program summary report

    Energy Technology Data Exchange (ETDEWEB)

    Brinch, J. [Energetics, Inc., Columbia, MD (United States)

    1996-06-01

    One of the primary goals of the US Department of Housing and urban Development (HUD) is the expansion of home ownership and affordable housing opportunities. Recognizing that energy efficiency is a key component in an affordable housing strategy, HUD and the US Department of Energy (DOE) created the DOE-HUD Initiative on Energy Efficiency in Housing. The DOE-HUD Initiative was designed to share the results of DOE research with housing providers throughout the nation, to reduce energy costs in federally-subsidized dwelling units and improve their affordability and comfort. This Program Summary Report provides an overview of the DOE-HUD Initiative and detailed project descriptions of the twenty-seven projects carried out with Initiative funding.

  18. ENFORCEMENT OF MORTGAGE CONTRACT

    Directory of Open Access Journals (Sweden)

    Alisa A. BELU

    2016-07-01

    Full Text Available A chattel mortgage contract is the expression of a real guarantee that gives the creditor precedence over other creditors, in addition to the general pledge upon the belongings of the debtor. It refers to the sale of mortgaged movable assets, exclusively or prioritized in favor of the mortgaging creditor, in case the debtor does not comply with his / her commitments, under the signed mortgage contract. Beginning from this purpose, shared by both sides (as the chattel mortgage contract is synallagmatic, in case the debtor is unable to fulfill his / her commitments, the sides reach a situation of enforcement of the signed chattel mortgage contract. Given the legal status of the chattel mortgage contract [Art. 2387-2477 Noul Cod Civil , Universul Juridic, Bucureşti, 2016, ISBN 978-606-673-792-0], the principle of binding force of the contract and the principle according to which signed legal conventions will entail legal effects, the Romanian law maker developed the proper legal framework for the enforcement of the chattel mortgage contract. [art. 622 si urm. Noul Cod de Procedură Civilă, ed. Hamangiu, Bucureşti, 2016, ISBN 978-606-27-0459-9].

  19. DOE (Department of Energy) Epidemiologic Research Program

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    The objective of the Department of Energy (DOE) Epidemiologic Research Program is to determine the human health effects resulting from the generation and use of energy, and of the operation of DOE facilities. The program is divided into seven general areas of activity; the Radiation Effects Research Foundation (RERF) which supports studies of survivors of the atomic weapons in Hiroshima and Nagasaki, mortality and morbidity studies of DOE workers, studies on internally deposited alpha emitters, medical/histologic studies, studies on the aspects of radiation damage, community health surveillance studies, and the development of computational techniques and of databases to make the results as widely useful as possible. Excluding the extensive literature from the RERF, the program has produced 340 publications in scientific journals, contributing significantly to improving the understanding of the health effects of ionizing radiation exposure. In addition, a large number of public presentations were made and are documented elsewhere in published proceedings or in books. The purpose of this bibliography is to present a guide to the research results obtained by scientists supported by the program. The bibliography, which includes doctoral theses, is classified by laboratory and by year and also summarizes the results from individual authors by journal.

  20. DOE [Department of Energy] Epidemiologic Research Program

    International Nuclear Information System (INIS)

    1990-01-01

    The objective of the Department of Energy (DOE) Epidemiologic Research Program is to determine the human health effects resulting from the generation and use of energy, and of the operation of DOE facilities. The program is divided into seven general areas of activity; the Radiation Effects Research Foundation (RERF) which supports studies of survivors of the atomic weapons in Hiroshima and Nagasaki, mortality and morbidity studies of DOE workers, studies on internally deposited alpha emitters, medical/histologic studies, studies on the aspects of radiation damage, community health surveillance studies, and the development of computational techniques and of databases to make the results as widely useful as possible. Excluding the extensive literature from the RERF, the program has produced 340 publications in scientific journals, contributing significantly to improving the understanding of the health effects of ionizing radiation exposure. In addition, a large number of public presentations were made and are documented elsewhere in published proceedings or in books. The purpose of this bibliography is to present a guide to the research results obtained by scientists supported by the program. The bibliography, which includes doctoral theses, is classified by laboratory and by year and also summarizes the results from individual authors by journal

  1. 48 CFR 947.7002 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 947.7002 Section 947.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT TRANSPORTATION Foreign Travel 947.7002 Contract clause. When foreign travel may be required under the contract...

  2. The energy of naturally curved elastic rods with an application to the stretching and contraction of a free helical spring as a model for DNA

    Science.gov (United States)

    Manning, Gerald S.

    2015-09-01

    We give a contemporary and direct derivation of a classical, but insufficiently familiar, result in the theory of linear elasticity—a representation for the energy of a stressed elastic rod with central axis that intrinsically takes the shape of a general space curve. We show that the geometric torsion of the space curve, while playing a crucial role in the bending energy, is physically unrelated to the elastic twist. We prove that the twist energy vanishes in the lowest-energy states of a rod subject to constraints that do not restrict the twist. The stretching and contraction energies of a free helical spring are computed. There are local high-energy minima. We show the possibility of using the spring to model the chirality of DNA. We then compare our results with an available atomic level energy simulation that was performed on DNA unconstrained in the same sense as the free spring. We find some possible reflections of springlike behavior in the mechanics of DNA, but, unsurprisingly, the base pairs lend a material substance to the core of DNA that a spring does not capture.

  3. The energy of naturally curved elastic rods with an application to the stretching and contraction of a free helical spring as a model for DNA

    Energy Technology Data Exchange (ETDEWEB)

    Manning, Gerald S., E-mail: jerrymanning@rcn.com [Department of Chemistry and Chemical Biology, Rutgers University, 610 Taylor Road, Piscataway, New Jersey 08854-8087 (United States)

    2015-09-14

    We give a contemporary and direct derivation of a classical, but insufficiently familiar, result in the theory of linear elasticity—a representation for the energy of a stressed elastic rod with central axis that intrinsically takes the shape of a general space curve. We show that the geometric torsion of the space curve, while playing a crucial role in the bending energy, is physically unrelated to the elastic twist. We prove that the twist energy vanishes in the lowest-energy states of a rod subject to constraints that do not restrict the twist. The stretching and contraction energies of a free helical spring are computed. There are local high-energy minima. We show the possibility of using the spring to model the chirality of DNA. We then compare our results with an available atomic level energy simulation that was performed on DNA unconstrained in the same sense as the free spring. We find some possible reflections of springlike behavior in the mechanics of DNA, but, unsurprisingly, the base pairs lend a material substance to the core of DNA that a spring does not capture.

  4. 48 CFR 916.203-4 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 916.203-4 Section 916.203-4 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Fixed-Price Contracts 916.203-4 Contract clauses. (d)(2) The...

  5. EVALUATION OF ENERGY PERFORMANCE USING DOE-2 ENERGY SIMULATION PROGRAM IN SINGAPORE

    Directory of Open Access Journals (Sweden)

    Po Seng Kian

    2000-01-01

    Full Text Available Recently, due to worldwide energy cost rising significantly, there has been an essential need to minimize the energy consumption. This global warning address many countries including Singapore realizing the important of energy efficiency in industries and buildings. This paper deals with analyzing the energy consumption of an 11-storey commercial building in Singapore using DOE-2 Energy Simulation Program. A study is made on the benefits derived from modifying the building envelope, space system setting, air-conditioning plant, and lighting. This encompasses a description of its quantitative impact on cooling load, energy consumption and energy saving achieved as compared with the original building. Following this, a life cycle costing is done to determine the economic benefits attained from this modification. This study shows that some alternative solutions can be achieved using energy simulation program to conserve the energy consumption.

  6. Advancement of DOE's EnergyPlus Building Energy Simulation Payment

    Energy Technology Data Exchange (ETDEWEB)

    Gu, Lixing [Florida Solar Energy Center, Cocoa, FL (United States); Shirey, Don [Florida Solar Energy Center, Cocoa, FL (United States); Raustad, Richard [Florida Solar Energy Center, Cocoa, FL (United States); Nigusse, Bereket [Florida Solar Energy Center, Cocoa, FL (United States); Sharma, Chandan [Florida Solar Energy Center, Cocoa, FL (United States); Lawrie, Linda [DHL Consulting, Bonn (Germany); Strand, Rick [Univ. of Illinois, Champaign, IL (United States); Pedersen, Curt [COPA, Panama City (Panama); Fisher, Dan [Oklahoma State Univ., Stillwater, OK (United States); Lee, Edwin [Oklahoma State Univ., Stillwater, OK (United States); Witte, Mike [GARD Analytics, Arlington Heights, IL (United States); Glazer, Jason [GARD Analytics, Arlington Heights, IL (United States); Barnaby, Chip [Wrightsoft, Lexington, MA (United States)

    2011-09-30

    EnergyPlus{sup TM} is a new generation computer software analysis tool that has been developed, tested, and commercialized to support DOE's Building Technologies (BT) Program in terms of whole-building, component, and systems R&D (http://www.energyplus.gov). It is also being used to support evaluation and decision making of zero energy building (ZEB) energy efficiency and supply technologies during new building design and existing building retrofits. The 5-year project was managed by the National Energy Technology Laboratory and was divided into 5 budget period between 2006 and 2011. During the project period, 11 versions of EnergyPlus were released. This report summarizes work performed by an EnergyPlus development team led by the University of Central Florida's Florida Solar Energy Center (UCF/FSEC). The team members consist of DHL Consulting, C. O. Pedersen Associates, University of Illinois at Urbana-Champaign, Oklahoma State University, GARD Analytics, Inc., and WrightSoft Corporation. The project tasks involved new feature development, testing and validation, user support and training, and general EnergyPlus support. The team developed 146 new features during the 5-year period to advance the EnergyPlus capabilities. Annual contributions of new features are 7 in budget period 1, 19 in period 2, 36 in period 3, 41 in period 4, and 43 in period 5, respectively. The testing and validation task focused on running test suite and publishing report, developing new IEA test suite cases, testing and validating new source code, addressing change requests, and creating and testing installation package. The user support and training task provided support for users and interface developers, and organized and taught workshops. The general support task involved upgrading StarTeam (team sharing) software and updating existing utility software. The project met the DOE objectives and completed all tasks successfully. Although the EnergyPlus software was enhanced

  7. Copyright or Contract?

    Science.gov (United States)

    Okerson, Ann

    1997-01-01

    Most authors and publishers of electronic information believe that current copyright law does not address technical capabilities or reader uses and have turned to contracts or licenses to define the rights of owners and users. Discusses copyrights, fair use, and licenses and highlights licensing's unresolved issues: use and users; archiving;…

  8. 48 CFR 16.306 - Cost-plus-fixed-fee contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-plus-fixed-fee...-fee contracts. (a) Description. A cost-plus-fixed-fee contract is a cost-reimbursement contract that.... The fixed fee does not vary with actual cost, but may be adjusted as a result of changes in the work...

  9. Does trade liberalization effect energy consumption?

    International Nuclear Information System (INIS)

    Ghani, Gairuzazmi M.

    2012-01-01

    The effect of trade liberalization on the environment can be directly linked to energy consumption, because energy consumption and production are the underlying cause of most pollutants that harm the environment. The descriptive statistics show that average annual growth of energy consumption per capita after trade liberalization varies among countries; hence it is a possibility that the effect of trade liberalization is conditional on factors other than liberalization per se. The regression results show that trade liberalization per se does not affect the growth of energy consumption of the developing countries analyzed, but its interaction with capital per labor reduces the growth of energy consumption as capital per labor increases. However, the effect is only significant after a certain minimum threshold level capital per labor is reached. On the other hand, economic growth increases energy consumption and its effect is not conditioned on trade liberalization. These two different effects mean that, with regards to energy consumption, countries at a higher level of economic development are more likely to reap the benefit of liberalization relative to less developed countries. - Research highlights: ► This paper examines the effect of trade liberalization on energy consumption. ► Developed countries are more likely to reap the benefit of trade liberalization. ► Growth of energy consumption after trade liberalization varies among countries. ► Interaction of capital per labor with liberalization reduces energy consumption.

  10. A Business Case for Home Performance Contracting

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C.; Antonopoulos, Chrissi A.; Sevigny, Maureen; Gilbride, Theresa L.; Hefty, Marye G.

    2012-10-01

    This report was prepared by PNNL for the DOE Building America program. The report provides information for businesses considering entering the home performance contracting industry. Metrics discussed include industry trends and drivers, specific points of entry, business models, startup costs, and marketing strategies. The report includes detailed analysis of eight businesses around the country that have successfully entered the home performance contracting industry. Data is provided on their financial structures, program participation, marketing efforts, and staff training. This report will be distributed via the DOE Building America website, www.buildingamerica.gov. Individual case studies will also be cleared separately.

  11. Department of Energy – Office of Science Pacific Northwest Site Office Environmental Monitoring Plan for the DOE-SC PNNL Site

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, Sandra F.; Meier, Kirsten M.; Barnett, J. Matthew; Bisping, Lynn E.; Poston, Ted M.; Rhoads, Kathleen

    2011-12-21

    The Pacific Northwest Site Office (PNSO) manages the contract for operations at the U.S. Depart¬ment of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site in Richland, Washington. Radiological operations at the DOE-SC PNNL Site expanded in 2010 with the completion of facilities at the Physical Sciences Facility. As a result of the expanded radiological work at the site, the Washington State Department of Health (WDOH) has required that offsite environmental surveillance be conducted as part of the PNNL Site Radioactive Air Emissions License. The environ¬mental monitoring and surveillance requirements of various orders, regulations, and guidance documents consider emission levels and subsequent risk of negative human and environmental impacts. This Environmental Monitoring Plan (EMP) describes air surveillance activities at the DOE-SC PNNL Site. The determination of offsite environmental surveillance needs evolved out of a Data Quality Objectives process (Barnett et al. 2010) and Implementation Plan (Snyder et al. 2010). The entire EMP is a compilation of several documents, which include the Main Document (this text), Attachment 1: Sampling and Analysis Plan, Attachment 2: Data Management Plan, and Attachment 3: Dose Assessment Guidance.

  12. Office of River Protection (DOE-ORP) Hanford Tank Waste Treatment Alternatives March 2000

    International Nuclear Information System (INIS)

    WODRICH, D.D.

    2000-01-01

    The U.S. Department of Energy (DOE) is currently planning to retrieve, pretreat, immobilize and safely dispose of 53 million gallons of highly radioactive waste currently stored in underground tanks at Hanford Site. The DOE plan is a two-phased approach to privatizing the processing of hazardous and radioactive waste. Phase 1 is a proof-of-concept/commercial demonstration-scale effort whose objectives are to: demonstrate, the technical and business viability of using privatized facilities to treat Hanford tank waste; define and maintain required levels of radiological, nuclear, process and occupational safety; maintain environmental protection and compliance; and substantially reduce life-cycle costs and time required to treat Hanford tank waste. The Phase 1 effort consists of Part A and Part B. On September 25, 1996 (Reference 1), DOE signed a contract with BNFL, Inc. (BNFL) to commence with Phase 1, Part A. In August 1998, BNFL was authorized to proceed with Phase I, Part 6-1, a 24-month design phase that will-provide sufficient engineering and financial maturity to establish fixed-unit prices and financing terms for tank waste processing services in privately-owned and -operated facilities. By August 2000, DOE will decide whether to authorize BNFL to proceed with construction and operation of the proposed processing facilities, or pursue a different path. To support of the decision, DOE is evaluating alternatives to potentially enhance the BNFL tank waste processing contract, as well as, developing an alternate path forward should DOE decide to not continue the BNFL contract. The decision on whether to continue with the current privatization strategy (BNFL contract) or to pursue an alternate can not be made until the evaluation process leading up to the decision on whether to authorize BNFL to proceed with construction and operation (known as the Part 8-2 decision) is completed. The evaluation process includes reviewing and evaluating the information BNFL is

  13. Determination of the absolute jet energy scale in the DOe calorimeters

    International Nuclear Information System (INIS)

    Abbott, B.; Abolins, M.; Acharya, B.S.; Adam, I.; Adams, D.L.; Adams, M.; Ahn, S.; Aihara, H.; Alves, G.A.; Amos, N.; Anderson, E.W.; Astur, R.; Baarmand, M.M.; Babukhadia, L.; Baden, A.; Balamurali, V.; Balderston, J.; Baldin, B.; Banerjee, S.; Bantly, J.; Barberis, E.; Bartlett, J.F.; Belyaev, A.; Beri, S.B.; Bertram, I.; Bezzubov, V.A.; Bhat, P.C.; Bhatnagar, V.; Bhattacharjee, M.; Biswas, N.; Blazey, G.; Blessing, S.; Bloom, P.; Boehnlein, A.; Bojko, N.I.; Borcherding, F.; Boswell, C.; Brandt, A.; Brock, R.; Bross, A.; Buchholz, D.; Burtovoi, V.S.; Butler, J.M.; Carvalho, W.; Casey, D.; Casilum, Z.; Castilla-Valdez, H.; Chakraborty, D.; Chang, S.-M.; Chekulaev, S.V.; Chen, L.-P.; Chen, W.; Choi, S.; Chopra, S.; Choudhary, B.C.; Christenson, J.H.; Chung, M.; Claes, D.; Clark, A.R.; Cobau, W.G.; Cochran, J.; Coney, L.; Cooper, W.E.; Cretsinger, C.; Cullen-Vidal, D.; Cummings, M.A.C.; Cutts, D.; Dahl, O.I.; Davis, K.; De, K.; Signore, K. Del; Demarteau, M.; Denisov, D.; Denisov, S.P.; Diehl, H.T.; Diesburg, M.; Loreto, G. Di; Draper, P.; Ducros, Y.; Dudko, L.V.; Dugad, S.R.; Edmunds, D.; Ellison, J.; Elvira, V.D.; Engelmann, R.; Eno, S.; Eppley, G.; Ermolov, P.; Eroshin, O.V.; Evdokimov, V.N.; Fahland, T.; Fatyga, M.K.; Feher, S.; Fein, D.; Ferbel, T.; Finocchiaro, G.; Fisk, H.E.; Fisyak, Y.; Flattum, E.; Forden, G.E.; Fortner, M.; Frame, K.C.; Fuess, S.; Gallas, E.; Galyaev, A.N.; Gartung, P.; Gavrilov, V.; Geld, T.L.; II, R.J. Genik; Genser, K.; Gerber, C.E.; Gershtein, Y.; Gibbard, B.; Glenn, S.; Gobbi, B.; Goldschmidt, A.; Gomez, B.; Gomez, G.; Goncharov, P.I.; GonzalezSolis, J.L.; Gordon, H.; Goss, L.T.; Gounder, K.; Goussiou, A.; Graf, N.; Grannis, P.D.; Green, D.R.; Greenlee, H.; Grinstein, S.; Grudberg, P.; Gruenendahl, S.; Guglielmo, G.; Guida, J.A.; Guida, J.M.; Gupta, A.; Gurzhiev, S.N.; Gutierrez, G.; Gutierrez, P.; Hadley, N.J.; Haggerty, H.; Hagopian, S.; Hagopian, V.; Hahn, K.S.; Hall, R.E.; Hanlet, P.; Hansen, S.; Hauptman, J.M.; Hedin, D.; Heinson, A.P.; Heintz, U.; Hernandez-Montoya, R.; Heuring, T.; Hirosky, R.; Hobbs, J.D.; Hoeneisen, B.; Hoftun, J.S.; Hsieh, F.; Hu, Ting; Hu, Tong; Huehn, T.; Ito, A.S.; James, E.; Jaques, J.; Jerger, S.A.; Jesik, R.; Jiang, J.Z.-Y.; Joffe-Minor, T.; Johns, K.; Johnson, M.; Jonckheere, A.; Jones, M.; Joestlein, H.; Jun, S.Y.; Jung, C.K.; Kahn, S.; Kalbfleisch, G.; Kang, J.S.; Karmanov, D.; Karmgard, D.; Kehoe, R.; Kelly, M.L.; Kim, C.L.; Kim, S.K.; Klima, B.; Klopfenstein, C.; Kohli, J.M.; Koltick, D.; Kostritskiy, A.V.; Kotcher, J.; Kotwal, A.V.; Kourlas, J.; Kozelov, A.V.; Kozlovsky, E.A.; Krane, J.; Krishnaswamy, M.R.; Krzywdzinski, S.; Kuleshov, S.; Kunori, S.; Landry, F.; Landsberg, G.; Lauer, B.; Leflat, A.; Li, H.; Li, J.; Li-Demarteau, Q.Z.; Lima, J.G.R.; Lincoln, D.; Linn, S.L.; Linnemann, J.; Lipton, R.; Liu, Y.C.; Lobkowicz, F.; Loken, S.C.; Loekoes, S.; Lueking, L.; Lyon, A.L.; Maciel, A.K.A.; Madaras, R.J.; Madden, R.; Magan#=tilde#a-Mendoza, L.; Manankov, V.; Mani, S.; Mao, H.S.; Markeloff, R.; Marshall, T.; Martin, M.I.; Mauritz, K.M.; May, B.; Mayorov, A.A.; McCarthy, R.; McDonald, J.; McKibben, T.; McKinley, J.; McMahon, T.; Melanson, H.L.; Merkin, M.; Merritt, K.W.; Miettinen, H.; Mincer, A.; Mishra, C.S.; Mokhov, N.; Mondal, N.K.; Montgomery, H.E.; Mooney, P.; da Motta, H.; Murphy, C.; Nang, F.; Narain, M.; Narasimham, V.S.; Narayanan, A.; Neal, H.A.; Negret, J.P.; Nemethy, P.; Norman, D.; Oesch, L.; Oguri, V.; Oliveira, E.; Oltman, E.; Oshima, N.; Owen, D.; Padley, P.; Para, A.; Park, Y.M.; Partridge, R.; Parua, N.; Paterno, M.; Pawlik, B.; Perkins, J.; Peters, M.; Piegaia, R.; Piekarz, H.; Pischalnikov, Y.; Pope, B.G.; Prosper, H.B.; Protopopescu, S.; Qian, J.; Quintas, P.Z.; Raja, R.; Rajagopalan, S.; Ramirez, O.; Rasmussen, L.; Reucroft, S.; Rijssenbeek, M.; Rockwell, T.; Roco, M.; Rubinov, P.; Ruchti, R.; Rutherfoord, J.; Sanchez-Hernandez, A.; Santoro, A.; Sawyer, L.; Schamberger, R.D.; Schellman, H.; Sculli, J.; Shabalina, E.; Shaffer, C.; Shankar, H.C.; Shivpuri, R.K.; Shupe, M.; Singh, H.; Singh, J.B.; Siroten ko, V.; Smart, W.; Smith, E.; Smith, R.P.; Snihur, R.; Snow, G.R.; Snow, J.; Snyder, S.; Solomon, J.; Sosebee, M.; Sotnikova, N.; Souza, M.; Spadafora, A.L.; Steinbrueck, G.; Stephens, R.W.; Stevenson, M.L.; Stewart, D.; Stichelbaut, F.; Stoker, D.; Stolin, V.; Stoyanova, D.A.; Strauss, M.; Streets, K.; Strovink, M.; Sznajder, A.; Tamburello, P.; Tarazi, J.; Tartaglia, M.; Thomas, T.L.T.; Thompson, J.; Trippe, T.G.; Tuts, P.M.; Varelas, N.; Varnes, E.W.; Vititoe, D.; Volkov, A.A.; Vorobiev, A.P.; Wahl, H.D.; Wang, G.; Warchol, J.; Watts, G.; Wayne, M.; Weerts, H.; White, A.; White, J.T.; Wightman, J.A.; Willis, S.; Wimpenny, S.J.; Wirjawan, J.V.D.; Womersley, J.; Won, E.; Wood, D.R.; Xu, H.; Yamada, R.; Yamin, P.; Yang, J.; Yasuda, T.; Yepes, P.; Yoshikawa, C.; Youssef, S.; Yu, J.; Yu, Y.; Zhou, Z.; Zhu, Z.H.; Zieminska, D.; Zieminski, A.; Zverev, E.G.; Zylberstejn, A.

    1999-01-01

    The DOe detector is used to study pp-bar collisions at the 1800 and 630 GeV center-of-mass energies available at the Fermilab Tevatron. To measure jets, the detector uses a sampling calorimeter composed of uranium and liquid argon as the passive and active media, respectively. Understanding the jet energy calibration is not only crucial for precision tests of QCD, but also for the measurement of particle masses and the determination of physics backgrounds associated with new phenomena. This paper describes the energy calibration of jets observed with the DOe detector at the two pp-bar center-of-mass energies in the transverse energy and pseudorapidity range E T >8 GeV and vertical bar η vertical bar <3

  14. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE`s deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program.

  15. Debt renegotiation with incomplete contract

    Directory of Open Access Journals (Sweden)

    Paulo de Melo Jorge Neto

    2005-09-01

    Full Text Available A debt contract usually does not include a provision about renegotiation. The right to seize the borrower’s asset and the rules of this process are usually stipulated in the contract. Such a promise not to renegotiate is not credible since renegotiation can mitigate the dead-weight loss of liquidating insolvent borrowers. Once the initial contract may not consider the renegotiation procedure and renegotiation may occur, this paper investigates why a complete contract is not offered. It shows that the lender does not need to stipulate the renegotiation procedure on the initial contract because he is indifferent about committing or not to the terms of a contract. This indicates that a complete contract gives the lender the same expected return as an incomplete contract, in which the renegotiation process is determined after the occurrence of default.Um contrato de débito geralmente não inclui uma cláusula sobre renegociação. O direito de liquidar os ativos do tomador e as regras do processo são habitualmente estipuladas no contrato. Tal promessa de não renegociar não é crível, já que a renegociação pode mitigar a perda bruta de se liquidar tomadores insolventes. Uma vez que o contrato inicial pode não considerar os procedimentos de renegociação, e esta pode, de fato, vir a ocorrer, este artigo investiga a razão de um contrato completo não ser ofertado. Mostra-se que o emprestador não precisa estipular os procedimentos de renegociação no contrato inicial porque ele é indiferente entre se comprometer ou não aos termos do contrato. Isto indica que um contrato completo dá ao emprestador o mesmo retorno esperado de um contrato incompleto, no qual os procedimentos de renegociação são determinados após a declaração de default.

  16. Is Contract Law Necessary?

    OpenAIRE

    SCHWARTZ, Alan

    2010-01-01

    This lecture was delivered on 17 March 2010. Alan Schwartz, Sterling Professor of Law; Professor of Management, Yale University This Lecture argues that much of the contract law in the cases (the US, the UK and Canada) and in the codes (Europe and Latin America) is unnecessary. To say that a law is unnecessary is to say that it does not perform a useful social function. The argument below thus sets out the functions that contract laws today are thought to serve, and then shows that many of...

  17. Book-Smart, Not Street-Smart: Blockchain-Based Smart Contracts and The Social Workings of Law

    OpenAIRE

    Karen E. C. Levy

    2017-01-01

    This paper critiques blockchain-based “smart contracts,” which aim to automatically and securely execute obligations without reliance on a centralized enforcement authority. Though smart contracts do have some features that might serve the goals of social justice and fairness, I suggest that they are based on a thin conception of what law does, and how it does it. Smart contracts focus on the technical form of contract to the exclusion of the social contexts within which contracts operate, an...

  18. 78 FR 23550 - Department of Energy's (DOE) Participation in Development of the International Energy...

    Science.gov (United States)

    2013-04-19

    ... building energy codes by periodically reviewing the technical and economic basis of the voluntary building... and modification of such codes. (42 U.S.C. 6836(b)) B. Background The IECC serves as a model building... building energy codes is through participation in the IECC development process. DOE participates in the ICC...

  19. 48 CFR 942.270-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 942.270-2 Section 942.270-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 942.270-2 Contract clause. The clause at 952...

  20. [Studies of high energy phenomena using muons

    International Nuclear Information System (INIS)

    Albanese, R.C.

    1990-01-01

    This report covers the activities of the NIU high energy physics group as supported by DOE contract AC02-87ER40368 during the period from March--December of 1990. Our group has two primary efforts. The first is the D0 experiment at the Fermilab proton-antiproton collider, with major emphasis on its muon system. The second is the involvement of a portion of the group in Fermilab Experiments 772 and 789. Finally, we are also participating in the design of detectors for the SSC. A more detailed description of the work of the NIU high energy physics group may be found in the narrative accompanying our contract renewal proposal

  1. Reported Energy and Cost Savings from the DOE ESPC Program: FY 2014

    Energy Technology Data Exchange (ETDEWEB)

    Slattery, Bob S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-03-01

    The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 156 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project. For all 156 projects, there was sufficient information to compare estimated, reported, and guaranteed cost savings. For this group, the total estimated cost savings for the reporting periods addressed were $210.6 million, total reported cost savings were $215.1 million, and total guaranteed cost savings were $204.5 million. This means that on average: ESPC contractors guaranteed 97% of the estimated cost savings; projects reported achieving 102% of the estimated cost savings; and projects reported achieving 105% of the guaranteed cost savings. For 155 of the projects examined, there was sufficient information to compare estimated and reported energy savings. On the basis of site energy, estimated savings for those projects for the previous year totaled 11.938 million MMBtu, and reported savings were 12.138 million MMBtu, 101.7% of the estimated energy savings. On the basis of source energy, total estimated energy savings for the 155 projects were 19.052 million MMBtu, and reported saving were 19.516 million MMBtu, 102.4% of the estimated energy savings.

  2. Energy research at DOE, was it worth it?: energy efficiency and fossil energy research 1978 to 2000

    National Research Council Canada - National Science Library

    2001-01-01

    In legislation appropriating funds for DOE's fiscal year (FY) 2000 energy R&D budget, the House Interior Appropriations Subcommittee directed an evaluation of the benefits that have accrued to the nation...

  3. Richland Operations Office (DOE-RL) Implementation Plan for DOE Order 435.1

    International Nuclear Information System (INIS)

    FRITZ, D.W.

    2000-01-01

    The U.S. Department of Energy issued U.S. Department of Energy Order 435.1, Radioactive Waste Management, and U.S. Department of Energy Manual 435.1-1, Radioactive Waste Management Manual, on July 9, 1999, to replace U.S. Department of Energy Order 5820.2A. Compliance is required by July 9, 2000, where compliance is defined as ''implementing the requirements, or an approved implementation, or corrective action plan'' (refer to Manual, Introduction, paragraph four). This implementation plan identifies the status of each requirement for U.S. Department of Energy, Richland Operations Office Site contractors, and provides the plan, cost, and length of time required for achieving full implementation. The U.S. Department of Energy, Richland Operations Office contractors (Fluor Hanford, Incorporated, DynCorp Tri-Cities Services, Bechtel Hanford, Inc., and Pacific Northwest National Laboratory) conducted a line-by-line review of DOE Order 435.1 and associated manuals to determine which requirements were new, and which requirements already are used for compliance with the previous DOE Order 5820.2A or other requirements. The Gap Analysis for DOE Order 435.1 (HNF-5465) identified compliance gaps, along with other issues that would impact efforts for achieving compliance. The gap analysis also contained a series of assumptions made by the various projects in determining compliance status. The details and section-by-section analysis are contained in Appendix A. Some of the DOE Order 435.1 requirements invoke sections of other DOE Orders not incorporated in various U.S. Department of Energy, Richland Operations Office contracts (refer to Section 2.0, Table 2-1). Those additional DOE Orders are identified by contractor and will be left for evaluation in accordance with each contractor's requirements. No attempt was made to evaluate all of those orders at this time, although in many cases, contractors follow a similar older DOE Order, which is cited in the Appendix. In some areas

  4. DOE-RL Integrated Safety Management System Description

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    2000-01-01

    The purpose of this Integrated Safety Management System Description (ISMSD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This ISMSD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this ISMSD contains some information on contractor processes and procedures which then require RL approval or oversight. This ISMSD does not purport to contain a full description of the contractors' ISM System Descriptions

  5. DOE-RL Integrated Safety Management System Description

    CERN Document Server

    Shoop, D S

    2000-01-01

    The purpose of this Integrated Safety Management System Description (ISMSD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This ISMSD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this ISMSD contains some information on contractor processes and procedures which then require RL approval or oversight. This ISMSD does not purport to contain a full description of the contractors' ISM System Descriptions.

  6. 48 CFR 916.405 - Cost-reimbursement incentive contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Cost-reimbursement incentive contracts. 916.405 Section 916.405 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 916.405 Cost-reimbursement...

  7. DOE Plutonium Disposition Study: Pu consumption in ALWRs

    International Nuclear Information System (INIS)

    1993-01-01

    The Department of Energy (DOE) has contracted with Asea Brown Boveri-Combustion Engineering (ABB-CE) to provide information on the capability of ABB-CE's System 80 + Advanced Light Water Reactor (ALWR) to transform, through reactor burnup, 100 metric tonnes (MT) of weapons grade plutonium (Pu) into a form which is not readily useable in weapons. This information is being developed as part of DOE's Plutonium Disposition Study, initiated by DOE in response to Congressional action. This document, Volume 1, presents a technical description of the various elements of the System 80 + Standard Plant Design upon which the Plutonium Disposition Study was based. The System 80 + Standard Design is fully developed and directly suited to meeting the mission objectives for plutonium disposal. The bass U0 2 plant design is discussed here

  8. Guide to energy R and D programs for universities and other research groups

    International Nuclear Information System (INIS)

    1984-06-01

    The purpose of this guide to provide researchers in universities and other research institutions with summary-level information on the various research and development programs supported by the Department. Collectively, DOE programs support a wide range of research activities - from studies on the fundamental nature of matter and energy to exploratory and advanced research on the development of new technical approaches leading to new energy technologies. The guide summarizes, in one source, basic information on DOE's energy research and development and related programs, interests and needs. It supplies information on current Federal and DOE grant and contract policies and procedures and lists the names of DOE staff, by program area, from whom additional information may be obtained

  9. 48 CFR 970.5223-5 - DOE motor vehicle fleet fuel efficiency.

    Science.gov (United States)

    2010-10-01

    ... and Contract Clauses for Management and Operating Contracts 970.5223-5 DOE motor vehicle fleet fuel..., insert the following clause in contracts providing for Contractor management of the motor vehicle fleet... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false DOE motor vehicle fleet...

  10. The project for an energy-enriched curriculum: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    The Project for an Energy-Enriched Curriculum (PEEC) reported was a long-running effort at infusing energy/environment/economics (E/E/E) themes into the K-12 curriculum. While it was conducted as a single integrated effort by the National Science Teachers Association (NSTA), it is supported by a series of contracts and grants, during the period 1976 to 1984, from the Energy Research and Development Administration (ERDA) and the US Department of Energy (DOE).

  11. 10 CFR 603.200 - Contracting officer responsibilities.

    Science.gov (United States)

    2010-01-01

    ....200 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Appropriate Use of Technology Investment Agreements § 603.200 Contracting officer responsibilities... contracting officer's judgment that the use of a TIA could benefit the RD&D objectives in ways that likely...

  12. Double Dutch : On the role of the transparency requirement with regard to the language in which standard contract terms for B2C-contracts must be drafted

    NARCIS (Netherlands)

    Loos, M.

    2017-01-01

    European legislation currently does not clearly determine in what language standard contract terms must be drafted in order to be validly incorporated into consumer contracts so they can be relied upon by a trader. This may be particularly problematic in the case of a cross-border contract as

  13. Food and drink serving contract

    Directory of Open Access Journals (Sweden)

    Veselinović Janko

    2012-01-01

    Full Text Available Food and drink catering service is almost as old as the civilization itself. Even though this vocation is a part of the catering activity, Serbian law does not foresee this contract section as personalized. Key legal sources for this kind of contract are business customs. Food and drink serving contract is a mixed-type contract and its legal nature is very interesting due to its complexity. Specific for this contract is the fact that it is not an ordinary service, but also an activity which requires a degree of culinary skills, knowledge of customs of other nations, as well as other skills. The very category of a good professional in business economy / hospitality industry is very dynamic, as it needs to be evaluated according to all given circumstances, which may be rather unpredictable. By considering the legal nature, but also the rights and obligations of the contracting parties, we tried to point to the questions that require a special attention. Legal sources that indirectly refer to food and drink serving contracts were taken into account. Apart from the Law on Obligatory Relations, we also considered here the Law on Tourism also pointing to the comparative law and jurisprudence.

  14. [Studies of high energy phenomena using muons

    International Nuclear Information System (INIS)

    1990-01-01

    This report covers the activities of the NIU high energy physics group as supported by DOE contract AC02-87ER40368 during the period from March through December of 1990. Our group has two primary efforts. The first is the D0 experiment at the Fermilab proton-antiproton collider, with major emphasis on its muon system. The second is the involvement of a portion of the group in Fermilab Experiments 772 and 789. Finally, we are also participating in the design of detectors for the SSC. A more detailed description of the work of the NIU high energy physics group may be found in the narrative accompanying our contract renewal proposal

  15. High energy hadron-hadron collisions. Annual progress report

    International Nuclear Information System (INIS)

    Chou, T.T.

    1979-03-01

    Work on high energy hadron-hadron collisions in the geometrical model, performed under the DOE Contract No. EY-76-S-09-0946, is summarized. Specific items studied include the behavior of elastic hadron scatterings at super high energies and the existence of many dips, the computation of meson radii in the geometrical model, and the hadronic matter current effects in inelastic two-body collisions

  16. Nuclear energy: Environmental issues at DOE's nuclear defense facilities

    International Nuclear Information System (INIS)

    1986-01-01

    GAO's review of nine Department of Energy defense facilities identified a number of significant environmental issues: (1) eight facilities have groundwater contaminated with radioactive and/or hazardous substances to high levels; (2) six facilities have soil contamination in unexpected areas, including offsite locations; (3) four facilities are not in full compliance with the Clean Water Act; and (4) all nine facilities are significantly changing their waste disposal practices to obtain a permit under the Resource Conservation and Recovery Act. GAO is recommending that DOE develop and overall groundwater and soil protection strategy that would provide a better perspective on the environmental risks and impacts associated with operating DOE's nuclear defense facilities. GAO also recommends that DOE allow outside independent inspections of the disposal practices used for any waste DOE self-regulates and revise its order governing the management of hazardous and mixed waste

  17. Electromyography Exposes Heterogeneity in Muscle Co-Contraction following Stroke

    Directory of Open Access Journals (Sweden)

    Caitlin L. Banks

    2017-12-01

    Full Text Available Walking after stroke is often described as requiring excessive muscle co-contraction, yet, evidence that co-contraction is a ubiquitous motor control strategy for this population remains inconclusive. Co-contraction, the simultaneous activation of agonist and antagonist muscles, can be assessed with electromyography (EMG but is often described qualitatively. Here, our goal is to determine if co-contraction is associated with gait impairments following stroke. Fifteen individuals with chronic stroke and nine healthy controls walked on an instrumented treadmill at self-selected speed. Surface EMGs were collected from the medial gastrocnemius (MG, soleus (SOL, and tibialis anterior (TA of each leg. EMG envelope amplitudes were assessed in three ways: (1 no normalization, (2 normalization to the maximum value across the gait cycle, or (3 normalization to maximal M-wave. Three co-contraction indices were calculated across each agonist/antagonist muscle pair (MG/TA and SOL/TA to assess the effect of using various metrics to quantify co-contraction. Two factor ANOVAs were used to compare effects of group and normalization for each metric. Co-contraction during the terminal stance (TSt phase of gait is not different between healthy controls and the paretic leg of individuals post-stroke, regardless of the metric used to quantify co-contraction. Interestingly, co-contraction was similar between M-max and non-normalized EMG; however, normalization does not impact the ability to resolve group differences. While a modest correlation is revealed between the amount of TSt co-contraction and walking speed, the relationship is not sufficiently strong to motivate further exploration of a causal link between co-contraction and walking function after stroke. Co-contraction does not appear to be a common strategy employed by individuals after stroke. We recommend exploration of alternative EMG analysis approaches in an effort to learn more about the causal

  18. JURIDICAL WILL IN CONTRACTS

    Directory of Open Access Journals (Sweden)

    Emilian CIONGARU

    2015-07-01

    Full Text Available In the business law, almost all judicial relationships of private law are obligational juridical relationships which are made up of legal acts and facts. The most important legal act is the contract since it is the basis of the social life in any community meaning that it represents the most important economic and juridical instrument for the participants to a contract. The persons are free and equal in society and, consequently, no power is valid and fundamental unless it relies on their consent, namely on a contract. So, the existence of a civil contract relies on the principles of consensualism, a perception based on moral rules to observe one’s promises, to have good faith and to observe the interests of your fellow creature. The exterior manifestation, the expression or declaration of the juridical will constitutes the consent of such person in making the structure of contract. The declared will must correspond to the person’s real will and the adoption and declaration of the juridical will must take place consciously. Any contract that does not derive from juridical will is null and the civilizing character is inexistent. The principles giving sense to consensualism is the one of agreement between parties so as to produce legal effects by itself and it is enough for the conclusion of a contract, regardless of the form in which it is exteriorized, a principle expressed by the Latin adagio pacta sunt servanda.

  19. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    International Nuclear Information System (INIS)

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE's deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program

  20. DOE Fire Protection Handbook, Volume I

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    The Department of Energy (DOE) Fire Protection Program is delineated in a number of source documents including; the Code of Federal Regulations (CFR), DOE Policy Statements and Orders, DOE and national consensus standards (such as those promulgated by the National Fire Protection Association), and supplementary guidance, This Handbook is intended to bring together in one location as much of this material as possible to facilitate understanding and ease of use. The applicability of any of these directives to individual Maintenance and Operating Contractors or to given facilities and operations is governed by existing contracts. Questions regarding applicability should be directed to the DOE Authority Having Jurisdiction for fire safety. The information provided within includes copies of those DOE directives that are directly applicable to the implementation of a comprehensive fire protection program. They are delineated in the Table of Contents. The items marked with an asterisk (*) are included on the disks in WordPerfect 5.1 format, with the filename noted below. The items marked with double asterisks are provided as hard copies as well as on the disk. For those using MAC disks, the files are in Wordperfect 2.1 for MAC.

  1. Comparison of fully internally and strongly contracted multireference configuration interaction procedures

    Science.gov (United States)

    Sivalingam, Kantharuban; Krupicka, Martin; Auer, Alexander A.; Neese, Frank

    2016-08-01

    Multireference (MR) methods occupy an important class of approaches in quantum chemistry. In many instances, for example, in studying complex magnetic properties of transition metal complexes, they are actually the only physically satisfactory choice. In traditional MR approaches, single and double excitations are performed with respect to all reference configurations (or configuration state functions, CSFs), which leads to an explosive increase of computational cost for larger reference spaces. This can be avoided by the internal contraction scheme proposed by Meyer and Siegbahn, which effectively reduces the number of wavefunction parameters to their single-reference counterpart. The "fully internally contracted" scheme (FIC) is well known from the popular CASPT2 approach. An even shorter expansion of the wavefunction is possible with the "strong contraction" (SC) scheme proposed by Angeli and Malrieu in their NEVPT2 approach. Promising multireference configuration interaction formulations (MRCI) employing internal contraction and strong contraction have been reported by several authors. In this work, we report on the implementation of the FIC-MRCI and SC-MRCI methodologies, using a computer assisted implementation strategy. The methods are benchmarked against the traditional uncontracted MRCI approach for ground and excited states of small molecules (N2, O2, CO, CO+, OH, CH, and CN). For ground states, the comparison includes the "partially internally contracted" MRCI based on the Celani-Werner ansatz (PC-MRCI). For the three contraction schemes, the average errors range from 2% to 6% of the uncontracted MRCI correlation energies. Excitation energies are reproduced with ˜0.2 eV accuracy. In most cases, the agreement is better than 0.2 eV, even in cases with very large differential correlation contributions as exemplified for the d-d and ligand-to-metal charge transfer transitions of a Cu [NH 3 ] 4 2 + model complex. The benchmark is supplemented with the

  2. Panel discussion : contract design

    International Nuclear Information System (INIS)

    Vallas, A.; Vegh, G.; McGee, M.; Zaremba, T.; Seshan, A.; Harricks, P.; Bertoldi, L.; Taylor, R.

    2003-01-01

    This session presented highlights of the comments of 8 panelists who discussed the issue of contract design. The new electricity market in Ontario has introduced the energy trader, who enters into a contract with the consumer, based on the spot price set by the Independent Electricity Market Operator. Every contract has a fixed price payer as well as floating-price payers. If the floating price for a given amount of energy is higher than the fixed price, then the consumer gets the difference. Confusion, however, arises with the purchase of retail physical power in the market, particularly in deciding a fixed rate that the consumer will be paying. Different billing options were also discussed with emphasis on mid to large retail customers that have portfolios in the tens of MW and up to 100 MW or more. figs

  3. Panel discussion : contract design

    Energy Technology Data Exchange (ETDEWEB)

    Vallas, A. [Sempra Energy Trading, Toronto, ON (Canada); Vegh, G. [MacLeod Dixon, Toronto, ON (Canada); McGee, M. [Energy Profiles Ltd., Etobicoke, ON (Canada); Zaremba, T. [Direct Energy Marketing, Calgary, AB (Canada); Seshan, A. [Larson and Toubro Information Technology, Toronto, ON (Canada); Harricks, P. [Gowlings, Toronto, ON (Canada); Bertoldi, L. [Borden Ladner Gervais, Toronto, ON (Canada); Taylor, R. [Hydro One Networks Inc., Markham, ON (Canada)

    2003-05-01

    This session presented highlights of the comments of 8 panelists who discussed the issue of contract design. The new electricity market in Ontario has introduced the energy trader, who enters into a contract with the consumer, based on the spot price set by the Independent Electricity Market Operator. Every contract has a fixed price payer as well as floating-price payers. If the floating price for a given amount of energy is higher than the fixed price, then the consumer gets the difference. Confusion, however, arises with the purchase of retail physical power in the market, particularly in deciding a fixed rate that the consumer will be paying. Different billing options were also discussed with emphasis on mid to large retail customers that have portfolios in the tens of MW and up to 100 MW or more. figs.

  4. DOE enforcement program roles and responsibilities: DOE handbook

    International Nuclear Information System (INIS)

    1995-08-01

    The Price-Anderson Act provides indemnification to DOE contractors who manage and conduct nuclear activities in the DOE complex. The government acts as an insurer for these contractors against any findings of liability from the nuclear activities of the contractor within the scope of its contract. 10 CFR Part 820 establishes the legal framework for implementing DOE's Nuclear Safety Enforcement Program. Integration with other DOE organizations and programs would assure that the enforcement process properly considers the actual or potential safety significance of a violation when determining an appropriate enforcement sanction. Achieving a proactive contractor compliance assurance rather than a heavy enforcement hand, will require a foundation of cooperation and teamwork across DOE organizations. This handbook identifies the areas of interface for the DOE Enforcement Program and provides guidance on roles and responsibilities for the key DOE organizational areas. It complements DOE-HDBK-1087-95 and 1089-95

  5. List of DOE radioisotope customers with summary of radioisotope shipments, FY 1981

    International Nuclear Information System (INIS)

    Burlison, J.S.

    1982-09-01

    The seventeenth edition of the radioisotope customer list was prepared at the request of the Office of Health and Environmental Research, Office of Energy Research, Department of Energy (DOE). This document lists DOE's radioisotope production and distribution activities by its facilities at Argonne National Laboratory: Pacific Northwest Laboratory; Brookhaven National Laboratory; Hanford Engineering Development Laboratory; Idaho Operations Office; Los Alamos Scientific Laboratory; Mound Facility; Oak Ridge National Laboratory; Savannah River Laboratory; and UNC Nuclear Industries, Inc. The information is divided into five sections: (1) isotope suppliers, facility, contracts and isotopes or services supplied; (2) alphabetical list of customers, and isotopes purchased; (3) alphabetical list of isotopes cross-referenced to customer numbers; (4) geographical location of radioisotope customers; and (5) radioisotope sales and transfers-FY 1980

  6. List of DOE radioisotope customers with summary of radioisotope shipments, FY 1980

    International Nuclear Information System (INIS)

    Burlison, J.S.

    1981-08-01

    The sixteenth edition of the radioisotope customer list was prepared at the request of the Office of Health and Environmental Research, Office of energy Research, Department of Energy (DOE). This document lists DOE's radioisotope production and distribution activities by its facilities at Argonne National Laboratory; Pacific Northwest Laboratory; Brookhaven National Laboraory; Hanford Engineering Development Laboratory; Idaho Operations Office; Los Alamos Scientific Laboratory; Mound Facility; Oak Ridge National Laboratory; Savannah River Laboratory; and UNC Nuclear Industries, Inc. The information is divided into five sections: (1) isotope suppliers, facility, contracts and isotopes or services supplied; (2) alphabetical list of customers, and isotopes purchased; (3) alphabetical list of isotopes cross-referenced to customer numbers; (4) geographical location of radioisotope customers; and (5) radioisotope sales and transfers-FY 1980

  7. DOE Solar Energy Technologies Program FY 2005 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Sutula, Raymond A. [DOE Solar Energy Technologies Program, Washington, D.C. (United States)

    2006-03-01

    The DOE Solar Energy Technologies Program FY 2005 Annual Report chronicles the R&D results of the program for fiscal year 2005. In particular, the report describes R&D performed by the Program’s national laboratories and university and industry partners.

  8. Nuclear Energy Gradients for Internally Contracted Complete Active Space Second-Order Perturbation Theory: Multistate Extensions.

    Science.gov (United States)

    Vlaisavljevich, Bess; Shiozaki, Toru

    2016-08-09

    We report the development of the theory and computer program for analytical nuclear energy gradients for (extended) multistate complete active space perturbation theory (CASPT2) with full internal contraction. The vertical shifts are also considered in this work. This is an extension of the fully internally contracted CASPT2 nuclear gradient program recently developed for a state-specific variant by us [MacLeod and Shiozaki, J. Chem. Phys. 2015, 142, 051103]; in this extension, the so-called λ equation is solved to account for the variation of the multistate CASPT2 energies with respect to the change in the amplitudes obtained in the preceding state-specific CASPT2 calculations, and the Z vector equations are modified accordingly. The program is parallelized using the MPI3 remote memory access protocol that allows us to perform efficient one-sided communication. The optimized geometries of the ground and excited states of a copper corrole and benzophenone are presented as numerical examples. The code is publicly available under the GNU General Public License.

  9. Energy conservation attenuates the loss of skeletal muscle excitability during intense contractions

    DEFF Research Database (Denmark)

    Macdonald, W A; Ørtenblad, N; Nielsen, Ole Bækgaard

    2007-01-01

    High-frequency stimulation of skeletal muscle has long been associated with ionic perturbations, resulting in the loss of membrane excitability, which may prevent action potential propagation and result in skeletal muscle fatigue. Associated with intense skeletal muscle contractions are large...... with control muscles, the resting metabolites ATP, phosphocreatine, creatine, and lactate, as well as the resting muscle excitability as measured by M-waves, were unaffected by treatment with BTS plus dantrolene. Following 20 or 30 s of continuous 60-Hz stimulation, BTS-plus-dantrolene-treated muscles showed...... changes in muscle metabolites. However, the role of metabolites in the loss of muscle excitability is not clear. The metabolic state of isolated rat extensor digitorum longus muscles at 30 degrees C was manipulated by decreasing energy expenditure and thereby allowed investigation of the effects of energy...

  10. Greening Public Buildings: ESCO-Contracting in Danish Municipalities

    Directory of Open Access Journals (Sweden)

    Jesper Rohr Hansen

    2013-05-01

    Full Text Available This paper presents current research on Danish municipalities’ use of Energy Service Companies (ESCO as a way to improve the standard of public buildings and to increase energy efficiency. In recent years more and more municipalities have used ESCO-contracts to retrofit existing public buildings, and to make them more energy efficient. At the moment 30 municipalities (of the 98 municipalities in Denmark are involved in, or preparing, ESCO contracts. Nevertheless, ESCO-contracting still faces many challenges on the Danish market, as there is a widespread skepticism towards the concept amongst many stakeholders. The purpose of this paper is to discuss the various experience gained so far by municipalities use of ESCO-contracting, the different approached to ESCO-contracting being used in practice, as well as the different viewpoints drivers and barriers behind the development. The strong growth in ESCO-contracts reflects that the ESCO-concept fits well with a number of present problems that municipalities are facing, as well as a flexible adaptation to the local context in different municipalities.

  11. Glycolysis in contracting rat skeletal muscle is controlled by factors related to energy state

    DEFF Research Database (Denmark)

    Ørtenblad, Niels; Macdonald, Will A; Sahlin, Kent

    2009-01-01

    The control of glycolysis in contracting muscle is not fully understood. The aim of the present study was to examine whether activation of glycolysis is mediated by factors related to the energy state or by a direct effect of Ca2+ on the regulating enzymes. Extensor digitorum longus muscles from...... and 58% of those in Con respectively. Glycolytic rate in BTS was only 51% of that in Con but the relative contribution of ATP derived from PCr (phosphocreatine) and glycolysis and the relation between muscle contents of PCr and Lac (lactate) were not different. Prolonged cyanide incubation of quiescent...... contribution of energy delivered from PCr and glycolysis during both conditions suggests that the glycolytic rate is controlled by factors related to energy state....

  12. Spatial interaction between tissue pressure and skeletal muscle perfusion during contraction

    NARCIS (Netherlands)

    Donkelaar, van C.C.; Huyghe, J.M.R.J.; Vankan, W.J.; Drost, M.R.

    2001-01-01

    The vascular waterfall theory attributes decreased muscle perfusion during contraction to increased intramuscular pressure (P_IM ) and concomitant increase in venous resistance. Although P_IM is distributed during contractions, this theory does not account for heterogeneity.This study hypothesises

  13. DOE standard: The Department of Energy Laboratory Accreditation Program administration

    International Nuclear Information System (INIS)

    1998-12-01

    This technical standard describes the US Department of Energy Laboratory Accreditation Program (DOELAP), organizational responsibilities, and the accreditation process. DOELAP evaluates and accredits personnel dosimetry and radiobioassay programs used for worker monitoring and protection at DOE and DOE contractor sites and facilities as required in Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection. The purpose of this technical standard is to establish procedures for administering DOELAP and acquiring accreditation

  14. Validation studies of the DOE-2 Building Energy Simulation Program. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, R.; Winkelmann, F.

    1998-06-01

    This report documents many of the validation studies (Table 1) of the DOE-2 building energy analysis simulation program that have taken place since 1981. Results for several versions of the program are presented with the most recent study conducted in 1996 on version DOE-2.1E and the most distant study conducted in 1981 on version DOE-1.3. This work is part of an effort related to continued development of DOE-2, particularly in its use as a simulation engine for new specialized versions of the program such as the recently released RESFEN 3.1. RESFEN 3.1 is a program specifically dealing with analyzing the energy performance of windows in residential buildings. The intent in providing the results of these validation studies is to give potential users of the program a high degree of confidence in the calculated results. Validation studies in which calculated simulation data is compared to measured data have been conducted throughout the development of the DOE-2 program. Discrepancies discovered during the course of such work has resulted in improvements in the simulation algorithms. Table 2 provides a listing of additions and modifications that have been made to various versions of the program since version DOE-2.1A. One of the most significant recent changes in the program occurred with version DOE-2.1E. An improved algorithm for calculating the outside surface film coefficient was implemented. In addition, integration of the WINDOW 4 program was accomplished resulting in improved ability in analyzing window energy performance. Validation and verification of a program as sophisticated as DOE-2 must necessarily be limited because of the approximations inherent in the program. For example, the most accurate model of the heat transfer processes in a building would include a three-dimensional analysis. To justify such detailed algorithmic procedures would correspondingly require detailed information describing the building and/or HVAC system and energy plant parameters

  15. U.S. DOE Southeast Clean Energy Application Center

    Energy Technology Data Exchange (ETDEWEB)

    Panzarella, Isaac [North Carolina State Univ., Raleigh, NC (United States); Mago, Pedro [North Carolina State Univ., Raleigh, NC (United States); Kalland, Stephen [North Carolina State Univ., Raleigh, NC (United States)

    2013-12-31

    Between 2010 and 2013, the U.S. Department of Energy (DOE) funded the Southeast Clean Energy Application Center (SE-CEAC), co-located at the North Carolina Solar Center at NC State University (NCSU) and at Mississippi State University. The SE-CEAC was one of eight regional CEACs established to promote and assist in transforming the market for combined heat and power (CHP), district energy (DE) and waste heat to power (WHP) throughout the U.S. CHP locates power generation at the point of demand and makes productive use of the residual thermal energy for process and space heating in factories and businesses, thus lowering the cost of meeting electricity and heat requirements and increasing energy efficiency. The overall goal of the SE-CEAC was to support end-user implementation and overall market transformation for CHP and related clean energy technologies. Five objectives were targeted to achieve the goal: 1. Market Analysis and Information Dissemination 2. Outreach and Education for Potential CHP End-users 3. Policy Support for State and Regional Stakeholders 4. Technical Assistance to Support CHP Deployment 5. Collaboration with DOE and other CEACs Throughout the project, the CEACs provided key services of education and outreach, technical assistance and market analysis in support of project objectives. These services were very effective at achieving key objectives of assisting prospective CHP end-users and informing policy makers, utilities and others about the benefits of CHP. There is a marked increase in the awareness of CHP technologies and applications as an energy resource among end-users, policymakers, utility regulators, electric utilities and natural gas utilities in the Southeast region as a result. At the end of 2013, a number of best-practice policies for CHP were applied or under consideration in various Southeast states. The SE-CEAC met its targets for providing technical assistance with over 50 analyses delivered for 412 MW of potential end

  16. Engineering and Statistical Research Institute contract reports to May, 1983

    Energy Technology Data Exchange (ETDEWEB)

    Thuns, A; Morrison, B A

    1983-06-01

    The purpose of this publication is to provide information on certain Canadian agricultural research contracts which are completed, published and available for loan. These contracts reports are documentation of research contracted out to non-federal government agencies, universities or individuals. Reports on contracts under the control of the Engineering and Statistical Research Institute are written by the contractor, and are reviewed by the scientific authority. Some reports date back to 1973, when the initial contracting program began. The first program was called DREAM (Development, Research, and Evaluation in Agricultural Mechanization). In 1977-78, projects under the Energy in Agriculture program were added. This was the beginning of the AERD (Agricultural Enginering Research and Development) program. In 1981, energy research had expanded and came under a separate progam called ERDAF (Energy Research and Development in Agriculture and Food). The remaining contract work stayed with the AERD program. This publication lists only contracts completed having final reports, and available contract reports with separate listings sorted by contract file number, title, author or subject.

  17. Strategic design of cost savings guarantee in energy performance contracting under uncertainty

    International Nuclear Information System (INIS)

    Deng, Qianli; Jiang, Xianglin; Cui, Qingbin; Zhang, Limao

    2015-01-01

    Highlights: • A methodology is proposed to assist Energy Service Companies to maintain competitiveness in winning bids. • Uncertainties within the energy cost savings are modeled stochastically using the Monte-Carlo simulation. • A strategic energy savings guarantee design curve is derived, where all points return as appropriate guarantees. • A campus case is presented to demonstrate the applicability for finding appropriate guaranteed savings value. - Abstract: Among the key barriers to profit in Energy Performance Contracting (EPC) are uncertainties about attaining the realized energy cost savings and potential disputes over the guaranteed cost savings. In this paper, a methodology has been proposed to assist the Energy Service Company (ESCO): (1) to evaluate the risk threshold if the guarantee has already been made, and (2) to determine the guarantee design, if the guarantee has not been made yet, that not only promises the ESCO’s profitability from EPC but also maintains its competitiveness to win the bid. Uncertainties within the energy cost savings are modeled stochastically using Monte-Carlo simulation, taking both the energy price fluctuation and the facility performance variability into account. Based on that, a strategic energy savings guarantee design curve is derived, that all the points on it would return as appropriate guarantees. Finally, a campus case is presented to demonstrate the applicability for finding the appropriate guaranteed savings value. This method is also worth popularizing in similar performance-based projects

  18. Does the PPE choose the right way towards energy transition?

    International Nuclear Information System (INIS)

    Beutier, Didier

    2016-01-01

    In this article, the author states the PPE (the French multi-year energy planning) does not seem to be the best way to reach objectives related to the reduction of greenhouse gas emissions. He first discusses the planned evolutions for renewable, fossil and nuclear energies. He states that the development of wind energy should take some impacts into account: wind energy requires 5 times more concrete, 20 times more steel and 20 times more ground surface than a nuclear plant. He states that France cannot afford stopping a performing industrial tool (nuclear plants)

  19. Contraction mode itself does not determine the level of mTORC1 activity in rat skeletal muscle.

    Science.gov (United States)

    Ato, Satoru; Makanae, Yuhei; Kido, Kohei; Fujita, Satoshi

    2016-10-01

    Resistance training with eccentric contraction has been shown to augment muscle hypertrophy more than other contraction modes do (i.e., concentric and isometric contraction). However, the molecular mechanisms involved remain unclear. The purpose of this study was to investigate the effect of muscle contraction mode on mammalian target of rapamycin complex 1 (mTORC1) signaling using a standardized force-time integral (load (weight) × contraction time). Male Sprague-Dawley rats were randomly assigned to three groups: eccentric contraction, concentric contraction, and isometric contraction. The right gastrocnemius muscle was exercised via percutaneous electrical stimulation-induced maximal contraction. In experiment 1, different modes of muscle contraction were exerted using the same number of reps in all groups, while in experiment 2, muscle contractions were exerted using a standardized force-time integral. Muscle samples were obtained immediately and 3 h after exercise. Phosphorylation of molecules associated with mTORC1 activity was assessed using western blot analysis. In experiment 1, the force-time integral was significantly different among contraction modes with a higher force-time integral for eccentric contraction compared to that for other contraction modes (P contraction compared to that for isometric contraction (P contraction than for other modes of contraction (P contraction was higher than isometric contraction (P contraction modes 3 h after exercise. Our results suggest that mTORC1 activity is not determined by differences in muscle contraction mode itself. Instead, mTORC1 activity is determined by differences in the force-time integral during muscle contraction. © 2016 The Authors. Physiological Reports published by Wiley Periodicals, Inc. on behalf of the American Physiological Society and The Physiological Society.

  20. DOE Heat Pump Centered Integrated Community Energy Systems Project

    Energy Technology Data Exchange (ETDEWEB)

    Calm, J. M.

    1979-01-01

    The Heat Pump Centered Integrated Community Energy Systems (HP-ICES) Project is a multiphase undertaking seeking to demonstrate one or more operational HP-ICES by the end of 1983. The seven phases include System Development, Demonstration Design, Design Completion, HP-ICES Construction, Operation and Data Acquisition, HP-ICES Evaluation, and Upgraded Continuation. This project is sponsored by the Community Systems Branch, Office of Buildings and Community Systems, Assistant Secretary for Conservation and Solar Applicaions, U.S. Department of Energy (DOE). It is part of the Community Systems Program and is managed by the Energy and Environmental Systems Division of Argonne Natinal Laboratory.

  1. DOE (Department of Energy) Epidemiologic Research Program: Selected bibliography

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    The objective of the Department of Energy (DOE) Epidemiologic Research Program is to determine the human health effects resulting from the generation and use of energy, and from the operation of DOE facilities. The program has been divided into seven general areas of activity: the Radiation Effects Research Foundation (RERF) which supports studies of survivors of the atomic weapons in Hiroshima and Nagasaki, mortality and morbidity studies of DOE workers, studies on internally deposited alpha emitters, medical/histologic studies, studies on the genetic aspects of radiation damage, community health surveillance studies, and the development of computational techniques and of databases to make the results as widely useful as possible. Excluding the extensive literature from the RERF, the program has produced 380 publications in scientific journals, contributing significantly to improving the understanding of the health effects of ionizing radiation exposure. In addition, a large number of public presentations were made and are documented elsewhere in published proceedings or in books. The purpose of this bibliograhpy is to present a guide to the research results obtained by scientists supported by the program. The bibliography, which includes doctoral theses, is classified by national laboratory and by year. Multi-authored studies are indicated only once, according to the main supporting laboratory.

  2. Planing contract between the State and the Environment and energy mastership Agency 2000-2006; Contrat de plan entre l'Etat et l'Agence de l'environnement et de la maitrise de l'energie 2000-2006

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This contract describes the mutual commitments between the French State and the ADEME (Agency for the Environment and the Energy Mastership) for 2000-2006. The subjects concerned are the domestic wastes management, the energy efficiency and the energy resources development, the air pollution decrease and the international agreements of the France. It presents the implementing and expected impacts of the action and research and development programs, the ADEME research policy, the contract management and the evaluation. (A.L.B.)

  3. High energy physics program at Texas A ampersand M University

    International Nuclear Information System (INIS)

    1992-12-01

    The Texas A ampersand M experimental high energy physics program has been supported since its inception by DOE Contract DE-AS05-81ER40039. During that period we established a viable experimental program at a university which before this time had no program in high energy physics. In 1990, the experimental program was augmented with a program in particle theory. In the accompanying final report, we outline the research work accomplished during the final year of this contract and the program being proposed for consideration by the Department of Energy for future grant support. Some of the particular areas covered are: Collider detector at Fermilab program; the TAMU MACRO program; SSC R ampersand D program; SSC experimental program; and theoretical physics program

  4. Testing the rationality of DOE's energy price forecasts under asymmetric loss preferences

    International Nuclear Information System (INIS)

    Mamatzakis, E.; Koutsomanoli-Filippaki, A.

    2014-01-01

    This paper examines the rationality of the price forecasts for energy commodities of the United States Department of Energy's (DOE), departing from the common assumption in the literature that DOE's forecasts are based on a symmetric underlying loss function with respect to positive vs. negative forecast errors. Instead, we opt for the methodology of Elliott et al. (2005) that allows testing the joint hypothesis of an asymmetric loss function and rationality and reveals the underlying preferences of the forecaster. Results indicate the existence of asymmetries in the shape of the loss function for most energy categories with preferences leaning towards optimism. Moreover, we also examine whether there is a structural break in those preferences over the examined period, 1997–2012. - Highlights: • Examine the rationality of DOE energy forecasts. • Departing from a symmetric underlying loss function. • Asymmetries exist in most energy prices. • Preferences lean towards optimism. • Examine structural breaks in those preferences

  5. 48 CFR 923.903 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... ENVIRONMENT, CONSERVATION, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Contractor Compliance With Environmental Management Systems § 923.903 Contract clause. The FAR Environmental Management Systems clause at.... Some DOE sites have a single Environmental Management System for the site while others have separate...

  6. 76 FR 2903 - Interconnection of the Proposed Hyde County Wind Energy Center Project (DOE/EIS-0461), and...

    Science.gov (United States)

    2011-01-18

    ... Wind Energy Center Project (DOE/EIS-0461), and Proposed Crowned Ridge Wind Energy Center Project (DOE... to prepare environmental impact statements (EISs) for the Hyde County Wind Energy Center Project and the Crowned Ridge Wind Energy Center Project in the Federal Register on November 30, 2010. Both...

  7. Update on DOE's Nuclear Energy University Program

    International Nuclear Information System (INIS)

    Lambregts, Marsha J.

    2009-01-01

    The Nuclear Energy University Program (NEUP) Office assists the U.S. Department of Energy Office of Nuclear Energy (DOE-NE) by administering its University Program. To promote accountable relationships between universities and the Technical Integration Offices (TIOs)/Technology Development Offices (TDOs), a process was designed and administered which includes two competitive Requests for Proposals (RFPs) and two Funding Opportunity Announcements (FOAs) in the following areas: (1) Research and Development (R and D) Grants, (2) Infrastructure improvement, and (3) Scholarships and Fellowships. NEUP will also host periodic reviews of university mission-specific R and D that document progress, reinforce accountability, and assess return on investment; sponsor workshops that inform universities of the Department's research needs to facilitate continued alignment of university R and D with NE missions; and conduct communications activities that foster stakeholder trust, serve as a catalyst for accomplishing NEUP objectives, and provide national visibility of NEUP activities and accomplishments. Year to date efforts to achieve these goals will be discussed.

  8. Muscle Contraction.

    Science.gov (United States)

    Sweeney, H Lee; Hammers, David W

    2018-02-01

    SUMMARYMuscle cells are designed to generate force and movement. There are three types of mammalian muscles-skeletal, cardiac, and smooth. Skeletal muscles are attached to bones and move them relative to each other. Cardiac muscle comprises the heart, which pumps blood through the vasculature. Skeletal and cardiac muscles are known as striated muscles, because the filaments of actin and myosin that power their contraction are organized into repeating arrays, called sarcomeres, that have a striated microscopic appearance. Smooth muscle does not contain sarcomeres but uses the contraction of filaments of actin and myosin to constrict blood vessels and move the contents of hollow organs in the body. Here, we review the principal molecular organization of the three types of muscle and their contractile regulation through signaling mechanisms and discuss their major structural and functional similarities that hint at the possible evolutionary relationships between the cell types. Copyright © 2018 Cold Spring Harbor Laboratory Press; all rights reserved.

  9. Does on-the-job informal learning in OECD countries differ by contract duration

    NARCIS (Netherlands)

    Ferreira Sequeda, M.T.; de Grip, A.; van der Velden, R.K.W.

    2015-01-01

    Several studies have shown that employees with temporary contracts have a lower training participation than those who have a contract of indefinite duration. There is however no empirical literature on the difference in informal learning on-the-job between permanent and temporary workers. In this

  10. Does on-the-job informal learning in OECD countries differ by contract duration?

    NARCIS (Netherlands)

    Ferreira Sequeda, M.T.; de Grip, A.; van der Velden, R.K.W.

    2015-01-01

    Several studies have shown that employees with temporary contracts have a lower training participation than those who have a contract of indefinite duration. There is however no empirical literature on the difference in informal learning on-the-job between permanent and temporary workers. In this

  11. Contract market power and its impact on the efficiency of the electricity sector

    International Nuclear Information System (INIS)

    Serra, Pablo

    2013-01-01

    This paper analyzes the pro-competitive effects of financial long-term contracts in oligopolistic electricity markets. This is done in a model that incorporates the main features of the industry: non-storable production, time-varying price-elastic demand, and sequential investment and production decisions. The paper considers contracts for difference that have as reference price the average spot price. Assuming that the spot market coordinator sets competitive prices, the paper shows that installed capacity increases with the quantity of energy contracted, reaching the welfare-maximizing capacity when energy contracted equals this same level. Next, the paper studies the case where the quantity of energy contracted is endogenous and contracts are traded before capacity decisions are taken. Regarding purchasers of contracts, two polar cases are considered: either they are price-taker speculators or they are an aggregation of consumers that auctions a long (buy) contract for a given energy quantity. In the former case the strike price equals the reference price, i.e., arbitrage is perfect, and the quantity of energy contracted falls short of the efficient level. In turn, in the latter case, the strike price equals the average efficient spot price. Moreover, an aggregation of all consumers would choose to auction the social optimum quantity. - Highlights: • The paper analyzes the pro-competitive impact of contracts for difference. • The reference price of contracts is the average spot price. • Installed capacity increases with total quantity of energy contracted. • Social welfare is maximized when energy contracted equals the efficient capacity. • An aggregation of all consumers would choose to auction the efficient quantity

  12. The French market of solutions for active energy efficiency. Energy, central home automation systems, consumption monitoring software, distributed load shedding, energy performance contract... which tools will stand out?

    International Nuclear Information System (INIS)

    2012-12-01

    This article presents the content of a market study which aimed at proposing an overview of solutions for energy efficiency and at assessing their impact on energy consumption, at identifying the growth dynamics of three market segments (assisted efficiency, automated efficiency and contract-based efficiency), at comparing the posture and strategies of the different actors present on this market (energy providers, equipment manufacturers, pure players, NTIC...), at identifying actors who are in the best position to benefit market development, and at imagining tomorrow's supply for energy efficiency. The report addresses the definition of active energy efficiency, the rationale of its development, the European regulatory and legal context, the strengthening of regulatory and environmental constraints in France, the three different market segments (examples, opportunities), and the competition context

  13. Proposal for the award of a contract for the provision of a high-speed data circuit to the USA

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for a high-speed data circuit for Wide Area Network (WAN) connectivity between CERN and the STARLIGHT Internet exchange in Chicago, USA. The contract will be negotiated on behalf of CERN and its partners, CNRS/IN2P3 (FR), the US Department of Energy (DoE) through the California Institute of Technology (Caltech), the US National Science Foundation (NSF), the Canadian high-energy physics community through Carleton University and the World Health Organisation in Geneva. Following a market survey carried out among 26 firms in nine Member States and three firms in the USA, a call for tenders (IT-2983/IT) was sent on 7 September 2001 to 17 firms in eight Member States. By the closing date, CERN had received 13 tenders from eight Member States. The Finance Committee is invited to agree to the negotiation, on behalf of CERN and its partners, of a contract for the provision of a high-speed data circuit to the USA, with KPNQWEST (NL), the lowest bidder (after realignment),...

  14. EMP Attachment 3 DOE-SC PNNL Site Dose Assessment Guidance

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, Sandra F.

    2011-12-21

    This Dose Assessment Guidance (DAG) describes methods to use to determine the Maximally-Exposed Individual (MEI) location and to estimate dose impact to that individual under the U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site Environmental Monitoring Plan (EMP). This guidance applies to public dose from radioactive material releases to the air from PNNL Site operations. This document is an attachment to the Pacific Northwest National Laboratory (PNNL) Environmental Monitoring Plan (EMP) and describes dose assessment guidance for radiological air emissions. The impact of radiological air emissions from the U.S. Department of Energy Office of Science (DOE-SC) PNNL Site is indicated by dose estimates to a maximally exposed member of the public, referred to as the maximally exposed individual (MEI). Reporting requirements associated with dose to members of the public from radiological air emissions are in 40 CFR Part 61.94, WAC 246-247-080, and DOE Order 458.1. The DOE Order and state standards for dose from radioactive air emissions are consistent with U.S. Environmental Protection Agency (EPA) dose standards in 40 CFR 61.92 (i.e., 10 mrem/yr to a MEI). Despite the fact that the current Contract Requirements Document (CRD) for the DOE-SC PNNL Site operations does not include the requirement to meet DOE CRD 458.1, paragraph 2.b, public dose limits, the DOE dose limits would be met when EPA limits are met.

  15. Specific performance as a primary remedy in the South African law of contract

    Directory of Open Access Journals (Sweden)

    Jean Chrysostome Kanamugire

    2015-07-01

    Full Text Available Specific performance is a primary remedy for breach of contract available for the aggrieved party. This order emphasises the performance of contractual obligations. Although the plaintiff can elect to claim specific performance from the defendant, the court has a discretion to grant or decline the order of specific performance. The discretion must be exercised judicially and does not confine on rigid rules. Courts decide each case according to its own facts and circumstances. Plaintiff has a right of election whether to claim specific performance from the defendant or damages for breach of contract. The defendant does not enjoy any choice in this matter. As a general rule, specific performance is not often awarded in the contract of services. However, recent developments have demonstrated that specific performance will usually be granted in employment contracts if there is equality of bargaining power among contracting parties and such order will not produce undue hardship to the defaulting party. Public policy generally favours the utmost freedom of contract and requires that parties should respect or honour their contractual obligations in commercial transactions. Public policy is rooted in the constitution and can sparingly be used to strike down contracts. Specific performance should not continue to be a primary remedy for breach of contract. Contracting parties should be allowed to resile from the contract and use damages as a remedy for breach of contract

  16. Evaluating information in multiple horizon forecasts. The DOE's energy price forecasts

    International Nuclear Information System (INIS)

    Sanders, Dwight R.; Manfredo, Mark R.; Boris, Keith

    2009-01-01

    The United States Department of Energy's (DOE) quarterly price forecasts for energy commodities are examined to determine the incremental information provided at the one-through four-quarter forecast horizons. A direct test for determining information content at alternative forecast horizons, developed by Vuchelen and Gutierrez [Vuchelen, J. and Gutierrez, M.-I. 'A Direct Test of the Information Content of the OECD Growth Forecasts.' International Journal of Forecasting. 21(2005):103-117.], is used. The results suggest that the DOE's price forecasts for crude oil, gasoline, and diesel fuel do indeed provide incremental information out to three-quarters ahead, while natural gas and electricity forecasts are informative out to the four-quarter horizon. In contrast, the DOE's coal price forecasts at two-, three-, and four-quarters ahead provide no incremental information beyond that provided for the one-quarter horizon. Recommendations of how to use these results for making forecast adjustments is also provided. (author)

  17. Why does the energy intensity of freight transport rise?

    Energy Technology Data Exchange (ETDEWEB)

    Scheele, D [Scientific Council for Government Policy (Netherlands)

    1996-12-01

    In advanced economies it is normal to observe declining energy intensities. Both improvements in conversion efficiency and in organisational efficiency of energy use cause energy demand to grow at a slower pace than the economy. In this context it is somewhat particular that in the vital sector of freight transport the energy intensity does not decline, but instead increases. The energy demand of this sector only takes a small share of the total energy demand. According to the World Energy Council the transport sector takes 30 percent of world energy demand and freight transport again takes 30 percent of the transport sector share, maritime transport excluded. Despite this small share some explanation is needed why the increase in energy demand form the volume growth of freight demand is not at least partly countered by a decline in the energy intensity. The purpose of this paper is to review some of the explanations that are given in the literature and to support these explanations with empirical evidence on the case of the Netherlands. (EG)

  18. What Does the Student Psychological Contract Mean? Evidence from a UK Business School

    Science.gov (United States)

    Koskina, Aikaterini

    2013-01-01

    Much has been written about psychological contracts in organisational contexts but very little in educational settings, especially within higher education. Using an exploratory single case study this article provides qualitative empirical evidence about the ways in which the psychological contract is perceived by a group of postgraduate students…

  19. 48 CFR 970.2304-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ..., Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2304-2 Contract clause. Link to an amendment published at 75 FR 57695, Sept. 22, 2010. The contracting officer shall insert the...

  20. Does Contract Farming Improve Smallholder Farmers Income? The Case of Avocado Farming in Kenya

    OpenAIRE

    Mwambi, Mercy; Oduol, Judith; Mshenga, Patience M.; Mwanarusi, Saidi

    2013-01-01

    Contract farming is seen by its proponents as a tool for creating new market opportunities as well as for providing credit and training, leading to increased incomes of smallholder farmers. Critics, however, argue that contract farming encourages unequal bargaining relationships with agribusiness firms and is likely to pass risks to farmers, thus favouring large scale farmers at the expense of smallholders. Another school of thought contends that the effect of contract farming on the liveliho...

  1. 48 CFR 908.1104 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 908.1104 Section 908.1104 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Leasing of Motor Vehicles 908.1104 Contract clauses. (f...

  2. Geothermal Energy Geopressure Subprogram, GCO-DOE, Pleasant Bayou No. 1

    Energy Technology Data Exchange (ETDEWEB)

    none

    1978-03-01

    This Environmental Assessment (EA) has been prepared to assess the environmental implications of the Department of Energy's proposal to drill, complete, and test one geopressure well located in Brazoria County on a 2 hectares (five acre) test site 64 km (40 mi) south of Houston, Abstract 107, Perry and Austin Survey, Brazoria County, TX. The test well is herein referred to as GCO-DOE Pleasant Bayou No. 1. A maximum of four disposal wells will be located within .8 km (1/2 mi) of the proposed well. The DOE and the University of Texas Center for Energy Studies propose to operate the test facility for three years to evaluate the geopressure potential of the subsurface. Tests to be conducted include flow rates, fluid composition, temperature, gas content, geologic characteristics, and the land subsidence potential for subsequent production.

  3. Harmonizing formal requirements for cross-border sales contracts

    Directory of Open Access Journals (Sweden)

    Peter Winship

    2012-07-01

    Full Text Available Legal systems have different traditions about how to “prove” a contract for the sale of personal property. Most legal systems today permit the contract to be proved by any means but some States require that the agreement be concluded in or evidenced by writing. The United Nations Convention on Contracts for the International Sale of Goods adopts a freedom-of-form rule but authorizes a State to declare that the rule does not apply when the seller or buyer has its place of business in that State. This essay studies the consequences of such a declaration. The Convention text does not expressly state the consequences. The Convention’s travaux préparatoires suggest that this silence was deliberate. Doctrine and court opinions are divided on whether the writing formalities of the declaring State always apply or the formalities, if any, of the law applicable by virtue of the rules of private international law govern. In the absence of a consensus, this essay argues that the writing formalities of the declaring State apply. The argument is based on the policies implicit in the decision of non-declaring Contracting States to adhere to a Convention that allows certain Contracting States to opt out of the freedom-of-form rule. The result is consistent with recent private international law treaties that, while providing liberal rules that favor freedom of form, direct application of the fundamental policies not only of the forum but also of other jurisdictions.

  4. Progress and plans for wind energy in the United States

    International Nuclear Information System (INIS)

    Ancona, D.F.; Goldman, P.R.; Thresher, R.W.

    1996-01-01

    Under its wind energy research and development program, the U.S. Department of Energy (DOE) works as a partner with industry to improve understanding of wind system technology and to develop and deploy advanced wind turbines in multi-regional markets. Installed capacity in the U.S. reached 1770 MW by the end of 1995. However, this figure does not include some capacity that was retired or brought off line. Growth of about 140 MW during 1995, is attributed to improved and lower cost turbines and was stimulated in part by the availability of energy tax credits and production and financial incentives. In addition, there are nearly 500 MW of firm contracts for new domestic wind plants. Recently, there has been substantial growth in both Europe and the rest of the world, those countries other than Europe and the U.S. The U.S. DOE Wind Energy Systems Program is continuing broad based research and technology development focusing on advanced wind turbine development. Contracts have been placed with industry for next generation design studies, innovative subsystems applied research, and value engineering to improve existing turbines. Some of these turbines are now being deployed in utility verification projects. Over the past year, the U.S. opened its National Wind Technology Center, located near Golden, Colorado. The center will include a new user facility to serve as a wind turbine blade and system testing and research center for industry. (author)

  5. Cross hedging and forward-contract pricing of electricity

    International Nuclear Information System (INIS)

    Woo, C.-K.; Hoang, K.; Horowitz, I.

    2001-01-01

    We consider the problem of an electric-power marketer offering a fixed-price forward contract to provide electricity that it purchases from a potentially volatile and unpredictable fledgling spot energy market. One option for the risk-averse marketer who wants to hedge against the spot-price volatility is to engage in cross hedging to reduce the contract's profit variance, and to determine the forward-contract price as a risk-adjusted price - the sum of a baseline price and a risk premium. We show how the marketer can estimate the spot-price relationship between two wholesale energy markets for the purpose of cross hedging, as well as the optimal hedge and the forward contract's baseline price and risk premium

  6. Energy storage systems cost update : a study for the DOE Energy Storage Systems Program.

    Energy Technology Data Exchange (ETDEWEB)

    Schoenung, Susan M. (Longitude 122 West, Menlo Park, CA)

    2011-04-01

    This paper reports the methodology for calculating present worth of system and operating costs for a number of energy storage technologies for representative electric utility applications. The values are an update from earlier reports, categorized by application use parameters. This work presents an update of energy storage system costs assessed previously and separately by the U.S. Department of Energy (DOE) Energy Storage Systems Program. The primary objective of the series of studies has been to express electricity storage benefits and costs using consistent assumptions, so that helpful benefit/cost comparisons can be made. Costs of energy storage systems depend not only on the type of technology, but also on the planned operation and especially the hours of storage needed. Calculating the present worth of life-cycle costs makes it possible to compare benefit values estimated on the same basis.

  7. Turnkey contracts

    International Nuclear Information System (INIS)

    Langetepe, G.

    1977-01-01

    To make energy available economically and in sufficient quantity is a main point for the future of an industrial and more for a developing country. The investment costs and the availability of a power plant and in particular for a nuclear power plant are the most significant factors in the economic operation of the plant. In the phase before signing the contract the essential decisions are made with high influence in the economic operation and the availability of the plant. A turn-key contract offers good possibilities to minimize the risks referring a) the plant quality and functionality, b) the plant investment cost, c) the plant completion date, d) the handling of the licensing procedures, e) the availability of the operation. The lecture mentions the points which are of high influence for a successful erection and operation period and which must be clarified before signing the contract between the buyer and supplier of the plant. (orig./HP) [de

  8. Natural gas market assessment: Long-term Canadian natural gas contracts

    International Nuclear Information System (INIS)

    1992-08-01

    A descriptive analysis is presented of the changes which have occurred and the developing trends in the long-term Canadian contracts governing the sale of western Canadian gas into the domestic and export markets from 1985 to 1991. The report is limited to domestic and export contracts for Canadian gas and does not include imported gas under contract. Contract structures prior to deregulation, the changing role of long-term contracts, size and duration of long-term contracts, and terms and conditions of long-term contracts are discussed. Important changes since the mid-1980s include: increased flexibility in long-term contracts enabling the parties to respond more readily to changing supply and demand conditions; greater balance between the buyer's obligation to purchase and the seller's obligation to deliver; flexible and increasingly simple pricing terms that track competitive market conditions; shorter contract terms; reduced contract volumes as smaller end-users and producer/marketers enter the market; and unbundling of gas sales and transportation service providing a wider range of contracting choices and options. 36 figs., 2 tabs

  9. Federal Energy Savings Performance Contracts: Frequently Asked Questions on the Scope of 42 U.S.C. § 8287 et seq.

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-12-21

    Document provides clarification and guidance on issues commonly raised regarding the scope of 42 U.S.C. § 8287 et seq. It is a supplement to the Federal Energy Management Program's extensive collection of materials that are available to assist federal agencies execute successful energy savings performance contract (ESPC) projects.

  10. Study of neutron-proton interaction in the 300-700 MeV energy region: Progress report, July 1987-August 1988

    International Nuclear Information System (INIS)

    Northcliffe, L.C.

    1988-08-01

    The experimental program supported by the present grant is a continuation of the work supported under DOE Contract AS05-76ER04449. More detailed discussion of the experimental apparatus and earlier activities can be found in annual reports for that contract. The primary objective of the program the is investigation of the nucleon-nucleon (NN) interaction, in the medium-energy region, in both elastic and inelastic channels. This paper reviews experiments dealing with these types of high energy collisions. 41 refs

  11. U.S. DOE’s Energy Treasure Hunt Exchange In-Plant Trainings – DOE Resources, Early Results and Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Nimbalkar, Sachin U. [ORNL; Brockway, Walter F. [ORNL; Lung, Bruce [U.S. Department of Energy (DOE); Thirumaran, Kiran [ORNL; Wenning, Thomas J. [ORNL

    2017-06-01

    The primary objective of the Department of Energy’s (DOE) Energy Treasure Hunt In-Plant Training (INPLT) is to train Better Plants partner employees to lead and conduct future energy efficiency Treasure Hunts within their facilities without DOE assistance. By taking a “learning-by-doing” approach, this INPLT, like other DOE INPLT trainings, has the added benefit of uncovering real energy and cost-saving opportunities. This INPLT leverages DOE and Better Plants technical staff, resources and tools and the EPA “Energy Treasure Hunt Guide: Simple Steps to Finding Energy Savings” process. While Treasure Hunts are a relatively well-known approach to identifying energy-savings in manufacturing plants, DOE is adding several additional elements in its Treasure Hunt Exchanges. The first element is technical assistance and methodology. DOE provides high-quality technical resources, such as energy efficiency calculators, fact sheets, source books etc., to facilitate the Treasure Hunt process and teaches four fundamentals: 1) how to profile equipment, 2) how to collect data, and 3), data & ROI calculation methodologies. Another element is the “train the trainer” approach wherein the training facilitator will train at least one partner employee to facilitate future treasure hunts. Another element is that DOE provides energy diagnostic equipment and teaches the participants how to use them. Finally, DOE also offers partners the opportunity to exchange teams of employees either within a partners’ enterprise or with other partners to conduct the treasure hunt in each other’s facilities. This exchange of teams is important because each team can bring different insights and uncover energy-saving opportunities that would otherwise be missed. This paper will discuss DOE methodology and the early results and lessons learned from DOE’S Energy Treasure Hunt In-Plant Trainings at Better Plants Partner facilities.

  12. BALTEX water and energy budgets in the NCEP/DOE reanalysis II

    Energy Technology Data Exchange (ETDEWEB)

    Roads, J. [Experimental Climate Prediction Center, Scripps Institution of Oceanography, La Jolla, CA (United States); Raschke, E. [Meteorologisches Institut der Universitaet Hamburg (Germany); Rocke, B. [Institute for Coastal Research, GKSS Research Center, Geesthacht (Germany)

    2002-07-01

    Water and energy budgets from the National Centers for Environmental Prediction/Dept. of Energy (NCEP/DOE) reanalysis II (NCEPRII) are described for the Baltic Sea catchment and sea (BALTEX). Annually, NCEPRII shows 0.7 mm d{sup -1} of atmospheric moisture converged into the land region with a corresponding runoff of 0.7 mm d{sup -1} to the Baltic Sea, consistent with observations. However, precipitation is too low; evaporation is too large; runoff does not have an appropriate winter minimum and spring maximum; the assimilation and surface nudging are too large. Important hydroclimatic characteristics can still be discerned. During summer, atmospheric water vapor, precipitation, evaporation, and surface and atmospheric radiative heating increase and the atmospheric radiative cooling, dry static energy convergence decrease. There are large contrasts between the sea and land; during winter sensible heat is transferred from the sea to the atmosphere and sea evaporation and precipitation are largest during the fall and winter; somewhat opposite behavior occurs over land. (orig.)

  13. Horn belief change: A contraction core

    CSIR Research Space (South Africa)

    Booth, R

    2010-08-01

    Full Text Available , and counterfactuals’, Artificial Intelligence, 57(2–3), 227–270, (1992). [5] S.O. Hansson, ‘Kernel contraction’, Journal of Symbolic Logic, 59(3), 845–859, (1994). [6] M. Langlois, R. Sloan, B. Szo¨re´nyi, and G. Thra´n, ‘Horn complements: Towards Horn... e-contractions. The argument is based on the observation that the convexity result for full propositional logic [2, Proposition 2.1] does not hold for Horn logic. Example 1 Let H = CnHL(fp! q; q ! rg). Then, for the e- contraction of H with p ! r...

  14. Invalidity of contract: legislative regulation and types

    Directory of Open Access Journals (Sweden)

    Василь Іванович Крат

    2017-09-01

    Full Text Available Invalidity contracts always attracted attention researchers. Without regard to it, in modern conditions there is an enormous layer of the problems related to invalidity contract, that to require a doctrine and utilitarian comprehension. The article is sanctified to research invalidity contract. In the article analyses problems of the legislative regulation and types of invalidity contract through the prism of judicial practice. In the Civil code of Ukraine, a voidable contract sets as a common rule. A voidable of the contract is incarnated in the so-called «virtual» invalidity when only the most typical grounds are enumerated. However, even such approach does not allow to overcome all possible cases that arise up in practice. Such situation touches possibility of voidable contracts concluded with the purpose of to shut out the appeal of claim to the property of the debtor. Therefore it follows to set general rules in relation to voidable contracts of the debtor. A nullity of the contract takes place only in the case when there is the direct pointing of law on the qualification of that or another contract as the nullity. The nullity of contract in the Civil code of Ukraine is constructed by means of «textual» invalidity. There are no single attempts to use the construction of «virtual» invalidity in judicial practice when there is the direct pointing of law on the qualification of that or another contract as the nullity, that is impermissible. Methodologically incorrectly to carry out identifying of invalidity contract and obligation with the aim of providing of application of different after the rich in content filling norms.

  15. Nuclear waste problem: does new Europe need new nuclear energy?

    International Nuclear Information System (INIS)

    Alekseev, P.; Dudnikov, A.; Subbotin, S.

    2003-01-01

    Nuclear Energy for New Europe - what does it mean? New Europe - it means in first order joined Europe. And it is quite clear that also efforts in nuclear energy must be joined. What can be proposed as a target of joint efforts. Improvement of existing plants, technologies, materials? - Certainly, but it is performed already by designers and industry themselves. There exists a problem, which each state using nuclear energy faces alone. It is nuclear waste problem. Nowadays nuclear waste problem is not completely solved in any country. It seems reasonable for joining Europe to join efforts in solving this problem. A satisfactory solution would reduce a risk connected with nuclear waste. In addition to final disposal problem solution it is necessary to reduce total amount of nuclear waste, that means: reducing the rates of accumulation of long-lived dangerous radionuclides; reducing the existing amounts of these radionuclides by transmutation. These conditions can be satisfied in reasonable time by burning of minor actinides and, if possible, by transmutation of long-lived fission products. However we can use this strategy effectively if we will design and construct nuclear energy as a system of which components are united by nuclear fuel cycle as a system-forming factor. The existing structures and approaches may become insufficient for new Europe. Therefore among the initial steps in considering nuclear waste problem must be considering possible promising fuel cycles for European nuclear energy. So, does new Europe need new nuclear energy? It seems, yes. (author)

  16. A Model for Sustainable Building Energy Efficiency Retrofit (BEER) Using Energy Performance Contracting (EPC) Mechanism for Hotel Buildings in China

    Science.gov (United States)

    Xu, Pengpeng

    Hotel building is one of the high-energy-consuming building types, and retrofitting hotel buildings is an untapped solution to help cut carbon emissions contributing towards sustainable development. Energy Performance Contracting (EPC) has been promulgated as a market mechanism for the delivery of energy efficiency projects. EPC mechanism has been introduced into China relatively recently, and it has not been implemented successfully in building energy efficiency retrofit projects. The aim of this research is to develop a model for achieving the sustainability of Building Energy Efficiency Retrofit (BEER) in hotel buildings under the Energy Performance Contracting (EPC) mechanism. The objectives include: • To identify a set of Key Performance Indicators (KPIs) for measuring the sustainability of BEER in hotel buildings; • To identify Critical Success Factors (CSFs) under EPC mechanism that have a strong correlation with sustainable BEER project; • To develop a model explaining the relationships between the CSFs and the sustainability performance of BEER in hotel building. Literature reviews revealed the essence of sustainable BEER and EPC, which help to develop a conceptual framework for analyzing sustainable BEER under EPC mechanism in hotel buildings. 11 potential KPIs for sustainable BEER and 28 success factors of EPC were selected based on the developed framework. A questionnaire survey was conducted to ascertain the importance of selected performance indicators and success factors. Fuzzy set theory was adopted in identifying the KPIs. Six KPIs were identified from the 11 selected performance indicators. Through a questionnaire survey, out of the 28 success factors, 21 Critical Success Factors (CSFs) were also indentified. Using the factor analysis technique, the 21 identified CSFs in this study were grouped into six clusters to help explain project success of sustainable BEER. Finally, AHP/ANP approach was used in this research to develop a model to

  17. Cross hedging and forward-contract pricing of electricity

    Energy Technology Data Exchange (ETDEWEB)

    Woo, C.-K.; Hoang, K. [Energy and Environmental Economics, Inc., 353 Sacramento Street, Suite 1700, 94111 San Francisco, CA (United States); Horowitz, I. [Decision and Information Sciences, Warrington College of Business Administration, University of Florida, 32611 Gainesville, FL (United States)

    2001-01-01

    We consider the problem of an electric-power marketer offering a fixed-price forward contract to provide electricity that it purchases from a potentially volatile and unpredictable fledgling spot energy market. One option for the risk-averse marketer who wants to hedge against the spot-price volatility is to engage in cross hedging to reduce the contract's profit variance, and to determine the forward-contract price as a risk-adjusted price - the sum of a baseline price and a risk premium. We show how the marketer can estimate the spot-price relationship between two wholesale energy markets for the purpose of cross hedging, as well as the optimal hedge and the forward contract's baseline price and risk premium.

  18. Hydrogen energy systems studies

    Energy Technology Data Exchange (ETDEWEB)

    Ogden, J.M.; Steinbugler, M.; Dennis, E. [Princeton Univ., NJ (United States)] [and others

    1995-09-01

    For several years, researchers at Princeton University`s Center for Energy and Environmental Studies have carried out technical and economic assessments of hydrogen energy systems. Initially, we focussed on the long term potential of renewable hydrogen. More recently we have explored how a transition to renewable hydrogen might begin. The goal of our current work is to identify promising strategies leading from near term hydrogen markets and technologies toward eventual large scale use of renewable hydrogen as an energy carrier. Our approach has been to assess the entire hydrogen energy system from production through end-use considering technical performance, economics, infrastructure and environmental issues. This work is part of the systems analysis activity of the DOE Hydrogen Program. In this paper we first summarize the results of three tasks which were completed during the past year under NREL Contract No. XR-11265-2: in Task 1, we carried out assessments of near term options for supplying hydrogen transportation fuel from natural gas; in Task 2, we assessed the feasibility of using the existing natural gas system with hydrogen and hydrogen blends; and in Task 3, we carried out a study of PEM fuel cells for residential cogeneration applications, a market which might have less stringent cost requirements than transportation. We then give preliminary results for two other tasks which are ongoing under DOE Contract No. DE-FG04-94AL85803: In Task 1 we are assessing the technical options for low cost small scale production of hydrogen from natural gas, considering (a) steam reforming, (b) partial oxidation and (c) autothermal reforming, and in Task 2 we are assessing potential markets for hydrogen in Southern California.

  19. 41 CFR 102-192.25 - Does this part apply to me?

    Science.gov (United States)

    2010-07-01

    ... MANAGEMENT Introduction to this Part § 102-192.25 Does this part apply to me? Yes, this part applies to you... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Does this part apply to me? 102-192.25 Section 102-192.25 Public Contracts and Property Management Federal Property...

  20. 10 CFR 603.1000 - Contracting officer's responsibilities at time of award.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Contracting officer's responsibilities at time of award. 603.1000 Section 603.1000 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Executing the Award § 603.1000 Contracting officer's responsibilities at time of award...

  1. 48 CFR 932.102 - Description of contract financing methods.

    Science.gov (United States)

    2010-10-01

    ... financing methods. 932.102 Section 932.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 932.102 Description of contract financing methods. (e)(2) Progress payments based on a percentage or stage of...

  2. Book-Smart, Not Street-Smart: Blockchain-Based Smart Contracts and The Social Workings of Law

    Directory of Open Access Journals (Sweden)

    Karen E. C. Levy

    2017-02-01

    Full Text Available This paper critiques blockchain-based “smart contracts,” which aim to automatically and securely execute obligations without reliance on a centralized enforcement authority. Though smart contracts do have some features that might serve the goals of social justice and fairness, I suggest that they are based on a thin conception of what law does, and how it does it. Smart contracts focus on the technical form of contract to the exclusion of the social contexts within which contracts operate, and the complex ways in which people use them. In the real world, contractual obligations are enforced through all kinds of social mechanisms other than formal adjudication—and contracts serve many functions that are not explicitly legal in nature, or even designed to be formally enforced. I describe three categories of contracting practices in which people engage (the inclusion of facially unenforceable terms, the inclusion of purposefully underspecified terms, and willful nonenforcement of enforceable terms to illustrate how contracts actually “work.” The technology of smart contracts neglects the fact that people use contracts as social resources to manage their relations. The inflexibility that they introduce, by design, might short-circuit a number of social uses to which law is routinely put. Therefore, I suggest that attention to the social and relational contexts of contracting are essential considerations for the discussion, development, and deployment of smart contracts.

  3. A study of the contract terms offered by the regional electricity companies to generators of renewable energy outside the NFFO

    International Nuclear Information System (INIS)

    Williams, N.C.; Limbrick, A.J.

    1996-01-01

    The aim of this study was to review the terms and conditions of contract for the purchase of renewable energy currently offered by the Regional Electricity Companies (RECs) outside the Non-Fossil Fuel Obligation (NFFO), through consultation with electricity generators. It focused on projects contracted under the first and second tranches of the NFFO, and those which have been developed outside this support mechanism (both renewable and fossil-fuelled), but which are characterised by being ''embedded'' in the RECs' distribution networks. (UK)

  4. Contract law--it's only as good as the people.

    Science.gov (United States)

    George, James

    2004-02-01

    There is a frequently spoken phrase in law known as "Res Ipsa Loquitur." This Latin phrase translates in English to mean, "The thing speaks for itself." It is hoped the title of this article speaks for itself. The simple truth is that a contract is only as good as the people and institutions it binds. This does not mean that contracts should not exist or that important details of a contractual relationship should not be in writing. In essence, contracts are society's best attempt to memorialize the details of a business relationship between people and entities.

  5. Optimization of portfolio of contracts for companies of electric power generation

    International Nuclear Information System (INIS)

    Gunn, Laura Keiko; Silva, Elisa Bastos; Correia, Paulo de Barros

    2010-01-01

    Portfolio optimization is a technique widely used to select investments in economic and financial zones. In the Brazilian Electric Market the portfolio models must consider not only different types of contracts used in the free market, but also different types of markets: the free market, the captive market and the spot market. Normally, the question is knowing which proportion of energy should be sold in each market, in order to maximize the return and minimize the risk. This article deals with a problem from the point of view of a power generator, where their objective is to maximize its profit, to serve their obligations regarding the delivery of energy and minimizing the risk associated with the occurrence of Spot Price - minimum (Spot Price). It is considered that the generator has flexible contracts and inflexible contracts to sell the energy. Inflexible contracts have delivery obligations of fixed energy and flexible contracts allow, the holder of the flexibility, to deliver or to receive an amount of variable energy. In this case, the holder of flexibility may be the purchaser or the generator. (author)

  6. 48 CFR 916.203 - Fixed-price contracts with economic price adjustments.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Fixed-price contracts with economic price adjustments. 916.203 Section 916.203 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Fixed-Price Contracts 916.203 Fixed...

  7. Does infrastructure provision hinder energy integration? The case of natural gas in the southern cone

    Energy Technology Data Exchange (ETDEWEB)

    Navajas, Fernando

    2010-09-15

    This paper uses evidence on policies, markets and private transactions to discuss the experience of natural gas infrastructure integration in the Southern Cone of Latin America. The argument is that contracts on international exchanges supported by infrastructure may become incomplete due to contingencies related to policy-induced price distortions not anticipated at the moment of writing. Beyond regulatory risk mitigation, it calls for back-up contract provisions designed to cope with aggregate imbalances and for some supranational coordination related to information about market conditions and on energy planning dialogues that test consistency and stress situations in markets where exports originate.

  8. Pacific Northwest Laboratory annual report for 1992 to the DOE Office of Energy Research

    Energy Technology Data Exchange (ETDEWEB)

    Schrempf, R.E. (ed.)

    1993-04-01

    Within the US Department of Energy's (DOE's) Office of Health and Environmental Research (OHER), the atmospheric sciences and carbon dioxide research programs are part of the Environmental Sciences Division (ESD). One of the central missions of the division is to provide the DOE with scientifically defensible information on the local, regional, and global distributions of energy-related pollutants and their effects on climate. This information is vital to the definition and implementation of a sound national energy strategy. This volume reports on the progress and status of all OHER atmospheric science and climate research projects at the Pacific Northwest Laboratory (PNL). PNL has had a long history of technical leadership in the atmospheric sciences research programs within OHER. Within the ESD, the Atmospheric Chemistry Program (ACP) continues DOE's long-term commitment to study the continental and oceanic fates of energy-related air pollutants. Research through direct measurement, numerical modeling, and laboratory studies in the ACP emphasizes the long-range transport, chemical transformation, and removal of emitted pollutants, oxidant species, nitrogen-reservoir species, and aerosols. The Atmospheric Studies in Complex Terrain (ASCOT) program continues to apply basic research on density-driven circulations and on turbulent mixing and dispersion in the atmospheric boundary layer to the micro- to mesoscale meteorological processes that affect air-surface exchange and to emergency preparedness at DOE and other facilities. Research at PNL provides basic scientific underpinnings to DOE's program of global climate research. Research projects within the core carbon dioxide and ocean research programs are now integrated with those in the Atmospheric Radiation Measurements (ARM), the Computer Hardware, Advanced Mathematics and Model Physics (CHAMMP), and Quantitative Links programs to form DOE's contribution to the US Global Change Research

  9. Transportation Energy Data Book, Edition 19

    Energy Technology Data Exchange (ETDEWEB)

    Davis, S.C.

    1999-09-01

    The Transportation Energy Data Book: Edition 19 is a statistical compendium prepared and published by Oak Ridge National Laboratory (ORNL) under contract with the Office of Transportation Technologies in the Department of Energy (DOE). Designed for use as a desk-top reference, the data book represents an assembly and display of statistics and information that characterize transportation activity, and presents data on other factors that influence transportation energy use. The purpose of this document is to present relevant statistical data in the form of tables and graphs. The latest editions of the Data Book are available to a larger audience via the Internet (http://www-cta.ornl.gov/data/tedb.htm).

  10. Planing contract between the State and the Environment and energy mastership Agency 2000-2006; Contrat de plan entre l'Etat et l'Agence de l'environnement et de la maitrise de l'energie 2000-2006

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This contract describes the mutual commitments between the French State and the ADEME (Agency for the Environment and the Energy Mastership) for 2000-2006. The subjects concerned are the domestic wastes management, the energy efficiency and the energy resources development, the air pollution decrease and the international agreements of the France. It presents the implementing and expected impacts of the action and research and development programs, the ADEME research policy, the contract management and the evaluation. (A.L.B.)

  11. Federal Energy Administration's contract with the Advertising Council, Inc. , for a public relations campaign on the need to save energy. Report to the chairman, Subcommittee on Energy and Power, House Committee on Interstate and Foreign Commerce

    Energy Technology Data Exchange (ETDEWEB)

    1977-08-31

    This report is in response to a request for an audit of the Federal Energy Administration's contract with The Advertising Council, Inc., for a public-service advertising campaign on energy conservation. Significant aspects of the audit are summarized in the report's digest.

  12. Lessons learned with ISO 14001 at DOE sites

    Energy Technology Data Exchange (ETDEWEB)

    Wilkinson, C. H., LLNL

    1998-03-01

    ISO 14001 is the international standard for environmental management systems (EMS). The standard applies the `plan, do, check, act` management system model to assure that the environmental impacts of operations are fully considered in planning and facility operations. ISO 14001 has grown in popularity in both the public and the private sector and has seen increasing utility within the U.S. Department of Energy (DOE). While there is no final DOE policy or requirement for ISO 14001 EMS implementation, ISO 14001 commands an active presence at many DOE sites. In general, the impetus for ISO 14001 in the DOE complex has been either an initiative by site management contractors to improve performance, or an actual requirement in the new management contracts for the sites. Several DOE sites now are committed to implement EMS`s in conformance with ISO 14001: Brookhaven National Laboratory (BNL), Hanford, Idaho National Engineering and Environmental Laboratory (INEEL), Kansas City Plant, Nevada Test Site, Savannah River Site (SRS), Waste Isolation Pilot Project (WIPP), West Valley. Several other DOE sites are expected to proceed in the near future with an EMS consistent with ISO 14001. However, not all sites are proceeding with an ISO 14001 EMS based on individual site business considerations. This paper describes the status of EMS implementation at these sites and identifies lessons learned that may be of use to other DOE sites.

  13. High energy density plasma physics using high intensity lasers: past and future

    International Nuclear Information System (INIS)

    Hogan, W.J.

    1999-01-01

    Inertial Confinement Fusion (ICF) research in the US is in a dynamic upswing based on the construction of the National Ignition Facility (NIF). The US Congress has appropriated more than two-thirds of the funds necessary to build NIF. The NIF laser building shell is complete, the concrete structure for the target area is rising above ground level, and contracts for producing the laser hardware are rapidly going into place. The entire facility will be complete by the end of 2003 with eight beams becoming operational at the end of 2001 to begin experiments. All external reviews have recommended that the DOE encourage international collaborations on NIF and the DOE has directed the Project Team to design the facility so that is possible. The DOE has begun expanding several bilateral agreements on fusion energy to include inertial fusion energy (IFE). The DOE has also proposed to the International Energy Agency that its fusion energy activities include IFE. This paper will describe how NIF and the ICF Program intend to implement these changes and outlines some of the proposed experiments

  14. The DOE fellows program-a workforce development initiative for the US department of energy

    Energy Technology Data Exchange (ETDEWEB)

    Lagos, Leonel E. [Applied Research Center, Florida International University, 10555 West Flagler St, EC2100, Miami, Florida (United States)

    2013-07-01

    The US Department of Energy Office of Environmental Management (DOE-EM) oversees one of the largest and most technically challenging cleanup programs in the world. The mission of DOE-EM is to complete the safe cleanup of the environmental legacy from five decades of nuclear weapons development and government-sponsored nuclear energy research. Since 1995, Florida International University's Applied Research Center (FIU-ARC) has supported the DOE-EM mission and provided unique research capabilities to address some of these highly technical and difficult challenges. This partnership has allowed FIU-ARC to create a unique infrastructure that is critical for the training and mentoring of science, technology, engineering, and math (STEM) students and has exposed many STEM students to 'hands-on' DOE-EM applied research, supervised by the scientists and engineers at ARC. As a result of this successful partnership between DOE and FIU, DOE requested FIU-ARC to create the DOE-FIU Science and Technology Workforce Development Initiative in 2007. This innovative program was established to create a 'pipeline' of minority STEM students trained and mentored to enter DOE's environmental cleanup workforce. The program was designed to help address DOE's future workforce needs by partnering with academic, government and private companies (DOE contractors) to mentor future minority scientists and engineers in the research, development, and deployment of new technologies and processes addressing DOE's environmental cleanup challenges. Since its inception in 2007, the program has trained and mentored 78 FIU STEM minority students. Although, the program has been in existence for only six years, a total of 75 internships have been conducted at DOE National Laboratories, DOE sites, DOE Headquarters and field offices, and DOE contractors. Over 100 DOE Fellows have participated in the Waste Management (WM) Symposia since 2008 with a total of 84 student

  15. The DOE fellows program-a workforce development initiative for the US department of energy

    International Nuclear Information System (INIS)

    Lagos, Leonel E.

    2013-01-01

    The US Department of Energy Office of Environmental Management (DOE-EM) oversees one of the largest and most technically challenging cleanup programs in the world. The mission of DOE-EM is to complete the safe cleanup of the environmental legacy from five decades of nuclear weapons development and government-sponsored nuclear energy research. Since 1995, Florida International University's Applied Research Center (FIU-ARC) has supported the DOE-EM mission and provided unique research capabilities to address some of these highly technical and difficult challenges. This partnership has allowed FIU-ARC to create a unique infrastructure that is critical for the training and mentoring of science, technology, engineering, and math (STEM) students and has exposed many STEM students to 'hands-on' DOE-EM applied research, supervised by the scientists and engineers at ARC. As a result of this successful partnership between DOE and FIU, DOE requested FIU-ARC to create the DOE-FIU Science and Technology Workforce Development Initiative in 2007. This innovative program was established to create a 'pipeline' of minority STEM students trained and mentored to enter DOE's environmental cleanup workforce. The program was designed to help address DOE's future workforce needs by partnering with academic, government and private companies (DOE contractors) to mentor future minority scientists and engineers in the research, development, and deployment of new technologies and processes addressing DOE's environmental cleanup challenges. Since its inception in 2007, the program has trained and mentored 78 FIU STEM minority students. Although, the program has been in existence for only six years, a total of 75 internships have been conducted at DOE National Laboratories, DOE sites, DOE Headquarters and field offices, and DOE contractors. Over 100 DOE Fellows have participated in the Waste Management (WM) Symposia since 2008 with a total of 84 student

  16. Contract theory and EU Contract Law

    OpenAIRE

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories are largely irreconcilable with the contract law of the EU. The paper further addresses the main implications of this mismatch, both for contract theory and for EU contract law. It suggests that in...

  17. Success factors of energy performance contracting (EPC) for sustainable building energy efficiency retrofit (BEER) of hotel buildings in China

    International Nuclear Information System (INIS)

    Xu Pengpeng; Chan, Edwin Hon-Wan; Queena Kun Qian

    2011-01-01

    Hotel building is a type of high-energy-consuming building and most existing hotel buildings need energy efficiency improvement in China. Energy performance contracting (EPC) is considered a win-win mechanism to organize building energy efficiency retrofit (BEER) project. However, EPC mechanism has been introduced into China relatively recently and many EPCs have not been successful in building energy efficiency retrofit projects. This research aims to develop a set of critical success factors (CSFs) of EPC for sustainable energy efficiency retrofit (BEER) of hotel buildings in China. Semi-structured interviews and a questionnaire survey with practitioners and other professionals were conducted. The findings reveal the relative importance of the 21 number of identified success factors. In order to explore the underlying relationship among the identified critical success factors (CSFs), factor analysis method was adopted for further investigation, which leads to grouping the 21 identified CSFs into six clusters. These are (1) project organization process, (2) EPC project financing for hotel retrofit, (3) knowledge and innovation of EPC, sustainable development (SD), and M and V, (4) implementation of sustainable development strategy, (5) contractual arrangement, and (6) external economic environment. Finally, several relevant policies were proposed to implement EPC successfully in sustainable BEER in hotel buildings. - Highlights: → EPC is a win-win mechanism to organize building energy efficiency retrofit project. → CSFs of EPC mechanism for sustainable BEER of hotel building in China are examined. → Six clusters are extracted from 21 identified CSFs based on factor analysis.

  18. Group contractions in quantum field theory

    International Nuclear Information System (INIS)

    Concini, C. De; Vitiello, G.

    1979-01-01

    General theorems are given for SU(n) and SO(n). A projective geometry argument is also presented with disclosure of the occurrence a group contraction mechanism as a geometric consequence of spontaneous breakdown of symmetry. It is also shown that a contraction of the conformal group gives account of the number of degrees of freedom of an n-pseudoparticle system in an Euclidean SU(2) gauge invariant Yang-Mills theory, in agreement with the result obtained by algebraic geometry methods. Low-energy theorems and ordered states symmetry patterns are observable manifestations of group contractions. These results seem to support the conjecture that the transition from quantum to classical physics involves a group contraction mechanism. (author)

  19. 48 CFR 936.609-3 - Work oversight in architect-engineer contracts.

    Science.gov (United States)

    2010-10-01

    ... architect-engineer contracts. 936.609-3 Section 936.609-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 936.609-3 Work oversight in architect-engineer contracts. In addition to the clause at 48...

  20. Reflex muscle contraction in anterior shoulder instability.

    Science.gov (United States)

    Wallace, D A; Beard, D J; Gill, R H; Eng, B; Carr, A J

    1997-01-01

    Reduced proprioception may contribute to recurrent anterior shoulder instability. Twelve patients with unilateral shoulder instability were investigated for evidence of deficient proprioception with an activated pneumatic cylinder and surface electromyography electrodes; the contralateral normal shoulder was used as a control. The latency between onset of movement and the detection of muscle contraction was used as an index of proprioception. No significant difference in muscle contraction latency was detected between the stable and unstable shoulders, suggesting that there was no significant defect in muscular reflex activity. This study does not support the use proprioception-enhancing physiotherapy in the treatment of posttraumatic anterior shoulder instability.

  1. MODIFICATION OF SEA ANEMONE BEHAVIOR BY SYMBIOTIC ZOOXANTHELLAE: EXPANSION AND CONTRACTION.

    Science.gov (United States)

    Pearse, Vicki Buchsbaum

    1974-12-01

    The pattern of expansion and contraction by the sea anemone Anthopleura elegantissima differs in individuals with or without endosymbiotic zooxanthellae. Anemones without zooxanthellae, found in dark habitats, do not regularly expand or contract under changes in light. Anemones with zooxanthellae expand in moderate light and contract in intense light or in darkness, with striking uniformity. However, this behavior does not always depend directly on the presence of zooxanthellae. Anemones that have previously had endosymbiotic zooxanthellae subsequently expand and contract with changes in light in the absence of these algae. Thus, conditioned responses may be involved. It is suggested that expansion and contraction of the anemones may play an important role in favorably regulating the amount of light to which their zooxanthellae are exposed.

  2. 41 CFR 109-38.502-50 - DOE guidelines.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false DOE guidelines. 109-38.502-50 Section 109-38.502-50 Public Contracts and Property Management Federal Property Management... guidelines. (a) Whenever practicable and cost effective, commercial service facilities shall be utilized for...

  3. Natural gas contracts in efficient portfolios

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, R.J.

    1994-12-01

    This report addresses the {open_quotes}contracts portfolio{close_quotes} issue of natural gas contracts in support of the Domestic Natural Gas and Oil Initiative (DGOI) published by the U.S. Department of Energy in 1994. The analysis is a result of a collaborative effort with the Public Service Commission of the State of Maryland to consider {open_quotes}reforms that enhance the industry`s competitiveness{close_quotes}. The initial focus of our collaborative effort was on gas purchasing and contract portfolios; however, it became apparent that efficient contracting to purchase and use gas requires a broader consideration of regulatory reform. Efficient portfolios are obtained when the holder of the portfolio is affected by and is responsible for the performance of the portfolio. Natural gas distribution companies may prefer a diversity of contracts, but the efficient use of gas requires that the local distribution company be held accountable for its own purchases. Ultimate customers are affected by their own portfolios, which they manage efficiently by making their own choices. The objectives of the DGOI, particularly the efficient use of gas, can be achieved when customers have access to suppliers of gas and energy services under an improved regulatory framework. The evolution of the natural gas market during the last 15 years is described to account for the changing preferences toward gas contracts. Long-term contracts for natural gas were prevalent before the early 1980s, primarily because gas producers had few options other than to sell to a single pipeline company, and this pipeline company, in turn, was the only seller to a gas distribution company.

  4. Proofs of Contracted Length Non-covariance

    International Nuclear Information System (INIS)

    Strel'tsov, V.N.

    1994-01-01

    Different proofs of contracted length non covariance are discussed. The way based on the establishment of interval inconstancy (dependence on velocity) seems to be the most convincing one. It is stressed that the known non covariance of the electromagnetic field energy and momentum of a moving charge ('the problem 4/3') is a direct consequence of contracted length non covariance. 8 refs

  5. DOE Zero Energy Ready Home Case Study: Durable Energy Builders - Houston, Texas

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-11-01

    This case study describes a DOE Zero Energy Ready Home in Houston, Texas, that scored HERS 39 without PV and HERS 29 with PV. This 5,947 ft2 custom home has 11.5-inch ICF walls. The attic is insulated along the roof line with 5 to 7 inches of open-cell spray foam. Most of the home's drinking water is supplied by a 11,500-gallon rainwater cistern. Hurricane strapping connects the roof to the walls. The triple-pane windows are impact resistant. The foundation is a raised slab.

  6. 41 CFR 301-73.1 - What does the Federal travel management program include?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false What does the Federal travel management program include? 301-73.1 Section 301-73.1 Public Contracts and Property Management... PROGRAMS General Rules § 301-73.1 What does the Federal travel management program include? The Federal...

  7. Getting more than contractually guaranteed. Five years energy conservation contracting in the clinic Bremerhaven; Mehr bekommen als vertraglich garantiert. Fuenf Jahre Energiespar-Contracting im Klinikum Bremerhaven

    Energy Technology Data Exchange (ETDEWEB)

    Breuer, Juergen [Klinikum Bremerhaven-Reinkenheide (Germany); Habel, Birger; Harneit, Maurice; Kahmann, Lars [Siemens AG, Region Nord (Germany). Building Technologies Div.

    2012-04-15

    Most hospitals in Germany virtually throw their money out the window - for heat that could be produced more efficiently, for air that would not be worked up or for coldness which is produced at the wrong place at the wrong time and with low efficiency. Quite different in the Hospital Bremerhaven-Reinkenheide (Bremerhaven, Federal Republic of Germany): In 2004, the hospital administration decided for energetic modernization of building systems based on energy performance contracting with 25% of guaranteed conservation.

  8. Transportation Energy Data Book, Edition 19; TOPICAL

    International Nuclear Information System (INIS)

    Davis, S.C.

    1999-01-01

    The Transportation Energy Data Book: Edition 19 is a statistical compendium prepared and published by Oak Ridge National Laboratory (ORNL) under contract with the Office of Transportation Technologies in the Department of Energy (DOE). Designed for use as a desk-top reference, the data book represents an assembly and display of statistics and information that characterize transportation activity, and presents data on other factors that influence transportation energy use. The purpose of this document is to present relevant statistical data in the form of tables and graphs. The latest editions of the Data Book are available to a larger audience via the Internet (http://www-cta.ornl.gov/data/tedb.htm)

  9. Effect of paraelectrode processes on contraction of space charge in periodic-pulse lasers

    Science.gov (United States)

    Arytyunyan, R. V.; Baranov, V. Yu.; Borisov, V. M.; Vinokhodov, A. Yu.; Kiryukhin, Yu. B.

    1986-05-01

    A characteristic feature of periodic-pulse electric-discharge CO2-lasers and excimer lasers is contraction of the space charge as the pulse repetition rate increases. The emission energy per pulse decreases as a consequence, with the average laser power first ceasing to increase linearly beyond a certain corner repetition rate and then decreasing beyond a certain critical repetition rate. A study of this phenomenon was made, for the purpose of separating the effect of paracathode processes from the effect of gas dynamics and then evaluating the effect of the former alone. Paraelectrode perturbations were simulated by focusing the radiation from the an XeCl-laser on the cathode surface in an atmosphere of nonabsorbing gases. Laser pulses of up to approximately 0.5 J energy and of approximately 50 ns duration were focused within a spot of 1 mm(2) area on a cathode inside a discharge chamber, with the power density of incident radiation regulated by means of an attenuator. A space charge within a volume of 2.5x4.5x9 cm(3) was generated between this specially shaped cathode and a mesh anode with an approximately 50% optical transmission coefficient. The space charge in helium and in neon was photographed, and the time lag of a discharge pulse behind a contracting laser pulse was measured as a function of the laser pulse energy for these two gases, as well as for a He+C12 gas mixture. The general trend was found to be the same in each case, the time lag increasing with increasing energy first at a slower rate up to a critical energy level and then faster. It has been established that plasma does not build up on the cathode before the laser pulse energy reaches 30 mJ (for a 3 mm(2) surface area), while plasma glow begins as the laser pulse energy reaches 150 mJ. A contracted channel begins to form within the laser-cathode interaction space, with an attendant fast increase of the time lag owing to evaporation of the cathode metal.

  10. 48 CFR 970.2303-3 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... facility, the clause at 48 CFR 970.5223-1, Integration of Environment, Safety and Health into Work Planning..., Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2303-3 Contract clauses. (a) When work under management and operating contracts and subcontracts thereunder is to be performed at a...

  11. Accelerating energy efficiency improvement in the public sector, using Energy Performance Contracting - a workshop on Nordic experiences and needs for improvements

    Energy Technology Data Exchange (ETDEWEB)

    Gottberg, Annika; Gode, Jenny; Axelsson, Ulrik

    2009-08-15

    This report provides documentation on a workshop on experiences of Energy Performance Contracting (EPC) in the Nordic countries, aiming to identify strengths, weaknesses and needs for improvements. The results of surveys undertaken to inform presentations and discussions at the workshop are reported. Furthermore, the outcomes of the discussions during the workshop and resulting recommend actions for different actors to further and accelerate the use of EPC in the public sector are reported. Target groups for this documentation are existing and potential EPC customers, providers and policy-makers

  12. Natural limits of electroweak model as contraction of its gauge group

    International Nuclear Information System (INIS)

    Gromov, N A

    2015-01-01

    The low and higher energy limits of the electroweak model are obtained from the first principles of gauge theory. Both limits are given by the same contraction of the gauge group, but for the different consistent rescalings of the field space. Mathematical contraction parameter in both cases is interpreted as energy. Very weak neutrino–matter interactions are explained by zero tending contraction parameter, which depends on neutrino energy. The second consistent rescaling corresponds to the higher energy limit of the electroweak model. At the infinite energy all particles lose mass, electroweak interactions become long-range and are mediated by neutral currents. The limit model represents the development of the early Universe from the big bang up to the end of the first second. (paper)

  13. Getting added value from the supply contract

    International Nuclear Information System (INIS)

    Heslop, Peter

    1999-01-01

    The linking of energy saving measures with the competitive supply of energy is examined, and the impact of digital metering on the electricity market, the roles of energy surveys and monitoring and targeting, and the unwillingness to invest in energy efficiency are discussed. Combined heat and power projects, and energy supply contracts are considered. (uk)

  14. Hybrid renewable energy support policy in the power sector: The contracts for difference and capacity market case study

    International Nuclear Information System (INIS)

    Onifade, Temitope Tunbi

    2016-01-01

    The article employs qualitative methods in contextualizing and conceptualizing the hybrid renewable energy support policy. It claims that hybrid policies may combine distinct mechanisms to drive desirable objectives better than traditional policies. A policy cycle helps to frame the United Kingdom's Contracts for Difference and Capacity Market (CFD & CM) scheme as a case study. The CFD & CM policy emerged to address environmental and energy challenges through the deployment of renewable energy (RE) in a low-carbon economy, employing liberalization: Environmental protection is foremost in this scheme. The policy combines and improves on the elements of feed-in tariff (FIT) and quota obligation (QO), and strives to solve the problems of these traditional policies. It addresses regulatory uncertainty under FIT by employing private law mechanics to guarantee above-loss reward for low carbon generation, and addresses market uncertainty under QO by incentivizing the capacity to supply future low carbon energy based on projected demand, hence creating a predictable and stable market. It also accommodates other important commitments. Overall, the CFD & CM scheme is a hybrid policy that engages the energy market mainly for advancing the end goal of environmental protection. To thrive however, it needs to meet private sector interests substantially. - Highlights: •The hybrid support policy combines traditional support systems. •Hybrid policies may drive objectives better than traditional policies. •The UK's contract for difference and capacity market system is a hybrid policy. •Environmental protection is foremost in the UK's hybrid policy. •To thrive, the UK's hybrid policy should address private sector interests.

  15. Strategic Inventories in Vertical Contracts

    OpenAIRE

    Krishnan Anand; Ravi Anupindi; Yehuda Bassok

    2008-01-01

    Classical reasons for carrying inventory include fixed (nonlinear) production or procurement costs, lead times, nonstationary or uncertain supply/demand, and capacity constraints. The last decade has seen active research in supply chain coordination focusing on the role of incentive contracts to achieve first-best levels of inventory. An extensive literature in industrial organization that studies incentives for vertical controls largely ignores the effect of inventories. Does the ability to ...

  16. Review on Overseas Contracts of a Nuclear Research Institute in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Myung Ho; Lee, Eui Jin [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2010-10-15

    Since its establishment, Korea Atomic Energy Research Institute (KAERI) has made various contracts in research, design, engineering and consultation with a lot of foreign counterparts all over the world, including international organizations. As one of the global nuclear energy research leaders, KAERI can make a large scale contract because it has already procured a turnkey EPC (Engineering, Procurement, Construction) contract for a research and training reactor in the spring of 2010 by forming a consortium with a construction and engineering company. A contract in nuclear business industries is to be made under the limited control of regulatory authorities because the contractors must ensure nuclear safety and follow the international nuclear non-proliferation guidelines to secure the peaceful use of nuclear energy at an international level. The export and import of strategic technologies, products or materials (including nuclear materials) must be directly controlled by the authorities in accordance with the applicable law. In 2009, KAERI organized a new team to manage the overseas contracts and to make the limited control reflected in the contract documentation. In large scale project contracts, more attention shall be given to the contracts to prevent claims and also to the consideration of the regulatory requirements. In this context, the nature of the past KAERI contracts was reviewed. The conditions of several recent KAERI contracts were also individually reviewed based on the FIDIC (Federation Internationale des Ingenieurs-Conseils) model service agreement, which is generally accepted by service contractors. Ways to increase the quality of future contracts and to improve the standard model agreement which is used to prepare the draft contract were also considered

  17. Review on Overseas Contracts of a Nuclear Research Institute in Korea

    International Nuclear Information System (INIS)

    Lee, Myung Ho; Lee, Eui Jin

    2010-01-01

    Since its establishment, Korea Atomic Energy Research Institute (KAERI) has made various contracts in research, design, engineering and consultation with a lot of foreign counterparts all over the world, including international organizations. As one of the global nuclear energy research leaders, KAERI can make a large scale contract because it has already procured a turnkey EPC (Engineering, Procurement, Construction) contract for a research and training reactor in the spring of 2010 by forming a consortium with a construction and engineering company. A contract in nuclear business industries is to be made under the limited control of regulatory authorities because the contractors must ensure nuclear safety and follow the international nuclear non-proliferation guidelines to secure the peaceful use of nuclear energy at an international level. The export and import of strategic technologies, products or materials (including nuclear materials) must be directly controlled by the authorities in accordance with the applicable law. In 2009, KAERI organized a new team to manage the overseas contracts and to make the limited control reflected in the contract documentation. In large scale project contracts, more attention shall be given to the contracts to prevent claims and also to the consideration of the regulatory requirements. In this context, the nature of the past KAERI contracts was reviewed. The conditions of several recent KAERI contracts were also individually reviewed based on the FIDIC (Federation Internationale des Ingenieurs-Conseils) model service agreement, which is generally accepted by service contractors. Ways to increase the quality of future contracts and to improve the standard model agreement which is used to prepare the draft contract were also considered

  18. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  19. DOE turns down all bids for Elk Hills crude

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that the U.S. Department of Energy has rejected all bids submitted in the Mar. 5 semiannual sale of crude oil from Elk Hills Naval Petroleum Reserve (NPR-1) in California. DOE the all 19 bids for the 53,740 b/d of crude were too low. The bids ranged from $11.71 to $14.06/bbl, with the top bids for the highest quality Stevens zone crude averaging $13.25/bbl. California oil companies the they bid what the market would bear, explaining a surplus of Alaskan crude on the West Coast has driven down the price of local crudes, notably heavy crudes. DOE will extend the current oil purchase contracts through April while it issues a new request for bids. It planned to issue the solicitation Mar. 23 and receive bids Apr. 15

  20. Energy strategy would slow coal's growth, says DOE

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    The National Energy Strategy (NES) recently announced by the Bush Administration would slow the growth in use of coal by hundreds of millions of tons of coal by hundreds of millions of tons after 2000, according to the Department of Energy's (DOE) own figures. If today's policies are continued, coal consumption will nearly triple by 2030. Current annual consumption of more than 900 million tons (19 quadrillion Btus) would rise to 1,550 million tons in 2010 and to nearly 2,600 million tons by 2030. Coal's share of electricity generation, now about 55%, would grow to 75% by 2030 under the current policy base assumptions of the DOE. The NES, however, projects that surge of nuclear power plant construction will stem the growth of coal use. The strategy would still increase coal use, from 19 quadrillion Btus today to about 28 quads in 2010, but to only 32 quads by 2030. By 2030, coal would account for less than 50% of electricity generation under the NES. Total clean coal technologies capacity is substantially lower under the NES scenario case than under the clean coal actions alone. The strategy also contains good news for the coal industry in the short run. It holds out two main goals for coal policy: maintaining coal's competitiveness while meeting environmental, health and safety requirements; and creating a favorable export climate for US coal and coal technology

  1. Some alternatives for DOE acceptance and storage of spent fuel in 1998 and 1999

    International Nuclear Information System (INIS)

    Wood, T.W.; Smith, R.I.; Johnson, E.R.; McLeod, N.B.

    1990-05-01

    Under the Standard Contract for Disposal of Spent Fuel and High-Level Waste (10 CFR 961), the Department of Energy (DOE) will accept spent fuel for disposal from current owners. Current projections (DOE 1989a) suggest 2010 as the earliest date for the availability of a geologic repository for the disposal of spent fuel. In addition, DOE (1989a) suggests that a monitored retrievable storage (MRS) facility with full hot cell capabilities could not be in full service until 2000. As a result, there is a period of about two years wherein DOE is expected to receive and store spent fuel, but during which none of the proposed Federal Waste Management System (FWMS) facilities would be fully functional. During early 1990, a study was initiated to identify, describe, and provide a preliminary evaluation of some short-term alternatives that would permit DOE to accept and store spent fuel during this period. This paper summarizes some key results of this study. 4 refs., 1 fig., 4 tabs

  2. Implementing Relative Ranking Evaluation Framework at Department of Energy (DOE) installations

    International Nuclear Information System (INIS)

    Sharma, S.K.; Williamson, D.; Treichel, L.C.; James, L.M.

    1996-01-01

    The US Department of Energy (DOE) Office of Environmental Restoration (EM-40) has developed the Relative Ranking Evaluation Framework (RREF) to help categorize release sites, facilities and buildings requiring restoration or decommissioning. Based on this framework, a computer tool, the Relative Rank Evaluation Program (RREP) has been developed to evaluate release sites, facilities and buildings, and to manage information pertaining to relative ranking evaluations. The relative ranking information is being used by both Headquarters and field project managers, and other environmental personnel responsible for planning, executing and evaluation environmental restoration activities at DOE installations. External stakeholders, such as representatives of federal and state regulatory agencies, local governments and communities in the vicinity of current and formerly used DOE installations may use this data to review proposed and planned activities

  3. CONTRACTING AND ERUPTING COMPONENTS OF SIGMOIDAL ACTIVE REGIONS

    International Nuclear Information System (INIS)

    Liu Rui; Wang Yuming; Liu Chang; Wang Haimin; Török, Tibor

    2012-01-01

    It has recently been noted that solar eruptions can be associated with the contraction of coronal loops that are not involved in magnetic reconnection processes. In this paper, we investigate five coronal eruptions originating from four sigmoidal active regions, using high-cadence, high-resolution narrowband EUV images obtained by the Solar Dynamic Observatory (SDO). The magnitudes of the flares associated with the eruptions range from GOES class B to class X. Owing to the high-sensitivity and broad temperature coverage of the Atmospheric Imaging Assembly (AIA) on board SDO, we are able to identify both the contracting and erupting components of the eruptions: the former is observed in cold AIA channels as the contracting coronal loops overlying the elbows of the sigmoid, and the latter is preferentially observed in warm/hot AIA channels as an expanding bubble originating from the center of the sigmoid. The initiation of eruption always precedes the contraction, and in the energetically mild events (B- and C-flares), it also precedes the increase in GOES soft X-ray fluxes. In the more energetic events, the eruption is simultaneous with the impulsive phase of the nonthermal hard X-ray emission. These observations confirm that loop contraction is an integrated process in eruptions with partially opened arcades. The consequence of contraction is a new equilibrium with reduced magnetic energy, as the contracting loops never regain their original positions. The contracting process is a direct consequence of flare energy release, as evidenced by the strong correlation of the maximal contracting speed, and strong anti-correlation of the time delay of contraction relative to expansion, with the peak soft X-ray flux. This is also implied by the relationship between contraction and expansion, i.e., their timing and speed.

  4. High-level waste program integration within the DOE complex

    International Nuclear Information System (INIS)

    Valentine, J.H.; Malone, K.; Schaus, P.S.

    1998-03-01

    Eleven major Department of Energy (DOE) site contractors were chartered by the Assistant Secretary to use a systems engineering approach to develop and evaluate technically defensible cost savings opportunities across the complex. Known as the complex-wide Environmental Management Integration (EMI), this process evaluated all the major DOE waste streams including high level waste (HLW). Across the DOE complex, this waste stream has the highest life cycle cost and is scheduled to take until at least 2035 before all HLW is processed for disposal. Technical contract experts from the four DOE sites that manage high level waste participated in the integration analysis: Hanford, Savannah River Site (SRS), Idaho National Engineering and Environmental Laboratory (INEEL), and West Valley Demonstration Project (WVDP). In addition, subject matter experts from the Yucca Mountain Project and the Tanks Focus Area participated in the analysis. Also, departmental representatives from the US Department of Energy Headquarters (DOE-HQ) monitored the analysis and results. Workouts were held throughout the year to develop recommendations to achieve a complex-wide integrated program. From this effort, the HLW Environmental Management (EM) Team identified a set of programmatic and technical opportunities that could result in potential cost savings and avoidance in excess of $18 billion and an accelerated completion of the HLW mission by seven years. The cost savings, schedule improvements, and volume reduction are attributed to a multifaceted HLW treatment disposal strategy which involves waste pretreatment, standardized waste matrices, risk-based retrieval, early development and deployment of a shipping system for glass canisters, and reasonable, low cost tank closure

  5. Contract Reform Self Assessment Report

    National Research Council Canada - National Science Library

    1997-01-01

    The primary objective of this self assessment is to report on the Department of Energy's progress in implementing the Contract Reform initiative launched in February 1994 and to discuss remaining challenges...

  6. Transitioning from operations to environmental restoration: Startup of the Fernald Environmental Restoration Management Contract

    International Nuclear Information System (INIS)

    Little, C.C.; Kozlowski, D.R.

    1993-10-01

    This paper will present a description of the program undertaken by the Fernald Environmental Restoration Management Contractor (ERMC) to effect a transition from operation of the Fernald site by the past M ampersand O contractor, WEMCO, to DOE's new mission and contractual approach focussed on site remediation. This transition, on a first of its kind contract, represented a significant, proactive approach on the part of DOE to pursue the clean up of its weapon's production facilities in a faster, more cost-effective manner. The paper will discuss the formal transition readiness review process and the lessons teamed by DOE and the contractor during transition. The oral presentation will be shared by both authors with one half of the time allocated to the transition readiness demonstration process and one half to the lessons learned. The objective of having a Department of Energy (DOE) Headquarters representative participate in the transition to the first ERMC was to develop a handbook to assist other sites proceeding with the ERMC concept, such as the Richland Operations Office, and to develop a lessons learned document. Because a lessons learned report is available separately, only those more significant lessons learned are highlighted in this paper

  7. Managing the risks associated with natural gas purchase contracts

    International Nuclear Information System (INIS)

    Brett, T.

    2003-01-01

    This presentation described different styles of gas contracts. When markets opened in 1986, many contracts were between end users and producers, and a few marketers. Typically, contracts were for a fixed price and term. In 1990, when gas futures contracts began trading on NYMEX, contracts began to have floating prices, and prices linked to NYMEX prices. Standard gas contracts were developed in the mid-late 1990s. This paper described the differences between plain retail gas contracts, retail gas contracts between mass marketers and end users, wholesale contracts, contracts between producers and marketers, transportation contracts and domestic contracts. Both contracting parties obtain business and legal advice from consultants and lawyers with knowledge in energy transactions. Master agreement contracts were also described with reference to the Gas EDI contract. Examples of changing regulatory requirements were also outlined along with some traps to avoid. Bundled transportation agreements are standard documents that can be negotiated in special circumstances to charge customers who fail to deliver. They should be considered as tariffs

  8. 48 CFR 952.236 - Construction and architect-engineer contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Construction and architect-engineer contracts. 952.236 Section 952.236 Federal Acquisition Regulations System DEPARTMENT OF ENERGY... Construction and architect-engineer contracts. ...

  9. Final technical report: DOE-High Energy Physics contract with the University of Hawaii

    International Nuclear Information System (INIS)

    1995-01-01

    This report is divided into two sections: (1) experimental program; and (2) theoretical program. In each case the report includes a highly condensed summary of the major developments on various Hawaii projects. The various experimental programs in which Hawaii played a significant role during this period are: (1) neutrino bubble chamber experiments; (2) electron-positron colliding beams; (3) development of silicon particle-position detectors for HEP; (4) proton decay search; (5) high energy gamma-ray astronomy; and (6) DUMAND project. The theoretical programs are: (1) research in neutrino physics; (2) supernova neutrinos; (3) solar neutrinos; (4) atmospheric neutrinos; (5) searching for supersymmetry; (6) Higgs boson searches; (7) simulation of supersymmetry; (8) signals of R-parity violation; (9) leptoquarks, stable heavy particles and other exotica; (10) CP non conservation; (11) neutron electron dipole moment; (12) heavy quark physics; and (13) hadron spectroscopy

  10. List of DOE radioisotope customers with summary of radioisotope shipments, FY 1979

    International Nuclear Information System (INIS)

    Burlison, J.S.

    1980-06-01

    The fifteenth edition of the radioisotope customer list was prepared at the request of the Division of Financial Services, Office of the Assistant Secretary for Environment, Department of Energy (DOE). This document lists DOE's radioisotope production and distribution activities by its facilities at Argonne National Laboratory; Pacific Northwest Laboratory; Brookhaven National Laboratory; Hanford Engineering Development Laboratory; Idaho Operations Office; Los Alamos Scientific Laboratory; Mound Facility; Oak Ridge National Laboratory; Rocky Flats Area Office; Savannah River Laboratory; and UNC Nuclear Industries, Inc. The information is divided into five sections: Isotope suppliers, facility, contracts and isotopes or services supplied; alphabetical list of customers, and isotopes purchased; alphabetical list of isotopes cross-referenced to customer numbers; geographical location of radioisotope customers; and radioisotope sales and transfers-FY 1979

  11. Pacific Northwest Laboratory annual report for 1991 to the DOE Office of Energy Research

    International Nuclear Information System (INIS)

    1992-05-01

    Within the US Department of Energy's (DOE's) Office of Health and Environmental Research (OHER), the atmospheric sciences and carbon dioxide research programs are part of the Environmental Sciences Division (ESD). One of the central missions of the division Is to provide the DOE with scientifically defensible information on the local, regional, and global distributions of energy-related pollutants and their effects on climate. This information is vital to the definition and Implementation of a sound national energy strategy. This volume reports on the progress and status of all OHER atmospheric science and climate research projects at the Pacific Northwest Laboratory (PNL). Research at PNL provides basic scientific underpinnings to DOE's program of global climate research. Research projects within the core carbon dioxide and ocean research programs are now integrated with those in the Atmospheric Radiation Measurements (ARM), the Computer Hardware, Advanced Mathematics and Model Physics (CHAMMP), and quantitative links programs to form DOEs contribution to the US Global Change Research Program. Climate research in the ESD has the common goal of improving our understanding of the physical, chemical, biological, and social processes that influence the Earth system so that national and international policymaking relating to natural and human-induced changes in the Earth system can be given a firm scientific basis. This report describes the progress In FY 1991 in each of these areas

  12. Advanced, High Power, Next Scale, Wave Energy Conversion Device

    Energy Technology Data Exchange (ETDEWEB)

    Mekhiche, Mike [Principal Investigator; Dufera, Hiz [Project Manager; Montagna, Deb [Business Point of Contact

    2012-10-29

    The project conducted under DOE contract DE‐EE0002649 is defined as the Advanced, High Power, Next Scale, Wave Energy Converter. The overall project is split into a seven‐stage, gated development program. The work conducted under the DOE contract is OPT Stage Gate III work and a portion of Stage Gate IV work of the seven stage product development process. The project effort includes Full Concept Design & Prototype Assembly Testing building on our existing PowerBuoy technology to deliver a device with much increased power delivery. Scaling‐up from 150kW to 500kW power generating capacity required changes in the PowerBuoy design that addressed cost reduction and mass manufacturing by implementing a Design for Manufacturing (DFM) approach. The design changes also focused on reducing PowerBuoy Installation, Operation and Maintenance (IO&M) costs which are essential to reducing the overall cost of energy. In this design, changes to the core PowerBuoy technology were implemented to increase capability and reduce both CAPEX and OPEX costs. OPT conceptually envisaged moving from a floating structure to a seabed structure. The design change from a floating structure to seabed structure would provide the implementation of stroke‐ unlimited Power Take‐Off (PTO) which has a potential to provide significant power delivery improvement and transform the wave energy industry if proven feasible.

  13. 78 FR 17653 - Upper Great Plains Wind Energy Draft Programmatic Environmental Impact Statement (DOE/EIS-0408)

    Science.gov (United States)

    2013-03-22

    ... Wildlife Service Upper Great Plains Wind Energy Draft Programmatic Environmental Impact Statement (DOE/EIS... Plains Wind Energy Draft Programmatic Environmental Impact Statement (Draft [[Page 17654

  14. Proposal for the Award of Two Contracts for the Technical Services for Work on Components of CERN Particle Accelerators and High Energy Physics Experiments

    CERN Document Server

    2003-01-01

    This document concerns the award of two contracts for the technical services for work on components of CERN particle accelerators and high energy physics experiments. Following a market survey carried out among 73 firms in fourteen Member States, a call for tenders (IT-3156/SPL) was sent on 4 November 2002 to three consortia in four Member States. By the closing date, CERN had received tenders from the three consortia. The Finance Committee is invited to agree to the negotiation of two contracts with: 1) the consortium SERCO FACILITIES MANAGEMENT (NL) - GERARD PERRIER INDUSTRIE (FR) - INEO ALPES (FR), the lowest bidder, for approximately 55% of the technical services for work on components of CERN particle accelerators and high energy physics experiments, for an initial period of five years and for a total amount not exceeding 37 435 270 euros (54 902 500 Swiss francs), subject to revision for inflation from 1 January 2005. The contract will include options for two one-year extensions beyond the initial five-...

  15. Types of contracts and contracting procedures

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1977-01-01

    Contracting for a nuclear power plant can be carried out in many different ways, from a bilateral agreement between two countries to an international open bidding competition. Also the kind of contracts (turnkey, split-package or multi-contract type) are discussed with their pros and cons as well as the contracting procedures which can be followed to come to the conclusion of a contract. (orig.) [de

  16. A preliminary assessment of the potential for 'team science' in DOE Energy Innovation Hubs and Energy Frontier Research Centers

    International Nuclear Information System (INIS)

    Boardman, Craig; Ponomariov, Branco

    2011-01-01

    President Obama has called for the development of new energy technologies to address our national energy needs and restore US economic competitiveness. In response, the Department of Energy has established new R and D modalities for energy research and development designed to facilitate collaboration across disciplinary, institutional, and sectoral boundaries. In this research note, we provide a preliminary assessment of the potential for essential mechanisms for coordinated problem solving among diverse actors within two new modalities at the DOE: Energy Innovation Hubs and Energy Frontier Research Centers. - Highlights: → Energy Frontier Research Centers may lack the basic mechanisms for coordinating diverse actors. → Divergent goals across diverse actors may hinder coordination in Energy Innovation Hubs. → The implementation of these and similar energy policies require further investigation.

  17. Energy Performance Contracting - success in Austria and Germany - dead end for Europe?

    International Nuclear Information System (INIS)

    Seefeldt, Friedrich

    2003-01-01

    At the beginning of the 21st century, the European market for Energy Performance Contracting (EPC) is extremely diverse. Without a doubt, Germany and Austria are the pioneers, standing out due to their already high market standards and consistent market growth. The market in Germany is characterised by more than 200 EPC-agreements made since the mid-90s - with high-tech individual buildings like hospitals, as well as building 'pools' of up to 100 separate buildings. In Austria, EPC projects have been implemented in approximately 500 buildings during the last four years - with the public building administrations as the driving forces. While EPC has become a standard instrument in facility management in Germany and Austria, in most other European countries the market is still at its very beginning. First, the basic idea and conception of the instrument will be presented in a short introduction, illustrated by concrete project examples with an emphasis on discussing the perspectives from the demand side, especially the public and tertiary sectors. Next, the question centres on how a deliberate energy (efficiency) policy can accelerate the successful market introduction of EPC (role of public building administration as pioneers, support of building owners during project preparation; energy agencies with specific know-how etc.). A last reflection discusses the consequences for a possible directive on Energy Services. In all this, the authors draw continuous attention to the common traits, but also take a look at barriers and success factors. The analysis is based on both authors' broad practical experience in EPC project development and dissemination of best practices

  18. DOE Zero Energy Ready Home Case Study: One Sky Homes — Cottle Zero Net Energy Home, San Jose, CA

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-09-01

    This builder took home the Grand Winner prize in the Custom Builder category in the 2014 Housing Innovation Awards for its high performance building science approach. The builder used insulated concrete form blocks to create the insulated crawlspace foundation for its first DOE Zero Energy Ready Home, the first net zero energy new home certified in the state of California.

  19. High energy physics program at Texas A&M University. Final report, April 1, 1990--March 31, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    The Texas A&M experimental high energy physics program has been supported since its inception by DOE Contract DE-AS05-81ER40039. During that period we established a viable experimental program at a university which before this time had no program in high energy physics. In 1990, the experimental program was augmented with a program in particle theory. In the accompanying final report, we outline the research work accomplished during the final year of this contract and the program being proposed for consideration by the Department of Energy for future grant support. Some of the particular areas covered are: Collider detector at Fermilab program; the TAMU MACRO program; SSC R&D program; SSC experimental program; and theoretical physics program.

  20. The Green Stamp in Power Supply Contracts - A proposal for the Brazilian Electricity Market

    Energy Technology Data Exchange (ETDEWEB)

    Estrocio, Joao Paulo

    2010-09-15

    The insertion of a certification mechanism for discriminatory energy supply contracts aiming to make it possible to contract exclusively clean and renewable energy is presented. With the increasing interest for sustainability and carbon emissions reduction, there's a growing demand for clean energy reflected in people's choices for cleaner products. Electricity in a power grid, however, is result of a set of sources or plants, and its operation or dispatch. A proposal for clean energy contracts is presented, providing the market and the clients with the ability to choose to buy exclusively renewable energy through the grid.

  1. 41 CFR 102-192.30 - What types of mail does this part apply to?

    Science.gov (United States)

    2010-07-01

    ... 192-MAIL MANAGEMENT Introduction to this Part § 102-192.30 What types of mail does this part apply to... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What types of mail does this part apply to? 102-192.30 Section 102-192.30 Public Contracts and Property Management Federal...

  2. Evaluation and compilation of DOE [Department of Energy] waste package test data

    International Nuclear Information System (INIS)

    Interrante, C.; Escalante, E.; Fraker, A.; Plante, E.

    1989-10-01

    This report summarizes evaluations by the National Institute of Standards and Technology (NIST) of Department of Energy (DOE) activities on waste packages designed for containment of radioactive high-level nuclear waste (HLW) for the six month period February 1988 through July 1988. Activities for the DOE Materials Characterization Center are reviewed for the period January 1988 through June 1988. A summary is given of the Yucca Mountain, Nevada disposal site activities. Short discussions relating to the reviewed publications are given and complete reviews and evaluations are included. 20 refs., 1 fig., 1 tab

  3. Does the detection of primordial gravitational waves exclude low energy inflation?

    Directory of Open Access Journals (Sweden)

    Tomohiro Fujita

    2018-03-01

    Full Text Available We show that a detectable tensor-to-scalar ratio (r≥10−3 on the CMB scale can be generated even during extremely low energy inflation which saturates the BBN bound ρinf≈(30MeV4. The source of the gravitational waves is not quantum fluctuations of graviton but those of SU(2 gauge fields, energetically supported by coupled axion fields. The curvature perturbation, the backreaction effect and the validity of perturbative treatment are carefully checked. Our result indicates that measuring r alone does not immediately fix the inflationary energy scale.

  4. 41 CFR 102-192.5 - What does this part cover?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does this part cover? 102-192.5 Section 102-192.5 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS 192-MAIL MANAGEMENT...

  5. Wind Vision: A New Era for Wind Power in the United States (Highlights); U.S. Department of Energy (DOE), NREL (National Renewable Energy Laboratory)

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-01

    This is a four-part Wind Vision project, consisting of Wind Vision Highlights, Executive Summary, a Full Report, and Appendix. The U.S. Department of Energy (DOE) Wind Program, in close cooperation with the wind industry, led a comprehensive analysis to evaluate future pathways for the wind industry. The Wind Vision report updates and expands upon the DOE's 2008 report, 20% Wind Energy by 2030, and defines the societal, environmental, and economic benefits of wind power in a scenario with wind energy supplying 10% of national end-use electricity demand by 2020, 20% by 2030, and 35% by 2050.

  6. DOE-2 basics

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    DOE-2 provides the building design and research communities with an up-to-date, unbiased, well-documented public-domain computer program for building energy analysis. DOE-2 predicts the hourly energy use and energy cost of a building given hourly weather information and a description of the building and its HVAC equipment and utility rate structure. DOE-2 is a portable FORTRAN program that can be used on a large variety of computers, including PC's. Using DOE-2, designers can determine the choice of building parameters that improve energy efficiency while maintaining thermal comfort. The purpose of DOE-2 is to aid in the analysis of energy usage in buildings; it is not intended to be the sole source of information relied upon for the design of buildings. The judgment and experience of the architect/engineer still remain the most important elements of building design.

  7. DOE-2 basics

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    DOE-2 provides the building design and research communities with an up-to-date, unbiased, well-documented public-domain computer program for building energy analysis. DOE-2 predicts the hourly energy use and energy cost of a building given hourly weather information and a description of the building and its HVAC equipment and utility rate structure. DOE-2 is a portable FORTRAN program that can be used on a large variety of computers, including PC`s. Using DOE-2, designers can determine the choice of building parameters that improve energy efficiency while maintaining thermal comfort. The purpose of DOE-2 is to aid in the analysis of energy usage in buildings; it is not intended to be the sole source of information relied upon for the design of buildings. The judgment and experience of the architect/engineer still remain the most important elements of building design.

  8. Building America Energy Renovations. A Business Case for Home Performance Contracting

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Antonopoulos, C. A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sevigny, M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Gilbride, T. L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hefty, M. G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2012-10-01

    This research report gives an overview of the needs and opportunities that exist in the U.S. home performance contracting industry. The report discusses industry trends, market drivers, different business models, and points of entry for existing and new businesses hoping to enter the home performance contracting industry. Case studies of eight companies who successfully entered the industry are provided, including business metrics, start-up costs, and marketing approaches.

  9. Antenna entropy in plant photosystems does not reduce the free energy for primary charge separation.

    Science.gov (United States)

    Jennings, Robert C; Zucchelli, Giuseppe

    2014-12-01

    We have investigated the concept of the so-called "antenna entropy" of higher plant photosystems. Several interesting points emerge: 1. In the case of a photosystemwhich harbours an excited state, the “antenna entropy” is equivalent to the configurational (mixing) entropy of a thermodynamic canonical ensemble. The energy associated with this parameter has been calculated for a hypothetical isoenergetic photosystem, photosystem I and photosystem II, and comes out in the range of 3.5 - 8% of the photon energy considering 680 nm. 2. The “antenna entropy” seems to be a rather unique thermodynamic phenomenon, in as much as it does not modify the free energy available for primary photochemistry, as has been previously suggested. 3. It is underlined that this configurational (mixing) entropy, unlike heat dispersal in a thermal system, does not involve energy dilution. This points out an important difference between thermal and electronic energy dispersal. Copyright © 2014 Elsevier B.V. All rights reserved.

  10. Natural gas cost for evaluating energy resource opportunities at Fort Stewart

    Energy Technology Data Exchange (ETDEWEB)

    Stucky, D.J.; Shankle, S.A.

    1993-01-01

    Ft. Stewart, a United States Army Forces Command (FORSCOM) installation located near Hinesville, Georgia, is currently undergoing an evaluation of its energy usage, which is being performed by Pacific Northwest Laboratory. In order to examine the energy resource opportunities (EROs) at Ft. Stewart, marginal fuel costs must be calculated. The marginal, or avoided, cost of gas service is used in conjunction with the estimated energy savings of an ERO to calculate the dollar value of those savings. In the case of natural gas, the costing becomes more complicated due to the installation of a propane-air mixing station. The propane-air station is being built under a shared energy savings (SES) contract. The building of a propane-air station allows Ft. Stewart to purchase natural gas from their local utility at an interruptible rate, which is lower than the rate for contracting natural gas on a firm basis. The propane-air station will also provide Ft. Stewart with fuel in the event that the natural gas supply is curtailed. While the propane-air station does not affect the actual cost of natural gas, it does affect the cost of services provided by gas. Because the propane-air station and the SES contract affect the cost of gas service, they must be included in the analysis. Our analysis indicates a marginal cost of gas service of 30.0 cents per therm, assuming a total propane usage by the mixing station of 42,278 gallons (38,600 therms) annually. Because the amount of propane that may be required in the event of a curtailment is small relative to the total service requirement, variations in the actual amount should not significantly affect the cost per therm.

  11. Natural gas cost for evaluating energy resource opportunities at Fort Stewart

    International Nuclear Information System (INIS)

    Stucky, D.J.; Shankle, S.A.

    1993-01-01

    Ft. Stewart, a United States Army Forces Command (FORSCOM) installation located near Hinesville, Georgia, is currently undergoing an evaluation of its energy usage, which is being performed by Pacific Northwest Laboratory. In order to examine the energy resource opportunities (EROs) at Ft. Stewart, marginal fuel costs must be calculated. The marginal, or avoided, cost of gas service is used in conjunction with the estimated energy savings of an ERO to calculate the dollar value of those savings. In the case of natural gas, the costing becomes more complicated due to the installation of a propane-air mixing station. The propane-air station is being built under a shared energy savings (SES) contract. The building of a propane-air station allows Ft. Stewart to purchase natural gas from their local utility at an interruptible rate, which is lower than the rate for contracting natural gas on a firm basis. The propane-air station will also provide Ft. Stewart with fuel in the event that the natural gas supply is curtailed. While the propane-air station does not affect the actual cost of natural gas, it does affect the cost of services provided by gas. Because the propane-air station and the SES contract affect the cost of gas service, they must be included in the analysis. Our analysis indicates a marginal cost of gas service of 30.0 cents per therm, assuming a total propane usage by the mixing station of 42,278 gallons (38,600 therms) annually. Because the amount of propane that may be required in the event of a curtailment is small relative to the total service requirement, variations in the actual amount should not significantly affect the cost per therm

  12. The Role of International Investment Law in Renewable Energy Investment; focus on Build Operate and Transfer (BOT) Contracts

    OpenAIRE

    Adetiloye, Idowu Adejoke

    2014-01-01

    Renewable energy is one of the ways of reducing greenhouse gas emission. There is need for more investment in this sector. However, lack of stable regulatory framework and change in policy makes it unattractive to investors. International investment laws through its protections in investment agreement can help to mitigate risks considered by investors especially those with Build, Operate and Transfer (BOT) type of contracts.

  13. HIA 2016 DOE Zero Energy Ready Home Case Study: Imery & Co, High-performance Bungalow, Roswell, GA

    Energy Technology Data Exchange (ETDEWEB)

    Pacific Northwest National Laboratory

    2016-09-01

    Case study of a DOE 2016 Housing Innovation Award winning custom for buyer home in the mixed-humid climate that met the DOE Zero Energy Ready Home criteria and achieved a HERS 41 without PV or HERS 6 with PV.

  14. DOE Zero Energy Ready Home Case Study: Amaris Homes, Afton Model

    Energy Technology Data Exchange (ETDEWEB)

    Pacific Northwest National Laboratory

    2017-09-01

    Amaris Homes built this 3,734-ft2 home in Afton, Minnesota, to the performance criteria of the DOE Zero Energy Ready Home (ZERH) program. A high-efficiency gas boiler provides hot water for the zoned radiant floor system as well as for faucets and showers. A high-efficiency heat pump provides zoned cooling.

  15. Spatial interaction between tissue pressure and skeletal muscle perfusion during contraction.

    Science.gov (United States)

    van Donkelaar, C C; Huyghe, J M; Vankan, W J; Drost, M R

    2001-05-01

    The vascular waterfall theory attributes decreased muscle perfusion during contraction to increased intramuscular pressure (P(IM)) and concomitant increase in venous resistance. Although P(IM) is distributed during contractions, this theory does not account for heterogeneity. This study hypothesises that pressure heterogeneity could affect the interaction between P(IM) rise and perfusion. Regional tissue perfusion during submaximum (100kPa) tetanic contraction is studied, using a finite element model of perfused contracting skeletal muscle. Capillary flow in muscles with one proximal artery and vein (SIM(1)) and with an additional distal artery and vein (SIM(2)) is compared. Blood flow and pressures at rest and P(IM) during contraction ( approximately 25kPa maximally) are similar between simulations, but capillary flow and venous pressure differ. In SIM(2), venous pressure and capillary flow correspond to P(IM) distribution, whereas capillary flow in SIM(1) is less than 10% of flow in SIM(2), in the muscle half without draining vein. This difference is caused by a high central P(IM), followed by central venous pressure rise, in agreement with the waterfall theory. The high central pressure (SIM(1)), obstructs outflow from the distal veins. Distal venous pressure rises until central blood pressure is reached, although local P(IM) is low. Adding a distal vein (SIM(2)) restores the perfusion. It is concluded that regional effects contribute to the interaction between P(IM) and perfusion during contraction. Unlike stated by the vascular waterfall theory, venous pressure may locally exceed P(IM). Although this can be explained by the principles of this theory, the theory does not include this phenomenon as such.

  16. University contracts summary book

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-08-01

    The principal objectives of the Fossil Energy Program are to seek new ideas, new data, fundamental knowledge that will support the ongoing programs, and new processes to better utilize the nation's fossil energy resources with greater efficiency and environmental acceptability. Toward this end, the Department of Energy supports research projects conducted by universities and colleges to: Ensure a foundation for innovative technology through the use of the capabilities and talents in our academic institutions; provide an effective, two-way channel of communication between the Department of Energy and the academic community; and ensure that trained technical manpower is developed to carry out basic and applied research in support of DOE's mission. Fossil Energy's university activities emphasize the type of research that universities can do best - research to explore the potential of novel process concepts, develop innovative methods and materials for improving existing processes, and obtain fundamental information on the structure of coal and mechanisms of reactions of coal, shale oil, and other fossil energy sources. University programs are managed by different Fossil Energy technical groups; the individual projects are described in greater detail in this book. It is clear that a number of research areas related to the DOE Fossil Energy Program have been appropriate for university involvement, and that, with support from DOE, university scientific and technical expertise can be expected to continue to play a significant role in the advancement of fossil energy technology in the years to come.

  17. Synthesis of the objectives contract 2006-2010 between the State and the IFP. Innovate for a controlled energy transition

    International Nuclear Information System (INIS)

    2006-01-01

    The IFP, French Institute of Petroleum, is a public organization of research and formation at the service of the energy, the transport and the environment. It assures the technology transfer between fundamental research, applied research and the industrial development. The contract for 2006-2010 presents three major structural evolutions: the increase development of the new technologies of the energy; a new equilibrium in favor of the downstream researches and more particularly the transports, the increase of the industry competitiveness in the hydrocarbons sector and the automobiles. (A.L.B.)

  18. Pacific Northwest Laboratory annual report for 1992 to the DOE Office of Energy Research. Part 3, Atmospheric and climate research

    Energy Technology Data Exchange (ETDEWEB)

    Schrempf, R.E. [ed.

    1993-04-01

    Within the US Department of Energy`s (DOE`s) Office of Health and Environmental Research (OHER), the atmospheric sciences and carbon dioxide research programs are part of the Environmental Sciences Division (ESD). One of the central missions of the division is to provide the DOE with scientifically defensible information on the local, regional, and global distributions of energy-related pollutants and their effects on climate. This information is vital to the definition and implementation of a sound national energy strategy. This volume reports on the progress and status of all OHER atmospheric science and climate research projects at the Pacific Northwest Laboratory (PNL). PNL has had a long history of technical leadership in the atmospheric sciences research programs within OHER. Within the ESD, the Atmospheric Chemistry Program (ACP) continues DOE`s long-term commitment to study the continental and oceanic fates of energy-related air pollutants. Research through direct measurement, numerical modeling, and laboratory studies in the ACP emphasizes the long-range transport, chemical transformation, and removal of emitted pollutants, oxidant species, nitrogen-reservoir species, and aerosols. The Atmospheric Studies in Complex Terrain (ASCOT) program continues to apply basic research on density-driven circulations and on turbulent mixing and dispersion in the atmospheric boundary layer to the micro- to mesoscale meteorological processes that affect air-surface exchange and to emergency preparedness at DOE and other facilities. Research at PNL provides basic scientific underpinnings to DOE`s program of global climate research. Research projects within the core carbon dioxide and ocean research programs are now integrated with those in the Atmospheric Radiation Measurements (ARM), the Computer Hardware, Advanced Mathematics and Model Physics (CHAMMP), and Quantitative Links programs to form DOE`s contribution to the US Global Change Research Program.

  19. Managing the relational character of public-private partnership contracts

    Directory of Open Access Journals (Sweden)

    Cvetković Predrag

    2015-01-01

    Full Text Available A public-private partnership contract has the character of a relational contract. Relational contracts are incomplete agreements governing transactions where the contracting parties have mutually agreed that it is impossible or economically inefficient to contractually define ex ante possible difficulties and contingencies in the contract implementation, nor the difficulties and contingencies underlying the ex post control of contract performance by a third entity (court or arbitration. Considering the methodology of managing relational contracts, it is essential that the theory of relational contracts does not advocate for the establishment of relational contracts as a separate category of contracts, with specifically designated contractual instruments. This theory defines the relational contract as a category which legitimizes 'the relational mode' of a particular contract. The methodology of relational contracts is important for contracts on public-private partnership as it ensures that the contractual relationship is aligned with the changes in the immediate environment where the PPP contract operates. The aforementioned alignment has two aspects. The first one is the ex ante aspect of the alignment which is primarily aimed at preventing the detrimental effect of such alignment to the public partner's interests. Therefore, the intent to prevent such an effect shall be taken into account when defining the criteria for the selection of the most favorable private partner and the best offer. At the same time, it is essential to establish verifiable standards for measuring the private partner performance in the phase of contract implementation. For this goal to be achieved, it is crucial to specify the subject matter of the private partner's obligations, to establish the priority rank of PPP project objectives, to elaborate on the specific requirements governing the eligibility of private partners to participate in the bidding process, to specify

  20. Retrospective Benefit-Cost Evaluation of U.S. DOE Wind Energy R&D Program: Impact of Selected Energy Technology Investments

    Energy Technology Data Exchange (ETDEWEB)

    Pelsoci, Thomas M. [Delta Research Co., Evanston, IL (United States)

    2010-06-01

    This benefit-cost analysis focuses on the DOE Wind Energy Program's public sector R&D investments and returns. The analysis accounts for the program's additionality – that is, comparing what has happened as a result of the program to what would have happened without it. The analysis does not address the return on the investments of private companies ("private returns"). Public returns on the program's investments from 1976 to 2008 are identified and analyzed using retrospective analysis.

  1. 5 CFR 591.220 - How does OPM calculate energy utility cost indexes?

    Science.gov (United States)

    2010-01-01

    ... cost indexes? 591.220 Section 591.220 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS ALLOWANCES AND DIFFERENTIALS Cost-of-Living Allowance and Post Differential-Nonforeign Areas Cost-Of-Living Allowances § 591.220 How does OPM calculate energy utility cost indexes? (a) OPM...

  2. Knockout of the predominant conventional PKC isoform, PKCalpha, in mouse skeletal muscle does not affect contraction-stimulated glucose uptake

    DEFF Research Database (Denmark)

    Jensen, Thomas E; Maarbjerg, Stine J; Rose, Adam J

    2009-01-01

    Conventional (c) protein kinase C (PKC) activity has been shown to increase with skeletal muscle contraction, and numerous studies using primarily pharmacological inhibitors have implicated cPKCs in contraction-stimulated glucose uptake. Here, to confirm that cPKC activity is required for contrac...... working on other parts of contraction-induced signaling or the remaining cPKC isoforms are sufficient for stimulating glucose uptake during contractions.......Conventional (c) protein kinase C (PKC) activity has been shown to increase with skeletal muscle contraction, and numerous studies using primarily pharmacological inhibitors have implicated cPKCs in contraction-stimulated glucose uptake. Here, to confirm that cPKC activity is required...... for contraction-stimulated glucose uptake in mouse muscles, contraction-stimulated glucose uptake ex vivo was first evaluated in the presence of three commonly used cPKC inhibitors (calphostin C, Gö-6976, and Gö-6983) in incubated mouse soleus and extensor digitorum longus (EDL) muscles. All potently inhibited...

  3. Direct Drive Wave Energy Buoy

    Energy Technology Data Exchange (ETDEWEB)

    Rhinefrank, Kenneth [Columbia Power Technologies, Inc., Charlottesville, VA (United States); Lamb, Bradford [Columbia Power Technologies, Inc., Charlottesville, VA (United States); Prudell, Joseph [Columbia Power Technologies, Inc., Charlottesville, VA (United States); Hammagren, Erik [Columbia Power Technologies, Inc., Charlottesville, VA (United States); Lenee-Bluhm, Pukha [Columbia Power Technologies, Inc., Charlottesville, VA (United States)

    2016-08-22

    This Project aims to satisfy objectives of the DOE’s Water Power Program by completing a system detailed design (SDD) and other important activities in the first phase of a utility-scale grid-connected ocean wave energy demonstration. In early 2012, Columbia Power (CPwr) had determined that further cost and performance optimization was necessary in order to commercialize its StingRAY wave energy converter (WEC). CPwr’s progress toward commercialization, and the requisite technology development path, were focused on transitioning toward a commercial-scale demonstration. This path required significant investment to be successful, and the justification for this investment required improved annual energy production (AEP) and lower capital costs. Engineering solutions were developed to address these technical and cost challenges, incorporated into a proposal to the US Department of Energy (DOE), and then adapted to form the technical content and statement of project objectives of the resulting Project (DE-EE0005930). Through Project cost-sharing and technical collaboration between DOE and CPwr, and technical collaboration with Oregon State University (OSU), National Renewable Energy Lab (NREL) and other Project partners, we have demonstrated experimentally that these conceptual improvements have merit and made significant progress towards a certified WEC system design at a selected and contracted deployment site at the Wave Energy Test Site (WETS) at the Marine Corps Base in Oahu, HI (MCBH).

  4. 41 CFR 105-74.100 - What does this part do?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does this part do? 105-74.100 Section 105-74.100 Public Contracts and Property Management Federal Property Management... Administration 74-GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Purpose and Coverage...

  5. Implications of the parol evidence rule on the interpretation and drafting of contracts in South Africa

    OpenAIRE

    2013-01-01

    LL.M. (Law of Contract) The parol evidence rule encompasses those rules that regulate the admissibility of extrinsic evidence. The parol evidence rule only comes into play when the court has to interpret a written contract and one of the parties argue that the contract or any specific clause does not reflect the common intention between the parties. The court will then follow a two prong approach in interpreting the contract. The court will firstly utilise the rules of interpretation, incl...

  6. Contract network in a balkanized grid

    International Nuclear Information System (INIS)

    Parkinson, T.W.

    1992-01-01

    Competition in electricity generation depends critically on access to transmission service at nondiscriminatory prices. Current access and pricing policies in the U.S. do not offer prospective private generators any guarantee of such access. Most proposals for reform, while improvements over current policies, attempt to provide for open access without addressing the underlying problems associated with loop flow and constraints in transmission networks. This paper identifies key design objectives for transmission access and pricing policies and cites critical weakness in one example reform proposal. As alternative proposal, based on contract networks, does address the underlying pricing problems. This paper shows that policies based on contract networks would meet the required objectives and could be feasibly implemented even in the Balkanized grid of U.S. investor-owned utilities. 10 refs

  7. National procurement of private-sector treatment for U.S. Department of Energy mixed low-level wastes

    International Nuclear Information System (INIS)

    Berry, J.B.; Jones, D.W.; Seeker, W.R.; Alex, L.J.

    1995-01-01

    The cost of bringing DOE into compliance with the Federal Facilities Compliance Act may be dramatically reduced if the private sector treats DOE mixed low level waste. If the DOE clearly defines this market by using national procurement contracts, the private sector will be able to decide if investing in DOE waste treatment contracts is good business. DOE can structure the mixed waste treatment market to influence the profitability of the contracts and to influence the quality of private sector responses. National procurement contracts will incorporate advice from the private sector so that issues of concern to industry are adequately incorporated

  8. National procurement of private-sector treatment for U.S. Department of Energy mixed low-level wastes

    Energy Technology Data Exchange (ETDEWEB)

    Berry, J.B.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Seeker, W.R. [Energy and Environmental Research Corp., Irvine, CA (United States); Alex, L.J. [Committee for Environmental Management, Washington (United States)

    1995-12-31

    The cost of bringing DOE into compliance with the Federal Facilities Compliance Act may be dramatically reduced if the private sector treats DOE mixed low level waste. If the DOE clearly defines this market by using national procurement contracts, the private sector will be able to decide if investing in DOE waste treatment contracts is good business. DOE can structure the mixed waste treatment market to influence the profitability of the contracts and to influence the quality of private sector responses. National procurement contracts will incorporate advice from the private sector so that issues of concern to industry are adequately incorporated.

  9. DOE New Technology: Sharing New Frontiers, April 1, 1993--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Tamura, A.T.; Henline, D.M. [eds.

    1993-12-01

    The purpose of DOE New Technology is to provide information on how to access specific technologies developed through research sponsored by DOE and performed by DOE laboratories or by DOE-contracted researchers. This document describes technologies identified as having potential for commercial applications in addition to a catalog of current patent applications and patents available for licensing from DOE and DOE contractors.

  10. Pacific Northwest Laboratory annual report for 1993 to the DOE Office of Energy Research. Part 3: Atmospheric and climate research

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The US Department of Energy`s (DOE`s) Office of Health and Environmental Research (OHER) atmospheric sciences and carbon dioxide research programs provide the DOE with scientifically defensible information on the local, regional, and global distributions of energy-related pollutants and their effects on climate. PNL has had a long history of technical leadership in the atmospheric sciences research programs within OHER. Within the Environmental Sciences Division of OHER, the Atmospheric Chemistry Program continues DOE`s long-term commitment to understanding the local, regional, and global effects of energy-related air pollutants. Research through direct measurement, numerical modeling, and analytical studies in the Atmospheric Chemistry Program emphasizes the long-range transport, chemical transformation, and removal of emitted pollutants, photochemically produced oxidant species, nitrogen-reservoir species, and aerosols. The atmospheric studies in Complex Terrain Program applies basic research on atmospheric boundary layer structure and evolution over inhomogeneous terrain to DOE`s site-specific and generic mission needs in site safety, air quality, and climate change. Research at PNL provides basic scientific underpinnings to DOE`s program of global climate research. Research projects within the core carbon dioxide and ocean research programs are now integrated with those in the Atmospheric Radiation Measurements, the Computer Hardware, Advanced Mathematics and Model Physics, and Quantitative Links program to form DOE`s contribution to the US Global Change Research Program. The description of ongoing atmospheric and climate research at PNL is organized in two broad research areas: atmospheric research; and climate research. This report describes the progress in fiscal year 1993 in each of these areas. Individual papers have been processed separately for inclusion in the appropriate data bases.

  11. Industry Stakeholder Recommendations for DOE's RD&D for Increasing Energy Efficiency in Existing Homes

    Energy Technology Data Exchange (ETDEWEB)

    Plympton, P.; Dagher, L.; Zwack, B.

    2007-06-01

    This technical report documents feedback for Industry Stakeholders on the direction of future U.S. Department of Energy (DOE) research and development in the area of improving energy efficiency in existing residential buildings.

  12. THE MODIFICATION OF THE INDIVIDUAL EMPLOYMENT CONTRACT ASSUMING UNPREDICTABILITY

    Directory of Open Access Journals (Sweden)

    Ana Vidat

    2012-11-01

    Full Text Available Adapting a gainful occupation to technological or economical development may require the amendment of individual labor contract under which the activity is performed, taking into account the intrinsic dynamics of employment. If the parties, by agreement, determine the content of the individual labor contract, all in agreement, may agree at any time to amend it according to art. 41 para. 1 of the Labour Code. And trough the provisions of civil law – common law for the employment law – are established legal the review of the effects of the legal actdue because of the breakage contractual balance due to change in the circumstances envisaged by the parties in the moment of conclusion of the legal act (the so-called theory of unpredictability, rebus sic stantibus – exception to the principle "pacta sunt servanda". Recourse to the legal document review because its effects are other than the parties agreed to establish and be binding in the moment of conclusion of that agreement. In the present paper we will refer to administrative contracts, given the subject of this paper – namely that the common law for individual employment contract is the civil law rules applicable to civil contracts. So in this paper does not refer to former commercial contracts, since the new Civil Code was achieved unification of private law matter – giving up the commercial contracts.

  13. Review of power quality applications of energy storage systems

    Energy Technology Data Exchange (ETDEWEB)

    Swaminathan, S.; Sen, R.K. [Sentech, Inc., Bethesda, MD (United States)

    1997-05-01

    Under the sponsorship of the US Department of Energy (DOE) Office of Utility Technologies, the Energy Storage Systems Analysis and Development Department at Sandia National Laboratories contracted Sentech, Inc., to assess the impact of power quality problems on the electricity supply system. This report contains the results of several studies that have identified the cost of power quality events for electricity users and providers. The large annual cost of poor power quality represents a national inefficiency and is reflected in the cost of goods sold, reducing US competitiveness. The Energy Storage Systems (ESS) Program takes the position that mitigation merits the attention of not only the DOE but affected industries as well as businesses capable of assisting in developing solutions to these problems. This study represents the preliminary stages of an overall strategy by the ESS Program to understand the magnitude of these problems so as to begin the process of engaging industry partners in developing solutions.

  14. Primer: The DOE Wind Energy Program's Approach to Calculating Cost of Energy: July 9, 2005 - July 8, 2006

    Energy Technology Data Exchange (ETDEWEB)

    George, K.; Schweizer, T.

    2008-01-01

    This report details the methodology used by DOE to calculate levelized cost of wind energy and demonstrates the variation in COE estimates due to different financing assumptions independent of wind generation technology.

  15. EUROFAB: fabrication of four MOX lead tests assemblies for the US DOE

    International Nuclear Information System (INIS)

    Jean-Pierre Bariteau

    2006-01-01

    In a multilateral agreement, the United States (US) and the Russian Federation agreed to reduce their respective weapons stockpiles by each country disposing of 34 tons of military origin plutonium. On behalf of the US government, the Department of Energy contracted with Duke, COGEMA, Stone and Webster (DCS) to design a Mixed Oxide Fuel Fabrication facility (MFFF) which would be built and operated at the DOE Savannah River Site near Aiken, South Carolina. This plant will transform the US excess weapons stockpile into MOX fuel, which will be used it in existing domestic commercial power reactors. The MFFF is based on a replication of AREVA existing facilities (La Hague for Pu polishing and Melox for MOX fabrication). In parallel with the design, construction and startup of the MFFF facility, DOE commissioned fabrication and irradiation of 4 lead test assemblies in one of the Mission Reactors to assist in obtaining NRC approval for MOX fuel loading in US NPPs prior to the production phase of the MFFF facility. This program was named 'EUROFAB', since fabrication had to be made in Europe because no facility implementing the MFFF technology was existing in the USA. The COGEMA Recycling Business unit transmitted a bid to DCS in April 2003, which proposed to perform Eurofab fabrication in its Cadarache (pellets and rods) and Melox (assembly mounting) facilities. In August 2003, the decision was made by DCS, on behalf of the DOE, to award the EUROFAB fabrication contract to COGEMA. (author)

  16. It Is Time to Cancel Medicine's Social Contract Metaphor.

    Science.gov (United States)

    Harris, John M

    2017-09-01

    There is agreement that the complex relationship between medicine and society is best described as a metaphorical social contract and that professionalism is the medical profession's contribution to this contract. Metaphors can help clarify abstract concepts, but they can also be abused if the counterfactual attributes of a metaphor become attributed to its subject. This seems to be happening with medical professionalism, which has sometimes been reduced to a contracted deliverable and a bargaining chip. The undesirable attributes of the social contract metaphor may be hindering efforts to understand and teach medical professionalism.Despite its theoretical weaknesses, the social contract metaphor has historical credibility because of its alleged association with the 1847 Code of Medical Ethics and the subsequent ascension of regular (allopathic) medicine in the early 20th century. However, the record does not support an argument that the intended purpose of the 1847 Code was to create a social contract or that one ever arose. The alternative account that a contract did arise, but physicians were poor partners, is neither satisfying nor explanatory.As now used, medicine's social contract metaphor has serious theoretical and historic weaknesses. Medical educators should remove this narrow and overworked metaphor from their discussions of professionalism. By doing this, educators and the profession in general would only lose the ability to threaten themselves with the cancellation of their social contract. In return they would open the door to a more complex and fruitful consideration of medical professionalism and medicine's relationship with society.

  17. The complexity of natural gas contracts

    International Nuclear Information System (INIS)

    De Boer, A.

    2000-01-01

    In the process of the deregulation of the energy market large consumers will have lots of opportunities to purchase natural gas and electricity cheaper than before. However, only one third seizes those opportunities. Special consultants can help to conclude supply contracts, focusing on the customer, supplier and commodity. Advantages and disadvantages of collective purchases of energy are briefly outlined

  18. Italy. Electrical contract management in local government

    International Nuclear Information System (INIS)

    Carsana, C.

    1999-01-01

    The technical and economical assessment of electric energy consumption of a public administration body (province) shows remarkable opportunities of reducing energy costs. This calls for a continuous monitoring of the supply contract parameters. It is also discussed the solution concerning the transparency in supplier-customer relationship [it

  19. Procurement Fraud: A Knowledge-Level Analysis of Contracting Personnel

    Science.gov (United States)

    2014-12-01

    goods and services for cheaper or substandard merchandise that does not conform to contract specifications. This process is also known as product...11 shows a visual depiction of these results. 48 Figure II . Number of Prut icipants by W aiTant Status C. ANALYSIS OF KNOWLEDGE QUESTIONS There

  20. 48 CFR 2937.103-70 - Department of Labor checklist to aid analysis and review of requirements for service contracts.

    Science.gov (United States)

    2010-10-01

    ... provide for adequate monitoring of contractor performance? (3) Is the statement of work written so that it... contract? (4) Will the contractor be evaluating a competitor's work? (5) Does the contract allow the...

  1. Energy security, public policy, and the role of the DOE Office of Energy Emergencies

    Energy Technology Data Exchange (ETDEWEB)

    Bjornstad, D.J.; Curlee, T.R. (Oak Ridge National Lab., TN (United States)); Bohi, D.R. (Resources for the Future, Inc., Washington, DC (United States))

    1991-11-01

    This paper addresses the concept of energy security, the costs and benefits of energy security, and policies which could potentially alter these costs and benefits. These issues are considered from the perspective of the DOE's Office of Energy Emergencies, with the goal of determining if alternative or additional roles should be open to this Office. The approach taken is limited to the economic costs and benefits of energy security, reflecting our view that the bulk of important energy security issues can at least be approached from this perspective. An energy emergency results from a sudden change in the quantity, market price, and/or social value of energy, in combination with a domestic and/or world wide energy system that cannot rapidly adjust to that change. We do not believe that mitigating the impacts of such events is always necessary, nor that it is uniquely a governmental responsibility. In fact, the first recourse in emergency preparedness should always be to the private sector. Government should deal with three different aspects of emergency energy activities. First, it should condition the decision making environment by seeing that adequate information about energy conditions is available and that its own policy position is clear. Next, it should evaluate the preparedness measures undertaken by the private sector. Finally, if it finds private sector preparation to be inadequate, government has a variety of direct and indirect means with which to intervene. One direct measure currently used is the buildup and drawdown of the strategic petroleum reserve (SPR). Others include contingency plans to override market allocations during wartime, as might be developed under the graduated mobilization response (GMR). Indirect means include a variety of tax and transfer schemes that alter existing private sector incentives to prepare. Well conceived monetary and fiscal policies complete the tools. 1 fig., 1 tab.

  2. Energy security, public policy, and the role of the DOE Office of Energy Emergencies

    International Nuclear Information System (INIS)

    Bjornstad, D.J.; Curlee, T.R.; Bohi, D.R.

    1991-11-01

    This paper addresses the concept of energy security, the costs and benefits of energy security, and policies which could potentially alter these costs and benefits. These issues are considered from the perspective of the DOE's Office of Energy Emergencies, with the goal of determining if alternative or additional roles should be open to this Office. The approach taken is limited to the economic costs and benefits of energy security, reflecting our view that the bulk of important energy security issues can at least be approached from this perspective. An energy emergency results from a sudden change in the quantity, market price, and/or social value of energy, in combination with a domestic and/or world wide energy system that cannot rapidly adjust to that change. We do not believe that mitigating the impacts of such events is always necessary, nor that it is uniquely a governmental responsibility. In fact, the first recourse in emergency preparedness should always be to the private sector. Government should deal with three different aspects of emergency energy activities. First, it should condition the decision making environment by seeing that adequate information about energy conditions is available and that its own policy position is clear. Next, it should evaluate the preparedness measures undertaken by the private sector. Finally, if it finds private sector preparation to be inadequate, government has a variety of direct and indirect means with which to intervene. One direct measure currently used is the buildup and drawdown of the strategic petroleum reserve (SPR). Others include contingency plans to override market allocations during wartime, as might be developed under the graduated mobilization response (GMR). Indirect means include a variety of tax and transfer schemes that alter existing private sector incentives to prepare. Well conceived monetary and fiscal policies complete the tools. 1 fig., 1 tab

  3. Institutional Response of Contract Farming: Its Implications on the ...

    African Journals Online (AJOL)

    The term contract as applied includes both written and oral agreements between commercial buyers and farmers. This paper does not take into account the operations of marketing parastatals and legal monopolies that do not operate on commercial basis. This is deliberately done to maintain the main thrust of neoclassical ...

  4. [Studies of high energy phenomena using muons

    International Nuclear Information System (INIS)

    1991-01-01

    This report covers the activities of the NIU high energy physics group as supported by DOE contract FG02-91ER40641 during the period from March 1991 to December 1991. Our group has three main efforts. The first is the D0 experiment at the Fermilab proton-antiproton collider, with major emphasis on its muon system. The second is the involvement of a portion of the group in Fermilab Experiment 789. Finally, we are also members of the SDC collaboration at the SSC

  5. 48 CFR 970.3200 - Policy.

    Science.gov (United States)

    2010-10-01

    ... DOE MANAGEMENT AND OPERATING CONTRACTS Contract Financing 970.3200 Policy. It is the policy of the Department of Energy (DOE) to finance management and operating contracts through advance payments and the use...

  6. Proposal to increase the amount of an existing contract for the provision of a high-speed data circuit to the USA

    CERN Document Server

    2003-01-01

    This document concerns the proposal to increase the authorized amount of an existing contract for the provision of a high-speed data circuit for Wide Area Network (WAN) connectivity between CERN and the STARLIGHT Internet Exchange in Chicago, USA. The extension will be negotiated by CERN on behalf of its partners, CNRS/IN2P3 (FR), the US Department of Energy (DoE) through the California Institute of Technology (Caltech), the US National Science Foundation (NSF), the Canadian high-energy physics community through the University of Victoria (Canada), the World Health Organization (WHO) in Geneva and the European Union funded DataTAG project. The Finance Committee is invited to approve the increase of the authorized amount of the existing contract with T-SYSTEMS INTERNATIONAL (DE) for the provision of a high-speed data circuit for an additional amount of 1 731 106 euros (2 596 660 Swiss francs), bringing the total authorized limit to 5 821 000 Swiss francs, not subject to revision. The amount in Swiss francs has...

  7. The Oil Security Metrics Model: A Tool for Evaluating the Prospective Oil Security Benefits of DOE's Energy Efficiency and Renewable Energy R&D Programs

    Energy Technology Data Exchange (ETDEWEB)

    Greene, David L [ORNL; Leiby, Paul Newsome [ORNL

    2006-05-01

    Energy technology R&D is a cornerstone of U.S. energy policy. Understanding the potential for energy technology R&D to solve the nation's energy problems is critical to formulating a successful R&D program. In light of this, the U.S. Congress requested the National Research Council (NRC) to undertake both retrospective and prospective assessments of the Department of Energy's (DOE's) Energy Efficiency and Fossil Energy Research programs (NRC, 2001; NRC, 2005). ("The Congress continued to express its interest in R&D benefits assessment by providing funds for the NRC to build on the retrospective methodology to develop a methodology for assessing prospective benefits." NRC, 2005, p. ES-2) In 2004, the NRC Committee on Prospective Benefits of DOE's Energy Efficiency and Fossil Energy R&D Programs published a report recommending a new framework and principles for prospective benefits assessment. The Committee explicitly deferred the issue of estimating security benefits to future work. Recognizing the need for a rigorous framework for assessing the energy security benefits of its R&D programs, the DOE's Office of Energy Efficiency and Renewable Energy (EERE) developed a framework and approach for defining energy security metrics for R&D programs to use in gauging the energy security benefits of their programs (Lee, 2005). This report describes methods for estimating the prospective oil security benefits of EERE's R&D programs that are consistent with the methodologies of the NRC (2005) Committee and that build on Lee's (2005) framework. Its objective is to define and implement a method that makes use of the NRC's typology of prospective benefits and methodological framework, satisfies the NRC's criteria for prospective benefits evaluation, and permits measurement of that portion of the prospective energy security benefits of EERE's R&D portfolio related to oil. While the Oil Security Metrics (OSM) methodology described

  8. Pacific Northwest Laboratory annual report for 1989 to the DOE (Department of Energy) Office of Energy Research - Part 4: Physical Sciences

    Energy Technology Data Exchange (ETDEWEB)

    Toburen, L.H.; Stults, B.R.; Mahaffey, J.A.

    1990-04-01

    This 1989 Annual Report from Pacific Northwest Laboratory (PNL) to the US Department of Energy (DOE) describes research in environment, safety, and health conducted during fiscal year 1989. The report again consists of five parts, each in a separate volume. This volume contains 20 papers. Part 4 of the Pacific Northwest Laboratory Annual Report of 1989 to the DOE Office of Energy Research includes those programs funded under the title Physical and Technological Research.'' The Field Task Program Studies reported in this document are grouped by budget category and each Field Task proposal/agreement is introduced by an abstract that describes the projects reported in that section. These reports only briefly indicate progress made during 1989. 74 refs., 29 figs., 6 tabs.

  9. Optimal contracts for wind power producers in electricity markets

    KAUST Repository

    Bitar, E.

    2010-12-01

    This paper is focused on optimal contracts for an independent wind power producer in conventional electricity markets. Starting with a simple model of the uncertainty in the production of power from a wind turbine farm and a model for the electric energy market, we derive analytical expressions for optimal contract size and corresponding expected optimal profit. We also address problems involving overproduction penalties, cost of reserves, and utility of additional sensor information. We obtain analytical expressions for marginal profits from investing in local generation and energy storage. ©2010 IEEE.

  10. [The contracting process and outsourcing in health: the scenario for dispute between public and private interests].

    Science.gov (United States)

    Albuquerque, Maria do Socorro Veloso; Morais, Heloísa Maria Mendonça de; Lima, Luci Praciano

    2015-06-01

    This research analyzed the public-private composition in the municipal health network and aspects of the contracting/outsourcing process for services over the period from 2001 to 2008. The research method used was a case study with documentary research and interviews. The interviewees were former secretaries of health, directors of regulation and district managers. The categories of analysis used were public funds, care networks and public control. The results showed that the contracting was restricted to philanthropic units. With respect to the other private establishments linked to the public care network, non-compliance with programmatic aspects was detected, such as the lack of regulation of bidding processes required for contracting. Management authorities did not actively pursue building up state public services, or the formation of care networks. The contracted establishments conducted their activities without effective external and internal control mechanisms, which are paramount for the proper use of public resources. The authors conclude that the contracting process does not significantly alter the standard of buying and selling of services and indeed does not enhance the empowering process of the role of the public domain.

  11. Contraction of an air disk caught between two different liquids

    KAUST Repository

    Thoraval, M.-J.; Thoroddsen, Sigurdur T

    2013-01-01

    When a drop impacts a pool of liquid it entraps a thin disk of air under its center. This disk contracts rapidly into a bubble to minimize surface energy. Herein we use ultra-high-speed imaging to measure the contraction speed of this disk when

  12. Marine and Hydrokinetic Renewable Energy Technologies: Potential Navigational Impacts and Mitigation Measures

    Energy Technology Data Exchange (ETDEWEB)

    Cool, Richard, M.; Hudon, Thomas, J.; Basco, David, R.; Rondorf, Neil, E.

    2009-12-10

    On April 15, 2008, the Department of Energy (DOE) issued a Funding Opportunity Announcement for Advanced Water Power Projects which included a Topic Area for Marine and Hydrokinetic Renewable Energy Market Acceleration Projects. Within this Topic Area, DOE identified potential navigational impacts of marine and hydrokinetic renewable energy technologies and measures to prevent adverse impacts on navigation as a sub-topic area. DOE defines marine and hydrokinetic technologies as those capable of utilizing one or more of the following resource categories for energy generation: ocean waves; tides or ocean currents; free flowing water in rivers or streams; and energy generation from the differentials in ocean temperature. PCCI was awarded Cooperative Agreement DE-FC36-08GO18177 from the DOE to identify the potential navigational impacts and mitigation measures for marine hydrokinetic technologies, as summarized herein. The contract also required cooperation with the U.S. Coast Guard (USCG) and two recipients of awards (Pacific Energy Ventures and reVision) in a sub-topic area to develop a protocol to identify streamlined, best-siting practices. Over the period of this contract, PCCI and our sub-consultants, David Basco, Ph.D., and Neil Rondorf of Science Applications International Corporation, met with USCG headquarters personnel, with U.S. Army Corps of Engineers headquarters and regional personnel, with U.S. Navy regional personnel and other ocean users in order to develop an understanding of existing practices for the identification of navigational impacts that might occur during construction, operation, maintenance, and decommissioning. At these same meetings, “standard” and potential mitigation measures were discussed so that guidance could be prepared for project developers. Concurrently, PCCI reviewed navigation guidance published by the USCG and international community. This report summarizes the results of this effort, provides guidance in the form of a

  13. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 89

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    Summaries are presented for the DOE contracts related to supported research for thermal recovery of petroleum, geoscience technology, and field demonstrations in high-priority reservoir classes. Data included for each project are: title, contract number, principal investigator, research organization, beginning date, expected completion date, amount of award, objectives of the research, and summary of technical progress.

  14. DOE Zero Energy Ready Home Case Study: Cobblestone Homes — 2014 Model Home, Midland, MI

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-09-01

    This builder's first DOE Zero Energy Ready Home won a Custom Builder award in the 2014 Housing Innovation Awards, scored HERS 49 without PV or HERS 44 with 1.4 kW of PV, and served as a prototype and energy efficiency demonstration model while performance testing was conducted.

  15. A preliminary assessment of the potential for 'team science' in DOE Energy Innovation Hubs and Energy Frontier Research Centers

    Energy Technology Data Exchange (ETDEWEB)

    Boardman, Craig, E-mail: boardman.10@osu.edu [John Glenn School of Public Affairs, Ohio State University (United States); Ponomariov, Branco, E-mail: branco.ponomariov@utsa.edu [Department of Public Administration, University of Texas at San Antonio (United States)

    2011-06-15

    President Obama has called for the development of new energy technologies to address our national energy needs and restore US economic competitiveness. In response, the Department of Energy has established new R and D modalities for energy research and development designed to facilitate collaboration across disciplinary, institutional, and sectoral boundaries. In this research note, we provide a preliminary assessment of the potential for essential mechanisms for coordinated problem solving among diverse actors within two new modalities at the DOE: Energy Innovation Hubs and Energy Frontier Research Centers. - Highlights: > Energy Frontier Research Centers may lack the basic mechanisms for coordinating diverse actors. > Divergent goals across diverse actors may hinder coordination in Energy Innovation Hubs. > The implementation of these and similar energy policies require further investigation.

  16. Does Renewable Energy Still Need Subsidy

    Directory of Open Access Journals (Sweden)

    Dr. Eng. Mohamed Mostafa El Khayat

    2017-12-01

    Full Text Available For many decades, it has been stated that renewable energy, RE, needs subsidy, otherwise it will not be able to compete or sustain. For a certain level, this statement was valid. In this period, the investment costs for both wind and photovoltaic, PV, were high. In other words, production costs of both of them reached around 7.0 and 13.0 Cent US$ per kWh. On the other hand, oil and natural gas, NG, prices were low; i.e. less than US$ 30.0 per oil barrel and around US$ 4.0 per million British thermal unit, MMBTU, of NG. Also, policies of promoting RE were limited; almost there are two main policies, Feed-in-Tariff, FiT, in limited developed countries and international tenders. As a result, investment in RE was usually led by developed countries and minor share from the developing countries. This was the scene of RE before around 10 years. Nowadays, the scene of RE totally differs. Starting from the policies side, through auctions in both solar and wind energies, new records of prices have been reached. In numbers, in the field of wind energy Morocco and Egypt already signed contracts with prices lower than 4.0 US$ Cents/kWh. For PV, there is a dramatic devaluation in the prices. Now we are speaking for less than 0.7 million US$ per MW for turnkey projects. As a result, during the last couple of years, the global RE market witnessed a bundle of an outstanding prices, El-Sewihan Project at Abu Dhabi, 2.42 US$ Cent/kWh. Mexico and Dubai projects, 3.6 and 3.0 US$ Cent/kWh. Few days ago, Dubai Electricity and Water Authority, DEWA, received $9.45 cents per kilowatt-hour for its 200MW concentrated solar power (CSP plant. All these figures, and others, gave us important messages; 1 Despite low prices of oil and NG, RE is able to compete and offer outstanding prices, 2 Wind and PV technologies do not need any kind of subsidy, rather than they need a real free market to compete, 3 CSP is a low hanging fruit and it will witness a frog-leap during the

  17. Magnetic-Island Contraction and Particle Acceleration in Simulated Eruptive Solar Flares

    Science.gov (United States)

    Guidoni, S. E.; Devore, C. R.; Karpen, J. T.; Lynch, B. J.

    2016-01-01

    The mechanism that accelerates particles to the energies required to produce the observed high-energy impulsive emission in solar flares is not well understood. Drake et al. proposed a mechanism for accelerating electrons in contracting magnetic islands formed by kinetic reconnection in multi-layered current sheets (CSs). We apply these ideas to sunward-moving flux ropes (2.5D magnetic islands) formed during fast reconnection in a simulated eruptive flare. A simple analytic model is used to calculate the energy gain of particles orbiting the field lines of the contracting magnetic islands in our ultrahigh-resolution 2.5D numerical simulation. We find that the estimated energy gains in a single island range up to a factor of five. This is higher than that found by Drake et al. for islands in the terrestrial magnetosphere and at the heliopause, due to strong plasma compression that occurs at the flare CS. In order to increase their energy by two orders of magnitude and plausibly account for the observed high-energy flare emission, the electrons must visit multiple contracting islands. This mechanism should produce sporadic emission because island formation is intermittent. Moreover, a large number of particles could be accelerated in each magneto hydro dynamic-scale island, which may explain the inferred rates of energetic-electron production in flares. We conclude that island contraction in the flare CS is a promising candidate for electron acceleration in solar eruptions.

  18. Expand the Modeling Capabilities of DOE's EnergyPlus Building Energy Simulation Program

    Energy Technology Data Exchange (ETDEWEB)

    Don Shirey

    2008-02-28

    EnergyPlus{trademark} is a new generation computer software analysis tool that has been developed, tested, and commercialized to support DOE's Building Technologies (BT) Program in terms of whole-building, component, and systems R&D (http://www.energyplus.gov). It is also being used to support evaluation and decision making of zero energy building (ZEB) energy efficiency and supply technologies during new building design and existing building retrofits. Version 1.0 of EnergyPlus was released in April 2001, followed by semiannual updated versions over the ensuing seven-year period. This report summarizes work performed by the University of Central Florida's Florida Solar Energy Center (UCF/FSEC) to expand the modeling capabilities of EnergyPlus. The project tasks involved implementing, testing, and documenting the following new features or enhancement of existing features: (1) A model for packaged terminal heat pumps; (2) A model for gas engine-driven heat pumps with waste heat recovery; (3) Proper modeling of window screens; (4) Integrating and streamlining EnergyPlus air flow modeling capabilities; (5) Comfort-based controls for cooling and heating systems; and (6) An improved model for microturbine power generation with heat recovery. UCF/FSEC located existing mathematical models or generated new model for these features and incorporated them into EnergyPlus. The existing or new models were (re)written using Fortran 90/95 programming language and were integrated within EnergyPlus in accordance with the EnergyPlus Programming Standard and Module Developer's Guide. Each model/feature was thoroughly tested and identified errors were repaired. Upon completion of each model implementation, the existing EnergyPlus documentation (e.g., Input Output Reference and Engineering Document) was updated with information describing the new or enhanced feature. Reference data sets were generated for several of the features to aid program users in selecting proper

  19. The United States Department of Energy (DOE) Computerized Accident/Incident Reporting System (CAIRS)

    International Nuclear Information System (INIS)

    Briscoe, G.J.

    1993-01-01

    The Department of Energy's (DOE) Computerized Accident/Incident Reporting System (CAIRS) is a comprehensive data base containing more than 50,000 investigation reports of injury/illness, property damage and vehicle accident cases representing safety data from 1975 to the present for more than 150 DOE contractor organizations. A special feature is that the text of each accident report is translated using a controlled dictionary and rigid sentence structure called Factor Relationship and Sequence of Events (FRASE) that enhances the ability to retrieve specific types of information and to perform detailed analyses. DOE summary and individual contractor reports are prepared quarterly and annually. In addition, ''Safety Performance Profile'' reports for individual organizations are prepared to provide advance information to appraisal teams, and special topical reports are prepared for areas of concern such as an increase in the number of security injuries or environmental releases. The data base is open to all DOE and Contractor registered users with no access restrictions other than that required by the Privacy Act

  20. Banking contracts

    OpenAIRE

    Durčáková, Klára

    2010-01-01

    Resumé - Bank Contracts Bank Contracts are an integral part of our everyday lives. Citizen and bussines entities used bank contracts very often. Despite this fact we can't find legal definition in the Czech law. Banking contracts understand contracts that are signed by banks in their business activities and obligations under these contracts arise. While the banking contracts have been widely used, in Czech law there is not too much literature and judgements abou this issue. Lack of legislatio...

  1. 41 CFR 109-38.903-50 - Reporting DOE motor vehicle data.

    Science.gov (United States)

    2010-07-01

    ... AVIATION, TRANSPORTATION, AND MOTOR VEHICLES 38-MOTOR EQUIPMENT MANAGEMENT 38.9-Federal Motor Vehicle Fleet... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Reporting DOE motor vehicle data. 109-38.903-50 Section 109-38.903-50 Public Contracts and Property Management Federal...

  2. Selected DOE headquarters publications, October 1979

    International Nuclear Information System (INIS)

    1981-01-01

    The publication provides cumulative listings of and an index to DOE headquarters publications issued since October 1979. Publications issued during October 1977 to September 1979 are covered in DOE/AD-0010/6. Publications from 26 headquarters offices are presented and consist of three types: publications dealing mainly with program and policy that are attributed to and issued by headquarters organizations; reports prepared by contractors (and published by DOE) to describe research and development work they have performed for the Department under 01-type contracts; and environmental development plans, impact statements, and readiness documents. Availability of the documents is described

  3. Selected DOE headquarters publications, October 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-01-01

    The publication provides cumulative listings of and an index to DOE headquarters publications issued since October 1979. Publications issued during October 1977 to September 1979 are covered in DOE/AD-0010/6. Publications from 26 headquarters offices are presented and consist of three types: publications dealing mainly with program and policy that are attributed to and issued by headquarters organizations; reports prepared by contractors (and published by DOE) to describe research and development work they have performed for the Department under 01-type contracts; and environmental development plans, impact statements, and readiness documents. Availability of the documents is described.

  4. Wess-Zumino term for the AdS superstring and generalized Inoenue-Wigner contraction

    International Nuclear Information System (INIS)

    Hatsuda, Machiko; Sakaguchi, Makoto

    2003-01-01

    We examine a Wess-Zumino term, written in a form of bilinear in superinvariant currents, for a superstring in anti-de Sitter (AdS) space, and derive a procedure for obtaining the correct flat limit. The standard Inoenue-Wigner contraction does not give the correct flat limit but, rather, gives zero. This erroneous result originates from the fact that the fermionic metric of the super-Poincare group is degenerate. We propose a generalization of the Inoenue-Wigner contraction from which a 'nondegenerate' super-Poincare group is derived from the super-AdS group. For this reason, this contraction gives the correct flat limit of this Wess-Zumino term. We also discuss the M-algebra obtained using this generalized Inoenue-Wigner contraction from osp(1|32). (author)

  5. Belene nuclear power plant contracting approach

    International Nuclear Information System (INIS)

    Tankosic, D.; Mignone, O.

    2004-01-01

    Historically, three main types of project execution and contractual approaches have been applied to energy and industrial projects, including nuclear projects. These approaches are grouped into three broad categories: 1) Turnkey Approach; 2) Split Package (Island) Approach; and 3)Multiple Package Approach. Based on a preliminary screening done by an ongoing feasibility study work for NPP Belene (NEK contract to Parsons E and C), the recommended approach is going to follow that general trend i.e., with some variation between the Split Package and the Turnkey approach. Before deciding on an execution approach or at least before issuing bid specifications for the nuclear power plant, it is prudent, even for a country with existing nuclear power program (like Bulgaria), to re-check/verify capabilities of the interested bidders to handle contracts of this size and nature. During the last decades, nuclear energy went through a substantial restructuring and most of the capabilities (human and financial) that existed before are not any more available. This re-checking should mainly cover the experience of the bidders as regards the design, construction and operation of the stations where they were involved, but also include items such as local experience, capability to bring favorable financing, liability coverage, general background, potential and organizational structures. The advantages and disadvantages for the Owner of the three contracting approaches can be briefly summarized as follows: Turnkey Approach - main advantages: all responsibilities rest in a Contractor or Consortium. Main disadvantages - limited project control by Owner and restricted local participation. For Split Package Contract Approach main advantage are more favorable financing conditions and increased local participation. Main disadvantage is the increased interface problems. For Multiple package Contract Approach main advantages are the opportunity to tailor the plant and maximum increase of local

  6. Greening Public Buildings: ESCO-Contracting in Danish Municipalities

    DEFF Research Database (Denmark)

    Jensen, Jesper Ole; Nielsen, Susanne Balslev; Rohr Hansen, Jesper

    2013-01-01

    This paper presents current research on Danish municipalities’ use of Energy Service Companies (ESCO) as a way to improve the standard of public buildings and to increase energy efficiency. In recent years more and more municipalities have used ESCO-contracts to retrofit existing public buildings...

  7. 25 CFR 900.131 - What role does the Secretary play during the performance of a self-determination construction...

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What role does the Secretary play during the performance... CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.131 What role does the Secretary play during the performance of a self-determination construction contract? (a) If...

  8. New York Power Authority`s energy-efficient refigerator program for the New York City Housing Authority - savings evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Pratt, R.G.; Miller, J.D.

    1997-09-01

    The New York Power Authority (NYPA) and the New York City Housing Authority (NYCHA) are replacing refrigerators in New York City public housing with new, highly energy-efficient models over a five-year period. This report describes the analysis of the energy cost savings achieved through the replacement of 20,000 refrigerators in 1996, the first year of the NYPA/NYCHA program. The NYPA/NYCHA project serves as the lynchpin of a larger program designed to offer energy-efficient appliances to housing authorities across the country. The national program is a partnership between the U.S. Department of Energy (DOE) and the Consortium for Energy Efficiency (CEE). Starting with the 1997 refrigerator contract, this program invites other housing authorities to join NYPA in its volume purchase of energy-efficient refrigerators, at the same price and terms available to NYPA. Through these volume purchases, DOE`s ENERGY STAR{reg_sign} Partnerships program hopes to encourage appliance manufacturers to bring more efficient appliances to the market and to provide volume purchasers with the per-unit price savings of a bulk purchaser. DOE asked the Pacific Northwest National Laboratory (PNNL) to establish a protocol for evaluating the savings achieved with the NYPA refrigerators. That protocol is summarized in this report.

  9. DOE Zero Energy Ready Home Case Study: Alliance Green Builders, Casa Aguila

    Energy Technology Data Exchange (ETDEWEB)

    Pacific Northwest National Laboratory

    2017-09-01

    Alliance Green Builders built this 3,129-ft2 home in the hills above Ramona, California, to the high-performance criteria of the DOE Zero Energy Ready Home (ZERH) program. The home should perform far better than net zero thanks to a super-efficient building shell, a wind turbine, three suntracking solar photovoltaic arrays, and solar thermal water heating.

  10. Skeletal muscle contraction in protecting joints and bones by absorbing mechanical impacts

    Science.gov (United States)

    Rudenko, O. V.; Tsyuryupa, S.; Sarvazyan, A.

    2016-09-01

    We have previously hypothesized that the dissipation of mechanical energy of external impact is a fundamental function of skeletal muscle in addition to its primary function to convert chemical energy into mechanical energy. In this paper, a mathematical justification of this hypothesis is presented. First, a simple mechanical model, in which the muscle is considered as a simple Hookean spring, is considered. This analysis serves as an introduction to the consideration of a biomechanical model taking into account the molecular mechanism of muscle contraction, kinetics of myosin bridges, sarcomere dynamics, and tension of muscle fibers. It is shown that a muscle behaves like a nonlinear and adaptive spring tempering the force of impact and increasing the duration of the collision. The temporal profiles of muscle reaction to the impact as functions of the levels of muscle contraction, durations of the impact front, and the time constants of myosin bridges closing, are obtained. The absorption of mechanical shock energy is achieved due to the increased viscoelasticity of the contracting skeletal muscle. Controlling the contraction level allows for the optimization of the stiffness and viscosity of the muscle necessary for the protection of the joints and bones.

  11. DOE'S award fees at Rocky Flats do not adequately reflect ES and H problems

    International Nuclear Information System (INIS)

    1989-10-01

    Despite the persistance of significant environmental, safety, and health problems at the Rocky Flats plant, it's contractor has received substantial monetary awards from the Department of Energy for operating the plant. During fiscal years 1986 through 1988, approximately $26.8 million was received in award fees - about 84 percent of the total award fees that were available under the contract with DOE. This report identified a number of problems that raise concerns about how the award process is being administered: significant ES and H deficiencies have been downplayed in the evaluation process; the process has placed more emphasis on production rather than on ES and H performance; and the evaluations have not been reviewed by DOE headquarters organizations that have important roles in the conduct of activities. This report recommends that DOE restructure its award fee process to provide a clear understanding to its contractors what they will be losing in award fees for certain types of ES and H problems

  12. Energy Programs at the Johns Hopkins University Applied Physics Laboratory, Quarterly Report, July-September 1980

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    The Johns Hopkins University Applied Physics Laboratory, under contracts with several agencies of the federal government, is engaged in developing energy resources, utilization concepts, and monitoring and storage methods. This Quarterly Report summarizes the work on the various tasks as of 31 September 1980. The Energy Quarterly Report is divided into four sections. The first, Geothermal Energy Development Planning and Technical Assistance, supported by the Department of Energy/Division of Geothermal Energy (DOE/DGE), contains reports on the progress of geothermal-related tasks on which effort was concentrated during the quarter. The second section, Operational Research, Hydroelectric Power Development, supported by the Department of Energy/Resource Applications (DOE/RA), contains reports on small-scale hydroelectric investigations in the southeastern states. The third section, Seismotectonic Investigations, supported by the Reactor Safety Research Division of the Nuclear Regulatory Commission (NRC), reports on neotectonic investigations of the Manhattan Prong. The fourth section, Energy Conversion and Storage Techniques, contains three articles. The first is an evaluation of the Einstein refrigerator, supported by independent IR&D funds. The second concerns OTEC pilot plant performance calculations, supported by the Department of Energy/Division of Central Solar Technology (DOE/CST). The third, describing a study of landfill methane recovery, is supported by the National Park Service.

  13. DOE Zero Energy Ready Home Case Study: Boulder ZED Design Build - Boulder, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-11-01

    This case study describes a DOE Zero Energy Ready Home in Boulder, Colorado, that scored HERS 38 without PV and 0 with PV. This 2,504 ft2 custom home has advanced framed walls, superior insulation a ground-source heat pump, ERV, and triple-pane windows.

  14. Green Power Partnership Long-term Contracts

    Science.gov (United States)

    The U.S. EPA's Green Power Partnership is a voluntary program designed to reduce the environmental impact of electricity generation by promoting renewable energy. This page lists Partners that signed a contract to purchase green power for 5 years or more.

  15. Municipal solid waste management: A bibliography of US Department of Energy contractor report through 1994

    Energy Technology Data Exchange (ETDEWEB)

    None

    1995-09-01

    U.S. Department of Energy contractors continue to conduct research targeting the productive and responsible use of the more than 516,000 metric tons (567,000 tons) of municipal solid waste (MSW) that is generated each day in the United States. It is becoming more and more prudent to improve current methods of MSW management and to continue to search for additional cost-effective, energy-efficient means to manage our MSW resource. This bibliography provides information about technical reports on energy from municipal waste that were prepared under grants or contracts from the US DOE. The reports listed focus on energy from municipal waste technologies and energy conservation in wastewater treatment.

  16. HIA 2016 DOE Zero Energy Ready Home Case Study: Mandalay Homes, Cathedral Point at The Dells, Prescott, AZ

    Energy Technology Data Exchange (ETDEWEB)

    Pacific Northwest National Laboratory

    2016-09-01

    Case study of a DOE 2016 Housing Innovation Award winning production home in the mixed-dry climate that met the DOE Zero Energy Ready Home criteria and achieved a HERS 47 without PV or HERS -2 with PV.

  17. Role of performance measures in reengineering U.S. Department of Energy's management of environmental management programs

    International Nuclear Information System (INIS)

    Murthy, K.S.; Harroun, W.P.

    1996-01-01

    The Rocky Flats Environmental Technology Site (Rocky Flats) contributed to America's defense up to the end of the Cold War. It is one of several large US Department of Energy (DOE) nuclear industrial facilities, currently undergoing cleanup and closure. The Site was constructed in a sparsely populated area along the Rocky Mountain Foothills, near Denver, in 1952. In the 45 years since, Denver has grown to a major metropolitan area. Over 2 million people live within the Site's 50-mile radius. The Site is directly upstream of water supplies that serve over 300,000 people. As a result, accelerated cleanup, consolidation, reuse, and closure of the Site are the current essentials. The Site has had three management and operating (M and O) contractors since inception. In keeping with the shift in the Site's paradigm from one of weapon-parts production program to cleanup and closure project, DOE changed its contracting philosophy for the Site from the M and O type of contract to a Performance-based Incentive Fee Integrating Management contract (PBIF IMC). Doe selected the Site's fourth contractor as an IMC contractor in July 1995. Kaiser-Hill Company L.L.C. was awarded the contract and assumed IMC responsibility for the Site on July 1, 1995. Integral to this contract is the establishment and implementation of a performance measures system. Performance measures are the bases for incentives that motivate the IMC and the subcontractors working at Rocky Flats. This paper provides an overview of Performance Measures system practiced at Rocky Flats from July 1995 to December 1995. Also described are the developments in reengineering during the July 1995--March 1996 interval

  18. DOE/Industrial Technologies Program DOE Award Number DE-FG36-05GO15099 Plant Wide Energy Efficiency Assessment Pilgrims Pride Corporation – Mt Pleasant Facility

    Energy Technology Data Exchange (ETDEWEB)

    Paper, Riyaz; Dooley, Bill; Turpish, William J; Symonds, Mark; Carswell, Needham

    2007-04-13

    The U. S. Department of Energy’s (DOE) Industrial Technologies Program (ITP), through Oak Ridge National Laboratory, is supporting plant wide energy efficiency assessments that will lead to substantial improvements in industrial efficiency, waste reduction, productivity, and global competitiveness in industries identified in ITP’s Industries of the Future. The stated goal of the assessments is to develop a comprehensive strategy at manufacturing locations that will significantly increase plant productivity, profitability, and energy efficiency, and reduce environmental emissions. ITP awarded a contract to Pilgrim’s Pride Corporation to conduct a plant wide energy efficiency assessment for their Mt Pleasant Facility in Mt Pleasant, Texas. Pilgrim’s Pride Corporation is the largest poultry company in the U.S. and Mexico producing nearly 9 billion pounds of poultry per year. Pilgrim's Pride products are sold to foodservice, retail and frozen entrée customers. Pilgrim's Pride owns and operates 37 chicken processing plants (34 in the U.S. and three in Mexico), 12 prepared foods plants and one turkey processing plant. Thirty-five feed mills and 49 hatcheries support these plants. Pilgrim's Pride is ranked number 382 on 2006's FORTUNE 500 list and net sales were $7.4 billion. In Mt. Pleasant, Texas, Pilgrim's Pride operates one of the largest prepared foods plants in the United States, with the capability of producing 2,000 different products and the capacity to turn out more than 7 million pounds of finished goods per week. The facility is divided into distinct departments: East Kill, West Kill, Prepared Foods, Protein Conversion, Wastewater Treatment, and Truck Shop. Facility processes include killing, eviscerating, refrigeration, baking, frying, and protein conversion. Pilgrim’s Pride formed a team to complete the plant wide energy efficiency assessment. The scope of work for this project was to: provide the analysis of departmental

  19. Environmental Assessment Expanded Ponnequin Wind Energy Project Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-03-02

    The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCO) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. DOE completed an environmental assessment of the original proposed project in August 1997. Since then, the geographic scope and the design of the project changed, necessitating additional review of the project under the National Environmental Policy Act. The project now calls for the possible construction of up to 48 wind turbines on State and private lands. PSCo and its partners have initiated construction of the project on private land in Weld County, Colorado. A substation, access road and some wind turbines have been installed. However, to date, DOE has not provided any funding for these activities. DOE, through its Commercialization Ventures Program, has solicited applications for financial assistance from state energy offices, in a teaming arrangement with private-sector organizations, for projects that will accelerate the commercialization of emerging renewable energy technologies. The Commercialization Ventures Program was established by the Renewable Energy and Energy Efficiency Technology Competitiveness Act of 1989 (P.L. 101-218) as amended by the Energy Policy Act of 1992 (P.L. 102-486). The Program seeks to assist entry into the marketplace of newly emerging renewable energy technologies, or of innovative applications of existing technologies. In short, an emerging renewable energy technology is one which has already proven viable but which has had little or no operational experience. The Program is managed by the Department of Energy, Office of Energy Efficiency and Renewable Energy. The

  20. Does energy efficiency improve technological change and economic growth in developing countries?

    International Nuclear Information System (INIS)

    Cantore, Nicola; Calì, Massimiliano; Velde, Dirk Willem te

    2016-01-01

    Does a trade-off exist between energy efficiency and economic growth? This question underlies some of the tensions between economic and environmental policies, especially in developing countries that often need to expand their industrial base to grow. This paper contributes to the debate by analyzing the relationship between energy efficiency and economic performance at the micro- (total factor productivity) and macro-level (countries' economic growth). It uses data on a large sample of manufacturing firms across 29 developing countries to find that lower levels of energy intensity are associated with higher total factor productivity for the majority of these countries. The results are robust to a variety of checks. Suggestive cross-country evidence points towards the same relation measured at the macro-level as well. - Highlights: •Total factor productivity is an accurate proxy of technological change. •Energy efficiency triggers total factor productivity especially in manufacturing. •Technological change via energy efficiency in manufacturing is an engine of growth.

  1. Decisions on Energy Demand Response Option Contracts in Smart Grids Based on Activity-Based Costing and Stochastic Programming

    Directory of Open Access Journals (Sweden)

    Alfred J. Hildreth

    2013-01-01

    Full Text Available Smart grids enable a two-way energy demand response capability through which a utility company offers its industrial customers various call options for energy load curtailment. If a customer has the capability to accurately determine whether to accept an offer or not, then in the case of accepting an offer, the customer can earn both an option premium to participate, and a strike price for load curtailments if requested. However, today most manufacturing companies lack the capability to make the correct contract decisions for given offers. This paper proposes a novel decision model based on activity-based costing (ABC and stochastic programming, developed to accurately evaluate the impact of load curtailments and determine as to whether or not to accept an energy load curtailment offer. The proposed model specifically targets state-transition flexible and Quality-of-Service (QoS flexible energy use activities to reduce the peak energy demand rate. An illustrative example with the proposed decision model under a call-option based energy demand response scenario is presented. As shown from the example results, the proposed decision model can be used with emerging smart grid opportunities to provide a competitive advantage to the manufacturing industry.

  2. Natural gas contracts in an emerging competitive market

    International Nuclear Information System (INIS)

    Sutherland, R.J.

    1992-01-01

    Natural gas is being viewed by many as the fuel of the 1990s and beyond because of its environmental qualities, relatively low cost and significant domestic resource base. However, in the Fall of 1991, a group of electric utility executives met with then Deputy Secretary of Energy Henson Moore and asserted that an inability to obtain long term gas contracts meant that supplies are unreliable and construction of gas-fueled generating stations is being discouraged. This study was requested by the Deputy Secretary to address the issues surrounding long-term gas contracts and supply reliability. The relationship between supply reliability and contracts is explained in terms of the number of buyers and sellers in a market. With the appropriate state regulatory policies, utilities can contract for gas and obtain reliable supplies at competitive market prices. Public utility commissioners are encouraged to permit utilities a free choice in signing gas contracts, but to allow only competitive market prices to be reflected in allowable fuel costs

  3. Natural gas contracts in an emerging competitive market

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, R.J.

    1992-11-01

    Natural gas is being viewed by many as the fuel of the 1990s and beyond because of its environmental qualities, relatively low cost and significant domestic resource base. However, in the Fall of 1991, a group of electric utility executives met with then Deputy Secretary of Energy Henson Moore and asserted that an inability to obtain long term gas contracts meant that supplies are unreliable and construction of gas-fueled generating stations is being discouraged. This study was requested by the Deputy Secretary to address the issues surrounding long-term gas contracts and supply reliability. The relationship between supply reliability and contracts is explained in terms of the number of buyers and sellers in a market. With the appropriate state regulatory policies, utilities can contract for gas and obtain reliable supplies at competitive market prices. Public utility commissioners are encouraged to permit utilities a free choice in signing gas contracts, but to allow only competitive market prices to be reflected in allowable fuel costs.

  4. Natural gas contracts in an emerging competitive market

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, R.J.

    1992-01-01

    Natural gas is being viewed by many as the fuel of the 1990s and beyond because of its environmental qualities, relatively low cost and significant domestic resource base. However, in the Fall of 1991, a group of electric utility executives met with then Deputy Secretary of Energy Henson Moore and asserted that an inability to obtain long term gas contracts meant that supplies are unreliable and construction of gas-fueled generating stations is being discouraged. This study was requested by the Deputy Secretary to address the issues surrounding long-term gas contracts and supply reliability. The relationship between supply reliability and contracts is explained in terms of the number of buyers and sellers in a market. With the appropriate state regulatory policies, utilities can contract for gas and obtain reliable supplies at competitive market prices. Public utility commissioners are encouraged to permit utilities a free choice in signing gas contracts, but to allow only competitive market prices to be reflected in allowable fuel costs.

  5. A progress report on DOE's advanced hydropower turbine systems program

    International Nuclear Information System (INIS)

    Sale, M.J.; Cada, G.F.; Rinehart, B.E.

    1997-01-01

    Recent hydropower research within the U.S. Department of Energy (DOE) has focused on the development of new turbine designs that can produce hydroelectricity without such adverse environmental affects as fish entrainment/impingement or degradation of water quality. In partnership with the hydropower industry, DOE's advanced turbine program issued a Request for Proposals for conceptual designs in October 1994. Two contracts were awarded for this initial program phase, work on which will be complete this year. A technical advisory committee with representatives from industry, regulatory agencies, and natural resource agencies was also formed to guide the DOE turbine research. The lack of quantitative biological performance criteria was identified by the committee as a critical knowledge gap. To fill this need, a new literature review was completed on the mechanisms of fish mortality during turbine passage (e.g., scrape/strike, shear, press change, etc.), ways that fish behavior affects their location and orientation in turbines, and how these turbine passage stresses can be measured. Thus year, new Laboratory tests will be conducted on fish response to shear, the least-well understood mechanism of stress. Additional testing of conceptual turbine designs depends on the level of federal funding for this program

  6. DEMONSTRATION OF THE DOE INTERIM ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL RESIDENTIAL BUILDINGS

    Energy Technology Data Exchange (ETDEWEB)

    Lee, A. D.; Baechler, H. C.; Di Massa, F. V.; Lucas, R. G.; Shankle, D. L.

    1992-01-01

    In accordance with federal legislation, the U.S. Department of Energy (DOE) has sponsored a study to demonstrate use of its Interim Energy Conservation Standards for New Federal Residential Buildings. The demonstration study was conducted by DOE and the Pacific Northwest Laboratory (PNL). The demonstration is the second step in a three-step process: I) development of interim standards, 2) demonstration of the interim standards, and 3) development of final standards. The standards are mandatory for federal agency housing procurements. Nevertheless, PNL found at the start of the demonstration that agency use of the interim standards had been minimal. The purpose of the standards is to improve the energy efficiency of federal housing and increase the use of nondepletable energy sources. In accordance with the legislation, the standards were to be performance-based rather than prescribing specific energy conservation measures. To fulfill this aspect of the legislation, the standards use a computer software program called COSTSAFR which generates a point system that individualizes the standards to specific projects based on climate, housing type, and fuel costs. The standards generate minimum energy-efficiency requirements by applying the life-cycle cost methodology developed for federal projects. For the demonstration, PNL and DOE chose five federal agency housing projects which had been built in diverse geographic and climate regions. Participating agencies were the Air Force, the Army (which provided two case studies), the Navy, and the Department of Health and Human Services. PNL worked with agency housing procurement officials and designers/architects to hypothetically apply the interim standards to the procurement and design of each housing project. The demonstration started at the point in the project where agencies would establish their energyefficiency requirements for the project and followed the procurement process through the designers' use of the point

  7. 23 CFR 635.121 - Contract time and contract time extensions.

    Science.gov (United States)

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.121 Contract time and contract time extensions. (a) The STD should have adequate written procedures for the determination of contract... 23 Highways 1 2010-04-01 2010-04-01 false Contract time and contract time extensions. 635.121...

  8. Environmental labelling of electricity delivery contracts in Sweden

    International Nuclear Information System (INIS)

    Kaaberger, Tomas

    2003-01-01

    Competition in the electricity market allows customers to choose between suppliers. As a consequence, customers may demand electricity from specified sources of energy. In Sweden, the Swedish Society for Nature Conservation (SSNC), operates a system of environmental labelling of electricity delivery contracts since 1996. Labelling is available for suppliers offering electricity from renewable sources of energy with some additional criteria. Companies may acquire a licence to use the label by showing ability to deliver such electricity and by agreeing to be audited. The system is private independent. It is operating on the bases of credibility earned by the SSNC during 90 years as an environmental organisation and 10 years as operator of environmental labelling of consumer products. The system is market oriented, compatible with WTO and EU market principles, and independent of governmental environmental restrictions, subsidy or quota systems. It is relying on voluntary agreements. The results are desirable if only a few by electricity under labelled contracts as well as if every customer do so. The market is growing. A majority of the suppliers have a license and may offer labelled contracts. In the year 2000, 7% of all electricity sold to final consumers was sold under labelled contracts

  9. Information Systems Development Contracts: an exploratory study of Australian legal practitioners' and Information Systems professionals' perceptions

    Directory of Open Access Journals (Sweden)

    Phil Joyce

    2003-05-01

    Full Text Available IS professionals are primarily concerned with the development of a project to meet the goals of a client. Unfortunately, IS professional do not always pay close attention to the contract or to its management and are often unaware of the legal implications of the contracts to which they are assenting. Legal advice can be sought during pre-contractual processes to help ensure that the contract meets the expectations of all the parties. If the project does not meet stakeholder’s expectations, thus causing a contract to come into dispute, lawyers may be called in to review the contract and to seek a settlement. This paper reports an exploratory study of the differences in perceptions of IS development contracts that exist between IS professionals and legal practitioners.

  10. 41 CFR 102-85.20 - What does an Occupancy Agreement (OA) do?

    Science.gov (United States)

    2010-07-01

    ... defines GSA's relationship with each customer agency and: (a) Establishes specific financial terms... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does an Occupancy Agreement (OA) do? 102-85.20 Section 102-85.20 Public Contracts and Property Management Federal Property...

  11. A DOE Perspective

    Science.gov (United States)

    Bennett, Kristin

    2004-03-01

    As one of the lead agencies for nanotechnology research and development, the Department of Energy (DOE) is revolutionizing the way we understand and manipulate materials at the nanoscale. As the Federal government's single largest supporter of basic research in the physical sciences in the United States, and overseeing the Nation's cross-cutting research programs in high-energy physics, nuclear physics, and fusion energy sciences, the DOE guides the grand challenges in nanomaterials research that will have an impact on everything from medicine, to energy production, to manufacturing. Within the DOE's Office of Science, the Office of Basic Energy Sciences (BES) leads research and development at the nanoscale, which supports the Department's missions of national security, energy, science, and the environment. The cornerstone of the program in nanoscience is the establishment and operation of five new Nanoscale Science Research Centers (NSRCs), which are under development at six DOE Laboratories. Throughout its history, DOE's Office of Science has designed, constructed and operated many of the nation's most advanced, large-scale research and development user facilities, of importance to all areas of science. These state-of-the art facilities are shared with the science community worldwide and contain technologies and instruments that are available nowhere else. Like all DOE national user facilities, the new NSRCs are designed to make novel state-of-the-art research tools available to the world, and to accelerate a broad scale national effort in basic nanoscience and nanotechnology. The NSRCs will be sited adjacent to or near existing DOE/BES major user facilities, and are designed to enable national user access to world-class capabilities for the synthesis, processing, fabrication, and analysis of materials at the nanoscale, and to transform the nation's approach to nanomaterials.

  12. DOE (Department of Energy) natural phenomena guidelines flood design and evaluation

    International Nuclear Information System (INIS)

    McCann, M.W.; Savy, J.B.

    1989-01-01

    Design and evaluation guidelines for DOE (Department of Energy) facilities subjected to earthquake, wind/tornado, and flood have been developed and presented in UCRL-15910 (Ref.1). This paper summarizes Chapter 6 of UCRL-15910 describing the philosophy and procedures for the design or evaluation of facilities for flood. The flood design and evaluation guidelines seek to ensure that DOE facilities satisfy the performance goals described in UCRL-15910. The guidelines are applicable to new and existing construction; however, in the evaluation of existing facilities, fewer design options may be available to satisfy the performance goals. Evaluation of the flood design for a facility consists of: (1) defining the design basis flood (DBFL), (2) evaluating site conditions (e.g., facility location, location of openings and doorways), and (3) assessing flood design strategies (e.g., build above DBFL levels, harden the site)

  13. Life cycle cost-based risk model for energy performance contracting retrofits

    Science.gov (United States)

    Berghorn, George H.

    Buildings account for 41% of the primary energy consumption in the United States, nearly half of which is accounted for by commercial buildings. Among the greatest energy users are those in the municipalities, universities, schools, and hospitals (MUSH) market. Correctional facilities are in the upper half of all commercial building types for energy intensity. Public agencies have experienced reduced capital budgets to fund retrofits; this has led to the increased use of energy performance contracts (EPC), which are implemented by energy services companies (ESCOs). These companies guarantee a minimum amount of energy savings resulting from the retrofit activities, which in essence transfers performance risk from the owner to the contractor. Building retrofits in the MUSH market, especially correctional facilities, are well-suited to EPC, yet despite this potential and their high energy intensities, efficiency improvements lag behind that of other public building types. Complexities in project execution, lack of support for data requests and sub-metering, and conflicting project objectives have been cited as reasons for this lag effect. As a result, project-level risks must be understood in order to support wider adoption of retrofits in the public market, in particular the correctional facility sub-market. The goal of this research is to understand risks related to the execution of energy efficiency retrofits delivered via EPC in the MUSH market. To achieve this goal, in-depth analysis and improved understanding was sought with regard to ESCO risks that are unique to EPC in this market. The proposed work contributes to this understanding by developing a life cycle cost-based risk model to improve project decision making with regard to risk control and reduction. The specific objectives of the research are: (1) to perform an exploratory analysis of the EPC retrofit process and identify key areas of performance risk requiring in-depth analysis; (2) to construct a

  14. 17 CFR 230.151 - Safe harbor definition of certain “annuity contracts or optional annuity contracts” within the...

    Science.gov (United States)

    2010-04-01

    ... the contract does not vary according to the investment experience of a separate account; (2) The insurer for the life of the contract (i) Guarantees the principal amount of purchase payments and interest... section to net purchase payments and interest credited thereto; and (3) The insurer guarantees that the...

  15. DOE handbook electrical safety

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    Electrical Safety Handbook presents the Department of Energy (DOE) safety standards for DOE field offices or facilities involved in the use of electrical energy. It has been prepared to provide a uniform set of electrical safety guidance and information for DOE installations to effect a reduction or elimination of risks associated with the use of electrical energy. The objectives of this handbook are to enhance electrical safety awareness and mitigate electrical hazards to employees, the public, and the environment.

  16. Heat contracting - a contribution to climate protection, security of supply and competition; Waerme-Contracting - ein Beitrag zu Klimaschutz, Versorgungssicherheit und Wettbewerb

    Energy Technology Data Exchange (ETDEWEB)

    Quint, R.P. [GASAG WaermeService GmbH, Berlin (Germany)

    2007-08-15

    Contracting is an important trump card when it comes to containing the climate change and improving the security of supply - and a promising business field besides. This is an option that should be used more widely considering the ambitious energy efficiency improvement targets of the European Union and Germany, which are set at 20% and 50% percent over the year 1990, respectively. It is moreover an option that pays off. German tenancy law is in urgent need of a reform to make heat contracting more popular. Furthermore, the modernisation of heating systems through contracting should be placed on a level with modernisation effected by the landlord.

  17. An Optional Instrument for European Insurance Contract Law

    Directory of Open Access Journals (Sweden)

    Helmut Heiss

    2010-08-01

    Full Text Available The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law network, drafting a specific part of the Common Frame of Reference. Having continually worked under the guiding principle that "the law of insurance [in Europe] must be one," it now represents a serious option for providing Europe with a single legal framework for insurance contracts.Despite the European Council's proclamations that the Common Frame of Reference will remain a non-binding instrument, the implementation of one or more optional instruments in the future does not appear to beimprobable considering recent developments. The possibility of anoptional instrument has been expressed more than once by the European Commission in its Action Plan and Communication on European Contract Law. Other indications in favour of an optional instrument include the European Parliament's repeated references to the Common Frame of Reference as providing, at the very least, a model for a futureoptional instrument, as well as the EESC's earlier proposal of anoptional instrument as an alternative to standardising insurancecontract law. The preparation by the EESC of another (own-initiative opinion on European contract law is underway, and its presentation is anticipated in 2010. Hence, the optional instrument is evidently the subject of serious political deliberation. Using Article 1:102, the Principles of European Insurance Contract Law represent a prototype for such an instrument.

  18. An Optional Instrument for European Insurance Contract Law

    Directory of Open Access Journals (Sweden)

    Mandeep Lakhan

    2010-08-01

    Full Text Available The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law network, drafting a specific part of the Common Frame of Reference. Having continually worked under the guiding principle that "the law of insurance [in Europe] must be one," it now represents a serious option for providing Europe with a single legal framework for insurance contracts. Despite the European Council's proclamations that the Common Frame of Reference will remain a non-binding instrument, the implementation of one or more optional instruments in the future does not appear to beimprobable considering recent developments. The possibility of anoptional instrument has been expressed more than once by the European Commission in its Action Plan and Communication on European Contract Law. Other indications in favour of an optional instrument include the European Parliament's repeated references to the Common Frame of Reference as providing, at the very least, a model for a futureoptional instrument, as well as the EESC's earlier proposal of anoptional instrument as an alternative to standardising insurancecontract law. The preparation by the EESC of another (own-initiative opinion on European contract law is underway, and its presentation is anticipated in 2010. Hence, the optional instrument is evidently the subject of serious political deliberation. Using Article 1:102, the Principles of European Insurance Contract Law represent a prototype for such an instrument.

  19. Energy Programs at the Johns Hopkins University Applied Physics Laboratory, Quarterly Report, January-March 1980

    Energy Technology Data Exchange (ETDEWEB)

    Entingh, Daniel J.

    1980-03-01

    The Johns Hopkins University Applied Physics Laboratory, under contracts with several agencies of the federal government and an agency of the State of Maryland, is engaged in developing energy resources, utilization concepts, and monitoring and storage methods. This Quarterly Report summarizes the work on the various tasks as of 31 March 1980. The Energy Quarterly Report is divided into four sections. The first, Geothermal Energy Development Planning and Technical Assistance, supported by the Department of Energy/Division of Geothermal Energy (DOE/DGE), contains reports on the progress of geothermal-related tasks on which effort was concentrated during the quarter. The second section, Operational Research, Hydroelectric Power Development, supported by the Department of Energy/Resource Applications (DOE/DGE), contains reports on small-scale hydroelectric investigations in the southeastern states. The third section, Seismotectonic Investigation, supported by the Reactor Safety Research Division of the Nuclear Regulatory Commission, reports on a neotectonic investigation in Connecticut. The fourth section, Energy Conversion and Storage Techniques, contains two articles, the first on OTEC core unit testing supported by the Department of Energy/Division of Central Solar Technology (DOE/CST), and the second on an analysis of the Community Annual Storage Energy System at the U.S. Naval Air Station, Norfolk, Va. This work is supported by the Department of Energy and the Department of Defense, Naval Facilities Engineering Command/Atlantic Division.

  20. Energy Programs at the Johns Hopkins University Applied Physics Laboratory, Quarterly Report, April-June 1980

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-06-01

    The Johns Hopkins University Applied Physics Laboratory, under contracts with several agencies of the federal government and an agency of the State of Maryland, is engaged in developing energy resources, utilization concepts, and monitoring and storage methods. This Quarterly Report summarizes the work on the various tasks as of 30 June 1980. The Energy Quarterly Report is divided into three sections. The first, Geothermal Energy Development Planning and Technical Assistance, supported by the Department of Energy/Division of Geothermal Energy (DOE/DGE), contains reports on the progress of geothermal-related tasks on which effort was concentrated during the quarter. The second section, Operational Research, Hydroelectric Power Development, supported by the Department of Energy/Resource Applications (DOE/RA), contains reports on small-scale hydroelectric investigations in the southeastern states. The third section, Energy Conversion and Storage Techniques, contains three articles. The first is on data analysis of OTEC core unit condenser tests, and is supported by the Department of Energy/Division of Central Solar Technology (DOE/CST). The second is on the current status of the Community Annual Storage Energy System at the U.S. Naval Air Station, Norfolk, Va., and is supported by the Department of Energy and the Department of Defense, Naval Facilities Engineering Command/Atlantic Division. The third is on utilization of landfill methane and is supported by Argonne National Laboratory.

  1. 76 FR 53719 - Nondisplacement of Qualified Workers Under Service Contracts

    Science.gov (United States)

    2011-08-29

    .... Subpart A--General Executive Order 13495 does not establish wage or fringe benefit rates. The minimum wage... misplaced. As noted, the SCA establishes the minimum wage rates and fringe benefits to be paid to service employees on a contract for services. These minimum wage rates and fringe benefits can result from the SCA...

  2. LABORATORY DIRECTED RESEARCH AND DEVELOPMENT ANNUAL REPORT TO THE DEPARTMENT OF ENERGY - DECEMBER 2006

    Energy Technology Data Exchange (ETDEWEB)

    FOX, K.J.

    2006-12-31

    Brookhaven National Laboratory (BNL) is a multidisciplinary laboratory that carries out basic and applied research in the physical, biomedical, and environmental sciences, and in selected energy technologies. It is managed by Brookhaven Science Associates, LLC, (BSA) under contract with the U. S. Department of Energy (DOE). BNL's total annual budget has averaged about $460 million. There are about 2,500 employees, and another 4,500 guest scientists and students who come each year to use the Laboratory's facilities and work with the staff. The BNL Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) annually in March, as required by DOE Order 413.2B, ''Laboratory Directed Research and Development,'' April 19, 2006, and the Roles, Responsibilities, and Guidelines for Laboratory Directed Research and Development at the Department of Energy National Nuclear Security Administration Laboratories dated June 13, 2006. In accordance this is our Annual Report in which we describe the Purpose, Approach, Technical Progress and Results, and Specific Accomplishments of all LDRD projects that received funding during Fiscal Year 2006.

  3. Transportation Energy Data Book, Edition 18

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Stacy C.

    1998-09-01

    The Transportation Energy Data Book: Edition 18 is a statistical compendium prepared and published by Oak Ridge National Laboratory (ORNL) under contract with the Office of Transportation Technologies in the Department of Energy (DOE). Designed for use as a desk-top reference, the data book represents an assembly and display of statistics and information that characterize transportation activity, and presents data on other factors that influence transportation energy use. The purpose of this document is to present relevant statistical data in the form of tables and graphs. This edition of the Data Book has 11 chapters which focus on various aspects of the transportation industry. Chapter 1 focuses on petroleum; Chapter 2 - energy Chapter 3 - emissions; Chapter 4 - transportation and the economy; Chapter 5 - highway vehicles; Chapter 6 - Light vehicles; Chapter 7 - heavy vehicles; Chapter 8 - alternative fuel vehicles; Chapter 9 - fleet vehicles; Chapter 10 - household vehicles; and Chapter 11 - nonhighway modes. The sources used represent the latest available data.

  4. DOE standard: Firearms safety

    International Nuclear Information System (INIS)

    1996-02-01

    Information in this document is applicable to all DOE facilities, elements, and contractors engaged in work that requires the use of firearms as provided by law or contract. The standard in this document provides principles and practices for implementing a safe and effective firearms safety program for protective forces and for non-security use of firearms. This document describes acceptable interpretations and methods for meeting Order requirements

  5. DOE standard: Firearms safety

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    Information in this document is applicable to all DOE facilities, elements, and contractors engaged in work that requires the use of firearms as provided by law or contract. The standard in this document provides principles and practices for implementing a safe and effective firearms safety program for protective forces and for non-security use of firearms. This document describes acceptable interpretations and methods for meeting Order requirements.

  6. Experimental program to stimulate competitive energy research in North Dakota: Summary and significance of DOE Trainee research

    Energy Technology Data Exchange (ETDEWEB)

    Boudjouk, Philip

    1999-07-01

    The general goals of the North Dakota DOE/EPSCoR Program are to enhance the capabilities of North Dakota's researchers to conduct nationally competitive energy-related research and to develop science and engineering human resources to meet current and future needs in energy-related areas. Doctoral students were trained and energy research was conducted.

  7. Draft and final Supplemental Environmental Impact Report for the proposed renewal of the contract between the United States Department of Energy and the Regents of the University of California for operation and management of the Lawrence berkeley Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    This Supplemental Environmental Impact Report (SEIR) has been prepared in conformance with the California Environmental Quality Act (CEQA) and the University of California Procedures for the Implementation of CEQA (UC Procedures) to evaluate the potential environmental impacts associated with the University of California`s operation of the Lawrence Berkeley Laboratory (LBL) for the next five years. The specific project under consideration in this SEIR is the renewal of a five-year contract between the University and the United States Department of Energy (DOE) to manage and operate the Lawrence Berkeley Laboratory. As the California agency responsible for carrying out the proposed project, the University is the lead agency responsible for CEQA compliance. Environmental impacts, mitigation, and a site overview are presented.

  8. Draft and final Supplemental Environmental Impact Report for the proposed renewal of the contract between the United States Department of Energy and the Regents of the University of California for operation and management of the Lawrence berkeley Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    This Supplemental Environmental Impact Report (SEIR) has been prepared in conformance with the California Environmental Quality Act (CEQA) and the University of California Procedures for the Implementation of CEQA (UC Procedures) to evaluate the potential environmental impacts associated with the University of California's operation of the Lawrence Berkeley Laboratory (LBL) for the next five years. The specific project under consideration in this SEIR is the renewal of a five-year contract between the University and the United States Department of Energy (DOE) to manage and operate the Lawrence Berkeley Laboratory. As the California agency responsible for carrying out the proposed project, the University is the lead agency responsible for CEQA compliance. Environmental impacts, mitigation, and a site overview are presented.

  9. Environmental Cost Analysis System (ECAS) Status and Compliance Requirements for EM Consolidated Business Center Contracts - 13204

    International Nuclear Information System (INIS)

    Sanford, P.C.; Moe, M.A.; Hombach, W.G.; Urdangaray, R.

    2013-01-01

    The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reporting tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)

  10. Environmental Cost Analysis System (ECAS) Status and Compliance Requirements for EM Consolidated Business Center Contracts - 13204

    Energy Technology Data Exchange (ETDEWEB)

    Sanford, P.C. [Consultant, 11221 E. Cimmarron Dr., Englewood, CO 80111 (United States); Moe, M.A. [EMCBC Office of Cost Estimating and Analysis, United States Department of Energy, 250 E. 5th Street, Suite 500, Cincinnati, OH 45202 (United States); Hombach, W.G. [Team Analysis, Inc., 2 Cardinal Park Drive, Suite 105A, Leesburg, VA 20175 (United States); Urdangaray, R. [Project Performance Corporation, 1760 Old Meadow Road, McLean, VA 22102 (United States)

    2013-07-01

    The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reporting tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)

  11. DEPARTMENT OF ENERGY (DOE) MANAGEMENT OF THE HANFORD WASTE TREATMENT and IMMOBILIZATION PLANT

    International Nuclear Information System (INIS)

    SHRADER, T.A.

    2005-01-01

    The US Department of Energy Office of River Protection is currently overseeing the construction of the new Hanford Site Waste Treatment and Immobilization Plant (more commonly referred to as the Waste Treatment Plant). In December 2000, a contract was awarded to Bechtel National, Inc. for the design, construction, and commissioning of the $5.8 billion facility to treat and vitrify a significant portion of the waste currently stored in large underground tanks on the Hanford Site. As the owner, the Office of River Protection has developed an organization to oversee the design, construction, and commissioning of the facility. A Federal Project Director is responsible for all aspects of the project, including safety, design, construction, commissioning; and the baseline (scope, cost, and schedule). The Project Director reports to the Manager of the Office of River Protection and recommends changes to the contract requirements, safety basis documents, or the baseline. Approximately 30 engineers, scientists, and other support personnel have been assigned to a unique organization that supports the Federal Project Director in providing oversight of each phase of the project (i.e., design, construction, and commissioning). The organization includes an Engineering Division, a Programs and Projects Division, a Safety Authorization Basis Team, and an Operations and Commissioning Team. This organization is unique within the Department of Energy and provides a focused team to resolve issues of safety, cost, schedule, technical design changes, and construction. This paper will describe this team and show how the Office of River Protection utilizes this oversight team to manage this complex, accelerated project. The size and technical complexity of the facility poses unique challenges for safety, permitting, commissioning, engineering, and baseline control. A robust training and qualification program has been developed that will insure the Departmental personnel working closely

  12. Uranium enrichment conference on modified contract option, Oak Ridge, Tennessee, July 22, 1975

    International Nuclear Information System (INIS)

    1975-01-01

    The questions and answers presented in this document originated at an industry-wide meeting sponsored by the Energy Research and Development Administration held in Oak Ridge, Tennessee, on July 22, 1975, to discuss features and provisions of an ERDA plan to adjust contracts held by firms receiving uranium enriching services from ERDA. On June 19, 1975, ERDA announced terms of an expanded contract modification plan. The modified contract option broadened a previous plan proposed on January 15, 1975, by the former Atomic Energy Commission. The meeting in Oak Ridge on July 22, 1975, was designed to provide additional information on the expanded contract option and to offer ample opportunity for questions and answers prior to August 18, 1975, by which time enriching services customers who chose the one-time option had to so notify ERDA. The meeting included presentations by officials of ERDA Headquarters and ERDA's Oak Ridge Operations on the features of the contract adjustment offer, including provisions for contract termination in whole, separative work schedule adjustments, and uranium feed delivery schedule relaxation. (auth)

  13. Institutional support for the Utah Consortium for Energy Research and Education. Annual report

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The Utah Consortium for Energy Research and Education is made up of three colleges and universities in Utah. The scope of the Consortium plan is the marshalling of the academic research resources, as well as the appropriate non-academic resources within Utah to pursue, as appropriate, energy-related research activities. The heart of this effort has been the institutional contract between DOE and the University of Utah, acting as fiscal agent for the Consortium. Sixteen programs are currently being funded, but only ten of the projects are described in this report. Three projects are on fission/fusion; three on environment and safety; four on fossil energy; three on basic energy sciences; one each on conservation, geothermal, and solar.

  14. DOE Standard: Fire protection design criteria

    International Nuclear Information System (INIS)

    1999-07-01

    The development of this Standard reflects the fact that national consensus standards and other design criteria do not comprehensively or, in some cases, adequately address fire protection issues at DOE facilities. This Standard provides supplemental fire protection guidance applicable to the design and construction of DOE facilities and site features (such as water distribution systems) that are also provided for fire protection. It is intended to be used in conjunction with the applicable building code, National Fire Protection Association (NFPA) Codes and Standards, and any other applicable DOE construction criteria. This Standard replaces certain mandatory fire protection requirements that were formerly in DOE 5480.7A, ''Fire Protection'', and DOE 6430.1A, ''General Design Criteria''. It also contains the fire protection guidelines from two (now canceled) draft standards: ''Glove Box Fire Protection'' and ''Filter Plenum Fire Protection''. (Note: This Standard does not supersede the requirements of DOE 5480.7A and DOE 6430.1A where these DOE Orders are currently applicable under existing contracts.) This Standard, along with the criteria delineated in Section 3, constitutes the basic criteria for satisfying DOE fire and life safety objectives for the design and construction or renovation of DOE facilities

  15. Implantable power generation system utilizing muscle contractions excited by electrical stimulation.

    Science.gov (United States)

    Sahara, Genta; Hijikata, Wataru; Tomioka, Kota; Shinshi, Tadahiko

    2016-06-01

    An implantable power generation system driven by muscle contractions for supplying power to active implantable medical devices, such as pacemakers and neurostimulators, is proposed. In this system, a muscle is intentionally contracted by an electrical stimulation in accordance with the demands of the active implantable medical device for electrical power. The proposed system, which comprises a small electromagnetic induction generator, electrodes with an electrical circuit for stimulation and a transmission device to convert the linear motion of the muscle contractions into rotational motion for the magneto rotor, generates electrical energy. In an ex vivo demonstration using the gastrocnemius muscle of a toad, which was 28 mm in length and weighed 1.3 g, the electrical energy generated by the prototype exceeded the energy consumed for electrical stimulation, with the net power being 111 µW. It was demonstrated that the proposed implantable power generation system has the potential to replace implantable batteries for active implantable medical devices. © IMechE 2016.

  16. DOE Zero Energy Ready Home Case Study: Amaris Custom Homes, St. Paul, Minnesota

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-06-01

    For this project, Amaris worked with U.S. Department of Energy (DOE) team, NorthernSTAR Building America Partnership, to develop the first Zero Energy Ready Home (ZERH) in Minnesota's cold climate using reasonable, cost-effective, and replicable construction materials and practices. The result is a passive solar, super-efficient 3542-ft2 walkout ranch-style home with all the creature comforts. Along with meeting ZERH standards, Amaris also achieved certifications for Leadership in Energy & Environmental Design for Homes v4, MN Green Path Emerald, and a Builders Association of the Twin Cities Reggie Award of Excellence. The home achieves a HERS score of 41 without photovoltaics; with PV, the home achieves a HERS score of 5.

  17. Standard form contracts and a smart contract future

    Directory of Open Access Journals (Sweden)

    Kristin B. Cornelius

    2018-05-01

    Full Text Available With a budding market of widespread smart contract implementation on the horizon, there is much conversation about how to regulate this new technology. Discourse on standard form contracts (SFCs and how they have been adopted in a digital environment is useful toward predicting how smart contracts might be interpreted. This essay provides a critical review of the discourse surrounding digitised SFCs and applies it to issues in smart contract regulation. An exploration of the literature surrounding specific instances SFCs finds that it lacks a close examination of the textual and documentary aspects of SFCs, which are particularly important in a digital environment as a shift in medium prompts a different procedural process. Instead, common perspectives are either based on outdated notions of paper versions of these contracts or on ideologies of industry and business that do not sufficiently address the needs of consumers/users in the digital age. Most importantly, noting the failure of contract law to address the inequities of SFCs in this environment can help prevent them from being codified further with smart contracts.

  18. Linkages from DOE's Solar Photovoltaic R&D to Commercial Renewable Power from Solar Energy

    Energy Technology Data Exchange (ETDEWEB)

    Ruegg, Rosalie [TIA Consulting Inc., Emerald Isle, NC (United States); Thomas, Patrick [1790 Analytics LLC., Haddonfield, NJ (United States)

    2011-04-01

    DOE's Solar Photovoltaic R&D Subprogram promotes the development of cost-effective systems for directly converting solar energy into electricity for residential, commercial, and industrial applications. This study was commissioned to assess the extent to which the knowledge outputs of R&D funded by the DOE Solar PV subprogram are linked to downstream developments in commercial renewable power. A second purpose was to identify spillovers of the resulting knowledge to other areas of application. A third purpose was to lend support to a parallel benefit-cost study by contributing evidence of attribution of benefits to DOE.

  19. The impact of two Department of Energy orders on the design and cost of select plutonium facilities at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Rey, V.C.

    1999-01-01

    The Los Alamos National Laboratory (LANL) is a research and development facility in northern New Mexico, owned by the federal government and operated for the US Department of Energy (DOE) by the University of California (UC). LANL conducts research and experiments in many arenas including plutonium. Its plutonium facilities are required to meet the facility design and safety criteria of applicable DOE orders as specified in the UC contract. Although DOE 420.1, Facility Safety, superseded DOE 6430.1A, General Design Criteria, the UC contract requires LANL to adhere to DOE 6430.1A, Division 13 in its special nuclear facilities. A comparison of costs and savings relative to installation of double-wall piping at two LANL plutonium facilities is demonstrated. DOE 6430.1A is prescriptive in its design criteria whereas DOE 420.1 is a performance-based directive. The differences in these orders impact time and design costs in nuclear construction projects. LANL's approach to integrated quality and conduct of operations for design, needs to be re-evaluated. In conclusion, there is a need for highly-technical, knowledgeable people and an integrated, quality/conduct of operations-based approach to assure that nuclear facilities are designed and constructed in a safe and cost-effective manner

  20. Contract 98 Self-Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This report documents the results of LBL`s Self-Assessment required by Appendix F to Contract DE ACOO3765F00098. This self assessment covers the performance measures set forth in Appendix F except those requiring an external audit. The performance measures for LBL are in the areas of ES&H Finance, Human Services and Procurement and Property. LBL is a multi-program laboratory operated by the University of California (UC) for DOE. The mission of LBL includes performing research in energy, general, and life sciences. LBL facilities include the main site on 130 acres located in the cities of Berkeley and Oakland; laboratories and offices located in buildings on the UC Berkeley Campus; and three leased buildings in the cities of Berkeley and Emeryville. 1. Involvement of Line Management in the assessment process to provide awareness and ownership. 2. Using existing assessments, audits and appraisals in lieu of a new assessment wherever possible. 3. Conduct of the assessments by individuals with functional responsibility and knowledge of the areas being assessed. 4. Interaction with individuals performing assessments at other Laboratories to enhance our learning process. As anticipated, a number of findings will require corrective action. General corrective actions are identified for key findings in this report. In early May 1993, this Laboratory will begin the development of detailed formal corrective action plans which will be entered into a laboratory automated corrective action tracking system.

  1. Transition report, United States Department of Energy: A report to the President-Elect. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1988-11-01

    This report is a description of the Department of Energy organization and projects. The topics of the report include: (1) DOE organization and overview; (2) Headquarters Offices: Congressional, Intergovernmental and Public Affairs; Conservation and Renewable Energy; Contract Appeals; Defense Programs; Economic Regulatory Administration; Energy Information Administration; Energy Research; Environment, Safety and Health; Fossil Energy; General Counsel; Hearings and Appeals; Inspector General; International Affairs and Energy Emergencies; Management and Administration; Minority Economic Impact; New Production Reactors; Nuclear Energy; Policy, Planning and Analysis; Radioactive Waste Management; (3) Operations Offices: Albuquerque Operations Office; Chicago Operations Office; Idaho Operations Office; Nevada Operations Office; Oak Ridge Operations Office; Richland Operations Office; San Francisco Operations Office; Savannah River Operations Office; Laboratories; and (4) Power Administrations: Bonneville Power Administration; Western Area Power Administration.

  2. 10 CFR 1021.200 - DOE planning.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false DOE planning. 1021.200 Section 1021.200 Energy DEPARTMENT... Decisionmaking § 1021.200 DOE planning. (a) DOE shall provide for adequate and timely NEPA review of DOE... accordance with 40 CFR 1501.2 and this section. In its planning for each proposal, DOE shall include adequate...

  3. Long-Term Stewardship At DOE's Hanford Site - 12575

    International Nuclear Information System (INIS)

    Moren, R.J.; Grindstaff, K.D.

    2012-01-01

    The U.S. Department of Energy's (DOE) Hanford Site is located in southeast Washington and consists of 1,518 square kilometers (586 square miles) of land. Established in 1943 as part of the Manhattan Project, Hanford workers produced plutonium for our nation's nuclear defense program until the mid 1980's. Since then, the site has been in cleanup mode that is being accomplished in phases. As we achieve remedial objectives and complete active cleanup, DOE will manage Hanford land under the Long-Term Stewardship (LTS) Program until completion of cleanup and the site becomes ready for transfer to the post cleanup landlord - currently planned for DOE's Office of Legacy Management (LM). We define Hanford's LTS Program in the ''Hanford Long-Term Stewardship Program Plan,'' (DOE/RL-201 0-35)(1), which describes the scope including the relationship between the cleanup projects and the LTS Program. DOE designed the LTS Program to manage and provide surveillance and maintenance (S and M) of institutional controls and associated monitoring of closed waste sites to ensure the protection of human health and the environment. DOE's Richland Operations Office (DOE-RL) and Hanford cleanup and operations contractors collaboratively developed this program over several years. The program's scope also includes 15 key activities that are identified in the DOE Program Plan (DOE/RL-2010-35). The LTS Program will transition 14 land segments through 2016. The combined land mass is approximately 570 square kilometers (220 square miles), with over 1,300 active and inactive waste sites and 3,363 wells. Land segments vary from buffer zone property with no known contamination to cocooned reactor buildings, demolished support facilities, and remediated cribs and trenches. DOE-RL will transition land management responsibilities from cleanup contractors to the Mission Support Contract (MSC), who will then administer the LTS Program for DOE-RL. This process requires an environment of cooperation

  4. Electricity contract choices of Finnish residential customers. A choice based conjoint analysis

    Energy Technology Data Exchange (ETDEWEB)

    Rouvinen, S.; Matero, J. (Univ. of Eastern Finland, Joensuu (Finland), School of Forest Sciences), e-mail: seppo.rouvinen@uef.fi, e-mail: jukka.matero@uef.fi

    2010-07-01

    Our aim is to examine how different environmental attributes of electricity contracts affect the residential customer choices when heterogeneity in customer preferences and motivations is taken into account. The data was acquired by a mail questionnaire to random sample of Finnish people in October-November 2009 with a response rate of 38 %. In addition to conventional questions, like questions on socio-demographic and agreements of energy related statements, the discrete choice experiment (DCE) of electricity contracts was included. The choice sets in the DCE had three electricity contract alternatives with varying levels of predetermined attributes (including unit price, supplier type, frequency of power outages, energy source and CO{sub 2} emissions). In this paper, we present the findings of our DCE design. Modeling respondent choices resulted in implicit prices for various electricity contract attributes that provide guidance for green marketing strategies of electricity suppliers and energy related informational activities of public institutions. We conclude that currently the potential for increasing demand-based environmental competitiveness from the wood electricity differentiation remains limited as we did not find any significant market segment of residential customers with strong preferences for wood over other sources of electricity (including 'mixture'). (orig.)

  5. Does mental exertion alter maximal muscle activation?

    Directory of Open Access Journals (Sweden)

    Vianney eRozand

    2014-09-01

    Full Text Available Mental exertion is known to impair endurance performance, but its effects on neuromuscular function remain unclear. The purpose of this study was to test the hypothesis that mental exertion reduces torque and muscle activation during intermittent maximal voluntary contractions of the knee extensors. Ten subjects performed in a randomized order three separate mental exertion conditions lasting 27 minutes each: i high mental exertion (incongruent Stroop task, ii moderate mental exertion (congruent Stroop task, iii low mental exertion (watching a movie. In each condition, mental exertion was combined with ten intermittent maximal voluntary contractions of the knee extensor muscles (one maximal voluntary contraction every 3 minutes. Neuromuscular function was assessed using electrical nerve stimulation. Maximal voluntary torque, maximal muscle activation and other neuromuscular parameters were similar across mental exertion conditions and did not change over time. These findings suggest that mental exertion does not affect neuromuscular function during intermittent maximal voluntary contractions of the knee extensors.

  6. Technical progress report, Contracts DE-AC02-81ER40014, 40015 and 40016

    International Nuclear Information System (INIS)

    1981-01-01

    This Progress Report summarizes work carried out at the Nuclear Physics Laboratory of the University of Colorado from November 1, 1980 through July 31, 1981, under contracts between the University of Colorado and the United States Department of Energy. The shorter report period of nine months is due to a change to an earlier submission date this year for our proposal for support to begin February 1, 1982. Cyclotron operation, research, and development have been supported under contract DE-AC02-81ER40014. The AVF cyclotron has continued to provide reliable and versatile beams of protons, deuterons, 3 He and 4 He. A wide variety of research results in direct reactions, nuclear structure, and compound reaction mechanisms can be noted in this Progress Report, correlated in many cases to current problems in intermediate energy physics. Theoretical work on nuclear reactions, carried out under contract DE-AC02-81ER40015, has been well matched to our experimental programs in low and intermediate energy physics. One important result has been the recasting of the DWBA in an eikonal expansion suited to high energy reactions. Our efforts in intermediate energy physics, under contract DE-AC02-81ER40016, have emphasized pion scattering studies at LAMPF and TRIUMF and proton induced charge exchange reactions at IUCF. Data for an important test of hadronic charge symmetry have been completed at two energies, using elastic pion-deuteron scattering

  7. Energy efficiency assessment methods and tools evaluation. Bolling Air Force Base. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    McMordie, K.L.; Richman, E.E.; Keller, J.M.; Dixon, D.R.

    1995-05-01

    The goal of the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) is to facilitate energy-efficiency improvements at federal facilities. This is accomplished by a balanced program of technology development, facility assessment, and use of cost-sharing procurement mechanisms. Technology development focuses upon the tools, software, and procedures used to identify and evaluate energy-efficiency technologies and improvements. For facility assessment, FEMP provides metering equipment and trained analysts to federal agencies exhibiting a commitment to improve energy use efficiency. To assist in procurement of energy-efficiency measures, FEMP helps federal agencies devise and implement performance contracting and utility demand-side management strategies. Pacific Northwest Laboratory (PNL) supports the FEMP mission of energy systems modernization. Under this charter, the Laboratory and its contractors work with federal facility energy managers to assess and implement energy-efficiency improvements at federal facilities nationwide.

  8. 41 CFR 102-75.320 - Does appraisal information need to be kept confidential?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Does appraisal information need to be kept confidential? 102-75.320 Section 102-75.320 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 75-REAL PROPERTY DISPOSAL Surplus Real...

  9. DOE technical standards list. Department of Energy standards index

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This document was prepared for use by personnel involved in the selection and use of DOE technical standards and other Government and non-Government standards. This TSL provides listing of current DOE technical standards, non-Government standards that have been adopted by DOE, other Government documents in which DOE has a recorded interest, and canceled DOE technical standards. Information on new DOE technical standards projects, technical standards released for coordination, recently published DOE technical standards, and activities of non-Government standards bodies that may be of interest to DOE is published monthly in Standards Actions.

  10. Development and implementation of information systems for the DOE's National Analytical Management Program (NAMP)

    International Nuclear Information System (INIS)

    Streets, W. E.

    1999-01-01

    The Department of Energy (DOE) faces a challenging environmental management effort, including environmental protection, environmental restoration, waste management, and decommissioning. This effort requires extensive sampling and analysis to determine the type and level of contamination and the appropriate technology for cleanup, and to verify compliance with environmental regulations. Data obtained from these sampling and analysis activities are used to support environmental management decisions. Confidence in the data is critical, having legal, regulatory, and therefore, economic impact. To promote quality in the planning, management, and performance of these sampling and analysis operations, DOE's Office of Environmental Management (EM) has established the National Analytical Management Program (NAMP). With a focus on reducing the estimated costs of over $200M per year for EM's analytical services, NAMP has been charged with developing products that will decrease the costs for DOE complex-wide environmental management while maintaining quality in all aspects of the analytical data generation. As part of this thrust to streamline operations, NAMP is developing centralized information systems that will allow DOE complex personnel to share information about EM contacts at the various sites, pertinent methodologies for environmental restoration and waste management, costs of analyses, and performance of contracted laboratories

  11. Contract Award Decisions Resulting in Contract Termination for Default

    National Research Council Canada - National Science Library

    1996-01-01

    .... Specifically, the audit focused on contracts terminated either for default or convenience and determined whether the contract terminations could have been averted based on information available before contract award...

  12. Radiation exposures for DOE and DOE contractor employees, 1987

    International Nuclear Information System (INIS)

    1989-10-01

    This report is one of series of annual reports provided by the US Department of Energy (DOE) summarizing occupational radiation exposures received by DOE and DOE contractor employees. These reports provide an overview of radiation exposures received each year, as well as identification of trends in exposures being experienced over the years. 5 figs., 30 tabs

  13. ELECTRON ACCELERATION IN CONTRACTING MAGNETIC ISLANDS DURING SOLAR FLARES

    Energy Technology Data Exchange (ETDEWEB)

    Borovikov, D.; Tenishev, V.; Gombosi, T. I. [University of Michigan, Department of Climate and Space Sciences and Engineering, 2455 Hayward Street, Ann Arbor, MI 48104-2143 (United States); Guidoni, S. E. [The Catholic University of America, 620 Michigan Avenue Northeast, Washington, DC 20064 (United States); DeVore, C. R.; Karpen, J. T.; Antiochos, S. K. [Heliophysics Science Division, NASA Goddard Space Flight Center, Greenbelt, MD 20771 (United States)

    2017-01-20

    Electron acceleration in solar flares is well known to be efficient at generating energetic particles that produce the observed bremsstrahlung X-ray spectra. One mechanism proposed to explain the observations is electron acceleration within contracting magnetic islands formed by magnetic reconnection in the flare current sheet. In a previous study, a numerical magnetohydrodynamic simulation of an eruptive solar flare was analyzed to estimate the associated electron acceleration due to island contraction. That analysis used a simple analytical model for the island structure and assumed conservation of the adiabatic invariants of particle motion. In this paper, we perform the first-ever rigorous integration of the guiding-center orbits of electrons in a modeled flare. An initially isotropic distribution of particles is seeded in a contracting island from the simulated eruption, and the subsequent evolution of these particles is followed using guiding-center theory. We find that the distribution function becomes increasingly anisotropic over time as the electrons’ energy increases by up to a factor of five, in general agreement with the previous study. In addition, we show that the energized particles are concentrated on the Sunward side of the island, adjacent to the reconnection X-point in the flare current sheet. Furthermore, our analysis demonstrates that the electron energy gain is dominated by betatron acceleration in the compressed, strengthened magnetic field of the contracting island. Fermi acceleration by the shortened field lines of the island also contributes to the energy gain, but it is less effective than the betatron process.

  14. Does the Equivalence between Gravitational Mass and Energy Survive for a Quantum Body?

    Directory of Open Access Journals (Sweden)

    Lebed A. G.

    2012-10-01

    Full Text Available We consider the simplest quantum composite body, a hydrogen atom, in the presence of a weak external gravitational field. We show that passive gravitational mass operator of the atom in the post-Newtonian approximation of general relativity does not commute with its energy operator, taken in the absence of the field. Nevertheless, the equivalence between the expectations values of passive gravitational mass and energy is shown to survive at a macroscopic level for stationary quantum states. Breakdown of the equiva- lence between passive gravitational mass and energy at a microscopic level for station- ary quantum states can be experimentally detected by studying unusual electromagnetic radiation, emitted by the atoms, supported and moved in the Earth gravitational field with constant velocity, using spacecraft or satellite.

  15. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  16. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  17. 75 FR 2133 - Construction and Operation of the Quartzsite Solar Energy Project, La Paz County, AZ (DOE/EIS-0440)

    Science.gov (United States)

    2010-01-14

    ... Quartzsite Solar Energy Project, La Paz County, AZ (DOE/EIS-0440) AGENCY: Western Area Power Administration... proposed Quartzsite Solar Energy Project (Project) in La Paz County, near Quartzsite, Arizona. Quartzsite Solar Energy, LLC (QSE) has applied to Western to interconnect the proposed Project to Western's power...

  18. Relativistic beam self-contraction in the inhomogeneous magnetic field with a neck

    International Nuclear Information System (INIS)

    Grishin, V.K.

    1979-01-01

    For production of short bunches of relativistic electrons and accompanying electromagnetic fields with amplitudes (up to MW/cm), considered was self-contraction of a relativistic electron beam (REB) in a magnetic field with a neck. REB dynamics in a ferrodielectric channel with permeability >> 1 was considered as well. It is shown, that in a such system, 10 m beam with a current up to ten kA is contracted to a length of approximately 0.5 m. Also the possible ways of application of the considered method of REB contraction are shown. For instance, a slow REB, fearing a great field, can be used for the capture and subsequent acceleration of heavy ions. The contracted beam application for generating powerful pulses of a h.f. field with, in fact, a homogeneous spectrum up to 100-300 MHz and total field energy up to 10-15% of initial beam energy is of great interest as well

  19. Energetic aspects of skeletal muscle contraction: implications of fiber types.

    Science.gov (United States)

    Rall, J A

    1985-01-01

    In this chapter fundamental energetic properties of skeletal muscles as elucidated from isolated muscle preparations are described. Implications of these intrinsic properties for the energetic characterization of different fiber types and for the understanding of locomotion have been considered. Emphasis was placed on the myriad of physical and chemical techniques that can be employed to understand muscle energetics and on the interrelationship of results from different techniques. The anaerobic initial processes which liberate energy during contraction and relaxation are discussed in detail. The high-energy phosphate (approximately P) utilized during contraction and relaxation can be distributed between actomyosin ATPase or cross-bridge cycling (70%) and the Ca2+ ATPase of the sacroplasmic reticulum (30%). Muscle shortening increases the rate of approximately P hydrolysis, and stretching a muscle during contraction suppresses the rate of approximately P hydrolysis. The economy of an isometric contraction is defined as the ratio of isometric mechanical response to energetic cost and is shown to be a fundamental intrinsic parameter describing muscle energetics. Economy of contraction varies across the animal kingdom by over three orders of magnitude and is different in different mammalian fiber types. In mammalian skeletal muscles differences in economy of contraction can be attributed mainly to differences in the specific actomyosin and Ca2+ ATPase of muscles. Furthermore, there is an inverse relationship between economy of contraction and maximum velocity of muscle shortening (Vmax) and maximum power output. This is a fundamental relationship. Muscles cannot be economical at developing and maintaining force and also exhibit rapid shortening. Interestingly, there appears to be a subtle system of unknown nature that modulates the Vmax and economy of contraction. Efficiency of a work-producing contraction is defined and contrasted to the economy of contraction

  20. Psychological contracts: a new strategy for retaining reduced-hour physicians.

    Science.gov (United States)

    Hartwell, Jennifer K

    2010-01-01

    As a retention strategy, healthcare organizations offer reduced-hour schedules to physicians seeking better work-family balance. However, this quantitative study of 94 full-time and reduced-hour female physicians in the Boston area found that working fewer hours helps physicians achieve better balance but does not improve their burnout or career satisfaction, or impact their intention to quit or leave the field of medicine. Instead, the findings demonstrate that psychological contract fulfillment, which reflects the subjective nature of the employment relationship, is more important than work hours, an objective job condition, in predicting intention to quit and these other outcomes. A fine-grained analysis is initiated uncovering the multidimensionality of the psychological contract construct. To integrate successful reduced-hour arrangements for physicians, medical managers are directed to the importance of understanding the composition of reduced-hour physicians' psychological contracts, specifically, their need to do challenging work, receive high levels of supervisor support, and promotion opportunities.