WorldWideScience

Sample records for energy contingency planning

  1. 10 CFR 72.184 - Safeguards contingency plan.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Safeguards contingency plan. 72.184 Section 72.184 Energy... Protection § 72.184 Safeguards contingency plan. (a) The requirements of the licensee's safeguards contingency plan for responding to threats and radiological sabotage must be as defined in appendix C to part...

  2. Proposed energy conservation contingency plan: emergency restrictions on advertising lighting. Authorities, need, rationale, and operation

    Energy Technology Data Exchange (ETDEWEB)

    1977-04-01

    The emergency restrictions on advertising lighting proposed in Energy Conservation Contingency Plan No. 5 of 1977 are presented. A statement is given on the need for rationale and operation of the Contingency Plan.

  3. Hanford Facility contingency plan

    International Nuclear Information System (INIS)

    Sutton, L.N.; Miskho, A.G.; Brunke, R.C.

    1993-10-01

    The Hanford Facility Contingency Plan, together with each TSD unit-specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. This plan includes descriptions of responses to a nonradiological hazardous materials spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. This plan includes descriptions of responses for spills or releases as a result of transportation activities, movement of materials, packaging, and storage of hazardous materials

  4. Contingency planning: preparation of contingency plans

    DEFF Research Database (Denmark)

    Westergaard, J M

    2008-01-01

    . The risk of introducing disease pathogens into a country and the spread of the agent within a country depends on a number of factors including import controls, movement of animals and animal products and the biosecurity applied by livestock producers. An adequate contingency plan is an important instrument...... in the preparation for and the handling of an epidemic. The legislation of the European Union requires that all Member States draw up a contingency plan which specifies the national measures required to maintain a high level of awareness and preparedness and is to be implemented in the event of disease outbreak...

  5. 30 CFR 282.26 - Contingency Plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Contingency Plan. 282.26 Section 282.26 Mineral... § 282.26 Contingency Plan. (a) When required by the Director, a lessee shall include a Contingency Plan as part of its request for approval of a Delineation, Testing, or Mining Plan. The Contingency Plan...

  6. 49 CFR 1544.301 - Contingency plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Contingency plan. 1544.301 Section 1544.301... COMMERCIAL OPERATORS Threat and Threat Response § 1544.301 Contingency plan. Each aircraft operator must adopt a contingency plan and must: (a) Implement its contingency plan when directed by TSA. (b) Ensure...

  7. Licensee safeguards contingency plans

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The Nuclear Regulatory Commission is amending its regulations to require that licensees authorized to operate a nuclear reactor (other than certain research and test reactors), and those authorized to possess strategic quantities of plutonium, uranium-233, or uranium-235 develop and implement acceptable plans for responding to threats, thefts, and industrial sabotage of licensed nuclear materials and facilities. The plans will provide a structured, orderly, and timely response to safeguards contingencies and will be an important segment of NRC's contingency planning programs. Licensee safeguards contingency plans will result in organizing licensee's safeguards resources in such a way that, in the unlikely event of a safeguards contingency, the responding participants will be identified, their several responsibilities specified, and their responses coordinated

  8. 10 CFR 72.186 - Change to physical security and safeguards contingency plans.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Change to physical security and safeguards contingency... contingency plans. (a) The licensee shall make no change that would decrease the safeguards effectiveness of... licensee safeguards contingency plan without prior approval of the Commission. A licensee desiring to make...

  9. Yampa River Valley sub-area contingency plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    The Yampa River Valley sub-area contingency plan (Contingency Plan) has been prepared for two counties in northwestern Colorado: Moffat County and Routt County. The Contingency Plan is provided in two parts, the Contingency Plan and the Emergency Response Action Plan (ERAP). The Contingency Plan provides information that should be helpful in planning to minimize the impact of an oil spill or hazardous material incident. It contains discussions of planning and response role, hazards identification, vulnerability analysis, risk analysis, cleanup, cost recovery, training, and health and safety. It includes information on the incident command system, notifications, response capabilities, emergency response organizations, evacuation and shelter-in-place, and immediate actions.

  10. 40 CFR 264.53 - Copies of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 264.53... Contingency Plan and Emergency Procedures § 264.53 Copies of contingency plan. A copy of the contingency plan... called upon to provide emergency services. [Comment: The contingency plan must be submitted to the...

  11. Appendix F - Sample Contingency Plan

    Science.gov (United States)

    This sample Contingency Plan in Appendix F is intended to provide examples of contingency planning as a reference when a facility determines that the required secondary containment is impracticable, pursuant to 40 CFR §112.7(d).

  12. 40 CFR 265.53 - Copies of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  13. Network location theory and contingency planning

    Energy Technology Data Exchange (ETDEWEB)

    Hakimi, S L

    1983-08-01

    A brief survey of results in network location theory is first presented. Then, a systems view of contingency planning is described. Finally, some results in location theory are re-examined and it is shown that they are motivated by contingency planning considerations. Some new issues and problems in location theory are described, which, if properly tackled, will have a substantial impact on contingency planning in transportation.

  14. 40 CFR 265.54 - Amendment of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Amendment of contingency plan. 265.54... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.54 Amendment of contingency plan. The contingency plan must be reviewed, and immediately amended, if necessary, whenever: (a) Applicable regulations...

  15. 40 CFR 264.54 - Amendment of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Amendment of contingency plan. 264.54 Section 264.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... Contingency Plan and Emergency Procedures § 264.54 Amendment of contingency plan. The contingency plan must be...

  16. 49 CFR 1542.301 - Contingency plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Contingency plan. 1542.301 Section 1542.301..., DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...

  17. Radiological Contingency Planning for the Mars Science Laboratory Launch

    Energy Technology Data Exchange (ETDEWEB)

    Paul P. Guss

    2008-04-01

    This paper describes the contingency planning for the launch of the Mars Science Laboratory scheduled for the 21-day window beginning on September 15, 2009. National Security Technologies, LLC (NSTec), based in Las Vegas, Nevada, will support the U.S. Department of Energy (DOE) in its role for managing the overall radiological contingency planning support effort. This paper will focus on new technologies that NSTec’s Remote Sensing Laboratory (RSL) is developing to enhance the overall response capability that would be required for a highly unlikely anomaly. This paper presents recent advances in collecting and collating data transmitted from deployed teams and sensors. RSL is responsible to prepare the contingency planning for a range of areas from monitoring and assessment, sample collection and control, contaminated material release criteria, data management, reporting, recording, and even communications. The tools RSL has available to support these efforts will be reported. The data platform RSL will provide shall also be compatible with integration of assets and field data acquired with other DOE, National Space and Aeronautics and Space Administration (NASA), state, and local resources, personnel, and equipment. This paper also outlines the organizational structure for response elements in radiological contingency planning.

  18. Defense plan of Hydro-Quebec for extreme contingencies

    International Nuclear Information System (INIS)

    Trudel, Guilles; Bernard, Serge; Portales, Esteban

    2000-01-01

    In the last years, Hydro-Quebec it undertook an important program to improve the dependability of their net of energy transport. They concentrated the efforts on increasing the capacity of the net resist in the event of carries to an extreme contingency caused in general by multiple incidents or for successive disconnection of the lines of energy transport. To neutralize these contingencies, Hydro-Quebec it adopted a series of special measures that are contained under the general title of Plan of Defense for Extreme Contingencies. The objective of this plan is to detect the incidents that surpass the capacity of the net. It is completely automatic and it is based mainly in: A system of automatic disconnection of generation and tele-shot of loads; A system of automatic maneuver (opening and closing) of inductances shunt of 735 kw; A system of disconnection of loads for low voltage; A system of disconnection of loads for low frequency. The present document summarizes the orientations that there is taking Hydro-Quebec to protect its net in the event of extreme contingencies and it describes the different automatism that they are adopts, in particular the system automatic disconnection of generation and tele-shot of loads (RPTC) that is one of the main components of the defense plan. The system RPTC detects the simultaneous loss of several lines directly in 15 substations of 735 kw. It understands four places of automatic disconnection of generation and a centralized system of tele-shot of loads

  19. 40 CFR 264.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 264.51 Section 264.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 264.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The contingency...

  20. 40 CFR 264.227 - Emergency repairs; contingency plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Emergency repairs; contingency plans... FACILITIES Surface Impoundments § 264.227 Emergency repairs; contingency plans. (a) A surface impoundment... days after detecting the problem. (c) As part of the contingency plan required in subpart D of this...

  1. Developing standardized facility contingency plans

    International Nuclear Information System (INIS)

    Davidson, D.A.

    1993-01-01

    Texaco consists of several operating departments that are, in effect, independent companies. Each of these departments is responsible for complying with all environmental laws and regulations. This includes the preparation by each facility to respond to an oil spill at that location. For larger spills, however, management of the response will rest with corporate regional response teams. Personnel from all departments make up the regional teams. In 1990, Congress passed the Oil Pollution Act. In 1991, the US Coast Guard began developing oil spill response contingency plan regulations, which they are still working on. Meanwhile, four of the five west coast states have also passed laws requiring contingency plans. (Only Hawaii has chosen to wait and see what the federal regulations will entail). Three of the states have already adopted regulations. Given these laws and regulations, along with its corporate structure, Texaco addressed the need to standardize local facility plans as well as its response organization. This paper discusses how, by working together, the Texaco corporate international oil spill response staff and the Texaco western region on-scene commander developed: A standard contingency plan format crossing corporate boundaries and meeting federal and state requirements. A response organization applicable to any size facility or spill. A strategy to sell the standard contingency plan and response organization to the operating units

  2. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 265.51 Section 265.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED..., STORAGE, AND DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The...

  3. Contingency planning in southern Africa: Events rather than processes?

    Directory of Open Access Journals (Sweden)

    Elias Mabaso

    2013-09-01

    Full Text Available With the increasing frequency, magnitude and impact of disasters, there is growing focus on contingency planning as a tool for enhancing resilience. Yet, there is little empirical evidence that reflects on the practice of contingency planning systems within the context of disaster risk reduction. This article explores the practice of contingency planning in southern Africa, focussing on Malawi, Mozambique, Namibia, Zambia and Zimbabwe. A qualitative comparative analysis informed by fieldwork was used. The findings show that (1 there was a wide gap between theory and practice in contingency planning, (2 response activities rarely reflected projected scenarios and (3 resources were inadequate for effective contingency planning. We conclude that unless these issues are addressed, contingency planning is likely to remain a theoretical rather than a practical tool for building disaster-resilient communities in southern African countries. Although a generalisation cannot be made on the status of contingency planning and practice in southern Africa without a wider analysis of more examples, the findings may apply beyond the examined contexts and also offer insights into research gaps.

  4. 40 CFR 300.210 - Federal contingency plans.

    Science.gov (United States)

    2010-07-01

    ... contingency plans under the national response system: The National Contingency Plan, RCPs, and ACPs. These... discharge under § 300.324, and to mitigate or prevent a substantial threat of such a discharge, from a vessel, offshore facility, or onshore facility operating in or near the area. (2) The areas of...

  5. 40 CFR 267.54 - When must I amend the contingency plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false When must I amend the contingency plan... STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.54 When must I amend the contingency plan? You must review, and immediately amend the contingency plan, if necessary, whenever: (a) The facility...

  6. Contingency planning in southern Africa: Events rather than processes?

    OpenAIRE

    Elias Mabaso; Siambabala B. Manyena

    2013-01-01

    With the increasing frequency, magnitude and impact of disasters, there is growing focus on contingency planning as a tool for enhancing resilience. Yet, there is little empirical evidence that reflects on the practice of contingency planning systems within the context of disaster risk reduction. This article explores the practice of contingency planning in southern Africa, focussing on Malawi, Mozambique, Namibia, Zambia and Zimbabwe. A qualitative comparative analysis informed by fieldwork ...

  7. Dengue Contingency Planning: From Research to Policy and Practice

    Science.gov (United States)

    Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J.; Sánchez Tejeda, Gustavo; Lloyd, Linda S.; Hakim, Lokman; Bowman, Leigh R.; Horstick, Olaf; Coelho, Giovanini

    2016-01-01

    Background Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Methodology/Principal findings Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Conclusions/Significance Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak

  8. Proposed energy conservation contingency plan: emergency restrictions on illuminated advertising and certain gas lighting. Economic impact analysis. Environmental impact assessment. Contingency plan No. 5

    Energy Technology Data Exchange (ETDEWEB)

    1976-09-01

    In the event of a severe energy supply disruption or in order to fulfill obligations of the U.S. under the International Energy Program, the President may implement one or more energy conservation contingency plans provided for in the Energy Policy and Conservation Act (EPCA) of 1975. This report describes the economic impact of restrictions on the use of illuminated advertising and certain gas lighting. The proposed plan would reduce demand for electricity and natural gas. The reduced demand for electricity would result in reduced demand for oil, natural gas, and other fuels used to generate electricity. Since oil and natural gas would be in short supply, the reduced use of these fuels in the generation of electricity could make supplies available to other industries. By contrast, the coal supply would not be affected by these conditions. However, the substitutability of coal for fuels in short supply (especially oil for electric generation) would tend to offset the impact of reduced demand for coal to generate electricity. Advertising expenditures would shift. Expenditures for illuminated outdoor signs would fall and expenditures for advertising in other media (e.g., radio, newspapers) would rise. No significant effect upon aggregate retail sales is anticipated. In summary, microeconomic effects of the measure are negligible and all effects are minor and/or beneficial. These effects are almost lost in the projected economic effects that would result from any severe supply interruption.

  9. 40 CFR 267.53 - Who must have copies of the contingency plan?

    Science.gov (United States)

    2010-07-01

    ... contingency plan? 267.53 Section 267.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.53 Who must have copies of the contingency plan? (a) You must maintain a copy of the plan with all revisions at the facility; and...

  10. National Contingency Plan Subpart J

    Science.gov (United States)

    Subpart J of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) directs EPA to prepare a schedule of dispersants, other chemicals, and oil spill mitigating devices and substances that may be used to remove or control oil discharges.

  11. Public education programme for nuclear contingency planning in Hong Kong

    International Nuclear Information System (INIS)

    Wong, M. C.; Li, S. W.

    2002-01-01

    Two nuclear power stations on the coast of southern China are situated some 50 kilometers to the northeast of Hong Kong. Although the stations are far away from Hong Kong, the construction and operation of the nuclear power stations have generated public anxiety locally, in particular, after the Chernobyl accident in 1986. A comprehensive contingency plan which takes into account such concerns of the public has been implemented in Hong Kong. Cooperation by the public is vital to the effective implementation of any contingency plan. Understanding of the basics of radiation protection as well as the contingency plan will help the public to appreciate the situation and react in a rational manner. A public education program to promote awareness of the contingency plan has been implemented in Hong Kong. In particular, a Virtual Exhibition Hall on radiation has been developed and launched in February 2002 for access by the public via Internet. A video and a set of web pages will be launched in the later part of 2002 to inform and educate the public on matters related to nuclear accident response in Hong Kong. This paper describes the public education programme in Hong Kong to promote public awareness and understanding of the nuclear contingency plan

  12. Robustness via Run-Time Adaptation of Contingent Plans

    Science.gov (United States)

    Bresina, John L.; Washington, Richard; Norvig, Peter (Technical Monitor)

    2000-01-01

    In this paper, we discuss our approach to making the behavior of planetary rovers more robust for the purpose of increased productivity. Due to the inherent uncertainty in rover exploration, the traditional approach to rover control is conservative, limiting the autonomous operation of the rover and sacrificing performance for safety. Our objective is to increase the science productivity possible within a single uplink by allowing the rover's behavior to be specified with flexible, contingent plans and by employing dynamic plan adaptation during execution. We have deployed a system exhibiting flexible, contingent execution; this paper concentrates on our ongoing efforts on plan adaptation, Plans can be revised in two ways: plan steps may be deleted, with execution continuing with the plan suffix; and the current plan may be merged with an "alternate plan" from an on-board library. The plan revision action is chosen to maximize the expected utility of the plan. Plan merging and action deletion constitute a more conservative general-purpose planning system; in return, our approach is more efficient and more easily verified, two important criteria for deployed rovers.

  13. Contingency plan for the Oak Ridge National Laboratory liquid low-level waste system

    International Nuclear Information System (INIS)

    DePaoli, S.M.; Ferrada, J.J.; Abraham, T.J.; Brown, C.H.; Lin, K.H.

    1989-12-01

    Oak Ridge National Laboratory (ORNL) is one of the major Department of Energy (DOE) facilities that performs various research and development (R ampersand D) activities. Liquid low-level waste (LLLW) is generated in the course of this work. The primary objective of this task is to develop specific plans of action to be implemented, in the event that the storage space for the LLLW concentrate should approach the minimum value in the operational flexibility range or a problem should develop concerning storage space available for dilute LLLW. This report considers contingency plans/options in the light of six different scenarios, including ''normal operation'' and five others. Evaluation and prioritization of the options were carried out separately for each case. Brief discussions of these scenarios and contingency plans/options are presented. 20 refs., 14 figs., 14 tabs

  14. Graded Approach to the Development of a Contingency Plan for On-Line Maintenance

    International Nuclear Information System (INIS)

    Chang, Hee Seung; Kim, Jung Wun; Song, Tae Young

    2012-01-01

    Many utilities perform preventive maintenance for safety systems during power operation to improve equipment reliability so as to focus on the work activities more easily and improve the quality of maintenance. Such a strategy can also reduce outage work activities, thus allowing resources to be utilized effectively. Preventive maintenance during power operation, known as on-line maintenance (OLM), requires an assessment and mitigation of risk, which can increase owing to out-of-service safety systems. One of the mitigation action plans is a contingency plan. EPRI recommends the development of a contingency plan for all planned system outages which include factors that strongly affect safety. The Korea Hydro and Nuclear Power Company (KHNP) undertook the preventive maintenance of the Essential Chilled Water System (ECWS) of a Westinghouse plant as a pilot OLM implementation. During the preparation of the work activities, a contingency plan was a pertinent issue during the discussions with regulators, especially regarding the scope and depth of the plan. This paper discusses the purpose of a contingency plan, including as examples some cases of US utilities, and proposes a graded approach to develop a contingency plan for OLM in consideration of the risks

  15. Contingency planning for nuclear emergencies in Hong Kong

    International Nuclear Information System (INIS)

    Wong, M. C.

    2002-01-01

    Two nuclear power stations on the coast of southern China are situated some 50 kilometers to the northeast of Hong Kong. Although the stations are far away from Hong Kong, the construction and operation of the nuclear power stations have generated public anxiety locally, in particular, after the Chernobyl accident in 1986. A comprehensive contingency plan which takes into account such concerns of the public has been implemented in Hong Kong. This plan not only aims to ensure a quick and timely response to mitigate the health impact of any accidental release but also targets to re-assure the public that the territory is not contaminated when appropriate. This paper describes the principal elements of the nuclear contingency plan in Hong Kong, namely, an extensive environmental radiation monitoring programme and a proactive public communication programme

  16. Environmental aspects of contingency planning and spill response

    International Nuclear Information System (INIS)

    Hillman, S.O.

    1993-01-01

    Alyeska Pipeline Service Company has implemented an incident command system (ICS) for crisis management within the company for response to spills at all company facilities including the Valdez Marine Terminal. The system is also used by Alyeska acting as the initial response contractor for TAPS laden tankers within Prince William Sound. During the past three years, Alyeska has undertaken a complete review of the spill prevention and response plans for these areas. This poster session focuses on the environmental aspects of the response planning efforts. Information is available on contingency planning updates in the areas of dispersant use, burning as a response tool, bioremediation of marine oil spills, waste management, permitting, coastal resource and sensitive habitat data base, and wildlife protection and management. All of these subjects are addressed in the resource documents (RD) supplementing the contingency plans. The RD revisions have been a coordinated effort, involving operators, agencies, and the public through the citizen advisory group

  17. Getting help quickly: older people and community worker perspectives of contingency planning for falls management.

    Science.gov (United States)

    Charlton, Kimberly; Murray, Carolyn M; Kumar, Saravana

    2018-01-01

    Older people living in the community need to plan for getting help quickly if they have a fall. In this paper planning for falls is referred to as contingency planning and is not a falls prevention strategy but rather a falls management strategy. This research explored the perspectives of older people and community workers (CWs) about contingency planning for a fall. Using a qualitative descriptive approach, participants were recruited through a community agency that supports older people. In-depth interviews were conducted with seven older people (67-89 years of age) and a focus group was held with seven workers of mixed disciplines from the same agency. Older people who hadn't fallen were included but were assumed to be at risk of falls because they were in receipt of services. Thematic analysis and concept mapping combined the data from the two participant groups. Four themes including preconceptions about planning ahead for falling, a fall changes perception, giving, and receiving advice about contingency plans and what to do about falling. Both CWs and older people agree contingency planning requires understanding of individual identity and circumstances. CWs have limited knowledge about contingency planning and may be directive, informative, or conservative. Implications for Rehabilitation Falls can result in serious consequences for older people. There is an evidence-practice gap as availability of and access to contingency planning does not necessarily mean older people will use it in a falls emergency. Older people prefer community workers to be directive or informative about contingency planning options but they do want choice and control. Increased community workers knowledge of, and collaborative decision-making about, contingency planning may promote patient-centered services and assist in closing the evidence-practice gap.

  18. Contingency planning at the flotilla level in the United States Coast Guard Auxiliary: flotilla 81-a case study.

    Science.gov (United States)

    Schooley, Shawn Erik

    2013-01-01

    This article presents a case study of United States Coast Guard Auxiliary Flotilla 81. Flotilla 81 created its first formal, single agency contingency plan. The research question addressed is "How can a flotilla successfully develop a contingency plan?" Five emergent themes are identified. They are offered as suggested promising practices for other flotillas in need of creating a contingency plan. Findings suggest successful contingency planning is a result of effective collaboration with community partners. Network management theory is a key to an effective contingency planning process.

  19. 202-S Hexone Facility supplemental information to the Hanford Facility Contingency Plan

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-03-01

    This document is a unit-specific contingency plan for the 202-S Hexone Facility and is intended to be used as a supplement to the Hanford Facility Contingency Plan. This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of WAC 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units. The 202-S Hexone Facility is not used to process radioactive or nonradioactive hazardous material. Radioactive, dangerous waste material is contained in two underground storage tanks, 276-S-141 and 276-S-142. These tanks do not present a significant hazard to adjacent facilities, personnel, or the environment. Currently, dangerous waste management activities are not being applied at the tanks. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 202-S Hexone Facility

  20. 78 FR 73449 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-12-06

    ... Substances Pollution Contingency Plan (NCP). This partial deletion pertains to the soil of 1,154 residential...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the Omaha Lead Superfund Site AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule...

  1. 78 FR 11620 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List...

    Science.gov (United States)

    2013-02-19

    ... and Hazardous Substances Pollution Contingency Plan National Priorities List: Deletion of the Kerr... Substances Pollution Contingency Plan (NCP). EPA and the State of Illinois, through the Illinois... because we view this as a noncontroversial revision and anticipate no adverse comment. We have explained...

  2. 78 FR 69360 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-11-19

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial... and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of California... Corp Air Station Superfund Site without prior Notice of Intent for Partial Deletion because EPA views...

  3. 76 FR 20605 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List...

    Science.gov (United States)

    2011-04-13

    ... and Hazardous Substance Pollution Contingency Plan National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). EPA and the State of Michigan, through the Michigan Department... Delete because we view this as a noncontroversial revision and anticipate no adverse comment. We have...

  4. 75 FR 43115 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-07-23

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent to Partially..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... Intent for Partial Deletion because EPA views this as a noncontroversial revision and anticipates no...

  5. 78 FR 45905 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-07-30

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Craig... Substances Pollution Contingency Plan (NCP). The EPA and the Commonwealth of Pennsylvania, through the... Craig Farm Drum Superfund Site without prior Notice of Intent to Delete because we view this as a...

  6. 76 FR 45484 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-07-29

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... PBL Superfund Site without prior Notice of Intent for Deletion because EPA views this as a...

  7. 76 FR 18136 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-04-01

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Norwood... amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The... we view this as a noncontroversial revision and anticipate no adverse comment. We have explained our...

  8. 78 FR 47267 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-08-05

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Contingency Plan (NCP). The EPA and the State of Oklahoma, through the Oklahoma Department of Environmental... without prior Notice of Intent to Delete because we view this as a noncontroversial revision and...

  9. 76 FR 51316 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-08-18

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Contingency Plan (NCP). The EPA and the Commonwealth of Puerto Rico, through the Puerto Rico Environmental... Site without prior Notice of Intent to Delete because we view this as a noncontroversial revision and...

  10. 78 FR 44512 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-07-24

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Sola... Pollution Contingency Plan (NCP). The EPA and the State of California, through the Regional Water Quality...., Inc. Superfund Site without prior Notice of Intent to Delete because we view this as a...

  11. 76 FR 32115 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-06-03

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent To Delete the... Substances Pollution Contingency Plan (NCP). The EPA and the State of Delaware, through the Delaware... Delete because EPA views this as a noncontroversial revision and anticipates no adverse comment. We have...

  12. 76 FR 81904 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-12-29

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Hipps..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... of Intent to Delete because we view this as a noncontroversial revision and anticipate no adverse...

  13. 78 FR 45167 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-07-26

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Cannon... Substances Pollution Contingency Plan (NCP). The EPA and the State of Massachusetts, through the...), Superfund Site without prior Notice of Intent to Delete because we view this as a noncontroversial revision...

  14. 77 FR 67783 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List...

    Science.gov (United States)

    2012-11-14

    ... and Hazardous Substance Pollution Contingency Plan National Priorities List: Deletion of the Waste... and Hazardous Substances Pollution Contingency Plan (NCP). EPA and the State of Michigan, through the...-Holland Lagoons Superfund Site without prior Notice of Intent to Delete because we view this as a...

  15. 75 FR 33747 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-06-15

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for... Notice of Intent to Delete the soils of Operable Unit 1 and the underlying ground water of the... National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Texas...

  16. 76 FR 45483 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-07-29

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for... Contingency Plan (NCP). The EPA and the State of Texas, through the Texas Commission on Environmental Quality... Notice of Deletion for SMPA Superfund Site without prior Notice of Intent for Deletion because EPA views...

  17. 77 FR 43567 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2012-07-25

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Fort... Contingency Plan (NCP). The EPA and the State of New Jersey, through the NJ Department of Environmental... Intent to Delete because we view this as a noncontroversial revision and anticipate no adverse comment...

  18. 76 FR 50441 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-08-15

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). The EPA and the State of New Jersey, through the New Jersey... Deletion of the Sayreville Landfill Superfund Site without prior Notice of Intent to Delete because we view...

  19. 78 FR 66325 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-11-05

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). The EPA and the State of South Carolina, through the South... because we view this as a noncontroversial revision and anticipate no adverse comment. We have explained...

  20. 78 FR 60721 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-10-02

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... final Notice of Deletion of the Ludlow Sand & Gravel Superfund Site (Site), located in the Town of Paris..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan...

  1. Implications of Contingency Planning Support for Weather and Icing Information

    Science.gov (United States)

    Vigeant-Langlois, Laurence; Hansman, R. John, Jr.

    2003-01-01

    A human-centered systems analysis was applied to the adverse aircraft weather encounter problem in order to identify desirable functions of weather and icing information. The importance of contingency planning was identified as emerging from a system safety design methodology as well as from results of other aviation decision-making studies. The relationship between contingency planning support and information on regions clear of adverse weather was investigated in a scenario- based analysis. A rapid prototype example of the key elements in the depiction of icing conditions was developed in a case study, and the implications for the components of the icing information system were articulated.

  2. Unit-Specific Contingency Plan for the 183-H Solar Evaporation Basins

    International Nuclear Information System (INIS)

    Edens, V.G.

    1998-04-01

    This document is a supplement to DOE/RL-93-75, 'Hanford Contingency Plan.' It provides the unit-specific information needed to fully comply with the Washington Administrative Code. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H Solar Evaporation Basins were four concrete internal surfaces, which contained radiologically and hazardous contaminated waste. The 183-H Basin area is a final status treatment, storage, and disposal unit undergoing Resource Conservation and Recovery Act modified post- closure care

  3. 78 FR 48844 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-08-12

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Mosley... National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Oklahoma... Deletion of the MRSL Superfund Site without prior Notice of Intent to Delete because we view this as a...

  4. 76 FR 70057 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-11-10

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Partial Deletion of the...). Refer to Figures 1 to 3 in the deletion docket to view the location of the two parcels being proposed... Substances Pollution Contingency Plan (NCP). This direct final partial deletion is being published by EPA...

  5. 78 FR 60809 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-10-02

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). EPA and the State of New York, through the New York State... Deletion of the Site without prior Notice of Intent to Delete because EPA views this as a noncontroversial...

  6. 78 FR 53113 - Approval and Promulgation of Implementation Plans; California; San Joaquin Valley; Contingency...

    Science.gov (United States)

    2013-08-28

    ...] Approval and Promulgation of Implementation Plans; California; San Joaquin Valley; Contingency Measures for... California to address Clean Air Act nonattainment area contingency measure requirements for the 1997 annual... Air Act Requirements for Contingency Measures III. Review of the Submitted San Joaquin Valley PM 2.5...

  7. 78 FR 16612 - National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public...

    Science.gov (United States)

    2013-03-18

    ... Hazardous Substances Pollution Contingency Plan (NCP) to broaden the technology, to include computer... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 300 [EPA-HQ-SFUND-2012-0738; FRL-9791-4] National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public Availability of the...

  8. Unit-specific contingency plan for the 183-H solar evaporation basins. Revision 1

    International Nuclear Information System (INIS)

    Zoric, J.P.

    1996-03-01

    This document is a supplement to the Hanford Facility Contingency Plan. It provides the unit-specific information needed to fully comply with the Washington Administrative Code, Chapter 173-303, ''Dangerous Waste Regulations,'' for contingency plans. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H solar evaporation basins are four concrete internal surfaces which contained radiologically- and hazardous-contaminated waste. The 183-H basins are currently empty, inactive and designated as a Resource Conservation and Recovery Act interim-status treatment, storage, and disposal unit undergoing closure. There is no dangerous waste management actively occurring. There is very little likelihood of any incidents that would present hazards to public health or the environment occurring at the 183-H basins

  9. Unit-specific contingency plan for the 183-H Solar Evaporation Basins. Revision 2

    International Nuclear Information System (INIS)

    Zoric, J.P.

    1997-01-01

    This document is a supplement to the Hanford Facility Contingency Plan. It provides the unit-specific information needed to fully comply with the Washington Administrative Code, Chapter 173-303, ''Dangerous Waste Regulations,'' for contingency plans. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H Solar Evaporation Basins are four concrete internal surfaces which contained radiologically- and hazardous-contaminated waste. The 183-H basins are currently empty, inactive and designated as a Resource Conservation and Recovery Act interim-status treatment, storage, and disposal unit undergoing closure. There is no dangerous waste management actively occurring. There is very little likelihood of any incidents that would present hazards to public health or the environment occurring at the 183-H basins

  10. 77 FR 76815 - Handling of Animals; Contingency Plans

    Science.gov (United States)

    2012-12-31

    ... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service 9 CFR Parts 2 and 3 [Docket No. APHIS-2006-0159] RIN 0579-AC69 Handling of Animals; Contingency Plans AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Final rule. SUMMARY: We are amending the Animal Welfare Act...

  11. 75 FR 54821 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List; Intent...

    Science.gov (United States)

    2010-09-09

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List; Intent for Partial... amended, is an Appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The... Superfund Site without prior Notice of Intent for Partial Deletion because EPA views this as a...

  12. 76 FR 70105 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List: Partial...

    Science.gov (United States)

    2011-11-10

    ... and Hazardous Substance Pollution Contingency Plan National Priorities List: Partial Deletion of the... appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). EPA and the State... property PINs listed above. The deletion of these two parcels from the Site affects all surface soils...

  13. 75 FR 47521 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List: Intent...

    Science.gov (United States)

    2010-08-06

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Intent To Delete the... appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the... Corporation (Markhams) Superfund Site without prior notice of intent to delete because we view this as a...

  14. Thinking ahead about reproductive health: contingency planning and emergency preparedness in crisis situations (Iraq and West Africa).

    Science.gov (United States)

    DeLargy, Pamela; Alakbarov, Ramiz

    2004-09-01

    The United Nations Population Fund (UNFPA) coordinated efforts to integrate RH into contingency planning for the 2003 Iraq crisis and the 2003 regional response for displaced populations in West Africa. Using UNFPA's network of country offices in the Middle East, staff developed logistics plans, conducted workshops and pre-positioned RH supplies. Though refugee movements did not occur, the contingency planning enhanced the response capacity of UNFPA offices and made it possible to rapidly provide assistance inside Iraq. In West Africa, multi-country workshops and follow-up resulted in country-level and regional action plans useful during the renewed crises of 2003; scarce funding, however, limited their full implementation. UNFPA's experiences show that contingency planning requires committing resources for crises, some of which will not occur; new staff skills; and follow-up. Moreover, RH is considered by some to be additional to the core elements of contingency planning. RH's political sensitivity, particularly with certain donors, further complicated integrated planning.

  15. National Contingency Plan (NCP) Subpart J Product Schedule Fact Sheet

    Science.gov (United States)

    This section of the National Oil and Hazardous Substances Pollution Contingency Plan stipulates the criteria for listing and managing the use of dispersants and other chemical and biological agents used to mitigate oil spills.

  16. A methodology to assist in contingency planning for protection of nuclear power plants against land vehicle bombs

    International Nuclear Information System (INIS)

    James, J.W.; Goldman, L.A.; Lobner, P.R.; Finn, S.P.; Koch, T.H.; Veatch, J.D.

    1989-04-01

    This report provides a methodology which could be used by operators of licensed nuclear power reactors to address issues related to contingency planning for a land vehicle bomb, should such a threat arise. The methodology presented in this report provides a structured framework for understanding factors to be considered in contingency planning for a land vehicle bomb including: (1) system options available to maintain a safe condition, (2) associated components and equipment, (3) preferred system options for establishing and maintaining a safe shutdown condition, and (4) contingency measures to preserve the preferred system options. Example applications of the methodology for a Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR) are provided along with an example of contingency plan changes necessary for implementation of this methodology, a discussion of some contingency measures that can be used to limit land vehicle access, and a bibliography. 2 refs., 11 figs., 6 tabs

  17. Contingency Analysis Post-Processing With Advanced Computing and Visualization

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Yousu; Glaesemann, Kurt; Fitzhenry, Erin

    2017-07-01

    Contingency analysis is a critical function widely used in energy management systems to assess the impact of power system component failures. Its outputs are important for power system operation for improved situational awareness, power system planning studies, and power market operations. With the increased complexity of power system modeling and simulation caused by increased energy production and demand, the penetration of renewable energy and fast deployment of smart grid devices, and the trend of operating grids closer to their capacity for better efficiency, more and more contingencies must be executed and analyzed quickly in order to ensure grid reliability and accuracy for the power market. Currently, many researchers have proposed different techniques to accelerate the computational speed of contingency analysis, but not much work has been published on how to post-process the large amount of contingency outputs quickly. This paper proposes a parallel post-processing function that can analyze contingency analysis outputs faster and display them in a web-based visualization tool to help power engineers improve their work efficiency by fast information digestion. Case studies using an ESCA-60 bus system and a WECC planning system are presented to demonstrate the functionality of the parallel post-processing technique and the web-based visualization tool.

  18. The management of acute risks. Oil spill contingency planning and response

    International Nuclear Information System (INIS)

    Monk, D.C.; Cormack, D.

    1992-01-01

    It is clear that the risks of environmental damage can be best minimized by preventing oil spills from occurring at all. Since absolute prevention is unrealistic, however, early detection is essential and aerial surveillance techniques are of great value in this connection. If spills do occur, proper contingency planning and clean-up techniques can minimize impacts, but will rarely avoid them completely if the spilled oil reaches the coastline. It is evident that a main priority should be to prevent spilled oil reaching the coastline. The way in which oil spill response strategy is implemented is discussed in detail. It is based on four key elements: the allocation of responsibilities; contingency planning; training and exercises; regular audit of plans and response mechanisms. A case study of the oil spill strategy employed at the Sullom Voe oil terminal in Shetland is used as an illustration. (UK)

  19. 40 CFR 109.5 - Development and implementation criteria for State, local and regional oil removal contingency plans.

    Science.gov (United States)

    2010-07-01

    ... regional oil removal contingency plans. Criteria for the development and implementation of State, local and... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Development and implementation criteria for State, local and regional oil removal contingency plans. 109.5 Section 109.5 Protection of...

  20. Development of a unified federal/state coastal/inland oil and hazardous substance contingency plan for the state of Alaska

    International Nuclear Information System (INIS)

    Lautenberger, C.; Pearson, L.

    1993-01-01

    Passage of the US Oil Pollution Act (OPA) of 1990 expanded the existing federal planning and response framework in several ways. The OPA created a new requirement for facility and tank vessel response plans and creates an area-level planning and coordination structure to help supplement federal, regional, and local planning efforts. The OPA amended the existing Clean Water Act's section 311(j)(4), which establishes area committees and area contingency plans as primary components of this structure. In 1980, the Alaska legislature enacted legislation which defines the state's policies regarding oil spills. Following the 1989 Exxon Valdez spill, additional legislation was passed to expand and strengthen the state's oil spill program. Specifically, in 1989 the Senate Bill 261 required the Alaska Department of Environmental Conservation to develop, annually review, and revise the State Oil and Hazardous Substance Contingency Plans (State Master and Regional Plans). State regional plans serve as annexes to the State Master Plan. The coordinated and cooperative efforts by government agencies and local entities toward creating a unified federal/state, coastal/inland Oil and Hazardous Substance Contingency Plan are presented, along with the development and progress of unified area/regional contingency plans for Alaska. 3 figs

  1. Year 2000 Contingency Planning and Cost Reporting at the Defense Finance and Accounting Service

    National Research Council Canada - National Science Library

    1998-01-01

    ...: complied with the requirements of the DoD Year 2000 Management Plan, prepared adequate Year 2000 system-level contingency plans, and reported complete and reliable Year 2000 system cost estimates...

  2. Nonradioactive Dangerous Waste Landfill supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the Nonradioactive Dangerous Waste Landfill and is intended to be used as a supplement to DOE/RL-93-75, 'Hanford Facility Contingency Plan.' This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173-303 for certain Resource, Conservation and Recovery Act of 1976 waste management units. The Nonradioactive Dangerous Waste Landfill (located approximately 3.5 miles southeast of the 200 East Area at the Hanford Site) was used for disposal of nonradioactive dangerous waste from January 1975 to May 1985. Currently, there are no dangerous waste streams disposed in the Nonradioactive Dangerous Waste Landfill. Dangerous waste management activities are no longer required at the landfill. The landfill does not present a significant hazard to adjacent units, personnel, or the environment. It is unlikely that incidents presenting hazards to public health or the environment would occur at the Nonradioactive Dangerous Waste Landfill

  3. Oil spill contingency planning for offshore oil fields - a new concept established for the Norwegian continental shelf

    International Nuclear Information System (INIS)

    Singsaas, I.; Reed, M.; Nygaard, T.; Sundnes, G.Jr.

    1998-01-01

    The development of a new concept for oil spill contingency planning to be used for offshore oil fields on the Norwegian continental shelf was discussed. The factors which are important in developing a good oil spill contingency plan include a good understanding of: (1) the fate, behaviour and weathering of the specific oil, (2) relevant oil spill scenarios, (3) drift and spreading of the oil, and (4) specific requirements for the effectiveness of the chosen response options. The oil spill contingency and response (OSCAR) model was used for quantitative comparison of alternative response options. 21 refs., 2 tabs., 7 figs

  4. 120-D-1 (100-D) Ponds supplemental information to the Hanford Facility Contingency Plan. Revision 2

    International Nuclear Information System (INIS)

    Petersen, S.W.; Zoric, J.P.

    1997-06-01

    This document is a supplement to the Hanford Facility Contingency Plan and provides the unit-specific information needed to fully comply with the Washington Administrative Code 173-303 for contingency plans. The 100-D ponds are unlined surface impoundments that were mainly used to dispose of nondangerous wastewater, The ponds are designated as a single treatment, storage, and/or disposal unit because of potential corrosive characteristics of the wastewater. No waste is currently present at the 100-D Ponds

  5. 216-A-29 Ditch supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-A-29 Ditch and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173- 303 for certain Resource Conservation and Recovery Act of 1976 waste management units. The 216-A-29 Ditch is a surface impoundment that received nonregulated process and cooling water and other dangerous wastes primarily from operations of the Plutonium/Uranium Extraction Plant. Active between 1955 and 1991, the ditch has been physically isolated and will be closed. Because it is no longer receiving discharges, waste management activities are no longer required at the unit. The ditch does not present a significant hazard to adjacent units, personnel, or the environment. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 216-A-29 Ditch

  6. 216-U-12 Crib supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-U-12 Crib and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173- 303 for certain Resource Conservation and Recovery Act of 1976 waste management units. The 216-U-12 Crib is a landfill that received waste from the 291-U-1 Stack, 244-WR Vault, 244-U via tank C-5, and the UO 3 Plant. The crib pipeline was cut and permanently capped in 1988, and the crib has been backfilled. The unit will be closed under final facility standards. Waste management activities are no longer required at the unit. The crib does not present a significant hazard to adjacent units, personnel, or the environment. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 216-U-12 Crib

  7. Environmental surveillance: An integral part of the spill contingency plan

    International Nuclear Information System (INIS)

    Salinas, J.; Bozzo, W.

    1993-01-01

    Typically, the initial response to spills is directed at containing, controlling, and stopping the flow of spilled materials. The primary goal of such a response is to limit the spread and further impact of spilled material, and to initiate timely cleanup and recovery of affected areas. Surveillance of actual spill impacts has often followed an after the fact approach, using only immediately available resources. Surveillance may occur quickly after a spill, but in most incidents its occurs as a follow-up action after initial response and containment have been achieved. Insufficient planning may produce spill surveillance that inadequately assesses impacts, fails to incorporate baseline data, and does not clearly identify a cleanup recovery and endpoint. The management and operations contractor for the US Dept. of Energy's Strategic Petroleum Reserve (SPR) conducts environmental surveillance activities in response to spill incidents when they occur at these facilities. These surveillance activities, when conducted as part of the response, are useful instruments in the initial assessment of spill incidents, management of spill response, containment, and cleanup activities, and for monitoring and documenting postspill impacts and recovery. An Environmental Surveillance Plan (ESP) incorporated in the SPR Spill Contingency Plan provides for initiation of environmental surveillance as part of the spill response. The ESP outlines, through alogic tree, conditions for activating the plan, key indicator parameters for evaluation, detailed methods for establishing surveillance stations, lists of key personnel, locations of equipment necessary to perform surveillance, and conditions for termination of environmental surveillance

  8. The Chalk River Nuclear Laboratories contingency plan -a brief description

    International Nuclear Information System (INIS)

    White, J.M.

    1982-01-01

    A brief description of the contingency plan which deals with both the on-site and off-site consequences of a serious nuclear accident is given. The off-site consequences of different size releases and the subsequent action taken by employees, radiation protection experts, municipal, Provincial and Federal authorities is described and the interaction of the various groups is discussed. (author)

  9. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  10. 216-A-36B Crib supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-A-36B Crib and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173- 303 for certain Resource Conservation and Recovery Act of 1976 waste management units. The 216-A-36B Crib is a landfill that received ammonia scrubber waste from the 202-A Building (Plutonium/Uranium Extraction Plant) between 1966 and 1972. In 1982, the unit was reactivated to receive additional waste from Plutonium/Uranium Extraction operations. Discharges ceased in 1987, and the crib will be closed under final facility standards. Because the crib is not receiving discharges, waste management activities are no longer required. The crib does not present a significant hazard to adjacent units, personnel, or the environment. There is little likelihood that any incidents presenting hazards to public health or the environment would occur at the 216-A-36B Crib

  11. Neither snow nor rain: contingency planning by a clinical reference laboratory courier service for weather related emergencies.

    Science.gov (United States)

    Bankson, Daniel D; Heim, Joseph A

    2014-01-01

    To optimize transportation processes, we present herein a contingency plan that coordinates interim measures used to ensure continued and timely services when climate based events might cause an interruption of the usual specimen transportation processes. As an example, we outline the implementation and effectiveness of a contingency plan for network laboratory courier automobile transportation during times of mountain pass highway closure. Data available from an approximately 3-year period from October 10, 2010 through August 29, 2013 revealed a total of 690 complete closures in the eastbound or westbound lanes of the Interstate-90 highway in the Snoqualmie Pass area in the state of Washington. Despite the frequency of closures, the Washington State Department of Transportation was effective in limiting the duration of closures. Road closures of less than 1 hour accounted for 58.7% of the total closures. No recorded closures prevented dispatched couriers from completing a prescheduled Snoqualmie Pass route. We identified no delays as being clinically significant, despite that there were 5 instances of delays greater than 4 hours. We implemented a contingency plan of aiding courier logistics during all times of pass closure. The plan includes an easy to interpret Condition Dashboard as a status indicator and a Decision Tree that references and summarizes information. Overall, the contingency plan allows for an objective, robust, proactive decision support system that has enabled operational flexibility and has contributed to continued safe, on-time specimen transportation; clients and courier and reference laboratory staff have appreciated these features and associated outcomes. Copyright© by the American Society for Clinical Pathology (ASCP).

  12. Assessing Energy Intake in Daily Life: Signal-Contingent Smartphone Application Versus Event-Contingent Paper and Pencil Estimated Diet Diary

    Directory of Open Access Journals (Sweden)

    Saskia Wouters

    2016-12-01

    Full Text Available Objectives: Investigating between-meal snack intake and its associated determinants such as emotions and stress presents challenges because both vary from moment to moment throughout the day. A smartphone application (app, was developed to map momentary between-meal snack intake and its associated determinants in the context of daily life. The aim of this study was to compare energy intake reported with the signal-contingent app and reported with an event-contingent paper and pencil diet diary. Methods: In a counterbalanced, cross-sectional design, adults (N = 46 from the general population reported between-meal snack intake during four consecutive days with the app and four consecutive days with a paper and pencil diet diary. A 10-day interval was applied between the two reporting periods. Multilevel regression analyses were conducted to compare both instruments on reported momentary and daily energy intake from snacks.  Results: Results showed no significant difference (B = 11.84, p = .14 in momentary energy intake from snacks between the two instruments. However, a significant difference (B = –105.89, p < .01 was found on energy intake from total daily snack consumption. Conclusions: As at momentary level both instruments were comparable in assessing energy intake, research purposes will largely determine the sampling procedure of choice. When momentary associations across time are the interest of study, a signal-contingent sampling procedure may be a suitable method. Since the compared instruments differed on two main features (i.e. the sampling procedure and the device used it is difficult to disentangle which instrument was the most accurate in assessing daily energy intake.

  13. 76 FR 56362 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List

    Science.gov (United States)

    2011-09-13

    ... and Hazardous Substances Pollution Contingency Plan National Priorities List AGENCY: Environmental... protection, Air pollution control, Chemicals, Hazardous Waste, Hazardous substances, Intergovernmental... processing the deletion notice. The online Federal Document Management System (FDMS) did not include required...

  14. 76 FR 56294 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List

    Science.gov (United States)

    2011-09-13

    ... and Hazardous Substances Pollution Contingency Plan National Priorities List AGENCY: Environmental... pollution control, Chemicals, Hazardous Waste, Hazardous substances, Intergovernmental relations, Penalties... error in processing the direct- final rule. The online Federal Document Management System (FDMS) did not...

  15. 75 FR 44920 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-07-30

    ... State Registry of Inactive Hazardous Waste Disposal Sites as a ``Class 2 Inactive Hazardous Waste Site..., Chemicals, Hazardous waste, Hazardous substances, Intergovernmental relations, Natural resources, Oil... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the SMS...

  16. Genesis Contingency Planning and Mishap Recovery: The Sample Curation View

    Science.gov (United States)

    Stansbery, E. K.; Allton, J. H.; Allen, C. C.; McNamara, K. M.; Calaway, M.; Rodriques, M. C.

    2007-01-01

    Planning for sample preservation and curation was part of mission design from the beginning. One of the scientific objectives for Genesis included collecting samples of three regimes of the solar wind in addition to collecting bulk solar wind during the mission. Collectors were fabricated in different thicknesses for each regime of the solar wind and attached to separate frames exposed to the solar wind during specific periods of solar activity associated with each regime. The original plan to determine the solar regime sampled for specific collectors was to identify to which frame the collector was attached. However, the collectors were dislodged during the hard landing making identification by frame attachment impossible. Because regimes were also identified by thickness of the collector, the regime sampled is identified by measuring fragment thickness. A variety of collector materials and thin films applied to substrates were selected and qualified for flight. This diversity provided elemental measurement in more than one material, mitigating effects of diffusion rates and/or radiation damage. It also mitigated against different material and substrate strengths resulting in differing effects of the hard landing. For example, silicon crystal substrates broke into smaller fragments than sapphire-based substrates and diamond surfaces were more resilient to flying debris damage than gold. The primary responsibility of the curation team for recovery was process documentation. Contingency planning for the recovery phase expanded this responsibility to include not only equipment to document, but also gather, contain and identify samples from the landing area and the recovered spacecraft. The team developed contingency plans for various scenarios as part of mission planning that included topographic maps to aid in site recovery and identification of different modes of transport and purge capability depending on damage. A clean tent, set-up at Utah Test & Training Range

  17. Standard format and content for radiological contingency plans for fuel cycle and materials facilities. Regulatory report

    International Nuclear Information System (INIS)

    1981-07-01

    This report is issued as guidance to those fuel cycle and major materials licensees who are required by the NRC to prepare and submit a radiological contingency plan. This Standard Format has been prepared to help assure uniformity and completeness in the preparation of those plans

  18. 76 FR 510 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-01-05

    ..., Intergovernmental relations, Penalties, Reporting and recordkeeping requirements, Superfund, Water pollution control... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... Site is located in Albuquerque, Bernalillo County, New Mexico. After this deletion, this 62 acres will...

  19. 76 FR 11350 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-03-02

    ..., Reporting and recordkeeping requirements, Superfund, Water pollution control, Water supply. Dated: February... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... Mexico, from the National Priorities List (NPL). The NPL, promulgated pursuant to section 105 of the...

  20. 77 FR 31215 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2012-05-25

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... the surface soil, unsaturated subsurface soil, surface water and sediments of Operable Unit (OU) 1...: The Environmental Protection Agency (EPA) Region 8 announces the deletion of Operable Unit (OU) 1--the...

  1. The economic value of transportation energy contingency planning: An objective model for analyzing the economics of domestic renewable energy for supply augmentation

    Science.gov (United States)

    Shaten, Richard Jay

    1998-12-01

    Petroleum provides 90% of transportation energy needs. Domestic production is decreasing and global demand is increasing. Risk of escalating prices and supply interruptions are compounded by environmental and military externalities and lost opportunities from the failure to develop alternative domestic resources. Within the context of "energy contingency planning" municipalities should evaluate crisis mitigation strategies. Supply augmentation using domestic renewable fuels is proposed to avert future financial liabilities. A method for calculating the economic value of this strategy is demonstrated. An objective function and associated constraints represent the cost of preparing for each of three possible scenarios: status quo, inflationary and crisis. Constraints ensure that municipal fuel needs are met. Environmental costs may be included. Optimal solutions determine the fuel supply mix for each scenario. A 3 x 3 matrix presents the range of actual costs resulting from preparing for each scenario and subsequent three possible outcomes. The distribution of probabilities of the outcomes is applied to the cost matrix and an "expected value" of preparing for each scenario is calculated. An unanticipated crisis outcome results in. The expected value of the cost of preparing for a crisis is cast as an insurance premium against potential economic liability. Policy makers accept the crisis preparation fuel mix if: (a) they agree with the calculated penalty cost, or (b) they accept the burden of the insurance premium. Green Bay Wisconsin was chosen as a sample municipality. Results show that a perceived 10% chance of crisis requires an annual tax of 4.00 per household to avert economic impacts of 50 million. At a perceived 50% chance of crisis preparing for the crisis would begin to save the municipality money.

  2. 75 FR 55479 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-09-13

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... . SUPPLEMENTARY INFORMATION: The portion of the site to be deleted from the NPL is the surface media (soil... further actions. List of Subjects in 40 CFR Part 300 Environmental protection, Air pollution control...

  3. Oil spill contingency planning in the Ivory coast

    International Nuclear Information System (INIS)

    Bender, K.; Jensen, S.K.; Ostergaerd, J.; Nogbou, P.

    1993-01-01

    The administrative center in charge of handling oil spill pollution situations on the Ivory Coast, West Africa, is named Centre Ivoirien Antipollution (CIAPOL). Its organizational structure has been reshuffled recently. CIAPOL now has three divisions: a laboratory division, a division for cleaning up oil and chemical pollution at sea, and an administrative division. The risk for oil pollution is known: within the past ten years five spills have been reported. All of these have been connected to operations relating to the refinery in Abidjan. More than 2,000 ships call at the port of Abidjan every year. Minor oil slicks are found almost permanently in the harbor and the lagoons around the harbor. Lumps of tar are rather common on the beaches all along the country's coast. This paper focuses on the background investigation in sensitive areas and risk analysis that led to a revision of the oil spill contingency plan, Plan Pollumar, and the recent purchase of oil spill cleanup equipment. The creation of a regional oil pollution response center at CIAPOL for all of the countries in West Africa, is proposed

  4. Contingency plan for the Old Hydrofracture Facility tanks sluicing project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-10-01

    Lockheed Martin Energy Systems, Inc. (Energy Systems), plans to begin a sluicing (flushing) and pumping project to remove the contents from five inactive, underground storage tanks at the Old Hydrofracture Facility (OHF) at the Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The tank contents will be transferred to the Melton Valley Storage Tanks, which are part of the active waste treatment system at ORNL. The purpose of the project is to minimize the risk of leaking the highly radioactive material to the environment. The five OHF tanks each contain a layer of sludge and a layer of supernatant. Based on a sampling project undertaken in 1995, the sludge in the tanks has been characterized as transuranic and mixed waste and the supernatants have been characterized as mixed waste. The combined radioactivity of the contents of the five tanks is approximately 29,500 Ci. This contingency plan is based on the preliminary design for the project and describes a series of potential accident/release scenarios for the project. It outlines Energy Systems' preliminary plans for prevention, detection, and mitigation. Prevention/detection methods range from using doubly contained pipelines to alarmed sensors and automatic pump cutoff systems. Plans for mitigation range from pumping leaked fluids from the built-in tank drainage systems and cleaning up spilled liquids to personnel evacuation

  5. Study of the Model of Activating Contingency Plans within Disruptive Incidents by Stages%突发事件下分阶段启动应急预案模型研究

    Institute of Scientific and Technical Information of China (English)

    于辉; 江智慧

    2011-01-01

    经前期处置下,研究管理者面对突发事件应该何时启动前期处置方案和应急预案的问题.在完全没有突发事件持续时阎信息的条件下,利用局内决策理论与方法构建了企业何时启动前期处置方案和应急预案的分阶段启动模型,并利用"竞争比"说明该方案的有效性.在此基础上,进一步通过数值分析表明分阶段启动应急预案的重要意义.%The increased number of natural disasters has disrupted social and economic progress. Minimizing the impact of these disasters can bring stability to society. Emergency response systems have played an important role in achieving this goal. Since the "SARS" crisis in the year 2003, China has begun to focus on building emergency response systems. A national contingency plan system was established in 2004 according to the "Classification" rule. China initially formed a main emergency plan system,constituted by national overall emergency response plans, specific contingency plans, department emergency plans, local emergency plans, and contingency plans for enterprises with large-scale activities.Existing literature has focused on the importance of contingency plans, the assessment of contingency plans, and approaches to improving emergency preparedness. Few studies have addressed problems associated with the activation of contingency plans when the public administration is disrupted by natural disasters. This paper investigates how managers activate contingency plans at the predisposal stage and potential problems that may arise from disruption by natural disasters at this stage. Case studies are conducted and our analysis results show that activating contingency plans at the pre-disposition stage is effective at dealing with public crises caused by natural disasters. A mathematical model is constructed to provide information on when to activate contingency plans in different phases.Decision theories and methods are used to help propose an

  6. Contingency planning for nuclear plants: an approach for use in industrial plants and hazardous products storage facilities

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Paulo Roberto Werneck de, E-mail: paulo@pwerneck.com [Universidade Federal Fluminense (UFF), Angra dos Reis, RJ (Brazil); Hora, Antonio Ferreira da, E-mail: dahora@vm.uff.br [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2015-07-01

    The purpose of this paper is establishing a basic system model for the development of contingency plans for emergencies. This includes the identification of agents involved in aid and assistance planning, pointing out communication chains among them, the delegation of action coordination and control, as well as the composition and structure of crisis centers equipped with physical and technological resources, the development of emergency procedures, the training of the teams involved, drill planning, and a policy for interactions with community members and the media in the course of a crisis. This paper aims at proposing actions in case an emergency affects the surroundings areas to the accident site. The outlined propositions are not to be adopted only under nuclear or radiological emergencies, since Brazil has specific legislation for this purpose, as established in the Brazilian Nuclear Program Protection System (SIPRON), in addition to the structures and contingency plans currently implemented, validated and periodically tested. (author)

  7. Contingency planning for nuclear plants: an approach for use in industrial plants and hazardous products storage facilities

    International Nuclear Information System (INIS)

    Carvalho, Paulo Roberto Werneck de; Hora, Antonio Ferreira da

    2015-01-01

    The purpose of this paper is establishing a basic system model for the development of contingency plans for emergencies. This includes the identification of agents involved in aid and assistance planning, pointing out communication chains among them, the delegation of action coordination and control, as well as the composition and structure of crisis centers equipped with physical and technological resources, the development of emergency procedures, the training of the teams involved, drill planning, and a policy for interactions with community members and the media in the course of a crisis. This paper aims at proposing actions in case an emergency affects the surroundings areas to the accident site. The outlined propositions are not to be adopted only under nuclear or radiological emergencies, since Brazil has specific legislation for this purpose, as established in the Brazilian Nuclear Program Protection System (SIPRON), in addition to the structures and contingency plans currently implemented, validated and periodically tested. (author)

  8. State planning for winter energy emergencies: workshop materials

    Energy Technology Data Exchange (ETDEWEB)

    1978-04-01

    Workshops were conducted in 5 cities to improve communications between the states and the Federal government so that both might be better prepared to avoid or mitigate the impacts of energy emergencies during the winter; to provide a forum for the exchange of technical information regarding selected energy demand restraint measures which could be implemented by individual states or regions in an energy emergency; and to promote the concept of pre-crisis contingency planning and strategy development, with particuliar emphasis on the need for interstate coordination of emergency plans. The major topics addressed by the discussion guide involved net energy use impact, implementation procedures and problems, and social and economic effects. The Task Force performed extensive research into the technical considerations and prior experience in implementing each of the demand restraint measures selected for discussion. Results and conclusions are summarized for reduction of thermostat setting for space conditioning and water heating; reduction in hours of operation and lighting in commercial establishments; reduction in hours of operation in school, and industrial fuel substitution. (MCW)

  9. Criteria for selection of fuel cycle and major materials licenses needing radiological contingency plans. Regulatory report

    International Nuclear Information System (INIS)

    Fisher, F.D.

    1981-07-01

    Quantities of NRC-licensed radioisotopes requiring the licensee to develop and submit radiological contingency planning information to the NRC for review and approval are developed and presented as limiting possession limits and conditions of possession

  10. Contestation, contingency, and justice in the Nordic low-carbon energy transition

    International Nuclear Information System (INIS)

    Sovacool, Benjamin K.

    2017-01-01

    The five Nordic countries have aggressive climate and energy policies in place and have already emerged to be leaders in renewable energy and energy efficiency. Denmark is renowned for its pioneering use of wind energy, Finland and Sweden bioenergy, Norway hydroelectricity and Iceland geothermal energy. All countries aim to be virtually “fossil free” by 2050. This study explores the Nordic energy transition through the lens of three interconnected research questions: How are they doing it? What challenges exist? And what broader lessons result for energy policy? The study firstly investigates the pathways necessary for these five countries to achieve their low-carbon goals. It argues that a concerted effort must be made to (1) promote decentralized and renewable forms of electricity supply; (2) shift to more sustainable forms of transport; (3) further improve the energy efficiency of residential and commercial buildings; and (4) adopt carbon capture and storage technologies for industry. However, the section that follows emphasizes some of the empirical barriers the Nordic transition must confront, namely political contestation, technological contingency, and social justice and recognition concerns. The study concludes with implications for what such historical progress, and future transition pathways, mean for both energy researchers and energy planners. - Highlights: • Nordic countries have strong energy and climate policies to be practically “fossil free” by 2050. • Decarbonization and transition pathways depend on renewable energy, efficiency, transport, and industry. • The Nordic transition remains contingent on further technological innovations and policy commitments. • It also raises energy justice issues concerning employment, public knowledge, and embodied emissions.

  11. Australian contingency plans for emergency animal disease control: the role of antigen/vaccine banks.

    Science.gov (United States)

    Tweddle, N E

    2004-01-01

    Vaccination is an important element of contingency plans for many animal diseases. The decision whether or not to use vaccine is complex, and must consider epidemiological, economic and social issues. Vaccines are rarely available in a country for emergency animal diseases unless a low pathogenicity strain of the agent is present or it is localised in carrier hosts. High quality commercial vaccine from overseas is often the preferred source of vaccine in an emergency, although less reliable sources may be used with additional safeguards. Alternatively, master seeds may be imported or developed for production within the country For contingency planning, diseases may be ranked according to the expected role of vaccine in the disease eradication strategy, with diseases for which vaccine is part of the initial response strategy receiving highest priority for action. A range of preparedness options is available, ranging from identifying producers of vaccine, obtaining permits for import and use from regulatory authorities, to establishing vaccine or antigen banks. Countries need to consider their individual situations and develop strategies to address the diseases of significance to them.

  12. 77 FR 30266 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2012; William D. Ford...

    Science.gov (United States)

    2012-05-22

    ... DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2012; William D. Ford Federal Direct Loan Program AGENCY: Federal Student Aid, Department of Education... announces the annual updates to the ICR plan formula for 2012. Under the William D. Ford Federal Direct Loan...

  13. 77 FR 20796 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2011; William D. Ford...

    Science.gov (United States)

    2012-04-06

    ... DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2011; William D. Ford Federal Direct Loan Program AGENCY: Federal Student Aid, Department of Education... announces the annual updates to the ICR plan formula for 2011. Under the William D. Ford Federal Direct Loan...

  14. 105-DR Large Sodium Fire Facility Supplemental Information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Edens, V.G.

    1998-05-01

    This document is a unit-specific contingency plan for the 105-DR Large Sodium Fire Facility and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of Washington Administrative Code (WAC) 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units.The LSFF occupied the former ventilation supply fan room and was established to provide a means of investigating fire and safety aspects associated with large sodium or other metal alkali fires. The unit was used to conduct experiments for studying the behavior of molten alkali metals and alkali metal fires. This unit had also been used for the storage and treatment of alkali metal dangerous waste. Additionally, the Fusion Safety Support Studies programs sponsored intermediate-size safety reaction tests in the LSFF with lithium and lithium-lead compounds. The LSFF, which is a RCRA site, was partially clean closed in 1995 and is documented in 'Transfer of the 105-DR Large Sodium Fire Facility to Bechtel Hanford, Inc.' (BHI 1998). In summary, the 105-DR supply fan room (1720-DR) has been demolished, and a majority of the surrounding soils were clean-closed. The 117-DR Filter Building, 116-DR Exhaust Stack, 119- DR Sampling Building, and associated ducting/tunnels were not covered under this closure

  15. Application of Planned Behavior Theory to Account for College Students' Occupational Intentions in Contingent Employment

    Science.gov (United States)

    Huang, Jie-Tsuen

    2011-01-01

    The purpose of this study was to apply Ajzen's (1991) theory of planned behavior to examine college students' intentions to engage in contingent employment. Data were collected from 845 students in 8 colleges and universities in Taiwan. The results of structural equation modeling analyses indicated that both attitude and subjective norms were…

  16. Real-time laboratory exercises to test contingency plans for classical swine fever: experiences from two national laboratories.

    Science.gov (United States)

    Koenen, F; Uttenthal, A; Meindl-Böhmer, A

    2007-12-01

    In order to adequately and efficiently handle outbreaks of contagious diseases such as classical swine fever (CSF), foot and mouth disease or highly pathogenic avian influenza, competent authorities and the laboratories involved have to be well prepared and must be in possession of functioning contingency plans. These plans should ensure that in the event of an outbreak access to facilities, equipment, resources, trained personnel, and all other facilities needed for the rapid and efficient eradication of the outbreak is guaranteed, and that the procedures to follow are well rehearsed. It is essential that these plans are established during 'peace-time' and are reviewed regularly. This paper provides suggestions on how to perform laboratory exercises to test preparedness and describes the experiences of two national reference laboratories for CSF. The major lesson learnt was the importance of a well-documented laboratory contingency plan. The major pitfalls encountered were shortage of space, difficulties in guaranteeing biosecurity and sufficient supplies of sterile equipment and consumables. The need for a standardised laboratory information management system, that is used by all those involved in order to reduce the administrative load, is also discussed.

  17. Contingency proportion systematically influences contingency learning.

    Science.gov (United States)

    Forrin, Noah D; MacLeod, Colin M

    2018-01-01

    In the color-word contingency learning paradigm, each word appears more often in one color (high contingency) than in the other colors (low contingency). Shortly after beginning the task, color identification responses become faster on the high-contingency trials than on the low-contingency trials-the contingency learning effect. Across five groups, we varied the high-contingency proportion in 10% steps, from 80% to 40%. The size of the contingency learning effect was positively related to high-contingency proportion, with the effect disappearing when high contingency was reduced to 40%. At the two highest contingency proportions, the magnitude of the effect increased over trials, the pattern suggesting that there was an increasing cost for the low-contingency trials rather than an increasing benefit for the high-contingency trials. Overall, the results fit a modified version of Schmidt's (2013, Acta Psychologica, 142, 119-126) parallel episodic processing account in which prior trial instances are routinely retrieved from memory and influence current trial performance.

  18. Coordinated Control of Distributed and Bulk Energy Storage for Alleviation of Post-Contingency Overloads

    Directory of Open Access Journals (Sweden)

    Yunfeng Wen

    2014-03-01

    Full Text Available This paper presents a novel corrective control strategy that can effectively coordinate distributed and bulk energy storage to relieve post-contingency overloads. Immediately following a contingency, distributed batteries are implemented to provide fast corrective actions to reduce power flows below their short-term emergency ratings. During the long-term period, Pumped Hydro Storage units work in pumping or generation mode to aid conventional generating units keep line flows below the normal ratings. This problem is formulated as a multi-stage Corrective Security-constrained OPF (CSCOPF. An algorithm based on Benders decomposition was proposed to find the optimal base case solution and seek feasible corrective actions to handle all contingencies. Case studies based on a modified RTS-96 system demonstrate the performance and effectiveness of the proposed control strategy.

  19. Resource Conservation and Recovery Act (RCRA) contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-08-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  20. Power plant construction lead times: The value of contingency planning

    International Nuclear Information System (INIS)

    Rubin, L.J.

    1985-01-01

    In this paper an analysis of two different approaches to the construction of a major power plant (nuclear) is presented. The analysis compares an accelerated, ''go-for-broke'' strategy-which has some risk of being delayed-with a more deliberate contingency construction schedule in terms of revenue requirements and costs of electricity. It is demonstrated that under a wide variety of circumstances there are important advantages to the contingency strategy, but that the magnitude of those advantages is sensitive to the character of the power system being examined and to the flexibility of the contingency approach

  1. Contingency Contracting within the Department of Defense: A Comparative Analysis

    National Research Council Canada - National Science Library

    McMillion, Chester

    2000-01-01

    .... The thesis compares and contrasts the regulations governing the contingency contracting operations, the organization structure, contingency contracting support plans, and the training requirements...

  2. Resource Conservation and Recovery Act (RCRA) general contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    Skaggs, B.E.

    1993-11-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures herein can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  3. 25 CFR 39.501 - What is an emergency or unforeseen contingency?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is an emergency or unforeseen contingency? 39.501... EQUALIZATION PROGRAM Contingency Fund § 39.501 What is an emergency or unforeseen contingency? An emergency or unforeseen contingency is an event that meets all of the following criteria: (a) It could not be planned for...

  4. State-of-the-art risk-based approach to spill contingency planning and risk management

    International Nuclear Information System (INIS)

    Schmidt Etkin, Dagmar; Reilly, Timothy; French McCay, Deborah

    2011-01-01

    The paper proposes incorporating a comprehensive examination of spill risk into risk management and contingency planning, and applying state-of-the-art modeling tools to evaluate various alternatives for appropriate spill response measures and optimize protective responses. The approach allows spill contingency planners and decision-makers to determine the types of spill scenarios that may occur in a particular location or from a particular source and calculate the probability distribution of the various scenarios. The spill probability information is useful in assessing and putting into perspective the various costs options for spill control systems that will be recommended ultimately. Using advanced modeling tools helps in estimating the potential environmental and socioeconomic consequences of each spill scenario based on location-specific factors over a range of stochastic possibilities, simulating spill scenarios and determining optimal responses and protection strategies. The benefits and costs of various response alternatives and variations in response time can be calculated and modeling tools for training and risk allocation/transfer purposes used.

  5. 78 FR 33395 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2013-William D. Ford...

    Science.gov (United States)

    2013-06-04

    ... DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2013--William D. Ford Federal Direct Loan Program Catalog of Federal Domestic Assistance (CFDA) Number... free, at 1- 800-877-8339. SUPPLEMENTARY INFORMATION: Under the William D. Ford Federal Direct Loan...

  6. Contingency plan for deployment of the void fraction instrument in Tank 241-AY-102

    International Nuclear Information System (INIS)

    CONNER, J.M.

    1999-01-01

    High-heat producing sludge from tank 241-C-106 will be sluiced and transferred to tank 241-AY-102 beginning in October 1998. Safety analyses have postulated that after retrieval, the waste in 241-AY-102 may generate and retain unsafe levels of flammable gases (Noorani 1998, Pasamebmetoglu etal. 1997). Unsafe levels of retained gas are not expected, but cannot be ruled out because of the large uncertainty in the gas generation and retention rates. The Tank Waste Remediation System Basis for Interim Operation (Noorani 1998) identifies the need for a contingency plan to add void fraction monitoring to tank 241-AY-102 within 2 weeks of the identification of flammable gas buildup that would warrant monitoring. The Tank 241-C-106 Waste Retrieval Sluicing System Process Control Plan (Carothers et al. 1998) committed to providing a contingency plan for deployment of the void fraction instrument (VFI) in tank 241-AY-102. The VFI determines the local void fraction of the waste by compressing a waste sample captured in a gas-tight test chamber. The sample chamber is mounted on the end of a 76-cm (2.5-ft) arm that can be rotated from vertical to horizontal when the instrument is deployed. Once in the waste, the arm can be positioned horizontally and rotated to sample in different areas below the riser. The VFI is deployed using a crane. The VFI has been deployed previously in 241-AW, 241-AN, and 241-SY tank farms, most recently in tank 241-SY-101 in June and July 1998. An additional test in tank 241-SY-101 is planned in September 1998. Operating instructions for the VFI are included in the Void Fraction Instrument Operation and Maintenance Manual (Pearce 1994)

  7. Resource conversation and recovery act (RCRA) Contingency Plan for interim status or permitted units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1992-08-01

    The official mission of the Y-12 Plant is to serve as a manufacturing technology center for key processes such that capabilities are maintained for safe, secure, reliable, and survivable nuclear weapons systems and other applications of national importance. The Y-12 RCRA Contingency Plan will be reviewed and revised if necessary if the facility RCRA operating permits are revised, the plan is inadequate in an emergency, the procedures herein can be improved, the facility's operations change in a manner that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Preparedness Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste interim status or permitted treatment, storage, or disposal facilities. The 90-day storage areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  8. Estimating willingness to pay for renewable energy in South Korea using the contingent valuation method

    International Nuclear Information System (INIS)

    Lee, Chul-Yong; Heo, Hyejin

    2016-01-01

    The importance of renewable energy as a response to climate change is universally acknowledged. However, its successful implementation requires public approval and cooperation. This study aims to identify the level of renewable energy acceptance in Korea by estimating Korean consumers’ additional willingness to pay (WTP) using the contingent valuation (CV) method, which is the most widely used to analyze consumer preferences. The estimation results indicate that Korean consumers are willing to pay an additional USD 3.21 per month for electricity generated with renewable energy. However, WTP in Korea is low relative to other advanced nations, indicating that these values could be influenced through policies aimed at improving knowledge and acceptance of renewable energy sources among Korean consumers. - Highlights: •Measures renewable energy acceptance in Korea with willingness to pay (WTP) estimates. •Contingent valuations estimate WTP overall and by consumer characteristics. •WTP in Korea doubled since the Fukushima disaster, but lags other advanced countries. •Policies must improve acceptance of renewables to enable construction of facilities.

  9. A High Performance System With Explicit Incorporation of ATC Regulations to Generate Contingency Plans for UAVs with Lost Communication, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose a comprehensive and systematic contingency plan generation framework to deal with lost communication in UAVs. ATC regulations are explicitly incorporated...

  10. Analyzing Contingency Contracting Purchases for Operation Iraqi Freedom (Unrestricted Version)

    National Research Council Canada - National Science Library

    Baldwin, Laura H; Ausink, John A; Campbell, Nancy F; Drew, John G; Roll, Jr, Charles R

    2008-01-01

    ...) in an effort to determine the size and extent of contractor support, and how plans for and the organization and execution of contingency contracting activities might be improved so that Contingency...

  11. 241-CX-70, 241-CX-71, and 241-CX-72 underground storage tanks at the strontium semiworks facility supplemental information to the Hanford Facility Contingency Plan

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-03-01

    This document is a unit-specific contingency plan for the underground storage tanks at the Strontium Semiworks Facility and is intended to be used as a supplement to the Hanford Facility Contingency Plan. This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of WAC 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units. Radioactive material is contained in three underground storage tanks: 241-CX-70, 241-CX-71, and 241-CX-72. Tank 241-CX-70 has been emptied, except for residual quantities of waste, and has been classified as an elementary neutralization tank under the RCRA. Tanks 241-CX-71 and 241-CX-72 contain radioactive and Washington State-only dangerous waste material, but do not present a significant hazard to adjacent facilities, personnel, or the environment. Currently, dangerous waste management activities are not being applied at the tanks. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the Strontium Semiworks Facility

  12. Defense Infrastructure: Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency Operations

    Science.gov (United States)

    2016-09-01

    supporting documentation for reviews that the U.S. Forces-Afghanistan conducted beginning in November 2011 of planned or ongoing contingency ...12 Contingency basing includes the planning , designing, constructing, operating, managing, and transitioning or closing of a non-enduring location...2016). Background Definition of “ Contingency Construction” Project Page 7 GAO-16-406 Defense Infrastructure statutory authority

  13. A guide to contingency planning for oil spills on water. V. 2

    International Nuclear Information System (INIS)

    1997-01-01

    The movement of oil from the dominant production centres of the world to the world-wide market is primarily achieved by the use of tankers and pipelines. The global pattern of marine transport is well established as shown in Figure 1, below. While the environmental priority for all tanker operations is the prevention of spills, it is recognized that marine spills are a factor for which management must plan. This report, which is prepared for those managements in industry and government, describes the elements of the contingency planning process. It stresses the importance of cooperative activity between industry and government. It presents a consensus view of the IPIECA membership which is representative of the international oil industry. It reflects current informed thinking in the light of the extensive individual company and industry organization reviews that have taken place since the Exxon Valdez and other major incidents in 1989/90. This report has drawn freely on many of these reviews, some of which have been published. (UK)

  14. Contingency plan for the Lawrence Livermore National Laboratory, Site 300, hazardous waste operations

    International Nuclear Information System (INIS)

    Gonzalez, M.A.

    1983-01-01

    This contingency plan for hazardous waste release provides guidance for coordinating response efforts. With a goal to minimize hazards to human health and life; and protect livestock, wildlife, the environment, and property in the event of a fire, explosion, or any unplanned release of hazardous substances or mixtures to the air, water, or soil. In this document, hazardous waste includes all waste substances or mixtures that: contain any of the hazardous substances listed in the Resource Conservation and Recovery Act; have the characteristic of being toxic, flammable, reactive, corrosive, an irritant, and/or a strong sensitizer; are radioactive and are used in experiments at Site 300; or could have a significant effect on the environment. This Plan includes an overview of emergency response capabilities; and responsibilities assigned to both LLNL and non-LLNL emergency response personel

  15. Sweden; Financial Sector Assessment Program Update: Technical Note on Contingency Planning, Crisis Management and Bank Resolution

    OpenAIRE

    International Monetary Fund

    2011-01-01

    This abstract reviews the recommendations made in the FSAP Update for Sweden in the areas of contingency planning, crisis management, and bank resolution. Although Sweden crisis management fared well during the global financial crisis, its authorities are reviewing the framework for managing financial crises to incorporate crisis lessons. They recommend a domestic institutional framework, an effective cross-border cooperation, an emergency liquidity assistance (ELA), a deposit guarantee schem...

  16. Contingency planning for oil spill response: A program of joint IMO/oil industry regional seminars

    International Nuclear Information System (INIS)

    Bavister, R.; Wonham, J.

    1993-01-01

    Cooperative efforts between the oil industry and governments at the national and local levels have resulted in a series of reports for both technical and general audiences on subjects relating to oil spills, as well as an ongoing series of government/industry regional seminars for senior executives. The seminars emphasize the crucial importance of joint government/industry attention to contingency planning. These activities, which are continuing, are organized under the auspices of an International Petroleum Industry Environmental Conservation Association working group, and the International Maritime Organization. Feedback is solicited from seminar participants for use in planning further seminars and to give the IMO a clear picture of follow up activities that have resulted from the seminars

  17. Contingency Management of Health Care Organizations: It Depends.

    Science.gov (United States)

    Olden, Peter C

    Managers in health care organizations (HCOs) must perform many processes and activities, such as planning goals, designing organization structure, leading people, motivating employees, making decisions, and resolving conflict. How they do all this strongly affects the performance and outcomes of their organizations and themselves. Some managers develop a usual way of performing their jobs and achieve some success with a preferred method of leading or a favorite approach to motivating. However, their success will be limited if they always rely on a standard "1-size-fits-all" approach. This is because contingency factors influence the effectiveness of a given approach to managing. The "best" approach depends on contingency factors, including the situation and the people involved. Managers should choose an approach to fit with the changing contingency factors. This article explains why and how managers should develop a contingency approach to managing HCOs. The development of contingency theory is briefly described. Practical application of contingency management is explained for leading, motivating, decision making, and resolving conflict. By using a contingency approach, managers can be more effective when managing their HCOs.

  18. Robinson Rancheria Strategic Energy Plan; Middletown Rancheria Strategic Energy Plan, Scotts Valley Rancheria Strategic Energy Plan, Elem Indian Colony Strategic Energy Plan, Upperlake Rancheria Strategic Energy Plan, Big Valley Rancheria Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    McGinnis and Associates LLC

    2008-08-01

    The Scotts Valley Band of Pomo Indians is located in Lake County in Northern California. Similar to the other five federally recognized Indian Tribes in Lake County participating in this project, Scotts Valley Band of Pomo Indians members are challenged by generally increasing energy costs and undeveloped local energy resources. Currently, Tribal decision makers lack sufficient information to make informed decisions about potential renewable energy resources. To meet this challenge efficiently, the Tribes have committed to the Lake County Tribal Energy Program, a multi Tribal program to be based at the Robinson Rancheria and including The Elem Indian Colony, Big Valley Rancheria, Middletown Rancheria, Habematolel Pomo of Upper Lake and the Scotts Valley Pomo Tribe. The mission of this program is to promote Tribal energy efficiency and create employment opportunities and economic opportunities on Tribal Lands through energy resource and energy efficiency development. This program will establish a comprehensive energy strategic plan for the Tribes based on Tribal specific plans that capture economic and environmental benefits while continuing to respect Tribal cultural practices and traditions. The goal is to understand current and future energy consumption and develop both regional and Tribe specific strategic energy plans, including action plans, to clearly identify the energy options for each Tribe.

  19. Measuring the social value of nuclear energy using contingent valuation methodology

    International Nuclear Information System (INIS)

    Jun, Eunju; Joon Kim, Won; Hoon Jeong, Yong; Heung Chang, Soon

    2010-01-01

    As one of the promising energy sources for the next few decades, nuclear energy receives more attention than before as environmental issues become more important and the supply of fossil fuels becomes unstable. One of the reasons for this attention is based on the rapid innovation of nuclear technology which solves many of its technological constraints and safety issues. However, regardless of these rapid innovations, social acceptance for nuclear energy has been relatively low and unchanged. Consequently, the social perception has often been an obstacle to the development and execution of nuclear policy requiring enormous subsidies which are not based on the social value of nuclear energy. Therefore, in this study, we estimate the social value of nuclear energy-consumers' willingness-to-pay for nuclear energy-using the Contingent Valuation Method (CVM) and suggest that the social value of nuclear energy increases approximately 68.5% with the provision of adequate information about nuclear energy to the public. Consequently, we suggest that the social acceptance management in nuclear policy development is important along with nuclear technology innovation.

  20. Optimal Nonlinear Pricing, Bundling Commodities and Contingent Services

    International Nuclear Information System (INIS)

    Podesta, Marion; Poudou, Jean-Christophe

    2008-01-01

    In this paper, we propose to analyze optimal nonlinear pricing when a firm offers in a bundle a commodity and a contingent service. The paper studies a mechanism design where all private information can be captured in a single scalar variable in a monopoly context. We show that to propose the package for commodity and service is less costly for the consumer, the firm has lower consumers' rent than the situation where it sells their good and contingent service under an independent pricing strategy. In fact, the possibility to use price discrimination via the supply of package is dominated by the fact that it is costly for the consumer to sign two contracts. Bundling energy and a contingent service is a profitable strategy for a energetician monopoly practising optimal nonlinear tariff. We show that the rates of the energy and the contingent service depend to the optional character of the contingent service and depend to the degree of complementarity between commodities and services. (authors)

  1. Detailed oil spill contingency analysis in establishment of preparedness plans for exploration drilling in environmentally sensitive areas: an integrated management process

    Energy Technology Data Exchange (ETDEWEB)

    Spikkerud, Cathrine S.; Skeie, Geir Morten; Brude, Odd Willy; Gravir, Gjermund [DNV Managing Risk, Oslo (Norway)

    2008-07-01

    This paper describes the integrated management process leading up to a dynamic oil spill preparedness plan based on detailed analysis of oil spill contingency requirements and environmental risk in environmentally sensitive areas. Starting with a detailed environmental risk and oil spill contingency analysis, oil spill preparedness plans are developed. These plans are generic for the area possibly affected by an oil spill, and are developed in detail for environmental 'hot spots' that are highly challenging in terms of oil spill response. The detailed plans make use of detailed data sets on shoreline substrate sensitivities and cleanup methodology, photographic inventory, logistical issues and access to real-time incident data for important areas. This detailed approach ensures sufficient knowledge about the sensitive area in advance to provide fast and correct strategic and tactical operational recovery decisions. A final element of the integrated process is a web based GIS, providing all parties involved with one common situation overview, ensuring that the facts remain in focus throughout the operation and that those responsible for informing stake-holders have access to correct and timely updated information. (author)

  2. Contingency Teaching during Close Reading

    Science.gov (United States)

    Fisher, Douglas; Frey, Nancy

    2015-01-01

    12 teachers were interviewed and observed as they engaged students in close reading. We analyzed their responses and instruction to determine the scaffolds that were used as well as the contingency teaching plans they implemented when students were unable to understand the text.

  3. Volcanic Eruption: Students Develop a Contingency Plan

    Science.gov (United States)

    Meisinger, Philipp; Wittlich, Christian

    2013-04-01

    , causing a blockage and afflux of the Rhine, which, due to the given conditions of a very narrow valley, would lead to excessive flooding affecting even the greater Rhine-Main-region. Not to mention the consequences of a pyroclastic flow, dropping volcanic bombs and further hazardous/disastrous consequences. In comparison to other "potentially active" or "active volcanoes", e.g. the Vesuvius, the Laacher See is scarcely monitored and according to recent publications poorly analyzed in terms of contingency and evacuation plans. This offers space for critical analysis and creative solutions to an existing problem. Short: We need geographers and their knowledge to provide help. Given these facts, the Laacher See could be the layout for a very interesting geography project bringing together previously gained knowledge and understanding of volcanic activities, their destructive powers, consequences and risks in case of an eruption in combination with their topographical characteristics. Your students thereby act the role of a geoscientist developing contingency plans and evacuation zones for the greater Laacher See area. This involves a detailed analysis of the topographical characteristics based on (classic) topographic maps or online via the use of a GIS (e.g. Google maps). In a second step students enlist the possible consequences they already know according to their range and copy them onto a transparency layer on the topographic map. Using such a layer technique students add population density, important topographic features and maybe even anticipated wind directions to their map. The information density and the specific layout of this map are thereby only determined by the student's previous knowledge, their personal abilities and skills and the amount of time provided. This offers the opportunities to even differentiate the task within your group and provide support adjusted to the individual students level. On the basis of their own thematic map your students should be

  4. Contingency plan improvement for managing oil spills in the coastal waters of Thailand.

    Science.gov (United States)

    Singkran, Nuanchan

    2014-12-15

    The estimated risks of being impacted by oil spills in the coastal waters were used to improve the oil spill contingency plan of Thailand. Functional roles of local agencies are integrated into the plan. Intensive measures are suggested for the coastal provinces located in high-very high risk zones, whereas light and moderate measures are suggested for the coastal provinces located in low and moderate risk zones, respectively. The estimated percentage risks due to simulated oil slicks hitting the coast and/or important resources (PRoilspill) were used to guide the year-round water activities that should be carefully handled at a certain radius with a low-moderate PRoilspill, whereas they should be avoided at a certain radius with a high-very high PRoilspill. Important measures before, during, and post periods of an oil spill incident are suggested to prevent and monitor oil spill incidents and mitigate their impacts on the environment. Copyright © 2014 Elsevier Ltd. All rights reserved.

  5. Energy Efficiency Plan 2009-2012; Energie Efficiency Plan 2009-2012

    Energy Technology Data Exchange (ETDEWEB)

    Meulen, M.M.W. (ed.)

    2009-02-15

    The aim of the Energy Efficiency Plan is to give an overview of the energy conservation plans of the Eindhoven University of Technology in Eindhoven, Netherlands, which must result in efficient use of energy conform the long-range agreements between businesses, industry and organizations and the Dutch government to improve energy efficiency (MJA3) [Dutch] Het doel van het EEP (Energie Efficiency Plan) is het in beeld brengen van de energiebesparingsplannen die leiden tot een efficienter gebruik van energie conform de MJA-3 afspraak (de derde Meerjaren Afspraak)

  6. Effective communications system for a national oil spill contingency plan in Nigeria

    International Nuclear Information System (INIS)

    Adeyemi-Wilson, O.A.

    1991-01-01

    This paper describes what constitute an Effective Communications System for a National Oil Spill Contingency Plan. It discusses the system available in Nigeria for the oil exploration and producing companies, the Nigerian National Petroleum Corporation (NNPC) and the only oil spill response cooperative, the Clean Nigeria Associates (CNA). The Emergency Communications System which the companies had in place for some time, but is no longer functioning because of bureaucratic problems, is mentioned. The paper also mentioned the need to integrate the various separate systems already in use to provide effective communication for proper oil spill response. It recognizes the need for support from the Ministry of Communications and the two government agencies, NITEL and NET which provide telephone services in Nigeria. A proposed Effective Communications System for Nigeria is described

  7. Ensuring the Reliable Operation of the Power Grid: State-Based and Distributed Approaches to Scheduling Energy and Contingency Reserves

    Science.gov (United States)

    Prada, Jose Fernando

    Keeping a contingency reserve in power systems is necessary to preserve the security of real-time operations. This work studies two different approaches to the optimal allocation of energy and reserves in the day-ahead generation scheduling process. Part I presents a stochastic security-constrained unit commitment model to co-optimize energy and the locational reserves required to respond to a set of uncertain generation contingencies, using a novel state-based formulation. The model is applied in an offer-based electricity market to allocate contingency reserves throughout the power grid, in order to comply with the N-1 security criterion under transmission congestion. The objective is to minimize expected dispatch and reserve costs, together with post contingency corrective redispatch costs, modeling the probability of generation failure and associated post contingency states. The characteristics of the scheduling problem are exploited to formulate a computationally efficient method, consistent with established operational practices. We simulated the distribution of locational contingency reserves on the IEEE RTS96 system and compared the results with the conventional deterministic method. We found that assigning locational spinning reserves can guarantee an N-1 secure dispatch accounting for transmission congestion at a reasonable extra cost. The simulations also showed little value of allocating downward reserves but sizable operating savings from co-optimizing locational nonspinning reserves. Overall, the results indicate the computational tractability of the proposed method. Part II presents a distributed generation scheduling model to optimally allocate energy and spinning reserves among competing generators in a day-ahead market. The model is based on the coordination between individual generators and a market entity. The proposed method uses forecasting, augmented pricing and locational signals to induce efficient commitment of generators based on firm

  8. Guide to oil spill exercise planning

    International Nuclear Information System (INIS)

    1996-01-01

    The International Convention on Oil Pollution Preparedness, Response and Cooperation (OPRC Convention) foresees a future in which all at risk states have national oil spill preparedness and response plans. The Convention also encourages the idea that national plans be developed in cooperation with oil and shipping industries. The ultimate test of any contingency plan is measured by performance in a real emergency. It is vital, therefore, that any programme for developing a national contingency plan must include an ongoing programme to test the plan through realistic exercises. An exercise programme must progressively prepare the Oil Spill Energy Response Team to perform effectively in realistic representations of the risks that the contingency plan has been designed to meet. This report has been designed to guide all those in government or industry who are faced with the responsibility of developing and managing oil spill response exercises at all levels. It carries with it the authority that derives from peer review by many centres of oil spill response excellence around the world. It is well-illustrated with brief case histories of exercises that have been carried out by many IPIECA member companies. Each of those companies has indicated its preparedness to share more information by providing contact name and address details within this report. (author)

  9. Thomas Aquinas on Contingency of Nature

    Czech Academy of Sciences Publication Activity Database

    Dvořák, Petr

    2008-01-01

    Roč. 5, č. 2 (2008), s. 185-196 ISSN 1214-8407 R&D Projects: GA AV ČR(CZ) IAA900090602 Institutional research plan: CEZ:AV0Z90090514 Keywords : Thomas Aquinas * determinism * contingency Subject RIV: AA - Philosophy ; Religion

  10. Contingency planning for rapid reduction of greenhouse gas emissions

    Directory of Open Access Journals (Sweden)

    Larsson, Nils K.

    2010-03-01

    Full Text Available The current and predicted levels of greenhouse gas (GHG emissions are, according to the best international scientific estimates, leading the world towards climate change that will have serious consequences for all countries. The problem is aggravated by the tendency of people and institutions not to take action until catastrophic consequences emerge. The history of crises in other sectors show us that reactions are likely to focus on ad-hoc reactions or using plans that are readily available, with negative results. However, the alternative of developing public plans for drastic and rapid reductions is not likely to gain support because of their radical nature. The author therefore proposes that large organizations with direct or indirect control over substantial GHG emissions should prepare private contingency plans for very rapid reductions in emissions, so that more rational and less destructive plans will be available when the appropriate moment comes for last-minute action. Examples of the type of specific plans that may be appropriate are suggested.

    Según las estimaciones científicas internacionales más optimistas, los niveles actuales y previstos de emisiones de gases de efecto invernadero (GEI están llevando al mundo hacia un cambio climático que tendrá graves consecuencias para todos los países. El problema se ve agravado por la tendencia de personas e instituciones a no tomar medidas hasta que no se perciben las catastróficas consecuencias. El historial de crisis ocurridas en otros sectores nos demuestra que las reacciones probablemente se centren en medidas ad hoc o en emplear planes que ya existían, pero sin resultados. Sin embargo, es poco probable que la alternativa al desarrollo de planes públicos para las reducciones drásticas y rápidas consiga el apoyo necesario, debido precisamente a su radicalidad. El autor recomienda por tanto que las grandes organizaciones que tengan control directo o indirecto sobre un

  11. National Energy Plan II

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    This volume contains the Administration's second National Energy Plan, as required by section 801 of the Department of Energy Organization Act (Public Law 95-91). A second volume will contain an assessment of the environmental trends associated with the energy futures reported here. Detailed appendices to the Plan will be published separately. The eight chapters and their subtitles are: Crisis and Uncertainty in the World Energy Future (The Immediate Crisis and the Continuing Problem, The Emergence of the Energy Problem, The Uncertainties of the World Energy Future, World Oil Prices, Consequences for the U.S.); The U.S. Energy Future: The Implications for Policy (The Near-, Mid-, and Long-Term, The Strategy in Perspective); Conservation (Historical Changes in Energy Use, Post-Embargo Changes - In Detail, Conservation Policies and Programs, The Role of Conservation); Oil and Gas (Oil, Natural Gas); Coal and Nuclear (Coal, Nuclear, Policy for Coal and Nuclear Power); Solar and Other Inexhaustible Energy Sources (Solar Energy, Geothermal, Fusion, A Strategy for Inexhaustible Resources); Making Decisions Promptly and Fairly (Managing Future Energy Crises: Emergency Planning, Managing the Current Shortfall: The Iranian Response Plan, Managing the Long-Term Energy Problem: The Institutional Framework, Fairness in Energy Policy, Public Participation in the Development of Energy Policy); and NEP-II and the Future (The Second National Energy Plan and the Nation's Energy Future, The Second National Energy Plan and the Economy, Employment and Energy Policy, The Second National Energy Plan and Individuals, The Second National Energy Plan and Capital Markets, and The Second National Energy Plan and the Environment). (ERA citation 04:041097)

  12. Contingency plans and successful response strategies for oil spills into rivers

    Energy Technology Data Exchange (ETDEWEB)

    Owens, Edward H. [Polaris Applied Sciences Inc., Bainbridge Island, WA (United States)]. E-mail: ehowens@polarisappliedsciences.com

    2003-07-01

    Oil spilled into a river enters a dynamic environment. An effective response can only succeed if the dynamics of the river system are understood and if the strategies and tactics are designed to match these conditions. Oil is transported downstream at the speed of the current, therefore, an estimate of the rate of movement is essential to identify effective intercept locations. Boom performance is affected by local surface water velocities as entrainment of oil typically begins when velocities exceed 0.4 m/s. However, boom configurations can be effective in current velocities as great as 2.5 m/s. Response operations can be successful if staging or control locations have been identified as part of contingency planning and if booms are deployed to take into account local surface current characteristics. Tracking and control of submerged or sunken oil is difficult and may not be practical. Recovery operations for sunken oil depend on the channel depth, current velocities, and on the distribution and concentration of the oil. (author)

  13. Probabilistic real-time contingency ranking method

    International Nuclear Information System (INIS)

    Mijuskovic, N.A.; Stojnic, D.

    2000-01-01

    This paper describes a real-time contingency method based on a probabilistic index-expected energy not supplied. This way it is possible to take into account the stochastic nature of the electric power system equipment outages. This approach enables more comprehensive ranking of contingencies and it is possible to form reliability cost values that can form the basis for hourly spot price calculations. The electric power system of Serbia is used as an example for the method proposed. (author)

  14. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-06-01

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment

  15. Effective operational oil spill response planning

    International Nuclear Information System (INIS)

    Meyers, R.J.

    1991-01-01

    An operational Contingency Plan is one of the single most important aspects of effective oil spill response operations. It is a spill control game plan. A thorough contingency plan provides a set of guidelines that can be used to help direct all phases of spill response activities. More than simple a compilation of lists and rosters, the contingency plan reflects strategic and philosophical elements of spill response that help to ensure a viable response to any spill incident. Facilities and oil carrying vessels should have well maintained contingency plans with these features. This paper describes the requirement for effective oil spill response pans and the training required to exercise them

  16. 190-C Facility <90 Day Storage Pad supplemental information to the Hanford facility contingency plan

    International Nuclear Information System (INIS)

    Little, N.C.

    1996-12-01

    The 190-C Facility <90 Day Storage Pad stores waste oils primarily contaminated with lead generated while draining equipment within the building of residual lubricating oils. Waste oils are packaged and stored in fifty-five gallon drums, or other containers permitted by the Site Specific Waste Management Instruction. Bechtel Hanford, Inc. (BHI) manual BHI-EE-02, Environmental Requirements Procedures, references this document. This document is to be used to demonstrate compliance with the contingency plan requirements in Washington Administrative Code, Chapter 173-303, Dangerous Waste Regulations, for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units (units). Refer to BHI-EE-02, for additional information

  17. 216-A-10 Crib supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-A-10 Crib. The Crib is a landfill that received process condensate from the 202-A building Plutonium/Uranium Extraction Plant from 1956 to 1987. The crib has not received waste since March 1987 and will be closed under final facility standards. Waste management activities are no longer required at the crib, and it does not present significant hazard to adjacent units, personnel or the environment. It is unlikely that any incidents presenting hazards to the public health or the environment would occur at the 216-A-10 Crib

  18. 18 CFR 294.101 - Shortages of electric energy and capacity.

    Science.gov (United States)

    2010-04-01

    ... customers; and (ii) It will report any modifications to its contingency plans for accommodating shortages... REGULATORY POLICIES ACT OF 1978 § 294.101 Shortages of electric energy and capacity. (a) Definition of... customers. (4) If a plan for accommodating any shortages of electric energy or capacity affecting its firm...

  19. Dynamic Contingency Analysis Tool

    Energy Technology Data Exchange (ETDEWEB)

    2016-01-14

    The Dynamic Contingency Analysis Tool (DCAT) is an open-platform and publicly available methodology to help develop applications that aim to improve the capabilities of power system planning engineers to assess the impact and likelihood of extreme contingencies and potential cascading events across their systems and interconnections. Outputs from the DCAT will help find mitigation solutions to reduce the risk of cascading outages in technically sound and effective ways. The current prototype DCAT implementation has been developed as a Python code that accesses the simulation functions of the Siemens PSS/E planning tool (PSS/E). It has the following features: It uses a hybrid dynamic and steady-state approach to simulating the cascading outage sequences that includes fast dynamic and slower steady-state events. It integrates dynamic models with protection scheme models for generation, transmission, and load. It models special protection systems (SPSs)/remedial action schemes (RASs) and automatic and manual corrective actions. Overall, the DCAT attempts to bridge multiple gaps in cascading-outage analysis in a single, unique prototype tool capable of automatically simulating and analyzing cascading sequences in real systems using multiprocessor computers.While the DCAT has been implemented using PSS/E in Phase I of the study, other commercial software packages with similar capabilities can be used within the DCAT framework.

  20. National contingency plan product schedule data base

    International Nuclear Information System (INIS)

    Putukian, J.; Hiltabrand, R.R.

    1993-01-01

    During oil spills there are always proposals by the technical community and industry to use chemical agents to help in oil spill cleanups. Federal Clean Water Act regulations require that any chemical agents that the federal on-scene coordinator (FOSC) wants to use for oil cleanup be listed on the US Environmental Protection Agency (EPA) National Contingency Plan (NCP) Product Schedule. Chemical countermeasures are among the most controversial, complex, and time-critical issues facing decision-making officials choosing response methods to use on coastal oil spills. There are situations in which dispersants are likely to be one of the most appropriate counter-measure strategies. Dispersants are most effective when applied to fresh oil, and their effectiveness dramatically decreases as the oil weathers, which can begin in as little as 24 hours. To logistically implement dispersant use, a decision would need to be made within roughly the first 4 hours after the release. Most of the information that the FOSC needs to make the determination to use a specific chemical agent exists in manuals, EPA bulletins, and the published literature. This information is not in an easy-to-use format under field emergency conditions. Hence the need to collect and disseminate the information in an automated data base. The sources for the information in this data base are the following. Published results of tests performed by Environment Canada; EPA bulletins associated with the NCP Product Schedule; Published results of tests by the chemical industry. The data base resides on a Macintosh computer and contains information about 70 NCP products, including dispersants, surface collecting agents, and biological additives. It contains information on physical properties, toxicity, heavy metal content, safety precautions, use conditions, etc

  1. Energy planning in Spain

    International Nuclear Information System (INIS)

    Cortina Garcia, J.

    1995-01-01

    This report aims to describe energy planning in Spain. It briefly analyses the three completed national energy plans (Plan Energetico Nacional, PEN). The fourth PEN 1991-2000 is analysed in detail, by reference to its objectives and characteristics and to developments during its first five years in operation. The Ministry of Industry and Energy has updated PEN en 1995, almost halfway through its period, and this is also summarised. Finally, there are some reflections on the future of energy planning. (Author) 46 refs

  2. International energy options: an agenda for the 1980s

    Energy Technology Data Exchange (ETDEWEB)

    Tempest, P [ed.

    1981-01-01

    Selected papers from the conference are presented under section headings on: global dilemma; government response to the energy crisis; world power politics; capital constraints and opportunities; productivity and employment; energy demand; energy supply; risks and the need for contingency planning; and international energy policies.

  3. Integrated Waste Treatment Unit GFSI Risk Management Plan

    International Nuclear Information System (INIS)

    W. A. Owca

    2007-01-01

    This GFSI Risk Management Plan (RMP) describes the strategy for assessing and managing project risks for the Integrated Waste Treatment Unit (IWTU) that are specifically within the control and purview of the U.S. Department of Energy (DOE), and identifies the risks that formed the basis for the DOE contingency included in the performance baseline. DOE-held contingency is required to cover cost and schedule impacts of DOE activities. Prior to approval of the performance baseline (Critical Decision-2) project cost contingency was evaluated during a joint meeting of the Contractor Management Team and the Integrated Project Team for both contractor and DOE risks to schedule and cost. At that time, the contractor cost and schedule risk value was $41.3M and the DOE cost and schedule risk contingency value is $39.0M. The contractor cost and schedule risk value of $41.3M was retained in the performance baseline as the contractor's management reserve for risk contingency. The DOE cost and schedule risk value of $39.0M has been retained in the performance baseline as the DOE Contingency. The performance baseline for the project was approved in December 2006 (Garman 2006). The project will continue to manage to the performance baseline and change control thresholds identified in PLN-1963, ''Idaho Cleanup Project Sodium-Bearing Waste Treatment Project Execution Plan'' (PEP)

  4. Planning for seven generations: Energy planning of American Indian tribes

    International Nuclear Information System (INIS)

    Brookshire, Daniel; Kaza, Nikhil

    2013-01-01

    The prevalence of energy resources on American Indian lands, the links between energy management and tribal sovereignty, and recent federal government incentives make tribal energy planning an interesting case study for community energy planning in the US. This paper studies the strategic energy planning efforts, energy resource development, and energy efficiency policies established by tribes within the continental US. The paper analyzes the results of a survey of various tribes′ energy resource development and planning efforts and supplements the responses with publicly available information on resources, economics, and demographics. We find that incentives and advisory services from the federal government are key to developing the capacity of the tribes to pursue energy planning and energy resource development. These incentives largely avoid the misdeeds of past federal policy by promoting tribal control over energy planning and energy resource development efforts. Tribes with formal energy plans or visions are more likely to develop energy resources than tribes without them and are engaged in a more comprehensive and sustainable approach to energy resource development and energy efficiency. - Highlights: • American Indian tribal energy planning is an understudied topic. • Tribal energy planning is interconnected with tribal sovereignty and sustainability. • We report the results of a survey of energy planning and development efforts. • Federal Government assistance is critical to the efforts of the tribes. • Tribes with energy plans take a more comprehensive approach to energy resource development

  5. Temporal contingency.

    Science.gov (United States)

    Gallistel, C R; Craig, Andrew R; Shahan, Timothy A

    2014-01-01

    Contingency, and more particularly temporal contingency, has often figured in thinking about the nature of learning. However, it has never been formally defined in such a way as to make it a measure that can be applied to most animal learning protocols. We use elementary information theory to define contingency in such a way as to make it a measurable property of almost any conditioning protocol. We discuss how making it a measurable construct enables the exploration of the role of different contingencies in the acquisition and performance of classically and operantly conditioned behavior. Copyright © 2013 Elsevier B.V. All rights reserved.

  6. Temporal contingency

    Science.gov (United States)

    Gallistel, C.R.; Craig, Andrew R.; Shahan, Timothy A.

    2015-01-01

    Contingency, and more particularly temporal contingency, has often figured in thinking about the nature of learning. However, it has never been formally defined in such a way as to make it a measure that can be applied to most animal learning protocols. We use elementary information theory to define contingency in such a way as to make it a measurable property of almost any conditioning protocol. We discuss how making it a measurable construct enables the exploration of the role of different contingencies in the acquisition and performance of classically and operantly conditioned behavior. PMID:23994260

  7. Energy Organizational Planning

    Energy Technology Data Exchange (ETDEWEB)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty – control and manage their natural resource assets – i.e. develop its own energy resources, meet the current and projected energy needs of their community, and “sit at the table” with other regional energy providers to deal with issues on a peer-to-peer basis.

  8. Wind energy centre at Gujarat State, India. Business plan

    International Nuclear Information System (INIS)

    Van Hulle, F.; Jansen, J.C.; Prasad, N.S.; Suresh, R.

    1997-07-01

    The report describes the business plan for the establishment of a Wind Energy Centre in Gujarat. This Wind Energy Center has to provide a reliable delivery of a range of development and technical quality assurance services to the wind energy industry in northern India on the basis of sustained operations and recovery of all operating costs and - contingent on the way the Centre is financed - at least part of the initial investment costs. Core activities of the Wind Energy Centre are: Research and development supporting activities for the wind energy sector; Testing and certification of wind energy equipment; Consultancy, monitoring and information services; and Training courses on wind energy technology and implementation. The wind energy centre aims with its services at a number of customers: the manufacturing industry, wind farm developers and governmental authorities. An exploration of the market for the services of the envisaged wind energy centre shows that the concept is financially viable. A set of assumptions has been made about the growth rate of the installed wind power capacity in Northern India and about the number of wind turbine manufacturing companies in the target area of the centre. From these assumptions the total number of new wind turbine types coming on the Indian market annually is derived for a period of ten years. These figures have served as a basis for the determination of the required manpower and facilities of the centre for design and development support activities, feasibility and siting studies, testing and certification. Furthermore a projection has been made for providing expert manpower capacity for carrying out R and D, consultancy and other services. 14 tabs., 1 ref

  9. 14 CFR 259.4 - Contingency plan for lengthy tarmac delays.

    Science.gov (United States)

    2010-01-01

    ... (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS ENHANCED PROTECTIONS FOR AIRLINE PASSENGERS § 259.4 Contingency..., assurance that the air carrier will provide adequate food and potable water no later than two hours after... flights covered in paragraph (b)(2) of this section, and for the trigger point for food and water covered...

  10. Using contingent choice methods to assess consumer preferences about health plan design.

    Science.gov (United States)

    Marquis, M Susan; Buntin, Melinda Beeuwkes; Kapur, Kanika; Yegian, Jill M

    2005-01-01

    American insurers are designing products to contain health care costs by making consumers financially responsible for their choices. Little is known about how consumers will view these new designs. Our objective is to examine consumer preferences for selected benefit designs. We used the contingent choice method to assess willingness to pay for six health plan attributes. Our sample included subscribers to individual health insurance products in California, US. We used fitted logistic regression models to explore how preferences for the more generous attributes varied with the additional premium and with the characteristics of the subscriber. High quality was the most highly valued attribute based on the amounts consumers report they are willing to pay. They were also willing to pay substantial monthly premiums to reduce their overall financial risk. Individuals in lower health were willing to pay more to reduce their financial risk than individuals in better health. Consumers may prefer tiered-benefit designs to those that involve overall increases in cost sharing. More consumer information is needed to help consumers better evaluate the costs and benefits of their insurance choices.

  11. Summary statement on emergency planning for transportation

    Energy Technology Data Exchange (ETDEWEB)

    Penner, S S

    1983-08-01

    Present federal policy relies mainly on market forces for assuring adequate energy supplies. In addition to national oil stockpiles, the federal government has developed, but not yet tested, an early warning system for energy shortages, in cooperation with the Department of Defense. Primary responsibility for detailed contingency planning rests with the states. Transportation systems are undergoing general change and adaptation, which government should promote while managing its own transportation resources optimally. Government planning for emergencies of all varieties should be inter-agency directed, but constrained by full recognition of extensive remedial action taken at the local level. Industry emergency planning encompasses measures by the manufacturing sector, including optimal fuel economy for vehicles and the possible use of alternative fuels. Railroad contingency planning requires some federal and regional government regulatory reforms. The federal fuel allocation program was detrimental to all transportation modes. The appropriate degree of fuel price stabilization during shortages remains highly controversial, partly on the grounds that controls lower GNP. The prevalent view was that priority allocations at any level are worse than price allocations. Equity issues should be addressed at the local level and transfers carried out in the form of money. Field evaluations, combined with quantitative modeling of the issues raised here, would be highly desirable.

  12. [Scientific basis of environmental health contingency planning for a coastal oil spill].

    Science.gov (United States)

    Kim, Young Min; Cheong, Hae Kwan; Kim, Jong Ho; Kim, Jong Hun; Ko, Kumsook; Ha, Mina

    2009-03-01

    This study presents a scientific basis for the establishment of an environmental health contingency plan for dealing with accidental coastal oil spills and suggests some strategies for use in an environmental health emergency. We reviewed the existing literature, and analyzed the various fundamental factors involved in response strategies for oil spill. Our analysis included data derived from Hebei Spirit oil spill and used air dispersion modeling. Spill amounts of more than 1,000 kl can affect the health of residents along the coast, especially those who belong to vulnerable groups. Almost 30% of South Korean population lives in the vicinity of the coast. The area that is at the highest risk for a spill and that has the greatest number of people at risk is the stretch of coastline from Busan to Tongyeong. The most prevalent types of oil spilt in Korean waters have been crude oil and bunker-C oil, both of which have relatively high specific gravity and contain volatile organic compounds, polycyclic aromatic hydrocarbons, and metals. In the case of a spill of more than 1,000 kl, it may be necessary to evacuate vulnerable and sensitive groups. The government should establish environmental health planning that considers the spill amount, the types of oil, and the distance between the spot of the accident and the coast, and should assemble a response team that includes environmental health specialists to prepare for the future oil spill.

  13. Using contingent valuation to explore willingness to pay for renewable energy: A comparison of collective and voluntary payment vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan H.

    2002-07-28

    Some of the most basic questions about the organization and functioning of society involve issues raised by the existence of public goods. With respect to environmental public goods, how should funds used to support environmental improvement be collected and used? In particular, are collective, mandatory payments superior to voluntary, charitable payments due to the possibility of free riding? And to what degree should the government be involved in spending these funds: should the government directly fund environmental improvement projects or should the private sector be used to collect funds and determine funding priorities? This report explores these questions from the perspective of renewable energy: wind, geothermal, biomass, hydropower, and solar. In particular, this report analyzes the payment preferences of U.S. households through the implementation of a large-scale contingent valuation (CV) survey of willingness to pay (WTP) for renewable energy. Renewable energy can be supported through a mandatory ''tax'' on electric bills or through voluntary payments via green power marketing; the government may or may not be heavily involved in the collection and expenditure of such funds. The question of how households prefer to pay for renewable energy is therefore highly relevant. The primary objective of this study is to explore variations in stated WTP for renewable energy under the following four payment and provision contexts: (1) A mandatory increase in the electricity bills of all customers, the funds from which are collected and spent by the government on renewable energy projects. (2) A voluntary increase in the electricity bills of those customers who choose to pay, the funds from which are collected and spent by the government on renewable energy projects. (3) A voluntary increase in the electricity bills of those customers who choose to pay, the funds from which are collected and spent by electricity suppliers on renewable energy

  14. NANA Strategic Energy Plan & Energy Options Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Jay Hermanson; Brian Yanity

    2008-12-31

    NANA Strategic Energy Plan summary NRC, as an Alaska Native Corporation, has committed to addressing the energy needs for its shareholders. The project framework calls for implicit involvement of the IRA Councils in the Steering Committee. Tribal Members, from the NRC to individual communities, will be involved in development of the NANA Energy Plan. NRC, as the lead tribal entity, will serve as the project director of the proposed effort. The NRC team has communicated with various governmental and policy stakeholders via meetings and discussions, including Denali Commission, Alaska Energy Authority, and other governmental stakeholders. Work sessions have been initiated with the Alaska Village Electric Cooperative, the NW Arctic Borough, and Kotzebue Electric Association. The NRC Strategic Energy Plan (SEP) Steering committee met monthly through April and May and weekly starting in June 2008 in preparation of the energy summit that was held from July 29-31, 2008. During preparations for the energy summit and afterwards, there was follow through and development of project concepts for consideration. The NANA regional energy summit was held from July 29-31, 2008, and brought together people from all communities of the Northwest Arctic Borough. The effort was planned in conjunction with the Alaska Energy Authority’s state-wide energy planning efforts. Over $80,000 in cash contributions was collected from various donors to assist with travel from communities and to develop the summit project. Available funding resources have been identified and requirements reviewed, including the Denali Commission, U.S. Dept. of Agriculture, and the Alaska Energy Authority. A component of the overall plan will be a discussion of energy funding and financing. There are current project concepts submitted, or are ready for submittal, in the region for the following areas: • Wind-diesel in Deering, Buckland, Noorik, and Kiana areas; potential development around Red Dog mine.

  15. Hanford year 2000 Business Continuity Plan

    International Nuclear Information System (INIS)

    VORNEY, S.V.

    1999-01-01

    The goal of Department of Energy Richland Operations (DOE-RL) Year 2000 (Y2K) effort is to ensure that the Hanford site successfully continues its mission as we approach and enter the 21th century. The Y2K Business Continuity Planning process provides a structured approach to identify Y2K risks to the site and to mitigate these risks through Y2K Contingency Planning, ''Zero-Day'' Transition Planning and Emergency Preparedness. This document defines the responsibilities, processes and plans for Hanford's Y2K Business Continuity. It identifies proposed business continuity drills, tentative schedule and milestones

  16. Measuring the Social Value of Nuclear Energy using Contingent Valuation Methodology

    International Nuclear Information System (INIS)

    Jun, Eun Ju; Kim, Won Joon; Chang, Soon Heung

    2009-01-01

    In recent years, in addition to unstable energy supply and volatile energy prices, environmental concerns make energy security as the principal objective of energy policy in many nations. The International Energy Agency (2007) released what is probably its most pessimistic World Energy Outlook to date saying that oil and natural gas imports, coal use and greenhouse gas emissions are set to grow inexorably through 2030 - trends that threaten to undermine energy security and accelerate climate change, if countries do not change their energy use policies. In near term, nuclear is expected to be accepted as one of the promising alternatives which can achieve both energy security and prevention of climate change. However, nuclear energy has some vulnerable points in the view of social acceptance due to the history of its development and previous. Many countries which use nuclear power as one the major energy sources have been solving the problem of low social acceptance of nuclear energy by allocating enormous subsidy to local government. Korea decided to give 300 million dollar to the local government, Gyeongjoo, for constructing low level waste management facilities. Japan also paid 120 million dollar to Rokkasho-mura area for constructing nuclear waste repository. Sellarfield in England, Cabril in Spain also received subsidy every year from the related industries and their government. However these subsidies were provided without any appropriate estimation for the value of risk taking of nuclear energy. In addition, those subsidies are expected to increase and burden the central government for the further development and usage of nuclear. This study, therefore, aims to evaluate the value of nuclear energy in view of social acceptance in order to contribute to effective application for the future nuclear development and policy making. We estimate the Willingness-To-Pay of nuclear energy using Contingent Valuation Method (CVM). We find high social cost of nuclear

  17. 78 FR 71448 - Regional Reliability Standard BAL-002-WECC-2-Contingency Reserve

    Science.gov (United States)

    2013-11-29

    ...; Order No. 789] Regional Reliability Standard BAL-002-WECC-2--Contingency Reserve AGENCY: Federal Energy... (Contingency Reserve). The North American Electric Reliability Corporation (NERC) and Western Electricity... Region and is meant to specify the quantity and types of [[Page 71449

  18. Resources | Energy Plan

    Science.gov (United States)

    Skip to main content Navigate Up This page location is: Department for Energy Development and Independence Department for Energy Development and Independence Resources Pages EnergyPlan Sign In Ky.gov An Official Website of the Commonwealth of Kentucky Energy and Environment Cabinet Department for Energy

  19. Optimal integrated sizing and planning of hubs with midsize/large CHP units considering reliability of supply

    International Nuclear Information System (INIS)

    Moradi, Saeed; Ghaffarpour, Reza; Ranjbar, Ali Mohammad; Mozaffari, Babak

    2017-01-01

    Highlights: • New hub planning formulation is proposed to exploit assets of midsize/large CHPs. • Linearization approaches are proposed for two-variable nonlinear CHP fuel function. • Efficient operation of addressed CHPs & hub devices at contingencies are considered. • Reliability-embedded integrated planning & sizing is formulated as one single MILP. • Noticeable results for costs & reliability-embedded planning due to mid/large CHPs. - Abstract: Use of multi-carrier energy systems and the energy hub concept has recently been a widespread trend worldwide. However, most of the related researches specialize in CHP systems with constant electricity/heat ratios and linear operating characteristics. In this paper, integrated energy hub planning and sizing is developed for the energy systems with mid-scale and large-scale CHP units, by taking their wide operating range into consideration. The proposed formulation is aimed at taking the best use of the beneficial degrees of freedom associated with these units for decreasing total costs and increasing reliability. High-accuracy piecewise linearization techniques with approximation errors of about 1% are introduced for the nonlinear two-dimensional CHP input-output function, making it possible to successfully integrate the CHP sizing. Efficient operation of CHP and the hub at contingencies is extracted via a new formulation, which is developed to be incorporated to the planning and sizing problem. Optimal operation, planning, sizing and contingency operation of hub components are integrated and formulated as a single comprehensive MILP problem. Results on a case study with midsize CHPs reveal a 33% reduction in total costs, and it is demonstrated that the proposed formulation ceases the need for additional components/capacities for increasing reliability of supply.

  20. Guam Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.

    2013-07-01

    Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

  1. Japan's new basic energy plan

    International Nuclear Information System (INIS)

    Duffield, John S.; Woodall, Brian

    2011-01-01

    In June 2010, the Japanese cabinet adopted a new Basic Energy Plan (BEP). This was the third such plan that the government has approved since the passage of the Basic Act on Energy Policy in 2002, and it represents the most significant statement of Japanese energy policy in more than four years, since the publication of the New National Energy Strategy (NNES) in 2006. Perhaps more than its predecessors, moreover, the new plan establishes a number of ambitious targets as well as more detailed measures for achieving those targets. Among the targets are a doubling of Japan's 'energy independence ratio,' a doubling of the percentage of electricity generated by renewable sources and nuclear power, and a 30 percent reduction in energy-related CO 2 emissions, all by 2030. This paper explains the origins of the 2010 BEP and why it was adopted. It then describes the content of the plan and how it differs from the NNES. A third section analyzes the appropriateness of the new goals and targets contained in the BEP and their feasibility, finding that achievement of many of the targets was likely to be quite challenging even before the March 2011 earthquake, tsunami, and nuclear crisis. - Highlights: → Origins of Japan's new Basic Energy Plan. → Content of Japan's new Basic Energy Plan. → Feasibility of achieving the targets in Japan's new Basic Energy Plan. → Impact of 2011 earthquake and tsunami on Japanese energy policy.

  2. An analysis of contingencies for making casks available for use during the early years of federal waste management system operations

    International Nuclear Information System (INIS)

    Johnson, P.E.; Pope, R.B.; Wankerl, M.W.; Joy, D.S.; Shappert, L.B.; Danese, F.L.; Best, R.E.; Schmid, S.

    1992-01-01

    This paper reports on a study which has been performed to examine the contingencies that could be pursued by the Department of energy's (DOE's) Office of Civilian Radioactive Waste Management (OCRWM) for shipping spent fuel beginning in 1998. OCRWM's current plan is to initiate operations using early production units of Initiative I truck and rail/barge casks that are presently being designed. Contingencies to this plan were considered in case some unforeseen event occurs that precludes the Initiative I casks from entering into service early in 1998 in sufficient quantities (both numbers and types) to satisfy DOE's shipping needs. Specifically, the study addressed the potential availability of cask systems, selected several cask usage scenarios, determined the requirements for casks under these scenarios, generically assessed different strategies for acquiring casks or the use of casks, and generically assessed cask fabrication capabilities. Issues concerning both domestic and foreign resources were addressed with a focus on the first five years of Federal Waste Management System (FWMS) operation

  3. An analysis of contingencies for making casks available for use during the early years of Federal Waste Management System operations

    International Nuclear Information System (INIS)

    Johnson, P.E.; Joy, D.S.; Pope, R.B.; Shappert, L.B.; Wankerl, M.W.; Best, R.E.; Schmid, S.; Danese, F.L.

    1992-01-01

    A study has been performed to examine the contingencies that could be pursued by the Department of Energy's (DOE's) Office of Civilian Radioactive Waste Management (OCRWM) for shipping spent fuel beginning in 1998. OCRWM's current plan is to initiate operations using early production units of Initiative I truck and rail/barge casks that are presently being designed. Contingencies to this plan were considered in case some unforeseen event occurs that precludes the Initiative I casks from entering into service early in 1998 in sufficient quantities (both numbers and types) to satisfy DOE's shipping needs. Specifically, the study addressed the potential availability of cask systems, selected several cask usage scenarios, determined the requirements for casks under these scenarios, generically assessed different strategies for acquiring casks or the use of casks, and generically assessed cask fabrication capabilities. Issues concerning both domestic and foreign resources were addressed with a focus on the first five years of Federal Waste Management System (FWMS) operation

  4. 33 CFR 154.1030 - General response plan contents.

    Science.gov (United States)

    2010-07-01

    ... and health plan. (vi) List of acronyms and definitions. (vii) A geographic-specific appendix for each... the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) (40 CFR part 300) and the Area Contingency Plan(s) (ACP) covering the area in which the facility operates. Facility owners or...

  5. Towards a European Energy Technology Policy - The European Strategic Energy Technology Plan (Set-Plan)

    International Nuclear Information System (INIS)

    Mercier, A.; Petric, H.; Peteves, E.

    2008-01-01

    The transition to a low carbon economy will take decades and affect the entire economy. There is a timely opportunity for investment in energy infrastructure. However, decisions to invest in technologies that are fully aligned with policy and society priorities do not necessarily come naturally, although it will profoundly affect the level of sustainability of the European energy system for decades to come. Technology development needs to be accelerated and prioritized at the highest level of the European policy agenda. This is the essence of the European Strategic Energy Technology Plan (SET-Plan). The SET-Plan makes concrete proposals for action to establish an energy technology policy for Europe, with a new mind-set for planning and working together and to foster science for transforming energy technologies to achieve EU energy and climate change goals for 2020, and to contribute to the worldwide transition to a low carbon economy by 2050. This paper gives an overview of the SET-Plan initiative and highlights its latest developments. It emphasises the importance of information in support of decision-making for investing in the development of low carbon technologies and shows the first results of the technology mapping undertaken by the newly established Information System of the SET-Plan (SETIS).(author)

  6. Planning for renewable energy in Devon

    International Nuclear Information System (INIS)

    1993-04-01

    The aim of the Study was to examine the technical, planning and environmental factors, and the resource availability, which may affect the development of renewable energy schemes in Devon, with particular reference to West Devon. The study was undertaken to draw up a specimen planning policy framework for the development of renewable energy in Devon, looking at each major renewable energy source and at the relevant environmental and planning constraints; using this framework, to amplify the draft Structure Plan policy for renewable energy; to draw up draft guidance and specimen policies for a Local Plan covering renewable energy for a District Council, in this case, West Devon Borough; and to provide a pilot study for implementing the draft Planning Policy Guidance (PPG) on renewable energy. (author)

  7. Hanford year 2000 Business Continuity Plan

    Energy Technology Data Exchange (ETDEWEB)

    ROGGENKAMP, S.L.

    1999-11-01

    The goal of Department of Energy Richland Operations (DOE-RL) Year 2000 (Y2K) effort is to ensure that the Hanford site successfully continues its mission as we approach and enter the 21th century. The Y2K Business Continuity Planning process provides a structured approach to identify Y2K risks to the site and to mitigate these risks through Y2K Contingency Planning, ''Zero-Day'' Transition Planning and Emergency Preparedness. This document defines the responsibilities, processes and plans for Hanford's Y2K Business Continuity. It identifies proposed business continuity drills, tentative schedule and milestones.

  8. Distinct Motivational Effects of Contingent and Noncontingent Rewards.

    Science.gov (United States)

    Manohar, Sanjay G; Finzi, Rebecca Dawn; Drew, Daniel; Husain, Masud

    2017-07-01

    When rewards are available, people expend more energy, increasing their motivational vigor. In theory, incentives might drive behavior for two distinct reasons: First, they increase expected reward; second, they increase the difference in subjective value between successful and unsuccessful performance, which increases contingency-the degree to which action determines outcome. Previous studies of motivational vigor have never compared these directly. Here, we indexed motivational vigor by measuring the speed of eye movements toward a target after participants heard a cue indicating how outcomes would be determined. Eye movements were faster when the cue indicated that monetary rewards would be contingent on performance than when the cue indicated that rewards would be random. But even when the cue indicated that a reward was guaranteed regardless of speed, movement was still faster than when no reward was available. Motivation by contingent and certain rewards was uncorrelated across individuals, which suggests that there are two separable, independent components of motivation. Contingent motivation generated autonomic arousal, and unlike noncontingent motivation, was effective with penalties as well as rewards.

  9. Guam Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  10. Limerick Clare Energy Plan

    DEFF Research Database (Denmark)

    Connolly, David; Mathiesen, Brian Vad; Dubuisson, Xavier

    2012-01-01

    at a national level, but they need to be supplemented by local plans also, since the most successful renewable energy projects to date are at a local level. For example, it is evident from the transition to renewable energy in Denmark, that 100% renewable energy systems can already be implemented at a local...... level. Hence, by initiating local action, national targets can be met and exceeded, while also creating a template for a wider transition to renewable energy. Accordingly, the primary goal of the project is: To develop a local energy plan for Limerick and Clare which is based on a quantified assessment...

  11. Fuzzy-set based contingency ranking

    International Nuclear Information System (INIS)

    Hsu, Y.Y.; Kuo, H.C.

    1992-01-01

    In this paper, a new approach based on fuzzy set theory is developed for contingency ranking of Taiwan power system. To examine whether a power system can remain in a secure and reliable operating state under contingency conditions, those contingency cases that will result in loss-of-load, loss-of generation, or islanding are first identified. Then 1P-1Q iteration of fast decoupled load flow is preformed to estimate post-contingent quantities (line flows, bus voltages) for other contingency cases. Based on system operators' past experience, each post-contingent quantity is assigned a degree of severity according to the potential damage that could be imposed on the power system by the quantity, should the contingency occurs. An approach based on fuzzy set theory is developed to deal with the imprecision of linguistic terms

  12. Regional energy-environmental planning

    International Nuclear Information System (INIS)

    Colavecchio, Antonio

    2007-01-01

    In consideration of the relationship existing between energy and environment, it's clear that tools are needed to reach a pre-emptive convergence of different interests coming from the management of these sectors. The main tool to realize the above-mentioned convergence of interests in the Regional Energy and Environment Plan (PEAR). The plan allows italian Regions to schedule and to address energy measures in their own area and to regulate Local entities functions [it

  13. Learning, awareness, and instruction: subjective contingency awareness does matter in the colour-word contingency learning paradigm.

    Science.gov (United States)

    Schmidt, James R; De Houwer, Jan

    2012-12-01

    In three experiments, each of a set colour-unrelated distracting words was presented most often in a particular target print colour (e.g., "month" most often in red). In Experiment 1, half of the participants were told the word-colour contingencies in advance (instructed) and half were not (control). The instructed group showed a larger learning effect. This instruction effect was fully explained by increases in subjective awareness with instruction. In Experiment 2, contingency instructions were again given, but no contingencies were actually present. Although many participants claimed to be aware of these (non-existent) contingencies, they did not produce an instructed contingency effect. In Experiment 3, half of the participants were given contingency instructions that did not correspond to the correct contingencies. Participants with these false instructions learned the actual contingencies worse than controls. Collectively, our results suggest that conscious contingency knowledge might play a moderating role in the strength of implicit learning. Copyright © 2012 Elsevier Inc. All rights reserved.

  14. Energy and urban planning

    DEFF Research Database (Denmark)

    Fertner, Christian

    How can spatial planning reduce energy use in our cities? How do different geographical, regional, cultural or political contexts influence our options? How can we measure and monitor its effects? And where do we set the boundaries for the definition of action and goals? Findings from the interna......How can spatial planning reduce energy use in our cities? How do different geographical, regional, cultural or political contexts influence our options? How can we measure and monitor its effects? And where do we set the boundaries for the definition of action and goals? Findings from...... the international EU-FP7 project PLEEC (‘Planning for energy efficient cities’, 2013-2016) and spin-off projects list options and challenges....

  15. Interactive Energy Planning

    DEFF Research Database (Denmark)

    Blarke, Morten Boje

    2006-01-01

    Though it is being questioned whether planning theory should be fitted into neat typologies, some have described evolving planning theory as a journey away from ethnocentrism, through the lands of rationalism, pragmatism, socio-ecological idealism, political-economic mobilization, currently...... anchoring along the shores of the land of communications and collaboration. Whether or not a particular typology is applicable, theory and praxis are establishing standpoints, which strengthens our understanding of the planning complex, and which should inspire improved energy planning methodologies...

  16. 300 Area Process Trenches Supplemental Information to the Hanford Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    R.A. Carlson

    1997-01-01

    The 300 Area Process Trenches are surface impoundments which were used to receive routine discharges of nonregulated process cooling water from operations in the 300 Area and dangerous waste from several research and development laboratories and the 300 Area Fuels Fabrication process. Discharges to the trenches ceased in 1994, and they were physically isolated in 1995. Remediation of the trenches is scheduled to begin during July 1997. Currently, there are no waste management activities required at the 300 Area Process Trenches and the unit does not present any significant hazards to adjacent units, personnel, or the environment. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 300 Area Process Trenches, however, during remediation, exposure, spill, fire, and industrial hazards will exist. This contingency plan addresses the emergency organization, equipment and evacuation routes pertinent to the process trenches during remediation

  17. Contingency plans for the ISEE-3 libration-point mission

    Science.gov (United States)

    Dunham, D. W.

    1979-01-01

    During the planning stage of the International Sun-Earth Explorer-3 (ISEE-3) mission, a recovery strategy was developed in case the Delta rocket underperformed during the launch phase. If a large underburn had occurred, the ISEE-3 spacecraft would have been allowed to complete one revolution of its highly elliptical earth orbit. The recovery plan called for a maneuver near perigee to increase the energy of the off-nominal orbit; a relatively small second maneuver would then insert the spacecraft into a new transfer trajectory toward the desired halo orbit target, and a third maneuver would place the spacecraft in the halo orbit. Results of the study showed that a large range of underburns could be corrected for a total nominal velocity deviation cost within the ISEE-3 fuel budget.

  18. Counterfactual reasoning for regretted situations involving controllable versus uncontrollable events: the modulating role of contingent self-esteem.

    Science.gov (United States)

    Wilkinson, Meredith R; Ball, Linden J; Alford, David

    2015-01-01

    We report a study that examined the modulating impact of contingent self-esteem on regret intensity for regretted outcomes associated with controllable versus uncontrollable events. The Contingent Self-Esteem Scale (e.g., Kernis & Goldman, 2006) was used to assess the extent to which a person's sense of self-worth is based on self and others' expectations. We found that there was an influence of self-esteem contingency for controllable but not for uncontrollable regret types. For controllable regret types individuals with a high contingent (i.e., unstable) self-esteem reported greater regret intensity than those with a low contingent (i.e., stable) self-esteem. We interpret this finding as reflecting a functional and adaptive role of high contingent self-esteem in terms of mobilizing the application of counterfactual reasoning and planning mechanisms that can enable personal expectations to be achieved in the future.

  19. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    International Nuclear Information System (INIS)

    None, None

    2016-01-01

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

  20. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Bush, Shane [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2015. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.”

  1. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-09-13

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

  2. In-House Energy Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    DOE facilities are required to develop a documented energy management program encompassing owned and leased facilities and vehicles and equipment. The program includes an Energy Management Plan consistent with the requirements of the DOE ten-year In-House Energy Management Plan, an ECP specifying actions associated with the sudden disruption in the supply of critical fuels, an Energy Management Committee comprised of WIPP employees, and reporting criteria for quarterly energy consumption reporting to DOE Headquarters. The In-House Energy Management Program will include an implementation plan, a budget, and an interaction and coordination plan. The goal of this program is to sensitize the WIPP employees to the energy consequences of their actions and to motivate them to use energy more efficiently. To achieve this goal, the program is designed to both improve energy conservation at the WIPP through the direct efforts of every employee, and to encourage employees to take the lead in conserving energy at home, on the road, and in the community

  3. Contingency Contractor Optimization Phase 3 Sustainment Verification and Validation V&V) Report - Contingency Contractor Optimization Engineering - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Adair, Kristin Lynn [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Turgeon, Jennifer [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). High Confidence System Environments

    2016-04-01

    The reports and test plans contained within this document serve as supporting materials to the activities listed within the “Contingency Contractor Optimization Tool – Prototype (CCOT-P) Verification & Validation Plan” [1]. The activities included test development, testing, peer reviews, and expert reviews. The engineering prototype reviews were done for both the software and the mathematical model used in CCOT-P. Section 2 includes the peer and expert review reports, which summarize the findings from each of the reviews and document the resolution of any issues. Section 3 details the test plans that were followed for functional testing of the application through the interface. Section 4 describes the unit tests that were run on the code.

  4. Resilience and Renewable Energy Planning in Greenland

    DEFF Research Database (Denmark)

    Carruth, Susan

    2014-01-01

    Using a combination of thematic analysis and studio-based planning proposals in West Greenland, this paper proposes that there is more than one interpretation of resilience in renewable energy planning. All energy transitions, from one system to another, are protracted and unpredictable, and the ......Using a combination of thematic analysis and studio-based planning proposals in West Greenland, this paper proposes that there is more than one interpretation of resilience in renewable energy planning. All energy transitions, from one system to another, are protracted and unpredictable......, and the transition to a renewable energy system is proving no exception. Such a transition is particularly amplified in the context of Greenland – a country undergoing rapid transformation in many fields, including energy. Resilience theory offers an approach for how to plan for this energy transition, but how...... to translate resilience theory into planning practices remains underdeveloped. The paper begins by outlining some of the challenges in planning a transition to renewable energy, and sketching Greenland’s energy landscape. It then discusses the key characteristics of resilience thinking, before proposing...

  5. Counterfactual Reasoning for Regretted Situations Involving Controllable Versus Uncontrollable Events: The Modulating Role of Contingent Self-Esteem

    Science.gov (United States)

    Wilkinson, Meredith R.; Ball, Linden J.; Alford, David

    2015-01-01

    We report a study that examined the modulating impact of contingent self-esteem on regret intensity for regretted outcomes associated with controllable versus uncontrollable events. The Contingent Self-Esteem Scale (e.g., Kernis & Goldman, 2006) was used to assess the extent to which a person’s sense of self-worth is based on self and others’ expectations. We found that there was an influence of self-esteem contingency for controllable but not for uncontrollable regret types. For controllable regret types individuals with a high contingent (i.e., unstable) self-esteem reported greater regret intensity than those with a low contingent (i.e., stable) self-esteem. We interpret this finding as reflecting a functional and adaptive role of high contingent self-esteem in terms of mobilizing the application of counterfactual reasoning and planning mechanisms that can enable personal expectations to be achieved in the future. PMID:25883697

  6. Standard format and content of a licensee physical protection plan for strategic special nuclear material in transit - April 1980

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    A predetermined plan to respond to safeguards contingency events is required to be prepared, based on personnel and other physical protection resources described in the Physical Protection Plan for strategic special nuclear material (SSNM) in transit. Specific requirements for the contingency plan are provided in Appendix C. Licensee Safeguards Contingency Plans, to 10 CFR Part 73. Regulatory Guide 5.56, Standard Format and Content of Safeguards Contingency Plans for Transportation, provides guidance for the preparation of transportation contingency plans. Licensee is reminded that all three submissions - the Physical Protection Plan, the Physical Protection Arrangements for Specific Shipments, and the Safeguards Contingency Plan - together describe the system for physical protection of each particular shipment. They should be developed and maintained to be completely consistent with each other for each shipment

  7. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  8. Responsibility modelling for civil emergency planning

    OpenAIRE

    Sommerville, Ian; Storer, Timothy; Lock, Russell

    2009-01-01

    This paper presents a new approach to analysing and understanding civil emergency planning based on the notion of responsibility modelling combined with HAZOPS-style analysis of information requirements. Our goal is to represent complex contingency plans so that they can be more readily understood, so that inconsistencies can be highlighted and vulnerabilities discovered. In this paper, we outline the framework for contingency planning in the United Kingdom and introduce the notion of respons...

  9. The BC energy plan : a vision for clean energy leadership

    International Nuclear Information System (INIS)

    2007-02-01

    Global warming is a pertinent environmental issue. This report presented a vision and plan for clean energy leadership in British Columbia (BC). The intent of the plan is make the province energy self-sufficient while taking responsibility for the natural environment and climate. The BC energy plan set out targets as well as a strategy for reducing greenhouse gas emissions. The plan outlines the steps that industry, environmental agencies, communities and citizens must take to reach goals for conservation, energy efficiency and clean energy. This report provided highlights of the BC energy plan and discussed energy conservation and efficiency targets. It also discussed electricity security and public ownership of electricity in addition to strategies and policy options for reducing greenhouse gas emissions from electricity. The report presented several policy options for alternative energy including an innovative clean energy fund; generating electricity from mountain pine beatlewood to turn wood waste into energy; and transportation strategies. The report also discussed electricity options such as bioenergy; coal thermal power; geothermal; hydrogen and fuel cell technology; large hydroelectric dams; natural gas; small hydro; solar; tidal energy; and wind. Other topics that were addressed in the report included skills, training and labour; and, oil and gas policy actions. A summary of policy actions was also presented. tabs., figs

  10. The BC energy plan : a vision for clean energy leadership

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-02-15

    Global warming is a pertinent environmental issue. This report presented a vision and plan for clean energy leadership in British Columbia (BC). The intent of the plan is make the province energy self-sufficient while taking responsibility for the natural environment and climate. The BC energy plan set out targets as well as a strategy for reducing greenhouse gas emissions. The plan outlines the steps that industry, environmental agencies, communities and citizens must take to reach goals for conservation, energy efficiency and clean energy. This report provided highlights of the BC energy plan and discussed energy conservation and efficiency targets. It also discussed electricity security and public ownership of electricity in addition to strategies and policy options for reducing greenhouse gas emissions from electricity. The report presented several policy options for alternative energy including an innovative clean energy fund; generating electricity from mountain pine beatlewood to turn wood waste into energy; and transportation strategies. The report also discussed electricity options such as bioenergy; coal thermal power; geothermal; hydrogen and fuel cell technology; large hydroelectric dams; natural gas; small hydro; solar; tidal energy; and wind. Other topics that were addressed in the report included skills, training and labour; and, oil and gas policy actions. A summary of policy actions was also presented. tabs., figs.

  11. Thematic report on urban energy planning

    DEFF Research Database (Denmark)

    Meijers, Evert; Romein, Arie; Stead, Dominic

    The report reviews relations between urban structure (spatial structure + institutional structure) and four core themes of urban energy: • Urban planning and energy use in buildings (mainly residential buildings) • Industrial energy use and urban form • Spatial Planning, Urban Form and Transport...... Energy Consumption • Urban energy generation The reports ends with a summary of potential measure and policies of spatial planning in each of the four themes. However, we highlight also that it is crucial to consider the wider perspective and include considerations of potential rebound effects on direct...

  12. Future Contingents

    DEFF Research Database (Denmark)

    Øhrstrøm, Peter; Hasle., Per F. V.

    2015-01-01

    contingent statements. The problem of future contingents is interwoven with a number of issues in theology, philosophy, logic, semantics of natural language, computer science, and applied mathematics. The theological issue of how to reconcile the assumption of God's foreknowledge with the freedom and moral...... accountability of human beings has been a main impetus to the discussion and a major inspiration to the development of various logical models of time and future contingents. This theological issue is connected with the general philosophical question of determinism versus indeterminism. Within logic, the relation...... about the future. Finally, it should be mentioned that temporal logic has found a remarkable application in computer science and applied mathematics. In the late 1970s the first computer scientists realised the relevance of temporal logic for the purposes of computer science (see Hasle and Øhrstrøm 2004)....

  13. Future Contingents

    DEFF Research Database (Denmark)

    Øhrstrøm, Peter; Hasle., Per F. V.

    2011-01-01

    contingent statements. The problem of future contingents is interwoven with a number of issues in theology, philosophy, logic, semantics of natural language, computer science, and applied mathematics. The theological issue of how to reconcile the assumption of God's foreknowledge with the freedom and moral...... accountability of human beings has been a main impetus to the discussion and a major inspiration to the development of various logical models of time and future contingents. This theological issue is connected with the general philosophical question of determinism versus indeterminism. Within logic, the relation...... about the future. Finally, it should be mentioned that temporal logic has found a remarkable application in computer science and applied mathematics. In the late 1970s the first computer scientists realised the relevance of temporal logic for the purposes of computer science (see Hasle and Øhrstrøm 2004)....

  14. Wind Turbine Contingency Control Through Generator De-Rating

    Science.gov (United States)

    Frost, Susan; Goebel, Kai; Balas, Mark

    2013-01-01

    Maximizing turbine up-time and reducing maintenance costs are key technology drivers for wind turbine operators. Components within wind turbines are subject to considerable stresses due to unpredictable environmental conditions resulting from rapidly changing local dynamics. In that context, systems health management has the aim to assess the state-of-health of components within a wind turbine, to estimate remaining life, and to aid in autonomous decision-making to minimize damage to the turbine. Advanced contingency control is one way to enable autonomous decision-making by providing the mechanism to enable safe and efficient turbine operation. The work reported herein explores the integration of condition monitoring of wind turbines with contingency control to balance the trade-offs between maintaining system health and energy capture. The contingency control involves de-rating the generator operating point to achieve reduced loads on the wind turbine. Results are demonstrated using a high fidelity simulator of a utility-scale wind turbine.

  15. Urban structure, energy and planning

    DEFF Research Database (Denmark)

    Große, Juliane; Fertner, Christian; Groth, Niels Boje

    2016-01-01

    Transforming energy use in cities to address the threats of climate change and resource scarcity is a major challenge in urban development. This study takes stock of the state of energy in urban policy and planning and reveals potentials of and constraints to energy-efficient urban development....... The relationship between energy and urban structure provides a framework for discussing the role of urban planning to increase energy efficiency in cities by means of three in-depth case studies of medium-sized cities in Northern Europe: Eskilstuna in Sweden, Turku in Finland and Tartu in Estonia. In some ways...... these cities go ahead when it comes to their national climate and energy policies and aim to establish urban planning as an instrument to regulate and influence the city’s transition in a sustainable way. At the same time, the cities are constantly facing goal conflicts and limitations to their scope of action...

  16. Welfare and evacuation sub-plan: APTCARE - Lucas Heights

    International Nuclear Information System (INIS)

    1985-11-01

    This Sub-plan has been prepared as a contingency plan to the APTCARE document - A plan to cope with an accident at the Australian Atomic Energy Commission's Research Establishment at Lucas Heights. It details procedures to be followed for the evacuation and welfare of citizens residing in areas outside the Commission's establishment in the event that their health or safety is threatened by reason of an accident at the nuclear reactor facility which could have off-site implications. Additionally, it lists roles and tasking assignments of various counter-disaster response and support agencies in such an occurrence

  17. Towards sustainable energy planning and management

    DEFF Research Database (Denmark)

    Østergaard, Poul Alberg; Sperling, Karl

    2014-01-01

    Rising energy costs, anthropogenic climate change, and fossil fuel depletion calls for a concerted effort within energy planning to ensure a sustainable energy future. This article presents an overview of global energy trends focusing on energy costs, energy use and carbon dioxide emissions....... Secondly, a review of contemporary work is presented focusing on national energy pathways with cases from Ireland, Denmark and Jordan, spatial issues within sustainable energy planning and policy means to advance a sustainable energy future....

  18. ANALISIS SENSITIVITAS LINGKUNGAN OSCP (OIL SPILL CONTINGENCY PLAN DI PESISIR SELATAN DELTA MAHAKAM, PROVINSI KALIMANTAN TIMUR

    Directory of Open Access Journals (Sweden)

    Mursalin Mursalin

    2014-07-01

    Full Text Available The research was one part of oil spill contingency plan (OSCP developed for Delta Mahakam area, where oil & gas exploration and exploitation linked with rich biodiversity supporting coastal community livelihood. Environmental sensitivity  analysis for OSCP only do two early stages of OSCP scope, which integrated with the dangers of coastal vulnerability. This analysis mapped environmental component from oil pollution become sensitivity rangking as an effort to support response development strategies and priorities for the coastal resources protection. The aims of this research were (1 to establish environment sensitivity rank and (2 to identify primary factor supporting the environmental sensitivity for OSCP in south Delta Mahakam area. The result of analysis showed environmenal sensitivity was 62.37% (517.52 km, its mean very high sensitivity. Then the high sensitivity criteria was 11.31% (94 km. The criteria of medium sensitivity was 11.92% (99 km. While for low sensitivity and very low sensitivity respectively were 1.78% (15 km and 12.64% (105 km. Based on Principal Component Analysis (PCA, 36.01%  variability was explained by axis of factor 1. The others variability 18.53% and 13.93% were explained by axis of the factor 2 and factor 3. Axis of factor 1 for coastal exposure (EK, oil residence index (OR, coastal type (TP, and biological resources (SH had a quite large linear combinations coefficient, amounted to 0.94 (EK&OR, 0.83 (TP and 0.75 (SH. This indicated a very high contribution for environmental sensitivity OSCP level drafting. On axis of factor 2, the linear coeffisien combinations for the resource utilization of port (PL was 0.83 and settlement (PM was 0.85. Axis of factor 3 contributed 0.75 and 0.66 on migas platform (PO and placement of passive fishing gear/catchment area (AT. However, the utilization of coastal resources for PL, PM, PO and AT were on axis of factor 2 and factor 3 had a considerable distance with its SI variable

  19. Tethered Satellite System Contingency Investigation Board

    Science.gov (United States)

    1992-11-01

    The Tethered Satellite System (TSS-1) was launched aboard the Space Shuttle Atlantis (STS-46) on July 31, 1992. During the attempted on-orbit operations, the Tethered Satellite System failed to deploy successfully beyond 256 meters. The satellite was retrieved successfully and was returned on August 6, 1992. The National Aeronautics and Space Administration (NASA) Associate Administrator for Space Flight formed the Tethered Satellite System (TSS-1) Contingency Investigation Board on August 12, 1992. The TSS-1 Contingency Investigation Board was asked to review the anomalies which occurred, to determine the probable cause, and to recommend corrective measures to prevent recurrence. The board was supported by the TSS Systems Working group as identified in MSFC-TSS-11-90, 'Tethered Satellite System (TSS) Contingency Plan'. The board identified five anomalies for investigation: initial failure to retract the U2 umbilical; initial failure to flyaway; unplanned tether deployment stop at 179 meters; unplanned tether deployment stop at 256 meters; and failure to move tether in either direction at 224 meters. Initial observations of the returned flight hardware revealed evidence of mechanical interference by a bolt with the level wind mechanism travel as well as a helical shaped wrap of tether which indicated that the tether had been unwound from the reel beyond the travel by the level wind mechanism. Examination of the detailed mission events from flight data and mission logs related to the initial failure to flyaway and the failure to move in either direction at 224 meters, together with known preflight concerns regarding slack tether, focused the assessment of these anomalies on the upper tether control mechanism. After the second meeting, the board requested the working group to complete and validate a detailed integrated mission sequence to focus the fault tree analysis on a stuck U2 umbilical, level wind mechanical interference, and slack tether in upper tether

  20. Energy use and planning in France

    International Nuclear Information System (INIS)

    Nicolaon, G.A.

    1983-01-01

    Energy planning in France must compensate for a lack of natural resources and a 77% dependence on imports with conservation, an increased use of domestic sources, and diversified supplies. One problem is a high per-capita energy consumption that, although only half that of the US, has been a financial drain in recent years. Current plans to reduce oil consumption 25% by 1990 and energy dependence to less than 50% include conservation goals set for each sector. Nuclear energy is a cost-effective energy source that is compatible with France's energy goals and is the focus of much energy research. The emphasis on realistic goals and continuity are basic to France's continued success in energy planning. 4 figures, 10 tables

  1. Resilience and Renewable Energy Planning in Greenland

    DEFF Research Database (Denmark)

    Carruth, Susan

    2014-01-01

    Using a combination of thematic analysis and studio-based planning proposals in West Greenland, this paper proposes that there is more than one interpretation of resilience in renewable energy planning. All energy transitions, from one system to another, are protracted and unpredictable......, and the transition to a renewable energy system is proving no exception. Such a transition is particularly amplified in the context of Greenland – a country undergoing rapid transformation in many fields, including energy. Resilience theory offers an approach for how to plan for this energy transition, but how...... to translate resilience theory into planning practices remains underdeveloped. The paper begins by outlining some of the challenges in planning a transition to renewable energy, and sketching Greenland’s energy landscape. It then discusses the key characteristics of resilience thinking, before proposing...

  2. Summary report on urban energy planning

    DEFF Research Database (Denmark)

    Fertner, Christian; Große, Juliane; Groth, Niels Boje

    Based on the case study (Deliverables 4.2) as well as the thematic (Deliverable 4.3) work, a list of 29 spatial planning measures and policies was elaborated. The measures can increase energy efficiency, reduce energy use or increasing the share of renewable energy in a city. In the main part...... should take into consideration when working on their Energy Efficiency Action Plans: (1) How can spatial planning reduce energy use in our cities? (2) How do different geographical, regional, cultural or political contexts influence options? (3) How can we measure and monitor its effects? (4) What...

  3. Supervisory Styles: A Contingency Framework

    Science.gov (United States)

    Boehe, Dirk Michael

    2016-01-01

    While the contingent nature of doctoral supervision has been acknowledged, the literature on supervisory styles has yet to deliver a theory-based contingency framework. A contingency framework can assist supervisors and research students in identifying appropriate supervisory styles under varying circumstances. The conceptual study reported here…

  4. Energy planning and management plan

    International Nuclear Information System (INIS)

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  5. Planning competitiveness on the energy sector

    International Nuclear Information System (INIS)

    Hennicke, P.

    1991-01-01

    The book reviews the concept of least cost planning which can be applied in all stages of energy management. It is a system-analytical concept of planning, cost optimisation, and application of investment alternatives in energy supply and energy conversion. In particular, the authors discuss inhowfar the positive results achieved in the USA with cost saving programmes based on least-cost planning can be applied to the situation of the Federal Republic of Germany. It is shown that least-cost planning could make a key contribution to operations scheduling of public utilities, in the establishment and implementation of local and regional energy concepts, and especially in the theory and practice of state supervision of the energy sector. The 14 contributions can be found as separate records in this database. (orig./HP) With 31 figs [de

  6. Significant others and contingencies of self-worth: activation and consequences of relationship-specific contingencies of self-worth.

    Science.gov (United States)

    Horberg, E J; Chen, Serena

    2010-01-01

    Three studies tested the activation and consequences of contingencies of self-worth associated with specific significant others, that is, relationship-specific contingencies of self-worth. The results showed that activating the mental representation of a significant other with whom one strongly desires closeness led participants to stake their self-esteem in domains in which the significant other wanted them to excel. This was shown in terms of self-reported contingencies of self-worth (Study 1), in terms of self-worth after receiving feedback on a successful or unsatisfactory performance in a relationship-specific contingency domain (Study 2), and in terms of feelings of reduced self-worth after thinking about a failure in a relationship-specific contingency domain (Study 3). Across studies, a variety of contingency domains were examined. Furthermore, Study 3 showed that failing in an activated relationship-specific contingency domain had negative implications for current feelings of closeness and acceptance in the significant-other relationship. Overall, the findings suggest that people's contingencies of self-worth depend on the social situation and that performance in relationship-specific contingency domains can influence people's perceptions of their relationships.

  7. Rapid Automated Mission Planning System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed innovation is an automated UAS mission planning system that will rapidly identify emergency (contingency) landing sites, manage contingency routing, and...

  8. Energy future Santa Cruz: A citizens' plan for energy self-reliance

    Science.gov (United States)

    Cohn, J.; Stayton, R.

    The results of a grassroots energy conservation project which involved more than 3,100 residents of Santa Cruz, California, is discussed. Citizens attended forums and town meetings to suggest ideas for solving the community's energy problems. These ideas were then evaluated by the Energy Future Advisory Board and compiled into the Energy Future Plan. The energy plan covers such topics as new residences, residential retrofit, automobile efficiency, farm efficiency, commercial greenhouses, local food production, commercial efficiency, land use planning, energy education and financing, and solar, wind, and ocean energy. An energy implementation guide and glossary are included.

  9. Ontario's energy action plan

    International Nuclear Information System (INIS)

    2003-07-01

    In the fall of 2002, the government of Ontario announced an action plan designed to ensure stable electricity prices while additional electricity generating capacity is built. The action plan included a strategy for encouraging major private sector investments in wind, solar and other renewable energy sources. The strategies for new renewable energy projects include: property tax incentives, business income tax incentives, and sales tax rebates. Initiatives to increase supply include: Toronto's Portland 550 megawatt, natural gas-fired generating station, Niagara Falls' Beck Tunnel Project, and Windsor's 580 megawatt natural gas-fired generating station. The government is promoting energy conservation by reducing its electricity consumption by 10 per cent, and setting a target where 20 per cent of electricity consumed in the province must be from renewable energy sources. The use of interval meters by Ontario residents is being encouraged. A provincial sales tax rebate is being offered to customers buying select energy efficient appliances. In its commitment to environmental protection, the Ontario government is phasing out coal, offering rebates for solar energy systems, implementing measures to reduce acid rain, and investing $3.25 billion over ten years to renew and expand public transit. In Chatham, Ontario, a plant producing ethanol from corn was built, and others are planned for other parts of the province. Tax incentives are also offered for alternative fuel users. 1 ref., 1 tab

  10. Department of Energy Multiprogram Laboratories

    International Nuclear Information System (INIS)

    1982-09-01

    The Panel assessed DOE policies and procedures with respect to the laboratories as well as the effectiveness of the use DOE made of the laboratory capabilities in energy related areas. Recommendations are given for the appropriate roles and missions as opposed to the private sector; the scientific and technology transfer; organizational efficiencies; and contingency plans for coping with declining budgets

  11. Contingent Conspiracies: Art, Philosophy, Science

    DEFF Research Database (Denmark)

    Wilson, Alexander

    2013-01-01

    The question of whether creativity comes from being “open” or “closed” to contingent processes, deeply intersects art-historical discourse on authorship, style, technique and practice: from the Greek notion of the Daimon, through commedia dell'arte’s improvised styles and romanticism’s investment......, Hegel) contain a deeper tension between contingency and necessity, often revealed in correlate discussions of the sublime. But as artists find themselves returning again to a concern or care for contingency (a thread running through Heidegger, Levinas and Derrida) or the question how to conspire...... with contingency (Negarestani), they do so today with a new paradigm of scientific knowledge at their disposal. For science too has increasingly been forced to respond to the notion of contingency. Progressively discovering the ubiquity of non-linear dynamics, deterministic chaos and emergent complexity...

  12. Contingency diagrams as teaching tools

    OpenAIRE

    Mattaini, Mark A.

    1995-01-01

    Contingency diagrams are particularly effective teaching tools, because they provide a means for students to view the complexities of contingency networks present in natural and laboratory settings while displaying the elementary processes that constitute those networks. This paper sketches recent developments in this visualization technology and illustrates approaches for using contingency diagrams in teaching.

  13. 75 FR 54773 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Carbon Monoxide (CO...

    Science.gov (United States)

    2010-09-09

    .... Monitoring Network and Verification of Continued Attainment 4. Contingency Plan 5. Conformity Determination... maintenance plan to EPA on June 16, 2010. B. Limited Maintenance Plan The definition, general requirements... Continued Attainment, Contingency Plan, and Conformity Determinations Under Limited Maintenance Plans. These...

  14. 76 FR 45606 - Desert Renewable Energy Conservation Plan, Habitat Conservation Plan and Possible Land Use Plan...

    Science.gov (United States)

    2011-07-29

    ...-N131; 80221-1112-80221-F2] Desert Renewable Energy Conservation Plan, Habitat Conservation Plan and Possible Land Use Plan Amendment, Southern California: Environmental Impact Statement AGENCY: Fish and..., as amended, for the proposed Desert Renewable Energy Conservation Plan (DRECP). The EIS will be a...

  15. Contingency planning for electronic health record-based care continuity: a survey of recommended practices.

    Science.gov (United States)

    Sittig, Dean F; Gonzalez, Daniel; Singh, Hardeep

    2014-11-01

    Reliable health information technology (HIT) in general, and electronic health record systems (EHRs) in particular are essential to a high-performing healthcare system. When the availability of EHRs are disrupted, alternative methods must be used to maintain the continuity of healthcare. We developed a survey to assess institutional practices to handle situations when EHRs were unavailable for use (downtime preparedness). We used literature reviews and expert opinion to develop items that assessed the implementation of potentially useful practices. We administered the survey to U.S.-based healthcare institutions that were members of a professional organization that focused on collaboration and sharing of HIT-related best practices among its members. All members were large integrated health systems. We received responses from 50 of the 59 (84%) member institutions. Nearly all (96%) institutions reported at least one unplanned downtime (of any length) in the last 3 years and 70% had at least one unplanned downtime greater than 8h in the last 3 years. Three institutions reported that one or more patients were injured as a result of either a planned or unplanned downtime. The majority of institutions (70-85%) had implemented a portion of the useful practices we identified, but very few practices were followed by all organizations. Unexpected downtimes related to EHRs appear to be fairly common among institutions in our survey. Most institutions had only partially implemented comprehensive contingency plans to maintain safe and effective healthcare during unexpected EHRs downtimes. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  16. Action plan for renewable energy sources

    International Nuclear Information System (INIS)

    2000-03-01

    In the Finnish Energy Strategy, approved by the Finnish Government in 1997, the emphasis is laid on the importance of bioenergy and other renewable energy sources for the creation of such prerequisites for the Finnish energy economy that the supply of energy can be secured, the price on energy is competitive and the emissions from energy generation are within the limits set by the international commitments made by Finland. In 1998, the European Union Meeting of the Ministers of Energy adopted a resolution taking a positive attitude to the Communication from the Commission 'Energy for the future: Renewable sources of energy' - White Paper for a Community Strategy and Action Plan. National measures play a key role in the achievement of the objectives set in the White Paper. This Action Plan for Renewable Energy Sources is a national programme in line with the EU's White Paper. It comprises all renewable sources of energy available in Finland. It encompasses even peat, which in Finland has traditionally been considered to be a solid biofuel but is internationally classified as one of the non-renewable sources of energy. In the Action Plan, objectives are set for the volume of renewable energy sources used in the year 2010 including a prognosis on the development by the year 2025. The goal is that by the year 2010 the volume of energy generated using renewable energy sources has increased by 50% compared with the year 1995. This would mean an increase by 3 Mtoe, which is about 1 Mtoe more than anticipated in the outlook based on the Finnish Energy Strategy. A further goal is to double the use of renewable energy sources by the year 2025. The aggregate use of renewable energy sources depends to a large extent both on the development of the price on energy produced using other energy sources and on possible changes in the production volume of the Finnish forest industry. The most important objective stated in the Action Plan is to improve the competitiveness of renewable

  17. Energy efficiency action plan. Policy action plan for promotion of energy efficiency in the Czech Republic to 2010

    International Nuclear Information System (INIS)

    1999-08-01

    Energy efficiency and renewable energy production contribute to the three major goals of the national energy policy of the Czech Republic: overall competitiveness, security of supply and environmental protection. Therefore, the Czech government aims to promote these two sustainable options. The Energy Policy White Paper, which is being developed at the time of writing (June 1999), will provide the general framework for the future role of energy efficiency and renewable energy in the Czech Republic. In addition, it is necessary to develop specific policies. The National Energy Efficiency Study aimed to support the Czech government in the formulation of energy efficiency and renewable energy policy. The National Energy Efficiency Study has resulted in the following documents: (1) The Energy Efficiency Action Plan focuses on promotion of energy efficiency in end-use (this report); The Renewable Energy Action Plan (separate report; ECN-C--99-064) deals with policy on promotion of renewable energy production. These two Action Plans provide policy makers in the Czech government with essential information on potentials, targets, budgets and recommended policy instruments. The core of the Action Plans is the list of concrete policy actions, ready for implementation; and (2) The National Energy Efficiency Study NEES (separate report; ECN-C--99-063). This report is the background document to the two Action Plans. It contains detailed information on options and measures, potentials, barriers and policy instruments for energy efficiency and renewables. The main part is a detailed outline for a new energy efficiency and renewable policy. Also, it includes recommendations for financing schemes to overcome the investment constraints in the Czech Republic. Finally, a list of concrete projects is included to support project identification

  18. Renewable energy action plan. Policy action plan for promotion of renewable energy in the Czech Republic to 2010

    International Nuclear Information System (INIS)

    1999-08-01

    Energy efficiency and renewable energy production contribute to the three major goals of the national energy policy of the Czech Republic: overall competitiveness, security of supply; and environmental protection. Therefore, the Czech government promotes these two sustainable options. The Energy Policy White Paper, which is being developed at the time of writing (June 1999), will provide the general framework for the future role of energy efficiency and renewable energy in the Czech Republic. However, in addition, it is necessary to develop specific policies. The National Energy Efficiency Study aimed to support the Czech government in the formula tion of energy efficiency and renewable energy policy. The National Energy Efficiency Study has resulted in the following documents: (1) The Renewable Energy Action Plan (this report) addresses renewable energy production. The Energy Efficiency Action Plan focuses on the promotion of energy efficiency in end use (separate report; ECN-C--99-065). These two Action Plans provide policy makers in the Czech government with information on potentials, targets, budgets and recommended policy instruments. The core of the Action Plans is the list of concrete policy actions, ready for implementation; (2) The National Energy Efficiency Study NEES (separate report; ECN-C--99-063). This report is the background document to the two Action Plans. It contains detailed information on options and measures, potentials, barriers and policy instruments for energy efficiency and renewables. The main part is a detailed outline for a new energy efficiency and renewable policy. Also, it includes recommendations for financing schemes to overcome the invest ment constraints in the Czech Republic. Finally, a list of concrete projects is included to support project identification

  19. Planning for energy resource development

    Energy Technology Data Exchange (ETDEWEB)

    Magai, B S [Dept. of Mech. Eng., IIT Bombay, India

    1975-01-01

    A general review is provided of the national energy resources of India. They include wind power, tidal power, geothermal energy, and nuclear fission and fusion. Their present (1975) contribution to India's total energy requirements and the possibility of their accelerated development and impact on the national economy are discussed. Due to the serious proportions which the energy situation is assuming, it is suggested that a national energy council be set up within the Ministry of Energy to review all matters pertaining to energy, and to assume planning and evaluation responsibilities. It is also recommended that a Department of Energy Research, Development, and Demonstration be established as an autonomous agency which would carry out programs in utilization, conservation, environment, economics, and education. Present efforts by various ministries are fragmented and diverge in policy, leadership, and planning. It is believed that the proposed organizations would coordinate energy programs with national objectives.

  20. National energy planning with nuclear option

    International Nuclear Information System (INIS)

    Soetrisnanto, Arnold Y.; Hastowo, Hudi; Soentono, Soedyartomo

    2002-01-01

    National energy planning with nuclear option. Energy planning development is a part of the sustainable development that supports the attainment of national development goals. The objective of the study is to support the national planning and decision-making process in the energy and electric sector in Indonesia with nuclear option for period of 1998-2027. This study performs the provision of detailed economic sector and regional energy demand projection by MAED simulation model based on the economic and population scenarios. The optimization of the future energy supply such as electricity supply taking all known Indonesian energy sources and all relevant technologies into consideration by MARKAL Model. The results shows that Indonesia's need for final energy is forecasted to increase two times, from 4028,4 PJ at the beginning of study become 8145,6 PJ at the end of study. Performing the sensitivity study, it is predicted that nuclear energy could be introduced in the Java-Bali electricity grid about year 2016

  1. Energy planning in the Arab world

    Energy Technology Data Exchange (ETDEWEB)

    Elshafei, A.N.

    1979-09-01

    Efficient use of energy is of interest to the energy-surplus regions as well as the energy-deficit regions. Similarly, concern about energy conservation is not confined to the industrially developed regions of the world. This article discusses energy planning from the Arab point of view. A framework for Arab energy modeling is first described. Then the application of a computer model - that of Mesarovic and Pestel - to Arab energy-planning needs is discussed and some of the results are presented. Finally, current priorities in Arab energy-modeling studies are outlined. The Appendix surveys some existing models which address regional and international energy problems.

  2. Samish Indian Nation Long-Term Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Christine Woodward; B. Beckley; K. Hagen

    2005-06-30

    The Tribes strategic energy planning effort is divided into three phases: (1) Completing an Energy Resource Assessment; (2) Developing a Long-Term Strategic Energy Plan; and (3) Preparing a Strategic Energy Implementation Plan for the Samish Homelands. The Samish Indian Nation developed a comprehensive Strategic Energy plan to set policy for future development on tribal land that consists of a long-term, integrated, systems approach to providing a framework under which the Samish Community can use resources efficiently, create energy-efficient infrastructures, and protect and enhance quality of life. Development of the Strategic Energy plan will help the Samish Nation create a healthy community that will sustain current and future generations by addressing economic, environmental, and social issues while respecting the Samish Indian Nation culture and traditions.

  3. Contingencies of Value

    DEFF Research Database (Denmark)

    Strandvad, Sara Malou

    2014-01-01

    Based on a study of the admission test at a design school, this paper investigates the contingencies of aesthetic values as these become visible in assessment practices. Theoretically, the paper takes its starting point in Herrnstein Smith’s notion of ‘contingencies of values’ and outlines...... a pragmatist ground where cultural sociology and economic sociology meet. Informed by the literature on cultural intermediaries, the paper discusses the role of evaluators and the devices which accompany them. Whereas studies of cultural intermediaries traditionally apply a Bourdieusian perspective, recent......, the paper does not accept this storyline. As an alternative, the paper outlines the contingencies of values which are at play at the admission test, composed of official assessment criteria and scoring devices together with conventions within the world of design, and set in motion by interactions...

  4. 48 CFR 18.201 - Contingency operation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contingency operation. 18... METHODS AND CONTRACT TYPES EMERGENCY ACQUISITIONS Emergency Acquisition Flexibilities 18.201 Contingency operation. (a) Contingency operation is defined in 2.101. (b) Micro-purchase threshold. The threshold...

  5. Problems with Contingency Theory: Testing Assumptions Hidden within the Language of Contingency "Theory".

    Science.gov (United States)

    Schoonhoven, Clausia Bird

    1981-01-01

    Discusses problems in contingency theory, which relates organizational structure to the tasks performed and the information needed. Analysis of data from 17 hospitals suggests that traditional contingency theory underrepresents the complexity of relations among technological uncertainty, structure, and organizational effectiveness. (Author/RW)

  6. Optimal self-esteem is contingent: Intrinsic versus extrinsic and upward versus downward contingencies

    NARCIS (Netherlands)

    Vonk, R.; Smit, H.M.M.

    2012-01-01

    We argue that noncontingent, unconditional self-esteem is not optimal but defensive. We introduce the concept of intrinsic contingency, where self-esteem is affected by whether one's actions are self-congruent and conducive to personal growth. Whereas external contingencies, especially social and

  7. Energy planning in India

    International Nuclear Information System (INIS)

    Venu, S.

    1982-01-01

    A review is presented of India's planning for energy requirements in coal, oil, gas and nuclear power and in the fields of solar energy and the extension of forest areas to provide firewood. Coal and natural gas supplies will be increased to reduce oil demand. There will be an accelerated programme of development of bio-gas, an exploration of solar energy potential and extensive afforestation to provide additional energy sources. (author)

  8. 48 CFR 218.201 - Contingency operation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contingency operation. 218... Flexibilities 218.201 Contingency operation. (1) Selection, appointment, and termination of appointment... in a contingency contracting force. See 201.603-2(2). (2) Policy for unique item identification...

  9. Contingency interim measure for the public water supply at Barnes, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2009-07-09

    This document presents a conceptual design for a contingency interim measure (IM) for treatment of the public water supply system at Barnes, Kansas, should this become necessary. The aquifer that serves the public water supply system at Barnes has been affected by trace to low concentrations of carbon tetrachloride and its degradation product, chloroform. Investigations conducted on behalf of the CCC/USDA by Argonne National Laboratory (Argonne 2008a) have demonstrated that groundwater at the Barnes site is contaminated with carbon tetrachloride at concentrations exceeding the Kansas Tier 2 risk-based screening level (RBSL) and the EPA maximum contaminant level (MCL) of 5.0 {micro}g/L for this compound. The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) formerly operated a grain storage facility in Barnes, approximately 800 ft east-southeast of the public water supply wells. Carbon tetrachloride was used in the treatment of grain. Another potential source identified in an investigation conducted for the KDHE (PRC 1996) is the site of a former agriculture building owned by the local school district (USD 223). This building is located immediately east of well PWS3. The potential contingency IM options evaluated in this report include the treatment of groundwater at the public water supply wellheads and the provision of an alternate water supply via Washington County Rural Water District No.2 (RWD 2). This document was developed in accordance with KDHE Bureau of Environmental Remediation (BER) Policy No.BER-RS-029 (Revised) (KDHE 2006a), supplemented by guidance from the KDHE project manager. Upon the approval of this contingency IM conceptual design by the KDHE, the CCC/USDA will prepare a treatment system design document that will contain the following elements: (1) Description of the approved contingency IM treatment method; (2) Drawings and/or schematics provided by the contractor and/or manufacturer of the approved technology; (3) A

  10. The Necessity of Contingency or Contingent Necessity: Meillassoux, Hegel, and the Subject

    Directory of Open Access Journals (Sweden)

    John Van Houdt

    2011-06-01

    Full Text Available This article addresses the relationship of contingency to necessity as developed by Quentin Meillassoux and G.W.F. Hegel. Meillassoux criticizes the restriction of possibility by modern philosophy to the conditions of the transcendental subject, which he calls ‘correlationism’, and opposes to this correlationism, mathematics as an absolute form of thought. The arch-figure of a metaphysical version of correlationism for Meillassoux is Hegel. This article argues that, while Meillassoux is right to criticize a version of correlationism for restricting the range of contingency, he overlooks Hegel’s unique contribution to this issue. Hegel provides us a version of necessity modeled on the mathematical proof which answers Meillassoux’s concerns about correlationist versions of necessity but does not altogether jettison the concept of the subject. Instead, the subject in Hegel is a contingent interruption which emerges from the breaks in the kinds of necessity we posit about the world. Hegel offers us a way of tying these two concepts together in what I call ‘contingent necessity’.

  11. Contingency Operations of Americas Next Moon Rocket, Ares V

    Science.gov (United States)

    Jaap, John; Richardson, Lea

    2010-01-01

    and cause of a partially separated payload shroud. Other mitigations are really alternate missions; example, an engine out on during ascent resulted in insufficient propellant for the lunar mission, but the on-orbit vehicle stack is otherwise perfect and can pursue an alternate mission, such as a high ballistic trajectory to test the high-speed atmospheric reentry of Orion. Evaluation and presentation of contingency operations at this early stage of the development of the Ares V rocket will improve the design of the vehicle and lay the groundwork for the exhaustive contingency planning which must be done after the vehicle is built as preparations for operations.

  12. Centralisation and decentralisation in strategic municipal energy planning in Denmark

    International Nuclear Information System (INIS)

    Sperling, Karl; Hvelplund, Frede; Mathiesen, Brian Vad

    2011-01-01

    Denmark's future energy system is to be entirely based on renewable energy sources. Municipalities will play an important role as local energy planning authorities in terms of adopting and refining this vision in different local contexts. Based on a review of 11 municipal energy plans, this paper examines to what extent municipal energy planning matches national 100% renewable energy strategies. The results indicate a willingness among Danish municipalities to actively carry out energy planning, and the plans reveal a large diversity of (new) activities. At the same time, however, there is a strong need for better coordination of municipal energy planning activities at the central level. It is suggested that the role of municipalities as energy planning authorities needs to be outlined more clearly in, e.g., strategic energy planning which integrates savings, efficiency and renewable energy in all (energy) sectors. This requires the state to provide municipalities with the necessary planning instruments and establish a corresponding planning framework. Consequently, there is a need for a simultaneous centralisation and decentralisation during the implementation of the 100% renewable energy vision. The paper outlines a basic division of tasks between the central and the local level within such a strategic energy planning system. - Research highlights: → There is a large variety of energy-related activities in the 11 municipal energy and climate plans. → Only few plans contain all relevant sectors and activities in relation to a 100% RES. → Neglected areas are private transport, system regulation/integration and private buildings. → There is an acute need for coordination of municipal energy planning at the central level. → Strategic energy planning should integrate national policy with municipal energy planning.

  13. Visits to Australia by nuclear powered or armed vessels: contingency planning for the accidental release of ionizing radiation

    International Nuclear Information System (INIS)

    1989-01-01

    The report refers to the adequacy of current contingency planning by the Australian Federal and Senate authorities to deal with the accidental release of ionizating radiation from visiting nuclear powered or armed vessels in Australian waters and ports. Much of the material was obtained in response to questions put in writing by the Senate Standing Committee to the Department of Defence, ANSTO and others. In addition, the report contains relevant information from Commonwealth documents as well as the Committee findings and recommendations. Issues considered include: types of visiting nuclear powered vessels, accident likelihood and consequences, differences between naval and land-based reactors, safety records. The persons or organizations who made submissions or appeared in all public hearings are listed in the appendixes, along with all visits to Australian ports by nuclear powered warships from 1976 to 1988

  14. Some Tests for Evaluation of Contingency Tables (for Biomedical Applications)

    Czech Academy of Sciences Publication Activity Database

    Kalina, Jan

    2011-01-01

    Roč. 7, č. 1 (2011), s. 37-50 ISSN 1336-9180 R&D Projects: GA MŠk(CZ) 1M06014 Institutional research plan: CEZ:AV0Z10300504 Keywords : contingency tables * hypothesis testing Subject RIV: BB - Applied Statistics , Operational Research http://jamsi.fpv.ucm.sk/docs/v07n01_05_2011/v07_n01_03_KALINA.pdf

  15. 76 FR 17801 - Approval and Promulgation of Implementation Plans; New York Reasonable Further Progress Plans...

    Science.gov (United States)

    2011-03-31

    ..., Contingency Measures and Motor Vehicle Emissions Budgets AGENCY: Environmental Protection Agency (EPA). ACTION... plan, and the contingency measures as they relate to the New York portion of the New York- Northern New... individual listed in the FOR FURTHER INFORMATION CONTACT section to view the hard copy of the docket. You may...

  16. The “cost of not doing” energy planning: The Spanish energy bubble

    International Nuclear Information System (INIS)

    Gómez, Antonio; Dopazo, César; Fueyo, Norberto

    2016-01-01

    The Spanish power generation sector is facing dire problems: generation overcapacity, various tariff hikes over recent years, uncertainty over the financial viability of many power plants and a regulatory framework that lacks stability. This situation is the consequence of both poor energy policies and the economic crisis in the late 2000s and early 2010s. In this paper we analyze the following three points from an energy planning perspective: how the country has arrived at this situation; whether other alternatives would have been possible through adequate planning; and the quantitative benefits that would have been accrued from such planning. We do so by developing a LEAP model, and building three scenarios that allow to segregate the costs of the economic crisis from the costs of the lack of planning. We find that appropriate energy planning could have reduced investments in the Spanish power sector by 2010€28.6 billion without compromising on performance in terms of sustainability or energy security, while improving affordability. The main causes of these surplus investments were two supply bubbles: those of gas combined cycles and of solar technologies. The results of this work highlight the value of rigorous, quantitative energy planning, and the high costs of not doing it. - Highlights: • We analyze the costs of the lack of quantitative planning for energy-policy making. • We separate the costs of the economic crisis in Spain from the cost of not planning. • We find the “cost of not doing” energy planning to be 28.6 billion 2010EUR.

  17. American Samoa Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Haase, Scott [National Renewable Energy Lab. (NREL), Golden, CO (United States); Esterly, Sean [National Renewable Energy Lab. (NREL), Golden, CO (United States); Herdrich, David [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bodell, Tim [National Renewable Energy Lab. (NREL), Golden, CO (United States); Visser, Charles [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-08-01

    Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

  18. Energy future Santa Cruz. A citizens plan for energy self-reliance: Executive summary

    Science.gov (United States)

    Cohn, J.; Stayton, R.

    A grassroots energy conservation project which involved more than 3100 residents of Santa Cruz, California, is discussed. Citizens attended forums and town meetings to suggest ideas for solving the community's energy problems. These ideas were then evaluated by the Energy Future Advisory Board and compiled into the Energy Future Plan. The plan covers such topics as new residences, residential retrofit, automobile efficiency, farm efficiency, commercial greenhouses, local food production, commercial efficiency, land use planning, energy eduction and financing, and solar, wind, and ocean energy. If the plan is successfully implemented, the energy that the community is projected to use in 1991 can be lowered by 24 to 35 percent.

  19. Danish Experience in Local Energy Planning

    DEFF Research Database (Denmark)

    Lund, Henrik; Sørensen, Per Alex

    2003-01-01

    The paper describes the influence from public participation brings examples of local energy planning from Ærø and Samsø islands in Denmark.......The paper describes the influence from public participation brings examples of local energy planning from Ærø and Samsø islands in Denmark....

  20. A new wave-current online information system for oil spill contingency planning (WAVCIS)

    International Nuclear Information System (INIS)

    Stone, G.W.

    2001-01-01

    A Wave Current Information System (WAVCIS) for coastal Louisiana was presented. WAVCIS is an online oceanographic and meteorological observing system that provides many benefits to oil spill contingency planning. The system provides wave information such as wave height, period, direction of propagation, water level, surge, water column velocity profiles and meteorological conditions on a near real time basis. The information is gathered from several stations along Louisiana's coast in the Gulf of Mexico and is transmitted via cellular satellite telephone to a base station at Louisiana State University where it is then made available on the Internet. The database provides information regarding emergency response decision tools for agencies faced with decision making during storm threats or during coordination of an oil spill response operation. It also provides information needed for assisting operations support for offshore industries, commerce and trade. In addition, it can be used to obtain input boundary conditions for numerical modelling of surface and underwater oil and gas or mixtures of oil and gas. It was concluded that WAVCIS provides several benefits, including better cursory assessment of oil spill migration, precision numerical modeling of casts for oil spill trajectories, an important archived data set to assess trajectory modeling, and real-time environmental conditions for vessel operators using dispersants and in situ burning methods. 3 refs., 17 figs

  1. PYRAMID LAKE RENEWEABLE ENERGY PLAN

    Energy Technology Data Exchange (ETDEWEB)

    HIGH DESERT GEOCULTURE, LLC

    2009-06-06

    The Pyramid Lake Renewable Energy Plan covers these areas: energy potential (primarily focusing on geothermal resource potential, but also more generally addressing wind energy potential); renewable energy market potential; transmission system development; geothermal direct use potential; and business structures to accomplish the development objectives of the Pyramid Lake Paiute Tribe.

  2. ACCOUNTING FOR CONTINGENT CONSIDERATIONS IN BUSINESS COMBINATIONS

    Directory of Open Access Journals (Sweden)

    Gurgen KALASHYAN

    2017-07-01

    Full Text Available According to IFRS 3 Business Combinations contingent considerations must be included in the total consideration given for the acquired entity along with cash, other assets, ordinary or preference equity instruments, options, warrants. The contingent consideration is the determined amount which acquiring entity has to pay to acquired entity provided, that certain conditions will be fulfilled in the future. In case the provisions are not satisfied, we will get the situation when the amount of contingent consideration has been included in the total consideration given in the business combination, but in fact, the acquirer has not paid that amount. In its turn, the acquired entity will recognize the contingent consideration as a financial asset according to IFRS 9 Financial Instruments. In that case, it would be appropriately to recognize the contingent consideration as a contingent asset applying IAS 37. In the Article the author will explore the challenges of contingent consideration accounting and suggest the ways of solving the above mentioned problems.

  3. A Contingent Analysis of the Relationship between IS Implementation Strategies and IS Success.

    Science.gov (United States)

    Kim, Sang-Hoon; Lee, Jinjoo

    1991-01-01

    Considers approaches to dealing with user attitudes toward newly implemented information systems (IS), and suggests that behavioral management strategies relevant to IS fall into three categories: (1) empirical/rational; (2) normative/reeducative; and (3) power/coercive, based on "planned change" theories. An integrative contingent model…

  4. Contingency management: perspectives of Australian service providers.

    Science.gov (United States)

    Cameron, Jacqui; Ritter, Alison

    2007-03-01

    Given the very positive and extensive research evidence demonstrating efficacy and effectiveness of contingency management, it is important that Australia explore whether contingency management has a role to play in our own treatment context. Qualitative interviews were conducted with 30 experienced alcohol and drug practitioners, service managers and policy-makers in Victoria. Interviewees were selected to represent the range of drug treatment services types and included rural representation. A semi-structured interview schedule, covering their perceptions and practices of contingency management was used. All interviews were transcribed verbatim and analysed using N2 qualitative data analysis program. The majority of key informants were positively inclined toward contingency management, notwithstanding some concerns about the philosophical underpinnings. Concerns were raised in relation to the use of monetary rewards. Examples of the use of contingency management provided by key informants demonstrated an over-inclusive definition: all the examples did not adhere to the key principles of contingency management. This may create problems if a structured contingency management were to be introduced in Australia. Contingency management is an important adjunctive treatment intervention and its use in Australia has the potential to enhance treatment outcomes. No unmanageable barriers were identified in this study.

  5. Energy information. Status, cost, and need for energy, consumption and fuel switching data

    International Nuclear Information System (INIS)

    Fultz, Keith O.; Milans, Flora H.; Hale, Richard A.; Weaver, Joanne E.; D'Amico, Nicholas C.

    1989-04-01

    In 1986, EIA's Manufacturing Energy Consumption Survey collected calendar year 1985 fuel switching and energy consumption information from a sample of manufacturers. Although the construction, agriculture, mining, fishing, and forestry segments of the industrial sector were not surveyed, in 1985 the manufacturing segment accounted for about 75 to 80 percent of the total energy consumed in the industrial sector. The results of the energy consumption segment of the survey were published in November 1988, and the results of the fuel switching segment were published in December 1988. In 1989, EIA will conduct the second triennial survey, collecting energy consumption and fuel switching data for 1988. EIA estimated that the cost of the survey to the U.S. government, consisting of EIA and Census Bureau costs to design and conduct the survey, was about $1.8 million (in 1988 dollars) and that the cost to the manufacturers participating in the survey was more than $4 million (in 1988 dollars). According to EIA's justification to the Office of Management and Budget (OMB) for the survey, most of the potential users of the survey data were federal offices. Officials of seven of the eight federal offices we contacted indicated various uses for the energy consumption data, such as updating the national input-output tables and energy accounts, analyzing the competitiveness of U.S. industries, and doing energy emergency contingency planning. Officials of five of the eight federal offices indicated uses for the fuel switching data and most frequently cited its use for contingency planning for emergencies or supply disruptions. EIA's justification to OMB also identified 17 states as potential users, but officials of the 3 state offices that we contacted told us that the EIA data would not be useful because it cannot be summarized for individual states

  6. Effective energy planning for improving the enterprise’s energy performance

    Directory of Open Access Journals (Sweden)

    Păunescu Carmen

    2016-09-01

    Full Text Available The global pressing need to protect the environment, save energy and reduce greenhouse gas emissions worldwide has prompted the enterprises to implementing both individual energy saving measures and a more systematic approach to improve the overall enterprise’s energy performance. Energy management is becoming a priority as enterprises strive to reduce energy costs, conform to regulatory requirements, and improve their corporate image. As such, enterprises are encouraged to manage their energy related matters in a systematic manner and a more harmonized way, to ensure continual improvement on their energy efficiency. Despite the increasing interest in energy management standards, a gap persists between energy management literature and current implementation practices. The release of the ISO 50001 international standard was meant to help the organizations develop sound energy management systems and effective process-based energy management structures that could be recognized through third-party certification. Building on the energy management literature and energy management standards, the current paper presents the essential steps the enterprises should take to practically design a sustainable energy management system. Also, by using multiple case studies of enterprises that have implemented an ISO 50001 energy management system, it introduces a structured approach that companies can use to effectively develop their energy planning and improve energy performance. The key components of the enterprise’s energy planning are discussed, as well as practical examples of energy objectives and performance indicators from various industries are offered. The paper shows that by establishing an effective energy planning system, this will efficiently meet demands for achieving energy performance indicators and international certification.

  7. Alternative Forms of Fit in Contingency Theory.

    Science.gov (United States)

    Drazin, Robert; Van de Ven, Andrew H.

    1985-01-01

    This paper examines the selection, interaction, and systems approaches to fit in structural contingency theory. The concepts of fit evaluated may be applied not only to structural contingency theory but to contingency theories in general. (MD)

  8. Quinault Indian Nation Renewable Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Don Hopps, Institute for Washington' s Future; Jesse Nelson, Institute for Washington' s Future

    2006-11-28

    The Quinault Indian Nation (Nation) initiated this study on conservation and production of renewable energy because this approach created the opportunity: • To become self-sufficient and gain greater control over the energy the Nation uses; • To generate jobs and businesses for its members; • To better manage, sustain, and protect its resources; • To express the cultural values of the Nation in an important new arena. The Nation has relatively small energy needs. These needs are concentrated at two separate points: the Quinault Beach Resort and Casino (QBRC) and Taholah on the Quinault Indian Reservation (QIR). Except for the town of Queets, energy needs are small and scattered. The needs vary greatly over the season. The small scale, widely dispersed, and variable nature of these needs presents a unique challenge to the Nation. Meeting these needs requires a resource and technology that is flexible, effective, and portable. Conservation is the most cost-effective way to meet any need. It is especially effective in a situation like this where production would leave a high per unit cost. This plan is based on first gaining energy savings through conservation. Major savings are possible through: 1. Upgrading home appliances on the QIR. 2. Weatherizing homes and facilities. 3. Changes in lighting/ventilation in the QBRC pool room. These elements of the plan are already being implemented and promise to save the Nation around a quarter of its present costs. Wood biomass is the best resource available to the QIN for energy production either on-site or for commercial development. It is abundant, flexible and portable. Its harvesting has high job potential and these jobs are a good fit for the present “skill set” of the QIN. This plan focuses on using wood biomass to produce energy and other value-added products. Our study considered various technologies and approaches to using wood for energy. We considered production for both on-site and commercial production

  9. Thevenin Equivalent Method for Dynamic Contingency Assessment

    DEFF Research Database (Denmark)

    Møller, Jakob Glarbo; Jóhannsson, Hjörtur; Østergaard, Jacob

    2015-01-01

    A method that exploits Thevenin equivalent representation for obtaining post-contingency steady-state nodal voltages is integrated with a method of detecting post-contingency aperiodic small-signal instability. The task of integrating stability assessment with contingency assessment is challenged...... by the cases of unstable post-contingency conditions. For unstable postcontingency conditions there exists no credible steady-state which can be used for basis of a stability assessment. This paper demonstrates how Thevenin Equivalent methods can be applied in algebraic representation of such bifurcation...... points which may be used in assessment of post-contingency aperiodic small-signal stability. The assessment method is introduced with a numeric example....

  10. 15 CFR 923.13 - Energy facility planning process.

    Science.gov (United States)

    2010-01-01

    ... facility planning process. The management program must contain a planning process for energy facilities... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... affected public and private parties will be involved in the planning process. [61 FR 33806, June 28, 1996...

  11. Resource Estimations in Contingency Planning for Foot-and-Mouth Disease

    Directory of Open Access Journals (Sweden)

    Anette Boklund

    2017-05-01

    Full Text Available Preparedness planning for a veterinary crisis is important to be fast and effective in the eradication of disease. For countries with a large export of animals and animal products, each extra day in an epidemic will cost millions of Euros due to the closure of export markets. This is important for the Danish husbandry industry, especially the swine industry, which had an export of €4.4 billion in 2012. The purposes of this project were to (1 develop an iterative tool with the aim of estimating the resources needed during an outbreak of foot-and-mouth disease (FMD in Denmark, (2 identify areas, which can delay the control of the disease. The tool developed should easily be updated, when knowledge is gained from other veterinary crises or during an outbreak of FMD. The stochastic simulation model DTU-DADS was used to simulate spread of FMD in Denmark. For each task occurring during an epidemic of FMD, the time and personnel needed per herd was estimated by a working group with expertise in contingency and crisis management. By combining this information, an iterative model was created to calculate the needed personnel on a daily basis during the epidemic. The needed personnel was predicted to peak within the first week with a requirement of approximately 123 (65–175 veterinarians, 33 (23–64 technicians, and 36 (26–49 administrative staff on day 2, while the personnel needed in the Danish Emergency Management Agency (responsible for the hygiene barrier and initial cleaning and disinfection of the farm was predicted to be 174 (58–464, mostly recruits. The time needed for surveillance visits was predicted to be the most influential factor in the calculations. Based on results from a stochastic simulation model, it was possible to create an iterative model to estimate the requirements for personnel during an FMD outbreak in Denmark. The model can easily be adjusted, when new information on resources appears from management of other crisis or

  12. Decentralized energy planning and consensus in energy policy

    Energy Technology Data Exchange (ETDEWEB)

    Wilbanks, T. J.

    1980-05-02

    This paper explores the following three propositions and their relationships: (1) that, in our pluralistic policymaking environment, we cannot solve our nation's energy problems unless we can reach agreement among a diverse group of interested parties about specific actions; (2) that, short of a manifest emergency, such a consensus is difficult to reach unless the scale of the decision-making unit is relatively small; and therefore (3) that one of the keys to an effective energy policy in the United states is to rely heavily on local and regional energy planning and decision-making. First, the paper reviews our problem of irresolution and its roots, and it summaries the policy options for resolving it. Then it explores one of those options, decentralized planning, in a little more detail. Finally, it offers some speculations about the viability of a decentralized approach to energy planninng.

  13. Centralisation and decentralisation in strategic municipal energy planning in Denmark

    DEFF Research Database (Denmark)

    Sperling, Karl; Hvelplund, Frede; Mathiesen, Brian Vad

    2011-01-01

    need for better coordination of municipal energy planning activities at the central level. It is suggested that the role of municipalities as energy planning authorities needs to be outlined more clearly in, e.g., strategic energy planning which integrates savings, efficiency and renewable energy...... vision. The paper outlines a basic division of tasks between the central and the local level within such a strategic energy planning system.......Denmark’s future energy system is to be entirely based on renewable energy sources. Municipalities will play an important role as local energy planning authorities in terms of adopting and refining this vision in different local contexts. Based on a review of 11 municipal energy plans, this paper...

  14. Energy Efficiency Resources to Support State Energy Planning

    Energy Technology Data Exchange (ETDEWEB)

    Office of Strategic Programs, Strategic Priorities and Impact Analysis Team

    2017-06-01

    An early step for most energy efficiency planning is to identify and quantify energy savings opportunities, and then to understand how to access this potential. The U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy offers resources that can help with both of these steps. This fact sheet presents those resources. The resources are also available on the DOE State and Local Solution Center on the "Energy Efficiency: Savings Opportunities and Benefits" page: https://energy.gov/eere/slsc/energy-efficiency-savings-opportunities-and-benefits.

  15. Community energy planning in Canada. The role of renewable energy

    International Nuclear Information System (INIS)

    St Denis, Genevieve; Parker, Paul

    2009-01-01

    An emerging trend in Canada is the creation of community energy plans, where decisions that used to be left to regional level energy agencies or private individuals are now being considered at the community level. A desire to reduce greenhouse gas emissions and to become more energy self-sufficient is driving this change. Theoretically, local level management is desirable because it achieves these goals through improvements in the three areas of energy efficiency, energy conservation and switching to renewable energy sources. The analysis of 10 of the first community energy plans in Canadian communities, ranging in population size from 500 to one million, finds that communities are choosing policies and programs centred on increasing energy efficiency and conservation while renewable energy receives much less attention. Municipal operations were called upon to set higher targets than the general community. Communities that recognized the substantial potential of renewable energy often focused on technologies that the municipal sector could implement, such as bio-fuels for their transportation fleet. Wind, passive solar design, solar photovoltaics and solar thermal options were only recommended in a few cases. Overall, only one of the five larger communities (Calgary) recommended implementing multiple renewable energy technologies while three of the five smaller communities proposed multiple renewable energy sources. The implication is that smaller and more remote communities may be the most willing to lead in the planned introduction of renewable energy systems. (author)

  16. 30 CFR 218.152 - Fishermen's Contingency Fund.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Fishermen's Contingency Fund. 218.152 Section 218.152 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR MINERALS REVENUE..., Offshore § 218.152 Fishermen's Contingency Fund. Upon the establishment of the Fishermen's Contingency Fund...

  17. Equilibria of perceptrons for simple contingency problems.

    Science.gov (United States)

    Dawson, Michael R W; Dupuis, Brian

    2012-08-01

    The contingency between cues and outcomes is fundamentally important to theories of causal reasoning and to theories of associative learning. Researchers have computed the equilibria of Rescorla-Wagner models for a variety of contingency problems, and have used these equilibria to identify situations in which the Rescorla-Wagner model is consistent, or inconsistent, with normative models of contingency. Mathematical analyses that directly compare artificial neural networks to contingency theory have not been performed, because of the assumed equivalence between the Rescorla-Wagner learning rule and the delta rule training of artificial neural networks. However, recent results indicate that this equivalence is not as straightforward as typically assumed, suggesting a strong need for mathematical accounts of how networks deal with contingency problems. One such analysis is presented here, where it is proven that the structure of the equilibrium for a simple network trained on a basic contingency problem is quite different from the structure of the equilibrium for a Rescorla-Wagner model faced with the same problem. However, these structural differences lead to functionally equivalent behavior. The implications of this result for the relationships between associative learning, contingency theory, and connectionism are discussed.

  18. An Asset-Based Approach to Tribal Community Energy Planning

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez, Rachael A. [Pratt Inst., Brooklyn, NY (United States). City and Regional Planning; Martino, Anthony [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Materials, Devices, and Energy Technologies; Begay, Sandra K. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Materials, Devices, and Energy Technologies

    2016-08-01

    Community energy planning is a vital component of successful energy resource development and project implementation. Planning can help tribes develop a shared vision and strategies to accomplish their energy goals. This paper explores the benefits of an asset-based approach to tribal community energy planning. While a framework for community energy planning and federal funding already exists, some areas of difficulty in the planning cycle have been identified. This paper focuses on developing a planning framework that offsets those challenges. The asset-based framework described here takes inventory of a tribe’s capital assets, such as: land capital, human capital, financial capital, and political capital. Such an analysis evaluates how being rich in a specific type of capital can offer a tribe unique advantages in implementing their energy vision. Finally, a tribal case study demonstrates the practical application of an asset-based framework.

  19. 50 CFR 296.3 - Fishermen's contingency fund.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Fishermen's contingency fund. 296.3... ADMINISTRATION, DEPARTMENT OF COMMERCE CONTINENTAL SHELF FISHERMEN'S CONTINGENCY FUND § 296.3 Fishermen's contingency fund. (a) General. There is established in the Treasury of the United States the Fishermen's...

  20. Issues - I. Renewable energies and urban planning law - Urban planning law and renewable energies: I love you, neither I

    International Nuclear Information System (INIS)

    Gregory Kalfleche

    2012-01-01

    After having noticed that fossil energies must still be used beside renewable energies, and that renewable energies have some negative impacts on landscape and on the environment, the author highlights the fact that the French urban planning law gives a strong support to small renewable energy production units. In a second part, he shows that despite a commitment for the development of renewable energies, urban planning law mostly remains a constraint as far as the development of large units is concerned

  1. Resilience and Renewable Energy Planning in Greenland

    DEFF Research Database (Denmark)

    Carruth, Susan

    2014-01-01

    to translate resilience theory into planning practices remains underdeveloped. The paper begins by outlining some of the challenges in planning a transition to renewable energy, and sketching Greenland’s energy landscape. It then discusses the key characteristics of resilience thinking, before proposing...

  2. Motor contingency learning and infants with Spina Bifida.

    Science.gov (United States)

    Taylor, Heather B; Barnes, Marcia A; Landry, Susan H; Swank, Paul; Fletcher, Jack M; Huang, Furong

    2013-02-01

    Infants with Spina Bifida (SB) were compared to typically developing infants (TD) using a conjugate reinforcement paradigm at 6 months-of-age (n = 98) to evaluate learning, and retention of a sensory-motor contingency. Analyses evaluated infant arm-waving rates at baseline (wrist not tethered to mobile), during acquisition of the sensory-motor contingency (wrist tethered), and immediately after the acquisition phase and then after a delay (wrist not tethered), controlling for arm reaching ability, gestational age, and socioeconomic status. Although both groups responded to the contingency with increased arm-waving from baseline to acquisition, 15% to 29% fewer infants with SB than TD were found to learn the contingency depending on the criterion used to determine contingency learning. In addition, infants with SB who had learned the contingency had more difficulty retaining the contingency over time when sensory feedback was absent. The findings suggest that infants with SB do not learn motor contingencies as easily or at the same rate as TD infants, and are more likely to decrease motor responses when sensory feedback is absent. Results are discussed with reference to research on contingency learning in infants with and without neurodevelopmental disorders, and with reference to motor learning in school-age children with SB.

  3. Energy conservation: its planning and management

    International Nuclear Information System (INIS)

    Nanda, K.S.; Patra, K.C.

    1995-01-01

    Energy conservation, its planning and management and the development of renewable energy systems of proven design are very worthy challenges for all. Energy education at various levels is most important particularly in the development of renewable energy technology. 2 refs., 3 tabs

  4. TRUE multi-annual energy planning

    International Nuclear Information System (INIS)

    Bringault, Anne; Cormier, Cyrille; Arditi, Maryse

    2016-01-01

    A multi-annual energy planning (PPE) has been introduced by the French government to transcribe the objectives of the law on energy transition into evolutions for energy consumption and production for different periods (2016-2018 and 2019-2023). This publication first indicates various assessments for these periods regarding energy consumption, electricity consumption, fossil energy consumption, renewable energy production, the share of electric renewable energies, and the decrease of the nuclear share. These objectives are then discussed with respect to different scenarios, and notably a reference scenario

  5. Final Report for the Soboba Strategic Tribal Energy Planning Project

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Kim [EPA Specialist

    2013-09-17

    In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation. The Soboba Strategic Tribal Energy Plan's goal is to create a Five Year Energy Plan for the Soboba Band of Luiseno Indians in San Jacinto, California. This plan will guide the decision making process towards consistent progress leading to the Tribal goal of a 25% reduction in energy consumption in the next five years. It will additionally outline energy usage/patterns and will edentify areas the Tribe can decrease energy use and increase efficiency. The report documents activities undertaken under the grant, as well as incldues the Tribe's strategif energy plan.

  6. A contingency safe, responsible, economic, increased capacity spent nuclear fuel (SNF) advance fuel cycle

    International Nuclear Information System (INIS)

    Levy, S.

    2008-01-01

    The purpose of this paper is to have an Advanced Light Water (LWR) fuel cycle and an associated development program to provide a contingency plan to the current DOE effort to license once-through spent Light Water Reactor (LWR) fuel for disposition at Yucca Mountain (YM). The intent is to fully support the forthcoming June 2008 DOE submittal to the Nuclear Regulatory Commission (NRC) based upon the latest DOE draft DOE/EIS-0250F-SID dated October 2007 which shows that the latest DOE YM doses would readily satisfy the anticipated NRC and Environmental Protection Agency (EP) standards. The proposed Advance Fuel Cycle can offer potential resolution of obstacles that might arise during the NRC review and, particularly, during the final hearings process to be held in Nevada. Another reason for the proposed concept is that a substantial capacity growth of the YM repository will be necessary to accommodate the SNF of Advance Light Water Reactors (ALWRs) currently under consideration for United States (U.S.) electricity production (1) and the results of the recently issued study by the Electric Power Research Institute (EPRI) to reduce CO 2 emissions (2). That study predicts that by 2030 U.S. nuclear power generation would grow by 64 Gigawatt electrical (GWe) and account for 25.5 percent of the overall U.S. electrical generation. The current annual SNF once-through fuel cycle accumulation would rise from 2000-2100 MT (Metric Tons) to about 3480 MT in 2030 and the total SNF inventory, would reach nearly 500,000 MT by 2100 if U. S. nuclear power continues to grow at 1.1 percent per year after 2030. That last projection does not account for any SNF reduction due to increased fuel burnup or any increased capacity needed 'to establish supply Global Nuclear Energy Partnership (GNEP,) arrangements among nations to provide nuclear fuel and taking back spent fuel for recycling without spreading enrichment and reprocessing technologies' (3). The anticipated capacity of 120 MT

  7. Final Report - Development of a Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Maracas, Kate; Hooks, Todd

    2006-11-30

    The Agua Caliente Band of Cahuilla Indians was awarded a grant under the U.S. Department of Energy’s (“DOE”) Tribal Energy Program to develop a comprehensive Tribal energy plan. The grant, awarded under DOE’s First Steps program, supported the development of a strategic energy plan that integrates with the Tribe’s overall planning and economic development goals, and aligns with Tribal cultural, social, political, and spiritual values. The Tribe set out to incorporate its energy plan into (i) a broader economic development strategy developed by investigators at the University of California at Riverside, and (ii) the overarching goals for job-creation and wealth-creation that are held by both the Tribe and the surrounding Coachella Valley. With these wide-ranging objectives in mind, the Tribe and its consultant, Red Mountain Energy Partners, engaged in a phased approach to creating the strategic energy plan. As illustrated in Figure 1 below, the proposed approach involved both “serial” and “parallel” activities. The capacity-building component of this approach occurred throughout the duration of the project period.

  8. Searching for Plausible N-k Contingencies Endangering Voltage Stability

    DEFF Research Database (Denmark)

    Weckesser, Johannes Tilman Gabriel; Van Cutsem, Thierry

    2017-01-01

    This paper presents a novel search algorithm using time-domain simulations to identify plausible N − k contingencies endangering voltage stability. Starting from an initial list of disturbances, progressively more severe contingencies are investigated. After simulation of a N − k contingency......, the simulation results are assessed. If the system response is unstable, a plausible harmful contingency sequence has been found. Otherwise, components affected by the contingencies are considered as candidate next event leading to N − (k + 1) contingencies. This implicitly takes into account hidden failures...

  9. Psychophysics of associative learning: Quantitative properties of subjective contingency.

    Science.gov (United States)

    Maia, Susana; Lefèvre, Françoise; Jozefowiez, Jérémie

    2018-01-01

    Allan and collaborators (Allan, Hannah, Crump, & Siegel, 2008; Allan, Siegel, & Tangen, 2005; Siegel, Allan, Hannah, & Crump, 2009) recently proposed to apply signal detection theory to the analysis of contingency judgment tasks. When exposed to a flow of stimuli, participants are asked to judge whether there is a contingent relation between a cue and an outcome, that is, whether the subjective cue-outcome contingency exceeds a decision threshold. In this context, we tested the following hypotheses regarding the relation between objective and subjective cue-outcome contingency: (a) The underlying distributions of subjective cue-outcome contingency are Gaussian; (b) The mean distribution of subjective contingency is a linear function of objective cue-outcome contingency; and (c) The variance in the distribution of subjective contingency is constant. The hypotheses were tested by combining a streamed-trial contingency assessment task with a confidence rating procedure. Participants were exposed to rapid flows of stimuli at the end of which they had to judge whether an outcome was more (Experiment 1) or less (Experiment 2) likely to appear following a cue and how sure they were of their judgment. We found that although Hypothesis A seems reasonable, Hypotheses B and C were not. Regarding Hypothesis B, participants were more sensitive to positive than to negative contingencies. Regarding Hypothesis C, the perceived cue-outcome contingency became more variable when the contingency became more positive or negative, but only to a slight extent. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  10. Contingency plan for the Old Hydrofracture Facility Tanks Sluicing Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-06-01

    This revised contingency plan addresses potential scenarios involving the release of radioactively contaminated waste from the Old Hydrofracture Facility Tanks Contents Removal project to the environment. The tanks are located at the Oak Ridge National Laboratory. The project involves sluicing the contents of the five underground tanks to mix the sludge and supernatant layers, and pumping the mixture to the Melton Valley Storage Tanks (MVST) for future processing. The sluicing system to be used for the project consists of a spray nozzle designated the open-quotes Borehole Miner,close quotes with an associated pump; in-tank submersible pumps to transfer tank contents from the sluice tanks to the recycle tank; high-pressure pumps providing slurry circulation and slurry transport to the MVST; piping; a ventilation system; a process water system; an instrumentation and control system centered around a programmable logic controller; a video monitoring system; and auxiliary equipment. The earlier version of this plan, which was developed during the preliminary design phase of the project, identified eight scenarios in which waste from the tanks might be released to the environment as a result of unanticipated equipment failure or an accident (e.g., vehicular accident). One of those scenarios, nuclear criticality, is no longer addressed by this plan because the tank waste will be isotopically diluted before sluicing begins. The other seven scenarios have been combined into three, and a fourth, Borehole Miner Failure, has been added as follows: (1) underground release from the tanks; (2) aboveground release or spill from the sluicing system, a tank riser, or the transfer pipeline; (3) release of unfiltered air through the ventilation system; and (4) Borehole Miner arm retraction failure. Methods for preventing, detecting, and responding to each release scenario are set out in the plan

  11. Regional energy planning: some suggestions to public administration

    Energy Technology Data Exchange (ETDEWEB)

    Sozzi, R

    1982-01-01

    A methodology is proposed to estimate the relevant data and to improve the energy efficiency in regional energy planning. The quantification of the regional energy system is subdivided in three independent parameters which are separetely estimated: energy demand, energy consumption, and transformation capacity. Definitions and estimating procedures are given. The optimization of the regional planning includes the application, wherever possible, of the technologies which centralize the space-heating energy production or combine the production of electric energy with space-heating energy distribution.

  12. Regional energy planning: Some suggestions to public administration

    Science.gov (United States)

    Sozzi, R.

    A methodology is proposed to estimate the relevant data and to improve the energy efficiency in regional energy planning. The quantification of the regional energy system is subdivided in three independent parameters which are separetely estimated: energy demand, energy consumption, and transformation capacity. Definitions and estimating procedures are given. The optimization of the regional planning includes the application, wherever possible, of the technologies which centralize the space-heating energy production or combine the production of electric energy with space-heating energy distribution.

  13. 48 CFR 225.7303-4 - Contingent fees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contingent fees. 225.7303....7303-4 Contingent fees. (a) Except as provided in paragraph (b) of this subsection, contingent fees are generally allowable under DoD contracts, provided— (1) The fees are paid to a bona fide employee or a bona...

  14. Risk management and contingency planning for year 2000 - key business decisions for the success of an organization

    International Nuclear Information System (INIS)

    McNeil, J.L.

    1998-01-01

    Factors that transformed Y2K, initially considered as primarily a computer problem, into a business problem are outlined. For example, many organizations have prioritized their inventory of information technology (IT) systems, but few have prioritized their suppliers or customers, or have even thought of what will happen if they cannot get products, or cannot get paid by their customers. Estimates at this time reveal that approximately 30 per cent of businesses will not be operational. This presents a significant risk to any organisation's bottom line. Add to this the status of the world as a whole, where other than about 12 major countries, the majority has not even began to remediate their Y2K problems, and we begin to get a true picture of the potential of major communications problems with subsidiaries, partners or suppliers. Consideration of these factors make it easy to see how Y2K is potentially a major business problem. Because of these risks, it is strongly urged that organizations perform risk management and contingency planning. An example of a risk management approach is presented

  15. Economics, modeling, planning and management of energy

    International Nuclear Information System (INIS)

    Rogner, H.H.; Khan, A.M.; Furlan, G.

    1989-01-01

    The Workshop attended by 89 participants from 40 countries aimed to provide participants with an overview of global and regional issues and to familiarize them with analytical tools and modeling techniques appropriate for the analysis and planning of national energy systems. Emphasis was placed on energy-economy-interaction, modelling for balancing energy demand and supply, technical-economic evaluation of energy supply alternatives and energy demand management. This volume presents some of the lectures delivered at the Workshop. The material has been organized in five parts under the headings General Review of Current Energy Trends, Energy and Technology Menu, Basic Analytical Approaches, Energy Modeling and Planning, and Energy Management and Policy. A separate abstract was prepared for each of the lectures presented. Refs, figs and tabs

  16. Engineering Task Plan for Tank 241-C-106 contingency chiller definitive design

    International Nuclear Information System (INIS)

    Rensink, G.E.; Kriskovich, J.R.

    1995-01-01

    This document identifies the scope, cost, schedule and responsible organizations for completing a design of a contingency ventilation inlet air cooling system for Tank 241-C-106. The air cooling system, described in Rensink (1995), consists of a chiller, cooling coils, and supporting equipment that, when installed will be capable of assuring that the waste temperatures in Tank 241-C-106 are maintained within acceptable limits for safe storage. The effort described herein is scheduled for completion by May 31, 1995 to support Performance Based Incentive (PBI) Milestone SI-2x

  17. Long-term optimal energy mix planning towards high energy security and low GHG emission

    International Nuclear Information System (INIS)

    Thangavelu, Sundar Raj; Khambadkone, Ashwin M.; Karimi, Iftekhar A.

    2015-01-01

    Highlights: • We develop long-term energy planning considering the future uncertain inputs. • We analyze the effect of uncertain inputs on the energy cost and energy security. • Conventional energy mix prone to cause high energy cost and energy security issues. • Stochastic and optimal energy mix show benefits over conventional energy planning. • Nuclear option consideration reduces the energy cost and carbon emissions. - Abstract: Conventional energy planning focused on energy cost, GHG emission and renewable contribution based on future energy demand, fuel price, etc. Uncertainty in the projected variables such as energy demand, volatile fuel price and evolution of renewable technologies will influence the cost of energy when projected over a period of 15–30 years. Inaccurate projected variables could affect energy security and lead to the risk of high energy cost, high emission and low energy security. The energy security is an ability of generation capacity to meet the future energy demand. In order to minimize the risks, a generic methodology is presented to determine an optimal energy mix for a period of around 15 years. The proposed optimal energy mix is a right combination of energy sources that minimize the risk caused due to future uncertainties related to the energy sources. The proposed methodology uses stochastic optimization to address future uncertainties over a planning horizon and minimize the variations in the desired performance criteria such as energy security and costs. The developed methodology is validated using a case study for a South East Asian region with diverse fuel sources consists of wind, solar, geothermal, coal, biomass and natural gas, etc. The derived optimal energy mix decision outperformed the conventional energy planning by remaining stable and feasible against 79% of future energy demand scenarios at the expense of 0–10% increase in the energy cost. Including the nuclear option in the energy mix resulted 26

  18. 76 FR 41987 - Interagency Working Group on Coordination of Domestic Energy Development and Permitting in Alaska

    Science.gov (United States)

    2011-07-15

    ... associated infrastructure in Alaska and to help reduce our dependence on foreign oil, it is hereby ordered as... Response Framework; the National Oil and Hazardous Substances Pollution Contingency Plan (National... Federal engagement with States, localities, and tribal governments, as it relates to energy development...

  19. State of Oregon 4th biennial energy plan

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    State law directs the Oregon Department of Energy (ODOE) to prepare an energy plan every two years. This is the Fourth Biennial Energy Plan. The Plan is a policy blueprint for how to best meet Oregon's future energy needs. It identifies the key energy issues facing the state and sets forth policies and actions to achieve our energy goals of reliable, least-cost, and environmentally safe supply. This book presents: Oregon's demand and supply picture today. The progress Oregon has made toward energy efficiency. Oregon's energy demand and supply outlook for the next 20 years. Estimates of cost-effective conservation and other resources that could contribute to the state's energy supply. The major energy-related health, safety, and environmental issues facing the state. A strategy to reduce greenhouse gas emissions 20 percent from 1988 levels by 2005. A two-year Action Plant that spells out ODOE's recommended actions for achieving Oregon's energy goals

  20. Energy and climate: Brussels plan put to the test; Energie et climat: le plan de Bruxelles mis a l'epreuve

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2008-07-01

    In early 2008, the European Commission presented its highly ambitious plan to reduce greenhouse gas emissions. Two stumbling blocks stand in the way: industry's obvious reluctance, and the unanswered but crucial question of how to fund the proposed measures. Included are measures to reduce energy consumption, increase the share of renewable energies and boost energy efficiency. But controversy surrounds the proposed plan: nuclear power is ignored in the EU document, the plan price tag is 90 billion euros in 2020 and seven member states ask for clarification. The Commission is hoping for approval of its plan before the end of 2008.

  1. Contingency Theories of Leadership: A Study.

    Science.gov (United States)

    Saha, Sunhir K.

    1979-01-01

    Some of the major contingency theories of leadership are reviewed; some results from the author's study of Fiedler's contingency model are reported; and some thoughts for the future of leadership research are provided. (Author/MLF)

  2. Energy Supply and Demand Planning Aspects in Slovenia

    International Nuclear Information System (INIS)

    Tomsic, M.; Urbancic, A.; Al Mansour, F.; Merse, S.

    1997-01-01

    Slovenia can be considered a sufficiently homogenous region, even though specific climatic conditions exist in some parts of the country. Urban regions with high energy consumptions density differ in logistic aspects and in the potential of renewable energy sources. The difference in household energy demand is not significant. The planning study is based on the ''Integrated Resource Planning'' approach. A novel energy planning tool, the MESAP-PlaNet energy system model, supplemented by auxiliary models of technology penetration, electricity demand analysis and optimal expansion planning (the WASP package) has been used. The following segments has been treated in detail: industry, households and both central and local supply systems. Three intensities of energy efficiency strategies are compared: Reference, Moderate and Intensive. The intensity of demand side management programs influence the level and dynamics of activation of conservation potentials. Energy tax is considered in the Moderate and Intensive strategies. On the supply side the issue of domestic coal use is discussed. Reduction in the use of coal is linked to energy efficiency strategies. It has been found that energy efficiency strategies consistently improve economic efficiency, security of supply and protection of health and environment. The only conflicting area is social acceptability, due to both the energy tax reform and the loss of mining jobs. (author)

  3. [Contingencies of self-worth in Japanese culture: validation of the Japanese contingencies of self-worth scale].

    Science.gov (United States)

    Uchida, Yukiko

    2008-08-01

    The author developed a Japanese version of the Contingencies of Self-Worth Scale (CSWS) that was originally developed in the United States (Crocker, Luhtanen, Cooper, & Bouvrette, 2003). The Japanese version of the scale measures seven contingencies of self-esteem: Defeating others in competition, appearance, relationship harmony, other's approval, academic competence, virtue, and support of family and friends. Scores on the scale had systematic relationships with related variables, and the scale therefore exhibited satisfactory levels of construct validity: Relationship harmony, other's approval, and support of family and friends were positively correlated with sympathy and interdependence, whereas competitiveness was negatively correlated with sympathy. Moreover, competitiveness and academic achievement contingencies predicted competitive motivation, whereas the support of family and friends contingency predicted self-sufficient motivation. The scale has adequate test-retest reliability and a seven-factor structural model was confirmed. The implications for self-esteem and interpersonal relationships in Japanese culture are discussed.

  4. Action plan for Nordic energy co-operation 2006-2009

    International Nuclear Information System (INIS)

    2005-01-01

    The Action Plan for Nordic Energy Co-operation 2006-2009 is targeted at creating a visible and sustainable contribution to solving the most important and politically most relevant energy policy challenges faced by the Nordic region. The plan concentrates on three main areas: Energy markets; Sustainable energy system; and Nordic impact on the international agenda. The Action Plan is the energy sector's contribution to the implementation of the Nordic strategy 'Sustainable Development - New Bearing for the Nordic Countries' and to a number of the Nordic Council's recommendations for the development of the Nordic energy sector. An important element of the implementation of the action plan is on-going contact and information sharing between the Nordic Energy Policy co-operation and the Nordic Energy Research. The continues dialogue between the Nordic Council of Energy Ministers and The Nordic Council on future energy policy challenges will likewise be an important part of the political process. (BA)

  5. Optimal planning of integrated multi-energy systems

    DEFF Research Database (Denmark)

    van Beuzekom, I.; Gibescu, M.; Pinson, Pierre

    2017-01-01

    In this paper, a mathematical approach for the optimal planning of integrated energy systems is proposed. In order to address the challenges of future, RES-dominated energy systems, the model deliberates between the expansion of traditional energy infrastructures, the integration...... and sustainability goals for 2030 and 2045. Optimal green- and brownfield designs for a district's future integrated energy system are compared using a one-step, as well as a two-step planning approach. As expected, the greenfield designs are more cost efficient, as their results are not constrained by the existing...

  6. Inevitability, contingency, and epistemic humility.

    Science.gov (United States)

    Kidd, Ian James

    2016-02-01

    This paper offers an epistemological framework for the debate about whether the results of scientific enquiry are inevitable or contingent. I argue in Sections 2 and 3 that inevitabilist stances are doubly guilty of epistemic hubris--a lack of epistemic humility--and that the real question concerns the scope and strength of our contingentism. The latter stages of the paper-Sections 4 and 5-address some epistemological and historiographical worries and sketch some examples of deep contingencies to guide further debate. I conclude by affirming that the concept of epistemic humility can usefully inform critical reflection on the contingency of the sciences and the practice of history of science. Copyright © 2015 Elsevier Ltd. All rights reserved.

  7. 76 FR 36857 - Federal Employees Health Benefits Program: New Premium Rating Method for Most Community Rated Plans

    Science.gov (United States)

    2011-06-23

    ... contingency reserve accounts or factored into reduced premiums for enrollees in the following plan year. Under...-TCR community rated plans' contingency reserves. Issuers failing to meet the FEHB-specific MLR... definition of medical loss ratio by HHS in December 2010, upon which this rule relies. Further, plans have...

  8. Research planning in the energy sector

    International Nuclear Information System (INIS)

    Graenicher, H.

    1977-06-01

    The author considers research planning split into four separate aspects: the character of the research situation; the function of planning stages; the type of research target; and the limit of the application of research planning by planning stages. He then considers the specific problem of energy research and discusses the question of what the state is to do and how to do it with particular attention to the Swiss situation. (G.T.H)

  9. 78 FR 44909 - Regional Reliability Standard BAL-002-WECC-2-Contingency Reserve

    Science.gov (United States)

    2013-07-25

    ...\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242...-002-WECC-2 (Contingency Reserve). The North American Electric Reliability Corporation (NERC) and... (Technical Information), Office of Electric Reliability, Division of Reliability Standards, Federal Energy...

  10. HPC4Energy Final Report : GE Energy

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Steven G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Van Zandt, Devin T. [GE Energy Consulting, Schenectady, NY (United States); Thomas, Brian [GE Energy Consulting, Schenectady, NY (United States); Mahmood, Sajjad [GE Energy Consulting, Schenectady, NY (United States); Woodward, Carol S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2014-02-25

    Power System planning tools are being used today to simulate systems that are far larger and more complex than just a few years ago. Advances in renewable technologies and more pervasive control technology are driving planning engineers to analyze an increasing number of scenarios and system models with much more detailed network representations. Although the speed of individual CPU’s has increased roughly according to Moore’s Law, the requirements for advanced models, increased system sizes, and larger sensitivities have outstripped CPU performance. This computational dilemma has reached a critical point and the industry needs to develop the technology to accurately model the power system of the future. The hpc4energy incubator program provided a unique opportunity to leverage the HPC resources available to LLNL and the power systems domain expertise of GE Energy to enhance the GE Concorda PSLF software. Well over 500 users worldwide, including all of the major California electric utilities, rely on Concorda PSLF software for their power flow and dynamics. This pilot project demonstrated that the GE Concorda PSLF software can perform contingency analysis in a massively parallel environment to significantly reduce the time to results. An analysis with 4,127 contingencies that would take 24 days on a single core was reduced to 24 minutes when run on 4,217 cores. A secondary goal of this project was to develop and test modeling techniques that will expand the computational capability of PSLF to efficiently deal with systems sizes greater than 150,000 buses. Toward this goal the matrix reordering implementation time was sped up 9.5 times by optimizing the code and introducing threading.

  11. 40 CFR 300.205 - Planning and coordination structure.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Planning and coordination structure. 300.205 Section 300.205 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.205 Planning and coordination structure. (a...

  12. 77 FR 52754 - Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning Area

    Science.gov (United States)

    2012-08-30

    ...-FF03E00000] Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning... our planning partners, intend to prepare the Midwest Wind Energy Multi-Species Habitat Conservation... decommissioning of wind energy facilities within all or portions of the eight-State planning area. Activities...

  13. 40 CFR 51.152 - Contingency plans.

    Science.gov (United States)

    2010-07-01

    ... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Prevention of Air Pollution Emergency... emission control actions to be taken at each episode stage. (Examples of emission control actions are set...: (1) Prompt acquisition of forecasts of atmospheric stagnation conditions and of updates of such...

  14. Integrated National Energy Planning (INEP) in developing countries

    International Nuclear Information System (INIS)

    Munasinghe, M.

    1989-01-01

    Issues of coordinated energy planning are emphasized, with particular reference to interrelationships among the policies adopted in various energy sub-sectors such as electric power (including hydro, nuclear, geothermal, oil and coal sources), petroleum, natural gas, coal, non-conventional (solar, bio-gas, mini-hydro) and traditional fuels (woodfuel, bagasse or vegetable residue). The scope and objectives of integrated national energy planning, the policy tools available, and constraints particular to the developing countries are discussed next. Section 3.0 outlines how energy planning is carried out, while the problems of implementing the resulting policy conclusions are examined in section 4.0. 5 refs, 4 figs

  15. 77 FR 60457 - Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning...

    Science.gov (United States)

    2012-10-03

    ...-FF03E00000] Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning... of comments pertaining to the development of the Midwest Wind Energy Multi-Species Habitat..., intend to prepare the Midwest Wind Energy Multi-Species Habitat Conservation Plan (MSHCP) under the...

  16. 48 CFR 1318.201 - Contingency operation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contingency operation. 1318.201 Section 1318.201 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES EMERGENCY ACQUISITIONS Emergency Acquisition Flexibilities 1318.201 Contingency...

  17. 7 CFR 457.9 - Appropriation contingency.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Appropriation contingency. 457.9 Section 457.9 Agriculture Regulations of the Department of Agriculture (Continued) FEDERAL CROP INSURANCE CORPORATION, DEPARTMENT OF AGRICULTURE COMMON CROP INSURANCE REGULATIONS § 457.9 Appropriation contingency...

  18. Relative speed of processing determines color-word contingency learning.

    Science.gov (United States)

    Forrin, Noah D; MacLeod, Colin M

    2017-10-01

    In three experiments, we tested a relative-speed-of-processing account of color-word contingency learning, a phenomenon in which color identification responses to high-contingency stimuli (words that appear most often in particular colors) are faster than those to low-contingency stimuli. Experiment 1 showed equally large contingency-learning effects whether responding was to the colors or to the words, likely due to slow responding to both dimensions because of the unfamiliar mapping required by the key press responses. For Experiment 2, participants switched to vocal responding, in which reading words is considerably faster than naming colors, and we obtained a contingency-learning effect only for color naming, the slower dimension. In Experiment 3, previewing the color information resulted in a reduced contingency-learning effect for color naming, but it enhanced the contingency-learning effect for word reading. These results are all consistent with contingency learning influencing performance only when the nominally irrelevant feature is faster to process than the relevant feature, and therefore are entirely in accord with a relative-speed-of-processing explanation.

  19. Adaptive Planning: Understanding Organizational Workload to Capability/ Capacity through Modeling and Simulation

    Science.gov (United States)

    Hase, Chris

    2010-01-01

    In August 2003, the Secretary of Defense (SECDEF) established the Adaptive Planning (AP) initiative [1] with an objective of reducing the time necessary to develop and revise Combatant Commander (COCOM) contingency plans and increase SECDEF plan visibility. In addition to reducing the traditional plan development timeline from twenty-four months to less than twelve months (with a goal of six months)[2], AP increased plan visibility to Department of Defense (DoD) leadership through In-Progress Reviews (IPRs). The IPR process, as well as the increased number of campaign and contingency plans COCOMs had to develop, increased the workload while the number of planners remained fixed. Several efforts from collaborative planning tools to streamlined processes were initiated to compensate for the increased workload enabling COCOMS to better meet shorter planning timelines. This paper examines the Joint Strategic Capabilities Plan (JSCP) directed contingency planning and staffing requirements assigned to a combatant commander staff through the lens of modeling and simulation. The dynamics of developing a COCOM plan are captured with an ExtendSim [3] simulation. The resulting analysis provides a quantifiable means by which to measure a combatant commander staffs workload associated with development and staffing JSCP [4] directed contingency plans with COCOM capability/capacity. Modeling and simulation bring significant opportunities in measuring the sensitivity of key variables in the assessment of workload to capability/capacity analysis. Gaining an understanding of the relationship between plan complexity, number of plans, planning processes, and number of planners with time required for plan development provides valuable information to DoD leadership. Through modeling and simulation AP leadership can gain greater insight in making key decisions on knowing where to best allocate scarce resources in an effort to meet DoD planning objectives.

  20. Distributed Energy Planning for Climate Resilience

    Energy Technology Data Exchange (ETDEWEB)

    Stout, Sherry R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hotchkiss, Elizabeth L [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Day, Megan H [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Lee, Nathan [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Holm, Alison [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-05-01

    At various levels of government across the United States and globally climate resilient solutions are being adopted and implemented. Solutions vary based on predicted hazards, community context, priorities, complexity, and available resources. Lessons are being learned through the implementation process, which can be replicated regardless of level or type of government entity carrying out the resiliency planning. Through a number of analyses and technical support across the world, NREL has learned key lessons related to resilience planning associated with power generation and water distribution. Distributed energy generation is a large factor in building resilience with clean energy technologies and solutions. The technical and policy solutions associated with distributed energy implementation for resilience fall into a few major categories, including spatial diversification, microgrids, water-energy nexus, policy, and redundancy.

  1. Mini-Membrane Evaporator for Contingency Spacesuit Cooling

    Science.gov (United States)

    Makinen, Janice V.; Bue, Grant C.; Campbell, Colin; Petty, Brian; Craft, Jesse; Lynch, William; Wilkes, Robert; Vogel, Matthew

    2015-01-01

    The next-generation Advanced Extravehicular Mobility Unit (AEMU) Portable Life Support System (PLSS) is integrating a number of new technologies to improve reliability and functionality. One of these improvements is the development of the Auxiliary Cooling Loop (ACL) for contingency crewmember cooling. The ACL is a completely redundant, independent cooling system that consists of a small evaporative cooler--the Mini Membrane Evaporator (Mini-ME), independent pump, independent feedwater assembly and independent Liquid Cooling Garment (LCG). The Mini-ME utilizes the same hollow fiber technology featured in the full-sized AEMU PLSS cooling device, the Spacesuit Water Membrane Evaporator (SWME), but Mini-ME occupies only approximately 25% of the volume of SWME, thereby providing only the necessary crewmember cooling in a contingency situation. The ACL provides a number of benefits when compared with the current EMU PLSS contingency cooling technology, which relies upon a Secondary Oxygen Vessel; contingency crewmember cooling can be provided for a longer period of time, more contingency situations can be accounted for, no reliance on a Secondary Oxygen Vessel (SOV) for contingency cooling--thereby allowing a reduction in SOV size and pressure, and the ACL can be recharged-allowing the AEMU PLSS to be reused, even after a contingency event. The first iteration of Mini-ME was developed and tested in-house. Mini-ME is currently packaged in AEMU PLSS 2.0, where it is being tested in environments and situations that are representative of potential future Extravehicular Activities (EVA's). The second iteration of Mini-ME, known as Mini-ME2, is currently being developed to offer more heat rejection capability. The development of this contingency evaporative cooling system will contribute to a more robust and comprehensive AEMU PLSS.

  2. Contingency learning in human fear conditioning involves the ventral striatum.

    Science.gov (United States)

    Klucken, Tim; Tabbert, Katharina; Schweckendiek, Jan; Merz, Christian Josef; Kagerer, Sabine; Vaitl, Dieter; Stark, Rudolf

    2009-11-01

    The ability to detect and learn contingencies between fearful stimuli and their predictive cues is an important capacity to cope with the environment. Contingency awareness refers to the ability to verbalize the relationships between conditioned and unconditioned stimuli. Although there is a heated debate about the influence of contingency awareness on conditioned fear responses, neural correlates behind the formation process of contingency awareness have gained only little attention in human fear conditioning. Recent animal studies indicate that the ventral striatum (VS) could be involved in this process, but in human studies the VS is mostly associated with positive emotions. To examine this question, we reanalyzed four recently published classical fear conditioning studies (n = 117) with respect to the VS at three distinct levels of contingency awareness: subjects, who did not learn the contingencies (unaware), subjects, who learned the contingencies during the experiment (learned aware) and subjects, who were informed about the contingencies in advance (instructed aware). The results showed significantly increased activations in the left and right VS in learned aware compared to unaware subjects. Interestingly, this activation pattern was only found in learned but not in instructed aware subjects. We assume that the VS is not involved when contingency awareness does not develop during conditioning or when contingency awareness is unambiguously induced already prior to conditioning. VS involvement seems to be important for the transition from a contingency unaware to a contingency aware state. Implications for fear conditioning models as well as for the contingency awareness debate are discussed.

  3. Province of Ontario nuclear emergency plan. Pt. 1

    International Nuclear Information System (INIS)

    1986-06-01

    The Province of Ontario Nuclear Emergency Plan has been developed pursuant to Section 8 of the Emergency Plans Act, 1983. This plan replaces the Province of Ontario Nuclear Contingency Off-Site Plan (June 1980) which is no longer applicable. The wastes plan includes planning, preparation, emergency organization and operational responsibilities and policy

  4. Lancashire and Yorkshire Renewable Energy Planning Study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The central aims of the Lancashire and Yorkshire Renewable Energy Planning Study (LYREPS) are to: identify renewable energy resources in the region and evaluate the opportunities for their deployment; promote a local-level development plan policy framework for the utilisation of renewable energy sources which is fully integrated with established land use and economic development strategies in the region. The availability of the following resources was investigated: landfill gas; municipal and industrial wastes; animal slurry; biomass; straw; active solar; passive solar design; photovoltaics; hydro; and wind. (author)

  5. Contingent and Alternative Work Arrangements, Defined.

    Science.gov (United States)

    Polivka, Anne E.

    1996-01-01

    Discusses the definitions of contingent workers and alternative work arrangements used by the Bureau of Labor Statistics to analyze data, and presents aggregate estimates of the number of workers in each group. Discusses the overlap between contingent workers and workers in alternative arrangements. (Author/JOW)

  6. 40 CFR 51.1012 - Requirement for contingency measures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Requirement for contingency measures... Implementation of PM2.5 National Ambient Air Quality Standards § 51.1012 Requirement for contingency measures... contingency measures to be undertaken if the area fails to make reasonable further progress, or fails to...

  7. Micmac Strategic Energy Planning Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Fred Corey

    2007-02-02

    In February 2005 the Aroostook Band of Micmacs submitted a grant application to the U.S. Department of Energy’s (DOE) Tribal First Steps Program. The purpose of the application was to request funding and technical assistance to identify and document Tribal energy issues, develop a Tribal energy vision, evaluate potential energy opportunities, and to develop an action plan for future Tribal energy activities. The grant application was subsequently funded by DOE, and the Aroostook Band of Micmacs hired an energy consultant to assist with completion of the project. In addition to identification and documentation of Tribal energy issues, and the development of a Tribal energy vision, the potential for wind energy development on Tribal land, and residential energy efficiency issues were thoroughly evaluated.

  8. Pension regulation and the market value of pension liabilities - A contingent claims analysis using Parisian options

    NARCIS (Netherlands)

    Broeders, D.; Chen, A.

    2008-01-01

    We analyze the market-consistent valuation of pension liabilities in a contingent claim framework whereby a knock-out barrier feature is applied to capture early regulatory closure of a pension plan. We investigate two cases which we call "immediate closure procedure" and "delayed closure

  9. The Role of Feedback Contingency in Perceptual Category Learning

    Science.gov (United States)

    Ashby, F. Gregory; Vucovich, Lauren E.

    2016-01-01

    Feedback is highly contingent on behavior if it eventually becomes easy to predict, and weakly contingent on behavior if it remains difficult or impossible to predict even after learning is complete. Many studies have demonstrated that humans and nonhuman animals are highly sensitive to feedback contingency, but no known studies have examined how feedback contingency affects category learning, and current theories assign little or no importance to this variable. Two experiments examined the effects of contingency degradation on rule-based and information-integration category learning. In rule-based tasks, optimal accuracy is possible with a simple explicit rule, whereas optimal accuracy in information-integration tasks requires integrating information from two or more incommensurable perceptual dimensions. In both experiments, participants each learned rule-based or information-integration categories under either high or low levels of feedback contingency. The exact same stimuli were used in all four conditions and optimal accuracy was identical in every condition. Learning was good in both high-contingency conditions, but most participants showed little or no evidence of learning in either low-contingency condition. Possible causes of these effects are discussed, as well as their theoretical implications. PMID:27149393

  10. Ontario's long-term energy plan, building our clean energy future

    International Nuclear Information System (INIS)

    2010-01-01

    The first energy priority of the plan is to provide all Ontarians with a clean, modern and reliable electricity system. It gives a summary of the means implemented to help families and businesses with increasing electricity costs. The plan is to shift the province from a coal-dependent system. Over the next 20 years, 15,000 MW (megawatt) of generating capacity will have to be rebuilt or constructed to replace older Ontario's energy infrastructures. In Ontario, an increase of about 3.5% per year in residential prices, resulting from the need to enjoy clean air, reliable generation and modernized transmission, is expected to occur over the next two decades. The expected electricity needs in Ontario and efficient means to satisfy them are described in this plan.

  11. Commonwealth of the Northern Mariana Islands Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes various energy strategies available to CNMI to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption. The information presented in this strategic energy plan will be used by the CNMI Governor's Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, and expanding the use of a range of energy technologies, including renewable electricity production and buildings energy efficiency and conservation.

  12. 48 CFR 1632.770 - Contingency reserve payments.

    Science.gov (United States)

    2010-10-01

    ... FINANCING Contract Funding 1632.770 Contingency reserve payments. (a) Payments from the contingency reserve... advise the carrier of its decision. However, OPM shall not unreasonably withhold approval for amounts...

  13. Lafayette, Colorado: Using Energy Data for Electric Vehicle Infrastructure Planning (City Energy: From Data to Decisions)

    Energy Technology Data Exchange (ETDEWEB)

    Office of Strategic Programs, Strategic Priorities and Impact Analysis Team

    2017-09-29

    This fact sheet "Lafayette, Colorado: Using Energy Data for Electric Vehicle Infrastructure Planning" explains how the City of Lafayette used data from the U.S. Department of Energy's Cities Leading through Energy Analysis and Planning (Cities-LEAP) and the State and Local Energy Data (SLED) programs to inform its city energy planning. It is one of ten fact sheets in the "City Energy: From Data to Decisions" series.

  14. EM Health and Safety Plan Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    This document contains information about the Health and Safety Plan Guidelines. Topics discussed include: Regulatory framework; key personnel; hazard assessment; training requirements; personal protective equipment; extreme temperature disorders or conditions; medical surveillance; exposure monitoring/air sampling; site control; decontamination; emergency response/contingency plan; emergency action plan; confined space entry; and spill containment.

  15. INVESTIGATION OF CONTINGENCY PATTERNS OF TEACHERS’ SCAFFOLDING IN TEACHING AND LEARNING MATHEMATICS

    Directory of Open Access Journals (Sweden)

    Anwar Anwar

    2016-12-01

    Full Text Available The purpose of this study is to investigate the patterns of scaffolding contingency in teaching and learning mathematics carried out by three teachers. Contingency patterns are obtained by examining the transcription from video recording of conversation fragments between teachers and students during the provision of scaffolding. The contingency patterns are drawn in three strategies: diagnostic strategy, intervention strategy, and checking diagnosis. The result shows that the three teachers expressed different interaction contingencies in their scaffolding activities: contingent dominant, non-contingent dominant, and pseudo-contingent. It is also found that the learning interaction performed by experienced teachers tends to be contingent dominant compared to novice teachers. Keywords: Contingency, Contingent Dominant, Non-Contingent Dominant, Pseudo Contingent, Scaffolding DOI: http://dx.doi.org/10.22342/jme.8.1.3410.65-76

  16. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory

  17. Strategic energy planning in Southern China

    Energy Technology Data Exchange (ETDEWEB)

    Bogach, S.; Ding, G.; Sabourin, J. [Bogach and Associates Ltd. (Canada)

    1995-12-31

    Describes the development and implementation of the Strategic Energy Planning Project for China due to international cooperation between China and Canada. Aspects considered include development of energy resources available, identifying energy shortages of traditional fuels, good quality coal, diesel fuel and electric power, environmental factors and government policies. 16 refs., 2 figs., 1 tab.

  18. Resurgence of instrumental behavior after an abstinence contingency.

    Science.gov (United States)

    Bouton, Mark E; Schepers, Scott T

    2014-06-01

    In resurgence, an extinguished instrumental behavior (R1) recovers when a behavior that has replaced it (R2) is also extinguished. The phenomenon may be relevant to understanding relapse that can occur after the termination of "contingency management" treatments, in which an unwanted behavior (e.g., substance abuse) is reduced by reinforcing an alternative behavior. When reinforcement is discontinued, the unwanted behavior might resurge. However, unlike most resurgence experiments, contingency management treatments also introduce a negative contingency, in which reinforcers are not delivered unless the client has abstained from the unwanted behavior. In two experiments with rats, we therefore examined the effects of adding a negative "abstinence" contingency to the resurgence design. During response elimination, R2 was not reinforced unless R1 had not been emitted for a minimum period of time (45, 90, or 135 s). In both experiments, adding such a contingency to simple R1 extinction reduced, but did not eliminate, resurgence. In Experiment 2, we found the same effect in a yoked group that could earn reinforcers for R2 at the same points in time as the negative-contingency group, but without the requirement to abstain from R1. Thus, the negative contingency per se did not contribute to the reduction in resurgence. These results suggest that the contingency reduced resurgence by making reinforcers more difficult to earn and more widely spaced in time. This could have allowed the animal to learn that R1 was extinguished in the "context" of infrequent reinforcement-a context more like that of resurgence testing. The results are thus consistent with a contextual (renewal) account of resurgence. The method might provide a better model of relapse after termination of a contingency management treatment.

  19. Energy-Performance as a driver for optimal production planning

    International Nuclear Information System (INIS)

    Salahi, Niloofar; Jafari, Mohsen A.

    2016-01-01

    Highlights: • A 2-dimensional Energy-Performance measure is proposed for energy aware production. • This is a novel approach integrates energy efficiency with production requirements. • This approach simultaneously incorporates machine and process related specifications. • The problem is solved as stochastic MILP with constraints addressing risk averseness. • The optimization is illustrated for 2 cases of single and serial machining operation. • Impact of various electricity pricing schemes on proposed production plan is analyzed. - Abstract: In this paper, we present energy-aware production planning using a two-dimensional “Energy-Performance” measure. With this measure, the production plan explicitly takes into account machine-level requirements, process control strategies, product types and demand patterns. The “Energy-Performance” measure is developed based on an existing concept, namely, “Specific Energy” at machine level. It is further expanded to an “Energy-Performance” profile for a production line. A production planning problem is formulated as a stochastic MILP with risk-averse constraints to account for manufacturer’s risk averseness. The objective is to attain an optimal production plan that minimizes the total loss distribution subject to system throughput targets, probabilistic risk constraints and constraints imposed by the underlying “Energy-Performance” pattern. Electricity price and demand per unit time are assumed to be stochastic. Conditional Value at Risk (CVaR) of loss distributions is used as the manufacturer’s risk measure. Both single-machine and production lines are studied for different profiles and electricity pricing schemes. It is shown that the shape of “Energy-Performance” profile can change optimal plans.

  20. Chapter 8: Planning Tools to Simulate and Optimize Neighborhood Energy Systems

    Energy Technology Data Exchange (ETDEWEB)

    Zhivov, Alexander Michael; Case, Michael Patrick; Jank, Reinhard; Eicker, Ursula; Booth, Samuel

    2017-03-15

    This section introduces different energy modeling tools available in Europe and the USA for community energy master planning process varying from strategic Urban Energy Planning to more detailed Local Energy Planning. Two modeling tools used for Energy Master Planning of primarily residential communities, the 3D city model with CityGML, and the Net Zero Planner tool developed for the US Department of Defense installations are described in more details.

  1. Hydrologic modeling as a tool for land management and contingency planning in the Calcasieu Sabine Basin. Volume 1

    International Nuclear Information System (INIS)

    Myers, J.; Meselhe, E.; Kheiashy, K.; Miller, R.; Douglas, C.

    2007-01-01

    The Calcasieu-Sabine Basin in southwest Louisiana contains approximately 126,518 hectares of wetlands, consisting of fresh marsh, intermediate marsh, brackish marsh and saline marsh. The hydrodynamics of the basin involves a combination of estuarine processes such as saltwater intrusion, response to water level fluctuations at an open boundary and lake dynamics. The basin is also affected by deep ship channels. As such, a robust, flexible and efficient numerical model is needed to incorporate all of these processes in an operational program. This study developed a hydrodynamic and salinity model for a portion of the basin that includes the lakes and marshes for the purpose of land management and contingency planning. The newly developed finite-difference hydrodynamic and salinity model is a combination of 1 and 2 dimensional computations and is intended for land, wildlife and habitat management. It can be used as a coastal restoration tool to evaluate the effectiveness of future and ongoing coastal restoration projects. The model was calibrated and validated against field measurements. It was shown to produce accurate simulations of the complex flow patterns of the Calcasieu-Sabine Basin along with information on salinity, water level fluctuations, velocities and discharges throughout the main channels and open water bodies within the area. It was concluded that the model provides a very useful planning and adaptive management tool to improve the understanding of the complex hydrology and salinity circulation pattern within the system. 5 refs., 4 tabs., 9 figs

  2. Conservation and energy efficiency plan 2006

    International Nuclear Information System (INIS)

    2005-11-01

    This plan outlined details of Nova Scotia's proposed $5 million incremental investment in energy efficiency and conservation measures in 2006. The plan was developed through consultation with various Canadian utilities, customers and external stakeholders. A team of stakeholders identified lighting, pricing, partnerships and education as opportunities offering the greatest potential for results. Market research was conducted to identify market potential and the identification of barriers to customer adoption of programs as well as customer expectations regarding program implementation. It was anticipated that the plan will reduce electricity usage and result in significant savings for customers, as well as reducing greenhouse gas (GHG) emissions. The aim of the plan is to help build a conservation and energy efficiency culture in Nova Scotia and to bring Nova Scotia Power together with community-based partners. Specific plans for 2007 included: a 72 GWh reduction in annual electricity usage; approximately $7.7 million in annual savings to customers; a 16 MW reduction in peak electricity demand; and a 50 thousand tonne reduction of GHGs. A business case was presented along with details of proposed residential, commercial and industrial programs. A cost benefit analysis was provided, as well as an outline of the plan's budget and organizational structure. It was concluded that the success of the various program elements will be based on quantitative and qualitative data on the actual effect on energy use of each customer sector, as well as its effect on system demand profiles. Data will be collected through the use of customer surveys, questionnaires, and direct feedback from partners, educators and manufactures and suppliers. 11 tabs., 16 figs

  3. 75 FR 64717 - Convention on Supplementary Compensation for Nuclear Damage Contingent Cost Allocation

    Science.gov (United States)

    2010-10-20

    ... DEPARTMENT OF ENERGY Convention on Supplementary Compensation for Nuclear Damage Contingent Cost... Supplementary Compensation for Nuclear Damage (``CSC'') including its obligation to contribute to an international supplementary fund in the event of certain nuclear incidents. The NOI provided a September 27...

  4. Town of Canmore Energy Management Action Plan (EMAP)

    International Nuclear Information System (INIS)

    2005-03-01

    In 1999, the Town of Canmore, Alberta joined the Federation of Canadian Municipalities' Partners for Climate Protection (PCP) Program and committed to reducing greenhouse gas (GHG) emissions from municipal operations by 20 per cent and community-wide emissions by 6 per cent of 2000 levels by 2012. To date, the City has completed a baseline analysis for municipal operations and the community. It has also initiated an Energy Management Action Plan (EMAP) to identify opportunities in sustainable development through energy, GHG and air quality management. The broad community objectives include housing and transportation management, job creation and local economic development. The city has adopted The Natural Step (TNS) framework which defines sustainability and the guiding principles for decision-making. The objectives of EMAP are to define and evaluate options for a practical strategy and action plan to meet the city's GHG reduction targets; raise local awareness of the issues and opportunities of energy planning and GHG reductions and develop a local action plan outlining action items to reduce energy use and GHG emissions from municipal operations throughout the community. This report explained the methodology and framework for EMAP management and presented a community profile for the Town of Canmore. It also included an energy and emissions inventory and forecast with reference to corporate energy and emissions baseline; community energy and emissions baseline; corporate energy and emissions forecast; community energy and emissions forecast and corporate and community GHG targets. refs., tabs., figs

  5. Conditional Epistemic Planning

    DEFF Research Database (Denmark)

    Andersen, Mikkel Birkegaard; Bolander, Thomas; Jensen, Martin Holm

    2012-01-01

    Recent work has shown that Dynamic Epistemic Logic (DEL) offers a solid foundation for automated planning under partial observability and non-determinism. Under such circumstances, a plan must branch if it is to guarantee achieving the goal under all contingencies (strong planning). Without...... branching, plans can offer only the possibility of achieving the goal (weak planning). We show how to formulate planning in uncertain domains using DEL and give a language of conditional plans. Translating this language to standard DEL gives verification of both strong and weak plans via model checking....... In addition to plan verification, we provide a tableau-inspired algorithm for synthesising plans, and show this algorithm to be terminating, sound and complete....

  6. Energy Efficiency/Renewable Energy Programs in State Implementation Plans - Guidance Documents

    Science.gov (United States)

    final document that provides guidance to States and local areas on quantifying and including emission reductions from energy efficiency and renewable energy measures in State Implementation Plans (SIPS).

  7. Explaining the discrepancy between intentions and actions: the case of hypothetical bias in contingent valuation

    Science.gov (United States)

    Icek Ajzen; Thomas C. Brown; Franklin Carvajal

    2004-01-01

    An experiment was designed to account for intention-behavior discrepancies by applying the theory of planned behavior to contingent valuation. College students (N = 160) voted in hypothetical and real payment referenda to contribute $8 to a scholarship fund. Overestimates of willingness to pay in the hypothetical referendum could not be attributed to moderately...

  8. Nursing's role in Y2K planning.

    Science.gov (United States)

    Simpson, R L

    1999-04-01

    Why haven't more nurses fulfilled their role in Y2K planning? Nurses need to apply their skills and expertise to solving often overlooked problems such as point-of-service applications, transactions with business partners, and contingency planning.

  9. Integrating Structural Health Management with Contingency Control for Wind Turbines

    Directory of Open Access Journals (Sweden)

    Kai Goebel

    2013-01-01

    Full Text Available Maximizing turbine up-time and reducing maintenance costs are key technology drivers for wind turbine operators. Components within wind turbines are subject to considerable stresses due to unpredictable environmental conditions resulting from rapidly changing local dynamics. In that context, systems health management has the aim to assess the state-of-health of components within a wind turbine, to estimate remaining life, and to aid in autonomous decision-making to minimize damage to the turbine. Advanced contingency control is one way to enable autonomous decision-making by providing the mechanism to enable safe and efficient turbine operation. The work reported herein explores the integration of condition monitoring of wind turbine blades with contingency control to balance the trade-offs between maintaining system health and energy capture. Results are demonstrated using a high fidelity simulator of a utility-scale wind turbine.

  10. Wind energy planning in Denmark

    International Nuclear Information System (INIS)

    Godtfredsen, F.; Lemming, J.; Nielsen, S.R.; Jessien, S.

    1992-01-01

    The total capacity of the about 3300 Danish wind turbines is approximately 450 MW. Most of the wind turbines have been erected detached or in small clusters by private citizens - especially by joint ownership. 100 MW of the capacity have been installed by the power companies, mainly in wind farms. Up till now the privately owned wind turbines have been erected without a previous planning process. Increased expansion of wind energy makes demands on physical planning, since access to suitable locations in Denmark is limited. Hence more coordination is called for between the interested parties to ensure optimal utilization of the sites allocated by the physical planning authorities. A siting committee appointed by the Government has recommended locations for additional 100 MW power company wind farms as well as a more detailed planning in each local community. The detailed planning in the municipality of Thisted is described. (au)

  11. A least square support vector machine-based approach for contingency classification and ranking in a large power system

    Directory of Open Access Journals (Sweden)

    Bhanu Pratap Soni

    2016-12-01

    Full Text Available This paper proposes an effective supervised learning approach for static security assessment of a large power system. Supervised learning approach employs least square support vector machine (LS-SVM to rank the contingencies and predict the system severity level. The severity of the contingency is measured by two scalar performance indices (PIs: line MVA performance index (PIMVA and Voltage-reactive power performance index (PIVQ. SVM works in two steps. Step I is the estimation of both standard indices (PIMVA and PIVQ that is carried out under different operating scenarios and Step II contingency ranking is carried out based on the values of PIs. The effectiveness of the proposed methodology is demonstrated on IEEE 39-bus (New England system. The approach can be beneficial tool which is less time consuming and accurate security assessment and contingency analysis at energy management center.

  12. Equivalence relations and the reinforcement contingency.

    Science.gov (United States)

    Sidman, M

    2000-07-01

    Where do equivalence relations come from? One possible answer is that they arise directly from the reinforcement contingency. That is to say, a reinforcement contingency produces two types of outcome: (a) 2-, 3-, 4-, 5-, or n-term units of analysis that are known, respectively, as operant reinforcement, simple discrimination, conditional discrimination, second-order conditional discrimination, and so on; and (b) equivalence relations that consist of ordered pairs of all positive elements that participate in the contingency. This conception of the origin of equivalence relations leads to a number of new and verifiable ways of conceptualizing equivalence relations and, more generally, the stimulus control of operant behavior. The theory is also capable of experimental disproof.

  13. Contingency planning and risk analysis for water and tailings management at Ranger Uranium Mines

    International Nuclear Information System (INIS)

    McNally, P.E.

    1986-01-01

    This paper describes some of the more likely risks and contingency procedures associated with the extremely variable monsoonal climate of the Alligator Rivers region in the Northern Territory in relation to the Ranger Uranium Mine. The tailings management system is basically a large storage impoundment and a reticulation system that delivers tailings sludge and recycles supernatant water. It is a closed circuit within the water management system and is dealt with as an integral part of that system

  14. Environmental performance evaluation of Beijing's energy use planning

    International Nuclear Information System (INIS)

    Wang Lei; Xu Linyu; Song Huimin

    2011-01-01

    In line with rapid economic development, urban energy consumption is increasing rapidly, resulting in environmental problems. After considering several methods to evaluate the environmental performance of energy use, including: energy ecological footprint, input-output analysis, emergy-exergy analysis, and multi-criteria decision-making, an environmental performance evaluation model is proposed, which combines the analytical hierarchy process, fuzzy extent analysis, and membership degree analysis. In the model, 18 sub-indicators of environmental performance from energy use planning are classified into four categories: structure of energy use and industry, technology and efficiency of energy use, environmental impacts caused by energy use, and the socio-economic benefits of energy use. Membership degree analysis is applied to each indicator. Three energy use scenarios which are, respectively, environment-friendly, technology-led, and economic policy-led are evaluated. The results show that the technology-led energy use planning is best. The sustainable energy use policies are proposed from three aspects, including optimizing the energy use and industrial structure, encouraging development of energy-saving and air pollution control technologies, and enhancing legislation on energy use management. The policies are helpful to optimize the trade-offs between economic growth and environmental protection in Beijing. - Highlights: → Our paper establishes a system of indicators according to the structure of urban energy use planning. → We have created a comprehensive environmental performance evaluation model in the research. → The model and results can serve as an important basis for decision-making to guide local government.

  15. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy`s Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  16. Energy and nuclear power planning study for Armenia

    International Nuclear Information System (INIS)

    2004-07-01

    The Energy and Nuclear Power Planning (ENPP) study for Armenia has been conducted under the technical cooperation programme of the International Atomic Energy Agency (IAEA). The objective of the study was to analyze the electricity demand as part of the total final energy demand in various scenarios of Armenian socioeconomic and technological development, and to develop economically optimized electric generating system expansion plans for meeting the electric power demand, and to assess the role that nuclear energy could play within these optimal programs. The specific objectives of this study were: to define the role that nuclear power could play in the future electricity supply in Armenia, based on a least-cost expansion planning analysis of the country's power system; to analyze the environmental impacts of such a nuclear power development; to evaluate the financial viability of the envisaged nuclear power development program; to train a group of Armenian experts in the use of the IAEA's energy models

  17. Energy and nuclear power planning in developing countries

    International Nuclear Information System (INIS)

    1985-01-01

    In this publication of the IAEA, after the introduction, four substantive parts follow. Part I, Energy demand and rational energy supply, deals with the needs for energy, primary energy resources and reserves, energy transport, storage, distribution and conservation, including the environmental effects on energy development. Part II, Economic aspects of energy development, presents an integrated view of the basic concepts of energy economics, evaluation of alternative energy projects with an in-depth comparison of electricity generation costs of nuclear and fossil-fuelled power plants. Part III, World energy development status and trends, begins with an overview of the world energy status and trends and continues with a presentation of the energy situation in industrialized countries and in developing countries. Part IV, Energy planning, deals with the optimization techniques, energy planning concepts and computerized models. The launching conditions and implementation of a nuclear power programme are described in detail. 582 references are given in the text and a bibliographical list of 356 titles has been added

  18. Energy Strategy and Regional Planning in Croatia

    International Nuclear Information System (INIS)

    Toljan, I.

    1997-01-01

    The paper describes the relationship between energy strategy and regional planning in Croatia, the targets, environmental issues and preconditions to be met for the establishment of a modern energy sector. (author)

  19. Municipal Energy Planning under Conditions of Globalization: Imperatives and Objectives

    Directory of Open Access Journals (Sweden)

    Horban Vasylyna B.

    2017-12-01

    Full Text Available The article reveals the importance of energy planning for local authorities in the path of achieving the goals of sustainable development. The quintessence of energy planning in territorial communities of Ukraine and Europe has been outlined from the perspective of analyzing the infrastructure sectors of the municipal economy. The article is based on observing certain international methodologies related to local energy and climate planning. The evolution of Covenant of Mayors initiative is briefly described with a focus on its intensive expanding in terms of energy and climate issues. The experience in the development of municipal sustainable energy and climate action plans in European countries and Ukraine is studied. A survey of empirical data on the consumption of fuel and energy resources and greenhouse gas emissions in territorial communities of Ukraine and European countries is conducted. The European methodological guidelines on the subject under study are highlighted based on the key policy documents. A few practical examples of Ukrainian and European cities are presented in order to illustrate possible actions corresponding to the defined problem. A systematic framework is proposed to describe the various and complex aspects of energy planning in cities with regard to rational implementation of energy efficient measures. The innovative mechanisms, main barriers and opportunities for the effective implementation of energy efficient projects in territorial communities of Ukraine and European countries are revealed. It is substantiated that under the current conditions of globalization, using project-oriented paradigm, municipal energy planning instruments become key motivational factors for development sustainable energy policy.

  20. Energy in urban and regional planning. ; Energia yhdyskuntasuunnittelussa. Rohkeita ratkaisuja kestaevaempaeaen tulevaisuuteen

    Energy Technology Data Exchange (ETDEWEB)

    Ahonen, A.-M.; Nuorkivi, A. (eds.)

    2013-03-01

    Urban and regional planner is the first in the row to choose whether any renewable energy system, comprising production, storing and distribution, will be economic and environmentally sound in the subject planning area during the years to come. In order make right choices, understanding of the links prevailing between urban and energy planning as well as co-planning with energy experts is essential. So far there has not been systematic training to develop these competencies among urban and regional planners. In the UP-RES project (Urban Planners with Renewable Energy Skills) the project partners organized several pilot trainings in Germany, Hungary, Spain and the United Kingdom during 2011-2012. The objective of the pilots was to train planners understand the basics of renewable energy and energy related emissions. Training of urban and regional planners to understand energy issues as well as supporting co-planning between energy and urban planning experts have appeared to be productive ways towards more sustainable communities. This publication has been an essential part of the Finnish pilot training. The learning project case reports in this publication have been written by the training participants as a completion of their course. The cases were made in groups and the topics were chosen by the groups themselves. All projects focused on utilizing renewable energies and promoting energy efficiency in urban and regional planning. This publication consists of five reports: Inclusion of energy on various hierarchical levels of planning: major pain spots, gate keepers and points of impact. Comparison of measuring tools for renewable energy and energy efficiency. Inclusion of renewable energy systems and energy efficiency in regional planning cases in Finnish cities of Oulu, Espoo, Jyvaskyla and Kuopio. Metamorphosis of Talma village to a sustainable suburban area. Measures to improve energy efficiency of spatial plans. Based on the project reports, energy

  1. Contingency blindness: location-identity binding mismatches obscure awareness of spatial contingencies and produce profound interference in visual working memory.

    Science.gov (United States)

    Fiacconi, Chris M; Milliken, Bruce

    2012-08-01

    The purpose of the present study was to highlight the role of location-identity binding mismatches in obscuring explicit awareness of a strong contingency. In a spatial-priming procedure, we introduced a high likelihood of location-repeat trials. Experiments 1, 2a, and 2b demonstrated that participants' explicit awareness of this contingency was heavily influenced by the local match in location-identity bindings. In Experiment 3, we sought to determine why location-identity binding mismatches produce such low levels of contingency awareness. Our results suggest that binding mismatches can interfere substantially with visual-memory performance. We attribute the low levels of contingency awareness to participants' inability to remember the critical location-identity binding in the prime on a trial-to-trial basis. These results imply a close interplay between object files and visual working memory.

  2. Sustainable resource planning in energy markets

    International Nuclear Information System (INIS)

    Kamalinia, Saeed; Shahidehpour, Mohammad; Wu, Lei

    2014-01-01

    Highlights: • Sustainable resource planning with the consideration of expected transmission network expansion. • Incomplete information non-cooperative game-theoretic method for GEP. • Maximizing utility value whiling considering merits of having various generation portfolios. • Minimizing risk of investment using renewable generation options. • Application of the stochastic approach for evaluating the unpredictability of opponent payoffs and commodity values. - Abstract: This study investigates the role of sustainable energy volatility in a market participant’s competitive expansion planning problem. The incomplete information non-cooperative game-theoretic method is utilized in which each generation company (GENCO) perceives strategies of other market participants in order to make a decision on its strategic generation capacity expansion. Sustainable generation incentives, carbon emission penalties, and fuel price forecast errors are considered in the strategic decisions. The market clearing process for energy and reserves is simulated by each GENCO for deriving generation expansion decisions. A merit criterion (i.e., the utility value) is proposed for a more realistic calculation of the expected payoff of a GENCO with sustainable energy resources. Finally, the impact of transmission constraints is investigated on the GENCO’s expansion planning decision. The case studies illustrate the effectiveness of the proposed method

  3. Long-term energy planning with uncertain environmental performance metrics

    International Nuclear Information System (INIS)

    Parkinson, Simon C.; Djilali, Ned

    2015-01-01

    Highlights: • Environmental performance uncertainty considered in a long-term energy planning model. • Application to electricity generation planning in British Columbia. • Interactions with climate change mitigation and adaptation strategy are assessed. • Performance risk-hedging impacts the technology investment strategy. • Sensitivity of results to model formulation is discussed. - Abstract: Environmental performance (EP) uncertainties span a number of energy technology options, and pose planning risk when the energy system is subject to environmental constraints. This paper presents two approaches to integrating EP uncertainty into the long-term energy planning framework. The methodologies consider stochastic EP metrics across multiple energy technology options, and produce a development strategy that hedges against the risk of exceeding environmental targets. Both methods are compared within a case study of emission-constrained electricity generation planning in British Columbia, Canada. The analysis provides important insight into model formulation and the interactions with concurrent environmental policy uncertainties. EP risk is found to be particularly important in situations where environmental constraints become increasingly stringent. Model results indicate allocation of a modest risk premium in these situations can provide valuable hedging against EP risk

  4. Skype me! Socially Contingent Interactions Help Toddlers Learn Language

    Science.gov (United States)

    Roseberry, Sarah; Hirsh-Pasek, Kathy; Golinkoff, Roberta Michnick

    2013-01-01

    Language learning takes place in the context of social interactions, yet the mechanisms that render social interactions useful for learning language remain unclear. This paper focuses on whether social contingency might support word learning. Toddlers aged 24- to 30-months (N=36) were exposed to novel verbs in one of three conditions: live interaction training, socially contingent video training over video chat, and non-contingent video training (yoked video). Results suggest that children only learned novel verbs in socially contingent interactions (live interactions and video chat). The current study highlights the importance of social contingency in interactions for language learning and informs the literature on learning through screen media as the first study to examine word learning through video chat technology. PMID:24112079

  5. QV modal distance displacement - a criterion for contingency ranking

    Energy Technology Data Exchange (ETDEWEB)

    Rios, M.A.; Sanchez, J.L.; Zapata, C.J. [Universidad de Los Andes (Colombia). Dept. of Electrical Engineering], Emails: mrios@uniandes.edu.co, josesan@uniandes.edu.co, cjzapata@utp.edu.co

    2009-07-01

    This paper proposes a new methodology using concepts of fast decoupled load flow, modal analysis and ranking of contingencies, where the impact of each contingency is measured hourly taking into account the influence of each contingency over the mathematical model of the system, i.e. the Jacobian Matrix. This method computes the displacement of the reduced Jacobian Matrix eigenvalues used in voltage stability analysis, as a criterion of contingency ranking, considering the fact that the lowest eigenvalue in the normal operation condition is not the same lowest eigenvalue in N-1 contingency condition. It is made using all branches in the system and specific branches according to the IBPF index. The test system used is the IEEE 118 nodes. (author)

  6. Energy management information systems - planning manual and tool

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    An Energy Management Information System (EMIS) provides relevant information that makes energy, performance visible to various levels of an organization, enabling individuals and departments to plan, make decisions and take effective action to manage energy. This manual has two objectives: 1. To enable companies to conduct EMIS audits and prepare EMIS implementation plans; 2. To provide companies with the tools to prepare a financial business case for EMIS implementation. This manual consists of four parts: 1. EMIS Audit is theoretical and provides the methodology to be used by outside or in-house engineers and consultants to do a thorough EMIS Audit. 2. Implementation Plan is to help industry do the work themselves. 3. Appendices is to help the user develop an EMIS Audit, gather data and score their company, prepare a conceptual and detailed design, as well as a business and financial plan for implementation.

  7. Rethinking Participation in Smart Energy System Planning

    NARCIS (Netherlands)

    Lammers, Imke; Arentsen, Maarten J.

    2017-01-01

    While the technical layout of smart energy systems is well advanced, the implementation of these systems is slowed down by the current decision-making practice regarding such energy infrastructures. We call for a reorganisation of the decision-making process on local energy planning and address the

  8. Review of Defence Plans in Europe: Current Status, Strengths and Opportunities

    DEFF Research Database (Denmark)

    De Boeck, Steven; Van Hertem, Dirk; Das, Kaushik

    2016-01-01

    interconnected, a contingency in one area can affect the whole power system and possibly lead to a wide area black out. Therefore adequate defence plans need to be designed and in place to handle these situations. This paper starts with an overview of the terminology used in defence plans. Subsequently...... the current status of defence plans in Europe and the preferred sequence of actions to mitigate contingencies, is given based on a survey conducted among several European TSOs. Furthermore his paper gives an overview of how the ongoing changes with renewables, phasor measurement units (PMUs), power flow...

  9. Contingent Employment in the Netherlands

    OpenAIRE

    Pot, F.; Koene, Bas; Paauwe, Jaap

    2001-01-01

    textabstractIn the last decade the Dutch labour market has demonstrated an admirable capacity to generate jobs. Consequently, the unemployment rate has significantly decreased. However, the newly generated jobs are a-typical in the sense that they are not full-time jobs based on open-ended contracts. Instead, the job growth has relied on the growth of part-time and contingent jobs. While the creation of part-time jobs seems to be employee-driven, contingent employment, in contrast, seems to b...

  10. Contingency Management and deliberative decision-making processes

    Directory of Open Access Journals (Sweden)

    Paul S. Regier

    2015-06-01

    Full Text Available Contingency Management is an effective treatment for drug addiction. The current explanation for its success is rooted in alternative reinforcement theory. We suggest that alternative reinforcement theory is inadequate to explain the success of Contingency Management and produce a model based on demand curves that show how little the monetary rewards offered in this treatment would affect drug use. Instead, we offer an explanation of its success based on the concept that it accesses deliberative decision-making processes. We suggest that Contingency Management is effective because it offers a concrete and immediate alternative to using drugs, which engages deliberative processes, improves the ability of those deliberative processes to attend to non-drug options, and offsets more automatic action-selection systems. This theory makes explicit predictions that can be tested, suggests which users will be most helped by Contingency Management, and suggests improvements in its implementation.

  11. Contingency Management and Deliberative Decision-Making Processes.

    Science.gov (United States)

    Regier, Paul S; Redish, A David

    2015-01-01

    Contingency management is an effective treatment for drug addiction. The current explanation for its success is rooted in alternative reinforcement theory. We suggest that alternative reinforcement theory is inadequate to explain the success of contingency management and produce a model based on demand curves that show how little the monetary rewards offered in this treatment would affect drug use. Instead, we offer an explanation of its success based on the concept that it accesses deliberative decision-making processes. We suggest that contingency management is effective because it offers a concrete and immediate alternative to using drugs, which engages deliberative processes, improves the ability of those deliberative processes to attend to non-drug options, and offsets more automatic action-selection systems. This theory makes explicit predictions that can be tested, suggests which users will be most helped by contingency management, and suggests improvements in its implementation.

  12. Urban energy planning in Tartu

    DEFF Research Database (Denmark)

    Große, Juliane; Groth, Niels Boje; Fertner, Christian

    The Estonian planning system allots the main responsibilities for planning activities to the local level, whereas the regional level (county) is rather weak. That implies a gap of cooperation on the regional level, leading to dispersed urban development in suburban municipalities and ongoing urban...... sprawl in the vicinity of Tartu. This development appears contrary to the concept of “low-density urbanised space” as formulated in the National Spatial Plan “Estonia 2030+” (NSP) as the central spatial development concept for Estonia and also to a compact and intensive city development as formulated...... in the Master Plan of Tartu. Since Tartu has no relevant big industries, the main employers are the municipality and the university, energy related challenges occur from transport and residential (district) heating. The modal split shows big differences between journeys within Tartu and journeys between Tartu...

  13. Energy-oriented planning of enterprises. Energieorientierte Unternehmensplanung

    Energy Technology Data Exchange (ETDEWEB)

    Hoffmann, H

    1983-01-01

    The book first of all analysis, from an energy point of view, the planning field, which can be characterized by factors relating to the enterprise, environmental factors and the basic business policy pursued. Chapter 2 deals with the enterprise parameters that form the object of planning. Different variables of action are pointed out: aims, strategies (and/or stratetic paths), and actions related to certain areas of function. The aims to be fixed are closely connected with the basic business policy and are discussed in this context. In the part dealing with strategies, particular attention is paid to the efficiency-oriented path ''rational energy utilization'' and the effectiveness-oriented path ''energy-oriented product and market design''. Both strategic framework concepts are viewed in close relation to the aims envisaged, the basic business policy and the environmental and business analysis, and are worked out in this connection. The general strategy discussion covering all sectors is followed by a detailed analysis of the action potential specific to certain areas of function. The physical transformation stages procurement, production and sale are chosen as areas of function to be investigated. Finally the book discusses questions related to the realization of energy concepts. These are, besides implementation conditions and control tasks, resistances encountered and the limits of energy-oriented planning.

  14. Energy Resource Planning. Optimal utilization of energy resources

    International Nuclear Information System (INIS)

    Miclescu, T.; Domschke, W.; Bazacliu, G.; Dumbrava, V.

    1996-01-01

    For a thermal power plants system, the primary energy resources cost constitutes a significant percentage of the total system operational cost. Therefore a small percentage saving in primary energy resource allocation cost for a long term, often turns out to be a significant monetary value. In recent years, with a rapidly changing fuel supply situation, including the impact of energy policies changing, this area has become extremely sensitive. Natural gas availability has been restricted in many areas, coal production and transportation cost have risen while productivity has decreased, oil imports have increased and refinery capacity failed to meet demand. The paper presents a mathematical model and a practical procedure to solve the primary energy resource allocation. The objectives is to minimise the total energy cost over the planning period subject to constraints with regards to primary energy resource, transportation and energy consumption. Various aspects of the proposed approach are discussed, and its application to a power system is illustrated.(author) 2 figs., 1 tab., 3 refs

  15. Turning negative memories around: Contingency versus devaluation techniques.

    Science.gov (United States)

    Dibbets, Pauline; Lemmens, Anke; Voncken, Marisol

    2018-09-01

    It is assumed that fear responses can be altered by changing the contingency between a conditioned stimulus (CS) and an unconditioned stimulus (US), or by devaluing the present mental representation of the US. The aim of the present study was to compare the efficacy of contingency- and devaluation-based intervention techniques on the diminishment in - and return of fear. We hypothesized that extinction (EXT, contingency-based) would outperform devaluation-based techniques regarding contingency measures, but that devaluation-based techniques would be most effective in reducing the mental representation of the US. Additionally, we expected that incorporations of the US during devaluation would result in less reinstatement of the US averseness. Healthy participants received a fear conditioning paradigm followed by one of three interventions: extinction (EXT, contingency-based), imagery rescripting (ImRs, devaluation-based) or eye movement desensitization and reprocessing (EMDR, devaluation-based). A reinstatement procedure and test followed the next day. EXT was indeed most successful in diminishing contingency-based US expectancies and skin conductance responses (SCRs), but all interventions were equally successful in reducing the averseness of the mental US representation. After reinstatement EXT showed lowest expectancies and SCRs; no differences were observed between the conditions concerning the mental US representation. A partial reinforcement schedule was used, resulting in a vast amount of contingency unaware participants. Additionally, a non-clinical sample was used, which may limit the generalizability to clinical populations. EXT is most effective in reducing conditioned fear responses. Copyright © 2018 Elsevier Ltd. All rights reserved.

  16. Energy secretary Spencer Abraham announces department of energy 20-year science facility plan

    CERN Multimedia

    2003-01-01

    "In a speech at the National Press Club today, U.S. Energy Secretary Spencer Abraham outlined the Department of Energy's Office of Science 20-year science facility plan, a roadmap for future scientific facilities to support the department's basic science and research missions. The plan prioritizes new, major scientific facilities and upgrades to current facilities" (1 page).

  17. Societal Planning: Identifying a New Role for the Transport Planner-Part II: Planning Guidelines

    DEFF Research Database (Denmark)

    Khisty, C. Jotin; Leleur, Steen

    1997-01-01

    The paper seeks to formulate planning guidelines based on Habermas's theory of communicative action. Specifically, this has led to the formulation of a set of four planning validity claims concerned to four types of planning guidelines concerning adequacy, dependency, suitability and adaptability......-a-vis the planning validity claims. Among other things the contingency of this process is outlined. It is concluded (part I & II) that transport planners can conveniently utilize the guidelines in their professional practice, tailored to their particular settings....

  18. Strategic Energy Planning in the Öresund Region

    DEFF Research Database (Denmark)

    Lund, Rasmus Søgaard; Sperling, Karl; Mathiesen, Brian Vad

    on the national goals and direction of development and the municipalities’ role and potential to act in this context. The results contain a number of policy recommendations to improve the municipalities’ ability to do strategic energy planning (SEP) e.g. in Sweden to have more ambitious goals and in Denmark......In this project the municipalities’ role in the transition to a renewable energy system is studied. For the study municipalities in Sweden and Denmark located in the Öresund Region have been chosen as cases. A number of interviews have been carried out to give the perspective of municipal planning...... to have requirements of doing SEP. A number of areas with potential knowledge transfer have also been identified. For example to use the Swedish experience with environmental assessment of energy plans in Denmark or to use the Danish experience with a progression in time in the building energy codes...

  19. Efficient energy utilization and environmental issues applied to power planning

    International Nuclear Information System (INIS)

    Campbell, Hector; Montero, Gisela; Perez, Carlos; Lambert, Alejandro

    2011-01-01

    This document shows the importance of policies for electric energy savings and efficient energy utilization in power planning. The contributions of economic, social, and environmental items were evaluated according to their financial effects in the delay of investments, reduction of production costs and decrement of environmental emissions. The case study is Baja California, Mexico; this system has a unique primary source: geothermal energy. Whether analyzing the planning as usual or planning from the supply side, the forecast for 2005-2025 indicates that 4500 MW additional installed capacity will be required (3-times current capacity), representing an investment that will emit 12.7 Mton per year of CO 2 to the atmosphere and will cost US$2.8 billion. Systemic planning that incorporates polices of energy savings and efficiency allows the reduction of investments and pollutant emissions. For example, a reduction of 20% in the growth trend of the electricity consumption in the industrial customers would save US$10.4 billion over the next 20 years, with a potential reduction of 1.6 Mton/year of CO 2 . The increase in geothermal power generation is also attractive, and it can be combined with the reduction of use and energy losses of utilities, which would save US$13.5 billion and prevent the discharge of 8.5 Mton/year of CO 2 . - Highlights: → We contrast power planning methods for supply electricity for economy development. → Importance of policies for electricity savings and efficient use in power planning. → Systemic planning facilitates decision-making process for electricity optimization. → Supply-side planning will cause climb in prices and loss of energy self-sufficiency. → Power planning should be immersed in an environment of appropriate energy policies.

  20. Developing The Organized Village of Kasaan's Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Hamar, Glenn P. [The Organized Village of Kasaan, Ketchikan, AK (United States)

    2013-02-01

    The overall goal of this project is to create a Tribal Energy Action Plan that will serve as the Tribe's blueprint for creating long term energy self sufficiency. The Plan will be developed with input from a committed group of key stakeholders and landowners in the area, will be based on sound data and research, and will address both supply side options of the development of sustainable energy sources, as well as demand-side options for reducing energy consumption. The resulting plan will include defined comprehensive energy strategies and built upon a baseline assessment of where the Tribe currently is in terms of alternative and renewable energy activities; a vision of where the Tribe wants to go; and an action plan of how the Tribe will reach its vision including the identification of viable energy options based on the long-term strategic plan of the Tribe.

  1. Developing a regional energy plan for two counties in Ireland

    DEFF Research Database (Denmark)

    Connolly, David; Mathiesen, Brian Vad; Lund, Henrik

    2011-01-01

    Developing a sustainable energy supply will most likely require a transition from large-scale centralised plants to decentralised distributed generation. Consequently, local planning authorities will play a more important role in energy planning in the coming years, as more decentralised energy f...

  2. Breaking the Myth of Flexible Work: Contingent Work in Toronto. A Study Conducted by the Contingent Workers Project.

    Science.gov (United States)

    de Wolff, Alice

    A survey of 205 people, 4 group interviews with approximately 30 people, and 6 design and analysis meetings involving approximately 40 people were conducted in a 1999 participatory study of contingent workers in Toronto. (Contingent work was defined to be lower-waged forms of non-permanent work arrangements that include contracting, employment…

  3. The role of nuclear energy in the Italian National Energy Plan

    International Nuclear Information System (INIS)

    Di Menza, R.

    1984-01-01

    The Italian energy pattern is today still characterized by a worrisome and high use of oil. If one examines data taken from 1980's final balance, which are unlikely to vary much during 1981, one finds, in fact, that oil covers 67.3% of Italy's total energy consumption and that oil contribution to generate electric power is also of considerable importance: 55.8%. Among all western countries, only Japan presents a similar structure of primary energy use. On the other hand, the nuclear source provided but a modest contribution towards meeting electricity production: in 1980, it accounted for 1.2% in Italy against 23.3% in France, 14 Mwg in the United Kingdom, 11.8% in the United States, 11.5% in the Federal Republic of Germany, and 10.1% in Canada. If the Italian energy situation were to be assessed on the basis of the above data, one would have to draw a negative prognosis on the competitive position of the Italian industry in the international market. A moderately optimistic position can, however, be justified by the recent evolution of the political and industrial scene. A short time ago, the Government submitted to Parliament a new National Energy Plan. The Plan includes significant energy conservation measures and sets a 1990 objective 185 MTOE as total energy demand against the corresponding value of 146.9 MTOE for 1980. To achieve this result specific measures are required. In order to further eliminate waste, it is necessary to introduce energy saving technologies, modify the industrial mix and adopt adequate tariff policies. The plan assigns each source alternative to petroleum the realistic maximum role it can play in reducing oil dependence. The role of nuclear energy together with that of coal is considered essential

  4. Reporting, Recording, and Transferring Contingency Demand Data

    National Research Council Canada - National Science Library

    Smith, Bernard

    2000-01-01

    .... In this report, we develop a standard set of procedures for reporting and recording demand data at the contingency location and transferring contingency demand data to the home base - ensuring proper level allocation and valid worldwide peacetime operating stock (POS) and readiness spares package (RSP) requirements.

  5. Optimal Investment Planning of Bulk Energy Storage Systems

    Directory of Open Access Journals (Sweden)

    Dina Khastieva

    2018-02-01

    Full Text Available Many countries have the ambition to increase the share of renewable sources in electricity generation. However, continuously varying renewable sources, such as wind power or solar energy, require that the power system can manage the variability and uncertainty of the power generation. One solution to increase flexibility of the system is to use various forms of energy storage, which can provide flexibility to the system at different time ranges and smooth the effect of variability of the renewable generation. In this paper, we investigate three questions connected to investment planning of energy storage systems. First, how the existing flexibility in the system will affect the need for energy storage investments. Second, how presence of energy storage will affect renewable generation expansion and affect electricity prices. Third, who should be responsible for energy storage investments planning. This paper proposes to assess these questions through two different mathematical models. The first model is designed for centralized investment planning and the second model deals with a decentralized investment approach where a single independent profit maximizing utility is responsible for energy storage investments. The models have been applied in various case studies with different generation mixes and flexibility levels. The results show that energy storage system is beneficial for power system operation. However, additional regulation should be considered to achieve optimal investment and allocation of energy storage.

  6. The impact of high penetration of wind energy on the vulnerability of power systems

    Energy Technology Data Exchange (ETDEWEB)

    EL-Arroudi, K.; Joos, G.; McGillis, D. [McGill Univ., Montreal, PQ (Canada). Dept. of Electrical and Computer Engineering

    2006-07-01

    This paper examined the impact of higher penetrations of wind energy installations on the vulnerability of power systems. Vulnerability was defined in terms of migration of system states based on the contingencies that might occur. It was noted that both the penetration levels and physical locations of wind energy installations in power systems have a strong influence on system vulnerability. A methodology was proposed to analyze the impacts of wind energy on power system vulnerability through the construction of a decision-tree classification model at the point of common coupling (PCC) bus. The aim of the model was to determine planning criteria for wind power interconnection and to ensure that design concepts are adequate and secure. The model was built by simulating a pre-specified range of system contingencies to generate patterns at the PCC bus. Actual measurements were then compared against known patterns, from which the stress levels of disturbances were estimated. Stress levels were defined in terms of the performance level measures delineated by National Electricity Reliability Council (NERC) planning standards. The methodology is a non-parametric learning technique able to produce classifiers about given problems in order to deduce information from new, unobserved cases. A case study consisting of a 4-machine system with a total generation of 2295 MW was presented where wind-based generation accounted for 450 MW. The decision-tree classifier was constructed by simulating 120 events generated by combinations of contingencies; seasonal wind patterns and different wind production levels per season. Results showed that with a knowledge of the total penetration level and location of wind power installations, it is possible to estimate the effect of wind energy on the vulnerability of a power system. 12 refs., 6 figs.

  7. Sartre's Contingency of Being and Asouzu's Principle of Causality ...

    African Journals Online (AJOL)

    The position of this work is that all contingent beings have a causal agent. This position is taken as a result of trying to delve into the issue of contingency and causality of being which has been discussed by many philosophers of diverse epochs of philosophy. This work tries to participate in the debate of whether contingent ...

  8. Sustainability Criteria for Planning, Constructing, and Operating Contingency Bases

    Science.gov (United States)

    2012-05-22

    common PREREQ 1 Walkable Streets yes Planning, Desi gn, Construction, OaM Medium use areas. Plan careft,j!y to accommodate simftar functions in the...apjly the specific LEED·ND criteria. Pay special attention to roads that connect LSA ~ife support areas) to common Walkable Streets yes Planning... Walkable Streets  Intent: ►To promote transportation efficiency. ►To promote walking by providing: • Safe •Appealing •Comfortable street

  9. Big Pylons: Mixed signals for transmission. Spatial planning for energy distribution

    International Nuclear Information System (INIS)

    Ritchie, Heather; Hardy, Maelíosa; Lloyd, M. Greg; McGreal, Stanley

    2013-01-01

    The effective delivery of a sustainable energy future raises many challenges in relation to energy distribution where a new understanding of spatial planning is needed in relation to energy production, consumption and storage. Understanding the emergent low carbon energy economy in terms of its production, distribution and consumption characteristics has prompted a deliberate spatial planning interest. This paper examines issues relating to spatial planning, regulation, political legitimacy and accountability in the current and future systems for energy distribution. In particular it examines the Beauly Denny public inquiry in Scotland as a case study in terms of demonstrating the changing state–market–civil relations in an energy transition context with differentiated values and interests. The case study highlights implications for the regulation in the public interest of highly contested spaces, places and development schemes, together with a synopsis of government structure and change that is influencing the future of spatial planning and energy distribution in particular. - Highlights: • We examine links between spatial planning and regulation of energy distribution. • We examine the Beauly Denny public inquiry in Scotland. • We highlight challenges surrounding the development of a resilient energy system. • We highlight links between spatial planning and infrastructural development

  10. On Korean strategy and plan for fusion energy

    International Nuclear Information System (INIS)

    Kim, H.J.; Choi, W-J.; Park, C.; Kim, H.C.

    2012-01-01

    In developing KSTAR (Korean Superconducting Tokamak Advanced Research), Korea had initiated a mid-entry strategy to catch up with the technologies required for the development of a fusion reactor, based on the tokamak magnetic confinement concept. Upon joining ITER (International Thermonuclear Experimental Reactor), Korean government enacted a promotional law for the fusion energy development. Under this promotional law the national promotional plans for developing fusion energy have been established. The National Fusion Research Institute (NFRI) developed the strategy and plan for a fusion DEMO program to realize the magnetic fusion energy. (author)

  11. On Korean strategy and plan for fusion energy

    Energy Technology Data Exchange (ETDEWEB)

    Kim, H.J. [National Fusion Research Inst., Daejeon (Korea, Republic of); Choi, W-J. [Chungnam National Univ., Daejeon (Korea, Republic of); Park, C. [POSTECH, Pohang (Korea, Republic of); Kim, H.C. [National Fusion Research Inst., Daejeon (Korea, Republic of)

    2012-07-01

    In developing KSTAR (Korean Superconducting Tokamak Advanced Research), Korea had initiated a mid-entry strategy to catch up with the technologies required for the development of a fusion reactor, based on the tokamak magnetic confinement concept. Upon joining ITER (International Thermonuclear Experimental Reactor), Korean government enacted a promotional law for the fusion energy development. Under this promotional law the national promotional plans for developing fusion energy have been established. The National Fusion Research Institute (NFRI) developed the strategy and plan for a fusion DEMO program to realize the magnetic fusion energy. (author)

  12. EU Research and Innovation (R and I) in renewable energies: The role of the Strategic Energy Technology Plan (SET-Plan)

    Energy Technology Data Exchange (ETDEWEB)

    Hervas Soriano, Fernando [Joint Research Centre, Institute for Prospective Technological Studies, Edificio EXPO, c/ Inca Garcilaso 3, E-41092 Seville (Spain); Mulatero, Fulvio, E-mail: fulvio.mulatero@ec.europa.eu [Joint Research Centre, Institute for Prospective Technological Studies, Edificio EXPO, c/ Inca Garcilaso 3, E-41092 Seville (Spain)

    2011-06-15

    The SET-Plan established a strategy to use Research and Innovation (R and I) to green the EU energy sector while ensuring a secure supply and increasing EU competitiveness. The strategy sets clear objectives and programming plans and takes stock of existing initiatives in the energy sector, fosters a cooperative approach to R and I, introduces a high-level steering group (the SET-Plan Steering Group) to monitor progress, creates a dedicated information system (the SETIS) to fill the void in policy information and produces estimates of financial needs over the programming period. In this respect, the SET-Plan could serve as a blueprint for R and I strategies to tackle other societal challenges. To be effective, such strategies should further clarify the hierarchy of existing objectives and instruments, introduce specific instruments to pull the demand of new technologies, strengthen links with education and training policies and formalize links with the governance structures of existing initiatives. - Highlights: > This paper assesses the impact of the SET-Plan on EU renewable energy policy. > We analyze the degree of complementarity and duplication with existing initiatives. > We discuss the role of a new system of indicators (SETIS). > The analysis of financing reveals the existence of sizeable shortfalls. > Lessons for future similar initiatives are sketched.

  13. EU Research and Innovation (R and I) in renewable energies: The role of the Strategic Energy Technology Plan (SET-Plan)

    International Nuclear Information System (INIS)

    Hervas Soriano, Fernando; Mulatero, Fulvio

    2011-01-01

    The SET-Plan established a strategy to use Research and Innovation (R and I) to green the EU energy sector while ensuring a secure supply and increasing EU competitiveness. The strategy sets clear objectives and programming plans and takes stock of existing initiatives in the energy sector, fosters a cooperative approach to R and I, introduces a high-level steering group (the SET-Plan Steering Group) to monitor progress, creates a dedicated information system (the SETIS) to fill the void in policy information and produces estimates of financial needs over the programming period. In this respect, the SET-Plan could serve as a blueprint for R and I strategies to tackle other societal challenges. To be effective, such strategies should further clarify the hierarchy of existing objectives and instruments, introduce specific instruments to pull the demand of new technologies, strengthen links with education and training policies and formalize links with the governance structures of existing initiatives. - Highlights: → This paper assesses the impact of the SET-Plan on EU renewable energy policy. → We analyze the degree of complementarity and duplication with existing initiatives. → We discuss the role of a new system of indicators (SETIS). → The analysis of financing reveals the existence of sizeable shortfalls. → Lessons for future similar initiatives are sketched.

  14. Proposed business plan for energy efficiency in Brazil

    International Nuclear Information System (INIS)

    De Oliveira, Lilian Silva; Shayani, Rafael Amaral; De Oliveira, Marco Aurelio Gonçalves

    2013-01-01

    The Brazilian Ministry of Mines and Energy published the National Energy and Efficiency Plan, which calls for electricity savings of 10% by 2030. At first sight, the projected goal does not seem too ambitious, but this figure is nearly eighteen times the known historical savings for the country. Adjustments need to be made to the current energy efficiency business plan. This article suggests what should be changed in order to make the program more attractive and effective. These include changes on its organizational structure, legislation, verification of results and transparency. The new plan aims to eliminate some existing barriers and introduce new mechanisms that should help the country meet its future goals. - Highlights: • Brazil's successful efficiency program was presented, including the government's goal to increase the savings 25 times until 2030. • To achieve this huge goal, the national energy efficiency program needs a new approach, including new institutional arrangements. • These arrangements proposals are the useful contribution from this paper

  15. 25 CFR 39.503 - How can a school use contingency funds?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How can a school use contingency funds? 39.503 Section 39.503 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contingency Fund § 39.503 How can a school use contingency funds? Contingency funds can be...

  16. Energy audit role in building planning

    Science.gov (United States)

    Sipahutar, Riman; Bizzy, Irwin

    2017-11-01

    An energy audit is one way to overcome the excessive use of energy in buildings. The increasing growth of population, economy, and industry will have an impact on energy demand and the formation of greenhouse gas emissions. Indonesian National Standard (SNI) concerning the building has not been implemented optimally due to the socialization process by a government not yet been conducted. An energy audit of buildings has been carried out at offices and public services. Most electrical energy in buildings used for air refresher equipment or air conditioning. Calculation of OTTV has demonstrated the importance of performing since the beginning of the planning of a building to get energy-efficient buildings.

  17. Estimating state-contingent production functions

    DEFF Research Database (Denmark)

    Rasmussen, Svend; Karantininis, Kostas

    The paper reviews the empirical problem of estimating state-contingent production functions. The major problem is that states of nature may not be registered and/or that the number of observation per state is low. Monte Carlo simulation is used to generate an artificial, uncertain production...... environment based on Cobb Douglas production functions with state-contingent parameters. The pa-rameters are subsequently estimated based on different sizes of samples using Generalized Least Squares and Generalized Maximum Entropy and the results are compared. It is concluded that Maximum Entropy may...

  18. 78 FR 46781 - Federal Acquisition Regulation; Definition of Contingency Operation

    Science.gov (United States)

    2013-08-01

    ... Federal Acquisition Regulation; Definition of Contingency Operation AGENCY: Department of Defense (DoD... the Federal Acquisition Regulation (FAR) to revise the definition of ``contingency operation'' to... ``contingency operation'' at FAR 2.101 in accordance with the statutory change to the definition made by...

  19. The double-contingency principle: An historical perspective

    International Nuclear Information System (INIS)

    Knief, R.A.

    1995-01-01

    Standard ANSI/ANS-8.1 states the double contingency principle as: Process designs should, in general, incorporate sufficient factors of safety to require at least two unlikely, independent, and concurrent changes in process conditions before a criticality accident is possible. This paper presents a perspective on the double contingency principle

  20. Yerington Paiute Tribe Energy Plan Version 1

    Energy Technology Data Exchange (ETDEWEB)

    Consulting, BB9 [BB9 Consulting; Director, Environmental

    2014-04-01

    The Yerington Paiute Tribe has made energy management and planning a priority. The Tribal Council has recognized that energy is an important component of their goal of self-sufficiency. Recognizing energy development as a component of the Tribe’s natural resources provides for needed economic development.A number of priorities have been identified for energy development. These range from immediate housing needs such as weatherization and solar to interest in energy as economic development.

  1. Design and Implementation of Regional and Communal Energy Plans

    International Nuclear Information System (INIS)

    Jilek, W.

    1997-01-01

    Local energy planning has become a common thing, particularly after the first oil shock in the year 1973. This kind of planning claims to follow an integrated approach, i.e. to treat not only the economic problems connected with the supply of energy, but also the environmental problems concerned and the questions related to the conservation of resources. In Styria, such ''integrated'' plans have emerged in more than 25 municipalities, so far. Most of these concepts - harmonized with the clearly defined goals and objectives of the province's energy and environmental policy - may be termed a success insofar, as the measures considered therein are already in the process of practical implementation. (author)

  2. Commonwealth of the Northern Mariana Islands Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.

  3. Long term planning for wind energy development

    International Nuclear Information System (INIS)

    Trinick, M.

    1995-01-01

    In a planning system intended to be governed primarily by policies in statutory plans a reasonable horizon for long term planning is 10 years or longer. Because of statutory requirements, developers have no option but to pay due regard to, and take a full part in, long term planning. The paper examines the type of policies which have emerged in the last few years to cater for wind energy development. It canvasses the merits of different types of policies. Finally, it discusses the policy framework which may emerge to cater for development outside NFFO. (Author)

  4. Contingency Management with Human Autonomy Teaming

    Science.gov (United States)

    Shively, Robert J.; Lachter, Joel B.

    2018-01-01

    Automation is playing an increasingly important role in many operations. It is often cheaper faster and more precise than human operators. However, automation is not perfect. There are many situations in which a human operator must step in. We refer to these instances as contingencies and the act of stepping in contingency management. Here we propose coupling Human Autonomy Teaming (HAT) with contingency management. We describe two aspects to HAT, bi-directional communication, and working agreements (or plays). Bi-directional communication like Crew Resource Management in traditional aviation, allows all parties to contribute to a decision. Working agreements specify roles and responsibilities. Importantly working agreements allow for the possibility of roles and responsibilities changing depending on environmental factors (e.g., situations the automation was not designed for, workload, risk, or trust). This allows for the automation to "automatically" become more autonomous as it becomes more trusted and/or it is updated to deal with a more complete set of possible situations. We present a concrete example using a prototype contingency management station one might find in a future airline operations center. Automation proposes reroutes for aircraft that encounter bad weather or are forced to divert for environmental or systems reasons. If specific conditions are met, these recommendations may be autonomously datalinked to the affected aircraft.

  5. Management issues regarding the contingent workforce

    Energy Technology Data Exchange (ETDEWEB)

    Bowen-Smed, S. [Bowen Workforce Solutions, Calgary, AB (Canada)

    2004-07-01

    Fifty per cent of corporate leaders in Calgary today will be eligible for retirement over the next 5 years. In addition, 53 per cent of the entire Calgary workforce is 45 years or older. This paper suggests that only companies that seek aggressive programs to engage immigrants and contractors will weather the skills shortages anticipated in the future. It was noted that contractors care about aligning values to organizations, regardless of the project length, and that professional development is a key consideration when it comes to selecting their next project. Contingent workforce issues include: effectiveness; classification; risk; and cost. It was stated that effectiveness of the contingent workforce is an employer's responsibility. Factors that would strengthen the relationship between corporations and contractors include: proper orientation to manage expectations; training to improve productivity; tracking to enhance the quality of the workforce; and a management process to ensure adherence to protocol. It was concluded that the contingent workforce is an essential component to human capital management strategy, but that key issues must be managed to avoid unnecessary costs. In addition, effectiveness improves when processes are implemented. It was also suggested that technology is an essential component of the solution. Outsourcing is an effective approach to managing the contingent workforce. tabs., figs.

  6. Approach and practices of district energy planning to achieve low carbon outcomes in China

    International Nuclear Information System (INIS)

    Xu, Baoping; Zhou, Shaoxiang; Hao, Lin

    2015-01-01

    District energy planning is an important methodology to assist in realizing a lower carbon target. However, district energy planning has not yet been incorporated into the statutory planning system in China, primarily because there are no clear standards and specifications for these plans. In this paper, we propose a general framework and low carbon estimation method for district energy planning, which is based on evaluating the low carbon energy planning practices of several new districts in China. In addition, several key points of concern in the planning process are extracted and discussed: overall infrastructure planning; co-operation between city planning and other special low carbon eco-planning; investment, financing and profitable operation; planning management mechanisms; and the management of the construction of the energy system to coincide with the project schedule. We carried out a case study of a low carbon energy plan for a new district of Beijing to evaluate our framework. Finally, we conclude that to realize the low carbon target, regional energy planning covering technologies, the market and management should be standardized as soon as possible. -- Highlights: •A general framework for district energy planning is proposed. •A case study of a low carbon energy plan for a new district is carried out. •District energy planning should be standardized as soon as possible. •The most suitable spatial scale for energy planning is at the municipal level

  7. Framework for reports on urban energy planning in 6 case cities

    DEFF Research Database (Denmark)

    Fertner, Christian; Groth, Niels Boje; Große, Juliane

    a general model for energy efficiency and sustainable city planning. By connecting scientific excellence and innovative enterprises in the energy sector with ambitious and well-organized cities, the project aims to reduce energy use in Europe in the near future and will therefore be an important tool...... on the case study reports (D4.2). The wider target group are other PLEEC partners who are interested in WP4’s work as well as other professionals who would like to get inspiration how to conduct an analysis of energy issues in relation to spatial planning and urban form in medium-sized cities. Five main...... chapters are suggested to follow in all case study reports: • Overview of city (geography, socio-economic, history, …) • Historical urban development and spatial planning development • Evolution of national and local energy planning • Management of urban planning and energy today • Pilot projects / good...

  8. Sound-contingent visual motion aftereffect

    Directory of Open Access Journals (Sweden)

    Kobayashi Maori

    2011-05-01

    Full Text Available Abstract Background After a prolonged exposure to a paired presentation of different types of signals (e.g., color and motion, one of the signals (color becomes a driver for the other signal (motion. This phenomenon, which is known as contingent motion aftereffect, indicates that the brain can establish new neural representations even in the adult's brain. However, contingent motion aftereffect has been reported only in visual or auditory domain. Here, we demonstrate that a visual motion aftereffect can be contingent on a specific sound. Results Dynamic random dots moving in an alternating right or left direction were presented to the participants. Each direction of motion was accompanied by an auditory tone of a unique and specific frequency. After a 3-minutes exposure, the tones began to exert marked influence on the visual motion perception, and the percentage of dots required to trigger motion perception systematically changed depending on the tones. Furthermore, this effect lasted for at least 2 days. Conclusions These results indicate that a new neural representation can be rapidly established between auditory and visual modalities.

  9. 78 FR 13765 - Federal Acquisition Regulation; Definition of Contingency Operation

    Science.gov (United States)

    2013-02-28

    ... Federal Acquisition Regulation; Definition of Contingency Operation AGENCY: Department of Defense (DoD... Regulation (FAR) to revise the definition of ``contingency operation'' to address the statutory change to the... ``contingency operation'' at FAR 2.101 in accordance with the statutory change to the definition made by...

  10. Optimization of energy planning strategies in municipalities

    DEFF Research Database (Denmark)

    Petersen, Jens-Phillip

    approach, suffers from insufficient information, tools and resources. Municipalities are often unable to take on a steering role in community energy planning. To overcome these barriers and guide municipalities in the pre-project phase, a decision-support methodology, based on community energy profiles...

  11. Lac du Flambeau Band of Lake Superior Chippewa Indians Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bryan Hoover

    2009-11-16

    This plan discusses the current energy use on the Lac du Flambeau Reservation, the current status of the Tribe's energy program, as well as the issues and concerns with energy on the reservation. This plan also identifies and outlines energy opportunities, goals, and objectives for the Tribe to accomplish. The overall goal of this plan is to address the energy situation of the reservation in a holistic manner for the maximum benefit to the Tribe. This plan is an evolving document that will be re-evaluated as the Tribe's energy situation changes.

  12. Contingent Attentional Capture by Conceptually Relevant Images

    Science.gov (United States)

    Wyble, Brad; Folk, Charles; Potter, Mary C.

    2013-01-01

    Attentional capture is an unintentional shift of visuospatial attention to the location of a distractor that is either highly salient, or relevant to the current task set. The latter situation is referred to as contingent capture, in that the effect is contingent on a match between characteristics of the stimuli and the task-defined…

  13. Work plan, health and safety plan, and site characterization for the Rust Spoil Area (D-106)

    International Nuclear Information System (INIS)

    Bohrman, D.E.; Uziel, M.S.; Landguth, D.C.; Hawthorne, S.W.

    1990-06-01

    As part of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) of the Department of Energy's Y-12 Plant located in Oak Ridge, Tennessee, this work plan has been developed for the Rust Spoil Area (a solid waste disposal area). The work plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division (HASRD) at Oak Ridge National Laboratory (ORNL) and will be implemented jointly by ORNL/MAD and the Y-12 Environmental Surveillance Section. This plan consists of four major sections: (1) a project description giving the scope and objectives of the investigation at the Rust Spoil Area; (2) field and sampling procedures describing sample documentation, soil sampling techniques, sample packaging and preservation, equipment decontamination, and disposal of investigation generated wastes; (3) sample analysis procedures detailing necessary analytical laboratory procedures to ensure the quality of chemical results from sample receipt through analysis and data reporting; and (4) a health and safety plan which describes general site hazards and particular hazards associated with specific tasks, assigns responsibilities, establishes personnel protection standards and mandatory safety procedures, and provides emergency information for contingencies that may arise during the course of field operations

  14. U.S. Navy Energy Plan

    Science.gov (United States)

    1977-01-01

    plans) be assessed to determine environ- mental effects. If these assessments show "significant effect on the human environment," or are, in any way...specific energy conservation and management areas for review by the Inspector General of the Navy. (II) Act as Program and Resourec Sponsor for Navy

  15. The Effectiveness of Gaze-Contingent Control in Computer Games.

    Science.gov (United States)

    Orlov, Paul A; Apraksin, Nikolay

    2015-01-01

    Eye-tracking technology and gaze-contingent control in human-computer interaction have become an objective reality. This article reports on a series of eye-tracking experiments, in which we concentrated on one aspect of gaze-contingent interaction: Its effectiveness compared with mouse-based control in a computer strategy game. We propose a measure for evaluating the effectiveness of interaction based on "the time of recognition" the game unit. In this article, we use this measure to compare gaze- and mouse-contingent systems, and we present the analysis of the differences as a function of the number of game units. Our results indicate that performance of gaze-contingent interaction is typically higher than mouse manipulation in a visual searching task. When tested on 60 subjects, the results showed that the effectiveness of gaze-contingent systems over 1.5 times higher. In addition, we obtained that eye behavior stays quite stabile with or without mouse interaction. © The Author(s) 2015.

  16. An exploratory study of healthcare strategic planning in two metropolitan areas.

    Science.gov (United States)

    Begun, James W; Kaissi, Amer A

    2005-01-01

    Little is known about empirical variation in the extent to which healthcare organizations conduct formal strategic planning or the extent to which strategic planning affects performance. Structural contingency and complexity science theory offer differing interpretations of the value of strategic planning. Structural contingency theory emphasizes adaptation to achieve organizational fit with a changing environment and views strategic planning as a way to chart the organization's path. Complexity science argues that planning is largely futile in changing environments. Interviews of leaders in 20 healthcare organizations in the metropolitan areas of Minneapolis/St. Paul, Minnesota, and San Antonio, Texas, reveal that strategic planning is a common and valued function in healthcare organizations. Respondents emphasized the need to continuously update strategic plans, involve physicians and the governing board, and integrate strategic plans with other organizational plans. Most leaders expressed that strategic planning contributes to organizational focus, fosters stakeholder participation and commitment, and leads to achievement of strategic goals. Because the widespread belief in strategic planning is based largely on experience, intuition, and faith, we present recommendations for developing an evidence base for healthcare strategic planning.

  17. Electrophysiological brain indices of risk behavior modification induced by contingent feedback.

    Science.gov (United States)

    Megías, Alberto; Torres, Miguel Angel; Catena, Andrés; Cándido, Antonio; Maldonado, Antonio

    2018-02-01

    The main aim of this research was to study the effects of response feedback on risk behavior and the neural and cognitive mechanisms involved, as a function of the feedback contingency. Sixty drivers were randomly assigned to one of three feedback groups: contingent, non-contingent and no feedback. The participants' task consisted of braking or not when confronted with a set of risky driving situations, while their electroencephalographic activity was continuously recorded. We observed that contingent feedback, as opposed to non-contingent feedback, promoted changes in the response bias towards safer decisions. This behavioral modification implied a higher demand on cognitive control, reflected in a larger amplitude of the N400 component. Moreover, the contingent feedback, being predictable and entailing more informative value, gave rise to smaller SPN and larger FRN scores when compared with non-contingent feedback. Taken together, these findings provide a new and complex insight into the neurophysiological basis of the influence of feedback contingency on the processing of decision-making under risk. We suggest that response feedback, when contingent upon the risky behavior, appears to improve the functionality of the brain mechanisms involved in decision-making and can be a powerful tool for reducing the tendency to choose risky options in risk-prone individuals. Copyright © 2018 Elsevier B.V. All rights reserved.

  18. Skype me! Socially Contingent Interactions Help Toddlers Learn Language

    OpenAIRE

    Roseberry, Sarah; Hirsh-Pasek, Kathy; Golinkoff, Roberta Michnick

    2013-01-01

    Language learning takes place in the context of social interactions, yet the mechanisms that render social interactions useful for learning language remain unclear. This paper focuses on whether social contingency might support word learning. Toddlers aged 24- to 30-months (N=36) were exposed to novel verbs in one of three conditions: live interaction training, socially contingent video training over video chat, and non-contingent video training (yoked video). Results sugges...

  19. Continental energy plan. Canadian perspectives

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The 'continental energy plan' was first mentioned by US President George Bush during his election campaign, and relates to the adjustment of energy resources development in Canada and Mexico. The US energy policy aims to reduce US dependence on middle east oil supplies, increase US energy production, increase regional integration of energy supplies throughout North America, increase US refining capacity, reduce regulatory barriers, increase use of alternative energies, and to increase support for research and development. Under the Canada/US FTA (Free Trade Agreement) and NAFTA (North American Free Trade Agreement), not less than 50% of Canadian crude oil and natural gas are imported to the US market. As for Mexico, it exempted most portions of its energy sector from the agreement during the NAFTA negotiations. Now that Mexico itself is facing energy shortage, however, it is anticipated that under President Vincente Fox it will adopt a policy like that of Canada and start development by introducing foreign money into the fields of oil, gas, and electricity. (NEDO)

  20. Designing an energy planning concept for enhancing the dissemination of renewable energy technologies in developing countries

    DEFF Research Database (Denmark)

    Lybæk, Rikke; Andersen, Jan; Lund, Søren

    2014-01-01

    This paper stresses the need for adapting a sustainable energy planning concept, which can support the implementation of renewable energy in developing countries; exemplified by a Vietnamese case. Many developing countries heavily rely on fossil fuel resources and will face energy supply security...... countries, while relevant policies, tools and plans etc. simultaneously are being deployed, enhancing the framework conditions for renewable energy implementation...

  1. A multi-objective approach for developing national energy efficiency plans

    International Nuclear Information System (INIS)

    Haydt, Gustavo; Leal, Vítor; Dias, Luís

    2014-01-01

    This paper proposes a new approach to deal with the problem of building national energy efficiency (EE) plans, considering multiple objectives instead of only energy savings. The objectives considered are minimizing the influence of energy use on climate change, minimizing the financial risk from the investment, maximizing the security of energy supply, minimizing investment costs, minimizing the impacts of building new power plants and transmission infrastructures, and maximizing the local air quality. These were identified through literature review and interaction with real decision makers. A database of measures is established, from which millions of potential EE plans can be built by combining measures and their respective degree of implementation. Finally, a hybrid multi-objective and multi-criteria decision analysis (MCDA) model is proposed to search and select the EE plans that best match the decision makers’ preferences. An illustration of the working mode and the type of results obtained from this novel hybrid model is provided through an application to Portugal. For each of five decision perspectives a wide range of potential best plans were identified. These wide ranges show the relevance of introducing multi-objective analysis in a comprehensive search space as a tool to inform decisions about national EE plans. - Highlights: • A multiple objective approach to aid the choice of national energy efficiency plans. • A hybrid multi-objective MCDA model is proposed to search among the possible plans. • The model identified relevant plans according to five different idealized DMs. • The approach is tested with Portugal

  2. The Role of Nuclear Energy for Long-term National Energy Planning

    International Nuclear Information System (INIS)

    Soetrisnanto, Arnold Y; Adiwardojo; Soentono, Soedyartomo

    2001-01-01

    Energy planning development is a part of the sustainable development that supports the attainment of national development goals. The objective of the study is to support the national planning and decision-making process in the energy and electric sector in Indonesia with nuclear option for period of 1997- 2027. This study performs the provision of detailed economic sector and regional energy demand projection by MAED simulation model based on the economic and population scenarios. Then continued with the optimization of the future energy supply such as electricity supply taking all known Indonesian energy sources and all relevant technologies into consideration by MARKAL Model. The result shows that Indonesia's need for final energy is forecasted to increase two times, from 4,028.4 PJ at the beginning of study become 8,145.6 PJ at the end of study. The more the use of fossil fuels are tightened and enforced because of its environmental impact, the earlier the nuclear power becomes part of the optimum generation mix. In the case IEA1001 (reduction of 1% CO 2 emission), nuclear energy is needed in Jawa-Bali region in the earliest possibility i.e. year 2018 corresponding to 0.37 GW and it will increase in the next years

  3. 1989 basic plan for atomic energy development and utilization

    International Nuclear Information System (INIS)

    1989-01-01

    A Basic Plan for Atomic Energy Development and Utilization has been established each year based on the guidelines set up by the Atomic Energy Commission of Japan, with the aim of promoting the development and utilization of atomic energy schematically and efficiently. The Basic Plan shows specific projects to achieve the objectives specified in the Long-Range Plan for Atomic Energy Development and Utilization. The Basic Plan specifies efforts to be made for overall strengthening of safety measures (safety policies, safety research, disaster prevention, etc.), promotion of nuclear power generation, establishment of the nuclear fuel cycle (securing of uranium, technology for uranium enrichment, reprocessing, etc.), development of new types of power reactors (fast breeder reactor, new types of converter reactors, plutonium fuel processing technology), promotion of leading projects (nuclear fusion, utilization of radiations, atomic powered ships, high-temperature engineering tests), promotion of basic technology development (basic research, training of scientists and engineers), voluntary and active international activities (international cooperation), and acquisition of understanding and cooperation of the general public. (N,K.)

  4. MATERNAL ANXIETY SYMPTOMS AND MOTHER–INFANT SELF- AND INTERACTIVE CONTINGENCY

    Science.gov (United States)

    Beebe, Beatrice; Steele, Miriam; Jaffe, Joseph; Buck, Karen A.; Chen, Henian; Cohen, Patricia; Kaitz, Marsha; Markese, Sara; Andrews, Howard; Margolis, Amy; Feldstein, Stanley

    2014-01-01

    Associations of maternal self-report anxiety-related symptoms with mother–infant 4-month face-to-face play were investigated in 119 pairs. Attention, affect, spatial orientation, and touch were coded from split-screen videotape on a 1-s time base. Self- and interactive contingency were assessed by time-series methods. Because anxiety symptoms signal emotional dysregulation, we expected to find atypical patterns of mother–infant interactive contingencies, and of degree of stability/lability within an individual’s own rhythms of behavior (self-contingencies). Consistent with our optimum midrange model, maternal anxiety-related symptoms biased the interaction toward interactive contingencies that were both heightened (vigilant) in some modalities and lowered (withdrawn) in others; both may be efforts to adapt to stress. Infant self-contingency was lowered (“destabilized”) with maternal anxiety symptoms; however, maternal self-contingency was both lowered in some modalities and heightened (overly stable) in others. Interactive contingency patterns were characterized by intermodal discrepancies, confusing forms of communication. For example, mothers vigilantly monitored infants visually, but withdrew from contingently coordinating with infants emotionally, as if mothers were “looking through” them. This picture fits descriptions of mothers with anxiety symptoms as overaroused/fearful, leading to vigilance, but dealing with their fear through emotional distancing. Infants heightened facial affect coordination (vigilance), but dampened vocal affect coordination (withdrawal), with mother’s face—a pattern of conflict. The maternal and infant patterns together generated a mutual ambivalence. PMID:25983359

  5. The Impact of the Contingency of Robot Feedback for HRI

    DEFF Research Database (Denmark)

    Fischer, Kerstin; Lohan, Katrin Solveig; Saunders, Joe

    2013-01-01

    robot iCub on a set of shapes and on a stacking task in two conditions, once with socially contingent, nonverbal feedback implemented in response to different gaze and looming behaviors of the human tutor, and once with non-contingent, saliency-based feedback. The results of the analysis of participants......’ linguistic behaviors in the two conditions show that contingency has an impact on the complexity and the pre-structuring of the task for the robot, i.e. on the participants’ tutoring behaviors. Contingency thus plays a considerable role for learning by demonstration....

  6. American Samoa: Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ness, J. Erik [National Renewable Energy Lab. (NREL), Golden, CO (United States); Haase, Scott [National Renewable Energy Lab. (NREL), Golden, CO (United States); Conrad, Misty [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    This document outlines actions being taken to reduce American Samoa's petroleum consumption. It describes the four near-term strategies selected by the American Samoa Renewable Energy Committee during action-planning workshops conducted in May 2016, and describes the steps that will need to be taken to implement those strategies.

  7. Lost in transmission : a comprehensive critique of the BC energy plan

    International Nuclear Information System (INIS)

    Shaffer, M.; Hove, J.; Yamashita, J.

    2007-06-01

    This document presented an independent critique and review of the British Columbia (BC) 2007 energy plan. The critique focused on BC hydro-related policies in the energy plan, and was presented in three policy papers. The first paper addressed self-sufficiency and insurance issues. It examined the need for new sources of electricity supply in terms of imports and other market purchases that are currently used to meet BC Hydro's requirements. The second paper addressed BC Hydro electricity rates and the impacts and costs of buying high and selling low. It identified the impacts and costs of the low electricity rate policy in the energy plan, a policy that would inflate the demand for electricity and exaggerate the need for new sources of power caused by the self-sufficiency and insurance policies in the energy plan. Specifically, the second paper discussed BC Hydro rates under the energy plan, the limitations of power smart programs, distributional issues and alternative strategy. The third paper addressed supply issues in the energy plan, with particular reference to targeting low value/high cost resources. It focused on the types of resources BC Hydro had to acquire. It specifically addressed the pressure to acquire run-of-river and wind energy which, despite their superficial appeal, are low in value and high in cost, and could have significant environmental impact. It was concluded that despite the attempt to address environmental concerns, the province's energy plan is designed to artificially increase the market for new independent power producer supply. 76 refs., 9 tabs., 4 figs

  8. Decision support tools for urban contingency policy: a scenario approach to risk management of the Vesuvio area in Naples, Italy

    NARCIS (Netherlands)

    Concilio, Grazia; Torrieri, Francesca

    2001-01-01

    Contingency management, in particular the management of unanticipated events outside the control of an ordinary planning system, has in the last 50years become an important andfrequently debated issue in the scientific literature on complex systems management underrisk conditions. The urban system

  9. Sustainable urban energy planning: A strategic approach to meeting climate and energy goals

    Energy Technology Data Exchange (ETDEWEB)

    Dobriansky, Larisa

    2010-09-15

    Meeting our 21st century challenges will require sustainable energy planning by our cities, where over half of the population resides. This already has become evident in the State of California, which has set rigorous greenhouse gas emission reduction targets and timeframes. To attain these targets will necessitate technically-integrated and cost-optimum solutions for innovative asset development and management within urban communities. Using California as a case study, this paper focuses on the crucial role for sustainable energy planning in creating the context and conditions for integrating and optimizing clean and efficient energy use with the urban built environment and infrastructure.

  10. Energy and nuclear power planning study for Algeria

    International Nuclear Information System (INIS)

    1985-01-01

    This study, conducted jointly by a team of engineers and economists from the Sonelgaz company and the IAEA, had three objectives: (1) To perform a preliminary economic study aimed at initiating thinking on the role that nuclear power could play in Algeria's long-term energy structure and to suggest reasonable hypotheses on what share of the energy market nuclear power might supply. (2) To train a team of Algerian engineers and economists in long-term economic planning techniques. Once the team has gained a basic knowledge through this preliminary study, it will be in a position to continue the process, to perform other, more detailed independent analyses and to review the entire process should economic conditions change. (3) To introduce in Algeria the computer techniques and facilities needed to carry out such energy investment planning studies for electricity production. The main aim throughout the studies was to train a team of Algerian engineers in energy planning rather than to come to definitive conclusions on the problem of introducing nuclear power in Algeria. Two successive analyses were performed. The first consisted in evaluating the final energy requirements which will result in the medium and long term (by 2015) from the implementation of the economic development policies in the Five Year Plan (up to 1984) and in the proposals for the next decade (up to 1990) being studied by the Algerian Ministry of Planning. The second part is concerned only with the results regarding future electricity requirements, which are used as input data in studying the optimization of Algeria's future electricity generating system. Various methods of generation are analysed and included in an econometric model in order to make a sequential determination of the most economic composition of power generating capacity

  11. Energy conservation and management plan for plant facilities at the Livermore site

    Energy Technology Data Exchange (ETDEWEB)

    Ng, W.; Szybalski, S.; Kerr, W. H.; Meyer, H. J.

    1976-03-15

    An energy conservation and management plan for the Livermore site of the Lawrence Livermore Laboratory is presented. The plan defines the energy-conservation goals for the next 10 years and proposes the ways and means of attaining them. The main features contained in this plan are as follows: development of the criteria and underlying assumptions required for long range planning, including energy growth rates and the case for using the concept of the technical-fix energy growth rate, LLL energy outlook and fuel cost projections, and life-cycle-cost criteria; targets of the long-range plan include between 1975 and 1985, an annual energy usage growth equal to 5.8 percent of the 1975 energy consumption, 1985 and thereafter, zero energy growth, a change from the current dependence on natural gas to the use of other fuels for heating, and a doubling of the 30-day strategic oil storage capacity; and cost schedule for the next 10 years.

  12. Renewable Energy Zone (REZ) Transmission Planning Process: A Guidebook for Practitioners

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Nathan [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Flores-Espino, Francisco [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hurlbut, David J. [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-05

    Achieving clean energy goals may require new investments in transmission, especially if planners anticipate economic growth and increased demand for electricity. The renewable energy zone (REZ) transmission planning process can help policymakers ensure their infrastructure investments achieve national goals in the most economical manner. Policymakers, planners, and system operators around the world have used variations of the REZ process to chart the expansion of their transmission networks and overcome the barriers of traditional transmission planning. This guidebook seeks to help power system planners, key decision makers, and stakeholders understand and use the REZ transmission planning process to integrate transmission expansion planning and renewable energy generation planning.

  13. Hopi Sustainable Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Norman Honie, Jr.; Margie Schaff; Mark Hannifan

    2004-08-01

    The Hopi Tribal Government as part of an initiative to ?Regulate the delivery of energy and energy services to the Hopi Reservation and to create a strategic business plan for tribal provision of appropriate utility, both in a manner that improves the reliability and cost efficiency of such services,? established the Hopi Clean Air Partnership Project (HCAPP) to support the Tribe?s economic development goals, which is sensitive to the needs and ways of the Hopi people. The Department of Energy (DOE) funded, Formation of Hopi Sustainable Energy Program results are included in the Clean Air Partnership Report. One of the Hopi Tribe?s primary strategies to improving the reliability and cost efficiency of energy services on the Reservation and to creating alternative (to coal) economic development opportunities is to form and begin implementation of the Hopi Sustainable Energy Program. The Hopi Tribe through the implementation of this grant identified various economic opportunities available from renewable energy resources. However, in order to take advantage of those opportunities, capacity building of tribal staff is essential in order for the Tribe to develop and manage its renewable energy resources. As Arizona public utilities such as APS?s renewable energy portfolio increases the demand for renewable power will increase. The Hopi Tribe would be in a good position to provide a percentage of the power through wind energy. It is equally important that the Hopi Tribe begin a dialogue with APS and NTUA to purchase the 69Kv transmission on Hopi and begin looking into financing options to purchase the line.

  14. Are the electric plans following the Brazilian energy policy?

    International Nuclear Information System (INIS)

    Metri, Paulo

    2013-01-01

    The first article of Brazilian law 9.478, enacted in 1997, provides the main objectives for the country's energy policy. After this law came into force, all public and private investments bringing about increase in energy offers should comply with these objectives. The 1990's saw privatizations of major distribution companies as well as of some generation companies, stretching even into the 2000's. At the same time, the basic rules for the electric sector were also modified. The Government maintained its planning role in this sector. Law 10.847, enacted in 2004, sets forth the guidelines for the electric sector's activities. Since then, many rounds of bids have been conducted in order to meet increasing needs of generation and transmission. Now, almost ten years after the introduction of the new rules, some electric-generating plants and transmission lines have been built or are under construction. There is doubt whether these rounds will suffice in satisfying the original goals. Today, nuclear energy is produced exclusively by the State, and it seems that it will remain so for years to come. It is usual to hear that the nuclear energy does not participate in the natural competition existing in the planning stage, because this source is a State imposition. Nuclear plants are built in a pace that guarantees the maintenance of nuclear technology in the country. But nuclear energy has not been banned from electric planning. This planning must encompass all possible judgment criteria, so that the positive aspects of nuclear energy may also stand out. In this way, the objectives established by Law 9,478 may not comprise best judgment criteria. If the planning shows nuclear energy as an attractive alternative, it should not then be adopted as an obligation. (author)

  15. Data for Renewable Energy Planning, Policy, and Investment

    Energy Technology Data Exchange (ETDEWEB)

    Cox, Sarah L [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-10-17

    Reliable, robust, and validated data are critical for informed planning, policy development, and investment in the clean energy sector. The Renewable Energy (RE) Explorer was developed to support data-driven renewable energy analysis that can inform key renewable energy decisions globally. This document presents the types of geospatial and other data at the core of renewable energy analysis and decision making. Individual data sets used to inform decisions vary in relation to spatial and temporal resolution, quality, and overall usefulness. From Data to Decisions, a complementary geospatial data and analysis decision guide, provides an in-depth view of these and other considerations to enable data-driven planning, policymaking, and investment. Data support a wide variety of renewable energy analyses and decisions, including technical and economic potential assessment, renewable energy zone analysis, grid integration, risk and resiliency identification, electrification, and distributed solar photovoltaic potential. This fact sheet provides information on the types of data that are important for renewable energy decision making using the RE Data Explorer or similar types of geospatial analysis tools.

  16. Does contingency in adults' responding influence 12-month-old infants' social referencing?

    Science.gov (United States)

    Stenberg, Gunilla

    2017-11-01

    In two experiments we examined the influence of contingent versus non-contingent responding on infant social referencing behavior. EXPERIMENT 1: Forty 12-month-old infants were exposed to an ambiguous toy in a social referencing situation. In one condition an unfamiliar adult who in a previous play situation had responded contingently to the infant's looks gave the infant positive information about the toy. In the other condition an unfamiliar adult who previously had not responded contingently delivered the positive information. EXPERIMENT 2: Forty-eight 12-month-old infants participated in Experiment 2. In this experiment it was examined whether the familiarity of the adult influences infants' reactions to contingency in responding. In one condition a parent who previously had responded contingently to the infant's looks provided positive information about the ambiguous toy, and in the other condition a parent who previously had not responded contingently provided the positive information. The infants looked more at the contingent experimenter in Experimenter 1, and also played more with the toy after receiving positive information from the contingent experimenter. No differences in looking at the parent and in playing with the toy were found in Experiment 2. The results indicate that contingency in responding, as well as the familiarity of the adult, influence infants' social referencing behavior. Copyright © 2017 Elsevier Inc. All rights reserved.

  17. 78 FR 55029 - Approval and Promulgation of Implementation; Texas; Houston: Reasonable Further Progress Plan...

    Science.gov (United States)

    2013-09-09

    ...): Transportation Control Measures and Transportation Control Strategies To Offset Growth in Emissions Due to Growth... progress (RFP) plan and contingency measures, the vehicle miles traveled (VMT) offset analysis, and... and Emission Reductions for RFP E. Contingency Measures F. Vehicle Miles Traveled Offset Analysis G...

  18. Contingency learning without awareness: evidence for implicit control.

    Science.gov (United States)

    Schmidt, James R; Crump, Matthew J C; Cheesman, Jim; Besner, Derek

    2007-06-01

    The results of four experiments provide evidence for controlled processing in the absence of awareness. Participants identified the colour of a neutral distracter word. Each of four words (e.g., MOVE) was presented in one of the four colours 75% of the time (Experiments 1 and 4) or 50% of the time (Experiments 2 and 3). Colour identification was faster when the words appeared in the colour they were most often presented in relative to when they appeared in another colour, even for participants who were subjectively unaware of any contingencies between the words and the colours. An analysis of sequence effects showed that participants who were unaware of the relation between distracter words and colours nonetheless controlled the impact of the word on performance depending on the nature of the previous trial. A block analysis of contingency-unaware participants revealed that contingencies were learned rapidly in the first block of trials. Experiment 3 showed that the contingency effect does not depend on the level of awareness, thus ruling out explicit strategy accounts. Finally, Experiment 4 showed that the contingency effect results from behavioural control and not from semantic association or stimulus familiarity. These results thus provide evidence for implicit control.

  19. The Contingent Value of Organizational Integration

    Directory of Open Access Journals (Sweden)

    Virpi Turkulainen

    2013-08-01

    Full Text Available We elaborate the link between organizational design and effectiveness by examining organizational integration and performance in the context of modern manufacturing. Through careful contextualization and empirical analysis of 266 manufacturing organizations in three industries and nine countries, we uncover a joint effect of integration and complexity on organizational effectiveness. The results extend structural contingency theory, in particular the mechanisms that link organizational integration to organizational effectiveness. We conclude by discussing the continuing relevance of structural contingency theory.

  20. Long term plan of atomic energy development and utilization

    International Nuclear Information System (INIS)

    1982-01-01

    The atomic energy utilization and development in Japan have progressed remarkably, and already nuclear power generation has borne an important part in electric power supply, while radiation has been utilized in the fields of industry, agriculture, medicine and so on. Now, atomic energy is indispensable for national life and industrial activity. The former long term plan was decided in September, 1978, and the new long term plan should be established since the situation has changed largely. The energy substituting for petroleum has been demanded, and the expectation to nuclear power generation has heightened because it enables stable and economical power supply. The independently developed technology related to atomic energy must be put in practical use. The peaceful utilization of atomic energy must be promoted, while contributing to the nuclear non-proliferation policy. The Atomic Energy Commission of Japan decided the new long term plan to clearly show the outline of the important measures related to atomic energy development and utilization in 10 years hereafter, and the method of its promotion. The basic concept of atomic energy development and utilization, the long term prospect and the concept on the promotion, the method of promoting the development and utilization, and the problems of funds, engineers and location are described. (kako, I.)

  1. Disaster and Contingency Planning for Scientific Shared Resource Cores.

    Science.gov (United States)

    Mische, Sheenah; Wilkerson, Amy

    2016-04-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores ("cores") to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution's overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy.

  2. Disaster and Contingency Planning for Scientific Shared Resource Cores

    Science.gov (United States)

    Wilkerson, Amy

    2016-01-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores (“cores”) to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution’s overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy. PMID:26848285

  3. Distinct changes in CREB phosphorylation in frontal cortex and striatum during contingent and non-contingent performance of a visual attention task

    Directory of Open Access Journals (Sweden)

    Mirjana eCarli

    2011-10-01

    Full Text Available The cyclic-AMP response element binding protein (CREB family of transcription factors has been implicated in numerous forms of behavioural plasticity. We investigated CREB phosphorylation along some nodes of corticostriatal circuitry such as frontal cortex (FC and dorsal (caudate putamen, CPu and ventral (nucleus accumbens, NAC striatum in response to the contingent or non-contingent performance of the five-choice serial reaction time task (5-CSRTT used to assess visuospatial attention. Three experimental manipulations were used; an attentional performance group (contingent, master, a group trained previously on the task but for whom the instrumental contingency coupling responding with stimulus detection and reward was abolished (non-contingent, yoked and a control group matched for food deprivation and exposure to the test apparatus (untrained. Rats trained on the 5-CSRTT (both master and yoked had higher levels of CREB protein in the FC, CPu and NAC compared to untrained controls. Despite the divergent behaviour of master and yoked rats CREB activity in the FC was not substantially different. In rats performing the 5-CSRTT (master, CREB activity was completely abolished in the CPu whereas in the NAC it remained unchanged. In contrast, CREB phosphorylation in CPu and NAC increased only when the contingency changed from goal-dependent to goal-independent reinforcement (yoked. The present results indicate that up-regulation of CREB protein expression across cortical and striatal regions possibly reflects the extensive instrumental learning and performance whereas increased CREB activity in striatal regions may signal the unexpected change in the relationship between instrumental action and reinforcement.

  4. Effectiveness evaluation of contingency sum as a risk management ...

    African Journals Online (AJOL)

    Ethiopian Journal of Environmental Studies and Management ... manage risks prone projects have adopted several methods, one of which is contingency sum. ... initial project cost, cost overrun and percentage allowed for contingency.

  5. Residential Energy Efficiency Research Planning Meeting Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2012-02-01

    This report summarizes key findings and outcomes from the U.S. Department of Energy's Building America Residential Energy Efficiency Research Planning meeting, held on October 28-29, 2011, in Washington, D.C.

  6. Development of school energy policy and energy education plans: A comparative case study in three Wisconsin school communities

    International Nuclear Information System (INIS)

    Lane, Jennie F.; Floress, Kristin; Rickert, Melissa

    2014-01-01

    Through a qualitative comparative case study, this investigation examined the process by which three school districts in Wisconsin, U.S.A., developed a school energy policy and complementary energy education plan. To guide the process, the researchers created an outline of recommended steps for the districts to follow. Although there were variations in the sequence and perceived ease of the steps, the Energy Task Force members involved in the process found the outline to be a supportive guide. Further analysis of the cases involved interviewing members of the Energy Task Forces to identify facilitating and obstructing factors. The study concluded that factors such as level of environmental literacy, along with aspects of the school culture and leadership, interacted to influence the successful drafting of school energy policies and education plans. In addition to introducing an outline of recommended steps that can be used by other school policy development teams interested in promoting energy efficiency, this study adds insights into the analysis of energy policy work within the context of a school setting. - Highlights: • School energy policy and complementary energy education plans can be successfully developed with guidelines for policy team membership. • Teacher agency, including environmental literacy, helps overcome barriers in developing school policy and energy education plans. • Administrative support of energy conservation is a key to the development of school energy policies and complementary energy education plans

  7. Y2K compliance readiness and contingency planning.

    Science.gov (United States)

    Stahl, S; Cohan, D

    1999-09-01

    As the millennium approaches, discussion of "Y2K compliance" will shift to discussion of "Y2K readiness." While "compliance" focuses on the technological functioning of one's own computers, "readiness" focuses on the operational planning required in a world of interdependence, in which the functionality of one's own computers is only part of the story. "Readiness" includes the ability to cope with potential Y2K failures of vendors, suppliers, staff, banks, utility companies, and others. Administrators must apply their traditional skills of analysis, inquiry and diligence to the manifold imaginable challenges which Y2K will thrust upon their facilities. The SPICE template can be used as a systematic tool to guide planning for this historic event.

  8. Collective proposal of Contingency Plan as an alternative for management risks to socioenvironmental disasters within Network Management Risk of Córrego Dantas (REGER-CD), Nova Friburgo, State of Rio de Janeiro, Brazil

    Science.gov (United States)

    Freitas, Leonardo; Luiza Coelho Netto, Ana

    2017-04-01

    An extreme rainfall event took place in the Mountainous Region of the state of Rio de Janeiro in January 2011, causing a catastrophic landslide that resulted in more than 900 deaths and 350 people disappearances. Precipitation events associated with landslides are common in this region and climate change tends to increase the frequency of intense rains and, consequently, landslides. At the same time, the vulnerability of communities has increased as a result of disorderly urban growth. Despite that, before 2011 communities and public power were not prepared to disaster management..After the 2011 event, public authorities try to established policies to reduce these vulnerabilities. One of the communities where the government acted was Córrego Dantas. However, the actions in this place were carried out in a top-down model, without discussion with population. As a consequence, the performance of public power has amplified social vulnerabilities. Highlight for the truculent removal of residents; resettlement in geographically isolated housing complexes; and the establishment of urbanization policies that go against the interests of the residents. The construction of the Córrego d'Aantas Disaster Risk Management Network (REGER-CD), including residents of affected communities, researchers, NGO members and representatives of the public power, is one way to respond these questions. Within this network, the construction of a proposal for a collective contingency plan, articulated with the municipal contingency plan, is generating residents' empowerment, greater adaptation to risks and reducing the vulnerability of Disasters and mass movements

  9. Strategic Energy Management Plan for the Santa Ynez Band of Chumash Indians

    Energy Technology Data Exchange (ETDEWEB)

    Davenport, Lars [Santa Ynez Band of Chumash Indians, Santa Ynez, CA (United States); Smythe, Louisa [Santa Ynez Band of Chumash Indians, Santa Ynez, CA (United States); Sarquilla, Lindsey [Santa Ynez Band of Chumash Indians, Santa Ynez, CA (United States); Ferguson, Kelly [Santa Ynez Band of Chumash Indians, Santa Ynez, CA (United States)

    2015-03-27

    This plan outlines the Santa Ynez Band of Chumash Indians’ comprehensive energy management strategy including an assessment of current practices, a commitment to improving energy performance and reducing overall energy use, and recommended actions to achieve these goals. Vision Statement The primary objective of the Strategic Energy Management Plan is to implement energy efficiency, energy security, conservation, education, and renewable energy projects that align with the economic goals and cultural values of the community to improve the health and welfare of the tribe. The intended outcomes of implementing the energy plan include job creation, capacity building, and reduced energy costs for tribal community members, and tribal operations. By encouraging energy independence and local power production the plan will promote self-sufficiency. Mission & Objectives The Strategic Energy Plan will provide information and suggestions to guide tribal decision-making and provide a foundation for effective management of energy resources within the Santa Ynez Band of Chumash Indians (SYBCI) community. The objectives of developing this plan include; Assess current energy demand and costs of all tribal enterprises, offices, and facilities; Provide a baseline assessment of the SYBCI’s energy resources so that future progress can be clearly and consistently measured, and current usage better understood; Project future energy demand; Establish a system for centralized, ongoing tracking and analysis of tribal energy data that is applicable across sectors, facilities, and activities; Develop a unifying vision that is consistent with the tribe’s long-term cultural, social, environmental, and economic goals; Identify and evaluate the potential of opportunities for development of long-term, cost effective energy sources, such as renewable energy, energy efficiency and conservation, and other feasible supply- and demand-side options; and Build the SYBCI’s capacity for

  10. Home energy rating system business plan feasibility study in Washington state

    Energy Technology Data Exchange (ETDEWEB)

    Lineham, T.

    1995-03-01

    In the Fall of 1993, the Washington State Energy Office funded the Washington Home Energy Rating System project to investigate the benefits of a Washington state HERS. WSEO established a HERS and EEM Advisory Group. Composed of mortgage lenders/brokers, realtors, builders, utility staff, remodelers, and other state agency representatives, the Advisory Group met for the first time on November 17, 1993. The Advisory Group established several subcommittees to identify issues and options. During its March 1994 meeting, the Advisory Group formed a consensus directing WSEO to develop a HERS business plan for consideration. The Advisory Group also established a business plan subcommittee to help draft the plan. Under the guidance of the business plan subcommittee, WSEO conducted research on how customers value energy efficiency in the housing market. This plan represents WSEO`s effort to comply with the Advisory Group`s request. Why is a HERS Business Plan necessary? Strictly speaking this plan is more of a feasibility plan than a business plan since it is designed to help determine the feasibility of a new business venture: a statewide home energy rating system. To make this determination decision makers or possible investors require strategic information about the proposed enterprise. Ideally, the plan should anticipate the significant questions parties may want to know. Among other things, this document should establish decision points for action.

  11. Contingent capture effects in temporal order judgments.

    Science.gov (United States)

    Born, Sabine; Kerzel, Dirk; Pratt, Jay

    2015-08-01

    The contingent attentional capture hypothesis proposes that visual stimuli that do not possess characteristics relevant for the current task will not capture attention, irrespective of their bottom-up saliency. Typically, contingent capture is tested in a spatial cuing paradigm, comparing manual reaction times (RTs) across different conditions. However, attention may act through several mechanisms and RTs may not be ideal to disentangle those different components. In 3 experiments, we examined whether color singleton cues provoke cuing effects in temporal order judgments (TOJs) and whether they would be contingent on attentional control sets. Experiment 1 showed that color singleton cues indeed produce cuing effects in TOJs, even in a cluttered and dynamic target display containing multiple heterogeneous distractors. In Experiment 2, consistent with contingent capture, we observed reliable cuing effects only when the singleton cue matched participants' current attentional control set. Experiment 3 suggests that a sensory interaction account of the differences found in Experiment 2 is unlikely. Our results help to discern the attentional components that may play a role in contingent capture. Further, we discuss a number of other effects (e.g., reversed cuing effects) that are found in RTs, but so far have not been reported in TOJs. Those differences suggest that RTs are influenced by a multitude of mechanisms; however, not all of these mechanisms may affect TOJs. We conclude by highlighting how the study of attentional capture in TOJs provides valuable insights for the attention literature, but also for studies concerned with the perceived timing between stimuli. (c) 2015 APA, all rights reserved).

  12. 25 CFR 39.502 - How does a school apply for contingency funds?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How does a school apply for contingency funds? 39.502... EQUALIZATION PROGRAM Contingency Fund § 39.502 How does a school apply for contingency funds? To apply for contingency funds, a school must send a request to the ELO. The ELO must send the request to the Director for...

  13. The detection of contingency and animacy from simple animations in the human brain.

    Science.gov (United States)

    Blakemore, S-J; Boyer, P; Pachot-Clouard, M; Meltzoff, A; Segebarth, C; Decety, J

    2003-08-01

    Contingencies between objects and people can be mechanical or intentional-social in nature. In this fMRI study we used simplified stimuli to investigate brain regions involved in the detection of mechanical and intentional contingencies. Using a factorial design we manipulated the 'animacy' and 'contingency' of stimulus movement, and the subject's attention to the contingencies. The detection of mechanical contingency between shapes whose movement was inanimate engaged the middle temporal gyrus and right intraparietal sulcus. The detection of intentional contingency between shapes whose movement was animate activated superior parietal networks bilaterally. These activations were unaffected by attention to contingency. Additional regions, the right middle frontal gyrus and left superior temporal sulcus, became activated by the animate-contingent stimuli when subjects specifically attended to the contingent nature of the stimuli. Our results help to clarify neural networks previously associated with 'theory of mind' and agency detection. In particular, the results suggest that low-level perception of agency in terms of objects reacting to other objects at a distance is processed by parietal networks. In contrast, the activation of brain regions traditionally associated with theory of mind tasks appears to require attention to be directed towards agency and contingency.

  14. Intermediate evaluation of USAID/Cairo energy policy planning project

    Energy Technology Data Exchange (ETDEWEB)

    Wilbanks, T.J.; Wright, S.B. (Oak Ridge National Lab., TN (United States)); Barron, W.F. (Hong Kong Univ. (Hong Kong)); Kamel, A.M. (Ain Shams Univ., Cairo (Egypt)); Santiago, H.T. (USDOE, Washington, DC (United States))

    1992-01-01

    Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an intermediate evaluation'' of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

  15. Intermediate evaluation of USAID/Cairo energy policy planning project

    Energy Technology Data Exchange (ETDEWEB)

    Wilbanks, T.J.; Wright, S.B. [Oak Ridge National Lab., TN (United States); Barron, W.F. [Hong Kong Univ. (Hong Kong); Kamel, A.M. [Ain Shams Univ., Cairo (Egypt); Santiago, H.T. [USDOE, Washington, DC (United States)

    1992-09-01

    Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an ``intermediate evaluation`` of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

  16. CW-FIT: Group Contingency Effects across the Day

    Science.gov (United States)

    Wills, Howard P.; Iwaszuk, Wendy M.; Kamps, Debra; Shumate, Emily

    2014-01-01

    This study explored the effects of a group-contingency intervention on student behavior across academic instructional periods. Research suggests group contingencies are evidence-based practices, yet calls for investigation to determine the best conditions and groups suited for this type of intervention. CW-FIT (Class-Wide Function-related…

  17. Plan to promote new energy introduction in Niigata Prefecture area; Niigataken chiiki shin energy donyu suishin keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The 'Plan to promote new energy introduction in Niigata Prefecture area' was established to leave the conditions that everybody can live with affluence and comfort in the next generation. The plan lasts for ten years until 2010. Upon identifying the district characteristics of Niigata Prefecture, and based on the results of investigations on new energy existence quantity, utilization possibility thereof, and consciousness of residents of the prefecture, considerations were given that the plan shows the basic policy to promote proliferation of the new energies, and serves as the guideline for practical implementation. The plan document is composed of the following four items: 1) the foreword, 2) the current status of energies, 3) new energies expected of introduction, and 4) basic measures. The energy consumption was estimated to increase to 1.345 times that of fiscal 1990 in the year 2010, the increase being mainly in consumer and household use. The targeted quantity for new energy introduction was set to 90,000 kl annually as converted to petroleum. Expected new energy applications would include photovoltaic power generation, snow energy and solar heat utilization, and cogeneration utilizing natural gas. (NEDO)

  18. Evaluation of Mexico's 1975-2000 energy plan

    International Nuclear Information System (INIS)

    Bazan-Perkins, Sergio D.; Fernandez-Zayas, Jose L.

    2008-01-01

    The certainty and trustworthiness of a planning model can best be assessed when projections can be compared with actual developments. The ability to design scenarios and to evaluate demographic, economic and technological change is also increased with periodic comparisons between plans and actual facts. In 1976, the Mexican government published a 25 year power supply plan for the country, in which a development of non-fossil fuel plants was recommended, largely due to environmental considerations. It was proposed that the new demand should be met mainly with renewable energy sources and nuclear power. The study stated that hydrocarbons would reach a peak between 2003 and 2005, and that after this point the descent of fuel consumption would proceed at an increased velocity. Under this program, the dependence of Mexico on fuel for electricity would be gradually reduced as the 21st century progressed. The suggestion was not assumed by successive governments, and fossil fuel plants took the place of the proposed nuclear plants. However, the original 25 years power plan has proved to be quite accurate in its social and economic previsions, and allows the validation of a new, more powerful and reliable planning model. This paper presents the results of the validation of the model, as well as major considerations to be heeded in the future to increase certainty in further planning efforts. The projection of a better, more sustainable and reliable energy future is also proposed

  19. Selection of projects in the regional energy planning

    International Nuclear Information System (INIS)

    Ramirez P, R.; Navas M, F.

    1993-01-01

    The processes of regional energy planning have changed vastly in the last years and it will continue changing in the future for the new norm of the State. This work tries to show the use of systematic tools in the selection of regional energy projects. It discusses a methodology of selection of projects based on a multivariate technical. It is applied in the Southwestern region of Colombia and both selection and priority results are obtained. The designed methodology allows to make the selection of projects in an automatic way with a software designed for such an end. In the case of Southwestern it arrives to a briefcase of projects for an energy plan and made for other races

  20. A Critical Review on the National Energy Efficiency Action Plan of Egypt.

    Directory of Open Access Journals (Sweden)

    Hatem Elrefaei

    2014-03-01

    Full Text Available Egypt, as with other developing countries, faces a major energy security problem, which strongly impacts all national plans for economic development. A sound energy strategy is crucially needed, and should be based on two pillars: first, boosting the production of clean energy from various renewable and non-renewable sources, and second, managing and rationalizing energy demand, with related reforms. Some steps were taken by previous Egyptian governments regarding these two pillars. In February 2008, the Ministry of Electricity and Energy of Egypt put a target of 20% of electricity to come from renewable energy resources by 2020. In July 2012, the Ministerial Cabinet approved both the Egyptian Solar Plan targeting 3500 MW of solar energy by 2027, and the National Energy Efficiency Action Plan (NEEAP to reduce energy consumption 5% during the period from 2012-2015 compared to the average consumption of the previous 5 years. We believe that these plans will not bring their expected fruits unless they are well orchestrated with other sectoral development plans in areas such as agriculture, transport, housing and services, amongst others. This paper aims to investigate the Egyptian NEEAP and assess whether the adopted national energy efficiency plan and the associated policies on all other development sectors adopted by the government have sound implications. We aim to find out whether the development policies with a focus on energy policy are set in an integrated or fragmented way.

  1. Skype me! Socially contingent interactions help toddlers learn language.

    Science.gov (United States)

    Roseberry, Sarah; Hirsh-Pasek, Kathy; Golinkoff, Roberta M

    2014-01-01

    Language learning takes place in the context of social interactions, yet the mechanisms that render social interactions useful for learning language remain unclear. This study focuses on whether social contingency might support word learning. Toddlers aged 24-30 months (N = 36) were exposed to novel verbs in one of three conditions: live interaction training, socially contingent video training over video chat, and noncontingent video training (yoked video). Results suggest that children only learned novel verbs in socially contingent interactions (live interactions and video chat). This study highlights the importance of social contingency in interactions for language learning and informs the literature on learning through screen media as the first study to examine word learning through video chat technology. © 2013 The Authors. Child Development © 2013 Society for Research in Child Development, Inc.

  2. A New Method for Local Energy Planning in Developing Countries

    International Nuclear Information System (INIS)

    Van Beeck, N.

    2001-01-01

    Energy planning is an essential tool in the economic development of industrialized as well as developing countries. Energy planning in this paper is restricted to the selection of new energy systems for the production of proper energy forms in order to meet increased energy demand. This demand is actually the desire for certain energy services, which are the starting point of the new decision support method for local energy planning presented in this paper. In the decision making process concerning energy planning at the local level it is important to include context-related issues because the context determines for a large part the viability of the technologies or systems used. The context, in turn, is represented by the aims of the relevant actors, which are translated into measurable indicators to compare the different options. The impact assessment must allow for inclusion of all the indicators, either quantitative or qualitative in order to find the most appropriate technology for a region rather than the technically best or economically most optimal one. Appropriateness is defined by the context and is thus case specific, but the framework described in this paper is generally applicable within the given limitations. Note that the new method described in this paper is a decision support tool, implying that it does not decide for the energy planner which actions to take. The ultimate decision must be made by the planners themselves

  3. Improving energy audit process and report outcomes through planning initiatives

    Science.gov (United States)

    Sprau Coulter, Tabitha L.

    Energy audits and energy models are an important aspect of the retrofit design process, as they provide project teams with an opportunity to evaluate a facilities current building systems' and energy performance. The information collected during an energy audit is typically used to develop an energy model and an energy audit report that are both used to assist in making decisions about the design and implementation of energy conservation measures in a facility. The current lack of energy auditing standards results in a high degree of variability in energy audit outcomes depending on the individual performing the audit. The research presented is based on the conviction that performing an energy audit and producing a value adding energy model for retrofit buildings can benefit from a revised approach. The research was divided into four phases, with the initial three phases consisting of: 1.) process mapping activity - aimed at reducing variability in the energy auditing and energy modeling process. 2.) survey analysis -- To examine the misalignment between how industry members use the top energy modeling tools compared to their intended use as defined by software representatives. 3.) sensitivity analysis -- analysis of the affect key energy modeling inputs are having on energy modeling analysis results. The initial three phases helped define the need for an improved energy audit approach that better aligns data collection with facility owners' needs and priorities. The initial three phases also assisted in the development of a multi-criteria decision support tool that incorporates a House of Quality approach to guide a pre-audit planning activity. For the fourth and final research phase explored the impacts and evaluation methods of a pre-audit planning activity using two comparative energy audits as case studies. In each case, an energy audit professionals was asked to complete an audit using their traditional methods along with an audit which involved them first

  4. US Department of Energy Integrated Resource Planning Program: Accomplishments and opportunities

    Energy Technology Data Exchange (ETDEWEB)

    White, D.L. [Oak Ridge National Lab., TN (United States); Mihlmester, P.E. [Aspen Systems Corp., Oak Ridge, TN (United States)

    1993-12-17

    The US Department of Energy Integrated Resource Planning Program supports many activities and projects that enhance the process by which utilities assess demand and supply options and, subsequently, evaluate and select resources. The US Department of Energy program coordinates integrated resource planning in risk and regulatory analysis; utility and regional planning; evaluation and verification; information transfer/technological assistance; and demand-side management. Professional staff from the National Renewable Energy Laboratory, Oak Ridge National Laboratory, Lawrence Berkeley Laboratory, and Pacific Northwest Laboratories collaborate with peers and stakeholders, in particular, the National Association of Regulatory Utility Commissioners, and conduct research and activities for the US Department of Energy. Twelve integrated resource planning activities and projects are summarized in this report. The summaries reflect the diversity of planning and research activities supported by the Department. The summaries also reflect the high levels of collaboration and teaming that are required by the Program and practiced by the researchers. It is concluded that the Program is achieving its objectives by encouraging innovation and improving planning and decision making. Furthermore, as the Department continues to implement planned improvements in the Program, the Department is effectively positioned to attain its ambitious goals.

  5. The Role of Relational Information in Contingent Capture

    Science.gov (United States)

    Becker, Stefanie I.; Folk, Charles L.; Remington, Roger W.

    2010-01-01

    On the contingent capture account, top-down attentional control settings restrict involuntary attentional capture to items that match the features of the search target. Attention capture is involuntary, but contingent on goals and intentions. The observation that only target-similar items can capture attention has usually been taken to show that…

  6. Strategic Planning in Education: A Guide for Policymakers.

    Science.gov (United States)

    Cooper, Harry A.

    As defined in chapter I of this guide for policymakers, strategic planning is the method by which an organization identifies relevant trends in its environment, analyzes their potential implications, and projects an integrated strategy to address these future events and their contingencies. This process differs from formalized planning, based on…

  7. Fourth energy basic plan of Japan. Approved by cabinet in April 2014

    International Nuclear Information System (INIS)

    Ohsaki, Kazumasa

    2015-01-01

    The fourth Energy Basic Plan prepared mainly by the Ministry of Economy, Trade and Industry (METI) is the first plan after Fukushima Nuclear Accident. In this plan, the challenges and the directions of energy policy are discussed considering the mid- and long-term energy demand structure, especially 2018-2020 as the period of intensive reform. However, the energy mix indicates the composition of electrical sources and so on is not included due to the uncertainty about the prospect in the restart of nuclear power plant and the introduction of renewable energy sources. This article discusses the issues in the energy demand structure in Japan indicated in this plan, the principles in energy policy, as well as the perspectives for reform. These are summarized in three categories of (1) primary energy sources, (2) secondary energy supply, and (3) cross-sectional main subjects, particularly focusing on the viewpoints described in the chapter 2 and later. (S.K.)

  8. State energy conservation plan for New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-01-01

    The energy-savings and energy-management programs set up by state agencies in New Mexico are presented. Also the energy-savings and energy-management programs for public schools are presented. Plans and summaries are also given for the following program: solar water heaters for secondary schools; solar portable classroom demonstration; energy-savings and energy-management programs for county and municipal governments; energy-savings programs for commercial and residential sectors; weatherization; solar sustenance; energy-savings programs for hospitals and industrial buildings; carpools and vanpools; a program encouraging compliance with the national 55-mph speed limit; waste-oil recycling; utilitites; agriculture; procurement; modification; public information; and an administrative packet containing information on how to facilitate internal accounting procedures.

  9. National Action Plan for Energy Efficiency Report

    Energy Technology Data Exchange (ETDEWEB)

    National Action Plan for Energy Efficiency

    2006-07-01

    Summarizes recommendations, key barriers, and methods for energy efficiency in utility ratemaking as well as revenue requirements, resource planning processes, rate design, and program best practices.

  10. Electricity market readiness plan : Ontario Energy Board

    International Nuclear Information System (INIS)

    2001-03-01

    This document informs electric power market participants of the Ontario Energy Board's newly developed market readiness plan and target timelines that local distribution companies (LDCs) must meet for retail marketing. The Ontario Energy Board's plan incorporates relevant independent market operator (IMO)-administered market milestones with retail market readiness targeted for September 2001. The market readiness framework involves a self-certification process for LDCs by August 10, 2001, through which the Board will be able to monitor progress and assess the feasibility of meeting the target timelines. For retail market readiness, all LDCs will have to calculate settlement costs, produce unbundled bills, provide standard supply service, change suppliers and accommodate retail transactions. LDCs must be either authorized participants in the IMO-administered market or become retail customers of their host LDC. Unbundled bills will include itemized charges for energy price, transmission, distribution and debt retirement charge. 1 tab., 1 fig

  11. 48 CFR 403.405 - Misrepresentations or violations of the Covenant Against Contingent Fees.

    Science.gov (United States)

    2010-10-01

    ... violations of the Covenant Against Contingent Fees. 403.405 Section 403.405 Federal Acquisition Regulations... Contingent Fees 403.405 Misrepresentations or violations of the Covenant Against Contingent Fees. (a) A suspected misrepresentation or violation of the Covenant Against Contingent Fees shall be documented in...

  12. Energy Conservation and Development Plan. Southern Tier Central Region, New York

    Energy Technology Data Exchange (ETDEWEB)

    1979-07-01

    A summary is presented of the work of 40 volunteers working with regional planners to imagine, assess, and prescribe for the development of local energy resources (wind, solar, biomass, and water) and for conservation of all forms of energy. The plan contains a brief summary of the process the citizens followed in formulating the plan, the plans themselves, and appendices which contain more detailed comments by citizens on the possible consequences of the development of each resource. The areas (Chemung, Steuben, and Schuyler counties) experienced severe natural gas curtailments during the winter of 1976-1977. The formulation of an emergency energy conservation plan is also presented.

  13. Regional transmission subsystem planning

    Energy Technology Data Exchange (ETDEWEB)

    Costa Bortoni, Edson da [Quadrante Softwares Especializados Ltda., Itajuba, MG (Brazil); Bajay, Sergio Valdir; Barros Correia, Paulo de [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica; Santos, Afonso Henriques Moreira; Haddad, Jamil [Escola Federal de Engenharia de Itajuba, MG (Brazil)

    1994-12-31

    This work presents an approach for the planning of transmission systems by employing mixed--integer linear programming to obtain a cost and operating characteristics optimized system. The voltage loop equations are written in a modified form, so that, at the end of the analysis, the model behaves as a DC power flow, with the help of the two Kirchhoff`s laws, exempting the need of interaction with an external power flow program for analysis of the line loading. The model considers the occurrence of contingencies, so that the final result is a network robust to the most severe contingencies. This whole technique is adapted to the regional electric power transmission subsystems. (author) 9 refs., 4 figs.

  14. Category learning in the color-word contingency learning paradigm.

    Science.gov (United States)

    Schmidt, James R; Augustinova, Maria; De Houwer, Jan

    2018-04-01

    In the typical color-word contingency learning paradigm, participants respond to the print color of words where each word is presented most often in one color. Learning is indicated by faster and more accurate responses when a word is presented in its usual color, relative to another color. To eliminate the possibility that this effect is driven exclusively by the familiarity of item-specific word-color pairings, we examine whether contingency learning effects can be observed also when colors are related to categories of words rather than to individual words. To this end, the reported experiments used three categories of words (animals, verbs, and professions) that were each predictive of one color. Importantly, each individual word was presented only once, thus eliminating individual color-word contingencies. Nevertheless, for the first time, a category-based contingency effect was observed, with faster and more accurate responses when a category item was presented in the color in which most of the other items of that category were presented. This finding helps to constrain episodic learning models and sets the stage for new research on category-based contingency learning.

  15. Acquisition of automatic imitation is sensitive to sensorimotor contingency.

    Science.gov (United States)

    Cook, Richard; Press, Clare; Dickinson, Anthony; Heyes, Cecilia

    2010-08-01

    The associative sequence learning model proposes that the development of the mirror system depends on the same mechanisms of associative learning that mediate Pavlovian and instrumental conditioning. To test this model, two experiments used the reduction of automatic imitation through incompatible sensorimotor training to assess whether mirror system plasticity is sensitive to contingency (i.e., the extent to which activation of one representation predicts activation of another). In Experiment 1, residual automatic imitation was measured following incompatible training in which the action stimulus was a perfect predictor of the response (contingent) or not at all predictive of the response (noncontingent). A contingency effect was observed: There was less automatic imitation indicative of more learning in the contingent group. Experiment 2 replicated this contingency effect and showed that, as predicted by associative learning theory, it can be abolished by signaling trials in which the response occurs in the absence of an action stimulus. These findings support the view that mirror system development depends on associative learning and indicate that this learning is not purely Hebbian. If this is correct, associative learning theory could be used to explain, predict, and intervene in mirror system development.

  16. Contingency learning in alcohol dependence and pathological gambling: learning and unlearning reward contingencies

    NARCIS (Netherlands)

    Vanes, L.D.; Holst, R.J. van; Jansen, J.M.; Brink, W. van den; Oosterlaan, J.; Goudriaan, A.E.

    2014-01-01

    BACKGROUND: Patients with alcohol dependence (AD) and pathological gambling (PG) are characterized by dysfunctional reward processing and their ability to adapt to alterations of reward contingencies is impaired. However, most neurocognitive tasks investigating reward processing involve a complex

  17. Contingency Learning in Alcohol Dependence and Pathological Gambling: Learning and Unlearning Reward Contingencies

    NARCIS (Netherlands)

    Vanes, L.D.; Holst, R.; Jansen, J.D.; van den Brink, W.A.; Oosterlaan, J.; Goudriaan, A.E.

    2014-01-01

    Background: Patients with alcohol dependence (AD) and pathological gambling (PG) are characterized by dysfunctional reward processing and their ability to adapt to alterations of reward contingencies is impaired. However, most neurocognitive tasks investigating reward processing involve a complex

  18. 75 FR 27986 - Electronic Filing System-Web (EFS-Web) Contingency Option

    Science.gov (United States)

    2010-05-19

    ...] Electronic Filing System--Web (EFS-Web) Contingency Option AGENCY: United States Patent and Trademark Office... contingency option when the primary portal to EFS-Web has an unscheduled outage. Previously, the entire EFS-Web system is not available to the users during such an outage. The contingency option in EFS-Web will...

  19. The Graduate School and Its Organizational Structure: A Contingency Theory Approach.

    Science.gov (United States)

    Sanford, Judith Babcock

    Contingency theory, the formal structure of graduate schools, and the applicability of contingency variables to graduate schools as organizations are examined. Contingency theory is based on an open systems concept that views an organization as composed of many interdependent parts that are interacting with one another. It also holds that under…

  20. Contingency Table Browser - prediction of early stage protein structure.

    Science.gov (United States)

    Kalinowska, Barbara; Krzykalski, Artur; Roterman, Irena

    2015-01-01

    The Early Stage (ES) intermediate represents the starting structure in protein folding simulations based on the Fuzzy Oil Drop (FOD) model. The accuracy of FOD predictions is greatly dependent on the accuracy of the chosen intermediate. A suitable intermediate can be constructed using the sequence-structure relationship information contained in the so-called contingency table - this table expresses the likelihood of encountering various structural motifs for each tetrapeptide fragment in the amino acid sequence. The limited accuracy with which such structures could previously be predicted provided the motivation for a more indepth study of the contingency table itself. The Contingency Table Browser is a tool which can visualize, search and analyze the table. Our work presents possible applications of Contingency Table Browser, among them - analysis of specific protein sequences from the point of view of their structural ambiguity.

  1. Dissociating Contingency Awareness and Conditioned Attitudes: Evidence of Contingency-Unaware Evaluative Conditioning

    Science.gov (United States)

    Hutter, Mandy; Sweldens, Steven; Stahl, Christoph; Unkelbach, Christian; Klauer, Karl Christoph

    2012-01-01

    Whether human evaluative conditioning can occur without contingency awareness has been the subject of an intense and ongoing debate for decades, troubled by a wide array of methodological difficulties. Following recent methodological innovations, the available evidence currently points to the conclusion that evaluative conditioning effects do not…

  2. Action plan for energy efficiency 2003-2006. A Working Group Proposal

    International Nuclear Information System (INIS)

    2003-02-01

    The updating of the Action Plan for Energy Efficiency is closely related to the need to further intensify measures for promoting energy conservation that was highlighted in the debate in Parliament on the National Climate Strategy and building of a new nuclear power plant. The Working Group with responsibility for the preparation of the updating has made an assessment of the implementation and impact of the previous Action Plan for Energy Efficiency and sought to come up with new measures and ways of increasing the effect of the actions in the previous action plan. The main instruments presented in the updated action plan are developing new technologies, economic instruments, energy conservation agreements, laws and regulations and information and training. The action plan comprises proposals for increasing the budget for energy subsidies for companies and bodies and finding new formulas for the funding of energy saving investments. Further, the aid for the renovation of buildings is proposed to be enhanced. More effort is also needed as concerns disseminating information on energy saving. The development of new technologies requires that the funding from the National Technology Agency (Tekes) for energy efficiency is kept at least at the level of 1999. An implementation of the measures proposed would require a contribution from the state amounting to about E 80 million per year. The system of Energy Conservation Agreements is proposed to be further extended and developed. The agreements could to a larger extent than before cover research and product development processes and processes for purchasing of goods and services. The Working Group proposes further examination of the possibility of imposing binding targets and applying sanctions. Energy taxation is proposed to be developed further in order to promote energy saving and co- generation with the impact of the future Directive on emission allowance trading in mind. New research and development projects are

  3. Color and Contingency in Robert Boyle's Works.

    Science.gov (United States)

    Baker, Tawrin

    2015-01-01

    This essay investigates the relationship between color and contingency in Robert Boyle's Experiments and Considerations Touching Colours (1664) and his essays on the unsuccessfulness of experiments in Certain Physiological Essays (1661). In these two works Boyle wrestles with a difficult practical and philosophical problem with experiments, which he calls the problem of contingency. In Touching Colours, the problem of contingency is magnified by the much-debated issue of whether color had any deep epistemic importance. His limited theoretical principle guiding him in Touching Colours, that color is but modified light, further exacerbated the problem. Rather than theory, Boyle often relied on craftsmen, whose mastery of color phenomena was, Boyle mentions, brought about by economic forces, to determine when colors were indicators of important 'inward' properties of substances, and thus to secure a solid foundation for his experimental history of color.

  4. Application of the double-contingency principle within BNFL

    International Nuclear Information System (INIS)

    Strafford, P.I.D.

    1995-01-01

    Historically, the double-contingency principle has been used for criticality assessment within British Nuclear Fuels plc (BNFL). This paper outlines what is understood by the double-contingency principle to illustrate how it is applied in criticality safety assessments and to highlight various problem areas that are encountered and, where possible, how they might be solved

  5. Suited Contingency Ops Food - 2

    Science.gov (United States)

    Glass, J. W.; Leong, M. L.; Douglas, G. L.

    2014-01-01

    The contingency scenario for an emergency cabin depressurization event may require crewmembers to subsist in a pressurized suit for up to 144 hours. This scenario requires the capability for safe nutrition delivery through a helmet feed port against a 4 psi pressure differential to enable crewmembers to maintain strength and cognition to perform critical tasks. Two nutritional delivery prototypes were developed and analyzed for compatibility with the helmet feed port interface and for operational effectiveness against the pressure differential. The bag-in-bag (BiB) prototype, designed to equalize the suit pressure with the beverage pouch and enable a crewmember to drink normally, delivered water successfully to three different subjects in suits pressurized to 4 psi. The Boa restrainer pouch, designed to provide mechanical leverage to overcome the pressure differential, did not operate sufficiently. Guidelines were developed and compiled for contingency beverages that provide macro-nutritional requirements, a minimum one-year shelf life, and compatibility with the delivery hardware. Evaluation results and food product parameters have the potential to be used to improve future prototype designs and develop complete nutritional beverages for contingency events. These feeding capabilities would have additional use on extended surface mission EVAs, where the current in-suit drinking device may be insufficient.

  6. The Relevance of IT Service Management Maturity for IT Alignment and Its Strategy and Organization Size Contingencies

    DEFF Research Database (Denmark)

    Winkler, Till J.; Wulf, Jochen; Brenner, Walter

    2014-01-01

    to address whether and in which contingent contexts the institutionalization of ITSM frameworks, understood as collections of IT governance mechanisms, may contribute to IT alignment, a widely recognized prerequisite for superior IT performance. This workshop contribution is based on a cross-sectional survey...... with ITSM experts in which we measure levels of maturity of different ITSM planning and execution processes and focus on the organizations’ IS strategy (innovative versus conservative) as well as organization size as contingency factors hypothesized to moderate the effect of ITSM maturity on IT alignment....... Our findings strengthen the view that ITSM frameworks like ITIL incorporate governance mechanisms that can enhance the effect of the established relational antecedents of IT alignment. In addition, our data particularly provide evidence for the relevance of execution-level ITSM processes and suggest...

  7. The role of geodata and geotools in sustainable energy planning. The Interreg project 'North Sea Sustainable Energy Planning'; Die Bedeutung von Geodaten und Geowerkzeugen fuer eine nachhaltige Energieplanung. Das Interreg-Projekt 'North Sea Sustainable Energy Planning'

    Energy Technology Data Exchange (ETDEWEB)

    Knies, Juergen [Jade Hochschule Wilhelmshaven/Oldenburg/Elsfleth, Oldenburg (DE). Inst. fuer Angewandte Photogrammetrie und Geoinformatik (IAPG)

    2012-07-01

    The Interreg IVB project 'North Sea Sustainable Energy Planning' is to promote the development of models for regional development in consideration of renewable energy sources and the implementation of measures for higher energy efficiency in consideration of regional and international boundary conditions. Geodata and geotools provide a basis for sustainable energy planning. The Institute of Applied Photogrammetry and Geoinformatics of Jade Hochschule University developed concepts and geotools to support decision-makers in this task. The concepts and tools are presented in this paper.

  8. Contingency learning in alcohol dependence and pathological gambling: learning and unlearning reward contingencies

    NARCIS (Netherlands)

    Vanes, Lucy D.; van Holst, Ruth J.; Jansen, Jochem M.; van den Brink, Wim; Oosterlaan, Jaap; Goudriaan, Anna E.

    2014-01-01

    Patients with alcohol dependence (AD) and pathological gambling (PG) are characterized by dysfunctional reward processing and their ability to adapt to alterations of reward contingencies is impaired. However, most neurocognitive tasks investigating reward processing involve a complex mix of

  9. Pricing and Capacity Planning Problems in Energy Transmission Networks

    DEFF Research Database (Denmark)

    Villumsen, Jonas Christoffer

    strategy. In the Nordic electricity system a market with zonal prices is adopted. We consider the problem of designing zones in an optimal way explicitly considering uncertainty. Finally, we formulate the integrated problem of pipeline capacity expansion planning and transmission pricing in natural gas...... necessitates a radical change in the way we plan and operate energy systems. Another paradigm change which began in the 1990’s for electricity systems is that of deregulation. This has led to a variety of different market structures implemented across the world. In this thesis we discuss capacity planning...... and transmission pricing problems in energy transmission networks. Although the modelling framework applies to energy networks in general, most of the applications discussed concern the transmission of electricity. A number of the problems presented involves transmission switching, which allows the operator...

  10. Feasibility of dual-energy computed tomography in radiation therapy planning

    Science.gov (United States)

    Sheen, Heesoon; Shin, Han-Back; Cho, Sungkoo; Cho, Junsang; Han, Youngyih

    2017-12-01

    In this study, the noise level, effective atomic number ( Z eff), accuracy of the computed tomography (CT) number, and the CT number to the relative electron density EDconversion curve were estimated for virtual monochromatic energy and polychromatic energy. These values were compared to the theoretically predicted values to investigate the feasibility of the use of dual-energy CT in routine radiation therapy planning. The accuracies of the parameters were within the range of acceptability. These results can serve as a stepping stone toward the routine use of dual-energy CT in radiotherapy planning.

  11. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site

  12. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  13. Energy expansion planning by considering electrical and thermal expansion simultaneously

    International Nuclear Information System (INIS)

    Abbasi, Ali Reza; Seifi, Ali Reza

    2014-01-01

    Highlights: • This paper focused on the expansion planning optimization of energy systems. • Employing two form of energy: the expansion of electrical and thermal energies. • The main objective is to minimize the costs. • A new Modified Honey Bee Mating Optimization (MHBMO) algorithm is applied. - Abstract: This study focused on the expansion planning optimization of energy systems employing two forms of energy: the expansion of electrical and thermal energies simultaneously. The main objective of this investigation is confirming network adequacy by adding new equipment to the network, over a given planning horizon. The main objective of the energy expansion planning (EEP) is to minimize the real energy loss, voltage deviation and the total cost of installation equipments. Since the objectives are different and incommensurable, it is difficult to solve the problem by the conventional approaches that may optimize a single objective. So, the meta-heuristic algorithm is applied to this problem. Here, Honey Bee Mating Optimization algorithm (HBMO) as a new evolutionary optimization algorithm is utilized. In order to improve the total ability of HBMO for the global search and exploration, a new modification process is suggested such a way that the algorithm will search the total search space globally. Also, regarding the uncertainties of the new complicated energy systems, in this paper for the first time, the EEP problem is investigated in a stochastic environment by the use of probabilistic load flow technique based on Point Estimate Method (PEM). In order to evaluate the feasibility and effectiveness of the proposed algorithm, two modified test systems are used as case studies

  14. ACCOUNTING FOR CONTINGENT CONSIDERATIONS IN BUSINESS COMBINATIONS

    OpenAIRE

    Gurgen KALASHYAN

    2017-01-01

    According to IFRS 3 Business Combinations contingent considerations must be included in the total consideration given for the acquired entity along with cash, other assets, ordinary or preference equity instruments, options, warrants. The contingent consideration is the determined amount which acquiring entity has to pay to acquired entity provided, that certain conditions will be fulfilled in the future. In case the provisions are not satisfied, we will get the situation when the amount of c...

  15. Encountering energy strategies and plans with the social context of household practice

    DEFF Research Database (Denmark)

    Quitzau, Maj-Britt; Nyborg, Sophie; Røpke, Inge

    Encountering energy strategies and plans with the social context of household practices Governments and utility companies have developed a great deal of strategies and plans on how to cope with energy saving in households, since this represents a major issue for climate change remediation. Many...... in households, and provides important clues about the potentiality to anchor energy strategies and plans in the social context of local households....

  16. The challenges and directions for nuclear energy policy in Japan. Japan's nuclear energy national plan

    International Nuclear Information System (INIS)

    Yanase, Tadao

    2007-01-01

    According to the 'framework for nuclear energy policy' (October, 2005 adopted by cabinet), basic goals of nuclear policy are (1) for nuclear energy to continue to meet more than around 30-40% of electricity supply, and also (2) to further promote a fuel cycle steadily aiming at commercial introduction of a fast breeder by 2050. In order to realize an aim of this framework for nuclear energy policy', the nuclear energy subcommittee of the METI advisory committee deliberated concrete actions and the subcommittee recommendations were drawn up as 'Japan's nuclear energy national plan' in August, 2006 and incorporated as main part of the revised 'basic plan on energy' adopted by the cabinet in March 2007. Backgrounds and directions of future actions for nuclear energy policy were described. (T. Tanaka)

  17. A study of the user's perception of economic value in nursing visits to primary care by the method of contingent valuation

    Directory of Open Access Journals (Sweden)

    Conde-López Juan

    2011-10-01

    Full Text Available Abstract Background The identification of the attribution of economic value that users of a health system assign to a health service could be useful in planning these services. The method of contingent valuation can provide information about the user's perception of value in monetary terms, and therefore comparable between services of a very different nature. This study attempts to extract the economic value that the subject, user of primary care nursing services in a public health system, attributes to this service by the method of contingent valuation, based on the perspectives of Willingness to Pay (WTP and Willingness to Accept [Compensation] (WTA. Methods/Design This is an economic study with a transversal design. The contingent valuation method will be used to estimate the user's willingness to pay (WTP for the care received from the primary care nurse and the willingness to accept [compensation] (WTA, were this service eliminated. A survey that meets the requisites of the contingent valuation method will be constructed and pilot-tested. Subsequently, 600 interviews will be performed with subjects chosen by systematic randomized sampling from among those who visit nursing at twenty health centers with different socioeconomic characteristics in the Community of Madrid. The characteristics of the subject and of the care received that can explain the variations in WTP, WTA and in the WTP/WTA ratio expressed will be studied. A theoretical validation of contingent valuation will be performed constructing two explanatory multivariate mixed models in which the dependent variable will be WTP, and the WTP/WTA relationship, respectively. Discussion The identification of the attribution of economic value to a health service that does not have a direct price at the time of use, such as a visit to primary care nursing, and the definition of a profile of "loss aversion" in reference to the service evaluated, can be relevant elements in planning

  18. Energy-Aware Path Planning for UAS Persistent Sampling and Surveillance

    Science.gov (United States)

    Shaw-Cortez, Wenceslao

    The focus of this work is to develop an energy-aware path planning algorithm that maximizes UAS endurance, while performing sampling and surveillance missions in a known, stationary wind environment. The energy-aware aspect is specifically tailored to extract energy from the wind to reduce thrust use, thereby increasing aircraft endurance. Wind energy extraction is performed by static soaring and dynamic soaring. Static soaring involves using upward wind currents to increase altitude and potential energy. Dynamic soaring involves taking advantage of wind gradients to exchange potential and kinetic energy. The path planning algorithm developed in this work uses optimization to combine these soaring trajectories with the overarching sampling and surveillance mission. The path planning algorithm uses a simplified aircraft model to tractably optimize soaring trajectories. This aircraft model is presented and along with the derivation of the equations of motion. A nonlinear program is used to create the soaring trajectories based on a given optimization problem. This optimization problem is defined using a heuristic decision tree, which defines appropriate problems given a sampling and surveillance mission and a wind model. Simulations are performed to assess the path planning algorithm. The results are used to identify properties of soaring trajectories as well as to determine what wind conditions support minimal thrust soaring. Additional results show how the path planning algorithm can be tuned between maximizing aircraft endurance and performing the sampling and surveillance mission. A means of trajectory stitching is demonstrated to show how the periodic soaring segments can be combined together to provide a full solution to an infinite/long horizon problem.

  19. An Improved On-line Contingency Screening for Power System Transient Stability Assessment

    DEFF Research Database (Denmark)

    Weckesser, Johannes Tilman Gabriel; Jóhannsson, Hjörtur; Glavic, Mevludin

    2017-01-01

    This paper presents a contingency screening method and a framework for its on-line implementation. The proposed method carries out contingency screening and on-line stability assessment with respect to first-swing transient stability. For that purpose, it utilizes the single machine equivalent...... method and aims at improving the prior developed contingency screening approaches. In order to determine vulnerability of the system with respect to a particular contingency, only one time-domain simulation needs to be performed. An early stop criteria is proposed so that in a majority of the cases...... the simulation can be terminated after a few hundred milliseconds of simulated system response. The method's outcome is an assessment of the system's stability and a classification of each considered contingency. The contingencies are categorized by exploiting parameters of an equivalent one machine infinite bus...

  20. Energy-Integrating Master Plan for the City of Atlantic City, New Jersey: energy conservation element. Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    1978-11-01

    The Master Plan describes a coordinated energy-conservation effort for the City, the effective application and ultimate success of which depend primarily on the active involvement of the City government and its functional departments. Following an introductory section, Section XXI, Community Energy Determinants, describes the natural and man-made environment, growth and energy profiles, and the institutional environment. Additional sections are entitled: Energy-Conservation Options (passive energy options and active energy-conservation options); Energy Integration; Community Energy Management; Energy-Conservation Implementation Plan; and an appendix containing an energy-related glossary, a directory to various sources of information on energy conservation, various technical documents, a copy of the National Energy Act, and a bibliography. (MCW)