WorldWideScience

Sample records for eloisatron project erice

  1. SSC beam dynamics scaled to the Eloisatron

    International Nuclear Information System (INIS)

    Ritson, D.

    1992-03-01

    As crosssections drop as E -2 a desirable target for a 100 TeV the Eloisatron would be to achieve luminosities ∼1.10 35 cm 2 /sec. To understand the impact of such an objective we have compared parameters for the SSC and Eloisatron to differentiate areas which involve considerable extrapolations from current technologies from those which represent more conventional scale-ups. Synchrotron radiation losses per m for the same guide magnetic field associated with such luminosities would be up by E 2 x I where E is the energy and I is the circulating current. This would result in energy densities of ∼250 times the nominal SSC values. The SSC is already limited by installed refrigeration power and if the circulating current was to be increased would have to use liners at liquid nitrogen temperatures to intercept the radiation as is proposed for the LHC. This issue was the subject of lively discussion at the workshop and is dealt with elsewhere by other authors. This author believed that the radiation could be intercepted by room temperature catchers spaced every 15--25 m around the ring. To obtain the requisite luminosities it assumes similar bunch spacing but circulating currents an order of magnitude larger than at the SSC. The SSC already uses a bunch spacing as small as 5 m and further reduction does not appear easy. The justification for the choice of bore for the magnets, emittances and attainable luminosities are discussed below. A further section looks into whether seismic ground disturbances might cause unacceptable emittance growth. The conclusion of this section is that careful use of current design practices should be adequate and that it is unlikely that exotic vibration free mounts will be required

  2. Beauty physics at the ultrahigh energies of the ELOISATRON [Euroasiatic Long Intersecting Superconducting Accelerator Synchrotron

    International Nuclear Information System (INIS)

    Cox, B.

    1988-02-01

    The potential for experimentally studying B physics at the proposed INFN 100 TeV ELOISATRON (Euroasiatic Long Intersecting Superconducting Accelerator Synchrotron) is compared with possibilities at 40 TeV at the Superconducting Super Collider. The effect of the increase in center of mass energy on the production and decay of B mesons has been investigated, particularly with respect to the accummulation of large samples of B hadron decays necessary for the detection of CP violating effects. 13 refs., 7 figs., 1 tab

  3. Professor Eric Can't See: A Project-Based Learning Case for Neurobiology Students.

    Science.gov (United States)

    Ogilvie, Judith Mosinger; Ribbens, Eric

    2016-01-01

    "Professor Eric Can't See" is a semi-biographical case study written for an upper level undergraduate Neurobiology of Disease course. The case is integrated into a unit using a project-based learning approach to investigate the retinal degenerative disorder Retinitis pigmentosa and the visual system. Some case study scenes provide specific questions for student discussion and problem-based learning, while others provide background for student inquiry and related active learning exercises. The case was adapted from "'Chemical Eric' Can't See," and could be adapted for courses in general neuroscience or sensory neuroscience.

  4. Eric Karp | NREL

    Science.gov (United States)

    Karp Photo of Eric Karp. Eric Karp Researcher III-Chemical Engineering Eric.Karp@nrel.gov | 303-384 science of catalytic reactions Chemical process automation Clean technology commercialization Affiliated (right). Education Ph.D., Chemical Engineering, University of Washington, 2012 M.S., Chemical Engineering

  5. ERIC: Sphinx or Golden Griffin?

    Science.gov (United States)

    Lopez, Manuel D.

    1989-01-01

    Evaluates the Educational Resources Information Center (ERIC) database. Summarizes ERIC's history and organization, and discusses criticisms concerning access, currency, and database content. Reviews role of component clearinghouses, indexing practices, thesaurus structure, international coverage, and comparative studies. Finds ERIC a valuable…

  6. The Eric Cantor Upset

    DEFF Research Database (Denmark)

    Ashbee, Edward

    2014-01-01

    US update. The surprise primary defat of Eric Cantor, which shows that the Tea Party is still in business......US update. The surprise primary defat of Eric Cantor, which shows that the Tea Party is still in business...

  7. ERIC User Services Manual. Revised Edition.

    Science.gov (United States)

    Wagner, Judith O., Comp.

    This manual explains how the user services functions, usually performed by a User Services Coordinator, can be conducted in the 16 ERIC (Educational Resources Information Center) Clearinghouses and the various adjunct ERIC Clearinghouses. It provides guidelines, suggestions, and examples of how ERIC components currently perform the user services…

  8. How to Use Eric. Revised Edition.

    Science.gov (United States)

    Griffin, Louise

    This booklet defines the ERIC system and gives directions on the use of "Research in Education." It also tells about the Eric Document Reproduction Service (EDRS), its use, and its products. In addition, it tells what types of materials ERIC Clearinghouses process. A list of the 19 Clearinghouses, with a description of their specific interests and…

  9. Report of the ERIC Management Review Group.

    Science.gov (United States)

    Carter, Launor F.; And Others

    The mission of the ERIC Management Review Group was to examine the practices and procedures used by Central ERIC Management in their guidance and management of the 19 ERIC clearinghouses. The major topics covered in this report are: recommendations; the role of the clearinghouses; the bibliographic and documentation function; the interpretation…

  10. Project To Design a Marketing Plan for Promoting Educators' Awareness of and Access to ERIC Products. Proposed Marketing Plan.

    Science.gov (United States)

    Contemporary Associates, Inc., Washington, DC.

    The proposed strategy, which is designed to maximize the effectiveness and minimize the costs of marketing the Information Analysis Products (IAPs) produced by the 16 ERIC Clearinghouses, is based on a study of the concept of centralized versus decentralized ordering of selected ERIC products. The experiment measured four variables--postage,…

  11. Learning about the Human Genome. Part 2: Resources for Science Educators. ERIC Digest.

    Science.gov (United States)

    Haury, David L.

    This ERIC Digest identifies how the human genome project fits into the "National Science Education Standards" and lists Human Genome Project Web sites found on the World Wide Web. It is a resource companion to "Learning about the Human Genome. Part 1: Challenge to Science Educators" (Haury 2001). The Web resources and…

  12. People and things. CERN Courier, Jan-Feb 1989, v.29(1)

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1989-01-15

    The article reports on achievements of various people, staff changes and position opportunities within the CERN organization and contains news updates on upcoming or past events. Jointly sponsored by Tel Aviv University and the Weizmann Institute of Science, the 9th International Conference 'Physics in Collision ' will take place in the Kibbutz Ma'ale Hahamisha on the outskirts of Jerusalem from June 19-22. A Users' Meeting of the European Synchrotron Radiation Facility (ESRF) will be held in Grenoble from 20-23 March. An Eloisatron Project Research Workshop 'Higgs Particle(s) - Physics Issues and Search Strategies in High Energy Collisions ' will be held at the Ettore Majorana Centre, Erice, Sicily, from 15-26 July. On November 17 a beam of carbon-12 6+ ions at an energy of 73 MeV was successfully electron cooled at the Test Storage Ring TSR of the Max Planck Institut fur Kernphysik in Heidelberg. On 13 November 1988 Erhard Fischer died from cancer. After joining CERN in 1958 he began basic R and D on ultrahigh vacuum problems for the proposed CESAR storage ring's.

  13. New Access Points to ERIC--CD-ROM Versions. ERIC Digest.

    Science.gov (United States)

    McLaughlin, Pamela W.

    This digest reviews three CD-ROM (compact disc-read only memory) versions of the ERIC (Educational Resources Information Center) database currently being delivered or tested and provides information for comparison. However, no attempt is made to recommend any one product. The advantages and disadvantages of the acquisition of CD-ROM databases are…

  14. People and things. CERN Courier, Jan-Feb 1989, v.29(1)

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The article reports on achievements of various people, staff changes and position opportunities within the CERN organization and contains news updates on upcoming or past events. Jointly sponsored by Tel Aviv University and the Weizmann Institute of Science, the 9th International Conference 'Physics in Collision ' will take place in the Kibbutz Ma'ale Hahamisha on the outskirts of Jerusalem from June 19-22. A Users' Meeting of the European Synchrotron Radiation Facility (ESRF) will be held in Grenoble from 20-23 March. An Eloisatron Project Research Workshop 'Higgs Particle(s) - Physics Issues and Search Strategies in High Energy Collisions ' will be held at the Ettore Majorana Centre, Erice, Sicily, from 15-26 July. On November 17 a beam of carbon-12 6+ ions at an energy of 73 MeV was successfully electron cooled at the Test Storage Ring TSR of the Max Planck Institut fur Kernphysik in Heidelberg. On 13 November 1988 Erhard Fischer died from cancer. After joining CERN in 1958 he began basic R and D on ultrahigh vacuum problems for the proposed CESAR storage ring's

  15. Skyview Foods: Eric's Real Dilemma with Channel Partners

    Science.gov (United States)

    Castleberry, Stephen B.

    2011-01-01

    As a marketing analyst, Eric is faced with several ethical dilemmas. When asked to engage in unethical and illegal behavior, Eric must decide whether to obey his boss and fudge the numbers (the counts of product purchased in order to get reimbursed more from the manufacturer during special sales) or take the ethical route. The case consists of two…

  16. Eric Soovere fotodest sõjafotograafia kontektis / Ahto Sooaru

    Index Scriptorium Estoniae

    Sooaru, Ahto

    2011-01-01

    Püütakse selgitada Eric Soovere piltide ja teksti tausta põgenemisel kodumaalt, näidatakse tema töö tähtsust Eesti visuaalkultuuris ja käsitletakse ka sõjafotograafia ajalugu ning sõjafotograafia peegeldusi kunstis. Praktilise tööna sündis DVD, kuhu on koondatud Eric Soovere päevik ja fotomaterjal kaasaegse formaadina

  17. Women's Issues in an Era of Inclusion. ERIC/ChESS.

    Science.gov (United States)

    Risinger, C. Frederick

    1997-01-01

    Presents a brief annotated bibliography of sources addressing women's issues within the ERIC database. The sources include journal articles, monographs, ERIC Digests, and folksong collections. They cover aspects of women and education, including women in the curriculum, women's suffrage, and women's history. (MJP)

  18. Saladusi mäletavad pildid : järelvaade Eric Soovere fotograafilisele dokumentalistikale / Peeter Linnap

    Index Scriptorium Estoniae

    Linnap, Peeter, 1960-

    2010-01-01

    Eric Sooverest ja tema fotoloomingust. Eric Soovere ja Johannes Pääsukese loomingu võrdlus. Katkendeid Eric Soovere raamatust "Käru ja kaameraga : pilte ja päevikulehti põgenemisteelt 1944-1949". Pikemalt emigreerumisest Ameerikasse

  19. Database Changes (Post-Publication). ERIC Processing Manual, Section X.

    Science.gov (United States)

    Brandhorst, Ted, Ed.

    The purpose of this section is to specify the procedure for making changes to the ERIC database after the data involved have been announced in the abstract journals RIE or CIJE. As a matter of general ERIC policy, a document or journal article is not re-announced or re-entered into the database as a new accession for the purpose of accomplishing a…

  20. ERIC/RCS Report: Animals in Literature.

    Science.gov (United States)

    O'Donnell, Holly

    1980-01-01

    Notes children's continuing interest in animal stories, examines some characteristics of animal stories as discussed in ERIC documents, and suggests booklists that include listings of animal stories. (ET)

  1. Fractal dimensions the digital art of Eric Hammel

    CERN Document Server

    Hammel, Eric

    2014-01-01

    The concept behind fractal geometry is extremely difficult to explain . . . but easy to see and enjoy. Eric Hammel, a professional author of military history books, is unable to explain fractals in a way that will be clear to anyone else, but most mathematicians can't explain fractals in language most people can understand. The simplest explanation is that fractals are graphic representations of high-order mathematical formulas that repeat patterns to infinity.Don't get hung up on the math. It's really all in the seeing. Like Volume 1 of Eric Hammel's Fractal Dimensions, Volume 2 is filled wit

  2. Fractal dimensions the digital art of Eric Hammel

    CERN Document Server

    Hammel, Eric

    2014-01-01

    The concept behind fractal geometry is extremely difficult to explain . . . but easy to see and enjoy. Eric Hammel, a professional author of military history books, is unable to explain fractals in a way that will be clear to anyone else, but most mathematicians can't explain fractals in language most people can understand. The simplest explanation is that fractals are graphic representations of high-order mathematical formulas that repeat patterns to infinity.Don't get hung up on the math. It's really all in the seeing. Like Volumes 1, 2, and 3 of Eric Hammel's Fractal Dimensions, Volume 4 is

  3. Fractal dimensions the digital art of Eric Hammel

    CERN Document Server

    Hammel, Eric

    2014-01-01

    The concept behind fractal geometry is extremely difficult to explain . . . but easy to see and enjoy. Eric Hammel, a professional author of military history books, is unable to explain fractals in a way that will be clear to anyone else, but most mathematicians can't explain fractals in language most people can understand. The simplest explanation is that fractals are graphic representations of high-order mathematical formulas that repeat patterns to infinity.Don't get hung up on the math. It's really all in the seeing. Like Volumes 1 and 2 of Eric Hammel's Fractal Dimensions, Volume 3 is fil

  4. Women's Suffrage: A Sampler of ERIC Resources.

    Science.gov (United States)

    Risinger, C. Frederick

    1995-01-01

    Discusses the resources available from the ERIC System on issues related to women's suffrage and women's rights. Includes an annotated bibliography of six resources, including lesson plans and historiography reviews. (CFR)

  5. ERIC/EECE Report. Mixed Age Grouping.

    Science.gov (United States)

    Cesarone, Bernard

    1995-01-01

    Summarizes eight recent ERIC documents and seven journal articles on mixed-age grouping. Includes discussions of teaching in the multiage classroom, Kentucky's Primary Program, developmentally appropriate practices in the primary grades, thematic instruction, attitudes toward mixed-age grouping, and questions and answers about mixed-age grouping.…

  6. Design considerations and expectations of a very large hadron collider

    International Nuclear Information System (INIS)

    Ruggiero, A.G.

    1996-01-01

    The ELOISATRON Project is a proton-proton collider at very high energy and very large luminosity. The main goal is to determine the ultimate performance that is possible to achieve with reasonable extrapolation of the present accelerator technology. A complete study and design of the collider requires that several steps of investigations are undertaken. The authors count five of such steps as outlined in the report

  7. Teaching about Presidential Elections. ERIC Digest.

    Science.gov (United States)

    Vontz, Thomas S.; Nixon, William A.

    Although elections are an annual theme in many social studies classrooms, presidential election years prompt increased interest among students in the electoral process and offer an opportunity to teach about a national election as it happens. This ERIC Digest describes the legal requirements and traditions of U.S. presidential elections, processes…

  8. "Innovation and Intellectual Property Policies in European Research Infrastructure Consortia - PART I: The Case of the European Spallation Source ERIC"

    DEFF Research Database (Denmark)

    Yu, Helen; Wested, Jakob; Minssen, Timo

    2017-01-01

    , the European Spallation Source ERIC is required to adopt various policy documents relating to the operation and management of the facility. These cover a wide variety of issues such as user access, public procurement, intellectual property rights (IPR), data management, and dissemination. One of the main goals...... of the problems society is facing today. To facilitate the creation and operation of such RIs, the EU adopted legal frameworks for European Research Infrastructure Consortia (ERIC). On August 31, 2015, the European Spallation Source (ESS) was established as an ERIC. Under the ERIC Regulations and ESS Statutes...... international research collaborations? The complex relationship between scientific excellence, innovation, and IPRs must be carefully considered. Taking the European Spallation Source ERIC as an example, this article investigates ERIC Regulations and EU policies and discusses what issues and perspectives ERICs...

  9. Adolescents: Your Children and Mine. ERIC Report.

    Science.gov (United States)

    Demo, Mary Penasack

    1981-01-01

    Reviews 10 items from the ERIC collection covering various aspects of adolescence: the impact of pop music, attitudes about drinking, television viewing, the effect of the new morality, the adolescent learning process, popular books, attitudes toward school, and others. (JMF)

  10. Eric Monkkonen (1942-2005)

    OpenAIRE

    Roth, Randolph

    2009-01-01

    Eric Monkkonen, who passed away on May 30, 2005 at the age of 62, was one of the greatest historians ever to write on the history of crime. An urban and social science historian by training, he dedicated his life to understanding the social problems that, like many historians of his generation, he believed most pressing: poverty, prejudice, and violence. He was an iconoclast in his approach to those problems, on good terms with ideologues of all stripes but unwilling to settle for ideological...

  11. Online Training and Practice Manual for ERIC Data Base Searchers. 2nd Edition.

    Science.gov (United States)

    Markey, Karen; Cochrane, Pauline A.

    Revised to reflect changes in both DIALOG and ERIC, this second edition of a self-improvement manual for online searchers who wish to refine their skills presents three basic approaches to searching and provides illustrations from DIALOG's ERIC ONTAP database. The manual is divided into two parts: an 8-step model of the total search process which…

  12. Freedom of Expression: A Troublesome Imperative. ERIC Report.

    Science.gov (United States)

    Del Polito, Carolyn M.

    1980-01-01

    Presents an annotated bibliography of 19 items from ERIC identifying troublesome paradoxes regarding the media and freedom of expression. Items are categorized by issues identified as relevant to radio and television, commercial advertising, and the press. (JMF)

  13. Television Violence and Children. ERIC/EECE Report.

    Science.gov (United States)

    Cesarone, Bernard

    1998-01-01

    Summarizes 12 recent documents and journal articles from the ERIC database that discuss topics related to television violence and children. Articles cited address the effects of television violence on child behavior and attitudes at school and home, and methods of reducing the impact of television on children. (JPB)

  14. Setting the stage for the EPOS ERIC: Integration of the legal, governance and financial framework

    Science.gov (United States)

    Atakan, Kuvvet; Bazin, Pierre-Louis; Bozzoli, Sabrina; Freda, Carmela; Giardini, Domenico; Hoffmann, Thomas; Kohler, Elisabeth; Kontkanen, Pirjo; Lauterjung, Jörn; Pedersen, Helle; Saleh, Kauzar; Sangianantoni, Agata

    2017-04-01

    , software and services (DDSS) accessible through EPOS. From a financial standpoint, EPOS elaborated common guidelines for all institutions providing services, and selected a costing model and funding approach which foresees a mixed support of the services via national contributions and ERIC membership fees. In the EPOS multi-disciplinary environment, harmonization and integration are required at different levels and with a variety of different stakeholders; to this purpose, a Service Coordination Board (SCB) and technical Harmonization Groups (HGs) were established to develop the EPOS metadata standards with the EPOS Integrated Central Services, and to harmonize data and product standards with other projects at European and international level, including e.g. ENVRI+, EUDAT and EarthCube (US).

  15. RAPD- and ERIC-Based Typing of Clinical and Environmental Pseudomonas aeruginosa Isolates.

    Science.gov (United States)

    Auda, Ibtesam Ghadban; Al-Kadmy, Israa M S; Kareem, Sawsan Mohammed; Lafta, Aliaa Khyuon; A'Affus, Mustafa Hussein Obeid; Khit, Ibrahim Abd Aloahd; Al Kheraif, Abdulaziz Abdullah; Divakar, Darshan Devang; Ramakrishnaiah, Ravikumar

    2017-03-01

    Pseudomonas aeruginosa is a major cause of nosocomial infection in children and adults, resulting in significant morbidity and mortality due to its ability to acquire drug resistance. The ability of P. aeruginosa in the environment to cause infection in individuals has been reported previously; henceforth, surveillance of the emergence and transmission of P. aeruginosa strains among patients is important for infection control in a clinical setup. Various gene-typing methods have been used for epidemiological typing of P. aeruginosa isolates for the purpose of surveillance. In this work, the suitability and comparability of two typing methods, enterobacterial repetitive intergenic consensus (ERIC)-PCR and random amplification of polymorphic DNA (RAPD)-PCR fingerprinting, were studied to characterize P. aeruginosa strains isolated from clinical and environmental sources. Forty-four clinical and environmental bacterial isolates of P. aeruginosa were collected between October 2015 and January 2016. DNA extraction, ERIC-PCR and RAPD-PCR, agarose gel electrophoresis, and phylogenetic analyses were carried using the unweighted pair-group method with mean. RAPD typing revealed less clonality among clinical isolates, whereas the ERIC method showed greater similarity in comparison with RAPD. Environmental isolates, however, showed greater similarity using RAPD compared with ERIC typing. With only a few exceptions, most clinical isolates were distinct from environmental isolates, irrespective of the typing method. In conclusion, both the RAPD and ERIC typing methods proved to be good tools in understanding clonal diversity. The results also suggest that there is no relationship between clinical and environmental isolates. The absence of clonality among the clinical isolates may indicate that most P. aeruginosa infection cases could be endemic and not epidemic and that endemic infections may be due to nonclonal strains of P. aeruginosa.

  16. La Disciplina Positiva (Positive Discipline). ERIC Digest.

    Science.gov (United States)

    ERIC Clearinghouse on Elementary and Early Childhood Education, Urbana, IL.

    This ERIC Digest suggests methods and language that can be used in handling difficult, but common, situations involving young children. The digest explains 12 methods of disciplining children that promote children's self-worth. These methods are: (1) showing children that the reasons for their actions are understood; (2) stating reasons; (3)…

  17. Online Public Access Catalogs. ERIC Fact Sheet.

    Science.gov (United States)

    Cochrane, Pauline A.

    A listing is presented of 17 documents in the ERIC database concerning the Online Catalog (sometimes referred to as OPAC or Online Public Access Catalog), a computer-based and supported library catalog designed for patron use. The database usually represents recent acquisitions and often contains information about books on order and items in…

  18. [Comparison of Bacteria ERIC-PCR Fingerprints of Index Fingers and Contactants].

    Science.gov (United States)

    Liu, Y T; Sun, D M; Shi, S P; Yang, X

    2018-02-01

    To explore the bacteria relevance between index fingers and contactant' surfaces (mobile phone touch screen and desktop of personal office table). Bacteria were collected from the index fingers, mobile phone touch screen and desktop of personal office table of 10 volunteers. Enterobacterial repetitive intergenic consensus (ERIC)-PCR fingerprint was established by PCR amplification technique of metagenome. There were 7 volunteers' ERIC-PCR fingerprints of index fingers matched that took from the mobile phone touch screens, and different from each other. There were 3 volunteers' ERIC-PCR fingerprints of index fingers matched that took from desk top of personal office table, and other 7 volunteers' ERIC-PCR fingerprints did not match perfectly with that took from desk top of personal office table, but had at least one similar band for both. The bacteria on index finger shows individual specificity, which on mobile phone touching screen and personal desktop may be a new biological sample of forensic identification. Copyright© by the Editorial Department of Journal of Forensic Medicine.

  19. Understanding Mathematics and Culture in Rural Contexts. ERIC Digest.

    Science.gov (United States)

    Bush, William S.

    This ERIC Digest provides an overview of concepts, writers, and tenets associated with the study of mathematics and culture and offers researchers a framework for the field, particularly with regard to rural contexts. (Author)

  20. The Industrial Revolution: An ERIC/ChESS Sample.

    Science.gov (United States)

    Pinhey, Laura A.

    2000-01-01

    Provides a list, from the ERIC database, of teaching materials and background information on the Industrial Revolution. Specific topics include life in Lowell (Massachusetts), the global impact of the Industrial Revolution, and England's Industrial Revolution. Offers directions for obtaining the full text of these materials. (CMK)

  1. "Innovation and Intellectual Property Policies in European Research Infrastructure Consortia - PART I: The Case of the European Spallation Source ERIC"

    DEFF Research Database (Denmark)

    Yu, Helen; Wested, Jakob; Minssen, Timo

    2017-01-01

    of the problems society is facing today. To facilitate the creation and operation of such RIs, the EU adopted legal frameworks for European Research Infrastructure Consortia (ERIC). On August 31, 2015, the European Spallation Source (ESS) was established as an ERIC. Under the ERIC Regulations and ESS Statutes......, the European Spallation Source ERIC is required to adopt various policy documents relating to the operation and management of the facility. These cover a wide variety of issues such as user access, public procurement, intellectual property rights (IPR), data management, and dissemination. One of the main goals...

  2. The future seen from Erice

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    A few specialists have been finding time to think beyond the LEP electron- positron Collider now being built at CERN and the SSC Superconducting Super Collider proposed for the US to the physics needs and accelerator possibilities of the future. Despite the modest effort, a lot of progress has been made in sorting the wheat from the chaff amongst proposed accelerator schemes and in defining crucial features of future machines. Some of this thinking came together at a seminar on 'New Techniques for Future Accelerators' held in Erice, Sicily, from 12-17 May

  3. The Great Depression: An ERIC/ChESS Sample.

    Science.gov (United States)

    Kulczak, Carrie

    2001-01-01

    Provides citations with abstracts from the ERIC database focusing on the Great Depression. Includes both background information and teaching materials on such topics as an overview of the New Deal, the arts and the Great Depression, and information on the Civilian Conservation Corps. Offers directions for accessing the materials. (CMK)

  4. Teaching and Learning about the Earth. ERIC Digest.

    Science.gov (United States)

    Lee, Hyonyong

    This ERIC Digest investigates the earth and space science guidelines of the National Science Education Standards. These guidelines are frequently referred to as the earth system and include components such as plate tectonics, the water cycle, and the carbon cycle. This Digest describes the development of earth systems science and earth systems…

  5. Saladusi mäletavad pildid : järelvaade Eric Soovere fotograafilisele dokumentalistikale / Peeter Linnap

    Index Scriptorium Estoniae

    Linnap, Peeter, 1960-

    2009-01-01

    Ameerikas elanud eesti fotograafi Eric Soovere (sünd. Erich Soeson, 1916-2008) eluloolisi andmeid. Tema loomingust, mis jaguneb kolme perioodi: etnograafiline fotokooslus Lõuna-Eesti külaelanikest (1930ndate lõpp), Sooverede perekonna põgenemisteekond Eestist USA-sse (ca 1944-1949), perekonna elu Cincinnatis USA-s (1950ndad). Fotod eestlaste põgenemisteekonnast on avaldatud raamatus Eric Soovere. Käru ja kaameraga : pilte ja päevikulehti põgenemisteelt 1944-1949. Tallinn : Olion, 1999

  6. El Metodo Llamado Proyecto (The Project Approach). ERIC Digest.

    Science.gov (United States)

    Katz, Lilian G.

    A project is an in-depth investigation of a topic worth learning more about, usually undertaken by a group of children within a class. The goal of a project is to learn more about a topic rather than to find answers to questions posed by a teacher. Project work is complementary to the systematic parts of a curriculum. Whereas systematic…

  7. Library Literacy Programs for English Language Learners. ERIC Digest.

    Science.gov (United States)

    McMurrer, Eileen; Terrill, Lynda

    This digest summarizes the history of public libraries and library literacy programs; describes current delivery models; and discusses initiatives in library literacy, profiling one successful public library program that serves adult English language learners and their families. (Adjunct ERIC Clearinghouse for ESL Literacy Education) (Author/VWL)

  8. Kunst elada piiri peal / Eric Kluitenberg ; interv. Heie Treier

    Index Scriptorium Estoniae

    Kluitenberg, Eric

    1999-01-01

    Võrguteoreetik Eric Kluitenberg Amsterdamist valgustab 'Interstanding 3' 'Ülalpool piire' tagamaad ja seost Eestiga. Üritus toob Eestisse rahvusvahelisi tippteoreetikuid, kes analüüsivad elu piiri peal, ja kunstnikke, kes seda seisundit oma loomingus kajastavad. Osalema kutsutuid. Piiripealsuset seoses poliitika, interneti, meediaga, äärealadest.

  9. BBMRI-ERIC as a resource for pharmaceutical and life science industries: the development of biobank-based Expert Centres.

    Science.gov (United States)

    van Ommen, Gert-Jan B; Törnwall, Outi; Bréchot, Christian; Dagher, Georges; Galli, Joakim; Hveem, Kristian; Landegren, Ulf; Luchinat, Claudio; Metspalu, Andres; Nilsson, Cecilia; Solesvik, Ove V; Perola, Markus; Litton, Jan-Eric; Zatloukal, Kurt

    2015-07-01

    Biological resources (cells, tissues, bodily fluids or biomolecules) are considered essential raw material for the advancement of health-related biotechnology, for research and development in life sciences, and for ultimately improving human health. Stored in local biobanks, access to the human biological samples and related medical data for transnational research is often limited, in particular for the international life science industry. The recently established pan-European Biobanking and BioMolecular resources Research Infrastructure-European Research Infrastructure Consortium (BBMRI-ERIC) aims to improve accessibility and interoperability between academic and industrial parties to benefit personalized medicine, disease prevention to promote development of new diagnostics, devices and medicines. BBMRI-ERIC is developing the concept of Expert Centre as public-private partnerships in the precompetitive, not-for-profit field to provide a new structure to perform research projects that would face difficulties under currently established models of academic-industry collaboration. By definition, Expert Centres are key intermediaries between public and private sectors performing the analysis of biological samples under internationally standardized conditions. This paper presents the rationale behind the Expert Centres and illustrates the novel concept with model examples.

  10. DNA fingerprinting by ERIC-PCR for comparing Listeria spp. strains isolated from different sources in San Luis: Argentina Caracterización molecular por ERIC-PCR de cepas de Listeria spp. aisladas de diversos orígenes en San Luis: Argentina

    Directory of Open Access Journals (Sweden)

    A. Laciar

    2006-04-01

    Full Text Available In this study, a total of 24 Listeria spp. strains were analyzed. Twenty-two isolates were obtained in San Luis (Argentina from human, animal, and food samples. Two types of strains, Listeria monocytogenes CLIP 22762 and Listeria innocua CLIP 74915, were included as reference strains. All isolates were biochemically identified and characterized by serotyping, phage typing, and amplification of the flaA gene by polymerase chain reaction (PCR. Repetitive intergenic consensus (ERIC sequence-based PCR was used to generate DNA fingerprints. On the basis of ERIC-PCR fingerprints, Listeria spp. strains were divided into three major clusters matching origin of isolation. ERIC-PCR fingerprints of human and animal isolates were different from those of food isolates. In addition, groups I and II included ten L. monocytogenes strains, and only one Listeria seeligeri strain. Group III included nine L. innocua strains and four L. monocytogenes strains. Computer evaluation of ERIC-PCR fingerprints allowed discrimination between the tested serotypes 1/2b, 4b, 6a, and 6b within each major cluster. The index of discrimination calculated was 0.94. This study suggests that the ERIC-PCR technique provides an alternative method for the identification of Listeria species and the discrimination of strains within one species.En este estudio se analizaron 24 cepas de Listeria spp. De ellas, 22 fueron obtenidas en San Luis (Argentina, a partir de muestras humanas, de animales y alimentos. Se incluyeron 2 cepas de referencia Listeria monocytogenes CLIP 22762 y Listeria innocua CLIP 74915. Todos los aislamientos fueron identificados bioquímicamente y caracterizados por serotipificación, fagotipificación y detección del gen flaA por reacción en cadena de la polimerasa (PCR. Se generaron perfiles de bandas de ADN mediante la amplificación de secuencias repetitivas de consenso intergénico de enterobacterias (ERIC-PCR. De acuerdo a los resultados obtenidos por ERIC

  11. DSM-5 and ADHD - an interview with Eric Taylor.

    Science.gov (United States)

    Taylor, Eric

    2013-09-12

    In this podcast we talk to Prof Eric Taylor about the changes to the diagnosis of Attention Deficit Hyperactivity Disorder (ADHD) in DSM-5 and how these changes will affect clinical practice. The podcast for this interview is available at: http://www.biomedcentral.com/sites/2999/download/Taylor.mp3.

  12. Insight into the genomic diversity and relationship of Astragalus glycyphyllos symbionts by RAPD, ERIC-PCR, and AFLP fingerprinting.

    Science.gov (United States)

    Gnat, Sebastian; Małek, Wanda; Oleńska, Ewa; Trościańczyk, Aleksandra; Wdowiak-Wróbel, Sylwia; Kalita, Michał; Wójcik, Magdalena

    2015-11-01

    We assessed the genomic diversity and genomic relationship of 28 Astragalus glycyphyllos symbionts by three methodologies based on PCR reaction, i.e., RAPD, ERIC-PCR, and AFLP. The AFLP method with one PstI restriction enzyme and selective PstI-GC primer pair had a comparable discriminatory power as ERIC-PCR one and these fingerprinting techniques distinguished among the studied 28 A. glycyphyllos symbionts 18 and 17 genomotypes, respectively. RAPD method was less discriminatory in the genomotyping of rhizobia analyzed and it efficiently resolved nine genomotypes. The cluster analysis of RAPD, ERIC-PCR, and AFLP profiles resulted in a generally similar grouping of the test strains on generated dendrograms supporting a great potential of these DNA fingerprinting techniques for study of genomic polymorphism and evolutionary relationship of A. glycyphyllos nodulators. The RAPD, ERIC-PCR, and AFLP pattern similarity coefficients between A. glycyphyllos symbionts studied was in the ranges 8-100, 18-100, and 23-100%, respectively.

  13. GETTING TO KNOW YOU. ERIC PASLAY.

    Science.gov (United States)

    Rosenfeld, Cheryl A

    2017-03-01

    If you're a country music fan, you've probably heard of Eric Paslay; 33, a Nashville-based platinum-selling singer/songwriter. After starting to play guitar at age 15, Paslay knew by 18 that music was his path. In 2011, he signed with EMI Records Nashville, and since then he has had five number one hits, including four recorded by other artists such as Rascal Flatts as well as "Friday Night," the lead single from his self-titled debut album. His latest album, "Dressed in Black," includes the single "Angels in This Town."

  14. Eric Stahlberg Named to FCW’s Federal 100 | FNLCR Staging

    Science.gov (United States)

    Eric Stahlberg, Ph.D., director of high-performance computing at the Frederick National Lab, has been named one of FCW‘s Federal 100 for his work in predictive oncology and his role in the collaboration between the National Cancer Institute and the

  15. The World War II Homefront: An ERIC/ChESS Sample.

    Science.gov (United States)

    Pinhey, Laura

    2002-01-01

    Provides citations with abstracts from the ERIC database focusing on the U.S. homefront during World War II. Includes background information and teaching materials on topics such as popular music from 1941-1945, propaganda directed towards women, and learning about Japanese American internment. (CMK)

  16. Q & A with Ed Tech Leaders: Interview with Eric Chiang

    Science.gov (United States)

    Viner, Mark; Shaughnessy, Michael F.

    2016-01-01

    The authors present this interview with Eric Chiang, Associate Professor of Economics, Director of Instructional Technology, and Technology Director for the Online MBA Program at Florida Atlantic University. He has authored 26 peer-reviewed research publications and is the author of "CoreEconomics," an economic principles textbook now in…

  17. Systems Theory and the Earth Systems Approach in Science Education. ERIC Digest.

    Science.gov (United States)

    Lee, Hyongyong

    The systems approach provides a framework for integrating different scientific disciplines. This approach is used often in Earth Systems Education. This ERIC Digest describes the systems theory and its influence on science education. (Contains 16 references.) (YDS)

  18. Eric Davidson and deep time.

    Science.gov (United States)

    Erwin, Douglas H

    2017-10-13

    Eric Davidson had a deep and abiding interest in the role developmental mechanisms played in generating evolutionary patterns documented in deep time, from the origin of the euechinoids to the processes responsible for the morphological architectures of major animal clades. Although not an evolutionary biologist, Davidson's interests long preceded the current excitement over comparative evolutionary developmental biology. Here I discuss three aspects at the intersection between his research and evolutionary patterns in deep time: First, understanding the mechanisms of body plan formation, particularly those associated with the early diversification of major metazoan clades. Second, a critique of early claims about ancestral metazoans based on the discoveries of highly conserved genes across bilaterian animals. Third, Davidson's own involvement in paleontology through a collaborative study of the fossil embryos from the Ediacaran Doushantuo Formation in south China.

  19. Physics and medicine: at Erice the new perspectives of an ancient cooperation

    CERN Multimedia

    2004-01-01

    From April the 15th to the 17th, at Ettore Majorana Foundation in Erice, in the context of the International School on Physics and Industry, there will be a congress entitled "Particle accelerators and detectors: from physics to medicine".

  20. Freedom of Speech: A Clear and Present Need to Teach. ERIC Report.

    Science.gov (United States)

    Boileau, Don M.

    1983-01-01

    Presents annotations of 21 documents in the ERIC system on the following subjects: (1) theory of freedom of speech; (2) theorists; (3) research on freedom of speech; (4) broadcasting and freedom of speech; and (5) international questions of freedom of speech. (PD)

  1. Eric's Journey: A Restructured School's Inclusion Program and a Student with Disabilities.

    Science.gov (United States)

    Richardson, Don H.

    1998-01-01

    Profiles a Milford, Connecticut, middle school's efforts to help Eric Kowalchick, a developmentally disabled adolescent, develop life skills and friendships, prepare for work, pursue school and community club memberships, and attend high school classes. The school's mainstreaming program is a success, thanks to an institutional mission understood…

  2. Eric Bach : ilustrador de Luis de Góngora

    Directory of Open Access Journals (Sweden)

    María Dolores Antigüedad del Castillo Olivares

    1991-01-01

    Full Text Available El pintor holandés Eric Bach [Eríurt (Alemania 1911] ha mostrado durante el año 1991 sus obras como ilustrador en sendas exposiciones celebradas en Córdoba y Madrid. El artista que reside indistintamente en Munich y Barcelona, expuso las ilustraciones que ha realizado para la edición en alemán de Los veinticuatro sonetos amorosos, heroicos y fúnebres de don Luis de Góngora, edición hecha por encargo del Sr. Rüdiger Kampmann de Munich.

  3. Eric Hobsbawm y su lectura marxista de la historia

    Directory of Open Access Journals (Sweden)

    Pilatowsky, Mauricio

    2014-06-01

    Full Text Available This paper presents a brief survey of the contributions made by the historian Eric Hobsbawm to the field of History and his Marxist stance, both in his academic work and political practice. According to the author, the circumstances in which the researchers live are determinant to their study; hence this analysis includes a review of his biography. This perspective discusses his interpretation of Marx and Marxism, his understanding of History, his militancy in the Communist Party, his Jewish identity, and how he addresses nationalism in relation to the study of capitalism.En este ensayo se presenta un breve estudio de las aportaciones del historiador Eric Hobsbawm en el campo de la historia y de sus posturas marxistas; tanto en su trabajo académico como en su práctica política. El análisis incluye una revisión de su biografía ya que según el autor los investigadores y su manera de investigar responden a las circunstancias que les toca vivir. Desde esta perspectiva se aborda su interpretación de Marx y del marxismo, su forma de entender la historia, su militancia en el Partido Comunista, su identidad judía y el tratamiento del nacionalismo en su relación con el estudio del capitalismo.

  4. Trading studies of a very large hadron collider

    International Nuclear Information System (INIS)

    Ruggiero, A.G.

    1996-01-01

    The authors have shown that the design of the ELOISATRON can be approached in five separate steps. In this report they deal with the two major issues of the collider: the size and the strength of the superconducting magnets. The reference design of the SSC calls for a collider circumference of 86 km. It represents the largest size that until recently was judged feasible. The reference design of the LHC requires a bending field of 9 Tesla, that industries are presently determined to demonstrate. Clearly the large size of the project presents problem with magnet tolerances, and collider operation and management. The high field of the superconducting magnets needs to be demonstrated, and the high-field option in excess of 9 Tesla requires extensive research and development. It is obvious from the start that, if the ELOISATRON has to allow large beam energies, the circumference has also to be larger than that of the SSC, probably of few hundred kilometers. On the other end, Tevatron, RHIC and SSC type of superconducting magnets have been built and demonstrated on a large scale and proven to be cost effective and reliable. Their field, nevertheless, hardly can exceed a value of 7.5 Tesla, without major modifications that need to be studied. The LHC type of magnets may be capable of 9 Tesla, but they are being investigated presently by the European industries. It is desired that if one wants to keep the size of the ring under reasonable limits, a somewhat higher bending field is required for the ELOISATRON, especially if one wants also to take advantage of the synchrotron radiation effects. A field value of 13 Tesla, twice the value of the SSC superconducting magnets, has recently been proposed, but it clearly needs a robust program of research and development. This magnet will not probably be of the RHIC/SSC type and not even of the LHC type. It will have to be designed and conceived anew. In the following they examine two possible approaches. In the first approach

  5. Eric Davidson, his philosophy, and the history of science.

    Science.gov (United States)

    Deichmann, Ute

    2017-10-16

    Eric Davidson, a passionate molecular developmental biologist and intellectual, believed that conceptual advances in the sciences should be based on knowledge of conceptual history. Convinced of the superiority of a causal-analytical approach over other methods, he succeeded in successfully applying this approach to the complex feature of organismal development by introducing the far-reaching concept of developmental Gene Regulatory Networks. This essay reviews Davidson's philosophy, his support for the history of science, and some aspects of his scientific personality.

  6. Fans of Columbine shooters Eric Harris and Dylan Klebold

    OpenAIRE

    Andrew Ryan Rico

    2015-01-01

    On April 20, 1999, Eric Harris and Dylan Klebold murdered 12 students and one teacher at Columbine High School in Littleton, Colorado, in what was then the deadliest school shooting in American history. Despite causing a national panic and serving as a flash point for larger narratives on bullying, gun control, and media violence, both boys have gained active online fans. These fandoms dedicated to the Columbine shooters are widely referred to as dark examples of Internet communities, while t...

  7. Eric Hobsbawm, sociólogo do milenarismo campesino Eric Hobsbawm, sociologist of peasant millenarianism

    Directory of Open Access Journals (Sweden)

    Michael Löwy

    2010-01-01

    Full Text Available Graças à problemática do milenarismo, a historiografia de Eric Hobsbawm integra toda a riqueza da subjetividade sociocultural, a profundidade das crenças, sentimentos e emoções em sua análise dos acontecimentos históricos, que não são mais, nessa perspectiva, percebidos simplesmente como produtos do jogo "objetivo" das forças econômicas ou políticas. Ainda distinguindo cuidadosamente os milenarismos primitivos dos revolucionários modernos, não deixa de mostrar sua afinidade eletiva. Isso não quer dizer que todos os movimentos revolucionários sejam milenaristas em sentido estrito ou, pior todavia, que respondam a um quiliasmo de tipo primitivo. Isso não impede afirmar que a afinidade entre os dois seja um fato fundamental na história das revoltas camponesas contra a modernização capitalista. Trata-se de uma das hipóteses de investigação mais interessantes esquematizadas em seus trabalhos desta época. Hobs-bawm ilustra seus propósitos com dois estudos de caso apaixonantes: o anarquismo rural na Andaluzia e as ligas camponesas da Sicília, os dois surgidos em fins do século XIX com prolongamentos no XX.Thanks to the problematic of millenarianism, Eric Hobsbawm's historiography incorporates all the richness of socio-cultural subjectivity - the depth of beliefs, feelings and emotions - into his analysis of historical events, which, from this viewpoint, are no longer perceived simply as products of the "objective" interplay of economic or political forces. Although he makes a careful distinction between primitive millenarianisms and modern revolutionary movements, Hobsbawm nevertheless shows their elective affinity between them. This does not mean that all revolutionary movements are millenarian in the strict sense or - which is even worse - that they are connected to a primitive type of chiliasm. All the same, the affinity between them is a basic fact in the history of peasant revolts against capitalist modernization. This

  8. Cumulative Index of ERIC Resources in Counseling and Personnel Services. 1967-1976.

    Science.gov (United States)

    Walz, Garry R.; And Others

    This cumulative index contains over 5500 titles from the ERIC collection, and represents all the document input from the Clearinghouse on Counseling and Personnel Services between 1967-1976. Topics cover theoretical and practical information in all areas of counseling and guidance as well as in drug abuse, aging, sexuality and death. Directions…

  9. Encore: A Selction of Articles from ERIC/ECE Newsletters (Jan. 1971-Dec. 1972).

    Science.gov (United States)

    ERIC Clearinghouse on Early Childhood Education, Champaign, IL.

    This compilation of articles from newsletters issued by the ERIC Clearinghouse on Early Childhood Education, (January 1971 - December 1972) includes a wide variety of topics such as: teachers' developmental stages, family day care in Pasadena, television violence, children's altruistic lying, and the Home Start program. Also included is a complete…

  10. How To Use the SilverPlatter Software To Search the ERIC CD ROM.

    Science.gov (United States)

    Merrill, Paul F.

    This manual provides detailed instructions for using SilverPlatter software to search the ERIC CD ROM (Compact Disk Read Only Memory), a large bibliographic database relating to education which contains reference information on numerous journal articles from over 750 journals cited in the "Current Index to Journals in Education" (CIJE),…

  11. Eric Clapton et Pete Postlethwaite sur la liste des honneurs de fin d'annee

    CERN Multimedia

    2003-01-01

    "Le guitariste Eric Clapton, l'acteur Pete Postlethwaite et l'un des peres de l'internet Tim Berners-Lee figurent, aux cotes du XV d'Angleterre, sur la liste de fin d'annee des principales personnalites distinguees par la reine Elizabeth II" (1/2 page).

  12. Molecular typing of uropathogenic E. coli strains by the ERIC-PCR method.

    Science.gov (United States)

    Ardakani, Maryam Afkhami; Ranjbar, Reza

    2016-04-01

    Escherichia coli (E. coli) is the most common cause of urinary infections in hospitals. The aim of this study was to evaluate the ERIC-PCR method for molecular typing of uropathogenic E. coli strains isolated from hospitalized patients. In a cross sectional study, 98 E. coli samples were collected from urine samples taken from patients admitted to Baqiyatallah Hospital from June 2014 to January 2015. The disk agar diffusion method was used to determine antibiotic sensitivity. DNA proliferation based on repetitive intergenic consensus was used to classify the E. coli strains. The products of proliferation were electrophoresed on 1.5% agarose gel, and their dendrograms were drawn. The data were analyzed by online Insillico software. The method used in this research proliferated numerous bands (4-17 bands), ranging from 100 to 3000 base pairs. The detected strains were classified into six clusters (E1-E6) with 70% similarity between them. In this study, uropathogenic E. coli strains belonged to different genotypic clusters. It was found that ERIC-PCR had good differentiation power for molecular typing of uropathogenic E. coli strains isolated from the patients in the study.

  13. Eric Woods - A lone radiographer at the Normandy landings

    Energy Technology Data Exchange (ETDEWEB)

    Barrett, Jean [British Society for the History of Radiology (United Kingdom); Ferris, Christine [International Development Facilitator, Robert Winston Building, Faculty of Health and Wellbeing, Sheffield Hallam University, Sheffield S10 2BP (United Kingdom)], E-mail: c.m.ferris@shu.ac.uk

    2009-12-15

    Although much of the activity around D-day is recorded many of the support services such as radiography do not feature. This account of a radiographer at the Normandy landings gives an insight into the everyday work of a lone radiographer in the Armed Forces in the 1940s. This work is the product of an oral history taken by Jean Barrett in accordance with the acknowledged ethical requirements of oral history. Eric Wood has given his permission for the publication of his stories. The work was presented at the conference for the British Society for the History of Radiology 2008 (Sheffield)

  14. Eric Woods - A lone radiographer at the Normandy landings

    International Nuclear Information System (INIS)

    Barrett, Jean; Ferris, Christine

    2009-01-01

    Although much of the activity around D-day is recorded many of the support services such as radiography do not feature. This account of a radiographer at the Normandy landings gives an insight into the everyday work of a lone radiographer in the Armed Forces in the 1940s. This work is the product of an oral history taken by Jean Barrett in accordance with the acknowledged ethical requirements of oral history. Eric Wood has given his permission for the publication of his stories. The work was presented at the conference for the British Society for the History of Radiology 2008 (Sheffield).

  15. Reproducible diagnosis of chronic lymphocytic leukemia by flow cytometry: An European Research Initiative on CLL (ERIC) & European Society for Clinical Cell Analysis (ESCCA) Harmonisation project.

    Science.gov (United States)

    Rawstron, Andy C; Kreuzer, Karl-Anton; Soosapilla, Asha; Spacek, Martin; Stehlikova, Olga; Gambell, Peter; McIver-Brown, Neil; Villamor, Neus; Psarra, Katherina; Arroz, Maria; Milani, Raffaella; de la Serna, Javier; Cedena, M Teresa; Jaksic, Ozren; Nomdedeu, Josep; Moreno, Carol; Rigolin, Gian Matteo; Cuneo, Antonio; Johansen, Preben; Johnsen, Hans E; Rosenquist, Richard; Niemann, Carsten Utoft; Kern, Wolfgang; Westerman, David; Trneny, Marek; Mulligan, Stephen; Doubek, Michael; Pospisilova, Sarka; Hillmen, Peter; Oscier, David; Hallek, Michael; Ghia, Paolo; Montserrat, Emili

    2018-01-01

    The diagnostic criteria for CLL rely on morphology and immunophenotype. Current approaches have limitations affecting reproducibility and there is no consensus on the role of new markers. The aim of this project was to identify reproducible criteria and consensus on markers recommended for the diagnosis of CLL. ERIC/ESCCA members classified 14 of 35 potential markers as "required" or "recommended" for CLL diagnosis, consensus being defined as >75% and >50% agreement, respectively. An approach to validate "required" markers using normal peripheral blood was developed. Responses were received from 150 participants with a diagnostic workload >20 CLL cases per week in 23/150 (15%), 5-20 in 82/150 (55%), and 97% concordance with current approaches. A pilot study to validate staining quality was completed in 11 centers. Markers considered as "required" for the diagnosis of CLL by the participants in this study (CD19, CD5, CD20, CD23, Kappa, and Lambda) are consistent with current diagnostic criteria and practice. Importantly, a reproducible approach to validate and apply these markers in individual laboratories has been identified. Finally, a consensus "recommended" panel of markers to refine diagnosis in borderline cases (CD43, CD79b, CD81, CD200, CD10, and ROR1) has been defined and will be prospectively evaluated. © 2017 International Clinical Cytometry Society. © 2017 The Authors. Cytometry Part B: Clinical Cytometry published by Wiley Periodicals, Inc. on behalf of International Clinical Cytometry Society.

  16. Das US-Fachinformationssystem ERIC und die Entwicklung eines Fachinformationssystems Bildung in der Bundesrepublik Deutschland (The American Subject Information System ERIC and the Development of an Information System on Education in the German Federal Republic).

    Science.gov (United States)

    Nachrichten fur Dokumentation, 1982

    1982-01-01

    In order to further develop West German information services for education, it is suggested that the ERIC structural model--a coordinating central office and a network of clearinghouses--be developed as a continuation of the existing "Dokumentationsring Padagogik" (DOPAED) documentation service. (16 references) (EJS)

  17. EMSODEV and EPOS-IP: key findings for effective management of EU research infrastructure projects

    Science.gov (United States)

    Materia, Paola; Bozzoli, Sabrina; Beranzoli, Laura; Cocco, Massimo; Favali, Paolo; Freda, Carmela; Sangianantoni, Agata

    2017-04-01

    EMSO (European Multidisciplinary Seafloor and water-column Observatory, http://www.emso-eu.org) and EPOS (European Plate Observing System, https://www.epos-ip.org) are pan-European Research Infrastructures (RIs) in the ESFRI 2016 Roadmap. EMSO has recently become an ERIC (European Research Infrastructure Consortium), whilst EPOS application is in progress. Both ERICs will be hosted in Italy and the "Representing Entity" is INGV. EMSO consists of oceanic environment observation systems spanning from the Arctic through the Atlantic and Mediterranean, to the Black Sea for long-term, high-resolution, real-time monitoring of natural and man-induced processes such as hazards, climate, and marine ecosystems changes to study their evolution and interconnections. EPOS aims at creating a pan-European infrastructure for solid Earth science to support a safe and sustainable society. EPOS will enable innovative multidisciplinary research for a better understanding of Earth's physical and chemical processes controlling earthquakes, volcanic eruptions, ground instability, tsunami, and all those processes driving tectonics and Earth's surface dynamics. Following the conclusion of their Preparatory Phases the two RIs are now in their Implementation Phase still supported by the EC through the EMSODEV and EPOS-IP projects, both run by dedicated Project Management Offices at INGV with sound experience in EU projects. EMSODEV (H2020 project, 2015-2018) involves 11 partners and 9 associate partners and aims at improving the harmonization among the EMSO ERIC observation systems through the realization of EMSO Generic Instrument Modules (EGIMs), and a Data Management Platform (DMP) to implement interoperability and standardization. The DMP will provide access to data from all EMSO nodes, providing a unified, homogeneous, infrastructure-scale and user-oriented platform integrated with the increased measurement capabilities and functions provided by the EGIMs. EPOS IP (H2020 project, 2015

  18. Eric Kandel's Reductionism in Art and Brain Science - Bridging the Two Cultures.

    Science.gov (United States)

    Bilsky, Ed

    2017-01-01

    Reductive art is a term to describe an artistic style or an aesthetic, rather than an art movement. It is stripping down as a new way of seeing. Movements and other terms that are sometimes associated with reductive art include abstract art, minimalism, ABC art, anti-illusionism, cool art, and rejective art. Eric Kandel's fifth book focuses on reductionism as the principle guiding an ongoing dialogue between the worlds of science and art .

  19. Adamson-Eric 100 : XX sajandi kunsti- ja kultuurilugu ühe inimsaatuse kaudu / Ülle Kruus

    Index Scriptorium Estoniae

    Kruus, Ülle

    2002-01-01

    Näitus "Adamson-Eric 100" Eesti Kunstimuuseumi Rüütelkonna hoones ja Adamson-Ericu muuseumis. Koostajad Ülle Kruus, Kersti Koll, Hanno Soans, kujundajad Leonhard Lapin (EKM), Jaak Soans (Adamson-Ericu muuseum). Adamson-Ericu teosed väljaspool Eestit ja Eestisse tagasi jõudnud tööd

  20. Reaction-Based Reactive Transport Modeling of Iron Reduction and Uranium Immobilization at Area 2 of the NABIR Field Research Center, Subproject to Co-PI Eric E. Roden. Final Report

    International Nuclear Information System (INIS)

    Roden, Eric E.

    2011-01-01

    This report summarizes research conducted in conjunction with a project entitled 'Reaction-Based Reactive Transport Modeling of Iron Reduction and Uranium Immobilization at Area 2 of the NABIR Field Research Center', which was funded through the Integrative Studies Element of the former NABIR Program (now the Environmental Remediation Sciences Program) within the Office of Biological and Environmental Research. Dr. William Burgos (The Pennsylvania State University) was the overall PI/PD for the project, which included Brian Dempsey (Penn State), Gour-Tsyh (George) Yeh (Central Florida University), and Eric Roden (formerly at The University of Alabama, now at the University of Wisconsin) as separately-funded co-PIs. The project focused on development of a mechanistic understanding and quantitative models of coupled Fe(III)/U(VI) reduction in FRC Area 2 sediments. The work builds on our previous studies of microbial Fe(III) and U(VI) reduction, and was directly aligned with the Scheibe et al. ORNL FRC Field Project at Area 2.

  1. CAS Accelerator Physics held in Erice, Italy

    CERN Multimedia

    CERN Accelerator School

    2013-01-01

    The CERN Accelerator School (CAS) recently organised a specialised course on Superconductivity for Accelerators, held at the Ettore Majorana Foundation and Centre for Scientific Culture in Erice, Italy from 24 April-4 May, 2013.   Photo courtesy of Alessandro Noto, Ettore Majorana Foundation and Centre for Scientific Culture. Following a handful of summary lectures on accelerator physics and the fundamental processes of superconductivity, the course covered a wide range of topics related to superconductivity and highlighted the latest developments in the field. Realistic case studies and topical seminars completed the programme. The school was very successful with 94 participants representing 23 nationalities, coming from countries as far away as Belorussia, Canada, China, India, Japan and the United States (for the first time a young Ethiopian lady, studying in Germany, attended this course). The programme comprised 35 lectures, 3 seminars and 7 hours of case study. The case studies were p...

  2. Covert radar and signals interception the secret career of Eric Ackermann

    CERN Document Server

    Hayson, David

    2014-01-01

    Of German stock dating back to 1530 in Saxony, Eric George Ackermann GM was born on the Isle of Wight in 1919 and became a leading figure in the world of signals and electronic intelligence. As a Junior Scientific Officer at the Telecommunication Research Establishment, Boscombe Down, with an honorary commission in the Royal Air Force, he made numerous flights over occupied territory searching for, monitoring and destroying Germany's Wuerzburg, Knickebein and X Band radar systems. Much of his research was passed to the highest levels of wartime government, and was highly prized, ensuring that

  3. Use of the Spanish Language in the United States: Trends, Challenges, and Opportunities. ERIC Digest.

    Science.gov (United States)

    Santiestevan, Stina

    This ERIC digest examines the Spanish-speaking group in the United States, its growth through net immigration and natural increase, and its eventual decline as speakers shift to English. The Hispanic population is growing rapidly, but data suggest that U.S. Hispanics do learn and speak English. Research predicts that by the year 2001 the…

  4. A High School Student's Bill of Rights. Teaching Resources in the ERIC Database (TRIED) Series.

    Science.gov (United States)

    Gottlieb, Stephen S.

    Designed to tap the rich collection of instructional techniques in the ERIC database, this compilation of lesson plans focuses on teaching high school students their Constitutional rights and responsibilities. The 40 lesson plans in the book cover the courts and basic rights, the rights of criminal suspects, the rights of minors and education law,…

  5. Conferencias de padres-educadores: Sugerencias para los padres (Parent-Teacher Conferences: Suggestions for Parents). ERIC Digest.

    Science.gov (United States)

    Clark, Ann-Marie

    Parent-teacher conferences sometimes become a cause for concern for everyone involved. This Spanish-language ERIC Digest outlines ways to improve communication during parent-teacher conferences. Suggestions are offered to help parents participate more effectively in conferences, including identifying what is being done to help a child overcome a…

  6. Nobel Prize Recipient Eric Betzig Presents Lecture on Efforts to Improve High-Resolution Microscopy | Poster

    Science.gov (United States)

    Eric Betzig, Ph.D., a 2014 recipient of the Nobel Prize in Chemistry and a scientist at Janelia Research Campus (JRC), Howard Hughes Medical Institute, in Ashburn, Va., visited NCI at Frederick on Sept. 10 to present a Distinguished Scientist lecture and discuss the latest high-resolution microscopy techniques. Betzig co-invented photoactivation localization microscopy (PALM)

  7. Balancing Biography and Institutional History: Eric Worrell’s Australian Reptile Park

    Directory of Open Access Journals (Sweden)

    Nancy Cushing

    2009-11-01

    Full Text Available When a young naturalist opened his new wildlife park at Wyoming on the NSW Central Coast in the late 1950s, he gave it his own name: Eric Worrell’s Australian Reptile Park. Through the park, Worrell made a significant contribution to environmental education, the development of knowledge of captive animal care and display and the provision of antivenoms for the bites of a range of dangerous creatures. More than this, it was the geographic and emotional centre of Worrell’s world: the fulfilment of a childhood dream, a home for his family and a site for forming new personal and professional relationships. In preparation for the jubilee of the park, its history is being written by two academics from the University of Newcastle. An attractive means of creating the necessary narrative structure and human interest to ensure the wide appeal of this history is to follow Worrell’s lead and place his life at the centre of this institutional history. This is the direction suggested by the written sources on the park and it is accentuated by many of our oral informants who organise their memories of the park around Worrell. To what extent can an institutional history be a biography of the person at the heart of that institution? Is it possible to disentangle the life from the institution? This article offers some preliminary answers to these questions through a case study of the writing of a history of Eric Worrell’s Australian Reptile Park.

  8. Las ericáceas de la vertiente pacífica de Nariño, Colombia

    Directory of Open Access Journals (Sweden)

    Nelson R. Salinas

    2005-01-01

    La mayor riqueza de especies y endemismos se presentó entre 1.000 y 1.600 m de altitud, con 45 especies. Los resultados obtenidos muestran que la vertiente pacífica del departamento de Nariño, Colombia, es la región de América con mayor número de especies de ericáceas por unidad de área.

  9. ERic Acute StrokE Recanalization: A study using predictive analytics to assess a new device for mechanical thrombectomy.

    Science.gov (United States)

    Siemonsen, Susanne; Forkert, Nils D; Bernhardt, Martina; Thomalla, Götz; Bendszus, Martin; Fiehler, Jens

    2017-08-01

    Aim and hypothesis Using a new study design, we investigate whether next-generation mechanical thrombectomy devices improve clinical outcomes in ischemic stroke patients. We hypothesize that this new methodology is superior to intravenous tissue plasminogen activator therapy alone. Methods and design ERic Acute StrokE Recanalization is an investigator-initiated prospective single-arm, multicenter, controlled, open label study to compare the safety and effectiveness of a new recanalization device and distal access catheter in acute ischemic stroke patients with symptoms attributable to acute ischemic stroke and vessel occlusion of the internal cerebral artery or middle cerebral artery. Study outcome The primary effectiveness endpoint is the volume of saved tissue. Volume of saved tissue is defined as difference of the actual infarct volume and the brain volume that is predicted to develop infarction by using an optimized high-level machine learning model that is trained on data from a historical cohort treated with IV tissue plasminogen activator. Sample size estimates Based on own preliminary data, 45 patients fulfilling all inclusion criteria need to complete the study to show an efficacy >38% with a power of 80% and a one-sided alpha error risk of 0.05 (based on a one sample t-test). Discussion ERic Acute StrokE Recanalization is the first prospective study in interventional stroke therapy to use predictive analytics as primary and secondary endpoint. Such trial design cannot replace randomized controlled trials with clinical endpoints. However, ERic Acute StrokE Recanalization could serve as an exemplary trial design for evaluating nonpivotal neurovascular interventions.

  10. Entrevista com Eric McLuhan

    Directory of Open Access Journals (Sweden)

    McLuhan, Eric

    2011-01-01

    Full Text Available Marshall McLuhan faria 100 anos em 2011. Para marcar esta data, que já provocou uma recente revisitação à obra do teórico, o XI Seminário Internacional da Comunicação, promovido pela PUCRS, destacou temas como as relações do homem com as tecnologias e os efeitos psicológicos das mídias para nortear às discussões dos três dias de evento. Mas se engana que acredita que entender a obra mcluhiana é tarefa fácil. Mesmo tendo se dedicado com afinco a explicar metáforas como ‘o meio é a mensagem’ e ‘aldeia global’, McLuhan nunca chegou a ser completamente entendido. Ou as pessoas não sedavam ao trabalho de entendê-lo, ou, simplesmente, não conseguiam enxergar as mudanças que estavam acontecendo com a mesma clareza que o pesquisador. Numa tentativa não só de entender a obra do ‘profeta da globalização’, mas de ampliar os entendimentos sobre as tecnologias e as extensões do homem, Eric McLuhan, filho do teórico, participou como palestrante do Seminário para falar, entre outros assuntos, da percepção acadêmica quanto a obra de seu pai, além de introduzir novas ideias sobre televisão, globalização e ecologia

  11. Reflections on Sven-Eric Liedman’s Marx-Biography “A World to Win: The Life and Works of Karl Marx”

    Directory of Open Access Journals (Sweden)

    Christian Fuchs

    2018-05-01

    Full Text Available The English translation of Sven-Eric Liedman’s Marx-biography A World to Win: The Life and Works of Karl Marx was published two weeks before Marx’s bicentenary. This article presents reflections on Liedman’s book and asks how one should best write biographically about Marx. The paper compares Liedman’s biography to the Marx-biographies written by Jonathan Sperber (Karl Marx: A Nineteenth-Century Life and Gareth Stedman-Jones (Karl Marx: Greatness and Illusion. A biography is a way of repeating a person’s life, works and age in a process of reconstruction and retelling. The question that arises is how to write a biography as a dialectical text. Sven-Eric Liedman: A World to Win: The Life and Works of Karl Marx. London: Verso, London, 2018. 768 pages., £35.00 hbk. ISBN 9781786635044

  12. Genotipificación de aislamientos de Bartonella bacilliformis por amplificación de elementos repetitivos mediante el uso de REP-PCR y ERIC-PCR

    Directory of Open Access Journals (Sweden)

    Carlos Padilla R

    2003-07-01

    Full Text Available Objetivos: Genotipificar los aislamientos de Bartonella bacilliformis a través de la amplificación de elementos repetitivos mediante el uso de ERIC-PCR y REP-PCR, y determinar si existe variabilidad genética entre aislamientos de varias zonas endémicas. Materiales y Métodos: Se evaluaron mediante el uso del ERIC-PCR y REP-PCR 17 aislamientos de B. bacilliformis de Lima, Cusco y Ancash. Los aislamientos fueron realizados durante los años 1998 y 1999. Para el análisis de los patrones de bandas se usó el software GelCompar 4,0. Resultados: Fueron identificados en los 17 aislamientos 10 genotipos. Los genotipos D, E y H fueron detectados en Cusco; mientras que los genotipos B, C, G, J e I en Lima; y el genotipo F en Ancash. Conclusiones: Nuestros resultados sugieren que REP-PCR y ERIC-PCR son métodos útiles para genotipificar aislamientos de B. bacilliformis. La variabilidad genética debe ser tomada en cuenta en estudios epidemiológicos y clínicos de Bartonelosis; así como el desarrollo de nuevas técnicas diagnósticas y de vacunas.

  13. Molecular characterization of Salmonella enterica serotype Enteritidis isolates from food and human samples by serotyping, antimicrobial resistance, plasmid profiling, (GTG5-PCR and ERIC-PCR

    Directory of Open Access Journals (Sweden)

    F. Fardsanei

    2016-11-01

    Full Text Available In recent years, Salmonella enterica serovar Enteritidis has been a primary cause of human salmonellosis in many countries. The major objective of this study was to investigate genetic diversity among Salmonella Enteritidis strains from different origins (food and human by Enterobacterial Repetitive Intergenic Consensus (ERIC -PCR, as well as to assess their plasmid profiling and antimicrobial resistance. A total of 30 Salmonella Enteritidis isolates, 15 from food samples (chicken, lamb, beef and duck meats and 15 from clinical samples were collected in Tehran. Identification of isolates as Salmonella was confirmed by using conventional standard biochemical and serological tests. Multiplex-PCR was used for serotyping of isolates to identify Salmonella Enteritidis. Antimicrobial susceptibility testing to 16 agents founds drug resistance patterns among Salmonella Enteritidis isolates. No resistance was observed to cephalexin, ceftriaxone, ceftazidime and cefotaxime, ciprofloxacin, imipenem or meropenem, chloramphenicol and gentamicin. The highest resistance (96.7% was observed to nitrofurantoin. Seven plasmid profiles (P1–P7 were detected, and a 68-kb plasmid was found in all isolates. Two different primers; ERIC and (GTG5 were used for genotyping, which each produced four profiles. The majority of clinical and food isolates fell into two separate common types (CTs with a similar percentage of 95% by ERIC-PCR. Using primer (GTG5, 29 isolates incorporated in three CTs with 70% of isolates showing a single banding pattern. Limited genetic diversity among human and food isolates of Salmonella Enteritidis may indicate that contaminated foods were possibly the source of human salmonellosis. These results confirmed that ERIC-PCR genotyping has limited discriminatory power for Salmonella Enteritidis of different origin.

  14. ERIC-PCR fingerprinting-based community DNA hybridization to pinpoint genome-specific fragments as molecular markers to identify and track populations common to healthy human guts.

    Science.gov (United States)

    Wei, Guifang; Pan, Li; Du, Huimin; Chen, Junyi; Zhao, Liping

    2004-10-01

    Bacterial populations common to healthy human guts may play important roles in human health. A new strategy for discovering genomic sequences as markers for these bacteria was developed using Enterobacterial Repetitive Intergenic Consensus (ERIC)-PCR fingerprinting. Structural features within microbial communities are compared with ERIC-PCR followed by DNA hybridization to identify genomic fragments shared by samples from healthy human individuals. ERIC-PCR profiles of fecal samples from 12 diseased or healthy human and piglet subjects demonstrated stable, unique banding patterns for each individual tested. Sequence homology of DNA fragments in bands of identical size was examined between samples by hybridization under high stringency conditions with DIG-labeled ERIC-PCR products derived from the fecal sample of one healthy child. Comparative analysis of the hybridization profiles with the original agarose fingerprints identified three predominant bands as signatures for populations associated with healthy human guts with sizes of 500, 800 and 1000 bp. Clone library profiling of the three bands produced 17 genome fragments, three of which showed high similarity only with regions of the Bacteroides thetaiotaomicron genome, while the remainder were orphan sequences. Association of these sequences with healthy guts was validated by sequence-selective PCR experiments, which showed that a single fragment was present in all 32 healthy humans and 13 healthy piglets tested. Two fragments were present in the healthy human group and in 18 children with non-infectious diarrhea but not in eight children with infectious diarrhea. Genome fragments identified with this novel strategy may be used as genome-specific markers for dynamic monitoring and sequence-guided isolation of functionally important bacterial populations in complex communities such as human gut microflora.

  15. The ERICE-score: the new native cardiovascular score for the low-risk and aged Mediterranean population of Spain.

    Science.gov (United States)

    Gabriel, Rafael; Brotons, Carlos; Tormo, M José; Segura, Antonio; Rigo, Fernando; Elosua, Roberto; Carbayo, Julio A; Gavrila, Diana; Moral, Irene; Tuomilehto, Jaakko; Muñiz, Javier

    2015-03-01

    In Spain, data based on large population-based cohorts adequate to provide an accurate prediction of cardiovascular risk have been scarce. Thus, calibration of the EuroSCORE and Framingham scores has been proposed and done for our population. The aim was to develop a native risk prediction score to accurately estimate the individual cardiovascular risk in the Spanish population. Seven Spanish population-based cohorts including middle-aged and elderly participants were assembled. There were 11800 people (6387 women) representing 107915 person-years of follow-up. A total of 1214 cardiovascular events were identified, of which 633 were fatal. Cox regression analyses were conducted to examine the contributions of the different variables to the 10-year total cardiovascular risk. Age was the strongest cardiovascular risk factor. High systolic blood pressure, diabetes mellitus and smoking were strong predictive factors. The contribution of serum total cholesterol was small. Antihypertensive treatment also had a significant impact on cardiovascular risk, greater in men than in women. The model showed a good discriminative power (C-statistic=0.789 in men and C=0.816 in women). Ten-year risk estimations are displayed graphically in risk charts separately for men and women. The ERICE is a new native cardiovascular risk score for the Spanish population derived from the background and contemporaneous risk of several Spanish cohorts. The ERICE score offers the direct and reliable estimation of total cardiovascular risk, taking in consideration the effect of diabetes mellitus and cardiovascular risk factor management. The ERICE score is a practical and useful tool for clinicians to estimate the total individual cardiovascular risk in Spain. Copyright © 2014 Sociedad Española de Cardiología. Published by Elsevier España, S.L.U. All rights reserved.

  16. Futebol, Cultura e Utopia: uma leitura de À procura de Eric, de Ken Loach

    OpenAIRE

    André Luís Reis Fernandes

    2016-01-01

    O presente trabalho tem como objetivo analisar o filme À procura de Eric(2009), do cineasta inglês Ken Loach. A análise procura fundamentar de que forma a narrativa do filme apresenta aspectos formais e conceituais que permitam aproximar os elementos constitutivos do jogo de futebol com possibilidades de explicações do mundo da pós-modernidade pautadas pelo materialismo histórico. Para tal, será necessário compreender a noção de Mapeamento Cognitivo, de Fredric Jameson, visando delimitar de q...

  17. In Praise of Mr. S. Platter and His Marvelous, Magnificent CD ROM Laser Disc Index for ERIC and PSYCHLIT.

    Science.gov (United States)

    Huffman, Robert F.

    These instructions are designed to help patrons of the University of Missouri-Columbia library perform searches on PSYCHLIT, a CD-ROM (compact disc, read only memory) version of the Psych Abstracts database, and a CD-ROM version of the ERIC database, both produced by SilverPlatter Information Services. Basic information is provided about the disk…

  18. Genetic diversity of Mycosphaerella fijiensis in Brazil analyzed using an ERIC-PCR marker.

    Science.gov (United States)

    Silva, G F; Paixão, R D V; Queiroz, C B; Santana, M F; Souza, A; Sousa, N R; Hanada, R E; Gasparotto, L

    2014-09-26

    The Enterobacterial repetitive intergenic consensus (ERIC) marker was used to analyze the genetic variability of Mycosphaerella fijiensis, the causative agent of Black Sigatoka disease in banana plants. A total of 123 isolates were used, which were divided into populations based on their original hosts and collection sites in Brazil. A total of 9 loci were amplified, 77.8% of which were found to be polymorphic. The genetic diversity found in the population was 0.20. Analysis of molecular variance (AMOVA) demonstrated that the highest level of genetic variation is within populations. Cluster analysis revealed three main groups in Brazil, with no correlation between geographic and genetic distance.

  19. Report of the researcher exchange promotion project on the environmental issues in the Asia-Pacific region; Asia/Taiheiyo chiiki kankyo mondai kenkyusha koryu sokushin jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    Proposals have been made for the establishment of a network (ETERNET-APR) linking those involved in the research and development of environmental technology in the Asia-Pacific region in order to limit the environmental impact of industrial activity. By pursuing active exchanges of information and personnel, researchers in environmental technology in the Asia-Pacific region have been making serious efforts to establish such a network. This fiscal year, the Internet Web site of the ETERNET-APR has been created using the data collected to date. This database includes information on some 350 researchers and 200 research projects from seven countries. The first international symposium was successfully held at Environmental Research Institute of Chulalongkorn University in Thailand (ERIC), hosting 200 environmental researchers from 10 countries in the Asia-Pacific region. Tripartite sister laboratories ties among the National Institute for Resources and Environment (NIRE) and three Korean laboratories were forged. The sister laboratory project between ICETT and ERIC is also proving effective. These successes prove that intraregional joint research, the objective of ETERNET-APR, has begun to take shape in this year

  20. Deconstruction in Architecture – Continuous Translation through an Open Project

    Directory of Open Access Journals (Sweden)

    Jovana Tošić

    2017-04-01

    Full Text Available Jacques Derrida developed deconstruction as a way of thinking which constantly examines the nature and possibilities of meaning. The paper analyses spatial-economic, cultural and social context in which deconstructive discourse was translated into architectural discourse. Translation between these two discourses happens vice versa. Deconstructivism emphasizes the formal properties of architecture, like postmodernism, which is the subject of exploration by architects such as Coop Himmelblau, Frank Gehry, Eric Owen Moss, etc. According to some interpretations, the only solution for deconstruction in architectural work is incompleteness, an open project which represents never-ending deconstruction. There are different solutions for open projects, and the article highlights projects by architects mentioned above, which seems to manage to achieve continuous deconstruction in practice.   Article received: December 23, 2016; Article accepted: January 18, 2017; Published online: April 20, 2017 Original scholarly paper How to cite this paper: Tošić, Jovana. "Deconstruction in Architecture – Continuous Translation through an Open Project." AM Journal of Art and Media Studies 20 (2017: 99-107. doi: 10.25038/am.v0i12.170

  1. Is Combat Exposure Predictive of Higher Preoperative Stress in Military Members?

    Science.gov (United States)

    2015-01-26

    Bopp, Eric, Joseph USU Project Number: N12-P16 4 TSNRP Research Priorities that Study or Project Addresses Primary Priority Force Health...of the caregiver Other: Principal Investigator: Bopp, Eric, Joseph USU Project Number: N12-P16 5 Background The preoperative...e.g., diabetes, thyroid disorders), and (c) autoimmune disorders (e.g., Sjogren’s syndrome ). Patients arriving to the Preoperative Teaching Unit

  2. Discriminação de sorovares de Salmonella spp. isolados de carcaças de frango por REP e ERIC-PCR e fagotipagem do sorovar Enteriditis Discrimination of Salmonella serovars isolated from chicken meat by REP and ERIC-PCR and phagotyping of Enteriditis sorovar

    Directory of Open Access Journals (Sweden)

    Iliana Alcocer

    2006-06-01

    Full Text Available Salmonelose é a infecção bacteriana de origem alimentar mais freqüente no Paraná, Brasil, e os surtos estão associados, principalmente, ao consumo de ovos, carne de aves e derivados. Os objetivos deste trabalho foram identificar os sorovares de Salmonella isolados de carcaças de frango e caracterizá-los molecularmente por REP e ERIC-PCR, assim como identificar os fagotipos de Salmonella Enteriditis. Dos 25 isolados de Salmonella spp. analisados, 18 foram identificados como Enteriditis, 4 como Braenderup, 2 como Worthington e 1 como infantis. Dos 18 isolados de Enteriditis, 14 foram PT4, 2 PT4a, 1 PT7 e 1 RDNC, por se tratar de colônia rugosa. REP-PCR forneceu padrão eletroforético distinto de 10 a 13 bandas distribuídas entre 120 e 2072 pb para cada sorovar diferente testado. A ERIC-PCR mostrou um padrão de 4 a 5 bandas entre 180 e 1000 pb e foi menos discriminativa quando comparada à REP-PCR. Os resultados encontrados confirmaram que a fagotipagem é uma ferramenta útil e discriminativa para o sorovar Enteriditis. Apesar do pequeno número de sorovares testados, os resultados sugerem que a REP-PCR parece ser um método atrativo a ser utilizado no futuro para a discriminação preliminar de sorovares de Salmonella.Salmonellosis is the most prevalent bacterial food-borne disease in the State of Paraná, Brazil, and the outbreaks are often associated with consumption of poultry products. The aim of this study was to serotype Salmonella strains isolated from chicken carcasses and characterize them molecularly using REP and ERIC-PCR. The phage types of Salmonella Enteriditis were also identified. Of the 25 Salmonella strains analysed, 18 were identified as Enteriditis, 4 as Braenderup, 2 as Worthington and 1 as infantis. Of the 18 Enteriditis isolates, 14 were PT4, 2 PT4a, 1 PT7 and 1 "reacted, but did not conform" - RDNC. Distinct REP-PCR profiles with 10 to 13 fragments distributed between 120 and 2072 pb were easily obtained for

  3. Project Inner Brick - Colorful Plastic Bricks in Psychotherapy - An Introduction to Methodology

    Directory of Open Access Journals (Sweden)

    Neidert László

    2015-06-01

    Full Text Available PIB is a research project pertaining to the psychotherapeutic potential of Lego bricks. This is based on Lego Group’s own method called Lego Seriousplay and Eric Berne's transactional analysis as a theoretical background. If we see it from the Lego’s aspect, our plan is a training like LSP. It is only alike because of the special application. We made a lot of modifications according to the original methodology. In this document we would like to present details of our research we have been working on for almost two years. The characteristics of our methodology will be illustrated, too.

  4. [Strategies for biobank networks. Classification of different approaches for locating samples and an outlook on the future within the BBMRI-ERIC].

    Science.gov (United States)

    Lablans, Martin; Kadioglu, Dennis; Mate, Sebastian; Leb, Ines; Prokosch, Hans-Ulrich; Ückert, Frank

    2016-03-01

    Medical research projects often require more biological material than can be supplied by a single biobank. For this reason, a multitude of strategies support locating potential research partners with matching material without requiring centralization of sample storage. Classification of different strategies for biobank networks, in particular for locating suitable samples. Description of an IT infrastructure combining these strategies. Existing strategies can be classified according to three criteria: (a) granularity of sample data: coarse bank-level data (catalogue) vs. fine-granular sample-level data, (b) location of sample data: central (central search service) vs. decentral storage (federated search services), and (c) level of automation: automatic (query-based, federated search service) vs. semi-automatic (inquiry-based, decentral search). All mentioned search services require data integration. Metadata help to overcome semantic heterogeneity. The "Common Service IT" in BBMRI-ERIC (Biobanking and BioMolecular Resources Research Infrastructure) unites a catalogue, the decentral search and metadata in an integrated platform. As a result, researchers receive versatile tools to search suitable biomaterial, while biobanks retain a high degree of data sovereignty. Despite their differences, the presented strategies for biobank networks do not rule each other out but can complement and even benefit from each other.

  5. Debating Modernity as Secular Religion: Hans Kelsen’s futile exchange with Eric Voegelin

    DEFF Research Database (Denmark)

    Thomassen, Bjørn

    2014-01-01

    This article reviews the mysterious and recently published last book by Hans Kelsen, “Secular Religion. A Polemic Against the Misinterpretation of Modern Social Philosophy, Science and Politics as ‘New Religions’”, contextualizing it with reference to the little known dialogue between Hans Kelsen...... and Eric Voegelin. The confrontation between Kelsen and Voegelin, two of the most illustrious émigré scholars who found in America their new home, is important to revisit because it touches upon several axes of debate of crucial importance to postwar intellectual history: the religion/secularity debate......, the positivist/anti-positivist debates, and the controversy that also led to the famous Voegelin/Arendt debate: how to read the horrors of totalitarianism into a historical trajectory of modernity. Although the Kelsen/Voegelin exchange ended in failure and bitterness its substance matter goes to the heart...

  6. Eric Hermelin and mystical hermeneutics: interpretation beyond itself

    Directory of Open Access Journals (Sweden)

    Tina Hamrin

    1999-01-01

    Full Text Available Eric Hermelin (1860-1944 translated more than 10.000 pages Persian Sufi poetry, German texts by Jakob Böhme and Latin texts by Emmanuel Swedenborg. In the translation process Hermelin shaped his strategies and perceptions in ways which served their patterns of desire, and what they constructed reflected and served their own unique identity. Added up, the devices which constitute strategies of reading set in motion by the selfs defense of its identity are: Defenses, Expectations, Fantasies, and Transformations. Hermelin's mystical hermeneutics produced not only understanding of texts, but often no less produced an increased awareness, with appropriate hermeneutical sensitivity, of self-perception and self-identity. A self-awareness and a strengthening of an individual and corporate identity as one who has a stake in the texts and that to which they bear witness constitutes an important reader-effect in this case of Sufi poetry. But without any principle of suspicion, in Gadamer's terminology a premature fusion of horizons will take place before Hermelin has listened in openness with respect for the tension between the horizons of the text and the horizon of Hermelin. The textual horizon has col-lapsed into that of Hermelin's narrative biography, and is unable to do more than to speak back his own valnes and desires. Something socio-pragmatical was after all woven into the controversial bon vivant, when he used literary works to replicate himself. At the same time, the texts spoke from beyond the self.

  7. Reflections on Sven-Eric Liedman’s Marx-Biography “A World to Win: The Life and Works of Karl Marx”

    OpenAIRE

    Christian Fuchs

    2018-01-01

    The English translation of Sven-Eric Liedman’s Marx-biography A World to Win: The Life and Works of Karl Marx was published two weeks before Marx’s bicentenary. This article presents reflections on Liedman’s book and asks how one should best write biographically about Marx. The paper compares Liedman’s biography to the Marx-biographies written by Jonathan Sperber (Karl Marx: A Nineteenth-Century Life) and Gareth Stedman-Jones (Karl Marx: Greatness and Illusion). A biography is a way of repeat...

  8. Embracing complexity: the post-secular pilgrimage of Eric-Emmanuel Schmitt

    Directory of Open Access Journals (Sweden)

    Ruth Illman

    2010-01-01

    Full Text Available This article deals with the phenomenon of pilgrimage as a personal transformative process; an exploration of spiritual space rather than a journey undertaken to a physical place. The analysis focuses on the life story and authorship of the novelist and playwright Eric-Emmanuel Schmitt (b. 1960. Schmitt began his career as an academic philosopher specialised in enlightenment rationality. A mystical experience in the deserts of Sahara, however, opened his eyes to the spiritual dimensions of reality and encouraged him to redirect his professional strivings from academic writing to fiction. Today, Schmitt has reached a world-wide audience with his plays and novels on interreligious dialogue, especially the series of five short novellas called Le cycle d’Invisible. These narratives all deal with inter-religious encounters in a complex and compassionate way as Schmitt is particularly concerned with preserving the mystery of the situations he describes. The atheist conviction of his previous life has thus given way to an agnostic and mystically inspired world view focusing on diversity, divinity and inexplicability: “I am obsessed with complexity”, as he puts it himself. The presentation is based on ethnographic material, and key themes to be addressed include pilgrimage as a spiritual journey, interreligious encounters and mystical experiences.

  9. La investigación en Educación Musical en la base de datos ERIC

    Directory of Open Access Journals (Sweden)

    Galera, María

    2008-12-01

    Full Text Available This article describes a bibliometrical analysis of articles on research in Music Education published from 1995 to 2007 and included in ERIC database. These articles represent 54% of all music education articles included in this database. The results show a list with 10 journals which has more than 20 of these articles. The sum of the articles contained in the first four journals is equivalent to 60% of music education articles published from 1995 to 2007. None of these journals are at JCR Social Sciences. Almost all authors of the revised articles usually work alone and occasionally. It seems that there are not research groups or strong consolidated research directions. The most common subjects are: students (attitudes, motivation and effectiveness; teachers; musical composition (activities and music techniques.

  10. Fans of Columbine shooters Eric Harris and Dylan Klebold

    Directory of Open Access Journals (Sweden)

    Andrew Ryan Rico

    2015-09-01

    Full Text Available On April 20, 1999, Eric Harris and Dylan Klebold murdered 12 students and one teacher at Columbine High School in Littleton, Colorado, in what was then the deadliest school shooting in American history. Despite causing a national panic and serving as a flash point for larger narratives on bullying, gun control, and media violence, both boys have gained active online fans. These fandoms dedicated to the Columbine shooters are widely referred to as dark examples of Internet communities, while the fans are also frequently denigrated as unstable and violent outcasts. Such dark online fandoms are yet to permeate mainstream culture or to challenge the preexisting perception of these communities as breeding grounds for the next wave of school shooters. While studies have covered the types of fans and their myriad interests, the field remains focused on more conventional examples of fan communities. In an effort to challenge and expand the object of focus when we study fandom, this qualitative study examines Columbine fans and their activity in order to understand the dominant motives they appear to have for engaging with and around such controversial figures and then concludes by exploring how this community might help us reflect more broadly on our concept of fandom. Redeeming these fans as part of diverse and complex communities of social relevance can demonstrate how even a dark fandom such as that of these Columbine shooters provides valuable cultural insights and benefits the field of fan studies.

  11. Music and Consciousness: A Continuing Project

    Science.gov (United States)

    Clarke, David; Clarke, Eric

    2014-01-01

    If there is a topic on which the humanities might make a distinctive claim, it is that of consciousness--an essential aspect of human being. And within the humanities, music might make its own claims in relation to both consciousness and being human. To investigate this connection, David Clarke and Eric Clarke brought together a wide variety of…

  12. Technical Evaluation of Sample-Processing, Collection, and Preservation Methods

    Science.gov (United States)

    2014-07-01

    Belcamp, MD 21017-1543 Bryan Rivers Eric Schaffer LEIDOS, INC. Gunpowder, MD 21010-0068 Evan Skrowronski TMG BIOSCIENCES, LLC Incline Village...Bryan; Schaffer, Eric (Leidos); and Skrowronski, Evan ( TMG Biosciences) 5d. PROJECT NUMBER R.0000061.61.41.1 5e. TASK NUMBER 5f. WORK UNIT...Leidos, Inc., P.O. Box 68, Gunpowder, MD 21010-0068 TMG Biosciences LLC, 774 Mays Blvd., Incline Village, NV 89451-9613 8. PERFORMING ORGANIZATION

  13. Soil bacterial and fungal community successions under the stress of chlorpyrifos application and molecular characterization of chlorpyrifos-degrading isolates using ERIC-PCR*

    Science.gov (United States)

    Chen, Lie-zhong; Li, Yan-li; Yu, Yun-long

    2014-01-01

    Chlorpyrifos is a widely used insecticide in recent years, and it will produce adverse effects on soil when applied on crops or mixed with soil. In this study, nested polymerase chain reaction (PCR) and denaturing gradient gel electrophoresis (DGGE) were combined to explore the bacterial and fungal community successions in soil treated with 5 and 20 mg/kg of chlorpyrifos. Furthermore, isolates capable of efficiently decomposing chlorpyrifos were molecular-typed using enterobacterial repetitive intergenic consensus-PCR (ERIC-PCR). Under the experimental conditions, degradation of chlorpyrifos in soil was interpreted with the first-order kinetics, and the half-lives of chlorpyrifos at 5 and 20 mg/kg doses were calculated to be 8.25 and 8.29 d, respectively. DGGE fingerprint and principal component analysis (PCA) indicated that the composition of the fungal community was obviously changed with the chlorpyrifos treatment, and that samples of chlorpyrifos treatment were significantly separated from those of the control from the beginning to the end. While for the bacterial community, chlorpyrifos-treated soil samples were apparently different in the first 30 d and recovered to a similar level of the control up until 60 d, and the distance in the PCA between the chlorpyrifos-treated samples and the control was getting shorter through time and was finally clustered into one group. Together, our results demonstrated that the application of chlorpyrifos could affect the fungal community structure in a quick and lasting way, while only affecting the bacterial community in a temporary way. Finally, nine typical ERIC types of chlorpyrifos-degrading isolates were screened. PMID:24711353

  14. Fiber Optics Technician. Curriculum Research Project. Final Report.

    Science.gov (United States)

    Whittington, Herschel K.

    A study examined the role of technicians in the fiber optics industry and determined those elements that should be included in a comprehensive curriculum to prepare fiber optics technicians for employment in the Texas labor market. First the current literature, including the ERIC database and equipment manufacturers' journals were reviewed. After…

  15. Detection of Naturally Occurring Gear and Bearing Faults in a Helicopter Drivetrain

    Science.gov (United States)

    2014-01-01

    Detection of Naturally Occurring Gear and Bearing Faults in a Helicopter Drivetrain by Kelsen E. LaBerge, Eric C. Ames, and Brian D. Dykas...5066 ARL-TR-6795 January 2014 Detection of Naturally Occurring Gear and Bearing Faults in a Helicopter Drivetrain Kelsen E. LaBerge...ELEMENT NUMBER 6. AUTHOR(S) Kelsen E. LaBerge, Eric C. Ames, and Brian D. Dykas 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER

  16. The Prerogative of "Corrective Recasts" as a Sign of Hegemony in the Use of Language: Further Thoughts on Eric Hauser's (2005) "Coding 'Corrective Recasts': The Maintenance of Meaning and More Fundamental Problems"

    Science.gov (United States)

    Rajagopalan, Kanavillil

    2006-01-01

    The objective of this response article is to think through some of what I see as the far-reaching implications of a recent paper by Eric Hauser (2005) entitled "Coding 'corrective recasts': the maintenance of meaning and more fundamental problems". Hauser makes a compelling, empirically-backed case for his contention that, contrary to widespread…

  17. The Physics of Beams: The Andrew Sessler Symposium

    International Nuclear Information System (INIS)

    Barletta, W.A.

    1996-01-01

    These proceedings represent papers presented at the Andrew Sessler Symposium held at the Lawrence Berkeley National Laboratory in honor of Andrew Sessler close-quote s over forty years of major scientific contributions to accelerator and beam physics as well as in celebration of his 65th birthday. The symposium was sponsored by the United States Department of Energy. The topics discussed include linear colliders, past history and future speculations, ELOISATRON at 100 TeV beam, manipulating charged particle beams by means of plasma and collective instabilities in accelerator and storage rings. There were 10 papers presented and 8 have been abstracted for the Energy Science and Technology database

  18. The Very Large Hadron Collider: The farthest energy frontier

    International Nuclear Information System (INIS)

    Barletta, William A.

    2001-01-01

    The Very Large Hadron Collider (or Eloisatron) represents what may well be the final step on the energy frontier of accelerator-based high energy physics. While an extremely high luminosity proton collider at 100-200 TeV center of mass energy can probably be built in one step with LHC technology, that machine would cost more than what is presently politically acceptable. This talk summarizes the strategies of collider design including staged deployment, comparison with electron-positron colliders, opportunities for major innovation, and the technical challenges of reducing costs to manageable proportions. It also presents the priorities for relevant R and D for the next few years

  19. Developing the Navy’s NC Flying Boats: Transforming Aeronautical Engineering for the First Transatlantic Flight

    Science.gov (United States)

    2011-12-01

    Silberg , David J. Haas w ^m^e^ä^ Approved for Public Release; distribution is unlimited. f REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188...PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Eric Silberg , David Haas 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 99-2-5300-010-12 17...THIS PAGE UNCLASSIFIED 17. LIMITATION OF ABSTRACT UL 18. NUMBER OF PAGES 2 7 19a. NAME OF RESPONSIBLE PERSON Eric Silberg 19b. TELEPHONE

  20. Analysis of the scientific production on feedback on teaching English as a foreign language using ERIC database

    Directory of Open Access Journals (Sweden)

    Carmem Silvia Lima Fluminhan

    2017-11-01

    Full Text Available Feedback is one of the most significant tools on learning, teaching, developing autonomy, self-efficacy and achievement in the educational environment. Its importance is emphasized in articles, dissertations and theses; however, a very little number of them have been published recently. This article intends to verify in what perspective feedback has been examined, in what ways it has been revealed to be effective for students and teachers to reach their goals and identify possible gaps of study that need to be fulfilled in future researches. In order to carry out this investigation, this study examined articles, papers and theses published from 2006 to 2015 about feedback in courses of English as a foreign language (EFL, using ERIC database. Our findings were organized into six categories: corrective feedback in oral interaction; effects of peer feedback; feedback expectancy; teachers’ conceptions of intelligence and their relations in offering feedback; the effect of different types of feedback strategies on written texts; the use of feedback through technology. The results indicate that feedback is a crucial tool in the educational process and it plays a central role in learning a foreign language. Further investigations concerning feedback are suggested.

  1. Pictorial Real, Historical Intermedial. Digital Aesthetics and the Representation of History in Eric Rohmer’s The Lady and the Duke

    Directory of Open Access Journals (Sweden)

    Tagliani Giacomo

    2016-09-01

    Full Text Available In The Lady and the Duke (2001, Eric Rohmer provides an unusual and “conservative” account of the French Revolution by recurring to classical and yet “revolutionary” means. The interpolation between painting and film produces a visual surface which pursues a paradoxical effect of immediacy and verisimilitude. At the same time though, it underscores the represented nature of the images in a complex dynamic of “reality effect” and critical meta-discourse. The aim of this paper is the analysis of the main discursive strategies deployed by the film to disclose an intermedial effectiveness in the light of its original digital aesthetics. Furthermore, it focuses on the problematic relationship between image and reality, deliberately addressed by Rohmer through the dichotomy simulation/illusion. Finally, drawing on the works of Louis Marin, it deals with the representation of history and the related ideology, in order to point out the film’s paradoxical nature, caught in an undecidability between past and present.

  2. In Situ Immobilization of Uranium in Structured Porous Media via Biomineralization at the Fracture/Matrix Interface – Subproject to Co-PI Eric E. Roden

    Energy Technology Data Exchange (ETDEWEB)

    Eric E. Roden

    2007-11-02

    Although the biogeochemical processes underlying in situ bioremediation technologies are increasingly well understood, field-scale heterogeneity (both physical and biogeochemical) remains a major obstacle to successful field-scale implementation. In particular, slow release of contamination from low-permeability regions (primarily by diffusive/dispersive mass transfer) can hinder the effectiveness of remediation. The research described in this report was conducted in conjunction with a project entitled “In Situ Immobilization of Uranium in Structured Porous Media via Biomineralization at the Fracture/Matrix Interface”, which was funded through the Field Research element of the former NABIR Program (now the Environmental Remediation Sciences Program) within the Office of Biological and Environmental Research. Dr. Timothy Scheibe (Pacific Northwest National Laboratory) was the overall PI/PD for the project, which included Scott Brooks (Oak Ridge National Laboratory) and Eric Roden (formerly at The University of Alabama, now at the University of Wisconsin) as separately-funded co-PIs. The overall goal of the project was to evaluate strategies that target bioremediation at interfaces between high- and low-permeability regions of an aquifer in order to minimize the rate of contaminant transfer into high-permeability/high fluid flow zones. The research was conducted at the Area 2 site of the Field Research Center (FRC) at Oak Ridge National Laboratory (ORNL). Area 2 is a shallow pathway for migration of contaminated groundwater to seeps in the upper reach of Bear Creek at ORNL, mainly through a ca. 1 m thick layer of gravel located 4-5 m below the ground surface. Hydrological tracer studies indicate that the gravel layer receives input of uranium from both upstream sources and from diffusive mass transfer out of highly contaminated fill and saprolite materials above and below the gravel layer. We sought to test the hypothesis that injection of electron donor into

  3. In Situ Immobilization of Uranium in Structured Porous Media via Biomineralization at the Fracture/Matrix Interface - Subproject to Co-PI Eric E. Roden. Final report

    International Nuclear Information System (INIS)

    Roden, Eric E.

    2007-01-01

    Although the biogeochemical processes underlying in situ bioremediation technologies are increasingly well understood, field-scale heterogeneity (both physical and biogeochemical) remains a major obstacle to successful field-scale implementation. In particular, slow release of contamination from low-permeability regions (primarily by diffusive/dispersive mass transfer) can hinder the effectiveness of remediation. The research described in this report was conducted in conjunction with a project entitled ''In Situ Immobilization of Uranium in Structured Porous Media via Biomineralization at the Fracture/Matrix Interface'', which was funded through the Field Research element of the former NABIR Program (now the Environmental Remediation Sciences Program) within the Office of Biological and Environmental Research. Dr. Timothy Scheibe (Pacific Northwest National Laboratory) was the overall PI/PD for the project, which included Scott Brooks (Oak Ridge National Laboratory) and Eric Roden (formerly at The University of Alabama, now at the University of Wisconsin) as separately-funded co-PIs. The overall goal of the project was to evaluate strategies that target bioremediation at interfaces between high- and low-permeability regions of an aquifer in order to minimize the rate of contaminant transfer into high-permeability/high fluid flow zones. The research was conducted at the Area 2 site of the Field Research Center (FRC) at Oak Ridge National Laboratory (ORNL). Area 2 is a shallow pathway for migration of contaminated groundwater to seeps in the upper reach of Bear Creek at ORNL, mainly through a ca. 1 m thick layer of gravel located 4-5 m below the ground surface. Hydrological tracer studies indicate that the gravel layer receives input of uranium from both upstream sources and from diffusive mass transfer out of highly contaminated fill and saprolite materials above and below the gravel layer. We sought to test the hypothesis that injection of electron donor into this

  4. Filosofía y violencia. Del absoluto a la acción en la Lógica de la filosofía de Eric Weil

    Directory of Open Access Journals (Sweden)

    Roberto Saldías Barrer

    2013-01-01

    Full Text Available Las tensiones y los vínculos posibles entre razón y violencia son un problema mayor para la filosofía. La obra de Eric Weil se consagra precisamente al análisis de las figuras históricas de dicha tensión, y su obra mayor, Logique de la Philosophie, desarrolla lo fundamental de dicho propósito. Se analiza la manera como Weil, desde la categoría de la acción –última categoría concreta de la filosofía–, en vínculo con las categorías precedentes (absoluto, obra, finito y con las categorías formales (sentido y sabiduría, enfrenta este desafío siempre nuevo para la filosofía.

  5. Computer-Assisted Language Learning: Current Programs and Projects. ERIC Digest.

    Science.gov (United States)

    Higgins, Chris

    For many years, foreign language teachers have used the computer to provide supplemental exercises in the instruction of foreign languages. In recent years, advances in computer technology have motivated teachers to reassess the computer and consider it a valuable part of daily foreign language learning. Innovative software programs, authoring…

  6. EOS Aqua: Mission Status at the Earth Science Constellation (ESC) Mission Operations Working Group (MOWG) Meeting at the Kennedy Space Center (KSC)

    Science.gov (United States)

    Guit, Bill

    2017-01-01

    This presentation at the Earth Science Constellation Mission Operations Working Group meeting at KSC in December 2017 to discuss EOS (Earth Observing System) Aqua Earth Science Constellation status. Reviewed and approved by Eric Moyer, ESMO (Earth Science Mission Operations) Deputy Project Manager.

  7. 76 FR 61150 - Enhanced-Use Lease (EUL) of Department of Veterans Affairs (VA) Real Property for the Development...

    Science.gov (United States)

    2011-10-03

    ...) Real Property for the Development of a Senior Living Retirement and Affordable Housing Community in... will finance, design, renovate, construct, manage, maintain and operate the EUL development. As... property is located. This project meets this requirement. Approved: September 26, 2011. Eric K. Shinseki...

  8. Mission Status for Earth Science Constellation MOWG Meeting at KSC: EOS Aura

    Science.gov (United States)

    Fisher, Dominic

    2017-01-01

    This will be presented at the Earth Science Constellation Mission Operations Working Group (MOWG) meeting at KSC (Kennedy Space Center) in December 2017 to discus EOS (Earth Observing System) Aura status. Reviewed and approved by Eric Moyer, ESMO (Earth Sciences Mission Operations) Deputy Project Manager.

  9. Proceedings of the 23rd Annual Penn Linguistics Colloquium. University of Pennsylvania Working Papers in Linguistics, Volume 6, Number 1.

    Science.gov (United States)

    Alexander, Jim, Ed.; Han, Na-Rae, Ed.; Fox, Michelle Minnick, Ed.

    This issue includes the following articles: "Assimilation to the Unmarked" (Eric Bakovic); "On the Non-Universality of Functional Projections and the Effects on Parametrized Variation: Evidence from Creoles" (Marlyse Baptista); "What Turkish Acquisition Tells Us about Underlying Word Order and Scrambling" (Natalie Batman-Ratyosyan, Karin…

  10. 76 FR 72047 - Enhanced-Use Lease (EUL) of Department of Veterans Affairs (VA) Real Property for the Development...

    Science.gov (United States)

    2011-11-21

    ...) Real Property for the Development of Permanent Housing in Walla Walla, WA AGENCY: Department of... housing development. The lessee will also be required to provide preference and priority placement for... property is located. This project meets this requirement. Approved: November 14, 2011. Eric K. Shinseki...

  11. 76 FR 72046 - Enhanced-Use Lease (EUL) of Department of Veterans Affairs (VA) Real Property for the Development...

    Science.gov (United States)

    2011-11-21

    ... DEPARTMENT OF VETERANS AFFAIRS Enhanced-Use Lease (EUL) of Department of Veterans Affairs (VA) Real Property for the Development of Space for Community Services and Parking in Memphis, TN AGENCY... property is located. This project meets this requirement. Approved: November 14, 2011. Eric K. Shinseki...

  12. 76 FR 71442 - Enhanced-Use Lease (EUL) of Department of Veterans Affairs (VA) Real Property for the Development...

    Science.gov (United States)

    2011-11-17

    ...) Real Property for the Development of a Transitional and Permanent Housing Facility in Bath, NY AGENCY..., design, develop, construct, renovate, manage, operate and maintain the EUL development. As consideration... property is located. This project meets this requirement. Approved: November 10, 2011. Eric K. Shinseki...

  13. 76 FR 67021 - Enhanced-Use Lease (EUL) of Department of Veterans Affairs (VA) Real Property for the Development...

    Science.gov (United States)

    2011-10-28

    ...) Real Property for the Development of an Assisted Living Facility in Newington, CT AGENCY: Department of..., design, develop, construct, manage, maintain and operate the EUL development. As consideration for the... the property is located. This project meets this requirement. Approved: October 21, 2011. Eric K...

  14. 76 FR 72048 - Enhanced-Use Lease (EUL) of Department of Veterans Affairs (VA) Real Property for the Development...

    Science.gov (United States)

    2011-11-21

    ... DEPARTMENT OF VETERANS AFFAIRS Enhanced-Use Lease (EUL) of Department of Veterans Affairs (VA) Real Property for the Development of Permanent Housing in Grand Island, NE AGENCY: Department of... property is located. This project meets this requirement. Approved: November 14, 2011. Eric K. Shinseki...

  15. 76 FR 72045 - Enhanced-Use Lease (EUL) of Department of Veterans Affairs (VA) Real Property for the Development...

    Science.gov (United States)

    2011-11-21

    ...) Real Property for the Development of Permanent Housing in Augusta, GA AGENCY: Department of Veterans... lessee will be required to finance, design, develop, construct, maintain and operate the EUL development... property is located. This project meets this requirement. Approved: November 14, 2011. Eric K. Shinseki...

  16. Small Classes 1, Vouchers 0.

    Science.gov (United States)

    Bracey, Gerald W.

    2000-01-01

    Alan Krueger's reanalyses of Eric Hanushek's school-productivity data show that Hanushek's "money doesn't matter" conclusions (influential in several states' education-finance hearings) have no factual basis. Hanushek excluded Tennessee's student/teacher ratio study (Project STAR). Also, class size is influencing students' success in…

  17. Interaction of Typhoon and Ocean Project ITOP Data Management and Operations Support

    Science.gov (United States)

    2013-09-30

    EOL ) by Scot Loehrer and Steve Williams with input from Jim Moore (also EOL ) and Eric D’Asaro (University of Washington). The web page is the...central location for all ITOP-related information. It contains links to the data archives at EOL and the Monterey Bay Aquarium Research Institute (MBARI...the field catalogs from ITOP “dry run” 2009 and 2010 field deployments, meetings, publications, and documents. For all of the ITOP meetings, EOL

  18. Interaction of Typhoon and Ocean Project (ITOP) Data Management and Operations Support

    Science.gov (United States)

    2012-09-30

    EOL ) by Scot Loehrer and Steve Williams with input from Jim Moore (also EOL ) and Eric D’Asaro (University of Washington). The web page is the central...location for all ITOP-related information. It contains links to the data archives at EOL and the Monterey Bay Aquarium Research Institute (MBARI...the field catalogs from ITOP “dry run” 2009 and 2010 field deployments, meetings, publications, and documents. For all of the ITOP meetings, EOL

  19. Reflexiones y Experiencias desde las entrañas del Islamismo Militante. Análisis de la biografía de Eric Breininguer

    Directory of Open Access Journals (Sweden)

    Miguel Ángel Cano Paños

    2011-05-01

    Full Text Available El objetivo del siguiente trabajo es analizar el proceso de radicalización yihadista de un joven converso nacido y crecido en Occidente. Se trata del caso de Eric Breininger, un individuo alemán que en abril de 2010 encontró la muerte en la región de Waziristán en el transcurso de un combate contra soldados pakistaníes. La base del siguiente trabajo está constituida por las memorias del joven alemán, las cuales fueron publicadas en Internet días después del anuncio de su muerte. Dichas memorias suponen sin duda un documento de trascendental importancia que permiten acercarse al proceso de radicalización de un individuo de origen occidental. Asimismo, ofrecen una visión muy cercana de la vida cotidiana de aquellos individuos radicalizados que en la primera línea del frente libran su particular batalla –en algunos casos sacrificando incluso su propia vida– en defensa de su particular visión del Islam.

  20. Clinical History of the Theranostic Radionuclide Approach to Neuroendocrine Tumors and Other Types of Cancer: Historical Review Based on an Interview of Eric P. Krenning by Rachel Levine.

    Science.gov (United States)

    Levine, Rachel; Krenning, Eric P

    2017-09-01

    In nuclear medicine, the term theranostics describes the combination of therapy and diagnostic imaging. In practice, this concept dates back more than 50 years; however, among the most successful examples of theranostics are peptide receptor scintigraphy and peptide receptor radionuclide therapy of neuroendocrine tumors. The development of these modalities through the radiolabeling of somatostatin analogs with various radionuclides has led to a revolution in patient management and established a foundation for expansion of the theranostic principle into other oncology indications. This article provides a review of the evolution and development of the theranostic radionuclide approach to the management of neuroendocrine tumors, as described by the inventor of this technique, Eric P. Krenning, in an interview with Rachel Levine. © 2017 by the Society of Nuclear Medicine and Molecular Imaging.

  1. Foreword: The 12th International Conference on Vibrations at Surfaces (VAS 12) (Erice, 20 26 July 2007)

    Science.gov (United States)

    Benedek, Giorgio; Vattuone, Luca

    2008-06-01

    The 12th International Conference on Vibrations at Surfaces (VAS 12) took place from 20 26 July 2007 as an event of the International School of Solid State Physics at the Ettore Majorana Foundation and Centre for Scientific Culture, Erice (Italy). The format and special environment of the conference have contributed to its transition from a traditional, medium-size conference into a more effective workshop, with a series of lectures reporting the most recent developments in the field, two poster sessions presenting recent results and even works in progress being discussed. The papers collected in this issue cover the highlights of the conference very thoroughly. Quite a few novel aspects concerning vibrations at surfaces are represented here, for example: new aspects in surface phonon spectroscopy, such as the very recent progress in inelastic x-ray scattering, the first observation of the boson peak in disordered surfaces, progress in the theory of atom scattering inelastic resonances, the action spectroscopy, the study of polycrystalline surfaces with electron energy-loss spectroscopy etc; parallel developments in experimental vibrational studies of adsorbed phases, either inorganic or organic, with those in ab initio theoretical simulations; the theory of enhanced electron--phonon interaction in low dimensions (2D and 1D); the extension from the traditional realm of surface vibrations and spectroscopy to other aspects of surface dynamics, like friction and various nonlinear effects, and to relevant dynamical phenomena occurring at interfaces. Other novelties presented at the conference, but already published in recent issues of the Journal of Physics: Condensed Matter, are also worth mentioning: the spin-echo spectroscopy with 3He allowing for slow-dynamics spectroscopy at very high, unprecedented resolutions (2007 J. Phys.: Cond. Matter 19 300301 and 305010; the first demonstration of dissociative surface trapping of molecules (2007 J. Phys.: Cond. Matter 19

  2. Delft3D-Modelling of Hydrodynamic and Water Quality Processes in San Diego Bight

    Science.gov (United States)

    2010-09-30

    Terrill (SIO Scripps), Dr. Lyle Hibler ( PNL ) and Mark Moline (CalPoly) who are funded separately. LONG-TERM GOALS The long-term goal of this effort is...October 3, 2002. RELATED PROJECTS This work is a cooperation with Dr. Eric Terrill (SIO Scripps), Dr. Lyle Hibler ( PNL ) and Mark Moline (CalPoly) who are funded separately. 5

  3. New home construction: Eric Allen

    Energy Technology Data Exchange (ETDEWEB)

    1987-02-01

    This report describes some special energy efficient measures incorporated in the construction of a modestly-priced two and a half storey frame house with a floor area of 108 m{sup 2}. The house was built facing south, on a south-sloping lot with a thick stand of Jack Pine on the north side. The major energy efficient measures are: continuous air-vapour barrier and high insulation level to make the house as air-tight as possible; the use of passive solar heat which is expected to supply 37% of the annual heating requirements; a crawlspace plenum which draws hot air from the top of the house and recirculates it under the first floor; and use of horizontal strapping on which all wall partitions, electrical and plumbing work was done in order not to break the continuous air-vapour barrier and which itself provides extra insulation. The cost of making the house energy efficient was $2,500. The price of the house on completion was projected to be $65,000. The cost for the energy efficiency measures is 4% of the total. The Allen house is a good example of how an investment of a small percentage of the total cost, and about 67 hours of work, can result in an energy efficient house. The resulting savings on energy bills can be quite significant and can mean a return on the investment within 5 years. 3 figs., 1 tab.

  4. Standards for the High School Psychology Course. ERIC Digest.

    Science.gov (United States)

    Morganett, L. Lee

    The latest contribution to the content standards boom that began in the 1990s comes from the American Psychological Association (APA), which recently published "National Standards for the Teaching of High School Psychology." This Digest discusses: (1) the origin and purposes of the project to develop standards for high school psychology…

  5. Aqua/Aura Updated Inclination Adjust Maneuver Performance Prediction Model

    Science.gov (United States)

    Boone, Spencer

    2017-01-01

    This presentation will discuss the updated Inclination Adjust Maneuver (IAM) performance prediction model that was developed for Aqua and Aura following the 2017 IAM series. This updated model uses statistical regression methods to identify potential long-term trends in maneuver parameters, yielding improved predictions when re-planning past maneuvers. The presentation has been reviewed and approved by Eric Moyer, ESMO Deputy Project Manager.

  6. Developing Conceptual Models for Assessing Climate Change Impacts to Contaminant Availability in Terrestrial Ecosystems

    Science.gov (United States)

    2015-03-01

    Greenberg 2005), effects of dredged material (PIANC 2006), and ecosystem restoration (Fischenich 2008) among others. The process of developing a conceptual...Impacts to Contaminant Availability in Terrestrial Ecosystems by Burton C. Suedel, Nathan R. Beane, Eric R. Britzke, Cheryl R. Montgomery, and...are generally project or problem specific. Building a CM includes determining the components of the ecosystem , identifying relationships linking these

  7. Improving evidence based practice in postgraduate nursing programs: A systematic review: Bridging the evidence practice gap (BRIDGE project).

    Science.gov (United States)

    Hickman, Louise D; DiGiacomo, Michelle; Phillips, Jane; Rao, Angela; Newton, Phillip J; Jackson, Debra; Ferguson, Caleb

    2018-04-01

    The nursing profession has a significant evidence to practice gap in an increasingly complex and dynamic health care environment. To evaluate effectiveness of teaching and learning strategies related to a capstone project within a Masters of Nursing program that encourage the development of evidence based practice capabilities. Systematic review that conforms to the PRISMA statement. Master's Nursing programs that include elements of a capstone project within a university setting. MEDLINE, CINAHL, Cochrane Database of Systematic Reviews, ERIC and PsycInfo were used to search for RCT's or quasi experimental studies conducted between 1979 and 9 June 2017, published in a peer reviewed journal in English. Of 1592 studies, no RCT's specifically addressed the development of evidence based practice capabilities within the university teaching environment. Five quasi-experimental studies integrated blended learning, guided design processes, small group work, role play and structured debate into Masters of Nursing research courses. All five studies demonstrated some improvements in evidence based practice skills and/or research knowledge translation, with three out of five studies demonstrating significant improvements. There is a paucity of empirical evidence supporting the best strategies to use in developing evidence based practice skills and/or research knowledge translation skills for Master's Nursing students. As a profession, nursing requires methodologically robust studies that are discipline specific to identify the best approaches for developing evidence-based practice skills and/or research knowledge translation skills within the university teaching environment. Provision of these strategies will enable the nursing profession to integrate the best empirical evidence into nursing practice. Copyright © 2018. Published by Elsevier Ltd.

  8. Electroweak symmetry breaking studies at the pp colliders of the 1990's and beyond

    International Nuclear Information System (INIS)

    Chanowitz, M.S.

    1989-01-01

    Within the conventional framework of a spontaneously broken gauge theory, general principles establish that the electroweak symmetry is broken by a new force that may be weak with associated new quanta below 1 TeV or strong with quanta above 1 TeV. The SSC parameters, √s = 40 TeV and L = 10 33 cm/sup /minus/2/s/sup /minus/1/, define a minimal facility with assured capability to observe the signals of symmetry breaking by a strong force above 1 TeV. Foreseeable luminosity upgrades would not be able to compensate a much lower collider energy for these physics signals. If the strong WW scattering signal were seen at the SSC in the 1990's it would provide a clear imperative for a collider with the physics reach of the ELOISATRON to begin detailed studies of the new force and quanta early in the next century. 35 refs., 7 figs., 4 tabs

  9. Toward seamless high-resolution flash flood forecasting over Europe based on radar nowcasting and NWP: An evaluation with case studies

    Science.gov (United States)

    Park, Shinju; Berenguer, Marc; Sempere-Torres, Daniel; Baugh, Calum; Smith, Paul

    2017-04-01

    Flash floods induced by heavy rain are one of the hazardous natural events that significantly affect human lives. Because flash floods are characterized by their rapid onset, forecasting flash flood to lead an effective response requires accurate rainfall predictions with high spatial and temporal resolution and adequate representation of the hydrologic and hydraulic processes within a catchment that determine rainfall-runoff accumulations. We present extreme flash flood cases which occurred throughout Europe in 2015-2016 that were identified and forecasted by two real-time approaches: 1) the European Rainfall-Induced Hazard Assessment System (ERICHA) and 2) the European Runoff Index based on Climatology (ERIC). ERICHA is based on the nowcasts of accumulated precipitation generated from the pan-European radar composites produced by the EUMETNET project OPERA. It has the advantage of high-resolution precipitation inputs and rapidly updated forecasts (every 15 minutes), but limited forecast lead time (up to 8 hours). ERIC, on the other hand, provides 5-day forecasts based on the COSMO-LEPS NWP simulations updated 2 times a day but is only produced at a 7 km resolution. We compare the products from both systems and focus on showing the advantages, limitations and complementarities of ERICHA and ERIC for seamless high-resolution flash flood forecasting.

  10. How it Works: Some Recent Developments in the Pursuit of Academic Excellence

    Science.gov (United States)

    1990-09-01

    parents as teachers project. Evaluation report and executive evaluation summary. ERIC Document, ED 264 954. Schaefer, Earl S. (1985). Maternal infancy...making, stress the importance of status distinctions, and lack a clear desire to offer emotional and authoritative support to teachers and staff, they... authoritarian structure, or inconsistent funding? However, emphasis should still be placed on the method for assessing the importance of any obstacle

  11. Edgewood Biosensors Test Bed Hand-held and Man-Portable Edition

    Science.gov (United States)

    2013-09-01

    CORPORATION, INC. Gunpowder, MD 21010-0068 Evan Skowronski TMG BIOSCIENCES Incline Village, NV 89451 September 2013 Approved for public release...Emanuel, Peter (ECBC); Rivers, Bryan; Schaffer, Eric (SAIC); and Skowronski, Evan ( TMG Biosciences) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...21010-0068 TMG Biosciences, 774 Mays Blvd. #10-455, Incline Village, NV 89451 8. PERFORMING ORGANIZATION REPORT NUMBER ECBC-TR-1201 9

  12. A National Security Strategy for Sweden: Balancing Risks and Opportunities in the 21st Century

    Science.gov (United States)

    2010-04-01

    physics and chemistry. The Intergovernmental Panel on Climate Change (IPCC) links a higher concentration of greenhouse gases to an increase in atmospheric...Command and Staff College. International Security Studies: AY10 Coursebook . Montgomery, 2009. Air Command and Staff College. War Studies Course: AY10... Coursebook . Montgomery, 2009. Assadourian, Eric (Project Director at the World Watch Institute). Vital Signs 2007-2008; The Trends that are Shaping Our

  13. Understanding the infrastructure of European Research Infrastructures

    DEFF Research Database (Denmark)

    Lindstrøm, Maria Duclos; Kropp, Kristoffer

    2017-01-01

    European Research Infrastructure Consortia (ERIC) are a new form of legal and financial framework for the establishment and operation of research infrastructures in Europe. Despite their scope, ambition, and novelty, the topic has received limited scholarly attention. This article analyses one ER....... It is also a promising theoretical framework for addressing the relationship between the ERIC construct and the large diversity of European Research Infrastructures.......European Research Infrastructure Consortia (ERIC) are a new form of legal and financial framework for the establishment and operation of research infrastructures in Europe. Despite their scope, ambition, and novelty, the topic has received limited scholarly attention. This article analyses one ERIC...... became an ERIC using the Bowker and Star’s sociology of infrastructures. We conclude that focusing on ERICs as a European standard for organising and funding research collaboration gives new insights into the problems of membership, durability, and standardisation faced by research infrastructures...

  14. Between Classicism and Modernity:Eric Rohmer on urban change

    OpenAIRE

    Schmid, Marion

    2015-01-01

    A director at the crossroads of the arts, Éric Rohmer took a keen interest in the urban transformations France underwent in the course of the twentieth century, in particular the post-war villes nouvelles project launched by the Gaullist government in 1965. In a programmatic article on the relationship between cinema and architecture, followed by a series of television documentaries from the 1960s and ’70s as well as two features – Les Nuits de la pleine lune (1984) and L’Ami de mon amie (198...

  15. Ombud's Corner: unexpected turn in the conversation?

    CERN Multimedia

    Sudeshna Datta-Cockerill

    2014-01-01

    Regular informal conversations with colleagues play a very important part in weaving the fabric of team spirit. They allow us to build the working relationships that are vital to the success of our projects and to create an environment of good will that is instrumental in averting potential conflict or crises. However, sometimes they can come with unexpected surprises…   Eric and his colleagues always meet on Monday mornings to have coffee together, before starting the working week. This is a very privileged moment for the team when there are no formal barriers or professional concerns: Mary may talk about a film that she saw at the weekend, Eric often goes hiking in the Jura with his friend Stefan, Hans has always got a story about his son’s prowess on the school football team and occasionally there is a bit of special news such as Louisa’s recent marriage, Pierre’s baby’s christening or Claude’s daughter’s graduation&...

  16. Reaction-Based Transport Modeling of Iron Reduction and Uranium Immobilization at Area 2 of the NABIR Field Research Center

    International Nuclear Information System (INIS)

    Yeh, Gour-Tsyh

    2006-01-01

    This research project (started Fall 2004) was funded by a grant to The Pennsylvania State University, University of Central Florida, and The University of Alabama in the Integrative Studies Element of the NABIR Program (DE-FG04-ER63914/63915/63196). Dr. Eric Roden, formerly at The University of Alabama, is now at the University of Wisconsin - Madison. Our project focuses on the development of a mechanistic understanding and quantitative models of coupled Fe(III)/U(VI) reduction in FRC Area 2 sediments. This work builds on our previous studies of microbial Fe(III) and U(VI) reduction, and is directly aligned with the Scheibe et al. NABIR FRC Field Project at Area 2

  17. Current Research Activities of the Department of Oceanography.

    Science.gov (United States)

    1981-04-01

    support for teaching via blished comprehensive teaching and a large assortment of facilities and research programs, which are con- projects that are... teaching and re- Reichard, and Stephen Riser, joint search laboratories are augmented by appointments with JISAO, and Eric a research fleet consisting of...West. Botanica Marina 23: 333-341. No. 1124 Lewin, J., J.E. Eckman, and G.N. Ware (1979) Blooms of surf-zone diatoms along the coast of the Olympic

  18. Are Resources Important? (Testimony of Eric Alan Hanushek, March 11, 1996).

    Science.gov (United States)

    Hanushek, Eric Alan

    1997-01-01

    E. A. Hanushek analyzed the possibility that the St. Louis (Missouri) school district could operate a quality school system with the resources it would get under the state's transition plan that would phase out state financial support for school desegregation. The witness projected no adverse effect on the quality of education in the city. (SLD)

  19. Ni ética ambiental, ni valores. La reivindicación de Hans Jonas para la ética ambiental hecha por Eric Pommier, considerada desde la crítica de Heidegger al concepto de valor

    Directory of Open Access Journals (Sweden)

    Richard Ayala-Ardila

    2017-01-01

    Full Text Available En este trabajo se cuestiona tanto a la ética ambiental como a la filosofía ambiental desde la crítica hecha por Martin Heidegger al concepto de valor; tal cuestionamiento es precedido por una presentación de las consideraciones de Eric Pommier sobre la ética ambiental, lo cual implica tratar su apreciación de la filosofía ambiental norteamericana (Leopold, Rolston III y Callicot, su lectura de la obra de Hans Jonas y su reivindicación de las ideas de este autor para la ética o para la filosofía ambiental. Se mostrará que los problemas fundamentales de la ética ambiental consisten en encontrar una manera de demostrar el valor intrínseco de la naturaleza y en lograr este objetivo sin hacer concesión alguna al dualismo ontológico.

  20. Final Scientific/Technical Report - DE-FG02-06ER64172 - Reaction-Based Reactive Transport Modeling of Iron Reduction and Uranium Immobilization at Area 2 of the NABIR Field Research Center - Subproject to Co-PI Eric E. Roden

    International Nuclear Information System (INIS)

    Roden, Eric E.

    2009-01-01

    This report summarizes research conducted in conjunction with a project entitled 'Reaction-Based Reactive Transport Modeling of Iron Reduction and Uranium Immobilization at Area 2 of the NABIR Field Research Center', which was funded through the Integrative Studies Element of the former NABIR Program (now the Environmental Remediation Sciences Program) within the Office of Biological and Environmental Research. Dr. William Burgos (The Pennsylvania State University) was the overall PI/PD for the project, which included Brian Dempsey (Penn State), Gour-Tsyh (George) Yeh (Central Florida University), and Eric Roden (formerly at The University of Alabama, now at the University of Wisconsin) as separately-funded co-PIs. The project focused on development of a mechanistic understanding and quantitative models of coupled Fe(III)/U(VI) reduction in FRC Area 2 sediments. The work builds on our previous studies of microbial Fe(III) and U(VI) reduction, and was directly aligned with the Scheibe et al. ORNL FRC Field Project at Area 2. Area 2 is a shallow pathway for migration of contaminated groundwater to seeps in the upper reach of Bear Creek at ORNL, mainly through a ca. 1 m thick layer of gravel located 4-5 m below the ground surface. The gravel layer is sandwiched between an overlying layer of disturbed fill material, and 2-3 m of undisturbed shale saprolite derived from the underlying Nolichucky Shale bedrock. The fill was put in place when contaminated soils were excavated and replaced by native saprolite from an uncontaminated area within Bear Creek Valley; the gravel layer was presumably installed prior to addition of the fill in order to provide a stable surface for the operation of heavy machinery. The undisturbed saprolite is highly weathered bedrock that has unconsolidated character but retains much of the bedding and fracture structure of the parent rock (shale with interbedded limestone). Hydrological tracer studies conducted during the Scheibe et al. field

  1. The Neuroergonomics of Vigilance: Effects of Spatial Uncertainty on Cerebral Blood Flow Velocity and Oculomotor Fatigue

    Science.gov (United States)

    2017-02-01

    at work (pp. 95–112). New York, NY: Oxford University Press. Milosevic, S. (1974). Effects of time and space uncertainty on a vigilance task...Parasuraman, R. (2007). Cerebral hemodynamics and vigilance. In R. Parasuraman & M. Rizzo (Eds.), Neuro- ergonomics : The brain at work (pp. 146–158). New...Eric T. Greenlee 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER H0HJ (53290813) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Naval

  2. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  3. Teaching the skills that enable employees to manage change at Syncrude Canada Ltd. : case study March 2005

    Energy Technology Data Exchange (ETDEWEB)

    Kitagawa, K.

    2005-03-01

    Details of Syncrude's Effective Reading in Context (ERIC) workplace literacy program were presented as part of a series of case studies addressing best practices in the development of essential skills in the workplace. ERIC was designed to enhance supervisors' key essential skills, including reading comprehension, writing and the ability to deal with organizational changes and technological advances. Due to its success, Syncrude now offers ERIC to all of its employees and has made it available to a variety of businesses and institutions across Canada. ERIC was implemented due to a shortage of skilled workers, and concerns that a lack of essential skills in the workforce was affecting productivity. ERIC is delivered in 2 phases: a curriculum adaptation phase and a pilot workshop phase where the skills of all participants are assessed individually. Participants are given samples of printed materials they regularly encounter in their jobs. They are then assessed on how well they can generalize, synthesize and analyze the material. Program evaluations are reviewed to ensure that participants can transfer learned skills into new areas, including work tasks. It costs between $6000 and $12,000 to adapt ERIC for a specific workplace. Details of instructor training methods and course manuals were presented. Over the past 16 years, 6 large industry partners and 9 educational partners have been involved in the delivery of ERIC, which has been adapted to a variety of settings, including an Aboriginal pre-trades program at Keyano College. It was concluded that the implementation of ERIC in organizations has led to increased productivity and a decrease in work-related incidents. The Syncrude Essential Skills training program has now been expanded to include a math and writing component.

  4. Development and validation of a parent-report measure for detection of cognitive delay in infancy.

    Science.gov (United States)

    Schafer, Graham; Genesoni, Lucia; Boden, Greg; Doll, Helen; Jones, Rosamond A K; Gray, Ron; Adams, Eleri; Jefferson, Ros

    2014-12-01

    To develop a brief, parent-completed instrument (ERIC - Early Report by Infant Caregivers) for detection of cognitive delay in 10- to 24-month-olds born preterm, or of low birthweight, or with perinatal complications, and to establish ERIC's diagnostic properties. Scores for ERIC were collected from the parents of 317 children meeting ≥inclusion criterion (birthweight Toddler Development-III cognitive scale. Items were retained according to their individual associations with delay. Sensitivity, specificity, and positive and negative predictive values were estimated and a truncated ERIC was developed for use in children cognitive delay in 10- to 24-month-old preterm infants and as a screen for cognitive delay. © 2014 Mac Keith Press.

  5. Evaluación de dos técnicas de subtipificación molecular para el estudio de Pasteurella multocida Evaluation of two techniques of molecular subtyping to study Pasteurella multocida

    Directory of Open Access Journals (Sweden)

    G. A. Leotta

    2006-12-01

    Full Text Available Se determinó la tipibilidad, la reproducibilidad y el poder discriminatorio de ERIC-PCR y ApaI-PFGE para establecer la relación genética de cepas de Pasteurella multocida. Se estudiaron 49 cepas de diferente origen, subespecie, biotipo, grupo capsular, serotipo somático y perfil de resistencia antimicrobiana. Por ERIC-PCR se establecieron 31 patrones, los que presentaron entre 10 y 14 bandas en un rango comprendido entre 0,2 y 1,2 kb. Por ApaI-PFGE se detectaron 37 patrones de restricción, los cuales presentaron entre 7 y 15 bandas bien definidas de 34 a 450 kb. La tipibilidad de ERIC-PCR fue del 100% (T=1 y la de ApaI-PFGE del 94% (T=0,94. La reproducibilidad de ambas técnicas fue del 100% (R=1; sin embargo, el poder discriminatorio de ERIC-PCR fue 93% (D=0,93 y el de ApaI-PFGE 98% (D=0,98. Mediante ambas técnicas fue posible agrupar las cepas con relación epidemiológica y diferenciar claramente las cepas no relacionadas. Se demostró el valor de ERIC-PCR y ApaI-PFGE para complementar estudios epidemiológicos, principalmente si las cepas en estudio son analizadas por ambas técnicas.Typeability, reproducibility, and discriminatory power of ERIC-PCR and ApaI-PFGE to establish the genetic relation of P. multocida strains were determined. Forty-nine strains of different source, biotype, capsular group, somatic serotype, and resistance to antimicrobials were studied. By ERIC-PCR, 31 patterns were defined with 10 to 14 bands in a rank of 0.2 and 1.2 kb. By ApaI-PFGE, 37 restriction patterns were established with 7 to 15 bands of 34 to 450 kb. Typeability was 100% (T=1 for ERIC-PCR, and 94% (T=0.94 for ApaI-PFGE. Reproducibility of both techniques was 100% (R=1. Discriminatory power was 93% (D=0.93 for ERIC-PCR, and 98% (D=0.98 for ApaI-PFGE. By using both techniques, epidemiologically related strains were grouped, and unrelated strains were clearly differentiated. The value of ERIC-PCR and ApaI-PFGE as complements to epidemiologic studies

  6. Análisis bibliométrico sobre el Aprendizaje Basado en Problemas (ABP en la educación superior a partir de la base de datos ERIC.

    Directory of Open Access Journals (Sweden)

    José Luis Menéndez Varela

    2010-07-01

    Full Text Available El estudio bibliométrico descriptivo que sigue presenta tendencias de investigación sobre el aprendizaje basado en problemas entre 1974 y 2009. Se sirve de la base de datos ERIC y trabaja con una muestra de 1007 documentos. Se analizan los registros a tenor de cuatro variables: el año de publicación o realización, la titulación, el área de conocimiento y la tipología de investigación. En cuanto a la producción científica, pueden diferenciarse tres fases: la primera, de 1974 a 1989, supone el inicio de las publicaciones y muestra escasa relevancia estadística; la segunda, de crecimiento, durante la década de los 90 del pasado siglo; y la última, de maduración, desde el año 2000 hasta el año 2009. La distribución de los registros por sectores de conocimiento destaca Ciencias de la Salud, Ciencias Sociales y Enseñanzas Técnicas. Las titulaciones en las que más ha proliferado el ABP son Medicina, Económicas, Empresariales, Pedagogía, Formación del Profesorado y el conjunto de las ingenierías.

  7. One project`s waste is another project`s resource

    Energy Technology Data Exchange (ETDEWEB)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  8. International Earth Science Constellation Mission Operations Working Group September 27-29, 2016 Aqua Spring 2017 IAM Series

    Science.gov (United States)

    Good, Susan M.

    2016-01-01

    This Aqua Spring 2017 IAM Series powerpoint presentation will be presented at the MOWG meeting in Albuquerque, NM. Topics to be discussed are: recap Aqua 2016 IAM campaign maneuver results and post 2016 IAM MLT evolution; current DMU strategy; 2017 IAM campaign dates and planning; Aqua latest lifetime MLT team predictions. Susan Good is a contractor who supports David Tracewell in code 595 therefore this is being routed through 595. Eric Moyer, ESMO Deputy Project Manager-Technical has reviewed and approved this presentation.

  9. 'Call Eric'

    DEFF Research Database (Denmark)

    Dickson, Thomas

    1999-01-01

    Fremtidens telefoner kan forklædes som øreringe og brillestel, og er styret af brugernes stemme.......Fremtidens telefoner kan forklædes som øreringe og brillestel, og er styret af brugernes stemme....

  10. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  11. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  12. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  13. AcEST: BP914413 [AcEST

    Lifescience Database Archive (English)

    Full Text Available VVEIPF L+SF Sbjct: 108 VVVEIPFYLQLLSF 121 >tr|Q8WIP2|Q8WIP2_9ERIC Maturase K OS=Psammisia ecuadorensis GN=ma...IC Maturase K OS=Macleania insignis GN=matK ... 35 3.9 tr|Q8WIP2|Q8WIP2_9ERIC Maturase K OS=Psammisia ecua...dorensis GN=m... 35 3.9 tr|Q6VQI2|Q6VQI2_9ERIC Maturase K (Fragment) OS=Ceratostema

  14. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  15. Identification and functional analysis of the S-layer protein SplA of Paenibacillus larvae, the causative agent of American Foulbrood of honey bees.

    Directory of Open Access Journals (Sweden)

    Lena Poppinga

    Full Text Available The gram-positive, spore-forming bacterium Paenibacillus larvae is the etiological agent of American Foulbrood (AFB, a globally occurring, deathly epizootic of honey bee brood. AFB outbreaks are predominantly caused by two genotypes of P. larvae, ERIC I and ERIC II, with P. larvae ERIC II being the more virulent genotype on larval level. Recently, comparative proteome analyses have revealed that P. larvae ERIC II but not ERIC I might harbour a functional S-layer protein, named SplA. We here determine the genomic sequence of splA in both genotypes and demonstrate by in vitro self-assembly studies of recombinant and purified SplA protein in combination with electron-microscopy that SplA is a true S-layer protein self-assembling into a square 2D lattice. The existence of a functional S-layer protein is novel for this bacterial species. For elucidating the biological function of P. larvae SplA, a genetic system for disruption of gene expression in this important honey bee pathogen was developed. Subsequent analyses of in vivo biological functions of SplA were based on comparing a wild-type strain of P. larvae ERIC II with the newly constructed splA-knockout mutant of this strain. Differences in cell and colony morphology suggest that SplA is a shape-determining factor. Marked differences between P. larvae ERIC II wild-type and mutant cells with regard to (i adhesion to primary pupal midgut cells and (ii larval mortality as measured in exposure bioassays corroborate the assumption that the S-layer of P. larvae ERIC II is an important virulence factor. Since SplA is the first functionally proven virulence factor for this species, our data extend the knowledge of the molecular differences between these two genotypes of P. larvae and contribute to explaining the observed differences in virulence. These results present an immense advancement in our understanding of P. larvae pathogenesis.

  16. What Is Walking Pneumonia?

    Science.gov (United States)

    ... different from regular pneumonia? Answers from Eric J. Olson, M.D. Walking pneumonia is an informal term ... be treated with an antibiotic. With Eric J. Olson, M.D. Goldman L, et al., eds. Mycoplasma ...

  17. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  18. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  19. Mechanical Thrombectomy with the Embolus Retriever with Interlinked Cages in Acute Ischemic Stroke

    DEFF Research Database (Denmark)

    Steglich-Arnholm, H; Kondziella, D; Wagner, A

    2017-01-01

    BACKGROUND AND PURPOSE: The Embolus Retriever with Interlinked Cages (ERIC) device is a novel stent retriever for mechanical thrombectomy. It consists of interlinked cages and could improve procedural benchmarks and clinical outcome compared with classic stent retrievers. This study compares.......00). However, in patients treated with the ERIC device, thrombectomy procedures were less time-consuming (67 versus 98 minutes,P= .009) and a rescue device was needed less often (18% versus 39%,P= .02) compared with classic stent retrievers. CONCLUSIONS: Mechanical thrombectomy with the ERIC device...... the rates of recanalization, favorable clinical outcome, procedural adverse events, and benchmarks between the ERIC device and classic stent retrievers. MATERIALS AND METHODS: From 545 patients treated with thrombectomy between 2012 and 2015, 316 patients were included. The mean age was 69 ±13 years...

  20. How Should SOF Be Organized?

    Science.gov (United States)

    2011-06-01

    186 Eric Micheletti, French Special Forces: Special Operations Command (Paris: Histoire & Collections, 1999), 16. 187 NSCC, NATO SOF...University, September 2008. Micheletti, Eric. French Special Forces: Special Operations Command. Paris: Histoire & Collections, 1999. Millet, Allan

  1. Suri fetishismi isa

    Index Scriptorium Estoniae

    1999-01-01

    New Yorgis suri kunstnik ja koomiksite joonistaja, pärastsõja-aegse Ameerika bondage-erootika illustraator Eric Stanton. Paar aastat tagasi avaldas Saksa kirjastus Taschen Stantoni elust ja loomingust raamatu, mille toimetas erootikafotograaf Eric Kroll

  2. Hyperinflated Lungs: What Does It Mean?

    Science.gov (United States)

    ... What could cause this? Answers from Eric J. Olson, M.D. Hyperinflated lungs occur when air gets ... chest and pulmonary function tests. With Eric J. Olson, M.D. McCormack MD. Dynamic hyperinflation in patients ...

  3. Climatic Variations in Tropical West African Rainfall and the Implications for Military Planners

    Science.gov (United States)

    2008-06-01

    perturbation pressure isobars. There is a ridge in (a) and a trough in (b) at the equator and to the east of the forcing region. Note that the pressure...Climatology course project team), CDR Eric Buch (C6F Oceanographer), Mr. Samson Brand (NRL Monterey), VADM Paul Gaffney (ret.), Prof. Russell Elsberry, LT...pressure isobars. There is a ridge in (a) and a trough in (b) at the equator and to the east of the forcing region. Note that the pressure to the west

  4. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  5. Can Lung Nodules Be Cancerous?

    Science.gov (United States)

    ... lung nodules be cancerous? Answers from Eric J. Olson, M.D. Yes, lung nodules can be cancerous, ... to determine if it's cancerous. With Eric J. Olson, M.D. AskMayoExpert. Pulmonary nodules. Rochester, Minn.: Mayo ...

  6. The Supply and Demand of Elementary and Secondary School Teachers in the United States. ERIC Digest.

    Science.gov (United States)

    Yasin, Said

    This Digest examines U.S. teacher supply and demand, including projections for the next 10 years. For the past 10 years, the supply of public elementary and secondary school teachers has grown. Currently, the number of teachers in the United States is 3.1 million, 2,666,034 of whom teach in public schools. The number is projected to increase by…

  7. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  8. Identification and characterization of two novel toxins expressed by the lethal honey bee pathogen Paenibacillus larvae, the causative agent of American foulbrood.

    Science.gov (United States)

    Fünfhaus, Anne; Poppinga, Lena; Genersch, Elke

    2013-11-01

    Paenibacillus larvae is a Gram-positive bacterial pathogen causing the epizootic American foulbrood in honey bee larvae. Four so-called enterobacterial repetitive intergenic consensus (ERIC) genotypes of P. larvae exist with P. larvae genotypes ERIC I and ERIC II being responsible for disease outbreaks all over the world. Very few molecular data on the pathogen, on pathogenesis or on virulence factors exist. We now identified two genomic loci in P. larvae ERIC I coding for two binary AB toxins, Plx1 and Plx2. In silico analyses revealed that Plx1 is the third member of an enigmatic family of AB toxins so far only comprising MTX1 of Lysinibacillus sphaericus and pierisin-like toxins expressed by several butterflies. Plx2 is also remarkable because the A-domain is highly similar to C3 exoenzymes, which normally are single domain proteins, while the B-domain is homologous to B-domains of C2-toxins. We constructed P. larvae mutants lacking expression of Plx1, Plx2 or both toxins and demonstrated that these toxins are important virulence factors for P. larvae ERIC I. © 2013 Society for Applied Microbiology and John Wiley & Sons Ltd.

  9. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  10. Learning about the Human Genome. Part 1: Challenge to Science Educators. ERIC Digest.

    Science.gov (United States)

    Haury, David L.

    This digest explains how to inform high school students and their parents about the human genome project (HGP) and how the information from this milestone finding will affect future biological and medical research and challenge science educators. The sections include: (1) "The Emerging Legacy of the HGP"; (2) "Transforming How…

  11. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  12. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  13. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  14. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  15. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  16. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  17. Leading global projects for professional and accidental project leaders

    CERN Document Server

    Moran, Robert T

    2008-01-01

    This book is a must-read for anyone responsible for projects and initiatives that span functional and geographical divides. Authors Moran and Youngdahl bring extensive experience and learning from industry practice to present a clear and straightforward treatment of the leadership skills and knowledge required to lead projects that are global in nature. They have written the first book of its kind to address the three essential skills of global project leaders - strategic project management, project leadership, and cross-cultural leadership. The authors argue that global project leadership is an essential skill in our project-based world and that we are all either intentional or accidental project leaders. Intentional project leaders pursue formal project management education and even certification whereas accidental project leaders find themselves leading global projects and initiatives as a result of a special assignment or promotion. Moran and Youndahl have found that the vast majority of global projects ...

  18. Instituteur(-trice) néerlandais(e) recherché(e) - French version only

    CERN Multimedia

    2003-01-01

    La section néerlandophone du Lycée International de Ferney-Voltaire est à la recherche d'un instituteur(-trice) diplômé(e) pour enseigner le néerlandais tous les mardis après-midis. Il s'agit d'élèves de 8 et 9 ans et c'est pour le néerlandais comme langue maternelle. Pour plus de renseignements vous pouvez contacter Eric van Herwijnen, tel 79887 ou par e-mail : eric.van.herwijnen@cern.ch Onderwijzer(es) Nederlands gezocht De Nederlandse sectie van het Internationale Lyceum te Ferney-Voltaire is op zoek naar een bevoegde onderwijzer(es) voor het geven van Nederlandse les aan leerlingen van 8 en 9 jaar. Het betreft elke dinsdag-middag. Voor meer informatie kunt U contact opnemen met Eric van Herwijnen, tel : 79887 of per e-mail : eric.van.herwijnen@cern.ch

  19. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  20. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  1. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  2. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  3. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  4. Reaction-Based Reactive Transport Modeling of Iron Reduction and Uranium Immobilization at Area 2 of the NABIR Field Research Center

    Energy Technology Data Exchange (ETDEWEB)

    Burgos, W.D.

    2009-09-02

    This report summarizes research conducted in conjunction with a project entitled “Reaction-Based Reactive Transport Modeling of Iron Reduction and Uranium Immobilization at Area 2 of the NABIR Field Research Center”, which was funded through the Integrative Studies Element of the former NABIR Program (now the Environmental Remediation Sciences Program) within the Office of Biological and Environmental Research. Dr. William Burgos (The Pennsylvania State University) was the overall PI/PD for the project, which included Brian Dempsey (Penn State), Gour-Tsyh (George) Yeh (Central Florida University), and Eric Roden (formerly at The University of Alabama, now at the University of Wisconsin) as separately-funded co-PIs. The project focused on development of a mechanistic understanding and quantitative models of coupled Fe(III)/U(VI) reduction in FRC Area 2 sediments. The work builds on our previous studies of microbial Fe(III) and U(VI) reduction, and was directly aligned with the Scheibe et al. ORNL FRC Field Project at Area 2.

  5. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  6. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  7. Wisdom for Building the Project Manager/Project Sponsor Relationship: Partnership for Project Success

    National Research Council Canada - National Science Library

    Patton, Nanette; Shechet, Allan

    2007-01-01

    .... This article discusses conventional roles and responsibilities of the project sponsor and then discusses strategies a project manager can employ to define boundaries to reduce role confusion and promote partnership to facilitate project success.

  8. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  9. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  10. A Behavioral Model of the Determinants of Personnel Turnover in the Enlisted Reserve of the U.S. Navy.

    Science.gov (United States)

    1982-10-01

    Jackson, "Issues, Party Choices, and Presidential Votes," American Journal of Political Science 19 (1975), pp. 161-185; Eric A. Hanushek and John E...Impact. Lexington, Mass.: Lexington Books, 1981. Handy, L.B. Understanding Organizations. London: Penguin Books, 1978. Hanushek , Eric A. and John E

  11. Commander’s Impact on Preventing Disease During Military Conflicts

    Science.gov (United States)

    1992-06-05

    Since the Eighteenth Century (Bloomington, IN: Indiana University Press, 1984), pp. 60-62. 3Eric A. Hanushek and John E. Jackson, Statistical Methods...Doctors in Gray. Baton Rouge, Louisiana State University Press, 1958. Hanushek , Eric A. and John E. Jackson. Statistical Methods for Social Scientist. New

  12. How Google works

    CERN Document Server

    Schmidt, Eric; Eagle, Alan

    2014-01-01

    Google Executive Chairman and ex-CEO Eric Schmidt and former SVP of Products Jonathan Rosenberg came to Google over a decade ago as proven technology executives. At the time, the company was already well-known for doing things differently, reflecting the visionary--and frequently contrarian--principles of founders Larry Page and Sergey Brin. If Eric and Jonathan were going to succeed, they realized they would have to relearn everything they thought they knew about management and business. Today, Google is a global icon that regularly pushes the boundaries of innovation in a variety of fields. HOW GOOGLE WORKS is an entertaining, page-turning primer containing lessons that Eric and Jonathan learned as they helped build the company. The authors explain how technology has shifted the balance of power from companies to consumers, and that the only way to succeed in this ever-changing landscape is to create superior products and attract a new breed of multifaceted employees whom Eric and Jonathan dub "smart creat...

  13. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  14. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  15. Organization of BSc and MSc projects in project families

    DEFF Research Database (Denmark)

    Ottosen, Lisbeth M.; Goltermann, Per; Jensen, Pernille Erland

    2014-01-01

    This work reports organization of student thesis projects in project families, with the benefit to both teaching and learning. The project organization went from student projects broadly distributed on topics related to different research issues and individual supervision to project families with...

  16. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  17. Multiple levels in the organisation of innovation : project organization in single-firm projects and multi-firm projects

    NARCIS (Netherlands)

    Jaspers, F.P.H.; Ende, van den J.C.M.; Borgh, van der W.; Yin, Jie

    2008-01-01

    Studies about how the organization of new product (and new service) development projects (NPD) projects influences project performance typically investigate this in Single-firm projects, i.e. projects with high ownership integration. However, NPD projects are often performed by two or more

  18. Design and Planning of Field Campaigns

    DEFF Research Database (Denmark)

    Palmgren, F.

    1996-01-01

    From Proceedings of the NATO Advanced Research Workshop Monitoring and Control Strategies for Urban Air Pollution, held in Erice, Italy, October 9-15, 1994......From Proceedings of the NATO Advanced Research Workshop Monitoring and Control Strategies for Urban Air Pollution, held in Erice, Italy, October 9-15, 1994...

  19. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  20. Project financing

    International Nuclear Information System (INIS)

    Alvarez, M.U.

    1990-01-01

    This paper presents the basic concepts and components of the project financing of large industrial facilities. Diagrams of a simple partnership structure and a simple leveraged lease structure are included. Finally, a Hypothetical Project is described with basic issues identified for discussion purposes. The topics of the paper include non-recourse financing, principal advantages and objectives, disadvantages, project financing participants and agreements, feasibility studies, organization of the project company, principal agreements in a project financing, insurance, and an examination of a hypothetical project

  1. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  2. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  3. Locale-Specific Categorization of IT Projects for Proper Project Management

    Directory of Open Access Journals (Sweden)

    Muhammad Nasir

    2015-12-01

    Full Text Available In this paper we aim to show that not only are the project management techniques important for small-scale projects, but following proper project management techniques is one of the most important requirements. However, there come slight variations in implementing project management techniques in small projects as compared with larger projects. Therefore, proper categorization of projects holds the key to success in many situations. Our paper will show that categorization of a project as small-scale or large-scale should always be locale specific. In this regards, we develop a criteria and evaluate how the projects are categorized as small-scale and large-scale in different parts of the world with focus on IT projects. This research concludes that some methods cannot be used for projects of different scales.

  4. A consultant paediatrician led and public health nurse (PHN) provided Community Enuresis Clinic as a model of care.

    LENUS (Irish Health Repository)

    Noone, D

    2011-02-01

    A dedicated Community Enuresis Clinic was established in 2004 in Cavan and Monaghan. The service was audited using ERIC (Education and Resources for Improving Childhood Continence) guidelines. There were 106 males and 47 females, giving an M: F ratio of 2.3:1. Monosymptomatic Nocturnal Enuresis (MNE) accounted for 127 (83%). Adequate follow-up was available for 108 children with MNE and in this group Initial Success was 49% (ERIC target 50%). 71% were dry at 1 year. There was a dropout rate of 20% in the MNE group (ERIC minimum standard < 25%). We believe the structure of this community based clinic and its approach to MNE management has been successful.

  5. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  6. Improving Project Portfolio Management (PPM) for Improvement Projects

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Jakobsen, Peter M.; Korsaa, Morten

    2017-01-01

    Project Portfolio Management (PPM) focus on the integration and alignment of projects with the business operation in order to achieve most value and cost-efficiency for the investment in projects. PPM is often a challenge and especially so for improvement projects where PPM is considerably...... of evaluating a portfolio of improvement projects and combine this evaluation with the effect they have on the CMMI maturity level. Further, the paper demonstrates how the combination of a strong senior management requirement for improved maturity and the focus on getting the most value out of PPM made...

  7. Trade (Marketing): Occupational Cluster Series-6.

    Science.gov (United States)

    Miller, David H., Comp.; Moore, Allen B., Comp.

    This compilation of ERIC abstracts dealing with trade is the sixth in a series that identifies research and instructional materials in selected occupational clusters. Fifty-seven documents were identified by means of computer searches of "Research in Education" from 1967 to December 1972. Instructions on how to use ERIC reference…

  8. The Psychosocial Experiences of a Student with Low Vision

    Science.gov (United States)

    George, Anne L.; Duquette, Cheryll

    2006-01-01

    This article presents an in-depth case study of the psychosocial experiences of Eric, a student with low vision, who is enjoying social success in his neighborhood school. It explores the factors that contribute to Eric's social successes at school and in the community and presents a model for inclusion.

  9. Creativity abhors prescription

    Science.gov (United States)

    Kurt Riitters

    2011-01-01

    Eric Gustafson (2011) has initiated a discussion aimed at advancing the field of landscape ecology by revising scientific publication formats including better use of information technology. I empathize with Eric - it is difficult to determine quickly if a paper is worth reading, and some papers were not worth reading after all.

  10. The Federal Role in Improving Elementary and Secondary Education

    Science.gov (United States)

    1993-05-01

    provided by Paul Cullinan, Richard Elmore, Eric Hanushek , Deborah Kalcevic, and Constance Rhind. Special thanks for research support are due to Julia...spending for educa- 2. See Eric A. Hanushek , "The Impact of Different.a! Ex- tion among the states may not be the result of penditures on School Performance

  11. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  12. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  13. Dynamic simulation of a pumping system using the wind power and determination of the aeolian resources; Simulacion dinamica de un sistema de bombeo utilizando la potencia del viento y determinacion de recursos eolicos

    Energy Technology Data Exchange (ETDEWEB)

    Velasco Lozano, Miguel

    2002-05-15

    The present investigation project pretends toward analyze the possibility of pumping water using Aeolian energy from the Soto la Marina River to the Contadero Lagoon, through an eight kilometers channel. In order to obtain this objective it is necessary to analyze diverse configurations for Aeolian energy converters as well as to determine the Aeolian potential of the site. An isolated Aeolian energy pumping system will be analyzed, that is to say, without interconnection with the electric power network and another interconnected with this network. In addition, with the installation of meteorological monitoring stations a partial evaluation of the Aeolian resource in the zone will be made. This research project was born as a result of an invitation of the Dr. Eric Gustafson, President of Conservation Mexico A.C. and of Ing. Virgilio Garza, President of the Vigia Group, to participate in a project called Laguna Flamingo. Such project deals with the restoration of a habitat of aquatic birds in the Contadero Lagoon, property of Ing. Virgilio Garza in Soto la Marina, Tamaulipas, Mexico. [Spanish] El presente proyecto de investigacion pretende analizar la posibilidad de bombear agua utilizando energia eolica desde el rio Soto La Marina hasta la laguna Contadero, a traves de un canal de 8 km. Para lograr este objetivo es necesario analizar diversas configuraciones de convertidores de energia eolica asi como determinar el potencial eolico del sitio. Se analizara un sistema de bombeo con energia eolica operando aislado, es decir, sin interconexion con la red electrica y otro interconectado con dicha red. Ademas, con la instalacion de estaciones de monitoreo meteorologico se realizara una evaluacion parcial del recurso eolico en la zona. Este proyecto de investigacion nacio a raiz de una invitacion del Dr. Eric Gustafson, Presidente de Conservacion Mexico A.C. y del Ing. Virgilio Garza, Presidente del grupo Vigia, para participar en un proyecto llamado Laguna Flamingo. Tal

  14. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    Science.gov (United States)

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  15. Project descriptions

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    This part specifies the activities and project tasks of each project broken down according to types of financing, listing the current projects Lw 1 through 3 funded by long-term provisions (budget), the current projects LB 1 and 2, LG 1 through 5, LK1, LM1, and LU 1 through 6 financed from special funds, and the planned projects ZG 1 through 4 and ZU 1, also financed from special funds. (DG) [de

  16. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    Science.gov (United States)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  17. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  18. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  19. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  20. 40 CFR 258.41 - Project XL Bioreactor Landfill Projects.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Project XL Bioreactor Landfill... WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Design Criteria § 258.41 Project XL Bioreactor Landfill Projects. (a) Buncombe County, North Carolina Project XL Bioreactor Landfill Requirements...

  1. Virtual projects

    DEFF Research Database (Denmark)

    Svejvig, Per; Commisso, Trine Hald

    2012-01-01

    that the best practice knowledge has not permeated sufficiently to the practice. Furthermore, the appropriate application of information and communication technology (ICT) remains a big challenge, and finally project managers are not sufficiently trained in organizing and conducting virtual projects....... The overall implications for research and practice are to acknowledge virtual project management as very different to traditional project management and to address this difference.......Virtual projects are common with global competition, market development, and not least the financial crisis forcing organizations to reduce their costs drastically. Organizations therefore have to place high importance on ways to carry out virtual projects and consider appropriate practices...

  2. Project development symposium

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  3. Project Temporalities

    DEFF Research Database (Denmark)

    Tryggestad, Kjell; Justesen, Lise; Mouritsen, Jan

    2013-01-01

    Purpose – The purpose of this paper is to explore how animals can become stakeholders in interaction with project management technologies and what happens with project temporalities when new and surprising stakeholders become part of a project and a recognized matter of concern to be taken...... into account. Design/methodology/approach – The paper is based on a qualitative case study of a project in the building industry. The authors use actor-network theory (ANT) to analyze the emergence of animal stakeholders, stakes and temporalities. Findings – The study shows how project temporalities can...... multiply in interaction with project management technologies and how conventional linear conceptions of project time may be contested with the emergence of new non-human stakeholders and temporalities. Research limitations/implications – The study draws on ANT to show how animals can become stakeholders...

  4. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  5. Genotypic Characterization of Escherichia coli O157:H7 Isolates from Different Sources in the North-West Province, South Africa, Using Enterobacterial Repetitive Intergenic Consensus PCR Analysis

    Directory of Open Access Journals (Sweden)

    Collins Njie Ateba

    2014-05-01

    Full Text Available In many developing countries, proper hygiene is not strictly implemented when animals are slaughtered and meat products become contaminated. Contaminated meat may contain Escherichia coli (E. coli O157:H7 that could cause diseases in humans if these food products are consumed undercooked. In the present study, a total of 94 confirmed E. coli O157:H7 isolates were subjected to the enterobacterial repetitive intergenic consensus (ERIC polymerase chain reaction (PCR typing to generate genetic fingerprints. The ERIC fragments were resolved by electrophoresis on 2% (w/v agarose gels. The presence, absence and intensity of band data were obtained, exported to Microsoft Excel (Microsoft Office 2003 and used to generate a data matrix. The unweighted pair group method with arithmetic mean (UPGMA and complete linkage algorithms were used to analyze the percentage of similarity and matrix data. Relationships between the various profiles and/or lanes were expressed as dendrograms. Data from groups of related lanes were compiled and reported on cluster tables. ERIC fragments ranged from one to 15 per isolate, and their sizes varied from 0.25 to 0.771 kb. A large proportion of the isolates produced an ERIC banding pattern with three duplets ranging in sizes from 0.408 to 0.628 kb. Eight major clusters (I–VIII were identified. Overall, the remarkable similarities (72% to 91% between the ERIC profiles for the isolate from animal species and their corresponding food products indicated some form of contamination, which may not exclude those at the level of the abattoirs. These results reveal that ERIC PCR analysis can be reliable in comparing the genetic profiles of E. coli O157:H7 from different sources in the North-West Province of South Africa.

  6. Genotypic characterization of Escherichia coli O157:H7 isolates from different sources in the North-West Province, South Africa, using enterobacterial repetitive intergenic consensus PCR analysis.

    Science.gov (United States)

    Ateba, Collins Njie; Mbewe, Moses

    2014-05-30

    In many developing countries, proper hygiene is not strictly implemented when animals are slaughtered and meat products become contaminated. Contaminated meat may contain Escherichia coli (E. coli) O157:H7 that could cause diseases in humans if these food products are consumed undercooked. In the present study, a total of 94 confirmed E. coli O157:H7 isolates were subjected to the enterobacterial repetitive intergenic consensus (ERIC) polymerase chain reaction (PCR) typing to generate genetic fingerprints. The ERIC fragments were resolved by electrophoresis on 2% (w/v) agarose gels. The presence, absence and intensity of band data were obtained, exported to Microsoft Excel (Microsoft Office 2003) and used to generate a data matrix. The unweighted pair group method with arithmetic mean (UPGMA) and complete linkage algorithms were used to analyze the percentage of similarity and matrix data. Relationships between the various profiles and/or lanes were expressed as dendrograms. Data from groups of related lanes were compiled and reported on cluster tables. ERIC fragments ranged from one to 15 per isolate, and their sizes varied from 0.25 to 0.771 kb. A large proportion of the isolates produced an ERIC banding pattern with three duplets ranging in sizes from 0.408 to 0.628 kb. Eight major clusters (I-VIII) were identified. Overall, the remarkable similarities (72% to 91%) between the ERIC profiles for the isolate from animal species and their corresponding food products indicated some form of contamination, which may not exclude those at the level of the abattoirs. These results reveal that ERIC PCR analysis can be reliable in comparing the genetic profiles of E. coli O157:H7 from different sources in the North-West Province of South Africa.

  7. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  8. Storytelling in Projects

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas; Andersen, Peter Bøgh

    2006-01-01

    project managers should not only be concerned with project plans, but also with project stories. In this paper we explore some basic principles for transforming project plans into appealing stories. We discuss what may happen to stories once they are released into public space. And we illustrate how......Plans and stories are two different ways of communicating about projects. Project plans are formalized descriptions, primarily supporting coordination. Project stories are accounts whose primary function is emotional appeal. Project stories influence the projects’ chances of success. Therefore...... the possibilities of telling favorable stories may have repercussions on the project planning....

  9. Experiences of project developers around CDM projects in South Africa

    International Nuclear Information System (INIS)

    Thurner, Thomas W.; Varughese, Arun

    2013-01-01

    Project developers in South Africa are puzzled with the long process of evaluating and registering their CDM projects. In addition to other obstacles, we find that South African big businesses are rather reluctant to engage in any new business activities such as CDM projects and municipalities often lack the necessary flexibility. This offers opportunities for small-scale project developers who spot the opportunities and find creative solutions to overcome these difficulties. - Highlights: • First paper analysing the experience of small project developers in South Africa. • Project developers in South Africa are puzzled with the long process. • South African big businesses are reluctant to engage in CDM projects. • Small-scale project developers spot opportunities and find creative solutions to overcome difficulties. • Also, we saw learning processes of South African administration in support of CDM projects

  10. MATCHING CONFIGURATIONS PROJECTS OF COOPERATIVE MILK COLLECTION PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Анатолій Миколайович ТРИГУБА

    2017-03-01

    Full Text Available The condition analysis of dairy farming is done and the reasons for its degradation are revealed. The need of technologically integrated production systems projects, harvesting, and processing of milk are substantiated. A scientific methodology and the method of project design of milk provision cooperative coordination in the community of the project environment, which are based on systematic-evaluative approach and simulation are proposed. The criterion for the definition of rational parameters of objects configuration for milk provision cooperative projects in the community system is the maximum value of their product. The monetary functioning assessment of the configuration object of cooperative milk provision projects in the community is done. On the basis of the proposed method, we performed the coordination of project configuration of milk provision cooperative with the project environment of territory Zabolotsi community in Brody district of Lviv region.

  11. Project 2010 Bible

    CERN Document Server

    Marmel, Elaine

    2010-01-01

    A comprehensive reference on the latest version of the leading enterprise project management software: Microsoft Project 2010. Microsoft Project allows users to manage business activities effectively by sharing project information, performing modeling and scenario analyses, standardizizing reporting processes, and more. This soup-to-nuts reference covers both the professional and standard versions of the latest iteration of Microsoft Project, as well as Project Server, so that you can efficiently manage your business projects. Veteran author Elaine Marmel begins with an overview of project man

  12. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...... organized, agile projects. Based on the proposed definition popular existing definitions are discussed....

  13. Project Management Methods in Projects Co-financed by EU Funds

    OpenAIRE

    Kostalova, Jana; Tetrevova, Libena; Patak, Michal

    2017-01-01

    This paper deals with the management of projects co-financed by European Union funds (structural funds and the Cohesion Fund) in the Czech Republic (EU projects). The authors aimed to analyze and assess the scope of familiarity with basic project management methods and their application within the implementation of EU projects in the Czech Republic in the Programming Period 2007–2013. Based on a questionnaire survey of EU project organisers, the authors evaluate their attitudes to project man...

  14. The impact of project marketing on the projects finality

    Directory of Open Access Journals (Sweden)

    Oxana SAVCIUC

    2015-06-01

    Full Text Available In the last years we assist at the level of the Republic of Moldova and also at international level at a trend to offer financial support with a special focus on project-based funding. Once with the appearance and development of the project concept, other related concepts are being developed such as project management or newly, we can also speak about the projects marketing. Until recently, the product marketing was intensely discussed; concepts such as services marketing appeared afterwards, but also the specific marketing for various branches, such as agromarketing, political marketing, etc. Given that fact that the projects are a product / service itself, at the moment, more and more often projects marketing is discussed.

  15. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  16. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    Science.gov (United States)

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  17. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  18. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  19. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  20. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  1. PACTEL OECD project planning (PACO). PACTEL OECD project planning

    Energy Technology Data Exchange (ETDEWEB)

    Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)

    2004-07-01

    OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a

  2. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  3. Microsoft project

    OpenAIRE

    Markić, Lucija; Mandušić, Dubravka; Grbavac, Vitomir

    2005-01-01

    Microsoft Project je alat čije su prednosti u svakodnevnom radu nezamjenjive. Pomoću Microsoft Projecta omogućeno je upravljanje resursima, stvaranje izvještaja o projektima u vremenu, te analize različitih scenarija. Pojavljuje u tri verzije: Microsoft Project Professional, Microsoft Project Server i Microsoft Project Server Client Access Licenses. Upravo je trend da suvremeni poslovni ljudi zadatke povjeravaju Microsoft Projectu jer on znatno povećava produktivnost rada. Te prednos...

  4. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  5. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Gerstrøm, Anna; Frederiksen, Signe Hedeboe

    The Half Double mission: Project Half Double has a clear mission. We want to succeed in finding a project methodology that can increase the success rate of our projects while increasing the development speed of new products and services. We are convinced that by doing so we can strengthen...... the competitiveness of Denmark and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “Projects in half the time with double the impact” where projects in half the time should be understood as half the time to impact (benefit realization, effect is achieved......) and not as half the time for project execution. The Half Double project journey: It all began in May 2013 when we asked ourselves: How do we create a new and radical project paradigm that can create successful projects? Today we are a movement of hundreds of passionate project people, and it grows larger...

  6. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  7. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  8. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  9. Influence of organizational and project cultures on project success

    Directory of Open Access Journals (Sweden)

    Berdykulova G. M.

    2017-10-01

    Full Text Available the article is dedicated to studying the influence of organizational and project cultures on effective project management of the company by knowledge systematization and the comparative analysis of world companies’ practice that allowed to reveal the main factors and criteria of projects success and negative influence of organizational culture on the project; key aspects of corporate culture and cultural integration under the conditions of globalization.

  10. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  11. Does Lean & Agile Project Management Help Coping with Project Complexity?

    NARCIS (Netherlands)

    Jalali Sohi, A.; Hertogh, M.J.C.M.; Bosch-Rekveldt, M.G.C.; Blom, R.; Serpell, A.; Ferrada, X.

    2016-01-01

    Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project

  12. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  13. Project ethics

    CERN Document Server

    Jonasson, Haukur Ingi

    2013-01-01

    How relevant is ethics to project management? The book - which aims to demystify the field of ethics for project managers and managers in general - takes both a critical and a practical look at project management in terms of success criteria, and ethical opportunities and risks. The goal is to help the reader to use ethical theory to further identify opportunities and risks within their projects and thereby to advance more directly along the path of mature and sustainable managerial practice.

  14. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  15. Review of Department of Defense Education Activity (DODEA) Schools. Volume I: Main Report and Appendixes

    Science.gov (United States)

    2000-10-01

    extracted.1 Hanushek in 1971 investigated the relationship between the achievement of California third graders and the characteristics of their second...Dale Ballou and Michael Podgursky, Teacher Pay and Teacher Quality (Kalamazoo, Michigan: W.E. Upjohn Institute, 1997), p. 9. 2 Eric Hanushek ...Carolina and Texas, National Education Goals Panel, November 1998 Hanushek , Eric A., “Teacher Characteristics and Gains in Student Achievement

  16. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  17. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Ehlers, Michael; Adland, Karoline Thorp

    activities carried out within the framework of the projects. The formal part of Project Half Double was initiated in June 2015. We started out by developing, refining and testing the Half Double methodology on seven pilot projects in the first phase of the project, which will end June 2016. The current......Project Half Double has a clear mission to succeed in finding a project methodology that can increase the success rate of our projects while increasing the speed at which we generate new ideas and develop new products and services. Chaos and complexity should be seen as a basic condition...... and as an opportunity rather than a threat and a risk. We are convinced that by doing so, we can strengthen Denmark’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “projects in half the time with double the impact”, where projects in half the time...

  18. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  19. REPNET: project scheduling and workflow optimization for Construction Projects

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM.Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project.

  20. Capital projects coordination

    Directory of Open Access Journals (Sweden)

    Zubović Jovan

    2004-01-01

    Full Text Available This paper looks at the difficulties of managing modem capital projects and endeavors to reduce the complexities to simpler and more understandable terms. It examines the project environment, defines project management and discusses points of difference from traditional management. In the second part of the paper are presented fundamentals for project success for different types of projects.

  1. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  2. The ICOS Experience: Integration of Multi-disciplinary Data and Beyond Its Domains Into a Network of Networks

    Science.gov (United States)

    Vermeulen, A. T.; Hellström, M.; Mirzov, O.; Juurola, E.; Lavric, J. V.; Kutsch, W. L.

    2016-12-01

    ICOS as long-term observational system for the carbon cycle has a long history in Europe, but has only recently been established formally as one of the first European Research Infrastructure Consortia (ERIC). ICOS data will be provided through the ICOS Carbon Portal and data usage will be absolutely unrestricted under the Creative Commons Attribution 4.0 International (CC4.0BY) license. ICOS strives to further integrate its data streams internally across the domains and externally, building on scalable open access tools and open data technologies. Through the ENVRIplus project, led by ICOS, and the EUDAT2020 project, the work on interoperability and scalability is now progressing quickly in the European environmental Research Infrastructures domain. In this presentation we will demonstrate the recent progress in ICOS in implementing the Carbon Portal as the one stop shop for ICOS data.

  3. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  4. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  5. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  6. Overlapping Boundaries of the Project Time Management and Project Risk Management

    Directory of Open Access Journals (Sweden)

    Marius PODEAN

    2010-01-01

    Full Text Available Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote character around the deadline for project completion. In extreme situations, the utility function itself may fall under zero (projects may generate losses to both constructor and customer. Existing risk analysis methodologies observe risks from monetary terms. The typical risks are correlated with an increase in final project costs. In order to estimate harddeadline milestones and/or end of projects or programme is critical to employ the time dimension rather than the typical cost-based risk analysis. Here, we comprehensively describe a structured methodology that focuses on minimizing and mitigating project specific delay risks. The method may supplement existing cost-based risk analysis in projects. We aim to elegantly combine moderation techniques to reveal the intrinsic risk of the projects. In addition to the technical risks, the moderation techniques are able to bring evidence of risks as the team efficacy, diverse un-correlations or miss-understanding about the roles of the team members in the team – most of the project soft risk. Described methodology encourages the common understanding of risks for participants, crystallizing the essence of what can go wrong in complex situations and where the opportunities can be unlocked.

  7. The USE Project

    DEFF Research Database (Denmark)

    Frøkjær, E.; Hornbæk, K.; Høegh, Rune Thaarup

    2006-01-01

    This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University and Copenha......This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University...... and Copenhagen University, and developers and managers working in software development organizations....

  8. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  9. Final Project Report Project 10749-4.2.2.1 2007-2009

    Energy Technology Data Exchange (ETDEWEB)

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  10. Heavy Metals Contaminated Soil Project, Resource Recovery Project, and Dynamic Underground Stripping Project

    International Nuclear Information System (INIS)

    1994-02-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November, 1989. OTD has begun to search out, develop, test and demonstrate technologies that can now or in the future be applied to the enormous remediation problem now facing the DOE and the United States public in general. Technology demonstration projects have been designed to attack a separate problem as defined by DOE. The Heavy Metals Contaminated Soil Project was conceived to test and demonstrate off-the-shelf technologies (dominantly from the mining industry) that can be brought to bear on the problem of radionuclide and heavy metal contamination in soils and sediments. The Resource Recovery Project is tasked with identifying, developing, testing, and evaluating new and innovative technologies for the remediation of metal contaminated surface and groundwater. An innovative twist on this project is the stated goal of recovering the metals, formerly disposed of as a waste, for reuse and resale, thereby transforming them into a usable resource. Finally, the Dynamic Underground Stripping Project was developed to demonstrate and remediate underground spills of hydrocarbons from formations that are (1) too deep for excavation, and/or (2) require in-situ remediation efforts of long duration. This project has already been shown effective in reducing the time for remediation by conventional methods from an estimated 200 years at the Lawrence Livermore National Laboratory (LLNL) to less than one year. The savings in time and dollars from this technology alone can be immeasurable

  11. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  12. Ecology and Population Structure of Vibrionaceae in the Coastal Ocean

    Science.gov (United States)

    2010-02-01

    mussels filter water (containing zooplankton) and crabs preferentially consume mussels but have alternative food sources. The blue background color...clonal expansion, was especially pronounced in crab and zooplankton samples. Specialization, demonstrated by specific and reproducible association with...Martin deserves credit for cultivating a creative and collaborative lab environment. I’m very grateful to Eric Alm for all of his help. Eric has been an

  13. Reflexive project management in high-abition projects

    NARCIS (Netherlands)

    Loeber, Anne; Vermeulen, T.

    2016-01-01

    Purpose
    The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  14. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  15. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  16. The role of project planning in project management

    OpenAIRE

    Klitsenko, A. I.; Клиценко, А. И.

    2013-01-01

    This article describes the importance of the process of project planning. The author gives irrefutable arguments concerning crucial role of project planning. This article presents the definition, objects and the main goal of project planning. The purpose of this article is to review such objects of project planning as project scope, risk and human resources. Данная статья описывает важность процесса проектного планирования. Автор дает неопровержимые доводы, касающиеся решающей роли проектн...

  17. ASP project. Dissolved oxygen issues in ASP project

    Directory of Open Access Journals (Sweden)

    M.Y. Bondar

    2018-03-01

    Full Text Available The article presents the latest results of studies about the effect of dissolved oxygen on the efficiency of the ASP flooding project implemented by Salym Petroleum Development N.V.. Pilot project on experimental injection of anionic surfactant solutions, soda and polymer into the reservoir for enhanced oil recovery (ASP project has been implemented since 2016. The stability of one of the components of the ASP polymer is strongly dependent on the presence of iron, stiffness cations and dissolved oxygen in the water. Since the polymer is used for injection at two stages of the project, which are essential and the longest, at the design stage of ASP project a whole complex of polymer protection had been established against negative factors, in particular from the influence of oxygen, which causes not only oxygen corrosion but also irreversible destruction polymer chains. In the paper, studies on the stability of polymer solutions are described, an analysis of viscosity loss with time in the presence of iron and oxygen for polymer solutions is carried out. The choice of chemical deoxygenation method for the control of dissolved oxygen is substantiated. The program of laboratory studies of the ASP project and the analytical instruments used are described. The technological scheme of the ASP process is presented, and recommendations for the implementation of the technology are given.

  18. Projective geometry and projective metrics

    CERN Document Server

    Busemann, Herbert

    2005-01-01

    The basic results and methods of projective and non-Euclidean geometry are indispensable for the geometer, and this book--different in content, methods, and point of view from traditional texts--attempts to emphasize that fact. Results of special theorems are discussed in detail only when they are needed to develop a feeling for the subject or when they illustrate a general method. On the other hand, an unusual amount of space is devoted to the discussion of the fundamental concepts of distance, motion, area, and perpendicularity.Topics include the projective plane, polarities and conic sectio

  19. Projective measure without projective Baire

    DEFF Research Database (Denmark)

    Schrittesser, David; Friedman, Sy David

    We prove that it is consistent (relative to a Mahlo cardinal) that all projective sets of reals are Lebesgue measurable, but there is a ∆13 set without the Baire property. The complexity of the set which provides a counterexample to the Baire property is optimal.......We prove that it is consistent (relative to a Mahlo cardinal) that all projective sets of reals are Lebesgue measurable, but there is a ∆13 set without the Baire property. The complexity of the set which provides a counterexample to the Baire property is optimal....

  20. Project Planning and Implementation: Lessons Learned From the AQBMP Project

    National Research Council Canada - National Science Library

    1997-01-01

    ...). This NSRP report is funded as an addendum to the Air Quality Best Management Practices (AQBMP) project (N1 -944). The AQBMP project was completed using an intensive project planning process using a variety of quality management tools...

  1. One project's waste is another project's resource

    International Nuclear Information System (INIS)

    Short, J.

    1997-01-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables

  2. Ambidextrous Leadership and Sustainability-Based Project Performance: The Role of Project Culture

    Directory of Open Access Journals (Sweden)

    Junwei Zheng

    2017-12-01

    Full Text Available Most studies in the project management field emphasized the effects of leaders or managers, but these effects have rarely been examined at the project level. To cover this research gap, this study applies organizational ambidexterity theory to examine the effects among ambidextrous leadership, ambidextrous culture and sustainability-based project performance. Using a valid sample of 217 project leaders and members from Chinese construction projects, the method of multiple linear regression was adopted to assess the direct relationship among ambidextrous leadership, ambidextrous culture and project performance. Moreover, the bootstrapping technique through structural equation modeling, has been used to analyze the mediating effect of ambidextrous culture. Additionally, the sample data was divided into different groups according to the median value of the variables to conduct the ANOVA and to assess the within-group differences. The results indicated a positive and direct relationship that ambidextrous leadership has on project performance and ambidextrous culture. In addition, there was also a mediating impact of ambidextrous leadership on project performance via ambidextrous culture. Thus, ambidextrous leadership combined with transformational leadership as well as transactional leadership likely has a stronger positive impact on project performance through fostering the adaptive culture and consistent culture. Our findings contribute to an in-depth understanding of the role of the leader and culture for project outcomes. The project-based organization in construction projects could train project leaders’ ambidextrous leadership behavior to facilitate the formation of an ambidextrous culture and to increase project performance. Moreover, this study enriches the existing literature on leadership and project management by highlighting the important path of ambidextrous leadership and ambidextrous culture on the performance at the project level

  3. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  4. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  5. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  6. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  7. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  8. Project 2010 For Dummies

    CERN Document Server

    Muir, Nancy C

    2010-01-01

    A friendly reference guide to Microsoft Project, the leading enterprise project management software. As project management software, Microsoft Project allows you to oversee your business activities effectively. You can manage resources, share project info, perform modeling and scenario analysis, and standardize reporting processes. This easy-to-understand guide is completely updated to cover the latest changes and newest enhancements to Project 2010 and shows you how to get Project 2010 to work for you. After an introduction to basic project management concepts, you'll discover the mechanics o

  9. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  10. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  11. Marlim project finance; 'Project finance' de Marlim

    Energy Technology Data Exchange (ETDEWEB)

    D' Almeida, Albino Lopes [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    Project Finance is often used worldwide to raise the funds to develop big projects, particularly in the area of power and infra-structure. It is designed to support a singular project and a specific purpose company is created to obtain the financing. The debt payment is secured by the enterprise's cash flow, avoiding real guarantee requirements. The lenders receive the future revenues and the property of the assets to be built. The risks are mitigated by agreements exhaustively negotiated among the parties. One of the most important Project Finances performed in Brazil is the Marlim Project, structured in order to complete the development of the Marlim oil field. This is the biggest Brazilian oil field, producing more than 500,000 barrels a day, almost 35% of the national production. This paper presents the general concepts related to this type of financing and general information about the project, including its structuring, negotiation and closing. The total commitment reaches US$ 1.5 billion obtained in both domestic and international markets through equity, bridge loan, bonds and commercial papers. Its whole life is 10 years, using 2 special purpose companies in its configuration. (author)

  12. Project Decision Chain

    DEFF Research Database (Denmark)

    Rolstadås, Asbjørn; Pinto, Jeffrey K.; Falster, Peter

    2015-01-01

    To add value to project performance and help obtain project success, a new framework for decision making in projects is defined. It introduces the project decision chain inspired by the supply chain thinking in the manufacturing sector and uses three types of decisions: authorization, selection......, and plan decision. A primitive decision element is defined where all the three decision types can be accommodated. Each task in the primitive element can in itself contain subtasks that in turn will comprise new primitive elements. The primitive elements are nested together in a project decision chain....

  13. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  14. Pilot Project: analysis, development and projection

    OpenAIRE

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  15. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  16. EBFA project

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    An engineering project office was established during the fall of 1976 to manage and coordinate all of the activities of the Electron Beam Fusion Project. The goal of the project is to develop the Electron Beam Fusion Accelerator (EBFA) and its supporting systems, and integrate these systems into the new Electron Beam Fusion Facility (EBFF). Supporting systems for EBFA include a control/monitor system, a data acquistion/automatic data processing system, the liquid transfer systems, the insulating gas transfer systems, etc. Engineers and technicians were assigned to the project office to carry out the engineering design, initiate procurement, monitor the fabrication, perform the assembly and to assist the pulsed power research group in the activation of the EBFA

  17. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    Science.gov (United States)

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  18. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  19. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  20. The Ethiopian Flora Project

    DEFF Research Database (Denmark)

    Demissew, Sebsebe; Brochmann, Christian; Kelbessa, Ensermu

    2011-01-01

    The account reviews and analyses the scietific projects derived from activities in connection with the Ethiopian Flora Project, including the [Ethiopian] Monocot Project, the Afro-alpine "Sky-island" project, the Vegetation and Ecological Conditions of Plantations Project, the Fire Ecology Projec...

  1. Project mechanisms challenges

    International Nuclear Information System (INIS)

    Perthuis, Ch. de

    2005-06-01

    The project mechanism complete the quotas systems concerning the carbon dioxide emissions market. The author explains and discusses these mechanisms and provides a panorama of the existing and developing projects. More specially she brings information on the mechanism of clean developments and renewable energies, the coordinated mechanisms, the agricultural projects, the financing of the projects and the exchange systeme of the New south Wales. (A.L.B.)

  2. J-PARC project

    International Nuclear Information System (INIS)

    Nagamiya, Shoji

    2004-01-01

    From Japanese fiscal year JFY01, which started on April 1, 2001, a new accelerator project to provide high-intensity proton beams proceeded into its construction phase. This project, which is now called the Japan Proton Accelerator Research Complex (J-PARC) project, is conducted under a cooperation of two institutions, KEK and Japan Atomic Energy Research Institution. We set a goal to achieve 1 MW proton beams at 3 GeV and 0.75 MW beams at 50 GeV. The project will be completed within six years, with the anticipated first beams in the spring of 2007. In this article I will describe (a) the project itself, (b) sciences to be pursued at this new accelerator complex and (c) the present status and future plans of the project

  3. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  4. Something of value Governance of Projects in the Project-Based Organisation

    DEFF Research Database (Denmark)

    Riis, Eva

    2013-01-01

    The paper presents a conceptual framework for studying Governance of Projects and issues of value in the project-based organisation. Attempts at exploring and conceptualising the issues in the current literature are reviewed. Issues pertinent to gaining value by Governance of Projects have mainly...... for a better understanding of Governance of Projects and value contribution. The findings presented here form the conceptual foundation for subsequent empirical studies of value by Governance of Projects....... been explored from the perspective of economic theory. Models found in the literature are not typically concerned with value for the implementing organisation as a whole; their scope is limited to the time just after project completion. No valid, empirically-based models of value creation by Governance...

  5. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  6. ORGANIZATION OF FUTURE ENGINEERS' PROJECT-BASED LEARNING WHEN STUDYING THE PROJECT MANAGEMENT METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Halyna V. Lutsenko

    2015-02-01

    Full Text Available The peculiarities of modern world experience of implementation of project-based learning in engineering education have been considered. The potential role and place of projects in learning activity have been analyzed. The methodology of organization of project-based activity of engineering students when studying the project management methodology and computer systems of project management has been proposed. The requirements to documentation and actual results of students' projects have been described in detail. The requirements to computer-aided systems of project management developed by using Microsoft Project in the scope of diary scheduling and resources planning have been formulated.

  7. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  8. Project Leadership and Quality Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    SPG Buba

    2017-05-01

    Full Text Available Background: The construction industry in Nigeria, is pigeonholed by poor quality of construction products as a result of the inherent corruption in the country. Lack of purposeful leadership and inappropriate choice of leadership styles in the industry have been attributed to project failure. Abandoned and failed projects are more predominant in the public sector which litters every corner of the country. Objectives: The objective of this paper is to assess the impact of leadership styles on quality performance criteria of public projects in Nigeria. Methodology: A total of 43 questionnaires were distributed to 3 key groups of respondents (Quantity Surveyors, Builders, and Architects who are project managers in Nigeria. Descriptive and Inferential statistics were used to analyse the data using the Statistical Package for Social Sciences (SPSS. Likert Scale was used to measure the independent variables (leadership style: facilitative, coaching, delegating and directing; and the level of achievement of projects based on the dependent variables (quality and function performance criteria which are: achieving highest aesthetic quality; and functional building that fits its purpose. Findings: The study revealed that Directing is the major leadership style used by project managers in Nigeria. Amongst the leadership styles which has the most impact on quality performance indicators is also directing which has the most relative influence on achieving highest aesthetic quality and functional building that fits its purpose. Conclusion/Recommendation/Way forward: The underlying relationship between Directing leadership styles and the performance criteria of achieving highest aesthetic quality and functional building that fits its purpose will be beneficial to the Nigerian construction environment.

  9. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  10. Impact evaluation in multicultural educational projects : case: ADAPTYKES project

    OpenAIRE

    Kuusisto, Miika

    2014-01-01

    The objective of this thesis was to examine the common evaluation concepts of the European Union’s funded projects. Such concepts inter alia are effectiveness, impacts and sustainability. The aim was to study how these are realized in multicultural educational case–project in a context, where the project is funded by the European Commission’s Leonardo DaVinci Programme. Thesis introduces two evaluation approaches, which are Logical Framework Approach and Realistic evaluation model. The fi...

  11. Role of quality assurance vs project manager's responsibility for waste projects

    International Nuclear Information System (INIS)

    Solecki, J.

    1989-01-01

    This paper takes a project manager's perspective and discusses the role of the quality assurance organization in the development, implementation and interface related to the QA program for waste projects. The author describes the role which the QA program plays in allowing project management to assure that the project manager knows what is placed in the repository and the characteristics of the surrounding environment meet closure requirements

  12. Genotyping of virulent Escherichia coli obtained from poultry and poultry farm workers using enterobacterial repetitive intergenic consensus-polymerase chain reaction

    Directory of Open Access Journals (Sweden)

    M. Soma Sekhar

    2017-11-01

    Full Text Available Aim: The aim of this study was to characterize virulent Escherichia coli isolated from different poultry species and poultry farm workers using enterobacterial repetitive intergenic consensus-polymerase chain reaction (ERIC-PCR genotyping. Materials and Methods: Fecal swabs from different poultry species (n=150 and poultry farm workers (n=15 were analyzed for E. coli and screened for virulence genes (stx1, stx2, eaeA, and hlyA by multiplex PCR. Virulent E. coli was serotyped based on their "O" antigen and then genotyped using ERIC-PCR. Results: A total of 134 E. coli isolates (122/150 from poultry and 12/15 from farm workers were recovered. Virulence genes were detected in a total of 12 isolates. Serological typing of the 12 virulent E. coli revealed nine different serotypes (O2, O49, O60, O63, O83, O101, O120, UT, and Rough. ERIC-PCR genotyping allowed discrimination of 12 virulent E. coli isolates into 11 ERIC-PCR genotypes. The numerical index of discrimination was 0.999. Conclusion: Our findings provide information about the wide genetic diversity and discrimination of virulent E. coli in apparently healthy poultry and poultry farm workers of Andhra Pradesh (India based on their genotype.

  13. A complementary role of multiparameter flow cytometry and high-throughput sequencing for minimal residual disease detection in chronic lymphocytic leukemia: an European Research Initiative on CLL study.

    LENUS (Irish Health Repository)

    Rawstron, A C

    2016-04-01

    In chronic lymphocytic leukemia (CLL) the level of minimal residual disease (MRD) after therapy is an independent predictor of outcome. Given the increasing number of new agents being explored for CLL therapy, using MRD as a surrogate could greatly reduce the time necessary to assess their efficacy. In this European Research Initiative on CLL (ERIC) project we have identified and validated a flow-cytometric approach to reliably quantitate CLL cells to the level of 0.0010% (10(-5)). The assay comprises a core panel of six markers (i.e. CD19, CD20, CD5, CD43, CD79b and CD81) with a component specification independent of instrument and reagents, which can be locally re-validated using normal peripheral blood. This method is directly comparable to previous ERIC-designed assays and also provides a backbone for investigation of new markers. A parallel analysis of high-throughput sequencing using the ClonoSEQ assay showed good concordance with flow cytometry results at the 0.010% (10(-4)) level, the MRD threshold defined in the 2008 International Workshop on CLL guidelines, but it also provides good linearity to a detection limit of 1 in a million (10(-6)). The combination of both technologies would permit a highly sensitive approach to MRD detection while providing a reproducible and broadly accessible method to quantify residual disease and optimize treatment in CLL.

  14. BioProject

    Data.gov (United States)

    U.S. Department of Health & Human Services — The BioProject database provides an organizational framework to access information about research projects with links to data that have been or will be deposited...

  15. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  16. The Multiple Modernities of Europe

    DEFF Research Database (Denmark)

    Thomassen, Bjørn

    What Europe? Eric Voegelin on the Mediterranean and the Atlantic modernities. The concept ‘multiple modernities’ has during the last decade established itself in social and political theory, not least due to contributions made by Shmul Eisenstadt. The debate on multiple moderntities has served...... to question certain eurocentric assumptions about modernity and has also reignited the question of European particularity in a world historical perspective. This paper will discuss how ‘Europe’ itself can be considered a result of (at least) two different modernities, as proposed by the political theorist......, Eric Voegelin. Eric Voegelin talked of two spatio-temporal specific modernities, the Mediterranean and the Atlantic modernities. In short, for Voegelin the Atlantic modernity with its breakthroughs in the 17th and 18th centuries was a specific figuration that should not be mistaken for ‘modernity...

  17. Choice of large projects

    Energy Technology Data Exchange (ETDEWEB)

    Harris, R

    1978-08-01

    Conventional cost/benefit or project analysis has generally not taken into account circumstances in which the project under consideration is large enough that its introduction to the economy would have significant general equilibrium effects. In this paper, rules are examined that would indicate whether such large projects should be accepted or rejected. The rules utilize information yielded by before-project and after-project equilibrium prices and production data. Rules are developed for the undistorted ''first-best'' case, the case in which the fixed costs of the project are covered by distortionary taxation, and for the case of projects producing public goods. 34 references.

  18. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  19. Harvard Project Physics Newsletter 10. The Project Physics Course, Text.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    A short description of the availability of Harvard Project Physics course components is given as is a discussion of the growth of the use of Project Physics in schools, including some enrollment data and survey results. Locations of the 1970 and 1971 Summer Institutes are listed. Adaptations of Project Physics course outside the United States are…

  20. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  1. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  2. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  3. History of silviculture on public lands

    Science.gov (United States)

    James M. Guldin

    2014-01-01

    There are many instances in scholarly activity where the writing of a colleague is made more vivid when one knows him or her personally—and Eric Zenner’s essay is certainly no exception! I can see Eric at a podium of a forestry school in the United States or Europe, emphatically proclaiming that “Silviculture is the pen with which our profession writes, but too often...

  4. The Behavioral Physiology of Labroid Fishes.

    Science.gov (United States)

    1992-09-01

    Cassoti, John Salsig, Noellette (Sam) Conway, Hagan Schempf, Ken Gartner, Steve Bollens, Tom DiChristina and Eric Zettler are hereby thanked. I would...his wife Amy. Jake and Anna Maria Peirson deserve a special grazie for trying to keep me in line (with mixed success). I also thank Eric Fajer. Debbie...the reproductive period the females become active at night. In the cave-dwelling loach Oreonectus evezardi, a circadian rhythm as well as a

  5. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  6. A Qualitative Study of the Relationship between a Banking IT Troubled Project and the Executive Project Sponsor's Project Management Maturity Level

    Science.gov (United States)

    Northcraft, Terry G.

    2017-01-01

    This qualitative study examined the effect the level of project management maturity a banking IT project sponsor has on project success. Project management maturity is gauged by the amount of modern project management training, knowledge and organizational skills an individual or organization has and applies to their project lifecycle experiences.…

  7. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  8. Projects as value constellations

    DEFF Research Database (Denmark)

    Laursen, Markus

    Creating value has been outlined as very central to projects applying the organizational perspective to projects. It has been suggested that value is created in value constellations or project networks, where actors work together to create value. However, research on the value creation process...... in value constellations is scarce, and through an exploratory study of two project networks in a cultural setting we investigate how value is created in value constellations. We outline how each project may be a distinct type of value constellation, one project creates value for the partners of the network...... as a consortium, and the project creates value primarily for others as a facilitator....

  9. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two ...... important qualifications for the understanding of the contributions and results established in the project.......In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...

  10. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  11. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  12. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Science.gov (United States)

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  13. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  14. Project mobilisation

    International Nuclear Information System (INIS)

    Clark, J.; Limbrick, A.

    1996-01-01

    This paper identifies and reviews the issues to be addressed and the procedures to be followed during the mobilisation of projects using LFG as an energy source. Knowledge of the procedures involved in project mobilisation, their sequence and probable timescales, is essential for efficient project management. It is assumed that the majority of projects will be situated on existing, licensed landfill sites and, in addition to complying with the relevant conditions of the waste management licence and original planning consent, any proposed developments on the site will require a separate planning consent. Experience in the UK indicates that obtaining planning permission rarely constitutes a barrier to the development of schemes for the utilisation of LFG. Even so, an appreciation of the applicable environmental and planning legislation is essential as this will enable the developer to recognise the main concerns of the relevant planning authority at an early stage of the project, resulting in the preparation of an informed and well-structured application for planning permission. For a LFG utilisation scheme on an existing landfill site, the need to carry out an environmental assessment (EA) as part of the application for planning permission will, in vitually all cases, be discretionary. Even if not deemed necessary by the planning authority, an EA is a useful tool at the planning application stage, to identify and address potential problems and to support discussions with bodies such as the Environment Agency, from whom consents or authorisations may be required. Carrying out an EA can thus provide for more cost-effective project development and enhanced environmental protection. Typically, the principal contractual arrangements, such as the purchase of gas or the sale of electricity, will have been established before the project mobilisation phase. However, there are many other contractural arrangements that must be established, and consents and permits that may be

  15. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  16. Building Project Competence

    DEFF Research Database (Denmark)

    Pemsel, Sofia; Wiewiora, Anna

    This research investigates the development of project competence, and particularly, three related dynamic capabilities (shifting, adapting, leveraging) that contribute to project competence development. In doing so, we make use of the emerging literature on knowledge governance and theorize how...... of dynamic capability building promoting project competence development....

  17. Organizations, projects and culture

    NARCIS (Netherlands)

    J. van Cleeff; Pieter van Nispen tot Pannerden

    2016-01-01

    Purpose: to explore and demonstrate the effects of organizational culture on projects, in particular project culture and project management style. Methodology/approach: descriptive and explorative; through students’ groups. Findings: the cultural relationship between organizations, their projects

  18. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    Science.gov (United States)

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  19. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  20. Knowledge Management in a Project Environment: Organisational CT and Project Influences

    OpenAIRE

    Polyaninova, Taya

    2011-01-01

    During a project implementation various forms of information and experience are generated within the organization. If this accumulated knowledge is not recorded and shared amongst other projects, this knowledge will be lost and no longer be available to assist future projects. This may lead to increased future projects costs as resources, time and money will be wasted on redefining the knowledge that once existed within the company. By not capturing and redeploying this knowledge, the quality...

  1. Eric P. Knoshaug | NREL

    Science.gov (United States)

    @nrel.gov | 303-384-7779 Orcid ID http://orcid.org/0000-0002-5709-914X Research Interests Microbiology utilization in yeast Algal growth systems Enhancing algal biomass and lipid production Nitrogen stress substrates, and increasing biomass and lipid production in microalgae. Education M.S., Microbiology, Oregon

  2. Play Therapy. ERIC Digest.

    Science.gov (United States)

    Landreth, Garry; Bratton, Sue

    Play therapy is based on developmental principles and, thus, provides, through play, developmentally appropriate means of expression and communication for children. Therefore, skill in using play therapy is an essential tool for mental health professionals who work with children. Therapeutic play allows children the opportunity to express…

  3. College Rankings. ERIC Digest.

    Science.gov (United States)

    Holub, Tamara

    The popularity of college ranking surveys published by "U.S. News and World Report" and other magazines is indisputable, but the methodologies used to measure the quality of higher education institutions have come under fire by scholars and college officials. Criticisms have focused on methodological flaws, such as failure to consider…

  4. Using Project Complexity Determinations to Establish Required Levels of Project Rigor

    Energy Technology Data Exchange (ETDEWEB)

    Andrews, Thomas D.

    2015-10-01

    This presentation discusses the project complexity determination process that was developed by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office for implementation at the Nevada National Security Site (NNSS). The complexity determination process was developed to address the diversity of NNSS project types, size, and complexity; to fill the need for one procedure but with provision for tailoring the level of rigor to the project type, size, and complexity; and to provide consistent, repeatable, effective application of project management processes across the enterprise; and to achieve higher levels of efficiency in project delivery. These needs are illustrated by the wide diversity of NNSS projects: Defense Experimentation, Global Security, weapons tests, military training areas, sensor development and testing, training in realistic environments, intelligence community support, sensor development, environmental restoration/waste management, and disposal of radioactive waste, among others.

  5. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    is very positive and that the structure, strict enforcement and rolling project management responsibility in a group work setting really helps them drive the project forward with high motivation. The main challenge lies in the balance between loading the teams with too many challenges and just providing......The Curriculums and programs in Problem Based Learning (PBL) utilizes the project-format in a team based setting for rehearsing the competencies of applying the design-oriented skills and knowledge learned in courses and workshops. If the project period is self-organised, there is a tendency......, because of the facilitated format where ‘disturbances’ are eliminated. If successful the state of creative flow is achieved. So how can we create a sense of urgency in longer project periods, not just workshop format, that would help a team of design students to engage and drive the project from the start...

  6. Projection Models 2010

    DEFF Research Database (Denmark)

    Illerup, J. B.; Birr-Pedersen, K.; Mikkelsen, M. H

    Models for projection of SO2-, NOx-, NMVOC- and NH3-emissions to the atmosphere have been developed and the Danish emissions have been projected until 2010 from a basis scenario including all implemented and planned measures. The projections of the four pollutants indicate that it may be difficult...

  7. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  8. Changing project finance climate; Project finance wo meguru kankyo henka

    Energy Technology Data Exchange (ETDEWEB)

    Madono, S. [The Export-Import Bank of Japan, Tokyo (Japan)

    1998-03-01

    Development of conditions under which project financing (PF) functions is described. PF, a method with which funds are procured for a project on the security of the assets of and the cash flow involving the project, established its position as a popular financial means. Into the 1990, however, PF underwent a complete change, when it came to be actively employed as a means for the procurement of money for what is called `infrastructure building project for invigorating the private sector` in the developing countries. PF has now come to be utilized for the financing of projects in various fields besides the field of resources exploitation. In particular, PF is now utilized in schemes such as BOT (build, operate, transfer) in public enterprises, for instance, electric power utilities in developing countries. The gravest problem found in the private sector invigorating type PF is that the sponsor, operator, exporter, and lender on their respective levels are experiencing rising risks because of intensified competition in the presence of a great number of projects. Such risks involve the exchange rate, the completion of work, and the relations between the borrower and operator. 2 figs.

  9. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  10. Project plan remove special nuclear material from PFP project plutonium finishing plant

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  11. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    International Nuclear Information System (INIS)

    Shank, D.R.

    1994-01-01

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium

  12. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    Energy Technology Data Exchange (ETDEWEB)

    Shank, D.R.

    1994-12-29

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium.

  13. Implementation Strategies for Gender-Sensitive Public Health Practice: A European Workshop.

    Science.gov (United States)

    Oertelt-Prigione, Sabine; Dalibert, Lucie; Verdonk, Petra; Stutz, Elisabeth Zemp; Klinge, Ineke

    2017-11-01

    Providing a robust scientific background for the focus on gender-sensitive public health and a systematic approach to its implementation. Within the FP7-EUGenMed project ( http://eugenmed.eu ) a workshop on sex and gender in public health was convened on February 2-3, 2015. The experts participated in moderated discussion rounds to (1) assemble available knowledge and (2) identify structural influences on practice implementation. The findings were summarized and analyzed in iterative rounds to define overarching strategies and principles. The participants discussed the rationale for implementing gender-sensitive public health and identified priorities and key stakeholders to engage in the process. Communication strategies and specific promotion strategies with distinct stakeholders were defined. A comprehensive list of gender-sensitive practices was established using the recently published taxonomy of the Expert Recommendations for Implementing Change (ERIC) project as a blueprint. A clearly defined implementation strategy should be mandated for all new projects in the field of gender-sensitive public health. Our tool can support researchers and practitioners with the analysis of current and past research as well as with the planning of new projects.

  14. Projection: A Bibliography.

    Science.gov (United States)

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  15. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  16. Teaching supply chain management through global projects with global project teams

    NARCIS (Netherlands)

    Kopczak, L.R.; Fransoo, J.C.

    2000-01-01

    In this article, we describe the Global Project Coordination Course, a course in which project teams composed of three students from each of two overseas universities execute company-sponsored projects dealing with global supply chain management issues. The $75,000 to $100,00 contributed in total by

  17. OMEGA project

    International Nuclear Information System (INIS)

    Shibuya, E.H.

    1989-01-01

    The OMEGA - Observation of Multiple particle production, Exotic Interactions and Gamma-ray Air Shower-project is presented. The project try to associate photosensitive detectors from experiences of hadronic interactions with electronic detectors used by experiences that investigate extensive atmospheric showers. (M.C.K.)

  18. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  19. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  20. Momentum projection and relativistic boost of solitons: Coherent states and projection

    International Nuclear Information System (INIS)

    Luebeck, E.G.; Birse, M.C.; Henley, E.M.; Wilets, L.

    1986-01-01

    We present a method for calculating center-of-mass corrections to hadron properties in soliton models and we apply the method to the soliton bag model. A coherent state is used to provide a quantum wave function corresponding to the mean-field approximation. This state is projected onto a zero-momentum eigenstate. States of nonzero momentum can be constructed from this with a Lorentz boost operator. Hence center-of-mass corrections can be made in a properly relativistic way. The energy of the projected zero-momentum state is the hadron mass with spurious center-of-mass energy removed. We apply a variational principle to our projected state and use three ''virial theorems'' to test our approximate solution. We also study projection of general one-mode states. Projection reduces the nucleon energy by up to 25%. Variation after projection gives a further reduction of less than 20%. Somewhat larger reductions in the energy are found for meson states

  1. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  2. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  3. Your Project Management Coach Best Practices for Managing Projects in the Real World

    CERN Document Server

    Biafore, Bonnie

    2012-01-01

    A pragmatic approach to project management Many projects fail to deliver on time or on budget, or even to deliver a workable product that satisfies the customer. While good project management goes a long way towards ensuring success, managers often fail to follow the plans they implement. This unique guide helps you understand and successfully handle project management, once and for all. Covering practical ways to solve problems you'll typically face when managing actual projects, this pragmatic book takes you through a full project management lifecycle. You'll find ample tips, tricks, and bes

  4. Strategy as Projects

    DEFF Research Database (Denmark)

    Lund Pedersen, Carsten; Ritter, Thomas; Andersen, Torben Juul

    This paper proposes the adoption of a project-based view to analyze strategy formation and strategic renewal over time. Projects are resource-committing, empirically-tracable investments, and as such, particularly suitable for the analysis of different manifestations of intended strategies as well...... as post-hoc manifestations of deviant, even rebellious, actions taken in opposition to the initial strategy announcement. The paper presents an analytical framework (a 5x2 matrix) of ten different project categories that together allows researchers to investigate how strategic renewal is realized through...... the enactment of different types of project initiatives throughout the organization. The developed framework is validated by two field studies that outline the robustness of the proposed matrix. In addition to the demonstration of the advantages of the framework, we discuss the limitations of the strategy-as-projects...

  5. Project quality assurance plant: Sodium storage facility, project F-031

    International Nuclear Information System (INIS)

    Shultz, J.W.; Shank, D.R.

    1994-11-01

    The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009

  6. Bi-project management in engineering complex industrial construction projects

    NARCIS (Netherlands)

    Velde, Robert R. van der; Donk, Dirk Pieter van

    2000-01-01

    Engineering large industrial construction projects is usually a complex task with several co-operating actors. This paper investigates such projects, characterised by two main actors: the owner of the installation (the client organisation) responsible for the engineering of the production process,

  7. Beyond theory : Towards a probabilistic causation model to support project governance in infrastructure projects

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen; Voordijk, Johannes T.; Dewulf, Geert

    2017-01-01

    A new project governance model for infrastructure projects is described in this paper. This model contains causal mechanisms that relate a number of project governance variables to project performance. Our proposed model includes relevant variables for measuring project governance in construction

  8. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  9. The Impact of Project Organizational Culture on the Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    Luong Hai Nguyen

    2017-05-01

    Full Text Available Cultural influence has recently received significant attention from academics due to its vital role in the success or failure of a project. In the construction industry, several empirical investigations have examined the influence of culture on project management. The aim of this study is to determine the impact of project organizational culture on the performance of construction projects. A total of 199 completed construction projects in Vietnam with specific data gathering through questionnaires were analyzed. The findings reveal that contractor commitment to contract agreements is the most significant cultural factor affecting project performance. Goal alignment and reliance, contractor commitment, and worker orientation (i.e., commitment to workers contribute to improved overall performance and participant satisfaction. Contractor commitment and cooperative orientation enhance labor productivity, whereas goal alignment and trust and contractor commitment ensure learning performance (i.e., learning from experience. The findings of this study may assist construction professionals in implementing practices that can contribute to the sustainability and success of construction projects.

  10. Project of the Year Submittal SY-101 Surface Level Rise Remediation Project

    International Nuclear Information System (INIS)

    BAUER, R.E.

    2001-01-01

    CH2M HILL Hanford Group is pleased to nominate the SY-101 Surface Level Rise Remediation Project (SLRRP) for the Project Management Institute's consideration as International Project of the Year for 2001. We selected this project as being our best recent example of effective project management, having achieved and exceeded our client's expectations in resolving urgent safety issues related to the storage of high level nuclear waste. In reflection, we consider the SY-101 SLRRP to be a prime example of safe and effective project delivery. The pages that follow present the tools and techniques employed to manage this complex and technically challenging project. Our objective in submitting this nomination is twofold--to share the lessons we have learned with other organizations, and to honor the men and women who contributed to this endeavor. It was by their diligent effort that the successes we relate here were accomplished 10 months ahead of schedule and one million dollars below the authorized budget

  11. New Accelerator Projects

    International Nuclear Information System (INIS)

    Delahaye, J.P.

    2010-01-01

    There is large number of ambitious accelerator projects with promising performances in the near (and short term) future which aims at exploring energy and/or luminosity frontiers and Complementary aspects of various particles species. High Energy Physics requirements are extremely demanding with challenging parameters: entering into the new territories of the tera-scale data, high Energy or/and High (Integrated) Luminosity, high performance, high availability, long lifetime, luminosity leveling etc.. New projects are more and more challenging: larger, more powerful, more expensive, technology above present standard. Innovative ideas and breakthrough on novel technologies are key for HEP adventure. Aggressive R and D is imperative on beam and Technology related, on cost and power consumption mitigation.. There is ambitious Test Facilities to address feasibility. More and more time and (M and P) resources are required from first ideas to project proposal: it is of prime importance to launch R and D early, explore all possible options of schemes and technologies (anticipating future Physics requests), make realistic status and schedule estimates (preserve credibility and make reasonable plans). Global Collaboration is mandatory from the R and D phase to the construction and operation in order to make best use of limited resources and available expertise as inspired from successful collaborations on Detectors. The global strategy of new accelerator projects in truly world-wide collaboration aims at: - defining all various Projects and Technology options worth exploring, - taking advantage of global teams made of world-wide experts, and of synergies to address common issues (generic R and D) of various projects, - preparing together plethora of project proposals to cover Physics Landscape (ready for window opportunity), - developing Collaborative/Competition (Experts in Collaboration, Technology and Projects options in Competition), - Joining resources on (few) selected

  12. Freedom Project

    Directory of Open Access Journals (Sweden)

    Alejandra Suarez

    2014-02-01

    Full Text Available Freedom Project trains prisoners in nonviolent communication and meditation. Two complementary studies of its effects are reported in this article. The first study is correlational; we found decreased recidivism rates among prisoners trained by Freedom Project compared with recidivism rates in Washington state. The second study compared trained prisoners with a matched-pair control group and found improvement in self-reported anger, self-compassion, and certain forms of mindfulness among the trained group. Ratings of role-plays simulating difficult interactions show increased social skills among the group trained by Freedom Project than in the matched controls.

  13. Project Finance: Basic Components

    OpenAIRE

    Alfieri Li Ojeda, Jaime

    2015-01-01

    The natural speed of the contemporary world demands large investment projects which require specialized financial techniques such as Project Finance, defined as a fund to finance investment projects of great magnitude. Every Project Finance involves a wide range of elements such as promoters, government, contractors andsuppliers, among others, that will ensure project success. La rapidez del mundo contemporáneo exige que los grandes proyectos de inversión requieran de técnicas financieras ...

  14. Managing externally financed projects: the Integrated Primary Health Care Project in Bolivia.

    Science.gov (United States)

    Homedes, N

    2001-12-01

    Bolivia is one of the poorest countries in Latin America. Health indicators are very poor, communicable diseases are prevalent and, coupled with malnutrition, remain the major killers of children under 5 years old. The Integrated Primary Health Care Project (PROISS) was a US$39 million project executed by the Ministry of Health (MOH), 50% financed by the World Bank and aimed at improving primary health care in the four largest Bolivian municipalities. The implementation of the project started in 1990 and ended in 1997. During implementation it went through three distinct phases: Phase 1 (1990-94) was a period characterized by conflict and confusion; Phase 2 (1995-mid-1996) documented major improvements in coverage and service quality; and Phase 3 (mid-1996-97) witnessed the decline of the project. This paper explores the factors that contributed to the success and the decline of the project, draws lessons for project managers and international agencies involved in the definition and implementation of social sector projects, and discusses the unlikelihood that externally financed projects can have a sustainable impact on the development of the health sector of recipient countries.

  15. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  16. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  17. Clustering ERP implementation project activities: a foundation for project size definition

    NARCIS (Netherlands)

    Janssens, G.; Kusters, R.J.; Heemstra, F.J.; Sadiq, A.; Reichert, M.; Schultz, K.; Trienekens, J.J.M.; Moller, C.; Kusters, R.J.

    2007-01-01

    The size of an ERP project can be a useful measurement for predicting the effort needed to complete an ERP implementation project. Because this measurement does not exist, research is needed to find a set of variables which can define the size of an ERP implementation project. This paper shows 21

  18. The Mexican Education System, the Keystone to Combatting Crime and Improving Economic Well-Being

    Science.gov (United States)

    2011-10-28

    Hanushek and Wößmann that, “the cognitive skills of a population– rather than mere school attainment – are powerfully related to individual earnings...14, 2011. http://www.oecd.org/dataoecd/35/24/44696802.pdf. 36 Eric A Hanushek and Ludger Wößmann. "The Role of Education Quality in Economic...August 2007. Accessed October 13, 2011. http://www.loc.gov/law/help/child-rights/pdfs/childrensrights-mexico.pdf. Hanushek , Eric A., and Ludger

  19. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  20. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  1. Innovations in project activities

    Directory of Open Access Journals (Sweden)

    Serbskaya O.V.

    2016-11-01

    Full Text Available this article considers the ways of project management, models of project management: classical model and the model of flexible designing Agile, pays more attention to the process of project management using Agile model and to the problems of using the project management models in modern conditions.

  2. The Llama Project.

    Science.gov (United States)

    Ganzel, Candy; Stuglik, Jan

    2003-01-01

    At a suburban Indiana elementary school, the Project Approach serves as the basis of the curriculum in all Kindergarten classrooms. The four classes of 5- and 6-year-old children at this school chose to study llamas. This article discusses how the project evolved, describes the three phases of the project, and provides teachers' reflections on the…

  3. Power supply projects a collection of innovative and practical design projects

    CERN Document Server

    Maplin

    1996-01-01

    Using circuit diagrams, PCB layouts, parts lists and clear construction and installation details, this book provides everything someone with a basic knowledge of electronics needs to know in order to put that knowledge into practice.This latest collection of Maplin projects are a variety of power supply projects, the necessary components for which are readily available from the Maplin catalogue or any of their high street shops. Projects include, laboratory power supply projects for which there are a wide range of applications for the hobbyist, from servicing portable audio and video equipment

  4. Ultra advanced projects. ; Naming hyper-hightech projects. (Cho) no tsuku project. ; Naming no shikumi

    Energy Technology Data Exchange (ETDEWEB)

    Goto, Y. (Ministry of International Trade and Industry, Tokyo (Japan))

    1992-10-05

    Significance of using 'super' for naming a project of technological development is discussed. Functions of naming are classified into (1) recognition, (2) display and (3) sales-promotion, whereby mechanism of naming of merchandise that is developed through the technique of 3 is considered. Further, the mechanism of naming is discussed in relation to marketing. It is pointed out that naming of merchandise is determined on the basis of (1) concept of planned goods and (2) marketing-mixes composed of goods, price, sales-roots and sales-promotion. The same mechanism works also in a project for technological development. Technical trends are caught and projects are targetted by taking supposed regimes into account, thereby the most suitable mix is formed. The mix in the technological development is assumed to be composed of purpose, specification, regime and sales-promotion. Two examples of the governmental projects by Ministry of International Trade and Industry, 'the big regime for research and development on industrial technologies' and 'the regime for development of the fundamental technologies in the next generation' are introduced and the significance of their naming is described. 2 tabs.

  5. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.

  6. The HGF strategy project

    International Nuclear Information System (INIS)

    Knebel, J.U.; Fellmoser, F.; Lefhalm, C.; Mack, K.; Pettan, C.; Piecha, H.; Konys, J.; Adelhelm, C.; Glasbrenner, H.; Muscher, H.; Novotny, J.; Voss, Z.; Wedemeyer, O.; Mueller, G.; Heinzel, A.; Schumacher, G.; Huber, R.; Zimmermann, F.; Groetzbach, G.; Dorr, B.; Carteciano, L.N.

    2000-01-01

    Within the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren (HGF) an HGF-Strategy Fund Project entitled 'Innovative Technologies to Reduce Radiotoxicity' is funded since October 1999. The objectives of this HGF-Strategy Fund Project is the development of new methods and technologies to design and manufacture thin-walled and highly thermally-loaded surfaces which are cooled by a corrosive heavy liquid metal (lead-bismuth eutectic). The result of this project will be the basic scientific-technical tool which allows the conception and the design of a European Demonstrator of an ADS system (cf. 32.23.05). The work performed at Forschungszentrum Karlsruhe is embedded in a broad European research and development programme on ADS systems. The project is divided in three sub-projects: Sub-Project 1: Thermalhydraulic Investigations, Sub-Project 2: Material Specific Investigations, Sub-Project 3: Oxygen Control System. This progress report gives a general description of the project and its envisaged objectives. As a selection of the results achieved, first, FLUTAN calculations for the COULI beam window design and, second, the oxygen control system for the KArlsruhe Lead LAboratory KALLA are described in detail. Finally, the design and status of KALLA is given. (orig.)

  7. IT Project Management Metrics

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  8. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...... to be very precises and with success used on the second test group. Distributed project work is coming pretty soon and with little improvement in server tools, projects in different topics with a large and inhomogeneous profile of users are realistic.......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...

  9. Bioenergy/Biotechnology projects

    Energy Technology Data Exchange (ETDEWEB)

    Napper, Stan [Louisiana Tech Univ., Ruston, LA (United States); Palmer, James [Louisiana Tech Univ., Ruston, LA (United States); Wilson, Chester [Louisiana Tech Univ., Ruston, LA (United States); Guilbeau, Eric [Louisiana Tech Univ., Ruston, LA (United States); Allouche, Erez [Louisiana Tech Univ., Ruston, LA (United States)

    2012-06-30

    This report describes the progress of five different projects. The first is an enzyme immobilization study of cellulase to reduce costs of the cellulosic ethanol process. High reusability and use of substrates applicable to large scale production were focus areas for this study. The second project was the development of nanostructured catalysts for conversion of syngas to diesel. Cobalt nanowire catalyst was used in Fischer-Tropsch synthesis. The third project describes work on developing a microfluidic calorimeter to measure reaction rates of enzymes. The fourth project uses inorganic polymer binders that have the advantage of a lower carbon footprint than Portland cement while also providing excellent performance in elevated temperature, high corrosion resistance, high compressive and tensile strengths, and rapid strength gains. The fifth project investigates the potential of turbines in drop structures (such as sewer lines in tall buildings) to recover energy.

  10. Statistical Techniques for Project Control

    CERN Document Server

    Badiru, Adedeji B

    2012-01-01

    A project can be simple or complex. In each case, proven project management processes must be followed. In all cases of project management implementation, control must be exercised in order to assure that project objectives are achieved. Statistical Techniques for Project Control seamlessly integrates qualitative and quantitative tools and techniques for project control. It fills the void that exists in the application of statistical techniques to project control. The book begins by defining the fundamentals of project management then explores how to temper quantitative analysis with qualitati

  11. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  12. Four Approaches to Project Evaluation

    DEFF Research Database (Denmark)

    Laursen, Markus; Svejvig, Per; Rode, Anna Le Gerstrøm

    . Each of the framework’s four approaches provides a distinct evaluation that sheds light on some issues while leaving others unattended. Following these lines, the paper calls for more multi-faceted project evaluations. Introducing a framework that can help analyze existing evaluations and structure......There are many theoretical and practical reasons for evaluating projects – including explorative arguments focusing on expanding descriptive knowledge on project work as well as normative arguments focusing on improving prescriptive models of project performance. Despite the need for project...... management methodologies that work and combat project failure, and research methods that can assess effective project management and methodologies, as well as empirical research on the actuality of projects as practice, evaluation research on projects including project management and methodologies is scarce...

  13. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  14. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    International Nuclear Information System (INIS)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J.; Ventae, O.; Valkonen, J.; Holmberg, J.E.

    2006-04-01

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  15. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J. [IFE (Norway); Ventae, O.; Valkonen, J.; Holmberg, J.E. [VTT Technical Research Centre of Finland (Finland)

    2006-04-15

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  16. Flat-plate solar array project. Volume 8: Project analysis and integration

    Science.gov (United States)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  17. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  18. MRS project management

    International Nuclear Information System (INIS)

    Doman, J.W.; Vlahakis, J.

    1992-01-01

    Management of projects under the control of the Office of Civilian Radioactive Waste Management within the Department of Energy is subject to overview by a variety of internal and external entities. This paper reports that effective project management often requires balancing of conflicting directions and conflicting agendas of the different entities in order to proceed with implementation of the Monitored Retrievable Storage project

  19. The Canada Goose Project: A First Project with Children under 3

    Science.gov (United States)

    Brewer, Ruth A.

    2010-01-01

    This project report describes how five children (an infant, three toddlers, and a preschooler) enrolled at a private day care home engaged in their first journey into project work through a study of Canada geese living on a nearby body of water. Prior to the experience described in this paper, the author had used the Project Approach only with…

  20. Project-based fieldwork: perspectives of graduate entry students and project sponsors.

    Science.gov (United States)

    Fortune, Tracy; McKinstry, Carol

    2012-08-01

    This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  1. The virtual GULLIVER project

    NARCIS (Netherlands)

    Trappl, R.; Nijholt, Antinus; Stuk, M.; Zwiers, Jakob

    2002-01-01

    In this paper we discuss our virtual reality project Gulliver. This project is part of a more comprehensive project conceived by two artists, Matjaž Štuk and Alena Hudcovicová, called “Gulliver’s Museum of Living Art��?. Our part of the project involves a virtual reality version of Swift’s Gulliver

  2. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  3. Interactions of the NAEG information support project with other projects

    International Nuclear Information System (INIS)

    Pfuderer, H.A.

    1976-01-01

    In the past year the Information Support Project to the Nevada Applied Ecology Group has interacted with many other research projects on the transuranics and other radionuclides. Group interactions through symposiums, workshops, and responding to search requests have proven to be mutually beneficial. The NAEG Information Support Project will draw on the information resources of the Oak Ridge National Laboratory to produce a bibliography of the radionuclides (other than the transuranics) of interest to the Nevada Test Site

  4. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  5. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Duncan, David

    2011-01-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  6. The Human Genome Diversity Project

    Energy Technology Data Exchange (ETDEWEB)

    Cavalli-Sforza, L. [Stanford Univ., CA (United States)

    1994-12-31

    The Human Genome Diversity Project (HGD Project) is an international anthropology project that seeks to study the genetic richness of the entire human species. This kind of genetic information can add a unique thread to the tapestry knowledge of humanity. Culture, environment, history, and other factors are often more important, but humanity`s genetic heritage, when analyzed with recent technology, brings another type of evidence for understanding species` past and present. The Project will deepen the understanding of this genetic richness and show both humanity`s diversity and its deep and underlying unity. The HGD Project is still largely in its planning stages, seeking the best ways to reach its goals. The continuing discussions of the Project, throughout the world, should improve the plans for the Project and their implementation. The Project is as global as humanity itself; its implementation will require the kinds of partnerships among different nations and cultures that make the involvement of UNESCO and other international organizations particularly appropriate. The author will briefly discuss the Project`s history, describe the Project, set out the core principles of the Project, and demonstrate how the Project will help combat the scourge of racism.

  7. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-03-01

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  8. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. [Institutt for energiteknikk (IFE) (Norway); Valkonen, J. [Technical Research Centre of Finland (VTT) (Finland)

    2008-03-15

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  9. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    Science.gov (United States)

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  10. The 100 People Project

    Science.gov (United States)

    McLeod, Keri

    2007-01-01

    This article describes the 100 People Project and how the author integrates the project in her class. The 100 People Project is a nonprofit organization based in New York City. The organization poses the question: If there were only 100 people in the world, what would the world look like? Through the project, students were taught about ethics in…

  11. PROJECT MANAGEMENT AND RELATIONSHIP MARKETING: INTERSECTIONS FOR STAKEHOLDER MANAGEMENT IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Ronielton Rezende Oliveira

    2017-06-01

    Full Text Available Projects development is essential for organizations. Among the factors originated in projects that influence performance is quality. This variable must be managed to meet the expectations of the stakeholders and this can only be achieved through effective monitoring and control. It can be seen that relationship marketing is relevant to the competitive reality of contemporary organizations. With the purpose of contributing to organizational studies, this theoretical essay proposes to approach project management in relationship marketing. In the context of integrated management, it is discussed how management action can be applied to engage and involve stakeholders in projects, in order to create value and achieve the expectations sustained by the execution of the projects. Based on the reflection, the quality of relationship management is pointed out as a construct of higher order, composed of at least two dimensions: trust and satisfaction.

  12. How Agile Methods Conquers General Project Management - The Project Half Double Initiative

    DEFF Research Database (Denmark)

    Tordrup Heeager, Lise; Svejvig, Per; Schlichter, Bjarne Rerup

    2016-01-01

    Increased complexity in projects has forced new project management initiatives. In software development several agile methods have emerged and methods such as Scrum are today highly implemented in practice. General project management practice has been inspired by agile software development...

  13. Building thematic and integrated services for solid Earth sciences: the EPOS integrated approach

    Science.gov (United States)

    Cocco, Massimo; Consortium, Epos

    2016-04-01

    EPOS has been designed with the vision of creating a pan-European infrastructure for solid Earth science to support a safe and sustainable society. In accordance with this scientific vision, the EPOS mission is to integrate the diverse and advanced European Research Infrastructures for solid Earth science relying on new e-science opportunities to monitor and unravel the dynamic and complex Earth System. EPOS will enable innovative multidisciplinary research for a better understanding of the Earth's physical and chemical processes that control earthquakes, volcanic eruptions, ground instability and tsunami as well as the processes driving tectonics and Earth's surface dynamics. To accomplish its mission, EPOS is engaging different stakeholders, not limited to scientists, to allow the Earth sciences to open new horizons in our understanding of the planet. EPOS also aims at contributing to prepare society for geo-hazards and to responsibly manage the exploitation of geo-resources. Through integration of data, models and facilities, EPOS will allow the Earth science community to make a step change in developing new concepts and tools for key answers to scientific and socio-economic questions concerning geo-hazards and geo-resources as well as Earth sciences applications to the environment and human welfare. A long-term integration plan is necessary to accomplish the EPOS mission. EPOS is presently in its implementation phase further extending its pan-European dimension. The EPOS Implementation Phase builds on the achievements of the successful EPOS Preparatory Phase project and consists of two key activities: the legal establishment of the EPOS-ERIC and the EPOS IP project. The EPOS implementation phase will last from 2015 to 2019. Key objectives of the project are: implementing Thematic Core Services (TCS), the domain-specific service hubs for coordinating and harmonizing national resources/plans with the European dimension of EPOS; building the Integrated Core

  14. Innovative Project Activities in Science [From the NSTA Study of Innovative Project Activities

    Science.gov (United States)

    Science Teacher, 1975

    1975-01-01

    Describes four projects chosen as innovative project activities in science which exhibited identification of unique or novel problems and creative approaches to their solutions. Projects included a study of fish in Lake Erie, a goat raising project, an analysis of terrestrial plant ecology and soil composition, and a study of marine and wetlands…

  15. LEX Project

    DEFF Research Database (Denmark)

    Damkilde, Lars; Larsen, Torben J.; Walbjørn, Jacob

    This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept.......This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept....

  16. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  17. Project studies and engaged scholarship

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2016-01-01

    and to rejuvenate these research directions. Design/methodology/approach The authors propose the umbrella term: “project studies” to denote the research related to projects and temporary organizing. Project studies is conceived not only as a body of research, but also as a social process embedded in research...... scholars, who’s “job” goes beyond the writing of articles and research applications, and includes shaping discourses of project research, nurturing new project scholars, contributing to project practice and carefully considering the legacy of projects and project studies in society. Originality......Purpose In 2006, the “Rethinking Project Management” network called for a paradigm shift in project research, and proposed five research directions. The directions inspired research and marked a milestone in the development of the field. The purpose of this paper is to reflect on the past decade...

  18. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...... important qualifications for the understanding of the contributions and results established in the project....

  19. The New Mexico Technology Deployment Pilot Project: A technology reinvestment project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The New Mexico Technology Deployment Project (NMTDP) has been in operation for slightly more than two years. As one of the original TRP projects, NMTDP had the charter to develop and validate a new model for technology extraction which emphasized focused technology collaboration, early industry involvement, and a strong dual use commercialization and productization emphasis. Taken in total, the first two years of the NMTDP have been exceptionally successful, surpassing the goals of the project. This report describes the accomplishments and evolution of the NMTDP to date and discusses the future potential of the project. Despite the end of federal funding, and a subsequent reduction in level of effort, the project partners are committed to continuation of the project.

  20. Project plan remove special nuclear material from PFP project plutonium finishing plant; TOPICAL

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617,Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  1. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  2. Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-04-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project will further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities, that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  3. We Scrum Every Day: Using Scrum Project Management Framework for Group Projects

    Science.gov (United States)

    Pope-Ruark, Rebecca

    2012-01-01

    Collaborative group projects have documented learning benefits, yet collaboration is challenging for students because the educational system values individual achievement. This article explores Scrum, an approach to framing, planning, and managing group projects used in Web-software development. Designed for multi-faceted projects, this approach…

  4. Why does project planning fail

    International Nuclear Information System (INIS)

    Foley, M.; Luciano, G.

    1991-01-01

    The technology of project controls have become increasingly sophisticated. Some say that the technological advancements of the Nineteen-Eighties represented a maturation of project control tools. Others say that the advancements were merely bells and whistles that added little or nothing to the project management process. Above it all, as we enter the Nineties, there is a popular outcry to get back to the basics of planning. The genesis of this outcry is the sobering impact of significant cost overruns and schedule extensions, even on projects that have employed the most advanced project control tools and systems. This paper examines the merits of taking a strategic approach to the project planning process. Within that context, there are basic goals of planning which are enduring through the life cycle of the project. Key reasons for failure and inability to achieve the goals of project planning are explained. By examining the goals of project planning and the reasons for failure, insight is provided into the role of project controls specialists and sophisticated project control tools in meeting the challenges of complex project management in the 1990's

  5. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  6. Project management for profit a failsafe guide to keeping projects on track and on budget

    CERN Document Server

    Knight, Joe; Angus, Brad; Case, John

    2012-01-01

    If your work involves projects, then this book is for you. It will show every company owner and project manager—at businesses large and small—how to run projects differently. You’ll benefit if you’ve ever: • been over budget on a project • exceeded a timeline on a project • worked on a project that completely stalled as you neared the finish line • lost money on a sure-thing project and had no idea why • noticed that scope and feature creep held you back • watched a project take three times as long as planned • felt too embarrassed to perform a review of your successes and failures • wondered whether your project actually made any money By the time you finish the book, you’ll be ready to implement Project Management for Profit in your own company—and be prepared to keep your projects on track and on budget.

  7. Relationships and project marketing success

    DEFF Research Database (Denmark)

    Skaates, Maria Anne; Tikkanen, Henrikki; Lindblom, Jarno

    2002-01-01

    Project operations are a dominating mode of international business. Managing relationships and networks is crucial to project marketing success both at the level of the individual project and at the level of multiple projects. This article first defines key characteristics of project business, id...

  8. PROJECT FINANCE AS A TOOL FOR THE IMPLEMENTATION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    U. V. Vsyakih

    2015-02-01

    Full Text Available The article discusses the reasons for the insufficient use of project financing in the Russian Federation, the brief historical background for the project financing in Russia, as well as the main principles, types and stages of project financing. For results was used theoretical methods associated with the study of general and specialized literature, as well as methods of analysis and synthesis.

  9. An Exploratory Study of the Effects of Project Finance on Project Risk Management : How the Distinguishing Attributes of Project Finance affects the Prevailing Risk Factor?

    OpenAIRE

    Chan, Ka Fai

    2011-01-01

    Project finance is a financing arrangement for projects, and it is characterised by the creation of a legally independent project company financed with non- or limited recourse loans. It is observed that the popularity of project finance is increasing in the recent decades, despite of the impact of Asian financial crisis. Especially in emerging markets, project finance is very common among the public-private partnership projects. It is possible that project finance yields some benefits in pro...

  10. Project Management in Real Time: A Service-Learning Project

    Science.gov (United States)

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  11. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  12. Visualizations as Projection Devices

    DEFF Research Database (Denmark)

    Harty, Chris; Holm Jacobsen, Peter; Tryggestad, Kjell

    The aim of this paper is to inquire into the role of project visualizations in shaping healthcare spaces and practices. The study draws upon an ethnographic field study from a large on-going hospital construction project in Denmark, and focuses on the early phases of on-boarding the design team...... into the project organization. During the on-boarding visualizations multiplies in form, content and purpose, ranging from paper and digitally based projections of clinical work spaces and practices for the future hospital building in use, to paper and digitally based projections of the cost budget and time...

  13. Agile Project Management For Dummies

    CERN Document Server

    Layton, Mark C

    2012-01-01

    Be flexible and faster with Agile project management As mobile and web technologies continue to evolve rapidly, there is added pressure to develop and implement software projects in weeks instead of months. Agile Project Management For Dummies can make that happen. This is the first book to provide a simple, step-by-step guide to Agile Project Management approaches, tools, and techniques. With the fast pace of mobile and web technology development, software project development must keep pace; Agile Project Management enables developers to complete and implement projects more quickly and this b

  14. Three domains of project organising

    OpenAIRE

    Winch, Graham M.

    2014-01-01

    It has become axiomatic in research on project organising that projects are temporary organisations. Yet there are a number of challenges to this axiom: research on matrix organisation, the embeddedness of projects in project ecologies, and projectification all emphasise the relationship of the project to permanent organisations. Similarly, research on project-based firms and owner organisations which are relatively permanent challenges this axiom. This paper develops a conceptual framework w...

  15. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  16. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  17. Multi-Role Project (MRP): A New Project-Based Learning Method for STEM

    Science.gov (United States)

    Warin, Bruno; Talbi, Omar; Kolski, Christophe; Hoogstoel, Frédéric

    2016-01-01

    This paper presents the "Multi-Role Project" method (MRP), a broadly applicable project-based learning method, and describes its implementation and evaluation in the context of a Science, Technology, Engineering, and Mathematics (STEM) course. The MRP method is designed around a meta-principle that considers the project learning activity…

  18. Efficient and Effective Project Management

    Directory of Open Access Journals (Sweden)

    Dusan Pene

    2014-03-01

    Full Text Available The purpose of the article is to investigate different authorities and responsibilities of a project manager and of a project leader. Considering the fact that nowadays the project management is becoming the important factor in performing and leading the investments which are modified by modern leadership theories, we can say that the key element is the sovereign leadership of a manager and a project leader. The current multi-project environments and modern techniques at the project management area need the interdisciplinary leadership approach and at the same time they enable the strengthening of company’s competitive features so they are consistently satisfying high project expectations of the project investor or a client.

  19. The Dwarf Project: Vidojevica

    Science.gov (United States)

    Vince, O.

    2013-05-01

    The DWARF project is an important international project for observing eclipsing binary stars and searching for third companion which orbit around both stars. Recently, a group of researchers at the Astronomical Observatory of Belgrade joined this project using the 60 cm telescope at the Astronomical Station Vidojevica for observations. All the equipment and the human potential involved with this project from Serbia will be described in this paper.

  20. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  1. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    Science.gov (United States)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  2. Comprehensive assessment of the status scientific and technical projects using Technology Project Readiness Level

    Directory of Open Access Journals (Sweden)

    A. N. Petrov

    2016-01-01

    Full Text Available The balanced methodology for assessing the Technology Project Readiness Level for commercialization (TPRL is proposed. TPRL allows to determine the dynamics and balance of development projects that use the standardized approaches used in assessing the readiness of the technology. Validation of the methodology undertaken for the projects of Federal target programs “Research and development on priority directions of development of scientific-technological complex of Russia for 2007–2013” and “Research and development on priority directions of development of scientific-technological complex of Russia for 2014–2020”. The obtained results showed the possibility of application of the methodology for the evaluation of projects, improving efficiency of expert activity in the evaluation of projects, monitoring the status of individual project and group of projects (portfolio. The application of the methodology allowed us to improve the management of individual project and portfolio of projects.Methodology TPRL will allow the implementers, industry partners, investors, and innovative industrial companies to improve the efficiency of its activities.

  3. Project-Management Tools for Libraries: A Planning and Implementation Model Using Microsoft Project 2000

    OpenAIRE

    Ying Zhang; Corinne Bishop

    2005-01-01

    This paper discusses how Microsoft Project 2000 was utilized at the University of Central Florida Libraries to manage an e-reference implementation project. As libraries today adopt more information technologies, efficiently managing projects can be challenging. The authors’ experience in the implementation of QuestionPoint e-reference software in October 2003 is described. Their conclusion illustrates that project-management tools, such as Microsoft Project 2000, offer practical workflow-man...

  4. The Impact of Project Manager on Project Success – The Case of ICT Sector

    OpenAIRE

    Blaskovics, Bálint

    2016-01-01

    The project management literature on project success is rich. Numerous papers focus on the evolution of the understanding of project success, identification of success criteria and critical success factors. Critical success factors increase the potential for achieving project success, while project success can be evaluated with the help of success criteria. Although the interrelationships between critical success factors and success criteria are rarely analyzed, yet there is a strong demand f...

  5. Projective relativity, cosmology and gravitation

    International Nuclear Information System (INIS)

    Arcidiacono, G.

    1986-01-01

    This book describes the latest applications of projective geometry to cosmology and gravitation. The contents of the book are; the Poincare group and Special Relativity, the thermodynamics and electromagnetism, general relativity, gravitation and cosmology, group theory and models of universe, the special projective relativity, the Fantappie group and Big-Bang cosmology, a new cosmological projective mechanics, the plasma physics and cosmology, the projective magnetohydrodynamics field, projective relativity and waves propagation, the generalizations of the gravitational field, the general projective relativity, the projective gravitational field, the De Sitter Universe and quantum physics, the conformal relativity and Newton gravitation

  6. Improving Project Manufacturing Coordination

    Directory of Open Access Journals (Sweden)

    Korpivaara Ville

    2014-09-01

    Full Text Available The objective of this research is to develop firms’ project manufacturing coordination. The development will be made by centralizing the manufacturing information flows in one system. To be able to centralize information, a deep user need assessment is required. After user needs have been identified, the existing system will be developed to match these needs. The theoretical background is achieved through exploring the literature of project manufacturing, development project success factors and different frameworks and tools for development project execution. The focus of this research is rather in customer need assessment than in system’s technical expertise. To ensure the deep understanding of customer needs this study is executed by action research method. As a result of this research the information system for project manufacturing coordination was developed to respond revealed needs of the stakeholders. The new system improves the quality of the manufacturing information, eliminates waste in manufacturing coordination processes and offers a better visibility to the project manufacturing. Hence it provides a solid base for the further development of project manufacturing.

  7. Financing of Chamera project

    International Nuclear Information System (INIS)

    Jain, A.K.; Chakraborty, D.K.

    1994-01-01

    Chamera Hydroelectric Project was selected by National Hydroelectric Power Corporation (NHPC) as a pilot project for accelerated development of hydro-power in the country. This project was considered to have certain distinct specialties from different aspects in comparison with other projects. In the first place, the field investigation for the project was completed in a record time of only eight months by deploying the most modern techniques. Secondly, Chamera was the first NHPC project with external aid both technically and financially. The third and most important of all the specialties was in the planned reduction of construction period to 6 years from the original estimate of 8 years. Such reduction of gestation period was considered to be the direct outcome of modern method of management, monitoring and improved imported technology. The investment decision in the project was taken in April '84 with an estimated cost of energy at busbar 44.12 paise/unit exclusive of return on equity capital and royalty payable to the home state. The all inclusive rate of power was estimated 75.86 paise/unit. (author). 4 tabs

  8. SDN Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories Inc, Pullman, WA (United States)

    2016-12-23

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  9. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  10. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005 (abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the abstracts of the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  11. Isotopes Project

    International Nuclear Information System (INIS)

    Dairiki, J.M.; Browne, E.; Firestone, R.B.; Lederer, C.M.; Shirley, V.S.

    1984-01-01

    The Isotopes Project compiles and evaluates nuclear structure and decay data and disseminates these data to the scientific community. From 1940-1978 the Project had as its main objective the production of the Table of Isotopes. Since publication of the seventh (and last) edition in 1978, the group now coordinates its nuclear data evaluation efforts with those of other data centers via national and international nuclear data networks. The group is currently responsible for the evaluation of mass chains A = 167-194. All evaluated data are entered into the International Evaluated Nuclear Structure Data File (ENSDF) and are published in Nuclear Data Sheets. In addition to the evaluation effort, the Isotopes Project is responsible for production of the Radioactivity Handbook

  12. Guidelines for Automation Project Execution

    OpenAIRE

    Takkinen, Heidi

    2011-01-01

    The purpose of this Master’s thesis was to create instructions for executing an automation project. Sarlin Oy Ab needed directions on how to execute an automation project. Sarlin is starting up a new business area offering total project solutions for customers. Sarlin focuses on small and minor automation projects on domestic markets. The thesis represents issues related to project execution starting from the theory of the project to its kick-off and termination. Site work is one importan...

  13. The Role of the Project Management Office on Information Technology Project Success

    Science.gov (United States)

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  14. Project evaluation: main characteristics

    OpenAIRE

    Moutinho, Nuno

    2010-01-01

    — The evaluation process of real investment projects must consider not only the traditional financial approach, but also non-financial aspects. Non financial analysis can provide additional relevant information about projects. We investigate financial and non-financial areas most relevant in project appraisal. We present main critical success factors and areas of analysis that lead to the perception of project success. Finally, companies are segmented to verify its financial and non-financial...

  15. Draft project management update to the Iowa DOT Project Development Manual : final report.

    Science.gov (United States)

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  16. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  17. I-15 North Project

    Science.gov (United States)

    2013-11-05

    Goals of this project were as follows: (1) Conduct a comprehensive evaluation study on Nevada's I-15 North Design Build Project; (2) Analyze project implementation with respect to construction zone rules by which the contractor had to abide; (3) Anal...

  18. Fitting the project into the environment : Gulf Heavy Oil Red Cross Projects

    International Nuclear Information System (INIS)

    Sakires, D.G.; Johannesen, D.V.

    1998-01-01

    A reservoir delineation project by Gulf Canada's Heavy Oil Division was reviewed. The six well drilling program was completed in 1997 with minimal negative environmental impacts. The program, dubbed the Red Cross project, took place in the Northern Boreal Forest of Saskatchewan. Its success is attributed to the early involvement of the regulatory agencies in Saskatchewan, on-site environmental investigations, the development of an environmental protection plan, conscientious construction practices, a monitoring program during construction, and a pro-active reclamation plan. The project area is identified as being environmentally sensitive and important as a wildlife habitat area. This successful project demonstrated the usefulness of pre-project planning and team work between industry and the regulators. Details of the planning, construction and planned remedial reclamation actions are described. 11 refs., 2 tabs

  19. The ARCHER Project

    International Nuclear Information System (INIS)

    Knol, S.; Roelofs, F.; Fütterer, M.A.; Kohtz, N.; Laurie, M.; Buckthorpe, D.; Scheuermann, W.

    2014-01-01

    The European HTR R&D project ARCHER (Advanced High-Temperature Reactors for Cogeneration of Heat and Electricity R&D) builds on a solid HTR technology foundation in Europe, established through former national UK and German HTR programs and in European programs. ARCHER runs from 2011 to 2015 and targets selected HTR R&D subjects that would specifically support demonstration, with a focus on experimental effort. In line with the R&D and deployment strategy of the European Sustainable Nuclear Energy Technology Platform (SNETP) ARCHER contributes to maintaining, strengthening and expanding the HTR knowledge base in Europe to lay the foundations for demonstration of nuclear cogeneration with HTR systems. The project consortium encompasses conventional and nuclear industry, utilities, Technical Support Organizations, R&D organizations and academia. ARCHER shares results with international partners in the Generation IV International Forum and collaborates directly with related projects in the US, China, Japan, the Republic of Korea and South Africa. The ARCHER project is in its final year, and the paper comprises an overview of the achievements thus far for the different Sub Projects. (author)

  20. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  1. "Cheesy Pizza": The Pizza Project

    Science.gov (United States)

    Gallick, Barbara; Lee, Lisa

    2009-01-01

    A class of 3- to 5-year-old children in a midwestern child care center chose to study pizza restaurants as a group project. This article discusses how the project evolved, describes the three phases of the project, and provides the teachers' reflections on the project. Photos taken during the project and children's sketches are included. (Contains…

  2. Management of research and development project

    International Nuclear Information System (INIS)

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  3. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  4. Project management v praxi

    OpenAIRE

    Králová, Eliška

    2013-01-01

    Project management approaches are commonly used to write and implement business plans. In this thesis standard project management tools and methods are applied to a real project, which aims to improve the properties of the product it offers (an online educational game). This project is unique in that it is based on a voluntary basis, has limited resources and is very responsive to market demands. Project management is broken down into four stages according to the project life cycle: initiatio...

  5. Rethinking Project Management in Denmark

    DEFF Research Database (Denmark)

    Svejvig, Per

    2012-01-01

    . The chapter argues for a rethinking process due to pervasiveness and complexity in the contemporary project environment where rethinking is needed in order to stay competitive. The suggested approach for the rethinking project management is a framing process where body of ideas is established......Projects are everywhere across different sectors, industries and countries. Project management is no longer a sub-discipline of engineering and other rather technical disciplines but is also used for many other purposes. Even though practice has changed dramatically over the years, the models...... and methodologies for project management has been fairly static and has therefore received substantial criticism for a lack of relevance to practice. Several scholars have therefore started to think more widely about projects and project management conceptualized as rethinking project management. However this theme...

  6. Nuclear safety projects 1995

    International Nuclear Information System (INIS)

    Carl-Erik Christoffersen

    1996-01-01

    Action plans for the prevention of contamination in the Arctic regions is concretized in a number of international projects. The Norwegian Radiation Protection Authority is responsible for the follow-up of 13 projects. The report describes the development of these projects in 1995

  7. Project Management Performance Drivers

    OpenAIRE

    Ra’ad, Mohammed A.; Najdawi, Mohammad K.

    2010-01-01

    The practice of project management has gained enormous importance over the past several years in various business industries. “In industries as diverse as pharmaceuticals, software, and aerospace, projects drive business” (Wheatley). This gain of importance can be attributed to the magnitude of the impact project performance results in terms of time, cost, and scope have over the project performing entity. “On the basis of data released by the Bureau of Economic Analysis, part of the US De...

  8. Project management practice and its effects on project success in Malaysian construction industry

    Science.gov (United States)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  9. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region.

  10. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region

  11. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    Science.gov (United States)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  12. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    Science.gov (United States)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  13. The Alzheimer's Project

    Science.gov (United States)

    ... Navigation Bar Home Current Issue Past Issues The Alzheimer's Project Past Issues / Spring 2009 Table of Contents ... of this page please turn Javascript on. The Alzheimer's Project A 4-Part Documentary Series Starting May ...

  14. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  15. Project Management with IT Security Focus

    OpenAIRE

    Felician Alecu; Paul Pocatilu; Sergiu Capisizu

    2011-01-01

    The paper focus on the main key points related to the IT security project management. The most important lifecycle stages are identified: IT security project proposal definition, project organization, project planning, quality planning, project team organization, IT security project activities management and project closing. The most important success factors for IT security projects are the support of top-management, customer satisfaction, prevention over remediation and continuous progress....

  16. INDICATIVE MODEL OF DEVIATIONS IN PROJECT

    Directory of Open Access Journals (Sweden)

    Олена Борисівна ДАНЧЕНКО

    2016-02-01

    Full Text Available The article shows the process of constructing the project deviations indicator model. It based on a conceptual model of project deviations integrated management (PDIM. During the project different causes (such as risks, changes, problems, crises, conflicts, stress lead to deviations of integrated project indicators - time, cost, quality, and content. For a more detailed definition of where in the project deviations occur and how they are dangerous for the whole project, it needs to develop an indicative model of project deviations. It allows identifying the most dangerous deviations that require PDIM. As a basis for evaluation of project's success has been taken famous model IPMA Delta. During the evaluation, IPMA Delta estimated project management competence of organization in three modules: I-Module ("Individuals" - a self-assessment personnel, P-module ("Projects" - self-assessment of projects and/or programs, and O-module ("Organization" - used to conduct interviews with selected people during auditing company. In the process of building an indicative model of deviations in the project, the first step is the assessment of project management in the organization by IPMA Delta. In the future, built cognitive map and matrix of system interconnections of the project, which conducted simulations and built a scale of deviations for the selected project. They determined a size and place of deviations. To identify the detailed causes of deviations in the project management has been proposed to use the extended system of indicators, which is based on indicators of project management model Project Excellence. The proposed indicative model of deviations in projects allows to estimate the size of variation and more accurately identify the place of negative deviations in the project and provides the project manager information for operational decision making for the management of deviations in the implementation of the project

  17. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  18. Pingston hydroelectric project - stage 2 project report : volume 1 of 2

    International Nuclear Information System (INIS)

    1999-01-01

    The British Columbia Environmental Assessment Office has reviewed an application by Canadian Hydro Developers (B.C.) Inc., to develop the Pingston Hydroelectric Project, a run-of-river facility, located 60 km south of Revelstoke, British Columbia. The review includes an evaluation of any social and environmental impacts, including the effects on migratory birds, small mammals, amphibians, fish, wildlife, water quality, noise and visual aspects, that would be associated with the project. One consideration in selecting the project site was its ease of access along existing roadways and close proximity to power lines, another, the absence of any potential effects on fish and fish habitat. The project is also expected to have a negligible effect on water quality- related matters such as sediment transport, nutrient trapping in the headpond, and movement of large organic debris through the system. The project will not impact on archaeological resources, offers a renewable supply of energy and represents an overall positive effect on air quality for British Columbia. BC Hydro has committed to providing electrical interconnection to the main grid. 9 refs., 5 tabs., 14 figs., 9 appendices

  19. Assessment of Project Website Sustainability: Case of the Arctic EIA Project

    Directory of Open Access Journals (Sweden)

    Sonja H Bickford

    2016-07-01

    Full Text Available In many cases, temporary websites may be simple, accessible solutions for knowledge management and dissemination of information. However, such sites may become outdated as the funding ends, but yet in many cases, still publicly available through the Internet. The issue of website sustainability is a relevant topic for all organizations that have websites. Website lifecycle, knowledge management, and website sustainability issues are discussed through a theoretical-based literature review. These issues are then summarized and used as lessons learned for the case study approach of this paper. The aim is to identify a solution to address a website’s life and longevity, post project. A practical case study assessment of the issue of project website sustainability is needed to address the website’s longevity—post project—as creation is often made through temporary endeavors. Recommendations for future project websites are made as the outcomes and results of this study and are expressed in the form of suggested practices for project website sustainability in future projects.

  20. Projected coupled cluster theory.

    Science.gov (United States)

    Qiu, Yiheng; Henderson, Thomas M; Zhao, Jinmo; Scuseria, Gustavo E

    2017-08-14

    Coupled cluster theory is the method of choice for weakly correlated systems. But in the strongly correlated regime, it faces a symmetry dilemma, where it either completely fails to describe the system or has to artificially break certain symmetries. On the other hand, projected Hartree-Fock theory captures the essential physics of many kinds of strong correlations via symmetry breaking and restoration. In this work, we combine and try to retain the merits of these two methods by applying symmetry projection to broken symmetry coupled cluster wave functions. The non-orthogonal nature of states resulting from the application of symmetry projection operators furnishes particle-hole excitations to all orders, thus creating an obstacle for the exact evaluation of overlaps. Here we provide a solution via a disentanglement framework theory that can be approximated rigorously and systematically. Results of projected coupled cluster theory are presented for molecules and the Hubbard model, showing that spin projection significantly improves unrestricted coupled cluster theory while restoring good quantum numbers. The energy of projected coupled cluster theory reduces to the unprojected one in the thermodynamic limit, albeit at a much slower rate than projected Hartree-Fock.