WorldWideScience

Sample records for electrofishing removal project

  1. Evaluation of an Unsuccessful Brook Trout Electrofishing Removal Project in a Small Rocky Mountain Stream.

    Energy Technology Data Exchange (ETDEWEB)

    Meyer, Kevin A.; Lamansky, Jr., James A.; Schill, Daniel J.

    2006-01-26

    In the western United States, exotic brook trout Salvelinus fontinalis frequently have a deleterious effect on native salmonids, and biologists often attempt to remove brook trout from streams by means of electrofishing. Although the success of such projects typically is low, few studies have assessed the underlying mechanisms of failure, especially in terms of compensatory responses. A multiagency watershed advisory group (WAG) conducted a 3-year removal project to reduce brook trout and enhance native salmonids in 7.8 km of a southwestern Idaho stream. We evaluated the costs and success of their project in suppressing brook trout and looked for brook trout compensatory responses, such as decreased natural mortality, increased growth, increased fecundity at length, and earlier maturation. The total number of brook trout removed was 1,401 in 1998, 1,241 in 1999, and 890 in 2000; removal constituted an estimated 88% of the total number of brook trout in the stream in 1999 and 79% in 2000. Although abundance of age-1 and older brook trout declined slightly during and after the removals, abundance of age-0 brook trout increased 789% in the entire stream 2 years after the removals ceased. Total annual survival rate for age-2 and older brook trout did not decrease during the removals, and the removals failed to produce an increase in the abundance of native redband trout Oncorhynchus mykiss gairdneri. Lack of a meaningful decline and unchanged total mortality for older brook trout during the removals suggest that a compensatory response occurred in the brook trout population via reduced natural mortality, which offset the removal of large numbers of brook trout. Although we applaud WAG personnel for their goal of enhancing native salmonids by suppressing brook trout via electrofishing removal, we conclude that their efforts were unsuccessful and suggest that similar future projects elsewhere over such large stream lengths would be costly, quixotic enterprises.

  2. Validation of abundance estimates from mark-recapture and removal techniques for rainbow trout captured by electrofishing in small streams

    Science.gov (United States)

    Amanda E. Rosenberger; Jason B. Dunham

    2005-01-01

    Estimation of fish abundance in streams using the removal model or the Lincoln–Peterson mark–recapture model is a common practice in fisheries. These models produce misleading results if their assumptions are violated. We evaluated the assumptions of these two models via electrofishing of rainbow trout Oncorhynchus mykiss in central Idaho streams....

  3. Electrofishing capture probability of smallmouth bass in streams

    Science.gov (United States)

    Dauwalter, D.C.; Fisher, W.L.

    2007-01-01

    Abundance estimation is an integral part of understanding the ecology and advancing the management of fish populations and communities. Mark-recapture and removal methods are commonly used to estimate the abundance of stream fishes. Alternatively, abundance can be estimated by dividing the number of individuals sampled by the probability of capture. We conducted a mark-recapture study and used multiple repeated-measures logistic regression to determine the influence of fish size, sampling procedures, and stream habitat variables on the cumulative capture probability for smallmouth bass Micropterus dolomieu in two eastern Oklahoma streams. The predicted capture probability was used to adjust the number of individuals sampled to obtain abundance estimates. The observed capture probabilities were higher for larger fish and decreased with successive electrofishing passes for larger fish only. Model selection suggested that the number of electrofishing passes, fish length, and mean thalweg depth affected capture probabilities the most; there was little evidence for any effect of electrofishing power density and woody debris density on capture probability. Leave-one-out cross validation showed that the cumulative capture probability model predicts smallmouth abundance accurately. ?? Copyright by the American Fisheries Society 2007.

  4. Comparison of electrofishing techniques to detect larval lampreys in wadeable streams in the Pacific Northwest

    Science.gov (United States)

    Dunham, Jason B.; Chelgren, Nathan D.; Heck, Michael P.; Clark, Steven M.

    2013-01-01

    We evaluated the probability of detecting larval lampreys using different methods of backpack electrofishing in wadeable streams in the U.S. Pacific Northwest. Our primary objective was to compare capture of lampreys using electrofishing with standard settings for salmon and trout to settings specifically adapted for capture of lampreys. Field work consisted of removal sampling by means of backpack electrofishing in 19 sites in streams representing a broad range of conditions in the region. Captures of lampreys at these sites were analyzed with a modified removal-sampling model and Bayesian estimation to measure the relative odds of capture using the lamprey-specific settings compared with the standard salmonid settings. We found that the odds of capture were 2.66 (95% credible interval, 0.87–78.18) times greater for the lamprey-specific settings relative to standard salmonid settings. When estimates of capture probability were applied to estimating the probabilities of detection, we found high (>0.80) detectability when the actual number of lampreys in a site was greater than 10 individuals and effort was at least two passes of electrofishing, regardless of the settings used. Further work is needed to evaluate key assumptions in our approach, including the evaluation of individual-specific capture probabilities and population closure. For now our results suggest comparable results are possible for detection of lampreys by using backpack electrofishing with salmonid- or lamprey-specific settings.

  5. Modified sampling design for age-0 fish electrofishing at beach habitats

    Czech Academy of Sciences Publication Activity Database

    Janáč, Michal; Jurajda, Pavel

    2010-01-01

    Roč. 30, č. 5 (2010), s. 1210-1220 ISSN 0275-5947 R&D Projects: GA MŠk LC522 Institutional research plan: CEZ:AV0Z60930519 Keywords : young-of-the-year * electrofishing * sampling Subject RIV: EH - Ecology, Behaviour Impact factor: 1.203, year: 2010

  6. Validation of abundance estimates from mark–recapture and removal techniques for rainbow trout captured by electrofishing in small streams

    Science.gov (United States)

    Rosenberger, Amanda E.; Dunham, Jason B.

    2005-01-01

    Estimation of fish abundance in streams using the removal model or the Lincoln - Peterson mark - recapture model is a common practice in fisheries. These models produce misleading results if their assumptions are violated. We evaluated the assumptions of these two models via electrofishing of rainbow trout Oncorhynchus mykiss in central Idaho streams. For one-, two-, three-, and four-pass sampling effort in closed sites, we evaluated the influences of fish size and habitat characteristics on sampling efficiency and the accuracy of removal abundance estimates. We also examined the use of models to generate unbiased estimates of fish abundance through adjustment of total catch or biased removal estimates. Our results suggested that the assumptions of the mark - recapture model were satisfied and that abundance estimates based on this approach were unbiased. In contrast, the removal model assumptions were not met. Decreasing sampling efficiencies over removal passes resulted in underestimated population sizes and overestimates of sampling efficiency. This bias decreased, but was not eliminated, with increased sampling effort. Biased removal estimates based on different levels of effort were highly correlated with each other but were less correlated with unbiased mark - recapture estimates. Stream size decreased sampling efficiency, and stream size and instream wood increased the negative bias of removal estimates. We found that reliable estimates of population abundance could be obtained from models of sampling efficiency for different levels of effort. Validation of abundance estimates requires extra attention to routine sampling considerations but can help fisheries biologists avoid pitfalls associated with biased data and facilitate standardized comparisons among studies that employ different sampling methods.

  7. Monitoring fish distributions along electrofishing segments

    Science.gov (United States)

    Miranda, Leandro E.

    2014-01-01

    Electrofishing is widely used to monitor fish species composition and relative abundance in streams and lakes. According to standard protocols, multiple segments are selected in a body of water to monitor population relative abundance as the ratio of total catch to total sampling effort. The standard protocol provides an assessment of fish distribution at a macrohabitat scale among segments, but not within segments. An ancillary protocol was developed for assessing fish distribution at a finer scale within electrofishing segments. The ancillary protocol was used to estimate spacing, dispersion, and association of two species along shore segments in two local reservoirs. The added information provided by the ancillary protocol may be useful for assessing fish distribution relative to fish of the same species, to fish of different species, and to environmental or habitat characteristics.

  8. Electrofishing and Its Harmful Effects on Fish

    National Research Council Canada - National Science Library

    Snyder, Darrel

    2003-01-01

    ... to populations of endangered species. Spinal injuries and associated hemorrhages, although often not externally obvious or fatal, can occur anywhere in the electrofishing field at or above the intensity threshold for twitch...

  9. Unintended effects of electrofishing on nongame fishes

    Science.gov (United States)

    Miranda, Leandro E.; Kidwell, R. H.

    2010-01-01

    Most studies of injury associated with electrofishing have focused on game fishes, but few have given attention to cohabiting small nongame species. Under controlled laboratory conditions, we subjected small nongame cyprinids, ictalurids, and percids to a wide range of voltages and waveforms to examine potential harmful effects. Fish were treated with power levels distributed uniformly between the thresholds required to immobilize game fish and also were subjected multiple times to those thresholds to simulate the range of conditions that might exist in a heterogeneous electrical field formed during electrofishing in field situations. Across waveforms and species, the incidence of hemorrhages averaged 2% (range = 0–20%), the incidence of spinal injuries averaged 6% (range = 0–30%), and mortality averaged 16% (range = 0–90%). Continuous DC was generally less harmful than pulsed-DC waveforms; hemorrhages and spinal injuries tended to increase with high pulse frequencies, and mortalities tended to increase with low pulse frequencies. Ambiguities in the results were apparent, suggesting that some species may experience extensive harm, whereas others may not. Given the potential to harm numerically small populations and populations of imperiled species, we suggest (1) expanded efforts to overcome the power limitations that prevent effective use of continuous-DC electrofishing in many field situations and (2) pilot studies at geographic locations where numerically small populations of nongame species may be a concern.

  10. Electrofishing power requirements in relation to duty cycle

    Science.gov (United States)

    Miranda, L.E.; Dolan, C.R.

    2004-01-01

    Under controlled laboratory conditions we measured the electrical peak power required to immobilize (i.e., narcotize or tetanize) fish of various species and sizes with duty cycles (i.e., percentage of time a field is energized) ranging from 1.5% to 100%. Electrofishing effectiveness was closely associated with duty cycle. Duty cycles of 10-50% required the least peak power to immobilize fish; peak power requirements increased gradually above 50% duty cycle and sharply below 10%. Small duty cycles can increase field strength by making possible higher instantaneous peak voltages that allow the threshold power needed to immobilize fish to radiate farther away from the electrodes. Therefore, operating within the 10-50% range of duty cycles would allow a larger radius of immobilization action than operating with higher duty cycles. This 10-50% range of duty cycles also coincided with some of the highest margins of difference between the electrical power required to narcotize and that required to tetanize fish. This observation is worthy of note because proper use of duty cycle could help reduce the mortality associated with tetany documented by some authors. Although electrofishing with intermediate duty cycles can potentially increase effectiveness of electrofishing, our results suggest that immobilization response is not fully accounted for by duty cycle because of a potential interaction between pulse frequency and duration that requires further investigation.

  11. A comparison of point abundance and continuous sampling by electrofishing for age-0 fish in a channelized lowland river

    Czech Academy of Sciences Publication Activity Database

    Janáč, Michal; Jurajda, Pavel

    2007-01-01

    Roč. 27, č. 4 (2007), s. 1119-1125 ISSN 0275-5947 R&D Projects: GA MŠk LC522; GA AV ČR IAB6093106 Institutional research plan: CEZ:AV0Z60930519 Keywords : 0+ fish * electrofishing Subject RIV: EH - Ecology, Behaviour Impact factor: 1.127, year: 2007

  12. Effects of electro-fishing on galvano-taxis and carcass quality characteristics in sea bass (Dicentrarchus labrax

    Directory of Open Access Journals (Sweden)

    Edo D’Agaro

    2010-01-01

    Full Text Available The aim of this study was to investigate the effects of electro-fishing in sea water. We evaluated the feasibility of an electro-fishing system using numerical simulations for laboratory tanks and the open sea and performing a laboratory experiment. A non-homogeneous bi-dimensional electric-field model for marine water and fish based on discrete formulation of electro-magnetic field equations was developed using GAME (geometric approach for Maxwell equations software. Voltage gradients inside the fish and close to the body were determined. Re- sults showed that fish in the open sea and in groups had greater internal voltage differences than did fish in tanks and single fish. Sea bass (length:10 and 30 cm were exposed in laboratory tanks to pulsed direct current (PDC, 25-125 Hz and duty cycle (5-40%. We measured the electro-taxis and tetanus thresholds after electrical exposure. It is significant that these values decreased with increasing the size of fish. No differences were found after electro-fishing on overall appearance, internal and external haemorrhage, standard freshness scoring techniques and carcass quality characteristics

  13. Multinomial N-mixture models improve the applicability of electrofishing for developing population estimates of stream-dwelling Smallmouth Bass

    Science.gov (United States)

    Mollenhauer, Robert; Brewer, Shannon K.

    2017-01-01

    Failure to account for variable detection across survey conditions constrains progressive stream ecology and can lead to erroneous stream fish management and conservation decisions. In addition to variable detection’s confounding long-term stream fish population trends, reliable abundance estimates across a wide range of survey conditions are fundamental to establishing species–environment relationships. Despite major advancements in accounting for variable detection when surveying animal populations, these approaches remain largely ignored by stream fish scientists, and CPUE remains the most common metric used by researchers and managers. One notable advancement for addressing the challenges of variable detection is the multinomial N-mixture model. Multinomial N-mixture models use a flexible hierarchical framework to model the detection process across sites as a function of covariates; they also accommodate common fisheries survey methods, such as removal and capture–recapture. Effective monitoring of stream-dwelling Smallmouth Bass Micropterus dolomieu populations has long been challenging; therefore, our objective was to examine the use of multinomial N-mixture models to improve the applicability of electrofishing for estimating absolute abundance. We sampled Smallmouth Bass populations by using tow-barge electrofishing across a range of environmental conditions in streams of the Ozark Highlands ecoregion. Using an information-theoretic approach, we identified effort, water clarity, wetted channel width, and water depth as covariates that were related to variable Smallmouth Bass electrofishing detection. Smallmouth Bass abundance estimates derived from our top model consistently agreed with baseline estimates obtained via snorkel surveys. Additionally, confidence intervals from the multinomial N-mixture models were consistently more precise than those of unbiased Petersen capture–recapture estimates due to the dependency among data sets in the

  14. Electrofishing method improves evaluation of amphibian larvae abundance: a case of "beaver rivers".

    Science.gov (United States)

    Dgebuadze, Yury Y; Bashinskiy, Ivan V

    2017-07-01

    There are many locations in Russia where Eurasian beaver (Castor fiber) populations have been restored. As a keystone species, beavers provide wide-ranging direct and indirect impacts on aquatic ecosystems. In particular, beaver-created ponds are sites for spawning and nursery places for tadpoles of the brown frogs (genus Rana). Because of such impacts, study techniques for assessing aquatic organism abundance are being developed. We compared two methods for estimating tadpole abundance: traditional catches by dipnet and electrofishing. Our results show that the dipnet catch data for the shallower ponds with larger water surface area were five times lower than that obtained by electrofishing. Therefore, we conclude that dipnet catches are not suitable for comparing the relative abundance of tadpoles in the two beaver ponds that were studied. © 2016 International Society of Zoological Sciences, Institute of Zoology/Chinese Academy of Sciences and John Wiley & Sons Australia, Ltd.

  15. Population trends of smallmouth bass in the upper Colorado River basin with an evaluation of removal effects

    Science.gov (United States)

    Breton, André R.; Winkelman, Dana L.; Hawkins, John A.; Bestgen, Kevin R.

    2014-01-01

    Smallmouth bass Micropterus dolomieu were rare in the upper Colorado River basin until the early 1990’s when their abundance dramatically increased in the Yampa River sub-basin. Increased abundance was due primarily to colonization from Elkhead Reservoir, which was rapidly drawn down twice, first to make improvements to the dam (1992) and a second time for reservoir expansion (2005), and allowed escapement of resident bass to the river through an unscreened outlet. Elkhead Reservoir is located on Elkhead Creek, a tributary of the Yampa River. The rapid Elkhead Reservoir drawdown in 1992 was followed by a period of drought years with low, early runoff in the Yampa River sub-basin that benefitted smallmouth bass reproduction. This combination of factors allowed smallmouth bass to establish a self-sustaining population in the Yampa River. Subsequently, successful recruitment allowed smallmouth bass to disperse upstream and downstream in the Yampa River and eventually move into the downstream Green River. Smallmouth bass were also likely introduced, by unknown means, into the upper Colorado River and have since dispersed in this sub-basin. The rapid increase of smallmouth bass in the upper Colorado River basin overlapped with significant reductions in native fish populations in some locations. The threat to these native fishes initiated intensive mechanical removal of smallmouth bass by the Upper Colorado River Endangered Fish Recovery Program.In general, three factors explain fluctuating patterns in smallmouth bass density in the upper Colorado River basin in the last decade: reductions due to electrofishing removal, bass recovery after exploitation due to recruitment and immigration, and changes due to environmental factors not related to electrofishing and other management actions. Our analyses indicated that smallmouth bass densities were substantially reduced in most years by 7 electrofishing removal efforts. Less often, but dramatically in some cases

  16. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. USEPA DEMONSTRATION PROJECT AT CLIMAX, MN. PROJECT SUMMARY

    Science.gov (United States)

    This document is an eight page summary of the final report on arsenic demonstration project at Climax, MN (EPA/600/R-06/152). The objectives of the project are to evaluate the effectiveness of the Kinetico iron removal system in removing arsenic to meet the new arsenic maximum co...

  17. 30 years of data reveal dramatic increase in abundance of brown trout following the removal of a small hydrodam

    DEFF Research Database (Denmark)

    Birnie-Gauvin, Kim; Larsen, Martin Hage; Nielsen, Jan

    2017-01-01

    and spawning of fish. In the present study, we present thirty years of data from electrofishing surveys obtained at two sites, both prior to and following the removal of a small-scale hydropower dam in Central Jutland, Denmark. We demonstrate that the dam removal has led to a dramatic increase in trout density...

  18. Electrofishing mark-recapture and depletion methodologies evoke behavioral and physiological changes in cutthroat trout

    Science.gov (United States)

    Mesa, M. G.; Schreck, C.B.

    1989-01-01

    We examined the behavioral and physiological responses of wild and hatchery-reared cutthroat trout Oncorhynchus clarki subjected to a single electroshock, electroshock plus marking, and multiple electroshocks in natural and artificial streams. In a natural stream, cutthroat trout released after capture by electrofishing and marking showed distinct behavioral changes: fish immediately sought cover, remained relatively inactive, did not feed, and were easily approached by a diver. An average of 3–4 h was required for 50% of the fish to return to a seemingly normal mode of behavior, although responses varied widely among collection sites. Using the depletion method, we observed little change in normal behavior offish remaining in the stream section (i.e., uncaptured fish) after successive passes with electrofishing gear. In an artificial stream, hatchery-reared and wild cutthroat trout immediately decreased their rates of feeding and aggression after they were electroshocked and marked. Hatchery fish generally recovered in 2–3 h; wild fish required at least 24 h to recover. Analysis of feeding and aggression data by hierarchical rank revealed no distinct recovery trends among hatchery fish of different ranks; among wild cutthroat trout, however, socially dominant fish seemed to recover faster than intermediate and subordinate fish. Physiological indicators of stress (plasma cortisol and blood lactic acid) increased significantly in cutthroat trout subjected to electroshock plus marking or single or multiple electroshocks. As judged by the magnitude of the greatest change in cortisol and lactate, multiple electroshocks elicited the most severe stress response; however, plasma concentrations of both substances had returned to unstressed control levels by 6 h after treatment. It was evident that electrofishing and the procedures involved with estimating fish population size elicited a general stress response that was manifested not only physiologically but also

  19. Project plan remove special nuclear material from PFP project plutonium finishing plant

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  20. Project plan remove special nuclear material from PFP project plutonium finishing plant; TOPICAL

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617,Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  1. Project Plan For Remove Special Nuclear Material (SNM) from Plutonium Finishing Plant (PFP) Project

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove SNM Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617. This project plan is the top-level definitive project management document for the PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baseline to manage the execution of the Remove SNM Materials project. Any deviation to the document must be authorized through the appropriate change control process. The Remove SNM Materials project provides the necessary support and controls required for DOE-HQ, DOE-RL, BWHC, and other DOE Complex Contractors the path forward to negotiate shipped/receiver agreements, schedule shipments, and transfer material out of PFP to enable final deactivation

  2. Immobilization thresholds of electrofishing relative to fish size

    Science.gov (United States)

    Dolan, C.R.; Miranda, L.E.

    2003-01-01

    Fish size and electrical waveforms have frequently been associated with variation in electrofishing effectiveness. Under controlled laboratory conditions, we measured the electrical power required by five electrical waveforms to immobilize eight fish species of diverse sizes and shapes. Fish size was indexed by total body length, surface area, volume, and weight; shape was indexed by the ratio of body length to body depth. Our objectives were to identify immobilization thresholds, elucidate the descriptors of fish size that were best associated with those immobilization thresholds, and determine whether the vulnerability of a species relative to other species remained constant across electrical treatments. The results confirmed that fish size is a key variable controlling the immobilization threshold and further suggested that the size descriptor best related to immobilization is fish volume. The peak power needed to immobilize fish decreased rapidly with increasing fish volume in small fish but decreased slowly for fish larger than 75-100 cm 3. Furthermore, when we controlled for size and shape, different waveforms did not favor particular species, possibly because of the overwhelming effect of body size. Many of the immobilization inconsistencies previously attributed to species might simply represent the effect of disparities in body size.

  3. Effects of depletion sampling by standard three-pass pulsed DC electrofishing on blood chemistry parameters of fishes from Appalachian streams

    Science.gov (United States)

    Densmore, Christine L.; Panek, Frank M.

    2013-01-01

    Adverse effects on fishes captured by electrofishing techniques have long been recognized, although the extent of associated physical injury and behavioral alterations are highly variable and dependent on a number of factors. We examined the effects of three-pass pulsed DC (PDC) electrofishing on two salmonid species (Rainbow Trout Oncorhynchus mykiss and Brook Trout Salvelinus fontinalis) and five other genera (Green Sunfish Lepomis cyanellus, Potomac Sculpin Cottus girardi, Fathead Minnow Pimephales promelas, Largemouth Bass Micropterus salmoides, and Channel Catfish Ictalurus punctatus) common to Appalachian streams. We examined the corresponding effects of PDC electroshock on the following physiological indicators of stress and trauma: blood glucose and serum lactate, as well as on other blood chemistry, namely, enzymes, electrolytes, minerals, and proteins. All species demonstrated physiological responses to PDC electroshock, indicated by the biochemical differences in blood parameters in unshocked and shocked groups of fish with or without gross evidence of hemorrhagic trauma. Serum lactate was the most consistent indicator of these effects. Significant differences in whole blood glucose levels were also noted in treatment groups in all species except Green Sunfish, although the patterns observed were not as consistent as for serum lactate. Elevations in the serum enzymes, aspartate aminotransferase and creatine kinase, in the electroshocked fish occurred only in the two salmonid species. In many instances, although blood parameters were elevated in electroshocked fish compared with the unshocked controls for a given species, there were no differences in those levels in electroshocked fish based on the presence of gross hemorrhagic trauma to axial musculature. While some of the blood parameters examined correlated with both the occurrence of electroshock and the resultant tissue injury, there was no apparent link between the altered blood chemistry and

  4. Assessment of Native Salmonids Above Hells Canyon Dam, Idaho, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Meyer, Kevin A.; Lamansky, Jr., James A. (Idaho Department of Fish and Game, Boise, ID)

    2005-08-01

    In the western United States, exotic brook trout Salvelinus fontinalis frequently have a deleterious effect on native salmonids, and biologists often attempt to remove brook trout in streams using electrofishing. Although the success of electrofishing removal projects typically is low, few studies have assessed the underlying mechanisms of failure, especially in terms of compensatory responses. We evaluated the effectiveness of a three-year removal project in reducing brook trout and enhancing native salmonids in 7.8 km of an Idaho stream and looked for brook trout compensatory responses such as decreased natural mortality, increased growth, increased fecundity at length, or earlier maturation. Due to underestimates of the distribution of brook trout in the first year and personnel shortages in the third year, the multiagency watershed advisory group that performed the project fully treated the stream (i.e. multipass removals over the entire stream) in only one year. In 1998, 1999, and 2000, a total of 1,401, 1,241, and 890 brook trout were removed, respectively. For 1999 and 2000, an estimated 88 and 79% of the total number of brook trout in the stream were removed. For the section of stream that was treated in all years, the abundance of age-1 and older brook trout decreased by 85% from 1998 to 2003. In the same area, the abundance of age-0 brook trout decreased 86% from 1998 to 1999 but by 2003 had rebounded to near the original abundance. Abundance of native redband trout Oncorhynchus mykiss decreased for age-1 and older fish but did not change significantly for age-0 fish. Despite high rates of removal, total annual survival rate for brook trout increased from 0.08 {+-} 0.02 in 1998 to 0.20 {+-} 0.04 in 1999 and 0.21 {+-} 0.04 in 2000. Growth of age-0 brook trout was significantly higher in 2000 (the year after their abundance was lowest) compared to other years, and growth of age-1 and age-2 brook trout was significantly lower following the initial removal

  5. Lessons learned at the Fernald thorium removal project

    International Nuclear Information System (INIS)

    Boyd, R.

    1990-01-01

    In 1987, IT Corporation was awarded a subcontract through Rust Engineering Co. to provide decontamination and decommissioning services at the US Department of Energy Feed Materials Production Center (FMPC) near Fernald, Ohio. The work included the removal and repackaging of approximately 8,000 cubic feet of thorium oxide from several structures, including a silo, elevated bins, bucket elevators, and the silo understructure. The removal and repackaging project was undertaken because the integrity of the containment structures was questionable. Rust and Westinghouse (the operating contractor at FMPC) also felt that the repackaging and warehousing of the thorium would reduce occupational radiation exposure to site workers. Worker safety and environmental protection being of primary importance, the removal work was performed within specially-designed radiological containment facilities. The project presented challenges which, according to Westinghouse and Rust personnel, made it one of the most hazardous projects ever attempted at Fernald. Challenges included relations between non-union and union personnel, a strike by craft labor, interactions among DOE, EPA, and Westinghouse and their impact on a fixed-price contract, the impact of hazardous waste regulations, safe operations, and the contamination-free release of materials

  6. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    Science.gov (United States)

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  7. Removing Dams: Project-Level Policy and Scientific Research Needs (Invited)

    Science.gov (United States)

    Graber, B.

    2010-12-01

    More than 800 dams have been removed around the country, mostly “small” dams, under 25 feet in height. The total number of removals, however, is small relative to the number of deteriorating dams and the ecological impacts those structures continue to have on native riverine species and natural river function. The number of dam removal projects is increasing as aging dams continue to deteriorate and riverine species continue to decline. Practitioners and regulators need to find cost-effective project approaches that minimize short-term environmental impacts and maximize long-term benefits while keeping project costs manageable. Dam removals can be a regulatory challenge because they inherently have short-term impacts in order to achieve larger, self-sustaining, long-term benefits. These short-term impacts include sediment movement, construction access roads, and habitat conversion from lacustrine to riverine. Environmental regulations are designed to prevent degradation and have presented challenges for projects designed to benefit the environment. For example, a short-term release of sediment may exceed water quality standards for some period of time, but lead to a long-term beneficial project. Other regulatory challenges include permitting the loss of wetland area for increased native river function, or allowing the release of some level of contaminated sediment when the downstream sediment is similarly contaminated. Dam removal projects raise a range of engineering and scientific questions on effective implementation techniques such as appropriate sediment management approaches, construction equipment access approaches, invasive species management, channel/floodplain reconstruction, and active versus passive habitat rehabilitation. While practitioners have learned and refined implementation approaches over the last decade, more input is needed from researchers to help assess the effectiveness of those techniques, and to provide more effective techniques

  8. A change in strategy for a CERCLA Removal Action Demolition Project in progress results in overall project enhancements

    International Nuclear Information System (INIS)

    Albertin, M.; Nichols, R.M.; Edwards, D.T.

    1995-01-01

    This paper discusses changes made in a demolition project at the Fernald Environmental Management Project (FEMP), a site on the National Priorities list (NPL), owned by the Department of Energy. The project, to demolish fourteen uranium ore silos and their structure, was based on a Removal Action Work Plan, submitted and approved by the United States Environmental Protection Agency (USEPA), that integrated Comprehensive Environmental Response Compensation and Liability Act (CERCLA) requirements to remove the source of contamination and threat to public health and the environment. After the demolition contractor defaulted at 30% complete, completion of the project by the USEPA deadline was threatened. The recovery plan included re-evaluation of project documents in addition to the schedule. It was determined that re-interpretation of the removal action criteria, including design and Removal Action Work Plan, would eliminate road-blocks, and optimize resources, resulting in project completion by the original deadline even after lost-time in mobilizing another contractor. This presentation will discuss the open-quotes lessons learnedclose quotes by the project team and illustrate how simplification of construction methods resulted in enhancements to the environmental controls, improved material handing, and created a safer work environment

  9. South American Source Removal Project

    International Nuclear Information System (INIS)

    Nader, Alejandro V.

    2017-01-01

    Main objective of the project: •Thanks to Canada funding and IAEA technical assistance the main objective is to remove 29 disused sealed radioactive sources (DSRS), from 5 member states in Latin America region (Bolivia - Ecuador - Paraguay – Peru – Uruguay) to an authorized recipient for their final management. •It includes packaging of the DSRS and the DU working shields, customs arrangement for the export from the respective countries and import to the final destination in the Authorized Recipient’s country, transportation, deposit and hand over to an Authorized Recipient

  10. Debris Removal Project K West Canister Cleaning System Performance Specification

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    1999-01-01

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. Design criteria for a Canister Cleaning System to be installed in the KW Basin. This documents the requirements for design and installation of the system

  11. Functions and Requirements for Debris Removal System-Project A.2

    International Nuclear Information System (INIS)

    PRECECHTEL, D.R.

    1999-01-01

    This revision of the Functions and Requirements Document updates the approved Functions and Requirements for Debris Removal Subproject WHC-SD-SNF-FRD-009, Rev. 0. It has been revised in its entirety to reflect the current scope of work for Debris Removal as canisters and lids under the K Basin Projects work breakdown structure (WBS). In this revision the canisters and lids will be consider debris and a new set of Functions and Requirements have been developed to remove the canisters and lids from the basin

  12. An overview of ALARA considerations during Yankee Atomic`s Component Removal Project

    Energy Technology Data Exchange (ETDEWEB)

    Granados, B.; Babineau, G.; Colby, B.; Cox, B. [Yankee Nuclear Power Station, Rowe, MA (United States)

    1995-03-01

    In Februrary 1992, Yankee Atomic Electric Company (YAEC) permanently shutdown Yankee Nuclear Power Station in Rowe, Massachusetts, after thirty-two years of efficient operation. Yankee`s plan decommissioning is to defer dismantlement until a low level radioactive waste (LLRW) disposal facility is available. The plant will be maintained in a safe storage condition until a firm contract for the disposal of LLRW generated during decommissioning can be secured. Limited access to a LLRW disposal facility may occur during the safe storage period. Yankee intends to use these opportunities to remove components and structures. A Component Removal Project (CRP) was initiated in 1993 to take advantage of one of these opportunities. A Componenet Removal Project (CRP) was initiated in 1993 to take advantage of one of these opportunities. The CRP includes removal of four steam generators, the pressurizer, and segmentation of reactor vessel internals and preparation of LLRW for shipment and disposal at Chem-Nuclear`s Barnwell, South Carolina facility. The CRP is projected to be completed by June 1994 at an estimated total worker exposure of less than 160 person-rem.

  13. 30 years of data reveal dramatic increase in abundance of brown trout following the removal of a small hydrodam

    DEFF Research Database (Denmark)

    Birnie-Gauvin, Kim; Larsen, Martin Hage; Nielsen, Jan

    2017-01-01

    and spawning of fish. In the present study, we present thirty years of data from electrofishing surveys obtained at two sites, both prior to and following the removal of a small-scale hydropower dam in Central Jutland, Denmark. We demonstrate that the dam removal has led to a dramatic increase in trout density......Humans and freshwater ecosystems have a long history of cohabitation. Today, nearly all major rivers of the world have an in-stream structure which changes water flow, substrate composition, vegetation, and fish assemblage composition. The realization of these effects and their subsequent impacts...... on population sustainability and conservation has led to a collective effort aimed to find ways to mitigate these impacts. Barrier removal has recently received greater interest as a potential solution to restore river connectivity, and reestablish high quality habitats, suitable for feeding, refuge...

  14. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. USEPA DEMONSTRATION PROJECT AT CLIMAX, MN SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Climax, MN site. The objectives of the project are to evaluate (1) the effectiveness of Kinetico’s Macrolite®...

  15. Shippingport Station Decommissioning Project: Removal of piping and equipment and removal of primary system components

    International Nuclear Information System (INIS)

    1989-01-01

    This report is a technical synopsis of the removal of contaminated and non-contaminated piping and equipment from the Shippingport Station Decommissioning Project (SSDP). The information is provided as a part of the Technology Transfer Program to document dismantling activities in support of reactor decommissioning. 5 refs., 29 figs., 4 tabs

  16. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. U.S. EPA DEMONSTRATION PROJECT AT CLIMAX, MN. FINAL PERFORMANCE EVALUATION REPORT.

    Science.gov (United States)

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project following one year of operation at the Climax, Minnesota, site. The objectives of the project were to evaluate: (1) the effectiveness of Kin...

  17. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    International Nuclear Information System (INIS)

    A. M. Tyson

    2006-01-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project

  18. 77 FR 50916 - Safety Zone; Boston Harbor's Rock Removal Project, Boston Inner Harbor, Boston, MA

    Science.gov (United States)

    2012-08-23

    ... operation on the navigable waters of Boston Inner Harbor, in the main ship channel near Castle Island. This... operations in support of the U.S. Army Corps of Engineers rock removal project. Entering into, transiting... before the start date of the project. The U.S. Army Corps of Engineers also discussed the rock removal...

  19. Shippingport Station Decommissioning Project: Contaminated concrete removal: Topical report

    International Nuclear Information System (INIS)

    1989-01-01

    This Topical Report is a synopsis of the removal of contaminated concrete from the Shippingport Station Decommissioning Project (SSDP). The information is provided as a part of the Technology Transfer Program to document the decontamination activities in support of site release in the decommissioning of a nuclear power reactor. 4 refs., 8 figs., 2 tabs

  20. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA. U.S. EPA DEMONSTRATION PROJECT AT SPRINGFIELD, OH. PROJECT SUMMARY

    Science.gov (United States)

    This document is a eight page summary of the final report on arsenic demonstration project at the Chateau Estates Mobile Home Park in Springfield, OH. The objectives of the project are to evaluate the effectiveness of AdEdge Technologies’ AD-33 media in removing arsenic to meet t...

  1. Arsenic Removal from Drinking Water by Iron Removal. U.S. EPA Demonstration Project at Sabin, MN. Six-Month Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the EPA arsenic removal technology demonstration project at the Sabin, MN. The main objective of the project is to evaluate the effectiveness of the Kinetico FM-248-AS ars...

  2. Radioactive liquid wastes lines removal project at Los Alamos (1981-1986)

    International Nuclear Information System (INIS)

    Elder, J.C.; Cox, E.J.; Hohner, D.P.; Valentine, A.M.

    1986-09-01

    This report describes the abandoned liquid waste lines removal operations conducted at Los Alamos in the period 1981 to 1986. Particular emphasis has been placed on as-left conditions, that is, on the location of sections of waste lines or contaminated soil which were left in place on the basis of ALARA decisions. Contaminated items were left when interfering utilities, roads, structures, or great depth made complete removal not cost effective or not safe. Left items were either not highly contaminated or they were not near the surface. Total cost of the project was $4.2 million. Approximately 5800 m 3 of contaminated waste was placed in the Solid Waste Management Site at TA-54 Area G. The project accomplished the removal of approximately 34,500 ft (6.5 miles) of abandoned waste lines under carefully controlled conditions. Procedures for excavation, waste disposal, personnel protection, and radiation monitoring are described. Environmental monitoring criteria and methods for determining acceptable levels of contamination in soils and on surfaces are discussed

  3. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL AND ADSORPTIVE MEDIA USEPA DEMONSTRATION PROJECT AT STEWART, MN. SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the first six months of the EPA arsenic removal technology demonstration project at the Stewart, MN facility. The main objective of the project is to evaluate the effectiveness of Siemens¿ Type II AERALA...

  4. Carrier and aberrations removal in interferometric fringe projection profilometry

    Science.gov (United States)

    Blain, P.; Michel, F.; Renotte, Y.; Habraken, S.

    2012-04-01

    A profilometer which takes advantage of polarization states splitting technique and monochromatic light projection method as a way to overcome ambient lighting for in-situ measurement is under development [1, 2]. Because of the Savart plate which refracts two out of axis beams, the device suffers from aberrations (mostly coma and astigmatism). These aberrations affect the quality of the sinusoidal fringe pattern. In fringe projection profilometry, the unwrapped phase distribution map contains the sum of the object's shape-related phase and carrier-fringe-related phase. In order to extract the 3D shape of the object, the carrier phase has to be removed [3, 4]. An easy way to remove both the fringe carrier and the aberrations of the optical system is to measure the phases of the test object and to measure the phase of a reference plane with the same set up and to subtract both phase maps. This time consuming technique is suitable for laboratory but not for industry. We propose a method to numerically remove both the fringe carrier and the aberrations. A first reference phase of a calibration plane is evaluated knowing the position of the different elements in the set up and the orientation of the fringes. Then a fitting of the phase map by Zernike polynomials is computed [5]. As the triangulation parameters are known during the calibration, the computation of Zernike coefficients has only to be made once. The wavefront error can be adjusted by a scale factor which depends on the position of the test object.

  5. Projections of emissions and removals from the LULUCF sector to 2050

    OpenAIRE

    Thomson, Amanda; Buys, Gwen; Moxley, Janet; Malcolm, Heath; Henshall, Paul; Broadmeadow, Mark

    2017-01-01

    Summary for policy makers: • The UK reports projections for the Land Use, Land Use Change and Forestry (LULUCF) sector to inform policy concerning domestic and international climate change commitments. The full projections data are available on the NAEI website (http://naei.defra.gov.uk/reports/reports?report_id=927) • LULUCF activities can result in net annual emissions or removals of greenhouse gases, and changes in carbon stocks in the pools associated with LULUCF. This report prov...

  6. Projections of emissions and removals from the LULUCF sector to 2050

    OpenAIRE

    Buys, Gwen; Malcolm, Heath; Moxley, Janet; Matthews, Robert; Henshall, Paul

    2014-01-01

    • The UK is required to report projections for the Land Use, Land Use Change and Forestry (LULUCF) sector for carbon budgets under the UK Climate Change Act, for the European Union Monitoring Mechanism, and for the UN Framework Convention on Climate Change. LULUCF activities can result in net emissions or removals of greenhouse gases, and changes in carbon stocks in the pools associated with LULUCF. This report provides projections at the UK and Devolved Administration (DA) lev...

  7. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  8. Arsenic Removal from Drinking Water by Iron Removal and Adsorptive Media U.S. EPA Demonstration Project at Stewart, MN, Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the one-year U.S. Environmental Protection Agency (EPA) arsenic removal technology demonstration project at the Stewart, MN facility. The main objective of the project was to evaluate the effectiveness ...

  9. Cervical Spine Collar Removal by Emergency Room Nurses: A Quality Improvement Project.

    Science.gov (United States)

    Fontaine, Guillaume; Forgione, Massimo; Lusignan, Francis; Lanoue, Marc-André; Drouin, Simon

    2018-05-01

    The Canadian C-Spine Rule (CCR) is a clinical decision aid to facilitate the safe removal of cervical collars in the alert, orientated, low-risk adult trauma patient. Few health care settings have assessed initiatives to train charge nurses to use the CCR. This practice improvement project conducted in a secondary trauma center in Canada aimed to (1) train charge nurses of the emergency room to use the CCR, (2) monitor its use throughout the project period, and (3) compare the assessments of the charge nurses with those of emergency physicians. The project began with the creation of an interdisciplinary team. Clinical guidelines were established by the interdisciplinary project team. Nine charge nurses of the emergency room were then trained to use the CCR (3 on each 8-hour shift). The use of the CCR was monitored throughout the project period, from June 1 to October 5, 2016. The 3 aims of this practice improvement project were attained successfully. Over a 5-month period, 114 patients were assessed with the CCR. Charge nurses removed the cervical collars for 54 of 114 patients (47%). A perfect agreement rate (114 of 114 patients, 100%) was attained between the assessments of the nurses and those of physicians. This project shows that the charge nurses of a secondary trauma center can use the CCR safely on alert, orientated, and low-risk adult trauma patients as demonstrated by the agreement in the assessments of emergency room nurses and physicians. Crown Copyright © 2017. Published by Elsevier Inc. All rights reserved.

  10. Demographic changes following mechanical removal of exotic brown trout in an Intermountain West (USA), high-elevation stream

    Science.gov (United States)

    Saunders, W. Carl; Budy, Phaedra E.; Thiede, Gary P.

    2015-01-01

    Exotic species present a great threat to native fish conservation; however, eradicating exotics is expensive and often impractical. Mechanical removal can be ineffective for eradication, but nonetheless may increase management effectiveness by identifying portions of a watershed that are strong sources of exotics. We used mechanical removal to understand processes driving exotic brown trout (Salmo trutta) populations in the Logan River, Utah. Our goals were to: (i) evaluate the demographic response of brown trout to mechanical removal, (ii) identify sources of brown trout recruitment at a watershed scale and (iii) evaluate whether mechanical removal can reduce brown trout densities. We removed brown trout from 2 km of the Logan River (4174 fish), and 5.6 km of Right Hand Fork (RHF, 15,245 fish), a low-elevation tributary, using single-pass electrofishing. We compared fish abundance and size distributions prior to, and after 2 years of mechanical removal. In the Logan River, immigration to the removal reach and high natural variability in fish abundances limited the response to mechanical removal. In contrast, mechanical removal in RHF resulted in a strong recruitment pulse, shifting the size distribution towards smaller fish. These results suggest that, before removal, density-dependent mortality or emigration of juvenile fish stabilised adult populations and may have provided a source of juveniles to the main stem. Overall, in sites demonstrating strong density-dependent population regulation, or near sources of exotics, short-term mechanical removal has limited effects on brown trout populations but may help identify factors governing populations and inform large-scale management of exotic species.

  11. A novel background field removal method for MRI using projection onto dipole fields (PDF).

    Science.gov (United States)

    Liu, Tian; Khalidov, Ildar; de Rochefort, Ludovic; Spincemaille, Pascal; Liu, Jing; Tsiouris, A John; Wang, Yi

    2011-11-01

    For optimal image quality in susceptibility-weighted imaging and accurate quantification of susceptibility, it is necessary to isolate the local field generated by local magnetic sources (such as iron) from the background field that arises from imperfect shimming and variations in magnetic susceptibility of surrounding tissues (including air). Previous background removal techniques have limited effectiveness depending on the accuracy of model assumptions or information input. In this article, we report an observation that the magnetic field for a dipole outside a given region of interest (ROI) is approximately orthogonal to the magnetic field of a dipole inside the ROI. Accordingly, we propose a nonparametric background field removal technique based on projection onto dipole fields (PDF). In this PDF technique, the background field inside an ROI is decomposed into a field originating from dipoles outside the ROI using the projection theorem in Hilbert space. This novel PDF background removal technique was validated on a numerical simulation and a phantom experiment and was applied in human brain imaging, demonstrating substantial improvement in background field removal compared with the commonly used high-pass filtering method. Copyright © 2011 John Wiley & Sons, Ltd.

  12. Arsenic Removal from Drinking Water by Iron Removal U.S. EPA Demonstration Project at Sabin, MN Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from January 30, 2006 to April 29, 2007 at the U.S. Environmental Protection Agency (EPA) Arsenic Removal Technology Demonstration site in Sabin, MN. The main objective of the project was to evaluate the eff...

  13. Arsenic Removal from Drinking Water by Iron Removal - U.S. EPA Demonstration Project at Northeastern Elementary School in Fountain City, IN - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at Northeastern Elementary School in Fountain City, IN. The main objective of the project was to evaluate the effectiveness of US Water Sys...

  14. Treatment techniques for removing natural radionuclides from drinking water. Final report of the TENAWA project

    International Nuclear Information System (INIS)

    Annanmaeki, M.; Turtiainen, T.

    2000-01-01

    TENAWA project (Treatment Techniques for Removing Natural Radionuclides from Drinking Water) was carried out on a cost-shared basic with the European Commission (CEC) under the supervision of Directorate-General XII, Radiation Protection Unit. TENAWA project was started because in several European countries ground water supplies may contain high amounts of natural radionuclides. During the project both laboratory and field research was performed in order to test the applicability of different equipment and techniques for removing natural radionuclides from drinking water. The measurable objectives of the project were: to give recommendations on the most suitable methods for removing radon ( 222 Rn), uranium ( 238,234 U), radium ( 226 , 228 Ra), lead ( 210 Pb) and polonium ( 210 Po) from drinking water of different qualities (i.e. soft, hard, iron-, manganese- and humus-rich, acidic) to test commercially available equipment for its ability to remove radionuclides; to find new materials, absorbents and membranes effective in the removal of radionuclides and to issue guidelines for the treatment and disposal of radioactive wastes produced in water treatment. Radon could be removed efficiently (>95%) from domestic water supplies by both aeration and granular activated carbon (GAC) filtration. Defects in technical reliability or radon removal efficiency were observed in some aerators. The significant drawback of GAC filtration was the elevated gamma dose rates (up to 120 μSv/h) near the filter and the radioactivity of spent GAC. Aeration was found to be a suitable method for removing radon at waterworks, too. The removal efficiencies at waterworks where the aeration process was designed to remove radon or carbon dioxide were 67-99%. If the aeration process was properly designed, removal efficiencies higher than 95% could be attained. Uranium could best be removed (>95%) with strong basic anion exchange resins and radium by applying strong acidic cation exchange resins

  15. Treatment techniques for removing natural radionuclides from drinking water. Final report of the TENAWA project

    Energy Technology Data Exchange (ETDEWEB)

    Annanmaeki, M.; Turtiainen, T. [eds.

    2000-01-01

    TENAWA project (Treatment Techniques for Removing Natural Radionuclides from Drinking Water) was carried out on a cost-shared basic with the European Commission (CEC) under the supervision of Directorate-General XII, Radiation Protection Unit. TENAWA project was started because in several European countries ground water supplies may contain high amounts of natural radionuclides. During the project both laboratory and field research was performed in order to test the applicability of different equipment and techniques for removing natural radionuclides from drinking water. The measurable objectives of the project were: to give recommendations on the most suitable methods for removing radon ({sup 222}Rn), uranium ({sup 238,234}U), radium ({sup 226}, {sup 228}Ra), lead ({sup 210}Pb) and polonium ({sup 210}Po) from drinking water of different qualities (i.e. soft, hard, iron-, manganese- and humus-rich, acidic) to test commercially available equipment for its ability to remove radionuclides; to find new materials, absorbents and membranes effective in the removal of radionuclides and to issue guidelines for the treatment and disposal of radioactive wastes produced in water treatment. Radon could be removed efficiently (>95%) from domestic water supplies by both aeration and granular activated carbon (GAC) filtration. Defects in technical reliability or radon removal efficiency were observed in some aerators. The significant drawback of GAC filtration was the elevated gamma dose rates (up to 120 {mu}Sv/h) near the filter and the radioactivity of spent GAC. Aeration was found to be a suitable method for removing radon at waterworks, too. The removal efficiencies at waterworks where the aeration process was designed to remove radon or carbon dioxide were 67-99%. If the aeration process was properly designed, removal efficiencies higher than 95% could be attained. Uranium could best be removed (>95%) with strong basic anion exchange resins and radium by applying strong

  16. Arsenic Removal from Drinking Water by Iron Removal U.S. EPA Demonstration Project at Vintage on the Ponds in Delavan, WI Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at Vintage on the Ponds in Delavan, WI. The objectives of the project were to evaluate: (1) the effectiveness of a Kinetico Macrolite® press...

  17. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. U.S. EPA DEMONSTRATION PROJECT AT VILLAGE ON THE PONDS IN DELAVAN, WI. SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at Vintage on the Ponds at Delavan, WI. The objectives of the project are to evaluate: (1) the effectiveness of Kine...

  18. Orthogonal Projection-Based Harmonic Signal Removal for Operational Modal Analysis

    DEFF Research Database (Denmark)

    Gres, Szymon; Andersen, Palle; Hoen, C.

    2019-01-01

    A presence of a high amplitude periodic signals in the output responses from operating structures often pose a challenge for output-only system identification and, in case of health monitoring, damage detection/localization methods. This paper introduces a pre-processing approach that removes...... the harmonic part from the output signals directly in the time domain. The new method uses orthogonal projections of the harmonic realization of the signal onto the raw time series within the stochastic subspace framework. Proposed algorithm is tested on two experimental examples. First, an aluminum plate...... excited with both random white and periodic excitations. Second, a full-scale industrial case of a ferry excited by a random environmental load with harmonic interference from a rotating machinery on-board. In both cases the proposed method removes the harmonics from the structural responses while leaving...

  19. Kalispel Non-Native Fish Suppression Project 2007 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Wingert, Michele; Andersen, Todd [Kalispel Natural Resource Department

    2008-11-18

    Non-native salmonids are impacting native salmonid populations throughout the Pend Oreille Subbasin. Competition, hybridization, and predation by non-native fish have been identified as primary factors in the decline of some native bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi) populations. In 2007, the Kalispel Natural Resource Department (KNRD) initiated the Kalispel Nonnative Fish Suppression Project. The goal of this project is to implement actions to suppress or eradicate non-native fish in areas where native populations are declining or have been extirpated. These projects have previously been identified as critical to recovering native bull trout and westslope cutthroat trout (WCT). Lower Graham Creek was invaded by non-native rainbow (Oncorhynchus mykiss) and brook trout (Salvelinus fontinalis) after a small dam failed in 1991. By 2003, no genetically pure WCT remained in the lower 700 m of Graham Creek. Further invasion upstream is currently precluded by a relatively short section of steep, cascade-pool stepped channel section that will likely be breached in the near future. In 2008, a fish management structure (barrier) was constructed at the mouth of Graham Creek to preclude further invasion of non-native fish into Graham Creek. The construction of the barrier was preceded by intensive electrofishing in the lower 700 m to remove and relocate all captured fish. Westslope cutthroat trout have recently been extirpated in Cee Cee Ah Creek due to displacement by brook trout. We propose treating Cee Cee Ah Creek with a piscicide to eradicate brook trout. Once eradication is complete, cutthroat trout will be translocated from nearby watersheds. In 2004, the Washington Department of Fish and Wildlife (WDFW) proposed an antimycin treatment within the subbasin; the project encountered significant public opposition and was eventually abandoned. However, over the course of planning this 2004 project, little public

  20. The Carbon Dioxide Removal Model Intercomparison Project (CDRMIP): rationale and experimental protocol for CMIP6

    Science.gov (United States)

    Keller, David P.; Lenton, Andrew; Scott, Vivian; Vaughan, Naomi E.; Bauer, Nico; Ji, Duoying; Jones, Chris D.; Kravitz, Ben; Muri, Helene; Zickfeld, Kirsten

    2018-03-01

    The recent IPCC reports state that continued anthropogenic greenhouse gas emissions are changing the climate, threatening severe, pervasive and irreversible impacts. Slow progress in emissions reduction to mitigate climate change is resulting in increased attention to what is called geoengineering, climate engineering, or climate intervention - deliberate interventions to counter climate change that seek to either modify the Earth's radiation budget or remove greenhouse gases such as CO2 from the atmosphere. When focused on CO2, the latter of these categories is called carbon dioxide removal (CDR). Future emission scenarios that stay well below 2 °C, and all emission scenarios that do not exceed 1.5 °C warming by the year 2100, require some form of CDR. At present, there is little consensus on the climate impacts and atmospheric CO2 reduction efficacy of the different types of proposed CDR. To address this need, the Carbon Dioxide Removal Model Intercomparison Project (or CDRMIP) was initiated. This project brings together models of the Earth system in a common framework to explore the potential, impacts, and challenges of CDR. Here, we describe the first set of CDRMIP experiments, which are formally part of the 6th Coupled Model Intercomparison Project (CMIP6). These experiments are designed to address questions concerning CDR-induced climate reversibility, the response of the Earth system to direct atmospheric CO2 removal (direct air capture and storage), and the CDR potential and impacts of afforestation and reforestation, as well as ocean alkalinization.>

  1. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL USEPA DEMONSTRATION PROJECT AT BIG SAUK LAKE MOBILE HOME PARK IN SAUK CENTRE, MN. SIX MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Big Sauk Lake Mobile Home Park (BSLMHP) in Sauk Centre, MN. The objectives of the project are to evaluate the...

  2. The Carbon Dioxide Removal Model Intercomparison Project (CDRMIP: rationale and experimental protocol for CMIP6

    Directory of Open Access Journals (Sweden)

    D. P. Keller

    2018-03-01

    Full Text Available The recent IPCC reports state that continued anthropogenic greenhouse gas emissions are changing the climate, threatening severe, pervasive and irreversible impacts. Slow progress in emissions reduction to mitigate climate change is resulting in increased attention to what is called geoengineering, climate engineering, or climate intervention – deliberate interventions to counter climate change that seek to either modify the Earth's radiation budget or remove greenhouse gases such as CO2 from the atmosphere. When focused on CO2, the latter of these categories is called carbon dioxide removal (CDR. Future emission scenarios that stay well below 2 °C, and all emission scenarios that do not exceed 1.5 °C warming by the year 2100, require some form of CDR. At present, there is little consensus on the climate impacts and atmospheric CO2 reduction efficacy of the different types of proposed CDR. To address this need, the Carbon Dioxide Removal Model Intercomparison Project (or CDRMIP was initiated. This project brings together models of the Earth system in a common framework to explore the potential, impacts, and challenges of CDR. Here, we describe the first set of CDRMIP experiments, which are formally part of the 6th Coupled Model Intercomparison Project (CMIP6. These experiments are designed to address questions concerning CDR-induced climate reversibility, the response of the Earth system to direct atmospheric CO2 removal (direct air capture and storage, and the CDR potential and impacts of afforestation and reforestation, as well as ocean alkalinization.>

  3. Arsenic Removal from Drinking Water by Iron Removal - U.S. EPA Demonstration Project at Big Sauk Lake Mobile Home Park in Sauk Centre, MN Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the one-year arsenic removal treatment technology demonstration project at the Big Sauk Lake Mobile Home Park (BSLMHP) in Sauk Centre, MN. The objectives of the project are to evaluate (1) the effective...

  4. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA -- USEPA DEMONSTRATION PROJECT AT ROLLINSFORD, NH, SIX MONTH EVALUTION REPORT

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Rollinsford Water and Sewer District facility in Rollinsford, NH. The objectives of the project are to...

  5. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA, USEPA DEMONSTRATION PROJECT AT RIMROCK, AZ, SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at Rimrock, AZ. The objectives of the project are to evaluate the effectiveness of AdEdge Arsenic Package Uni...

  6. Project management plan for Waste Area Grouping 5 Old Hydrofracture Facility tanks contents removal at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-02-01

    This revision (Rev. 1) updates the schedule and designation of responsibilities for the Old Hydrofracture Facility (OHF) tanks contents removal project. Ongoing and planned future activities include: cold testing of the sluicing and pumping system; readiness assessment; equipment relocation and assembly; isotopic dilution of fissile radionuclides; sluicing and transfer of the tanks contents; and preparation of the Removal Action Completion Report. The most significant change is that the sluicing and pumping system has been configured by and will be operated by CDM Federal Programs Corporation. In addition, a new technical lead and a new project analyst have been designated within Lockheed Martin Energy Systems, Inc. and Lockheed Martin Energy Research Corp. The schedule for tanks contents removal has been accelerated, with transfer of the final batch of tank slurry now scheduled for March 31, 1998 (instead of November 10, 1998). The OHF sluicing and pumping project is proceeding as a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act. The purpose of the project is to remove the contents from five inactive underground storage tanks, designated T-1, T-2, T-3, T-4, and T-9. The tanks contain an estimated 52,700 gal of liquid and sludge, together comprising a radioactive inventory of approximately 30,000 Ci

  7. Decontamination of the Scrap Removal Room at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Bridenbaker, W.A.; Clemons, L.

    1987-02-01

    This report describes the decontamination and decommissioning (D and D) of the Scrap Removal Room (SRR) at the West Valley Demonstration Project (WVDP). The SRR is an area in the former reprocessing plant that is required for use in support of D and D for other plant areas. The SRR contained a 6.8 Mg (7.5-ton) crane for loading waste material into a shielded truck cask. It became radioactively contaminated during fuel reprocessing from 1966 to 1972. This report describes the work performed to accomplish the D and D objectives of removing existing piping and equipment and of reducing radiation and contamination levels, to As-Low-As-Reasonably-Achievable (ALARA) levels for the installation of new equipment. Also reported are pre- and post-radiological conditions, personnel exposure, radioactive waste volume collected, cost and schedule data, and lessons learned

  8. Juvenile salmonid monitoring in the White Salmon River, Washington, post-Condit Dam removal, 2016

    Science.gov (United States)

    Jezorek, Ian G.; Hardiman, Jill M.

    2017-06-23

    Condit Dam, at river kilometer 5.3 on the White Salmon River, Washington, was breached in 2011 and removed completely in 2012, allowing anadromous salmonids access to habitat that had been blocked for nearly 100 years. A multi-agency workgroup concluded that the preferred salmonid restoration alternative was natural recolonization with monitoring to assess efficacy, followed by a management evaluation 5 years after dam removal. Limited monitoring of salmon and steelhead spawning has occurred since 2011, but no monitoring of juveniles occurred until 2016. During 2016, we operated a rotary screw trap at river kilometer 2.3 (3 kilometers downstream of the former dam site) from late March through May and used backpack electrofishing during summer to assess juvenile salmonid distribution and abundance. The screw trap captured primarily steelhead (Oncorhynchus mykiss; smolts, parr, and fry) and coho salmon (O. kisutch; smolts and fry). We estimated the number of steelhead smolts at 3,851 (standard error = 1,454) and coho smolts at 1,093 (standard error = 412). In this document, we refer to O. mykiss caught at the screw trap as steelhead because they were actively migrating, but because we did not know migratory status of O. mykiss caught in electrofishing surveys, we simply refer to them as O. mykiss or steelhead/rainbow trout. Steelhead and coho smolts tagged with passive integrated transponder tags were subsequently detected downstream at Bonneville Dam on the Columbia River. Few Chinook salmon (O. tshawytscha) fry were captured, possibly as a result of trap location or effects of a December 2015 flood. Sampling in Mill, Buck, and Rattlesnake Creeks (all upstream of the former dam site) showed that juvenile coho were present in Mill and Buck Creeks, suggesting spawning had occurred there. We compared O. mykiss abundance data in sites on Buck and Rattlesnake Creeks to pre-dam removal data. During 2016, age-0 O. mykiss were more abundant in Buck Creek than in 2009 or

  9. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTION MEDIA USEPA DEMONSTRATION PROJECT AT BROWN CITY, MI SIX MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the arsenic removal treatment technology demonstration project in Brown City, MI. The objectives of the project are to evaluate the effectiveness of Severn Trent Services (...

  10. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Rollinsford, NH, Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at Rollinsford, New Hampshire. The objectives of the project were to evaluate: 1) the effectiveness of AdEdge Technologies’ AD -33TM media ...

  11. Arsenic Removal from Drinking Water by Coagulation/Filtration U.S. EPA Demonstration Project at Sandusky, MI. Six-Month Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the EPA arsenic removal technology demonstration project at the City of Sandusky, MI facility. The objectives of the project are to evaluate 1) the effectiveness of Siemen...

  12. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA. EPA DEMONSTRATION PROJECT AT QUEEN ANNES COUNTY, MARYLAND SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the community of Prospect Bay at Grasonville in Queen Anne’s County, MD. The objectives of the project were to ev...

  13. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Taos, NM, Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained for the EPA arsenic removal technology demonstration project at the Town of Taos in New Mexico. The main objective of the project was to evaluate the effectiveness of Severn Trent Services’ (STS) SORB 33™ ad...

  14. Quality assurance project plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    This quality assurance project plan defines project organization and roles of responsibility, sampling and field procedures, sample documentation and chain-of-custody protocols, equipment calibration, analytical procedures, data reduction and validation, and internal quality control procedures for the former YS-860 Firing Ranges removal action at the Oak Ridge Y-12 Plant. The ENTECH Team will maintain the highest standards to ensure strict compliance with this plan. Implementation of this plan will include consideration of the technical, as well as administrative, aspects of activities affecting quality. Plan implementation is based on the premise that quality controls selected for each element of work are consistent with the risk, importance, and health and safety considerations of performing the work. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of two small arms firing ranges. This plan covers the removal action at the former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification sampling, grading, and revegetation

  15. ARSENIC REMOVAL FROM DRINKING WATER BY PROCESS MODIFICATION TO COAGULATION/FILTRATION. USEPA DEMONSTRATION PROJECT AT LIDGERWOOD, ND. FINAL PERFORMANCE EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at the Lidgerwood, North Dakota site. The objectives of the project were to evaluate: (1) the effectiveness of process modifications to an e...

  16. 324 Building liquid waste handling and removal system project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ham, J.E.

    1998-07-29

    This report evaluates the modification options for handling radiological liquid waste generated during decontamination and cleanout of the 324 Building. Recent discussions indicate that the Hanford site railroad system will be closed by the end of FY 1998 necessitating the need for an alternate transfer method. The issue of handling of Radioactive Liquid Waste (RLW) from the 324 Building (assuming the 340 Facility is not available to accept the RLW) has been examined in at least two earlier engineering studies (Parsons 1997a and Hobart 1997). Each study identified a similar preferred alternative that included modifying the 324 Building RLWS to allow load-out of wastewater to a truck tanker, while making maximum use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes to the building. This alternative is accepted as the basis for further discussion presented in this study. The goal of this engineering study is to verify the path forward presented in the previous studies and assure that the selected alternative satisfies the 324 Building deactivation goals and objectives as currently described in the project management plan. This study will also evaluate options available to implement the preferred alternative and select the preferred option for implementation of the entire system. Items requiring further examination will also be identified. Finally, the study will provide a conceptual design, schedule and cost estimate for the required modifications to the 324 Building to allow removal of RLW. Attachment 5 is an excerpt from the project baseline schedule found in the Project Management Plan.

  17. Large-scale dam removal in the northeast United States: documenting ecological responses to the Penobscot River Restoration Project

    Science.gov (United States)

    Collins, M. J.; Aponte Clarke, G.; Baeder, C.; McCaw, D.; Royte, J.; Saunders, R.; Sheehan, T.

    2012-12-01

    The Penobscot River Restoration Project aims to improve aquatic connectivity in New England's second largest watershed ( 22,000 km2) by removing the two lowermost, mainstem dams and bypassing a third dam on a principal tributary upstream. Project objectives include: restoring unobstructed access to the entire historic riverine range for five lower river diadromous species including Atlantic and shortnose sturgeon; significantly improving access to upstream habitat for six upper river diadromous species including Atlantic salmon; reconnecting trophic linkages between headwater areas and the Gulf of Maine; restoring fluvial processes to the former impoundments; improving recreational and Penobscot Nation cultural opportunities; and maintaining basin-wide hydropower output. The project is expected to have landscape-scale benefits and the need for a significant investment in long-term monitoring and evaluation to formally quantify ecosystem response has been recognized. A diverse group of federal, state, tribal, NGO, and academic partners has developed a long-term monitoring and evaluation program composed of nine studies that began in 2009. Including American Recovery and Reinvestment Act (ARRA) funding that leveraged partner contributions, we have invested nearly $2M to date in pre- and post-removal investigations that evaluate geomorphology/bed sediment, water quality, wetlands, and fisheries. Given the number of affected diadromous species and the diversity of their life histories, we have initiated six distinct, but related, fisheries investigations to document these expected changes: Atlantic salmon upstream and downstream passage efficiency using passive integrated transponder (PIT) and acoustic telemetry; fish community structure via an index of biotic integrity (IBI); total diadromous fish biomass through hydroacoustics; shortnose sturgeon spawning and habitat use via active and passive acoustic telemetry; and freshwater-marine food web interactions by

  18. Big rock point restoration project BWR major component removal, packaging and shipping - planning and experience

    International Nuclear Information System (INIS)

    Milner, T.; Dam, S.; Papp, M.; Slade, J.; Slimp, B.; Nurden, P.

    2001-01-01

    The Big Rock Point boiling water reactor (BWR) at Charlevoix, MI was permanently shut down on August 29th 1997. In 1999 BNFL Inc.'s Reactor Decommissioning Group (RDG) was awarded a contract by Consumers Energy (CECo) for the Big Rock Point (BRP) Major Component Removal (MCR) project. BNFL Inc. RDG has teamed with MOTA, Sargent and Lundy and MDM Services to plan and execute MCR in support of the facility restoration project. The facility restoration project will be completed by 2005. Key to the success of the project has been the integration of best available demonstrated technology into a robust and responsive project management approach, which places emphasis on safety and quality assurance in achieving project milestones linked to time and cost. To support decommissioning of the BRP MCR activities, a reactor vessel (RV) shipping container is required. Discussed in this paper is the design and fabrication of a 10 CFR Part 71 Type B container necessary to ship the BRP RV. The container to be used for transportation of the RV to the burial site was designed as an Exclusive Use Type B package for shipment and burial at the Barnwell, South Carolina (SC) disposal facility. (author)

  19. 77 FR 59551 - Safety Zone, Changes to Original Rule; Boston Harbor's Rock Removal Project, Boston Inner Harbor...

    Science.gov (United States)

    2012-09-28

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2012-0767] RIN 1625-AA00 Safety Zone, Changes to Original Rule; Boston Harbor's Rock Removal Project, Boston Inner Harbor... original provisions of that temporary final rule, but adds two additional safety zones necessary for the...

  20. HIGH LEVEL WASTE MECHANCIAL SLUDGE REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT

    International Nuclear Information System (INIS)

    Jolly, R; Bruce Martin, B

    2008-01-01

    The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple intraarea

  1. HIGH LEVEL WASTE MECHANCIAL SLUDGE REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Jolly, R; Bruce Martin, B

    2008-01-15

    The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple

  2. Arsenic Removal from Drinking Water by Absorptive Media-U.S. EPA Demonstration Project at Desert Sands MDWCA, NM Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at the Desert Sands Mutual Domestic Water Consumers Association (MDWCA) facility in Anthony, NM. The objectives of the project were to evalu...

  3. Arsenic Removal from Drinking Water by Coagulation/Filtration - U.S. EPA Demonstration Project at Village of Waynesville, IL - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the arsenic removal drinking water treatment technology demonstration project at the Village of Waynesville, IL. The main objective of the project was to evaluate the effectiveness of the Peerless coagu...

  4. Arsenic Removal from Drinking Water by Coagulation/Filtration - U.S. EPA Demonstration Project at Town of Arnaudville, LA - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the arsenic removal treatment technology demonstration project at the United Water Systems’ facility in Arnaudville, LA. The objectives of the project were to evaluate: (1) the effectiveness of K...

  5. ALARA plan for the Old Hydrofracture Facility tanks contents removal project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-04-01

    The purpose of the Old Hydrofracture Facility (OHF) Tanks Contents Removal Project is to remove the liquid low-level waste from the five underground storage tanks located at OHF and transfer the resulting slurry to the Melton Valley Storage Tanks facility for treatment and disposal. Among the technical objectives for the OHF Project, there is a specific provision to maintain personnel exposures as low as reasonably achievable (ALARA) during each activity of the project and to protect human health and the environment. The estimated doses and anticipated conditions for accomplishing this project are such that an ALARA Plan is necessary to facilitate formal radiological review of the campaign. This ALARA Plan describes the operational steps necessary for accomplishing the job together with the associated radiological impacts and planned controls. Individual and collective dose estimates are also provided for the various tasks. Any significant changes to this plan (i.e., planned exposures that are greater than 10% of original dose estimates) will require formal revision and concurrence from all parties listed on the approval page. Deviations from this plan (i.e., work outside the scope covered by this plan) also require the preparation of a task-specific ALARA Review that will be amended to this plan with concurrence from all parties listed on the approval page

  6. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA - USEPA DEMONSTRATION PROJECT AT DESERT SANDS MDWCA, NM SIX MONTH EVALUATION

    Science.gov (United States)

    This report documents the activities performed during, and the results obtained from, the first six months of the arsenic removal treatment technology demonstration project at the Desert Sands Mutual Domestic Water Consumers Association (MDWCA) facility in Anthony, NM. The object...

  7. Arsenic Removal from Drinking Water by Coagulation/Filtration, U.S. EPA Demonstration Project at the City of Okanogan, WA - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the arsenic removal treatment technology demonstration project at the City of Okanogan, WA facility. The objectives of the project were to evaluate: (1) the effectiveness of Filtronics’ FH-13 Ele...

  8. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA USEPA DEMONSTRATION PROJECT AT VALLEY VISTA, AZ SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the first six months of the EPA arsenic removal technology demonstration project at the Arizona Water Company (AWC) facility in Sedona, AZ, commonly referred to as Valley Vista. The main objective of the...

  9. TMI defueling project fuel debris removal system

    International Nuclear Information System (INIS)

    Burdge, B.

    1992-01-01

    The three mile Island Unit 2 (TMI-2) pressurized water reactor loss-of-coolant accident on March 28, 1979, presented the nuclear community with many challenging remediation problems; most importantly, the removal of the fission products within the reactor containment vessel. To meet this removal problem, an air-lift system (ALS) can be used to employ compressed air to produce the motive force for transporting debris. Debris is separated from the transport stream by gravity separation. The entire method does not rely on any moving parts. Full-scale testing of the ALS at the Idaho National Engineering Laboratory (INEL) has demonstrated the capability of transporting fuel debris from beneath the LCSA into a standard fuel debris bucket at a minimum rate of 230 kg/min

  10. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Richmond Elementary School in Susanville, CA Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at Richmond Elementary School in Susanville, CA. The objectives of the project were to evaluate: (1) the effectiveness of an Aquatic Treatme...

  11. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Woodstock Middle School in Woodstock, CT - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed for and the results obtained from the arsenic removal treatment technology demonstration project at the Woodstock Middle School in Woodstock, CT. The objectives of the project were to evaluate the effectiveness of Adsorbsia™ GTO™ me...

  12. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Geneseo Hills Subdivision, in Geneseo, IL Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at the Geneseo Hills Subdivision in Geneseo, IL. The main objective of the project was to evaluate the effectiveness of AdEdge Technologies...

  13. Removal of radon by aeration testing of various aeration techniques for small water works. For European Commission under Contract No FI4PCT960054 TENAWA project

    CERN Document Server

    Salonen, L; Mehtonen, J; Mjoenes, L; Raff, O; Turunen, H

    2002-01-01

    Capability of various aeration techniques to remove radon from water in small waterworks was studied as a part of project (Treatment Techniques for Removing Natural Radionuclides from Drinking Water), which was carried out during 1997-1999 on a cost-shared basis (contract No. F14PCT960054) with The European Commission (CEC) under the supervision of the Directorate-General XII Radiation Protection Research Unit. In TENAWA project both laboratory and field experiments were performed in order to find reliable methods and equipment for removing natural radionuclides from ground water originating either from private wells or small waterworks. Because such techniques are more often needed in private households than at waterworks, the main emphasis of the research was aimed to solve the water treatment problems related to the private water supplies, especially bedrock wells. Radon was the most important radionuclide to be removed from water at waterworks whereas the removal of other radionuclides ( sup 2 sup 3 sup 4...

  14. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Seely-Brown Village in Pomfret, CT - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed for and the results obtained from the arsenic removal treatment technology demonstration project at Seely-Brown Village in Pomfret, CT. The objectives of the project were to evaluate the effectiveness of ArsenXnp adsorption media in...

  15. Possibilities for reduction of transverse projected emittances by partial removal of transverse to longitudinal beam correlations

    International Nuclear Information System (INIS)

    Balandin, V.; Decking, W.; Golubeva, N.

    2014-09-01

    We show that if in the particle beam there are linear correlations between energy of particles and their transverse positions and momenta (linear beam dispersions), then the transverse projected emittances always can be reduced by letting the beam to pass through magnetostatic system with specially chosen nonzero lattice dispersions. The maximum possible reduction of the transverse projected emittances occurs when all beam dispersions are zeroed, and the values of the lattice dispersions required for that are completely defined by the values of the beam dispersions and the beam rms energy spread and are independent from any other second-order central beam moments. Besides that, we prove that, alternatively, one can also use the lattice dispersions to remove linear correlations between longitudinal positions of particles and their transverse coordinates (linear beam tilts), but in this situation solution for the lattice dispersions is nonunique and the reduction of the transverse projected emittances is not guaranteed.

  16. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA U.S. EPA DEMONSTRATION PROJECT AT BRUNI, TX, SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Webb Consolidated Independent School District (Webb CISD) site at Bruni, TX. The main objective of the projec...

  17. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA U.S. EPA DEMONSTRATION PROJECT AT DUMMERSTON, VT SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months (from June 22, 2005 through December 22, 2005) of the arsenic removal treatment technology demonstration project at Charette Mobile Home Park (CMHP) in Dummerston, Vermont. T...

  18. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA. U.S. EPA DEMONSTRATION PROJECT AT BOW, NH , SIX MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the White Rock Water Company (WRWC) public water system, a small residential drinking water facility in Bo...

  19. PROJECT-SPECIFIC TYPE A VERIFICATION FOR THE HIGH FLUX BEAM REACTOR UNDERGROUND UTILITIES REMOVAL PHASE 2 D/F WASTE LINE REMOVAL, BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK

    International Nuclear Information System (INIS)

    Weaver, P.C.

    2010-01-01

    Oak Ridge Institute for Science and Education (ORISE) has reviewed the project documentation and data for the High Flux Beam Reactor (HFBR) Underground Utilities removal Phase 2; the D/F Waste Line removal at Brookhaven National Laboratory (BNL) in Upton, New York. The Brookhaven Survey Group (BSG) has completed removal and performed the final status survey (FSS) of the D/F Waste Line that provided the conduit for pumping waste from Building 750 to Building 801. Sample results have been submitted as required to demonstrate that the cleanup goals of 15 mrem/yr above background to a resident in 50 years have been met. Four rounds of sampling, from pre-excavation to final status survey (FSS), were performed as specified in the Field Sampling Plan (FSP) (BNL 2010a). It is the policy of the US Departmental of Energy (DOE) to perform independent verifications of decontamination and decomissioning activities conducted at DOE facilities. ORISE has been designated as the organization responsible for this task at the HFBR. ORISE together with DOE determined that a Type A verification of the D/F Waste Line was appropriate based on its method of construction and upon the minimal potential for residual radioactivity in the area. The removal of underground utilities is being performed in three stages in the process to decommission the HFBR facility and support structures. Phase 2 of this project included the grouting and removal of 1100 feet of 2-inch pipe and 640 feet of 4-inch pipe that served as the D/F Waste Line. Based on the pre-excavation sample results of the soil overburden, the potential for contamination of the soil surrounding the pipe is minimal (BNL 2010a). ORISE reviewed the BNL FSP and identified comments for consideration (ORISE 2010). BNL prepared a revised FSP that addressed each ORISE comment adequately (BNL 2010a). ORISE referred to the revised Phase 2 D/F Waste Line removal FSP FSS data to conduct the Type A verification and determine whether the intent odf

  20. Removal of radon by aeration: testing of various aeration techniques for small water works. For European Commission under Contract No FI4PCT960054 TENAWA project

    International Nuclear Information System (INIS)

    Salonen, L.; Mehtonen, J.; Turunen, H.; Mjoenes, L.; Hagberg, N.; Raff, O.

    2002-12-01

    Capability of various aeration techniques to remove radon from water in small waterworks was studied as a part of project (Treatment Techniques for Removing Natural Radionuclides from Drinking Water), which was carried out during 1997-1999 on a cost-shared basis (contract No. F14PCT960054) with The European Commission (CEC) under the supervision of the Directorate-General XII Radiation Protection Research Unit. In TENAWA project both laboratory and field experiments were performed in order to find reliable methods and equipment for removing natural radionuclides from ground water originating either from private wells or small waterworks. Because such techniques are more often needed in private households than at waterworks, the main emphasis of the research was aimed to solve the water treatment problems related to the private water supplies, especially bedrock wells. Radon was the most important radionuclide to be removed from water at waterworks whereas the removal of other radionuclides ( 234,238 U, 226,228 Ra, 210 Pb and 210 Po) was oft required from radonrich bedrock waters. The currently available methods and equipment were mainly tested during the field and laboratory experiments but the project was also aimed to find new materials, absorbents and membranes applicable for radionuclide removal from various types of ground waters (e.g. soft, hard, acidic). Because iron, manganese or organic occur in waters with radionuclides, their simultaneous removal was also studied. The project was divided into 13 work packages. In this report the results of the work package 2.2 are described. Elevated levels of radon and other natural radionuclides in European ground waters have been observed mainly in wide areas of the crystalline Scandinavian bedrock, especially in the granite rock areas of Finland and Sweden but also in more limited crystalline rock areas of Central and Southern Europe, Ukraine and Scotland. The radon removal efficiencies of different aeration methods

  1. ARSENIC REMOVAL FROM DRINKING WATER BY POINT OF USE REVERSE OSMOSIS. EPA DEMONSTRATION PROJECT AT SUNSET RANCH DEVELOPMENT IN HOMEDALE, ID. SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the point of use arsenic removal treatment technology demonstration project at the Sunset Ranch Development in Homedale, ID. The objectives of the project are to evaluate t...

  2. Spent Nuclear Fuel (SNF) Removal Campaign Plan

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The overall operation of the Spent Nuclear Fuel Project will include fuel removal, sludge removal, debris removal, and deactivation transition activities. Figure 1-1 provides an overview of the current baseline operating schedule for project sub-systems, indicating that a majority of fuel removal activities are performed over an approximately three-and-one-half year time period. The purpose of this document is to describe the strategy for operating the fuel removal process systems. The campaign plan scope includes: (1) identifying a fuel selection sequence during fuel removal activities, (2) identifying MCOs that are subjected to extra testing (process validation) and monitoring, and (3) discussion of initial MCO loading and monitoring in the Canister Storage Building (CSB). The campaign plan is intended to integrate fuel selection requirements for handling special groups of fuel within the basin (e.g., single pass reactor fuel), process validation activities identified for process systems, and monitoring activities during storage

  3. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Webb Consolidated Independent School District in Bruni, TX - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at the Webb Consolidated Independent School District (Webb CISD) in Bruni, TX. The main objective of the project was to evaluate the effect...

  4. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Hot Springs Mobile Home Park in Willard, Utah - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents activities performed for and results obtained from the arsenic removal treatment technology demonstration project at the Hot Springs Mobile Home Park (HSMHP) in Willard, UT. The objectives of the project were to evaluate the effectiveness of Adsorbsia™ GTO™...

  5. Arsenic Removal from Drinking Water by Adsorptive Media, U.S. EPA Demonstration Project at LEADS Head Start Building in Buckeye Lake, OH - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at Licking Economic Action Development Study (LEADS) Head Start School in Buckeye Lake, Ohio. The objectives of the project were to evaluate...

  6. DEMETERRES project: development of innovative technologies for removing radionuclides from contaminated solid and liquid matrices

    Science.gov (United States)

    Chagvardieff, Pierre; Barré, Yves; Blin, Virginie; Faure, Sylvain; Fornier, Anne; Grange, Didier; Grandjean, Agnès; Guiderdoni, Emmanuel; Henner, Pascale; Siroux, Brice; Leybros, Antoine; Messalier, Marc; Paillard, Hervé; Prévost, Thierry; Rennesson, Malvina; Sarrobert, Catherine; Vavasseur, Alain; Véry, Anne-Aliénor

    2017-09-01

    As part of the « post-accidental » management, the DEMETERRES project (RSNR PIA) proposes to develop innovative and environmentally friendly methods for removal of cesium and strontium from soils and liquid matrices in order to rehabilitate them for an agricultural use while minimizing the volume of generated wastes in accordance with the nuclear waste existing processes. Complementary approaches are used: they are based on physico-chemical technologies (such as foams flotation, supercritical CO2 extraction, extractants in fluidized bed reactor …) and biological ones (bioextractants, phytoextraction) which concepts are described. These researches aim to design innovative and performing extractants in term of selectivity and to achieve the pilot reactor phase for each of them. These pilots will group in a network to provide a technological platform lasting the project, to which will be attached an available network of experts. The respective advances of these researches are presented, completed of tests initiated in Japan on contaminated soils through partnerships.

  7. DEMETERRES project: development of innovative technologies for removing radionuclides from contaminated solid and liquid matrices

    Directory of Open Access Journals (Sweden)

    Chagvardieff Pierre

    2017-01-01

    Full Text Available As part of the « post-accidental » management, the DEMETERRES project (RSNR PIA proposes to develop innovative and environmentally friendly methods for removal of cesium and strontium from soils and liquid matrices in order to rehabilitate them for an agricultural use while minimizing the volume of generated wastes in accordance with the nuclear waste existing processes. Complementary approaches are used: they are based on physico-chemical technologies (such as foams flotation, supercritical CO2 extraction, extractants in fluidized bed reactor … and biological ones (bioextractants, phytoextraction which concepts are described. These researches aim to design innovative and performing extractants in term of selectivity and to achieve the pilot reactor phase for each of them. These pilots will group in a network to provide a technological platform lasting the project, to which will be attached an available network of experts. The respective advances of these researches are presented, completed of tests initiated in Japan on contaminated soils through partnerships.

  8. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Covered Wells in Tohono O’odham Nation, AZ - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at Covered Wells in Tohono O’odham Nation, AZ. The main objective of the project was to evaluate the effectiveness of AdEdge Technologies’ ...

  9. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA U.S. EPA DEMONSTRATION PROJECT AT SPRING BROOK MOBILE HOME PARK IN WALES, ME SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Spring Brook Mobile Home Park in Wales, ME. The objectives of the project are to evaluate the effectiv...

  10. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA U.S. EPA DEMONSTRATION PROJECT AT CHATEAU ESTATES MOBILE HOME PARK IN SPRINGFIELD, OH. SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed for and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Chateau Estates Mobile Home Park at Springfield, OH. The objectives of the project are to evaluate the ef...

  11. Littoral age 0+ fish distribution in relation to multi-scale spatial heterogeneity of a deep-valley reservoir

    Czech Academy of Sciences Publication Activity Database

    Kratochvíl, Michal; Mrkvička, Tomáš; Vašek, Mojmír; Peterka, Jiří; Čech, Martin; Draštík, Vladislav; Jůza, Tomáš; Matěna, Josef; Muška, Milan; Seďa, Jaromír; Znachor, Petr; Kubečka, Jan

    2012-01-01

    Roč. 696, č. 1 (2012), s. 185-198 ISSN 0018-8158 R&D Projects: GA MZe(CZ) QH81046 Institutional research plan: CEZ:AV0Z60170517 Keywords : habitat preference * electrofishing * growing season * slope steepness * percids * cyprinids Subject RIV: EH - Ecology, Behaviour Impact factor: 1.985, year: 2012

  12. Arsenic Removal from Drinking Water by Oxidation/Filtration and Adsorptive Media, U.S. EPA Demonstration Project at Clinton Christian School in Goshen, IN - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed for and the results obtained from the arsenic removal treatment technology demonstration project at the Clinton Christian School in Goshen, IN. The objectives of the project were to evaluate the effectiveness of AdEdge Technologies’...

  13. Innovative CO2 LASER-Based Pavement Striping and Stripe Removal

    Science.gov (United States)

    2014-07-01

    This is a Technical Report of an FY2014 NDOT funded project on Innovative CO2 Laserbased Pavement Striping and Stripe Removal. The project was concerned with adopting the laser technology for pavement stripe and markers removal and inferring on its e...

  14. STATUS OF MECHANICAL SLUDGE REMOVAL AND COOLING COILS CLOSURE AT THE SAVANNAH RIVER SITE - F TANK FARM CLOSURE PROJECT - 9225

    Energy Technology Data Exchange (ETDEWEB)

    Jolly, R

    2009-01-06

    The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal using the Waste on Wheels (WOW) system within two of its storage tanks. The Waste on Wheels (WOW) system is designed to be relatively mobile with the ability for many components to be redeployed to multiple tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2839 cubic meters (750,000 gallons) each. In addition, Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. DOE intends to remove from service and operationally close Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. After obtaining regulatory approval, the tanks and cooling coils will be isolated and filled with grout for long term stabilization. Mechanical Sludge Removal of the remaining sludge waste within Tank 6 removed {approx} 75% of the original 25,000 gallons in August 2007. Utilizing lessons learned from Tank 6, Tank 5 Mechanical Sludge Removal completed removal of {approx} 90% of the original 125 cubic meters (33,000 gallons) of sludge material in May 2008. The successful removal of sludge material meets the requirement of approximately 19 to 28 cubic meters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. The Chemical Cleaning Process will utilize 8 wt% oxalic acid to dissolve the remaining sludge heel. The flow sheet for Chemical Cleaning planned a 20:1 volume ratio of acid to sludge for the first strike with mixing provided by the submersible mixer pumps. The subsequent strikes will utilize a 13:1 volume ratio of acid to sludge with no mixing. The results of the Chemical Cleaning Process are detailed in the &apos

  15. Towards a better understanding of small scale distribution of littoral age-0 fish in a deep-valley reservoir: day or night surveys?

    Czech Academy of Sciences Publication Activity Database

    Kratochvíl, Michal; Vašek, Mojmír; Peterka, Jiří; Draštík, Vladislav; Čech, Martin; Jůza, Tomáš; Muška, Milan; Matěna, Josef; Kubečka, Jan

    2014-01-01

    Roč. 728, č. 1 (2014), s. 125-139 ISSN 0018-8158 R&D Projects: GA MŠk(CZ) EE2.3.20.0204 Institutional support: RVO:60077344 Keywords : spatial distribution * habitat use * juvenile fish * littoral zone * deep reservoirs * electrofishing Subject RIV: EH - Ecology, Behaviour Impact factor: 2.275, year: 2014

  16. Ethical considerations related to participation and partnership: an investigation of stakeholders' perceptions of an action-research project on user fee removal for the poorest in Burkina Faso.

    Science.gov (United States)

    Hunt, Matthew R; Gogognon, Patrick; Ridde, Valéry

    2014-02-20

    Healthcare user fees present an important barrier for accessing services for the poorest (indigents) in Burkina Faso and selective removal of fees has been incorporated in national healthcare planning. However, establishing fair, effective and sustainable mechanisms for the removal of user fees presents important challenges. A participatory action-research project was conducted in Ouargaye, Burkina Faso, to test mechanisms for identifying those who are indigents, and funding and implementing user fee removal. In this paper, we explore stakeholder perceptions of ethical considerations relating to participation and partnership arising in the action-research. We conducted 39 in-depth interviews to examine ethical issues associated with the action-research. Respondents included 14 individuals identified as indigent through the community selection process, seven members of village selection committees, six local healthcare professionals, five members of the management committees of local health clinics, five members of the research team, and four regional or national policy-makers. Using constant comparative techniques, we carried out an inductive thematic analysis of the collected data. The Ouargaye project involved a participatory model, included both implementation and research components, and focused on a vulnerable group within small, rural communities. Stakeholder perceptions and experiences relating to the participatory approach and reliance on multiple partnerships in the project were associated with a range of ethical considerations related to 1) seeking common ground through communication and collaboration, 2) community participation and risk of stigmatization, 3) impacts of local funding of the user fee removal, 4) efforts to promote fairness in the selection of the indigents, and 5) power relations and the development of partnerships. This investigation of the Ouargaye project serves to illuminate the distinctive ethical terrain of a participatory public

  17. Project management plan for Waste Area Grouping 5 Old Hydrofracture Facility tanks content removal at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-07-01

    The purpose of the Old Hydrofracture Facility (OHF) tanks content removal project is to transfer inventory from the five OHF tanks located in Waste Area Grouping (WAG) 5 at Oak Ridge National Laboratory (ORNL) to the Melton Valley Storage Tanks (MVST) liquid low-level (radioactive) waste (LLLW) storage facility, and remediate the remaining OHF tank shells. The major activities involved are identified in this document along with the organizations that will perform the required actions and their roles and responsibilities for managing the project

  18. Compliance Monitoring of Underwater Blasting for Rock Removal at Warrior Point, Columbia River Channel Improvement Project, 2009/2010

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.; Woodley, Christa M.; Skalski, J. R.; Seaburg, Adam

    2011-05-10

    The U.S. Army Corps of Engineers, Portland District (USACE) conducted the 20-year Columbia River Channel Improvement Project (CRCIP) to deepen the navigation channel between Portland, Oregon, and the Pacific Ocean to allow transit of fully loaded Panamax ships (100 ft wide, 600 to 700 ft long, and draft 45 to 50 ft). In the vicinity of Warrior Point, between river miles (RM) 87 and 88 near St. Helens, Oregon, the USACE conducted underwater blasting and dredging to remove 300,000 yd3 of a basalt rock formation to reach a depth of 44 ft in the Columbia River navigation channel. The purpose of this report is to document methods and results of the compliance monitoring study for the blasting project at Warrior Point in the Columbia River.

  19. ARSENIC REMOVAL FROM DRINKING WATER BY POINT-OF-USE (POU) REVERSE OSMOSIS. U.S. EPA DEMONSTRATION PROJECT AT SUNSET RANCH DEVELOPMENT IN HOMEDALE, ID. FINAL PERFORMANCE EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the arsenic removal technology demonstration project at the Sunset Ranch Development in Homedale, ID. The objectives of the project are to evaluate: 1) the effectiveness of a point of use (POU) re...

  20. Science partnership between U.S. Geological Survey and the Lower Elwha Klallam Tribe—Understanding the Elwha River Dam Removal Project

    Science.gov (United States)

    Duda, Jeffrey J.; Beirne, Matt M.; Warrick, Jonathan A.; Magirl, Christopher S.

    2018-04-16

    After nearly a century of producing power, two large hydroelectric dams on the Elwha River in Washington State were removed during 2011 to 2014 to restore the river ecosystem and recover imperiled salmon populations. Roughly two-thirds of the 21 million cubic meters of sediment—enough to fill nearly 2 million dump trucks—contained behind the dams was released downstream, which restored natural processes and initiated important changes to the river, estuarine, and marine ecosystems. A multidisciplinary team of scientists from the Lower Elwha Klallam Tribe, academia, non-governmental organizations, Federal and state agencies, and the U.S. Geological Survey collected key data before, during, and after dam removal to understand the outcomes of this historic project on the Elwha River ecosystem.

  1. Benzotriazole removal on post-Cu CMP cleaning

    Science.gov (United States)

    Jiying, Tang; Yuling, Liu; Ming, Sun; Shiyan, Fan; Yan, Li

    2015-06-01

    This work investigates systematically the effect of FA/O II chelating agent and FA/O I surfactant in alkaline cleaning solutions on benzotriazole (BTA) removal during post-Cu CMP cleaning in GLSI under the condition of static etching. The best detergent formulation for BTA removal can be determined by optimization of the experiments of single factor and compound cleaning solution, which has been further confirmed experimentally by contact angle (CA) measurements. The resulting solution with the best formulation has been measured for the actual production line, and the results demonstrate that the obtained cleaning solution can effectively and efficiently remove BTA, CuO and abrasive SiO2 without basically causing interfacial corrosion. This work demonstrates the possibility of developing a simple, low-cost and environmentally-friendly cleaning solution to effectively solve the issues of BTA removal on post-Cu CMP cleaning in a multi-layered copper wafer. Project supported by the Major National Science and Technology Special Projects (No. 2009ZX02308).

  2. Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    The Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (Y/ER-301) was prepared (1) to safely, cost-effectively, and efficiently evaluate the environmental impact of solid material in the two debris areas in the context of industrial land uses (as defined in the Bear Creek Valley Feasibility Study) to support the Engineering Evaluation/Cost Assessment and (2) to evaluate, define, and implement the actions to mitigate these impacts. This work was performed under Work Breakdown Structure 1.x.01.20.01.08

  3. Biochemical Removal of HAP Precursors From Coal

    Energy Technology Data Exchange (ETDEWEB)

    Olson, G.; Tucker, L.; Richards, J.

    1997-07-01

    This project addresses DOE`s interest in advanced concepts for controlling emissions of air toxics from coal-fired utility boilers. We are determining the feasibility of developing a biochemical process for the precombustion removal of substantial percentages of 13 inorganic hazardous air pollutant (HAP) precursors from coal. These HAP precursors are Sb, As, Be, Cd, Cr, Cl, Co, F, Pb, Hg, Mn, Ni, and Se. Although rapid physical coal cleaning is done routinely in preparation plants, biochemical processes for removal of HAP precursors from coal potentially offer advantages of deeper cleaning, more specificity, and less coal loss. Compared to chemical processes for coal cleaning, biochemical processes potentially offer lower costs and milder process conditions. Pyrite oxidizing bacteria, most notably Thiobacillusferrooxidans, are being evaluated in this project for their ability to remove HAP precursors from U.S. coals.

  4. Biochemical Removal of HAP Precursors From Coal

    International Nuclear Information System (INIS)

    Olson, G.; Tucker, L.; Richards, J.

    1997-07-01

    This project addresses DOE's interest in advanced concepts for controlling emissions of air toxics from coal-fired utility boilers. We are determining the feasibility of developing a biochemical process for the precombustion removal of substantial percentages of 13 inorganic hazardous air pollutant (HAP) precursors from coal. These HAP precursors are Sb, As, Be, Cd, Cr, Cl, Co, F, Pb, Hg, Mn, Ni, and Se. Although rapid physical coal cleaning is done routinely in preparation plants, biochemical processes for removal of HAP precursors from coal potentially offer advantages of deeper cleaning, more specificity, and less coal loss. Compared to chemical processes for coal cleaning, biochemical processes potentially offer lower costs and milder process conditions. Pyrite oxidizing bacteria, most notably Thiobacillusferrooxidans, are being evaluated in this project for their ability to remove HAP precursors from U.S. coals

  5. Sulphur removal in IGCC projects

    Energy Technology Data Exchange (ETDEWEB)

    Cross, F. (Parsons (United Kingdom))

    1998-01-01

    The technology for recovering elemental sulphur from H[sub 2]S bearing gases is well established. The modified Claus Process is the principal work-horse in sulphur recovery and can customarily achieve conversion efficiencies of 95% or better. Nowadays, such a level of recovery is no longer sufficient in most instances and sulphur recovery facility must then include some form of enhanced recovery, usually by treating the Claus tail gas. A number of processes have been introduced to enable the overall recovery to be increased. Recoveries in excess of 99% are both feasible and economic. Use of oxygen in place has become very popular in cases where oxygen is available cheaply or where capacity increases are designed. Most IGCC projects needing an air separation plant would automatically benefit from extending the use of oxygen to the sulphur recovery plant. The most popular route to minimising sulphur emissions in the context of IGCC projects has involved an oxygen based Claus plant followed by tail gas hydrogenation, hydrogen sulphide recovery and its recycle to the Claus section. The recovery of H[sub 2]S from the Claus tail gas can be integrated with the main gas treating system in the gasification plant. The cost advantage of doing so is significant. Parsons has been involved with the technology since 1949 and has been responsible for developments such as the ammonia burning Claus and jointly with Unocal, the BSRP tail gas process and Selectox processes. Recent innovations in response changing environmental and production requirements have included catalytic and tail gas processes which reduce sulphur emissions. 6 figs., 2 tabs.

  6. Sulphur removal in IGCC projects

    Energy Technology Data Exchange (ETDEWEB)

    Cross, F. [Parsons (United Kingdom)

    1998-12-31

    The technology for recovering elemental sulphur from H{sub 2}S bearing gases is well established. The modified Claus Process is the principal work-horse in sulphur recovery and can customarily achieve conversion efficiencies of 95% or better. Nowadays, such a level of recovery is no longer sufficient in most instances and sulphur recovery facility must then include some form of enhanced recovery, usually by treating the Claus tail gas. A number of processes have been introduced to enable the overall recovery to be increased. Recoveries in excess of 99% are both feasible and economic. Use of oxygen in place has become very popular in cases where oxygen is available cheaply or where capacity increases are designed. Most IGCC projects needing an air separation plant would automatically benefit from extending the use of oxygen to the sulphur recovery plant. The most popular route to minimising sulphur emissions in the context of IGCC projects has involved an oxygen based Claus plant followed by tail gas hydrogenation, hydrogen sulphide recovery and its recycle to the Claus section. The recovery of H{sub 2}S from the Claus tail gas can be integrated with the main gas treating system in the gasification plant. The cost advantage of doing so is significant. Parsons has been involved with the technology since 1949 and has been responsible for developments such as the ammonia burning Claus and jointly with Unocal, the BSRP tail gas process and Selectox processes. Recent innovations in response changing environmental and production requirements have included catalytic and tail gas processes which reduce sulphur emissions. 6 figs., 2 tabs.

  7. 241-AZ-101 pump removal trough analysis

    International Nuclear Information System (INIS)

    Coverdell, B.L.

    1995-01-01

    As part of the current Hanford mission of environmental cleanup, various long length equipment must be removed from highly radioactive waste tanks. The removal of equipment will utilize portions of the Equipment Removal System for Project W320 (ERS-W320), specifically the 50 ton hydraulic trailer system. Because the ERS-W320 system was designed to accommodate much heavier equipment it is adequate to support the dead weight of the trough, carriage and related equipment for 241AZ101 pump removal project. However, the ERS-W320 components when combined with the trough and its' related components must also be analyzed for overturning due to wind loads. Two troughs were designed, one for the 20 in. diameter carriage and one for the 36 in. diameter carriage. A proposed 52 in. trough was not designed and, therefore is not included in this document. In order to fit in the ERS-W320 strongback the troughs were design with the same widths. Structurally, the only difference between the two troughs is that more material was removed from the stiffener plates on the 36 in trough. The reduction in stiffener plate material reduces the allowable load. Therefore, only the 36 in. trough was analyzed

  8. NF ISO 14064-2. Greenhouse gases. Part 2: specifications and guidance at the project level for quantification, monitoring and reporting of greenhouse gas emission reductions or removal enhancements

    International Nuclear Information System (INIS)

    2005-01-01

    This document describes methodology for quantification, monitoring and reporting of activities intended to cause greenhouse gas emissions and reductions at projects level (activity modifying the conditions identified in a baseline scenario, intended to reduce emissions or to increase the removal of greenhouse gases). Thus it suggests a method for the declarations of inventory of projects greenhouse gases and provides support for the monitoring and the management of emissions. It provides terms and definitions, principles, the introduction to greenhouse gases projects and the requirements for greenhouse gas projects. (A.L.B.)

  9. Arsenic Removal from Drinking Water by Point of Entry/Point of Use Adsorptive Media U.S. EPA Demonstration Project at Oregon Institute of Technology at Klamath Falls, OR - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the arsenic removal treatment technology demonstration project at Oregon Institute of Technology (OIT) at Klamath Falls, OR. The objectives of the project were to evaluate: (1) the effectiveness...

  10. Arsenic and Uranium Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Upper Bodfish in Lake Isabella, CA -Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the performance evaluation of an arsenic (As) and uranium (U) removal technology demonstrated at Upper Bodfish in Lake Isabella, CA. The objectives of the project are to evaluate: (1) the effecti...

  11. Preliminary engineering report waste area grouping 5, Old Hydrofracture Facility Tanks content removal project, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-06-01

    The Superfund Amendments and Reauthorization Act of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires a Federal Facilities Agreement (FFA) for federal facilities placed on the National Priorities List. The Oak Ridge Reservation was placed on that list on December 21, 1989, and the agreement was signed in November 1991 by the U.S. Department of Energy (DOE) Oak Ridge Operations Office, the U.S. Environmental Protection Agency (EPA) Region IV, and the Tennessee Department of Environment and Conservation (TDEC). The effective date of the FFA is January 1, 1992. One objective of the FFA is to ensure that liquid low-level waste (LLLW) tanks that are removed from service are evaluated and remediated through the CERCLA process. Five inactive LLLW tanks, designated T-1, T-2, T-3, T-4, and T-9, located at the Old Hydrofracture (OHF) Facility in the Melton Valley area of Oak Ridge National Laboratory (ORNL) have been evaluated and are now entering the remediation phase. As a precursor to final remediation, this project will remove the current liquid and sludge contents of each of the five tanks (System Requirements Document, Appendix A). It was concluded in the Engineering Evaluation/Cost Analysis [EE/CA] for the Old Hydrofracture Facility Tanks (DOE 1996) that sluicing and pumping the contaminated liquid and sludge from the five OHF tanks was the preferred removal action. Evaluation indicated that this alternative meets the removal action objective and can be effective, implementable, and cost-effective. Sluicing and removing the tank contents was selected because this action uses (1) applicable experience, (2) the latest information about technologies and techniques for removing the wastes from the tanks, and (3) activities that are currently acceptable for storage of transuranic (TRU) mixed waste

  12. Reactor vessel decommissioning project. Final report

    International Nuclear Information System (INIS)

    Schoonen, D.H.

    1984-09-01

    This report describes a reactor vessel decommissioning project; it documents and explains the project objectives, scope, performance results, and sodium removal process. The project was successfully completed in FY-1983, within budget and without significant problems or adverse impact on the environment. Waste generated by the operation included the reactor vessel, drained sodium, and liquid, solid, and gaseous wastes which were significantly less than project estimates. Personnel radiation exposures were minimized, such that the project total was one-half the predicted exposure level. Except for the sodium removed, the material remaining in the reactor vessel is essentially the same as when the vessel arrived for processing

  13. Project management plan for Waste Area Grouping 5 Old Hydrofracture Facility tanks contents removal at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-06-01

    On January 1, 1992, the US Department of Energy (DOE), the US Environmental Protection Agency (EPA) Region IV, and the Tennessee Department of Environment and Conservation (TDEC) signed a Federal Facility Agreement (FFA) concerning the Oak Ridge Reservation. The FFA requires that inactive liquid low-level (radioactive) waste (LLLW) tanks at Oak Ridge National Laboratory (ORNL) be remediated in accordance with requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This revision is to update the schedule and designation of responsibilities for the Old Hydrofracture Facility (OHF) tanks contents removal project. The scope of this project is to transfer inventory from the five inactive LLLW tanks at the OHF into the active LLLW system

  14. Overstory removal: stand factors related to success and failure

    Science.gov (United States)

    Robert J. Laacke; Gary O. Fiddler

    1986-01-01

    Overstory removal can offer economic and esthetic advantages over clearcutting and regeneration, but projecting success is difficult. Twenty-nine units on nine operational overstory removal cuts in northern California were studied to determine what factors are related to satisfactory or unsatisfactory stocking after harvest. Stocking determinations were based on number...

  15. Effective bias removal for fringe projection profilometry using the dual-tree complex wavelet transform.

    Science.gov (United States)

    Ng, William Wai-Lam; Lun, Daniel Pak-Kong

    2012-08-20

    When reconstructing the three-dimensional (3D) object height profile using the fringe projection profilometry (FPP) technique, the light intensity reflected from the object surface can yield abruptly changing bias in the captured fringe image, which leads to severe reconstruction error. The traditional approach tries to remove the bias by suppressing the zero spectrum of the fringe image. It is based on the assumption that the aliasing between the frequency spectrum of the bias, which is around the zero frequency, and the frequency spectrum of the fringe is negligible. This, however, is not the case in practice. In this paper, we propose a novel (to our knowledge) technique to eliminate the bias in the fringe image using the dual-tree complex wavelet transform (DT-CWT). The new approach successfully identifies the features of bias, fringe, and noise in the DT-CWT domain, which allows the bias to be effectively extracted from a noisy fringe image. Experimental results show that the proposed algorithm is superior to the traditional methods and facilitates accurate reconstruction of objects' 3D models.

  16. Effects of slash removal in an experimental nitrogen gradient. Final report for the project

    International Nuclear Information System (INIS)

    Nohrstedt, H.Oe.; Ring, Eva; Sikstroem, Ulf; Hoegbom, Lars; Nordlund, Sten

    2000-04-01

    During four years after clear-felling, the effects of slash removal, including needles, were studied on a productive spruce site (site index G30) in the province of Vaermland, western Sweden. The study was made in an old fertilization experiment, in which at the most 2400 kg N/ha had been added during a twenty-year period. Despite the fact that the site is rich in nitrogen and that much slash was removed (100 ton d. m./ha), there were only very minor effects of the slash removal on the variables under study. These were the composition of soil water, the content of inorganic nitrogen in soil, the biomass of the field layer and the development of the planted spruce seedlings. The only statistically significant effect was that the content of nitrate was reduced in the humus layer. No data supported the idea that the previous fertilization influenced the effect of the slash removal, even though the fertilization had increased the content of total nitrogen in soil and the nitrogen leaching. Thus, we have not been able to repeat the observation from another Swedish study that slash removal reduces leaching of nitrogen and accompanying base cations, e. g. potassium. The effect of slash removal seems to depend on site conditions. Research is needed to reveal the variation in response and decisive factors. Our results, that the survival of spruce seedlings tends to be favoured by slash removal and that the early height growth is unaffected, are in accordance with results from previous studies. Our result, that the biomass of the total field layer is unaffected by slash removal, is not possible to compare with results from other studies, since these were mainly of a qualitative nature

  17. 324 Building spent fuel segments pieces and fragments removal summary report

    Energy Technology Data Exchange (ETDEWEB)

    SMITH, C L

    2003-01-09

    As part of the 324 Building Deactivation Project, all Spent Nuclear Fuel (SNF) and Special Nuclear Material were removed. The removal entailed packaging the material into a GNS-12 cask and shipping it to the Central Waste Complex (CWC).

  18. Arsenic and Antimony Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at South Truckee Meadows General Improvement District (STMGID), NV, Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the operation of an arsenic and antimony removal technology demonstrated at the South Truckee Meadows General Improvement District (STMGID) in Washoe County, NV. The objectives of the project wer...

  19. 324 Building Compliance Project: Selection and evaluation of alternatives for the removal of solid remote-handled mixed wastes from the 324 Building

    International Nuclear Information System (INIS)

    Ross, W.A.; Bierschbach, M.C.; Dukelow, J.S. Jr.

    1995-06-01

    Six alternatives for the interim storage of remote-handled mixed wastes from the 324 Building on the Hanford Site have been identified and evaluated. The alternatives focus on the interim storage facility and include use of existing facilities in the 200 Area, the construction of new facilities, and the vitrification of the wastes within the 324 Building to remove the majority of the wastes from under RCRA regulations. The six alternatives are summarized in Table S.1, which identifies the primary facilities to be utilized, the anticipated schedule for removal of the wastes, the costs of the transfer from 324 Building to the interim storage facility (including any capital costs), and an initial risk comparison of the alternatives. A recently negotiated Tri-Party Agreement (TPA) change requires the last of the mixed wastes to be removed by May 1999. The ability to use an existing facility reduces the costs since it eliminates the need for new capital construction. The basic regulatory approvals for the storage of mixed wastes are in place for the PUREX facility, but the Form HI permit will need some minor modifications since the 324 Building wastes have some additional characteristic waste codes and the current permit limits storage of wastes to those from the facility itself. Regulatory reviews have indicated that it will be best to use the tunnels to store the wastes. The PUREX alternatives will only provide storage for about 65% of the wastes. This results from the current schedule of the B-Cell Clean Out Project, which projects that dispersible debris will continue to be collected in small quantities until the year 2000. The remaining fraction of the wastes will then be stored in another facility. Central Waste Complex (CWC) is currently proposed for that residual waste storage; however, other options may also be available

  20. Costs of Arsenic Removal Technologies for Small Water Systems: U.S. EPA Arsenic Removal Technology Demonstration Program

    Science.gov (United States)

    As part of the Arsenic Rule Implementation Research Program, between July 2003 and July 2011, the U.S. environmental Protection Agency (EPA) conducted 50 full-scale demonstration projects on treatment systems removing arsenic from drinking water in 26 states throughout the U.S. ...

  1. Cold test plan for the Old Hydrofracture Facility tank contents removal project, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-11-01

    This Old Hydrofracture Facility (OHF) Tanks Contents Removal Project Cold Test Plan describes the activities to be conducted during the cold test of the OHF sluicing and pumping system at the Tank Technology Cold Test Facility (TTCTF). The TTCTF is located at the Robotics and Process Systems Complex at the Oak Ridge National Laboratory (ORNL). The cold test will demonstrate performance of the pumping and sluicing system, fine-tune operating instructions, and train the personnel in the actual work to be performed. After completion of the cold test a Technical Memorandum will be prepared documenting completion of the cold test, and the equipment will be relocated to the OHF site

  2. Radioactive Air Emissions Notice of Construction (NOC) for the Fuel Removal Project

    International Nuclear Information System (INIS)

    JOHNSON, R.E.

    2000-01-01

    This NOC describes the activities to remove all spent nuclear fuel (SNF) assemblies from the spent fuel pool in the T Plant Complex 221-T canyon for interim storage in the Canister Storage Building (CSB). The unabated total effective dose equivalent (TEDE) estimated for the public hypothetical maximally exposed individual (MEI) is 5.7 E-6 millirem (mrem) per year for this fuel removal NOC. The abated TEDE conservatively is estimated to account for 2.9 E-9 mrem per year to the MEI

  3. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  4. Protection of Human Beings Trafficked for the Purpose of Organ Removal: Recommendations

    OpenAIRE

    Pascalev, Assya; Van Assche, Kristof; S?ndor, Judit; Codreanu, Natalia; Naqvi, Anwar; Gunnarson, Martin; Frunza, Mihaela; Yankov, Jordan

    2016-01-01

    Abstract This report presents a comprehensive set of recommendations for protection of human beings who are trafficked for the purpose of organ removal or are targeted for such trafficking. Developed by an interdisciplinary group of international experts under the auspices of the project Trafficking in Human Beings for the Purpose of Organ Removal (also known as the HOTT project), these recommendations are grounded in the view that an individual who parts with an organ for money within an ill...

  5. Removal of radionuclides from household water

    International Nuclear Information System (INIS)

    Vesterbacka, P.; Turtiainen, T.; Haemaelaeinen, K.; Salonen, L.; Arvela, H.

    2007-02-01

    Research upon methods for removing radionuclides from household water was initiated in Finland in 1995. Three research projects, of which two were carried out with National Technology Agency of Finland and one with CEC, have been completed by the end of 2002. One of the main objectives of the research was to compose a guidebook for consumers and water treatment companies. Radon can be removed from household water by aeration and by activated carbon filtration. Aerators that are well designed and set up can remove over 90% of waterborne radon. The best aerators have achieved removal efficiencies that are nearly 100%. However, setting up an aeration system requires thorough planning. Also, activated carbon filtration removes radon efficiently. The removal efficiencies have been over 90%, often nearly 100%. Depending on the water quality and usage, the carbon batch inside the filter needs to be changed every 2 - 3 years. Since activated carbon filters emit gamma radiation while in use, they should not be installed inside the dwelling but in a separate building or by the well. It is recommended that uranium be removed from drinking water by anion exchange, which is the most efficient removal method for this purpose. Typically, the removal efficiencies are nearly 100%. The one exception is the so called tap filter, the removal efficiency of which depends on uranium concentration in raw water and the rate of water flow. High saline concentration in water may extricate uranium from ion exchange resin. Changes in plumbing pressure or pH-value do not have any significant influence in uranium retention. Removal efficiencies of lead and polonium vary a lot depending on the chemical form in which they occur in water. They can be reliably removed from water by reverse osmosis only. Other treatment methods, such as ion exchange and activated carbon filtration, remove lead and polonium partly. Lead and polonium are removed more efficiently when they are bound onto smaller

  6. Trace-level mercury removal from surface water

    International Nuclear Information System (INIS)

    Klasson, K.T.; Bostick, D.T.

    1998-01-01

    Many sorbents have been developed for the removal of mercury and heavy metals from waters; however, most of the data published thus far do not address the removal of mercury to the target levels represented in this project. The application to which these sorbents are targeted for use is the removal of mercury from microgram-per-liter levels to low nanogram-per-liter levels. Sorbents with thiouronium, thiol, amine, sulfur, and proprietary functional groups were selected for these studies. Mercury was successfully removed from surface water via adsorption onto Ionac SR-4 and Mersorb resins to levels below the target goal of 12 ng/L in batch studies. A thiol-based resin performed the best, indicating that over 200,000 volumes of water could be treated with one volume of resin. The cost of the resin is approximately $0.24 per 1,000 gal of water

  7. Position paper -- Waste storage tank heat removal

    International Nuclear Information System (INIS)

    Stine, M.D.

    1995-01-01

    The purpose of this paper is to develop and document a position on the heat removal system to be used on the waste storage tanks currently being designed for the Multi-Function Waste Tank Facility (MWTF), project W-236A. The current preliminary design for the waste storage primary tank heat removal system consists of the following subsystems: (1) a once-through dome space ventilation system; (2) a recirculation dome space ventilation system; and (3) an annulus ventilation system. Recently completed and ongoing studies have evaluated alternative heat removal systems in an attempt to reduce system costs and to optimize heat removal capabilities. In addition, a thermal/heat transfer analysis is being performed that will provide assurance that the heat removal systems selected will be capable of removing the total primary tank design heat load of 1.25 MBtu/hr at an allowable operating temperature of 190 F. Although 200 F is the design temperature limit, 190 F has been selected as the maximum allowable operating temperature limit based on instrumentation sensitivity, instrumentation location sensitivity, and other factors. Seven options are discussed and recommendations are made

  8. Capital and Operating Costs of Small Arsenic Removal Adsorptive Media Systems

    Science.gov (United States)

    The U.S. Environmental Protection Agency (EPA) conducted 50 full-scale demonstration projects on treatment systems removing arsenic from drinking water in 26 states throughout the U.S. The projects were conducted to evaluate the performance, reliability, and cost of arsenic remo...

  9. Correcting length-frequency distributions for imperfect detection

    Science.gov (United States)

    Breton, André R.; Hawkins, John A.; Winkelman, Dana L.

    2013-01-01

    Sampling gear selects for specific sizes of fish, which may bias length-frequency distributions that are commonly used to assess population size structure, recruitment patterns, growth, and survival. To properly correct for sampling biases caused by gear and other sources, length-frequency distributions need to be corrected for imperfect detection. We describe a method for adjusting length-frequency distributions when capture and recapture probabilities are a function of fish length, temporal variation, and capture history. The method is applied to a study involving the removal of Smallmouth Bass Micropterus dolomieu by boat electrofishing from a 38.6-km reach on the Yampa River, Colorado. Smallmouth Bass longer than 100 mm were marked and released alive from 2005 to 2010 on one or more electrofishing passes and removed on all other passes from the population. Using the Huggins mark–recapture model, we detected a significant effect of fish total length, previous capture history (behavior), year, pass, year×behavior, and year×pass on capture and recapture probabilities. We demonstrate how to partition the Huggins estimate of abundance into length frequencies to correct for these effects. Uncorrected length frequencies of fish removed from Little Yampa Canyon were negatively biased in every year by as much as 88% relative to mark–recapture estimates for the smallest length-class in our analysis (100–110 mm). Bias declined but remained high even for adult length-classes (≥200 mm). The pattern of bias across length-classes was variable across years. The percentage of unadjusted counts that were below the lower 95% confidence interval from our adjusted length-frequency estimates were 95, 89, 84, 78, 81, and 92% from 2005 to 2010, respectively. Length-frequency distributions are widely used in fisheries science and management. Our simple method for correcting length-frequency estimates for imperfect detection could be widely applied when mark–recapture data

  10. Removal of phenol from water : a comparison of energization methods

    NARCIS (Netherlands)

    Grabowski, L.R.; Veldhuizen, van E.M.; Rutgers, W.R.

    2005-01-01

    Direct electrical energization methods for removal of persistent substances from water are under investigation in the framework of the ytriD-project. The emphasis of the first stage of the project is the energy efficiency. A comparison is made between a batch reactor with a thin layer of water and

  11. Removal action work plan for the YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    The US Department of Energy is conducting environmental restoration activities at the Y-12 Plant in Oak Ridge, Tennessee. As part of these efforts, a removal action is planned for the former YS-860 Firing Ranges as described in the Action Memorandum for the project. This removal action work plan (RmAWP) is focused on the former YS-860 Firing Ranges, located outside the primary fenceline at the eastern end of the plant. This RmAWP defines the technical approach, procedures, and requirements for the removal of lead-contaminated soil and site restoration of the former YS-860 Firing Ranges at the Y-12 Plant. This RmAWP describes excavation, verification/confirmatory sampling, and reporting requirements for the project. Lower tier plans associated with the RmAWP, which are submitted as separate stand-alone documents, include a field sampling and analysis plan, a health and safety plan, a quality assurance project plan, a waste management plan, a data management implementation plan, and a best management practices plan. A site evaluation of the YS-86O Firing Ranges conducted in 1996 by Lockheed Martin Energy Systems, Inc., determined that elevated lead levels were present in the Firing Ranges target berm soils. The results of this sampling event form the basis for the removal action recommendation as described in the Action Memorandum for this project. This RmAWP contains a brief history and description of the Former YS-860 Firing Ranges Project, along with the current project schedule and milestones. This RmAWP also provides an overview of the technical requirements of the project, including a summary of the approach for the removal activities. Finally, the RmAWP identifies the regulatory requirements and the appropriate removal action responses to address applicable or relevant and appropriate requirements to achieve the project goals of substantially reducing the risk to human health and the environment

  12. Removal of radionuclides from household water

    International Nuclear Information System (INIS)

    Vesterbacka, P.; Turtiainen, T.; Haemaelaeinen, K.; Salonen, L.; Arvela, H.

    2003-10-01

    Research upon methods for removing radionuclides from household water was initiated in Finland in 1995. Three research projects, of which two were carried out with National Technology Agency of Finland and one with CEC, have been completed by the end of 2002. One of the main objectives of the research was to compose a guidebook for consumers and water treatment companies. Radon can be removed from household water by aeration and by activated carbon filtration. Aerators that are well designed and set up can remove over 90% of waterborne radon. The best aerators have achieved removal efficiencies that are nearly 100%. However, setting up an aeration system requires thorough planning. Also, activated carbon filtration removes radon efficiently. The removal efficiencies have been over 90%, often nearly 100%. Depending on the water quality and usage, the carbon batch inside the filter needs to be changed every 2-3 years. Since activated carbon filters emit gamma radiation while in use, they should not be installed inside the dwelling but in a separate building or by the well. It is recommended that uranium be removed from drinking water by anion exchange, which is the most efficient removal method for this purpose. Typically, the removal efficiencies are nearly 100%. The one exception is the so called tap filter, the removal efficiency of which depends on uranium concentration in raw water and the rate of water flow. High saline concentration in water may extricate uranium from ion exchange resin. Changes in plumbing pressure or pH-value do not have any significant influence in uranium retention. Removal efficiencies of lead and polonium vary a lot depending on the chemical form in which they occur in water. They can be reliably removed from water by reverse osmosis only. Other treatment methods, such as ion exchange and activated carbon filtration, remove lead and polonium partly. Lead and polonium are removed more efficiently when they are bound onto smaller particles

  13. Subspace-based interference removal methods for a multichannel biomagnetic sensor array

    Science.gov (United States)

    Sekihara, Kensuke; Nagarajan, Srikantan S.

    2017-10-01

    Objective. In biomagnetic signal processing, the theory of the signal subspace has been applied to removing interfering magnetic fields, and a representative algorithm is the signal space projection algorithm, in which the signal/interference subspace is defined in the spatial domain as the span of signal/interference-source lead field vectors. This paper extends the notion of this conventional (spatial domain) signal subspace by introducing a new definition of signal subspace in the time domain. Approach. It defines the time-domain signal subspace as the span of row vectors that contain the source time course values. This definition leads to symmetric relationships between the time-domain and the conventional (spatial-domain) signal subspaces. As a review, this article shows that the notion of the time-domain signal subspace provides useful insights over existing interference removal methods from a unified perspective. Main results and significance. Using the time-domain signal subspace, it is possible to interpret a number of interference removal methods as the time domain signal space projection. Such methods include adaptive noise canceling, sensor noise suppression, the common temporal subspace projection, the spatio-temporal signal space separation, and the recently-proposed dual signal subspace projection. Our analysis using the notion of the time domain signal space projection reveals implicit assumptions these methods rely on, and shows that the difference between these methods results only from the manner of deriving the interference subspace. Numerical examples that illustrate the results of our arguments are provided.

  14. Canister Cleaning System Final Design Report - Project A.2.A

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    2000-01-01

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. The Canister Cleaning System (CCS) is part of the Debris Removal Project. The CCS will be installed in the KW Basin and operated during the fuel removal activity. The KW Basin has approximately 3600 canisters that require removal from the basin. The CCS is being designed to ''clean'' empty fuel canisters and lids and package them for disposal to the Environmental Restoration Disposal Facility complex. The system will interface with the KW Basin and be located in the Dummy Elevator Pit

  15. Project WAGR: The UK demonstration project for power reactor decommissioning - removing the core and looking to completion

    International Nuclear Information System (INIS)

    Benest, T. G.

    2003-01-01

    The United Kingdom Atomic Energy Authority (UKAEA) has built and operated a wide range of nuclear facilities since the late 1940's. UKAEA's present mission is to restore the environment of these facilities in a safe and environmentally responsible manner. This restoration includes the decommissioning of a number of redundant research and power reactors, one of which is the Windscale Advanced Gas-cooled Reactor (WAGR). Following shut down, UKAEA decided to continue the prototype function of the reactor into the decommissioning phase to develop dismantling techniques and establish waste routes. The reactor core and pressure vessel are now being dismantled in a programme of 10 campaigns, seven of which have been completed since 1998. It is anticipated that the current programme will be completed by summer 2005. This paper outlines the history of the reactor, the operation of the waste-processing route, the installed dismantling equipment and the successful completion of the first seven campaigns. This earlier work has been described in a number of publications and conferences, so this paper concentrates on recent work to select and develop cutting equipment to dismantle the core support structures and the pressure vessel. The decommissioning of the Windscale Advance Gas-cooled reactor is being undertaken to demonstrate that a power reactor can be decommissioned shortly after shutdown. The removal of the core and pressure vessel has been broken down into a series of 10 campaigns associated with particular core components. The first 7 campaigns have been successfully completed and the 8., is expected to commence in September 2003 17 months earlier than planned. Dismantling methodologies and tools have been developed specifically for each of these campaigns. Full-scale mock-ups have been used to test the tools, train the operators and assess the duration of operations. However, despite successful trials, operational experience has shown that some of these tools have not

  16. Water Recycling removal using temperature-sensitive hydronen

    Energy Technology Data Exchange (ETDEWEB)

    Rana B. Gupta

    2002-10-30

    The overall objective of this project was to study the proposed Water Recycling/Removal Using Temperature-Sensitive Hydrogels. The main element of this technology is the design of a suitable hydrogel that can perform needed water separation for pulp and paper industry. The specific topics studied are to answer following questions: (a) Can water be removed using hydrogel from large molecules such as lignin? (b) Can the rate of separation be made faster? (c) What are the molecular interactions with hydrogel surface? (d) Can a hydrogel be designed for a high ionic strength and high temperature? Summary of the specific results are given.

  17. Analysis of registered CDM projects: potential removal of evidenced bottlenecks

    Energy Technology Data Exchange (ETDEWEB)

    Agosto, D.; Bombard, P.; Gostinelli, F.

    2007-07-01

    The Clean Development Mechanism (CDM) has developed during its first period of implementation, a distinctive set of patterns. The authors thought of concentrating on the CDM analysis in order to highlight potential remedies or reasons for given bottlenecks. In order to establish a sort of extensive SWOT analysis for CDMs, all the 356 projects actually (November 2006) registered at UNFCCC were examined, together with all the about 1000 PDDs presented to the UNFCCC but not registered yet. The CDM projects have been studied trying to cluster projects according to relevant characteristics, both from a technical and an economic point of view. Chosen indicators are meant to identify: more convenient/more diffused energy system for a CDM; reasons for a geographical distribution of different types of projects; potentials for a future exploitation of lower used technologies in CDM. Conclusions are drawn and appropriate tables and graphs presented. (1) the Baseline Emission Factor, combined to economic patterns, is the pivotal factor that characterizes both choices of host country and technology; (2) some technologies can exploit appropriately CDM scheme, whilst other technologies, are constrained by it. (3) there are still some important weak points: grouping of non Annex I countries; crediting period; criteria for the evaluation of sustainable development. (auth)

  18. Integrating removal actions and remedial actions: Soil and debris management at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Goidell, L.C.; Hagen, T.D.; Strimbu, M.J.; Dupuis-Nouille, E.M.; Taylor, A.C.; Weese, T.E.; Yerace, P.J.

    1996-01-01

    Since 1991, excess soil and debris generated at the Fernald Environmental management Project (FEMP) have been managed in accordance with the principles contained in a programmatic Removal Action (RvA) Work Plan (WP). This plan provides a sitewide management concept and implementation strategy for improved storage and management of excess soil and debris over the period required to design and construct improved storage facilities. These management principles, however, are no longer consistent with the directions in approved and draft Records of Decision (RODs) and anticipated in draft RODs other decision documents. A new approach has been taken to foster improved management techniques for soil and debris that can be readily incorporated into remedial design/remedial action plans. Response, Compensation and Liability Act (CERCLA) process. This paper describes the methods that were applied to address the issues associated with keeping the components of the new work plan field implementable and flexible; this is especially important as remedial design is either in its initial stages or has not been started and final remediation options could not be precluded

  19. Removal of natural radionuclides from drinking water from private wells in Finland

    International Nuclear Information System (INIS)

    Huikuri, Pia; Salonen, Laina; Turtiainen, Tuukka

    1999-01-01

    Removal of natural radionuclides is often necessary in Finland when household water is taken from a drilled well. Removal of radionuclides by various methods from Finnish groundwaters were studied in a EU-research project, TENAWA. The results indicated that radon can be removed very efficiently (up to 99%) by applying aeration or granular activated carbon (GAC) filtration. Uranium and radium were also removed (over 94%) by using strong base anion (SBA) and strong acid cation (SAC) resins. The capability of reverse osmosis (RO) equipment to remove radionuclides was over 90% for uranium, radium and polonium. The water quality analyses indicated that water quality remained mostly good during the water treatment. (au)

  20. CPP-603 Chloride Removal System Decontamination and Decommissioning

    International Nuclear Information System (INIS)

    Moser, C.L.

    1993-02-01

    The CPP-603 (annex) Chloride Removal System (CRS) Decontamination and Decommissioning (D ampersand D) Project is described in this report. The CRS was used for removing Chloride ions and other contaminants that were suspended in the waters of the underwater fuel storage basins in the CPP-603 Fuel Receiving and Storage Facility (FRSF) from 1975 to 1981. The Environmental Checklist and related documents, facility characterization, decision analysis', and D ampersand D plans' were prepared in 1991. Physical D ampersand D activities were begun in mid summer of 1992 and were completed by the end of November 1992. All process equipment and electrical equipment were removed from the annex following accepted asbestos and radiological contamination removal practices. The D ampersand D activities were performed in a manner such that no radiological health or safety hazard to the public or to personnel at the Idaho National Engineering Laboratory (INEL) occurred

  1. Research reactor decommissioning experience - concrete removal and disposal -

    International Nuclear Information System (INIS)

    Manning, Mark R.; Gardner, Frederick W.

    1990-01-01

    Removal and disposal of neutron activated concrete from biological shields is the most significant operational task associated with research reactor decommissioning. During the period of 1985 thru 1989 Chem-Nuclear Systems, Inc. was the prime contractor for complete dismantlement and decommissioning of the Northrop TRIGA Mark F, the Virginia Tech Argonaut, and the Michigan State University TRIGA Mark I Reactor Facilities. This paper discusses operational requirements, methods employed, and results of the concrete removal, packaging, transport and disposal operations for these (3) research reactor decommissioning projects. Methods employed for each are compared. Disposal of concrete above and below regulatory release limits for unrestricted use are discussed. This study concludes that activated reactor biological shield concrete can be safely removed and buried under current regulations

  2. Variation in fish community structure, richness, and diversity in 56 Danish lakes with contrasting depth, size, and trophic state: does the method matter?

    DEFF Research Database (Denmark)

    Menezes, Rosemberg; Borchsenius, Finn; Svenning, J.-C.

    2013-01-01

    a better understanding of fish communities. We compare fish community composition, richness, and diversity in 56 Danish lakes using data obtained by gillnetting in different lake zones and near-shore electrofishing, respectively. On average, electrofishing captured more species than offshore gillnets......, but not more than littoral gillnets. Overall, the different fish sampling methods showed consistency as to fish community structure, but noticeable differences in community–environment relationships. Lake area was the best predictor for fish species richness in the littoral samplings, while it was poor...... community, as all methods miss some important species that other methods capture. However, electrofishing seems to be a fast alternative to gillnets for monitoring fish species richness and composition in littoral habitats of Danish lakes....

  3. Coastal change from a massive sediment input: Dam removal, Elwha River, Washington, USA

    Science.gov (United States)

    Warrick, Jonathan A.; Gelfenbaum, Guy R.; Stevens, Andrew; Miller, Ian M.; Kaminsky, George M.; Foley, Melissa M.

    2015-01-01

    The removal of two large dams on the Elwha River, Washington, provides an ideal opportunity to study coastal morphodynamics during increased sediment supply. The dam removal project exposed ~21 million cubic meters (~30 million tonnes) of sediment in the former reservoirs, and this sediment was allowed to erode by natural river processes. Elevated rates of sand and gravel sediment transport in the river occurred during dam removal. Most of the sediment was transported to the coast, and this renewed sediment supply resulted in hundreds of meters of seaward expansion of the river delta since 2011. Our most recent survey in January 2015 revealed that a cumulative ~3.5 million m3 of sediment deposition occurred at the delta since the beginning of the dam removal project, and that aggradation had exceeded 8 m near the river mouth. Some of the newly deposited sediment has been shaped by waves and currents into a series of subaerial berms that appear to move shoreward with time.

  4. Organic dyes removal using magnetically modified rye straw

    Czech Academy of Sciences Publication Activity Database

    Baldíková, E.; Šafaříková, Miroslava; Šafařík, Ivo

    2015-01-01

    Roč. 180, APR 2015 (2015), s. 181-185 ISSN 0304-8853 R&D Projects: GA ČR GA13-13709S Institutional support: RVO:67179843 Keywords : Rye straw * Adsorbent * Dyes removal * Magnetic modification Subject RIV: CC - Organic Chemistry Impact factor: 2.357, year: 2015

  5. Tuberculosis in cattle: the results of the four-area project

    Directory of Open Access Journals (Sweden)

    Griffin John M

    2005-11-01

    Full Text Available The four-area project was undertaken to further assess the impact of badger removal on the control of tuberculosis in cattle herds in Ireland. It was conducted between 1997 and 2002 in matched removal and reference areas in four counties, namely Cork, Donegal, Kilkenny and Monaghan, representing a wide range of Irish farming environments. In the removal areas, a proactive programme of badger removal was conducted, on two or three occasions each year, whereas in the reference areas, badger removal was entirely reactive following severe outbreaks of tuberculosis amongst cattle. A detailed statistical analysis of this study has already been presented by Griffin et al. 13; this paper presents further, mainly descriptive, findings from the study. In total, 2,360 badgers were captured in the removal areas of which 450 (19.5% were considered positive for tuberculosis and 258 badgers were captured in the reference areas, with 57 (26.1% positive for tuberculosis. The annual incidence of confirmed herd restrictions was lower in the removal area compared to the reference area in every year of the study period in each of the four counties. These empirical findings were consistent with the hazard ratios found by Griffin et al. 13. Further, the effect of proactive badger removal on cattle tuberculosis in the four-area project and in the earlier east-Offaly project, as measured using the number of reactors per 1,000 cattle tested, were very similar, providing compelling evidence of the role of badgers in the epidemiology of tuberculosis in Irish cattle herds. The validity of the four-area project was discussed in detail. Efforts to minimise badger-to-cattle transmission in Ireland must be undertaken in association with the current comprehensive control programme, which has effectively minimised opportunities for cattle-to-cattle transmission.

  6. PROJECT-SPECIFIC TYPE A VERIFICATION FOR THE HIGH FLUX BEAM REACTOR UNDERGROUND UTILITIES REMOVAL PHASE 3 TRENCH 1, BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK

    International Nuclear Information System (INIS)

    Harpenau, E.M.

    2010-01-01

    The Oak Ridge Institute for Science and Education (ORISE) has reviewed the project documentation and data for the High Flux Beam Reactor (HFBR) Underground Utilities removal Phase 3; Trench 1 at Brookhaven National Laboratory (BNL) in Upton, New York. The Brookhaven Survey Group (BSG) has completed removal and performed Final Status Survey (FSS) of the 42-inch duct and 14-inch line in Trench 1 from Building 801 to the Stack. Sample results have been submitted as required to demonstrate that the cleanup goal of (le)15 mrem/yr above background to a resident in 50 years has been met. Four rounds of sampling, from pre-excavation to FSS, were performed as specified in the Field Sampling Plan (FSP) (BNL 2010a). It is the policy of the U.S. Department of Energy (DOE) to perform independent verifications of decontamination and decommissioning activities conducted at DOE facilities. ORISE has been designated as the organization responsible for this task for the HFBR Underground Utilities. ORISE, together with DOE, determined that a Type A verification of Trench 1 was appropriate based on recent verification results from Trenches 2, 3, 4, and 5, and the minimal potential for residual radioactivity in the area. The removal of underground utilities has been performed in three stages to decommission the HFBR facility and support structures. Phase 3 of this project included the removal of at least 200 feet of 36-inch to 42-inch duct from the west side to the south side of Building 801, and the 14-inch diameter Acid Waste Line that spanned from 801 to the Stack within Trench 1. Based on the pre-excavation sample results of the soil overburden, the potential for contamination of the soil surrounding the pipe is minimal (BNL 2010a). ORISE reviewed the gamma spectroscopy results for 14 FSS soil samples, four core samples, and one duplicate sample collected from Trench 1. Sample results for the radionuclides of concern were below the established cleanup goals. However, in sample PH-3

  7. Treatment of radioactive laboratory waste for mercury removal

    International Nuclear Information System (INIS)

    Osteen, A.B.; Bibler, J.P.

    1990-01-01

    Routine analyses of Savannah River Laboratory wastes at the Savannah River Site occasionally reveal mercury concentrations in the waste in excess of the 0.200 μg/L RCRA limit. An ion exchange resin has been demonstrated to be effective for the removal of dissolved mercury from laboratory waste in a special permitted project. The ion exchange material is Duolite trademark GT-73, a polystyrene/divinylbenzene resin with thiol functional groups. As a result of the decontamination demonstration, the resin is in use or under consideration for use with several other SRS radwaste streams as a reliable medium for mercury removal

  8. 78 FR 68995 - Safety Zone: Vessel Removal From the Oakland Estuary, Alameda, CA

    Science.gov (United States)

    2013-11-18

    ...-AA00 Safety Zone: Vessel Removal From the Oakland Estuary, Alameda, CA AGENCY: Coast Guard, DHS. ACTION... waters of the Oakland Estuary just north of the Park Street Bridge in Alameda, CA in support of the Oakland Estuary Closure for the Vessel Removal Project on November 4, 2013 through November 22, 2013. This...

  9. Status of sodium removal and component decontamination technology in the SNR programme

    Energy Technology Data Exchange (ETDEWEB)

    Haubold, W [INTERATOM GmbH, Bergisch Gladbach (Germany); Smit, C Ch [MT-TNO Dept. 50-MW Sodium Component Test Facility, Hengelo (Netherlands); Stade, K Ch [Kernkraftwerk-Betriebsgesellschaft mbH, Eggenstein-Leopoldshafen (Germany)

    1978-08-01

    This paper summarizes the experience with sodium removal and component decontamination processes within the framework of the SNR project since the IAEA Specialists Meeting on 'Decontamination of Plant Components from Sodium and Radioactivity' at Dounreay, April 9-12, 1973. The moist nitrogen process has been successfully applied to remove sodium from all 66 fuel elements of the KNK I core. Progress has been obtained in removing sodium from fuel elements and large components by vacuum distillation. Areas where future development is required are identified. (author)

  10. Status of sodium removal and component decontamination technology in the SNR programme

    International Nuclear Information System (INIS)

    Haubold, W.; Smit, C.Ch.; Stade, K.Ch.

    1978-01-01

    This paper summarizes the experience with sodium removal and component decontamination processes within the framework of the SNR project since the IAEA Specialists Meeting on 'Decontamination of Plant Components from Sodium and Radioactivity' at Dounreay, April 9-12, 1973. The moist nitrogen process has been successfully applied to remove sodium from all 66 fuel elements of the KNK I core. Progress has been obtained in removing sodium from fuel elements and large components by vacuum distillation. Areas where future development is required are identified. (author)

  11. FRG sealed isotopic heat sources project (C-229) project management plan

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1997-01-01

    This Project Management Plan defines the cost, scope, schedule, organizational responsibilities, and work breakdown structure for the removal of the Federal Republic of Germany (FRG) Sealed Isotopic Heat Sources from the 324 Building and placed in interim storage at the Central Waste Complex (CWC)

  12. Characterization and quantification of deposits build up and removal in straw suspension fired boilers

    DEFF Research Database (Denmark)

    Jensen, Peter Arendt; Shafique Bashir, Muhammad; Wedel, Stig

    This project deals with ash deposit formation in suspension fired biomass power plant boilers. The project has been conducted in a tight collaboration between Vattenfall and the CHEC Research Centre at DTU Department of Chemical Engineering. A large part of the project has been performed by condu......This project deals with ash deposit formation in suspension fired biomass power plant boilers. The project has been conducted in a tight collaboration between Vattenfall and the CHEC Research Centre at DTU Department of Chemical Engineering. A large part of the project has been performed...... by conducting advanced probe measurements at the Amagerværkets Vattenfall owed boilers. It was the objective of the project to provide an improved understanding of ash deposit formation and removal in biomass suspension fired boilers. The project have provided a large amount of knowledge on the following issues......: 1) The influence of local boiler conditions on deposit formation in suspension fired boilers using wood or co-firing straw and wood, 2) quantification of deposit removal in biomass suspension firing boilers with regards both to natural shedding and soot blower induced shedding, 3) established...

  13. ISU Team Project: An Integral View on Space Debris Mitigation and Removal

    Science.gov (United States)

    Maier, Philipp; Ricote Navarro, Carmon; Jehn, Rudiger; Gini, Andrea; Faure, Pauline; Adriaensen, Maarten; Datta, Iman; Hilbich, Daniel; Jacimovic, Aleksandar; Jacques, Lionel; Penent, Guilhem; Sinn, Thomas; Shioi, Hiroaki

    2013-08-01

    The issue of space debris poses challenges not only in technical, but also legal, political and economic dimensions. A sustainable solution needs to take into account all of them. This paper investigates such a potential solution in a multidisciplinary approach. To this end, it addresses the effectiveness of the existing debris mitigation guidelines, and identifies technical improvements for mitigation. It continues examining technical concepts for debris removal and performing proper cost-benefit trade-offs. The results of new simulations to assess the damage cost caused by space debris are presented. Based on these findings, an organizational framework and political recommendations are developed which will enable a sustainable use of space starting in 2020. The findings are compiled into a roadmap, which outlines 1) a path to the full adherence to debris mitigation guidelines and 2) the removal of ten large pieces of debris per year by a dedicated international organization, including expected expenditures necessary for its implementation.

  14. Air/water exchange of mercury in the Everglades I: the behavior of dissolved gaseous mercury in the Everglades Nutrient Removal Project

    Science.gov (United States)

    Zhang; Lindberg

    2000-10-02

    From 1996 to 1998 we determined dissolved gaseous mercury (DGM) in waters of the Everglades Nutrient Removal Project (ENR), a constructed wetlands. The concentrations of DGM measured in these waters (mean 7.3 +/- 9.5 pg l(-1)) are among the lowest reported in the literature, and suggest a system often near or slightly above equilibrium with Hg in ambient air. DGM exhibited both seasonal and diel trends, peaking at midday and during the summer. A simple box budget model of DGM in waters of the Everglades was developed using an interactive spreadsheet based on a mass balance among light-induced reduction of HgII (production of DGM), Hg0 oxidation (removal), and Hg0 evasion in a box (water column) consisting of a surface region with sunlight available and a lower dark region. The modeling results suggest high sensitivity of hourly DGM concentrations to DGM production rates and initial DGM levels. The sensitivity to Hg oxidation is lower than the sensitivity to DGM production. The model performance demonstrates successful simulations of a variety of DGM trends in the Everglades. In particular, it clearly demonstrates how it is possible to measure comparable rates of evasion over several Everglades sites with different DGM concentrations.

  15. Achievement report on research and development in the Sunshine Project in fiscal 1980. Development of a hydrogen sulfide removing technology; 1980 nendo ryuka suiso jokyo gijutsu no kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    As part of geothermal development promotion program in the Sunshine Project, a hydrogen sulfide removing technology development has been worked on since fiscal 1977 for the purpose of environment preservation and multi-purpose utilization. Hydrogen sulfide in downstream fluid in a turbine is removed by more than 90% (as the target value), and the removed hydrogen sulfide is converted into single sulfur having an added value. For condenser waste gas processing, selection was made in fiscal 1980 on the RET process (sulfur is obtained by removing hydrogen sulfide in a suction column and an oxidation column), and for condensate processing, the stripping process (gas having been sent into a stripping column and stripped is fed into the RET device via demister for processing). Field tests were carried out by using fluid generated in a geothermal power plant. Conclusions were reached at high accuracy on optimal process selection corresponding to conditions of the fluid on the turbine outlet side and on the hydrogen sulfide removing cost. A process to treat fluid on the turbine inlet side is available, but not as economically effective as the downstream fluid processing. Same applies to the chemical processing method. A method to measure continually hydrogen sulfide in geothermal steam has been established. (NEDO)

  16. Removing the Restrictions Imposed on Finite State Machines ...

    African Journals Online (AJOL)

    This study determines an effective method of removing the fixed and finite state amount of memory that restricts finite state machines from carrying out compilation jobs that require larger amount of memory. The study is ... The conclusion reviewed the various steps followed and made projections for further reading. Keyword: ...

  17. Treatment of Berkeley boilers in Studsvik. Project description and experiences - Berkeley Boilers Project

    International Nuclear Information System (INIS)

    Saul, Dave; Davidson, Gavin; Wirendal, Bo

    2014-01-01

    In November 2011 Studsvik was awarded a contract to transport five decommissioned boilers from the Berkeley Nuclear Licensed Site in the UK to the Studsvik Nuclear Site in Sweden for metal treatment and recycling. A key objective of the project was to remove the boilers from the site by 31 March 2012 and this was successfully achieved with all boilers off site by 22 March and delivered to Studsvik on 6 April. In November 2012 Studsvik was awarded a further contract for the remaining ten Berkeley Boilers with the requirement to remove all boilers from the Berkeley site by 31 March 2013. Again this was successfully achieved ahead of programme with all boilers in Sweden by 1 April 2013. A total of nine boilers have now been processed and all remaining boilers will be completed by end of September 2014. The projects have had many challenges including a very tight timescale and both have been successfully delivered to cost and ahead of the baseline programme. This paper describes the project and the experience gained from treatment of the boilers to date. (authors)

  18. Arsenic and Antimony Removal from Drinking Water by Point-of-Entry Reverse Osmosis Coupled with Dual Plumbing Distribution - U.S. EPA Demonstration Project at Carmel Elementary School in Carmel, ME -Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed for and the results obtained from the arsenic and antimony removal treatment technology demonstration project at the Carmel Elementary School (CES) in Carmel, ME. An innovative approach of employing point of entry (POE) reverse osmo...

  19. Acute changes in clinical breast measurements following bra removal: Implications for surgical practice

    Directory of Open Access Journals (Sweden)

    Joanna Scurr

    2015-03-01

    Conclusions: Internipple distance and breast projection can be measured first following bra removal, followed by sternal notch to nipple distance, any measures associated with the vertical nipple position should be made more than 6 min after bra removal. These guidelines have implications for breast surgery, particularly for unilateral reconstruction based on the residual breast position.

  20. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  1. Laboratory simulated slipstream testing of novel sulfur removal processes for gasification application

    International Nuclear Information System (INIS)

    Schmidt, Roland; Tsang, Albert; Cross, Joe; Summers, Clinton; Kornosky, Bob

    2008-01-01

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is investigating an Early Entrance Coproduction Plant (EECP) concept to evaluate integrated electrical power generation and methanol production from coal and other carbonaceous feedstocks. Research, development and testing (RD and T) that is currently being conducted under the project is evaluating cost effective process systems for removing contaminants, particularly sulfur species, from the generated gas which contains mainly synthesis gas (syngas), CO 2 and steam at concentrations acceptable for the methanol synthesis catalyst. The RD and T includes laboratory testing followed by bench-scale and field testing at the SG Solutions Gasification Plant located in West Terre Haute, Indiana. Actual synthesis gas produced by the plant was utilized at system pressure and temperature for bench-scale field testing. ConocoPhillips Company (COP) developed a sulfur removal technology based on a novel, regenerable sorbent - S Zorb trademark - to remove sulfur contaminants from gasoline at high temperatures. The sorbent was evaluated for its sulfur removal performance from the generated syngas especially in the presence of other components such as water and CO 2 which often cause sorbent performance to decline over time. This publication also evaluates the performance of a regenerable activated carbon system developed by Nucon International, Inc. in polishing industrial gas stream by removing sulfur species to parts-per-billion (ppb) levels. (author)

  2. Feasibility of passive heat removal systems

    Energy Technology Data Exchange (ETDEWEB)

    Ashurko, Yu M [Institute of Physics and Power Engineering, Obninsk (Russian Federation)

    1996-12-01

    This paper presents a review of decay heat removal systems (DHRSs) used in liquid metal-cooled fast reactors (LMFRs). Advantages and the disadvantages of these DHRSs, extent of their passivity and prospects for their use in advanced fast reactor projects are analyzed. Methods of extending the limitations on the employment of individual systems, allowing enhancement in their effectiveness as safety systems and assuring their total passivity are described. (author). 10 refs, 10 figs.

  3. Momentum projection and relativistic boost of solitons: Coherent states and projection

    International Nuclear Information System (INIS)

    Luebeck, E.G.; Birse, M.C.; Henley, E.M.; Wilets, L.

    1986-01-01

    We present a method for calculating center-of-mass corrections to hadron properties in soliton models and we apply the method to the soliton bag model. A coherent state is used to provide a quantum wave function corresponding to the mean-field approximation. This state is projected onto a zero-momentum eigenstate. States of nonzero momentum can be constructed from this with a Lorentz boost operator. Hence center-of-mass corrections can be made in a properly relativistic way. The energy of the projected zero-momentum state is the hadron mass with spurious center-of-mass energy removed. We apply a variational principle to our projected state and use three ''virial theorems'' to test our approximate solution. We also study projection of general one-mode states. Projection reduces the nucleon energy by up to 25%. Variation after projection gives a further reduction of less than 20%. Somewhat larger reductions in the energy are found for meson states

  4. Removal of bound metal fasteners

    Science.gov (United States)

    Kramer, R. F.

    1981-04-01

    This project explored the removal of bound metal fasteners through the use of ultrasonically assisted wrenches. Two wrenches were designed, fabricated and tested. Previous studies had indicated an increase in thread tension for a given torque application under the influence of ultrasonics. Based on this, the loosening of seized and corroded fasteners with the aid of ultrasonics was explored. Experimental data confirmed our prior analysis of the torque-tension relationship under the influence of ultrasonics; however, our progress did not satisfy the requirements necessary to loosen seized studs in a shipyard environment.

  5. The removal of plutonium contaminants from Rocky Flats Plant soil

    International Nuclear Information System (INIS)

    Sunderland, N.R.

    1987-01-01

    This research was undertaken to determine if the TRUclean process could effectively remove radioactive elements from soils other than derived coral. This is an interim report prior to the project report and discusses the outcome of the tests of the Rocky Flats Plant (RFP) soil. The soil tested contained plutonium particulates in the micron and submicron range. Volume reduction and activity removal were accomplished with an overall efficiency of greater than 90%. The TRUclean process is a very practical and economical solution to soil contamination problems at the Rocky Flats Plant

  6. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA AT GOFFSTOWN, NH SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Orchard Highlands Subdivision site at Goffstown, NH. The objectives of the project are to evaluate the effect...

  7. Dynamics of epiretinal membrane removal off the retinal surface: a computer simulation project.

    Science.gov (United States)

    Dogramaci, Mahmut; Williamson, Tom H

    2013-09-01

    To use a computer simulation to discern the safest angle at which to peel epiretinal membranes. We used ANSYS V.14.1 software to analyse the dynamics involved in membrane removal off the retinal surface. The geometrical values were taken from optical coherence tomography of 30 eyes with epiretinal membranes. A range of Young's modulus values of 0.03, 0.01 and 0.09 MPa were assigned to the epiretinal membrane and to the retina separately. The ratio of maximum shear stress (MSS) recorded at the attachment pegs over that recorded at the membrane (P/E ratio) was determined at nine displacement angles (DA). Mean MSS values recorded at the attachment pegs, epiretinal membrane and retina were significantly different at 0.8668, 0.6091 and 0.0017 Pa consecutively (p<0.05). There was a significant negative linear correlation between DA and MSS recorded at the epiretinal membrane when the Young's modulus for the epiretinal membrane was higher than or equal to that for the attachment pegs and the retina. Nevertheless, there was a significant positive linear correlation between DA and P/E ratio when the Young's modulus for the epiretinal membrane was equal to or lower than that for the attachment pegs and the retina. Attachment pegs appear to be the most likely part to fail (tear) during removal procedures. Changing the direction at which the edge of the membrane is pulled can relocate the MSS within in the tissue complex. Safer and effective removal could be achieved by pulling epiretinal membranes onto themselves at 165° DA.

  8. Fishes from Lake Yaxhá, Mayan Biosphere Reserve, Petén, Guatemala

    OpenAIRE

    Barrientos, Christian; Elías, Diego; Quintana, Yasmín

    2015-01-01

    The Mayan Biosphere Reserve is the largest protected area in Guatemala. Lake Yaxhá is located inside the core zone. Using electrofishing, seines and gillnets we assessed the fish richness and community in 2011. We collected 18 species distributed in seven families, with Cichlidae (seven species) and Poecilidae (five species) the most specious. We evaluated the effectiveness of electrofishing to sample the most important fish in the artisanal fishery in Petén, Petenia splendida, with September...

  9. Decommissioning project management unit started its activities

    International Nuclear Information System (INIS)

    Medeliene, D.

    2002-01-01

    The Decommissioning Project Management Unit team comprises western experts as well as experts from INPP Decommissioning Service who all work as a single team. The DPMU will develop the Final Decommissioning Plan and a more detailed Decommissioning Project, which will describe how the plant will be removed from service and safely decommissioned

  10. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  11. Near-Zero Emissions Oxy-Combustion Flue Gas Purification Task 2: SOx/Nox/Hg Removal for High Sulfur Coal

    Energy Technology Data Exchange (ETDEWEB)

    Nick Degenstein; Minish Shah; Doughlas Louie

    2012-05-01

    The goal of this project is to develop a near-zero emissions flue gas purification technology for existing PC (pulverized coal) power plants that are retrofitted with oxy-combustion technology. The objective of Task 2 of this project was to evaluate an alternative method of SOx, NOx and Hg removal from flue gas produced by burning high sulfur coal in oxy-combustion power plants. The goal of the program was not only to investigate a new method of flue gas purification but also to produce useful acid byproduct streams as an alternative to using a traditional FGD and SCR for flue gas processing. During the project two main constraints were identified that limit the ability of the process to achieve project goals. 1) Due to boiler island corrosion issues >60% of the sulfur must be removed in the boiler island with the use of an FGD. 2) A suitable method could not be found to remove NOx from the concentrated sulfuric acid product, which limits sale-ability of the acid, as well as the NOx removal efficiency of the process. Given the complexity and safety issues inherent in the cycle it is concluded that the acid product would not be directly saleable and, in this case, other flue gas purification schemes are better suited for SOx/NOx/Hg control when burning high sulfur coal, e.g. this project's Task 3 process or a traditional FGD and SCR.

  12. Fluoride Removal from Water by Reverse Osmosis Membrane

    Directory of Open Access Journals (Sweden)

    Sara Namavar

    2013-09-01

    Full Text Available As fluoride concentration in drinking water is one of the effective parameters in human health, finding the way to remove excess amount of fluoride from drinking water is very important in water supply projects. Today, with developing in technology and finding new methods, the use of membrane technology for producing fresh water get improved. In this study the efficiency of reverse osmosis method to remove fluoride from water was investigated. Initial concentration of fluoride, sulfate and electrical conductivity in feed water and the effect of associated cation with fluoride ion were studied. All tests adapted from “Standard Methods for Examination of Water and Wastewater”. Determination of fluoride concentration was done according the standard SPANDS method by using a spectrophotometer DR/5000. Obtain results show that with increasing in concentration of fluoride and sulfate and electrical conductivity in feed water the efficiency of RO membrane to remove fluoride reduced. In addition, this efficiency for CaF2 was higher than NaF.

  13. Bull trout life history, genetics, habitat needs, and limiting factors in central and northeast Oregon, Annual Report 1995

    International Nuclear Information System (INIS)

    Hemmingsen, A.R.; Buchanan, D.V.; Howell, P.J.

    1996-03-01

    To fulfill one objective of the present study, genetic characteristics of Oregon bull trout will be determined by analysis of mitochondrial and nuclear DNA. During 1995, the authors collected and sampled a total of 1,217 bull trout from 46 streams in the Columbia River Basin. DNA analysis of those samples will be conducted at University of Montana. They primarily sampled juvenile fish near natal areas to increase the likelihood of identifying discrete populations while minimizing risk of injury to large spawners. Fork lengths of all fish sampled ranged from 2.6 to 60.5 cm with a median of 12 cm. Eighty-four percent of all bull trout sampled were less than 19 cm while two percent were larger than 27 cm. Bull trout were collected by several methods, mostly by electrofishing. Eighty-six percent of all bull trout sampled were collected by electrofishing with a programmable waveform electrofisher. They observed injuries caused by electrofishing to 8% of that proportion. Based on preliminary analysis, no waveform combination used appeared less injurious than others. Highest voltages appeared less injurious than some that were lower. Frequency of electrofishing injury was significantly correlated to fork length over the range-from 4 to 26 cm. There were indications for substantial risk for such injury to bull trout larger than 26 cm. Other species found in association with bull trout included chinook salmon Oncorhynchus tshawytscha, mountain whitefish Prosopium williamsoni, rainbow trout Oncorhynchus mykiss, sculpins Cottus spp., cutthroat trout Oncorhynchus clarki, non-native brook trout Salvelinus fontinalis, and tailed frogs Ascaphus truei. Rainbow trout was the species most frequently associated with bull trout. No injury or mortality was observed for any of the associated species captured

  14. Mixing and In situ product removal in micro-bioreactors

    NARCIS (Netherlands)

    Li, X.

    2009-01-01

    Summary Of the thesis :’ Mixing and In-situ product removal in micro bioreactors’ by Xiaonan Li The work presented in this thesis is a part of a large cluster project, which was formed between DSM, Organon, Applikon and two university groups (TU Delft and University of Twente), under the ACTS and

  15. Dismantling and removal of the Niederaichbach nuclear power plant (KKN) to the 'Green Field'. Final report

    International Nuclear Information System (INIS)

    Valencia, L.; Prechtl, E.

    1998-04-01

    The major objective of the present project consisted in the complete dismantling and removal of the Niederaichbach nuclear power plant (KKN), ranging from the state of safe enclosure to re-establishing the original state of vegetation of the site (so-called 'green field'). By reaching this objective, principle feasibility of the complete removal of a power reactor was demonstrated. In addition, considerable experience has been gained with regard to the execution of all phases of such a complex project and project optimization. The following phases of the project can be distinguished: - Licensing procedure - dismantling of the inactive, contaminated and activated plant sections - disassembly of the activated building structures and decontamination of the buildings - demolition (conventional) of the buildings and recultivation of the site. Moreover, the project included the work performed under the direct supervision of the licensing authority, comprehensive radiation protection activities, the solution of waste management problems and the respective public relations work. (orig./MM) [de

  16. Field grouting summary report on the WAG seeps 4 and 6 removal action project, Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 1: Text

    International Nuclear Information System (INIS)

    1997-05-01

    During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot program was performed inside portions of four unlined waste disposal trenches at Waste Area Grouping (WAG) 4 at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The project was deemed a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); however, due to a history of heavy precipitation in the fall, the schedule was fast-tracked to meet an October 31, 1996 grouting completion date. The technical objective of the removal action was to reduce the off-site transport of Strontium 90 ( 90 Sr) by grouting portions of four waste disposal trenches believed to be responsible for over 70% of the 90 Sr leaving the site. A goal of the grouting operation was to reduce the average in situ hydraulic conductivity of the grouted waste materials to a value equal to or less than 1 x 10 -6 cm/sec. This target hydraulic conductivity value was established to be at least two orders of magnitude lower than that of the surrounding natural ground

  17. Status of the RA research reactor decommissioning project

    International Nuclear Information System (INIS)

    Ljubenov, V.; Nikolic, D.; Pesic, M.; Milosevic, M.; Kostic, Lj.; Steljic, M.; Sotic, O.; Antic, D. . E-mail address of corresponding author: vladan@vin.bg.ac.yu; Ljubenov, V.)

    2005-01-01

    The 6.5 MW heavy water RA research reactor at the VINCA Institute of Nuclear Sciences operated from 1959 to 1984. After 18 years of extended shutdown in 2002 it was decided that the reactor shutdown should be final. Preliminary decommissioning activities have been initiated by the end of 2002 under the Technical Co-operation Programme of the International Atomic Energy Agency. The objective of the project is to implement safe, timely and cost-effective decommissioning of the RA reactor up to unrestricted use of the site. Decommissioning project is closely related to two other projects: Safe Removal of the RA Reactor Spent Nuclear Fuel and Radioactive Waste Management in VINCA Institute. The main phases of the project include preparation of the detailed decommissioning plan, radiological characterization of the reactor site, dismantling and removal of the reactor components and structures, decontamination, final radiological site survey and the documentation of all the activities in order to obtain the approval for unrestricted use of the facility site. In this paper a review of the activities related to the preparation and realization of the RA reactor decommissioning project is given. Status of the project's organizational and technical aspects as for July 2004 are presented and plans for the forthcoming phases of the project realization are outlined. (author)

  18. Development of Technology for Effective Removal of Arsenic and Cyanides from Drinking Water and Wastewater

    Energy Technology Data Exchange (ETDEWEB)

    Jo, Jae

    2008-02-09

    The purpose of the project was to perform a joint research and development effort focused upon the development of methods and the prototype facility for effective removal of arsenic and cyanides from drinking water and wastewater, based on the UPEC patented technology. The goals of this project were to validate UPEC technology, to manufacture a prototype facility meeting the market requirements, and to introduce it to both industry and municipalities which deal with the water quality. The project involved design and fabrication of one experimental unit and one prototypical industrial unit, and tests at industrial and mining sites. The project used sodium ferrate (Na2FeO4) as the media to remove arsenic in drinking water and convert arsenic into non-hazardous form. The work consisted of distinct phases ending with specific deliverables in development, design, fabrication and testing of prototype systems and eventually producing validation data to support commercial introduction of technology and its successful implementation.

  19. Analysis of non simultaneous common mode failures. Application to the reliability assessment of the decay heat removal of the RNR 1500 project

    International Nuclear Information System (INIS)

    Natta, M.; Bloch, M.

    1991-01-01

    The experience with the LMFBR PHENIX has shown many cases of failures on identical and redundant components, which were close in time but not simultaneous and due to the same causes such as a design error, an unappropriate material, corrosion, ... Since the decay heat removal (DHR) must be assured for a long period after shutdown of the reactor, the overall reliability of the DHR system depends much on this type of successive failures by common mode causes, for which the usual β factor methods are not appropriate since they imply that the several failures are simultaneous. In this communication, two methods will be presented. The first one was used to assess the reliability of the DHR system of the RNR 1500 project. In this method, one modelize the occurrence of successive failures on n identical files by a sudden jump of the failure rate from the value λ attributed to the first failure to the value λ' attributed to the (n-1) still available files. This method leads to a quite natural quantification of the interest of diversity for highly redundant systems. For the RNR 1500 project where, in case of the loss of normal DHR path through the steam generators, the decay heat is removed by four separated sodium loops of 26 MW unit capacity in forced convection, the probabilistic assessment shows that it is necessary to diversify the sodium-sodium heat exchanger in order to fullfil the upper limit of 10 -7 /year for the probability of failure of DHR. A separate assessment for the main sequence leading to DHR loss was performed using a different method in which the successive failures are interpreted as a premature end of life, the lifetimes being directly used as random variables. This Monte-Carlo type method, which can be applied to any type of lifetime distribution, leads to results consistent to those obtained with the first one

  20. Field grouting summary report on the WAG 4 seeps 4 and 6 removal action project, Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 2: Appendixes A--D

    International Nuclear Information System (INIS)

    1997-05-01

    During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot program was performed inside portions of four unlined waste disposal trenches at Waste Area Grouping (WAG) 4 at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The project was deemed a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); however, due to a history of heavy precipitation in the fall, the schedule was fast-tracked to meet an October 31, 1996 grouting completion data. The technical objective of the removal action was to reduce the off-site transport of Strontium 90 ( 90 Sr) by grouting portions of four waste disposal trenches believed to be responsible for over 70% of the 90 Sr leaving the site. A goal of the grouting operation was to reduce the average in situ hydraulic conductivity of the grouted waste materials to a value equal to or less than 1 X 10 -6 cm/sec. This target hydraulic conductivity value was established to be at least two orders of magnitude lower than that of the surrounding natural ground. The main report describes brief background to the project, describes and analyzes the grouting operations, draws conclusions from the work performed, and presents some of the lessons learned. Appendices contain: (A) pipe driving records; (B) casing grout injection records; (C) in-situ hydraulic conductivity testing records; and (D) grout quality control testing records

  1. Soil treatment to remove uranium and related mixed radioactive contaminants. Final report September 1992--October 1995

    International Nuclear Information System (INIS)

    1996-07-01

    A research and development project to remove uranium and related radioactive contaminants from soil by an ultrasonically-aided chemical leaching process began in 1993. The project objective was to develop and design, on the basis of bench-scale and pilot-scale experimental studies, a cost-effective soil decontamination process to produce a treated soil containing less than 35 pCi/g. The project, to cover a period of about thirty months, was designed to include bench-scale and pilot-scale studies to remove primarily uranium from the Incinerator Area soil, at Fernald, Ohio, as well as strontium-90, cobalt-60 and cesium-137 from a Chalk River soil, at the Chalk River Laboratories, Ontario. The project goal was to develop, design and cost estimate, on the basis of bench-scale and pilot-scale ex-situ soil treatment studies, a process to remove radionuclides form the soils to a residual level of 35 pCi/g of soil or less, and to provide a dischargeable water effluent as a result of soil leaching and a concentrate that can be recovered for reuse or solidified as a waste for disposal. In addition, a supplementary goal was to test the effectiveness of in-situ soil treatment through a field study using the Chalk River soil

  2. Pentek metal coating removal system: Baseline report

    International Nuclear Information System (INIS)

    1997-01-01

    The Pentek coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU's evaluation of efficiency and cost, this report covers evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek coating removal system consisted of the ROTO-PEEN Scaler, CORNER-CUTTER reg-sign, and VAC-PAC reg-sign. They are designed to remove coatings from steel, concrete, brick, and wood. The Scaler uses 3M Roto Peen tungsten carbide cutters while the CORNER-CUTTER reg-sign uses solid needles for descaling activities. These hand tools are used with the VAC-PAC reg-sign vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure minimal, but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout

  3. Nutrient removal from Chinese coastal waters by large-scale seaweed aquaculture

    KAUST Repository

    Xiao, Xi

    2017-04-21

    China is facing intense coastal eutrophication. Large-scale seaweed aquaculture in China is popular, now accounting for over 2/3\\'s of global production. Here, we estimate the nutrient removal capability of large-scale Chinese seaweed farms to determine its significance in mitigating eutrophication. We combined estimates of yield and nutrient concentration of Chinese seaweed aquaculture to quantify that one hectare of seaweed aquaculture removes the equivalent nutrient inputs entering 17.8 ha for nitrogen and 126.7 ha for phosphorus of Chinese coastal waters, respectively. Chinese seaweed aquaculture annually removes approximately 75,000 t nitrogen and 9,500 t phosphorus. Whereas removal of the total N inputs to Chinese coastal waters requires a seaweed farming area 17 times larger than the extant area, one and a half times more of the seaweed area would be able to remove close to 100% of the P inputs. With the current growth rate of seaweed aquaculture, we project this industry will remove 100% of the current phosphorus inputs to Chinese coastal waters by 2026. Hence, seaweed aquaculture already plays a hitherto unrealized role in mitigating coastal eutrophication, a role that may be greatly expanded with future growth of seaweed aquaculture.

  4. Nutrient removal from Chinese coastal waters by large-scale seaweed aquaculture

    KAUST Repository

    Xiao, Xi; Agusti, Susana; Lin, Fang; Li, Ke; Pan, Yaoru; Yu, Yan; Zheng, Yuhan; Wu, Jiaping; Duarte, Carlos M.

    2017-01-01

    China is facing intense coastal eutrophication. Large-scale seaweed aquaculture in China is popular, now accounting for over 2/3's of global production. Here, we estimate the nutrient removal capability of large-scale Chinese seaweed farms to determine its significance in mitigating eutrophication. We combined estimates of yield and nutrient concentration of Chinese seaweed aquaculture to quantify that one hectare of seaweed aquaculture removes the equivalent nutrient inputs entering 17.8 ha for nitrogen and 126.7 ha for phosphorus of Chinese coastal waters, respectively. Chinese seaweed aquaculture annually removes approximately 75,000 t nitrogen and 9,500 t phosphorus. Whereas removal of the total N inputs to Chinese coastal waters requires a seaweed farming area 17 times larger than the extant area, one and a half times more of the seaweed area would be able to remove close to 100% of the P inputs. With the current growth rate of seaweed aquaculture, we project this industry will remove 100% of the current phosphorus inputs to Chinese coastal waters by 2026. Hence, seaweed aquaculture already plays a hitherto unrealized role in mitigating coastal eutrophication, a role that may be greatly expanded with future growth of seaweed aquaculture.

  5. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-24

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the removal action project at the former YS-860 Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects.

  6. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the removal action project at the former YS-860 Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead-contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects

  7. Flexible Reactive Berm (FRBerm) for Removal of Heavy Metals from Runoff Water

    Science.gov (United States)

    2016-03-01

    coefficient, and sediment clogging coefficients. Also, the flexible reactive barrier system permitted overtopping and filter socks would be arranged in a...FINAL REPORT Flexible Reactive Berm (FRBerm) for Removal of Heavy Metals from Runoff Water ESTCP Project ER-201213 MARCH 2016...GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME

  8. PROJECT-SPECIFIC TYPE A VERIFICATION FOR THE HIGH FLUX BEAM REACTOR UNDERGROUND UTILITIES REMOVAL PHASE 3 TRENCH 5, BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK

    International Nuclear Information System (INIS)

    Weaver, P.C.

    2010-01-01

    The Oak Ridge Institute for Science and Education (ORISE) has reviewed the project documentation and data for the High Flux Beam Reactor (HFBR) Underground Utilities removal Phase 3; Trench 5 at Brookhaven National Laboratory (BNL) in Upton, New York. The Brookhaven Survey Group (BSG) has completed removal and performed Final Status Survey (FSS) of the concrete duct from Trench 5 from Building 801 to the Stack. Sample results have been submitted as required to demonstrate that the cleanup goal of (le)15 mrem/yr above background to a resident in 50 years has been met. Four rounds of sampling, from pre-excavation to FSS, were performed as specified in the Field Sampling Plan (FSP) (BNL 2010a). It is the policy of the U.S. Department of Energy (DOE) to perform independent verifications of decontamination and decommissioning activities conducted at DOE facilities. ORISE has been designated as the organization responsible for this task for the HFBR Underground Utilities. ORISE, together with DOE, determined that a Type A verification of Trench 5 was appropriate based on recent verification results from Trenches 2, 3, and 4, and the minimal potential for residual radioactivity in the area. The removal of underground utilities is being performed in three stages to decommission the HFBR facility and support structures. Phase 3 of this project included the removal of at least 200 feet of 36-inch to 42-inch pipe from the west side to the south side of Building 801, and the 14-inch diameter Acid Waste Line that spanned from 801 to the Stack within Trench 5. Based on the pre-excavation sample results of the soil overburden the potential for contamination of the soil surrounding the pipe is minimal (BNL 2010a). ORISE reviewed the BNL FSP and identified comments for consideration (ORISE 2010). BNL prepared a revised FSP that resolved each ORISE comment adequately (BNL 2010a). ORISE referred to the revised HFBR Underground Utilities FSP FSS data to conduct the Type A verification

  9. ARSENIC REMOVAL BY IRON REMOVAL PROCESSES

    Science.gov (United States)

    Presentation will discuss the removal of arsenic from drinking water using iron removal processes that include oxidation/filtration and the manganese greensand processes. Presentation includes results of U.S. EPA field studies conducted in Michigan and Ohio on existing iron remo...

  10. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-28

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the Lead Source Removal Project at the Former YS-86O Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. This plan covers the removal actions at the Former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification/confirmation sampling, grading and revegetation. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects.

  11. Health and safety plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the Lead Source Removal Project at the Former YS-86O Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within the watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. This plan covers the removal actions at the Former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification/confirmation sampling, grading and revegetation. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects

  12. Sorbent Structural Impacts Due to Humidity on Carbon Dioxide Removal Sorbents for Advanced Exploration Systems

    Science.gov (United States)

    Watson, David; Knox, James C.; West, Phillip; Stanley, Christine M.; Bush, Richard

    2015-01-01

    The Life Support Systems Project (LSSP) under the Advanced Exploration Systems (AES) program builds upon the work performed under the AES Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project focusing on the numerous technology development areas. The CO2 removal and associated air drying development efforts are focused on improving the current state-of-the-art system on the International Space Station (ISS) utilizing fixed beds of sorbent pellets by seeking more robust pelletized sorbents, evaluating structured sorbents, and examining alternate bed configurations to improve system efficiency and reliability. A component of the CO2 removal effort encompasses structural stability testing of existing and emerging sorbents. Testing will be performed on dry sorbents and sorbents that have been conditioned to three humidity levels. This paper describes the sorbent structural stability screening efforts in support of the LSS Project within the AES Program.

  13. Bimetallic Treatment System (BTS) for Removal and Remediation of Polychlorinated Biphenyl from Marshall Space Flight Center's 4696 Fl Stand

    Science.gov (United States)

    Quinn, Jacqueline

    2006-01-01

    This Office of Space Flight (OSF)-funded project sought to demonstrate the application of a Bi-metallic Treatment System (BTS) to remove and degrade PCBs found on NASA facilities. The project initiated with the collection of PCB-containing materials from various MSFC and KSC structures, followed by laboratory evaluation of the BTS' PCB-removal efficiency, and concluded with a field demonstration at MSFC. The project evaluated the optimum formulation required to remove PCBs from aged and weathered paint with the goal of achieving final PCB concentrations less than 50 mg/Kg or 50 percent reduction where PCB starting levels were already below the 50 mg/Kg levels. Using lessons learned from this study, it was anticipated that the research team would be better able to make further recommendation on application strategies for future use of BTS for the treatment of PCB laden coatings on structures.

  14. JANUS reactor d and d project

    International Nuclear Information System (INIS)

    Fellhauer, C. R.

    1998-01-01

    Argonne National Laboratory (ANL-E) has recently completed the decontamination and decommissioning (D and D) of the JANUS Reactor Facility located in Building 202. The 200 KW reactor operated from August 1963 to March 1992. The facility was used to study the effects of both high and low doses of fission neutrons in animals. There were two exposure rooms on opposite sides of the reactor and the reactor was therefore named after the two-faced Roman god. The High Dose Room was capable of specimen exposure at a dose rate of 3,600 rads per hour. During calendar year 1996 a detailed characterization of the facility was performed by ANL-E Health Physics personnel. ANL-E Analytical Services performed the required sample analysis. An Auditable Safety Analysis and an Environmental Assessment were completed. D and D plans, procedures and procurement documents were prepared and approved. A D and D subcontractor was selected and a firm, fixed price contract awarded for the field work and final survey effort. The D and D subcontractor was mobilized to ANL-E in January 1997. Electrical isolation of all reactor equipment and control panels was accomplished and the equipment removed. A total of 207,230 pounds (94,082 Kg) of lead shielding was removed, surveyed and sampled, and free-released for recycle. All primary and secondary piping was removed, size reduced and packaged for disposal or recycled as appropriate. The reactor vessel was removed, sized reduced and packaged as radioactive waste in April. The activated graphite block reflector was removed next, followed by the bioshield concrete and steel. All of this material was packaged as low level waste. Total low level radioactive waste generation was 4002.1 cubic feet (113.3 cubic meters). Mixed waste generation was 538 cubic feet (15.2 cubic meters). The Final Release Survey was completed in September. The project field work was completed in 38 weeks without any lost-time accidents, personnel contaminations or unplanned

  15. Progress on the Hanford K basins spent nuclear fuel project

    International Nuclear Information System (INIS)

    Culley, G.E.; Fulton, J.C.; Gerber, E.W.

    1996-01-01

    This paper highlights progress made during the last year toward removing the Department of Energy's (DOE) approximately, 2,100 metric tons of metallic spent nuclear fuel from the two outdated K Basins at the Hanford Site and placing it in safe, economical interim dry storage. In the past year, the Spent Nuclear Fuel (SNF) Project has engaged in an evolutionary process involving the customer, regulatory bodies, and the public that has resulted in a quicker, cheaper, and safer strategy for accomplishing that goal. Development and implementation of the Integrated Process Strategy for K Basins Fuel is as much a case study of modern project and business management within the regulatory system as it is a technical achievement. A year ago, the SNF Project developed the K Basins Path Forward that, beginning in December 1998, would move the spent nuclear fuel currently stored in the K Basins to a new Staging and Storage Facility by December 2000. The second stage of this $960 million two-stage plan would complete the project by conditioning the metallic fuel and placing it in interim dry storage by 2006. In accepting this plan, the DOE established goals that the fuel removal schedule be accelerated by a year, that fuel conditioning be closely coupled with fuel removal, and that the cost be reduced by at least $300 million. The SNF Project conducted coordinated engineering and technology studies over a three-month period that established the technical framework needed to design and construct facilities, and implement processes compatible with these goals. The result was the Integrated Process Strategy for K Basins Fuel. This strategy accomplishes the goals set forth by the DOE by beginning fuel removal a year earlier in December 1997, completing it by December 1999, beginning conditioning within six months of starting fuel removal, and accomplishes it for $340 million less than the previous Path Forward plan

  16. PRECOMBUSTION REMOVAL OF HAZARDOUS AIR POLLUTANT PRECURSORS

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    2000-10-09

    In response to growing environmental concerns reflected in the 1990 Clean Air Act Amendment (CAAA), the United States Department of Energy (DOE) sponsored several research and development projects in late 1995 as part of an initiative entitled Advanced Environmental Control Technologies for Coal-Based Power Systems. The program provided cost-shared support for research and development projects that could accelerate the commercialization of affordable, high-efficiency, low-emission, coal-fueled electric generating technologies. Clean coal technologies developed under this program would serve as prototypes for later generations of technologies to be implemented in the industrial sector. In order to identify technologies with the greatest potential for commercial implementation, projects funded under Phase I of this program were subject to competitive review by DOE before being considered for continuation funding under Phase II. One of the primary topical areas identified under the DOE initiative relates to the development of improved technologies for reducing the emissions of air toxics. Previous studies have suggested that many of the potentially hazardous air pollutant precursors (HAPPs) occur as trace elements in the mineral matter of run-of-mine coals. As a result, these elements have the potential to be removed prior to combustion at the mine site by physical coal cleaning processes (i.e., coal preparation). Unfortunately, existing coal preparation plants are generally limited in their ability to remove HAPPs due to incomplete liberation of the mineral matter and high organic associations of some trace elements. In addition, existing physical coal cleaning plants are not specifically designed or optimized to ensure that high trace element rejections may be achieved.

  17. Zeolites as catalyzer to environmental control. Nitric oxide removal

    International Nuclear Information System (INIS)

    Montes, C.; Zapata N, M; Villa H, A.L.

    1995-01-01

    Zeolites and the microporous materials related to them are a class of environmental catalysts, it which are used to remove the produced gases in combustion process (as mobile sources). In this work the importance that has catalysis for environment improvement is emphasized. A review of recent progress in the use of certain zeolitic material as catalysts for nitric oxide elimination of combustion systems is presented. More used nitric oxide removal methods are presented, as well as its advantages and disadvantages. Furthermore, it is emphasized on the need of accomplishing more investigation projects on the development of an active catalyst for the decomposition of the nitric oxide in its elements (N and O)

  18. Horizontal Heat Exchanger Design and Analysis for Passive Heat Removal Systems

    Energy Technology Data Exchange (ETDEWEB)

    Vierow, Karen

    2005-08-29

    This report describes a three-year project to investigate the major factors of horizontal heat exchanger performance in passive containment heat removal from a light water reactor following a design basis accident LOCA (Loss of Coolant Accident). The heat exchanger studied in this work may be used in advanced and innovative reactors, in which passive heat removal systems are adopted to improve safety and reliability The application of horizontal tube-bundle condensers to passive containment heat removal is new. In order to show the feasibility of horizontal heat exchangers for passive containment cooling, the following aspects were investigated: 1. the condensation heat transfer characteristics when the incoming fluid contains noncondensable gases 2. the effectiveness of condensate draining in the horizontal orientation 3. the conditions that may lead to unstable condenser operation or highly degraded performance 4. multi-tube behavior with the associated secondary-side effects This project consisted of two experimental investigations and analytical model development for incorporation into industry safety codes such as TRAC and RELAP. A physical understanding of the flow and heat transfer phenomena was obtained and reflected in the analysis models. Two gradute students (one funded by the program) and seven undergraduate students obtained research experience as a part of this program.

  19. Enhanced removal of radioactive particles by fluorocarbon surfactant solutions

    International Nuclear Information System (INIS)

    Kaiser, R.; Harling, O.K.

    1993-08-01

    The proposed research addressed the application of ESI's particle removal process to the non-destructive decontamination of nuclear equipment. The cleaning medium used in this process is a solution of a high molecular weight fluorocarbon surfactant in an inert perfluorinated liquid which results in enhanced particle removal. The perfluorinated liquids of interest, which are recycled in the process, are nontoxic, nonflammable, and environmentally compatible, and do not present a hazard to the ozone layer. The information obtained in the Phase 1 program indicated that the proposed ESI process is technically effective and economically attractive. The fluorocarbon surfactant solutions used as working media in the ESI process survived exposure of up to 10 Mrad doses of gamma rays, and are considered sufficiently radiation resistant for the proposed process. Ultrasonic cleaning in perfluorinated surfactant solutions was found to be an effective method of removing radioactive iron (Fe 59) oxide particles from contaminated test pieces. Radioactive particles suspended in the process liquids could be quantitatively removed by filtration through a 0.1 um membrane filter. Projected economics indicate a pre-tax pay back time of 1 month for a commercial scale system

  20. Potential Fallouts of Accidental Ingestion of Limescale Removers

    Czech Academy of Sciences Publication Activity Database

    Navrátil, Tomáš; Říčařová, B.; Šenholdová, Z.; Rakovcová, H.; Pelclová, D.

    2007-01-01

    Roč. 101, č. 14 (2007), s. 138-140 ISSN 0009-2770. [Mezioborová česko-slovenská toxikologická konference /12./. Praha, 11.06.2007-13.06.2007] R&D Projects: GA ČR GA203/07/1195 Institutional research plan: CEZ:AV0Z40400503 Keywords : Limescale remover * titratable acid reserve (TAR) * water acidity Subject RIV: CF - Physical ; Theoretical Chemistry Impact factor: 0.683, year: 2007

  1. Hair Removal

    Science.gov (United States)

    ... Staying Safe Videos for Educators Search English Español Hair Removal KidsHealth / For Teens / Hair Removal What's in ... you need any of them? Different Types of Hair Before removing hair, it helps to know about ...

  2. PUREX transition project case study

    International Nuclear Information System (INIS)

    Jasen, W.G.

    1996-01-01

    In December 1992, the US Department of Energy (DOE) directed that the Plutonium-Uranium Extraction (PUREX) Plant be shut down and deactivated because it was no longer needed to support the nation's production of weapons-grade plutonium. The PUREX/UO 2 Deactivation Project will establish a safe and environmentally secure configuration for the facility and preserve that configuration for 10 years. The 10-year span is used to predict future maintenance requirements and represents the estimated time needed to define, authorize, and initiate the follow-on decontamination and decommissioning activities. Accomplishing the deactivation project involves many activities. Removing major hazards, such as excess chemicals, spent fuel, and residual plutonium are major goals of the project. The scope of the PUREX Transition Project is described within

  3. Optimized biofilm-based systems for removal of pharmaceuticals from hospital waste water

    DEFF Research Database (Denmark)

    Andersen, Henrik R; Chhetri, Ravi; Hansen, Kamilla

    Discharge of hospital wastewater is of increasing concern, as hospitals are identified as chemical pollution source due to pharmaceutical content. This project seeks to develop the most efficient and economically feasible technology to remove pharmaceuticals from wastewater, regardless of the poi...

  4. Project management for engineers

    CERN Document Server

    Bennett, Michael J

    2014-01-01

    Project Management for Engineers, as the title suggests, is a direct attempt at addressing the ever-increasing and specific needs for better project management of engineering students, practicing engineers and managers in the industry. It aims not only to present the principles and techniques of Project Management, but also to discuss project management standards, processes and requirements, such as PMBOK, IEEE and PRINCE. Each chapter begins with the basics of the theme being developed at a level understandable to an undergraduate, before more complex topics are introduced at the end of each section that are suitable for graduate students. For the practicing professionals or managers in the industry, the book also provides many real illustrations of practical application of the principles of Project Management. Through a realistic blend of theory and practical examples, as well as an integration of the engineering technical issues with business issues, this book seeks to remove the veil of mystery that has...

  5. Design, construction and monitoring of temporary storage facilities for removed contaminants

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Funaki, Hironori; Kurikami, Hiroshi; Sakamoto, Yoshiaki; Tokizawa, Takayuki

    2013-01-01

    Since the Fukushima Daiichi nuclear power plant accident caused by the Tohoku Region Pacific Coast Earthquake on March 11, 2011, decontamination work has been conducted in the surrounding environment within the Fukushima prefecture. Removed contaminants including soil, grass and trees are to be stored safely at temporary storage facilities for up to three years, after which they will be transferred to a planned interim storage facility. The decontamination pilot project was carried out in both the restricted and planned evacuation areas in order to assess decontamination methods and demonstrate measures for radiation protection of workers. Fourteen temporary storage facilities of different technical specifications were designed and constructed under various topographic conditions and land use. In order to support the design, construction and monitoring of temporary storage facilities for removed contaminants during the full-scale decontamination within the prefecture of Fukushima, technical know-how obtained during the decontamination pilot project has been identified and summarized in this paper. (author)

  6. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    International Nuclear Information System (INIS)

    Norton, S.H.

    2010-01-01

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  7. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    NORTON SH

    2010-02-23

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  8. Foreign object detection and removal to improve automated analysis of chest radiographs

    International Nuclear Information System (INIS)

    Hogeweg, Laurens; Sánchez, Clara I.; Melendez, Jaime; Maduskar, Pragnya; Ginneken, Bram van; Story, Alistair; Hayward, Andrew

    2013-01-01

    Purpose: Chest radiographs commonly contain projections of foreign objects, such as buttons, brassier clips, jewellery, or pacemakers and wires. The presence of these structures can substantially affect the output of computer analysis of these images. An automated method is presented to detect, segment, and remove foreign objects from chest radiographs.Methods: Detection is performed using supervised pixel classification with a kNN classifier, resulting in a probability estimate per pixel to belong to a projected foreign object. Segmentation is performed by grouping and post-processing pixels with a probability above a certain threshold. Next, the objects are replaced by texture inpainting.Results: The method is evaluated in experiments on 257 chest radiographs. The detection at pixel level is evaluated with receiver operating characteristic analysis on pixels within the unobscured lung fields and an A z value of 0.949 is achieved. Free response operator characteristic analysis is performed at the object level, and 95.6% of objects are detected with on average 0.25 false positive detections per image. To investigate the effect of removing the detected objects through inpainting, a texture analysis system for tuberculosis detection is applied to images with and without pathology and with and without foreign object removal. Unprocessed, the texture analysis abnormality score of normal images with foreign objects is comparable to those with pathology. After removing foreign objects, the texture score of normal images with and without foreign objects is similar, while abnormal images, whether they contain foreign objects or not, achieve on average higher scores.Conclusions: The authors conclude that removal of foreign objects from chest radiographs is feasible and beneficial for automated image analysis

  9. Pile Structure Program, Projected Start Date : January 1, 2010 (Implementation).

    Energy Technology Data Exchange (ETDEWEB)

    Collins, Chris; Corbett, Catherine [Lower Columbia River Estuary Partnership; Ebberts, Blaine [U.S. Army Corps of Engineers

    2009-07-27

    The 2008 Federal Columbia River Power System Biological Opinion includes Reasonable and Prudent Alternative 38-Piling and Piling Dike Removal Program. This RPA directs the Action Agencies to work with the Estuary Partnership to develop and implement a piling and pile dike removal program. The program has since evolved to include modifying pile structures to enhance their habitat value and complexity by adding large woody debris. The geographic extent of the Pile Structure Program (PSP) includes all tidally-influenced portions of the lower Columbia River below Bonneville Dam; however, it will focus on the mainstem. The overarching goal of the PSP is to enhance and restore ecosystem structure and function for the recovery of federally listed salmonids through the active management of pile structures. To attain this goal, the program team developed the following objectives: (1) Develop a plan to remove or modify pile structures that have lower value to navigation channel maintenance, and in which removal or modification will present low-risk to adjacent land use, is cost-effective, and would result in increased ecosystem function. (2) Determine program benefits for juvenile salmonids and the ecosystem through a series of intensively monitored pilot projects. (3) Incorporate best available science and pilot project results into an adaptive management framework that will guide future management by prioritizing projects with the highest benefits. The PSP's hypotheses, which form the basis of the pilot project experiments, are organized into five categories: Sediment and Habitat-forming Processes, Habitat Conditions and Food Web, Piscivorous Fish, Piscivorous Birds, and Toxic Contaminant Reduction. These hypotheses are based on the effects listed in the Estuary Module (NOAA Fisheries in press) and others that emerged during literature reviews, discussions with scientists, and field visits. Using pilot project findings, future implementation will be adaptively managed

  10. Controlling the Growth of Future LEO Debris Populations with Active Debris Removal

    Science.gov (United States)

    Liou, J.-C.; Johnson, N. L.; Hill, N. M.

    2008-01-01

    Active debris removal (ADR) was suggested as a potential means to remediate the low Earth orbit (LEO) debris environment as early as the 1980s. The reasons ADR has not become practical are due to its technical difficulties and the high cost associated with the approach. However, as the LEO debris populations continue to increase, ADR may be the only option to preserve the near-Earth environment for future generations. An initial study was completed in 2007 to demonstrate that a simple ADR target selection criterion could be developed to reduce the future debris population growth. The present paper summarizes a comprehensive study based on more realistic simulation scenarios, including fragments generated from the 2007 Fengyun-1C event, mitigation measures, and other target selection options. The simulations were based on the NASA long-term orbital debris projection model, LEGEND. A scenario, where at the end of mission lifetimes, spacecraft and upper stages were moved to 25-year decay orbits, was adopted as the baseline environment for comparison. Different annual removal rates and different ADR target selection criteria were tested, and the resulting 200-year future environment projections were compared with the baseline scenario. Results of this parametric study indicate that (1) an effective removal strategy can be developed based on the mass and collision probability of each object as the selection criterion, and (2) the LEO environment can be stabilized in the next 200 years with an ADR removal rate of five objects per year.

  11. Tidd PFBC demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Marrocco, M. [American Electric Power, Columbus, OH (United States)

    1997-12-31

    The Tidd project was one of the first joint government-industry ventures to be approved by the US Department of Energy (DOE) in its Clean Coal Technology Program. In March 1987, DOE signed an agreement with the Ohio Power Company, a subsidiary of American Electric Power, to refurbish the then-idle Tidd plant on the banks of the Ohio River with advanced pressurized fluidized bed technology. Testing ended after 49 months of operation, 100 individual tests, and the generation of more than 500,000 megawatt-hours of electricity. The demonstration plant has met its objectives. The project showed that more than 95 percent of sulfur dioxide pollutants could be removed inside the advanced boiler using the advanced combustion technology, giving future power plants an attractive alternative to expensive, add-on scrubber technology. In addition to its sulfur removal effectiveness, the plant`s sustained periods of steady-state operation boosted its availability significantly above design projections, heightening confidence that pressurized fluidized bed technology will be a reliable, baseload technology for future power plants. The technology also controlled the release of nitrogen oxides to levels well below the allowable limits set by federal air quality standards. It also produced a dry waste product that is much easier to handle than wastes from conventional power plants and will likely have commercial value when produced by future power plants.

  12. Scenario Development and Delphi Application in Life Cycle Assessment for Assessing Environmental Impact of New Technology Case Study: Removal of Wind Turbines Project

    Directory of Open Access Journals (Sweden)

    Devina Fitrika Dewi

    2016-05-01

    Full Text Available Certain technology is intended to create eco-efficient products or process or is developed as answer to the recent challenge. This kind of technology consequently can also create another impact therefore it shall be assessed and analyzed.The focus of the study is on assessment method namely Life Cycle Analysis (LCA, Scenario development and Delphi application. The objective is to understand benefits and drawbacks of the combined methodology and observe practicality of its implementation for assessing new technology. The distinctive feature comes from the combination of social and technological foresight (as Delphi application and future studies (as Scenario development which are applied in the environmental assessment of a product (by Life Cycle Analysis.The utilization of LCA-Scenario-Delphi case study as an explanatory example is presented in the Removal Wind Turbines Project by the Danish Energy Agency. The wind turbine is considered new technology with some of it phases are yet to occur, for example: removal of turbines after phase out stage. Technology Assessment by LCA-Scenario-Delphi is complicated procedure, but necessary to validate the results. The drawbacks of this procedure are extensive time it consumes and the dependency on public participation and/or expert willingness to participate. Nonetheless, its advantages are due to its interactive feature; integration of knowledge from different areas of expertise and its assessment’s characteristic which focuses on process.

  13. Channel response in a semiarid stream to removal of tamarisk and Russian olive

    Science.gov (United States)

    Jaeger, Kristin L.; Wohl, Ellen

    2011-02-01

    We report observed short-term (3 years) channel adjustment in an incised, semiarid stream to the removal of invasive plants, tamarisk (Tamarix spp.) and Russian olive (Elaeagnus angustifolia) by (1) removing the above-ground portion of the plant (cut-stump method) and (2) removing the entire plant (whole-plant method). The stream flows through Canyon de Chelly National Monument in Arizona, USA., draining an ˜1500 km2 catchment. Average channel width is 13 m; average thalweg depth is 2-3 m, although channel banks exceed 8 m locally. Channels adjusted primarily through widening, with significantly larger changes occurring in whole-plant removal reaches; however, neither plant removal method elicited large-scale bank destabilization, and the channels remained entrenched. Particular site conditions limiting large-scale destabilization include the absence of sufficient streamflow magnitudes, the presence of clay layers at the bank toe, the remaining presence of native vegetation, and the entrenched morphology. Our findings serve as a cautionary note regarding the temporal and spatial variability in channel response to invasive plant removal and underscore the importance of considering site-specific conditions in future restoration projects that include invasive plant removal.

  14. Establishing Trafficking in Human Beings for the Purpose of Organ Removal and Improving Cross-Border Collaboration in Criminal Cases: Recommendations.

    Science.gov (United States)

    Holmes, Paul; Rijken, Conny; D'Orsi, Sergio; Esser, Luuk; Hol, Floor; Gallagher, Anne; Greenberg, Galit; Helberg, Louis; Horvatits, Lisa; McCarthy, Sean; Ratel, Jonathan; Scheper-Hughes, Nancy; Forsythe, John

    2016-02-01

    In this short summary report on the legal definition of trafficking in human beings for the purpose of organ removal and improving cross-border collaboration in criminal cases, challenges, and recommendations in the areas of defining the crime, criminal investigation and prosecution, and cross-border cooperation are made. These are the outcomes of a working group discussion during the writers' conference of the HOTT project, a European Union-funded project against trafficking in human beings for the purpose of organ removal.

  15. Removal Action Work Plan for 105-DR and 105-F Building Interim Safe Storage Projects and Ancillary Buildings

    International Nuclear Information System (INIS)

    Morton, M.R.

    2000-01-01

    This document contains the removal action work plan for the 105-DR and 105-F Reactor buildings and ancillary facilities. These buildings and facilities are located in the 100-D/DR and 100-F Areas of the Hanford Site, which is owned and operated by the US Department of Energy (DOE), in Benton County, Washington. The 100 Areas (including the 100-D/DR and 100-F Areas) of the Hanford Site were placed on the US Environmental Protection Agency's (EPA's) National Priorities List under the ''Comprehensive Environmental Response, Compensation, and Liability Act of 1980'' (CERCLA). The DOE has determined that hazardous substances in the 105-DR and 105-F Reactor buildings and four ancillary facilities present a potential threat to human health or the environment. The DOE has also determined that a non-time critical removal action is warranted at these facilities. Alternatives for conducting a non-time critical removal action were evaluated in the ''Engineering Evaluation/Cost Analysis for the 105-DR and 105-F Reactor Facilities and Ancillary Facilities'' (DOE-RL 1998a). The engineering evaluation/cost analysis (EE/CA) resulted in the recommendation to decontaminate and demolish the contaminated reactor buildings (except for the reactor blocks) and the ancillary facilities and to construct a safe storage enclosure (SSE) over the reactor blocks. The recommendation was approved in an action memorandum (Ecology et al. 1998) signed by the Washington State Department of Ecology (Ecology), EPA, and DOE. The DOE is the agency responsible for implementing the removal actions in the 105-D/DR and 105-F Areas. Ecology is the lead regulatory agency for facilities in the 100-D/DR Area, and EPA is the lead regulatory agency for facilities in the 100-F Area. The term ''lead regulator agency'' hereinafter, refers to these authorities. This removal action work plan supports implementation of the non-time critical removal action

  16. Efficient pollutants removal by amino-modified nanocellulose impregnated with iron oxide

    Directory of Open Access Journals (Sweden)

    Taleb Khaled A.

    2016-01-01

    Full Text Available A novel adsorbents NC-PEG, obtained by the modification of nanocellulose (NC with PEG-6-arm amino polyethylene glycol (PEG-NH2 via maleic anhydride (MA linker, was used for the removal of Cd2+ and Ni2+ from water. Subsequent precipitation of goethite (FO on NC-PEG produced NC-PEG/FO adsorbent which was used for As(V and As(III removal. In a batch test, the influence of pH, contact time, initial ion concentration and temperature on adsorption efficiency were studied. The maximum adsorption capacities found for Cd2+ and Ni2+, obtained by the use of Langmuir model, were 37.9 and 32.4 mg g−1 at 25 °C, respectively. Also, high As(V and As(III removal capacity of 26.0 and 23.6 mg g-1 were obtained. Thermodynamic parameters indicate endothermic, feasible and spontaneous nature of adsorption process. Kinetic study, i.e. fitting by Weber-Morris model predicted intra-particle diffusion as a rate-controlling step. Multi-cycle reusability of both NC-PEG and NC-PEG/FO, significantly affects the affordability of techno-economic indicators for consideration of their possible application. [Ministry of Education, Science and Technological developments of the Republic of Serbia, Project No. 172013, and University of Defence, Republic of Serbia, project VA-TT/4/16-18

  17. Formation, Sintering and Removal of Biomass Ash Deposits

    DEFF Research Database (Denmark)

    Laxminarayan, Yashasvi

    conditions in laboratory-scale setups. Deposit formation was simulated in an Entrained Flow Reactor, to investigate the effect of operating conditions and ash chemistry on the rate of deposit formation. Experiments were performed using model biomass fly ash, prepared from mixtures of K2Si4O9, KCl, K2SO4, Ca....... Moreover, biomass ash deposits may cause severe corrosion of boiler surfaces. Therefore, reducing deposit formation and timely deposit removal are essential for optimal boiler operation. The formation, sintering and removal of boiler deposits has been investigated in this PhD project, by simulating boiler...... temperature increased the sticking probability of the fly ash particles/deposit surface, thereby increasing the rate of deposit formation. However, increasing flue gas velocity resulted in a decrease in the deposit formation rate, due to increased particle rebound. Furthermore, it was observed...

  18. HAPs-Rx: Precombustion Removal of Hazardous Air Pollutant Precursors

    Energy Technology Data Exchange (ETDEWEB)

    David J. Akers; Clifford E. Raleigh

    1998-03-16

    CQ Inc. and its project team members--Howard University, PrepTech Inc., Fossil Fuel Sciences, the United States Geological Survey (USGS), and industry advisors--are applying mature coal cleaning and scientific principles to the new purpose of removing potentially hazardous air pollutants from coal. The team uniquely combines mineral processing, chemical engineering, and geochemical expertise. This project meets more than 11 goals of the U.S. Department of Energy (DOE), the National Energy Strategy, and the 1993 Climate Change Action Plan. During this project: (1) Equations were developed to predict the concentration of trace elements in as-mined and cleaned coals. These equations, which address both conventional and advanced cleaning processes, can be used to increase the removal of hazardous air pollutant precursors (HAPs) by existing cleaning plants and to improve the design of new cleaning plants. (2) A promising chemical method of removing mercury and other HAPs was developed. At bench-scale, mercury reductions of over 50 percent were achieved on coal that had already been cleaned by froth flotation. The processing cost of this technology is projected to be less than $3.00 per ton ($3.30 per tonne). (3) Projections were made of the average trace element concentration in cleaning plant solid waste streams from individual states. Average concentrations were found to be highly variable. (4) A significantly improved understanding of how trace elements occur in coal was gained, primarily through work at the USGS during the first systematic development of semiquantitative data for mode of occurrence. In addition, significant improvement was made in the laboratory protocol for mode of occurrence determination. (5) Team members developed a high-quality trace element washability database. For example, the poorest mass balance closure for the uncrushed size and washability data for mercury on all four coals is 8.44 percent and the best is 0.46 percent. This indicates an

  19. Criticality safety aspects of K-25 Building uranium deposit removal

    International Nuclear Information System (INIS)

    Haire, M.J.; Jordan, W.C.; Ingram, J.C. III; Stinnet, E.C. Jr.

    1995-01-01

    The K-25 Building of the Oak Ridge Gaseous Diffusion Plant (now the K-25 Site) went into operation during World War II as the first large scale production plant to separate 235 U from uranium by the gaseous diffusion process. It operated successfully until 1964, when it was placed in a stand-by mode. The Department of Energy has initiated a decontamination and decommissioning program. The primary objective of the Deposit Removal (DR) Project is to improve the nuclear criticality safety of the K-25 Building by removing enriched uranium deposits from unfavorable-geometry process equipment to below minimum critical mass. The method utilized to accomplish this are detailed in this report

  20. Criticality safety aspects of K-25 Building uranium deposit removal

    Energy Technology Data Exchange (ETDEWEB)

    Haire, M.J.; Jordan, W.C. [Oak Ridge National Lab., TN (United States); Ingram, J.C. III; Stinnet, E.C. Jr. [Oak Ridge K-25 Site, TN (United States)

    1995-12-31

    The K-25 Building of the Oak Ridge Gaseous Diffusion Plant (now the K-25 Site) went into operation during World War II as the first large scale production plant to separate {sup 235}U from uranium by the gaseous diffusion process. It operated successfully until 1964, when it was placed in a stand-by mode. The Department of Energy has initiated a decontamination and decommissioning program. The primary objective of the Deposit Removal (DR) Project is to improve the nuclear criticality safety of the K-25 Building by removing enriched uranium deposits from unfavorable-geometry process equipment to below minimum critical mass. The method utilized to accomplish this are detailed in this report.

  1. Mercury Removal from MSW Incineration Flue Gas by Mineral-based Sorbents.

    Czech Academy of Sciences Publication Activity Database

    Rumayor, Marta; Svoboda, Karel; Švehla, Jaroslav; Pohořelý, Michael; Šyc, Michal

    Roč. 73, DEC 13 ( 2018 ), s. 265-270 ISSN 0956-053X R&D Projects: GA TA ČR TE02000236 Institutional support: RVO:67985858 Keywords : mercury * removal * mineral sorbents Subject RIV: DI - Air Pollution ; Quality OBOR OECD: Environmental sciences (social aspects to be 5.7) Impact factor: 4.030, year: 2016

  2. Mercury Removal from MSW Incineration Flue Gas by Mineral-based Sorbents.

    Czech Academy of Sciences Publication Activity Database

    Rumayor, Marta; Svoboda, Karel; Švehla, Jaroslav; Pohořelý, Michael; Šyc, Michal

    2018-01-01

    Roč. 73, DEC 13 (2018), s. 265-270 ISSN 0956-053X R&D Projects: GA TA ČR TE02000236 Institutional support: RVO:67985858 Keywords : mercury * removal * mineral sorbents Subject RIV: DI - Air Pollution ; Quality OBOR OECD: Environmental sciences (social aspects to be 5.7) Impact factor: 4.030, year: 2016

  3. Hot demonstration of proposed commercial cesium removal technology

    International Nuclear Information System (INIS)

    Lee, D.D.; Travis, J.R.; Gibson, M.R.

    1997-12-01

    This report describes the work done in support of the development of technology for the continuous removal and concentration of radioactive cesium in supernatant from Melton Valley Storage Tanks (MVSTs) at the ORNL site. The primary objective was to test candidate absorbers and ion exchangers under continuous-flow conditions using actual supernatant from the MVSTs. An experimental system contained in a hot-cell facility was constructed to test the materials in columns or modules using the same batch of supernatant to allow comparison on an equal basis. Resorcinol/formaldehyde (RF) resin was evaluated at three flow rates with 50% breakthrough ranges of 35 to 50 column volumes (CV) and also through a series of five loading/elution/regeneration cycles. The results reported here include the cesium loading breakthrough curves, elution curves (when applicable), and operational problems and observations for each material. The comparative evaluations should provide critical data for the selection of the sorbent for the ORNL Cesium Removal Demonstration project. These results will be used to help determine the design parameters for demonstration-scale systems. Such parameters include rates of cesium removal, quantity of resin or sorbent to be used, and elution and regeneration requirements, if applicable

  4. Subtidal Bathymetric Changes by Shoreline Armoring Removal and Restoration Projects

    Science.gov (United States)

    Wallace, J.

    2016-12-01

    The Salish Sea, a region with a diverse coastline, is altered by anthropogenic shoreline modifications such as seawalls. In recent years, local organizations have moved to restore these shorelines. Current research monitors the changes restoration projects have on the upper beach, lower beach, and intertidal, however little research exists to record possible negative effects on the subtidal. The purpose of this research is to utilize multibeam sonar bathymetric data to analyze possible changes to the seafloor structure of the subtidal in response to shoreline modification and to investigate potential ecosystem consequences of shoreline alteration. The subtidal is home to several species including eelgrass (Zostera marina). Eelgrass is an important species in Puget Sound as it provides many key ecosystem functions including providing habitat for a wide variety of organisms, affecting the physics of waves, and sediment transport in the subtidal. Thus bathymetric changes could impact eelgrass growth and reduce its ability to provide crucial ecosystem services. Three Washington state study sites of completed shoreline restoration projects were used to generate data from areas of varied topographic classification, Seahurst Park in Burien, the Snohomish County Nearshore Restoration Project in Everett, and Cornet Bay State Park on Whidbey Island. Multibeam sonar data was acquired using a Konsberg EM 2040 system and post-processed in Caris HIPS to generate a base surface of one-meter resolution. It was then imported into the ArcGIS software suite for the generation of spatial metrics. Measurements of change were calculated through a comparison of historical and generated data. Descriptive metrics generated included, total elevation change, percent area changed, and a transition matrix of positive and negative change. Additionally, pattern metrics such as, surface roughness, and Bathymetric Position Index (BPI), were calculated. The comparison of historical data to new data

  5. Benefits Analysis of Past Projects. Volume 2. Individual Project Assessments.

    Science.gov (United States)

    1984-11-01

    010 inch. Chemical milling was found to be an effective method for removing the surface enrichment. Also 4140 and H13 steel dies were found to result... tooling surface due to the reaction r,* it;nium and t . 22-4-9 steel toolin,. Oxidation and leveling .I ,.. Jevelope in this project yielded tool life...dimensions without expensive tool rework. The process has a potential for reducing mold inclusions since the mold surfaces in contact with the metal can

  6. PRECOMBUSTION REMOVAL OF HAZARDOUS AIR POLLUTANT PRECURSORS; FINAL

    International Nuclear Information System (INIS)

    Unknown

    2000-01-01

    In response to growing environmental concerns reflected in the 1990 Clean Air Act Amendment (CAAA), the United States Department of Energy (DOE) sponsored several research and development projects in late 1995 as part of an initiative entitled Advanced Environmental Control Technologies for Coal-Based Power Systems. The program provided cost-shared support for research and development projects that could accelerate the commercialization of affordable, high-efficiency, low-emission, coal-fueled electric generating technologies. Clean coal technologies developed under this program would serve as prototypes for later generations of technologies to be implemented in the industrial sector. In order to identify technologies with the greatest potential for commercial implementation, projects funded under Phase I of this program were subject to competitive review by DOE before being considered for continuation funding under Phase II. One of the primary topical areas identified under the DOE initiative relates to the development of improved technologies for reducing the emissions of air toxics. Previous studies have suggested that many of the potentially hazardous air pollutant precursors (HAPPs) occur as trace elements in the mineral matter of run-of-mine coals. As a result, these elements have the potential to be removed prior to combustion at the mine site by physical coal cleaning processes (i.e., coal preparation). Unfortunately, existing coal preparation plants are generally limited in their ability to remove HAPPs due to incomplete liberation of the mineral matter and high organic associations of some trace elements. In addition, existing physical coal cleaning plants are not specifically designed or optimized to ensure that high trace element rejections may be achieved

  7. Robotic removal of zebra mussel accumulations in a nuclear power plant screenhouse

    International Nuclear Information System (INIS)

    Kotler, S.R.; Mallen, E.C.; Tamms, K.M.

    1995-01-01

    Zebra mussel accumulations in the power plant intake system have increased over the last four years and have become a maintenance issue. Several treatment methods have been used, including mechanical cleaning by divers. This is limited to areas of relatively low flow velocity. Various sections of the screenhouse are not accessible except during an outage or when one of the intake tunnels can be otherwise be blocked and flow reduced. In addition, diver services are relatively costly. For the above reasons, the Indiana Michigan Power Co., Cook Nuclear Plant, contracted with ARD Environmental Inc. to develop and test a robotic system as an alternative to cleaning by divers. The first phase of this project addressed the requirement to clean the screenhouse floor in all areas, including those with high flow velocity. Subsequent phases will address robotic cleaning of other areas of the intake and the screenhouse structures. The objectives of the project were to: (1) Demonstrate the ability to deploy and retrieve a modified XT1000 vehicle in the inlet bay and screen bays; (2) Remove the accumulations of zebra mussels and possibly other pumpable material from the floor; (3) Reduce or eliminate the need for diver services and reduce overall cost of removing accumulations of zebra mussels; and, (4) Critique operations and develop recommendations for further enhancements to the robotic equipment and materials handling system. Implementation of the operating plan commenced on September 8, 1994, and was completed on October 7, 1994. The project demonstrated that robotic techniques are an efficient and cost effective alternative to diver operations for mechanical removal of zebra mussels. In particular, the robotic system was able to operate effectively in the high flow velocity areas including those at the intake tunnels. The ability to operate in the high flow areas means that zebra mussel removal may take place at any time, without affecting normal plant operations

  8. 77 FR 35366 - Albany-Eugene Transmission Line Rebuild Project

    Science.gov (United States)

    2012-06-13

    ... materials, removing vegetation including danger trees, and revegetating areas disturbed by construction... implement the Proposed Action Alternative, based on the Albany-Eugene Transmission Line Rebuild Project (DOE...

  9. Improving Software Engineering on NASA Projects

    Science.gov (United States)

    Crumbley, Tim; Kelly, John C.

    2010-01-01

    Software Engineering Initiative: Reduces risk of software failure -Increases mission safety. More predictable software cost estimates and delivery schedules. Smarter buyer of contracted out software. More defects found and removed earlier. Reduces duplication of efforts between projects. Increases ability to meet the challenges of evolving software technology.

  10. Removal and recovery of toxic metal ions from aqueous waste sites using polymer pendant ligands

    International Nuclear Information System (INIS)

    Fish, D.

    1996-01-01

    The purpose of this project is to investigate the use of polymer pendant ligand technology to remove and recover toxic metal ions from DOE aqueous waste sites. Polymer pendant lgiands are organic ligands, anchored to crosslinked, modified divinylbenzene-polystyrene beads, that can selectively complex metal ions. The metal ion removal step usually occurs through a complexation or ion exchange phenomena, thus recovery of the metal ions and reuse of the beads is readily accomplished

  11. Project Management Plan 105-KE Basin sludge retrieval and packaging

    International Nuclear Information System (INIS)

    McWethy, L.M.

    1994-01-01

    The KE Basin contains over 1,100 metric tons of spent nuclear fuel (SNF). The bulk of this inventory consists of over 50,000 zircaloy clad, uranium metal N-Reactor fuel element assemblies, along with less than half a metric ton of single-pass reactor fuel elements, stored in over 3,600 open top canister assemblies. In addition, sludge containing fissile and fission product material from damaged/degraded fuel has accumulated in the basin. The sludge, particularly the fines, impacts basin operations by clouding the water and making activities requiring a clear view impossible to complete until after sludge settles. Packaging would get the sludge out of the operator's way and allow it to be moved within the basin in a more manageable state. The primary project objective is to develop, procure, and quality the equipment needed to remove all sludge from the KE Basin with minimal dose commitment, minimal cost, and on schedule. The project will provide: (1) the development, testing, and installation of equipment for sludge retrieval and packaging; (2) understanding of and experience with actual sludge through near-term sludge packaging feature tests in the KE Basin; (3) sludge removal and handling equipment required to support debris removal, fuel handling, and other activities involving sludge within the KE Basin; and (4) enlist industry expertise in all phases of the project. This Project Management Plant establishes the organizational responsibilities, control systems, and procedures for the execution of project activities for KE Basin sludge retrieval packaging, to meet programmatic requirements within authorized funding and approved schedules

  12. Risk factors for reinsertion of urinary catheter after early removal in thoracic surgical patients.

    Science.gov (United States)

    Young, John; Geraci, Travis; Milman, Steven; Maslow, Andrew; Jones, Richard N; Ng, Thomas

    2018-03-08

    To reduce the incidence of urinary tract infection, Surgical Care Improvement Project 9 mandates the removal of urinary catheters within 48 hours postoperatively. In patients with thoracic epidural anesthesia, we sought to determine the rate of catheter reinsertion, the complications of reinsertion, and the factors associated with reinsertion. We conducted a prospective observational study of consecutive patients undergoing major pulmonary or esophageal resection with thoracic epidural analgesia over a 2-year period. As per Surgical Care Improvement Project 9, all urinary catheters were removed within 48 hours postoperatively. Excluded were patients with chronic indwelling catheter, patients with urostomy, and patients requiring continued strict urine output monitoring. Multivariable logistic regression analysis was used to identify independent risk factors for urinary catheter reinsertion. Thirteen patients met exclusion criteria. Of the 275 patients evaluated, 60 (21.8%) required reinsertion of urinary catheter. There was no difference in the urinary tract infection rate between patients requiring reinsertion (1/60 [1.7%]) versus patients not requiring reinsertion (1/215 [0.5%], P = .389). Urethral trauma during reinsertion was seen in 1 of 60 patients (1.7%). After reinsertion, discharge with urinary catheter was required in 4 of 60 patients (6.7%). Multivariable logistic regression analysis found esophagectomy, lower body mass index, and benign prostatic hypertrophy to be independent risk factors associated with catheter reinsertion after early removal in the presence of thoracic epidural analgesia. When applying Surgical Care Improvement Project 9 to patients undergoing thoracic procedures with thoracic epidural analgesia, consideration to delayed removal of urinary catheter may be warranted in patients with multiple risk factors for reinsertion. Copyright © 2018 The American Association for Thoracic Surgery. Published by Elsevier Inc. All rights reserved.

  13. Sapucai River Project

    International Nuclear Information System (INIS)

    Duarte, A.L.; Rosa, M.J.

    1988-01-01

    The Sapucai River Project is a gold, ilmenite, monazite and zircon alluvial deposit. It is located on Sapucai River valley in the south of Minas Gerais State. The reserves are 28.000.000 m 3 of pay bed. The production will be 1.400.000 m 3 /year and the mine's life 20 years. A cutterhead suction dredge will do the overburden removal. The pay bed will be mined with an underwater bucket-wheel dredge. The ROM will be concentrated in a washing plant. The gold will be recovered by leaching method. The other heavy minerals will be recovered by electrostatic, magnetic and gravitic methods. SAMITRI believes that it's possible to implant and operate the Project without ecological damage. (author) [pt

  14. Performance evaluation of the PITBULL trademark pump for the removal of hazardous waste

    International Nuclear Information System (INIS)

    Hatchell, B.K.; Combs, W.H.; Hymas, C.R.; Powell, M.R.; Rinker, M.W.; White, M.

    1998-09-01

    One objective of the Waste Removal Project at the Department of Energy's Savannah River Site (SRS) is to explore methods to successfully remove waste heels that will remain in the high-level waste tanks after bulk waste removal has been completed. Tank closure is not possible unless this residue is removed. As much as 151,000 liters of residue can remain after a conventional waste removal campaign. The waste heels can be comprised of sludge, zeolite, and silica. The heels are generally hardened or compacted insoluble particulate with relatively rapid settling velocities. A PITBULL trademark pump is being considered by SRS to retrieve sludge-type waste from Tank 19. Sections 1 through 4 of this report present the scope and objectives of the test program, describe the principles of operation of the PITBULL, and present the test approach, set-up, and instrumentation. Test results, including pumping rates with water and slurry, are provided in Section 5, along with considerations for remote operation. Conclusions and recommendations are provided in Section 6

  15. BOA: Asbestos pipe insulation removal robot system. Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Schempf, H.; Bares, J.E.

    1995-02-01

    The project described in this report targets the development of a mechanized system for safe, cost-efficient and automated abatement of asbestos containing materials used as pipe insulation. Based on several key design criteria and site visits, a proof-of-concept prototype robot system, dubbed BOA, was designed and built, which automatically strips the lagging and insulation from the pipes, and encapsulates them under complete vacuum operation. The system can operate on straight runs of piping in horizontal or vertical orientations. Currently we are limited to four-inch diameter piping without obstacles as well as a somewhat laborious emplacement and removal procedure -- restrictions to be alleviated through continued development. BOA removed asbestos at a rate of 4-5 ft./h compared to 3 ft./h for manual removal of asbestos with a 3-person crew. The containment and vacuum system on BOA was able to achieve the regulatory requirement for airborne fiber emissions of 0.01 fibers/ccm/ 8-hr. shift. This program consists of two phases. The first phase was completed and a demonstration was given to a review panel, consisting of DOE headquarters and site representatives as well as commercial abatement industry representatives. Based on the technical and programmatic recommendations drafted, presented and discussed during the review meeting, a new plan for the Phase II effort of this project was developed. Phase 11 will consist of a 26-month effort, with an up-front 4-month site-, market-, cost/benefit and regulatory study before the next BOA robot (14 months) is built, and then deployed and demonstrated (3 months) at a DOE site (such as Fernald or Oak Ridge) by the beginning of FY`97.

  16. Technical specification improvements to containment heat removal and emergency core cooling systems: Final report

    International Nuclear Information System (INIS)

    Sullivan, W.P.; Ha, C.; Pentzien, D.C.; Visweswaran, S.

    1988-07-01

    This report presents the results of an analysis for technical specification improvements to the emergency core cooling systems (ECCS) and containment heat removal systems (EPRI Research Project 2142-3). The objective of this project is to further develop a reliability- and risk-based methodology to provide improvements by considering groups of surveillance test intervals and allowed out-of-service times jointly. This was done for the technical specifications for the ECCS, containment heat removal equipment, and supporting systems of a boiling water reactor plant. The project (1) developed a methodology for optimizing groups of surveillance test intervals and allowed out-of-service times jointly, (2) applied the methodology in a case study of a specific operating plant, Hatch-2, and (3) evaluated benefits of the application. The results of the case study demonstrate that beneficial technical specification improvements can be realized with application of the methodology. By tightening a small group of sensitive surveillance test intervals (STIs) and allowed out-of-service times (AOTs), a larger group of less sensitive STIs and AOTs can be extended resulting in an overall plant operating cost improvement without reducing the plant safety. The reliability- and risk-based methodology and results from this project can be effectively applied for technical specification improvements at other operating plants

  17. Spent Nuclear Fuel (SNF) Project Design Basis Capacity Study

    International Nuclear Information System (INIS)

    CLEVELAND, K.J.

    2000-01-01

    This study of the design basis capacity of process systems was prepared by Fluor Federal Services for the Spent Nuclear Fuel Project. The evaluation uses a summary level model of major process sub-systems to determine the impact of sub-system interactions on the overall time to complete fuel removal operations. The process system model configuration and time cycle estimates developed in the original version of this report have been updated as operating scenario assumptions evolve. The initial document released in Fiscal Year (FY) 1996 varied the number of parallel systems and transport systems over a wide range, estimating a conservative design basis for completing fuel processing in a two year time period. Configurations modeling planned operations were updated in FY 1998 and FY 1999. The FY 1998 Base Case continued to indicate that fuel removal activities at the basins could be completed in slightly over 2 years. Evaluations completed in FY 1999 were based on schedule modifications that delayed the start of KE Basin fuel removal, with respect to the start of KW Basin fuel removal activities, by 12 months. This delay resulted in extending the time to complete all fuel removal activities by 12 months. However, the results indicated that the number of Cold Vacuum Drying (CVD) stations could be reduced from four to three without impacting the projected time to complete fuel removal activities. This update of the design basis capacity evaluation, performed for FY 2000, evaluates a fuel removal scenario that delays the start of KE Basin activities such that staffing peaks are minimized. The number of CVD stations included in all cases for the FY 2000 evaluation is reduced from three to two, since the scenario schedule results in minimal time periods of simultaneous fuel removal from both basins. The FY 2000 evaluation also considers removal of Shippingport fuel from T Plant storage and transfer to the Canister Storage Building for storage

  18. New projects related to decommissioning

    International Nuclear Information System (INIS)

    Benbow, R.

    2008-01-01

    The PMU has been established in support of the KNPP Decommissioning Department. All of the Infrastructure Projects associated with Decommissioning have been identified and are being managed through the EBRD Procurement Process. The status of the following projects is presented: Evaluation of the Radiological Inventory for Units 1 to 4; Supply of Size Reduction and Decontamination Workshops; Dismantling Tools and Equipment; Heat Generation Plant; Environmental Assessment for Decommissioning; Decay Storage Site for Transitional RAW ; Information Centres for Decommissioning; Storage Site for Conventional Waste from Decommissioning; Inventory, Treatment an Conditioning of Contaminated Soil; Concrete Core Sampling Analysis; Asbestos Removal Equipment; Demolition Equipment

  19. Removing Hair Safely

    Science.gov (United States)

    ... For Consumers Home For Consumers Consumer Updates Removing Hair Safely Share Tweet Linkedin Pin it More sharing ... related to common methods of hair removal. Laser Hair Removal In this method, a laser destroys hair ...

  20. Offset project report : Cleanit Greenit aerobic composting project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-02-15

    The Cleanit Greenit site is owned and operated by Cleanit Greenit Composting System Inc. and is a composting facility located in Edmonton, Alberta. The facility has an annual processing capacity of 20,000 tonnes of organic waste and was the first in Canada to compost a large variety of industrial by-products containing hydrocarbons, through controlled blending with other wastes and monitoring of moisture, temperature and pH. The composting process turns organic waste material from industrial, commercial and domestic sources into finished projects, thus removing these materials from conditions where treatment and disposal is often difficult, expensive and environmentally harmful. This protocol document covered the diversion of organic residues from landfill for biological decomposition to a condition sufficiently stable for nuisance-free storage and for safe use in land application. A wide variety of organic residues were considered, including agricultural and agri-food residues; the organic portion of municipal solid waste; food wastes; and forestry and landscaping wastes. The document presented information on the Cleanit Greenit project and discussed the calculation of greenhouse gas emission reductions. An appendix that contained the Cleanit Greenit aerobic composting offset project plan was also provided. tabs., figs.

  1. Post Remedial Action Report, Lansdowne Radioactive Residence Complex, Dismantlement/Removal Project. Volume 1. Government Operations

    Science.gov (United States)

    1990-06-01

    to molecules of-hydrogen peroxide (and other oxydizing agents) which may produce other chemical reactions abnormal to the cells functioning. t If...antique mahogany furniture were carried from the house down to the OSF and successfully decontaminated by removing the finish with isopropyl alcohol (Figs

  2. Pentek metal coating removal system: Baseline report; Greenbook (chapter)

    International Nuclear Information System (INIS)

    1997-01-01

    The Pentek coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU's evaluation of efficiency and cost, this report covers evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek coating removal system consisted of the ROTO-PEEN Scaler, CORNER-CUTTER reg-sign, and VAC-PAC reg-sign. They are designed to remove coatings from steel, concrete, brick, and wood. The Scaler uses 3M Roto Peen tungsten carbide cutters while the CORNER-CUTTER reg-sign uses solid needles for descaling activities. These hand tools are used with the VAC-PAC reg-sign vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure minimal, but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout

  3. Common cuckoo females are not choosy when removing an egg during parasitism

    Czech Academy of Sciences Publication Activity Database

    Šulc, Michal; Procházka, Petr; Čapek, Miroslav; Honza, Marcel

    2016-01-01

    Roč. 27, č. 6 (2016), s. 1642-1649 ISSN 1045-2249 R&D Projects: GA ČR(CZ) GAP506/12/2404 Institutional support: RVO:68081766 Keywords : brood parasitism * coevolution * egg removal * great reed warbler * host and parasite * mimicry * reflectance * spotting pattern Subject RIV: EG - Zoology Impact factor: 3.311, year: 2016

  4. Computer Simulation and Modeling of CO2 Removal Systems for Exploration 2013-2014

    Science.gov (United States)

    Coker, R.; Knox, J.; Gomez, C.

    2015-01-01

    The Atmosphere Revitalization Recovery and Environmental Monitoring (ARREM) project was initiated in September of 2011 as part of the Advanced Exploration Systems (AES) program. Under the ARREM project and the follow-on Life Support Systems (LSS) project, testing of sub-scale and full-scale systems has been combined with multiphysics computer simulations for evaluation and optimization of subsystem approaches. In particular, this paper will describes the testing and 1-D modeling of the combined water desiccant and carbon dioxide sorbent subsystems of the carbon dioxide removal assembly (CDRA). The goal is a full system predictive model of CDRA to guide system optimization and development.

  5. Deactivation, Decontamination and Decommissioning Project Summaries

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, David Shane; Webber, Frank Laverne

    2001-07-01

    This report is a compilation of summary descriptions of Deactivation, Decontamination and Decommissioning, and Surveillance and Maintenance projects planned for inactive facilities and sites at the INEEL from FY-2002 through FY-2010. Deactivations of contaminated facilities will produce safe and stable facilities requiring minimal surveillance and maintenance pending further decontamination and decommissioning. Decontamination and decommissioning actions remove contaminated facilities, thus eliminating long-term surveillance and maintenance. The projects are prioritized based on risk to DOE-ID, the public, and the environment, and the reduction of DOE-ID mortgage costs and liability at the INEEL.

  6. Tank 5 Model for Sludge Removal Analysis

    International Nuclear Information System (INIS)

    LEE, SI

    2004-01-01

    Computational fluid dynamics methods have been used to develop and provide slurry pump operational guidance for sludge heel removal in Tank 5. Flow patterns calculated by the model were used to evaluate the performance of various combinations of operating pumps and their orientation under steady-state indexed and transient oscillation modes. A model used for previous analyses has been updated to add the valve housing distribution piping and pipe clusters of the cooling coil supply system near pump no. 8 to the previous tank Type-I model. In addition, the updated model included twelve concrete support columns. This model would provide a more accurate assessment of sludge removal capabilities. The model focused on removal of the sludge heel located near the wall of Tank 5 using the two new slurry pumps. The models and calculations were based on prototypic tank geometry and expected normal operating conditions as defined by Tank Closure Project Engineering. Computational fluid dynamics models of Tank 5 with different operating conditions were developed using the FLUENT (trademark) code. The modeling results were used to assess the efficiency of sludge suspension and removal operations in the 75-ft tank. The models employed a three-dimensional approach, a two-equation turbulence model, and an approximate representation of flow obstructions. The calculated local velocity was used as a measure of sludge removal and mixing capability. For the simulations, modeling calculations were performed with indexed pump orientations until an optimum flow pattern near the potential location of the sludge heel was established for sludge removal. The calculated results demonstrated that the existing slurry pumps running at 3801 gpm flowrate per nozzle could remove the sludge from the tank with a 101 in liquid level, based on a historical minimum sludge suspension velocity of 2.27 ft/sec. The only exception is the region within maximum 4.5 ft distance from the tank wall boundary at the

  7. A demonstration of biofiltration for VOC removal in petrochemical industries.

    Science.gov (United States)

    Zhao, Lan; Huang, Shaobin; Wei, Zongmin

    2014-05-01

    A biotrickling filter demo has been set up in a petrochemical factory in Sinopec Group for about 10 months with a maximum inlet gas flow rate of 3000 m3 h(-1). The purpose of this project is to assess the ability of the biotrickling filter to remove hardly biodegradable VOCs such as benzene, toluene and xylene which are recalcitrant and poorly water soluble and commonly found in petrochemical factories. Light-weight hollow ceramic balls (Φ 5-8 cm) were used as the packing media treated with large amounts of circulating water (2.4 m3 m(-2) h(-1)) added with bacterial species. The controlled empty bed retention time (EBRT) of 240 s is a key parameter for reaching a removal efficiency of 95% for benzene, toluene, xylene, and 90% for total hydrocarbons. The demo has been successfully adopted and practically applied in waste air treatments in many petrochemical industries for about two years. The net inlet concentrations of benzene, toluene and xylene were varied from 0.5 to 3 g m(-3). The biofiltration process is highly efficient for the removal of hydrophobic and recalcitrant VOCs with various concentrations from the petrochemical factories. The SEM analysis of the bacterial community in the BTF during VOC removal showed that Pseudomonas putida and Klebsiella sp. phylum were dominant and shutdown periods could play a role in forming the community structural differences and leading to the changes of removal efficiencies.

  8. Wastewater Triad Project: Solid-Liquid Separator FY 2000 Deployment

    International Nuclear Information System (INIS)

    Walker, J.F.

    2001-01-01

    The Wastewater Triad Project (WTP) consists of three operational units: the cesium removal (CsR) system, the out-of-tank evaporator (OTE) system, and the solid/liquid separation (SLS) system. These systems were designed to reduce the volume and radioactivity of low-level liquid waste (LLLW) stored in the Melton Valley Storage Tanks (MVSTs) and are operated independently or in series in order to accomplish the treatment goals. Each is a modular, skid-mounted system that is self-contained, individually shielded, and designed to be decontaminated and removed once the project has been completed. The CsR and OTE systems are installed inside Building 7877; the SLS system is installed adjacent to the east side of the MVST 7830 vault cover. The CsR, which consists of ion-exchange equipment for removing 137 Cs from LLLW, was demonstrated in 1997. During the Cesium Removal Demonstration, 30,853 gal of radioactive supernate was processed and 1142 Ci of 137 Cs was removed from the supernate and loaded onto 70 gal of a crystalline silicotitanate sorbent manufactured by UOP, Inc. The OTE system is a subatmospheric single-stage evaporator system designed to concentrate LLLW to smaller volumes. It was previously demonstrated in 1996 and was operated in 1998 to process about 80,000 gal of LLLW. The SLS system was designed to filter and remove suspended solids from LLLW in order to minimize further accumulation of sludge in new storage tanks or to prevent fouling of CsR and OTE systems. The SLS was installed and demonstrated in 1999; ∼45,000 gal of radioactive supernate was processed during the demonstration

  9. Turbidity removal: Gravel and charcoal as roughing filtration media

    Directory of Open Access Journals (Sweden)

    Josiah A. Adeyemo

    2010-10-01

    Full Text Available Roughing filtration is an important pre-treatment process for wastewater, because it efficiently separates fine solid particles over prolonged periods, without the addition of chemicals. For this study, a pilot plant was designed at Delmas Coal Mine in the Mpumalanga province of South Africa. The design and sizing of the pilot plant was guided by Wegelin’s design criteria. Gravel was used as a control medium because it is one of the most commonly used roughing filter media and because it was used in developing the criteria. We compared the performance of gravel as a filter medium to that of another locally available material, charcoal, for the removal of turbidity in wastewater. The pilot plant was monitored continuously for 90 days from commissioning until the end of the project. The overall performance of the roughing filter in turbidity removal, using gravel or charcoal, was considered efficient for the pre-treatment of waste water. Charcoal performed slightly better than gravel as a filter medium for the removal of turbidity, possibly because charcoal has a slightly higher specific surface area and porosity than gravel, which could enhance sedimentation and other filtration processes, such as adsorption, respectively.

  10. Project specific quality assurance plan for Project W-178, 219-S secondary containment

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The scope of this Quality Assurance Program Plan (QAPP) is to provide a system of Quality Assurance reviews and verifications on the design, procurement and construction of the 219-S Secondary Containment Upgrade. The reviews and verifications will be on activities associated with design, procurement, and construction of the Secondary Containment Upgrade which includes, but is not limited to demolition, removal, new tank installation, tank 103 isolation, tank cell refurbishment, electrical, instrumentation, piping/tubing including supports, pump and valves, and special coatings. The full project scope is defined in the project Functional Design Criteria (FDC), SD-W178-FDC-001, and all activities must be in compliance with this FDC and related design documentation

  11. Removal and Recovery of Organic Vapor Emissions by Fixed-Bed Activated Carbon Fiber Adsorber-Cryogenic Condenser

    National Research Council Canada - National Science Library

    Hay, K

    1998-01-01

    ... them. This project evaluated the ability of an activated carbon fiber cloth (ACFC) adsorption, electrothermal desorption, cryogenic-condensation system to remove 10 cu cm/min containing 1000 ppmv of methyl ethyl ketone (MEK...

  12. User Oriented Climatic Information for Planning a Snow Removal Budget.

    Science.gov (United States)

    Cohen, Stewart J.

    1981-12-01

    Many activities associated with the transportation sector are weather sensitive. This study is concerned with highway maintenance activities, specifically snow removal, and the budgeting of same by the Illinois Department of Transportation (IDOT). During the 1978-79 winter, IDOT's snow removal budget was exhausted by the end of January, thereby necessitating the procurement of emergency funds. The following year, the Illinois State Water Survey (ISWS) was asked to provide specialized climatic design information that could be used to assist IDOT in its budget planning for snow removal.Snow removal is often accomplished by spreading road salt over snow- and ice-covered roads, thus improving traction and reducing the risk of vehicles skidding along slippery surfaces. This study demonstrates the computation of `salt days,' a user-oriented climatic variable that indicates the number of days when road salt is required. This variable is defined using certain temperature and snowfall criteria. Results of a pilot study indicate that it is possible to provide statistical outlooks for salt days two months in advance, using correlation analysis. The analysis for several Illinois stations indicates that at various intervals in the data records, November and December temperatures are significantly correlated with February salt days if short periods of record (5-20 years) are used.IDOT originally requested a `2- to 3-month projection.' However, it became clear that only projections of 12 months or longer could benefit annual budget preparation. Confusion existed between the user and the supplier of climatic information regarding the user's needs, and the applicability of the supplier's `climate products' to the user's budget planning procedure. This demonstrates the need for a prolonged effort by the supplier to fully acquaint the user with the various forms of climatic information available. This gap in communication must be overcome so that applied climatology can be integrated

  13. Cleanup and treatment (CAT) test: a land-area decontamination project utilizing a vacuum method of soil removal

    International Nuclear Information System (INIS)

    Orcutt, J.A.

    1982-08-01

    Areas 11 and 13 of the Nevada Test Site (NTS) are contaminated with varying concentrations of Pu-239, 240 and Am-241. An investigation of a vacuum method of soil removal, the Cleanup and Treatment (CAT) test, was conducted over a 3-month period in the plutonium safety shot or Plutonium Valley portion of Area 11. Soil in Plutonium Valley is of the Aridisol Order. The surface 0 to 10 cm is a gravelly loam, and is strongly alkaline (pH 8.8). A large truck-mounted vacuum unit, rather than conventional earth-moving equipment, was used as the primary soil collection unit. Effectiveness of the vacuum method of soil removal was evaluated in relation to conventional earthmoving procedures, particularly in terms of volume reduction of removed soil achieved over conventional techniques. Radiological safety considerations associated with use of the vacuum unit were evaluated in relation to their impact on a full-scale land decontamination program. Environmental and operational impacts of devegetation with retention of root crowns or root systems were investigated. It is concluded that the CAT test was successful under difficult environmental conditions

  14. X-ray scatter removal by deconvolution

    International Nuclear Information System (INIS)

    Seibert, J.A.; Boone, J.M.

    1988-01-01

    The distribution of scattered x rays detected in a two-dimensional projection radiograph at diagnostic x-ray energies is measured as a function of field size and object thickness at a fixed x-ray potential and air gap. An image intensifier-TV based imaging system is used for image acquisition, manipulation, and analysis. A scatter point spread function (PSF) with an assumed linear, spatially invariant response is modeled as a modified Gaussian distribution, and is characterized by two parameters describing the width of the distribution and the fraction of scattered events detected. The PSF parameters are determined from analysis of images obtained with radio-opaque lead disks centrally placed on the source side of a homogeneous phantom. Analytical methods are used to convert the PSF into the frequency domain. Numerical inversion provides an inverse filter that operates on frequency transformed, scatter degraded images. Resultant inverse transformed images demonstrate the nonarbitrary removal of scatter, increased radiographic contrast, and improved quantitative accuracy. The use of the deconvolution method appears to be clinically applicable to a variety of digital projection images

  15. Removal of High -Concentration and Refractory Organic Matter from Diosgenin Manufacture Wastewater : a case study of a demonstration project in Hubei Province, P R China

    Science.gov (United States)

    Bao, J.; Wang, L.

    2009-12-01

    Wastewater from diosgenin manufacture is dark brown (3,500 ~4,000 times of the chroma) and acidic(pH=0.8~1.5)with high concentration of organic matter(COD=25,000~38,000 mg/L)and poor biodegradability(BOD5/COD= 0.25~0.30). It is highly toxic to biota due to the water-soluble saponin, tannins and pectin. Therefore removal of the organic matter is of great importance before the discharge of the wastewater into the environment. Here we presented a set of data from a demonstration project in Hubei province, P R China with an improved technics. This technics, focusing on the treatment of diosgenin wastewater, included hydrolytic acidification, internal electrolysis, neutralization, aerating-improved Up-flow Anaerobic Sludge Bed (UASB) and bio-contact oxidation treatment in sequence to remove the organic matter. After 60 days of starting-up, the water quality from hydrolytic acidification reactor was greatly improved. The effluent became clear, indicating the obvious removal of suspended solids in the water; the ratio of BOD/COD increased to 0.44, suggesting an significant increase of biodegradability; the content of volatile fatty acid (VFA) increased from 22.6 mmol/L to 86.8 mmol/L and the volume loading of COD reached 9.48 kg COD/(m3d). Basically at this stage the removal efficiency of COD was stabilized at 25%. Further treatment was conducted on the effluent from hydrolytic acidification reactor through the Improved UASB Reactor after the internal electrolysis and neutralization. The Improved UASB Reactor can start up at room temperature with an influent of 1,500 mg/L COD and inflow rate of 50(m3/d). Then, temperature was increased gradually to 38 oC (± 2 oC) to optimize the growth of the mesophilic anaerobes in the reactor. The content of VFA of the effluent was controlled below 8 mmol/L to guarantee the pH in the range of 6.8~7.2. After 150 days of debugging, the COD of the influent to UASB increased to 9,600 mg/L, hydraulic retaining time (HRT) was around 70 hrs

  16. Removal of radionuclides from household water; Metoder foer avlaegsnande av radionuklider fraan hushaallsvatten

    Energy Technology Data Exchange (ETDEWEB)

    Vesterbacka, P.; Turtiainen, T.; Haemaelaeinen, K.; Salonen, L.; Arvela, H.

    2007-02-15

    Research upon methods for removing radionuclides from household water was initiated in Finland in 1995. Three research projects, of which two were carried out with National Technology Agency of Finland and one with CEC, have been completed by the end of 2002. One of the main objectives of the research was to compose a guidebook for consumers and water treatment companies. Radon can be removed from household water by aeration and by activated carbon filtration. Aerators that are well designed and set up can remove over 90% of waterborne radon. The best aerators have achieved removal efficiencies that are nearly 100%. However, setting up an aeration system requires thorough planning. Also, activated carbon filtration removes radon efficiently. The removal efficiencies have been over 90%, often nearly 100%. Depending on the water quality and usage, the carbon batch inside the filter needs to be changed every 2 - 3 years. Since activated carbon filters emit gamma radiation while in use, they should not be installed inside the dwelling but in a separate building or by the well. It is recommended that uranium be removed from drinking water by anion exchange, which is the most efficient removal method for this purpose. Typically, the removal efficiencies are nearly 100%. The one exception is the so called tap filter, the removal efficiency of which depends on uranium concentration in raw water and the rate of water flow. High saline concentration in water may extricate uranium from ion exchange resin. Changes in plumbing pressure or pH-value do not have any significant influence in uranium retention. Removal efficiencies of lead and polonium vary a lot depending on the chemical form in which they occur in water. They can be reliably removed from water by reverse osmosis only. Other treatment methods, such as ion exchange and activated carbon filtration, remove lead and polonium partly. Lead and polonium are removed more efficiently when they are bound onto smaller

  17. PACTEL OECD project planning (PACO). PACTEL OECD project planning

    Energy Technology Data Exchange (ETDEWEB)

    Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)

    2004-07-01

    OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a

  18. Enhancing phosphorus removal in constructed wetlands with ochre from mine drainage treatment.

    Science.gov (United States)

    Heal, K V; Dobbie, K E; Bozika, E; McHaffie, H; Simpson, A E; Smith, K A

    2005-01-01

    No single end-use has yet been identified that is capable of consuming the projected production of ochre (mainly iron (III) oxides) from mine drainage treatment. However, the high sorption capacity of ochre for phosphorus (up to 26 mg kg(-1)) means that it could be used in constructed wetlands to enhance phosphorus removal. Laboratory batch experiments showed that coarse-grained ochre removes 90% of all phosphorus forms from sewage effluent after 15 minutes of shaking. From a larger-scale experiment, it is estimated that constructed wetlands with an ochre substrate should remove phosphorus from sewage effluent for up to 200-300 years. The suitability of ochre for phosphorus removal is being investigated at the field scale in a wastewater constructed wetland (175 m2 area) in Berwickshire, UK. The hydraulic and treatment performance of the wetland were monitored for 15 months prior to installation at the inlet in November 2003 of a tank containing approximately 1200 kg ochre. Results so far show that improved hydraulic design is required for ochre to increase the mean phosphorus removal efficiency of the system (27 +/- 28%), but potentially toxic metals (Al, Cd, Cr, Cu, Fe, Ni, Pb, Zn) have not been released from the ochre into the wetland outflow.

  19. Field grouting summary report on the WAG 4 seeps 4 and 6 removal action project, Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 3. Appendixes E and F

    International Nuclear Information System (INIS)

    1997-05-01

    During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot program was performed inside portions of four unlined waste disposal trenches at Waste Area Grouping (WAG) 4 at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The project was deemed a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); however, due to a history of heavy precipitation in the fall, the schedule was fast-tracked to meet an October 31, 1996 grouting completion date. The technical objective of the removal action was to reduce the off-site transport of j Strontium 90 ( 90 Sr) by grouting portions of four waste disposal trenches believed to be responsible for over 70 percent of the 90 Sr leaving the site. A goal of the grouting operation was to reduce the average in situ hydraulic conductivity of the grouted waste materials to a value equal to or less than 1 x 10 -6 cm/sec. This target hydraulic conductivity value was established to be at least two orders of magnitude lower than that of the surrounding natural ground

  20. Field grouting summary report on the WAG 4 seeps 4 and 6 removal action project, Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 3. Appendixes E and F

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    During the summer of 1996, a unique multi-phase, multi-stage, low-pressure permeation grouting pilot program was performed inside portions of four unlined waste disposal trenches at Waste Area Grouping (WAG) 4 at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The project was deemed a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); however, due to a history of heavy precipitation in the fall, the schedule was fast-tracked to meet an October 31, 1996 grouting completion date. The technical objective of the removal action was to reduce the off-site transport of j Strontium 90 ({sup 90}Sr) by grouting portions of four waste disposal trenches believed to be responsible for over 70 percent of the {sup 90}Sr leaving the site. A goal of the grouting operation was to reduce the average in situ hydraulic conductivity of the grouted waste materials to a value equal to or less than 1 x 10{sup -6} cm/sec. This target hydraulic conductivity value was established to be at least two orders of magnitude lower than that of the surrounding natural ground.

  1. Influence of groundwater composition on subsurface iron and arsenic removal

    KAUST Repository

    Moed, David H.; Van Halem, Doris; Verberk, J. Q J C; Amy, Gary L.; Van Dijk, Johannis C.

    2012-01-01

    Subsurface arsenic and iron removal (SAR/SIR) is a novel technology to remove arsenic, iron and other groundwater components by using the subsoil. This research project investigated the influence of the groundwater composition on subsurface treatment. In anoxic sand column experiments, with synthetic groundwater and virgin sand, it was found that several dissolved substances in groundwater compete for adsorption sites with arsenic and iron. The presence of 0.01 mmol L -1phosphate, 0.2 mmol L -1 silicate, and 1 mmol L -1 nitrate greatly reduced the efficiency of SAR, illustrating the vulnerability of this technology in diverse geochemical settings. SIR was not as sensitive to other inorganic groundwater compounds, though iron retardation was limited by 1.2 mmol L -1 calcium and 0.06 mmol L -1 manganese. © IWA Publishing 2012.

  2. Influence of groundwater composition on subsurface iron and arsenic removal

    KAUST Repository

    Moed, David H.

    2012-06-01

    Subsurface arsenic and iron removal (SAR/SIR) is a novel technology to remove arsenic, iron and other groundwater components by using the subsoil. This research project investigated the influence of the groundwater composition on subsurface treatment. In anoxic sand column experiments, with synthetic groundwater and virgin sand, it was found that several dissolved substances in groundwater compete for adsorption sites with arsenic and iron. The presence of 0.01 mmol L -1phosphate, 0.2 mmol L -1 silicate, and 1 mmol L -1 nitrate greatly reduced the efficiency of SAR, illustrating the vulnerability of this technology in diverse geochemical settings. SIR was not as sensitive to other inorganic groundwater compounds, though iron retardation was limited by 1.2 mmol L -1 calcium and 0.06 mmol L -1 manganese. © IWA Publishing 2012.

  3. Pinon Pine IGCC project status

    International Nuclear Information System (INIS)

    Higginbotham, E.B.; Lamarre, L.J.; Glazer, M.

    1993-01-01

    Sierra Pacific Power Company (SPPCo) intends to build the Pinon Pine Power Project, an integrated coal gasification combined cycle (IGCC) plant at its Tracy Power Station near Reno, Nevada. The plant will burn approximately 800 tons of coal per day to generate electricity in a base load application. The Pinon Project was selected by the U.S. Department of Energy (DOE) for funding under Round IV of the Clean Coal Technology Program. The project will demonstrate the use of the KRW agglomerating fluidized bed gasifer operating in the air blown mode. Hot gas cleanup consisting of particulate and sulfur removal will also be demonstrated. The Cooperative Agreement between SPPCo and the DOE was executed in August 1992. Foster Wheeler USA Corporation (FWUSA) will provide engineering and construction management services. The M.W. Kellogg Company (MWK) will provide engineering of the gasifer and hot gas cleanup systems. A discussion of project progress since the 1992 Clean Coal Technology Conference, design and economic considerations, and current project status is presented

  4. The Dismantling Project for the Large Electron Positron (LEP) Collider

    CERN Document Server

    Poole, John

    2002-01-01

    The LEP accelerator was installed in a circular tunnel 27 km in length with nine access points distributed around the circumference in the countryside and villages which surround CERN's sites. The dismantling project involved the removal in less than 15 months of around 29000 tonnes of equipment from the accelerator itself and a further 10000 tonnes from the four experiments - all of which were located at an average depth of 100 m below ground level. There was no contamination risk in the project and less than 3% of the materials removed were classified as radioactive. However, the materials which were classified as radioactive have to be temporarily stored and they consume considerable resources. The major difficulties for the project were in the establishment of the theoretical radiological zoning, implementation of the traceability systems and making appropriate radiation measurements to confirm the zoning. The absence of detailed guidelines from the French authorities, having no threshold levels for relea...

  5. The ALPHA project: A progress report

    International Nuclear Information System (INIS)

    Yadigaroglu, G.

    1995-01-01

    A review of the ALPHA project is presented, including a summary of progress and current status. The project comprises the experimental and analytical investigation of the long-term decay heat removal phenomena from the containment of the next generation of passive Advanced Light Water Reactors. In its present phase, the project is directed to the investigation of the Simplified Boiling Water Reactor (SBWR) Passive Containment Cooling system. The project includes separate-effects tests of containment phenomena (the LINX program). The effects of aerosols that may result from hypothetical severe accidents are also considered (the AIDA program). The construction and commissioning of the major ALPHA experimental facilities, PANDA, LINX-2 and AIDA is complete and the first series of tests are underway. Scaling studies have guided their design. Several small-scale experiments and studies have already produced valuable results

  6. Radioactive Air Emissions Notice of Construction (NOC) for the Solid Waste Treatment Facility (T Plant) Fuel Removal Project

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, R.E.

    2000-11-16

    This NOC describes the activities to remove all spent nuclear fuel (SNF) assemblies from the spent fuel pool in the T Plant Complex 221-T canyon for interim storage in the Canister Storage Building (CSB). The unabated total effective dose equivalent (TEDE) estimated for the public hypothetical maximally exposed individual (MEI) is 5.7 E-6 millirem (mrem) per year for this fuel removal NOC. The abated TEDE conservatively is estimated to account for 2.9 E-9 mrem per year to the MEI.

  7. Spent nuclear fuel project technical databook

    Energy Technology Data Exchange (ETDEWEB)

    Reilly, M.A.

    1998-07-22

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values.

  8. Spent nuclear fuel project technical databook

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1998-01-01

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values

  9. Environmental projects. Volume 14: Removal of contaminated soil and debris

    Science.gov (United States)

    Kushner, Len

    1992-01-01

    Numerous diverse activities at the Goldstone Deep Space Communications Complex (GDSCC) are carried out in support of six parabolic dish antennas. Some of these activities can result in possible spills or leakages of hazardous materials and wastes stored both above ground in steel drums and below ground in underground storage tanks (UST's). These possible leaks or spills, along with the past practice of burial of solid debris and waste in trenches and pits, could cause local subsurface contamination of the soil. In 1987, the Jet Propulsion Laboratory (JPL), retained Engineering-Science, Inc. (E-S), Pasadena, California, to identify the specific local areas within the GDSCC with subsurface soil contamination. The E-S study determined that some of the soils at the Apollo Site and the Mars Site were contaminated with hydrocarbons, while soil at a nonhazardous waste dumpsite at the Mojave Base site was contaminated with copper. This volume is a JPL-expanded version of the PE209 E-S report, and it also reports that all subsurface contaminated soils at the GDSCC were excavated, removed, and disposed of in an environmentally acceptable way, and the excavations were backfilled and covered in accordance with accepted Federal, State, and local environmental rules and regulations.

  10. PLANNING YOUR REMOVALS

    CERN Multimedia

    Service déménagement; ST Division

    1999-01-01

    To give you better service and avoid lengthy delays, the Removals Service advises you to refrain from programming moves between 26 July and 3 September, as large-scale removals are already planned during this summer period.Thanking you in advance for your co-operation and understanding.Removals Service STTel. 74185 / Mobile 164017

  11. Greenidge Multi-Pollutant Control Project

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel

    2008-10-18

    The Greenidge Multi-Pollutant Control Project was conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electric generating units (EGUs). There are about 400 units in the United States with capacities of 50-300 MW that currently are not equipped with selective catalytic reduction (SCR), flue gas desulfurization (FGD), or mercury control systems. Many of these units, which collectively represent more than 55 GW of installed capacity, are difficult to retrofit for deep emission reductions because of space constraints and unfavorable economies of scale, making them increasingly vulnerable to retirement or fuel switching in the face of progressively more stringent environmental regulations. The Greenidge Project sought to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs by offering a combination of deep emission reductions, low capital costs, small space requirements, applicability to high-sulfur coals, mechanical simplicity, and operational flexibility. The multi-pollutant control system includes a NO{sub x}OUT CASCADE{reg_sign} hybrid selective non-catalytic reduction (SNCR)/in-duct SCR system for NO{sub x} control and a Turbosorp{reg_sign} circulating fluidized bed dry scrubbing system (with a new baghouse) for SO{sub 2}, SO{sub 3}, HCl, HF, and particulate matter control. Mercury removal is provided as a co-benefit of the in-duct SCR, dry scrubber, and baghouse, and by injection of activated carbon upstream of the scrubber, if required. The multi-pollutant control system was installed and tested on the 107-MW{sub e}, 1953-vintage AES Greenidge Unit 4 by a team including

  12. AX Tank Farm tank removal study

    International Nuclear Information System (INIS)

    SKELLY, W.A.

    1998-01-01

    This report considers the feasibility of exposing, demolishing, and removing underground storage tanks from the 241-AX Tank Farm at the Hanford Site. For the study, it was assumed that the tanks would each contain 360 ft 3 of residual waste (corresponding to the one percent residual Inventory target cited in the Tri-Party Agreement) at the time of demolition. The 241-AX Tank Farm is being employed as a ''strawman'' in engineering studies evaluating clean and landfill closure options for Hanford single-shell tank farms. The report is one of several reports being prepared for use by the Hanford Tanks Initiative Project to explore potential closure options and to develop retrieval performance evaluation criteria for tank farms

  13. CHEMICAL SLUDGE HEEL REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT 8183

    International Nuclear Information System (INIS)

    Thaxton, D; Timothy Baughman, T

    2008-01-01

    Chemical Sludge Removal (CSR) is the final waste removal activity planned for some of the oldest nuclear waste tanks located at the Savannah River Site (SRS) in Aiken, SC. In 2008, CSR will be used to empty two of these waste tanks in preparation for final closure. The two waste tanks chosen to undergo this process have previously leaked small amounts of nuclear waste from the primary tank into an underground secondary containment pan. CSR involves adding aqueous oxalic acid to the waste tank in order to dissolve the remaining sludge heel. The resultant acidic waste solution is then pumped to another waste tank where it will be neutralized and then stored awaiting further processing. The waste tanks to be cleaned have a storage capacity of 2.84E+06 liters (750,000 gallons) and a target sludge heel volume of 1.89E+04 liters (5,000 gallons) or less for the initiation of CSR. The purpose of this paper is to describe the CSR process and to discuss the most significant technical issues associated with the development of CSR

  14. IAEA Helps Remove Highly Radioactive Material from Five South American Countries

    International Nuclear Information System (INIS)

    2018-01-01

    The International Atomic Energy Agency (IAEA) has helped remove 27 disused highly radioactive sources from five South American countries in a significant step forward for nuclear safety and security in the region. It was the largest such project ever facilitated by the IAEA. The material, mainly used for medical purposes such as treating cancer and sterilizing instruments, was transported to Germany and the United States for recycling. Canada, where some of the sources were manufactured, funded the project upon requests for IAEA support from Bolivia, Ecuador, Paraguay, Peru and Uruguay. The sealed Cobalt-60 and Caesium-137 sources pose safety and security risks when no longer in use, according to Raja Adnan, Director of the IAEA’s Division of Nuclear Security. “The removal of this large number of radioactive sources has significantly reduced those risks in the five countries,” Adnan said. In recent years, the IAEA has assisted Bosnia and Herzegovina, Cameroon, Costa Rica, Honduras, Lebanon, Morocco, Tunisia and Uzbekistan in the removal of disused sources. The South American operation was the largest the IAEA has so far coordinated in terms of both the number of highly radioactive sources and countries involved. While nuclear safety and security are national responsibilities, the IAEA helps Member States upon request to meet these responsibilities through training, technical advice, peer reviews and other advisory services. Such efforts may include support for Member States in implementing the safe and cost-effective recovery, conditioning, storage, disposal or transportation of disused sealed radioactive sources (DSRS).

  15. Removal of Shippingport Station primary system components and piping

    International Nuclear Information System (INIS)

    LaGuardia, T.S.; Lipsett, S.M.

    1987-01-01

    The dismantling workscope for the Shippingport Station Decommissioning Project was divided into subtasks to permit the work to be subcontracted to the maximum extent practicable. Major subtasks were identified and described by Activity specifications which could then be grouped into logical work packages to be put out for bid. Two of the largest dismantling work packages, removal of piping and components, were grouped together and designated as Activity Specifications 4 and 5. TLG Services, Inc. and Cleveland Wrecking Company formed a Joint Venture to perform this work during a two-year period at a cost of approximately $7 million. The major portions of this dismantling workscope are described. The primary system components within this workscope consist of the stainless steel reactor coolant piping, check valves, reactor coolant pumps, steam generators, and reactor purification demineralizers and coolers. The work performed, the heavy rigging preparations and procedures, the cutting tools used, component draining/capping techniques to prevent spills, contamination containment, airborne control techniques, and lessons learned during the removal of these primary system components are described. Summaries of crew size and composition, labor hours, duration hours and radiation exposure to workers are provided and discussed briefly. The successful completion of this work is evidence of the engineering, planning, equipment, materials and labor pool available to remove large, radioactively contaminated components safely. This experience will help decommissioning planners to prepare for the removal of reactor components in future decommissioning

  16. IGCC demonstration project status combustion engineering IGCC repowering project

    International Nuclear Information System (INIS)

    Glamuzina, R.W.; Allen, R.J.; Peletz, L.J.

    1993-01-01

    This demonstration project was originally conceived as the repowering of an existing plant facility, the Lakeside Station in Springfield, Illinois. The Owner, City Water, Light and Power (CWL ampersand P), has removed five of the original boilers and three of the original turbines. The buildings have had asbestos insulation removed and the interiors have been prepared for the construction of a single Integrated Gasification Combined Cycle (IGCC) process train that will generate a net output of 60 megawatts. The plant consists of a combined cycle (gas turbine, heat recovery steam generator, steam turbine) power train located in the existing buildings and a coal gasification system in a new building. The gasification system contains ABB CE's air-blown, entrained flow, two stage gasifier, an advanced hot gas desulfurization system by General Electric Environmental Services, Inc. and the necessary auxiliary systems. The plant is designed to produce a nominal 60 MW net output with an ambient air temperature of 95 degrees F and a cooling water temperature of 89 degrees F on either Natural Gas or Illinois No. 5 coal

  17. Protection of Human Beings Trafficked for the Purpose of Organ Removal: Recommendations.

    Science.gov (United States)

    Pascalev, Assya; Van Assche, Kristof; Sándor, Judit; Codreanu, Natalia; Naqvi, Anwar; Gunnarson, Martin; Frunza, Mihaela; Yankov, Jordan

    2016-02-01

    This report presents a comprehensive set of recommendations for protection of human beings who are trafficked for the purpose of organ removal or are targeted for such trafficking. Developed by an interdisciplinary group of international experts under the auspices of the project Trafficking in Human Beings for the Purpose of Organ Removal (also known as the HOTT project), these recommendations are grounded in the view that an individual who parts with an organ for money within an illegal scheme is ipso facto a victim and that the crime of trafficking in human beings for the purpose of organ removal (THBOR) intersects with the crime of trafficking in organs. Consequently, the protection of victims should be a priority for all actors involved in antitrafficking activities: those combating organ-related crimes, such as health organizations and survivor support services, and those combating trafficking in human beings, such as the criminal justice sectors. Taking into account the special characteristics of THBOR, the authors identify 5 key stakeholders in the protection of human beings trafficked for organ removal or targeted for such trafficking: states, law enforcement agencies and judiciary, nongovernmental organizations working in the areas of human rights and antitrafficking, transplant centers and health professionals involved in transplant medicine, and oversight bodies. For each stakeholder, the authors identify key areas of concern and concrete measures to identify and protect the victims of THBOR. The aim of the recommendations is to contribute to the development of a nonlegislative response to THBOR, to promote the exchange of knowledge and best practices in the area of victim protection, and to facilitate the development of a policy-driven action plan for the protection of THBOR victims in the European Union and worldwide.

  18. The Hague Recommendations: Improving Nonlegislative Responses to Trafficking in Human Beings for the Purpose of Organ Removal.

    Science.gov (United States)

    Ambagtsheer, Frederike; Weimar, Willem

    2016-02-01

    Over the years, the trade in human organs has become an object of international concern. Since the 1980s, antiorgan trade initiatives have mainly involved the strengthening of legislative responses. Little attention however is given to nonlegislative responses by law enforcement authorities. The HOTT project is a European Union-funded research project titled "trafficking in human beings for the purpose of organ removal." Its objectives are to increase knowledge, raise awareness, and improve the nonlegislative response to the crime. Its consortium organized a "Writers' Conference" in The Hague, The Netherlands at Europol's Headquarters where a group of 40 experts, consisting of transplant professionals, law enforcement officials, and policy makers, formulated recommendations to improve nonlegislative responses. These recommendations, presented hereafter, address the ethical and legal obligations of health care providers, the protection of persons trafficked for the purpose of organ removal, strengthening cross-border collaboration in criminal cases, and stimulating partnerships between transplant professionals and law enforcement. These recommendations offer ways in which transplant professionals can contribute to improving the nonlegislative response to trafficking in human beings for the purpose of organ removal.

  19. POSTERS FOR WORKSHOP ON EPA’S ARSENIC REMOVAL DEMONSTRATION PROGRAM: RESULTS AND LESSONS LEARNED.

    Science.gov (United States)

    The Workshop included posters on 21 different arsenic demonstration projects. Each poster included information on raw water quality, cost of the system, a schematic of the layout of the system and several graphs and tables on the performance of the system for the removal of arsen...

  20. GROWTH, MORTALITY AND PRODUCTION OF BROWN AND RAINBOW TROUT IN NEW MEXICO STREAMS

    Directory of Open Access Journals (Sweden)

    S Leiner

    1995-06-01

    Full Text Available Thirty-two representative trout sites in 15 high elevation New Mexico streams (1,661 - 2560 m above sea level were sampled in 1988 and 1989. Fish was captured by consecutive removal via electrofishing in net-blocked segments from 65 to 160 m long. Maximum estimated trout length (Lm.ax was related inversely to yield (r2 = 0.351; p = 0.055. Instantaneous rate of mortality was also marginally related to yield (r2 = 0.294. The production index ranged from 1,38 to 32.02 g/m2/year. Variation in production was highly correlated to trout biomass (r2 = 0.910. Trout growth and production were best defined by the relationships where: cover, stream width, water temperature, yield by anglers, LMAX, and nitrate-nitrogen concentration were included.

  1. Coastal habitat and biological community response to dam removal on the Elwha River

    Science.gov (United States)

    Foley, Melissa M.; Warrick, Jonathan A.; Ritchie, Andrew C.; Stevens, Andrew; Shafroth, Patrick B.; Duda, Jeff; Beirne, Matthew M.; Paradis, Rebecca; Gelfenbaum, Guy R.; McCoy, Randall; Cubley, Erin S.

    2017-01-01

    Habitat diversity and heterogeneity play a fundamental role in structuring ecological communities. Dam emplacement and removal can fundamentally alter habitat characteristics, which in turn can affect associated biological communities. Beginning in the early 1900s, the Elwha and Glines Canyon dams in Washington, USA, withheld an estimated 30 million tonnes of sediment from river, coastal, and nearshore habitats. During the staged removal of these dams—the largest dam removal project in history—over 14 million tonnes of sediment were released from the former reservoirs. Our interdisciplinary study in coastal habitats—the first of its kind—shows how the physical changes to the river delta and estuary habitats during dam removal were linked to responses in biological communities. Sediment released during dam removal resulted in over a meter of sedimentation in the estuary and over 400 m of expansion of the river mouth delta landform. These changes increased the amount of supratidal and intertidal habitat, but also reduced the influx of seawater into the pre-removal estuary complex. The effects of these geomorphic and hydrologic changes cascaded to biological systems, reducing the abundance of macroinvertebrates and fish in the estuary and shifting community composition from brackish to freshwater-dominated species. Vegetation did not significantly change on the delta, but pioneer vegetation increased during dam removal, coinciding with the addition of newly available habitat. Understanding how coastal habitats respond to large-scale human stressors—and in some cases the removal of those stressors—is increasingly important as human uses and restoration activities increase in these habitats.

  2. PROGRAMMING OFFICE REMOVALS

    CERN Multimedia

    Groupe ST-HM

    2000-01-01

    The Removals Service recommends you to plan your removals well in advance, taking into account the fact that the Transport and Handling Group’s main priority remains the dismantling of LEP and the installation of the LHC. The requests can be made by: http://st.web.cern.ch/st/hm/removal/DEMEE.HTM Thank you for your cooperation.

  3. Technical Approach for the Development of a Near Tank Cesium Removal Process

    International Nuclear Information System (INIS)

    Sams, T.L.; Miller, Ch.E.; Kurath, D.E.; Blanchard, D.L.

    2009-01-01

    Parsons has been selected for development of two Advanced Remediation Technology (ART) projects. One of these projects is the Near Tank Cesium Removal (NTCR) project. The NTCR system uses the same basic ion exchange approach for Cs removal that has been used for decades in the nuclear industry. The essential difference in this approach is the development of a modular, mobile design concept based on a simplified process employing an advanced resin media and the use of cool nitric acid for elution and heated nitric acid for resin digestion. Under these conditions, the NTCR process shows significant improvements over the baseline ion exchange technology. These improvements will allow DOE to deploy a NTCR, free up tank space and accelerate closure of SSTs prior to Waste Treatment Plant Pretreatment Facility startup (WTP PTF). Current estimates indicate that the Hanford tank farm system will run out of available storage space prior to startup of the WTP PTF currently scheduled for 2019. The lack of tank space will constrain the near-term goal of retrieving waste from single-shell tanks prior to full operation of the WTP. A deployment of an NTCR system will allow LAW processing to begin as soon as supplemental treatment (e.g. Bulk Vitrification) or the WTP LAW Vitrification Facility becomes available. The NTCR system is a self contained modular, transportable system that requires only limited process chemicals and separates the HLW into two process streams. Once the cesium is removed, the low activity waste stream can be vitrified. The high activity stream would be stored in the DST system until vitrified by the WTP High Level Waste (HLW) Facility. This technology can be sized to feed the WTP LAW melters at the nominal operating capacity (30 MT glass per day. Alternatively, it could be sized to feed a supplemental treatment system such the Bulk Vitrification process. The NTCR system is based on an elutable ion exchange system using the Spherical Resorcinol Formaldehyde

  4. Effect of multiple electro-fishing on determining the structure of fish communities in small streams

    Czech Academy of Sciences Publication Activity Database

    Humpl, Martin; Lusk, Stanislav

    2006-01-01

    Roč. 55, č. 3 (2006), s. 315-322 ISSN 0139-7893 R&D Projects: GA MŽP SM/6/3/05 Institutional research plan: CEZ:AV0Z60930519 Keywords : electro- fishing efficacy * repeated sampling * probability of detection * species richness Subject RIV: EH - Ecology, Behaviour Impact factor: 0.529, year: 2006 http://www.ivb.cz/folia/55/3/315-322.pdf

  5. Antelope--Fossil rebuild project

    International Nuclear Information System (INIS)

    1992-04-01

    The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration's (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower's Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project

  6. Decay heat removal and transient analysis in accidental conditions in the EFIT reactor

    International Nuclear Information System (INIS)

    Bandini, G.; Meloni, P.; Polidori, M.; Casamirra, M.; Castiglia, F.; Giardina, M.

    2007-01-01

    The development of a conceptual design of an industrial scale transmutation facility (EFIT) of several 100 MW thermal power based on Accelerator Driven System (ADS) is addressed in the frame of the European EUROTRANS Integral Project. In normal operation, the core power of EFIT reactor is removed through steam generators by four secondary loops fed by water. A safety-related Decay Heat Removal (DHR) system provided with four independent inherently safe loops is installed in the primary vessel to remove the decay heat by natural convection circulation under accidental conditions which lead to the Loss of Heat Sink (LOHS). In order to confirm the adequacy of the adopted solution for decay heat removal in accidental conditions, some multi-D analyses have been carried out with the SIMMER-III code. The results of the SIMMER-III code have been then used to support the RELAP5 1-D representation of the natural circulation flow paths in the reactor vessel. Finally, the thermal-hydraulic RELAP5 code has been employed for the analysis of LOHS accidental scenarios. (author)

  7. Decay Heat Removal and Transient Analysis in Accidental Conditions in the EFIT Reactor

    Directory of Open Access Journals (Sweden)

    Giacomino Bandini

    2008-01-01

    Full Text Available The development of a conceptual design of an industrial-scale transmutation facility (EFIT of several 100 MW thermal power based on accelerator-driven system (ADS is addressed in the frame of the European EUROTRANS Integral Project. In normal operation, the core power of EFIT reactor is removed through steam generators by four secondary loops fed by water. A safety-related decay heat removal (DHR system provided with four independent inherently safe loops is installed in the primary vessel to remove the decay heat by natural convection circulation under accidental conditions which are caused by a loss-of-heat sink (LOHS. In order to confirm the adequacy of the adopted solution for decay heat removal in accidental conditions, some multi-D analyses have been carried out with the SIMMER-III code. The results of the SIMMER-III code have been then used to support the RELAP5 1D representation of the natural circulation flow paths in the reactor vessel. Finally, the thermal-hydraulic RELAP5 code has been employed for the analysis of LOHS accidental scenarios.

  8. Removal kinetics of organic compounds and sum parameters under field conditions for managed aquifer recharge.

    Science.gov (United States)

    Wiese, Bernd; Massmann, Gudrun; Jekel, Martin; Heberer, Thomas; Dünnbier, Uwe; Orlikowski, Dagmar; Grützmacher, Gesche

    2011-10-15

    Managed aquifer recharge (MAR) provides efficient removal for many organic compounds and sum parameters. However, observed in situ removal efficiencies tend to scatter and cannot be predicted easily. In this paper, a method is introduced which allows to identify and eliminate biased samples and to quantify simultaneously the impact of (i) redox conditions (ii) kinetics (iii) residual threshold values below which no removal occurs and (iv) field site specifics. It enables to rule out spurious correlations between these factors and therefore improves the predictive power. The method is applied to an extensive database from three MAR field sites which was compiled in the NASRI project (2002-2005, Berlin, Germany). Removal characteristics for 38 organic parameters are obtained, of which 9 are analysed independently in 2 different laboratories. Out of these parameters, mainly pharmaceutically active compounds (PhAC) but also sum parameters and industrial chemicals, four compounds are shown to be readily removable whereas six are persistent. All partly removable compounds show a redox dependency and most of them reveal either kinetic dependencies or residual threshold values, which are determined. Differing removal efficiencies at different field sites can usually be explained by characteristics (i) to (iii). Copyright © 2011 Elsevier Ltd. All rights reserved.

  9. Jose Cabrera dismantling and decommissioning project

    International Nuclear Information System (INIS)

    Ondaro, Manuel

    2013-01-01

    The Jose Cabrera Nuclear Power Plant (NPP) was the first commercial power reactor (Westinghouse 1 loop PWR 510 MWth, 160 MWe) commissioned in Spain and provided the base for future development and training. The reactor construction started in 1963 and it was officially on-line by 1969. The NPP operated from 1969 until 2006 when it became the first reactor to be shut down after completing its operational period. The containment is reinforced concrete with a stainless steel head. In 2010 responsibility for D and D was transferred to Enresa to achieve IAEA level 3 (a green field site available for unrestricted re-uses) by 2017. Of the total of more than 104,000 tons of materials that will be generated during dismantling, it is estimated that only ∼4,000 tons will be radioactive waste, some of which, 40 t are considered as intermediate level long-lived wastes and the rest (3,960 t) will be categorized as VLLW and ILLW. The Project is divided into five phases: Phase 0 - Removal of fuel and preliminary work.. Phase 1 - Preparatory Activities for D and D. complete. Phase 2 - Dismantling of Major Components. Phase 3 - Removal of Auxiliary Installations, Decontamination and Demolition. Phase 4 - Environmental Restoration. Phase 2, is currently ongoing (50% completed). To manage the diverse aspects of decommissioning operations, Enresa uses an internally developed computerized project management tool. The tool, based on knowledge gathered from other Enresa projects, can process operations management, maintenance operations, materials, waste, storage areas, procedures, work permits, operator dose management and records. Enresa considers that communication is important for both internal and external stakeholder relations and can be used to inform, to neutralize negative opinions and attitudes, to remove false expectations and for training. Enresa has created a new multi-purpose area (exhibition/visitor centre) and encourages visits from the public, local schools, local and

  10. Jose Cabrera dismantling and decommissioning project

    Energy Technology Data Exchange (ETDEWEB)

    Ondaro, Manuel [ENRESA, Madrid (Spain)

    2013-07-01

    The Jose Cabrera Nuclear Power Plant (NPP) was the first commercial power reactor (Westinghouse 1 loop PWR 510 MWth, 160 MWe) commissioned in Spain and provided the base for future development and training. The reactor construction started in 1963 and it was officially on-line by 1969. The NPP operated from 1969 until 2006 when it became the first reactor to be shut down after completing its operational period. The containment is reinforced concrete with a stainless steel head. In 2010 responsibility for D and D was transferred to Enresa to achieve IAEA level 3 (a green field site available for unrestricted re-uses) by 2017. Of the total of more than 104,000 tons of materials that will be generated during dismantling, it is estimated that only ∼4,000 tons will be radioactive waste, some of which, 40 t are considered as intermediate level long-lived wastes and the rest (3,960 t) will be categorized as VLLW and ILLW. The Project is divided into five phases: Phase 0 - Removal of fuel and preliminary work.. Phase 1 - Preparatory Activities for D and D. complete. Phase 2 - Dismantling of Major Components. Phase 3 - Removal of Auxiliary Installations, Decontamination and Demolition. Phase 4 - Environmental Restoration. Phase 2, is currently ongoing (50% completed). To manage the diverse aspects of decommissioning operations, Enresa uses an internally developed computerized project management tool. The tool, based on knowledge gathered from other Enresa projects, can process operations management, maintenance operations, materials, waste, storage areas, procedures, work permits, operator dose management and records. Enresa considers that communication is important for both internal and external stakeholder relations and can be used to inform, to neutralize negative opinions and attitudes, to remove false expectations and for training. Enresa has created a new multi-purpose area (exhibition/visitor centre) and encourages visits from the public, local schools, local and

  11. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL PLANTS

    Science.gov (United States)

    This report documents a long term performance study of two iron removal water treatment plants to remove arsenic from drinking water sources. Performance information was collected from one system located in midwest for one full year and at the second system located in the farwest...

  12. Dam removal: Listening in

    Science.gov (United States)

    Foley, M. M.; Bellmore, J. R.; O'Connor, J. E.; Duda, J. J.; East, A. E.; Grant, G. E.; Anderson, C. W.; Bountry, J. A.; Collins, M. J.; Connolly, P. J.; Craig, L. S.; Evans, J. E.; Greene, S. L.; Magilligan, F. J.; Magirl, C. S.; Major, J. J.; Pess, G. R.; Randle, T. J.; Shafroth, P. B.; Torgersen, C. E.; Tullos, D.; Wilcox, A. C.

    2017-07-01

    Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad-scale ecological effects, and gives managers information needed to understand and predict long-term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (< 5 years) and do not adequately represent the diversity of dam types, watershed conditions, and dam-removal methods in the U.S.

  13. How stakeholders frame dam removal: The role of current and anticipated future ecosystem service use

    Science.gov (United States)

    Reilly, Kate; Adamowski, Jan

    2016-04-01

    Many river restoration projects, including dam removal, are controversial and can trigger conflicts between stakeholders who are for and against the proposed project. The study of environmental conflicts suggests that differences in how stakeholders 'frame', or make sense of a situation based on their prior knowledge and experiences, can perpetuate conflicts. Understanding different stakeholders' frames, particularly how they converge, can form the basis of successful conflict resolution. In the case of dam removals, it is often assumed that emphasising increased provision of ecosystem services can be a point of convergence between those advocating for ecological restoration and those opposed to removal because of negative human impacts. However, how exactly stakeholders frame a contentious proposed dam removal and how those frames relate to ecosystem services has been little studied. Here we used the case of a potential dam removal in New Brunswick to investigate how people frame the issue and how that relates to their current and anticipated future use of ecosystem services. Based on in-depth interviews with 30 stakeholders in the area, including both people for and against dam removal, we found that both groups currently used ecosystem services and were in favour of ecosystem protection. However, they differed in how they framed the issue of the potential dam removal. The group against dam removal framed the issue as one of loss and risk - they thought that any potential benefits to the ecosystem would be outweighed by the high risk of negative social impacts caused by a loss of access to ecosystem services, such as recreation and aesthetic enjoyment. By contrast, the group in favour of the dam framed the issue as one of opportunity and justice. They thought that following a short transition period, all stakeholders would benefit from the restored river, particularly from a restored salmon fishery, improved aesthetic appeal and the long-term sustainability of an

  14. Learning from Experience Case Studies of the Hyper-X Project

    Science.gov (United States)

    Peebles, Curtis

    2009-01-01

    The Hyper-X project (X-43A) provides a number of "lessons learned" which can be applied to other aerospace project. The specific areas examined were the selection of the goals of the Hyper-X. How the technical unknowns and assumptions were handled. The final lesson was the ambiguous nature of risk assessment, and how trying to remove a technical unknown can have unintended consequences.

  15. The Use of Reverse Osmosis for the Removal of As(III) and As(V) in Drinking Water

    OpenAIRE

    Garcia Ortiz, Christian Adriana

    2012-01-01

    The following thesis project was designed to collect data on the use of reverse osmosis for arsenic removal in drinking water and to explore economic methods for sample analysis with emphasis on the use of an ion exchange resin for arsenic speciation. The data collected was meant for verification of existing results, finding an optimal operating point for the reverse osmosis unit provided by Malthe Winje DWS, and to determine whether double filtration by reverse osmosis increases the removal ...

  16. Estimating Air Pollution Removal Through an Analysis of Vegetation Communities in Government Canyon State Natural Area

    Science.gov (United States)

    Medrano, Nicolas W.

    Ambient air pollution is a major issue in urban environments, causing negative health impacts and increasing costs for metropolitan economies. Vegetation has been shown to remove these pollutants at a substantial rate. This study utilizes the i-Tree Eco (UFORE) and i-Tree Canopy models to estimate air pollution removal services provided by trees in Government Canyon State Natural Area (GCSNA), an approximately 4,700 hectare area in San Antonio, Texas. For i-Tree Eco, a stratified project of the five prominent vegetation types was completed. A comparison of removal services provided by vegetation communities indicated there was no significant difference in removal rates. Total pollution removal of GCSNA was estimated to be 239.52 metric tons/year at a rate of 64.42 kg/ha of tree cover/year. By applying this value to the area within Bexar County, Texas belonging to the Balcones Canyonlands ecoregion, it was determined that for 2013 an estimated 2,598.45 metric tons/year of air pollution was removed at a health value to society of 19.4 million. This is a reduction in pollution removal services since 2003, in which 3,050.35 metric tons/year were removed at a health value of 22.8 million. These results suggest urban sprawl taking place in San Antonio is reducing air pollution removal services provided by trees.

  17. Modeling the Removal of Xenon from Lithium Hydrate with Aspen HYSYS

    Science.gov (United States)

    Efthimion, Phillip; Gentile, Charles

    2011-10-01

    The Laser Inertial Fusion Engine (LIFE) project mission is to provide a long-term, carbon-free source of sustainable energy, in the form of electricity. A conceptual xenon removal system has been modeled with the aid of Aspen HYSYS, a chemical process simulator. Aspen HYSYS provides excellent capability to model chemical flow processes, which generates outputs which includes specific variables such as temperature, pressure, and molar flow. The system is designed to strip out hydrogen isotopes deuterium and tritium. The base design bubbles plasma exhaust laden with x filled with liquid helium. The system separates the xenon from the hydrogen, deuterium, and tritium with a lithium hydrate and a lithium bubbler. After the removal of the hydrogen and its isotopes, the xenon is then purified by way of the process of cryogenic distillation. The pure hydrogen, deuterium, and tritium are then sent to the isotope separation system (ISS). The removal of xenon is an integral part of the laser inertial fusion engine and Aspen HYSYS is an excellent tool to calculate how to create pure xenon.

  18. The relative influence of electrokinetic remediation design on the removal of As, Cu, Pb and Sb from shooting range soils

    DEFF Research Database (Denmark)

    Pedersen, Kristine B.; Jensen, Pernille Erland; Ottosen, Lisbeth M.

    2018-01-01

    to simultaneously optimise the removal by applying a stirred set-up, placement of the anode directly in the soil suspension, sieving the soil (analysis is a valuable tool for evaluating remediation measures depending soil...... and analysis was applied for assessing the efficiency of electrodialytic remediation treatment and variable importance varied for each of the studied metals. In general, applying a stirred set-up improved the metal removal, acidification time and reduced the energy consumption. The placement of the anode...... directly in the soil did not significantly influence the removal of Al, Mg, Mn, As and Pb, while moderately influencing the removal of Cu. Multivariate analysis (projections onto latent structures) revealed similar variable importance and optimal settings for removal of Cu and Pb. It is hence possible...

  19. The Timber Resource Inventory Model (TRIM): a projection model for timber supply and policy analysis.

    Science.gov (United States)

    P.L. Tedder; R.N. La Mont; J.C. Kincaid

    1987-01-01

    TRIM (Timber Resource Inventory Model) is a yield table projection system developed for timber supply projections and policy analysis. TRIM simulates timber growth, inventories, management and area changes, and removals over the projection period. Programs in the TRIM system, card-by-card descriptions of required inputs, table formats, and sample results are presented...

  20. Preliminary study of the decay heat removal strategy for the gas demonstrator allegro

    Energy Technology Data Exchange (ETDEWEB)

    Mayer, Gusztáv, E-mail: gusztav.mayer@energia.mta.hu [Hungarian Academy of Sciences, Centre for Energy Research, P.O. Box 49, H-1525 Budapest (Hungary); Bentivoglio, Fabrice, E-mail: fabrice.bentivoglio@cea.fr [CEA/DEN/DM2S/STMF/LMES, F-38054, Grenoble (France)

    2015-05-15

    Highlights: • Improved decay heat removal strategy was adapted for the 75 MW ALLEGRO MOX core. • New nitrogen injection strategy was proposed for the DEC LOCA transients. • Preliminary CATHARE study shows that most of the investigated transients fulfill criteria. • Further improvements and optimizations are needed for nitrogen injection. - Abstract: The helium cooled Gas Fast Reactor (GFR) is one of the six reactor concepts selected in the frame of the Generation IV International Forum. Since no gas cooled fast reactor has ever been built, a medium power demonstrator reactor – named ALLEGRO – is necessary on the road towards the 2400 MWth GFR power reactor. The French Commissariat à l’Energie Atomique (CEA) completed a wide range of studies during the early stage of development of ALLEGRO, and later the ALLEGRO reactor concept was developed in several European Union projects in parallel with the GFR2400. The 75 MW thermal power ALLEGRO is currently developed in the frame of the European ALLIANCE project. As a result of the collaboration between CEA and the Hungarian Academy of Sciences Centre for Energy Research (MTA EK) new improvements were done in the safety approach of ALLEGRO. A complete Decay Heat Removal (DHR) strategy was devised, relying on the primary circuits as a first way to remove decay heat using pony-motors to drive the primary blowers, and on the secondary and tertiary circuits being able to work in forced or natural circulation. Three identical dedicated loops circulating in forced convection are used as a second way to remove decay heat, and these loops can circulate in natural convection for pressurized transients, providing a third way to remove decay heat in case of accidents when the primary circuit is still under pressure. The possibility to use nitrogen to enhance both forced and natural circulation is discussed. This DHR strategy is supported by a wide range of accident transient simulations performed using the CATHARE2 code

  1. Plate removal following orthognathic surgery.

    Science.gov (United States)

    Little, Mhairi; Langford, Richard Julian; Bhanji, Adam; Farr, David

    2015-11-01

    The objectives of this study are to determine the removal rates of orthognathic plates used during orthognathic surgery at James Cook University Hospital and describe the reasons for plate removal. 202 consecutive orthognathic cases were identified between July 2004 and July 2012. Demographics and procedure details were collected for these patients. Patients from this group who returned to theatre for plate removal between July 2004 and November 2012 were identified and their notes were analysed for data including reason for plate removal, age, smoking status, sex and time to plate removal. 3.2% of plates were removed with proportionally more plates removed from the mandible than the maxilla. 10.4% of patients required removal of one or more plate. Most plates were removed within the first post-operative year. The commonest reasons for plate removal were plate exposure and infection. The plate removal rates in our study are comparable to those seen in the literature. Copyright © 2015 European Association for Cranio-Maxillo-Facial Surgery. Published by Elsevier Ltd. All rights reserved.

  2. Shippingport Station Decommissioning Project (SSDP). A progress report

    International Nuclear Information System (INIS)

    Mullee, G.R.; Usher, J.M.

    1986-01-01

    The Shippingport Atomic Power Station was shutdown in October, 1982 by the Plant Operator, Duquesne Light Company, for decommissioning by the US Department of Energy. The planning for decommissioning was completed in September, 1983. In September, 1984 operational responsibility for the station was transferred to the DOE's Decommissioning Operations Contractor - the General Electric Company (assisted by an integrated subcontractor, MK Ferguson Company). Significant accomplishments to date include the completion of all prerequisites for decommissioning, the removal of asbestos from plant systems, loading of irradiated reactor components into the reactor vessel for shipment, the commencement of electrical deactivations and the commencement of piping/component removal. Decontamination and waste processing are progressing in support of the project schedule. The reactor vessel will be shipped as one piece on a barge for burial at Hanford, Washington. The final release of the site is scheduled for April, 1990. A technology transfer program is being utilized to disseminate information about the project

  3. Los Alamos National Laboratory TRU waste sampling projects

    International Nuclear Information System (INIS)

    Yeamans, D.; Rogers, P.; Mroz, E.

    1997-01-01

    The Los Alamos National Laboratory (LANL) has begun characterizing transuranic (TRU) waste in order to comply with New Mexico regulations, and to prepare the waste for shipment and disposal at the Waste Isolation Pilot Plant (WIPP), near Carlsbad, New Mexico. Sampling consists of removing some head space gas from each drum, removing a core from a few drums of each homogeneous waste stream, and visually characterizing a few drums from each heterogeneous waste stream. The gases are analyzed by GC/MS, and the cores are analyzed for VOC's and SVOC's by GC/MS and for metals by AA or AE spectroscopy. The sampling and examination projects are conducted in accordance with the ''DOE TRU Waste Quality Assurance Program Plan'' (QAPP) and the ''LANL TRU Waste Quality Assurance Project Plan,'' (QAPjP), guaranteeing that the data meet the needs of both the Carlsbad Area Office (CAO) of DOE and the ''WIPP Waste Acceptance Criteria, Rev. 5,'' (WAC)

  4. Design alternatives report for the cesium removal demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Walker, J.F. Jr.; Youngblood, E.L.

    1995-09-01

    The Cesium Removal Demonstration (CRD) project will use liquid low-level waste (LLLW) stored in the Oak Ridge National Laboratory Melton Valley Storage Tanks to demonstrate cesium removal from sodium nitrate-based supernates. This report presents the results of a conceptual design study to scope the alternatives for conducting the demonstration at ORNL. Factors considered included (1) sorbent alternatives, (2) facility alternatives, (3) process alternatives, (4) process disposal alternatives, and (5) relative cost comparisons. Recommendations included (1) that design of the CRD system move forward based on information obtained to date from tests with Savannah River Resin, (2) that the CRD system be designed so it could use crystalline silicotitanates (CST) if an engineered form of CST becomes available prior to the CRD, (3) that the system be designed without the capability for resin regeneration, (4) that the LLLW solidification facility be used for the demonstration (5) that vitrification of the loaded resins from the CRD be demonstrated at the Savannah River Site, and (6) that permanent disposal of the loaded and/or vitrified resin at the Nevada Test Site be pursued.

  5. Design alternatives report for the cesium removal demonstration

    International Nuclear Information System (INIS)

    Walker, J.F. Jr.; Youngblood, E.L.

    1995-09-01

    The Cesium Removal Demonstration (CRD) project will use liquid low-level waste (LLLW) stored in the Oak Ridge National Laboratory Melton Valley Storage Tanks to demonstrate cesium removal from sodium nitrate-based supernates. This report presents the results of a conceptual design study to scope the alternatives for conducting the demonstration at ORNL. Factors considered included (1) sorbent alternatives, (2) facility alternatives, (3) process alternatives, (4) process disposal alternatives, and (5) relative cost comparisons. Recommendations included (1) that design of the CRD system move forward based on information obtained to date from tests with Savannah River Resin, (2) that the CRD system be designed so it could use crystalline silicotitanates (CST) if an engineered form of CST becomes available prior to the CRD, (3) that the system be designed without the capability for resin regeneration, (4) that the LLLW solidification facility be used for the demonstration (5) that vitrification of the loaded resins from the CRD be demonstrated at the Savannah River Site, and (6) that permanent disposal of the loaded and/or vitrified resin at the Nevada Test Site be pursued

  6. Experiments on aerosol removal by high-pressure water spray

    Energy Technology Data Exchange (ETDEWEB)

    Corno, Ada del, E-mail: delcorno@rse-web.it [RSE, Power Generation Technologies and Materials Dept, via Rubattino 54, I-20134 Milano (Italy); Morandi, Sonia, E-mail: morandi@rse-web.it [RSE, Power Generation Technologies and Materials Dept, via Rubattino 54, I-20134 Milano (Italy); Parozzi, Flavio, E-mail: parozzi@rse-web.it [RSE, Power Generation Technologies and Materials Dept, via Rubattino 54, I-20134 Milano (Italy); Araneo, Lucio, E-mail: lucio.araneo@polimi.it [Politecnico di Milano, Department of Energy, via Lambruschini 4A, I-20156 Milano (Italy); CNR-IENI, via Cozzi 53, I-20125 Milano (Italy); Casella, Francesco, E-mail: francesco2.casella@mail.polimi.it [Politecnico di Milano, Department of Energy, via Lambruschini 4A, I-20156 Milano (Italy)

    2017-01-15

    Highlights: • Experimental research to measure the efficiency of high-pressure sprays in capturing aerosols if applied to a filtered containment venting system in case of severe accident. • Cloud of monodispersed SiO{sub 2} particles with sizes 0.5 or 1.0 μm and initial concentration in the range 2–90 mg/m{sup 3}. • Carried out in a chamber 0.5 × 1.0 m and 1.5 m high, with transparent walls equipped with a high pressure water spray with single nozzle. • Respect to low-pressure sprays, removal efficiency turned out significant: the half-life for 1 μm particles with a removal high-pressure spray system is orders of magnitude shorter than that with a low-pressure sprays system. - Abstract: An experimental research was managed in the framework of the PASSAM European Project to measure the efficiency of high-pressure sprays in capturing aerosols when applied to a filtered containment venting system in case of severe accident. The campaign was carried out in a purposely built facility composed by a scrubbing chamber 0.5 × 1.0 m and 1.5 m high, with transparent walls to permit the complete view of the aerosol removal process, where the aerosol was injected to form a cloud of specific particle concentration. The chamber was equipped with a high pressure water spray system with a single nozzle placed on its top. The test matrix consisted in the combination of water pressure injections, in the range 50–130 bar, on a cloud of monodispersed SiO{sub 2} particles with sizes 0.5 or 1.0 μm and initial concentration ranging between 2 and 99 mg/m{sup 3}. The spray was kept running for 2 min and the efficiency of the removal was evaluated, along the test time, using an optical particle sizer. With respect to low-pressure sprays, the removal efficiency turned out much more significant: the half-life for 1 μm particles with a removal high-pressure spray system is orders of magnitude shorter than that with a low-pressure spray system. The highest removal rate was

  7. Experiments on aerosol removal by high-pressure water spray

    International Nuclear Information System (INIS)

    Corno, Ada del; Morandi, Sonia; Parozzi, Flavio; Araneo, Lucio; Casella, Francesco

    2017-01-01

    Highlights: • Experimental research to measure the efficiency of high-pressure sprays in capturing aerosols if applied to a filtered containment venting system in case of severe accident. • Cloud of monodispersed SiO_2 particles with sizes 0.5 or 1.0 μm and initial concentration in the range 2–90 mg/m"3. • Carried out in a chamber 0.5 × 1.0 m and 1.5 m high, with transparent walls equipped with a high pressure water spray with single nozzle. • Respect to low-pressure sprays, removal efficiency turned out significant: the half-life for 1 μm particles with a removal high-pressure spray system is orders of magnitude shorter than that with a low-pressure sprays system. - Abstract: An experimental research was managed in the framework of the PASSAM European Project to measure the efficiency of high-pressure sprays in capturing aerosols when applied to a filtered containment venting system in case of severe accident. The campaign was carried out in a purposely built facility composed by a scrubbing chamber 0.5 × 1.0 m and 1.5 m high, with transparent walls to permit the complete view of the aerosol removal process, where the aerosol was injected to form a cloud of specific particle concentration. The chamber was equipped with a high pressure water spray system with a single nozzle placed on its top. The test matrix consisted in the combination of water pressure injections, in the range 50–130 bar, on a cloud of monodispersed SiO_2 particles with sizes 0.5 or 1.0 μm and initial concentration ranging between 2 and 99 mg/m"3. The spray was kept running for 2 min and the efficiency of the removal was evaluated, along the test time, using an optical particle sizer. With respect to low-pressure sprays, the removal efficiency turned out much more significant: the half-life for 1 μm particles with a removal high-pressure spray system is orders of magnitude shorter than that with a low-pressure spray system. The highest removal rate was detected with 1

  8. Highland Uranium Solution Mining Project. Draft environmental statement

    International Nuclear Information System (INIS)

    1978-05-01

    Exxon Minerals Co. proposes to conduct production-scale solution mining (in situ leaching) of uranium within the existing Highland Operation area in Converse County, Wyoming. The project would result in the temporary removal of 200 acres from grazing and the actual disturbance of 50 acres. About 4500 acre-ft of water will be withdrawn from the ore zone aquifer over the 10-year life of the project. There will be no discharge of liquid effluents from the project; atmospheric effluents will be within acceptable limits. Radiation doses at the nearest ranch resulting from solution mining activities were estimated. The project proposes the production and utilization of 1 to 3 million lb of uranium resources. It will not produce any significant socioeconomic impact on the local area. Alternatives to the project were considered, and conditions for issuing the source material license are listed

  9. Accounting for Incomplete Species Detection in Fish Community Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    McManamay, Ryan A [ORNL; Orth, Dr. Donald J [Virginia Polytechnic Institute and State University; Jager, Yetta [ORNL

    2013-01-01

    Riverine fish assemblages are heterogeneous and very difficult to characterize with a one-size-fits-all approach to sampling. Furthermore, detecting changes in fish assemblages over time requires accounting for variation in sampling designs. We present a modeling approach that permits heterogeneous sampling by accounting for site and sampling covariates (including method) in a model-based framework for estimation (versus a sampling-based framework). We snorkeled during three surveys and electrofished during a single survey in suite of delineated habitats stratified by reach types. We developed single-species occupancy models to determine covariates influencing patch occupancy and species detection probabilities whereas community occupancy models estimated species richness in light of incomplete detections. For most species, information-theoretic criteria showed higher support for models that included patch size and reach as covariates of occupancy. In addition, models including patch size and sampling method as covariates of detection probabilities also had higher support. Detection probability estimates for snorkeling surveys were higher for larger non-benthic species whereas electrofishing was more effective at detecting smaller benthic species. The number of sites and sampling occasions required to accurately estimate occupancy varied among fish species. For rare benthic species, our results suggested that higher number of occasions, and especially the addition of electrofishing, may be required to improve detection probabilities and obtain accurate occupancy estimates. Community models suggested that richness was 41% higher than the number of species actually observed and the addition of an electrofishing survey increased estimated richness by 13%. These results can be useful to future fish assemblage monitoring efforts by informing sampling designs, such as site selection (e.g. stratifying based on patch size) and determining effort required (e.g. number of

  10. Phosphorus removal using a microalgal biofilm in a new biofilm photobioreactor for tertiary wastewater treatment

    Czech Academy of Sciences Publication Activity Database

    Sukačová, Kateřina; Trtílek, M.; Rataj, Tomáš

    2015-01-01

    Roč. 75, mar (2015), s. 55-63 ISSN 0043-1354 R&D Projects: GA MŠk(CZ) ED1.1.00/02.0073 Institutional support: RVO:67179843 Keywords : microalgal biofilm * phosphorus removal * wastewater treatment Subject RIV: EH - Ecology, Behaviour Impact factor: 5.991, year: 2015

  11. Principal Features of Tetrapropylammonium Hydroxide Removal Kinetics from Silicalite-1 in Quasi-isothermal Heating Regimes

    Czech Academy of Sciences Publication Activity Database

    Prokopová, Olga; Bernauer, B.; Fryčová, Marie; Hrabánek, Pavel; Zikánová, Arlette; Kočiřík, Milan

    2013-01-01

    Roč. 117, č. 3 (2013), s. 1468-1476 ISSN 1932-7447 R&D Projects: GA ČR(CZ) GAP204/11/1206 Institutional support: RVO:61388955 Keywords : MFI-TYPE ZEOLITES * THERMAL-DECOMPOSITION * TEMPLATE REMOVAL Subject RIV: CF - Physical ; Theoretical Chemistry Impact factor: 4.835, year: 2013

  12. Hot-Gas Filter Ash Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Swanson, M.L.; Hurley, J.P.; Dockter, B.A.; O`Keefe, C.A.

    1997-07-01

    Large-scale hot-gas filter testing over the past 10 years has revealed numerous cases of cake buildup on filter elements that has been difficult, if not impossible, to remove. At times, the cake can blind or bridge between candle filters, leading to filter failure. Physical factors, including particle-size distribution, particle shape, the aerodynamics of deposition, and system temperature, contribute to the difficulty in removing the cake, but chemical factors such as surface composition and gas-solid reactions also play roles in helping to bond the ash to the filters or to itself. This project is designed to perform the research necessary to determine the fuel-, sorbent-, and operations-related conditions that lead to blinding or bridging of hot-gas particle filters. The objectives of the project are threefold: (1) Determine the mechanisms by which a difficult-to-clean ash is formed and how it bridges hot-gas filters (2) Develop a method to determine the rate of bridging based on analyses of the feed coal and sorbent, filter properties, and system operating conditions and (3) Suggest and test ways to prevent filter bridging.

  13. Calculation of pollutant removal during groundwater restoration with adsorption and ion exchange

    International Nuclear Information System (INIS)

    Charbeneau, R.J.

    1982-01-01

    A technique is presented for calculating pollutant removal rates during groundwater restoration processes. The hydraulic information required by the method is obtained from the conservative tracer breakthrough curve for a flow system. The influence of adsorption and ion exchange chemistry on species transport is included through application of the method of characteristics. The combined result gives the effluent concentration at a production well as a function of time during a restoration project. The method is applicable for any well pattern and its economy is such that a pencil and paper calculation will suffice for yielding quantitative answers for complex flow problems. The method is applied to calculate ammonium removal rates for site restoration by recirculation with chemical sweeps following in situ leach mining of uranium

  14. PCB-Caulk Replacement Project Johnson Space Center Houston, TX

    Science.gov (United States)

    Young, William M.; Stanch, Penney M.; Molenda, William

    2011-01-01

    Wet method reduced exposure by minimizing overall respirable particulate release. Dry method didn't introduce delays for primer/caulk application. Removed caulks came in many forms, from dry powdery to tarry sticky. Varying textures were not sampled or packaged differently. During the course of the project, EPA modified recommended practices to include full containment for exterior caulk removal. Changes are ongoing. Initial recommendations were directed to school buildings. EPA is researching risks due to caulk. Exposure guidance lacking except for 2 of 209 PCB congeners. Work was safely completed on schedule and under budget.

  15. Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, R.H. [Westinghouse Savannah River Company, AIKEN, SC (United States); Oji, L.N.

    1997-11-14

    Under the Tritium Facility Modernization {ampersand} Consolidation (TFM{ampersand}C) Project (S-7726) at the Savannah River Site (SS), all tritium processing operations in Building 232-H, with the exception of extraction and obsolete/abandoned systems, will be reestablished in Building 233-H. These operations include hydrogen isotopic separation, loading and unloading of tritium shipping and storage containers, tritium recovery from zeolite beds, and stripping of nitrogen flush gas to remove tritium prior to stack discharge. The scope of the TFM{ampersand}C Project also provides for a new replacement R&D tritium test manifold in 233-H, upgrading of the 233- H Purge Stripper and 233-H/234-H building HVAC, a new 234-H motor control center equipment building and relocating 232-H Materials Test Facility metallurgical laboratories (met labs), flow tester and life storage program environment chambers to 234-H.

  16. Fuel transfer system ALARA design review - Project A.15

    International Nuclear Information System (INIS)

    KUEBERTH, L.R.

    2001-01-01

    One mission of the Spent Nuclear Fuel (SNF) Project is to move the SNF from the K Basins in the Hanford 100K Area to an interim dry storage at the Canister Storage Building (CSB) in the Hanford 200 East Area. The Fuel Transfer System (FTS) is a subproject that will move the SNF from the 105K East (KE) Facility to the 105K West (KW) Facility. The SNF will be treated for shipment to the Cold Vacuum Drying (CVD) facility at the KW Basin. The SNF canisters will be loaded underwater into a Shielded Transfer Cask (STC) in the KE Basin. The fully loaded STC will be brought out of the water and placed into a Cask Transfer Overpack (CTO) by the STC Straddle Carrier. As the STC is removed from the water, it will be washed down with demineralized water by an manual rinse system. The CTO with the STC inside will be placed on a transport trailer and transferred to the KW Basin as an intra-facility transfer. The CTO will be unloaded from the shipping trailer at the KW Basin and the STC will be removed from the CTO. The STC will then be lowered into the KW Basin water and the fuel will be removed. The SNF will then be processed for shipment to the CVD. As soon as all of the fuel has been removed from the STC, the cask will be removed from the KW Basin water and placed into the CTO. The CTO will again be placed on the trailer for transport back to the KE Basin where the entire cycle will be repeated approximately 400 times. This document records the As Low As Reasonably Achievable (ALARA) findings and design recommendations/requirements by the SNF Project noted during the Final Design Review of the STC, CTO, STC Transfer System, Annexes and Roadways for support of FTS. This document is structured so that all statements that include the word ''shall'' represent design features that have been or will be implemented within the project scope. Statements that include the words ''should'' or ''recommend'' represent ALARA design features to be evaluated for future implementation

  17. Optimizing winter/snow removal operations in MoDOT St. Louis district : includes outcome based evaluation of operations.

    Science.gov (United States)

    2011-10-01

    The objective of this project was to develop fleet location, route decision, material selection, and treatment procedures for winter snow removal operations to improve MoDOTs services and lower costs. This work uses a systematic, heuristic-based o...

  18. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status of project to date January 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fourth year (1996) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). The fourth year at the Weldon Springs Site shows sustained progress as the project moves through the final design and into the remedial action phases of the Chemical Plant Operable Unit. The remedial action phase includes the Foundations Removal work package, Chemical Solidification and Stabilization, and disposal cell

  19. The Hague Recommendations: Improving Nonlegislative Responses to Trafficking in Human Beings for the Purpose of Organ Removal

    Science.gov (United States)

    Ambagtsheer, Frederike; Weimar, Willem

    2016-01-01

    Abstract Over the years, the trade in human organs has become an object of international concern. Since the 1980s, antiorgan trade initiatives have mainly involved the strengthening of legislative responses. Little attention however is given to nonlegislative responses by law enforcement authorities. The HOTT project is a European Union-funded research project titled “trafficking in human beings for the purpose of organ removal.” Its objectives are to increase knowledge, raise awareness, and improve the nonlegislative response to the crime. Its consortium organized a “Writers' Conference” in The Hague, The Netherlands at Europol's Headquarters where a group of 40 experts, consisting of transplant professionals, law enforcement officials, and policy makers, formulated recommendations to improve nonlegislative responses. These recommendations, presented hereafter, address the ethical and legal obligations of health care providers, the protection of persons trafficked for the purpose of organ removal, strengthening cross-border collaboration in criminal cases, and stimulating partnerships between transplant professionals and law enforcement. These recommendations offer ways in which transplant professionals can contribute to improving the nonlegislative response to trafficking in human beings for the purpose of organ removal. PMID:27500254

  20. Estimating asbestos abatement projects: Excellence or 'You said I missed what'?

    International Nuclear Information System (INIS)

    Frawley, R.F.

    1992-01-01

    Between 1900 and 1980, 30 million tons of asbestos were put in place. Because of the known health hazards and increasing federal, state, and local regulations, building owners are now facing the problem of asbestos abatement. There are 4 basic approaches to dealing with asbestos: (1) removal, (2) enclosure, (3) encapsulation, (4) deferred action in conjunction with a well defined operations and maintenance program. Once the full extent of the problem is determined, the decision can be made on which action or combination of actions to take and begin estimating the cost of the asbestos abatement project. There are no high-tech methods of asbestos removal. It is hot, wet, labor intensive work, the ways of removal are archaic. Removal means man power and man hours, labor is a big ticket item, and is an important factor in cost estimating. Become very familiar with the scope of the project and be sure to fully understand the depth of the asbestos problem. The products, supplies, tools, and in some cases, the machines are all disposable items. If one overlooks something or underestimates the time involved for removal, not only will one be way off on material, the labor costs will soar. Be very observant on walk throughs, notice everything. Be sure to get clear, accurate test results on material to be removed. Once all this is done, one can make a good take off with confidence. Finally, when in doubt always remember the 11th commandment of asbestos abatement cost-estimating 'If thou can't figure it out hor-ellipsis thou best figure it in.'

  1. Tail production and removal. Risk, challenges and possibilities

    International Nuclear Information System (INIS)

    Magelssen, Hans Chr.

    1997-01-01

    Elf is one of the companies with the longest experience as an oil operator in Norway. This presentation discusses experiences made by Elf on tail production and removal. It starts with a description of risk, economic analyses and individual cash flow discounting and then deals with the challenges and possibilities of extended use of existing installations. Elf does not use individual cash flow discounting, which has several disadvantages, but rather traditional indicators like NPV (Net Present Value), IRR (Internal Rate of Return), payback time and balance price calculated by means of cash flow, as well as a type of ROI (Return On Investment). In normal present value calculation, the decision-maker estimates the total risk for the project and compare this with a relevant present value. Another method is proposed if it is desirable to include risk directly in calculating the present value. In this method the present value is shown as a probability distribution. A probability curve is associated with the most important variables. Some of Elf's experience with tail production and removal policy is described. The tail production from a gas field is a great challenge for the operator of the field, but the other actors should also be concerned with this part of a field's lifetime. So far there is no absolute requirement that large platforms must be removed. The presentations end with some discussion about economy and production policies for the final years of a field. 3 figs

  2. Spider Vein Removal

    Science.gov (United States)

    Spider veins: How are they removed? I have spider veins on my legs. What options are available ... M.D. Several options are available to remove spider veins — thin red lines or weblike networks of ...

  3. Possibilities of Mercury Removal in the Dry Flue Gas Cleaning Lines of Solid Waste Incineration Units

    Czech Academy of Sciences Publication Activity Database

    Svoboda, Karel; Hartman, Miloslav; Šyc, Michal; Pohořelý, Michael; Kameníková, Petra; Jeremiáš, Michal; Durda, Tomáš

    2016-01-01

    Roč. 166, JAN 15 (2016), s. 499-511 ISSN 0301-4797 R&D Projects: GA TA ČR TE02000236 Institutional support: RVO:67985858 Keywords : waste incineration * mercury removal * flue gas Subject RIV: CI - Industrial Chemistry, Chemical Engineering Impact factor: 4.010, year: 2016

  4. Hair removal in adolescence

    Directory of Open Access Journals (Sweden)

    Sandra Pereira

    2015-06-01

    Full Text Available Introduction: Due to hormonal stimulation during puberty, changes occur in hair type and distribution. In both sexes, body and facial unwanted hair may have a negative psychological impact on the teenager. There are several available methods of hair removal, but the choice of the most suitable one for each individual can raise doubts. Objective: To review the main methods of hair removal and clarify their indications, advantages and disadvantages. Development: There are several removal methods currently available. Shaving and depilation with chemicals products are temporary methods, that need frequent repetition, because hair removal is next to the cutaneous surface. The epilating methods in which there is full hair extraction include: epilation with wax, thread, tweezers, epilating machines, laser, intense pulsed light, and electrolysis. Conclusions: The age of beginning hair removal and the method choice must be individualized and take into consideration the skin and hair type, location, dermatological and endocrine problems, removal frequency, cost and personal preferences.

  5. Plasma hearth process demonstration project

    International Nuclear Information System (INIS)

    Geimer, R.M.; Gillins, R.L.

    1995-01-01

    The Plasma Hearth Process (PHP) demonstration project is one of the key technology projects in the US Department of Energy (DOE) Office of Technology Development Mixed Waste Focus Area. The PHP is a high temperature thermal treatment process using a plasma arc torch in a stationary, refractory lined chamber that destroys organics and stabilizes the residuals in a nonleaching, vitrified waste form, greatly improving the disposability of the waste. This paper describes the PHP system and summarizes test results to date, including volume reduction, destruction and removal efficiencies for organic wastes, and emission characteristics. Tests performed so far demonstrate that the PHP adresses DOE mixed waste final waste form requirements and US Environmental Protection Agency Toxicity Characteristic Leaching Procedure requirements

  6. Removing arsenic from groundwater in Cambodia using high performance iron adsorbent.

    Science.gov (United States)

    Kang, Y; Takeda, R; Nada, A; Thavarith, L; Tang, S; Nuki, K; Sakurai, K

    2014-09-01

    In Cambodia, groundwater has been contaminated with arsenic, and purification of the water is an urgent issue. From 2010 to 2012, an international collaborative project between Japan and Cambodia for developing arsenic-removing technology from well water was conducted and supported by the foundation of New Energy and Industrial Technology Development Organization, Japan. Quality of well water was surveyed in Kandal, Prey Veng, and Kampong Cham Provinces, and a monitoring trial of the arsenic removal equipment using our patented amorphous iron (hydr)oxide adsorbent was performed. Of the 37 wells surveyed, arsenic concentration of 24 exceeded the Cambodian guideline value (50 μg L(-1)), and those of 27 exceeded the WHO guideline for drinking water (10 μg L(-1)). Levels of arsenic were extremely high in some wells (>1,000-6,000 μg L(-1)), suggesting that arsenic pollution of groundwater is serious in these areas. Based on the survey results, 16 arsenic removal equipments were installed in six schools, three temples, two health centers, four private houses, and one commune office. Over 10 months of monitoring, the average arsenic concentrations of the treated water were between 0 and 10 μg L(-1) at four locations, 10-50 μg L(-1) at eight locations, and >50 μg L(-1) at four locations. The arsenic removal rate ranged in 83.1-99.7%, with an average of 93.8%, indicating that the arsenic removal equipment greatly lower the risk of arsenic exposure to the residents. Results of the field trial showed that As concentration of the treated water could be reduced to condition. This is one of the succeeding As removal techniques that could reduce As concentration of water below the WHO guideline value for As in situ.

  7. Geomorphic and habitat response to a large-dam removal in a Mediterranean river

    Science.gov (United States)

    Harrison, L.; East, A. E.; Smith, D. P.; Bond, R.; Logan, J. B.; Nicol, C.; Williams, T.; Boughton, D. A.; Chow, K.

    2017-12-01

    The presence of large dams has fundamentally altered physical and biological processes in riverine ecosystems, and dam removal is becoming more common as a river restoration strategy. We used a before-after-control-impact study design to investigate the geomorphic and habitat response to removal of 32-m-high San Clemente Dam on the Carmel River, CA. The project represents the first major dam removal in a Mediterranean river and is also unique among large dam removals in that most reservoir sediment was sequestered in place. We found that in the first year post-removal, a sediment pulse migrated 3.5 km downstream, filling pools and the interstitial pore spaces of gravels with sand. These sedimentary and topographic changes initially reduced the overall quality of steelhead (O. mykiss) spawning and rearing habitat in impacted reaches. Over the second winter after dam removal, a sequence of high flows flushed large volumes of sand from pools and mobilized the river bed throughout much of the active channel. The floods substantially altered fluvial evolution in the upper part of the reservoir, promoting new avulsion and the subsequent delivery of gravel and large wood to below dam reaches. These geomorphic processes increased the availability of spawning-sized gravel and enhanced channel complexity in reaches within several km of the former dam, which should improve habitat for multiple life stages of steelhead. Results indicate that when most reservoir sediment remains impounded, high flows become more important drivers of geomorphic and habitat change than dam removal alone. In such cases, the rates at which biophysical processes are reestablished will depend largely on post-dam removal flow sequencing and the upstream supply of sediment and large wood.

  8. Liquid Nitrogen Removal of Critical Aerospace Materials

    Science.gov (United States)

    Noah, Donald E.; Merrick, Jason; Hayes, Paul W.

    2005-01-01

    Identification of innovative solutions to unique materials problems is an every-day quest for members of the aerospace community. Finding a technique that will minimize costs, maximize throughput, and generate quality results is always the target. United Space Alliance Materials Engineers recently conducted such a search in their drive to return the Space Shuttle fleet to operational status. The removal of high performance thermal coatings from solid rocket motors represents a formidable task during post flight disassembly on reusable expended hardware. The removal of these coatings from unfired motors increases the complexity and safety requirements while reducing the available facilities and approved processes. A temporary solution to this problem was identified, tested and approved during the Solid Rocket Booster (SRB) return to flight activities. Utilization of ultra high-pressure liquid nitrogen (LN2) to strip the protective coating from assembled space shuttle hardware marked the first such use of the technology in the aerospace industry. This process provides a configurable stream of liquid nitrogen (LN2) at pressures of up to 55,000 psig. The performance of a one-time certification for the removal of thermal ablatives from SRB hardware involved extensive testing to ensure adequate material removal without causing undesirable damage to the residual materials or aluminum substrates. Testing to establish appropriate process parameters such as flow, temperature and pressures of the liquid nitrogen stream provided an initial benchmark for process testing. Equipped with these initial parameters engineers were then able to establish more detailed test criteria that set the process limits. Quantifying the potential for aluminum hardware damage represented the greatest hurdle for satisfying engineers as to the safety of this process. Extensive testing for aluminum erosion, surface profiling, and substrate weight loss was performed. This successful project clearly

  9. Investigations to increase the efficiency of fluorine and boron removal from groundwater using radiation-induced graft polymerization adsorbent

    International Nuclear Information System (INIS)

    Iyatomi, Yosuke; Shimada, Akiomi; Ogata, Nobuhisa; Sugihara, Kozo; Hoshina, Hiroyuki; Seko, Noriaki; Kasai, Noboru; Ueki, Yuji; Tamada, Masao

    2010-01-01

    The Japan Atomic Energy Agency is performing a research project in the Mizunami Underground Research Laboratory (MIU) to build a firm scientific and technological basis for the studies of the deep underground environment in crystalline rock. In the project, it is necessary to reduce the fluorine and boron concentrations in groundwater pumped from the MIU shafts to levels below the environmental standards. This is done at the MIU water treatment facility using coagulation and ion exchange treatment for fluorine and boron, respectively. In addition, in 2006, research started on the efficient treatment of groundwater for removal of fluorine and boron using a radiation-induced graft polymerization adsorbent. The adsorbent removed boron at a flow rate (space velocity (SV)=120 h -1 ) higher than that of a general ion exchange resin (SV=10 h -1 ) and the adsorbent could be used repeatedly. It was also apparent that the pH of groundwater had an influence on adsorption performance. With respect to fluorine removal, more than 90% of fluorine was removed. However, the adsorbent for fluorine showed a lower adsorption capacity than that for boron. The reason for this difference is considered to be related to the initial concentration difference between fluorine and boron in the groundwater. Therefore, it is necessary to define the initial concentrations of dissolved materials, which can be used as better indicators of the performance of the adsorbent. (author)

  10. Contaminated concrete scabbling at the Shippingport station decommissioning project

    International Nuclear Information System (INIS)

    Bauer, R.G.

    1989-01-01

    The Shippingport atomic power station was the first commercial nuclear power plant in the United States, joining the Duquesne Light Company (DLC) grid in December 1957. The Shippingport station was shut down in October 1982 and defueled in preparation for dismantling. On September 6, 1984, the Shippingport Station Decommissioning Project (SSDP) office of the US Department of Energy (DOE) assumed responsibility for the site. At turnover, there were several areas in the plant where radioactive contamination was entrained in concrete surfaces. The removal of contaminated concrete at SSDP was an important part of the decontamination to meet site release criteria, which is a major consideration in the decommissioning of nuclear power reactors. The highlights of this activity include: (1) development and application of remote scabbling tools, which effectively removed the contaminated concrete surfaces, and (2) use of scabblers minimized the removal of noncontaminated concrete by removing shallow layers of the surface and contributed to waste control, since the waste form enabled good packaging efficiency

  11. Regulatory compliance issues related to the White Oak Creek Embayment time-critical removal action

    International Nuclear Information System (INIS)

    Leslie, M.; Kimmel, B.L.

    1991-01-01

    In September 1990, Martin Marietta Energy Systems (Energy Systems) discovered high levels of Cesium-137 ( 137 Cs) in surface sedimenus near the mouth of White Oak Creek Embayment (WOCE). White Oak Creek (WOC) receives surface water drainage from Oak Ridge National Laboratory. Since this discovery, the Department of Energy (DOE) and Energy Systems have pursued actions designed to stabilize the contaminated WOCE sediments under provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), and the implementing regulations in the National Contingency Plan (NCP) (40 CFR Part 300), as a time-critical removal action. By definition, a time-critical removal is an action where onsite activities are initiated within six months of the determination that a removal action is appropriate. Time-critical removal actions allow comparatively rapid mobilization to protect human health and the environment without going through the lengthy and extensive CERCLA Remedial Investigation/Feasibility Study/Record of Decision process. Many aspects of the project, in terms of compliance with the substantive requirements of the NCP and ARARs, have exceeded the regulatory requirements, despite the fact that there is no apparent authority on conducting removal actions at Federal facilities. Much of the interpretation of the NCP was groundbreaking in nature for both EPA and DOE. 4 refs., 2 figs

  12. The High Luminosity LHC Project

    Science.gov (United States)

    Rossi, Lucio

    The High Luminosity LHC is one of the major scientific project of the next decade. It aims at increasing the luminosity reach of LHC by a factor five for peak luminosity and a factor ten in integrated luminosity. The project, now fully approved and funded, will be finished in ten years and will prolong the life of LHC until 2035-2040. It implies deep modifications of the LHC for about 1.2 km around the high luminosity insertions of ATLAS and CMS and relies on new cutting edge technologies. We are developing new advanced superconducting magnets capable of reaching 12 T field; superconducting RF crab cavities capable to rotate the beams with great accuracy; 100 kA and hundred meter long superconducting links for removing the power converter out of the tunnel; new collimator concepts, etc... Beside the important physics goals, the High Luminosity LHC project is an ideal test bed for new technologies for the next hadron collider for the post-LHC era.

  13. Assessment of the Cast Stone Low-Temperature Waste Form Technology Coupled with Technetium Removal - 14379

    Energy Technology Data Exchange (ETDEWEB)

    Brown, Christopher F.; Rapko, Brian M.; Serne, R. Jeffrey; Westsik, Joseph H.; Cozzi, Alex; Fox, Kevin M.; Mccabe, Daniel J.; Nash, C. A.; Wilmarth, William R.

    2014-03-03

    The U.S. Department of Energy Office of Environmental Management (EM) is engaging the national laboratories to provide the scientific and technological rigor to support EM program and project planning, technology development and deployment, project execution, and assessment of program outcomes. As an early demonstration of this new responsibility, Pacific Northwest National Laboratory (PNNL) and Savannah River National Laboratory (SRNL) were chartered to implement a science and technology program addressing low-temperature waste forms for immobilization of DOE aqueous waste streams, including technetium removal as an implementing technology. As a first step, the laboratories examined the technical risks and uncertainties associated with the Cast Stone waste immobilization and technetium removal projects at Hanford. Science and technology gaps were identified for work associated with 1) conducting performance assessments and risk assessments of waste form and disposal system performance, and 2) technetium chemistry in tank wastes and separation of technetium from waste processing streams. Technical approaches to address the science and technology gaps were identified and an initial sequencing priority was suggested. A subset of research was initiated in 2013 to begin addressing the most significant science and technology gaps. The purpose of this paper is to report progress made towards closing these gaps and provide notable highlights of results achieved to date.

  14. COD removal from pulp and paper effluents by Advanced Oxidation Processes (AOP); COD:n vaehentaeminen aop-menetelmaellae metsaeteollisuuden jaetevesistae - EKY 04

    Energy Technology Data Exchange (ETDEWEB)

    Jansson, K.; Wikberg, H. [Kemira Chemicals Oy, Vaasa (Finland)

    1998-12-31

    The aim of this project is to develop a process where COD from pulp and paper industry can be removed by an AOP process. AOP is a process utilizing the oxidation power of the hydroxyl radical, which can be produced in many different ways. Compared to evaporation and membrane techniques, the benefits of this process are lack of condense, concentrate and sludge. It is a very simple process, based on adjusting the COD removal by means of hydrogen peroxide dosage. The study focuses on using heterogeneous catalyst together with hydrogen peroxide to produce hydroxyl radicals in order to remove COD at low temperatures (< 100 deg C) and normal pressures. The project started by screening catalysts able to perform this task in laboratory scale. Later on pilot scale equipment will be constructed for use in pulp and paper mill trials. The project will be carried out during 1997-1999. The study started by screening the possibilities of different catalysts together with hydrogen peroxide to remove phenols from a model water. Sofar, about hundred catalysts have been screened. These tests show that many of the heterogeneous catalysts are working, but most of them have actually dissolved in the water and `translated` to homogenous catalysts. This means that they cannot be used in this project. A few catalysts have been found to meet the targets for synthetic phenol waters. Next step will be to test these catalysts on actual water samples from pulp and paper mills, and after that a pilot and full-scale trial will be planned. In these trials we will find out which mill streams are possible to treat, and the cost/performances of a system totally based on the catalyst in use. Also, measurements of catalyst leaching and clogging will be made during these tests. The last test series is planned to be a full-scale trial. (orig.)

  15. COD removal from pulp and paper effluents by Advanced Oxidation Processes (AOP); COD:n vaehentaeminen aop-menetelmaellae metsaeteollisuuden jaetevesistae - EKY 04

    Energy Technology Data Exchange (ETDEWEB)

    Jansson, K; Wikberg, H [Kemira Chemicals Oy, Vaasa (Finland)

    1999-12-31

    The aim of this project is to develop a process where COD from pulp and paper industry can be removed by an AOP process. AOP is a process utilizing the oxidation power of the hydroxyl radical, which can be produced in many different ways. Compared to evaporation and membrane techniques, the benefits of this process are lack of condense, concentrate and sludge. It is a very simple process, based on adjusting the COD removal by means of hydrogen peroxide dosage. The study focuses on using heterogeneous catalyst together with hydrogen peroxide to produce hydroxyl radicals in order to remove COD at low temperatures (< 100 deg C) and normal pressures. The project started by screening catalysts able to perform this task in laboratory scale. Later on pilot scale equipment will be constructed for use in pulp and paper mill trials. The project will be carried out during 1997-1999. The study started by screening the possibilities of different catalysts together with hydrogen peroxide to remove phenols from a model water. Sofar, about hundred catalysts have been screened. These tests show that many of the heterogeneous catalysts are working, but most of them have actually dissolved in the water and `translated` to homogenous catalysts. This means that they cannot be used in this project. A few catalysts have been found to meet the targets for synthetic phenol waters. Next step will be to test these catalysts on actual water samples from pulp and paper mills, and after that a pilot and full-scale trial will be planned. In these trials we will find out which mill streams are possible to treat, and the cost/performances of a system totally based on the catalyst in use. Also, measurements of catalyst leaching and clogging will be made during these tests. The last test series is planned to be a full-scale trial. (orig.)

  16. Project management plan for Project W-178, 219-S secondary containment

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1995-01-01

    This Project Management Plan (PMP) establishes the organizational responsibilities, control systems, and procedures for managing the execution of project activities for Project W-178, the 219-S Secondary Containment Upgrade. The scope of this project will provide the 219-S Facility with secondary containment for all tanks and piping systems. Tank 103 will be replaced with a new tank which will be designated as Tank 104. Corrosion protection shall be installed as required. The cells shall be cleaned and the surface repaired as required. The 219-S Waste Handling Facility (219-S Facility), located in the 200 West Area, was constructed in 1951 to support the 222-S Laboratory Facility. The 219-S Facility has three tanks, TK-101, TK-102, and TK-103, which receive and neutralize low level radioactive wastes from the 222-S Laboratory. For purposes of the laboratory, the different low level waste streams have been designated as high activity and intermediate activity. The 219-S Facility accumulates and treats the liquid waste prior to transferring it to SY Tank Farm in the 200-W Area. Transfers are normally made by pipeline from the 219-S Facility to the 241-SY Tank Farm. Presently transfers are being made by tanker truck to the 200-E Area Tank Farms due to the diversion box catch tank which has been removed from service

  17. Optical hair removal.

    Science.gov (United States)

    Ort, R J; Anderson, R R

    1999-06-01

    Traditional methods of hair removal have proven unsatisfactory for many individuals with excessive or unwanted hair. In the last few years, several lasers and xenon flashlamps have been developed that promise to fulfill the need for a practical, safe, and long-lasting method of hair removal. Aggressive marketing of these has contributed to their popularity among patients and physicians. However, significant controversy and confusion surrounds this field. This article provides a detailed explanation of the scientific underpinnings for optical hair removal and explores the advantages and disadvantages of the various devices currently available (Nd:YAG, ruby, alexandrite, diode lasers, and xenon flashlamp). Treatment and safety guidelines are provided to assist the practitioner in the use of these devices. Although the field of optical hair removal is still in its infancy, initial reports of long-term efficacy are encouraging.

  18. AX Tank Farm tank removal study

    Energy Technology Data Exchange (ETDEWEB)

    SKELLY, W.A.

    1999-02-24

    This report examines the feasibility of remediating ancillary equipment associated with the 241-AX Tank Farm at the Hanford Site. Ancillary equipment includes surface structures and equipment, process waste piping, ventilation components, wells, and pits, boxes, sumps, and tanks used to make waste transfers to/from the AX tanks and adjoining tank farms. Two remedial alternatives are considered: (1) excavation and removal of all ancillary equipment items, and (2) in-situ stabilization by grout filling, the 241-AX Tank Farm is being employed as a strawman in engineering studies evaluating clean and landfill closure options for Hanford single-shell tanks. This is one of several reports being prepared for use by the Hanford Tanks Initiative Project to explore potential closure options and to develop retrieval performance evaluation criteria for tank farms.

  19. Particle adhesion and removal

    CERN Document Server

    Mittal, K L

    2015-01-01

    The book provides a comprehensive and easily accessible reference source covering all important aspects of particle adhesion and removal.  The core objective is to cover both fundamental and applied aspects of particle adhesion and removal with emphasis on recent developments.  Among the topics to be covered include: 1. Fundamentals of surface forces in particle adhesion and removal.2. Mechanisms of particle adhesion and removal.3. Experimental methods (e.g. AFM, SFA,SFM,IFM, etc.) to understand  particle-particle and particle-substrate interactions.4. Mechanics of adhesion of micro- and  n

  20. Upgrading of Wastewater Treatment Plants Through the Use of Unconventional Treatment Technologies: Removal of Lidocaine, Tramadol, Venlafaxine and Their Metabolites

    Directory of Open Access Journals (Sweden)

    Wilhelm Püttmann

    2012-09-01

    Full Text Available The occurrence and removal efficiencies of the pharmaceuticals lidocaine (LDC, tramadol (TRA and venlafaxine (VEN, and their major active metabolites monoethylglycinexylidide (MEGX, O-desmethyltramadol (ODT and O-desmethylvenlafaxine (ODV were studied at four wastewater treatment plants (WWTPs equipped with activated sludge treatment technologies. In parallel to activated sludge treatment, the removal efficiency of the compounds in pilot- and full-scale projects installed at the WWTPs was investigated. Within these projects two different treatment methods were tested: adsorption onto powdered/granulated activated carbon (PAC/GAC and ozonation. The metabolite MEGX was not detected in any sample. The concentrations of the target analytes in wastewater effluents resulting from activated sludge treatment ranged from 55 to 183 (LDC, 88 to 416 (TRA, 50 to 245 (ODT, 22 to 176 (VEN and 77 to 520 ng L−1 (ODV. In the pilot project with subsequent treatment with PAC/GAC, the mean concentrations of the analytes were between

  1. Enewetak radiological support project. Final report

    International Nuclear Information System (INIS)

    Friesen, B.

    1982-09-01

    From 1972 through 1980, the Department of Energy acted in an advisory role to the Defense Nuclear Agency during planning for and execution of the cleanup of Enewetak Atoll. The Nevada Operations Office of the Department of Energy was responsible for the radiological characterization of the atoll and for certification of radiological condition of each island upon completion of the project. In-situ measurements of gamma rays emitted by americium-241 were utilized along with wet chemistry separation of plutonium from soil samples to identify and delineate surface areas requiring removal of soil. Military forces removed over 100,000 cubic yards of soil from the surface of five islands and deposited this material in a crater remaining from the nuclear testing period. Subsurface soil was excavated and removed from several locations where measurements indicated the presence of radionuclides above predetermined criteria. The methodologies of data acquisition, analysis and interpretation are described and detailed results are provided in text, figures and microfiche. The final radiological condition of each of 43 islets is reported

  2. Hair Removal

    DEFF Research Database (Denmark)

    Hædersdal, Merete

    2011-01-01

    Hair removal with optical devices has become a popular mainstream treatment that today is considered the most efficient method for the reduction of unwanted hair. Photothermal destruction of hair follicles constitutes the fundamental concept of hair removal with red and near-infrared wavelengths...... suitable for targeting follicular and hair shaft melanin: normal mode ruby laser (694 nm), normal mode alexandrite laser (755 nm), pulsed diode lasers (800, 810 nm), long-pulse Nd:YAG laser (1,064 nm), and intense pulsed light (IPL) sources (590-1,200 nm). The ideal patient has thick dark terminal hair......, white skin, and a normal hormonal status. Currently, no method of lifelong permanent hair eradication is available, and it is important that patients have realistic expectations. Substantial evidence has been found for short-term hair removal efficacy of up to 6 months after treatment with the available...

  3. Hair removal

    DEFF Research Database (Denmark)

    Haedersdal, Merete; Haak, Christina S

    2011-01-01

    Hair removal with optical devices has become a popular mainstream treatment that today is considered the most efficient method for the reduction of unwanted hair. Photothermal destruction of hair follicles constitutes the fundamental concept of hair removal with red and near-infrared wavelengths...... suitable for targeting follicular and hair shaft melanin: normal mode ruby laser (694 nm), normal mode alexandrite laser (755 nm), pulsed diode lasers (800, 810 nm), long-pulse Nd:YAG laser (1,064 nm), and intense pulsed light (IPL) sources (590-1,200 nm). The ideal patient has thick dark terminal hair......, white skin, and a normal hormonal status. Currently, no method of lifelong permanent hair eradication is available, and it is important that patients have realistic expectations. Substantial evidence has been found for short-term hair removal efficacy of up to 6 months after treatment with the available...

  4. WERF Nutrient Challenge investigates limits of nutrient removal technologies.

    Science.gov (United States)

    Neethling, J B; Clark, D; Pramanik, A; Stensel, H D; Sandino, J; Tsuchihashi, R

    2010-01-01

    The WERF Nutrient Challenge is a multi-year collaborative research initiative established in 2007 to develop and provide current information about wastewater treatment nutrients (specifically nitrogen and phosphorus in wastewater), their characteristics, and bioavailability in aquatic environments to help regulators make informed decisions. The Nutrient Challenge will also provide data on nutrient removal so that treatment facilities can select sustainable, cost-effective methods and technologies to meet permit limits. To meet these goals, the Nutrient Challenge has teamed with a wide array of utilities, agencies, consultants, universities and other researchers and practitioners to collaborate on projects that advance these goals. The Nutrient Challenge is focusing on a different approach to collaborating and leveraging resources (financial and intellectual) on research projects by targeting existing projects and research that correspond with its goals and funding those aspects that the Nutrient Challenge identified as a priority. Because the Nutrient Challenge is focused on collaboration, outreach is an absolutely necessary component of its effectiveness. Through workshops, webinars, a web portal and online compendium, published papers, and conference lectures, the Nutrient Challenge is both presenting important new information, and soliciting new partnerships.

  5. Instrument validation project

    International Nuclear Information System (INIS)

    Reynolds, B.A.; Daymo, E.A.; Geeting, J.G.H.; Zhang, J.

    1996-06-01

    Westinghouse Hanford Company Project W-211 is responsible for providing the system capabilities to remove radioactive waste from ten double-shell tanks used to store radioactive wastes on the Hanford Site in Richland, Washington. The project is also responsible for measuring tank waste slurry properties prior to injection into pipeline systems, including the Replacement of Cross-Site Transfer System. This report summarizes studies of the appropriateness of the instrumentation specified for use in Project W-211. The instruments were evaluated in a test loop with simulated slurries that covered the range of properties specified in the functional design criteria. The results of the study indicate that the compact nature of the baseline Project W-211 loop does not result in reduced instrumental accuracy resulting from poor flow profile development. Of the baseline instrumentation, the Micromotion densimeter, the Moore Industries thermocouple, the Fischer and Porter magnetic flow meter, and the Red Valve Pressure transducer meet the desired instrumental accuracy. An alternate magnetic flow meter (Yokagawa) gave nearly identical results as the baseline fischer and Porter. The Micromotion flow meter did not meet the desired instrument accuracy but could potentially be calibrated so that it would meet the criteria. The Nametre on-line viscometer did not meet the desired instrumental accuracy and is not recommended as a quantitative instrument although it does provide qualitative information. The recommended minimum set of instrumentation necessary to ensure the slurry meets the Project W-058 acceptance criteria is the Micromotion mass flow meter and delta pressure cells

  6. Removal of radium from drinking water

    International Nuclear Information System (INIS)

    Lauch, R.P.

    1992-08-01

    The report summarizes processes for removal of radium from drinking water. Ion exchange, including strong acid and weak acid resin, is discussed. Both processes remove better than 95 percent of the radium from the water. Weak acid ion exchange does not add sodium to the water. Calcium cation exchange removes radium and can be used when hardness removal is not necessary. Iron removal processes are discussed in relation to radium removal. Iron oxides remove much less than 20 percent of the radium from water under typical conditions. Manganese dioxide removes radium from water when competition for sorption sites and clogging of sites is reduced. Filter sand that is rinsed daily with dilute acid will remove radium from water. Manganese dioxide coated filter sorption removes radium but more capacity would be desirable. The radium selective complexer selectively removes radium with significant capacity if iron fouling is eliminated

  7. Removal site evaluation report on the Tower Shielding Facility at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    This removal site evaluation report for the Tower Shielding Facility (TSF) at Oak Ridge National Laboratory was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the Tower Shielding Facility pose a substantial risk to human health or the environment (i.e., a high probability of adverse effects) and if remedial site evaluations or removal actions are, therefore, required. The scope of the project included a review of historical evidence regarding operations and use of the facility; interviews with facility personnel concerning current and past operating practices; a site inspection; and identification of hazard areas requiring maintenance, removal, or remedial actions. Based an the findings of this removal site evaluation, adequate efforts are currently being made at the TSF to contain and control existing contamination and hazardous substances on site in order to protect human health and the environment No conditions requiring maintenance or removal actions to mitigate imminent or potential threats to human health and the environment were identified during this evaluation. Given the current conditions and status of the buildings associated with the TSF, this removal site evaluation is considered complete and terminated according to the requirements for removal site evaluation termination

  8. After-heat removing device

    International Nuclear Information System (INIS)

    Iwashige, Kengo; Otsuka, Masaya; Yokoyama, Iwao; Yamakawa, Masanori.

    1990-01-01

    The present invention concerns an after-heat removing device for first reactors. A heat accumulation portion provided in a cooling channel of an after-heat removing device is disposed before a coil-like heat conduction pipe for cooling of the after-heat removing device. During normal reactor operation, the temperature in the heat accumulation portion is near the temperature of the high temperature plenum due to heat conduction and heat transfer from the high temperature plenum. When the reactor is shutdown and the after-heat removing device is started, coolants cooled in the air cooler start circulation. The coolants arriving at the heat accumulation portion deprive heat from the heat accumulation portion and, ion turn, increase their temperature and then reach the cooling coil. Subsequently, the heat calorie possessed in the heat accumulation portion is reduced and the after-heat removing device is started for the operation at a full power. This can reduce the thermal shocks applied to the cooling coil or structures in a reactor vessel upon starting the after-heat removing device. (I.N.)

  9. Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)

    International Nuclear Information System (INIS)

    Hsu, R.H.; Oji, L.N.

    1997-01-01

    Under the Tritium Facility Modernization ampersand Consolidation (TFM ampersand C) Project (S-7726) at the Savannah River Site (SS), all tritium processing operations in Building 232-H, with the exception of extraction and obsolete/abandoned systems, will be reestablished in Building 233-H. These operations include hydrogen isotopic separation, loading and unloading of tritium shipping and storage containers, tritium recovery from zeolite beds, and stripping of nitrogen flush gas to remove tritium prior to stack discharge. The scope of the TFM ampersand C Project also provides for a new replacement R ampersand D tritium test manifold in 233-H, upgrading of the 233- H Purge Stripper and 233-H/234-H building HVAC, a new 234-H motor control center equipment building and relocating 232-H Materials Test Facility metallurgical laboratories (met labs), flow tester and life storage program environment chambers to 234-H

  10. Optimization of the Carbon Dioxide Removal Assembly (CDRA-4EU) in Support of the International Space System and Advanced Exploration Systems

    Science.gov (United States)

    Knox, James C.; Stanley, Christine M.

    2015-01-01

    The Life Support Systems Project (LSSP) under the Advanced Exploration Systems (AES) program builds upon the work performed under the AES Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project focusing on the numerous technology development areas. The Carbon Dioxide (CO2) removal and associated air drying development efforts are focused on improving the current state-of-the-art system on the International Space Station (ISS) utilizing fixed beds of sorbent pellets by seeking more robust pelletized sorbents, evaluating structured sorbents, and examining alternate bed configurations to improve system efficiency and reliability. A component of the CO2 removal effort utilizes a virtual Carbon Dioxide Removal Assembly, revision 4 (CDRA-4) test bed to test a large number of potential operational configurations with independent variations in flow rate, cycle time, heater ramp rate, and set point. Initial ground testing will provide prerequisite source data and provide baseline data in support of the virtual CDRA. Once the configurations with the highest performance and lowest power requirements are determined by the virtual CDRA, the results will be confirmed by testing these configurations with the CDRA-4EU ground test hardware. This paper describes the initial ground testing of select configurations. The development of the virtual CDRA under the AES-LSS Project will be discussed in a companion paper.

  11. Arsenic and Nitrate Removal from Drinking Water by Ion Exchange U.S. EPA Demonstration Project at Vale, OR - Final Performance Evaluation Report

    Science.gov (United States)

    As part of the EPA Arsenic Removal Technology Demonstration Program, a 540-gal/min (gpm) ion exchange (IX) system proposed by Kinetico was selected for demonstration at Vale, OR to remove arsenic and nitrate from a groundwater supply to meet their respective maximum contaminant l...

  12. A project of X-ray hardening correction in large ICT

    International Nuclear Information System (INIS)

    Fang Min; Liu Yinong; Ni Jianping

    2005-01-01

    This paper presents a means of polychromatic X-ray beam hardening correction using a standard function to transform the polychromatic projection to monochromatic projection in large Industrial Computed Tomography (ICT). Some parameters were defined to verify the validity of hardening correction in large ICT and optimized. Simulated experiments were used to prove that without prior knowledge of the composition of the scanned object, the correction method using monochromatic reconstruction arithmetic could remove beam hardening artifact greatly. (authors)

  13. Wholesale debris removal from LEO

    Science.gov (United States)

    Levin, Eugene; Pearson, Jerome; Carroll, Joseph

    2012-04-01

    Recent advances in electrodynamic propulsion make it possible to seriously consider wholesale removal of large debris from LEO for the first time since the beginning of the space era. Cumulative ranking of large groups of the LEO debris population and general limitations of passive drag devices and rocket-based removal systems are analyzed. A candidate electrodynamic debris removal system is discussed that can affordably remove all debris objects over 2 kg from LEO in 7 years. That means removing more than 99% of the collision-generated debris potential in LEO. Removal is performed by a dozen 100-kg propellantless vehicles that react against the Earth's magnetic field. The debris objects are dragged down and released into short-lived orbits below ISS. As an alternative to deorbit, some of them can be collected for storage and possible in-orbit recycling. The estimated cost per kilogram of debris removed is a small fraction of typical launch costs per kilogram. These rates are low enough to open commercial opportunities and create a governing framework for wholesale removal of large debris objects from LEO.

  14. Q-switched laser tattoo removal

    Directory of Open Access Journals (Sweden)

    Viljem H. topčič

    2013-10-01

    Full Text Available Background: Decorative tattooing gained popularity in many western countries throughout the 1990s. Some estimates show that approximately 10 % of men in the United States already have tattoos. However, tattoos often become a personal regret. As recent surveys suggest, 17 % of people that have obtained a tattoo and more than 50 % of adults over the age of 40 in the United States of America consider having them removed. The same trend can be observed in our country as well. Laser therapy is the gold standard for tattoo removal. In Slovenia, laser tattoo removal therapy is available and widely accessible. There is a wide range of facilities offering laser tattoo removal, ranging from different private clinics to beauty salons. Different facilities use different lasers, but not all lasers, however, are optimal for successful and complete tattoo removal, as inappropriate use can cause many unwanted side effects.Methods: Eleven (11 patients (2 men and 9 women requesting tattoo removal were treated in our department. When treating our patients, we used Fotona’s QX MAX quality-switched Nd:YAG laser which offers four different wavelengths in a single system; 1064 nm Nd:YAG was used to treat and remove dark pigments, 532 nm KTP for red, tan-colored, purple and orange tattoo inks, 650 nm dye for green tattoo inks and 585 nm dye for sky-blue colored inks.Results: Satisfactory tattoo removal was achieved in all patients treated. Patients were very satisfied with the success and the number of treatments needed for tattoo removal. There were mild unwanted side effects and the pain was moderate. The average number of treatments required for complete tattoo removal was less than 7, ranging from 3 to 21 treatments. Patients’ satisfaction with tattoo removal was estimated at 5.2 (on a scale from 1 to 6.Conclusions: Our study showed that Q-switched lasers successfully remove tattoo ink, however several treatments are required for satisfactory tattoo removal

  15. Removal of arsenic and iron removal from drinking water using coagulation and biological treatment.

    Science.gov (United States)

    Pramanik, Biplob Kumar; Pramanik, Sagor Kumar; Suja, Fatihah

    2016-02-01

    Effects of biological activated carbon (BAC), biological aerated filter (BAF), alum coagulation and Moringa oleifera coagulation were investigated to remove iron and arsenic contaminants from drinking water. At an initial dose of 5 mg/L, the removal efficiency for arsenic and iron was 63% and 58% respectively using alum, and 47% and 41% respectively using Moringa oleifera. The removal of both contaminants increased with the increase in coagulant dose and decrease in pH. Biological processes were more effective in removing these contaminants than coagulation. Compared to BAF, BAC gave greater removal of both arsenic and iron, removing 85% and 74%, respectively. Longer contact time for both processes could reduce the greater concentration of arsenic and iron contaminants. The addition of coagulation (at 5 mg/L dosage) and a biological process (with 15 or 60 min contact time) could significantly increase removal efficiency, and the maximum removal was observed for the combination of alum and BAC treatment (60 min contact time), with 100% and 98.56% for arsenic and iron respectively. The reduction efficiency of arsenic and iron reduced with the increase in the concentration of dissolved organics in the feedwater due to the adsorption competition between organic molecules and heavy metals.

  16. Electrochemical removal of biofilms from titanium dental implant surfaces.

    Science.gov (United States)

    Schneider, Sebastian; Rudolph, Michael; Bause, Vanessa; Terfort, Andreas

    2018-06-01

    The infection of dental implants may cause severe inflammation of tissue and even bone degradation if not treated. For titanium implants, a new, minimally invasive approach is the electrochemical removal of the biofilms including the disinfection of the metal surface. In this project, several parameters, such as electrode potentials and electrolyte compositions, were varied to understand the underlying mechanisms. Optimal electrolytes contained iodide as well as lactic acid. Electrochemical experiments, such as cyclic voltammetry or measurements of open circuit potentials, were performed in different cell set-ups to distinguish between different possible reactions. At the applied potentials of E species are formed at the anode, such as triiodide and hydrogen peroxide. Ex situ tests with model biofilms of E. coli clearly demonstrated the effectiveness of the respective anolytes in killing the bacteria, as determined by the LIVE/DEAD™ assay. Using optimized electrolysis parameters of 30 s at 7.0 V and 300 mA, a 14-day old wildtype biofilm could be completely removed from dental implants in vitro. Copyright © 2018 Elsevier B.V. All rights reserved.

  17. Hot gas cleaning, a targeted project

    Energy Technology Data Exchange (ETDEWEB)

    Romey, I. [University of Essen, Essen (Germany)

    1998-11-01

    Advanced hot gas cleaning systems will play a key role in future integrated combined cycle technologies. IGCC demonstration plants in operation or under construction are at present equipped with conventional wet gas scrubbing and cleaning systems. Feasibility studies for those IGCC plants have shown that the total efficiency of the processes can be improved using hot gas cleaning systems. However, this technology has not been developed and tested at a technical scale. Six well-known European industrial companies and research centres jointly worked together since January 1996 on a Targeted Project `Hot Gas Cleaning` to investigate and develop new hot gas cleaning systems for advanced clean coal power generation processes. In addition project work on chemical analysis and modelling was carried out in universities in England and Germany. The latest main findings were presented at the workshop. The main project aims are summarised as follows: to increase efficiency of advanced power generation processes; to obtain a reduction of alkalis and environmental emissions e.g. SO{sub 2}, NO{sub x}, CO{sub 2} and dust; and to develop the design basis for future industrial plants based on long-term operation of laboratory, pilot and demo-plants. To cover a range of possible process routes for future hot gas cleaning systems the following research programme is under investigation: removal of trace elements by different commercial and self developed sorbents; gas separation by membranes; separation of gas turbine relevant pollutants by hot filter dust and; H{sub 2}S removal and gas dedusting at high temperatures. 13 figs.

  18. Skin lesion removal

    Science.gov (United States)

    ... likely to be done when there is a concern about a skin cancer. Most often, an area the shape of an ellipse is removed, as this makes it easier to close with stitches. The entire lesion is removed, going as deep as the fat, if needed, to ...

  19. Possible use of electron beam treatment for removal of SO2 in off-gases from copper smelters. Preliminary tests results

    International Nuclear Information System (INIS)

    Villanueva, L.; Ahumanda, L.; Chmielewski, A.; Zimek, A.; Budka, S.; Licki, J.

    1996-01-01

    The Chilean Nuclear Energy Commission is currently performing a previous feasibility study concerning possible utilization of electron-beam process for removal of SO 2 from different types of sulfurous streams from copper smelters. First part of the project was related to verify, in a experimental line at Institute of Nuclear Chemistry and Technology, INCT, Poland, the behaviour of the process for simulated off-gases with very high SO 2 content, between 5% to 15% by volume. Tests were performed at laboratory stage and with flowrate of 5 Nm 3 /hr, using an ILU-6 electron accelerator, with the following results: High removal efficiencies of SO 2 , up to 90% were achieved for simulated off-gases containing up to 15% of SO 2 ; Required dose was in the range 5 to 8 kGy; Big influence of NH 3 stoichiometry and gas humidity on SO 2 removal efficiency; Rapid generation of sub-micron solid by-product, in great amount, that causes deposits on ducts and filtration units. This work presents the experimental results and discuss is technical projections in the field of interest. (author)

  20. Waste-to-Energy Cogeneration Project, Centennial Park

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Clay; Mandon, Jim; DeGiulio, Thomas; Baker, Ryan

    2014-04-29

    The Waste-to-Energy Cogeneration Project at Centennial Park has allowed methane from the closed Centennial landfill to export excess power into the the local utility’s electric grid for resale. This project is part of a greater brownfield reclamation project to the benefit of the residents of Munster and the general public. Installation of a gas-to-electric generator and waste-heat conversion unit take methane byproduct and convert it into electricity at the rate of about 103,500 Mwh/year for resale to the local utility. The sale of the electricity will be used to reduce operating budgets by covering the expenses for streetlights and utility bills. The benefits of such a project are not simply financial. Munster’s Waste-to Energy Cogeneration Project at Centennial Park will reduce the community’s carbon footprint in an amount equivalent to removing 1,100 cars from our roads, conserving enough electricity to power 720 homes, planting 1,200 acres of trees, or recycling 2,000 tons of waste instead of sending it to a landfill.

  1. Regulatory compliance issues related to the White Oak Creek Embayment time-critical removal action

    International Nuclear Information System (INIS)

    Leslie, M.; Kimmel, B.L.

    1992-01-01

    In September 1990, Martin Marietta Energy Systems (Energy Systems) discovered high levels of Cesium-137 present in surface sediments at the mouth of White Oak Creek (WOC) Embayment. WOC receives the majority of surface water drainage from Oak Ridge National Laboratory. Following this discovery, the Department of Energy (DOE) and Energy Systems pursued stabilizing sediment migration under provisions of the National Contingency Plan (NCP) Section 300.400 et. seq. as a time-critical removal action. However, significant uncertainty exists concerning the applicability of NCP procedural requirements designed for conducting US EPA-led, Superfund-financed response actions, because NCP Subpart K dealing with response actions at federal facilities has not been promulgated. In addition, relatively new guidance exists from DOE concerning National Environmental Policy Act documentation requirements for categorical exclusions associated with conducting removal actions at DOE facilities. A proactive approach was taken to identify issues and involve appropriate state and federal regulatory agencies. This approach required achieving consensus among all involved parties and identification of all applicable or relevant and appropriate regulatory requirements related to the removal action. As a result, this project forms a framework for conducting future time-critical removal actions at federal facilities

  2. Bimetallic Porous Iron (pFe) Materials for Remediation/Removal of Tc from Aqueous Systems

    Energy Technology Data Exchange (ETDEWEB)

    Li, D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-09-29

    Remediation of Tc remains an unresolved challenge at SRS and other DOE sites. The objective of this project was to develop novel bimetallic porous iron (pFe) materials for Tc removal from aqueous systems. We showed that the pFe is much more effective in removing TcO4 - (×30) and ReO4 - (×8) from artificial groundwater than granular iron. Tc K-edge XANES spectroscopy indicated that Tc speciation on the pFe was 18% adsorbed TcO4 -, 28% Tc(IV) in Tc dioxide and 54% Tc(IV) into the structure of Fe hydroxide. A variety of catalytic metal nanoparticles (i.e., Ni, Cu, Zn, Ag, Sn and Pd) were successfully deposited on the pFe using scalable chemical reduction methods. The Zn-pFe was outstanding among the six bimetallic pFe materials, with a capacity increase of >100% for TcO4 - removal and of 50% for ReO4 - removal, compared to the pFe. These results provide a highly applicable platform for solving critical DOE and industrial needs related to nuclear environmental stewardship and nuclear power production.

  3. Multi-weight isotherm results for mercury removal in upper East Fork Popular Creek water

    International Nuclear Information System (INIS)

    Bostick, D.A.; Klasson, K.T.

    1998-02-01

    Many sorbents have been developed for the removal of mercury and heavy metals from waters; however, the majority of data published to date do not address the removal of mercury to the target levels represented in this project. The application to which these sorbents are targeted for use is the removal of mercury from microgram-per-liter levels to low nanogram-per-liter levels. Sorbents with thiouronium, thiol, amine, sulfur, and proprietary functional groups were selected for these studies. The initial mercury content in the majority of the batch samples was significantly augmented so that the equilibrium concentration was similar to that found in the original stream sample for at least one sample. Mercury was successfully removed from actual water via adsorption onto Ionac SR-4 (by Sybron Chemicals, Inc.), Keyle:X (by SolmeteX), and Mersorb (by Nucon International, Inc.) resins to levels below the target goal of 12 ng/L. A thiol-based resin (Ionac SR-4) performed the best, indicating that over 200,000 volumes of water could be treated with one volume of resin. The cost of the resin is approximately $0.24 per 1000 gal of water

  4. How does blastomere removal affect embryonic development? : A time-lapse analysis

    DEFF Research Database (Denmark)

    Kirkegaard, Kirstine; Hindkjær, Johnny Juhl; Ingerslev, Hans Jakob

    of the 6-10 cell embryo. It has been argued that blastomere removal does not affect embryonic development, but few studies have focussed on safety of the procedure. Recently, time-lapse studies on mice have suggested that blastomere removal affects embryonic development. The present study was conducted...... to evaluate the effect of blastomere biopsy on early human embryonic development using time-lapse analysis. Materials and methods: Couples undergoing IVF treatment or PGD were requested permission to include embryos in the project. The diagnosis healthy/diseased was made by analysis of a single blastomere....... For PGD 56 human embryos were biopsied 68 hours after fertilisation, the majority at the eight cell stage. As controls 43 non-biopsied embryos at the 6-8 cell stage were selected. All embryos were cultured until 5 days after fertilisation in a time-lapse incubator (EmbryoScope™). Key events such as time...

  5. Large-scale dam removal on the Elwha River, Washington, USA: fluvial sediment load

    Science.gov (United States)

    Magirl, Christopher S.; Hilldale, Robert C.; Curran, Christopher A.; Duda, Jeffrey J.; Straub, Timothy D.; Domanski, Marian M.; Foreman, James R.

    2015-01-01

    The Elwha River restoration project, in Washington State, includes the largest dam-removal project in United States history to date. Starting September 2011, two nearly century-old dams that collectively contained 21 ± 3 million m3 of sediment were removed over the course of three years with a top-down deconstruction strategy designed to meter the release of a portion of the dam-trapped sediment. Gauging with sediment-surrogate technologies during the first two years downstream from the project measured 8,200,000 ± 3,400,000 tonnes of transported sediment, with 1,100,000 and 7,100,000 t moving in years 1 and 2, respectively, representing 3 and 20 times the Elwha River annual sediment load of 340,000 ± 80,000 t/y. During the study period, the discharge in the Elwha River was greater than normal (107% in year 1 and 108% in year 2); however, the magnitudes of the peak-flow events during the study period were relatively benign with the largest discharge of 292 m3/s (73% of the 2-year annual peak-flow event) early in the project when both extant reservoirs still retained sediment. Despite the muted peak flows, sediment transport was large, with measured suspended-sediment concentrations during the study period ranging from 44 to 16,300 mg/L and gauged bedload transport as large as 24,700 t/d. Five distinct sediment-release periods were identified when sediment loads were notably increased (when lateral erosion in the former reservoirs was active) or reduced (when reservoir retention or seasonal low flows and cessation of lateral erosion reduced sediment transport). Total suspended-sediment load was 930,000 t in year 1 and 5,400,000 t in year 2. Of the total 6,300,000 ± 3,200,000 t of suspended-sediment load, 3,400,000 t consisted of silt and clay and 2,900,000 t was sand. Gauged bedload on the lower Elwha River in year 2 of the project was 450,000 ± 360,000 t. Bedload was not quantified in year 1, but qualitative observations using bedload

  6. Socioeconomic Constraints to Biomass Removal from Forest Lands for Fire Risk Reduction in the Western U.S.

    Directory of Open Access Journals (Sweden)

    David L. Nicholls

    2018-05-01

    Full Text Available Many socioeconomic constraints exist for biomass removals from federal lands in the western U.S. We examine several issues of importance, including biomass supply chains and harvesting costs, innovative new uses for bioenergy products, and the policy framework in place to provide incentives for biomass use. Western states vary greatly in the extent and utilization of forest resources, the proportion of land under federal ownership, and community and stakeholder structure and dynamics. Our research—which focused on the socioeconomic factors associated with biomass removal, production, and use—identified several important trends. Long-term stewardship projects could play a role in influencing project economics while being conducive to private investment. State policies are likely to help guide the growth of biomass utilization for energy products. New markets and technologies, such as biofuels, for use in the aviation industry, torrefied wood, mobile pyrolysis, and wood coal cofiring could greatly change the landscape of biomass use. Social needs of residents in wildland urban interfaces will play an important role, especially in an era of megafires. All of these trends—including significant unknowns, like the volatile prices of fossil energy—are likely to affect the economics of biomass removal and use in western forests.

  7. Preliminary safety evaluation for 241-C-106 waste retrieval, project W-320

    International Nuclear Information System (INIS)

    Conner, J.C.

    1994-01-01

    This document presents the Preliminary Safety Evaluation for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). The US DOE has been mandated to develop plans for response to safety issues associated with the waste storage tanks at the Hanford Site, and to report the progress of implementing those plans to Congress. The objectives of Project W-230 are to design, fabricate, develop, test, and operate a new retrieval system capable of removing a minimum of about 75% of the high-heat waste contained in C-106. It is anticipated that sluicing operations can remove enough waste to reduce the remaining radiogenic heat load to levels low enough to resolve the high-heat safety issue as well as allow closure of the tank safety issue

  8. Removal of uranium from uranium-contaminated soils -- Phase 1: Bench-scale testing

    International Nuclear Information System (INIS)

    Francis, C.W.

    1993-09-01

    To address the management of uranium-contaminated soils at Fernald and other DOE sites, the DOE Office of Technology Development formed the Uranium in Soils Integrated Demonstration (USID) program. The USID has five major tasks. These include the development and demonstration of technologies that are able to (1) characterize the uranium in soil, (2) decontaminate or remove uranium from the soil, (3) treat the soil and dispose of any waste, (4) establish performance assessments, and (5) meet necessary state and federal regulations. This report deals with soil decontamination or removal of uranium from contaminated soils. The report was compiled by the USID task group that addresses soil decontamination; includes data from projects under the management of four DOE facilities [Argonne National Laboratory (ANL), Los Alamos National Laboratory (LANL), Oak Ridge National Laboratory (ORNL), and the Savannah River Plant (SRP)]; and consists of four separate reports written by staff at these facilities. The fundamental goal of the soil decontamination task group has been the selective extraction/leaching or removal of uranium from soil faster, cheaper, and safer than current conventional technologies. The objective is to selectively remove uranium from soil without seriously degrading the soil's physicochemical characteristics or generating waste forms that are difficult to manage and/or dispose of. Emphasis in research was placed more strongly on chemical extraction techniques than physical extraction techniques

  9. Bond to deliver our nuclear projects from bondage

    International Nuclear Information System (INIS)

    Subramanian, T.K.

    1985-01-01

    This paper examines the Internal Revenue Service (IRS) ruling that prevents the use of Pollution Control Revenue Bonds (PCRB) as a source of capital to complete nuclear projects, advances arguments that prevention of pollutants should be treated at least in par with the removal, alteration, or disposal of realized pollution, recommends reexamination of the IRS ruling, and emphasizes the need for the nuclear community and ultimately the US Congress to take a fresh look at the applicability of the PCRB tax exemption incentives for the nuclear safety-related structures and systems, at least for the completion of suspended nuclear projects

  10. John Day River Subbasin Fish Habitat Enhancement Project, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Powell, Russ M.; Delano, Kenneth H.; Jerome, James P.

    2002-07-01

    Work undertaken in 2001 included: (1) 3335 structure posts were pounded on six new projects thereby protecting 10 miles of stream (2) Completion of 1000 ft. of barbed wire fence and one watergap on the Middle Fork of the John Day River/ Forrest property. (3) Fence removal of 5010 ft. of barbed wire fence on the Meredith project. (4) Maintenance of all active project fences (66 miles), watergaps (76), spring developments (32) and plantings were checked and repairs performed. (5) Since the initiation of the Fish Habitat Project in 1984 we have 63.74 miles of stream protected using 106.78 miles of fence. With the addition of the Restoration and Enhancement Projects we have 180.64 miles of fence protecting 120.6 miles of stream.

  11. Imaging in gynecological disease. 10: Clinical and ultrasound characteristics of decidualized endometriomas surgically removed during pregnancy.

    Science.gov (United States)

    Mascilini, F; Moruzzi, C; Giansiracusa, C; Guastafierro, F; Savelli, L; De Meis, L; Epstein, E; Timor-Tritsch, I E; Mailath-Pokorny, M; Ercoli, A; Exacoustos, C; Benacerraf, B R; Valentin, L; Testa, A C

    2014-09-01

    To describe the clinical history and ultrasound findings in women with decidualized endometriomas surgically removed during pregnancy. In this retrospective study, women with a histological diagnosis of decidualized endometrioma during pregnancy who had undergone preoperative ultrasound examination were identified from the databases of seven ultrasound centers. The ultrasound appearance of the tumors was described on the basis of ultrasound images, ultrasound reports and research protocols (when applicable) by one author from each center using the terms and definitions of the International Ovarian Tumor Analysis (IOTA) group. In addition, two authors reviewed together available digital ultrasound images and used pattern recognition to describe the typical ultrasound appearance of decidualized endometriomas. Eighteen eligible women were identified. Median age was 34 (range, 20-43) years. Median gestational age at surgical removal of the decidualized endometrioma was 18 (range, 11-41) weeks. Seventeen women (94%) were asymptomatic and one presented with pelvic pain. In three of the 18 women an ultrasound diagnosis of endometrioma had been made before pregnancy. The original ultrasound examiner was uncertain whether the mass was benign or malignant in 10 (56%) women and suggested a diagnosis of benignity in nine (50%) women, borderline in eight women (44%), and invasive malignancy in one (6%) woman. Seventeen decidualized endometriomas contained a papillary projection, and in 16 of these at least one of the papillary projections was vascularized at power or color Doppler examination. The number of cyst locules varied between one (n = 11) and four. No woman had ascites. When using pattern recognition, most decidualized endometriomas (14/17, 82%) were described as manifesting vascularized rounded papillary projections with a smooth contour in an ovarian cyst with one or a few cyst locules and ground-glass or low-level echogenicity of the cyst fluid. Rounded vascularized

  12. Analysis and testing of W-DHR system for decay heat removal in the lead-cooled ELSY reactor

    International Nuclear Information System (INIS)

    Bandini, Giacomino; Meloni, Paride; Polidori, Massimiliano; Gaggini, Piero; Labanti, Valerio; Tarantino, Mariano; Cinotti, Luciano; Presciuttini, Leonardo

    2009-01-01

    An innovative LFR system that complies with GEN IV goals is under design in the frame of ELSY European project. ELSY is a lead-cooled pool-type reactor of about 1500 MW thermal power which normally relies on the secondary system for decay heat removal. Since the secondary system is not safety-grade and must be fully depressurized in case of detection of a steam generator tube rupture, an independent and much reliable decay heat removal (DHR) system is foreseen on the primary side. Owing to the limited capability of the Reactor Vessel Air Cooling System (RVACS) in this large power reactor, additional safety-grade loops equipped with coolers immersed in the primary coolant are necessary for an efficient removal of decay heat. Some of these loops (W-DHR) are of innovative design and may operate with water at atmospheric pressure. In the frame of the ICE program to be performed on the integral facility CIRCE at ENEA/Brasimone research centre within the EUROTRANS European project, integral circulation experiments with core heat transport and heat removal by steam generator will be conducted in a reactor pool-type configuration. Taking advantage from this experimental program, a mock-up of W-DHR heat exchanger will be tested in order to investigate its functional behavior for decay heat removal. Some pre-test calculations of W-DHR heat exchanger operation in CIRCE have been performed with the RELAP5 thermal-hydraulic code in order to support the heat exchanger design and test conduct. In this paper the experimental activity to be conducted in CIRCE and main results from W-DHR pre-test calculations are presented, along with a preliminary investigation of the W-DHR system efficiency in ELSY configuration. (author)

  13. Hanford Spent Nuclear Fuel Project recommended path forward

    International Nuclear Information System (INIS)

    Fulton, J.C.

    1994-10-01

    The Spent Nuclear Fuel Project (the Project), in conjunction with the U.S. Department of Energy-commissioned Independent Technical Assessment (ITA) team, has developed engineered alternatives for expedited removal of spent nuclear fuel, including sludge, from the K Basins at Hanford. These alternatives, along with a foreign processing alternative offered by British Nuclear Fuels Limited (BNFL), were extensively reviewed and evaluated. Based on these evaluations, a Westinghouse Hanford Company (WHC) Recommended Path Forward for K Basins spent nuclear fuel has been developed and is presented in Volume I of this document. The recommendation constitutes an aggressive series of projects to construct and operate systems and facilities to safely retrieve, package, transport, process, and store K Basins fuel and sludge. The overall processing and storage scheme is based on the ITA team's proposed passivation and vault storage process. A dual purpose staging and vault storage facility provides an innovative feature which allows accelerated removal of fuel and sludge from the basins and minimizes programmatic risks beyond any of the originally proposed alternatives. The projects fit within a regulatory and National Environmental Policy Act (NEPA) overlay which mandates a two-phased approach to construction and operation of the needed facilities. The two-phase strategy packages and moves K Basins fuel and sludge to a newly constructed Staging and Storage Facility by the year 2000 where it is staged for processing. When an adjoining facility is constructed, the fuel is cycled through a stabilization process and returned to the Staging and Storage Facility for dry interim (40-year) storage. The estimated total expenditure for this Recommended Path Forward, including necessary new construction, operations, and deactivation of Project facilities through 2012, is approximately $1,150 million (unescalated)

  14. Tube plug removal machine

    International Nuclear Information System (INIS)

    Hawkins, P.J.

    1987-01-01

    In a nuclear steam generator wherein some faulty tubes have been isolated by mechanical plugging, to remove a selected plug without damaging the associated tube, a plug removal machine is used. The machine drills into a plug portion with a tap drill bit having a drill portion a tap portion and a threaded portion, engaging that plug portion with the threaded portion after the drilled hole has been threaded by the tap portion thereof, and removing a portion of the plug in the tube with a counterbore drill bit mounted concentrically about the tap drill bit. A trip pin and trip spline disengage the tap drill bit from the motor. The counterbore drill bit is thereafter self-centered with respect to the tube and plug about the now stationary tap drill bit. After a portion of the plug has been removed by the counterbore drill bit, pulling on the top drill bit by grippers on slots will remove the remaining plug portion from the tube. (author)

  15. Arsenic removal by electrocoagulation process: Recent trends and removal mechanism.

    Science.gov (United States)

    Nidheesh, P V; Singh, T S Anantha

    2017-08-01

    Arsenic contamination in drinking water is a major issue in the present world. Arsenicosis is the disease caused by the regular consumption of arsenic contaminated water, even at a lesser contaminated level. The number of arsenicosis patients is increasing day-by-day. Decontamination of arsenic from the water medium is the only one way to regulate this and the arsenic removal can be fulfilled by water treatment methods based on separation techniques. Electrocoagulation (EC) process is a promising technology for the effective removal of arsenic from aqueous solution. The present review article analyzes the performance of the EC process for arsenic removal. Electrocoagulation using various sacrificial metal anodes such as aluminium, iron, magnesium, etc. is found to be very effective for arsenic decontamination. The performances of each anode are described in detail. A special focus has been made on the mechanism behind the arsenite and arsenate removal by EC process. Main trends in the disposal methods of sludge containing arsenic are also included. Comparison of arsenic decontamination efficiencies of chemical coagulation and EC is also reported. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. REMOVAL OF ARSENIC FROM DRINKING WATER SUPPLIES BY IRON REMOVAL PROCESS

    Science.gov (United States)

    This design manual is an in-depth presentation of the steps required to design and operate a water treatment plant for removal of arsenic in the As (V) form from drinking water using an iron removal process. The manual also discusses the capital and operating costs including many...

  17. Expectation and task for constructing the volume reduction system of removed soils. In search of the technical integrity from the intermediate storage to final disposal

    International Nuclear Information System (INIS)

    Mori, Hisaki

    2016-01-01

    The intermediate storage volume of the removed soils and incineration ash in Fukushima is supposed about 22 million cubic meters. Within 30 years after starting the intermediate storage, the final disposal outside Fukushima prefecture to these removed soils and incineration ash is determined by the law. Because these removed soils are the very-very low radio activity, the volume reduction method is most effective to reduce the burden of the final disposal. As the volume reduction technology is the stage of research and development, the possibility of the introduction of the volume reduction technology that has the consistency of the final disposal technology is evaluated from the point of view of cost. Since this business is accompanied by economic and technical risk to implement private companies, this project is considered appropriate to be implemented as a national project. (author)

  18. EX8000 ramps up preparation phase in Horizon oil sands project

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2006-07-15

    This article presented details of Hitachi's EX8000 hydraulic shovel, a key piece of equipment that will be used throughout the extensive mine preparation phase of the Horizon oil sands project. Within 2 years, the project expects to produce over 200,000 barrels of oil per day. However, more than 400 million cubic metres of soil will need to be moved before production can begin. In order to remain on schedule, overburden must be removed in massive volumes. With a 52.3 cubic yard bucket, the Hitachi EX8000 has the capacity to feed a dozen 320 metric tonne haul trucks as well as several smaller 282 metric tonne trucks, and can fill each truck in 4 passes. Material is now being moved by to an area in which dikes are being constructed to house water generated in the refining process. Stockpiling, relocation and reclamation phases will follow as the project progresses. In order to reach the oil, as much as 75 feet of overburden must be removed, including layers of sandstone, limestone, trap rock and other materials. Once the overburden has been removed, oil sand layers are also often intermixed with other materials. The EX8000 can separate the tramp material from the oil sands, improving the overall efficiency of the operation. The Alberta-based North American Construction Group, who have a 10-year contract with Canadian Natural Resources Ltd. for the Horizon project, owns more than 100 Hitachi units in various sizes and has already purchased another EX8000 which is slated for delivery in the Fall of 2006. It was concluded that the company has purchased hundreds of new trucks to handle added volumes of materials being moved as the oil sands industry gains momentum. 3 figs.

  19. Removal Action Workplan for the 105-DR and 105-F Building Interim Safe Storage Projects and Ancillary Buildings

    International Nuclear Information System (INIS)

    Rodovsky, T. J.

    1999-01-01

    This document is the removal action workplan (RAW) for the 105-DR and 105-F Reactor Buildings and ancillary facilities. These buildings and facilities are located in the 100-D/DR and 100-F Areas of the Hanford Site in Benton County, Washington, which is owned and operated by the U.S. Department of Energy (DOE). The 100 Areas (including 100-D/DR and 100-F Areas) of the Hanford Site were placed on the U.S. Environmental Protection Agency's (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation,and Liability Act of 1980 (CERCLA). DOE has determined that hazardous substances in the 105-DR and 105-F Reactor Buildings and four ancillary facilities present a potential threat to human health or the environment DOE has also determined that a non-time critical removal action is warranted at these facilities

  20. CRBRP decay heat removal systems

    International Nuclear Information System (INIS)

    Hottel, R.E.; Louison, R.; Boardman, C.E.; Kiley, M.J.

    1977-01-01

    The Decay Heat Removal Systems for the Clinch River Breeder Reactor Plant (CRBRP) are designed to adequately remove sensible and decay heat from the reactor following normal shutdown, operational occurrences, and postulated accidents on both a short term and a long term basis. The Decay Heat Removal Systems are composed of the Main Heat Transport System, the Main Condenser and Feedwater System, the Steam Generator Auxiliary Heat Removal System (SGAHRS), and the Direct Heat Removal Service (DHRS). The overall design of the CRBRP Decay Heat Removal Systems and the operation under normal and off-normal conditions is examined. The redundancies of the system design, such as the four decay heat removal paths, the emergency diesel power supplies, and the auxiliary feedwater pumps, and the diversities of the design such as forced circulation/natural circulation and AC Power/DC Power are presented. In addition to overall design and system capabilities, the detailed designs for the Protected Air Cooled Condensers (PACC) and the Air Blast Heat Exchangers (ABHX) are presented

  1. SMART 3D SUBSURFACE CONTAMINANT CHARACTERIZATION AT THE BGRR DEC OMMISSIONING PROJECT

    International Nuclear Information System (INIS)

    HEISER, J.; KALB, P.; SULLIVAN, T.; MILIAN, L.

    2002-01-01

    The Brookhaven Graphite Research Reactor is currently on an accelerated decommissioning schedule with a completion date projected for 2005. The accelerated schedule combines characterization with removal actions for the various systems and structures. A major project issue involves characterization of the soils beneath contaminated Below Grade Ducts (BGD), the main air ducts connecting the exhaust plenums with the Fan House. The air plenums experienced water intrusion during BGRR operations and after shutdown. The water intrusions were attributed to rainwater leaks into degraded parts of the system, and to internal cooling water system leaks. If the characterization could provide enough information to show that soil contamination surrounding the BGD is either below cleanup guidelines or is very localized and can be ''surgically removed'' at a reasonable cost, the ducts may be decontaminated and left in place. This will provide significant savings compared to breaking up the 170-ft. long concrete duct, shipping the projected 9,000 m 3 of waste off-site and disposing of it in an approved site

  2. Acid Gas Removal from Natural Gas with Alkanolamines

    DEFF Research Database (Denmark)

    Sadegh, Negar

    commercially for the removal of acid gas impurities from natural gas. Alkanolamines, simple combinations of alcohols and ammonia, are the most commonly used category of chemical solvents for acid gas capture. This Ph.D. project is aboutthermodynamics of natural gas cleaning process with alkanolamines......Some 40 % of the world’s remaining gas reserves are sour or acid, containing large quantities of CO2 and H2S and other sulfur compounds. Many large oil and gas fields have more than 10 mole % CO2 and H2S content. In the gas processing industry absorption with chemical solvents has been used...... pressure on acid gas solubility was also quantitatively investigated through both experimental and modeling approaches....

  3. Analysis of a space debris laser removal system

    Science.gov (United States)

    Gjesvold, Evan; Straub, Jeremy

    2017-05-01

    As long as man ventures into space, he will leave behind debris, and as long as he ventures into space, this debris will pose a threat to him and his projects. Space debris must be located and decommissioned. Lasers may prove to be the ideal method, as they can operate at a distance from the debris, have a theoretically infinite supply of energy from the sun, and are a seemingly readily available technology. This paper explores the requirements and reasoning for such a laser debris removal method. A case is made for the negligibility of eliminating rotational velocity from certain systems, while a design schematic is also presented for the implementation of a cube satellite proof of concept.

  4. Increased sediment load during a large-scale dam removal changes nearshore subtidal communities.

    Directory of Open Access Journals (Sweden)

    Stephen P Rubin

    Full Text Available The coastal marine ecosystem near the Elwha River was altered by a massive sediment influx-over 10 million tonnes-during the staged three-year removal of two hydropower dams. We used time series of bathymetry, substrate grain size, remotely sensed turbidity, scuba dive surveys, and towed video observations collected before and during dam removal to assess responses of the nearshore subtidal community (3 m to 17 m depth. Biological changes were primarily driven by sediment deposition and elevated suspended sediment concentrations. Macroalgae, predominantly kelp and foliose red algae, were abundant before dam removal with combined cover levels greater than 50%. Where persistent sediment deposits formed, macroalgae decreased greatly or were eliminated. In areas lacking deposition, macroalgae cover decreased inversely to suspended sediment concentration, suggesting impacts from light reduction or scour. Densities of most invertebrate and fish taxa decreased in areas with persistent sediment deposition; however, bivalve densities increased where mud deposited over sand, and flatfish and Pacific sand lance densities increased where sand deposited over gravel. In areas without sediment deposition, most invertebrate and fish taxa were unaffected by increased suspended sediment or the loss of algae cover associated with it; however, densities of tubeworms and flatfish, and primary cover of sessile invertebrates increased suggesting benefits of increased particulate matter or relaxed competition with macroalgae for space. As dam removal neared completion, we saw evidence of macroalgal recovery that likely owed to water column clearing, indicating that long-term recovery from dam removal effects may be starting. Our results are relevant to future dam removal projects in coastal areas and more generally to understanding effects of increased sedimentation on nearshore subtidal benthic communities.

  5. Increased sediment load during a large-scale dam removal changes nearshore subtidal communities

    Science.gov (United States)

    Rubin, Stephen P.; Miller, Ian M.; Foley, Melissa M.; Berry, Helen D.; Duda, Jeffrey J.; Hudson, Benjamin; Elder, Nancy E.; Beirne, Matthew M.; Warrick, Jonathan; McHenry, Michael L.; Stevens, Andrew; Eidam, Emily; Ogston, Andrea; Gelfenbaum, Guy R.; Pedersen, Rob

    2017-01-01

    The coastal marine ecosystem near the Elwha River was altered by a massive sediment influx—over 10 million tonnes—during the staged three-year removal of two hydropower dams. We used time series of bathymetry, substrate grain size, remotely sensed turbidity, scuba dive surveys, and towed video observations collected before and during dam removal to assess responses of the nearshore subtidal community (3 m to 17 m depth). Biological changes were primarily driven by sediment deposition and elevated suspended sediment concentrations. Macroalgae, predominantly kelp and foliose red algae, were abundant before dam removal with combined cover levels greater than 50%. Where persistent sediment deposits formed, macroalgae decreased greatly or were eliminated. In areas lacking deposition, macroalgae cover decreased inversely to suspended sediment concentration, suggesting impacts from light reduction or scour. Densities of most invertebrate and fish taxa decreased in areas with persistent sediment deposition; however, bivalve densities increased where mud deposited over sand, and flatfish and Pacific sand lance densities increased where sand deposited over gravel. In areas without sediment deposition, most invertebrate and fish taxa were unaffected by increased suspended sediment or the loss of algae cover associated with it; however, densities of tubeworms and flatfish, and primary cover of sessile invertebrates increased suggesting benefits of increased particulate matter or relaxed competition with macroalgae for space. As dam removal neared completion, we saw evidence of macroalgal recovery that likely owed to water column clearing, indicating that long-term recovery from dam removal effects may be starting. Our results are relevant to future dam removal projects in coastal areas and more generally to understanding effects of increased sedimentation on nearshore subtidal benthic communities.

  6. Combined wet electrostatic aerosol removal and energy recovery; Energigenvinding med samtidig fjernelse af sure komponenter og aerosoler fra roeggas

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The objective of this project, entitled 'Combined Wet Electrostatic Aerosol Removal and Energy Recovery', was to develop and test a low-cost process for removal of fine and ultrafine particles as well as acid gases and other pollutants from flue gases. The process is based on a combination of electrostatic precipitation and wet scrubbing in a single unit. This has several potential advantages compared to traditional bag filtering such as lower operational costs, energy recovery by condensation, elimination of fire risk, as well as the possibility of reducing emissions of acid gases and organic compounds in the scrubber section. Moreover, the electrostatic section could be retrofitted on existing wet scrubbers, thus enhancing their particulate removal efficiency significantly. A pilot-plant (approx. 1:10 of full scale, operated at about 60 kV) was constructed at the 2.5 MW straw-fired district heating plant of Hals. During straw firing a large number of submicron particles are generated that are not removed by the existing wet scrubber at Hals. The particle removal efficiency of the process was monitored on-line using SMPS equipment (Scanning Mobility Particle Sizers). Special dilution probes were constructed due to a high moisture content of the gas and high particle number concentrations. Two complete SMPS equipments were operated simultaneously on the raw and clean gas side, respectively. The particle removal efficiency of the process relies on the presence of a strong electric field. The results obtained (up to 40% removal efficiency of particles below 0.8 {mu}m mobile diameter) indicate that the strength and stability of the field is insufficient. The reason for this is not exactly known, because loss of current may occur due to several factors such as particulate build-up on electrode and reactor surfaces, condensation of water on surfaces, variations in gas and particulate composition etc. The efforts were concentrated on the electrostatic section

  7. Design and delivery of the diamond double double bend achromat project

    International Nuclear Information System (INIS)

    Kay, J.; Hammond, N. P.; Thomson, A.

    2016-01-01

    A major project is underway at Diamond Light Source to remove one of the 24 Double Bend Achromat (DBA) Storage Ring cells and replace it with a Double Double Bend Achromat (DDBA). In this way a new Insertion Device (ID) straight can be created and so ID light can be produced and delivered to a beamline previously only capable of receiving Bending Magnet (BM) radiation. This project is in support of the micro-focus Protein Crystallography (MX) beamline VMX-m which is scheduled to take users towards the end of 2017. This paper describes the Engineering Design of the DDBA project in more detail and gives the current status of the project.

  8. Resonance Excitation of Longitudinal High Order Modes in Project X Linac

    Energy Technology Data Exchange (ETDEWEB)

    Khabiboulline, T.N.; Sukhanov, A.AUTHOR = Awida, M.; Gonin, I.; Lunin, A.AUTHOR = Solyak, N.; Yakovlev, V.; /Fermilab

    2012-05-01

    Results of simulation of power loss due to excitation of longitudinal high order modes (HOMs) in the accelerating superconducting RF system of CW linac of Project X are presented. Beam structures corresponding to the various modes of Project X operation are considered: CW regime for 3 GeV physics program; pulsed mode for neutrino experiments; and pulsed regime, when Project X linac operates as a driver for Neutrino Factory/Muon Collider. Power loss and associated heat load due to resonance excitation of longitudinal HOMs are shown to be small in all modes of operation. Conclusion is made that HOM couplers can be removed from the design of superconducting RF cavities of Project X linac.

  9. Design and delivery of the diamond double double bend achromat project

    Energy Technology Data Exchange (ETDEWEB)

    Kay, J., E-mail: jim.kay@diamond.ac.uk; Hammond, N. P.; Thomson, A. [Diamond Light Source, Didcot, Oxfordshire, UK, OX11 0DE (United Kingdom)

    2016-07-27

    A major project is underway at Diamond Light Source to remove one of the 24 Double Bend Achromat (DBA) Storage Ring cells and replace it with a Double Double Bend Achromat (DDBA). In this way a new Insertion Device (ID) straight can be created and so ID light can be produced and delivered to a beamline previously only capable of receiving Bending Magnet (BM) radiation. This project is in support of the micro-focus Protein Crystallography (MX) beamline VMX-m which is scheduled to take users towards the end of 2017. This paper describes the Engineering Design of the DDBA project in more detail and gives the current status of the project.

  10. Resonance Excitation of Longitudinal High Order Modes in Project X Linac

    International Nuclear Information System (INIS)

    Gonin, I.V.; Khabiboulline, T.N.; Lunin, A.; Solyak, N.; Sukhanov, A.I.; Yakovlev, V.P.; Awida, M.H.

    2012-01-01

    Results of simulation of power loss due to excitation of longitudinal high order modes (HOMs) in the accelerating superconducting RF system of CW linac of Project X are presented. Beam structures corresponding to the various modes of Project X operation are considered: CW regime for 3 GeV physics program; pulsed mode for neutrino experiments; and pulsed regime, when Project X linac operates as a driver for Neutrino Factory/Muon Collider. Power loss and associated heat load due to resonance excitation of longitudinal HOMs are shown to be small in all modes of operation. Conclusion is made that HOM couplers can be removed from the design of superconducting RF cavities of Project X linac.

  11. Removing a barrier to computer-based outbreak and disease surveillance--the RODS Open Source Project.

    Science.gov (United States)

    Espino, Jeremy U; Wagner, M; Szczepaniak, C; Tsui, F C; Su, H; Olszewski, R; Liu, Z; Chapman, W; Zeng, X; Ma, L; Lu, Z; Dara, J

    2004-09-24

    Computer-based outbreak and disease surveillance requires high-quality software that is well-supported and affordable. Developing software in an open-source framework, which entails free distribution and use of software and continuous, community-based software development, can produce software with such characteristics, and can do so rapidly. The objective of the Real-Time Outbreak and Disease Surveillance (RODS) Open Source Project is to accelerate the deployment of computer-based outbreak and disease surveillance systems by writing software and catalyzing the formation of a community of users, developers, consultants, and scientists who support its use. The University of Pittsburgh seeded the Open Source Project by releasing the RODS software under the GNU General Public License. An infrastructure was created, consisting of a website, mailing lists for developers and users, designated software developers, and shared code-development tools. These resources are intended to encourage growth of the Open Source Project community. Progress is measured by assessing website usage, number of software downloads, number of inquiries, number of system deployments, and number of new features or modules added to the code base. During September--November 2003, users generated 5,370 page views of the project website, 59 software downloads, 20 inquiries, one new deployment, and addition of four features. Thus far, health departments and companies have been more interested in using the software as is than in customizing or developing new features. The RODS laboratory anticipates that after initial installation has been completed, health departments and companies will begin to customize the software and contribute their enhancements to the public code base.

  12. Readiness evaluation report -- High-exposure rate hardware removal resumption of activities

    International Nuclear Information System (INIS)

    Volkman, C.L.

    1996-11-01

    In August 1996, N Basin Project Management proactively ceased activities in the N Basin after noting several radiological control anomalies occurring during the performance of the high exposure rate hardware removal activity. The HERH is one of several activities that will be accomplished to complete deactivation of N Basin. Three project critiques were performed to identify causes and several corrective actions were identified. To ensure the true causes of the events were identified the N Basin Project Manager requested that a root cause analysis be performed for the events covered by the three critiques. The intent was to identify recurring events and evaluate the effectiveness of corrective action implementation. These three review elements were used by the project to develop a corrective action plan (CAP) which consisted of both project unique and programmatic items. The N Basin Project is using this BHI Readiness Evaluation (RE) process as a mechanism to independently verify that corrective actions identified from the CAP have been completed and that no changes have been made during the stand down that affect the resumption of the HERH activities. A readiness evaluation (RE) plan (Attachment 3) was prepared. The completed Readiness Evaluation Records which documents the results of the team member evaluations are in attachment 1. The independent readiness evaluation team identified 5 deficiencies of which two are post startup and three are pre startup. All deficiencies are in the area of training. These findings are explained in detail in Attachment 2

  13. Aqueous-stream uranium-removal technology cost/benefit and market analysis

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    The primary purpose of this report is to present information that was gathered by Kapline Enterprises, Inc. (KEI) in order to help the Department of Energy (DOE) determine the merit of continued biosorption research funding. However, in the event that funding is continued, it is also intended to help the researchers in their efforts to develop a better uranium-removal process. This report (1) provides a comparison of DOE sites that may utilize aqueous-stream, uranium-removal biosorption technology, (2) presents a comparison of the biosorption and ion exchange processes, and (3) establishes performance criteria by which the project can be measured. It also attempts to provide focus for biosorbent ground-water-remediation research and to ask questions that need to be answered. This report is primarily a study of the US market for technologies that remove uranium from aqueous streams, but it also addresses the international market-particularly for Germany. Because KEI`s access to international market information is extremely limited, the material presented in this report represents a best effort to obtain this data. Although uranium-contaminated aqueous streams are a problem in other countries as well, the scope of this report is primarily limited to the US and Germany for two reasons: (1) Germany is the country of the biosorbent-CRADA partner and (2) time constraints.

  14. Aqueous-stream uranium-removal technology cost/benefit and market analysis

    International Nuclear Information System (INIS)

    1994-03-01

    The primary purpose of this report is to present information that was gathered by Kapline Enterprises, Inc. (KEI) in order to help the Department of Energy (DOE) determine the merit of continued biosorption research funding. However, in the event that funding is continued, it is also intended to help the researchers in their efforts to develop a better uranium-removal process. This report (1) provides a comparison of DOE sites that may utilize aqueous-stream, uranium-removal biosorption technology, (2) presents a comparison of the biosorption and ion exchange processes, and (3) establishes performance criteria by which the project can be measured. It also attempts to provide focus for biosorbent ground-water-remediation research and to ask questions that need to be answered. This report is primarily a study of the US market for technologies that remove uranium from aqueous streams, but it also addresses the international market-particularly for Germany. Because KEI's access to international market information is extremely limited, the material presented in this report represents a best effort to obtain this data. Although uranium-contaminated aqueous streams are a problem in other countries as well, the scope of this report is primarily limited to the US and Germany for two reasons: (1) Germany is the country of the biosorbent-CRADA partner and (2) time constraints

  15. Fishery biology of the goldfish Carassius auratus (Linnaeus, 1758 in Lake Trasimeno (Umbria, Italy

    Directory of Open Access Journals (Sweden)

    Lorenzoni M.

    2010-01-01

    Full Text Available The fishery biology of the goldfish Carassius auratus was studied in Lake Trasimeno by analysing the selectivity of the equipment that can be used to control this invasive species. Sampling was conducted monthly from February 2003 to January 2004 by means of electrofishing, fyke-nets and gill-nets of different-sized mesh (22, 25, 28, 35, 40, 50, 70 and 80 mm. The average value of the CPUEs of goldfish caught was 10175.48 g·10−2·m−2 for gill-nets, 246.97 g·h−1 for fyke-nets and 606.50 g·min−1 for electrofishing. The efficiency of electrofishing was not uniform in all periods of the year, the mean CPUEs being highest in spring, when specimens of reproductive age were preferentially caught. Gill-nets yielded abundant catches of goldfish in all seasons, and displayed good sampling efficiency even in winter. With regard to the selectivity of gill-nets, estimated optimum selection lengths for each mesh size were: 11.92 cm, 13.55 cm, 15.18 cm, 18.97 cm, 21.68 cm, 27.10 cm, 37.94 cm and 43.36 cm. The results of this research demonstrate that the various fishing techniques can be effectively combined with the aim of controlling the goldfish population in Lake Trasimeno.

  16. Hot Spot Removal System: System description

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    Hazardous wastes contaminated with radionuclides, chemicals, and explosives exist across the Department of Energy complex and need to be remediated due to environmental concerns. Currently, an opportunity is being developed to dramatically reduce remediation costs and to assist in the acceleration of schedules associated with these wastes by deploying a Hot Spot Removal System. Removing the hot spot from the waste site will remove risk driver(s) and enable another, more cost effective process/option/remedial alternative (i.e., capping) to be applied to the remainder of the site. The Hot Spot Removal System consists of a suite of technologies that will be utilized to locate and remove source terms. Components of the system can also be used in a variety of other cleanup activities. This Hot Spot Removal System Description document presents technologies that were considered for possible inclusion in the Hot Spot Removal System, technologies made available to the Hot Spot Removal System, industrial interest in the Hot Spot Removal System`s subsystems, the schedule required for the Hot Spot Removal System, the evaluation of the relevant technologies, and the recommendations for equipment and technologies as stated in the Plan section.

  17. Hot Spot Removal System: System description

    International Nuclear Information System (INIS)

    1997-09-01

    Hazardous wastes contaminated with radionuclides, chemicals, and explosives exist across the Department of Energy complex and need to be remediated due to environmental concerns. Currently, an opportunity is being developed to dramatically reduce remediation costs and to assist in the acceleration of schedules associated with these wastes by deploying a Hot Spot Removal System. Removing the hot spot from the waste site will remove risk driver(s) and enable another, more cost effective process/option/remedial alternative (i.e., capping) to be applied to the remainder of the site. The Hot Spot Removal System consists of a suite of technologies that will be utilized to locate and remove source terms. Components of the system can also be used in a variety of other cleanup activities. This Hot Spot Removal System Description document presents technologies that were considered for possible inclusion in the Hot Spot Removal System, technologies made available to the Hot Spot Removal System, industrial interest in the Hot Spot Removal System''s subsystems, the schedule required for the Hot Spot Removal System, the evaluation of the relevant technologies, and the recommendations for equipment and technologies as stated in the Plan section

  18. 77 FR 14272 - Review and Approval of Projects

    Science.gov (United States)

    2012-03-09

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects CFR Correction In Title 18 of the Code of Federal Regulations, Part 400 to End, revised as of April 1, 2011, on page 118, in Sec. 806.6, (b)(1)(i) and (ii) are removed. [FR Doc. 2012-5837 Filed 3-8-12; 8:45 am] BILLING...

  19. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 1

    International Nuclear Information System (INIS)

    Lambert, K.A.; Mitchell, M.M.; Jean, D.; Brown, C.; Byrd, C.S.

    1997-09-01

    This report describes the survey and removal of radioactive surface contamination at Sandia's Environmental Restoration (ER) sites. Radiological characterization was performed as a prerequisite to beginning the Resource Conservation and Recovery Act (RCRA) corrective action process. The removal of radioactive surface contamination was performed in order to reduce potential impacts to human health and the environment. The predominant radiological contaminant of concern was depleted uranium (DU). Between October 1993 and November 1996 scanning surface radiation surveys, using gamma scintillometers, were conducted at 65 sites covering approximately 908 acres. A total of 9,518 radiation anomalies were detected at 38 sites. Cleanup activities were conducted between October 1994 and November 1996. A total of 9,122 anomalies were removed and 2,072 waste drums were generated. The majority of anomalies not removed were associated with a site that has subsurface contamination beyond the scope of this project. Verification soil samples (1,008 total samples) were collected from anomalies during cleanup activities and confirm that the soil concentration achieved in the field were far below the target cleanup level of 230 pCi/g of U-238 (the primary constituent of DU) in the soil. Cleanup was completed at 21 sites and no further radiological action is required. Seventeen sites were not completed since cleanup activities wee precluded by ongoing site activity or were beyond the original project scope

  20. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Lambert, K.A.; Mitchell, M.M. [Brown and Root Environmental, Albuquerque, NM (United States); Jean, D. [MDM/Lamb, Inc., Albuquerque, NM (United States); Brown, C. [Environmental Dimensions, Inc., Albuquerque, NM 87109 (United States); Byrd, C.S. [Sandia National Labs., Albuquerque, NM (United States)

    1997-09-01

    This report describes the survey and removal of radioactive surface contamination at Sandia`s Environmental Restoration (ER) sites. Radiological characterization was performed as a prerequisite to beginning the Resource Conservation and Recovery Act (RCRA) corrective action process. The removal of radioactive surface contamination was performed in order to reduce potential impacts to human health and the environment. The predominant radiological contaminant of concern was depleted uranium (DU). Between October 1993 and November 1996 scanning surface radiation surveys, using gamma scintillometers, were conducted at 65 sites covering approximately 908 acres. A total of 9,518 radiation anomalies were detected at 38 sites. Cleanup activities were conducted between October 1994 and November 1996. A total of 9,122 anomalies were removed and 2,072 waste drums were generated. The majority of anomalies not removed were associated with a site that has subsurface contamination beyond the scope of this project. Verification soil samples (1,008 total samples) were collected from anomalies during cleanup activities and confirm that the soil concentration achieved in the field were far below the target cleanup level of 230 pCi/g of U-238 (the primary constituent of DU) in the soil. Cleanup was completed at 21 sites and no further radiological action is required. Seventeen sites were not completed since cleanup activities wee precluded by ongoing site activity or were beyond the original project scope.

  1. Small Systems Use of a Solid Arsenic Oxidizing Media in Place of Chemical Oxidation to Enhance Arsenic Removal

    Science.gov (United States)

    Presentation provides information on the need to oxidize As III to As V to increase arsenic removal followed by information on the results of an arsenic demonstration project (Plainview CDS) using a solid oxidizing media (Filox) to oxidize As III. The presentation includes a sho...

  2. Predator removal enhances waterbird restoration in Chesapeake Bay (Maryland)

    Science.gov (United States)

    Erwin, R. Michael; McGowan, Peter C.; Reese, Jan

    2011-01-01

    This report represents an update to an earlier report(Erwin et al. 2007a) on wildlife restoration on the largest dredge material island project in the United States underway in Talbot County, Maryland (Figure 1) in the mid–Chesapeake Bay region, referred to as the Paul Sarbanes Ecosystem Restoration Project at Poplar Island (www.nab.usace.army.mil/projects/Maryland/PoplarIsland/documents.html). An important component of this largescale restoration effort focused on water birds, as many of these species have undergone significant declines in the Chesapeake region over the past 30 years (Erwin et al. 2007b). The priority waterbird species include common terns (Sterna hirundo), least terns (S. antillarum), snowy egrets (Egretta thula), and ospreys (Pandion haliaetus). Although significant numbers of common terns (more than 800 pairs in 2003), least terns (62 pairs in 2003), snowy egrets (50 or more pairs by 2005), and ospreys (7 to 10 pairs) have nested on Poplar Island since early 2000, tern productivity especially had been strongly limited by a combination of red fox (Vulpes vulpes) and great horned owl (Bubo virginianus) predation. Fox trapping began in 2004, and four were removed that year; no more evidence of fox presence was found in 2005 or subsequently. The owls proved to be more problematic.

  3. Nuclear waste inventory characterization for mixer pumps and long length equipment removed from Hanford waste tanks

    International Nuclear Information System (INIS)

    Troyer, G.L.

    1998-01-01

    The removal and disposition of contaminated equipment from Hanford high-level nuclear waste tanks presents many challenges. One of which is the characterization of radioactive contaminants on components after removal. A defensible assessment of the radionuclide inventory of the components is required for disposal packaging and classification. As examples of this process, this paper discusses two projects: the withdrawal of thermocouple instrument tubes from Tank 101-AZ, and preparation for eventual replacement of the hydrogen mitigation mixer pump in Tank 101-SY. Emphasis is on the shielding analysis that supported the design of radiation detection systems and the interpolation of data recorded during the equipment retrieval operations

  4. Full-scale production of VFAs from sewage sludge by anaerobic alkaline fermentation to improve biological nutrients removal in domestic wastewater.

    Science.gov (United States)

    Liu, He; Han, Peng; Liu, Hongbo; Zhou, Guangjie; Fu, Bo; Zheng, Zhiyong

    2018-07-01

    A full-scale project of thermal-alkaline pretreatment and alkaline fermentation of sewage sludge was built to produce volatile fatty acids (VFAs) which was then used as external carbon source for improving biological nitrogen and phosphorus removals (BNPR) in wastewater plant. Results showed this project had efficient and stable performances in VFA production, sludge reduce and BNPR. Hydrolysis rate in pretreatment, VFAs yield in fermentation and total VS reduction reached 68.7%, 261.32 mg COD/g VSS and 54.19%, respectively. Moreover, fermentation liquid with VFA presented similar efficiency as acetic acid in enhancing BNPR, obtaining removal efficiencies of nitrogen and phosphorus up to 72.39% and 89.65%, respectively. Finally, the project also presented greater economic advantage than traditional processes, and the net profits for VFAs and biogas productions are 9.12 and 3.71 USD/m 3 sludge, respectively. Long-term operation indicated that anaerobic alkaline fermentation for VFAs production is technically and economically feasible for sludge carbon recovery. Copyright © 2018 Elsevier Ltd. All rights reserved.

  5. High efficiency environmental sampling with UV-cured peelable coatings (aka NuGoo project)

    Energy Technology Data Exchange (ETDEWEB)

    Henzl, Vladimir [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Junghans, Sylvia Ann [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Lakis, Rollin Evan [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-11-21

    This report presents slides on CA Related Project (FY13-17); Environmental sampling by IAEA (not only) during CA; Decontamination gels; Cotton swipes vs. decon gel (FY15); Contamination removal study; The origins of the NuGoo; NuGoo – proof of concept; NuGoo – FY17 project ($250K); LED lamp – which one works and why; Selecting photoinitiator; Monomers and oligomers; Results.

  6. Arsenic/Radium Removal from Drinking Water by the HMO Process, U.S. EPA Demonstration Project at Greenville, WI

    Science.gov (United States)

    In 2003, the Town of Greenville, Wisconsin was selected for the Round 2 U.S. Environmental Protection Agency (EPA) Arsenic Demonstration Program and a Kinetico Macrolite® pressure filtration system was selected for its ability to remove arsenic. Well reconstruction prior to the ...

  7. K25/K27 Characterization for Demonstrating Criticality Incredibility K-25 / K-27 D and D Project

    International Nuclear Information System (INIS)

    Haghighi, Mahmoud H.; Howe, Kathleen E.; Chandler, John R.

    2008-01-01

    The K-25 and K-27 Buildings are currently undergoing decontamination and decommissioning (D and D) as part of a non-time critical removal action. When the enrichment process was shut-down, the process gas equipment and piping was purged to remove UF 6 , but the process gas system was not generally chemically treated to remove solid holdup. Generally, chemical treatment was completed it was not very effective in removing the larger deposits. Because of this, uranium deposits continue to reside throughout the process gas system. There is the potential for unreacted UF 6 to be present, as well. A key part of this project is to locate the remaining significant uranium deposits and manage them appropriately. Since some process gas components in the K-25 and K-27 Buildings contain enriched uranium holdup, it is important to ensure nuclear criticality safety during demolition or subsequent loading and transport of waste. Therefore, a major task in preparation for demolition is to demonstrate that 'criticality is incredible (CI)' in each building area. The U.S. Department of Energy (DOE) and Bechtel Jacobs Company LLC (BJC) are in agreement that proper and thorough characterization of fissile holdup material in the K-25 and K-27 process gas components is a key element in achieving and demonstrating that criticality is incredible, as well as in management of demolition wastes and collection of holdup material. While the classic project scheduling wisdom may indicate that performing all of the data quality objectives (DQO) and planning before the field work starts, the size of the K-25 / K-27 D and D Project combined with the evolving decommissioning plans and re-plans have indicated that a fresh look at what further characterization data are needed to meet the current project requirements. Performing a DQO in the middle of the project allowed a much greater degree of accuracy of the real project data needs than was possible even 22 months ago. The outcome of the DQO work

  8. HSAPS market analysis project

    Energy Technology Data Exchange (ETDEWEB)

    Gloeckner, Ronny; Aaberg, Rolf Jarle

    2006-12-15

    The H-SAPS (Hydrogen Stand-Alone Power System) project, an EU project within the ALTENER programme in the period 2002-2004, was initiated to determine the potential for the introduction of environmentally benign hydrogen technology in what is believed to be a near-term market, namely stand-alone power systems (SAPS). The objective of the project was to examine the technological, political, social and economical factors affecting the emergence of hydrogen technology in the stand-alone power system market today and in the future. The scope of the project was limited to small and medium sized stand-alone power systems, up to a few hundred kilowatts (kW) power rating and based on renewable energy as the primary energy source. The work was divided into five phases: (1) Inception, (2) Data collection and analysis, (3) Market analysis and barrier removal, (4) Dissemination, and (5) Final report. Separate reports were written on these topics, and later summarised this final report. The H-SAPS-project identified the following critical technical barriers (in prioritized order): (1) High costs of both electrolyser and fuel cell solutions, (2) Short lifetime warranties and little lifetime experience for PEM electrolysers and PEM fuel cells, (3) Low energy efficiency of the hydrogen energy system (critical for small systems), and (4) The need to develop easy-to-use and energy efficient gas and electricity control systems. One of the main conclusions from the project is that there is a need to focus on interim solutions, based on conventional energy technologies (e.g., internal combustion engines instead of fuel cells), in order for H-SAPS to compete in the near-term SAPS-market (author) (ml)

  9. HSAPS market analysis project

    International Nuclear Information System (INIS)

    Gloeckner, Ronny; Aaberg, Rolf Jarle

    2006-12-01

    The H-SAPS (Hydrogen Stand-Alone Power System) project, an EU project within the ALTENER programme in the period 2002-2004, was initiated to determine the potential for the introduction of environmentally benign hydrogen technology in what is believed to be a near-term market, namely stand-alone power systems (SAPS). The objective of the project was to examine the technological, political, social and economical factors affecting the emergence of hydrogen technology in the stand-alone power system market today and in the future. The scope of the project was limited to small and medium sized stand-alone power systems, up to a few hundred kilowatts (kW) power rating and based on renewable energy as the primary energy source. The work was divided into five phases: (1) Inception, (2) Data collection and analysis, (3) Market analysis and barrier removal, (4) Dissemination, and (5) Final report. Separate reports were written on these topics, and later summarised this final report. The H-SAPS-project identified the following critical technical barriers (in prioritized order): (1) High costs of both electrolyser and fuel cell solutions, (2) Short lifetime warranties and little lifetime experience for PEM electrolysers and PEM fuel cells, (3) Low energy efficiency of the hydrogen energy system (critical for small systems), and (4) The need to develop easy-to-use and energy efficient gas and electricity control systems. One of the main conclusions from the project is that there is a need to focus on interim solutions, based on conventional energy technologies (e.g., internal combustion engines instead of fuel cells), in order for H-SAPS to compete in the near-term SAPS-market (author) (ml)

  10. K basins sludge removal sludge pretreatment system

    International Nuclear Information System (INIS)

    Chang, H.L.

    1997-01-01

    The Spent Nuclear Fuels Program is in the process of planning activities to remove spent nuclear fuel and other materials from the 100-K Basins as a remediation effort for clean closure. The 105 K- East and K-West Basins store spent fuel, sludge, and debris. Sludge has accumulated in the 1 00 K Basins as a result of fuel oxidation and a slight amount of general debris being deposited, by settling, in the basin water. The ultimate intent in removing the sludge and fuel is to eliminate the environmental risk posed by storing fuel at the K Basins. The task for this project is to disposition specific constituents of sludge (metallic fuel) to produce a product stream through a pretreatment process that will meet the requirements, including a final particle size acceptable to the Tank Waste Remediation System (TWRS). The purpose of this task is to develop a preconceptual design package for the K Basin sludge pretreatment system. The process equipment/system is at a preconceptual stage, as shown in sketch ES-SNF-01 , while a more refined process system and material/energy balances are ongoing (all sketches are shown in Appendix C). Thus, the overall process and 0535 associated equipment have been conservatively selected and sized, respectively, to establish the cost basis and equipment layout as shown in sketches ES- SNF-02 through 08

  11. The average carbon-stock approach for small-scale CDM AR projects

    Energy Technology Data Exchange (ETDEWEB)

    Garcia Quijano, J.F.; Muys, B. [Katholieke Universiteit Leuven, Laboratory for Forest, Nature and Landscape Research, Leuven (Belgium); Schlamadinger, B. [Joanneum Research Forschungsgesellschaft mbH, Institute for Energy Research, Graz (Austria); Emmer, I. [Face Foundation, Arnhem (Netherlands); Somogyi, Z. [Forest Research Institute, Budapest (Hungary); Bird, D.N. [Woodrising Consulting Inc., Belfountain, Ontario (Canada)

    2004-06-15

    In many afforestation and reforestation (AR) projects harvesting with stand regeneration forms an integral part of the silvicultural system and satisfies local timber and/or fuelwood demand. Especially clear-cut harvesting will lead to an abrupt and significant reduction of carbon stocks. The smaller the project, the more significant the fluctuations of the carbon stocks may be. In the extreme case a small-scale project could consist of a single forest stand. In such case, all accounted carbon may be removed during a harvesting operation and the time-path of carbon stocks will typically look as in the hypothetical example presented in the report. For the aggregate of many such small-scale projects there will be a constant benefit to the atmosphere during the projects, due to averaging effects.

  12. Cesium Ion Exchange Program at the Hanford River Protection Project Waste Treatment Plant

    International Nuclear Information System (INIS)

    CHARLES, NASH

    2004-01-01

    The River Protection Project - Hanford Tank Waste Treatment and Immobilization Plant will use cesium ion exchange to remove 137Cs from Low Activity Waste down to 0.3 Ci/m3 in the Immobilized LAW, ILAW product. The project baseline for cesium ion exchange is the elutable SuperLig, R, 644, SL-644, resin registered trademark of IBC Advanced Technologies, Inc., American Fork, UT or the Department of Energy approved equivalent. SL-644 is solely available through IBC Advanced Technologies. To provide an alternative to this sole-source resin supply, the RPP--WTP initiated a three-stage process for selection and qualification of an alternative ion exchange resin for cesium removal in the RPPWTP. It was recommended that resorcinol formaldehyde RF be pursued as a potential alternative to SL-644

  13. Technical bases for the use of CIF3 in the MSRE reactive gas removal project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Trowbridge, L.D.

    1997-06-01

    Nearly impermeable, non-volatile deposits in the Molten Salt Reactor Experiment (MSRE) off-gas piping are impeding the removal of reactive gases from that system. The deposits almost certainly consist of reduced uranium fluorides or of uranium oxyfluorides. Treatment with ClF 3 is a non-intrusive method capable of chemically converting these compounds back to UF 6 , which can then be removed as a gas. This report discusses the technical bases for the use of ClF 3 treatments in this system. A variety of issues are examined, and where the necessary information exists or has been developed, the resolution discussed. The more important of these issues include the efficacy of ClF 3 at deposit removal under the conditions imposed by the MSRE system, materials compatibility of ClF 3 and its reaction products, and operational differences in the Reactive Gas Removal System imposed by the presence of ClF 3 and its products

  14. The outline of Cs removal technology by dry process and the report of entrusted business of verification survey of the technology that removes Cs from contaminated wastes to civil work materials at temporary plant in the Warabidaira region in Iitate village

    International Nuclear Information System (INIS)

    Honma, Kenichi; Takano, Hiroyuki; Kobayashi, Wataru; Sasaki, Tadashi; Takahashi, Yuji; Shinano, Takuro; Hatta, Tamao; Manpuku, Yuuzou; Usui, Jiro

    2016-01-01

    The authors have developed a heat treatment method for removed soil from land clean-up operations and incinerator ash which contain radioactive contaminants. The proposed method removes Cs by volatilization to produce reusable materials satisfying the clearance level, while reducing the volume of radioactive Cs contaminated waste by concentration. A simulative experiment using artificial soil onto which non-radioactive Cs was adsorbed showed that Cs removal rate, which was very low when the soil was heat treated with no additives or with a simple addition of CaCl_2 as a promoter chloride, could increase significantly by adding inorganic high-performance accelerators developed by the authors to the soil. Based on the findings from the experiment, verification projects were carried out jointly with the public sector, using contaminated soil sample from the field and sewage sludge ash from an incinerator. It was demonstrated in the joint projects that radioactive Cs content in the contaminated soil or sewage sludge ash was successfully reduced from the order of tens of thousands Bq/kg to below 100 Bq/kg which was the clearance level, and that the obtained product satisfied requirements in the specifications for fill soil, subbase material and many other civil work materials. As a result of verification, a temporary demonstration plant was built in the Warabidaira region in Iitate Village, Fukushima. Its operation starts in April 2016 for further verification in which the removed soil from the village and the incinerator ash from an adjacent facility are heat treated by the proposed method and recycled into civil work materials for reuse. (author)

  15. Experience on the removal of impurities from liquid metal systems by cold-trapping

    Energy Technology Data Exchange (ETDEWEB)

    Bray, J. A.

    1963-10-15

    Experience in impurity removal by cold-trapping, which was obtained on DFR and its associated liquid metal rigs, is reviewed. The development of the present DFR cold-trapping system is outlined, and the operation of the additional pumped loops, which were required in order to control the reactor impurity levels, are described. Operation of the liquid metal rigs ancillary to the reactor project is discussed with particular reference to the control of impurity levels. (auth)

  16. The effects of student self-assessment on learning in removable prosthodontics laboratory.

    Science.gov (United States)

    Chambers, David W; LaBarre, Eugene E

    2014-05-01

    It has been consistently shown that there is a weak association between student self-assessment and faculty member assessment of student projects in preclinical technique laboratory settings and that students overestimate their performance. Greater overestimation is observed among students judged by faculty to be the weakest, and these students also use a wider range of scores. This study hypothesized that student self-assessment is a function of capacity to perform, accuracy of understanding grading standards, and psychological factors. Further it hypothesized that learning, defined as change in performance, is a function of ability and self-assessment. Dental students at one U.S. dental school self-assessed their performance on two projects in a removable prosthodontics laboratory course separated by a six-month period. Faculty evaluations of these projects were used to determine students' understanding of the criteria for the projects, and a standardized psychological test was used to assess the learning orientation of the students. A statistical correction was made for the artifact of regression toward the mean. The study found that self-assessment was a better predictor of future learning under these circumstances than was evaluation by faculty members.

  17. Selective cesium and strontium removal for TRU-liquid waste including fission products and concentrated nitric acids

    International Nuclear Information System (INIS)

    Mimori, T.; Miyajima, K.; Kozeki, M.; Kubota, T.; Tusa, E.; Keskinen, A.

    1996-01-01

    A nuclide removal system was designed for treatment of liquid radioactive waste at the Japan Atomic Energy Research Institute (JAERI) Tokai site. Total system will include removal of plutonium, cesium and strontium. Removal of plutonium will be carried out by a method developed by JAERI. Removal of cesium and strontium will be carried out by the methods developed in Finland. The whole project will be implemented for JAERI in cooperation between Mitsui Engineering and Shipbuilding and IVO International. This project has been carried out under the Science and Technology Agency (STA) of Japan. The liquid to be treated includes 7.4x10 9 Bq/L of cesium and 7.4x10 9 Bq/L of strontium. The amount of alpha nuclides is 3.7x10 6 Bq/L. Nitric acid concentration is 1.74 mol/L. The volume of 11,000 liters had to be treated in 200 batches of operation. Removal of cesium and strontium is based on the use of new ion exchange materials developed in Finland. These inorganic ion exchange materials have extremely good properties to separate cesium and strontium from even very difficult liquids. Ion exchange material will be used in columns, where there are materials both for cesium and strontium. According to column tests with simulated waste, one 2 liter column will effectively reach the required DF during 10 batches of operation. Purified liquid can be led to further liquid treatment at the site. After treatment of liquids, both used particle filters and used ion exchange columns will be drained and stored to wait for final treatment and disposal. The designed treatment system has a special beneficial feature as it does not produce secondary waste. Final waste is in the form of particle filters or ion exchange columns with material. Used ion exchange columns and filters will be replaced with new ones by means of remote handling. Construction of the treatment system will be scheduled to commence in FY1995 and assemblying at the site in FY1996. (J.P.N.)

  18. The effect of redshift-space distortions on projected 2-pt clustering measurements

    OpenAIRE

    Nock, Kelly; Percival, Will J.; Ross, Ashley J.

    2010-01-01

    Although redshift-space distortions only affect inferred distances and not angles, they still distort the projected angular clustering of galaxy samples selected using redshift dependent quantities. From an Eulerian view-point, this effect is caused by the apparent movement of galaxies into or out of the sample. From a Lagrangian view-point, we find that projecting the redshift-space overdensity field over a finite radial distance does not remove all the anisotropic distortions. We investigat...

  19. Investigating the removal of body piercings.

    Science.gov (United States)

    Armstrong, Myrna L; Roberts, Alden E; Koch, Jerome R; Saunders, Jana C; Owen, Donna C

    2007-05-01

    Although body piercing procurement continues to increase, 13% to 18% of them are removed. Reasons for piercing removal in college students were examined with three groups: (a) those who kept all their piercings, (b) those who removed some, or (c) those who removed all of their body piercings. Of the sample, 41% were still pierced; 50% in their lifetime. Their major purpose for the body piercing was "helped them feel unique." Females obtained more (in high school) and then removed more, usually as upperclassmen. Males and females reported themselves as risk takers at procedure time and currently; however, only 10% cited deviancy as a reason for the body piercing(s). Only removal elements of "I just got tired of it" and "I just decided to remove it" were present, especially with the Some Removed Group. Further examination of body piercing building personal distinctiveness and self-identity to promote their need of uniqueness is suggested.

  20. Probabilistic Determination of Green Infrastructure Pollutant Removal Rates from the International Stormwater BMP Database

    Science.gov (United States)

    Gilliom, R.; Hogue, T. S.; McCray, J. E.

    2017-12-01

    There is a need for improved parameterization of stormwater best management practices (BMP) performance estimates to improve modeling of urban hydrology, planning and design of green infrastructure projects, and water quality crediting for stormwater management. Percent removal is commonly used to estimate BMP pollutant removal efficiency, but there is general agreement that this approach has significant uncertainties and is easily affected by site-specific factors. Additionally, some fraction of monitored BMPs have negative percent removal, so it is important to understand the probability that a BMP will provide the desired water quality function versus exacerbating water quality problems. The widely used k-C* equation has shown to provide a more adaptable and accurate method to model BMP contaminant attenuation, and previous work has begun to evaluate the strengths and weaknesses of the k-C* method. However, no systematic method exists for obtaining first-order removal rate constants needed to use the k-C* equation for stormwater BMPs; thus there is minimal application of the method. The current research analyzes existing water quality data in the International Stormwater BMP Database to provide screening-level parameterization of the k-C* equation for selected BMP types and analysis of factors that skew the distribution of efficiency estimates from the database. Results illustrate that while certain BMPs are more likely to provide desired contaminant removal than others, site- and design-specific factors strongly influence performance. For example, bioretention systems show both the highest and lowest removal rates of dissolved copper, total phosphorous, and total nitrogen. Exploration and discussion of this and other findings will inform the application of the probabilistic pollutant removal rate constants. Though data limitations exist, this research will facilitate improved accuracy of BMP modeling and ultimately aid decision-making for stormwater quality

  1. Shippingport station decommissioning project irradiated components transfer: Topical report

    International Nuclear Information System (INIS)

    1988-01-01

    This topical report is a synopsis of the transfer of irradiated components into the Shippingport Reactor Pressure Vessel (RPV) performed at the Shippingport Station Decommissioning Project (SSDP). The information is provided as a part of the Technology Transfer Program to document the preparation activities for the decommissioning of a nuclear power reactor to be removed in one piece

  2. ALPHA - The long-term passive decay heat removal and aerosol retention program

    International Nuclear Information System (INIS)

    Guentay, S.; Varadi, G.; Dreier, J.

    1996-01-01

    The Paul Scherrer Institute initiated the major new experimental and analytical program ALPHA in 1990. The program is aimed at understanding the long-term decay heat removal and aerosol questions for the next generation of Passive Light Water Reactors. The ALPHA project currently includes four major items: the large-scale, integral system behaviour test facility PANDA, which will be used to examine multidimensional effects of the SBWR decay heat removal system; an investigation of the thermal hydraulics of natural convection and mixing in pools and large volumes (LINX); a separate-effects study of aerosols transport and deposition in plenum and tubes (AIDA); while finally, data from the PANDA facility and supporting separate effects tests will be used to develop and qualify models and provide validation of relevant system codes. The paper briefly reviews the above four topics and current status of the experimental facilities. (author). 3 refs, 12 figs

  3. ALPHA - The long-term passive decay heat removal and aerosol retention program

    Energy Technology Data Exchange (ETDEWEB)

    Guentay, S; Varadi, G; Dreier, J [Paul Scherrer Inst. (PSI), Villigen (Switzerland)

    1996-12-01

    The Paul Scherrer Institute initiated the major new experimental and analytical program ALPHA in 1990. The program is aimed at understanding the long-term decay heat removal and aerosol questions for the next generation of Passive Light Water Reactors. The ALPHA project currently includes four major items: the large-scale, integral system behaviour test facility PANDA, which will be used to examine multidimensional effects of the SBWR decay heat removal system; an investigation of the thermal hydraulics of natural convection and mixing in pools and large volumes (LINX); a separate-effects study of aerosols transport and deposition in plenum and tubes (AIDA); while finally, data from the PANDA facility and supporting separate effects tests will be used to develop and qualify models and provide validation of relevant system codes. The paper briefly reviews the above four topics and current status of the experimental facilities. (author). 3 refs, 12 figs.

  4. Physical abrasion method using submerged spike balls to remove algal biofilm from photobioreactors.

    Science.gov (United States)

    Nawar, Azra; Khoja, Asif Hussain; Akbar, Naveed; Ansari, Abeera Ayaz; Qayyum, Muneeb; Ali, Ehsan

    2017-12-02

    A major factor in practical application of photobioreactors (PBR) is the adhesion of algal cells onto their inner walls. Optimized algal growth requires an adequate sunlight for the photosynthesis and cell growth. Limitation in light exposure adversely affects the algal biomass yield. The removal of the biofilm from PBR is a challenging and expansive task. This study was designed to develop an inexpensive technique to prevent adhesion of algal biofilm on tubular PBR to ensure high efficiency of light utilization. Rubber balls with surface projections were introduced into the reactor, to remove the adherent biofilm by physical abrasion technique. The floatation of spike balls created a turbulent flow, thereby inhibiting further biofilm formation. The parameters such as, specific growth rate and doubling time of the algae before introducing the balls were 0.451 day -1 and 1.5 days respectively. Visible biofilm impeding light transmission was formed by 15-20 days. The removal of the biofilm commenced immediately after the introduction of the spike balls with visibly reduced deposits in 3 days. This was also validated by enhance cell count (6.95 × 106 cells mL -1 ) in the medium. The employment of spike balls in PBR is an environmental friendly and economical method for the removal of biofilm.

  5. Quantifying the effectiveness of shoreline armoring removal on coastal biota of Puget Sound.

    Science.gov (United States)

    Lee, Timothy S; Toft, Jason D; Cordell, Jeffery R; Dethier, Megan N; Adams, Jeffrey W; Kelly, Ryan P

    2018-01-01

    Shoreline armoring is prevalent around the world with unprecedented human population growth and urbanization along coastal habitats. Armoring structures, such as riprap and bulkheads, that are built to prevent beach erosion and protect coastal infrastructure from storms and flooding can cause deterioration of habitats for migratory fish species, disrupt aquatic-terrestrial connectivity, and reduce overall coastal ecosystem health. Relative to armored shorelines, natural shorelines retain valuable habitats for macroinvertebrates and other coastal biota. One question is whether the impacts of armoring are reversible, allowing restoration via armoring removal and related actions of sediment nourishment and replanting of native riparian vegetation. Armoring removal is targeted as a viable option for restoring some habitat functions, but few assessments of coastal biota response exist. Here, we use opportunistic sampling of pre- and post-restoration data for five biotic measures (wrack % cover, saltmarsh % cover, number of logs, and macroinvertebrate abundance and richness) from a set of six restored sites in Puget Sound, WA, USA. This broad suite of ecosystem metrics responded strongly and positively to armor removal, and these results were evident after less than one year. Restoration responses remained positive and statistically significant across different shoreline elevations and temporal trajectories. This analysis shows that removing shoreline armoring is effective for restoration projects aimed at improving the health and productivity of coastal ecosystems, and these results may be widely applicable.

  6. Quantifying the effectiveness of shoreline armoring removal on coastal biota of Puget Sound

    Directory of Open Access Journals (Sweden)

    Timothy S. Lee

    2018-02-01

    Full Text Available Shoreline armoring is prevalent around the world with unprecedented human population growth and urbanization along coastal habitats. Armoring structures, such as riprap and bulkheads, that are built to prevent beach erosion and protect coastal infrastructure from storms and flooding can cause deterioration of habitats for migratory fish species, disrupt aquatic–terrestrial connectivity, and reduce overall coastal ecosystem health. Relative to armored shorelines, natural shorelines retain valuable habitats for macroinvertebrates and other coastal biota. One question is whether the impacts of armoring are reversible, allowing restoration via armoring removal and related actions of sediment nourishment and replanting of native riparian vegetation. Armoring removal is targeted as a viable option for restoring some habitat functions, but few assessments of coastal biota response exist. Here, we use opportunistic sampling of pre- and post-restoration data for five biotic measures (wrack % cover, saltmarsh % cover, number of logs, and macroinvertebrate abundance and richness from a set of six restored sites in Puget Sound, WA, USA. This broad suite of ecosystem metrics responded strongly and positively to armor removal, and these results were evident after less than one year. Restoration responses remained positive and statistically significant across different shoreline elevations and temporal trajectories. This analysis shows that removing shoreline armoring is effective for restoration projects aimed at improving the health and productivity of coastal ecosystems, and these results may be widely applicable.

  7. Investigation of wild caught whitefish, Coregonus lavaretus (L.), for infection with viral haemorrhagic septicaemia virus (VHSV) and experimental challenge of whitefish with VHSV

    DEFF Research Database (Denmark)

    Skall, Helle Frank; Kjær, Torben Egil; Olesen, Niels Jørgen

    2004-01-01

    One hundred and forty-eight wild whitefish, Coregonus lavaretus (L.), were caught by electrofishing and sampled for virological examination in December 1999 and 2000, during migration from the brackish water feeding grounds to the freshwater spawning grounds, where the whitefish may come into con......One hundred and forty-eight wild whitefish, Coregonus lavaretus (L.), were caught by electrofishing and sampled for virological examination in December 1999 and 2000, during migration from the brackish water feeding grounds to the freshwater spawning grounds, where the whitefish may come...... with approximately 20% mortality, whereas the marine isolate was virtually non-pathogenic. At the end of the experiment it was possible to isolate VHSV from survivors infected with the marine and suspected marine isolates. Because of the low infection rate in wild whitefish in Denmark, the role of whitefish...

  8. Removal site evaluation report on Building 7602 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    This removal site evaluation report for Building 7602 at Oak Ridge National Laboratory was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the facility pose a substantial risk to human health or the environment (i.e., a high probability of adverse effects) and whether remedial site evaluations or removal actions are, therefore, required. The scope of the project included (1) a search for, and review of, readily available historical records regarding operations and use of the facility (including hazardous substance usage and existing contamination); (2) interviews with facility personnel concerning current and past practices; and (3) a brief walk-through to visually inspect the facility and identify existing hazard areas requiring maintenance actions, removal actions, or remedial evaluation. The results of the removal site evaluation indicate that areas associated with Building 7602 pose no imminent hazards requiring maintenance actions. Adequate engineering and administrative controls are in place and enforced within the facility to ensure worker and environmental protection. Current actions that are being taken to prevent further release of contamination and ensure worker safety within Building 7602 are considered adequate until decontamination and decommissioning activities begin. Given the current status and condition of Building 7602, this removal site evaluation is considered complete and terminated

  9. Scale analysis of decay heat removal system between HTR-10 and HTR-PM reactors under accidental conditions

    International Nuclear Information System (INIS)

    Roberto, Thiago D.; Alvim, Antonio C.M.

    2017-01-01

    The 10 MW high-temperature gas-cooled test module (HTR-10) is a graphite-moderated and helium-cooled pebble bed reactor prototype that was designed to demonstrate the technical and safety feasibility of this type of reactor project under normal and accidental conditions. In addition, one of the systems responsible for ensuring the safe operation of this type of reactor is the passive decay heat removal system (DHRS), which operates using passive heat removal processes. A demonstration of the heat removal capacity of the DHRS under accidental conditions was analyzed based on a benchmark problem for design-based accidents on an HTR-10, i.e., the pressurized loss of forced cooling (PLOFC) described in technical reports produced by the International Atomic Energy Agency. In fact, the HTR-10 is also a proof-of-concept reactor for the high-temperature gas-cooled reactor pebble-bed module (HTR-PM), which generates approximately 25 times more heat than the HTR-10, with a thermal power of 250 MW, thereby requiring a DHRS with a higher system capacity. Thus, because an HTR-10 is a prototype reactor for an HTR-PM, a scaling analysis of the heat transfer process from the reactor to the DHRS was carried out between the HTR-10 and HTR-PM systems to verify the distortions of scale and the differences between the main dimensionless numbers from the two projects. (author)

  10. Scale analysis of decay heat removal system between HTR-10 and HTR-PM reactors under accidental conditions

    Energy Technology Data Exchange (ETDEWEB)

    Roberto, Thiago D.; Alvim, Antonio C.M. [Coordenacao de Pos-Graduacao e Pesquisa de Engenharia (PEN/COPPE/UFRJ), Rio de Janeiro, RJ (Brazil). Programa de Engenharia Nuclear; Lapa, Celso M.F., E-mail: thiagodbtr@gmail.com, E-mail: lapa@ien.gov.br, E-mail: alvim@nuclear.ufrj.br [Instituto de Engenharia Nuclear (IEN/CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2017-07-01

    The 10 MW high-temperature gas-cooled test module (HTR-10) is a graphite-moderated and helium-cooled pebble bed reactor prototype that was designed to demonstrate the technical and safety feasibility of this type of reactor project under normal and accidental conditions. In addition, one of the systems responsible for ensuring the safe operation of this type of reactor is the passive decay heat removal system (DHRS), which operates using passive heat removal processes. A demonstration of the heat removal capacity of the DHRS under accidental conditions was analyzed based on a benchmark problem for design-based accidents on an HTR-10, i.e., the pressurized loss of forced cooling (PLOFC) described in technical reports produced by the International Atomic Energy Agency. In fact, the HTR-10 is also a proof-of-concept reactor for the high-temperature gas-cooled reactor pebble-bed module (HTR-PM), which generates approximately 25 times more heat than the HTR-10, with a thermal power of 250 MW, thereby requiring a DHRS with a higher system capacity. Thus, because an HTR-10 is a prototype reactor for an HTR-PM, a scaling analysis of the heat transfer process from the reactor to the DHRS was carried out between the HTR-10 and HTR-PM systems to verify the distortions of scale and the differences between the main dimensionless numbers from the two projects. (author)

  11. Integrated Removal of NOx with Carbon Monoxide as Reductant, and Capture of Mercury in a Low Temperature Selective Catalytic and Adsorptive Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Neville Pinto; Panagiotis Smirniotis; Stephen Thiel

    2010-08-31

    Coal will likely continue to be a dominant component of power generation in the foreseeable future. This project addresses the issue of environmental compliance for two important pollutants: NO{sub x} and mercury. Integration of emission control units is in principle possible through a Low Temperature Selective Catalytic and Adsorptive Reactor (LTSCAR) in which NO{sub x} removal is achieved in a traditional SCR mode but at low temperature, and, uniquely, using carbon monoxide as a reductant. The capture of mercury is integrated into the same process unit. Such an arrangement would reduce mercury removal costs significantly, and provide improved control for the ultimate disposal of mercury. The work completed in this project demonstrates that the use of CO as a reductant in LTSCR is technically feasible using supported manganese oxide catalysts, that the simultaneous warm-gas capture of elemental and oxidized mercury is technically feasible using both nanostructured chelating adsorbents and ceria-titania-based materials, and that integrated removal of mercury and NO{sub x} is technically feasible using ceria-titania-based materials.

  12. 27 CFR 25.251 - Authorized removals.

    Science.gov (United States)

    2010-04-01

    ..., DEPARTMENT OF THE TREASURY LIQUORS BEER Removal of Brewer's Yeast and Other Articles § 25.251 Authorized removals. (a) Brewer's yeast. A brewer may remove brewer's yeast, in liquid or solid form containing not... including the words “Brewer's Yeast.” (c) Pipeline. If brewer's yeast is removed by pipeline, the pipeline...

  13. Advanced Flue Gas Desulfurization (AFGD) demonstration project: Volume 2, Project performance and economics. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-30

    The project objective is to demonstrate removal of 90--95% or more of the SO{sub 2} at approximately one-half the cost of conventional scrubbing technology; and to demonstrate significant reduction of space requirements. In this project, Pure Air has built a single SO{sub 2} absorber for a 528-MWe power plant. The absorber performs three functions in a single vessel: prequencher, absorber, and oxidation of sludge to gypsum. Additionally, the absorber is of a co- current design, in which the flue gas and scrubbing slurry move in the same direction and at a relatively high velocity compared to conventional scrubbers. These features all combine to yield a state- of-the-art SO{sub 2} absorber that is more compact and less expensive than conventional scrubbers. The project incorporated a number of technical features including the injection of pulverized limestone directly into the absorber, a device called an air rotary sparger located within the base of the absorber, and a novel wastewater evaporation system. The air rotary sparger combines the functions of agitation and air distribution into one piece of equipment to facilitate the oxidation of calcium sulfite to gypsum. Additionally, wastewater treatment is being demonstrated to minimize water disposal problems inherent in many high-chloride coals. Bituminous coals primarily from the Indiana, Illinois coal basin containing 2--4.5% sulfur were tested during the demonstration. The Advanced Flue Gas Desulfurization (AFGD) process has demonstrated removal of 95% or more of the SO{sub 2} while providing a commercial gypsum by-product in lieu of solid waste. A portion of the commercial gypsum is being agglomerated into a product known as PowerChip{reg_sign} gypsum which exhibits improved physical properties, easier flowability and more user friendly handling characteristics to enhance its transportation and marketability to gypsum end-users.

  14. Establishing Trafficking in Human Beings for the Purpose of Organ Removal and Improving Cross-Border Collaboration in Criminal Cases: Recommendations

    OpenAIRE

    Holmes, Paul; Rijken, Conny; D'Orsi, Sergio; Esser, Luuk; Hol, Floor; Gallagher, Anne; Greenberg, Galit; Helberg, Louis; Horvatits, Lisa; McCarthy, Sean; Ratel, Jonathan; Scheper-Hughes, Nancy; Forsythe, John

    2016-01-01

    Abstract In this short summary report on the legal definition of trafficking in human beings for the purpose of organ removal and improving cross-border collaboration in criminal cases, challenges, and recommendations in the areas of defining the crime, criminal investigation and prosecution, and cross-border cooperation are made. These are the outcomes of a working group discussion during the writers' conference of the HOTT project, a European Union-funded project against trafficking in huma...

  15. [Acrylic resin removable partial dentures].

    Science.gov (United States)

    de Baat, C; Witter, D J; Creugers, N H J

    2011-01-01

    An acrylic resin removable partial denture is distinguished from other types of removable partial dentures by an all-acrylic resin base which is, in principle, solely supported by the edentulous regions of the tooth arch and in the maxilla also by the hard palate. When compared to the other types of removable partial dentures, the acrylic resin removable partial denture has 3 favourable aspects: the economic aspect, its aesthetic quality and the ease with which it can be extended and adjusted. Disadvantages are an increased risk of caries developing, gingivitis, periodontal disease, denture stomatitis, alveolar bone reduction, tooth migration, triggering of the gag reflex and damage to the acrylic resin base. Present-day indications are ofa temporary or palliative nature or are motivated by economic factors. Special varieties of the acrylic resin removable partial denture are the spoon denture, the flexible denture fabricated of non-rigid acrylic resin, and the two-piece sectional denture. Furthermore, acrylic resin removable partial dentures can be supplied with clasps or reinforced by fibers or metal wires.

  16. Device for removing impurities from liquid metals

    International Nuclear Information System (INIS)

    Naito, Kesahiro; Yokota, Norikatsu; Shimoyashiki, Shigehiro; Takahashi, Kazuo; Ishida, Tomio.

    1984-01-01

    Purpose: To attain highly reliable and efficient impurity removal by forming temperature distribution the impurity removing device thereby providing the function of corrosion product trap, nuclear fission product trap and cold trap under the conditions suitable to the impurity removing materials. Constitution: The impurity removing device comprises a container containing impurity removing fillers. The fillers comprise material for removing corrosion products, material for removing nuclear fission products and material for removing depositions from liquid sodium. The positions for the respective materials are determined such that the materials are placed under the temperature conditions easy to attain their function depending on the temperature distribution formed in the removing device, whereby appropriate temperature condition is set to each of the materials. (Yoshino, Y.)

  17. VDTT removal system functional design criteria

    International Nuclear Information System (INIS)

    Legare, D.E.

    1996-01-01

    Two Velocity Density Temperature Trees (H-2-815016) are to be removed from risers 14A and 1B of tank 241-SY-101. This document provides functional design criteria for the removal system. The removal system consists of a Liquid Removal Tool, Flexible Receiver (H-2-79216), Burial Container, Transport Trailers, and associated equipment

  18. Formerly utilized MED/AEC sites remedial action program. Removal of a contaminated industrial waste line, Los Alamos, New Mexico. Final report

    International Nuclear Information System (INIS)

    Gunderson, T.C.; Ahlquist, A.J.

    1979-04-01

    In 1977 parts of an abandoned industrial waste line (IWL) that carried laboratory or process chemical and radiochemical wastes were removed from Los Alamos Scientific Laboratory property and from the townsite of Los Alamos in north-central New Mexico. Most of the IWL was removed between 1964 and 1967. Some IWL segments in the townsite, which at that time were buried under newly paved roads, were left for removal during future construction projects involving these roads to minimize traffic problems and road damage, and because they posed no public health hazard. In 1977, prior to impending major road construction in several areas, 400 m (1300 ft) of IWL and two IWL manhole structures were removed from Laboratory and Los Alamos County property. Associated soil contamination was removed to levels considered to be as low as practicable. Contaminated or potentially contaminated material was removed to an approved radioactive waste disposal site on Department of Energy property. Full details of the methods, findings, and as-left conditions are documented in this report

  19. KE Basin monorail modification for the sludge removal and packaging project

    International Nuclear Information System (INIS)

    Orbeta, C.B.

    1995-01-01

    The 105KE Basin currently stores over 1,100 metric tons of various N Reactor spent fuel in several canister forms, as well as several metric tons of sludge which must be removed. Modifications will consist of anchoring a permanent steel frame directly into the pit walls between existing columns and adding two travelling hoist rails, each capable of two directional motions. Each pit will have its own capability for targeting loads to any point inside the working areas of these pits. The structural frame designed for the monorail system at the Weasel and Tech-View pits was qualified as adequate for normal/operating loads, and dead plus live loads combined with seismic loads. The hoist operating live load is limited to 2,000 lb. The physical strength of the existing pit walls where the base plates are to be structurally anchored is unknown. The original structural drawings specified a minimum concrete strength of 3,000 lb/in 2 . A pullout test should be performed to verify the strength of this concrete base. To reduce radiation exposure to levels as low as reasonably achievable (ALARA), installation and erection work inside the basin controlled area must be minimized; therefore, the pieces required for the modifications should be numbered in the fabrication shop, and erection should follow a procedure that corresponds to the assembly sequence indicated by the numbers. In conjunction with final erection, a mock-up activity should be conducted and base-plate locations verified to be within dimensional tolerances

  20. KE Basin monorail modification for the sludge removal and packaging project

    Energy Technology Data Exchange (ETDEWEB)

    Orbeta, C.B.

    1995-02-06

    The 105KE Basin currently stores over 1,100 metric tons of various N Reactor spent fuel in several canister forms, as well as several metric tons of sludge which must be removed. Modifications will consist of anchoring a permanent steel frame directly into the pit walls between existing columns and adding two travelling hoist rails, each capable of two directional motions. Each pit will have its own capability for targeting loads to any point inside the working areas of these pits. The structural frame designed for the monorail system at the Weasel and Tech-View pits was qualified as adequate for normal/operating loads, and dead plus live loads combined with seismic loads. The hoist operating live load is limited to 2,000 lb. The physical strength of the existing pit walls where the base plates are to be structurally anchored is unknown. The original structural drawings specified a minimum concrete strength of 3,000 lb/in{sup 2}. A pullout test should be performed to verify the strength of this concrete base. To reduce radiation exposure to levels as low as reasonably achievable (ALARA), installation and erection work inside the basin controlled area must be minimized; therefore, the pieces required for the modifications should be numbered in the fabrication shop, and erection should follow a procedure that corresponds to the assembly sequence indicated by the numbers. In conjunction with final erection, a mock-up activity should be conducted and base-plate locations verified to be within dimensional tolerances.

  1. Implications of Using Corn Stalks as a Biofuel Source: A Joint ARS and DOE Project

    Science.gov (United States)

    Wilhelm, W. W.; Cushman, J.

    2003-12-01

    Corn stover is a readily source of biomass for cellulosic ethanol production, and may provide additional income for growers. Published research shows that residue removal changes the rate of soil physical, chemical, and biological processes, and in turn, crop growth. Building a sustainable cellulosic ethanol industry based on corn residue requires residue management practices that do not reduce long-term productivity. To develop such systems, impacts of stover removal on the soil and subsequent crops must be quantified. The ARS/DOE Biofuel Project is the cooperative endeavor among scientists from six western Corn Belt US Dept. of Agriculture, Agricultural Research Service (ARS) locations and US Dept. of Energy. The objectives of the project are to determine the influence of stover removal on crop productivity, soil aggregation, quality, carbon content, and seasonal energy balance, and carbon sequestration. When residue is removed soil temperatures fluctuate more and soil water evaporation is greater. Residue removal reduces the amount of soil organic carbon (SOC), but the degree of reduction is highly dependent on degree of tillage, quantity of stover removed, and frequency of stover removal. Of the three cultural factors (stover removal, tillage, and N fertilization) tillage had the greatest effect on amount of corn-derived SOC. No tillage tends to increase the fraction of aggregates in the 2.00 to 0.25 mm size range at all removal rates. Stover harvest reduces corn-derived SOC by 35% compared to retaining stover on the soil averaged over all tillage systems. Corn stover yield has not differed across stover removal treatments in these studies. In the irrigated study, grain yield increased with stover removal. In the rain-fed studies, grain yield has not differed among residue management treatments. Incorporating the biomass ethanol fermentation by-product into a soil with low SOC showed a positive relationship between the amount of lignin added and the subsequent

  2. Techniques for removing contaminated concrete surfaces

    International Nuclear Information System (INIS)

    Halter, J.M.; Sullivan, R.G.

    1981-01-01

    This discussion compares various techniques that have been used to clean concrete surfaces by removing the surface. Three techniques which have been investigated by the Pacific Northwest Laboratory for removing surfaces are also described: the water cannon, the concrete spaller, and high-pressure water jet. The equipment was developed with the assumption that removal of the top 1/8 to 1/4 in. of surface would remove most of the contamination. If the contamination has gone into cracks or deep voids in the surface, the removal processes can be repeated until the surface is acceptable

  3. 78 FR 37840 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-06-24

    ... activities to capture, seine, electrofish, PIT tag, collect vouchers, and preserve larvae) the Razorback... vouchers) the conservancy fairy shrimp (Branchinecta conservatio), longhorn fairy shrimp (Branchinecta longiantenna), Riverside fairy shrimp (Streptocephalus woottoni), San Diego fairy shrimp (Branchinecta...

  4. Reflectance continuum removal spectral index tracking the xanthophyll cycle photoprotective reactions in Norway spruce needles

    Czech Academy of Sciences Publication Activity Database

    Kováč, Daniel; Navrátil, M.; Malenovský, Z.; Štroch, Michal; Špunda, Vladimír; Urban, Otmar

    2012-01-01

    Roč. 39, č. 12 (2012), s. 987-998 ISSN 1445-4408 R&D Projects: GA MŠk(CZ) ED1.1.00/02.0073; GA MŽP(CZ) SP/2D1/70/08 Institutional support: RVO:67179843 Keywords : diurnal course * growth chambers * photosynthetic pigments composition * Picea abies * reflectance continuum removal * xanthophyll cycle Subject RIV: EH - Ecology, Behaviour Impact factor: 2.471, year: 2012

  5. The Bahrain Burial Mound Project

    DEFF Research Database (Denmark)

    Laursen, Steffen; Johansen, Kasper Lambert

    2007-01-01

    the majority of burial mounds have been removed to make way for roads and housing, and in this process about 8000 mounds have been excavated; of these only c. 265 have been published. In 2006 the Bahrain Directorate for Culture & National Heritage and Moesgaard Museum decided on a collaborative project...... process of linking relevant information to the mounds have been initiated in the course of which excavation data of individual monument is being fed into a relational database. Our preliminary study of the digital maps of the mound cemeteries has revealed an abundance of interesting patterns...... that immediately gave rise to puzzling new questions that will direct the future explorations of the project. Of particular interest is a distinctive new type of elite monuments situated to the south of the so-called Royal Mounds in the centre of the island. The newly discovered type of mounds apparently reflect...

  6. Assessment of alternate ion exchange resins for improved antimony removal from the primary heat transport system

    Energy Technology Data Exchange (ETDEWEB)

    Burany, R.; Suryanarayan, S.; Husain, A. [Kinectrics, Inc., Toronto, ON (Canada)

    2015-07-01

    Radiation fields around the CANDU heat transport system are a major contributor to worker dose during inspection, maintenance and refurbishment activities. While Co-60 is typically the dominant contributor to radiation fields in CANDU reactors, Sb-124, an activation product of antimony, is also a significant contributor, accounting for 5-20% of the radiation fields. The goal of this research project was to investigate resins for improved removal of antimony under both oxidizing and reducing conditions.Several candidate resins were tested and short-listed through a sequence of iterative testing. The results of the laboratory testing have identified potential candidates for improved antimony removal. Further testing is required to ensure compatibility with existing station resin specifications. (author)

  7. Ultrasound-guided removal of Implanon devices.

    LENUS (Irish Health Repository)

    Persaud, T

    2008-11-01

    Our study has shown that ultrasound-guided localisation and removal of Implanon rods is safe, practical and highly successful. Over a 4-year period, 119 patients had successful, uncomplicated removal of their subdermal devices.The technique is particularly useful for removal of the device when it is not palpable or when an attempt at removal of a palpable device has not been successful.

  8. Carbon dioxide removal with inorganic membranes

    Energy Technology Data Exchange (ETDEWEB)

    Judkins, R.R.; Fain, D.E. [Oak Ridge National Laboratory, TN (United States)

    1993-12-31

    The increasing concentrations of greenhouse gases, particularly carbon dioxide, in the atmosphere has sparked a great deal of interest in the removal of CO{sub 2} from flue gases of fossil fueled plants. Presently, several techniques for the removal of CO{sub 2} are considered to have potential, but are lacking in practicality. For example, amine scrubbing of flue gas streams is potential, but are lacking in practically. For example, amine scrubbing of flue gas streams is effective in removing CO{sub 2}, but costs are high; efficiency suffers; and other acid gases must be removed prior to amine stripping. Membrane systems for CO{sub 2} removal are held in high regard, and inorganic, particularly ceramic, membranes offer the potential for high temperature, thus energy saving, removal.

  9. Uranium material removing and recovering device

    International Nuclear Information System (INIS)

    Takita, Shin-ichi.

    1997-01-01

    A uranium material removing and recovering device for use in removing surplus uranium heavy metal (UO 2 ) generated in a uranium handling facility comprises a uranium material removing device and a uranium material recovering device. The uranium material removing device comprises an adsorbing portion filled with a uranium adsorbent, a control portion for controlling the uranium adsorbent of the uranium adsorbing portion by a controlling agent, a uranium adsorbing device connected thereto and a jetting device for jetting the adsorbing liquid to equipments deposited with uranium. The recovering device comprises a recovering apparatus for recovering uranium materials deposited with the adsorbent liquid removed by the jetting device and a recovering tank for storing the recovered uranium materials. The device of the present invention can remove surplus uranium simply and safely, mitigate body's load upon removing and recovering operations, facilitate the processing for the exchange of the adsorbent and reduces the radioactive wastes. (T.M.)

  10. Device for removing fur

    International Nuclear Information System (INIS)

    Hanawa, Minoru; Nakagawa, Takao; Sakuma, Toyoo; Yonemura, Eizo.

    1976-01-01

    Purpose: To effectively remove fur adhered to fuel rods and to increase working efficiency without use of a lengthy hose. Constitution: In the fur removing device of the present invention, brushes rotated by gears are provided within a casing so that fur adhered to the fuel rods are removed by the brushes and water is rotatably moved by blades housed therein to outwardly blow fur floating in water by means of a centrifugal force. Then, the fur is filtered by a filter outwardly provided. In this way, the fur may be collected within the device to avoid contamination to others. (Kamimura, M.)

  11. Removal site evaluation report for the Isotope Facilities at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    This removal site evaluation (RmSE) report of the Isotope Facilities at Oak Ridge National Laboratory (ORNL) was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the Isotopes Facility pose a substantial risk to human health or the environment and if remedial site evaluations (RSEs) or removal actions are required. The scope of the project included: (1) a review of historical evidence regarding operations and use of the facility; (2) interviews with facility personnel concerning current and past operating practices; (3) a site inspection; and (4) identification of hazard areas requiring maintenance, removal, or remedial actions. The results of RmSE indicate that no substantial risks exist from contaminants present in the Isotope Facilities because adequate controls and practices exist to protect human health and the environment. The recommended correction from the RmSE are being conducted as maintenance actions; accordingly, this RmSE is considered complete and terminated.

  12. Removal site evaluation report for the Isotope Facilities at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-07-01

    This removal site evaluation (RmSE) report of the Isotope Facilities at Oak Ridge National Laboratory (ORNL) was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the Isotopes Facility pose a substantial risk to human health or the environment and if remedial site evaluations (RSEs) or removal actions are required. The scope of the project included: (1) a review of historical evidence regarding operations and use of the facility; (2) interviews with facility personnel concerning current and past operating practices; (3) a site inspection; and (4) identification of hazard areas requiring maintenance, removal, or remedial actions. The results of RmSE indicate that no substantial risks exist from contaminants present in the Isotope Facilities because adequate controls and practices exist to protect human health and the environment. The recommended correction from the RmSE are being conducted as maintenance actions; accordingly, this RmSE is considered complete and terminated

  13. Quality assurance project plan for the Chestnut Ridge Fly Ash Pond Stabilization Project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-07-01

    The Chestnut Ridge Fly Ash Pond Stabilization (CRFAPS) Project will stabilize a 19-m-high (62-ft-high) earthen embankment across Upper McCoy Branch situated along the southern slope of Chestnut Ridge. This task will be accomplished by raising the crest of the embankment, reinforcing the face of the embankment, removing trees from the face and top of the embankment, and repairing the emergency spillway. The primary responsibilities of the team members are: Lockheed Martin Energy Systems, Inc., (Energy Systems) will be responsible for project integration, technical support, Title 3 field support, environmental oversight, and quality assurance (QA) oversight of the project; Foster Wheeler Environmental Corporation (FWENC) will be responsible for design and home office Title 3 support; MK-Ferguson of Oak Ridge Company (MK-F) will be responsible for health and safety, construction, and procurement of construction materials. Each of the team members has a QA program approved by the US Department of Energy (DOE) Oak Ridge Operations. This project-specific QA project plan (QAPP), which is applicable to all project activities, identifies and integrates the specific QA requirements from the participant's QA programs that are necessary for this project

  14. High Metal Removal Rate Process for Machining Difficult Materials

    Energy Technology Data Exchange (ETDEWEB)

    Bates, Robert; McConnell, Elizabeth

    2016-06-29

    Machining methods across many industries generally require multiple operations to machine and process advanced materials, features with micron precision, and complex shapes. The resulting multiple machining platforms can significantly affect manufacturing cycle time and the precision of the final parts, with a resultant increase in cost and energy consumption. Ultrafast lasers represent a transformative and disruptive technology that removes material with micron precision and in a single step manufacturing process. Such precision results from athermal ablation without modification or damage to the remaining material which is the key differentiator between ultrafast laser technologies and traditional laser technologies or mechanical processes. Athermal ablation without modification or damage to the material eliminates post-processing or multiple manufacturing steps. Combined with the appropriate technology to control the motion of the work piece, ultrafast lasers are excellent candidates to provide breakthrough machining capability for difficult-to-machine materials. At the project onset in early 2012, the project team recognized that substantial effort was necessary to improve the application of ultrafast laser and precise motion control technologies (for micromachining difficult-to-machine materials) to further the aggregate throughput and yield improvements over conventional machining methods. The project described in this report advanced these leading-edge technologies thru the development and verification of two platforms: a hybrid enhanced laser chassis and a multi-application testbed.

  15. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    International Nuclear Information System (INIS)

    2003-01-01

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9) planning

  16. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-09-12

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9

  17. TMI-2 reactor vessel head removal

    International Nuclear Information System (INIS)

    Bengel, P.R.; Smith, M.D.; Estabrook, G.A.

    1984-12-01

    This report describes the safe removal and storage of the Three Mile Island Unit 2 reactor vessel head. The head was removed in July 1984 to permit the removal of the plenum and the reactor core, which were damaged during the 1979 accident. From July 1982, plans and preparations were made using a standard head removal procedure modified by the necessary precautions and changes to account for conditions caused by the accident. After data acquisition, equipment and structure modifications, and training the head was safely removed and stored and the internals indexing fixture and a work platform were installed on top of the vessel. Dose rates during and after the operation were lower than expected; lessons were learned from the operation which will be applied to the continuing fuel removal operations activities

  18. TMI-2 reactor vessel head removal

    International Nuclear Information System (INIS)

    Bengel, P.R.; Smith, M.D.; Estabrook, G.A.

    1985-09-01

    This report describes the safe removal and storage of the Three Mile Island Unit 2 (TMI-2) reactor vessel head. The head was removed in July 1984 to permit the removal of the plenum and the reactor core, which were damaged during the 1979 accident. From July 1982, plans and preparations were made using a standard head removal procedure modified by the necessary precautions and changes to account for conditions caused by the accident. After data acquisition, equipment and structure modifications, and training, the head was safely removed and stored; and the internals indexing fixture and a work platform were installed on top of the vessel. Dose rates during and after the operation were lower than expected; lessons were learned from the operation which will be applied to the continuing fuel removal operations activities

  19. Nuclear Safety Project. Annual report 1986

    International Nuclear Information System (INIS)

    1987-09-01

    The annual report 1986 is a detailed description of work within the Nuclear Safety Project performed in 1986 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes individual research activities on dynamic loads and strains of reactor components under accident conditions, fuel behaviour under accident conditions, investigation and control of LWR core-meltdown accidents, improvement of fission product retention and reduction of radiation exposure, and on behaviour, impact and removal of released pollutants. (DG)

  20. Fairbanks Geothermal Energy Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Karl, Bernie [CHSR,LLC Owner

    2013-05-31

    The primary objective for the Fairbanks Geothermal Energy Project is to provide another source of base-load renewable energy in the Fairbanks North Star Borough (FNSB). To accomplish this, Chena Hot Springs Resort (Chena) drilled a re-injection well to 2700 feet and a production well to 2500 feet. The re-injection well allows a greater flow of water to directly replace the water removed from the warmest fractures in the geothermal reservoir. The new production will provide access to warmer temperature water in greater quantities.

  1. Development of HUMASORB trademark, a lignite derived humic acid for removal of metals and organic contaminants from groundwater

    International Nuclear Information System (INIS)

    Sanjay, H.G.; Srivastave, K.C.; Walia, D.S.

    1995-01-01

    Heavy metal and organic contamination of surface and groundwater systems is a major environmental concern. The contamination is primarily due to improperly disposed industrial wastes. The presence of toxic heavy metal ions, volatile organic compounds (VOCs) and pesticides in water is of great concern and could affect the safety of drinking water. Decontamination of surface and groundwater can be achieved using a broad spectrum of treatment options such as precipitation, ion-exchange, microbial digestion, membrane separation, activated carbon adsorption, etc. The state of the art technologies for treatment of contaminated water however, can in one pass remediate only one class of contaminants, i.e., either VOCs (activated carbon) or heavy metals (ion exchange). This would require the use of at a minimum, two different stepwise processes to remediate a site. The groundwater contamination at different Department of Energy (DOE) sites (e.g., Hanford) is due to the presence of both VOCs and heavy metals. The two-step approach increases the cost of remediation. To overcome the sequential treatment of contaminated streams to remove both organics and metals, a novel material having properties to remove both classes of contaminants in one step is being developed as part of this project.The objective of this project is to develop a lignite-derived adsorbent, Humasorb TM to remove heavy metals and organics from ground water and surface water streams

  2. Bisphenol A Removal by Submerged Macrophytes and the Contribution of Epiphytic Microorganisms to the Removal Process.

    Science.gov (United States)

    Zhang, Guosen; Wang, Yu; Jiang, Jinhui; Yang, Shao

    2017-06-01

    Bisphenol A (BPA), a typical endocrine disruptor, has been found in global aquatic environments, causing great concern. The capabilities of five common submerged macrophytes to remove BPA from water and the contributions of epiphytic microorganisms were investigated. Macrophytes removed 62%-100% of total BPA (5 mg/L) over 12 days; much higher rates than that observed in the control (2%, F = 261.511, p = 0.000). Ceratophyllum demersum was the most efficient species. C. demersum samples from lakes with different water qualities showed no significant differences in BPA removal rates. Moreover, removal, inhibition or re-colonization of epiphytic microorganisms did not significantly change the BPA removal rates of C. demersum. Therefore, the contributions of epiphytic microorganisms to the BPA removal process were negligible. The rate of BPA accumulation in C. demersum was 0.1%, indicating that BPA was mainly biodegraded by the macrophyte. Hence, submerged macrophytes, rather than epiphytic microorganisms, substantially contribute to the biodegradation of BPA in water.

  3. Technical bases for the use of CIF{sub 3} in the MSRE reactive gas removal project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Trowbridge, L.D.

    1997-06-01

    Nearly impermeable, non-volatile deposits in the Molten Salt Reactor Experiment (MSRE) off-gas piping are impeding the removal of reactive gases from that system. The deposits almost certainly consist of reduced uranium fluorides or of uranium oxyfluorides. Treatment with ClF{sub 3} is a non-intrusive method capable of chemically converting these compounds back to UF{sub 6}, which can then be removed as a gas. This report discusses the technical bases for the use of ClF{sub 3} treatments in this system. A variety of issues are examined, and where the necessary information exists or has been developed, the resolution discussed. The more important of these issues include the efficacy of ClF{sub 3} at deposit removal under the conditions imposed by the MSRE system, materials compatibility of ClF{sub 3} and its reaction products, and operational differences in the Reactive Gas Removal System imposed by the presence of ClF{sub 3} and its products.

  4. Electrofishing survey of the Great Miami River

    International Nuclear Information System (INIS)

    Stocker, L.E.; Miller, M.C.; Engman, J.; Evans, R.L.; Koch, R.W.; Brence, W.A.

    1994-01-01

    Fish sampling by electroshocking in the Great Miami River above and below the Fernald sit was designed to determine changes in the health of the fish community compared to the previous nine years and to collect samples for uranium analysis in fish filets. This document contains information describing the findings of this program. Topics discussed include: physical and chemical parameters, species richness, species diversity, and water analysis

  5. Spent nuclear fuel project product specification

    International Nuclear Information System (INIS)

    Pajunen, A.L.

    1998-01-01

    Product specifications are limits and controls established for each significant parameter that potentially affects safety and/or quality of the Spent Nuclear Fuel (SNF) packaged for transport to dry storage. The product specifications in this document cover the spent fuel packaged in MultiCanister Overpacks (MCOs) to be transported throughout the SNF Project. The SNF includes N Reactor fuel and single-pass reactor fuel. The FRS removes the SNF from the storage canisters, cleans it, and places it into baskets. The MCO loading system places the baskets into MCO/Cask assembly packages. These packages are then transferred to the Cold Vacuum Drying (CVD) Facility. After drying at the CVD Facility, the MCO cask packages are transferred to the Canister Storage Building (CSB), where the MCOs are removed from the casks, staged, inspected, sealed (by welding), and stored until a suitable permanent disposal option is implemented. The key criteria necessary to achieve these goals are documented in this specification

  6. Uranium removal from soils: An overview from the Uranium in Soils Integrated Demonstration program

    International Nuclear Information System (INIS)

    Francis, C.W.; Brainard, J.R.; York, D.A.; Chaiko, D.J.; Matthern, G.

    1994-01-01

    An integrated approach to remove uranium from uranium-contaminated soils is being conducted by four of the US Department of Energy national laboratories. In this approach, managed through the Uranium in Soils Integrated Demonstration program at the Fernald Environmental Management Project, Fernald, Ohio, these laboratories are developing processes that selectively remove uranium from soil without seriously degrading the soil's physicochemical characteristics or generating waste that is difficult to manage or dispose of. These processes include traditional uranium extractions that use carbonate as well as some nontraditional extraction techniques that use citric acid and complex organic chelating agents such as naturally occurring microbial siderophores. A bench-scale engineering design for heap leaching; a process that uses carbonate leaching media shows that >90% of the uranium can be removed from the Fernald soils. Other work involves amending soils with cultures of sulfur and ferrous oxidizing microbes or cultures of fungi whose role is to generate mycorrhiza that excrete strong complexers for uranium. Aqueous biphasic extraction, a physical separation technology, is also being evaluated because of its ability to segregate fine particulate, a fundamental requirement for soils containing high levels of silt and clay. Interactions among participating scientists have produced some significant progress not only in evaluating the feasibility of uranium removal but also in understanding some important technical aspects of the task

  7. A description of the nearshore fish communities in the Huron-Erie Corridor using multiple gear types

    Science.gov (United States)

    Francis, James T.; Chiotti, Justin A.; Boase, James C.; Thomas, Mike V.; Manny, Bruce A.; Roseman, Edward F.

    2013-01-01

    Great Lakes coastal wetlands provide a critical habitat for many fish species throughout their life cycles. Once home to one of the largest wetland complexes in the Great Lakes, coastal wetlands in the Huron–Erie Corridor (HEC) have decreased dramatically since the early 1900s. We characterized the nearshore fish communities at three different wetland complexes in the HEC using electrofishing, seines, and fyke nets. Species richness was highest in the Detroit River (63), followed by the St. Clair Delta (56), and Western Lake Erie (47). The nearshore fish communities in the Detroit River and St. Clair Delta consisted primarily of shiners, bluntnose minnow, centrarchids, and brook silverside, while the Western Lake Erie sites consisted of high proportions of non-native taxa including common carp, gizzard shad, goldfish, and white perch. Species richness estimates using individual-based rarefaction curves were higher when using electrofishing data compared to fyke nets or seine hauls at each wetland. Twelve fish species were captured exclusively during electrofishing assessments, while one species was captured exclusively in fyke nets, and none exclusively during seine hauls. Western Lake Erie wetlands were more indicative of degraded systems with lower species richness, lower proportion of turbidity intolerant species, and increased abundance of non-native taxa. This work highlights the importance of coastal wetlands in the HEC by capturing 69 different fish species utilizing these wetlands to fulfill life history requirements and provides insight when selecting gears to sample nearshore littoral areas.

  8. Response of larval sea lampreys (Petromyzon marinus) to pulsed DC electrical stimuli in laboratory experiments

    Science.gov (United States)

    Bowen, Anjanette K.; Weisser, John W.; Bergstedt, Roger A.; Famoye, Felix

    2003-01-01

    Four electrical factors that are used in pulsed DC electrofishing for larval sea lampreys (Petromyzon marinus) were evaluated in two laboratory studies to determine the optimal values to induce larval emergence over a range of water temperatures and conductivities. Burrowed larvae were exposed to combinations of pulsed DC electrical factors including five pulse frequencies, three pulse patterns, and two levels of duty cycle over a range of seven voltage gradients in two separate studies conducted at water temperatures of 10, 15, and 20°C and water conductivities of 25, 200, and 900 μS/cm. A four-way analysis of variance was used to determine significant (α = 0.05) influences of each electrical factor on larval emergence. Multiple comparison tests with Bonferroni adjustments were used to determine which values of each factor resulted in significantly higher emergence at each temperature and conductivity. Voltage gradient and pulse frequency significantly affected emergence according to the ANOVA model at each temperature and conductivity tested. Duty cycle and pulse pattern generally did not significantly influence the model. Findings suggest that a setting of 2.0 V/cm, 3 pulses/sec, 10% duty, and 2:2 pulse pattern seems the most promising in waters of medium conductivity and across a variety of temperatures. This information provides a basis for understanding larval response to pulsed DC electrofishing gear factors and identifies electrofisher settings that show promise to increase the efficiency of the gear during assessments for burrowed sea lamprey larvae.

  9. Tattoo removal with ingenol mebutate.

    Science.gov (United States)

    Cozzi, Sarah-Jane; Le, Thuy T; Ogbourne, Steven M; James, Cini; Suhrbier, Andreas

    2017-01-01

    An increasing number of people are getting tattoos; however, many regret the decision and seek their removal. Lasers are currently the most commonly used method for tattoo removal; however, treatment can be lengthy, costly, and sometimes ineffective, especially for certain colors. Ingenol mebutate is a licensed topical treatment for actinic keratoses. Here, we demonstrate that two applications of 0.1% ingenol mebutate can efficiently and consistently remove 2-week-old tattoos from SKH/hr hairless mice. Treatment was associated with relocation of tattoo microspheres from the dermis into the posttreatment eschar. The skin lesion resolved about 20 days after treatment initiation, with some cicatrix formation evident. The implications for using ingenol mebutate for tattoo removal in humans are discussed.

  10. Removal of root filling materials.

    LENUS (Irish Health Repository)

    Duncan, H.F. Chong, B.S.

    2011-05-01

    Safe, successful and effective removal of root filling materials is an integral component of non-surgical root canal re-treatment. Access to the root canal system must be achieved in order to negotiate to the canal terminus so that deficiencies in the original treatment can be rectified. Since a range of materials have been advocated for filling root canals, different techniques are required for their removal. The management of commonly encountered root filling materials during non-surgical re-treatment, including the clinical procedures necessary for removal and the associated risks, are reviewed. As gutta-percha is the most widely used and accepted root filling material, there is a greater emphasis on its removal in this review.

  11. UMTRA project water sampling and analysis plan, Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1994-04-01

    The Monument Valley Uranium Mill Tailings Remedial Action (UMTRA) Project site in Cane Valley is a former uranium mill that has undergone surface remediation in the form of tailings and contaminated materials removal. Contaminated materials from the Monument Valley (Arizona) UMTRA Project site have been transported to the Mexican Hat (Utah) UMTRA Project site for consolidation with the Mexican Hat tailings. Tailings removal was completed in February 1994. Three geologic units at the site contain water: the unconsolidated eolian and alluvial deposits (alluvial aquifer), the Shinarump Conglomerate (Shinarump Member), and the De Chelly Sandstone. Water quality analyses indicate the contaminant plume has migrated north of the site and is mainly in the alluvial aquifer. An upward hydraulic gradient in the De Chelly Sandstone provides some protection to that aquifer. This water sampling and analysis plan recommends sampling domestic wells, monitor wells, and surface water in April and September 1994. The purpose of sampling is to continue periodic monitoring for the surface program, evaluate changes to water quality for site characterization, and provide data for the baseline risk assessment. Samples taken in April will be representative of high ground water levels and samples taken in September will be representative of low ground water levels. Filtered and nonfiltered samples will be analyzed for plume indicator parameters and baseline risk assessment parameters

  12. Status report on the Experimental Boiling Water Reactor (EBWR) Decontamination and Decommissioning (D ampersand D) Project

    International Nuclear Information System (INIS)

    Sears, L.; Garlock, G.; Mencarelli, R.; Fellhauer, C.

    1994-01-01

    ALARON Corporation is under contract, to Argonne National Laboratory - East (ANL-E), to complete the decontamination and decommissioning of the Experimental Boiling Water Reactor (EBWR). The project, begun, in 1986 by ANL-E personnel, is projected to be completed by the end of 1994. The final phase of work was awarded to ALARON in December 1993 with the scope of work including the disassembly and removal of all remaining reactor internals, the reactor vessel, the lead bio-shield, the core liner, and the activated portion of the concrete bio-shield. This paper discusses the work undertaken beginning in January 1994 and continuing through July 1994. During this period the required pre-mobilization documentation was prepared and approved, mobilization was completed, and the reactor internals, reactor vessel, lead bio-shield and core liner were removed. The paper will compare the planned schedule to the actual schedule, discuss problems encountered, review volume reduction techniques and health and safety issues including radiological aspects of the project

  13. ALARA Review for the Sediment Relocation and Removal from the 105-N Fuel Storage Basin

    International Nuclear Information System (INIS)

    Demers, J.W.

    1998-01-01

    This as low as reasonable achievable (ALARA) review revision provides a description of the engineering and administrative controls used to manage personnel exposure, control contamination levels, and airborne radioactivity concentrations during sediment relocation and removal in the 105-N Fuel Storage Basin. This document updates and supercedes the ALARA review of the sediment-related activities contained in 100-N Basin Stabilization Project As Low As Reasonably Achievable Plan (BHI 1995)

  14. Ford Plug-In Project: Bringing PHEVs to Market Demonstration and Validation Project

    Energy Technology Data Exchange (ETDEWEB)

    D' Annunzio, Julie [Ford Motor Company, Dearborn, MI (United States); Slezak, Lee [U.S. DOE Office of Energy Efficiency & Renewable Energy, Washington, DC (United States); Conley, John Jason [National Energy Technology Lab. (NETL), Albany, OR (United States)

    2014-03-26

    This project is in support of our national goal to reduce our dependence on fossil fuels. By supporting efforts that contribute toward the successful mass production of plug-in hybrid electric vehicles, our nation’s transportation-related fuel consumption can be offset with energy from the grid. Over four and a half years ago, when this project was originally initiated, plug-in electric vehicles were not readily available in the mass marketplace. Through the creation of a 21 unit plug-in hybrid vehicle fleet, this program was designed to demonstrate the feasibility of the technology and to help build cross-industry familiarity with the technology and interface of this technology with the grid. Ford Escape PHEV Demonstration Fleet 3 March 26, 2014 Since then, however, plug-in vehicles have become increasingly more commonplace in the market. Ford, itself, now offers an all-electric vehicle and two plug-in hybrid vehicles in North America and has announced a third plug-in vehicle offering for Europe. Lessons learned from this project have helped in these production vehicle launches and are mentioned throughout this report. While the technology of plugging in a vehicle to charge a high voltage battery with energy from the grid is now in production, the ability for vehicle-to-grid or bi-directional energy flow was farther away than originally expected. Several technical, regulatory and potential safety issues prevented progressing the vehicle-to-grid energy flow (V2G) demonstration and, after a review with the DOE, V2G was removed from this demonstration project. Also proving challenging were communications between a plug-in vehicle and the grid or smart meter. While this project successfully demonstrated the vehicle to smart meter interface, cross-industry and regulatory work is still needed to define the vehicle-to-grid communication interface.

  15. Ultrasonic Abrasive Removal Of EDM Recast

    Science.gov (United States)

    Mandel, Johnny L.; Jacobson, Marlowe S.

    1990-01-01

    Ultrasonic abrasive process removes layer of recast material generated during electrical-discharge machining (EDM) of damper pocket on turbine blade. Form-fitted tool vibrated ultrasonically in damper pocket from which material removed. Vibrations activate abrasive in pocket. Amount of material removed controlled precisely.

  16. Removable bearing arrangement for a wind turbine generator

    Science.gov (United States)

    Bagepalli, Bharat Sampathkumaran; Jansen, Patrick Lee; Gadre, Aniruddha Dattatraya

    2010-06-15

    A wind generator having removable change-out bearings includes a rotor and a stator, locking bolts configured to lock the rotor and stator, a removable bearing sub-assembly having at least one shrunk-on bearing installed, and removable mounting bolts configured to engage the bearing sub-assembly and to allow the removable bearing sub-assembly to be removed when the removable mounting bolts are removed.

  17. High-efficiency SO2 removal in utility FGD systems

    International Nuclear Information System (INIS)

    Phillips, J.L.; Gray, S.; Dekraker, D.

    1995-01-01

    The U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI) have contracted with Radian Corporation to conduct full-scale testing, process modeling, and economic evaluations of six existing utility flue gas desulfurization (FGD) systems. The project objective is to evaluate low capital cost upgrades for achieving up to 98% sulfur dioxide (SO 2 ) removal efficiency in a variety of FGD system types. The systems include dual-loop, packed absorbers at Tampa Electric Company's Big Bend Station; cocurrent, packed absorbers at Hoosier Energy's Merom Station; dual-loop absorbers with perforated-plate trays at Southwestern Electric Power Company's Pirkey Station; horizontal spray absorbers at PSI Energy's Gibson Station; venturi scrubbers at Duquesne Light's Elrama Station; and open stray absorbers at New york State Electric and Gas Corporations's (NYSEG's) Kintigh Station. All operate in an inhibited-oxidation mode except the system at Big Bend (forced oxidation), and all use limestone reagent except the Elrama system (Mg-lime). The program was conducted to demonstrate that upgrades such as performance additives and/or mechanical modifications can increase system SO 2 removal at low cost. The cost effectiveness of each upgrade has been evaluated on the basis of test results and/or process model predictions for upgraded performance and utility-specific operating and maintenance costs. Results from this upgraded performance and utility-specific operating and maintenance costs. Results from this program may lead some utilities to use SO 2 removal upgrades as an approach for compliance with phase 2 of Title IV of the Clean Air Act Amendments (CAAA) of 1990. This paper summarizes the results of testing, modeling, and economic evaluations that have been completed since July, 1994

  18. Engineering report for interim solids removal modifications of the Steam Plant Wastewater Treatment Facility

    International Nuclear Information System (INIS)

    1995-04-01

    The Steam Plant Wastewater Treatment Facility (SPWTF) treats wastewater from the Y-12 Plant coal yard, steam plant, and water demineralizer facility. The facility is required to comply with National Pollutant Discharge Elimination System (NPDES) standards prior to discharge to East Fork Poplar Creek (EFPC). The existing facility was designed to meet Best Available Technology (BAT) standards and has been in operation since 1988. The SPWTF has had intermittent violations of the NPDES permit primarily due to difficulties in complying with the limit for total iron of 1.0 ppM. A FY-1997 Line Item project, SPWTF Upgrades, is planned to improve the capabilities of the SPWTF to eliminate non-compliances with the permit limits. The intent of the Interim Solids Removal Modification project is to improve the SPWTF effluent quality and to provide pilot treatment data to assist in the design and implementation of the SPWTF Upgrades Line Item Project

  19. Pilot demonstrations of arsenic removal technologies.

    Energy Technology Data Exchange (ETDEWEB)

    Siegal Malcolm D.

    2004-09-01

    The Arsenic Water Technology Partnership (AWTP) program is a multi-year program funded by a congressional appropriation through the Department of Energy to develop and test innovative technologies that have the potential to reduce the costs of arsenic removal from drinking water. The AWTP members include Sandia National Laboratories, the American Water Works Association (Awwa) Research Foundation and WERC (A Consortium for Environmental Education and Technology Development). The program is designed to move technologies from bench-scale tests to field demonstrations. The Awwa Research Foundation is managing bench-scale research programs; Sandia National Laboratories is conducting the pilot demonstration program and WERC will evaluate the economic feasibility of the technologies investigated and conduct technology transfer activities. The objective of the Sandia Arsenic Treatment Technology Demonstration project (SATTD) is the field demonstration testing of both commercial and innovative technologies. The scope for this work includes: (1) Identification of sites for pilot demonstrations; (2) Accelerated identification of candidate technologies through Vendor Forums, proof-of-principle laboratory and local pilot-scale studies, collaboration with the Awwa Research Foundation bench-scale research program and consultation with relevant advisory panels; and (3) Pilot testing multiple technologies at several sites throughout the country, gathering information on: (a) Performance, as measured by arsenic removal; (b) Costs, including capital and Operation and Maintenance (O&M) costs; (c) O&M requirements, including personnel requirements, and level of operator training; and (d) Waste residuals generation. The New Mexico Environment Department has identified over 90 public water systems that currently exceed the 10 {micro}g/L MCL for arsenic. The Sandia Arsenic Treatment Technology Demonstration project is currently operating pilots at three sites in New Mexico. The cities of

  20. Tattoo removal with ingenol mebutate

    Science.gov (United States)

    Cozzi, Sarah-Jane; Le, Thuy T; Ogbourne, Steven M; James, Cini; Suhrbier, Andreas

    2017-01-01

    An increasing number of people are getting tattoos; however, many regret the decision and seek their removal. Lasers are currently the most commonly used method for tattoo removal; however, treatment can be lengthy, costly, and sometimes ineffective, especially for certain colors. Ingenol mebutate is a licensed topical treatment for actinic keratoses. Here, we demonstrate that two applications of 0.1% ingenol mebutate can efficiently and consistently remove 2-week-old tattoos from SKH/hr hairless mice. Treatment was associated with relocation of tattoo microspheres from the dermis into the posttreatment eschar. The skin lesion resolved about 20 days after treatment initiation, with some cicatrix formation evident. The implications for using ingenol mebutate for tattoo removal in humans are discussed. PMID:28579816