  1. International Benchmarking of Electricity Transmission System Operators

    DEFF Research Database (Denmark)

    Agrell, Per J.; Bogetoft, Peter

    2014-01-01

    Electricity transmission system operators (TSO) in Europe are increasing subject to high-powered performance-based regulation, such as revenue-cap regimes. The determination of the parameters in such regimes is challenging for national regulatory authorities (NRA), since there is normally a single...... TSO operating in each jurisdiction. The solution for European regulators has been found in international regulatory benchmarking, organized in collaboration with the Council of European Energy Regulators (CEER) in 2008 and 2012 for 22 and 23 TSOs, respectively. The frontier study provides static cost...... weight restrictions and a correction method for opening balances....

  2. Commercial information system of Slovak Electricity Transmission System, Plc

    International Nuclear Information System (INIS)

    Laznicka, L.

    2004-01-01

    Commercial Information System (CIS), which main role of is to support the commercial activities of the company, is built up by business department of SEPS, Plc in close co-operation with the supplier company Sfera, Plc. The system entries are data from electricity meters obtained by automatized data acquisition and from bugging sheets, contractual hour diagrams, parameters of transmission system like measuring schemes and formulas for calculation of demand and supply, contractual data resulting from agreements, business conditions, URSO decisions and valid legislative. A part of the system is also support of process of data evaluation like calculation of transmitted energy quantity, calculation of actual output diagrams, comparison of actual and contractual diagrams, calculation of system divergence, calculation of demand divergence, etc. The final price for the drawings of services, which are joined with transmission of the electric power will be determined by the accounting process. In this causality there are automatically made out invoices for access, losses, system charges, system services, short-term and long-term transits, divergences and for cross-border transmission auctions. System also generates various specialized synopses and statistics for the evaluation requirements of important aspects and for parameter observations. Successive liberalisation of the electricity power market, changes in legislative and URSO decisions require CIS to be sufficiently configurable and to adapt flexible on the alternating environs. (author)

  3. Alternative electrical transmission systems and their environmental impact

    Energy Technology Data Exchange (ETDEWEB)

    Schiefelbein, G.F.

    1977-08-01

    A general description is provided of electrical transmission systems as an aid in determining their environmental impacts. Alternating current, direct current, overhead systems, underground systems, and water crossings are treated. The cost, performance, reliability, safety, and environmental impact of these systems are compared.

  4. Electrical transmission

    Energy Technology Data Exchange (ETDEWEB)

    Sayers, D P

    1960-05-01

    After briefly tracing the history of electricity transmission, trends in high voltage transmission and experiments being conducted on 650 kV are discussed. 5000 miles of the U.K. grid are operated at 132 kV and 1000 at 275 kV, ultimately to provide a super grid at 380 kV. Problems are insulation, radio interference and the cost of underground lines (16 times that of overhead lines). Also considered are the economics of the grid as a means of transporting energy and as a means of spreading the peak load over the power stations in the most efficient manner. Finally, the question of amenities is discussed.

  5. Creating a robust and integrated electrical transmission system

    International Nuclear Information System (INIS)

    McLain, S.

    2004-01-01

    The service territory for Puget Sound Energy (PSE) was presented in terms of electric power and gas transmission. Issues affecting the Puget Sound area include high growth and the west coast energy crisis which has had an adverse financial impact on the power industry. The transmission system is basically at capacity and has been impacted by imports and exports between the United States and Canada. Other issues include the separation between energy resources and transmission, modernizing the power grid, and challenges for independent power producers (IPPs). The Northwest Transmission Assessment Committee (NTAC), which was formed under the Northwest Power Pool, has the potential to bring interested parties to study constrained paths and to plan a single utility concept for the region. It is expected that new challenges such as financing and risk management will emerge once the technical solutions are identified and agreed upon. The issue of enforceable and mandatory reliability standards was also discussed. 1 fig

  6. Electric Power Transmission Lines

    Data.gov (United States)

    Department of Homeland Security — Transmission Lines are the system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power...

  7. Electric power transmission system: A new expansion scheme

    International Nuclear Information System (INIS)

    Unidad de Planeacion Minero Energetica, UPME

    2000-01-01

    With the purpose of responding to the interconnection requirements among the main cities of the country, a company of public character was created, in charge of the planning and of the development of the national interconnected system (NIS), in such form that their work optimized the use of the available energy resources for the electricity supply and it improved the accounting levels and quality of the service. Starting from 1967, interconnection electric Corp., ISA, a very important task began in the development of methodologies and strategies of expansion of the INS that it allowed, in very short term, to connect the areas of Bogota the Atlantic Cost, Antioquia and the Cauca Valley and to develop important generation projects for the supply of electric power of the country. Then, the electric sector was reformed through the laws 142 and 143 of 1994, in search of the specialization of the business and in that sense, ISA is divided in two companies: ISAGEN that the activities degeneration and electric power commercialization, and ISA, company electric power transport, that it takes charge of the interconnection of the national system assumes. In connection with the execution of the transmission works and in the face of the possibility of lingering courts of energy, the law establishes that ISA will carry out the works that are needed and that the particular initiative doesn't develop. For that same time, it is considered that the planning should be carried out in an integral way, taking into account the requirements of the population's energy and its possibilities of supply and through programs and actions of appropriate use of the available energy resources. The UPME (Unit of Planning Miner Energetic) was created for assumes this work, so with their analyses they already offer signs to the state the investors, about the population's necessities and of the business opportunities, respectively

  8. Electric transmission technology

    International Nuclear Information System (INIS)

    Shah, K.R.

    1990-01-01

    Electric transmission technology has matured and can transmit bulk power more reliably and economically than the technology 10 years ago.In 1882, Marcel Depres transmitted 15 kW electric power at 2 kV, using a constant direct current; present transmission voltages have risen to ± 600 kV direct current (DC) and 765 kV alternating current (AC), and it is now possible to transmit bulk electric power at voltages as high as ± 1000 kV DC and 1500 kV AC. Affordable computer systems are now available to optimize transmission reliably. New materials have reduced the bulk of insulation for lines and equipment. New conducting materials and configurations have reduced losses in transmission. Advances in line structures and conductor motion, understanding of flashover characteristics of insulators and air-gaps and electrical performance of lines have resulted in more compact urban transmission lines. (author). 15 refs., 7 tabs., 11 figs

  9. Carbon footprint of the Danish electricity transmission and distribution systems

    DEFF Research Database (Denmark)

    Turconi, Roberto; Astrup, Thomas Fruergaard

    . The purpose was to evaluate the potential importance of environmental impacts associated with T&D in current and future electricity systems. Including the emissions from electricity T&D is needed to provide a full carbon footprint of electricity systems, and is essential to properly assess the environmental...

  10. 2015 Plan. Project 5: transmission systems of electric power

    International Nuclear Information System (INIS)

    1992-12-01

    The planning aspects of transmission system expansion in Brazil are described, mentioning the evolution at long date of the transmission system, emphasizing the qualitative and strategic aspects. The engineering aspects and the technological development are also presented. (C.G.C.)

  11. Electrical Collection and Transmission Systems for Offshore Wind Power: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Green, J.; Bowen, A.; Fingersh, L.J.; Wan, Y.

    2007-03-01

    The electrical systems needed for offshore wind farms to collect power from wind turbines--and transmit it to shore--will be a significant cost element of these systems. This paper describes the development of a simplified model of the cost and performance of such systems.

  12. Transmission prices in the electric system. Technical constraints and economic efficiency

    International Nuclear Information System (INIS)

    Polidori, P.

    1999-01-01

    This article analyses the two main models at the core of today's theoretical discussion on transmission pricing in electricity sectors under competition. The first aim of the paper is showing how technical constraints that characterise transmission systems may affect energy production and transmission and therefore the definition of the price system for using the electric grid. The second aim of the paper is showing how it is possible to suggest solutions, although not free from limitations, that can be used for an efficient management of electric systems characterised by generation and consumption sectors under competition [it

  13. Issues affecting the electricity transmission system in Mexico under a competitive integrated model

    Energy Technology Data Exchange (ETDEWEB)

    Avila Rosales, M.A.; Gonzalez Flores, J. [Federal Electricity Commission, Mexico City (Mexico)

    2008-07-01

    The electricity sector in Mexico is undergoing a process of significant structural change. The traditional industry framework has been exposed to new market structures and greater competition, both of which are being introduced by changing regulations regarding who can generate, transmit, distribute and sell electricity. Mexico's power industry is changing to a competitive integrated model. Electricity industry restructuring is partly based on the assumption that transmission systems should be flexible, reliable, and open to all exchanges no matter where the suppliers and consumers of energy are located and who they are. However, neither the existing transmission systems nor its management infrastructure can fully support this open exchange. This paper described the primary issues affecting the transmission system in Mexico under a competitive environment and a transmission expansion planning approach that took the uncertainties associated with the location and size of new generating power stations into consideration in order to produce least-cost and robust transmission plans. The paper described the planning process, including a rigorous analysis of the economics of the resulting transmission plans. Specifically, the paper described the current regulatory framework and supply adequacy as well as current procedures and methodologies for transmission management and expansion planning. The transmission planning methodology was also presented. This included a minimum cost analysis; profit analysis; and least-cost transmission plan. It was concluded that the transmission expansion planning approach stressed that a horizon year viewpoint was important because transmission additions have long-term use. The transmission expansion planning approach, further defined the process of selecting transmission projects as one of comparing and optimizing attributes such as near-term needs; long-term utilization; contribution to overall reliability; and favorable or least

  14. ELECTRODYNAMICS OF TRANSMISSION AND LOSSES OF POWER IN THE DEVICES OF ELECTRIC TRACTION SYSTEMS

    Directory of Open Access Journals (Sweden)

    M. O. Kostin

    2014-01-01

    Full Text Available Purpose. Theoretical justification of the "field" approach (based on electromagnetic field to the transmission and losses of power in the devices of traction power supply systems and electric rolling stock. Methodology. The methods of electromagnetic field theory and, in particular, the theory and practice of electromagnetic energy transmission based on the concept of the Poynting vector and elements of the theory of propagation, reflection and refraction of plane electromagnetic waves were used. Findings. Theoretical studies of electromagnetic energy transmission from the traction substation to the electric rolling stock through dielectric (air surrounding traction network: between the contact wire and the rail were carried out. It is proposed strategic designing "squat" (low types of electric rolling stock. The components of electric energy flow through the roof of electric rolling stock and its frontal part of the body were estimated. This allows reliable etimating active power losses in electric traction system. To compensate the reactive power consumed by electric rolling stock, which is conditioned by standing waves, it is proposed (for extinction of the the last to develop and put in front of electric rolling stock the layer of particular environment with the necessary parameters. Originality. The "field" principle of the power transmission analysis and its losses arising in electric traction system was first proposed. The laws of motion of electromagnetic energy flows through the roof and the frontal part of the body of electric rolling stock were established. Practical value. An expression of the absolute value of the Poynting vector in the points of dielectric (air between the contact wire and the rail was obtained. This allows assessing the highest density of energy, which is transferred to the time unit and predicting the main dimensions of the unit of electric rolling stock. The energy indices of the roof of electric rolling stock

  15. Operational electricity transmission rates

    International Nuclear Information System (INIS)

    Roggen, M.

    1997-01-01

    In a liberalized electricity market both the consumers and the producers of electricity must pay for the use of the power transmission network. Thus, the net manager has unlimited options to realize efficiency improvements. A neutral and transparent management of the power grid is necessary to avoid disturbance of the market. KEMA Consulting translated abstract ideas and strategic advices to operational concepts in its report 'A framework for the determination of tariffs of the transport in the Dutch electricity sector'

  16. A 10 Gbit/s OCDMA system based on electric encoding and optical transmission

    Science.gov (United States)

    Li, Chuan-qi; Hu, Jin-lin; He, Dong-dong; Chen, Mei-juan; Wang, Da-chi; Chen, Yan

    2013-11-01

    An electric encoded/optical transmission system of code division multiple access (CDMA) is proposed. It encodes the user signal in electric domain, and transfers the different code slice signals via the different wavelengths of light. This electric domain encoder/decoder is compared with current traditional encoder/decoder. Four-user modulation/demodulation optical CDMA (OCDMA) system with rate of 2.5 Gbit/s is simulated, which is based on the optical orthogonal code (OCC) designed in our laboratory. The results show that the structure of electric encoding/optical transmission can encode/decode signal correctly, and can achieve the chip rate equal to the user data rate. It can overcome the rate limitation of electronic bottleneck, and bring some potential applications in the electro-optical OCDMA system.

  17. Multilayered Functional Insulation System (MFIS) for AC Power Transmission in High Voltage Hybrid Electrical Propulsion

    Science.gov (United States)

    Lizcano, Maricela

    2017-01-01

    High voltage hybrid electric propulsion systems are now pushing new technology development efforts for air transportation. A key challenge in hybrid electric aircraft is safe high voltage distribution and transmission of megawatts of power (>20 MW). For the past two years, a multidisciplinary materials research team at NASA Glenn Research Center has investigated the feasibility of distributing high voltage power on future hybrid electric aircraft. This presentation describes the team's approach to addressing this challenge, significant technical findings, and next steps in GRC's materials research effort for MW power distribution on aircraft.

  18. Calculation and application of energy transaction allocation factors in electric power transmission systems

    Science.gov (United States)

    Fradi, Aniss

    The ability to allocate the active power (MW) loading on transmission lines and transformers, is the basis of the "flow based" transmission allocation system developed by the North American Electric Reliability Council. In such a system, the active power flows must be allocated to each line or transformer in proportion to the active power being transmitted by each transaction imposed on the system. Currently, this is accomplished through the use of the linear Power Transfer Distribution Factors (PTDFs). Unfortunately, no linear allocation models exist for other energy transmission quantities, such as MW and MVAR losses, MVAR and MVA flows, etc. Early allocation schemes were developed to allocate MW losses due to transactions to branches in a transmission system, however they exhibited diminished accuracy, since most of them are based on linear power flow modeling of the transmission system. This thesis presents a new methodology to calculate Energy Transaction Allocation factors (ETA factors, or eta factors), using the well-known process of integration of a first derivative function, as well as consistent and well-established mathematical and AC power flow models. The factors give a highly accurate allocation of any non-linear system quantity to transactions placed on the transmission system. The thesis also extends the new ETA factors calculation procedure to restructure a new economic dispatch scheme where multiple sets of generators are economically dispatched to meet their corresponding load and their share of the losses.

  19. Learning from the blackouts. Transmission system security in competitive electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    none

    2005-07-01

    Electricity market reform has fundamentally changed the environment for maintaining reliable and secure power supplies. Growing inter-regional trade has placed new demands on transmission systems, creating a more integrated and dynamic network environment with new real-time challenges for reliable and secure transmission system operation. Despite these fundamental changes, system operating rules and practices remain largely unchanged. The major blackouts of 2003 and 2004 raised searching questions about the appropriateness of these arrangements. Management of system security needs to be transformed to maintain reliable electricity services in this more dynamic operating environment. These challenges raise fundamental issues for policymakers. This publication presents case studies drawn from recent large-scale blackouts in Europe, North America, and Australia. It concludes that a comprehensive, integrated policy response is required to avoid preventable large-scale blackouts in the future.

  20. Optimal Planning of the Nordic Transmission System with 100% Electric Vehicle Penetration of passenger cars by 2050

    DEFF Research Database (Denmark)

    Graabak, Ingeborg; Wu, Qiuwei; Warland, Leif

    2016-01-01

    This paper presents the optimal planning of the Nordic backbone transmission system with 100% electric vehicle penetration of passenger cars by 2050. Electric vehicles will play an important role in the future energy systems and can reduce the greenhouse gas emission from the transport sector....... However, the electric vehicles will increase the electricity consumption and might induce congestions in the transmission systems. In order to deal with the electricity consumption increase from the electric vehicle integration into the power system and maximize the social welfare, the optimal investments...... of the Nordic transmission system are studied. Case studies were conducted using the market simulation model EMPS and two electric vehicle charging scenarios: a spot price based scenario and a dumb charging scenario. The electric vehicle charging power is assumed to be 3.68 kW with 1 phase 16A. The complete...

  1. Study on Two-segment Electric-mechanical Composite Braking Strategy of Tracked Vehicle Hybrid Transmission System

    OpenAIRE

    Ma, Tian; Gai, Jiangtao; Ma, Xiaofeng

    2010-01-01

    In order to lighten abrasion of braking system of hybrid electric tracked vehicle, according to characteristic of hybrid electric transmission, electric-mechanical composite braking method was proposed. By means of analyzing performance of electric braking and mechanical braking and three-segment composite braking strategy, two-segment electric-mechanical composite braking strategy was put forward in this paper. Simulation results of Matlab/Simulink indicated that the two-segment electric-mec...

  2. Fault and load flows analysis of electricity transmission and distribution system in Casanare (Colombia)

    OpenAIRE

    Castro-Galeano, Juan Carlos; Cabra-Sarmiento, Wilson Javier; Ortiz-Portilla, Jhony Fernando

    2017-01-01

    Abstract This article describes a simulation of the electrical local distribution and regional transmission system of Enerca S.A. E.S.P. at 34.5 kV and 115 kV, identifying the most critical circuits and substations. The company is located in one of the major petroleum production areas in Colombia, and because of a massive growth in this sector, the electrical company expanded its networks in a radial way. This expansion was improvised and poorly planned due to the accelerated need to meet the...

  3. Optimal planning of the Nordic transmission system with 100% electric vehicle penetration of passenger cars by 2050

    International Nuclear Information System (INIS)

    Graabak, Ingeborg; Wu, Qiuwei; Warland, Leif; Liu, Zhaoxi

    2016-01-01

    This paper presents the optimal planning of the Nordic backbone transmission system with 100% electric vehicle penetration of passenger cars by 2050. Electric vehicles will play an important role in the future energy systems and can reduce the greenhouse gas emission from the transport sector. However, the electric vehicles will increase the electricity consumption and might induce congestions in the transmission systems. In order to deal with the electricity consumption increase from the electric vehicle integration into the power system and maximize the social welfare, the optimal investments of the Nordic transmission system are studied. Case studies were conducted using the market simulation model EMPS (Efi's multi-area power market simulator) and two electric vehicle charging scenarios: a spot price based scenario and a dumb charging scenario. The electric vehicle charging power is assumed to be 3.68 kW with 1 phase 16 A. The complete electrification of the private passenger fleet increases the yearly power demand in the Nordic region with ca 7.5%. The profitable increases in transmission capacities are highest for dumb charging, but are very low for both dumb and spot price based charging compared to a Reference case. - Highlights: • The electric vehicle distribution is done using population and car statistics. • The 100% penetration electric vehicle demand is obtained for Nordic countries. • The optimal investments in the Nordic transmission system with electric vehicles are studied.

  4. Hardware-in-loop simulation of electric vehicles automated mechanical transmission system

    Energy Technology Data Exchange (ETDEWEB)

    Liao, C.; Wu, Y.; Wang, L. [Chinese Academy of Sciences, Beijing (China). Inst. of Electrical Engineering

    2009-03-11

    Automated mechanical transmission (AMT) can be used to enhance the performance of hybrid electric vehicles. In this study, hardware-in-loop (HIL) simulations were used to develop an AMT control system. HIL was used to simulate the running and fault status of the system as well as to optimize its performance. HIL was combined with a commercial simulation tool and an automatic code generation technology in a real time environment tool to develop the AMT control system. A hybrid vehicle system dynamics model was generated and then simulated in various real time operating vehicle environments. Virtual instrument technology was used to develop real time monitoring, parameter matching calibration, data acquisition and offline analyses for the optimization of the control system. Results of the analyses demonstrated that the AMT control system can be used to optimize the performance of hybrid electric vehicles. 5 refs., 9 figs.

  5. Development of BLDC Electric Motor Control System In Hydraulic Servo Drive Based on Variable Hydrostatic Transmission

    Directory of Open Access Journals (Sweden)

    O. I. Tarasov

    2014-01-01

    Full Text Available Modern robotic systems require the use of servo drives. Owing to encoder and negative feedback these drives ensure highly accurate motion parameters. In case of autonomous systems drives must also have high power characteristics. Moreover, in most cases, it was impossible to select the motor so that the speed and torque on its shaft were in compliance with those of required by the actuator. To match these parameters different types of reducers are used. The article justifies and considers a selection criterion of the gear ratios for such transmission. For clarity, there is an example of selecting a motor and a gear for above transmission, taking into account the proposed criterion. In addition, the article discusses the advantages of using hydrostatic transmission in the drive, which monitors the angular position of the output level, in comparison with a mechanical gearbox. Due to the fact that, at the moment, BLDC motors have the best power characteristics, such a servo drive requires a special control system that will take into account the features of variable hydrostatic transmission and electric BLDC motor. Therefore, the paper proposes a structure of such a system and set out the principles of its construction. Various embodiments of sensor types that may be used in this system and their installation scheme explained.

  6. Design optimization of the transmission system for electric vehicles considering the dynamic efficiency of the regenerative brake

    NARCIS (Netherlands)

    Zhao, Bolin; Lv, Chen; Hofman, Theo; Steinbuch, Maarten; Zhang, Junzhi; Cao, Dongpu

    2018-01-01

    In this paper, gear ratios of a two-speed transmission system are optimized for an electric passenger car. Quasi static system models, including the vehicle model, the motor, the battery, the transmission system, and drive cycles are established in MATLAB/Simulink at first. Specifically, since the

  7. Transmission and distribution electrical engineering

    CERN Document Server

    Bayliss, Colin

    2003-01-01

    This comprehensive treatment of the theory and practice encountered in the installation and design of transmission and distribution systems for electrical power has been updated and revised to provide the project engineer with all the latest, relevant information to design and specify the correct system for a particular application.Thoroughly updated and revised to include latest developmentsLearn from and Author with extensive experience in managing international projectsFind out the reasoning and implicatons behind the different specifications and methods

  8. Cloud-based shaft torque estimation for electric vehicle equipped with integrated motor-transmission system

    Science.gov (United States)

    Zhu, Xiaoyuan; Zhang, Hui; Yang, Bo; Zhang, Guichen

    2018-01-01

    In order to improve oscillation damping control performance as well as gear shift quality of electric vehicle equipped with integrated motor-transmission system, a cloud-based shaft torque estimation scheme is proposed in this paper by using measurable motor and wheel speed signals transmitted by wireless network. It can help reduce computational burden of onboard controllers and also relief network bandwidth requirement of individual vehicle. Considering possible delays during signal wireless transmission, delay-dependent full-order observer design is proposed to estimate the shaft torque in cloud server. With these random delays modeled by using homogenous Markov chain, robust H∞ performance is adopted to minimize the effect of wireless network-induced delays, signal measurement noise as well as system modeling uncertainties on shaft torque estimation error. Observer parameters are derived by solving linear matrix inequalities, and simulation results using acceleration test and tip-in, tip-out test demonstrate the effectiveness of proposed shaft torque observer design.

  9. Evaluate electric field strengths in the vicinity of electric transmission systems of electric power; Avaliar intensidades de campo eletrico nas vizinhancas de sistemas de transmissao de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Rodrigues, J.F.; Ulson, J.A.C.; Creppe, R.C.; Serni, P.J.A. [Universidade Estadual Paulista Julio de Mesquita Filho (FEB/UNESP), Bauru, SP (Brazil). Fac. de Engenharia. Dept. de Engenharia Eletrica], Emails: jfranc@feb.unesp.br, ulson@feb.unesp.br, creppe@feb.unesp.br, paulojas@feb.unesp.br

    2009-07-01

    The main purpose in this paper is to describe a methodology for the calculation of the profile of the electric field in the level soil and proximities originated by electric energy transmission systems real and in operation in the country. It is also commented the equation used and your computational implementation in order to agile and to optimize the studies. The results of simulations were just presented for the transmission system in the voltage class 500 kV for to simplify the understanding and space restriction in the article, although five others types of configurations have also been used in the complete study with very voltages and respective classes. The results were animating and very nearby of values well-known of electric field of other and publications traditional in the area. The graphic exits of software for better visual comprehension and understanding went in accomplished in the plan (2D) and in the space (3D). (author)

  10. Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, M.; Ela, E.; Hein, J.; Schneider, T.; Brinkman, G.; Denholm, P.

    2012-06-01

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).

  11. Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems. Operations and Transmission Planning

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ela, Erik [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hein, Jeff [National Renewable Energy Lab. (NREL), Golden, CO (United States); Schneider, Thomas [National Renewable Energy Lab. (NREL), Golden, CO (United States); Brinkman, Gregory [National Renewable Energy Lab. (NREL), Golden, CO (United States); Denholm, Paul [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2012-06-15

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%–90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT). Learn more at the RE Futures website. http://www.nrel.gov/analysis/re_futures/

  12. Power transmission cable development for the Space Station Freedom electrical power system

    Science.gov (United States)

    Schmitz, Gregory V.; Biess, John J.

    1989-01-01

    Power transmission cable is presently being evaluated under a NASA Lewis Research Center advanced development contract for application in the Space Station Freedom (SSF) electrical power system (EPS). Evaluation testing has been performed by TRW and NASA Lewis Research Center. The results of this development contract are presented. The primary cable design goals are to provide (1) a low characteristic inductance to minimize line voltage drop at 20 kHz, (2) electromagnetic compatibility control of the 20-kHz ac power current, (3) a physical configuration that minimizes ac resistance and (4) release of trapped air for corona-free operation.

  13. Fault detection and classification in electrical power transmission system using artificial neural network.

    Science.gov (United States)

    Jamil, Majid; Sharma, Sanjeev Kumar; Singh, Rajveer

    2015-01-01

    This paper focuses on the detection and classification of the faults on electrical power transmission line using artificial neural networks. The three phase currents and voltages of one end are taken as inputs in the proposed scheme. The feed forward neural network along with back propagation algorithm has been employed for detection and classification of the fault for analysis of each of the three phases involved in the process. A detailed analysis with varying number of hidden layers has been performed to validate the choice of the neural network. The simulation results concluded that the present method based on the neural network is efficient in detecting and classifying the faults on transmission lines with satisfactory performances. The different faults are simulated with different parameters to check the versatility of the method. The proposed method can be extended to the Distribution network of the Power System. The various simulations and analysis of signals is done in the MATLAB(®) environment.

  14. The insertion of environmental impact assessment in the planning process of electrical energy transmission systems

    International Nuclear Information System (INIS)

    Pires, S.H.

    1994-03-01

    The main objective of this work is to identify and propose adequate methodologies in each stage of the planning process of electrical energy transmission systems. The aim is to incorporate the environmental dimension as a variable of this process, along with the economic and technical aspects. All these factors are to be taken into consideration in the decision-making, design and management of these projects. The environmental impact assessment (EIA) concepts, methods and procedures were analysed, as well as the roles that it should play, as a means to become the effective instrument of the Environmental Policy. In this study we analysed the whole planning process of the implementation of transmission lines and their impact on the environment. The current attitudes about this subject were investigated and scrutinized. Critical evaluations were made to suggest an orientation in the formulation of the proposed methodology. (author). 125 refs, 11 figs, 13 tabs

  15. Transmission topologies for the integration of renewable power into the electricity systems of North Africa

    International Nuclear Information System (INIS)

    Brand, Bernhard

    2013-01-01

    A cost-minimizing electricity market model was used to explore optimized infrastructures for the integration of renewable energies in interconnected North African power systems until 2030. The results show that the five countries Morocco, Algeria, Tunisia, Libya and Egypt could together achieve significant economic benefits, reaching up to €3.4 billion, if they increase power system integration, build interconnectors and cooperate on joint utilization of their generation assets. Net electricity exports out of North Africa to Europe or Eastern Mediterranean regions, however, were not observed in the regime of integrated electricity markets until 2030, and could only be realized by much higher levels of renewable energy penetration than currently foreseen by North African governments. - Highlights: • Market model to optimize North Africa's generation and transmission infrastructures until 2030. • Simulations consider existing interconnectors, power plant inventories, as well as national renewable goals. • Savings of up to €3.4 billion can be realized by more cooperation and integrated system planning. • No electricity exports to Europe in a competitive market framework, except for very high renewable penetrations

  16. A literature survey on asset management in electrical power [transmission and distribution] system

    OpenAIRE

    Khuntia, S.R.; Rueda Torres, José L.; Bouwman, S.; van der Meijden, M.A.M.M.

    2016-01-01

    Asset management is one of the key components in a transforming electric power industry. Electric power industry is undergoing significant changes because of technical, socio-economical and environmental developments. Also, because of restructuring and deregulation, the focus has been on transmission and distribution assets that include transmission lines, power transformers, protection devices, substation equipment and support structures. This study aims to provide a detailed exposure to ass...

  17. 2015 Plan. Project 7: the environmental issue and the electrical sector. Transmission systems

    International Nuclear Information System (INIS)

    1992-10-01

    The main impacts in socio-environmental analysis of transmission lines and substations for expansion of the Brazilian electrical sector are described, showing the actions of social compensation aiming a better insertion of the transmission lines and the substations. The issues relating with the natural and native reserves, the supply to the large consumer centers and the socio-environmental licensing of transmission enterprises are also discussed. (C.G.C.)

  18. Transmission market support system

    International Nuclear Information System (INIS)

    Reinschmidt, K.F.; Coles, B.C.

    1995-01-01

    An interactive, computer-based market support system has been developed for transmission access that is efficient, equitable, and fair to all parties concerned with electrical transmission: utilities, electric generators, owners of transmission networks, and wholesale purchasers of electrical power. Each participant transmits electronically to the computer system his proposed price schedule for buying, selling, or transmitting power for each future time period. The price for transmission on a single line in one direction can differ from the price in the other direction. The total quantity offered in the transmission bid represents the capacity of the line, and the flow on the line cannot exceed this value. The system automatically computes the prices that clear the market; that is, the price that each generator receives at each bus, the price that each transmission operator receives on each line, and the price that each customer pays at each bus. The computer system maximizes the benefits to all three classes while satisfying the electrical characteristics of the transmission system by means of load flow calculations. Customers never pay more than their bid prices (but may pay less), and generators and transmission operators never receive less than their bid prices (but may receive more). The price at each bus applies to all buyers and sellers at that bus: all buyers at the same bus pay the same price and all generators at a bus receive the same price

  19. Kansas Electric Transmission Lines

    Data.gov (United States)

    Kansas Data Access and Support Center — This data set is a digital representation of the EletcircTransmission lines for the State of Kansas as maintained by the Kansas Corporation Commission. Data is...

  20. Prices on electricity and transmission of electricity

    International Nuclear Information System (INIS)

    2003-01-01

    This publication contains data on prices of electric energy and transmission of electricity valid from 1 January 2003. The purpose is to illustrate the price changes on the electricity market in terms of prices for different customer categories. All companies holding network concessions for areas and all companies trading in electricity are included in this report, which is produced on an annual basis.The prices for transmission services 1 January 2003 were on the whole unchanged compared to the preceding year. For households the mean annual cost was SEK 882 for flats, SEK 4 335 for one- or two-family houses with electric heating and SEK 1 925 for those without electric heating. Electricity prices rose considerably on 1 January 2003 compared to the year before. The mean price per kWh for households with standard agreements was SEK 0.519 for deliveries to flats, SEK 0.447 for one- or two-family houses with electric heating and SEK 0.471 without electric heating. As a result, the mean annual cost increased by SEK 326 for flats, SEK 3 012 for one- or two-family houses with electric heating, and by SEK 774 for those houses without electric heating. The high costs of electricity may be explained in part by the development on the Nordic Power Exchange (Nord Pool), where the spot price increased by about 290 per cent during 2002 (1 USD is about 8 SEK)

  1. Opportunities for Efficiency Improvements in the U.S. Electricity Transmission and Distribution System

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, Roderick K. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Onar, Omer C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kirkham, Harold [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fisher, Emily [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Burkes, Klaehn [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Starke, Michael R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Mohammed, Olama [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Weeks, George [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-04-01

    Since 2000, more than 172 quads of electricity have been transmitted on the US transmission and distribution (T&D) grid. Given this significant amount of energy flow, establishing and maintaining an efficient T&D grid is paramount. As shown in the figure below, the total percentage of overall losses in the US electric grid is approximately 6% (5.12% in 2012) (30% lower than the world average since 2000). While these efficiency losses appear to be relatively small from a percentage perspective, the total estimated electricity loss during this time is 10.8 quads.

  2. Wildlife and electric power transmission

    Science.gov (United States)

    Ellis, D.H.; Goodwin, J.G.; Hunt, J.R.; Fletcher, John L.; Busnel, R.G.

    1978-01-01

    Hundreds of thousands of miles of transmission lines have been introduced into our natural environment. These lines and their corridors can be damaging or beneficial to wildlife communities depending on how they are designed, where they are placed, and when they are constructed and maintained. With the current trend toward UHV systems, new problems (associated with additional increments in audible noise, electric and magnetic force fields, etc.) must be addressed. We recommend the following areas for careful study: (1) the response of wilderness species to transmission lines and line construction and maintenance activities (2) the magnitude of bird collision and electrocution mortality, (3) the response of power corridor and power tower in habiting wildlife to laboratory and field doses of electro-chemical oxidants, corona noise, electric and magnetic fields, etc., (4) the productivity of tower inhabiting birds compared with nearby non-tower nesters, and (5) the influence of powerline corridors on mammalian and avian migration patterns. It is our hope that the questions identified in this study will help stimulate further research so that we can maximize wildlife benefits and minimize wildlife detriments.

  3. Interface Control Document for the EMPACT Module that Estimates Electric Power Transmission System Response to EMP-Caused Damage

    Energy Technology Data Exchange (ETDEWEB)

    Werley, Kenneth Alan [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Mccown, Andrew William [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)ory

    2016-06-26

    The EPREP code is designed to evaluate the effects of an Electro-Magnetic Pulse (EMP) on the electric power transmission system. The EPREP code embodies an umbrella framework that allows a user to set up analysis conditions and to examine analysis results. The code links to three major physics/engineering modules. The first module describes the EM wave in space and time. The second module evaluates the damage caused by the wave on specific electric power (EP) transmission system components. The third module evaluates the consequence of the damaged network on its (reduced) ability to provide electric power to meet demand. This third module is the focus of the present paper. The EMPACT code serves as the third module. The EMPACT name denotes EMP effects on Alternating Current Transmission systems. The EMPACT algorithms compute electric power transmission network flow solutions under severely damaged network conditions. Initial solutions are often characterized by unacceptible network conditions including line overloads and bad voltages. The EMPACT code contains algorithms to adjust optimally network parameters to eliminate network problems while minimizing outages. System adjustments include automatically adjusting control equipment (generator V control, variable transformers, and variable shunts), as well as non-automatic control of generator power settings and minimal load shedding. The goal is to evaluate the minimal loss of customer load under equilibrium (steady-state) conditions during peak demand.

  4. Electric utility transmission and distribution upgrade deferral benefits from modular electricity storage : a study for the DOE Energy Storage Systems Program.

    Energy Technology Data Exchange (ETDEWEB)

    Eyer, James M. (Distributed Utility Associates, Inc., Livermore, CA)

    2009-06-01

    The work documented in this report was undertaken as part of an ongoing investigation of innovative and potentially attractive value propositions for electricity storage by the United States Department of Energy (DOE) and Sandia National Laboratories (SNL) Electricity Storage Systems (ESS) Program. This study characterizes one especially attractive value proposition for modular electricity storage (MES): electric utility transmission and distribution (T&D) upgrade deferral. The T&D deferral benefit is characterized in detail. Also presented is a generalized framework for estimating the benefit. Other important and complementary (to T&D deferral) elements of possible value propositions involving MES are also characterized.

  5. Topics on Electricity Transmission Pricing

    Energy Technology Data Exchange (ETDEWEB)

    Bjoerndal, Mette

    2000-02-01

    Within the last decade we have experienced deregulation of several industries, such as airlines, telecommunications and the electric utility industry, the last-mentioned being the focus of this work. Both the telecommunications and the electricity sector depend on network facilities, some of which are still considered as natural monopolies. In these industries, open network access is regarded as crucial in order to achieve the gains from increased competition, and transmission tariffs are important in implementing this. Based on the Energy Act that was introduced in 1991, Norway was among the first countries to restructure its electricity sector. On the supply side there are a large number of competing firms, almost exclusively hydro plants, with a combined capacity of about 23000 MW, producing 105-125 TWh per year, depending on the availability of water. Hydro plants are characterized by low variable costs of operation, however since water may be stored in dams, water has an opportunity cost, generally known as the water value, which is the shadow price of water when solving the generator's inter temporal profit maximization problem. Water values are the main factor of the producers' short run marginal cost. Total consumption amounts to 112-117 TWh a year, and consumers, even households, may choose their electricity supplier independent of the local distributor to which the customer is connected. In fact, approximately 10% of the households have actually changed supplier. The web-site www.konkurransetilsynet.no indicates available contracts, and www.dinside.no provides an ''energy-calculator'' where one can check whether it is profitable to switch supplier. If a customer buys energy from a remote supplier, the local distributor only provides transportation facilities for the energy and is compensated accordingly. Transmission and distribution have remained monopolized and regulated by the Norwegian Water Resources and Energy

  6. Topics in Electricity Transmission Pricing

    Energy Technology Data Exchange (ETDEWEB)

    Bjoerndal, Mette

    2000-02-01

    Within the last decade we have experienced deregulation of several industries, such as airlines, telecommunications and the electric utility industry, the last-mentioned being the focus of this work. Both the telecommunications and the electricity sector depend on network facilities, some of which are still considered as natural monopolies. In these industries, open network access is regarded as crucial in order to achieve the gains from increased competition, and transmission tariffs are important in implementing this. Based on the Energy Act that was introduced in 1991, Norway was among the first countries to restructure its electricity sector. On the supply side there are a large number of competing firms, almost exclusively hydro plants, with a combined capacity of about 23000 MW, producing 105-125 TWh per year, depending on the availability of water. Hydro plants are characterized by low variable costs of operation, however since water may be stored in dams, water has an opportunity cost, generally known as the water value, which is the shadow price of water when solving the generator's inter temporal profit maximization problem. Water values are the main factor of the producers' short run marginal cost. Total consumption amounts to 112-117 TWh a year, and consumers, even households, may choose their electricity supplier independent of the local distributor to which the customer is connected. In fact, approximately 10% of the households have actually changed supplier. The web-site www.konkurransetilsynet.no indicates available contracts, and www.dinside.no provides an ''energy-calculator'' where one can check whether it is profitable to switch supplier. If a customer buys energy from a remote supplier, the local distributor only provides transportation facilities for the energy and is compensated accordingly. Transmission and distribution have remained monopolized and regulated by the Norwegian Water Resources and Energy

  7. Topics on Electricity Transmission Pricing

    International Nuclear Information System (INIS)

    Bjoerndal, Mette

    2000-02-01

    Within the last decade we have experienced deregulation of several industries, such as airlines, telecommunications and the electric utility industry, the last-mentioned being the focus of this work. Both the telecommunications and the electricity sector depend on network facilities, some of which are still considered as natural monopolies. In these industries, open network access is regarded as crucial in order to achieve the gains from increased competition, and transmission tariffs are important in implementing this. Based on the Energy Act that was introduced in 1991, Norway was among the first countries to restructure its electricity sector. On the supply side there are a large number of competing firms, almost exclusively hydro plants, with a combined capacity of about 23000 MW, producing 105-125 TWh per year, depending on the availability of water. Hydro plants are characterized by low variable costs of operation, however since water may be stored in dams, water has an opportunity cost, generally known as the water value, which is the shadow price of water when solving the generator's inter temporal profit maximization problem. Water values are the main factor of the producers' short run marginal cost. Total consumption amounts to 112-117 TWh a year, and consumers, even households, may choose their electricity supplier independent of the local distributor to which the customer is connected. In fact, approximately 10% of the households have actually changed supplier. The web-site www.konkurransetilsynet.no indicates available contracts, and www.dinside.no provides an ''energy-calculator'' where one can check whether it is profitable to switch supplier. If a customer buys energy from a remote supplier, the local distributor only provides transportation facilities for the energy and is compensated accordingly. Transmission and distribution have remained monopolized and regulated by the Norwegian Water Resources and Energy Directorate (NVE). To prevent cross

  8. Prices on electricity and transmission of electricity

    International Nuclear Information System (INIS)

    2002-01-01

    This publication contains data on prices of electric energy and transmission of electricity valid on 1 January 2002. The purpose is to illustrate the price changes on the electricity market in terms of prices for different customer categories. All companies holding network concessions for areas and all companies trading in electricity are included in this report, which is produced on an annual basis. The prices for transmission services 1 January 2002 were on the whole unchanged compared to the preceding year. For households the mean annual cost was SEK 856 for flats, SEK 4,194 one- or two-family houses with electric heating and SEK 1,881 without electric heating. (1 SEK ∼ 0.1 USD). Electricity prices rose considerably on 1 January 2002 compared to the year before. The mean price per kWh for households according to standard agreement was SEK 0.356 for deliveries to flats, SEK 0.296 for apartments in one- or two-family houses with electric heating and SEK 0.316 without electric heating. That means that the mean annual cost increased by SEK 171 for flats. For one- or two-family houses with electric heating, costs increased by SEK 1,424, and by SEK 379 for those houses without electric heating. The high costs of electricity may be explained in part by the development on the Nordic Power Exchange (Nord Pool), where the spot price increased by 75 per cent during 2001. The price development for household customers during 1996-2002 is shown in a diagram

  9. Economy of electric power transmission

    International Nuclear Information System (INIS)

    Manzoni, G.; Delfanti, M.

    2008-01-01

    An analysis is presented of the impact of H V and Ehv transmission costs on the final value of the kWh supplied, with reference both to transmission systems of the European type and to long distance point-to-point transmission links. The analysis is extended to A C transmission by underground cables and to Hvdc submarine and aerial links. In the European power system, the impact of transmission costs results to be usually modest, but it may become important in the case of network congestions [it

  10. Analyzing the topological, electrical and reliability characteristics of a power transmission system for identifying its critical elements

    International Nuclear Information System (INIS)

    Zio, E.; Golea, L.R.

    2012-01-01

    The subject of this paper is the analysis of an electrical transmission system with the objective of identifying its most critical elements with respect to failures and attacks. The methodological approach undertaken is based on graph-theoretical (topological) network analysis. Four different perspectives of analysis are considered within the formalism of weighed networks, adding to the purely topological analysis of the system, the reliability and electrical characteristics of its components. In each phase of the analysis: i) a graph-theoretical representation is offered to highlight the structure of the most important system connections according to the particular characteristics examined (topological, reliability, electrical or electrical-reliability), ii) the classical degree index of a network node is extended to account for the different characteristics considered. The application of these concepts of analysis to an electrical transmission system of literature confirms the importance of different perspectives of analysis on such a critical infrastructure. - Highlights: ► We analyze a power system from topological, reliability and electrical perspectives. ► We rank critical components within a vulnerability assessment framework. ► We compute an extended degree to rank critical energy paths. ► We compare several analytical approaches and provide a table for choosing among them. ► We suggest network changes to increase the reliability of highly loaded energy paths.

  11. Design and Implementation of an over Current Protection Laboratory for Electrical Power Transmission Systems Based on PLC Techniques

    Directory of Open Access Journals (Sweden)

    Hassaan Th. H. Thabet

    2018-01-01

    Full Text Available This paper describes a modern approach for the protection of transmission lines to ensure theirsafety against the faults occurred in power systems. Our approach uses a Programmable LogicController (PLC to realize a transmission line as an over current protection relay. A conditioningcircuit was designed, implemented and tested to collect data obtained from Hall Effect sensors which convert them to suitable analog values compatible with PLC's inputs. Results obtained by our PLC control system are very similar to those obtained by the conventional relays but more efficient. An Automatic Reclosing System (ARS for remote faults is also included in this approach. Our PLC control system and its algorithm are illustrated in this paper also. This approach is designed to be used in electrical networks laboratories as an educational unit in electrical departments of engineering collages and technical institutes; it can be used also in real power systems through suitable interfacing facilities.

  12. Development of electric power transmission line anomaly approaching alarm system. Sodensen ijo sekkin keiho sochi no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    Kusaba, Masaro; Tabata, Takatoshi; Miyazaki, Shusuke [Kyushu Electric Power Co., Inc., Fukuoka (Japan)

    1989-03-30

    In order to plan preventive measures from the occurrence of electric power transmission line accident, a power transmission line anomaly approaching alarm system was developed to automatically alarm the operators and surveillants. The surveillance system, composed of camera, surveillance unit proper and alarm receiving portion, generates alarm and indicate hazard to the operators, when animal invades a hazardous area designated on the monitor. Wireless telegraph for the alarm transmission use used frequency around a 322MHz band with the Radio Ray law and preventive measures from noise, taken into consideration. The prototype is characterized by unnecessary ancillary fitting to the surveillance object, rare erroneous operations and high reliability. While the hazardous area can be simply designated, changed and released, as made by volume on the control panel. It is moreover easy to designate, as done by confirming the surveillance object on the display. It is also possible in multidimensional surveillance and easy to use on site. 7 figs.

  13. Improvement of the electric power sector through the access to the national power transmission system - SINTREL (Brazilian National System of Electric Power Transmission); Aperfeicoamento do setor de energia eletrica atraves do acesso a transmissao - SINTREL (Sistema Nacional de Transmissao de Energia Eletrica)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-01

    This report presents the organization and the operation of SINTREL (Brazilian National System of Electric Power Transmission), the national power transmission system, and it defines its function in the process of reform of the Brazilian electric sector. Besides showing the traditional organization of the companies and of the electric system, and the evolution of the organization of the Brazilian electric system to favor the competition.

  14. Identification of Conflicts between Transmission and Distribution System Operators when Acquiring Ancillary Services from Electric Vehicles

    DEFF Research Database (Denmark)

    Zecchino, Antonio; Knezovic, Katarina; Marinelli, Mattia

    2017-01-01

    ancillary services from flexible units. The investigation is carried out considering a 3-area power system which allows to take into account local constraints as well as system-wide needs. As outcome, this paper identifies the conflicts from both a theoretical and a practical point of view, by means...... products according to requests coming from both distribution and transmission system operators. The goal of this paper is to provide an identification procedure that is able to detect, identify and catalogue possible conflicts among the involved stakeholders that take place when requesting and/or acquiring...

  15. Investment in Electricity Transmission and Ancillary Environmental Benefits

    OpenAIRE

    Burtraw, Dallas; Bharvirkar, Ranjit; Bloyd, Cary

    2002-01-01

    Planning of the electricity transmission system generally focuses on the pros and cons of providing generation close to the source of the power demand versus remote generation linked via the transmission system. Recent electricity supply problems in the western United States have renewed interest in the role of transmission in assuring the reliability of electricity supply. Recently, the Western Governors’ Association led the development of a planning exercise that examined the tradeoffs over...

  16. Hybrid-Vehicle Transmission System

    Science.gov (United States)

    Lupo, G.; Dotti, G.

    1985-01-01

    Continuously-variable transmission system for hybrid vehicles couples internal-combustion engine and electric motor section, either individually or in parallel, to power vehicle wheels during steering and braking.

  17. IEA Implementing Agreement on Electricity Networks Analysis, Research and Development (ENARD) Annex IV: - Transmission Systems Final report

    Energy Technology Data Exchange (ETDEWEB)

    Uhlen, Kjetil; Cirio, Diego

    2012-11-01

    This is the final report from Annex IV under the IEA Implementing Agreement on Electricity Networks Analysis, Research and Development (ENARD). The Annex has worked out a long-term perspective in the evolution of transmission system planning and operation. This is motivated by the established targets for energy system developments, which in turn are affected by economic paradigms, environmental concerns, and security of supply requirements for the well-being of citizens. The Annex work concludes that urgent action is needed to make the power system able to accommodate in a safe and economic way the dramatic changes it is required to undergo. A main message is that the 'right' investment in transmission capacity, which must be stimulated, may be regarded as 'overinvestment'. Transmission lines may be 'necessary' even though there is a chance that they may be underutilised in parts of their lifetime. In reality, underinvestment could be more costly than overinvestment (contradictory to the motivation for deregulation; to improve efficiency and avoid overinvestment). This is necessary, taking into account the very long planning and consenting processes and accounting for the technical aspects in the regulatory and market framework.(auth)

  18. Overview of U.S. electric utilities: Transmission and distribution systems

    International Nuclear Information System (INIS)

    Brown, R.D.

    1994-01-01

    I hope this brief description of the US electric utility industry has been interesting and informative. No doubt many characteristics, concerns, and research efforts mirror those of the electric utility industry in South Korea. It is hoped that through workshops such as this that electric utilities, manufacturers and consultants may learn from each other for the mutual benefit of all

  19. Innovative protection and control systems for a reliable and secure operation of electrical transmission systems; Innovative Schutz- und Leitsysteme zur zuverlaessigen und sicheren elektrischen Energieuebertragung

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Sven C.; Kubis, Adreas; Rehtanz, Christian [Technische Univ. Dortmund (Germany). Inst. fuer Energiesysteme, Energieeffizienz und Energiewirtschaft (ie3); Brato, Sebastian; Goetze, Juergen [Technische Univ. Dortmund (Germany). Arbeitsgebiet Datentechnik

    2012-07-01

    The integration of European electricity markets as well as the increasing power feed-in by renewable energy sources pose new challenges to the operation of electrical transmission systems. Modern protection and control systems based on wide-area information can substantially contribute to a reliable and secure system operation even against the background of future demands. In this paper research advances regarding new applications for wide-area monitoring, protection and control as well as an integrated simulation for power and ICT systems are presented that have been developed in the course of DFG research unit FOR1511 at TU Dortmund. (orig.)

  20. Essays on electricity transmission investment and financial transmission rights

    Science.gov (United States)

    Shang, Wenzhuo

    The U.S. electric power industry has been going through fundamental restructuring and realignment since the 1990's. Many issues and problems have emerged during the transition, and both economists and engineers have been looking for the solutions fervently. In this dissertation, which consists primarily of three essays, we apply economics theory and techniques to the power industry and address two related issues, transmission investment and financial transmission rights (FTRs). The first essay takes the decentralized perspective and investigates the efficiency attribute of market-based transmission investment under perfect competition. We clarify, for the first time, the nature of the externality created by loop flows that causes transmission investment to be inefficient. Our findings have important implications for better understanding of transmission market design and creating incentives for efficient transmission investment. In the second essay, we define several rules for allocating transmission investment cost within the framework of cooperative game theory. These rules provide fair, stable or efficient cost allocations in theory and are good benchmarks against which the allocation mechanism in practice can be compared and improved upon. In the last essay, we make exploratory efforts in analyzing and assessing empirically the performance of the Midwest independent system operator (MISO) FTR auction market. We reveal some stylized facts about this young market and find that it is not efficient under the risk-neutrality assumption. We also point out and correct the drawbacks in previous related work and suggest about more complete empirical work in future. In all, this dissertation makes both theoretic and empirical analysis of the two hot issues related to the power industry and comes up with findings that have important implications for the development of this industry.

  1. Design of synchromesh mechanism to optimization manual transmission's electric vehicle

    Science.gov (United States)

    Zainuri, Fuad; Sumarsono, Danardono A.; Adhitya, Muhammad; Siregar, Rolan

    2017-03-01

    Significant research has been attempted on a vehicle that lead to the development of transmission that can reduce energy consumption and improve vehicle efficiency. Consumers also expect safety, convenience, and competitive prices. Automatic transmission (AT), continuously variable transmission (CVT), and dual clutch transmission (DCT) is the latest transmission developed for road vehicle. From literature reviews that have been done that this transmission is less effective on electric cars which use batteries as a power source compared to type manual transmission, this is due to the large power losses when making gear changes. Zeroshift system is the transmission can do shift gears with no time (zero time). It was developed for the automatic manual transmission, and this transmission has been used on racing vehicles to eliminate deceleration when gear shift. Zeroshift transmission still use the clutch to change gear in which electromechanical be used to replace the clutch pedal. Therefore, the transmission is too complex for the transmission of electric vehicles, but its mechanism is considered very suitable to increase the transmission efficiency. From this idea, a new innovation design transmission will be created to electric car. The combination synchromesh with zeroshift mechanism for the manual transmission is a transmission that is ideal for improving the transmission efficiency. Installation synchromesh on zeroshift mechanism is expected to replace the function of the clutch MT, and assisted with the motor torque setting when to change gear. Additionally to consider is the weight of the transmission, ease of manufacturing, ease of installation with an electric motor, as well as ease of use by drivers is a matter that must be done to obtain a new transmission system that is suitable for electric cars.

  2. Electricity transmission pricing. How contracts must reflect costs

    International Nuclear Information System (INIS)

    Shuttleworth, G.

    1996-01-01

    Two basic structures of transmission systems are distinguished: transmission channels offered through an integrated electric utility and open access offered over an independent network. The first structure allows the application of 'top-down pricing', where transmission prices are derived from customer tariffs less avoidable generation costs. Transmission prices in the second structure must be derived from a 'bottom-up' analysis of transmission costs, including building capacity, marginal losses, and congestion. 5 refs

  3. A literature survey on asset management in electrical power [transmission and distribution] system

    NARCIS (Netherlands)

    Khuntia, S.R.; Rueda Torres, José L.; Bouwman, S.; van der Meijden, M.A.M.M.

    2016-01-01

    Asset management is one of the key components in a transforming electric power industry. Electric power industry is undergoing significant changes because of technical, socio-economical and environmental developments. Also, because of restructuring and deregulation, the focus has been on

  4. Electricity transmission pricing and technology

    International Nuclear Information System (INIS)

    Einhorn, M.; Siddiqi, R.

    1996-01-01

    The electric utility industry and its stake holders in the United States appear to be at a critical juncture in time. Powerful forces of global proportions are propelling the industry instinctively and in a secular fashion towards restructuring. That the industry will change is a fait accomplii. The nature and timing of the change is still a matter of intense debate, however. Because of the evolution of the industry into its present-day form, i.e. regulated local monopolies in their designated franchise service territories, the relative roles and expectations of various institutions would have to change to conform to the new state in the future. In either encouraging, or allowing this change to happen, society is essentially saying that future societal welfare would be better served by the changed structure contemplated. What that assumption translates into in more direct terms is that creation of future wealth would be better accomplished through redistribution of wealth today. Thoughtful individuals recognize the enormous responsibility placed upon the various entities empowered with jurisdiction over the timing and nature of the structural change. They are trying hard to bring analytical rigor to bear on the debate. One very critical element of this debate on restructuring is the issue of the treatment of transmission. The issue has been variously labeled transmission access, or pricing. Volumes have been written and spoken on this topic. We felt that there was a pressing need to assemble a volume which would serve as a one-stop source for varied viewpoints and comprehensive coverage of the subject, both technical and economic. 58 figs., 23 tabs., 103 refs

  5. A Common Definition of the System Operators' Core Activities[Electric Power Transmission System Operator

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-02-15

    In this report a common definition of the system operator's core activities in the Nordic countries is identified and also a list of non-core activities is introduced. As a starting point the common tasks for system responsibility as identified by Nordel has been used for the work. The term TSO (Transmission System Operator) is employed as a common denominator in the report. It is found out that the TSOs carry out common core activities in the roles as a transmission operator, a system operator and a balance settlement responsible. The core activities for the TSO as a transmission network operator are: Maintain the adequate transmission system in the long run and network development plan on the national as well as on the Nordic level using sophisticated analysis and planning methods and tools. Plan the transmission network on the national as well as on the Nordic level utilising new investments, renewal and maintenance of existing network components so that the network is secure to operate and adequate transmission capacity is guaranteed. Aim at timely network expansions using enhanced information exchange between the Nordic TSOs, and on the national level between the TSO and distribution and regional network operators, large consumers and large producers. Secure the technical compatibility with networks across the border and within a country by establishing connection requirements on the national level and ensuring that the national requirements are compatible across the Nordic power system. The core activities for the TSO as a system operator are: Define common technical requirements for the secure system operation using common planning, operation, connection and data exchange procedures. Secure the system operation with the operational planning for the following year by using information exchange between TSOs enabling the TSOs to make the best possible forecast of the global grid situation in order to assess the flows in their network and the available

  6. Electricity transmission congestion costs: A review of recent reports

    Energy Technology Data Exchange (ETDEWEB)

    Lesieutre, Bernard C.; Eto, Joseph H.

    2003-10-01

    Recently, independent system operators (ISOs) and others have published reports on the costs of transmission congestion. The magnitude of congestion costs cited in these reports has contributed to the national discussion on the current state of U.S. electricity transmission system and whether it provides an adequate platform for competition in wholesale electricity markets. This report reviews reports of congestion costs and begins to assess their implications for the current national discussion on the importance of the U.S. electricity transmission system for enabling competitive wholesale electricity markets. As a guiding principle, we posit that a more robust electricity system could reduce congestion costs; and thereby, (1) facilitate more vibrant and fair competition in wholesale electricity markets, and (2) enable consumers to seek out the lowest prices for electricity. Yet, examining the details suggests that, sometimes, there will be trade-offs between these goals. Therefore, it is essential to understand who pays, how much, and how do they benefit in evaluating options (both transmission and non-transmission alternatives) to address transmission congestion. To describe the differences among published estimates of congestion costs, we develop and motivate three ways by which transmission congestion costs are calculated in restructured markets. The assessment demonstrates that published transmission congestion costs are not directly comparable because they have been developed to serve different purposes. More importantly, critical information needed to make them more comparable, for example in order to evaluate the impacts of options to relieve congestion, is sometimes not available.

  7. Transmission investment in the Peruvian electricity market: Theory and applications

    International Nuclear Information System (INIS)

    Ruiz, Erix; Rosellón, Juan

    2012-01-01

    This research presents an application of the mechanism in (HRV) to promote electricity transmission network expansion in the Peruvian electricity transmission system known as SEIN (Sistema Eléctrico Interconectado Nacional). The HRV mechanism combines the merchant and regulatory approaches to promote investment into transmission grids. This mechanism gives incentives for efficient investment in expansion of the network by rebalancing over time the fixed and variable charges of a two-part tariff in the framework of a wholesale electricity market with locational pricing. The expansion of the network is carried out through the sale of Financial Transmission Rights (FTRs) for the congested lines. The mechanism is applied for 103 nodes of the SEIN using detailed characteristics of generators, nodes and transmission lines. Under Laspeyres weights and linear cost of expansion of transmission capacity, it is shown that prices converge to lower price levels as a result of increased transmission capacity.

  8. Wireless (Power Transfer Transmission of Electrical Energy (Electricity Intended for Consumer Purposes up to 50 W

    Directory of Open Access Journals (Sweden)

    Marek Piri

    2016-01-01

    Full Text Available This project deals with Power Semiconductor Systems PSS for wireless transmission of electricity to the power of 50~W with regard to the distance and transmission efficiency. We decided to use electromagnetic resonance for electrical energy transmission. For experimental verification, we have wound two coils of identical dimensions. At a given power transmission solutions, we obtain the highest efficiency η = 70% at a distance of 5 cm, where the transmitted power was 48 W.

  9. Distributed decision-making in electric power system transmission maintenance scheduling using multi-agent systems (MAS)

    Science.gov (United States)

    Zhang, Zhong

    In this work, motivated by the need to coordinate transmission maintenance scheduling among a multiplicity of self-interested entities in restructured power industry, a distributed decision support framework based on multiagent negotiation systems (MANS) is developed. An innovative risk-based transmission maintenance optimization procedure is introduced. Several models for linking condition monitoring information to the equipment's instantaneous failure probability are presented, which enable quantitative evaluation of the effectiveness of maintenance activities in terms of system cumulative risk reduction. Methodologies of statistical processing, equipment deterioration evaluation and time-dependent failure probability calculation are also described. A novel framework capable of facilitating distributed decision-making through multiagent negotiation is developed. A multiagent negotiation model is developed and illustrated that accounts for uncertainty and enables social rationality. Some issues of multiagent negotiation convergence and scalability are discussed. The relationships between agent-based negotiation and auction systems are also identified. A four-step MAS design methodology for constructing multiagent systems for power system applications is presented. A generic multiagent negotiation system, capable of inter-agent communication and distributed decision support through inter-agent negotiations, is implemented. A multiagent system framework for facilitating the automated integration of condition monitoring information and maintenance scheduling for power transformers is developed. Simulations of multiagent negotiation-based maintenance scheduling among several independent utilities are provided. It is shown to be a viable alternative solution paradigm to the traditional centralized optimization approach in today's deregulated environment. This multiagent system framework not only facilitates the decision-making among competing power system entities, but

  10. Risk management in electricity markets emphasizing transmission congestion

    International Nuclear Information System (INIS)

    Kristiansen, Tarjei

    2004-01-01

    This thesis analyzes transmission pricing, transmission congestion risks and their associated hedging instruments as well as mechanisms for stimulating investments in transmission expansion. An example of risk management in the case of a hydropower producer is included. After liberalization and restructuring of electricity markets, risk management has become important. In particular the thesis analyzes risks due to transmission congestion both in the short- and long-term (investments) for market players such as generators, loads, traders, independent system operators and merchant investors. The work is focused on the northeastern United States electricity markets and the Nordic electricity markets. The first part of the thesis reviews the literature related to the eight research papers in the thesis. This describes the risks that are relevant for an electricity market player and how these can be managed. Next, the basic ingredients of a competitive electricity market are described including the design of the system operator. The transmission pricing method is decisive for hedging against transmission congestion risks and there is an overview of transmission pricing models considering their similarities and differences. Depending on the transmission pricing method used, locational or area (zonal) pricing, the electricity market players can use financial transmission rights or Contracts for Differences, respectively. In the long-term it is important to create mechanisms for investments in transmission expansion and the thesis describes one possible approach and its potential problems. The second part comprises eight research papers. It presents empirical analyses of existing markets for transmission congestion derivatives, theoretical analyses of transmission congestion derivatives, modeling of merchant long-term financial transmission rights, theoretical analysis of the risks of the independent system operator in providing financial transmission rights, an analysis

  11. Current transformer model with hysteresis for improving the protection response in electrical transmission systems

    Science.gov (United States)

    Matussek, Robert; Dzienis, Cezary; Blumschein, Jörg; Schulte, Horst

    2014-12-01

    In this paper, a generic enhanced protection current transformer (CT) model with saturation effects and transient behavior is presented. The model is used for the purpose of analysis and design of power system protection algorithms. Three major classes of protection CT have been modeled which all take into account the nonlinear inductance with remanence effects. The transient short-circuit currents in power systems are simulated under CT saturation condition. The response of a common power system protection algorithm with respect to robustness to nominal parameter variations and sensitivity against maloperation is demonstrated by simulation studies.

  12. Current transformer model with hysteresis for improving the protection response in electrical transmission systems

    International Nuclear Information System (INIS)

    Matussek, Robert; Dzienis, Cezary; Blumschein, Jörg; Schulte, Horst

    2014-01-01

    In this paper, a generic enhanced protection current transformer (CT) model with saturation effects and transient behavior is presented. The model is used for the purpose of analysis and design of power system protection algorithms. Three major classes of protection CT have been modeled which all take into account the nonlinear inductance with remanence effects. The transient short-circuit currents in power systems are simulated under CT saturation condition. The response of a common power system protection algorithm with respect to robustness to nominal parameter variations and sensitivity against maloperation is demonstrated by simulation studies

  13. VT Electric Transmission Line Corridors - corridor lines

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The ELTRN layer depicts electric transmission line corridors in Vermont. Various methods have been used to digitize features. The data layer...

  14. VT Electric Transmission Line Corridors - substation points

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The ELTRN layer depicts electric transmission line corridors in Vermont. Various methods have been used to digitize features. The data layer...

  15. Transmission : roadway to a competitive electricity market

    Energy Technology Data Exchange (ETDEWEB)

    Thon, S. [AltaLink L.P., AB (Canada)

    2002-07-01

    Having a variety of suppliers, marketers and retailers is the key to developing a successful electricity market which is more competitive on pricing, with less price volatility, more innovative customer products and higher levels of customer services. Some areas of Alberta are developing their own power markets with limited capacity to interact. These include Pincher Creek, Empress, Calgary, Edmonton, and Fort McMurray. It was noted that increasing transmission capacity is the key to ensuring a bigger and more competitive electricity market. Transmission constraints only encourage a small number of suppliers to control the market. The current cost of transmission capacity accounts for less than 5 per cent of an average residential customer's bill, but it plays a major role in providing more choice to competitive electricity suppliers. Developing more transmission capacity will create an even more competitive market that benefits both consumers and suppliers. Prices in Alberta have been very volatile in the past couple of years because of supply and demand issues, and there is a need to increase market liquidity. Alberta's Transmission Administrator is looking to expand the transmission network to alleviate constraints and to lower the cost of power generation, regardless of location. These expansions are not expected to affect customers' bills by more than 2 to 3 per cent. Such transmission concerns are being felt all over North America. The Federal Energy Regulatory Commission (FERC) in the United States also recognizes the link between transmission and creating a competitive electricity market.

  16. Evaluation of the reliability of electric power transmission systems; Evaluacion de confiabilidad de sistemas de transmision de energia electrica

    Energy Technology Data Exchange (ETDEWEB)

    Vega Ortiz, Miguel

    1989-07-01

    In this thesis it is attacked the problem of Reliability Evaluation of the Electrical Power Transmission Systems for aims of its integral planning. Once described the problem the indexes that measure the electric power systems reliability are presented. Later the methods to evaluate the transmission nets, such as the Contingencies Enumeration, the Monte Carlo, the one of Markov and the methods for complex systems such as the Minimum Interruptions, are described. This last one is widely developed for the advantages that its application presents in the planning of large and complex networks. The method of minimum interruptions consists of two big steps: To determine the minimum interruptions for the load points and to calculate the reliability indexes in base of the minimum interruptions. The conventional algorithms for the determination of minimum interruptions consider a problem for each load point in an independent form going through a determination of minimum tracks. In this type of algorithms the CPU time and the space in memory required grow exponentially for the case of large transmission systems, which represents a strong restriction for its application. In order to solve this problem a methodology was established in which the system is modeled by means of a grapho and the minimum interruptions are determined with an algorithm based on the construction of cycles in the dual grapho. With these interruptions the connectivity and the capacity of the network is evaluated, obtaining the reliability indexes for each bus and the system. These indexes are calculated with the equivalent representation for complex systems of series parallel connections defined by the minimum interruptions. One of the fundamental objectives in this study is to integrate the reliability to the planning process, with the concept of the expected value of the non-supplied energy and its penalty cost. In order to demonstrate the capacity, effectiveness and rapidity of the new implemented

  17. Transmission and wind investment in a deregulated electricity industry

    DEFF Research Database (Denmark)

    Maurovich-Horvat, Lajos; Boomsma, Trine Krogh; Siddiqui, Afzal S.

    2015-01-01

    Adoption of dispersed renewable energy technologies requires transmission network expansion. Besides the transmission system operator (TSO), restructuring of electricity industries has introduced a merchant investor (MI), who earns congestion rents from constructing new lines. We compare these tw...... proportion of energy is produced by wind. In effect, withholding of generation capacity by producers prompts more transmission investment since the TSO aims to increase welfare by subsidizing wind and the MI creates more flow to maximize profit....

  18. Efficiency and environmental factors in the US electricity transmission industry

    International Nuclear Information System (INIS)

    Llorca, Manuel; Orea, Luis; Pollitt, Michael G.

    2016-01-01

    The electricity industry in most developed countries has been restructured over recent decades with the aim of improving both service quality and firm performance. Regulated segments (e.g. transmission) still provide the infrastructure for the competitive segments and represent a significant share of the total price paid by final customers. However there is a lack of empirical studies that analyse firms' performance in the electricity transmission sector. In this paper an empirical analysis of US electricity transmission companies is conducted for the period 2001–2009. We use alternative stochastic frontier models that allow us to identify the determinants of firms' inefficiency. These models also permit us to control for weather conditions, potentially one of the most decisive uncontrollable factors in electricity transmission. Our results suggest that weather conditions clearly have an influence on transmission costs and that there is room for improvement in the management of US electricity transmission systems. Regulators should also be aware that more adverse conditions generate higher levels of inefficiency, and that achieving long-term efficiency improvements tends to worsen firms' short-term relative performance. - Highlights: • We analyse firms' performance in the US electricity transmission industry. • Alternative SFA models are estimated to identify determinants of firms' efficiency. • Our results indicate that firms' efficiency has declined and diverged over time. • We find that more adverse conditions generate higher levels of inefficiency.

  19. Development of Regenerative Braking Co-operative Control System for Automatic Transmission-based Hybrid Electric Vehicle using Electronic Wedge Brake

    OpenAIRE

    Ko, Jiweon; Ko, Sungyeon; Bak, Yongsun; Jang, Mijeong; Yoo, Byoungsoo; Cheon, Jaeseung; Kim, Hyunsoo

    2013-01-01

    This research proposes a regenerative braking co-operative control system for the automatic transmission (AT)-based hybrid electric vehicle (HEV). The brake system of the subject HEV consists of the regenerative braking and the electronic wedge brake (EWB) friction braking for the front wheel, and the hydraulic friction braking for the rear wheel. A regenerative braking co-operative control algorithm is suggested for the regenerative braking and friction braking, which distributes the braking...

  20. Electric power transmission pricing regulations and efficiency

    International Nuclear Information System (INIS)

    Goldoni, G.

    1999-01-01

    An efficient-price mechanism for electricity transmission is very hard to find, essentially because of the natural monopoly condition of the grid and its peculiar interactions with generation. The use of Optimal Power Flow Models is difficult to implement and could be easily distorted by strategical behaviour of generators. These models, however, could became a valuable efficiency-test for actual transmission charges and codes [it

  1. Electrical energy systems

    CERN Document Server

    El-Hawary, Mohamed E

    2007-01-01

    Features discussions ranging from the technical aspects of generation, transmission, distribution, and utilization to power system components, theory, protection, and the energy control center that offer an introduction to effects of deregulating electric power systems, blackouts and their causes, and minimizing their effects.

  2. Transient signals on transmission lines an introduction to non-ideal effects and signal integrity issues in electrical systems

    CERN Document Server

    Peterson, Andrew

    2009-01-01

    This lecture provides an introduction to transmission line effects in the time domain. Fundamentals including time of flight, impedance discontinuities, proper termination schemes, nonlinear and reactive loads, and crosstalk are considered. Required prerequisite knowledge is limited to conventional circuit theory. The material is intended to supplement standard textbooks for use with undergraduate students in electrical engineering or computer engineering. The contents should also be of value to practicing engineers with interests in signal integrity and high-speed digital design.Table of Cont

  3. ECRH transmission system

    International Nuclear Information System (INIS)

    Tancredi, J.

    1983-01-01

    Hughes, Electron Dynamics Division is developing gyrotrons for ECRH requirements. In the development program, techniques have been evolved for transmission system components. These techniques include over-moded waveguide tapers, high average power windows, and rf water loads for testing

  4. Investment in Electricity Generation and Transmission: Decision Making Under Uncertainty

    DEFF Research Database (Denmark)

    Conejo, Antonio J.; Baringo, Luis; Kazempour, Jalal

    This book provides an in-depth analysis of investment problems pertaining to electric energy infrastructure, including both generation and transmission facilities. The analysis encompasses decision-making tools for expansion planning, reinforcement, and the selection and timing of investment...... undergraduate and graduate students in the fields of electric energy systems, operations research, management science, and economics. Practitioners in the electric energy sector will also benefit from the concepts and techniques presented here....

  5. Least cost pathways to a low carbon electricity system for Australia: impacts of transmission augmentation and extension

    Science.gov (United States)

    Dargaville, R. J.

    2016-12-01

    Designing the pathway to a low carbon energy system is complex, requiring consideration of the variable nature of renewables at the hourly timescale, emission intensity and ramp rate constraints of dispatchable technologies (both fossil and renewable) and transmission and distribution network limitations. In this work, an optimization framework taking into account these considerations has been applied to find the lowest cost ways to reduce carbon emissions by either 80% or 100% in 2050 while keeping the system operating reliably along the way. Technologies included are existing and advanced coal and gas technologies (with and without carbon capture and storage), rooftop PV, utility scale PV, concentrating solar thermal, hydro with and without pumped storage, bioenergy, and nuclear. In this study we also also the optimisation to increase transmission capacity along existing lines, and to extend key trunk lines into currently unserved areas. These augementations and extensions come at a cost. The otpimisation chooses these options when the benefits of accessing high quality renewable energy resources outweights the costs. Results show that for the 80% emission reduction case, there is limited need for transmission capacity increase, and that the existing grid copes well with the increased flows due to conversion to distrubuted renewable energy resources. However, in the 100% case the increased reliance on renewables means that signficant transmission augmentation is beneficial to the overall cost. This strongly suggests that it is important to understand the long term emission target early so that infrastructure investments can be optimised.

  6. Optimal pricing of transmission and distribution services in electricity supply

    International Nuclear Information System (INIS)

    Farmer, E.D.; Cory, B.J.; Perera, B.L.P.P.

    1995-01-01

    A new strategy for the separate pricing of transmission and distribution services in electricity supply is formulated and evaluated. The proposed methodology is a multivariate transmission generalisation of the method of peak load pricing previously applied to the optimal time-of-use pricing of generation on a power system with diverse generation technologies and with elastic demand. The method allocates both capacity and operational costs on a time-of-use basis, in an optimal manner, that avoids cross-subsidisation both between differing supply system participants and differing times of usage. The method is shown to promote the optimal development of the transmission, distribution or interconnecting systems, rewarding justified investments in transmission capacity and discouraging overinvestment. It also leads to appropriate returns on invested capital without significant 'revenue reconciliation'. This contrasts with SRMC pricing as is shown by a comparative revenue evaluation. It is concluded that the method has wide potential application in electricity supply. (author)

  7. ETR transmission systems

    International Nuclear Information System (INIS)

    Metzler, D.

    1983-01-01

    The presentation concentrates on factors associated with transmission systems for reactors and/or reactor relevant devices. For present day mirrors and their upgrades where power levels are in the few hundred kW range, waveguide systems with mode control are preferred. Beyond the early 1990's time frame are the ETR DEMO and reactor devices. These require injected power levels of about 75 MW. If only power oscillators are available at that time, then a MARS like transmission system may be appropriate or possibly a guided wave waveguide

  8. The electric power engineering handbook electric power generation, transmission, and distribution

    CERN Document Server

    Grigsby, Leonard L

    2012-01-01

    Featuring contributions from worldwide leaders in the field, the carefully crafted Electric Power Generation, Transmission, and Distribution, Third Edition (part of the five-volume set, The Electric Power Engineering Handbook) provides convenient access to detailed information on a diverse array of power engineering topics. Updates to nearly every chapter keep this book at the forefront of developments in modern power systems, reflecting international standards, practices, and technologies. Topics covered include: * Electric Power Generation: Nonconventional Methods * Electric Power Generation

  9. Impact of GB transmission charging on renewable electricity generation

    International Nuclear Information System (INIS)

    2006-01-01

    The Government is committed to meeting its objective of producing 10% of UK electricity supplies from renewable sources by 2010, subject to the cost to the consumer being acceptable. It is generally believed that northern Scotland - and the Highlands and Islands in particular - will be a significant source of renewable energy in future, mostly in the form of wind power; wave and tidal energy may also be important. The National Grid Company (NGC) is responsible for formulating a cost-reflective and. non-discriminatory electricity transmission charging methodology for Great Britain (GB). This determines Transmission Network Use of System (TNUoS) tariffs, which are paid by transmission-connected generators and suppliers for the use of the high voltage transmission network. Following the publication of National Grid Company's 'GB Transmission Charging: Initial Thoughts' document on 16 December 2003, there was particular concern that the level of future Transmission Network Use of System (TNUoS) tariffs in northern Scotland might impede the achievement of the Government's 2010 target for renewable electricity supplies. That document and subsequent revisions indicate that generation TNUoS charges in northern Scotland were likely to be significantly higher than anywhere else in GB. The study attempts to quantify the effect of the proposed GB-wide TNUoS charging methodology on the future growth of renewable electricity so as to ascertain the impact on the likelihood of meeting the Government's 2010 target. (UK)

  10. Electric Dipole Theory of Chemical Synaptic Transmission

    Science.gov (United States)

    Wei, Ling Y.

    1968-01-01

    In this paper we propose that chemicals such as acetylcholine are electric dipoles which when oriented and arranged in a large array could produce an electric field strong enough to drive positive ions over the junction barrier of the post-synaptic membrane and thus initiate excitation or produce depolarization. This theory is able to explain a great number of facts such as cleft size, synaptic delay, nonregeneration, subthreshold integration, facilitation with repetition, and the calcium and magnesium effects. It also shows why and how acetylcholine could act as excitatory or inhibitory transmitters under different circumstances. Our conclusion is that the nature of synaptic transmission is essentially electrical, be it mediated by electrical or chemical transmitters. PMID:4296121

  11. National development plan for transmission arrangement in the electric power system 1995-2005; Nasjonal utbyggingsplan for overfoeringsanlegg i elkraftsystemet 1995-2005

    Energy Technology Data Exchange (ETDEWEB)

    Moi, K.A.; Trengereid, F.

    1996-09-01

    The report concerns the national development plan for the electric power transmission system in Norway. The aim of the plan is to give a simple and collected survey of estimated demand of investment connected to the regional and central grids in the period from 1995 to 2005 based on these development plans, and to give a survey over the different power and energy prognoses being used. There is emphasized that the work of planning is a continuous process where changed premises can make an influence on both the schedule and the extent of necessary measures. The investment is calculated to be about NOK 15 billion in the period mentioned which comprise both new system designs and modernization of existing transmission systems. Dimensioned power capacity and the energy consumption are assumed to increase on an average of about 1.8 per cent towards the year of 2010. 10 figs., 2 tabs.

  12. New South Wales' new electricity transmission authority

    International Nuclear Information System (INIS)

    Fahey, J.

    1995-01-01

    The latest milestone in electricity reform in NSW was the formation of a new statutory authority, the Electricity Transmission Authority (ETA), to take over and operate the transmission assets of Pacific Power, formerly the New South Wales Electricity Commission. The ETA will be operational from 1 February 1995, in time for the proposed commencement of a national electricity market on 1 July 1995. The forces of competition are being used to improve the efficiency of the industry, to empower consumers with greater choice and to open up new opportunities for private-sector participation in the industry. Potentially commercial activities such as coal mines have been separated from the operational arm of Pacific Power so that they have to compete with the private sector in supplying power stations. Significant reductions have been made in the price of electricity to reduce existing cross-subsidizations so that commercial and industrial customers gain the biggest benefits. The new ETA will pay dividends to the NSW government, as private companies pay dividends to their shareholders, and it will be subject to the federal tax-equivalent regime. 2 photos

  13. Hawaii Electric System Reliability

    Energy Technology Data Exchange (ETDEWEB)

    Loose, Verne William [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Silva Monroy, Cesar Augusto [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2012-08-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers’ views of reliability “worth” and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers’ views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

  14. Hawaii electric system reliability.

    Energy Technology Data Exchange (ETDEWEB)

    Silva Monroy, Cesar Augusto; Loose, Verne William

    2012-09-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

  15. Transmission congestion management in the electricity market

    Science.gov (United States)

    Chen, Yue

    2018-04-01

    In this paper we mainly discuss how to optimize the arrangement to decrease the loss of each line when the power generation side of the system transmission congestion occurs in a safe and economical manner. We respectively set the adjust model if the transmission can be eliminated which can calculate the best scheme and safety margin model when transmission cannot be eliminated which is a multi-objective planning problem. We solve the two models on the condition of the load power demands are 982.4MW and 1052.8 MW by Lingo and get the optimal management scheme.

  16. Wireless data signal transmission system

    DEFF Research Database (Denmark)

    2014-01-01

    The present invention relates to a method for providing a radio frequency signal for transmission, a system for providing a radio frequency signal for transmission and a method for wireless data transmission between a transmitter and a receiver.......The present invention relates to a method for providing a radio frequency signal for transmission, a system for providing a radio frequency signal for transmission and a method for wireless data transmission between a transmitter and a receiver....

  17. Electricity transmission and distribution in Ontario : a look ahead

    International Nuclear Information System (INIS)

    2004-01-01

    This paper addressed changes and challenges that can guide the Ontario government in developing a policy framework for sustainable development in the electric power industry, particularly the power distribution and transmission sector. The government is taking action to adopt a balanced approach to energy policy that combines features of both regulated and competitive industries. It is taking a more responsible approach to electricity pricing that ends subsidies in order to reflect the true cost of electricity. The major issues facing the wires sector are: improving efficiencies by consolidating activities, streamlining operations and unbundling power transmission and distribution into separate entities; developing distributed generation; and, investing in new transmission to relieve congestion. It was noted that distributed generation will become more important as coal-fired generation facilities are replaced. Distributed generation offers many benefits for the wires sector, including delaying the need to upgrade the existing wires network, offering local solutions to transmission constraints, reducing system losses, improving load factor and improving the reliability of supply. An increase in distributed generation will likely mean that more of Ontario's electricity supply will come from small-scale renewable generation facilities. The government promotes private sector investment to assist in the rebuilding of the electricity sector

  18. A new methodology for establishing a system for cross-border transmission tariffication in the internal electricity market

    International Nuclear Information System (INIS)

    Glavitsch, H.; Andersson, G.

    2001-01-01

    Several organisations are working on a scheme for cross-border tariffication as the so-called Florence forum indicates. So far, a provisional concept created by ETSO (European Transmission System Operators) evolved which is oriented towards covering costs but is not quite cost-reflective and does not produce economic signals for the market players. In the present project a flow-oriented model and a corresponding methodology have been developed which derive compensations within super nodes standing for aggregated networks of the countries along transit and domestic paths. Specific fees are derived from overall network costs but may be applied in a flexible way to represent the realistic usage of the horizontal network for transits and domestic supply. Charging of costs can be oriented towards consumers or generators. A combination of shares of costs originally determined for consumers and generators is also possible. In such a way the model is flexible to fulfill the requirements of regulators, operators and the European Commission. Measured flow data of the UCTE network have been provided to check the concept in various directions, i.e. based on different parameters such as uniform and individual postage stamps, compensations for transits only and more elaborate networks of super nodes. The concept is also able to cope with circular flows within the real UCTE network. The methodology is suited for an application in a decentralised fashion as the transmission system operator needs to communicate with its neighboring operator only, i.e. there is no need for a centralised clearing office. (author)

  19. Downhole transmission system comprising a coaxial capacitor

    Science.gov (United States)

    Hall, David R [Provo, UT; Pixton, David S [Lehi, UT; Johnson, Monte L [Orem, UT; Bartholomew, David B [Springville, UT; Hall, Jr., H. Tracy; Rawle, Michael [Springville, UT

    2011-05-24

    A transmission system in a downhole component comprises a plurality of data transmission elements. A coaxial cable having an inner conductor and an outer conductor is disposed within a passage in the downhole component such that at least one capacitor is disposed in the passage and having a first terminal coupled to the inner conductor and a second terminal coupled to the outer conductor. Preferably the transmission element comprises an electrically conducting coil. Preferably, within the passage a connector is adapted to electrically connect the inner conductor of the coaxial cable and the lead wire. The coaxial capacitor may be disposed between and in electrically communication with the connector and the passage. In another embodiment a connector is adapted to electrical connect a first and a second portion of the inner conductor of the coaxial cable and a coaxial capacitor is in electrical communication with the connector and the passage.

  20. Transmission and wind investment in a deregulated electricity industry

    DEFF Research Database (Denmark)

    Maurovich-Horvat, Lajos; Boomsma, Trine Krogh; Fleten, Stein-Erik

    2013-01-01

    carrying out investment in wind farms. In this paper, we analyse the interaction between the two conflicting objectives under various assumptions about the electricity market structure and the degree of producers' market power. Via a three-node illustrative example, we show that a merchant investor...... the auspices of a regulated welfare-maximising planner, recent restructuring of electricity industries has introduced a merchant model for transmission investment, which provides congestion rents from construction of a new line. Thus, the merchant investor's incentives are different from those of producers...... typically builds less transmission capacity than a welfare-maximising transmission system operator or central planner. Although social welfare is lower and nodal prices are generally higher with a merchant investor and when producers are assumed to behave à la Cournot, the effect of lower price response...

  1. The benefits of transmission expansions in the competitive electricity markets

    International Nuclear Information System (INIS)

    Bresesti, Paola; Calisti, Roberto; Cazzol, Maria Vittoria; Gatti, Antonio; Vaiani, Andrea; Vailati, Riccardo; Provenzano, Dario

    2009-01-01

    The paper presents an innovative method for assessing simultaneously technical and economic benefits of transmission expansions. This method takes into account the new needs of the transmission planning process for competitive electricity markets, in which benefits of major transmission expansions include: (a) improved reliability, (b) increased availability of efficient supply and (c) increased competition among suppliers. The fundamental elements of the REliability and MARKet (REMARK) tool, which we implemented based on the aforementioned method, are: a yearly probabilistic simulation of power system operation; use of the non-sequential Monte Carlo method to pick the operational status of the network elements; full network representation; adoption of the simplified direct current model; quantitative assessment of the reliability benefits through the expected energy not supplied index; simulation of the strategic behaviour of suppliers based on a simplified model that correlates the price-cost mark-up to structural market variables (residual supply index and demand); a quantitative assessment of ''economic'' benefits through the calculation of the social welfare index. A test case application of the tool on the IEEE 24-bus reliability test system shows that the method can assess benefits of transmission expansions, in addition to the overall social perspective, for each market zone as well as separately for consumers, producers and transmission system operators. The results emphasize that the effect of transmission expansions in mitigating market power may be significant and that a simple and traditional cost-based approach may lead to a wrong evaluation of benefits given by transmission expansions. (author)

  2. Electricity transmission arrangements in Great Britain: Time for change?

    International Nuclear Information System (INIS)

    Strbac, Goran; Pollitt, Michael; Konstantinidis, Christos Vasilakos; Konstantelos, Ioannis; Moreno, Rodrigo; Newbery, David; Green, Richard

    2014-01-01

    In Great Britain (GB) and across Europe significant investment in electricity transmission is expected over the coming years as decarbonisation and market integration efforts are intensified. However, there is also significant uncertainty with the amount, location and timing of new generation connection, which in turn will drive the transmission investment needs. Given the absence of efficient market design, we identify three key areas of concern with the current transmission investment arrangements: (i) a mis-aligned incentives framework for transmission investment and operation; (ii) lack of coordination of investment and operation; and (iii) conflicts of interest. We then propose three options for future evolution of transmission regimes, which cover the full spectrum of institutional arrangements with respect to transmission planning and delivery, i.e. how and who plans, owns, builds and operates the transmission system. For each option we present: key characteristics; evolution of the current regimes; the ability of the option to address the concerns; and key strengths and weaknesses. Overall, we conclude in the case of GB (this conclusion could be extended to other European countries) that the most appropriate option would be that of an Independent System Operator (ISO) who would be responsible for planning and operating the transmission system. - Highlights: • We identify three key areas of concern with the current transmission arrangements. • We then propose three options for transmission network planning and delivery. • Key strengths and weaknesses of each above option are identified and studied. • We conclude that the most appropriate option for GB would be that of an ISO

  3. Market tools: the immaterial part of the electricity transmission network

    International Nuclear Information System (INIS)

    Maillard, Dominique

    2014-01-01

    The author first evokes the activities of RTE (Reseau de transport d'electricite - the French power transmission network) to improve the performance of its technical and industrial equipment (notably equipment evolution, maintenance policies) with, for example, the installation of a fibre optic network for network control automation, the development of software for a better exploitation and steering of electricity fluxes, notably the electricity produced by wind and photovoltaic power. He more particularly addresses the role of RTE in the construction of the electricity market. He outlines the role of the European electricity market in the economic optimization, the new approaches and tools for a higher flexibility of the electric system, the expertise of RTE, and the perspective of always more smart grids

  4. 76 FR 58101 - Electric Reliability Organization Interpretation of Transmission Operations Reliability Standard

    Science.gov (United States)

    2011-09-20

    ....C. Cir. 2009). \\4\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC... for maintaining real and reactive power balance. \\14\\ Electric Reliability Organization Interpretation...; Order No. 753] Electric Reliability Organization Interpretation of Transmission Operations Reliability...

  5. Generation adequacy and transmission interconnection in regional electricity markets

    International Nuclear Information System (INIS)

    Cepeda, Mauricio; Saguan, Marcelo; Finon, Dominique; Pignon, Virginie

    2009-01-01

    The power system capacity adequacy has public good features that cannot be entirely solved by electricity markets. Regulatory intervention is then necessary and established methods have been used to assess adequacy and help regulators to fix this market failure. In regional electricity markets, transmission interconnections play an important role in contributing to adequacy. However, the adequacy problem and related policy are typically considered at a national level. This paper presents a simple model to study how the interconnection capacity interacts with generation adequacy. First results indicate that increasing interconnection capacity between systems improves adequacy up to a certain level; further increases do not procure additional adequacy improvements. Furthermore, besides adequacy improvement, increasing transmission capacity under asymmetric adequacy criteria or national system characteristics could create several concerns about externalities. These results imply that regional coordination of national adequacy policies is essential to internalise adequacy of cross-border effects.

  6. On the Path to SunShot - Emerging Issues and Challenges in Integrating High Levels of Solar into the Electrical Generation and Transmission System

    Energy Technology Data Exchange (ETDEWEB)

    Denholm, Paul [National Renewable Energy Lab. (NREL), Golden, CO (United States); Clark, Kara [National Renewable Energy Lab. (NREL), Golden, CO (United States); O' Connell, Matt [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-05-01

    Increasing the use of grid-flexibility options (improved grid management, demand response, and energy storage) could enable 25% or higher penetration of PV at low costs (see Denholm et al. 2016). Considering the large-scale integration of solar into electric-power systems complicates the calculation of the value of solar. In fact a comprehensive examination reveals that the value of solar technologies—or any other power-system technology or operating strategy—can only be understood in the context of the generation system as a whole. This is well illustrated by analysis of curtailment at high PV penetrations within the bulk power and transmission systems. As the deployment of PV increases, it is possible that during some sunny midday periods due to limited flexibility of conventional generators, system operators would need to reduce (curtail) PV output in order to maintain the crucial balance between electric supply and demand. As a result, PV’s value and cost competitiveness would degrade. For example, for utility-scale PV with a baseline SunShot LCOE of 6¢/kWh, increasing the annual energy demand met by solar energy from 10% to 20% would increase the marginal LCOE of PV from 6¢/kWh to almost 11¢/kWh in a California grid system with limited flexibility. However, this loss of value could be stemmed by increasing system flexibility via enhanced control of variable-generation resources, added energy storage, and the ability to motivate more electricity consumers to shift consumption to lower-demand periods. The combination of these measures would minimize solar curtailment and keep PV cost-competitive at penetrations at least as high as 25%. Efficient deployment of the grid-flexibility options needed to maintain solar’s value will require various innovations, from the development of communication, control, and energy storage technologies to the implementation of new market rules and operating procedures.

  7. Is an inefficient transmission market better than none at all? On zonal and nodal pricing in electricity systems

    Energy Technology Data Exchange (ETDEWEB)

    Bertsch, Joachim

    2015-09-15

    In this paper, the trade-off between inefficient transmission forward markets (in nodal pricing regimes) and the inefficiency induced by hiding transmission constraints from the market (in zonal pricing regimes) is analyzed. First, a simple two node model formalizing the general trade-off is developed. Then, comparative statics are performed with a stochastic equilibrium model including more nodes, loop flows and an energy and transmission forward market. Inefficiency in the transmission forward market is introduced via a bid-ask-spread and risk aversion of market participants. The welfare impacts for a broad range of supply, demand, grid and inefficiency parameters are analyzed numerically. For efficient spot and forward markets, the results of the literature of nodal pricing being the efficient benchmark are confirmed. With inefficient transmission forward markets, however, zonal pricing proves advantageous in situations with little congestion and low costs. The results imply that the trade-off between the pricing regimes should be considered carefully when defining the geographical scope of bidding zones.

  8. Electric power transmission for a Hanford Nuclear Energy Center (HNEC)

    International Nuclear Information System (INIS)

    Harty, H.; Dowis, W.J.

    1983-06-01

    The original study of transmission for a Hanford Nuclear Energy Center (HNEC), which was completed in September 1975, was updated in June 1978. The present 1983 revision takes cognizance of recent changes in the electric power situation of the PNW with respect to: (1) forecasts of load growth, (2) the feasibility of early use of 1100 kV transmission, and (3) the narrowing opportunities for siting nuclear plants in the region. The purpose of this update is to explore and describe additions to the existing transmission system that would be necessary to accommodate three levels of generation at HNEC. Comparisons with a PNW system having new thermal generating capacity distributed throughout the marketing region are not made as was done in earlier versions

  9. On the Path to SunShot. Emerging Issues and Challenges in Integrating High Levels of Solar into the Electrical Generation and Transmission System

    Energy Technology Data Exchange (ETDEWEB)

    Denholm, Paul [National Renewable Energy Lab. (NREL), Golden, CO (United States); Clark, Kara [National Renewable Energy Lab. (NREL), Golden, CO (United States); O' Connell, Matt [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-05-01

    This report examines how the bulk power system may need to evolve to accommodate the increased photovoltaic (PV) penetration resulting from achievement of the U.S. Department of Energy's SunShot cost targets. The variable and uncertain nature of PV-generated electricity presents grid-integration challenges. For example, the changing net load associated with high midday PV generation and low electricity demand can create 'overgeneration' that requires curtailment of PV output and reduces PV's value and cost-competitiveness. Accommodating the changes in net load resulting from increased variable generation requires enhancements to a power system's 'flexibility,' or ability to balance supply and demand over multiple time scales through options including changes in system operation, flexible generation, reserves from solar, demand response, energy storage, and enhanced transmission and regional coordination. For utility-scale PV with a baseline SunShot levelized cost of electricity (LCOE) of 6 cents/kWh, increasing the annual energy demand met by solar energy from 10% to 20% would increase the marginal LCOE of PV from 6 cents/kWh to almost 11 cents/kWh in a California grid system with limited flexibility. However, increasing system flexibility could minimize solar curtailment and keep PV cost-competitive at penetrations at least as high as 25%. In the longer term, energy storage technologies--such as concentrating solar power with thermal energy storage--could facilitate the cost-effective integration of even higher PV penetration. Efficient deployment of the grid-flexibility options needed to maintain solar's value will require various innovations, from the development of communication, control, and energy storage technologies to the implementation of new market rules and operating procedures.

  10. Short-term electric power demand forecasting based on economic-electricity transmission model

    Science.gov (United States)

    Li, Wenfeng; Bai, Hongkun; Liu, Wei; Liu, Yongmin; Wang, Yubin Mao; Wang, Jiangbo; He, Dandan

    2018-04-01

    Short-term electricity demand forecasting is the basic work to ensure safe operation of the power system. In this paper, a practical economic electricity transmission model (EETM) is built. With the intelligent adaptive modeling capabilities of Prognoz Platform 7.2, the econometric model consists of three industrial added value and income levels is firstly built, the electricity demand transmission model is also built. By multiple regression, moving averages and seasonal decomposition, the problem of multiple correlations between variables is effectively overcome in EETM. The validity of EETM is proved by comparison with the actual value of Henan Province. Finally, EETM model is used to forecast the electricity consumption of the 1-4 quarter of 2018.

  11. Optimal transmission planning under the Mexican new electricity market

    International Nuclear Information System (INIS)

    Zenón, Eric; Rosellón, Juan

    2017-01-01

    This paper addresses electricity transmission planning under the new industry and institutional structure of the Mexican electricity market, which has engaged in a deep reform process after decades of a state-owned-vertically-integrated-non-competitive-closed industry. Under this new structure, characterized by a nodal pricing system and an independent system operator (ISO), we analyze welfare-optimal network expansion with two modeling strategies. In a first model, we propose the use of an incentive price-cap mechanism to promote the expansion of Mexican networks. In a second model, we study centrally-planned grid expansion in Mexico by an ISO within a power-flow model. We carry out comparisons of these models which provide us with hints to evaluate the actual transmission planning process proposed by Mexican authorities (PRODESEN). We obtain that the PRODESEN plan appears to be a convergent welfare-optimal planning process. - Highlights: • We model transmission planning (PRODESEN) in the Mexican new electricity market. • We propose a first model with a price-cap mechanism to promote network expansion. • In a second power-flow model, we study centrally-planned grid expansions. • The PRODESEN appears to be a convergent welfare-optimal planning process. • Incentive regulation could further help to implement such an optimal process.

  12. Eco-design of power transmissions systems

    International Nuclear Information System (INIS)

    Wang, W.

    2011-01-01

    The demand to preserve the environment and form a sustainable development is greatly increasing in the recent decades all over the world, and this environmental concern is also merged in electrical power industry, resulting in many eco-design approaches in Transmission and Distribution (T and D) industries. As a method of eco-design, Life Cycle Assessment (LCA) is a systematic tool that enables the assessment of the environmental impacts of a product or service throughout its entire life cycle, i.e. raw material production, manufacture, distribution, use and disposal including all intervening transportation steps necessary or caused by the product's existence. In T and D industries, LCA has been done for a lot of products individually, in order to see one product's environmental impacts and to seek for ways of improving its environmental performance. This eco-design for product approach is a rather well-developed trend, however, as only a single electrical product cannot provide the electrical power to users, electrical system consists of a huge number of components, in order to investigate system's environmental profile, the entire environmental profiles of different composing products has to be integrated systematically, that is to say, a system approach is needed. Under this philosophy, the study 'Eco-design of Power Transmission Systems' is conducted in this thesis, with the purpose of analysing the transmission systems' environmental impacts, locating the major environmental burden sources of transmission systems, selecting and/or developing methodologies of reducing its environmental impacts. (author)

  13. Medium-term electric power demand forecasting based on economic-electricity transmission model

    Science.gov (United States)

    Li, Wenfeng; Bao, Fangmin; Bai, Hongkun; Liu, Wei; Liu, Yongmin; Mao, Yubin; Wang, Jiangbo; Liu, Junhui

    2018-06-01

    Electric demand forecasting is a basic work to ensure the safe operation of power system. Based on the theories of experimental economics and econometrics, this paper introduces Prognoz Platform 7.2 intelligent adaptive modeling platform, and constructs the economic electricity transmission model that considers the economic development scenarios and the dynamic adjustment of industrial structure to predict the region's annual electricity demand, and the accurate prediction of the whole society's electricity consumption is realized. Firstly, based on the theories of experimental economics and econometrics, this dissertation attempts to find the economic indicator variables that drive the most economical growth of electricity consumption and availability, and build an annual regional macroeconomic forecast model that takes into account the dynamic adjustment of industrial structure. Secondly, it innovatively put forward the economic electricity directed conduction theory and constructed the economic power transfer function to realize the group forecast of the primary industry + rural residents living electricity consumption, urban residents living electricity, the second industry electricity consumption, the tertiary industry electricity consumption; By comparing with the actual value of economy and electricity in Henan province in 2016, the validity of EETM model is proved, and the electricity consumption of the whole province from 2017 to 2018 is predicted finally.

  14. Powertrain system for a hybrid electric vehicle

    Science.gov (United States)

    Reed, Jr., Richard G.; Boberg, Evan S.; Lawrie, Robert E.; Castaing, Francois J.

    1999-08-31

    A hybrid electric powertrain system is provided including an electric motor/generator drivingly engaged with the drive shaft of a transmission. The electric is utilized for synchronizing the rotation of the drive shaft with the driven shaft during gear shift operations. In addition, a mild hybrid concept is provided which utilizes a smaller electric motor than typical hybrid powertrain systems. Because the electric motor is drivingly engaged with the drive shaft of the transmission, the electric motor/generator is driven at high speed even when the vehicle speed is low so that the electric motor/generator provides more efficient regeneration.

  15. Powertrain system for a hybrid electric vehicle

    Science.gov (United States)

    Reed, R.G. Jr.; Boberg, E.S.; Lawrie, R.E.; Castaing, F.J.

    1999-08-31

    A hybrid electric powertrain system is provided including an electric motor/generator drivingly engaged with the drive shaft of a transmission. The electric is utilized for synchronizing the rotation of the drive shaft with the driven shaft during gear shift operations. In addition, a mild hybrid concept is provided which utilizes a smaller electric motor than typical hybrid powertrain systems. Because the electric motor is drivingly engaged with the drive shaft of the transmission, the electric motor/generator is driven at high speed even when the vehicle speed is low so that the electric motor/generator provides more efficient regeneration. 34 figs.

  16. Information management system for the analysis of the program of electric power transmission construction; Sistema gerencial de informacao para analise do programa de obras de transmissao

    Energy Technology Data Exchange (ETDEWEB)

    Peres, Luiz A. Pecorelli; Lima Junior, Moacir P.; Kayat, Julio; Berer, Ricardo; Sondermann, Luiz O. [FURNAS, Rio de Janeiro, RJ (Brazil)

    1993-12-31

    The management of an implementation and coordination program for electric power transmission lines construction needs to have access to up to date information in several areas. Aiming to attend these basic requisites a data base computer program was developed. This work describes such program 7 refs., 4 figs.

  17. Experimental results of wind powered pumping plant with electrical transmission

    International Nuclear Information System (INIS)

    Falchetta, M.; Prischich, D.; Benedetti, A.; Cara, G.

    1992-01-01

    A demonstrative application of deep well pumping system employing a wind powered pumping plant with an electric transmission was set-up and tested for two years at the test field of the Casaccia center of ENEA (Italian Agency for Energy, New Technologies and the Environment), near Rome. The tests permitted the evaluation of the practical performance, advantages and drawbacks of a wind pumping plant of this type, in order to permit a design optimization and a proper choice of components and of control strategies for future commercial applications. The main point of investigation was the evaluation of the effectiveness of a control scheme based on a 'permanent link' between electric generator and electric motor, avoiding any electronics and switching components, and leading to a very robust and reliable means of transferring energy to the pump at variable speed, and at low cost

  18. An incentive mechanism for electricity transmission expansion in Mexico

    International Nuclear Information System (INIS)

    Rosellon, Juan

    2007-01-01

    This study proposes an incentive regulatory framework for expanding electricity transmission in Mexico. A two-part pricing model is implemented within a combined merchant-regulatory structure. Three cases are considered. In the first, a monopolist with 'postage stamp tariffs' serves the whole country using uniform prices. In the second case, one firm holds a regional monopoly in each of the five electricity areas. In the third, a monopolist operates in all areas of the national electricity system and discriminates in the prices it charges in each of the regions. This approach is described and then applied to the Mexican electricity transmission network. Using real data, the study compares all three cases in terms of profits, capacity increases, and network expansion. The results are found to depend on two effects: the 'economies-of-scale effect', in which the maximum level is reached with a single network; and the 'discriminatory effect' that results when a firm can discriminate among types of consumers. The economies-of-scale effect produces greater capacity and network expansion, whereas the discriminatory effect increases profits

  19. An incentive mechanism for electricity transmission expansion in Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Rosellon, Juan [Division de Economia, Centro de Investigacion y Docencia Economicas (CIDE), Carret. Mexico-Toluca 3655, Lomas de Santa Fe, C.P. 01210, Mexico DF (Mexico)

    2007-05-15

    This study proposes an incentive regulatory framework for expanding electricity transmission in Mexico. A two-part pricing model is implemented within a combined merchant-regulatory structure. Three cases are considered. In the first, a monopolist with ''postage stamp tariffs'' serves the whole country using uniform prices. In the second case, one firm holds a regional monopoly in each of the five electricity areas. In the third, a monopolist operates in all areas of the national electricity system and discriminates in the prices it charges in each of the regions. This approach is described and then applied to the Mexican electricity transmission network. Using real data, the study compares all three cases in terms of profits, capacity increases, and network expansion. The results are found to depend on two effects: the ''economies-of-scale effect'', in which the maximum level is reached with a single network; and the ''discriminatory effect'' that results when a firm can discriminate among types of consumers. The economies-of-scale effect produces greater capacity and network expansion, whereas the discriminatory effect increases profits. (author)

  20. Preliminary assessment of the tradeoffs between the electric motor and the transmission in electric vehicles

    Science.gov (United States)

    Levi, E.

    1983-01-01

    The efficiency, weight, and cost of various propulsion system for 4-passenger electric vehicles are compared. These systems comprise the electric motor and the required speed reducing transmission to obtain the appropriate speed at the wheel. Three types of motors, dc synchronous, and squirrel-cage were considered at 6000 ycm and 24 000 rpm for a peak power of 40 kW. Two types of gearing selected were a single speed differential and a differential with a differential with a 4-speed gearbox. Only components that were readily realizable within present state-of-the-art were considered.

  1. Integrated Cost Allocation of Transmission Usage under Electricity Markets

    Directory of Open Access Journals (Sweden)

    Hermagasantos Zein

    2012-08-01

    Full Text Available Cost allocation of transmission usage on the power networks is an important issue especially in the modern electricity market mechanism. In this context, all costs that have been embedded in the transmission, embedded cost, should be covered by the transmission users. This paper follows general methods, where generators are fullyresponsible to cover the embedded cost. It proposes a method to determine the cost allocation of transmission usage based on decomposition through the superposition techinique to determine power flow contributions from an integrated base case of the results of the power flow calculations of all transactions, bilateral and nonbilateral contracts. Mathematically, the applied formulations are illustrated clearly in this paper. The proposed method has been tested with 5-bus system and the results are much different compared to a few of the published methods. This is shown by the test results on the 5 bus system. The published methods produce total power flow contributions in each line is greater than the actual. And they earn total revenues approximately 11.6% greater than the embedded cost. While on the proposed method, the power flow contribu tions are equal to the actual and the revenues are equal to the embedded cost. It shows also that the proposed method gives results as expected.

  2. Heuristic procedures for transmission planning in competitive electricity markets

    International Nuclear Information System (INIS)

    Lu, Wene; Bompard, Ettore; Napoli, Roberto; Jiang, Xiuchen

    2007-01-01

    The network structure of the power system, in an electricity market under the pool model, may have severe impacts on market performance, reducing market efficiency considerably, especially when producers bid strategically. In this context network re-enforcement plays a major role and proper strategies of transmission planning need to be devised. This paper presents, for pool-model electricity markets, two heuristic procedures to select the most effective subset of lines that would reduce the impacts on the market, from a set of predefined candidate lines and within the allowed budget for network expansion. A set of indices that account for the economic impacts of the re-enforcing of the candidate lines, both in terms of construction cost and market efficiency, are proposed and used as sensitivity indices in the heuristic procedure. The proposed methods are applied and compared with reference to an 18-bus test system. (author)

  3. Electricity market equilibrium model with resource constraint and transmission congestion

    Energy Technology Data Exchange (ETDEWEB)

    Gao, F. [ABB, Inc., Santa Clara, CA 95050 (United States); Sheble, G.B. [Portland State University, Portland, OR 97207 (United States)

    2010-01-15

    Electricity market equilibrium model not only helps Independent System Operator/Regulator analyze market performance and market power, but also provides Market Participants the ability to build optimal bidding strategies based on Microeconomics analysis. Supply Function Equilibrium (SFE) is attractive compared to traditional models and many efforts have been made on it before. However, most past research focused on a single-period, single-market model and did not address the fact that GENCOs hold a portfolio of assets in both electricity and fuel markets. This paper first identifies a proper SFE model, which can be applied to a multiple-period situation. Then the paper develops the equilibrium condition using discrete time optimal control considering fuel resource constraints. Finally, the paper discusses the issues of multiple equilibria caused by transmission network and shows that a transmission constrained equilibrium may exist, however the shadow price may not be zero. Additionally, an advantage from the proposed model for merchant transmission planning is discussed. (author)

  4. Electricity market equilibrium model with resource constraint and transmission congestion

    International Nuclear Information System (INIS)

    Gao, F.; Sheble, G.B.

    2010-01-01

    Electricity market equilibrium model not only helps Independent System Operator/Regulator analyze market performance and market power, but also provides Market Participants the ability to build optimal bidding strategies based on Microeconomics analysis. Supply Function Equilibrium (SFE) is attractive compared to traditional models and many efforts have been made on it before. However, most past research focused on a single-period, single-market model and did not address the fact that GENCOs hold a portfolio of assets in both electricity and fuel markets. This paper first identifies a proper SFE model, which can be applied to a multiple-period situation. Then the paper develops the equilibrium condition using discrete time optimal control considering fuel resource constraints. Finally, the paper discusses the issues of multiple equilibria caused by transmission network and shows that a transmission constrained equilibrium may exist, however the shadow price may not be zero. Additionally, an advantage from the proposed model for merchant transmission planning is discussed. (author)

  5. Integrated powertrain control for hybrid electric vehicles with electric variable transmission

    NARCIS (Netherlands)

    Kessels, J.T.B.A.; Foster, D.L.; Bosch, van den P.P.J.

    2009-01-01

    The electric variable transmission (EVT) offers a powersplit for hybrid electric vehicles by integrating two motor/ generator sets into one electric machine. This double rotor concept implements a continuously variable transmission between the engine and the driveline, including the possibility for

  6. Wireless electricity (Power) transmission using solar based power satellite technology

    International Nuclear Information System (INIS)

    Maqsood, M; Nasir, M Nauman

    2013-01-01

    In the near future due to extensive use of energy, limited supply of resources and the pollution in environment from present resources e.g. (wood, coal, fossil fuel) etc, alternative sources of energy and new ways to generate energy which are efficient, cost effective and produce minimum losses are of great concern. Wireless electricity (Power) transmission (WET) has become a focal point as research point of view and nowadays lies at top 10 future hot burning technologies that are under research these days. In this paper, we present the concept of transmitting power wirelessly to reduce transmission and distribution losses. The wired distribution losses are 70 – 75% efficient. We cannot imagine the world without electric power which is efficient, cost effective and produce minimum losses is of great concern. This paper tells us the benefits of using WET technology specially by using Solar based Power satellites (SBPS) and also focuses that how we make electric system cost effective, optimized and well organized. Moreover, attempts are made to highlight future issues so as to index some emerging solutions.

  7. Radiation transmission pipe thickness measurement system

    International Nuclear Information System (INIS)

    Higashi, Yasuhiko

    2010-01-01

    Fuji Electric Systems can be measured from the outer insulation of the transmission Characteristics and radiation detection equipment had been developed that can measure pipe wall thinning in plant and running, the recruitment of another three-beam calculation method by pipe thickness measurement system was developed to measure the thickness of the pipe side. This equipment has been possible to measure the thickness of the circumferential profile of the pipe attachment by adopting automatic rotation. (author)

  8. Electrical and Biological Effects of Transmission Lines: A Review.

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jack M.

    1989-06-01

    This review describes the electrical properties of a-c and d-c transmission lines and the resulting effects on plants, animals, and people. Methods used by BPA to mitigate undesirable effects are also discussed. Although much of the information in this review pertains to high-voltage transmission lines, information on distribution lines and electrical appliances is included. The electrical properties discussed are electric and magnetic fields and corona: first for alternating-current (a-c) lines, then for direct current (d-c).

  9. Evaluating congestion management in the Dutch electricity transmission grid

    International Nuclear Information System (INIS)

    Blijswijk, Martti J. van; Vries, Laurens J. de

    2012-01-01

    Due to the increase in electricity generation capacity in the Netherlands and a new connection policy, transmission system operator (TSO) TenneT expects a significant increase in congestion in the Dutch transmission grid. To manage this, the Dutch government implemented redispatching, a method which is argued in the literature to potentially impose large congestion costs upon the TSO. A quantitative model of the Dutch electricity system was developed in order to evaluate this method. The outcomes were compared to the performance of three alternative congestion management methods. Regardless of the method, congestion costs were found to be substantially lower than in previous studies. Because combined-cycle gas turbines are the marginal generation technology in almost all cases, the costs of up and down regulation do not differ much. Consequently, the redispatching costs for the TSO are expected to be relatively low, and the opportunities for abuse of market power appear to be limited. While all the evaluated methods are effective and economically efficient, they have significantly different welfare effects. Market splitting creates significantly larger welfare effects than the different varieties of redispatching. - Highlights: ► Congestion management was recently introduced in the Netherlands. ► We quantitatively evaluate the effects of its application. ► We compare this to other congestion management methods. ► Given the specific situation that the marginal cost curve of production is flat, congestion costs are expected to be low.

  10. Transmission investment and expansion planning in a restructured electricity market

    International Nuclear Information System (INIS)

    Wu, F.F; Wen, F.S.; Zheng, F.L.

    2006-01-01

    Transmission planning in a restructured electricity market becomes increasingly complicated. To bridge the gap between economic and engineering considerations, this survey paper suggests a framework to clarify the interactions among various economic and engineering issues by reviewing recent theoretical and practical progress in transmission investment and transmission planning methodology. Thus, the paper makes economic literature more accessible to the engineering community and engineering literature more accessible to the economic community interested in the subject. (author)

  11. Estimation of charges for services of transmission of electrical energy between regions of the national electrical system; Estimacion de cargos por servicios de transmision de energia electrica entre regiones del sistema electrico nacional

    Energy Technology Data Exchange (ETDEWEB)

    Inda Ruiz, Adrian; Flores Alba, Dora Elia [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Escobar Lopez, Akihito [Comision Federal de Electricidad (Mexico)

    2002-07-01

    In order to facilitate the answer of the Comision Federal de Electricidad (CFE) to the requests of services of transmission of authorized or potential licensees, this organism devised the construction of matrices of charges that allow in a fast and direct way for specific transactions, to know the charges in which different types of transmission services incur classified by transport levels and by tension levels in which the service is asked for. These tables could be published in the media that might be judged advisable, in order that the applicant licensees have access to a preliminary estimation of the charges for the required services, without the need of going, for one first estimation, directly to the CFE for their calculation. This article presents the results of the development of a calculation tool that allows estimating, in a fast and efficient way, charges for transmission services between regions of the national electrical system. [Spanish] Para facilitar la respuesta de la Comision Federal de Electricidad (CFE) a las solicitudes de servicios de transmision de permisionarios autorizados o potenciales, esta ideo la construccion de matrices de cargos que permitan de manera rapida y directa para transacciones especificas, conocer los cargos en que incurren diferentes tipos de servicios de transmision clasificados por niveles de transporte y por niveles de tension en los que se solicita el servicio. Dichas tablas podran ser publicadas en los medios que se juzguen convenientes, con el fin de que los permisionarios solicitantes tengan acceso a una estimacion preliminar de los cargos por los servicios requeridos, sin necesidad de acudir, para una primera estimacion, directamente a la CFE para su calculo. Este articulo presenta los resultados del desarrollo de una herramienta de calculo que permite estimar, de manera rapida y eficiente, matrices de cargos por servicios de transmision entre regiones del sistema electrico nacional.

  12. The paradox of transmission system value

    International Nuclear Information System (INIS)

    Haddad, S.Z.; Feldman, R.D.; Charnetzki, P.

    1995-01-01

    The central importance of utility strategic planning with respect to transmission systems has developed as a result of the passage of the Energy Policy Act and the rapid emergence of the era of open grid access. As a consequence, utilities have had to redefine transmission as being more than a cost center managed with reliability as the principal focus and regulated on a rate of return basis. Transmission must now be managed with a view to protection of customers, where possible, and to revenue maximization, both through pricing strategy and through operations. This shift has been compounded by the pressures being thrust upon utilities by regulators or being fomented by competitors to unbundle transmission and distribution from generation. This paper explores how the value of the transmission system can be viewed from the vantage points of different organizations (utilities, regulators, customers, independent generators, etc.). The paper addresses the uncertain and apparently paradoxical nature of transmission system value as it will be impacted by the possible alternative future structures of the electric power industry. Lastly, this paper suggests the strategic possibilities for utilities that this uncertainty presents

  13. Investment in electricity networks with transmission switching

    DEFF Research Database (Denmark)

    Villumsen, Jonas Christoffer; Philpott, A.B.

    2012-01-01

    allows the solution of large problem instances. The methodology is illustrated by its application to a problem of determining the optimal investment in switching equipment and transmission capacity for an existing network. Computational tests on IEEE test networks with 73 nodes and 118 nodes confirm...

  14. Topics in lightwave transmission systems

    CERN Document Server

    Li, Tingye

    1991-01-01

    Topics in Lightwave Transmission Systems is a second volume of a treatise on optical fiber communications that is devoted to the science, engineering, and application of information transmission via optical fibers. The first volume, published in 1985, dealt exclusively with fiber fabrication. The present volume contains topics that pertain to subsystems and systems. The book contains five chapters and begins with discussions of transmitters and receivers, which are basic to systems now operating in the field. Subsequent chapters cover topics relating to coherent systems: frequency and phase m

  15. Environmental concerns regarding electric power transmission in North America

    International Nuclear Information System (INIS)

    DeCicco, J.M.; Bernow, S.S.; Beyea, J.

    1992-01-01

    The electric utilities of North America have become ever more interconnected via transmission facilities, largely to insure reliability. Current policy discussions regarding transmission include calls for improved access, increased capacity, and deregulation to facilitate trade in electric power. From an environmental perspective, two issues have been notably absent in much of the debate: (1) a recognition of the full range of environmental impacts related to electricity transmission; and (2) the potential for end-use efficiency to address the reliability and economy requirements that motivate attention to transmission. This paper broaches these issues, starting with an elaboration of the environmental impacts, which range from global and regional effects to local concerns, including the potential health risks associated with electric and magnetic fields. We emphasize that transmission planning should occur as part of an integrated planning process, in which the environmental and social costs of various options are fully considered. We discuss the potential for end-use efficiency to lessen environmental impacts of both transmission and generation. We conclude that there is a need to ensure that environmental externalities and demand-side alternatives are adequately considered when transmission network expansions are proposed. (Author)

  16. Transmission-constrained oligopoly in the Japanese electricity market

    International Nuclear Information System (INIS)

    Tanaka, Makoto

    2009-01-01

    We simulate the Japanese wholesale electricity market as a transmission-constrained Cournot market using a linear complementarity approach. First, we investigate the effects of upgrading the bottleneck transmission line between the eastern and western regions, focusing on the mitigation of transmission congestion. Although increasing the bottleneck capacity would lead to welfare gains, they might not be substantial particularly when transmission capacity costs are taken into account. Second, we examine the effects of splitting the largest electric power company, which is located in the eastern region, focusing on the mitigation of market power. Splitting the largest company into two companies would lead to a 25% reduction in the eastern price, and a 50% reduction in deadweight loss. The divestiture of the largest company would have a significant effect of mitigating market power in the Japanese electricity market. (author)

  17. Advanced continuously variable transmissions for electric and hybrid vehicles

    Science.gov (United States)

    Loewenthal, S. H.

    1980-01-01

    A brief survey of past and present continuously variable transmissions (CVT) which are potentially suitable for application with electric and hybrid vehicles is presented. Discussion of general transmission requirements and benefits attainable with a CVT for electric vehicle use is given. The arrangement and function of several specific CVT concepts are cited along with their current development status. Lastly, the results of preliminary design studies conducted under a NASA contract for DOE on four CVT concepts for use in advanced electric vehicles are reviewed.

  18. THE MAIN DIRECTIONS OF IMPROVING THE EFFICIENCY OF PRODUCTION, TRANSMISSION AND DISTRIBUTION OF ELECTRICAL ENERGY

    Directory of Open Access Journals (Sweden)

    I. V. Zhezhelenko

    2018-01-01

    Full Text Available The main directions of increase of efficiency of production, transmission and distribution of electric energy have been formulated. The relation between the values of electricity losses during transmission via power grids of different countries and the level of the economies of these countries characterized by the value of gross domestic product at purchasing power parity per capita has been established. In the countries with a gross domestic product at purchasing power parity per capita less than 20 thousand US dollars electricity losses during its transmission via power grids are 1.5–2.5 times more than the ones transmitted via power grids of the industrialized countries where the specified purchasing power parity is in the range of 30.4–54.5 thousand US dollars. In the countries with more developed economies the technical culture of production, transmission and distribution of electricity is higher; the modern control systems of operation modes of electrical networks are used as well as of monitoring and accounting of electricity; also there are solvent and disciplined consumers in such countries as well as clear regulatory framework and tariff regulation system. However, the process of transmission and distribution of electricity is effective if not only low relative losses take place, but the normal (contractual requirements for carrying capacity, quality and reliability of electricity supply are provided. The possibility of analytical determination of the optimum value of reserve capacity of power plants providing the required level of reliability of the power system has been considered.

  19. 78 FR 44900 - Communication of Operational Information Between Natural Gas Pipelines and Electric Transmission...

    Science.gov (United States)

    2013-07-25

    ... Regional Transmission Organizations and Independent System Operators (RTOs/ISOs) also noted that, although... operator from discussions between RTOs/ ISOs and natural gas pipelines regarding the status of a generator... not customers of electric transmission operators. Likewise, in the case of RTOs/ISOs, they are not...

  20. Grounding modelling for transient overvoltage simulation in electric power transmission

    International Nuclear Information System (INIS)

    Moreno O, German; Valencia V, Jaime A; Villada, Fernando

    1992-01-01

    Grounding plays an important role in transmission line outages and consequently on electric energy transmission quality indexes. Fundamentals of an accurate modelling for transient behaviour analysis, particularly for the response of transmission lines to lightning, are presented. Also, a method to take into account the electromagnetic propagation guided by the grounding electrodes and finally to assess the grounding impedance in order to simulate the transmission line behaviour under lightning is presented. Analysis of impedance behaviour for diverse configurations and simulation results of over voltages on a real 220 kV line are presented to illustrate the capabilities of the method and of the computational program developed

  1. Transmission pricing and stranded costs in the electric power industry

    International Nuclear Information System (INIS)

    Baumol, W.J.; Sidak, J.G.

    1995-09-01

    Stranded costs are those costs that electric utilities are currently permitted to recover through their rates but whose recovery may be impeded or prevented by the advent of competition in the industry. Estimates of these costs run from the tens to the hundreds of billions of dollars. Should regulators permit utilities to recover stranded costs while they take steps to promote competition in the electric power industry. William Baumol and J. Gregory Sidak argue that answer to that question should be yes.The authors show that a transmission price, the price for sending electricity over the transmission grid, can be determined in a manner that is compatible with economic efficiency and clearly neutral in its effects upon all competitors in electricity generation. A correctly constructed regime of transmission pricing may in fact achieve the efficiency and equity goals that justify the recovery of stranded costs

  2. Incorporating energy efficiency into electric power transmission planning: A western United States case study

    International Nuclear Information System (INIS)

    Barbose, Galen L.; Sanstad, Alan H.; Goldman, Charles A.

    2014-01-01

    Driven by system reliability goals and the need to integrate significantly increased renewable power generation, long-range, bulk-power transmission planning processes in the United States are undergoing major changes. At the same time, energy efficiency is an increasing share of the electricity resource mix in many regions, and has become a centerpiece of many utility resource plans and state policies as a means of meeting electricity demand, complementing supply-side sources, and reducing carbon dioxide emissions from the electric power system. The paper describes an innovative project in the western United States to explicitly incorporate end-use efficiency into load forecasts – projections of electricity consumption and demand – that are a critical input into transmission planning and transmission planning studies. Institutional and regulatory background and context are reviewed, along with a detailed discussion of data sources and analytical procedures used to integrate efficiency into load forecasts. The analysis is intended as a practical example to illustrate the kinds of technical and institutional issues that must be addressed in order to incorporate energy efficiency into regional transmission planning activities. - Highlights: • Incorporating energy efficiency into electric power transmission planning is an emergent analytical and policy priority. • A new methodology for this purpose was developed and applied in the western U.S. transmission system. • Efficiency scenarios were created and incorporated into multiple load forecasts. • Aggressive deployment of efficiency policies and programs can significantly reduce projected load. • The approach is broadly applicable in long-range transmission planning

  3. Transmission capacities and competition in Western European electricity market

    International Nuclear Information System (INIS)

    Spiridonova, Olga

    2016-01-01

    The integration of national electricity markets into a single European one is expected to reduce the ability of dominant players to exercise market power. This paper investigates whether or not existing transmission capacities of cross-border interconnectors are sufficient to achieve this result and create vigorous competition in the market. A model with two decision levels is used. On the first level profit maximizing generators play Cournot game against each other. On the last level the system operator clears the market and determines flows in the network to maximize social welfare subject to a set of physical constraints. As each strategic generator anticipates her impact on equilibrium prices and congestion in the system, her optimization problem is subject to equilibrium constraints from the system operator's problem. The analysis demonstrates that interconnector capacities in Western Europe are insufficient for integration alone to reduce the exercise of market power. I compare several possible competition-enhancing policies: expansion of interconnectors and different scenarios of national markets’ restructuring. I show that although increase of line capacity is a useful tool to stimulate competition in an integrated market, it is not a substitute for the restructuring of large players. - Highlights: •The ability of integration to reduce market power depends on transmission capacities. •In the model firms compete in quantities, know their impact on prices and congestion. •In Western Europe integration will not diminish market power. •Line extension stimulates competition but is not a substitute for the regulation.

  4. Unbundling generation and transmission services for competitive electricity markets

    International Nuclear Information System (INIS)

    Hirst, E.; Kirby, B.

    1998-01-01

    Ancillary services are those functions performed by the equipment and people that generate, control, and transmit electricity in support of the basic services of generating capacity, energy supply, and power delivery. The Federal Energy Regulatory Commission (FERC) defined such services as those 'necessary to support the transmission of electric power from seller to purchaser given the obligations of control areas and transmitting utilities within those control areas to maintain reliable operations of the interconnected transmission system.' The nationwide cost of ancillary services is about $12 billion a year, roughly 10% of the cost of the energy commodity. More important than the cost, however, is the necessity of these services for bulk-power reliability and for the support of commercial transactions. FERC's landmark Order 888 included a pro forma tariff with provision for six key ancillary services. The Interconnected Operations Services Working Group identified another six services that it felt were essential to the operation of bulk-power systems. Several groups throughput the United States have created or are forming independent system operators, which will be responsible for reliability and commerce. To date, the electricity industry (including traditional vertically integrated utilities, distribution utilities, power markets and brokers, customers, and state and federal regulators) has paid insufficient attention to these services. Although the industry had made substantial progress in identifying and defining the key services, much remains to be doe to specify methods to measure the production, delivery, and consumption of these services; to identify the costs and cost-allocation factors for these services; and to develop market and operating rules for their provision and pricing. Developing metrics, determining costs, and setting pricing rules are important because most of these ancillary services are produced by the same pieces of equipment that

  5. Pervasive Electricity Distribution System

    Directory of Open Access Journals (Sweden)

    Muhammad Usman Tahir

    2017-06-01

    Full Text Available Now a days a country cannot become economically strong until and unless it has enough electrical power to fulfil industrial and domestic needs. Electrical power being the pillar of any country’s economy, needs to be used in an efficient way. The same step is taken here by proposing a new system for energy distribution from substation to consumer houses, also it monitors the consumer consumption and record data. Unlike traditional manual Electrical systems, pervasive electricity distribution system (PEDS introduces a fresh perspective to monitor the feeder line status at distribution and consumer level. In this system an effort is taken to address the issues of electricity theft, manual billing, online monitoring of electrical distribution system and automatic control of electrical distribution points. The project is designed using microcontroller and different sensors, its GUI is designed in Labview software.

  6. The year in review: Electric transmission

    International Nuclear Information System (INIS)

    Hebert, C. Jr.

    1999-01-01

    This writing and the comments contained herein support the conclusion that mandating a solution to transmission woes is not the proper choice. Even if it were the right choice, it would not be the way to go. FERC exists in a sophisticated energy world and must comprehend that without the help of the energy industry it is doomed to fail. Technology changes, economies change, and even the FERC itself changes, and will again. This is all part of the energy journey. RTOs, pools, ISOs, RTOs, and, yes, Transcos are a part of the evolution of energy regulation and perhaps deregulation to some degree

  7. Electrical power systems for Mars

    Science.gov (United States)

    Giudici, Robert J.

    1986-01-01

    Electrical power system options for Mars Manned Modules and Mars Surface Bases were evaluated for both near-term and advanced performance potential. The power system options investigated for the Mission Modules include photovoltaics, solar thermal, nuclear reactor, and isotope power systems. Options discussed for Mars Bases include the above options with the addition of a brief discussion of open loop energy conversion of Mars resources, including utilization of wind, subsurface thermal gradients, and super oxides. Electrical power requirements for Mission Modules were estimated for three basic approaches: as a function of crew size; as a function of electric propulsion; and as a function of transmission of power from an orbiter to the surface of Mars via laser or radio frequency. Mars Base power requirements were assumed to be determined by production facilities that make resources available for follow-on missions leading to the establishment of a permanently manned Base. Requirements include the production of buffer gas and propellant production plants.

  8. Impacts of Demand-Side Resources on Electric Transmission Planning

    Energy Technology Data Exchange (ETDEWEB)

    Hadley, Stanton W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sanstad, Alan H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-01-01

    Will demand resources such as energy efficiency (EE), demand response (DR), and distributed generation (DG) have an impact on electricity transmission requirements? Five drivers for transmission expansion are discussed: interconnection, reliability, economics, replacement, and policy. With that background, we review the results of a set of transmission studies that were conducted between 2010 and 2013 by electricity regulators, industry representatives, and other stakeholders in the three physical interconnections within the United States. These broad-based studies were funded by the US Department of Energy and included scenarios of reduced load growth due to EE, DR, and DG. While the studies were independent and used different modeling tools and interconnect-specific assumptions, all provided valuable results and insights. However, some caveats exist. Demand resources were evaluated in conjunction with other factors, and limitations on transmission additions between scenarios made understanding the role of demand resources difficult. One study, the western study, included analyses over both 10- and 20-year planning horizons; the 10-year analysis did not show near-term reductions in transmission, but the 20-year indicated fewer transmission additions, yielding a 36percent capital cost reduction. In the eastern study the reductions in demand largely led to reductions in local generation capacity and an increased opportunity for low-cost and renewable generation to export to other regions. The Texas study evaluated generation changes due to demand, and is in the process of examining demand resource impacts on transmission.

  9. Proximity effects of high voltage electric power transmission lines on ...

    African Journals Online (AJOL)

    The proximity effects of high voltage electric power transmission lines on Leyland Cypress (xCupressocyparis leylandii (Dallim. and A.B. Jacks.) Dallim) and Japanese Privet (Ligustrum japonicum Thunb.) growth were examined in a private nursery located in Sakarya, Turkey. Five transect were randomly chosen in both ...

  10. In situ Electrical measurements in Transmission Electron Microscopy

    NARCIS (Netherlands)

    Rudneva, M.

    2013-01-01

    In the present thesis the combination of real-time electricalmeasurements on nano-sampleswith simultaneous examination by transmission electron microscope (TEM) is discussed. Application of an electrical current may lead to changes in the samples thus the possibility to correlate such changes with

  11. Electrical system architecture

    Science.gov (United States)

    Algrain, Marcelo C [Peoria, IL; Johnson, Kris W [Washington, IL; Akasam, Sivaprasad [Peoria, IL; Hoff, Brian D [East Peoria, IL

    2008-07-15

    An electrical system for a vehicle includes a first power source generating a first voltage level, the first power source being in electrical communication with a first bus. A second power source generates a second voltage level greater than the first voltage level, the second power source being in electrical communication with a second bus. A starter generator may be configured to provide power to at least one of the first bus and the second bus, and at least one additional power source may be configured to provide power to at least one of the first bus and the second bus. The electrical system also includes at least one power consumer in electrical communication with the first bus and at least one power consumer in electrical communication with the second bus.

  12. Electric Utility Transmission and Distribution Line Engineering Program

    Energy Technology Data Exchange (ETDEWEB)

    Peter McKenny

    2010-08-31

    Economic development in the United States depends on a reliable and affordable power supply. The nation will need well educated engineers to design a modern, safe, secure, and reliable power grid for our future needs. An anticipated shortage of qualified engineers has caused considerable concern in many professional circles, and various steps are being taken nationwide to alleviate the potential shortage and ensure the North American power system's reliability, and our world-wide economic competitiveness. To help provide a well-educated and trained workforce which can sustain and modernize the nation's power grid, Gonzaga University's School of Engineering and Applied Science has established a five-course (15-credit hour) Certificate Program in Transmission and Distribution (T&D) Engineering. The program has been specifically designed to provide working utility engineering professionals with on-line access to advanced engineering courses which cover modern design practice with an industry-focused theoretical foundation. A total of twelve courses have been developed to-date and students may select any five in their area of interest for the T&D Certificate. As each course is developed and taught by a team of experienced engineers (from public and private utilities, consultants, and industry suppliers), students are provided a unique opportunity to interact directly with different industry experts over the eight weeks of each course. Course material incorporates advanced aspects of civil, electrical, and mechanical engineering disciplines that apply to power system design and are appropriate for graduate engineers. As such, target students for the certificate program include: (1) recent graduates with a Bachelor of Science Degree in an engineering field (civil, mechanical, electrical, etc.); (2) senior engineers moving from other fields to the utility industry (i.e. paper industry to utility engineering or project management positions); and (3) regular

  13. Analysis and evaluation of hybrid scooter transmission systems

    Energy Technology Data Exchange (ETDEWEB)

    Sheu, Kuen-Bao [Department of Vehicle Engineering, National Formosa University, 64 Wunhua Road, Huwei, Yuenlin 63208 (China)

    2007-12-15

    This paper presents a new design concept of transmissions for the hybrid scooters. These transmissions consist of a one-degree-of-freedom planetary gear train and a two-degree-of-freedom planetary gear train to from a split power system and to combine the power of two power sources, a gasoline engine and an electric motor. In order to maximize the performance and reduce emissions, the transmissions can provide a hybrid scooter to run five operating modes: electric motor mode; engine mode; engine/charging mode; power mode, and regenerative braking mode. The main advantages of the transmissions proposed in this paper include the use of only one electric motor/generator, need not use clutch/brake for the shift of the operating modes, and high efficiency. The kinematics, power flow, and mechanical efficiency analyzes are performed; and according to these results, the evaluation of transmission power performances are accomplished. (author)

  14. Transmission Reinforcements in the Central American Regional Power System

    Energy Technology Data Exchange (ETDEWEB)

    Elizondo, Marcelo A.; Vallem, Mallikarjuna R.; Samaan, Nader A.; Makarov, Yuri V.; Vyakaranam, Bharat; Nguyen, Tony B.; Munoz, Christian; Herrera, Ricardo; Midence, Diego; Shpitsberg, Anna

    2016-07-25

    The Central American regional interconnected power system (SER) connects the countries members of the Central American regional electricity market (MER): Guatemala, El Salvador, Honduras, Nicaragua, Costa Rica, and Panama. The SER was a result of a long term regional effort, and was initially conceived to transfer 300 MW between countries. However, the current transfer limits between countries range from 70 MW to 300 MW. Regional entities, like CRIE (Regional Commission of Electrical Interconnection), EOR (Central American Regional System Operator), and CDMER (Board of Directors of the Central American Market) are working on coordinating the national transmission expansion plans with regional transmission planning efforts. This paper presents experience in Central America region to recommend transmission reinforcements to achieve 300 MW transfer capacity between any pair of member countries of the Central American regional electricity market (MER). This paper also provides a methodology for technical analysis and for coordination among the regional and national entities. This methodology is unique for transmission systems of these characteristics.

  15. The Brazilian electrical system reform

    International Nuclear Information System (INIS)

    Mendonca, A.F.; Dahl, C.

    1999-01-01

    Although the Brazilian electrical system has been a public monopoly, the threat of electricity shortages from a lack of investment triggered a comprehensive reform. In 1993 the government began a series of laws, decrees and regulations reforming the tariff policy, allowing privatization of utilities, foreign investments and independent power producers, and creating an independent transmission grid and a new electricity regulatory agency (ANEEL). The new regulatory framework is not completely defined but the proposed model intends to transform bulk electricity supply into a competitive market similar to that adopted in England. Our objective is to evaluate whether the proposed reform will succeed in attracting the required private capital, will allow an unregulated wholesale electricity market and will require a strict regulatory framework. The reform has been quite successful in privatizing the distribution companies but is allowing monopolistic rents, and has failed until now to attract private investments to expand generation capacity. The risk of blackouts has increased, and the proposed wholesale electricity market may not be appropriate because of barriers to constructing new hydroelectric units, now 90% of the system. Therefore, a new regulatory framework and a strong regulatory agency with a well-defined tariff policy should have preceded the privatization. (author)

  16. Electric power transmission and distribution in Germany - an NTPA success

    International Nuclear Information System (INIS)

    Staschus, K.

    2002-01-01

    The German Energy Law of April 1998 opened 100 percent of the German electricity market to competition without any transition phase. Over four years later, the degree of market opening is still ahead of that in many other European countries. Transition phases elsewhere have been dominated by the need to develop detailed rules not only for the functioning of the power markets - e.g. in power exchanges - but also for the transmission and distribution system operators and for the data exchange between market participants. Especially the data exchange needs for the handling of household customers switching suppliers has been a challenge in all the countries that have opened the household customer market. But also the network access fees on both transmission and distribution level are still being debated in many countries. The German governments have so far chosen to let the network operators develop the access rules, pricing rules and data exchange standards in intense - and intensely observed - negotiations with the network users. Important outcomes of such negotiations include the well-known A ssociations' Agreements , GridCode, DistributionCode, MeteringCode as well as the government's Best Practice Recommendations on data exchange standards for the switching between suppliers. One important advantage of this negotiation-based rather than regulatory approach is its speed and flexibility. For example, the Associations' Agreement on network access fees is now valid in its third version, and each successive version included important learning from the experience of both network operators and network users with the previous agreement. This paper will summarise the legal framework of the liberalised power market in Germany and focus on the current state of pricing rules in the Associations' Agreement, of well advanced comparisons run by VDN, of the network access fees of hundreds of distribution system operators including specific data on structural differences of their

  17. Harmonics in transmission power systems

    DEFF Research Database (Denmark)

    Wiechowski, Wojciech Tomasz

    . The comparison shows that results obtained used both types of the cores are the same, so it is concluded that both cores can be used for harmonic measurements. Low-inductance resistors are introduced in the secondary circuits, in series with the metering and protective relaying. On those resistors, the harmonic......Some time ago, Energinet.dk, the Transmission System Operator of the 150 kV and 400 kV transmission network in Denmark, had experienced operational malfunctions of some of the measuring and protection equipment. Also an overloading of a harmonic filter has been reported, and therefore, a need...... end only so the ground is not used as a return path. A way to reduce the capacitive coupling is to provide shielding. Harmonic currents are measured using the conventional inductive voltage transformers. Both protective and metering cores were compared if they could be used for harmonic measurements...

  18. Electric distribution systems

    CERN Document Server

    Sallam, A A

    2010-01-01

    "Electricity distribution is the penultimate stage in the delivery of electricity to end users. The only book that deals with the key topics of interest to distribution system engineers, Electric Distribution Systems presents a comprehensive treatment of the subject with an emphasis on both the practical and academic points of view. Reviewing traditional and cutting-edge topics, the text is useful to practicing engineers working with utility companies and industry, undergraduate graduate and students, and faculty members who wish to increase their skills in distribution system automation and monitoring."--

  19. Shipboard electrical power systems

    CERN Document Server

    Patel, Mukund R

    2011-01-01

    Shipboard Electrical Power Systems addresses new developments in this growing field. Focused on the trend toward electrification to power commercial shipping, naval, and passenger vessels, this book helps new or experienced engineers master cutting-edge methods for power system design, control, protection, and economic use of power. Provides Basic Transferable Skills for Managing Electrical Power on Ships or on LandThis groundbreaking book is the first volume of its kind to illustrate optimization of all aspects of shipboard electrical power systems. Applying author Mukund Patel's rare combina

  20. Electric power transmission for a Hanford Nuclear Energy Center (HNEC)

    International Nuclear Information System (INIS)

    1975-09-01

    The major issues examined in the comparison of the DIST and HNEC transmission concepts are: (1) type of transmission to be employed and an assessment of its technical feasibility, (2) availability of rights-of-way, (3) economics, (4) environmental impact, and (5) overall reliability of the transmission system. The type of transmission selected for bulk power transfer from an HNEC for the time period studied is overhead AC, 500 kV double or single circuit, a voltage currently used in the PNW system. This type of system can accommodate growth up to at least 23,000 MW of thermal capacity at an HNEC. Significant additional transmountain capacity needs would require 1100 kV transmission, which should be technologically proved by the end of the 1970s. (auth)

  1. 76 FR 23222 - Electric Reliability Organization Interpretation of Transmission Operations Reliability

    Science.gov (United States)

    2011-04-26

    ....3d 1342 (DC Cir. 2009). \\5\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693... Reliability Standards for the Bulk-Power System. Action: FERC-725A. OMB Control No.: 1902-0244. Respondents...] Electric Reliability Organization Interpretation of Transmission Operations Reliability AGENCY: Federal...

  2. A universal calculation model for the controlled electric transmission line

    International Nuclear Information System (INIS)

    Zivzivadze, O.; Zivzivadze, L.

    2009-01-01

    Difficulties associated with the development of calculation models are analyzed, and the ways of resolution of these problems are given. A version of the equivalent circuit as a six-pole network, the parameters of which do not depend on the angle of shift Θ between the voltage vectors of circuits is offered. The interrelation between the parameters of the equivalent circuit and the transmission constants of the line was determined. A universal calculation model for the controlled electric transmission line was elaborated. The model allows calculating the stationary modes of lines of such classes at any angle of shift Θ between the circuits. (author)

  3. Towards an optimal transmission system

    International Nuclear Information System (INIS)

    Calviou, M.

    2005-01-01

    This presentation provided background on National Grid USA and discussed transmission investment in the United States (US) and United Kingdom. It also discussed barriers to transmission investments and improvements, thoughts on solutions and a long-term vision. The presentation identified that transmission investment should follow from clear reliability rules designed to promote better operation and management; investment does not necessarily mean new rights-of-way; and transmission investment should target benefits to customers. It was stated that US transmission investment levels have decreased. A comparison between US and UK transmission investment was presented along with a chart of increasing US congestion costs. Barriers to investment in US transmission include vertical integration; misperception of transmission as a market product; federal and state jurisdiction issues; fragmentation in transmission ownership and operation; rate cap based plans that impact transmission; lack of clarity in cost allocation; and the site selection process. Possible solutions include policy and incentives, promoting independence and resolving structural issues. tabs., figs

  4. Expansion planning for electrical generating systems

    International Nuclear Information System (INIS)

    1984-01-01

    The guidebook outlines the general principles of electric power system planning in the context of energy and economic planning in general. It describes the complexities of electric system expansion planning that are due to the time dependence of the problem and the interrelation between the main components of the electric system (generation, transmission and distribution). Load forecasting methods are discussed and the principal models currently used for electric system expansion planning presented. Technical and economic information on power plants is given. Constraints imposed on power system planning by plant characteristics (particularly nuclear power plants) are discussed, as well as factors such as transmission system development, environmental considerations, availability of manpower and financial resources that may affect the proposed plan. A bibliography supplements the references that appear in each chapter, and a comprehensive glossary defines terms used in the guidebook

  5. Transmission system planning in Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Barrie, D; Macedo, F X; Mcconnach, J S [Ontario Hydro, Toronto, ON (Canada)

    1994-12-31

    In recent years, new and modified approaches to planning the large transmission system that serves the province of Ontario, Canada, have been necessary to accommodate the rapidly changing planning environment including slower uncertain growth, ageing of facilities, integration of demand side management and non utility generation options, increased competitiveness, increased financial stresses and affordable constraints. This paper describes some of the new and modified approaches and tools that have been adopted or are being developed by Ontario Hydro to cope with this changing environment. (author) 9 refs., 4 figs.

  6. Electrical distribution system management

    International Nuclear Information System (INIS)

    Hajos, L.; Mortarulo, M.; Chang, K.; Sparks, T.

    1990-01-01

    This paper reports that maintenance of electrical system data is essential to the operation, maintenance, and modification of a nuclear station. Load and equipment changes affect equipment sizing, available short-circuit currents and protection coordination. System parameters must be maintained in a controlled manner to enable evaluation of proposed modifications and provide adequate verification and traceability. For this purpose, Public Service Electric and Gas Company has implemented a Verified and Validated Electric Distribution System Management (EDSM) program at the Hope Creek and Salem Nuclear Power Stations. EDSM program integrates computerized configuration management of electrical systems with calculational software the Technical Standard procedures. The software platform is PC-based. The Database Manager and Calculational programs have been linked together through a user friendly menu system. The database management nodule enable s assembly and maintenance of databases for individual loads, buses, and branches within the electrical systems with system access and approval controlled through electronic security incorporated within the database manger. Reports drawn from the database serve as the as-built and/or as-designed record of the system configurations. This module also creates input data files of network parameters in a format readable by the calculational modules. Calculations modules provide load flow, voltage drop, motor starting, and short-circuit analyses, as well as dynamic analyses of bus transfers

  7. Electric and magnetic field reduction by alternative transmission line options

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, J.R. (Power Technologies, Inc., Schenectady, NY (United States)); Dale, S.J. (Oak Ridge National Lab., TN (United States)); Klein, K.W. (Energetics, Inc., Columbia, MD (United States))

    1991-01-01

    Ground level electric, and more recently magnetic, fields from overhead power transmission lines are increasingly important considerations in right of way specification, with states setting or planning to set edge of right of way limits. Research has been conducted in high phase order power transmission wherein six of twelve phases are used to transmit power in less physical space and with reduced electrical environmental effects than conventional designs. The first magnetic field testing, as reported in this paper, has verified predictive methods for determination of magnetic fields from high phase order lines. Based on these analytical methods, field profiles have been determined for lines of different phase order of comparable power capacity. Potential advantages of high phase order as a means of field mitigation are discussed. 10 refs., 12 figs., 3 tabs.

  8. Alberta's new competitive electricity system

    International Nuclear Information System (INIS)

    Hancher, L.

    1996-01-01

    The shape, speed and direction of further reforms in Alberta's electric power industry were forecast, following the introduction of a competitive framework for the industry, the first province to do so in Canada, effective January 1996. This study reviews the previously existing system ( a mix of investor-owned and municipally-owned utilities), as well as the proposed new structure as laid out in the new Electric Utilities Act, based on the three principles of unbundling, a competitive power pool and open system access transmission. The paper also reviewed some of the major issues that will have to be faced in the future, such as how to deal with market power and possible collusion between the generators to hold prices down, a problem that has been the well-known failing of the U.K. pool mechanism

  9. Merchant electricity transmission expansion: A European case study

    Energy Technology Data Exchange (ETDEWEB)

    Kristiansen, T. [RBS Sempra Commodities, 155 Bishopsgate, London EC2M3TZ (United Kingdom); Rosellon, J. [Centro de Investigacion y Docencia Economicas (CIDE), Division de Economia, Carretera Mexico-Toluca 3655, Lomas de Santa Fe, 01210 Mexico D.F. (Mexico); German Institute for Economic Research (DIW Berlin), Mohrenstrasse 58, 10117, Berlin (Germany)

    2010-10-15

    We apply a merchant transmission model to the trilateral market coupling (TLC) arrangement among the Netherlands, Belgium and France as an example, and note that it could further be applied to other market splitting or coupling of Europe's different national power markets. In this merchant framework the system operator allocates financial transmission rights (FTRs) to investors in transmission expansion based upon their preferences, and revenue adequacy. The independent system operator (ISO) preserves some proxy FTRs to manage potential negative externalities that may result from expansion projects. This scheme could help European market coupling arrangements attract additional investment. (author)

  10. Merchant electricity transmission expansion: A European case study

    International Nuclear Information System (INIS)

    Kristiansen, T.; Rosellon, J.

    2010-01-01

    We apply a merchant transmission model to the trilateral market coupling (TLC) arrangement among the Netherlands, Belgium and France as an example, and note that it could further be applied to other market splitting or coupling of Europe's different national power markets. In this merchant framework the system operator allocates financial transmission rights (FTRs) to investors in transmission expansion based upon their preferences, and revenue adequacy. The independent system operator (ISO) preserves some proxy FTRs to manage potential negative externalities that may result from expansion projects. This scheme could help European market coupling arrangements attract additional investment. (author)

  11. Can the BestGrid Process Improve Stakeholder Involvement in Electricity Transmission Projects?

    Directory of Open Access Journals (Sweden)

    Nadejda Komendantova

    2015-08-01

    Full Text Available The European Union has set ambitious targets for deployment of renewable energy sources to reach goals of climate change mitigation and energy security policies. However, the current state of electricity transmission infrastructure is a major bottleneck for further scaling up of renewable energy in the EU. Several thousands of kilometers of new lines have to be constructed and upgraded to accommodate growing volumes of intermittent renewable electricity. In many countries, construction of electricity transmission projects has been delayed for several years due to concerns of local stakeholders. The innovative BESTGRID approach, reported here, brings together transmission system operators (TSOs and non-governmental organizations (NGOs to discuss and understand the nature of stakeholder concerns. This paper has three objectives: (1 to understand stakeholder concerns about the deployment of electricity transmission grids in four pilot projects according to five guiding principles: need, transparency, engagement, environment, and impacts on human health as well as benefits; (2 to understand how these principles can be addressed to provide a basis for better decision-making outcomes; and (3 to evaluate the BESTGRID process based on feedback received from stakeholders and the level of participation achieved according to the ladder of Arnstein. This paper goes beyond a discussion of “measures to mitigate opposition” to understand how dialogue between TSOs and the public—represented mainly by NGOs and policy-makers—might lead to a better decision-making process and more sustainable electricity transmission infrastructure deployment.

  12. Transmission pricing in privately-owned electricity grids: An illustration from the Argentine electricity pool

    International Nuclear Information System (INIS)

    Abdala, Manuel A.

    2008-01-01

    The Argentine electricity reform of 1992 offers an interesting example of decentralized transmission pricing arrangements within a competitive system. This paper is a shortened version of an original analysis made in 1994 of the regulation of the Argentine transmission system, with emphasis on investment cost allocation rules. To make up for the limitation of short-run marginal cost (SRMC) pricing, incentives on service quality were put in place, including penalties for lack of line availability. The mechanism for capacity expansion, based on ad-hoc rules for allocations of investment costs, had the potential to produce non-optimal investment outcomes, as such rules ignored beneficiaries on the demand side. For fine tuning of this system, I proposed an alternative rule based on traditional welfare analysis that broadens the universe of identified beneficiaries, and thus can be expected to produce a fairer outcome on investment cost allocation, reducing the potential risks of non-optimal investment. A brief postscript comments on the paper from the perspective of 2007. (author)

  13. Economies of scale in electricity generation and transmission since 1945

    International Nuclear Information System (INIS)

    Tombs, F.

    1978-01-01

    Progress in the electricity supply industry since 1945 is reviewed with particular reference to increased ratings of plant and transmission. The contribution of nuclear energy is emphasised. Developments which have taken place, and policy within the nuclear industry since the construction of Calder Hall, are examined. The performance of the Magnox stations, difficulties with AGRs, and the debate on the choice of reactors are discussed. (U.K.)

  14. Wireless Sensor Network for Electric Transmission Line Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Alphenaar, Bruce

    2009-06-30

    Generally, federal agencies tasked to oversee power grid reliability are dependent on data from grid infrastructure owners and operators in order to obtain a basic level of situational awareness. Since there are many owners and operators involved in the day-to-day functioning of the power grid, the task of accessing, aggregating and analyzing grid information from these sources is not a trivial one. Seemingly basic tasks such as synchronizing data timestamps between many different data providers and sources can be difficult as evidenced during the post-event analysis of the August 2003 blackout. In this project we investigate the efficacy and cost effectiveness of deploying a network of wireless power line monitoring devices as a method of independently monitoring key parts of the power grid as a complement to the data which is currently available to federal agencies from grid system operators. Such a network is modeled on proprietary power line monitoring technologies and networks invented, developed and deployed by Genscape, a Louisville, Kentucky based real-time energy information provider. Genscape measures transmission line power flow using measurements of electromagnetic fields under overhead high voltage transmission power lines in the United States and Europe. Opportunities for optimization of the commercial power line monitoring technology were investigated in this project to enable lower power consumption, lower cost and improvements to measurement methodologies. These optimizations were performed in order to better enable the use of wireless transmission line monitors in large network deployments (perhaps covering several thousand power lines) for federal situational awareness needs. Power consumption and cost reduction were addressed by developing a power line monitor using a low power, low cost wireless telemetry platform known as the ''Mote''. Motes were first developed as smart sensor nodes in wireless mesh networking applications

  15. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

  16. Electric power system applications of optimization

    CERN Document Server

    Momoh, James A

    2008-01-01

    Introduction Structure of a Generic Electric Power System  Power System Models  Power System Control Power System Security Assessment  Power System Optimization as a Function of Time  Review of Optimization Techniques Applicable to Power Systems Electric Power System Models  Complex Power Concepts Three-Phase Systems Per Unit Representation  Synchronous Machine Modeling Reactive Capability Limits Prime Movers and Governing Systems  Automatic Gain Control Transmission Subsystems  Y-Bus Incorporating the Transformer Effect  Load Models  Available Transfer Capability  Illustrative Examples  Power

  17. Unforeseen consequences of dedicated renewable energy transmission: Potential implications for renewable electricity development

    Energy Technology Data Exchange (ETDEWEB)

    Bezdek, Roger

    2010-09-15

    Renewable electricity generation requires expansion of electricity transmission, and the U.S. is planning to build a 'green' transmission lines restricted to renewable electricity. However, local jurisdictions are resisting this unless the transmission serves local constituents and existing power plants. This paper finds that if such transmission is built and local access allowed, then the major beneficiaries may be existing power plants. Their access to added transmission could enable them to sell electric power at rates against which renewables cannot compete. These issues must be addressed if large additions of new transmission lines are to facilitate expansion of renewable electricity generation worldwide.

  18. The effect of electric transmission constraints on how power generation companies bid in the Colombian electrical power market

    Directory of Open Access Journals (Sweden)

    Luis Eduardo Gallego Vega

    2010-05-01

    Full Text Available This paper presents the results of research about the effect of transmission constraints on both expected electrical energy to be dispatched and power generation companies’ bidding strategies in the Colombian electrical power market. The proposed model simulates the national transmission grid and economic dispatch by means of optimal power flows. The proposed methodology allows structural problems in the power market to be analyzed due to the exclusive effect of trans- mission constraints and the mixed effect of bidding strategies and transmission networks. A new set of variables is proposed for quantifying the impact of each generation company on system operating costs and the change in expected dispatched energy. A correlation analysis of these new variables is presented, revealing some interesting linearities in some generation companies’ bidding patterns.

  19. The effect of Ontario's transmission system policies on cogeneration projects

    International Nuclear Information System (INIS)

    Carr, J.

    1999-01-01

    The impact that the establishment of transmission tariffs would have on the viability of cogeneration projects in Ontario was discussed. The proposal to establish such tariffs on the basis of a 'postage stamp' rate would ensure that all electricity users have access to electricity at the same price. However, this would unfairly penalize short-haul transmission transactions and would possibly result in the inappropriate location of new generation facilities. Electricity users would ultimately be burdened with these inefficiencies. This presentation also discussed another public policy which proposes to determine what parts of the electricity system should have their costs recovered at postage stamp rates. The costs would include not only transmission charges but also distribution and generation costs. The restructuring of Ontario Hydro into the Ontario Power Generation Company (OPGC) and the Ontario Hydro Services Company (OHSC) and its impact on the cogeneration projects was also discussed

  20. Electrical railway transportation systems

    CERN Document Server

    Brenna, Morris; Zaninelli, Dario

    2018-01-01

    Allows the reader to deepen their understanding of various technologies for both fixed power supply installations of railway systems and for railway rolling stock. This book explores the electric railway systems that play a crucial role in the mitigation of congestion and pollution caused by road traffic. It is divided into two parts: the first covering fixed power supply systems, and the second concerning the systems for railway rolling stock. In particular, after a historical introduction to the framework of technological solutions in current use, the authors investigate electrification systems for the power supply of rail vehicles, trams, and subways. Electrical Railway Transportation Systems explores the direct current systems used throughout the world for urban and suburban transport, which are also used in various countries for regional transport. It provides a study of alternating current systems, whether for power supply frequency or for special railway frequency, that are used around the world for ...

  1. The electrical system of nuclear power plant

    International Nuclear Information System (INIS)

    Firman Silitonga; Gunarwan Prayitno

    2009-01-01

    In these system, electrical power system is supplied from two-offsite transmission system respective main transformer and house service transformer; and reserve transformer. The electrical load in these system consist of safety electrical system and non-safety electrical system, The safety electrical and non safety electrical systems consist of four 6,9 kV AC medium voltage bus and 480 V AC low voltage bus system. The DC power system consist of four safety 125 V DC power system and the two non-safety 125 DC power systems. The equipment in these electrical system is main turbine-generator; GTG safety; GTG alternate; uninterrupted power supply (UPS) and battery system. To protect electrical equipment and building to direct stroke and non direct stroke disturbances is installed netral grounding system and lightning protection and protection the personnel to touch-voltage is installed equipment grounding system and station grounding. The lightning arrester system is connected to station station grounding system. (author)

  2. Transmission grid requirements with scattered and flutuating renewable electricity sources

    DEFF Research Database (Denmark)

    Østergaard, Poul Alberg

    2002-01-01

    Denmark is in a situation with many scattered sources of electricity, that are not controlled by the central load dispatch. At the same time, Denmark is being used as an electricity transit corridor between Norway/Sweden and Germany. Through energy systems analyses and load-flow analyses......, it is determined that if scattered load balancing is introduced, electricity transit is enabled to a higher degree than if central load balancing is maintained....

  3. Transmission of electric dipole radiation through an interface

    Energy Technology Data Exchange (ETDEWEB)

    Arnoldus, Henk F., E-mail: hfa1@msstate.edu [Department of Physics and Astronomy, Mississippi State University, P.O. Drawer 5167, Mississippi State, MS 39762-5167 (United States); Berg, Matthew J., E-mail: matt.berg@msstate.edu [Department of Physics and Astronomy, Mississippi State University, P.O. Drawer 5167, Mississippi State, MS 39762-5167 (United States); Li, Xin, E-mail: Xin.Li@millersville.edu [Department of Physics, P.O. Box 1002, Millersville University, Millersville, PA 17551 (United States)

    2014-02-07

    We consider the transmission of electric dipole radiation through an interface between two dielectrics, for the case of a vertical dipole. Energy flows along the field lines of the Poynting vector, and in the optical near field these field lines are curves (as opposed to optical rays). When the radiation passes through the interface into a thicker medium, the field lines bend to the normal (as rays do), but the transmission angle is not related to the angle of incidence. The redirection of the radiation at the interface is determined by the angle dependence of the transmission coefficient. This near-field redistribution is responsible for the far-field angular power pattern. When the transmission medium is thinner than the embedding medium of the dipole, some energy flows back and forth through the interface in an oscillating fashion. In each area where field lines dip below the interface, an optical vortex appears just above the interface. The centers of these vortices are concentric singular circles around the dipole axis.

  4. High voltage transmission of electrical energy over long distances

    Energy Technology Data Exchange (ETDEWEB)

    Tewari, S W

    1962-07-01

    Technical aspects of ac transmission lines, additional means of improving stability ac transmisson lines, insulation problems, ac transmission by cables, high voltage dc transmission, advantages of dc over ac transmission, disadvantages of dc transmission, use of underground cables for dc transmission, history of the development of conversion equipment; transmission schemes adopted on Gotland Island, Sweden; and economics of ac and dc transmission are discussed.

  5. Electric power systems

    CERN Document Server

    Weedy, B M; Jenkins, N; Ekanayake, J B; Strbac, G

    2012-01-01

    The definitive textbook for Power Systems students, providing a grounding in essential power system theory while also focusing on practical power engineering applications. Electric Power Systems has been an essential book in power systems engineering for over thirty years. Bringing the content firmly up-to-date whilst still retaining the flavour of Weedy's extremely popular original, this Fifth Edition has been revised by experts Nick Jenkins, Janaka Ekanayake and Goran Strbac. This wide-ranging text still covers all of the fundamental power systems subjects but is now e

  6. Beta attenuation transmission system (BATS)

    Energy Technology Data Exchange (ETDEWEB)

    Hagan, R.C.; Fullbright, H.J.

    1977-01-01

    The beta attenuation transmission system (BATS) is an automated radiation gauge designed for quantitative measurement of component thickness in explosive detonators. The BATS was designed and built by Group M-1, the Nondestructive Testing Group, of the Los Alamos Scientific Laboratory to measure the areal thickness, in mg/cm/sup 2/, of a cylinder of high explosive (HE) enclosed within a plastic holder. The problem is to determine the density of the HE. A /sup 90/Sr source is collimated by a 0.25 x 1.59-mm slit, and the transmitted beta-particle flux is detected by a plastic scintillator, coupled to a photomultiplier tube. The detonator is transported through the radiation beam by a leadscrew, ballnut, stepping-motor combination. Continuous analog position data are available, derived from the output from a linear-actuated potentiometer attached to the scanner. A linear electrometer amplifies the detected signal, which is then integrated for a preselected time, to obtain the desired statistical accuracy. A microprocessor (..mu..P) is used to control the scanner position and to make the data readings at the assigned positions. The data are stored, and, at the completion of the scan, are processed into the desired format. The final answer is displayed to the operator or output to a peripheral device for permanent record. The characteristics of the radiation source, the collimator, the signal detection and conditioning, and the final results are described in detail. The scanner and the microprocessor control system are briefly outlined.

  7. Beta attenuation transmission system (BATS)

    International Nuclear Information System (INIS)

    Hagan, R.C.; Fullbright, H.J.

    1977-01-01

    The beta attenuation transmission system (BATS) is an automated radiation gauge designed for quantitative measurement of component thickness in explosive detonators. The BATS was designed and built by Group M-1, the Nondestructive Testing Group, of the Los Alamos Scientific Laboratory to measure the areal thickness, in mg/cm 2 , of a cylinder of high explosive (HE) enclosed within a plastic holder. The problem is to determine the density of the HE. A 90 Sr source is collimated by a 0.25 x 1.59-mm slit, and the transmitted beta-particle flux is detected by a plastic scintillator, coupled to a photomultiplier tube. The detonator is transported through the radiation beam by a leadscrew, ballnut, stepping-motor combination. Continuous analog position data are available, derived from the output from a linear-actuated potentiometer attached to the scanner. A linear electrometer amplifies the detected signal, which is then integrated for a preselected time, to obtain the desired statistical accuracy. A microprocessor (μP) is used to control the scanner position and to make the data readings at the assigned positions. The data are stored, and, at the completion of the scan, are processed into the desired format. The final answer is displayed to the operator or output to a peripheral device for permanent record. The characteristics of the radiation source, the collimator, the signal detection and conditioning, and the final results are described in detail. The scanner and the microprocessor control system are briefly outlined

  8. Fabrication and electric measurements of nanostructures inside transmission electron microscope.

    Science.gov (United States)

    Chen, Qing; Peng, Lian-Mao

    2011-06-01

    Using manipulation holders specially designed for transmission electron microscope (TEM), nanostructures can be characterized, measured, modified and even fabricated in-situ. In-situ TEM techniques not only enable real-time study of structure-property relationships of materials at atomic scale, but also provide the ability to control and manipulate materials and structures at nanoscale. This review highlights in-situ electric measurements and in-situ fabrication and structure modification using manipulation holder inside TEM. Copyright © 2011 Elsevier B.V. All rights reserved.

  9. Fabrication and electric measurements of nanostructures inside transmission electron microscope

    International Nuclear Information System (INIS)

    Chen, Qing; Peng, Lian-Mao

    2011-01-01

    Using manipulation holders specially designed for transmission electron microscope (TEM), nanostructures can be characterized, measured, modified and even fabricated in-situ. In-situ TEM techniques not only enable real-time study of structure-property relationships of materials at atomic scale, but also provide the ability to control and manipulate materials and structures at nanoscale. This review highlights in-situ electric measurements and in-situ fabrication and structure modification using manipulation holder inside TEM. -- Research highlights: → We review in-situ works using manipulation holder in TEM. → In-situ electric measurements, fabrication and structure modification are focused. → We discuss important issues that should be considered for reliable results. → In-situ TEM is becoming a very powerful tool for many research fields.

  10. Transmission embedded cost allocation methodology with consideration of system reliability

    International Nuclear Information System (INIS)

    Hur, D.; Park, J.-K.; Yoo, C.-I.; Kim, B.H.

    2004-01-01

    In a vertically integrated utility industry, the cost of reliability, as a separate service, has not received much rigorous analysis. However, as a cornerstone of restructuring the industry, the transmission service pricing must change to be consistent with, and supportive of, competitive wholesale electricity markets. This paper focuses on the equitable allocation of transmission network embedded costs including the transmission reliability cost based on the contributions of each generator to branch flows under normal conditions as well as the line outage impact factor under a variety of load levels. A numerical example on a six-bus system is given to illustrate the applications of the proposed methodology. (author)

  11. An agent-based analysis of the German electricity market with transmission capacity constraints

    International Nuclear Information System (INIS)

    Veit, Daniel J.; Weidlich, Anke; Krafft, Jacob A.

    2009-01-01

    While some agent-based models have been developed for analyzing the German electricity market, there has been little research done on the emerging issue of intra-German congestion and its effects on the bidding behavior of generator agents. Yet, studies of other markets have shown that transmission grid constraints considerably affect strategic behavior in electricity markets. In this paper, the implications of transmission constraints on power markets are analyzed for the case of Germany. Market splitting is applied in the case of congestion in the grid. For this purpose, the agent-based modeling of electricity systems (AMES) market package developed by Sun and Tesfatsion is modified to fit the German context, including a detailed representation of the German high-voltage grid and its interconnections. Implications of transmission constraints on prices and social welfare are analyzed for scenarios that include strategic behavior of market participants and high wind power generation. It can be shown that strategic behavior and transmission constraints are inter-related and may pose severe problems in the future German electricity market.

  12. An agent-based analysis of the German electricity market with transmission capacity constraints

    Energy Technology Data Exchange (ETDEWEB)

    Veit, Daniel J.; Weidlich, Anke; Krafft, Jacob A. [University of Mannheim, Dieter Schwarz Chair of Business Administration, E-Business and E-Government, 68131 Mannheim (Germany)

    2009-10-15

    While some agent-based models have been developed for analyzing the German electricity market, there has been little research done on the emerging issue of intra-German congestion and its effects on the bidding behavior of generator agents. Yet, studies of other markets have shown that transmission grid constraints considerably affect strategic behavior in electricity markets. In this paper, the implications of transmission constraints on power markets are analyzed for the case of Germany. Market splitting is applied in the case of congestion in the grid. For this purpose, the agent-based modeling of electricity systems (AMES) market package developed by Sun and Tesfatsion is modified to fit the German context, including a detailed representation of the German high-voltage grid and its interconnections. Implications of transmission constraints on prices and social welfare are analyzed for scenarios that include strategic behavior of market participants and high wind power generation. It can be shown that strategic behavior and transmission constraints are inter-related and may pose severe problems in the future German electricity market. (author)

  13. NSTX Electrical Power Systems

    International Nuclear Information System (INIS)

    A. Ilic; E. Baker; R. Hatcher; S. Ramakrishnan; et al

    1999-01-01

    The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physic Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. The design of the NSTX electrical power system was tailored to suit the available infrastructure and electrical equipment on site. Components were analyzed to verify their suitability for use in NSTX. The total number of circuits and the location of the NSTX device drove the major changes in the Power system hardware. The NSTX has eleven (11) circuits to be fed as compared to the basic three power loops for TFTR. This required changes in cabling to insure that each cable tray system has the positive and negative leg of cables in the same tray. Also additional power cabling had to be installed to the new location. The hardware had to b e modified to address the need for eleven power loops. Power converters had to be reconnected and controlled in anti-parallel mode for the Ohmic heating and two of the Poloidal Field circuits. The circuit for the Coaxial Helicity Injection (CHI) System had to be carefully developed to meet this special application. Additional Protection devices were designed and installed for the magnet coils and the CHI. The thrust was to making the changes in the most cost-effective manner without compromising technical requirements. This paper describes the changes and addition to the Electrical Power System components for the NSTX magnet systems

  14. Strategic environmental evaluation of National Transmission System Plan in Italy

    International Nuclear Information System (INIS)

    Lanadio, E.; Motawi, A.; Rizzuto, R.; Cappiello, A.; Micotti, M.

    2008-01-01

    The entry into force of part II of D. Lgs. 152/2006 establishing the procedures for strategic environmental assessment for plans and programs. The application of legislation to the development plan of the electric network of the National Transmission System verify testing conducted by Terna with ministries and authorities with environmental competences [it

  15. Estimating zonal electricity supply curves in transmission-constrained electricity markets

    International Nuclear Information System (INIS)

    Sahraei-Ardakani, Mostafa; Blumsack, Seth; Kleit, Andrew

    2015-01-01

    Many important electricity policy initiatives would directly affect the operation of electric power networks. This paper develops a method for estimating short-run zonal supply curves in transmission-constrained electricity markets that can be implemented quickly by policy analysts with training in statistical methods and with publicly available data. Our model enables analysis of distributional impacts of policies affecting operation of electric power grid. The method uses fuel prices and zonal electric loads to determine piecewise supply curves, identifying zonal electricity price and marginal fuel. We illustrate our methodology by estimating zonal impacts of Pennsylvania's Act 129, an energy efficiency and conservation policy. For most utilities in Pennsylvania, Act 129 would reduce the influence of natural gas on electricity price formation and increase the influence of coal. The total resulted savings would be around 267 million dollars, 82 percent of which would be enjoyed by the customers in Pennsylvania. We also analyze the impacts of imposing a $35/ton tax on carbon dioxide emissions. Our results show that the policy would increase the average prices in PJM by 47–89 percent under different fuel price scenarios in the short run, and would lead to short-run interfuel substitution between natural gas and coal. - Highlights: • We develop a method to estimate of zonal supply curves in electricity markets. • The model estimates zonal electricity prices and zonal fuel utilization. • The model implicitly captures the average impacts of transmission constraints. • Using the method, we project supply curves for the seventeen utility zones of PJM. • We use the estimated supply curves to study the impacts of Pennsylvania's Act 129 and a carbon tax of $35 per ton

  16. Fractional analysis for nonlinear electrical transmission line and nonlinear Schroedinger equations with incomplete sub-equation

    Science.gov (United States)

    Fendzi-Donfack, Emmanuel; Nguenang, Jean Pierre; Nana, Laurent

    2018-02-01

    We use the fractional complex transform with the modified Riemann-Liouville derivative operator to establish the exact and generalized solutions of two fractional partial differential equations. We determine the solutions of fractional nonlinear electrical transmission lines (NETL) and the perturbed nonlinear Schroedinger (NLS) equation with the Kerr law nonlinearity term. The solutions are obtained for the parameters in the range (0<α≤1) of the derivative operator and we found the traditional solutions for the limiting case of α =1. We show that according to the modified Riemann-Liouville derivative, the solutions found can describe physical systems with memory effect, transient effects in electrical systems and nonlinear transmission lines, and other systems such as optical fiber.

  17. A proposal for transmission pricing methodology in Thailand based on electricity tracing and long-run average incremental cost

    International Nuclear Information System (INIS)

    Limpasuwan, T.; Bialek, J.W.; Ongsakul, W.; Limmeechokchai, B.

    2004-01-01

    Although there is no universally accepted methodology for restructuring of electricity supply industry, the transformations often involve separation of generation and transmission. Such separation results in a need for a transmission service charge to be levied on the system users. The National Energy Policy Office (NEPO) of Thailand has commissioned PricewaterhouseCooper (PwC) to propose a transmission service charge that is to be used during the market reform for the transmission business unit of the Electricity Generating Authority of Thailand (EGAT). Although the PwCs transmission use of system charge (TUOS) based on the long-run average incremental cost (LRAIC) and average transmission loss can satisfy the financial requirements, the charge allocations are not economically efficient since they do not provide any locational signal which could reflect costs imposed on the system by locating a system user in a particular geographical location. This paper describes the TUOS methodology suggested by PwC and makes a comparison with a transmission pricing method based on combination of the electricity tracing and LRAIC. The results indicate that, with electricity tracing, the charge allocations are improved in terms of fairness, as the charge reflects the geographical location and system conditions

  18. Advanced electrical power system technology for the all electric aircraft

    Science.gov (United States)

    Finke, R. C.; Sundberg, G. R.

    1983-01-01

    The application of advanced electric power system technology to an all electric airplane results in an estimated reduction of the total takeoff gross weight of over 23,000 pounds for a large airplane. This will result in a 5 to 10 percent reduction in direct operating costs (DOC). Critical to this savings is the basic electrical power system component technology. These advanced electrical power components will provide a solid foundation for the materials, devices, circuits, and subsystems needed to satisfy the unique requirements of advanced all electric aircraft power systems. The program for the development of advanced electrical power component technology is described. The program is divided into five generic areas: semiconductor devices (transistors, thyristors, and diodes); conductors (materials and transmission lines); dielectrics; magnetic devices; and load management devices. Examples of progress in each of the five areas are discussed. Bipolar power transistors up to 1000 V at 100 A with a gain of 10 and a 0.5 microsec rise and fall time are presented. A class of semiconductor devices with a possibility of switching up to 100 kV is described. Solid state power controllers for load management at 120 to 1000 V and power levels to 25 kW were developed along with a 25 kW, 20 kHz transformer weighing only 3.2 kg. Previously announced in STAR as N83-24764

  19. Advanced electrical power system technology for the all electric aircraft

    Science.gov (United States)

    Finke, R. C.; Sundberg, G. R.

    1983-01-01

    The application of advanced electric power system technology to an all electric airplane results in an estimated reduction of the total takeoff gross weight of over 23,000 pounds for a large airplane. This will result in a 5 to 10 percent reduction in direct operating costs (DOC). Critical to this savings is the basic electrical power system component technology. These advanced electrical power components will provide a solid foundation for the materials, devices, circuits, and subsystems needed to satisfy the unique requirements of advanced all electric aircraft power systems. The program for the development of advanced electrical power component technology is described. The program is divided into five generic areas: semiconductor devices (transistors, thyristors, and diodes); conductors (materials and transmission lines); dielectrics; magnetic devices; and load management devices. Examples of progress in each of the five areas are discussed. Bipolar power transistors up to 1000 V at 100 A with a gain of 10 and a 0.5 microsec rise and fall time are presented. A class of semiconductor devices with a possibility of switching up to 100 kV is described. Solid state power controllers for load management at 120 to 1000 V and power levels to 25 kW were developed along with a 25 kW, 20 kHz transformer weighing only 3.2 kg.

  20. SAInt – A novel quasi-dynamic model for assessing security of supply in coupled gas and electricity transmission networks

    NARCIS (Netherlands)

    Pambour, Kwabena Addo; Cakir Erdener, Burcin; Bolado-Lavin, Ricardo; Dijkema, Gerhard P.J.

    2017-01-01

    The integration of renewable energy sources into existing electric power systems is connected with an increased interdependence between natural gas and electricity transmission networks. To analyse this interdependence and its impact on security of supply, we developed a novel quasi-dynamic

  1. Development of a coordinated control system for BWR nuclear power plant and HVDC transmission system

    International Nuclear Information System (INIS)

    Ishikawa, M.; Hara, T.; Hirayama, K.; Sekiya, K.

    1986-01-01

    The combined use of dc and ac transmissions or so-called hybrid transmission was under study, employing both dc and ac systems to enable stable transmission of 10,000 MW of electric power generated by the BWR nuclear plant, scheduled to be built about 800 km away from the center of the load. It was thus necessary to develop a hybrid power transmission control system, the hybrid power transmission system consisting of a high voltage dc transmission system (HVDC) and an ultrahigh ac transmission system (UHVAC). It was also necessary to develop a control system for HVDC transmission which protects the BWR nuclear power plant from being influenced by any change in transmission mode that occurs as a result of faults on the UHVAC side when the entire power of the BWR plant is being sent by the HVDC transmission. This paper clarifies the requirements for the HVDC system control during hybrid transmission and also during dc transmission. The control method that satisfies these requirements was studied to develop a control algorithm

  2. Getting to Gender Equality in Energy Infrastructure : Lessons from Electricity Generation, Transmission, and Distribution Projects

    OpenAIRE

    Orlando, Maria Beatriz; Janik, Vanessa Lopes; Vaidya, Pranav; Angelou, Nicolina; Zumbyte, Ieva; Adams, Norma

    2018-01-01

    Getting to Gender Equality in Electricity Infrastructure: Lessons from Electricity Generation, Transmission, and Distribution Projects examines the social and gender footprint of large-scale electricity generation, transmission, and distribution projects to establish a foundation on which further research and replication of good practices can be built. The main impact pathways analyzed are...

  3. Optimizing electrical distribution systems

    International Nuclear Information System (INIS)

    Scott, W.G.

    1990-01-01

    Electrical utility distribution systems are in the middle of an unprecedented technological revolution in planning, design, maintenance and operation. The prime movers of the revolution are the major economic shifts that affect decision making. The major economic influence on the revolution is the cost of losses (technical and nontechnical). The vehicle of the revolution is the computer, which enables decision makers to examine alternatives in greater depth and detail than their predecessors could. The more important elements of the technological revolution are: system planning, computers, load forecasting, analytical systems (primary systems, transformers and secondary systems), system losses and coming technology. The paper is directed towards the rather unique problems encountered by engineers of utilities in developing countries - problems that are being solved through high technology, such as the recent World Bank-financed engineering computer system for Sri Lanka. This system includes a DEC computer, digitizer, plotter and engineering software to model the distribution system via a digitizer, analyse the system and plot single-line diagrams. (author). 1 ref., 4 tabs., 6 figs

  4. A modular restoration tower for electric power line transmission

    Energy Technology Data Exchange (ETDEWEB)

    Nicolazzi, L.C.; Pereira, J.C.; Leonel, C.E.L.; Rocha, G.B.; Bianchezzi, V.; Mendes, F. [Universidade Federal Santa Catarina (UFSC), Florianopolis, SC (Brazil). Dept. de Engenharia Mecanica], Emails: lauro@grante.ufsc.br, jcarlos@grante.ufsc.br; Luz, R.L. [ELETROSUL Centrais Eletricas S.A., Florianopolis, SC (Brazil)], Email: rluz@eletrosul.gov.br

    2009-07-01

    The main target of this R and D project is to develop an restoration tower for electric energy lines transmission. Whereas these towers should present the main features like transport facility, easiest assembling associated with a low cost of manufacture, it was applied the single-column tower concepts supported by stays, modularized, framed and articulated at the base. The concepts used for this development was a design methodology. From the different definition situations of load, numerical models have been developed focusing the design to the best of structural element arrangements of its modules. Then, tests were performed in laboratory to determine the module structural performance for different work load situations. These tests served to identify inconsistencies in the numerical models and proposed adjustments in its design to improve its performance on the strength and stability. (author)

  5. Development of a model for integrated simulation of the European transmission networks and electricity markets

    International Nuclear Information System (INIS)

    Rathke, Christian

    2013-01-01

    The liberalisation of electricity markets and the increase of renewable energy generation actually causes dramatic changes for the whole European power industry. The transmission system operators in particular have to meet the challenge to ensure a stable and reliable system operation in the future. Significant changes in power generation will require a substantial extension to current inadequate original transmission grids to handle increased wide area power flows. This is the only way to avoid overloading the grid and to reduce the herefrom resulting limitations for the Pan-European cross-border trade of electricity. This work describes in detail the development of a Pan-European integrated grid and an electricity market simulation tool. For this purpose an overview about the today's structure of the European electricity industry is given initially. Afterwards the configuration of the transmission grid, the used equipment and different methods for the load flow and short circuit calculation are explained. Furthermore models for the calculation of local loads and the power plant dispatch are presented in the following chapters. Following on from this a detailed model of the European electricity industry is developed and the main functions are described by means of some exemplary simulations. The simulation tool developed in this work enables the user to calculate realistic power plant schedules and the consequent resulting physical effects on the European transmission grid. It combines a time series based simulation of the electricity market with a detailed model of the transmission grid. The highly detailing of the model offers the feasibility to execute a complete AC load flow calculation using the Newton Raphson algorithm.Therefore it is possible to identify the active as well as the reactive power flows in the grid. The results of the power flow calculation are the basis for further investigations (e. g. the short circuit calculation) and to decide on

  6. Possibilities for Automatic Control of Hydro-Mechanical Transmission and Birotating Electric Machine

    Directory of Open Access Journals (Sweden)

    V. V. Mikhailov

    2014-01-01

    Full Text Available The paper presents mathematical models and results of virtual investigations pertaining to the selected motion parameters of a mobile machine equipped with hydro mechanical and modernized transmissions. The machine has been tested in similar technological cycles and it has been equipped with a universal automatic control system. Changes in structure and type of power transmission have been obtained with the help of a control algorithm including an extra reversible electric machine which is switched in at some operational modes.Implementation of the proposed  concept makes it possible to obtain and check the improved C-code of the control system and enhance operational parameters of the transmission and machine efficiency, reduce slippage and tire wear while using braking energy for its later beneficial use which is usually considered as a consumable element.

  7. A multi-objective framework for dynamic transmission expansion planning in competitive electricity market

    International Nuclear Information System (INIS)

    Foroud, Asghar Akbari; Abdoos, Ali Akbar; Keypour, Reza; Amirahmadi, Meisam

    2010-01-01

    Restructuring of power system has changed the traditional planning objectives and introduced challenges in the field of Transmission Expansion Planning (TEP). Due to these changes, new approaches and criteria are needed for transmission planning in deregulated environment. Therefore, in this paper, a dynamic expansion methodology is presented using a multi-objective optimization framework. Investment cost, congestion cost and reliability are considered in the optimization as three objectives. To overcome the difficulties in solving the non-convex and mixed integer nature of the optimization problems, a Non-Dominated Sorting Genetic Algorithm (NSGA II) approach is used followed by a fuzzy decision making analysis to obtain the final optimal solution. The planning methodology has been demonstrated on the IEEE 24-bus test system and north-east of Iran national 400 kV transmission grid to show the feasibility and capabilities of the proposed algorithm in electricity market environment. (author)

  8. Model for the ready definition and approximate comparison of alternative high voltage transmission systems. Phases II and III. Application to electric systems within the contiguous United States. [800 and 1200 kV; 400, 600, and 800 kV dc

    Energy Technology Data Exchange (ETDEWEB)

    1979-08-01

    Research on power delivery alternatives is reported. The first phase of this work was to develop a model of overhead transmission systems in the range of 362 to 1200 kV ac, and +-400 to +-800 kV dc. Such systems included transmission from generation to load and inter-connection of two large integrated systems, with and without the existence of an underlying lower voltage network in either case. This phase has been completed. The second and third phases involved application of the model to electric systems within selected regions of the US, and the entire US, respectively, dealing with real situations and including projected expansion to year 1987. The potential benefits and costs of using higher than existing transmission voltages were to be evaluated on this basis. Additionally, the most advantageous new voltage was to be determined taking into account direct and indirect benefits and costs. The results of the second and third phases are presented.

  9. TOPEX electrical power system

    Science.gov (United States)

    Chetty, P. R. K.; Roufberg, Lew; Costogue, Ernest

    1991-01-01

    The TOPEX mission requirements which impact the power requirements and analyses are presented. A description of the electrical power system (EPS), including energy management and battery charging methods that were conceived and developed to meet the identified satellite requirements, is included. Analysis of the TOPEX EPS confirms that all of its electrical performance and reliability requirements have been met. The TOPEX EPS employs the flight-proven modular power system (MPS) which is part of the Multimission Modular Spacecraft and provides high reliability, abbreviated development effort and schedule, and low cost. An energy balance equation, unique to TOPEX, has been derived to confirm that the batteries will be completely recharged following each eclipse, under worst-case conditions. TOPEX uses three NASA Standard 50AH Ni-Cd batteries, each with 22 cells in series. The MPS contains battery charge control and protection based on measurements of battery currents, voltages, temperatures, and computed depth-of-discharge. In case of impending battery depletion, the MPS automatically implements load shedding.

  10. 76 FR 70122 - Plan for Conduct of 2012 Electric Transmission Congestion Study

    Science.gov (United States)

    2011-11-10

    ... regional reliability councils, regional transmission organizations (RTOs) and independent system operators... transmission organizations (RTOs), independent system operators (ISOs), and other stakeholders to describe...

  11. FEV's new parallel hybrid transmission with single dry clutch and electric torque support

    Energy Technology Data Exchange (ETDEWEB)

    Hellenbroich, Gereon [VKA, RWTH Aachen (Germany); Rosenburg, Volker [FEV Motorentechnik GmbH, Aachen (Germany)

    2009-07-01

    FEV is currently developing a new 7-speed hybrid transmission for transverse installation. The transmission with a design torque of 320 Nm is based on AMT (automated manual transmission) technology and uses a single electric motor. The innovative gear set layout combines the advantages of modern AMTs such as best efficiency, low costs and few components with full hybrid capabilities and electric torque support during all gear shifts. Furthermore, the gear set layout allows for very short-shift-times due to the favorable distribution of inertias. Other features include an A/C compressor being electrically driven by the electric motor of the transmission during start/stop phases. (orig.)

  12. Centralised and distributed electricity systems

    International Nuclear Information System (INIS)

    Bouffard, Francois; Kirschen, Daniel S.

    2008-01-01

    Because of their high level of integration, centralised energy supply systems are vulnerable to disturbances in the supply chain. In the case of electricity especially, this supply paradigm is losing some of its appeal. Apart from vulnerability, a number of further aggravating factors are reducing its attractiveness. They include the depletion of fossil fuels and their climate change impact, the insecurities affecting energy transportation infrastructure, and the desire of investors to minimise risks through the deployment of smaller-scale, modular generation and transmission systems. Small-scale decentralised systems, where energy production and consumption are usually tightly coupled, are emerging as a viable alternative. They are less dependent upon centralised energy supply, and can sometimes use more than one energy source. They are less sensitive to the uncertain availability of remote primary energy and transportation networks. In addition, the close connection between energy generation and use makes decentralised systems cleaner because they are most often based on renewable energies or on high-efficiency fossil fuel-based technologies such as combined heat and power (CHP). Fully decentralised energy supply is not currently possible or even truly desirable. The secure and clean energy systems of the future will be those flexible enough to allow for a spectrum of hybrid modes of operation and investment, combining the best attributes of both paradigms. A large part of this flexibility will come from the networks that make it possible to combine these two types of infrastructures and obtain the benefits of both approaches

  13. Medium-term forecast of the Germany-wide electricity supply to final consumers for the calendar years 2016 to 2020. Study on behalf of the German transmission system operators

    International Nuclear Information System (INIS)

    Elsland, Rainer; Bossmann, Tobias; Klingler, Anna-Lena; Friedrichsen, Nele; Klobasa, Marian

    2015-01-01

    The German transmission system operators are obliged to make and publish forecasts on the development of the nationwide EEG apportionment on a calendar year basis. An important part of this study is a forecast of the electricity consumption to final consumers. In addition the electricity consumption of the self-suppliers,the final consumption is to be investigated according to the privilege categories for which the EEG apportionment has to be paid in a reduced amount. The final consumption amounted to about 463 TWh in 2014 and falls steadily to about 446 TWh by 2020. In 2016 the final consumption is about 460 TWh. The decline in final consumption is slightly more pronounced than in the case of net electricity demand, which is attributable to the rising self-supply. The net electricity demand in 2014 was about 513 TWh, which is about 15 TWh lower than in 2013. The decline is due in part to an increase in energy efficiency in electricity-based applications and on the other hand to mild weather. In the reference scenario, net electricity demand will decline from about 512 TWh in 2016 to about 506 TWh in 2020. The net electricity demand in the sectors of households and industry is decreasing, but increasing in the area of the TCS sector and the transport sector. In the course of the renewal of the EEG in 2014, regulations for the self-supply of electricity have been introduced for the first time, according to which operators of new plants larger than 10 kW and an annual self-sufficiency of more than 10 MWh have to pay a proportionate EEG apportionment, which increases in the subsequent years. While this regulation in the TCS sector leads to a stagnation of self-supply, the industrial sector is expected to continue replacement construction. An increase in the PV self-supply volume is expected for private households. Self-supply will increase from around 52 TWh in 2016 to around 53 TWh in 2020. The development of the future non-privileged final consumption, which is

  14. NASA Electric Propulsion System Studies

    Science.gov (United States)

    Felder, James L.

    2015-01-01

    An overview of NASA efforts in the area of hybrid electric and turboelectric propulsion in large transport. This overview includes a list of reasons why we are looking at transmitting some or all of the propulsive power for the aircraft electrically, a list of the different types of hybrid-turbo electric propulsion systems, and the results of 4 aircraft studies that examined different types of hybrid-turbo electric propulsion systems.

  15. Feasibility study of wireless power transmission systems

    Science.gov (United States)

    Robinson, W. J., Jr.

    1968-01-01

    Wireless microwave or laser energy transfers power from a manned earth-orbiting central station to unmanned astronomical substations. More efficient systems are required for the microwave power transmission.

  16. Transmission cost allocation for an efficient tariff action of electricity in a liberalised market

    International Nuclear Information System (INIS)

    Bassi, C.; Caldon, R.; Lorenzoni, A.

    1999-01-01

    The work is focused on the evaluation of the costs of an electricity transmission system operator and on their allocation among the users of the grid in liberalized market. After a recall of the goals of an efficient tariff for transmission, an original method for the cost allocation is proposed called ZI. Based on the marginal cost approach, this method could be the base for setting an efficient transmission tariff that at the same time covers costs and stimulates efficient behaviours. The performances of such an approach have been tested on a real 47 bus grid and ZI tariffs have been compared to the traditional postage stamp ones, highlighting the strong differences between them [it

  17. Shifting and power sharing control of a novel dual input clutchless transmission for electric vehicles

    Science.gov (United States)

    Liang, Jiejunyi; Yang, Haitao; Wu, Jinglai; Zhang, Nong; Walker, Paul D.

    2018-05-01

    To improve the overall efficiency of electric vehicles and guarantee the driving comfort and vehicle drivability under the concept of simplifying mechanism complexity and minimizing manufacturing cost, this paper proposes a novel clutchless power-shifting transmission system with shifting control strategy and power sharing control strategy. The proposed shifting strategy takes advantage of the transmission architecture to achieve power-on shifting, which greatly improves the driving comfort compared with conventional automated manual transmission, with a bump function based shifting control method. To maximize the overall efficiency, a real-time power sharing control strategy is designed to solve the power distribution problem between the two motors. Detailed mathematical model is built to verify the effectiveness of the proposed methods. The results demonstrate the proposed strategies considerably improve the overall efficiency while achieve non-interrupted power-on shifting and maintain the vehicle jerk during shifting under an acceptable threshold.

  18. Economic impact assessment and operational decision making in emission and transmission constrained electricity markets

    International Nuclear Information System (INIS)

    Nanduri, Vishnu; Kazemzadeh, Narges

    2012-01-01

    Highlights: ► We develop a bilevel game-theoretic model for allowance and electricity markets. ► We solve the model using a reinforcement learning algorithm. ► Model accounts for transmission constraints, cap-and-trade constraints. ► Study demonstrated on 9-bus electric power network. ► Obtain insights about supply shares, impact of transmission constraints, and cost pass through. -- Abstract: Carbon constrained electricity markets are a reality in 10 northeastern states and California in the US, as well as the European Union. Close to a Billion US Dollars have been spent by entities (mainly generators) in the Regional Greenhouse Gas Initiative in procuring CO 2 allowances to meet binding emissions restrictions. In the near future, there are expected to be significant impacts due to the cap-and-trade program, especially when the cap stringency increases. In this research we develop a bilevel, complete-information, matrix game-theoretic model to assess the economic impact and make operational decisions in carbon-constrained restructured electricity markets. Our model is solved using a reinforcement learning approach, which takes into account the learning and adaptive nature of market participants. Our model also accounts for all the power systems constraints via a DC-OPF problem. We demonstrate the working of the model and compute various economic impact indicators such as supply shares, cost pass-through, social welfare, profits, allowance prices, and electricity prices. Results from a 9-bus power network are presented.

  19. Multi-core fiber undersea transmission systems

    DEFF Research Database (Denmark)

    Nooruzzaman, Md; Morioka, Toshio

    2017-01-01

    Various potential architectures of branching units for multi-core fiber undersea transmission systems are presented. It is also investigated how different architectures of branching unit influence the number of fibers and those of inline components.......Various potential architectures of branching units for multi-core fiber undersea transmission systems are presented. It is also investigated how different architectures of branching unit influence the number of fibers and those of inline components....

  20. Research of pneumatic control transmission system for small irradiation samples

    International Nuclear Information System (INIS)

    Bai Zhongxiong; Zhang Haibing; Rong Ru; Zhang Tao

    2008-01-01

    In order to reduce the absorbed dose damage for the operator, pneumatic control has been adopted to realize the rapid transmission of small irradiation samples. On/off of pneumatic circuit and directions for the rapid transmission system are controlled by the electrical control part. The main program initializes the system and detects the location of the manual/automatic change-over switch, and call for the corresponding subprogram to achieve the automatic or manual operation. Automatic subprogram achieves the automatic sample transmission; Manual subprogram completes the deflation, and back and forth movement of the radiation samples. This paper introduces in detail the implementation of the system, in terms of both hardware and software design. (authors)

  1. Methods, apparatus, and systems for monitoring transmission systems

    Science.gov (United States)

    Polk, Robert E [Idaho Falls, ID; Svoboda, John M [Idaho Falls, ID; West, Phillip B [Idaho Falls, ID; Heath, Gail L [Iona, ID; Scott, Clark L [Idaho Falls, ID

    2010-08-31

    A sensing platform for monitoring a transmission system, and method therefor, may include a sensor that senses one or more conditions relating to a condition of the transmission system and/or the condition of an environment around the transmission system. A control system operatively associated with the sensor produces output data based on an output signal produced by the sensor. A transmitter operatively associated with the control system transmits the output data from the control system.

  2. Experimental Investigation of the Corona Discharge in Electrical Transmission due to AC/DC Electric Fields

    Directory of Open Access Journals (Sweden)

    Fuangpian Phanupong

    2016-01-01

    Full Text Available Nowadays, using of High Voltage Direct Current (HVDC transmission to maximize the transmission efficiency, bulk power transmission, connection of renewable power source from wind farm to the grid is of prime concern for the utility. However, due to the high electric field stress from Direct Current (DC line, the corona discharge can easily be occurred at the conductor surface leading to transmission loss. Therefore, the polarity effect of DC lines on corona inception and breakdown voltage should be investigated. In this work, the effect of DC polarity and Alternating Current (AC field stress on corona inception voltage and corona discharge is investigated on various test objects, such as High Voltage (HV needle, needle at ground plane, internal defect, surface discharge, underground cable without cable termination, cable termination with simulated defect and bare overhead conductor. The corona discharge is measured by partial discharge measurement device with high-frequency current transformer. Finally, the relationship between supply voltage and discharge intensity on each DC polarity and AC field stress can be successfully determined.

  3. APEnet+ 34 Gbps data transmission system and custom transmission logic

    International Nuclear Information System (INIS)

    Ammendola, R; Biagioni, A; Frezza, O; Lonardo, A; Cicero, F Lo; Paolucci, P S; Rossetti, D; Simula, F; Tosoratto, L; Vicini, P

    2013-01-01

    APEnet+ is a point-to-point, low-latency, 3D-torus network controller integrated in a PCIe Gen2 board based on the Altera Stratix IV FPGA. We characterize the transmission system (embedded transceivers driving external QSFP+ modules) analyzing signal integrity, throughput, latency, BER and jitter at different data rates up to 34 Gbps. We estimate the efficiency of a custom logic able to sustain 2.6 GB/s per link with an FPGA on-chip memory footprint of 40 KB, providing deadlock-free routing and systemic awareness of faults. Finally, we show the preliminary results obtained with the embedded transceivers of a next-generation FPGA and outline some ideas to increase the performance with the same FPGA memory footprint

  4. APEnet+ 34 Gbps data transmission system and custom transmission logic

    Energy Technology Data Exchange (ETDEWEB)

    Ammendola, R [INFN Sezione di Roma Tor Vergata, Via della Ricerca Scientifica, 1 - 00133 Roma Italy (Italy); Biagioni, A; Frezza, O; Lonardo, A; Cicero, F Lo; Paolucci, P S; Rossetti, D; Simula, F; Tosoratto, L; Vicini, P [INFN Sezione di Roma, P.le Aldo Moro, 2 - 00185 Roma Italy (Italy)

    2013-12-01

    APEnet+ is a point-to-point, low-latency, 3D-torus network controller integrated in a PCIe Gen2 board based on the Altera Stratix IV FPGA. We characterize the transmission system (embedded transceivers driving external QSFP+ modules) analyzing signal integrity, throughput, latency, BER and jitter at different data rates up to 34 Gbps. We estimate the efficiency of a custom logic able to sustain 2.6 GB/s per link with an FPGA on-chip memory footprint of 40 KB, providing deadlock-free routing and systemic awareness of faults. Finally, we show the preliminary results obtained with the embedded transceivers of a next-generation FPGA and outline some ideas to increase the performance with the same FPGA memory footprint.

  5. Mortality of persons resident in the vicinity of electricity transmission facilities

    Energy Technology Data Exchange (ETDEWEB)

    McDowall, M E

    1986-02-01

    Several studies have raised the possibility that exposure to electrical and/or magnetic fields may be injurious to health in particular by the promotion or initiation of cancer. To investigate whether the electricity transmission system presents a long term hazard to public health, the mortality of nearly 8,000 persons, identified as living in the vicinity of electrical transmission facilities at the time of the 1971 Population Census, has been followed to the end of 1983. All identified transmission installations within pre-defined areas were included in the study with the result that the greater part of the study group were believed to be resident near relatively low voltage sub-stations. Overall mortality was lower than expected and no evidence of major health hazards emerged. The only statistically significant excess mortality was for lung cancer (in women overall, and in persons living closest to the installations); this result is difficult to interpret in the absence of smoking data, and is not supported by other evidence but does not appear to be due to the social class distribution of the study group. The study did not support previously reported associations of exposure to electro-magnetic fields with acute myeloid leukaemia, other lymphatic cancers and suicide.

  6. 76 FR 44323 - National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of...

    Science.gov (United States)

    2011-07-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-49-000] National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of Petition for Declaratory Order Take..., 18 CFR 385.207, National Grid Transmission Services Corporation and Bangor Hydro Electric Company...

  7. 76 FR 37809 - The Connecticut Transmission Municipal Electric Energy Cooperative; Notice of Request for Waiver...

    Science.gov (United States)

    2011-06-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11-4-000] The Connecticut Transmission Municipal Electric Energy Cooperative; Notice of Request for Waiver or Exemption Take notice that on June 8, 2011, the Connecticut Transmission Municipal Electric Energy Cooperative filed a petition...

  8. Cost Allocation of Transmission Losses in Electric Market Mechanism

    Directory of Open Access Journals (Sweden)

    Erwin Dermawan

    2012-06-01

    Full Text Available This paper proposes a new method to calculate cost allocation of transmission losses (losses, based on a certain price of energy (i.e. a marginal price of system. Here is developed a mathematic model through manipulating of the network equation to separate losses. This model uses complex power injection and, does not use approximations and assumptions in determining the cost allocation of losses. Its calculation begins from the results of load flow calculation and then is continued to calculate power distribution from a generator to every load and every line. Finally, to be calculated separating of losses and cost allocation of losses. The proposed method is easy to be understood and applied. An illustration results on IEEE 14-bus system show that the method is always consistent with expectancies and somewhat different with a few reference methods.

  9. A GIS-based Power Transmission Management Information System

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    <正>Based on analyzing the shortcomings of electric power enterprise in traditional operation pattern,this paper combines components GIS with the application of management information system,and uses the structure which unifies three layers C/S and B/S.Also,proposed using the GPS intellectualization patrol.This may be useful to guarantees the transmission line’s operation to be safe and stable.

  10. Vehicle electrical system state controller

    Science.gov (United States)

    Bissontz, Jay E.

    2017-10-17

    A motor vehicle electrical power distribution system includes a plurality of distribution sub-systems, an electrical power storage sub-system and a plurality of switching devices for selective connection of elements of and loads on the power distribution system to the electrical power storage sub-system. A state transition initiator provides inputs to control system operation of switching devices to change the states of the power distribution system. The state transition initiator has a plurality of positions selection of which can initiate a state transition. The state transition initiator can emulate a four position rotary ignition switch. Fail safe power cutoff switches provide high voltage switching device protection.

  11. Are the British electricity trading and transmission arrangements future-proof?

    International Nuclear Information System (INIS)

    Green, Richard

    2010-01-01

    In Great Britain, electricity is traded in an energy-only market that relies upon bilateral trading until shortly before real time. The GB System Operator also uses bilateral trading to respond to changes in demand and generation and resolve transmission constraints. Prices are not explicitly spatial, although well-placed generators can charge the system operator more for their output. This paper argues that these arrangements are not well-suited for the challenges of accommodating nearly thirty percent of intermittent wind generation, often located far from demand. The market design already implemented in the north-eastern United States is likely to be more efficient. (author)

  12. Terminological dictionary of electrical power industry in range of generation, transmission and distribution of electric energy

    International Nuclear Information System (INIS)

    Biernacki, T.; Cegla, S.; Ciszewski, W.

    1990-08-01

    The dictionary contains about 5000 terms about conventional and nuclear power plants, energy sources, transmission lines, automation, power systems, environment protection, statistics etc. Each term is given with definition and its equivalents in English, French, German and Russian. Indexes of Polish, English, French, German and Russian terms are provided at the back of dictionary. (A.S.)

  13. Structural vulnerability in transmission systems: Cases of Colombia and Spain

    International Nuclear Information System (INIS)

    Correa, Gabriel J.; Yusta, José M.

    2014-01-01

    Highlights: • Vulnerability analysis of transmission electric systems in Colombia and Spain. • Based on scale-free graph statistic indexes. • Evaluating both current conditions and expansion plans of infrastructures. • Comparison of random error and deliberate attack tolerance evaluation. - Abstract: In this paper the authors apply methodological strategies for the structural vulnerability assessment in high voltage power networks based upon the combination of power flow models and scale-free graph statistic indexes. Thus, it is possible to study risk scenarios based on events that may trigger cascading failures within a power system. The usefulness of graph theory techniques has been validated on previous works of the authors, and may be applied in analysis of the vulnerability of different power electric networks. A case study for vulnerability analysis is carried out through methodologies that allow comparison on random error and deliberate attack tolerance evaluation in transmission electric systems from countries like Colombia and Spain. Such vulnerability assessment methodology takes into account the current conditions of the power networks (base case), as well as the impact of expansion plans into infrastructures as defined by their governments. Consequently, the authors show the advantage on the use of graph theory based techniques for vulnerability analysis of electrical power systems

  14. Transmission dispatch and congestion management in open market systems

    Science.gov (United States)

    Fang, Risheng

    This thesis is located in the domain of electricity supply industry restructuring. It deals with emerging issues, whose understanding is essential to advancing knowledge of open access transmission theory and proceeds to develop approaches for solving the transmission dispatch and congestion management problem. An overview of current trends and experiences in utility restructuring and the main models for restructuring, as well as the classifications of system operators, is first presented. A fully unbundled competitive electricity market model, called the bilateral/multilateral trades model, is then developed. A survey of current research in transmission dispatch and congestion management is included with discussion of transmission capacity and ancillary services. A methodology for the power dispatch problem in a structure dominated by bilateral and multilateral transmission contracts is presented. Group structures are mathematically formulated and explored and three basic types of curtailment strategies proposed for use by market participants. A more complex model is then developed, which takes into account the co-existence of bilateral and multilateral contracts with pool type dynamic supplies and demands based on bids and market clearing prices. An integrated dispatch strategy to reconcile all three types of transactions (bilateral, multilateral and pool) is then developed. Prioritization of electricity transactions and related curtailment strategies are explored and a mechanism for coordination between market participants to achieve additional economic advantages is described. A theory of security based rescheduling is presented in order to investigate the security-related aspects of operation in an unbundled and deregulated system. The impact of post-contingency corrective capability on optimal rescheduling results has been identified and the advantage of incorporating post-contingency corrective rescheduling into the objective function demonstrated. Finally

  15. Green electricity: Tracking systems for environmental disclosure

    Energy Technology Data Exchange (ETDEWEB)

    Biewald, B.E.; Ramey, J.A. [Synapse Energy Economics, Inc., Cambridge, MA (United States)

    1997-12-31

    For the first time, electricity consumers in the US are beginning to choose their generation providers. One of the opportunities created by the introduction of retail choice in electricity is the chance for customers to influence the mix of generating resources through their purchasing decisions. Some environmentally aware consumers will want {open_quotes}clean,{close_quotes} {open_quotes}green,{close_quotes} or renewable power. While some suppliers will attempt to differentiate themselves according to their environmental performance, such claims for green electricity can be particularly difficult to verify given the complexity of the interconnected electric system. Because electricity is delivered over an integrated transmission grid and kilowatt-hours at the point of retail sale are indistinguishable from each other; disclosure requires tracking protocols to attribute generation at power plants to sales at the customers` meters. Fortunately, it is possible to implement a workable disclosure system. Some states have already included disclosure requirements in their electric industry restructuring orders and legislation. In this paper, a set of design criteria for an environmental disclosure system are presented along with two methods for disclosure: the company approach and the product approach. In addition, the authors discuss of power pools, data availability issues, and propose a company-based disclosure system using a {open_quotes}wholesale sales first{close_quotes} approach to transaction accounting.

  16. Impacts of rising air temperatures on electric transmission ampacity and peak electricity load in the United States

    Science.gov (United States)

    Bartos, Matthew; Chester, Mikhail; Johnson, Nathan; Gorman, Brandon; Eisenberg, Daniel; Linkov, Igor; Bates, Matthew

    2016-11-01

    Climate change may constrain future electricity supply adequacy by reducing electric transmission capacity and increasing electricity demand. The carrying capacity of electric power cables decreases as ambient air temperatures rise; similarly, during the summer peak period, electricity loads typically increase with hotter air temperatures due to increased air conditioning usage. As atmospheric carbon concentrations increase, higher ambient air temperatures may strain power infrastructure by simultaneously reducing transmission capacity and increasing peak electricity load. We estimate the impacts of rising ambient air temperatures on electric transmission ampacity and peak per-capita electricity load for 121 planning areas in the United States using downscaled global climate model projections. Together, these planning areas account for roughly 80% of current peak summertime load. We estimate climate-attributable capacity reductions to transmission lines by constructing thermal models of representative conductors, then forcing these models with future temperature projections to determine the percent change in rated ampacity. Next, we assess the impact of climate change on electricity load by using historical relationships between ambient temperature and utility-scale summertime peak load to estimate the extent to which climate change will incur additional peak load increases. We find that by mid-century (2040-2060), increases in ambient air temperature may reduce average summertime transmission capacity by 1.9%-5.8% relative to the 1990-2010 reference period. At the same time, peak per-capita summertime loads may rise by 4.2%-15% on average due to increases in ambient air temperature. In the absence of energy efficiency gains, demand-side management programs and transmission infrastructure upgrades, these load increases have the potential to upset current assumptions about future electricity supply adequacy.

  17. Transmission Integration | Grid Modernization | NREL

    Science.gov (United States)

    Transmission Integration Transmission Integration The goal of NREL's transmission integration integration issues and provide data, analysis, and models to enable the electric power system to more and finding solutions to address them to enable transmission grid integration. Capabilities Power

  18. Microwave transmission system for space power

    Energy Technology Data Exchange (ETDEWEB)

    Dickinson, R M [Jet Propulsion Lab., Pasadena, Calif. (USA)

    1976-09-01

    A small total system model and a large subsystem element similar to those that could be eventually used for wireless power transmission experiments in space have been successfully demonstrated by NASA. The short range, relatively low-power laboratory system achieved a dc-to-dc transmission efficiency of 54%. A separate high-power-level receiving subsystem, tested over a 1.54-km range at Goldstone, California, has achieved the transportation of over 30 kW of dc output power. Both tests used 12-cm wave-length microwaves.

  19. An Optimal Domestic Electric Vehicle Charging Strategy for Reducing Network Transmission Loss While Taking Seasonal Factors into Consideration

    Directory of Open Access Journals (Sweden)

    Yuancheng Zhao

    2018-01-01

    Full Text Available With the rapid growth of domestic electric vehicle charging loads, the peak-valley gap and power fluctuation rate of power systems increase sharply, which can lead to the increase of network losses and energy efficiency reduction. This paper tries to regulate network loads and reduce power system transmission loss by optimizing domestic electric vehicle charging loads. In this paper, a domestic electric vehicle charging loads model is first developed by analyzing the key factors that can affect users’ charging behavior. Subsequently, the Monte Carlo method is proposed to simulate the power consumption of a cluster of domestic electric vehicles. After that, an optimal electric vehicle charging strategy based on the 0-1 integer programming is presented to regulate network daily loads. Finally, by taking the IEEE33 distributed power system as an example, this paper tries to verify the efficacy of the proposed optimal charging strategy and the necessity for considering seasonal factors when scheduling electric vehicle charging loads. Simulation results show that the proposed 0-1 integer programming method does have good performance in reducing the network peak-valley gap, voltage fluctuation rate, and transmission loss. Moreover, it has some potential to further reduce power system transmission loss when seasonal factors are considered.

  20. Integration of new nuclear power plants into transmission grids part I: Transmission system issues

    International Nuclear Information System (INIS)

    Abi-Samra, N.

    2008-01-01

    Integration of new nuclear plants into a transmission system is a two sided problem. On one side, adding the nuclear plant into an existing grid will change the attributes of that grid: e.g., loading of certain transmission lines will increase; voltages will be affected, etc. On the other side, the grid itself will affect the plant, and the plant needs to be designed to accommodate the specifics of the grid. Based on that, this paper is divided into two parts. Part I addresses the grid issues with the integration of the new plant, with emphasis on the electrical aspects of these issues. Part II of this paper, concentrates on the vulnerability of the plant from grid disturbances. Part II reintroduces a relatively new concept by this author called the Zone of Vulnerability (ZoV) for the new nuclear plants. (authors)

  1. International benchmarking of electricity transmission by regulators: A contrast between theory and practice?

    International Nuclear Information System (INIS)

    Haney, Aoife Brophy; Pollitt, Michael G.

    2013-01-01

    Benchmarking of electricity networks has a key role in sharing the benefits of efficiency improvements with consumers and ensuring regulated companies earn a fair return on their investments. This paper analyses and contrasts the theory and practice of international benchmarking of electricity transmission by regulators. We examine the literature relevant to electricity transmission benchmarking and discuss the results of a survey of 25 national electricity regulators. While new panel data techniques aimed at dealing with unobserved heterogeneity and the validity of the comparator group look intellectually promising, our survey suggests that they are in their infancy for regulatory purposes. In electricity transmission, relative to electricity distribution, choosing variables is particularly difficult, because of the large number of potential variables to choose from. Failure to apply benchmarking appropriately may negatively affect investors’ willingness to invest in the future. While few of our surveyed regulators acknowledge that regulatory risk is currently an issue in transmission benchmarking, many more concede it might be. In the meantime new regulatory approaches – such as those based on tendering, negotiated settlements, a wider range of outputs or longer term grid planning – are emerging and will necessarily involve a reduced role for benchmarking. -- Highlights: •We discuss how to benchmark electricity transmission. •We report survey results from 25 national energy regulators. •Electricity transmission benchmarking is more challenging than benchmarking distribution. •Many regulators concede benchmarking may raise capital costs. •Many regulators are considering new regulatory approaches

  2. Rényi entropies of electrical transmission lines with Fibonacci distribution of inductances

    Energy Technology Data Exchange (ETDEWEB)

    Lazo, E., E-mail: elazo@uta.cl [Departamento de Física, Facultad de Ciencias, Universidad de Tarapacá, Arica (Chile); Mellado, F. [Departamento de Física, Facultad de Ciencias, Universidad de Tarapacá, Arica (Chile); Escuela Universitaria de Ingeniería Eléctrica-Electrónica, Universidad de Tarapacá, Arica (Chile); Saavedra, E. [Departamento de Física, Facultad de Ciencias, Universidad de Tarapacá, Arica (Chile)

    2012-10-01

    We study classical dual transmission lines with constant capacitances C{sub j}=C{sub 0}, ∀j, when we distribute two inductance values L{sub A} and L{sub B} according to the Fibonacci sequence. Using the electric current function I{sub j}(ω), we study the normalized localization length Λ(ω), the Rényi entropies R{sub m}(ω) and the normalized information length β(ω). We found three kinds of behavior of the I{sub j}(ω) function: localized, extended and intermediate. In addition, it is found that the transmission line with Fibonacci distribution of inductances shows a behavior characteristic of quasi-periodic systems, namely, a self-similar frequency spectrum, where each subband is divided into three subbands, but the number of global subbands is greater than four.

  3. Transmission of prices and price volatility in Australian electricity spot markets: a multivariate GARCH analysis

    International Nuclear Information System (INIS)

    Worthington, A.; Kay-Spratley, A.; Higgs, H.

    2005-01-01

    This paper examines the transmission of spot electricity prices and price volatility among the five regional electricity markets in the Australian National Electricity Market: namely, New South Wales, Queensland, South Australia, the Snowy Mountains Hydroelectric Scheme and Victoria. A multivariate generalised autoregressive conditional heteroskedasticity model is used to identify the source and magnitude of price and price volatility spillovers. The results indicate the presence of positive own mean spillovers in only a small number of markets and no mean spillovers between any of the markets. This appears to be directly related to the physical transfer limitations of the present system of regional interconnection. Nevertheless, the large number of significant own-volatility and cross-volatility spillovers in all five markets indicates the presence of strong autoregressive conditional heteroskedasticity and generalised autoregressive conditional heteroskedasticity effects. This indicates that shocks in some markets will affect price volatility in others. Finally, and contrary to evidence from studies in North American electricity markets, the results also indicate that Australian electricity spot prices are stationary. (author)

  4. A surface acoustic wave electric field strength meter for environmental studies of HV transmission lines

    International Nuclear Information System (INIS)

    Grandolfo, M.; Ranghiasci, C.; Verona, E.

    1988-01-01

    In recent years, there has been a significant increase in concern over the health and safety aspects of high voltage transmission lines (HVTL). The majority of research has focused on effects directly or indirectly involved with the central nervous system, including physiological, ultrastructural, and biochemical alterations, changes in blood composition, behaviour, reproduction, and development. Several recent epidemiological reports have presented preliminary data suggesting an increase in the incidence of cancer among children and adults exposed to magnetic fields through living close to various types of electrical power lines or devices. With the increase in environmental concerns there has been a concomitant consideration of biological effects and health implications related to presently existing HVTL and those planned in the future. It was concluded that the electric and magnetic field strengths and the electrical discharges are the most important electrophysical factors. Thus, it has been deemed necessary to develop measuring means to determine the field strengths in areas surrounding electric installations, in particular at ground level. In the present paper an electric field meter, based on the use of a surface acoustic wave (SAW) delay line, is presented and the experimental results obtained are discussed

  5. Line Capacity Expansion and Transmission Switching in Power Systems With Large-Scale Wind Power

    DEFF Research Database (Denmark)

    Villumsen, Jonas Christoffer; Bronmo, Geir; Philpott, Andy B.

    2013-01-01

    In 2020 electricity production from wind power should constitute nearly 50% of electricity demand in Denmark. In this paper we look at optimal expansion of the transmission network in order to integrate 50% wind power in the system, while minimizing total fixed investment cost and expected cost...... of power generation. We allow for active switching of transmission elements to reduce congestion effects caused by Kirchhoff's voltage law. Results show that actively switching transmission lines may yield a better utilization of transmission networks with large-scale wind power and increase wind power...

  6. On Long-Term Transmission Rights in the Nordic Electricity Markets

    Directory of Open Access Journals (Sweden)

    Petr Spodniak

    2017-03-01

    Full Text Available In vein with the new energy market rules drafted in the EU this paper presents and discusses two contract types for hedging the risks connected to long-term transmission rights, the financial transmission right (FTR and the electricity price area differentials (EPAD that are used in the Nordic electricity markets. The possibility to replicate the FTR contracts with a combination of EPAD contracts is presented and discussed. Based on historical evidence and empirical analysis of ten Nordic interconnectors and twenty bidding areas, we investigate the pricing accuracy of the replicated FTR contracts by quantifying ex-post forward risk premia. The results show that the majority of the studied FTR contain a negative risk premium, especially the monthly and the quarterly contracts. Reverse flow (unnatural pricing was identified for two interconnectors. From a theoretical policy point of view the results imply that it may be possible to continue with the EPAD-based system by using EPAD Combos in the Nordic countries, even if FTR contracts would prevail elsewhere in the EU. In practice the pricing of bi-directional EPAD contracts is more complex and may not always be very efficient. The efficiency of the EPAD market structure should be discussed from various points of view before accepting their status quo as a replacement for FTRs in the Nordic electricity markets.

  7. Benchmarking European Gas Transmission System Operators

    DEFF Research Database (Denmark)

    Agrell, Per J.; Bogetoft, Peter; Trinkner, Urs

    This is the final report for the pan-European efficiency benchmarking of gas transmission system operations commissioned by the Netherlands Authority for Consumers and Markets (ACM), Den Haag, on behalf of the Council of European Energy Regulators (CEER) under the supervision of the authors....

  8. 40 Gb/s optical transmission systems

    DEFF Research Database (Denmark)

    Buxens Azcoaga, Alvaro Juan; Nielsen, Steen Krogh

    2003-01-01

    ; chromatic dispersion, Polarization Mode Dispersion (PMD), Self Phase Modulation (SPM) and linear or non-linear crosstalk among others. Regarding chromatic dispersion, sufficient evidence is presented for the need in 40 Gb/s systems of either modulation formats that allow for higher tolerance than....... Using a 9 ps pulsed RZ Tx, transmission is achieved over a 400 km link consisting of 5 spans of 80 km standard-SMF with a Quality (Q) factor of 17.7 dB, while for NRZ it is reduced to 15 dB. In another experimental verification over 40 km spans of standard-SMF, we could achieve transmission over 6 spans...

  9. Transmission Quality Measurements in DAB+ Broadcast System

    Directory of Open Access Journals (Sweden)

    Gilski Przemysław

    2017-12-01

    Full Text Available In the age of digital media, delivering broadcast content to customers at an acceptable level of quality is one of the most challenging tasks. The most important factor is the efficient use of available resources, including bandwidth. An appropriate way of managing the digital multiplex is essential for both the economic and technical issues. In this paper we describe transmission quality measurements in the DAB+ broadcast system. We provide a methodology for analysing parameters and factors related with the efficiency and reliability of a digital radio link. We describe a laboratory stand that can be used for transmission quality assessment on a regional and national level.

  10. The electricity certificate system, 2007

    Energy Technology Data Exchange (ETDEWEB)

    2007-07-01

    The electricity certificate system is a market based support system to assist the expansion of electricity production in Sweden from renewable energy sources and peat. Its objective is to increase the production of electricity from such sources by 17 TWh by 2016 relative to the production level in 2002. It is part of the country's overall objective of moving Sweden towards a more ecologically sustainable energy system. This report describes the market status of the electricity certificate system, and includes statistics from 2003 to 2006. It is our aim to create a forum for continuously developing the statistical material and analyses, in order to assist those involved in the market, and all other interested persons, to follow achievement of the objectives set out in the Government's Bill No. 2005/06:154, Renewable Electricity with Green Certificates. It is also our aim that, in future, each issue of the report should include a more in depth theme article on some particular subject. This year the report provides expanded information and statistics on wind power. Electricity certificates are issued to those who produce electricity from various renewable energy sources, and from peat, and who have had their production plants approved by the Swedish Energy Agency. To date, certificates have been issued to producers of electricity from biofuels and peat, wind power, hydro power and solar energy. Production from the renewable sources amounted to 11.6 TWh in 2006, which is 5.1 TWh more than corresponding production in 2002

  11. Planning Electric Transmission Lines: A Review of Recent Regional Transmission Plans

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-04-13

    The first Quadrennial Energy Review (QER) recommends that the U.S. Department of Energy (DOE) conduct a national review of transmission plans and assess the barriers and incentives to their implementation. DOE tasked Lawrence Berkeley National Laboratory (LBNL) to prepare two reports to support the agency’s response to this recommendation. This report reviews regional transmission plans and regional transmission planning processes that have been directed by Federal Energy Regulatory Commission (FERC) Order Nos. 890 and 1000. We focus on the most recent regional transmission plans (those issued in 2015 and through approximately mid-year 2016) and current regional transmission planning processes. A companion report focuses on non-plan-related factors that affect transmission projects.

  12. Electricity transmission pricing: Tracing based point-of-connection tariff

    International Nuclear Information System (INIS)

    Abhyankar, A.R.; Khaparde, S.A.

    2009-01-01

    Point-of-connection (POC) scheme of transmission pricing in decentralized markets charges the participants a single rate per MW depending on their point-of-connection. Use of grossly aggregated postage stamp rates as POC charges fails to provide appropriate price signals. The POC tariff based on distribution of network sunk costs by employing conventional tracing assures recovery of sunk costs based on extent of use of network by participants. However, the POC tariff by this method does not accommodate economically efficient price signals which correspond to marginal costs. On the other hand, the POC tariff, if made proportional to marginal costs alone, fails to account for sunk costs and extent of use of network. This paper overcomes these lacunae by combining the above stated desired objectives under the recently proposed optimal tracing framework. Since real power tracing problem is amenable to multiple solutions, it is formulated as linearly constrained optimization problem. By employing this methodology, consideration of extent of network use and sunk cost recovery are guaranteed, while objective function is designed such that the spatial pattern of price signals closely follows the pattern of scaled locational marginal prices. The methodology is tested on IEEE 30 bus system, wherein average power flow pattern is established by running various simulation states on congested and un-congested network conditions. (author)

  13. Measuring the competitiveness benefits of a transmission investment policy: The case of the Alberta electricity market

    International Nuclear Information System (INIS)

    Wolak, Frank A.

    2015-01-01

    Transmission expansions can increase the extent of competition faced by wholesale electricity suppliers with the ability to exercise unilateral market power. This can cause them to submit offer curves closer to their marginal cost curves, which sets market-clearing prices closer to competitive benchmark price levels. These lower wholesale market-clearing prices are the competitiveness benefit consumers realize from the transmission expansion. This paper quantifies empirically the competitiveness benefits of a transmission expansion policy that causes strategic suppliers to expect no transmission congestion. Using hourly generation-unit level offer, output, market-clearing price and congestion data from the Alberta wholesale electricity market from January 1, 2009 to July 31, 2013, an upper and lower bound on the hourly consumer competitiveness benefits of this transmission policy is computed. Both of these competitiveness benefits measures are economically significant, which argues for including them in transmission planning processes for wholesale electricity markets to ensure that all transmission expansions with positive net benefits to electricity consumers are undertaken. -- Highlights: •Define competitiveness benefits to consumers from transmission expansions in wholesale market. •Compute upper and lower bounds on competitiveness benefits for Alberta market. •Compare no-perceived congestion prices to actual prices to measure competitiveness benefits. •Economically substantial competitiveness benefits found for sample period studied. •To ensure adequate transmission, planning processes should account for these benefits

  14. Proximity effects of high voltage electric power transmission lines on ...

    African Journals Online (AJOL)

    Yomi

    2010-08-18

    Aug 18, 2010 ... transmission lines on ornamental plant growth. Zeki Demir ... The effects of proximity to power-line on specific leaf area and seedling dbh were tested .... during vegetation season is about 72% and common wind blow.

  15. Guinea_WADC00320_ADBG_Guinea_Electricity_Transmission_Network

    Data.gov (United States)

    United Nations Cartographic Section — Data for medium and high voltage transmission lines were compiled for the AICD study led by the World Bank. A variety of sources were consulted, including regional...

  16. A comprehensive approach for computation and implementation of efficient electricity transmission network charges

    Energy Technology Data Exchange (ETDEWEB)

    Olmos, Luis; Perez-Arriaga, Ignacio J. [Instituto de Investigacion Tecnologica, Universidad Pontificia Comillas, Alberto Aguilera, 23, 28015 Madrid (Spain)

    2009-12-15

    This paper presents a comprehensive design of electricity transmission charges that are meant to recover regulated network costs. In addition, these charges must be able to meet a set of inter-related objectives. Most importantly, they should encourage potential network users to internalize transmission costs in their location decisions, while interfering as least as possible with the short-term behaviour of the agents in the power system, since this should be left to regulatory instruments in the operation time range. The paper also addresses all those implementation issues that are essential for the sound design of a system of transmission network charges: stability and predictability of the charges; fair and efficient split between generation and demand charges; temporary measures to account for the low loading of most new lines; number and definition of the scenarios to be employed for the calculation and format of the final charges to be adopted: capacity, energy or per customer charges. The application of the proposed method is illustrated with a realistic numerical example that is based on a single scenario of the 2006 winter peak in the Spanish power system. (author)

  17. Network Theory Integrated Life Cycle Assessment for an Electric Power System

    Directory of Open Access Journals (Sweden)

    Heetae Kim

    2015-08-01

    Full Text Available In this study, we allocate Greenhouse gas (GHG emissions of electricity transmission to the consumers. As an allocation basis, we introduce energy distance. Energy distance takes the transmission load on the electricity energy system into account in addition to the amount of electricity consumption. As a case study, we estimate regional GHG emissions of electricity transmission loss in Chile. Life cycle assessment (LCA is used to estimate the total GHG emissions of the Chilean electric power system. The regional GHG emission of transmission loss is calculated from the total GHG emissions. We construct the network model of Chilean electric power grid as an undirected network with 466 nodes and 543 edges holding the topology of the power grid based on the statistical record. We analyze the total annual GHG emissions of the Chilean electricity energy system as 23.07 Mt CO2-eq. and 1.61 Mt CO2-eq. for the transmission loss, respectively. The total energy distance for the electricity transmission accounts for 12,842.10 TWh km based on network analysis. We argue that when the GHG emission of electricity transmission loss is estimated, the electricity transmission load should be separately considered. We propose network theory as a useful complement to LCA analysis for the complex allocation. Energy distance is especially useful on a very large-scale electric power grid such as an intercontinental transmission network.

  18. Imports, exports, and Alberta's transmission system impact on price fluctuation

    International Nuclear Information System (INIS)

    Johnson, K.

    2002-01-01

    The roles, responsibilities and objectives of ESBI, a private for-profit company, appointed by the Alberta Government to be the Independent Transmission Administrator in the province, is sketched, prior to a discussion of price volatility in electricity, Alberta interconnections, intertie issues, the economic theory and the reality impact on prices. Given that imports and exports constitute a relatively small proportion of total generation or load in Alberta, price volatility is considered to have been only minimally affected by imports/exports. In contrast, transmission constraints, i.e. the limits on physical capacity of the existing transmission system to accommodate all desired transactions, have significant impact on imports/exports. Factors underlying constraints and price volatility such as uncertainty of generation dispatch, leading to reduced interest to invest, which in turn leads to scarce capacity for imports/exports, and the actions required to reduce uncertainty and address other issues such as congestion management, tariff design and the creation of regional transmission organizations, are also discussed to provide further clarification of the issues. It is suggested that these and other related issues need to be resolved to provide the clarity around transmission access and the tools required to manage price fluctuations

  19. Radio transmission system for industrial area

    International Nuclear Information System (INIS)

    Iliescu, M.; Culcer, M.; Curuia, M.; Anghel, N.M.; Stefanescu, I.

    2003-01-01

    The paper deals with a data transmission system operating in a large, noisy industrial area. The radio transmission system permits data and commands communication between the local units of collecting data and a central monitoring and/or command station ( dispatch). The communication support are radio waves in the range 450 MHz. The transducers are of transmitter type, with 4-20 mA output signal, providing information about environmental and/or work parameters. Data are primarily acquisitioned in a data logger with microcontroller, then transmitted via a FSK radio modem and a radio station to the dispatch. Data logger can also be connected in a network. The dispatch personal computer receives and processes data and transmits commands. The system functioning is supervised by a communication software in MCS - 51 assembler and an application software in Visual C ++ . (author)

  20. The Effects of Average Revenue Regulation on Electricity Transmission Investment and Pricing

    OpenAIRE

    Isamu Matsukawa

    2005-01-01

    This paper investigates the long-run effects of average revenue regulation on an electricity transmission monopolist who applies a two- part tariff comprising a variable congestion price and a non-negative fixed access fee. A binding constraint on the monopolist fs expected average revenue lowers the access fee, promotes transmission investment, and improves consumer surplus. In a case of any linear or log-linear electricity demand function with a positive probability that no congestion occur...

  1. Transmission techniques for 4G systems

    CERN Document Server

    Da Silva, Mario Marques

    2012-01-01

    Fourth Generation (4G) wireless communication systems support current and emergent multimedia services such as mobile TV, social networks and gaming, high-definition TV, video teleconferencing, and messaging services. These systems feature the All-over-IP concept and boast improved quality of service. Several important R&D activities are currently under way in the field of wireless communications for 4G systems, but the coverage is widespread in the literature. Transmission Techniques for 4G Systems presents a compilation of the latest developments in the field of wireless communications for 4

  2. Data Acquisition and Transmission System for Building Energy Consumption Monitoring

    Directory of Open Access Journals (Sweden)

    Liang Zhao

    2013-01-01

    Full Text Available Building energy consumption monitoring and management system have been developed widely in China in order to gain the real-time data of energy consumption in buildings for analyzing it in the next state work. This paper describes a low-cost and small-sized collector based on the STM32 microcontroller, which can be placed in a building easily to implement the work of data acquisition, storage, and transmission. The collector gathers the electricity, water, heat, and energy consumption data through the RS485 field bus and stores the data into an SD card with mass storage, finally, using Internet to finish the communication and transmission to data server through TCP protocol. The collector has been used in application for two years, and the results show that the system is reliable and stable.

  3. Transmission cost minimization strategies for wind-electric generating facilities

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez, R. [Northern States Power Company, Minneapolis, MN (United States)

    1997-12-31

    Integrating wind-electric generation facilities into existing power systems presents opportunities not encountered in conventional energy projects. Minimizing outlet cost requires probabilistic value-based analyses appropriately reflecting the wind facility`s operational characteristics. The wind resource`s intermittent nature permits relaxation of deterministic criteria addressing outlet configuration and capacity required relative to facility rating. Equivalent capacity ratings of wind generation facilities being a fraction of installed nameplate rating, outlet design studies contingency analyses can concentrate on this fractional value. Further, given its non-dispatchable, low capacity factor nature, a lower level of redundancy in outlet facilities is appropriate considering the trifling contribution to output unreliability. Further cost reduction opportunities arise from {open_quotes}wind speed/generator power output{close_quotes} and {open_quotes}wind speed/overhead conductor rating{close_quotes} functions` correlation. Proper analysis permits the correlation`s exploitation to safely increase line ratings. Lastly, poor correlation between output and utility load may permit use of smaller conductors, whose higher (mostly off-peak) losses are economically justifiable.

  4. Electrical power system integrated thermal/electrical system simulation

    International Nuclear Information System (INIS)

    Freeman, W.E.

    1992-01-01

    This paper adds thermal properties to previously developed electrical Saber templates and incorporates these templates into a functional Electrical Power Subsystem (EPS) simulation. These combined electrical and thermal templates enable the complete and realistic simulation of a vehicle EPS on-orbit. Applications include on-orbit energy balance determinations for system load changes, initial array and battery EPS sizing for new EPS development, and array and battery technology trade studies. This effort proves the versatility of the Saber simulation program in handling varied and complex simulations accurately and in a reasonable amount of computer time. 9 refs

  5. 75 FR 43519 - Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No...

    Science.gov (United States)

    2010-07-26

    ... DEPARTMENT OF ENERGY Western Area Power Administration Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No. 5 Substation and the Palo Verde Hub AGENCY... Department of Energy (DOE), is requesting SOIs from entities that are interested in purchasing transmission...

  6. Intelligent Electric Power Systems with Active-Adaptive Electric Networks: Challenges for Simulation Tools

    Directory of Open Access Journals (Sweden)

    Ufa Ruslan A.

    2015-01-01

    Full Text Available The motivation of the presented research is based on the needs for development of new methods and tools for adequate simulation of intelligent electric power systems with active-adaptive electric networks (IES including Flexible Alternating Current Transmission System (FACTS devices. The key requirements for the simulation were formed. The presented analysis of simulation results of IES confirms the need to use a hybrid modelling approach.

  7. Electric power system basics for the nonelectrical professional

    CERN Document Server

    Blume, Steven W

    2016-01-01

    The second edition of Steven W. Blume’s bestseller provides a comprehensive treatment of power technology for the non-electrical engineer working in the electric power industry. This book aims to give non-electrical professionals a fundamental understanding of large interconnected electrical power systems, better known as the “Power Grid”, with regard to terminology, electrical concepts, design considerations, construction practices, industry standards, control room operations for both normal and emergency conditions, maintenance, consumption, telecommunications and safety. The text begins with an overview of the terminology and basic electrical concepts commonly used in the industry then it examines the generation, transmission and distribution of power. Other topics discussed include energy management, conservation of electrical energy, consumption characteristics and regulatory aspects to help readers understand modern electric power systems.

  8. The electricity certificate system, 2008

    Energy Technology Data Exchange (ETDEWEB)

    2008-07-01

    The electricity certificate system is now in its sixth year. Since the start, both the system and the market have developed, and have undergone a number of changes. In January 2007, the Swedish Energy Agency published a report on the system, 'The electricity certificate system, 2006', to provide easily accessible information on the development of the system and to improve general understanding of it. With the passing of another year, it is now time for the third edition, 'The electricity certificate system, 2008', describing the market status of the electricity certificate system, with statistics from 2003 to 2007. This year's special theme chapter describes current support systems for renewable electricity production throughout the EU. The report also contains expanded information and statistics on biofuels, together with a new chapter that describes planned expansion of renewable electricity production up to 2012. The chapter on consumers' contribution to renewable electricity production has also been updated. A new feature this year is provided in the form of a number of tables at the end of the report, complementing the text. Through annual publication of the report, we hope to create a means of continuously developing the statistical material and analyses, in order to assist those involved in the market, and all other interested persons, to follow achievement of the objectives set out in the Government's Bill No. 205/06:154, 'Renewable electricity with green certificates'. We welcome views on the content and presentation of the report in order further to improve it. The target for the certificate system is to increase, by 2016, the annual production of electricity from renewable sources by 17 TWh relative to its production in 2002. So far, the actual production of renewable electricity is less than the indicative stage target for 2007. Nevertheless, progress is regarded as good, as there are many planned projects

  9. Proposed TFTR electrical system

    International Nuclear Information System (INIS)

    Bronner, G.; Murray, J.

    1975-01-01

    The development of controlled thermonuclear fusion has progressed to the stage where the present facilities and energy available for future devices are not sufficient and must be increased by about a factor of ten. This report describes the proposed TFTR ac utility power distribution system, an energy storage motor generator flywheel facility, and the rectifier conversion equipment for the Toroidal Field Confining System (TF), Ohmic Heating System (OH), Equilibrium Field System (EF) and the Neutral Beam Heating System (NB). The general requirements are described and the special design considerations identified

  10. Non-Contact Magnetic Transmission For Hybrid/Electric Rotorcraft, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Electric propulsion has the potential to revolutionize aircraft design and architecture. A distributed electric propulsion system for a VTOL aircraft can exploit...

  11. Electric Power Generation, Transmission and Distribution (NAICS 2211)

    Science.gov (United States)

    Find EPA regulatory information for electrical utilities, including coal-fired power plants. Includes links to NESHAPs for RICE, stationary combustion engines, fossil fuel waste, cooling water, effluent guidelines. Find information on the MATS rule.

  12. How dangerous are mobile phones, transmission masts, and electricity pylons?

    OpenAIRE

    Wood, A W

    2006-01-01

    Electrical power and mobile communications deliver enormous benefit to society, but there are concerns whether the electric and magnetic field (EMF) emissions associated with the delivery of this benefit are linked to cancer or other health hazards. This article reviews the strength of the available epidemiological and laboratory evidence and notes that this falls short of what is normally required to establish a causal link. However, because of scientific uncertainty a cautious approach is o...

  13. Sound transmission reduction with intelligent panel systems

    Science.gov (United States)

    Fuller, Chris R.; Clark, Robert L.

    1992-01-01

    Experimental and theoretical investigations are performed of the use of intelligent panel systems to control the sound transmission and radiation. An intelligent structure is defined as a structural system with integrated actuators and sensors under the guidance of an adaptive, learning type controller. The system configuration is based on the Active Structural Acoustic Control (ASAC) concept where control inputs are applied directly to the structure to minimize an error quantity related to the radiated sound field. In this case multiple piezoelectric elements are employed as sensors. The importance of optimal shape and location is demonstrated to be of the same order of influence as increasing the number of channels of control.

  14. Transmission problem for the Brinkman system

    Czech Academy of Sciences Publication Activity Database

    Medková, Dagmar

    2014-01-01

    Roč. 59, č. 12 (2014), s. 1664-1678 ISSN 1747-6933 R&D Projects: GA ČR(CZ) GAP201/11/1304 Institutional support: RVO:67985840 Keywords : Brinkman system * transmission problem * single- layer potential * double layer potential Subject RIV: BA - General Mathematics Impact factor: 0.610, year: 2014 http://www.tandfonline.com/doi/abs/10.1080/17476933.2013.870563

  15. Wind power development in the United States: Effects of policies and electricity transmission congestion

    Science.gov (United States)

    Hitaj, Claudia

    In this dissertation, I analyze the drivers of wind power development in the United States as well as the relationship between renewable power plant location and transmission congestion and emissions levels. I first examine the role of government renewable energy incentives and access to the electricity grid on investment in wind power plants across counties from 1998-2007. The results indicate that the federal production tax credit, state-level sales tax credit and production incentives play an important role in promoting wind power. In addition, higher wind power penetration levels can be achieved by bringing more parts of the electricity transmission grid under independent system operator regulation. I conclude that state and federal government policies play a significant role in wind power development both by providing financial support and by improving physical and procedural access to the electricity grid. Second, I examine the effect of renewable power plant location on electricity transmission congestion levels and system-wide emissions levels in a theoretical model and a simulation study. A new renewable plant takes the effect of congestion on its own output into account, but ignores the effect of its marginal contribution to congestion on output from existing plants, which results in curtailment of renewable power. Though pricing congestion removes the externality and reduces curtailment, I find that in the absence of a price on emissions, pricing congestion may in some cases actually increase system-wide emissions. The final part of my dissertation deals with an econometric issue that emerged from the empirical analysis of the drivers of wind power. I study the effect of the degree of censoring on random-effects Tobit estimates in finite sample with a particular focus on severe censoring, when the percentage of uncensored observations reaches 1 to 5 percent. The results show that the Tobit model performs well even at 5 percent uncensored observations

  16. Realistic modeling of radiation transmission inspection systems

    International Nuclear Information System (INIS)

    Sale, K.E.

    1993-01-01

    We have applied Monte Carlo particle transport methods to assess a proposed neutron transmission inspection system for checked luggage. The geometry of the system and the time, energy and angle dependence of the source have been modeled in detail. A pulsed deuteron beam incident on a thick Be target generates a neutron pulse with a very broad energy spectrum which is detected after passage through the luggage item by a plastic scintillator detector operating in current mode (as opposed to pulse counting mode). The neutron transmission as a function of time information is used to infer the densities of hydrogen, carbon, oxygen and nitrogen in the volume sampled. The measured elemental densities can be compared to signatures for explosives or other contraband. By using such computational modeling it is possible to optimize many aspects of the design of an inspection system without costly and time consuming prototyping experiments or to determine that a proposed scheme will not work. The methods applied here can be used to evaluate neutron or photon schemes based on transmission, scattering or reaction techniques

  17. Electric vehicle data acquisition system

    DEFF Research Database (Denmark)

    Svendsen, Mathias; Winther-Jensen, Mads; Pedersen, Anders Bro

    2014-01-01

    and industrial applications, e.g. research in electric vehicle driving patterns, vehicle substitutability analysis and fleet management. The platform is based on a embedded computer running Linux, and features a high level of modularity and flexibility. The system operates independently of the make of the car......, by using the On-board Diagnostic port to identify car model and adapt its software accordingly. By utilizing on-board Global Navigation Satellite System, General Packet Radio Service, accelerometer, gyroscope and magnetometer, the system not only provides valuable data for research in the field of electric......A data acquisition system for electric vehicles is presented. The system connects to the On-board Diagnostic port of newer vehicles, and utilizes the in-vehicle sensor network, as well as auxiliary sensors, to gather data. Data is transmitted continuously to a central database for academic...

  18. Estimating aquifer transmissivity from geo-electrical sounding ...

    African Journals Online (AJOL)

    Aquifer resistivity range from 4.26 ohm-m to 755.3 ohm-m with maximum thickness of 52.25m. A maximum 55.52m depth- tobasement was obtained in the study area. Based on the model obtained, aquifer Transmissivity was calculated and was used to delineate the study area into prospective low and high groundwater ...

  19. Impact of Variable Renewable Energy on European Cross-Border Electricity Transmission

    NARCIS (Netherlands)

    Brancucci Martinez-Anido, C.; De Vries, L.J.; Fulli, G.

    2012-01-01

    The estimated growth of Europe’s electricity demand and the policy goals of mitigating climate change result in an expected increase in variable renewable energy. A high penetration of wind and solar energy will bring several new challenges to the European electricity transmission network. The

  20. Development of a superconducting cable for transmission of high electric power

    International Nuclear Information System (INIS)

    Moisson, F.; Leroux, J.M.

    1971-01-01

    The opportunities opened by the use of cryoresistive and superconducting materials in underground transmission systems have led to a cryocable program. A first set of problems associated with the development of cryogenic cables deals with the cable system, i.e., design, safety, terminal equipment including leads, cryogenic equipment, refrigerators, and problems related to overload capability and reliability. A second set concerns the cable itself, i.e., scientific and technological problems associated with the conductor, the electrical insulation, and the thermal exchange between conductor and helium. Useful experience is gained on the design problems and on the technological problems involved in the construction of a cryoconducting cable. A 20-M aluminum cable cooled down to 25 0 K with pressurized helium flow was built and tested with 3500-A dc under 20 Kv; results are presented. On this model the following types of problems were solved. First, mechanical problems concerning cooling of the cable, thermal contraction of the pipes, electrical insulation and conductors, construction of an invariable cable constituted by elementary helically wound conductors were solved. Second, thermal problems of reduction of heat leaks, conception of thermal insulation, and segmentation of vacuum jackets were solved. Third, electrical problems of design of 300 0 to 25 0 K leads were solved; this problem of losses at both ends is, in proportion, more important for the short model than for long cable. Finally, refrigeration problems of helium and nitrogen flows, thermal shields and design of refrigerators (optimal capacity and spacing) were solved

  1. Relative localization in wireless sensor networks for measurement of electric fields under HVDC transmission lines.

    Science.gov (United States)

    Cui, Yong; Wang, Qiusheng; Yuan, Haiwen; Song, Xiao; Hu, Xuemin; Zhao, Luxing

    2015-02-04

    In the wireless sensor networks (WSNs) for electric field measurement system under the High-Voltage Direct Current (HVDC) transmission lines, it is necessary to obtain the electric field distribution with multiple sensors. The location information of each sensor is essential to the correct analysis of measurement results. Compared with the existing approach which gathers the location information by manually labelling sensors during deployment, the automatic localization can reduce the workload and improve the measurement efficiency. A novel and practical range-free localization algorithm for the localization of one-dimensional linear topology wireless networks in the electric field measurement system is presented. The algorithm utilizes unknown nodes' neighbor lists based on the Received Signal Strength Indicator (RSSI) values to determine the relative locations of nodes. The algorithm is able to handle the exceptional situation of the output permutation which can effectively improve the accuracy of localization. The performance of this algorithm under real circumstances has been evaluated through several experiments with different numbers of nodes and different node deployments in the China State Grid HVDC test base. Results show that the proposed algorithm achieves an accuracy of over 96% under different conditions.

  2. Relative Localization in Wireless Sensor Networks for Measurement of Electric Fields under HVDC Transmission Lines

    Directory of Open Access Journals (Sweden)

    Yong Cui

    2015-02-01

    Full Text Available In the wireless sensor networks (WSNs for electric field measurement system under the High-Voltage Direct Current (HVDC transmission lines, it is necessary to obtain the electric field distribution with multiple sensors. The location information of each sensor is essential to the correct analysis of measurement results. Compared with the existing approach which gathers the location information by manually labelling sensors during deployment, the automatic localization can reduce the workload and improve the measurement efficiency. A novel and practical range-free localization algorithm for the localization of one-dimensional linear topology wireless networks in the electric field measurement system is presented. The algorithm utilizes unknown nodes’ neighbor lists based on the Received Signal Strength Indicator (RSSI values to determine the relative locations of nodes. The algorithm is able to handle the exceptional situation of the output permutation which can effectively improve the accuracy of localization. The performance of this algorithm under real circumstances has been evaluated through several experiments with different numbers of nodes and different node deployments in the China State Grid HVDC test base. Results show that the proposed algorithm achieves an accuracy of over 96% under different conditions.

  3. MEASUREMENT AND ANALYSIS OF TRANSMISSION LOSSES IN THE SUPPLY SYSTEM OF ELECTRIFIED TRANSPORT

    Directory of Open Access Journals (Sweden)

    Mikołaj Bartłomiejczyk

    2016-11-01

    Full Text Available The issue of electric energy saving in public transport is currently becoming a key area of interest, a fact connected with both an increase in society’s environmental awareness and a rise in the prices of fuel and electricity. Electricity can be saved by reducing transmission losses in the supply system. The article presents a method of measurement and analysis of transmission losses in the supply system of electrified public transport on the example of trolleybus transport in Gdynia and Lublin in Poland.

  4. Wind energy conversion systems with electric transmission to the water pumping with field control to constant flow; Sistema de conversao de energia eolica com transmissao eletrica para bombeamento de agua com controle de campo a fluxo constante

    Energy Technology Data Exchange (ETDEWEB)

    Nobrega, Juraci Carlos de Castro

    1989-07-01

    The stead-state analysis of a Wind Energy Conversion Systems, consisting on a Windmill, Synchronous Generator, transmission Line and Induction Motor driving a Centrifugal Pump is developed. The performance of the system operating at variable Speed with a flux control is examined using mathematical and digital simulation. The control scheme is proposed and tested in laboratory and a tested in laboratory and a test centre to be compared with simulation results. (author)

  5. submitter Superconducting transmission lines – Sustainable electric energy transfer with higher public acceptance?

    CERN Document Server

    Thomas, Heiko; Chervyakov, Alexander; Stückrad, Stefan; Salmieri, Delia; Rubbia, Carlo

    2016-01-01

    Despite the extensive research and development investments into superconducting science and technology, both at the fundamental and at the applied levels, many benefits of superconducting transmission lines (SCTL) remain unknown to the public and decision makers at large. This paper aims at informing about the progress in this important research field. Superconducting transmission lines have a tremendous size advantage and lower total electrical losses for high capacity transmission plus a number of technological advantages compared to solutions based on standard conductors. This leads to a minimized environmental impact and enables an overall more sustainable transmission of electric energy. One of the direct benefits may be an increased public acceptance due to the low visual impact with a subsequent reduction of approval time. The access of remote renewable energy (RE) sources with high-capacity transmission is rendered possible with superior efficiency. That not only translates into further reducing $CO_2...

  6. Flexible AC transmission systems modelling and control

    CERN Document Server

    Zhang, Xiao-Ping; Pal, Bikash

    2012-01-01

    The extended and revised second edition of this successful monograph presents advanced modeling, analysis and control techniques of Flexible AC Transmission Systems (FACTS). The book covers comprehensively a range of power-system control problems: from steady-state voltage and power flow control, to voltage and reactive power control, to voltage stability control, to small signal stability control using FACTS controllers. In the six years since the first edition of the book has been published research on the FACTS has continued to flourish while renewable energy has developed into a mature and

  7. How dangerous are mobile phones, transmission masts, and electricity pylons?

    Science.gov (United States)

    Wood, A W

    2006-04-01

    Electrical power and mobile communications deliver enormous benefit to society, but there are concerns whether the electric and magnetic field (EMF) emissions associated with the delivery of this benefit are linked to cancer or other health hazards. This article reviews the strength of the available epidemiological and laboratory evidence and notes that this falls short of what is normally required to establish a causal link. However, because of scientific uncertainty a cautious approach is often advocated, but here, too, there may be a tendency to judge these risks more harshly than those in other areas with similar strength of evidence.

  8. Reconstruction of electric systems (ELE)

    International Nuclear Information System (INIS)

    Kohutovic, P.

    2001-01-01

    The original design of WWER-230 units consisted of a single common system EEPS (essential electric power supply system) per unit. The establishment of redundancy 2 x 100% EEPS was a global task. The task was started during the 'Small reconstruction' - MR V1, continued in 'Gradual reconstruction' and finished in the year 2000. (author)

  9. Overall Optimization for Offshore Wind Farm Electrical System

    DEFF Research Database (Denmark)

    Hou, Peng; Hu, Weihao; Chen, Cong

    2017-01-01

    Based on particle swarm optimization (PSO), an optimization platform for offshore wind farm electrical system (OWFES) is proposed in this paper, where the main components of an offshore wind farm and key technical constraints are considered as input parameters. The offshore wind farm electrical...... system is optimized in accordance with initial investment by considering three aspects: the number and siting of offshore substations (OS), the cable connection layout of both collection system (CS) and transmission system (TS) as well as the selection of electrical components in terms of voltage level...... that save 3.01% total cost compared with the industrial layout, and can be a useful tool for OWFES design and evaluation....

  10. Rigorous theoretical derivation of lumped models to transmission line systems

    International Nuclear Information System (INIS)

    Zhao Jixiang

    2012-01-01

    By virtue of the negative electric parameter concept, i.e. negative lumped resistance, inductance, conductance and capacitance (N-RLGC), the lumped equivalent models of transmission line systems, including the circuit model, two-port π-network and T-network, are given. We start from the N-segment-ladder-like equivalent networks composed distributed parameters, and achieve the input impedance in the form of a continued fraction. Utilizing the continued fraction theory, the expressions of input impedance are obtained under three kinds of extreme cases, i.e. the load impedances are equal to zero, infinity and characteristic impedance, respectively. When the number of segment N is limited to infinity, they are transformed to lumped elements. Comparison between the distributed model and lumped model of transmission lines, the expression of tanh γd, which is the key term in the transmission line equations, are obtained by RLGC, furthermore, according to input admittance, admittance matrix and ABCD matrix of transmission lines, the lumped equivalent circuit models, π-networks and T-networks have been given. The models are verified in the frequency and time domain, respectively, showing that the models are accurate and efficient. (semiconductor integrated circuits)

  11. Network cost in transmission and distribution of electric power

    International Nuclear Information System (INIS)

    Lindahl, A.; Naeslund, B.; Oettinger-Biberg, C.; Olander, H.; Wuolikainen, T.; Fritz, P.

    1994-01-01

    This report is divided in two parts, where part 1 treats the charges on the regional nets with special emphasis on the net owners tariffs on a deregulated market. Part 2 describes the development of the network costs in electric power distribution for the period 1991-1993. 11 figs, 33 tabs

  12. The Predominance of Electric Transport in Synaptic Transmission

    OpenAIRE

    Hamid Reza Noori

    2008-01-01

    The quantitative description of the motion of neurotransmitters in the synaptic cleft appears to be one of the most difficult problems in the modeling of synapses. Here we show in contradiction to the common view, that this process is merely governed by electric transport than diffusion forces.

  13. Major trends in the development of electrical power systems

    Energy Technology Data Exchange (ETDEWEB)

    Syromyatnikov, I A

    1965-01-01

    The comparison is made between the USA and the USSR electrical systems and their growth. The author states that USSR is about 35 years behind in the construction of power transmission lines of 22 kV and above. Various graphs of economic developments are presented. It is stated that the work in the near future should be concentrated on 750 kV network and on combining the USSR electric power distribution into a single power system.

  14. Virtual scarce water embodied in inter-provincial electricity transmission in China

    International Nuclear Information System (INIS)

    Zhang, Chao; Zhong, Lijin; Liang, Sai; Sanders, Kelly T.; Wang, Jiao; Xu, Ming

    2017-01-01

    Highlights: • Virtual water in inter-provincial electricity transmission in China is calculated. • A Water Stress Index is used to reflect relative scarcity of water consumption. • West Inner Mongolia is the largest exporter of scarce water. • Hebei, Beijing and Shandong are the three largest receivers of scarce water. - Abstract: Intra-national electricity transmission drives virtual water transfer from electricity production regions to electricity consumption regions. In China, the water-intensive thermoelectric power industry is expanding quickly in many water-scarce energy production hubs in northern and northwestern provinces. This study constructed a node-flow model of inter-provincial electricity transmission to investigate the virtual water and scarcity-adjusted virtual water (or virtual scarce water) embodied in the electricity transmission network. It is revealed that total inter-provincial virtual water transfer embodied in electricity transmission was 623 million m"3 in 2011, equivalent to 12.7% of the national total thermoelectric water consumption. The top three largest single virtual water flows are West Inner Mongolia-to-Beijing (44 million m"3), East Inner Mongolia-to-Liaoning (39 million m"3), and Guizhou-to-Guangdong (37 million m"3). If the actual volumes of consumptive water use are translated into scarcity-adjusted water consumption based on Water Stress Index, West Inner Mongolia (81 million m"3), Shanxi (63 million m"3) and Ningxia (30 million m"3) become the top three exporters of virtual scarce water. Many ongoing long-distance electricity transmission projects in China will enlarge the scale of scarce water outflows from northwestern regions and potentially increase their water stress.

  15. Autonomously managed electrical power systems

    Science.gov (United States)

    Callis, Charles P.

    1986-01-01

    The electric power systems for future spacecraft such as the Space Station will necessarily be more sophisticated and will exhibit more nearly autonomous operation than earlier spacecraft. These new power systems will be more reliable and flexible than their predecessors offering greater utility to the users. Automation approaches implemented on various power system breadboards are investigated. These breadboards include the Hubble Space Telescope power system test bed, the Common Module Power Management and Distribution system breadboard, the Autonomusly Managed Power System (AMPS) breadboard, and the 20 kilohertz power system breadboard. Particular attention is given to the AMPS breadboard. Future plans for these breadboards including the employment of artificial intelligence techniques are addressed.

  16. The design, construction, and operation of long-distance high-voltage electricity transmission technologies.

    Energy Technology Data Exchange (ETDEWEB)

    Molburg, J. C.; Kavicky, J. A.; Picel, K. C.

    2008-03-03

    This report focuses on transmission lines, which operate at voltages of 115 kV and higher. Currently, the highest voltage lines comprising the North American power grid are at 765 kV. The grid is the network of transmission lines that interconnect most large power plants on the North American continent. One transmission line at this high voltage was built near Chicago as part of the interconnection for three large nuclear power plants southwest of the city. Lines at this voltage also serve markets in New York and New England, also very high demand regions. The large power transfers along the West Coast are generally at 230 or 500 kV. Just as there are practical limits to centralization of power production, there are practical limits to increasing line voltage. As voltage increases, the height of the supporting towers, the size of the insulators, the distance between conductors on a tower, and even the width of the right-of-way (ROW) required increase. These design features safely isolate the electric power, which has an increasing tendency to arc to ground as the voltage (or electrical potential) increases. In addition, very high voltages (345 kV and above) are subject to corona losses. These losses are a result of ionization of the atmosphere, and can amount to several megawatts of wasted power. Furthermore, they are a local nuisance to radio transmission and can produce a noticeable hum. Centralized power production has advantages of economies of scale and special resource availability (for instance, hydro resources), but centralized power requires long-distance transfers of power both to reach customers and to provide interconnections for reliability. Long distances are most economically served at high voltages, which require large-scale equipment and impose a substantial footprint on the corridors through which power passes. The most visible components of the transmission system are the conductors that provide paths for the power and the towers that keep these

  17. Electrical power system WP-04

    Science.gov (United States)

    Nored, Donald L.

    1990-01-01

    Viewgraphs on Space Station Freedom Electrical Power System (EPS) WP-40 are presented. Topics covered include: key EPS technical requirements; photovoltaic power module systems; solar array assembly; blanket containment box and box positioning subassemblies; solar cell; bypass diode assembly; Kapton with atomic oxygen resistant coating; sequential shunt unit; gimbal assembly; energy storage subsystem; thermal control subsystem; direct current switching unit; integrated equipment assembly; PV cargo element; PMAD system; and PMC and AC architecture.

  18. Radiation effects on optical data transmission systems

    International Nuclear Information System (INIS)

    Leskovar, B.

    1989-01-01

    The state of the art of optical transmitters, low loss fiber waveguides and receivers in both steady state and pulsed radiation environments is reviewed and summarized. Emphasis is placed on the effects of irradiation on the performance of light emitting and laser diodes, optical fiber waveguides and photodiodes. The influence of radiation-induced attenuation of optical fibers due to total dose, dose rate, time after irradiation, temperature, radiation history, photobleaching, OH and impurity content, dopant type and concentration is described. The performance of candidate components of the transmission system intended for deployment in the Superconducting Super Collider Detector and primary beam tunnel nuclear environment is discussed

  19. Electric energy supply systems: description of available technologies

    Energy Technology Data Exchange (ETDEWEB)

    Eisenhauer, J.L.; Rogers, E.A.; King, J.C.; Stegen, G.E.; Dowis, W.J.

    1985-02-01

    When comparing coal transportation with electric transmission as a means of delivering electric power, it is desirable to compare entire energy systems rather than just the transportation/transmission components because the requirements of each option may affect the requirements of other energy system components. PNL's assessment consists of two parts. The first part, which is the subject of this document, is a detailed description of the technical, cost, resource and environmental characteristics of each system component and technologies available for these components. The second part is a computer-based model that PNL has developed to simulate construction and operation of alternative system configurations and to compare the performance of these systems under a variety of economic and technical conditions. This document consists of six chapters and two appendices. A more thorough description of coal-based electric energy systems is presented in the Introduction and Chapter 1. Each of the subsequent chapters describes technologies for five system components: Western coal resources (Chapter 2), coal transportation (Chapter 3), coal gasification and gas transmission (Chapter 4), and electric power transmission (Chapter 6).

  20. 47 CFR 73.626 - DTV distributed transmission systems.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false DTV distributed transmission systems. 73.626... RADIO BROADCAST SERVICES Television Broadcast Stations § 73.626 DTV distributed transmission systems. (a... distributed transmission system (DTS). Except as expressly provided in this section, DTV stations operating a...

  1. Chameleon's behavior of modulable nonlinear electrical transmission line

    Science.gov (United States)

    Togueu Motcheyo, A. B.; Tchinang Tchameu, J. D.; Fewo, S. I.; Tchawoua, C.; Kofane, T. C.

    2017-12-01

    We show that modulable discrete nonlinear transmission line can adopt Chameleon's behavior due to the fact that, without changing its appearance structure, it can become alternatively purely right or left handed line which is different to the composite one. Using a quasidiscrete approximation, we derive a nonlinear Schrödinger equation, that predicts accurately the carrier frequency threshold from the linear analysis. It appears that the increasing of the linear capacitor in parallel in the series branch induced the selectivity of the filter in the right-handed region while it increases band pass filter in the left-handed region. Numerical simulations of the nonlinear model confirm the forward wave in the right handed line and the backward wave in the left handed one.

  2. Methods to Regulate Unbundled Transmission and Distribution Business on Electricity Markets

    International Nuclear Information System (INIS)

    Forsberg, Kaj; Fritz, Peter

    2003-11-01

    The regulation of distribution utilities is evolving from the traditional approach based on a cost of service or rate of return remuneration, to ways of regulation more specifically focused on providing incentives for improving efficiency, known as performance-based regulation or ratemaking. Modern regulation systems are also, to a higher degree than previously, intended to simulate competitive market conditions. The Market Design 2003-conference gathered people from 18 countries to discuss 'Methods to regulate unbundled transmission and distribution business on electricity markets'. Speakers from nine different countries and backgrounds (academics, industry and regulatory) presented their experiences and most recent works on how to make the regulation of unbundled distribution business as accurate as possible. This paper does not claim to be a fully representative summary of everything that was presented or discussed during the conference. Rather, it is a purposely restricted document where we focus on a few central themes and experiences from different countries

  3. Methods to Regulate Unbundled Transmission and Distribution Business on Electricity Markets

    Energy Technology Data Exchange (ETDEWEB)

    Forsberg, Kaj; Fritz, Peter

    2003-11-01

    The regulation of distribution utilities is evolving from the traditional approach based on a cost of service or rate of return remuneration, to ways of regulation more specifically focused on providing incentives for improving efficiency, known as performance-based regulation or ratemaking. Modern regulation systems are also, to a higher degree than previously, intended to simulate competitive market conditions. The Market Design 2003-conference gathered people from 18 countries to discuss 'Methods to regulate unbundled transmission and distribution business on electricity markets'. Speakers from nine different countries and backgrounds (academics, industry and regulatory) presented their experiences and most recent works on how to make the regulation of unbundled distribution business as accurate as possible. This paper does not claim to be a fully representative summary of everything that was presented or discussed during the conference. Rather, it is a purposely restricted document where we focus on a few central themes and experiences from different countries.

  4. A method of applying two-pump system in automatic transmissions for energy conservation

    Directory of Open Access Journals (Sweden)

    Peng Dong

    2015-06-01

    Full Text Available In order to improve the hydraulic efficiency, modern automatic transmissions tend to apply electric oil pump in their hydraulic system. The electric oil pump can support the mechanical oil pump for cooling, lubrication, and maintaining the line pressure at low engine speeds. In addition, the start–stop function can be realized by means of the electric oil pump; thus, the fuel consumption can be further reduced. This article proposes a method of applying two-pump system (one electric oil pump and one mechanical oil pump in automatic transmissions based on the forward driving simulation. A mathematical model for calculating the transmission power loss is developed. The power loss transfers to heat which requires oil flow for cooling and lubrication. A leakage model is developed to calculate the leakage of the hydraulic system. In order to satisfy the flow requirement, a flow-based control strategy for the electric oil pump is developed. Simulation results of different driving cycles show that there is a best combination of the size of electric oil pump and the size of mechanical oil pump with respect to the optimal energy conservation. Besides, the two-pump system can also satisfy the requirement of the start–stop function. This research is extremely valuable for the forward design of a two-pump system in automatic transmissions with respect to energy conservation and start–stop function.

  5. ac propulsion system for an electric vehicle

    Science.gov (United States)

    Geppert, S.

    1980-01-01

    It is pointed out that dc drives will be the logical choice for current production electric vehicles (EV). However, by the mid-80's, there is a good chance that the price and reliability of suitable high-power semiconductors will allow for a competitive ac system. The driving force behind the ac approach is the induction motor, which has specific advantages relative to a dc shunt or series traction motor. These advantages would be an important factor in the case of a vehicle for which low maintenance characteristics are of primary importance. A description of an EV ac propulsion system is provided, taking into account the logic controller, the inverter, the motor, and a two-speed transmission-differential-axle assembly. The main barrier to the employment of the considered propulsion system in EV is not any technical problem, but inverter transistor cost.

  6. Alternatives to electricity for transmission and annual-scale firming - Storage for diverse, stranded, renewable energy resources: hydrogen and ammonia

    Energy Technology Data Exchange (ETDEWEB)

    Leighty, William

    2010-09-15

    The world's richest renewable energy resources 'of large geographic extent and high intensity' are stranded: far from end-users with inadequate or nonexistent gathering and transmission systems to deliver energy. Output of most renewables varies greatly, at time scales of seconds-seasons: energy capture assets operate at low capacity factor; energy delivery is not 'firm'. New electric transmission systems, or fractions thereof, dedicated to renewables, suffer the same low CF: substantial stranded capital assets, increasing the cost of delivered renewable-source energy. Electricity storage cannot affordably firm large renewables at annual scale. Gaseous hydrogen and anhydrous ammonia fuels can: attractive alternatives.

  7. Electricity pricing and management systems

    International Nuclear Information System (INIS)

    Sawal, D.M.; Bajapai, Ashok

    1997-01-01

    The installed capacity of power generation in India is at present 80,000 MW. Out of the total 5.79 lakh inhabitated villages in the country, 4.79 villages have been electrified so far. Total number of consumers of electricity are about 95 million in the country. For such a large country with population of over 900 million and area of 32.873 lakh sq. kms., the role of electricity pricing and management system of the power sector is of paramount importance

  8. Electric system training with programmable controllers

    International Nuclear Information System (INIS)

    Benson, M.B.

    1989-01-01

    A power system simulator (PSS) for training system operators has been opened at the Pacific Gas and Electric Training Center at San Ramon, California. The simulator was designed as an instructional aid and is part of a larger, more comprehensive operating training facility. It has the capability of duplicating both routine and emergency situations for transmission and distribution lines, power plants, and substations. Modeled after nuclear plant simulators, the PSS utilizes state-of-the-art technology and is believed to be on the leading edge of power system simulators. The new operator training facility covers 10,000 ft/sup 2/ and is divided into four classrooms, two labs, three simulated dispatch centers, and various administrative offices. Ten full- and part-time instructors are on staff to train the over 900 system, power plant, agency, and trainee personnel. The simulator is considered the heart of the complex and covers over half of the available floor space. It is divided into two large rooms and further separated by the dispatch centers. The indoor room represents the high-voltage transmission and generating stations, the outdoor room is for both the lower-voltage distribution system and simulated physical equipment. In each room, full-size control boards (equipped with actual relay protection and automatic schemes) are arranged into various stations and lines

  9. Optimization of output power and transmission efficiency of magnetically coupled resonance wireless power transfer system

    Science.gov (United States)

    Yan, Rongge; Guo, Xiaoting; Cao, Shaoqing; Zhang, Changgeng

    2018-05-01

    Magnetically coupled resonance (MCR) wireless power transfer (WPT) system is a promising technology in electric energy transmission. But, if its system parameters are designed unreasonably, output power and transmission efficiency will be low. Therefore, optimized parameters design of MCR WPT has important research value. In the MCR WPT system with designated coil structure, the main parameters affecting output power and transmission efficiency are the distance between the coils, the resonance frequency and the resistance of the load. Based on the established mathematical model and the differential evolution algorithm, the change of output power and transmission efficiency with parameters can be simulated. From the simulation results, it can be seen that output power and transmission efficiency of the two-coil MCR WPT system and four-coil one with designated coil structure are improved. The simulation results confirm the validity of the optimization method for MCR WPT system with designated coil structure.

  10. The effects of average revenue regulation on electricity transmission investment and pricing

    International Nuclear Information System (INIS)

    Matsukawa, Isamu

    2008-01-01

    This paper investigates the long-run effects of average revenue regulation on an electricity transmission monopolist who applies a two-part tariff comprising a variable congestion price and a non-negative fixed access fee. A binding constraint on the monopolist's expected average revenue lowers the access fee, promotes transmission investment, and improves consumer surplus. In a case of any linear or log-linear electricity demand function with a positive probability that no congestion occurs, average revenue regulation is allocatively more efficient than a Coasian two-part tariff if the level of capacity under average revenue regulation is higher than that under a Coasian two-part tariff. (author)

  11. Enhanced transmission of transverse electric waves through periodic arrays of structured subwavelength apertures

    DEFF Research Database (Denmark)

    Xiao, Sanshui; Peng, Liang; Mortensen, Asger

    2010-01-01

    Transmission through sub-wavelength apertures in perfect metals is expected to be strongly suppressed. However, by structural engineering of the apertures, we numerically demonstrate that the transmission of transverse electric waves through periodic arrays of subwavelength apertures in a thin...... metallic film can be significantly enhanced. Based on equivalent circuit theory analysis, periodic arrays of square structured subwavelength apertures are obtained with a 1900-fold transmission enhancement factor when the side length a of the apertures is 10 times smaller than the wavelength (a/λ =0...

  12. Flexible AC transmission systems: the state of the art

    Energy Technology Data Exchange (ETDEWEB)

    Edris, Abdel-Aty [Electric Power Research Inst., Palo Alto, CA (United States). Electric Systems Division

    1994-12-31

    Flexible AC transmission systems (FACTS) is a concept promoting the use of power electronic controllers to enhance the controllability and usable capacity of AC transmission. This paper presents the state of the art of FACTS and the status of the current projects for the application of the FACTS controllers in transmission systems. (author) 8 refs., 8 figs.

  13. 47 CFR 73.6023 - Distributed transmission systems.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Distributed transmission systems. 73.6023... distributed transmission system. [73 FR 74064, Dec. 5, 2008] ... RADIO BROADCAST SERVICES Class A Television Broadcast Stations § 73.6023 Distributed transmission...

  14. Control system and method for a hybrid electric vehicle

    Science.gov (United States)

    Tamor, Michael Alan

    2001-03-06

    Several control methods are presented for application in a hybrid electric vehicle powertrain including in various embodiments an engine, a motor/generator, a transmission coupled at an input thereof to receive torque from the engine and the motor generator coupled to augment torque provided by the engine, an energy storage device coupled to receive energy from and provide energy to the motor/generator, an engine controller (EEC) coupled to control the engine, a transmission controller (TCM) coupled to control the transmission and a vehicle system controller (VSC) adapted to control the powertrain.

  15. Cross-Country Electricity Trade, Renewable Energy and European Transmission Infrastructure Policy

    OpenAIRE

    Abrell, Jan; Rausch, Sebastian

    2016-01-01

    This paper develops a multi-country multi-sector general equilibrium model, integrating high-frequency electricity dispatch and trade decisions, to study the e ects of electricity transmission infrastructure (TI) expansion and re- newable energy (RE) penetration in Europe for gains from trade and carbon dioxide emissions in the power sector. TI can bene t or degrade environ- mental outcomes, depending on RE penetration: it complements emissions abatement by mitigating dispatch problems associ...

  16. Optimization and Control of Electric Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Lesieutre, Bernard C. [Univ. of Wisconsin, Madison, WI (United States); Molzahn, Daniel K. [Univ. of Wisconsin, Madison, WI (United States)

    2014-10-17

    The analysis and optimization needs for planning and operation of the electric power system are challenging due to the scale and the form of model representations. The connected network spans the continent and the mathematical models are inherently nonlinear. Traditionally, computational limits have necessitated the use of very simplified models for grid analysis, and this has resulted in either less secure operation, or less efficient operation, or both. The research conducted in this project advances techniques for power system optimization problems that will enhance reliable and efficient operation. The results of this work appear in numerous publications and address different application problems include optimal power flow (OPF), unit commitment, demand response, reliability margins, planning, transmission expansion, as well as general tools and algorithms.

  17. Combined heuristic with fuzzy system to transmission system expansion planning

    Energy Technology Data Exchange (ETDEWEB)

    Silva Sousa, Aldir; Asada, Eduardo N. [University of Sao Paulo, Sao Carlos School of Engineering, Department of Electrical Engineering Av. Trabalhador Sao-carlense, 400, 13566-590 Sao Carlos, SP (Brazil)

    2011-01-15

    A heuristic algorithm that employs fuzzy logic is proposed to the power system transmission expansion planning problem. The algorithm is based on the divide to conquer strategy, which is controlled by the fuzzy system. The algorithm provides high quality solutions with the use of fuzzy decision making, which is based on nondeterministic criteria to guide the search. The fuzzy system provides a self-adjusting mechanism that eliminates the manual adjustment of parameters to each system being solved. (author)

  18. Influence of big power motors for irrigation of electric systems

    International Nuclear Information System (INIS)

    Shimoda, M.; Gialuca, V.; Trombetta, O.R.

    1988-01-01

    The evolution of rural electrification in CPFL - Companhia Paulista de Forca e Luz, Sao Paulo State, Brazil, and the influence of big power motors installation for irrigation in electric system are shown. Considerations about rural market, energy consumption, planning of distribution and transmission line and some calculations are also presented. (author)

  19. Superconducting magnetic energy storage for electric utilities and fusion systems

    International Nuclear Information System (INIS)

    Rogers, J.D.; Boenig, H.J.; Hassenzahl, W.V.

    1978-01-01

    Superconducting inductors provide a compact and efficient means of storing electrical energy without an intermediate conversion process. Energy storage inductors are under development for load leveling and transmission line stabilization in electric utility systems and for driving magnetic confinement and plasma heating coils in fusion energy systems. Fluctuating electric power demands force the electric utility industry to have more installed generating capacity than the average load requires. Energy storage can increase the utilization of base-load fossil and nuclear power plants for electric utilities. The Los Alamos Scientific Laboratory and the University of Wisconsin are developing superconducting magnetic energy storage (SMES) systems, which will store and deliver electrical energy for load leveling, peak shaving, and the stabilization of electric utility networks. In the fusion area, inductive energy transfer and storage is being developed. Both 1-ms fast-discharge theta-pinch systems and 1-to-2-s slow energy transfer tokamak systems have been demonstrated. The major components and the method of operation of a SMES unit are described, and potential applications of different size SMES systems in electric power grids are presented. Results are given of a reference design for a 10-GWh unit for load leveling, of a 30-MJ coil proposed for system stabilization, and of tests with a small-scale, 100-kJ magnetic energy storage system. The results of the fusion energy storage and transfer tests are presented. The common technology base for the various storage systems is discussed

  20. Enhanced Electric Power Transmission by Hybrid Compensation Technique

    International Nuclear Information System (INIS)

    Palanichamy, C; Kiu, G Q

    2015-01-01

    In today's competitive environment, new power system engineers are likely to contribute immediately to the task, without years of seasoning via on-the-job training, mentoring, and rotation assignments. At the same time it is becoming obligatory to train power system engineering graduates for an increasingly quality-minded corporate environment. In order to achieve this, there is a need to make available better-quality tools for educating and training power system engineering students and in-service system engineers too. As a result of the swift advances in computer hardware and software, many windows-based computer software packages were developed for the purpose of educating and training. In line with those packages, a simulation package called Hybrid Series-Shunt Compensators (HSSC) has been developed and presented in this paper for educational purposes. (paper)

  1. High Voltage AC underground cable systems for power transmission

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Silva, Filipe Miguel Faria da

    2016-01-01

    researching electrical engineering topics related to using underground cables for power transmission at EHV level and including the 420 kV level. The research topics were laid down by ET/AAU and Energinet.dk in the DANPAC (DANish Power systems with AC Cables) research project. The main topics are discussed...... on the basis of 39 references published by ET/AAU and Energinet.dk. Part I of the paper explains the events that lead to the research project, reactive power compensation, modelling for transient studies, including field measurements and improvements to the existing models, and temporary overvoltages due...... to resonances. Part II covers transient phenomena, harmonics in cables, system modelling for different phenomena, main and backup protections in cable-based networks, online fault detection and future trends....

  2. High Voltage AC underground cable systems for power transmission

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Silva, Filipe Miguel Faria da

    2016-01-01

    researching electrical engineering topics related to using underground cables for power transmission at EHV level and including the 420 kV level. The research topics were laid down by ET/AAU and Energinet.dk in the DANPAC (DANish Power systems with Ac Cables) research project. The main topics are discussed...... on the basis of 39 references published by ET/AAU and Energinet.dk. Part I of the paper explains the events that lead to the research project, reactive power compensation, modelling for transient studies, including field measurements and improvements to the existing models, and temporary overvoltages due...... to resonances. Part II covers transient phenomena, harmonics in cables, system modelling for different phenomena, main and backup protections in cable-based networks, online fault detection and future trends....

  3. Voltage control in the future power transmission systems

    DEFF Research Database (Denmark)

    Qin, Nan

    Wind energy in Denmark covers 42% of the total power consumption in 2015, and will share up to 50% by 2020. Consequently, the conventional power plants are decommissioning. Under the progress of the green transition, the national decision leads to underground many overhead lines in the future...... stages. The voltage uncertainty caused by the wind power forecasting errors is estimated, which is applied as a voltage security margin to further constrain the voltage magnitude in the optimization problem. The problem under the uncertainty is therefore converted to a deterministic problem, which...... to ensure a highly reliable transmission, e.g. balancing the generation and the consumption in large geographic regions, the exchange capacities will be enlarged by upgrading the interconnections. The Danish power system, the electricity transportation hub between the Nordic and continental European systems...

  4. Manned spacecraft electrical power systems

    Science.gov (United States)

    Simon, William E.; Nored, Donald L.

    1987-01-01

    A brief history of the development of electrical power systems from the earliest manned space flights illustrates a natural trend toward a growth of electrical power requirements and operational lifetimes with each succeeding space program. A review of the design philosophy and development experience associated with the Space Shuttle Orbiter electrical power system is presented, beginning with the state of technology at the conclusion of the Apollo Program. A discussion of prototype, verification, and qualification hardware is included, and several design improvements following the first Orbiter flight are described. The problems encountered, the scientific and engineering approaches used to meet the technological challenges, and the results obtained are stressed. Major technology barriers and their solutions are discussed, and a brief Orbiter flight experience summary of early Space Shuttle missions is included. A description of projected Space Station power requirements and candidate system concepts which could satisfy these anticipated needs is presented. Significant challenges different from Space Shuttle, innovative concepts and ideas, and station growth considerations are discussed. The Phase B Advanced Development hardware program is summarized and a status of Phase B preliminary tradeoff studies is presented.

  5. Fiber optic transmission system delivered to Fusion Research Center of Japan Atomic Energy Research Institute

    International Nuclear Information System (INIS)

    Hayashida, Mutsuo; Hiramoto, Kiyoshi; Yamazaki, Kunihiro

    1983-01-01

    In general there are many electromagnetically induced noises in the premises of factories, power plants and substations. Under such electrically bad environments, for the computer data transmission that needs high speed processing and high reliability, the optical fiber cable is superion to the coaxial cable or the flat-type cable in aspects of the inductionlessness and a wide bandwidth. Showa Electric Wire and Cable Co., Ltd. has delivered and installed a computer data transmission system consisting of optical modems and optical fiber cables for connecting every experiment building in the premises of Fusion Research Center of Japan Atomic Energy Research Institute. This paper describes the outline of this system. (author)

  6. Electrical Structure of Future Off-shore Wind Power Plant with a High Voltage Direct Current Power Transmission

    DEFF Research Database (Denmark)

    Sharma, Ranjan

    The increasing demand of electric power and the growing consciousness towards the changing climate has led to a rapid development of renewable energy in the recent years. Among all, wind energy has been the fastest growing energy source in the last decade. But the growing size of wind power plants......, better wind conditions at off-shore and the general demand to put them out of sight have all contributed to the installation of large wind power plants in off-shore condition. However, moving wind power plants far out in the off-shore comes with many associated problems. One of the main challenges...... is the transmission of power over long distance. Historically, the power transmission from off-shore wind power plants has been done via HVAC submarine cables. This provides a simple solution, but AC cables cannot be arbitrarily long. It is shown in the report that major issues with HVAC cable transmission system...

  7. The Economics of Storage, Transmission and Drought: Integrating Variable Wind Power into Spatially Separated Electricity Grids

    NARCIS (Netherlands)

    Scora, H.; Sopinka, A.; Kooten, van G.C.

    2012-01-01

    To mitigate the high variability of wind and make it a more viable renewable energy source, observers recommend greater integration of spatially-separated electrical grids, with high transmission lines linking load centers, scattered wind farms and hydro storage sites. In this study, we examine the

  8. 78 FR 70163 - Communication of Operational Information between Natural Gas Pipelines and Electric Transmission...

    Science.gov (United States)

    2013-11-22

    ... Street NE., Washington, DC 20426, (202) 502-8931, [email protected] . Anna Fernandez (Legal Information), Office of the General Counsel, 888 First Street NE., Washington, DC 20426, (202) 502-6682, anna.... Questions Posed by the Commission 100. A. Generator to Electric Transmission Operator 100. Communications 1...

  9. Price-based optimal control of power flow in electrical energy transmission networks

    NARCIS (Netherlands)

    Jokic, A.; Lazar, M.; Bosch, van den P.P.J.; Bemporad, A.; Bicchi, A.; Buttazzo, G.

    2007-01-01

    This article presents a novel control scheme for achieving optimal power balancing and congestion control in electrical energy transmission networks via nodal prices. We develop an explicit controller that guarantees economically optimal steady-state operation while respecting all line flow

  10. Electric systems failures produced by CG lightning in Eastern Amazonia

    Directory of Open Access Journals (Sweden)

    Ana Paula Paes dos Santos

    2014-12-01

    Full Text Available Operational records of power outages of the electric energy distribution systems in eastern Amazonia presented a large number of events attributed to lightning strikes, during the 2006 to 2009 period. The regional electricity concessionary data were compared to actual lightning observations made by SIPAM's LDN system, over two areas where operational sub systems of transmission lines are installed. Statistical relations were drawn between the monthly lightning occurrence density and the number of power outages of the electric systems for both areas studied. The results showed that, although with some delays between these variables peaks, the number of power disruptions has a tendency to follow the behavior of the lightning occurrence densities variations. The numerical correlations were positive and may be useful to the transmission lines maintenance crews at least for the Belém-Castanhal electricity distribution sub system. Evidence was found, that the SST's over certain areas of the Pacific and Atlantic Oceans, influence convection over the area of interest, and may help to prognosticate the periods of intense electric storms, requiring repair readiness for the regional electric systems.

  11. Electric vehicle energy management system

    Science.gov (United States)

    Alaoui, Chakib

    This thesis investigates and analyzes novel strategies for the optimum energy management of electric vehicles (EVs). These are aimed to maximize the useful life of the EV batteries and make the EV more practical in order to increase its acceptability to market. The first strategy concerns the right choice of the batteries for the EV according to the user's driving habits, which may vary. Tests conducted at the University of Massachusetts Lowell battery lab show that the batteries perform differently from one manufacturer to the other. The second strategy was to investigate the fast chargeability of different batteries, which leads to reduce the time needed to recharge the EV battery pack. Tests were conducted again to prove that only few battery types could be fast charged. Test data were used to design a fast battery charger that could be installed in an EV charging station. The third strategy was the design, fabrication and application of an Electric Vehicle Diagnostic and Rejuvenation System (EVDRS). This system is based on Mosfet Controlled Thyristors (MCTs). It is capable of quickly identifying any failing battery(s) within the EV pack and rejuvenating the whole battery pack without dismantling them and unloading them. A novel algorithm to rejuvenate Electric Vehicle Sealed Lead Acid Batteries is described. This rejuvenation extends the useful life of the batteries and makes the EV more competitive. The fourth strategy was to design a thermal management system for EV, which is crucial to the safe operation, and the achievement of normal/optimal performance of, electric vehicle (EV) batteries. A novel approach for EV thermal management, based on Pettier-Effect heat pumps, was designed, fabricated and tested in EV. It shows the application of this type of technology for thermal management of EVs.

  12. Electricity system performance in Brazil

    International Nuclear Information System (INIS)

    Pires Rodrigues, A.; Souza Dias, D. De

    1992-01-01

    Nowadays, there is great uncertainty and concern about the capacity of the electric sector to go ahead with the programme of investments which was planned to keep pace with the growth in electricity demand. The sector is in an important financial crisis caused by the progressive reduction in its ability to generate resources either through self-financing or through external sources. The Brazilian electric sector is mostly public. Moreover, it is marked by a high degree of integration, which makes the whole system vulnerable to problem in each of its parts. First, the financial health of the Electrobras system which is at the top of the pyramidal sectoral structure depends on the capacity of the state-level utilities (operating mainly on the distribution side) to pay for the bulk supplies which they buy from Electrobras-controlled utilities. Second, tariffs are equal in the country as a whole regardless of differences in costs. Differences must be covered by the transfers between state utilities. Thus, there is also a significant horizontal financial inter-dependence in the sector. These institutional characteristics have been very important in the context of the present financial crisis

  13. EHV/HV Underground Cable Systems for Power Transmission

    DEFF Research Database (Denmark)

    Bak, Claus Leth

    of the transmission system must be re‐thought in order to accommodate the transmission needs for the future. New lines have to be constructed. Transmission lines are usually laid out as overhead lines, which are large structures, i.e. a 400 kV power pylon is 50 meters high. According to public opinion, such power...

  14. United Kingdom electric system privatization

    Energy Technology Data Exchange (ETDEWEB)

    Lolli, A. (Bologna Univ. (Italy))

    1992-03-01

    This paper reviews the mechanics and first results of deregulation in the electric power industry of the United Kingdom. Several aspects are dealt with, namely: 1983 Energy Act impacts on ownership and subsequent changes brought about by the 1989 Energy Act; the Act's stipulations with regard to share acquisition and distribution; the division of the patrimony of the Area Boards; natural monopolistic characteristics of power distribution; vertical integration in Scotland, target investment limits in Government and public participation; the 'golden share' concept to guarantee public participation; current 40% share ownership by the Government; 15% private ownership limit for individual investors; external control by Government of licensing and rate structure setting; the impacts of organizational changes on the overall cost benefits of deregulation; modified Governmental regulatory powers; measures to ensure competition and consumer protection; provisions regarding misbehaviour; second tier suppliers and reserve fuel supply obligations; deregulation impacts on nuclear power marketing; power pooling regulations; installation of new transmission lines; provisions encouraging the use of diverse energy sources; franchising; interconnection with national grid; regulation of technical operations; standby as it affects rate structure; and spot market pricing.

  15. 55th electric science promotion prize (progress prize). Demonstration of optical soliton transmission on OPGW first in the world; Dai 55 kai denki gakujutsu shinkosho (shinposho) jusho. Seiaihatsu no OPGW ni okeru hikari soriton denso no jissho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-10

    Electric science promotion prize (progress prize) is given to `Person who newly proposed a new concept, theory, material, device, system and method on electrical science and technology, or demonstrated these proposals` by the commendation committee of Institute of Electrical Engineers of Japan every year. Eight promotion prizes including that for Kansai Electric Power`s `Demonstration of optical soliton transmission on OPGW first in the world` were given. This research succeeded in development of the transmission/ receiving device suitable for optical soliton transmission, and the prediction method of an optimum transmission condition by computer simulation. In addition, this research succeeded in 10Gbit transmission of 784km and 40Gbit transmission (4-wave multiplex) of 392km by applying the above research result to Okurobe trunk line OPGW (98.2km). This demonstration of optical soliton transmission on OPGW is first in the world. (NEDO)

  16. Market power in the European electricity market - The impacts of dry weather and additional transmission capacity

    International Nuclear Information System (INIS)

    Lise, Wietze; Hobbs, Benjamin F.; Hers, Sebastiaan

    2008-01-01

    This paper uses a static computational game theoretic model of a fully opened European electricity market and can take strategic interaction among electricity-producing firms into account. The model is run for a number of scenarios: first, in the baseline under perfect competition, the prices differ due to the presence of various generation technologies and a limited ability to exchange electricity among countries. In addition, when large firms exercise market power, the model runs indicate that prices are the highest in countries where the number of firms is low. Second, dry weather would increase the prices in the hydro-rich Nordic countries followed by the Alpine countries. The price response would be about 20% higher with market power. Third, more transmission capacity would lower the prices in countries with high prices and it also reduces the impact of market power. Hence, more transmission capacity can improve market competitiveness. (author)

  17. Market power in the European electricity market - The impacts of dry weather and additional transmission capacity

    Energy Technology Data Exchange (ETDEWEB)

    Lise, Wietze [IBS Research and Consultancy, Agahamami Cadessi 1/6, Aga Han, Cihangir, 34433 Beyoglu, Istanbul (Turkey); Energy Markets and International Environmental Policy Group, ECN Policy Studies, Energy Research Centre of the Netherlands, Amsterdam (Netherlands); Hobbs, Benjamin F. [Department of Geography and Environmental Engineering, Johns Hopkins University, Baltimore, MD 21218 (United States); Hers, Sebastiaan [Energy Markets and International Environmental Policy Group, ECN Policy Studies, Energy Research Centre of the Netherlands, Amsterdam (Netherlands)

    2008-04-15

    This paper uses a static computational game theoretic model of a fully opened European electricity market and can take strategic interaction among electricity-producing firms into account. The model is run for a number of scenarios: first, in the baseline under perfect competition, the prices differ due to the presence of various generation technologies and a limited ability to exchange electricity among countries. In addition, when large firms exercise market power, the model runs indicate that prices are the highest in countries where the number of firms is low. Second, dry weather would increase the prices in the hydro-rich Nordic countries followed by the Alpine countries. The price response would be about 20% higher with market power. Third, more transmission capacity would lower the prices in countries with high prices and it also reduces the impact of market power. Hence, more transmission capacity can improve market competitiveness. (author)

  18. Apollo Lunar Module Electrical Power System Overview

    Science.gov (United States)

    Interbartolo, Michael

    2009-01-01

    Objectives include: a) Describe LM Electrical System original specifications; b) Describe the decision to change from fuel cells to batteries and other changes; c) Describe the Electrical system; and d) Describe the Apollo 13 failure from the LM perspective.

  19. Transmission rights and market power on electric power networks. 2. Physical rights

    International Nuclear Information System (INIS)

    Joskow, Paul; Tirole, Jean

    1999-01-01

    This discussion paper examines physical transmission rights where the capacity of each potentially congested interface is defined and the rights to use the congested interfaces are created and allocated in some way for suppliers and consumers. The way in which the allocation of physical rights affects competition or increases the buyers or sellers market power in the power generation market when a transmission interface is congested, and how rights markets with different microstructures allocate physical rights and determine rights prices are explored. An electricity market with physical transmission rights in the absence of capacity release rules, and physical transmission rights and market power are addressed. Loop flows, and capacity release rules are discussed. (UK)

  20. IMPULSE CONTROL HYBRID ELECTRICAL SYSTEM

    Directory of Open Access Journals (Sweden)

    A. A. Lobaty

    2016-01-01

    Full Text Available This paper extends the recently introduced approach for modeling and solving the optimal control problem of fixedswitched mode DC-DC power converter. DCDC converters are a class of electric power circuits that used extensively in regulated DC power supplies, DC motor drives of different types, in Photovoltaic Station energy conversion and other applications due to its advantageous features in terms of size, weight and reliable performance. The main problem in controlling this type converters is in their hybrid nature as the switched circuit topology entails different modes of operation, each of it with its own associated linear continuous-time dynamics.This paper analyses the modeling and controller synthesis of the fixed-frequency buck DC-DC converter, in which the transistor switch is operated by a pulse sequence with constant frequency. In this case the regulation of the DC component of the output voltage is via the duty cycle. The optimization of the control system is based on the formation of the control signal at the output.It is proposed to solve the problem of optimal control of a hybrid system based on the formation of the control signal at the output of the controller, which minimizes a given functional integral quality, which is regarded as a linear quadratic Letov-Kalman functional. Search method of optimal control depends on the type of mathematical model of control object. In this case, we consider a linear deterministic model of the control system, which is common for the majority of hybrid electrical systems. For this formulation of the optimal control problem of search is a problem of analytical design of optimal controller, which has the analytical solution.As an example of the hybrid system is considered a step-down switching DC-DC converter, which is widely used in various electrical systems: as an uninterruptible power supply, battery charger for electric vehicles, the inverter in solar photovoltaic power plants.. A

  1. Skylab technology electrical power system

    Science.gov (United States)

    Woosley, A. P.; Smith, O. B.; Nassen, H. S.

    1974-01-01

    The solar array/battery power systems for the Skylab vehicle were designed to operate in a solar inertial pointing mode to provide power continuously to the Skylab. Questions of power management are considered, taking into account difficulties caused by the reduction in power system performance due to the effects of structural failure occurring during the launching process. The performance of the solar array of the Apollo Telescope Mount Power System is discussed along with the Orbital Workshop solar array performance and the Airlock Module power conditioning group performance. A list is presented of a number of items which have been identified during mission monitoring and are recommended for electrical power system concepts, designs, and operation for future spacecraft.

  2. ELECTRICAL SUPPORT SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    S. Roy

    2004-06-24

    The purpose of this revision of the System Design Description (SDD) is to establish requirements that drive the design of the electrical support system and their bases to allow the design effort to proceed to License Application. This SDD is a living document that will be revised at strategic points as the design matures over time. This SDD identifies the requirements and describes the system design as they exist at this time, with emphasis on those attributes of the design provided to meet the requirements. This SDD has been developed to be an engineering tool for design control. Accordingly, the primary audience/users are design engineers. This type of SDD both ''leads'' and ''trails'' the design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential in performing the design process. The SDD trails the design with regard to the description of the system. The description provided in the SDD is a reflection of the results of the design process to date. Functional and operational requirements applicable to electrical support systems are obtained from the ''Project Functional and Operational Requirements'' (F&OR) (Siddoway 2003). Other requirements to support the design process have been taken from higher-level requirements documents such as the ''Project Design Criteria Document'' (PDC) (Doraswamy 2004), and fire hazards analyses. The above-mentioned low-level documents address ''Project Requirements Document'' (PRD) (Canon and Leitner 2003) requirements. This SDD contains several appendices that include supporting information. Appendix B lists key system charts, diagrams, drawings, and lists, and Appendix C includes a list of system procedures.

  3. ELECTRICAL SUPPORT SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    Roy, S.

    2004-01-01

    The purpose of this revision of the System Design Description (SDD) is to establish requirements that drive the design of the electrical support system and their bases to allow the design effort to proceed to License Application. This SDD is a living document that will be revised at strategic points as the design matures over time. This SDD identifies the requirements and describes the system design as they exist at this time, with emphasis on those attributes of the design provided to meet the requirements. This SDD has been developed to be an engineering tool for design control. Accordingly, the primary audience/users are design engineers. This type of SDD both ''leads'' and ''trails'' the design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential in performing the design process. The SDD trails the design with regard to the description of the system. The description provided in the SDD is a reflection of the results of the design process to date. Functional and operational requirements applicable to electrical support systems are obtained from the ''Project Functional and Operational Requirements'' (F andOR) (Siddoway 2003). Other requirements to support the design process have been taken from higher-level requirements documents such as the ''Project Design Criteria Document'' (PDC) (Doraswamy 2004), and fire hazards analyses. The above-mentioned low-level documents address ''Project Requirements Document'' (PRD) (Canon and Leitner 2003) requirements. This SDD contains several appendices that include supporting information. Appendix B lists key system charts, diagrams, drawings, and lists, and Appendix C includes a list of system procedures

  4. The electricity certificate system, 2009

    Energy Technology Data Exchange (ETDEWEB)

    Joehnemark, Maria; Oestberg, Roger; Johansson, Martin

    2009-07-01

    Over the years, the electricity certificate system has been maturing and consolidating, so that it is today an effective and functional policy measure that has won wide acceptance from all parties concerned. The long term approach and security of the system are attracting an increasing number of investors, which is described more fully in this report. This year's special theme chapter, Investing in Renewable Energy, presents the status of the system from an investment point of view. In addition to this chapter, the report includes, as always, an introduction to how the certificate system works, together with an updating with the latest statistics. A quick glance at external factors that can affect the system indicates that there are several that may do so in the future. Just the fact that the climate problem is still high on the political agenda, despite strong competition from economic crises, shows that there is a need for more renewable energy. The EU Renewable Energy Directive, which was adopted at the end of 2008, requires the Swedish energy system to deliver 49 % of its output from renewable sources by 2020. In addition, the Energy Bill adopted by the Swedish Parliament identifies the electricity certificate system as one of the most important means of achieving the country's objectives. Taken together, this indicates that there are many factors that will further strengthen the role of the certificate system in the next few years. If we look at the system itself, we can see that a number of important changes have been made since the previous report. With effect from 1st January 2009, the definition of electricity-intensive industries has changed, bringing it more closely in line with the definition used in energy taxation. Since 1st May, the rules have changed concerning entitlement to a new allocation period of certificates after a plant has been substantially modified. In addition, certificates can now be allocated for increases in output from

  5. Impact of Utility-Scale Distributed Wind on Transmission-Level System Operations

    Energy Technology Data Exchange (ETDEWEB)

    Brancucci Martinez-Anido, C.; Hodge, B. M.

    2014-09-01

    This report presents a new renewable integration study that aims to assess the potential for adding distributed wind to the current power system with minimal or no upgrades to the distribution or transmission electricity systems. It investigates the impacts of integrating large amounts of utility-scale distributed wind power on bulk system operations by performing a case study on the power system of the Independent System Operator-New England (ISO-NE).

  6. A new data transmission system for deep water applications

    International Nuclear Information System (INIS)

    Brown, Gerald K.

    2000-01-01

    A novel data transmission system is now available. Conventional data transmission methods include systems that require satellites, hard wires, fiber optics and other methods that do not lend themselves to buried, remote, or deep water applications. The Data Transmission System (DTS) induces a signal into a structure such as the transmission line and retrieving the signal at a distant point. In deep water applications the power required comes from an anode array that generates its own power. In addition to deep water applications, the DTS can be used in onshore, drilling, and downhole applications. With repeater stations, most lengths of gathering and transmission lines can be used. Therefore data from control valves, strain gauges, corrosion monitoring, sand monitoring, valve position and other process variables can all be transmitted. Comparisons are made between the different data transmission systems showing the advantages and disadvantages of each type with comparative costs showing the advantages of the new DTS system. (author)

  7. Solar energy thermally powered electrical generating system

    Science.gov (United States)

    Owens, William R. (Inventor)

    1989-01-01

    A thermally powered electrical generating system for use in a space vehicle is disclosed. The rate of storage in a thermal energy storage medium is controlled by varying the rate of generation and dissipation of electrical energy in a thermally powered electrical generating system which is powered from heat stored in the thermal energy storage medium without exceeding a maximum quantity of heat. A control system (10) varies the rate at which electrical energy is generated by the electrical generating system and the rate at which electrical energy is consumed by a variable parasitic electrical load to cause storage of an amount of thermal energy in the thermal energy storage system at the end of a period of insolation which is sufficient to satisfy the scheduled demand for electrical power to be generated during the next period of eclipse. The control system is based upon Kalman filter theory.

  8. A cooperative game theory approach to transmission planning in power systems

    Science.gov (United States)

    Contreras, Javier

    The rapid restructuring of the electric power industry from a vertically integrated entity into a decentralized industry has given rise to complex problems. In particular, the transmission component of the electric power system requires new methodologies to fully capture this emerging competitive industry. Game theory models are used to model strategic interactions in a competitive environment. This thesis presents a new decentralized framework to study the transmission network expansion problem using cooperative game theory. First, the players and the rules of the game are defined. Second, a coalition formation scheme is developed. Finally, the optimized cost of expansion is allocated based on the history of the coalition formation.

  9. Electricity for road transport, flexible power systems and wind power

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Lars Henrik; Ravn, H.; Meibom, P. (and others)

    2011-12-15

    The aim of the project is to analyse the potential synergistic interplay that may arise between the power sector and the transport sector, if parts of the road transport energy needs are based on electricity via the utilisation of plug-in hybrid electric vehicles and pure electric vehicles. The project focuses on the technical elements in the chain that comprises: 1: The electric vehicle status, potentials and expected development. Electric batteries are in focus in this part of the analysis. 2: Analysis of plug-in hybrid electric vehicle interacting with a local grid. 3: Analysis of grid-vehicle connection systems including technical regulation options and analysis of needs for standardisation. 4: Setting up scenarios covering potential developments for utilizing electric drive trains in road transport. Period: Up to year 2030. 5: Analysis of capacity constraints in the electricity grid (transmission and distribution) as consequence of increasing electricity demand, and new flexible consumption patterns from segments in the transport sector, and as consequence of increasing capacity on wind power in the system. 6: Setting up and analysis of combined scenarios covering both the heat and power system and the transport sector. (Author)

  10. Electrical and chemical transmission between striatal GABAergic output neurones in rat brain slices

    Science.gov (United States)

    Venance, Laurent; Glowinski, Jacques; Giaume, Christian

    2004-01-01

    Basal ganglia are interconnected subcortical nuclei, connected to the thalamus and all cortical areas involved in sensory motor control, limbic functions and cognition. The striatal output neurones (SONs), the major striatal population, are believed to act as detectors and integrators of distributed patterns of cerebral cortex inputs. Despite the key role of SONs in cortico-striatal information processing, little is known about their local interactions. Here, we report the existence and characterization of electrical and GABAergic transmission between SONs in rat brain slices. Tracer coupling (biocytin) incidence was high during the first two postnatal weeks and then decreased (postnatal days (P) 5–25, 60%; P25–30, 29%; n = 61). Electrical coupling was observed between 27% of SON pairs (coupling coefficient: 3.1 ± 0.3%, n = 89 at P15) and as shown by single-cell RT-PCR, several connexin (Cx) mRNAs were found to be expressed (Cx31.1, Cx32, Cx36 and Cx47). GABAergic synaptic transmission (abolished by bicuculline, a GABAA receptor antagonist) observed in 19% of SON pairs (n = 62) was reliable (mean failure rate of 6 ± 3%), precise (variation coefficient of latency, 0.06), strong (IPSC amplitudes of 38 ± 12 pA) and unidirectional. Interestingly, electrical and chemical transmission were mutually exclusive. These results suggest that preferential networks of electrically and chemically connected SONs, might be involved in the channelling of cortico-basal ganglia information processing. PMID:15235091

  11. Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, Alaska, and Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Kuiper, James A. [Argonne National Lab. (ANL), Argonne, IL (United States); Krummel, John R. [Argonne National Lab. (ANL), Argonne, IL (United States); Hlava, Kevin J. [Argonne National Lab. (ANL), Argonne, IL (United States); Moore, H. Robert [Argonne National Lab. (ANL), Argonne, IL (United States); Orr, Andrew B. [Argonne National Lab. (ANL), Argonne, IL (United States); Schlueter, Scott O. [Argonne National Lab. (ANL), Argonne, IL (United States); Sullivan, Robert G. [Argonne National Lab. (ANL), Argonne, IL (United States); Zvolanek, Emily A. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-11-21

    As has been noted in many reports and publications, acquiring new or expanded rights-of-way for transmission is a challenging process, because numerous land use and land ownership constraints must be overcome to develop pathways suitable for energy transmission infrastructure. In the eastern U.S., more than twenty federally protected national trails (some of which are thousands of miles long, and cross many states) pose a potential obstacle to the development of new or expanded electricity transmission capacity. However, the scope of this potential problem is not well-documented, and there is no baseline information available that could allow all stakeholders to study routing scenarios that could mitigate impacts on national trails. This report, Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). Argonne was tasked by DOE to analyze the “footprint” of the current network of National Historic and Scenic Trails and the electricity transmission system in the 37 eastern contiguous states, Alaska, and Hawaii; assess the extent to which national trails are affected by electrical transmission; and investigate the extent to which national trails and other sensitive land use types may be affected in the near future by planned transmission lines. Pipelines are secondary to transmission lines for analysis, but are also within the analysis scope in connection with the overall directives of Section 368 of the Energy Policy Act of 2005, and because of the potential for electrical transmission lines being collocated with pipelines.

  12. Quality electricity lines of external power systems electric traction DC

    Directory of Open Access Journals (Sweden)

    A.V. Petrov

    2012-08-01

    Full Text Available The results of studies that compare and analyze the numerical values of some key indicators quality electricity in the lines of the external power supply system the electric traction DC. As a supplement are additional and fundamental values of energy losses in them.

  13. [Review of wireless energy transmission system for total artificial heart].

    Science.gov (United States)

    Zhang, Chi; Yang, Ming

    2009-11-01

    This paper sums up the fundamental structure of wireless energy transmission system for total artificial heart, and compares the key parameters and performance of some representative systems. After that, it is discussed that the future development trend of wireless energy transmission system for total artificial heart.

  14. Electric Current Transmission Through Tissues of the Vestibular Labyrinth of a Patient: Perfection of the Vestibular Implant

    Science.gov (United States)

    Demkin, V. P.; Shchetinin, P. P.; Melnichuk, S. V.; Kingma, H.; Van de Berg, R.; Pleshkov, M. O.; Starkov, D. N.

    2018-03-01

    An electric model of current transmission through tissues of the vestibular labyrinth of a patient is suggested. To stimulate directly the vestibular nerve in surgical operation, terminations of the electrodes are implanted through the bone tissue of the labyrinth into the perilymph in the vicinity of the vestibular nerve. The biological tissue of the vestibular labyrinth surrounding the electrodes and having heterogeneous composition possesses conductive and dielectric properties. Thus, when a current pulse from the vestibular implant is applied to one of the electrodes, conductive disturbance currents may arise between the electrodes and the vestibular nerves that can significantly deteriorate the direct signal quality. To study such signals and to compensate for the conductive disturbance currents, an equivalent electric circuit with actual electric impedance properties of tissues of the vestibular system is suggested, and the time parameters of the conductive disturbance current transmission are calculated. It is demonstrated that these parameters can reach large values. The suggested electric model and the results of calculations can be used for perfection of the vestibular implant.

  15. The development of a subsea power transmission system for deep water boosting applications

    Energy Technology Data Exchange (ETDEWEB)

    Godinho, C.A.F. [Pirelli Cabos S.A. (Brazil); Campagnac, L.A. [Siemens S.A. (Brazil); Nicholson, A. [Tronic Electronics Services Ltd. (WEC); Magalhaes, W.M. de [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    1996-12-31

    This paper presents the development of a sub sea power transmission in medium voltage and variable frequency, as a key system for application of Boosting technology and for electrical submersible Pumping in deep water wells. This work focuses on the design and manufacture of sub sea power cables and transformers for 1,000 m water depth. 8 refs., 6 figs.

  16. Lagrangian and Hamiltonian Formulation of Transmission Line Systems with Boundary Energy Flow

    NARCIS (Netherlands)

    Jeltsema, Dimitri; Schaft, Arjan J. van der

    The classical Lagrangian and Hamiltonian formulation of an electrical transmission line is reviewed and extended to allow for varying boundary conditions, The method is based on the definition of an infinite-dimensional analogue of the affine Lagrangian and Hamiltonian input-output systems

  17. Electrical Power Supply to Offshore Oil Installations by High Voltage Direct Current Transmission

    Energy Technology Data Exchange (ETDEWEB)

    Myhre, Joergen Chr.

    2001-07-01

    This study was initiated to investigate if it could be feasible to supply offshore oil installations in the North Sea with electrical power from land. A prestudy of alternative converter topologies indicated that the most promising solution would be to investigate a conventional system with reduced synchronous compensator rating. The study starts with a summary of the state of power supply to offshore installations today, and a short review of classical HVDC transmission. It goes on to analyse how a passive network without sources influences the inverter. The transmission, with its current controlled rectifier and large inductance, is simulated as a current source. Under these circumstances the analysis shows that the network frequency has to adapt in order to keep the active and reactive power balance until the controllers are able to react. The concept of firing angle for a thyristor is limited in a system with variable frequency, the actual control parameter is the firing delay time. Sensitivity analysis showed some astonishing consequences. The frequency rises both by an increase in the active and in the reactive load. The voltage falls by an increase in the active load, but rises by an increase in the inductive load. Two different control principles for the system of inverter, synchronous compensator and load are defined. The first takes the reference for the firing delay time from the fundamental voltage at the point of common coupling. The second takes the reference for the firing delay time from the simulated EMF of the synchronous compensator. Of these, the second is the more stable and should be chosen as the basis for a possible control system. Two simulation tools are applied. The first is a quasi-phasor model running on Matlab with Simulink. The other is a time domain model in KREAN. The time domain model is primarily used for the verification of the quasi-phasor model, and shows that quasi-phasors is still a valuable tool for making a quick analysis

  18. Insulation systems for superconducting transmission cables

    DEFF Research Database (Denmark)

    Tønnesen, Ole

    1996-01-01

    the electrical insulation is placed outside both the superconducting tube and the cryostat. The superconducting tube is cooled by liquid nitrogen which is pumped through the hollow part of the tube.2) The cryogenic dielectric design, where the electrical insulation is placed inside the cryostat and thus is kept...

  19. Study of National Electric System equipment until 2000 year

    International Nuclear Information System (INIS)

    1980-01-01

    The report by the German firm Lahmeyer International is about the historical development of the supply of Electric Power, description of the current system, previous studies, organization, power plants, hydroelectric plants and existing construction, transmission system, hydrological studies and water resources, operation of hydro thermal generation, medium-term demand, energy sources and generation in the medium term, list of thermal plants, evaluation of alternative equipment plans in Uruguay at a med dium term.

  20. Alternative forms of energy transmission from OTEC plants. [Chemical and electrical

    Energy Technology Data Exchange (ETDEWEB)

    Konopka, A.; Biederman, N.; Talib, A.; Yudow, B.

    1977-01-01

    The transmission of OTEC-derived chemical and electrical energy is compared. The chemical energy-carriers considered are the following: gaseous and liquid hydrogen, liquid ammonia, methanol, gasoline, hydrazine hydrate, anhydrous hydrazine, unsymmetrical dimethylhydrazine (UDMH), 1,7-Octadiyne, and tetrahydrodicyclopentadiene. The assessment assumes that each of the above energy carriers were transported by barge and/or pipeline. The delivered costs were then compared with transmission of electricity by submarine cables. Because chemical and electrical energy are not equivalent, however, their comparison can only be done after the outputs are converted to a common form. Thus, in addition to presenting the delivered cost and overall energy efficiency of the chemical energy-carriers, we have provided a discussion of the equipment, costs, and efficiencies of converting the hydrogen and ammonia delivered into electricity, and the electricity delivered into hydrogen and ammonia. A concise technical assessment and economic analysis of components associated with the conversion, storage, transportation, and shore-based receiving facilities for the conversion of OTEC mechanical energy to chemical energy is provided and compared to the conversion and transmission of electrical power. Results concerning the hydrogen and ammonia analysis were determined as part of the OTEC program at IGT from May 1975 through May 1976 under Contract No. NSF-C1008 (AER-75-00033) with the National Science Foundation and ERDA. Information concerning carbonaceous fuels and high-energy fuels production was developed as part of the current IGT OTEC program under Contract No. E(49-18)-2426 with ERDA.

  1. Transmission techniques for emergent multicast and broadcast systems

    CERN Document Server

    da Silva, Mario Marques; Dinis, Rui; Souto, Nuno; Silva, Joao Carlos

    2010-01-01

    Describing efficient transmission schemes for broadband wireless systems, Transmission Techniques for Emergent Multicast and Broadcast Systems examines advances in transmission techniques and receiver designs capable of supporting the emergent wireless needs for multimedia broadcast and multicast service (MBMS) requirements. It summarizes the research and development taking place in wireless communications for multimedia MBMS and addresses the means to improved spectral efficiency to allow for increased user bit rate, as well as increased capacity of the digital cellular radio network.The text

  2. A Model for Optimizing the Combination of Solar Electricity Generation, Supply Curtailment, Transmission and Storage

    Science.gov (United States)

    Perez, Marc J. R.

    With extraordinary recent growth of the solar photovoltaic industry, it is paramount to address the biggest barrier to its high-penetration across global electrical grids: the inherent variability of the solar resource. This resource variability arises from largely unpredictable meteorological phenomena and from the predictable rotation of the earth around the sun and about its own axis. To achieve very high photovoltaic penetration, the imbalance between the variable supply of sunlight and demand must be alleviated. The research detailed herein consists of the development of a computational model which seeks to optimize the combination of 3 supply-side solutions to solar variability that minimizes the aggregate cost of electricity generated therefrom: Storage (where excess solar generation is stored when it exceeds demand for utilization when it does not meet demand), interconnection (where solar generation is spread across a large geographic area and electrically interconnected to smooth overall regional output) and smart curtailment (where solar capacity is oversized and excess generation is curtailed at key times to minimize the need for storage.). This model leverages a database created in the context of this doctoral work of satellite-derived photovoltaic output spanning 10 years at a daily interval for 64,000 unique geographic points across the globe. Underpinning the model's design and results, the database was used to further the understanding of solar resource variability at timescales greater than 1-day. It is shown that--as at shorter timescales--cloud/weather-induced solar variability decreases with geographic extent and that the geographic extent at which variability is mitigated increases with timescale and is modulated by the prevailing speed of clouds/weather systems. Unpredictable solar variability up to the timescale of 30 days is shown to be mitigated across a geographic extent of only 1500km if that geographic extent is oriented in a north

  3. Safety analyses of the electrical systems on VVER NPP

    International Nuclear Information System (INIS)

    Andel, J.

    2004-01-01

    Energoprojekt Praha has been the main entity responsible for the section on 'Electrical Systems' in the safety reports of the Temelin, Dukovany and Mochovce nuclear power plants. The section comprises 2 main chapters, viz. Offsite Power System (issues of electrical energy production in main generators and the link to the offsite transmission grid) and Onsite Power Systems (AC and DC auxiliary system, both normal and safety related). In the chapter on the off-site system, attention is paid to the analysis of transmission capacity of the 400 kV lines, analysis of transient stability, multiple fault analyses, and probabilistic analyses of the grid and NPP power system reliability. In the chapter on the on-site system, attention is paid to the power balances of the electrical sources and switchboards set for various operational and accident modes, checks of loading and function of service and backup sources, short circuit current calculations, analyses of electrical protections, and analyses of the function and sizing of emergency sources (DG sets and UPS systems). (P.A.)

  4. Consumption, price asymmetries, transmission congestion and market power in the Norwegian electricity market

    Energy Technology Data Exchange (ETDEWEB)

    Mirza, Faisal Mehmood

    2011-07-01

    The results from this dissertation add to the ongoing debate in Norway if NordPool spot should shift from zonal price scheme to the nodal price scheme. Academically, the individual papers provide a number of theoretical frameworks that are helpful in analyzing electricity markets around the world. The PhD dissertation investigates price determination process in the Norwegian electricity market and evaluates if the market works at perfectly competitive level or producers exercise market power to drive prices away from their marginal cost of production. Using aggregate hourly electricity supply and demand data, the empirical analysis carried out in this dissertation leads to the following conclusions. 1. Market power at the generation level is not a major problem for the Norwegian electricity market. On average, when we consider the events of binding transmission capacity as exogenous, the average markup in economic terms is small and has not exceeded one percent. 2. Producers can use the information on available transmission capacity between different price areas in Norway and restrict their output to induce transmission congestion in their price area to exercise market power. Average markup during such instances has remained high at 20 percent. 3. Transmission capacity in Norway is not being optimally utilized as import capacity remains at its lowest level during the hours when southern Norway is generally a net importer of electricity, when compared to the rest of the hours of the day. 4. A segment of electricity retailers in the Norwegian electricity market exercises its market power by controlling the pass-through of price changes in the wholesale market to the retail market for variable price contract consumers. The pass-through is asymmetric, whereby cost increase is transmitted completely and quickly when compared to the case of cost decrease. 5.The Daylight saving time (Summer time) policy is helpful in ensuring energy efficiency. It results in electricity

  5. Study of electric and magnetic fields on transmission lines using a computer simulation program

    International Nuclear Information System (INIS)

    Robelo Mojica, Nelson

    2011-01-01

    A study was conducted to determine and reduce levels of electric and magnetic fields with different configurations used by the Instituto Costarricense de Electricidad in power transmission lines in Costa Rica. The computer simulation program PLS-CADD with EPRI algorithm has been used to obtain field values close to those actual to lines easements that have worked to date. Different configurations have been compared on equal terms and the lowest levels of electric and magnetic fields are determined. The most appropriate configuration of the tower has been obtained and therefore has decreased exposure to electromagnetic fields people, without affecting the energy demand of the population. (author) [es

  6. Hybrid electric vehicle power management system

    Science.gov (United States)

    Bissontz, Jay E.

    2015-08-25

    Level voltage levels/states of charge are maintained among a plurality of high voltage DC electrical storage devices/traction battery packs that are arrayed in series to support operation of a hybrid electric vehicle drive train. Each high voltage DC electrical storage device supports a high voltage power bus, to which at least one controllable load is connected, and at least a first lower voltage level electrical distribution system. The rate of power transfer from the high voltage DC electrical storage devices to the at least first lower voltage electrical distribution system is controlled by DC-DC converters.

  7. Probabilistic Fault Diagnosis in Electrical Power Systems

    Data.gov (United States)

    National Aeronautics and Space Administration — Electrical power systems play a critical role in spacecraft and aircraft. This paper discusses our development of a diagnostic capability for an electrical power...

  8. Gas data transmission system by satellite telephone; Systeme de transmission de donnees sur le gaz utilisant le telephone par satellite

    Energy Technology Data Exchange (ETDEWEB)

    Ogasawara, S.; Tanji, A. [Dengineer Co., Ltd (Japan); Akiyama, S. [Buyo Gas Company (Japan)

    2000-07-01

    Dengineer Co., Ltd. and Buyo Gas Co., Ltd. had been developing and using the data and alarm transmission system by public telephone since 1984, that was first practical use in Japan. It is very important for business management that adjusts the production value of gas by measuring gas pressures in each governor. Also, it is indispensable to know the accident of gas leakage or abnormal gas pressure quickly. But this convenient system is not spread yet in Japanese market cause of the following reasons. - Take time and cost for installation of terminal station. - Terminal station is apt to damage by thunder. - Big disaster must stop working this system. In order to solve those problems, we have developed and tested the system organized of the satellite telephone system and solar cells for power. This system will be very useful for wide place, not only Japanese market but also the area, which has no electricity and phone. Also, it will be convenient for international rescue as is able to access it from the foreign countries. (authors)

  9. A strategic review of electricity systems models

    International Nuclear Information System (INIS)

    Foley, A.M.; O Gallachoir, B.P.; McKeogh, E.J.; Hur, J.; Baldick, R.

    2010-01-01

    Electricity systems models are software tools used to manage electricity demand and the electricity systems, to trade electricity and for generation expansion planning purposes. Various portfolios and scenarios are modelled in order to compare the effects of decision making in policy and on business development plans in electricity systems so as to best advise governments and industry on the least cost economic and environmental approach to electricity supply, while maintaining a secure supply of sufficient quality electricity. The modelling techniques developed to study vertically integrated state monopolies are now applied in liberalised markets where the issues and constraints are more complex. This paper reviews the changing role of electricity systems modelling in a strategic manner, focussing on the modelling response to key developments, the move away from monopoly towards liberalised market regimes and the increasing complexity brought about by policy targets for renewable energy and emissions. The paper provides an overview of electricity systems modelling techniques, discusses a number of key proprietary electricity systems models used in the USA and Europe and provides an information resource to the electricity analyst not currently readily available in the literature on the choice of model to investigate different aspects of the electricity system. (author)

  10. Convective Heat Transfer Coefficients of Automatic Transmission Fluid Jets with Implications for Electric Machine Thermal Management: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Bennion, Kevin; Moreno, Gilberto

    2015-09-29

    Thermal management for electric machines (motors/ generators) is important as the automotive industry continues to transition to more electrically dominant vehicle propulsion systems. Cooling of the electric machine(s) in some electric vehicle traction drive applications is accomplished by impinging automatic transmission fluid (ATF) jets onto the machine's copper windings. In this study, we provide the results of experiments characterizing the thermal performance of ATF jets on surfaces representative of windings, using Ford's Mercon LV ATF. Experiments were carried out at various ATF temperatures and jet velocities to quantify the influence of these parameters on heat transfer coefficients. Fluid temperatures were varied from 50 degrees C to 90 degrees C to encompass potential operating temperatures within an automotive transaxle environment. The jet nozzle velocities were varied from 0.5 to 10 m/s. The experimental ATF heat transfer coefficient results provided in this report are a useful resource for understanding factors that influence the performance of ATF-based cooling systems for electric machines.

  11. Electric vehicle system for charging and supplying electrical power

    Science.gov (United States)

    Su, Gui Jia

    2010-06-08

    A power system that provides power between an energy storage device, an external charging-source/load, an onboard electrical power generator, and a vehicle drive shaft. The power system has at least one energy storage device electrically connected across a dc bus, at least one filter capacitor leg having at least one filter capacitor electrically connected across the dc bus, at least one power inverter/converter electrically connected across the dc bus, and at least one multiphase motor/generator having stator windings electrically connected at one end to form a neutral point and electrically connected on the other end to one of the power inverter/converters. A charging-sourcing selection socket is electrically connected to the neutral points and the external charging-source/load. At least one electronics controller is electrically connected to the charging-sourcing selection socket and at least one power inverter/converter. The switch legs in each of the inverter/converters selected by the charging-source/load socket collectively function as a single switch leg. The motor/generators function as an inductor.

  12. ELECTRICAL POWER SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    M. Maniyar

    2004-06-22

    The purpose of this revision of the System Description Document (SDD) is to establish requirements that drive the design of the electrical power system and their bases to allow the design effort to proceed to License Application. This SDD is a living document that will be revised at strategic points as the design matures over time. This SDD identifies the requirements and describes the system design as they exist at this time, with emphasis on those attributes of the design provided to meet the requirements. This SDD has been developed to be an engineering tool for design control. Accordingly, the primary audience are design engineers. This type of SDD leads and follows the design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential to performing the design process. This SDD follows the design with regard to the description of the system. The description provided in the SDD is a reflection of the results of the design process to date. Functional and operational requirements applicable to this system are obtained from ''Project Functional and Operational Requirements'' (F&OR) (Siddoway, 2003). Other requirements to support the design process have been taken from higher level requirements documents such as ''Project Design Criteria Document'' (PDC) (Doraswamy 2004), the fire hazards analyses, and the preclosure safety analysis. The above mentioned low-level documents address ''Project Requirements Document'' (PRD) (Canori and Leitner 2003) requirements. This SDD includes several appendices with supporting information. Appendix B lists key system charts, diagrams, drawings, and lists; and Appendix C is a list of system procedures.

  13. Switched causual modeling of transmission with clutch in hybrid electric vehicles

    OpenAIRE

    LHOMME, W; TRIGUI, R; DELARU, P; JEANNERET, B; BOUSCAUROL, A; BADIN, F

    2008-01-01

    Certain difficulties arise when attempting to model a clutch in a power train transmission due to its nonlinear behavior. Two different states have to be taken into account-the first being when the clutch is locked and the second being when the clutch is slipping. In this paper, a clutch model is developed using the Energetic Macroscopic Representation, which is, in turn, used in the modeling of complete hybrid electric vehicles (HEVs). Two different models are used, and a specific condition ...

  14. Multicore fibers for high-capacity submarine transmission systems

    DEFF Research Database (Denmark)

    Nooruzzaman, Md.; Morioka, Toshio

    2018-01-01

    Applications of multicore fibers (MCFs) in undersea transmission systems are investigated, and various potential architectures of branching units for MCF-based undersea transmission systems are presented. Some MCF-based submarine network architectures based on the amount of data traffic are also...

  15. Optimum transmission system expansion offshore considering renewable energy sources

    NARCIS (Netherlands)

    Torbaghan, Shahab S.; Gibescu, Madeleine

    2017-01-01

    This chapter provides an overview of transmission expansion planning (TEP) methods and their practical application. First, it discusses the strategic importance of the transmission system. Next, it describes the reasons why TEP remains a challenge for systems with a large share of renewable energy.

  16. 47 CFR 73.1350 - Transmission system operation.

    Science.gov (United States)

    2010-10-01

    ... interference. (e) If a broadcast station is operating in a manner that poses a threat to life or property or... 47 Telecommunication 4 2010-10-01 2010-10-01 false Transmission system operation. 73.1350 Section... RADIO BROADCAST SERVICES Rules Applicable to All Broadcast Stations § 73.1350 Transmission system...

  17. Research on Poppers Used as Electrical Connectors in High Speed Textile Transmission Lines

    Directory of Open Access Journals (Sweden)

    Leśnikowski Jacek

    2016-12-01

    Full Text Available This paper presents results of research on poppers used as electrical connectors connecting fragments of textile signal lines. These lines can be used in intelligent clothing for connecting electronic modules implemented in it. Intelligent (smart clothing can be used, among others, in the health monitoring of the elderly, newborn babies, or people working in hazardous conditions, for example, firefighters and soldiers. The aim of the present study was to examine the usefulness of poppers, widely used in clothing, as electrical connectors connecting parts of the textile signal lines designed for transmission of high-speed digital signals. The paper presents examples of measured parameters characterizing transmission properties of two fragments of the coplanar, textile transmission line connected to each other using conventional poppers. The presented measurement results contain the so-called s parameters, characteristic impedance of the poppers, and eye measurements characterizing distortions of digital signals passing through the tested line. In the article, the effect of temperature and humidity of air surrounding the tested poppers on their characteristic impedance was also presented. This property and its stability are important in signal lines designed for high-speed data transmission.

  18. Hybrid ellipsoidal fuzzy systems in forecasting regional electricity loads

    Energy Technology Data Exchange (ETDEWEB)

    Pai, Ping-Feng [Department of Information Management, National Chi Nan University, 1 University Road, Puli, Nantou 545, Taiwan (China)

    2006-09-15

    Because of the privatization of electricity in many countries, load forecasting has become one of the most crucial issues in the planning and operations of electric utilities. In addition, accurate regional load forecasting can provide the transmission and distribution operators with more information. The hybrid ellipsoidal fuzzy system was originally designed to solve control and pattern recognition problems. The main objective of this investigation is to develop a hybrid ellipsoidal fuzzy system for time series forecasting (HEFST) and apply the proposed model to forecast regional electricity loads in Taiwan. Additionally, a scaled conjugate gradient learning method is employed in the supervised learning phase of the HEFST model. Subsequently, numerical data taken from the existing literature is used to demonstrate the forecasting performance of the HEFST model. Simulation results reveal that the proposed model has better forecasting performance than the artificial neural network model and the regression model. Thus, the HEFST model is a valid and promising alternative for forecasting regional electricity loads. (author)

  19. Underwater electric field detection system based on weakly electric fish

    Science.gov (United States)

    Xue, Wei; Wang, Tianyu; Wang, Qi

    2018-04-01

    Weakly electric fish sense their surroundings in complete darkness by their active electric field detection system. However, due to the insufficient detection capacity of the electric field, the detection distance is not enough, and the detection accuracy is not high. In this paper, a method of underwater detection based on rotating current field theory is proposed to improve the performance of underwater electric field detection system. First of all, we built underwater detection system based on the theory of the spin current field mathematical model with the help of the results of previous researchers. Then we completed the principle prototype and finished the metal objects in the water environment detection experiments, laid the foundation for the further experiments.

  20. Concept design of the high voltage transmission system for the collider tunnel

    International Nuclear Information System (INIS)

    Norman, L.S.

    1992-03-01

    In order to provide electrical service to the Superconducting Super Collider Laboratory (SSCL) 54-mile-circumference collider of 125 MVA at 69 kV or 155 MVA at 138 kV of distributed power, it must be demonstrated that the concept design for a high-voltage transmission system can meet the distribution requirements of the collider electrical system with its cryogenic system's large motor loads and its pulsed power technical systems. It is a practical design, safe for operating personnel and cost-effective. The normal high-voltage transmission techniques of overhead and underground around the 54-mile collider tunnel could not be applied because of technical and physical constraints, or was environmentally unacceptable. The approach taken to solve these problems is the installation of 69-kV or 138-kV exposed solid dielectric transmission cable inside the collider tunnel with the superconducting magnets, cryogenic piping, electrical medium, and low-voltage distribution systems, and electronic/instrumentation wiring systems. This mixed-use approach has never been attempted in a collider tunnel. Research into all aspects of the engineering and installation problems and consultation with transmission cable manufacturers, electrical utilities, and European entities with similar installations -- such as the Channel Tunnel -- demonstrate that the concept design is feasible and practical. This paper presents a history of the evolution of the concept design. Design studies are underway to determine the system configuration and voltages. Included in this report are tunnel transmission cable system considerations and evaluation of solid dielectric high-voltage cable design

  1. Concept design of the high-voltage transmission system for the collider tunnel

    International Nuclear Information System (INIS)

    Norman, L.S.

    1992-01-01

    In order to provide electrical service to the Superconducting Super Collider Laboratory (SSCL) 54-mile-circumference collider of 125 MVA at 69 kV or 155 MVA at 138 kV of distributed power, it must be demonstrated that the concept design for a high-voltage transmission system can meet the distribution requirements of the collider electrical system with its cryogenic system's large motor loads and its pulsed power technical systems. It is a practical design, safe for operating personnel and cost-effective. The normal high-voltage transmission techniques of overhead and underground around the 54-mile collider tunnel could not be applied because of technical and physical constraints, or was environmentally unacceptable. The approach taken to solve these problems is the installation of 69-kV or 138-kV exposed solid dielectric transmission cable inside the collider tunnel with the superconducting magnets, cryogenic piping, electrical medium, and low-voltage distribution systems, and electronic/instrumentation wiring systems. This mixed-use approach has never been attempted in a collider tunnel. Research into all aspects of the engineering and installation problems and consultation with transmission cable manufacturers, electrical utilities, and European entities with similar installations-such as the Channel Tunnel-demonstrate that the concept design is feasible and practical. This paper presents a history of the evolution of the concept design. Design studies are underway to determine the system configuration and voltages. Included in this report are tunnel transmission cable system considerations and evaluation of solid dielectric high-voltage cable design

  2. Research Study Towards a MEFFV Electric Armament System

    National Research Council Canada - National Science Library

    Pappas, J

    2004-01-01

    .... One vehicle variant seeks to exploit synergies between electric mobility and electric armament systems by employing a hybrid electric mobility propulsion system and an electric gun for an all Electric MEFFV...

  3. Audit of the process of determination of available cross-border electricity transmission capacity in the Netherlands

    International Nuclear Information System (INIS)

    Haubrich, H.J.; Fritz, W.

    2001-02-01

    The objective of this audit has been to analyse and to evaluate the process of determination of available cross-border electricity transmission capacity in the Netherlands as applied by the Dutch transmission system operator TenneT. In particular, the scope has been to give a survey of the corresponding responsibilities of TenneT as defined primarily by the Dutch Grid Code, to analyse the way TenneT fulfils these responsibilities, and to analyse and evaluate the decisions taken and the methods applied by TenneT for each step of this process. In addition, recommendations regarding possibilities of netting imports and exports in day-ahead capacity allocation have been requested. We have based this audit on comprehensive meetings with TenneT, on publicly available documents mainly from DTe and TenneT, and on non-public documents made available to us by TenneT. 26 refs

  4. Asset life and pricing the use of electricity transmission infrastructure in Chile

    International Nuclear Information System (INIS)

    Raineri, Ricardo

    2010-01-01

    Beyond the different approaches to set regulated prices for the use of infrastructure, a key parameter to determine regulated tariffs is the concept of asset life and how it changes with changes in the economic and regulatory context, which determines the optimal infrastructure investment and replacement policies. In this paper we look at the effects that changes in demand, the presence of substitutes and complements, the regulatory framework - both a pro or an anticompetitive framework -, scale economies, and the investment planning horizon, have on the economic service life of an asset and the tariffs for its use. We find that as the electric industry becomes more competitive, a negative effect on the economic service life of electric electricity transmission should be expected. Also, numerical experiments illustrate an inverse relation between scale economies on investment and the ESL of electricity transmission infrastructure. Further, we look at the biases on optimal investment that happen when optimal plans do not observe the life cycle of the investments and the ESL of the equipment, as well as the inconsistency and biases on optimal investment and replacement policies that might result when the Social Planner optimal investment plan lacks of a long-term commitment. (author)

  5. Asset life and pricing the use of electricity transmission infrastructure in Chile

    Energy Technology Data Exchange (ETDEWEB)

    Raineri, Ricardo [Pontificia Universidad Catolica de Chile, Av. Vicuna Mackenna 4860, Santiago (Chile)

    2010-01-15

    Beyond the different approaches to set regulated prices for the use of infrastructure, a key parameter to determine regulated tariffs is the concept of asset life and how it changes with changes in the economic and regulatory context, which determines the optimal infrastructure investment and replacement policies. In this paper we look at the effects that changes in demand, the presence of substitutes and complements, the regulatory framework - both a pro or an anticompetitive framework -, scale economies, and the investment planning horizon, have on the economic service life of an asset and the tariffs for its use. We find that as the electric industry becomes more competitive, a negative effect on the economic service life of electric electricity transmission should be expected. Also, numerical experiments illustrate an inverse relation between scale economies on investment and the ESL of electricity transmission infrastructure. Further, we look at the biases on optimal investment that happen when optimal plans do not observe the life cycle of the investments and the ESL of the equipment, as well as the inconsistency and biases on optimal investment and replacement policies that might result when the Social Planner optimal investment plan lacks of a long-term commitment. (author)

  6. An optimization framework for the integrated planning of generation and transmission expansion in interconnected power systems

    International Nuclear Information System (INIS)

    Guerra, Omar J.; Tejada, Diego A.; Reklaitis, Gintaras V.

    2016-01-01

    Highlights: • A novel optimization framework for the design and planning of interconnected power systems is proposed. • The framework integrates generation and transmission capacity expansion planning. • Reserve and emission constraints are included. • Business as usual and CO_2 mitigation policy scenarios are evaluated. • Reconfiguration of existing power generation technologies is the most cost-effective option for CO_2 emissions mitigation. - Abstract: Energy, and particularly electricity, has played and will continue to play a very important role in the development of human society. Electricity, which is the most flexible and manageable energy form, is currently used in a variety of activities and applications. For instance, electricity is used for heating, cooling, lighting, and for operating electronic appliances and electric vehicles. Nowadays, given the rapid development and commercialization of technologies and devices that rely on electricity, electricity demand is increasing faster than overall primary energy supply. Consequently, the design and planning of power systems is becoming a progressively more important issue in order to provide affordable, reliable and sustainable energy in timely fashion, not only in developed countries but particularly in developing economies where electricity demand is increasing even faster. Power systems are networks of electrical devices, such as power plants, transformers, and transmission lines, used to produce, transmit, and supply electricity. The design and planning of such systems require the selection of generation technologies, along with the capacity, location, and timing of generation and transmission capacity expansions to meet electricity demand over a long-term horizon. This manuscript presents a comprehensive optimization framework for the design and planning of interconnected power systems, including the integration of generation and transmission capacity expansion planning. The proposed

  7. Deregulating with no regulator: Is the German electricity transmission regime institutionally correct?

    International Nuclear Information System (INIS)

    Glachant, Jean-Michel; Dubois, Ute; Perez, Yannick

    2008-01-01

    From 1998 to 2005, the German transmission grid has been put under a self-regulated arrangement. It seems hard to believe that transmission lines can be opened to 'third-party access' only with a 'negotiated access regime' and no regulator supervision. It seems contradictory with the notion of 'ex post contractual hazards' promoted by V. Goldberg and O. Williamson. If a weak institutional arrangement is implemented, one might assume that it has to be harmful to network and market access. If it is not to be inefficient, why and how could it work? When looking at rules and prices for accessing the transmission network and the corresponding wholesale markets in Germany, the 'club' arrangement for transmission opening does not appear so harmful. Accordingly, we have to reconsider the ex ante and ex post institutional mechanism of such a 'club' arrangement. Ex ante, we first reconsider skills and strengths of industrial consumers and German Business associations in defining and assessing rules of transmission access. We underline that incomplete vertical and horizontal integration of German electricity companies impeded extensive cartel collusion. Ex post, we first look at a strong Competition Authority backing. Then we discover that ex ante and ex post dimensions are much more mixed and reinforced in an open 'cumulative pro-competition process' framed by the Competition Authority

  8. Transmission Characteristics of an OFDM signal for Power Line Communication System with High Bit Rate

    Science.gov (United States)

    Mori, Akira; Watanabe, Yosuke; Tokuda, Masamitsu; Kawamoto, Koji

    In this paper, we measured what influence the sinusoidal transmission characteristics of the electric power line with various forms gave to the transmission characteristic of OFDM (Orthogonal Frequency Division Multiplexing) signal through PLC (power line communication system) modem. We classified the electric power line transmission line with various forms in a real environment into two basic elements, which are an outlet type branch and a switch type branch. Next, PHY rate (Physical rate) is measured for each basic element connected with the PLC modem. At this time, the transmission characteristics of the electric power line are simulated from measured data. OFDM sending and receiving systems are composed on the computer, and the PHY rate is simulated. By comparing with measured and calculated values, it is revealed that PHY rate of PLC modem is most affected in the case of the power line transmission characteristics having broad band and high level attenuation and group delay variation, and is not affected in the case of that having narrow band attenuation and group delay variation.

  9. Air pollution restrictions in electrical production system

    International Nuclear Information System (INIS)

    Gallizioli, G.

    1993-01-01

    A description of the principal characteristics regarding the Italian electrical power system and the evolution of standardization in air pollution control is given. Afterwards, ENEL (the Italian National Electricity Board) actions in the environmental protection field (with particular respect to thermo-electrical production) are presented. Finally, principal ENEL research programs on new air pollution control technologies are discussed

  10. Security of the data transmission in the industrial control system

    Directory of Open Access Journals (Sweden)

    Marcin Bednarek

    2015-12-01

    Full Text Available The theme of this paper is to present the data transmission security system between the stations of the industrial control system. The possible options for secure communications between process stations, as well as between process and operator station are described. Transmission security mechanism is based on algorithms for symmetric and asymmetric encryption. The authentication process uses a software token algorithm and a one-way hash function. The algorithm for establishing a secured connection between the stations, including the authentication process and encryption of data transmission is given. The process of securing the transmission consists of 4 sub-processes: (I authentication; (II asymmetric, public keys transmission; (III symmetric key transmission; (IV data transmission. The presented process of securing the transmission was realized in the industrial controller and emulator. For this purpose, programming languages in accordance with EN 61131 were used. The functions were implemented as user function blocks. This allows us to include a mixed code in the structure of the block (both: ST and FBD. Available function categories: support of the asymmetric encryption; asymmetric encryption utility functions; support of the symmetric encryption; symmetric encryption utility functions; support of the hash value calculations; utility functions of conversion.[b]Keywords[/b]: transmission security, encryption, authentication, industrial control system

  11. Strategic Generation with Conjectured Transmission Price Responses in a Mixed Transmission Pricing System. Part 1. Formulation

    International Nuclear Information System (INIS)

    Hobbs, B.F.; Rijkers, F.A.M.

    2004-05-01

    The conjectured supply function (CSF) model calculates an oligopolistic equilibrium among competing generating companies (GenCos), presuming that GenCos anticipate that rival firms will react to price increases by expanding their sales at an assumed rate. The CSF model is generalized here to include each generator's conjectures concerning how the price of transmission services (point-to-point service and constrained interfaces) will be affected by the amount of those services that the generator demands. This generalization reflects the market reality that large producers will anticipate that they can favorably affect transmission prices by their actions. The model simulates oligopolistic competition among generators while simultaneously representing a mixed transmission pricing system. This mixed system includes fixed transmission tariffs, congestion-based pricing of physical transmission constraints (represented as a linearized dc load flow), and auctions of interface capacity in a path-based pricing system. Pricing inefficiencies, such as export fees and no credit for counterflows, can be simulated. The model is formulated as a linear mixed complementarity problem, which enables very large market models to be solved. In the second paper of this two-paper series, the capabilities of the model are illustrated with an application to northwest Europe, where transmission pricing is based on such a mixture of approaches

  12. Strategic Generation with Conjectured Transmission Price Responses in a Mixed Transmission Pricing System. Part 2. Application

    International Nuclear Information System (INIS)

    Wals, A.F.; Hobbs, B.F.; Rijkers, F.A.M.

    2004-05-01

    The conjectured transmission price response model presented in the first of this two-paper series considers the expectations of oligopolistic generators regarding how demands for transmission services affect the prices of those services. Here, the model is applied to northwest Europe, simulating a mixed transmission pricing system including export fees, a path-based auction system for between-country interfaces, and implicit congestion-based pricing of internal country constraints. The path-based system does not give credit for counterflows when calculating export capability. The application shows that this no-netting policy can exacerbate the economic inefficiencies caused by oligopolistic pricing by generators. The application also illustrates the effects of different generator conjectures regarding rival supply responses and transmission prices. If generators anticipate that their increased demand for transmission services will increase transmission prices, then competitive intensity diminishes and energy prices rise. In the example here, the effect of this anticipation is to double the price increase that results from oligopolistic (Cournot) competition among generators

  13. Research on Travel Control System of Hydrostatic Transmission Chassis

    Directory of Open Access Journals (Sweden)

    Zhao Liang

    2017-01-01

    Full Text Available Aiming at the control problem of driving system of hydrostatic transmission chassis, the composition of the control system of hydrostatic transmission chassis is introduced and the control method of dual engine is solved. According to the number of driving axles in driving process, The external characteristic curve of the engine controls the variable hydraulic pump by one parameter, controls the rotational speed of the variable hydraulic motor according to the change of the vehicle speed, and introduces the control flow of the brake system. It provides a reference for the design of driving control system of multi-axis hydrostatic transmission chassis.

  14. Efficient design of multituned transmission line NMR probes: the electrical engineering approach.

    Science.gov (United States)

    Frydel, J A; Krzystyniak, M; Pienkowski, D; Pietrzak, M; de Sousa Amadeu, N; Ratajczyk, T; Idzik, K; Gutmann, T; Tietze, D; Voigt, S; Fenn, A; Limbach, H H; Buntkowsky, G

    2011-01-01

    Transmission line-based multi-channel solid state NMR probes have many advantages regarding the cost of construction, number of RF-channels, and achievable RF-power levels. Nevertheless, these probes are only rarely employed in solid state-NMR-labs, mainly owing to the difficult experimental determination of the necessary RF-parameters. Here, the efficient design of multi-channel solid state MAS-NMR probes employing transmission line theory and modern techniques of electrical engineering is presented. As technical realization a five-channel ((1)H, (31)P, (13)C, (2)H and (15)N) probe for operation at 7 Tesla is described. This very cost efficient design goal is a multi port single coil transmission line probe based on the design developed by Schaefer and McKay. The electrical performance of the probe is determined by measuring of Scattering matrix parameters (S-parameters) in particular input/output ports. These parameters are compared to the calculated parameters of the design employing the S-matrix formalism. It is shown that the S-matrix formalism provides an excellent tool for examination of transmission line probes and thus the tool for a rational design of these probes. On the other hand, the resulting design provides excellent electrical performance. From a point of view of Nuclear Magnetic Resonance (NMR), calibration spectra of particular ports (channels) are of great importance. The estimation of the π/2 pulses length for all five NMR channels is presented. Copyright © 2011 Elsevier Inc. All rights reserved.

  15. Thermo-electrical systems for the generation of electricity

    International Nuclear Information System (INIS)

    Bitschi, A.; Froehlich, K.

    2010-01-01

    This article takes a look at theoretical models concerning thermo-electrical systems for the generation of electricity and demonstrations of technology actually realised. The potentials available and developments are discussed. The efficient use of energy along the whole generation and supply chain, as well as the use of renewable energy sources are considered as being two decisive factors in the attainment of a sustainable energy supply system. The large amount of unused waste heat available today in energy generation, industrial processes, transport systems and public buildings is commented on. Thermo-electric conversion systems are discussed and work being done on the subject at the Swiss Federal Institute of Technology in Zurich is discussed. The findings are discussed and results are presented in graphical form

  16. Electric cars as mobile power storage systems

    International Nuclear Information System (INIS)

    Herzog, B.

    2010-01-01

    This article discusses the use of electric cars as a means of optimising the use of renewable energy sources. Charging the cars' batteries during periods when cheap electricity prices prevail and then using excess capacity to supply the mains with electricity during periods of peak demand is discussed. The possible use of wind for power generation is discussed and a system proposed by a leading supplier of electrical apparatus and systems is examined. Two examples of electric cars and associated power chains are looked at and tests in everyday practice are described

  17. Home electrical system safety in Italy

    Energy Technology Data Exchange (ETDEWEB)

    Auditor,

    1990-06-01

    Italy, amongst the industrialized countries, has the highest mortality rate due to accidents associated with the improper use or maintenance of home electrical systems. The increasing use of domestic electrical appliances has raised the risk of accidents, especially in homes equipped with out-dated, low-capacity electrical plants and worn wiring. Within this context, this paper reports on the results of survey to establish the worthiness and type of electrical systems in use in a sample of 1,000 residential buildings. The paper then assesses the efficacy of recent normatives designed to increase the safety and efficiency of home electrical installations.

  18. Hybrid and Electric Advanced Vehicle Systems Simulation

    Science.gov (United States)

    Beach, R. F.; Hammond, R. A.; Mcgehee, R. K.

    1985-01-01

    Predefined components connected to represent wide variety of propulsion systems. Hybrid and Electric Advanced Vehicle System (HEAVY) computer program is flexible tool for evaluating performance and cost of electric and hybrid vehicle propulsion systems. Allows designer to quickly, conveniently, and economically predict performance of proposed drive train.

  19. Distance Protection of Cross-Bonded Transmission Cable-Systems

    DEFF Research Database (Denmark)

    Bak, Claus Leth; F. Jensen, Christian

    2014-01-01

    In this paper the problems of protecting a cross-bonded cable system using distance protection are analysed. The combination of the desire to expand the high voltage transmission grid and the public's opinion towards new installations of overhead lines (OHL), more and more transmission cable syst...

  20. Centralized Coordination of Load Shedding & Protection System of Transmission Lines

    DEFF Research Database (Denmark)

    Hoseinzadeh, Bakhtyar; Bak, Claus Leth

    2018-01-01

    The power system integrity is vulnerable to thermal limit of transmission lines due to overloading and consequently activation of their protection devices following severe contingencies. In this paper, the loading rate of transmission lines is monitored online and is considered in the centralized......, over current protection....

  1. The automotive transmission book

    CERN Document Server

    Fischer, Robert; Jürgens, Gunter; Najork, Rolf; Pollak, Burkhard

    2015-01-01

    This book presents essential information on systems and interactions in automotive transmission technology and outlines the methodologies used to analyze and develop transmission concepts and designs. Functions of and interactions between components and subassemblies of transmissions are introduced, providing a basis for designing transmission systems and for determining their potentials and properties in vehicle-specific applications: passenger cars, trucks, buses, tractors, and motorcycles. With these fundamentals the presentation provides universal resources for both state-of-the-art and future transmission technologies, including systems for electric and hybrid electric vehicles.

  2. Electrical energy market management in deregulated power system

    International Nuclear Information System (INIS)

    Abady, A. F.; Niknam, T.

    2003-01-01

    For many decades, vertically integrated electric utilities monopolized the way they control, sell and distribute electricity to customers in their service territories. In this monopoly, each utility managed three main components of the system: generation, transmission and distribution. Analogous to perceived competitions in airline, communication and natural gas industries which demonstrated that vertically integrated monopolies could not provide services as efficiently as competitive firms, the electric power industry plans to improve its efficiency by providing a more reliable energy at least cost to customers. A competition is guaranteed by establishing a restructured environment in which customers could choose to buy from different suppliers and change suppliers as they wish in order to pay market base rates. This paper is dealing with progressive approach of restructuring in power and introduce ISO, its functions and model of electrical energy markets

  3. New technologies application to increase the transmission capacity in power systems; Aplicacao de novas tecnologias para aumentar a capacidade de transmissao em sistemas de potencia

    Energy Technology Data Exchange (ETDEWEB)

    Figueiredo, Erli Ferreira [Universidade do Estado, Rio de Janeiro, RJ (Brazil)]. E-mail: erli@openlink.com.br

    2001-07-01

    The deregulation and the Brazilian electric sector new formulation associated to the growth of the electric energy market, has been contributing to increase the power flows through located transmission lines in one same region, as well as in different regions. This increase of flow will require the construction of new transmission lines, in general associated to eventual efforts in the system. However, due to environmental restrictions and to difficulties for acquisition of free soil bands for transmission lines, in this article new technologies of transmission in order to increase the capacity of the existing and future power systems are presented, with the purpose of preventing or postponing the construction of new transmission lines.

  4. Propagation of 1-THz bandwidth electrical pulses on high Tc superconducting transmission lines

    International Nuclear Information System (INIS)

    Nuss, M.C.; Mankiewich, P.M.; Howard, R.E.; Harvey, T.E.; Brandle, C.D.; Straugh, B.L.; Smith, P.R.

    1989-01-01

    The new high temperature superconductors have triggered enormous interest not only because of the unique physics involved but also because of their technical potentials, such as the promise for propagation of extremely short electrical pulses. Superconducting band caps of --20TH z are predicted assuming BCS theory for the superconductor, making lossless propagation of electrical pulses as short as 50 fs possible. Despite microwave measurements at low frequencies of several gigahertz first studies at higher frequencies by Dykaar et al have shown distortion-free propagation of 100-GHz electrical pulses on YBa 2 Cu 3 O 3 (YBCO) lines for --5-mm propagation distance. Results were also reported for aluminum coplanar lines and a YBCO ground plane. The authors report on the propagation of 1-ps electrical pulses (1-THz bandwidth) on YBCO coplanar transmission lines defined on lanthanum gallate (LaGaO 3 ) as a substrate. On LaGaO 3 , YBCO grows highly oriented as on SrTiO 3 . However, unlike SrTiO 3 , LaGaO 3 has a much lower dielectric constant and small losses in the terahertz frequency range. Electrical pulses of --750-fs duration are generated in a radiation-damaged silicon-on-sapphire photoconductive switch integrated into a 20-μm coplanar stripline with 10-μm spacing and excited with 100-fs optical pulses from a CPM laser. An μ1-THz bandwidth electrical contact is made to the YBCO coplanar stripline defined on LaGaO 3 using a flip-chip geometry. They find that electrical pulses broaden only from 750 fs to 1 ps with little loss in amplitude on traveling through their flip-chip input and propagated electrical pulses are probed by electooptic sampling in two small LiTaO 3 crystals separated by 3 mm

  5. INFORMATION-MEASURING TEST SYSTEM OF DIESEL LOCOMOTIVE HYDRAULIC TRANSMISSIONS

    Directory of Open Access Journals (Sweden)

    I. V. Zhukovytskyy

    2015-08-01

    Full Text Available Purpose. The article describes the process of developing the information-measuring test system of diesel locomotives hydraulic transmission, which gives the possibility to obtain baseline data to conduct further studies for the determination of the technical condition of diesel locomotives hydraulic transmission. The improvement of factory technology of post-repair tests of hydraulic transmissions by automating the existing hydraulic transmission test stands according to the specifications of the diesel locomotive repair enterprises was analyzed. It is achieved based on a detailed review of existing foreign information-measuring test systems for hydraulic transmission of diesel locomotives, BelAZ earthmover, aircraft tug, slag car, truck, BelAZ wheel dozer, some brands of tractors, etc. The problem for creation the information-measuring test systems for diesel locomotive hydraulic transmission is being solved, starting in the first place from the possibility of automation of the existing test stand of diesel locomotives hydraulic transmission at Dnipropetrovsk Diesel Locomotive Repair Plant "Promteplovoz". Methodology. In the work the researchers proposed the method to create a microprocessor automated system of diesel locomotives hydraulic transmission stand testing in the locomotive plant conditions. It acts by justifying the selection of the necessary sensors, as well as the application of the necessary hardware and software for information-measuring systems. Findings. Based on the conducted analysis there was grounded the necessity of improvement the plant hydraulic transmission stand testing by creating a microprocessor testing system, supported by the experience of developing such systems abroad. Further research should be aimed to improve the accuracy and frequency of data collection by adopting the more modern and reliable sensors in tandem with the use of filtering software for electromagnetic and other interference. Originality. The

  6. Distributed Electrical Energy Systems: Needs, Concepts, Approaches and Vision

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Yingchen [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Zhang, Jun [University of Denver; Gao, Wenzhong [University of Denver; Zheng, Xinhu [University of Minnesota; Yang, Liuqing [Colorado State University; Hao, Jun [University of Denver; Dai, Xiaoxiao [University of Denver

    2017-09-01

    Intelligent distributed electrical energy systems (IDEES) are featured by vast system components, diversifled component types, and difficulties in operation and management, which results in that the traditional centralized power system management approach no longer flts the operation. Thus, it is believed that the blockchain technology is one of the important feasible technical paths for building future large-scale distributed electrical energy systems. An IDEES is inherently with both social and technical characteristics, as a result, a distributed electrical energy system needs to be divided into multiple layers, and at each layer, a blockchain is utilized to model and manage its logic and physical functionalities. The blockchains at difierent layers coordinate with each other and achieve successful operation of the IDEES. Speciflcally, the multi-layer blockchains, named 'blockchain group', consist of distributed data access and service blockchain, intelligent property management blockchain, power system analysis blockchain, intelligent contract operation blockchain, and intelligent electricity trading blockchain. It is expected that the blockchain group can be self-organized into a complex, autonomous and distributed IDEES. In this complex system, frequent and in-depth interactions and computing will derive intelligence, and it is expected that such intelligence can bring stable, reliable and efficient electrical energy production, transmission and consumption.

  7. Quantifying the daily economic impact of extreme space weather due to failure in electricity transmission infrastructure

    Science.gov (United States)

    Oughton, Edward J.; Skelton, Andrew; Horne, Richard B.; Thomson, Alan W. P.; Gaunt, Charles T.

    2017-01-01

    Extreme space weather due to coronal mass ejections has the potential to cause considerable disruption to the global economy by damaging the transformers required to operate electricity transmission infrastructure. However, expert opinion is split between the potential outcome being one of a temporary regional blackout and of a more prolonged event. The temporary blackout scenario proposed by some is expected to last the length of the disturbance, with normal operations resuming after a couple of days. On the other hand, others have predicted widespread equipment damage with blackout scenarios lasting months. In this paper we explore the potential costs associated with failure in the electricity transmission infrastructure in the U.S. due to extreme space weather, focusing on daily economic loss. This provides insight into the direct and indirect economic consequences of how an extreme space weather event may affect domestic production, as well as other nations, via supply chain linkages. By exploring the sensitivity of the blackout zone, we show that on average the direct economic cost incurred from disruption to electricity represents only 49% of the total potential macroeconomic cost. Therefore, if indirect supply chain costs are not considered when undertaking cost-benefit analysis of space weather forecasting and mitigation investment, the total potential macroeconomic cost is not correctly represented. The paper contributes to our understanding of the economic impact of space weather, as well as making a number of key methodological contributions relevant for future work. Further economic impact assessment of this threat must consider multiday, multiregional events.

  8. One-dimensional pressure transfer models for acoustic-electric transmission channels

    Science.gov (United States)

    Wilt, K. R.; Lawry, T. J.; Scarton, H. A.; Saulnier, G. J.

    2015-09-01

    A method for modeling piezoelectric-based ultrasonic acoustic-electric power and data transmission channels is presented. These channels employ piezoelectric disk transducers to convey signals across a series of physical layers using ultrasonic waves. This model decomposes the mechanical pathway of the signal into individual ultrasonic propagation layers which are generally independent of the layer's adjacent domains. Each layer is represented by a two-by-two traveling pressure wave transfer matrix which relates the forward and reverse pressure waves on one side of the layer to the pressure waves on the opposite face, where each face is assumed to be in contact with a domain of arbitrary reference acoustic impedance. A rigorous implementation of ultrasonic beam spreading is introduced and implemented within applicable domains. Compatible pressure-wave models for piezoelectric transducers are given, which relate the electric voltage and current interface of the transducer to the pressure waves on one mechanical interface while also allowing for passive acoustic loading of the secondary mechanical interface. It is also shown that the piezoelectric model's electrical interface is compatible with transmission line parameters (ABCD-parameters), allowing for connection of electronic components and networks. The model is shown to be capable of reproducing the behavior of realistic physical channels.

  9. Electric and hybrid vehicle system R/D

    Science.gov (United States)

    Schwartz, H. J.

    1980-01-01

    The work being done to characterize the level of current propulsion technology through component testing is described. Important interactions between the battery and the propulsion system will be discussed. Component development work, involving traction motors, motor controllers and transmissions are described and current results are presented. Studies of advanced electric and hybrid propulsion system studies are summarized and the status of propulsion system development work supported by the project is described. A strategy for fostering joint industry/government projects for commercialization of propulsion components and systems is described briefly.

  10. Design of a borehole data-acquisition/transmission system. Final report, Volume I

    International Nuclear Information System (INIS)

    Hancock, R.L.; Bowden, J.C.

    1981-06-01

    Objective of the BDATS program was to design, construct, and demonstrate a borehole probe and associated uphole modules that would allow downhole collection of data from any of several borehole probes and would allow digital transmission of that data uphole to a computer. Specifically, the system was electrically and mechanically configured to interface to six separate borehole probes and a computer in a R and D logging vehicle. However, the system can be used with other types of probes

  11. Wind power plants. Hydraulic transmission with control systems for unrestricted number of revolutions

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, R

    1976-09-01

    Basic ideas are presented for the design of a hydraulic transmission with its control system adapted to an electric generator operated by a wind turbine with unrestricted revolutions. The settlement of the principle is shown by means of commercially available parts. The relations of the installed effect, its cost and the length of operational life are discussed. The control system is directly integrated to the hydraulic circuits.

  12. Study for wireless power transmission of nuclear robot system

    International Nuclear Information System (INIS)

    Kim, Jongseog

    2013-01-01

    Gasoline engine or electric motor is generally used for driving power of working. Gasoline tank is uncomfortable to carry. Battery capacity does not sustain long time working. Frequent moving back of robot to power charger or refueling tank is inconvenient. Long power cable connection occur winding problem if there are complex structures in walking way. We need some solution for continuous supply of robot energy at the free moving condition of robot. 'Wireless power transmission' is one of the solutions. Some experiment result to transmit wireless power to moving robot is described herein. To find possible wireless power transmission method for nuclear robot, wireless power transmission tests were performed. As result of these tests, it was confirmed that wireless power transmission by using dipole and mat type magnetic induction were possible. As result of flying robot experiment, it was realized that development of light weight core for receiver and wave reflection device for high directional transmitter are necessary for practical use of the dipole type wireless power transmission. Small size core and high directional transmitter will be next target. Mat type wireless power transmission is regarded as useful for robot power charging station in the inside containment

  13. Study for wireless power transmission of nuclear robot system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jongseog [Central Research Institute of Korea Hydro and Nuclear Power Co., Daejeon (Korea, Republic of)

    2013-05-15

    Gasoline engine or electric motor is generally used for driving power of working. Gasoline tank is uncomfortable to carry. Battery capacity does not sustain long time working. Frequent moving back of robot to power charger or refueling tank is inconvenient. Long power cable connection occur winding problem if there are complex structures in walking way. We need some solution for continuous supply of robot energy at the free moving condition of robot. 'Wireless power transmission' is one of the solutions. Some experiment result to transmit wireless power to moving robot is described herein. To find possible wireless power transmission method for nuclear robot, wireless power transmission tests were performed. As result of these tests, it was confirmed that wireless power transmission by using dipole and mat type magnetic induction were possible. As result of flying robot experiment, it was realized that development of light weight core for receiver and wave reflection device for high directional transmitter are necessary for practical use of the dipole type wireless power transmission. Small size core and high directional transmitter will be next target. Mat type wireless power transmission is regarded as useful for robot power charging station in the inside containment.

  14. Electricity Transmission, Pipelines, and National Trails. An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, Alaska, and Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Kuiper, James A; Krummel, John R; Hlava, Kevin J; Moore, H Robert; Orr, Andrew B; Schlueter, Scott O; Sullivan, Robert G; Zvolanek, Emily A

    2014-03-25

    As has been noted in many reports and publications, acquiring new or expanded rights-of-way for transmission is a challenging process, because numerous land use and land ownership constraints must be overcome to develop pathways suitable for energy transmission infrastructure. In the eastern U.S., more than twenty federally protected national trails (some of which are thousands of miles long, and cross many states) pose a potential obstacle to the development of new or expanded electricity transmission capacity. However, the scope of this potential problem is not well-documented, and there is no baseline information available that could allow all stakeholders to study routing scenarios that could mitigate impacts on national trails. This report, Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). Argonne was tasked by DOE to analyze the “footprint” of the current network of National Historic and Scenic Trails and the electricity transmission system in the 37 eastern contiguous states, Alaska, and Hawaii; assess the extent to which national trails are affected by electrical transmission; and investigate the extent to which national trails and other sensitive land use types may be affected in the near future by planned transmission lines. Pipelines are secondary to transmission lines for analysis, but are also within the analysis scope in connection with the overall directives of Section 368 of the Energy Policy Act of 2005, and because of the potential for electrical transmission lines being collocated with pipelines. Based on Platts electrical transmission line data, a total of 101 existing intersections with national trails on federal land were found, and 20 proposed intersections. Transmission lines and pipelines are proposed in Alaska; however there are no

  15. PROVIDING QUALITY OF ELECTRIC POWER IN ELECTRIC POWER SYSTEM IN PARALLEL OPERATION WITH WIND TURBINE

    Directory of Open Access Journals (Sweden)

    Yu. A. Rolik

    2016-01-01

    Full Text Available The problem of providing electric power quality in the electric power systems (EPS that are equipped with sufficiently long air or cable transmission lines is under consideration. This problem proved to be of particular relevance to the EPS in which a source of electrical energy is the generator of wind turbines since the wind itself is an instable primary energy source. Determination of the degree of automation of voltage regulation in the EPS is reduced to the choice of methods and means of regulation of power quality parameters. The concept of a voltage loss and the causes of the latter are explained by the simplest power system that is presented by a single-line diagram. It is suggested to regulate voltage by means of changing parameters of the network with the use of the method of reducing loss of line voltage by reducing its reactance. The latter is achieved by longitudinal capacitive compensation of the inductive reactance of the line. The effect is illustrated by vector diagrams of currents and voltages in the equivalent circuits of transmission lines with and without the use of longitudinal capacitive compensation. The analysis of adduced formulas demonstrated that the use of this method of regulation is useful only in the systems of power supply with a relatively low power factor (cosφ < 0.7 to 0.9. This power factor is typical for the situation of inclusion the wind turbine with asynchronous generator in the network since the speed of wind is instable. The voltage regulation fulfilled with the aid of the proposed method will make it possible to provide the required quality of the consumers’ busbars voltage in this situation. In is turn, it will make possible to create the necessary conditions for the economical transmission of electric power with the lowest outlay of reactive power and the lowest outlay of active power losses.

  16. Electric Aircraft Systems Technology Development

    Data.gov (United States)

    National Aeronautics and Space Administration — This project looks at multiple manned/unmanned full-scale/sub-scale flying research prototypes that will lead to the integration of electric propulsion technology on...

  17. Trends in transmission, distribution, and administration costs for U.S. investor-owned electric utilities

    International Nuclear Information System (INIS)

    Fares, Robert L.; King, Carey W.

    2017-01-01

    This paper analyzes the cost of transmission, distribution, and administration for U.S. investor-owned electric utilities. We analyze data reported to the Federal Energy Regulatory Commission (FERC) from 1994 to 2014 using linear regression to understand how the number of customers in a utility's territory, annual peak demand, and annual energy sales affect annual TD&A spending. Then, we use Edison Electric Institute data for 1960 to 1992 to show trends in TD&A spending between 1960 and 2014. We find that the number of customers in a utility's territory is the single best predictor for annual TD&A costs. Between 1994 and 2014, the average cost per customer was $119/Customer-Year for transmission, $291/Customer-Year for distribution, and $333/Customer-Year for utility administration. Total TD&A costs per customer have been approximately $700–$800/Customer-Year since 1960, but the cost per kWh of energy sold was significantly higher in the 1960s because the average customer used less than half as much energy annually versus 2014. Thus, TD&A costs per kWh are likely to increase if kWh energy sales decline in the future unless cost recovery is transitioned to a mechanism not based solely on kWh sales. - Highlights: • U.S. investor-owned electric utility delivery costs from 1960? 2014 are investigated. • Transmission, distribution, and utility administrative costs are analyzed separately. • The number of utility customers is the best predictor for annual delivery costs. • Delivery costs per kWh are likely to increase if kWh sales decrease in the future.

  18. TWRS privatization phase 1 electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    This document includes Conceptual Design Report (CDR) for a new 11 km (7 miles) 230 kV transmission line and a new 40 MVA substation (A6) which will be located east of Grout Facility in 200E Area tank farm. This substation will provide electrical power up to 20 MW each for two private contractor facilities for immobilization and disposal of low activity waste (LAW)

  19. Automated transmission system operation and management : meeting stakeholder information needs

    Energy Technology Data Exchange (ETDEWEB)

    Peelo, D.F.; Toom, P.O. [British Columbia Hydro, Vancouver, BC (Canada)

    1998-12-01

    Information monitoring is considered to be the fundamental basis for moving beyond substation automation and into automated transmission system operation and management. Information monitoring was defined as the acquisition of data and processing the data into decision making. Advances in digital technology and cheaper, more powerful computing capability has made it possible to capture all transmission stakeholder needs in a shared and automated operation and management system. Recognizing that the key to success in the development of transmission systems is automation, BC Hydro has initiated a long-term research and development project to develop the structure and detail of transmission system automation. The involvement of partners, be they utility or equipment suppliers, is essential in order to deal with protocol and similar issues. 3 refs., 1 tab., 3 figs.

  20. Design of wireless data transmission system for spiral CT

    International Nuclear Information System (INIS)

    Wang Jue; Wang Fuquan; Liu Huaili

    2010-01-01

    A new wireless data transmission scheme based on UWB was proposed after studying the structure and character of spiral CT transmission system, the system was designed and validated. Using UWB device as wireless module to realize wireless data transmission. Using FPGA as main controller to meet the requirement of timing control for system module. Using two pieces of SDRAM in pingpang operation to realize large capacity storage mechanism. Using USB 2.0 interface to realize high-speed connection with UWB module. The results show that the transmission speed of the system arrival at 16.87 M bit ps within 3 meters, and the precision is 100%, it can be used for line-array spiral CT. (authors)

  1. 47 CFR 73.875 - Modification of transmission systems.

    Science.gov (United States)

    2010-10-01

    .... (2) Those that would cause the transmission system to exceed the equipment performance measurements... radiofrequency radiation guidelines. In addition, applications solely filed pursuant to paragraphs (c)(1) or (c...

  2. Combination of AC Transmission Expansion Planning and Reactive Power Planning in the restructured power system

    International Nuclear Information System (INIS)

    Hooshmand, Rahmat-Allah; Hemmati, Reza; Parastegari, Moein

    2012-01-01

    Highlights: ► To overcome the disadvantages of DC model in Transmission Expansion Planning, AC model should be used. ► The Transmission Expansion Planning associated with Reactive Power Planning results in fewer new transmission lines. ► Electricity market concepts should be considered in Transmission Expansion Planning problem. ► Reliability aspects should be considered in Transmission Expansion Planning problem. ► Particle Swarm Optimization is a suitable optimization method to solve Transmission Expansion Planning problem. - Abstract: Transmission Expansion Planning (TEP) is an important issue in power system studies. It involves decisions on location and number of new transmission lines. Before deregulation of the power system, the goal of TEP problem was investment cost minimization. But in the restructured power system, nodal prices, congestion management, congestion surplus and so on, have been considered too. In this paper, an AC model of TEP problem (AC-TEP) associated with Reactive Power Planning (RPP) is presented. The goals of the proposed planning problem are to minimize investment cost and maximize social benefit at the same time. In the proposed planning problem, in order to improve the reliability of the system the Expected Energy Not Supplied (EENS) index of the system is limited by a constraint. For this purpose, Monte Carlo simulation method is used to determine the EENS. Particle Swarm Optimization (PSO) method is used to solve the proposed planning problem which is a nonlinear mixed integer optimization problem. Simulation results on Garver and RTS systems verify the effectiveness of the proposed planning problem for reduction of the total investment cost, EENS index and also increasing social welfare of the system.

  3. Impact of electricity market deregulation on information systems

    International Nuclear Information System (INIS)

    Pharabod, E.; Berrier, M.

    2005-01-01

    Electricity market deregulation is based on un-bundling of activities between generation, transmission and distribution. In a very short time, mechanisms were put in place in order to allow the new market participants to buy and sell electricity. The market operation requires to exchange information at various time horizon, from yearly to real time exchanges, between various actors geographically distributed. The recent market opening to professional customers has also increased the amount of data involved. The information system developed by RTE to manage these data is organised around referential data base, internal and external exchange tools. It must be operated respecting confidentiality of commercial data and being non discriminatory with actors. The security of this information system is now a key issue for the electricity market operation. (authors)

  4. Future development of the electricity systems with distributed generation

    Energy Technology Data Exchange (ETDEWEB)

    Bayod-Rujula, Angel A. [Department of Electrical Engineering, Centro Politecnico Superior, University of Zaragoza, C/Maria de Luna, 3, 50018 Zaragoza (Spain)

    2009-03-15

    Electrical power systems have been traditionally designed taking energy from high-voltage levels, and distributing it to lower voltage level networks. There are large generation units connected to transmission networks. But in the future there will be a large number of small generators connected to the distribution networks. Efficient integration of this distributed generation requires network innovations. A development of active distribution network management, from centralised to more distributed system management, is needed. Information, communication, and control infrastructures will be needed with increasing complexity of system management. Some innovative concepts such as microgrids and virtual utilities will be presented. (author)

  5. Considering system non-linearity in transmission pricing

    International Nuclear Information System (INIS)

    Oloomi-Buygi, M.; Salehizadeh, M. Reza

    2008-01-01

    In this paper a new approach for transmission pricing is presented. The contribution of a contract on power flow of a transmission line is used as extent-of-use criterion for transmission pricing. In order to determine the contribution of each contract on power flow of each transmission line, first the contribution of each contract on each voltage angle is determined, which is called voltage angle decomposition. To this end, DC power flow is used to compute a primary solution for voltage angle decomposition. To consider the impacts of system non-linearity on voltage angle decomposition, a method is presented to determine the share of different terms of sine argument in sine value. Then the primary solution is corrected in different iterations of decoupled Newton-Raphson power flow using the presented sharing method. The presented approach is applied to a 4-bus test system and IEEE 30-bus test system and the results are analyzed. (author)

  6. Cost estimation of HVDC transmission system of Bangka's NPP candidates

    Science.gov (United States)

    Liun, Edwaren; Suparman

    2014-09-01

    Regarding nuclear power plant development in Bangka Island, it can be estimated that produced power will be oversupply for the Bangka Island and needs to transmit to Sumatra or Java Island. The distance between the regions or islands causing considerable loss of power in transmission by alternating current, and a wide range of technical and economical issues. The objective of this paper addresses to economics analysis of direct current transmission system to overcome those technical problem. Direct current transmission has a stable characteristic, so that the power delivery from Bangka to Sumatra or Java in a large scale efficiently and reliably can be done. HVDC system costs depend on the power capacity applied to the system and length of the transmission line in addition to other variables that may be different.

  7. Single-Wire Electric-Field Coupling Power Transmission Using Nonlinear Parity-Time-Symmetric Model with Coupled-Mode Theory

    Directory of Open Access Journals (Sweden)

    Xujian Shu

    2018-03-01

    Full Text Available The output power and transmission efficiency of the traditional single-wire electric-field coupling power transmission (ECPT system will drop sharply with the increase of the distance between transmitter and receiver, thus, in order to solve the above problem, in this paper, a new nonlinear parity-time (PT-symmetric model for single-wire ECPT system based on coupled-mode theory (CMT is proposed. The proposed model for single-wire ECPT system not only achieves constant output power but also obtains a high constant transmission efficiency against variable distance, and the steady-state characteristics of the single-wire ECPT system are analyzed. Based on the theoretical analysis and circuit simulation, it shows that the transmission efficiency with constant output power remains 60% over a transmission distance of approximately 34 m without the need for any tuning. Furthermore, the application of a nonlinear PT-symmetric circuit based on CMT enables robust electric power transfer to moving devices or vehicles.

  8. Electric markets and services of the system

    International Nuclear Information System (INIS)

    Carbajo, A.

    2007-01-01

    Electricity cannot be stored in significant quantities and requires generation and demand be balanced instantly in order to control the frequency. This means that the electric system must be equipped with specific devices in order to ensure this dynamic balance. Of the services required by the electric system, some are mandatory for the generators, while others are voluntary, these last ones being those supplied under market schemes. On the other hand, the commitment of the Spanish electric system to incorporate a significant volume of renewable energy, due to its intermittent properties, demands that these adjustment services use a greater volume of this energy in order to ensure the reliability of the system at all times. Finally, securing the Iberian electric market implies that there might be variations in these services - not only in the volume but also in their characteristics. (Author)

  9. Air quality and climate benefits of long-distance electricity transmission in China

    Science.gov (United States)

    Peng, Wei; Yuan, Jiahai; Zhao, Yu; Lin, Meiyun; Zhang, Qiang; Victor, David G.; Mauzerall, Denise L.

    2017-06-01

    China is the world’s top carbon emitter and suffers from severe air pollution. It has recently made commitments to improve air quality and to peak its CO2 emissions by 2030. We examine one strategy that can potentially address both issues—utilizing long-distance electricity transmission to bring renewable power to the polluted eastern provinces. Based on an integrated assessment using state-of-the-science atmospheric modeling and recent epidemiological evidence, we find that transmitting a hybrid of renewable (60%) and coal power (40%) (Hybrid-by-wire) reduces 16% more national air-pollution-associated deaths and decreases three times more carbon emissions than transmitting only coal-based electricity. Moreover, although we find that transmitting coal power (Coal-by-Wire, CbW) is slightly more effective at reducing air pollution impacts than replacing old coal power plants with newer cleaner ones in the east (Coal-by-Rail, CbR) (CbW achieves a 6% greater reduction in national total air-pollution-related mortalities than CbR), both coal scenarios have approximately the same carbon emissions. We thus demonstrate that coordinating transmission planning with renewable energy deployment is critical to maximize both local air quality benefits and global climate benefits.

  10. Analytical modeling of a sandwiched plate piezoelectric transformer-based acoustic-electric transmission channel.

    Science.gov (United States)

    Lawry, Tristan J; Wilt, Kyle R; Scarton, Henry A; Saulnier, Gary J

    2012-11-01

    The linear propagation of electromagnetic and dilatational waves through a sandwiched plate piezoelectric transformer (SPPT)-based acoustic-electric transmission channel is modeled using the transfer matrix method with mixed-domain two-port ABCD parameters. This SPPT structure is of great interest because it has been explored in recent years as a mechanism for wireless transmission of electrical signals through solid metallic barriers using ultrasound. The model we present is developed to allow for accurate channel performance prediction while greatly reducing the computational complexity associated with 2- and 3-dimensional finite element analysis. As a result, the model primarily considers 1-dimensional wave propagation; however, approximate solutions for higher-dimensional phenomena (e.g., diffraction in the SPPT's metallic core layer) are also incorporated. The model is then assessed by comparing it to the measured wideband frequency response of a physical SPPT-based channel from our previous work. Very strong agreement between the modeled and measured data is observed, confirming the accuracy and utility of the presented model.

  11. [Study on a wireless energy transmission system for the noninvasive examination micro system inside alimentary tracts].

    Science.gov (United States)

    He, Xiu; Yan, Guo-Zheng; Wang, Fu-Min

    2008-01-01

    A wireless energy transmission system for the MEMS system inside alimentary tracts is reported here in the paper. It consists of an automatic frequency tracking circuit of phase lock loop and phase shift PWM control circuit. Experimental results show that the energy transmission system is capable of automatic frequency-tracking and transmission power-adjusting and has stable received energy.

  12. A framework for cost-based pricing of transmission and ancillary services in competitive electric power markets

    International Nuclear Information System (INIS)

    Zobian, A.; Ilic, M.D.

    1995-01-01

    In this paper the authors propose a framework for accurate cost determination and pricing of transmission and ancillary services in competitive electric power markets. The proposed framework is based on their anticipation of the evolving environment and industry structure. They envision the future as a competitive energy market with a centralized control entity that coordinates system activities, prices transmission and ancillary services and controls various system resources. This control entity has control over a certain (pre-defined) geographical area. It is proposed that the system operation and control be kept as they are currently done in control centers, no major change in these functions is required for the proposed pricing strategy. The pricing strategy is divided into two main classes based on time scale separation and firmness, short and long term, firm and interruptible contracts. The approach is based on superposition of different transaction on the network, and a three-part tariff design. The charges are directly related to the impact of each transaction on the system

  13. Evaluating the potential impact of transmission constraints on the operation of a competitive electricity market in Illinois.

    Energy Technology Data Exchange (ETDEWEB)

    Cirillo, R.; Thimmapuram, P.; Veselka, T.; Koritarov, V.; Conzelmann, G.; Macal, C.; Boyd, G.; North, M.; Overbye, T.; Cheng, X.; Decision and Information Sciences; Univ. of Illinois

    2006-04-30

    Despite the current adequacy of the generation and transmission system in Illinois, there is concern that the uncertainties of electricity restructuring warrant a more detailed analysis to determine if there might be pitfalls that have not been identified under current conditions. The problems experienced elsewhere in the country emphasize the need for an evaluation of how Illinois might fare under a restructured electricity market. The Illinois Commerce Commission (ICC) commissioned this study to be undertaken as a joint effort by the University of Illinois at Urbana-Champaign and Argonne National Laboratory to evaluate the Illinois situation in the 2007 period when restructuring is scheduled to be fully implemented in the State. The purpose of this study is to make an initial determination if the transmission system in Illinois and the surrounding region would be able to support a competitive electricity market, would allow for effective competition to keep prices in check, and would allow for new market participants to effectively compete for market share. The study seeks to identify conditions that could reasonably be expected to occur that would enable a company to exercise market power in one or more portions of the State and thereby create undue pressure on the prices charged to customers and/or inhibit new market participants from entering the market. The term 'market power' has many different definitions, and there is no universal agreement on how to measure it. For the purposes of this study, the term is defined as the ability to raise prices and increase profitability by unilateral action. A more complete definition is provided later. With this definition, the central question of this analysis becomes: 'Can a company, acting on its own, raise electricity prices and increase its profits?' It should be noted that the intent of the study is not to predict whether or not such market power would be exercised by any company. Rather, it is

  14. Rural Electricity and Isolated Systems

    International Nuclear Information System (INIS)

    Ruiz, Otto; Solorzano, Benjamin

    2000-01-01

    The paper describes the impact of the cost of investment, operation and trading of rural electricity and discuss cost-benefit analysis. This evaluation covers a three different periods: before 1990, the period 1990-1996 and 1997-1999. Also the trends of demand and supply of energy are presented

  15. Economic comparison of HVDC transmission and coal transport for Kalimantan - Sulawesi power system expansion

    International Nuclear Information System (INIS)

    Edwaren Liun

    2016-01-01

    Due to the load characteristics on many regions in Indonesia, the electrical system is often inefficient. In areas far from an interconnected network, for example isolated island, the choice of low cost fueled plants such as coal can not be applied, while the oil fueled has a very high generation cost and high burdened on subsidies. As a result, those area are still use oil fueled plant by limiting the generator flame time and consumers do not receive satisfactory service. This paper aims to analyze the extent to which the benefit of HVDC transmission system from Kalimantan to Sulawesi so that consumers could get better services and able to produce in order to improve their welfare. The method used in this analysis is a literature study and perform calculations based on existing formula. The result shows that in term of direct cost, HVDC system which covers transmission line, converter and loses cost, yield in a range of 0.46 - 0.60 USD¢/kWh for the capacity within 500 - 2000 Mwe. While coal transportation cost is in the range of 0.544 - 0.645 USD¢/kWh for long barge between 270 - 300 feet. Therefore, for the region of Indonesia which consist lots of islands and remote areas, power supply using HVDC transmission from area with more evolved electrical system could enable more economical, so that remote region also got excellent electrical services to improve the well-being and incomes of the population. (author)

  16. Some problems relating to the transmission of electrical power at very high voltage

    Energy Technology Data Exchange (ETDEWEB)

    Goldstein, A

    1965-01-01

    Some of the technical and economic factors which influence the choice of a transmission system, particularly a very high voltage one, are discussed. The stability of transmission overvoltages at mains frequency and their control by means of compensating reactances is described. Overvoltages due to circuit-breaker operation and those of atmospheric origin, and appropriate protective devices, the behaviour of equipment at 750 kV, and problems of testing are included. Finally, the 735 kV network now being installed to carry 5300 MW of hydroelectric power 650 km from the Manicouagan River to Quebec and Montreal is described.

  17. European standards applied by Gas Transmission System Operator

    International Nuclear Information System (INIS)

    Witek, M.; Kuchta, K.; Oleszkiewicz, J.; Teperek, T.

    2005-01-01

    The lecture described actual state of implementation of European standards concerning transmission of natural gas and underlined their importance for proper performance of Transmission System Operator (TSO). European standards implemented to Polish Standards as PN-EN, necessary for TSO, related to design, construction and operation of high pressure gas network were also described. The lecture underlined as well the impact of standards application on preparation process of national regulations. They obligate TSO to create the technical conditions that ensure safety of gas transmission network functioning as well as environmental and surroundings safety. (authors)

  18. Effects of long-term contracts on firms exercising market power in transmission constrained electricity markets

    International Nuclear Information System (INIS)

    Nam, Young Woo; Yoon, Yong Tae; Park, Jong-Keun; Hur, Don; Kim, Sung-Soo

    2006-01-01

    The electricity markets with only few large firms are often vulnerable to less competitive behaviors than the desired. The presence of transmission constraints further restrict the competition among firms and provide more opportunities for firms to exercise market power. While it is generally acknowledged that the long-term contracts provide good measures for mitigating market power in the spot market (thus reducing undesired price spikes), it is not even more clear how effective these contracts are if the market is severely limited due to transmission constraints. In this paper, an analytical approach through finding a Nash equilibrium is presented to investigate the effects of long-term contracts on firms exercising market power in a bid-based pool with transmission constraints. Surprisingly the analysis in this paper shows that the presence of long-term contracts may result in the reduced expected social welfare. A straightforward consequence of the analysis presented in this paper will be helpful for the regulators in Korea to reconsider offering vesting contracts to generating companies in the near future. (author)

  19. The spanish electric system operation. The contribution of nuclear generation

    International Nuclear Information System (INIS)

    Duvison, M. R.; Torre, M. de la

    2009-01-01

    Operation of an electric system encloses the collection of activities which extend from affective generation dispatch to issuing instruction for network manoeuvring along with international exchange scheduling. Based on the market mechanisms that apply to energy transactions, these tasks guarantee the security of supply end consumers, which is the final goal of the System Operators actions. In Spain this function is executed by Red Electrica de Espana (REE) since 1985, after being constituted as the first Transmission and System Operator (TSO) in the world. Additionally the variations to Law 54/1997 introduced by law 17/2007 also assign REE the function of sole transmission owner in the Spanish electric system. In order to achieve the aforementioned goal, nuclear energy plays in Spain a fundamental role in electric generation thanks to its high availability rate, the predictability of its fuel recharges, its high operational reliability, its geographical location, the stability of its costs and the security of supply given by the possibility of on-site fuel storage in the power plant. (Author)

  20. Transmission Lines or Poles, Electric, Electric transmission lines locations provided to us from Kansas City Power and Light and City of Gardner only at this time. AIMS is working on getting other providers in area. Data is limited to CUE (Collaborative Utility Exchange) Participants and subc, Published in 2004, Johnson County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Transmission Lines or Poles, Electric dataset current as of 2004. Electric transmission lines locations provided to us from Kansas City Power and Light and City of...

  1. Design and Analysis of Hydrostatic Transmission System

    Science.gov (United States)

    Mistry, Kayzad A.; Patel, Bhaumikkumar A.; Patel, Dhruvin J.; Parsana, Parth M.; Patel, Jitendra P.

    2018-02-01

    This study develops a hydraulic circuit to drive a conveying system dealing with heavy and delicate loads. Various safety circuits have been added in order to ensure stable working at high pressure and precise controlling. Here we have shown the calculation procedure based on an arbitrarily selected load. Also the circuit design and calculations of various components used is depicted along with the system simulation. The results show that the system is stable and efficient enough to transmit heavy loads by functioning of the circuit. By this information, one can be able to design their own hydrostatic circuits for various heavy loading conditions.

  2. Non-contact magnetic coupled power and data transferring system for an electric vehicle

    International Nuclear Information System (INIS)

    Matsuda, Y.; Sakamoto, H.

    2007-01-01

    We have developed a system which transmits electric power and communication data simultaneously in a non-contact method using a magnetic coupling coil. Already, we are developing the fundamental technology of a non-contact charging system, and this is applied in electric shavers, electric toothbrushes, etc. Moreover, basic experiments are being conducted for applying this non-contact charging system to electric equipments such as an electric vehicle (EV), which is a zero emission vehicle and environmentally excellent and will be the transportation means of the next generation. The technology can also be applied in other electronic equipment, etc. However, since the power supply route for these individual devices is independent, the supply system is complicated. EV also has to perform the transmission of electric power and the transmission of information (data), such as the amount of the charge, in a separate system, and thus is quite complicated. In this study, by performing simultaneously the transmission of electric power and information (data) using magnetic coupling technology in which it does not contact, the basic experiment aimed at attaining and making unification of a system simple was conducted, and the following good results were obtained: (1) Electric power required for load can be transmitted easily by non-contact. (2) A signal can easily be transmitted bidirectionally by non-contact. (3) This system is reliable, and is widely applicable

  3. Solar electric power generation photovoltaic energy systems

    CERN Document Server

    Krauter, Stefan CW

    2007-01-01

    Solar electricity is a viable, environmentally sustainable alternative to the world's energy supplies. In support, this work examines the various technical parameters of photovoltaic systems. It analyzes the study of performance and yield (including optical, thermal, and electrical parameters and interfaces).

  4. 49 CFR 238.425 - Electrical system.

    Science.gov (United States)

    2010-10-01

    ... protected with a lightning arrestor, automatic circuit breaker, and overload relay. The lightning arrestor... the operating environment. (2) The electronic equipment shall not produce electrical noise that...) Electrical and electronic systems of equipment shall be capable of operation in the presence of external...

  5. Life Cycle Assessment on a 765 kV Venezuelan Transmission System

    International Nuclear Information System (INIS)

    Wang, Wenlu; Tremouille, Gilles; Beroual, Abderrahmane; Bessede, Jean-Luc

    2011-03-01

    The demand to preserve the environment and form a sustainable development is greatly increasing in the recent decades all over the world, and this environmental concern is also merged in electrical power industry, resulting in many eco-design approaches in T and D industries. As a method of eco-design, Life Cycle Assessment (LCA) is a systematic tool that enables the assessment of the environmental impacts of a product or service throughout its entire life cycle, i.e. raw material production, manufacture, distribution, use and disposal including all intervening transportation steps necessary or caused by the product's existence. In T and D industries, LCA has been done for a lot of products individually, in order to see one product's environmental impacts and to seek for ways of improving its environmental performance. This eco-design for product approach is a rather well-developed trend, however, as only a single electrical product cannot provide the electrical power to users, electrical system consists of a huge number of components, in order to investigate system's environmental profile, the entire environmental profiles of different composing products has to be integrated systematically, that is to say, a system approach is needed. Under this philosophy, in this paper, an LCA using SimaPro (one kind of LCA software) is conducted on a whole Venezuelan 765 kV AC transmission system, which transmits 8000 MW hydro-electrical power through 760 km to this country's load centers, with total 7 substations, i.e. one sending end, 2 intermediate substations and 4 receiving ends. This LCA includes both transmission lines and substations, and then the environmental impacts of the whole transmission system are investigated. (authors)

  6. Pragmatic electrical engineering systems and instruments

    CERN Document Server

    Eccles, William

    2011-01-01

    Pragmatic Electrical Engineering: Systems and Instruments is about some of the non-energy parts of electrical systems, the parts that control things and measure physical parameters. The primary topics are control systems and their characterization, instrumentation, signals, and electromagnetic compatibility. This text features a large number of completely worked examples to aid the reader in understanding how the various principles fit together.While electric engineers may find this material useful as a review, engineers in other fields can use this short lecture text as a modest introduction

  7. Bus bar electrical feedthrough for electrorefiner system

    Science.gov (United States)

    Williamson, Mark; Wiedmeyer, Stanley G; Willit, James L; Barnes, Laurel A; Blaskovitz, Robert J

    2013-12-03

    A bus bar electrical feedthrough for an electrorefiner system may include a retaining plate, electrical isolator, and/or contact block. The retaining plate may include a central opening. The electrical isolator may include a top portion, a base portion, and a slot extending through the top and base portions. The top portion of the electrical isolator may be configured to extend through the central opening of the retaining plate. The contact block may include an upper section, a lower section, and a ridge separating the upper and lower sections. The upper section of the contact block may be configured to extend through the slot of the electrical isolator and the central opening of the retaining plate. Accordingly, relatively high electrical currents may be transferred into a glovebox or hot-cell facility at a relatively low cost and higher amperage capacity without sacrificing atmosphere integrity.

  8. Management of the Spanish Electric System

    International Nuclear Information System (INIS)

    Casajus, V.

    2004-01-01

    After expressing his thanks for being invited to the meeting, Victoriano Casajus said that the hoped he would not be invited again because that would mean there had been another zero, even though it didn't happen in Spain. Casajus also congratulated the Spanish nuclear power plants for their excellent operation. Before beginning his presentation, the director claimed that all of us who are involved in the Spanish electric system can be proud of having a system that is possible one of the best in the world, because it has an excellent generation mix, a tremendously balanced transmission grid and a regulatory system that, although it has its faults, is very capable of responding to society's demands. In his presentation, Casajus took stock of the growing demand for energy and power and provided data that show that the Spanish system has experienced a 43% increase in electric energy demand between 1996 and 2003. The problem is with peak demand. It is paradoxical that, in 1998, reaching 34,000 MW was a dream and now going below that figure is almost impossible. Growth of peak demand during those years was 46%. The Spanish fleet was developed in the 70s for three fundamental reasons: phase-out of liquid fuels, massive inroad of coal, and significant expansion of Spanish nuclear power. Starting in the 90s, construction of generating plants practically came to a standstill, although with the excess installed power and more or less new plants (almost all of them were less than 20 years old) it was possible to maintain 48% growth in demand. However, the coverage rate dropped from a value of 1,45 in 1996 to barely 1.10 in2001 and to 1.05 in 2002. in spite of the inclusion of the so-called renewable or special energies. The problem is that not all sources of energy provide the same coverage, and unmanageable energies cannot be considered for managing a system, added Casajus. The general director of Red Electrica noted that Spain has had problems associated with energy

  9. Optimal control applications in electric power systems

    CERN Document Server

    Christensen, G S; Soliman, S A

    1987-01-01

    Significant advances in the field of optimal control have been made over the past few decades. These advances have been well documented in numerous fine publications, and have motivated a number of innovations in electric power system engineering, but they have not yet been collected in book form. Our purpose in writing this book is to provide a description of some of the applications of optimal control techniques to practical power system problems. The book is designed for advanced undergraduate courses in electric power systems, as well as graduate courses in electrical engineering, applied mathematics, and industrial engineering. It is also intended as a self-study aid for practicing personnel involved in the planning and operation of electric power systems for utilities, manufacturers, and consulting and government regulatory agencies. The book consists of seven chapters. It begins with an introductory chapter that briefly reviews the history of optimal control and its power system applications and also p...

  10. Challenges to China's transition to a low carbon electricity system

    International Nuclear Information System (INIS)

    Kahrl, Fredrich; Williams, Jim; Ding Jianhua; Hu Junfeng

    2011-01-01

    We examine the challenges to China's transition to a low carbon electricity system, in which renewable energy would play a significant role. China's electricity system currently lacks the flexibility in planning, operations, and pricing to respond to conflicting pressures from demand growth, rising costs, and environmental mandates in a way that simultaneously maintains reliability, decarbonizes the system, and keeps prices within acceptable bounds. Greater flexibility crucially requires the ability to more systematically and transparently manage and allocate costs. This will require re-orientating sector institutions still rooted in central planning, and strengthening independent regulation. Some of the necessary changes require fundamental political and legal reforms beyond the scope of energy policy. However, the system's flexibility can still be increased through the development of traditional planning and regulatory tools and approaches, such as an avoided cost basis for energy efficiency investments, more integrated planning to improve the coordination of generation, transmission, and demand-side investments, and a transparent ratemaking process. The judicious application of OECD electricity sector experience and skills can support these developments. - Research highlights: → China's electricity system currently lacks the flexibility to integrate renewables and reduce CO 2 emissions on a large scale at an acceptable cost and level of reliability. → The challenges to increased flexibility are more institutional than technological. → Chinese government agencies need new approaches to basic power system planning and ratemaking. → OECD countries can help address these challenges through the transfer of 'soft' technologies.

  11. Expansion of the high-voltage direct current transmission systems; Netzausbau mit Hochspannungs-Gleichstrom-Uebertragung

    Energy Technology Data Exchange (ETDEWEB)

    Spahic, Ervin; Benz, Thomas; Goerner, Raphael; Sass, Florian [ABB AG, Mannheim (Germany)

    2012-12-15

    In September 2010 the German federal government announced its energy concept for an environmentally friendly, reliable and affordable energy supply. This concept describes a ''path into the era of renewable energy'' up to the year 2050, with electricity production from photovoltaics and wind power taking centre stage. Since the expansion of renewable energy production is mainly taking place in the North (wind power) and the South (PV), this poses a great challenge to the electricity networks. It necessitates the expansion of power transmission systems, notably for transporting electricity generated by wind power in the North to the consumer centres in Western and Southern Germany. However, progress to this end has been very slow. For this reason a technical question now presents itself, namely whether high-voltage direct current technology could possibly offer a solution to the electricity transport problems associated with the energy turnaround.

  12. Electrical system studies for the grid connection of wind farms

    International Nuclear Information System (INIS)

    Arp, K.; Hanson, J.; Hopp, S.; Zimmermann, W.

    2007-01-01

    Wind power is gaining momentum in the world's energy balance. Several issues have to be addressed whenever power-generating devices are connected to the grid. The paper describes studies needed to evaluate the influence of wind farms on the connected transmission system and how faults in the system impact on induction generators in a wind farm. Some generalized results of studies for an offshore wind farm in the North Sea and a Bulgarian wind farm show how studies can influence the layout of the internal network and the electrical equipment. (authors)

  13. Space Weather Effects on Current and Future Electric Power Systems

    Science.gov (United States)

    Munoz, D.; Dutta, O.; Tandoi, C.; Brandauer, W.; Mohamed, A.; Damas, M. C.

    2016-12-01

    This work addresses the effects of Geomagnetic Disturbances (GMDs) on the present bulk power system as well as the future smart grid, and discusses the mitigation of these geomagnetic impacts, so as to reduce the vulnerabilities of the electric power network to large space weather events. Solar storm characterized by electromagnetic radiation generates geo-electric fields that result in the flow of Geomagnetically Induced Currents (GICs) through the transmission lines, followed by transformers and the ground. As the ground conductivity and the power network topology significantly vary with the region, it becomes imperative to estimate of the magnitude of GICs for different places. In this paper, the magnitude of GIC has been calculated for New York State (NYS) with the help of extensive modelling of the whole NYS electricity transmission network using real data. Although GIC affects only high voltage levels, e.g. above 300 kV, the presence of coastline in NYS makes the low voltage transmission lines also susceptible to GIC. Besides this, the encroachment of technologies pertaining to smart grid implementation, such as Phasor Measurement Units (PMUs), Microgrids, Flexible AC Transmission System (FACTS), and Information and Communication Technology (ICT) have been analyzed for GMD impacts. Inaccurate PMU results due to scintillation of GPS signals that are affected by electromagnetic interference of solar storm, presence of renewable energy resources in coastal areas that are more vulnerable to GMD, the ability of FACTS devices to either block or pave new path for GICs and so on, shed some light on impacts of GMD on smart grid technologies.

  14. Linearization Technologies for Broadband Radio-Over-Fiber Transmission Systems

    Directory of Open Access Journals (Sweden)

    Xiupu Zhang

    2014-11-01

    Full Text Available Linearization technologies that can be used for linearizing RoF transmission are reviewed. Three main linearization methods, i.e. electrical analog linearization, optical linearization, and electrical digital linearization are presented and compared. Analog linearization can be achieved using analog predistortion circuits, and can be used for suppression of odd order nonlinear distortion components, such as third and fifth order. Optical linearization includes mixed-polarization, dual-wavelength, optical channelization and the others, implemented in optical domain, to suppress both even and odd order nonlinear distortion components, such as second and third order. Digital predistortion has been a widely used linearization method for RF power amplifiers. However, digital linearization that requires analog to digital converter is severely limited to hundreds of MHz bandwidth. Instead, analog and optical linearization provide broadband linearization with up to tens of GHz. Therefore, for broadband radio over fiber transmission that can be used for future broadband cloud radio access networks, analog and optical linearization are more appropriate than digital linearization. Generally speaking, both analog and optical linearization are able to improve spur-free dynamic range greater than 10 dB over tens of GHz. In order for current digital linearization to be used for broadband radio over fiber transmission, the reduced linearization complexity and increased linearization bandwidth are required. Moreover, some digital linearization methods in which the complexity can be reduced, such as Hammerstein type, may be more promising and require further investigation.

  15. Flexible AC transmission systems. Modelling and control

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Xiao-Ping [Birmingham Univ. (United Kingdom); Rehtanz, Christian [Technische Univ. Dortmund (Germany); Pal, Bikash [Imperial College, London (United Kingdom)

    2012-11-01

    This monograph presents advanced modelling, analysis and control techniques of FACTS. These topics reflect the recent research and development of FACTS controllers, and anticipate the future applications of FACTS in power systems. The book covers comprehensively a range of power-system control problems: from steady-state voltage and power flow control, to voltage and reactive power control, to voltage stability control, to small signal stability control using FACTS controllers. The book presents the modelling of the latest FACTS controllers for power flow control, compensation and power quality (IPFC, GUPF, VSC HVDC and M-VSCHVDC, etc.) in power system analysis. The selection is evaluated by the actual and likely future practical relevance of each. The material is derived mainly from the research and industrial development in which the authors have been heavily involved. The book is timely and of great value to power engineering engineers and students of modelling, simulations and control design of FACTS for a broad practical range of power system operation, planning and control problems.

  16. Transmission congestion and voltage profile management coordination in competitive electricity markets

    International Nuclear Information System (INIS)

    Yamin, H.Y.; Shahidehpour, S.M.

    2003-01-01

    This paper describes a generalized active/reactive iterative coordination process between GENCOs and the Independent System Operator (ISO) for active (transmission congestion) and reactive (voltage profile) management in the day-ahead market. GENCOs apply priced-based unit commitment without transmission and voltage security constraints, schedule their units and submit their initial bids to the ISO. The ISO executes congestion and voltage profile management for eliminating transmission and voltage profile violations. If violations are not eliminated, the ISO minimizes the transmission and voltage profile violations and sends a signal via the Internet to GENCOs. GENCOs reschedule their units taking into account the ISO signals and submit modified bids to the ISO. The voltage problem is addressed and a linear model is formulated and used in the proposed method. The voltage problem is formulated as a linear programming with a block-angular structure and Dantzig-Wolfe decomposition is applied to generate several smaller problems for a faster and easier solution of large-scale power systems. Two 36 unit GENCOs are used to demonstrate the performance of the proposed generalized active/reactive coordination algorithm. (author)

  17. Data transmission system with encryption by chaotic sequences

    Directory of Open Access Journals (Sweden)

    Politans’kyy R. L.

    2014-06-01

    Full Text Available Protection of transferable information in the telecommunication systems is possible by its imposition of coding sequence on a plaintext. Encryption of pseudorandom sequences can be performed by using generation algorithms which are implemented on the basis of the phenomenon of dynamical chaos, which is sensitive to changes in the initial conditions. One of the major problems encountered in the construction of secure communication systems is to provide synchronization between the receiving and transmitting parties of communication systems. Improvement of methods of hidden data transfer based on the systems with chaotic synchronization is the important task of research in the field of information and telecommunication systems based on chaos. This article shows an implementation of a data transmission system, encrypted by sequences, generated on the basis of one-dimensional discrete chaotic maps with ensuring synchronization of the transmitting and receiving sides of the system. In this system realization of synchronization is offered by a transmission through certain time domains of current value of xn generated by a logistic reflection. Xn transmission period depends on computer speed and distance between subscribers of the system. Its value is determined by transmitting a test message before the session. Infallible reception of test message indicates the optimal choice of a transmission period of the current value of xn. Selection period is done at the program level. For the construction of communication network modern software was used, in particular programming language Delphi 7.0. The work of the system is shown on the example of information transmission between the users of the system. The system operates in real time full duplex mode at any hardware implementation of Internet access. It is enough for the users of the system to specify IP address only.

  18. Survey of aircraft electrical power systems

    Science.gov (United States)

    Lee, C. H.; Brandner, J. J.

    1972-01-01

    Areas investigated include: (1) load analysis; (2) power distribution, conversion techniques and generation; (3) design criteria and performance capabilities of hydraulic and pneumatic systems; (4) system control and protection methods; (5) component and heat transfer systems cooling; and (6) electrical system reliability.

  19. Characterization of a 300-GHz Transmission System for Digital Communications

    Science.gov (United States)

    Hudlička, Martin; Salhi, Mohammed; Kleine-Ostmann, Thomas; Schrader, Thorsten

    2017-08-01

    The paper presents the characterization of a 300-GHz transmission system for modern digital communications. The quality of the modulated signal at the output of the system (error vector magnitude, EVM) is measured using a vector signal analyzer. A method using a digital real-time oscilloscope and consecutive mathematical processing in a computer is shown for analysis of signals with bandwidths exceeding that of state-of-the-art vector signal analyzers. The uncertainty of EVM measured using the real-time oscilloscope is open to analysis. Behaviour of the 300-GHz transmission system is studied with respect to various modulation schemes and different signal symbol rates.

  20. Transmission computed tomography data acquisition with a SPECT system

    International Nuclear Information System (INIS)

    Greer, K.L.; Harris, C.C.; Jaszczak, R.J.; Coleman, R.E.; Hedlund, L.W.; Floyd, C.E.; Manglos, S.H.

    1987-01-01

    Phantom and animal transmission computed tomography (TCT) scans were performed with a camera-based single photon emission computed tomography (SPECT) system to determine system linearity as a function of object density, which is important in the accurate determination of attenuation coefficients for SPECT attenuation compensation. Results from phantoms showed promise in providing a linear relationship in measuring density while maintaining good image resolution. Animal images were essentially free of artifacts. Transmission computed tomography scans derived from a SPECT system appear to have the potential to provide data suitable for incorporation in an attenuation compensation algorithm at relatively low (calculated) radiation doses to the subjects

  1. FPGA Implementation of Video Transmission System Based on LTE

    Directory of Open Access Journals (Sweden)

    Lu Yan

    2015-01-01

    Full Text Available In order to support high-definition video transmission, an implementation of video transmission system based on Long Term Evolution is designed. This system is developed on Xilinx Virtex-6 FPGA ML605 Evaluation Board. The paper elaborates the features of baseband link designed in Xilinx ISE and protocol stack designed in Xilinx SDK, and introduces the process of setting up hardware and software platform in Xilinx XPS. According to test, this system consumes less hardware resource and is able to transmit bidirectional video clearly and stably.

  2. Natural Characteristics of The Herringbone Gear Transmission System

    Science.gov (United States)

    Zhou, Jianxing; Sun, Wenlei; Cao, Li

    2018-03-01

    According to the structure characteristics of herringbone gear transmission, a more realistic dynamic model of the transmission system is built in consideration of the inner excitation, herringbone gears axial positioning and sliding bearing etc. The natural frequencies of the system are calculated, and the vibration mode is divided into symmetric vibration modes and asymmetric vibration modes. The time history of system dynamic force is obtained by solving the dynamic model. The effects of the connection stiffness of left and right sides of herringbone gears and axial support stiffness on natural characteristics are discussed.

  3. Subcarrier multiplexing tolerant dispersion transmission system employing optical broadband sources.

    Science.gov (United States)

    Grassi, Fulvio; Mora, José; Ortega, Beatriz; Capmany, José

    2009-03-16

    This paper presents a novel SCM optical transmission system for next-generation WDM-PONs combining broadband optical sources and a Mach-Zehnder interferometric structure. The approach leeds to transport RF signals up to 50 GHz being compatible with RoF systems since a second configuration has been proposed in order to overcome dispersion carrier suppression effect using DSB modulation. The theoretical analysis validates the potentiality of the system also considering the effects of the dispersion slope over the transmission window. (c) 2009 Optical Society of America

  4. Proceedings: Power Plant Electric Auxiliary Systems Workshop

    International Nuclear Information System (INIS)

    1992-06-01

    The EPRI Power Plant Electric Auxiliary Systems Workshop, held April 24--25, 1991, in Princeton, New Jersey, brought together utilities, architect/engineers, and equipment suppliers to discuss common problems with power plant auxiliary systems. Workshop participants presented papers on monitoring, identifying, and solving problems with auxiliary systems. Panel discussions focused on improving systems and existing and future plants. The solutions presented to common auxiliary system problems focused on practical ideas that can enhance plant availability, reduce maintenance costs, and simplify the engineering process. The 13 papers in these proceedings include: Tutorials on auxiliary electrical systems and motors; descriptions of evaluations, software development, and new technologies used recently by electric utilities; an analysis of historical performance losses caused by power plant auxiliary systems; innovative design concepts for improving auxiliary system performance in future power plants

  5. Optimal control of mode transition for four-wheel-drive hybrid electric vehicle with dry dual-clutch transmission

    Science.gov (United States)

    Zhao, Zhiguo; Lei, Dan; Chen, Jiayi; Li, Hangyu

    2018-05-01

    When the four-wheel-drive hybrid electric vehicle (HEV) equipped with a dry dual clutch transmission (DCT) is in the mode transition process from pure electrical rear wheel drive to front wheel drive with engine or hybrid drive, the problem of vehicle longitudinal jerk is prominent. A mode transition robust control algorithm which resists external disturbance and model parameter fluctuation has been developed, by taking full advantage of fast and accurate torque (or speed) response of three electrical power sources and getting the clutch of DCT fully involved in the mode transition process. Firstly, models of key components of driveline system have been established, and the model of five-degrees-of-freedom vehicle longitudinal dynamics has been built by using a Uni-Tire model. Next, a multistage optimal control method has been produced to realize the decision of engine torque and clutch-transmitted torque. The sliding-mode control strategy for measurable disturbance has been proposed at the stage of engine speed dragged up. Meanwhile, the double tracking control architecture that integrates the model calculating feedforward control with H∞ robust feedback control has been presented at the stage of speed synchronization. Finally, the results from Matlab/Simulink software and hardware-in-the-loop test both demonstrate that the proposed control strategy for mode transition can not only coordinate the torque among different power sources and clutch while minimizing vehicle longitudinal jerk, but also provide strong robustness to model uncertainties and external disturbance.

  6. 77 FR 39858 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Science.gov (United States)

    2012-07-05

    ... bulk electric system reliability through steady state power flow, and contain a transient stability... Commission 18 CFR Part 40 Revisions to Electric Reliability Organization Definition of Bulk Electric System... definition of ``bulk electric system'' developed by the North American Electric Reliability Corporation (NERC...

  7. Wireless OAM transmission system based on elliptical microstrip patch antenna.

    Science.gov (United States)

    Chen, Jia Jia; Lu, Qian Nan; Dong, Fei Fei; Yang, Jing Jing; Huang, Ming

    2016-05-30

    The multiplexing transmission has always been a focus of attention for communication technology. In this paper, the radiation characteristics of circular microstrip patch antenna was firstly analyzed based on cavity model theory, and then spiral beams carrying orbital angular momentum (OAM) were generated, using elliptical microstrip patch antenna, with a single feed probe instead of a standard circular patch with two feedpoints. Moreover, by combining the proposed elliptic microstrip patch antenna with Universal Software Radio Peripheral (USRP), a wireless OAM transmission system was established and the real-time transmission of text, image and video in a real channel environment was realized. Since the wireless OAM transmission has the advantage of good safety and high spectrum utilization efficiency, this work has theoretical significance and potential application.

  8. EBT-S ECH transmission systems

    International Nuclear Information System (INIS)

    White, T.

    1983-01-01

    Over the past 18 months the EBT-S 28-GHz 200 kW cw mixed mode ECH system efficiency has increased from 70 to 80% by the substitution of 90 0 smooth radius W/G bends for the earlier miter bends, by eliminating several mode absorbers necessary for miter bend operation, and by optimizing the microwave coupling through the quasi-optical toroidal distribution manifold. Along with reduced system losses, these improvements have allowed the gyrotron sources to operate in a wider parameter range with high dc to rf conversion efficiency than previously attainable. Other components that have been developed besides radiused bends include T/sub i/O 2 mode absorbers, power splitters, bellows, and several types of high field mixed mode launchers. Details on these components will be presented as time allows

  9. MODEL OF CHANNEL AIRBORN ELECTRICAL POWER SYSTEM

    Directory of Open Access Journals (Sweden)

    A. G. Demchenko

    2014-01-01

    Full Text Available This article is devoted to math modeling of channel of alternate current airborne electrical power-supply system. Considered to modeling of synchronous generator that runs on three-phase static load.

  10. Exomars 2016 Mission Electrical Power System

    Directory of Open Access Journals (Sweden)

    Ciancetta Ezio

    2017-01-01

    This paper outlines the Exomars 2016 Electrical Power System (EPS design, providing a description of the major design drivers and resulting configuration, with a view to highlight aspects that could be considered for future designs.

  11. Harmonic Analysis of Electric Vehicle Loadings on Distribution System

    Energy Technology Data Exchange (ETDEWEB)

    Xu, Yijun A [University of Southern California, Department of Electrical Engineering; Xu, Yunshan [University of Southern California, Department of Electrical Engineering; Chen, Zimin [University of Southern California, Department of Electrical Engineering; Peng, Fei [University of Southern California, Department of Electrical Engineering; Beshir, Mohammed [University of Southern California, Department of Electrical Engineering

    2014-12-01

    With the increasing number of Electric Vehicles (EV) in this age, the power system is facing huge challenges of the high penetration rates of EVs charging stations. Therefore, a technical study of the impact of EVs charging on the distribution system is required. This paper is applied with PSCAD software and aimed to analyzing the Total Harmonic Distortion (THD) brought by Electric Vehicles charging stations in power systems. The paper starts with choosing IEEE34 node test feeder as the distribution system, building electric vehicle level two charging battery model and other four different testing scenarios: overhead transmission line and underground cable, industrial area, transformer and photovoltaic (PV) system. Then the statistic method is used to analyze different characteristics of THD in the plug-in transient, plug-out transient and steady-state charging conditions associated with these four scenarios are taken into the analysis. Finally, the factors influencing the THD in different scenarios are found. The analyzing results lead the conclusion of this paper to have constructive suggestions for both Electric Vehicle charging station construction and customers' charging habits.

  12. 75 FR 62476 - Ultra-Wideband Transmission Systems

    Science.gov (United States)

    2010-10-12

    ... would be obtained from measurements taken with the system operating in its normal operating mode. At the... with the transmitter operating continuously at a fundamental transmission frequency. 9. Subsequent to... systems, measured in their normal operating modes, is less than that of a UWB transmitter employing...

  13. Switching conditions in the electric power system

    International Nuclear Information System (INIS)

    Tsukushi, M.; Hirasawa, K.; Kurosawa, Y.

    1991-01-01

    This paper reports that a circuit breaker must be capable of making, carrying, and interrupting the current under both normal and abnormal conditions, especially in the case of a short-circuit fault. Before installing a circuit breaker, it is necessary to estimate the maximum short-circuit current that can occur in the electric power system and then select a circuit breaker that can interrupt and make the estimated current. Many types of short-circuit faults occur in electric power systems

  14. Electrical Ground System Design of PEFP

    International Nuclear Information System (INIS)

    Mun, Kyeong Jun; Jeon, Gye Po; Park, Sung Sik; Min, Yi Sub; Nam, Jung Min; Cho, Jang Hyung; Kim, Jun Yeon

    2010-01-01

    Since host site host site was selected Gyeong-ju city in January, 2006. we need design revision of Proton Accelerator research center to reflect on host site characteristics and several conditions. In this paper, electrical grounding and lightning protection design scheme is introduced. In electrical grounding system design of PEFP, we classified electrical facilities into 4 groups; equipment grounding (type A), instrument grounding (Type A), high frequency instrument grounding (Type C) and lightning arrestor grounding (Type D). Lightning protection system is designed in all buildings of proton accelerator research center of PEFP, including switchyard

  15. Electrical Ground System Design of PEFP

    Energy Technology Data Exchange (ETDEWEB)

    Mun, Kyeong Jun; Jeon, Gye Po; Park, Sung Sik; Min, Yi Sub; Nam, Jung Min; Cho, Jang Hyung; Kim, Jun Yeon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2010-10-15

    Since host site host site was selected Gyeong-ju city in January, 2006. we need design revision of Proton Accelerator research center to reflect on host site characteristics and several conditions. In this paper, electrical grounding and lightning protection design scheme is introduced. In electrical grounding system design of PEFP, we classified electrical facilities into 4 groups; equipment grounding (type A), instrument grounding (Type A), high frequency instrument grounding (Type C) and lightning arrestor grounding (Type D). Lightning protection system is designed in all buildings of proton accelerator research center of PEFP, including switchyard

  16. Microwave energy transmission system for solar power station

    Energy Technology Data Exchange (ETDEWEB)

    Matsumoto, Hiroshi

    1988-05-05

    This paper deals with a microwave wireless energy transmission system which will be required for a solar power station under investigation, particularly, it describes its foundation and future investigation. It is supposed that for realization of microwave wireless transmission techniques, it is most important to investigate the effect of strong microwave beams on a plasma environment, establish control techniques for microwave beams in which a retro-directive system is combined with a computer control system, and develop a semiconductor transmission module. Institute of Space and Astronautical Science (Japan) made an experiment on the effect of microwaves on ionospheric plasma by using an observatory rocket. The institute has planned to make an experiment on a microwave energy transmission system which is to be mounted to a small-scale space flyer unit in order to examine the control of microwave beams and 10 KW power transmission, in addition to investigation on the interaction of microwave energy beams with a plasma environment. (4 figs, 3 tabs, 20 refs)

  17. Design of data transmission for a portable DAQ system

    International Nuclear Information System (INIS)

    Zhou Wenxiong; Nan Gangyang; Zhang Jianchuan; Wang Yanyu

    2014-01-01

    Field Programmable Gate Array (FPGA), combined with ARM (Advanced RISC Machines) is increasingly employed in the portable data acquisition (DAQ) system for nuclear experiments to reduce the system volume and achieve powerful and multifunctional capacity. High-speed data transmission between FPGA and ARM is one of the most challenging issues for system implementation. In this paper, we propose a method to realize the high-speed data transmission by using the FPGA to acquire massive data from FEE (Front-end electronics) and send it to the ARM whilst the ARM to transmit the data to the remote computer through the TCP/IP protocol for later process. This paper mainly introduces the interface design of the high-speed transmission method between the FPGA and the ARM, the transmission logic of the FPGA, and the program design of the ARM. The theoretical research shows that the maximal transmission speed between the FPGA and the ARM through this way can reach 50 MB/s. In a realistic nuclear physics experiment, this portable DAQ system achieved 2.2 MB/s data acquisition speed. (authors)

  18. Technology Transmission Across National Innovation Systems

    DEFF Research Database (Denmark)

    Haakonsson, Stine Jessen; Slepniov, Dmitrij

    This paper advances our understanding of how technology upgrading in the Chinese wind turbine industry is linked to internationalisation of Danish component suppliers. In order to grasp the interlinkages and implications hereof, the paper combines perspectives of global value chains (GVC), national.......e. linking up with global suppliers in the wind turbine global value chain, and the new role of component suppliers as technology transmitters across national innovation systems into emerging markets. Conceptually, the paper contributes to understanding how technological catching up in value chains links...

  19. Technology Transmission Across National Innovation Systems

    DEFF Research Database (Denmark)

    Haakonsson, Stine Jessen; Slepniov, Dmitrij

    2018-01-01

    This paper advances our understanding of how technology upgrading in the Chinese wind turbine industry is linked to internationalisation of Danish component suppliers. In order to grasp the interlinkages and implications hereof, the paper combines perspectives of global value chains (GVC), national.......e. linking up with global suppliers in the wind turbine global value chain, and the new role of component suppliers as technology transmitters across national innovation systems into emerging markets. Conceptually, the paper contributes to understanding how technological catching up in value chains links...

  20. Cryogenic System for a High-Temperature Superconducting Power Transmission Cable

    International Nuclear Information System (INIS)

    Demko, J.A.; Gouge, M.J.; Hughey, R.L.; Lue, J.W.; Martin, R.; Sinha, U.; Stovall, J.P.

    1999-01-01

    High-temperature superconducting (HTS) cable systems for power transmission are under development that will use pressurized liquid nitrogen to provide cooling of the cable and termination hardware. Southwire Company and Oak Ridge National Laboratory have been operating a prototype HTS cable system that contains many of the typical components needed for a commercial power transmission application. It is being used to conduct research in the development of components and systems for eventual commercial deployment. The cryogenic system was built by Air Products and Chemicals, Allentown, Pennsylvania, and can circulate up to 0.35 kg/s of liquid nitrogen at temperatures as low as 67 K at pressures of 1 to 10 bars. Sufficient cooling is provided for testing a 5-m-long HTS transmission cable system that includes the terminations required for room temperature electrical connections. Testing of the 5-m HTS transmission cable has been conducted at the design ac conditions of 1250 A and 7.5 kV line to ground. This paper contains a description of the essential features of the HTS cable cryogenic system and performance results obtained during operation of the system. The salient features of the operation that are important in large commercial HTS cable applications will be discussed

  1. Modelling carbon emissions in electric systems

    International Nuclear Information System (INIS)

    Lau, E.T.; Yang, Q.; Forbes, A.B.; Wright, P.; Livina, V.N.

    2014-01-01

    Highlights: • We model carbon emissions in electric systems. • We estimate emissions in generated and consumed energy with UK carbon factors. • We model demand profiles with novel function based on hyperbolic tangents. • We study datasets of UK Elexon database, Brunel PV system and Irish SmartGrid. • We apply Ensemble Kalman Filter to forecast energy data in these case studies. - Abstract: We model energy consumption of network electricity and compute Carbon emissions (CE) based on obtained energy data. We review various models of electricity consumption and propose an adaptive seasonal model based on the Hyperbolic tangent function (HTF). We incorporate HTF to define seasonal and daily trends of electricity demand. We then build a stochastic model that combines the trends and white noise component and the resulting simulations are estimated using Ensemble Kalman Filter (EnKF), which provides ensemble simulations of groups of electricity consumers; similarly, we estimate carbon emissions from electricity generators. Three case studies of electricity generation and consumption are modelled: Brunel University photovoltaic generation data, Elexon national electricity generation data (various fuel types) and Irish smart grid data, with ensemble estimations by EnKF and computation of carbon emissions. We show the flexibility of HTF-based functions for modelling realistic cycles of energy consumption, the efficiency of EnKF in ensemble estimation of energy consumption and generation, and report the obtained estimates of the carbon emissions in the considered case studies

  2. Transmission electron microscopy of Listeria innocua treated by pulsed electric fields and nisin in skimmed milk.

    Science.gov (United States)

    Calderón-Miranda, M L; Barbosa-Cánovas, G V; Swanson, B G

    1999-10-01

    Pulsed electric fields (PEF) is a nonthermal food preservation process where organoleptic and nutritional properties of the food are maintained. PEF is known to inactivate microorganisms by causing dielectric breakdown of the cell membrane, thus altering the functionality of the membrane as a semipermeable barrier. The extent of damage of the cell membrane, whether visible in the form of a pore or as loss of membrane functionality leads to the inactivation of the microorganism. The objective of this study was to investigate under transmission electron microscopy (TEM) the morphological changes on Listerit innocua as a result of PEF treatment in skimmed milk containing nisin. L. innocua was subjected to PEF at selected electric field intensities of 30, 40, and 50 kV/cm. L. innocua was treated by PEF in both skimmed milk with and without 37 IU nisin/ml. L. innocua treated by PEF in skimmed milk exhibited an increase in the cell wall roughness. cytoplasmic clumping, leakage of cellular material, and rupture of the cell walls and cell membranes. L. innocua subjected to PEF in skimmed milk containing 37 IU nisin/ml exhibited an increased cell wall width. At the highest electric field intensity, 50 kV/cm, elongation of the cell length was observed. There were no morphological differences between cells treated by PEF in skimmed milk with or without nisin. The combination of PEF and nisin exhibit an additive effect in the morphological damage observed on L. innocua. Pore formation was observed on L. innocua for an electric field intensity of 40 kV/cm. The inactivation of L. innocua was a consequence of rupture of the cell membrane and loss of cell membrane functionality.

  3. 1KW Power Transmission Using Wireless Acoustic-Electric Feed-Through (WAEF)

    Science.gov (United States)

    Sherrit, S.; Bao, X.; Badescu, M.; Aldrich, J.; Bar-Cohen, Y.; Biederman, W.

    2008-01-01

    A variety of space applications require the delivery of power into sealed structures. Since the structural integrity can be degraded by holes for cabling we present an alternative method of delivering power and information using stress waves to the internal space of a sealed structure. One particular application of this technology is in sample return missions where it is critical to preserve the sample integrity and to prevent earth contamination. Therefore, the container has to be hermetically sealed and the integrity of the seal must be monitored in order to insure to a high degree of reliability the integrity of the sample return vessel. In this study we investigated the use of piezoelectric acoustic-electric power feed-through devices to transfer electric power wirelessly through a solid wall by using elastic or acoustic waves. The technology is applicable to a range of space and terrestrial applications where power is required by electronic equipment inside sealed containers, vacuum or pressure vessels, etc., where holes in the wall are prohibitive or may result in significant structural performance degradation or unnecessarily complex designs. To meet requirements of higher power applications, the feasibility to transfer kilowatts level power was investigated. Pre-stressed longitudinal piezoelectric feed-through devices were analyzed by finite element models and an equivalent circuit model was developed to predict the power transfer characteristics to different electric loads. Based on the results of the analysis a prototype device was designed, fabricated and a demonstration of the transmission of electric power up to 1.068-kW was successfully conducted. Efficiencies in the 80-90% range were also demonstrated and methods to increase the efficiency further are currently being considered.

  4. Transmission System Vegetation Management Program. Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1999-01-01

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for Bonneville and the public, and interfere with their ability to maintain these facilities. They need to (1) keep vegetation away from the electric facilities; (2) increase their program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools they can use while minimizing environmental impact (Integrated Vegetation Management). This DEIS establishes Planning Steps for managing vegetation for specific projects (to be tiered to this EIS). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed: manual, mechanical, herbicide, and biological. Also evaluated are 24 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, they consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would favor a management

  5. Economic evaluation of reliability-centred maintenance (RCM): an electricity transmission industry perspective

    International Nuclear Information System (INIS)

    Bowler, D.J.; Primrose, P.L.; Leonard, R.

    1995-01-01

    Traditional approaches to appraising the introduction of reliability centred maintenance (RCM) are shown to exhibit severe limitations. In particular, the economic implications surrounding its adoption are repeatedly mis-stated, with the consequence that organisations may be investing in unprofitable RCM ventures. Previously quoted benefits are examined and, contrary to established opinion, it is shown that these 'generalised' statements, once redeemed, are able to be quantified. The paper then proceeds to describe a financial methodology, developed by NGC and UMIST, by which the introduction of RCM can be evaluated. Moreover, it shows that, by regarding RCM as an investment decision, rather than an 'act of faith', the economic viability of a potential application can be determined before vital resources are committed. Finally, it is demonstrated that when the methodology is applied within the context of the electricity transmission industry, the economic case underlying the adoption of RCM can be realistically appraised. (author)

  6. Life Cycle Assessment of Electricity Systems

    DEFF Research Database (Denmark)

    Turconi, Roberto

    and discussed. For example, electricity used during the manufacturing of the power plant, reference year and data collection approach (process-chain or input-output analysis) strongly affected the impacts of hydro, wind and solar power. This information needs to be documented, to ensure comparability between......), as the efficiency may vary depending on the operation of the plant within the power system. The choice of LCA approach used to solve multi-functionality for combined heat and power plants strongly influenced how the environmental impact of electricity produced at such plants was estimated. When it is not possible...... on aggregated modelling. The results showed that an increase in wind power causes greater emissions from other power plants in the electricity system (which need to ‘cycle’ – adjust their production – more frequently); however, considering the entire electricity system, increasing wind power penetration reduces...

  7. Electric power system / emergency power supply

    International Nuclear Information System (INIS)

    Dorn, P.G.

    1980-01-01

    One factor of reliability of reactor safety systems is the integrity of the power supply. The purpose of this paper is a review and a discussion of the safety objectives required for the planning, licensing, manufacture and erection of electrical power systems and components. The safety aspects and the technical background of the systems for - the electric auxiliary power supply system and - the emergency power supply system are outlined. These requirements result specially from the safety standards which are the framework for the studies of safety analysis. The overall and specific requirements for the electrical power supply of the safety systems are demonstrated on a 1300 MW standard nuclear power station with a pressurized water reactor. (orig.)

  8. Stokes Space in Direct-Detection Data Transmission Systems

    DEFF Research Database (Denmark)

    Estaran Tolosa, Jose Manuel; Lu, Xiaofeng; Zibar, Darko

    2015-01-01

    Stokes-based processing permits complete and phase-insensitive characterization of the field’s SOP, readily unlocking polarization diversity in transmission systems where DD is desired. We present an overview on Stokes notions and most recent achievements in this context.......Stokes-based processing permits complete and phase-insensitive characterization of the field’s SOP, readily unlocking polarization diversity in transmission systems where DD is desired. We present an overview on Stokes notions and most recent achievements in this context....

  9. Synchronization of uncertain chaotic systems using a single transmission channel

    International Nuclear Information System (INIS)

    Feng Yong; Yu Xinghuo; Sun Lixia

    2008-01-01

    This paper proposes a robust sliding mode observer for synchronization of uncertain chaotic systems with multi-nonlinearities. A new control strategy is proposed for the construction of the robust sliding mode observer, which can avoid the strict conditions in the design process of Walcott-Zak observer. A new method of multi-dimensional signal transmission via single transmission channel is proposed and applied to chaos synchronization of uncertain chaotic systems with multi-nonlinearities. The simulation results are presented to validate the method

  10. A Proposal on Low Frequency AC Transmission as a Multi-Terminal Transmission System

    Directory of Open Access Journals (Sweden)

    Achara Pichetjamroen

    2016-08-01

    Full Text Available This paper is focused on the discussion and comparison of characteristics and behavior of three low frequency ac (LFAC transmission system configurations operating under the same control scheme and conditions to identify the most promising operation system for LFAC. Merits of LFAC over high voltage direct current (HVDC are mentioned first. By changing power flow direction without auxiliary switches in multi-terminal application and easiness of short circuit protection are explained. The three configurations of LFACs are described and applied by the control scheme with the aid of the tool of the PSCAD/EMTDC software to consider the behavior of each LFAC system on line frequency and low frequency sides. For two-phase system, no fluctuation occurs on the line frequency side, which is the advantage over single-phase system. Furthermore, current rating on thyristor devices during operation and number of devices that used in each type of LFAC are calculated and compared. These results can lead to determine the most suitable transmission system for the LFAC system operation.

  11. Designing a sustainable electric system for the 21. Century. 5 sessions

    International Nuclear Information System (INIS)

    1995-01-01

    The UNIPEDE (International Union of Producers and Distributors of Electrical Energy) conference is composed of 97 communications grouped in 5 sessions which titles and main themes are: opportunities to increase electricity use for sustainable development (energy efficiency improvement, technology substitution, environmental issues); electric system expansion and integration to meet growing competition (interconnected systems, electricity transfer, distribution system upgrade, system reliability, superconductive systems); power producers and global climate change issues (electricity generation, renewable energies, combined cycle, rational energy use, reduction of emissions, efficiency improvements); technology for supplying electricity in developing and transitional economies development strategies, financial factor and international investments, technology transfer and implementation, transmission systems); power industry structure, regulatory policies and technological innovation (demand side management, deregulation, competitive energy markets, legislative and economic policy changes). 48 communications were considered in the INIS scope, 41 in the ETDE scope and 7 out of scope

  12. A data seamless interaction scheme between electric power secondary business systems

    Science.gov (United States)

    Ai, Wenkai; Qian, Feng

    2018-03-01

    At present, the data interaction of electric power secondary business systems is very high, and it is not universal to develop programs when data interaction is carried out by different manufacturers' electric power secondary business systems. There are different interaction schemes for electric power secondary business systems with different manufacturers, which lead to high development cost, low reusability and high maintenance difficulty. This paper introduces a new data seamless interaction scheme between electric power secondary business systems. The scheme adopts the international common Java message service protocol as the transmission protocol, adopts the common JavaScript object symbol format as the data interactive format, unified electric power secondary business systems data interactive way, improve reusability, reduce complexity, monitor the operation of the electric power secondary business systems construction has laid a solid foundation.

  13. Electric distribution systems and embedded generation capacity

    International Nuclear Information System (INIS)

    Calderaro, V.; Galdi, V.; Piccolo, A.; Siano, P.

    2006-01-01

    The main policy issues of European States are sustainable energy supply promotion and liberalization of energy markets, which introduced market competition in electricity production and created support mechanisms to encourage renewable electricity production and consumption. As a result of liberalization, any generator, including small-scale and renewable energy based units, can sell electricity on the free market. In order to meet future sustainability targets, connection of a higher number of Distributed Generation (DG) units to the electrical power system is expected, requiring changes in the design and operation of distribution electricity systems, as well as changes in electricity network regulation. In order to assist distribution system operators in planning and managing DG connections and in maximizing DG penetration and renewable sources exploitation, this paper proposed a reconfiguration methodology based on a Genetic Algorithm (GA), that was tested on a 70-bus system with DG units. The simulation results confirmed that the methodology represents a suitable tool for distribution system operators when dealing with DG capacity expansion and power loss issues, providing information regarding the potential penetration network-wide and allowing maximum exploitation of renewable generation. 35 refs., 4 tabs., 6 figs

  14. Solar/electric heating systems for the future energy system

    DEFF Research Database (Denmark)

    Furbo, Simon; Dannemand, Mark; Perers, Bengt

    elements/heat pump, advanced heat storage tanks and advanced control systems. Heat is produced by solar collectors in sunny periods and by electrical heating elements/heat pump. The electrical heating elements/heat pump will be in operation in periods where the heat demand cannot be covered by solar energy....... The aim is to use the auxiliary heating units when the electricity price is low, e.g. due to large electricity production by wind turbines. The unit is equipped with an advanced control system where the control of the auxiliary heating is based on forecasts of the electricity price, the heat demand...

  15. Minutes of the Meeting - Pennsylvania Electric Association, Engineering Section, Transmission and Distribution Committee, Spring, 1981

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    Proceedings includes 8 papers dealing with underground and submarine crossings of electric power cables, underground fault locating equipment, lightning arresters, the current carrying capacity of conductors in distribution systems, emergency warning facilities in nuclear power plants, and the use of fiberglass/polyester materials in fiberglass poles

  16. Design of electric control system for automatic vegetable bundling machine

    Science.gov (United States)

    Bao, Yan

    2017-06-01

    A design can meet the requirements of automatic bale food structure and has the advantages of simple circuit, and the volume is easy to enhance the electric control system of machine carrying bunch of dishes and low cost. The bundle of vegetable machine should meet the sensor to detect and control, in order to meet the control requirements; binding force can be adjusted by the button to achieve; strapping speed also can be adjusted, by the keys to set; sensors and mechanical line connection, convenient operation; can be directly connected with the plug, the 220V power supply can be connected to a power source; if, can work, by the transmission signal sensor, MCU to control the motor, drive and control procedures for small motor. The working principle of LED control circuit and temperature control circuit is described. The design of electric control system of automatic dish machine.

  17. SELF: expert system for supporting verification of network operating constraints in power transmission planning

    Energy Technology Data Exchange (ETDEWEB)

    Cicoria, R; Migliardi, P [Ente Nazionale per l` Energia Elettrica, Milan (Italy); Pogliano, P [Centro Informazioni Studi Esperienze (CISE), Milan (Italy)

    1995-06-01

    Performing planned studies into very large HV transmission systems is a very complex task which requires the use of simulation models and the application of the heuristic acquired by expert palnners during previous studies. The ENEL Electric Research Center and the CISE Artificial Intelligence Section have developed a knowledge-based system, named SELF, which is aimed at supporting the transmission system palnner. SELF is capable of assisting the engineer both in finding the convergence of the load flow calculation and determining solutions that respect active power, voltage and VAR operating constraints. This paper describes the overall architecture of the system and shows its integration in a larger planning environment called SPIRA, currently utilized at ENEL. More details are given on the least completed modules, the redispatching and network reinforcement subsystems which deal with active power constraint verification.

  18. Collapse and pull - down analysis of high voltage electricity transmission towers subjected to cyclonic wind

    International Nuclear Information System (INIS)

    Ahmed, Ammar; Arthur, Craig; Edwards, Mark

    2010-01-01

    Bulk electricity transmission lines are linear assets that can be very exposed to wind effects, particularly where they traverse steep topography or open coastal terrain in cyclonic regions. Interconnected nature of the lattice type towers and conductors also, present complex vulnerabilities. These relate to the direction of wind attack to the conductors and the cascading failure mechanisms in which the failure of a single tower has cascading effects on neighbouring towers. Such behaviour is exacerbated by the finely tuned nature of tower design which serves to minimize cost and reserve strength at design wind speeds. There is a clear need to better quantify the interdependent vulnerabilities of these critical infrastructure assets in the context of the severe wind hazard. This paper presents a novel methodology developed for the Critical Infrastructure Protection Modelling and Analysis (CIPMA) capability for assessing local wind speeds and the likelihood of tower failure for a range of transmission tower and conductor types. CIPMA is a program managed by the Federal Attorney-General's Department and Geoscience Australia is leading the technical development. The methodology then involves the development of heuristically derived vulnerability models that are consistent with Australian industry experience and full-scale static tower testing results, considering isolated tower loss along with three interdependent failure mechanisms to give overall likelihoods of failure.

  19. Adequacy assessment of composite generation and transmission systems incorporating wind energy conversion systems

    Science.gov (United States)

    Gao, Yi

    The development and utilization of wind energy for satisfying electrical demand has received considerable attention in recent years due to its tremendous environmental, social and economic benefits, together with public support and government incentives. Electric power generation from wind energy behaves quite differently from that of conventional sources. The fundamentally different operating characteristics of wind energy facilities therefore affect power system reliability in a different manner than those of conventional systems. The reliability impact of such a highly variable energy source is an important aspect that must be assessed when the wind power penetration is significant. The focus of the research described in this thesis is on the utilization of state sampling Monte Carlo simulation in wind integrated bulk electric system reliability analysis and the application of these concepts in system planning and decision making. Load forecast uncertainty is an important factor in long range planning and system development. This thesis describes two approximate approaches developed to reduce the number of steps in a load duration curve which includes load forecast uncertainty, and to provide reasonably accurate generating and bulk system reliability index predictions. The developed approaches are illustrated by application to two composite test systems. A method of generating correlated random numbers with uniform distributions and a specified correlation coefficient in the state sampling method is proposed and used to conduct adequacy assessment in generating systems and in bulk electric systems containing correlated wind farms in this thesis. The studies described show that it is possible to use the state sampling Monte Carlo simulation technique to quantitatively assess the reliability implications associated with adding wind power to a composite generation and transmission system including the effects of multiple correlated wind sites. This is an important

  20. Energetic diversification in the interconnected electric system

    International Nuclear Information System (INIS)

    Villanueva M, C.; Beltran M, H.; Serrano G, J.A.

    2007-01-01

    In the interconnected electric system of Mexico the demanded electricity in different timetable periods it is synthesized in the annual curve of load duration, which is characterized by three regions. The energy in every period is quantified according to the under curve areas in each region, which depend of the number of hours in that the power demand exceeds the minimum and the intermediate demands respectively that are certain percentages of the yearly maximum demand. In that context, the generating power stations are dispatched according to the marginal costs of the produced electricity and the electric power to be generated every year by each type of central it is located in some of the regions of the curve of load duration, as they are their marginal costs and their operation characteristic techniques. By strategic reasons it is desirable to diversify the primary energy sources that are used in the national interconnected system to generate the electricity that demand the millions of consumers that there are in Mexico. On one hand, when intensifying the use of renewable sources and of nucleo electric centrals its decrease the import volumes of natural gas, which has very volatile prices and it is a fuel when burning in the power stations produces hothouse gases that are emitted to the atmosphere. On the other hand, when diversifying the installed capacity of the different central types in the interconnected system, a better adaptation of the produced electricity volumes is achieved by each type to the timetable variation, daily, weekly and seasonal of the electric demand, as one manifests this in the curve of load duration. To exemplify a possible diversification plan of the installed capacity in the national interconnected system that includes nucleo electric centrals and those that use renewable energy, charts are presented that project of 2005 at 2015 the capacity, energy and ost of the electricity of different central types, located in each one of the