WorldWideScience

Sample records for electricity supply company reactor

  1. Supply of appropriate nuclear technology for the developing world: small power reactors for electricity generation

    International Nuclear Information System (INIS)

    Heising-Goodman, C.D.

    1981-01-01

    This paper reviews the supply of small nuclear power plants (200 to 500 MWe electrical generating capacity) available on today's market, including the pre-fabricated designs of the United Kingdom's Rolls Royce Ltd and the French Alsthom-Atlantique Company. Also, the Russian VVER-440 conventionally built light-water reactor design is reviewed, including information on the Soviet Union's plans for expansion of its reactor-building capacity. A section of the paper also explores the characteristics of LDC electricity grids, reviewing methods available for incorporating larger plants into smaller grids as the Israelis are planning. Future trends in reactor supply and effects on proliferation rates are also discussed, reviewing the potential of the Indian 220 MWe pressurised heavy-water reactor, South Korean and Jananese potential for reactor exports in the Far East, and the Argentine-Brazilian nuclear programme in Latin America. This study suggests that small reactor designs for electrical power production and other applications, such as seawater desalination, can be made economical relative to diesel technology if traditional scaling laws can be altered by adopting and standardising a pre-fabricated nuclear power plant design. Also, economy can be gained if sufficient attention is concentrated on the design, construction and operating experience of suitably sized conventionally built reactor systems. (author)

  2. The fast reactor and electricity supply, a utility view

    International Nuclear Information System (INIS)

    Wright, J.K.; Hall, R.S.; Kemmish, W.B.; Thorne, R.T.

    1982-01-01

    The significance of the fast reactor is discussed from the viewpoint of the Central Electricity Generating Board. The need for the fast reactor and a possible timescale for its introduction are examined. It is emphasised that demonstration of the commercial and environmental acceptability of the fuel cycle will be needed before any commitment can be made to fast reactors. (U.K.)

  3. Reactor coolant pump type RUV for Westinghouse Electric Company LLC reactor AP1000 TM

    International Nuclear Information System (INIS)

    Baumgarten, S.; Brecht, B.; Bruhns, U.; Fehring, P.

    2010-01-01

    The RUV is a reactor coolant pump, specially designed for the Westinghouse Electric Company LLC AP1000 TM reactor. It is a hermetically sealed, wet winding motor pump. The RUV is a very compact, vertical pump/motor unit, designed to fit into the compartment next to the reactor pressure vessel. Each of the two steam generators has two pump casings welded to the channel head by the suction nozzle. The pump/motor unit consists of a pump part, where a semi-axial impeller/diffuser combination is mounted in a one-piece pump casing. Computational Fluid Dynamics methods combined with various hydraulic tests in a 1:2 scale hydraulic test assure full compliance with the specific customer requirements. A short and rigid shaft, supported by a radial bearing, connects the impeller with the high inertia flywheel. This flywheel consists of a one-piece forged stainless steel cylinder, with an option for several smaller heavy metal cylinders inside. The flywheel is located inside the thermal barrier, which forms part of the pressure boundary. A specific arrangement of cooling water circuits guarantees a homogeneous temperature distribution in and around the flywheel, minimizes the friction losses of the flywheel and protects the motor from hot coolant. The driving torque is transmitted by the motor shaft, which itself is supported by two radial bearings. A three-phase, high-voltage squirrel-cage induction motor generates the driving torque. Due to the wet winding concept it is possible to achieve positive effects regarding motor lifetime. The cooling water is forced through the stator windings and the gap between rotor and stator by an auxiliary impeller. Furthermore, this wet winding motor concept has higher efficiency as compared to a canned motor since there are no eddy current losses. As part of the design process and in addition to the hydraulic scale model, a complete half scale model pump was built. It was used to verify the calculations performed like coast

  4. Electricity supply

    International Nuclear Information System (INIS)

    Rezendes, V.S.

    1991-10-01

    This report focuses on the Securities and Exchange Commission's (SEC) administration of the Public Utility Holding Company Act of 1935, intended to protect the public, investors, and consumers from abuses associated with the control of electric and gas utility companies through the holding company structure. These abuses include subjecting subsidiary utilities to excessive charges for services, construction work, and materials; frustrating effective state regulation through the holding company structure; and overloading subsidiary utilities with debt to prevent voluntary rate reductions. GAO discusses industry changes during the past decade involving electric utility holding companies; SEC's regulatory response to such changes; and the relationship between SEC, the Federal Energy Regulatory Commission, and states in protecting consumer and investor interests in light of these changes

  5. Design study of electrical power supply system for tokamak fusion power reactor

    International Nuclear Information System (INIS)

    1977-01-01

    Design study of the electrical power supply system for a 2000MWt Tokamak-type fusion reactor has been carried out. The purposes are to reveal and study problems in the system, leading to a plan of the research and development. Performed were study of the electrical power supply system and design of superconducting inductive energy storages and power switches. In study of the system, specification and capability of various power supplies for the fusion power reactor and design of the total system with its components were investigated. For the superconducting inductive energy storages, material choice, design calculation, and structural design were conducted, giving the size, weight and performance. For thyristor switches, circuit design in the parallel / series connection of element valves and cooling design were studied, providing the size and weight. (auth.)

  6. Advanced marine reactor MRX and application to nuclear barge supplying electricity and heat

    International Nuclear Information System (INIS)

    Ishida, Toshihisa; Kusunoki, Tsuyoshi; Odano, Naoteru; Yoritsune, Tsutomu; Fukuhara, Yoshifumi; Ochiai, Masa-aki

    2000-01-01

    The basic design concept of an advanced marine reactor MRX has been established with adoption of several new technologies. The MRX is an integral-type PWR with 100 MWt aimed basically for use of ship propulsion. Adoption of a water-filled containment together with the integral type reactor makes the reactor light-weight and compact greatly. A engineered safety system is a simplified passive system, function of which is confirmed by the safety analysis. The MRX can be applied to an energy supply system of electricity and heat co-generation by installing it on a barge. Concept of a nuclear barge with the MRX of 334 MWt output is presented for use of supplying electricity, fresh water and hot water. Combined system of electric generation and desalination with the RO process can deliver variable output of electricity and fresh water according a demand. Latent heat of the exhausted steam from the turbine can be used effectively to raise the temperature of cold water as heat supply. (author)

  7. Use of small reactors as an alternative to supply electricity to Baja California Sur

    International Nuclear Information System (INIS)

    Alonso, G.; Portes, E.; Ramirez, J. R.; Ortega, G.

    2016-09-01

    The state of Baja California Sur (Mexico) does not form part of the national interconnected electrical system of the country, reason why is local its electrical power supply; one of the alternatives to cover future demands is the use of gas-based combined cycles, which presents the additional problem of including a high price for gas transportation in its costs. In order to reduce total costs, including investment, fuels and operation and maintenance in the operation of the Baja California Sur state electricity system in the coming years, mainly due to the estimated natural gas cost order of $11.50 dollars per million BTU, a proposal is presented to reduce the costs of the electrical system by replacing the necessary combined cycles with the new Small Modular Reactor type nuclear reactors, this alternative is economically competitive. (Author)

  8. Small nuclear power reactor emergency electric power supply system reliability comparative analysis

    International Nuclear Information System (INIS)

    Bonfietti, Gerson

    2003-01-01

    This work presents an analysis of the reliability of the emergency power supply system, of a small size nuclear power reactor. Three different configurations are investigated and their reliability analyzed. The fault tree method is used as the main tool of analysis. The work includes a bibliographic review of emergency diesel generator reliability and a discussion of the design requirements applicable to emergency electrical systems. The influence of common cause failure influences is considered using the beta factor model. The operator action is considered using human failure probabilities. A parametric analysis shows the strong dependence between the reactor safety and the loss of offsite electric power supply. It is also shown that common cause failures can be a major contributor to the system reliability. (author)

  9. Expert systems for analysis and management assistance of nuclear reactor electrical power supplies

    International Nuclear Information System (INIS)

    Evrard, J.M.; Souchet, Y.

    1988-01-01

    Electrical power supplies of nuclear plants are very complex systems. They are studied in many ways: failure consequences, probabilistic risk assessement, failure diagnosis, corrective actions in case of incident ... Knowledge base technology (expert systems) is very suited to solve these problems. A common structural representation can generate specific functional representations; thus we get coherency and easy evolution. This paper shows a two facet methodology: the plant description (both static and dynamic) and reasoning about it. Current applications are developed for pressurized water reactors and gas cooled reactors, using the SPIRAL expert system shell buil at CEA [fr

  10. Technical and economic studies of small reactors for supply of electricity and steam

    International Nuclear Information System (INIS)

    Spiewak, I.; Klepper, O.H.; Fuller, L.C.

    1977-02-01

    Several years ago conventional opinion held that nuclear power plants must be very large to be competitive with fossil fuels. This situation has changed markedly in most countries within recent years, as oil and gas supplies have become more scarce and costly. Studies have been carried out for several nuclear steam supply systems in the small and intermediate size range. Detail studies are reported of the Consolidated Nuclear Steam Generator (CNSG), a 365 MW(th) pressurized water reactor being developed by Babcock and Wilcox, as applied to industrial energy needs. Both conventional and barge-mounted nuclear steam supply systems are considered. Conceptual studies have been started of pressurized and boiling water reactors in the range of 1000 MW(th), which are envisioned for utility operation for supply of electric power and steam. Design studies of a 500 MW(th) high temperature reactor are also reported. The small reactors are expected to have higher unit costs than the large commercial plants, but to have compensating advantages in higher plant availability, shorter construction schedule, and greater siting flexibility. Studies are also reported of power cycle parameters and cost allocations for extraction of steam from steam turbine plants. This steam could be used for industrial energy, district heating, or desalination

  11. Technical and economic studies of small reactors for supply of electricity and steam

    International Nuclear Information System (INIS)

    Spiewak, I.; Klepper, O.H.; Fuller, L.C.

    1977-01-01

    Several years ago conventional opinion held that nuclear power plants must be very large to be competitive with fossil fuels. This situation has changed markedly in most countries within recent years, as oil and gas supplies have become more scarce and costly. Studies have been carried out of several nuclear steam supply systems in the small and intermediate size range. Detail studies are reported of the Consolidated Nuclear Steam Generator (CNSG), a 313 MW(t) pressurized water reactor being developed by Babcock and Wilcox, as applied to industrial energy needs. Both conventional and barge-mounted nuclear steam supply systems are considered. Conceptual studies have been started of pressurized and boiling water reactors in the range of 1000 MW(t), which are envisioned for utility operation for supply of electric power and steam. Design studies of a 500 MW(t) high temperature reactor are also reported. The small reactors are expected to have higher unit costs than the large commercial plants, but to have compensating advantages in higher plant availability, shorter construction schedule and greater siting flexibility. Studies are also reported of power cycle parameters and cost allocations for extraction of steam from steam turbine plants. This steam could be used for industrial energy, district heating or desalination

  12. Technical and economic studies of small reactors for supply of electricity and steam

    International Nuclear Information System (INIS)

    Spiewak, I.; Klepper, O.H.; Fuller, L.C.

    1977-01-01

    Several years ago conventional opinion held that nuclear power plants must be very large to be competitive with fossil fuels. This situation has changed markedly in most countries within recent years, as oil and gas supplies have become more scarce and costly. Studies have been carried out of several nuclear steam supply systems in the small and intermediate size range. Detail studies are reported of the Consolidated Nuclear Steam Generator (CNSG), a 313MW(th) pressurized water reactor being developed by Babcock and Wilcox, as applied to industrial energy needs. Both conventional and barge-mounted nuclear steam supply systems are considered. Conceptual studies have been started of pressurized and boiling water reactors in the range of 1000MW(th), which are envisioned for utility operation for supply of electric power and steam. Design studies of a 500MW(th) high temperature reactor are also reported. The small reactors are expected to have higher unit costs than the large commercial plants, but to have compensating advantages in higher plant availability, shorter construction schedule and greater siting flexibility. Studies are also reported of power cycle parameters and cost allocations for extraction of steam from steam turbine plants. This steam could be used for industrial energy, district heating or desalination. (author)

  13. Preliminary irradiation test results from the Yankee Atomic Electric Company reactor vessel test irradiation program

    International Nuclear Information System (INIS)

    Biemiller, E.C.; Fyfitch, S.; Campbell, C.A.

    1993-01-01

    The Yankee Atomic Electric Company test irradiation program was implemented to characterize the irradiation response of representative Yankee Rowe reactor vessel beltline plate materials and to remove uncertainties in the analysis of existing irradiation data on the Yankee Rowe reactor vessel steel. Plate materials each containing 0.24 w/o copper, but different nickel contents at 0.63 w/o and 0.19 w/o, were heat treated to simulate the Yankee vessel heat treatment (austenitized at 1800 deg F) and to simulate Regulatory Guide 1.99 database materials (austenitized at 1600 deg. F). These heat treatments produced different microstructures so the effect of microstructure on irradiation damage sensitivity could be tested. Because the nickel content of the test plates varied and the copper level was constant, the effect of nickel on irradiation embrittlement was also tested. Correlation monitor material, HSST-02, was included in the program to benchmark the Ford Nuclear Reactor (U. of Michigan Test Reactor) which had never been used for this type of irradiation program. Materials taken from plate surface locations (vs. 1/4T) were included to test whether or not the improved toughness properties of the plate surface layer, resulting from the rapid quench, is maintained after irradiation. If the improved properties are maintained, pressurized thermal shock calculations could utilize this margin. Finally, for one experiment, irradiations were conducted at two irradiation temperatures (500 deg. F and 550 deg. F) to determine the effect of irradiation temperature on embrittlement. The preliminary results of the irradiation program show an increase in T 30 shift of 69 deg. F for a decrease in irradiation temperature of 50 deg. F. The results suggest that for nickel bearing steels, the superior toughness of plate surface material is maintained after irradiation and for the copper content tested, nickel had no apparent effect on irradiation response. No apparent microstructure

  14. Preliminary irradiation test results from the Yankee Atomic Electric Company reactor vessel test irradiation program

    International Nuclear Information System (INIS)

    Biemiller, E.C.; Fyfitch, Stephen; Campbell, C.A.

    1994-01-01

    The Yankee Atomic Electric Company test irradiation program was implemented to characterize the irradiation response of representative Yankee Rowe reactor vessel beltline plate materials and to remove uncertainties in the analysis of existing irradiation data on the Yankee Rowe reactor vessel steel. Plate materials each containing 0.24 w/o copper, but different nickel contents at 0.63 w/o and 0.19 w/o, were heat treated to simulate the Yankee vessel heat treatment (austenitized at 982 o C (1800 o F)) and to simulate Regulatory Guide 1.99 database materials (austenitized at 871 o C (1600 o F)). These heat treatments produced different microstructures so the effect of microstructure on irradiation damage sensitivity could be tested. Because the nickel content of the test plates varied and the copper level was constant, the effect of nickel on irradiation embrittlement was also tested. Correlation monitor material, HSST-02, was included in the program to benchmark the Ford Nuclear Reactor (University of Michigan Test Reactor) which had never been used before for this type of irradiation program. Materials taken from plate surface locations (versus 1/4 T) were included to test whether or not the improved toughness properties of the plate surface layer, resulting from the rapid quench, are maintained after irradiation. If the improved properties are maintained, pressurized thermal shock calculations could utilize this margin. Finally, for one experiment, irradiations were conducted at two irradiation temperatures (260 o C and 288 o C) to determine the effect of irradiation temperature on embrittlement. (Author)

  15. NRC [Nuclear Regulatory Commission] staff evaluation of the General Electric Company Nuclear Reactor Study (''Reed Report'')

    International Nuclear Information System (INIS)

    1987-07-01

    In 1975, the General Electric Company (GE) published a Nuclear Reactor Study, also referred to as ''the Reed Report,'' an internal product-improvement study. GE considered the document ''proprietary'' and thus, under the regulations of the Nuclear Regulatory Commission (NRC), exempt from mandatory public disclosure. Nonetheless, members of the NRC staff reviewed the document in 1976 and determined that it did not raise any significant new safety issues. The staff also reached the same conclusion in subsequent reviews. However, in response to recent inquiries about the report, the staff reevaluated the Reed Report from a 1987 perspective. This re-evaluation, documented in this staff report, concluded that: (1) there are no issues raised in the Reed Report that support a need to curtail the operation of any GE boiling water reactor (BWR); (2) there are no new safety issues raised in the Reed Report of which the staff was unaware; and (3) although certain issues addressed by the Reed Report are still being studied by the NRC and the industry, there is no basis for suspending licensing and operation of GE BWR plants while these issues are being resolved

  16. Electric Holding Company Areas

    Data.gov (United States)

    Department of Homeland Security — Holding companies are electric power utilities that have a holding company structure. This vector polygon layer represents the area served by electric power holding...

  17. Review of electricity supply failures and plant improvements over 25 years operation of the Harwell materials test reactors

    International Nuclear Information System (INIS)

    Taylor, D.J.

    1986-01-01

    The evolution of the on-site electrical power sources is described, operational experience is reported and shortcomings are identified. Disturbances in the external power supplies to the reactors are listed for the past 25 years and failure probabilities are derived from this historical data. The 132 kV overhead supply to the Harwell site is identified as the source of nearly 90% of the disturbances. (author)

  18. Review of electricity supply failures and plant improvements over 25 years operation of the Harwell materials test reactors

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, D. J. [UKAEA Harwell (United Kingdom)

    1986-02-15

    The evolution of the on-site electrical power sources is described, operational experience is reported and shortcomings are identified. Disturbances in the external power supplies to the reactors are listed for the past 25 years and failure probabilities are derived from this historical data. The 132 kV overhead supply to the Harwell site is identified as the source of nearly 90% of the disturbances. (author)

  19. Outages of electric power supply resulting from cable failures Boston Edison Company system

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    Factual data are provided regarding 5 electric power supply interruptions that occurred in the Boston Metropolitan area during April to June, 1979. Common to all of these outages was the failure of an underground cable as the initiating event, followed by multiple equipment failures. There was significant variation in the voltage ratings and types of cables which failed. The investigation was unable to delineate a single specific Boston Edison design operating or maintenance practice that could be cited as the cause of the outages. After reviewing the investigative report the following actions were recommended: the development and implementation of a plan to eliminate the direct current cable network; develop a network outage restoration plan; regroup primary feeder cables wherever possible to minimize the number of circuits in manholes, and to separate feeders to high load density areas; develop a program to detect incipient cable faults; evaluate the separation of the north and south sections of Back Bay network into separate networks; and, as a minimum, install the necessary facilities to make it possible to re-energize one section without interfering with the other; and re-evaluate the cathodic protection scheme where necessary. (LCL)

  20. Gas supply and Yorkshire Electricity

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1995-04-01

    Yorkshire Electricity, among other independent suppliers of gas, now competes for a share of the United Kingdom gas market, previously monopolised by British Gas. The experience of this successful electric utility company, expanding into the industrial and domestic gas supply market is described in the article. The company`s involvement stems partly from the fact that significant volumes of gas are landed at three terminals within its franchise area. The company will also seek to use subsidaries to generate electric power from gas turbine power plants and explore the possibilities of developing combined heat and power (CHP) plants where appropriate. (UK)

  1. Modification of reactor installation in the Genkai nuclear power plant No. 1 of Kyushu Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    The Nuclear Safety Commission recognized the adequacy concerning the inquiry which was offered from the Minister of International Trade and Industry on July 25, 1979, following the safety evaluation in the Ministry of International Trade and Industry, and decided to submit a report to the Minister of International Trade and Industry on July 26, 1979, about the modification of reactor installation in the Genkai nuclear power plant No. 1 of the Kyushu Electric Power Company, Inc. This is concerned to the application which was made from the president of the Kyushu Electric Power Company, Inc., to the Minister of International Trade and Industry on July 24, 1979. The content of the modification is to add a control circuit which is actuated by the signal of abnormal low pressure in a reactor to the circuit of actuating the emergency core cooling system of the plant. The influences on the safety protection system by the addition of the circuit transmitting safety injection signal and by the additions of an interlock circuit preventing the misoperation of pressurizer spray and of a block circuit of safety injection signal in case of the abnormal low pressure in a reactor were evaluated. The effects on the function and characteristics of the emergency core cooling system due to the addition of the control circuit were investigated, and it was recognized by the analysis that there is no effect in the pipe ruptures of both small and large scales. (Nakai, Y.)

  2. Report on emergency electrical power supply systems for nuclear fuel cycle and reactor facilities security systems

    International Nuclear Information System (INIS)

    1977-01-01

    The report includes information that will be useful to those responsible for the planning, design and implementation of emergency electric power systems for physical security and special nuclear materials accountability systems. Basic considerations for establishing the system requirements for emergency electric power for security and accountability operations are presented. Methods of supplying emergency power that are available at present and methods predicted to be available in the future are discussed. The characteristics of capacity, cost, safety, reliability and environmental and physical facility considerations of emergency electric power techniques are presented. The report includes basic considerations for the development of a system concept and the preparation of a detailed system design

  3. Report on emergency electrical power supply systems for nuclear fuel cycle and reactor facilities security systems

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    The report includes information that will be useful to those responsible for the planning, design and implementation of emergency electric power systems for physical security and special nuclear materials accountability systems. Basic considerations for establishing the system requirements for emergency electric power for security and accountability operations are presented. Methods of supplying emergency power that are available at present and methods predicted to be available in the future are discussed. The characteristics of capacity, cost, safety, reliability and environmental and physical facility considerations of emergency electric power techniques are presented. The report includes basic considerations for the development of a system concept and the preparation of a detailed system design.

  4. On the legal nature of electricity supply contracts concluded by electricity companies and power stations generating electricity from renewable energy sources

    International Nuclear Information System (INIS)

    Herrmann, B.J.

    1998-01-01

    Section 2 of the German Act for enhanced use of electricity from renewable energy sources (StEG) defines the obligation to contract but not the contractual obligations, i.e. the conditions of performance of the contract (supply and purchase of electricity and the legal obligations of contractors). The analysis here shows that characterising this mandatory contract required by the act as an agreement of purchase and sale more appropriately describes the legal nature of the contract and the intent of the legislator than other contracts for supply and purchase of electricity, as for instance those concluded by electric utilities and their customers. One specific aspect elaborated by the author is that the StEG does not constitute an obligation to supply on the part of the renewable energy generating power station, so that the power station operator is not obliged to ensure availability of the electricity at any time or in terms of supplies that can be called off by the purchasing utility, whereas the electric utility is obliged by section 2 of the StEG to purchase the contractual amounts from the generating station. (orig./CB) [de

  5. Use of small reactors as an alternative to supply electricity to Baja California Sur; Uso de reactores pequenos como alternativa de suministro de electricidad para Baja California Sur

    Energy Technology Data Exchange (ETDEWEB)

    Alonso, G.; Portes, E.; Ramirez, J. R. [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico); Ortega, G., E-mail: gustavo.alonso@inin.gob.mx [Comision Federal de Electricidad, Rio Rodano No. 14, 06500 Ciudad de Mexico (Mexico)

    2016-09-15

    The state of Baja California Sur (Mexico) does not form part of the national interconnected electrical system of the country, reason why is local its electrical power supply; one of the alternatives to cover future demands is the use of gas-based combined cycles, which presents the additional problem of including a high price for gas transportation in its costs. In order to reduce total costs, including investment, fuels and operation and maintenance in the operation of the Baja California Sur state electricity system in the coming years, mainly due to the estimated natural gas cost order of $11.50 dollars per million BTU, a proposal is presented to reduce the costs of the electrical system by replacing the necessary combined cycles with the new Small Modular Reactor type nuclear reactors, this alternative is economically competitive. (Author)

  6. Installation modification of the reactor No.2 of Ikata nuclear power plant of Shikoku Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1980-01-01

    The application was made on August 25, 1979, from the president of the Shikoku Electric Power Company, Inc., to the Minister of International Trade and Industry, relating to the installation modification of the reactor No. 2 in the Ikata nuclear power plant. The inquiry was submitted on September 28, 1979, from the Minister of International Trade and Industry to the Nuclear Safety Commission, after the safety evaluation in the Ministry of International Trade and Industry, and the investigation and deliberation were started on October 1, 1979, in the Nuclear Safety Commission. The content of the modification is to add the circuit actuated by the abnormal low pressure signal of the reactor to the actuating circuit of the emergency core cooling system (ECCS) and to increase the new fuel storage capacity from about 1/3 core to about 2/3 core. The additional signal circuit is composed of the logic circuit of ''2 out of 4'' and is multichannel design. The circuit is independent from the reactor control system and the conventional signal circuit of the concurrence of low pressure in the reactor and low level in the pressurizer. With the addition of the circuit of abnormal low pressure signal of the reactor, the countermeasures for preventing ECCS start by mistake are also added. These modifications give no influence to the functions of the reactor control system and reactor protection system. The function and the performance of ECCS were analyzed and evaluated accompanying these modifications assuming the loss of coolant accident. Concerning the new fuel storage capacity, the type of racks is modified from angle type to can type, and the subcriticality is kept even at the time of water flood. (Nakai, Y.)

  7. Role Of E-Government In Delivery Of Public Services In Tanzania Electric Supply Company In Ruvuma Region Tanzania

    Directory of Open Access Journals (Sweden)

    Emmanuel Jackson Petro Gunda

    2015-06-01

    Full Text Available ABSTRACT E-government facilitates delivery of public services of relevant government information in electronic form to citizens in a timely manner and better service delivery to citizens. E-government is a kind of governmental administration which is based on Information Communication and Technology Services. Electronic government describes the use of technologies to facilitate the operation of government and disperse of government information and services. The scope of the work was limited to Tanzania Electric Supply Company Limited TANESCO in Ruvuma region. The population of thirty 31 were selected from a total population of 169 public servants use both purposive and stratified random sampling techniques applied. The major findings of study revealed that about 67.7 of response from respondents agree that ICT infrastructures specifically modern computer connected to internet reliable internet speed well organized organization website power availability in public operation contribute to efficient in delivery of services it also noted by respondents to faster decision making speeding up transaction processing and reduce cost. The study greatly recommends that capacity building to public servants on ICT install and strengthening ICT infrastructures to government organizational are inevitable to realise relevant role of e-government in delivery of public services.

  8. Switzerland's electricity supply industry

    International Nuclear Information System (INIS)

    Inwyler, Ch.

    1980-01-01

    After a short description of Switzerland's electricity supply industry, the author comments on the production and consumption of electrical energy as well as on Switzerland's role within the European grid. A brief survey of electricity supply as a service is followed by a discussion of the political tools (such as e.g. the referendum, the hearing procedure etc.), which are an essential clue for understanding the position of the electricity supply industry in Switzerland. (Auth.)

  9. Service supply company experience

    International Nuclear Information System (INIS)

    Shouldice, S.P.

    1995-01-01

    The motivations for a small company to go international were reviewed, as well as the efforts required to identify markets compatible with what one has to offer. The variety of approaches taken to capitalize on the perceived opportunities were summarized. Motives for going international include minimization of risk by market diversification, revenue growth, and improved profitability where there is a run-up in demand. Getting started usually includes the following six steps: (1) selecting a target market, (2) interpreting market needs, (3) understanding local decision making, (4) deciding on a proposal, (5) seeking project financing, and (6) overcoming hurdles. Setting up shop also implies seeking market commitment, finding suitable long-term accommodation, finding suitable local workers, and exploring local sourcing for materials and equipment. Having a competitive advantage is essential to penetrating international markets. A cost advantage is the most valuable. Patience, persistence and perseverance were also identified as essential virtues

  10. Perspectives of electricity supply

    International Nuclear Information System (INIS)

    1988-01-01

    The 7 papers read at the symposium discussed the following subjects: Effects of the CO 2 problems of fossil energy systems on the world climate; status and perspectives of the German electricity industry in terms of competitiveness; The European electricity market and the integrated power supply system; Power supply without nuclear power; Costs and rates for households and other customers; Renewable energy sources and their contribution to energy supply in the Federal Republic of Germany; Electricity utilities as service partners. (UA) [de

  11. Inquiry relating to modification of reactor installation of Hamaoka No. 2 nuclear power plant of Chubu Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    Application was made to the Minister of International Trade and Industry for the license relating to the modification of reactor installation of the Hamaoka No. 2 nuclear power plant, Chubu Electric Power Company, Inc., on February 8, 1979, from the president of the company. After the safety evaluation in the Ministry of International Trade and Industry was finished, inquiry was conducted to the head of the Atomic Energy Safety Commission (AESC) on May 25, 1979, from the Minister of International Trade and Industry. The investigation and discussion were commenced by the AESC on May 28, 1979. The modification of the reactor installation is the increase of spent fuel storage capacity from about 220% of in-core fuel at present to about 325%. The fundamental philosophy of the safety evaluation includes the following items; 1) the storage capacity of spent fuel is adequate, 2) the design is such that the criticality is prevented under any assumed condition, 3) the sufficient cooling capacity is kept for decay heat removal, 4) and others required for the safety. The contents of the safety examination for each philosophical item written above are presented. The increased spent fuel storage capacity is equivalent to the quantity produced in about eight years. The prevention of criticality in the spent fuel storage is carefully practiced by putting fuel assemblies in the stainless steel racks with large neutron absorption cross section and locating spent fuel assemblies at the proper distances. The effective multiplication factor is less than 0.95 at the most severe arrangement in the fuel pool. The water temperature in the pool is less than 65 deg C at about 325% core storage by operating the spent fuel pool water cooling system. The spent fuel storage racks are designed as the A class aseismatic structure. (Nakai, Y.)

  12. Electricity supply in India

    International Nuclear Information System (INIS)

    Abbott, H.J.

    1993-09-01

    This briefing deals with the electricity supply industry in India in two parts. In the first, the structure and organization of the industry is described under sections dealing with national government involvement, energy policy, state electricity boards, regional electricity boards, state corporations, the private sector and private investment in the power sector including foreign investment. Secondly, the power supply system is described covering generation, plant load factor, non-utility generation, nuclear power, transmission and distribution, system losses and electricity consumption. (8 tables) (UK)

  13. Electricity supply in Sweden 1983

    International Nuclear Information System (INIS)

    1984-01-01

    The year 1983 was characterized by a continued decrease in oil consumption and an increase in electricity consumption. Totally the supply of fuels decreased from 278TWh to 264 TWh in 1983. The electricity supply increased from 99.9 TWh in 1982 to 110.8 TWh in 1983. The consumers total energy use decreased from 358 TWh in 1982 to 355 TWh in 1983. Electricity consumption excluding transmission losses increased from 91,4 TWh in 1982 to 101.1TWh in 1983. The increase was due to electric space heating disconnectable electric boilers and to industry. At the end of 1983 the electric heating subscriptions are estimated to corresponds to 45 percent of all one-family houses. Hydropower accounted for 54 percent and nucler power accounted for 34 percent of the total supply of electricity in 1983. The highest hourly load during 1983 amounted to 20862 MW. The lowest load during 1983 amounted to 5185 MW. Ten nuclear power units were in commercial operation during the year. The energy availability figures were as follows: Barsebaeck 1 85 percent, Barsebaeck 2 82 percent, Forsmark 1 84 percent, Forsmark 2 88 percent, Oskarshamn 1 87 percent, Oskarshamn 2 83 percent, Ringhals 1 59 percent and Ringhals 2 68 percent. The production of electricity from conventional thermal power stations was only 4.0 TWh. Back pressure power in industry contributed 2.5 TWh of this figure and combined power and district heating stations 1.3 TWh. Two coal fired combined power and district heating plants were added and sevearl combined power and district heating plants have been rebuilt to be coal fired. The high voltage power grid system permits joint operation by all the power companies in the country, and the major power companies utilize the network for exchanging surplus power with other power companies. An account of the public debate on energy in Sweden during 1983 is also given.(L.E.)

  14. A model for reliability avaliation of the electrical supply source of the 1A3 and 1A4 control rods assemblies of Angra I reactor

    International Nuclear Information System (INIS)

    Yang, T.

    1978-01-01

    The reliability of the electrical power supply to the 4.16KV buses for the safety system operation of a nuclear power plant was studied. Particularly, Angra Unit I system was focused. Initially, reliability of each electrical supply source was estimated. Using a probabilistic approach based on the Markov processes, the system reliability was evaluated in terms of frequency and duration of loss of power supply and of the system failure probability evolution when one or more sources remained unavailable. Based on these results, certain reactor operating rules were proposed concerning later shutdown of the plant without compromising the nuclear reactor safety. A sensitivity analysis was also performed to show the different reliability parameter influences on final results. This analysis showed that the diesel system performs an important role in the power supply for a nuclear power plant [pt

  15. Nuclear reactor power supply

    International Nuclear Information System (INIS)

    Cook, B.M.

    1982-01-01

    The redundant signals from the sensor assemblies measuring the process parameters of a nuclear reactor power supply are transmitted each in its turn to a protection system which operates to actuate the protection apparatus for signals indicating off-process conditions. Each sensor assembly includes a number of like sensors measuring the same parameters. The sets of process signals derived from the sensor assemblies are each in its turn transmitted from the protection system to the control system which impresses control signals on the reactor or its components to counteract the tendency for conditions to drift off-normal status requiring operation of the protection system. A parameter signal selector is interposed between the protection system and the control system. This selector prevents a parameter signal of a set of signals, which differs from the other parameters signals of the set by more than twice the allowable variation of the sensors which produce the set, from passing to the control system. The selectors include a pair of signal selection units, one unit sending selected process signals to primary control channels and the other sending selected process signals to back-up control channels. Test signals are periodically impressed by a test unit on a selected pair of a selected unit and control channels. When test signals are so impressed the selected control channel is disabled from transmitting control signals to the reactor and/or its associated components. This arrangement eliminates the possibility that a single component failure which may be spurious will cause an inadvertent trip of the reactor during test

  16. The Analysis of the Reaction of the Romanian Companies Supplying Electrical Energy to the Modification of the Geopolitical Context and of the Internal Legislative Frame

    Directory of Open Access Journals (Sweden)

    Vasile Robu

    2007-12-01

    Full Text Available Supplying services in the electrical energy domain that corresponds qualitatively, at acceptable prices, in the context of the respect of the environment preservation standards and of the security of the supply, in accordance with the demands of the economic growth, represents a main component of the lasting development. In the 9th chapter of the 21st Agenda is stated that “energy is essential to the economic and social development and to a better quality of life”. At global level, given the current technological conditions and the permanent growth of the quantity of resources used, a large part of the energy is produced and consumed in an unsustainable manner. The necessity of controlling the greenhouse gas emissions and of other polluting substances imposes the increase of the efficiency of production, transportation, distribution and consumption of the energy and the growth of the use of renewable energy sources. All energy sources must be used in a manner that permits the respect of the environment on the whole. The operational research executed let us state that the defining elements of the geopolitical context influence the behaviour of the companies supplying electrical energy, which has an effect in any branch of the national economy. Such an approach is useful in the determination of the impact of the increase of electrical energy prices on the vulnerable sectors of the national economy.

  17. Nuclear power plant with boiling water reactor VK-300 for district heating and electricity supply

    International Nuclear Information System (INIS)

    Kuznetsov, Y.N.; Lisitza, F.D.; Romenkov, A.A.; Tokarev, Y.I.

    1998-01-01

    The paper considers specific design features of a pressure vessel boiling water reactor with coolant natural circulation and three-step in-vessel steam separation (at draught tube outlet of the upcomer, within zone of overflow from the upcomer to downcomer and in cyclon-type separators). Design description and analytical study results are presented for the passive core cooling system in the case of loss of preferred power and rupture in primary circuit pipeline. Specific features of a primary containment (safeguard vessel) are given for an underground NPP sited in a rock ground. (author)

  18. Electricity supply in Denmark

    International Nuclear Information System (INIS)

    1995-08-01

    Electric power was introduced in Denmark in 1891. Recently, the development of the Danish electricity supply industry has been influenced by a number of political measures aiming at a cleaner environment. The booklet gives a general introduction to the industry in Denmark. It reflects the actual supply situation and looks at the future as well as giving a survey of the historical and political background. In addition to relevant statistics, brief information is given on national energy balance, consumption, costs and pricing, distribution and transmission, end-use efficiency, electric power generation, imports and exports, wind power, cogeneration and district heating, pollutive emission, planning and Danish energy policy. There is also a list of useful addresses. (AB)

  19. Modification of reactor installation in the Takahama nuclear power plants No.1 and No.2 of Kansai Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    The Nuclear Safety Commission recognized the adequacy concerning the inquiry which was offered from the Minister of International Trade and Industry on July 24, 1979, following the safety evaluation in the Ministry of International Trade and Industry, and decided to submit a report to the Minister of International Trade and Industry on July 26, 1979, about the modification of reactor installation in the Takahama nuclear power plants No. 1 and No. 2 of the Kansai Electric Power Company, Inc. This is concerned to the application which was made from the president of the Kansai Electric Power Company, Inc., to the Minister of International Trade and Industry on July 23, 1979. The content of the modification is to add a control circuit which is actuated by the signal of abnormal low pressure in a reactor to the circuit of actuating the emergency core cooling system of the plant. The influences on the safety protection system by the addition of the circuit for transmitting safety injection signal and by the additions of an interlock circuit preventing the misoperation of pressurizer spray and of a block circuit of safety injection signal in case of the abnormal low pressure in a reactor were evaluated. The effects on the function and characteristics of the emergency core cooling system due to the addition of the control circuit were investigated, and it was recognized by the analysis that there is no effect in the pipe ruptures of both small and large scales. (Nakai, Y.)

  20. Danish electricity supply. Statistics 2003

    International Nuclear Information System (INIS)

    2004-01-01

    The Association of Danish Electric Utilities each year issues the statistical yearbook 'Danish electricity supply'. By means of brief text, figures, and tables a description is given of the electric supply sector. The report presents data for the year 2003 for consumption, prices of electric power, power generation and transmission, and trade. (ln)

  1. Danish electricity supply. Statistics 2000

    International Nuclear Information System (INIS)

    2001-07-01

    The Association of Danish Electric Utilities each year issues the statistical yearbook 'Danish electricity supply'. By means of brief text, figures, and tables a description is given of the electric supply sector. The report presents data for the year 2000 for consumption, prices of electric power; power generation and transmission, and trade. (ln)

  2. Danish electricity supply. Statistics 2002

    International Nuclear Information System (INIS)

    2003-01-01

    The Association of Danish Electric Utilities each year issues the statistical yearbook 'Danish electricity supply'. By means of brief text, figures, and tables a description is given of the electric supply sector. The report presents data for the year 2002 for consumption, prices of electric power; power generation and transmission, and trade. (ln)

  3. Electric power system / emergency power supply

    International Nuclear Information System (INIS)

    Dorn, P.G.

    1980-01-01

    One factor of reliability of reactor safety systems is the integrity of the power supply. The purpose of this paper is a review and a discussion of the safety objectives required for the planning, licensing, manufacture and erection of electrical power systems and components. The safety aspects and the technical background of the systems for - the electric auxiliary power supply system and - the emergency power supply system are outlined. These requirements result specially from the safety standards which are the framework for the studies of safety analysis. The overall and specific requirements for the electrical power supply of the safety systems are demonstrated on a 1300 MW standard nuclear power station with a pressurized water reactor. (orig.)

  4. Information Centre and ``Cockpit`` of a modern electricity supply company: the data warehouse; Informationszentrale und ``Cockpit`` eines modernen EVU: das Data Warehouse

    Energy Technology Data Exchange (ETDEWEB)

    Kuebert, K. [Unterfraenkische Ueberlandzentrale (UUEZ), Luelsfeld (Germany); Gimenez, O. [Franken-Data GmbH, Erlangen (Germany)

    1999-06-14

    Electricity supply companies have a big advantage: They continuously measure consumer behaviour, thanks to network control systems, centralised multistations and remote meter reading. However, they do not combine this data on a consistent basis frequently enough to be able to draw valuable consequences for sales and marketing. One of the few exceptions in the Unterfraenkische Ueberlandzentrale, UUeZ (Lower Franconian Electricity Supply Company). At UUeZ, the meter readings from each individual load profile meter built into the plant of customers with special contracts, are fed together into a `cockpit`. Assisted by a Data-Warehouse-Solution from FrankenData GmbH, an ingenious information system that enables longterm trends and optimisation potential to be recognised immediately was implemented. The benefits for electricity suppliers: A constant load factor and reduction of peaks, improved customer contact as well as more precise information at negotiations and therefore more advantageous contracts. Customers also benefit from the new system: They receive more economical tariffs and detailed reports about their consumer behaviour, which they can then optimise by taking appropriate measures. (orig.) [Deutsch] Energieversorgungsunternehmen haben gegenueber anderen Unternehmen den Vorteil, dass sie das Verbraucherverhalten dank Netzleitsystemen, Roundsteuerung und neuerdings auch Zaehlerfernablesung kontinuierlich messen. Allerdings fuehren sie diese Daten meist nicht konsequent genug zusammen, um daraus wertvolle Schluesse fuer Vertrieb und Marketing zu ziehen. Eine der wenigen Ausnahmen ist die Unterfraenkische Ueberlandzentrale (UUeZ). Bei der UUeZ laufen die Zaehlwerte von jedem einzelnen Lastprofilzaehler, der in die Anlagen der Sondervertragskunden eingebaut ist, in einem `Cockpit` zusammen. Mit Hilfe einer Data-Warehouse-Loesung der FrankenData GmbH wurde ein ausgekluegeltes Informationssystem realisiert, das langfristige Trends und Optimierungspotentiale sofort

  5. Inquiry relating to modifications of reactor installation in Ikata No. 1 and 2 nuclear power plants of Shikoku Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    Application was made to the Minister of International Trade and Industry for the license relating to the modifications of reactor installation in the Ikata No. 1 and 2 nuclear power plants of the Shikoku Electric Power Company, Inc., on February 13, 1979, from the president of the company. After the safety evaluation was finished by the Ministry of International Trade and Industry, inquiry was conducted to the Atomic Energy Safety Commission (AESC) on June 15, 1979, from the Minister of International Trade and Industry. The investigation and discussion were commenced by the AESC on June 19, 1979. The modifications of the reactor installation are the increase of new fuel storage capacity from about 1/3 to about 2/3 of in-core fuel for No. 1 plant and the modification of driving mechanism from the roller nut type to the magnetic jack type for the control rod cluster for adjusting power distribution in the No. 2 plant. The contents of the safety examination for each item written above are presented. The prevention of criticality is carefully practiced for the new fuel storage by putting fuel assemblies in stainless steel can type racks and locating the fuel assemblies at the proper distance. Relating to the driving mechanism for the control rod cluster adjusting power distribution, the driving speed is not modified and the reliability is kept by carrying out the continuous operation test and the electric power black out test as the demonstration test. The magnetic jack type mechanism has the locking device to prevent reactor tripping at the time of electric power black out, and the cluster is held at the location where the cluster existed at the time of black out. (Nakai, Y.)

  6. CO2 burden and climatic risk. Strategies of action of the German electricity supply companies. 2. rev. ed.

    International Nuclear Information System (INIS)

    1992-01-01

    According to indications of the working group for questions on the climate of the association of German electric utilities (VDEW), energy application of power generation contributes to the German CO 2 -emission with about 30%. A reduction of CO 2 -emissions in electro-economics can be achieved especially with a decrease of the application of fossil energy sources parallel to a better energy utilization (increase of the efficiency, enlargement of cogeneration) and through the expansion of power generation free from CO 2 (nuclear energy, renewable energy sources). (orig.) [de

  7. 78 FR 72567 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-12-03

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company (GE) GE90-110B1 and -115B turbofan engines. This AD was prompted by multiple... turbofan engines with variable bypass valve (VBV) actuator fuel supply tube, part number (P/N) 2165M22P01...

  8. The Electric Company Writers' Notebook.

    Science.gov (United States)

    Children's Television Workshop, New York, NY.

    This handbook outlines the curriculum objectives for the children's television program, "The Electric Company." The first portion of the text delineates strategies for teaching symbol/sound analysis, including units on blends, letter groups, and word structure. A second section addresses strategies for reading for meaning, including…

  9. Electricity supply in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Eden, R; Evans, N

    1986-01-01

    This study is about future needs for electricity in the United Kingdom, the options for meeting these needs, and the issues that affect the choices between options. It examines the implications of the nuclear accident at Chernobyl and the problems that could arise if decisions on new power station construction continue to be delayed following the Sizewell PWR Inquiry. The book reviews the historical development of electricity supply in the UK. Alternative scenarios are outlined for future energy and electricity demand and their implications for future power station construction are deduced. Issues that are discussed include the choice of coal or nuclear power and the related political uncertainties, environmental problems such as acid rain, feasibility and costs of electricity supply options, and the likely effect on future energy import costs of alternative choices for electricity supply.

  10. Inquiry relating to modifications of reactor installation in Genkai No. 1 and 2 nuclear power plants of Kyushu Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    Application was made to the Minister of International Trade and Industry for the license relating to the modifications of reactor installation in the Genkai No. 1 and 2 nuclear power plants, Kyushu Electric Power Company, Inc., on February 27, 1979, from the president of the company. After the safety evaluation was finished by the Ministry of International Trade and Industry, inquiry was conducted to the head of the Atomic Energy Safety Commission (AESC) on June 15, 1979 from the Minister of International Trade and Industry. The investigation and discussion were commenced by the AESC on June 19, 1979. The modifications of the reactor installation are the increase of new fuel storage capacity from about 1/3 to about 2/3 of in-core fuel for each plant, the new establishment of a miscellaneous solid waste incinerator which is common to both plants, and the enlargement of a solid waste storage which is also common to both plants. The contents of the safety examination for each item written above are presented. The prevention of criticality is carefully practiced for the new fuel storage by putting fuel assemblies in stainless steel can type racks and locating the fuel assemblies at the proper distance. The miscellaneous solid waste incinerator building is designed as the B class aseismatic structure and also as the controlled area with adequate shielding and ventilating facilities. The decontamination factor of the incinerator facility is more than 10 5 , and the necessary monitoring system is provided in the building. Concerning the solid waste storage, the additional storage area is about 1600 m 2 , and the storage capacity is about ten years quantity. This building is designed as the B class aseismatic structure. (Nakai, Y.)

  11. Power supply trip control for nuclear reactor

    International Nuclear Information System (INIS)

    Hager, R.E.; Gutman, Jerzy.

    1987-01-01

    A control system for a trip coil in a switchgear mechanism controls the supply of electrical power to a process control device and ensures de-energization of the trip coil shortly after the trip coil is energized. The trip coil is energized not by an independent dc source as in prior art, but from rectified power from a step down transformer supplied from the switchgear output side. The transformer feeds a rectifier which is connected to the trip coil via a trip activation device. The output of the rectifier can be monitored using an optical converter to determine the ability of the control system to activate the trip coil and the condition of the power supplied to the process control device. The control device may be a rod positioner in a pressurised water nuclear reactor. (author)

  12. Nuclear reactor power supply system

    International Nuclear Information System (INIS)

    Cook, B.M.

    1982-01-01

    The redundant signals from the sensor assemblies measuring the process parameters of a nuclear reactor power supply are transmitted each in its turn to a protection system which operates to actuate the protection apparatus for signals indicating off-process conditions. Each sensor assembly includes a number of like sensors measuring the same parameters. The sets of process signals derived from the sensor assemblies are each in its turn transmitted from the protection system to the control system which impresses control signals on the reactor or its components to counteract the tendency for conditions to drift off-normal status requiring operation of the protection system. A parameter signal selector prevents a parameter signal which differs from the other parameter signals of the set by more than twice the allowable variation from passing to the control system. Test signals are periodically impressed by a test unit on a selected pair of a selection unit and control channels. This arrangement eliminates the possibility that a single component failure which may be spurious will cause an inadvertent trip of the reactor during test. (author)

  13. Risk management of power supply in open electricity market

    International Nuclear Information System (INIS)

    Rinta-Runsala, E.; Kiviniemi, J.

    1999-12-01

    The open electricity market has increased the need of risk management in electric utilities. In this publication the concepts of risk assessment and measures mostly concentrating on market risks for power supply companies are reported. An essential past of the risk management includes the electricity derivates and trade

  14. The future of electric power supply

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    In this interview with a prominent expert of the electric power industry, problems of assuring electricity supply, the economics of nuclear electricity generation, the supply structure, and cogeneration are discussed. (UA) [de

  15. Danish electricity supply. Statistik 1999

    International Nuclear Information System (INIS)

    2000-07-01

    The Association of Danish Electric Utilities issues each year the statistical yearbook 'Danish electricity supply'. By means of brief text, figures, and tables a description is given of the electric supply sector. The total electric power consumption in 1999 is almost the same as in 1998. There has been a moderate consumption increase in the households and the service sector whereas the consumption in industry has decreased. 1999 is the first year with actual competition in the power-producing sector. The increased competition from the Scandinavian hydro-electric power plants and the growing number of privately owned wind turbines and other decentralised power plants result in a decline in the power production at the electric utilities of 10% compared to the year 1998. In 1999 electric power from renewable energy sources such as wind, biomass, and waste covers close to 10% of the total Danish power consumption. More than 400 new turbines are installed in 1999 and the total capacity of wind power increases with ca. 20%. The actual energy content of the wind in 1999 was, however, 15% lower than normally which results in a significant reduction of the utilisation of the wind turbine capacity. (ln)

  16. Electricity Self-Generation Costs for Industrial Companies in Cameroon

    Directory of Open Access Journals (Sweden)

    Diboma Benjamin Salomon

    2010-07-01

    Full Text Available Industrial production in developing countries (DC is frequently perturbed by electric energy supply difficulties. To overcome this problem, generators are used in self-generation of energy, but this leads to an increase of electricity-related expenses. This article assesses the impact of electricity self-generation on Cameroonian industrial companies. The model described in this article is based on data collected through a survey of a representative sample of industrial companies and from numerous previous thematic and statistical studies. The results of our analyses show that expenses related to electricity in industrial companies in Cameroon have increased five times due to electricity rationing and untimely power cuts. The article also suggests some solutions to improve the electricity self-generation capacity of industrial companies.

  17. Divide and rule. The economic and legal implications of the proposed ownership unbundling of distribution and supply companies in the Dutch electricity sector

    International Nuclear Information System (INIS)

    Baarsma, B.; Nooij, M. de

    2007-01-01

    In Machiavelli's theory of power, the concept of 'divide and rule' forms the main theme: the ruler has absolute power and to maintain and increase such power all means are justified. When viewed against the background of this theory, the current debate in the Netherlands on the unbundling of energy (electricity, gas) companies can be observed as an example of 'divide and rule', in which the Dutch Minister of Economic Affairs plays a central role. Yet, contrary to Machiavelli in his time, the Dutch government does, in fact, aim principally at the greater welfare of the Dutch people. It is therefore noteworthy that, while important steps in the decision to unbundled have been taken, there is no evidence that the Dutch people will indeed benefit from the envisaged unbundling. (author)

  18. Divide and rule. The economic and legal implications of the proposed ownership unbundling of distribution and supply companies in the Dutch electricity sector

    International Nuclear Information System (INIS)

    Baarsma, Barbara; Nooij, Michiel de; Koster, Weero; Weijden, Cecilia van der

    2007-01-01

    In Machiavelli's theory of power, the concept of 'divide and rule' forms the main theme: the ruler has absolute power and to maintain and increase such power all means are justified. When viewed against the background of this theory, the current debate in the Netherlands on the unbundling of energy (electricity, gas) companies can be observed as an example of 'divide and rule', in which the Dutch Minister of Economic Affairs plays a central role. Yet, contrary to Machiavelli in his time, the Dutch government does, in fact, aim principally at the greater welfare of the Dutch people. It is therefore noteworthy that, while important steps in the decision to unbundled have been taken, there is no evidence that the Dutch people will indeed benefit from the envisaged unbundling

  19. Divide and rule. The economic and legal implications of the proposed ownership unbundling of distribution and supply companies in the Dutch electricity sector

    Energy Technology Data Exchange (ETDEWEB)

    Baarsma, B.; Nooij, M. de [University of Amsterdam (Netherlands). SEO Economic Research; Koster, W.; Weijden, C. van der [Norton Rose Advocaten and Solicitors, Amsterdam (Netherlands)

    2007-03-15

    In Machiavelli's theory of power, the concept of 'divide and rule' forms the main theme: the ruler has absolute power and to maintain and increase such power all means are justified. When viewed against the background of this theory, the current debate in the Netherlands on the unbundling of energy (electricity, gas) companies can be observed as an example of 'divide and rule', in which the Dutch Minister of Economic Affairs plays a central role. Yet, contrary to Machiavelli in his time, the Dutch government does, in fact, aim principally at the greater welfare of the Dutch people. It is therefore noteworthy that, while important steps in the decision to unbundled have been taken, there is no evidence that the Dutch people will indeed benefit from the envisaged unbundling. (author)

  20. Economical electricity supply and utilization

    Energy Technology Data Exchange (ETDEWEB)

    Madsen, K

    1980-05-01

    During the first oil crisis in 1973, hundreds of millions of D-marks have been wasted by medium-sized businesses in the FRG due to avoidable losses and increased electricity costs. Serious attempts towards excluding such losses have to be initiated by an analysis of the individual technical conditions of an enterprise and by consultations 'on site'. Problems relating to an economical electricity supply and utilization in medium-sized industrial enterprises are discussed in this article from the point of view of an industrial consultant being an expert in this field. Practical examples are also given.

  1. A hybrid approach based on ANP, ELECTRE and SIMANP metaheuristic method for outsourcing manufacturing procedures according to supply chain risks - Case study: A medical equipment manufacturer company in Iran

    Directory of Open Access Journals (Sweden)

    Hiwa Farughi

    2017-01-01

    Full Text Available Nowadays enterprises should consider seeking to reduce the supply chain risks as a crucial part of their activities in order to improve their competitiveness in the international context. Choosing the suitable strategy in connection with assigning some parts of the production process to outside the organization is a complex multi-criteria decision making problem and it gets more complicated when supply chain risk factors as the factors to select the strategy as well as dependence and the close ties between these criteria also be considered. In this paper, after the identification of risks in the supply chain of a medical equipment manufacturer company, dependence and ties between criteria in line with choosing the best strategy among existing alternatives has been examined in the form of a combined ANP-ELECTRE method. This combined model is of high performance to give a solution to the problem considered in this paper. But given the complex and time consuming nature of the AHP and ELECTRE, in this study a meta-heuristic algorithm is developed called SIMANP that despite the simplicity of computing and high-speed, is good in the terms of precision and efficiency. The results of comparing SIMANP algorithm and the proposed ANP - ELECTRE method are presented at the end.

  2. Reliability analysis with the simulator S.ESCAF of a very complex sequential system: the electrical power supply system of a nuclear reactor

    International Nuclear Information System (INIS)

    Blot, M.

    1987-06-01

    The reliability analysis of complex sequential systems, in which the order of arrival of the events must be taken into account, can be very difficult, because the use of the classical modelling technique of Markov diagrams leads to an important limitation on the number of components which can be handled. The desk-top apparatus S.ESCAF, which electronically simulates very closely the behaviour of the system being studied, and is very easy to use, even by a non specialist in electronics, allows one to avoid these inconveniences and to enlarge considerably the analysis possibilities. This paper shows the application of the S.ESCAF method to the electrical power supply system of a nuclear reactor. This system requires the simulation of more than forty components with about sixty events such as failure, repair and refusal to start. A comparison of times necessary to perform the analysis by these means and by other methods is described, and the advantages of S.ESCAF are presented

  3. Nuclear science. U.S. electricity needs and DOE's civilian reactor development program

    International Nuclear Information System (INIS)

    England-Joseph, Judy; Allen, Robert E. Jr.; Fitzgerald, Duane; Young, Edward E. Jr.; Leavens, William P.; Bell, Jacqueline

    1990-05-01

    Electricity projections developed by the North American Electric Reliability Council (NERC) appear to be the best available estimates of future U.S. electricity needs. NERC, which represents all segments of the utility industry, forecasts that before 1998 certain regions of the country, particularly in the more heavily populated eastern half of the United States, may experience shortfalls during summer peak demand periods. These forecasts considered the utility companies' plans, as of 1989, to meet electricity needs during the period; these plans include such measures as constructing additional generators and conducting demand management programs. Working closely with the nuclear industry, DOE is supporting the development of several reactor technologies to ensure that nuclear power remains a viable electricity supply option. In fiscal year 1990, DOE's Civilian Reactor Development Program was funded at $253 million. DOE is using these funds to support industry-led efforts to develop light water reactors (LWR), advanced liquid-metal reactors (LMR), and modular high-temperature gas-cooled reactors (MHTGR) that are safe, environmentally acceptable, and economically competitive. The utility company officials we spoke with, all of whom were in the Southeast, generally supported DOE's efforts in developing these technologies. However, most of the officials do not plan to purchase nuclear reactors until after 2000 because of the high costs of constructing nuclear reactors and current public opposition to nuclear power

  4. Iron crud supply device to reactor coolant

    International Nuclear Information System (INIS)

    Baba, Takao.

    1993-01-01

    In a device for supplying iron cruds into reactor coolants in a BWR type power plant, a system in which feed water containing iron cruds is supplied to the reactor coolants after once passing through an ion exchange resin is disposed. As a result, iron cruds having characteristics similar with those of naturally occurring iron cruds in the plant are obtained and they react with ionic radioactivity, to form composite oxides. Then, iron cruds having high performance of being secured to the surface of a fuel cladding tube can be supplied to the reactor coolants, thereby enabling to greatly reduce the density of reactor water ionic radioactivity. In its turn, dose rate on the surface of pipelines can be reduced, thereby enabling to reduce operators' radiation exposure dose in the plant. Further, contamination of a condensate desalting device due to iron cruds can be prevented, and further, the density of the iron cruds supplied can easily be controlled. (N.H.)

  5. Small nuclear power reactor emergency electric power supply system reliability comparative analysis; Analise da confiabilidade do sistema de suprimento de energia eletrica de emergencia de um reator nuclear de pequeno porte

    Energy Technology Data Exchange (ETDEWEB)

    Bonfietti, Gerson

    2003-07-01

    This work presents an analysis of the reliability of the emergency power supply system, of a small size nuclear power reactor. Three different configurations are investigated and their reliability analyzed. The fault tree method is used as the main tool of analysis. The work includes a bibliographic review of emergency diesel generator reliability and a discussion of the design requirements applicable to emergency electrical systems. The influence of common cause failure influences is considered using the beta factor model. The operator action is considered using human failure probabilities. A parametric analysis shows the strong dependence between the reactor safety and the loss of offsite electric power supply. It is also shown that common cause failures can be a major contributor to the system reliability. (author)

  6. SUPPLY CHAIN MANAGEMENT AS AN ELEMENT OF COMPANY STRATEGY

    OpenAIRE

    SEBASTIAN KOT; DANUTA PLUTA; IWONA STASIAK; WIOLETTA STRUZIK

    2014-01-01

    : The process of supply chain management is a huge challenge for managers of many companies. In today's market situation more and more often it is the effective supply of products at minimum cost and a guarantee of an adequate level of customer service which determine the competitiveness of organizations. As a result, companies implement strategies for supply chain management. The constantly increasing role of logistics and supply chain management results, among others, from the fact that bot...

  7. Integrated resource planning in Danish electricity supply

    International Nuclear Information System (INIS)

    1994-01-01

    Integrated Resource Planning in Danish Electricity Supply is a development project run by a cooperation of Danish electric power companies. It takes environmental issues, such as energy conservation, into consideration in addition to the European Union's proposal for a directive on the introduction of competition within the common energy market. The concept of integrated resource planning is described as a tool that can be used for a total cost minimization of the activities on the supply side and the demand side, this concept is further elucidated. It is explained that there must be an economic balance between the efforts on both sides and that this will ensure a total cost minimization. Preconditions, related for example to socio-economics, and procedures (step-by-step planning), functional barriers, a definition of roles and international influence and dialogue are also discussed. Satisfaction is expressed for this method of integrated resource planning, yet uncertainty as to the future structure of the free electricity market implies a cautious implementation. (AB)

  8. Choice of models and data availability for the efficiency analysis of the Dutch distribution and supply companies in the electricity sector. Background document of 'Guidelines for price cap regulation in the Dutch electricity sector'

    International Nuclear Information System (INIS)

    Burns, P.; Huggins, M.; Riechmann, C.; Weyman-Jones, T.

    2000-02-01

    July 1999 The Netherlands Electricity Regulatory Service (DtE) published an Information and Consultation Document on the title subject. By means of price cap regulation tariffs are determined such that businesses are stimulated continuously to organize their total processes and operation as efficient as possible. In the consultation document a large number of questions with respect to the future organization and planning of the system of economic regulation of the electricity sector in the Netherlands can be found. Many reactions and answers were received, compiled and analyzed. The results are presented in the main report, which forms the framework for the DtE to shape the economic regulation of the Dutch electricity sector. In this background document attention is paid to the most appropriate models by means of which the efficiency of the electricity companies in the Netherlands can be analyzed

  9. Diagnosis of electric equipment at the Dalat Nuclear Research Reactor

    International Nuclear Information System (INIS)

    Nguyen Truong Sinh

    1999-01-01

    The Dalat Nuclear Research Reactor (DNRR) is a pool type of its kind in the world: Soviet-designed core and control system harmoniously integrated into the left-over infrastructure of the former American-made TRIGA MARK II reactor, which includes the reactor tank and shielding, graphite reflector, beam tubes and thermal column. The reactor is mainly used for radioisotope and radiopharmaceutical production, elemental analysis using neutron activation techniques, neutron beam exploitation, silicon doping, and reactor physics experimentation. For safe operation of the reactor maintenance work has been carried out for the reactor control and instrumentation, reactor cooling, ventilation, radiomonitoring, mechanical, normal electric supply systems as well as emergency electric diesel generators and the water treatment station. Technical management of the reactor includes periodical maintenance as required by technical specifications, training, re-training and control of knowledge for reactor staff. During recent years, periodic preventive maintenance (PPM) has been carried out for the electric machines of the technological systems. (author)

  10. Development of datamining software for the city water supply company

    Science.gov (United States)

    Orlinskaya, O. G.; Boiko, E. V.

    2018-05-01

    The article considers issues of datamining software development for city water supply enterprises. Main stages of OLAP and datamining systems development are proposed. The system will allow water supply companies analyse accumulated data. Accordingly, improving the quality of data analysis would improve the manageability of the company and help to make the right managerial decisions by executives of various levels.

  11. Sale of electric energy: the case of Electric Power Company of Santa Catarina State (CELESC)

    International Nuclear Information System (INIS)

    Aurich, D.S.

    1990-01-01

    An electric power system assuring the electric supply to the investor client was developed by CELESC, linking the sale resources to one generation construction. It was related the cost of enlargement work from Pery plant, with the participation of Manville Forest Products in the investments. The economic aspects of this contract are presented, including the supply assure, the costs and the advantage each company will receive. (C.G.C.)

  12. Power supply with nuclear reactor

    International Nuclear Information System (INIS)

    Cook, B.M.

    1982-01-01

    Each parameter of the processes of a nuclear reactor and components operatively associated therewith is monitored by a set of four like sensors. A trip system normally operates on a 'two out of four' configuration; i.e., to trip the reactor it is necessary that at least two sensors of a set sense an off-normal parameter. This assumes that all sensors are in normal operating condition. However, when a sensor is in test or is subject to maintenance or is defective or disabled, the 'two out of four' configuration would be reduced to a 'one out of three' configuration because the affected sensor is taken out of service. This would expose the system to the possibility that a single sensor failure, which may be spurious, will cause a trip of the reactor. To prevent this, it is necessary that the affected sensor be bypassed. If only one sensor is bypassed, the system operates on a 'two out of three' configuration. With two sensors bypassed, the sensing of an off-normal parameter by a third sensor trips the reactor

  13. Emergency water supply facility for nuclear reactor

    International Nuclear Information System (INIS)

    Karasawa, Toru

    1998-01-01

    Water is stored previously in an equipment storage pit disposed on an operator floor of a reactor building instead of a condensate storage vessel. Upon occurrence of an emergency, water is supplied from the equipment storage pit by way of a sucking pipeline to a pump of a high pressure reactor core water injection circuit and a pump of a reactor-isolation cooling circuit to supply water to a reactor. The equipment storage pit is arranged in a building so that the depth thereof is determined to keep the required amount of water by storing water at a level lower than the lower end of a pool gate during normal operation. Water is also supplied from the equipment storage pit by way of a supply pipeline to a spent fuel storage pool on the operation floor of the reactor building. Namely, water is supplied to the spent fuel storage pool by a pump of a fuel pool cooling and cleaning circuit. This can eliminate a suppression pool cleaning circuit. (I.N.)

  14. Hawaiian Electric Company Demand Response Roadmap Project

    Energy Technology Data Exchange (ETDEWEB)

    Levy, Roger [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Kiliccote, Sila [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2013-01-12

    The objective of this project was to develop a “roadmap” to guide the Hawaiian Electric Company (HECO) demand response (DR) planning and implementation in support of the Hawaii Clean Energy Initiative (HCEI) 70% clean energy goal by 2030.

  15. Supply chain management as the company engine in automotive manufacturing

    OpenAIRE

    Ferriols Martínez, Francisco José; Mula, Josefa; Díaz-Madroñero Boluda, Francisco Manuel

    2013-01-01

    ©2013 International Federation of Automatic Control (IFAC). Originally published in IFAC-PapersOnLine (www.ifac-papersonline.net) The objective of this paper is to define how to create a supply chain management (SCM) organizational structure with roles and responsibilities in a multinational company with a big part of the supply chain inside of the company. SCM means having under control the complete supply chain to decide the global optimal instead of summing up the optimal of each node i...

  16. Nozzle for electric dispersion reactor

    Science.gov (United States)

    Sisson, W.G.; Basaran, O.A.; Harris, M.T.

    1995-11-07

    A nozzle for an electric dispersion reactor includes two concentric electrodes, the inner one of the two delivering disperse phase fluid into a continuous phase fluid. A potential difference generated by a voltage source creates a dispersing electric field at the end of the inner electrode. 4 figs.

  17. Meeting Ontario's electricity supply challenge

    International Nuclear Information System (INIS)

    Johnson, A.

    2004-01-01

    This paper presents a comparison between nuclear generation and other existing power generation, with particular reference to the natural gas industry. The aim of the paper was to present a rationale for an extensive nuclear restart in the near future in Ontario. An energy forecast was provided, generating capacity requirements were examined, with particular reference to requirements beyond conservation and renewable energy supplies. The cost effectiveness of nuclear rehabilitation was compared to combined cycle gas turbines (CCGT) in terms of capital and non-fuel costs. Future prospects of gas prices were discussed, as well as the possibilities of demand outstripping supply. CCGT costs were compared to nuclear rehabilitation in terms of overall electricity prices, including capital, non-fuel operating costs and fuel costs. Steps towards making the nuclear option a reality included a sustainable market environment; clear policy framework; a balanced energy mix; long term price certainty; and clear regulatory requirements. In was concluded that in order to regenerate its potential, the nuclear industry must demonstrate world class project management; fixed scope; fixed supplier prices; program commitment; guarantees; and realistic future production estimates. It was also concluded that nuclear restart and life extension was an extremely attractive option for consumers, offering long term stable competitive power, with fuel diversity and future reserves as well as zero greenhouse gas emissions and an optimization and use of existing facilities. Challenges in creating the right climate for nuclear rehabilitation were the difficulties in making the nuclear option attractive to investors as well as developing correct estimation of project times, costs, and scopes and allocation of project risks. tabs., figs

  18. Experience of electric power conservation in COELBA (Bahia Electric Company)

    International Nuclear Information System (INIS)

    Bastos, A.C.F.

    1990-01-01

    The electric power crisis of Brazilian north-east in 1987 imposes the Bahia Electric Company-COELBA to management a electric power conservation. The institutional, organizational and operational aspects are presented, including the tariff system, the market, the consumption and the relation with public. (author)

  19. Electricity supply of Switzerland. Development and structure

    International Nuclear Information System (INIS)

    Mutzner, J.

    1995-01-01

    An overview of the history of the Swiss power supply since the founding of the Swiss Electricity Works Association in the year 1985 is provided. Power supply, requirements, linkage and exchange with other countries are dealt with. Further themes are the organizational structures, tariffs, power supply and energy policies, as well as national and international connections. 87 figs., 40 refs

  20. Supply of enriched uranium for research reactors

    International Nuclear Information System (INIS)

    Mueller, Hans; Laucht, Juergen

    1996-01-01

    Since the RERTR meeting in 1990 at Newport/USA, NUKEM recommended that the research reactor community agree upon a worldwide unified technical specification for low enriched uranium (LEU) and high enriched uranium (HEU) since there existed numerous specifications both from suppliers/fabricators and research reactors. The target recommended by NUKEM is to arrive at a worldwide unified standard specification in order to facilitate supplies of LEU and HEU to fabricators for fabrication of research reactor fuel elements. In our paper presented at the RERTR meeting at Paris in September 1995, we pointed out that LEU and HEU supplied by the U.S. Department of Energy (DOE) in the past was never 'virgin' material, i.e., it was mixed with reprocessed uranium. Our recommendation was to include this fact in the proposed unified specification. Since the RERTR meeting in 1995 progress on a unified standard specification has been made and we would like to provide more specific information about that in this paper. Furthermore, we will deal with the question whether there is a secure supply of LEU for converted research reactors. We list current and potential suppliers of LEU, noting however, that the DOE has for a number of years been unable to supply any LEU due to production problems. The future availability of LEU of U.S. origin is, of course, essential for those research reactor operators which have converted their reactors from HEU to LEU and which are intending to return spent fuel of U.S. origin to the U.S.A. (author)

  1. Electric power supply in China. Pt. 1

    International Nuclear Information System (INIS)

    Chen Heng

    1987-01-01

    Professor Chen, visiting professor at the RWTH Aachen, gave several lectures dealing with his country, the electric power supply in China and with special research activities of Chinese scientists. This article is based on two of his lectures, and will be published in two parts, the first of which provides a brief description of China, an overview on electric power supply, and a brief description of the large power plants and large electrical subsystems. The second part will deal with operation planning, extension planning as well as with research and development in the field of electric energy supply. (orig.) [de

  2. TU electric reactor model verification

    International Nuclear Information System (INIS)

    Willingham, C.E.; Killgore, M.R.

    1989-01-01

    Power reactor benchmark calculations using the code package CASMO-3/SIMULATE-3 have been performed for six cycles of Prairie Island Unit 1. The reload fuel designs for the selected cycles include gadolinia as a burnable absorber, natural uranium axial blankets, and increased water-to-fuel ratio. The calculated results for both low-power physics tests (boron end points, control rod worths, and isothermal temperature coefficients) and full-power operation (power distributions and boron letdown) are compared to measured plant data. These comparisons show that the TU Electric reactor physics models accurately predict important physics parameters for power reactors

  3. Logistics and supply chain effectiveness measure areas in lng companies

    Directory of Open Access Journals (Sweden)

    2010-09-01

    Full Text Available The article describes the issues of logistics and supply chain measures in companies. It considers different management systems in the area of production, which evolved from isolated production activities to business connected systems. There are performed three case studies - three examples of systems proposed and implemented in the LNG industry: I-MAC, ICIMS and PMS. Data gained from these systems are the basis to create effectiveness measures for LNG companies and LNG supply chains.

  4. Bottleneck management in the German and European electricity supply

    International Nuclear Information System (INIS)

    Koenig, Carsten

    2013-01-01

    This publication describes how bottlenecks in the German and European electricity supply pose a danger to the realization of the European internal market in electricity, the transition to electricity production from renewable resources and to the safeguarding of grid availability and security of supply. Bottlenecks at cross-border interconnectors between member states of the European Union are hampering cross-border trade in electricity, posing an impediment to EU-wide competition among electricity production and electricity trading companies. Grid bottlenecks at cross-border interconnectors isolate national markets from one another, with the result that it is not always possible in the European Union to have the most competitive power plant produce electricity. This amounts to a loss of welfare compared with what it would be in the case of an electricity supply without bottlenecks. Furthermore, bottlenecks make it impossible for green electricity that would be eligible for promotion for reasons of climate and environmental protection to be transmitted unimpeded from the most suitable site to the consumer regions. Thus the transmission of electricity produced from wind power in Northern Germany to the industrial centres in Southern Germany is impeded by bottlenecks along the north-south lines of the national transmission network. Today some of the German electricity supply networks already have to be operated near the limits of their capacity, especially during high wind episodes. This poses a growing danger to network availability and security of supply. Since the installation, expansion and conversion of electricity supply networks in Germany and other member states of the European Union is no longer progressing at the required speed, growing importance attaches to the management of bottlenecks. The goal of bottleneck management is to resolve conflicts over network use such as can occur in overload situations with as little discrimination and as little

  5. Memorial 1997 - ENDESA (Chilean Electricity Company)

    International Nuclear Information System (INIS)

    1998-01-01

    This report provides a comprehensive survey, in depth assessment of the activities overview of ENDESA, Chilean Electricity Company, highlighting economical information and including historical and technical aspects. Economics is its focal point, but other relevant data are shown, like technical data on hydroelectric and thermoelectric power plants. Main activities developed by ENDESA are described, such in Chile as in the foreign. Data on power generation, transmission and transport are also presented and an economical balance of each colligated company are done and analysed

  6. Summary of the electric power supply program for fiscal 1981

    International Nuclear Information System (INIS)

    Shimada, Minoru

    1981-01-01

    The plans of electric power supply for fiscal 1981 (from April, 1981, to March, 1982) by the power companies were formulated and submitted to the Ministry of International Trade and Industry. Along with the current up trend of economic activities, the demands of electric power will be on the increase. A summer peak of power consumption may rise all the more due to the increase in room-cooling units. On the other hand, the problem of petroleum is unsettled. Under the situation, the principal considerations behind the formulation of the plans are the effective utilization of other energy resources than oil and the suppression of oil-burning power generation, the economical usage of all power generation facilities and stabilized demand and supply, and the promotion of wide-area operation. The situation in fiscal 1981, power demands, power source facilities demand and supply balance, and the interchange of power among power companies are described. (J.P.N.)

  7. Evaluation of efficiency in Japan electric power companies

    International Nuclear Information System (INIS)

    Ghaderi, F.; Muyajima, M.

    2001-01-01

    Achieving energy efficiency also must consider supply efficiency, how much energy it takes to generate electricity and transmit it to the end user. system efficiency reflects the loss of energy during the processes of generation, transmission and distribution of electricity. Of the millions of tons of coal that are burned to produce heat in generation of electricity every year, only one third is converted into electricity.The electric power plant immediately uses 5 to 10 percent of that energy for use in the plant. Around another 10 percent of this energy is consumed in the transmission and distribution of electric energy to end users. Overall,more that 70 percent of the energy used to produce and deliver electricity never gets to the end user. The costs of this wasted energy are reflected in the customer's electricity bill. Furthermore, once delivered, users of electricity are subjected to more h idden c osts the demand charge which reflects the rate at which consumers draw energy from the power plant during a particular time of day, are also affected by the time of year. This additional charge c n be dramatic. For example, the cost for using electric air conditioning at the w rong t ime of the day , are also affected by the time of year. This additional charge can be dramatic. For example, the cost for using electric air conditioning at the wrong time of the day could be as much as 25 to 40 percent higher than what a facility normally pays for electricity during off-peak times. Minimizing the costs of operations, therefor, is a must for all electric companies. In the other hand utility rates, such as the cost of electricity, are a necessary element of operating in all enterprises.In some industries the payment over electricity make a large percentage of their total expenses, but that doesn't mean that every effort should not be made to reduce their impact on the bottom line, it should be considered that a very small change in operating procedure can change

  8. A Time Efficient Supply Chain Model for an Apparel Company

    OpenAIRE

    Gustafson, Annika; Ng, Sze Lit (Philip); von Schmiesing-Korff, Alice

    2005-01-01

    In most market places today competition has become stronger, not only between single companies but between networks of linked partners, known as supply chains. Consumer demands are changing more often and companies have to react quickly when new trends and consumer requirements appear, thus the competition becomes more time-sensitive. This is especially true in the apparel fashion industry because time is a crucial factor and can make the difference between the success or failure of a company...

  9. Analysis on the Electric Power Supply - Demand Measures of Japan in 2011 Summer after Earthquake and Tsunami

    International Nuclear Information System (INIS)

    Lee, Y. E.; Chang, H. S.

    2011-01-01

    Only 12 of 54 nuclear reactors are in operation as of September 1, 2011 in the wake of the earthquake and tsunami in Japan. The share of nuclear power in the nation's installation capacity fell to about 14% in August from about 30% before March 11, 2011. Government or many of research institutes estimated that the power supply system in Japan would fall to the minus reserve margin, if the nuclear power stations could not be restarted as scheduled. However, the current situation of power supply system in Japan is less severe than expected before, because the power companies and public have engaged in various diligent efforts to boost supply capacity or reduce demand in response to the electric power crisis. This paper aims to analyze the how much Japan electric power supply system depends on the nuclear power, what kinds of countermeasures of electric power supply-demand are taken by electricity companies in summer time to avoid the blackouts and why the saving electricity in Japan could be possible unlike Korea. Insights from this paper would be taken into account in the long term energy planning, even though the further study in depth should be followed

  10. MODERN ELECTRIC CARS OF TESLA MOTORS COMPANY

    OpenAIRE

    O. F. Vynakov; E. V. Savolova; A. I. Skrynnyk

    2016-01-01

    This overview article shows the advantages of a modern electric car as compared with internal combustion cars by the example of the electric vehicles of Tesla Motors Company. It (в смысле- статья) describes the history of this firm, provides technical and tactical characteristics of three modifications of electric vehicles produced by Tesla Motors. Modern electric cars are not less powerful than cars with combustion engines both in speed and acceleration amount. They are reliable, economical ...

  11. MODERN ELECTRIC CARS OF TESLA MOTORS COMPANY

    Directory of Open Access Journals (Sweden)

    O. F. Vynakov

    2016-08-01

    Full Text Available This overview article shows the advantages of a modern electric car as compared with internal combustion cars by the example of the electric vehicles of Tesla Motors Company. It (в смысле- статья describes the history of this firm, provides technical and tactical characteristics of three modifications of electric vehicles produced by Tesla Motors. Modern electric cars are not less powerful than cars with combustion engines both in speed and acceleration amount. They are reliable, economical and safe in operation. With every year the maximum range of an electric car is increasing and its battery charging time is decreasing.Solving the problem of environmental safety, the governments of most countries are trying to encourage people to switch to electric cars by creating subsidy programs, lending and abolition of taxation. Therefore, the advent of an electric vehicle in all major cities of the world is inevitable.

  12. Supply Chain Management in Zhendong Pharmaceutical Company

    OpenAIRE

    Li, Yan

    2011-01-01

    Medicines are special commodity related to people’s lives and health, therefore, pharmaceutical distribution is an industry affecting the national economy and the people's livelihood. With health care reform, changeable pharmaceutical policy and fiercely increasing competition in the medical industry, pharmaceutical distribution companies should improve their level of logistics operations and reduce overall logistics management costs in order to gain a leading position in the competition. In ...

  13. NRC Information No. 91-48: False certificates of conformance provided by Westinghouse Electric Supply Company for refurbished commercial-grade circuit breakers

    International Nuclear Information System (INIS)

    Rossi, C.E.

    1992-01-01

    In April 1988, WESCO of Albany, New York, supplied 250 MCCBs (molded-case circuit breakers) to Spectrum of Schenectady, New York. Spectrum dedicated these commercial-grade items on the basis of independent testing and the certificates of conformance (CoCs) it received from WESCO. During receipt inspection testing, Peach Bottom determined that the MCCBs were not new and had been refurbished. The NRC conducted an inspection and investigation of Spectrum and WESCO in 1988 and 1989. During these efforts, the NRC identified that the MCCBs provided to Peach Bottom were reconditioned and not new equipment as specified in the purchase order. Although the purchase order from Spectrum to WESCO specifically required new equipment and CoCs, WESCO purchased the MCCBs from a subvendor which dealt mainly in reconditioned equipment and provided these reconditioned MCCBs to Spectrum with falsified CoCs that certified that they were new equipment. In addition, the investigation identified that WESCO ordered Westinghouse labels from the subvendor in order to label the shipping boxes that lacked labels. Spectrum performed the dedication inspection and testing to demonstrate the adequacy of the MCCBs from WESCO. However, the validity of this testing depended on the MCCBs being new equipment. Spectrum's failure to verify the accuracy or the validity of the CoCs resulted in Spectrum accepting fraudulent CoCs and providing reconditioned (as opposed to new) MCCBs to Peach Bottom

  14. Gas supplies of interstate natural gas pipeline companies, 1991

    International Nuclear Information System (INIS)

    1992-01-01

    This publication provides information on the total reserves, production, and deliverability capabilities of the 64 interstate pipeline companies required to file the Federal Energy Regulatory Commission (FERC) Form 15, ''Interstate Pipeline's Annual Report of Gas Supply.'' Data reported on this form are not considered to be confidential. This publication is the 29th in a series of annual reports on the total gas supplies of interstate pipeline companies since the inception of individual company reports to the Federal Power Commission (FPC) in 1964 for report year 1963

  15. The fast reactor and energy supply

    International Nuclear Information System (INIS)

    1979-01-01

    The progress made with fast reactor development in many countries is summarised showing that the aim is to provide to the nation concerned an ability to instal fast reactor power stations at the end of this century or early in the next one. Accepting the importance of fast reactors as a potential independent source of energy, problems concerning economics, industrial capability, technical factors, public acceptibility and in particular plutonium management, are discussed. It is concluded that although fast reactors have reached a comparatively advanced stage of development, a number of factors make it likely that their introduction for electricity generation will be a gradual process. Nevertheless it is necessary to complete demonstration and development phases in good time. (U.K.)

  16. Risk analysis of critical infrastructures emphasizing electricity supply and interdependencies

    International Nuclear Information System (INIS)

    Kjølle, G.H.; Utne, I.B.; Gjerde, O.

    2012-01-01

    Failures in critical infrastructures can cause major damage to society. Wide-area interruptions (blackouts) in the electricity supply system have severe impacts on societal critical functions and other critical infrastructures, but there is no agreed-upon framework on how to analyze and predict the reliability of electricity supply. Thus, there is a need for an approach to cross-sector risk analyses, which facilitates risk analysis of outages in the electricity supply system and enables investigation of cascading failures and consequences in other infrastructures. This paper presents such an approach, which includes contingency analysis (power flow) and reliability analysis of power systems, as well as use of a cascade diagram for investigating interdependencies. A case study was carried out together with the Emergency Preparedness Group in the city of Oslo, Norway and the network company Hafslund Nett. The case study results highlight the need for cross-sector analyses by showing that the total estimated societal costs are substantially higher when cascading effects and consequences to other infrastructures are taken into account compared to only considering the costs of electricity interruptions as seen by the network company. The approach is a promising starting point for cross-sector risk analysis of electricity supply interruptions and consequences for dependent infrastructures.

  17. Supply of enriched uranium for research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, H. [NUKEM GmbH, Alzenau (Germany)

    1997-08-01

    Since the RERTR-meeting In Newport/USA in 1990 the author delivered a series of papers in connection with the fuel cycle for research reactors dealing with its front-end. In these papers the author underlined the need for unified specifications for enriched uranium metal suitable for the production of fuel elements and made proposals with regard to the re-use of in Europe reprocessed highly enriched uranium. With regard to the fuel cycle of research reactors the research reactor community was since 1989 more concentrating on the problems of its back-end since the USA stopped the acceptance of spent research reactor fuel on December 31, 1988. Now, since it is apparent that these back-end problem have been solved by AEA`s ability to reprocess and the preparedness of the USA to again accept physically spent research reactor fuel the author is focusing with this paper again on the front-end of the fuel cycle on the question whether there is at all a safe supply of low and high enriched uranium for research reactors in the future.

  18. Supply of enriched uranium for research reactors

    International Nuclear Information System (INIS)

    Mueller, H.

    1997-01-01

    Since the RERTR-meeting In Newport/USA in 1990 the author delivered a series of papers in connection with the fuel cycle for research reactors dealing with its front-end. In these papers the author underlined the need for unified specifications for enriched uranium metal suitable for the production of fuel elements and made proposals with regard to the re-use of in Europe reprocessed highly enriched uranium. With regard to the fuel cycle of research reactors the research reactor community was since 1989 more concentrating on the problems of its back-end since the USA stopped the acceptance of spent research reactor fuel on December 31, 1988. Now, since it is apparent that these back-end problem have been solved by AEA's ability to reprocess and the preparedness of the USA to again accept physically spent research reactor fuel the author is focusing with this paper again on the front-end of the fuel cycle on the question whether there is at all a safe supply of low and high enriched uranium for research reactors in the future

  19. Safety of power transformers, power supplies, reactors and similar products - Part 1: General requirements and tests

    CERN Document Server

    International Electrotechnical Commission. Geneva

    1998-01-01

    This International Standard deals with safety aspects of power transformers, power supplies, reactors and similar products such as electrical, thermal and mechanical safety. This standard covers the following types of dry-type transformers, power supplies, including switch mode power supplies, and reactors, the windings of which may be encapsulated or non-encapsulated. It has the status of a group safety publication in accordance with IEC Guide 104.

  20. Planning games for the electricity supply industry

    International Nuclear Information System (INIS)

    Weber, K.

    1977-01-01

    The author shows the main differences between the electricity supply planning game for the Bernische Kraftwerke AG (PEW-1) and that for the Rheinisch-Westfaelische Elektrizitaetswerke AG (PEW-2). (orig.) [de

  1. ENERGY STAR Certified Electric Vehicle Supply Equipment

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 1.0 ENERGY STAR Program Requirements for Electric Vehicle Supply Equipment that are...

  2. General conditions for electric power supply

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    If it is uncertain whether future power bills will be paid fully, it is admissible to take an action claiming a declaration which states that the electricity rate payment boycotter has no right to non-payment nor a right to withhold payment towards the electricity supply utility, and that the electricity supply utility has the right to stop energy supply because of reduced electricity rate payments effected and/or announced, and to denounce the contract without observing any term of notice. If the electricity buyer reduces a power bill to be paid without any legal grounds, the electricity supply utility has the right to stop power supplies and to denounce the power supply contract without observing any term of notice. The freedom of thought and the freedom of opinion must not be expressed by reducing power bills to be paid. Basic rights discontinue to be effective as soon as a contract or law is broken. A weighing of protected interests is not effected if the exercise of a basic law is unlawful. (orig./HP) [de

  3. Energy demand and supply prompts record results for Canadian companies

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    The Canadian energy industry has shown consistent growth in recent years. This trend is expected to continue due high energy prices resulting from concerns regarding energy supply and increased demand for energy. The 2005 annual survey by Pricewaterhouse Coopers states that Canadian energy sectors have seen average revenues grow by 12.4 per cent from $934 million to $1.05 billion for conventional companies and by 30.5 per cent from $285 million to $372 million for income trusts. The survey provides a summary of Canada's energy industry, including crude oil, natural gas, oil and gas services, oil sands and electricity. The financial and operating information of the top 100 Canadian public oil and gas companies is also summarized, along with 31 oil and gas income trusts. The survey found that crude oil prices were influenced by price volatility and record highs in 2004. Price volatility was due to global political tensions, increased demand from China, India and the United States and lower crude supplies in the United States. Production of Canadian crude, including conventional, synthetic crude, heavy crude, natural gas and natural gas from liquids continued to increase in 2004. A strong pricing environment will likely continue, according to industry expectations, due to political instability in the Middle East and OPEC's tight crude supply strategy. Strong pricing is expected to enhance natural gas economics and promote increased capital investment and production. In 2004, the oil and gas service industry drilled a record 21,593 wells in Western Canada and a record 28,630 drilling permits will be issued. In 2004, there was also a strong demand for field services and improvements in many manufacturing firms. Production from Canadian oil sands in 2004 was over 1 million barrels per day. An estimated 174 billion barrels of oil lie within the oil sands, making Canada the second largest country in terms of global proven crude oil reserves. Several oil sands projects have

  4. Reactors for nuclear electric propulsion

    Energy Technology Data Exchange (ETDEWEB)

    Buden, D.; Angelo, J.A. Jr.

    1981-01-01

    Propulsion is the key to space exploitation and power is the key to propulsion. This paper examines the role of nuclear fission reactors as the primary power source for high specific impulse electric propulsion systems for space missions of the 1980s and 1990s. Particular mission applications include transfer to and a reusable orbital transfer vehicle from low-Earth orbit to geosynchronous orbit, outer planet exploration and reconnaissance missions, and as a versatile space tug supporting lunar resource development. Nuclear electric propulsion is examined as an indispensable component in space activities of the next two decades.

  5. Reactors for nuclear electric propulsion

    International Nuclear Information System (INIS)

    Buden, D.; Angelo, J.A. Jr.

    1981-01-01

    Propulsion is the key to space exploitation and power is the key to propulsion. This paper examines the role of nuclear fission reactors as the primary power source for high specific impulse electric propulsion systems for space missions of the 1980s and 1990s. Particular mission applications include transfer to and a reusable orbital transfer vehicle from low-Earth orbit to geosynchronous orbit, outer planet exploration and reconnaissance missions, and as a versatile space tug supporting lunar resource development. Nuclear electric propulsion is examined as an indispensable component in space activities of the next two decades

  6. Electricity supply in South Africa

    International Nuclear Information System (INIS)

    De Villiers, J.W.L.

    1986-01-01

    ESCOM, at present providing for some 95% of the electricity demand, has grown from a relatively small undertaking with a total installed capacity of less than 30 MW(e) in 1922 and a capital expenditure of R15 million during the period 1923-1930, to a gigantic undertaking with a fixed-asset value of nearly R16 billion in 1984, a staff complement of more than 60 000 and an income of over R3 billion p.a. With an estimated capital-expansion programme of between 4 and 5 billion rand p.a., ESCOM is the largest single borrower on the local capital market and it exercises a strong influence on the economy. The fact that ESCOM has been able to keep electricity prices competitive, despite inflationary costs, by the efficient utilization of resources such as coal and water, has served as a driving force for economic and industrial development and has made it possible for South Africa to establish energy-intensive metallurgical industries during the seventies. Estimates of future electricity demand based on economic considerations and population growth, lead to a sustained electricity-demand growth rate in the region of 5% p.a. At this rate of growth the known extractable coal reserves will be depleted by the year 2035, and some alternative means of generating electricity will have to be utilized timeously. At present nuclear energy is the only proven alternative to coal. Depending on certain assumptions of fuel costs, escalation and interest rates, it can be shown that nuclear electricity costs, calculated over the lifetime of a nuclear power station at the coast, could be competitive with a coal-fired power station in the interior

  7. Gas supplies of interstate natural gas pipeline companies 1990

    International Nuclear Information System (INIS)

    1992-01-01

    This publication provides information on the interstate pipeline companies' supply of natural gas in the United States during calendar year 1990, for use by the Federal Energy Regulatory Commission for regulatory purposes. It also provides information to other Government agencies, the natural gas industry, as well as policy makers, analysts, and consumers interested in current levels of interstate supplies of natural gas and trends over recent years

  8. Improving the supply chain agility of a fashion accessories company

    OpenAIRE

    Rosenlund, Kristian

    2015-01-01

    This thesis aims to improve the supply chain agility of a case company that is engaged in the design, development and worldwide marketing and selling of fashion accessories and design services. This thesis explores agility in context of supply chain management and in fashion industry where the typical challenges are that demand is highly volatile and hard to predict, the number of products per sales season is large and products have a fairly short life-cycles. In this study, the research ...

  9. Electric utility companies and geothermal power

    Science.gov (United States)

    Pivirotto, D. S.

    1976-01-01

    The requirements of the electric utility industry as the primary potential market for geothermal energy are analyzed, based on a series of structured interviews with utility companies and financial institution executives. The interviews were designed to determine what information and technologies would be required before utilities would make investment decisions in favor of geothermal energy, the time frame in which the information and technologies would have to be available, and the influence of the governmental politics. The paper describes the geothermal resources, electric utility industry, its structure, the forces influencing utility companies, and their relationship to geothermal energy. A strategy for federal stimulation of utility investment in geothermal energy is suggested. Possibilities are discussed for stimulating utility investment through financial incentives, amelioration of institutional barriers, and technological improvements.

  10. An optimization model for natural gas supply portfolios of a power generation company

    International Nuclear Information System (INIS)

    Jirutitijaroen, Panida; Kim, Sujin; Kittithreerapronchai, Oran; Prina, José

    2013-01-01

    Highlights: ► An optimization model for daily operation of a natural gas-fired generation company is proposed. ► The model considers uncertainties in electricity price and natural gas price. ► The model is formulated to capture the hedging decisions by the company. ► The solution yields quantities of natural gas, generating schedule and purchasing quantities of electricity. ► Higher profit can be achieved by adapting inventory and production to the actual spot prices of natural gas and electricity. - Abstract: This paper considers a deregulated electricity market environment where a natural gas-fired generation company can engage in different types of contracts to manage its natural gas supply as well as trade on the electricity market. If the contracts are properly designed, they can protect the company from fluctuations in electricity price and demand, at some cost to the company’s expected profit. This reduction in profit can be mitigated by trading on the natural gas and electricity spot markets, but this trading activity may also sometimes result in losses. A stochastic programming model is formulated to capture the hedging decisions made by the company, as well as the interactions between the natural gas and electricity markets. The benefits offered by this approach for profit maximization in a variety of business scenarios, such as the case where the company can hold some amount of gas in storage are studied and presented. It is found that the stochastic model enables the company to optimize the electricity generation schedule and the natural gas consumption, including spot price transactions and gas storage management. Several managerial insights into the natural gas market, natural gas storage, and distribution profit are given

  11. Electric power. The boom of continuous supply

    International Nuclear Information System (INIS)

    Anon.

    2001-01-01

    The increasing needs in electric supply that exist in computer industry and Internet or more classical industry and tertiary sector have boosted the non-interruptible power supply market and decentralized generation groups. One can imagine the development of mini networks exploited by new types operators, progressive renunciation of the diesel engine for the profit of gas turbine and soon fuel cell and new opportunities for the cogeneration. (N.C.)

  12. 78 FR 56594 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-09-13

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company (GE) GE90-76B, -85B, -90B, -94B, -110B1, and - 115B turbofan engines. This AD was...) Applicability This AD applies to General Electric Company (GE): (1) GE90-76B, -85B, -90B, and -94B turbofan...

  13. 78 FR 72552 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-12-03

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company model GEnx-2B67 and GEnx-2B67B turbofan engines. This AD was prompted by the... certain serial number General Electric Company (GE) model GEnx-2B67 and GEnx-2B67B turbofan engines. The...

  14. 76 FR 24465 - Pacific Gas and Electric Company

    Science.gov (United States)

    2011-05-02

    ... Electric Company Notice of Application Tendered for Filing With the Commission and Establishing Procedural... Gas and Electric Company. e. Name of Project: Drum-Spaulding Project. f. Location: The west slope of..., Pacific Gas and Electric Company, P.O. Box 770000, San Francisco, CA 94177-0001, (415) 973-4481, or e-mail...

  15. Extension planning for electrical energy supply systems

    International Nuclear Information System (INIS)

    Bieselt, R.

    1975-01-01

    In the future as well as in the past, and in particular in the next decade a considerable increase in electrical energy demand can be expected. To satisfy this demand in a reliable and sufficient manner will force the utilities to invest large sums of money for the operation and the extension of power generation and distribution plants. The size of these investments justifies the search for more and more comprehensive and at the same time more detailed planning methods. With the help of system analysis a planning model for the electricity supply industry of a major supply area will be designed. (orig./RW) [de

  16. The high temperature reactor - an important tool in meeting the challenge of world energy supply

    International Nuclear Information System (INIS)

    Knizia, K.; Schwarz, D.

    1988-01-01

    A growing and, in its majority, poor mankind will need increasing amounts of energy at moderate prices. At the same time, ecological stresses on our environment, on the forests of the Third World (firewood crisis), and on the climate must be limited. The High Temperature Reactor (HTR) is a well-suited answer to all challenges, as it can supply electricity safely and economically, be built close to process steam and district heat consumers, procure more hydrocarbons from coal relative to a given release of CO 2 , and has the potential of splitting water with high efficiency. At times of affluent fossile fuels, however, and not yet apparent need to restrict their use for reasons of climate, individual companies cannot bear the development and introduction of HTRs all by themselves. Therefore governments are called upon for support. (orig.)

  17. power system reliability in supplying nuclear reactors

    International Nuclear Information System (INIS)

    Gad, M.M.M.

    2007-01-01

    this thesis presents a simple technique for deducing minimal cut set (MCS) from the defined minimal path set (MPS) of generic distribution system and this technique have been used to evaluate the basic reliability indices of Egypt's second research reactor (ETRR-2) electrical distribution network. the alternative system configurations are then studied to evaluate their impact on service reliability. the proposed MCS approach considers both sustained and temporary outage. the temporary outage constitutes an important parameter in characterizing the system reliability indices for critical load point in distribution system. it is also consider the power quality impact on the reliability indices

  18. Fire safety requirements for electrical cables towards nuclear reactor safety

    International Nuclear Information System (INIS)

    Raju, M.R.

    2002-01-01

    Full text: Electrical power supply forms a very important part of any nuclear reactor. Power supplies have been categorized in to class I, II, III and IV from reliability point. The safety related equipment are provided with highly reliable power supply to achieve the safety of very high order. Vast network of cables in a nuclear reactor are grouped and segregated to ensure availability of power to at least one group under all anticipated occurrences. Since fire can result in failures leading to unavailability of power caused by common cause, both passive and active fire protection methods are adopted in addition to fire detection system. The paper describes the requirement for passive fire protection to electrical cables viz. fire barrier and fire breaks. The paper gives an account of the tests required to standardize the products. Fire safety implementation for cables in research reactors is described

  19. Dual-purpose light water reactor supplying heat for desalination

    International Nuclear Information System (INIS)

    Waplington, G.; Fichtner, H.

    1978-01-01

    The technical as well as the economic aspects of using a large commercial light water reactor for the production of both electricity and potable water have been examined. For the basis of the study, the multistage flash distillation process was selected, in conjunction with a reactor rated at not less than 2100 MW (thermal). Combined use of a condensing and a back-pressure turbine (the latter matched to distillation plant steam requirements) represents a convenient method for supplying process heat. Overall costs can be fairly allocated to the two products using the ''power credit'' method. A sample economic evaluation indicates highly favorable water costs as compared with more conventional distillation schemes based on fossil fuel

  20. Electricity supply in the insolvency of a customer; Stromlieferung in der Insolvenz des Kunden

    Energy Technology Data Exchange (ETDEWEB)

    Brickwedde, Werner [Clifford Chance, Duesseldorf (Germany)

    2012-09-15

    Within the insolvency of a electricity customer, there is no fully comprehensive protection of an energy supply company from the failure with accounts from a power supply contract. In the insolvency proceeding under consideration, the energy supply company always has a good position when the preliminary insolvency administrator is 'strong'. It happens regularly that the preliminary insolvency administrator is 'weak'. In this case the risk of failure of the energy supply company is enhanced. The energy supply company may react on this risk by adjustment to payments in advance or by discontinuing the supply as a second step. In accordance with the industrial customers energy supply companies also have the option to protect themselves from insolvency-related solution clauses against the risk of failure. In the opened insolvency proceeding the risk is reduced further because claims from the supply of electricity in any case mass liabilities and payment obligations on mass liabilities are not contestable. If the insolvency administrator does not pay, the energy supply company may stop the energy supply.

  1. Electricity supplies in a French nuclear power station

    International Nuclear Information System (INIS)

    2011-01-01

    As the operation of a nuclear power station requires a power supply system enabling this operation as well as the installation safety, this document describes how such systems are designed in the different French nuclear power stations to meet the requirements during a normal operation (when the station produces electricity) or when it is stopped, but also to ensure power supply to equipment ensuring safety functions during an incident or an accident occurring on the installation. More precisely, these safety functions are provided by two independent systems in the French nuclear power stations. Their operation is briefly described. Two different types of nuclear reactors are addressed: pressurised water reactors (PWR) of second generation, EPR (or PWR of third generation)

  2. SUPPLY CHAIN MANAGEMENT: SOME INSIGHTS FROM INDIAN MANUFACTURING COMPANIES

    Directory of Open Access Journals (Sweden)

    Sanjay Jharkharia

    2004-01-01

    Full Text Available Some issues such as inventory management, IT-enablement of supply chains, and buyer-supplier relationships are at the core of supply chain research. Some other issues such as postponement, top management commitment, and disparities in trading partners' capability influence these core issues. Some hypotheses have been proposed to assess such influences. Through a questionnaire-based survey for Indian manufacturing companies, these hypotheses have been tested. It is observed from this research that information sharing and top management commitment have important roles towards the effectiveness of a supply chain. The findings also establish relationships among many important issues of supply chain management. The paper ends with the discussion and implications of this research.

  3. Metering apparatus and tariffs for electricity supply

    International Nuclear Information System (INIS)

    1990-01-01

    Conference papers presented cover system economies and tariff structure with papers on pricing of electricity and new metering technologies. Other topics reviewed include metering apparatus design, electronic metering apparatus and solid phase metering technology. Meter data retrieval, bulk supply metering, test equipment and maintenance, and legal requirements and standards are discussed. (author)

  4. Nanotechnological solutions for Nigeria's electricity supply problem ...

    African Journals Online (AJOL)

    ... for every roof. The energy generated from the sun would be stored in inverters or other energy storage facilities like supercapacitors and superconductors during the day and would be useable during the night. Keywords: Nanotechnology, nano photovoltaic cells, Electricity Generation and Supply, Hybrid Energy Building ...

  5. Electricity demand and supply to 2020

    International Nuclear Information System (INIS)

    Bertel, E.

    1991-01-01

    This paper will attempt to make projections of energy and electricity demand, and the possible share of nuclear generation in global supply, up to 2020. This horizon has been chosen because the long lead times prevailing in the energy sector imply long-term planning, even though the degree of uncertainty is quite large when looking several decades ahead. Electricity demand, as well as primary energy consumption, depends on many technical and economic factors, obviously including demography. Using statistical data for past decades, it is possible to quantify by econometric methods and the links between energy and electricity consumption and economic parameters. The models defined may then be used to make projections of future electricity consumption. The share of nuclear electricity in primary energy supply can be estimated by taking into account the various constraints and lead times limiting the deployment of nuclear generating capacity, and the shares of other energy sources in electricity generation in each country or region. It should be emphasized that the scenarios presented below are illustrative, and are not forecasts of future energy and electricity demand. Because of the method adopted and the assumptions made, the scenarios reflect a 'conventional wisdom'. However, they do incorporate concerns for environmental protection and improvements regarding energy efficiency. (author)

  6. Defence in depth for electric power supplies in Indian nuclear power plants

    International Nuclear Information System (INIS)

    Gupta, S.K.; Srivasista, K.; Solanki, R.B.

    2009-01-01

    The purpose of electric power supply system in a nuclear power plant is to supply and distribute reliable electric power to safety related systems and systems important to safety in various forms, arrangements and combinations of redundancy and diversity in order to perform safety functions required during operational states and design basis events (DBE) such as shutting down the reactor, maintaining the reactor in safe shutdown state, containment isolation and reactor core cooling preventing significant release of radioactive material to the environment. Hence the design basis of electric power supply systems includes identification of DBE that require power supplies, adequacy of redundancy and diversity, environmental conditions to which electric equipment are qualified, identification of loads requiring interrupted and uninterrupted power supplies, time sequence in which emergency loads are to be supplied in case of interruption, provisions for maintaining and testing, consideration for minimum duration capability of emergency power supplies during station blackout etc. Based on operation experience, results of probability safety assessment and certain weaknesses noticed in defence in depth of electric power supply systems, several continuous design improvements have been made in Indian nuclear power plants during operating phase and life extension. Instituting various tests during initial commissioning, subsequent operation and life extension has ensured high standards of performance of electric power supplies. Some of these aspects are highlighted in this paper

  7. Supply of enriched uranium for research reactors

    International Nuclear Information System (INIS)

    Mueller, H.

    2004-01-01

    Since the RERTR-Meeting in Newport/USA in 1990 recommended in several papers to the research reactor community to agree upon a worldwide unified technical specification for low enriched uranium (LEU) and high enriched uranium (HEU) in order to facilitate supplies of LEU and HEU to fabricators for acceptance and for fabrication of fresh fuel elements. This target for unified and simplified specification has only been partially reached due to different interests of the fabricators because they want to receive the uranium as pure as possible. As a result of various investigations, however, it became clear that both LEU and HEU received from the United States since the late fifties had different qualities which we have to deal with today due to the availability of stocks. We are now one step forward to know more precisely the properties of LEU and HEU we have received in the past. This uranium was never virgin and we have to cope with this situation. Therefore in my present paper I have concentrated on the documentation of analytical work performed on samples of LEU and HEU received in the past. I propose furthermore a frame of unified specifications for so-called virgin LEU and HEU including uranium from a Zero-experiment. In addition I am giving a recommendation for specifications of LEU obtained by blending of reprocessed HEU. Finally I am touching the question of secure supplies of fresh LEU. (author)

  8. Planning Mechanisms for Regional Electric Power Supply System Development

    Directory of Open Access Journals (Sweden)

    Evgeniy Anatolyevich Malyshev

    2015-12-01

    Full Text Available Key problems of the regional electric power supply systems are examined. These problems result from a lack of regulated interaction mechanisms for uniting the different entities’ resources aimed at the realization of investment activities. One of the main problems of the power supply industry is physical and moral aging of both generating and networking equipment. In the article, the necessity of management system formation to control the development of power sector has been proved. The deficiencies of the modern investment procedure in power companies are described. The absence of continuity between the regional and local strategic planning documents and investment planning of a power company has been found out. The possibility to develop a new mechanism for attracting investment has been proposed. The regulation of joint activities to implement the development program for the regional power supply industry has been proposed. The management system to develop the Russian power industry has been proposed. The comparative analysis of generating capacity development mechanisms has been carried out, such as capacity supply agreement (CSA, investment support mechanism (ISM, and long-term power market (LPM. The interaction procedure of the planning of the power supply infrastructure development has been described. The mechanism connecting the state sectoral and regional planning and corporate planning of power supply infrastructure development has been proposed. The regional aspects of industrial policy and its legislative support have been considered. To successfully implement the public-private-partnership (PPP projects, it is necessary to create the effective PPP model within the federal and regional legislation framework; to develop the financial model providing the recoverability of investments; to provide a mutually beneficial cooperation between executive bodies and private investors. The possibility to apply the PPP mechanism for regional

  9. Proposal to negotiate an amendment to an existing contract for the supply of four additional low-noise Thyristor-Controlled Reactor coils for a new Static VAR Compensator on the 18 kV electrical network on the Meyrin site

    CERN Document Server

    2017-01-01

    Proposal to negotiate an amendment to an existing contract for the supply of four additional low-noise Thyristor-Controlled Reactor coils for a new Static VAR Compensator on the 18 kV electrical network on the Meyrin site

  10. Technical results French electricity supply industry 2007

    International Nuclear Information System (INIS)

    2008-01-01

    This booklet presents provisional results for the French electricity supply industry (excluding overseas territories). Data come from measures made by RTE, completed by various actors of the power system and by estimations made by RTE. Data from 2001 to 2005 were updated in order to take into account additional information given by different actors of the electrical energy sector. Contents: 1 - General results in France (National consumption, Physical exchanges with foreign countries, Net generation, Energy consumed, Electrical energy balance in France, Energy generated); 2 - Consumption in France (Annual consumption, Weekly consumption in 2007, Temperature, Daily consumption); 3 - Electrical energy flows (End consumption by type of customer, Physical flows of electrical energy, Physical exchanges with foreign countries); 4 - Trend of the electricity market (Cross-border contractual exchanges, Balance Responsible Entities, Sales of generation capacity auction, Energy sales on Powernext Day-Ahead TM , Balancing mechanism); 5 - Generation in France (Installed capacity and generation by type of facility, thermal, hydro, other renewable energy sources); 6 - Equipment on the electricity network (Equipment in operation as of 31 December); 7 - Power system operation (Equivalent time of interruption, Long outage frequency, Short outage frequency, Number of annual Significant System Events by severity); 8 - Access to the RTE network; 9 - Development over the past 15 years (Facilities in France at year-end, Annual results in France); 10 - International comparisons (Energy data of UCTE countries in 2006); 11 - Terminology

  11. Security of supply in Competitive Electricity Markets. Conference proceedings

    International Nuclear Information System (INIS)

    2005-06-01

    A stable and reliable electricity supply is a fundamental factor in our modern economy and many people think that the deregulated market is a threat to this - or at least, they think that there is a need for a new type of regulation. Others believe that the threat to security of supply comes from short sighted politicians rather than from competitive markets. Regulation in order to increase security of supply is a threat to well functioning competitive markets - not the other way around. To give an overview of different regulatory models and to discuss each model's particular pros and cons, ELFORSK (Swedish Electrical Utilities RandD Company) on behalf of the Swedish electricity industry, the national grid company Svenska Kraftnaet and the Regulating Authority has arranged this two-day Conference. This conference once again gathers people from many different parts of the world to exchange ideas and experiences from their respective area of operations. Our belief is that people from the industry, the governments as well as from the academic world will find these two days a useful opportunity to build new relationships and gain new insights into the topics covered. There are three main topics for the Conference: Experiences from Different Markets; The Value of Security of Supply; Ongoing research projects. The members of the Conference Committee are impressed by the quality of the papers presented at this Conference and we believe that this is a source of knowledge that will influence decisions makers in many countries. (11 papers presented at the conference have been indexed separately. Powerpoint presentations have not been indexed but are available from the Market Design homrpage)

  12. Companies' contribution to sustainability through global supply chains.

    Science.gov (United States)

    Thorlakson, Tannis; de Zegher, Joann F; Lambin, Eric F

    2018-02-27

    Global supply chains play a critical role in many of the most pressing environmental stresses and social struggles identified by the United Nations' Sustainable Development Goals (SDGs). Responding to calls from the global community, companies are adopting a variety of voluntary practices to improve the environmental and/or social management of their suppliers' activities. We develop a global survey of 449 publicly listed companies in the food, textile, and wood-products sectors with annual reports in English to provide insight into how the private sector contributes to advancing the SDGs via such sustainable-sourcing practices. We find that while 52% of companies use at least one sustainable-sourcing practice, these practices are limited in scope; 71% relates to only one or a few input materials and 60.5% apply to only first-tier suppliers. We also find that sustainable-sourcing practices typically address a small subset of the sustainability challenges laid out by the SDGs, primarily focusing on labor rights and compliance with national laws. Consistent with existing hypotheses, companies that face consumer and civil society pressure are associated with a significantly higher probability of adopting sustainable-sourcing practices. Our findings highlight the opportunities and limitations of corporate sustainable-sourcing practices in addressing the myriad sustainability challenges facing our world today. Copyright © 2018 the Author(s). Published by PNAS.

  13. Appreciation analysis for power supply companies; Wertsteigerungsanalyse fuer Energieversorgungsunternehmen

    Energy Technology Data Exchange (ETDEWEB)

    Muche, T. [Hochschule Zittau/Goerlitz (Germany)

    2007-08-15

    In view of the probable future consolidation in the energy economy with municipal undertakings increasingly becoming subject to takeovers and participations issues of shareholder value are a matter of growing interest for power supply companies. Amongst other advantages, having a high shareholder value guards against unwanted takeovers. However, it is not enough for companies merely to know their shareholder value; they must rather have their entire operative and strategic planning and control instruments geared to it. This forms the background to a pilot project at Goerlitz/Zittau University which was dedicated to an analysis of the shareholder value of municipal undertakings on the basis of year-end financial and capital market data.

  14. INFORMATION FLOW IN SUPPLY CHAIN MANAGEMENT WITH AN EXAMPLE OF WASTE MANAGEMENT COMPANY

    OpenAIRE

    Joanna Nowakowska-Grunt; Janusz Grabara

    2007-01-01

    The paper presents information flow process in management of supply chains. Authors notices information flows as a driving element of the global supply chain. Authors points also on the logistics aspects in supply chain of waste management company

  15. Transaction Costs in Global Supply Chains of Manufacturing Companies

    Directory of Open Access Journals (Sweden)

    Philipp Bremen

    2010-02-01

    Full Text Available Outsourcing has advanced to an important measure that is applied broadly in operations management. Nowadays, suppliers of manufacturing companies do not only provide direct material like raw material and operational supplements but offer components and advanced modules incurring many value-adding stages. Whereas in the past companies built up local supplier networks, they recently tend to search for global sources. However, not all companies reach their expectations towards the success of global sourcing projects. Important reasons for relocating manufacturing capacities back to local suppliers or in- house manufacturing are costs for unexpected coordination activities, limited flexibility and declined or fluctuating quality. The theory of Transaction Cost Economics postulates that transaction costs of the types information, communication and coordination determine the governance structure of a supply chain, i.e. market, hybrid or firm. The objective of this paper is to analyze the cause-and-effect chain of inter-firm transaction costs concerning global sourcing. The resulting qualitative model is based on explorative multiple-case study.

  16. Deregulation of Electricity Supply Industry in Oman

    Directory of Open Access Journals (Sweden)

    Hamed S. Al-Maghderi

    2002-06-01

    Full Text Available This paper examines the opportunities available and the conditions needed for the deregulation of the Electricity Supply Industry (ESI, with particular reference to the Sultanate of Oman. The paper highlights the general issues of regulation required to encourage competition in the ESI.  After that, the discussion focuses on regulation methods in the privatized ESI by describing the regulators control through price caps setting for regulatees, the conduct regulation process, the rate of return regulation setting, and the spot market (the pool contract. Finally, the prospects of restructuring and privatizing the ESI in the Sultanate of Oman are examined by reviewing the current structure of the industry and government objectives in deregulation of the electricity sector as well as the regulation framework.

  17. Electricity supply opportunities -- The Mexican door opens

    International Nuclear Information System (INIS)

    Holland, H.W.

    1993-01-01

    Anyone who assumes that the Mexican market for electrical capacity is just a matter of selling equipment and services is in for a shock. The astute neighbor to the south is exploring privatization in the power sector with a style and flair that is uniquely Mexican. While free market-market forces have, to some extent, already transformed the manner in which new generating capacity is added in the US, a Mexico equivalent will not develop over night. Mexico is no place for the faint of heart. You have to play hard in order to win against competition almost equivalent to that of the US market and have the staying power to be around long enough to reap the rewards. This work presents the author's views concerning the manner in which competition has been introduced within the electricity supply market of the neighbor to the south

  18. TU Electric reactor physics model verification: Power reactor benchmark

    International Nuclear Information System (INIS)

    Willingham, C.E.; Killgore, M.R.

    1988-01-01

    Power reactor benchmark calculations using the advanced code package CASMO-3/SIMULATE-3 have been performed for six cycles of Prairie Island Unit 1. The reload fuel designs for the selected cycles included gadolinia as a burnable absorber, natural uranium axial blankets and increased water-to-fuel ratio. The calculated results for both startup reactor physics tests (boron endpoints, control rod worths, and isothermal temperature coefficients) and full power depletion results were compared to measured plant data. These comparisons show that the TU Electric reactor physics models accurately predict important measured parameters for power reactors

  19. Advanced Carbothermal Electric Reactor, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — ORBITEC proposes to develop the Advanced Carbothermal Electric (ACE) reactor to efficiently extract oxygen from lunar regolith. Unlike state-of-the-art carbothermal...

  20. 77 FR 4650 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-01-31

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... General Electric Company (GE) CF6-45 and CF6-50 series turbofan engines with certain low-pressure turbine... Compliance We estimate that this AD will affect 387 CF6-45 and CF6-50 series turbofan engines installed on...

  1. 78 FR 19983 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-04-03

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... Electric Company (GE) CF34-8C and CF34-8E turbofan engines with certain part numbers (P/N) of operability...-8E6, and CF34-8E6A1 turbofan engines, with an operability bleed valve (OBV) part number (P/N...

  2. 78 FR 76045 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-12-16

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... (AD) for General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines with certain high... turbofan engines with high pressure compressor (HPC) rotor stage 2-5 spools, part numbers (P/Ns) 351-103...

  3. 78 FR 38195 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-06-26

    ... Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT... all General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines. This emergency AD was.... owners and operators of these GE90-110B1 and GE90-115B turbofan engines. This action was prompted by...

  4. 78 FR 50320 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-08-19

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... Electric Company (GE) model GEnx-2B67B turbofan engines with booster anti-ice (BAI) air duct, part number...-2B67 turbofan engine be removed from the Applicability section of this AD. The commenters noted that...

  5. 77 FR 3088 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-01-23

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... Electric Company (GE) CF34-10E series turbofan engines. This AD was prompted by a report of heavy wear... turbofan engines installed on airplanes of U.S. registry. We also estimate that it will take about 8 work...

  6. The financial and accounting implications of the privatization of the regional electricity companies in the UK

    International Nuclear Information System (INIS)

    Thomson, L.

    1993-01-01

    This paper reviews some of the financial and accounting implications of the privatization of the electricity distribution and supply sector in England and Wales, specifically the transformation of the Electricity Area Boards into the 12 Regional Electricity Companies (RECs). It considers the factors influencing the setting of post-privatization price control factors; the capital restructuring of the RECs; the valuation placed by the Secretary of State for Energy on each company at flotation, and market reaction to this as shown in subsequent changes in share price; and changes in the information provided in the RECs' accounts over the privatization period. (Author)

  7. Creation of reactor's reliable system of emergency energy supply

    International Nuclear Information System (INIS)

    Batyrbekov, G.A.; Brovkin, A.Yu.; Petukhov, V.K.; Chekushin, A.I.; Chernyaev, V.P.; Yagotinets, N.A.

    1998-01-01

    System of reliable power supply of the WWR-K reactor complex is described, which completely provides safety operation of reactor equipment in the case of total voltage loss from external power transmission lines as well as under destruction of accumulation batteries by earthquake more than 6 balls. Switching on in operation of diesel-generators and system of constant current supply from accumulator batteries is occurred automatically under cessation of voltage supply from centralized power system. Reliable reactor dampening in case it work on capacity has been ensured. Reactor cooling under its emergency shutdown during both the partial or the total loss of coolant in first counter has been carried out. Under full coolant loss the system of emergency reactor cooling has been switched on in operation

  8. Pathways for the North European electricity supply

    International Nuclear Information System (INIS)

    Odenberger, M.; Unger, T.; Johnsson, F.

    2009-01-01

    This paper investigates the development of the electricity-supply systems in Northern Europe (Germany, UK, Denmark, Finland, Sweden and Norway) until the year 2050. The focus is on the response to an assumed common stringent CO 2 -reduction target and on the role of carbon capture and storage technologies (CCS). Special emphasis is put on turn-over in capital stock, timing of investments and the infrastructural implications of large-scale introduction of CCS. The analysis is carried out through scenario analysis with the aid of a techno-economic model, in which a case including CCS is compared to a case excluding this option. The phase out of the present capital stock (power plants) is included from the Chalmers energy infrastructure databases, which gives information on present and planned power plants down to block level for plants exceeding 10 MW net electric power. Assuming technical lifetimes for these plants yield residual capacities in each year, here referred to as the phase-out pattern. CCS technologies are assumed to become commercially available in 2020. The age structure of the power plants indicate that full turn-over in capital stock will take several decades with the present generation capacities accounting for around 50% of generated electricity in 2020. The results show that CO 2 emission reductions of 20% and 60% by the years 2020 and 2050, respectively, relative to 1990, can be met at a marginal cost of abatement of about 25-40 Euro /ton CO 2 over the period studied if CCS is included as an option from 2020. At the same time the marginal cost of generating electricity lies in the range 45-60 Euro /MWh. Excluding CCS raises the marginal cost of abatement with about 10 Euro /ton CO 2 , whereas the marginal cost of electricity generation increases with roughly 5-10 Euro /MWh. The CO 2 target by the year 2020 is met by implementation of renewable electricity and fuel shifting from coal to gas. After 2020 CCS technologies constitute an attractive way

  9. Reactor auxiliary cooling facility and coolant supplying method therefor

    Energy Technology Data Exchange (ETDEWEB)

    Ando, Koji; Kinoshita, Shoichiro

    1996-06-07

    A reactor auxiliary cooling facility of the present invention comprises a coolant recycling line for recycling coolants by way of a reactor auxiliary coolant pump and a cooling load, a gravitational surge tank for supplying coolants to the coolant recycling line and a supplemental water supplying line for supplying a supply the supplemental water to the tank. Then, a pressurization-type supply water surge tank is disposed for operating the coolant recycling line upon performing an initial system performance test in parallel with the gravitational surge tank. With such a constitution, the period of time required from the start of the installation of reactor auxiliary cooling facilities to the completion of the system performance test can be shortened at a reduced cost without enlarging the scale of the facility. (T.M.)

  10. Reactor auxiliary cooling facility and coolant supplying method therefor

    International Nuclear Information System (INIS)

    Ando, Koji; Kinoshita, Shoichiro.

    1996-01-01

    A reactor auxiliary cooling facility of the present invention comprises a coolant recycling line for recycling coolants by way of a reactor auxiliary coolant pump and a cooling load, a gravitational surge tank for supplying coolants to the coolant recycling line and a supplemental water supplying line for supplying a supply the supplemental water to the tank. Then, a pressurization-type supply water surge tank is disposed for operating the coolant recycling line upon performing an initial system performance test in parallel with the gravitational surge tank. With such a constitution, the period of time required from the start of the installation of reactor auxiliary cooling facilities to the completion of the system performance test can be shortened at a reduced cost without enlarging the scale of the facility. (T.M.)

  11. Industrial companies' demand for electricity. Evidence from a micropanel

    International Nuclear Information System (INIS)

    Bjoerner, T.B.; Togeby, M.; Jensen, H.H.

    2001-01-01

    The paper presents a micro-econometric analysis of industrial companies' demand for electricity. Previous studies on electricity consumption in the industrial sector have relied on aggregate data or cross-section observations. Here we present an econometric study on electricity demand based on a panel of 2949 Danish companies followed from 1983 to 1996. It is found that estimators of electricity demand that take account of the panel structure (fixed effect models) yield considerably lower price and production elasticities compared to estimators that do not (like cross-section models). It is also investigated how various company characteristics like size, type of industrial sub-sector and electricity intensity in production influence price and production elasticities. It appears that companies with a high electricity intensity also have a high own-price elasticity

  12. 78 FR 72877 - Arkansas Electric Corporation v. Oklahoma Gas and Electric Company; Notice of Complaint

    Science.gov (United States)

    2013-12-04

    ... Electric Corporation v. Oklahoma Gas and Electric Company; Notice of Complaint Take notice that on November... Commission (Commission), 18 CFR 385.206, Arkansas Electric Corporation (Complainant) filed a formal complaint against Oklahoma Gas and Electric Company (Respondents), alleging that the Respondent's Production Formula...

  13. Impact of Deficient Electricity Supply on the Operations of Small Scale Businesses in North East Nigeria

    Directory of Open Access Journals (Sweden)

    Ahmed Ado

    2015-03-01

    Full Text Available Electricity supply in Nigeria is often erratic. Consumers of electricity (residential, commercial and industrial consumers suffer untold hardships as the State Owned Enterprise; the Power Holding Company of Nigeria (PHCN has been unable to supply reliable power. This is despite massive injections of funds by the Federal Government into the operations of the company over recent years. The failure has significantly impacted negatively on the operations of the business sector especially the small scale subsector that operates with little capital and are thus in most cases unable to afford a back-up facility to ensure un-interrupted power supply for their operations. The study examined the impact of deficient electric power supply on the operations of small scale businesses operating in north east of Nigeria. From the population of small scale businesses, a sample was selected through the use of stratified random sampling to ensure the effective representation of the population of small scale businesses in north east Nigeria. Results from data analysis indicates the severity of electricity supply outages and the costs imposed by power supply outages on the operation of this class of businesses in the region. The paper therefore recommends the need for policy attention towards revitalizing the electricity sector of Nigeria for enhanced supply of electricity to the national economy. When this is achieved, the small business sub-sector will be in a position to effectively lead in the drive towards industrializing the Nigerian economy.

  14. System Description of the Electrical Power Supply System for the ATLAS Integral Test Loop

    International Nuclear Information System (INIS)

    Moon, S. K.; Park, J. K.; Kim, Y. S.; Song, C. H.; Baek, W. P.

    2007-02-01

    An integral effect test loop for pressurized water reactors (PWRs), the ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation), is constructed by Thermal-Hydraulics Safety Research Team in Korea Atomic Energy Research Institute (KAERI). The ATLAS facility has been designed to have the length scale of 1/2 and area scale of 1/144 compared with the reference plant, APR1400. This report describes the design and technical specifications of the electrical power supply system which supplies the electrical powers to core heater rods, other heaters, various pumps and other systems. The electrical power supply system had acquired the final approval on the operation from the Korea Electrical Safety Corporation. During performance tests for the operation and control, the electrical power supply system showed completely acceptable operation and control performance

  15. Electric Power Supply Chain Management Addressing Climate Change

    DEFF Research Database (Denmark)

    Wang, Xiao-Hui; Cong, Ronggang

    2012-01-01

    Supply chain management played a critical role in the electric power industrial chain optimization. The purpose of this paper was to review a sample of the literature relating to supply chain management and its possible applications in electricity power system, especially in the context of climate...... change. The study compared the difference between electric power supply chain management and traditional supply chain management. Furthermore, some possible research topics are addressed. The aim of this paper was to promote the application of supply chain management in the China electricity sector...

  16. User's instructions for ORCENT II: a digital computer program for the analysis of steam turbine cycles supplied by light-water-cooled reactors

    International Nuclear Information System (INIS)

    Fuller, L.C.

    1979-02-01

    The ORCENT-II digital computer program will perform calculations at valves-wide-open design conditions, maximum guaranteed rating conditions, and an approximation of part-load conditions for steam turbine cycles supplied with throttle steam characteristic of contemporary light-water reactors. Turbine performance calculations are based on a method published by the General Electric Company. Output includes all information normally shown on a turbine-cycle heat balance diagram. The program is written in FORTRAN IV for the IBM System 360 digital computers at the Oak Ridge National Laboratory

  17. User's instructions for ORCENT II: a digital computer program for the analysis of steam turbine cycles supplied by light-water-cooled reactors

    Energy Technology Data Exchange (ETDEWEB)

    Fuller, L.C.

    1979-02-01

    The ORCENT-II digital computer program will perform calculations at valves-wide-open design conditions, maximum guaranteed rating conditions, and an approximation of part-load conditions for steam turbine cycles supplied with throttle steam characteristic of contemporary light-water reactors. Turbine performance calculations are based on a method published by the General Electric Company. Output includes all information normally shown on a turbine-cycle heat balance diagram. The program is written in FORTRAN IV for the IBM System 360 digital computers at the Oak Ridge National Laboratory.

  18. Design requirement for electrical system of an advanced research reactor

    International Nuclear Information System (INIS)

    Jung, Hoan Sung; Kim, H. K.; Kim, Y. K.; Wu, J. S.; Ryu, J. S.

    2004-12-01

    An advanced research reactor is being designed since 2002 and the conceptual design has been completed this year for the several types of core. Also the fuel was designed for the potential cores. But the process system, the I and C system, and the electrical system design are under pre-conceptual stage. The conceptual design for those systems will be developed in the next year. Design requirements for the electrical system set up to develop conceptual design. The same goals as reactor design - enhance safety, reliability, economy, were applied for the development of the requirements. Also the experience of HANARO design and operation was based on. The design requirements for the power distribution, standby power supply, and raceway system will be used for the conceptual design of electrical system

  19. Design requirement for electrical system of an advanced research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Hoan Sung; Kim, H. K.; Kim, Y. K.; Wu, J. S.; Ryu, J. S

    2004-12-01

    An advanced research reactor is being designed since 2002 and the conceptual design has been completed this year for the several types of core. Also the fuel was designed for the potential cores. But the process system, the I and C system, and the electrical system design are under pre-conceptual stage. The conceptual design for those systems will be developed in the next year. Design requirements for the electrical system set up to develop conceptual design. The same goals as reactor design - enhance safety, reliability, economy, were applied for the development of the requirements. Also the experience of HANARO design and operation was based on. The design requirements for the power distribution, standby power supply, and raceway system will be used for the conceptual design of electrical system.

  20. Device for controlling water supply to nuclear reactor

    International Nuclear Information System (INIS)

    Iwasaki, Toshio.

    1974-01-01

    Object: To smoothly control automatic water supply for realizing stable operation of a nuclear reactor by providing a flow rate limiting signal selection circuit and a preferential circuit in a water supply control device for a nuclear reactor wherein the speed of a recirculation pump may be changed in two-steps. Structure: Opening angle signals for a water supply regulating valve are controlled by a nuclear reactor water level signal, a vapor flow rate signal and a supplied water flow rate signal through an adder and an adjuster in response to a predetermined water level setting signal. When the water in the reactor is maintained at a predetermined level, a selection circuit receives a water pump condition signal for selecting one of the signals from a supplied water rate limiting signal generator generating signals for indicating whether one or two water supply pumps are operated. A low value preferential circuit passes the lower of the values generated from the selection circuit and the adder. The selection circuit receives a recirculation pump condition signal and selects either one of the signals from the supplied water flow rate limiting signal generator operated at high speed or low speed. A high value preferential circuit passes the higher value

  1. Electric Energy Consumption of Multi Purpose Reactor GA. Siwabessy During Reactor Operation

    International Nuclear Information System (INIS)

    Koes Indrakoesoema

    2012-01-01

    Electrical power supply of Reactor Center Multi Purpose obtained from PT PLN to 3030 kVA power contracts. Distribution to existing loads in PRSG divided into 3 (three) lines, each of which is supplied through a transformer BHT01, BHT02 and BHT03, each transformer have capacity of 1600 kVA. During reactor operation, only 2 lines that serve loads, each line serve 2 primary pump motor and 2 secondary pump motor. Electrical power for 24 hours for measurement BHT01, the average is 288 kW, for BHT02 is 641 kW and BHT03 is 466 kW. The energy absorbed by each transformer for 24 hours of measurement, for BHT01 is 6.44 MWh, BHT02 absorb 14.8 MWh and BHT03 absorb 10.9 MWh. (author)

  2. LOGISTICS ASPECTS OF PRACTICAL MARKETING IN ELECTRICITY COMPANY

    OpenAIRE

    Ewa Moroz

    2008-01-01

    An anonymous questionnaire was presented to employees of an electricity distribution company - Enion Grupa Tauron S.A. – Department Czestochowa. The research, in the part presented in this paper, referred to company-customer relations and to an influence that those relations have on costs and quality of work in the company, mainly in the aspect of employees’ understanding of those connections. In the paper author states the conclusion that suggests implementation of Lean Thinking procedures i...

  3. 77 FR 48110 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-08-13

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... certain General Electric Company (GE) CF6-80C2 series turbofan engines. The existing AD requires... 2000-04-14, Amendment 39-11597 (65 FR 10698, February 29, 2000), for all GE CF6-80C2 series turbofan...

  4. 78 FR 44899 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-07-25

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Electric Company (GE) GE90-110B1 and -115B turbofan engines. This proposed AD was prompted by multiple...) 2165M22P01, installed on GE90-110B1 and -115B turbofan engines. One of the leaks led to an under cowl engine...

  5. 76 FR 64844 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2011-10-19

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... General Electric Company (GE) CF6-45 and CF6-50 series turbofan engines with certain low-pressure turbine... series turbofan engines with certain LPT rotor stage 3 disks installed. That AD requires initial and...

  6. 78 FR 19628 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-04-02

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Electric Company (GE) GE90-76B, -85B, -90B, -94B, - 110B1, and -115B turbofan engines. This proposed AD was... of stage 1 HPT stator shroud distress resulting in engine removals on airplanes with GE90 turbofan...

  7. 77 FR 76977 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-12-31

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Supplemental notice... proposed airworthiness directive (AD) for certain General Electric Company (GE) CF6-80C2 series turbofan... part 39 to include an AD that would apply to certain GE CF6-80C2 series turbofan engines. That NPRM...

  8. 78 FR 47534 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-08-06

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... directive (AD) 2013-14-51 for General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines with... all known U.S. owners and operators of GE90-110B1 and GE90-115B turbofan engines. AD 2013-14-51...

  9. 78 FR 24671 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-04-26

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA... certain General Electric Company (GE) CF6-80C2 series turbofan engines. That AD currently requires.../B1F/B2F/B4F/B6F/B7F/D1F turbofan engines with any of the following installed: (1) Fuel tube, part...

  10. Reliability Evaluation for Optimizing Electricity Supply in a Developing Country

    OpenAIRE

    Mark Ndubuka NWOHU

    2007-01-01

    The reliability standards for electricity supply in a developing country, like Nigeria, have to be determined on past engineering principles and practice. Because of the high demand of electrical power due to rapid development, industrialization and rural electrification; the economic, social and political climate in which the electric power supply industry now operates should be critically viewed to ensure that the production of electrical power should be augmented and remain uninterrupted. ...

  11. 78 FR 43197 - Duke Energy Florida, Inc.; Florida Power & Light Company; Tampa Electric Company; Orlando...

    Science.gov (United States)

    2013-07-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ER13-1922-000; ER13-1929-000; ER13-1932-000; NJ13-11-000] Duke Energy Florida, Inc.; Florida Power & Light Company; Tampa Electric Company; Orlando Utilities Commission; Notice of Compliance Filings Take notice that on July 10, 2013, Duke Energy...

  12. Tariffs on power supply and prices of electricity per 1st January 1994

    International Nuclear Information System (INIS)

    1994-04-01

    The document gives a survey of the most usual types of tariffs connected with the Danish electric-power distribution companies and the prices, valid per January 1st, 1994, set by individual companies and also the cost to consumers of connection to the supply network. A survey of prices set by power plant administrators with regard to the distribution companies is also included in addition to a summary of the modes of calculation in connection with wind turbines not owned by the electricity companies and descriptions of models for calculations related to decentral and industrial plants. Local conditions such as structure, economy etc. must be taken into consideration when comparing prices set by companies in several different areas. (AB)

  13. Approach to securing of stable nuclear fuel supplies

    International Nuclear Information System (INIS)

    Koike, Kunihisa; Imamura, Isao; Noda, Tetsuya

    2010-01-01

    With the dual objectives of not only ensuring stable electric power supplies but also preventing global warming, the construction of new nuclear power plants is being planned in many countries throughout the world. Toshiba and Westinghouse Electric Company (WEC), a member of the Toshiba Group, are capable of supplying both boiling water reactor (BWR) and pressurized water reactor (PWR) plants to satisfy a broad range of customer requirements. Furthermore, to meet the growing demand for the securing of nuclear fuel supplies, Toshiba and WEC have been promoting the strengthening and further expansion of supply chains in the fields of uranium production, uranium hexafluoride (UF 6 ) conversion, uranium enrichment, and fuel fabrication. (author)

  14. Power supply requirements for a tokamak fusion reactor

    International Nuclear Information System (INIS)

    Brooks, J.N.; Kustom, R.L.

    1979-01-01

    The power supply requirements for a 7-m major radius commerical tokamak reactor have been examined, using a system approach combining models of the reactor and poloidal coil set, plasma burn cycle and magnetohydrodynamics calculations, and power supply characteristics and cost data. A conventional system using a motor-generator flywheel set and solid-state rectifier-inverter power supplies was studied in addition to systems using a homopolar generator, superconducting energy storage inductor, and dump resistors. The requirements and cost of the power supplies depend on several factors but most critically on the ohmic heating ramp time used for startup. Long ramp times (greater than or equal to 8 s) seem to be feasible, from the standpoint of resistive volt-second losses, and would appear to make conventional systems quite competitive with nonconventional ones, which require further research and development

  15. Power supply requirements for a tokamak fusion reactor

    International Nuclear Information System (INIS)

    Brooks, J.N.; Kustom, R.L.

    1979-02-01

    The power supply requirements for a 7-M major radius commercial tokamak reactor have been examined, using a system approach combining models of the reactor and poloidal coil set, plasma burn cycle and MHD calculations, and power supply characteristics and cost data. A conventional system using an MGF set and solid-state rectifier/inverter power supplies was studied in addition to systems using a homopolar generator, superconducting energy storage inductor, and dump resistors. The requirements and cost of the power supplies depend on several factors but most critically on the ohmic heating ramp time used for startup. Long ramp times (approx. > 8 s) seems to be feasible, from the standpoint of resistive volt-second losses, and would appear to make conventional systems quite competitive with nonconventional ones, which require further research and development

  16. Treatment of opinions, etc. in the public hearing on the alteration of reactor installation (addition of Unit 2) in the Shimane Nuclear Power Station of The Chugoku Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1983-01-01

    The Nuclear Safety Commission has acknowledged the governmental policy, and further decided on the treatment of the opinions expressed by the local people in the public hearing held in May, 1983, in Shimane Prefecture on the addition of Unit 2 to the Shimane Nuclear Power Station, Chugoku Electric Power Co., Inc. The NSC has directed the Committee on Examination of Reactor Safety to take into consideration the opinions in its later examination. The opinions expressed by the local people in the form of question are given as follows: siting conditions (earthquake, ground, weather, etc.), the safety design for reactor installation (general aspect, aseismatic design, core design, ECCS, the teaching of TMI accident, etc.), radioactive wastes, radiation exposure, site evaluation. (Mori, K.)

  17. The supply of steam from Candu reactors for heavy water production

    International Nuclear Information System (INIS)

    Robertson, R.F.S.

    1975-09-01

    By 1980, Canada's energy needs for D 2 O production will be 420 MW of electrical energy and 3600 MW of thermal energy (as steam). The nature of the process demands that this energy supply be exceptionally stable. Today, production plants are located at or close to nuclear electricity generating sites where advantage can be taken of the low cost of both the electricity and steam produced by nuclear reactors. Reliability of energy supply is achieved by dividing the load between the multiple units which comprise the sites. The present and proposed means of energy supply to the production sites at the Bruce Heavy Water Plant in Ontario and the La Prade Heavy Water Plant in Quebec are described. (author)

  18. Modular helium reactor for non-electric applications

    International Nuclear Information System (INIS)

    Shenoy, A.

    1997-01-01

    The high temperature gas-cooled Modular Helium Reactor (MHR) is an advanced, high efficiency reactor system which can play a vital role in meeting the future energy needs of the world by contributing not only to the generation of electric power, but also the non-electric energy traditionally served by fossil fuels. This paper summarizes work done over 20 years, by several people at General Atomics, how the Modular Helium Reactor can be integrated to provide different non-electric applications during Process Steam/Cogeneration for industrial application, Process Heat for transportation fuel development and Hydrogen Production for various energy applications. The MHR integrates favorably into present petrochemical and primary metal process industries, heavy oil recovery, and future shale oil recovery and synfuel processes. The technical fit of the Process Steam/Cogeneration Modular Helium Reactor (PS/C-MHR) into these processes is excellent, since it can supply the required quantity and high quality of steam without fossil superheating. 12 refs, 25 figs, 2 tabs

  19. Reactor design for nuclear electric propulsion

    International Nuclear Information System (INIS)

    Koenig, D.R.; Ranken, W.A.

    1979-01-01

    Conceptual design studies of a nuclear power plant for electric propulsion of spacecrafts have been on going for several years. An attractive concept which has evolved from these studies and which has been described in previous publications, is a heat-pipe cooled, fast spectrum nuclear reactor that provides 3 MW of thermal energy to out-of-core thermionic converters. The primary motivation for using heat pipes is to provide redundancy in the core cooling system that is not available in gas or liquid-metal cooled reactors. Detailed investigation of the consequences of heat pipe failures has resulted in modifications to the basic reactor design and has led to consideration of an entirely different core design. The new design features an integral laminated core configuration consisting of alternating layers of UO 2 and molybdenum sheets that span the entire diameter of the core. Design characteristics are presented and compared for the two reactors

  20. Supply Chian Risk Management in China -- A cae study of two manufacturing companies in China

    OpenAIRE

    Sui, Zhiyu

    2013-01-01

    In the currently business world, companies face high competitive pressures from trends of global outsourcing, varieties of product types, shorter products life cycle. This result in increasing complexity of supply chain network and a high level of supply chain risks. In addition, supply chain risk management become vital and can be used to mitigate supply chain risks. There are many previous research focused on supply chain risk management in developed countries, but not many take depth resea...

  1. Power of Companies in Supply Chains and Their Effect on Network Development

    OpenAIRE

    Tamás Brányi; László Józsa

    2015-01-01

    A general supply chain functions as a closed cluster and consists of at least three companies: supplier, producer and buyer. In an optimal case the companies within a supply chain are well integrated, partnership rests on trust which results in common strategic decisions. Business practices show that there is a stronger company within the chain that uses its power position to influence network development. The objective of the research is to measure how and what kind of power position is need...

  2. Solar island electricity supply at Flanitzhuette. Solare Inselstromversorgung Flanitzhuette

    Energy Technology Data Exchange (ETDEWEB)

    Kranz, U. (Bayernwerk AG, Muenchen (Germany))

    1993-01-01

    The aim of this research project is the planning, erection and operation of a permanent electricity supply independent of the grid based on photo-electrics for an isolated hamlet in the Bavarian Forest. Criteria for the development and optimisation of solar electricity supply concepts are to be obtained from practical experience. The investigation and exploitation of energ saving potential and an harmonious integration of the solar plant in the landscape are also important aspects. (orig.)

  3. Passive safe small reactor for distributed energy supply system sited in water filled pit at seaside

    International Nuclear Information System (INIS)

    Ishida, Toshihisa; Imayoshi, Shou

    2003-01-01

    Japan Atomic Energy Research Institute has developed a Passive Safe Small Reactor for Distributed Energy Supply System (PSRD) concept. The PSRD is an integrated-type PWR with reactor thermal power of 100 to 300 MW aimed at supplying electricity, district heating, etc. In design of the PSRD, high priority is laid on enhancement of safety as well as improvement of economy. Safety is enhanced by the following means: i) Extreme reduction of pipes penetrating the reactor vessel, by limiting to only those of the steam, the feed water and the safety valves, ii) Adoption of the water filled containment and the passive safety systems with fluid driven by natural circulation force, and iii) Adoption of the in-vessel type control rod drive mechanism, accompanying a passive reactor shut-down device. For improvement of economy, simplification of the reactor system and long operation of the core over five years without refueling with low enriched UO 2 fuel rods are achieved. To avoid releasing the radioactive materials to the circumstance even if a hypothetical accident, the containment is submerged in a pit filled with seawater at a seaside. Refueling or maintenance of the reactor can be conducted using an exclusive barge instead of the reactor building. (author)

  4. Auxiliary water supply device for BWR type reactor

    International Nuclear Information System (INIS)

    Sasagawa, Hiroshi.

    1994-01-01

    In the device of the present invention, a cooling condensation means is disposed to a steam discharge channel of a turbine for driving pumps to directly return condensates to the reactor, so that the temperature of the suppression pool water is not elevated. Namely, the cooling condensation means for discharged steams is disposed to the discharge channel of the turbine. The condensate channel from the cooling condensation means is connected to a sucking side of the turbine driving pump. With such a constitution, when the reactor is isolated from a main steam system, reactor scram is conducted. Although the reactor water level is lowered by the reactor scram, the lowering of the reactor water level is prevented by supplementing cooling water by the turbine driving pump using steams generated in the reactor as a power source. The discharged steams after driving the turbine are cooled and condensated by the cooling condensation means by way of the discharge channel and returned to the reactor again by way of the condensate channel. With such procedures, since the temperature of suppression pool water is not elevated, there is no need to operate other cooling systems. In addition, auxiliary water can be supplied for a long period of time. (I.S.)

  5. Power of Companies in Supply Chains and Their Effect on Network Development

    Directory of Open Access Journals (Sweden)

    Tamás Brányi

    2015-01-01

    Full Text Available A general supply chain functions as a closed cluster and consists of at least three companies: supplier, producer and buyer. In an optimal case the companies within a supply chain are well integrated, partnership rests on trust which results in common strategic decisions. Business practices show that there is a stronger company within the chain that uses its power position to influence network development. The objective of the research is to measure how and what kind of power position is needed to influence the supply chain. The hypothesis states, that power and network development are opposite effects in a supply chain. Statistical examination of data gained from 221 companies state that the company with power position has advantages if the supply chain extends. SPSS analysis proves that the hypothesis is false and opens a new direction of research. Companies within the supply chain have to cope with power structures while cooperating with each other. They tend to look for solutions to ease dependency. Using or misusing power has several factors; mainly they are inherited from the strongest link of the supply chain. This is usually a problem but the results of the statistical analysis show that still a win-win situation is needed for the companies in order to deepen the cooperation. To conclude this research the data shows that the goal is to be more competitive as a chain, not just as a company.

  6. Model Design on Emergency Power Supply of Electric Vehicle

    Directory of Open Access Journals (Sweden)

    Yuanliang Zhao

    2017-01-01

    Full Text Available According to the mobile storage characteristic of electric vehicles, an emergency power supply model about the electric vehicles is presented through analyzing its storage characteristic. The model can ensure important consumer loss minimization during power failure or emergency and can make electric vehicles cost minimization about running, scheduling, and vindicating. In view of the random dispersion feature in one area, an emergency power supply scheme using the electric vehicles is designed based on the K-means algorithm. The purpose is to improve the electric vehicles initiative gathering ability and reduce the electric vehicles gathering time. The study can reduce the number of other emergency power supply equipment and improve the urban electricity reliability.

  7. INTERDEPENDENCE AND SECURITY OF ELECTRICITY SUPPLY OF A SMALL COUNTRY: THE CASE OF LITHUANIA

    Energy Technology Data Exchange (ETDEWEB)

    Juozaitis, R.; Bacauskas, A.

    2007-07-01

    In the report there are described the circumstances of operation of Lithuanian power system. A common plan of the Baltic power companies to build a new nuclear power plant is discussed. The report elaborates on the plans of necessary interconnections for integration of the Baltic power systems into the EU electricity market, ensuring security of supply in the Baltic region and availability to install efficient bigger capacity generation units in power stations. The experience of Lithuania demonstrates that interdependence in power sector is an advantage in maintaining security of electricity supply. (auth)

  8. Research and development in the electricity supply industry conference

    International Nuclear Information System (INIS)

    1995-01-01

    This document summarizes the views expressed in the conference papers. These are grouped into fuels for the future, coal fired powers stations, renewables, use of heat as a by-product of electricity generation, fuel cells, electric vehicles, and environmental issues in the electricity supply industry. The points and ideas from the two workshops held in conjunction with the conference are also summarized

  9. Sub-Saharan Africa Electricity Supply Inadequacy: Implications ...

    African Journals Online (AJOL)

    Africa has many electricity supply problems with major causes being natural causes (drought), oil price shock, system disruption by conflict, and low investment in electricity generation. To solve the problem, many countries adopted several reforms. However, the reforms failed to bring solutions. Electricity sector privatisation ...

  10. Electricity intensity backstop level to meet sustainable backstop supply technologies

    International Nuclear Information System (INIS)

    Verbruggen, Aviel

    2006-01-01

    The concept of a backstop level of electricity intensity is introduced and illustrated for the highest income economies of the world. The backstop level corresponds with the intensity that would be triggered by applying end-use electricity prices equal to the cost price of a fully sustainable electricity supply. Section 1 of the paper discusses the issue of electricity (also energy) intensity of economies. It is argued that identifying a 'demand for electricity intensity' bridges the gap between the high willingness to pay for electricity services on the one hand and the disinterested attitude of consumers regarding the invisible and impalpable product electricity on the other hand. Assessment of the demand curve for electricity intensity in a cross section of high income OECD countries comes to a long-run price elasticity of almost -1. Section 2 revives Nordhaus' concept of backstop supply technologies for weighing three power sources (fossil, nuclear, and renewable sources) in meeting today's criteria of sustainable backstop technology. Only renewable sources meet the main sustainability criteria, but the economic cost of a fully sustainable electricity supply will be elevated. The closing question of Section 3, that is, whether the countries can afford the high cost of backstop electricity supplies, is answered by indicating what reductions in intensity are required to keep the electricity bills stable. The targeted intensity level is called the backstop level, and provides a fixed point for electricity efficiency policies. The analysis supports the call for comprehensive and enduring tax reform policies

  11. Electrical power supply and process heat supply options

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    This paper consists of an economic analysis in which three geothermal electricity production scenarios are evaluated. The first is a 400 MW facility using cost and production data developed in this study. The other two are 400 and 880 MW units using cost data from a separate State of Hawaii study made to evaluate the economic feasibility of an interisland submersible electricity cable. In all cases, the scenarios are evaluated using the same economic model described, but in this case also reflecting depletion allowances permitted by the tax code. The output price is measured as cents per kWh, assuming delivery of the power to a bulk buyer at the plant fence. The two cases reflecting the State of Hawaii study use lower capital costs, which result in lower electricity prices when evaluated through the economic model. Since the assumptions of these two cases were not developed under this study, the resulting price figures are not used as part of the base case integrated systems. Rather, they are presented only as a special case, and are used as one scenario in the sensitivity analyses of integrated systems

  12. Sustainability of electricity supply technology portfolio

    International Nuclear Information System (INIS)

    Roth, Stefan; Hirschberg, Stefan; Bauer, Christian; Burgherr, Peter; Heck, Thomas; Schenler, Warren; Dones, Roberto

    2008-01-01

    This paper outlines the approach to the evaluation of sustainability of current and future electricity supply options of interest for a major Swiss utility Axpo Holding AG. The motivation behind this effort has been to provide a solid basis for a state-of-the-art interdisciplinary assessment and use this framework within a dialog with a wide spectrum of stakeholders. The development and implementation of the methodology was coordinated by Axpo in co-operation with the Paul Scherrer Institut (PSI) and other scientific institutions. The evaluation covers environmental, social and economic dimensions of sustainability. Methods used include among others Life Cycle Assessment (LCA), Impact Pathway Approach (IPA) and Probabilistic Safety Assessment (PSA). The associated databases developed by PSI have been extensively used, subject to major extensions necessary for analysing the future technologies. Learning curves were employed for future cost estimates. Furthermore, particularly in the social area expert surveys were used. The results were aggregated using total (internal plus external) costs approach and Multi-criteria Decision Analysis (MCDA). For MCDA a set of criteria and the associated indicators was established. In total 75 indicators were quantified, including 11 environmental, 33 social and 31 economic. 18 current and 18 future technologies have been analysed including nuclear as well as fossil and renewable technologies. Total costs were estimated for these technologies providing a clear ranking with nuclear having the lowest costs and some of the renewable showing remarkable cost reductions until 2030. This ranking is partially controversial mainly due to the limited representation of social aspects in the total costs. The results of MCDA-applications involving elicitation of preferences from a relatively homogeneous stakeholder group, i.e. 85 employees of the Axpo Group (including also NOK, EGL, CKW and Axpo IT), are summarized. In addition, sensitivity of

  13. Sustainability of electricity supply technology portfolio

    International Nuclear Information System (INIS)

    Roth, Stefan; Hirschberg, Stefan; Bauer, Christian; Burgherr, Peter; Dones, Roberto; Heck, Thomas; Schenler, Warren

    2009-01-01

    This paper outlines the approach to the evaluation of sustainability of current and future electricity supply options of interest for a major Swiss utility Axpo Holding AG. The motivation behind this effort has been to provide a solid basis for a state-of-the-art interdisciplinary assessment and use this framework within a dialog with a wide spectrum of stakeholders. The development and implementation of the methodology was coordinated by Axpo in co-operation with the Paul Scherrer Institut (PSI) and other scientific institutions. The evaluation covers environmental, social and economic dimensions of sustainability. Methods used include among others life cycle assessment (LCA), impact pathway approach (IPA) and probabilistic safety assessment (PSA). The associated databases developed by PSI have been extensively used, subject to major extensions necessary for analyzing the future technologies. Learning curves were employed for future cost estimates. Furthermore, particularly in the social area expert surveys were used. The results were aggregated using total (internal plus external) costs approach and multi-criteria decision analysis (MCDA). For MCDA a set of criteria and the associated indicators was established. In total 75 indicators were quantified, including 11 environmental, 33 social and 31 economic. Eighteen current and 18 future technologies have been analysed including nuclear as well as fossil and renewable technologies. Total costs were estimated for these technologies providing a clear ranking with nuclear having the lowest costs and some of the renewables showing remarkable cost reductions until 2030. This ranking is partially controversial mainly due to the limited representation of social aspects in the total costs. The results of MCDA-applications involving elicitation of preferences from a relatively homogeneous stakeholder group, i.e. 85 employees of the Axpo Group (including also NOK, EGL, CKW and Axpo IT), are summarized. In addition

  14. Procurement of natural gas in power supply companies. Strategies of procurement for EVU; Gasbeschaffung in Energieversorgungsunternehmen. Beschaffungsstrategien fuer EVU

    Energy Technology Data Exchange (ETDEWEB)

    Weber, Janina; Soennecken, Arno [IEBT GmbH Institute for Energy Business and Technology, Herdecke (Germany)

    2012-09-10

    Since the implementation of the EU directive on the liberalization of the gas market, the time of monopolistic areal supply is gone. Within the Energy Economy Law (EnWG) the European regulations on the internal electricity and gas market have been transposed into national law. Due to the rapid development utility companies need to burst old structures in order to remain competitive and to take advantage of opportunities arising in the market.

  15. Explaining the inefficiency of electrical distribution companies. Peruvian firms

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Reyes, Raul [Organismo Supervisor de la Inversion en Energia y Mineria, OSINERGMIN (Peru); Tovar, Beatriz [Infrastructure and Transport Research Group (EIT), Department of Applied Economics, University of Palmas de Gran Canaria (Spain)

    2010-09-15

    This paper investigates the extent to which the structural reform of the Peruvian electricity market, implemented in the 1990s, has improved the efficiency of the distribution companies; and it evaluates the influence on efficiency of firm specific explanatory variables. To do this, we rely on data from 14 distribution companies between 1996 and 2006. The results indicate that the incentives generated by the reform process led to the firms becoming more efficient. Moreover, the time trend and private management of the distribution companies are variables that positively affect the levels of efficiency, whereas the lower network densities are then the greater the inefficiency. (author)

  16. Explaining the inefficiency of electrical distribution companies. Peruvian firms

    International Nuclear Information System (INIS)

    Perez-Reyes, Raul; Tovar, Beatriz

    2010-01-01

    This paper investigates the extent to which the structural reform of the Peruvian electricity market, implemented in the 1990s, has improved the efficiency of the distribution companies; and it evaluates the influence on efficiency of firm specific explanatory variables. To do this, we rely on data from 14 distribution companies between 1996 and 2006. The results indicate that the incentives generated by the reform process led to the firms becoming more efficient. Moreover, the time trend and private management of the distribution companies are variables that positively affect the levels of efficiency, whereas the lower network densities are then the greater the inefficiency. (author)

  17. Nuclear reactors for space electric power

    International Nuclear Information System (INIS)

    Buden, D.

    1978-06-01

    The Los Alamos Scientific Laboratory is studying reactor power plants for space applications in the late 1980s and 1990s. The study is concentrating on high-temperature, compact, fast reactors that can be coupled with various radiation shielding systems and thermoelectric, dynamic, or thermionic electric power conversion systems, depending on the mission. Lifetimes of 7 to 10 yr at full power, at converter operating temperatures of 1275 to 1675 0 K, are being studied. The systems are being designed such that no single-failure modes exist that will cause a complete loss of power. In fact, to meet the long lifetimes, highly redundant design features are being emphasized. Questions have been raised about safety since the COSMOS 954 incident. ''Fail-safe'' means to prevent exposure of the population to radioactive material, meeting the environmental guidelines established by the U.S. Government have been and continue to be a necessary requirement for any space reactor program. The major safety feature to prevent prelaunch and launch radioactive material hazards is not operating the reactor before achieving the prescribed orbit. Design features in the reactor ensure that accidental criticality cannot occur. High orbits (above 400 to 500 nautical miles) have sufficient lifetimes to allow radioactive elements to decay to safe levels. The major proposed applications for satellites with reactors in Earth orbit are in geosynchronous orbit (19,400 nautical miles). In missions at geosynchronous orbit, where orbital lifetimes are practically indefinite, the safety considerations are negligible. Orbits below 400 to 500 nautical miles are the ones where a safety issue is involved in case of satellite malfunction. The potential missions, the question of why reactors are being considered as a prime power candidate, reactor features, and safety considerations will be discussed

  18. Interim supply in the electricity industry

    Energy Technology Data Exchange (ETDEWEB)

    Strassburg, W

    1977-06-01

    The interim supply or the so-called 'condition without a contract' can occur within the framework of energy supply in the relationship between 1) public utility and tariff customer, 2) public utility and the special last-in-line consumer, 3) supplying and distributing public utility, 4) public utility and territorial administrative body. The present contribution deals with the cases named under (3) and (4). Cases (1) and (2) were dealt with in a previous article. Relevant contract clauses and laws and their effects on contracting partners are discussed.

  19. Interim supply in the electricity industry

    Energy Technology Data Exchange (ETDEWEB)

    Strassburg, W

    1977-05-01

    The interim supply or the so-called 'condition without a contract' can occur within the framework of energy supply in the relationship between: 1) public utility and tariff customer, 2) public utility and the special last-in-line consumer, 3) supplying and distributing public utility, 4) public utility and territorial administrative body. The contribution at hand deals with the cases under 1) and 2); cases 3) and 4) are dealt with in an article to be published. Relevant contract clauses and laws and their effects on contracting partners are discussed. 41 references.

  20. ESB-Based Sensor Web Integration for the Prediction of Electric Power Supply System Vulnerability

    Science.gov (United States)

    Stoimenov, Leonid; Bogdanovic, Milos; Bogdanovic-Dinic, Sanja

    2013-01-01

    Electric power supply companies increasingly rely on enterprise IT systems to provide them with a comprehensive view of the state of the distribution network. Within a utility-wide network, enterprise IT systems collect data from various metering devices. Such data can be effectively used for the prediction of power supply network vulnerability. The purpose of this paper is to present the Enterprise Service Bus (ESB)-based Sensor Web integration solution that we have developed with the purpose of enabling prediction of power supply network vulnerability, in terms of a prediction of defect probability for a particular network element. We will give an example of its usage and demonstrate our vulnerability prediction model on data collected from two different power supply companies. The proposed solution is an extension of the GinisSense Sensor Web-based architecture for collecting, processing, analyzing, decision making and alerting based on the data received from heterogeneous data sources. In this case, GinisSense has been upgraded to be capable of operating in an ESB environment and combine Sensor Web and GIS technologies to enable prediction of electric power supply system vulnerability. Aside from electrical values, the proposed solution gathers ambient values from additional sensors installed in the existing power supply network infrastructure. GinisSense aggregates gathered data according to an adapted Omnibus data fusion model and applies decision-making logic on the aggregated data. Detected vulnerabilities are visualized to end-users through means of a specialized Web GIS application. PMID:23955435

  1. ESB-Based Sensor Web Integration for the Prediction of Electric Power Supply System Vulnerability

    Directory of Open Access Journals (Sweden)

    Milos Bogdanovic

    2013-08-01

    Full Text Available Electric power supply companies increasingly rely on enterprise IT systems to provide them with a comprehensive view of the state of the distribution network. Within a utility-wide network, enterprise IT systems collect data from various metering devices. Such data can be effectively used for the prediction of power supply network vulnerability. The purpose of this paper is to present the Enterprise Service Bus (ESB-based Sensor Web integration solution that we have developed with the purpose of enabling prediction of power supply network vulnerability, in terms of a prediction of defect probability for a particular network element. We will give an example of its usage and demonstrate our vulnerability prediction model on data collected from two different power supply companies. The proposed solution is an extension of the GinisSense Sensor Web-based architecture for collecting, processing, analyzing, decision making and alerting based on the data received from heterogeneous data sources. In this case, GinisSense has been upgraded to be capable of operating in an ESB environment and combine Sensor Web and GIS technologies to enable prediction of electric power supply system vulnerability. Aside from electrical values, the proposed solution gathers ambient values from additional sensors installed in the existing power supply network infrastructure. GinisSense aggregates gathered data according to an adapted Omnibus data fusion model and applies decision-making logic on the aggregated data. Detected vulnerabilities are visualized to end-users through means of a specialized Web GIS application.

  2. ESB-based Sensor Web integration for the prediction of electric power supply system vulnerability.

    Science.gov (United States)

    Stoimenov, Leonid; Bogdanovic, Milos; Bogdanovic-Dinic, Sanja

    2013-08-15

    Electric power supply companies increasingly rely on enterprise IT systems to provide them with a comprehensive view of the state of the distribution network. Within a utility-wide network, enterprise IT systems collect data from various metering devices. Such data can be effectively used for the prediction of power supply network vulnerability. The purpose of this paper is to present the Enterprise Service Bus (ESB)-based Sensor Web integration solution that we have developed with the purpose of enabling prediction of power supply network vulnerability, in terms of a prediction of defect probability for a particular network element. We will give an example of its usage and demonstrate our vulnerability prediction model on data collected from two different power supply companies. The proposed solution is an extension of the GinisSense Sensor Web-based architecture for collecting, processing, analyzing, decision making and alerting based on the data received from heterogeneous data sources. In this case, GinisSense has been upgraded to be capable of operating in an ESB environment and combine Sensor Web and GIS technologies to enable prediction of electric power supply system vulnerability. Aside from electrical values, the proposed solution gathers ambient values from additional sensors installed in the existing power supply network infrastructure. GinisSense aggregates gathered data according to an adapted Omnibus data fusion model and applies decision-making logic on the aggregated data. Detected vulnerabilities are visualized to end-users through means of a specialized Web GIS application.

  3. Reactor units for power supply of remote and inaccessible regions: Selection issue

    Directory of Open Access Journals (Sweden)

    Melnikov N.N.

    2015-06-01

    Full Text Available The paper briefly presents the problem aspects on power supply for the remote and inaccessible regions of Russia. Reactor units of different type and installed electric capacity have been considered in relation to the issue of power supply during mineral deposit development in the Chukotka autonomous region, Yakutia and Irkutsk region. Some preliminary assessment of the possible options for use of small nuclear power plants in various sectors of energy consumption have been carried out based on the analysis of different scenarios for economic development of the regions considered

  4. Seventh report of the ten on the Swiss electrical economy: endangered supply in the next 20 years

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    The seventh report of the ten major companies in the Swiss electric industry is discussed. The report predicts that, even with the addition of the Kaiseraugst nuclear power station, there will be a deficit in the supply of electricity compared with demand of some 4 milliards kWh by the winter of 2004/2005

  5. Quantitative Analysis of the Impact of Changes in Policies and Regulations for Electricity and Town Gas Supply Industries (Japanese)

    OpenAIRE

    KAINOU Kazunari

    2005-01-01

    In the 1990s, a series of changes were made to policies and regulations governing electricity and town gas supply industries in Japan. To evaluate how such regulatory changes, channeled through the behavior of power/gas companies, have affected the economic welfare of the electricity and town gas markets, it is necessary to first quantitatively analyze how the power/gas companies reacted to the regulatory changes in terms of management behavior. Specifically, it must be examined what decision...

  6. Future conditions for integration of the Baltic Electricity Supply System

    International Nuclear Information System (INIS)

    1999-01-01

    The economies of Estonia, Latvia and Lithuania developed in close association with the north-west region of the former Soviet Union. This is especially true for energy supply systems and electricity generation and transmission; the Baltic States depend on Russia for much of their primary energy needs, and export power to Russia and Belarus. In restructuring their electricity industries, the Baltic States hope to establish closer relationships and trade with Western Europe. The initial focus has been on changes to the legislative framework, industry restructuring and the establishment of new regulatory institutions. Vertically integrated utilities are in the process of being broken up into a number of separate generation, transmission and distribution companies. This restructuring is a prelude to privatisation. The states aim to establish a common power market among themselves, and hope to integrate this market with neighbouring (Nordic and European) markets. Despite the target set by the Baltic authorities of a common market by 2001, there is little clarity, as yet, on the framework and guidelines for the structure and functioning of the market. This process is supported by other players in the region, and the EU has recently prioritised closer co-operation and harmonisation of power networks in the Baltic Sea region. The Swedish National Energy Administration has identified cooperation on energy and environmental issues in the Baltic Sea region as one of its priorities. Consequently, the Administration commissioned ECON to analyse the conditions for closer linkages between the Baltic and Nordic electricity systems. This report presents the findings of this analysis

  7. Future conditions for integration of the Baltic Electricity Supply System

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The economies of Estonia, Latvia and Lithuania developed in close association with the north-west region of the former Soviet Union. This is especially true for energy supply systems and electricity generation and transmission; the Baltic States depend on Russia for much of their primary energy needs, and export power to Russia and Belarus. In restructuring their electricity industries, the Baltic States hope to establish closer relationships and trade with Western Europe. The initial focus has been on changes to the legislative framework, industry restructuring and the establishment of new regulatory institutions. Vertically integrated utilities are in the process of being broken up into a number of separate generation, transmission and distribution companies. This restructuring is a prelude to privatisation. The states aim to establish a common power market among themselves, and hope to integrate this market with neighbouring (Nordic and European) markets. Despite the target set by the Baltic authorities of a common market by 2001, there is little clarity, as yet, on the framework and guidelines for the structure and functioning of the market. This process is supported by other players in the region, and the EU has recently prioritised closer co-operation and harmonisation of power networks in the Baltic Sea region. The Swedish National Energy Administration has identified cooperation on energy and environmental issues in the Baltic Sea region as one of its priorities. Consequently, the Administration commissioned ECON to analyse the conditions for closer linkages between the Baltic and Nordic electricity systems. This report presents the findings of this analysis.

  8. Supply chain management in Forest products industry-case study for S?dra Cell Company

    Institute of Scientific and Technical Information of China (English)

    YAO; PAN

    2016-01-01

    The supply chain plays an increasing significant role in current global business operation process.It is not just considered as a crucial factor for leading the company to achieve their strategic goals,but also assisting firm’s to enhance the competitiveness in its own industry.This report choses the Swedish forest company-S?dra Cell as a case company to analysis its supply chain management advantages and disadvantages. It also states the role of supply chain management theory in assisting organization to achieve its strategic goal and marketing strategies.

  9. Design criteria for the electrical system in advanced passive reactors. Special features of the AP-600 Reactor

    International Nuclear Information System (INIS)

    Moraleda Lopez, A.

    1997-01-01

    The design of the electrical system of an Passive Advanced Reactor is determined by the concept of passive actuation of safety systems, simplification of process systems and optimisation of equipment performance. The system that results from these criteria is very different to those designed for present plants. The main differences are: No class 1E alternating current systems No emergency diesel generators Fewer safety and non-safety class electricity consumers System for continuous monitoring of battery status Use of electronic speed regulators for reactor feedwater pump motors Outsite battery backup safety power supply Motor-operated valves are the only safety electrical actuators Portable power supply for post 72 hour equipment This paper develops these concepts and applies them to the AP-600 project and describes the electrical system of this type of plant. (Author)

  10. Research on service strategy of electricity selling company under the reform of electricity market

    Science.gov (United States)

    Long, Zhuhan; Meng, Shiyu; Dou, Jinyue; Zeng, Ming; Sun, Chenjun

    2017-10-01

    The opening of the sale side of electricity market is an important goal of the new round of power system reform in China, and it is necessary to speed up the establishment and development of the electricity selling companies to achieve this goal. First of all, this paper defines the key problems, which are needed to be solved in the establishment of the sale side market, such as demand side response, optimization of users' power consumption mode, profit mode of electricity selling companies and fair competition in the market. On this basis, this paper analyzes the business of electricity selling company, from the aspects of the transition of business ideas, improving the energy efficiency level, providing integrated energy solutions and innovating business management mode; and then, the service strategies of electricity selling companies are put forward.

  11. Alternative strategies for electricity supply from RENEL's power plants

    International Nuclear Information System (INIS)

    Vladescu, A.; Popescu, M.; Breazu, F.; Valcereanu, G.; Oprea, G.; Velcescu, O.; Popovici, D.

    1996-01-01

    The transition to the market economy imposes the refurbishment and rehabilitation of the energy sector. This development must be based on the principles of economic efficiency having in view both the conditions of environmental protection and the energy demand and supply. This paper will describe some alternative strategies for electricity supply, taking into account the forecast of electricity demand integrated into total energy demand, as well as the environmental protection regulations. (author). 1 fig., 4 refs

  12. Electric power supply: the viability of natural gas cogeneration

    International Nuclear Information System (INIS)

    Paula, C.P. de; Ennes, S.A.W.

    1991-01-01

    The technical and economical aspects of Natural Gas conversion into electricity through cogeneration, analysing the potentials and costs of the power systems connections to downstream processes is related. The insertion impacts of these cogeneration potentials into the Electrical Network are also analysed, with special emphasis on the supply deficit risk reduction. The generation conditions for both auto-sufficiency and exceeding supply to network are determined, regarding the purposes of attendance efficiency improvement and the necessary new service stimulus. (author)

  13. 77 FR 58471 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-09-21

    ... Airworthiness Directives; General Electric Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA.../P1, GEnx-1B75/P1, GEnx- 2B67, and GEnx-2B67B turbofan engines. This AD requires initial and... this AD will affect 11 GE GEnx turbofan engines installed on airplanes of U.S. registry. We also...

  14. 76 FR 61687 - Pacific Gas and Electric Company

    Science.gov (United States)

    2011-10-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2479-011-CA] Pacific Gas and Electric Company Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission...

  15. The development strategies of the european electric power companies

    International Nuclear Information System (INIS)

    Heddebaud, D.

    2005-01-01

    This study takes stock on the european market of the electric power and of its development perspectives. It details the strategy and the place of the main operators and shows their forces and weaknesses. It provides a comparison of the financial performances of 28 companies (growth, margins, profitability, debt and war chest). (A.L.B.)

  16. Electric power supply for a mine: Principles and examples

    International Nuclear Information System (INIS)

    Mienville, G.; Grellety, J.

    1990-01-01

    The power supply of a water pumping system at the PEN or RAN mine is studied. A reliable pumping system was required because of the small volume of the available drainage reservoirs. Different power supply systems are considered. The 20 RV system configuration and adapted safety devices are described. The use of a generating set was required to ensure the mine operations. The power supply system in use allowed a reduction of the electricity cost [fr

  17. The diverse strategies of american electricity companies in the face of de-monopolization of the electricity market

    International Nuclear Information System (INIS)

    Finon, D.; Serrato, G.

    2000-01-01

    The electricity boards in the United States of America have adopted new strategies clearly influenced by anterior regulations and by de-monopolization. Numerous mergers are only the most spectacular of these strategies, enabling the start-up handicap of size in face of new competition to be surmounted, and offering the advantage of bringing together the supply of gas and electricity. Two principal means of adaptation for the gas and electricity boards are their development in non-regulated production (equipment sharing, setting up of merchant plants), and their involvement in bulk trade and competitive retail sales; moreover some choose to specialize in electronuclear production on transport. Lastly, internationalization and diversification towards telecommunications are more frequent there than elsewhere. The purpose of this article is to characterize these strategies in comparison with those of the European electricity companies

  18. A Fuzzy Linear Programming Model for Improving Productivity of Electrical Energy in Potable Water Supply Facilities (Case study: Sistan Water Supply Project

    Directory of Open Access Journals (Sweden)

    Vahid Baradaran

    2018-03-01

    Full Text Available One of the most important operational issues in urban drinking water production and distribution systems is to assign a plan for running hours of water supplying electric pumps. The cost of consuming electricity in these pumps allocates most of water and wastewater companies operational costs to itself which is dependent to their running hours. In this paper, meanwhile having a field study in Sistan rural water and wastewater company, the constraints for specifying electric pumps operational time in water supplying resources such as restrictions in fulfilling demand, supply potable water with suitable quality and uselessness of electric pumps have been identified. Due to uncertainty and fuzziness of the constraints, a linear programming model with fuzzy restrictions for determining electric pumps running hours per day is submitted with the aim to minimize electricity consumption and cost. After collecting and using required data for model, it proved that using the proposed model could reduce the costs of electrical energy and increase productivity up to 23 percent per month. The proposed mathematical fuzzy programming is able to specify electric pumps scheduling plan for water supply resources with the aim to reduce the costs of consuming energy.

  19. Development of Supervisory Control and Data Acquisition (SCADA) Electrical Supply in Malaysian Nuclear Agency

    International Nuclear Information System (INIS)

    Zainudin Jaafar; Mohd Ashhar Khalid; Mohd Hanafiah Chik

    2015-01-01

    Nuclear Power supplies in Malaysia supplied from the power utility company Tenaga Nasional Berhad through several substations before reaching the building and equipment. The power supply is received and passed down through the 11000 V high voltage switch gears to 415 V 3-phase or 1-phase 240 V. The equipment used in this process is dangerous and monitoring hardware operating remotely (remote) is the best as only guard machinery may engage in business operations. Similarly, the supply of electrical parameters should be monitored to ensure safe and continuous supply of and according to the appropriate voltage for record and analysis when needed. This paper discusses the monitoring and data acquisition is performed using the system 'Supervisory Control And Data Acquisition (SCADA) was developed. (author)

  20. The deregulation of Taiwan electricity supply industry

    International Nuclear Information System (INIS)

    Wang, K.M.

    2006-01-01

    Taiwan is on the brink of embarking on an ambitious reform in the electricity sector. The future electricity market of Taiwan will be operated under the framework set out in the Electricity Act Amendment. Independent system operator (ISO) will be the core body of the future market operations and its establishment will therefore be the key to the liberalization. This paper presents the proposed implementation plan based on diverse factors considered by the officials. A three steps phased introduction of Taiwan ISO is discussed. During the proposed Phase I interim market arrangements, Taipower's System Operation Department will assume the role of System Operator for the market. The dispatch rules are largely based on the existing Taipower internal procedure. As competition increases, the need for increased transparency will necessitate the establishment of a fully independent ISO in Phase II to provide the real time dispatch services. This will be completed within 2 years after the passage of the Electricity Act Amendment Bill. In the last phase of the deregulation process a multilateral market arrangement for managing energy imbalance and transmission constraints will result in better outcomes in relation to the policy objectives of security and economic efficiency. The 2-year timeframe stipulated in the Electricity Act Amendment Bill is a challenge for the Government and the industry. However, a smoothly functioning Taiwan ISO will bring benefits to the industry and the country in general

  1. The relationship between supply chain management strategy, marketing, logistics and company performance for breweries in Serbia

    OpenAIRE

    Ilić Dragan; Tešić Aleksandra

    2016-01-01

    The objective of this research is to demonstrate the importance of supply chain management strategy, logistics and marketing to overall company performance. We considered supply chain management strategy based on universality and integration, i.e., their company performance will be increased with implementing this strategy in breweries in Serbia. The strategy based on the universality and integration includes three parts: universality and integration with customers, suppliers, and in intra-or...

  2. Changes in the functions of undertakings in electricity supply

    International Nuclear Information System (INIS)

    Oberlack, H.W.

    1976-01-01

    For the electricity supply industry also it is necessary, by means of more intensive publicity work, to achieve the general realisation that neither new laws nor intervention of the state are required for dealing in the interests of the consumer with the problems arising, from great changes in all fields of business enterprise. It is more important for the electricity supply undertakings (EVU), by means of executive power and the administration of justice, to be put a position to carry out in the most efficient manner the functions entrusted to them by the Federal Government under the Power Supply Law and the energy programme. (orig.) [de

  3. Can Slovakia secure reliable electricity supply without nuclear?

    International Nuclear Information System (INIS)

    Pnacek, I.

    2004-01-01

    In this presentation author deals with structure of electricity production in the Slovak republic in 2006 and perspectives of electricity supply up to 2020 year. Decommissioning of Unit 1 and Unit 2 of the Bohunice NPP and completion of Unit 3 and 4 of the Mochovce NPP are discussed

  4. Electric power supply in Sweden 1979/80

    International Nuclear Information System (INIS)

    1981-01-01

    Generation, transmission and consumption of electricity for the year 1979/80 in Sweden are review in this report. The net supply of electricity in TWh was 60.2 from hydro, 20.1 from nuclear, 12.1 from fossil thermal and 1.4 imported. Detailed statistics are given for both consumption and generation. (L.E.)

  5. Procurement Options for New Renewable Electricity Supply

    Energy Technology Data Exchange (ETDEWEB)

    Kreycik, C. E.; Couture, T. D.; Cory, K. S.

    2011-12-01

    State renewable portfolio standard (RPS) policies require utilities and load-serving entities (LSEs) to procure renewable energy generation. Utility procurement options may be a function of state policy and regulatory preferences, and in some cases, may be dictated by legislative authority. Utilities and LSEs commonly use competitive solicitations or bilateral contracting to procure renewable energy supply to meet RPS mandates. However, policymakers and regulators in several states are beginning to explore the use of alternatives, namely feed-in tariffs (FITs) and auctions to procure renewable energy supply. This report evaluates four procurement strategies (competitive solicitations, bilateral contracting, FITs, and auctions) against four main criteria: (1) pricing; (2) complexity and efficiency of the procurement process; (3) impacts on developers access to markets; and (4) ability to complement utility decision-making processes. These criteria were chosen because they take into account the perspective of each group of stakeholders: ratepayers, regulators, utilities, investors, and developers.

  6. Physical characteristics of GE [General Electric] BWR [boiling-water reactor] fuel assemblies

    International Nuclear Information System (INIS)

    Moore, R.S.; Notz, K.J.

    1989-06-01

    The physical characteristics of fuel assemblies manufactured by the General Electric Company for boiling-water reactors are classified and described. The classification into assembly types is based on the GE reactor product line, the Characteristics Data Base (CDB) assembly class, and the GE fuel design. Thirty production assembly types are identified. Detailed physical data are presented for each assembly type in an appendix. Descriptions of special (nonstandard) fuels are also reported. 52 refs., 1 fig., 6 tabs

  7. Green marketing in the Massachusetts electric company retail competition pilot program

    Energy Technology Data Exchange (ETDEWEB)

    Rothstein, S.M.; Fang, J.M.

    1997-10-01

    With electric industry restructuring initiatives being introduced on the state and federal levels, retail access pilot programs serve an important function for examining competitive market issues, as well as marketing strategies and customer reactions to different power supply options. The experience gained through these pilots provides important insights into future power market operations, including the market for green power. The Massachusetts Electric Company`s (MECo`s) Choice: New England pilot for residential and small-business customers was a voluntary program developed primarily to test the billing and metering logistics that distribution companies will need in the competitive market. The pilot also offered a preview of program implementation and marketing under customer choice. It was the first retail competition pilot to explicitly include green power options in program design. The MECo pilot`s energy suppliers were selected through the issuance of a request for proposals (RFP). Respondents were asked to submit bids in one or more of three energy supply categories-price, green, and other options. These options were developed by the pilot administrator through internal meetings, discussions with state officials and other stakeholders, and a review of information from other similar pilots. For the green option, the pilot administrator did not establish a green standard. Instead, suppliers were allowed to submit offers that promoted environmental stewardship. Customer response to the different green options are reported. The pilot results clearly demonstrate that, in a competitive situation, there is interest in a variety of energy supply options, including green options. 2 tabs.

  8. Reliability Evaluation for Optimizing Electricity Supply in a Developing Country

    Directory of Open Access Journals (Sweden)

    Mark Ndubuka NWOHU

    2007-09-01

    Full Text Available The reliability standards for electricity supply in a developing country, like Nigeria, have to be determined on past engineering principles and practice. Because of the high demand of electrical power due to rapid development, industrialization and rural electrification; the economic, social and political climate in which the electric power supply industry now operates should be critically viewed to ensure that the production of electrical power should be augmented and remain uninterrupted. This paper presents an economic framework that can be used to optimize electric power system reliability. Finally the cost models are investigated to take into account the economic analysis of system reliability, which can be periodically updated to improve overall reliability of electric power system.

  9. Deploying Electric Vehicles and Electric Vehicle Supply Equipment: Tiger Teams Offer Project Assistance for Federal Fleets

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-01-02

    To assist federal agencies with the transition to plug-in electric vehicles (PEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory’s EVSE Tiger Teams.

  10. Concept of passive safe small reactor for distributed energy supply system

    International Nuclear Information System (INIS)

    Ishida, Toshihisa; Nakajima, Nobuya; Sawada, Ken-ichi; Yoritsune, Tsutomu; Shimada, Shoichiro; Nakano, Yoshihiro; Yonomoto, Taisuke; Takahashi, Hiroki

    2003-01-01

    This paper presents a concept of a Passive Safe Small Reactor for Distributed energy supply system (PSRD). The PSRD is an integrated-type PWR with reactor thermal power of 100 to 300 MW aimed at supplying electricity, district heating, etc. In design of the PSRD, high priority is laid on enhancement of safety as well as improvement of economy. Safety is enhanced by the following means: i) Extreme reduction of pipes penetrating the reactor vessel, by limiting to only those of the steam, the feed water and the safety valves, ii) Adoption of the water filled containment and the passive safety systems with fluid driven by natural circulation force, and iii) Adoption of the in-vessel type control rod drive mechanism, accompanying a passive reactor shut-down. To comply with a severe operation condition of PSRD, material of the ball bearing with graphite retainer has been selected by test. For improvement of economy, simplification of the reactor system and long operation of the core are achieved. Optimization of core design concerning the burnable poison ensures the burn-up of 28 GWd/t for low enriched UO 2 fuel rods. (author)

  11. Development of hot water supply system for a small district heating reactor

    International Nuclear Information System (INIS)

    Murase, Toshihiko; Narabayashi, Tadashi; Shimazu, Yoichiro

    2007-01-01

    On the earth, there are many environmental problems. For example, rapid increase of world population causes the enormous consumption of fossil fuel and emission of CO 2 into the global air. Now, mankaind faced to deal with these serious problems. One solution for these problems is utilization of nuclear reactors. Currently, about 65% of thermal output of a nuclear reactor is thrown away to the sea or the atmosphere through a turbine condenser. When a hot-water pipeline from a nuclear plant will be constructed, the exhaust heat from nuclear reactor will able to be utilized. Therefore, authors began to study nuclear power plant system for district heating. This reactor is based on a PWR plant. Its thermal output is 10 MWth and its electrical output is 3.4 MW. The nuclear plant supply electricity and heat for 2000 to 3000 houses. The plant aim to supply all the energy for the adjacent pepole's life, for example, heat, electricity and hydrogen for fuel battery car. This total-energy supply system assumed to be built in Northern area such as Hokkaido in Japan. In order to develop an optimum thermal design method for the system, heat transport experiments and thermal-hydraulic calculations were carried out. Using a metal pipe covered with foam-polyurethane thermal insulator, feed-water temperature and return-water temperature was measured to evaluate heat loss. As the result, the heat loss from the hot-water temperature was very little. The thermal-hydraulic calculation method was verified and applied to actual pipeline size calculation. The result of heat loss calculation will be 0.2degC/5 km. considering these results, the best pipe specification was obtained. (author)

  12. Tariff policy in Romania. Strategic elements for developing electricity supply

    International Nuclear Information System (INIS)

    Manea, D.; Indre, G.; Gugu, F.; Vilceanu, M.

    1996-01-01

    Starting from considerations of economic mechanisms as the main tools for developing electricity supply technology in Romania. The guidelines of Romanian policy for electricity rates and tariffs are presented. The main constraints and difficulties of designing rates and tariffs in a transitional economy are analysed. Models are presented for strategic development of rates and tariffs, and the role of tariffs is discussed in promoting electric technologies in Romanian social and economic activities. (author)

  13. Memorial 1997 - ENDESA (Chilean Electricity Company); ENDESA - Memoria 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-31

    This report provides a comprehensive survey, in depth assessment of the activities overview of ENDESA, Chilean Electricity Company, highlighting economical information and including historical and technical aspects. Economics is its focal point, but other relevant data are shown, like technical data on hydroelectric and thermoelectric power plants. Main activities developed by ENDESA are described, such in Chile as in the foreign. Data on power generation, transmission and transport are also presented and an economical balance of each colligated company are done and analysed 35 figs., 115 tabs.

  14. INTERACTION OF AIR TRANSPORTATION AND FUEL-SUPPLY COMPANIES

    Directory of Open Access Journals (Sweden)

    I. P. Zheleznaya

    2014-01-01

    Full Text Available The article describes the role of aviation fuel in the life of air transport. Fueling industry worldwide solves two main tasks - ensuring the safety and economy of air traffic. In Russia, there is one more task of airlines fuel supply. The article deals with fuel pricing taking into consideration today's realities.

  15. Electric vehicle system for charging and supplying electrical power

    Science.gov (United States)

    Su, Gui Jia

    2010-06-08

    A power system that provides power between an energy storage device, an external charging-source/load, an onboard electrical power generator, and a vehicle drive shaft. The power system has at least one energy storage device electrically connected across a dc bus, at least one filter capacitor leg having at least one filter capacitor electrically connected across the dc bus, at least one power inverter/converter electrically connected across the dc bus, and at least one multiphase motor/generator having stator windings electrically connected at one end to form a neutral point and electrically connected on the other end to one of the power inverter/converters. A charging-sourcing selection socket is electrically connected to the neutral points and the external charging-source/load. At least one electronics controller is electrically connected to the charging-sourcing selection socket and at least one power inverter/converter. The switch legs in each of the inverter/converters selected by the charging-source/load socket collectively function as a single switch leg. The motor/generators function as an inductor.

  16. Economic aspects of electricity and industrial heat generating reactors

    International Nuclear Information System (INIS)

    Gaussens, J.; Moulle, N.; Dutheil, F.

    1964-01-01

    The economic advantage of electricity-generating nuclear stations decreases when their size decreases. However, when a counter-pressure turbine is joined on to a reactor and the residual heat can be properly used, it can be shown that fairly low capacity nuclear equipment may compete with conventional equipment under certain realistic enough conditions. The aim of this paper is to define these special conditions under which nuclear energy can be profitable. They are connected with the location and the general economic environment of the station, the pattern of the electricity and heat demands it must meet, the level of fuel and specific capital costs, nuclear and conventional. These conditions entail certain technical and economic specifications for the reactors used in this way otherwise they are unlikely to be competitive. In addition, these results are referred to the potential steam and electricity market, which leads us to examine certain uses for the heat generated by double purpose power stations; for example, to supply combined industrial plants, various types of town heating and for removal of salt from sea water. (authors) [fr

  17. Primary energy sources for electricity supply in the FRG - demand and requirements as seen by the electricity supply industry

    International Nuclear Information System (INIS)

    Bierhoff, R.

    1977-01-01

    Starting from the present energy supply situation in the FRG, the attempt is made to elucidate basic tendencies for its development until 1990. The author pleads for the necessary growth by means of a series of theses. The supply with electric power being in the foreground can only be secured in the long run by means of greater utilization of coal and nuclear energy. Due to costs, other energy sources - playing a major role - will contribute less to the supply of electric power. (UA) [de

  18. Maximizing electrical power supply using FACTS devices

    OpenAIRE

    Lehmann, Karsten; Bent, Russell; Pan, Feng

    2015-01-01

    Modern society critically depends on the services electric power provides. Power systems rely on a network of power lines and transformers to deliver power from sources of power (generators) to the consumers (loads). However, when power lines fail (for example, through lightning or natural disasters) or when the system is heavily used, the network is often unable to fulfill all of the demand for power. While systems are vulnerable to these failures, increasingly, sophisticated control devices...

  19. Decentralized energy supply and electricity market structures

    OpenAIRE

    Weber, Christoph; Vogel, Philip

    2005-01-01

    Small decentralized power generation units (DG) are politically promoted because of their potential to reduce GHG-emissions and the existing dependency on fossil fuels. A long term goal of this promotion should be the creation of a level playing field for DG and conventional power generation. Due to the impact of DG on the electricity grid infrastructure, future regulation should consider the costs and benefits of the integration of decentralized energy generation units. Without an adequate c...

  20. Supply chain planning and management method:the fruit purchasing company case

    Directory of Open Access Journals (Sweden)

    Julio Kyosen Nakatani

    2018-06-01

    Full Text Available Abstract On the world stage, Brazil is the third largest world fruit producer. However, purchasing fruit companies are suffering from the effects of fluctuations in production and demand, inefficiency in production and information trade, lack of understanding of the dynamics of supply and reduction in profitability for all members of the fruit production chain. The supply chain management has been touted as one of the ways to reduce this volatility and improve outcomes for all involved with the supply chain. However, results of recent researches do not relate it directly to the fruit industry. To solve this problem, the present research aimed to analyze the planning and management of the supply chain of a fruit purchasing company and identify contributions and improvements to the theories and methods related to supply chain management to propose a method for planning and management the supply chain of fruit purchasing companies. It was conducted a case study from a mango fruit purchasing company using interviews with industry experts to assess the applicability, functionality and usefulness from the managerial point of view of the proposed method. Data analysis was done through the cross analysis of the methods of the supply chain management and the description of the case. The results of the study allowed the development of a method for planning and management the supply chain of fruit purchasing company. With the proposition of this method is expected to contribute with a sequence of steps to assist in planning and management of supply chain managers and specialists from a fruit purchasing company.

  1. The recent activities of nuclear power globalization. Our provision against global warming by global deployment of our own technologies as integrated nuclear power plant supply company'

    International Nuclear Information System (INIS)

    Yamauchi, Kiyoshi; Suzuki, Shigemitsu

    2008-01-01

    Mitsubishi Heavy Industries, Ltd. (MHI) is striving to expand and spread nuclear power plants as an 'Integrated Nuclear Power Plant Supply Company' based on its engineering, manufacturing, and technological support capabilities. The company also has ample experience in the export of major components. MHI is accelerating its global deployment through the market introduction of large-sized strategic reactor US-APWR, the joint development of a mid-sized strategic reactor ATMEA1 with AREVA, and a small strategic reactor PBMR. The company also plans to internationally deploy technologies for the nuclear fuel cycle. We present here the leading-edge trends in the global deployment of these nuclear businesses, all of which help to solve the energy and environmental issues in the world. (author)

  2. Smart Grid Innovation Management for SME Electricity Companies

    DEFF Research Database (Denmark)

    Tambo, Torben

    2011-01-01

    innovation process lies ahead for utility companies in screening, testing, maturing, implementing and operating smart grids. This process is expected to follow the political targets for CO2 reduction stretching forward until 2050. As no proven concepts exists, and as the process is expected to progress many...... years ahead, smart grid represents an excellent case of continuous innovation. The current study use a series of loosely related technological studies of smart grid related technologies in SME electricity companies to highlight critical issues in this innovation process. Major findings...... are that the companies have limited innovation capabilities, they are presented with plenty of technological offerings that eventually have to be rejected, and they suffer from absence of clear objectives....

  3. Electrical energy supply with permanent energy sources

    Energy Technology Data Exchange (ETDEWEB)

    1981-05-01

    It can be shown that there are no chances for solar and wind power plants in Northern Europe when estimating the investment costs and the floor space required. However, the decentralized utilization of the plants which is likely to become very interesting in a few years shows other results. As a complete annual balance by traditional stores would cause a considerably uneconomic increase of the investment costs supplementary energy sources are inevitable. The author points out how the various primary energy sources in question can be utilized and combined with each other. He describes the converters for the permanent (regenerative) energy sources, the available electrochemical stores and their application as well as the fundamental structures of the energy supply systems. Finally some advice is given regarding the recycling of energy and the operation by the consumers.

  4. Innovation and Sustainability in the Supply Chain of a Cosmetics Company: a Case Study

    Directory of Open Access Journals (Sweden)

    Andre Pereira de Carvalho

    2012-07-01

    Full Text Available The article analyses the induction process of technological innovations that consider economic, social and environmental concerns throughout the supply chain, in accordance with the proposals of sustainable development. Specifically, it examines the role of focal companies as innovation inductors for their supply chains. The article presents a debate with regards to innovation, sustainability and supply chain management and analyses the concept of sustainable innovation, as well as management models that bridge the gap between these themes. A case study conducted with a cosmetics company of Brazilian origin and presence in Latin America, is presented. This case study demonstrates that sustainable innovation driven by the focal company requires the engagement of its suppliers in order to reduce the negative social and environmental impacts throughout the product’s life cycle. Moreover, it illustrates that is possible to implement innovations that generate net social and environmental benefits for all members of the supply chain.

  5. Westinghouse Small Modular Reactor nuclear steam supply system design

    Energy Technology Data Exchange (ETDEWEB)

    Memmott, M. J.; Harkness, A. W.; Van Wyk, J. [Westinghouse Electric Company LLC, 600 Cranberry Woods Drive, Cranberry Twp. PA 16066 (United States)

    2012-07-01

    The Westinghouse Small Modular Reactor (SMR) is an 800 MWt (>225 MWe) integral pressurized water reactor (iPWR), in which all of the components typically associated with the nuclear steam supply system (NSSS) of a nuclear power plant are incorporated within a single reactor pressure vessel. This paper is the first in a series of four papers which describe the design and functionality of the Westinghouse SMR. Also described in this series are the key drivers influencing the design of the Westinghouse SMR and the unique passive safety features of the Westinghouse SMR. Several critical motivators contributed to the development and integration of the Westinghouse SMR design. These design driving motivators dictated the final configuration of the Westinghouse SMR to varying degrees, depending on the specific features under consideration. These design drivers include safety, economics, AP1000{sup R} reactor expertise and experience, research and development requirements, functionality of systems and components, size of the systems and vessels, simplicity of design, and licensing requirements. The Westinghouse SMR NSSS consists of an integral reactor vessel within a compact containment vessel. The core is located in the bottom of the reactor vessel and is composed of 89 modified Westinghouse 17x17 Robust Fuel Assemblies (RFA). These modified fuel assemblies have an active core length of only 2.4 m (8 ft) long, and the entirety of the core is encompassed by a radial reflector. The Westinghouse SMR core operates on a 24 month fuel cycle. The reactor vessel is approximately 24.4 m (80 ft) long and 3.7 m (12 ft) in diameter in order to facilitate standard rail shipping to the site. The reactor vessel houses hot and cold leg channels to facilitate coolant flow, control rod drive mechanisms (CRDM), instrumentation and cabling, an intermediate flange to separate flow and instrumentation and facilitate simpler refueling, a pressurizer, a straight tube, recirculating steam

  6. The development of multimedia communication system for electric power company

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Hee Gon; Kim, Seong Bok [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1995-12-31

    It is a final report of the research project that is a development of PC-LAN based multimedia desktop conference system, which is research on the essential technologies and application and development of multimedia communication services for electric power company. This report is consisted of -Survey and study of the multimedia related technologies, -Multimedia communication protocols and network configurations, and -Design, developments of pilot model, evaluation, and applications of multimedia conference system. (author). 112 refs., 250 figs.

  7. The development of multimedia communication system for electric power company

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Hee Gon; Kim, Seong Bok [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1996-12-31

    It is a final report of the research project that is a development of PC-LAN based multimedia desktop conference system, which is research on the essential technologies and application and development of multimedia communication services for electric power company. This report is consisted of -Survey and study of the multimedia related technologies, -Multimedia communication protocols and network configurations, and -Design, developments of pilot model, evaluation, and applications of multimedia conference system. (author). 112 refs., 250 figs.

  8. Supplying the nuclear arsenal: Production reactor technology, management, and policy, 1942--1992

    Energy Technology Data Exchange (ETDEWEB)

    Carlisle, R.P.; Zenzen, J.M.

    1994-01-01

    This book focuses on the lineage of America`s production reactors, those three at Hanford and their descendants, the reactors behind America`s nuclear weapons. The work will take only occasional sideways glances at the collateral lines of descent, the reactor cousins designed for experimental purposes, ship propulsion, and electric power generation. Over the decades from 1942 through 1992, fourteen American production reactors made enough plutonium to fuel a formidable arsenal of more than twenty thousand weapons. In the last years of that period, planners, nuclear engineers, and managers struggled over designs for the next generation of production reactors. The story of fourteen individual machines and of the planning effort to replace them might appear relatively narrow. Yet these machines lay at the heart of the nation`s nuclear weapons complex. The story of these machines is the story of arming the winning weapon, supplying the nuclear arms race. This book is intended to capture the history of the first fourteen production reactors, and associated design work, in the face of the end of the Cold War.

  9. Future challenges for the management of power supply companies; Zukuenftige Herausforderungen fuer das Management von EVU

    Energy Technology Data Exchange (ETDEWEB)

    Bausch, A. [Jena Univ. (Germany). Professur fuer Allgemeine Betriebswirtschaftslehre/Internationales Management; Jacobs Univ., Bremen (Germany). Professur fuer Strategisches Management und Controlling; Werthschulte, S.; Schumacher, T. [Accenture GmbH (Germany); Holst, A. [Jena Univ. (Germany). Professur fuer Allgemeine Betriebswirtschaftslehre/Internationales Management; Fritz, T. [Jacobs Univ., Bremen (Germany). Professur fuer Strategisches Management und Controlling

    2007-06-15

    Among the challenges on power supply companies seeking profitable growth are strategic corporate development in terms of product and process innovation and the management's and employees' capacity for change. This was the outcome of a survey conducted as part of the ''Value Creator III'' study performed among 130 executives of German, Austrian and Swiss companies operating in the energy sector. Based on a review of companies' past successes and expectations for the future the study presents business models for tomorrow's energy market and classifies companies within a past-and-future portfolio according to their market prospects.

  10. Opportunities to improve the private capital in Brazilian electricity supply industry

    International Nuclear Information System (INIS)

    Medeiros, R.A. de.

    1993-08-01

    The Brazilian electricity supply industry has passed substantial changes in the last fifty years. In the 50's was almost completely controlled by foreign companies. In the 70's, it turned to be almost exclusively ruled by Federal and State Enterprises. In the 80's the electricity supply sector started a financial and institutional crises. Some changes, already in course, indicate new changes of it for the next years. This study give emphasis to: the reasons that lead to a fast and well succeeded State intervention in the post-war; the multiple reasons of the recent crisis in sector, trying to insert it in the general context of the country; the alternative that have being formulated to overcome the obstacles created by the crisis; and the main factors for an efficient re-structure of the Brazilian electricity sector for the next years, included privatisation. (author)

  11. Electricity supply alternatives : the next five years

    International Nuclear Information System (INIS)

    Oliver, W.J.

    1998-01-01

    Characteristics of the energy market for New England and the state of New York were summarized. It was predicted that in the next five years, virtually all proposals for electricity generation for New England and New York will be gas-fired combined cycle projects which are designed to meet new generation requirements and displace older steam units. The status of nuclear plants will influence project economics. It has been estimated that New England will need about 6,000-7,000 MW by 2004. This need is driven by the current deficiencies and increased shortfalls due to load growth and economic retirements of 2,000-4,000 MW. Market assumptions for new entrants, merchant plant economics, gas requirements in New England, pipeline capacity and power generation, and the challenges facing the natural gas industry were reviewed. A list of proposed combined cycle natural gas merchant power plants and their generating capacity was also provided. 1 tab., 5 figs

  12. Gen-III/III+ reactors. Solving the future energy supply shortfall. The SWR-1000 option

    International Nuclear Information System (INIS)

    Stosic, Z.V.

    2006-01-01

    Deficiency of non-renewable energy sources, growing demand for electricity and primary energy, increase in population, raised concentration of greenhouse gases in the atmosphere and global warming are the facts which make nuclear energy currently the most realistic option to replace fossil fuels and satisfy global demand. The nuclear power industry has been developing and improving reactor technology for almost five decades and is now ready for the next generation of reactors which should solve the future energy supply shortfall. The advanced Gen-III/III+ (Generation III and/or III+) reactor designs incorporate passive or inherent safety features which require no active controls or operational intervention to manage accidents in the event of system malfunction. The passive safety equipment functions according to basic laws of physics such as gravity and natural convection and is automatically initiated. By combining these passive systems with proven active safety systems, the advanced reactors can be considered to be amongst the safest equipment ever made. Since the beginning of the 90's AREVA NP has been intensively engaged in the design of two advanced Gen-III+ reactors: (i) PWR (Pressurized Water Reactor) EPR (Evolutionary Power Reactor) and (ii) BWR (Boiling Water Reactor) SWR-1000. The SWR-1000 reactor design marks a new era in the successful tradition of BWR technology. It meets the highest safety standards, including control of a core melt accident. This is achieved by supplementing active safety systems with passive safety equipment of diverse design for accident detection and control and by simplifying systems needed for normal plant operation. A short construction period, flexible fuel cycle lengths and a high fuel discharge burn-up contribute towards meeting economic goals. The SWR-1000 completely fulfils international nuclear regulatory requirements. (author)

  13. Energy system analysis of marginal electricity supply in consequential LCA

    DEFF Research Database (Denmark)

    Lund, Henrik; Mathiesen, Brian Vad; Christensen, Per

    2010-01-01

    Background, aim and scope This paper discusses the identification of the environmental consequences of marginal electricity supplies in consequential life cycle assessments (LCA). According to the methodology, environmental characteristics can be examined by identifying affected activities, i...... in capacity but can be characterised as a complex set of affected electricity and heat supply technologies. A long-term YAM technology is identified for the Danish BAU2030 system in the case of three different long-term marginal changes in capacity, namely coal, natural gas or wind power. Discussion Four...... of four different situations are provided. We suggest that the technology mix with the installation of natural gas or coal power plant is applied as the marginal capacity. Conclusions The environmental consequences of marginal changes in electricity supply cannot always be represented solely by long...

  14. Renewable energy supply for electric vehicle operations in California

    OpenAIRE

    Papavasiliou, Anthony; Oren, Shmuel S.; Sidhy, Ikhlaq; Kaminsky, Phil; 32nd IAEE International Conference

    2009-01-01

    Due to technological progress, policy thrust and economic circumstances, the large scale integration of renewable energy sources such as wind and solar power is becoming a reality in California, however the variable and unpredictable supply of these renewable resources poses a significant obstacle to their integration. At the same time we are witnessing a strong thrust towards the large scale deployment of electric vehicles which can ideally complement renewable power supply by acting as stor...

  15. Pump selection and application in a pressurized water reactor electric generating plant

    International Nuclear Information System (INIS)

    Kitch, D.M.

    1985-01-01

    Various pump applications utilized in a nuclear pressurized water reactor electric generating plant are described. Emphasis is on pumps installed in the auxiliary systems of the primary nuclear steam supply system. Hydraulic and mechanical details, the ASME Code (Nuclear Design), materials, mechanical seals, shaft design, seismic qualification, and testing are addressed

  16. Modification of the Japanese first nuclear ship reactor for a regional energy supply system

    International Nuclear Information System (INIS)

    Sato, K.; Shimazu, Y.; Narabayashi, T.; Tsuji, M.

    2008-01-01

    Nuclear Ship Mutsu was developed as the first experimental nuclear ship of Japan. It has several advantages as a prototype for regional energy supply system. Considering the attractive advantages of the Mutsu reactor, we investigated the feasibility of development of a small regional energy system by adopting the Mutsu reactor as a starting model. The system could supply with not only electricity but also heat. Heat could be used for hot-water supply, a heating system of a house, melting snow and so on, especially for those in northern part of Japan. The system should satisfy the requirements for GEN IV systems and the current regulations. From this point of view, the modification of the reactor was initiated by taking into improvements and technology of the state of arts to fulfill the requirements such as (1) Longer core life without refueling, (2) Reactivity adjustment for load change without control rods or soluble boron, (3) Simpler operations for load changes and (4) Ultimate safety with sufficient passive capability. Currently it is assumed to use basic standard 17x17 fuel assembly design for WH type PWRs. Nuclear design calculations are carried out by 'SRAC 2002 ', which has been developed in Japan Atomic Energy Agency. Several problems have not been solved yet, but we confirmed the proposed core has about 10 years life time. So the proposed core has a possibility to be used for a small regional energy system. (authors)

  17. Supply chain risk management in newspaper company: House of risk approach

    Science.gov (United States)

    Ratnasari, Sintya; Hisjam, Muhammad; Sutopo, Wahyudi

    2018-02-01

    In the supply chain (SC) of newspapers, the printing company is the main entity that has several processes, i.e. procure raw materials, print plate and newspapers, and also distribute newspaper to consumers. The existing risks in the newspaper printing company are quite high. A wide range of disturbances or risks needs to be identified to map out the characteristics of the risk sources that will impact on the performance of the supply chain. Therefore, the printing companies need to manage their supply chain risk of the five major SC processes (such as plan, source, deliver, make, and return). In a case study of a newspaper company in Surakarta, the company have not implemented a risk management process that affects the company. This study is aimed to map the risks in the printing company and formulate risk mitigation alternatives to mitigate the risks. The house of risk (HOR) method was chosen to select a set of proactive actions deemed cost-effective in managing SC Risks in the newspaper company. The model consisting of two stages, the first stage (HOR1) was done by identifying risk, risk causing agents and then measured the severity and occurrences to calculate the Aggregate Risk Priority (ARP) value. The second stage (HOR2) is intended to formulate and prioritize the action of mitigation that the company should pursue to reduce the probability of risk agents to occur. The result shows that the innovative model of HOR in Newspaper Company was presented. There are 24 risk events, 20 causing agents and two priority risks in HOR1. The HOR 2 was proposed 9 ranks of mitigation strategy for priority risk agents, from the easiest to the hardest strategy for the company to implement it.

  18. Improvements in electric power supply in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Minovskii, Yu.P.; Nabokov, Eh.P.; Savel' ev, G.P.

    1985-01-01

    Reviews measures taken by major coal producing countries to increase output levels. Discusses research carried out into advance design of equipment in FRG, UK, USA and France and proposes establishment of central automatic control of electric power supply system in Soviet mines, improvement in underground power supply equipment, increase in reliability, stabilization of standby capacity in low voltage circuits, maintenance-free electrical equipment, and efficient spare part storage in underground workings. States that introduction of the proposed system (details are given) will ensure that Soviet mines will eventually reach the development level of foreign mines. 2 refs.

  19. Scenario analysis on future electricity supply and demand in Japan

    International Nuclear Information System (INIS)

    Zhang, Qi; Ishihara, Keiichi N.; Mclellan, Benjamin C.; Tezuka, Tetsuo

    2012-01-01

    Under continuing policies of CO 2 emissions reduction, it is crucial to consider scenarios for Japan to realize a safe and clean future electricity system. The development plans for nuclear power and renewable energy - particularly solar and wind power - are being reconsidered in light of the Fukushima nuclear accident. To contribute to this, in the present study, three electricity supply scenarios for 2030 are proposed according to different future nuclear power development policies, and the maximum penetration of renewable energy generation is pursued. On the other side of the equation, three electricity demand scenarios are also proposed considering potential energy saving measures. The purpose of the study is to demonstrate quantitatively the technological, economic and environmental impacts of different supply policy selections and demand assumptions on future electricity systems. The scenario analysis is conducted using an input–output hour-by-hour simulation model subject to constraints from technological, economic and environmental perspectives. The obtained installed capacity mix, power generation mix, CO 2 emissions, and generation cost of the scenarios were inter-compared and analyzed. The penetration of renewable energy generation in a future electricity system in Japan, as well as its relationship with nuclear power share was uncovered. -- Highlights: ► Scenario analysis is conducted on future electricity systems under different supply policies and demand assumptions. ► Scenario analysis is conducted using a input–output hour-by-hour simulation model for real-time demand-supply balance. ► The technological, economic and environmental impacts of supply policies and demand assumptions on future electricity systems are studied. ► The maximum penetration of renewable energy generation is pursued in the scenario analysis using the hour-by-hour simulation. ► The relationship between the penetration levels of renewable energy and nuclear power

  20. Competition and monopolies, exclusive rights for electricity companies

    International Nuclear Information System (INIS)

    Taccoen, L.

    1993-01-01

    The European Community has decided to liberalize the electric power industry within the community abolishing state monopolies, and allowing third party access. This policy was based on until then untested free-market theories. The advantage of state monopoly was that it could guarantee security of supply - vital with a non-storable commodity such as electricity. The advantages of TPA were said to be that it would lower prices, and that the market would ensure security of supply. The United Kingdom experimented in deregulation and end-user choice. In this experiment long-term planning has suffered, all new power stations are gas-fired because of low capital cost, and the effects on the British coal industry have been catastrophic. Thus, the effect of TPA seems to be a switch to natural gas, and an increase in prices to domestic consumers. Further research is needed, rather than a switch to TPA based on ideology alone

  1. Competition and monopolies, exclusive rights for electricity companies

    Energy Technology Data Exchange (ETDEWEB)

    Taccoen, L [Electricite de France (France)

    1993-01-01

    The European Community has decided to liberalize the electric power industry within the community abolishing state monopolies, and allowing third party access. This policy was based on until then untested free-market theories. The advantage of state monopoly was that it could guarantee security of supply - vital with a non-storable commodity such as electricity. The advantages of TPA were said to be that it would lower prices, and that the market would ensure security of supply. The United Kingdom experimented in deregulation and end-user choice. In this experiment long-term planning has suffered, all new power stations are gas-fired because of low capital cost, and the effects on the British coal industry have been catastrophic. Thus, the effect of TPA seems to be a switch to natural gas, and an increase in prices to domestic consumers. Further research is needed, rather than a switch to TPA based on ideology alone.

  2. Own power: Motives of having electricity without the energy company

    International Nuclear Information System (INIS)

    Leenheer, Jorna; Nooij, Michiel de; Sheikh, Omer

    2011-01-01

    New technologies will enable households to generate an increasing amount of their own electricity. Intentions to generate own power are a preliminary step towards actual behavior. Because own generation is still very limited and the behavior of early adopters may not be representative for the complete population, our study focuses on intentions rather than actual behavior. A consumer survey among 2047 Dutch households reveals that environmental concerns are the most important driver of a household's intention to generate its own power. Affinity with technology and energy and the reputation of electricity companies are also significant drivers, but financial factors and power outages are not. About 40% of Dutch households have an intention to generate their own power, with an overrepresentation of young households. This group falls apart in two sub segments; for the 'generating savers' (21%) a high intention to generate own power coincides with a high intention to save energy, whereas generating users (18%) combine a high intention to generate own power with a low intention to save energy. - Highlights: → A consumer survey studies household intentions to generate own power. → Environmental concerns are the most important motive for generating own power. → Other drivers are affinity with technology and reputation of electricity companies. → About 40% of Dutch households feel a need to generate their own electricity.

  3. Modern Solutions for Automation of Electrical Traction Power Supply Systems

    Directory of Open Access Journals (Sweden)

    Ana Mihaela Andreica

    2011-09-01

    Full Text Available This paper presents modern solutions for the automation of the electrical traction power supply system used in urban public transport (trams, trolleybuses and subway trains. The monitoring and control of this process uses SCADA distributed architectures, grouped around a central point (dispatcher who controls all field sensors, transmitters and actuators using programmable logical controllers. The presented applications refer to the Bucharest electrical transport infrastructure.

  4. Design and performance of General Electric boiling water reactor main steam line isolation valves

    International Nuclear Information System (INIS)

    Rockwell, D.A.; van Zylstra, E.H.

    1976-08-01

    An extensive test program has been completed by the General Electric Company in cooperation with the Commonwealth Edison Company on the basic design type of large main steam line isolation valves used on General Electric Boiling Water Reactors. Based on a total of 40 tests under simulated accident conditions covering a wide range of mass flows, mixture qualities, and closing times, it was concluded that the commercially available valves of this basic type will close completely and reliably as required. Analytical methods to predict transient effects in the steam line and valve after postulated breaks were refined and confirmed by the test program

  5. The integrated North American electricity market : investment in electricity infrastructure and supply : a North American concern

    International Nuclear Information System (INIS)

    Egan, T.

    2006-03-01

    Electricity supply and infrastructure solutions for the United States and Canada were discussed along with the availability of fuel supply and the diversity of fuel sources. This document focuses on investment in transmission infrastructure in order to assure sustainable generation sources for both countries while addressing constraints along the border, which will allow for enhanced cross-border trade. The Canadian Electricity Association has proposed 3 areas of bi-national cooperation to promote effective investment in electricity infrastructure and supply in the North American market: (1) cooperation in enhancing electricity supply, (2) cooperation in enhancing transmission infrastructure, and (3) cooperation in addressing air quality issues and climate change. The report discussed electricity generation by fuel source in Canada and the United States; status of restructuring in Canada; as well as the economic and environmental benefits of an integrated market. It also discussed regulatory and policy matters affecting the investment environment. Last, it discussed the need for opportunities for investment in the North American market, distribution and demand side measures, and cooperation in enhancing transmission infrastructure. It was concluded that growing electricity demand in both the United States and Canada requires investment in electricity infrastructure and supply in the future. Resolving electricity infrastructure and supply needs must be an international concern, requiring the full engagement and cooperation of both countries. 1 tab, 2 figs

  6. Electricity supply industry. Structure, ownership and regulation in OECD countries

    International Nuclear Information System (INIS)

    1994-01-01

    This study surveys developments and implications in the electricity supply industries in OECD countries. Chapter 1 introduces the issues. (Competition or electricity supply for everybody?) Electricity markets are dynamic and the participants are restructuring and repositioning themselves in order to benefit from new opportunities or policy initiatives. These changes are described in chapter 2. Privatisation is being pursued by some governments, not only for reasons of economic efficiency. Arguments for and against privatisation and different ways of introducing it are discussed in chapter 3. Fair trade and competition legislation, as it applies to all corporate entities, creates the institutional framework within which the utility has to operate. Various approaches to regulation and recent developments are described in chapter 4; the implications of regulatory changes are analysed in chapter 5. Having surveyed recent developments and their direct consequences, this study then goes on to look at their broader implications for the achievement of a range of energy policy objectives. Chapter 6 looks at fuel choice and investment decisions. Chapter 7 considers the issue of security of electricity supply, which has many special characteristics for both suppliers and regulators. OECD countries use different approaches for ensuring security of supply. Chapter 8 looks at environmental protection. Chapter 9 looks at energy efficiency. Chapter 10 discusses pricing. The introduction of competition has significant effects: it tends to reduce costs, remove cross subsidies, and bring prices more closely in line with the structure of costs. But there is no clear evidence at this stage as to whether, in the long run, competition produces lower overall prices. Finally chapter 11 analyses risk. The electricity business, like every other business, is faced with a variety of risks that cover every financial and technical facet of electricity production, transport, and supply. (N.C.)

  7. Least cost planning within the service concept of power supply companies

    International Nuclear Information System (INIS)

    Lueschen, H.; Sonntag, J.; Werner, R.

    1995-01-01

    In discussing the implementation of energy service concepts, German power supply companies are gradually adopting categories originating from the USA, namely integrated resources planning (IRP), least cost planning (LCP), and demand-side management (DSM). While the activities of German power supply companies are more encompassing than those of their US counterparts in the traditional features of DSM such as load management, information, and consulting, further-going measures such as direct investment and financial incentive programmes for exploiting energy-saving potentials play a less important role and are controversial in the energy-political debate. The article presents the concept of power supply companies for implementing IRP/LCP and makes a concrete assessment of the worth and efficiency of consulting compared with the newer type of financial incentive programmes. (orig.) [de

  8. SUPPLY –CHAIN AND LOGIC MODELS FOR THE TEXTILE AND CLOTHING COMPANIES

    Directory of Open Access Journals (Sweden)

    VISILEANU Emilia

    2014-05-01

    Full Text Available The textile and clothing industry is characterized by specific supply-chain models with companies situated in a complex cluster type structure. Depending on the size, the volume and the variety of production, companies can be classified as follows: large companies, griffes, medium size companies and subcontracting companies. The logic of companies is defined by the main feature of the textile and clothing field, namely the logic of collections, determined by the seasonality and classified into several types: planning, fast-fashion, fast fashion/ planning. The market share defined by stylistic content, product quality and price determine their typology: mass-market, bridge, diffusion, prêt-a-porter/haute-couture. The study conducted on a number of companies in the textile-clothing industry revealed the following: high share of SMEs (75%, dominant role of garments in the production (74.5%, fast-fashion logic of imitating companies is predominant (94% and mass-market type products have the highest market share (71%. Success in national and international challenges that must be faced by the textile - clothing sector: complete liberalization of world trade, the implementation of quality standards, the adoption of the EU Customs Code and relocation can be provided only by changing the supply -chain models and business strategies with a focus on short series products with high customization and fictionalization, new models of e-commerce services, e-business, etc

  9. ASCERTAINMENT OF ELECTRIC-SUPPLY SCHEMES RELIABILITY FOR THE ATOMIC POWER PLANT AUXILIARIES

    Directory of Open Access Journals (Sweden)

    A. L. Starzhinskij

    2015-01-01

    Full Text Available The paper completes ascertainment of electrical-supply scheme reliability for the auxiliaries of a nuclear power plant. Thereat the author considers the system behavior during the block normal operation, carrying out current maintenance, and capital repairs in combination with initiating events. The initiating events for reactors include complete blackout, i.e. the loss of outside power supply (normal and reserve; emergency switching one of the working turbogenerators; momentary dumping the normal rating to the level of auxiliaries with seating the cutout valve of one turbo-generator. The combination of any initiating event with the repairing mode in case of one of the system elements failure should not lead to blackout occurrence of more than one system of the reliable power supply. This requirement rests content with the help of the reliable power supply system self-dependence (electrical and functional and the emergency power-supply operational autonomy (diesel generator and accumulator batteries.The reliability indicators of the power supply system for the nuclear power plant auxiliaries are the conditional probabilities of conjoined blackout of one, two, and three sections of the reliable power supply conditional upon an initiating event emerging and the blackout of one, two, and three reliable power-supply sections under the normal operational mode. Furthermore, they also are the blackout periodicity of one and conjointly two, three, and four sections of normal operation under the block normal operational mode. It is established that the blackout of one bus section of normal operation and one section of reliable power-supply system of the auxiliaries that does not lead to complete blackout of the plant auxiliaries may occur once in three years. The probability of simultaneous power failure of two or three normal-operation sections and of two reliable power-supply sections during the power plant service life is unlikely.

  10. Environmental inventories for future electricity supply systems for Switzerland

    International Nuclear Information System (INIS)

    Dones, R.; Gantner, U.; Hirschberg, S.; Doka, G.; Knoepfel, I.

    1996-02-01

    This report provides the analysis of environmental inventories for selected electricity supply systems considered as possible options to meet the expected electricity demand in Switzerland in year 2030. The work was carried out by the Paul Scherrer Institute (PSI) and the Swiss Federal Institute of Technology Zurich (ETHZ), and was supported by the Swiss Association of Producers and Distributers of Electricity (VSE). Two possible electricity demand level cases were postulated by VSE, both under the basic assumption of economic growth: a high-growth demand case corresponding to a yearly increase of 2% from year 1995 to year 2010 and 1% from year 2010 to year 2030, and a low-growth demand case corresponding to a yearly increase of 1% from year 1995 to year 2010 and 0.5% from year 2010 to year 2030. The base (i.e. secured) supply in year 2030 will be, according to VSE, totally dominated by hydro with rather minor contributions from combined heat-and-power plants, small gas turbines, incinerators and solar photovoltaic plants. Due to decommissioning of the currently operating nuclear power plants and expiration of long-term electricity import contracts there will eventually occur a gap between the postulated electricity demand and the base supply. VSE provided seven options to cover this gap, defined in terms of mixes with different contributions from gas, coal, nuclear and solar chains; in this context a distinction is also made with respect to shares of domestic and imported electricity. The systems considered represent advanced technologies, regarded as either typical or most suitable for the Swiss conditions. System-specific input to the present analysis has been partially generated based on direct contacts with the industry. Life Cycle Analysis (LCA) was used to establish environmental inventories for the systems analysed. The analysis has been performed on three levels: 1) individually for each system considered, 2) comparison of systems, 3) comparison of supply

  11. The electricity supply industry as a subject for public criticism

    International Nuclear Information System (INIS)

    Bartsch, R.

    1977-01-01

    The German electricity supply industry is becoming the subject for more public criticism although it has supplied the whole population and industry in recent years with electricity without limitations and at a favourable price. In spite of the satisfactory and exemplary achievements of this branch of the economy a wave of criticism has built up, caused by the increase in nuclear power station construction, and this is assuming greater proportions and includes wider fields. This situation requires a matching publicity campaign in a number of directions which must be preceded by comprehensive research into causes. It is urgently necessary to achieve a realisation of the basic questions in this branch of the economy in all those, engaged in electricity supply. Full information on the special physical characteristics of the electricity produced, with all the consequences which follow from these, must be supplied to the relevant groups in society both within and outside the economy and also to the mass media, together with continuous efforts to gain the trust of the public. (orig.) [de

  12. Electricity, Gas and Water Supply. Industry Training Monograph No. 4.

    Science.gov (United States)

    Dumbrell, Tom

    Australia's electricity, gas, and water supply industry employs only 0.8% of the nation's workers and employment in the industry has declined by nearly 39% in the last decade. This industry is substantially more dependent on the vocational education and training (VET) sector for skilled graduates than is the total Australian labor market. Despite…

  13. A Factorial Study of Electricity Supply in Nigeria | Igboanugo ...

    African Journals Online (AJOL)

    This paper weighs up a number of variables vitiating electricity supply in Nigeria, and offers increased insight and awareness about their insidiousness. The study employed a survey approach, using the Rensis Likert's attitudinal scale, to generate respondents' data matrix that was analyzed with Principal Component ...

  14. Electricity supply enterprises: Profits in comparison between industries

    International Nuclear Information System (INIS)

    Kuehnl, U.

    1995-01-01

    The acquisition of participations by major electricity supply enterprises during the last years met with strong criticism from the general public and revived the controversial discussion about electricity prices and profits. Yet the electricity industry is subject to specific legal price controls guaranteeing a price formation that is cost-economical, just and fair under the causation principle and does not permit excessive profits. Under this aspect and against the background of discussing this issue on an economic basis the author presents an empirical survey. (orig.)

  15. Specific properties of the electrical equipment in the nuclear steam supply system; Specificnosti elektricne opreme u primarnom djelu nuklearne elektrane

    Energy Technology Data Exchange (ETDEWEB)

    Smiljanic, D [Rade Koncar Institut, Zagreb (Yugoslavia)

    1979-07-01

    The paper presents description of reactor coolant pump motor in the primary coolant loop. The motor is treated as a representative of all electrical equipment in the nuclear steam supply system that has to meet all the requirements concerning reliability, minimum maintenance, radiation, seismic etc. (author)

  16. Market-price-based calculation and control of profit contributions in energy supply companies; Marktpreisbasierte Kalkulation und Steuerung von Ergebnisbeitraegen in Energieversorgungsunternehmen

    Energy Technology Data Exchange (ETDEWEB)

    Brehme, Annett

    2013-08-01

    As a result of the liberalisation of the electricity markets starting in the 1990s energy supply companies are confronted with the task of implementing some means of profit centre control along with a suitable risk management system for the business areas production, trade and marketing. Traditionally results accounting and profitability analysis are still done using the cost plus method. However this method does not do justice to the fact that power plant deployment and the marketing department's task of offer pricing have to be geared to wholesale prices. This has led the author to develop a market-price-based calculation and control concept for energy supply companies.

  17. Optimal pricing of transmission and distribution services in electricity supply

    International Nuclear Information System (INIS)

    Farmer, E.D.; Cory, B.J.; Perera, B.L.P.P.

    1995-01-01

    A new strategy for the separate pricing of transmission and distribution services in electricity supply is formulated and evaluated. The proposed methodology is a multivariate transmission generalisation of the method of peak load pricing previously applied to the optimal time-of-use pricing of generation on a power system with diverse generation technologies and with elastic demand. The method allocates both capacity and operational costs on a time-of-use basis, in an optimal manner, that avoids cross-subsidisation both between differing supply system participants and differing times of usage. The method is shown to promote the optimal development of the transmission, distribution or interconnecting systems, rewarding justified investments in transmission capacity and discouraging overinvestment. It also leads to appropriate returns on invested capital without significant 'revenue reconciliation'. This contrasts with SRMC pricing as is shown by a comparative revenue evaluation. It is concluded that the method has wide potential application in electricity supply. (author)

  18. Logistics competencies of polish companies as a factor of development of virtual supply chains

    Directory of Open Access Journals (Sweden)

    2010-03-01

    Full Text Available Problems of virtual organizations have not been well elaborated yet. There are many different concepts in that area. The concept of virtual organization can be formulated on the basis of its characteristic features. Generally, the following features have been indicated: temporary character, focusing on customers, geographical dispersion, intensive use of computer technologies, network organization and use of core competencies of the members. An example of virtual organization could be found in, so called, virtual supply chain, which demonstrates high degree of flexibility and is capable of easy adjustment to dynamic markets. Advanced logistics competencies of companies functioning in that supply chain and their ability to integrate closely with suppliers and customers become the basis of virtual supply chains operations. This paper presents the results of research in the group of Polish companies. As the result of the research more specific picture of the abilities of companies for their operation in virtual (extra-flexible supply chains has been presented. From the point of view of the use of alternative tools for logistics management, logistics providers seem to be the group of firms being the most opened for cooperation. It results directly from the profile of their market operations. Finally, a conclusion might be drawn that a growth of flexibility of virtual supply chains demands more profound specialization of companies constituting links of those chains.

  19. Electricity and gas supplies under pressure. 2005 winter

    International Nuclear Information System (INIS)

    Lewiner, C.; David, P.; Coquet, P.

    2005-10-01

    Point of view on the demand for electricity and gas in light of European deregulation in 2005. Demand for electricity and gas by consumers and businesses soared to record highs as temperatures continued to fall steeply across Europe in January and February 2005. While unexpected seasonal trends have always had a major impact on electricity and gas supplies, this time, it occurred at a time when deregulation across all European markets is bringing new complexity notably in pricing and availability of supply. So what conclusions can be drawn from this acute market situation? Is deregulation delivering what it promised? What are the possible impacts on the business model of suppliers? What trends are we likely to observe in response to the challenges of operating in the new deregulated market place?

  20. RETRAN experience with BWR transients at Yankee Atomic Electric Company

    International Nuclear Information System (INIS)

    Ansari, A.A.F.; Cronin, J.T.; Slifer, B.C.

    1981-01-01

    Yankee Atomic Electric Company is actively involved in the development of licensing methods for BWR's. The computer code chosen for analyzing system response under transient conditions is RETRAN. This paper describes the RETRAN model developed for Vermont Yankee, and the results of the RETRAN checkout and qualification that has been achieved at YAEC through comparison of RETRAN predictions to the startup test results performed at the plant as part of the 100% power startup test program. In addition, abnormal operational transients typically analyzed for licensing are also presented

  1. Means of control of the public authorities as participants in public limited energy supply companies

    International Nuclear Information System (INIS)

    Kermel, C.

    1994-01-01

    Despite the fundamental studies by Emmerich and Puettner, the control of publicly owned companies by the state as a majority shareholder has not evolved to a generally accepted form. With a mind to the discussion on a nuclear phase-out at Hamburgische Electrizitaetswerke AG the author examines the scope offered by the law on public limited companies for realising the interests of the state as a shareholder. She arrives at interesting conclusions regarding the means to this end and the legal consequences of a phase-out decision. Lower supply companies are an ideal object of study for the purposes of this work. (orig./UA) [de

  2. Environmental inventories for future electricity supply systems for Switzerland

    Energy Technology Data Exchange (ETDEWEB)

    Dones, R; Gantner, U; Hirschberg, S [Paul Scherrer Inst. (PSI), Villigen (Switzerland); Doka, G; Knoepfel, I [Eidgenoessische Technische Hochschule, Zurich (Switzerland)

    1996-02-01

    This report provides the analysis of environmental inventories for selected electricity supply systems considered as possible options to meet the expected electricity demand in Switzerland in year 2030. Two possible electricity demand level cases were postulated by VSE, both under the basic assumption of economic growth: a high-growth demand case corresponding to a yearly increase of 2% from year 1995 to year 2010 and 1% from year 2010 to year 2030, and a low-growth demand case corresponding to a yearly increase of 1% from year 1995 to year 2010 and 0.5% from year 2010 to year 2030. The base (i.e. secured) supply in year 2030 will be, according to VSE, totally dominated by hydro with rather minor contributions from combined heat-and-power plants, small gas turbines, incinerators and solar photovoltaic plants. Due to decommissioning of the currently operating nuclear power plants and expiration of long-term electricity import contracts there will eventually occur a gap between the postulated electricity demand and the base supply. VSE provided seven options to cover this gap, defined in terms of mixes with different contributions from gas, coal, nuclear and solar chains; in this context a distinction is also made with respect to shares of domestic and imported electricity. The systems considered represent advanced technologies, regarded as either typical or most suitable for the Swiss conditions. System-specific input to the present analysis has been partially generated based on direct contacts with the industry. Life Cycle Analysis (LCA) was used to establish environmental inventories for the systems analysed. The analysis has been performed on three levels:(1) individually for each system considered, (2) comparison of systems, (3) comparison of supply options. Results are also provided for these three levels.

  3. The relationship between supply chain management strategy, marketing, logistics and company performance for breweries in Serbia

    Directory of Open Access Journals (Sweden)

    Ilić Dragan

    2016-01-01

    Full Text Available The objective of this research is to demonstrate the importance of supply chain management strategy, logistics and marketing to overall company performance. We considered supply chain management strategy based on universality and integration, i.e., their company performance will be increased with implementing this strategy in breweries in Serbia. The strategy based on the universality and integration includes three parts: universality and integration with customers, suppliers, and in intra-organizational processes and activities. In this paper, logistics performance called fundamental item for evaluating supply chain management strategy performance. All managers in breweries in Serbia are considered as subjects of this study. A number of 110 managers are selected as sample through random sampling method. The present study carried out through the use of questionnaire and SPSS software, correlation statistics test and multiple regressions have also been used for the data analysis. The results of correlation test showed that supply chain management strategy has significant relationship with the logistics performance and company performance and has the highest relationship and correlation with the logistics performance. Due to the observance to the multiple regression results, we found that performance of the breweries feel the highest effect from marketing performance and marketing performance also feels the highest effect from the logistics performance and consequently, implementation of supply chain management strategy is obtained. So, it can be said that organizational performance is increased as a result of implementation of supply chain management strategy.

  4. DAMES. A datafile for the macro-emissions of the Dutch electricity supply in 1995, 1998, 2010, 2020, and 2030

    International Nuclear Information System (INIS)

    Gijsen, A.; Spakman, J.

    2001-02-01

    This report describes the datafile DAMES (Dutch abbreviation for Database Macro-emissions of the Electricity Sector). DAMES offers an overall view of the Netherlands' electricity supply and it's attendant emissions of CO2, NOx and SO2. It incorporates results from different sources: (1) monitoring reports on production and emissions from central power plants, (2) an electricity supply model for future years and (3) a database with actual and future emission factors. In DAMES, the electricity supply has been divided into contributions from: central production (electricity produced by companies producing electricity as core business), decentralized production (electricity produced by companies producing electricity as by-product) and the import balance. Within these three 'subsectors', DAMES calculates production and emissions on the level of installation types. For combined heat and power production (CHP-installations), DAMES allocates a distinct fraction of the total emissions to the produced electricity. DAMES calculates aggregated emissions per kWh, an indicator that is often used in calculations on effectiveness measures. Furthermore, DAMES has an advantage over previous used instruments that it gives an integral overview of the effect of the fuel-mix, CHP, imports and the part of sustainable energy sources. DAMES has been applied on the years 1995/1998 and the future years 2010, 2020 and 2030. For the future years, prognoses have been used from two different scenarios of the CPB (Dutch Central Planning Bureau). These scenarios are called Global Competition and European Coordination. 18 refs

  5. Efficiency and regulation of the Slovenian electricity distribution companies

    International Nuclear Information System (INIS)

    Filippini, Massimo; Hrovatin, Nevenka; Zoric, Jelena

    2004-01-01

    The Slovenian Energy Law, adopted in 1999, has opened the internal market to competition up to 64% of the final consumption. The opening of the internal market to foreign competition is envisaged for 2003. With regard to the methodology of price regulation, the Energy Law introduces the 'price-cap' regulation, which aims to give firms incentive for cost reduction. To provide information for effective price regulation, we estimated a cost frontier function on a sample of Slovenian electricity distribution utilities over the 1991-2000 period. The estimated efficient frontier could be used by Slovenian regulatory agency as a benchmark to regulate network access prices. Our results show that Slovenian distribution companies are cost inefficient. We have also proved the presence of increasing returns to scale with most utilities not achieving the minimum efficient scale. Thus, the Slovenian regulatory authority should consider how to induce mergers of small electricity distribution utilities into larger units

  6. Multi utility - a successful conception for energy supply companies?; Multi-Utility - Erfolgskonzept fuer Energieversorger? Zusammenwachsen der Maerkte

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, C. [LBD-Beratungsgesellschaft mbH, Berlin (Germany)

    2003-06-02

    Multi-utility is seen as the most promising marketing strategy for energy companies. In the future, experts say, only the combined supply of electricity, natural gas, water, waste management and services will allow companies to grow. But are today's multi-utility-products answering the needs of the customers? The author goes further into this question and finds the answer: Multi-utility needs to be further developed. Only products from growth and competition markets can generate additional margins. (orig.) [German] Multi-Utility gilt als die Marketingstrategie fuer Energieversorger. Nur wer zukuenftig Strom, Gas, Wasser, Entsorgung und Service aus einer Hand anbietet, heisst es in der Branche, kann im Markt wachsen. Doch inwieweit entspricht das heutige Multi-Utility-Angebot wirklich dem Kundenbeduerfnis? Die Verfasserin geht dieser Frage nach und kommt zu dem Schluss: Die Multi-Utility-Palette muss weiterentwickelt werden. Nur mit Produkten aus Wachstums- und Wettbewerbsmaerkten kann zusaetzliche Marge generiert werden. (orig.)

  7. Electrical insulator requirements for mirror fusion reactors

    International Nuclear Information System (INIS)

    Condit, R.H.; Van Konynenburg, R.A.

    1977-01-01

    The requirements for mirror fusion electrical insulators are discussed. Insulators will be required at the neutral beam injectors, injector power supplies, direct converters, and superconducting magnets. Insulators placed at the neutral beam injectors will receive the greatest radiation exposure, 10 14 to 10 16 neutrons/m 2 .s and 0.3 to 3 Gy/s (10 5 to 10 6 R/h) of gamma rays, with shielding. Direct converter insulators may receive the highest temperature (up to 1300 0 K), but low voltage holding requirements. Insulators made from organic materials (e.g., plastics) for the magnet coils may be satisfactory. Immediate conductivity increases of all insulators result from gamma irradiation. With an upper limit to gamma flux exposures of 300 Gy/s in a minimally shielded region, the conductivity could reach 10 -6 S/m. Damage from neutron irradiation may not be serious during several years' exposure. Surface changes in ceramics at the neutral beam injector may be serious. The interior of the injector will contain atomic hydrogen, and sputtering may transfer material away from or onto the ceramic insulators. Unknown and potentially damaging interactions between irradiation, electric fields, temperature gradients, cycling of temperature, surface and joint reactions, sputtering, polarization, and electrotransport in the dielectrics are of concern. Materials research to deal with these problems is needed

  8. Strategies for regional integration of electricity supply in West Africa

    International Nuclear Information System (INIS)

    Gnansounou, Edgard; Bayem, Herman; Bednyagin, Denis; Dong, Jun

    2007-01-01

    To improve peoples' living conditions in West African countries national governments have to considerably reinforce the electricity supply infrastructures. Rehabilitation of the existing installations and construction of new power generation facilities and transmission lines require substantial resources which are tremendously difficult to raise due to the region's specific economical and political conditions. This paper examines the long-term prospects for integrated development of the regional electricity industry and evaluates its advantages by using PLANELEC-Pro, a 'bottom-up' electricity system expansion planning optimisation model. The evolution of regional electricity market is analysed on the basis of two strategies. The 'autarkical' strategy consists in adequate expansion of national power generation systems and the exchanges of electricity between the countries in sub-zones. Another approach referred to as 'integration' strategy is recommended in this article. It leads to fast retirement of the obsolete power plants and the integration of new investment projects at the level of whole West African sub-region. The main finding is that the regional integration strategy is capable to bring about additional benefits in terms of reduced capital expenditures, lower electricity supply cost and the enhanced system's reliability compared to the autarkical strategy

  9. 46 CFR 63.25-3 - Electric hot water supply boilers.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Electric hot water supply boilers. 63.25-3 Section 63.25... water supply boilers. (a) Electric hot water supply boilers that have a capacity not greater than 454... section except the periodic testing required by paragraph (j) of this section. Electric hot water supply...

  10. Proposal of space reactor for nuclear electric propulsion system

    International Nuclear Information System (INIS)

    Nishiyama, Takaaki; Nagata, Hidetaka; Nakashima, Hideki

    2009-01-01

    A nuclear reactor installed in spacecrafts is considered here. The nuclear reactor could stably provide an enough amount of electric power in deep space missions. Most of the nuclear reactors that have been developed up to now in the United States and the former Soviet Union have used uranium with 90% enrichment of 235 U as a fuel. On the other hand, in Japan, because the uranium that can be used is enriched to below 20%, the miniaturization of the reactor core is difficult. A Light-water nuclear reactor is an exception that could make the reactor core small. Then, the reactor core composition and characteristic are evaluated for the cases with the enrichment of the uranium fuel as 20%. We take up here Graphite reactor, Light-water reactor, and Sodium-cooled one. (author)

  11. Fuel cells and electricity companies - new risk management opportunities

    International Nuclear Information System (INIS)

    Whale, M.

    2004-01-01

    'Full text:' Deregulation, distributed generation, combined heat and power, renewables, fuel cells, hydrogen. Power companies are facing a rapidly evolving environment that is testing their ability to effectively deploy capital and earn profits. While recent deregulation trends have shifted the structure of power markets into separating generators from distributors, the improving economic value proposition offered by smaller scale distributed generation technologies - such as fuel cells - would seem to be a conflicting development. In this complex and changing environment, decisions based on the economic reality of the capital markets are likely to prevail. By examining the opportunity to enhance risk management offered by stationary fuel cells, particularly in CHP applications, we provide a context for the issues being discussed in today's sessions focusing on power companies and electric utilities. Our risk management perspective suggests a pathway for implementing fuel cells in combined heat and power applications that large power generators can introduce in increasingly smaller sizes. With capital costs of fuel cells high and risk tolerance of power companies low, the challenge for smaller technology developers will be to reduce the apparently long time horizon that persists for substantial deployment. (author)

  12. Regulatory Impacts on Sustainable Drinking Water Supply: A Comparative Study on Dutch Water Companies

    NARCIS (Netherlands)

    Dalhuisen, J.M.; Nijkamp, P.

    2006-01-01

    Regulatory changes have exerted deep impacts on public service provision. This paper aims to disentangle recent differences in the external production circumstances of Dutch regional water companies in order to identify the crucial regulatory factors influencing the supply of water to various users

  13. Regulatory Impacts on Sustainable Drinking Water Supply: A Comparative Study on Dutch Water Companies

    NARCIS (Netherlands)

    Dalhuisen, J.M.; Nijkamp, P.

    2007-01-01

    Regulatory changes have exerted deep impacts on public service provision. This paper aims to disentangle recent differences in the external production circumstances of Dutch regional water companies in order to identify the crucial regulatory factors influencing the supply of water to various users

  14. The participation of foreign supply companies in the promotion of solar heating systems

    International Nuclear Information System (INIS)

    Larsen, J.H.; Tveit, D.

    1995-06-01

    The extent of participation on the part of energy supply companies located in Germany, the Netherlands, Brazil and USA in the promotion of solar heating systems is investigated and various promotion projects carried out in these countries are described in detail. (AB)

  15. Questions of the day in the electricity supply industry

    Energy Technology Data Exchange (ETDEWEB)

    Schenk, P [Vereinigung Deutscher Elektrizitaetswerke e.V. (VDEW), Frankfurt am Main (Germany, F.R.)

    1977-06-01

    The author deals with the especially important points that have given rise to the situation in the German electricity supply industry since the oil-price crisis, and in particular in the year 1976. He then turns to the present urgent problems facing the supply industry. The following are discussed: the energy program; meeting the power demand; nuclear energy from licensing up to the disposal of the waste material; use of conventional power stations; actions by associations/initiatives; saving of energy; promotion of energy consumption by advertising; and power/heat coupling.

  16. National Account Energy Alliance Final Report for the Basin Electric Project at Northern Border Pipeline Company's Compressor Station #7, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    Sweetzer, Richard [Exergy Partners Corp.; Leslie, Neil [Gas Technology Institute

    2008-02-01

    A field research test and verification project was conducted at the recovered energy generation plant at Northern Border Pipeline Company Compressor Station #7 (CS#7) near St. Anthony. Recovered energy generation plant equipment was supplied and installed by ORMAT Technologies, Inc. Basin Electric is purchasing the electricity under a purchase power agreement with an ORMAT subsidiary, which owns and operates the plant.

  17. Supply air filters after the nuclear reactor accident at Chernobyl

    International Nuclear Information System (INIS)

    Bonka, H.

    1989-01-01

    In the case of increased activity concentration in the air supply air filters are the facility compounds where enhanced activity is collected. Therefore, it was understandable that the people put questions about the doses caused by supply air filters after the nuclear reactor accident at Chernobyl. When comparing the local dose rate at a distance of 1 m in front of filters with the outdoor local dose rate due to dry deposited radionuclides, nearly the same local dose rate results assuming an air flow rate of approx. 60 m 3 /h. Supposing a 10 hours stay at a distance of 1 m in front of filters and an air flow rate of approx. 5000 m 3 /h the same dose is obtained after a 10 days delay as the dose due to outdoor inhalation. At Aachen, the local dose rate near to filters increased up to approx. 10 μSv/h. After a suitable time delay of one month filters could be rejected like normal waste. A review is given on individual measured values

  18. Security of the electricity supply. The area of conflict between profitability and environmental compatibility

    International Nuclear Information System (INIS)

    Praktiknjo, Aaron

    2013-01-01

    The scope of the book is on the one hand support for the power industry defining investment and sales strategies that intend optimum supply security in the view of the customer and on the other hand the information for energy and environmental politicians demonstrating the conflict of objectives. The following issues are covered: technical and organizational aspects of electricity supply, theoretical background of the security of electricity supply, security of supply for economic sections, security of electricity supply for private households: theoretical microeconomic approach, security of electricity supply for private households: method of defined preferences, security of electricity supply in the context of climate protection and nuclear phase-out.

  19. State of Implementation of Supply Chain Management in Companies in Romania

    Directory of Open Access Journals (Sweden)

    Mihaela Dobrea

    2013-02-01

    Full Text Available The aim of this study was to assess the degree of supply chain management`s development in Romanian companies. For this, a selective, explorative survey, on a sample of 225 Romanian companies was used. The objectives of the research focused on highlighting the importance of logistics in the companies’ management and on identifying specific issues related to supply chain management - role, objectives, predisposing factors, applications. From the research, it was found that supply chain management is at an early stage of development, specifically for the 80s and 90s. In addition, there is insufficient awareness that SCM is a tool for increasing business performance and competitiveness in the global market. The value of the study is given also by the fact that it is a pioneering work in Romania, where there were little such researches, especially in PhD thesis.

  20. Electricity

    International Nuclear Information System (INIS)

    Tombs, F.

    1983-01-01

    The subject is discussed, with particular reference to the electricity industry in the United Kingdom, under the headings; importance and scope of the industry's work; future fuel supplies (estimated indigenous fossil fuels reserves); outlook for UK energy supplies; problems of future generating capacity and fuel mix (energy policy; construction programme; economics and pricing; contribution of nuclear power - thermal and fast reactors; problems of conversion of oil-burning to coal-burning plant). (U.K.)

  1. The inquiry into electricity supply in New South Wales

    International Nuclear Information System (INIS)

    Owen, Anthony D.

    2009-01-01

    In May 2007, the Premier of New South Wales (NSW) announced the establishment of an Inquiry into Electricity Supply in that State to be undertaken by the author of this paper. Fundamental to the Inquiry was the perceived need for additional baseload generating capacity, the identification of the available technologies, carbon constraints and the policy options that would encourage the private sector to undertake the required investments. Although NSW is part of the competitive National Electricity Market, State-owned generators dominate baseload supply. In addition, the State operates three electricity retailing businesses, has a monopoly on transmission and distribution, and provides price stability for NSW residential consumers through the Electricity Tariff Equalisation Fund. Overall, therefore, the State dominates the industry and, not surprisingly, potential private investors are sceptical that its market roles may be based upon criteria other than the purely commercial. The Inquiry's report, which was publicly released in September 2007, recommended sale of all State assets in both electricity generation and retail. This paper provides a rationale for that recommendation

  2. The inquiry into electricity supply in New South Wales

    Energy Technology Data Exchange (ETDEWEB)

    Owen, Anthony D. [School of Economics and Finance, Curtin Business School, Curtin University of Technology, Perth, WA 6845 (Australia)

    2009-02-15

    In May 2007, the Premier of New South Wales (NSW) announced the establishment of an Inquiry into Electricity Supply in that State to be undertaken by the author of this paper. Fundamental to the Inquiry was the perceived need for additional baseload generating capacity, the identification of the available technologies, carbon constraints and the policy options that would encourage the private sector to undertake the required investments. Although NSW is part of the competitive National Electricity Market, State-owned generators dominate baseload supply. In addition, the State operates three electricity retailing businesses, has a monopoly on transmission and distribution, and provides price stability for NSW residential consumers through the Electricity Tariff Equalisation Fund. Overall, therefore, the State dominates the industry and, not surprisingly, potential private investors are sceptical that its market roles may be based upon criteria other than the purely commercial. The Inquiry's report, which was publicly released in September 2007, recommended sale of all State assets in both electricity generation and retail. This paper provides a rationale for that recommendation. (author)

  3. 75 FR 54618 - CAlifornians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern...

    Science.gov (United States)

    2010-09-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-84-000] CAlifornians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities Commission; Notice of Complaint...

  4. 75 FR 66744 - Californians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern...

    Science.gov (United States)

    2010-10-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-84-001] Californians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities Commission; Notice of Amended...

  5. Grappling with Change: The South African Electricity Supply Industry

    Energy Technology Data Exchange (ETDEWEB)

    Galen, P. S.

    1998-11-01

    This paper reviews the debate over the future structure of the South African electricity supply industry (ESI) with focus on the electricity distribution industry (EDI) segment. The importance of both new and old institutions in the ESI in facilitating change is discussed. The perspective is that of an outside observer who spent nearly 2 years following events in the South African ESI. The ESI situation reviewed here is very complex and connected to a myriad of other economic, financial, cultural, social, and political issues.

  6. Grappling with Change: The South African Electricity Supply Industry

    International Nuclear Information System (INIS)

    Galen, Paul S.

    1998-01-01

    This paper reviews the debate over the future structure of the South African electricity supply industry (ESI) with focus on the electricity distribution industry (EDI) segment. The importance of both new and old institutions in the ESI in facilitating change is discussed. The perspective is that of an outside observer who spent nearly 2 years following events in the South African ESI. The ESI situation reviewed here is very complex and connected to a myriad of other economic, financial, cultural, social, and political issues

  7. An undertaking planning game for the electricity supply industry

    International Nuclear Information System (INIS)

    Troescher, H.

    1977-01-01

    Planning games have been found satisfactory in many field in political and economic life. In particular the more convenient access to electronic calculators has made a contrinution to their wider use. It is therefore surprising that the first planning game which has become known for the electricity supply industry was first published in the year 1975. This is the planning game for the Bernischen Kraftwerke AG, which is based on a simplified model of a small electricity supply undertaking (EVU). This planning game was adapted in the RWE to the conditions in larger EVU and a few additional model components were added. Besides the general points of view on planning games for EVU the author deals with the extended planning game which is termed in the article PEW. (orig.) [de

  8. Job Satisfaction for Employees: Evidence from Karachi Electric Supply Corporation

    OpenAIRE

    Frukh, Nousjheen; Herani, Gobind M.; Mohammad, Mahmud; Mohammad, Tariq

    2009-01-01

    Research has been conducted in order to critically evaluate and examine the level of employees’ satisfaction as well as the factors of dissatisfaction among the employees of Karachi Electric supply Corporation (KESC). The purpose of this study is also to observe and analyze the factors which create job dissatisfaction especially among the hardworking managers, and to find out the reasons which make them realize that they don not have a clear career path along working with KESC. The primary da...

  9. World energy resources, demand and supply of energy, and the prospects for the fast breeder reactor

    International Nuclear Information System (INIS)

    Haefele, W.

    1978-01-01

    In the past it was taken for granted that the prime role of fast breeder reactors was to complement light water reactors, mainly because of their similar and compatible fuel cycles. In particular, the plutonium converted in LWRs is most intelligently disposed of and used in FBRs. Evaluation of the time horizon of such reactor strategies generally extended only to the year 2000. It is important to realize, however, that the salient task in the breeder field after 2000 - besides electricity generation - will be to substitute for conventional ''cheap'' oil. Electricity today makes up only 10% to 12% of the total secondary energy, while liquids essentially command up to about 50%. Thus the future application of the FBR technology will have to be geared more to the production of a liquid secondary energy carrier than to electricity. A new yardstick for all these considerations is the strongly rising energy prices. They may double, for example, leading to an oil price of US 24/bbl. Under these circumstances it is prudent to generalize the scope for future fast breeders. The key element of such a new fast breeder strategy would be the production of hydrogen by electrolysis or thermolysis or a combination of both. For example, methanol synthesized from hydrogen and residual fossil fuels would thus become economically attractive. The FBR breeding gain, on the other hand, would be used for the continued supply of LWRs generating electricity. The paper identifies order-of-magnitude considerations most important for such a fast breeder application against a global energy demand scenario for the year 2030. (author)

  10. Models and strategies for electricity distribution companies in emerging economies

    Science.gov (United States)

    Zaragocin Espinosa, Leonardo Vicente

    Unbundling and privatization have become key elements of restructuring in the Electric Power Industry of Emerging Economies. These processes have concentrated on the Generation and Transmission areas, leaving Distribution as lower priority. Based on a comparison between the old role of Distribution Companies (DISCOS) and its new potential role this study identifies the main issues and challenges that DISCOS will face in the new environment once structural and ownership changes are completed. For the specific case of DISCOS in Emerging Economies, regulatory policies are reviewed and strategies identified in order to facilitate the transition and to assist in the integration of DISCOS with other agents in the evolving electric power market. Of particular importance in this research is the analysis of the role of Energy Efficiency (EE) in the new structural and governance environment. A theoretical study of the effects of energy efficiency measures, specifically loss reduction, on price regulation is developed within a proposed regulatory regime of privatization together with Price-Cap Regulation. This theoretical benchmark is then used as a starting point for a case study, the Electric System of Ecuador, where an analysis of the current Ecuadorian price regulation scheme (the Distribution Value Added Charge, VAD, scheme) is presented and analyzed in detail. General recommendations for improving the application of the VAD pricing approach are advanced, with special reference to the current situation in Ecuador.

  11. Supply adequacy in electricity markets based on hydro systems-the Brazilian case

    International Nuclear Information System (INIS)

    Luiz da Silva, Edson

    2006-01-01

    This article examines the practical perspective for introducing the deregulation model in systems with a strong predominance of hydroelectric generation, such as the Brazilian electricity system. In order to do this, the article describes the process of establishing short-term prices in systems with such characteristics, concluding that this economic signal is inefficient for stimulating a sustained generation expansion. As a result of this analysis, the article proposes, as a regulatory policy, a competitive process of energy contracting that favors the making of decisions with long-term horizons, ensuring the adequacy of supply, and, additionally, permitting a satisfactory management of market risk by generation and distribution companies. (author)

  12. Estimating zonal electricity supply curves in transmission-constrained electricity markets

    International Nuclear Information System (INIS)

    Sahraei-Ardakani, Mostafa; Blumsack, Seth; Kleit, Andrew

    2015-01-01

    Many important electricity policy initiatives would directly affect the operation of electric power networks. This paper develops a method for estimating short-run zonal supply curves in transmission-constrained electricity markets that can be implemented quickly by policy analysts with training in statistical methods and with publicly available data. Our model enables analysis of distributional impacts of policies affecting operation of electric power grid. The method uses fuel prices and zonal electric loads to determine piecewise supply curves, identifying zonal electricity price and marginal fuel. We illustrate our methodology by estimating zonal impacts of Pennsylvania's Act 129, an energy efficiency and conservation policy. For most utilities in Pennsylvania, Act 129 would reduce the influence of natural gas on electricity price formation and increase the influence of coal. The total resulted savings would be around 267 million dollars, 82 percent of which would be enjoyed by the customers in Pennsylvania. We also analyze the impacts of imposing a $35/ton tax on carbon dioxide emissions. Our results show that the policy would increase the average prices in PJM by 47–89 percent under different fuel price scenarios in the short run, and would lead to short-run interfuel substitution between natural gas and coal. - Highlights: • We develop a method to estimate of zonal supply curves in electricity markets. • The model estimates zonal electricity prices and zonal fuel utilization. • The model implicitly captures the average impacts of transmission constraints. • Using the method, we project supply curves for the seventeen utility zones of PJM. • We use the estimated supply curves to study the impacts of Pennsylvania's Act 129 and a carbon tax of $35 per ton

  13. Tool for the control management of electric and magnetic fields of electrical companies

    International Nuclear Information System (INIS)

    Arnera, Patricia; Barbieri, Beatriz

    2008-01-01

    The use of electricity involves a wide range of activities that, because of its diversity, characteristics and relative importance causes different environmental impacts during the extraction, processing, transport and consuming activities. It is the role of the government to elaborate the rules for the incorporation of environmental aspects in the different segments of the market for different electrical energy sources and in all the stages of the process, from the initial evaluation to the construction and exploitation phases. Among the environmental key aspects to considerate, are the electric and magnetic fields, in which society has taken special interest as they are believed to be involved in health hazard. The faculties of the regulatory authority are dictate regulations and technique procedures to be fulfilled by the agents, and check their compliance. In the course of time since the mentioned obligations, the authority has gathered information regarding electric and magnetic fields that includes those planned in the Companies Environmental Planning and those obtained ad-hoc in the role of controller. In order to systematize this information, a data base has been designed considering different types of electric installations, the company which they belong to, equipment used in the measurements, representative layouts with measure points and profiles of the electric and magnetic fields that were obtained. (author)

  14. Tool for the control management of electric and magnetic fields of electrical companies

    Energy Technology Data Exchange (ETDEWEB)

    Arnera, Patricia; Barbieri, Beatriz [La Plata Univ. Nacional (Argentina). Facultad de Ingenieria, Instituto de Investigaciones Tecnologicas para Redes y Equipos; Turco, Joaquin; Messina, Juan; Postiglioni, Osvaldo [Ente Nacional Regulador de la Electricidad, Buenos Aires (Argentina)

    2008-07-01

    The use of electricity involves a wide range of activities that, because of its diversity, characteristics and relative importance causes different environmental impacts during the extraction, processing, transport and consuming activities. It is the role of the government to elaborate the rules for the incorporation of environmental aspects in the different segments of the market for different electrical energy sources and in all the stages of the process, from the initial evaluation to the construction and exploitation phases. Among the environmental key aspects to considerate, are the electric and magnetic fields, in which society has taken special interest as they are believed to be involved in health hazard. The faculties of the regulatory authority are dictate regulations and technique procedures to be fulfilled by the agents, and check their compliance. In the course of time since the mentioned obligations, the authority has gathered information regarding electric and magnetic fields that includes those planned in the Companies Environmental Planning and those obtained ad-hoc in the role of controller. In order to systematize this information, a data base has been designed considering different types of electric installations, the company which they belong to, equipment used in the measurements, representative layouts with measure points and profiles of the electric and magnetic fields that were obtained. (author)

  15. Supply curve bidding of electricity in constrained power networks

    International Nuclear Information System (INIS)

    Al-Agtash, Salem Y.

    2010-01-01

    This paper presents a Supply Curve Bidding (SCB) approach that complies with the notion of the Standard Market Design (SMD) in electricity markets. The approach considers the demand-side option and Locational Marginal Pricing (LMP) clearing. It iteratively alters Supply Function Equilibria (SFE) model solutions, then choosing the best bid based on market-clearing LMP and network conditions. It has been argued that SCB better benefits suppliers compared to fixed quantity-price bids. It provides more flexibility and better opportunity to achieving profitable outcomes over a range of demands. In addition, SCB fits two important criteria: simplifies evaluating electricity derivatives and captures smooth marginal cost characteristics that reflect actual production costs. The simultaneous inclusion of physical unit constraints and transmission security constraints will assure a feasible solution. An IEEE 24-bus system is used to illustrate perturbations of SCB in constrained power networks within the framework of SDM. By searching in the neighborhood of SFE model solutions, suppliers can obtain their best bid offers based on market-clearing LMP and network conditions. In this case, electricity producers can derive their best offering strategy both in the power exchange and the long-term contractual markets within a profitable, yet secure, electricity market. (author)

  16. Supply curve bidding of electricity in constrained power networks

    Energy Technology Data Exchange (ETDEWEB)

    Al-Agtash, Salem Y. [Hijjawi Faculty of Engineering; Yarmouk University; Irbid 21163 (Jordan)

    2010-07-15

    This paper presents a Supply Curve Bidding (SCB) approach that complies with the notion of the Standard Market Design (SMD) in electricity markets. The approach considers the demand-side option and Locational Marginal Pricing (LMP) clearing. It iteratively alters Supply Function Equilibria (SFE) model solutions, then choosing the best bid based on market-clearing LMP and network conditions. It has been argued that SCB better benefits suppliers compared to fixed quantity-price bids. It provides more flexibility and better opportunity to achieving profitable outcomes over a range of demands. In addition, SCB fits two important criteria: simplifies evaluating electricity derivatives and captures smooth marginal cost characteristics that reflect actual production costs. The simultaneous inclusion of physical unit constraints and transmission security constraints will assure a feasible solution. An IEEE 24-bus system is used to illustrate perturbations of SCB in constrained power networks within the framework of SDM. By searching in the neighborhood of SFE model solutions, suppliers can obtain their best bid offers based on market-clearing LMP and network conditions. In this case, electricity producers can derive their best offering strategy both in the power exchange and the long-term contractual markets within a profitable, yet secure, electricity market. (author)

  17. Italian electricity supply contracts optimization: ECO computer code

    International Nuclear Information System (INIS)

    Napoli, G.; Savelli, D.

    1993-01-01

    The ECO (Electrical Contract Optimization) code written in the Microsoft WINDOWS 3.1 language can be handled with a 286 PC and a minimum of RAM. It consists of four modules, one for the calculation of ENEL (Italian National Electricity Board) tariffs, one for contractual time-of-use tariffs optimization, a table of tariff coefficients, and a module for monthly power consumption calculations based on annual load diagrams. The optimization code was developed by ENEA (Italian Agency for New Technology, Energy and the Environment) to help Italian industrial firms comply with new and complex national electricity supply contractual regulations and tariffs. In addition to helping industrial firms determine optimum contractual arrangements, the code also assists them in optimizing their choice of equipment and production cycles

  18. Aligning PEV Charging Times with Electricity Supply and Demand

    Energy Technology Data Exchange (ETDEWEB)

    Hodge, Cabell [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-06-05

    Plug-in electric vehicles (PEVs) are a growing source of electricity consumption that could either exacerbate supply shortages or smooth electricity demand curves. Extensive research has explored how vehicle-grid integration (VGI) can be optimized by controlling PEV charging timing or providing vehicle-to-grid (V2G) services, such as storing energy in vehicle batteries and returning it to the grid at peak times. While much of this research has modeled charging, implementation in the real world requires a cost-effective solution that accounts for consumer behavior. To function across different contexts, several types of charging administrators and methods of control are necessary to minimize costs in the VGI context.

  19. Lost in transition? Comparing strategies of electricity companies in Delhi

    International Nuclear Information System (INIS)

    Criqui, Laure; Zérah, Marie-Hélène

    2015-01-01

    This paper examines the notion of energy transition when implemented by private utilities. In 2000, the Delhi government privatized electricity distribution to three private distribution companies. Most research was concerned with the impact of privatization on energy reliability, tariff settings and regulation issues. This paper looks at two under-researched themes: the expansion of services to poorer neighborhoods and the rollout of clean energy policies. This focus allows to unpack the materiality of socio-technical systems, to analyze how energy infrastructures are being technically deployed on the ground and to identify which social approach is used. To detail the specific practices of each company provides a more nuanced and accurate understanding of the reform. In-depth analysis of the three private utilities show that they interpret the reform mandate differently: they use a varied range of technical tools; they respond differently to social concerns in poorer neighborhoods; and they have distinctive internal management choices and corporate cultures. All these four factors can strengthen or undermine the transition towards increased access and clean energy. - Highlights: • Energy transition in an emerging cities aims at balancing environmental and social concerns. • Utilities have distinct transition paths despite similar privatization and regulation framework. • Utilities paths depend on spatial, social, managerial and corporate considerations. • Utilities' strategies are shaped by urban challenges rather than by energy policies

  20. The evaluation of supply chain performance in the Oil Products Distribution Company, using information technology indicators and fuzzy TOPSIS technique

    Directory of Open Access Journals (Sweden)

    Daryosh Mohamadi Janaki

    2018-08-01

    Full Text Available Information Technology (IT plays an essential role on development of effective supply chain planning and it can improve the supply chain performance, either directly or indirectly. As a national industry, the National Iranian Oil Products Distribution Company involves a large number of organizations within its supply chain. Therefore, this descriptive-survey uses information sharing indicators, fuzzy TOPSIS technique based on managers and expert opinions to evaluate and to rank some oil products distribution companies. Data are analyzed and the results show that Oil Products Distribution Company of Chaharmahal and Bakhtiari received the highest rank and Farsan maintained the lowest rank compared with other regional companies.

  1. Thermionic reactor power conditioner design for nuclear electric propulsion.

    Science.gov (United States)

    Jacobsen, A. S.; Tasca, D. M.

    1971-01-01

    Consideration of the effects of various thermionic reactor parameters and requirements upon spacecraft power conditioning design. A basic spacecraft is defined using nuclear electric propulsion, requiring approximately 120 kWe. The interrelationships of reactor operating characteristics and power conditioning requirements are discussed and evaluated, and the effects on power conditioner design and performance are presented.

  2. Advanced reactor development for non-electric applications

    International Nuclear Information System (INIS)

    Chang, M.H.; Kim, S.H.

    1996-01-01

    Advance in the nuclear reactor technology achieved through nuclear power programs carried out in the world has led nuclear communities to direct its attention to a better and peaceful utilization of nuclear energy in addition to that for power generation. The efforts for non-electric application of nuclear energy has been pursued in a limited number of countries in the world for their special needs. However, those needs and the associated efforts contributed largely to the development and practical realization of advanced reactors characterized by highly improved reactor safety and reliability by deploying the most up-to-date safety technologies. Due mainly to the special purpose of utilization, economic reasons and ease in implementation of new advanced technologies, small and medium reactors have become a major stream in the reactor developments for non-electric applications. The purpose of this paper is to provide, to the interested nuclear society, the overview of the development status and design characteristics of selected advanced nuclear reactors previously developed and/or currently under development specially for non-electric applications. Major design technologies employed in those reactors to enhance the reactor safety and reliability are reviewed to present the underlying principles of the design. Along with the overview, this paper also introduces a development program and major design characteristics of an advanced integral reactor (SMART) for co-generation purpose currently under conceptual development in Korea. (author)

  3. Impact Of Secondary-Primary Pumps Operating Sequence On The Electrical Power Supply System

    International Nuclear Information System (INIS)

    Suwoto; Rusdiyanto; Kiswanto

    2001-01-01

    The operating procedure of the reactor cooling system has decided that the primary cooling pump should be operated before secondary cooling pump as known primary-secondary pumps operating sequence. This decision is based on consideration that starting current of the primary pump is higher than secondary pump. Therefore, the primary-secondary pumps operating sequence can avoid the power supply system failure. However, this operating procedure has to take a consequence that in case of primary pump failure, the shutdown time period of the reaktor to be longer caused to re operate the primary pump has required that the running secondary pump should be shutted off. To solve this problem, an impact analysis of the secondary-primary pumps operating sequence on the electric power supply system was carried out to identify the revision possibility of the cooling pump operating procedure. The analysis by discussion of the measuring results of the secondary and primary pump starting current related to another electrical loads has been measured. From discussion it can be concluded that secondary-primary pumps operating sequence has no impact to failure in electric power supply system

  4. Sustainable Federal Fleets: Deploying Electric Vehicles and Electric Vehicle Supply Equipment

    Energy Technology Data Exchange (ETDEWEB)

    2017-01-01

    The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for Sustainable Federal Fleets. To assist agencies with the transition to plug-in electric vehicles (PEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory's (NREL's) EVSE Tiger Teams.

  5. EDF: The revision of the electrical supply tariff system

    International Nuclear Information System (INIS)

    Kaczmarek, A.M.

    1982-01-01

    The article deals with proposals by EDF for restructuring their tariffs for the supply of electricity. The objective is to take account of probable developments in demand, notably the steadily increasing gap between the summer and winter rates of consumption, and in generation, notably the large increase in the fraction of the total load that is met by nuclear stations. It is estimated that by 1990 generation will be 70% nuclear, 16% hydraulic, 9% by coal and 4% by oil, nuclear generation being by far the cheapest. The general philosophy of the new tariffs is: to retain the two-part (kW and kWh) structure; to simplify tariffs for small consumers; to apply to large consumers sophisticated tariffs that accurately reflect true costs of supply; to make maximum demand rather than supply voltage the determining factor; tariffs will be geographically uniform except for a few very large consumers favourably situated with respect to key points in the network; to adopt special means to spread peak loads. The new tariffs and some additional related measures for influencing the incidence of electricity consumption are described in some detail. (C.J.O.G.)

  6. Security of electricity supply at the generation level: Problem analysis

    International Nuclear Information System (INIS)

    Rodilla, P.; Batlle, C.

    2012-01-01

    Since the very beginning of the restructuring process, back in 1982 in Chile, the ability of an electricity market to provide the system with the required level of security of supply has been put into question. The mistrust on the ability of the market, left to its own devices, to provide sufficient generation availability when needed, is more and more leading to the implementation of additional regulatory mechanisms. This matter is undoubtedly gaining importance and it has taken a key role in the energy regulators’ agendas. In this paper, we revisit this discussion under the light of thirty years of electricity market experience. We analyze the different reasons why, although ideally the market is supposed to provide itself an adequate security of supply at the generation level, this result is still far from being achieved in practice. - Highlights: ► Discussion on the need for capacity mechanisms is revisited. ► Reasons behind adequacy problem are analyzed. ► Regulator’s intervention to guarantee supply is most of the times justified.

  7. Social Corporate Responsibility regarding Household Consumer Satisfaction with the Electric Power Supply Services

    Directory of Open Access Journals (Sweden)

    Maria-Ana Georgescu

    2014-02-01

    Full Text Available The issue of the practical manifestation of corporate social responsibility towards consumers is highly important to the socio-economic reality in Romania. The present paper is the result of an investigation carried out in this field and it is distinguished by two aspects. The first aspect is its target audience used for research - household consumers of electricity, who can be called "vulnerable", captive consumers. The second aspect is the specificity of the electricity market. The aim of the research was to study the relationship between corporate social responsibility, instantiated by the quality of services provided by S.C. Electrica S.A. – Electrica Distribution and Supply South Transylvania and the consumers' loyalty towards the company, in case other electricity suppliers emerge. A subsidiary aspect was the generation of a database having an impact on customer retention. We have carried out some quantitative research, based on the survey method, having a sample of 521 household consumers from the Mures County. The study we carried out proves that consumer satisfaction, their degree of satisfaction under different aspects, is a way of gaining their trust on this particular market. Those consumers with a higher degree of trust in the company are more loyal. This will result in reducing migration to another electricity supplier, in the future, when all household consumers become eligible.

  8. Profiting from competition: Financial tools for electric generation companies

    Science.gov (United States)

    Richter, Charles William, Jr.

    Regulations governing the operation of electric power systems in North America and many other areas of the world are undergoing major changes designed to promote competition. This process of change is often referred to as deregulation. Participants in deregulated electricity systems may find that their profits will greatly benefit from the implementation of successful bidding strategies. While the goal of the regulators may be to create rules which balance reliable power system operation with maximization of the total benefit to society, the goal of generation companies is to maximize their profit, i.e., return to their shareholders. The majority of the research described here is conducted from the point of view of generation companies (GENCOs) wishing to maximize their expected utility function, which is generally comprised of expected profit and risk. Strategies that help a GENCO to maximize its objective function must consider the impact of (and aid in making) operating decisions that may occur within a few seconds to multiple years. The work described here assumes an environment in which energy service companies (ESCOs) buy and GENCOs sell power via double auctions in regional commodity exchanges. Power is transported on wires owned by transmission companies (TRANSCOs) and distribution companies (DISTCOs). The proposed market framework allows participants to trade electrical energy contracts via the spot, futures, options, planning, and swap markets. An important method of studying these proposed markets and the behavior of participating agents is the field of experimental/computational economics. For much of the research reported here, the market simulator developed by Kumar and Sheble and similar simulators has been adapted to allow computerized agents to trade energy. Creating computerized agents that can react as rationally or irrationally as a human trader is a difficult problem for which we have turned to the field of artificial intelligence. Some of our

  9. Implementation of Supply Chain Management (SCM in pharmaceutical company, general principles and case study

    Directory of Open Access Journals (Sweden)

    Zoran Nakov

    2014-12-01

    Full Text Available Supply Chain Management (SCM in pharmaceutical industry is defined as a “responsible SCM” and its implementation is according to the principles of: business ethics, rights of labor and principles of healthy and safe working environment. Pharmaceutical companies with implemented “responsible SCM” have to use management systems to facilitate continuous improvement in accordance with their working principles. The main purpose of this management system is to ensure the consistency, reliability and continuous improvement of all workflows within an organization.The analyzed case describes the project of European generic pharmaceutical company, which intends to implement best practice SCM operations for five European manufacturing sites and European logistics organizations (active ingredients supply, distribution centers, affiliate customers and third party manufacturers. The main objectives of the project were the creation of the future improved To-Be situation through implementation of new SCM models to the existing To-Day situation.

  10. Technical evaluation report on the monitoring of electric power to the reactor-protection system for the Brunswick Steam Electric Plant, Units 1 and 2

    International Nuclear Information System (INIS)

    Selan, J.C.

    1982-01-01

    This report documents the technical evaluation of the monitoring of electric power to the reactor protection system (RPS) at the Brunswick Steam Electric Plant, Units 1 and 2. The evaluation is to determine if the proposed design modification will protect the RPS from abnormal voltage and frequency conditions which could be supplied from the power supplies and will meet certain requirements set forth by the Nuclear Regulatory Commission. The proposed design modifications with time delays verified by GE, will protect the RPS from sustained abnormal voltage and frequency conditions from the supplying sources

  11. Service hall in Number 1 Fukushima Nuclear Power Station, Tokyo Electric Power Company, Inc

    International Nuclear Information System (INIS)

    Tawara, Shigesuke

    1979-01-01

    There are six BWR type nuclear power plants in the Number 1 Fukushima Nuclear Power Station, Tokyo Electric Power Company, Inc. The service hall of the station is located near the entrance of the station. In the center of this service hall, there is the model of a nuclear reactor of full scale. This mock-up shows the core region in the reactor pressure vessel for the number one plant. The diameter and the thickness of the pressure vessel are about 5 m and 16 cm, respectively. The fuel assemblies and control rods are set just like the actual reactor, and the start-up operation of the reactor is shown colorfully and dynamically by pushing a button. When the control rods are pulled out, the boiling of water is demonstrated. The 1/50 scale model of the sixth plant with the power generating capacity of 1100 MWe is set, and this model is linked to the mock-up of reactor written above. The operations of a recirculating loop, a turbine and a condenser are shown by switching on and off lamps. The other exhibitions are shielding concrete wall, ECCS model, and many kinds of panels and models. This service hall is incorporated in the course of study and observation of civics. The good environmental effects to fishes and shells are explained in this service hall. Official buildings and schools are built near the service hall utilizing the tax and grant concerning power generation. This service hall contributes to give much freedom from anxiety to the public by the tour. (Nakai, Y.)

  12. Environmental assessment of current and future Swiss electricity supply options

    International Nuclear Information System (INIS)

    Bauer, Christian; Heck, Thomas; Hirschberg, Stefan; Dones, Roberto

    2008-01-01

    Options for near future electricity supply are currently one of the main topics in the Swiss energy policy debate. Contrary to the total energy demand per capita the trend of rising electricity demand per capita is still visible. This paper presents a comparative environmental assessment of a broad portfolio of current and future electricity generation technologies including nuclear, fossil, and renewable power plants with their associated energy chains. The evaluation, based on Life Cycle Assessment (LCA), is carried out quantifying ten different environmental indicators, grouped in the categories greenhouse gas emissions, consumption of resources, waste, and impact on ecosystems. Hydropower shows minimal environmental impacts for all indicators; for other systems, the picture is diverse. The comparison of non-aggregated indicators allows preliminary conclusions about the environmental performance of the assessed systems. Establishing ranking of technologies calls for aggregating the indicators, which can be done by weighting of the indicators based on individual or stakeholder group preferences, either within a Multi-Criteria Decision Analysis (MCDA) framework or with Life Cycle Impact Assessment (LCIA) methods. Calculating total costs of electricity by adding external costs due to impacts on human health and ecosystems to the electricity production costs poses another option for ranking of technologies. (authors)

  13. Electricity supply, district heating and supply of natural- and gas-works gas 1998

    International Nuclear Information System (INIS)

    2000-01-01

    and personal services +1.5 %; and in the household sector (excluding agricultural households) +0.5 %. Imports of electrical energy from neighbouring countries amounted to 10 252 GWh, a decrease of 35.5 % compared to 1997, and exports increased by 33 % to 12 960 GWh. The share of imports in the total supply was 6.6 % in 1998, while the share of exports was 8.3 %

  14. Water Loss Reduction as the Basis of Good Water Supply Companies' Management

    Science.gov (United States)

    Ociepa-Kubicka, Agnieszka; Wilczak, Krzysztof

    2017-10-01

    Companies using water distribution systems to reduce the operating costs and increase the reliability of water supply systems, as well as to protect disposable water resources, must search for ways to reduce water losses. The article points out the economic and environmental aspects of water losses. The possibilities of using international water loss assessment standards have been analysed. The reflections presented in the paper refer to the current trends and world standards in the field of water distribution systems management. The article presents the results and analysis of water losses for the water supply network operated by the Water Supply and Sewerage Company in Gliwice (Przedsiębiorstwo Wodociągów i Kanalizacji w Gliwicach, PWiK). The losses were determined on the basis of numerous indicators and compared with other distribution systems. At present, most indicators of water loss are at a very good or good level. The Infrastructure Leakage Index (ILI), as one of the most reliable loss indicators for the surveyed distribution system, assumed values from 3.33 in 2012 to 2.06 in 2015. The recent drop in ILI values indicates the effectiveness of the Company's strategy for water leakage reduction. The success comprises a number of undertakings, such as ongoing monitoring, pressure reduction and stabilisation, repairs and replacement of the most emergency wires.

  15. Supply management and promotion of passion fruit production: the case of Alpha company

    Directory of Open Access Journals (Sweden)

    Sara Fátima Pereira Morais

    2017-09-01

    Full Text Available The search for improvement in the supply management has grown significantly due to the goal of strengthening ties with suppliers to generate mutual benefits. In this context and based on a program of development by Alpha Company, the aim of this study was to identify and analyze the main factors that led the company to design the promotional program, the results of which were obtained from the perception of employees and producers involved in the program as well as their perspectives for the future. Using a qualitative approach, a case study was performed with data collected through semi-structured interviews, in addition to documentary data provided by the company. It was observed that the agricultural development program was created to ensure the supply flow of passion fruit for the company studied, with the provision of technical assistance and minimum price to producers being examples of some of the strings attached. The results obtained so far have been positive both in the perception of the producers and employees, but some aspects can be improved. The program has been shown as an instrument of formalization of a partnership between producer and industry, but there is no expectation, at least for now, of this program expanding into other products.

  16. Electrical system regulations of the IEA-R1 reactor

    International Nuclear Information System (INIS)

    Mello, Jose Roberto de; Madi Filho, Tufic

    2013-01-01

    The IEA-R1 reactor of the Nuclear and Energy Research Institute (IPEN-CNEN/SP), is a research reactor open pool type, designed and built by the U.S. firm Babcock and Wilcox, having, as coolant and moderator, deionized light water and beryllium and graphite, as reflectors. Until about 1988, the reactor safety systems received power from only one source of energy. As an example, it may be cited the control desk that was powered only by the vital electrical system 220V, which, in case the electricity fails, is powered by the generator group: no-break 220V. In the years 1989 and 1990, a reform of the electrical system upgrading to increase the reactor power and, also, to meet the technical standards of the ABNT (Associacao Brasileira de Normas Tecnicas) was carried out. This work has the objective of showing the relationship between the electric power system and the IEA-R1 reactor security. Also, it demonstrates that, should some electrical power interruption occur, during the reactor operation, this occurrence would not start an accident event. (author)

  17. Integrated energy systems for hydrogen and electricity supply

    Energy Technology Data Exchange (ETDEWEB)

    Muradov, N. [Univ. of Central Florida, Cocoa, FL (United States). Florida Solar Energy Center; Manikowski, A.; Noland, G. [Procyon Power Systems Inc., Alameda, CA (United States)

    2002-07-01

    The United States will soon need an increase in electric generating capacity along with an increase in the distribution capacity of the electricity grid. The cost and time required to build additional electrical distribution and transmission systems can be avoided by using distributed power generation. This paper examines the development of an integrated stand-alone energy system that can produce hydrogen, electricity and heat. The concept is based on integrated operation of a thermocatalytic pyrolysis (TCP) reactor and a solid oxide fuel cell (SOFC). The benefits include high overall energy efficiency, the production of high quality hydrogen (90 to 95 per cent free of carbon oxides), low emissions, and fuel flexibility. Experimental data is presented regarding the thermocatalytic pyrolysis of methane compared with an iron-based catalyst (which is sulfur resistant) and gasification of the resulting carbon with steam and carbon dioxide. With distributed generation, additional electrical generating capacity can be added in small increments distributed over the grid. An integrated energy system will be applicable to any type of hydrocarbon fuel, such as natural gas, liquid propane gas, gasoline, kerosene, jet fuel, diesel fuel and sulfurous residual oils. The suitable range of operating parameters needed to decoke a catalyst bed using steam and carbon dioxide as a degasifying agent was also determined. The Fe-catalyst was efficient in both methane pyrolysis and steam/CO{sub 2} gasification of carbon. It was shown that the TCP and SOFC complement each other in may ways. With the IES, high quality hydrogen is delivered to the end user. IES can also operate as either a hydrogen production unit or as an electrical power generator. The energy efficiency of the IES is estimated at 45-55 per cent. 6 refs., 8 figs.

  18. Wind energy in a competitive electricity supply environment

    Energy Technology Data Exchange (ETDEWEB)

    Strbac, G; Jenkins, N [Manchester Centre for Electrical Energy, Manchester (United Kingdom)

    1996-12-31

    In the UK, there has been an increasing interest in the commercial aspects of the impact of wind energy on transmission and distribution networks. In a competitive electricity supply environment, mechanisms for pricing network services are considered to be the main vehicle for evaluating that impact. This article reviews the major pricing strategies based on embedded costs, short and long run marginal costing theory as well as time-of-use pricing, and comments on the influence of each particular strategy on the calculated value of wind energy. Also, prospective tools for evaluating savings in capital and operating network costs due to wind generation, are identified. (author)

  19. Wind energy in a competitive electricity supply environment

    Energy Technology Data Exchange (ETDEWEB)

    Strbac, G.; Jenkins, N. [Manchester Centre for Electrical Energy, Manchester (United Kingdom)

    1995-12-31

    In the UK, there has been an increasing interest in the commercial aspects of the impact of wind energy on transmission and distribution networks. In a competitive electricity supply environment, mechanisms for pricing network services are considered to be the main vehicle for evaluating that impact. This article reviews the major pricing strategies based on embedded costs, short and long run marginal costing theory as well as time-of-use pricing, and comments on the influence of each particular strategy on the calculated value of wind energy. Also, prospective tools for evaluating savings in capital and operating network costs due to wind generation, are identified. (author)

  20. Questions of the day in the electricity supply industry

    International Nuclear Information System (INIS)

    Schenk, P.

    1977-01-01

    In his exposition the author deals with the especially important points which have given rise to the situation in the German electricity supply industry since the oil-price crisis, and in particular in the year 1976. He then turns to the present urgent problems facing this branch of industry. As key-words we would mention: the energy programme; meeting the power demand; and nuclear energy from licensing up to the disposal of the waste material; the use of conventional power stations; actions by associations/initiatives; saving of energy; promotion of energy consumption by advertising and power/heat coupling. (orig.) [de

  1. Development of Solar Electricity Supply System in India: An Overview

    Directory of Open Access Journals (Sweden)

    Sandeep Kumar Gupta

    2013-01-01

    Full Text Available Solar electricity supply system has grown at very rapid pace in India during the last few years. A total of 1047.84 MW of grid connected photovoltaic projects and 160.8 MW of off-grid systems have been commissioned under different policy mechanisms between January 2010 and November 2012. It is observed that solar capacity development has achieved a greater height under state policies (689.81 MW than others. A study is made in this paper of various national and state level schemes, incentives, packages, instruments, and different mechanisms to promote solar photovoltaics and its effectiveness.

  2. Control of PWR reactor energy supplied to a stream turbine

    International Nuclear Information System (INIS)

    Petetrot, J.F.; Parent, Pierre.

    1981-01-01

    This patent presents a process for regulating the power provided by a pressurized water nuclear reactor to a steam turbine, by moving the control rods absorbing the neutrons in the reactor core and by diverting a fraction of the steam produced by the reactor, outside the turbine circuit, by opening by-pass valves [fr

  3. Developing strategic planning of green supply chain in refinery CPO company

    Science.gov (United States)

    Hidayati, J.; Mumtaz, G.; Hasibuan, S.

    2018-02-01

    We are conducted a research at the company of the manufacturing CPO into cooking oil, margarine and materials of oleochemical industries. Today palm oil based industries are facing global challenges related to environmental issues. To against these challenges, it is necessary to have an environmentally friendly supply chain. However, the limited resource owned by the company requires the integrated environmental strategy with the company’s business strategy. The model is developed based on management orientation towards external pressure, internal key resources and competitive advantage that can be obtained as the decision factor. The decision-making method used is Analytical Network Process (ANP). The results obtained institutional pressure becomes the criterion with the greatest influence on green supply chain initiatives and sub criteria of customer desires and stakeholder integration having the most significant influence on green supply chain initiatives. There are five green alternative initiatives that can be done: green product design, greening upstream, greening production, greening downstream and greening post use. For green supply chain initiative, greening upstream is the best priority.

  4. Development on power distribution technologies of four electric power companies in Japan. The Tokyo Electric Power Co. , Inc

    Energy Technology Data Exchange (ETDEWEB)

    1989-07-01

    Electric power companies have been needed to cope with various needs in accordance with the progress of highly information-oriented society, the improvement of industrial technology, and the advancement and diversification of the living environment. In such situation, the power distribution section of Tokyo Electric Power has promoted technical development, setting up following priority items to put into operation: to reduce power failure caused by works and accidents, to improve reliability in supply, to reduce costs of construction and all over business management, to serve customers to answer various needs, to develop new technology and new methods based on the medium- and long-term prospect, and so forth. Several examples of recent technical development are introduced here. They are as follows; compact equipment and materials for electric poles to match the circumstances of cities and to simplify the construction method for power distribution, a 750kVA large high-voltage power-generation truck to make provision against an emergency such as a disaster by a typhoon, a compact transformer used on the ground, a high-voltage automatic cabinet, and a detector to find the failure of indoor power distribution works in resistances in a short time. 8 figs.

  5. Sustainable electric energy supply by decentralized alternative energy technologies

    Energy Technology Data Exchange (ETDEWEB)

    Zahedi, A., E-mail: Ahmad.Zahedi@jcu.edu.au [James Cook University, Queensland (Australia). School of Engineering and Physical Sciences

    2010-07-01

    The most available and affordable sources of energy in today's economic structure are fossil fuels, namely, oil, gas, and coal. Fossil fuels are non-renewable, have limited reserves, and have serious environmental problems associated with their use. Coal and nuclear energy are used in central and bulky power stations to produce electricity, and then this electricity is delivered to customers via expensive transmission lines and distribution systems. Delivering electric power via transmission and distribution lines to the electricity users is associated with high electric power losses. These power losses are costly burdens on power suppliers and users. One of the advantages of decentralized generation (DG) is that DG is capable of minimizing power losses because electric power is generated at the demand site. The world is facing two major energy-related issues, short term and long term. These issues are (i) not having enough and secure supplies of energy at affordable prices and (ii) environmental damages caused by consuming too much energy in an unsustainable way. A significant amount of the current world energy comes from limited resources, which when used, cannot be replaced. Hence the energy production and consumption do not seem to be sustainable, and also carries the threat of severe and irreversible damages to the environment including climate change.The price of energy is increasing and there are no evidences suggesting that this trend will reverse. To compensate for this price increase we need to develop and use high energy efficient technologies and focusing on energy technologies using renewable sources with less energy conversion chains, such as solar and wind. The world has the potential to expand its capacity of clean, renewable, and sustainable energy to offset a significant amount of greenhouse gas emissions from conventional power use. The increasing utilization of alternative sources such as hydro, biomass, geothermal, ocean energy, solar and

  6. ROLE OF SUPPLY CHAIN MANAGEMENT IN INCREASING THE COMPETITIVENESS OF COMPANIES IN A GLOBAL CONTEXT

    Directory of Open Access Journals (Sweden)

    Liviu MĂRCUTĂ

    2013-01-01

    Full Text Available The supply chain management is an important source of improving the company’s efficacy and effectiveness because it facilitates the logistic integration between companies, the integrated management of the supply chains of the partners, respectively, in view of creating added value for the final client, which allows the creation of long term relationships or partnerships, which involves the cooperation in order to improve the design, diminish the costs, improve the quality and develop products to be launched as quickly as possible on the market. In the broadest sense, the supply chain management includes the entire network and develops strategies and influences to invest in and relate upstream with suppliers, supplier’ suppliers etc., and also to invest in and relate downstream with clients, client’ clients etc. up to the end user.

  7. A review of learning rates for electricity supply technologies

    International Nuclear Information System (INIS)

    Rubin, Edward S.; Azevedo, Inês M.L.; Jaramillo, Paulina; Yeh, Sonia

    2015-01-01

    A variety of mathematical models have been proposed to characterize and quantify the dependency of electricity supply technology costs on various drivers of technological change. The most prevalent model form, called a learning curve, or experience curve, is a log-linear equation relating the unit cost of a technology to its cumulative installed capacity or electricity generated. This one-factor model is also the most common method used to represent endogenous technical change in large-scale energy-economic models that inform energy planning and policy analysis. A characteristic parameter is the “learning rate,” defined as the fractional reduction in cost for each doubling of cumulative production or capacity. In this paper, a literature review of the learning rates reported for 11 power generation technologies employing an array of fossil fuels, nuclear, and renewable energy sources is presented. The review also includes multi-factor models proposed for some energy technologies, especially two-factor models relating cost to cumulative expenditures for research and development (R&D) as well as the cumulative installed capacity or electricity production of a technology. For all technologies studied, we found substantial variability (as much as an order of magnitude) in reported learning rates across different studies. Such variability is not readily explained by systematic differences in the time intervals, geographic regions, choice of independent variable, or other parameters of each study. This uncertainty in learning rates, together with other limitations of current learning curve formulations, suggests the need for much more careful and systematic examination of the influence of how different factors and assumptions affect policy-relevant outcomes related to the future choice and cost of electricity supply and other energy technologies. - Highlights: • We review models explaining the cost of 11 electricity supply technologies. • The most prevalent model

  8. Security of supply in electricity markets: Improving cost efficiency of supplying security and possible welfare gains

    DEFF Research Database (Denmark)

    Klinge Jacobsen, Henrik; Grenaa Jensen, Stine

    2012-01-01

    In liberalised markets the ability to maintain security of electricity supply is questioned because security is characterised as a public good. We discuss if this property can be modified with changing technology. Furthermore, we examine if construction of markets for security can be justified...... by possible welfare gains. From a welfare perspective it is possible that security levels are too high and obtained with too high costs. Adjusting the effort so that marginal cost for securing supply is at similar levels in generation capacity and in network maintenance could increase welfare even without...... the need to construct markets. Secondarily, a consumer defined average level of security might improve welfare. Finally, different willingness to pay among customers and construction of advanced markets might increase welfare further. We argue that several cost and welfare improvements can be achieved...

  9. Reactor power control method upon accidents of electrical power system

    International Nuclear Information System (INIS)

    Hirose, Masao.

    1983-01-01

    Purpose: To enable to continue the operation of a BWR type reactor by avoiding the scram while suppressing the reactor power, just after the external disturbance such as earth-trouble in power-transmission network. Method: Steep power drop of an electrical generator is to be detected not only by a current-type power-load-unbalance relay but also with a power-type power-load-unbalance-relay. If steep power-drop was detected by the latter relay, a previously selected control rod is rapidly inserted into the reactor. In this way, in the case where there is a possibility of the reactor scram, the scram can be avoided by suppressing the reactor power, thus the reactor operation can be continued. (Kamimura, M.)

  10. Assessment of Smart Reactor Utilization for Barelang

    International Nuclear Information System (INIS)

    Sahala-M-Lumbanraja; Yuliastuti

    2007-01-01

    This paper assesses the feasibility of SMART reactor utilization in BARELANG region. BARELANG region is an industrial area located in Riau Islands Province. The need of electricity and fresh water, whether for industry growth or people, are the main problem of this region. Until now, the National Electricity Company (PLN) has not able to supply the electricity needed by industrial sector. The use of oil as a main electricity generation resource of the entire power plant has caused a tremendous generation cost. On dry seasons, the fresh water supplied by PDAM is reducing drastically. This situation occurs because water source of PDAM extremely depends on the water storage during rainy seasons. SMART reactor is a modular light reactor developed by KAERI for dual purposes, producing electricity and fresh water at the same time. The total thermal power generated by this type of reactor is about 330 M Wth with 33 % efficiency, as 90 M We connected to the electricity grid and rest is used in producing potable water with capacity 40,000 m 3 /day. Compare to the conventional reactor, SMART reactor is based on simple operation and maintenance principles, enhanced safety, easy to inspect, a relatively short construction time, small investment cost, competitive generation cost, and a flexible design to fit with the existing infrastructure. The main characteristic of SMART reactor is an integral design concept where the entire main cooling system components are located in the pressurize vessel. (author)

  11. Solar and the future of Ontario's electricity supply

    International Nuclear Information System (INIS)

    McMonagle, R.

    2005-01-01

    The potential contribution of solar energy to Ontario's electricity supply was evaluated in this PowerPoint presentation. Only 3.5 per cent of Canada's photovoltaic (PV) systems are connected to the electricity grid. However, 47 per cent of all homes in Ontario have the potential to install 3 kW PV arrays, and the solar industry has the potential to achieve growth rates of between 50 to 75 per cent, with medium term sustainable growth estimated at 30 to 40 per cent annually. The benefits of grid-connected solar energy include employment and wealth creation in Ontario; reductions in peak demand; and improved grid efficiency. It was noted that the price of solar PV is declining. Various market niches for solar energy technologies were outlined, and the targeting of early adopters was recommended as a first market for PV growth. An overview of the value of PV build-ups in California was presented, as well details of international tariffs and rates. A 10 year program leading to the installation of 15,000 PV systems or 40 MWp of installed capacity in Ontario by 2015 was outlined, as well as a plan for solar financing. It was concluded that priming the market now will mean that solar will be prepared to contribute to Ontario's supply during the 2015-2025 period, when its price will be competitive. refs., tabs., figs

  12. An analysis of electric utility embedded power supply costs

    International Nuclear Information System (INIS)

    Kahal, M.; Brown, D.

    1998-01-01

    There is little doubt that for the vast majority of electric utilities the embedded costs of power supply exceed market prices, giving rise to the stranded cost problem. Beyond that simple generalization, there are a number of crucial questions, which this study attempts to answer. What are the regional patterns of embedded cost differences? To what extent is the cost problem attributable to nuclear power? How does the cost of purchased power compare to the cost of utility self-generation? What is the breakdown of utility embedded generation costs between operating costs - which are potentially avoidable--and ownership costs, which by definition are ''sunk'' and therefore not avoidable? How will embedded generation costs and market prices compare over time? These are the crucial questions for states as they address retail-restructuring proposal. This study presents an analysis of generation costs, which addresses these key questions. A computerized costing model was developed and applied using FERC Form 1 data for 1995. The model analyzed embedded power supply costs (i.e.; self-generation plus purchased power) for two groups of investor-owned utilities, 49 non-nuclear vs. 63 nuclear. These two subsamples represent substantially the entire US investor-owned electric utility industry. For each utility, embedded cost is estimated both at busbar and at meter

  13. Saving electricity in a hurry. Dealing with temporary shortfalls in electricity supplies

    Energy Technology Data Exchange (ETDEWEB)

    none

    2005-07-01

    Blackouts are normally the result of imbalances in electricity supply and demand. A brief blackout is mostly an inconvenience. But persistent shortfalls ? those lasting days, weeks, or months ? can cause economic disruption and danger to human life in our technology-rich societies. Saving Electricity in a Hurry describes some of the recent power shortfalls, from Norway to New Zealand, from Tokyo to Arizona and the policies these regions used to quickly reduce their power consumption. How did the whole country of Sweden cut its power consumption by 4% in only three days? How did California save 14% in only a few months? While the temporary shortfalls in electricity supplies described in this book are relatively rare events, they disproportionately shape future energy policies. Saving Electricity in a Hurry shows that countries can quickly reduce electricity consumption without harming the economy as much as blackouts or unplanned curtailments. The strategies are diverse, unique and often surprisingly cheap. They include mass media campaigns ? where a good joke can save a Megawatt ? improvements in equipment efficiency and quickly adjusting electricity prices. This book explains how California replaced a million traffic signals with energy-saving models, how millions of Tokyo residents raised their thermostat settings, and how New Zealanders took shorter showers, all quickly enough to help avoid imminent blackouts. Finally, it connects these policies to the traditional goal of ?saving electricity slowly?.

  14. Annual report 2000 of COPEL - Electrical Company of Parana State, Brazil

    International Nuclear Information System (INIS)

    2000-01-01

    The annual report of COPEL - Electrical Company of Parana State, Brazil, during the calendar year of 2003 is presented, comprising: a management report, portraying the Company's accomplishments during the year in connection with its core businesses and a social balance sheet, addressing the Company's efforts to contribute to the development and well-being of the community by means of socially oriented projects

  15. Evaluation of Public Service Electric & Gas Company`s standard offer program, Volume I

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, C.A.; Kito, M.S.; Moezzi, M.M.

    1995-07-01

    In May 1993, Public Service Electric and Gas (PSE&G), the largest investor-owned utility in New Jersey, initiated the Standard Offer program, an innovative approach to acquiring demand-side management (DSM) resources. In this program, PSE&G offers longterm contracts with standard terms and conditions to project sponsors, either customers or third-party energy service companies (ESCOs), on a first-come, first-serve basis to fill a resource block. The design includes posted, time-differentiated prices which are paid for energy savings that will be verified over the contract term (5, 10, or 15 years) based on a statewide measurement and verification (M&V) protocol. The design of the Standard Offer differs significantly from DSM bidding programs in several respects. The eligibility requirements and posted prices allow ESCOs and other energy service providers to market and develop projects among customers with few constraints on acceptable end use efficiency technologies. In contrast, in DSM bidding, ESCOs typically submit bids without final commitments from customers and the utility selects a limited number of winning bidders who often agree to deliver a pre-specified mix of savings from various end uses in targeted markets. The major objectives of the LBNL evaluation were to assess market response and customer satisfaction; analyze program costs and cost-effectiveness; review and evaluate the utility`s administration and delivery of the program; examine the role of PSE&G`s energy services subsidiary (PSCRC) in the program and the effect of its involvement on the development of the energy services industry in New Jersey; and discuss the potential applicability of the Standard Offer concept given current trends in the electricity industry (i.e., increasing competition and the prospect of industry restructuring).

  16. Sustainable electricity options for Malaysia: the emerging importance of renewable electricity supply options

    International Nuclear Information System (INIS)

    Rosli, M.M.; Yusop, Y.M.

    2006-01-01

    Rapid economic expansion in Malaysia over recent decades has led to a large growth in demand for electricity. Demand growth has put a strain on the ability of the economy to expand its electricity infrastructure capacity rapidly to meet the surge in demand. Over the next decade or two, assuming Malaysia will continue to grow at current growth rates of 4.0%, Malaysia will require enormous supply of electricity to meet demand growth. To congregate this challenge, Malaysia needs to consider the energy supply systems that can contribute to the long-term sustainability of economy in the future. Energy supply is critical to social and economic development, and they both have direct and indirect impacts on the environment. The idea of sustainable energy frequently focuses on renewable energy (RE) resources and consideration of these resources in meeting the energy requirements of Malaysia is given high priority in this paper. This paper will embrace the issue of electricity supply resources, technologies and energy policies in accommodating the economy towards energy sustainability over the long term, thus meeting immediate energy needs. It is also the intention of this paper to highlight new and existing RE technologies and their important roles in encouraging a sustainable electricity supply growth pattern in Malaysia. RE generation systems will begin to make significant contributions to new generation capacity installations. However, political and policy reform will have to occur at an unprecedented rate for this to materialise. Malaysia Vision 2020 envisions for a caring society to evolve as part of the country ambition of achieving developed nation status. A balanced growth using sustainable development principles is advocated in which today's needs are met without compromising the needs of future generation

  17. 76 FR 35208 - Pacific Gas and Electric Company; Nevada Irrigation District; Notice of Environmental Site Review

    Science.gov (United States)

    2011-06-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 2310-193--California; Project No. 2266-102--California] Pacific Gas and Electric Company; Nevada Irrigation District; Notice of Environmental Site Review On July 6-8, 2011, the Federal Energy Regulatory Commission (Commission) staff and the Pacific Gas and Electric Company ...

  18. 77 FR 7211 - Pacific Gas and Electric Company, Diablo Canyon Independent Spent Fuel Storage Installation...

    Science.gov (United States)

    2012-02-10

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 72-26; NRC-2011-0110] Pacific Gas and Electric Company...) issued NRC Materials License No. SNM-2511 to the Pacific Gas and Electric Company (PG&E) for the Diablo.... 5. TS 3.1.2, ``Spent Fuel Storage Cask (SFSC) Heat Removal System,''--revise to allow the HI-STORM...

  19. 76 FR 44323 - National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of...

    Science.gov (United States)

    2011-07-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-49-000] National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of Petition for Declaratory Order Take..., 18 CFR 385.207, National Grid Transmission Services Corporation and Bangor Hydro Electric Company...

  20. 76 FR 36533 - Bangor Hydro Electric Company; Notice of Request for Waiver

    Science.gov (United States)

    2011-06-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11-5-000] Bangor Hydro Electric Company; Notice of Request for Waiver Take notice that on June 13, 2011, pursuant to section 358.1(d) of the Commission's regulations, 18 CFR 358.1(d) (2011), Bangor Hydro Electric Company (Bangor...

  1. 75 FR 30021 - South Carolina Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference...

    Science.gov (United States)

    2010-05-28

    ... Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference With the National Marine... from Federal Energy Regulatory Commission (FERC) Headquarters, commencing at 2 p.m. (Eastern Standard... Project. The South Carolina Electric and Gas Company will also participate in the teleconference. All...

  2. Forecast Development of Electricity Supply in the Indonesian Archipelago

    International Nuclear Information System (INIS)

    Soedyartomo, T. M.; Widayanti, E.; Hartati, R. S.; Giriantari, I. A.

    2015-01-01

    Indonesia is an archipelago consisting of 17 000 islands, of which some are heavily populated and others have no inhabitants or even a name. The country’s population is growing by 1.1% per year, so the demand for electricity has been increasing as well. The Indonesian archipelago — as a location for renewable energy sources such as micro-hydro, wind, solar, geothermal and biomass—presents unique opportunities to invest in expanding power production. In the industrialised regions and on large islands, such as Kalimantan, the electricity demand is highest. Most of the electricity is supplied by large power plants using fossil fuel — coal, oil and gas — which causes an increase in the volume and concentration of greenhouse gases. Moreover, the currently installed power plants do not meet the energy needs of Indonesia’s population of two hundred million. As a solution, within the next five years, the Indonesian Government plans to build power plants adding 35 000 MWe. The electricity demand forecast for 2050 will be around 200 GWe, with 160 GWe coming from renewable and conventional energy sources and 40 GWe from alternative sources such as nuclear power. To meet the demand for electricity in Indonesia, an expansion strategy is needed for alternative sources of energy on the islands around the Java Sea and on the island of Kalimantan at locations safe from earthquakes. The Indonesian Government has provided some guidelines for commercial nuclear power plants, such as those contained in Government regulations No. 5 and No. 43 of 2006. (author)

  3. An FAHP-TOPSIS framework for analysis of the employee productivity in the Serbian electrical power companies

    Directory of Open Access Journals (Sweden)

    Snezana Pavle Knezevic

    2017-09-01

    Full Text Available The aim of this paper is to apply an integrated model, which combines methods of classical and fuzzy Multi-criteria decision making (MCDM in selected six large equity companies from the Serbian energy sector. The data considered are retrieved from the official financial statements. Four main criteria were analyzed, identified by the previous researchers and pointing to the employees productivity: Operating income/Number of employees, Equity/Number of employees, Net income/Number of employees and Total assets/Number of employees. The contribution of this paper lies in the application of a hybrid model that integrates two MCDM methods: Fuzzy Analytic Hierarchy Process (FAHP and Technique for Order Performance by Similarity to Ideal Solution (TOPSIS to analyse the employee productivity in selected D-Electrical power supply companies operating in Serbia. The FAHP is an effective method for mathematical representation of uncertain and imprecise evaluations made by humans, while the TOPSIS method is an efficient way to rank the alternatives. Results show that operating income is of highest importance for estimating employee productivity and decision making, while equity is of the weakest. Furthermore, the most productive operations in large enterprises from selected companies of the sector D-Electrical power supply are found in the company PC EPS Beograd, and the lowest are in the ED Center llc Kragujevac.

  4. Determinants of RFID Adoption in Supply Chain among Manufacturing Companies in China: A Discriminant Analysis

    Directory of Open Access Journals (Sweden)

    Suhaiza Zailani

    2009-05-01

    Full Text Available The growth of China’s economy hinges to a large extent on the ability of the industry to operate more efficiently and effectively in the global supply chain system. China’s manufacturing companies should pay attention to adopt more efficient supply chain technologies to provide better services for their customers. China has initially carried out research and development and industrialization of technology related to RFID and begun to apply in some areas in recent years. This article studies the determinant factors of the RFID adoption by manufacturing companies in China. The population of this study is manufacturing companies in China that are registered under Federation of China Manufacturers. A questionnaire survey is conducted to study the adoption of RFID by China’s manufacturing industry. This study reveals that the environment, organization, technology and product have the impact on the adoption of RFID in China. Organization should be given strategic attention to improve employee participation in adopting RFID as a strategic tool.

  5. A Bayesian stochastic frontier analysis of Chinese fossil-fuel electricity generation companies

    International Nuclear Information System (INIS)

    Chen, Zhongfei; Barros, Carlos Pestana; Borges, Maria Rosa

    2015-01-01

    This paper analyses the technical efficiency of Chinese fossil-fuel electricity generation companies from 1999 to 2011, using a Bayesian stochastic frontier model. The results reveal that efficiency varies among the fossil-fuel electricity generation companies that were analysed. We also focus on the factors of size, location, government ownership and mixed sources of electricity generation for the fossil-fuel electricity generation companies, and also examine their effects on the efficiency of these companies. Policy implications are derived. - Highlights: • We analyze the efficiency of 27 quoted Chinese fossil-fuel electricity generation companies during 1999–2011. • We adopt a Bayesian stochastic frontier model taking into consideration the identified heterogeneity. • With reform background in Chinese energy industry, we propose four hypotheses and check their influence on efficiency. • Big size, coastal location, government control and hydro energy sources all have increased costs

  6. Ten-year statistics of the electric power supply. Status and tendencies

    International Nuclear Information System (INIS)

    2001-12-01

    The ten-year statistics of the electric power supply in Denmark for 1991-2000 presents in tables and figures the trend of the electric power supply sector during the last ten years. The tables and figures present information on total energy consumption, combined heat and power generation, fuel consumption and the environment, the technical systems, economy and pricing, organization of the electricity supply, and information on electricity prices and taxes for households and industry in various countries. (LN)

  7. Past and present supply of enriched uranium for research reactors in the European Union

    International Nuclear Information System (INIS)

    Mueller, H.

    2002-01-01

    In the last decade research reactor operators have focused mainly on the issues of disposal of spent research reactor fuel and the development of high density fuels. The safe supply of fresh uranium did not receive as much attention. This is surprising since the United States - who was the main supplier for LEU and HEU since the late 1950's - stopped supplying non-US research reactors with enriched uranium a decade ago. The reason for this stop of supply is described in this paper. This paper explains how research reactors in the E U continued to operate during the last decade, in spite of the fact that their primary supply source had not provided LEU and HEU over the same period. (author)

  8. CNE (Embalse nuclear power plant): probabilistic safety study. Electric power supply. Events sequence

    International Nuclear Information System (INIS)

    Figueroa, N.

    1987-01-01

    The plant response to the occurrence of the starting event 'total loss of electric power supply to class IV and class III' is analyzed. This involves the study of automatical actions of safety and process systems as well as the operator actions. The probabilistic evaluation of starting event frequency is performed through fault-tree techniques. The frequency of occurrence 'loss of electric power supply to class IV (λIV = 0.56/year) and the probability of failure to demand of 'reserve' generating groups (Pd III 6.79 x 10 -3 ) contribute to the mentioned frequency. As soon as the starting event occurs, the reactor power must be reduced to 0%, the fuel must be cooled through the thermo siphon and decay heat has to be removed. The events sequence analysis leads to the conclusion that the non shutting down of the reactor with any of the shutdown systems is 'incredible' (10 -6 /year). In all cases the fuel is cooled by building the thermo siphon except when a substantial inventory loss exist due to a closure failure of some valve of pressure and inventory control system. The order of magnitude of the failure of decay heat removal through the steam generators is 4 x 10 -4 . This removal would be assured by the emergency water system. Therefore, the frequency of the sequence of possible core meltdown, when the reactor does not shut down is: λ = 5 x 10 -9 /year and for the failure of heat removal: λ = 2 x 10 -6 /year. (Author)

  9. Potential for deserts to supply reliable renewable electric power

    Science.gov (United States)

    Labordena, Mercè; Lilliestam, Johan

    2015-04-01

    To avoid dangerous climate change, the electricity systems must be decarbonized by mid-century. The world has sufficient renewable electricity resources for complete power sector decarbonization, but an expansion of renewables poses several challenges for the electricity systems. First, wind and solar PV power are intermittent and supply-controlled, making it difficult to securely integrate this fluctuating generation into the power systems. Consequently, power sources that are both renewable and dispatchable, such as biomass, hydro and concentrating solar power (CSP), are particularly important. Second, renewable power has a low power density and needs vast areas of land, which is problematic both due to cost reasons and due to land-use conflicts, in particular with agriculture. Renewable and dispatchable technologies that can be built in sparsely inhabited regions or on land with low competition with agriculture would therefore be especially valuable; this land-use competition greatly limits the potential for hydro and biomass electricity. Deserts, however, are precisely such low-competition land, and are at the same time the most suited places for CSP generation, but this option would necessitate long transmission lines from remote places in the deserts to the demand centers such as big cities. We therefore study the potential for fleets of CSP plants in the large deserts of the world to produce reliable and reasonable-cost renewable electricity for regions with high and/or rapidly increasing electricity demand and with a desert within or close to its borders. The regions in focus here are the European Union, North Africa and the Middle East, China and Australia. We conduct the analysis in three steps. First, we identify the best solar generation areas in the selected deserts using geographic information systems (GIS), and applying restrictions to minimize impact on biodiversity, soils, human heath, and land-use and land-cover change. Second, we identify

  10. Security of supply and investments in the electricity sector

    International Nuclear Information System (INIS)

    Bouttes, J.P.

    2005-01-01

    Today, security of supply in electricity can be expressed in new terms, given the development of competition beyond national borders, particularly after the blackouts that occurred in Italy and New-York in 2003. Three causes are put forward to explain the difficulties encountered: the excessive market power of generators; market design that failed to acknowledge the electricity's specific attributes and incoherent government policy at national levels or between neighboring countries. Revisiting these debates, we try to develop the following conjectures: - If there are no regulatory or political barriers to siting, and if the market includes industrial players integrated from generation to marketing, market power is limited and controllable; - It is crucial to take into account the specific attributes of electricity in the design of power markets; - analysis of recent crises reveals them to be related to incoherent, unstable government policy and market design. Herein lies what are no doubt the most important and difficult questions to which economists and experts should devote further structured analyses. (author)

  11. Accelerating residential PV expansion: supply analysis for competitive electricity markets

    International Nuclear Information System (INIS)

    Payne, Adam; Williams, Robert H.; Duke, Richard

    2001-01-01

    Photovoltaic (PV) technology is now sufficiently advanced that market support mechanisms such as net metering plus a renewable portfolio standard (RPS) could induce rapid PV market growth in grid-connected applications. With such support mechanisms, markets would be sufficiently large that manufacturers could profitably build and operate 100 MW p /yr PV module factories, and electricity costs for residential rooftop PV systems would compare favorably with residential electricity prices in certain areas (e.g., California and the greater New York region in the US). This prospect is illustrated by economic and market analyses for one promising technology (amorphous silicon thin-film PV) from the perspectives of both module manufacturers and buyers of new homes with rooftop PV systems. With public policies that reflect the distributed and environmental benefits offered by PV-and that can sustain domestic PV market demand growth at three times the historical growth rate for a period of the order of two decades - PV could provide 3% of total US electricity supply by 2025. (Author)

  12. Nuclear reactor development in China for non-electrical applications

    International Nuclear Information System (INIS)

    Sun Yuliang; Zhong Daxin; Dong Duo; Xu Yuanhui

    1998-01-01

    In parallel to its vigorous program of nuclear power generation, China has attached great importance to the development of nuclear reactors for non-electrical applications. The Institute of Nuclear Energy Technology (INET) in Beijing has been developing technologies of the water-cooled heating reactor and the modular high temperature gas-cooled reactor. In 1989, a 5 MW water cooled test reactor was erected. Currently, an industrial demonstration nuclear heating plant is being projected. Feasibility studies are being made of sea-water desalination using the INET developed nuclear heating reactor as heat source. Also, a 10 MW high temperature gas-cooled test reactor is being constructed at INET in the framework of China's national high-tech program. The paper gives an overview of China's energy market situation. With respect to China's technology development of high temperature gas-cooled reactors and water cooled heating reactors, the paper describes some general requirements on the technical development, reviews the national programs and activities, describes briefly the design and safety features of the reactor concepts, discusses aspects of application potentials. (author)

  13. Gas supply planning for new gas-fired electricity generation facilities

    International Nuclear Information System (INIS)

    Slocum, J.C.

    1990-01-01

    This paper explores several key issues in gas supply planning for new gas fired electric generation facilities. This paper will have two main sections, as follows: developing the gas supply plan for a gas-fired electricity generation facility and exploring key gas supply contract pricing issues

  14. Shutdown risk management applied at Philadelphia Electric Company

    International Nuclear Information System (INIS)

    Dagan, William J.; True, Douglas E.; Wilson, Thomas; Truax, William

    2004-01-01

    The development and implementation of an effective risk management program requires basic risk or safety knowledge and the conversion of such information into effective management tools. ERIN Engineering and Research, Inc., under contract to the Electric Power Research Institute, has developed an effective program. Outage Risk Assessment and Management (ORAM), to provide plant and management personnel with understandable results of shutdown risk studies. With this tool, the impact of plans and decision options can be readily determined and displayed for the decision maker. This paper describes these methods and their application to the Limerick Nuclear Station of Philadelphia Electric Company. It also sets forth a broader application of these methods to include support of management decisions at-power and following forced outages. The result is an integrated risk management framework which can allow management and technical personnel to utilize readily available and understandable risk insights to optimize each activity. This paper addresses the resolution of several key issues in detail: How was the ORAM risk management method employed to represent the existing plant shutdown procedures and policies? How did the ORAM risk management method enhance the decision-making ability of the outage management staff? How was the ORAM software efficiently integrated with the outage scheduling software? How is quantitative risk information generated and used for outage planning and control? The ORAM risk management philosophy utilizes a series of colors to depict various risk configurations. Each such configuration has associated with it clear guidance. By modifying the conditions existing in the plant it is possible to impact the type of risk being encountered as well as the guidance which is appropriate for that period. In addition, the duration of a particular configuration can be effectively managed to reduce the overall risk impact. These are achieved with minimal

  15. Status report on nuclear reactors for space electric power

    International Nuclear Information System (INIS)

    Buden, D.

    1978-01-01

    The Los Alamos Scientific Laboratory is studying reactor power plants for space applications in the late 1980s and 1990s. The study is concentrating on high-temperature, compact, fast reactors that can be coupled with various radiation shielding systems and thermoelectric, dynamic, or thermionic electric power conversion systems, depending on the mission. Increased questions have been raised about safety since the COSMOS 954 incident. High orbits (above 400 to 500 nautical miles) have sufficient lifetimes to allow radioactive elements to decay to safe levels. The major proposed applications for satellites with reactors in Earth orbit are in geosynchronous orbit (19,400 nautical miles). In missions at geosynchronous orbit where orbital lifetimes are practically indefinite, the safety considerations are negligible. The potential missions, why reactors are being considered as a prime power candidate, reactor features, and safety considerations are discussed

  16. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  17. Analysis of the General Electric Company swell tests with RELAP4/MOD7

    International Nuclear Information System (INIS)

    Fischer, S.R.; Hendrix, C.E.

    1979-01-01

    The RELAP4/MOD7 nuclear reactor transient analysis code, presently being developed by EG and G Idaho, Inc., will incorporate several significant improvements over earlier versions of RELAP4. As part of the development of RELAP4/MOD7, a thorough assessment of the capability of the code to simulate water reactor LOCA phenomena is being made. This assessment is accomplished in part by comparing results from code calculations with test data from experimental facilities. Simulations of the General Electric Company (GE) level swell tests were performed as part of the code checkout. In these tests, a pressurized vessel partially filled with nearly saturated water was blown down through a simulated break located near the top of the vessel. Comparison of RELAP4 calculations with data from these experiments indicates that the code has the capability to model the unequal phase velocity flow and resulting density gradients that might occur in a BWR steam line break transient. Comparisons of RELAP4 calculations with data from two level swell experiments are presented

  18. Utilization of nuclear energy for generating electric power in the FRG, with special regard to LWR-type reactors

    International Nuclear Information System (INIS)

    Vollradt, J.

    1977-01-01

    Comments on interdependencies in energy industry and energy generation as seen by energy supply utilities, stating that the generation of electric power in Germany can only be based on coal and nuclear energy in the long run, are followed by the most important, fundamental, nuclear-physical, technological and in part political interdependencies prevailing in the starting situation of 1955/58 when the construction of nuclear power plant reactors began. Then the development ranging to the 28000 MW nuclear power output to be expected in 1985 is outlined, totalling in 115000 MW electric power in the FRG. Finally, using the respectively latest order, the technical set up of each of the reactor types with 1300 MWe unit power offered by German manufacturers are described: BBC/BBR PWR-type reactor Neupotz, KWU-PWR-type reactor Hamm and KWU PWR-type reactor double unit B+C Gundremmingen. (orig.) [de

  19. Non-electric Applications of Fast Reactors

    International Nuclear Information System (INIS)

    Safa, Henri; Borgard, Jean-Marc

    2013-01-01

    Conclusions: → Most of industrial applications (80%) require low temperature heat below 540°C; → Fast Reactors are technically suitable to provide industrial steam at temperatures not accessible by standard LWRs; → As an illustrative example, the application at an oil refinery site has been studied showing the economic benefits; → Nuclear Cogeneration enhances the overall energy efficiency of the power plant; • Nuclear Cogeneration allows massive cut in CO 2 emissions

  20. Operation and maintenance experience at the General Atomic Company's TRIGA reactor facility at San Diego, California

    International Nuclear Information System (INIS)

    Whittemore, W.L.; Stout, W.A.; Shoptaugh, J.R.; Chesworth, R.H.

    1982-01-01

    Since the startup of the original 250 kW TRIGA Mark I reactor in 1958, General Atomic Company has accumulated nearly 24 years of operation and maintenance experience with this type of reactor. In addition to the nearly 24 years of experience gained on the Mark I, GA has operated the 1.5 MW Advanced Prototype Test Reactor (Mark F) for 22 years and operated a 2 MW below-ground TRIGA Mark III for five years. Information obtained from normal and abnormal operation are presented. (author)

  1. Future view of electric power supply techniques. Distribution techniques

    Energy Technology Data Exchange (ETDEWEB)

    Ito, Toshio

    1988-06-20

    Present situations surrounding the power distribution are described, and the problems and future trend of the power distribution are reviewed. It is described for the situations that the gravity of a power demand is transfering from industrial use to home use and the dependence on electrical energy is increasing. It is pointed out for the features that the distribution system exists on not only supply side but also customer side, the system is complicated and two-dimentional, and there is a tremendous amount of facility. High voltage, high frequency and automatic distribution, and the distributed power sources such as fuel cells are described in terms of the problems to ensure the power supply. The protection and decreasing of service interruptions, the protection of harmonic wave, and long-life equipments are described in terms of the problems to ensure the power quality. As for the problems to ensure a comfortable life and space, the communication system using the distribution system for a customer service or automatic operation in a house, and the enviromental harmony by a small facility or underground distribution are described. (1 tab)

  2. The electricity supply industry in Queensland, financial report 1982/83

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    This fourth financial report deals with the finances of the electricity supply industry and includes three sections. Section 1: letter to the minister; scope of the report; the Commission; the electricity authorities; forecasts; tariff policy; and the Queensland Electricity Supply Industry Superannuation Board. Section 2: consolidated schedules; and audited financial statements. Section 3: statistics; including production, distribution, consumption, financial, accidents, towns and locations.

  3. Analysis of the electricity supply-demand balance during the winter of 2008-2009: moderate risk of supply disruption

    International Nuclear Information System (INIS)

    2008-10-01

    Twice a year, RTE publishes a forecast study of the electricity supply and demand in continental France for the summer and winter periods. The study is based on the information supplied by electric utilities concerning the expected availability of power generation means and on statistical meteorological models. Safety margins are calculated using thousands of probabilistic scenarios combining various production and consumption situations. This report is the forecast study for the winter of 2008-2009

  4. 77 FR 74125 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2012-12-13

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Company (GE) CF34-8C and CF34-8E turbofan engines with certain part numbers (P/N) of operability bleed... received reports of three failure events of OBV ring lock fuel fittings on GE CF34-8C turbofan engines. Two...

  5. Dynamic Response Testing in an Electrically Heated Reactor Test Facility

    Science.gov (United States)

    Bragg-Sitton, Shannon M.; Morton, T. J.

    2006-01-01

    Non-nuclear testing can be a valuable tool in development of a space nuclear power or propulsion system. In a non-nuclear test bed, electric heaters are used to simulate the heat from nuclear fuel. Standard testing allows one to fully assess thermal, heat transfer, and stress related attributes of a given system, but fails to demonstrate the dynamic response that would be present in an integrated, fueled reactor system. The integration of thermal hydraulic hardware tests with simulated neutronic response provides a bridge between electrically heated testing and full nuclear testing. By implementing a neutronic response model to simulate the dynamic response that would be expected in a fueled reactor system, one can better understand system integration issues, characterize integrated system response times and response characteristics, and assess potential design improvements at a relatively small fiscal investment. Initial system dynamic response testing was demonstrated on the integrated SAFE-100a heat pipe cooled, electrically heated reactor and heat exchanger hardware, utilizing a one-group solution to the point kinetics equations to simulate the expected neutronic response of the system (Bragg-Sitton, 2005). The current paper applies the same testing methodology to a direct drive gas cooled reactor system, demonstrating the applicability of the testing methodology to any reactor type and demonstrating the variation in system response characteristics in different reactor concepts. In each testing application, core power transients were controlled by a point kinetics model with reactivity feedback based on core average temperature; the neutron generation time and the temperature feedback coefficient are provided as model inputs. Although both system designs utilize a fast spectrum reactor, the method of cooling the reactor differs significantly, leading to a variable system response that can be demonstrated and assessed in a non-nuclear test facility.

  6. Different approaches to supply adequacy in electricity markets

    International Nuclear Information System (INIS)

    Rosellon, J.

    2006-01-01

    There is a growing concern that liberalized electricity markets may not provide incentives for sufficient investment in generation capacity to meet future demand. This is problematic because electricity markets are characterized by short-term inelastic demand in which the long-term supply-demand balance cannot be achieved through a market-clearing price. Also, final consumers do not feel the need to engage in long-term contracts because they are usually isolated from spot prices by regulated tariffs. This paper presented some of the measures that have been proposed internationally to ensure a sufficient amount of generation capacity reserves. Measures such as strategic reserves, capacity payments, capacity requirements and call options were analyzed in terms of their degree of centralization or decentralization with regards to the amount of capacity and the price of capacity. Each one of these measures was analyzed in this paper to clarify their theoretical aspects as well as their international application and assessment. The analytical and practical strengths and weaknesses of each approach were discussed. Capacity payments and requirements alone were found to be inadequate both in theory and practice. It was suggested that capacity payments or requirements might work efficiently if combined with risk management approaches and hedging instruments that promote demand side participation. Regulatory intervention would then be focused on promoting rules that facilitate liquid markets for energy futures and risk management. 37 refs., 2 tabs., 3 figs

  7. Supply security and short-run capacity markets for electricity

    International Nuclear Information System (INIS)

    Creti, Anna; Fabra, Natalia

    2007-01-01

    The creation of electricity markets has raised the fundamental question as to whether markets create the right incentives for the provision of the reserves needed to maintain supply security in the short-run, or whether some form of regulation is required. In some states in the US, electricity distributors have been made responsible for providing such reserves by contracting capacity in excess of their forecasted peak demand. The so-called Installed Capacity Markets provide one means of contracting reserves, and are the subject of this paper. Under monopoly as well as under perfect competition, we identify firms' short-run opportunity costs of committing resources in the capacity market and the costs of inducing full capacity commitment. The long-run investment problem is not considered. From a welfare viewpoint, we also compare the desirability of providing reserves either through capacity markets or through the demand side (i.e. power curtailments). At the optimum, capacity obligations equal peak demand (plus expected outages) and the capacity deficiency rate (which serves as a price cap) is set at firms' opportunity costs of providing full capacity commitment. (Author)

  8. Different approaches to supply adequacy in electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    Rosellon, J. [Centro de Investigacion y Dcencia Economicas, Mexico City (Mexico)

    2006-10-01

    There is a growing concern that liberalized electricity markets may not provide incentives for sufficient investment in generation capacity to meet future demand. This is problematic because electricity markets are characterized by short-term inelastic demand in which the long-term supply-demand balance cannot be achieved through a market-clearing price. Also, final consumers do not feel the need to engage in long-term contracts because they are usually isolated from spot prices by regulated tariffs. This paper presented some of the measures that have been proposed internationally to ensure a sufficient amount of generation capacity reserves. Measures such as strategic reserves, capacity payments, capacity requirements and call options were analyzed in terms of their degree of centralization or decentralization with regards to the amount of capacity and the price of capacity. Each one of these measures was analyzed in this paper to clarify their theoretical aspects as well as their international application and assessment. The analytical and practical strengths and weaknesses of each approach were discussed. Capacity payments and requirements alone were found to be inadequate both in theory and practice. It was suggested that capacity payments or requirements might work efficiently if combined with risk management approaches and hedging instruments that promote demand side participation. Regulatory intervention would then be focused on promoting rules that facilitate liquid markets for energy futures and risk management. 37 refs., 2 tabs., 3 figs.

  9. Effects of regulatory reforms in the electricity supply industry on electricity prices in developing countries

    International Nuclear Information System (INIS)

    Nagayama, Hiroaki

    2007-01-01

    Electric power sector reforms in the electricity supply industry have had an impact on industrial and household prices in developing countries in Latin America, the former Soviet Union, and Eastern Europe. Using original panel data for 83 countries during the period from 1985 to 2002, we examine how each policy instrument of the reform measures influenced electricity prices for countries in the above regions. We found that variables such as entry of independent power producers (IPP), unbundling of generation and transmission, establishment of a regulatory agency, and the introduction of a wholesale spot market have had a variety of impacts on electricity prices, some of which were not always consistent with expected results. The research findings suggest that neither unbundling nor introduction of a wholesale pool market on their own necessarily reduces the electric power price. In fact, contrary to expectations, there was a tendency for the price to rise. However, coexistent with an independent regulator, unbundling may work to reduce electricity prices. Privatization and the introduction of foreign IPP and retail competition lower electricity prices in some regions, but not all

  10. Safety Evaluation Report related to the renewal of the operating license for the General Electric-Nuclear Test Reactor (GE-NTR) (Docket No. 50-73)

    International Nuclear Information System (INIS)

    1984-09-01

    This Safety Evaluation Report for the application filed by the General Electric Company (GE) for a renewal license number R-33 to continue to operate its research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by GE and is located in Pleasanton, California. The staff concludes that the reactor can continue to be operated by GE without endangering the health and safety of the public

  11. Operation of high-current connections for the electric supply of conurbations

    Energy Technology Data Exchange (ETDEWEB)

    Ambrosch, H; Krause, D

    1975-01-01

    The suitability of superconducting cables for the electric power supply of a large town is investigated on the basis of technical and economic parameters and from the point of view of the power supply.

  12. 76 FR 69713 - Application To Export Electric Energy; BP Energy Company

    Science.gov (United States)

    2011-11-09

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-314-A] Application To Export Electric Energy; BP Energy.... SUMMARY: BP Energy Company (BP Energy) has applied to renew its authority to transmit electric energy from... electric energy from the United States to Mexico as a power marketer for a five-year term using existing...

  13. 76 FR 69712 - Application To Export Electric Energy; BP Energy Company

    Science.gov (United States)

    2011-11-09

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-315-A] Application To Export Electric Energy; BP Energy.... SUMMARY: BP Energy Company (BP Energy) has applied to renew its authority to transmit electric energy from... BP Energy to transmit electric energy from the United States to Canada as a power marketer for a five...

  14. 17 CFR 250.7 - Companies deemed not to be electric or gas utility companies.

    Science.gov (United States)

    2010-04-01

    ... status afforded by paragraph (b)(1) of this section, any such company shall file with this Commission a... a statement of receipts and expenditures for such year and of financial status at its end. (3) As a prerequisite to retaining the status afforded by paragraph (b)(1) of this section, any such company shall...

  15. 78 FR 3470 - DTE Electric Company (Formerly the Detroit Edison Company), Notice of Availability of Final...

    Science.gov (United States)

    2013-01-16

    ...--specific Web page at http://www.nrc.gov/reactors/new-reactors/col/fermi.html . The Ellis Library and... possesses and are publicly-available, using any of the following methods: Federal Rulemaking Web site: Go to... Documents Access and Management System (ADAMS): You may access publicly-available documents online in the...

  16. The roles of ozone and zeolite on reactive dye degradation in electrical discharge reactors.

    Science.gov (United States)

    Peternel, L; Kusic, H; Koprivanac, N; Locke, B R

    2006-05-01

    In this study high voltage pulsed corona electrical discharge advanced oxidation processes (AOPs) were applied to bleach and degrade C.I. Reactive Green 8 and C.I. Reactive Red 45 organic dyes in water solutions. Two types of hybrid gas/liquid high voltage electrical discharge (corona) reactors, known as hybrid series and hybrid parallel were studied. The difference between these reactors relates to electrode configuration, which affects the amounts of ozone, hydrogen peroxide and hydroxyl radicals produced. Experiments were conducted using dye concentrations of 20 mgl(-1) and 75 mgl(-1), with and without NH4ZSM5 zeolite addition in order to determine possible effects of added solid particles to total process efficiency. The role of ozone in combination with zeolites was assessed through comparative direct ozonation experiments with ozone supplied by an ozone generator. UV/VIS spectrophotometric measurements and measurements of total organic carbon (TOC) were used for the determination of decolorization and mineralization rates.

  17. Electrical cabling system associated at a nuclear reactor

    International Nuclear Information System (INIS)

    Dejeux, P.; Desfontaines, G.

    1988-01-01

    This cabling system for an electrical device in a nuclear reactor comprises at least a first cable issued of the device, a second cable comprising a first portion, a second portion and a third portion joining the second by a multiple quick fitting connector capable to connect at least ten second portions at ten other third portions of the second cable [fr

  18. Electrical insulators for the theta-pinch fusion reactor

    International Nuclear Information System (INIS)

    Clinard, F.W. Jr.

    1976-01-01

    The five major applications for electrical insulators in the Reference Theta Pinch Reactor are as follows: (1) first-wall insulator, (2) blanket intersegment insulator, (3) graphite encapsulating insulator, (4) implosion coil insulator, and (5) compression coil insulator. Insulator design proposals and some preliminary test results are given for each application

  19. The roles of information technology in global chain supply: a multiple case study of multinational companies of China

    Science.gov (United States)

    He, Mao; Duan, Wanchun

    2007-12-01

    Nowadays many Chinese companies have being becoming more and more international. Therefore, these Chinese companies have to face global supply chains rather than the former domestic ones. The use of information technology (IT) is considered a prerequisite for the effective control of today's complex global supply chains. Based on empirical data from 10 multinational companies of China, this paper presents a classification of the ways in which companies use IT in SCM, and examines the drivers for these different utilization types. According to the findings of this research, the purposes of using of IT in SCM can be divided into 1) transaction processing, 2) supply chain planning and collaboration, and 3) order tracking and delivery coordination. The findings further suggest that the drivers between these three uses of IT in SCM differ.

  20. Becoming a First Mover in Green Electricity Supply: Corporate Change Driven by Liberalisation and Climate Change

    NARCIS (Netherlands)

    Hofman, Peter

    2003-01-01

    This paper presents a study of a trend-setting company in the electricity sector in the Netherlands and its innovative response to the combined influence of liberalisation and climate change. The company became a first mover through its invention of the concept of green electricity and the

  1. 78 FR 21578 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-04-11

    ... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed... Company (GE) model GEnx-2B67 and GEnx-2B67B turbofan engines with booster anti-ice (BAI) air duct, part... GE model GEnx-2B67 and GEnx- 2B67B turbofan engines with BAI air duct, P/N 2469M32G01, and support...

  2. Regulatory review and barriers for the electricity supply system for distributed generation in EU-15

    DEFF Research Database (Denmark)

    Ropenus, Stephanie; Skytte, Klaus

    2005-01-01

    When distributed electricity supply surpasses a particular level, it can no longer be ignored in planning and operation of the electricity networks. Therefore, improvements of the regulatory framework of the electricity networks are required along with the growth of the electricity supply from di...... distributed generation. This paper reviews the current regulation of the grids with respect to distributed generation in EU-15 Member States and compares the different systems. Several barriers are identified.......When distributed electricity supply surpasses a particular level, it can no longer be ignored in planning and operation of the electricity networks. Therefore, improvements of the regulatory framework of the electricity networks are required along with the growth of the electricity supply from...

  3. Ten-year statistics of the electric power supply. Status and tendencies

    International Nuclear Information System (INIS)

    2000-12-01

    The ten-year statistics of the electric power supply in Denmark for 1990-1999 presents in tables and figures the trend of the electric power supply sector during the last ten years. The tables and figures present information on total energy consumption, combined heat and power generation, fuel consumption and the environment, the technical systems, economy and pricing, organization of the electricity supply, auto-production of electricity and information on electricity prices and taxes for households and industry in various countries. (LN)

  4. The development of power generation by electricity supply undertakings and industries in Western Europe

    International Nuclear Information System (INIS)

    Cura, H.

    1998-01-01

    Following the events of recent years - the opening up of the east, efforts to stimulate international competition - the Western European electricity industry is strongly on the move. In spite of the non-uniformity of the electricity supply structures in the individual countries, the trend towards liberalization of the electricity market is characterized by different forms of expression. Against this background, this paper provides a review of the status and prospects of electricity demand developments and of primary energy supply. It considers the consequences which thereby arise for the power plant inventory of electricity supply undertakings and industries. (orig.) [de

  5. Electric power supply and demand for the contiguous United States, 1980-1989

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-06-01

    A limited review is presented of the outlook for the electric power supply and demand during the period 1980 to 1989. Only the adequacy and reliability aspects of bulk electric power supply in the contiguous US are considered. The economic, financial and environmental aspects of electric power system planning and the distribution of electricity (below the transmission level) are topics of prime importance, but they are outside the scope of this report.

  6. L'Anse Warden Electric Company Boiler Number One Emission Test Report – March 2017

    Science.gov (United States)

    L’Anse Warden Electric Company (LWEC) submitted results from an emission test on the Boiler No. 1 stack. Stack air emission testing was conducted in March 2017, and the report became available in June 2017

  7. L'Anse Warden Electric Company Boiler Number One Emission Test Report – December 2016

    Science.gov (United States)

    L’Anse Warden Electric Company (LWEC) submitted results from an emission test on the Boiler No. 1 stack. Stack air emission testing was conducted in December 2016, and the report became available in January 2017

  8. L'Anse Warden Electric Company Boiler Number One Emission Test Report – July 2016

    Science.gov (United States)

    L’Anse Warden Electric Company (LWEC) submitted results from an emission test on the Boiler No. 1 stack. Stack air emission testing was conducted in July 2016, and the report became available in August 2016.

  9. L'Anse Warden Electric Company Boiler Number One Emission Test Report – June 2017

    Science.gov (United States)

    L’Anse Warden Electric Company (LWEC) submitted results from an emission test on the Boiler No. 1 stack. Stack air emission testing was conducted in March 2017, and the report became available in June 2017

  10. Interim report by a Committee on Demands and Supplies of Electric Enterprise Council

    International Nuclear Information System (INIS)

    1984-01-01

    An interim report by a committee on demands and supplies, Electric Enterprise Council, was given for the period up to the year 2000. The demands of electric power in Japan were set as 658,000 million kWh for 1990 and 768,000 million kWh for 1995. The electric power enterprises appear to be at a major turning point at present, that is, the growth in the demands tended to slow down. The features of the situation are then the stabilized supply, supply cost reduction, reasonable power source constitution, etc. The following things are described. Background and policy; power demand outlook and supply measures; power supply and supply efficiency (the composition of power sources, respective power sources with supply targets and problems, etc.); power demand/supply outlook for 2000. (Mori, K.)

  11. Electricity supply, employment and real GDP in India: evidence from cointegration and Granger-causality tests

    International Nuclear Information System (INIS)

    Ghosh, Sajal

    2009-01-01

    This study probes nexus between electricity supply, employment and real GDP for India within a multivariate framework using autoregressive distributed lag (ARDL) bounds testing approach of cointegration. Long-run equilibrium relationship has been established among these variables for the time span 1970-71 to 2005-06. The study further establishes long- and short-run Granger causality running from real GDP and electricity supply to employment without any feedback effect. Thus, growth in real GDP and electricity supply are responsible for the high level of employment in India. The absence of causality running from electricity supply to real GDP implies that electricity demand and supply side measures can be adopted to reduce the wastage of electricity, which would not affect future economic growth of India.

  12. Law of the electricity sector in France. The legal framework for the French electricity supply between legal market deregulation requirements and public service obligations

    International Nuclear Information System (INIS)

    Buckler, Julius

    2016-01-01

    The process of creating an internal electricity market is still unfinished. This has, in addition to technical reasons, also legal reasons: The persistence of the structures and regulatory frameworks that have grown during monopoly times, in part is very strong, which is particularly evident in France. The power supply there is intensively controlled by its state as a public service, both indirectly by the state-owned company EDF and directly by statutory regulations. The market deregulation is not thereby completely prevented. However, together with the particular importance of nuclear power for the French power supply, considerable barriers to market opening are emerging. Against this background and out of the historical development, the author examines the current French law of the electricity sector across all value-creation stages in its relations to EU law. [de

  13. Space reactor electric systems: system integration studies, Phase 1 report

    International Nuclear Information System (INIS)

    Anderson, R.V.; Bost, D.; Determan, W.R.; Harty, R.B.; Katz, B.; Keshishian, V.; Lillie, A.F.; Thomson, W.B.

    1983-01-01

    This report presents the results of preliminary space reactor electric system integration studies performed by Rockwell International's Energy Systems Group (ESG). The preliminary studies investigated a broad range of reactor electric system concepts for powers of 25 and 100 KWe. The purpose of the studies was to provide timely system information of suitable accuracy to support ongoing mission planning activities. The preliminary system studies were performed by assembling the five different subsystems that are used in a system: the reactor, the shielding, the primary heat transport, the power conversion-processing, and the heat rejection subsystems. The subsystem data in this report were largely based on Rockwell's recently prepared Subsystem Technology Assessment Report. Nine generic types of reactor subsystems were used in these system studies. Several levels of technology were used for each type of reactor subsystem. Seven generic types of power conversion-processing subsystems were used, and several levels of technology were again used for each type. In addition, various types and levels of technology were used for the shielding, primary heat transport, and heat rejection subsystems. A total of 60 systems were studied

  14. Decentralised energy supply as a market opportunity for small and middle-sized companies

    International Nuclear Information System (INIS)

    Hawkins, A. C.

    1999-01-01

    So far, the heating and sanitary industry has been active in energy applications. Energy supply was a business for big energy utilities and international combinations. However, this may be soon belong to the past, as pointed out by a conference at the University of St. Gallen (HSG) dealing with the prospects for the energy market and its actors. The electric utilities increasingly look at the decentralised energy production as an interesting opportunity for them, especially if it may be combined with a local district heating network (cogeneration). New technologies are emerging here: gas and vapor turbine power plants with an electric power of 1 MW or higher; fuel cells. However, the production number of these new devices and equipment's is not yet as high as the equivalent conventional equipments available from the market today [de

  15. The single European energy market: the electricity supply sector

    International Nuclear Information System (INIS)

    Halliwell, A.A.

    1991-01-01

    The completion of the Internal Market in the Community by the end of 1992 has become a key objective and the focal point of the revival of the European Community. Within this overall objective, the development of the Single European Energy Market, the Internal Energy market, is a major element. The energy objectives for the Community, adopted in 1986 by the Council of Ministers and relating to targets in the energy sector to be achieved by 1995, contain what are effectively the aims of the Internal Energy Market. This is in a reference to the need for greater integration, free from barriers to trade, of the Internal Energy Market with a view to improving security of supply, reducing costs and improving economic competitiveness. In the light of these aims, the Commission drew up, in 1988, an inventory of potential obstacles to the achievement of the Internal Energy Market. This was accepted by the Council, together with a list of suggested priority areas of work, and has formed the basis of the Commission's efforts to move forward as quickly as possible in the development of the Internal Energy Market, in all branches of the energy sector. The impact on the electricity sector, in particular, is considered here. (author)

  16. Privatization of British electricity supply industry: Critical analysis

    International Nuclear Information System (INIS)

    Cervigni, G.

    1993-01-01

    Until 1989, despite the partially disintegrated organization of the British electricity supply industry (ESI) and the attempt of the Energy Act of 1983 to pull down entrance barriers to the power generation business, ESI operated like an integrated monopoly. Between 1989 and 1990, ESI has been subjected to a reorganization process and transfer to the private sector with the declared aim of improving short and long run micro-economic efficiency. For this purpose, the attempt of introducing competition in the phases of the production process where possible and of regulating those which are structurally non competitive, has been made. The new configuration of ESI in terms of organizational structure, property regime and regulatory system is analyzed. Areas of improvement of the regulatory system and delayed key decisions of the public operator, are identified. However, any evaluation of the process as a whole can only relate to a minor part of the present situation; thus it subtends a scenary for the future, where the role of the regulatory authority is crucial

  17. Social responsibility in tobacco production? Tobacco companies' use of green supply chains to obscure the real costs of tobacco farming.

    Science.gov (United States)

    Otañez, Marty; Glantz, Stanton A

    2011-11-01

    Tobacco companies have come under increased criticism because of environmental and labour practices related to growing tobacco in developing countries. Analysis of tobacco industry documents, industry websites and interviews with tobacco farmers in Tanzania and tobacco farm workers, farm authorities, trade unionists, government officials and corporate executives from global tobacco leaf companies in Malawi. British American Tobacco and Philip Morris created supply chains in the 1990 s to improve production efficiency, control, access to markets and profits. In the 2000s, the companies used their supply chains in an attempt to legitimise their portrayals of tobacco farming as socially and environmentally friendly, rather than take meaningful steps to eliminate child labour and reduce deforestation in developing countries. The tobacco companies used nominal self-evaluation (not truly independent evaluators) and public relations to create the impression of social responsibility. The companies benefit from $1.2 billion in unpaid labour costs because of child labour and more than $64 million annually in costs that would have been made to avoid tobacco-related deforestation in the top 12 tobacco growing developing countries, far exceeding the money they spend nominally working to change these practices. The tobacco industry uses green supply chains to make tobacco farming in developing countries appear sustainable while continuing to purchase leaf produced with child labour and high rates of deforestation. Strategies to counter green supply chain schemes include securing implementing protocols for the WHO Framework Convention on Tobacco Control to regulate the companies' practices at the farm level.

  18. Generation Adequacy Report on the electricity supply-demand balance in France - 2017 Edition. Reference document

    International Nuclear Information System (INIS)

    2018-01-01

    In accordance with French legislation, each year RTE drafts and publishes the 'Generation Adequacy Report' concerning the supply demand balance of electricity. As a diagnostic reference for security of supply and of the electric network, the report is a key corporate exercise which is used to shed light on the medium to long term forecasts for security of supply, and therefore to develop national energy policies. This 2017 report presents: 1 - the power consumption and its perspectives according to the correct implementation of energy efficiency actions; 2 - the power generation park with scenarios integrating a public control and a modeling of the economic decisions of competing actors; 3 - A realistic European power trade vision integrating energy policy uncertainties of neighboring countries; 4 - The five next year analysis: a tight balance with necessary choices; 5 - the 'Ohm' scenario: an unprecedented adaptation of the production park to meet the nuclear share law goal; 6 - The 'Ampere' scenario for a reduction of nuclear production following the rhythm of renewable energy sources development; 7 - The 'Hertz' scenario with a development of thermal means to accelerate the nuclear phasing out without CO 2 emissions increase; 8 - The 'Volt' scenario for a sustained development of renewable energy sources together with an evolution of the nuclear park adapted to the European economic opportunities; 9 - The 'Watt' scenario for an automatic decommissioning of reactors after 40 years of operation; 10 - Self-consumption development and the transformation of the power system under the effect of investment decision decentralization; 11 - Cross-analysis of scenarios: the 2030-2035 power system has to be decided today

  19. Contracts on electric power supply set up between communities (communal associations, countries) and public electricity utilities

    Energy Technology Data Exchange (ETDEWEB)

    Hedrich, B

    1976-01-01

    There is not any original communal right to energy supply for the population. The affiliation of local power supply to the local administration cannot be justified either by the public purpose of service or by the term provision of existence. The utilities do not get a communal license when getting the so-called licensing contract. According to its legal nature, the licensing contract is a mixture of legal positions composed of elements of the civil law and the public law. (Administrative lawsuit). The so-called power supply contract is a mutual legal relationship under civil law on the utilization of electric power, made to last. (Permanent obligation for utilization). When concluding both contracts, it is a matter of economic activities undertaken by the communities. Fiscal considerations are in the foreground. Legal regulations concerning roads and distances and serving as starting points for concluding a licensing contract are alien to the system and are to be abolished. Communities should only be responsible for local energy supply on a basis under public law. In lieu of it a stronger obligation to be met by large utilities ought to be ensured by ties under public law.

  20. A study of sodium-cooled fast breeder reactor with thorium blanket for supply of U-233 to high temperature gas cooled reactor

    International Nuclear Information System (INIS)

    Yoshida, H.; Nishimura, H.; Osugi, T.

    1978-08-01

    Symbiotic energy system between fast breeder reactor and thermal reactor would have a potential merit for nuclear proliferation problem. And when using HTGR as the thermal reactor in the system, the energy system appears to be promising as an energy system self-sufficient in fuels, which can generate both electricity and high temperature process heat. In the system the fast breeder reactor has to supply sufficient amount of fissile plutonium to keep the reactor going, and also produce U-233 necessary to the associated U-233 fuelled process heat production HTGR. Three types of LMFBR concepts with thorium blanket, conventional homogeneous core LMFBR, and axial and radial parfait heterogeneous core LMFBRs, have been investigated to find out suitable configurations of LMFBR for supply of U-233 to the HTGR with relatively high conversion ratio of 0.85, in the symbiotic energy system between LMFBR and HTGR. The investigation on LMFBR has been made on fuel sufficiency of the system, inherent safety such as sodium-void and Doppler coefficients, and fuel cycle cost. The followings were revealed; (1) Conventional homogeneous core LMFBR with thorium radial blanket well satisfies the condition of fuel sufficiency, if adequate radial blanket thickness is chosen. However, the sodium-void coefficient and fuel cycle cost are inferior to the other concepts. (2) Axial parfait heterogeneous core LMFBR can be regarded as one of the best LMFBR concepts installed in the symbiotic energy system, from the viewpoints of fuel sufficiency, inherent safety and fuel cycle cost. However, further investigations should be needed on reliability and operationability of the concept. (3) Radial parfait heterogeneous core LMFBR seems inadequate as the LMFBR in the system, because the configurations based on this concept does not satisfy plutonium and U-233 breedings, simultaneously. This LMFBR concept, however, has excellent breeding performance in the internal radial blanket. So further

  1. Influence of power supply on the generation of ozone and degradation of phenol in a surface discharge reactor

    International Nuclear Information System (INIS)

    Zhao, Yan; Shang, Kefeng; Duan, Lijuan; Li, Yue; An, Jiutao; Zhang, Chunyang; Lu, Na; Wu, Yan; Li, Jie

    2013-01-01

    A surface Dielectric Barrier Discharge (DBD) reactor was utilized to degrade phenol in water. Different power supplies applied to the DBD reactor affect the discharge modes, the formation of chemically active species and thus the removal efficiency of pollutants. It is thus important to select an optimized power supply for the DBD reactor. In this paper, the influence of the types of power supplies including alternate current (AC) and bipolar pulsed power supply on the ozone generation in a surface discharge reactor was measured. It was found that compared with bipolar pulsed power supply, higher energy efficiency of O 3 generation was obtained when DBD reactor was supplied with 50Hz AC power supply. The highest O 3 generation was approximate 4 mg kJ −1 ; moreover, COD removal efficiency of phenol wastewater reached 52.3% after 3 h treatment under an AC peak voltage of 2.6 kV.

  2. Influence of power supply on the generation of ozone and degradation of phenol in a surface discharge reactor

    Science.gov (United States)

    Zhao, Yan; Shang, Kefeng; Duan, Lijuan; Li, Yue; An, Jiutao; Zhang, Chunyang; Lu, Na; Li, Jie; Wu, Yan

    2013-03-01

    A surface Dielectric Barrier Discharge (DBD) reactor was utilized to degrade phenol in water. Different power supplies applied to the DBD reactor affect the discharge modes, the formation of chemically active species and thus the removal efficiency of pollutants. It is thus important to select an optimized power supply for the DBD reactor. In this paper, the influence of the types of power supplies including alternate current (AC) and bipolar pulsed power supply on the ozone generation in a surface discharge reactor was measured. It was found that compared with bipolar pulsed power supply, higher energy efficiency of O3 generation was obtained when DBD reactor was supplied with 50Hz AC power supply. The highest O3 generation was approximate 4 mg kJ-1 moreover, COD removal efficiency of phenol wastewater reached 52.3% after 3 h treatment under an AC peak voltage of 2.6 kV.

  3. Electric power from near-term fusion reactors

    International Nuclear Information System (INIS)

    Longhurst, G.R.; Deis, G.A.; Miller, L.G.

    1981-01-01

    This paper examines requirements and possbilities of electric power production on near-term fusion reactors using low temperature cycle technology similar to that used in some geothermal power systems. Requirements include the need for a working fluid with suitable thermodynamics properties and which is free of oxygen and hydrogen to facilitate tritium management. Thermal storage will also be required due to the short system thermal time constants on near-time reactors. It is possbile to use the FED shield in a binary power cycle, and results are presented of thermodynamic analyses of this system

  4. Reliability modeling of Clinch River breeder reactor electrical shutdown systems

    International Nuclear Information System (INIS)

    Schatz, R.A.; Duetsch, K.L.

    1974-01-01

    The initial simulation of the probabilistic properties of the Clinch River Breeder Reactor Plant (CRBRP) electrical shutdown systems is described. A model of the reliability (and availability) of the systems is presented utilizing Success State and continuous-time, discrete state Markov modeling techniques as significant elements of an overall reliability assessment process capable of demonstrating the achievement of program goals. This model is examined for its sensitivity to safe/unsafe failure rates, sybsystem redundant configurations, test and repair intervals, monitoring by reactor operators; and the control exercised over system reliability by design modifications and the selection of system operating characteristics. (U.S.)

  5. Space-reactor electric systems: subsystem technology assessment

    International Nuclear Information System (INIS)

    Anderson, R.V.; Bost, D.; Determan, W.R.

    1983-01-01

    This report documents the subsystem technology assessment. For the purpose of this report, five subsystems were defined for a space reactor electric system, and the report is organized around these subsystems: reactor; shielding; primary heat transport; power conversion and processing; and heat rejection. The purpose of the assessment was to determine the current technology status and the technology potentials for different types of the five subsystems. The cost and schedule needed to develop these potentials were estimated, and sets of development-compatible subsystems were identified

  6. Situation of the supply of catering companies in the EPS of Riobamba

    Directory of Open Access Journals (Sweden)

    Roberto Naranjo-Silva

    2017-06-01

    Full Text Available The Constitution of the 2008 in Ecuador with the objective of improving the quality of its population's life, settled down to the popular and solidary economy (EPS as the fourth economic sector of the country. Studies carried out by the National Institute of Popular and Solidary Economy (IEPS from the 2009, they show problems in the development and progress of this economic sector, fundamentally in the logistics areas, marketing, production and managerial organization. This article determines the problems that are manifested in the supply of the inputs and the delivery from the products to the final consumer, of the nutritious services of the catering companies in the EPS of the canton Riobamba. It was obtained results of quantitative type through a market study, which concludes with alternatives that look for to solve the problems generated in this key sector of the Ecuadorian economy.

  7. Design of investment management optimization system for power grid companies under new electricity reform

    Science.gov (United States)

    Yang, Chunhui; Su, Zhixiong; Wang, Xin; Liu, Yang; Qi, Yongwei

    2017-03-01

    The new normalization of the economic situation and the implementation of a new round of electric power system reform put forward higher requirements to the daily operation of power grid companies. As an important day-to-day operation of power grid companies, investment management is directly related to the promotion of the company's operating efficiency and management level. In this context, the establishment of power grid company investment management optimization system will help to improve the level of investment management and control the company, which is of great significance for power gird companies to adapt to market environment changing as soon as possible and meet the policy environment requirements. Therefore, the purpose of this paper is to construct the investment management optimization system of power grid companies, which includes investment management system, investment process control system, investment structure optimization system, and investment project evaluation system and investment management information platform support system.

  8. Online calibration method for condition monitoring of nuclear reactor instrumentations based on electrical signature analysis

    International Nuclear Information System (INIS)

    Syaiful Bakhri

    2013-01-01

    Electrical signature analysis currently becomes an alternative in condition monitoring in nuclear power plants not only for stationary components such as sensors, measurement and instrumentation channels, and other components but also for dynamic components such as electric motors, pumps, generator or actuators. In order to guarantee the accuracy, the calibration of monitoring system is a necessary which practically is performed offline, under limited schedules and certain tight procedures. This research aims to introduce online calibration technique for electrical signature condition monitoring in order that the accuracy can be maintained continuously which in turn increases the reactor safety as a whole. The research was performed step by stepin detail from the conventional technique, online calibration using baseline information and online calibration using differential gain adjustment. Online calibration based on differential gain adjustment provides better results than other techniques even tough under extreme gain insertion as well as external disturbances such as supply voltages. (author)

  9. 78 FR 47235 - Airworthiness Directives; General Electric Company Turbofan Engines

    Science.gov (United States)

    2013-08-05

    ... cycle counts of those LLPs to account for the additional low cycle fatigue (LCF) life consumed during... Boeing 747-8 flight tests had consumed more cyclic life than they would have in revenue flight cycles... Company Turbofan Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed...

  10. Improvements to the sodium supply system of a nuclear reactor core

    International Nuclear Information System (INIS)

    Chevallier, Rene; Marchais, Christian.

    1981-01-01

    This invention concerns an improvement to the sodium supply system of a nuclear reactor core and, in particular, concerns the area included between the outlet of the primary circulation pumps and the core proper. A simplified structure and a lightening of all this linking area between the circulation pumps and the distribution tank under the core is achieved and this results in a very significant reduction in the risks of deterioration and in a definite increase in the reliability of the reactor. The invention is therefore an improvement to the sodium supply system of the nuclear reactor core vessel with incorporated exchangers, in which the cool sodium, after passing through the primary exchangers, is collected in a ring compartment from whence it is taken up by the pumps and moved to at least one pipe reaching a distribution tank located under the reactor core [fr

  11. Supply of low enriched (LEU) and highly enriched uranium (HEU) for research reactors

    International Nuclear Information System (INIS)

    Mueller, H.

    1997-01-01

    Enriched uranium for research reactors in the form of LEU /= low enriched uranium at 19.75% U-235) and HEU (= highly enriched uranium at 90 to 93% U-235) was and is - due to its high U-235 enrichment - a political fuel other than enriched uranium for power reactors. The sufficient availability of LEU and HEU is a vital question for research reactors, especially in Europe, in order to perform their peaceful research reactor programs. In the past the USA were in the Western hemisphere sole supplier of LEU and HEU. Today the USA have de facto stopped the supply of LEU and HEU, for HEU mainly due to political reasons. This paper deals, among others, with the present availability of LEU and HEU for European research reactors and touches the following topics: - historical US supplies, - influence of the RERTR-program, - characteristics of LEU and HEU, - military HEU enters the civil market, -what is the supply situation for LEU and HEU today? - outlook for safe supplies of LEU and HEU. (author)

  12. A demand/supply and price outlook for electricity in Ontario

    International Nuclear Information System (INIS)

    Dalton, J.

    2004-01-01

    This paper presents the demand/supply and price outlook for electricity in Ontario. The paper examines the near term outlook, critical demand and supply issues, the projected Ontario demand/supply balances and finally concludes by looking at the challenges for Ontario's new market structure

  13. Ensuring the security of electricity supply in Ontario: is demand-side management the answer?

    International Nuclear Information System (INIS)

    Chuddy, B.

    2004-01-01

    This paper examines the issues relating to ensuring the security of electricity supply in Ontario. In particular, it focuses on demand-side management as a means of achieving these objectives. The solution involves both conservation and supply. It is therefore critical that there be investment in new supply with multiple buyers/sellers. regulatory environment and pricing could encourage conservation

  14. Electric energy demand and supply prospects for California

    Science.gov (United States)

    Jones, H. G. M.

    1978-01-01

    A recent history of electricity forecasting in California is given. Dealing with forecasts and regulatory uncertainty is discussed. Graphs are presented for: (1) Los Angeles Department of Water and Power and Pacific Gas and Electric present and projected reserve margins; (2) California electricity peak demand forecast; and (3) California electricity production.

  15. Electrical and magnetic fields of the power supply

    International Nuclear Information System (INIS)

    2017-01-01

    The availability of electrical energy in all areas of life is guaranteed by a widely ramified power grid. When electricity is transported, magnetic fields are created in addition to the electrical fields. In this brochure one will learn more about the causes and effects of electrical and magnetic fields as well as protection concepts and preventive measures. [de

  16. Technical evaluation report on the monitoring of electric power to the reactor-protection system for the Pilgrim Nuclear Power Station

    International Nuclear Information System (INIS)

    Selan, J.C.

    1982-01-01

    This report documents the technical evaluation of the monitoring of electric power to the reactor protection system (RPS) at the Pilgrim Nuclear Power Station. The evaluation is to determine if the proposed design modification will protect the RPS from abnormal voltage and frequency conditions which could be supplied from the power supplies and will meet certain requirements set forth by the Nuclear Regulatory Commission. The proposed design modifications will protect the RPS from sustained abnormal voltage and frequency conditions from the supplying sources

  17. Scaling of silent electrical discharge reactors for hazardous organics destruction

    International Nuclear Information System (INIS)

    Coogan, J.J.; Rosocha, L.A.; Brower, M.J.; Kang, M.; Schmidt, C.A.

    1993-01-01

    Silent electrical discharges are used to produce highly reactive free radicals that destroy hazardous compounds entrained in gaseous effluents at ambient gas temperatures and pressures. We have carried out destruction experiments at Los Alamos on a range of volatile organic compounds (VOCs), including trichloroethylene (TCE), carbon tetrachloride, perchloroethylene (PCE), and chlorofluorocarbons (CFCs). We have measured a ''nine-factor'', the amount of energy required to reduce the VOC concentration by a factor of ten. For practical reactor power densities, the ''nine-factor'' can be used to predict the destruction an removal efficiency (DRE) in terms of gas flow rate and the number of reactor modules. This report proposes a modular, stackable architecture for scaling up the reactor throughput

  18. 77 FR 56241 - Notice of Withdrawal of Final Design Approval; Westinghouse Electric Company; Advanced Passive 1000

    Science.gov (United States)

    2012-09-12

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0131] Notice of Withdrawal of Final Design Approval; Westinghouse Electric Company; Advanced Passive 1000 By letter dated December 10, 2010, Westinghouse Electric... final design approval (FDA) for the Advanced Passive 1000 (AP1000) design upon the completion of...

  19. Management report 2001 of COPEL - Electrical Company of Parana State, Brazil

    International Nuclear Information System (INIS)

    Anon

    2000-01-01

    The COPEL - Electrical Company of Parana State, Brazil - management report of calendar year of 2000 is presented, covering the following topics: COPEL - standing for much more than energy; extending the benefits of electricity to everyone in Parana state, Brazil; protecting and recovering the environment; philanthropy and volunteer work; education; social integration; support to cultural expression and gratitude

  20. Social balance sheet 2000 of COPEL - Electrical Company of Parana State, Brazil

    International Nuclear Information System (INIS)

    Anon

    2000-01-01

    The COPEL - Electrical Company of Parana State, Brazil social balance report of calendar year of 2000 is presented, covering the following topics: COPEL - standing for much more than energy; extending the benefits of electricity to everyone in Parana state, Brazil; protecting and recovering the environment; philanthropy and volunteer work; education; social integration; support to cultural expression and gratitude

  1. Impacts of Groundwater Constraints on Saudi Arabia's Low-Carbon Electricity Supply Strategy.

    Science.gov (United States)

    Parkinson, Simon C; Djilali, Ned; Krey, Volker; Fricko, Oliver; Johnson, Nils; Khan, Zarrar; Sedraoui, Khaled; Almasoud, Abdulrahman H

    2016-02-16

    Balancing groundwater depletion, socioeconomic development and food security in Saudi Arabia will require policy that promotes expansion of unconventional freshwater supply options, such as wastewater recycling and desalination. As these processes consume more electricity than conventional freshwater supply technologies, Saudi Arabia's electricity system is vulnerable to groundwater conservation policy. This paper examines strategies for adapting to long-term groundwater constraints in Saudi Arabia's freshwater and electricity supply sectors with an integrated modeling framework. The approach combines electricity and freshwater supply planning models across provinces to provide an improved representation of coupled infrastructure systems. The tool is applied to study the interaction between policy aimed at a complete phase-out of nonrenewable groundwater extraction and concurrent policy aimed at achieving deep reductions in electricity sector carbon emissions. We find that transitioning away from nonrenewable groundwater use by the year 2050 could increase electricity demand by more than 40% relative to 2010 conditions, and require investments similar to strategies aimed at transitioning away from fossil fuels in the electricity sector. Higher electricity demands under groundwater constraints reduce flexibility of supply side options in the electricity sector to limit carbon emissions, making it more expensive to fulfill climate sustainability objectives. The results of this analysis underscore the importance of integrated long-term planning approaches for Saudi Arabia's electricity and freshwater supply systems.

  2. Electricity supply: Supporting analysis for the National Energy Strategy

    International Nuclear Information System (INIS)

    1991-01-01

    This report has been prepared by the Energy Information Administration at the request of the Department of Energy's Office of Policy, Planning and Analysis. The results are based on assumptions provided by the Department of Energy's Office of Conservation and Renewable Energy, the Office of Nuclear Energy, the Office of Fossil Energy, and the Office of Policy, Planning and Analysis. This report serves as an auxiliary document to the publication, Improving Technology: Modeling Energy Futures for the National Energy Strategy, prepared by the Energy Information Administration (EIA), to be used as input to the development of a National Energy Strategy. The excursions discussed in this report are not necessarily the policy options which will be selected for inclusion in the National Energy Strategy (NES). This report examines the effects of various supply side options for electric utilities. The three excursions presented are: (1) Effects of the Clean Air Act Amendments on Reducing SO 2 /NO x Emissions which evaluates the impacts of proposed legislation to amend the Clean Air Act (Title V of H.R. 3030 as amended on May 23, 1990); (2) Nuclear Life Extension/New Nuclear Orders which illustrates the impact of new nuclear power plant orders and the life extension of existing nuclear plants; and (3) Nuclear and Accelerated Fossil-Fueled Generating Technologies which portrays accelerated research and development of advanced fossil-fueled generating technologies, making them commercially available earlier, with the inclusion of the nuclear option. The baseline case of this report is an update and an extension of the base case projections in the Energy Information Administration (EIA) publication, the Annual Energy Outlook 1990 (AEO), extending that forecast an additional 20 years to 2030. It represents the baseline case as it was on July 1990. 29 refs., 9 figs., 19 tabs. (JF)

  3. Electricity supply. Older plants' impact on reliability and air quality

    International Nuclear Information System (INIS)

    England-Joseph, Judy A.; Adams, Charles M.; Wood, David G.; Feehan, Daniel J.; Veal, Howard F.; Skeen, John H. III; Koenigs, Melvin J.; Lichtenfeld, David I.; Seretakis, Pauline J.

    1990-09-01

    Life extension of fossil fuel plants is a relatively recent phenomenon; thus, utilities have little experience to demonstrate the longer-term operating reliability of plants with an extended service life. While utility industry officials and government and industry studies express optimism that these plants will continue to operate reliably, the officials and the studies also caution that it is too soon to determine how pursuing life extension will affect the reliability of the nation's electricity supply. According to DOE, the number of fossil fuel generating units' 30 years old or older is expected to increase from about 2,500 in 1989 to roughly 3,700 in 1998, increasing such plants' share of overall generating capacity from 13 percent in 1989 to 27 percent in 1998. EPA estimates that with existing air quality requirements, fossil fuel plant emissions will increase steadily during the coming decade. Proposed acid rain control legislation, which would affect many plants that may have their service life extended, would require utilities to significantly reduce emissions by the year 2000 but would allow utilities flexibility in deciding how and where to achieve the reductions. If such legislation is enacted, utilities generally are expected to find reducing emissions from existing plants more cost-effective than replacing them and to continue extending plants' service life. Officials of DOE and utility organizations expressed concern, however, that EPA could decide, as it did for one plant in 1988, that alterations made in extending the service life of plants exempted from the Clean Air Act would result in increased emissions and thus cause the altered plants to lose their exemption. According to the officials, the additional costs of achieving the Clean Air Act's standards could discourage some life extension projects. However, such decisions by EPA could also reduce the nation's total power plant emissions by eliminating an existing incentive to retain exempt

  4. Suburban Housing Development and Off-Grid Electric Power Supply Assessment for North-Central Nigeria

    Directory of Open Access Journals (Sweden)

    Ibikunle Olalekan Ogundari

    2017-01-01

    Full Text Available Energy infrastructures in North-Central Nigeria are inadequate and grid electricity is unable to meet suburban housing electricity demand. The alternative power-supply options proposed by government for the region require appropriation analysis for selection. Four public housing estates in suburban Abuja are selected for electricity demand analysis under conventional and energy-efficient lighting scenarios; then techno-economic parameters of two off-grid electric power supply systems (PV and Diesel-powered generation to meet these electricity demands are evaluated. An energy techno-economic assessment methodology is used. The study determines the energy-efficient lighting system is appropriate with 40% energy savings relative to the Conventional Lighting Systems. The diesel generator alternative power-supply option has Life Cycle Costs almost 4 times those of the PV option. The study established the PV-energy-efficient lighting system as the most feasible off-grid electric power supply alternative for implementation.

  5. Maintaining a balanced electricity supply favours increased nuclear capacity in Finland

    International Nuclear Information System (INIS)

    Ahti, Toivola

    2001-01-01

    Finland's electricity supply is based on a balanced mix of energy sources to maximize the security of supply and to keep the volatility of electricity price at a minimum. One third of electricity is obtained from domestic sources hydro, wood and peat. Nuclear power provides one quarter and fossil fuels slightly over one fifth. Electricity imports from neighbour countries cover the rest of the consumption. It is important to maintain this balanced structure also when electricity supply is being increased. Domestic renewable sources are not enough to cover the predicted future needs, and increasing imports would risk the security of supply. Increasing the proportion of fossil fuels is not a generally desired option. Therefore, balanced increase of nuclear capacity has to be included among the choices of future electricity generation. (author)

  6. Evaluating the HR function as being a factor of supply chain performance: Case of industrial companies in Morocco

    Directory of Open Access Journals (Sweden)

    Elmortada Asmaa

    2017-01-01

    Full Text Available In an economic environment increasingly complex and competitive, firms are now aware, more than ever, of the importance of controlling the human resources function as a primary factor to the success and performance of their supply chains. Through studying the Moroccan industrial companies, the concern of this article is to highlight the role of human resource function in the supply chain performance, in the light of the company culture and under the effect of a HRM practices influenced by the competitive environment, and the resulting mutations.

  7. Nuclear refinery - advanced energy complex for electricity generation, clean fuel production, and heat supply

    International Nuclear Information System (INIS)

    McDonald, C.F.

    1992-01-01

    In planning for increased U.S. energy users' demand after the year 2000 there are essentially four salient vectors: (1) reduced reliance on imported crude oil; (2) provide a secure supply with stable economics; (3) supply system must be in concert with improved environment goals; and (4) maximum use to be made of indigenous resources. For the last decade of this century the aforementioned will likely be met by increasing utilization of natural gas. Early in the next century, however, in the U.S. and the newly industrializing nations, the ever increasing energy demand will only be met by the combined use of uranium and coal. The proposed nuclear refinery concept is an advanced energy complex that has at its focal point an advanced modular helium reactor (MHR). This nuclear facility, together with a coal feedstock, could contribute towards meeting the needs of the four major energy sectors in the U.S., namely electricity, transportation, industrial heating and chemical feedstock, and space and water heating. Such a nuclear/coal synergistic system would be in concert with improved air quality goals. This paper discusses the major features and multifaceted operation of a nuclear refinery concept, and identifies the enabling technologies needed for such an energy complex to become a reality early in the 21st century. (Author)

  8. Impacts of market liberalization on the electricity supply sector: a comparison of the experience in Austria and Germany

    International Nuclear Information System (INIS)

    Madlener, R.; Jochem, E.

    2001-01-01

    The impacts of market liberalization on the electricity supply sector depend on many different factors and boundary conditions. Comparing these impacts in Austria and Germany, two countries which both participate in the European internal market and have a central geographical location in Western Europe, and which both have borders and important trade relationships with Central and Eastern European countries, provides some important insights with regard to the following aspects: (a) the differences in the primary energy supply mix for electricity generation; (b) the substantial excess capacity, not only in the two countries analyzed but also in the EU as a whole, and its uneven reduction due to different market opening speeds within the Community and differences in the plant stock composition; (c) the utility company structure, including ownership and traditional energy supply and customer relations; (d) the changing situation faced by co-generation and small power producers; and (e) the relevant regulation of third-party access to the grid, electricity transmission, and prices for small/captive consumers. Last but not least, the paper also covers the influence of the expected increase in the volumes of electricity traded in the two countries, also with their Central and Eastern European neighbors (where the level of the playing field may not yet be equalized in the near future), and the concerns that this may lead to conflicts in the achievement of the energy policies, environmental policies, and climate change policies aimed for at the national and European level. (author)

  9. Measuring efficiency and productivity change (PTF) in the Peruvian electricity distribution companies after reforms

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Reyes, Raul [Organismo Supervisor de la Inversion en Energia y Mineria, Osinergmin (Peru); Tovar, Beatriz [Infrastructure and Transport Research Group (EIT), Department of Applied Economics, University of Palmas de Gran Canaria (Spain)

    2009-06-15

    This paper analyzes the evolution of productivity of the electricity distribution companies in Peru, to assess whether reforms have improved the efficiency in this sector. The paper also identifies potential sources of productivity changes, based on market restructuring the electricity sector and changes in property. To do this, we rely on a set of data for 14 distribution companies, for the period 1996-2006. Our analysis suggests that improvements in the efficiency and productivity of electricity distribution in Peru have occurred, and that there is a relationship between the restructuring of distribution sector and the enhancement of productivity. (author)

  10. Measuring efficiency and productivity change (PTF) in the Peruvian electricity distribution companies after reforms

    International Nuclear Information System (INIS)

    Perez-Reyes, Raul; Tovar, Beatriz

    2009-01-01

    This paper analyzes the evolution of productivity of the electricity distribution companies in Peru, to assess whether reforms have improved the efficiency in this sector. The paper also identifies potential sources of productivity changes, based on market restructuring the electricity sector and changes in property. To do this, we rely on a set of data for 14 distribution companies, for the period 1996-2006. Our analysis suggests that improvements in the efficiency and productivity of electricity distribution in Peru have occurred, and that there is a relationship between the restructuring of distribution sector and the enhancement of productivity. (author)

  11. Comparative status and development trends of central electricity supply technologies in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Kolb, G.

    1989-01-01

    This paper describes the present situation in the public electricity sector of the FRG with its legal and political constraints, to identify the development trends of the supply technologies for central electricity in regard to their application potential during the forthcoming 10 to 20 years. Summarizing expectations and conclusions are drawn on the foreseeable contribution of the electricity supply sector to the aspired CO 2 -reductions in the FRG

  12. Impact of continuous and intermittent supply of electric field on the function and microbial community of wastewater treatment electro-bioreactors

    International Nuclear Information System (INIS)

    Zeyoudi, Mozah; Altenaiji, Eiman; Ozer, Lutfiye Y.; Ahmed, Iftikhar; Yousef, Ahmed F.; Hasan, Shadi W.

    2015-01-01

    The application of electro-technologies to existing biological treatment methods in the United Arab Emirates (UAE) requires further understanding of how microorganisms respond to said electro-technologies. This is necessary in order to optimize and enhance the treated effluent water's quality. Therefore, the primary objective of this research study was to evaluate the microbial communities present in a bio-electrochemical reactor under different operating conditions where variables such as current density and exposure time to electric field were modified in order to achieve system process stability. This study was divided into three Phases. In Phase 1, a laboratory scale study was conducted at different current densities ranging between 5 and 20 A m −2 continuously supplied with no addition of substrate. In Phase 2, a laboratory scale study was conducted at continuous supply of electric field at different current densities ranging between 5 and 20 A m −2 (Stage 1), and at intermittent supply of electric field at constant current density of 15 A m −2 (Stage 2). In each Phase, biokinetics (bacterial counts, growth rates and doubling times), and substrate utilization rate (organic removal) were assessed. Overall, results showed that continuous and intermittent supply of electric field significantly increased observed bacterial counts, growth rates, and soluble chemical oxygen demand (sCOD) removal at lower current densities. High resolution melting analysis (HRM) from Phase 3 indicated that intermittent supply of electric field caused a shift in the microbial population structure in a wastewater bioreactor, while no shift in microbial community population structure was observed in reactors supplied with constant current densities. Taken together, the results presented here indicate that introducing low intermittent or constant electrical current densities to existing biological treatment methods in the UAE has the potential to lead to more efficient and

  13. Scottish Nuclear, the company

    International Nuclear Information System (INIS)

    Yeomans, R.M.

    1991-01-01

    A former chief executive of Scottish Nuclear, formed when United Kingdom electricity generation was privatized, describes the financial viability of the company and considers the future of nuclear power. Scottish Nuclear owns and operates the Advanced Gas Cooled (AGR) and Magnox reactors at Hunterston and the AGR reactor at Torness and is a separate company from those dealing with hydro-electric and non-nuclear generation of electricity. Costs of running the reactors is identified as a proportion of the whole for certain key issues such as station costs, depreciation, decommissioning and insurance. While nuclear power generation using outmoded Magnox reactors is costly, the ecological cost of global warming is seen as more of a problem. Future policy for nuclear power in Scotland must include new plant, probably pressurized water reactors and a clear policy of safety enhancement. (UK)

  14. Creating a business environment in inventory management - The Philadelphia Electric Company experiences

    International Nuclear Information System (INIS)

    Franks, A.J.; Birch, H.

    1992-01-01

    Philadelphia Electric Company's (PECo's) Nuclear Engineering and Services Department was asked to develop a (non-fuel) inventory management philosophy that will optimize inventory dollars at Peach Bottom atomic power station and Limerick generating station. The ultimate goal of the project is to maximize the potential for the correct parts being available at the lowest possible level of investment. There are many factors that make the management of maintenance, repair, and operating (MRO) supply inventories more complicated than managing finished goods, work-in-progress, or raw materials. Determining correct inventory levels for nuclear power plants is complicated by the irregular demand for spare parts and the cyclic nature of demand caused by refueling outages. Based on the information collected, it was determined that PECo's nuclear group needed to develop policies and strategies to address the following issues: (1) inventory classification based on part criticality, usage, and demand forecast; (2) item level ordering policies based on classification system; (3) inventory performance management; and (4) management of obsolete/surplus parts. Currently, policies are being developed to manage surplus and obsolete materials. Opportunities are being explored regarding the potential capitalization of critical components and parts. The policies established for classification, ordering policies, and performance management are being translated into work processes via common procedures and guidelines

  15. Development of a global electricity supply model and investigation of electricity supply by renewable energies with a focus on energy storage requirements for Europe

    Energy Technology Data Exchange (ETDEWEB)

    Troendle, Tobias Wolfgang

    2014-12-12

    Electricity supply at present requires about 38% of the global primary energy demand and it is likely to rise further in the coming decades. Facing major problems, such as limited resources of fuels and an ongoing anthropogenic climate change, a sustainable electricity supply based on renewable energies is absolutely vital. Wind and solar power will play an extensive role in future supplies but require energy storage capacities to meet electricity demand. To investigate the relationship of power plant mix and required energy storage capacity, a computer model based on global weather data has been developed to enable the simulation of electricity supply scenarios by up to ten different power plant types for various regions. The focus of the investigation has been on the energy storage requirements of an electricity supply for Europe by wind and solar power. The minimum required energy storage capacity for a totally weather dependent electricity supply occurs at a ratio of 30% wind and 70% photovoltaic (PV) power plant capacity installed. Thus, the required energy storage capacity rises from a transition of to-day's electricity supply to the afore-mentioned 100% renewable wind and PV scenario exponentially to about 150 TWh (3.8% of the annual electricity demand). The installation of additional excess wind and PV power plant capacity was seen to be an efficient way to reduce the required energy storage. Already 10% excess capacity lead to a reduction by 50% of the required storage capacity. To use different storage technologies in an optimised way in terms of storage capacity and efficiency, the storage tasks can be separated into a daily and a seasonal usage. While the seasonal storage capacity has to be about two orders of magnitude larger than the required capacity of the storage for the daily cycle, the sum of stored energy during one year is almost equal for the long and short time storage. In summary, an electricity supply by wind and PV power was shown to

  16. Development of a global electricity supply model and investigation of electricity supply by renewable energies with a focus on energy storage requirements for Europe

    International Nuclear Information System (INIS)

    Troendle, Tobias Wolfgang

    2014-01-01

    Electricity supply at present requires about 38% of the global primary energy demand and it is likely to rise further in the coming decades. Facing major problems, such as limited resources of fuels and an ongoing anthropogenic climate change, a sustainable electricity supply based on renewable energies is absolutely vital. Wind and solar power will play an extensive role in future supplies but require energy storage capacities to meet electricity demand. To investigate the relationship of power plant mix and required energy storage capacity, a computer model based on global weather data has been developed to enable the simulation of electricity supply scenarios by up to ten different power plant types for various regions. The focus of the investigation has been on the energy storage requirements of an electricity supply for Europe by wind and solar power. The minimum required energy storage capacity for a totally weather dependent electricity supply occurs at a ratio of 30% wind and 70% photovoltaic (PV) power plant capacity installed. Thus, the required energy storage capacity rises from a transition of to-day's electricity supply to the afore-mentioned 100% renewable wind and PV scenario exponentially to about 150 TWh (3.8% of the annual electricity demand). The installation of additional excess wind and PV power plant capacity was seen to be an efficient way to reduce the required energy storage. Already 10% excess capacity lead to a reduction by 50% of the required storage capacity. To use different storage technologies in an optimised way in terms of storage capacity and efficiency, the storage tasks can be separated into a daily and a seasonal usage. While the seasonal storage capacity has to be about two orders of magnitude larger than the required capacity of the storage for the daily cycle, the sum of stored energy during one year is almost equal for the long and short time storage. In summary, an electricity supply by wind and PV power was shown to

  17. Ecology, Economy and security of supply of the Dutch Electricity Supply System. A scenario based future analysis

    International Nuclear Information System (INIS)

    Roedel, J.G.

    2008-01-01

    The Dutch electricity sector has been transformed into a liberalized international energy market. Market players are free to choose from various electricity generation options when replacing or expanding production capacity. However, choices that are made now will influence emissions (ecology), integral costs (economy) and availability (security of supply) for the next 25 - 40 years. This thesis shows if and how, based on the current electricity supply system, an optimal balance of ecology, economy and security of supply can be achieved. First, the current electricity supply system is described to create a frame of reference. Then, future technological developments are described for electricity production options. Four potential scenarios are constructed featuring various uncertainties: the globalising versus the local economy; priority versus subordination for the environment; and the security/insecurity of the fuel supply. These four scenarios are worked out with a specially developed techno-economic simulation model; the results are analysed in terms of ecology, economy and security of supply. The findings indicate that it is impossible to arrive at an optimal balance for the defined scenarios. Scenarios with a low environmental impact lead to high integral costs and vice versa. However, by applying a smart combination of various modern generation technologies, CO2 capture and storage, the deployment of biomass and the re-use of residual heat it is possible to reach an optimal balance whereby the additional integral costs can be kept under control compared with the lowest-cost scenarios. To achieve this, clear growth and incentive guidelines need to be established for the various production options. This thesis will form a good starting point for that exercise

  18. Forecasted electric power demands for the Baltimore Gas and Electric Company. Volume 1 and Volume 2. Documentation manual

    International Nuclear Information System (INIS)

    Estomin, S.L.; Beach, J.E.; Goldsmith, J.V.

    1991-05-01

    The two-volume report presents the results of an econometric forecast of peak load and electric power demand for the Baltimore Gas and Electric Company (BG ampersand E) through the year 2009. Separate energy sales models were estimated for residential sales in Baltimore City, residential sales in the BG ampersand E service area excluding Baltimore City, commercial sales, industrial sales, streetlighting sales, and Company use plus losses. Econometric equations were also estimated for electric space heating and air conditioning saturation in Baltimore City and in the remainder of the BG ampersand E service territory. In addition to the energy sales models and the electric space conditioning saturation models, econometric models of summer and winter peak demand on the BG ampersand E system were estimated

  19. Electric power supply in an offshore oil production platform | Ibe ...

    African Journals Online (AJOL)

    powered UPS system with a rotary engine UPS which can provide long-term power supply back-up as well as the benefits of rotating machines. KEY WORDS: Offshore, Platform, Power Supply, Gas turbine, Rotary Diesel UPS. [Global Jnl ...

  20. Reactor type choice and characteristics for a small nuclear heat and electricity co-generation plant

    International Nuclear Information System (INIS)

    Liu Kukui; Li Manchang; Tang Chuanbao

    1997-01-01

    In China heat supply consumes more than 70 percent of the primary energy resource, which makes for heavy traffic and transportation and produces a lot of polluting materials such as NO x , SO x and CO 2 because of use of the fossil fuel. The utilization of nuclear power into the heat and electricity co-generation plant contributes to the global environmental protection. The basic concept of the nuclear system is an integral type reactor with three circuits. The primary circuit equipment is enclosed in and linked up directly with reactor vessel. The third circuit produces steam for heat and electricity supply. This paper presents basic requirements, reactor type choice, design characteristics, economy for a nuclear co-generation plant and its future application. The choice of the main parameters and the main technological process is the key problem of the nuclear plant design. To make this paper clearer, take for example a double-reactor plant of 450 x 2MW thermal power. There are two sorts of main technological processes. One is a water-water-steam process. Another is water-steam-steam process. Compared the two sorts, the design which adopted the water-water-steam technological process has much more advantage. The system is simplified, the operation reliability is increased, the primary pressure reduces a lot, the temperature difference between the secondary and the third circuits becomes larger, so the size and capacity of the main components will be smaller, the scale and the cost of the building will be cut down. In this design, the secondary circuit pressure is the highest among that of the three circuits. So the primary circuit radioactivity can not leak into the third circuit in case of accidents. (author)

  1. Problems in producing nuclear reactor for medical isotopes and the Global Crisis of molybdenum supply

    International Nuclear Information System (INIS)

    Zubiarrain, A.

    2011-01-01

    Nuclear medicine uses drugs that incorporate a radioactive isotope radiopharmaceuticals. Every year are performed, worldwide, 35 million nuclear medicine procedures, of which 80% are done with radiopharmaceuticals containing the isotope, molybdenum-99, produced in nuclear reactors. In recent years, there have been several supply crisis of molybdenum-99, which have hampered diagnostic procedure with technitium-99m. (Author)

  2. The Y-12 National Security Complex Foreign Research Reactor Uranium Supply Production

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, T. [Nuclear Technology and Nonproliferation Programs, B and W Y-12, L.L.C., Y-12 National Security Complex, Oak Ridge, Tennessee (United States); Keller, A.P. [Disposition and Supply Programs, B and W Y-12, L.L.C., Y-12 National Security Complex, Oak Ridge, Tennessee (United States)

    2011-07-01

    The Foreign Research Reactor (FRR) Uranium Supply Program at the Y-12 National Security Complex supports the nonproliferation objectives of the National Nuclear Security Administration (NNSA) HEU Disposition, the Reduced Enrichment Research and Test Reactors (RERTR), and the United States (U.S.) FRR Spent Nuclear Fuel (SNF) Acceptance Programs. The FRR Supply Program supports the important U.S. government nuclear nonproliferation commitment to serve as a reliable and cost-effective uranium supplier for those foreign research reactors that are converting or have converted to Low-Enriched Uranium (LEU) fuel under the RERTR Program. The NNSA Y-12 Site Office maintains the prime contracts with foreign government agencies for the supply of LEU for their research reactors. The LEU is produced by down blending Highly Enriched Uranium (HEU) that has been declared surplus to the U.S. national defense needs. The down blending and sale of the LEU supports the Surplus HEU Disposition Program Record of Decision to make the HEU non-weapons usable and to recover the economic value of the uranium to the extent feasible. In addition to uranium metal feedstock for fuel fabrication, Y-12 can produce LEU in different forms to support new fuel development or target fabrication for medical isotope production. With production improvements and efficient delivery preparations, Y-12 continues to successfully support the global research reactor community. (author)

  3. The fast breeder reactor and the electricity provision system

    International Nuclear Information System (INIS)

    1975-01-01

    Due to inflexible planning, the electricity provision system is bound to generate demands for big centralized power plants, that is, nuclear power plants. A lack of feed-back from producer to consumer results in a technical distribution net-work that cannot react to big changes in supply and demand. This makes it particularly difficult to include alternative energy sources with fluctuating energy production

  4. 9th international conference on high-temperature reactors - coal and nuclear energy for electricity and gas generation

    International Nuclear Information System (INIS)

    Kelber, G.

    1987-01-01

    The site of the high-temperatur reactor in the Ruhr region neighbouring on a coal-fired power plant is not accidental. The potential of the high-temperature reactor as a central plant element for the supply of heat for heating purposes and process heat covers also the possibility of coal gasification and liquefaction. Therefore the high-temperature reactor is, in the long term, a ray of hope for the coal region, able to compensate for the production-related competitive disadvantages of local coal. It can contribute to guaranteeing in the long term the task of German hard coal as an essential pillar of our energy supply. The VGB as a technical association of thermal power plant operators is particularly committed to the integration of coal and nuclear energy. Within the bounds of its possibilities, it will contribute to promoting the safe and environmentally beneficial generation of electricity from the two primary energy sources. (orig./DG) [de

  5. Proposal for a new Electrical Supply of the Computer Centre for LHC

    CERN Document Server

    Funken, A

    2001-01-01

    To handle the future LHC experiment needs, the Computer Centre will go through a complete change of data processing methods. A total of five Computing farms will be built covering an area of 2,000 m2. The electrical power required for the new Computing farms will increase by five fold to 2 MW. This will have major impact on the technical infrastructures. Focusing on electrical issues, this paper initially explains the principle of the present electrical supply and the major drawbacks. Taking advantage of the opportunity offered by these big changes and conclusions drawn from the recent ST/EL reports, the strategy of electrical supply of building 513 is reviewed, in particular the Diesel backup supply. On this basis and benchmarking with similar Computer Centres, a proposal for a new electrical supply is presented, the objectives being to meet the increase in demand, reliability and safe operation of the Computer Centre.

  6. Foreign research reactor uranium supply program: The Y-12 national security complex process

    International Nuclear Information System (INIS)

    Nelson, T.; Eddy, B.G.

    2010-01-01

    The Foreign Research Reactor (FRR) Uranium Supply Program at the Y-12 National Security Complex supports the nonproliferation objectives of the HEU Disposition Program, the Reduced Enrichment Research and Test Reactors (RERTR) Program, and the United States FRR Spent Nuclear Fuel (SNF) Acceptance Program. The Y-12 National Nuclear Security Administration (NNSA) Y-12 Site Office maintains the prime contracts with foreign governments for the supply of Low-Enriched Uranium (LEU) for their research reactors. The LEU is produced by down blending Highly Enriched Uranium (HEU) that has been declared surplus to the U.S. national defense needs. The down blending and sale of the LEU supports the Surplus HEU Disposition Program Record of Decision to make the HEU non-weapons usable and to recover the economic value of the uranium to the extent feasible. This program supports the important U.S. government and nuclear nonproliferation commitment to serve as a reliable and cost-effective uranium supplier for those foreign research reactors that are converting or have converted to LEU fuel under the guidance of the NNSA RERTR Program. In conjunction with the FRR SNF Acceptance Program which supports the global nonproliferation efforts to disposition U.S.-origin HEU, the Y-12 FRR Uranium Supply Program can provide the LEU for the replacement fuel fabrication. In addition to feedstock for fuel fabrication, Y-12 supplies LEU for target fabrication for medical isotope production. The Y-12 process uses supply forecasting tools, production improvements and efficient delivery preparations to successfully support the global research reactor community

  7. Analyzing the environmental impact of transportation in reengineered supply chains: a case study from a leather upholstery company

    NARCIS (Netherlands)

    Yazan, Devrim Murat; Yazan, Devrim; Petruzzelli, Antonio Messeni; Albino, Vito

    2011-01-01

    This paper examines the impact of process disaggregation and specialization on the environmental performance of the supply chain of a leather upholstery company. An enterprise input–output model that relates geographical information with production processes and transportation routes is developed.

  8. The direct conversion of heat into electricity in reactors

    International Nuclear Information System (INIS)

    Devin, B.; Bliaux, J.; Lesueur, R.

    1964-01-01

    The direct conversion of heat into electricity by thermionic emission in an atomic reactor has been studied with the triple aim of its utilisation: as an energy source for a space device, at the head of a conventional conversion system in power installations, or finally in association with the thermoelectric conversion in very low power installations. The laboratory experiments were mainly orientated towards the electron extraction of metals and compounds and their behaviour at high temperatures. Converters furnishing up to 50 amps at 0. 4 volts with an efficiency close to 10 p. 100 have been constructed in the laboratory; the emitters were heated by electron bombardment and were composed of tungsten covered with an uranium carbide deposit or molybdenum covered with cesium. The main aspects of the coupling between the converter and the reactor have been covered from the point of view of electronics: the influence of the mismatching of the load on the temperature of the emitter and the influence of thermal flux density on the temperature of the emitter and the stability of the converter. Converters using uranium carbide as the electron emitter have been tested in reactors. Tests have been made under dynamic conditions in order to determine the dynamic characteristics. The load matching curves have been constructed and the overall performances of several cells coupled in such a way as to form a reactor rod have been deduced. This information is fundamental to the design of a control system for a thermionic conversion reactor. The problems associated with the reliability of thermionic converters connected in series in the same reactor rod have been examined theoretically. Finally, the absorption isotherms have been drawn at the ambient temperatures for krypton and xenon on activated carbon with the aim of investigating the escape of fission products in a converter. (author) [fr

  9. Competency-orientated brand cooperations of power supply companies in the B2B sector; Kompetenzorientierte Markenkooperationen von Energieversorgungsunternehmen im B2B-Kundenbereich

    Energy Technology Data Exchange (ETDEWEB)

    Peuser, M.M.

    2008-07-01

    On the basis of an extensive empirical study with B2B electricity users, the author of the book under consideration examines brand co-operations of power supply companies with companies not working in the area of energy production. Based on the view of various co-operation alternatives, impact relations and success-determining factors of influence in the area of B2B customers are identified. The term of the authority of an energy brand is discussed. Beside this, profiles of concrete brands of current power supply companies from the view of B2B customers are pointed out, and recommendations for the organization of brand co-operation and the structure of mark authority in practice are shown. This contribution is written for lecturers and students of the management economics with the emphasis of marketing and management as well as high-level personnel in the energy industry, who wants to develop strong mark authority by brand co-operation.

  10. The German electricity market. Does the present market design provide security of supply?

    International Nuclear Information System (INIS)

    Janssen, Matthias; Peichert, Patrick; Perner, Jens; Riechmann, Christoph; Niedrig, Thomas

    2014-01-01

    A heated discussion is being waged in Germany and large parts of Europe over the introduction of what are referred to as capacity mechanisms, whose purpose is to provide security of supply in the electricity sector. In this context two consulting firms have undertaken a both qualitative and quantitative study of the fitness of the present market design, which is based on the ''Energy-Only Market'' (EOM), to provide security of supply in the German electricity market. The authors come to the conclusion that, if suitably framed, the EOM can continue to provide a secure electricity supply in accordance with consumer preferences and at the lowest possible cost.

  11. Nuclear reactor power for an electrically powered orbital transfer vehicle

    Science.gov (United States)

    Jaffe, L.; Beatty, R.; Bhandari, P.; Chow, E.; Deininger, W.; Ewell, R.; Fujita, T.; Grossman, M.; Kia, T.; Nesmith, B.

    1987-01-01

    To help determine the systems requirements for a 300-kWe space nuclear reactor power system, a mission and spacecraft have been examined which utilize electric propulsion and this nuclear reactor power for multiple transfers of cargo between low earth orbit (LEO) and geosynchronous earth orbit (GEO). A propulsion system employing ion thrusters and xenon propellant was selected. Propellant and thrusters are replaced after each sortie to GEO. The mass of the Orbital Transfer Vehicle (OTV), empty and dry, is 11,000 kg; nominal propellant load is 5000 kg. The OTV operates between a circular orbit at 925 km altitude, 28.5 deg inclination, and GEO. Cargo is brought to the OTV by Shuttle and an Orbital Maneuvering Vehicle (OMV); the OTV then takes it to GEO. The OTV can also bring cargo back from GEO, for transfer by OMV to the Shuttle. OTV propellant is resupplied and the ion thrusters are replaced by the OMV before each trip to GEO. At the end of mission life, the OTV's electric propulsion is used to place it in a heliocentric orbit so that the reactor will not return to earth. The nominal cargo capability to GEO is 6000 kg with a transit time of 120 days; 1350 kg can be transferred in 90 days, and 14,300 kg in 240 days. These capabilities can be considerably increased by using separate Shuttle launches to bring up propellant and cargo, or by changing to mercury propellant.

  12. Nuclear reactor power for an electrically powered orbital transfer vehicle

    International Nuclear Information System (INIS)

    Jaffe, L.; Beatty, R.; Bhandari, P.

    1987-01-01

    To help determine the systems requirements for a 300-kWe space nuclear reactor power system, a mission and spacecraft have been examined which utilize electric propulsion and this nuclear reactor power for multiple transfers of cargo between low Earth orbit (LEO) and geosynchronous Earth orbit (GEO). A propulsion system employing ion thrusters and xenon propellant was selected. Propellant and thrusters are replaced after each sortie to GEO. The mass of the Orbital Transfer Vehicle (OTV), empty and dry, is 11,000 kg; nominal propellant load is 5000 kg. The OTV operates between a circular orbit at 925 km altitude, 28.5 deg inclination, and GEO. Cargo is brought to the OTV by Shuttle and an Orbital Maneuvering Vehicle (OMV); the OTV then takes it to GEO. The OTV can also bring cargo back from GEO, for transfer by OMV to the Shuttle. OTV propellant is resupplied and the ion thrusters are replaced by the OMV before each trip to GEO. At the end of mission life, the OTV's electric propulsion is used to place it in a heliocentric orbit so that the reactor will not return to Earth. The nominal cargo capability to GEO is 6000 kg with a transit time of 120 days; 1350 kg can be transferred in 90 days, and 14,300 kg in 240 days. These capabilities can be considerably increased by using separate Shuttle launches to bring up propellant and cargo, or by changing to mercury propellant

  13. Service to the Electric Utility Industry by the Ford Nuclear Reactor, University of Michigan

    International Nuclear Information System (INIS)

    Burn, R.R.; Simpson, P.A.; Cook, G.M.

    1993-01-01

    Since 1977, the staff of the University of Michigan's Ford Nuclear Reactor has been providing irradiation, testing, analytical, and training services to electric utilities and to suppliers of the nuclear electric utility industry. This paper discusses the reactor's irradiation facilities; reactor programs and utilization; materials testing programs; neutron activation analysis activities; and training programs conducted

  14. Location and allocation decision for supply chain network of Cajeput oil (Case in XYZ company)

    Science.gov (United States)

    Mahardika, F. A.; Hisjam, M.; Widodo, B.; Kurniawan, B.

    2017-11-01

    Cajeput oil is a very promising business. And now, the fulfillment of Cajeput oil in Indonesia is still lacking. It's because the rate of production Cajeput leaves in Indonesia is still low. In Indonesia, XYZ company manages forests in 7 regions. XYZ currently are developing Cajeput oil business. XYZ is currently doing business productivity improvement of Cajeput by planting Cajeput trees in Location 3, Sragen. Besides the Cajeput trees planting program, XYZ plan to do the construction distillery Cajeput leaves. The purpose of the research in this paper is to minimize the total cost of the supply chain network of Cajeput oil in XYZ and to determine whether the construction of a Cajeput distillery should be done or not. This paper uses mixed integer linear programming to make matemathical models. To minimize the total cost, used IBM® ILOG®CPLEX software. From IBM® ILOG®CPLEX software. From the calculation ILOG®CPLEX IBM® software can be seen that the minimum total cost would be obtained if XYZ opened a new distillery with a capacity of 25000kg and a new factory with a capacity of 10000kg. Besides all the truck owned can be used entirely at optimal capacity. And the total cost from IBM® ILOG®CPLEX is IDR 113,406,250.

  15. Arsenic in drinking water: a worldwide water quality concern for water supply companies

    Directory of Open Access Journals (Sweden)

    J. C. van Dijk

    2009-06-01

    Full Text Available For more than a decade it has been known that shallow tube wells in Bangladesh are frequently contaminated with arsenic concentrations at a level that is harmful to human health. By now it is clear that a disaster of an unheard magnitude is going on: the World Health Organization has estimated that long-term exposure to arsenic in groundwater, at concentrations over 500 μg L−1, causes death in 1 in 10 adults. Other studies show that problems with arsenic in groundwater/drinking water occur in many more countries worldwide, such as in the USA and China. In Europe the focus on arsenic problems is currently confined to countries with high arsenic levels in their groundwater, such as Serbia, Hungary and Italy. In most other European countries, the naturally occurring arsenic concentrations are mostly lower than the European drinking water standard of 10 μg L−1. However, from the literature review presented in this paper, it is concluded that at this level health risks cannot be excluded. As consumers in European countries expect the drinking water to be of impeccable quality, it is recommended that water supply companies optimize arsenic removal to a level of <1 μg L−1, which is technically feasible.

  16. Delivering a secure electricity supply on a low carbon pathway

    International Nuclear Information System (INIS)

    Boston, Andy

    2013-01-01

    The energy system can only be considered sustainable in the long term if it is low carbon, affordable and secure. These three create a complex trilemma for all stakeholders in the energy business who have to strike a careful balance without neglecting any one aspect. This discussion paper examines the issues surrounding security of supply of the power system which has received less attention than the other aspects. It looks at how threats and mitigation measures can be classified in terms of where they act on the supply chain and the timescale over which they act. Only by considering the full range of timescales from seconds to decades can the full picture emerge of the effects of new technologies on security of supply. An examination of blackouts over the past 40 years sheds light on the causes of failure to supply and the most vulnerable aspects of the supply chain. - Highlights: ► Energy systems are only sustainable if they are low carbon, affordable and secure. ► Threats to security can be classified by timescale and position in the supply chain. ► The impact of new technologies on security must be considered across all timescales. ► Recent blackouts show the network is most vulnerable and weather the leading cause

  17. Dynamics of global supply chain and electric power networks: Models, pricing analysis, and computations

    Science.gov (United States)

    Matsypura, Dmytro

    In this dissertation, I develop a new theoretical framework for the modeling, pricing analysis, and computation of solutions to electric power supply chains with power generators, suppliers, transmission service providers, and the inclusion of consumer demands. In particular, I advocate the application of finite-dimensional variational inequality theory, projected dynamical systems theory, game theory, network theory, and other tools that have been recently proposed for the modeling and analysis of supply chain networks (cf. Nagurney (2006)) to electric power markets. This dissertation contributes to the extant literature on the modeling, analysis, and solution of supply chain networks, including global supply chains, in general, and electric power supply chains, in particular, in the following ways. It develops a theoretical framework for modeling, pricing analysis, and computation of electric power flows/transactions in electric power systems using the rationale for supply chain analysis. The models developed include both static and dynamic ones. The dissertation also adds a new dimension to the methodology of the theory of projected dynamical systems by proving that, irrespective of the speeds of adjustment, the equilibrium of the system remains the same. Finally, I include alternative fuel suppliers, along with their behavior into the supply chain modeling and analysis framework. This dissertation has strong practical implications. In an era in which technology and globalization, coupled with increasing risk and uncertainty, complicate electricity demand and supply within and between nations, the successful management of electric power systems and pricing become increasingly pressing topics with relevance not only for economic prosperity but also national security. This dissertation addresses such related topics by providing models, pricing tools, and algorithms for decentralized electric power supply chains. This dissertation is based heavily on the following

  18. Business model innovation in electricity supply markets: The role of complex value in the United Kingdom

    International Nuclear Information System (INIS)

    Hall, Stephen; Roelich, Katy

    2016-01-01

    This research investigates the new opportunities that business model innovations are creating in electricity supply markets at the sub-national scale. These local supply business models can offer significant benefits to the electricity system, but also generate economic, social, and environmental values that are not well accounted for in current policy or regulation. This paper uses the UK electricity supply market to investigate new business models which rely on more complex value propositions than the incumbent utility model. Nine archetypal local supply business models are identified and their value propositions, value capture methods, and barriers to market entry are analysed. This analysis defines 'complex value' as a key concept in understanding business model innovation in the energy sector. The process of complex value identification poses a challenge to energy researchers, commercial firms and policymakers in liberalised markets; to investigate the opportunities for system efficiency and diverse outcomes that new supplier business models can offer to the electricity system. - Highlights: •Business models of energy supply markets shape energy transitions. •The British system misses four opportunities of local electricity supply. •Nine new business model archetypes of local supply are analysed. •New electricity business models have complex value propositions. •A process for policy response to business model innovation is presented.

  19. Possible Future Role of Small and Medium Sized Reactors (SMRs) in Countries with Small and Medium Electricity Grids

    International Nuclear Information System (INIS)

    Alujevic, L.

    2016-01-01

    Small and Medium Sized Reactors (SMRs) could have enormous potential as options for enhancing the energy supply security, as well as providing a lower capital investment compared to conventional Nuclear Power Plants (NPPs). The trend in SMR development has been towards design certification of small modular reactors, defined as advanced reactors that produce electric power up to 300 MW(e), designed to be built in factories and shipped to utilities for installation as demand arises. The factory-built small modular reactors aim to reduce lengthy construction times while simultaneously increasing quality, thereby minimizing the costs associated with the current time for construction that spans 5 to 8 years. SMR designs include water-cooled reactors, high temperature gas cooled reactors, as well as liquid metal cooled reactors with fast neutron spectrum. Also, many are designed to be emplaced below ground level, giving a high resistance to terrorist threats. The projected timelines of readiness for deployment of SMRs generally range from the present to 2025 - 2030. Currently there are more than 45 SMR designs under development for different application issues. This paper will try to elaborate the benefits and drawbacks of SMRs, as well as describe a couple of designs. Furthermore, some timelines and cost estimates will be provided, depending on the data currently available. Taking all that into account, the conclusion will try to ascertain the suitability of SMRs for Countries with Small and Medium Electricity Grids, namely Croatia. (author).

  20. 77 FR 7613 - Dow Chemical Company; Dow Chemical TRIGA Research Reactor; Facility Operating License No. R-108

    Science.gov (United States)

    2012-02-13

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-264; NRC-2012-0026] Dow Chemical Company; Dow Chemical TRIGA Research Reactor; Facility Operating License No. R-108 AGENCY: Nuclear Regulatory Commission... Facility Operating License No. R-108 (``Application''), which currently authorizes the Dow Chemical Company...

  1. Clean coal technology project to Polk Power Station, Tampa Electric Company, Florida, Volume 1: Report

    International Nuclear Information System (INIS)

    1994-06-01

    Tampa Electric Company proposes to construct and operate a 1,150-MW power station in southwestern Polk County, Florida. The proposed Polk Power Station would require an EPA NPDES permit for a new source and would include a 260-MW IGCC unit as a DOE Clean Coal Technology demonstration project. This EIS document assesses the proposed project and alternatives with respect to environmental impacts. Mitigative measures are also evaluated for the preferred alternative. Included in this Volume I are the following: alternatives including Tampa Electric Companies proposed project (preferred alternative with DOE financial assistance); affected environment; environmental consequences of the alternatives

  2. Advanced simulation of windmills in electric power supply

    DEFF Research Database (Denmark)

    Akhmatov, Vladislav; Knudsen, Hans; Nielsen, Arne Hejde

    2000-01-01

    -connected windmills as a part of realistic electrical grid models. That means an arbitrary number of wind farms or single windmills within an arbitrary network configuration. The windmill model may be applied to study of electric power system stability and of power quality as well. It is found that a grid...

  3. Data on loss of off-site electric power simulation tests of the high temperature engineering test reactor

    International Nuclear Information System (INIS)

    Takeda, Takeshi; Nakagawa, Shigeaki; Fujimoto, Nozomu; Tachibana, Yukio; Iyoku, Tatsuo

    2002-07-01

    The high temperature engineering test reactor (HTTR), the first high temperature gas-cooled reactor (HTGR) in Japan, achieved the first full power of 30 MW on December 7 in 2001. In the rise-to-power test of the HTTR, simulation tests on loss of off-site electric power from 15 and 30 MW operations were carried out by manual shutdown of off-site electric power. Because helium circulators and water pumps coasted down immediately after the loss of off-site electric power, flow rates of helium and water decreased to the scram points. To shut down the reactor safely, the subcriticality should be kept by the insertion of control rods and the auxiliary cooling system should cool the core continuously avoiding excessive cold shock to core graphite components. About 50 s later from the loss of off-site electric power, the auxiliary cooling system started up by supplying electricity from emergency power feeders. Temperature of hot plenum block among core graphite structures decreased continuously after the startup of the auxiliary cooling system. This report describes sequences of dynamic components and transient behaviors of the reactor and its cooling system during the simulation tests from 15 and 30 MW operations. (author)

  4. Electricity price and Southern California's water supply options

    Energy Technology Data Exchange (ETDEWEB)

    Dale, Larry [Lawrence Berkeley National Laboratory, Camilla Dunham Whitehead, Andre Fargeix, Golden Gate Economics, 1 Cycltron Road, Berkeley, CA 94720 (United States)

    2004-11-01

    This paper evaluates the impact of fluctuating electricity prices on the cost of five options to increase the water supply to urban areas in Southern California-new surface storage, water purchases, desalination, wastewater recycling, and conservation.We show that the price of electricity required to produce and transport water influences the cost of water supply options and may alter the decision makers economic ranking of these options. When electricity prices are low, water purchase is the cost effective option. When prices exceed US$ 86/MWh, conservation of electricity and water through installation of high efficiency clothes washers is the most effective option.

  5. Improvements in gas supply systems for heavy-water moderated reactors

    International Nuclear Information System (INIS)

    Aubert, G.; Hassig, J.M.; Laurent, N.; Thomas, B.

    1964-01-01

    In a heavy-water moderated reactor cooled by pressurized gas, an important problem from the point of view, of the reactor block and its economics is the choice of the gas supply system. In the pressure tube solution, the whole of the reactor block structure is at a relatively low temperature, whereas the gas supply equipment is at that of the gas, which is much higher. These parts, through which passes the heat carrying fluid have to present as low a resistance as possible to it so as to avoid costly extra blowing power. Finally, they may only be placed in the reactor block after it has been built; the time required for putting them in position should therefore not be too long. The work reported here concerns the various problems arising in the case of each channel being supplied individually by a tube at the entry and the exit which is connected to a main circuit made up of large size collectors. This individual tubing is sufficiently flexible to absorb the differential expansion and the movement of its ends without stresses or prohibitive reactions being produced; the tubing is also of relatively short length so as to reduce the pressure head of the pressurized gas outside the channels; the small amount of space taken up by the tubing makes it possible to assemble it in a manner which is satisfactory from the point of view both of the time required and of the technical quality. (authors) [fr

  6. Optimal design of future electricity supply systems. An analysis of potential bottlenecks in NW-Europe

    International Nuclear Information System (INIS)

    Joode, Jeroen de; Werven, Michiel van

    2005-01-01

    This paper analyses the potential bottlenecks that might emerge in the North-western European electricity supply system as a result of a number of (autonomous) long-term developments. The main long-term developments we identify are 1) a continuing increase in the demand for electricity, 2) a gradual shift from conventional electricity generation towards unconventional (green) generation, 3) a gradual shift from centralized generation towards decentralized generation and 4) a shift from national self-sufficient electricity supply systems towards a pan-European electricity system. Although it has been recognized that these developments might cause certain problems in some or more elements of the electricity supply chain, a coherent and comprehensive framework for the identification of these problems is lacking. More specific, governments and regulators seem to focus on certain parts of the electricity supply system separately, whereas certain interdependencies in the system have received relatively little attention. This paper presents such a framework and identifies some potential bottlenecks that receive relatively little attention from policy makers. These are 1) the increasing penetration of distributed generation, 2) an increasingly important role for demand response and 3) the lack of locational signals in the electricity supply system. The potential role of governments and markets in these issues is briefly explored. (Author)

  7. The green electricity market model. Proposal for an optional, cost-neutral direct marketing model for supplying electricity customers

    International Nuclear Information System (INIS)

    Heinemann, Ronald

    2014-01-01

    One of the main goals of the Renewable Energy Law (EEG) is the market integration of renewable energy resources. For this purpose it has introduced compulsory direct marketing on the basis of a moving market premium. At the same time the green electricity privilege, a regulation which made it possible for customers to be supplied with electricity from EEG plants, has been abolished without substitution with effect from 1 August 2014. This means that, aside from other direct marketing channels, which will not be economically viable save for in a few exceptional cases, it will no longer be possible in future to sell electricity from EEG plants to electricity customers under the designation ''electricity from renewable energy''. The reason for this is that electricity sold under the market premium model can no longer justifiably be said to originate from renewable energy. As a consequence, almost all green electricity products sold in Germany carry a foreign green electricity certificate.

  8. Electrical power supply and controls for a remotely operated glass melter for nuclear waste

    International Nuclear Information System (INIS)

    Haideri, A.Q.

    1985-01-01

    An electrical power supply, controls and instruments used for a joule heated glass melter for nuclear waste are discussed. Remotely replaceable interconnection wiring assemblies for power, controls and instruments are also described

  9. Study on the profitableness of electricity generation with high temperature reactors

    International Nuclear Information System (INIS)

    Kolb, G.

    1978-08-01

    The programme group 'Systemforschung und Technologische Entwicklung' (STE) of the Nuclear Research Centre Juelich in cooperation with the internal institutions 'Projekttraegerschaft Entwicklung von Hochtemperaturreaktoren' (PTH) and 'Institut fuer Reaktorentwicklung' (IRE) on the one hand, and the external partner 'Hochtemperatur-Reactorbau GmbH' (HRB) and 'Gesellschaft fuer Hochtemperaturreactor Technik' (GHT) on the other hand have set up a study on fuel cycle costs, electricity production cost and the economical use as well as uranium resource protection by introduction of high temperature reactors (HTR) with pebble bed core to generate electricity. The pressurized-water reactor (PWR) today on the market serves as comparison. The working results obtained sofar are compiled in the present report. It was particularly noted that - the HTR can economically fully compete with the PWR for electricity generation - the necessary supply of natural uranium for the HTR in open circuit is about one third lower and in the closed circuit, almost two thirds lower than in the corresponding PWR. A further reduction is possible on a long-term basis by highly converting HTW systems. (orig.) [de

  10. Reactor units for power supply to the Russian Arctic regions: Priority assessment of nuclear energy sources

    Directory of Open Access Journals (Sweden)

    Mel'nikov N. N.

    2017-03-01

    Full Text Available Under conditions of competitiveness of small nuclear power plants (SNPP and feasibility of their use to supply power to remote and inaccessible regions the competition occurs between nuclear energy sources, which is caused by a wide range of proposals for solving the problem of power supply to different consumers in the decentralized area of the Russian Arctic power complex. The paper suggests a methodological approach for expert assessment of the priority of small power reactor units based on the application of the point system. The priority types of the reactor units have been determined based on evaluation of the unit's conformity to the following criteria: the level of referentiality and readiness degree of reactor units to implementation; duration of the fuel cycle, which largely determines an autonomy level of the nuclear energy source; the possibility of creating a modular block structure of SNPP; the maximum weight of a transported single equipment for the reactor unit; service life of the main equipment. Within the proposed methodological approach the authors have performed a preliminary ranking of the reactor units according to various criteria, which allows quantitatively determining relative difference and priority of the small nuclear power plants projects aimed at energy supply to the Russian Arctic. To assess the sensitivity of the ranking results to the parameters of the point system the authors have observed the five-point and ten-point scales under variations of importance (weights of different criteria. The paper presents the results of preliminary ranking, which have allowed distinguishing the following types of the reactor units in order of their priority: ABV-6E (ABV-6M, "Uniterm" and SVBR-10 in the energy range up to 20 MW; RITM-200 (RITM-200M, KLT-40S and SVBR-100 in the energy range above 20 MW.

  11. Electric empire

    International Nuclear Information System (INIS)

    McKay, Paul

    1983-01-01

    The author discusses the economic and political aspects of Ontario Hydro, a provincial crown corporation. He also deals with nuclear safety of the CANDU reactors and the ecological effects of electric power supply. Alternate sources of energy are also mentioned

  12. Transformation of the electric power supply chain in competitive markets; Transformacoes da cadeia de suprimentos de energia eletrica em mercados competitivos

    Energy Technology Data Exchange (ETDEWEB)

    Barbosa, Paulo Sergio Franco [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Civil]. E-mail: franco@fec.unicamp.br; Leal, Lydiane Abdon [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica. Dept. de Energia]. E-mail: lyable@bol.com.br

    2002-07-01

    This work presents an analysis of the transformation occurred in the electric power supply chain arising out from the privatization of the electric power sector in Brazil. The analysis includes change aspects concerning to the flux of electric power, information, financial and risk fluxes following the productive and commercialization chain. The work also analyses the british experience for identification of efficiency losses and gains in the management of some pos privatization processes, highlighting companies which experienced evolution in the corporative strategies, obtained from the large period of commercial operation not submitted to non regulated environment.

  13. The electricity supply-demand balance for the winter of 2015-2016. Synthesis - November 2015

    International Nuclear Information System (INIS)

    2015-11-01

    Twice a year, RTE publishes a forecast study of the electricity supply and demand in continental France for the summer and winter periods. The study is based on the information supplied by electric utilities concerning the expected availability of power generation means and on statistical meteorological models. Safety margins are calculated using thousands of probabilistic scenarios combining various production and consumption situations. This report is the forecast study for the winter of 2015-2016

  14. The electricity supply-demand balance for the summer of 2016 - June 2016. Synthesis

    International Nuclear Information System (INIS)

    2016-06-01

    Twice a year, RTE publishes a forecast study of the electricity supply and demand in continental France for the summer and winter periods. The study is based on the information supplied by electric utilities concerning the expected availability of power generation means and on statistical meteorological models. Safety margins are calculated using thousands of probabilistic scenarios combining various production and consumption situations. This report is the forecast study for the summer of 2016

  15. Analysis of tariff levels from electric company in relation to financing request

    International Nuclear Information System (INIS)

    Correa, A.L.S.

    1991-11-01

    The economic-financial model of the Brazilian electric sector is discussed, considering the compatibility of the practiced tariff levels to the demand of consumption market and the production and operation costs. Some institutional actions are identified as solutions for emergency questions and subsides to the big strategies. The economic-finance indicators are also presented, showing the performance of the electrical companies. (C.G.C.)

  16. Sustainable electricity supply in the world by 2050 for economic growth and automotive fuel

    International Nuclear Information System (INIS)

    Kruger, P.

    2010-01-01

    Over the next 40 years, the combustion of fossil fuels for generation of electricity and vehicle transportation will be significantly reduced. In addition to the business-as-usual growth in electric energy demand for the growing world population, new electricity-intensive industries, such as battery electric vehicles and hydrogen fuel-cell vehicles will result in further growth in world consumption of electric energy. Planning for a sustainable supply of electric energy in the diverse economies of the world should be carried out with appropriate technology for selecting the appropriate large-scale energy resources based on their specific energy. Analysis of appropriate technology for the available large-scale energy resources with diminished use of fossil fuel combustion shows that sustainable electricity supply can be achieved with equal contributions of renewable energy resources for large numbers of small-scale distributed applications and nuclear energy resources for the smaller number of large-scale centralised applications. (author)

  17. Correlation of electrical reactor cable failure with materials degradation

    Energy Technology Data Exchange (ETDEWEB)

    Stuetzer, O.M.

    1986-03-01

    Complete circuit failure (shortout) of electrical cables typically used in nuclear power plant containments is investigated. Failure modes are correlated with the mechanical deterioration of the elastomeric cable materials. It is found that for normal reactor operation, electrical cables are reliable and safe over very long periods. During high temperature excursions, however, cables pulled across corners under high stress may short out due to conductor creep. Severe cracking will occur in short times during high temperatures (>150/sup 0/C) and in times of the order of years at elevated temperatures (100/sup 0/C to 140/sup 0/C). A theoretical treatment of stress distribution responsible for creep and for cracking by J.E. Reaugh of Science Applications, Inc. is contained in the Appendix. 29 refs., 32 figs.

  18. Correlation of electrical reactor cable failure with materials degradation

    International Nuclear Information System (INIS)

    Stuetzer, O.M.

    1986-03-01

    Complete circuit failure (shortout) of electrical cables typically used in nuclear power plant containments is investigated. Failure modes are correlated with the mechanical deterioration of the elastomeric cable materials. It is found that for normal reactor operation, electrical cables are reliable and safe over very long periods. During high temperature excursions, however, cables pulled across corners under high stress may short out due to conductor creep. Severe cracking will occur in short times during high temperatures (>150 0 C) and in times of the order of years at elevated temperatures (100 0 C to 140 0 C). A theoretical treatment of stress distribution responsible for creep and for cracking by J.E. Reaugh of Science Applications, Inc. is contained in the Appendix. 29 refs., 32 figs

  19. Quality assurance system in electric power companies in Japan, (2)

    International Nuclear Information System (INIS)

    Hamaguchi, Shun-ichi

    1980-01-01

    The organization for the quality assurance in nuclear power plants of Kansai Electric Power Co., Inc. is introduced. It is still in investigation stage what quality assurance (QA) organization and system is the best. The QA investigation project team was organized in the form directly supervised by the Office of President. The purpose of QA in operation is to maintain the functions of power plants in good condition over the lifetime of the power plants after starting the operation, and the QA is divided into the following five items: (1) running operation, (2) check-up and maintenance, (3) in-service testing and inspection, (4) regular inspection, (5) general application control. The purposes and works to be implemented for these items are listed in a table, and explained in detail. The quality control in regular inspection is described about 4 stages is purchase order and contract, design, construction, and adjusting operation. Also further improvement of QA in operating nuclear power plants by implementing the next items has been decided to make the most of the teachings in the accident of Three Mile Island plant. (1) Reinforcement of operation management system, (2) completion of the training for operators, (3) clarification of the command system for operational control, and (4) change of installations and review of application. As seen in the above description, the important tasks in QA activities are the matching to the existing installations and the adjustment of interfaces with the equipments in operation. (Wakatsuki, Y.)

  20. Application of electric double layer capacitor to pulse coil power supply

    International Nuclear Information System (INIS)

    Abe, Keita; Inomoto, Michiaki; Yamada, Takuma; Kamio, Shuji; Sakumura, Morio; Cao, Qinghong; Ono, Yasushi; Kuwahata, Akihiro; Imazawa, Ryota

    2011-01-01

    We developed a new application of the electric double layer capacitor (EDLC) as a sec-order quasi-DC power supply like flying-wheel motor-generators. We constructed the power supply using IGBT switching circuit and successfully demonstrated its initial operation whose current and duration time are 100 A and 3 sec, respectively, indicating a new potential of EDLC. (author)