WorldWideScience

Sample records for electric utility facilities

  1. A methodology to identify stranded generation facilities and estimate stranded costs for Louisiana's electric utility industry

    Science.gov (United States)

    Cope, Robert Frank, III

    1998-12-01

    The electric utility industry in the United States is currently experiencing a new and different type of growing pain. It is the pain of having to restructure itself into a competitive business. Many industry experts are trying to explain how the nation as a whole, as well as individual states, will implement restructuring and handle its numerous "transition problems." One significant transition problem for federal and state regulators rests with determining a utility's stranded costs. Stranded generation facilities are assets which would be uneconomic in a competitive environment or costs for assets whose regulated book value is greater than market value. At issue is the methodology which will be used to estimate stranded costs. The two primary methods are known as "Top-Down" and "Bottom-Up." The "Top-Down" approach simply determines the present value of the losses in revenue as the market price for electricity changes over a period of time into the future. The problem with this approach is that it does not take into account technical issues associated with the generation and wheeling of electricity. The "Bottom-Up" approach computes the present value of specific strandable generation facilities and compares the resulting valuations with their historical costs. It is regarded as a detailed and difficult, but more precise, approach to identifying stranded assets and their associated costs. This dissertation develops a "Bottom-Up" quantitative, optimization-based approach to electric power wheeling within the state of Louisiana. It optimally evaluates all production capabilities and coordinates the movement of bulk power through transmission interconnections of competing companies in and around the state. Sensitivity analysis to this approach is performed by varying seasonal consumer demand, electric power imports, and transmission inter-connection cost parameters. Generation facility economic dispatch and transmission interconnection bulk power transfers, specific

  2. WRI 50: Strategies for Cooling Electric Generating Facilities Utilizing Mine Water

    Energy Technology Data Exchange (ETDEWEB)

    Joseph J. Donovan; Brenden Duffy; Bruce R. Leavitt; James Stiles; Tamara Vandivort; Paul Ziemkiewicz

    2004-11-01

    Power generation and water consumption are inextricably linked. Because of this relationship DOE/NETL has funded a competitive research and development initiative to address this relationship. This report is part of that initiative and is in response to DOE/NETL solicitation DE-PS26-03NT41719-0. Thermal electric power generation requires large volumes of water to cool spent steam at the end of the turbine cycle. The required volumes are such that new plant siting is increasingly dependent on the availability of cooling circuit water. Even in the eastern U.S., large rivers such as the Monongahela may no longer be able to support additional, large power stations due to subscription of flow to existing plants, industrial, municipal and navigational requirements. Earlier studies conducted by West Virginia University (WV 132, WV 173 phase I, WV 173 Phase II, WV 173 Phase III, and WV 173 Phase IV in review) have identified that a large potential water resource resides in flooded, abandoned coal mines in the Pittsburgh Coal Basin, and likely elsewhere in the region and nation. This study evaluates the technical and economic potential of the Pittsburgh Coal Basin water source to supply new power plants with cooling water. Two approaches for supplying new power plants were evaluated. Type A employs mine water in conventional, evaporative cooling towers. Type B utilizes earth-coupled cooling with flooded underground mines as the principal heat sink for the power plant reject heat load. Existing mine discharges in the Pittsburgh Coal Basin were evaluated for flow and water quality. Based on this analysis, eight sites were identified where mine water could supply cooling water to a power plant. Three of these sites were employed for pre-engineering design and cost analysis of a Type A water supply system, including mine water collection, treatment, and delivery. This method was also applied to a ''base case'' river-source power plant, for comparison. Mine

  3. State-of-the-art assessment of requirements for attachments of WiFi equipments to electric utility facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-01

    Electric utilities are receiving a growing number of requests to attach WiFi equipment to their systems. However, many utilities are not prepared to meet these requests because they have not had enough time to formally review and comment on the particular issues associated with Wi-Fi attachments. Although electric utilities are required to allow the attachments, there is no uniform standard to govern those attachments. This paper discussed the state-of-the-art philosophies and requirements of electric utilities who have allowed WiFi equipment on their systems. The advantages and limitations of each philosophy or practice were also discussed. The requirements for codes and standards in the United States and Canada for high voltage construction were also evaluated.

  4. Electric utility report '80

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    A collection of brief atricles describes the trends and developments in Canada's electric utilities for the 1980's. Generating stations planned or under construction are listed. The trends in technology discused at a recent Canadian Electrical Association meeting are summarized in such areas as turbine stability control, power line vibration control, system reliability, substations and transformer specifications. Developments in nuclear generation are discussed and compared on the world scale where Japan, for example, has the world's largest nuclear program. Progress on fusion is discussed. In Canada the electric utilities are receiving the support of the comprehensive nuclear R and D program of Atomic Energy of Canada Ltd. New innovations in utility technology such as street lighting contactors, superconductive fault limiters and demand profile analyzers are discussed. (T.I.)

  5. Power Sales to Electric Utilities

    Energy Technology Data Exchange (ETDEWEB)

    None

    1989-02-01

    The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities interconnect with qualifying facilities and purchase electricity at a rate based upon their full avoided costs (i.e., costs of providing both capacity and energy). Qualifying facilities (QF) include solar or geothermal electric units, hydropower, municipal solid waste or biomass-fired power plants, and cogeneration projects that satisfy maximum size, fuel use, ownership, location, and/or efficiency criteria. In Washington State, neither standard power purchase prices based upon a proxy ''avoided plant'', standard contracts, or a standard offer process have been used. Instead, a variety of power purchase contracts have been negotiated by developers of qualifying facilities with investor-owned utilities, public utility districts, and municipally-owned and operated utilities. With a hydro-based system, benefits associated with resource acquisition are determined in large part by how compatible the resource is with a utility's existing generation mix. Power purchase rates are negotiated and vary according to firm energy production, guarantees, ability to schedule maintenance or downtime, rights of refusal, power plant purchase options, project start date and length of contract; front-loading or levelization provisions; and the ability of the project to provide ''demonstrated'' capacity. Legislation was also enacted which allows PURPA to work effectively. Initial laws established ownership rights and provided irrigation districts, PUDs, and municipalities with expanded enabling powers. Financial processes were streamlined and, in some cases, simplified. Finally, laws were passed which are designed to ensure that development proceeds in an environmentally acceptable manner. In retrospect, PURPA has worked well within Washington. In the state of Washington, 20 small-scale hydroelectric projects with a combined generating capacity of

  6. Electric utilities in Illinois

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    Although the conference dealt specifically with concerns of the electric utilities in Illinois, the issues were dealt with in the national context as well. A separate abstract was prepared for each of the 5 sections of this proceeding. A total of 25 papers were presented. Section titles are: Forecasting, Planning and Siting, Reliability, Rates and Financing, and Future Developments.

  7. Electric utilities in 2007

    Energy Technology Data Exchange (ETDEWEB)

    Hyman, L.S. [Smith Barney Inc., New York, NY (United States)

    1998-10-01

    A century ago--in the year J.J. Thomson discovered the electron--electricity, gas and traction companies battled for markets, and corrupt city councils demanded their fair share of the take. One tycoon became so disgusted with the confusion and dishonesty that he decided to bribe the legislature to set up an honest, state-run regulatory agency that would bring order to chaos. But he was found out. The scandal set back the cause of regulation until 1907, the year in which the electric washing machine and the vacuum cleaner were invented. By then, electricity sales had septupled from 1897 levels, and three states had established utility regulation. In the coming decade, 1997 to 2007, the utility business could undergo similar dramatic change, but it will move toward less regulation and more competition during a period of slow growth. Management will have to work harder to achieve success, however, because much of the profits will have to come not from a growing market but from the pockets of competitors. By 2007, electricity will constitute a component of a larger energy and utility services industry that sells electricity, natural gas and possibly water, propane and telecommunications. Customized service will meet the needs of consumers of all sizes. The dominant firm in the industry, the virtual utility, may look more like a financial organization or a mass marketer than the traditional converter of raw material to energy. Emphasis on market-based pricing should lead to more efficient use of resources. If the process works right, the consumer wins.

  8. Electricity utilities: Nuclear sector

    International Nuclear Information System (INIS)

    Brosche, D.

    1992-01-01

    The safe and economic operation of nuclear power plants requires an appropriate infrastructure on the part of the operator as well as a high level of technical quality of the plants and of qualification of the personnel. Added to this are a variety of services rendered by specialist firms. The Bayernwerk utility, with plants of its own, has played a major role in the development of nuclear power in the Federal Republic of Germany. The importance of nuclear power to this firm is reflected in the pattern of its electricity sources and in the composition of its power plants. (orig.) [de

  9. Market research for electric utilities

    International Nuclear Information System (INIS)

    Shippee, G.

    1999-01-01

    Marketing research is increasing in importance as utilities become more marketing oriented. Marketing research managers need to maintain autonomy from the marketing director or ad agency and make sure their work is relevant to the utility's operation. This article will outline a model marketing research program for an electric utility. While a utility may not conduct each and every type of research described, the programs presented offer a smorgasbord of activities which successful electric utility marketers often use or have access to

  10. VT Electric Utility Franchise Areas

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) ELCFRANCHISE includes Vermont's Electric Utility Franchise boundaries. It is a compilation of many data sources. The boundaries are approximate...

  11. Privatization of municipal electrical utilities

    International Nuclear Information System (INIS)

    Carr, J.

    1998-01-01

    The challenges and special issues which arise through the sale of a municipal electric utility were discussed. The recent sales of two utilities, the Kentville Electric Commission in Nova Scotia and Cornwall Electric in Ontario, were used as examples to show how the sale of an electric utility differs from the sale of most business enterprises. Municipal utilities are integral parts of the communities they serve which introduces several complexities into the sale. Factors that require special attention in the sale of the utilities, including electricity rates, local accountability, treatment of employees and local economic development, and the need for a comprehensive communication program to deal with the substantial public interest that sale of a municipal utility will engender, were reviewed

  12. Market research for electric utilities

    Energy Technology Data Exchange (ETDEWEB)

    Shippee, G.

    1999-12-01

    Marketing research is increasing in importance as utilities become more marketing oriented. Marketing research managers need to maintain autonomy from the marketing director or ad agency and make sure their work is relevant to the utility's operation. This article will outline a model marketing research program for an electric utility. While a utility may not conduct each and every type of research described, the programs presented offer a smorgasbord of activities which successful electric utility marketers often use or have access to.

  13. Markets for utility electricity

    International Nuclear Information System (INIS)

    Brooks, D.B.

    1990-01-01

    Every analysis of energy use, no matter what the sector or the country, has shown enormous opportunities for cost-effective conservation. Such opportunities should be identified and pursued wherever they appear. Because of its capital intensity and balance-of-payments implications on the supply side, and its potential to improve industrial efficiency and quality of life on the demand side, nowhere are such opportunities more critical than with electricity. Indeed, given the large and unsatisfied demand for electricity in those markets where it can be used efficiently, to ignore those opportunities is to invite ever more serious energy supply and demand problems. (author). 34 refs., 3 tabs., 1 appendix

  14. Electric energy utilization and conservation

    International Nuclear Information System (INIS)

    Tripathy, S.C.

    1991-01-01

    Various aspects of electric energy utilization and conservation are discussed. First chapter reviews thermodynamic aspects of energy conservation. Subsequent chapters describe possibilities and methods of energy conservation in thermal power plants, airconditioning and ventilation systems, electric lighting systems, electric heating systems in industries, and railway electrification. Chapter 8 describes various modes of energy storage and compares their economies. The next chapter discusses various facets of energy economics and the last chapter discusses the practical aspects of energy conservation in different industries and power utilities. (M.G.B.). 100 refs

  15. Power Electronics and Electric Machines Facilities | Transportation

    Science.gov (United States)

    Research | NREL Facilities Power Electronics and Electric Machines Facilities NREL's power electronics and electric machines thermal management experimentation facilities feature a wide range of four researchers in discussion around a piece of laboratory equipment. Power electronics researchers

  16. Economical electricity supply and utilization

    Energy Technology Data Exchange (ETDEWEB)

    Madsen, K

    1980-05-01

    During the first oil crisis in 1973, hundreds of millions of D-marks have been wasted by medium-sized businesses in the FRG due to avoidable losses and increased electricity costs. Serious attempts towards excluding such losses have to be initiated by an analysis of the individual technical conditions of an enterprise and by consultations 'on site'. Problems relating to an economical electricity supply and utilization in medium-sized industrial enterprises are discussed in this article from the point of view of an industrial consultant being an expert in this field. Practical examples are also given.

  17. The Ursern electricity utility - Positive and negative aspects

    International Nuclear Information System (INIS)

    Niederhaeusern, A.

    2008-01-01

    In this interview with Markus Russi, head of an electricity utility in the Swiss Alps, recent Swiss legislation such as the Energy law and the cost-covering remuneration of power from renewable energy sources is discussed. The production of the power generation facilities belonging to the utility - hydropower and wind energy - is discussed and future refurbishment and expansion work noted. The situation in the electricity market and co-operation with other local electricity utilities are also discussed and various disadvantages of the new Swiss electricity market legislation are noted. Future partnerships with other utilities with similar business strategies are discussed.

  18. Environmental compliance audits of electric generating facilities - a practical approach

    International Nuclear Information System (INIS)

    Staker, R.D.

    1992-01-01

    As environmental regulations expand in complexity and number, and as regulatory agencies place more emphasis on enforcing regulations, it is increasingly important that electric utilities perform periodic environmental compliance audits to determine if their facilities are in compliance with federal, state, and local environmental regulations. Explicit commitment by the utility's top management and careful planning and execution of an audit are key elements in the effectiveness of an audit. This paper is directed to electric utility environmental managers and company management. The paper presents a practical approach for planning and performing a multi-media environmental compliance of an electric generating facility

  19. Transforming your Municipal Electric Utility

    International Nuclear Information System (INIS)

    Harper, P.

    1999-01-01

    A series of overhead viewgraphs accompanied this presentation which focused on what municipalities should and can do to prepare for a competitive energy market in Ontario. Particular attention was given to business strategies, restructuring and transformation of the Municipal Electric Utilities (MEU). Issues and questions regarding ownership were also discussed. Each municipality will have to decide what is the most appropriate governance and organizational structure for their MEU. It was noted that one of the most contentious areas is refinancing and rate structures. Issues regarding merger or partnering options were also discussed. 1 tab

  20. Electric utilities and clean air

    International Nuclear Information System (INIS)

    Evans, J.E.

    1991-01-01

    This paper reports that electricity has become essential to American life. Approximately 70 percent of the nation's electricity is produced by burning fossil fuels, with coal, the most abundant, domestically-available, extracted natural resource, providing over 55 percent of the total electricity consumed. Emissions resulting from the burning of fossil fuels are regulated by both the federal and state governments. In 1970, Congress passed the comprehensive Clean Air Act which established a national program to protect the nation's air quality. In 1977, additional strict regulations were passed, which mandated even more stringent emission controls for factories, power plants and auto emissions. Prior to passage of the Clean Air Act of 1990, utilities were required to adhere to three major types of clean air regulations: National Ambient Air Quality Standards (NAAQS), New Source Performance Standards (NSPS), and Prevention of Significant Deterioration (PSD) review. NAAQS established limits for the maximum concentration levels of specific air pollutants in the ambient atmosphere. For example, for an area to be in compliance with the NAAQS for sulfur dioxide (SO 2 ), its annual average SO 2 concentration must not exceed 0.03 ppm of SO 2 and a peak 24 hour level of 0.14 ppm of SO 2 must not be exceeded more than once per year

  1. Utilizing Interns in Facilities Management

    Science.gov (United States)

    Judkins, Clarissa; Morris, John P.; Molocznik, Chuck

    2011-01-01

    Facilities management is rapidly changing and developing from a position an individual stumbles into--or work one's way up through--to a discipline and vocation all of its own. There is a need for a collaborative strategy among leaders in practice, education, and research to share knowledge and experience and to establish professional and ethical…

  2. Quality electric motor repair: A guidebook for electric utilities

    Energy Technology Data Exchange (ETDEWEB)

    Schueler, V.; Douglass, J.

    1995-08-01

    This guidebook provides utilities with a resource for better understanding and developing their roles in relation to electric motor repair shops and the industrial and commercial utility customers that use them. The guidebook includes information and tools that utilities can use to raise the quality of electric motor repair practices in their service territories.

  3. Electric vehicle utilization for ancillary grid services

    Science.gov (United States)

    Aziz, Muhammad

    2018-02-01

    Electric vehicle has been developed through several decades as transportation mean, without paying sufficient attention of its utilization for other purposes. Recently, the utilization of electric vehicle to support the grid electricity has been proposed and studied intensively. This utilization covers several possible services including electricity storage, spinning reserve, frequency and voltage regulation, and emergency energy supply. This study focuses on theoretical and experimental analysis of utilization of electric vehicles and their used batteries to support a small-scale energy management system. Charging rate of electric vehicle under different ambient temperature (seasonal condition) is initially analyzed to measure the correlation of charging rate, charging time, and state-of-charge. It is confirmed that charging under warmer condition (such as in summer or warmer region) shows higher charging rate than one in colder condition, therefore, shorter charging time can be achieved. In addition, in the demonstration test, each five electric vehicles and used batteries from the same electric vehicles are employed and controlled to support the electricity of the office building. The performance of the system is evaluated throughout a year to measure the load leveling effect during peak-load time. The results show that the targeted peak-load can be shaved well under certain calculated peak-shaving threshold. The finding confirms that the utilization of electric vehicle for supporting the electricity of grid or certain energy management system is feasible and deployable in the future.

  4. Factors influencing electric utility expansion. Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Masud, E. [ed.

    1977-01-01

    This report, Vol. 2, submitted by the General Electric Co., identifies factors that should be considered in planning interconnected systems and discusses how these factors relate to one another. The objective is to identify all the factors and classify them by their use and importance in arriving at a decision. Chapter 2 discusses the utility system and its system behavior characteristics, emphasizing behavior that affects the planning of the bulk-power generation and transmission system. Chapter 3 introduces interconnection planning by discussing the new system characteristics brought to operation and planning. Forty-two factors associated with cost, reliability, constraints, and coordination are related to each other by factor trees. Factor trees display the relationship of one factor such as reliability to more-detailed factors which in turn are further related to individual characteristics of facilities. These factor trees provide a structure to the presentation. A questionnaire including the 42 factors was completed by 52 system planners from utility companies and government authorities. The results of these questionnaires are tabulated and presented with pertinent discussion of each factor. Chapter 4 deals with generation planning, recognizing the existence of interconnections. Chapter 5 addresses transmission planning, questions related to reliability and cost measures and constraints, and factors related to both analytical techniques and planning procedures. The chapter ends with a discussion of combined generation-transmission planning. (MCW)

  5. Electric utility companies and geothermal power

    Science.gov (United States)

    Pivirotto, D. S.

    1976-01-01

    The requirements of the electric utility industry as the primary potential market for geothermal energy are analyzed, based on a series of structured interviews with utility companies and financial institution executives. The interviews were designed to determine what information and technologies would be required before utilities would make investment decisions in favor of geothermal energy, the time frame in which the information and technologies would have to be available, and the influence of the governmental politics. The paper describes the geothermal resources, electric utility industry, its structure, the forces influencing utility companies, and their relationship to geothermal energy. A strategy for federal stimulation of utility investment in geothermal energy is suggested. Possibilities are discussed for stimulating utility investment through financial incentives, amelioration of institutional barriers, and technological improvements.

  6. Outlook for California's electric utility industry

    International Nuclear Information System (INIS)

    Frank, S.E.

    1996-01-01

    This article describes how the Southern California Edison Company deals with revolutionary change as the state's electricity industry reinvents itself. The topics of the article include how competition has make things better for SCEC's employees, customers, and shareholders, and an outline of the principal features of the electric utility industry in California

  7. Inter-utility trade in electricity

    International Nuclear Information System (INIS)

    Penman, A.

    1992-01-01

    Enhanced inter-utility cooperation could have a profound effect on the future of the electricity supply industry. Coordinated planning, development, and operations of electric power systems have the potential to reduce the cost of electricity to consumers and to lessen the impact of electricity supply on the environment. These effects could be achieved by being able to supply electricity from lower cost and more environmentally benign sources located over wider geographic areas, and having to install less new generating capacity. Access to transmission and wheeling services would be an important factor in allowing increased inter-utility cooperation to occur. Canada's National Energy Board conducted a review to identify measures that can be taken to enhance interprovincial trade in electricity, to encourage greater cooperation between electric utilities in the areas of systems planning and development, and to enable buyers and sellers of electricity to obtain access to available transmission capacity through intervening provinces for wheeling purposes. The work undertaken by the Board during that review is described. A total estimated economic benefit of $23-32.5 billion was identified, mainly from long-term firm sales and from seasonal diversity exchanges. Four options were developed that appear to be available to encourage and achieve enhanced inter-utility cooperation. These are continuation of voluntary cooperation, voluntary cooperation with federal monitoring, establishing voluntary regional planning entities, and establishing regional planning entities with mandated federal power

  8. On-site electric power source facility for Japanese nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Oohara, T. [Incident/Failure Analysis and Evaluation Office, Nuclear Power Safety Information Research Centre, Nuclear Power Engineering Test Centre, 2nd Floor, Shuwa-Kamiyacho Bldg., 3-13, 4-Chome, Toranomon Minato-ku, Tokyo 105 (Japan)

    1986-02-15

    Trends of construction of nuclear power plants in Japan, occurrence rate of incidents/failures of electric facilities, major example of incidents/failures, their countermeasure to prevent recurrence are introduced. Furthermore, safety administration system of the Government, electric utilities and manufacturers, and various countermeasures to prevent incident/ failure of electrical facilities from the hardware and software sides are discussed. (author)

  9. On-site electric power source facility for Japanese nuclear power plant

    International Nuclear Information System (INIS)

    Oohara, T.

    1986-01-01

    Trends of construction of nuclear power plants in Japan, occurrence rate of incidents/failures of electric facilities, major example of incidents/failures, their countermeasure to prevent recurrence are introduced. Furthermore, safety administration system of the Government, electric utilities and manufacturers, and various countermeasures to prevent incident/ failure of electrical facilities from the hardware and software sides are discussed. (author)

  10. Electric utilities strategies in final energy markets

    International Nuclear Information System (INIS)

    Bianchi, A.

    2000-01-01

    In rapidly changing markets, electric utilities pay growing attention to customers and service. They are aware that competition needs strategies capable of transforming and strengthening the privileged position resulting from the knowledge of the market. Moreover, this aspect is the link between different value chains to describe new multi utility approaches [it

  11. Impact of the legislation on electric utilities

    International Nuclear Information System (INIS)

    De Long, M.

    1982-01-01

    The possible impact of Federal nuclear waste legislation on electric utilities is discussed. The proposed legislation will set forth a well defined program enabling utilities with nuclear plants to make long term plans under a statutory mandate committed to an available technology and implementation timetable. The legislation includes the necessary specificity for the utility companies to fulfill their responsibilities in describing their waste disposal plans to their customers, the concerned public, and state and local legislators

  12. Service to the Electric Utility Industry by the Ford Nuclear Reactor, University of Michigan

    International Nuclear Information System (INIS)

    Burn, R.R.; Simpson, P.A.; Cook, G.M.

    1993-01-01

    Since 1977, the staff of the University of Michigan's Ford Nuclear Reactor has been providing irradiation, testing, analytical, and training services to electric utilities and to suppliers of the nuclear electric utility industry. This paper discusses the reactor's irradiation facilities; reactor programs and utilization; materials testing programs; neutron activation analysis activities; and training programs conducted

  13. Turmoil and transition: Electric utility industry trends

    International Nuclear Information System (INIS)

    1994-06-01

    In a review of electric utility industry trends, focusing on North America, it is noted that four critical influences are dominant: competition in the electricity supply business; technological advances; the recognized need for environmental protection; and a favoring of market economics and customer choice. As energy costs rose in the 1970s and 1980s, electricity usage growth rates decreased and demand side management became an accepted alternative to building new power plants. In large areas of Canada and the USA, substantial surplus generation capacity arose, transmission linkages improved, and regional electricity markets developed. Privatization measures in the British electric sector were closely studied in North America and electric markets in the USA were pushed toward more competition with the 1992 Energy Policy Act. Non-utility generators have entered the market, including industrial companies, pipeline companies, independent renewable-energy providers, and power companies set up by the utilities themselves. Power pools may evolve into regional transmission grids in which the transmission owning utilities would exchange their lines for an interest in the grid. California is likely to lead in opening access to transmission on a regional scale. Distribution systems are likely to remain a regulated monopoly as before. Substantial change is expected in customer services as functions such as power purchase and conservation are being performed by independent companies. Other possible developments in the industry include emissions trading and spot markets for power. The implications of these trends for British Columbia Hydro are discussed

  14. Competition in the electric utility sector?

    International Nuclear Information System (INIS)

    Olsen, O.J.; Fristrup, P.; Munksgaard, J.; Skytte, K.

    2000-01-01

    The book analyses some important problems for the liberaliaction of the electricity market in Denmark and its neighbouring countries. Will the competition and its potential for a more cost-effective electric supply be prevented by the electric companies' many possibilities to utilize market power? Can competition be combined with ambitious energy policy aims about reducing the environmental impacts of the electric supply? Does the Danish tradition for consumer ownership constitute an important supplement to the protection of the smaller consumers in a world of international competition? The intention with the book is not to take concrete position to the many topical problems in the Danish political discussion of restructurns of the electric sector, but to give a theoretical analysis to understand and analyse the development. On this basis the conclusion is, that the competition will work even in combination with ambitious environmental aims. (EHS)

  15. Shaping the future of electric utilities

    International Nuclear Information System (INIS)

    Byus, L.C.

    1993-01-01

    On December 14, 1992, Cincinnati Gas ampersand Electric Company (CG ampersand E) and PSI Resources, Inc. announced an agreement to merge the two companies into a newly formed company, CINergy Corp. In announcing the proposed merger, James E. Rogers Jr., chairman, president, and chief executive officer of PSI said, Our companies have chosen to shape our future and our industry. This is an ideal partnership, since our strengths complement each other and our vision of the future is the same. Will this merger be the first of many that will shape the future of the electric utility in the United States? What is the vision of the future for the industry? About five years ago, a well-known Wall Street utility analyst traveled around the country talking about the anticipated consolidation of electric utility companies in the US His motto was Fifty in Five, meaning widespread consolidation that would reduce the number of independent investor-owned utilities from more than 100 to 50 within a five-year period. He even developed a map showing the mergers/consolidations he looked for and actually named names. More than five years have passed, and only a handful of utility mergers have taken place. But, looking forward from 1992, restructuring of the utility industry is very much a vision of the future. What is the driving force? The National Energy Policy Act of 1992 provides the legislative framework for the electric utility industry in the US in future years. While the specific rules that will govern the industry are yet to be promulgated, the intent to allow (even promote) competition is evident in the Act itself. But it appears the vision of the future is market driven

  16. Electric utilities look back on 1998

    International Nuclear Information System (INIS)

    Anon.

    1999-01-01

    A review of activities in the electric power industry in Canada during 1998 is presented. In general, the principal preoccupation of Canadian electric utilities in 1998 was preparation for competition in a deregulated energy market. Utilities worked with provincial and national legislatures to redraw the rules of power supply. US FERC order 888 was central to many debates. FERC order 888 stipulates the unbundling of the retail aspects of operations from those that will remain regulated. Electric utilities also continued to prepare for the Y2K phenomenon and to work towards achieving ISO 14001 environmental management accreditation. They also explored alternative means of power generation. The year began with utilities across Canada sharing expertise and manpower to mitigate the impact of the ice storm which devastated parts of Quebec, Ontario and New Brunswick. It is believed that as a result of the ice storm of 1998, the Canadian utility industry is much better prepared to deal with weather-related emergencies than ever before. 1 fig

  17. Electric utility deregulation - A nuclear opportunity

    International Nuclear Information System (INIS)

    DeMella, J.R.

    2002-01-01

    The implications of electric deregulation are and will continue to be pervasive and significant. Not only will the fundamental monopoly regulatory concepts of managing electric utilities change but deregulation will have a profound and dramatic impact on the way electric generating plants are managed and operated. In the past, under the various approaches to financial regulation, the economic benefits normally attributed to competition or that would have otherwise been derived from competitive or open market forces, were assumed to be embodied in and inherent to the various processes, methods and principles of financial oversight of utility companies by regional, state and municipal regulatory authorities. Traditionally, under the various forms of regulated monopolies, a utility company, in exchange for an exclusive franchise to produce and sell electricity in a particular region, was obligated to provide an adequate supply to all consumers wanting it, at a price that was 'just and reasonable'. The determination of adequate supply and reasonable price was a matter of interpretation by utility companies and their regulators. In essence, the ultimate economic benefits, normally attributed to price equilibrium, in balance with supply, demand and other market forces, were expected to be achieved through a complex, political process of financial regulatory oversight, in which utility companies were usually reimbursed for all annual expenses or their 'cost of service' and additionally allowed to earn a 'reasonable' rate of return on plant investments. The result was often escalating electric prices, over supplies of electric capacity, by justifying unnecessarily high reserve margins based on long planning horizons (typically 20 years or greater) with extrapolated demand requirements that were generally in excess of what actually occurred over time. Although the regulatory process varied from country or country and region-to-region, the fundamental principles, which

  18. High slot utilization systems for electric machines

    Science.gov (United States)

    Hsu, John S

    2009-06-23

    Two new High Slot Utilization (HSU) Systems for electric machines enable the use of form wound coils that have the highest fill factor and the best use of magnetic materials. The epoxy/resin/curing treatment ensures the mechanical strength of the assembly of teeth, core, and coils. In addition, the first HSU system allows the coil layers to be moved inside the slots for the assembly purpose. The second system uses the slided-in teeth instead of the plugged-in teeth. The power density of the electric machine that uses either system can reach its highest limit.

  19. The electric utilities in 1989 - A perspective

    International Nuclear Information System (INIS)

    Studness, C.M.

    1990-01-01

    This article presents the performance of electric utilities financially and in the stock market. The performance of the utility stocks compared with industrial stocks and long term government bonds is addressed as well as an analysis of the reasons for the differences. The effect of rate increases granted versus the rate of inflation on per share earnings is examined. A concern was expressed that increases in demand substantially larger than those projected by the industry for 1989 may result in excess capacity disappearing much sooner than predicted by industry managements

  20. Positioning the electric utility to build information infrastructure

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-01

    In two particular respects (briefly investigated in this study from a lawyer`s perspective), electric utilities appear uniquely well-positioned to contribute to the National Information Infrastructure (NII). First of all, utilities have legal powers derived from their charters and operating authorities, confirmed in their rights-of-way, to carry out activities and functions necessary for delivering electric service. These activities and functions include building telecommunications facilities and undertaking information services that have become essential to managing electricity demand and supply. The economic value of the efficiencies made possible by telecommunications and information could be substantial. How great remains to be established, but by many estimates electric utility applications could fund a significant share of the capital costs of building the NII. Though utilities` legal powers to pursue such efficiencies through telecommunications and information appear beyond dispute, it is likely that the effort to do so will produce substantial excess capacity. Who will benefit from this excess capacity is a potentially contentious political question that demands early resolution. Will this windfall go to the utility, the customer, or no one (because of political paralysis), or will there be some equitable and practical split? A second aspect of inquiry here points to another contemporary issue of very great societal importance that could very well become the platform on which the first question can be resolved fortuitously-how to achieve universal telecommunications service. In the effort to fashion the NII that will now continue, ways and means to maximize the unique potential contribution of electric utilities to meeting important social and economic needs--in particular, universal service--merit priority attention.

  1. Waste utilization in electric energy industry

    International Nuclear Information System (INIS)

    Parate, N.S.; Harris, E.

    1991-01-01

    This paper reports that electric energy is an integral element of today's economy and the standard quality of life. The availability of energy at an affordable cost has always been of basic concern because of the intimate relationship of energy to our societal development and progress. Coal and Uranium are the primary alternative energy sources for large electric power plants. Coal remains the dominant fuel for electric generation. The pressurized fluidized bed combustion technology has the potential of utilizing all types of coal, including coal with high ash, high sulphur, and high moisture content. Fluidized bed combustion is a firing technique which fulfills today's pollution control requirements without downstream flue gas cleaning plants like scrubbers, baghouses, and precipitators

  2. Evaluation of the electric utility missions

    International Nuclear Information System (INIS)

    Syrota, J.

    2000-01-01

    The French law from February 10, 2000, about the modernization and development of the electric utility, has created new missions of public utility and foresees some compensation mechanisms for not handicapping the power operators in charge of these missions and for not creating competition distortions to their detriment on the European market. The author explains, first, the financial and economical stakes linked with these new missions. Then, he evokes the evolution of the energy context that has taken place between the 2. World war and the enforcement of the February 10, 2000 law, and he analyzes the systems foreseen for the power generation and distribution. For each public utility charge, the existing dispositions and those introduced by the law are analyzed and compared to the equivalent systems existing in other countries. Then, charge evaluation criteria and sharing rules and proposed. (J.S.)

  3. Utility Sector Impacts of Reduced Electricity Demand

    Energy Technology Data Exchange (ETDEWEB)

    Coughlin, Katie

    2014-12-01

    This report presents a new approach to estimating the marginal utility sector impacts associated with electricity demand reductions. The method uses publicly available data and provides results in the form of time series of impact factors. The input data are taken from the Energy Information Agency's Annual Energy Outlook (AEO) projections of how the electric system might evolve in the reference case, and in a number of side cases that incorporate different effciency and other policy assumptions. The data published with the AEO are used to define quantitative relationships between demand-side electricity reductions by end use and supply-side changes to capacity by plant type, generation by fuel type and emissions of CO2, Hg, NOx and SO2. The impact factors define the change in each of these quantities per unit reduction in site electricity demand. We find that the relative variation in these impacts by end use is small, but the time variation can be significant.

  4. Energy economics: impacts on electric utilities' future decisions

    International Nuclear Information System (INIS)

    Smith, S.H.

    1983-01-01

    Despite financial and regulatory pressures that have led electric utilities to slow construction and minimize capital expenditures, Carolina Power and Light Company is proceeding with two new nuclear and two new coal facilities because it believes the commitment to expand must be made in the 1980s. The economic slowdown has given utilities a breathing period, but not enough to allow a complete stop in expansion if the utilities are to be ready for the expected economic growth of the 1990s. Financing this expansion is a slower process for regulated industries and leads to strained relations between customers and suppliers. The two can work together to promote conservation and load management, but higher rates must finance new construction to avoid a shortfall later. The costs of environmentally sound coal combustion and nuclear plant construction must both be reduced to help keep the recovery from being inflationary

  5. Transmission cost minimization strategies for wind-electric generating facilities

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez, R. [Northern States Power Company, Minneapolis, MN (United States)

    1997-12-31

    Integrating wind-electric generation facilities into existing power systems presents opportunities not encountered in conventional energy projects. Minimizing outlet cost requires probabilistic value-based analyses appropriately reflecting the wind facility`s operational characteristics. The wind resource`s intermittent nature permits relaxation of deterministic criteria addressing outlet configuration and capacity required relative to facility rating. Equivalent capacity ratings of wind generation facilities being a fraction of installed nameplate rating, outlet design studies contingency analyses can concentrate on this fractional value. Further, given its non-dispatchable, low capacity factor nature, a lower level of redundancy in outlet facilities is appropriate considering the trifling contribution to output unreliability. Further cost reduction opportunities arise from {open_quotes}wind speed/generator power output{close_quotes} and {open_quotes}wind speed/overhead conductor rating{close_quotes} functions` correlation. Proper analysis permits the correlation`s exploitation to safely increase line ratings. Lastly, poor correlation between output and utility load may permit use of smaller conductors, whose higher (mostly off-peak) losses are economically justifiable.

  6. Financial statistics of major publicly owned electric utilities, 1991

    International Nuclear Information System (INIS)

    1993-01-01

    The Financial Statistics of Major Publicly Owned Electric Utilities publication presents summary and detailed financial accounting data on the publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with data that can be used for policymaking and decisionmaking purposes relating to publicly owned electric utility issues

  7. Financial statistics of major publicly owned electric utilities, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-31

    The Financial Statistics of Major Publicly Owned Electric Utilities publication presents summary and detailed financial accounting data on the publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with data that can be used for policymaking and decisionmaking purposes relating to publicly owned electric utility issues.

  8. Financial statistics of major investor-owned electric utilities, 1991

    International Nuclear Information System (INIS)

    1993-01-01

    The Financial Statistics of major Investor-Owned Electric Utilities publication presents summary and detailed financial accounting data on the investor-owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decisionmaking purposes related to investor-owned electric utility issues

  9. IT use in electric utilities - today and tomorrow

    International Nuclear Information System (INIS)

    Persson, Maria

    1998-01-01

    A survey of the present and future use of IT-systems in British electric utilities is presented. Systems for Asset Management, Reliability Centered Maintenance, Customer Databases etc are discussed. A few utilities are studied more closely (Eastern Electricity, London Electricity, Scottish Power and Yorkshire Electricity)

  10. Facility Utilization Reports - FAA Aviation Information Utilization Reports

    Data.gov (United States)

    Department of Transportation — Provides: (1) Space management and planning, including area calculations, tracking space by organization and employee, and monitoring space utilization information....

  11. Distribution and Utilization of Health Facilities in Calabar Metropolis ...

    African Journals Online (AJOL)

    The level of accessibility increases with increasing utilization. Distance was a barrier to the utilization of health facilities due to the uneven distribution of health facilities and the inability of patients to overcome economic distance. Greater investment by government in the health sector would guarantee more equitable access ...

  12. Parametric utility comparison of coal and nuclear electricity generation

    International Nuclear Information System (INIS)

    Maurer, K.M.

    1977-02-01

    The advantages and limitations of an explicit quantitative model for decision making are discussed. Several different quantitative models are presented, noting that the use of an expected utility maximization decision rule allows both the direct incorporation of multidimensional descriptions of the possible outcomes, and considerations of risk averse behavior. A broad class of utility functions, characterized by linear risk tolerance, was considered and extended to a multidimensional form. Choosing a multivariate risk neutral extension, using constant absolute risk aversion utility functions for monetary effects and for increased mortality, the author indicated how the parameters of this utility function can be selected to represent the decision maker's preferences, and suggest a reasonable range of values for the parameters. After describing an illustrative set of data on the risks inherent in coal burning and nuclear electricity generation facilities, the author used the chosen utility model to compare the overall risks associated with each technology, observing the effect of variations in the utility parameters and in the risk distributions on the implied preferences

  13. Citizen Advisory Council use in the electric utility industry

    International Nuclear Information System (INIS)

    McElfresh, R.W.

    1991-01-01

    Many electric utility companies have come to realize the Importance of seeking public input before launching corporate resources into major construction projects. One way to organize this input is to establish a Citizen Advisory Council (CAC). This paper describes the purpose of such a group, its advantages and limitations, and how it might be organized. This paper also describes the results of a survey of CAC use for facility siting purposes. Fifty large utility companies were contacted, eleven of which use CACs for siting purposes. Six of these were questioned in greater detail as to their success in using CACs on specific projects. All companies were positive about the use of CACs for public participation because the groups were able to bring valuable information to light and company credibility was enhanced. Most importantly, the responding companies believed they were able to save time in the siting and licensing process

  14. Financial statistics of major US publicly owned electric utilities 1994

    International Nuclear Information System (INIS)

    1995-01-01

    This publication presents 5 years (1990--94) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. Generator and nongenerator summaries are presented. Composite tables present: Aggregates of income statement and balance sheet data, financial indicators, electric operation and maintenance expenses, electric utility plant, number of consumers, sales of electricity, and operating revenue, and electric energy account data

  15. Financial statistics of major US publicly owned electric utilities 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-15

    This publication presents 5 years (1990--94) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. Generator and nongenerator summaries are presented. Composite tables present: Aggregates of income statement and balance sheet data, financial indicators, electric operation and maintenance expenses, electric utility plant, number of consumers, sales of electricity, and operating revenue, and electric energy account data.

  16. Utilization Of Information And Communication Technology Facilities ...

    African Journals Online (AJOL)

    The purpose of this study was to investigate the types of ICT facilities used for the provision of library and information services in Nigerian University libraries. It was also set to determine if there is any significant difference between Southern and Northern Nigeria University libraries of the first, second and third generations in ...

  17. 10 CFR 490.307 - Option for Electric Utilities.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Option for Electric Utilities. 490.307 Section 490.307... Provider Vehicle Acquisition Mandate § 490.307 Option for Electric Utilities. (a) A covered person or its... selling, at wholesale or retail, electricity has the option of delaying the vehicle acquisition mandate...

  18. Electric vehicles from the point of view of an energy utility; Elektrofahrzeuge aus Sicht eines Energieversorgers

    Energy Technology Data Exchange (ETDEWEB)

    Corpataux, M.

    2008-07-01

    This presentation made at the Swiss 2008 research conference on traffic by Marcel Corpataux from the Elektra Baselland utility (EBL) takes a look at the utility's activities in the renewable energies sector and the need for balancing energy supply and demand. Various methods on the demand side are briefly looked at and the use of 'vehicle-to-grid' concepts that use hybrid vehicles as storage facilities for electrical power are commented on. The chances offered to electricity utilities by using hybrid vehicles as buffer storage for electrical power are discussed.

  19. Post irradiation examinations cooperation and worldwide utilization of facilities

    International Nuclear Information System (INIS)

    Karlsson, Mikael

    2009-01-01

    Status of post irradiation examinations in Studsvik's facilities, cooperation and worldwide utilization of facilities, was described. Studsvik cooperate with irradiation facilities, as Halden, CEA and JAEA, as well as other hot cell facilities (examples, PSI, ITU and NFD) universities (example, the Royal Institute of Technology in Sweden) in order to be able to provide everything asked for by the nuclear community. Worldwide cooperation for effective use of expensive and highly specialized facilities is important, and the necessity of cooperation will be more and more recognized in the future. (author)

  20. Lewis Research Center space station electric power system test facilities

    Science.gov (United States)

    Birchenough, Arthur G.; Martin, Donald F.

    1988-01-01

    NASA Lewis Research Center facilities were developed to support testing of the Space Station Electric Power System. The capabilities and plans for these facilities are described. The three facilities which are required in the Phase C/D testing, the Power Systems Facility, the Space Power Facility, and the EPS Simulation Lab, are described in detail. The responsibilities of NASA Lewis and outside groups in conducting tests are also discussed.

  1. Demand-controlling marketing of electric utilities

    Energy Technology Data Exchange (ETDEWEB)

    Raffee, H; Fritz, W

    1980-01-01

    In situations like the shortage of energy resources the particular autonomy of the users concerning energy demand raises more and more aggravating problems for the electric utilities (EU) and, last not least, for society (i.e. the peak-load problem, threatening bottlenecks in the supply situation). Thus the requirement for a demand-controlling marketing strategy of the EU with the help of which the individual demand should be influenced in the following manner is legitimate. The article discusses the targets, strategies, and instruments of marketing performed by the EU under the aspect of their efficiency concerning demand control. The discussion leads to e.g. the following results: that a marketing strategy for the sensible, responsible, and efficent use of energy, in the long-term, serves both the interests of the users and the interests of the EU; that such a marketing programme can have the required controlling effects especially with the help of strategies like market segmentation and cooperation. The discussion makes also clear that a demand-controlling marketing strategy of the EU can hardly be realized without a considerable change within the organization of the EU on one hand and, on the other, without expanding the marketing programme toward a marketing strategy of balance.

  2. Financial statistics of selected investor-owned electric utilities, 1989

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    The Financial Statistics of Selected Investor-Owned Electric Utilities publication presents summary and detailed financial accounting data on the investor-owned electric utilities. The objective of the publication is to provide the Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decisionmaking purposes related to investor-owned electric utility issues.

  3. The HART I augmented electric gun facility

    International Nuclear Information System (INIS)

    Fikse, D.A.; Ciesar, J.A.; Wehrli, H.A.; Rimersma, H.; Docherty, E.F.; Pipich, C.W.

    1991-01-01

    This paper reports on an augmented electric gun system that has been commissioned. This system, called HART I (Hypervelocity Augmented Railgun Test), is built around a double augmented rail arrangement with a 1.27-cm square bore. It is powered by the SUVAC II 5.6-MJ distributed capacitor power supply. This arrangement allows operation in a simple, series augmented, or transaugmented gun system configuration. The objective of this facility is to perform materials research augmentation studies, and armature development in the 10-km/s regime. Armature masses of 2 to 4 g will be accelerated in a 4-m long barrel. Baseline bore materials will begin with conventional G9/GlidCop systems and then move into pyrolytic boron nitride/refractory materials. Hybrids, plasma, and ablation stabilized armature systems are planned. The gun system is instrumented with plasma and rail B probes for inbore velocity measurements. In addition, breech and muzzle voltages, currents, and external velocities are measured. The HART I system is currently performing hypervelocity experiments to verify the augmentation models

  4. Financial statistics of major US publicly owned electric utilities 1993

    Energy Technology Data Exchange (ETDEWEB)

    1995-02-01

    The 1993 edition of the Financial Statistics of Major U.S. Publicly Owned Electric Utilities publication presents five years (1989 to 1993) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decision making purposes related to publicly owned electric utility issues. Generator and nongenerator summaries are presented in this publication. The primary source of publicly owned financial data is the Form EIA-412, the Annual Report of Public Electric Utilities, filed on a fiscal basis.

  5. Electric Utility Transmission and Distribution Line Engineering Program

    Energy Technology Data Exchange (ETDEWEB)

    Peter McKenny

    2010-08-31

    working professionals wishing to update their skills or increase their knowledge of utility engineering design practices and procedures. By providing graduate educational opportunities for the above groups, the T&D Program will help serve a strong industry need for training the next generation of engineers in the cost-effective design, construction, operation, and maintenance of modern electrical transmission and distribution systems. In addition to developing the on-line engineering courses described above, the T&D Program also focused significant efforts towards enhancing the training opportunities available to power system operators in the northwest. These efforts have included working with outside vendors to provide NERC-approved training courses in Gonzaga University's (GU) system operator training facility, support for an accurate system model which can be used in regional blackstart exercises, and the identification of a retired system operator who could provide actual regional training courses. The GU system operator training facility is also being used to recruit young workers, veterans, and various under-represented groups to the utility industry. Over the past three years students from Columbia Gorge Community College, Spokane Falls Community College, Walla Walla Community College, Central Washington University, Eastern Washington University, Gonzaga University, and various local high schools have attended short (one-day) system operator training courses free of charge. These collaboration efforts has been extremely well received by both students and industry, and meet T&D Program objectives of strengthening the power industry workforce while bridging the knowledge base across power worker categories, and recruiting new workers to replace a predominantly retirement age workforce. In the past three years the T&D Program has provided over 170 utility engineers with access to advanced engineering courses, been involved in training more than 300 power system

  6. Practical uses of galvanized steel in electric utility applications

    International Nuclear Information System (INIS)

    Bueche, D.G.

    1995-01-01

    Steel corrosion has been shown to be a major problem for the electric utility industry. Galvanizing has been shown to prevent or substantially slow steel corrosion. This paper describes the galvanizing process, discusses the properties associated with the galvanized coating, and demonstrates galvanizing's durability in specific, real world applications in the electric utility industry

  7. STG-ET: DLR electric propulsion test facility

    Directory of Open Access Journals (Sweden)

    Andreas Neumann

    2017-04-01

    Full Text Available DLR operates the High Vacuum Plume Test Facility Göttingen – Electric Thrusters (STG-ET. This electric propulsion test facility has now accumulated several years of EP-thruster testing experience. Special features tailored to electric space propulsion testing like a large vacuum chamber mounted on a low vibration foundation, a beam dump target with low sputtering, and a performant pumping system characterize this facility. The vacuum chamber is 12.2m long and has a diameter of 5m. With respect to accurate thruster testing, the design focus is on accurate thrust measurement, plume diagnostics, and plume interaction with spacecraft components. Electric propulsion thrusters have to run for thousands of hours, and with this the facility is prepared for long-term experiments. This paper gives an overview of the facility, and shows some details of the vacuum chamber, pumping system, diagnostics, and experiences with these components.

  8. Transformers and the Electric Utility System

    Science.gov (United States)

    Roman, Harry T.

    2005-01-01

    For electric energy to get from the generating station to a home, it must pass through a transformer, a device that can change voltage levels easily. This article describes how transformers work, covering the following topics: (1) the magnetism-electricity link; (2) transformer basics; (3) the energy seesaw; (4) the turns ratio rule; and (5)…

  9. Cost and quality of fuels for electric utility plants, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-14

    This document presents an annual summary of statistics at the national, Census division, State, electric utility, and plant levels regarding the quantity, quality, and cost of fossil fuels used to produce electricity. Purpose of this publication is to provide energy decision-makers with accurate, timely information that may be used in forming various perspectives on issues regarding electric power.

  10. R and D options for demand side management in Japanese electric utilities

    International Nuclear Information System (INIS)

    Yamamoto, Takahiko

    1996-01-01

    Japanese electric demand has been steadily increasing in accordance with the economic growth. However, Japanese electric utilities are facing several problems; increasing construction cost of power facilities, siting constraints and the environmental issue of greenhouse gas emissions. To overcome these problems, electric utilities have been promoting demand-side-management (DSM) activities as well as supplier-side measures, with some presently being carried out through promoting energy conservation technologies and introducing electric tariff options of specific contracts for residential/commercial and industrial consumers. Japanese electric utilities have been carrying out R and D for the future, in particular, energy storage and heat storage which contribute to the improvement of load factor. In this paper, I would like to outline the R and D options for DSM in Japan. (author)

  11. The role of utilities in developing low carbon, electric megacities

    International Nuclear Information System (INIS)

    Kennedy, Chris; Stewart, Iain D.; Facchini, Angelo; Mele, Renata

    2017-01-01

    Development of electric cities, with low carbon power supply, is a key strategy for reducing global CO2 emissions. We analyze the role of electric utilities as important actors to catalyze the transition to electric cites, drawing upon data for the world's 27 megacities. Progress towards the ideal electric city is most advanced for Paris, Rio de Janeiro, Sao Paulo and Buenos Aires for low carbon electricity, while Indian megacities have relatively high use of carbon-intensive electricity as a percentage of total energy use. There is wide variety in the structure of markets for electricity provision in megacities, with a dominant, public utility being the most common model. We review literature on electricity sector business models and broadly propose future models dependent on the predominance of locally dispersed generation and the nature of the ownership of the electric grid within the city. Where a high proportion of electricity can be provided by locally distributed supply within a city, the role of utilities could predominantly become that of enabler of exchange with the grid, but new pricing structures are required. A further challenge for utilities in enabling the electric city is to provide a higher level of resilience to events that disrupt power supply. - Highlights: • Amongst 27 megacities, Paris, Rio, Sao Paulo and Buenos Aires are most progressed low carbon electric cities. • Indian megacities have relatively high use of electricity as a percentage of total energy use. • Wide variety in electricity market structure in megacities; dominant, public utility the most common model. • Utilities could become enablers of exchange with the grid, but new pricing models required.

  12. Electrical, Magnetic, and Optical Measurement Facility

    Data.gov (United States)

    Federal Laboratory Consortium — FUNCTION: Provides tools necessary for electrical, magnetic, and optical characterization of bulk and thin-film materials. This includes the ability to determine the...

  13. Dynamic Response Testing in an Electrically Heated Reactor Test Facility

    Science.gov (United States)

    Bragg-Sitton, Shannon M.; Morton, T. J.

    2006-01-01

    Non-nuclear testing can be a valuable tool in development of a space nuclear power or propulsion system. In a non-nuclear test bed, electric heaters are used to simulate the heat from nuclear fuel. Standard testing allows one to fully assess thermal, heat transfer, and stress related attributes of a given system, but fails to demonstrate the dynamic response that would be present in an integrated, fueled reactor system. The integration of thermal hydraulic hardware tests with simulated neutronic response provides a bridge between electrically heated testing and full nuclear testing. By implementing a neutronic response model to simulate the dynamic response that would be expected in a fueled reactor system, one can better understand system integration issues, characterize integrated system response times and response characteristics, and assess potential design improvements at a relatively small fiscal investment. Initial system dynamic response testing was demonstrated on the integrated SAFE-100a heat pipe cooled, electrically heated reactor and heat exchanger hardware, utilizing a one-group solution to the point kinetics equations to simulate the expected neutronic response of the system (Bragg-Sitton, 2005). The current paper applies the same testing methodology to a direct drive gas cooled reactor system, demonstrating the applicability of the testing methodology to any reactor type and demonstrating the variation in system response characteristics in different reactor concepts. In each testing application, core power transients were controlled by a point kinetics model with reactivity feedback based on core average temperature; the neutron generation time and the temperature feedback coefficient are provided as model inputs. Although both system designs utilize a fast spectrum reactor, the method of cooling the reactor differs significantly, leading to a variable system response that can be demonstrated and assessed in a non-nuclear test facility.

  14. Physics Detector Simulation Facility (PDSF) architecture/utilization

    International Nuclear Information System (INIS)

    Scipioni, B.

    1993-05-01

    The current systems architecture for the SSCL's Physics Detector Simulation Facility (PDSF) is presented. Systems analysis data is presented and discussed. In particular, these data disclose the effectiveness of utilization of the facility for meeting the needs of physics computing, especially as concerns parallel architecture and processing. Detailed design plans for the highly networked, symmetric, parallel, UNIX workstation-based facility are given and discussed in light of the design philosophy. Included are network, CPU, disk, router, concentrator, tape, user and job capacities and throughput

  15. State Regulatory responses to acid rain: Implications for electric utility operations

    International Nuclear Information System (INIS)

    Nagelhout, M.

    1990-01-01

    This article discusses the state regulatory responses to acid rain legislation and how this will affect electric utility operations. Topics discusses include planning and fuel procurement practices, least-cost planning, long-term supply contracts, fuel mix, cogeneration and small power production, qualifying facility contracts, avoided costs, environmental impact, lobbying expense, bill inserts, and forecasting models

  16. U.S. electric utility demand-side management 1995

    International Nuclear Information System (INIS)

    1997-01-01

    The US Electric Utility Demand-Side Management report is prepared by the Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternative Fuels; Energy Information Administration (EIA); US Department of Energy. The report presents comprehensive information on electric power industry demand-side management (DSM) activities in the US at the national, regional, and utility levels. The objective of the publication is to provide industry decision makers, government policy makers, analysts, and the general public with historical data that may be used in understanding DSM as it relates to the US electric power industry. The first chapter, ''Profile: US Electric Utility Demand-Side Management'', presents a general discussion of DSM, its history, current issues, and a review of key statistics for the year. Subsequent chapters present discussions and more detailed data on energy savings, peak load reductions and costs attributable to DSM. 9 figs., 24 tabs

  17. Growth strategies of electric utilities in context of deregulation and liberalization of electricity market

    Directory of Open Access Journals (Sweden)

    Maria Đogić

    2017-01-01

    Full Text Available This paper identifies the growth strategies adopted by the electric utilities sector in the context of changes resulting from the deregulation and liberalization of the electricity market. Strategies pursued by the electric utilities sector were rarely the subject of research in the field of strategic management despite the fact that electricity is an indispensable element of everyday life and the economy as a whole. Therefore, a case study of the largest incumbent electric utilities in the Republic of Croatia, Slovenia, Bosnia and Herzegovina, Serbia, Montenegro, and Macedonia has been conducted, and differences in the degree of market liberalization and core features of these companies have been noted. Research findings have shown that the degree of deregulation can affect the growth strategies of electric utilities. In those countries where the degree of deregulation is lower, electric utilities focus on the domestic market. On the other hand, a higher level of deregulation enables electric utilities to achieve their growth through diversification or innovation. Given the fact that the analyzed electric utilities are operating within relatively small economies, they cannot compete with electric utilities in developed countries, and, apart from international electricity trading, are mostly focused on their domestic markets.

  18. Managing the GPS/GIS function in an electric utility

    International Nuclear Information System (INIS)

    Michelsen, M.W. Jr.

    1999-01-01

    A new period of higher significance has arrived for the GPS/GIS function at electric utilities such that to a degree never seen before, utility managers are looking to their GIS programs, filled with increasingly accurate data collected by GPS technology, before making many decisions. With this capability comes an expectation for GPS/GIS professionals to provide higher levels of planning and management of their data collection process. At Duke Power in Charlotte, North Carolina, managers rely on GPS mapping to fill their data collection equipment needs. When the city of Charlotte requested a more detailed billing system, Duke Power co-sponsored the street lighting inventory project, a comprehensive program implemented to fully account for street lighting facilities within the billing area. One of the key projects to be kept in mind was the creation of a common data base viewable by GIS from which a bill could be created and as well reveal data. A billing calculation routine can be run against the data base to generate a bill or use MapInfo to see a graphical picture. Prior to the creation of this data base capability, the difference between the data base as a display tool and billing system was a potential source of discrepancy, which is eliminated now. Creating the data base allows more than just creating a bill for the city, it allows Duke Power to work better with the city by improving its billing accountability and provides better service as well

  19. New England electric utility takes the lead

    Energy Technology Data Exchange (ETDEWEB)

    New England Electric System has taken several steps to reduce dependence on foreign oil, save its customers money, and encourage the development of energy resources tailored to meet the region's energy needs. The heart of the plan is a stated objective of reducing annual peaking demand for electrical growth from a projected 3.1% to 1.9%. Other activities initiated are: a solar hot water demonstration project; the NEPCO's burning of a mixture of pulverized coal and residual fuel oil in one of its boilers at Salem Harbor Station in Salem, Massachusetts; purchasing and trading electricity with industrial and private small power producers; and participating in an effort to develop a plan to convert the Brayton Point power plant in Somerset, Massachusetts from oil to coal.

  20. Electrolysis: Information and Opportunities for Electric Power Utilities

    Energy Technology Data Exchange (ETDEWEB)

    Kroposki, B.; Levene, J.; Harrison, K.; Sen, P.K.; Novachek, F.

    2006-09-01

    Recent advancements in hydrogen technologies and renewable energy applications show promise for economical near- to mid-term conversion to a hydrogen-based economy. As the use of hydrogen for the electric utility and transportation sectors of the U.S. economy unfolds, electric power utilities need to understand the potential benefits and impacts. This report provides a historical perspective of hydrogen, discusses the process of electrolysis for hydrogen production (especially from solar and wind technologies), and describes the opportunities for electric power utilities.

  1. Outline of electric power facility plan in fiscal year 1988

    International Nuclear Information System (INIS)

    1988-01-01

    As to the electric power facility plan in fiscal year 1988, 15 designated electric power enterprises made the notification to the Minister of International Trade and Industry in March, 1988. This outline of the facility plan summarized the plans of 66 enterprises in total, including the plans of municipally operated, joint thermal power and other enterprises in addition to the above 15. In order to ensure the stable supply of electric power, the Ministry of International Trade and Industry considers that it is indispensable to purposefully develop electric power sources and the facilities for distribution along this facility plan. The forecast for fiscal year 1997 is : total electric power demand 778.2 billion kWh, maximum power demand 151.21 million kW, and yearly load factor 56.9 %. This is equivalent to the yearly growth of 2.4 %. In fiscal year 1988, it is planned to present 29 plants of 2760 MW to the Power Source Development Coordination Council. The breakdown is : hydroelectricity 140 MW, thermal power 2010 MW, and nuclear power 610 MW. The Ministry guides electric power enterprises so as to realize the diversification of electric power sources. Also the increase of transmission and transformation facilities, the plan of equipment investment and others are reported. (Kako, I.)

  2. prevalence and correlates of utilization of health facilities in ...

    African Journals Online (AJOL)

    Musumali

    2007-10-11

    Oct 11, 2007 ... of the expectant women did not deliver at a health facility ... health service utilization for childbirth such as education5-8, maternal age 3,6, parity6,8, economic status7, cultural factors and beliefs, lack of skilled staff at primary.

  3. Financial statistics of major US publicly owned electric utilities 1992

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The 1992 edition of the Financial Statistics of Major US Publicly Owned Electric Utilities publication presents 4 years (1989 through 1992) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decisionmaking purposes related to publicly owned electric utility issues. Generator and nongenerator summaries are presented in this publication. Four years of summary financial data are provided. Summaries of generators for fiscal years ending June 30 and December 31, nongenerators for fiscal years ending June 30 and December 31, and summaries of all respondents are provided. The composite tables present aggregates of income statement and balance sheet data, as well as financial indicators. Composite tables also display electric operation and maintenance expenses, electric utility plant, number of consumers, sales of electricity, and operating revenue, and electric energy account data. The primary source of publicly owned financial data is the Form EIA-412, {open_quotes}Annual Report of Public Electric Utilities.{close_quotes} Public electric utilities file this survey on a fiscal year, rather than a calendar year basis, in conformance with their recordkeeping practices. In previous editions of this publication, data were aggregated by the two most commonly reported fiscal years, June 30 and December 31. This omitted approximately 20 percent of the respondents who operate on fiscal years ending in other months. Accordingly, the EIA undertook a review of the Form EIA-412 submissions to determine if alternative classifications of publicly owned electric utilities would permit the inclusion of all respondents.

  4. Superconducting magnetic energy storage for electric utilities and fusion systems

    International Nuclear Information System (INIS)

    Rogers, J.D.; Boenig, H.J.; Hassenzahl, W.V.

    1978-01-01

    Superconducting inductors provide a compact and efficient means of storing electrical energy without an intermediate conversion process. Energy storage inductors are under development for load leveling and transmission line stabilization in electric utility systems and for driving magnetic confinement and plasma heating coils in fusion energy systems. Fluctuating electric power demands force the electric utility industry to have more installed generating capacity than the average load requires. Energy storage can increase the utilization of base-load fossil and nuclear power plants for electric utilities. The Los Alamos Scientific Laboratory and the University of Wisconsin are developing superconducting magnetic energy storage (SMES) systems, which will store and deliver electrical energy for load leveling, peak shaving, and the stabilization of electric utility networks. In the fusion area, inductive energy transfer and storage is being developed. Both 1-ms fast-discharge theta-pinch systems and 1-to-2-s slow energy transfer tokamak systems have been demonstrated. The major components and the method of operation of a SMES unit are described, and potential applications of different size SMES systems in electric power grids are presented. Results are given of a reference design for a 10-GWh unit for load leveling, of a 30-MJ coil proposed for system stabilization, and of tests with a small-scale, 100-kJ magnetic energy storage system. The results of the fusion energy storage and transfer tests are presented. The common technology base for the various storage systems is discussed

  5. Electric utility preferred stock financing - twilight or new dawn?

    International Nuclear Information System (INIS)

    Klein, R.

    1991-01-01

    The tax laws have greatly diminished the importance of utility preferred stock. But with utility construction programs expected to rise, it is an opportune time to see if preferreds can be an attractive option again. As recently as 1980, preferred stock financing by electric utilities comprised 55% of all U.S. corporate preferred stock issued. By 1989, this percentage had declined to under 12%. In dollar amounts, electric utility preferred stock financing had decreased by two-thirds over the same time period. The author analyzes just why this decline occurred and what it portends for the future

  6. Network governance in electricity distribution: Public utility or commodity

    International Nuclear Information System (INIS)

    Kuenneke, Rolf; Fens, Theo

    2005-01-01

    This paper addresses the question whether the operation and management of electricity distribution networks in a liberalized market environment evolves into a market driven commodity business or might be perceived as a genuine public utility task. A framework is developed to classify and compare different institutional arrangements according to the public utility model and the commodity model. These models are exemplified for the case of the Dutch electricity sector. It appears that the institutional organization of electricity distribution networks is at the crossroads of two very different institutional development paths. They develop towards commercial business if the system characteristics of the electricity sector remain basically unchanged to the traditional situation. If however innovative technological developments allow for a decentralization and decomposition of the electricity system, distribution networks might be operated as public utilities while other energy services are exploited commercially. (Author)

  7. Utility service quality - telecommincations, electricity, water

    Energy Technology Data Exchange (ETDEWEB)

    Holt, L. [Florida Univ., Gainesville, FL (United States). Public Utility Research Center

    2005-09-01

    This survey of quality-of-service issues raised by regulation identifies 12 steps for promoting efficient sector performance. First, regulators must identify objectives and prioritize them. Inter-agency coordination is often required to establish targets. Regulators must also determine a process for selecting measures and an appropriate method for evaluating them. Finally, performance incentives must be established and outcomes periodically reviewed. Telecommunications, electricity, and water all have multiple dimensions of quality that warrant careful attention. (Author)

  8. Electricity utility deregulation in Great Britain: economic and industrial consequences

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    In this paper we analyze in the first part how was made the deregulation of the public electric utilities in Great Britain and in the second the logic and the contradictions of this deregulation in an industrial point of view

  9. Opportunities for electric utilities in telecommunications

    International Nuclear Information System (INIS)

    Meehan, C.M.

    1994-01-01

    This article examines the opportunities for utility participation in the telecommunications market on private microwave systems and hybrid microwave and fiber systems. The topics of the article include entering the market, national information infrastructure, business opportunities and considerations, levels of participation in telecommunications market, and regulatory objectives

  10. Japanese electric utilities call for IPP capacity

    Energy Technology Data Exchange (ETDEWEB)

    Jeffs, E.

    1997-03-01

    Japan`s ten power utilities have finally grasped the nettle, and called in IPPs to supply at least 3 GW of new capacity in each of the next ten years. The first twenty schemes awarded last year are all based on existing industrial energy producers, and consist mainly of coal- or oil-fired plants of 150 MW or less. 1 tab.

  11. The electric utilities during the 1970s and 1980s

    International Nuclear Information System (INIS)

    Studness, C.M.

    1990-01-01

    This article reviews the financial performance of electric utilities during the 1970s and 1980s and the factors which have affected their performance. Topics include the effects of the energy crisis in 1973, the nuclear accident at Three Mile Island in 1979, the widespread use of imprudence disallowances by regulators after 1984, and the gradual extension of the nation's deregulation movement to the electric utilities

  12. Electric-utility DSM programs in a competitive market

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E.

    1994-04-01

    During the past few years, the costs and effects of utility demand-side management (DSM) programs have grown sharply. In 1989, US electric utilities spent 0.5% of revenues on such programs and cut total electricity consumption by 0.6%. By 1992, these numbers had increased to 1.3% and 1.2%, respectively. Utility projections, as of early 1993, of DSM expenditures and energy savings for 1997 were 1.7% and 2.5%, respectively. Whether this projected growth comes to pass may depend on current debates about deregulation of, and increased competition in, the electric-utility industry. This report examines the factors likely to affect utility DSM programs in a more competitive environment. The electric-utility industry faces two forces that may conflict with each other. One is the pressure to open up both wholesale and retail markets for competition. The net effect of such competition, especially at the retail level, would have much greater emphasis on electricity prices and less emphasis on energy services. Such an outcome would force a sharp reduction in the scale of DSM programs that are funded by customers in general. The second force is increased concern about environmental quality and global warming. Because utilities are major contributors to US carbon dioxide emissions, the Administration`s Climate Change Action Plan calls on utilities to reduce such emissions. DSM programs are one key way to do that and, in the process, to cut customer electric bills and improve economic productivity. This report discusses the forms of competition and how they might affect DSM programs. It examines the important roles that state regulatory commissions could play to affect retail competition and utility DSM programs. The report also considers the effects of DSM programs on retail electricity prices.

  13. Survey of current electric utility research in Canada

    International Nuclear Information System (INIS)

    1979-11-01

    Information on the research programs of eight Canadian electrical utilities and the Canadian Electrical Association has been compiled. Work done by the National Research Council of Canada is included, but the research done by Atomic Energy of Canada Ltd. is excluded. Projects in the area of nuclear power include work on heat transfer and fluid flow, waste management, materials, and corrosion. (L.L.)

  14. Development of the electric utility dispersed use PAFC stack

    Energy Technology Data Exchange (ETDEWEB)

    Horiuchi, Hiroshi; Kotani, Ikuo [Mitsubishi Electric Co., Kobe (Japan); Morotomi, Isamu [Kansai Electric Power Co., Hyogo (Japan)] [and others

    1996-12-31

    Kansai Electric Power Co. and Mitsubishi Electric Co. have been developing the electric utility dispersed use PAFC stack operated under the ambient pressure. The new cell design have been developed, so that the large scale cell (1 m{sup 2} size) was adopted for the stack. To confirm the performance and the stability of the 1 m{sup 2} scale cell design, the short stack study had been performed.

  15. Perspectives on the future of the electric utility industry

    Energy Technology Data Exchange (ETDEWEB)

    Tonn, B. [Oak Ridge National Lab., TN (United States); Schaffhauser, A. [Tennessee Univ., Knoxville, TN (United States)

    1994-04-01

    This report offers perspectives on the future of the electric utility industry. These perspectives will be used in further research to assess the prospects for Integrated Resource Planning (IRP). The perspectives are developed first by examining economic, political and regulatory, societal, technological, and environmental trends that are (1) national and global in scope and (2) directly related to the electric utility industry. Major national and global trends include increasing global economic competition, increasing political and ethnic strife, rapidly changing technologies, and increasing worldwide concern about the environment. Major trends in the utility industry include increasing competition in generation; changing patterns of electricity demand; increasing use of information technology to control power systems; and increasing implementation of environmental controls. Ways in which the national and global trends may directly affect the utility industry are also explored. The trends are used to construct three global and national scenarios- ``business as usual,`` ``technotopia future,`` and ``fortress state`` -and three electric utility scenarios- ``frozen in headlights,`` ``megaelectric,`` and ``discomania.`` The scenarios are designed to be thought provoking descriptions of potential futures, not predictions of the future, although three key variables are identified that will have significant impacts on which future evolves-global climate change, utility technologies, and competition. While emphasis needs to be placed on understanding the electric utility scenarios, the interactions between the two sets of scenarios is also of interest.

  16. Perspectives on the future of the electric utility industry

    International Nuclear Information System (INIS)

    Tonn, B.; Schaffhauser, A.

    1994-04-01

    This report offers perspectives on the future of the electric utility industry. These perspectives will be used in further research to assess the prospects for Integrated Resource Planning (IRP). The perspectives are developed first by examining economic, political and regulatory, societal, technological, and environmental trends that are (1) national and global in scope and (2) directly related to the electric utility industry. Major national and global trends include increasing global economic competition, increasing political and ethnic strife, rapidly changing technologies, and increasing worldwide concern about the environment. Major trends in the utility industry include increasing competition in generation; changing patterns of electricity demand; increasing use of information technology to control power systems; and increasing implementation of environmental controls. Ways in which the national and global trends may directly affect the utility industry are also explored. The trends are used to construct three global and national scenarios- ''business as usual,'' ''technotopia future,'' and ''fortress state'' -and three electric utility scenarios- ''frozen in headlights,'' ''megaelectric,'' and ''discomania.'' The scenarios are designed to be thought provoking descriptions of potential futures, not predictions of the future, although three key variables are identified that will have significant impacts on which future evolves-global climate change, utility technologies, and competition. While emphasis needs to be placed on understanding the electric utility scenarios, the interactions between the two sets of scenarios is also of interest

  17. R and D options for demand side management in Japanese electric utilities

    International Nuclear Information System (INIS)

    Yamamoto, T.

    1995-01-01

    Japanese electric utilities are facing several problems: increasing construction cost of power facilities, siting constraints and the environmental issue of greenhouse gas emissions. To overcome these problems, electric utilities have been promoting demand-side-management (DSM) activities as well as supplier-side measures, with some presently being carried out through promoting energy conservation technologies and introducing tariff options for residential/commercial and industrial consumers. R and D works have been carried out on various fields such as energy storage and heat storage which contribute to the improvement of the load factor. 5 figs., 2 tabs

  18. Financial statistics major US publicly owned electric utilities 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The 1996 edition of The Financial Statistics of Major US Publicly Owned Electric Utilities publication presents 5 years (1992 through 1996) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decision making purposes related to publicly owned electric utility issues. Generator and nongenerator summaries are presented in this publication. Five years of summary financial data are provided. Summaries of generators for fiscal years ending June 30 and December 31, nongenerators for fiscal years ending June 30 and December 31, and summaries of all respondents are provided. The composite tables present aggregates of income statement and balance sheet data, as well as financial indicators. Composite tables also display electric operation and maintenance expenses, electric utility plant, number of consumers, sales of electricity, and operating revenue, and electric energy account data. 2 figs., 32 tabs.

  19. Savannah River Site: Canyons and associated facilities utilization study

    International Nuclear Information System (INIS)

    Ellison, D.; Dickenson, J.

    1995-01-01

    The Westinghouse Savannah River Company was asked by the U.S. Department of Energy (DOE) to study options for utilization of Savannah River Site (SRS) Canyons and Associated Facilities to support existing and potential future material stabilization and/or disposition missions. This report is WSRC's response to that request. It includes: (1) A compilation of pending DOE material stabilization and/or disposition decisions involving utilization of SRS canyons and associated facilities, including discussion of quantities and expected availability of materials for which SRS handling and/or processing capability is a reasonable alternative under consideration. (2) A description of SRS canyons and associated facilities affected by pending DOE material stabilization and/or disposition decisions, including discussion of material handling and/or processing capabilities and capacities. (3) A comparative evaluation of three proposed scenarios for SRS canyon utilization with respect to startup and operating schedules; annual and life cycle costs; impacts on completion of commitments in the DOE Implementation Plan (IP) for Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1; SRS ability to support alternatives under consideration in pending DOE materials stabilization and/or disposition decisions; and timing for potential transition to deactivation. (4) The sensitivity of the comparative evaluation of the three canyon utilization scenarios to the effect of the selection of other alternatives for individual stabilization missions or individual new missions. Briefings on the scope of this study have been presented to key representatives of several SRS public stakeholder groups. Briefings on the major conclusions from this study have been presented to WSRC Management, DOE-SR, EM-60, EM-1, and the DNFSB

  20. DSM and electric utility competitiveness: An Illinois perspective

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, P.W.

    1994-12-31

    A predominant theme in the current electric utility industry literature is that competitive forces have emerged and may become more prominent. The wholesale bulk power market is alreadly competitive, as non-utility energy service providers already have had a significant impact on that market; this trend was accelerated by the Energy Policy Act of 1992. Although competition at the retail level is much less pervasive, electric utility customers increasingly have greater choice in selecting energy services. These choices may include, depending on the customer, the ability to self-generate, switch fuels, move to a new location, or rely more heavily on demand-side management as a means of controlling electric energy use. This paper explores the subject of how demand-side management (DSM) programs, which are often developed by a utility to satisfy resource requirements as a part of its least-cost planning process, can affect the utility`s ability to compete in the energy services marketplace. In this context, the term `DSM` is used in this paper to refer to those demand-side services and programs which provide resources to the utility`s system. Depending on one`s perspective, DSM programs (so defined) can be viewed either as an enhancement to the competitive position of a utility by enabling it to provide its customers with a broader menu of energy services, simultaneously satisfying the objectives of the utility as well as those of the customers, or as a detractor to a utility`s ability to compete. In the latter case, the concern is with respect to the potential for adverse rate impacts on customers who are not participants in DSM programs. The paper consists of an identification of the pros and cons of DSM as a competitive strategy, the tradeoff which can occur between the cost impacts and rate impacts of DSM, and an examination of alternative strategies for maximizing the utilization of DSM both as a resource and as a competitive strategy.

  1. Aiming for market leadership - from electricity utility to pellets manufacturer; Die Marktfuehrerschaft im Visier

    Energy Technology Data Exchange (ETDEWEB)

    Aeberli, O. E.

    2003-07-01

    This short article describes the plans of a small Swiss electricity utility to break out of its traditional role in power generation and the distribution of electricity and go into the production of wood pellets. The pellets, which are to be made from waste wood available from a wood processing facility in the utility's own region, are to be produced on a scale which can be described as being quite large for Switzerland. The article discusses this unusual approach for a Swiss power utility, which also operates a wood-fired power station and has diversified into other areas such as electrical house installations and overland power lines. The markets being aimed for are described, including modern low-energy-consumption housing projects.

  2. Electrical energy and cost for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Pence, G.A.

    1983-01-01

    An operational scenario has been developed for the Mirror Fusion Test Facility (MFTF-B) based on the System Requirements, our experience with existing systems, and discussions with the project engineers and designers who are responsible for the systems. This scenario was used to predict the amount of electrical energy needed for running the facility. A generic type listing is included for the equipment considered in each system

  3. Electrical energy and cost for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Pence, G.A.

    1983-02-01

    An operational scenario for the Mirror Fusion Test Facility has been developed based on System Requirements, experience with existing systems, and discussions with project engineers and designers who are responsible for the systems. This scenario was used to project the electrical energy required for the facility. Each system is listed showing the equipment that has been considered, the amount of power requested, and in most cases, the power that it is now connected

  4. Favourability towards electric utilities jumps 10 per cent in 1997

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    A recent survey of public opinion has shown that 85 per cent of the public view their electric utility company favourably. This represents a 10 per cent increase over last year. A survey of 4,090 Canadians was conducted which looked at the perceptions of the value of electricity services compared to telephone, natural gas, banking, and home insurance services. The study showed that Canadian electric utility companies are viewed as positively as the telephone companies and almost as favourably as the banks. Some 71 per cent of respondents reported that the value they receive from their electric utility is excellent or good. Lower prices, better customer services and increased research into alternative power sources were among the benefits that Canadians perceive would result from a more competitive electricity sector. Some misgivings about deregulation included a belief that there would be less attention to environmental concerns and more outages. Four per cent of the respondents said they would 'definitely' switch to an alternative supplier of electricity, while 25 per cent said they would 'probably' switch to an alternative supplier of electricity. 2 tabs

  5. Cost and quality of fuels for electric utility plants 1991

    International Nuclear Information System (INIS)

    1992-01-01

    Data for 1991 and 1990 receipts and costs for fossil fuels discussed in the Executive Summary are displayed in Tables ES1 through ES7. These data are for electric generating plants with a total steam-electric and combined-cycle nameplate capacity of 50 or more megawatts. Data presented in the Executive Summary on generation, consumption, and stocks of fossil fuels at electric utilities are based on data collected on the Energy Information Administration, Form EIA-759, ''Monthly Power Plant Report.'' These data cover all electric generating plants. The average delivered cost of coal, petroleum, and gas each decreased in 1991 from 1990 levels. Overall, the average annual cost of fossil fuels delivered to electric utilities in 1991 was $1.60 per million Btu, a decrease of $0.09 per million Btu from 1990. This was the lowest average annual cost since 1978 and was the result of the abundant supply of coal, petroleum, and gas available to electric utilities. US net generation of electricity by all electric utilities in 1991 increased by less than I percent--the smallest increase since the decline that occurred in 1982.3 Coal and gas-fired steam net generation, each, decreased by less than I percent and petroleum-fired steam net generation by nearly 5 percent. Nuclear-powered net generation, however, increased by 6 percent. Fossil fuels accounted for 68 percent of all generation; nuclear, 22 percent; and hydroelectric, 10 percent. Sales of electricity to ultimate consumers in 1991 were 2 percent higher than during 1990

  6. Review of inter-utility trade in electricity

    International Nuclear Information System (INIS)

    1994-01-01

    In 1992, Canada's National Energy Board released two discussion papers on inter-utility trade. Responses to the papers were received from utilities, government agencies, and other interested parties with regard to questions concerning measures that could be taken to enhance interprovincial trade in electricity and to enable buyers and sellers of electricity to obtain commercial access to available transmission capacity through intermediate provinces for wheeling purposes. The Board's review had estimated long-term net benefits from enhanced inter-utility cooperation at $23-32.5 billion by the year 2000 from such types of transactions as seasonal diversity exchanges and long-term firm sales. Seven types of options to achieve enhanced inter-utility trade were identified. Most of the respondent utilities and provinces that have direct access to external markets tended to prefer the status quo, opposing mandated solutions but supporting (or at least not opposing) federal monitoring of progress on enhanced inter-utility cooperation. Provinces and utilities without direct access to external markets tended to support (as a last resort) mandated solutions to disputes concerning electricity trade. Since the Board review, important events in the North American electricity supply industry have occurred; these are described, focusing on the US Energy Policy Act that gives powers to order transmission access. The formation by US utilities of regional transmission groups (RTGs) with federal encouragement is discussed, along with the implications for Canadian utilities that may want to become members of particular RTGs. The advantages and drawbacks of selecting the various options for enhancing inter-utility trade are then summarized. 1 tab

  7. Investigation into the risk perceptions of investors in the securities of nuclear-dependent electric utilities

    International Nuclear Information System (INIS)

    Spudeck, R.E.

    1983-01-01

    Two weeks prior to the Three Mile Island accident, March 15, 1979, the Nuclear Regulatory Commission ordered five operating nuclear plants shut down in order to reexamine safety standards in these plants. Reports in the popular and trade press during this time suggested that these events, particularly the accident at Three Mile Island, caused investors in the securities of electric utilities that had nuclear-generation facilities to revise their risk perceptions. This study was designed to examine the impact of both the Nuclear Regulatory Commission order and the accident at Three Mile Island on investor risk perceptions. Selected categories of electric utilities were chosen to examine any differential risk effects resulting from these events. An asset pricing model devoid of many of the restrictive assumptions of more familiar models was used to model investor behavior. The findings suggest that the events described did cause investors to revise upward their perceptions of systematic risk regarding different categories of electric utilities. More specifically, those electric utilities that were operating nuclear plants in 1979 experienced the largest and most sustained increase in systematic risk. However, electric utilities that in 1979 had no operating nuclear plants, but had planned and committed funds for nuclear plants in the future, also experienced increases in systematic risk

  8. Electric utility resource expansion planning using environmental externalities

    International Nuclear Information System (INIS)

    Mitchell, D.

    1992-01-01

    This paper describes the recent experience of San Diego Gas ampersand Electric Company using environmental externalities in the expansion planning of its electrical system. This is the first time that this method of planning has been used in the electric utility industry in California. The paper reviews the conceptual development of the monetary values for environmental externalities and shows how the application of these values modifies the resource selection process. This paper should be of interest to professionals involved in policy issues relating to the use of environmental externalities as a means to improve the environment. The experience gained through this analyses should also benefit electric utility personnel involved in planning, and regulators interested in planning

  9. Activities of electric utilities in alternative energy projects

    International Nuclear Information System (INIS)

    Silva, D.B. da; Reis Neto, J.L. dos

    1990-01-01

    Since oil crisis, in 1973 and 1979, some electrical utilities in Brazil begun investments in alternative projects for example production of electrolytic hydrogen, peats with energetics goals, steam from electric boiler, and methanol from wood gasification. With oil substitution goals, these projects have not success actually, after attenuated the crisis. However, the results acquired is experience for the development of the brazilian energy patterns. (author)

  10. Managing an evolution: Deregulation of the electric utility industry

    Energy Technology Data Exchange (ETDEWEB)

    Skinner, S.K.

    1994-12-31

    The author discusses the emerging competitive situation in the electric power industry as deregulation of electric utilities looms on the horizon. The paper supports this change, and the competition it will bring, but urges caution as changes are instituted, and the regulatory bodies decide how and how much to free, and at what rates. The reason for his urge for caution comes from historical experience of other industries, which were smaller and had less direct impact on every American.

  11. Location of an electric source facility and local area promotion

    International Nuclear Information System (INIS)

    Shimohirao, Isao

    1999-01-01

    Here were described on energy demand and supply, energy policy and local area promotion policy for basic problems important on location of electric source facilities. At present, co-existence business between electricity business and electric source location area is lacking in its activity. It seems to be necessary to enforce some systems to intend to promote it earnestly, and to effort to promote industry promotions such as introduction of some national projects, induction of electricity cost reduction for a means of business invitation, and so forth. And it is necessary to promote them under cooperations with electricity businesses, governments, universities and communities for the industrial promotion and fixation of the youth at local areas. In order to realize such necessities, further larger efforts are expected for national and local governments. (G.K.)

  12. DSM and electric utility competitiveness: An Illinois perspective

    International Nuclear Information System (INIS)

    Jackson, P.W.

    1994-01-01

    A predominant theme in the current electric utility industry literature is that competitive forces have emerged and may become more prominent. The wholesale bulk power market is alreadly competitive, as non-utility energy service providers already have had a significant impact on that market; this trend was accelerated by the Energy Policy Act of 1992. Although competition at the retail level is much less pervasive, electric utility customers increasingly have greater choice in selecting energy services. These choices may include, depending on the customer, the ability to self-generate, switch fuels, move to a new location, or rely more heavily on demand-side management as a means of controlling electric energy use. This paper explores the subject of how demand-side management (DSM) programs, which are often developed by a utility to satisfy resource requirements as a part of its least-cost planning process, can affect the utility's ability to compete in the energy services marketplace. In this context, the term 'DSM' is used in this paper to refer to those demand-side services and programs which provide resources to the utility's system. Depending on one's perspective, DSM programs (so defined) can be viewed either as an enhancement to the competitive position of a utility by enabling it to provide its customers with a broader menu of energy services, simultaneously satisfying the objectives of the utility as well as those of the customers, or as a detractor to a utility's ability to compete. In the latter case, the concern is with respect to the potential for adverse rate impacts on customers who are not participants in DSM programs. The paper consists of an identification of the pros and cons of DSM as a competitive strategy, the tradeoff which can occur between the cost impacts and rate impacts of DSM, and an examination of alternative strategies for maximizing the utilization of DSM both as a resource and as a competitive strategy

  13. Cost analysis of energy storage systems for electric utility applications

    Energy Technology Data Exchange (ETDEWEB)

    Akhil, A. [Sandia National Lab., Albuquerque, NM (United States); Swaminathan, S.; Sen, R.K. [R.K. Sen & Associates, Inc., Bethesda, MD (United States)

    1997-02-01

    Under the sponsorship of the Department of Energy, Office of Utility Technologies, the Energy Storage System Analysis and Development Department at Sandia National Laboratories (SNL) conducted a cost analysis of energy storage systems for electric utility applications. The scope of the study included the analysis of costs for existing and planned battery, SMES, and flywheel energy storage systems. The analysis also identified the potential for cost reduction of key components.

  14. Deregulation of the electric utility industry - implications for nuclear power

    International Nuclear Information System (INIS)

    Fern, A.Rose

    2000-01-01

    The deregulation movement sweeping the international electric utility community represents a dramatic shift om the traditional business model of utilities. This paper will focus on deregulation in thc United States and the new challenges for nuclear power plant operators. An overview of the new operating models being implemented in the US will lead into a discussion on new economic and operating concerns for nuclear power plant operators. (author)

  15. Deregulation of the electric utility industry - implications for nuclear power

    International Nuclear Information System (INIS)

    Fern, A.R.

    2001-01-01

    The deregulation movement sweeping the international electric utility community represents a dramatic shift from the traditional utility business model. This paper will focus on deregulation in the United States and the new challenges for nuclear power plant operators. An overview of the new operating models being implemented in the US will lead into a discussion on new economic and operating concerns for nuclear power plant operators. (author)

  16. The EU's major electricity and gas utilities since market liberalization

    International Nuclear Information System (INIS)

    Schuelke, Christian

    2011-06-01

    A major change has taken place in the company structure of the European electricity and gas markets. Twenty years ago, national or regional monopolies dominated the markets and there was strictly no competition between utilities. But since the liberalization of EU energy markets began in the 1990's, companies like E.ON, GDF Suez, EDF, Enel, and RWE have become European giants with activities in a large number of Member States. The advocates of market liberalization did not expect, or even intend, the emergence of a small number of large utilities that control an increasing part of the EU market. Some observers already claim that liberalization has led to an oligopoly with detrimental consequences for competition. Based on extensive background research, this book presents a fact-based analysis of the changes in the European utility sector since the 1990's. Case studies of the seven largest utilities illustrate how companies adapted their strategies to the changing market environment. The author underlines diverging choices and common trends like geographic expansion into new markets via mergers and acquisitions or diversification of business activities with the aim of using synergies between electricity and gas. Contents: Executive Summary. Introduction. Seven Case Studies of Changing Strategies of Major European Energy Utilities since Market Liberalization (E.ON, GDF Suez, EDF, Enel, RWE, Iberdrola, Vattenfall, Other European Utilities). Overview of Major National and Regional Electricity and Gas Market in the EU (Germany, France, United Kingdom, Italy, Spain, Nordic, Belgium and the Netherlands, Central and Eastern Europe). Conclusions. Annex. Bibliography

  17. The rural utility response to Colorado's electricity mandates

    International Nuclear Information System (INIS)

    Tierney, Sean

    2011-01-01

    When Colorado voters passed Amendment 37 in 2004, it became the first state to pass a renewable portfolio standard at the ballet box, suggesting broad appeal to harness and pay for renewable energy. While large urban utilities are prepared to make this transition, smaller cities and rural areas, for various financial and scale issues are severely disadvantaged in trying to incorporate more renewable energy sources into their electricity mix. This was evident by the state's support for Amendment 37, which was passed due to strong support in the Denver metro area-representing nearly half of the state's population. Support for the bill was poor in the rest of the state. Nevertheless, in 2007, the state expanded up Amendment 37 by forcing the utilities in rural communities to diversify their electricity mix. This study surveyed the managers at the state's various rural electric cooperatives and municipal utilities in an effort to gage their attitudes concerning: carbon legislation, conservation and efficiency programs, and their plans for making the transition away from fossil fuel generation. - Highlights: → Communities served by rural utilities opposed Colorado's state-wide RPS, but were forced to adhere anyway. → Most rural utilities are very concerned about the economic impacts of trying to diversify their energy portfolios. → Many of these unregulated utilities were already pushing DSM programs to promote conservation and improve efficiency.

  18. The future of the electric utility industry in Canada

    International Nuclear Information System (INIS)

    Threlkeld, R.

    1995-01-01

    A discussion of future changes in the electric power utility industry in Canada was presented. The impacts of deregulation were considered, including increased competition, and reduced profits resulting from it. Restructuring measures taken by BC Hydro to prepare for industry changes were described. Competition was not only expected to result from new electric utilities, but also gas utilities that are establishing themselves in the home heating business. Emphasis was placed on making the utilities' priorities, the same as their customers'. Flexibility of rate scheduling and increased dependence on customer-owned generation were needed to remain competitive. Exportation of surplus electricity and development of power utilities in developing nations was considered as a potentially lucrative development strategy. It was suggested that making use of strategic alliances within Canada and worldwide, will help to keep utilities ahead of the competition. A warning was issued to the effect that environmental concerns must always be considered well in advance of regulations since they are continually becoming more stringent. Making common cause with customers, and continuous improvement were considered to be the most important keys to future success for the industry

  19. Business administration of PET facilities. A cost analysis of three facilities utilizing delivery FDG

    International Nuclear Information System (INIS)

    Mitsutake, Naohiro; Oku, Shinya; Fujii, Ryo; Furui, Yuji; Yasunaga, Hideo

    2008-01-01

    PET (positron emission tomography) has been proved to be a powerful imaging tool in clinical oncology. The number of PET facilities in Japan has remarkably increased over the last decade. Furthermore, the approval of delivery fluorodeoxyglucose (FDG) in 2005 resulted in a tremendous expansion of the PET institutions without a cyclotron facility. The aim of this study was to conduct a cost analysis of PET institutions that utilized delivery FDG. Three PET facilities using delivery FDG were investigated about the costs for PET service. Fixed costs included depreciation costs for construction and medical equipments such as positron camera. Variable costs consisted of costs for medical materials including delivery FDG. The break-even point was analyzed in each of three institutions. In the three hospitals (A, B and C), the annual number of PET scan was 1,591, 1,637 and 914, while cost per scan was accounted as 110,262 yen, 111,091 yen, and 134,192 yen, respectively. The break-even point was calculated to be 2,583, 2,679 and 2,081, respectively. PET facilities utilizing delivery FDG seemed to have difficulty in business administration. Such a situation suggests the possibility that the current supply of PET facilities might exceed actual demand for the service. The efficiency of resource allocation should be taken into consideration in the future health service researches on PET. (author)

  20. Electric utilities and the demand for natural gas

    Energy Technology Data Exchange (ETDEWEB)

    Uri, N D; Atkinson, S

    1976-03-01

    The scarcity of natural gas has given rise to a series of priorities of deliveries based on end use and drafted by the Federal Power Commission. The U.S. Supreme Court, on June 7, 1972, held that the Commission has jurisdiction over curtailments in the service of gas in interstate commerce to both resale and direct industrial customers. This decision reversed a Fifth Circuit Court ruling that protected direct industrial customers from curtailments. The FPC priority curtailments are classed from 1 to 9, for which electric utilities are concentrated in classes 4 to 9. As weather conditions become more severe, not only do the residential and commercial consumers demand more electrical energy, they also demand more natural gas. The result is that there is less natural gas available for electric utilities to use for generation so they change to an alternative fuel. A demand model for the short term for natural gas for electric utilities is given; primary factors involve the price of natural gas, the prices of substitute fuels, and the demand for electrical energy by the various consumer classes. (MCW)

  1. Utilization of hydrogen gas production for electricity generation in ...

    African Journals Online (AJOL)

    Utilization of hydrogen gas production for electricity generation in fuel cell by Enterobacter aerogenes ADH 43 with many kinds of carbon sources in batch stirred tank reactor. MA Rachman, LD Eniya, Y Liasari, MM Nasef, A Ahmad, H Saidi ...

  2. Sizing Analysis for Aircraft Utilizing Hybrid-Electric Propulsion Systems

    Science.gov (United States)

    2011-03-18

    world, the paragon of animals -William Shakespeare I would not have made it this far without the love and support of my parents. Their work-ethic...xiii  I.  Introduction ...Condition 1 SIZING ANALYSIS FOR AIRCRAFT UTILIZING HYBRID- ELECTRIC PROPULSION SYSTEMS I. Introduction 1. Background Physically

  3. Deregulation and competition in the electric utility marketplace

    International Nuclear Information System (INIS)

    Allen, J.E.

    1995-01-01

    This paper addresses the impact of deregulation and competition in the electric utility marketplace as an extension of the deregulation of the airlines, and natural gas, telephone and trucking industries. The topics of the paper include the events and circumstances leading to deregulation, those involved in the competition, and a scenario for how the industry will develop over the next 20 years

  4. Maximizing your ability to compete as a municipal electrical utility

    International Nuclear Information System (INIS)

    MacOdrum, B.

    1996-01-01

    The implications of the MacDonald Committee's recommendations on introducing competition to Ontario's electricity industry were reviewed from the point of view of Toronto Hydro, the largest municipal utility and Ontario Hydro's largest customer. Issues examined included (1) the consequences of unbundling Ontario Hydro's generating, transmission and distribution functions, (2) the structural change option of phasing-in competition among Ontario Hydro and municipal and other private generators, (3) enhancing the efficiency of the distribution sector, and (4) the relative benefits and consequences of private equity as a means of enhancing competition through the sale of Ontario Hydro's generating assets, or the sale of non-essential business operations. Recommendations to the Committee included the need for the transmission grid to remain under public control, for electricity pricing to take into account the variable environmental impact of different generating types, and the need for transferring regulatory authority over municipal electric utilities from Ontario Hydro to the Ontario Energy Board

  5. Mortality monitoring design for utility-scale solar power facilities

    Science.gov (United States)

    Huso, Manuela; Dietsch, Thomas; Nicolai, Chris

    2016-05-27

    unique conditions encountered at solar facilities. In particular, unlike at wind-power facilities, the unimpeded access to almost all areas within the facilities, the typically flat terrain, and general absence of thick vegetation allow distance-sampling techniques (Buckland and others, 2001, 2004) to be exploited to advantage at industrial solar sites. These protocols build on the work of Nicolai and others (2011), and as our understanding and techniques for monitoring improve, the methods may be further modified to incorporate improvements in the future. We present case studies based on monitoring methods currently implemented at different utility-scale solar facilities to illustrate how distance-sampling techniques may improve overall detectability without substantially increasing costs. Every facility is unique, and the protocols presented may be adapted based on specific monitoring objectives and conditions at each site.We provide guidance for designing monitoring programs whose objective it is to estimate the total number of bird and bat fatalities occurring at a facility over an extended period of time. We address spatial variation in causes of mortality, as well as potential sources of imperfect detection, for example, animals falling in or moving to unsearched areas, carcasses removed by predators, and carcasses missed by searchers. We suggest methods to estimate and account for each source of imperfect detection. This document focuses on monitoring design only and does not discuss approaches for estimating mortality from collected data. The development of statistically sound estimators relevant to the solar context is a current topic of research, although there are already strong foundations for estimation with distance-sampling methods in similar open, arid environments (Anderson and others, 2001; Freilich and others, 2005). Nonetheless, if protocols described in this document are followed, the resulting data will be adequate and sufficient for estimating

  6. Electric power bidding model for practical utility system

    Directory of Open Access Journals (Sweden)

    M. Prabavathi

    2018-03-01

    Full Text Available A competitive open market environment has been created due to the restructuring in the electricity market. In the new competitive market, mostly a centrally operated pool with a power exchange has been introduced to meet the offers from the competing suppliers with the bids of the customers. In such an open access environment, the formation of bidding strategy is one of the most challenging and important tasks for electricity participants to maximize their profit. To build bidding strategies for power suppliers and consumers in the restructured electricity market, a new mathematical framework is proposed in this paper. It is assumed that each participant submits several blocks of real power quantities along with their bidding prices. The effectiveness of the proposed method is tested on Indian Utility-62 bus system and IEEE-118 bus system. Keywords: Bidding strategy, Day ahead electricity market, Market clearing price, Market clearing volume, Block bid, Intermediate value theorem

  7. Consumer's Guide to the economics of electric-utility ratemaking

    Energy Technology Data Exchange (ETDEWEB)

    1980-05-01

    This guide deals primarily with the economics of electric utilities, although certain legal and organizational aspects of utilities are discussed. Each of the seven chapters addresses a particular facet of public-utility ratemaking. Chapter One contains a discussion of the evolution of the public-utility concept, as well as the legal and economic justification for public utilities. The second chapter sets forth an analytical economic model which provides the basis for the next four chapters. These chapters contain a detailed examination of total operating costs, the rate base, the rate of return, and the rate structure. The final chapter discusses a number of current issues regarding electric utilities, mainly factors related to fuel-adjustment costs, advertising, taxes, construction work in progress, and lifeline rates. Some of the examples used in the Guide are from particular states, such as Illinois and California. These examples are used to illustrate specific points. Consumers in other states can generalize them to their states and not change the meaning or significance of the points. 27 references, 8 tables.

  8. An analysis of electric utility embedded power supply costs

    International Nuclear Information System (INIS)

    Kahal, M.; Brown, D.

    1998-01-01

    There is little doubt that for the vast majority of electric utilities the embedded costs of power supply exceed market prices, giving rise to the stranded cost problem. Beyond that simple generalization, there are a number of crucial questions, which this study attempts to answer. What are the regional patterns of embedded cost differences? To what extent is the cost problem attributable to nuclear power? How does the cost of purchased power compare to the cost of utility self-generation? What is the breakdown of utility embedded generation costs between operating costs - which are potentially avoidable--and ownership costs, which by definition are ''sunk'' and therefore not avoidable? How will embedded generation costs and market prices compare over time? These are the crucial questions for states as they address retail-restructuring proposal. This study presents an analysis of generation costs, which addresses these key questions. A computerized costing model was developed and applied using FERC Form 1 data for 1995. The model analyzed embedded power supply costs (i.e.; self-generation plus purchased power) for two groups of investor-owned utilities, 49 non-nuclear vs. 63 nuclear. These two subsamples represent substantially the entire US investor-owned electric utility industry. For each utility, embedded cost is estimated both at busbar and at meter

  9. Impact of Federal tax policy and electric utility rate schedules upon the solar building/electric utility interface. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    Feldman, S.L.; Wirtshafter, R.M.; Abrash, M.; Anderson, B.; Sullivan, P.; Kohler, J.

    1978-10-01

    An analysis is performed to show that a utility solar-passive strategy can be used rather effectively in aiding the utility to obtain more efficient load factors and lower costs. The objectives are to determine the impact of active and passive solar energy designs for space conditioning and hot water heating for the residential sector upon the diurnal and annual load curves for several utilities, to assess the effect of present utility pricing policies, and to examine alternative pricing schemes, as well as Federal and state tax credits, as they may affect the optimal sizing and configuration of active solar and passive solar building components. The methodology, the systems model, an overall building design, building cost determination, and a description of TRNSYS are presented. The major parameters discussed that distinguish variation in the cost-effectiveness of particular building design fall into 5 categories: the weather, building configurations, building costs, utility costs and rates, and financial parameters (inclusive of tax credits for solar and energy conservation investment). Five utilities are studied: Colorado Springs Department of Public Utilities; Public Service Co. of New Mexico; New England Electric System; Pacific Gas and Electric; and Georgia Power Co.

  10. Challenges in sensor development for the electric utility industry

    Science.gov (United States)

    Ward, Barry H.

    1999-01-01

    The electric utility industry is reducing operating costs in order to prepare for deregulation. The reduction in operating cost has meant a reduction in manpower. The ability to utilize remaining maintenance staff more effectively and to stay competitive in a deregulated environment has therefore become critical. In recent years, the industry has moved away from routine or periodic maintenance to predictive or condition based maintenance. This requires the assessment of equipment condition by frequent testing and inspection; a requirement that is incompatible with cost reduction. To overcome this dilemma, industry trends are toward condition monitoring, whereby the health of apparatus is monitored continuously. This requires the installation of sensors hr transducers on power equipment and the data taken forwarded to an intelligent device for further processing. These devices then analyze the data and make evaluations based on parameter levels or trends, in an attempt to predict possible deterioration. This continuous monitoring allows the electric utility to schedule maintenance on an as needed basis. The industry has been faced with many challenges in sensor design. The measurement of physical, chemical and electrical parameters under extreme conditions of electric fields, magnetic fields, temperature, corrosion, etc. is extensive. This paper will give an overview of these challenges and the solutions adopted for apparatus such as power transformers, circuit breakers, boilers, cables, batteries, and rotating machinery.

  11. Efficiency evaluation of the state owned electric utilities in India

    International Nuclear Information System (INIS)

    Thakur, Tripta; Deshmukh, S.G.; Kaushik, S.C.

    2006-01-01

    This paper presents a framework for accessing comparative efficiencies of Indian State Owned Electric Utilities (SOEU), which have been mainly responsible for the generation, distribution and transmission of electricity in India. Performance of 26 utilities was evaluated using the non-parametric technique of Data Envelopment Analysis (DEA), and the impact of scale on the efficiency scores was also evaluated. The results indicate that the performance of several SOEUs is sub-optimal, suggesting the potential for significant cost reductions. Separate benchmarks were derived for possible reductions in employees' number, and the results indicate that several utilities deploy a much larger number of employees than that required by a best practice utility, and significant savings are possible on this account. It was also found that the bigger utilities display greater inefficiencies and have distinct scale inefficiencies. Exploiting scale efficiencies by suitable restructuring and unbundling of SOEUs are therefore crucial measures that may foster efficiencies in the SOEUs. The paper discusses these results in the context of related policy issues

  12. Rent dissipation through electricity prices of publicly owned utilities

    International Nuclear Information System (INIS)

    Bernard, J-T.; Roland, M.

    1997-01-01

    Pricing policies of Canadian public utilities were examined. It was shown that under the existing set of rules the prices established are frequently below the marginal cost. This appears to be particularly true in the case of provinces that rely principally on hydroelectric resources. Study recommendations to bring electricity prices in line with marginal costs have had little success to date despite overwhelming evidence of large economic losses associated with the current institutional arrangements. This situation remains at the same time that governments apply high tax rates on incomes. By putting together two strands of economic literature, public choice and the theory of public utility pricing, this paper develops a simple model that explains why the median consumer prefers a low electricity price and a high tax rate. Hydro-Quebec survey data is used to confirm that these conditions are satisfied in Quebec. 17 refs., 1 tab

  13. User's guide to SERICPAC: A computer program for calculating electric-utility avoided costs rates

    Energy Technology Data Exchange (ETDEWEB)

    Wirtshafter, R.; Abrash, M.; Koved, M.; Feldman, S.

    1982-05-01

    SERICPAC is a computer program developed to calculate average avoided cost rates for decentralized power producers and cogenerators that sell electricity to electric utilities. SERICPAC works in tandem with SERICOST, a program to calculate avoided costs, and determines the appropriate rates for buying and selling of electricity from electric utilities to qualifying facilities (QF) as stipulated under Section 210 of PURA. SERICPAC contains simulation models for eight technologies including wind, hydro, biogas, and cogeneration. The simulations are converted in a diversified utility production which can be either gross production or net production, which accounts for an internal electricity usage by the QF. The program allows for adjustments to the production to be made for scheduled and forced outages. The final output of the model is a technology-specific average annual rate. The report contains a description of the technologies and the simulations as well as complete user's guide to SERICPAC.

  14. Major electric utilities, licensees, and others. Annual report (Form 1), 1990 (field definition of record layout). Data tape documentation

    International Nuclear Information System (INIS)

    1990-01-01

    Data are tabulated from annual reports filed with the Federal Energy Regulatory Commission by 182 major electric utilities. Major electric utilities are defined as those utilities which have had, in the last three consecutive calendar years, sales or transmission services that exceeded one of the following: one million megawatthours of total annual sales, 100 megawatthours of annual sales for resales, 600 megawatthours of gross interchange out, or 500 megawatthours of wheeling for others. Data included: financial and operational balance sheets; income and retained earnings statements; statements of changes in financial position; capital stock and long-term debt; electric operating revenues, customers, and sales by classes of service; electric operation and maintenance expenses; data per type of utility rate base and rates of return on common equity; research, development, and demonstration; and environmental protection facilities and expenses

  15. Strategic rigidity and foresight for technology adoption among electric utilities

    International Nuclear Information System (INIS)

    Shah, Arsalan Nisar; Palacios, Miguel; Ruiz, Felipe

    2013-01-01

    The variation in the adoption of a technology as a major source of competitive advantage has been attributed to the wide-ranging strategic foresight and the integrative capability of a firm. These possible areas of competitive advantage can exist in the periphery of the firm's strategic vision and can get easily blurred as a result of rigidness and can permeate in the decision-making process of the firm. This article explores how electric utility firms with a renewable energy portfolio can become strategically rigid in terms of adoption of newer technologies. The reluctance or delay in the adoption of new technology can be characterized as strategic rigidness, brought upon as a result of a firm's core competence or core capability in the other, more conventional technology arrangement. This paper explores the implications of such rigidness on the performance of a firm and consequently on the energy eco-system. The paper substantiates the results by emphasizing the case of Iberdrola S.A., an incumbent firm as a wind energy developer and its adoption decision behavior. We illustrate that the very routines that create competitive advantage for firms in the electric utility industry are vulnerable as they might also develop as sources of competitive disadvantage, when firms confront environmental change and uncertainty. - Highlights: • Present a firm-level perspective on technology adoption behavior among electric utilities. • Firms with mature technology can become rigid towards newer technologies. • Case study analysis of a major electric utility firm. • Implications of ‘technology rigidness’ on the energy eco-system

  16. How EPRI [Electric Power Research Institute] helps utilities save money

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    A number of case studies are presented which illustrate how the work of the Electric Power Research Institute in the USA has enabled nuclear utilities to save money. The areas covered by the examples are: steam generator tube repair; streamlining of reliability centred maintenance; cost effective instrumentation and control maintenance; reducing the frequency of instrument calibration; optimising the engineering change process; detecting and reducing fuel failure; extending the qualified life of equipment. (U.K.)

  17. Assessing Residential Customer Satisfaction for Large Electric Utilities

    OpenAIRE

    Lea Kosnik; L. Douglas Smith; Satish Nayak; Maureen Karig; Mark Konya; Kristy Lovett; Zhennan Liu; Harrison Luvai

    2015-01-01

    Electric utilities, like other service organizations, rely on customer surveys to assess the quality of their services and customer relations. With responses to an in-depth survey of 2,216 residential customers, complementary data from geo-coded public sources, aggregate assessments of performance by J.D. Power & Associates from their independent surveys, historical records of individual customer usage and bill payments, streams of published media content and records of actual service deliver...

  18. Repeated regulatory failures: British electric utilities, 1919--1937

    Science.gov (United States)

    van der Werf, Ysbrand John

    This dissertation uses previously unexamined firm-level data to look at British electric utilities during the 1919--1937 period. The persistent influence of the 1882 and 1888 Electric Lighting Acts had a significant role in perpetuating the inefficient market structure and high costs of the industry. First, I examine factors that influence costs in 1919 and compare the relative cost efficiency of municipally-owned and investor-owned utilities (munis and IOUs). Scale and load factor are found to be more important than ownership in influencing costs, although IOUs enjoy a scale advantage. Given costs, there is no difference in prices between IOUs and munis, and on average prices were 20 percent below monopoly prices. Looking at the 1919--1928 period and examining changes in the industry as measured by the firms' choices in frequency, current, and interconnections with other utilities shows evidence for a great deal of change, which occurred in statistically predictable ways. Utilities are standardizing the type of current produced, and the eventual localized standard frequencies were selected by 1907. There is little in the way of market rivalry between mum's and IOUs but large munis are less likely to build networks and sell in the wholesale market. Finally, I compare the changes that occurred during the 1919--1928 period, under the weak intervention of the Electricity Commissioners, with those of the 1928--1937 period, under the strong intervention of the Central Electricity Board. Without the CEB localized frequency standards would likely have remained in place. The CEB intervened directly in the wholesale market, but contrary to common perceptions, this strong intervention had relatively little impact on trends observed in the industry under the weak intervention of the 1919--1928 period: the CEB reduced prices and costs by no more than about 15 percent and was responsible for at most a quarter of their decline during the 1928--37 period.

  19. Liberalisation and green patent registrations of electric utilities in Europe

    International Nuclear Information System (INIS)

    Salies, Evens; Nesta, Lionel

    2010-10-01

    The authors report a study of the influence of reforms which introduce a liberalisation of energy markets on the innovation behaviour of electric utilities in some countries. Within a context of concentration of this sector, the hypothesis of a negative impact on patent registration by electric utilities is tested by the authors. They first define the notion of environmental innovation and its evolution in the electric energy sector as the climate and environment issues are nowadays extremely important for the energy sector. R and D here addresses micro-generation, fuel cells, tidal turbine systems, energy production by using solar energy, and biomass gasification. They discuss numbers of pattern registrations by European utilities before and after laws on energy market reform. They present an econometric model and data used to test the hypothesis and comment the obtained results. The model comprises a knowledge production function, and various explicative variables (firm size and R and D, reforms, technological opportunities, energy mix, and influence of demand)

  20. Jordan Research and Training Reactor (JRTR) Utilization Facilities

    International Nuclear Information System (INIS)

    Xoubi, N.

    2013-01-01

    Jordan Research and Training Reactor (JRTR) is a 5 MW light water open pool multipurpose reactor that serves as the focal point for Jordan National Nuclear Centre, and is designed to be utilized in three main areas: Education and training, nuclear research, and radioisotopes production and other commercial and industrial services. The reactor core is composed of 18 fuel assemblies, MTR plate type 19.75% enriched uranium silicide (U 3 Si 2 ) in aluminium matrix, and is reflected on all sides by beryllium and graphite. The reactor power is upgradable to 10 MW with a maximum thermal flux of 1.45×10 14 cm -2 s -1 , and is controlled by a Hafnium control absorber rod and B 4 C shutdown rod. The reactor is designed to include laboratories and classrooms that will support the establishment of a nuclear reactor school for educating and training students in disciplines like nuclear engineering, reactor physics, radiochemistry, nuclear technology, radiation protection, and other related scientific fields where classroom instruction and laboratory experiments will be related in a very practical and realistic manner to the actual operation of the reactor. JRTR is designed to support advanced nuclear research as well as commercial and industrial services, which can be preformed utilizing any of its 35 experimental facilities. (author)

  1. A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets

    Energy Technology Data Exchange (ETDEWEB)

    Warwick, William M.

    2002-06-03

    This primer is offered as an introduction to utility restructuring to better prepare readers for ongoing changes in public utilities and associated energy markets. It is written for use by individuals with responsibility for the management of facilities that use energy, including energy managers, procurement staff, and managers with responsibility for facility operations and budgets. The primer was prepared by the Pacific Northwest National Laboratory under sponsorship from the U.S. Department of Energy?s Federal Energy Management Program. The impetus for this primer originally came from the Government Services Administration who supported its initial development.

  2. The EU's Major Electricity and Gas Utilities since Market Liberalization

    International Nuclear Information System (INIS)

    Schulke, Ch.

    2010-01-01

    A major change has taken place in the company structure of the European electricity and gas markets. Twenty years ago, national or regional monopolies dominated the markets and there was strictly no competition between utilities. But since the liberalization of EU energy markets began in the 1990's, companies like E.ON, GDF Suez, EDF, Enel, and RWE have become European giants with activities in a large number of Member States. The advocates of market liberalization did not expect, or even intend, the emergence of a small number of large utilities that control an increasing part of the EU market. Some observers already claim that liberalization has led to an oligopoly with detrimental consequences for competition. Based on extensive background research, this book presents a fact-based analysis of the changes in the European utility sector since the 1990's. Case studies of the seven largest utilities illustrate how companies adapted their strategies to the changing market environment. The author underlines diverging choices and common trends like geographic expansion into new markets via mergers and acquisitions or diversification of business activities with the aim of using synergies between electricity and gas. (author)

  3. Impacts of Western Area Power Administration's power marketing alternatives on electric utility systems

    International Nuclear Information System (INIS)

    Veselka, T.D.; Portante, E.C.; Koritarov, V.

    1995-03-01

    This technical memorandum estimates the effects of alternative contractual commitments that may be initiated by the Western Area Power Administration's Salt Lake City Area Office. It also studies hydropower operational restrictions at the Salt Lake City Area Integrated Projects in combination with these alternatives. Power marketing and hydropower operational effects are estimated in support of Western's Electric Power Marketing Environmental Impact Statement (EIS). Electricity production and capacity expansion for utility systems that will be directly affected by alternatives specified in the EIS are simulated. Cost estimates are presented by utility type and for various activities such as capacity expansion, generation, long-term firm purchases and sales, fixed operation and maintenance expenses, and spot market activities. Operational changes at hydropower facilities are also investigated

  4. How to develop a world class electrical utility for the free markets of electrical energy?

    International Nuclear Information System (INIS)

    Aaltonen, J.E.; Takala, J.A.

    1995-01-01

    The electricity distribution in Finland is going to the new stage where the electrical energy market will be gradually free from competition. The purpose of this study is to analyze the concept of the world class utility. A feasibility study was made to research the condition in logistics and suitable methods for the implementation. Some ideas have been piloted to verify and find acceptable approaches of the implementation to practice. Utilities improved the cost efficiency and strategical business logistics in a customer oriented and flexible way. The methods and findings can be used on other public and industrial areas, too

  5. Electrical equipment distributors assuming greater role as suppliers to electric utilities

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    A survey was conducted of Canada's largest distributors of electrical equipment to the utility market. Summaries are presented of the views of the major respondents concerning market trends and future challenges. Distributors have emerged as a supply source to utilities over the past two decades. Before then, electric utilities did virtually all their business directly with the manufacturers and rarely with distributors. One reason for this situation was that direct dealing with manufacturers was perceived by the utilites as providing better access to technical advice. Distributors have grown significantly since then and many have their own expert technical staff and provide full support for their products. Various advantages for utilities in dealing with distributors are noted: ability to supply most needs relatively rapidly from stock, simplification of ordering, improved inventory management, and savings in brokerage and other costs associated with imported equipment

  6. Utility of Big Area Additive Manufacturing (BAAM) For The Rapid Manufacture of Customized Electric Vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Love, Lonnie J [ORNL

    2015-08-01

    This Oak Ridge National Laboratory (ORNL) Manufacturing Development Facility (MDF) technical collaboration project was conducted in two phases as a CRADA with Local Motors Inc. Phase 1 was previously reported as Advanced Manufacturing of Complex Cyber Mechanical Devices through Community Engagement and Micro-manufacturing and demonstrated the integration of components onto a prototype body part for a vehicle. Phase 2 was reported as Utility of Big Area Additive Manufacturing (BAAM) for the Rapid Manufacture of Customized Electric Vehicles and demonstrated the high profile live printing of an all-electric vehicle using ONRL s Big Area Additive Manufacturing (BAAM) technology. This demonstration generated considerable national attention and successfully demonstrated the capabilities of the BAAM system as developed by ORNL and Cincinnati, Inc. and the feasibility of additive manufacturing of a full scale electric vehicle as envisioned by the CRADA partner Local Motors, Inc.

  7. Utility emissions associated with electric and hybrid vehicle (EHV) charging

    International Nuclear Information System (INIS)

    1993-04-01

    This project is a joint effort between the US Department of Energy (DOE) and the Electric Power Research Institute (EPRI) to conduct a comprehensive, in-depth assessment of the emission impacts of electric and hybrid vehicles (EHVs). The study determines local and regional emission impacts under a variety of scenarios, covering both conservative and optimistic assumptions about vehicle efficiency, power plant efficiency, and other factors. In all scenarios, EHV use significantly reduces urban emissions of CO, VOC, and TSP. Changes in NO x and CO 2 emissions are very sensitive to average or marginal power plant emissions and vehicle efficiency assumptions. NO x and CO 2 emissions changes vary dramatically by region. Certain combinations of EHV and CV scenarios and regions result in significant reductions, while other combinations result in significant increases. Careful use of these results is advised. In all scenarios, SO 2 increases with EHV use although the amount is small-less than 1% of total utility emissions even vath the deployment of 12 million EHVS. But because of emission cap provisions of the Clean Air Act Amendments of 1990, national SO 2 totals will not be allowed to increase. Thus, utilities will have to apply more stringent measures to combat increased SO 2 emissions due to the increased use of electric vehicles

  8. Power Consumption Analysis of Electrical Installations at Healthcare Facility

    Directory of Open Access Journals (Sweden)

    Emmanuel Guillen-Garcia

    2017-01-01

    Full Text Available This paper presents a methodology for power consumption estimation considering harmonic and interharmonic content and then it is compared to the power consumption estimation commonly done by commercial equipment based on the fundamental frequency, and how they can underestimate the power consumption considering power quality disturbances (PQD. For this purpose, data of electrical activity at the electrical distribution boards in a healthcare facility is acquired for a long time period with proprietary equipment. An analysis in the acquired current and voltage signals is done, in order to compare the power consumption centered in the fundamental frequency with the generalized definition of power consumption. The results obtained from the comparison in the power consumption estimation show differences between 4% and 10% of underestimated power consumption. Thus, it is demonstrated that the presence of harmonic and interharmonic content provokes a significant underestimation of power consumption using only the power consumption centered at the fundamental frequency.

  9. Comparative financial analysis of electricity utilities in West Africa

    International Nuclear Information System (INIS)

    Fritsch, Remi

    2011-01-01

    Access to electricity is a major issue in West Africa. Governments have a difficult equation to solve. They naturally seek to offer their people a cheap kWh. But they are constrained by a production based largely on oil and therefore highly volatile production costs. How to fix an acceptable tariff, taking into account the investment needs required to expand the network and increase production? This analysis should provide some answers. The study presented in this paper provides a financial analysis of electricity utilities in West Africa. It allows a comparison of performances on a number of key financial ratios related to operations (Earning Before Interest Taxes Debt and Amortization/sales, working capital requirement/sales, days of receivables or payables), investment (net fixed assets/gross fixed assets), bank financing (financial structure, debt/EBITDA, interest expense/EBITDA) and economic and financial returns (Return On Capital Employed, Return On Equity). The conclusion focuses on the growth opportunity that the electricity sector could represent for each country. But this opportunity may only materialize if the EBITDA margins are restored. The available options appear limited and must be assessed taking into account the context of each country: tariff increase, improvement of technical losses or diversification into means of production no longer based primarily on oil or gas. - Highlights: → The study provides a financial analysis of electricity distribution companies in West Africa. → The study highlights generally insufficient EBITDA margins. → The study raises the question of tariffs and contribution to Gross Domestic Product of the electricity sector. → The conclusion focuses on the growth opportunity that the electricity sector could represent for each country.

  10. An integrated approach for facilities planning by ELECTRE method

    Science.gov (United States)

    Elbishari, E. M. Y.; Hazza, M. H. F. Al; Adesta, E. Y. T.; Rahman, Nur Salihah Binti Abdul

    2018-01-01

    Facility planning is concerned with the design, layout, and accommodation of people, machines and activities of a system. Most of the researchers try to investigate the production area layout and the related facilities. However, few of them try to investigate the relationship between the production space and its relationship with service departments. The aim of this research to is to integrate different approaches in order to evaluate, analyse and select the best facilities planning method that able to explain the relationship between the production area and other supporting departments and its effect on human efforts. To achieve the objective of this research two different approaches have been integrated: Apple’s layout procedure as one of the effective tools in planning factories, ELECTRE method as one of the Multi Criteria Decision Making methods (MCDM) to minimize the risk of getting poor facilities planning. Dalia industries have been selected as a case study to implement our integration the factory have been divided two main different area: the whole facility (layout A), and the manufacturing area (layout B). This article will be concerned with the manufacturing area layout (Layout B). After analysing the data gathered, the manufacturing area was divided into 10 activities. There are five factors that the alternative were compared upon which are: Inter department satisfactory level, total distance travelled for workers, total distance travelled for the product, total time travelled for the workers, and total time travelled for the product. Three different layout alternatives have been developed in addition to the original layouts. Apple’s layout procedure was used to study and evaluate the different alternatives layouts, the study and evaluation of the layouts was done by calculating scores for each of the factors. After obtaining the scores from evaluating the layouts, ELECTRE method was used to compare the proposed alternatives with each other and with

  11. Thermal burn and electrical injuries among electric utility workers, 1995-2004.

    Science.gov (United States)

    Fordyce, Tiffani A; Kelsh, Michael; Lu, Elizabeth T; Sahl, Jack D; Yager, Janice W

    2007-03-01

    This study describes the occurrence of work-related injuries from thermal-, electrical- and chemical-burns among electric utility workers. We describe injury trends by occupation, body part injured, age, sex, and circumstances surrounding the injury. This analysis includes all thermal, electric, and chemical injuries included in the Electric Power Research Institute (EPRI) Occupational Health and Safety Database (OHSD). There were a total of 872 thermal burn and electric shock injuries representing 3.7% of all injuries, but accounting for nearly 13% of all medical claim costs, second only to the medical costs associated with sprain- and strain-related injuries (38% of all injuries). The majority of burns involved less than 1 day off of work. The head, hands, and other upper extremities were the body parts most frequently injured by burns or electric shocks. For this industry, electric-related burns accounted for the largest percentage of burn injuries, 399 injuries (45.8%), followed by thermal/heat burns, 345 injuries (39.6%), and chemical burns, 51 injuries (5.8%). These injuries also represented a disproportionate number of fatalities; of the 24 deaths recorded in the database, contact with electric current or with temperature extremes was the source of seven of the fatalities. High-risk occupations included welders, line workers, electricians, meter readers, mechanics, maintenance workers, and plant and equipment operators.

  12. The Municipal Electrical Utilities' role in buying and selling power

    International Nuclear Information System (INIS)

    Crocker, D.I.

    1999-01-01

    Ontario's Municipal Electrical Utilities (MEUs) are the front-line providers of electricity services for most of the consumers in Ontario. MEUs serve 2.8 million customers (about 70 per cent of all power sold in Ontario). The new regulatory regime resulting from Ontario's Energy Competition Act (1998) will significantly impact MEUs. The changes aim to consolidate and rationalize the point of sale provision of power to Ontario customers and increase the efficiency of the sector. The Energy Competition Act (1998) creates a competitive electricity marketplace and provides mechanisms for its operation, but it is the MEUs which will bear the risk of market failures. Some of the changes which will be most important to MEUs are: (1) incorporation, (2) default supplier, and (3) oversight by the OEB. It is the author's view that the move towards open markets in electricity is unlikely to enlarge the decision making power of MEUs. On the contrary, the legislative scheme creates a complex regulatory environment wherein the distribution corporation must strictly comply with the OEB's requirements and public policy concerns in exercising its functions. As the MEUs essentially serve as a buffer in the newly opened retail markets, they must find ways to minimize their risk of market failures or spread the cost so as to remain viable commercial entities. They must also devise new information systems prior to the opening of the new market to deal with customer and default consumer pricing, billing and transfer of customers to and from retailers. Municipal utilities will also have to consider restructuring of their own operations, including determining which businesses should be pursued through competitive affiliates

  13. How energy derivatives can add value for municipal electrical utilities

    International Nuclear Information System (INIS)

    Tamplen, B.

    1998-01-01

    The challenges that municipal electric utilities (MEUs) face in the new deregulated power market in North America were discussed. This presentation also highlighted the factors that affected the risk that companies in the U.S. Mid-West were exposed to in June 1998. During that time, MEUs had to deal with financial fallouts and price spikes as a result of very high temperatures, generation outages, and transmission line relief. The focus is on price risk and credit risk and how a strong risk management team can be instrumental in avoiding price spikes like those that occurred in June 1998

  14. Environmental exposures in the US electric utility industry

    International Nuclear Information System (INIS)

    Repetto, R.; Henderson, J.

    2003-01-01

    Quantitative analysis of 47 US investor-owned electric utilities' environmental exposures to impending air quality and climate policies shows potentially material and highly differentiated financial impacts. For many companies the minimized compliance costs of a four-pollutant cap-and-trade regulatory regime would be less than those of a three-pollutant regime that omitted controls on carbon dioxide emissions. Fragmented regulatory requirements would have the highest compliance costs. The companies studied vary considerably in the adequacy of their financial reporting of these potential impacts. Greater transparency would benefit investors and the most favorably positioned companies. (author)

  15. Electric utility fuel choice behavior in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Joskow, P.L.; Mishkin, F.S.

    1977-10-01

    Electric utility fuel choice behavior is analyzed by a conditional logit model to determine the effects of changing oil prices of five plants. Three of the plants faced favorable expected coal prices and, like many areas of the country, were insensitive to changing oil prices. This was not the case at the New England plant, however, where relatively small price increases would decrease the likelihood of choosing oil as an alternative fuel for new plants. The modeling of utility behavior in fuel decisions is felt to be applicable to other industries where a continuum of decision possibilities does not reasonably characterize choice alternatives. New behavior models are urged in order to obtain better predictions of the effects of a changing economic environment. 10 references.

  16. Facile synthesis of degradable and electrically conductive polysaccharide hydrogels.

    Science.gov (United States)

    Guo, Baolin; Finne-Wistrand, Anna; Albertsson, Ann-Christine

    2011-07-11

    Degradable and electrically conductive polysaccharide hydrogels (DECPHs) have been synthesized by functionalizing polysaccharide with conductive aniline oligomers. DECPHs based on chitosan (CS), aniline tetramer (AT), and glutaraldehyde were obtained by a facile one-pot reaction by using the amine group of CS and AT under mild conditions, which avoids the multistep reactions and tedious purification involved in the synthesis of degradable conductive hydrogels in our previous work. Interestingly, these one-pot hydrogels possess good film-forming properties, electrical conductivity, and a pH-sensitive swelling behavior. The chemical structure and morphology before and after swelling of the hydrogels were verified by FT-IR, NMR, and SEM. The conductivity of the hydrogels was tuned by adjusting the content of AT. The swelling ratio of the hydrogels was altered by the content of tetraaniline and cross-linker. The hydrogels underwent slow degradation in a buffer solution. The hydrogels obtained by this facile approach provide new possibilities in biomedical applications, for example, biodegradable conductive hydrogels, films, and scaffolds for cardiovascular tissue engineering and controlled drug delivery.

  17. Financial statistics of major U.S. investor-owned electric utilities 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The Financial Statistics of Major US Investor-Owned Electric Utilities publication presents summary and detailed financial accounting data on the investor-owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for making policy and decisions relating to investor-owned electric utility issues. The US electric power industry is a combination of electric utilities (investor-owned, publicly owned, Federal, and cooperatives) and nonutility power producers. Investor-owned electric utilities account for over three-fourths of electric sales and revenue. Historically, the investor-owned electric utilities have served the large consolidated markets. There is substantial diversity among the investor-owned electric utilities in terms of services, size, fuel usage, and prices charged. Most investor-owned electric utilities generate, transmit, and distribute electric power. Investor-owned electric utilities operate in all States except Nebraska; Hawaii is the only State in which all electricity is supplied by investor-owned electric utilities. 5 figs., 57 tabs.

  18. Financial statistics of selected publicly owned electric utilities 1989. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-02-06

    The Financial Statistics of Selected Publicly Owned Electric Utilities publication presents summary and detailed financial accounting data on the publicly owned electric utilities. The objective of the publication is to provide the Federal and State governments, industry, and the general public with data that can be used for policymaking and decision making purposes relating to publicly owned electric utility issues. 21 tabs.

  19. 76 FR 3517 - Standards of Performance for Fossil-Fuel-Fired, Electric Utility, Industrial-Commercial...

    Science.gov (United States)

    2011-01-20

    ... Standards of Performance for Fossil-Fuel-Fired, Electric Utility, Industrial-Commercial-Institutional, and... following: Category NAICS \\1\\ Examples of regulated entities Industry 221112 Fossil fuel-fired electric utility steam generating units. Federal Government 22112 Fossil fuel-fired electric utility steam...

  20. Overview of U.S. electric utilities: Transmission and distribution systems

    International Nuclear Information System (INIS)

    Brown, R.D.

    1994-01-01

    I hope this brief description of the US electric utility industry has been interesting and informative. No doubt many characteristics, concerns, and research efforts mirror those of the electric utility industry in South Korea. It is hoped that through workshops such as this that electric utilities, manufacturers and consultants may learn from each other for the mutual benefit of all

  1. Visibility and Visual Characteristics of the Ivanpah Solar Electric Generating System Power Tower Facility

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Robert [Argonne National Lab. (ANL), Argonne, IL (United States); Abplanalp, Jennifer M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2015-03-01

    This report presents the results of a study conducted to document the visibility and visual characteristics of the Ivanpah Solar Electric Generating System (ISEGS), a utility-scale solar power tower facility located on land administered by the U.S. Department of the Interior Bureau of Land Management in southern California. Study activities consisted of field observations of the ISEGS facility and comparison of the observations made in the field with the visual contrast assessments and visual simulations in the ISEGS Final Environmental Impact Statement (Final EIS) and supporting documents created prior to ISEGS construction. Field observations of ISEGS were made from 19 locations within 35 mi (56 km) of the facility in the course of one week in September 2014. The study results established that reflected sunlight from the receivers was the primary source of visual contrast from the operating ISEGS facility. The ISEGS facility was found to be a major source of visual contrast for all observations up to 20 mi (32 km), and was easily visible at 35 mi. Glare from individual heliostats was frequently visible, and often brighter than the reflected light from the receivers. Heliostat glare caused discomfort for one or more viewers at distances up to 20 mi. The ISEGS power blocks were brightly lit at night, and were conspicuous at the observation distance of approximately 6 mi (10 km). The facility is substantially brighter and is seen more clearly in the field than in photographs of the facility or in the prepared simulations, which were based on photographs. The simulations of the ISEGS facility in the Final EIS, which were evaluated as part of this study, sometimes lacked spatial accuracy and realism. The evaluated simulations generally under-represented the actual visual contrast from the project, and some of the contrast ratings in the Final EIS predicted substantially lower levels of visual contrast than were actually observed for the operating facility.

  2. Electrical energy and cost for the mirror fusion test facility

    International Nuclear Information System (INIS)

    Pence, G.

    1983-01-01

    An operational scenario has been developed for the Mirror Fusion Test Facility (MFTF-B) based on the System Requirements, our experience with existing systems, and discussions with the project engineers and designers who are responsible for the systems. This scenario was used to predict the amount of electrical energy needed for running the facility. A generic type listing is included for the equipment considered in each system. A figure shows the anticipated power drain during a five-minute shot sequence from the 115-kV substation, and from the 230-kV and direct feed substations. At this time, the three major substations that will be used for the MFTF-B are billed under three different rate schedules. A table lists these schedules and what they are anticipated as being when the facility becomes operational. The system availability, which is expected to be 0.7 or better, has not been factored into these calculations. This gives a worst case cost for the MFTF-B. Based on this study, it appears that our energy bill will be over $500 000 per month, on the average. This expenditure will constitute a significant portion of the budget needed to operate the MFTF-B. As the systems are refined, and a more accurate picture is obtained as to the size and operational cycles of the equipment, this report will be updated

  3. Utilization of excess wind power in electric vehicles

    International Nuclear Information System (INIS)

    Hennings, Wilfried; Mischinger, Stefan; Linssen, Jochen

    2013-01-01

    This article describes the assessment of future wind power utilization for charging electric vehicles (EVs) in Germany. The potential wind power production in the model years 2020 and 2030 is derived by extrapolating onshore wind power generation and offshore wind speeds measured in 2007 and 2010 to the installed onshore and offshore wind turbine capacities assumed for 2020 and 2030. The energy consumption of an assumed fleet of 1 million EVs in 2020 and 6 million in 2030 is assessed using detailed models of electric vehicles, real world driving cycles and car usage. It is shown that a substantial part of the charging demand of EVs can be met by otherwise unused wind power, depending on the amount of conventional power required for stabilizing the grid. The utilization of wind power is limited by the charging demand of the cars and the bottlenecks in the transmission grid. -- Highlights: •Wind power available for charging depends on minimum required conventional power (must-run). •With 20 GW must-run power, 50% of charging can be met by excess wind power. •Grid bottlenecks decrease charging met by wind power from 50 % to 30 %. •With zero must-run power, only very little wind power is available for charging

  4. Utilization of oil wells for electricity generation: Performance and economics

    International Nuclear Information System (INIS)

    Kharseh, Mohamad; Al-Khawaja, Mohammed; Hassani, Ferri

    2015-01-01

    There is a general agreement that the climate change, which is the most important challenge facing humanity, is anthropogenic and attributed to fossil fuel consumption. Therefore, deploying more renewable energy resources is an urgent issue to be addressed. Geothermal refers to existing heat energy in deep rock and sedimentary basins. Traditionally, geothermal energy has been exploited in places with plentiful hot water at relatively shallow depth. Unfortunately, the high exploration and drilling costs of boreholes is the main barrier to the commerciality of geothermal worldwide. In oil producing countries, such problems can be overcome by utilizing oil or gas wells. The current study presents thermodynamic and economic analyses of a binary geothermal power generation system for commercial electricity generation. Two different source temperatures (100 and 120 °C) and constant sink temperature (29 °C) were considered. The optimal working fluid and optimal design that improve the performance of the plant are determined. For the current costs in Qatar, the economical analysis of 5 MW geothermal plant shows that the levelized cost of electricity for the plant varies from 5.6 to 5.2 ¢/kW. Whereas, the payback period of such plants lies between 5.8 and 4.8 years. - Highlights: • Utilizing oil well makes geothermal plant competitive with other resources. • R32 seems to be the best working fluid. • The levelized cost of electricity for geothermal plant is less than 5.6 ¢/kWh. • The payback time of geothermal plant is less than 6 years.

  5. State Performance-Based Regulation Using Multiyear Rate Plans for U.S. Electric Utilities

    Energy Technology Data Exchange (ETDEWEB)

    Lowry, Mark Newton [Pacific Economics Group Research LLC (United States); Makos, Matt [Pacific Economics Group Research LLC (United States); Deason, Jeff [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Schwartz, Lisa [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-07-31

    Electric utilities today must contain costs at a time when many need to modernize aging systems and all face major changes in technologies, customer preferences and competitive pressures.Most U.S. electric utility facilities are investor-owned, subject to rate and service regulation by state public utility commissions. Regulatory systems under which these utilities operate affect their performance and ability to meet these challenges. In this business environment, multiyear rate plans have some advantages over traditional rate regulation.The report focuses on key design issues and provides case studies of the multiyear rate plan approach, applicable to both vertically integrated and restructured states. Mark Newton Lowry and Matt Makos of Pacific Energy Group Research and Jeff Deason of Berkeley Lab authored the report; Lisa Schwartz, Berkeley Lab, was project manager and technical editor.The report is aimed primarily at state utility regulators and stakeholders in the state regulatory process. The multiyear rate approach also provides ideas on how to streamline oversight of public power utilities and rural electric cooperatives for their governing boards.Two key provisions of multiyear rate plans strengthen cost containment incentives and streamline regulation: 1. Reducing frequency of rate cases, typically to every four or five years 2. Using an attrition relief mechanism to escalate rates or revenue between rate cases to address cost pressures such as inflation and growth in number of customers, independently of the utility’s own cost Better utility performance can be achieved under well-designed multiyear rate plans while achieving lower regulatory costs. Benefits can be shared between utilities and their customers. But plans can be complex and involve significant changes in the regulatory system. Designing plans that stimulate utility performance without undue risk and share benefits fairly can be challenging.This report discusses the rationale for multiyear

  6. Effect of Facility Ownership on Utilization of Arthroscopic Shoulder Surgery.

    Science.gov (United States)

    Black, Eric M; Reynolds, John; Maltenfort, Mitchell G; Williams, Gerald R; Abboud, Joseph A; Lazarus, Mark D

    2018-03-01

    We examined practice patterns and surgical indications in the management of common shoulder procedures by surgeons practicing at physician-owned facilities. This study was a retrospective analysis of 501 patients who underwent arthroscopic shoulder procedures performed by five surgeons in our practice at one of five facilities during an 18-month period. Two of the facilities were physician-owned, and three of the five surgeons were shareholders. Demographics, insurance status, symptom duration, time from injury/symptom onset to the decision to perform surgery (at which time surgical consent is obtained), and time to schedule surgery were studied to determine the influence of facility type and physician shareholder status. Median duration of symptoms before surgery was significantly shorter in workers' compensation patients than in non-workers' compensation patients (47% less; P 0.05). Time between presentation and surgical consent was not influenced by facility ownership (P = 0.39) or shareholder status (P = 0.50). Time from consent to procedure was 13% faster in physician-owned facilities than in non-physician-owned facilities (P = 0.03) and 35% slower with shareholder physicians than with nonshareholder physicians (P < 0.0001). The role of physician investment in private healthcare facilities has caused considerable debate in the orthopaedic surgery field. To our knowledge, this study is the first to examine the effects of shareholder status and facility ownership on surgeons' practice patterns, surgical timing, and measures of nonsurgical treatment before shoulder surgery. Neither shareholder status nor facility ownership characteristics influenced the speed with which surgeons determined that shoulder surgery was indicated or surgeons' use of preoperative nonsurgical treatment. After the need for surgery was determined, patients underwent surgery sooner at physician-owned facilities than at non-physician-owned facilities and with nonshareholder physicians than

  7. Outsourcing decision factors in publicly owned electric utilities

    Science.gov (United States)

    Gonzales, James Edward

    Purpose. The outsourcing of services in publicly owned electric utilities has generated some controversy. The purpose of this study was to explore this controversy by investigating the relationships between eight key independent variables and a dependent variable, "manager perceptions of overall value of outsourced services." The intent was to provide data so that utilities could make better decisions regarding outsourcing efforts. Theoretical framework. Decision theory was used as the framework for analyzing variables and alternatives used to support the outsourcing decision-making process. By reviewing these eight variables and the projected outputs and outcomes, a more predictive and potentially successful outsourcing effort can be realized. Methodology. A survey was distributed to a sample of 323 publicly owned electric utilities randomly selected from a population of 2,020 in the United States. Analysis of the data was made using statistical techniques including the Chi-Square, Lambda, Spearman's coefficient of rank correlation, as well as the Hypothesis Test, Rank Correlation, to test for relationships among the variables. Findings. Relationships among the eight key variables and perceptions of the overall value of outsourced services were generally weak. The notable exception was with the driving force (reason) for outsourcing decisions where the relationship was strongly positive. Conclusions and recommendations. The data in support of the research questions suggest that seven of the eight key variables may be weakly predictive of perceptions of the overall value of outsourced services. However, the primary driving force for outsourcing was strongly predictive. The data also suggest that many of the sampled utilities did not formally address these variables and alternatives, and therefore may not be achieving maximal results. Further studies utilizing customer perceptions rather than those of outsourcing service managers are recommended. In addition, it is

  8. Cold recovery during regasification of LNG part one: Cold utilization far from the regasification facility

    International Nuclear Information System (INIS)

    La Rocca, Vincenzo

    2010-01-01

    The paper deals with cold recovery during LNG regasification. The applications analyzed pertain to the use in deep freezing agro food industry and in space air conditioning facilities in commercial sector (Supermarkets and Hypermarkets) of cold recovered from the regasification process. A modular LNG regasification unit is proposed having the regasification capacity of 2 BCM/year of gas and it is based on use of a Power Cycle working with Ethane, this unit allows operation of cold energy transfer, contained in LNG to be regasified, in a range of temperatures suitable for multipurpose use of cold, reducing regasification process irreversibility. Some electric energy is produced by the Power Cycle, but the purpose of the modular unit is to deliver cold suitable for industrial and commercial use in the proper temperature range utilizing Carbon dioxide as secondary fluid to transfer cold from regasification site to far end users. The subject is divided in two papers: this paper deals with facilities delivering cold released during LNG regasification and related pipeline facilities to transfer cold at far end users while the other paper pertains to analysis of end users applications. Results of a detailed thermodynamic and economic analysis demonstrate the suitability of the proposal.

  9. Communications architecture for an electric company, European utility communications architecture, EURUCA

    Energy Technology Data Exchange (ETDEWEB)

    Uuspaeae, P [VTT Energy, Espoo (Finland)

    1998-08-01

    The scope of this research is integration and interoperability of various information systems and data communications for electric utilities. Utility Communication Architecture refers to an overall view of the communications needs and communication systems in an electric utility. The objective is to define and specify suitable and compatible communications procedures within the Utility and also to outside parties

  10. Effective use of electric power facilities and promotion of energy conservation

    International Nuclear Information System (INIS)

    Tokumitsu, Iwao

    1999-01-01

    The capacity of Japan's commercial electric power facilities has been increased to more than 200 million kw. In order to provide a stable supply of electric power to meet constantly fluctuaring electric power demands, Japan's power plants generate electricity using an optimal combination of facilities, with nuclear power and coal-fired thermoelectric power providing the base load supply. In the use of electric power, moreover, measures are being implemented to reduce generation costs, conserve energy, and cut carbon dioxide emissions by reducing maximum output and equalizing the load. This report presents information concerning measures for improving the efficiency of electric power facilities operation, equalizing the load and promoting energy conservation. (author)

  11. Evaluation of overweight load routing on buried utility facilities

    Science.gov (United States)

    2011-02-01

    Overweight traffic movements can negatively affect pavement integrity and quality. However, it is less : known to what degree buried utility plant along and across the right of way is affected by these overweight : loads, especially if the utility fa...

  12. Proposed design criteria for a fusion facility electrical ground system

    International Nuclear Information System (INIS)

    Armellino, C.A.

    1983-01-01

    Ground grid design considerations for a nuclear fusion reactor facility are no different than any other facility in that the basis for design must be safety first and foremost. Unlike a conventional industrial facility the available fault energy comes not only from the utility source and in-house rotating machinery, but also from energy storage capacitor banks, collapsing magnetic fields and D.C. transmission lines. It is not inconceivable for a fault condition occurrence where all available energy can be discharged. The ground grid must adequately shunt this sudden energy discharge in a way that personnel will not be exposed by step and/or touch to hazardous energy levels that are in excess of maximum tolerable levels for humans. Fault energy discharge rate is a function of the ground grid surge impedance characteristic. Closed loop paths must be avoided in the ground grid design so that during energy discharge no stray magnetic fields or large voltage potentials between remote points can be created by circulating currents. Single point connection of equipment to the ground grid will afford protection to personnel and sensitive equipment by reducing the probability of circulating currents. The overall ground grid system design is best illustrated as a wagon wheel concept with the fusion machine at the center. Radial branches or spokes reach out to the perimeter limits designated by step-and-touch high risk areas based on soil resistivity criteria considerations. Conventional methods for the design of a ground grid with all of its radial branches are still pertinent. The center of the grid could include a deep well single ground rod element the length of which is at least equivalent to the radius of an imaginary sphere that enshrouds the immediate machine area. Special facilities such as screen rooms or other shielded areas are part of the ground grid system by way of connection to radial branches

  13. Comparing the steam and electric heat tracing solutions for petrochemical or refining facilities

    Energy Technology Data Exchange (ETDEWEB)

    Young, Joseph G.; McQueen, Greg [Tyco Thermal Controls, Belgie (Belgium)

    2012-07-01

    In this era of energy conservation and cost reduction, the ability to effectively select the optimal solution to meet the heat management system needs of petrochemical or refining facilities is becoming increasingly important. Depending on the type and location of the plant, a heat management system (HMS) can comprise a significant portion of the overall capital expenditure, as well as the ongoing operating and maintenance costs. Several important heat management system design decisions affect the financial operations of a facility, including the selection of the heat tracing technology, the utility distribution scheme, and the insulation system criteria, among others. However, most of these decisions are made early in the project life-cycle without thorough analysis of the various options available. From a high level perspective, numerous heat trace media should be considered, including electric, steam, tempered water, and glycol. These systems also have different impacts on piping systems within the plant battery limits (ISBL) and transfer lines outside of the battery limits (OSBL). This paper takes a careful look at two of the predominant heat tracing technologies - electric heat tracing and steam tracing - and compares these within the larger framework of the heat management system, and relative to petrochemical or refining facilities within the general Brazil geography. In the broader context, a heat management system is defined as the heat tracing technology itself, the utility distribution associated with that technology, the control and monitoring scheme associated with that technology, and the insulation system. We will evaluate the capital expenditure cost, operating expenditure cost, and overall reliability of the electric and steam tracing mediums in both the ISBL and OSBL environments within this broader context. (author)

  14. Seismic risk analysis for the Westinghouse Electric facility, Cheswick, Pennsylvania

    International Nuclear Information System (INIS)

    1977-01-01

    This report presents the results of a detailed seismic risk analysis of the Westinghouse Electric plutonium fuel development facility at Cheswick, Pennsylvania. This report focuses on earthquakes. The historical seismic record was established after a review of available literature, consultation with operators of local seismic arrays and examination of appropriate seismic data bases. Because of the aseismicity of the region around the site, an analysis different from the conventional closest approach in a tectonic province was adapted. Earthquakes as far from the site as 1,000 km were included, as were the possibility of earthquakes at the site. In addition, various uncertainties in the input were explicitly considered in the analysis. For example, allowance was made for both the uncertainty in predicting maximum possible earthquakes in the region and the effect of the dispersion of data about the best fit attenuation relation. The attenuation relationship is derived from two of the most recent, advanced studies relating earthquake intensity reports and acceleration. Results of the risk analysis, which include a Bayesian estimate of the uncertainties, are presented as return period accelerations. The best estimate curve indicates that the Westinghouse facility will experience 0.05 g every 220 years and 0.10 g every 1400 years. The accelerations are very insensitive to the details of the source region geometries or the historical earthquake statistics in each region and each of the source regions contributes almost equally to the cumulative risk at the site

  15. West Valley Demonstration Project facilities utilization plan for the existing facilities at the Western New York Nuclear Service Center

    International Nuclear Information System (INIS)

    Skillern, C.G.

    1986-05-01

    In 1980, Congress passed Public Law 96-368, the West Valley Demonstration Project (WVDP) Act. As a primary objective, the Act authorized the US Department of Energy (DOE) to solidify the high-level waste (HLW) stored at the Western New York Nuclear Service Center (WNYNSC) into a form suitable for transportation and disposal in a federal repository. This report will describe how WVDP proposes to use the existing WNYNSC Facilities in an efficient and technically effective manner to comply with Public Law 96-368. In support of the above cited law, the DOE has entered into a ''Cooperative agreement between the United States Department of Energy and the New York State Energy Research and Development Authority on the Western New York Nuclear Service Center at West Valley, New York.'' The state-owned areas turned over to the DOE for use are as follows: Process Plant, Waste Storage, Low-Level Waste Treatment Facility, Service Facilities, Plant Security, and Additional Facilities. The Facilities Utilization Plan (FUP) describes how the state-owned facilities will be utilized to complete the Project; it is divided into five sections as follows: Executive Summary - an overview; Introduction - the WVDP approach to utilizing the WNYNSC Facilities; WVDP Systems - a brief functional description of the system, list of equipment and components to be used and decontamination and decommissioning (D and D) support; WVDP Support Facilities; and Caveats that could effect or change the potential usage of a particular area

  16. Deregulation and restructuring of the electric utility industry

    Energy Technology Data Exchange (ETDEWEB)

    Nixon, Hal [Utility Workers Union of America (UWUA), AFL-CIO, (United States)

    1997-12-31

    Federal and state policy makers are currently faced with the rapidly evolving issue of the restructuring and potential deregulation of the electric utility industry, a sector of the economy of huge importance through its sheer size and its impact on the daily life and livelihood of everyone. This paper describes eleven principles that must be adhered to in any restructuring of the electric industry. Adherence to the principle and positions outlined can help assure that the transition in this industry benefits all, not just a few, and that the general health and welfare of the people is protected and enhanced [Espanol] Los legisladores estatales y federales se estan enfrentando con el rapido y envolvente aspecto de la reestructuracion y desregulacion potencial de la industria electrica, un sector de la economia de enorme importancia por su tamano y su impacto en la vida diaria y los medios de vida. En esta ponencia se describen once principios y posiciones que deben ser considerados en cualquier reestructuracion de la industria electrica. El apego a los principios y posiciones comentados puede ayudar a asegurar que la transicion en esta industria deneficie a todos, no solo a unos cuantos, y que la salud general y bienestar de la gente sea protegida y mejorada

  17. Utilization of the BARC critical facility for ADS related experiments

    Indian Academy of Sciences (India)

    The paper discusses the basic design of the critical facility, whose main pur- ... systems. In addition, it will have a flux mapping system based on 25 fission ... neutron source leads to peaked flux distribution exciting other higher harmonic.

  18. A new international role for large electric utilities

    International Nuclear Information System (INIS)

    Johnson, P. M.

    1993-01-01

    Population pressures leading to changes in India, China, and South America during the next twenty-five years and the resulting revolutionary shifts in the world's major economic axes, such as growth in populations, in demand for consumer goods, in production capacities, and in energy demand, will demand greater international cooperation according to a former premier of the province of Quebec. He stressed in particular, the contributions that large electrical utilities can play in this world-wide transformation. He predicted the possibility of privatization and an extended role in international energy activities for Hydro-Quebec as a result of these major demographic and economic changes in Asia and South America, and the consequent decline in the economies of the G7 countries. Major capital investments abroad, and the formation of networks of domestic and foreign partnerships in the developing world were predicted to be the key to the survival and continuing success not only of Hydro-Quebec, but all major utility companies

  19. Techniques of analyzing the impacts of certain electric-utility ratemaking and regulatory-policy concepts. Bibliography

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-08-01

    This bibliography provides documentation for use by state public utility commissions and major nonregulated utilities in evaluating the applicability of a wide range of electric utility rate design and regulatory concepts in light of certain regulatory objectives. Part I, Utility Regulatory Objectives, contains 2084 citations on conservation of energy and capital; efficient use of facilities and resources; and equitable rates to electricity consumers. Part II, Rate Design Concepts, contains 1238 citations on time-of-day rates; seasonally-varying rates; cost-of-service rates; interruptible rates (including the accompanying use of load management techniques); declining block rates; and lifeline rates. Part III, Regulatory Concepts, contains 1282 references on restrictions on master metering; procedures for review of automatic adjustment clauses; prohibitions of rate or regulatory discrimination against solar, wind, or other small energy systems; treatment of advertising expenses; and procedures to protect ratepayers from abrupt termination of service.

  20. The regulatory treatment of adverse outcomes: Empirical evidence from the electric utility industry

    International Nuclear Information System (INIS)

    Ryan, N.E.

    1991-01-01

    This dissertation consists of two essays, both of them empirical studies using data from the US electric utility industry. Part I focuses on utilities' investment behavior, while Part II examines regulatory policy toward the industry. The first paper presents an analysis of utilities' decisions about whether to continue or cancel nuclear construction projects. During the seventies and eighties, changes in economic conditions and regulatory policy radically altered the costs and benefits of nuclear power. This study seeks to determine whether regulators pursued policies which induced utilities to employ socially efficient criteria in re-evaluating ongoing projects. The analysis also yields insights into regulators' distributional goals. Results based on data for 1978-84 are consistent with the capture theory hypothesis, which holds that regulators weigh industry interests more heavily than consumer interests. A test for structural change provides no support for the contention that the relative importance of consumer interests increased over this period. These empirical findings are inconsistent with a standard (and essential) assumption of theoretical principal-agent models of rate-of-return regulation, that regulators value consumers' payoffs more than utility profits. The second paper examines regulatory policy toward generating facilities that entered commercial service during the years 1983-88. In a significant departure from past practice, state public utility commissions often denied utilities full recovery of their investments in new plants. Although such ex post disallowances have an important efficiency rationale, they also provide a means for opportunistic regulators to effect transfers between utilities' ratepayers and shareholders. A probit model was used to assess the impact on the probability of a disallowance of firm and project characteristics as well as attributes of a state's political and institutional environment

  1. TAN Hot Shop and Support Facility Utilization Study

    Energy Technology Data Exchange (ETDEWEB)

    Picker, B.A.

    2001-11-16

    Impacts to the U.S. Department of Energy (DOE) complex caused by early closure (prior to 2018) and Demolition and Dismantlement (D and D) of the Test Area North (TAN) hot shop and its support facilities are explored in this report. Various possible conditions, such as Standby, Safe Store and Lay-up, that the facility may be placed in prior to eventually being turned over to D and D are addressed. The requirements, impacts, and implications to the facility and to the DOE Complex are discussed for each condition presented in the report. Some details of the report reference the Idaho National Engineering and Environmental Laboratory (INEEL) Spent Nuclear Fuel Life Cycle Baseline Plan, the INEEL 2000 Infrastructure Long Range Plan, and other internal INEEL reports.

  2. TAN HOT SHOP AND SUPPORT FACILITY UTILIZATION STUDY

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, Ken Crawforth

    2001-11-01

    Impacts to the U.S. Department of Energy (DOE) complex caused by early closure (prior to 2018) and Demolition and Dismantlement (D&D) of the Test Area North (TAN) hot shop and its support facilities are explored in this report. Various possible conditions, such as Standby, Safe Store and Lay-up, that the facility may be placed in prior to eventually being turned over to D&D are addressed. The requirements, impacts, and implications to the facility and to the DOE Complex are discussed for each condition presented in the report. Some details of the report reference the Idaho National Engineering and Environmental Laboratory (INEEL) Spent Nuclear Fuel Life Cycle Baseline Plan, the INEEL 2000 Infrastructure Long Range Plan, and other internal INEEL reports.

  3. Access and utilization of water and sanitation facilities and their ...

    African Journals Online (AJOL)

    Elias Nyanza;ola

    This study was conducted to determine the access, utilization and determinants ... Results: A total of 175 households participated in the study. ..... et al., 2013; Mukoonyo et al., 2007) it is among the first studies to contribute to the evidence base.

  4. Determinants Of Poor Utilization Of Orthodox Health Facilities In A ...

    African Journals Online (AJOL)

    Large volume of work was disliked by 93.2w% and being addressed by fist name was cherished by 89.8% of the respondents. Lack of guidance in moving round some was of the facilities was highlighted by 58.9%, while financial difficulty was experienced by 50.6% of respondents. Conclusion: Development of community ...

  5. Electric utility strategies and the emerging industry structure - Part 1

    International Nuclear Information System (INIS)

    Motupalli, S.

    1991-01-01

    The electric utility industry is our most capital intensive industry by far. Over the past few decades, socioeconomic and technological forces have been quietly revolutionizing the way the industry conducts itself. During the 1980s, these changes have been particularly intense, often catching both regulators and regulated ill-prepared to develop effective and profitable strategies to deal with such change. Much has already been written about these changes: independent power producers, competitive procurement of resources, incentive-based regulation, the benefits of affiliated company structures, mergers and consolidation, customer energy conservation, and marketing strategy development are all currently highly popular article and seminar topics. The author's object in this two-part series is to facilitate development of a decision framework to put these various changes in perspective, to help develop effective strategies through better focused and equipped planning methodologies. Gaining an understanding of the role, strengths and weaknesses of the various players in an industry and the structural constraints in which they operate is a necessary precursor to developing effective operating strategies to deal with change or to manipulate industry forces in your favor. Michael Port's popular five forces model provides a convenient way to develop such an understanding. It provides a way to map the industry forces driving profitability, through a review of the strengths, weaknesses and leverage of: current industry players, suppliers to the industry, customers for the industry's product, new entrants into the market, and substitute products providing equal or better value. Part 1 of this series reviews each of these five forces along some key dimensions to determine their direction of change or influence, and whether this change impacts a utility's competitive position favorably or unfavorably

  6. Load Forecasting in Electric Utility Integrated Resource Planning

    Energy Technology Data Exchange (ETDEWEB)

    Carvallo, Juan Pablo [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Larsen, Peter H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sanstad, Alan H [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Goldman, Charles A. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-07-19

    Integrated resource planning (IRP) is a process used by many vertically-integrated U.S. electric utilities to determine least-cost/risk supply and demand-side resources that meet government policy objectives and future obligations to customers and, in many cases, shareholders. Forecasts of energy and peak demand are a critical component of the IRP process. There have been few, if any, quantitative studies of IRP long-run (planning horizons of two decades) load forecast performance and its relationship to resource planning and actual procurement decisions. In this paper, we evaluate load forecasting methods, assumptions, and outcomes for 12 Western U.S. utilities by examining and comparing plans filed in the early 2000s against recent plans, up to year 2014. We find a convergence in the methods and data sources used. We also find that forecasts in more recent IRPs generally took account of new information, but that there continued to be a systematic over-estimation of load growth rates during the period studied. We compare planned and procured resource expansion against customer load and year-to-year load growth rates, but do not find a direct relationship. Load sensitivities performed in resource plans do not appear to be related to later procurement strategies even in the presence of large forecast errors. These findings suggest that resource procurement decisions may be driven by other factors than customer load growth. Our results have important implications for the integrated resource planning process, namely that load forecast accuracy may not be as important for resource procurement as is generally believed, that load forecast sensitivities could be used to improve the procurement process, and that management of load uncertainty should be prioritized over more complex forecasting techniques.

  7. Commercial statistical bulletin of the Brazilian electric utility Centrais Eletricas de Santa Catarina S.A

    International Nuclear Information System (INIS)

    1996-04-01

    Statistical data concerning the Brazilian Centrais Eletricas de Santa Catarina S.A. utility relative to April 1996 are presented. They include, among other things, electricity consumption, number and class of consumers and electricity rates

  8. Contracts on electric power supply set up between communities (communal associations, countries) and public electricity utilities

    Energy Technology Data Exchange (ETDEWEB)

    Hedrich, B

    1976-01-01

    There is not any original communal right to energy supply for the population. The affiliation of local power supply to the local administration cannot be justified either by the public purpose of service or by the term provision of existence. The utilities do not get a communal license when getting the so-called licensing contract. According to its legal nature, the licensing contract is a mixture of legal positions composed of elements of the civil law and the public law. (Administrative lawsuit). The so-called power supply contract is a mutual legal relationship under civil law on the utilization of electric power, made to last. (Permanent obligation for utilization). When concluding both contracts, it is a matter of economic activities undertaken by the communities. Fiscal considerations are in the foreground. Legal regulations concerning roads and distances and serving as starting points for concluding a licensing contract are alien to the system and are to be abolished. Communities should only be responsible for local energy supply on a basis under public law. In lieu of it a stronger obligation to be met by large utilities ought to be ensured by ties under public law.

  9. Gas supply planning for new gas-fired electricity generation facilities

    International Nuclear Information System (INIS)

    Slocum, J.C.

    1990-01-01

    This paper explores several key issues in gas supply planning for new gas fired electric generation facilities. This paper will have two main sections, as follows: developing the gas supply plan for a gas-fired electricity generation facility and exploring key gas supply contract pricing issues

  10. National Maglev initiative: California line electric utility power system requirements

    Science.gov (United States)

    Save, Phil

    1994-01-01

    The electrical utility power system requirements were determined for a Maglev line from San Diego to San Francisco and Sacramento with a maximum capacity of 12,000 passengers an hour in each direction at a speed of 300 miles per hour, or one train every 30 seconds in each direction. Basically the Maglev line requires one 50-MVA substation every 12.5 miles. The need for new power lines to serve these substations and their voltage levels are based not only on equipment loading criteria but also on limitations due to voltage flicker and harmonics created by the Maglev system. The resulting power system requirements and their costs depend mostly on the geographical area, urban or suburban with 'strong' power systems, or mountains and rural areas with 'weak' power systems. A reliability evaluation indicated that emergency power sources, such as a 10-MW battery at each substation, were not justified if sufficient redundancy is provided in the design of the substations and the power lines serving them. With a cost of $5.6 M per mile, the power system requirements, including the 12-kV DC cables and the inverters along the Maglev line, were found to be the second largest cost component of the Maglev system, after the cost of the guideway system ($9.1 M per mile), out of a total cost of $23 M per mile.

  11. A NOx control regulation for electric utility boilers in California

    International Nuclear Information System (INIS)

    Price, D.R.

    1992-01-01

    The reduction of oxides of nitrogen emissions is becoming an increasingly important part of ozone attainment plans. As a part of its ozone attainment plan, the Ventura County (California) Air Pollution Control Board adopted in June, 1991, a regulation (Rule 59) to limit oxides of nitrogen emissions from four electrical utility boilers in the county. Rule development took two years and involved considerable public input. The emission limit for each of two 750 megawatt units is set at 0.10 pounds of NO x per megawatt-hour net after June, 1994. The emission limit for each of two 215 megawatt units is 0.20 pounds of NO x per megawatt-hour after June, 1996. Additional limitations are included for fuel oil operation. The rule does not specify an emission control technology. Conventional selective catalytic reduction, urea injection and combustion modifications are considered the technologies most likely to be used to comply. At $17,613 per ton of NO x reduced for the two large boilers and $8.992 per ton of NO x reduced for the small boilers, the rule is considered cost effective. The capital cost for conventional selective catalytic reduction systems on all four boilers is expected to be in excess of $210,000,000

  12. Financial statistics of major US investor-owned electric utilities 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    The Financial Statistics of Major U.S. Investor-Owned Electric Utilities publication presents summary and detailed financial accounting data on the investor-owned electric utilities. The objective of the publication is to provide Federal and State Governments, industry, and the general public with current and historical data that can be used for making policy and decisions relating to investor-owned electric utility issues.

  13. Financial statistics of major U.S. investor-owned electric utilities 1993

    Energy Technology Data Exchange (ETDEWEB)

    1995-01-01

    The Financial Statistics of Major US Investor-Owned Electric Utilities publication presents summary and detailed financial accounting data on the investor-owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decisionmaking purposes related to investor-owned electric utility issues.

  14. Why do electricity utilities cooperate with coal suppliers? A theoretical and empirical analysis from China

    International Nuclear Information System (INIS)

    Zhao Xiaoli; Lyon, Thomas P.; Wang Feng; Song Cui

    2012-01-01

    The asymmetry of Chinese coal and electricity pricing reforms leads to serious conflict between coal suppliers and electricity utilities. Electricity utilities experience significant losses as a result of conflict: severe coal price fluctuations, and uncertainty in the quantity and quality of coal supplies. This paper explores whether establishing cooperative relationships between coal suppliers and electricity utilities can resolve conflicts. We begin with a discussion of the history of coal and electricity pricing reforms, and then conduct a theoretical analysis of relational contracting to provide a new perspective on the drivers behind the establishment of cooperative relationships between the two parties. Finally, we empirically investigate the role of cooperative relationships and the establishment of mine-mouth power plants on the performance of electricity utilities. The results show that relational contracting between electricity utilities and coal suppliers improves the market performance of electricity utilities; meanwhile, the transportation cost savings derived from mine-mouth power plants are of importance in improving the performance of electricity utilities. - Highlights: ► We discuss the history of coal and electricity pricing reforms. ► The roots of conflicts between electricity and coal firms are presented. ► We conduct a theoretical analysis of relational contracting. ► The role of mine-mouth power plants on the performance of power firms is examined.

  15. Access and utilization of water and sanitation facilities and their ...

    African Journals Online (AJOL)

    Introduction: Lack of safe water, sanitation and hygiene remains one of the most pressing global health issues of our time. Water and sanitation-related improvements are crucial in meeting the Global Sustainable Development Goals. This study was conducted to determine the access, utilization, and determinants of access ...

  16. Availability and utilization of internet facilities by users in Federal ...

    African Journals Online (AJOL)

    This paper examined the availability and utilization of internet services at the Federal Colleges of Education (FCE) library of Adamawa, Gombe and Yobe States. Four objectives and four research questions guided the study. The study was limited to FCE Adamawa, Gombe and Yobe State Library. Survey research design ...

  17. Methods for detecting and locating leaks in containment facilities using electrical potential data and electrical resistance tomographic imaging techniques

    Science.gov (United States)

    Daily, William D.; Laine, Daren L.; Laine, Edwin F.

    1997-01-01

    Methods are provided for detecting and locating leaks in liners used as barriers in the construction of landfills, surface impoundments, water reservoirs, tanks, and the like. Electrodes are placed in the ground around the periphery of the facility, in the leak detection zone located between two liners if present, and/or within the containment facility. Electrical resistivity data is collected using these electrodes. This data is used to map the electrical resistivity distribution beneath the containment liner between two liners in a double-lined facility. In an alternative embodiment, an electrode placed within the lined facility is driven to an electrical potential with respect to another electrode placed at a distance from the lined facility (mise-a-la-masse). Voltage differences are then measured between various combinations of additional electrodes placed in the soil on the periphery of the facility, the leak detection zone, or within the facility. A leak of liquid though the liner material will result in an electrical potential distribution that can be measured at the electrodes. The leak position is located by determining the coordinates of an electrical current source pole that best fits the measured potentials with the constraints of the known or assumed resistivity distribution.

  18. Analysis of electric vehicle impacts in New Mexico urban utility distribution infrastructure.

    Energy Technology Data Exchange (ETDEWEB)

    Arellano, B. [Public Utility Service Company of New Mexico, Albuquerque, NM (United States); Sena, Santiago [Univ. of New Mexico, Albuquerque, NM (United States); Lavrova, Olga [Univ. of New Mexico, Albuquerque, NM (United States); Stratton, S. [Public Utility Service Company of New Mexico, Albuquerque, NM (United States); Abdollahy, S. [Univ. of New Mexico, Albuquerque, NM (United States); Hawkins, J. [Public Utility Service Company of New Mexico, Albuquerque, NM (United States)

    2013-06-16

    Modeling is going to play a crucial role for utilities as Electric Vehicle (EV) ownership percentage increases. Utilities anticipate new demand peaks due to EV charging loads, particularly at high penetration levels.

  19. Report on progress of researches by common utilization of JAERI nuclear facilities, for fiscal 1992

    International Nuclear Information System (INIS)

    1993-08-01

    The results of the joint researches by utilizing the facilities of JAERI in 1992 fiscal year were summarized. The number of research themes in 1992 was 247 cases. In this book, 166 reports are collected. (J.P.N.)

  20. Report on progress of researches by common utilization of JAERI nuclear facilities, for fiscal 1993

    International Nuclear Information System (INIS)

    1994-07-01

    The results of the joint researches by utilizing the facilities of JAERI in 1993 fiscal year were summarized. The number of research themes in 1993 was 228 cases. In this book, 243 reports are collected. (J.P.N.)

  1. Forecasting Day-Ahead Electricity Prices : Utilizing Hourly Prices

    NARCIS (Netherlands)

    E. Raviv (Eran); K.E. Bouwman (Kees); D.J.C. van Dijk (Dick)

    2013-01-01

    textabstractThe daily average price of electricity represents the price of electricity to be delivered over the full next day and serves as a key reference price in the electricity market. It is an aggregate that equals the average of hourly prices for delivery during each of the 24 individual

  2. Approaches to Electric Utility Energy Efficiency for Low Income Customers in a Changing Regulatory Environment

    Energy Technology Data Exchange (ETDEWEB)

    Brockway, N.

    2001-05-21

    As the electric industry goes through a transformation to a more market-driven model, traditional grounds for utility energy efficiency have come under fire, undermining the existing mechanisms to fund and deliver such services. The challenge, then, is to understand why the electric industry should sustain investments in helping low-income Americans use electricity efficiently, how such investments should be made, and how these policies can become part of the new electric industry structure. This report analyzes the opportunities and barriers to leveraging electric utility energy efficiency assistance to low-income customers during the transition of the electric industry to greater competition.

  3. Analysis of Department of Defense Organic Depot Maintenance Capacity Management and Facility Utilization Factors

    Science.gov (United States)

    1991-09-01

    System ( CAPMS ) in lieu of using DODI 4151.15H. Facility utilization rate computation is not explicitly defined; it is merely identified as a ratio of...front of a bottleneck buffers the critical resource and protects against disruption of the system. This approach optimizes facility utilization by...run titled BUFFERED BASELINE. Three different levels of inventory were used to evaluate the effect of increasing the inventory level on critical

  4. Report on progress of researches by common utilization of JAERI nuclear facilities, for fiscal 1988

    International Nuclear Information System (INIS)

    1989-01-01

    In 1988, this system called 'Common utilization of JAERI facilities' so far was changed to 'Joint research utilizing JAERI facilities', and by evaluating more positively the function of the General Research Center for Nuclear Energy, it has been emphasized to promote and coordinate the joint research among universities centering around the utilization of JAERI facilities. The total number of the research subjects in fiscal year 1988 reached 138, but the results of 120 of them are collected in this book. General joint research is the standard form of the utilization of various facilities that JAERI has opened to common utilization. Cooperation research is to be carried out by concluding research cooperation contracts between university researchers and JAERI researchers, and the facilities which are not opened to common utilization can be used. In the general joint research, the utilization of irradiation such as activation analysis, radiochemistry, irradiation effect, neutron diffraction and so on and the research using beams are mostly carried out, but in the cooperation research, reactor engineering, reactor materials,, nuclear physics measurement and so on are the main subjects. The total number of visitors in one year was 3829 man-day. (K.I.)

  5. Forecasting Day-Ahead Electricity Prices: Utilizing Hourly Prices

    OpenAIRE

    Raviv, Eran; Bouwman, Kees E.; van Dijk, Dick

    2013-01-01

    This discussion paper led to a publication in 'Energy Economics' , 2015, 50, 227-239. The daily average price of electricity represents the price of electricity to be delivered over the full next day and serves as a key reference price in the electricity market. It is an aggregate that equals the average of hourly prices for delivery during each of the 24 individual hours. This paper demonstrates that the disaggregated hourly prices contain useful predictive information for the daily average ...

  6. Outlook for gas turbine plant utilization in htgr power facilities

    International Nuclear Information System (INIS)

    Beknev, V.S.; Leont'ev, A.I.; Shmidt, K.L.; Surovtsev, I.G.

    1983-01-01

    The nuclear reactor power plants that have found greatest favor in the nuclear power industry worldwide are pressurized water reactors, boiling-water reactors, and uranium-graphite channel reactors with saturated-steam steam turbine units (PTU). The efficiency of power generating stations built around reactors such as these does not exceed 30 to 32%, and furthermore they are ''tied down'' to water reservoirs, with the entailed severe thermal effects on the environmental surroundings. The low efficiency range cited is evidence of inefficacious utilization of the nuclear fuel, reserves of which have their limits just as there are limits to available reserves of fossil fuels. Forecasts are being floated of a possible uranium crisis (profitable mining of uranium) in the mid-1990's, even with the expected development of breeder reactors to bridge the gap

  7. Financial statistics of major US investor-owned electric utilities 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-28

    The Financial Statistics of Major US Investor-Owned Electric Utilities publication presents summary and detailed financial accounting data on the investor-owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decisionmaking purposes related to investor-owned electric utility issues. The Financial Statistics of Major US Investor-Owned Electric Utilities publication provides information about the financial results of operations of investor-owned electric utilities for use by government, industry, electric utilities, financial organizations and educational institutions in energy planning. In the private sector, the readers of this publication are researchers and analysts associated with the financial markets, the policymaking and decisionmaking members of electric utility companies, and economic development organizations. Other organizations that may be interested in the data presented in this publication include manufacturers of electric power equipment and marketing organizations. In the public sector, the readers of this publication include analysts, researchers, statisticians, and other professionals engaged in regulatory, policy, and program areas. These individuals are generally associated with the Congress, other legislative bodies, State public utility commissions, universities, and national strategic planning organizations.

  8. Security Vulnerability and Patch Management in Electric Utilities: A Data-Driven Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Li, Qinghua [Univ. of Arkansas, Fayetteville, AR (United States); Zhang, Fengli [Univ. of Arkansas, Fayetteville, AR (United States)

    2018-01-18

    This paper explores a real security vulnerability and patch management dataset from an electric utility in order to shed light on characteristics of the vulnerabilities that electric utility assets have and how they are remediated in practice. Specifically, it first analyzes the distribution of vulnerabilities over software, assets, and other metric. Then it analyzes how vulnerability features affect remediate actions.

  9. Challenges for utilization of the new synchrotron facilities

    International Nuclear Information System (INIS)

    Attwood, D.

    1989-08-01

    The emergence of third generation synchrotron radiation facilities provides new scientific opportunities and challenges. Optimized for small phase space electron beams, long periodic magnet structures, and dedicated scientific user access -- these new machines promise significant increases in spectral brightness, as well as enhanced spatial and temporal coherence properties, which translates to new opportunities for combining high spatial and spectral resolution. The challenges to the machine builders are well known: designing and maintaining the small phase space beams, constructing long magnet structures with minimal errors, stabilizing the beam to long and short term fluctuations, and multiple undulator tuning, to name a few. The challenges in beamline optics, spectroscopic and focusing systems are also quite clear. The issue of optical stability quickly comes to the forefront as we attempt to focus and image to ever finer spatial scales, with minimal loss of photon flux. Surface figure and polish are of greater importance, as is minimization of aberrations, as we strive to maintain these small phase space photon beams. The higher intensities and power loading mandate cooled, or cleverly controlled optics, to avoid thermal distortion. Spectroscopic efficiency, with minimal wavefront distortion to the near diffraction limited radiation, becomes more important, as do order and harmonic suppression resolution are called for -- with both diffractive and reflective optics. Two of our major issues will be efficient time sharing of these valuable resources, relegating time consuming setup procedures to branch lines while others take data, and controlling the cost of these ever more complex beamline engineering systems. 12 refs., 6 figs., 8 tabs

  10. Report on progress of researches by common utilization of JAERI nuclear facilities, for fiscal 1982

    International Nuclear Information System (INIS)

    1983-01-01

    The utilization of the facilities in the Japan Atomic Energy Research Institute in common in 1982 has finished in active state, and the results of the researches have reached the stage of publication. The subjects of the researches spread over wide fields, and in 1982 also, extremely diversified researches were carried out. In this report, theses results were collected in one book, and it is desirable to utilize it actively. The number of the research themes is 131. In the field of general researches, the researches on radiochemistry, the utilization of radiation and the effects of irradiation were mostly carried out, while in cooperative researches, the researches were mainly concerned with nuclear reactor engineering and nuclear reactor materials. The total number of visitors was 3025. The facilities offered to the common utilization were JRR-2, JRR-3, JRR-4, Co-60 irradiation facility and others. The abstracts of the papers are reported. (J.P.N.)

  11. Financial statistics of major U.S. publicly owned electric utilities 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    The 1997 edition of the ``Financial Statistics of Major U.S. Publicly Owned Electric Utilities`` publication presents 5 years (1993 through 1997) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decisionmaking purposes related to publicly owned electric utility issues. Generator (Tables 3 through 11) and nongenerator (Tables 12 through 20) summaries are presented in this publication. Five years of summary financial data are provided (Tables 5 through 11 and 14 through 20). Summaries of generators for fiscal years ending June 30 and December 31, nongenerators for fiscal years ending June 30 and December 31, and summaries of all respondents are provided in Appendix C. The composite tables present aggregates of income statement and balance sheet data, as well as financial indicators. Composite tables also display electric operation and maintenance expenses, electric utility plant, number of consumers, sales of electricity, operating revenue, and electric energy account data. The primary source of publicly owned financial data is the Form EIA-412, ``Annual Report of Public Electric Utilities.`` Public electric utilities file this survey on a fiscal year basis, in conformance with their recordkeeping practices. The EIA undertook a review of the Form EIA-412 submissions to determine if alternative classifications of publicly owned electric utilities would permit the inclusion of all respondents. The review indicated that financial indicators differ most according to whether or not a publicly owned electric utility generates electricity. Therefore, the main body of the report provides summary information in generator/nongenerator classifications. 2 figs., 101 tabs.

  12. Financial statistics of major U.S. publicly owned electric utilities 1997

    International Nuclear Information System (INIS)

    1998-12-01

    The 1997 edition of the ''Financial Statistics of Major U.S. Publicly Owned Electric Utilities'' publication presents 5 years (1993 through 1997) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decisionmaking purposes related to publicly owned electric utility issues. Generator (Tables 3 through 11) and nongenerator (Tables 12 through 20) summaries are presented in this publication. Five years of summary financial data are provided (Tables 5 through 11 and 14 through 20). Summaries of generators for fiscal years ending June 30 and December 31, nongenerators for fiscal years ending June 30 and December 31, and summaries of all respondents are provided in Appendix C. The composite tables present aggregates of income statement and balance sheet data, as well as financial indicators. Composite tables also display electric operation and maintenance expenses, electric utility plant, number of consumers, sales of electricity, operating revenue, and electric energy account data. The primary source of publicly owned financial data is the Form EIA-412, ''Annual Report of Public Electric Utilities.'' Public electric utilities file this survey on a fiscal year basis, in conformance with their recordkeeping practices. The EIA undertook a review of the Form EIA-412 submissions to determine if alternative classifications of publicly owned electric utilities would permit the inclusion of all respondents. The review indicated that financial indicators differ most according to whether or not a publicly owned electric utility generates electricity. Therefore, the main body of the report provides summary information in generator/nongenerator classifications. 2 figs., 101 tabs

  13. Determining the Cost of Capital for Turkish Electricity Distribution Utilities: Analysis and Recommendations

    OpenAIRE

    Gözen, Mustafa

    2012-01-01

    Turkey has been transforming her electricity market to a competitive one since the electricity market law was approved by the parliament in 2001. As part of the new regime, electricity distribution activities are subject to incentive-based regulation by the energy regulator - EMRA. At the beginning of each implementation period, initial revenue is allowed by EMRA for a distribution utility in which a rate of return for investments in the utility is added. Setting a fair rate is relatively eas...

  14. Diesel Engine Waste Heat Recovery Utilizing Electric Turbocompound Technology

    International Nuclear Information System (INIS)

    Gerke, Frank G.

    2001-01-01

    This cooperative program between the DOE Office of Heavy Vehicle Technology and Caterpillar, Inc. is aimed at demonstrating electric turbocompound technology on a Class 8 truck engine. This is a lab demonstration program, with no provision for on-truck testing of the system. The goal is to demonstrate the level of fuel efficiency improvement attainable with the electric turbocompound system. Also, electric turbocompounding adds an additional level of control to the air supply which could be a component in an emissions control strategy

  15. Optimal utilization of electric power in the Nordic countries

    International Nuclear Information System (INIS)

    Magnusson, G.; Gjelsvik, E.

    1992-01-01

    It is attempted to address the questions of which advantages the equilibrium solution would have for the energy market under free trade conditions, how Nordic electric power can be used optimally and what the trading pattern looks like, which kind of competition the transmission of electricity via cables to Iceland and other Nordic countries will meet in the United Kingdom (UK) and the Continent, how high the option values are of trading with electric power via cables from, for example, Iceland to the UK and how great the profit could be from a more effective use of electricity for aluminium production in Norway and Iceland. Data are given on consumer prices for 1990 in Scandinavia, Germany and the UK, and a few graphs and a map illustrate the text. (AB)

  16. Utilization of waste heat from electricity generating stations

    International Nuclear Information System (INIS)

    Robertson, R.F.S.

    1977-06-01

    Historically the nuclear power station has been designed solely as an electricity producer. But in Canada today only 15 percent of our energy consumption is as electricity. The non-electrical needs today are supplied almost entirely by natural gas and oil. There is an incentive to see whether a nuclear station could supply energy for some of these non-electrical needs, thus freeing gas and oil for uses for which they may be more valuable and suitable, especially in transportation. A group located at the Whiteshell Nuclear Research Establishment undertook a series of studies to examine this problem. These studies were done in sufficient depth to provide technological and economic answers, and as a result several reports have been published on various topics. In this report, the findings from these studies are drawn together in an assessment of the potential in Canada for using waste heat. (author)

  17. Treatment of Solar Generation in Electric Utility Resource Planning

    Energy Technology Data Exchange (ETDEWEB)

    Sterling, J.; McLaren, J.; Taylor, M.; Cory, K.

    2013-10-01

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. State and federal support policies, solar photovoltaic (PV) price declines, and the introduction of new business models for solar PV 'ownership' are leading to increasing interest in solar technologies (especially PV); however, solar introduces myriad new variables into the utility resource planning decision. Most, but not all, utility planners have less experience analyzing solar than conventional generation as part of capacity planning, portfolio evaluation, and resource procurement decisions. To begin to build this knowledge, utility staff expressed interest in one effort: utility exchanges regarding data, methods, challenges, and solutions for incorporating solar in the planning process. Through interviews and a questionnaire, this report aims to begin this exchange of information and capture utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  18. Assessment Of The Availability, Utilization And Management Of ICT Facilities In Teaching English Language In Secondary Schools In Kaduna State, Nigeria

    Directory of Open Access Journals (Sweden)

    Hanna Onyi Yusuf

    2013-01-01

    Full Text Available The study investigated the availability, utilization and management of ICT facilities in teaching English language in secondary schools in Kaduna State, Nigeria. The study adopted a descriptive survey research design. A questionnaire titled “Availability, Utilization and Management of Information and Communication Technology in teaching English Language in Secondary Schools” (AUMICTSS was used for data collection. Twenty randomly selected secondary schools from Kaduna metropolis were used for the study. A total of 100 teachers participated by responding to the items on the questionnaire. The data collected was analysed using frequencies and percentages. The findings of the study revealed that there is a dearth of ICT facilities in secondary schools in Kaduna as there are only very few of such facilities available in most of the schools visited. It also revealed that most teachers were not competent in the use of these facilities as the management of these facilities requires training and re-training. It was recommended as a matter of urgency that government should provide more ICT facilities in schools and ensure the provision of electricity in every secondary school for optimal utilization of these facilities. Teachers should equally be trained and re-trained regularly in the use and management of ICT facilities for effective English Language curriculum delivery.

  19. Magnox Electric Littlebrook reactor inspection and repair rehearsal facility

    International Nuclear Information System (INIS)

    Barnes, S.A.; Clayton, R.; Gaydon, B.G.; Ramsey, B.H.

    1996-01-01

    Magnox reactors, although designed to be maintenance free during their operational life, have nevertheless highlighted the need for test rig facilities to train operators in the methods and techniques of reactor inspection and repair. The history of the facility for reactor engineering development (FRED) is described and its present role as a repair rehearsal facility noted. Advances in computer graphics may, in future, mean that such operator training will be virtual reality rather than analog reality based; however the need for such rigs to commission techniques and equipment and to establish performance and reliability is likely to continue. (UK)

  20. Third-quarter 1989 electric utility financial results

    International Nuclear Information System (INIS)

    Studness, C.M.

    1990-01-01

    Utility earnings per share before write-offs fell 6.9% in the third quarter of 1989 from the year-earlier level. Write-offs reduced third-quarter earnings of a sample of 83 utilities that account for 95% of investor-owned utility revenue by $792 million, compared with $183 million in the year-earlier quarter. With larger write-offs in 1989 than in 1988, third-quarter earnings per share after write-offs plunged 16.9% from the year-earlier level

  1. A Review of Avian Monitoring and Mitigation Information at Existing Utility-Scale Solar Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Walston, Leroy J. [Argonne National Lab. (ANL), Argonne, IL (United States); Rollins, Katherine E. [Argonne National Lab. (ANL), Argonne, IL (United States); Smith, Karen P. [Argonne National Lab. (ANL), Argonne, IL (United States); LaGory, Kirk E. [Argonne National Lab. (ANL), Argonne, IL (United States); Sinclair, Karin [National Renewable Energy Lab. (NREL), Golden, CO (United States); Turchi, Craig [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wendelin, Tim [National Renewable Energy Lab. (NREL), Golden, CO (United States); Souder, Heidi [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-01-01

    There are two basic types of solar energy technology: photovoltaic and concentrating solar power. As the number of utility-scale solar energy facilities using these technologies is expected to increase in the United States, so are the potential impacts on wildlife and their habitats. Recent attention is on the risk of fatality to birds. Understanding the current rates of avian mortality and existing monitoring requirements is an important first step in developing science-based mitigation and minimization protocols. The resulting information also allows a comparison of the avian mortality rates of utility-scale solar energy facilities with those from other technologies and sources, as well as the identification of data gaps and research needs. This report will present and discuss the current state of knowledge regarding avian issues at utility-scale solar energy facilities.

  2. Prediction of energy balance and utilization for solar electric cars

    Science.gov (United States)

    Cheng, K.; Guo, L. M.; Wang, Y. K.; Zafar, M. T.

    2017-11-01

    Solar irradiation and ambient temperature are characterized by region, season and time-domain, which directly affects the performance of solar energy based car system. In this paper, the model of solar electric cars used was based in Xi’an. Firstly, the meteorological data are modelled to simulate the change of solar irradiation and ambient temperature, and then the temperature change of solar cell is calculated using the thermal equilibrium relation. The above work is based on the driving resistance and solar cell power generation model, which is simulated under the varying radiation conditions in a day. The daily power generation and solar electric car cruise mileage can be predicted by calculating solar cell efficiency and power. The above theoretical approach and research results can be used in the future for solar electric car program design and optimization for the future developments.

  3. Response strategies for electric utilities to an uncertain climate

    International Nuclear Information System (INIS)

    Delcambre, J.; Wilson, O.

    1995-01-01

    The precautionary principle is being applied by legislators in formulating policy responses to the predictions of an enhanced greenhouse effect. Global commitments have been made under the Framework Convention on Climate Change to take measures aimed at stabilizing atmospheric concentrations of greenhouse gases. Electricity production from fossil fuels is a significant global source of carbon dioxide and a focus for emission reduction efforts. The decisions of policy-makers will impact on the electricity sector. However, the size and structure of this sector imply that substantial impositions cannot be placed on it in the short term without severe economic and social consequences. What is required of policy-makers is a pragmatic approach, since there are no simple or unique solutions. A rational attitude to energy use must be fostered which recognizes the special role of electricity in a modern economy

  4. Electric rate shock and the future of utility construction

    International Nuclear Information System (INIS)

    Nogee, A.J.

    1985-01-01

    How state regulators spread the costs of overbudget and, in some cases, unneeded new power plants looms as a major political and economic issue directly affecting more than a third of the nation's households and businesses. Today's local battles over rate shock have an even greater national significance because they will shape investment incentives for decades to come. In addition to mismanaged nuclear projects, most nuclear and coal plants being finished today represent excess generating capacity. Utility reserve margins averaged 34% last year instead of the 15-20% above peak demand that analysts agree is desirable. State regulators are increasingly refusing to allow utilities to include new plants in the rate base, and utilities are responding with warnings about future shortages. They may also try to reform or repeal the Holding Company Act. Utility critics point to alternatives to central plant construction with cogeneration and small power generation. 2 figures

  5. UFISA: electric facility engineering for the service of emergy market

    International Nuclear Information System (INIS)

    Gutierrez Zapico, A.

    1997-01-01

    UFISA is the engineering company with the experience of UNION ELECTRICA FENOSA S.A. It activity began in 1990. This company offers to national and international markets the services for energy consumers and for the electricity costumers. (Author)

  6. Optimal pricing of non-utility generated electric power

    International Nuclear Information System (INIS)

    Siddiqi, S.N.; Baughman, M.L.

    1994-01-01

    The importance of an optimal pricing policy for pricing non-utility generated power is pointed out in this paper. An optimal pricing policy leads to benefits for all concerned: the utility, industry, and the utility's other customers. In this paper, it is shown that reliability differentiated real-time pricing provides an optimal non-utility generated power pricing policy, from a societal welfare point of view. Firm capacity purchase, and hence an optimal price for purchasing firm capacity, are an integral part of this pricing policy. A case study shows that real-time pricing without firm capacity purchase results in improper investment decisions and higher costs for the system as a whole. Without explicit firm capacity purchase, the utility makes greater investment in capacity addition in order to meet its reliability criteria than is socially optimal. It is concluded that the non-utility generated power pricing policy presented in this paper and implied by reliability differentiated pricing policy results in social welfare-maximizing investment and operation decisions

  7. INVESTIGATION OF QUANTIFICATION OF FLOOD CONTROL AND WATER UTILIZATION EFFECT OF RAINFALL INFILTRATION FACILITY BY USING WATER BALANCE ANALYSIS MODEL

    OpenAIRE

    文, 勇起; BUN, Yuki

    2013-01-01

    In recent years, many flood damage and drought attributed to urbanization has occurred. At present infiltration facility is suggested for the solution of these problems. Based on this background, the purpose of this study is investigation of quantification of flood control and water utilization effect of rainfall infiltration facility by using water balance analysis model. Key Words : flood control, water utilization , rainfall infiltration facility

  8. Supervision of electrical and instrumentation systems and components at nuclear facilities

    International Nuclear Information System (INIS)

    1986-01-01

    The general guidelines for the supervision of nuclear facilities carried out by the Finnish Centre for Radiation and Nuclear Safety (STUK) are set forth in the guide YVL 1.1. This guide shows in more detail how STUK supervises the electrical and instrumentation systems and components of nuclear facilities

  9. The Potential and Utilization of Unused Energy Sources for Large-Scale Horticulture Facility Applications under Korean Climatic Conditions

    Directory of Open Access Journals (Sweden)

    In Tak Hyun

    2014-07-01

    Full Text Available As the use of fossil fuel has increased, not only in construction, but also in agriculture due to the drastic industrial development in recent times, the problems of heating costs and global warming are getting worse. Therefore, introduction of more reliable and environmentally-friendly alternative energy sources has become urgent and the same trend is found in large-scale horticulture facilities. In this study, among many alternative energy sources, we investigated the reserves and the potential of various different unused energy sources which have infinite potential, but are nowadays wasted due to limitations in their utilization. In addition, we utilized available unused energy as a heat source for a heat pump in a large-scale horticulture facility and analyzed its feasibility through EnergyPlus simulation modeling. Accordingly, the discharge flow rate from the Fan Coil Unit (FCU in the horticulture facility, the discharge air temperature, and the return temperature were analyzed. The performance and heat consumption of each heat source were compared with those of conventional boilers. The result showed that the power load of the heat pump was decreased and thus the heat efficiency was increased as the temperature of the heat source was increased. Among the analyzed heat sources, power plant waste heat which had the highest heat source temperature consumed the least electric energy and showed the highest efficiency.

  10. Financing the electric power utilities, especially the nuclear power in Japan

    International Nuclear Information System (INIS)

    Tajima, T.

    1975-04-01

    Electric power demands in Japan have shown a remarkable growth at an annual rate of 12% since 1965. Nine electric power companies have invested large amounts of money so far, amounting to over 1 trillion yen every year since 1972. A survey of the electric power supply system and an estimation of the electric power demands in 1980 and in 1985 are given. It is expected that the main portion of electric power in the future will gradually be generated by nuclear plants. Financial features of the electrical power utilities, the credit risk of the electric power utilities, and the raising of funds by electric power utilities are discussed. It is concluded that it will be necessary (1) to expand the capital market, (2) to enable the electric power companies to issue a sufficient amount of bonds, (3) to make the Government financing institutions, such as the Japan Development Bank, provide the electric power companies with larger funds on a long-term and low-interest rate basis, and (4) even to take such drastic steps as subsidizing interest on private loans to the electric power companies. (B.P.)

  11. Exploring utility organization electricity generation, residential electricity consumption, and energy efficiency: A climatic approach

    International Nuclear Information System (INIS)

    Craig, Christopher A.; Feng, Song

    2017-01-01

    Highlights: • Study examined impact of electricity fuel sources and consumption on emissions. • 97.2% of variability in emissions explained by coal and residential electricity use. • Increasing cooling degree days significantly related to increased electricity use. • Effectiveness of state-level energy efficiency programs showed mixed results. - Abstract: This study examined the impact of electricity generation by fuel source type and electricity consumption on carbon emissions to assess the role of climatic variability and energy efficiency (EE) in the United States. Despite high levels of greenhouse gas emissions, residential electricity consumption continues to increase in the United States and fossil fuels are the primary fuel source of electricity generation. 97.2% of the variability in carbon emissions in the electricity industry was explained by electricity generation from coal and residential electricity consumption. The relationships between residential electricity consumption, short-term climatic variability, long-term climatic trends, short-term reduction in electricity from EE programs, and long-term trends in EE programs was examined. This is the first study of its nature to examine these relationships across the 48 contiguous United States. Inter-year and long-term trends in cooling degree days, or days above a baseline temperature, were the primary climatic drivers of residential electricity consumption. Cooling degree days increased across the majority of the United States during the study period, and shared a positive relationship with residential electricity consumption when findings were significant. The majority of electricity reduction from EE programs was negatively related to residential electricity consumption where findings were significant. However, the trend across the majority of states was a decrease in electricity reduction from EE while residential electricity consumption increased. States that successfully reduced consumption

  12. Utilization of hydrogen gas production for electricity generation in ...

    African Journals Online (AJOL)

    Lecturer

    2012-05-03

    May 3, 2012 ... The main goals of this research were to use E. aerogenes ADH-43 for fermentation in order to decide the best carbon sources and ... by converting to electricity using fuel cells in 50 ml vial bottle, 2% total ... evolution compared with other biological hydrogen .... Erlenmeyer containing a solution of Ca (OH) 2.

  13. Utilization of hydrogen gas production for electricity generation in ...

    African Journals Online (AJOL)

    Lecturer

    2012-05-03

    % total sugar concentration of sugar ... 107 cfu/ml, pH was nearly constant at 6.0, and finally the H2 was drifted to fuel cell to generate electrical power until 4 V ..... hybrid system, reverse micelles and by metabolic engi- neering.

  14. The fast reactor and electricity supply, a utility view

    International Nuclear Information System (INIS)

    Wright, J.K.; Hall, R.S.; Kemmish, W.B.; Thorne, R.T.

    1982-01-01

    The significance of the fast reactor is discussed from the viewpoint of the Central Electricity Generating Board. The need for the fast reactor and a possible timescale for its introduction are examined. It is emphasised that demonstration of the commercial and environmental acceptability of the fuel cycle will be needed before any commitment can be made to fast reactors. (U.K.)

  15. Validity and Utilization of the Out-Pile Testing Facilities at HANARO

    International Nuclear Information System (INIS)

    Choo, Kee-Nam; Cho, Man-Soon; Yang, Sung-Woo; Shin, Yoon-Taek; Park, Seng-Jae; Jun, Byung-Hyuk; Kim, Myong-Seop

    2016-01-01

    Various neutron irradiation facilities such as rabbit irradiation facilities, loop facilities and the capsule irradiation facilities for irradiation tests of nuclear materials, fuels and radioisotope products have been developed at HANARO. Among these irradiation facilities, the capsule is the most useful device for coping with the various test requirements at HANARO. To support the national research and development programs on nuclear reactors and the nuclear fuel cycle technology in Korea, new irradiation capsules have been developed and actively utilized for the irradiation tests requested by numerous users. The environmental conditions for these reactors are generally beyond present day reactor technology, especially regarding the higher neutron fluence and higher operating temperature. To effectively support the national R and Ds relevant to the future nuclear systems, the development of advanced irradiation technologies concerning higher neutron fluence and irradiation temperature are being preferentially developed at HANARO. The utilization of the out-pile testing facilities to satisfy the criteria of safety evaluation for a new device installed in the core of HANARO was summarized. In addition, the validity of the out-pile testing facilities was evaluated and proved to be effective for verifying the integrity of irradiation capsule

  16. Validity and Utilization of the Out-Pile Testing Facilities at HANARO

    Energy Technology Data Exchange (ETDEWEB)

    Choo, Kee-Nam; Cho, Man-Soon; Yang, Sung-Woo; Shin, Yoon-Taek; Park, Seng-Jae; Jun, Byung-Hyuk; Kim, Myong-Seop [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Various neutron irradiation facilities such as rabbit irradiation facilities, loop facilities and the capsule irradiation facilities for irradiation tests of nuclear materials, fuels and radioisotope products have been developed at HANARO. Among these irradiation facilities, the capsule is the most useful device for coping with the various test requirements at HANARO. To support the national research and development programs on nuclear reactors and the nuclear fuel cycle technology in Korea, new irradiation capsules have been developed and actively utilized for the irradiation tests requested by numerous users. The environmental conditions for these reactors are generally beyond present day reactor technology, especially regarding the higher neutron fluence and higher operating temperature. To effectively support the national R and Ds relevant to the future nuclear systems, the development of advanced irradiation technologies concerning higher neutron fluence and irradiation temperature are being preferentially developed at HANARO. The utilization of the out-pile testing facilities to satisfy the criteria of safety evaluation for a new device installed in the core of HANARO was summarized. In addition, the validity of the out-pile testing facilities was evaluated and proved to be effective for verifying the integrity of irradiation capsule.

  17. An economic and legal perspective on electric utility transition costs

    Energy Technology Data Exchange (ETDEWEB)

    Rose, K.

    1996-07-01

    The issue of possibly unrecoverable cost incurred by a utility, or `stranded costs,` has emerged as a major obstacle to developing a competitive generation market. Stranded or transition costs are defined as costs incurred by a utility to serve its customers that were being recovered in rates but are no longer due to availability of lower-priced alternative suppliers. The idea of `stranded cost,` and more importantly arguments for its recovery, is a concept with little basis in economic theory, legal precedence, or precedence in other deregulated industries. The main argument recovery is that the ``regulatory compact`` requires it. This is based on the misconception that the regulator compact is simply: the utility incurs costs on behalf of its customers because of the ``obligation to serve`` so, therefore, customers are obligated to pay. This is a mischaracterization of what the compact was and how it developed. Another argument is that recovery is required for economic efficiency. This presumes, however, a very narrow definition of efficiency based on preventing ``uneconomic`` bypass of the utility and that utilities minimize costs. A broader definition of efficiency and the likelihood of cost inefficiencies in the industry suggest that the cost imposed on customers from inhibiting competition could exceed the gains from preventing uneconomic bypass. Both these issues are examined in this paper.

  18. Demand-side management pricing options in electric utilities

    International Nuclear Information System (INIS)

    Sardana, P.; Herman, P.

    1990-01-01

    In 1989 Ontario Hydro implemented optional time-of-use (TOU) rates at the wholesale level for all municipal utilities in the province. At the same time, mandatory TOU rates were implemented for large users (customers with loads in excess of 5 MW) served by municipal utilities and Ontario Hydro's direct customers. To fully explore the potential of rate structures as demand-side management (DSM) tools, Ontario Hydro retained a consulting firm to carry out a survey of innovative rate structures in other jurisdications. The survey was intended to identify: the status quo of rate structures in other jurisdictions that were designed specifically to encourage DSM; a profile of the cost basis of the rate structures, for example whether traditional embedded cost of service analyses or contentious methods such as marginal cost pricing were used; whether innovative rates have been successful, and customer reactions and attitudes; and how innovative rates fit into the overall strategy of the utilities. It was found that TOU, interruptible and end-use targeted rates are the rate structures of choice for many utilities. Most are concerned with deferring capacity, reducing peak demand, and shifting load out of peak periods. Most utilities report success with their programs and satisfaction with the present form of the programs. 5 tabs

  19. Testing of the Engineering Model Electrical Power Control Unit for the Fluids and Combustion Facility

    Science.gov (United States)

    Kimnach, Greg L.; Lebron, Ramon C.; Fox, David A.

    1999-01-01

    The John H. Glenn Research Center at Lewis Field (GRC) in Cleveland, OH and the Sundstrand Corporation in Rockford, IL have designed and developed an Engineering Model (EM) Electrical Power Control Unit (EPCU) for the Fluids Combustion Facility, (FCF) experiments to be flown on the International Space Station (ISS). The EPCU will be used as the power interface to the ISS power distribution system for the FCF's space experiments'test and telemetry hardware. Furthermore. it is proposed to be the common power interface for all experiments. The EPCU is a three kilowatt 12OVdc-to-28Vdc converter utilizing three independent Power Converter Units (PCUs), each rated at 1kWe (36Adc @ 28Vdc) which are paralleled and synchronized. Each converter may be fed from one of two ISS power channels. The 28Vdc loads are connected to the EPCU output via 48 solid-state and current-limiting switches, rated at 4Adc each. These switches may be paralleled to supply any given load up to the 108Adc normal operational limit of the paralleled converters. The EPCU was designed in this manner to maximize allocated-power utilization. to shed loads autonomously, to provide fault tolerance. and to provide a flexible power converter and control module to meet various ISS load demands. Tests of the EPCU in the Power Systems Facility testbed at GRC reveal that the overall converted-power efficiency, is approximately 89% with a nominal-input voltage of 12OVdc and a total load in the range of 4O% to 110% rated 28Vdc load. (The PCUs alone have an efficiency of approximately 94.5%). Furthermore, the EM unit passed all flight-qualification level (and beyond) vibration tests, passed ISS EMI (conducted, radiated. and susceptibility) requirements. successfully operated for extended periods in a thermal/vacuum chamber, was integrated with a proto-flight experiment and passed all stability and functional requirements.

  20. Electric and gas utility marketing of residential energy conservation case studies

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-05-01

    The objective of this research was to obtain information about utility conservation marketing techniques from companies actively engaged in performing residential conservation services. Many utilities currently are offering comprehensive services (audits, listing of contractors and lenders, post-installation inspection, advertising, and performing consumer research). Activities are reported for the following utilities: Niagara Mohawk Power Corporation; Tampa Electric Company; Memphis Light, Gas, and Water Division; Northern States Power-Wisconsin; Public Service Company of Colorado; Arizona Public Service Company; Pacific Gas and Electric Company; Sacramento Municipal Utility District; and Pacific Power and Light Company.

  1. Electric utility power plant construction costs, 1st Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    New UDI report combines historical construction costs for more than 1,000 coal, oil, gas, nuclear and geothermal units that have entered commercial operation since 1966 and projected power plant construction costs for about 400 utility-owned generating units scheduled to enter commercial operation during the next 20 years. Key design characteristics and equipment suppliers, A/E, constructor and original installed cost data. Direct construction costs without AFUDC are provided where known. Historical construction cost data are also provided for about 130 utility-owned hydroelectric, gas turbine, combined-cycle and diesel units (these data are generally for units entering service after 1980)

  2. Report on progress of researches by common utilization of JAERI nuclear facilities, for fiscal, 1991

    International Nuclear Information System (INIS)

    1992-08-01

    The results of the joint researches by utilizing the facilities of JAERI in 1991 fiscal year were summarized, and this report was able to be completed. Many researchers in whole Japan took part in many themes, and the very significant results were obtained. Now this joint research has reached the great turnabout period. The reconstructed JRR-3M was offered for joint utilization since April, 1991, and the utilization for neutron diffraction and scattering increased largely. As for the ion irradiation facility in Takasaki Research Establishment, the partial operation will be started in the next year, and the joint utilization is expected to begin. Accompanying the diversification of the utilization of facilities, in order to properly meet the needs of users, the thorough revision of the system seems necessary. The number of research themes in 1991 was 222 cases. JRR-3M accomplished the joint utilization operation of 8 cycles as expected, but JRR-2 caused a trouble during 5th cycle, and the operation thereafter was canceled. In this book, 159 reports are collected. (K.I.)

  3. Implementing energy efficiency: Challenges and opportunities for rural electric co-operatives and small municipal utilities

    International Nuclear Information System (INIS)

    Wilson, Elizabeth J.; Plummer, Joseph; Fischlein, Miriam; Smith, Timothy M.

    2008-01-01

    Challenges in implementing demand side management (DSM) programs in rural electric co-operatives and small municipal utilities are not well understood, yet these organizations sell roughly 15% of electricity in the US, many are more coal-intensive than investor-owned utilities (IOUs), and they are politically important-rural electric co-operatives cover about 75% of the US land area and municipal utilities are found in every state except Hawaii. We provide a background on rural co-operatives and municipal utilities in the context of the US electric sector and highlight the challenges and opportunities of implementing DSM programs in these institutions. Where past studies of utility DSM have mostly focused on IOUs or consisted of qualitative case studies of municipal utilities with exemplary DSM performance, this study makes a unique contribution to the DSM literature by systematically analyzing an entire co-operative and municipal utility population in Minnesota through the use of a survey. In doing so, we provide policy recommendations relevant to energy planners and policy makers to support DSM in rural electric co-operatives and municipal utilities

  4. The effects of utility DSM programs on electricity costs and prices

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E.

    1991-11-01

    More and more US utilities are running more and larger demand-side management (DSM) programs. Assessing the cost-effectiveness of these programs raises difficult questions for utilities and their regulators. Should these programs aim to minimize the total cost of providing electric-energy services or should they minimize the price of electricity? This study offers quantitative estimates on the tradeoffs between total costs and electricity prices. This study uses a dynamic model to assess the effects of energy-efficiency programs on utility revenues, total resource costs, electricity prices, and electricity consumption for the period 1990 to 2010. These DSM programs are assessed under alternative scenarios. In these cases, fossil-fuel prices, load growth, the amount of excess capacity the utility has in 1990, planned retirements of power plants, the financial treatment of DSM programs, and the costs of energy- efficient programs vary. These analyses are conducted for three utilities: a ``base`` that is typical of US utilities; a ``surplus`` utility that has excess capacity, few planned retirements, and slow growth in fossil-fuel prices and incomes; and a ``deficit`` utility that has little excess capacity, many planned retirements, and rapid growth in fossil-fuel prices and incomes. 28 refs.

  5. The effects of utility DSM programs on electricity costs and prices

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E.

    1991-11-01

    More and more US utilities are running more and larger demand-side management (DSM) programs. Assessing the cost-effectiveness of these programs raises difficult questions for utilities and their regulators. Should these programs aim to minimize the total cost of providing electric-energy services or should they minimize the price of electricity This study offers quantitative estimates on the tradeoffs between total costs and electricity prices. This study uses a dynamic model to assess the effects of energy-efficiency programs on utility revenues, total resource costs, electricity prices, and electricity consumption for the period 1990 to 2010. These DSM programs are assessed under alternative scenarios. In these cases, fossil-fuel prices, load growth, the amount of excess capacity the utility has in 1990, planned retirements of power plants, the financial treatment of DSM programs, and the costs of energy- efficient programs vary. These analyses are conducted for three utilities: a base'' that is typical of US utilities; a surplus'' utility that has excess capacity, few planned retirements, and slow growth in fossil-fuel prices and incomes; and a deficit'' utility that has little excess capacity, many planned retirements, and rapid growth in fossil-fuel prices and incomes. 28 refs.

  6. Core business concentration vs. corporate diversification in the US electric utility industry: Synergy and deregulation effects

    International Nuclear Information System (INIS)

    Sueyoshi, Toshiyuki; Goto, Mika; Shang, Jennifer

    2009-01-01

    Many economists such as Wilson (2002) [Wilson, R., 2002. Architecture of power market, Econometrica, 70, 1299-1340] have considered that there are similarities between electricity and gas services in the US electric utility industry. Hence, they expect a synergy effect between them. However, the two businesses do not have technology similarities at the level that the gas service produces a synergy effect with electricity. To examine whether there is a synergy effect of corporate diversification in the industry, we compare electricity-specialized firms with diversified utility firms in terms of their financial performance and corporate value. The comparison indicates that core business concentration is more effective for electric utility firms than corporate diversification under the current US deregulation policy.

  7. 29 CFR 1910.302 - Electric utilization systems.

    Science.gov (United States)

    2010-07-01

    ... connect the installations to a supply of electricity; and (viii) Other outside conductors on the premises...)—Arcing parts § 1910.303(e)—Marking § 1910.303(f), except (f)(4) and (f)(5)—Disconnecting means and...)(4)—Disconnecting means and circuits—Capable of accepting a lock § 1910.303(f)(5)—Disconnecting means...

  8. Incentive Regulation and Utility Benchmarking for Electricity Network Security

    OpenAIRE

    Zhang, Y.; Nepal, R.

    2014-01-01

    The incentive regulation of costs related to physical and cyber security in electricity networks is an important but relatively unexplored and ambiguous issue. These costs can be part of cost efficiency benchmarking or, alternatively, dealt with separately. This paper discusses the issues and proposes options for incorporating network security costs within incentive regulation in a benchmarking framework. The relevant concerns and limitations associated with the accounting and classification ...

  9. How reliably can climate change and mitigation policy impacts on electric utilities be assessed?

    International Nuclear Information System (INIS)

    Dowlatabadi, H.; Kopp, R.J.; Palmer, K.; De Witt, D.

    1993-01-01

    Numerous mechanisms link climate change and electric utilities. Electricity generation releases radiatively active trace substances (RATS). Significant changes in atmospheric concentration of RATS can lead to a change in regional and global climate regimes. Mitigation action designed to prevent or limit climate change is possible through curbing emissions. Climate change and related mitigation actions impact on electric utilities. Foresight in electric utility planning requires reliable predictions of how the utilities may be affected in the decades ahead. In this paper the impacts of climate change and mitigation policies are noted, and our ability to assess these is reviewed. To this end a suite of models exploring supply and demand questions have been developed. The overall conclusion of the study is that the demand-side uncertainties dominate other unknowns and need to be better characterized and understood. (author)

  10. Value-Added Electricity Services: New Roles for Utilities and Third-Party Providers

    Energy Technology Data Exchange (ETDEWEB)

    Blansfield, J. [Inst. for Electric Innovations, Washington, DC (United States); Wood, L. [Inst. for Electric Innovations, Washington, DC (United States); Katofsky, R. [Advanced Energy Economy, Washington, DC (United States); Stafford, B. [Advanced Energy Economy, Washington, DC (United States); Waggoner, D. [Advanced Energy Economy, Washington, DC (United States); Schwartz, L. C. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-10-30

    New energy generation, storage, delivery, and end-use technologies support a broad range of value-added electricity services for retail electricity customers. Sophisticated energy management services, distributed generation coupled with storage, and electric vehicle charging are just a few examples of emerging offerings. Who should provide value-added services — utilities or third parties, or both, and under what conditions? What policy and regulatory changes may be needed to promote competition and innovation, to account for utility costs to enable these services, and to protect consumers? The report approaches the issues from three perspectives: utilities, third-party service providers, and consumers: -Jonathan Blansfield and Lisa Wood, Institute for Electric Innovation -Ryan Katofsky, Benjamin Stafford and Danny Waggoner, Advanced Energy Economy -National Association of State Utility Consumer Advocates

  11. Energy and Environment Guide to Action - Chapter 7.0: Electric Utility Policies

    Science.gov (United States)

    Focuses on the authorites that state legislatures have granted to PUCs to regulate electricity and reliability, as these authorities directly affect utilities' and customers' investments in energy efficiency, renewable energy, and CHP.

  12. Energy and Environment Guide to Action - Chapter 7: Electric Utility Policies

    Science.gov (United States)

    Focuses on the authorites that state legislatures have granted to PUCs to regulate electricity and reliability, as these authorities directly affect utilities' and customers' investments in energy efficiency, renewable energy, and CHP.

  13. 77 FR 47060 - Missouri Joint Municipal Electric Utility Commission; Notice of Filing

    Science.gov (United States)

    2012-08-07

    ... Municipal Electric Utility Commission filed a Proposed Revenue Requirement for reactive supply service under... Room in Washington, DC. There is an ``eSubscription'' link on the web site that enables subscribers to...

  14. Seismic risk analysis for General Electric Plutonium Facility, Pleasanton, California

    International Nuclear Information System (INIS)

    1978-01-01

    This report presents the results of a seismic risk analysis that focuses on all possible sources of seismic activity, with the exception of the postulated Verona Fault. The best estimate curve indicates that the Vallecitos facility will experience 30% g with a return period of roughly 130 years and 60% g with a return period of roughly 700 years

  15. A Review of Demand Forecast for Charging Facilities of Electric Vehicles

    Science.gov (United States)

    Jiming, Han; Lingyu, Kong; Yaqi, Shen; Ying, Li; Wenting, Xiong; Hao, Wang

    2017-05-01

    The demand forecasting of charging facilities is the basis of its planning and locating, which has important role in promoting the development of electric vehicles and alleviating the energy crisis. Firstly, this paper analyzes the influence of the charging mode, the electric vehicle population and the user’s charging habits on the demand of charging facilities; Secondly, considering these factors, the recent analysis on charging and switching equipment demand forecast is divided into two methods—forecast based on electric vehicle population and user traveling behavior. Then, the article analyzes the two methods and puts forward the advantages and disadvantages. Finally, in view of the defects of current research, combined with the current situation of the development of the city and comprehensive consideration of economic, political, environmental and other factors, this paper proposes an improved demand forecasting method which has great practicability and pertinence and lays the foundation for the plan of city electric facilities.

  16. Potential for increased wind-generated electricity utilization using heat pumps in urban areas

    International Nuclear Information System (INIS)

    Waite, Michael; Modi, Vijay

    2014-01-01

    Highlights: • Large-scale wind power and increased electric heat pumps were evaluated. • A deterministic model of wind power and electricity demand was developed. • Sub-models for space heating and domestic hot water demand were developed. • Increased use of heat pumps can improve the viability of large-scale wind power. • Larger wind power capacity can meet a target utilization rate with more heat pumps. - Abstract: The U.S. has substantial wind power potential, but given wind’s intermittent availability and misalignment with electricity demand profiles, large-scale deployment of wind turbines could result in high electricity costs due to energy storage requirements or low utilization rates. While fuel switching and heat pumps have been proposed as greenhouse gas (GHG) emissions and energy reduction strategies at the building scale, this paper shows that heat pump adoption could have additional system-wide benefits by increasing the utilization of wind-generated electricity. A model was developed to evaluate the effects of coupling large-scale wind power installations in New York State with increased use of electric heat pumps to meet a portion of space heating and domestic hot water (DHW) demands in New York City. The analysis showed significant increases in wind-generated electricity utilization with increased use of heat pumps, allowing for higher installed capacity of wind power. One scenario indicates that 78.5% annual wind-generated electricity utilization can be achieved with 3 GW of installed wind power capacity generated electricity equal to 20% of existing NYC annual electricity demand; if 20% of space heating and DHW demands are provided by heat pumps, the 78.5% utilization rate can be achieved with an increase of total wind power capacity to 5 GW. Therefore, this integrated supply–demand approach could provide additional system-wide emissions reductions

  17. Refresher training as an important factor affecting safety of atomic energy utilization facilities

    International Nuclear Information System (INIS)

    Kapralov, E.

    2005-01-01

    Refresher training appears to be one of the most important factors, affecting safety of atomic energy utilization facilities. To provide up-to-date refresher training programs and courses TC NRS implements best training practice based on the actual and perspective Russian national and international norms, regulations, standards and recommendations. (author)

  18. Utility industry evaluation of the metal fuel facility and metal fuel performance for liquid metal reactors

    International Nuclear Information System (INIS)

    Burstein, S.; Gibbons, J.P.; High, M.D.; O'Boyle, D.R.; Pickens, T.A.; Pilmer, D.F.; Tomonto, J.R.; Weinberg, C.J.

    1990-02-01

    A team of utility industry representatives evaluated the liquid metal reactor metal fuel process and facility conceptual design being developed by Argonne National Laboratory (ANL) under Department of Energy sponsorship. The utility team concluded that a highly competent ANL team was making impressive progress in developing high performance advanced metal fuel and an economic processing and fabrication technology. The utility team concluded that the potential benefits of advanced metal fuel justified the development program, but that, at this early stage, there are considerable uncertainties in predicting the net overall economic benefit of metal fuel. Specific comments and recommendations are provided as a contribution towards enhancing the development program. 6 refs

  19. Who cares about a financially healthy electric utility industry. Finding future answers

    International Nuclear Information System (INIS)

    O'Connor, R.J.

    1982-01-01

    Forecasts on the rate of growth of electricity supply and demand were given. Emphasis was placed on the economic stability of electric utilities and their ability to raise necessary capital. The role of nuclear power in America's future was also discussed

  20. Regulation and competition in public utilities: Electric utility management in Italy and other industrialized countries

    International Nuclear Information System (INIS)

    Fraquelli, G.

    1992-01-01

    In industrialized countries, electric power has become a vital energy resource requiring significant efforts on the part of national institutions to establish and maintain sound management and energy supply strategies. The situation in Italy reflects world trends in that electric power in this country now accounts for over one-third of total energy consumption and this percentage is expected to increase steadily through to the year 2000. This endorsement of electric power is having a strong impact on quality of life and on international relations as Italy, in order to ensure security of energy supplies, is actively pursuing of strategy of energy source and supplier diversification. With reference to recent proposals, in line with European Communities free market strategies, to deregulate the Italian electric power industry, this paper briefly analyzes the current institutional nature of ENEL (the Italian National Electricity Board) and compares the Italian electric power industry and market situation with that of Japan and the USA. The various aspects taken into consideration include investment, rate structure, quality of service, management methods and competition. An analysis is made of the most pressing difficulties currently troubling ENEL and suggestions are made as to the best courses of action to be taken

  1. Effectively utilizing NYMEX contracts for natural gas electricity futures

    International Nuclear Information System (INIS)

    Burke, L.M.

    1996-01-01

    NYMEX (New York Mercantile Exchange) is one of the United States' largest commodity exchanges. The primary role of commodity exchanges were summarized as well as the characteristics of an effective exchange. The concept of commoditization, price risk and price volatility were explained. The evolution of world and domestic regulated energy markets, the characteristics of the futures market, NYMEX electricity futures contract specifications, natural gas and crude futures contract development, and the nature of hedging were reviewed. Differences of risk management practices in cash markets and futures markets were illustrated. tabs., figs

  2. Electric utility mergers and acquisitions seen in a larger perspective

    Energy Technology Data Exchange (ETDEWEB)

    Hawes, D.W.

    1995-10-01

    Merger negotiations are intricate and sensitive dances which, far more often than not, may end in failure. The famed prediction of {open_quotes}50 in five{close_quotes} may prove correct - though it may be 50 utilities in 2005. Still, mergers are only a partial hedge against what may, after all, be 10 years of better prices for customers and tougher times for shareholders.

  3. The most important structures utilizing primary and secondary hydroenergetic potential for electric energy production

    International Nuclear Information System (INIS)

    Zacharovsky, M.

    1997-01-01

    . No wastes or pollution are produced in its utilization there are no requirements for mining facilities or capacities. Construction of HPP and their utilization bring more benefits than damages

  4. What is the most energy efficient route for biogas utilization: Heat, electricity or transport?

    International Nuclear Information System (INIS)

    Hakawati, Rawan; Smyth, Beatrice M.; McCullough, Geoffrey; De Rosa, Fabio; Rooney, David

    2017-01-01

    Highlights: •The paper developed an assessment tool for analyzing biogas utilization routes. •The LCA methodology was used to allow a uniform assessment of the biogas system. •“% energy efficiency” was used as the functional unit for assessment. •49 biogas-to-energy routes were assessed based on their final useful energy form. •The framework aids policy makers in the decision process for biogas exploitation. -- Abstract: Biogas is a renewable energy source that can be used either directly or through various pathways (e.g. upgrading to bio-methane, use in a fuel cell or conversion to liquid fuels) for heat, electricity generation or mechanical energy for transport. However, although there are various options for biogas utilization, there is limited guidance in the literature on the selection of the optimum route, and comparison between studies is difficult due to the use of different analytical frameworks. The aim of this paper was to fill that knowledge gap and to develop a consistent framework for analysing biogas-to-energy exploitation routes. The paper evaluated 49 biogas-to-energy routes using a consistent life cycle analysis method focusing on energy efficiency as the chosen crtierion. Energy efficiencies varied between 8% and 54% for electricity generation; 16% and 83% for heat; 18% and 90% for electricity and heat; and 4% and 18% for transport. Direct use of biogas has the highest efficiencies, but the use of this fuel is typically limited to sites co-located with the anaerobic digestion facility, limiting available markets and applications. Liquid fuels have the advantage of versatility, but the results show consistently low efficiencies across all routes and applications. The energy efficiency of bio-methane routes competes well with biogas and comes with the advantage that it is more easily transported and used in a wide variety of applications. The results were also compared with fossil fuels and discussed in the context of national

  5. Inefficiency persistence and heterogeneity in Colombian electricity utilities

    International Nuclear Information System (INIS)

    Galán, Jorge E.; Pollitt, Michael G.

    2014-01-01

    The electricity reform in Colombia has exhibited gains in terms of reliability but its effects on firm efficiency and service quality have not been clear. Previous studies evaluating the performance of distribution companies after the reform have not found evidence of improvements, although large differences in efficiency have been found among firms. This suggests high inefficiency persistence and heterogeneity in the Colombian distribution sector. In this paper, we propose an extension of dynamic stochastic frontier models that accounts for unobserved heterogeneity in the inefficiency persistence and in the technology. The model incorporates total expenses, service quality and energy losses in an efficiency analysis of Colombian distributors over fifteen years after the reform. We identify the presence of high inefficiency persistence in the sector, and important differences between firms. In particular, rural companies and firms with small customers present low persistence and evidence the largest gains in efficiency during the period. However, increases in efficiency are only manifested during thelast five years when the main improvements in service quality and energy losses are presented. Overall, inefficiency persistence, customer density and consumption density are found to be important criteria to be considered for regulatory purposes. - Highlights: • We evaluate efficiency of Colombian electricity distributors after the reform. • We use a stochastic frontier model with dynamic effects and heterogeneity. • We find high inefficiency persistence but important differences among firms. • High persistent and low efficient firms should draw the attention of the regulator. • Recent regulation in quality has increased not only efficiency but also tariffs

  6. Study Of Solar Charging Facility For Electric Vehicles In Edinburgh

    Directory of Open Access Journals (Sweden)

    Walid Nassar

    2015-08-01

    Full Text Available The solar power system decreases carbon dioxide CO2 emissions which are the lead cause of global warming. This paper presented a novel way to design a commercial solar photovoltaic PV farm to provide electricity for 10 of the Edinburgh domestic car fleet. The design is used for sizing of the solar system based on an excel spreadsheets. The results show that the proposed solar system reduces the CO2 emissions with around 95 less than the conventional energy system. Around 0.5TWh of electrical energy is required to meet Edinburgh domestic car fleet whenever converted to electrical vehicles. The PV solar panels at the investigated site has a capacity factor of around 12. The dynamic tilt angle is estimated for the investigated site while the fixed tilt angle is determined to be 49. Depending on dynamic solar panels leads to harvesting more solar energy than depending on fixed tilt angle around 14 higher energy. The meter square of land in Edinburgh receive some 950KWh per year based on the dynamic tilt angle. Around 218000 of solar panels are required to meet 10 of Edinburgh domestic car fleet.

  7. Conceptual designs of near surface disposal facility for radioactive waste arising from the facilities using radioisotopes and research facilities for nuclear energy development and utilization

    International Nuclear Information System (INIS)

    Sakai, Akihiro; Yoshimori, Michiro; Okoshi, Minoru; Yamamoto, Tadatoshi; Abe, Masayoshi

    2001-03-01

    Various kinds of radioactive waste is generating from the utilization of radioisotopes in the field of science, technology, etc. and the utilization and development of nuclear energy. In order to promote the utilization of radionuclides and the research activities, it is necessary to treat and dispose of radioactive waste safely and economically. Japan Nuclear Cycle Development Institute (JNC), Japan Radioisotope Association (JRIA) and Japan Atomic Energy Research Institute (JAERI), which are the major waste generators in Japan in these fields, are promoting the technical investigations for treatment and disposal of the radioactive waste co-operately. Conceptual design of disposal facility is necessary to demonstrate the feasibility of waste disposal business and to determine the some conditions such as the area size of the disposal facility. Three institutes share the works to design disposal facility. Based on our research activities and experiences of waste disposal, JAERI implemented the designing of near surface disposal facilities, namely, simple earthen trench and concrete vaults. The designing was performed based on the following three assumed site conditions to cover the future site conditions: (1) Case 1 - Inland area with low groundwater level, (2) Case 2 - Inland area with high groundwater level, (3) Case 3 - Coastal area. The estimation of construction costs and the safety analysis were also performed based on the designing of facilities. The safety assessment results show that the safety for concrete vault type repository is ensured by adding low permeability soil layer, i.e. mixture of soil and bentonite, surrounding the vaults not depending on the site conditions. The safety assessment results for simple earthen trench also show that their safety is ensured not depending on the site conditions, if they are constructed above groundwater levels. The construction costs largely depend on the depth for excavation to build the repositories. (author)

  8. Another year of change for Canadian electric utilities as they continue to meet new challenges

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    The activities of Canadian electric utilities in the past year were highlighted. The companies reviewed were: B.C. Hydro, Edmonton Power, TransAlta Utilities Corporation, Manitoba Hydro, Ontario Hydro, Hydro-Quebec, New Brunswick Power Corporation, Nova Scotia Power Inc., and Newfoundland Power. Reviews of the industry, economic growth, market trends and forecasts were discussed

  9. NOX EMISSION CONTROL OPTIONS FOR COAL-FIRED ELECTRIC UTILITY BOILERS

    Science.gov (United States)

    The paper reviews NOx control options for coal-fired electric utility boilers. (NOTE: Acid Rain NOx regulations, the Ozone Transport Commission's NOx Budget Program, revision of the New Source Performance Standards (NSPS) for NOx emissions from utility sources, and Ozone Transpor...

  10. Electric system reliability considerations in a changing utility environment

    International Nuclear Information System (INIS)

    Kramer, R.A.

    1991-01-01

    The utility industry is presently experiencing a number of diverse factors which may alter the way that it operates and in many cases the way in which it is configured. These factors reflect a variety of circumstances including increased competitive pressures and political perception. While many of these changes may result in long term economic and service benefits to the industry and customer alike, it is important to recognize the desirability of orderly change. There is need to implement change in a reasoned manner. In this paper technical as well as economic and political considerations are addressed

  11. Utilization of low temperature heat for environmentally friendly electricity production

    DEFF Research Database (Denmark)

    Andreasen, Jesper Graa; Elmegaard, Brian; Haglind, Fredrik

    2014-01-01

    the benefits of using mixtures compared to pure fluids as working fluids in organic Rankine cycles. In order to do so, thermodynamic and economic analyses are carried out, first on an overall cycle level, and next on component level including detailed modelling of heat exchangers, pumps and expanders involving...... project collaborators with expertise in these areas. In addition to this, novel innovative cycle layouts are developed with the aim of increasing the economic feasibility of utilizing low temperature heat. As an example, this can be achieved by implementing separators in the power cycle to create optimal...

  12. Modified electrical survey for effective leakage detection at concrete hydraulic facilities

    Science.gov (United States)

    Lee, Bomi; Oh, Seokhoon

    2018-02-01

    Three original electrode arrays for the effective leakage detection of concrete hydraulic facilities through electrical resistivity surveys are proposed: 'cross-potential', 'direct-potential' and modified tomography-like arrays. The main differences with respect to the commonly used arrays are that the current line-sources are separated from potential pole lines and floated upon the water. The potential pole lines are located directly next to the facility in order to obtain intuitive data and useful interpretations of the internal conditions of the hydraulic facility. This modified configuration of the array clearly displays the horizontal variation of the electrical field around the damaged zones of the concrete hydraulic facility, and any anomalous regions that might be found between potential poles placed across the facilities. In order to facilitate the interpretation of these modified electrical surveys, a new and creative way of presenting the measurements is also proposed and an inversion approach is provided for the modified tomography-like array. A numerical modeling and two field tests were performed to verify these new arrays and interpretation methods. The cross and direct potential array implied an ability to detect small variations of the potential field near the measurement poles. The proposed array showed the overall potential distribution across the hydraulic facility which may be used to assist in the search of trouble zones within the structure, in combination with the traditional electrical resistivity array.

  13. Data warehousing for electric utilities; Data Warehousing fuer Stromerzeuger im Strommarkt

    Energy Technology Data Exchange (ETDEWEB)

    Rappenecker, G.; Wolff, G.; Gross, P.

    2000-07-01

    Deregulation of the electricity market has changed the business processes of electric utilities profoundly. The paradigm of availability was replaced by economic efficiency. Four requirements are decisive: Implementation of unbundling as required by law - cost reduction to enhance competitive strength - marketing of the utilities' own products - positioning in the new electricity market. [German] Die Deregulierung des Strommarktes hat die Geschaeftsprozesse der Stromerzeuger grundlegend gewandelt. Das Paradigma der Versorgungssicherheit wurde ersetzt durch das der Wirtschaftlichkeit. Die Veraenderung der Geschaeftsprozesse der Stromerzeuger sind massiv gepraegt von vier Anforderungen: - Umsetzung des gesetzlich vorgeschriebenen 'Unbundling' - Erhalt der Konkurrenzfaehigkeit durch Kostensenkung - Vermarktung der eigenen Produkte - Positionierung im neu entstehenden Strommarkt. (orig.)

  14. Gross domestic product estimation based on electricity utilization by artificial neural network

    Science.gov (United States)

    Stevanović, Mirjana; Vujičić, Slađana; Gajić, Aleksandar M.

    2018-01-01

    The main goal of the paper was to estimate gross domestic product (GDP) based on electricity estimation by artificial neural network (ANN). The electricity utilization was analyzed based on different sources like renewable, coal and nuclear sources. The ANN network was trained with two training algorithms namely extreme learning method and back-propagation algorithm in order to produce the best prediction results of the GDP. According to the results it can be concluded that the ANN model with extreme learning method could produce the acceptable prediction of the GDP based on the electricity utilization.

  15. Additional Energy Losses from Asymmetric and Non-Sinusoidal Current in an Electrical Facility and Methods of their Reduction

    OpenAIRE

    Tarasov, Evgeny Vladimirovich; Bulyga, Leonid Leonidovich; Ushakov, Vasily Yakovlevich; Kharlov, Nikolay Nikolaevich

    2015-01-01

    Influence of the asymmetry and higher harmonics of current on the operation of an electrical facility is analyzed. The level of additional losses from the asymmetric and non-sinusoidal currents is evaluated for a 110 kV electrical network in the Siberian Region of the Russian Federation. Methods for reducing the additional energy losses in the electrical facility are suggested.

  16. A ''New Generation'' of Nuclear Power Plants- Electric Utility Aspects

    International Nuclear Information System (INIS)

    Marouani, D.; Reznik, L.; Tavron, B.

    1999-01-01

    A 50% increase in worldwide energy consumption in the next 20 years is anticipated, due to the global population growth and to higher standards of living. Meeting these energy demands with the fossil energy sources such as coal. gas and oil may lead to atmospheric accumulation of greenhouse gases, resulting in global warming of several degrees with catastrophic climatic consequences. Implementation of various energy conservation measures may bring only insignificant reduction in demand levels. Hopes that the renewable energy sources (such as hydroelectric, solar, wind power, biomass and geothermal) may supply the growth in the demand - are unrealistic. Only nuclear power (providing already 16% of world electricity) may meet all the energy demand growth with negligible greenhouse emission

  17. Computer model for estimating electric utility environmental noise

    International Nuclear Information System (INIS)

    Teplitzky, A.M.; Hahn, K.J.

    1991-01-01

    This paper reports on a computer code for estimating environmental noise emissions from the operation and the construction of electric power plants that was developed based on algorithms. The computer code (Model) is used to predict octave band sound power levels for power plant operation and construction activities on the basis of the equipment operating characteristics and calculates off-site sound levels for each noise source and for an entire plant. Estimated noise levels are presented either as A-weighted sound level contours around the power plant or as octave band levels at user defined receptor locations. Calculated sound levels can be compared with user designated noise criteria, and the program can assist the user in analyzing alternative noise control strategies

  18. A decision support model for reducing electric energy consumption in elementary school facilities

    International Nuclear Information System (INIS)

    Hong, Taehoon; Koo, Choongwan; Jeong, Kwangbok

    2012-01-01

    Highlights: ► Decision support model is developed to reduce CO 2 emission in elementary schools. ► The model can select the school to be the most effective in energy savings. ► Decision tree improved the prediction accuracy by 1.83–3.88%. ► Using the model, decision-maker can save the electric-energy consumption by 16.58%. ► The model can make the educational-facility improvement program more effective. -- Abstract: The South Korean government has been actively promoting an educational-facility improvement program as part of its energy-saving efforts. This research seeks to develop a decision support model for selecting the facility expected to be effective in generating energy savings and making the facility improvement program more effective. In this research, project characteristics and electric-energy consumption data for the year 2009 were collected from 6282 elementary schools located in seven metropolitan cities in South Korea. In this research, the following were carried out: (i) a group of educational facilities was established based on electric-energy consumption, using a decision tree; (ii) a number of similar projects were retrieved from the same group of facilities, using case-based reasoning; and (iii) the accuracy of prediction was improved, using the combination of genetic algorithms, the artificial neural network, and multiple regression analysis. The results of this research can be useful for the following purposes: (i) preliminary research on the systematic and continuous management of educational facilities’ electric-energy consumption; (ii) basic research on electric-energy consumption prediction based on the project characteristics; and (iii) practical research for selecting an optimum facility that can more effectively apply an educational-facility improvement program as a decision support model.

  19. Dealing with the paradox of energy efficiency promotion by electric utilities

    International Nuclear Information System (INIS)

    Sousa, José Luís; Martins, António Gomes; Jorge, Humberto

    2013-01-01

    Utility-based Demand-Side Management (DSM) programmes started after the oil crises of the 70's and were adopted by utilities as a standard practice. However, deregulation of the electricity industry threatened DSM. More recent concerns regarding energy dependence and environmental impact of energy use caused renewed attention on the utilities role in energy efficiency fostering. EE is presently a cross-cutting issue, influencing energy policy definition and regulatory activity worldwide. Some instruments for influencing the behaviour of electric utilities in the market are used by regulators, corresponding to both impositions and stimuli, such as defining savings targets or decoupling profits from energy sales. The paper addresses categories of regulatory instruments and refers to examples of countries and regions using these identified categories of instruments. Although some cases show voluntary involvement of utilities in EE promotion on the grounds of customer retention strategies, there is a clear prevalence of regulatory constrained markets where utilities rationally engage in energy efficiency promotion

  20. Electric-utility returns and risk in the light of Three Mile Island

    International Nuclear Information System (INIS)

    Brooks, L.D.; D'Souza, R.E.

    1982-01-01

    The impact of the Three Mile Island nuclear-generating-unit failure on the performance of nuclear-dependent electric utilities is examined in this article. A comparative examination of the time series of abnormal returns and risk measures on nuclear-dependent utilities and nondependent utilities prior to the TMI incident, at the time of the incident, and subsequent to it was performed by the authors. The results are consistent with a hypothesis that investors associate a decline in future profitability or increased risk with nuclear-associated utilities. However, the more-objective measures indicate a clear reduction in risk for nuclear-associated utilities since the TMI incident, both in relation to the market as a whole and in relation to electric utilities which are not nuclear-associated. 4 references, 1 figure, 3 tables

  1. Review of inter-utility trade in electricity: Analyses of submissions

    International Nuclear Information System (INIS)

    1994-04-01

    In November 1992, Canada's National Energy Board released two discussion papers describing its review of inter-utility trade in electricity. The review was undertaken to report on measures that could be taken to enhance interprovincial trade in electricity by encouraging greater cooperation among utilities in systems planning and development, and by enabling buyers and sellers of electricity to obtain commercial access to available transmission capacity through intermediate provinces for wheeling purposes. Interested parties were invited to comment on the papers and 42 responses were received from Canadian utilities, provincial governments, regulatory agencies, and others. These responses are summarized and analyzed, providing an indication of how future policy initiatives on electricity trade might be received. Most submitters agreed that there is a need to enable commercial access to available transmission capacity through intermediate provinces for wheeling purposes. Of the seven options described in the discussion papers that would enable buyers and sellers of electricity to gain commercial access to transmission grids, the status quo was preferred by those utilities and provinces that have direct access to export markets by virtue of their geographic location. Those utilities and provinces that do not have such direct access tend to support, as a last resort, mandated solutions to disputes concerning electricity trade. 78 figs

  2. Willingness to Pay for Renewable Electricity: A Review of Utility Market Research

    Energy Technology Data Exchange (ETDEWEB)

    Farhar, B. C.

    1999-09-09

    As competition in the electric utility industry has become more widespread and federal legislation deregulating the utility industry more likely, utilities have become more concerned about actions they can take to help ensure the loyalty of their customers. National polls have, for 20 years, found majority preferences for renewable energy over other energy sources. This issue brief compiles and analyzes recent market research conducted by utility companies on customer interest in and willingness to pay for renewable electricity. Findings in the areas examined in this review are: Customers are favorable toward renewable sources of electricity, although they know little about them; Solar and wind are the most favored sources of electricity generation; Majorities of 52% to nearly 100% of residential customers said they were willing to pay at least a modest amount more per month on their electric bills for green power; their responses follow a predictable curve showing that percentages willing to pay more decline as cost increases. The residential market for green pricing is approximately 2% near program rollout at a $5/month price increment, and should increase slowly but steadily over time; Customers may view with favor, and be more willing to purchase electricity from, utilities that provide green power.

  3. Blending of electricity pricing with time flavour - an analysis of net system benefit to an electric utility in India

    International Nuclear Information System (INIS)

    Bhardwaj, J.L.

    1992-01-01

    Demand-side Management is a powerful strategy for modifying electric energy consumption patterns for the mutual benefit of consumers, the supplier and the economy as a whole Time-of-use pricing of electricity suggest a policy where the price is time-differentiated so as to reduce contribution to the system-peak which determines the capacity and investments of a power-system. This paper describes a case-study of net system benefit to an electric utility in India by offering time-of-use tariff to high voltage (HV) industrial consumers. The study shows that there is a potential of shifting about 19% H.V. Industrial loads from peak to off-peak hours thereby benefitting both, the consumers and the utility. 1 fig., 2 tabs

  4. Financial statistics of major U.S. publicly owned electric utilities 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The 1995 Edition of the Financial Statistics of Major U.S. Publicly Owned Electric Utilities publication presents 5 years (1991 through 1995) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decisionmaking purposes related to publicly owned electric utility issues. Generator (Tables 3 through 11) and nongenerator (Tables 12 through 20) summaries are presented in this publication. Five years of summary financial data are provided (Tables 5 through 11 and 14 through 20). Summaries of generators for fiscal years ending June 30 and December 31, nongenerators for fiscal years ending June 30 and December 31, and summaries of all respondents are provided in Appendix C. The composite tables present aggregates of income statement and balance sheet data, as well as financial indicators. Composite tables also display electric operation and maintenance expenses, electric utility plant, number of consumers, sales of electricity, and operating revenue, and electric energy account data. 9 figs., 87 tabs.

  5. Financial statistics of major U.S. publicly owned electric utilities 1995

    International Nuclear Information System (INIS)

    1997-07-01

    The 1995 Edition of the Financial Statistics of Major U.S. Publicly Owned Electric Utilities publication presents 5 years (1991 through 1995) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decisionmaking purposes related to publicly owned electric utility issues. Generator (Tables 3 through 11) and nongenerator (Tables 12 through 20) summaries are presented in this publication. Five years of summary financial data are provided (Tables 5 through 11 and 14 through 20). Summaries of generators for fiscal years ending June 30 and December 31, nongenerators for fiscal years ending June 30 and December 31, and summaries of all respondents are provided in Appendix C. The composite tables present aggregates of income statement and balance sheet data, as well as financial indicators. Composite tables also display electric operation and maintenance expenses, electric utility plant, number of consumers, sales of electricity, and operating revenue, and electric energy account data. 9 figs., 87 tabs

  6. Do acquisitions by electric utility companies create value? Evidence from deregulated markets

    International Nuclear Information System (INIS)

    Kishimoto, Jo; Goto, Mika; Inoue, Kotaro

    2017-01-01

    In the early 1990s, the United Kingdom (the UK) initiated widespread reforms in the electricity industry through a series of market liberalization policies. Several other countries have subsequently followed the lead and restructured their electricity industry. A major outcome of the deregulation effort is the spate of takeovers, both domestic and global, by electric utility companies. With the entry of new players and increasing competition, the business environment of the electricity industry has changed dramatically. This study analyzes the economic impact of mergers and acquisitions (M&As) in the electric utility industry after deregulation. We have examined acquisitions that took place between 1998 and 2013 in the United States, Canada, the UK, Germany, and France. Although previous studies showed no evidence of a positive effect on acquiring firms through M&As, we find that acquisitions by electric utility companies increased the acquiring firms’ share value and improved their operating performance, primarily through efficiency gains after the deregulation. These results are consistent with the empirical evidence and implications presented by Andrade et al. (2001) that M&A created value for the shareholders of the acquiring and target combined firms. - Highlights: • This study examined mergers and acquisitions (M&A) in electric utility industry. • The sample covered M&A between 1998 and 2013 in North America and Europe. • We found M&A significantly increased acquiring firms’ share value and operating performance. • Deregulation policy realized gains for shareholders without incurring costs for consumers.

  7. Environmental assessment for the electric utility system distribution, replacements and upgrades at Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    1992-04-01

    This Environmental Assessment evaluates the environmental effects resulting from the distribution of new electrical service, replacement of inadequate or aging equipment, and upgrade of the existing electrical utility system at Lawrence Livermore National Laboratory. The projects assessed herein do not impact cultural or historic resources, sensitive habitats or wetlands and are not a source of air emissions. The potential environmental effects that do result from the action are fugitive dust and noise from construction and the disposal of potentially contaminated soil removed from certain limited areas of the LLNL site as a result of trenching for underground transmission lines. The actions described in this assessment represent an improved safety and reliability to the existing utility system. Inherent in the increased reliability and upgrades is a net increase in electrical capacity, with future expansion reserve. As with any electrical device, the electrical utility system has associated electric and magnetic fields that present a potential source of personnel exposure. The potential is not increased, however, beyond that which already exists for the present electrical utility system

  8. Safety Research Experiment Facility Project. Conceptual design report. Volume III. Utilities

    International Nuclear Information System (INIS)

    1975-12-01

    The SAREF Electric Power System supplies and distributes power from the EBR-II switchgear for operation of all normal facilities on the site, from an on-site Experiment Diesel Generator for operation of all experiment related loads, and from an emergency engine generator and/or an uninterruptible power supply for operation of all essential and critical loads during a failure of both of the other two systems

  9. Practical human abdominal fat imaging utilizing electrical impedance tomography.

    Science.gov (United States)

    Yamaguchi, T; Maki, K; Katashima, M

    2010-07-01

    The fundamental cause of metabolic syndrome is thought to be abdominal obesity. Accurate diagnosis of abdominal obesity can be done by an x-ray computed tomography (CT) scan. But CT is expensive, bulky and entails the risks involved with radiation. To overcome such disadvantages, we attempted to develop a measuring device that could apply electrical impedance tomography to abdominal fat imaging. The device has 32 electrodes that can be attached to a subject's abdomen by a pneumatic mechanism. That way, electrode position data can be acquired simultaneously. An applied alternating current of 1.0 mArms was used at a frequency of 500 kHz. Sensed voltage data were carefully filtered to remove noise and processed to satisfy the reciprocal theorem. The image reconstruction software was developed concurrently, applying standard finite element methods and the Marquardt method to solve the mathematical inverse problem. The results of preliminary experiments showed that abdominal subcutaneous fat and the muscle surrounding the viscera could be imaged in humans. While our imaging of visceral fat was not of sufficient quality, it was suggested that we will be able to develop a safe and practical abdominal fat scanner through future improvements.

  10. Practical human abdominal fat imaging utilizing electrical impedance tomography

    International Nuclear Information System (INIS)

    Yamaguchi, T; Katashima, M; Maki, K

    2010-01-01

    The fundamental cause of metabolic syndrome is thought to be abdominal obesity. Accurate diagnosis of abdominal obesity can be done by an x-ray computed tomography (CT) scan. But CT is expensive, bulky and entails the risks involved with radiation. To overcome such disadvantages, we attempted to develop a measuring device that could apply electrical impedance tomography to abdominal fat imaging. The device has 32 electrodes that can be attached to a subject's abdomen by a pneumatic mechanism. That way, electrode position data can be acquired simultaneously. An applied alternating current of 1.0 mArms was used at a frequency of 500 kHz. Sensed voltage data were carefully filtered to remove noise and processed to satisfy the reciprocal theorem. The image reconstruction software was developed concurrently, applying standard finite element methods and the Marquardt method to solve the mathematical inverse problem. The results of preliminary experiments showed that abdominal subcutaneous fat and the muscle surrounding the viscera could be imaged in humans. While our imaging of visceral fat was not of sufficient quality, it was suggested that we will be able to develop a safe and practical abdominal fat scanner through future improvements

  11. FACTS controllers and the deregulated electric utility environment

    International Nuclear Information System (INIS)

    Ooi, B. T.; Galiana, F. D.; McGillis, D.; Joos, G.; Marceau, R.

    1998-01-01

    The concept of Flexible AC Transmission Systems (FACTS) is explored and the potential of power electronic converters to increase flexibility and reliability of modern power systems is explored. Power electronic controllers can reduce the required safety margin in electric power generation capacity through the use of faster controllers based on exploiting the high-power solid-state switches with gate-turn-off capabilities. The FACTS concept makes it possible to postpone the financial investment needed to build more power lines, and also offers a solution to securing the right-of-way to build new lines. Currently available FACTS controllers such as the Static var Compensator (STATCOM) and the Unified Power Flow Controller (UPFC) are described, including their function, structure and relevant implementation issues. Since they can produce the required amount of reactive power independently of line voltage or current, and if equipped with energy storing devices they can supply real power as required, they are a necessary element for the control of power systems in a deregulated environment. 15 refs., 3 figs

  12. Estimating potential stranded commitments for U.S. investor-owned electric utilities

    International Nuclear Information System (INIS)

    Baxter, L.; Hirst, E.

    1995-01-01

    New technologies, low natural gas prices, and federal and state utility regions are restructuring the electricity industry. Yesterday's vertically integrated utility with a retail monopoly franchise may be a very different organization in a few years. Conferences, regulatory-commission hearings, and other industry fora are dominated by debates over the extent and form of utility deintegration, wholesale competition, and retail wheeling. A key obstacle to restructuring the electricity industry is stranded commitments. Past investments, power-purchase contracts, and public-policy-driven programs that made sense in an era of cost-of-service regulation may not be cost-effective in a competitive power market. Regulators, utilities, and other parties face tough decisions concerning the mitigation and allocation of these stranded commitments. The authors developed and applied a simple method to calculate the amount of stranded commitments facing US investor-owned electric utilities. The results obtained with this method depend strongly on a few key assumptions: (1) the fraction of utility sales that is at risk with respect to competition, (2) the market price of electric generation, and (3) the number of years during which the utility would lose money because of differences between its embedded cost of production and the market price

  13. Electric utility load management: rational use of energy program pilot study

    Energy Technology Data Exchange (ETDEWEB)

    1977-08-01

    In recognition of the role that load management can play in ensuring that the growing demand for electricity is met in a cost- and energy-efficient manner, in mid-1974, the NATO Committee on the Challenges of Modern Society sponsored all three meetings to provide a forum for representatives of U.S. and European utilities to exchange views and experiences on the various aspects of load management. It was the consensus of representatives at the meetings that three overall approaches offer significant opportunities for achieving improved load management: development of marginal-cost rate structures; power pooling and energy storage by utilities; and efforts by consumers. Industrial consumers can assist electric utilities in their efforts to level system loads through three important methods: interruptible power and deferred load control; peak self-generation; and shifts in operating schedules. Residential/commercial consumers also have an important role to play by managing both their electric heating load (through the interruption of direct-resistance heating and the storage of heat) and their air conditioning load. In response to the interest expressed by the participants in the CCMS conferences, the U.S. and several European governments, national electric utility industry organizations, state public utility commissions, and many individual utilities have undertaken R and D projects to investigate and test various aspects of these three approaches to load management. This report describes the projects that were presented by the utility representatives.

  14. The utilization characteristics of social facilities in the border area of Semarang city

    Science.gov (United States)

    Setioko, Bambang; Olivia, Deasy; Pandelaki, Edward E.; Murtini, Titien Woro

    2017-06-01

    The rapid growth of settlement in border areas is often considered as a problem of big cities in Indonesia, where people from rural areas prefer to move out and settle in the border areas of big cities due to the provision of better social facilities. Border areas generally do not receive adequate attention and are often overlooked by the local government. It is a common phenomenon in Indonesian cities, including in Semarang City. Increased number of settlements in the border areas in Semarang City is in linear with spontaneous urbanization processes which indicate the heterogeneity emerging of settlement areas. In the early stages of Semarang City spatial planning, the need for social facilities in border areas is included based on the regular standard which is commonly applied to the urban core. In a very short period, the numbers and types of existing social facilities are insufficient to fulfill the needs of the community. Nowadays, in the context of rapid urbanization, the growth of social facilities in border areas is very high. The intense growth of settlements in border areas is very high due to the low price of land in Demak Regency in compared to those of other areas in Semarang City. However, only a few developers involved social facilities as a part of housing estate construction. Consequently, most of the occupants utilize a limited number of social facilities provided by the municipal government, which are actually intended to serve the citizens of Semarang City. This research was conducted at Sendang Mulyo Village which is located in the border of Semarang municipal administrative area and included in Demak Regency. This paper discusses the utilization characteristics of social facilities in the border area of Semarang City, with the aim to get the trigger factors. The method analysis consisted of a statistical test and descriptive analysis. The utilization characteristics were formulated based on the relationship between neighborhood and human

  15. Strategic sizing of energy storage facilities in electricity markets

    DEFF Research Database (Denmark)

    Nasrolahpour, Ehsan; Kazempour, Seyyedjalal; Zareipour, Hamidreza

    2016-01-01

    This paper proposes a model to determine the optimasize of an energy storage facility from a strategic investor’s perspective. This investor seeks to maximize its profit through making strategic planning, i.e., storage sizing, and strategic operational, i.e., offering and bidding, decisions. We...... consider the uncertainties associated with rival generators’ offering strategies and future load levels in the proposed model. The strategic investment decisions include the sizes of charging device, discharging device and energy reservoir. The proposed model is a stochastic bi-level optimization problem......; the planning and operation decisions are made in the upper-level, and market clearing is modeled in the lower-level under different operating scenarios. To make the proposed model computationally tractable, an iterative solution technique based on Benders’ decomposition is implemented. This provides a master...

  16. The case for indexed price caps for U.S. electric utilities

    International Nuclear Information System (INIS)

    Lowry, M.N.

    1991-01-01

    Indexed price caps are a promising alternative to traditional, cost-of-service utility rate regulation. In just a decade, they have sprung from the drawing boards of economists to use by major utilities in a number of industries. Several authors have discussed the merits of indexed price caps for U.S. electric utilities. Despite their efforts, many parties to electric utility policy making are unfamiliar with the subject. This is unsurprising given the policy controversies that already embroil the industry. It is also unfortunate, since indexed price caps may help solve some of the problems that prompt these controversies. Indexed price caps can improve electric utility rate regulation in two ways. Utilities would have strong incentives to improve performance without the micromanagement that increasingly characterizes state-level regulation. Utilities could also be granted more extensive marketing freedoms, since indexes can protect customers from cross-subsidization. Two areas of concern about indexed price cap plans have emerged in recent discussions that the author has held with officials of electric utilities, intervenor groups, and regulatory agencies. Officials are often unclear on plan details, and therefore may not appreciate the degree of flexibility that is possible in plan design. Confusion over the available options in price cap adjustment indexes and the logic behind them is especially widespread. Officials also desire a clearer expression of how indexed price caps can coexist with current regulatory initiatives. This article details the major attributes of index plans, provides a brief history of indexing, discusses index design options in depth, and concludes with a vision of how indexed price caps can be made operational in today's electric utility industry

  17. Coping with nuclear power risks: the electric utility incentives

    International Nuclear Information System (INIS)

    Starr, C.; Whipple, C.

    1982-01-01

    The financial risks associated with nuclear power accidents are estimated by interpolating between frequency-vs.-severity data from routine outages and the frequency-vs.-severity estimates from the Nuclear Regulatory Commission's (NRC's) Reactor Safety Study (WASH-1400). This analysis indicates that the expected costs of plant damage and lost power production are large compared to the public risks estimated in WASH-1400, using values from An Approach to Quantitative Safety Goals for Nuclear Power Plants (NUREG-0739), prepared by the NRC Advisory Committee on Reactor Safeguards. Analyses of the cost-effectiveness of accident-prevention investments that include only anticipated public safety benefits will underestimate the value of such investments if reductions in power plant damage risk are not included. The analysis also suggests that utility self-interest and the public interest in safety are generally coincident. It is argued that greater use could be made of this self-interest in regulation if the relationship between the NRC and the industry were more cooperative, less adversary in nature

  18. Native American Technical Assistance and Training for Renewable Energy Resource Development and Electrical Generation Facilities Management

    Energy Technology Data Exchange (ETDEWEB)

    A. David Lester

    2008-10-17

    The Council of Energy Resource Tribes (CERT) will facilitate technical expertise and training of Native Americans in renewable energy resource development for electrical generation facilities, and distributed generation options contributing to feasibility studies, strategic planning and visioning. CERT will also provide information to Tribes on energy efficiency and energy management techniques.This project will provide facilitation and coordination of expertise from government agencies and private industries to interact with Native Americans in ways that will result in renewable energy resource development, energy efficiency program development, and electrical generation facilities management by Tribal entities. The intent of this cooperative agreement is to help build capacity within the Tribes to manage these important resources.

  19. Utilization of the capsule out-pile test facilities(2000-2003)

    Energy Technology Data Exchange (ETDEWEB)

    Cho, M. S.; Oh, J. M.; Cho, Y. G. and others

    2003-06-01

    Two out-pile test facilities were installed and being utilized for the non-irradiation tests outside the HANARO. The names of the facilities are the irradiation equipment design verification test facilities and the one-channel flow test device. In these facilities, the performance test of all capsules manufactured before loading in the HANARO and the design verification test for newly developed capsules were performed. The tests in these facilities include loading/unloading, pressure drop, endurance and vibration test etc. of capsules. In the period 2000{approx}2003, the performance tests for 8 material capsules of 99M-01K{approx}02M-05U were carried out, and the design verification tests of creep and fuel capsules developed newly were performed. For development of the creep capsule, pressure drop measurement, operation test of heater, T/C, LVDT and stress loading test were performed. In the design stage of the fuel capsule, the endurance and vibration test besides the above mentioned tests were carried out for verification of the safe operation during irradiation test in the HANARO. And in-chimeny bracket and the capsule supporting system were fixed and the flow tubes and the handling tools were manufactured for use at the facilities.

  20. 10 CFR 170.21 - Schedule of fees for production and utilization facilities, review of standard referenced design...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Schedule of fees for production and utilization facilities, review of standard referenced design approvals, special projects, inspections and import and export... AMENDED Schedule of Fees § 170.21 Schedule of fees for production and utilization facilities, review of...

  1. Regulatory environment and its impact on the market value of investor-owned electric utilities

    Science.gov (United States)

    Vishwanathan, Raman

    While other regulated industries have one by one been exposed to competitive reform, electric power, for over eighty years, has remained a great monopoly. For all those years, the vertically integrated suppliers of electricity in the United States have been assigned exclusive territorial (consumer) franchises and have been closely regulated. This environment is in the process change because the electric power industry is currently undergoing some dramatic adjustments. Since 1992, a number of states have initiated regulatory reform and are moving to allow retail customers to choose their energy supplier. There has also been a considerable federal government role in encouraging competition in the generation and transmission of electricity. The objective of this research is to investigate the reaction of investors to the prevailing regulatory environment in the electric utility industry by analyzing the market-to-book value for investor-owned electric utilities in the United States as a gauge of investor concern or support for change. In this study, the variable of interest is the market valuation of utilities, as it captures investor confidence to changes in the regulatory environment. Initially a classic regression model is analyzed on the full sample (of the 96 investor-owned utilities for the years 1992 through 1996), providing a total number of 480 (96 firms over 5 years) observations. Later fixed- and random-effects models are analyzed for the same full-sample model specified in the previous analysis. Also, the analysis is carried forward to examine the impact of the size of the utility and its degree of reliability on nuclear power generation on market values. In the period of this study, 1992--1996, the financial security markets downgraded utilities that were still operating in a regulated environment or had a substantial percentage of their power generation from nuclear power plants. It was also found that the financial market was sensitive to the size of

  2. Locations and attributes of utility-scale solar power facilities in Colorado and New Mexico, 2011

    Science.gov (United States)

    Ignizio, Drew A.; Carr, Natasha B.

    2012-01-01

    The data series consists of polygonal boundaries for utility-scale solar power facilities (both photovoltaic and concentrating solar power) located within Colorado and New Mexico as of December 2011. Attributes captured for each facility include the following: facility name, size/production capacity (in MW), type of solar technology employed, location, state, operational status, year the facility came online, and source identification information. Facility locations and perimeters were derived from 1-meter true-color aerial photographs (2011) produced by the National Agriculture Imagery Program (NAIP); the photographs have a positional accuracy of about ±5 meters (accessed from the NAIP GIS service: http://gis.apfo.usda.gov/arcgis/services). Solar facility perimeters represent the full extent of each solar facility site, unless otherwise noted. When visible, linear features such as fences or road lines were used to delineate the full extent of the solar facility. All related equipment including buildings, power substations, and other associated infrastructure were included within the solar facility. If solar infrastructure was indistinguishable from adjacent infrastructure, or if solar panels were installed on existing building tops, only the solar collecting equipment was digitized. The "Polygon" field indicates whether the "equipment footprint" or the full "site outline" was digitized. The spatial accuracy of features that represent site perimeters or an equipment footprint is estimated at +/- 10 meters. Facilities under construction or not fully visible in the NAIP imagery at the time of digitization (December 2011) are represented by an approximate site outline based on the best available information and documenting materials. The spatial accuracy of these facilities cannot be estimated without more up-to-date imagery – users are advised to consult more recent imagery as it becomes available. The "Status" field provides information about the operational

  3. Utilization and expenditure at public and private facilities in 39 low-income countries.

    Science.gov (United States)

    Saksena, Priyanka; Xu, Ke; Elovainio, Riku; Perrot, Jean

    2012-01-01

    To document the patterns of health service utilization and health payments at public and private facilities across countries. We used data from the World Health Surveys from 39 low- and low-middle income countries to examine differences between public and private sectors. Utilization of outpatient and inpatient services, out-of-pocket payments (OOP) at public and private facilities, and transportation costs were compared. Utilization and payments to public and private sectors differ widely. Public facilities dominated in most countries for both outpatient and inpatient services. But, whereas use of private facilities is more common among the rich, poor people also use them, to a considerable extent and in almost all the countries in the study. The majority of OOP were incurred at public providers for inpatient services. On average, this was not the case for outpatient services. Medicines accounted for the largest share of OOP for all services except inpatient services at private facilities, where consultation fees did. Transportation costs were considerable. Price competition is certainly not the only factor that guides choice of provider. The results support continued efforts by the governments to engage strategically with the private sector. However, they also highlight the importance of not generalizing conditions across countries. Governments may need to reconsider simplistic user-fee abolition strategies at public providers if they simply focus on consultation fees. Policies to make health services more accessible need to consider a comprehensive benefit package that includes a wider scope of costs related to care such as expenditures on medicines and transportation. © 2011 Blackwell Publishing Ltd.

  4. Optimal number of energy generators for biogas utilization in wastewater treatment facility

    International Nuclear Information System (INIS)

    Tsagarakis, Konstantinos P.

    2007-01-01

    A technoeconomic analysis has been undertaken considering the optimum number of energy producing generators using biogas coming from anaerobic digestion. Inputs for this analysis originate from available data on the first generator for energy production from biogas, installed in Greece at the wastewater treatment facility of Iraklio city. The data spans a period of 5.5 years of operation. It is concluded that the cost per kWh produced is 0.0876 Euro /kWh if one generator is used covering 15.9% of the facility's needs. If two generators are used, more biogas is utilized contributing 32.6% of the facility's needs at a marginal production cost of 0.0886 Euro /kWh. Similar estimations have been made for scenarios involving up to six generators. In contrast, the marginal cost of conventionally produced energy is 0.1383-0.2483 Euro /kWh

  5. Progress and problems in the Formerly Utilized Sites Remedial Action Program and Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Fiore, J.J.; Turi, G.P.

    1988-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to identify, evaluate, and as appropriate, conduct remedial actions at sites used in the early years of nuclear energy development by the Manhattan Engineer District and the Atomic Energy Commission (AEC). This program currently has 29 sites and is evaluating 350 other sites for possible inclusion in the program. Another remedial action program in the Department of Energy's (DOE) Division of Facility and Site Decommissioning Projects is the Surplus Facilities Management Program (SFMP). The SFMP involves the safe management, decontamination and disposal of surplus DOE contaminated facilities which were not related to defense activities. There are currently 33 projects at 15 different sites in the program. These two programs have made steady progress over the last 10 or so years in cleaning up sites so that they can be reused or released for unrestricted use. Work has been completed at 8 of the FUSRAP sites and three of the SFMP sites

  6. Behaviour Oriented of Leadership and the Utilization of Facilities Toward Students Satisfaction

    OpenAIRE

    Permono, Fannia Juwita; Suryana, Asep

    2015-01-01

    Vocational education is one of the institution to prepare the labors in industries. The aims of study are to describe and analyze behaviour oriented of leadership and the utilization of facilities toward students satisfaction. This study was done by descriptive analytic method. Data were collected by distributing questionnaire. Data were analyzed by using descriptive statistics. The study foundthat general description of the orientation of leadership behavoiur that is implemented by principal...

  7. Leadership skills for the California electric utility industry: A qualitative study

    Science.gov (United States)

    Hubbell, Michael

    The purpose of this qualitative study was to determine the skills and knowledge necessary for leaders in the California electric utility industry in 2020. With rapid industry changes, skills to effectively lead and stay competitive are undetermined. Leaders must manage an increasingly hostile social and political environment, incorporate new technology, and deal with an aging workforce and infrastructure. Methodology. This study utilized a qualitative case study design to determine the factors that influence the skills leaders will require in 2020. It incorporated the perspectives of current electric utility leaders while looking with a future lens. Findings. Interviews were conducted with transmission and distribution (T&D) directors at 3 investor-owned public electric utilities headquartered in California. The questions followed an open-ended format to gather responses as perceived by electric utility leaders for each research question category: overall skills, aging workforce, regulation, technology, and leading younger generations. The research resulted in 18 major themes: 5 for overall skills, 3 for aging workforce, 4 for regulation, 3 for technology, and 3 for leading younger generations. Conclusions. The study identified leadership skills including the ability to embrace, leverage, and stay current with technology; understand and provide a clear vision for the future; increase creativity; manage the next set of workers; motivate during a time of great change; prepare for knowledge transfer and change in workforce culture; manage regulatory expectations; expand potential utility opportunities; leverage "big data"; allow worker collaboration; and understand what drives younger generations. Recommendations. California-based electric utility leaders can remain effective by implementing key strategies identified herein. Further research could examine perspectives of additional utility leaders who lead in organizational units outside of T&D, expand the research to

  8. Regional health care planning: a methodology to cluster facilities using community utilization patterns.

    Science.gov (United States)

    Delamater, Paul L; Shortridge, Ashton M; Messina, Joseph P

    2013-08-22

    Community-based health care planning and regulation necessitates grouping facilities and areal units into regions of similar health care use. Limited research has explored the methodologies used in creating these regions. We offer a new methodology that clusters facilities based on similarities in patient utilization patterns and geographic location. Our case study focused on Hospital Groups in Michigan, the allocation units used for predicting future inpatient hospital bed demand in the state's Bed Need Methodology. The scientific, practical, and political concerns that were considered throughout the formulation and development of the methodology are detailed. The clustering methodology employs a 2-step K-means + Ward's clustering algorithm to group hospitals. The final number of clusters is selected using a heuristic that integrates both a statistical-based measure of cluster fit and characteristics of the resulting Hospital Groups. Using recent hospital utilization data, the clustering methodology identified 33 Hospital Groups in Michigan. Despite being developed within the politically charged climate of Certificate of Need regulation, we have provided an objective, replicable, and sustainable methodology to create Hospital Groups. Because the methodology is built upon theoretically sound principles of clustering analysis and health care service utilization, it is highly transferable across applications and suitable for grouping facilities or areal units.

  9. Profitability analysis of grid-connected photovoltaic facilities for household electricity self-sufficiency

    International Nuclear Information System (INIS)

    Colmenar-Santos, Antonio; Campíñez-Romero, Severo; Pérez-Molina, Clara; Castro-Gil, Manuel

    2012-01-01

    Spain exhibits a high level of energy dependence and has significant solar energy resources. These two facts have given rise to the prominence that renewable energy, particularly solar photovoltaic technology, has enjoyed in recent years, supported by a favorable regulatory framework. Currently, the Spanish Government is providing new ways in energy policy to enhance and accelerate the development of low-power photovoltaic generation facilities for self-consumption by introducing energy policies for feed-in payments of surplus electricity. Such facilities are an example of distributed electrical generation with important benefits for the environment and the rest of the electrical system because, when properly managed, they can help improve the system’s stability and reduce overall losses. By analyzing household demand and solar photovoltaic energy resources, the profitability of such facilities is considered in this article, taking into account the technical and economic impact of storage systems and proposing models for feed-in payments of surplus electricity, in an attempt to assess whether this method of electricity generation versus the method of conventionally supplied power from a grid at a regulated tariff can rival each other economically, in terms of parity. - Highlight: ► The use of grid-connected photovoltaic facilities for household electricity self-sufficiency is presented. ► The need for legal frameworks that include retributive mechanisms for the surplus energy is pointed out. ► Two models are proposed for the remuneration of surplus energy generated. ► Models show economic profitability without feed-in-tariff or compensations. ► Facilities described offer ancillary services for grid stability and smart-grid integration.

  10. Report on emergency electrical power supply systems for nuclear fuel cycle and reactor facilities security systems

    International Nuclear Information System (INIS)

    1977-01-01

    The report includes information that will be useful to those responsible for the planning, design and implementation of emergency electric power systems for physical security and special nuclear materials accountability systems. Basic considerations for establishing the system requirements for emergency electric power for security and accountability operations are presented. Methods of supplying emergency power that are available at present and methods predicted to be available in the future are discussed. The characteristics of capacity, cost, safety, reliability and environmental and physical facility considerations of emergency electric power techniques are presented. The report includes basic considerations for the development of a system concept and the preparation of a detailed system design

  11. Report on emergency electrical power supply systems for nuclear fuel cycle and reactor facilities security systems

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    The report includes information that will be useful to those responsible for the planning, design and implementation of emergency electric power systems for physical security and special nuclear materials accountability systems. Basic considerations for establishing the system requirements for emergency electric power for security and accountability operations are presented. Methods of supplying emergency power that are available at present and methods predicted to be available in the future are discussed. The characteristics of capacity, cost, safety, reliability and environmental and physical facility considerations of emergency electric power techniques are presented. The report includes basic considerations for the development of a system concept and the preparation of a detailed system design.

  12. Efficiency Analysis of German Electricity Distribution Utilities : Non-Parametric and Parametric Tests

    OpenAIRE

    von Hirschhausen, Christian R.; Cullmann, Astrid

    2005-01-01

    Abstract This paper applies parametric and non-parametric and parametric tests to assess the efficiency of electricity distribution companies in Germany. We address traditional issues in electricity sector benchmarking, such as the role of scale effects and optimal utility size, as well as new evidence specific to the situation in Germany. We use labour, capital, and peak load capacity as inputs, and units sold and the number of customers as output. The data cover 307 (out of 553) ...

  13. Eddy current analysis by BEM utilizing loop electric and surface magnetic currents as unknowns

    International Nuclear Information System (INIS)

    Ishibashi, Kazuhisa

    2002-01-01

    The surface integral equations whose unknowns are the surface electric and magnetic currents are widely used in eddy current analysis. However, when the skin depth is thick, computational error is increased especially in obtaining electromagnetic fields near the edge of the conductor. In order to obtain the electromagnetic field accurately, we propose an approach to solve surface integral equations utilizing loop electric and surface magnetic currents as unknowns. (Author)

  14. Economic impacts of zebra mussels on drinking water treatment and electric power generation facilities.

    Science.gov (United States)

    Connelly, Nancy A; O'Neill, Charles R; Knuth, Barbara A; Brown, Tommy L

    2007-07-01

    Invasions of nonnative species such as zebra mussels can have both ecological and economic consequences. The economic impacts of zebra mussels have not been examined in detail since the mid-1990s. The purpose of this study was to quantify the annual and cumulative economic impact of zebra mussels on surface water-dependent drinking water treatment and electric power generation facilities (where previous research indicated the greatest impacts). The study time frame was from the first full year after discovery in North America (Lake St. Clair, 1989) to the present (2004); the study area was throughout the mussels' North American range. A mail survey resulted in a response rate of 31% for electric power companies and 41% for drinking water treatment plants. Telephone interviews with a sample of nonrespondents assessed nonresponse bias; only one difference was found and adjusted for. Over one-third (37%) of surveyed facilities reported finding zebra mussels in the facility and almost half (45%) have initiated preventive measures to prevent zebra mussels from entering the facility operations. Almost all surveyed facilities (91%) with zebra mussels have used control or mitigation alternatives to remove or control zebra mussels. We estimated that 36% of surveyed facilities experienced an economic impact. Expanding the sample to the population of the study area, we estimated 267 million dollars (BCa 95% CI = 161 million dollars - 467 million dollars) in total economic costs for electric generation and water treatment facilities through late 2004, since 1989. Annual costs were greater (44,000 dollars/facility) during the early years of zebra mussel infestation than in recent years (30,000 dollars). As a result of this and other factors, early predictions of the ultimate costs of the zebra mussel invasion may have been excessive.

  15. The Characteristic of Molten Heat Salt Storage System Utilizing Solar Energy Combined with Valley Electric

    Directory of Open Access Journals (Sweden)

    LI .Jiu-ru

    2017-02-01

    Full Text Available With the environmental pollution and energy consumption clue to the large difference between peak and valley of power grid,the molten salt heat storage system(MSHSS utilizing solar Energy combined with valley electric is presented for good energy saving and low emissions. The costs of MSHSS utilizing solar Energy combined with valley electric are greatly reduced. The law of heat transfer in molten salt heat storage technology is studied with the method of grey correlation analysis. The results show the effect of elbow sizes on surface convective heat transfer coefficient with different flow velocities.

  16. An analysis of the Spanish electrical utility industry. Economies of scale, technological progress and efficiency

    International Nuclear Information System (INIS)

    Arcos, Angel; De Toledo, Pablo Alvarez

    2009-01-01

    In this paper we propose a model to explain the behaviour of the Spanish electrical utility industry during the period 1987-1997, under the then existing regulatory system (Marco Legal Estable). The paper will study the presence of economies of scale, the effect of technological progress and the differences in the efficiency of the different companies within the market. The paper concludes that the Spanish electrical utility industry was not, in fact, characterized by economies of scale during this period, but witnessed a great improvement in efficiency within that period. All the critical market factors remind stable. (author)

  17. Reducing operating costs: A collaborative approach between industry and electric utilities

    International Nuclear Information System (INIS)

    Tyers, B.; Sibbald, L.

    1993-01-01

    The unit cost of electricity to industrial consumers is expected to increase at a rate of 5% annually in the 1990s. The partnership that has been created between Amoco Canada Petroleum Company and TransAlta Utilities to control the cost of electricity is described. To allow the company to receive lower rates for interruptible power, a number of measures have been taken. The Amoco Whitecourt plant has standby generators in reserve that can be used when utility power is not available. A Pembina compressor can be turned off for up to 12 hours, at 30 minutes notice, without affecting field pressure. At the East Crossfield plant sales gas can be compressed using electricity or a gas-driven engine. Spot market energy is used in a number of plants allowing electric drive alternatives to plant operators and offering short term energy markets. TransAlta invests in electrical equipment such as switchgear as well as transmission lines and transformers. New rate alternatives offered by TransAlta Utilities include review of the need for a demand ratchet, additional time of use rates, unbundling of rates allowing power purchase from alternative sources, rates that follow product costs, reduced rates for conversion of gas to electric drives certain circumstances, energy audits, and power factor credits. 5 figs

  18. Analysis on the Utility of Satellite Imagery for Detection of Agricultural Facility

    Science.gov (United States)

    Kang, J.-M.; Baek, S.-H.; Jung, K.-Y.

    2012-07-01

    Now that the agricultural facilities are being increase owing to development of technology and diversification of agriculture and the ratio of garden crops that are imported a lot and the crops cultivated in facilities are raised in Korea, the number of vinyl greenhouses is tending upward. So, it is important to grasp the distribution of vinyl greenhouses as much as that of rice fields, dry fields and orchards, but it is difficult to collect the information of wide areas economically and correctly. Remote sensing using satellite imagery is able to obtain data of wide area at the same time, quickly and cost-effectively collect, monitor and analyze information from every object on earth. In this study, in order to analyze the utilization of satellite imagery at detection of agricultural facility, image classification was performed about the agricultural facility, vinyl greenhouse using Formosat-2 satellite imagery. The training set of sea, vegetation, building, bare ground and vinyl greenhouse was set to monitor the agricultural facilities of the object area and the training set for the vinyl greenhouses that are main monitoring object was classified and set again into 3 types according the spectral characteristics. The image classification using 4 kinds of supervise classification methods applied by the same training set were carried out to grasp the image classification method which is effective for monitoring agricultural facilities. And, in order to minimize the misclassification appeared in the classification using the spectral information, the accuracy of classification was intended to be raised by adding texture information. The results of classification were analyzed regarding the accuracy comparing with that of naked-eyed detection. As the results of classification, the method of Mahalanobis distance was shown as more efficient than other methods and the accuracy of classification was higher when adding texture information. Hence the more effective

  19. ANALYSIS ON THE UTILITY OF SATELLITE IMAGERY FOR DETECTION OF AGRICULTURAL FACILITY

    Directory of Open Access Journals (Sweden)

    J.-M. Kang

    2012-07-01

    Full Text Available Now that the agricultural facilities are being increase owing to development of technology and diversification of agriculture and the ratio of garden crops that are imported a lot and the crops cultivated in facilities are raised in Korea, the number of vinyl greenhouses is tending upward. So, it is important to grasp the distribution of vinyl greenhouses as much as that of rice fields, dry fields and orchards, but it is difficult to collect the information of wide areas economically and correctly. Remote sensing using satellite imagery is able to obtain data of wide area at the same time, quickly and cost-effectively collect, monitor and analyze information from every object on earth. In this study, in order to analyze the utilization of satellite imagery at detection of agricultural facility, image classification was performed about the agricultural facility, vinyl greenhouse using Formosat-2 satellite imagery. The training set of sea, vegetation, building, bare ground and vinyl greenhouse was set to monitor the agricultural facilities of the object area and the training set for the vinyl greenhouses that are main monitoring object was classified and set again into 3 types according the spectral characteristics. The image classification using 4 kinds of supervise classification methods applied by the same training set were carried out to grasp the image classification method which is effective for monitoring agricultural facilities. And, in order to minimize the misclassification appeared in the classification using the spectral information, the accuracy of classification was intended to be raised by adding texture information. The results of classification were analyzed regarding the accuracy comparing with that of naked-eyed detection. As the results of classification, the method of Mahalanobis distance was shown as more efficient than other methods and the accuracy of classification was higher when adding texture information. Hence the more

  20. A technology-assessment methodology for electric utility planning: With application to nuclear power plant decommissioning

    International Nuclear Information System (INIS)

    Lough, W.T.

    1987-01-01

    Electric utilities and public service commissions have not taken full advantage of the many proven methodologies and techniques available for evaluating complex technological issues. In addition, evaluations performed are deficient in their use of (1) methods for evaluating public attitudes and (2) formal methods of analysis for decision making. These oversight are substantiated through an examination of the literature relevant to electric utility planning. The assessment process known as technology assessment or TA is proposed, and a TA model is developed for route in use in utility planning by electric utilities and state regulatory commissions. Techniques to facilitate public participation and techniques to aid decision making are integral to the proposed model and are described in detail. Criteria are provided for selecting an appropriate technique on a case-by-case basis. The TA model proved to be an effective methodology for evaluating technological issues associated with electric utility planning such as decommissioning nuclear power plants. Through the use of the nominal group technique, the attitudes of a group of residential ratepayers were successfully identified and included in the decision-making process

  1. All Electric Passenger Vehicle Sales in India by 2030: Value proposition to Electric Utilities, Government, and Vehicle Owners

    Energy Technology Data Exchange (ETDEWEB)

    Abhyankar, Nikit [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Gopal, Anand R. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sheppard, Colin [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Park, Won Young [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Phadke, Amol A. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-06-20

    In India, there is growing interest among policymakers, planners, and regulators for aggressive electrification of passenger vehicles. For example, Piyush Goyal, the Minister of State for India’s Ministry of Coal, Power, New and Renewable Energy, announced an aspirational goal of converting all vehicle sales in India to battery electric vehicles (BEVs) by 2030 (Economic Times, 2016). In 2012, India has already announced the National Mission on Electric Mobility (NMEM) sets a countrywide goal of deploying 6 to 7 million hybrid and electric vehicles (EVs) by 2020 (DHI, 2012). A major policy motivation for transport electrification is to reduce India’s oil import dependency. The objective of this paper is to assess the effect of full electrification of vehicle sales in India by 2030 on the key stakeholders such as BEV owners, electric utilities, and the government. Specifically, we attempt to answer the following questions: (a) How does the total vehicle ownership cost of BEVs compare with the conventional vehicles? (b) What is the additional load due BEV charging? (c) What is the impact on the power sector investments, costs, and utility revenue? (d) How can smart BEV charging help renewable energy grid integration? (e) What is the impact on the crude oil imports? (f) What is the impact on the greenhouse gas (GHG) emissions?

  2. Low-Income Community Solar: Utility Return Considerations for Electric Cooperatives

    Energy Technology Data Exchange (ETDEWEB)

    Aznar, Alexandra Y [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Gagne, Douglas A [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-04-05

    The objective of this short report is to identify project structures that make low-income community solar projects more cost-effective, replicable, and scalable, for electric cooperative and municipal utilities. This report explores the tradeoffs between providing energy bill savings for low-income subscribers and utility project returns, as well as some of the key lessons learned from existing successful low-income community solar pilot projects.

  3. On the economics of PURPA auctions. [Contracts between utilities and electricity producers in the USA

    Energy Technology Data Exchange (ETDEWEB)

    Bolle, Friedel (Energiewirtschaftliches Inst. an der Univ. zu Koeln (Germany))

    1991-04-01

    It is shown that, under certain conditions, Public Utility Regulatory Policies Act (PURPA) auctions in the USA theoretically lead to efficient contracts between utilities and producers of electricity. In contrast to normal auctions bidders compete with (potentially non-linear) revenue functions and with non-price attributes. In practice, there are tremendous difficulties in the evaluation of bids which result from the long duration of contracts and from the necessity to evaluate risks and non-price attributes. (author).

  4. Improving the performance of a hybrid electric vehicle by utilization regenerative braking energy of vehicle

    Energy Technology Data Exchange (ETDEWEB)

    Mourad, Mohamed [Automotive and Tractors Department, Faculty of Engineering, Minia University (Egypt)

    2011-07-01

    Environmentally friendly vehicles with range and performance capabilities surpassing those of conventional ones require a careful balance among competing goals for fuel efficiency, performance and emissions. It can be recuperated the energy of deceleration case of the vehicle to reuse it to recharge the storage energy of hybrid electric vehicle and increase the state of charge of batteries under the new conditions of vehicle operating in braking phase. Hybrid electric vehicle has energy storage which allows decreasing required peak value of power from prime mover, which is the internal combustion engine. The paper investigates the relationships between the driving cycle phases and the recuperation energy to the batteries system of hybrid electric vehicle. This work describes also a methodology for integrating this type of hybrid electric vehicle in a simulation program. A design optimization framework is then used to find the best position that we can utilize the recuperation energy to recharge the storage batteries of hybrid electric vehicle.

  5. How integrated resource planning for US electric utilities affects shareholder interests

    International Nuclear Information System (INIS)

    Hadley, S.; Hirst, E.

    1995-01-01

    Integrated resource planning (IRP) seeks to identify the mix of resources that can best meet the future energy-service needs of customers. These resources include new sources, types, and owners of power plants plus demand-side management (DSM) programs. However, little explicit attention is given to utility shareholders in the typical resource-planning proceeding. Because of the complexity of state regulatory practices and tax policies, it seems unlikely that different resources that provide comparable services to customers will yield comparable returns to shareholders. This study examines a typical US investor-owned utility's financial operations and performance using a spreadsheet model we developed for this project. The model simulates an electric utility's financial operations, and produces an annual income statement, balance sheet, and cash-flow statement. We calculated the net present value of realized (cash) return on equity as the primary factor used to represent shareholder interests. We examined shareholder returns for these resources as functions of public utility commission regulation, taxes, and the utility's operating environment. Given the increasingly competitive nature of electricity markets, we examined shareholder returns for these resources in an environment where the utility competes with other suppliers solely on the basis of electricity price. (author)

  6. Tacit Knowledge Capture and the Brain-Drain at Electrical Utilities

    Science.gov (United States)

    Perjanik, Nicholas Steven

    As a consequence of an aging workforce, electric utilities are at risk of losing their most experienced and knowledgeable electrical engineers. In this research, the problem was a lack of understanding of what electric utilities were doing to capture the tacit knowledge or know-how of these engineers. The purpose of this qualitative research study was to explore the tacit knowledge capture strategies currently used in the industry by conducting a case study of 7 U.S. electrical utilities that have demonstrated an industry commitment to improving operational standards. The research question addressed the implemented strategies to capture the tacit knowledge of retiring electrical engineers and technical personnel. The research methodology involved a qualitative embedded case study. The theories used in this study included knowledge creation theory, resource-based theory, and organizational learning theory. Data were collected through one time interviews of a senior electrical engineer or technician within each utility and a workforce planning or training professional within 2 of the 7 utilities. The analysis included the use of triangulation and content analysis strategies. Ten tacit knowledge capture strategies were identified: (a) formal and informal on-boarding mentorship and apprenticeship programs, (b) formal and informal off-boarding mentorship programs, (c) formal and informal training programs, (d) using lessons learned during training sessions, (e) communities of practice, (f) technology enabled tools, (g) storytelling, (h) exit interviews, (i) rehiring of retirees as consultants, and (j) knowledge risk assessments. This research contributes to social change by offering strategies to capture the know-how needed to ensure operational continuity in the delivery of safe, reliable, and sustainable power.

  7. The role of electricity utilities in ensuring environmental compliance of uranium suppliers

    International Nuclear Information System (INIS)

    Lindholm, I.

    2001-01-01

    The Swedish Utilities, Vattenfall Fuel, OKG and BKAB (purchasing uranium and fuel cycle services for all Swedish reactors), have started 'Nuclear Fuel and Environment Project, NFE'. The purpose is to make environmental audits of companies with uranium mines, conversion, isotope enrichment and fuel fabrication facilities. Up to now five environmental audits have been carried out and another three are being processed. (author)

  8. Report of the Task Group on Electrical Safety of Department of Energy facilities

    Energy Technology Data Exchange (ETDEWEB)

    None

    1993-01-01

    The Task Group on Electrical Safety at DOE Facilities (Task Group), which was formally established on October 27, 1992. The Task Group reviewed the electrical safety-related occurrence history of, and conducted field visits to, seven DOE sites chosen to represent a cross section of the Department`s electrical safety activities. The purpose of the field visits was to review, firsthand, electrical safety programs and practices and to gain greater insight to the root causes and corrective actions taken for recently reported incidents. The electrical safety environment of the DOE complex is extremely varied, ranging from common office and industrial electrical systems to large high-voltage power distribution systems (commercial transmission line systems). It includes high-voltage/high-power systems associated with research programs such as linear accelerators and experimental fusion confinement systems. Age, condition, and magnitude of the facilities also varies, with facilities dating from the Manhattan Project, during World War II, to the most modem complexes. The complex is populated by Federal (DOE and other agencies) and contractor employees engaged in a wide variety of occupations and activities in office, research and development, and industrial settings. The sites visited included all of these variations and are considered by the Task Group to offer a valid representation of the Department`s electrical safety issues. The sites visited were Oak Ridge National Laboratory (ORNL), Stanford Linear Accelerator Center (SLAC), Idaho National Engineering Laboratory (INEL), Nevada Test Site (NTS), Savannah River Site (SRS), Hanford Reservation (Hanford), and the Uranium Mill Tailings Remedial Action Project (UMTRA) located at Grand Junction, Colorado.

  9. Electric utility application of wind energy conversion systems on the island of Oahu

    Energy Technology Data Exchange (ETDEWEB)

    Lindley, C.A.; Melton, W.C.

    1979-02-23

    This wind energy application study was performed by The Aerospace Corporation for the Wind Systems Branch of the Department of Energy. The objective was to identify integration problems for a Wind Energy Conversion System (WECS) placed into an existing conventional utility system. The integration problems included environmental, institutional and technical aspects as well as economic matters, but the emphasis was on the economics of wind energy. The Hawaiian Electric Company utility system on the island of Oahu was selected for the study because of the very real potential for wind energy on that island, and because of the simplicity afforded in analyzing that isolated utility.

  10. How the largest electric and gas utility companies administer public relations

    Energy Technology Data Exchange (ETDEWEB)

    Bogart, J.D.

    1979-04-12

    This article describes the findings of a survey conducted by the author in the second half of 1978 to determine the sizes of the public relations staffs of the nation's largest operating electric and gas utilities, their budgets, organizational differences, and specific functions. Common public relations issues and major public relations problems of the utilities are identified, as well as recent trends or changes in budgeting and organization. Some functional variations of public relations departments among utility companies were detected and described.

  11. Feasibility study on utilization of radiation from spent fuel in storage facility

    International Nuclear Information System (INIS)

    Wataru, Masumi; Sakamoto, Kazuaki; Saegusa, Toshiari; Sakaya, Tadatsugu; Fujiwara, Hiroaki.

    1997-01-01

    Spent fuels of nuclear power plant are stored safely until reprocessing because they are radioactive in addition to energy resources. It is foreseen that the amount of the stored spent fuel increases in the long term. Therefore, in the government, discussion on the storage away from reactor is in progress as well as one at reactor. Spent fuel emits a radioactive ray for a long time. In the storage facility, radiation is shielded not to have a detrimental influence upon the health and environment. If radioactive ray is incorrectly handled, it is hazardous for the health and the environment. But, it is very useful if it is properly utilized under a careful management. In the industry, radioactive ray by isotopes (e.g. Co-60) is used widely. In a view of the effective utilization of energy, the promotion of the siting, the regional development and the creation of employment opportunities of local inhabitants, it is preferable to make use of radiation from the spent fuel. In this study, feasibility of utilization of radiation energy from the spent fuel in a storage facility was evaluated. (author)

  12. Evaluation of actual costs of power sources and effects on balance sheets of electric utilities

    International Nuclear Information System (INIS)

    Matsuo, Yuji; Yamaguchi, Yuji; Murakami, Tomoko

    2013-01-01

    After the Fukushima nuclear accident, almost all nuclear power stations continued to stop operation and sharp increase of purchase costs of fossil fuels forced some electric utilities to suffer a deficit. This article presented quantitative analysis of effects of present state on power costs and balance sheets of electric utilities. Levelized costs of electricity increased from 8.6 ¥/kWh (2010) to 11.6 ¥/kWh (2011) and 12.6 ¥/kWh (2012). Total power costs increased from 7.5 Trillion¥(2010) to 9.5 Trillion¥(2011). Due to increase of cost of fossil fuel compensated for nuclear power, electric utilities suffered a net loss of 0.8 Trillion¥ and decreased surplus to 2.5 Trillion¥ in 2011. Net loss of 1.3 Trillion¥ and surplus of 1.2 Trillion¥ was estimated for 2012. This state was beyond the limit of utilities' efforts to reduce costs and uncertain share of power sources became a great risk. Future share of power sources should be judged appropriately from various standpoints (costs, stable supply, energy security and national economic growth) and early public dissemination of new philosophy on share of power sources was highly required. (T. Tanaka)

  13. CONTROL OF NOX EMISSIONS FROM U.S. COAL-FIRED ELECTRIC UTILITY BOILERS

    Science.gov (United States)

    The paper discusses the control of nitrogen oxide (NOx) emissions from U.S. coal-fired electric utility boilers. (NOTE: In general, NOx control technologies are categorized as being either primary or secondary control technologies. Primary technologies reduce the amount of NOx pr...

  14. CONTROL OF MERCURY EMISSIONS FROM COAL-FIRED ELECTRIC UTILITY BOILERS: INTERIM REPORT

    Science.gov (United States)

    The report provides additional information on mercury (Hg) emissions control following the release of "Study of Hazardous Air Pollutant Emissions from Electric Utility Steam Generating Units--Final Report to Congress" in February 1998. Chapters 1-3 describe EPA's December 2000 de...

  15. A Framework for Organizing Current and Future Electric Utility Regulatory and Business Models

    Energy Technology Data Exchange (ETDEWEB)

    Satchwell, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Cappers, Peter [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Schwartz, Lisa C. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Fadrhonc, Emily Martin [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-06-01

    Many regulators, utilities, customer groups, and other stakeholders are reevaluating existing regulatory models and the roles and financial implications for electric utilities in the context of today’s environment of increasing distributed energy resource (DER) penetrations, forecasts of significant T&D investment, and relatively flat or negative utility sales growth. When this is coupled with predictions about fewer grid-connected customers (i.e., customer defection), there is growing concern about the potential for serious negative impacts on the regulated utility business model. Among states engaged in these issues, the range of topics under consideration is broad. Most of these states are considering whether approaches that have been applied historically to mitigate the impacts of previous “disruptions” to the regulated utility business model (e.g., energy efficiency) as well as to align utility financial interests with increased adoption of such “disruptive technologies” (e.g., shareholder incentive mechanisms, lost revenue mechanisms) are appropriate and effective in the present context. A handful of states are presently considering more fundamental changes to regulatory models and the role of regulated utilities in the ownership, management, and operation of electric delivery systems (e.g., New York “Reforming the Energy Vision” proceeding).

  16. Power Struggle: Changing Momentum in the Restructured American Electric Utility System

    International Nuclear Information System (INIS)

    Hirsh, Richard F.

    2004-01-01

    Since the 1970's, producing and distributing electricity were considered as a natural monopoly. They were subjected to state regulation meant to defend the consumers' interest but which in reality enhanced the power of utility managers. The changes that happened since questioned the managers' control over the system. Following the technological stasis that occurred in the production of electricity, the oil crisis, and the awakening of the environmental movement, the Government adopted the Public Utility Regulatory Policies Act in 1978, favoring the coming of cogeneration technologies benefiting the small producers. Market economy tended to replace natural monopoly. Deregulation became a valuable option and was stimulated by the 1992 Energy Policy Act. However, the electrical crisis in California and the recent blackout over part of the continent slowed down the pace of the change

  17. Economies of scale and vertical integration in the investor-owed electric utility industry

    International Nuclear Information System (INIS)

    Thompson, H.G.; Islam, M.; Rose, K.

    1996-01-01

    This report analyzes the nature of costs in a vertically integrated electric utility. Findings provide new insights into the operations of the vertically integrated electric utility and supports earlier research on economics of scale and density; results also provide insights for policy makers dealing with electric industry restructuring issues such as competitive structure and mergers. Overall, results indicate that for most firms in the industry, average costs would not be reduced through expansion of generation, numbers of customers, or the delivery system. Evidently, the combination of benefits from large-scale technologies, managerial experience, coordination, or load diversity have been exhausted by the larger firms in the industry; however many firms would benefit from reducing their generation-to-sales ratio and by increasing sales to their existing customer base. Three cost models were used in the analysis

  18. Implications of the Ontario government's white paper and competition strategies for Ontario's municipal electric utilities

    International Nuclear Information System (INIS)

    Wills, D.L.

    1998-01-01

    The strategies that Municipal Electric Utilities (MEU) should follow to deal with competition were discussed. North Bay Hydro is the 34th largest MEU out of 300 in Ontario but it serves only 23,000 out of 4 million electrical customers in Ontario. Therefore, the main strategy for municipal utilities to ensure their future would be to become part of an alliance and association like the MEA and the SAC - the Strategic Alliance for Competition and Customer Choice. Strong criticism was voiced regarding the contents of the recent Ontario Government White Paper for being vague with regard to electrical distribution and the role of MEUs in Ontario. It was suggested that it is vitally important that MEUs ally themselves with other stakeholders, to resist an Ontario Hydro monopoly, to make sure that prices stay low, to avoid excessive debt and bureaucratic inefficiency, be innovative, and consumer oriented and be prepared to anticipate events and conditions. 3 figs

  19. Digest of current research in the electric-utility industry. Volume 1. Categories 1-5

    International Nuclear Information System (INIS)

    Andrews, K.; Bates, P.; Berkey, R.; Gray, K.; Kindt, C.; O'Gara, M.; Pakulski, R.

    1980-01-01

    The major objective of the Electric Power Research Institute (EPRI) is to be a prime source of information of R and D activities in the field of electric energy. Therefore, EPRI developed the Research and Development Information System (RDIS) which is a computerized data base of research projects sponsored by EPRI and by individual electric utilities throughout the US. The heart of RDIS is a computerized on-line data base containing approximately 7200 records of R and D projects. The data base is organized into 13 major categories: General R and D support, hydroelectric power, nuclear power, fossil fuels, advanced power systems, transmission, distribution, stations and substations, consumer utilization, economics, personnel, area development, and environmental assessment. This issue of the Digest of Current Research, issued annually and published in two volumes, represents the data base as of August 1980. This volume covers categories 1 through 5. Subject and corporate indexes are included

  20. Digest of current research in the electric-utility industry. Volume 2. Categories 6-13

    International Nuclear Information System (INIS)

    Andrews, K.; Bates, P.; Berkey, R.; Gray, K.; Kindt, C.; O'Gara, M.; Pakulski, R.

    1980-01-01

    The major objective of the Electric Power Research Institute (EPRI) is to be a prime source of information of R and D activities in the field of electric energy. Therefore, EPRI developed the Research and Development Information System (RDIS) which is a computerized data base of research projects sponsored by EPRI and by individual electric utilities throughout the US. The heart of RDIS is a computerized on-line data base containing approximately 7200 records of R and D projects. The data base is organized into 13 major categories: General R and D Support, hydroelectric power, nuclear power, fossil fuels, advanced power systems, transmission, distribution, stations and substations, consumer utilization, economics, personnel, area development, and environmental assessment. This issue of the Digest of Current Research, issued annually and published in two volumes represents the data base as of August 1980. This volume covers categories 6 through 13. Subject and corporate indexes are included

  1. Golden Eagle mortality at a utility-scale wind energy facility near Palm Springs, California

    Science.gov (United States)

    Lovich, Jeffrey E.

    2015-01-01

    Golden Eagle (Aquila chrysaetos) mortality associated with wind energy turbines and infrastructure is under-reported and weakly substantiated in the published literature. I report two cases of mortality at a utility-scale renewable energy facility near Palm Springs, California. The facility has been in operation since 1984 and included 460 65KW turbines mounted on 24.4 m or 42.7 m lattice-style towers with 8 m rotor diameters. One mortality event involved a juvenile eagle that was struck and killed by a spinning turbine blade on 31 August, 1995. The tower was 24.4 m high. The other involved an immature female that was struck by a spinning blade on another 24.4 m tower on 17 April, 1997 and was later euthanized due to the extent of internal injuries. Other raptor mortalities incidentally observed at the site, and likely attributable to turbines, included three Red-tailed Hawks (Buteo jamaicensis) found near turbines.

  2. Collaborative jurisdiction in the regulation of electric utilities: A new look at jurisdictional boundaries

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-12-31

    This conference is one of several activities initiated by FERC, DOE and NARUC to improve the dialogue between Federal and State regulators and policymakers. I am pleased to be here to participate in this conference and to address, with you, electricity issues of truly national significance. I would like to commend Ashley Brown and the NARUC Electricity Committee for its foresight in devising a conference on these issues at this critical juncture in the regulation of the electric utility industry. I also would like to commend Chairman Allday and the FERC for their efforts to improve communication between Federal and State electricity regulators; both through FERC`s Public Conference on Electricity Issues that was held last June, and through the FERC/NARUC workshops that are scheduled to follow this conference. These collaborative efforts are important and necessary steps in addressing successfully the many issues facing the electric utility industry those who regulate it, and those who depend upon it - in other words, about everyone.

  3. Deregulation of ESI and privatization of state electric utilities in Thailand

    International Nuclear Information System (INIS)

    Chirarattananon, Surapong; Nirukkanaporn, Supattana

    2006-01-01

    In Thailand, electric supply services have all been taken over by the state and operated under state enterprises since 1968. Under a law empowering its monopoly, state utilities accumulated assets and built up their manpower to expand and operate the power system to serve the whole country. During the time of high growth in power demand in early the1990 s, the government initiated a move to privatize state electric utilities, the pace of which was firmed up after 1997, the year of the financial crash. Engagement of independent power producers (IPPs) through the use of long-term power purchase agreements (PPAs) for supply of electric power into the system operated by state electric utilities was also initiated from the mid 1990s. Total capacity of IPPs and Small Power Producers (SPPs) that sell excess power from cogeneration on to the system) rose and by the late 1990s started to create a constraint on system economic dispatch. In 1999 the National Energy Policy Council (NEPC) approved a recommendation of international consultants to transform the electric supply industry into a structure similar to the system in the United Kingdom. The transformation was proposed to precede corporatization and privatization of state electric utilities. The objectives of deregulation were to revoke the monopoly in ESI, to improve transparency in electricity pricing, to reduce debts of state enterprises, and to improve economic efficiency. Industry participants have voiced strong objection to the industry model proposed. With the change of market structure in UK to the New Electricity Trading Arrangement (NETA), the secretariat of NEPC also proposed a new structure similar to NETA. More acceptance from industry participants have been received for the new structure. However, it has been assumed that the proposed structure would bring improvement in system reliability, drawing investment into power generation in a manner that would be efficient. Tariff has also been expected to become

  4. Deregulation of ESI and privatization of state electric utilities in Thailand

    Energy Technology Data Exchange (ETDEWEB)

    Surapong Chirarattananon; Supattana Nirukkanaporn [Asian Institute of Technology, Pathum Thani (Thailand). Energy Program

    2006-11-15

    In Thailand, electric supply services have all been taken over by the state and operated under state enterprises since 1968. Under a law empowering its monopoly, state utilities accumulated assets and built up their manpower to expand and operate the power system to serve the whole country. During the time of high growth in power demand in the early 1990s, the government initiated a move to privatize state electric utilities, the pace of which was firmed up after 1997, the year of the financial crash. Engagement of independent power producers (IPPs) through the use of long-term power purchase agreements (PPAs) for supply of electric power into the system operated by state electric utilities was also initiated from the mid 1990s. Total capacity of IPPs and Small Power Producers (SPPs) that sell excess power from cogeneration on to the system, rose and by the late 1990s started to create a constraint on system economic dispatch. In 1999 the National Energy Policy Council (NEPC) approved a recommendation of international consultants to transform the electric supply industry into a structure similar to the system in the United Kingdom. The transformation was proposed to precede corporatization and privatization of state electric utilities. The objectives of deregulation were to revoke the monopoly in ESI, to improve transparency in electricity pricing, to reduce debts of state enterprises, and to improve economic efficiency. Industry participants have voiced strong objection to the industry model proposed. With the change of market structure in UK to the New Electricity Trading Arrangement (NETA), the secretariat of NEPC also proposed a new structure similar to NETA. More acceptance from industry participants have been received for the new structure. However, it has been assumed that the proposed structure would bring improvement in system reliability, drawing investment into power generation in a manner that would be efficient. Tariff has also been expected to become

  5. Deregulation of ESI and privatization of state electric utilities in Thailand

    Energy Technology Data Exchange (ETDEWEB)

    Chirarattananon, Surapong [Energy Program, Asian Institute of Technology, PO Box 4, Klong Luang, Pathum Thani 12120 (Thailand)]. E-mail: surapong@ait.ac.th; Nirukkanaporn, Supattana [Energy Program, Asian Institute of Technology, PO Box 4, Klong Luang, Pathum Thani 12120 (Thailand)

    2006-11-15

    In Thailand, electric supply services have all been taken over by the state and operated under state enterprises since 1968. Under a law empowering its monopoly, state utilities accumulated assets and built up their manpower to expand and operate the power system to serve the whole country. During the time of high growth in power demand in early the1990 s, the government initiated a move to privatize state electric utilities, the pace of which was firmed up after 1997, the year of the financial crash. Engagement of independent power producers (IPPs) through the use of long-term power purchase agreements (PPAs) for supply of electric power into the system operated by state electric utilities was also initiated from the mid 1990s. Total capacity of IPPs and Small Power Producers (SPPs) that sell excess power from cogeneration on to the system) rose and by the late 1990s started to create a constraint on system economic dispatch. In 1999 the National Energy Policy Council (NEPC) approved a recommendation of international consultants to transform the electric supply industry into a structure similar to the system in the United Kingdom. The transformation was proposed to precede corporatization and privatization of state electric utilities. The objectives of deregulation were to revoke the monopoly in ESI, to improve transparency in electricity pricing, to reduce debts of state enterprises, and to improve economic efficiency. Industry participants have voiced strong objection to the industry model proposed. With the change of market structure in UK to the New Electricity Trading Arrangement (NETA), the secretariat of NEPC also proposed a new structure similar to NETA. More acceptance from industry participants have been received for the new structure. However, it has been assumed that the proposed structure would bring improvement in system reliability, drawing investment into power generation in a manner that would be efficient. Tariff has also been expected to become

  6. Deregulation of ESI and privatization of state electric utilities in Thailand

    International Nuclear Information System (INIS)

    Surapong Chirarattananon; Supattana Nirukkanaporn

    2006-01-01

    In Thailand, electric supply services have all been taken over by the state and operated under state enterprises since 1968. Under a law empowering its monopoly, state utilities accumulated assets and built up their manpower to expand and operate the power system to serve the whole country. During the time of high growth in power demand in the early 1990s, the government initiated a move to privatize state electric utilities, the pace of which was firmed up after 1997, the year of the financial crash. Engagement of independent power producers (IPPs) through the use of long-term power purchase agreements (PPAs) for supply of electric power into the system operated by state electric utilities was also initiated from the mid 1990s. Total capacity of IPPs and Small Power Producers (SPPs) that sell excess power from cogeneration on to the system, rose and by the late 1990s started to create a constraint on system economic dispatch. In 1999 the National Energy Policy Council (NEPC) approved a recommendation of international consultants to transform the electric supply industry into a structure similar to the system in the United Kingdom. The transformation was proposed to precede corporatization and privatization of state electric utilities. The objectives of deregulation were to revoke the monopoly in ESI, to improve transparency in electricity pricing, to reduce debts of state enterprises, and to improve economic efficiency. Industry participants have voiced strong objection to the industry model proposed. With the change of market structure in UK to the New Electricity Trading Arrangement (NETA), the secretariat of NEPC also proposed a new structure similar to NETA. More acceptance from industry participants have been received for the new structure. However, it has been assumed that the proposed structure would bring improvement in system reliability, drawing investment into power generation in a manner that would be efficient. Tariff has also been expected to become

  7. Strategic avionics technology definition studies. Subtask 3-1A3: Electrical Actuation (ELA) Systems Test Facility

    Science.gov (United States)

    Rogers, J. P.; Cureton, K. L.; Olsen, J. R.

    1994-01-01

    Future aerospace vehicles will require use of the Electrical Actuator systems for flight control elements. This report presents a proposed ELA Test Facility for dynamic evaluation of high power linear Electrical Actuators with primary emphasis on Thrust Vector Control actuators. Details of the mechanical design, power and control systems, and data acquisition capability of the test facility are presented. A test procedure for evaluating the performance of the ELA Test Facility is also included.

  8. Identifying the changes of geo-engineering properties of dunites due to weathering utilizing electrical resistivity tomography (ERT)

    International Nuclear Information System (INIS)

    Ündül, Ömer; Tuğrul, Atiye; Zarif, İ Halil; Özyalın, Şenol

    2015-01-01

    Weathering phenomena have an important role in many construction facilities with varying depths and grades. Due to the anisotropic and heterogeneous nature of weathering profiles of some rocks, uncertainities exist in determining the geo-engineering properties. Geo-electrical studies have been utilized to overcome such uncertainities for various subsurface conditions including the determination of boundaries between weathered and unweathered parts of different rock types.In this study, the electrical resistivity tomography (ERT) results were correlated with conventional methods in determining the effects of weathering on the geo-engineering properties of dunites. During the research, weathering grades were determined by field studies including discontinuity spacings, aperture and properties of fill materials. The detailed petrographical studies, determination of petrophysical properties (e.g. water absorption and effective porosity) and mechanical properties (e.g. unconfined compressive strength (UCS)) constitute the laboratory studies. ERT studies were carried out in a row of sixty electrodes with electrode spacings of 0.5 m utilizing a Wenner–Schlumberger configuration. According to the comparison of the inversion model sections with the weathering profiles obtained by field and laboratory studies it is concluded that the use of ERT with a Wenner–Schlumberger configuration supplies comparable data for wider subsurface areas from the view of weathering and its effect on geo-engineering properties of dunites. In addition, ERT techniques are very useful where conventional techniques are inadequate in determining the full weathering profile. (paper)

  9. Additional Energy Losses from Asymmetric and Non-Sinusoidal Current in an Electrical Facility and Methods of their Reduction

    Directory of Open Access Journals (Sweden)

    Tarasov Evgeniy V.

    2015-01-01

    Full Text Available Influence of the asymmetry and higher harmonics of current on the operation of an electrical facility is analyzed. The level of additional losses from the asymmetric and non-sinusoidal currents is evaluated for a 110 kV electrical network in the Siberian Region of the Russian Federation. Methods for reducing the additional energy losses in the electrical facility are suggested.

  10. Electric portfolio modeling with stochastic water - climate interactions: Implications for co-management of water and electric utilities

    Science.gov (United States)

    Woldeyesus, Tibebe Argaw

    Water supply constraints can significantly restrict electric power generation, and such constraints are expected to worsen with future climate change. The overarching goal of this thesis is to incorporate stochastic water-climate interactions into electricity portfolio models and evaluate various pathways for water savings in co-managed water-electric utilities. Colorado Springs Utilities (CSU) is used as a case study to explore the above issues. The thesis consists of three objectives: Characterize seasonality of water withdrawal intensity factors (WWIF) for electric power generation and develop a risk assessment framework due to water shortages; Incorporate water constraints into electricity portfolio models and evaluate the impact of varying capital investments (both power generation and cooling technologies) on water use and greenhouse gas emissions; Compare the unit cost and overall water savings from both water and electric sectors in co-managed utilities to facilitate overall water management. This thesis provided the first discovery and characterization of seasonality of WWIF with distinct summertime and wintertime variations of +/-17% compared to the power plant average (0.64gal/kwh) which itself is found to be significantly higher than the literature average (0.53gal/kwh). Both the streamflow and WWIF are found to be highly correlated with monthly average temperature (r-sq = 89%) and monthly precipitation (r-sq of 38%) enabling stochastic simulation of future WWIF under moderate climate change scenario. Future risk to electric power generation also showed the risk to be underestimated significantly when using either the literature average or the power plant average WWIF. Seasonal variation in WWIF along with seasonality in streamflow, electricity demand and other municipal water demands along with storage are shown to be important factors for more realistic risk estimation. The unlimited investment in power generation and/or cooling technologies is also

  11. Multiattribute utility analysis as a framework for public participation siting a hazardous waste facility

    International Nuclear Information System (INIS)

    Merkhofer, M.W.; Conway, R.; Anderson, R.G.

    1996-01-01

    How can the public play a role in decisions involving complicated scientific arguments? This paper describes a public participation exercise in which stakeholders used multiattribute utility analysis to select a site for a hazardous waste facility. Key to success was the ability to separate and address the two types of judgements inherent in environmental decisions: technical judgements on the likely consequences of alternative choices and value judgements on the importance or seriousness of those consequences. This enabled technical specialists to communicate the essential technical considerations and allowed stakeholders to establish the value judgements for the decision. Although rarely used in public participation, the multiattribute utility approach appears to provide a useful framework for the collaborative resolution of many complex environmental decision problems

  12. Electricity Use in the Pacific Northwest: Utility Historical Sales by Sector, 1989 and Preceding Years.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1990-06-01

    This report officially releases the compilation of regional 1989 retail customer sector sales data by the Bonneville Power Administration. This report is intended to enable detailed examination of annual regional electricity consumption. It gives statistics covering the time period 1970--1989, and also provides observations based on statistics covering the 1983--1989 time period. The electricity use report is the only information source that provides data obtained from each utility in the region based on the amount of electricity they sell to consumers annually. Data is provided on each retail customer sector: residential, commercial, industrial, direct-service industrial, and irrigation. The data specifically supports forecasting activities, rate development, conservation and market assessments, and conservation and market program development and delivery. All of these activities require a detailed look at electricity use. 25 figs., 34 tabs.

  13. Photovoltaic rural electrification and the electric power utility. Workshop. [Selected Papers

    Energy Technology Data Exchange (ETDEWEB)

    Huacuz, J. M.; Villasenor, F.; Urrutia, M. [eds.] [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1995-12-31

    This document contains the national and international programs about photovoltaic systems for rural electrification and the electric power utility experiences about PV programs. The IERE Workshop was hold from May 8 to 12, 1995 in Cocoyoc, Mexico. It was organized by the Electrical Research Institute of Mexico (Instituto de Investigaciones Electricas (IIE)) and the U.S. Electric Power Research Institute (EPRI). The Workshop was attended by 38 delegates from 13 countries [Espanol] Este documento contiene los programas nacionales e internacionales sobre electrificacion fotovoltaica rural y las experiencias en programas fotovoltaicos de empresas electricas. El taller de trabajo IERE fue realizado los dias del 8 al 12 de mayo de 1995 en Cocoyoc, Mexico. Fue organizado por el Instituto de Investigaciones Electricas (IIE) y el U.S. Electric Power Research Institute (EPRI) (Instituto de Investigaciones de Energia Electrica de Estados Unidos). A este taller de trabajo asistieron 38 delegados de 13 paises

  14. Quality of electric service in utility distribution networks under electromagnetic compatibility principles. [ENEL

    Energy Technology Data Exchange (ETDEWEB)

    Chizzolini, P.; Lagostena, L.; Mirra, C.; Sani, G. (ENEL, Rome Milan (Italy))

    1989-03-01

    The development of electromagnetic compatibility criteria, being worked out in international standardization activities, requires the establishment of the characteristics of public utility distribution networks as a reference ambient. This is necessary for gauging the immunity levels towards users and for defining the disturbance emission limits. Therefore, it is a new way to look at the quality of electric service. Consequently, it is necessary to check and specify, in an homogeneous manner, the phenomena that affect electric service. Use must be made of experimental tests and of the collection and elaboration of operation data. In addition to testing techniques, this paper describes the checking procedures for the quality of electric service as they are implemented in the information system developed by ENEL (Italian Electricity Board) for distribution activities. The first reference data obtained from the national and international fields about voltage shape and supply continuity are also indicated.

  15. Utility regulation-The scope and structure of electrical safety regulation

    International Nuclear Information System (INIS)

    Abbott, Malcolm; Cohen, Bruce

    2011-01-01

    As a consequence of policies in Australia and New Zealand to increase competition in the utilities sector, regulatory agencies have been created in each state to provide independent and authorative advice on matters such as electricity pricing, access to infrastructure, service quality and security of supply. In addition arrangements have been established to maintain safety standards in the industry. The purpose of this paper is to discuss the major issues that have arisen in the creation of regulatory agencies responsible for electrical safety standards in Australia and New Zealand, and how they have impacted on liberalised electricity markets. - Highlights: → Policies in Australia and New Zealand to increase competition have led to the creation of electrical safety agencies. → These agencies have been created in response to perceived market failures. → There is a variance in agencies in terms of their independence and industry coverage. → These agencies have been created at a time of falling fatalities.

  16. Photovoltaic rural electrification and the electric power utility. Workshop. [Selected Papers

    Energy Technology Data Exchange (ETDEWEB)

    Huacuz, J M; Villasenor, F; Urrutia, M [eds.; Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1996-12-31

    This document contains the national and international programs about photovoltaic systems for rural electrification and the electric power utility experiences about PV programs. The IERE Workshop was hold from May 8 to 12, 1995 in Cocoyoc, Mexico. It was organized by the Electrical Research Institute of Mexico (Instituto de Investigaciones Electricas (IIE)) and the U.S. Electric Power Research Institute (EPRI). The Workshop was attended by 38 delegates from 13 countries [Espanol] Este documento contiene los programas nacionales e internacionales sobre electrificacion fotovoltaica rural y las experiencias en programas fotovoltaicos de empresas electricas. El taller de trabajo IERE fue realizado los dias del 8 al 12 de mayo de 1995 en Cocoyoc, Mexico. Fue organizado por el Instituto de Investigaciones Electricas (IIE) y el U.S. Electric Power Research Institute (EPRI) (Instituto de Investigaciones de Energia Electrica de Estados Unidos). A este taller de trabajo asistieron 38 delegados de 13 paises

  17. Region-specific study of the electric utility industry. Phase I, final report

    International Nuclear Information System (INIS)

    Wacaster, A.J.

    1985-07-01

    This report describes the financial background of the electric utility industry in VACAR, reports on the present condition of the industry and then assesses the future of this industry. The Virginia-Carolinas subregion (VACAR) of the Southeastern Electric Reliability Council (SERC) was selected for this regional study because of its cooperativeness and its representative mix of powerplants, for example coal, hydro, nuclear, oil. It was found that the supply of future economic electricity is in jeopardy because of the regulatory process, the increasing risk associated with large scale generating stations and the weakening of the nuclear option. A number of options for the future were considered, including deregulation, government ownership and retaining the present system with modifications. The option selected to improve the present condition of the electricity industry was to make the present system work. The present system is sound, and with modifications, problems could be solved within the existing framework. 8 figs., 4 tabs

  18. From franchise to state commission: Regulation of the electric utility industry, 1907 to 1932

    Science.gov (United States)

    Reutter, Keith Alan

    1997-09-01

    Empirical research into the effects of regulation on industry has been around since the early 1960s. Over the last thirty plus years a number of interesting results have been brought to the fore. For instance, it has been found that regulation of the trucking industry limits entry and increases prices. A similar result has been pointed to in other industries such as commercial airlines and banking. The effect of the state commission form of regulation on the electric utility industry has been less conclusive. State commissions became dominant during the period 1910-1930, replacing local franchising as a method of regulating the electric utility industry. Two competing theories suggest why this transformation took place, the "capture" and "public interest" theories of regulation. The capture theory of regulation suggests that the electric utility industry demanded state regulation as a way to earn above normal profits and reduce competition. The public interest theory suggests the purpose of regulation by state commissions was to benefit the general public by forcing the industry to be competitive. Few studies have tried to determine which theory more aptly describes the actual events that took place. The empirical model developed in Chapter V, is an extension of the current literature. A set of simultaneous equations describing the natural gas and electricity markets is estimated using cross-sectional time-series data from 1907 to 1932. The effect of regulation on the electric utility industry is modeled with a dummy variable taking on a value of one to designate that a state commission had been established. The results suggest the capture theory of regulation best describes the period under study. The empirical estimates indicate that state commissions (1) reduced the rate at which the real price of electricity was falling, (2) had a negative impact on firms entering the industry, (3) had a positive influence on the cost of producing a kwh of electricity, and (4

  19. Operational, cost, and technical study of large windpower systems integrated with an existing electric utility. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Ligon, C.; Kirby, G.; Jordan, D.; Lawrence, J.H.; Wiesner, W.; Kosovec, A.; Swanson, R.K.; Smith, R.T.; Johnson, C.C.; Hodson, H.O.

    1976-04-01

    Detailed wind energy assessment from the available wind records, and evaluation of the application of wind energy systems to an existing electric utility were performed in an area known as the Texas Panhandle, on the Great Plains. The study area includes parts of Texas, eastern New Mexico, the Oklahoma Panhandle and southern Kansas. The region is shown to have uniformly distributed winds of relatively high velocity, with average wind power density of 0.53 kW/m/sup 2/ at 30 m height at Amarillo, Texas, a representative location. The annual period of calm is extremely low. Three separate compressed air storage systems with good potential were analyzed in detail, and two potential pumped-hydro facilities were identified and given preliminary consideration. Aquifer storage of compressed air is a promising possibility in the region.

  20. 49 CFR 195.575 - Which facilities must I electrically isolate and what inspections, tests, and safeguards are...

    Science.gov (United States)

    2010-10-01

    ... electrical transmission tower footings, ground cables, or counterpoise, or in other areas where it is... Corrosion Control § 195.575 Which facilities must I electrically isolate and what inspections, tests, and... other structures as a single unit. (b) You must install one or more insulating devices where electrical...

  1. Consideration of environmental externality costs in electric utility resource selections and regulation

    International Nuclear Information System (INIS)

    Ottinger, R.L.

    1990-01-01

    A surprising number of state electric utility regulatory commissions (half) have started to require consideration of environmental externality costs in utility planning and resource selection. The principal rationale for doing so is that electric utility operations impose very real and large damages to human health and the environment which are not taken into account by traditional utility least cost planning, resource selection procedures, or by government pollution regulation. These failures effectively value the residual environmental costs to society of utility operations at zero. The likely future prospect for more stringent governmental pollution regulation renders imprudent the selection of resources without taking environmental externality costs into consideration. Most regulatory commissions requiring environmental externality consideration have left it to the utilities to compute the societal costs, although a few have either set those costs themselves or used a proxy adder to polluting resource costs (or bonus for non-polluting resources). These commissions have used control or pollution mitigation costs, rather than societal damage costs, in their regulatory computations. This paper recommends that damage costs be used where adequate studies exist to permit quantification, discusses the methodologies for their measurement, and describes the means that have been and might be used for their incorporation

  2. SUPER-CAPACITOR APPLICATION IN ELECTRICAL POWER CABLE TESTING FACILITIES IN THERMAL ENDURANCE AND MECHANICAL BRACING TESTS

    Directory of Open Access Journals (Sweden)

    I. V. Oleksyuk

    2015-01-01

    Full Text Available The current-carrying cores of the electrical power cables should be resistant to effects of short-circuit currents whose values depend on the material of the core, its cross-sectional area, cable insulation properties, environment temperature, and the duration of the short-circuit current flow (1 and 3–4 sec. when tested for thermal endurance and mechanical bracing. The facilities for testing the 10 kV aluminum core cables with short-circuit current shall provide mechanical-bracing current 56,82 kA and thermal endurance current 11,16 kA. Although capacitors provide such values of the testing currents to the best advantage, utilizing conventional capacitor-units will involve large expenditures for erecting and  running a separate building. It is expedient to apply super-capacitors qua the electric power supply for testing facilities, as they are capacitors with double-electrical layer and involve the current values of tens of kilo-amperes.The insulation voltage during short-circuit current testing being not-standardized, it is not banned to apply voltages less than 10 kV when performing short-circuit thermal endurance and mechanical bracing tests for electrical power cables of 10 kV. The super-capacitor voltage variation-in-time graph consists of two regions: capacitive and resistive. The capacitive part corresponds to the voltage change consequent on the energy change in the super-capacitors. The resistive part shows the voltage variation due to the active resistance presence in the super-capacitor.The author offers the algorithm determining the number of super capacitors requisite for testing 10 kV-electrical power cables with short-circuit currents for thermal endurance and mechanical bracing. The paper shows that installation of super-capacitors in the facilities testing the cables with short-circuit currents reduces the area needed for the super-capacitors in comparison with conventional capacitors more than by one order of magnitude.

  3. Trends in transmission, distribution, and administration costs for U.S. investor-owned electric utilities

    International Nuclear Information System (INIS)

    Fares, Robert L.; King, Carey W.

    2017-01-01

    This paper analyzes the cost of transmission, distribution, and administration for U.S. investor-owned electric utilities. We analyze data reported to the Federal Energy Regulatory Commission (FERC) from 1994 to 2014 using linear regression to understand how the number of customers in a utility's territory, annual peak demand, and annual energy sales affect annual TD&A spending. Then, we use Edison Electric Institute data for 1960 to 1992 to show trends in TD&A spending between 1960 and 2014. We find that the number of customers in a utility's territory is the single best predictor for annual TD&A costs. Between 1994 and 2014, the average cost per customer was $119/Customer-Year for transmission, $291/Customer-Year for distribution, and $333/Customer-Year for utility administration. Total TD&A costs per customer have been approximately $700–$800/Customer-Year since 1960, but the cost per kWh of energy sold was significantly higher in the 1960s because the average customer used less than half as much energy annually versus 2014. Thus, TD&A costs per kWh are likely to increase if kWh energy sales decline in the future unless cost recovery is transitioned to a mechanism not based solely on kWh sales. - Highlights: • U.S. investor-owned electric utility delivery costs from 1960? 2014 are investigated. • Transmission, distribution, and utility administrative costs are analyzed separately. • The number of utility customers is the best predictor for annual delivery costs. • Delivery costs per kWh are likely to increase if kWh sales decrease in the future.

  4. The Integration of Renewable Energy Sources into Electric Power Distribution Systems, Vol. II Utility Case Assessments

    Energy Technology Data Exchange (ETDEWEB)

    Zaininger, H.W.

    1994-01-01

    Electric utility distribution system impacts associated with the integration of renewable energy sources such as photovoltaics (PV) and wind turbines (WT) are considered in this project. The impacts are expected to vary from site to site according to the following characteristics: the local solar insolation and/or wind characteristics, renewable energy source penetration level, whether battery or other energy storage systems are applied, and local utility distribution design standards and planning practices. Small, distributed renewable energy sources are connected to the utility distribution system like other, similar kW- and MW-scale equipment and loads. Residential applications are expected to be connected to single-phase 120/240-V secondaries. Larger kW-scale applications may be connected to three+phase secondaries, and larger hundred-kW and y-scale applications, such as MW-scale windfarms, or PV plants, may be connected to electric utility primary systems via customer-owned primary and secondary collection systems. In any case, the installation of small, distributed renewable energy sources is expected to have a significant impact on local utility distribution primary and secondary system economics. Small, distributed renewable energy sources installed on utility distribution systems will also produce nonsite-specific utility generation system benefits such as energy and capacity displacement benefits, in addition to the local site-specific distribution system benefits. Although generation system benefits are not site-specific, they are utility-specific, and they vary significantly among utilities in different regions. In addition, transmission system benefits, environmental benefits and other benefits may apply. These benefits also vary significantly among utilities and regions. Seven utility case studies considering PV, WT, and battery storage were conducted to identify a range of potential renewable energy source distribution system applications. The

  5. The pneumatic carrier facility in Dhruva reactor: commissioning, characterization and utilization

    International Nuclear Information System (INIS)

    Reddy, A.V.R.; Newton Nathaniel, T.; Nair, A.G.C.; Acharya, R.; Lahiri, D.K.; Kulkarni, U.S.; Sengupta, C.; Duraisamy, S.; Shukla, D.K.; Chakrabarty, K.; Ghosh, R.; Mondal, S.K.; Gujar, H.G.

    2007-11-01

    The 100 MWt power Dhruva research reactor, BARC is provided with pneumatic carrier facility (PCF) to carry out R and D work using short-lived (seconds to minutes) radioisotopes in the fields like neutron activation analysis (NAA) and nuclear fission. The samples are kept inside a high density polypropylene capsule (rabbit), which is pneumatically sent to the irradiation position in the core and retrieved after a preset time of irradiation. After the irradiation, radioactivity assay is carried out using high resolution gamma ray spectrometry with HPGe detector coupled to PC based MCA. The availability of high neutron flux (∼ 5 x 10 13 cm -2 s -1 at 50 MWt power) and shorter retrieval time (∼5 seconds) make it possible to measure short-lived isotopes with enhanced sensitivity. This report describes the salient features of this facility, characterization of the neutron spectrum at this irradiation position and its utilization. The PCF is being extensively utilized for analytical applications using NAA as well as nuclear fission studies. A brief description of analysis of some samples of geological, environmental and biological origin, nuclear materials as well as reference materials is included in this report. Protocol and check list for carrying out PCF irradiations and gamma spectrometric assay are also given at the end of the report. (author)

  6. Tariffs and subsidies in Zimbabwe's reforming electricity industry: steering a utility through turbulent times

    International Nuclear Information System (INIS)

    Mangwengwende, S.E.

    2002-01-01

    In 1991, the Government of Zimbabwe adopted a public enterprise reform strategy as part of a World Bank driven Economic Structural Adjustment Programme (ESAP). For the electricity sector, the Government adopted a two-pronged programme of reform - a performance improvement programme (PIP) for the national utility, the Zimbabwe Electricity Supply Authority (ZESA), and a legal and regulatory reform programme for the electricity sector in general. Ten years later, significant success has been achieved in improving the utility's performance in technical operations and customer service. However, there has been very little progress on the legal and regulatory front. This has adversely affected the utility's financial performance, as well as frustrating the Government's efforts in attracting private sector investment. The centrality of the tariff question reflects the importance of the customer or end-user to the power sector reform process. This article outlines the power sector reform experiences in Zimbabwe with special focus on the tariff question. The paper suggests, from the perspective of a utility executive, reasons for the mixed results at ZESA, and lessons for other countries in the region undertaking similar reforms. (Author)

  7. The effect of the Fukushima nuclear accident on stock prices of electric power utilities in Japan

    International Nuclear Information System (INIS)

    Kawashima, Shingo; Takeda, Fumiko

    2012-01-01

    The purpose of this study is to investigate the effect of the accident at the Fukushima Daiichi nuclear power station, which is owned by Tokyo Electric Power Co. (TEPCO), on the stock prices of the other electric power utilities in Japan. Because the other utilities were not directly damaged by the Fukushima nuclear accident, their stock price responses should reflect the change in investor perceptions on risk and return associated with nuclear power generation. Our first finding is that the stock prices of utilities that own nuclear power plants declined more sharply after the accident than did the stock prices of other electric power utilities. In contrast, investors did not seem to care about the risk that may arise from the use of the same type of nuclear power reactors as those at the Fukushima Daiichi station. We also observe an increase of both systematic and total risks in the post-Fukushima period, indicating that negative market reactions are not merely caused by one-time losses but by structural changes in society and regulation that could increase the costs of operating a nuclear power plant.

  8. Remote instrument/electrical wall nozzle replaement in the Defense Waste Processing Facility

    International Nuclear Information System (INIS)

    Heckendorn, F.M. II.

    1983-09-01

    The Defense Waste Processing Facility (DWPF) for waste vitrification at the Savannah River Plant is in the final design stage. Development of remotely replaceable instrument and electrical through-wall wiring is now complete. These assemblies connect the power and control signals from the high radiation environment to the personnel access areas. The ability to replace them will extend the life and lower the cost of the DWPF. 3 references, 22 figures, 2 tables

  9. An analysis of the factors influencing demand-side management activity in the electric utility industry

    Science.gov (United States)

    Bock, Mark Joseph

    Demand-side management (DSM), defined as the "planning, implementation, and monitoring of utility activities designed to encourage consumers to modify their pattern of electricity usage, including the timing and level of electricity demand," is a relatively new concept in the U.S. electric power industry. Nevertheless, in twenty years since it was first introduced, utility expenditures on DSM programs, as well as the number of such programs, have grown rapidly. At first glance, it may seem peculiar that a firm would actively attempt to reduce demand for its primary product. There are two primary explanations as to why a utility might pursue DSM: regulatory mandate, and self-interest. The purpose of this dissertation is to determine the impact these influences have on the amount of DSM undertaken by utilities. This research is important for two reasons. First, it provides insight into whether DSM will continue to exist as competition becomes more prevalent in the industry. Secondly, it is important because no one has taken a comprehensive look at firm-level DSM activity on an industry-wide basis. The primary data set used in this dissertation is the U.S. Department of Energy's Annual Electric Utility Report, Form EIA-861, which represents the most comprehensive data set available for analyzing DSM activity in the U.S. There are four measures of DSM activity in this data set: (1) utility expenditures on DSM programs; (2) energy savings by DSM program participants; and (3) the actual and (4) the potential reductions in peak load resulting from utility DSM measures. Each is used as the dependent variable in an econometric analysis where independent variables include various utility characteristics, regulatory characteristics, and service territory and customer characteristics. In general, the results from the econometric analysis suggest that in 1993, DSM activity was primarily the result of regulatory pressure. All of the evidence suggests that if DSM continues to

  10. Strategic Approach in Enhancing the Utilization of GGH Facilities Towards High Impact of Agrobiotechnology

    International Nuclear Information System (INIS)

    Azhar Mohamad; Ahsanulkhaliqin Abdul Wahab

    2013-01-01

    Gamma greenhouse (GGH) is associates with chronic radiation activities in life organism. The facility is equipped with 137 Cs source with relatively high energy (t 1/2 =30.1 years). The energy associated with gamma radiation is high enough to break the molecular bonds and ionize atoms without affecting structure of the atomic nucleus (avoiding induction of radioactivity). Nuclear Malaysia is the only institute that provides the facility for Research and Development chronic mutagenesis activities in Malaysia. Chronic gamma irradiation is an exposure of ionizing radiation over an extended period (hours, weeks, months) depending on their nature, sensitivity and research requirements. The alteration by chronic irradiation is tremendous, resulting in physical appearance, changes in molecular structures and metabolism changes. These changes are randomly events, inheritable, and the stability depends on cell damages after irradiation at molecular level. In agrobiotechnology, chronic gamma irradiation produces a wider mutation spectrum and useful for minimizing radiation damages towards obtaining new improved traits for commercial values. Continuous expose at low dose of gamma irradiation resulting in considerably elevated somaclonal variation frequency without negative effects on natural response. However, there is still lack of users especially researchers in Malaysia to utilize the facility. Strategic approaches as seminars, public talk, direct connections and engagement through collaboration, research activities and road show approaches are expected to bring more consumers in conveying high impact activities at GGH. (author)

  11. Region-specific study of the electric utility industry: problem identification, analysis, and recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Pochan, M.J.

    1985-07-01

    A number of problems were identified that could stand in the way of maintaining an adequate, reliable and economic supply of electric power for the United States in the future. The problems were analyzed by studying a specific region, VACAR (Virginia-Carolinas), in some detail. It was concluded that the future power supply is in jeopardy, but that drastic changes in the present system of investor-owned utilities, specifically, deregulation or government ownership, were not justified. It was recommended that the present electric system be modified and strengthened to meet future needs. 2 refs., 8 figs., 15 tabs.

  12. Region-specific study of the electric utility industry: problem identification, analysis, and recommendations

    International Nuclear Information System (INIS)

    Pochan, M.J.

    1985-07-01

    A number of problems were identified that could stand in the way of maintaining an adequate, reliable and economic supply of electric power for the United States in the future. The problems were analyzed by studying a specific region, VACAR (Virginia-Carolinas), in some detail. It was concluded that the future power supply is in jeopardy, but that drastic changes in the present system of investor-owned utilities, specifically, deregulation or government ownership, were not justified. It was recommended that the present electric system be modified and strengthened to meet future needs. 2 refs., 8 figs., 15 tabs

  13. Advanced exergoenvironmental assessment of a natural gas-fired electricity generating facility

    International Nuclear Information System (INIS)

    Açıkkalp, Emin; Aras, Haydar; Hepbasli, Arif

    2014-01-01

    Highlights: • Advanced exergoenvironmental analysis was conducted for an electricity generating facility. • Exergy destructions and environmental effects were divided into parts. • Environmental relations between the components were determined. • Environmental improvement strategies of the system were determined. - Abstract: This paper presents conventional and advanced exergoenvironmental analyses of an electricity generation facility located in the Eskisehir Industry Estate Zone, Turkey. This facility consists of gas turbine and steam cycles, which generate electrical power of approximately 37 MW and 18 MW, respectively. Exergy efficiency of the system is 0.402 and exergy destruction rate of the system is 78.242 MW. Unit exergy cost of electrical power generated by the system is 25.66 $/GJ and total exergoeconomic factor of the system is 0.279. Conventional exergy analysis method was applied to the system first. Next, exergy environmental impacts of exergy destruction rate within the facility’s components were divided into four parts generally, as endogenous, exogenous, avoidable and unavoidable environmental impact of exergy destruction rate. Through this analysis, improvement potential of the environmental impacts of the components and the overall system and the environmental relations between the components were then determined. Finally, exergoenvironmental factor was determined as 0.277 and environmental impact of the electricity was 8.472 (Pts/h). The system has 33% development potential for environmental impacts while its components have weak relations because of big endogenous parts of environmental impacts (80%). It may be concluded that advanced exergoenvironmental analysis indicated that priority should be given to the GT and CC, while defining the improvement strategies

  14. European utility requirements: common rules to design next LWR plants in an open electricity market

    International Nuclear Information System (INIS)

    Berbey, Pierre; Ingemarsson, Karl-Fredrik

    2004-01-01

    The major European electricity producers want to keep able to build new nuclear power plants and they believe 3. generation LWRs would be the most adapted response to their needs in the first decades of this century. Producing a common European Utility Requirement (EUR) document has been one of the basic tasks towards this objective. In this common frame, standardized and competitive LWR NPPs could be developed and offered to the investors. This idea is now well supported by all the other actors on the European electricity market: vendors, regulators, grid managers, administrations although in the competitive and unified European electricity market that is emerging, the electricity producers' stakes are more and more different from the other electricity business actors'. The next term objectives of the electricity producers involved in EUR are focused on negotiating common rules of the game together with the regulators. This covers the nuclear safety approaches, the conditions requested to connect a plant to a HV grid, as well as the design standards. Discussions are going on between the EUR organization and all the corresponding bodies to develop stabilized and predictable design rules that would meet the constraints of nuclear electricity generation in this new environment. Finally there cannot be competition without competitors. The EUR organization has proven to be the right place to establish trustful relationship between the vendors and their potential customers, through fair assessment of the proposed designs performance vs. the utility needs. This will be continued and developed with the main vendors present in Europe, so as to keep alive a list of 4 to 6 designs 'qualified', i.e. showing an acceptable score of non-compliance vs. EUR. (authors)

  15. Spot markets vs. long-term contracts - modelling tools for regional electricity generating utilities

    International Nuclear Information System (INIS)

    Grohnheit, P.E.

    1999-01-01

    A properly organised market for electricity requires that some information will be available for all market participants. Also a range of generally available modelling tools are necessary. This paper describes a set of simple models based on published data for analyses of the long-term revenues of regional utilities with combined heat and power generation (CHP), who will operate a competitive international electricity market and a local heat market. The future revenues from trade on the spot market is analysed using a load curve model, in which marginal costs are calculated on the basis of short-term costs of the available units and chronological hourly variations in the demands for electricity and heat. Assumptions on prices, marginal costs and electricity generation by the different types of generating units are studied for selected types of local electricity generators. The long-term revenue requirements to be met by long-term contracts are analysed using a traditional techno-economic optimisation model focusing on technology choice and competition among technologies over 20.30 years. A possible conclusion from this discussion is that it is important for the economic and environmental efficiency of the electricity market that local or regional generators of CHP, who are able to react on price signals, do not conclude long-term contracts that include fixed time-of-day tariff for sale of electricity. Optimisation results for a CHP region (represented by the structure of the Danish electricity and CHP market in 1995) also indicates that a market for CO 2 tradable permits is unlikely to attract major non-fossil fuel technologies for electricity generation, e.g. wind power. (au)

  16. 18 CFR 141.400 - FERC Form No. 3-Q, Quarterly financial report of electric utilities, licensees, and natural gas...

    Science.gov (United States)

    2010-04-01

    ..., Quarterly financial report of electric utilities, licensees, and natural gas companies. 141.400 Section 141..., licensees, and natural gas companies. (a) Prescription. The quarterly report of electric utilities, licensees, and natural gas companies, designated as FERC Form No. 3-Q, is prescribed for the reporting...

  17. 18 CFR 260.300 - FERC Form No. 3-Q, Quarterly financial report of electric utilities, licensees, and natural gas...

    Science.gov (United States)

    2010-04-01

    ..., Quarterly financial report of electric utilities, licensees, and natural gas companies. 260.300 Section 260... ENERGY APPROVED FORMS, NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.300 FERC Form No. 3-Q, Quarterly financial report of electric utilities, licensees, and natural gas companies. (a) Prescription...

  18. A Comparative Case Study of Electric Utility Companies’ Use of Energy Democracy in Strategic Communication

    Directory of Open Access Journals (Sweden)

    Meaghan McKasy

    2018-02-01

    Full Text Available A substantial increase in distributed renewable energy resources is changing the face of the energy environment, leading to strategic communication efforts by key stakeholders. The energy democracy movement supports this transformation from fossil fuels to distributed renewable energy and aims for equitable involvement of publics in energy decision making. These tenets challenge utility company earnings as they are directly related to energy sales and infrastructure returns on investment. Proposals by electric utility companies to restructure net-metering policies as a solution to financial issues have been criticized as prohibitive to the success of renewable energy advancement. To address these disagreements, the Edison Electric Institute and a communication firm, Maslansky & Partners, created The Future of Energy: A Working Communication Guide for Discussion. This handbook provides utility companies with strategic communication guidelines to portray themselves as supportive of renewables within a dynamic energy industry. We posit that aspects of the energy democracy movement have been employed by electric utility companies, as shown through the use of the handbook, as a strategy for communicating with customers in discussions around net metering. We examine two case studies in states with recent controversial net-metering policy changes by analyzing utility company websites and press releases for the use of the communication handbook terminology. We found that, in both cases, the suggested language was used to position their companies as pro-renewable energy and their utility-scale projects as more equitable for their customers. In addition, we found differences between each company’s use of key terms from the handbook. We posit that this is due to the temporal context of each net-metering debate at the time of the handbook release. Conclusions and future directions for research in the growing area of energy democracy are discussed.

  19. An assessment of the potential contribution from waste-to-energy facilities to electricity demand in Saudi Arabia

    International Nuclear Information System (INIS)

    Ouda, Omar K.M.; Cekirge, Huseyin M.; Raza, Syed A.R.

    2013-01-01

    Highlights: • This research evaluates the potential contribution of WTE to Saudi power demand. • Two scenarios were developed: Mass Burn and Mass Burn with recycling to year 2032. • Mass Burn will generate 2073 Megawatts (MW) about 1.73% of 2032 peak power demand. • Mass Burn with recycling will generate 166 MW about 0.14% of 2032 peak power demand. - Abstract: The Kingdom of Saudi Arabia (KSA) is the largest crude oil producer in the world and possesses the largest oil reserves. The crude oil revenue has resulted in a massive socio-economic development over the last four decades. This situation has resulted in rapid growth of the country’s electricity demand and municipal solid waste (MSW) generation. The KSA is proposing an impressive plan towards renewable energy utilization that includes waste-to-energy (WTE) facilities. This research assesses the potential contribution of WTE facilities to total Saudi peak power demand up to the year 2032 based on two scenarios: Mass Burn and Mass Burn with recycling for the entire country and for six major cities in the KSA. The analysis shows a potential to produce about 2073 Megawatts (MW) based on a Mass Burn scenario and about 166 MW based on Mass Burn with recycling scenario. These values amount to about 1.73% and 0.14% of the projected 2032 peak electricity demand of 120 Gigawatt. The forecasted results of each city from the two scenarios can be used to design future WTE facilities in the main cities of Saudi Arabia. Further investigations are recommended to evaluate the two scenarios based on financial, social, technical, and environmental criteria

  20. Sustainable Governance for the Opened Electric Vehicle Charging and Upgraded Facilities Market

    Directory of Open Access Journals (Sweden)

    Tian Wu

    2017-11-01

    Full Text Available Since the China State Grid opened the market for infrastructure construction of electric charging stations and allowed Tesla, Potevio, BAIC BJEV and other enterprises to provide their own charging stations and other infrastructure construction, the development of electric vehicles has been greatly affected. How to maintain a sustainable governance in the opened electric vehicle charging and upgraded facilities market is an important policy issues. This paper presents a monopolistic competition model for the differentiated products market and addresses several issues related to Cournot equilibrium to illustrate why the expected free market actually operates in a monopolistic competition market structure. The analytic solution of the model shows that whether the extent of firm entry is insufficient, excessive or optimum is determined by consumers’ time preference, level of production differentiation and features of cost structure, including fixed cost and marginal cost. The sensitivity analysis has been performed among the above factors and tracked some other factors which would determine the effect of the new policy issues. The main policy suggestion is that the government should optimize entry regulations and lay down the criterion of charging interface standards for charging stations to avoid the electric vehicle charging and upgraded facilities marketization process of a one-size-fits-all solution and form a monopolistic competition market.

  1. Economic evaluations of fusion-based energy storage systems in an electric utility

    International Nuclear Information System (INIS)

    Hwang, W.G.

    1977-01-01

    The feasibility of introducing a fusion energy storage system, which consists of a fusion-fission reactor and a water-splitting process, in an electric utility was investigated. The fusion energy storage system was assumed to be run during off-peak periods in order to make use of unused, low fuel cost capacity of an electric utility. The fusion energy storage system produces both fissile fuel and hydrogen. The produced hydrogen was assumed to be transmitted through and stored in existing natural gas trunklines for later use during peak-load hours. The peaking units in the utility were assumed to burn the hydrogen. Reserve power is usually cheap on systems with heavy nuclear fission reactor installation. The system studied utilizes this cheap energy for producing expensive fuel. The thermochemical water-splitting process was employed to recover thermal energy from the fusion-fission reactor system. The cost of fusion energy storage systems as well as the value of produced fuel were calculated. In order to simulate the operations of the fusion energy storage system for a multi-year planning period, a computer program, FESUT (Fusion Energy Simulation at the University of Texas), was developed for the present study. Two year utility simulations with the fusion energy storage system were performed

  2. Why electric utilities and affiliates are handicapped in a partly regulated and partly competitive environment

    Energy Technology Data Exchange (ETDEWEB)

    St.Marie, S.M.

    1999-11-01

    As the electric utility industry continues to go through the process of restructuring, utilities are finding themselves operating not only as regulated entities but also as firms that compete for customers and sales. Some services, including services associated with distribution, are being unbundled or peeled off from the core of operations and, where possible, are being opened to competition. But these partly regulated and partly competitive areas are treacherous for utilities and their affiliates, who will be handicapped in their competitive efforts and subject to constraints not placed on their competitors. There are good reasons why such difficulties should be expected. And there are guidelines for pricing and competitive positioning that can assist in avoiding the worst problems. The first step is to recognize the archetypes of the regulated electric distribution utility and the competitive firm. In plotting their deregulation strategies, utilities and their affiliates must recognize that they will continue to be disadvantaged by regulators who are more concerned with keeping them in check than freeing them to compete.

  3. Why electric utilities and affiliates are handicapped in a partly regulated and partly competitive environment

    International Nuclear Information System (INIS)

    St Marie, S.M.

    1999-01-01

    As the electric utility industry continues to go through the process of restructuring, utilities are finding themselves operating not only as regulated entities but also as firms that compete for customers and sales. Some services, including services associated with distribution, are being unbundled or peeled off from the core of operations and, where possible, are being opened to competition. But these partly regulated and partly competitive areas are treacherous for utilities and their affiliates, who will be handicapped in their competitive efforts and subject to constraints not placed on their competitors. There are good reasons why such difficulties should be expected. And there are guidelines for pricing and competitive positioning that can assist in avoiding the worst problems. The first step is to recognize the archetypes of the regulated electric distribution utility and the competitive firm. In plotting their deregulation strategies, utilities and their affiliates must recognize that they will continue to be disadvantaged by regulators who are more concerned with keeping them in check than freeing them to compete

  4. Moving from Outsider to Insider: Peer Status and Partnerships between Electricity Utilities and Residential Consumers

    Science.gov (United States)

    Morris, Peter; Buys, Laurie; Vine, Desley

    2014-01-01

    An electricity demand reduction project based on comprehensive residential consumer engagement was established within an Australian community in 2008. By 2011, both the peak demand and grid supplied electricity consumption had decreased to below pre-intervention levels. This case study research explored the relationship developed between the utility, community and individual consumer from the residential customer perspective through qualitative research of 22 residential households. It is proposed that an energy utility can be highly successful at peak demand reduction by becoming a community member and a peer to residential consumers and developing the necessary trust, access, influence and partnership required to create the responsive environment to change. A peer-community approach could provide policymakers with a pathway for implementing pro-environmental behaviour for low carbon communities, as well as peak demand reduction, thereby addressing government emission targets while limiting the cost of living increases from infrastructure expenditure. PMID:24979234

  5. Electric utility engineer`s FGD manual -- Volume 1: FGD process design. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-04

    Part 1 of the Electric Utility Engineer`s Flue Gas Desulfurization (FGD) Manual emphasizes the chemical and physical processes that form the basis for design and operation of lime- and limestone-based FGD systems applied to coal- or oil-fired steam electric generating stations. The objectives of Part 1 are: to provide a description of the chemical and physical design basis for lime- and limestone-based wet FGD systems; to identify and discuss the various process design parameters and process options that must be considered in developing a specification for a new FGD system; and to provide utility engineers with process knowledge useful for operating and optimizing a lime- or limestone-based wet FGD system.

  6. Electrical hand tools and techniques: A compilation. [utilization of space technology for tools and adapters

    Science.gov (United States)

    1974-01-01

    Space technology utilization for developing tools, adapters, and fixtures and procedures for assembling, installing, and servicing electrical components and equipment are discussed. Some of the items considered are: (1) pivotal screwdriver, (2) termination locator tool for shielded cables, (3) solder application tools, (4) insulation and shield removing tool, and (5) torque wrench adapter for cable connector engaging ring. Diagrams of the various tools and devices are provided.

  7. Electric utility system benefits of factory packaged GE LM Modular Generator sets

    Energy Technology Data Exchange (ETDEWEB)

    West, G.

    1994-12-31

    Electric utility system benefits of factory packaged GE LM modular generator sets are outlined. The following topics are discussed: GE LM gas turbine history, operating experience, maintenance, gas turbine spare engines, modular gas turbine generator sets, typical LM2500 cogeneration plant and STIG cycle plant, factory packaging concept, gas turbine/generator package, performance, comparison, competitive capital cost, phased construction, comparison of revenue requirements, capacity evaluation, heat rate evaluation, fuel evaluation, startup, and dispatch flexibility without maintenance penalty.

  8. Hydro and After: The Canadian Experience with the Organization, Nationalization and Deregulation of Electrical Utilities

    International Nuclear Information System (INIS)

    Nelles, Henry Vivian

    2003-01-01

    This paper surveys the process of nationalization and some recent steps towards denationalization in a distinctive Canadian institutional setting, the provincial hydro-electric power utilities. The richest, most industrialized central province, Ontario, established a dynamic publicly owned electric generation and distribution system before World War I. Most other provinces developed variations of the regulatory model to govern private monopolies until the post World War II period when widespread nationalization at the provincial level created a near universal pattern of state owned electric companies. Recently, the process of dismantling state monopolies in this sector has begun in two provinces, one where public ownership was weakest, and the other where the concept of 'provincial hydro' was born

  9. Renewable Electricity Benefits Quantification Methodology: A Request for Technical Assistance from the California Public Utilities Commission

    Energy Technology Data Exchange (ETDEWEB)

    Mosey, G.; Vimmerstedt, L.

    2009-07-01

    The California Public Utilities Commission (CPUC) requested assistance in identifying methodological alternatives for quantifying the benefits of renewable electricity. The context is the CPUC's analysis of a 33% renewable portfolio standard (RPS) in California--one element of California's Climate Change Scoping Plan. The information would be used to support development of an analytic plan to augment the cost analysis of this RPS (which recently was completed). NREL has responded to this request by developing a high-level survey of renewable electricity effects, quantification alternatives, and considerations for selection of analytic methods. This report addresses economic effects and health and environmental effects, and provides an overview of related analytic tools. Economic effects include jobs, earnings, gross state product, and electricity rate and fuel price hedging. Health and environmental effects include air quality and related public-health effects, solid and hazardous wastes, and effects on water resources.

  10. Utilization of surplus electricity from wind power for dynamic biogas upgrading

    DEFF Research Database (Denmark)

    Jurgensen, Lars; Ehimen, Ehiazesebhor Augustine; Born, Jens

    2014-01-01

    The methanation of CO2 has been increasingly discussed for the potential long term storage of electricity and for facilitating grid load management. Using the regions of northern Germany as a case study, the feasibility of CO2 conversion from biogas plants and its integration in existing natural...... gas grid was examined in this study. Furthermore the material and energy flows of in the methanation process, were evaluated to provide expression for the quantities of excess electrical energy which could be potentially stored using the biogas integrated systems. The study results showed...... that with 480 biogas plants in the region would be able to utilize up to 0.7 TWh surplus electricity could be used to produce 100 106 m3 at standard temperature and pressure of upgraded methane per year....

  11. X - FACTOR EVALUATION UNDER RPI-X REGULATION FOR INDIAN ELECTRICITY DISTRIBUTION UTILITIES

    Directory of Open Access Journals (Sweden)

    PAVAN KHETRAPAL

    2017-07-01

    Full Text Available With regulators’ growing interest in improving operational efficiency and quality supply, the time is nearing when performance based regulation will become norm for regulating the distribution tariff in Indian electricity distribution sector. In this context, the State Electricity Regulatory Commissions proposed replacing rate-of-return regulation with most commonly used performance based regulatory regime, i.e., Price Cap regulation also known as RPI-X (Retail Price Index - Productivity Offset regulatory framework. However, the potential problem associated with applying price cap regulation scheme in practice is the determination of productivity offset or X factor used in price caps setting. This paper proposed an approach to calculate the X-factor for 58 government-owned and privately-owned electricity distribution utilities in India during a five year period from 2007/08 to 2011/12. A Stochastic Frontier model through an input distance function is first applied to compute the Malmquist Total Factor Productivity (TFP and the estimated TFP is then used to calculate the utility-specific X-factor. With rely on calculated X-factor, the distribution utilities would be able to cap either on prices or revenues thus accounting the inflation in the tariff determination. This will be more realistic approach as compared to cost plus approach.

  12. Survey and analysis of selected jointly owned large-scale electric utility storage projects

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-01

    The objective of this study was to examine and document the issues surrounding the curtailment in commercialization of large-scale electric storage projects. It was sensed that if these issues could be uncovered, then efforts might be directed toward clearing away these barriers and allowing these technologies to penetrate the market to their maximum potential. Joint-ownership of these projects was seen as a possible solution to overcoming the major barriers, particularly economic barriers, of commercializaton. Therefore, discussions with partners involved in four pumped storage projects took place to identify the difficulties and advantages of joint-ownership agreements. The four plants surveyed included Yards Creek (Public Service Electric and Gas and Jersey Central Power and Light); Seneca (Pennsylvania Electric and Cleveland Electric Illuminating Company); Ludington (Consumers Power and Detroit Edison, and Bath County (Virginia Electric Power Company and Allegheny Power System, Inc.). Also investigated were several pumped storage projects which were never completed. These included Blue Ridge (American Electric Power); Cornwall (Consolidated Edison); Davis (Allegheny Power System, Inc.) and Kttatiny Mountain (General Public Utilities). Institutional, regulatory, technical, environmental, economic, and special issues at each project were investgated, and the conclusions relative to each issue are presented. The major barriers preventing the growth of energy storage are the high cost of these systems in times of extremely high cost of capital, diminishing load growth and regulatory influences which will not allow the building of large-scale storage systems due to environmental objections or other reasons. However, the future for energy storage looks viable despite difficult economic times for the utility industry. Joint-ownership can ease some of the economic hardships for utilites which demonstrate a need for energy storage.

  13. The EU's Major Electricity and Gas Utilities since Market Liberalization

    Energy Technology Data Exchange (ETDEWEB)

    Schulke, Ch.

    2010-07-01

    A major change has taken place in the company structure of the European electricity and gas markets. Twenty years ago, national or regional monopolies dominated the markets and there was strictly no competition between utilities. But since the liberalization of EU energy markets began in the 1990's, companies like E.ON, GDF Suez, EDF, Enel, and RWE have become European giants with activities in a large number of Member States. The advocates of market liberalization did not expect, or even intend, the emergence of a small number of large utilities that control an increasing part of the EU market. Some observers already claim that liberalization has led to an oligopoly with detrimental consequences for competition. Based on extensive background research, this book presents a fact-based analysis of the changes in the European utility sector since the 1990's. Case studies of the seven largest utilities illustrate how companies adapted their strategies to the changing market environment. The author underlines diverging choices and common trends like geographic expansion into new markets via mergers and acquisitions or diversification of business activities with the aim of using synergies between electricity and gas. (author)

  14. Financial impacts of nonutility power purchases on investor-owned electric utilities

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    To assist in its these responsibilities in the area of electric power, EIA has prepared this report, Financial Impacts of Nonutility Power Purchases on Investor-Owned Electric Utilities. The primary purpose of this report is to provide an overview of the issues surrounding the financial impacts of nonutility generation contracts (since the passage of the Public Utility Regulatory Policies Act of 1978) on investor-owned utilities. The existing concern in this area is manifest in the provisions of Section 712 of the Energy Policy Act of 1992, which required State regulatory commissions to evaluate various aspects of long-term power purchase contracts, including their impact on investor-owned utilities` cost of capital and rates charged to customers. The EIA does not take positions on policy questions. The EIA`s responsibility is to provide timely, high quality information and to perform objective, credible analyses in support of the deliberations by both public and private decision-makers. Accordingly, this report does not purport to represent the policy positions of the US Department of Energy or the Administration.

  15. Financial impacts of nonutility power purchases on investor-owned electric utilities

    International Nuclear Information System (INIS)

    1994-01-01

    To assist in its these responsibilities in the area of electric power, EIA has prepared this report, Financial Impacts of Nonutility Power Purchases on Investor-Owned Electric Utilities. The primary purpose of this report is to provide an overview of the issues surrounding the financial impacts of nonutility generation contracts (since the passage of the Public Utility Regulatory Policies Act of 1978) on investor-owned utilities. The existing concern in this area is manifest in the provisions of Section 712 of the Energy Policy Act of 1992, which required State regulatory commissions to evaluate various aspects of long-term power purchase contracts, including their impact on investor-owned utilities' cost of capital and rates charged to customers. The EIA does not take positions on policy questions. The EIA's responsibility is to provide timely, high quality information and to perform objective, credible analyses in support of the deliberations by both public and private decision-makers. Accordingly, this report does not purport to represent the policy positions of the US Department of Energy or the Administration

  16. Integrated Electrical and Thermal Grid Facility - Testing of Future Microgrid Technologies

    Directory of Open Access Journals (Sweden)

    Sundar Raj Thangavelu

    2015-09-01

    Full Text Available This paper describes the Experimental Power Grid Centre (EPGC microgrid test facility, which was developed to enable research, development and testing for a wide range of distributed generation and microgrid technologies. The EPGC microgrid facility comprises a integrated electrical and thermal grid with a flexible and configurable architecture, and includes various distributed energy resources and emulators, such as generators, renewable, energy storage technologies and programmable load banks. The integrated thermal grid provides an opportunity to harness waste heat produced by the generators for combined heat, power and cooling applications, and support research in optimization of combined electrical-thermal systems. Several case studies are presented to demonstrate the testing of different control and operation strategies for storage systems in grid-connected and islanded microgrids. One of the case studies also demonstrates an integrated thermal grid to convert waste heat to useful energy, which thus far resulted in a higher combined energy efficiency. Experiment results confirm that the facility enables testing and evaluation of grid technologies and practical problems that may not be apparent in a computer simulated environment.

  17. Electromagnetic Fields Associated with Commercial Solar Photovoltaic Electric Power Generating Facilities.

    Science.gov (United States)

    Tell, R A; Hooper, H C; Sias, G G; Mezei, G; Hung, P; Kavet, R

    2015-01-01

    The southwest region of the United States is expected to experience an expansion of commercial solar photovoltaic generation facilities over the next 25 years. A solar facility converts direct current generated by the solar panels to three-phase 60-Hz power that is fed to the grid. This conversion involves sequential processing of the direct current through an inverter that produces low-voltage three-phase power, which is stepped up to distribution voltage (∼12 kV) through a transformer. This study characterized magnetic and electric fields between the frequencies of 0 Hz and 3 GHz at two facilities operated by the Southern California Edison Company in Porterville, CA and San Bernardino, CA. Static magnetic fields were very small compared to exposure limits established by IEEE and ICNIRP. The highest 60-Hz magnetic fields were measured adjacent to transformers and inverters, and radiofrequency fields from 5-100 kHz were associated with the inverters. The fields measured complied in every case with IEEE controlled and ICNIRP occupational exposure limits. In all cases, electric fields were negligible compared to IEEE and ICNIRP limits across the spectrum measured and when compared to the FCC limits (≥0.3 MHz).

  18. Design and Testing of a Breadboard Electrical Power Control Unit for the Fluid Combustion Facility Experiment

    Science.gov (United States)

    Kimnach, Greg L.; Lebron, Ramon C.

    1999-01-01

    The Fluid Combustion Facility (FCF) Project and the Power Technology Division at the NASA Glenn Research Center (GRC) at Lewis Field in Cleveland, OH along with the Sundstrand Corporation in Rockford, IL are jointly developing an Electrical Power Converter Unit (EPCU) for the Fluid Combustion Facility to be flown on the International Space Station (ISS). The FCF facility experiment contains three racks: A core rack, a combustion rack, and a fluids rack. The EPCU will be used as the power interface to the ISS 120V(sub dc) power distribution system by each FCF experiment rack which requires 28V(sub dc). The EPCU is a modular design which contains three 120V(sub dc)-to-28V(sub dc) full-bridge, power converters rated at 1 kW(sub e) each bus transferring input relays and solid-state, current-limiting input switches, 48 current-limiting, solid-state, output switches; and control and telemetry hardware. The EPCU has all controls required to autonomously share load demand between the power feeds and--if absolutely necessary--shed loads. The EPCU, which maximizes the usage of allocated ISS power and minimizes loss of power to loads, can be paralleled with other EPCUs. This paper overviews the electrical design and operating characteristics of the EPCU and presents test data from the breadboard design.

  19. Report on progress of researches by common utilization of nuclear facilities, for fiscal 1980

    International Nuclear Information System (INIS)

    1981-01-01

    The common utilization of the facilities in the Japan Atomic Energy Research Institute by universities has been carried out for 20 years, and it contributed very much to the progress of the basic researches on atomic energy and the training of the persons concerned to atomic energy. This report is to be published, summarizing the results of researches carried out actively in 1980. The total number of the subjects in the common utilization of reactors and others was 126, and the total number of visitors during one year was 3356 man-day. 19 cold rooms and 6 hot rooms were leased from the JAERI as the university open laboratory, and Ge(Li) semiconductor detectors, multiple pulse height analyzers, gas chromatography, spectrophotometers, Moessbauer effect measuring equipments, X-ray diffraction equipments and others are installed. A minicomputer was installed in 1978, and preparation is in progress so as to be available as a new correlation measuring equipment. A pure Ge semiconductor detector and a 4000-channel multiple pulse height analyzer were additionally installed in 1980. The state of RI management and radiation control in the open laboratory is reported. The abstracts of the research reports are provided. (Kako, I.)

  20. Potential criticality accident at the General Electric Nuclear Fuel and Component Manufacturing Facility, May 29, 1991

    International Nuclear Information System (INIS)

    1991-08-01

    At the General Electric Nuclear Fuel and Component Manufacturing facility, located near Wilmington, North Carolina, on May 28 and 29, 1991, approximately 150 kilograms of uranium were inadvertently transferred from safe process tanks to an unsafe tank located at the waste treatment facility, thus creating the potential for a localized criticality safety problem. The excess uranium was ultimately safely recovered when the tank contents were centrifuged to remove the uranium-bearing material. Subsequently, the US Nuclear Regulatory Commission dispatched an Incident Investigation Team to determine what happened, to identify probable causes, and to make appropriate findings and conclusions. This report describes the incident, the methodology used by the team in its investigation, and presents the team's findings and conclusions. 48 figs., 8 tabs

  1. Context analysis for a new regulatory model for electric utilities in Brazil

    International Nuclear Information System (INIS)

    El Hage, Fabio S.; Rufín, Carlos

    2016-01-01

    This article examines what would have to change in the Brazilian regulatory framework in order to make utilities profit from energy efficiency and the integration of resources, instead of doing so from traditional consumption growth, as it happens at present. We argue that the Brazilian integrated electric sector resembles a common-pool resources problem, and as such it should incorporate, in addition to the centralized operation for power dispatch already in place, demand side management, behavioral strategies, and smart grids, attained through a new business and regulatory model for utilities. The paper proposes several measures to attain a more sustainable and productive electricity distribution industry: decoupling revenues from volumetric sales through a fixed maximum load fee, which would completely offset current disincentives for energy efficiency; the creation of a market for negawatts (saved megawatts) using the current Brazilian mechanism of public auctions for the acquisition of wholesale energy; and the integration of technologies, especially through the growth of unregulated products and services. Through these measures, we believe that Brazil could improve both energy security and overall sustainability of its power sector in the long run. - Highlights: • Necessary changes in the Brazilian regulatory framework towards energy efficiency. • How to incorporate demand side management, behavioral strategies, and smart grids. • Proposition of a market for negawatts at public auctions. • Measures to attain a more sustainable electricity distribution industry in Brazil.

  2. A comparison of hydrogen-fueled fuel cells and combustion engines for electric utility applications

    International Nuclear Information System (INIS)

    Schoenung, S.M.

    2000-01-01

    Hydrogen-fueled systems have been proposed for a number of stationary electric generation applications including remote power generation, load management, distribution system peak shaving, and reliability or power quality enhancement. Hydrogen fueling permits clean, low pollution operation. This is particularly true for systems that use hydrogen produced from electrolysis, rather than the reforming of hydrocarbon fuels. Both fuel cells and combustion engines are suitable technologies for using hydrogen in many electric utility applications. This paper presents results from several studies performed for the U.S. Department of Energy Hydrogen Program. A comparison between the two technologies shows that, whereas fuel cells are somewhat more energy efficient, combustion engine technology is less expensive. In this paper, a comparison of the two technologies is presented, with an emphasis on distributed power and power quality applications. The special case of a combined distributed generation I hydrogen refueling station is also addressed. The comparison is made on the basis of system costs and benefits, but also includes a comparison of technology status: power ratings and response time. A discussion of pollutant emissions and pollutant control strategies is included. The results show those electric utility applications for which each technology is best suited. (author)

  3. Onsite and Electric Backup Capabilities at Critical Infrastructure Facilities in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, Julia A. [Argonne National Lab. (ANL), Argonne, IL (United States); Wallace, Kelly E. [Argonne National Lab. (ANL), Argonne, IL (United States); Kudo, Terence Y. [Argonne National Lab. (ANL), Argonne, IL (United States); Eto, Joseph H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-04-01

    The following analysis, conducted by Argonne National Laboratory’s (Argonne’s) Risk and Infrastructure Science Center (RISC), details an analysis of electric power backup of national critical infrastructure as captured through the Department of Homeland Security’s (DHS’s) Enhanced Critical Infrastructure Program (ECIP) Initiative. Between January 1, 2011, and September 2014, 3,174 ECIP facility surveys have been conducted. This study focused first on backup capabilities by infrastructure type and then expanded to infrastructure type by census region.

  4. The impact of cost recovery on electric utilities' Clean Air Act compliance strategies

    International Nuclear Information System (INIS)

    Bensinger, D.L.

    1993-01-01

    By 1995, over 200 electric power plant units in twenty one states must comply with Phase I of the acid rain requirements in Title IV of the 1990 Clean Air Act Amendments (CAAA). By the year 2000, an additional 2200 units must comply with the Title IV. Compliance costs are expected to necessitate significant electricity rate increases. In order to recover their compliance costs, utilities must file rate increase requests with state public utility commissions (PUC's), and undergo a rate proceeding involving public heatings. Because of the magnitude of cost and the complexity of compliance options, including interaction with Titles I and III of the CAAA, extensive PUC reviews of compliance strategies are likely. These reviews could become as adversarial as the nuclear prudence reviews of the 1980's. A lack of understanding of air pollution and the CAA by much of the general public and the flexibility of compliance options creates an environment conducive to adverse public reaction to the cost of complying with the Clean Air Act. Public attitudes toward pollution control technologies will be greatly affected by these hearings, and the early plant hearings will shape the utility rate making process under the Clean Air Act. Inadequate cost recovery due to constrained compliance strategies or adverse hearings could significantly inhibit industry willingness to invest in certain control technologies or advanced combustion technologies. There are already signs that Clean Air Act compliance will be the prudence issue of the 1990's for utilities, even where state statutes mandate particular compliance approaches. Specific actions should be undertaken now by the utility industry to improve the probability of sound cost recovery decisions, preserve compliance options, including multimedia strategies, and avoid the social- and cost-acceptance problems of nuclear power

  5. Utilizing a vanadium redox flow battery to avoid wind power deviation penalties in an electricity market

    International Nuclear Information System (INIS)

    Turker, Burak; Arroyo Klein, Sebastian; Komsiyska, Lidiya; Trujillo, Juan José; Bremen, Lueder von; Kühn, Martin; Busse, Matthias

    2013-01-01

    Highlights: • Vanadium redox flow battery utilized for wind power grid integration was studied. • Technical and financial analyses at single wind farm level were performed. • 2 MW/6 MW h VRFB is suitable for mitigating power deviations for a 10 MW wind farm. • Economic incentives might be required in the short-term until the VRFB prices drop. - Abstract: Utilizing a vanadium redox flow battery (VRFB) for better market integration of wind power at a single wind farm level was evaluated. A model which combines a VRFB unit and a medium sized (10 MW) wind farm was developed and the battery was utilized to compensate for the deviations resulting from the forecast errors in an electricity market bidding structure. VRFB software model which was introduced in our previous paper was integrated with real wind power data, power forecasts and market data based on the Spanish electricity market. Economy of the system was evaluated by financial assessments which were done by considering the VRFB costs and the amount of deviation penalty payments resulting from forecast inaccuracies

  6. How satisfied are the major customers of electric utilities?; Wie zufrieden sind die grossen Stromkunden?

    Energy Technology Data Exchange (ETDEWEB)

    Edelmann, H. [VEW Energie AG, Dortmund (Germany). Abt. Marktforschung und Volkswirtschaft

    1998-07-27

    In the liberalised electric power market, satisfying customers is a very important objective of utilities, as customers are free to enter into supply contracts with competitors in the market. Satisfaction of customers enhances customer loyalty, as many electric utilities know by now, but only few utilities have a clear picture of the level of satisfaction of their customers, and of their standing in their customers` opinion in comparison with other marketers. The article explains approaches and methods for a systematic and well-founded survey of customers and assessment of customer satisfaction. (orig./CB) [Deutsch] In einem liberalisierten Elektrizitaetsmarkt kommt der Kundenzufriedenheit eine zentrale Bedeutung zu. Diese ist massgebend dafuer, ob ein Kunde zu einem anderen Anbieter wechselt oder nicht. Hohe Kundenzufriedenheit bedeutet hohe Kundenbindung. Viele Stromversorger haben das bereits erkannt, doch nur bei wenigen existiert ein klares Bild darueber, wie zufrieden ihre Kunden tatsaechlich mit ihnen sind und wie sie im Vergleich zu anderen Stromversorgern stehen. Wie dargestellt wird, laesst sich ein solches Bild nur ueber eine systematische und fundierte Messung der Kundenzufriedenheit gewinnen. (orig./RHM)

  7. Business case for implementing two ergonomic interventions at an electric power utility.

    Science.gov (United States)

    Seeley, Patricia A; Marklin, Richard W

    2003-09-01

    Ergonomics analysis of line workers in the electric power industry who work overhead on utility poles revealed some tasks for which less than 1% of the general population had sufficient strength to perform. During a 2-year study, a large Midwestern US electric utility provided a university with a team of represented workers and management. They evaluated, recommended, and monitored interventions for 32 common line worker tasks that were rated at medium to high magnitude of risk factors for musculoskeletal disorders (MSDs). Two of the recommended ergonomic interventions-the battery-operated press and cutter-were selected by the team as having the greatest potential for reducing risk factors of MSDs. Only overhead distribution line worker tasks were evaluated. A business case was formulated that took into account medical injury and illness statistics, workers' compensation, replacement worker and retraining costs. An outline of a business case formulation and a sample intervention payback calculation is shown. Based on the business case, the utility committed over US dollars 300000 to purchase battery-operated presses and cutters for their overhead distribution line crews.

  8. Data gathering in support of phase O program for waste heat utilization from nuclear enrichment facilities, Ohio

    International Nuclear Information System (INIS)

    1978-01-01

    The gathering of demographic, community development, and economic data for the region impacted by the Pikeville (Ohio) Nuclear Enrichment Facility is described. These data are to be used for establishing possible community uses, e.g., space heating, domestic water heating, and industrial uses, of waste heat from the facility. It was concluded that although the economic feasibility of such waste heat utilization remains to be proven, the community would cooperate in a feasibility demonstration program

  9. Estimated Value of Service Reliability for Electric Utility Customers in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, M.J.; Mercurio, Matthew; Schellenberg, Josh

    2009-06-01

    Information on the value of reliable electricity service can be used to assess the economic efficiency of investments in generation, transmission and distribution systems, to strategically target investments to customer segments that receive the most benefit from system improvements, and to numerically quantify the risk associated with different operating, planning and investment strategies. This paper summarizes research designed to provide estimates of the value of service reliability for electricity customers in the US. These estimates were obtained by analyzing the results from 28 customer value of service reliability studies conducted by 10 major US electric utilities over the 16 year period from 1989 to 2005. Because these studies used nearly identical interruption cost estimation or willingness-to-pay/accept methods it was possible to integrate their results into a single meta-database describing the value of electric service reliability observed in all of them. Once the datasets from the various studies were combined, a two-part regression model was used to estimate customer damage functions that can be generally applied to calculate customer interruption costs per event by season, time of day, day of week, and geographical regions within the US for industrial, commercial, and residential customers. Estimated interruption costs for different types of customers and of different duration are provided. Finally, additional research and development designed to expand the usefulness of this powerful database and analysis are suggested.

  10. Conference Proceedings: Effectively utilizing energy derivatives in a deregulated electricity market

    International Nuclear Information System (INIS)

    1998-01-01

    This conference was devoted to a discussion about the likely impacts of deregulation on electricity markets in North America. Many of the presentations emphasized price risk in a competitive open access energy market. It was noted that deregulation is frequently associated with the creation of larger companies, higher risks and lower costs. Some of the individual topics addressed by the speakers included discussion of : (1) how underlying physical markets will work in Ontario, (2) experiences in derivative trading in the natural gas industry, (3) how to create value through multiple commodity risk management products, (4) trading with energy derivatives in the U.S. (5) how derivatives can add value for municipal electrical utilities, and (6) risk management mechanisms for energy derivative trading. refs., tabs., figs

  11. The comparative costs of nuclear and fossil fuelled power plants in an American electricity utility

    International Nuclear Information System (INIS)

    Corey, G.R.

    1984-01-01

    This chapter compares the current and historic operating performances of twelve large nuclear and coal-fired units now operated by Commonwealth Edison Company, and provides specific comparison of bus-bar costs of electricity generated by those units in recent years. It also provides cost comparisons for future nuclear and coal-fired units and attempts to deal realistically with the effect of future inflation upon these comparisons. The chapter attempts to deal responsibly with the problem of uncertainty - how present-day comparisons may be affected by future developments and how my own published comparisons have varied over the past four or five years. The conclusion is reached that, given the uncertain world in which we live, no electric power supplier can afford to put all its eggs in one basket. Utility managers have a strong incentive to diversify their sources of power generation, and society as a whole would do well to encourage such diversification. (author)

  12. The Nuclear option for U.S. electrical generating capacity additions utilizing boiling water reactor technology

    International Nuclear Information System (INIS)

    Garrity, T.F.; Wilkins, D.R.

    1993-01-01

    The technology status of the Advanced Boiling Water (ABWR) and Simplified Boiling Water (SBWR) reactors are presented along with an analysis of the economic potential of advanced nuclear power generation systems based on BWR technology to meet the projected domestic electrical generating capacity need through 2005. The forecasted capacity needs are determined for each domestic North American Electric Reliability Council (NERC) region. Extensive data sets detailing each NERC region's specific generation and load characteristics, and capital and fuel cost parameters are utilized in the economic analysis of the optimal generation additions to meet this need by use of an expansion planning model. In addition to a reference case, several sensitivity cases are performed with regard to capital costs and fuel price escalation

  13. Research and development of power reactor technology supporting work, 3; Development of utility facility operation management technique

    Energy Technology Data Exchange (ETDEWEB)

    1990-03-01

    Demands on utility facilities for nuclear technology development are increasingly sophisticated and diversified. It is important to meet requirements of securing the reliability of utility supply and ensuring the safety of facility operation and maintenance by means of technical supporting, data supply and quick contingency responses. A New computer system to make practicable man-machine interface, real-time data acquisition and operation data centralization has been developed based on the knowledge. Obtained from data base information and operation experience for the purpose of operation efficiency and labor saving. (author).

  14. Utilization of Total Joint Arthroplasty in Physician-Owned Specialty Hospitals vs Acute Care Facilities.

    Science.gov (United States)

    Chen, Antonia F; Pflug, Emily; O'Brien, Daniel; Maltenfort, Mitchell G; Parvizi, Javad

    2017-07-01

    The recent emergence of physician-owned specialty hospitals has sparked controversy about overutilization. Thus, the purpose of this study was to compare utilization patterns of total joint arthroplasty (TJA) between physician-specialty hospitals (PSHs) and acute care hospitals (ACHs). A retrospective study was conducted from January 2010 to August 2014 comparing primary TJA patients between a PSH and an ACH; 103 PSH patients were matched to 103 ACH patients by age, gender, BMI, and ASA classification with similar case distribution between facilities. All surgeons in the study operated at both hospitals and were shareholders of the PSH. Information on nonoperative treatments, and timing to the initial appointment, consent, and surgery were analyzed using univariate analysis. Nonoperative treatments before surgery were similar between hospitals (P = 1.00). The time from the initial appointment to consent was longer for PSH (P = .0001). However, the time from consent to the date of surgery (P = .04) and the timing from symptoms to initial appointment (P = .006) was shorter for PSH. The time from initial appointment to the day of surgery was similar between groups (P = .20). Patients were more likely to be consented for surgery on their first clinic visit when undergoing surgery at ACH (87 of 103, 84.4%) compared to PSH (61 of 103; 59.2%; P total knee arthroplasty (P = .001) and total hip arthroplasty patients (P = .001) at PSH. Facility ownership in PSH resulted in similar conservative treatment before TJA. The time to surgical consent after the initial appointment was longer PSH, whereas the time from consent to the date of surgery was shorter at the PSH. Copyright © 2017 Elsevier Inc. All rights reserved.

  15. Possibilities and Barriers for Energy Conservation in a Liberalised Electricity Market: Danish Utility Experiences

    DEFF Research Database (Denmark)

    Meyer, Niels I

    1999-01-01

    Liberalisation of energy markets in Europe is in progress. The expressed goal is to promote efficiency through commercial competition, with lower energy prices for consumers as a consequence. This priority raises some complex questions in relation to the desire of creating a sustainable energy...... a sustainable energy development in efficiency and energy conservation. The electric utilities play an important role in this relation, but their priority is of commercial nature rather than concern for the environment. This dilemma is analyzed in more detail in the paper....

  16. Superconducting magnetic energy storage for electric utility load leveling: A study of cost vs. stored energy

    International Nuclear Information System (INIS)

    Luongo, C.A.; Loyd, R.J.

    1987-01-01

    Superconducting Magnetic Energy Storage (SMES) is a promising technology for electric utility load leveling. This paper presents the results of a study to establish the capital cost of SMES as a function of stored energy. Energy-related coil cost and total installed plant cost are given for construction in nominal soil and in competent rock. Economic comparisons are made between SMES and other storage technologies and peaking gas turbines. SMES is projected to be competitive at stored energies as low as 1000 MWh

  17. Design fractures and commercial potential of superconducting magnetic energy storage for electric utility application

    International Nuclear Information System (INIS)

    Lloyd, R.J.; Schoenung, S.

    1986-01-01

    Historically, energy storage in the United States has been provided by a few pumped hydroelectric plants, but siting constraints and high cost severely limit the use of this option. Two other options which will soon be in use are batteries and compressed air energy storage. A fourth option, currently being developed for load leveling is Superconducting Magnetic Energy Storage (SMES). This paper reports the design features and estimated costs of utility scale SMES plants. For moderate discharge duration, SMES is projected to have substantially lower revenue requirements and better availability than other load leveling options. The Electric Power Research Institute has prepared a plan for commercialization which could, if aggressively pursued, lead to a demonstrated SMES technology that is available for utility commitment by the late 1990's

  18. The effect of user fee exemption on the utilization of maternal health care at mission health facilities in Malawi.

    Science.gov (United States)

    Manthalu, Gerald; Yi, Deokhee; Farrar, Shelley; Nkhoma, Dominic

    2016-11-01

    The Government of Malawi has signed contracts called service level agreements (SLAs) with mission health facilities in order to exempt their catchment populations from paying user fees. Government in turn reimburses the facilities for the services that they provide. SLAs started in 2006 with 28 out of 165 mission health facilities and increased to 74 in 2015. Most SLAs cover only maternal, neonatal and in some cases child health services due to limited resources. This study evaluated the effect of user fee exemption on the utilization of maternal health services. The difference-in-differences approach was combined with propensity score matching to evaluate the causal effect of user fee exemption. The gradual uptake of the policy provided a natural experiment with treated and control health facilities. A second control group, patients seeking non-maternal health care at CHAM health facilities with SLAs, was used to check the robustness of the results obtained using the primary control group. Health facility level panel data for 142 mission health facilities from 2003 to 2010 were used. User fee exemption led to a 15% (P fee exemption is an important policy for increasing maternal health care utilization. For certain maternal services, however, other determinants may be more important. © The Author 2016. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine.

  19. Electric utility transmission and distribution upgrade deferral benefits from modular electricity storage : a study for the DOE Energy Storage Systems Program.

    Energy Technology Data Exchange (ETDEWEB)

    Eyer, James M. (Distributed Utility Associates, Inc., Livermore, CA)

    2009-06-01

    The work documented in this report was undertaken as part of an ongoing investigation of innovative and potentially attractive value propositions for electricity storage by the United States Department of Energy (DOE) and Sandia National Laboratories (SNL) Electricity Storage Systems (ESS) Program. This study characterizes one especially attractive value proposition for modular electricity storage (MES): electric utility transmission and distribution (T&D) upgrade deferral. The T&D deferral benefit is characterized in detail. Also presented is a generalized framework for estimating the benefit. Other important and complementary (to T&D deferral) elements of possible value propositions involving MES are also characterized.

  20. The Effects of Rising Interest Rates on Electric Utility Stock Prices: Regulatory Considerations and Approaches

    Energy Technology Data Exchange (ETDEWEB)

    Kihm, Steve [Seventhwave, Madison, WI (United States); Satchwell, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Cappers, Peter [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-07-26

    This technical brief identifies conditions under which utility regulators should consider implementing policy approaches that seek to mitigate negative outcomes due to an increase in interest rates. Interest rates are a key factor in determining a utility’s cost of equity and investors find value when returns exceed the cost of equity. Through historical observations of periods of rising and falling interest rates and application of a pro forma financial tool, we identify the key drivers of utility stock valuations and estimate the degree to which those valuations might be affected by increasing interest rates.3 We also analyze the efficacy of responses by utility regulators to mitigate potential negative financial impacts. We find that regulators have several possible approaches to mitigate a decline in value in an environment of increasing interest rates, though regulators must weigh the tradeoffs of improving investor value with potential increases in customer costs. Furthermore, the range of approaches reflects today’s many different electric utility regulatory models and regulatory responses to a decline in investor value will fit within state-specific models.

  1. Seismic risk analysis for General Electric Plutonium Facility, Pleasanton, California. Final report, part II

    International Nuclear Information System (INIS)

    1980-01-01

    This report is the second of a two part study addressing the seismic risk or hazard of the special nuclear materials (SNM) facility of the General Electric Vallecitos Nuclear Center at Pleasanton, California. The Part I companion to this report, dated July 31, 1978, presented the seismic hazard at the site that resulted from exposure to earthquakes on the Calaveras, Hayward, San Andreas and, additionally, from smaller unassociated earthquakes that could not be attributed to these specific faults. However, while this study was in progress, certain additional geologic information became available that could be interpreted in terms of the existance of a nearby fault. Although substantial geologic investigations were subsequently deployed, the existance of this postulated fault, called the Verona Fault, remained very controversial. The purpose of the Part II study was to assume the existance of such a capable fault and, under this assumption, to examine the loads that the fault could impose on the SNM facility. This report first reviews the geologic setting with a focus on specifying sufficient geologic parameters to characterize the postulated fault. The report next presents the methodology used to calculate the vibratory ground motion hazard. Because of the complexity of the fault geometry, a slightly different methodology is used here compared to the Part I report. This section ends with the results of the calculation applied to the SNM facility. Finally, the report presents the methodology and results of the rupture hazard calculation

  2. Impact of state Medicaid coverage on utilization of inpatient rehabilitation facilities among patients with stroke.

    Science.gov (United States)

    Skolarus, Lesli E; Burke, James F; Morgenstern, Lewis B; Meurer, William J; Adelman, Eric E; Kerber, Kevin A; Callaghan, Brian C; Lisabeth, Lynda D

    2014-08-01

    Poststroke rehabilitation is associated with improved outcomes. Medicaid coverage of inpatient rehabilitation facility (IRF) admissions varies by state. We explored the role of state Medicaid IRF coverage on IRF utilization among patients with stroke. Working age ischemic stroke patients with Medicaid were identified from the 2010 Nationwide Inpatient Sample. Medicaid coverage of IRFs (yes versus no) was ascertained. Primary outcome was discharge to IRF (versus other discharge destinations). We fit a logistic regression model that included patient demographics, Medicaid coverage, comorbidities, length of stay, tissue-type plasminogen activator use, state Medicaid IRF coverage, and the interaction between patient Medicaid status and state Medicaid IRF coverage while accounting for hospital clustering. Medicaid did not cover IRFs in 4 (TN, TX, SC, WV) of 42 states. The impact of State Medicaid IRF coverage was limited to Medicaid stroke patients (P for interaction stroke patients in states with Medicaid IRF coverage, Medicaid stroke patients hospitalized in states without Medicaid IRF coverage were less likely to be discharged to an IRF of 11.6% (95% confidence interval, 8.5%-14.7%) versus 19.5% (95% confidence interval, 18.3%-20.8%), Pstroke patients with Medicaid. Given the increasing stroke incidence among the working age and Medicaid expansion under the Affordable Care Act, careful attention to state Medicaid policy for poststroke rehabilitation and analysis of its effects on stroke outcome disparities are warranted. © 2014 American Heart Association, Inc.

  3. Utilization of AHWR critical facility for research and development work on large sample NAA

    International Nuclear Information System (INIS)

    Acharya, R.; Dasari, K.B.; Pujari, P.K.; Swain, K.K.; Reddy, A.V.R.; Verma, S.K.; De, S.K.

    2014-01-01

    The graphite reflector position of AHWR critical facility (CF) was utilized for analysis of large size (g-kg scale) samples using internal mono standard neutron activation analysis (IM-NAA). The reactor position was characterized by cadmium ratio method using In monitor for total flux and sub cadmium to epithermal flux ratio (f). Large sample neutron activation analysis (LSNAA) work was carried out for samples of stainless steel, ancient and new clay potteries and dross. Large as well as non-standard geometry samples (1 g - 0.5 kg) were irradiated. Radioactive assay was carried out using high resolution gamma ray spectrometry. Concentration ratios obtained by IM-NAA were used for provenance study of 30 clay potteries, obtained from excavated Buddhist sites of AP, India. Concentrations of Au and Ag were determined in not so homogeneous three large size samples of dross. An X-Z rotary scanning unit has been installed for counting large and not so homogeneous samples. (author)

  4. Investigation on integrity of JMTR concrete structures, cooling system and utility facilities

    International Nuclear Information System (INIS)

    Ebisawa, Hiroyuki; Tobita, Kenji; Fukasaku, Akitomi; Kaminaga, Masanori

    2010-02-01

    The condition of facilities and components to be used for re-operation of the Japan Materials Testing Reactor (JMTR) from FY2011, was investigated before the refurbishment work. An investigation of aged components (aged-investigation) was carried out for concrete structures of the JMTR reactor building, exhaust stack, trench, canal, filter banks and for aged components of tanks in the primary cooling system, heat exchangers, pipes in the secondary cooling system, cooling tower, emergency generators and so on, in order to identify their integrity. The aged-investigation was carried out from the beginning of FY2007. As a result, cracks of concrete structures such as the exhaust stack, a foundation of the UCL (Utility Cooling Line) elevated water tank were repaired and pipe linings of secondary cooling system were replaced. Motors of primary cooling pumps, pumps in the secondary cooling system and in other systems were decided to replace from viewpoints of future maintenance and improvement of reliability. Other components and the reactor building were decided to use continuously for a long-term by appropriate maintenance activities based on the long-term maintenance plan. In this paper, the aged-investigation for the JMTR reactor building, heat exchangers and emergency generators is presented. (author)

  5. 77 FR 28872 - Notice of FERC Staff Attendance at the SPP-ITO Louisville Gas & Electric/Kentucky Utilities...

    Science.gov (United States)

    2012-05-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the SPP-ITO Louisville Gas & Electric/Kentucky Utilities Stakeholder Meeting The Federal Energy Regulatory... is part of the Commission's ongoing outreach efforts. SPP-ITO Louisville Gas & Electric/Kentucky...

  6. Mortality of persons resident in the vicinity of electricity transmission facilities

    Energy Technology Data Exchange (ETDEWEB)

    McDowall, M E

    1986-02-01

    Several studies have raised the possibility that exposure to electrical and/or magnetic fields may be injurious to health in particular by the promotion or initiation of cancer. To investigate whether the electricity transmission system presents a long term hazard to public health, the mortality of nearly 8,000 persons, identified as living in the vicinity of electrical transmission facilities at the time of the 1971 Population Census, has been followed to the end of 1983. All identified transmission installations within pre-defined areas were included in the study with the result that the greater part of the study group were believed to be resident near relatively low voltage sub-stations. Overall mortality was lower than expected and no evidence of major health hazards emerged. The only statistically significant excess mortality was for lung cancer (in women overall, and in persons living closest to the installations); this result is difficult to interpret in the absence of smoking data, and is not supported by other evidence but does not appear to be due to the social class distribution of the study group. The study did not support previously reported associations of exposure to electro-magnetic fields with acute myeloid leukaemia, other lymphatic cancers and suicide.

  7. Reconfiguration of NASA GRC's Vacuum Facility 6 for Testing of Advanced Electric Propulsion System (AEPS) Hardware

    Science.gov (United States)

    Peterson, Peter Y.; Kamhawi, Hani; Huang, Wensheng; Yim, John T.; Haag, Thomas W.; Mackey, Jonathan A.; McVetta, Michael S.; Sorrelle, Luke T.; Tomsik, Thomas M.; Gilligan, Ryan P.; hide

    2018-01-01

    The NASA Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5 kW Hall thruster has been the subject of extensive technology maturation in preparation for development into a flight propulsion system. The HERMeS thruster is being developed and tested at NASA GRC and NASA JPL through support of the Space Technology Mission Directorate (STMD) and is intended to be used as the electric propulsion system on the Power and Propulsion Element (PPE) of the recently announced Deep Space Gateway (DSG). The Advanced Electric Propulsion System (AEPS) contract was awarded to Aerojet-Rocketdyne to develop the HERMeS system into a flight system for use by NASA. To address the hardware test needs of the AEPS project, NASA GRC launched an effort to reconfigure Vacuum Facility 6 (VF-6) for high-power electric propulsion testing including upgrades and reconfigurations necessary to conduct performance, plasma plume, and system level integration testing. Results of the verification and validation testing with HERMeS Technology Demonstration Unit (TDU)-1 and TDU-3 Hall thrusters are also included.

  8. Degradation diagnosing method for low voltage electric wire and cable in nuclear facility

    International Nuclear Information System (INIS)

    Kamimura, Seiji; Seki, Ikuo; Yagyu, Hideki; Onishi, Takao; Kusama, Yasuo.

    1991-01-01

    A considerable skill is required for a visual inspection method which has been used most widely for determining the degradation of low voltage electric wires and cables used mostly in facilities such as nuclear power plants. It is extremely difficult to determine the degradation accurately and appropriately even for skilled inspectors because of individual difference. Then, a small amount of organic insulation materials is taken as a sample from insulators or sheath materials actually disposed. The pyrolytic temperature of the sample is measured by thermal gravimetric analysis to determine the extent of the degradation of the electric wire and cable based on the relationship between the degradation and the elongation. Since there is a close relationship between the temperature at which the measured weight of the sample is reduced by 5% and the degradation behavior of the mechanical property, analysis can be conducted effectively by an extremely small amount of the sample. Since the insulation degradation of relatively low voltage electric wires and cables can be determined in a non-destructive manner at high accuracy, the lifetime can be forecasted. (N.H.)

  9. Comfort and performance of power line maintainers' gloves during electrical utility work in the cold.

    Science.gov (United States)

    Hunt, S; Boyle, C; Wells, R

    2014-01-01

    Electrical utility workers wear thick rubber gloves and often work in the cold. To document the challenge of working in the cold and the effectiveness of different glove/liner combinations in keeping workers' hands warm. Ten experienced male electrical utility employees worked in a controlled temperature walk-in chamber at -20 °C for 45 minutes for each of five glove conditions: standard five-finger rubber gloves with cotton liners and gauntlets, mitten style gloves, a prototype wool liner, and two heating options; glove or torso. Dependent measures were maximum grip force, skin temperatures, finger dexterity and sensitivity to touch, ratings of perceived effort and a rating of thermal sensation. Participants' hand skin temperatures decreased, they perceived their hands to be much colder, their finger sensitivity decreased and their ratings of perceived exertion increased, however their performance did not degrade over the 45 minute trials. The mitten-style gloves showed a smaller drop in skin temperature for the 3rd and 5th digits (pglove conditions. Mitten style gloves kept workers' hands warmer than the standard five finger glove.

  10. Report on the achievements in fiscal 1999 of research and development of a femto-second technology. Research and developing of a electric power generation facility monitoring system utilizing high-luminance X-ray pulses; 1999 nendo femto byo technology no kenkyu kaihatsu seika hokokusho. Kokido X sen riyo hatsuden shisetsu monitoring system no kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Researches have been made with an objective to generate femto-second high-luminance X-ray pulses by using interactions between femto-second light pulses and high-density electron ray pulses, and to develop a technology to use the above pulses to measure objects moving at high speeds. This paper reports the achievements in fiscal 1999. In research and development of the ultra short light/electron ray pulse generating and controlling technology, totally solid laser was used as an excitation source for a mode synchronous laser transmitter. A high-accuracy moving stage driven by piezo elements and motor was used to actively control the resonator length by using the RF reference signals, wherein time fluctuation was reduced down to 100 fs level. Design and fabrication were performed on an electron ray accelerator and an electron ray transporter of the electron ray source system for Compton X-ray. Electron energy of 12 MeV and electric charge of 1 nC were achieved in an electron beam acceleration test. In the research and development of a femto-second high-luminance X-ray pulse generating technology, design and fabrication were carried out on a Compton collision chamber that can generate X-ray pulses with high luminance. (NEDO)

  11. Case Studies of Potential Facility-Scale and Utility-Scale Non-Hydro Renewable Energy Projects across Reclamation

    Energy Technology Data Exchange (ETDEWEB)

    Haase, S.; Burman, K.; Dahle, D.; Heimiller, D.; Jimenez, A.; Melius, J.; Stoltenberg, B.; VanGeet, O.

    2013-05-01

    This report summarizes the results of an assessment and analysis of renewable energy opportunities conducted for the U.S. Department of the Interior, Bureau of Reclamation by the National Renewable Energy Laboratory. Tasks included assessing the suitability for wind and solar on both a utility and facility scale.

  12. Evaluating Potential Human Health Risks Associated with the Development of Utility-Scale Solar Energy Facilities on Contaminated Sites

    Energy Technology Data Exchange (ETDEWEB)

    Cheng, J. -J. [Argonne National Lab. (ANL), Argonne, IL (United States); Chang, Y. -S. [Argonne National Lab. (ANL), Argonne, IL (United States); Hartmann, H. [Argonne National Lab. (ANL), Argonne, IL (United States); Wescott, K. [Argonne National Lab. (ANL), Argonne, IL (United States); Kygeris, C. [Indiana Univ. of Pennsylvania, PA (United States)

    2013-09-01

    This report presents a general methodology for obtaining preliminary estimates of the potential human health risks associated with developing a utility-scale solar energy facility on a contaminated site, based on potential exposures to contaminants in soils (including transport of those contaminants into the air).

  13. Facilities Inventory and Utilization Study Fall of 1988 for the State of North Carolina. Twenty-Second Edition.

    Science.gov (United States)

    North Carolina State Commission on Higher Education Facilities, Raleigh.

    This edition of an annual series of facilities inventory and utilization studies reflects the status of space in North Carolina institutions of higher education at the end of the drop-add period of the 1988 fall term at each college. It gives indications of the uses being made of the space and provides norms and historical information for the past…

  14. DIAMOND: A model of incremental decision making for resource acquisition by electric utilities

    Energy Technology Data Exchange (ETDEWEB)

    Gettings, M.; Hirst, E.; Yourstone, E.

    1991-02-01

    Uncertainty is a major issue facing electric utilities in planning and decision making. Substantial uncertainties exist concerning future load growth; the lifetimes and performances of existing power plants; the construction times, costs, and performances of new resources being brought online; and the regulatory and economic environment in which utilities operate. This report describes a utility planning model that focuses on frequent and incremental decisions. The key features of this model are its explicit treatment of uncertainty, frequent user interaction with the model, and the ability to change prior decisions. The primary strength of this model is its representation of the planning and decision-making environment that utility planners and executives face. Users interact with the model after every year or two of simulation, which provides an opportunity to modify past decisions as well as to make new decisions. For example, construction of a power plant can be started one year, and if circumstances change, the plant can be accelerated, mothballed, canceled, or continued as originally planned. Similarly, the marketing and financial incentives for demand-side management programs can be changed from year to year, reflecting the short lead time and small unit size of these resources. This frequent user interaction with the model, an operational game, should build greater understanding and insights among utility planners about the risks associated with different types of resources. The model is called DIAMOND, Decision Impact Assessment Model. In consists of four submodels: FUTURES, FORECAST, SIMULATION, and DECISION. It runs on any IBM-compatible PC and requires no special software or hardware. 19 refs., 13 figs., 15 tabs.

  15. Operating and impact of the compensation mechanism of the electric utility charges on the energy offer in non connected areas

    International Nuclear Information System (INIS)

    Levratto, N.

    2005-01-01

    Since the law of the 10 february 2000 relative to the modernization and the development of the electric utility, the France adopted a mechanism aiming to compensate the costs subjected by EDF and other suppliers providing a public utility mission in the domain of the electricity production and distribution. This document takes stock on the organization, the evaluation and the economical and environmental consequences of the implementing of a compensation system of costs bond to the electricity production in non connected areas. (A.L.B.)

  16. Impact of Neuromuscular Electrical Stimulation (NMES) on 90-Day Episode Costs and Post-Acute Care Utilization in Total Knee Replacement Patients with Disuse Atrophy.

    Science.gov (United States)

    Pal, Sarmistha; Chughtai, Morad; Sultan, Assem A; Khlopas, Anton; Sodhi, Nipun; George, Nicole E; Etcheson, Jennifer I; Gwam, Chukwuweike U; Newman, Jared M; Samuel, Linsen T; Bhave, Anil; DaVanzo, Joan E; Mont, Michael A

    2017-12-22

    This study evaluated differences in: 1) total episode payments, 2) probability of hospital readmission, 3) probability of inpatient rehab facility (IRF) and utilization, and 4) probability of skilled nursing care facility (SNF) utilization in patients who had disuse atrophy and underwent a total knee arthroplasty (TKA) and either did, or did not, receive preoperative home-based neuromuscular electrical stimulation (NMES) therapy. We used the Medicare limited dataset for a 5% sample of beneficiaries from 2014 and 2015 to construct episodes-of-care for TKA (DRG-470) patients with disuse atrophy who underwent a TKA during the 30 days prior to hospital admission and 90 days post-discharge. Patients were stratified into those who either did or did not receive pre- and postoperative NMES therapy. An ordinary least square (OLS) model was used to estimate the impact of NMES on total episode. Linear probability models were used to estimate the impact of NMES on SNF or IRF utilization and readmission. A $3,274 reduction in episode payments for patients who used preoperative NMES versus those who did not (ptotal episode payments and SNF utilization for TKA patients with disuse atrophy who had NMES therapy was demonstrated.

  17. Cost of energy from utility-owned solar electric systems. A required revenue method for ERDA/EPRI evaluations

    Energy Technology Data Exchange (ETDEWEB)

    1976-06-01

    This methodology calculates the electric energy busbar cost from a utility-owned solar electric system. This approach is applicable to both publicly- and privately-owned utilities. Busbar cost represents the minimum price per unit of energy consistent with producing system-resultant revenues equal to the sum of system-resultant costs. This equality is expressed in present value terms, where the discount rate used reflects the rate of return required on invested capital. Major input variables describe the output capabilities and capital cost of the energy system, the cash flows required for system operation and maintenance, and the financial structure and tax environment of the utility.

  18. Study of electrical power facilities and measures for planned outages in Japanese hemodialysis clinics after the Great East Japan Earthquake.

    Science.gov (United States)

    Ishida, Kai; Sawa, Manami; Fujiwara, Kousaku; Hirose, Minoru; Tsuruta, Harukazu; Takeuchi, Akihiro; Ikeda, Noriaki

    2013-02-01

    The Great East Japan Earthquake on 11 March 2011 caused major damage in northeastern Japan. The Kanto region experienced a massive electrical power shortage in the summer of 2011. A questionnaire was submitted to 354 hemodialysis clinics in Kanagawa prefecture and the Tokyo metropolitan area, excluding isolated islands, and 176 responses were analyzed (49.7%). The questions included evaluation of the availability of a private electricity generator, countermeasures in case of a planned outage, awareness of saving electricity, and improvement of safety of medical devices or electrical facilities after the earthquake. Only 12% of the clinics had private electricity generators and many clinics had no plans to introduce this facility. However, 96% of the clinics had established countermeasures to deal with a planned outage. Many clinics planned to provide dialysis on a different day or at a different time. All clinics had tried hard to establish procedures to save electricity in the summer of 2011, and 84% of the clinics had reconsidered and improved the safety of medical devices or electricity facilities after the earthquake. These results show that the awareness of crisis management was greatly improved in the wake of the earthquake. © 2012 The Authors. Therapeutic Apheresis and Dialysis © 2012 International Society for Apheresis.

  19. Effects of magnetic geometry, fluctuations, and electric fields on confinement in the Advanced Toroidal Facility

    International Nuclear Information System (INIS)

    Isler, R.C.; Aceto, S.; Baylor, L.R.; Bigelow, T.S.; Bell, G.L.; Bell, J.D.; Carreras, B.A.; Colchin, R.J.; Crume, E.C.; Dominguez, N.; Dory, R.A.; Dunlap, J.L.; Dyer, G.R.; England, A.C.; Gandy, R.F.; Glowienka, J.C.; Hanson, G.R.; Harris, J.H.; Hiroe, S.; Horton, L.D.; Jernigan, T.C.; Ji, H.; Langley, R.A.; Lee, D.K.; Likin, K.M.; Lyon, J.F.; Ma, C.H.; Morimoto, S.; Murakami, M.; Okada, H.; Qualls, A.L.; Rasmussen, D.A.; Rome, J.A.; Sato, M.; Schwelberger, J.G.; Shats, M.G.; Simpkins, J.E.; Thomas, C.E.; Uckan, T.; Wade, M.R.; Wilgen, J.B.; Wing, W.R.; Yamada, H.; Zielinski, J.J.

    1992-01-01

    Recent experiments in the Advanced Toroidal Facility (ATF) [Fusion Technol. 10, 179 (1986)] have been directed toward investigations of the basic physics mechanisms that control confinement in this device. Measurements of the density fluctuations throughout the plasma volume have provided indications for the existence of theoretically predicted dissipative trapped electron and resistive interchange instabilities. These identifications are supported by results of dynamic configuration scans of the magnetic fields during which the magnetic well volume, shear, and fraction of confined trapped particles are changed continuously. The influence of magnetic islands on the global confinement has been studied by deliberately applying error fields which strongly perturb the nested flux-surface geometry, and the effects of electric fields have been investigated by means of biased limiter experiments

  20. Affairs of power: Restructuring California's electric utility industry, 1968-1998

    Science.gov (United States)

    Myers, William Allan

    This dissertation studies the process of change in the political economy of electric utilities. Following two decades of continual growth during the nation's post-World War Two economic and population boom, the electric power industry confronted increasing challenges to its traditional operating practices and cultural values, nowhere with greater intensity than in California. Pressure for change came from outside forces who opposed utilities' business practices, assailed their traditional vertically-integrated structure, questioned the political assumptions that sustained their monopoly status, and ultimately wrested away access to the once tightly controlled technology of electric generation and transmission. Because managers of both investor-owned and publicly-owned utilities continued to rely upon long-standing economic and technical assumptions derived from deeply held cultural values sustained by decades of business success, they were rendered unable to comprehend and unwilling to accommodate change. Persistent mistrust between the publicly-owned and privately-owned sectors further weakened the industry's ability to work cooperatively in the face of crucial challenges. Thus encumbered by endemic structural jealousy, technological path dependency, and organizational stasis, the industry did not respond with sufficient innovation to new social values and altering economic conditions, ultimately resulting in the discarding of the old political economy of regulated monopolism. Five precepts of economic history are identified as crucial elements of the process of change. First, the tension between protection and entry, and the related issue of access to technology, contributes to creation and modification of the political economy in which economic institutions function. Second, submission to governmental regulatory powers allows certain industries to control entry, restrict access, and protect themselves from the dynamics of competitive change. Third, an

  1. Design of helium-gas supplying facility of out-of-pile demonstration test for HTTR heat utilization system

    Energy Technology Data Exchange (ETDEWEB)

    Hino, Ryutaro; Fujisaki, Katsuo; Kobayashi, Toshiaki [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment] [and others

    1996-09-01

    One of the objectives of the High-Temperature Engineering Test Reactor (HTTR) is to demonstrate effectiveness of high-temperature heat utilization. Prior to connect a heat utilization system to the HTTR, a series of out-of-pile demonstration test is indispensable to improve components` performance, to demonstrate operation, control and safety technologies and to verify analysis codes for design and safety evaluation. After critical review and discussion on the out-of-pile demonstration test, a test facility have been designed. In this report, a helium-gas supplying facility simulated the HTTR system was described in detail, which supplies High-temperature helium-gas of 900degC to a steam reforming facility mocking-up the HTTR heat utilization system. Components of the Helium Engineering Demonstration Loop (HENDEL) were selected to reuse in the helium-gas supplying facility in order to decrease construction cost. Structures and specifications of new components such as a high-temperature heater and a preheater were decided after evaluation of thermal and hydraulic performance and strength. (author)

  2. A Methodology for Conducting Space Utilization Studies within Department of Defense Medical Facilities

    Science.gov (United States)

    1992-07-01

    database programs, such as dBase or Microsoft Excell, to yield statistical reports that can profile the health care facility . Ladeen (1989) feels that the...service specific space status report would be beneficial to the specific service(s) under study, it would not provide sufficient data for facility -wide...change in the Master Space Plan. The revised methodology also provides a mechanism and forum for spuce management education within the facility . The

  3. Social capital, outpatient care utilization and choice between different levels of health facilities in rural and urban areas of Bhutan.

    Science.gov (United States)

    Herberholz, Chantal; Phuntsho, Sonam

    2018-06-18

    This study examines the factors that explain outpatient care utilization and the choice between different levels of health facilities in Bhutan, focusing on individual social capital, given Bhutan's geography of remote and sparsely populated areas. The more isolated the living, the more important individual social capital may become. Standard factors proposed by the Andersen model of healthcare utilization serve as control variables. Data for 2526 households from the 2012 Bhutan Living Standards Survey, which contains a social capital module covering structural, cognitive and output dimensions of social capital, are used. The results from the logistic regression analysis show that individual social capital is positively related with the probability of seeking treatment when ill or injured. Informal social contacts and perceived help and support are most important in rural areas, whereas specific trust matters in urban areas. The explanatory power of the model using a subset of the data for urban areas only, however, is very low as most predisposing and enabling factors are insignificant, which is not surprising though in view of better access to health facilities in urban areas and the fact that healthcare is provided free of charge in Bhutan. Multinomial regression results further show that structural and output dimensions of social capital influence the likelihood of seeking care at secondary or tertiary care facilities relative to primary care facilities. Moreover, economic status and place of residence are significantly associated with healthcare utilization and choice of health facility. The findings with respect to social capital suggest that strategizing and organizing social capital may help improve healthcare utilization in Bhutan. Copyright © 2018 Elsevier Ltd. All rights reserved.

  4. Nuclear power and the market value of the shares of electric utilities

    Science.gov (United States)

    Lyons, Joseph T.

    The most basic principle of security valuation is that market prices are determined by investors' expectations of the firm's performance in the future. These expectations are generally understood to be related to the risk that investors will bear by holding the firm's equity. There is considerable evidence that financial statements prepared in accordance with accrual-based accounting standards consistent with Generally Accepted Accounting Principles (GAAP) have information content relevant to the establishment of market prices. In 2001, the Financial Accounting Standards Board (FASB) issued Statement of Financial Accounting Standard No. 143, "Accounting for Asset Retirement Obligations," changing the accounting standards that must be used to prepare financial statements. This paper investigates the effect that investment in nuclear power has on the market value of electric utilities and the impact on the securities markets of the significant changes in financial statement presentation mandated by this new standard.

  5. Preliminary design of steam reformer in out-pile demonstration test facility for HTTR heat utilization system

    Energy Technology Data Exchange (ETDEWEB)

    Haga, Katsuhiro; Hino, Ryutaro; Inagaki, Yosiyuki; Hata, Kazuhiko; Aita, Hideki; Sekita, Kenji; Nishihara, Tetsuo; Sudo, Yukio [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment; Yamada, Seiya

    1996-11-01

    One of the key objectives of HTTR is to demonstrate effectiveness of high-temperature nuclear heat utilization system. Prior to connecting a heat utilization system to HTTR, an out-pile demonstration test is indispensable for the development of experimental apparatuses, operational control and safety technology, and verification of the analysis code of safety assessment. For the first heat utilization system of HTTR, design of the hydrogen production system by steam reforming is going on. We have proposed the out-pile demonstration test plan of the heat utilization system and conducted preliminary design of the test facility. In this report, design of the steam reformer, which is the principal component of the test facility, is described. In the course of the design, two types of reformers are considered. The one reformer contains three reactor tubes and the other contains one reactor tube to reduce the construction cost of the test facility. We have selected the steam reformer operational conditions and structural specifications by analyzing the steam reforming characteristics and component structural strength for each type of reformer. (author)

  6. Thermal and electrical joint test for the helical field coils in the Advanced Toroidal Facility

    International Nuclear Information System (INIS)

    Brown, R.L.; Johnson, R.L.

    1985-01-01

    Initial feasibility studies of a number of configurations for the Advanced Toroidal Facility (ATF) resulted in the selection of a resistive copper continuous-coil torsatron as the optimum device considering the physics program, cost, and schedule. Further conceptual design work was directed toward optimization of this configuration and, if possible, a shorter schedule. It soon became obvious that in order to shorten the schedule, a number of design and fabrication activities should proceed in parallel. This was most critical for the vacuum vessel and the helical field (HF) coils. If the HF coils were wound in place on a completed vacuum vessel, the overall schedule would be significantly (greater than or equal to12 months) longer. The approach of parallel scheduel paths requires that the HF coils be segmented into parts of less than or equal to180 0 of poloidal angle and that joints be made on a turn-by-turn basis when the segments are installed. It was obvious from the outset that the compact and complex geometry of the joint design presented a special challenge in the areas of reliability, assembly, maintenance, disassembly, and cost. Also, electrical, thermal, and force excursions are significant for these joints. A number of soldered, welded, brazed, electroplated, and bolted joints were evaluated. The evaluations examined fabrication feasibility and complexity, thermal-electrical performance at approximately two-thirds of the steady-state design conditions, and installation and assembly processes. Results of the thermal-electrical tests were analyzed and extrapolated to predict performance at peak design parameters. The final selection was a lap-type joint clamped with insulated bolts that pass through the winding packing. 3 refs., 4 figs

  7. Facile synthesis and electrical switching properties of V{sub 2}O{sub 3} powders

    Energy Technology Data Exchange (ETDEWEB)

    Ji, Haining; Liu, Dongqing, E-mail: dongqingliu@ymail.com; Cheng, Haifeng; Yang, Lixiang; Zhang, Chaoyang; Zheng, Wenwei

    2017-03-15

    Highlights: • Single crystal uniform V{sub 2}O{sub 3} powders have been synthesized without additional surfactant. • Powders were obtained in only 6 h. • Powders exhibit reversible phase transition properties. • Powders have excellent electrical switching properties with resistance changes as large as 10{sup 4}. - Abstract: V{sub 2}O{sub 3} powders were synthesized with mercaptoacetic acid (C{sub 2}H{sub 4}O{sub 2}S) as reducing agent and stabilizer via a facile hydrothermal approach. The crystalline structure, surface morphology, valence state of the derived V{sub 2}O{sub 3} powders were characterized via X-ray diffraction, scanning electron microscopy, transmission electron microscopy, X-ray photoelectron spectroscopy. It was found that the ratio and reaction time played a duel role in the formation and morphology of the V{sub 2}O{sub 3} powders. The metal-insulator transition properties of V{sub 2}O{sub 3} powders were studied by the differential scanning calorimetry curve and variable temperature Raman spectra. The change in electrical resistance due to the metal-insulator transition was measured from 80 to 240 K using physical property measurement system. The results showed V{sub 2}O{sub 3} samples had excellent electrical switching properties with resistance changes as large as 10{sup 4}. This simple and fast synthesis approach makes the V{sub 2}O{sub 3} powders easily accessible for exploring their fundamental properties and potential applications in novel electronic devices.

  8. Labor supply of engineers and scientists for nuclear electric utilities, 1987-1992

    International Nuclear Information System (INIS)

    Blair, L.M.

    1988-01-01

    An assessment of the adequacy of the supply of health physicists, nuclear engineers, and other engineers for the nuclear electric utility industry is based on job openings for scientists and engineers in broader nuclear-power-related fields, which include engineering and design, manufacturing, fabrication, supporting services, and government. In assessing the likely adequacy of labor supplies for commercial nuclear power job openings over the next 5 yr, consideration has been given to competing sources of labor demands, including nuclear energy research and development activities, nuclear defense, and the total US economy, and to the likely supply of new graduates. In particular, over the last 3 yr, the number of degrees awarded and enrollments in nuclear engineering programs have declined 12 and 14%, respectively, and in health physics programs, 5 and 14%, respectively. For health physics and nuclear engineers, tight labor market conditions (i.e. labor supplies and demand balanced at relatively high salaries) are expected over the next 5 yr because of declining enrollments and slowly growing employment levels plus job replacement needs. The commercial nuclear power field is expected to face tight labor markets for electrical and materials engineers because of strong competing demands in the economy. Other engineering occupations are likely to have adequate supplies for the nuclear power field but at salaries that continue to be relatively higher than salaries for other professional occupations

  9. Issues for the electric utilities posed by DT tokamak fusion powerplants

    International Nuclear Information System (INIS)

    Roth, J.R.

    1990-01-01

    The DT tokamak is the mainline approach to magnetic fusion energy in all industrialized countries with a major commitment to fusion research. It achieved this status largely through historical accident and not as the result of considered choice among alternatives. After twenty-five years of intensive tokamak research, it is appropriate to ask whether the path down which the tokamak concept is leading the fusion community is the way to an acceptable powerplant for the electric utilities, or an aberration which should be replaced with an approach more promising in the long term. Issues surrounding the DT tokamak can be grouped in three broad areas: physics; safety/environmental; and engineering/economic. In addition to these problems, detailed engineering design studies of DT tokamak fusion powerplants over a twenty year period have revealed a number of additional problems. Most of thee are related to the presence of tritium and energetic neutron fluxes, which tend to make the cost of electricity of DT tokamaks higher than that of fossil or fission powerplants. These safety and economic issues of the DT tokamak powerplant also appear to be intractable, and have not been made to go away by twenty years of progressively more detailed and extensive engineering design studies

  10. Cost functions and the electric utility industry. A contribution to the debate on deregulation

    International Nuclear Information System (INIS)

    Ramos-Real, F.J.

    2005-01-01

    This study analyses the main articles that estimate cost functions in the electricity utility industry with a view to studying of the initial arguments for proposing competition and vertical disintegration. The works reviewed here, in general terms, confirm the initial arguments in favour of the deregulation process, mainly, the exhaustion of scale economies for moderate size firms in generation and the condition of natural monopoly for transmission and distribution. However, the savings obtained from undertaking different activities together should be kept in mind when restructuring the sector. On the other hand, the improvements in productivity deriving from the reforms have not translated into reductions in the price of electricity in many countries. These last two results suggest the need for appropriate market regulation for the deregulation process to translate into an improvement in how the sector works and into benefits for consumers. There is still insufficient empirical literature on these issues due to the fact that the process is still ongoing in many countries and more time will have to transpire before sufficient data is available

  11. The liberalization of the electric market from the view of a public utility

    International Nuclear Information System (INIS)

    Schwab, J.

    1999-01-01

    The competition associated with the liberalization of the electric power-supply markets and the altered customers behavior will require a fundamental reorientation in all commercial areas of the energy supply companies (ESC).The companies will only master these new challenges if they react promptly and in an appropriate flexible manner as well as with the demanded orientation attached to the market and to the customers. The strategy of reorientation of the ESC will be determined more and more by the customers and by demand less by supply and technology. The competition on the power-supply market will take predominately place in production and in commercialization. Thereby the commercialization of demand oriented products will be of increasing importance. On the partial markets of 'Industrial' and 'Contract'-customers and electric power trade the energy-suppliers must operate with different strategies. For the power-supplier the following results as consequences of the environment's change: trend to competition is irreversible, areas of creation of economic values are more important than supply stages, the net remains monopoly, new market participants will appear, the competition in the production will increase. The management-orientated way of the Grazer StadtwerkeAG as a public utility is to read as follows: increase the competence for competition, focus on the customer. (author)

  12. Hot dry rock geothermal energy for U.S. electric utilities. Draft final report

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    In order to bring an electric utility component into the study of hot dry rock geothermal energy called for in the Energy Policy Act of 1992 (EPAct), EPRI organized a one-day conference in Philadelphia on January 14,1993. The conference was planned as the first day of a two-day sequence, by coordinating with the U.S. Geological Survey (USGS) and the U.S. Department of Energy (DOE). These two federal agencies were charged under EPAct with the development of a report on the potential for hot dry rock geothermal energy production in the US, especially the eastern US. The USGS was given lead responsibility for a report to be done in association with DOE. The EPRI conference emphasized first the status of technology development and testing in the U.S. and abroad, i.e., in western Europe, Russia and Japan. The conference went on to address the extent of knowledge regarding the resource base in the US, especially in the eastern half of the country, and then to address some practical business aspects of organizing projects or industries that could bring these resources into use, either for thermal applications or for electric power generation.

  13. Electric melting furnace of solidifying radioactive waste by utilizing magnetic field and melting method

    International Nuclear Information System (INIS)

    Igarashi, Hiroshi.

    1990-01-01

    An electric melting furnace for solidification of radioactive wastes utilizing magnetic fields in accordance with the present invention comprises a plurality of electrodes supplying AC current to molten glass in a glass melting furnace and a plurality of magnetic poles for generating AC magnetic fields. Interactions between the current and the magnetic field, generated forces in the identical direction in view of time in the molten glass. That is, forces for promoting the flow of molten glass in the melting furnace are resulted due to the Fleming's left-hand rule. As a result, the following effects can be obtained. (1) The amount of heat ransferred from the molten glass to the starting material layer on the molten surface is increased to improve the melting performance. (2) For an identical melting performance, the size and the weight of the melting furnace can be reduced to decrease the amount of secondary wastes when the apparatus-life is exhausted. (3) Bottom deposits can be suppressed and prevented from settling and depositing to the reactor bottom by the promoted flow in the layer. (4) Further, the size of auxiliary electrodes for directly supplying electric current to heat the molten glass near the reactor bottom can be decreased. (I.S.)

  14. Utilizing Electric Vehicles to Assist Integration of Large Penetrations of Distributed Photovoltaic Generation Capacity

    Energy Technology Data Exchange (ETDEWEB)

    Tuffner, Francis K.; Chassin, Forrest S.; Kintner-Meyer, Michael CW; Gowri, Krishnan

    2012-11-30

    Executive Summary Introduction and Motivation This analysis provides the first insights into the leveraging potential of distributed photovoltaic (PV) technologies on rooftop and electric vehicle (EV) charging. Either of the two technologies by themselves - at some high penetrations – may cause some voltage control challenges or overloading problems, respectively. But when combined, there – at least intuitively – could be synergistic effects, whereby one technology mitigates the negative impacts of the other. High penetration of EV charging may overload existing distribution system components, most prominently the secondary transformer. If PV technology is installed at residential premises or anywhere downstream of the secondary transformer, it will provide another electricity source thus, relieving the loading on the transformers. Another synergetic or mitigating effect could be envisioned when high PV penetration reverts the power flow upward in the distribution system (from the homes upstream into the distribution system). Protection schemes may then no longer work and voltage violation (exceeding the voltage upper limited of the ANSI voltage range) may occur. In this particular situation, EV charging could absorb the electricity from the PV, such that the reversal of power flow can be reduced or alleviated. Given these potential mutual synergistic behaviors of PV and EV technologies, this project attempted to quantify the benefits of combining the two technologies. Furthermore, of interest was how advanced EV control strategies may influence the outcome of the synergy between EV charging and distributed PV installations. Particularly, Californian utility companies with high penetration of the distributed PV technology, who have experienced voltage control problems, are interested how intelligent EV charging could support or affect the voltage control

  15. A distributed process monitoring system for nuclear powered electrical generating facilities

    International Nuclear Information System (INIS)

    Sweney, A.D.

    1991-01-01

    Duke Power Company is one of the largest investor owned utilities in the United States, with a service area of 20,000 square miles extending across North and South Carolina. Oconee Nuclear Station, one of Duke Power's three nuclear generating facilities, is a three unit pressurized water reactor site and has, over the course of its 15-year operating lifetime, effectively run out of plant processing capability. From a severely overcrowded cable spread room to an aging overtaxed Operator Aid Computer, the problems with trying to add additional process variables to the present centralized Operator Aid Computer are almost insurmountable obstacles. This paper reports that for this reason, and to realize the inherent benefits of a distributed process monitoring and control system, Oconee has embarked on a project to demonstrate the ability of a distributed system to perform in the nuclear power plant environment

  16. Factors associated with utilization of dental services in a long-term care facility: a descriptive cross-sectional study.

    Science.gov (United States)

    Scannapieco, Frank A; Amin, Summar; Salme, Marc; Tezal, Mine

    2017-03-01

    To describe factors associated with the utilization of dental services in a long-term care facility (LTCF) in Western New York. A descriptive cross-sectional study reviewed the dental and medical records of residents of an LTCF discharged between January 1, 2008 and December 30, 2012. Information on demographic and health variables at admission was extracted from electronic health records. Information on oral health variables was extracted from patient charts. A total of 2,516 residents were discharged between 2008 and 2012. From those, 259 (10.3%) utilized dental services at least once during their stay. Those who utilized dental services were significantly older at admission (78.5 vs. 82.0 years, p dental services. Dental services appear to be underutilized by residents of LTCF. Significant differences exist in demographic and health variables between residents who utilize these services compared to those who do not. © 2016 Special Care Dentistry Association and Wiley Periodicals, Inc.

  17. Utilization and Predictors of Electrical Cardioversion in Patients Hospitalized for Atrial Fibrillation

    Directory of Open Access Journals (Sweden)

    Yogita M. Rochlani

    2016-01-01

    Full Text Available Atrial fibrillation (AF is a common arrhythmia in adults associated with thromboembolic complications. External electrical cardioversion (DCCV is a safe procedure used to convert AF to normal sinus rhythm. We sought to study factors that affect utilization of DCCV in hospitalized patients with AF. The study sample was drawn from the Nationwide Inpatient Sample (NIS of the Healthcare Cost and Utilization Project in the United States. Patients with a primary discharge diagnosis of AF that received DCCV during hospitalization in the years 2000–2010 were included. An estimated 2,810,530 patients with a primary diagnosis of AF were hospitalized between 2001 and 2010, of which 1,19,840 (4.26% received DCCV. The likelihood of receiving DCCV was higher in patients who were males, whites, privately insured, and aged < 40 years and those with fewer comorbid conditions. Higher CHADS2 score was found to have an inverse association with DCCV use. In-hospital stroke, in-hospital mortality, length of stay, and cost for hospitalization were significantly lower for patients undergoing DCCV during AF related hospitalization. Further research is required to study the contribution of other disease and patient related factors affecting the use of this procedure as well as postprocedure outcomes.

  18. Measuring the costs of photovoltaics in an electric utility planning framework

    International Nuclear Information System (INIS)

    Awerbuch, Shimon

    1993-01-01

    Utility planning models evaluate alternative generating options using the revenue requirements method-an engineering-oriented, discounted cash-flow (DCF) methodology that has been widely used for over three decades. Discounted cash-flow techniques were conceived in the context of active expense-intensive technologies, such as conventional, fuel-intensive power generation. Photovoltaic (PV) technology, by contrast, is passive and capital intensive-attributes that are similar to those of other new process technologies, such as computer-integrated manufacturing. Discounted cash-flow techniques have a dismal record for correctly valuing new technologies with these attributes, in part because their benefits cannot be easily measured using traditional accounting concepts. This paper examines how these issues affect cost measurement in both conventional and PV-based electricity, and presents kWh-cost estimates for three technologies (coal, gas and PV) using risk-adjusted approaches, which suggest that PV costs are generally equivalent to the gas/combined cycle and about twice the cost of base-load coal (environmental externalities are ignored). Finally, the paper evaluates independent power purchases for a typical US utility and finds that in such a setting the cost of PV-based power is comparable to the firm's published avoided costs. (author)

  19. Distance from health facility and mothers' perception of quality related to skilled delivery service utilization in northern Ethiopia.

    Science.gov (United States)

    Fisseha, Girmatsion; Berhane, Yemane; Worku, Alemayehu; Terefe, Wondwossen

    2017-01-01

    Poor maternal health service utilization is one of the contributing factors to a high level of maternal and newborn mortality in Ethiopia. The factors associated with utilization of services are believed to differ from one context to another. We assessed the factors associated with skilled delivery service utilization in rural northern Ethiopia. A community-based survey was conducted among mothers who gave birth in the 12 months preceding the study period, from January to February 2015, in the Tigray region of Ethiopia. Multistage sampling technique was used to select mothers from the identified clusters. Households within a 10 km radius of the health facility were taken as a cluster for a community survey. Data were collected using face-to-face interview at the household level. We compared the mothers who reported giving birth to the index child in a health facility and those who reported delivering at home, in order to identify the predictors of skilled delivery utilization. Multivariable logistic regression model was used to determine the predictors of skilled delivery service utilization. The results are presented with odds ratio (OR) and 95% confidence interval (CI). A total of 1,796 mothers participated in the study, with a 100% response rate. Distance to health facilities (adjusted odds ratio [AOR] =0.53 [95% CI: 0.39, 0.71]), perception of mothers to the availability of adequate equipment in the delivery service in their catchment area (AOR =1.5 [95% CI: 1.11, 2.13]), experiencing any complication during childbirth, using antenatal care, lower birth order and having an educated partner were the significant predictors of skilled delivery service utilization. Implementing community-based intervention programs that will address the physical accessibility of delivery services, such as the ambulance service, road issues and waiting rooms, and improving quality maternity service will likely reduce the current problem.

  20. Distance from health facility and mothers’ perception of quality related to skilled delivery service utilization in northern Ethiopia

    Science.gov (United States)

    Fisseha, Girmatsion; Berhane, Yemane; Worku, Alemayehu; Terefe, Wondwossen

    2017-01-01

    Background Poor maternal health service utilization is one of the contributing factors to a high level of maternal and newborn mortality in Ethiopia. The factors associated with utilization of services are believed to differ from one context to another. We assessed the factors associated with skilled delivery service utilization in rural northern Ethiopia. Subjects and methods A community-based survey was conducted among mothers who gave birth in the 12 months preceding the study period, from January to February 2015, in the Tigray region of Ethiopia. Multistage sampling technique was used to select mothers from the identified clusters. Households within a 10 km radius of the health facility were taken as a cluster for a community survey. Data were collected using face-to-face interview at the household level. We compared the mothers who reported giving birth to the index child in a health facility and those who reported delivering at home, in order to identify the predictors of skilled delivery utilization. Multivariable logistic regression model was used to determine the predictors of skilled delivery service utilization. The results are presented with odds ratio (OR) and 95% confidence interval (CI). Results A total of 1,796 mothers participated in the study, with a 100% response rate. Distance to health facilities (adjusted odds ratio [AOR] =0.53 [95% CI: 0.39, 0.71]), perception of mothers to the availability of adequate equipment in the delivery service in their catchment area (AOR =1.5 [95% CI: 1.11, 2.13]), experiencing any complication during childbirth, using antenatal care, lower birth order and having an educated partner were the significant predictors of skilled delivery service utilization. Conclusion Implementing community-based intervention programs that will address the physical accessibility of delivery services, such as the ambulance service, road issues and waiting rooms, and improving quality maternity service will likely reduce the current

  1. Utility experiences in redevelopment of formerly used sites -- Wisconsin Electric's risk management and economic development activities

    International Nuclear Information System (INIS)

    Borofka, B.P.

    1999-01-01

    Wisconsin Electric Power Company, which recently celebrated its 100th anniversary, has actively promoted the redevelopment of its former sites as well as those of its customers. Serving Milwaukee and southeast Wisconsin, Wisconsin Electric's (WE) sites include former power plants, landfills, right-of-ways, and manufactured gas plant sites. In setting an example for others, as well as seeking to maximize the economic value of these sites, WE has either redeveloped or promoted the redevelopment of these sites by others. Examples include the East Wells Power Plant (now home of the Milwaukee Repertory Theater), the Lakeside Power Plant Site (now the home of Harnischfeger Corporation's headquarters), and the Commerce Street Power Plant located on the Milwaukee River near downtown Milwaukee. In each case the company evaluated the potential environmental liabilities against the unrealized asset value derived from facility location, site size, architectural uniqueness, or other characteristics. At the Commerce Street Power Plant, walking distance to the downtown Milwaukee business district combined with river frontage, were significant site values leveraged against a $5 million asbestos and lead-based paint removal project done to prepare the plant for marketing. More recently, WE has used its experience in promoting the redevelopment of the Menomonee River Valley, the original core of Milwaukee's industrial community, and in advancing a more practical regulatory approach to redeveloping older sites. Finally, the company is working with a non-profit community health clinic, community groups and local foundations in linking these redevelopment activities with the economic and physical health of inner city residents

  2. Review Article : Utilization of Environmental Radiochemistry Techniques for Selection and Evaluation of Nuclear Facility Sites

    International Nuclear Information System (INIS)

    Atta, E.R.; Madbouly, A.M.; Zakaria, Kh.M.

    2016-01-01

    This research review puts necessary considerations on the available environmental radiochemistry techniques for selection and evaluation of a nuclear facility sites.The main bjective in site evaluation for nuclear facilities in terms of nuclear safety is to protect the site workers, the public and the environment from the effects of ionizing radiation release from nuclear facilities due to accidents. The extreme sensitivity and speed of radiochemical methods make their applications of considerable importance in several fields and they have found many uses. Information about the existed radioactivity in the different nuclear facilities is an essential requirement for their environmental assessment. It is necessary to estimate the various radioactivity levels in the environment through qualitative and quantitative analytical techniques and to assess the potential effects of the nuclear facility in the region by considering the characteristics of sites.The siting and site evaluation requirements are discussed. Emphasis was given to types of radiochemical techniques used for characterization of the site parameters which determine the potential hazards of the site on the facility and the facility on the site. Emphasis has been also given to the quantitative and qualitative analysis of naturally occurring radionuclides for monitoring and control .There are some techniques employed such as radioactive tracer technique, liquid scintillation technique, gamma spectrometry technique, neutron activation analysis technique, fluorimetric technique and isotope hydrology technique.

  3. Environmental challenges and opportunities of the evolving North American electricity market : European electricity generating facilities: an overview of European regulatory requirements and standardization efforts

    International Nuclear Information System (INIS)

    Nichols, L.

    2002-06-01

    Several factors are affecting power generating facilities, such as the opening of both electricity and gas markets, and the pressure applied on generators and governments to ensure a steady energy supply for consumers. An additional factor is the pressure for the closing of nuclear power facilities. European siting and emissions requirements for coal-fired and natural gas generating facilities were presented in this background paper. In addition, the author provided an overview of the standardization process in place in Europe. The European Union and its functioning were briefly described, as well as a listing of relevant organizations. The current trends were examined. The document first introduced the European Union, and the next section dealt with Regulatory regime: the internal energy market. The third section examined the issue of Regulatory regime: generation and environmental regulations. Section four presented environmental management systems, followed by a section on standardization. Section six discussed European organizations involved in electricity issues, while the following section dealt with European commission programs. The last section briefly looked at the trends in the electricity sector, broaching topics such as compliance, electricity generation, and emissions trading. 52 refs., 2 tabs

  4. Study on applying technology of utilizing long-term materials for corrosion facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jae Chul; Park, Young Kyu; Baek, Soo Gon; Lee, Jong Sub [Korea Electric Power Research Institute, Taejon (Korea, Republic of); Park, Yong Soo [Yonsei University, Seoul (Korea, Republic of); Hwang, Won Suk [Inha University (Korea, Republic of); Song, Rhyo Seong [Hankuk Aviation, University (Korea, Republic of)

    1996-12-31

    Nowadays, as the pollution in seawater is escalating rapidly because of fast industrialization, corrosion rate and repairing frequency of seawater facilities in power plant are increasing. In addition, new construction is restricted with narrow limits due to the deterioration of social condition, asking for extension of facility life and repairing frequency. The objectives of this study are to select the appropriate new high corrosion resistance materials and apply them in the field, to make the corrosion data base in accordance with their usage conditions and to predict the remaining life and optimum repairing period by predicting the life of facilities. (author). 77 refs., 54 figs.

  5. Test facility of proton beam utilization of the PEFP at the SNU-AMS tandem accelerator

    International Nuclear Information System (INIS)

    Kim, K. R.; Park, B. S.; Lee, H. R.

    2004-01-01

    The PEFP (Proton Engineering Frontier Project) will supply users with a 20-MeV proton beam by the middle of 2007. A survey on users' demand was performed to draw the concept for the 20-MeV user facilities and to investigate users' requirements. In the mean time, a 6-MeV test facility has been developed to give users opportunities to experiment with proton beams. That facility will be attached to the 3-MV tandem accelerator at Seoul National University.

  6. Region-specific study of the electric utility industry: financial history and future power requirements for the VACAR region

    International Nuclear Information System (INIS)

    Pochan, M.J.

    1985-07-01

    Financial data for the period 1966 to 1981 are presented for the four investor-owned electric utilities in the VACAR (Virginia-Carolinas) region. This region was selected as representative for the purpose of assessing the availability, reliability, and cost of electric power for the future in the United States. The estimated demand for power and planned additions to generating capacity for the region through the year 2000 are also given

  7. Influences of Inadequate Instructional Materials and Facilities in Teaching and Learning of Electrical/Electronics Technology Education Courses

    Science.gov (United States)

    Ogbu, James E.

    2015-01-01

    This study investigated the influences of inadequate instructional materials and facilities in the teaching and learning of electrical/electronics (E/E) technology education courses. The study was guided by two research questions and two null hypotheses which were tested at 0.05 level of significance. The design employed was descriptive survey…

  8. Can we delay the replacement of this component?-an asset management approach to the question [for electric utilities

    DEFF Research Database (Denmark)

    Østergaard, Jacob; Jensen, A. Norsk

    2001-01-01

    Asset management is emerging as a new approach on how to exploit an electric utility physical asset in the most profitable way. One of the major questions to answer by the asset management staff is when to do replacements? This is a difficult question, which require weighting of several parameter...... on Windows CE handheld computers which are presented in this paper. The calculations shown in the paper are based on this tool, and the software system is today available and used by Danish electric utilities....

  9. NRC review of Electric Power Research Institute's Advanced Light Reactor Utility Requirements Document - Program summary, Project No. 669

    International Nuclear Information System (INIS)

    1992-08-01

    The staff of the US Nuclear Regulatory Commission has prepared Volume 1 of a safety evaluation report (SER), ''NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Program Summary,'' to document the results of its review of the Electric Power Research Institute's ''Advanced Light Water Reactor Utility Requirements Document.'' This SER provides a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review

  10. The application of financial options theory to electric utility decision making in integrated resource planning and maintenance shutdowns

    International Nuclear Information System (INIS)

    Felder, F.

    1995-01-01

    Increased competition in wholesale power generation will allow electric utilities to use financial models to improve their decision making. This competition will result in the creation of electricity spot, futures, and forward markets, which will provide necessary information for utility executives to used advance financial tools, such as random walk models and options theory. These models will allow executives to place a value on risk. Once this value is known, executives can determine how best to manage that risk, whether by entering into financial transactions, adjusting their operational and planning decisions, or both

  11. A critical assessment of the Hong Kong Government's proposed post-2008 regulatory regime for local electricity utilities

    International Nuclear Information System (INIS)

    Woo, Chi-Keung; Horowitz, Ira; Tishler, Asher

    2006-01-01

    In December 2005, the Hong Kong Government issued a 'Consultation Paper on Future Development of the Electricity Markets in Hong Kong: Stage II Consultation,' proposing a post-2008 regulatory regime upon the expiration of the existing regulatory contract between the Hong Kong Government and each of the two local electricity utilities. We assess the proposal using the criteria of safe, reliable, and environmentally friendly service at the lowest rates that will allow the utilities reasonable returns on their investments. We caution that if fully adopted, the highly risky proposal may lead to less-reliable service without the compensating benefits to the environment

  12. Distance from health facility and mothers’ perception of quality related to skilled delivery service utilization in northern Ethiopia

    Directory of Open Access Journals (Sweden)

    Fisseha G

    2017-10-01

    Full Text Available Girmatsion Fisseha,1 Yemane Berhane,2 Alemayehu Worku,2,3 Wondwossen Terefe1 1Mekelle University, College of Health Science, School of Public Health, Mekelle, Ethiopia; 2Addis Continental Institute of Public Health, Epidemiology Department, Addis Ababa, Ethiopia; 3Addis Ababa University, School of Public Health, Biostatistics Department, Addis Ababa, Ethiopia Background: Poor maternal health service utilization is one of the contributing factors to a high level of maternal and newborn mortality in Ethiopia. The factors associated with utilization of services are believed to differ from one context to another. We assessed the factors associated with skilled delivery service utilization in rural northern Ethiopia.Subjects and methods: A community-based survey was conducted among mothers who gave birth in the 12 months preceding the study period, from January to February 2015, in the Tigray region of Ethiopia. Multistage sampling technique was used to select mothers from the identified clusters. Households within a 10 km radius of the health facility were taken as a cluster for a community survey. Data were collected using face-to-face interview at the household level. We compared the mothers who reported giving birth to the index child in a health facility and those who reported delivering at home, in order to identify the predictors of skilled delivery utilization. Multivariable logistic regression model was used to determine the predictors of skilled delivery service utilization. The results are presented with odds ratio (OR and 95% confidence interval (CI.Results: A total of 1,796 mothers participated in the study, with a 100% response rate. Distance to health facilities (adjusted odds ratio [AOR] =0.53 [95% CI: 0.39, 0.71], perception of mothers to the availability of adequate equipment in the delivery service in their catchment area (AOR =1.5 [95% CI: 1.11, 2.13], experiencing any complication during childbirth, using antenatal care, lower

  13. The Research of Utilization Hours of Coal-Fired Power Generation Units Based on Electric Energy Balance

    Science.gov (United States)

    Liu, Junhui; Yang, Jianlian; Wang, Jiangbo; Yang, Meng; Tian, Chunzheng; He, Xinhui

    2018-01-01

    With grid-connected scale of clean energy such as wind power and photovoltaic power expanding rapidly and cross-province transmission scale being bigger, utilization hours of coal-fired power generation units become lower and lower in the context of the current slowdown in electricity demand. This paper analyzes the influencing factors from the three aspects of demand, supply and supply and demand balance, and the mathematical model has been constructed based on the electric energy balance. The utilization hours of coal-fired power generation units have been solved considering the relationship among proportion of various types of power installed capacity, the output rate and utilization hours. By carrying out empirical research in Henan Province, the utilization hours of coal-fired units of Henan Province in 2020 has been achieved. The example validates the practicability and the rationality of the model, which can provide a basis for the decision-making for coal-fired power generation enterprises.

  14. Protection of electricity distribution networks

    CERN Document Server

    Gers, Juan; Institution of Engineering and Technology

    2011-01-01

    Combining a theoretical background with examples and exercises, this book allows the reader to easily follow requirements for high quality electrical service in utilities and industrial facilities around the world.

  15. Updated Value of Service Reliability Estimates for Electric Utility Customers in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Michael [Nexant Inc., Burlington, MA (United States); Schellenberg, Josh [Nexant Inc., Burlington, MA (United States); Blundell, Marshall [Nexant Inc., Burlington, MA (United States)

    2015-01-01

    This report updates the 2009 meta-analysis that provides estimates of the value of service reliability for electricity customers in the United States (U.S.). The meta-dataset now includes 34 different datasets from surveys fielded by 10 different utility companies between 1989 and 2012. Because these studies used nearly identical interruption cost estimation or willingness-to-pay/accept methods, it was possible to integrate their results into a single meta-dataset describing the value of electric service reliability observed in all of them. Once the datasets from the various studies were combined, a two-part regression model was used to estimate customer damage functions that can be generally applied to calculate customer interruption costs per event by season, time of day, day of week, and geographical regions within the U.S. for industrial, commercial, and residential customers. This report focuses on the backwards stepwise selection process that was used to develop the final revised model for all customer classes. Across customer classes, the revised customer interruption cost model has improved significantly because it incorporates more data and does not include the many extraneous variables that were in the original specification from the 2009 meta-analysis. The backwards stepwise selection process led to a more parsimonious model that only included key variables, while still achieving comparable out-of-sample predictive performance. In turn, users of interruption cost estimation tools such as the Interruption Cost Estimate (ICE) Calculator will have less customer characteristics information to provide and the associated inputs page will be far less cumbersome. The upcoming new version of the ICE Calculator is anticipated to be released in 2015.

  16. Design study of wind turbines, 50 kW to 3000 kW for electric utility applications: Executive summary

    Science.gov (United States)

    1977-01-01

    Preliminary designs of low power (50 to 500 kW) and high power (500 to 3000 kW) wind generator systems (WGS) for electric utility applications were developed. These designs provide the bases for detail design, fabrication, and experimental demonstration testing of these units at selected utility sites. Several feasible WGS configurations were evaluated, and the concept offering the lowest energy cost potential and minimum technical risk for utility applications was selected. The selected concept was optimized utilizing a parametric computer program prepared for this purpose. The utility requirements evaluation task examined the economic, operational and institutional factors affecting the WGS in a utility environment, and provided additional guidance for the preliminary design effort. Results of the conceptual design task indicated that a rotor operating at constant speed, driving an AC generator through a gear transmission is the most cost effective WGS configuration.

  17. Utilization of the Pilot Scale Demonstration Facility for Vitrification of Low and Intermediate Level Radioactive Wastes

    International Nuclear Information System (INIS)

    Oh, Won Zin; Choi, W. K.; Jung, C. H.; Won, H. J.; Song, P. S.; Min, B. Y.; Park, H. S.; Jung, K. K.; Yun, K. S.

    2005-10-01

    A series of maintenance and repair work for normalization of the pilot scale vitrification demonstration facility was completed successfully to develop the waste treatment in high temperature and melting technology. It was investigated that the treatment of combustible and non-combustible wastes produced at the KAERI site is technically feasible in the pilot scale vitrification demonstration facility which is designed to be able to treat various kinds of radioactive wastes such as combustible and non-combustible wastes including soil and concrete. The vitrification test facility can be used as the R and D and the technology demonstration facility for melt decontamination of the metallic wastes which have a fixed specification. The modification of the RI storage room in the pilot scale vitrification demonstration facility and the licensing according to the facility modification were completed for the R and D on melt decontamination of dismantled metallic wastes which is carrying out as one of the national long-term R and D projects on nuclear energy. The lab-scale melt decontamination apparatus was installed in modified RI storage room and the characteristics of melt decontamination will be examined using various metallic wastes. It is expected that the economical feasibility on the volume reduction and recycle of metallic wastes will be escalated in the present situation when the unit cost for waste disposal has the tendency to grow up gradually. Therefore, the pilot scale vitrification demonstration facility can be used for the technology development for the volume reduction and recycle of the metallic wastes generated from on-going projects on the decommissioning of research reactors and the environmental restoration of uranium conversion plant, and for the treatment of radioactive solid wastes produced at the KAERI site

  18. Utilization of the Pilot Scale Demonstration Facility for Vitrification of Low and Intermediate Level Radioactive Wastes

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Won Zin; Choi, W. K.; Jung, C. H.; Won, H. J.; Song, P. S.; Min, B. Y.; Park, H. S.; Jung, K. K.; Yun, K. S

    2005-10-15

    A series of maintenance and repair work for normalization of the pilot scale vitrification demonstration facility was completed successfully to develop the waste treatment in high temperature and melting technology. It was investigated that the treatment of combustible and non-combustible wastes produced at the KAERI site is technically feasible in the pilot scale vitrification demonstration facility which is designed to be able to treat various kinds of radioactive wastes such as combustible and non-combustible wastes including soil and concrete. The vitrification test facility can be used as the R and D and the technology demonstration facility for melt decontamination of the metallic wastes which have a fixed specification. The modification of the RI storage room in the pilot scale vitrification demonstration facility and the licensing according to the facility modification were completed for the R and D on melt decontamination of dismantled metallic wastes which is carrying out as one of the national long-term R and D projects on nuclear energy. The lab-scale melt decontamination apparatus was installed in modified RI storage room and the characteristics of melt decontamination will be examined using various metallic wastes. It is expected that the economical feasibility on the volume reduction and recycle of metallic wastes will be escalated in the present situation when the unit cost for waste disposal has the tendency to grow up gradually. Therefore, the pilot scale vitrification demonstration facility can be used for the technology development for the volume reduction and recycle of the metallic wastes generated from on-going projects on the decommissioning of research reactors and the environmental restoration of uranium conversion plant, and for the treatment of radioactive solid wastes produced at the KAERI site.

  19. Exploring the relationship between planning and procurement in Western U.S. electric utilities

    Energy Technology Data Exchange (ETDEWEB)

    Carvallo Bodelon, Juan Pablo [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Analysis and Environmental Impacts Division; Sanstad, Alan H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Analysis and Environmental Impacts Division; Larsen, Peter H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Analysis and Environmental Impacts Division

    2017-06-01

    Integrated resource planning (IRP) is an important regulatory process used in many U.S. states to formulate and evaluate least-cost and risk-assessed portfolios to meet future load requirements for electric utilities. In principle, effective implementation of IRP seeks to assure regulators and the public that utility investment decisions, given uncertainty, are as cost-effective as possible. However, to date, there is no empirical assessment on the effectiveness of IRP implementation. In this analysis, we compare planning, procurement processes and actual decisions for a sample of twelve load serving entities (LSEs) across the Western U. S. from 2003-2014. The 2008/2009 recession provides a unique “stress test” to the planning process and offers an excellent opportunity to trace how procurement decisions responded to this largely unforeseen event. In aggregate, there is a general alignment between planned and procured supply-side capacity. However, there are significant differences in the choice of supply-side resources and type of ownership for individual LSEs. We develop case studies for three LSEs and find that subsequent plans differ significantly due to changes in the planning environment and that procurement decisions in some cases are impacted by factors that are not accounted for in the planning process. Our results reveal that a limited amount of information produced during the long-term planning process (e.g., forecasts, methods, and least cost/risk portfolios) are ultimately used during the procurement process, and that the latter process relies extensively on the most recent information available for decision making. These findings suggest that states' IRP rules and regulations mandating long-term planning horizons with the same analytical complexity throughout the planning period may not create useful information for the procurement process. The social value of a long-term planning process that departs from procurement and the balance between

  20. JV Task 126 - Mercury Control Technologies for Electric Utilities Burning Bituminous Coal

    Energy Technology Data Exchange (ETDEWEB)

    Jason Laumb; John Kay; Michael Jones; Brandon Pavlish; Nicholas Lentz; Donald McCollor; Kevin Galbreath

    2009-03-29

    The EERC developed an applied research consortium project to test cost-effective mercury (Hg) control technologies for utilities burning bituminous coals. The project goal was to test innovative Hg control technologies that have the potential to reduce Hg emissions from bituminous coal-fired power plants by {ge}90% at costs of one-half to three-quarters of current estimates for activated carbon injection (ACI). Hg control technology evaluations were performed using the EERC's combustion test facility (CTF). The CTF was fired on pulverized bituminous coals at 550,000 Btu/hr (580 MJ/hr). The CTF was configured with the following air pollution control devices (APCDs): selective catalytic reduction (SCR) unit, electrostatic precipitator (ESP), and wet flue gas desulfurization system (WFDS). The Hg control technologies investigated as part of this project included ACI (three Norit Americas, Inc., and eleven Envergex sorbents), elemental mercury (Hg{sup 0}) oxidation catalysts (i.e., the noble metals in Hitachi Zosen, Cormetech, and Hitachi SCR catalysts), sorbent enhancement additives (SEAs) (a proprietary EERC additive, trona, and limestone), and blending with a Powder River Basin (PRB) subbituminous coal. These Hg control technologies were evaluated separately, and many were also tested in combination.

  1. Selection of facility location under environmental damage priority and using ELECTRE method.

    Science.gov (United States)

    Gundogdu, Ceren Erdin

    2011-03-01

    In the recent years, the environmental problems have reached to a vital extent, which is pushing the boundaries and far beyond daily evaluations. Industrial plants, the energy sources and uncontrolled release of pollutant gases (SO2, CO2 etc.) in the production stage have the greatest share in the occurrence of unfavorable environmental conditions. For this reason, the dimension of the problems that may arise in the production stage of industrial plants is directly related to the selection of facility location. In this study, geographical regions (a total of 7 regions) of our country have been analyzed in terms of environmental values based on their basins and the unfavorable environmental problems that are currently being experienced. Considered as such, with the directives of an expert group composed of nature scientists, the criteria and alternative areas are determined using the data gathered on ecosystem, basin characteristics, and land types. Since the primary goal is to keep the environmental damages at the minimum level, comprehensive definition of the problem is constructed by consultation of the expert group and the criteria are determined. Considering the fact that it will prevent the drawbacks generated by making decisions depending on certain stereotypes toa great extent, ELECTRE (Elimination and Choice Translating Reality English - Elimination Et Choix Traduisant la Realite) method is used to determine in which geographic region our country's industrial plants should be located.

  2. Scaled Facility Design Approach for Pool-Type Lead-Bismuth Eutectic Cooled Small Modular Reactor Utilizing Natural Circulation

    Energy Technology Data Exchange (ETDEWEB)

    Park, Sangrok; Shin, Yong-Hoon; Lee, Jueun; Hwang, Il Soon [Seoul National University, Seoul (Korea, Republic of)

    2015-10-15

    In low carbon era, nuclear energy is the most prominent energy source of electricity. For steady ecofriendly nuclear energy supply, Generation IV reactors which are future nuclear reactor require safety, sustainability, economics and non-proliferation as four criteria. Lead cooled fast reactor (LFR) is one of these reactor type and Generation IV international forum (GIF) adapted three reference LFR systems which are a small and movable systems with long life without refueling, intermediate size and huge electricity generation system for power grid. NUTRECK (Nuclear Transmutation Energy Center of Korea) has been designed reactor called URANUS (Ubiquitous, Rugged, Accident-forgiving, Non-proliferating, and Ultra-lasting Sustainer) which is small modular reactor and using lead-bismuth eutectic coolant. To prove natural circulation capability of URANUS and analyze design based accidents, scaling mock-up experiment facility will be constructed. In this paper, simple specifications of URANUS will be presented. Then based on this feature, scaling law and scaled facility design results are presented. To validate safety feature and thermodynamics characteristic of URANUS, scaled mockup facility of URANUS is designed based on the scaling law. This mockup adapts two area scale factors, core and lower parts of mock-up are scaled for 3D flow experiment. Upper parts are scaled different size to reduce electricity power and LBE tonnage. This hybrid scaling method could distort some thermal-hydraulic parameters, however, key parameters for experiment will be matched for up-scaling. Detailed design of mock-up will be determined through iteration for design optimization.

  3. The outline of investigation on integrity of JMTR concrete structures, cooling system and utility facilities

    International Nuclear Information System (INIS)

    Ebisawa, Hiroyuki; Hanakawa, Hiroki; Asano, Norikazu; Kusunoki, Hidehiko; Yanai, Tomohiro; Sato, Shinichi; Miyauchi, Masaru; Ohto, Tsutomu; Kimura, Tadashi; Kawamata, Takanori; Nemoto, Nobuaki; Watahiki, Shunsuke; Hanawa, Yoshio; Tsuboi, Kazuaki; Ogasawara, Yasushi; Nemoto, Hiroyoshi; Echigoya, Shinichi; Ohtsuka, Kaoru; Onoue, Ryuji; Koike, Sumio; Gorai, Shigeru; Nishiyama, Yutaka; Kurosawa, Akihiko; Hanawa, Nobuhiro; Tobita, Kenji; Tabata, Shuzo; Fukasaku, Akitomi; Isozaki, Takanori; Akashi, Kazutomo; Takahashi, Kunihiro; Tsuji, Tomoyuki

    2009-07-01

    The condition of facilities and machinery used continuously were investigated before the renewal work of JMTR on FY 2007. The subjects of investigation were reactor building, primary cooling system tanks, secondary cooling system piping and tower, emergency generator and so on. As the result, it was confirmed that some facilities and machinery were necessary to repair and others were used continuously for long term by maintaining on the long-term maintenance plan. JMTR is planed to renew by the result of this investigation. (author)

  4. The state of energy storage in electric utility systems and its effect on renewable energy resources

    Energy Technology Data Exchange (ETDEWEB)

    Rau, N S

    1994-08-01

    This report describes the state of the art of electric energy storage technologies and discusses how adding intermittent renewable energy technologies (IRETs) to a utility network affects the benefits from storage dispatch. Load leveling was the mode of storage dispatch examined in the study. However, the report recommended that other modes be examined in the future for kilowatt and kilowatt-hour optimization of storage. The motivation to install storage with IRET generation can arise from two considerations: reliability and enhancement of the value of energy. Because adding storage increases cost, reliability-related storage is attractive only if the accruing benefits exceed the cost of storage installation. The study revealed that the operation of storage should not be guided by the output of the IRET but rather by system marginal costs. Consequently, in planning studies to quantify benefits, storage should not be considered as an entity belonging to the system and not as a component of IRETS. The study also indicted that because the infusion of IRET energy tends to reduce system marginal cost, the benefits from load leveling (value of energy) would be reduced. However, if a system has storage, particularly if the storage is underutilized, its dispatch can be reoriented to enhance the benefits of IRET integration.

  5. Does employee safety influence customer satisfaction? Evidence from the electric utility industry.

    Science.gov (United States)

    Willis, P Geoffrey; Brown, Karen A; Prussia, Gregory E

    2012-12-01

    Research on workplace safety has not examined implications for business performance outcomes such as customer satisfaction. In a U.S. electric utility company, we surveyed 821 employees in 20 work groups, and also had access to archival safety data and the results of a customer satisfaction survey (n=341). In geographically-based work units where there were more employee injuries (based on archival records), customers were less satisfied with the service they received. Safety climate, mediated by safety citizenship behaviors (SCBs), added to the predictive power of the group-level model, but these two constructs exerted their influence independently from actual injuries. In combination, two safety-related predictor paths (injuries and climate/SCB) explained 53% of the variance in customer satisfaction. Results offer preliminary evidence that workplace safety influences customer satisfaction, suggesting that there are likely spillover effects between the safety environment and the service environment. Additional research will be needed to assess the specific mechanisms that convert employee injuries into palpable results for customers. Better safety climate and reductions in employee injuries have the potential to offer payoffs in terms of what customers experience. Copyright © 2012 National Safety Council and Elsevier Ltd. All rights reserved.

  6. Mergers, acquisitions, divestitures, and applications for market-based rates in a deregulating electric utility industry

    International Nuclear Information System (INIS)

    Cox, A.J.

    1999-01-01

    In this article, the author reviews FERC's current procedures for undertaking competitive analysis. The current procedure for evaluating the competitive impact of transactions in the electric utility industry is described in Order 592, in particular Appendix A. These procedures effectively revised criteria that had been laid out in Commonwealth Edison and brought its merger policy in line with the EPAct and the provisions of Order 888. Order 592 was an attempt to provide more certainty and expedition in handling mergers. It established three criteria that had to be satisfied for a merger to be approved: Post-merger market power must be within acceptable thresholds or be satisfactorily mitigated, acceptable customer protections must be in place (to ensure that rates will not go up as a result of increased costs) and any adverse effect on regulation must be addressed. FERC states that its Order 592 Merger Policy Statement is based upon the Horizontal Merger Guidelines issued jointly by the Federal Trade Commission and the Antitrust Division Department of Justice (FTC/DOJ Merger Guidelines). While it borrows much of the language and basic concepts of the Merger Guidelines, FERC's procedures have been criticized as not following the methodology closely enough, leaving open the possibility of mistakes in market definition

  7. Measuring corporate social responsibility using composite indices: Mission impossible? The case of the electricity utility industry

    Directory of Open Access Journals (Sweden)

    Juan Diego Paredes-Gazquez

    2016-01-01

    Full Text Available Corporate social responsibility is a multidimensional concept that is often measured using diverse indicators. Composite indices can aggregate these single indicators into one measurement. This article aims to identify the key challenges in constructing a composite index for measuring corporate social responsibility. The process is illustrated by the construction of a composite index for measuring social outcomes in the electricity utility industry. The sample consisted of seventy-four companies from twenty-three different countries, and one special administrative region operating in the industry in 2011. The findings show that (1 the unavailability of information about corporate social responsibility, (2 the particular characteristics of this information and (3 the weighting of indicators are the main obstacles when constructing the composite index. We highlight than an effective composite index should has a clear objective, a solid theoretical background and a robust structure. In a practical sense, it should be reconsidered how researchers use composite indexes to measure corporate social responsibility, as more transparency and stringency is needed when constructing these tools.

  8. Estimation of cost-effectiveness of the Finnish electricity distribution utilities

    Energy Technology Data Exchange (ETDEWEB)

    Kopsakangas-Savolainen, Maria; Svento, Rauli [Department of Economics, University of Oulu (Finland)

    2008-03-15

    This paper examines the cost-effectiveness of Finnish electricity distribution utilities. We estimate several panel data stochastic frontier specifications using both Cobb-Douglas and Translog model specifications. The conventional models are extended in order to model observed heterogeneity explicitly in the cost frontier models. The true fixed effects model has been used as a representative of the models which account for unobserved heterogeneity and extended conventional random effect models have been used in analysing the impact of observed heterogeneity. A comparison between the conventional random effects model and models where heterogeneity component is entered either into the mean or into the variance of the inefficiency term shows that relative efficiency scores diminish when heterogeneity is added to the analysis. The true fixed effects model on the other hand gives clearly smaller inefficiency scores than random effects models. In the paper we also show that the relative inefficiency scores and rankings are not sensitive to the cost function specification. Our analysis points out the importance of the efficient use of the existing distribution network. The economies of scale results suggest that firms could reduce their operating costs by using networks more efficiently. According to our results average size firms which have high load factors are the most efficient ones. All firms have unused capacities so that they can improve cost-effectiveness rather by increasing the average distributed volumes than by mergers. (author)

  9. Estimation of cost-effectiveness of the Finnish electricity distribution utilities

    International Nuclear Information System (INIS)

    Kopsakangas-Savolainen, Maria; Svento, Rauli

    2008-01-01

    This paper examines the cost-effectiveness of Finnish electricity distribution utilities. We estimate several panel data stochastic frontier specifications using both Cobb-Douglas and Translog model specifications. The conventional models are extended in order to model observed heterogeneity explicitly in the cost frontier models. The true fixed effects model has been used as a representative of the models which account for unobserved heterogeneity and extended conventional random effect models have been used in analysing the impact of observed heterogeneity. A comparison between the conventional random effects model and models where heterogeneity component is entered either into the mean or into the variance of the inefficiency term shows that relative efficiency scores diminish when heterogeneity is added to the analysis. The true fixed effects model on the other hand gives clearly smaller inefficiency scores than random effects models. In the paper we also show that the relative inefficiency scores and rankings are not sensitive to the cost function specification. Our analysis points out the importance of the efficient use of the existing distribution network. The economies of scale results suggest that firms could reduce their operating costs by using networks more efficiently. According to our results average size firms which have high load factors are the most efficient ones. All firms have unused capacities so that they can improve cost-effectiveness rather by increasing the average distributed volumes than by mergers

  10. Mergers, acquisitions, divestitures, and applications for market-based rates in a deregulating electric utility industry

    Energy Technology Data Exchange (ETDEWEB)

    Cox, A.J.

    1999-05-01

    In this article, the author reviews FERC's current procedures for undertaking competitive analysis. The current procedure for evaluating the competitive impact of transactions in the electric utility industry is described in Order 592, in particular Appendix A. These procedures effectively revised criteria that had been laid out in Commonwealth Edison and brought its merger policy in line with the EPAct and the provisions of Order 888. Order 592 was an attempt to provide more certainty and expedition in handling mergers. It established three criteria that had to be satisfied for a merger to be approved: Post-merger market power must be within acceptable thresholds or be satisfactorily mitigated, acceptable customer protections must be in place (to ensure that rates will not go up as a result of increased costs) and any adverse effect on regulation must be addressed. FERC states that its Order 592 Merger Policy Statement is based upon the Horizontal Merger Guidelines issued jointly by the Federal Trade Commission and the Antitrust Division Department of Justice (FTC/DOJ Merger Guidelines). While it borrows much of the language and basic concepts of the Merger Guidelines, FERC's procedures have been criticized as not following the methodology closely enough, leaving open the possibility of mistakes in market definition.

  11. Operational synergy in the US electric utility industry under an influence of deregulation policy: A linkage to financial performance and corporate value

    International Nuclear Information System (INIS)

    Sueyoshi, Toshiyuki; Goto, Mika

    2011-01-01

    have examined a synergy effect between electricity and gas services in the US electric utility industry. They have compared electricity-specialized firms with diversified utility firms in their financial performance and corporate value. A problem of their study is that it has not empirically measured the operational performance of the electric utility firms. As an extension of the preceding study, this research investigates the operational performance of 104 US electric utility firms (1990-2004) by fully utilizing DEA (Data Envelopment Analysis). This study finds the three new policy implications. First, the synergy effect has not existed in the operational performance of diversified utility firms before and after the deregulation on the US electricity markets. Thus, core business concentration is more effective for electric utility firms than corporate diversification to enhance their operational performance under the current US deregulation policy. Second, the operational performance has had an increasing trend until 1996 and a decreasing trend after 1996. Thus, the US deregulation policy has been influential on their operational performance. Third, the enhancement in operational performance of electric utility firms has improved their financial performance. The improvement in financial performance has increased their corporate value. Thus, this study finds the business causality among operational performance, financial performance and corporate value in the US electric utility industry. - Research Highlights: →The synergy effect has not existed in the operational performance of diversified utility firms before and after the deregulation on the US electricity markets. →Core business concentration is more effective for electric utility firms than corporate diversification to enhance their operational performance under the current US deregulation policy. →The operational performance has had an increasing trend until 1996 and a decreasing trend after 1996.

  12. Presence and generation of AC and DC electric fields and small ions in closed rooms as a function of building materials, utilization, and electrical installation

    International Nuclear Information System (INIS)

    Reiter, R.

    1985-01-01

    In the discussion on possible biological effects of natural atmospheric electric fields or electromagnetic radiation it is frequently overlooked that man, under normal living and working conditions in closed rooms, is also exposed to considerable fields of various types and strengths. Therefore an extensive ''inventory'' has been made of such ac and dc fields as they occur in rooms of different construction, utilization, and electrical equipment. Results are presented and discussed, also with respect to biological conditions, including some typical examples from the relevant literature

  13. Decree no. 2004-90 from January 28, 2004 relative to the compensation of electric public utility charges

    International Nuclear Information System (INIS)

    2004-03-01

    This decree defines the charges imputable to the missions of electric public utility, the procedure of determination of their amount, the contribution to these charges by end-users and the operations of recovery and transfer, the processing of declaration defects and payment failures and some other various dispositions. (J.S.)

  14. Spatio-temporal Facility Utilization Analysis from Exhaustive WiFi Monitoring

    DEFF Research Database (Denmark)

    Prentow, Thor Siiger; Ruiz-Ruiz, Antonio; Blunck, Henrik

    2015-01-01

    The optimization of logistics in large building complexes with many resources, such as hospitals, require realistic facility management and planning. Current planning practices rely foremost on manual observations or coarse unverified assumptions and therefore do not properly scale or provide rea...

  15. The Philippine electricity sector reform and the urban question: How metro Manila's utility is tackling urban poverty

    International Nuclear Information System (INIS)

    Mouton, Morgan

    2015-01-01

    In the early 2000s, the Philippine government reformed its electricity sector following neoliberal principles: unbundling of the power industry, privatisation of assets and commodification of electricity. This paper shows that the reform was primarily driven by the need to secure electricity supply and cut down tariffs. These national objectives ousted other issues, and notably those that find their expression at the urban level, among which the question of access to electricity in Metro Manila's urban poor communities. The central state withdrew its attention from the issue of electrification, and local actors had to react as they were confronted to social tensions and practices of pilferage. As a consequence, city governments and local administrations are getting involved in this issue, which opens the way to participation of civil society. This paper shows how the “rolling back” of the central state led to new partnerships and arrangements between the distribution utility, local governments and community organisations. This movement points to an urbanisation of energy issues, which could bring positive results for end-users provided that it is accompanied by a clearer regulatory framework. - Highlights: • The electricity reform did not take the urban poor into consideration. • The state retreated from issues of electrification. • Decentralisation favoured the emergence of new, local actors for this aspect of energy policy. • The distribution utility is left with an increased power over issues of access to electricity. • Territorially and qualitatively, electrification programs are more diverse

  16. Utilization of the Flexibility Potential of Electric Vehicles - an Alternative to Distribution Grid Reinforcements.

    OpenAIRE

    Ager-Hanssen, Siri Bruskeland; Myhre, Siri Olimb

    2015-01-01

    Today, the transport sector accounts for a large share of global emissions. Electric vehicles have many environmental advantages compared to conventional petrol vehicles. Hence, if electric vehicles can replace petrol vehicles, the transportation sector's total emissions can be significantly reduced. In Norway, due to policy incentives, it is expected that the number of electric vehicles will increase considerably in the near future. Despite the great advantages of electric vehicles, large pe...

  17. Utilities and offsites design baseline. Outside Battery Limits Facility 6000 tpd SRC-I Demonstration Plant. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-05-25

    As part of the overall Solvent Refined Coal (SRC-1) project baseline being prepared by International Coal Refining Company (ICRC), the RUST Engineering Company is providing necessary input for the Outside Battery Limits (OSBL) Facilities. The project baseline is comprised of: design baseline - technical definition of work; schedule baseline - detailed and management level 1 schedules; and cost baseline - estimates and cost/manpower plan. The design baseline (technical definition) for the OSBL Facilities has been completed and is presented in Volumes I, II, III, IV, V and VI. The OSBL technical definition is based on, and compatible with, the ICRC defined statement of work, design basis memorandum, master project procedures, process and mechanical design criteria, and baseline guidance documents. The design basis memorandum is included in Paragraph 1.3 of Volume I. The baseline design data is presented in 6 volumes. Volume I contains the introduction section and utility systems data through steam and feedwater. Volume II continues with utility systems data through fuel system, and contains the interconnecting systems and utility system integration information. Volume III contains the offsites data through water and waste treatment. Volume IV continues with offsites data, including site development and buildings, and contains raw materials and product handling and storage information. Volume V contains wastewater treatment and solid wastes landfill systems developed by Catalytic, Inc. to supplement the information contained in Volume III. Volume VI contains proprietary information of Resources Conservation Company related to the evaporator/crystallizer system of the wastewater treatment area.

  18. Operational experience in the non-destructive assay of fissile material in General Electric's nuclear fuel fabrication facility

    International Nuclear Information System (INIS)

    Stewart, J.P.

    1976-01-01

    Operational experience in the non-destructive assay of fissile material in a variety of forms and containers and incorporation of the assay devices into the accountability measurement system for General Electric's Wilmington Fuel Fabrication Facility measurement control programme is detailed. Description of the purpose and related operational requirements of each non-destructive assay system is also included. In addition, the accountability data acquisition and processing system is described in relation to its interaction with the various non-destructive assay devices and scales used for accountability purposes within the facility. (author)

  19. European Utility Requirements: leveling the European electricity producers' playing ground for new NPPs

    International Nuclear Information System (INIS)

    Bernard Roche

    2006-01-01

    Full text of publication follows: Since 1992, the European Utility Requirement (EUR) document has been developed by the major European electricity producers. The main driver to this work has been the construction of a unified European market. The electricity producers have set out design requirements adapted to this new European environment, while keeping in mind experience feedback from operating NPPs worldwide. The EUR document is now fully operational and its set of generic requirements have been recently used as bid specification in Finland and in China. The EUR document keeps developing in two directions: 1- completing the assessment of the projects that could be proposed by the vendors for the European market. Five projects have been assessed between 1999 and 2002: BWR90, EPR, EP1000, ABWR and SWR1000. Two new projects are being assessed, the Westinghouse AP1000 and the Russian VVER AES92. It is currently planned to publish these two new assessments in the first half of 2006. Others may be undertaken meanwhile. 2- revision of the generic requirements. A revision C of the volume 4 dedicated to power generation plant is being completed. It includes responses to vendors comments and feedback from the TVO call for bid for Finland 5. A revision D of the volumes 1 and 2 dedicated to nuclear islands is foreseen. The main contributions to this revision are the harmonization actions going on in Europe about nuclear safety (WENRA study on reactor safety harmonization, EC works, evolution of the IAEA guides and requirements), the harmonization works on the conditions of connection to the European HV grid as well as harmonization works on other matters, like codes and standards. This has given a unified frame in which the future nuclear plants can be designed and built. In this frame development of standards designs usable throughout Europe without major design change is possible, thus helping to increase competition, and ultimately to save investment and operating costs

  20. Overlapping Nuclear Safety Control Provisions of the Atomic Energy Act and Electric Utility Act

    International Nuclear Information System (INIS)

    Chang, Gun-Hyun; Kim, Sang-Won; Koh, Jae-Dong; Ahn, Hyung-Joon; Kim, Chang-Bum

    2007-01-01

    Before May 17, 2005, Korea's nuclear power plant (hereinafter referred to as 'NNP') regulation system was two-pronged. Every NPP system consists of primary or secondary system, and each type was respectively regulated by the Atomic Energy Act(hereinafter referred to as 'AEA') and the Electric Utility Act(hereinafter referred to as 'EUA'). This unusual regulatory regime gave rise to a number of problems with respect to operation and safety. For this reason, the Enforcement Regulation of AEA and applicable Notice were revised on May 17, 2005 to the effect that all regulation on NPPs subject to EUA was brought under the purview of AEA, except regulation on business license for nuclear power generation under Article 7 of EUA and approval of plan of works for setting up electric installations (hereinafter referred to as 'construction plan') (including approval of any changes; the same shall apply hereinafter) under Article 61 thereof. From the point of view of the Ministry of Science and Technology, the regulation of NPPs by a single law has enhanced their safety. However, the Ministry of Commerce, Industry and Energy retains regulatory authority regarding NPPs. It reviews and approves construction plans for secondary system pursuant to Article 61 of EUA and Article 28 of the Enforcement Regulation thereof. This situation arose because Article 28 of the Enforcement Regulation of EUA continues to provide for matters related with nuclear power. Therefore, continued control of NPPs under EUA ignores the relationship and respective nature of AEA and EUA. There is also possibility of violation of a superseding law. Even if said provision is not in violation of a superseding law, Article 28 of the Enforcement Regulation of EUA poses the possibility of overlapping regulation, which may violate the principle of prohibiting excessive regulation, one of the principles of the Korean Constitution. Assessment of the dual regulatory system for review of secondary system requires (i