WorldWideScience

Sample records for electric power transmission facilities

  1. Outline of electric power facility plan in fiscal year 1988

    International Nuclear Information System (INIS)

    1988-01-01

    As to the electric power facility plan in fiscal year 1988, 15 designated electric power enterprises made the notification to the Minister of International Trade and Industry in March, 1988. This outline of the facility plan summarized the plans of 66 enterprises in total, including the plans of municipally operated, joint thermal power and other enterprises in addition to the above 15. In order to ensure the stable supply of electric power, the Ministry of International Trade and Industry considers that it is indispensable to purposefully develop electric power sources and the facilities for distribution along this facility plan. The forecast for fiscal year 1997 is : total electric power demand 778.2 billion kWh, maximum power demand 151.21 million kW, and yearly load factor 56.9 %. This is equivalent to the yearly growth of 2.4 %. In fiscal year 1988, it is planned to present 29 plants of 2760 MW to the Power Source Development Coordination Council. The breakdown is : hydroelectricity 140 MW, thermal power 2010 MW, and nuclear power 610 MW. The Ministry guides electric power enterprises so as to realize the diversification of electric power sources. Also the increase of transmission and transformation facilities, the plan of equipment investment and others are reported. (Kako, I.)

  2. Electric Power Transmission Lines

    Data.gov (United States)

    Department of Homeland Security — Transmission Lines are the system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power...

  3. The electric power engineering handbook electric power generation, transmission, and distribution

    CERN Document Server

    Grigsby, Leonard L

    2012-01-01

    Featuring contributions from worldwide leaders in the field, the carefully crafted Electric Power Generation, Transmission, and Distribution, Third Edition (part of the five-volume set, The Electric Power Engineering Handbook) provides convenient access to detailed information on a diverse array of power engineering topics. Updates to nearly every chapter keep this book at the forefront of developments in modern power systems, reflecting international standards, practices, and technologies. Topics covered include: * Electric Power Generation: Nonconventional Methods * Electric Power Generation

  4. Environmental concerns regarding electric power transmission in North America

    International Nuclear Information System (INIS)

    DeCicco, J.M.; Bernow, S.S.; Beyea, J.

    1992-01-01

    The electric utilities of North America have become ever more interconnected via transmission facilities, largely to insure reliability. Current policy discussions regarding transmission include calls for improved access, increased capacity, and deregulation to facilitate trade in electric power. From an environmental perspective, two issues have been notably absent in much of the debate: (1) a recognition of the full range of environmental impacts related to electricity transmission; and (2) the potential for end-use efficiency to address the reliability and economy requirements that motivate attention to transmission. This paper broaches these issues, starting with an elaboration of the environmental impacts, which range from global and regional effects to local concerns, including the potential health risks associated with electric and magnetic fields. We emphasize that transmission planning should occur as part of an integrated planning process, in which the environmental and social costs of various options are fully considered. We discuss the potential for end-use efficiency to lessen environmental impacts of both transmission and generation. We conclude that there is a need to ensure that environmental externalities and demand-side alternatives are adequately considered when transmission network expansions are proposed. (Author)

  5. Power Electronics and Electric Machines Facilities | Transportation

    Science.gov (United States)

    Research | NREL Facilities Power Electronics and Electric Machines Facilities NREL's power electronics and electric machines thermal management experimentation facilities feature a wide range of four researchers in discussion around a piece of laboratory equipment. Power electronics researchers

  6. Wildlife and electric power transmission

    Science.gov (United States)

    Ellis, D.H.; Goodwin, J.G.; Hunt, J.R.; Fletcher, John L.; Busnel, R.G.

    1978-01-01

    Hundreds of thousands of miles of transmission lines have been introduced into our natural environment. These lines and their corridors can be damaging or beneficial to wildlife communities depending on how they are designed, where they are placed, and when they are constructed and maintained. With the current trend toward UHV systems, new problems (associated with additional increments in audible noise, electric and magnetic force fields, etc.) must be addressed. We recommend the following areas for careful study: (1) the response of wilderness species to transmission lines and line construction and maintenance activities (2) the magnitude of bird collision and electrocution mortality, (3) the response of power corridor and power tower in habiting wildlife to laboratory and field doses of electro-chemical oxidants, corona noise, electric and magnetic fields, etc., (4) the productivity of tower inhabiting birds compared with nearby non-tower nesters, and (5) the influence of powerline corridors on mammalian and avian migration patterns. It is our hope that the questions identified in this study will help stimulate further research so that we can maximize wildlife benefits and minimize wildlife detriments.

  7. Effective use of electric power facilities and promotion of energy conservation

    International Nuclear Information System (INIS)

    Tokumitsu, Iwao

    1999-01-01

    The capacity of Japan's commercial electric power facilities has been increased to more than 200 million kw. In order to provide a stable supply of electric power to meet constantly fluctuaring electric power demands, Japan's power plants generate electricity using an optimal combination of facilities, with nuclear power and coal-fired thermoelectric power providing the base load supply. In the use of electric power, moreover, measures are being implemented to reduce generation costs, conserve energy, and cut carbon dioxide emissions by reducing maximum output and equalizing the load. This report presents information concerning measures for improving the efficiency of electric power facilities operation, equalizing the load and promoting energy conservation. (author)

  8. Wireless electricity (Power) transmission using solar based power satellite technology

    International Nuclear Information System (INIS)

    Maqsood, M; Nasir, M Nauman

    2013-01-01

    In the near future due to extensive use of energy, limited supply of resources and the pollution in environment from present resources e.g. (wood, coal, fossil fuel) etc, alternative sources of energy and new ways to generate energy which are efficient, cost effective and produce minimum losses are of great concern. Wireless electricity (Power) transmission (WET) has become a focal point as research point of view and nowadays lies at top 10 future hot burning technologies that are under research these days. In this paper, we present the concept of transmitting power wirelessly to reduce transmission and distribution losses. The wired distribution losses are 70 – 75% efficient. We cannot imagine the world without electric power which is efficient, cost effective and produce minimum losses is of great concern. This paper tells us the benefits of using WET technology specially by using Solar based Power satellites (SBPS) and also focuses that how we make electric system cost effective, optimized and well organized. Moreover, attempts are made to highlight future issues so as to index some emerging solutions.

  9. Wireless (Power Transfer Transmission of Electrical Energy (Electricity Intended for Consumer Purposes up to 50 W

    Directory of Open Access Journals (Sweden)

    Marek Piri

    2016-01-01

    Full Text Available This project deals with Power Semiconductor Systems PSS for wireless transmission of electricity to the power of 50~W with regard to the distance and transmission efficiency. We decided to use electromagnetic resonance for electrical energy transmission. For experimental verification, we have wound two coils of identical dimensions. At a given power transmission solutions, we obtain the highest efficiency η = 70% at a distance of 5 cm, where the transmitted power was 48 W.

  10. Electric power transmission pricing regulations and efficiency

    International Nuclear Information System (INIS)

    Goldoni, G.

    1999-01-01

    An efficient-price mechanism for electricity transmission is very hard to find, essentially because of the natural monopoly condition of the grid and its peculiar interactions with generation. The use of Optimal Power Flow Models is difficult to implement and could be easily distorted by strategical behaviour of generators. These models, however, could became a valuable efficiency-test for actual transmission charges and codes [it

  11. Investigation on Transmission and Substation Facilities of Sichuan Power Grid in Wenchuan Earthquake

    Institute of Scientific and Technical Information of China (English)

    Yu Yongqing; Li Guangfan; Li Peng; Zhu Quanjun; Yuan Dalu; Wang Chengyu; Li Jinzhong; Huang Huang; Li Lixin; Zhang Xinghai; Liu Jingmin

    2009-01-01

    @@ On May 12,2008,an earthquake of Ms 8.0 hit the area around Wenchuan County,Sichuan Province,China.It has been one of the most destructive earthquakes since the founding of P.R.China in 1949.The quake caused not only tremendous loss of life and wealth,but also severe damage to transmission and substation facilities.After the disaster,an expert group from China Electric Power Research Institute (CEPRI)was sent for on-site investigation.This paper is a summary of the investigation,in which suggestions for electric equipment to resist earthquake disasters are also proponed.

  12. Electricity transmission and distribution in Ontario : a look ahead

    International Nuclear Information System (INIS)

    2004-01-01

    This paper addressed changes and challenges that can guide the Ontario government in developing a policy framework for sustainable development in the electric power industry, particularly the power distribution and transmission sector. The government is taking action to adopt a balanced approach to energy policy that combines features of both regulated and competitive industries. It is taking a more responsible approach to electricity pricing that ends subsidies in order to reflect the true cost of electricity. The major issues facing the wires sector are: improving efficiencies by consolidating activities, streamlining operations and unbundling power transmission and distribution into separate entities; developing distributed generation; and, investing in new transmission to relieve congestion. It was noted that distributed generation will become more important as coal-fired generation facilities are replaced. Distributed generation offers many benefits for the wires sector, including delaying the need to upgrade the existing wires network, offering local solutions to transmission constraints, reducing system losses, improving load factor and improving the reliability of supply. An increase in distributed generation will likely mean that more of Ontario's electricity supply will come from small-scale renewable generation facilities. The government promotes private sector investment to assist in the rebuilding of the electricity sector

  13. On-site electric power source facility for Japanese nuclear power plant

    International Nuclear Information System (INIS)

    Oohara, T.

    1986-01-01

    Trends of construction of nuclear power plants in Japan, occurrence rate of incidents/failures of electric facilities, major example of incidents/failures, their countermeasure to prevent recurrence are introduced. Furthermore, safety administration system of the Government, electric utilities and manufacturers, and various countermeasures to prevent incident/ failure of electrical facilities from the hardware and software sides are discussed. (author)

  14. On-site electric power source facility for Japanese nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Oohara, T. [Incident/Failure Analysis and Evaluation Office, Nuclear Power Safety Information Research Centre, Nuclear Power Engineering Test Centre, 2nd Floor, Shuwa-Kamiyacho Bldg., 3-13, 4-Chome, Toranomon Minato-ku, Tokyo 105 (Japan)

    1986-02-15

    Trends of construction of nuclear power plants in Japan, occurrence rate of incidents/failures of electric facilities, major example of incidents/failures, their countermeasure to prevent recurrence are introduced. Furthermore, safety administration system of the Government, electric utilities and manufacturers, and various countermeasures to prevent incident/ failure of electrical facilities from the hardware and software sides are discussed. (author)

  15. Application of essential facility doctrine to transmission grid; Sodenmo eno essential facility no hori no tekiyo

    Energy Technology Data Exchange (ETDEWEB)

    Maruyama, M. [Central Research Institute of Electric Power Industry, Tokyo (Japan)

    1997-06-01

    This paper arranges the essential facility doctrine in America and describes it according to each judgment example how the doctrine is applied on the access of electricity supply companies to transmission grids. By applying the result to the situation of Japan, the point at issue occurring in the range of the Anti-Monopoly Law was arranged and investigated when third parties (power generating manufacturers) access the transmission grids of electricity supply companies in the form of wholesale or self transmission in the electricity supply industry of Japan. In the judgment example of America, a transmission grid can be considered as essential facility. The refusal of essential facility application is judged to be illegal only when it aims at keeping and expanding the leading market share without a fair reason. The application of essential facility can be refused when the transmission line is insufficient in capacity, when no necessary technical conditions are satisfied during use, or when the cost generated during use cannot be collected. 18 refs., 7 figs., 2 tabs.

  16. The effect of electric transmission constraints on how power generation companies bid in the Colombian electrical power market

    Directory of Open Access Journals (Sweden)

    Luis Eduardo Gallego Vega

    2010-05-01

    Full Text Available This paper presents the results of research about the effect of transmission constraints on both expected electrical energy to be dispatched and power generation companies’ bidding strategies in the Colombian electrical power market. The proposed model simulates the national transmission grid and economic dispatch by means of optimal power flows. The proposed methodology allows structural problems in the power market to be analyzed due to the exclusive effect of trans- mission constraints and the mixed effect of bidding strategies and transmission networks. A new set of variables is proposed for quantifying the impact of each generation company on system operating costs and the change in expected dispatched energy. A correlation analysis of these new variables is presented, revealing some interesting linearities in some generation companies’ bidding patterns.

  17. Transmission rights and market power on electric power networks. 2. Physical rights

    International Nuclear Information System (INIS)

    Joskow, Paul; Tirole, Jean

    1999-01-01

    This discussion paper examines physical transmission rights where the capacity of each potentially congested interface is defined and the rights to use the congested interfaces are created and allocated in some way for suppliers and consumers. The way in which the allocation of physical rights affects competition or increases the buyers or sellers market power in the power generation market when a transmission interface is congested, and how rights markets with different microstructures allocate physical rights and determine rights prices are explored. An electricity market with physical transmission rights in the absence of capacity release rules, and physical transmission rights and market power are addressed. Loop flows, and capacity release rules are discussed. (UK)

  18. Short-term electric power demand forecasting based on economic-electricity transmission model

    Science.gov (United States)

    Li, Wenfeng; Bai, Hongkun; Liu, Wei; Liu, Yongmin; Wang, Yubin Mao; Wang, Jiangbo; He, Dandan

    2018-04-01

    Short-term electricity demand forecasting is the basic work to ensure safe operation of the power system. In this paper, a practical economic electricity transmission model (EETM) is built. With the intelligent adaptive modeling capabilities of Prognoz Platform 7.2, the econometric model consists of three industrial added value and income levels is firstly built, the electricity demand transmission model is also built. By multiple regression, moving averages and seasonal decomposition, the problem of multiple correlations between variables is effectively overcome in EETM. The validity of EETM is proved by comparison with the actual value of Henan Province. Finally, EETM model is used to forecast the electricity consumption of the 1-4 quarter of 2018.

  19. Electric transmission technology

    International Nuclear Information System (INIS)

    Shah, K.R.

    1990-01-01

    Electric transmission technology has matured and can transmit bulk power more reliably and economically than the technology 10 years ago.In 1882, Marcel Depres transmitted 15 kW electric power at 2 kV, using a constant direct current; present transmission voltages have risen to ± 600 kV direct current (DC) and 765 kV alternating current (AC), and it is now possible to transmit bulk electric power at voltages as high as ± 1000 kV DC and 1500 kV AC. Affordable computer systems are now available to optimize transmission reliably. New materials have reduced the bulk of insulation for lines and equipment. New conducting materials and configurations have reduced losses in transmission. Advances in line structures and conductor motion, understanding of flashover characteristics of insulators and air-gaps and electrical performance of lines have resulted in more compact urban transmission lines. (author). 15 refs., 7 tabs., 11 figs

  20. Lewis Research Center space station electric power system test facilities

    Science.gov (United States)

    Birchenough, Arthur G.; Martin, Donald F.

    1988-01-01

    NASA Lewis Research Center facilities were developed to support testing of the Space Station Electric Power System. The capabilities and plans for these facilities are described. The three facilities which are required in the Phase C/D testing, the Power Systems Facility, the Space Power Facility, and the EPS Simulation Lab, are described in detail. The responsibilities of NASA Lewis and outside groups in conducting tests are also discussed.

  1. A literature survey on asset management in electrical power [transmission and distribution] system

    OpenAIRE

    Khuntia, S.R.; Rueda Torres, José L.; Bouwman, S.; van der Meijden, M.A.M.M.

    2016-01-01

    Asset management is one of the key components in a transforming electric power industry. Electric power industry is undergoing significant changes because of technical, socio-economical and environmental developments. Also, because of restructuring and deregulation, the focus has been on transmission and distribution assets that include transmission lines, power transformers, protection devices, substation equipment and support structures. This study aims to provide a detailed exposure to ass...

  2. Transmission cost minimization strategies for wind-electric generating facilities

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez, R. [Northern States Power Company, Minneapolis, MN (United States)

    1997-12-31

    Integrating wind-electric generation facilities into existing power systems presents opportunities not encountered in conventional energy projects. Minimizing outlet cost requires probabilistic value-based analyses appropriately reflecting the wind facility`s operational characteristics. The wind resource`s intermittent nature permits relaxation of deterministic criteria addressing outlet configuration and capacity required relative to facility rating. Equivalent capacity ratings of wind generation facilities being a fraction of installed nameplate rating, outlet design studies contingency analyses can concentrate on this fractional value. Further, given its non-dispatchable, low capacity factor nature, a lower level of redundancy in outlet facilities is appropriate considering the trifling contribution to output unreliability. Further cost reduction opportunities arise from {open_quotes}wind speed/generator power output{close_quotes} and {open_quotes}wind speed/overhead conductor rating{close_quotes} functions` correlation. Proper analysis permits the correlation`s exploitation to safely increase line ratings. Lastly, poor correlation between output and utility load may permit use of smaller conductors, whose higher (mostly off-peak) losses are economically justifiable.

  3. Research on adoption of graphic processing system into electric power facilities operation management. Denryoku setsubi kanri gyomu ni okeru zukei shori system no tekiyo ni kansuru kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Jitsubuchi, Yoshiyasu; Uryu, Kenji; Terasaki, Naoaki (Kyushu Electric Power Co., Inc., Fukuoka (Japan))

    1989-03-30

    In the technical department of electric power companies, there are innumerable single line diagram, machinery arrangement plan and other facilities drawings. Based on those drawings, facilities planning, work design, construction plan, maintenance and management data, etc. are made, for which making heightening is desired in efficiency of drawing filing management. Therefore, research was made on the adoption of CAD technology through modeling power transmission line, and power generating and transforming station operation management. First for the application of power transmission facilities, the power transmission line plan and facilities information were planned to be unified in management. Ie., the power transmission line plan and profile being shown on the display, symbols of steel towers, cable lines, etc. were further picked by mouth to easily substantiate the facilities. While image input and CAD of drawing were made in combined treatment. Then for the application to the power generating and transforming facilities, the single line diagram and facilities information were unified in management, together with demonstration of data interchangeability among different kinds of CAD system. 13 figs., 9 tabs.

  4. 76 FR 20651 - Application To Export Electric Energy; Cargill Power Markets, LLC

    Science.gov (United States)

    2011-04-13

    ... application. SUMMARY: Cargill Power Markets, LLC (CPM) has applied for authority to transmit electric energy... the FPA (16 U.S.C. 824a(e)). On March 22, 2011, DOE received an application from CPM for authority to... international transmission facilities. CPM does not own any electric transmission facilities nor does it hold a...

  5. Transmission pricing and stranded costs in the electric power industry

    International Nuclear Information System (INIS)

    Baumol, W.J.; Sidak, J.G.

    1995-09-01

    Stranded costs are those costs that electric utilities are currently permitted to recover through their rates but whose recovery may be impeded or prevented by the advent of competition in the industry. Estimates of these costs run from the tens to the hundreds of billions of dollars. Should regulators permit utilities to recover stranded costs while they take steps to promote competition in the electric power industry. William Baumol and J. Gregory Sidak argue that answer to that question should be yes.The authors show that a transmission price, the price for sending electricity over the transmission grid, can be determined in a manner that is compatible with economic efficiency and clearly neutral in its effects upon all competitors in electricity generation. A correctly constructed regime of transmission pricing may in fact achieve the efficiency and equity goals that justify the recovery of stranded costs

  6. Operation reliability analysis of independent power plants of gas-transmission system distant production facilities

    Science.gov (United States)

    Piskunov, Maksim V.; Voytkov, Ivan S.; Vysokomornaya, Olga V.; Vysokomorny, Vladimir S.

    2015-01-01

    The new approach was developed to analyze the failure causes in operation of linear facilities independent power supply sources (mini-CHP-plants) of gas-transmission system in Eastern part of Russia. Triggering conditions of ceiling operation substance temperature at condenser output were determined with mathematical simulation use of unsteady heat and mass transfer processes in condenser of mini-CHP-plants. Under these conditions the failure probability in operation of independent power supply sources is increased. Influence of environmental factors (in particular, ambient temperature) as well as output electric capability values of power plant on mini-CHP-plant operation reliability was analyzed. Values of mean time to failure and power plant failure density during operation in different regions of Eastern Siberia and Far East of Russia were received with use of numerical simulation results of heat and mass transfer processes at operation substance condensation.

  7. Incorporating energy efficiency into electric power transmission planning: A western United States case study

    International Nuclear Information System (INIS)

    Barbose, Galen L.; Sanstad, Alan H.; Goldman, Charles A.

    2014-01-01

    Driven by system reliability goals and the need to integrate significantly increased renewable power generation, long-range, bulk-power transmission planning processes in the United States are undergoing major changes. At the same time, energy efficiency is an increasing share of the electricity resource mix in many regions, and has become a centerpiece of many utility resource plans and state policies as a means of meeting electricity demand, complementing supply-side sources, and reducing carbon dioxide emissions from the electric power system. The paper describes an innovative project in the western United States to explicitly incorporate end-use efficiency into load forecasts – projections of electricity consumption and demand – that are a critical input into transmission planning and transmission planning studies. Institutional and regulatory background and context are reviewed, along with a detailed discussion of data sources and analytical procedures used to integrate efficiency into load forecasts. The analysis is intended as a practical example to illustrate the kinds of technical and institutional issues that must be addressed in order to incorporate energy efficiency into regional transmission planning activities. - Highlights: • Incorporating energy efficiency into electric power transmission planning is an emergent analytical and policy priority. • A new methodology for this purpose was developed and applied in the western U.S. transmission system. • Efficiency scenarios were created and incorporated into multiple load forecasts. • Aggressive deployment of efficiency policies and programs can significantly reduce projected load. • The approach is broadly applicable in long-range transmission planning

  8. Design requirements document for the phase 1 privatization electrical power system

    Energy Technology Data Exchange (ETDEWEB)

    Singh, G.

    1997-10-31

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract.

  9. Design requirements document for the phase 1 privatization electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract

  10. Medium-term electric power demand forecasting based on economic-electricity transmission model

    Science.gov (United States)

    Li, Wenfeng; Bao, Fangmin; Bai, Hongkun; Liu, Wei; Liu, Yongmin; Mao, Yubin; Wang, Jiangbo; Liu, Junhui

    2018-06-01

    Electric demand forecasting is a basic work to ensure the safe operation of power system. Based on the theories of experimental economics and econometrics, this paper introduces Prognoz Platform 7.2 intelligent adaptive modeling platform, and constructs the economic electricity transmission model that considers the economic development scenarios and the dynamic adjustment of industrial structure to predict the region's annual electricity demand, and the accurate prediction of the whole society's electricity consumption is realized. Firstly, based on the theories of experimental economics and econometrics, this dissertation attempts to find the economic indicator variables that drive the most economical growth of electricity consumption and availability, and build an annual regional macroeconomic forecast model that takes into account the dynamic adjustment of industrial structure. Secondly, it innovatively put forward the economic electricity directed conduction theory and constructed the economic power transfer function to realize the group forecast of the primary industry + rural residents living electricity consumption, urban residents living electricity, the second industry electricity consumption, the tertiary industry electricity consumption; By comparing with the actual value of economy and electricity in Henan province in 2016, the validity of EETM model is proved, and the electricity consumption of the whole province from 2017 to 2018 is predicted finally.

  11. Improvement of the electric power sector through the access to the national power transmission system - SINTREL (Brazilian National System of Electric Power Transmission); Aperfeicoamento do setor de energia eletrica atraves do acesso a transmissao - SINTREL (Sistema Nacional de Transmissao de Energia Eletrica)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-01

    This report presents the organization and the operation of SINTREL (Brazilian National System of Electric Power Transmission), the national power transmission system, and it defines its function in the process of reform of the Brazilian electric sector. Besides showing the traditional organization of the companies and of the electric system, and the evolution of the organization of the Brazilian electric system to favor the competition.

  12. Mortality of persons resident in the vicinity of electricity transmission facilities

    Energy Technology Data Exchange (ETDEWEB)

    McDowall, M E

    1986-02-01

    Several studies have raised the possibility that exposure to electrical and/or magnetic fields may be injurious to health in particular by the promotion or initiation of cancer. To investigate whether the electricity transmission system presents a long term hazard to public health, the mortality of nearly 8,000 persons, identified as living in the vicinity of electrical transmission facilities at the time of the 1971 Population Census, has been followed to the end of 1983. All identified transmission installations within pre-defined areas were included in the study with the result that the greater part of the study group were believed to be resident near relatively low voltage sub-stations. Overall mortality was lower than expected and no evidence of major health hazards emerged. The only statistically significant excess mortality was for lung cancer (in women overall, and in persons living closest to the installations); this result is difficult to interpret in the absence of smoking data, and is not supported by other evidence but does not appear to be due to the social class distribution of the study group. The study did not support previously reported associations of exposure to electro-magnetic fields with acute myeloid leukaemia, other lymphatic cancers and suicide.

  13. ELECTRODYNAMICS OF TRANSMISSION AND LOSSES OF POWER IN THE DEVICES OF ELECTRIC TRACTION SYSTEMS

    Directory of Open Access Journals (Sweden)

    M. O. Kostin

    2014-01-01

    Full Text Available Purpose. Theoretical justification of the "field" approach (based on electromagnetic field to the transmission and losses of power in the devices of traction power supply systems and electric rolling stock. Methodology. The methods of electromagnetic field theory and, in particular, the theory and practice of electromagnetic energy transmission based on the concept of the Poynting vector and elements of the theory of propagation, reflection and refraction of plane electromagnetic waves were used. Findings. Theoretical studies of electromagnetic energy transmission from the traction substation to the electric rolling stock through dielectric (air surrounding traction network: between the contact wire and the rail were carried out. It is proposed strategic designing "squat" (low types of electric rolling stock. The components of electric energy flow through the roof of electric rolling stock and its frontal part of the body were estimated. This allows reliable etimating active power losses in electric traction system. To compensate the reactive power consumed by electric rolling stock, which is conditioned by standing waves, it is proposed (for extinction of the the last to develop and put in front of electric rolling stock the layer of particular environment with the necessary parameters. Originality. The "field" principle of the power transmission analysis and its losses arising in electric traction system was first proposed. The laws of motion of electromagnetic energy flows through the roof and the frontal part of the body of electric rolling stock were established. Practical value. An expression of the absolute value of the Poynting vector in the points of dielectric (air between the contact wire and the rail was obtained. This allows assessing the highest density of energy, which is transferred to the time unit and predicting the main dimensions of the unit of electric rolling stock. The energy indices of the roof of electric rolling stock

  14. Design and Implementation of an over Current Protection Laboratory for Electrical Power Transmission Systems Based on PLC Techniques

    Directory of Open Access Journals (Sweden)

    Hassaan Th. H. Thabet

    2018-01-01

    Full Text Available This paper describes a modern approach for the protection of transmission lines to ensure theirsafety against the faults occurred in power systems. Our approach uses a Programmable LogicController (PLC to realize a transmission line as an over current protection relay. A conditioningcircuit was designed, implemented and tested to collect data obtained from Hall Effect sensors which convert them to suitable analog values compatible with PLC's inputs. Results obtained by our PLC control system are very similar to those obtained by the conventional relays but more efficient. An Automatic Reclosing System (ARS for remote faults is also included in this approach. Our PLC control system and its algorithm are illustrated in this paper also. This approach is designed to be used in electrical networks laboratories as an educational unit in electrical departments of engineering collages and technical institutes; it can be used also in real power systems through suitable interfacing facilities.

  15. Transmission cost allocation based on power flow tracing considering reliability benefit

    International Nuclear Information System (INIS)

    Leepreechanon, N.; Singharerg, S.; Padungwech, W.; Nakawiro, W.; Eua-Arporn, B.; David, A.K.

    2007-01-01

    Power transmission networks must be able to accommodate the continuously growing demand for reliable and economical electricity. This paper presented a method to allocate transmission use and reliability cost to both generators and end-consumers. Although transmission cost allocation methods change depending on the local context of the electric power industry, there is a common principle that transmission line capacity should be properly allocated to accommodate actual power delivery with an adequate reliability margin. The method proposed in this paper allocates transmission embedded cost to both generators and loads in an equitable manner, incorporating probability indices to allocate transmission reliability margin among users in both supply and demand sides. The application of the proposed method was illustrated using Bialek's tracing method on a multiple-circuit, six-bus transmission system. Probabilistic indices known as the transmission internal reliability margin (TIRM) and transmission external reliability margin (TERM) decomposed from the transmission reliability margin (TRM) were introduced, making true cost of using overall transmission facilities. 6 refs., 11 tabs., 5 figs

  16. Consumption, price asymmetries, transmission congestion and market power in the Norwegian electricity market

    Energy Technology Data Exchange (ETDEWEB)

    Mirza, Faisal Mehmood

    2011-07-01

    The results from this dissertation add to the ongoing debate in Norway if NordPool spot should shift from zonal price scheme to the nodal price scheme. Academically, the individual papers provide a number of theoretical frameworks that are helpful in analyzing electricity markets around the world. The PhD dissertation investigates price determination process in the Norwegian electricity market and evaluates if the market works at perfectly competitive level or producers exercise market power to drive prices away from their marginal cost of production. Using aggregate hourly electricity supply and demand data, the empirical analysis carried out in this dissertation leads to the following conclusions. 1. Market power at the generation level is not a major problem for the Norwegian electricity market. On average, when we consider the events of binding transmission capacity as exogenous, the average markup in economic terms is small and has not exceeded one percent. 2. Producers can use the information on available transmission capacity between different price areas in Norway and restrict their output to induce transmission congestion in their price area to exercise market power. Average markup during such instances has remained high at 20 percent. 3. Transmission capacity in Norway is not being optimally utilized as import capacity remains at its lowest level during the hours when southern Norway is generally a net importer of electricity, when compared to the rest of the hours of the day. 4. A segment of electricity retailers in the Norwegian electricity market exercises its market power by controlling the pass-through of price changes in the wholesale market to the retail market for variable price contract consumers. The pass-through is asymmetric, whereby cost increase is transmitted completely and quickly when compared to the case of cost decrease. 5.The Daylight saving time (Summer time) policy is helpful in ensuring energy efficiency. It results in electricity

  17. Proximity effects of high voltage electric power transmission lines on ...

    African Journals Online (AJOL)

    The proximity effects of high voltage electric power transmission lines on Leyland Cypress (xCupressocyparis leylandii (Dallim. and A.B. Jacks.) Dallim) and Japanese Privet (Ligustrum japonicum Thunb.) growth were examined in a private nursery located in Sakarya, Turkey. Five transect were randomly chosen in both ...

  18. Power transmission cable development for the Space Station Freedom electrical power system

    Science.gov (United States)

    Schmitz, Gregory V.; Biess, John J.

    1989-01-01

    Power transmission cable is presently being evaluated under a NASA Lewis Research Center advanced development contract for application in the Space Station Freedom (SSF) electrical power system (EPS). Evaluation testing has been performed by TRW and NASA Lewis Research Center. The results of this development contract are presented. The primary cable design goals are to provide (1) a low characteristic inductance to minimize line voltage drop at 20 kHz, (2) electromagnetic compatibility control of the 20-kHz ac power current, (3) a physical configuration that minimizes ac resistance and (4) release of trapped air for corona-free operation.

  19. High power RF transmission line component development

    International Nuclear Information System (INIS)

    Hong, B. G.; Hwang, C. K.; Bae, Y. D.; Yoon, J. S.; Wang, S. J.; Gu, S. H.; Yang, J. R.; Hahm, Y. S.; Oh, G. S.; Lee, J. R.; Lee, W. I.; Park, S. H.; Kang, M. S.; Oh, S. H.; Lee, W.I.

    1999-12-01

    We developed the liquid stub and phase shifter which are the key high RF power transmission line components. They show reliable operation characteristics and increased insulation capability, and reduced the size by using liquid (silicon oil, dielectric constant ε=2.72) instead of gas for insulating dielectric material. They do not have finger stock for the electric contact so the local temperature rise due to irregular contact and RF breakdown due to scratch in conductor are prevented. They can be utilized in broadcasting, radar facility which require high RF power transmission. Moreover, they are key components in RF heating system for fusion reactor. (author)

  20. High power RF transmission line component development

    Energy Technology Data Exchange (ETDEWEB)

    Hong, B. G.; Hwang, C. K.; Bae, Y. D.; Yoon, J. S.; Wang, S. J.; Gu, S. H.; Yang, J. R.; Hahm, Y. S.; Oh, G. S.; Lee, J. R.; Lee, W. I.; Park, S. H.; Kang, M. S.; Oh, S. H.; Lee, W.I

    1999-12-01

    We developed the liquid stub and phase shifter which are the key high RF power transmission line components. They show reliable operation characteristics and increased insulation capability, and reduced the size by using liquid (silicon oil, dielectric constant {epsilon}=2.72) instead of gas for insulating dielectric material. They do not have finger stock for the electric contact so the local temperature rise due to irregular contact and RF breakdown due to scratch in conductor are prevented. They can be utilized in broadcasting, radar facility which require high RF power transmission. Moreover, they are key components in RF heating system for fusion reactor. (author)

  1. Economy of electric power transmission

    International Nuclear Information System (INIS)

    Manzoni, G.; Delfanti, M.

    2008-01-01

    An analysis is presented of the impact of H V and Ehv transmission costs on the final value of the kWh supplied, with reference both to transmission systems of the European type and to long distance point-to-point transmission links. The analysis is extended to A C transmission by underground cables and to Hvdc submarine and aerial links. In the European power system, the impact of transmission costs results to be usually modest, but it may become important in the case of network congestions [it

  2. TWRS privatization phase 1 electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    This document includes Conceptual Design Report (CDR) for a new 11 km (7 miles) 230 kV transmission line and a new 40 MVA substation (A6) which will be located east of Grout Facility in 200E Area tank farm. This substation will provide electrical power up to 20 MW each for two private contractor facilities for immobilization and disposal of low activity waste (LAW)

  3. Electrical power systems for Mars

    Science.gov (United States)

    Giudici, Robert J.

    1986-01-01

    Electrical power system options for Mars Manned Modules and Mars Surface Bases were evaluated for both near-term and advanced performance potential. The power system options investigated for the Mission Modules include photovoltaics, solar thermal, nuclear reactor, and isotope power systems. Options discussed for Mars Bases include the above options with the addition of a brief discussion of open loop energy conversion of Mars resources, including utilization of wind, subsurface thermal gradients, and super oxides. Electrical power requirements for Mission Modules were estimated for three basic approaches: as a function of crew size; as a function of electric propulsion; and as a function of transmission of power from an orbiter to the surface of Mars via laser or radio frequency. Mars Base power requirements were assumed to be determined by production facilities that make resources available for follow-on missions leading to the establishment of a permanently manned Base. Requirements include the production of buffer gas and propellant production plants.

  4. Power Consumption Analysis of Electrical Installations at Healthcare Facility

    Directory of Open Access Journals (Sweden)

    Emmanuel Guillen-Garcia

    2017-01-01

    Full Text Available This paper presents a methodology for power consumption estimation considering harmonic and interharmonic content and then it is compared to the power consumption estimation commonly done by commercial equipment based on the fundamental frequency, and how they can underestimate the power consumption considering power quality disturbances (PQD. For this purpose, data of electrical activity at the electrical distribution boards in a healthcare facility is acquired for a long time period with proprietary equipment. An analysis in the acquired current and voltage signals is done, in order to compare the power consumption centered in the fundamental frequency with the generalized definition of power consumption. The results obtained from the comparison in the power consumption estimation show differences between 4% and 10% of underestimated power consumption. Thus, it is demonstrated that the presence of harmonic and interharmonic content provokes a significant underestimation of power consumption using only the power consumption centered at the fundamental frequency.

  5. 47 CFR 74.795 - Digital low power TV and TV translator transmission system facilities.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital low power TV and TV translator... DISTRIBUTIONAL SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.795 Digital low power TV and TV translator transmission system facilities. (a) A digital low power TV or TV translator station shall operate...

  6. Electric power transmission system: A new expansion scheme

    International Nuclear Information System (INIS)

    Unidad de Planeacion Minero Energetica, UPME

    2000-01-01

    With the purpose of responding to the interconnection requirements among the main cities of the country, a company of public character was created, in charge of the planning and of the development of the national interconnected system (NIS), in such form that their work optimized the use of the available energy resources for the electricity supply and it improved the accounting levels and quality of the service. Starting from 1967, interconnection electric Corp., ISA, a very important task began in the development of methodologies and strategies of expansion of the INS that it allowed, in very short term, to connect the areas of Bogota the Atlantic Cost, Antioquia and the Cauca Valley and to develop important generation projects for the supply of electric power of the country. Then, the electric sector was reformed through the laws 142 and 143 of 1994, in search of the specialization of the business and in that sense, ISA is divided in two companies: ISAGEN that the activities degeneration and electric power commercialization, and ISA, company electric power transport, that it takes charge of the interconnection of the national system assumes. In connection with the execution of the transmission works and in the face of the possibility of lingering courts of energy, the law establishes that ISA will carry out the works that are needed and that the particular initiative doesn't develop. For that same time, it is considered that the planning should be carried out in an integral way, taking into account the requirements of the population's energy and its possibilities of supply and through programs and actions of appropriate use of the available energy resources. The UPME (Unit of Planning Miner Energetic) was created for assumes this work, so with their analyses they already offer signs to the state the investors, about the population's necessities and of the business opportunities, respectively

  7. Single-Wire Electric-Field Coupling Power Transmission Using Nonlinear Parity-Time-Symmetric Model with Coupled-Mode Theory

    Directory of Open Access Journals (Sweden)

    Xujian Shu

    2018-03-01

    Full Text Available The output power and transmission efficiency of the traditional single-wire electric-field coupling power transmission (ECPT system will drop sharply with the increase of the distance between transmitter and receiver, thus, in order to solve the above problem, in this paper, a new nonlinear parity-time (PT-symmetric model for single-wire ECPT system based on coupled-mode theory (CMT is proposed. The proposed model for single-wire ECPT system not only achieves constant output power but also obtains a high constant transmission efficiency against variable distance, and the steady-state characteristics of the single-wire ECPT system are analyzed. Based on the theoretical analysis and circuit simulation, it shows that the transmission efficiency with constant output power remains 60% over a transmission distance of approximately 34 m without the need for any tuning. Furthermore, the application of a nonlinear PT-symmetric circuit based on CMT enables robust electric power transfer to moving devices or vehicles.

  8. Electric power industry in China

    Energy Technology Data Exchange (ETDEWEB)

    Zisheng Jiang [Ministry of Electric Power, Beijing (China). Bureau of Electric Power Machinery

    1995-07-01

    This document presents the status of the electric power in China, highlighting the following aspects: recent achievement, electricity increased sharing in the total energy consumption, technical economic indexes, nuclear power, renewable energy sources, rural electrification, transmission and power network, transmission lines and substations, present status and development trends for power network, regulation of power system dispatching, power system communication. The document also presents the future developing plan, approaching the outlook and strategy, development targets of the electric power industry and the administrative system reforming of the electric power industry.

  9. Electrical Structure of Future Off-shore Wind Power Plant with a High Voltage Direct Current Power Transmission

    DEFF Research Database (Denmark)

    Sharma, Ranjan

    The increasing demand of electric power and the growing consciousness towards the changing climate has led to a rapid development of renewable energy in the recent years. Among all, wind energy has been the fastest growing energy source in the last decade. But the growing size of wind power plants......, better wind conditions at off-shore and the general demand to put them out of sight have all contributed to the installation of large wind power plants in off-shore condition. However, moving wind power plants far out in the off-shore comes with many associated problems. One of the main challenges...... is the transmission of power over long distance. Historically, the power transmission from off-shore wind power plants has been done via HVAC submarine cables. This provides a simple solution, but AC cables cannot be arbitrarily long. It is shown in the report that major issues with HVAC cable transmission system...

  10. Price-based optimal control of power flow in electrical energy transmission networks

    NARCIS (Netherlands)

    Jokic, A.; Lazar, M.; Bosch, van den P.P.J.; Bemporad, A.; Bicchi, A.; Buttazzo, G.

    2007-01-01

    This article presents a novel control scheme for achieving optimal power balancing and congestion control in electrical energy transmission networks via nodal prices. We develop an explicit controller that guarantees economically optimal steady-state operation while respecting all line flow

  11. Electric power transmission for a Hanford Nuclear Energy Center (HNEC)

    International Nuclear Information System (INIS)

    Harty, H.; Dowis, W.J.

    1983-06-01

    The original study of transmission for a Hanford Nuclear Energy Center (HNEC), which was completed in September 1975, was updated in June 1978. The present 1983 revision takes cognizance of recent changes in the electric power situation of the PNW with respect to: (1) forecasts of load growth, (2) the feasibility of early use of 1100 kV transmission, and (3) the narrowing opportunities for siting nuclear plants in the region. The purpose of this update is to explore and describe additions to the existing transmission system that would be necessary to accommodate three levels of generation at HNEC. Comparisons with a PNW system having new thermal generating capacity distributed throughout the marketing region are not made as was done in earlier versions

  12. Operational electricity transmission rates

    International Nuclear Information System (INIS)

    Roggen, M.

    1997-01-01

    In a liberalized electricity market both the consumers and the producers of electricity must pay for the use of the power transmission network. Thus, the net manager has unlimited options to realize efficiency improvements. A neutral and transparent management of the power grid is necessary to avoid disturbance of the market. KEMA Consulting translated abstract ideas and strategic advices to operational concepts in its report 'A framework for the determination of tariffs of the transport in the Dutch electricity sector'

  13. Multilayered Functional Insulation System (MFIS) for AC Power Transmission in High Voltage Hybrid Electrical Propulsion

    Science.gov (United States)

    Lizcano, Maricela

    2017-01-01

    High voltage hybrid electric propulsion systems are now pushing new technology development efforts for air transportation. A key challenge in hybrid electric aircraft is safe high voltage distribution and transmission of megawatts of power (>20 MW). For the past two years, a multidisciplinary materials research team at NASA Glenn Research Center has investigated the feasibility of distributing high voltage power on future hybrid electric aircraft. This presentation describes the team's approach to addressing this challenge, significant technical findings, and next steps in GRC's materials research effort for MW power distribution on aircraft.

  14. Calculation and application of energy transaction allocation factors in electric power transmission systems

    Science.gov (United States)

    Fradi, Aniss

    The ability to allocate the active power (MW) loading on transmission lines and transformers, is the basis of the "flow based" transmission allocation system developed by the North American Electric Reliability Council. In such a system, the active power flows must be allocated to each line or transformer in proportion to the active power being transmitted by each transaction imposed on the system. Currently, this is accomplished through the use of the linear Power Transfer Distribution Factors (PTDFs). Unfortunately, no linear allocation models exist for other energy transmission quantities, such as MW and MVAR losses, MVAR and MVA flows, etc. Early allocation schemes were developed to allocate MW losses due to transactions to branches in a transmission system, however they exhibited diminished accuracy, since most of them are based on linear power flow modeling of the transmission system. This thesis presents a new methodology to calculate Energy Transaction Allocation factors (ETA factors, or eta factors), using the well-known process of integration of a first derivative function, as well as consistent and well-established mathematical and AC power flow models. The factors give a highly accurate allocation of any non-linear system quantity to transactions placed on the transmission system. The thesis also extends the new ETA factors calculation procedure to restructure a new economic dispatch scheme where multiple sets of generators are economically dispatched to meet their corresponding load and their share of the losses.

  15. 1KW Power Transmission Using Wireless Acoustic-Electric Feed-Through (WAEF)

    Science.gov (United States)

    Sherrit, S.; Bao, X.; Badescu, M.; Aldrich, J.; Bar-Cohen, Y.; Biederman, W.

    2008-01-01

    A variety of space applications require the delivery of power into sealed structures. Since the structural integrity can be degraded by holes for cabling we present an alternative method of delivering power and information using stress waves to the internal space of a sealed structure. One particular application of this technology is in sample return missions where it is critical to preserve the sample integrity and to prevent earth contamination. Therefore, the container has to be hermetically sealed and the integrity of the seal must be monitored in order to insure to a high degree of reliability the integrity of the sample return vessel. In this study we investigated the use of piezoelectric acoustic-electric power feed-through devices to transfer electric power wirelessly through a solid wall by using elastic or acoustic waves. The technology is applicable to a range of space and terrestrial applications where power is required by electronic equipment inside sealed containers, vacuum or pressure vessels, etc., where holes in the wall are prohibitive or may result in significant structural performance degradation or unnecessarily complex designs. To meet requirements of higher power applications, the feasibility to transfer kilowatts level power was investigated. Pre-stressed longitudinal piezoelectric feed-through devices were analyzed by finite element models and an equivalent circuit model was developed to predict the power transfer characteristics to different electric loads. Based on the results of the analysis a prototype device was designed, fabricated and a demonstration of the transmission of electric power up to 1.068-kW was successfully conducted. Efficiencies in the 80-90% range were also demonstrated and methods to increase the efficiency further are currently being considered.

  16. Interface Control Document for the EMPACT Module that Estimates Electric Power Transmission System Response to EMP-Caused Damage

    Energy Technology Data Exchange (ETDEWEB)

    Werley, Kenneth Alan [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Mccown, Andrew William [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)ory

    2016-06-26

    The EPREP code is designed to evaluate the effects of an Electro-Magnetic Pulse (EMP) on the electric power transmission system. The EPREP code embodies an umbrella framework that allows a user to set up analysis conditions and to examine analysis results. The code links to three major physics/engineering modules. The first module describes the EM wave in space and time. The second module evaluates the damage caused by the wave on specific electric power (EP) transmission system components. The third module evaluates the consequence of the damaged network on its (reduced) ability to provide electric power to meet demand. This third module is the focus of the present paper. The EMPACT code serves as the third module. The EMPACT name denotes EMP effects on Alternating Current Transmission systems. The EMPACT algorithms compute electric power transmission network flow solutions under severely damaged network conditions. Initial solutions are often characterized by unacceptible network conditions including line overloads and bad voltages. The EMPACT code contains algorithms to adjust optimally network parameters to eliminate network problems while minimizing outages. System adjustments include automatically adjusting control equipment (generator V control, variable transformers, and variable shunts), as well as non-automatic control of generator power settings and minimal load shedding. The goal is to evaluate the minimal loss of customer load under equilibrium (steady-state) conditions during peak demand.

  17. Wind power development in the United States: Effects of policies and electricity transmission congestion

    Science.gov (United States)

    Hitaj, Claudia

    In this dissertation, I analyze the drivers of wind power development in the United States as well as the relationship between renewable power plant location and transmission congestion and emissions levels. I first examine the role of government renewable energy incentives and access to the electricity grid on investment in wind power plants across counties from 1998-2007. The results indicate that the federal production tax credit, state-level sales tax credit and production incentives play an important role in promoting wind power. In addition, higher wind power penetration levels can be achieved by bringing more parts of the electricity transmission grid under independent system operator regulation. I conclude that state and federal government policies play a significant role in wind power development both by providing financial support and by improving physical and procedural access to the electricity grid. Second, I examine the effect of renewable power plant location on electricity transmission congestion levels and system-wide emissions levels in a theoretical model and a simulation study. A new renewable plant takes the effect of congestion on its own output into account, but ignores the effect of its marginal contribution to congestion on output from existing plants, which results in curtailment of renewable power. Though pricing congestion removes the externality and reduces curtailment, I find that in the absence of a price on emissions, pricing congestion may in some cases actually increase system-wide emissions. The final part of my dissertation deals with an econometric issue that emerged from the empirical analysis of the drivers of wind power. I study the effect of the degree of censoring on random-effects Tobit estimates in finite sample with a particular focus on severe censoring, when the percentage of uncensored observations reaches 1 to 5 percent. The results show that the Tobit model performs well even at 5 percent uncensored observations

  18. Experimental results of wind powered pumping plant with electrical transmission

    International Nuclear Information System (INIS)

    Falchetta, M.; Prischich, D.; Benedetti, A.; Cara, G.

    1992-01-01

    A demonstrative application of deep well pumping system employing a wind powered pumping plant with an electric transmission was set-up and tested for two years at the test field of the Casaccia center of ENEA (Italian Agency for Energy, New Technologies and the Environment), near Rome. The tests permitted the evaluation of the practical performance, advantages and drawbacks of a wind pumping plant of this type, in order to permit a design optimization and a proper choice of components and of control strategies for future commercial applications. The main point of investigation was the evaluation of the effectiveness of a control scheme based on a 'permanent link' between electric generator and electric motor, avoiding any electronics and switching components, and leading to a very robust and reliable means of transferring energy to the pump at variable speed, and at low cost

  19. Market power in the European electricity market - The impacts of dry weather and additional transmission capacity

    International Nuclear Information System (INIS)

    Lise, Wietze; Hobbs, Benjamin F.; Hers, Sebastiaan

    2008-01-01

    This paper uses a static computational game theoretic model of a fully opened European electricity market and can take strategic interaction among electricity-producing firms into account. The model is run for a number of scenarios: first, in the baseline under perfect competition, the prices differ due to the presence of various generation technologies and a limited ability to exchange electricity among countries. In addition, when large firms exercise market power, the model runs indicate that prices are the highest in countries where the number of firms is low. Second, dry weather would increase the prices in the hydro-rich Nordic countries followed by the Alpine countries. The price response would be about 20% higher with market power. Third, more transmission capacity would lower the prices in countries with high prices and it also reduces the impact of market power. Hence, more transmission capacity can improve market competitiveness. (author)

  20. Market power in the European electricity market-The impacts of dry weather and additional transmission capacity

    Energy Technology Data Exchange (ETDEWEB)

    Lise, Wietze [IBS Research and Consultancy, Agahamami Cadessi 1/6, Aga Han, Cihangir, 34433 Beyoglu, Istanbul (Turkey); Energy Markets and International Environmental Policy Group, ECN Policy Studies, Energy Research Centre of the Netherlands, Amsterdam (Netherlands)], E-mail: wietze.lise@ibsresearch.com; Hobbs, Benjamin F. [Department of Geography and Environmental Engineering, Johns Hopkins University, Baltimore, MD 21218 (United States); Hers, Sebastiaan [Energy Markets and International Environmental Policy Group, ECN Policy Studies, Energy Research Centre of the Netherlands, Amsterdam (Netherlands)

    2008-04-15

    This paper uses a static computational game theoretic model of a fully opened European electricity market and can take strategic interaction among electricity-producing firms into account. The model is run for a number of scenarios: first, in the baseline under perfect competition, the prices differ due to the presence of various generation technologies and a limited ability to exchange electricity among countries. In addition, when large firms exercise market power, the model runs indicate that prices are the highest in countries where the number of firms is low. Second, dry weather would increase the prices in the hydro-rich Nordic countries followed by the Alpine countries. The price response would be about 20% higher with market power. Third, more transmission capacity would lower the prices in countries with high prices and it also reduces the impact of market power. Hence, more transmission capacity can improve market competitiveness.

  1. Market power in the European electricity market - The impacts of dry weather and additional transmission capacity

    Energy Technology Data Exchange (ETDEWEB)

    Lise, Wietze [IBS Research and Consultancy, Agahamami Cadessi 1/6, Aga Han, Cihangir, 34433 Beyoglu, Istanbul (Turkey); Energy Markets and International Environmental Policy Group, ECN Policy Studies, Energy Research Centre of the Netherlands, Amsterdam (Netherlands); Hobbs, Benjamin F. [Department of Geography and Environmental Engineering, Johns Hopkins University, Baltimore, MD 21218 (United States); Hers, Sebastiaan [Energy Markets and International Environmental Policy Group, ECN Policy Studies, Energy Research Centre of the Netherlands, Amsterdam (Netherlands)

    2008-04-15

    This paper uses a static computational game theoretic model of a fully opened European electricity market and can take strategic interaction among electricity-producing firms into account. The model is run for a number of scenarios: first, in the baseline under perfect competition, the prices differ due to the presence of various generation technologies and a limited ability to exchange electricity among countries. In addition, when large firms exercise market power, the model runs indicate that prices are the highest in countries where the number of firms is low. Second, dry weather would increase the prices in the hydro-rich Nordic countries followed by the Alpine countries. The price response would be about 20% higher with market power. Third, more transmission capacity would lower the prices in countries with high prices and it also reduces the impact of market power. Hence, more transmission capacity can improve market competitiveness. (author)

  2. Transmission-constrained oligopoly in the Japanese electricity market

    International Nuclear Information System (INIS)

    Tanaka, Makoto

    2009-01-01

    We simulate the Japanese wholesale electricity market as a transmission-constrained Cournot market using a linear complementarity approach. First, we investigate the effects of upgrading the bottleneck transmission line between the eastern and western regions, focusing on the mitigation of transmission congestion. Although increasing the bottleneck capacity would lead to welfare gains, they might not be substantial particularly when transmission capacity costs are taken into account. Second, we examine the effects of splitting the largest electric power company, which is located in the eastern region, focusing on the mitigation of market power. Splitting the largest company into two companies would lead to a 25% reduction in the eastern price, and a 50% reduction in deadweight loss. The divestiture of the largest company would have a significant effect of mitigating market power in the Japanese electricity market. (author)

  3. Electromagnetic Fields Associated with Commercial Solar Photovoltaic Electric Power Generating Facilities.

    Science.gov (United States)

    Tell, R A; Hooper, H C; Sias, G G; Mezei, G; Hung, P; Kavet, R

    2015-01-01

    The southwest region of the United States is expected to experience an expansion of commercial solar photovoltaic generation facilities over the next 25 years. A solar facility converts direct current generated by the solar panels to three-phase 60-Hz power that is fed to the grid. This conversion involves sequential processing of the direct current through an inverter that produces low-voltage three-phase power, which is stepped up to distribution voltage (∼12 kV) through a transformer. This study characterized magnetic and electric fields between the frequencies of 0 Hz and 3 GHz at two facilities operated by the Southern California Edison Company in Porterville, CA and San Bernardino, CA. Static magnetic fields were very small compared to exposure limits established by IEEE and ICNIRP. The highest 60-Hz magnetic fields were measured adjacent to transformers and inverters, and radiofrequency fields from 5-100 kHz were associated with the inverters. The fields measured complied in every case with IEEE controlled and ICNIRP occupational exposure limits. In all cases, electric fields were negligible compared to IEEE and ICNIRP limits across the spectrum measured and when compared to the FCC limits (≥0.3 MHz).

  4. Electricity supply. The effects of competitive power purchases are not yet certain

    International Nuclear Information System (INIS)

    England-Joseph, Judy; Wood, David G.; Bausell, Charles W. Jr.; Farah, Philip G.; Alexander, Alice M.; Griffes, Peter H.; Jorritsma, James S.; Skud, Bruce; Dunbrack, Linda W.

    1990-08-01

    Most electricity in the United States is produced by utilities that own and operate facilities for the generation, transmission, and distribution of power. Utilities traditionally have operated as regulated monopolists, each within an established geographic area. In return, utilities have an obligation to provide reliable electricity to all consumers in their territory at a reasonable price. Many utility companies also participate in power pools, under which they may purchase electricity from one another to meet requirements. Utilities are allowed to earn a return on plants they own and operate, while the costs of purchased electricity are passed directly to consumers. To encourage the development of alternative energy resources, the Public Utility Regulatory Policies Act of 1978, as amended, (PURPA) required utilities to purchase power offered by qualifying facilities at a price not exceeding the utilities' avoided cost of generating it or purchasing it from another source. In part to help state regulators and utilities determine utilities' avoided costs and to help sort through a flood of bids, competitive bidding, which allows market forces to help determine prices, has emerged as a means of purchasing power from nonutility generators. Because several years are often required to construct generating sources, utilities have little operating experience with competitively purchased electricity. Thus, the effects of competitive power purchases on the long-term reliability of electric service - which is affected by the reliability of all sources and transmission and distribution facilities are not yet certain and difficult to assess. Among the three utilities reviewed, only at Central Maine Power have sources of competitively purchased power entered service, and they have operated reliably. However, each utility reviewed has accepted bids that were subsequently withdrawn, for financial or other reasons, prior to scheduled service dates. When selecting nonutility

  5. Shifting and power sharing control of a novel dual input clutchless transmission for electric vehicles

    Science.gov (United States)

    Liang, Jiejunyi; Yang, Haitao; Wu, Jinglai; Zhang, Nong; Walker, Paul D.

    2018-05-01

    To improve the overall efficiency of electric vehicles and guarantee the driving comfort and vehicle drivability under the concept of simplifying mechanism complexity and minimizing manufacturing cost, this paper proposes a novel clutchless power-shifting transmission system with shifting control strategy and power sharing control strategy. The proposed shifting strategy takes advantage of the transmission architecture to achieve power-on shifting, which greatly improves the driving comfort compared with conventional automated manual transmission, with a bump function based shifting control method. To maximize the overall efficiency, a real-time power sharing control strategy is designed to solve the power distribution problem between the two motors. Detailed mathematical model is built to verify the effectiveness of the proposed methods. The results demonstrate the proposed strategies considerably improve the overall efficiency while achieve non-interrupted power-on shifting and maintain the vehicle jerk during shifting under an acceptable threshold.

  6. Final environmental assessment for a refinement of the power delivery component of the Southern Nevada Water Authority Treatment and Transmission Facility

    International Nuclear Information System (INIS)

    1998-07-01

    The Southern Nevada Water Authority (SNWA) is designing and constructing a system of regional water supply facilities to meet current and projected water demands and increase system reliability. The existing Southern Nevada Water system is being upgraded with a number of improvements to increase the capacity of the system. However, even the expanded system is expected to be unable to meet projected peak daily water demands by the year 1999. As a result, new facilities are being designed and constructed to operate in conjunction with the upgraded Southern Nevada Water system. These new facilities, known as the Southern Nevada Water Authority Treatment and Transmission Facility (SNWA-TTF), include four primary components: a new raw water intake; new transmission facilities including below ground pipelines, tunnels, and above ground pumping stations; a water treatment facility; and new power supply facilities. Because existing power supplies would not be adequate for the new water treatment facilities, new power facilities, consisting of two new 230 kV-69 kV substations and new 69 and 230 kV power lines, are being constructed. This environmental assessment is specifically on the new power facilities

  7. Electrical transmission

    Energy Technology Data Exchange (ETDEWEB)

    Sayers, D P

    1960-05-01

    After briefly tracing the history of electricity transmission, trends in high voltage transmission and experiments being conducted on 650 kV are discussed. 5000 miles of the U.K. grid are operated at 132 kV and 1000 at 275 kV, ultimately to provide a super grid at 380 kV. Problems are insulation, radio interference and the cost of underground lines (16 times that of overhead lines). Also considered are the economics of the grid as a means of transporting energy and as a means of spreading the peak load over the power stations in the most efficient manner. Finally, the question of amenities is discussed.

  8. Line Capacity Expansion and Transmission Switching in Power Systems With Large-Scale Wind Power

    DEFF Research Database (Denmark)

    Villumsen, Jonas Christoffer; Bronmo, Geir; Philpott, Andy B.

    2013-01-01

    In 2020 electricity production from wind power should constitute nearly 50% of electricity demand in Denmark. In this paper we look at optimal expansion of the transmission network in order to integrate 50% wind power in the system, while minimizing total fixed investment cost and expected cost...... of power generation. We allow for active switching of transmission elements to reduce congestion effects caused by Kirchhoff's voltage law. Results show that actively switching transmission lines may yield a better utilization of transmission networks with large-scale wind power and increase wind power...

  9. Unforeseen consequences of dedicated renewable energy transmission: Potential implications for renewable electricity development

    Energy Technology Data Exchange (ETDEWEB)

    Bezdek, Roger

    2010-09-15

    Renewable electricity generation requires expansion of electricity transmission, and the U.S. is planning to build a 'green' transmission lines restricted to renewable electricity. However, local jurisdictions are resisting this unless the transmission serves local constituents and existing power plants. This paper finds that if such transmission is built and local access allowed, then the major beneficiaries may be existing power plants. Their access to added transmission could enable them to sell electric power at rates against which renewables cannot compete. These issues must be addressed if large additions of new transmission lines are to facilitate expansion of renewable electricity generation worldwide.

  10. Investment in Electricity Transmission and Ancillary Environmental Benefits

    OpenAIRE

    Burtraw, Dallas; Bharvirkar, Ranjit; Bloyd, Cary

    2002-01-01

    Planning of the electricity transmission system generally focuses on the pros and cons of providing generation close to the source of the power demand versus remote generation linked via the transmission system. Recent electricity supply problems in the western United States have renewed interest in the role of transmission in assuring the reliability of electricity supply. Recently, the Western Governors’ Association led the development of a planning exercise that examined the tradeoffs over...

  11. EVALUATING DEGREE OF ACTIVE POWER LOSSES REDUCTION IN THE ELECTRIC POWER LINES WITH REACTIVE POWER COMPENSATION

    Directory of Open Access Journals (Sweden)

    V. N. Radkevich

    2016-01-01

    Full Text Available The paper considers evaluation procedure for the degree of active power losses reduction in the power transmission lines under 1 kV and 6–10 kV of the systems of electric power supply of industrial enterprises with compensating installations mounted at the side of the customer. The capacitor installations conform to the applied voltage level and factor in dielectric losses in the capacitors. The voltage at the compensating device terminal changes from 0.95 to 1.05 of the capacitors nominal voltage. The study did not account for reactive power losses in the line, nor did it for its charge capacity, conditioned by relative shortness of the cable lines generally operating in the mains of industrial enterprises. For this reason, the quantities of reactive power being consumed and generated by the transmission line are negligible and do not significantly affect the reactive power flux. The researchers obtain functional relations that allow estimating the degree of power loss reduction in the transmission line factoring in its explicit initial data. They perform mathematical analysis of the obtained functional relations and study the function by means of derivatives. The function extremum points are found as well as the intervals of its increment and decrement. A graphical research of the obtained functional relation is performed. It is ascertained that reduction of the active power losses is contingent on the line and the capacitor-installation engineering factors, the electrical energy consumer reactive load value as well as the voltage applied to the capacitor installation. The functional relations presented in the article can be employed in scoping calculation necessary for decision making on the reactive power compensation in systems of the industrial facilities electric power supply. Their account will allow a more accurate estimate of technical and economic effect of the capacitor bank installation in the electrical mains under 1 kV and 6

  12. A methodology to identify stranded generation facilities and estimate stranded costs for Louisiana's electric utility industry

    Science.gov (United States)

    Cope, Robert Frank, III

    1998-12-01

    The electric utility industry in the United States is currently experiencing a new and different type of growing pain. It is the pain of having to restructure itself into a competitive business. Many industry experts are trying to explain how the nation as a whole, as well as individual states, will implement restructuring and handle its numerous "transition problems." One significant transition problem for federal and state regulators rests with determining a utility's stranded costs. Stranded generation facilities are assets which would be uneconomic in a competitive environment or costs for assets whose regulated book value is greater than market value. At issue is the methodology which will be used to estimate stranded costs. The two primary methods are known as "Top-Down" and "Bottom-Up." The "Top-Down" approach simply determines the present value of the losses in revenue as the market price for electricity changes over a period of time into the future. The problem with this approach is that it does not take into account technical issues associated with the generation and wheeling of electricity. The "Bottom-Up" approach computes the present value of specific strandable generation facilities and compares the resulting valuations with their historical costs. It is regarded as a detailed and difficult, but more precise, approach to identifying stranded assets and their associated costs. This dissertation develops a "Bottom-Up" quantitative, optimization-based approach to electric power wheeling within the state of Louisiana. It optimally evaluates all production capabilities and coordinates the movement of bulk power through transmission interconnections of competing companies in and around the state. Sensitivity analysis to this approach is performed by varying seasonal consumer demand, electric power imports, and transmission inter-connection cost parameters. Generation facility economic dispatch and transmission interconnection bulk power transfers, specific

  13. A modular restoration tower for electric power line transmission

    Energy Technology Data Exchange (ETDEWEB)

    Nicolazzi, L.C.; Pereira, J.C.; Leonel, C.E.L.; Rocha, G.B.; Bianchezzi, V.; Mendes, F. [Universidade Federal Santa Catarina (UFSC), Florianopolis, SC (Brazil). Dept. de Engenharia Mecanica], Emails: lauro@grante.ufsc.br, jcarlos@grante.ufsc.br; Luz, R.L. [ELETROSUL Centrais Eletricas S.A., Florianopolis, SC (Brazil)], Email: rluz@eletrosul.gov.br

    2009-07-01

    The main target of this R and D project is to develop an restoration tower for electric energy lines transmission. Whereas these towers should present the main features like transport facility, easiest assembling associated with a low cost of manufacture, it was applied the single-column tower concepts supported by stays, modularized, framed and articulated at the base. The concepts used for this development was a design methodology. From the different definition situations of load, numerical models have been developed focusing the design to the best of structural element arrangements of its modules. Then, tests were performed in laboratory to determine the module structural performance for different work load situations. These tests served to identify inconsistencies in the numerical models and proposed adjustments in its design to improve its performance on the strength and stability. (author)

  14. Relevance of HVDC for electrical power supply; Bedeutung der HGUein der Energieversorgung

    Energy Technology Data Exchange (ETDEWEB)

    Gambach, Herbert; Dorn, Joerg [Siemens AG, Erlangen (Germany). Power Transmission Solutions

    2012-07-01

    The finite availability of fossil energy, the turning away of many countries from nuclear power generation and the need for a limitation of CO{sub 2} emissions influence the future generation and transmission of electrical power in a significant way. In the long term these requirements can be met only by renewable energy sources, for instance solar power and wind. Another aspect is that power generation facilities are in many cases far-off from the load centers. This enforces reliable transmission systems with low losses over long distances. The high voltage direct current (HVDC) transmission complies with these demands in a beneficial way. This paper gives a short overview of the state-of-the-art and describes current developments. (orig.)

  15. Topics on Electricity Transmission Pricing

    Energy Technology Data Exchange (ETDEWEB)

    Bjoerndal, Mette

    2000-02-01

    Within the last decade we have experienced deregulation of several industries, such as airlines, telecommunications and the electric utility industry, the last-mentioned being the focus of this work. Both the telecommunications and the electricity sector depend on network facilities, some of which are still considered as natural monopolies. In these industries, open network access is regarded as crucial in order to achieve the gains from increased competition, and transmission tariffs are important in implementing this. Based on the Energy Act that was introduced in 1991, Norway was among the first countries to restructure its electricity sector. On the supply side there are a large number of competing firms, almost exclusively hydro plants, with a combined capacity of about 23000 MW, producing 105-125 TWh per year, depending on the availability of water. Hydro plants are characterized by low variable costs of operation, however since water may be stored in dams, water has an opportunity cost, generally known as the water value, which is the shadow price of water when solving the generator's inter temporal profit maximization problem. Water values are the main factor of the producers' short run marginal cost. Total consumption amounts to 112-117 TWh a year, and consumers, even households, may choose their electricity supplier independent of the local distributor to which the customer is connected. In fact, approximately 10% of the households have actually changed supplier. The web-site www.konkurransetilsynet.no indicates available contracts, and www.dinside.no provides an ''energy-calculator'' where one can check whether it is profitable to switch supplier. If a customer buys energy from a remote supplier, the local distributor only provides transportation facilities for the energy and is compensated accordingly. Transmission and distribution have remained monopolized and regulated by the Norwegian Water Resources and Energy

  16. Topics in Electricity Transmission Pricing

    Energy Technology Data Exchange (ETDEWEB)

    Bjoerndal, Mette

    2000-02-01

    Within the last decade we have experienced deregulation of several industries, such as airlines, telecommunications and the electric utility industry, the last-mentioned being the focus of this work. Both the telecommunications and the electricity sector depend on network facilities, some of which are still considered as natural monopolies. In these industries, open network access is regarded as crucial in order to achieve the gains from increased competition, and transmission tariffs are important in implementing this. Based on the Energy Act that was introduced in 1991, Norway was among the first countries to restructure its electricity sector. On the supply side there are a large number of competing firms, almost exclusively hydro plants, with a combined capacity of about 23000 MW, producing 105-125 TWh per year, depending on the availability of water. Hydro plants are characterized by low variable costs of operation, however since water may be stored in dams, water has an opportunity cost, generally known as the water value, which is the shadow price of water when solving the generator's inter temporal profit maximization problem. Water values are the main factor of the producers' short run marginal cost. Total consumption amounts to 112-117 TWh a year, and consumers, even households, may choose their electricity supplier independent of the local distributor to which the customer is connected. In fact, approximately 10% of the households have actually changed supplier. The web-site www.konkurransetilsynet.no indicates available contracts, and www.dinside.no provides an ''energy-calculator'' where one can check whether it is profitable to switch supplier. If a customer buys energy from a remote supplier, the local distributor only provides transportation facilities for the energy and is compensated accordingly. Transmission and distribution have remained monopolized and regulated by the Norwegian Water Resources and Energy

  17. Topics on Electricity Transmission Pricing

    International Nuclear Information System (INIS)

    Bjoerndal, Mette

    2000-02-01

    Within the last decade we have experienced deregulation of several industries, such as airlines, telecommunications and the electric utility industry, the last-mentioned being the focus of this work. Both the telecommunications and the electricity sector depend on network facilities, some of which are still considered as natural monopolies. In these industries, open network access is regarded as crucial in order to achieve the gains from increased competition, and transmission tariffs are important in implementing this. Based on the Energy Act that was introduced in 1991, Norway was among the first countries to restructure its electricity sector. On the supply side there are a large number of competing firms, almost exclusively hydro plants, with a combined capacity of about 23000 MW, producing 105-125 TWh per year, depending on the availability of water. Hydro plants are characterized by low variable costs of operation, however since water may be stored in dams, water has an opportunity cost, generally known as the water value, which is the shadow price of water when solving the generator's inter temporal profit maximization problem. Water values are the main factor of the producers' short run marginal cost. Total consumption amounts to 112-117 TWh a year, and consumers, even households, may choose their electricity supplier independent of the local distributor to which the customer is connected. In fact, approximately 10% of the households have actually changed supplier. The web-site www.konkurransetilsynet.no indicates available contracts, and www.dinside.no provides an ''energy-calculator'' where one can check whether it is profitable to switch supplier. If a customer buys energy from a remote supplier, the local distributor only provides transportation facilities for the energy and is compensated accordingly. Transmission and distribution have remained monopolized and regulated by the Norwegian Water Resources and Energy Directorate (NVE). To prevent cross

  18. Transmission : roadway to a competitive electricity market

    Energy Technology Data Exchange (ETDEWEB)

    Thon, S. [AltaLink L.P., AB (Canada)

    2002-07-01

    Having a variety of suppliers, marketers and retailers is the key to developing a successful electricity market which is more competitive on pricing, with less price volatility, more innovative customer products and higher levels of customer services. Some areas of Alberta are developing their own power markets with limited capacity to interact. These include Pincher Creek, Empress, Calgary, Edmonton, and Fort McMurray. It was noted that increasing transmission capacity is the key to ensuring a bigger and more competitive electricity market. Transmission constraints only encourage a small number of suppliers to control the market. The current cost of transmission capacity accounts for less than 5 per cent of an average residential customer's bill, but it plays a major role in providing more choice to competitive electricity suppliers. Developing more transmission capacity will create an even more competitive market that benefits both consumers and suppliers. Prices in Alberta have been very volatile in the past couple of years because of supply and demand issues, and there is a need to increase market liquidity. Alberta's Transmission Administrator is looking to expand the transmission network to alleviate constraints and to lower the cost of power generation, regardless of location. These expansions are not expected to affect customers' bills by more than 2 to 3 per cent. Such transmission concerns are being felt all over North America. The Federal Energy Regulatory Commission (FERC) in the United States also recognizes the link between transmission and creating a competitive electricity market.

  19. The December 7, 1988 Armenia earthquake effects on selected power, industrial and commercial facilities

    International Nuclear Information System (INIS)

    Campbell, R.D.; Griffin, M.J.; Bragagnolo, L.J.; Yanev, P.I.

    1996-01-01

    A detailed overview of the Armenia earthquake (occurred on December 7, 1988) effects on selected power, industrial and commercial facilities is presented in this paper. It involves geologic and seismology study of the region; description of the design building standards; detailed description of the damaged nuclear and other power plants as well as other industrial facilities. Extensive damage was sustained by the industrial facilities in the epicentral area, the majority due to poor design and construction. The effects on power facilities were much less severe. response time to restore power to the transmission was 2 to 3 days following the earthquake. Power plant equipment without rigorous seismic design performed well. Mechanical equipment, pumps, valves, compressors, and piping all performed with minimal damage, Electrical control equipment if properly anchored performed well without exception

  20. New South Wales' new electricity transmission authority

    International Nuclear Information System (INIS)

    Fahey, J.

    1995-01-01

    The latest milestone in electricity reform in NSW was the formation of a new statutory authority, the Electricity Transmission Authority (ETA), to take over and operate the transmission assets of Pacific Power, formerly the New South Wales Electricity Commission. The ETA will be operational from 1 February 1995, in time for the proposed commencement of a national electricity market on 1 July 1995. The forces of competition are being used to improve the efficiency of the industry, to empower consumers with greater choice and to open up new opportunities for private-sector participation in the industry. Potentially commercial activities such as coal mines have been separated from the operational arm of Pacific Power so that they have to compete with the private sector in supplying power stations. Significant reductions have been made in the price of electricity to reduce existing cross-subsidizations so that commercial and industrial customers gain the biggest benefits. The new ETA will pay dividends to the NSW government, as private companies pay dividends to their shareholders, and it will be subject to the federal tax-equivalent regime. 2 photos

  1. Test facility for the evaluation of microwave transmission components

    International Nuclear Information System (INIS)

    Fong, C.G.; Poole, B.R.

    1985-01-01

    A Low Power Test Facility (LPTF) was developed to evaluate the performance of Electron Cyclotron Resonance Heating (ECRH) microwave transmission components for the Mirror Fusion Test Facility (MFTF-B). The facility generates 26 to 60 GHz in modes of TE 01 , TE 02 , or TE 03 launched at power levels of 1/2 milliwatt. The propagation of the rf as it radiates from either transmitting or secondary reflecting microwave transmission components is recorded by a discriminating crystal detector mechanically manipulated at constant radius in spherical coordinates. The facility is used to test, calibrate, and verify the design of overmoded, circular waveguide components, quasi-optical reflecting elements before high power use. The test facility consists of microwave sources and metering components, such as VSWR, power and frequency meters, a rectangular TE 10 to circular TE 01 mode transducer, mode filter, circular TE 01 to 2.5 in. diameter overmoded waveguide with mode converters for combination of TE 01 to TE 03 modes. This assembly then connects to a circular waveguide launcher or the waveguide component under test

  2. Prices on electricity and transmission of electricity

    International Nuclear Information System (INIS)

    2003-01-01

    This publication contains data on prices of electric energy and transmission of electricity valid from 1 January 2003. The purpose is to illustrate the price changes on the electricity market in terms of prices for different customer categories. All companies holding network concessions for areas and all companies trading in electricity are included in this report, which is produced on an annual basis.The prices for transmission services 1 January 2003 were on the whole unchanged compared to the preceding year. For households the mean annual cost was SEK 882 for flats, SEK 4 335 for one- or two-family houses with electric heating and SEK 1 925 for those without electric heating. Electricity prices rose considerably on 1 January 2003 compared to the year before. The mean price per kWh for households with standard agreements was SEK 0.519 for deliveries to flats, SEK 0.447 for one- or two-family houses with electric heating and SEK 0.471 without electric heating. As a result, the mean annual cost increased by SEK 326 for flats, SEK 3 012 for one- or two-family houses with electric heating, and by SEK 774 for those houses without electric heating. The high costs of electricity may be explained in part by the development on the Nordic Power Exchange (Nord Pool), where the spot price increased by about 290 per cent during 2002 (1 USD is about 8 SEK)

  3. Electric power substations engineering

    CERN Document Server

    McDonald, John D

    2012-01-01

    The use of electric power substations in generation, transmission, and distribution remains one of the most challenging and exciting areas of electric power engineering. Recent technological developments have had a tremendous impact on all aspects of substation design and operation. With 80% of its chapters completely revised and two brand-new chapters on energy storage and Smart Grids, Electric Power Substations Engineering, Third Edition provides an extensive updated overview of substations, serving as a reference and guide for both industry and academia. Contributors have written each chapt

  4. Economic impacts of zebra mussels on drinking water treatment and electric power generation facilities.

    Science.gov (United States)

    Connelly, Nancy A; O'Neill, Charles R; Knuth, Barbara A; Brown, Tommy L

    2007-07-01

    Invasions of nonnative species such as zebra mussels can have both ecological and economic consequences. The economic impacts of zebra mussels have not been examined in detail since the mid-1990s. The purpose of this study was to quantify the annual and cumulative economic impact of zebra mussels on surface water-dependent drinking water treatment and electric power generation facilities (where previous research indicated the greatest impacts). The study time frame was from the first full year after discovery in North America (Lake St. Clair, 1989) to the present (2004); the study area was throughout the mussels' North American range. A mail survey resulted in a response rate of 31% for electric power companies and 41% for drinking water treatment plants. Telephone interviews with a sample of nonrespondents assessed nonresponse bias; only one difference was found and adjusted for. Over one-third (37%) of surveyed facilities reported finding zebra mussels in the facility and almost half (45%) have initiated preventive measures to prevent zebra mussels from entering the facility operations. Almost all surveyed facilities (91%) with zebra mussels have used control or mitigation alternatives to remove or control zebra mussels. We estimated that 36% of surveyed facilities experienced an economic impact. Expanding the sample to the population of the study area, we estimated 267 million dollars (BCa 95% CI = 161 million dollars - 467 million dollars) in total economic costs for electric generation and water treatment facilities through late 2004, since 1989. Annual costs were greater (44,000 dollars/facility) during the early years of zebra mussel infestation than in recent years (30,000 dollars). As a result of this and other factors, early predictions of the ultimate costs of the zebra mussel invasion may have been excessive.

  5. Report on emergency electrical power supply systems for nuclear fuel cycle and reactor facilities security systems

    International Nuclear Information System (INIS)

    1977-01-01

    The report includes information that will be useful to those responsible for the planning, design and implementation of emergency electric power systems for physical security and special nuclear materials accountability systems. Basic considerations for establishing the system requirements for emergency electric power for security and accountability operations are presented. Methods of supplying emergency power that are available at present and methods predicted to be available in the future are discussed. The characteristics of capacity, cost, safety, reliability and environmental and physical facility considerations of emergency electric power techniques are presented. The report includes basic considerations for the development of a system concept and the preparation of a detailed system design

  6. Report on emergency electrical power supply systems for nuclear fuel cycle and reactor facilities security systems

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    The report includes information that will be useful to those responsible for the planning, design and implementation of emergency electric power systems for physical security and special nuclear materials accountability systems. Basic considerations for establishing the system requirements for emergency electric power for security and accountability operations are presented. Methods of supplying emergency power that are available at present and methods predicted to be available in the future are discussed. The characteristics of capacity, cost, safety, reliability and environmental and physical facility considerations of emergency electric power techniques are presented. The report includes basic considerations for the development of a system concept and the preparation of a detailed system design.

  7. Eco-design of power transmissions systems

    International Nuclear Information System (INIS)

    Wang, W.

    2011-01-01

    The demand to preserve the environment and form a sustainable development is greatly increasing in the recent decades all over the world, and this environmental concern is also merged in electrical power industry, resulting in many eco-design approaches in Transmission and Distribution (T and D) industries. As a method of eco-design, Life Cycle Assessment (LCA) is a systematic tool that enables the assessment of the environmental impacts of a product or service throughout its entire life cycle, i.e. raw material production, manufacture, distribution, use and disposal including all intervening transportation steps necessary or caused by the product's existence. In T and D industries, LCA has been done for a lot of products individually, in order to see one product's environmental impacts and to seek for ways of improving its environmental performance. This eco-design for product approach is a rather well-developed trend, however, as only a single electrical product cannot provide the electrical power to users, electrical system consists of a huge number of components, in order to investigate system's environmental profile, the entire environmental profiles of different composing products has to be integrated systematically, that is to say, a system approach is needed. Under this philosophy, the study 'Eco-design of Power Transmission Systems' is conducted in this thesis, with the purpose of analysing the transmission systems' environmental impacts, locating the major environmental burden sources of transmission systems, selecting and/or developing methodologies of reducing its environmental impacts. (author)

  8. Electric power supply and demand 1979 to 1988 for the contiguous United States as projected by the Regional Electric Reliability Councils in their April 1, 1979 long-range coordinated planning reports to the Department of Energy

    Energy Technology Data Exchange (ETDEWEB)

    Savage, N.; Graban, W.

    1979-12-01

    Information concerning bulk electric power supply and demand is summarized and reviewed. Electric-utility power-supply systems are composed of power sources, transmission and distribution facilities, and users of electricity. In the United States there are three such systems of large geographic extent that together cover the entire country. Subjects covered are: energy forecasts, peak demand forecasts, generating-capacity forecasts, purchases and sales of capacity, and transmission. Extensive data are compiled in 17 tables. Information in two appendices includes a general description of the Regional Electric Reliability Councils and US generating capacity as of June 30, 1979. 3 figures, 17 tables.

  9. Alternative forms of energy transmission from OTEC plants. [Chemical and electrical

    Energy Technology Data Exchange (ETDEWEB)

    Konopka, A.; Biederman, N.; Talib, A.; Yudow, B.

    1977-01-01

    The transmission of OTEC-derived chemical and electrical energy is compared. The chemical energy-carriers considered are the following: gaseous and liquid hydrogen, liquid ammonia, methanol, gasoline, hydrazine hydrate, anhydrous hydrazine, unsymmetrical dimethylhydrazine (UDMH), 1,7-Octadiyne, and tetrahydrodicyclopentadiene. The assessment assumes that each of the above energy carriers were transported by barge and/or pipeline. The delivered costs were then compared with transmission of electricity by submarine cables. Because chemical and electrical energy are not equivalent, however, their comparison can only be done after the outputs are converted to a common form. Thus, in addition to presenting the delivered cost and overall energy efficiency of the chemical energy-carriers, we have provided a discussion of the equipment, costs, and efficiencies of converting the hydrogen and ammonia delivered into electricity, and the electricity delivered into hydrogen and ammonia. A concise technical assessment and economic analysis of components associated with the conversion, storage, transportation, and shore-based receiving facilities for the conversion of OTEC mechanical energy to chemical energy is provided and compared to the conversion and transmission of electrical power. Results concerning the hydrogen and ammonia analysis were determined as part of the OTEC program at IGT from May 1975 through May 1976 under Contract No. NSF-C1008 (AER-75-00033) with the National Science Foundation and ERDA. Information concerning carbonaceous fuels and high-energy fuels production was developed as part of the current IGT OTEC program under Contract No. E(49-18)-2426 with ERDA.

  10. Alteration in reactor installations (Unit 1 and 2 reactor facilities) in the Hamaoka Nuclear Power Station of The Chubu Electric Power Co., Inc. (report)

    International Nuclear Information System (INIS)

    1982-01-01

    A report by the Nuclear Safety Commission to the Ministry of International Trade and Industry concerning the alteration in Unit 1 and 2 reactor facilities in the Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc., was presented. The technical capabilities for the alteration of reactor facilities in Chubu Electric Power Co., Inc., were confirmed to be adequate. The safety of the reactor facilities after the alteration was confirmed to be adequate. The items of examination made for the confirmation of the safety are as follows: reactor core design (nuclear design, mechanical design, mixed reactor core), the analysis of abnormal transients in operation, the analysis of various accidents, the analysis of credible accidents for site evaluation. (Mori, K.)

  11. Calculation of Voltages in Electric Power Transmission Lines During Historic Geomagnetic Storms: An Investigation Using Realistic Earth Impedances

    Science.gov (United States)

    Lucas, Greg M.; Love, Jeffrey J.; Kelbert, Anna

    2018-02-01

    Commonly, one-dimensional (1-D) Earth impedances have been used to calculate the voltages induced across electric power transmission lines during geomagnetic storms under the assumption that much of the three-dimensional structure of the Earth gets smoothed when integrating along power transmission lines. We calculate the voltage across power transmission lines in the mid-Atlantic region with both regional 1-D impedances and 64 empirical 3-D impedances obtained from a magnetotelluric survey. The use of 3-D impedances produces substantially more spatial variance in the calculated voltages, with the voltages being more than an order of magnitude different, both higher and lower, than the voltages calculated utilizing regional 1-D impedances. During the March 1989 geomagnetic storm 62 transmission lines exceed 100 V when utilizing empirical 3-D impedances, whereas 16 transmission lines exceed 100 V when utilizing regional 1-D impedances. This demonstrates the importance of using realistic impedances to understand and quantify the impact that a geomagnetic storm has on power grids.

  12. Transmission access issues: Present and future

    International Nuclear Information System (INIS)

    Bahl, P.K.; Gray, R.G.

    1992-01-01

    In recent years, the electric industry has undergone dramatic changes as the federal and state governments have encouraged bulk power production by Independent Power Producers (IPPS) and Qualified Facilities (QFs). With decentralization and the consequent competition in the field of bulk power production, there has emerged the problem of non-utility generators (NUGS) and of transmission dependent utilities accessing the existing transmission systems owned by electric utilities. This paper presents current and future issues related to transmission access by IPPS, QFs and transmission dependent utilities. These issues include: (a) impact on system reliability, (b) impact of pricing strategies, (c) changes in state and federal regulations, (d) transmission proposals by various entities, (e) present access arrangements, (f) formation of the Western Systems Power Pool (WSPP), and (g) siting difficulties. The transmission access problem warrants consideration of transmission services, coordination among electric utilities, joint planning on a regional basis, and accommodation of IPPs and NUGs

  13. Design of synchromesh mechanism to optimization manual transmission's electric vehicle

    Science.gov (United States)

    Zainuri, Fuad; Sumarsono, Danardono A.; Adhitya, Muhammad; Siregar, Rolan

    2017-03-01

    Significant research has been attempted on a vehicle that lead to the development of transmission that can reduce energy consumption and improve vehicle efficiency. Consumers also expect safety, convenience, and competitive prices. Automatic transmission (AT), continuously variable transmission (CVT), and dual clutch transmission (DCT) is the latest transmission developed for road vehicle. From literature reviews that have been done that this transmission is less effective on electric cars which use batteries as a power source compared to type manual transmission, this is due to the large power losses when making gear changes. Zeroshift system is the transmission can do shift gears with no time (zero time). It was developed for the automatic manual transmission, and this transmission has been used on racing vehicles to eliminate deceleration when gear shift. Zeroshift transmission still use the clutch to change gear in which electromechanical be used to replace the clutch pedal. Therefore, the transmission is too complex for the transmission of electric vehicles, but its mechanism is considered very suitable to increase the transmission efficiency. From this idea, a new innovation design transmission will be created to electric car. The combination synchromesh with zeroshift mechanism for the manual transmission is a transmission that is ideal for improving the transmission efficiency. Installation synchromesh on zeroshift mechanism is expected to replace the function of the clutch MT, and assisted with the motor torque setting when to change gear. Additionally to consider is the weight of the transmission, ease of manufacturing, ease of installation with an electric motor, as well as ease of use by drivers is a matter that must be done to obtain a new transmission system that is suitable for electric cars.

  14. Transmission topologies for the integration of renewable power into the electricity systems of North Africa

    International Nuclear Information System (INIS)

    Brand, Bernhard

    2013-01-01

    A cost-minimizing electricity market model was used to explore optimized infrastructures for the integration of renewable energies in interconnected North African power systems until 2030. The results show that the five countries Morocco, Algeria, Tunisia, Libya and Egypt could together achieve significant economic benefits, reaching up to €3.4 billion, if they increase power system integration, build interconnectors and cooperate on joint utilization of their generation assets. Net electricity exports out of North Africa to Europe or Eastern Mediterranean regions, however, were not observed in the regime of integrated electricity markets until 2030, and could only be realized by much higher levels of renewable energy penetration than currently foreseen by North African governments. - Highlights: • Market model to optimize North Africa's generation and transmission infrastructures until 2030. • Simulations consider existing interconnectors, power plant inventories, as well as national renewable goals. • Savings of up to €3.4 billion can be realized by more cooperation and integrated system planning. • No electricity exports to Europe in a competitive market framework, except for very high renewable penetrations

  15. Prices on electricity and transmission of electricity

    International Nuclear Information System (INIS)

    2002-01-01

    This publication contains data on prices of electric energy and transmission of electricity valid on 1 January 2002. The purpose is to illustrate the price changes on the electricity market in terms of prices for different customer categories. All companies holding network concessions for areas and all companies trading in electricity are included in this report, which is produced on an annual basis. The prices for transmission services 1 January 2002 were on the whole unchanged compared to the preceding year. For households the mean annual cost was SEK 856 for flats, SEK 4,194 one- or two-family houses with electric heating and SEK 1,881 without electric heating. (1 SEK ∼ 0.1 USD). Electricity prices rose considerably on 1 January 2002 compared to the year before. The mean price per kWh for households according to standard agreement was SEK 0.356 for deliveries to flats, SEK 0.296 for apartments in one- or two-family houses with electric heating and SEK 0.316 without electric heating. That means that the mean annual cost increased by SEK 171 for flats. For one- or two-family houses with electric heating, costs increased by SEK 1,424, and by SEK 379 for those houses without electric heating. The high costs of electricity may be explained in part by the development on the Nordic Power Exchange (Nord Pool), where the spot price increased by 75 per cent during 2001. The price development for household customers during 1996-2002 is shown in a diagram

  16. Outline of electric power installation plan for fiscal 1981

    International Nuclear Information System (INIS)

    Murakami, Masami

    1981-01-01

    The electric power installation plan for fiscal 1981 was submitted by power companies to the Minister of International Trade and Industry at the end of March. In 1990, the total demand of electric power will be 907.9 billion kWh, and the yearly rate of growth will be about 5%. The peak demand of electric power continues to be acute, and is expected to be 175.74 million kW. In order to supply power so as to always balance the demand, the reserve power of 8 to 10% of the maximum demand is required. According to the submitted plan, the power sources determined already are not sufficient, therefore it was planned to present 61 plants of 11.94 million kW in 1981 and 64 plants of 19.61 million kW in 1982 to the Power Source Development Coordination Council. If the power source development progresses as planned, the adequate rate to reserve is maintained up to 1990, and the stable supply of electric power seems to be secured. However when some delay occurs in the plan, serious obstacle to the demand and supply may arise. This plan fundamentally follows the policy to deversify power sources toward the target of substitute energy supply for petroleum. The power transmission facilities are also strengthened and expanded. The investment plan for fiscal 1981 is shown. (Kako, I.)

  17. Electric power generation

    International Nuclear Information System (INIS)

    Pinske, J.D.

    1981-01-01

    Apart from discussing some principles of power industry the present text deals with the different ways of electric power generation. Both the conventional methods of energy conversion in heating and water power stations and the facilities for utilizing regenerative energy sources (sun, wind, ground heat, tidal power) are considered. The script represents the essentials of the lecture of the same name which is offered to the students of the special subject 'electric power engineering' at the Fachhochschule Hamburg. It does not require any special preliminary knowledge except for the general principles of electrical engineering. It is addressing students of electrical engineering who have passed their preliminary examination at technical colleges and universities. Moreover, it shall also be of use for engineers who want to obtain a quick survey of the structure and the operating characteristics of the extremely different technical methods of power generation. (orig.) [de

  18. Design and Testing of a Breadboard Electrical Power Control Unit for the Fluid Combustion Facility Experiment

    Science.gov (United States)

    Kimnach, Greg L.; Lebron, Ramon C.

    1999-01-01

    The Fluid Combustion Facility (FCF) Project and the Power Technology Division at the NASA Glenn Research Center (GRC) at Lewis Field in Cleveland, OH along with the Sundstrand Corporation in Rockford, IL are jointly developing an Electrical Power Converter Unit (EPCU) for the Fluid Combustion Facility to be flown on the International Space Station (ISS). The FCF facility experiment contains three racks: A core rack, a combustion rack, and a fluids rack. The EPCU will be used as the power interface to the ISS 120V(sub dc) power distribution system by each FCF experiment rack which requires 28V(sub dc). The EPCU is a modular design which contains three 120V(sub dc)-to-28V(sub dc) full-bridge, power converters rated at 1 kW(sub e) each bus transferring input relays and solid-state, current-limiting input switches, 48 current-limiting, solid-state, output switches; and control and telemetry hardware. The EPCU has all controls required to autonomously share load demand between the power feeds and--if absolutely necessary--shed loads. The EPCU, which maximizes the usage of allocated ISS power and minimizes loss of power to loads, can be paralleled with other EPCUs. This paper overviews the electrical design and operating characteristics of the EPCU and presents test data from the breadboard design.

  19. Effects of long-term contracts on firms exercising market power in transmission constrained electricity markets

    International Nuclear Information System (INIS)

    Nam, Young Woo; Yoon, Yong Tae; Park, Jong-Keun; Hur, Don; Kim, Sung-Soo

    2006-01-01

    The electricity markets with only few large firms are often vulnerable to less competitive behaviors than the desired. The presence of transmission constraints further restrict the competition among firms and provide more opportunities for firms to exercise market power. While it is generally acknowledged that the long-term contracts provide good measures for mitigating market power in the spot market (thus reducing undesired price spikes), it is not even more clear how effective these contracts are if the market is severely limited due to transmission constraints. In this paper, an analytical approach through finding a Nash equilibrium is presented to investigate the effects of long-term contracts on firms exercising market power in a bid-based pool with transmission constraints. Surprisingly the analysis in this paper shows that the presence of long-term contracts may result in the reduced expected social welfare. A straightforward consequence of the analysis presented in this paper will be helpful for the regulators in Korea to reconsider offering vesting contracts to generating companies in the near future. (author)

  20. Fault detection and classification in electrical power transmission system using artificial neural network.

    Science.gov (United States)

    Jamil, Majid; Sharma, Sanjeev Kumar; Singh, Rajveer

    2015-01-01

    This paper focuses on the detection and classification of the faults on electrical power transmission line using artificial neural networks. The three phase currents and voltages of one end are taken as inputs in the proposed scheme. The feed forward neural network along with back propagation algorithm has been employed for detection and classification of the fault for analysis of each of the three phases involved in the process. A detailed analysis with varying number of hidden layers has been performed to validate the choice of the neural network. The simulation results concluded that the present method based on the neural network is efficient in detecting and classifying the faults on transmission lines with satisfactory performances. The different faults are simulated with different parameters to check the versatility of the method. The proposed method can be extended to the Distribution network of the Power System. The various simulations and analysis of signals is done in the MATLAB(®) environment.

  1. Calculation of voltages in electric power transmission lines during historic geomagnetic storms: An investigation using realistic earth impedances

    Science.gov (United States)

    Lucas, Greg M.; Love, Jeffrey J.; Kelbert, Anna

    2018-01-01

    Commonly, one-dimensional (1-D) Earth impedances have been used to calculate the voltages induced across electric power transmission lines during geomagnetic storms under the assumption that much of the three-dimensional structure of the Earth gets smoothed when integrating along power transmission lines. We calculate the voltage across power transmission lines in the mid-Atlantic region with both regional 1-D impedances and 64 empirical 3-D impedances obtained from a magnetotelluric survey. The use of 3-D impedances produces substantially more spatial variance in the calculated voltages, with the voltages being more than an order of magnitude different, both higher and lower, than the voltages calculated utilizing regional 1-D impedances. During the March 1989 geomagnetic storm 62 transmission lines exceed 100 V when utilizing empirical 3-D impedances, whereas 16 transmission lines exceed 100 V when utilizing regional 1-D impedances. This demonstrates the importance of using realistic impedances to understand and quantify the impact that a geomagnetic storm has on power grids.

  2. Network Theory Integrated Life Cycle Assessment for an Electric Power System

    Directory of Open Access Journals (Sweden)

    Heetae Kim

    2015-08-01

    Full Text Available In this study, we allocate Greenhouse gas (GHG emissions of electricity transmission to the consumers. As an allocation basis, we introduce energy distance. Energy distance takes the transmission load on the electricity energy system into account in addition to the amount of electricity consumption. As a case study, we estimate regional GHG emissions of electricity transmission loss in Chile. Life cycle assessment (LCA is used to estimate the total GHG emissions of the Chilean electric power system. The regional GHG emission of transmission loss is calculated from the total GHG emissions. We construct the network model of Chilean electric power grid as an undirected network with 466 nodes and 543 edges holding the topology of the power grid based on the statistical record. We analyze the total annual GHG emissions of the Chilean electricity energy system as 23.07 Mt CO2-eq. and 1.61 Mt CO2-eq. for the transmission loss, respectively. The total energy distance for the electricity transmission accounts for 12,842.10 TWh km based on network analysis. We argue that when the GHG emission of electricity transmission loss is estimated, the electricity transmission load should be separately considered. We propose network theory as a useful complement to LCA analysis for the complex allocation. Energy distance is especially useful on a very large-scale electric power grid such as an intercontinental transmission network.

  3. Wireless transmission of power

    International Nuclear Information System (INIS)

    Grotz, T.

    1991-01-01

    This paper reports that it has been proven by researchers that electrical energy can be propagated around the world between the surface of the Earth and the ionosphere at extremely low frequencies in what is known as the Schumann Cavity. Experiments to data have shown that electromagnetic waves with frequencies in the range of 8 Hz, the fundamental Schumann Resonance frequency, propagate with litter attenuation around the planet within the Schumann Cavity. It is the intent of this research to determine if the Schumann Cavity can be resonated, if the power that is delivered to the cavity propagated with very low losses, and if power can be extracted at other locations within the cavity. Experimental data collected and calculations made in recent years support the hypothesis that wireless power transmission is a viable and practical alternative to the present systems of power transmission

  4. Risk management in electricity markets emphasizing transmission congestion

    International Nuclear Information System (INIS)

    Kristiansen, Tarjei

    2004-01-01

    This thesis analyzes transmission pricing, transmission congestion risks and their associated hedging instruments as well as mechanisms for stimulating investments in transmission expansion. An example of risk management in the case of a hydropower producer is included. After liberalization and restructuring of electricity markets, risk management has become important. In particular the thesis analyzes risks due to transmission congestion both in the short- and long-term (investments) for market players such as generators, loads, traders, independent system operators and merchant investors. The work is focused on the northeastern United States electricity markets and the Nordic electricity markets. The first part of the thesis reviews the literature related to the eight research papers in the thesis. This describes the risks that are relevant for an electricity market player and how these can be managed. Next, the basic ingredients of a competitive electricity market are described including the design of the system operator. The transmission pricing method is decisive for hedging against transmission congestion risks and there is an overview of transmission pricing models considering their similarities and differences. Depending on the transmission pricing method used, locational or area (zonal) pricing, the electricity market players can use financial transmission rights or Contracts for Differences, respectively. In the long-term it is important to create mechanisms for investments in transmission expansion and the thesis describes one possible approach and its potential problems. The second part comprises eight research papers. It presents empirical analyses of existing markets for transmission congestion derivatives, theoretical analyses of transmission congestion derivatives, modeling of merchant long-term financial transmission rights, theoretical analysis of the risks of the independent system operator in providing financial transmission rights, an analysis

  5. 33 CFR 127.107 - Electrical power systems.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Electrical power systems. 127.107... Waterfront Facilities Handling Liquefied Natural Gas § 127.107 Electrical power systems. (a) The electrical power system must have a power source and a separate emergency power source, so that failure of one...

  6. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

  7. Market power in deregulated electricity markets : a review of the recent experience

    International Nuclear Information System (INIS)

    Mullin, K.; Trebilcock, M.

    2003-01-01

    Traditionally, the electric power industry has been headed by vertically integrated monopolies that combined power generation, transmission, distribution and retail components of electricity supply. Electric utilities were generally publicly owned and subjected to rate-of-return regulation. The industry in many jurisdictions is now being unbundled with the advent of new generation technology that has led the way for small generation facilities to produce competitively priced electricity and enter the electricity market. Regulators have recognized that private monopolies had little incentive to minimize costs resulting in inefficient operation of the utility. The challenge lies in designing a system that truly promotes competitive markets. This presentation examined the characteristics of market power and described the experiences of several jurisdictions in dealing with possible market power abuse. The presentation also presented lessons learned in California, Pennsylvania, New Jersey, Maryland, New Zealand, Alberta, and Ontario that could be applied to future electricity markets. In conclusion, the authors state that governments should use caution when implementing across-the-board price caps, because doing so discourages new investment in generation capacity.152 refs

  8. Electrical-Loss Analysis of Power-Split Hybrid Electric Vehicles

    Directory of Open Access Journals (Sweden)

    Andrea Bonfiglio

    2017-12-01

    Full Text Available The growing development of hybrid electric vehicles (HEVs has seen the spread of architectures with transmission based on planetary gear train, realized thanks to two electric machines. This architecture, by continuously regulating the transmission ratio, allows the internal combustion engine (ICE to work in optimal conditions. On the one hand, the average ICE efficiency is increased thanks to better loading situations, while, on the other hand, electrical losses are introduced due to the power circulation between the two electrical machines mentioned above. The aim of this study is then to accurately evaluate electrical losses and the average ICE efficiency in various operating conditions and over different road missions. The models used in this study are presented for both the Continuously Variable Transmission (CVT architecture and the Discontinuously Variable Transmission (DVT architecture. In addition, efficiency maps of the main components are shown. Finally, the simulation results are presented to point out strengths and weaknesses of the CVT architecture.

  9. Resilience of electricity grids against transmission line overloads under wind power injection at different nodes.

    Science.gov (United States)

    Schiel, Christoph; Lind, Pedro G; Maass, Philipp

    2017-09-14

    A steadily increasing fraction of renewable energy sources for electricity production requires a better understanding of how stochastic power generation affects the stability of electricity grids. Here, we assess the resilience of an IEEE test grid against single transmission line overloads under wind power injection based on the dc power flow equations and a quasi-static grid response to wind fluctuations. Thereby we focus on the mutual influence of wind power generation at different nodes. We find that overload probabilities vary strongly between different pairs of nodes and become highly affected by spatial correlations of wind fluctuations. An unexpected behaviour is uncovered: for a large number of node pairs, increasing wind power injection at one node can increase the power threshold at the other node with respect to line overloads in the grid. We find that this seemingly paradoxical behaviour is related to the topological distance of the overloaded line from the shortest path connecting the wind nodes. In the considered test grid, it occurs for all node pairs, where the overloaded line belongs to the shortest path.

  10. Report of the Task Group on Electrical Safety of Department of Energy facilities

    Energy Technology Data Exchange (ETDEWEB)

    None

    1993-01-01

    The Task Group on Electrical Safety at DOE Facilities (Task Group), which was formally established on October 27, 1992. The Task Group reviewed the electrical safety-related occurrence history of, and conducted field visits to, seven DOE sites chosen to represent a cross section of the Department`s electrical safety activities. The purpose of the field visits was to review, firsthand, electrical safety programs and practices and to gain greater insight to the root causes and corrective actions taken for recently reported incidents. The electrical safety environment of the DOE complex is extremely varied, ranging from common office and industrial electrical systems to large high-voltage power distribution systems (commercial transmission line systems). It includes high-voltage/high-power systems associated with research programs such as linear accelerators and experimental fusion confinement systems. Age, condition, and magnitude of the facilities also varies, with facilities dating from the Manhattan Project, during World War II, to the most modem complexes. The complex is populated by Federal (DOE and other agencies) and contractor employees engaged in a wide variety of occupations and activities in office, research and development, and industrial settings. The sites visited included all of these variations and are considered by the Task Group to offer a valid representation of the Department`s electrical safety issues. The sites visited were Oak Ridge National Laboratory (ORNL), Stanford Linear Accelerator Center (SLAC), Idaho National Engineering Laboratory (INEL), Nevada Test Site (NTS), Savannah River Site (SRS), Hanford Reservation (Hanford), and the Uranium Mill Tailings Remedial Action Project (UMTRA) located at Grand Junction, Colorado.

  11. Safety awareness educational topics for the construction of power transmission systems with smart grid technologies

    Directory of Open Access Journals (Sweden)

    Bryan Hubbard

    2013-09-01

    Full Text Available Power transmission facilities in the U.S. are undergoing a transformation due to the increased use of distributed generation sources such as wind and solar power.  The current power grid system is also antiquated and in need of substantial retrofits to make it more efficient and reliable.  The new energy transmission system being designed and built to optimize power delivery is known as “Smart Grid”.  The increased activity in the construction of power transmission facilities and installation of new technologies into the current power system raises potential safety concerns.  Existing construction management curriculum may include general information about safety training, but does not typically include information about this specialized sector.  The objective of this study was to work with industry to identify key safety topics appropriate for inclusion in an introductory industrial construction course.  Results of interviews with industry identified numerous hazards that are not typically covered in typical construction curricula.  A joint undergraduate and graduate course in industrial construction was created to address these and additional concepts. A survey of the students was performed to determine the effectiveness of the course and also to determine their thoughts about the smart grid technologies and safety training. Information on electrical system hazards is presented along with results of the student surveys.

  12. Optimum operation of a small power production facility

    Energy Technology Data Exchange (ETDEWEB)

    Capehart, B.L.; Mahoney, J.F.; Sivazlian, B.D.

    1983-09-01

    To help reduce the U.S.A.'s dependence on imported oil for electrical power generation, the 1978 National Energy Act established regulations to promote construction and operation of cogeneration and small power production facilities. Many of these facilities are presently under construction, with a great number planned. This paper examines the operation of a small power production facility with on-site generation and storage, on-site use, and connection to an electric utility grid system for the purpose of both selling excess power and buying power. It is assumed that the buying and selling price of electricity varies frequently during the day and that the relevant price and demand data may be accurately projected into the near future. With this system description, a mathematical model is formulated and solved by linear programming to obtain a series of periodic buy and sell decisions so as to maximize the profit from operating the small power production facility. Results are presented to illustrate the methodology for determining potential profits.

  13. Electric power statistics from independence to establishment

    International Nuclear Information System (INIS)

    1997-02-01

    This paper reports power statistics from independence to establishment pf KEPIC. It has the lists of electricity industry, electric equipment on the whole country power equipment at the independence and development of power facility, power generation about merit of power plants, demand according to types and use, power loss, charge for electric power distribution, power generation and generating cost, financial lists on income measurement and financing, meteorological phenomena and amount of rainfall electric power development, international statistics on major countries power generation and compare power rates with general price.

  14. Creating a robust and integrated electrical transmission system

    International Nuclear Information System (INIS)

    McLain, S.

    2004-01-01

    The service territory for Puget Sound Energy (PSE) was presented in terms of electric power and gas transmission. Issues affecting the Puget Sound area include high growth and the west coast energy crisis which has had an adverse financial impact on the power industry. The transmission system is basically at capacity and has been impacted by imports and exports between the United States and Canada. Other issues include the separation between energy resources and transmission, modernizing the power grid, and challenges for independent power producers (IPPs). The Northwest Transmission Assessment Committee (NTAC), which was formed under the Northwest Power Pool, has the potential to bring interested parties to study constrained paths and to plan a single utility concept for the region. It is expected that new challenges such as financing and risk management will emerge once the technical solutions are identified and agreed upon. The issue of enforceable and mandatory reliability standards was also discussed. 1 fig

  15. THE MAIN DIRECTIONS OF IMPROVING THE EFFICIENCY OF PRODUCTION, TRANSMISSION AND DISTRIBUTION OF ELECTRICAL ENERGY

    Directory of Open Access Journals (Sweden)

    I. V. Zhezhelenko

    2018-01-01

    Full Text Available The main directions of increase of efficiency of production, transmission and distribution of electric energy have been formulated. The relation between the values of electricity losses during transmission via power grids of different countries and the level of the economies of these countries characterized by the value of gross domestic product at purchasing power parity per capita has been established. In the countries with a gross domestic product at purchasing power parity per capita less than 20 thousand US dollars electricity losses during its transmission via power grids are 1.5–2.5 times more than the ones transmitted via power grids of the industrialized countries where the specified purchasing power parity is in the range of 30.4–54.5 thousand US dollars. In the countries with more developed economies the technical culture of production, transmission and distribution of electricity is higher; the modern control systems of operation modes of electrical networks are used as well as of monitoring and accounting of electricity; also there are solvent and disciplined consumers in such countries as well as clear regulatory framework and tariff regulation system. However, the process of transmission and distribution of electricity is effective if not only low relative losses take place, but the normal (contractual requirements for carrying capacity, quality and reliability of electricity supply are provided. The possibility of analytical determination of the optimum value of reserve capacity of power plants providing the required level of reliability of the power system has been considered.

  16. Swiss electrical power association

    International Nuclear Information System (INIS)

    1983-01-01

    Milestones of electrical power development in Switzerland during 1982 are quoted. An energy balance is shown for the utilisation of 864,630 terajoules of primary energy. This is related to global data on per capita power consumption. In the electricity generation section, annual load factors are given for the four nuclear stations. A brief review is made of hydro potential and monthly export/import figures for power to other countries (mostly export, especially in summer). Total electrical power output grew about 1.3% in the last year. Recent transmission line developments are noted, mostly 2x380kV, and including a link with Austria. In the financial section, consumer price indices are quoted for liquid and solid fuel, gas and electricity since 1966. Under administration, details are listed of the main and about 18 supporting Committees and working groups with special functions (e.g. tariffs, electrical vehicles). Public relations have included nuclear power press conferences, a mobile video unit, information leaflets for the media and a teaching seminar. (G.C.)

  17. SUPER-CAPACITOR APPLICATION IN ELECTRICAL POWER CABLE TESTING FACILITIES IN THERMAL ENDURANCE AND MECHANICAL BRACING TESTS

    Directory of Open Access Journals (Sweden)

    I. V. Oleksyuk

    2015-01-01

    Full Text Available The current-carrying cores of the electrical power cables should be resistant to effects of short-circuit currents whose values depend on the material of the core, its cross-sectional area, cable insulation properties, environment temperature, and the duration of the short-circuit current flow (1 and 3–4 sec. when tested for thermal endurance and mechanical bracing. The facilities for testing the 10 kV aluminum core cables with short-circuit current shall provide mechanical-bracing current 56,82 kA and thermal endurance current 11,16 kA. Although capacitors provide such values of the testing currents to the best advantage, utilizing conventional capacitor-units will involve large expenditures for erecting and  running a separate building. It is expedient to apply super-capacitors qua the electric power supply for testing facilities, as they are capacitors with double-electrical layer and involve the current values of tens of kilo-amperes.The insulation voltage during short-circuit current testing being not-standardized, it is not banned to apply voltages less than 10 kV when performing short-circuit thermal endurance and mechanical bracing tests for electrical power cables of 10 kV. The super-capacitor voltage variation-in-time graph consists of two regions: capacitive and resistive. The capacitive part corresponds to the voltage change consequent on the energy change in the super-capacitors. The resistive part shows the voltage variation due to the active resistance presence in the super-capacitor.The author offers the algorithm determining the number of super capacitors requisite for testing 10 kV-electrical power cables with short-circuit currents for thermal endurance and mechanical bracing. The paper shows that installation of super-capacitors in the facilities testing the cables with short-circuit currents reduces the area needed for the super-capacitors in comparison with conventional capacitors more than by one order of magnitude.

  18. Electric power system applications of optimization

    CERN Document Server

    Momoh, James A

    2008-01-01

    Introduction Structure of a Generic Electric Power System  Power System Models  Power System Control Power System Security Assessment  Power System Optimization as a Function of Time  Review of Optimization Techniques Applicable to Power Systems Electric Power System Models  Complex Power Concepts Three-Phase Systems Per Unit Representation  Synchronous Machine Modeling Reactive Capability Limits Prime Movers and Governing Systems  Automatic Gain Control Transmission Subsystems  Y-Bus Incorporating the Transformer Effect  Load Models  Available Transfer Capability  Illustrative Examples  Power

  19. Grounding modelling for transient overvoltage simulation in electric power transmission

    International Nuclear Information System (INIS)

    Moreno O, German; Valencia V, Jaime A; Villada, Fernando

    1992-01-01

    Grounding plays an important role in transmission line outages and consequently on electric energy transmission quality indexes. Fundamentals of an accurate modelling for transient behaviour analysis, particularly for the response of transmission lines to lightning, are presented. Also, a method to take into account the electromagnetic propagation guided by the grounding electrodes and finally to assess the grounding impedance in order to simulate the transmission line behaviour under lightning is presented. Analysis of impedance behaviour for diverse configurations and simulation results of over voltages on a real 220 kV line are presented to illustrate the capabilities of the method and of the computational program developed

  20. Impacts of rising air temperatures on electric transmission ampacity and peak electricity load in the United States

    Science.gov (United States)

    Bartos, Matthew; Chester, Mikhail; Johnson, Nathan; Gorman, Brandon; Eisenberg, Daniel; Linkov, Igor; Bates, Matthew

    2016-11-01

    Climate change may constrain future electricity supply adequacy by reducing electric transmission capacity and increasing electricity demand. The carrying capacity of electric power cables decreases as ambient air temperatures rise; similarly, during the summer peak period, electricity loads typically increase with hotter air temperatures due to increased air conditioning usage. As atmospheric carbon concentrations increase, higher ambient air temperatures may strain power infrastructure by simultaneously reducing transmission capacity and increasing peak electricity load. We estimate the impacts of rising ambient air temperatures on electric transmission ampacity and peak per-capita electricity load for 121 planning areas in the United States using downscaled global climate model projections. Together, these planning areas account for roughly 80% of current peak summertime load. We estimate climate-attributable capacity reductions to transmission lines by constructing thermal models of representative conductors, then forcing these models with future temperature projections to determine the percent change in rated ampacity. Next, we assess the impact of climate change on electricity load by using historical relationships between ambient temperature and utility-scale summertime peak load to estimate the extent to which climate change will incur additional peak load increases. We find that by mid-century (2040-2060), increases in ambient air temperature may reduce average summertime transmission capacity by 1.9%-5.8% relative to the 1990-2010 reference period. At the same time, peak per-capita summertime loads may rise by 4.2%-15% on average due to increases in ambient air temperature. In the absence of energy efficiency gains, demand-side management programs and transmission infrastructure upgrades, these load increases have the potential to upset current assumptions about future electricity supply adequacy.

  1. Investment in Electricity Generation and Transmission: Decision Making Under Uncertainty

    DEFF Research Database (Denmark)

    Conejo, Antonio J.; Baringo, Luis; Kazempour, Jalal

    This book provides an in-depth analysis of investment problems pertaining to electric energy infrastructure, including both generation and transmission facilities. The analysis encompasses decision-making tools for expansion planning, reinforcement, and the selection and timing of investment...... undergraduate and graduate students in the fields of electric energy systems, operations research, management science, and economics. Practitioners in the electric energy sector will also benefit from the concepts and techniques presented here....

  2. High Voltage Power Transmission for Wind Energy

    Science.gov (United States)

    Kim, Young il

    The high wind speeds and wide available area at sea have recently increased the interests on offshore wind farms in the U.S.A. As offshore wind farms become larger and are placed further from the shore, the power transmission to the onshore grid becomes a key feature. Power transmission of the offshore wind farm, in which good wind conditions and a larger installation area than an onshore site are available, requires the use of submarine cable systems. Therefore, an underground power cable system requires unique design and installation challenges not found in the overhead power cable environment. This paper presents analysis about the benefit and drawbacks of three different transmission solutions: HVAC, LCC/VSC HVDC in the grid connecting offshore wind farms and also analyzed the electrical characteristics of underground cables. In particular, loss of HV (High Voltage) subsea power of the transmission cables was evaluated by the Brakelmann's theory, taking into account the distributions of current and temperature.

  3. PROVIDING QUALITY OF ELECTRIC POWER IN ELECTRIC POWER SYSTEM IN PARALLEL OPERATION WITH WIND TURBINE

    Directory of Open Access Journals (Sweden)

    Yu. A. Rolik

    2016-01-01

    Full Text Available The problem of providing electric power quality in the electric power systems (EPS that are equipped with sufficiently long air or cable transmission lines is under consideration. This problem proved to be of particular relevance to the EPS in which a source of electrical energy is the generator of wind turbines since the wind itself is an instable primary energy source. Determination of the degree of automation of voltage regulation in the EPS is reduced to the choice of methods and means of regulation of power quality parameters. The concept of a voltage loss and the causes of the latter are explained by the simplest power system that is presented by a single-line diagram. It is suggested to regulate voltage by means of changing parameters of the network with the use of the method of reducing loss of line voltage by reducing its reactance. The latter is achieved by longitudinal capacitive compensation of the inductive reactance of the line. The effect is illustrated by vector diagrams of currents and voltages in the equivalent circuits of transmission lines with and without the use of longitudinal capacitive compensation. The analysis of adduced formulas demonstrated that the use of this method of regulation is useful only in the systems of power supply with a relatively low power factor (cosφ < 0.7 to 0.9. This power factor is typical for the situation of inclusion the wind turbine with asynchronous generator in the network since the speed of wind is instable. The voltage regulation fulfilled with the aid of the proposed method will make it possible to provide the required quality of the consumers’ busbars voltage in this situation. In is turn, it will make possible to create the necessary conditions for the economical transmission of electric power with the lowest outlay of reactive power and the lowest outlay of active power losses.

  4. Power Sales to Electric Utilities

    Energy Technology Data Exchange (ETDEWEB)

    None

    1989-02-01

    The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities interconnect with qualifying facilities and purchase electricity at a rate based upon their full avoided costs (i.e., costs of providing both capacity and energy). Qualifying facilities (QF) include solar or geothermal electric units, hydropower, municipal solid waste or biomass-fired power plants, and cogeneration projects that satisfy maximum size, fuel use, ownership, location, and/or efficiency criteria. In Washington State, neither standard power purchase prices based upon a proxy ''avoided plant'', standard contracts, or a standard offer process have been used. Instead, a variety of power purchase contracts have been negotiated by developers of qualifying facilities with investor-owned utilities, public utility districts, and municipally-owned and operated utilities. With a hydro-based system, benefits associated with resource acquisition are determined in large part by how compatible the resource is with a utility's existing generation mix. Power purchase rates are negotiated and vary according to firm energy production, guarantees, ability to schedule maintenance or downtime, rights of refusal, power plant purchase options, project start date and length of contract; front-loading or levelization provisions; and the ability of the project to provide ''demonstrated'' capacity. Legislation was also enacted which allows PURPA to work effectively. Initial laws established ownership rights and provided irrigation districts, PUDs, and municipalities with expanded enabling powers. Financial processes were streamlined and, in some cases, simplified. Finally, laws were passed which are designed to ensure that development proceeds in an environmentally acceptable manner. In retrospect, PURPA has worked well within Washington. In the state of Washington, 20 small-scale hydroelectric projects with a combined generating capacity of

  5. Maximal network reliability for a stochastic power transmission network

    International Nuclear Information System (INIS)

    Lin, Yi-Kuei; Yeh, Cheng-Ta

    2011-01-01

    Many studies regarded a power transmission network as a binary-state network and constructed it with several arcs and vertices to evaluate network reliability. In practice, the power transmission network should be stochastic because each arc (transmission line) combined with several physical lines is multistate. Network reliability is the probability that the network can transmit d units of electric power from a power plant (source) to a high voltage substation at a specific area (sink). This study focuses on searching for the optimal transmission line assignment to the power transmission network such that network reliability is maximized. A genetic algorithm based method integrating the minimal paths and the Recursive Sum of Disjoint Products is developed to solve this assignment problem. A real power transmission network is adopted to demonstrate the computational efficiency of the proposed method while comparing with the random solution generation approach.

  6. Estimating zonal electricity supply curves in transmission-constrained electricity markets

    International Nuclear Information System (INIS)

    Sahraei-Ardakani, Mostafa; Blumsack, Seth; Kleit, Andrew

    2015-01-01

    Many important electricity policy initiatives would directly affect the operation of electric power networks. This paper develops a method for estimating short-run zonal supply curves in transmission-constrained electricity markets that can be implemented quickly by policy analysts with training in statistical methods and with publicly available data. Our model enables analysis of distributional impacts of policies affecting operation of electric power grid. The method uses fuel prices and zonal electric loads to determine piecewise supply curves, identifying zonal electricity price and marginal fuel. We illustrate our methodology by estimating zonal impacts of Pennsylvania's Act 129, an energy efficiency and conservation policy. For most utilities in Pennsylvania, Act 129 would reduce the influence of natural gas on electricity price formation and increase the influence of coal. The total resulted savings would be around 267 million dollars, 82 percent of which would be enjoyed by the customers in Pennsylvania. We also analyze the impacts of imposing a $35/ton tax on carbon dioxide emissions. Our results show that the policy would increase the average prices in PJM by 47–89 percent under different fuel price scenarios in the short run, and would lead to short-run interfuel substitution between natural gas and coal. - Highlights: • We develop a method to estimate of zonal supply curves in electricity markets. • The model estimates zonal electricity prices and zonal fuel utilization. • The model implicitly captures the average impacts of transmission constraints. • Using the method, we project supply curves for the seventeen utility zones of PJM. • We use the estimated supply curves to study the impacts of Pennsylvania's Act 129 and a carbon tax of $35 per ton

  7. Essays on electricity transmission investment and financial transmission rights

    Science.gov (United States)

    Shang, Wenzhuo

    The U.S. electric power industry has been going through fundamental restructuring and realignment since the 1990's. Many issues and problems have emerged during the transition, and both economists and engineers have been looking for the solutions fervently. In this dissertation, which consists primarily of three essays, we apply economics theory and techniques to the power industry and address two related issues, transmission investment and financial transmission rights (FTRs). The first essay takes the decentralized perspective and investigates the efficiency attribute of market-based transmission investment under perfect competition. We clarify, for the first time, the nature of the externality created by loop flows that causes transmission investment to be inefficient. Our findings have important implications for better understanding of transmission market design and creating incentives for efficient transmission investment. In the second essay, we define several rules for allocating transmission investment cost within the framework of cooperative game theory. These rules provide fair, stable or efficient cost allocations in theory and are good benchmarks against which the allocation mechanism in practice can be compared and improved upon. In the last essay, we make exploratory efforts in analyzing and assessing empirically the performance of the Midwest independent system operator (MISO) FTR auction market. We reveal some stylized facts about this young market and find that it is not efficient under the risk-neutrality assumption. We also point out and correct the drawbacks in previous related work and suggest about more complete empirical work in future. In all, this dissertation makes both theoretic and empirical analysis of the two hot issues related to the power industry and comes up with findings that have important implications for the development of this industry.

  8. 76 FR 58101 - Electric Reliability Organization Interpretation of Transmission Operations Reliability Standard

    Science.gov (United States)

    2011-09-20

    ....C. Cir. 2009). \\4\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC... for maintaining real and reactive power balance. \\14\\ Electric Reliability Organization Interpretation...; Order No. 753] Electric Reliability Organization Interpretation of Transmission Operations Reliability...

  9. Development of 3 D Electric Field Analysis Program under Power System Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Myung, S. H.; Lee, K. C.; Lee, J. B.; Ha, T. H. [Korea Electrotechnology Research Institute, Changwon (Korea, Republic of)

    1996-12-01

    Recently, as the effects of electric fields on animals, human beings and sensitive equipment have been reported, the study on electric fields has become more important. Transmission lines and substation among power facilities are dominant parts related to electrical environment. Electric field analysis of transmission line has been made using image charge method or CSM since 1970`s, however electric field analysis in substation has been rarely studied due to the complexity of three dimensional evaluation of an electric field in substation. For the rather complicated and time-consuming three-dimensional electric field calculation in the vicinity of transmission lines and substations, this study proposes an effective numerical calculation method based on Charge Simulation Method(CSM). In order to represent non-uniform charge distribution on an electrode better, it is subdivided into small segments with linear charge density. Each segment with linear charge density can be easily represented by a generalized finite line type of charge whose expressions for potential and electric field were analytically derived and which was named {sup f}inite slant line charge in this study. As for the arrangement of small segments of a subdivided electrode, it has been found that unequally spaced arrangement method is superior to equally spaced one. In order to arrange segments fast and effectively, effective formulas were derived from multiple regression analysis of many simulations. The proposed method is applied to the electric field calculation around the transmission lines with significant change in direction and substation busbars. (author). refs., figs., tabs.

  10. Electric and magnetic field reduction by alternative transmission line options

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, J.R. (Power Technologies, Inc., Schenectady, NY (United States)); Dale, S.J. (Oak Ridge National Lab., TN (United States)); Klein, K.W. (Energetics, Inc., Columbia, MD (United States))

    1991-01-01

    Ground level electric, and more recently magnetic, fields from overhead power transmission lines are increasingly important considerations in right of way specification, with states setting or planning to set edge of right of way limits. Research has been conducted in high phase order power transmission wherein six of twelve phases are used to transmit power in less physical space and with reduced electrical environmental effects than conventional designs. The first magnetic field testing, as reported in this paper, has verified predictive methods for determination of magnetic fields from high phase order lines. Based on these analytical methods, field profiles have been determined for lines of different phase order of comparable power capacity. Potential advantages of high phase order as a means of field mitigation are discussed. 10 refs., 12 figs., 3 tabs.

  11. Navajo transmission project Draft Environmental Impact Statement (DEIS)

    International Nuclear Information System (INIS)

    1996-09-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to either the Mead or the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Comers area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Comers/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Alternatives considered include energy conservation and electric load management, new generation facilities, use of existing transmission systems, alternative transmission technologies, no action, and the proposed action. For the proposed action, several alternative routes and ancillary facility locations are addressed: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources, and the impact of the transmission line's presence on visual resources and land uses

  12. A Design of a 345-kV Electric Power Transmission Line Interlinking Ramu and Rouna Grids in Papua New Guinea

    Directory of Open Access Journals (Sweden)

    Sakato Francis

    2017-01-01

    Full Text Available According to PNG Power Limited (PPL, Papua New Guinea’s peak power demand is expected to increase from 210 MW in 2012 to 347 MW in 2026. Under the current state of the power sector in Papua New Guinea (PNG, it is critical to implement measures to cope with the increasing power demand to promote investment, economic growth, and ultimately to achieve poverty reduction through economic growth. One of the solutions identified to improve the reliability of PNG power systems and thus to meet the demand is to interconnect the major grids in the country so that the loads could be shared among them. This project embarks in designing a 345-kV electric power transmission line to interlink the Ramu and Rouna power grids of Papua New Guinea. The design is done by analysing all the necessary aspects of the transmission lines with in-depth calculations performed using MATHCAD software. This design is the basis for extra-high voltage (EHV transmission network in anticipation for the power generation and demand growth in PNG.

  13. Electrical Power Supply to Offshore Oil Installations by High Voltage Direct Current Transmission

    Energy Technology Data Exchange (ETDEWEB)

    Myhre, Joergen Chr.

    2001-07-01

    This study was initiated to investigate if it could be feasible to supply offshore oil installations in the North Sea with electrical power from land. A prestudy of alternative converter topologies indicated that the most promising solution would be to investigate a conventional system with reduced synchronous compensator rating. The study starts with a summary of the state of power supply to offshore installations today, and a short review of classical HVDC transmission. It goes on to analyse how a passive network without sources influences the inverter. The transmission, with its current controlled rectifier and large inductance, is simulated as a current source. Under these circumstances the analysis shows that the network frequency has to adapt in order to keep the active and reactive power balance until the controllers are able to react. The concept of firing angle for a thyristor is limited in a system with variable frequency, the actual control parameter is the firing delay time. Sensitivity analysis showed some astonishing consequences. The frequency rises both by an increase in the active and in the reactive load. The voltage falls by an increase in the active load, but rises by an increase in the inductive load. Two different control principles for the system of inverter, synchronous compensator and load are defined. The first takes the reference for the firing delay time from the fundamental voltage at the point of common coupling. The second takes the reference for the firing delay time from the simulated EMF of the synchronous compensator. Of these, the second is the more stable and should be chosen as the basis for a possible control system. Two simulation tools are applied. The first is a quasi-phasor model running on Matlab with Simulink. The other is a time domain model in KREAN. The time domain model is primarily used for the verification of the quasi-phasor model, and shows that quasi-phasors is still a valuable tool for making a quick analysis

  14. Study for wireless power transmission of nuclear robot system

    International Nuclear Information System (INIS)

    Kim, Jongseog

    2013-01-01

    Gasoline engine or electric motor is generally used for driving power of working. Gasoline tank is uncomfortable to carry. Battery capacity does not sustain long time working. Frequent moving back of robot to power charger or refueling tank is inconvenient. Long power cable connection occur winding problem if there are complex structures in walking way. We need some solution for continuous supply of robot energy at the free moving condition of robot. 'Wireless power transmission' is one of the solutions. Some experiment result to transmit wireless power to moving robot is described herein. To find possible wireless power transmission method for nuclear robot, wireless power transmission tests were performed. As result of these tests, it was confirmed that wireless power transmission by using dipole and mat type magnetic induction were possible. As result of flying robot experiment, it was realized that development of light weight core for receiver and wave reflection device for high directional transmitter are necessary for practical use of the dipole type wireless power transmission. Small size core and high directional transmitter will be next target. Mat type wireless power transmission is regarded as useful for robot power charging station in the inside containment

  15. Study for wireless power transmission of nuclear robot system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jongseog [Central Research Institute of Korea Hydro and Nuclear Power Co., Daejeon (Korea, Republic of)

    2013-05-15

    Gasoline engine or electric motor is generally used for driving power of working. Gasoline tank is uncomfortable to carry. Battery capacity does not sustain long time working. Frequent moving back of robot to power charger or refueling tank is inconvenient. Long power cable connection occur winding problem if there are complex structures in walking way. We need some solution for continuous supply of robot energy at the free moving condition of robot. 'Wireless power transmission' is one of the solutions. Some experiment result to transmit wireless power to moving robot is described herein. To find possible wireless power transmission method for nuclear robot, wireless power transmission tests were performed. As result of these tests, it was confirmed that wireless power transmission by using dipole and mat type magnetic induction were possible. As result of flying robot experiment, it was realized that development of light weight core for receiver and wave reflection device for high directional transmitter are necessary for practical use of the dipole type wireless power transmission. Small size core and high directional transmitter will be next target. Mat type wireless power transmission is regarded as useful for robot power charging station in the inside containment.

  16. Electrical energy in France in 2009

    International Nuclear Information System (INIS)

    2009-12-01

    The figures presented on this document account for the electricity flows recorded in Metropolitan France, including Corsica. Contents: national consumption; physical exchanges with foreign countries; electrical energy balance in France in 2009; net generation; noteworthy data for the year 2009 (daily maximum values of national consumption, thermal generation, hydro-electric generation, wind generation and balance of physical exchanges); electricity market: cross-borders contractual exchanges, balance responsible entities (Energy amount exchanged between balance responsible entities through the block exchange notifications), balancing mechanism (global amount of energy activated upwards and downwards), daily market coupling; power facilities: generating facilities in France (Nuclear, Fossil fuel thermal, Hydro-electric, Wind and Other renewable energy sources), transmission lines owned by RTE (circuit length in operation), transmission - transformers owned by RTE (installed capacity in operation); main transmission facilities commissioned during the year 2009 (substations connected to the RTE network and new or refurbished circuits)

  17. Electric power transmission and distribution in Germany - an NTPA success

    International Nuclear Information System (INIS)

    Staschus, K.

    2002-01-01

    The German Energy Law of April 1998 opened 100 percent of the German electricity market to competition without any transition phase. Over four years later, the degree of market opening is still ahead of that in many other European countries. Transition phases elsewhere have been dominated by the need to develop detailed rules not only for the functioning of the power markets - e.g. in power exchanges - but also for the transmission and distribution system operators and for the data exchange between market participants. Especially the data exchange needs for the handling of household customers switching suppliers has been a challenge in all the countries that have opened the household customer market. But also the network access fees on both transmission and distribution level are still being debated in many countries. The German governments have so far chosen to let the network operators develop the access rules, pricing rules and data exchange standards in intense - and intensely observed - negotiations with the network users. Important outcomes of such negotiations include the well-known A ssociations' Agreements , GridCode, DistributionCode, MeteringCode as well as the government's Best Practice Recommendations on data exchange standards for the switching between suppliers. One important advantage of this negotiation-based rather than regulatory approach is its speed and flexibility. For example, the Associations' Agreement on network access fees is now valid in its third version, and each successive version included important learning from the experience of both network operators and network users with the previous agreement. This paper will summarise the legal framework of the liberalised power market in Germany and focus on the current state of pricing rules in the Associations' Agreement, of well advanced comparisons run by VDN, of the network access fees of hundreds of distribution system operators including specific data on structural differences of their

  18. Electrical energy in France in 2008

    International Nuclear Information System (INIS)

    2008-12-01

    The figures presented on this document account for the electricity flows recorded in Metropolitan France, including Corsica. Contents: national consumption; physical exchanges with foreign countries; electrical energy balance in France in 2008; net generation; noteworthy data for the year 2008 (daily maximum values of National consumption, Hydroelectric generation and non-Hydroelectric generation, Balance of physical exchanges); electricity market: cross-border contractual exchanges, balance responsible entities (Energy amount exchanged between balance responsible entities through the block exchange notifications), balancing mechanism (Global amount of energy activated upwards and downwards); power facilities: generating facilities in France (Nuclear, Fossil fuel thermal, Hydro-electric, Wind and Other renewable energy sources), transmission lines (circuit length in operation), transmission - transformers (installed capacity in operation); main transmission facilities commissioned during the year 2008 (substations connected to the RTE network and new or refurbished circuits)

  19. Semiannual report for the period October 1, 1979-March 31, 1980 of work on: (1) superconducting power transmission system development; (2) cable insulation development. Power Transmission Project Technical Note No. 106

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-07

    Progress is reported in a program whose objective is to develop an underground superconducting power transmission system which is economical and technically attractive to the utility industry. The system would be capable of carrying very large blocks of electric power, and would supplant overhead lines in urban and suburban areas and regions of natural beauty. The program consisted initially of work in the laboratory to develop suitable materials, cryostats, and cable concepts. The materials work covers the development and testing of suitable superconductors and dielectric insulation. The laboratory work has now been extended to an outside test facility which represents an intermediate step between the laboratory scale and a full-scale system. The facility will allow cables several hundred feet long to be tested under realistic conditions. In addition, the refrigerator has been designed for optimum service for utility applications.

  20. Development of electric power transmission line anomaly approaching alarm system. Sodensen ijo sekkin keiho sochi no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    Kusaba, Masaro; Tabata, Takatoshi; Miyazaki, Shusuke [Kyushu Electric Power Co., Inc., Fukuoka (Japan)

    1989-03-30

    In order to plan preventive measures from the occurrence of electric power transmission line accident, a power transmission line anomaly approaching alarm system was developed to automatically alarm the operators and surveillants. The surveillance system, composed of camera, surveillance unit proper and alarm receiving portion, generates alarm and indicate hazard to the operators, when animal invades a hazardous area designated on the monitor. Wireless telegraph for the alarm transmission use used frequency around a 322MHz band with the Radio Ray law and preventive measures from noise, taken into consideration. The prototype is characterized by unnecessary ancillary fitting to the surveillance object, rare erroneous operations and high reliability. While the hazardous area can be simply designated, changed and released, as made by volume on the control panel. It is moreover easy to designate, as done by confirming the surveillance object on the display. It is also possible in multidimensional surveillance and easy to use on site. 7 figs.

  1. Evaluation of Electric Power Procurement Strategies by Stochastic Dynamic Programming

    Science.gov (United States)

    Saisho, Yuichi; Hayashi, Taketo; Fujii, Yasumasa; Yamaji, Kenji

    In deregulated electricity markets, the role of a distribution company is to purchase electricity from the wholesale electricity market at randomly fluctuating prices and to provide it to its customers at a given fixed price. Therefore the company has to take risk stemming from the uncertainties of electricity prices and/or demand fluctuation instead of the customers. The way to avoid the risk is to make a bilateral contact with generating companies or install its own power generation facility. This entails the necessity to develop a certain method to make an optimal strategy for electric power procurement. In such a circumstance, this research has the purpose for proposing a mathematical method based on stochastic dynamic programming and additionally considering the characteristics of the start-up cost of electric power generation facility to evaluate strategies of combination of the bilateral contract and power auto-generation with its own facility for procuring electric power in deregulated electricity market. In the beginning we proposed two approaches to solve the stochastic dynamic programming, and they are a Monte Carlo simulation method and a finite difference method to derive the solution of a partial differential equation of the total procurement cost of electric power. Finally we discussed the influences of the price uncertainty on optimal strategies of power procurement.

  2. The integrated North American electricity market : a bi-national model for securing a reliable supply of electricity

    International Nuclear Information System (INIS)

    Egan, T.

    2004-03-01

    The 50 million people who experienced the power blackout on August 14, 2003 in southern Ontario and the U.S. Midwest and Northeast understood how vital electricity is in our day-to-day lives, but they also saw the resiliency of the North American electricity system. More than 65 per cent of the power generation was restored to service within 12 hours and no damage was caused to the generation or transmission facilities. Although the interconnected North American electricity system is among the most reliable in the world, it is threatened by an aging infrastructure, lack of new generation and transmission to meet demand, and growing regulatory pressures. This report suggests that any measures that respond to the threat of ongoing reliability should be bi-national in scope due to the interconnected nature of the system. Currently, the market, regulatory and administrative systems are different in each country. The full engagement and cooperation of both Canada and the United States is important to ensure future cross-border trade and power reliability. The Canadian Electricity Association proposes the following 7 measures: (1) support an open debate on all the supply options available to meet growing power demands, (2) promote bi-national cooperation in the construction of new transmission capacity to ensure a reliable continental electricity system, (3) examine opportunities for bi-national cooperation for investment in advanced transmission technologies and transmission research and development, (4) promote new generation technology and demand-side measures to relieve existing transmission constraints and reduce the need for new transmission facilities, (5) endorse a self-governing international organization for developing and enforcing mandatory reliability standards for the electricity industry, (6) coordinate measures to promote critical infrastructure protection, and (7) harmonize U.S. and Canadian efforts to streamline or clarify regulation of electricity

  3. Electric power system basics for the nonelectrical professional

    CERN Document Server

    Blume, Steven W

    2016-01-01

    The second edition of Steven W. Blume’s bestseller provides a comprehensive treatment of power technology for the non-electrical engineer working in the electric power industry. This book aims to give non-electrical professionals a fundamental understanding of large interconnected electrical power systems, better known as the “Power Grid”, with regard to terminology, electrical concepts, design considerations, construction practices, industry standards, control room operations for both normal and emergency conditions, maintenance, consumption, telecommunications and safety. The text begins with an overview of the terminology and basic electrical concepts commonly used in the industry then it examines the generation, transmission and distribution of power. Other topics discussed include energy management, conservation of electrical energy, consumption characteristics and regulatory aspects to help readers understand modern electric power systems.

  4. Emergency power systems at nuclear power plants

    International Nuclear Information System (INIS)

    1982-01-01

    This Guide applies to nuclear power plants for which the total power supply comprises normal power supply (which is electric) and emergency power supply (which may be electric or a combination of electric and non-electric). In its present form the Guide provides general guidance for all types of emergency power systems (EPS) - electric and non-electric, and specific guidance (see Appendix A) on the design principles and the features of the emergency electric power system (EEPS). Future editions will include a second appendix giving specific guidance on non-electric power systems. Section 3 of this Safety Guide covers information on considerations that should be taken into account relative to the electric grid, the transmission lines, the on-site electrical supply system, and other alternative power sources, in order to provide high overall reliability of the power supply to the EPS. Since the nuclear power plant operator does not usually control off-site facilities, the discussion of methods of improving off-site reliability does not include requirements for facilities not under the operator's control. Sections 4 to 11 of this Guide provide information, recommendations and requirements that would apply to any emergency power system, be it electric or non-electric

  5. Electric power: liberalization in half-measure

    International Nuclear Information System (INIS)

    Pradel, P.

    1996-01-01

    The European directive about the electric power liberalization concerns only big consumers. These manufacturers have privileged relations with E.D.F. for long years with a very attractive price for the kilowatt hour. The change should not be very important, only more transparency in accounts and change in tariffs of power transmission: for example, a small electric power producer will be authorized to contest the buying price that E.D.F. imposes to him to transport the energy he produces. (N.C.)

  6. Electric power: Past, present, and future

    International Nuclear Information System (INIS)

    Schnetzer, H.

    1994-01-01

    When, at the turn of the century, public electric power supply facilities were created and in 1908, the electric power stations of the Swiss canton of Zurich (EKZ) were built, only a third of the communities in the Zurich area could boast about being the consumers of this new energy. But what did the first electrically powered devices and machines look like? This, and more, is presented in the ''electric power house'' in Burenwisen Glattfelden in the canton of Zurich. Besides a Kaplan turbine and a sample of the most interesting devices from the past and the present, the focus of the exhibition is on the presentation of the new and old sources of light. The EKZ are pleased to be able to present their ''electric power house'' to the public, providing a broad range of information on energy-related questions and the development of electric power supply. (orig.) [de

  7. A method for assessing occupational exposure to power-frequency magnetic fields for electricity generation and transmission workers

    International Nuclear Information System (INIS)

    Renew, D C; Cook, R F; Ball, M C

    2003-01-01

    A new method for assessing both current and historical occupational exposures to magnetic fields has been developed and used in health studies involving a cohort of electricity generation and transmission workers in England and Wales. The exposure values are derived by calculation from engineering and operational data about the power stations rather than from measurements. They are provided for each of 11 job categories for each year of operation of each power station represented in the cohort. The engineering data are used to determine the average magnetic fields in specified areas of work within the power station and then applied to information about the time spent in these areas by each of the job categories. The operational data are used to adjust the exposures for each year according to the power station output for the year. Earlier methods used measurements or the advice of panels of experts to provide exposure scores for a number of job categories across all power stations and years. Such methods were not able to distinguish exposures from different power facilities or during the different years of their operation. Measurement surveys at 10 power stations of the magnetic fields in the work areas gave confidence that the calculations were realistic. Exposure measurements on 215 workers at three power stations were compared in job groups with the exposures predicted by the method. The Pearson correlation coefficient was 0.86 and the slope and intercept of the line of best fit were 0.87 and 0.07 μT respectively. The method gives a good prediction of measured exposure and is being used for studies of occupational exposure to magnetic fields and leukaemia, and of cardiovascular disease, and a reanalysis of brain cancer

  8. Power Transmission by Optical Fibers for Component Inherent Communication

    Directory of Open Access Journals (Sweden)

    Michael Dumke

    2010-02-01

    Full Text Available The use of optical fibers for power transmission has been investigated intensely. An optically powered device combined with optical data transfer offers several advantages compared to systems using electrical connections. Optical transmission systems consist of a light source, a transmission medium and a light receiver. The overall system performance depends on the efficiency of opto-electronic converter devices, temperature and illumination dependent losses, attenuation of the transmission medium and coupling between transmitter and fiber. This paper will summarize the state of the art for optically powered systems and will discuss reasons for negative influences on efficiency. Furthermore, an outlook on power transmission by the use of a new technology for creating polymer optical fibers (POF via micro dispensing will be given. This technology is capable to decrease coupling losses by direct contacting of opto-electronic devices.

  9. Transmission Lines or Poles, Electric, Electric transmission lines locations provided to us from Kansas City Power and Light and City of Gardner only at this time. AIMS is working on getting other providers in area. Data is limited to CUE (Collaborative Utility Exchange) Participants and subc, Published in 2004, Johnson County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Transmission Lines or Poles, Electric dataset current as of 2004. Electric transmission lines locations provided to us from Kansas City Power and Light and City of...

  10. The development of electric power/energy trading in Norway

    International Nuclear Information System (INIS)

    Engebretsen, J.D.

    1992-01-01

    One of the main aims of the Norwegian government is to make the electric power market more effective. A new energy law has been passed and other initiatives have been taken which have altered the framework of the conditions for electricity production and sales in Norway. The proposition for trading electric power and the development of new policies for calculating transmission tariffs has been dealt with in addition to plans for the extent of the development of hydroelectric power. Norway is the world's sixth largest producer of hydroelectricity. The domestic supply of electricity is described as well as the nature of the reorganization of the transmission of electricity and Norwegian foreign trade proposals within this area. The government is interested in taxing with regard to production instead of on the power itself in order to stimulate better energy economy. It is important that this will have a neutral effect between export and domestic consumption when contract sales to abroad are initiated. A more efficient electric power market will profit Norwegian society. Statistical data are included. (AB)

  11. Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-06-23

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides

  12. Impacts on human health from the coal and nuclear fuel cycles and other technologies associated with electric power generation and transmission

    International Nuclear Information System (INIS)

    Radford, E.P.

    1980-07-01

    The report evaluates major public health impacts of electric power generation and transmission associated with the nuclear fuel cycle and with coal use. Only existing technology is evaluated. For the nuclear cycle, effects of future use of fuel reprocessing and long-term radioactive waste disposal are briefly considered. The health effects of concern are those leading to definable human disease and injury. Health effects are scaled to numbers of persons and activities associated with a nominal 1000-megawatt electric plant fueled by either option. Comparison of the total health effects to the general public shows that the health risks from the coal cycle are about 50 times greater than for the nuclear cycle (coal, 0.7-3.7 major health effects per 1000 MWe per year; nuclear, 0.03-0.05 per 1000 MWe per year). For workers, these rates are higher. No evidence is found that electrical transmission contributes any health effects to the general public, except when broken power lines come in contact with people

  13. Competition and power pooling in the electricity industry

    International Nuclear Information System (INIS)

    Jasinski, P.; Yarrow, G.; Fusaro, P.

    1995-01-01

    Two contributions to the debate on power pooling and competition in the electricity supply industry are presented. In the first, the situation in England and Wales where power pooling was introduced shortly before privatization is analysed. Pooling has existed for many years in the USA but as an inter-generator arrangement designed to optimize production and costs. The British system sought in addition to establish a spot market in which bulk buyers as well as bulk suppliers could participate. There are however obvious weaknesses in the pool as a competitive market and it is argued that a combination of pooling arrangements and longer-term bilateral supply contracts are more likely to offer the prospect of workably competitive and efficient outcomes. The second contribution discusses how competitive markets will evolve in the USA under the new regime of less onerous regulation heralded by the Energy Policy Act if 1992 and the emergence of electricity trading markets which followed. In particular, the proposal by the California Public Utility commission favouring a mandatory Poolco is examined. Poolco would operate the transmission grid and dispatch generating plants while the utilities would retain ownership of transmission facilities and be required to supply the pool. This is seen as representing only partial deregulation and not to be consistent with moves to further competition and encourage free markets. (U.K.)

  14. Navajo transmission project. Final Environmental Impact Statement (FEIS)

    International Nuclear Information System (INIS)

    1997-08-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Corners area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Corners/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Six alternatives were considered and include (1) energy conservation and electric load management, (2) new generation facilities, (3) use of existing transmission systems, (4) alternative transmission technologies, (5) no action, and (6) the proposed action. For the proposed action, the following alternative routes and ancillary facility locations are addressed in the EIS: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described, and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources; and the impact of the transmission line's presence on visual resources and land uses. Public comments on the draft EIS are addressed in this FEIS

  15. Analyzing the topological, electrical and reliability characteristics of a power transmission system for identifying its critical elements

    International Nuclear Information System (INIS)

    Zio, E.; Golea, L.R.

    2012-01-01

    The subject of this paper is the analysis of an electrical transmission system with the objective of identifying its most critical elements with respect to failures and attacks. The methodological approach undertaken is based on graph-theoretical (topological) network analysis. Four different perspectives of analysis are considered within the formalism of weighed networks, adding to the purely topological analysis of the system, the reliability and electrical characteristics of its components. In each phase of the analysis: i) a graph-theoretical representation is offered to highlight the structure of the most important system connections according to the particular characteristics examined (topological, reliability, electrical or electrical-reliability), ii) the classical degree index of a network node is extended to account for the different characteristics considered. The application of these concepts of analysis to an electrical transmission system of literature confirms the importance of different perspectives of analysis on such a critical infrastructure. - Highlights: ► We analyze a power system from topological, reliability and electrical perspectives. ► We rank critical components within a vulnerability assessment framework. ► We compute an extended degree to rank critical energy paths. ► We compare several analytical approaches and provide a table for choosing among them. ► We suggest network changes to increase the reliability of highly loaded energy paths.

  16. Our views on transmission policy

    International Nuclear Information System (INIS)

    Wellford, W.H.; Sutley, N.H.

    1990-01-01

    In this article the authors discuss the need for predictable and fair access to transmission facilities in order to ensure competitive generation of power. They propose that the Federal Energy Regulatory Commission should regulate transmission to prevent a utility from gaining a competitive advantage in electricity generation markets, the incorporation of transmission access into every bidding program under state jurisdiction, and requirement of transmission rates, terms and conditions for all in-state utilities be included in the request for proposal

  17. The electrical system of nuclear power plant

    International Nuclear Information System (INIS)

    Firman Silitonga; Gunarwan Prayitno

    2009-01-01

    In these system, electrical power system is supplied from two-offsite transmission system respective main transformer and house service transformer; and reserve transformer. The electrical load in these system consist of safety electrical system and non-safety electrical system, The safety electrical and non safety electrical systems consist of four 6,9 kV AC medium voltage bus and 480 V AC low voltage bus system. The DC power system consist of four safety 125 V DC power system and the two non-safety 125 DC power systems. The equipment in these electrical system is main turbine-generator; GTG safety; GTG alternate; uninterrupted power supply (UPS) and battery system. To protect electrical equipment and building to direct stroke and non direct stroke disturbances is installed netral grounding system and lightning protection and protection the personnel to touch-voltage is installed equipment grounding system and station grounding. The lightning arrester system is connected to station station grounding system. (author)

  18. Electric power distribution. Elektrische Energieverteilung

    Energy Technology Data Exchange (ETDEWEB)

    Fricke, H; Frohne, H; Vaske, P

    1982-01-01

    The first chapter on electric power supply networks discusses transmitting media, their characteristic values, and the dimensioning of electric lines and networks; cables are given particular attention. High-voltage d.c. transmission and reactive power compensation are discussed. The next chapter describes the calculation of short-circuits and earth leakages for various neutral circuits on the basis of symmetric components. The newly introduced mesh current method for complex calculation of electric networks makes use of the potential of pocket computers. Chapter 3 discusses protective devices, i.e. earth systems and electronic protection. The next two chapters describe switch gear and power plants, including recent technical changes. The final chapter, which discusses the electric power industry, has been rewritten and extended. Methods of calculation, e.g. annual cost and cash value, are applied to transmitting media and plants. There is an extensive appendix with characteristic values of cables and overhead lines, graphical symbols, distinguishing signs of wiring diagrams, a bibliography of books, DIN standards, VDE specifications, and formulas.

  19. Electric Power Generation, Transmission and Distribution (NAICS 2211)

    Science.gov (United States)

    Find EPA regulatory information for electrical utilities, including coal-fired power plants. Includes links to NESHAPs for RICE, stationary combustion engines, fossil fuel waste, cooling water, effluent guidelines. Find information on the MATS rule.

  20. Electric power in Canada 1993

    International Nuclear Information System (INIS)

    1994-01-01

    The electric power industry in Canada in 1993 is reviewed. Items discussed include: the international context of Canadian electricity; regulatory structures; electricity and the environment; electricity consumption; electricity generation; generating capacity and reserve; electricity trade; transmission; electric utility investment and financing; costing and pricing; electricity outlook; demand-side management; and non-utility generation. Information is appended on installed capacity and electrical energy consumption in Canada, installed generating capacity, conventional thermal capacity by principal fuel type, provincial electricity imports and exports, Canadian electricity exports by exporter and importer, generation capacity by type, installed generating capacity expansion in Canada by station, federal environmental standards and guidelines, and prices paid by major electric utilities for non-utility generation. 26 figs., 90 tabs

  1. Electric power development in the USSR

    International Nuclear Information System (INIS)

    Rudenko, Y.N.

    1993-01-01

    The generation of electric power in the USSR is based on the Unified Electric Power System (UEPS) whose network cover most of the habitable territory of the country. Therefore, the development of the UEPS governs the overall evolution of the electric power generation in the country. At present, eleven out of thirteen joint electric power systems, which supply electricity to most of the USSR, are operating within the UEPS. The total electric power generation in the country reached 1728 billion kWh in 1990, of which the UEPS supplied approximately 90%. About 70% of installed capacity of the UEPS is fossil-fuelled power plants, about 12 % is nuclear power plants, and about 18% is hydroelectric power plants. The system-forming grid of the UEPS is made up of transmission lines of 220, 330, 500 and 750 kV. The on-line supervisory control of the UEPS is achieved by four-level automated system of dispatch control (UEPS, joint electric power systems, regional electric power systems, electric power plants, substations,electric grid regions). The development and extension of the UEPS in the USSR ensure higher reliability and quality of electric power supply to end-users, combined with higher efficiency. The principal problem facing the UEPS are as follows: the need to ensure environmental protection and efficiency of the steam power plants; to improve the safety and efficiency of nuclear power plants. The solution to these problems will define the conditions of the UEPS development, as well as electric power systems of other countries, at least for the coming two decades. This paper characterizes the peculiarities of the UEPS development over the last 20 years, including the installed capacity structure and the system-forming electric power grid. Special attention is paid to the environmental problems related to functioning and development of the UEPS and to the means of their solution. (author)

  2. Optimal planning of the Nordic transmission system with 100% electric vehicle penetration of passenger cars by 2050

    International Nuclear Information System (INIS)

    Graabak, Ingeborg; Wu, Qiuwei; Warland, Leif; Liu, Zhaoxi

    2016-01-01

    This paper presents the optimal planning of the Nordic backbone transmission system with 100% electric vehicle penetration of passenger cars by 2050. Electric vehicles will play an important role in the future energy systems and can reduce the greenhouse gas emission from the transport sector. However, the electric vehicles will increase the electricity consumption and might induce congestions in the transmission systems. In order to deal with the electricity consumption increase from the electric vehicle integration into the power system and maximize the social welfare, the optimal investments of the Nordic transmission system are studied. Case studies were conducted using the market simulation model EMPS (Efi's multi-area power market simulator) and two electric vehicle charging scenarios: a spot price based scenario and a dumb charging scenario. The electric vehicle charging power is assumed to be 3.68 kW with 1 phase 16 A. The complete electrification of the private passenger fleet increases the yearly power demand in the Nordic region with ca 7.5%. The profitable increases in transmission capacities are highest for dumb charging, but are very low for both dumb and spot price based charging compared to a Reference case. - Highlights: • The electric vehicle distribution is done using population and car statistics. • The 100% penetration electric vehicle demand is obtained for Nordic countries. • The optimal investments in the Nordic transmission system with electric vehicles are studied.

  3. Superconducting power transmission: the perils and promise

    Energy Technology Data Exchange (ETDEWEB)

    Forsyth, E B

    1976-06-01

    The development of bulk electricity transmission systems must be considered in the light of changing growth rates, increasing resistances to ehv overhead transmission and the tendency to concentrate generation in fewer sites. Helium-cooled or superconducting cables possess technical characteristics which will make them suitable as utility network components for power transmission over distances of ten to several hundred miles. These properties are illustrated by considering two applications in existing electrical networks. The first is a 43 mile system to transmit 4800 MVA and the second is a potential application under study in Pennsylvania to transmit 10,000 MVA over a distance of 350 miles or so. Helium-cooled versions of these transmission systems were designed to permit technical and economic evaluations. The major groups and institutions throughout the world engaged in the development of helium-cooled cables are listed and aspects of the technical approaches are briefly described.

  4. An assessment of the adequacy of generation and transmission facilities to meet electricity needs in Ontario: From January 2002 to December 2011

    International Nuclear Information System (INIS)

    2001-01-01

    A ten year forecast of electric power generation and transmission capacity, covering the period 2002 to 2011, is provided. The assessment of the Independent Market Operator is that based on existing and proposed facilities, Ontario has a reliable supply of electricity for the next ten years under a wide variety of conditions, even without taking advantage of opportunities to improve the efficiency of the Ontario electricity market. The key assumptions underlying this forecast were a median growth scenario, with energy demand growing at 1.2 per cent per year, from 152 terawatt-hours in 2002 to 168 terrawatt-hours at the end of the forecast period. Median increase in peak demand is expected to rise from 23,700 MW to 26,000 MW at the end of the period. A low demand growth scenario (0.8 per cent ) and a high demand growth scenario (1.7 per cent) were also studied. Support from neighbouring systems was assumed to be limited to the magnitude of existing firm purchase contracts already identified by the IMO. The Pickering A units are assumed to be recommissioned in 2002 on schedule, but the two Bruce A units, also announced to be returning to service during the period, have not been included in the calculations. This forecast also estimates the collective impact of all proposed new generation projects that have been identified to the IMO. If all generation proposals are built and operated, the amount of generation that is exclusively gas fuelled would comprise about 21 per cent of all installed capacity by 2005. Another 6 per cent would be dual-fuelled with gas. It is the judgement of the IMO that the transmission interfaces studied are capable of supplying the various transmission zones under the generation and demand scenarios considered in this study. A major transmission addition , i.e. 1,250 MW high voltage direct current (HVDC) interconnection between Ontario and Quebec near Ottawa, will improve transfer capabilities between the two provinces. This interconnection

  5. Electric power in Canada, 1990

    International Nuclear Information System (INIS)

    1991-01-01

    This report reviews the structure of the electric power industry in Canada, describes the regulatory structures that are in place, and puts the Canadian electricity industry into an international context. It presents statistics on electricity generation and consumption, imports and exports, transmission, costs and pricing, and financing. It forecasts anticipated energy demands, generating capacity and actual generation, exports, fuel requirements, and expenditures. The impacts of demand-side management and non-utility generation are discussed. (82 tabs., 23 figs.)

  6. Electric power in Canada, 1989

    International Nuclear Information System (INIS)

    1991-01-01

    This report reviews the structure of the electric power industry in Canada, describes the regulatory structures that are in place, and puts the Canadian electricity industry into an international context. It presents statistics on electricity generation and consumption, imports and exports, transmission, costs and pricing, and financing. It forecasts anticipated energy demands, generating capacity and actual generation, exports, fuel requirements, and expenditures. The impacts of demand-side management and non-utility generation are discussed. (78 tabs., 27 figs.)

  7. Amelioration of Electrical Power Quality based on Modulated Power Filter Compensator

    Directory of Open Access Journals (Sweden)

    Karrar Hameed Kadhim

    2017-08-01

    Full Text Available This paper deals with the performance of modeling and implementation of Modulated Power Filter Compensator ( MPFC based on synchronous generator to enhance Electrical Power Quality (EPQ performance , rectification power factor , voltage fixity and decreasing transmission line losses for 300 km transmission line . In this paper (MPFC sketch attendants for intelligent network stability and optimum exploitation. The proposal Flexible AC Transmission Systems ( FACTS can be expanded to distributed renewable energy interface and exploitation systems and also will be easy to modify for voltage fixity, Achieve the required stability, perfect usage and Compensation requirements. MATLAB SIMLINK version R2009b were used as a model of (MPFC.

  8. Canby Area Service Project substation and associated transmission line

    International Nuclear Information System (INIS)

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ''environmental impact statement'' is not required

  9. Electric power transmission for a Hanford Nuclear Energy Center (HNEC)

    International Nuclear Information System (INIS)

    1975-09-01

    The major issues examined in the comparison of the DIST and HNEC transmission concepts are: (1) type of transmission to be employed and an assessment of its technical feasibility, (2) availability of rights-of-way, (3) economics, (4) environmental impact, and (5) overall reliability of the transmission system. The type of transmission selected for bulk power transfer from an HNEC for the time period studied is overhead AC, 500 kV double or single circuit, a voltage currently used in the PNW system. This type of system can accommodate growth up to at least 23,000 MW of thermal capacity at an HNEC. Significant additional transmountain capacity needs would require 1100 kV transmission, which should be technologically proved by the end of the 1970s. (auth)

  10. Transmission reliability faces future challenges

    International Nuclear Information System (INIS)

    Beaty, W.

    1993-01-01

    The recently published Washington International Energy Group's 1993 Electric Utility Outlook states that nearly one-third (31 percent) of U.S. utility executives expect reliability to decrease in the near future. Electric power system stability is crucial to reliability. Stability analysis determines whether a system will stay intact under normal operating conditions, during minor disturbances such as load fluctuations, and during major disturbances when one or more parts of the system fails. All system elements contribute to reliability or the lack of it. However, this report centers on the transmission segment of the electric system. The North American Electric Reliability Council (NERC) says the transmission systems as planned will be adequate over the next 10 years. However, delays in building new lines and increasing demands for transmission services are serious concerns. Reliability concerns exist in the Mid-Continent Area Power Pool and the Mid-America Interconnected Network regions where transmission facilities have not been allowed to be constructed as planned. Portions of the transmission systems in other regions are loaded at or near their limits. NERC further states that utilities must be allowed to complete planned generation and transmission as scheduled. A reliable supply of electricity also depends on adhering to established operating criteria. Factors that could complicate operations include: More interchange schedules resulting from increased transmission services. Increased line loadings in portions of the transmission systems. Proliferation of non-utility generators

  11. NSTX Electrical Power Systems

    International Nuclear Information System (INIS)

    A. Ilic; E. Baker; R. Hatcher; S. Ramakrishnan; et al

    1999-01-01

    The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physic Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. The design of the NSTX electrical power system was tailored to suit the available infrastructure and electrical equipment on site. Components were analyzed to verify their suitability for use in NSTX. The total number of circuits and the location of the NSTX device drove the major changes in the Power system hardware. The NSTX has eleven (11) circuits to be fed as compared to the basic three power loops for TFTR. This required changes in cabling to insure that each cable tray system has the positive and negative leg of cables in the same tray. Also additional power cabling had to be installed to the new location. The hardware had to b e modified to address the need for eleven power loops. Power converters had to be reconnected and controlled in anti-parallel mode for the Ohmic heating and two of the Poloidal Field circuits. The circuit for the Coaxial Helicity Injection (CHI) System had to be carefully developed to meet this special application. Additional Protection devices were designed and installed for the magnet coils and the CHI. The thrust was to making the changes in the most cost-effective manner without compromising technical requirements. This paper describes the changes and addition to the Electrical Power System components for the NSTX magnet systems

  12. Economic assessment group on power transmission and distribution networks tariffs

    International Nuclear Information System (INIS)

    2000-06-01

    Facing the new law on the electric power market liberalization, the french government created an experts group to analyze solutions and assessment methods of the electrical networks costs and tariffs and to control their efficiency. This report presents the analysis and the conclusions of the group. It concerns the three main subjects: the regulation context, the tariffing of the electric power transmission and distribution (the cost and efficiency of the various options) and the tariffing of the electric power supply to the eligible consumers. The authors provide a guideline for a tariffing policy. (A.L.B.)

  13. Wireless Power Transmission via Sheet Medium Using Automatic Phase Adjustment of Multiple Inputs

    Science.gov (United States)

    Matsuda, Takashi; Oota, Toshifumi; Kado, Youiti; Zhang, Bing

    The wireless power transmission via sheet medium is a novel physical form of communication that utilizes the surface as a medium to provide both data and power transmission services. To efficiently transmit a relatively-large amount of electric power (several watts), we have developed a wireless power transmission system via sheet medium that concentrates the electric power on a specific spot by using phase control of multiple inputs. However, to find the optimal phases of the multiple inputs making the microwave converge on a specific spot in the sheet medium, the prior knowledge of the device's position, and the pre-experiment measuring the output power, are needed. In wireless communication area, it is known that the retrodirective array scheme can efficiently transmit the power in a self-phasing manner, which uses the pilot signals sent by the client devices. In this paper, we apply the retrodirective array scheme to the wireless power transmission system via sheet medium, and propose a power transmission scheme using the phase-adjustment of multiple inputs. To confirm the effectiveness of the proposal scheme, we evaluate its performance by computer simulation and realistic measurement. Both results show that the proposal scheme can achieve the retrodirectivity over the wireless power transmission via sheet medium.

  14. Transmission and distribution electrical engineering

    CERN Document Server

    Bayliss, Colin

    2003-01-01

    This comprehensive treatment of the theory and practice encountered in the installation and design of transmission and distribution systems for electrical power has been updated and revised to provide the project engineer with all the latest, relevant information to design and specify the correct system for a particular application.Thoroughly updated and revised to include latest developmentsLearn from and Author with extensive experience in managing international projectsFind out the reasoning and implicatons behind the different specifications and methods

  15. Wireless power transfer for electric vehicle

    OpenAIRE

    Mude, Kishore Naik

    2015-01-01

    Wireless Power Transfer (WPT) systems transfer electric energy from a source to a load without any wired connection. WPTs are attractive for many industrial applications because of their advantages compared to the wired counterpart, such as no exposed wires, ease of charging, and fearless transmission of power in adverse environmental conditions. Adoption of WPTs to charge the on-board batteries of an electric vehicle (EV) has got attention from some companies, and efforts are being made for ...

  16. Electric utilities deregulation and its impact on nuclear power generating stations

    International Nuclear Information System (INIS)

    Trehan, N.K.

    1998-01-01

    Under restructuring and deregulation, it is not clear as to who would have the responsibility, and what obligations the market participants would have to ensure that the electrical system reliability (stability) is maintained. Due to the dynamic nature of the electrical grid, especially with the implementation of restructuring and deregulation, vulnerabilities exist which may impact the reliability (stability) of the offsite electrical power system. In a nuclear power generating unit, an offsite electric power system and an onsite electric power system are required to permit the functioning of structures, systems, and components which are important to safety. The safety function for each system is to provide sufficient capacity and capability to assure that the containment integrity is maintained during power operation or in the event of a postulated accident. Analyses performed by the applicants must verify that the electrical grid remains stable in the event of a loss of the nuclear unit generator, the largest other unit on the grid or the most critical transmission line. The stability of the electric grid is assumed in the safety analyses and a change in it would impact those analyses. However, it may impact the availability of a stable electric power to the safety buses because of the limited number of available transmission lines. This paper discusses electrical power generation and demand, reserve margins, power transfer capability, development of new innovative technologies to compensate for lack of the construction of transmission lines, legislation for the formulation of a self regulation organization (SRO), grid disturbances that may lead to a voltage collapse, and the vulnerabilities which may impact the availability of a stable power to the nuclear power generating stations

  17. Optimization of output power and transmission efficiency of magnetically coupled resonance wireless power transfer system

    Science.gov (United States)

    Yan, Rongge; Guo, Xiaoting; Cao, Shaoqing; Zhang, Changgeng

    2018-05-01

    Magnetically coupled resonance (MCR) wireless power transfer (WPT) system is a promising technology in electric energy transmission. But, if its system parameters are designed unreasonably, output power and transmission efficiency will be low. Therefore, optimized parameters design of MCR WPT has important research value. In the MCR WPT system with designated coil structure, the main parameters affecting output power and transmission efficiency are the distance between the coils, the resonance frequency and the resistance of the load. Based on the established mathematical model and the differential evolution algorithm, the change of output power and transmission efficiency with parameters can be simulated. From the simulation results, it can be seen that output power and transmission efficiency of the two-coil MCR WPT system and four-coil one with designated coil structure are improved. The simulation results confirm the validity of the optimization method for MCR WPT system with designated coil structure.

  18. Integrated Computing, Communication, and Distributed Control of Deregulated Electric Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Bajura, Richard; Feliachi, Ali

    2008-09-24

    Restructuring of the electricity market has affected all aspects of the power industry from generation to transmission, distribution, and consumption. Transmission circuits, in particular, are stressed often exceeding their stability limits because of the difficulty in building new transmission lines due to environmental concerns and financial risk. Deregulation has resulted in the need for tighter control strategies to maintain reliability even in the event of considerable structural changes, such as loss of a large generating unit or a transmission line, and changes in loading conditions due to the continuously varying power consumption. Our research efforts under the DOE EPSCoR Grant focused on Integrated Computing, Communication and Distributed Control of Deregulated Electric Power Systems. This research is applicable to operating and controlling modern electric energy systems. The controls developed by APERC provide for a more efficient, economical, reliable, and secure operation of these systems. Under this program, we developed distributed control algorithms suitable for large-scale geographically dispersed power systems and also economic tools to evaluate their effectiveness and impact on power markets. Progress was made in the development of distributed intelligent control agents for reliable and automated operation of integrated electric power systems. The methodologies employed combine information technology, control and communication, agent technology, and power systems engineering in the development of intelligent control agents for reliable and automated operation of integrated electric power systems. In the event of scheduled load changes or unforeseen disturbances, the power system is expected to minimize the effects and costs of disturbances and to maintain critical infrastructure operational.

  19. Wireless power transmission using ultrasonic guided waves

    International Nuclear Information System (INIS)

    Kural, A; Pullin, R; Featherston, C; Holford, K; Paget, C

    2011-01-01

    The unavailability of suitable power supply at desired locations is currently an important obstacle in the development of distributed, wireless sensor networks for applications such as structural health monitoring of aircraft. Proposed solutions range from improved batteries to energy harvesting from vibration, temperature gradients and other sources. A novel approach is being investigated at Cardiff University School of Engineering in cooperation with Airbus. It aims to utilise ultrasonic guided Lamb waves to transmit energy through the aircraft skin. A vibration generator is to be placed in a location where electricity supply is readily available. Ultrasonic waves generated by this device will travel through the aircraft structure to a receiver in a remote wireless sensor node. The receiver will convert the mechanical vibration of the ultrasonic waves back to electricity, which will be used to power the sensor node. This paper describes the measurement and modelling of the interference pattern which emerges when Lamb waves are transmitted continuously as in this power transmission application. The discovered features of the pattern, such as a large signal amplitude variation and a relatively high frequency, are presented and their importance for the development of a power transmission system is discussed.

  20. Wireless power transmission using ultrasonic guided waves

    Energy Technology Data Exchange (ETDEWEB)

    Kural, A; Pullin, R; Featherston, C; Holford, K [School of Engineering, Cardiff University, Queens Buildings, The Parade, Cardiff CF24 2AA (United Kingdom); Paget, C, E-mail: kurala@cardiff.ac.uk [Airbus Operations Ltd, New Filton Road, BS99 7AR Bristol (United Kingdom)

    2011-07-19

    The unavailability of suitable power supply at desired locations is currently an important obstacle in the development of distributed, wireless sensor networks for applications such as structural health monitoring of aircraft. Proposed solutions range from improved batteries to energy harvesting from vibration, temperature gradients and other sources. A novel approach is being investigated at Cardiff University School of Engineering in cooperation with Airbus. It aims to utilise ultrasonic guided Lamb waves to transmit energy through the aircraft skin. A vibration generator is to be placed in a location where electricity supply is readily available. Ultrasonic waves generated by this device will travel through the aircraft structure to a receiver in a remote wireless sensor node. The receiver will convert the mechanical vibration of the ultrasonic waves back to electricity, which will be used to power the sensor node. This paper describes the measurement and modelling of the interference pattern which emerges when Lamb waves are transmitted continuously as in this power transmission application. The discovered features of the pattern, such as a large signal amplitude variation and a relatively high frequency, are presented and their importance for the development of a power transmission system is discussed.

  1. Ministry of ordinance determining the technical standard concerning atomic energy facilities for power generation

    International Nuclear Information System (INIS)

    1985-01-01

    The ministerial ordinance provides for the technical standards for the power generation of nuclear facilities; i.e., electric power facilities generating electricity with nuclear energy for motive power, according to the Electricity Enterprises Act. The contents are as follows: protection against fires, aseismatic design, radiation protective barriers, structural protection for sitings, reactor installation, safety measures, materials and structures, safety valves, pressure resistance tests, reactor core, radiation shields, reactor cooling, emergency core cooling system, facility equipment, alarm system, reactor control system, reactor control room, fuel storage facility, fuel handling facility, ventilation equipment, radioactive contamination prevention, radioactive waste management facility, reactor containment facility, and so on. (Kubozono, M.)

  2. Development on power distribution technologies of four electric power companies in Japan. The Kansai Electric Power Co. , Inc

    Energy Technology Data Exchange (ETDEWEB)

    1989-07-01

    Since dependency upon electric power has been rising yearly with the development of industry and the progress of information-oriented society, various kinds of technical development are needed to supply electricity. Furthermore, amenity of people's living has been highly intended, and life style has varied. Consequently, customers' needs for energy including related services have varied remarkably, and each customer has selected energy more subjectively from the wide range of viewpoint such as reliability, handiness, cleanliness, safety, and economic efficiency. In such situation, the power distribution section of Kansai Electric Power settled four themes for major technical development and has been promoting them. Four themes are as follows; to develop a total automation system for power distribution, to promote 20kV/400V-class power distribution, to develop techniques to form facilities harmonizing with local amenity, and to make business management efficient with the advanced NC system. 3 figs., 4 tabs.

  3. First Annual Progress Report on Transmission of Information by Acoustic Communication along Metal Pathways in Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Heifetz, A. [Argonne National Lab. (ANL), Argonne, IL (United States). Nuclear Engineering Division; Bakhtiari, S. [Argonne National Lab. (ANL), Argonne, IL (United States). Nuclear Engineering Division; Huang, X. [Argonne National Lab. (ANL), Argonne, IL (United States). Nuclear Engineering Division; Ponciroli, R. [Argonne National Lab. (ANL), Argonne, IL (United States). Nuclear Engineering Division; Vilim, R. B. [Argonne National Lab. (ANL), Argonne, IL (United States). Nuclear Engineering Division

    2017-09-30

    The objective of this project is to develop and demonstrate methods for transmission of information in nuclear facilities by acoustic means along existing in-place metal piping infrastructure. Pipes are omnipresent in a nuclear facility, and penetrate enclosures and partitions, such as the containment building wall. In the envisioned acoustic communication (AC) system, packets of information will be transmitted as guided acoustic waves along pipes. Performance of AC hardware and network protocols for efficient and secure communications under development in this project will be eventually evaluated in a representative nuclear power plant environment. Research efforts in the first year of this project have been focused on identification of appropriate transducers, and evaluation of their performance for information transmission along nuclear-grade metallic pipes. COMSOL computer simulations were performed to study acoustic wave generation, propagation, and attenuation on pipes. An experimental benchtop system was used to evaluate signal attenuation and spectral dispersion using piezo-electric transducers (PZTs) and electromagnetic acoustic transducers (EMATs). Communication protocols under evaluation consisted on-off keying (OOK) signal modulation, in particular amplitude shift keying (ASK) and phase shift keying (PSK). Tradeoffs between signal power and communication data rate were considered for ASK and PSK coding schemes.

  4. Electric power in Canada 1993

    International Nuclear Information System (INIS)

    1994-01-01

    The electric power industry in Canada in 1993 is reviewed. Items discussed include: the international context of Canadian electricity; regulatory structures; electricity and the environment; electricity consumption; electricity generation; generating capacity and reserve; electricity trade; transmission; electric utility investment and financing; costing and pricing; electricity outlook; demand-side management; and non-utility generation. Appended information is presented on installed capacity and electrical energy consumption in Canada, installed generating capacity, conventional thermal capacity by principal fuel type, provincial electricity imports and exports, Canadian electricity exports by exporter and importer, generation capacity by type, installed generating capacity expansion in Canada by station, federal environmental standards and guidelines, and prices paid by major electric utilities for non-utility generation. 23 figs., 95 tabs

  5. Electric power in Canada 1992

    International Nuclear Information System (INIS)

    1993-01-01

    The electric power industry in Canada in 1991 is reviewed. Items discussed include: the international context of Canadian electricity; regulatory structures; electricity and the environment; electricity consumption; electricity generation; generating capacity and reserve; electricity trade; transmission; electric utility investment and financing; costing and pricing; electricity outlook; demand-side management; and non-utility generation. Appended information is presented on installed capacity and electrical energy consumption in Canada, installed generating capacity, conventional thermal capacity by principal fuel type, provincial electricity imports and exports, Canadian electricity exports by exporter and importer, generation capacity by type, installed generating capacity expansion in Canada by station, federal environmental standards and guidelines, and prices paid by major electric utilities for non-utility generation. 26 figs., 90 tabs

  6. An agent-based analysis of the German electricity market with transmission capacity constraints

    International Nuclear Information System (INIS)

    Veit, Daniel J.; Weidlich, Anke; Krafft, Jacob A.

    2009-01-01

    While some agent-based models have been developed for analyzing the German electricity market, there has been little research done on the emerging issue of intra-German congestion and its effects on the bidding behavior of generator agents. Yet, studies of other markets have shown that transmission grid constraints considerably affect strategic behavior in electricity markets. In this paper, the implications of transmission constraints on power markets are analyzed for the case of Germany. Market splitting is applied in the case of congestion in the grid. For this purpose, the agent-based modeling of electricity systems (AMES) market package developed by Sun and Tesfatsion is modified to fit the German context, including a detailed representation of the German high-voltage grid and its interconnections. Implications of transmission constraints on prices and social welfare are analyzed for scenarios that include strategic behavior of market participants and high wind power generation. It can be shown that strategic behavior and transmission constraints are inter-related and may pose severe problems in the future German electricity market.

  7. An agent-based analysis of the German electricity market with transmission capacity constraints

    Energy Technology Data Exchange (ETDEWEB)

    Veit, Daniel J.; Weidlich, Anke; Krafft, Jacob A. [University of Mannheim, Dieter Schwarz Chair of Business Administration, E-Business and E-Government, 68131 Mannheim (Germany)

    2009-10-15

    While some agent-based models have been developed for analyzing the German electricity market, there has been little research done on the emerging issue of intra-German congestion and its effects on the bidding behavior of generator agents. Yet, studies of other markets have shown that transmission grid constraints considerably affect strategic behavior in electricity markets. In this paper, the implications of transmission constraints on power markets are analyzed for the case of Germany. Market splitting is applied in the case of congestion in the grid. For this purpose, the agent-based modeling of electricity systems (AMES) market package developed by Sun and Tesfatsion is modified to fit the German context, including a detailed representation of the German high-voltage grid and its interconnections. Implications of transmission constraints on prices and social welfare are analyzed for scenarios that include strategic behavior of market participants and high wind power generation. It can be shown that strategic behavior and transmission constraints are inter-related and may pose severe problems in the future German electricity market. (author)

  8. Optimal transmission planning under the Mexican new electricity market

    International Nuclear Information System (INIS)

    Zenón, Eric; Rosellón, Juan

    2017-01-01

    This paper addresses electricity transmission planning under the new industry and institutional structure of the Mexican electricity market, which has engaged in a deep reform process after decades of a state-owned-vertically-integrated-non-competitive-closed industry. Under this new structure, characterized by a nodal pricing system and an independent system operator (ISO), we analyze welfare-optimal network expansion with two modeling strategies. In a first model, we propose the use of an incentive price-cap mechanism to promote the expansion of Mexican networks. In a second model, we study centrally-planned grid expansion in Mexico by an ISO within a power-flow model. We carry out comparisons of these models which provide us with hints to evaluate the actual transmission planning process proposed by Mexican authorities (PRODESEN). We obtain that the PRODESEN plan appears to be a convergent welfare-optimal planning process. - Highlights: • We model transmission planning (PRODESEN) in the Mexican new electricity market. • We propose a first model with a price-cap mechanism to promote network expansion. • In a second power-flow model, we study centrally-planned grid expansions. • The PRODESEN appears to be a convergent welfare-optimal planning process. • Incentive regulation could further help to implement such an optimal process.

  9. The Cost-Optimal Distribution of Wind and Solar Generation Facilities in a Simplified Highly Renewable European Power System

    Science.gov (United States)

    Kies, Alexander; von Bremen, Lüder; Schyska, Bruno; Chattopadhyay, Kabitri; Lorenz, Elke; Heinemann, Detlev

    2016-04-01

    The transition of the European power system from fossil generation towards renewable sources is driven by different reasons like decarbonisation and sustainability. Renewable power sources like wind and solar have, due to their weather dependency, fluctuating feed-in profiles, which make their system integration a difficult task. To overcome this issue, several solutions have been investigated in the past like the optimal mix of wind and PV [1], the extension of the transmission grid or storages [2]. In this work, the optimal distribution of wind turbines and solar modules in Europe is investigated. For this purpose, feed-in data with an hourly temporal resolution and a spatial resolution of 7 km covering Europe for the renewable sources wind, photovoltaics and hydro was used. Together with historical load data and a transmission model , a simplified pan-European power power system was simulated. Under cost assumptions of [3] the levelized cost of electricity (LCOE) for this simplified system consisting of generation, consumption, transmission and backup units is calculated. With respect to the LCOE, the optimal distribution of generation facilities in Europe is derived. It is shown, that by optimal placement of renewable generation facilities the LCOE can be reduced by more than 10% compared to a meta study scenario [4] and a self-sufficient scenario (every country produces on average as much from renewable sources as it consumes). This is mainly caused by a shift of generation facilities towards highly suitable locations, reduced backup and increased transmission need. The results of the optimization will be shown and implications for the extension of renewable shares in the European power mix will be discussed. The work is part of the RESTORE 2050 project (Wuppertal Institute, Next Energy, University of Oldenburg), that is financed by the Federal Ministry of Education and Research (BMBF, Fkz. 03SFF0439A). [1] Kies, A. et al.: Kies, Alexander, et al

  10. Hearing in the matter of an application by Erie Shores Wind Farm Limited Partnership for an Order granting leave to construct transmission facilities to connect a wind farm to the transmission facilities of Hydro One Network Inc.[In the matter of the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, Schedule B

    Energy Technology Data Exchange (ETDEWEB)

    Kaiser, G.; Vlahos, P.; Betts, B.

    2005-06-20

    This document presents the transcripts of an Ontario Energy Board hearing regarding an application filed by Erie Shores Wind Farm Limited to construct transmission facilities that will connect Erie Shores' wind farm on the north shore of Lake Erie to the transmission facilities of Hydro One Network. This document presents the examinations by representatives of the Board Counsel, Erie Shores Wind Farm Limited Partnership, Hydro One Networks Inc., Ontario's Independent Electricity System Operator and intervenors. Erie Shores is a limited partnership between AIM PowerGen Corporation and Clean Power Income Fund. The proposed wind farm is to be located along the north shore of Lake Erie, covering about 14,000 acres of farmland in the townships of Bayham, Malahide and Norfolk County. It consists of 66 wind turbines with a net output of 99 MW. The construction of transmission facilities would involve the construction of a new transformer station with a 34.5/115 kV transformer, a capacitor bank, switch gear, and space for a future transformer. It would also include a transmission line from the Port Burwell transmission station to Hydro One's circuits at Cranberry Junction near Tillsonburg. Erie Shores also proposes to construct 27 km of the transmission line within the existing Otter Valley utility corridor, 3 km along the active Canadian Pacific Rail corridor, and over certain private lands located south of Tillsonburg Junction. Erie Shores was one of the successful bidders that has entered into a 20-year renewable energy supply contract with the Ontario Electricity Financial Corporation. The Board considers that the project is in the public interest and granted approval for the project, subject to certain conditions regarding communications, monitoring and reporting requirements. 2 refs., 1 appendix.

  11. Impact of GB transmission charging on renewable electricity generation

    International Nuclear Information System (INIS)

    2006-01-01

    The Government is committed to meeting its objective of producing 10% of UK electricity supplies from renewable sources by 2010, subject to the cost to the consumer being acceptable. It is generally believed that northern Scotland - and the Highlands and Islands in particular - will be a significant source of renewable energy in future, mostly in the form of wind power; wave and tidal energy may also be important. The National Grid Company (NGC) is responsible for formulating a cost-reflective and. non-discriminatory electricity transmission charging methodology for Great Britain (GB). This determines Transmission Network Use of System (TNUoS) tariffs, which are paid by transmission-connected generators and suppliers for the use of the high voltage transmission network. Following the publication of National Grid Company's 'GB Transmission Charging: Initial Thoughts' document on 16 December 2003, there was particular concern that the level of future Transmission Network Use of System (TNUoS) tariffs in northern Scotland might impede the achievement of the Government's 2010 target for renewable electricity supplies. That document and subsequent revisions indicate that generation TNUoS charges in northern Scotland were likely to be significantly higher than anywhere else in GB. The study attempts to quantify the effect of the proposed GB-wide TNUoS charging methodology on the future growth of renewable electricity so as to ascertain the impact on the likelihood of meeting the Government's 2010 target. (UK)

  12. Advanced electrical power system technology for the all electric aircraft

    Science.gov (United States)

    Finke, R. C.; Sundberg, G. R.

    1983-01-01

    The application of advanced electric power system technology to an all electric airplane results in an estimated reduction of the total takeoff gross weight of over 23,000 pounds for a large airplane. This will result in a 5 to 10 percent reduction in direct operating costs (DOC). Critical to this savings is the basic electrical power system component technology. These advanced electrical power components will provide a solid foundation for the materials, devices, circuits, and subsystems needed to satisfy the unique requirements of advanced all electric aircraft power systems. The program for the development of advanced electrical power component technology is described. The program is divided into five generic areas: semiconductor devices (transistors, thyristors, and diodes); conductors (materials and transmission lines); dielectrics; magnetic devices; and load management devices. Examples of progress in each of the five areas are discussed. Bipolar power transistors up to 1000 V at 100 A with a gain of 10 and a 0.5 microsec rise and fall time are presented. A class of semiconductor devices with a possibility of switching up to 100 kV is described. Solid state power controllers for load management at 120 to 1000 V and power levels to 25 kW were developed along with a 25 kW, 20 kHz transformer weighing only 3.2 kg. Previously announced in STAR as N83-24764

  13. Advanced electrical power system technology for the all electric aircraft

    Science.gov (United States)

    Finke, R. C.; Sundberg, G. R.

    1983-01-01

    The application of advanced electric power system technology to an all electric airplane results in an estimated reduction of the total takeoff gross weight of over 23,000 pounds for a large airplane. This will result in a 5 to 10 percent reduction in direct operating costs (DOC). Critical to this savings is the basic electrical power system component technology. These advanced electrical power components will provide a solid foundation for the materials, devices, circuits, and subsystems needed to satisfy the unique requirements of advanced all electric aircraft power systems. The program for the development of advanced electrical power component technology is described. The program is divided into five generic areas: semiconductor devices (transistors, thyristors, and diodes); conductors (materials and transmission lines); dielectrics; magnetic devices; and load management devices. Examples of progress in each of the five areas are discussed. Bipolar power transistors up to 1000 V at 100 A with a gain of 10 and a 0.5 microsec rise and fall time are presented. A class of semiconductor devices with a possibility of switching up to 100 kV is described. Solid state power controllers for load management at 120 to 1000 V and power levels to 25 kW were developed along with a 25 kW, 20 kHz transformer weighing only 3.2 kg.

  14. An annotated bibliography: social and economic factors associated with electric power generation 1978. Report for 1970-78

    International Nuclear Information System (INIS)

    Nakamura, S.

    1978-01-01

    A selective, annotated bibliography is presented concerning the socioeconomic impacts associated with electric power generation and related energy facilities. Abstracts were taken from studies, tables and figures in environmental reports and impact statements prepared by the energy industry, their consultants and regulatory agencies in connection with licensing and environmental requirements. The majority of the citations cover planned and operating nuclear and coal-fired steam electric generating stations and their associated transmission lines. Also included are citations covering other parts of the fossil and nuclear fuel cycles, such as mines and mills, fuel transportation and the breeder reactor. The bibliography is arranged by types of impacts including direct and indirect benefits of electricity production and transmission and internal and external costs. A state index and an author sponsor and plant name index are provided

  15. Fitting of power generated by nuclear power plants into the Hungarian electricity system

    International Nuclear Information System (INIS)

    Lengyel, Gyula; Potecz, Bela

    1984-01-01

    The moderate increase of electrical energy demands (3% at present) can only be met by the parallel application of fossil and nuclear power plants and by electric power import via the transmission lines of the CMEA countries. The changes in the electrical energy and fuel demands and the development of the available capacities during the last 35 years are reviewed. The major purpose of Hungarian power economy is to save hydrocarbon fuels by taking advantages of power import opportunities by operating nuclear power plants at maximum capacity and the coal fired power stations at high capacity. The basic principles, the algorithm applied to optimize the load distribution of the electrical power system are discussed in detail with special attention to the role of nuclear power. The planned availability of nuclear power plants and the amount of electricity generated by nuclear plants should also be optimized. (V.N.)

  16. Transmission Characteristics of an OFDM signal for Power Line Communication System with High Bit Rate

    Science.gov (United States)

    Mori, Akira; Watanabe, Yosuke; Tokuda, Masamitsu; Kawamoto, Koji

    In this paper, we measured what influence the sinusoidal transmission characteristics of the electric power line with various forms gave to the transmission characteristic of OFDM (Orthogonal Frequency Division Multiplexing) signal through PLC (power line communication system) modem. We classified the electric power line transmission line with various forms in a real environment into two basic elements, which are an outlet type branch and a switch type branch. Next, PHY rate (Physical rate) is measured for each basic element connected with the PLC modem. At this time, the transmission characteristics of the electric power line are simulated from measured data. OFDM sending and receiving systems are composed on the computer, and the PHY rate is simulated. By comparing with measured and calculated values, it is revealed that PHY rate of PLC modem is most affected in the case of the power line transmission characteristics having broad band and high level attenuation and group delay variation, and is not affected in the case of that having narrow band attenuation and group delay variation.

  17. Impacts on human health from the coal and nuclear fuel cycles and other technologies associated with electric power generation and transmission

    International Nuclear Information System (INIS)

    Radford, E.P.

    1980-01-01

    Major public health impacts of electric power generation and transmission associated with the nuclear fuel cycle and with coal use are evaluated. Only existing technology is evaluated. The only health effects of concern are those leading to definable human disease and injury. Health effects are scaled to a nominal 1000 Megawatt (electric) plant fueled by either option. Comparison of the total health effects to the general public gives: nuclear, 0.03 to 0.05 major health effects per 1000 MWe per year; coal, 0.7 to 3.7 per 1000 MWe per year. Thus for the general public the health risks from the coal cycle are about 50 times greater than for the nuclear cycle. Health effects to workers in the industry are currently quite high. For the nuclear cycle, 4.6 to 5.1 major health impacts per 1000 MWe per year; for coal, 6.5 to 10.9. The two-fold greater risk for the coal cycle is primarily due to high injury rates in coal miners. There is no evidence that electrical transmission contributes any health effects to the general public, except for episodes where broken power lines come in contact with people. For power line workers, the risk is estimated at 0.1 serious injury per 1000 MWe per year

  18. ELMO model predicts the price of electric power

    International Nuclear Information System (INIS)

    Antila, H.

    2001-01-01

    Electrowatt-Ekono has developed a new model, by which it is possible to make long-term prognoses on the development of electricity prices in the Nordic Countries. The ELMO model can be used as an analysis service of the electricity markets and estimation of the profitability of long-term power distribution contracts with different scenarios. It can also be applied for calculation of technical and economical fundamentals for new power plants, and for estimation of the effects of different taxation models on the emissions of power generation. The model describes the whole power generation system, the power and heat consumption and transmission. The Finnish power generation system is based on the Electrowatt-Ekono's boiler database by combining different data elements. Calculation is based on the assumption that the Nordic power generation system is used optimally, and that the production costs are minimised. In practise the effectively operated electricity markets ensure the optimal use of the production system. The market area to be described consists of Finland and Sweden. The spot prices have long been the same. Norway has been treated as a separate market area. The most potential power generation system, the power consumption and the power transmission system are presumed for the target year during a normal rainfall situation. The basic scenario is calculated on the basis of the preconditional data. The calculation is carried out on hourly basis, which enables the estimation of the price variation of electric power between different times during the day and seasons. The system optimises the power generation on the basis of electricity and heat consumption curves and fuel prices. The result is an hourly limit price for electric power. Estimates are presented as standard form reports. Prices are presented as average annuals, in the seasonal base, and in hourly or daily basis for different seasons

  19. Transmission and wind investment in a deregulated electricity industry

    DEFF Research Database (Denmark)

    Maurovich-Horvat, Lajos; Boomsma, Trine Krogh; Fleten, Stein-Erik

    2013-01-01

    carrying out investment in wind farms. In this paper, we analyse the interaction between the two conflicting objectives under various assumptions about the electricity market structure and the degree of producers' market power. Via a three-node illustrative example, we show that a merchant investor...... the auspices of a regulated welfare-maximising planner, recent restructuring of electricity industries has introduced a merchant model for transmission investment, which provides congestion rents from construction of a new line. Thus, the merchant investor's incentives are different from those of producers...... typically builds less transmission capacity than a welfare-maximising transmission system operator or central planner. Although social welfare is lower and nodal prices are generally higher with a merchant investor and when producers are assumed to behave à la Cournot, the effect of lower price response...

  20. Evaluation of efficiency in Japan electric power companies

    International Nuclear Information System (INIS)

    Ghaderi, F.; Muyajima, M.

    2001-01-01

    Achieving energy efficiency also must consider supply efficiency, how much energy it takes to generate electricity and transmit it to the end user. system efficiency reflects the loss of energy during the processes of generation, transmission and distribution of electricity. Of the millions of tons of coal that are burned to produce heat in generation of electricity every year, only one third is converted into electricity.The electric power plant immediately uses 5 to 10 percent of that energy for use in the plant. Around another 10 percent of this energy is consumed in the transmission and distribution of electric energy to end users. Overall,more that 70 percent of the energy used to produce and deliver electricity never gets to the end user. The costs of this wasted energy are reflected in the customer's electricity bill. Furthermore, once delivered, users of electricity are subjected to more h idden c osts the demand charge which reflects the rate at which consumers draw energy from the power plant during a particular time of day, are also affected by the time of year. This additional charge c n be dramatic. For example, the cost for using electric air conditioning at the w rong t ime of the day , are also affected by the time of year. This additional charge can be dramatic. For example, the cost for using electric air conditioning at the wrong time of the day could be as much as 25 to 40 percent higher than what a facility normally pays for electricity during off-peak times. Minimizing the costs of operations, therefor, is a must for all electric companies. In the other hand utility rates, such as the cost of electricity, are a necessary element of operating in all enterprises.In some industries the payment over electricity make a large percentage of their total expenses, but that doesn't mean that every effort should not be made to reduce their impact on the bottom line, it should be considered that a very small change in operating procedure can change

  1. Electric Utility Transmission and Distribution Line Engineering Program

    Energy Technology Data Exchange (ETDEWEB)

    Peter McKenny

    2010-08-31

    working professionals wishing to update their skills or increase their knowledge of utility engineering design practices and procedures. By providing graduate educational opportunities for the above groups, the T&D Program will help serve a strong industry need for training the next generation of engineers in the cost-effective design, construction, operation, and maintenance of modern electrical transmission and distribution systems. In addition to developing the on-line engineering courses described above, the T&D Program also focused significant efforts towards enhancing the training opportunities available to power system operators in the northwest. These efforts have included working with outside vendors to provide NERC-approved training courses in Gonzaga University's (GU) system operator training facility, support for an accurate system model which can be used in regional blackstart exercises, and the identification of a retired system operator who could provide actual regional training courses. The GU system operator training facility is also being used to recruit young workers, veterans, and various under-represented groups to the utility industry. Over the past three years students from Columbia Gorge Community College, Spokane Falls Community College, Walla Walla Community College, Central Washington University, Eastern Washington University, Gonzaga University, and various local high schools have attended short (one-day) system operator training courses free of charge. These collaboration efforts has been extremely well received by both students and industry, and meet T&D Program objectives of strengthening the power industry workforce while bridging the knowledge base across power worker categories, and recruiting new workers to replace a predominantly retirement age workforce. In the past three years the T&D Program has provided over 170 utility engineers with access to advanced engineering courses, been involved in training more than 300 power system

  2. Maximization of revenues for power sales from a solid waste resources recovery facility

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-01

    The report discusses the actual implementation of the best alternative in selling electrical power generated by an existing waste-to-energy facility, the Metro-Dade County Resources Recovery Plant. After the plant processes and extracts various products out of the municipal solid waste, it burns it to produce electrical power. The price for buying power to satisfy the internal needs of our Resources Recovery Facility (RRF) is substantially higher than the power price for selling electricity to any other entity. Therefore, without any further analysis, it was decided to first satisfy those internal needs and then export the excess power. Various alternatives were thoroughly explored as to what to do with the excess power. Selling power to the power utilities or utilizing the power in other facilities were the primary options.

  3. Power for the future : towards a sustainable electricity system for Ontario

    International Nuclear Information System (INIS)

    Winfield, M.S.; Horne, M.; McClenaghan, T.; Peters, R.

    2004-05-01

    Ontario's electricity system has undergone major changes since 1998, when the Hydro-Electric Power Commission was divided into four separate entities, Ontario Power Generation, Hydro One, the Ontario Electricity Financial Corporation, and the Electrical Safety Authority. In addition, retail and wholesale electricity markets were introduced in 2002 under the supervision of the Ontario Energy Board. The removal from service of several nuclear generating facilities in the province led to greater reliance on coal-fired generation to meet energy demands. In 2003, the newly elected provincial government made a commitment to phase out coal-fired plants by 2007 for environmental reasons. It is estimated that all the the existing nuclear facilities will reach their projected operational lifetimes by 2018. Given the province's growing electricity demand, several options have been proposed as to how future energy needs could be met. The options range from investment into low-impact renewable energy sources such as small-scale hydro, solar, biomass and wind, to the construction of new nuclear generating facilities. The Pembina Institute and the Canadian Environmental Law Association examined the following four key issues regarding Ontario's future direction in electricity generation, transmission and distribution: (1) by how much can electricity demand be reduced through the adoption of energy efficient technologies, fuel switching, cogeneration and demand response measures, (2) how much electricity supply can be obtained from low-impact renewable energy sources, (3) how should the grid demand be met once the electricity system has maximized the technically and economically feasible contributions from energy efficiency, fuel switching, cogeneration, response management measures (RMM) and renewable energy sources, and (4) what public policies should the province adopt to maximize energy efficiency, fuel switching, cogeneration, RMM and renewable energy sources. The Canadian

  4. Transmission rights and market power

    International Nuclear Information System (INIS)

    Bushnell, J.

    1999-01-01

    Most of the concerns about physical transmission rights relate to the ability to implicitly or explicitly remove that transmission capacity from the market-place. Under a very strict form of physical right, owners could simply choose not to sell it if they don't want to use it. Modifications that require the release of spare capacity back into an open market could potentially alleviate this problem but there is concern that such releases would not occur far enough in advance to be of much use to schedulers. Similarly, the transmission capacity that is made available for use by non-rights holders can also be manipulated by the owners of transmission rights. The alternative form, financial transmission rights, provide to their owners congestion payments, but physical control of transmission paths. In electricity markets such as California's, even financial transmission rights could potentially be utilized to effectively withhold transmission capacity from the marketplace. However, methods for withholding transmission capacity are somewhat more convoluted, and probably more difficult, for owners of financial rights than for owners of physical rights. In this article, the author discusses some of the potential concerns over transmission rights and their use for the exercise of various forms of market power

  5. Virtual scarce water embodied in inter-provincial electricity transmission in China

    International Nuclear Information System (INIS)

    Zhang, Chao; Zhong, Lijin; Liang, Sai; Sanders, Kelly T.; Wang, Jiao; Xu, Ming

    2017-01-01

    Highlights: • Virtual water in inter-provincial electricity transmission in China is calculated. • A Water Stress Index is used to reflect relative scarcity of water consumption. • West Inner Mongolia is the largest exporter of scarce water. • Hebei, Beijing and Shandong are the three largest receivers of scarce water. - Abstract: Intra-national electricity transmission drives virtual water transfer from electricity production regions to electricity consumption regions. In China, the water-intensive thermoelectric power industry is expanding quickly in many water-scarce energy production hubs in northern and northwestern provinces. This study constructed a node-flow model of inter-provincial electricity transmission to investigate the virtual water and scarcity-adjusted virtual water (or virtual scarce water) embodied in the electricity transmission network. It is revealed that total inter-provincial virtual water transfer embodied in electricity transmission was 623 million m"3 in 2011, equivalent to 12.7% of the national total thermoelectric water consumption. The top three largest single virtual water flows are West Inner Mongolia-to-Beijing (44 million m"3), East Inner Mongolia-to-Liaoning (39 million m"3), and Guizhou-to-Guangdong (37 million m"3). If the actual volumes of consumptive water use are translated into scarcity-adjusted water consumption based on Water Stress Index, West Inner Mongolia (81 million m"3), Shanxi (63 million m"3) and Ningxia (30 million m"3) become the top three exporters of virtual scarce water. Many ongoing long-distance electricity transmission projects in China will enlarge the scale of scarce water outflows from northwestern regions and potentially increase their water stress.

  6. SimWIND: A geospatial infrastructure model for optimizing wind power generation and transmission

    International Nuclear Information System (INIS)

    Phillips, Benjamin R.; Middleton, Richard S.

    2012-01-01

    Wind is a clean, enduring energy resource with the capacity to satisfy 20% or more of U.S. electricity demand. Presently, wind potential is limited by a paucity of electrical transmission lines and/or capacity between promising wind resources and primary load centers. We present the model SimWIND to address this shortfall. SimWIND is an integrated optimization model for the geospatial arrangement and cost minimization of wind-power generation–transmission–delivery infrastructure. Given a set of possible wind-farm sites, the model simultaneously determines (1) where and how much power to generate and (2) where to build new transmission infrastructure and with what capacity in order to minimize the cost for delivering a targeted amount of power to load. Costs and routing of transmission lines consider geographic and social constraints as well as electricity losses. We apply our model to the Electric Reliability Council of Texas (ERCOT) Interconnection, considering scenarios that deliver up to 20 GW of new wind power. We show that SimWIND could potentially reduce ERCOT's projected ∼$5B transmission network upgrade line length and associated costs by 50%. These results suggest that SimWIND's coupled generation–transmission–delivery modeling approach could play a critical role in enhancing planning efforts and reducing costs for wind energy integration. - Highlights: ► Wind power is limited by transmission capacity between resources and demands. ► SimWIND is a coupled generation-transmission-delivery model for wind infrastructure. ► The model minimizes costs considering realistic transmission routing and networking. ► We show that SimWIND could save 50% of $5B costs for expanding the Texas grid. ► Results suggest SimWIND may play a critical role in enhancings wind planning efforts.

  7. Market tools: the immaterial part of the electricity transmission network

    International Nuclear Information System (INIS)

    Maillard, Dominique

    2014-01-01

    The author first evokes the activities of RTE (Reseau de transport d'electricite - the French power transmission network) to improve the performance of its technical and industrial equipment (notably equipment evolution, maintenance policies) with, for example, the installation of a fibre optic network for network control automation, the development of software for a better exploitation and steering of electricity fluxes, notably the electricity produced by wind and photovoltaic power. He more particularly addresses the role of RTE in the construction of the electricity market. He outlines the role of the European electricity market in the economic optimization, the new approaches and tools for a higher flexibility of the electric system, the expertise of RTE, and the perspective of always more smart grids

  8. Needs for Constructing and Possibilities of Nuclear Power Plants Interconnection to the Croatian Electricity Grid

    International Nuclear Information System (INIS)

    Zeljko, M.; Bajs, D.

    1998-01-01

    Due to development of electric power system and considering an increase of electrical energy consumption, needs for larger units in new power plants are obvious. Connection of large nuclear power plants to the grid, depending on their power and location, usually requires significant investments in transmission network development and construction. Considering the capacity of the 400 kV transmission network in Croatia, this problem is evident. This paper deals with the possibilities of nuclear power plants construction, as one possible option in electric power system development, and their interconnection to the electricity grid. (author)

  9. Modeling particle emission and power flow in pulsed-power driven, nonuniform transmission lines

    Directory of Open Access Journals (Sweden)

    Nichelle Bruner

    2008-04-01

    Full Text Available Pulsed-power driven x-ray radiographic systems are being developed to operate at higher power in an effort to increase source brightness and penetration power. Essential to the design of these systems is a thorough understanding of electron power flow in the transmission line that couples the pulsed-power driver to the load. In this paper, analytic theory and fully relativistic particle-in-cell simulations are used to model power flow in several experimental transmission-line geometries fielded on Sandia National Laboratories’ upgraded Radiographic Integrated Test Stand [IEEE Trans. Plasma Sci. 28, 1653 (2000ITPSBD0093-381310.1109/27.901250]. Good agreement with measured electrical currents is demonstrated on a shot-by-shot basis for simulations which include detailed models accounting for space-charge-limited electron emission, surface heating, and stimulated particle emission. Resonant cavity modes related to the transmission-line impedance transitions are also shown to be excited by electron power flow. These modes can drive oscillations in the output power of the system, degrading radiographic resolution.

  10. Transmission Reinforcements in the Central American Regional Power System

    Energy Technology Data Exchange (ETDEWEB)

    Elizondo, Marcelo A.; Vallem, Mallikarjuna R.; Samaan, Nader A.; Makarov, Yuri V.; Vyakaranam, Bharat; Nguyen, Tony B.; Munoz, Christian; Herrera, Ricardo; Midence, Diego; Shpitsberg, Anna

    2016-07-25

    The Central American regional interconnected power system (SER) connects the countries members of the Central American regional electricity market (MER): Guatemala, El Salvador, Honduras, Nicaragua, Costa Rica, and Panama. The SER was a result of a long term regional effort, and was initially conceived to transfer 300 MW between countries. However, the current transfer limits between countries range from 70 MW to 300 MW. Regional entities, like CRIE (Regional Commission of Electrical Interconnection), EOR (Central American Regional System Operator), and CDMER (Board of Directors of the Central American Market) are working on coordinating the national transmission expansion plans with regional transmission planning efforts. This paper presents experience in Central America region to recommend transmission reinforcements to achieve 300 MW transfer capacity between any pair of member countries of the Central American regional electricity market (MER). This paper also provides a methodology for technical analysis and for coordination among the regional and national entities. This methodology is unique for transmission systems of these characteristics.

  11. Energy losses of superconducting power transmission cables in the grid

    DEFF Research Database (Denmark)

    Østergaard, Jacob; Okholm, Jan; Lomholt, Karin

    2001-01-01

    One of the obvious motives for development of superconducting power transmission cables is reduction of transmission losses. Loss components in superconducting cables as well as in conventional cables have been examined. These losses are used for calculating the total energy losses of conventional...... as well as superconducting cables when they are placed in the electric power transmission network. It is concluded that high load connections are necessary to obtain energy saving by the use of HTSC cables. For selected high load connections, an energy saving of 40% is expected. It is shown...

  12. 76 FR 23222 - Electric Reliability Organization Interpretation of Transmission Operations Reliability

    Science.gov (United States)

    2011-04-26

    ....3d 1342 (DC Cir. 2009). \\5\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693... Reliability Standards for the Bulk-Power System. Action: FERC-725A. OMB Control No.: 1902-0244. Respondents...] Electric Reliability Organization Interpretation of Transmission Operations Reliability AGENCY: Federal...

  13. Electrical supervisory control and data acquisition system for Power Reactor Fuel Reprocessing Facility (PREFRE-II) at Tarapur

    International Nuclear Information System (INIS)

    Singh, V.K.; Kaushik, S.; Haneef, K.K.M.

    2014-01-01

    Power Reactor Fuel Reprocessing Facility (PREFRE II) is a radio-chemical plant located at Tarapur. The electric power supply to PREFRE-II plant has been provided from a 33 KV Sub-station located in PREFRE-II complex to meet the O and M requirement of plant. The major equipment of the substation includes HT switch board, dry type transformer, LT switch board, Diesel Generator (DG) set and Un-interrupted Power Supply (UPS) System. The power supply to the plant is provided at 415 V voltage level with the help of Power Distribution Boards (PDBs) and Motor Control Centres (MCCs) located at different floors of the plant. The parameters of the electrical equipment of substation and plant are recorded in each shift in the log-book, manually by the operator. To maintain the log-book, the operator needs to go closer to the individual equipment in radioactive area of the plant to read the parameters. The log-book method of monitoring is a cumbersome method and does not include fault event records, trends and diagnostic behavior of the equipment. Electrical Supervisory Control and Data Acquisition (E-SCADA) system has been increasingly used in Nuclear Power Plants (NPPs) for control and monitoring of electrical parameters of plant and switchyard equipment. E-SCADA system has been designed, developed and implemented for PREFRE-II plant for remote monitoring of parameters of electrical equipment. E-SCADA system provides monitoring of electrical equipment and renders complete guidance and information with the help of Graphical User Interface (GUI) to the operator to take necessary action during normal and abnormal conditions. E-SCADA with intelligent communication features helps in reducing cabling from field equipment which enhances the fire safety of plant. As a result engineering, operation and maintenance efforts for monitoring are reduced considerably in terms of requirement of skilled man power and accurate data logging of electrical parameters. This system also helps to

  14. ANALYSIS OF GROSS REGIONAL PRODUCT FLUCTUATIONS AND ELECTRIC POWER CONSUMPTION IN 2005- 2014. RESERVES FOR DECREASING ELECTRIC POWER PRICES

    Directory of Open Access Journals (Sweden)

    Suslov N. I.

    2016-09-01

    Full Text Available In this work we considered the trajectories of change in indicators characterizing the status of economics and power industry: gross regional product, electric power consumption, industrial production, energy prices and costs of delivering electric power to consumers in Russian regions for the last 10 years. Low global commodity prices and sanctions led to a sharp decrease of equipment import, which resulted in an acute problem of import substitution. The level of tariffs of natural monopolies is of great importance for industrial development. The goal of this work was to analyze possibilities for reducing electric power prices by changing the institutional and economic conditions of management. We analyzed not only the official information from Rosstat, but also government regulations, figures given in the official government publication «The Rossiyskaya Gazeta» as well as articles and interviews on economic problems of the electric power industry over the recent years published in «The Kommersant» newspaper. High tariffs of network marketing companies for electric energy transmission, state regulation of heating prices, financing the construction of new capacities by charging the payment in power provision contracts, high price of electric power of nuclear power plants lead to an annual increase in electric power prices for end users. In this work we considered possible solutions to limit the growth of electric power prices.

  15. Case study on the US superconducting power transmission program

    Energy Technology Data Exchange (ETDEWEB)

    Hammel, E.F.

    1996-02-01

    After the 1911 discovery of superconductivity (the abrupt loss of electrical resistance in certain materials at very low temperatures), attempts were made to make practical use of this phenomenon. Initially these attempts failed, but in the early 1960s (after 50 years of research) they succeeded. By then, the projected growth in the production and consumption of electrical energy required much higher capacity power transmission capabilities than were available or likely to become available from incremental improvements in existing transmission technology. Since superconductors were capable in principle of transmitting huge amounts of power, research programs to develop and demonstrate superconducting transmission lines were initiated in the US and abroad. The history of the US program, including the participants, their objectives, funding and progress made, is outlined. Since the R&D program was terminated before the technology was completely demonstrated, the reasons for and consequences of this action are discussed in a final section.

  16. Commercial information system of Slovak Electricity Transmission System, Plc

    International Nuclear Information System (INIS)

    Laznicka, L.

    2004-01-01

    Commercial Information System (CIS), which main role of is to support the commercial activities of the company, is built up by business department of SEPS, Plc in close co-operation with the supplier company Sfera, Plc. The system entries are data from electricity meters obtained by automatized data acquisition and from bugging sheets, contractual hour diagrams, parameters of transmission system like measuring schemes and formulas for calculation of demand and supply, contractual data resulting from agreements, business conditions, URSO decisions and valid legislative. A part of the system is also support of process of data evaluation like calculation of transmitted energy quantity, calculation of actual output diagrams, comparison of actual and contractual diagrams, calculation of system divergence, calculation of demand divergence, etc. The final price for the drawings of services, which are joined with transmission of the electric power will be determined by the accounting process. In this causality there are automatically made out invoices for access, losses, system charges, system services, short-term and long-term transits, divergences and for cross-border transmission auctions. System also generates various specialized synopses and statistics for the evaluation requirements of important aspects and for parameter observations. Successive liberalisation of the electricity power market, changes in legislative and URSO decisions require CIS to be sufficiently configurable and to adapt flexible on the alternating environs. (author)

  17. Electric power annual 1998. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-04-01

    The purpose of this report, Electric Power Annual 1998 Volume 1 (EPAVI), is to provide a comprehensive overview of the electric power industry during the most recent year for which data have been collected, with an emphasis on the major changes that occurred. In response to the changes of 1998, this report has been expanded in scope. It begins with a general review of the year and incorporates new data on nonutility capacity and generation, transmission information, futures prices from the Commodity futures Trading commission, and wholesale spot market prices from the pennsylvania-new Jersey-Maryland Independent System Operator and the California Power Exchange. Electric utility statistics at the Census division and State levels on generation, fuel consumption, stocks, delivered cost of fossil fuels, sales to ultimate customers, average revenue per kilowatthour of electricity sold, and revenues from those retail sales can be found in Appendix A. The EPAVI is intended for a wide audience, including Congress, Federal and State agencies, the electric power industry, and the general public.

  18. Optimal Planning of the Nordic Transmission System with 100% Electric Vehicle Penetration of passenger cars by 2050

    DEFF Research Database (Denmark)

    Graabak, Ingeborg; Wu, Qiuwei; Warland, Leif

    2016-01-01

    This paper presents the optimal planning of the Nordic backbone transmission system with 100% electric vehicle penetration of passenger cars by 2050. Electric vehicles will play an important role in the future energy systems and can reduce the greenhouse gas emission from the transport sector....... However, the electric vehicles will increase the electricity consumption and might induce congestions in the transmission systems. In order to deal with the electricity consumption increase from the electric vehicle integration into the power system and maximize the social welfare, the optimal investments...... of the Nordic transmission system are studied. Case studies were conducted using the market simulation model EMPS and two electric vehicle charging scenarios: a spot price based scenario and a dumb charging scenario. The electric vehicle charging power is assumed to be 3.68 kW with 1 phase 16A. The complete...

  19. An Optimum Solution for Electric Power Theft

    Directory of Open Access Journals (Sweden)

    Aamir Hussain Memon

    2013-07-01

    Full Text Available Electric power theft is a problem that continues to plague power sector across the whole country. Every year, the electricity companies face the line losses at an average 20-30% and according to power ministry estimation WAPDA companies lose more than Rs. 125 billion. Significantly, it is enough to destroy the entire power sector of country. According to sources 20% losses means the masses would have to pay extra 20% in terms of electricity tariffs. In other words, the innocent consumers pay the bills of those who steal electricity. For all that, no any permanent solution for this major issue has ever been proposed. We propose an applicable and optimum solution for this impassable problem. In our research, we propose an Electric power theft solution based on three stages; Transmission stage, Distribution stage, and User stage. Without synchronization among all, the complete solution can not be achieved. The proposed solution is simulated on NI (National Instruments Circuit Design Suite Multisim v.10.0. Our research work is an implicit and a workable approach towards the Electric power theft, as for conditions in Pakistan, which is bearing the brunt of power crises already

  20. An Optimum Solution for Electric-Power Theft

    International Nuclear Information System (INIS)

    Memon, A.H.; Memon, F.

    2013-01-01

    Electric power theft is a problem that continues to plague power sector across the whole country. Every year, the electricity companies face the line losses at an average 20-30% and according to power ministry estimation WAPDA companies lose more than Rs. 125 billion. Significantly, it is enough to destroy the entire power sector of country. According to sources 20% losses means the masses would have to pay extra 20% in terms of electricity tariffs. In other words, the innocent consumers pay the bills of those who steal electricity. For all that, no any permanent solution for this major issue has ever been proposed. We propose an applicable and optimum solution for this impassable problem. In our research, we propose an Electric power theft solution based on three stages; Transmission stage, Distribution stage, and User stage. Without synchronization among all, the complete solution can not be achieved. The proposed solution is simulated on NI (National Instruments) Circuit Design Suite Multisim v.10.0. Our research work is an implicit and a workable approach towards the Electric power theft, as for conditions in Pakistan, which is bearing the brunt of power crises already. (author)

  1. Integrated Cost Allocation of Transmission Usage under Electricity Markets

    Directory of Open Access Journals (Sweden)

    Hermagasantos Zein

    2012-08-01

    Full Text Available Cost allocation of transmission usage on the power networks is an important issue especially in the modern electricity market mechanism. In this context, all costs that have been embedded in the transmission, embedded cost, should be covered by the transmission users. This paper follows general methods, where generators are fullyresponsible to cover the embedded cost. It proposes a method to determine the cost allocation of transmission usage based on decomposition through the superposition techinique to determine power flow contributions from an integrated base case of the results of the power flow calculations of all transactions, bilateral and nonbilateral contracts. Mathematically, the applied formulations are illustrated clearly in this paper. The proposed method has been tested with 5-bus system and the results are much different compared to a few of the published methods. This is shown by the test results on the 5 bus system. The published methods produce total power flow contributions in each line is greater than the actual. And they earn total revenues approximately 11.6% greater than the embedded cost. While on the proposed method, the power flow contribu tions are equal to the actual and the revenues are equal to the embedded cost. It shows also that the proposed method gives results as expected.

  2. Electricity for road transport, flexible power systems and wind power

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Lars Henrik; Ravn, H.; Meibom, P. (and others)

    2011-12-15

    The aim of the project is to analyse the potential synergistic interplay that may arise between the power sector and the transport sector, if parts of the road transport energy needs are based on electricity via the utilisation of plug-in hybrid electric vehicles and pure electric vehicles. The project focuses on the technical elements in the chain that comprises: 1: The electric vehicle status, potentials and expected development. Electric batteries are in focus in this part of the analysis. 2: Analysis of plug-in hybrid electric vehicle interacting with a local grid. 3: Analysis of grid-vehicle connection systems including technical regulation options and analysis of needs for standardisation. 4: Setting up scenarios covering potential developments for utilizing electric drive trains in road transport. Period: Up to year 2030. 5: Analysis of capacity constraints in the electricity grid (transmission and distribution) as consequence of increasing electricity demand, and new flexible consumption patterns from segments in the transport sector, and as consequence of increasing capacity on wind power in the system. 6: Setting up and analysis of combined scenarios covering both the heat and power system and the transport sector. (Author)

  3. Comprehensive evaluation of power grid projects' investment benefits under the reform of transmission and distribution price

    Science.gov (United States)

    Wang, Yongli; Wang, Gang; Zuo, Yi; Fan, Lisha; Ling, Yunpeng

    2017-03-01

    On March 15, 2015, the Central Office issued the "Opinions on Further Deepening the Reform of Electric Power System" (Zhong Fa No. 9). This policy marks the central government officially opened a new round of electricity reform. As a programmatic document under the new situation to comprehensively promote the reform of the power system, No. 9 document will be approved as a separate transmission and distribution of electricity prices, which is the first task of promoting the reform of the power system. Grid tariff reform is not only the transmission and distribution price of a separate approval, more of the grid company input-output relationship and many other aspects of deep-level adjustments. Under the background of the reform of the transmission and distribution price, the main factors affecting the input-output relationship, such as the main business, electricity pricing, and investment approval, financial accounting and so on, have changed significantly. The paper designed the comprehensive evaluation index system of power grid projects' investment benefits under the reform of transmission and distribution price to improve the investment efficiency of power grid projects after the power reform in China.

  4. Historical records of the electric power and cooling water systems for the experimental facilities in the I.P.P. (1964-1983)

    International Nuclear Information System (INIS)

    Kitajima, Miyoshi.

    1984-01-01

    Twenty years have passed, since experimental studies began in the IPP. This is a status report on the electric power and cooling water systems in this Institute. Historical records on consumption of the electric power and cooling water for experimental facilities are summarized, also. Valuable stories obtained through operation, control and periodic inspection of these systems are described, which will be helpful for construction of new systems in future. Finally problems on safety, reliability, and economy are commented. (author)

  5. The enforcement order for the law for arrangement of surrounding areas of power generating facilities

    International Nuclear Information System (INIS)

    1980-01-01

    This rule is established under the provisions of the law for the redevelopment of the surrounding areas of power generating facilities. Persons who install power generating facilities under the law include general electric power enterprises and wholesale electric power enterprises defined under the electric enterprises act and the Power Reactor and Nuclear Fuel Development Corporation. The scale of these facilities defined under the law is 350,000 kilo-watts output for atomic and thermal power generating facilities, 10,000 kilo-watts output for the facilities utilizing geothermal energy, 100,000 kilo-watts output for facilities whose main fuel is coal, and 1,000 kilo-watts output for hydraulic power generating facilities, etc. The facilities closely related to atomic power generation include the reprocessing and examination facilities of fuel materials spent in atomic power reactors, the reactors installed by the Japan Atomic Energy Research Institute for studying on the safety of atomic power reactors, the experimental fast reactors and the uranium enrichment facilities established by the Power Reactor and Nuclear Fuel Development Corporation. The public facilities in this rule are those for communication, sport and recreation, environment hygiene, education and culture, medicine, social welfare, fire fighting, etc. Governors of prefectures who intend to get approval under the law shall file redevelopment plans to the competent minister through the Minister of the International Trade and Industry. (Okada, K.)

  6. Power exchange game in the electricity market

    International Nuclear Information System (INIS)

    Pyykko, S.; Partanen, J.; Viljainen, S.; Lassila, J.; Honkapuro, S.; Tahvanainen, K.

    2006-01-01

    Since it is not economically reasonable to build parallel electricity networks, in Finland, Sweden, Norway and Denmark, electricity distribution is protected by monopoly. However, electricity production and selling have been opened up to competition by connecting the transmission networks of these countries together, and it is possible to produce electricity where it is cheapest. A common electricity power market, called Nord Pool, has been created where electricity can be bought, sold or used as an exchange product. In order to help students understand the operation of electricity markets and the use of different electricity exchange products, the Department of Electrical Engineering at Lappeenranta University developed a scheme in which the theory can be used in practice. In the scheme, students are given the responsibility to manage the electricity markets of power companies in order analyze, plan and make decisions, which are skills required on the open power markets. The paper provided an introduction to the electricity markets in Nordic countries and discussed Nord Pool and its products. Information about education at the Department of Electrical Engineering at Lappeenranta University of Technology was also presented. The paper also provided details of the power exchange scheme on the electricity markets. 6 refs., 17 figs

  7. Proximity effects of high voltage electric power transmission lines on ...

    African Journals Online (AJOL)

    Yomi

    2010-08-18

    Aug 18, 2010 ... transmission lines on ornamental plant growth. Zeki Demir ... The effects of proximity to power-line on specific leaf area and seedling dbh were tested .... during vegetation season is about 72% and common wind blow.

  8. Development of a model for integrated simulation of the European transmission networks and electricity markets

    International Nuclear Information System (INIS)

    Rathke, Christian

    2013-01-01

    The liberalisation of electricity markets and the increase of renewable energy generation actually causes dramatic changes for the whole European power industry. The transmission system operators in particular have to meet the challenge to ensure a stable and reliable system operation in the future. Significant changes in power generation will require a substantial extension to current inadequate original transmission grids to handle increased wide area power flows. This is the only way to avoid overloading the grid and to reduce the herefrom resulting limitations for the Pan-European cross-border trade of electricity. This work describes in detail the development of a Pan-European integrated grid and an electricity market simulation tool. For this purpose an overview about the today's structure of the European electricity industry is given initially. Afterwards the configuration of the transmission grid, the used equipment and different methods for the load flow and short circuit calculation are explained. Furthermore models for the calculation of local loads and the power plant dispatch are presented in the following chapters. Following on from this a detailed model of the European electricity industry is developed and the main functions are described by means of some exemplary simulations. The simulation tool developed in this work enables the user to calculate realistic power plant schedules and the consequent resulting physical effects on the European transmission grid. It combines a time series based simulation of the electricity market with a detailed model of the transmission grid. The highly detailing of the model offers the feasibility to execute a complete AC load flow calculation using the Newton Raphson algorithm.Therefore it is possible to identify the active as well as the reactive power flows in the grid. The results of the power flow calculation are the basis for further investigations (e. g. the short circuit calculation) and to decide on

  9. Study of electrical power facilities and measures for planned outages in Japanese hemodialysis clinics after the Great East Japan Earthquake.

    Science.gov (United States)

    Ishida, Kai; Sawa, Manami; Fujiwara, Kousaku; Hirose, Minoru; Tsuruta, Harukazu; Takeuchi, Akihiro; Ikeda, Noriaki

    2013-02-01

    The Great East Japan Earthquake on 11 March 2011 caused major damage in northeastern Japan. The Kanto region experienced a massive electrical power shortage in the summer of 2011. A questionnaire was submitted to 354 hemodialysis clinics in Kanagawa prefecture and the Tokyo metropolitan area, excluding isolated islands, and 176 responses were analyzed (49.7%). The questions included evaluation of the availability of a private electricity generator, countermeasures in case of a planned outage, awareness of saving electricity, and improvement of safety of medical devices or electrical facilities after the earthquake. Only 12% of the clinics had private electricity generators and many clinics had no plans to introduce this facility. However, 96% of the clinics had established countermeasures to deal with a planned outage. Many clinics planned to provide dialysis on a different day or at a different time. All clinics had tried hard to establish procedures to save electricity in the summer of 2011, and 84% of the clinics had reconsidered and improved the safety of medical devices or electricity facilities after the earthquake. These results show that the awareness of crisis management was greatly improved in the wake of the earthquake. © 2012 The Authors. Therapeutic Apheresis and Dialysis © 2012 International Society for Apheresis.

  10. A cooperative game theory approach to transmission planning in power systems

    Science.gov (United States)

    Contreras, Javier

    The rapid restructuring of the electric power industry from a vertically integrated entity into a decentralized industry has given rise to complex problems. In particular, the transmission component of the electric power system requires new methodologies to fully capture this emerging competitive industry. Game theory models are used to model strategic interactions in a competitive environment. This thesis presents a new decentralized framework to study the transmission network expansion problem using cooperative game theory. First, the players and the rules of the game are defined. Second, a coalition formation scheme is developed. Finally, the optimized cost of expansion is allocated based on the history of the coalition formation.

  11. Analysis of Power Network for Line Reactance Variation to Improve Total Transmission Capacity

    Directory of Open Access Journals (Sweden)

    Ikram Ullah

    2016-11-01

    Full Text Available The increasing growth in power demand and the penetration of renewable distributed generations in competitive electricity market demands large and flexible capacity from the transmission grid to reduce transmission bottlenecks. The bottlenecks cause transmission congestion, reliability problems, restrict competition, and limit the maximum dispatch of low cost generations in the network. The electricity system requires efficient utilization of the current transmission capability to improve the Available Transfer Capability (ATC. To improve the ATC, power flow among the lines can be managed by using Flexible AC Transmission System (FACTS devices as power flow controllers, which alter the parameters of power lines. It is important to place FACTS devices on suitable lines to vary the reactance for improving Total Transmission Capacity (TTC of the network and provide flexibility in the power flow. In this paper a transmission network is analyzed based on line parameters variation to improve TTC of the interconnected system. Lines are selected for placing FACTS devices based on real power flow Performance Index (PI sensitivity factors. TTC is computed using the Repeated Power Flow (RPF method using the constraints of lines thermal limits, bus voltage limits and generator limits. The reactance of suitable lines, selected on the basis of PI sensitivity factors are changed to divert the power flow to other lines with enough transfer capacity available. The improvement of TTC using line reactance variation is demonstrated with three IEEE test systems with multi-area networks. The results show the variation of the selected lines’ reactance in improving TTC for all the test networks with defined contingency cases.

  12. Visibility and Visual Characteristics of the Ivanpah Solar Electric Generating System Power Tower Facility

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Robert [Argonne National Lab. (ANL), Argonne, IL (United States); Abplanalp, Jennifer M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2015-03-01

    This report presents the results of a study conducted to document the visibility and visual characteristics of the Ivanpah Solar Electric Generating System (ISEGS), a utility-scale solar power tower facility located on land administered by the U.S. Department of the Interior Bureau of Land Management in southern California. Study activities consisted of field observations of the ISEGS facility and comparison of the observations made in the field with the visual contrast assessments and visual simulations in the ISEGS Final Environmental Impact Statement (Final EIS) and supporting documents created prior to ISEGS construction. Field observations of ISEGS were made from 19 locations within 35 mi (56 km) of the facility in the course of one week in September 2014. The study results established that reflected sunlight from the receivers was the primary source of visual contrast from the operating ISEGS facility. The ISEGS facility was found to be a major source of visual contrast for all observations up to 20 mi (32 km), and was easily visible at 35 mi. Glare from individual heliostats was frequently visible, and often brighter than the reflected light from the receivers. Heliostat glare caused discomfort for one or more viewers at distances up to 20 mi. The ISEGS power blocks were brightly lit at night, and were conspicuous at the observation distance of approximately 6 mi (10 km). The facility is substantially brighter and is seen more clearly in the field than in photographs of the facility or in the prepared simulations, which were based on photographs. The simulations of the ISEGS facility in the Final EIS, which were evaluated as part of this study, sometimes lacked spatial accuracy and realism. The evaluated simulations generally under-represented the actual visual contrast from the project, and some of the contrast ratings in the Final EIS predicted substantially lower levels of visual contrast than were actually observed for the operating facility.

  13. Efficiency of Finish power transmission network companies

    International Nuclear Information System (INIS)

    Anon.

    2001-01-01

    The Finnish Energy Market Authority has investigated the efficiency of power transmissions network companies. The results show that the intensification potential of the branch is 402 million FIM, corresponding to about 15% of the total costs of the branch and 7.3 % of the turnout. Energy Market Authority supervises the reasonableness of the power transmission prices, and it will use the results of the research in supervision. The research was carried out by the Quantitative Methods Research Group of Helsinki School of Economics. The main objective of the research was to create an efficiency estimation method for electric power distribution network business used for Finnish conditions. Data of the year 1998 was used as basic material in the research. Twenty-one of the 102 power distribution network operators was estimated to be totally efficient. Highest possible efficiency rate was 100, and the average of the efficiency rates of all the operators was 76.9, the minimum being 42.6

  14. The future of fission-electric power

    International Nuclear Information System (INIS)

    Morowski, J.V.

    1983-06-01

    Future worldwide electricity supply needs dictate the necessity of maintaining a sound capability for electricity and electric power generating facilities, including nuclear, as viable export commodities. A survey of fission-power plant types and the status of worldwide nuclear electric power illustrates the primary emphasis on LWR's and HWR's as two leading types in the export market. This survey examines the factors affecting the market prospects for the next five to fifteen years and provides a discussion on some possible improvements to current market circumstances. A comparative description is provided for some of the types of LWR and CANDU characteristics such as quantities, schedules, constructability factors, and equipment and system. Important factors in the selection process for future nuclear power plants are discussed. Some factors included are seismic design requirements; plant design description and possible site layout; plant protection, control and instrumentation; thermal cycle design and arrangement; and special construction and rigging requirements

  15. An Optimal Domestic Electric Vehicle Charging Strategy for Reducing Network Transmission Loss While Taking Seasonal Factors into Consideration

    Directory of Open Access Journals (Sweden)

    Yuancheng Zhao

    2018-01-01

    Full Text Available With the rapid growth of domestic electric vehicle charging loads, the peak-valley gap and power fluctuation rate of power systems increase sharply, which can lead to the increase of network losses and energy efficiency reduction. This paper tries to regulate network loads and reduce power system transmission loss by optimizing domestic electric vehicle charging loads. In this paper, a domestic electric vehicle charging loads model is first developed by analyzing the key factors that can affect users’ charging behavior. Subsequently, the Monte Carlo method is proposed to simulate the power consumption of a cluster of domestic electric vehicles. After that, an optimal electric vehicle charging strategy based on the 0-1 integer programming is presented to regulate network daily loads. Finally, by taking the IEEE33 distributed power system as an example, this paper tries to verify the efficacy of the proposed optimal charging strategy and the necessity for considering seasonal factors when scheduling electric vehicle charging loads. Simulation results show that the proposed 0-1 integer programming method does have good performance in reducing the network peak-valley gap, voltage fluctuation rate, and transmission loss. Moreover, it has some potential to further reduce power system transmission loss when seasonal factors are considered.

  16. Integrated powertrain control for hybrid electric vehicles with electric variable transmission

    NARCIS (Netherlands)

    Kessels, J.T.B.A.; Foster, D.L.; Bosch, van den P.P.J.

    2009-01-01

    The electric variable transmission (EVT) offers a powersplit for hybrid electric vehicles by integrating two motor/ generator sets into one electric machine. This double rotor concept implements a continuously variable transmission between the engine and the driveline, including the possibility for

  17. Scenarios for Deep Carbon Emission Reductions from Electricity by 2050 in Western North America using the Switch Electric Power Sector Planning Model: California's Carbon Challenge Phase II, Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, James; Mileva, Ana; Johnston, Josiah; Kammen, Daniel; Wei, Max; Greenblatt, Jeffrey

    2014-01-01

    This study used a state-of-the-art planning model called SWITCH for the electric power system to investigate the evolution of the power systems of California and western North America from present-day to 2050 in the context of deep decarbonization of the economy. Researchers concluded that drastic power system carbon emission reductions were feasible by 2050 under a wide range of possible futures. The average cost of power in 2050 would range between $149 to $232 per megawatt hour across scenarios, a 21 to 88 percent increase relative to a business-as-usual scenario, and a 38 to 115 percent increase relative to the present-day cost of power. The power system would need to undergo sweeping change to rapidly decarbonize. Between present-day and 2030 the evolution of the Western Electricity Coordinating Council power system was dominated by implementing aggressive energy efficiency measures, installing renewable energy and gas-fired generation facilities and retiring coal-fired generation. Deploying wind, solar and geothermal power in the 2040 timeframe reduced power system emissions by displacing gas-fired generation. This trend continued for wind and solar in the 2050 timeframe but was accompanied by large amounts of new storage and long-distance high-voltage transmission capacity. Electricity storage was used primarily to move solar energy from the daytime into the night to charge electric vehicles and meet demand from electrified heating. Transmission capacity over the California border increased by 40 - 220 percent by 2050, implying that transmission siting, permitting, and regional cooperation will become increasingly important. California remained a net electricity importer in all scenarios investigated. Wind and solar power were key elements in power system decarbonization in 2050 if no new nuclear capacity was built. The amount of installed gas capacity remained relatively constant between present-day and 2050, although carbon capture and sequestration was

  18. Overview on the electric power in june 2003

    International Nuclear Information System (INIS)

    2003-01-01

    This document aims to give information on the exploitation of the transmission public network and the french electric power industry during june 2003: the internal electric power consumption in France (national consumption is the total of all the electrical energy supplied for consumption in France (including Corsica, but not the French Overseas Departments), thermal and hydro generation + imports - exports - pumping, and which have been consumed in the transmission and distribution networks, by the end-users, as well as by losses) - national consumption in June 2003 has risen by 1.8% compared with that of June 2002. The June average temperature which has been 2.9 deg. C higher in 2003 than in June 2002 has resulted in consumption linked to higher use of air-conditioning. Adjusted for climatic effects, monthly consumption has increased by 1.3% compared with June 2002. The consumption growth rate adjusted over 12 months has fallen by 0.1% since last month, whereas the national consumption growth rate over the last 12 months has remained stable; the energy accounting from the transmission point of view (the balance recorded by RTE takes into account only the energy physical flows conveyed on the RTE network) - in June 2003, consumption has increased compared with June 2002, whereas exports have fallen by 0.3 TWh. The overall volume of injections has risen by 0.2 TWh. This month, hydro generation is down by 0.8 TWh due to inflows being 25% lower than in June 2002, whereas thermal generation is up by 0.3 TWh. Imports are up by around 0.7 TWh; the consumption and the physical exchanges (these values reflect all of the flows on the RTE network, as well as the generation auto-consumed by the industrial consumers connected to this network); the electric power market: the market players, contractual exchanges recorded by RTE contracts for access to international connections, contractual exchanges by border; and the evolution of the transmission network - the following

  19. Non-contact magnetic coupled power and data transferring system for an electric vehicle

    International Nuclear Information System (INIS)

    Matsuda, Y.; Sakamoto, H.

    2007-01-01

    We have developed a system which transmits electric power and communication data simultaneously in a non-contact method using a magnetic coupling coil. Already, we are developing the fundamental technology of a non-contact charging system, and this is applied in electric shavers, electric toothbrushes, etc. Moreover, basic experiments are being conducted for applying this non-contact charging system to electric equipments such as an electric vehicle (EV), which is a zero emission vehicle and environmentally excellent and will be the transportation means of the next generation. The technology can also be applied in other electronic equipment, etc. However, since the power supply route for these individual devices is independent, the supply system is complicated. EV also has to perform the transmission of electric power and the transmission of information (data), such as the amount of the charge, in a separate system, and thus is quite complicated. In this study, by performing simultaneously the transmission of electric power and information (data) using magnetic coupling technology in which it does not contact, the basic experiment aimed at attaining and making unification of a system simple was conducted, and the following good results were obtained: (1) Electric power required for load can be transmitted easily by non-contact. (2) A signal can easily be transmitted bidirectionally by non-contact. (3) This system is reliable, and is widely applicable

  20. Potential for deserts to supply reliable renewable electric power

    Science.gov (United States)

    Labordena, Mercè; Lilliestam, Johan

    2015-04-01

    To avoid dangerous climate change, the electricity systems must be decarbonized by mid-century. The world has sufficient renewable electricity resources for complete power sector decarbonization, but an expansion of renewables poses several challenges for the electricity systems. First, wind and solar PV power are intermittent and supply-controlled, making it difficult to securely integrate this fluctuating generation into the power systems. Consequently, power sources that are both renewable and dispatchable, such as biomass, hydro and concentrating solar power (CSP), are particularly important. Second, renewable power has a low power density and needs vast areas of land, which is problematic both due to cost reasons and due to land-use conflicts, in particular with agriculture. Renewable and dispatchable technologies that can be built in sparsely inhabited regions or on land with low competition with agriculture would therefore be especially valuable; this land-use competition greatly limits the potential for hydro and biomass electricity. Deserts, however, are precisely such low-competition land, and are at the same time the most suited places for CSP generation, but this option would necessitate long transmission lines from remote places in the deserts to the demand centers such as big cities. We therefore study the potential for fleets of CSP plants in the large deserts of the world to produce reliable and reasonable-cost renewable electricity for regions with high and/or rapidly increasing electricity demand and with a desert within or close to its borders. The regions in focus here are the European Union, North Africa and the Middle East, China and Australia. We conduct the analysis in three steps. First, we identify the best solar generation areas in the selected deserts using geographic information systems (GIS), and applying restrictions to minimize impact on biodiversity, soils, human heath, and land-use and land-cover change. Second, we identify

  1. Optimal pricing of transmission and distribution services in electricity supply

    International Nuclear Information System (INIS)

    Farmer, E.D.; Cory, B.J.; Perera, B.L.P.P.

    1995-01-01

    A new strategy for the separate pricing of transmission and distribution services in electricity supply is formulated and evaluated. The proposed methodology is a multivariate transmission generalisation of the method of peak load pricing previously applied to the optimal time-of-use pricing of generation on a power system with diverse generation technologies and with elastic demand. The method allocates both capacity and operational costs on a time-of-use basis, in an optimal manner, that avoids cross-subsidisation both between differing supply system participants and differing times of usage. The method is shown to promote the optimal development of the transmission, distribution or interconnecting systems, rewarding justified investments in transmission capacity and discouraging overinvestment. It also leads to appropriate returns on invested capital without significant 'revenue reconciliation'. This contrasts with SRMC pricing as is shown by a comparative revenue evaluation. It is concluded that the method has wide potential application in electricity supply. (author)

  2. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  3. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  4. Transmission access raises unresolved economic issues

    International Nuclear Information System (INIS)

    Happ, H.H.

    1994-01-01

    The electric utility industry is in the process of gradual change from a fully regulated industry to one of partial deregulation. Instead of relying on regulation to achieve a fair and equitable price to the consumer for electric energy, the reliance is placed more and more on market forces, through competition, to provide wholesale energy at the best market price. Clearly, open transmission access is required to create a viable competitive wholesale market for new generation resources. This article describes four unresolved, or at least partially unresolved, issues associated with transmission access for wholesale wheeling. Wheeling has been defined as the use of a utility's transmission facilities to transmit power for other buyers and sellers. At least three parties are involved in a wheeling transaction: a seller, a buyer, and one or more wheeling utilities that transmit the power from the seller to the buyer. This article considers wholesale or bulk wheeling only, and does not consider retail wheeling. The four unresolved economic issues described in this article pertain to transmission access: Actual cost of providing transmission services, Methodology or methodologies used in evaluating the cost of wheeling, Contract path versus the actual power flows of the wheel, Issues associated with the formation of transmission regions

  5. Major trends in the development of electrical power systems

    Energy Technology Data Exchange (ETDEWEB)

    Syromyatnikov, I A

    1965-01-01

    The comparison is made between the USA and the USSR electrical systems and their growth. The author states that USSR is about 35 years behind in the construction of power transmission lines of 22 kV and above. Various graphs of economic developments are presented. It is stated that the work in the near future should be concentrated on 750 kV network and on combining the USSR electric power distribution into a single power system.

  6. Integrating wind power in EU electricity systems. Economic and technical issues

    International Nuclear Information System (INIS)

    Van Werven, M.J.N.; Beurskens, L.W.M.; Pierik, J.T.G.

    2005-02-01

    In view of the ongoing process of liberalisation of the electricity market and the expected increase of wind power pursuant the RES-E Directive (Renewable Energy Sources - Electricity) and the need to minimise the costs of the RES-E targets, this study discusses the technical and economic impacts of integrating wind power into the electricity system. Furthermore, two options for reducing costs of intermittency are researched: forecasting of wind power output and electricity storage. An increasing penetration of wind power into the electricity system causes additional costs, partly due to the fact that the energy source of wind power is uncontrollable, variable (on the short term as well as on the longer term), and unpredictable (especially on the longer term). Consequently, balancing generation and demand becomes more complicated, creating a need for additional secondary and tertiary control. Although the sources of increasing costs are becoming more clearly understood, as are means to mitigate them, the quantification of costs of operating an electricity system with high wind penetration is very hard. Two possible options to reduce costs of intermittency are discussed in this report: forecasting of wind power output and electricity storage. The need for and benefit of wind energy forecasting have been increasingly recognised in recent years. Forecasting of wind power directs on increasing the predictability of the resource and improved forecasting can help to enhance the balancing of supply and demand. DG (distributed generation) operators can provide better information about their expected power output, energy suppliers can submit better estimates of electricity production to the TSO (Transmission System Operator), and system operators can improve network management through better information about expected power flows. Electricity storage systems can, at the same time, offer different services to a number of actors. Next to benefits that result from price

  7. Issues affecting the electricity transmission system in Mexico under a competitive integrated model

    Energy Technology Data Exchange (ETDEWEB)

    Avila Rosales, M.A.; Gonzalez Flores, J. [Federal Electricity Commission, Mexico City (Mexico)

    2008-07-01

    The electricity sector in Mexico is undergoing a process of significant structural change. The traditional industry framework has been exposed to new market structures and greater competition, both of which are being introduced by changing regulations regarding who can generate, transmit, distribute and sell electricity. Mexico's power industry is changing to a competitive integrated model. Electricity industry restructuring is partly based on the assumption that transmission systems should be flexible, reliable, and open to all exchanges no matter where the suppliers and consumers of energy are located and who they are. However, neither the existing transmission systems nor its management infrastructure can fully support this open exchange. This paper described the primary issues affecting the transmission system in Mexico under a competitive environment and a transmission expansion planning approach that took the uncertainties associated with the location and size of new generating power stations into consideration in order to produce least-cost and robust transmission plans. The paper described the planning process, including a rigorous analysis of the economics of the resulting transmission plans. Specifically, the paper described the current regulatory framework and supply adequacy as well as current procedures and methodologies for transmission management and expansion planning. The transmission planning methodology was also presented. This included a minimum cost analysis; profit analysis; and least-cost transmission plan. It was concluded that the transmission expansion planning approach stressed that a horizon year viewpoint was important because transmission additions have long-term use. The transmission expansion planning approach, further defined the process of selecting transmission projects as one of comparing and optimizing attributes such as near-term needs; long-term utilization; contribution to overall reliability; and favorable or least

  8. Comprehensive evaluation of power grid enterprises' credit rating under the reform of transmission and distribution price

    Science.gov (United States)

    Wang, Yongli; Wang, Gang; Zuo, Yi; Fan, Lisha; Wei, Jiaxiang

    2017-03-01

    On March 15, 2015, the central office issued the "Opinions on Further Deepening the Reform of Electric Power System" (in the 2015 No. 9). This policy marks the central government officially opened a new round of electricity reform. As a programmatic document under the new situation to comprehensively promote the reform of the power system, No. 9 document will be approved as a separate transmission and distribution of electricity prices, which is the first task of promoting the reform of the power system. Grid tariff reform is not only the transmission and distribution price of a separate approval, more of the grid company input-output relationship and many other aspects of deep-level adjustments. Under the background of the reform of the transmission and distribution price, the main factors affecting the input-output relationship, such as the main business, electricity pricing, and investment approval, financial accounting and so on, have changed significantly. The paper designed the comprehensive evaluation index system of power grid enterprises' credit rating under the reform of transmission and distribution price to reduce the impact of the reform on the company's international rating results and the ability to raise funds.

  9. Electric Power Consumption Coefficients for U.S. Industries: Regional Estimation and Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Boero, Riccardo [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-07-21

    Economic activity relies on electric power provided by electrical generation, transmission, and distribution systems. This paper presents a method developed at Los Alamos National Laboratory to estimate electric power consumption by different industries in the United States. Results are validated through comparisons with existing literature and benchmarking data sources. We also discuss the limitations and applications of the presented method, such as estimating indirect electric power consumption and assessing the economic impact of power outages based on input-output economic models.

  10. Electric power supply and demand for the contiguous United States, 1980-1989

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-06-01

    A limited review is presented of the outlook for the electric power supply and demand during the period 1980 to 1989. Only the adequacy and reliability aspects of bulk electric power supply in the contiguous US are considered. The economic, financial and environmental aspects of electric power system planning and the distribution of electricity (below the transmission level) are topics of prime importance, but they are outside the scope of this report.

  11. New record in import of electric power in 2000

    International Nuclear Information System (INIS)

    Anon.

    2001-01-01

    In spite of the mild weather in the year 2000 the electric power consumption in Finland increased by nearly 2%. The electric power consumption would be twice as high if the temperatures would have been the same as usually. Hydroelectric power generation in Norway, Sweden and Finland in 2000 was about 40 TWh higher than in 1999. The retained import of electric power in the year 2000 reached a new record, being 11.9 TWh, corresponding to 15% of the annual power consumption in Finland. The GNP in Finland increased in 2000 by 5.7%, and the estimate for 2001 is 4.5%. Total power consumption in Finland in 2000 was 79.1 TWh, which is 1.7% higher than in 1999. About 60% of the increase were covered by import of electric power and 40 % by increasing own power generation. The share of CHP production was 31% of the total power consumption, the share of nuclear power being 27%, the share of hydroelectric power 18% and that of coal and other common condensing power about 8%. The share of retained electric power import was 15%. The Finnish hydroelectric power plants generated 14.4 TWh electric power, which is nearly 15% more than in 1999. Due to the increased production of hydroelectric power and power import the production of coal and other condensing power decreased nearly 9%. The wind power generation increased rapidly being, however, only about 0.1% of the electric power consumption. Industrial power consumption was about 55% of the total, the share of households and agriculture being nearly 24%, and those of services and public sector over 17%. Power transmission and delivery losses were less than 4%. The electric power consumption of households decreased by nearly 2% due to the worm end of the year. The share of other consumers increased by nearly 3%. About 13 000 households acquired electric heating, so the number of electrically heated houses in Finland is 593 000 households. The industrial electric power consumption increased in 2000 by 2.7% up to 43.2 TWh. The share of

  12. Proceedings of the CERI 2006 electricity conference : the challenges of powering Canada's growth

    International Nuclear Information System (INIS)

    2006-01-01

    Decision makers in the electric power industry face continuing challenges regarding changes in electricity market mechanisms, pricing options, and power generation and transmission alternatives. This conference provided an opportunity to review energy markets in North American with particular reference to supply and demand. Opportunities for traditional or new generation technologies based on renewable energy sources including wind powered generation were discussed. The presentations focused on transmission issues, market design and capacity issues as well as market power and pricing. The integration of wind energy into the power grid as a measure to diversify the power generation portfolio in North America was also discussed along with hydrothermal synergies and interconnections. The sessions of the conference were entitled: future generation and market operations in Canada; risks, challenges and opportunities for transmission in Canada; wind power and system integration issues; the role of consumers and demand side management in Canada; cogeneration in Alberta and Canada; and, regulatory issues in Canadian electricity markets. The conference featured 25 presentations, of which 10 have been catalogued separately for inclusion in this database. tabs., figs

  13. Distributed Supply Coordination for Power-to-Gas Facilities Embedded in Energy Grids

    NARCIS (Netherlands)

    Alkano, Desti; Scherpen, Jacquelien M. A.

    This paper considers hydrogen and renewable electricity from power-to-gas (PtG) facilities supplied to a gas grid, a mobility sector, and a power grid. The PtG facilities are equipped with hydrogen buffers and fuel cells. The goal is to maximize the expected profit of PtG facilities without

  14. Electrical energy and cost for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Pence, G.A.

    1983-02-01

    An operational scenario for the Mirror Fusion Test Facility has been developed based on System Requirements, experience with existing systems, and discussions with project engineers and designers who are responsible for the systems. This scenario was used to project the electrical energy required for the facility. Each system is listed showing the equipment that has been considered, the amount of power requested, and in most cases, the power that it is now connected

  15. A literature survey on asset management in electrical power [transmission and distribution] system

    NARCIS (Netherlands)

    Khuntia, S.R.; Rueda Torres, José L.; Bouwman, S.; van der Meijden, M.A.M.M.

    2016-01-01

    Asset management is one of the key components in a transforming electric power industry. Electric power industry is undergoing significant changes because of technical, socio-economical and environmental developments. Also, because of restructuring and deregulation, the focus has been on

  16. Integration of electric drive vehicles in the Danish electricity network with high wind power penetration

    DEFF Research Database (Denmark)

    Chandrashekhara, Divya K; Østergaard, Jacob; Larsen, Esben

    2010-01-01

    /conventional) which are likely to fuel these cars. The study was carried out considering the Danish electricity network state around 2025, when the EDV penetration levels would be significant enough to have an impact on the power system. Some of the interesting findings of this study are - EDV have the potential......This paper presents the results of a study carried out to examine the feasibility of integrating electric drive vehicles (EDV) in the Danish electricity network which is characterised by high wind power penetration. One of the main aims of this study was to examine the effect of electric drive...... vehicles on the Danish electricity network, wind power penetration and electricity market. In particular the study examined the effect of electric drive vehicles on the generation capacity constraints, load curve, cross border transmission capacity and the type of generating sources (renewable...

  17. National development plan for transmission arrangement in the electric power system 1995-2005; Nasjonal utbyggingsplan for overfoeringsanlegg i elkraftsystemet 1995-2005

    Energy Technology Data Exchange (ETDEWEB)

    Moi, K.A.; Trengereid, F.

    1996-09-01

    The report concerns the national development plan for the electric power transmission system in Norway. The aim of the plan is to give a simple and collected survey of estimated demand of investment connected to the regional and central grids in the period from 1995 to 2005 based on these development plans, and to give a survey over the different power and energy prognoses being used. There is emphasized that the work of planning is a continuous process where changed premises can make an influence on both the schedule and the extent of necessary measures. The investment is calculated to be about NOK 15 billion in the period mentioned which comprise both new system designs and modernization of existing transmission systems. Dimensioned power capacity and the energy consumption are assumed to increase on an average of about 1.8 per cent towards the year of 2010. 10 figs., 2 tabs.

  18. Unbundling generation and transmission services for competitive electricity markets

    International Nuclear Information System (INIS)

    Hirst, E.; Kirby, B.

    1998-01-01

    Ancillary services are those functions performed by the equipment and people that generate, control, and transmit electricity in support of the basic services of generating capacity, energy supply, and power delivery. The Federal Energy Regulatory Commission (FERC) defined such services as those 'necessary to support the transmission of electric power from seller to purchaser given the obligations of control areas and transmitting utilities within those control areas to maintain reliable operations of the interconnected transmission system.' The nationwide cost of ancillary services is about $12 billion a year, roughly 10% of the cost of the energy commodity. More important than the cost, however, is the necessity of these services for bulk-power reliability and for the support of commercial transactions. FERC's landmark Order 888 included a pro forma tariff with provision for six key ancillary services. The Interconnected Operations Services Working Group identified another six services that it felt were essential to the operation of bulk-power systems. Several groups throughput the United States have created or are forming independent system operators, which will be responsible for reliability and commerce. To date, the electricity industry (including traditional vertically integrated utilities, distribution utilities, power markets and brokers, customers, and state and federal regulators) has paid insufficient attention to these services. Although the industry had made substantial progress in identifying and defining the key services, much remains to be doe to specify methods to measure the production, delivery, and consumption of these services; to identify the costs and cost-allocation factors for these services; and to develop market and operating rules for their provision and pricing. Developing metrics, determining costs, and setting pricing rules are important because most of these ancillary services are produced by the same pieces of equipment that

  19. Network cost in transmission and distribution of electric power

    International Nuclear Information System (INIS)

    Lindahl, A.; Naeslund, B.; Oettinger-Biberg, C.; Olander, H.; Wuolikainen, T.; Fritz, P.

    1994-01-01

    This report is divided in two parts, where part 1 treats the charges on the regional nets with special emphasis on the net owners tariffs on a deregulated market. Part 2 describes the development of the network costs in electric power distribution for the period 1991-1993. 11 figs, 33 tabs

  20. A data seamless interaction scheme between electric power secondary business systems

    Science.gov (United States)

    Ai, Wenkai; Qian, Feng

    2018-03-01

    At present, the data interaction of electric power secondary business systems is very high, and it is not universal to develop programs when data interaction is carried out by different manufacturers' electric power secondary business systems. There are different interaction schemes for electric power secondary business systems with different manufacturers, which lead to high development cost, low reusability and high maintenance difficulty. This paper introduces a new data seamless interaction scheme between electric power secondary business systems. The scheme adopts the international common Java message service protocol as the transmission protocol, adopts the common JavaScript object symbol format as the data interactive format, unified electric power secondary business systems data interactive way, improve reusability, reduce complexity, monitor the operation of the electric power secondary business systems construction has laid a solid foundation.

  1. Power facility plan and power supply plan of Japan in 1988

    Energy Technology Data Exchange (ETDEWEB)

    Yoshino, Shoji; Makino, Masao

    1988-06-01

    The power facility plan and the power supply plan for 1988 are described. The demand by non-industrial use will grow at an average of 3.8% for the 1986-97 period due to changes in the life style, construction and extension of buildings and increasing use of OA equipment although the power conservation is promoted. The industrial consumption will increase at only 1.2% a year due to the slowed growth and energy saving. As a result, the total demand will be 778,200 million kWh in 1997 with annual growth of 2.4%. The maximum demand will be 151,210 kW in 1997 with annual growth of 2.9%. The annual load rate will decrease to 56.9%, showing a continuously worsening utilization efficiency of power facilities. The development of 29 power units with total capacity of 2,760 MW is planned in 1988 for a stable power supply with a sufficient margin regarding maximum demand. The plan requires the investment of 3,700 billion yen, including the power transmission systems and substations. The power supply plan in 1988 is aimed at the effective operation of facilities and cost reduction by regional management under proper recognition of local characteristics of each power source, while maintaining a stable power supply with specified margins. (1 fig, 11 tabs)

  2. HVDC power transmission technology assessment

    Energy Technology Data Exchange (ETDEWEB)

    Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

    1997-04-01

    The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

  3. Macedonian transmission grid capability and development

    International Nuclear Information System (INIS)

    Naumoski, K.; Achkoska, E.; Paunoski, A.

    2015-01-01

    The main task of the transmission grid is to guarantee evacuation of electricity from production facilities and, at the same time, supply the electricity to all customers, in a secure, reliable and qualitative manner. During the last years, transmission grid goes through the period of fast and important development, as a result of implementation of renewable and new technologies and creation of internal European electricity market. Due to these reasons, capacity of the existing grid needs to be upgraded either with optimization of existing infrastructure or constructing the new transmission projects. Among the various solutions for strengthening the grid, the one with the minimal investment expenses for construction is selected. While planning the national transmission grid, MEPSO planners apply multi-scenarios analyses, in order to handle all uncertainties, particularly in the forecasts on loads, production and exchange of electricity, location and size of the new power plants, hydrological conditions, integration of renewable sources and the evolution of the electricity market. Visions for development of European transmission grid are also considered. Special attention in the development plan is paid to modelling of power systems in the region of South-Eastern Europe and covering a wider area of the regional transmission grid with simulations of various market transactions. Macedonian transmission grid is developed to satisfy all requirements for electricity production/supply and transits, irrespective which scenario will be realized on long-term basis. Transmission development plan gives the road map for grid evolution from short-term and mid-term period towards long-term horizons (15-20 years ahead). While creating long-term visions, a big challenge in front of transmission planners is implementation of NPP. The paper gives overview of the planning process of Macedonian transmission grid,comprising: definition of scenarios,planning methodology and assessment of

  4. METHODICAL APPROACHES TO THE CHOICE OF THE NEW GENERATION OF HIGH-VOLTAGE POWER TRANSMISSION LINE 220 kV OPTIONS

    Directory of Open Access Journals (Sweden)

    POSTOLATI V.M.

    2010-08-01

    Full Text Available The Transmission Power Lines of new generation are described in the article (single- compact, double-circuit compact, double-circuit Controlled Self-compensating High Voltage Transmission Power Lines (CSHVL. Basic principles of creation, design elements and comparative characteristics of the transmission lines of the new generation are described, the advantages of its are showed. Methodical approaches to the choosing of a new generation of transmission lines and facilities management FACTS are formulated. Methodical approaches to the choice of options for transmission lines 220 kV and facilities management are shown.

  5. A framework for cost-based pricing of transmission and ancillary services in competitive electric power markets

    International Nuclear Information System (INIS)

    Zobian, A.; Ilic, M.D.

    1995-01-01

    In this paper the authors propose a framework for accurate cost determination and pricing of transmission and ancillary services in competitive electric power markets. The proposed framework is based on their anticipation of the evolving environment and industry structure. They envision the future as a competitive energy market with a centralized control entity that coordinates system activities, prices transmission and ancillary services and controls various system resources. This control entity has control over a certain (pre-defined) geographical area. It is proposed that the system operation and control be kept as they are currently done in control centers, no major change in these functions is required for the proposed pricing strategy. The pricing strategy is divided into two main classes based on time scale separation and firmness, short and long term, firm and interruptible contracts. The approach is based on superposition of different transaction on the network, and a three-part tariff design. The charges are directly related to the impact of each transaction on the system

  6. Space power transmission

    Energy Technology Data Exchange (ETDEWEB)

    Kuribayashi, Shizuma [Mitsubishi Heavy Industries, Ltd., Tokyo, (Japan)

    1989-10-05

    There being a conception to utilize solar energy by use of a space power station (SPS), a method to bring that universal grace to mankind is wireless energy transmission. The wireless energy transmission is regarded to be microwave transmission or laser beam transmission. The microwave transmission is to transmit 2.45GHz band microwave from the SPS to a receiving station on the ground to meet power demand on earth. The microwave, as small in attenuation in atmosphere and resistant against rain and cloud, is made candidate and, however, problematic in influence on organism, necessary large area of receiving antenna and many other points to be studied. While the laser transmission, as more convergent of beam than the microwave transmission, is advantageous with enabling the receiving area to be small and, however, disadvantageous with being not resistant against dust, rain and cloud, if used for the energy transmission between the space and earth. 2 refs., 2 figs.

  7. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 3, Appendix A

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  8. Overview of FACTS devices for wind power plants directly connected to the transmission network

    DEFF Research Database (Denmark)

    Adamczyk, Andrzej Grzegorz; Teodorescu, Remus; Rodriguez, Pedro

    2010-01-01

    Growing number of wind turbines is changing electricity generation profile all over the world. This brings challenges for power system operation, which was designed and developed around conventional power plants with directly coupled synchronous generators. In result, safety and stability...... of the electrical network with high wind energy penetration might be compromised. For this reason transmission system operators (TSO) impose more stringent connection requirements on the wind power plant (WPP) owners. On the other hand flexible AC transmission systems (FACTS) devices offer enhancement of grid...... research in FACTS applicability for WPPs is summarized. Examples of few existing FACTS applications for wind farms are given....

  9. A High-power Electric Propulsion Test Platform in Space

    Science.gov (United States)

    Petro, Andrew J.; Reed, Brian; Chavers, D. Greg; Sarmiento, Charles; Cenci, Susanna; Lemmons, Neil

    2005-01-01

    This paper will describe the results of the preliminary phase of a NASA design study for a facility to test high-power electric propulsion systems in space. The results of this design study are intended to provide a firm foundation for subsequent detailed design and development activities leading to the deployment of a valuable space facility. The NASA Exploration Systems Mission Directorate is sponsoring this design project. A team from the NASA Johnson Space Center, Glenn Research Center, the Marshall Space Flight Center and the International Space Station Program Office is conducting the project. The test facility is intended for a broad range of users including government, industry and universities. International participation is encouraged. The objectives for human and robotic exploration of space can be accomplished affordably, safely and effectively with high-power electric propulsion systems. But, as thruster power levels rise to the hundreds of kilowatts and up to megawatts, their testing will pose stringent and expensive demands on existing Earth-based vacuum facilities. These considerations and the human access to near-Earth space provided by the International Space Station (ISS) have led to a renewed interest in space testing. The ISS could provide an excellent platform for a space-based test facility with the continuous vacuum conditions of the natural space environment and no chamber walls to modify the open boundary conditions of the propulsion system exhaust. The test platform could take advantage of the continuous vacuum conditions of the natural space environment. Space testing would provide open boundary conditions without walls, micro-gravity and a realistic thermal environment. Testing on the ISS would allow for direct observation of the test unit, exhaust plume and space-plasma interactions. When necessary, intervention by on-board personnel and post-test inspection would be possible. The ISS can provide electrical power, a location for

  10. Electrons without borders: legal issues in exporting power

    International Nuclear Information System (INIS)

    Atcheson, Aaron

    2011-01-01

    Miller Thomson LLP provides a range of personal and business law legal services to a variety of projects, particularly those involving renewable energy generation. This paper discusses the legal issues the company has faced in exporting power. There are three ways to export electricity, sale of environmental attributes/carbon credits across borders, via existing transmission facilities and via new transmission facilities. Authorizations by the relevant provincial entity are required to export via the existing transmission. To export power across into the US, permission is needed from both the National Energy Board (NEB) and from the US authorities. The history and the process of obtaining this permission through the NEB are discussed in detail. The approvals and considerations necessary to transport power through new transmission facilities and sale of environmental attributes are given in detail. The paper concludes that a special project is needed with unique opportunities to make the export of power the destination for all production.

  11. Nuclear power's effects on electric rate making

    International Nuclear Information System (INIS)

    Smith, D.S.; Lancaster, A.A.

    1978-01-01

    Government and the electric utility industry are re-evaluating nuclear power's contribution to the total U.S. energy supplies. This article addresses how the recently increased nuclear plant construction and operation costs are translated into the prices that consumers pay for electricity. The electric rates that consumers pay must reflect the costs of producing electricity, as well as the costs of transmission, distribution, metering, and billing. The use of nuclear power for electric production is anticipated to grow rapidly so as to meet a larger portion of our country's electricity needs through the end of the century; so nuclear power costs are expected to be an even larger portion of the total electricity price. There are certain rate-making issues that are actively being discussed in public forums and before state and Federal regulatory bodies. These issues are not unique to nuclear power, but take on added significance when nuclear power is used by utilities to produce electricity because of the technology required and because of the type, timing, and magnitude of the costs involved. These are: (1) inclusion of construction work in progress in the rate base; (2) fuel adjustment clauses and treatment of nuclear fuel cycle costs; (3) treatment of certain taxes under the rate-making method called normalization or deferral accounting (sometimes referred to as ''phantom taxes''); and (4) rate treatment for particular nuclear expense items reflecting costs of delays, plant cancellations, and operational slowdowns

  12. 49 CFR 195.575 - Which facilities must I electrically isolate and what inspections, tests, and safeguards are...

    Science.gov (United States)

    2010-10-01

    ... electrical transmission tower footings, ground cables, or counterpoise, or in other areas where it is... Corrosion Control § 195.575 Which facilities must I electrically isolate and what inspections, tests, and... other structures as a single unit. (b) You must install one or more insulating devices where electrical...

  13. Insulation co-ordination in high-voltage electric power systems

    CERN Document Server

    Diesendorf, W

    2015-01-01

    Insulation Co-ordination in High-Voltage Electric Power Systems deals with the methods of insulation needed in different circumstances. The book covers topics such as overvoltages and lightning surges; disruptive discharge and withstand voltages; self-restoring and non-self-restoring insulation; lightning overvoltages on transmission lines; and the attenuation and distortion of lightning surges. Also covered in the book are topics such as the switching surge designs of transmission lines, as well as the insulation coordination of high-voltage stations. The text is recommended for electrical en

  14. Strategic avionics technology definition studies. Subtask 3-1A3: Electrical Actuation (ELA) Systems Test Facility

    Science.gov (United States)

    Rogers, J. P.; Cureton, K. L.; Olsen, J. R.

    1994-01-01

    Future aerospace vehicles will require use of the Electrical Actuator systems for flight control elements. This report presents a proposed ELA Test Facility for dynamic evaluation of high power linear Electrical Actuators with primary emphasis on Thrust Vector Control actuators. Details of the mechanical design, power and control systems, and data acquisition capability of the test facility are presented. A test procedure for evaluating the performance of the ELA Test Facility is also included.

  15. Overview on the electric power in july 2003

    International Nuclear Information System (INIS)

    2003-01-01

    This document aims to give information on the exploitation of the transmission public network and the french electric power industry during july 2003: the internal electric power consumption in France (national consumption is the total of all the electrical energy supplied for consumption in France (including Corsica, but not the French Overseas Departments), thermal and hydro generation + imports - exports - pumping, and which have been consumed in the transmission and distribution networks, by the end-users, as well as by losses) - national consumption in July 2003 has risen by 2.5% compared with July 2002. The July average temperature, which has been 2.3 deg. C higher in 2003 than in July 2002, has resulted in consumption linked to higher use of air-conditioning and agricultural sprinklers. Adjusted for climatic effects, monthly consumption has increased by 1.5% compared with July 2002. The consumption growth rate adjusted over 12 months has fallen by 0.2% since last month, whereas the national consumption growth rate over the last 12 months has fallen by 0.1%; the energy accounting from the transmission point of view (the balance recorded by RTE takes into account only the energy physical flows conveyed on the RTE network) - in July 2003, consumption has remained stable compared with July 2002, with increased deliveries to distribution networks (+0.7 TWh) compensating for the drop in deliveries to industrial consumers (-0.1 TWh) and exports (-0.5 TWh). Injections have risen slightly (+0.2 TWh) due to the combined effects of a substantial increase in thermal generation (+0.9 TWh) and imports (+0.1 TWh), which offset the considerable fall in hydro generation (-0.8 TWh); the consumption and the physical exchanges (these values reflect all of the flows on the RTE network, as well as the generation auto-consumed by the industrial consumers connected to this network); the electric power market: the market players, contractual exchanges recorded by RTE contracts for

  16. Variable Ratio Hydrostatic Transmission Simulator for Optimal Wind Power Drivetrains

    Directory of Open Access Journals (Sweden)

    Jose M. Garcia-Bravo

    2017-01-01

    Full Text Available This work presents a hydromechanical transmission coupled to an electric AC motor and DC generator to simulate a wind power turbine drive train. The goal of this project was to demonstrate and simulate the ability of a hydrostatic variable ratio system to produce constant electric power at varying wind speeds. The experimental results show that the system can maintain a constant voltage when a 40% variation in input speed is produced. An accompanying computer simulation of the system was built and experimentally validated showing a discrete error no larger than 12%. Both the simulation and the experimental results show that the electrical power output can be regulated further if an energy storage device is used to absorb voltage spikes produced by abrupt changes in wind speed or wind direction.

  17. Salt Lake City Area Integrated Projects electric power marketing -- Final environmental impact statement. Volume 1: Summary

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Service Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alternative

  18. Terminological dictionary of electrical power industry in range of generation, transmission and distribution of electric energy

    International Nuclear Information System (INIS)

    Biernacki, T.; Cegla, S.; Ciszewski, W.

    1990-08-01

    The dictionary contains about 5000 terms about conventional and nuclear power plants, energy sources, transmission lines, automation, power systems, environment protection, statistics etc. Each term is given with definition and its equivalents in English, French, German and Russian. Indexes of Polish, English, French, German and Russian terms are provided at the back of dictionary. (A.S.)

  19. Geothermal electric power generation in Iceland for the proposed Iceland/United Kingdom HVDC power link

    International Nuclear Information System (INIS)

    Hammons, T.J.; Palmason, G.; Thorhallsson, S.

    1991-01-01

    The paper reviews geothermal electric power potential in Iceland which could economically be developed to supplement hydro power for the proposed HVDC Power Link to the United Kingdom, and power intensive industries in Iceland, which are envisaged for development at this time. Technically harnessable energy for electricity generation taking account of geothermal resources down to an assumed base depth, temperature distribution in the crust, probable geothermal recovery factor, and accessibility of the field, has been assessed. Nineteen known high-temperature fields and 9 probable fields have been identified. Technically harnessable geo-heat for various areas is indicated. Data on high temperature fields suitable for geothermal electric power generation, and on harnessable energy for electric power generation within volcanic zones, is stated, and overall assessments are made. The paper then reviews how the potential might be developed, discussing preference of possible sites, and cost of the developments at todays prices. Cost of geothermal electric power generation with comparative costs for hydro generation are given. Possible transmission system developments to feed the power to the proposed HVDC Link converter stations are also discussed

  20. Experimental Investigation of the Corona Discharge in Electrical Transmission due to AC/DC Electric Fields

    Directory of Open Access Journals (Sweden)

    Fuangpian Phanupong

    2016-01-01

    Full Text Available Nowadays, using of High Voltage Direct Current (HVDC transmission to maximize the transmission efficiency, bulk power transmission, connection of renewable power source from wind farm to the grid is of prime concern for the utility. However, due to the high electric field stress from Direct Current (DC line, the corona discharge can easily be occurred at the conductor surface leading to transmission loss. Therefore, the polarity effect of DC lines on corona inception and breakdown voltage should be investigated. In this work, the effect of DC polarity and Alternating Current (AC field stress on corona inception voltage and corona discharge is investigated on various test objects, such as High Voltage (HV needle, needle at ground plane, internal defect, surface discharge, underground cable without cable termination, cable termination with simulated defect and bare overhead conductor. The corona discharge is measured by partial discharge measurement device with high-frequency current transformer. Finally, the relationship between supply voltage and discharge intensity on each DC polarity and AC field stress can be successfully determined.

  1. An optimization framework for the integrated planning of generation and transmission expansion in interconnected power systems

    International Nuclear Information System (INIS)

    Guerra, Omar J.; Tejada, Diego A.; Reklaitis, Gintaras V.

    2016-01-01

    Highlights: • A novel optimization framework for the design and planning of interconnected power systems is proposed. • The framework integrates generation and transmission capacity expansion planning. • Reserve and emission constraints are included. • Business as usual and CO_2 mitigation policy scenarios are evaluated. • Reconfiguration of existing power generation technologies is the most cost-effective option for CO_2 emissions mitigation. - Abstract: Energy, and particularly electricity, has played and will continue to play a very important role in the development of human society. Electricity, which is the most flexible and manageable energy form, is currently used in a variety of activities and applications. For instance, electricity is used for heating, cooling, lighting, and for operating electronic appliances and electric vehicles. Nowadays, given the rapid development and commercialization of technologies and devices that rely on electricity, electricity demand is increasing faster than overall primary energy supply. Consequently, the design and planning of power systems is becoming a progressively more important issue in order to provide affordable, reliable and sustainable energy in timely fashion, not only in developed countries but particularly in developing economies where electricity demand is increasing even faster. Power systems are networks of electrical devices, such as power plants, transformers, and transmission lines, used to produce, transmit, and supply electricity. The design and planning of such systems require the selection of generation technologies, along with the capacity, location, and timing of generation and transmission capacity expansions to meet electricity demand over a long-term horizon. This manuscript presents a comprehensive optimization framework for the design and planning of interconnected power systems, including the integration of generation and transmission capacity expansion planning. The proposed

  2. Electricity market equilibrium model with resource constraint and transmission congestion

    Energy Technology Data Exchange (ETDEWEB)

    Gao, F. [ABB, Inc., Santa Clara, CA 95050 (United States); Sheble, G.B. [Portland State University, Portland, OR 97207 (United States)

    2010-01-15

    Electricity market equilibrium model not only helps Independent System Operator/Regulator analyze market performance and market power, but also provides Market Participants the ability to build optimal bidding strategies based on Microeconomics analysis. Supply Function Equilibrium (SFE) is attractive compared to traditional models and many efforts have been made on it before. However, most past research focused on a single-period, single-market model and did not address the fact that GENCOs hold a portfolio of assets in both electricity and fuel markets. This paper first identifies a proper SFE model, which can be applied to a multiple-period situation. Then the paper develops the equilibrium condition using discrete time optimal control considering fuel resource constraints. Finally, the paper discusses the issues of multiple equilibria caused by transmission network and shows that a transmission constrained equilibrium may exist, however the shadow price may not be zero. Additionally, an advantage from the proposed model for merchant transmission planning is discussed. (author)

  3. Electricity market equilibrium model with resource constraint and transmission congestion

    International Nuclear Information System (INIS)

    Gao, F.; Sheble, G.B.

    2010-01-01

    Electricity market equilibrium model not only helps Independent System Operator/Regulator analyze market performance and market power, but also provides Market Participants the ability to build optimal bidding strategies based on Microeconomics analysis. Supply Function Equilibrium (SFE) is attractive compared to traditional models and many efforts have been made on it before. However, most past research focused on a single-period, single-market model and did not address the fact that GENCOs hold a portfolio of assets in both electricity and fuel markets. This paper first identifies a proper SFE model, which can be applied to a multiple-period situation. Then the paper develops the equilibrium condition using discrete time optimal control considering fuel resource constraints. Finally, the paper discusses the issues of multiple equilibria caused by transmission network and shows that a transmission constrained equilibrium may exist, however the shadow price may not be zero. Additionally, an advantage from the proposed model for merchant transmission planning is discussed. (author)

  4. 75 FR 43519 - Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No...

    Science.gov (United States)

    2010-07-26

    ... DEPARTMENT OF ENERGY Western Area Power Administration Parker-Davis Project; Transmission Capacity for Renewable Energy Between Electrical District No. 5 Substation and the Palo Verde Hub AGENCY... Department of Energy (DOE), is requesting SOIs from entities that are interested in purchasing transmission...

  5. Station-keeping of a high-altitude balloon with electric propulsion and wireless power transmission: A concept study

    Science.gov (United States)

    van Wynsberghe, Erinn; Turak, Ayse

    2016-11-01

    A stable, ultra long-duration high-altitude balloon (HAB) platform which can maintain stationary position would represent a new paradigm for telecommunications and high-altitude observation and transmission services, with greatly reduced cost and complexity compared to existing technologies including satellites, telecom towers, and unmanned aerial vehicles (UAVs). This contribution proposes a lightweight superpressure balloon platform for deployment to an altitude of 25 km. Electrohydrodynamic (EHD) thrusters are presented to maintain position by overcoming stratospheric winds. Critical to maintaining position is a continual supply of electrical power to operate the on-board propulsion system. One viable solution is to deliver power wirelessly to a high-altitude craft from a ground-based transmitter. Microwave energy, not heavily attenuated by the atmosphere, can be provided remotely from a ground-based generator (magnetron, klystron, etc.) and steered electrically with an antenna array (phased array) at a designated frequency (such as 2.45 or 5.8 GHz). A rectifying antenna ("rectenna") on the bottom of the balloon converts waves into direct current for on-board use. Preliminary mission architecture, energy requirements, and safety concerns for a proposed system are presented along with recommended future work.

  6. Transmission capacity and market power: the effect on a dominant generation firm

    International Nuclear Information System (INIS)

    Quick, David M.; Carey, Janis M.

    2002-01-01

    We examine the effect of transmission on a firm's market power by analyzing the optimal dispatch for a dominant firm in a short-run regional electricity generation market. Application of our research to Colorado shows that the dominant firm can strategically congest transmission into the region to receive a maximum price 54.9% of the time. When it does not get the maximum price, the dominant firm can receive an 11.6% average markup over the competitive price. We show how the threat of entry across an enhanced transmission grid can increase competition and limit market power in Colorado. (Author)

  7. Cross-Country Electricity Trade, Renewable Energy and European Transmission Infrastructure Policy

    OpenAIRE

    Abrell, Jan; Rausch, Sebastian

    2016-01-01

    This paper develops a multi-country multi-sector general equilibrium model, integrating high-frequency electricity dispatch and trade decisions, to study the e ects of electricity transmission infrastructure (TI) expansion and re- newable energy (RE) penetration in Europe for gains from trade and carbon dioxide emissions in the power sector. TI can bene t or degrade environ- mental outcomes, depending on RE penetration: it complements emissions abatement by mitigating dispatch problems associ...

  8. Development of a coordinated control system for BWR nuclear power plant and HVDC transmission system

    International Nuclear Information System (INIS)

    Ishikawa, M.; Hara, T.; Hirayama, K.; Sekiya, K.

    1986-01-01

    The combined use of dc and ac transmissions or so-called hybrid transmission was under study, employing both dc and ac systems to enable stable transmission of 10,000 MW of electric power generated by the BWR nuclear plant, scheduled to be built about 800 km away from the center of the load. It was thus necessary to develop a hybrid power transmission control system, the hybrid power transmission system consisting of a high voltage dc transmission system (HVDC) and an ultrahigh ac transmission system (UHVAC). It was also necessary to develop a control system for HVDC transmission which protects the BWR nuclear power plant from being influenced by any change in transmission mode that occurs as a result of faults on the UHVAC side when the entire power of the BWR plant is being sent by the HVDC transmission. This paper clarifies the requirements for the HVDC system control during hybrid transmission and also during dc transmission. The control method that satisfies these requirements was studied to develop a control algorithm

  9. Power transmission pricing: issues and international experience

    International Nuclear Information System (INIS)

    Bodenhoefer, H.J.; Wohlgemuth, N.

    2001-01-01

    A key aspect of electricity industry reorganization is transmission pricing because it heavily influences the degree of effective competition in 'liberalized' electricity markets. this paper presents an overview transmission pricing models, of issues related to an effective design of a transmission pricing approach, and presents approaches implemented internationally. A conclusion is that, due to the great number of institutional designs of electricity market organizations, particularly in Europe, it will be difficult to design/implement a model of cross-border transmission pricing that is capable of inducing a high degree of non-discriminatory international competition in electricity markets. (author)

  10. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 4, Appendixes B-D

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  11. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  12. Architecture Analysis of Wireless Power Transmission for Lunar Outposts

    Science.gov (United States)

    2015-09-01

    continuous supply of electrical power would be required. The primary research was to determine if it is feasible to provide power to a lunar polar...space exploration business wish to go beyond the Moon, to Mars and to the asteroids , the technology for these ventures is not yet adequate for the task...klystron, both 16 developed during World War II, that the use of microwaves became available for effective transmission of energy. However, the

  13. Summary of the electric power supply program for fiscal 1981

    International Nuclear Information System (INIS)

    Shimada, Minoru

    1981-01-01

    The plans of electric power supply for fiscal 1981 (from April, 1981, to March, 1982) by the power companies were formulated and submitted to the Ministry of International Trade and Industry. Along with the current up trend of economic activities, the demands of electric power will be on the increase. A summer peak of power consumption may rise all the more due to the increase in room-cooling units. On the other hand, the problem of petroleum is unsettled. Under the situation, the principal considerations behind the formulation of the plans are the effective utilization of other energy resources than oil and the suppression of oil-burning power generation, the economical usage of all power generation facilities and stabilized demand and supply, and the promotion of wide-area operation. The situation in fiscal 1981, power demands, power source facilities demand and supply balance, and the interchange of power among power companies are described. (J.P.N.)

  14. A GIS-based Power Transmission Management Information System

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    <正>Based on analyzing the shortcomings of electric power enterprise in traditional operation pattern,this paper combines components GIS with the application of management information system,and uses the structure which unifies three layers C/S and B/S.Also,proposed using the GPS intellectualization patrol.This may be useful to guarantees the transmission line’s operation to be safe and stable.

  15. Reactor power control method upon accidents of electrical power system

    International Nuclear Information System (INIS)

    Hirose, Masao.

    1983-01-01

    Purpose: To enable to continue the operation of a BWR type reactor by avoiding the scram while suppressing the reactor power, just after the external disturbance such as earth-trouble in power-transmission network. Method: Steep power drop of an electrical generator is to be detected not only by a current-type power-load-unbalance relay but also with a power-type power-load-unbalance-relay. If steep power-drop was detected by the latter relay, a previously selected control rod is rapidly inserted into the reactor. In this way, in the case where there is a possibility of the reactor scram, the scram can be avoided by suppressing the reactor power, thus the reactor operation can be continued. (Kamimura, M.)

  16. Generation adequacy and transmission interconnection in regional electricity markets

    International Nuclear Information System (INIS)

    Cepeda, Mauricio; Saguan, Marcelo; Finon, Dominique; Pignon, Virginie

    2009-01-01

    The power system capacity adequacy has public good features that cannot be entirely solved by electricity markets. Regulatory intervention is then necessary and established methods have been used to assess adequacy and help regulators to fix this market failure. In regional electricity markets, transmission interconnections play an important role in contributing to adequacy. However, the adequacy problem and related policy are typically considered at a national level. This paper presents a simple model to study how the interconnection capacity interacts with generation adequacy. First results indicate that increasing interconnection capacity between systems improves adequacy up to a certain level; further increases do not procure additional adequacy improvements. Furthermore, besides adequacy improvement, increasing transmission capacity under asymmetric adequacy criteria or national system characteristics could create several concerns about externalities. These results imply that regional coordination of national adequacy policies is essential to internalise adequacy of cross-border effects.

  17. International Benchmarking of Electricity Transmission System Operators

    DEFF Research Database (Denmark)

    Agrell, Per J.; Bogetoft, Peter

    2014-01-01

    Electricity transmission system operators (TSO) in Europe are increasing subject to high-powered performance-based regulation, such as revenue-cap regimes. The determination of the parameters in such regimes is challenging for national regulatory authorities (NRA), since there is normally a single...... TSO operating in each jurisdiction. The solution for European regulators has been found in international regulatory benchmarking, organized in collaboration with the Council of European Energy Regulators (CEER) in 2008 and 2012 for 22 and 23 TSOs, respectively. The frontier study provides static cost...... weight restrictions and a correction method for opening balances....

  18. Intelligent Electric Power Systems with Active-Adaptive Electric Networks: Challenges for Simulation Tools

    Directory of Open Access Journals (Sweden)

    Ufa Ruslan A.

    2015-01-01

    Full Text Available The motivation of the presented research is based on the needs for development of new methods and tools for adequate simulation of intelligent electric power systems with active-adaptive electric networks (IES including Flexible Alternating Current Transmission System (FACTS devices. The key requirements for the simulation were formed. The presented analysis of simulation results of IES confirms the need to use a hybrid modelling approach.

  19. Consequences of reduced production of electricity in nuclear power plants

    International Nuclear Information System (INIS)

    The Swedish Power Administration has assessed the possibilities of expanding electric power sources other than nuclear power plants for the years 1980 and 1985. Reports on costs in the form of loss of capital and increased operating costs involved in the dismantling of nuclear power plants are made in Supplement 1. The economics division of the Finance Department, starting with a long-range study model of the Swedish economy, has calculated the consequences of a cutback in electric power up to 1980 for Sweden's economy and employment in that year. The consequences of reduction of electricity supplies up to 1985 are summarized in Supplement 2 in this report. It is concluded that in order to be able to manage the problem of supplying electricity by 1985, it will be necessary to increase oil power above what was assumed in the energy policy program. There will have to be new oil-based power as well. According to the Power Administration, oil-power facilities can be expanded to varying degrees, depending upon when the decision is made. The Power Administration's calculations show that 125 TWh is possible in 1985 without nuclear power only if a decision for discontinuation is made in the fall of 1976. This is based on very optimistic assumptions about the time of execution of a program for oil-steam operation, and also on the assumption that extreme measures will be initiated to force expansion of both district-heating distribution and power + heat facilities. Oil consumption for production of electricity in such an electric power system would be about 9 million m 3 , which is about 5 times more than at present and about one-third of the present total consumption of petroleum products in Sweden

  20. Combination of AC Transmission Expansion Planning and Reactive Power Planning in the restructured power system

    International Nuclear Information System (INIS)

    Hooshmand, Rahmat-Allah; Hemmati, Reza; Parastegari, Moein

    2012-01-01

    Highlights: ► To overcome the disadvantages of DC model in Transmission Expansion Planning, AC model should be used. ► The Transmission Expansion Planning associated with Reactive Power Planning results in fewer new transmission lines. ► Electricity market concepts should be considered in Transmission Expansion Planning problem. ► Reliability aspects should be considered in Transmission Expansion Planning problem. ► Particle Swarm Optimization is a suitable optimization method to solve Transmission Expansion Planning problem. - Abstract: Transmission Expansion Planning (TEP) is an important issue in power system studies. It involves decisions on location and number of new transmission lines. Before deregulation of the power system, the goal of TEP problem was investment cost minimization. But in the restructured power system, nodal prices, congestion management, congestion surplus and so on, have been considered too. In this paper, an AC model of TEP problem (AC-TEP) associated with Reactive Power Planning (RPP) is presented. The goals of the proposed planning problem are to minimize investment cost and maximize social benefit at the same time. In the proposed planning problem, in order to improve the reliability of the system the Expected Energy Not Supplied (EENS) index of the system is limited by a constraint. For this purpose, Monte Carlo simulation method is used to determine the EENS. Particle Swarm Optimization (PSO) method is used to solve the proposed planning problem which is a nonlinear mixed integer optimization problem. Simulation results on Garver and RTS systems verify the effectiveness of the proposed planning problem for reduction of the total investment cost, EENS index and also increasing social welfare of the system.

  1. Electricity Statistics for France. Definitive results for the year 2015

    International Nuclear Information System (INIS)

    2016-01-01

    The mission of RTE, the French power transmission system operator, a public service assignment, is to balance the electricity supply and demand in real time. This report presents some detailed statistics on electricity flows in France, on electricity market mechanism and on facilities: consumption, generation, trade, RTE's network performance and evolution with respect to the previous year

  2. Electricity Statistics for France. Definitive results for the year 2013

    International Nuclear Information System (INIS)

    2014-01-01

    The mission of RTE, the French power transmission system operator, a public service assignment, is to balance the electricity supply and demand in real time. This report presents some detailed statistics on electricity flows in France, on electricity market mechanism and on facilities: consumption, generation, trade, RTE's network performance and evolution with respect to the previous year

  3. Electrical Collection and Transmission Systems for Offshore Wind Power: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Green, J.; Bowen, A.; Fingersh, L.J.; Wan, Y.

    2007-03-01

    The electrical systems needed for offshore wind farms to collect power from wind turbines--and transmit it to shore--will be a significant cost element of these systems. This paper describes the development of a simplified model of the cost and performance of such systems.

  4. High voltage transmission lines - what are the hazards

    International Nuclear Information System (INIS)

    Repacholi, M.H.

    1985-01-01

    With the increasing use of high voltage alternating current (HVAC) transmission lines there is a growing concern among the public about possible human health effects resulting from exposure to the electric fields associated with these lines. While there is no definitive evidence of such effects, mounting public fear and activism over hypothesized health risks is already causing delays in the licensing and constuction of major power transmission facilities, and is encouraging the formation of regulatory policy. This paper briefly reviews the concerns, biological effects data and standards for HVAC transmission lines

  5. MATL : Canada's first merchant power transmission interconnection : experiences and future outlook

    International Nuclear Information System (INIS)

    Wilson, L.

    2006-01-01

    The current status of the Montana Alberta Tie Ltd. (MATL) merchant transmission project was outlined with reference to the business concept, the advantages of the project and market opportunities. Some of the challenges facing the project were discussed along with lessons learned and accomplishments thus far. MATL is preparing to construct a privately funded transmission line between Lethbridge, Alberta and Great Falls, Montana. The project represents the first direct power transmission inter-connection between Montana and Alberta. The 346 km, 230 kV AC transmission line with phase shifting transformer and 300 MW transfer capacity will be a synchronous interconnection and will improve the reliability of the entire electric systems in both Montana and Alberta. The benefits of the interconnected power system include increased reliability and stability of the existing power grids; better import/export capabilities; more competition and options in the marketplace; greater flexibility in scheduling generator maintenance; and, optimal allocation of generation resources. tabs., figs

  6. Salt Lake City Utah Integrated Projects electric power marketing. Final environmental impact statement, Volume 5: Appendix E

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Service Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alternative

  7. Market power and storage in electricity markets

    International Nuclear Information System (INIS)

    Skaar, Jostein

    2004-05-01

    Market power in liberalised electricity markets dominated by hydropower is analyzed in four chapters. The existing literature on competition in hydropower markets is briefly presented and examined. Chapter 1 discusses the effects of market power in the context of acquisitions in a situation where transmission capacity is constrained. Chapter 2 and 3 elaborate on the issue of competition and market power when water inflow is uncertain, and finally Chapter 4 focuses on the supply function equilibrium model in the context of a hydropower market

  8. Testing of the Engineering Model Electrical Power Control Unit for the Fluids and Combustion Facility

    Science.gov (United States)

    Kimnach, Greg L.; Lebron, Ramon C.; Fox, David A.

    1999-01-01

    The John H. Glenn Research Center at Lewis Field (GRC) in Cleveland, OH and the Sundstrand Corporation in Rockford, IL have designed and developed an Engineering Model (EM) Electrical Power Control Unit (EPCU) for the Fluids Combustion Facility, (FCF) experiments to be flown on the International Space Station (ISS). The EPCU will be used as the power interface to the ISS power distribution system for the FCF's space experiments'test and telemetry hardware. Furthermore. it is proposed to be the common power interface for all experiments. The EPCU is a three kilowatt 12OVdc-to-28Vdc converter utilizing three independent Power Converter Units (PCUs), each rated at 1kWe (36Adc @ 28Vdc) which are paralleled and synchronized. Each converter may be fed from one of two ISS power channels. The 28Vdc loads are connected to the EPCU output via 48 solid-state and current-limiting switches, rated at 4Adc each. These switches may be paralleled to supply any given load up to the 108Adc normal operational limit of the paralleled converters. The EPCU was designed in this manner to maximize allocated-power utilization. to shed loads autonomously, to provide fault tolerance. and to provide a flexible power converter and control module to meet various ISS load demands. Tests of the EPCU in the Power Systems Facility testbed at GRC reveal that the overall converted-power efficiency, is approximately 89% with a nominal-input voltage of 12OVdc and a total load in the range of 4O% to 110% rated 28Vdc load. (The PCUs alone have an efficiency of approximately 94.5%). Furthermore, the EM unit passed all flight-qualification level (and beyond) vibration tests, passed ISS EMI (conducted, radiated. and susceptibility) requirements. successfully operated for extended periods in a thermal/vacuum chamber, was integrated with a proto-flight experiment and passed all stability and functional requirements.

  9. The Manitoba-Ontario intertie : perspectives of a merchant transmission developer

    International Nuclear Information System (INIS)

    Van Beers, R.

    2006-01-01

    This presentation discussed merchant transmission models for the Manitoba-Ontario intertie. Merchant transmission involves the reallocation of risk from rate payers to investors and facility users. Merchant transmission is now a niche market due to the fact that the power industry is now more centrally planned. However, merchant transmission structures limit the ability to fully assess congestion and nodal values, and governments continue to retain control of the power sector. Power generation and contracting trends are now changing as a result of market liberalization. In order to be successful, power merchants require financial markets that possess an understanding of the electricity sector. In a merchant transmission scenario, the sizing, timing, connection points, and tariffs will be determined by demonstrated commercial value, and not by central planning principles. The presentation included consideration of government block contracts and reverse block contracts. Details of the Montana-Alberta intertie project were also provided. tabs., figs

  10. Recent Progress in Electrical Insulation Techniques for HTS Power Apparatus

    Science.gov (United States)

    Hayakawa, Naoki; Kojima, Hiroki; Hanai, Masahiro; Okubo, Hitoshi

    This paper describes the electrical insulation techniques at cryogenic temperatures, i.e. Cryodielectrics, for HTS power apparatus, e.g. HTS power transmission cables, transformers, fault current limiters and SMES. Breakdown and partial discharge characteristics are discussed for different electrical insulation configurations of LN2, sub-cooled LN2, solid, vacuum and their composite insulation systems. Dynamic and static insulation performances with and without taking account of quench in HTS materials are also introduced.

  11. Profitability analysis of grid-connected photovoltaic facilities for household electricity self-sufficiency

    International Nuclear Information System (INIS)

    Colmenar-Santos, Antonio; Campíñez-Romero, Severo; Pérez-Molina, Clara; Castro-Gil, Manuel

    2012-01-01

    Spain exhibits a high level of energy dependence and has significant solar energy resources. These two facts have given rise to the prominence that renewable energy, particularly solar photovoltaic technology, has enjoyed in recent years, supported by a favorable regulatory framework. Currently, the Spanish Government is providing new ways in energy policy to enhance and accelerate the development of low-power photovoltaic generation facilities for self-consumption by introducing energy policies for feed-in payments of surplus electricity. Such facilities are an example of distributed electrical generation with important benefits for the environment and the rest of the electrical system because, when properly managed, they can help improve the system’s stability and reduce overall losses. By analyzing household demand and solar photovoltaic energy resources, the profitability of such facilities is considered in this article, taking into account the technical and economic impact of storage systems and proposing models for feed-in payments of surplus electricity, in an attempt to assess whether this method of electricity generation versus the method of conventionally supplied power from a grid at a regulated tariff can rival each other economically, in terms of parity. - Highlight: ► The use of grid-connected photovoltaic facilities for household electricity self-sufficiency is presented. ► The need for legal frameworks that include retributive mechanisms for the surplus energy is pointed out. ► Two models are proposed for the remuneration of surplus energy generated. ► Models show economic profitability without feed-in-tariff or compensations. ► Facilities described offer ancillary services for grid stability and smart-grid integration.

  12. Air quality and climate benefits of long-distance electricity transmission in China

    Science.gov (United States)

    Peng, Wei; Yuan, Jiahai; Zhao, Yu; Lin, Meiyun; Zhang, Qiang; Victor, David G.; Mauzerall, Denise L.

    2017-06-01

    China is the world’s top carbon emitter and suffers from severe air pollution. It has recently made commitments to improve air quality and to peak its CO2 emissions by 2030. We examine one strategy that can potentially address both issues—utilizing long-distance electricity transmission to bring renewable power to the polluted eastern provinces. Based on an integrated assessment using state-of-the-science atmospheric modeling and recent epidemiological evidence, we find that transmitting a hybrid of renewable (60%) and coal power (40%) (Hybrid-by-wire) reduces 16% more national air-pollution-associated deaths and decreases three times more carbon emissions than transmitting only coal-based electricity. Moreover, although we find that transmitting coal power (Coal-by-Wire, CbW) is slightly more effective at reducing air pollution impacts than replacing old coal power plants with newer cleaner ones in the east (Coal-by-Rail, CbR) (CbW achieves a 6% greater reduction in national total air-pollution-related mortalities than CbR), both coal scenarios have approximately the same carbon emissions. We thus demonstrate that coordinating transmission planning with renewable energy deployment is critical to maximize both local air quality benefits and global climate benefits.

  13. Modeling market power in electricity markets: Is the devil only in the details?

    Energy Technology Data Exchange (ETDEWEB)

    Bautista, Guillermo; Anjos, Miguel F.; Vannelli, Anthony

    2007-01-15

    Basic approximations of the transmission system are ubiquitous in the literature on modeling competition in electricity markets. Because the main concern of market power is with active power, reactive power and voltage-related issues are commonly neglected, even though they are inherent features of an electrical power system. However, the usefulness of stylized formulations that do not comprise these system elements may be severely limited. (author)

  14. Optimised deployment of hydro-power generation facilities

    International Nuclear Information System (INIS)

    Werlen, K.

    2004-01-01

    This article discusses how the opening-up of the European electricity market has led to the creation of more room for manoeuvre in the deployment of the generation capacity of dam and pumped-storage-based hydropower facilities and low-head power stations. Software tools for the optimisation of the operation of power generation facilities that can take care of complex hydraulic interdependencies are described. The use of the software for the assessment of new installations being planned or of older installations being extended is examined. The influence of climatic conditions, market prices for power, the general requirements placed on the system and other influences on financial gain are looked at. The article makes recommendations on those factors influencing the design of the software and for its optimal use in practice

  15. Magnet Lattice Design for the Transmission of Power Using Particle Beams

    Energy Technology Data Exchange (ETDEWEB)

    Marley, Daniel; /North Carolina State U. /SLAC

    2012-08-24

    As the amount of electricity generated by renewable energy sources continues to increase, the current method of power transmission will not serve as an adequate method for transmitting power over very long distances. A new method for transmitting power is proposed using particle beams in a storage ring. Particle beams offer an incredibly energy efficient alternative to transmission lines in transmitting power over very long distances. A thorough investigation of the magnet lattice design for this storage ring is presented. The design demonstrates the ability to design a ring with stable orbits over a 381.733 km circumference. Double bend achromats and FODO cells are implemented to achieve appropriate {beta} functions and dispersion functions for 9-11 GeV electron beams.

  16. Scenarios of power transmission networks; Cenarios de redes de transmissao de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Souza Fonseca, L.G. de; Savi, T C.O.; Morozowski Filho, M; Camargo, C C [ELETROSUL, Florianopolis, SC (Brazil)

    1985-12-31

    This work discusses the electrical network expansion considering long term horizons and a purpose of methodology for the establishment of transmission network scenarios. As part of the transmission scenario studies the network expansion problem is described by linearized power flow models and, for transmission system analysis and synthesis, the minimum effort criteria and interactive SINTRA program are used. 4 refs., 3 figs., 2 tabs.

  17. HVDC transmission from nuclear power plant

    International Nuclear Information System (INIS)

    Yoshida, Yukio; Takenaka, Kiyoshi; Taniguchi, Haruto; Ueda, Kiyotaka

    1980-01-01

    HVDC transmission directly from a nuclear power plant is expected as one of the bulk power transmission systems from distant power generating area. Successively from the analysis of HVDC transmission from BWR-type nuclear power plant, this report discusses dynamic response characteristics of HVDC transmission (double poles, two circuits) from PWR type nuclear power plant due to dc-line faults (DC-1LG, 2LG) and ac-line faults (3LG) near inverter station. (author)

  18. CALCULATION METHOD OF ELECTRIC POWER LINES MAGNETIC FIELD STRENGTH BASED ON CYLINDRICAL SPATIAL HARMONICS

    Directory of Open Access Journals (Sweden)

    A.V. Erisov

    2016-05-01

    Full Text Available Purpose. Simplification of accounting ratio to determine the magnetic field strength of electric power lines, and assessment of their environmental safety. Methodology. Description of the transmission lines of the magnetic field by using techniques of spatial harmonic analysis in the cylindrical coordinate system is carried out. Results. For engineering calculations of electric power lines magnetic field with sufficient accuracy describes their first spatial harmonic magnetic field. Originality. Substantial simplification of the definition of the impact of the construction of transmission line poles on the value of its magnetic field and the bands of land alienation sizes. Practical value. The environmentally friendly projection electric power lines on the level of the magnetic field.

  19. Long-distance power transmission technology. Microwave power transmission; Denryoku no chokyori yuso gijutsu. Micro ha musen soden

    Energy Technology Data Exchange (ETDEWEB)

    Kaya, N [Kobe University, Kobe (Japan). Faculty of Engineering

    1994-11-05

    This paper explains the principles of microwave power transmission as a long-distance power transmission technology, and the status of its development. Under an assumption of using a wave length of 12 cm (2.45 GHz) and a transmission distance of 1 km, an ideal wireless power transmission can realize transmitting the power at an efficiency of 95% or higher if transmitting and receiving antennas with a radius of 8.8 m are used. What remains as important requirements is raising the efficiency of conversion from power supply into microwaves, and the efficiency of rectification after the power has been received. By using microwave energy sent from a transmission antenna installed on the roof of an automobile, a model airplane with a receiving antenna installed at its rear flew successfully for 40 seconds under the microwave lifted airplane experiment (MILAX). In an experiment of transmitting microwave power in space, power was successfully transmitted to the child rocket as an event under the International Space Year - Microwave Energy Transmission in Space (ISY-METS). The microwave wireless power transmission on the ground would have a possibility of taking over the overhead line transmission into islands. An attempt is scheduled to send power of 5 kW by using transmission and receiving antennas with a diameter of 3 m to investigate effects on transmission efficiency, and communications and electromagnetic environments, and to collect basic data. 3 refs., 3 figs.

  20. Present state of electric power business in United States and Europe

    International Nuclear Information System (INIS)

    Onishi, Kenichi

    2011-01-01

    This article reported present state of nuclear power and electric power business in United States and Europe after Fukushima Daiichi Accident. As for the trend of demand and supply of electric power and policy, the accident forced Germany possibly to proceed with phase-out of nuclear power, but France and United States to sustain nuclear power with no great change of energy policy at this moment. As for the trend of electric power market, there was not state in United States with liberalized retail market of electric power after rolling blackouts occurred in California State in the early 2000s. In Germany proceeding with renewable energy introduction, renewable electricity fed into the grid was paid for by the network operators at fixed tariffs and the costs passed on to electricity consumers were increasing. Renewable Portfolio Standards (RPS) in United States forced the state to introduction of renewable energy to some ratio, and Feed-in Tariff (FIT) introduced in EU in 1990s lead to introduction of a large amount of renewable electricity targeted in 2020. Huge amount of wind power introduction brought about several problems to solve such that excess electric power above domestic demand had bad effects on grids in neighboring region. Enforcement of power transmission lines was also needed with increase of maximum electric power as well as introduction of a large amount of renewable electricity. (T. Tanaka)

  1. Electricity transmission congestion costs: A review of recent reports

    Energy Technology Data Exchange (ETDEWEB)

    Lesieutre, Bernard C.; Eto, Joseph H.

    2003-10-01

    Recently, independent system operators (ISOs) and others have published reports on the costs of transmission congestion. The magnitude of congestion costs cited in these reports has contributed to the national discussion on the current state of U.S. electricity transmission system and whether it provides an adequate platform for competition in wholesale electricity markets. This report reviews reports of congestion costs and begins to assess their implications for the current national discussion on the importance of the U.S. electricity transmission system for enabling competitive wholesale electricity markets. As a guiding principle, we posit that a more robust electricity system could reduce congestion costs; and thereby, (1) facilitate more vibrant and fair competition in wholesale electricity markets, and (2) enable consumers to seek out the lowest prices for electricity. Yet, examining the details suggests that, sometimes, there will be trade-offs between these goals. Therefore, it is essential to understand who pays, how much, and how do they benefit in evaluating options (both transmission and non-transmission alternatives) to address transmission congestion. To describe the differences among published estimates of congestion costs, we develop and motivate three ways by which transmission congestion costs are calculated in restructured markets. The assessment demonstrates that published transmission congestion costs are not directly comparable because they have been developed to serve different purposes. More importantly, critical information needed to make them more comparable, for example in order to evaluate the impacts of options to relieve congestion, is sometimes not available.

  2. Transmission of electric dipole radiation through an interface

    Energy Technology Data Exchange (ETDEWEB)

    Arnoldus, Henk F., E-mail: hfa1@msstate.edu [Department of Physics and Astronomy, Mississippi State University, P.O. Drawer 5167, Mississippi State, MS 39762-5167 (United States); Berg, Matthew J., E-mail: matt.berg@msstate.edu [Department of Physics and Astronomy, Mississippi State University, P.O. Drawer 5167, Mississippi State, MS 39762-5167 (United States); Li, Xin, E-mail: Xin.Li@millersville.edu [Department of Physics, P.O. Box 1002, Millersville University, Millersville, PA 17551 (United States)

    2014-02-07

    We consider the transmission of electric dipole radiation through an interface between two dielectrics, for the case of a vertical dipole. Energy flows along the field lines of the Poynting vector, and in the optical near field these field lines are curves (as opposed to optical rays). When the radiation passes through the interface into a thicker medium, the field lines bend to the normal (as rays do), but the transmission angle is not related to the angle of incidence. The redirection of the radiation at the interface is determined by the angle dependence of the transmission coefficient. This near-field redistribution is responsible for the far-field angular power pattern. When the transmission medium is thinner than the embedding medium of the dipole, some energy flows back and forth through the interface in an oscillating fashion. In each area where field lines dip below the interface, an optical vortex appears just above the interface. The centers of these vortices are concentric singular circles around the dipole axis.

  3. Electric power monthly. June 1966 with data for March 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    This publication presents monthly electricity statistics for a wide audience including Congress, Federal and state agencies, the electric utility industry, and the general public, with the purpose of providing energy decisionmakers with accurate, timely information that may be used in forming various perspectives on electric issues that lie ahead. EIA collected the information in this report to fulfill its data collection and dissemination responsibilities (Public Law 93-275). A section on upgrading transmission capacity for wholesale electric power trade is included. The tables include US electric power at a glance, utility net generation, utility consumption of fossil fuels, fossil-fuel stocks/receipts/cost at utilities, utility sales/revenue/revenue per kWh, and monthly plant aggregates.

  4. Electric power distribution. 5th Rev. Ed. Elektrische Energieverteilung

    Energy Technology Data Exchange (ETDEWEB)

    Flosdorff, R; Hilgarth, G

    1986-01-01

    The first chapter on electric power supply networks discusses transmitting media, their characteristic values, and the dimensioning of electric lines and networks; cables are given particular attention. High-voltage d.c. transmission and reactive power compensation are discussed. The next chapter describes the calculation of short-circuits and earth leakages for various neutral circuits on the basis of symmetric components. The newly introduced mesh current method for complex calculation of electric networks makes use of the potential of pocket computers. Chapter 3 discusses protective devices, i.e. earth systems and electronic protection. The next two chapters describe switch gear and power plants, including recent technical changes. The final chapter, which discusses the electric power industry, has been rewritten and extended. Methods of calculation, e.g. annual cost and cash value, are applied to transmitting media and plants. There is an extensive appendix with characteristic values of cables and overhead lines, graphical symbols, distinguishing signs of wiring diagrams, a bibliography of books, DIN standards, VDE specifications, and formulas.

  5. Nuclear reactor capable of electric power generation during in-service inspection

    International Nuclear Information System (INIS)

    Nakamura, Shinsuke; Nogami, Hitoshi.

    1992-01-01

    The nuclear power plant according to the present invention can generate electric power even in a period when one of a pair of reactors is put to in-service inspection. That is, the nuclear power plant of the present invention comprises a system constitution of two nuclear reactors each of 50% thermal power and one turbine power generator of 100% electric power. Further, facilities of various systems relevant to the two reactors each of 50% thermal power, as a pair, are used in common as much as possible in order to reduce the cost for construction and maintenance/ inspection. Further, a reactor building and a turbine building disposed in adjacent with each for paired two reactors each of 50% thermal power are arranged vertically. This arrangement can facilitate the common use of the facilities for various systems and equipments to attain branching and joining of fluids in reactor feed water systems and main steam system pipelines easily with low pressure loss and low impact shocks. The facility utilization factor of such reactors is remarkably improved by doubling the period of continuous power generation. As a result, economic property is remarkably improved. (I.S.)

  6. Implantable power generation system utilizing muscle contractions excited by electrical stimulation.

    Science.gov (United States)

    Sahara, Genta; Hijikata, Wataru; Tomioka, Kota; Shinshi, Tadahiko

    2016-06-01

    An implantable power generation system driven by muscle contractions for supplying power to active implantable medical devices, such as pacemakers and neurostimulators, is proposed. In this system, a muscle is intentionally contracted by an electrical stimulation in accordance with the demands of the active implantable medical device for electrical power. The proposed system, which comprises a small electromagnetic induction generator, electrodes with an electrical circuit for stimulation and a transmission device to convert the linear motion of the muscle contractions into rotational motion for the magneto rotor, generates electrical energy. In an ex vivo demonstration using the gastrocnemius muscle of a toad, which was 28 mm in length and weighed 1.3 g, the electrical energy generated by the prototype exceeded the energy consumed for electrical stimulation, with the net power being 111 µW. It was demonstrated that the proposed implantable power generation system has the potential to replace implantable batteries for active implantable medical devices. © IMechE 2016.

  7. Preliminary assessment of the tradeoffs between the electric motor and the transmission in electric vehicles

    Science.gov (United States)

    Levi, E.

    1983-01-01

    The efficiency, weight, and cost of various propulsion system for 4-passenger electric vehicles are compared. These systems comprise the electric motor and the required speed reducing transmission to obtain the appropriate speed at the wheel. Three types of motors, dc synchronous, and squirrel-cage were considered at 6000 ycm and 24 000 rpm for a peak power of 40 kW. Two types of gearing selected were a single speed differential and a differential with a differential with a 4-speed gearbox. Only components that were readily realizable within present state-of-the-art were considered.

  8. The enforcement order for the law for arrangement of surrounding areas of power generating facilities

    International Nuclear Information System (INIS)

    1977-01-01

    The Order is based on the prescriptions of the Law for the Arrangement of Surrounding Areas of Power Generating Facilities. Those establishing power generating facilities are general and wholesale electric enterprisers provided for by the Electricity Enterprises Act as well as the Power Reactor and Nuclear Fuel Development Corporation. The generating capacity is specified as 350,000 kilowatts for nuclear and steam power generating facilities, 150,000 kilowatts for those set up by the Corporation, 100,000 kilowatts for those using coal as main fuel, and 10,000 kilowatts for water power generation and geothermal plants. The facilities closely connected to nuclear power generation include the reprocessing facilities and test and examination facilities for nuclear fuel materials used for power-generating nuclear reactors, reactors used for the research on the safety of power generating reactors, and experimental reactors for fast breeder reactors. The public facilities consist of communication facilities, and the facilities for sports and recreations, environmental hygiene, education and culture, medicine, social welfare, fire fighting, etc. Prefectural governors ought to file the arrangement plans to the competent minister through the Minister of International Trade and Industry to get the permission prescribed by the Law. The subsidy is not granted to the expenses of the enterprises undertaken by the nation or those enterprises, a part of the expenses of which is borne or subsidized by the nation. (Okada, K.)

  9. Pricing transmission services

    International Nuclear Information System (INIS)

    Haaden, E.

    1995-01-01

    The price structure for transmission of electric power through the main lines in Sweden is analyzed. After deregulation of the electricity market, the main transmission lines are owned by a separate national company, with no interests from the power producers. Comparisons are made to ideal marginal price structures. 6 refs

  10. Ethics on the TEPCO bankruptcy, nuclear power plants and regulatory reform in the electric power industry

    International Nuclear Information System (INIS)

    Koga, Shigeaki

    2013-01-01

    Although regulatory reform in the electric power industry had been considered as part of social system reform like in the finance and communications to liberalize the market, there still continued to exist regional monopoly, integrated system for power generation, transmission and distribution, and lack of competition. The Fukushima accident showed such electric power system was unethical as social system compared to ordinary industries, because electric power company getting profit could not be prepared for nuclear damage liability and would burden third unrelated parties with risk. Electric power company should be forced to insure nuclear power plants for nuclear accidents. Otherwise restart of nuclear power plant operation should not be allowed. Nuclear power had been justified to be entitled grant or subsidy from the government for public good, which would be unfair to people. This article presented speeding-up scheme of Fukushima accident treatment leading to TEPCO bankruptcy and discussed measures against concerns or comments about bankruptcy procedures, major part of which might be mitigation of fund-raising fear by government support. At the proceeding of bankruptcy procedure including spinning off of separate companies, regulatory reform in the electric power industry could be taken in advanced. (T. Tanaka)

  11. Salt Lake City Area Integrated Projects electric power marketing final environmental impact statement. Volume 4: Appendixes B-D

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alter native

  12. Salt Lake City Area Integrated Projects electric power marketing -- Final environmental impact statement. Volume 2: Sections 1--16

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Service Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alternative

  13. Electrical energy market management in deregulated power system

    International Nuclear Information System (INIS)

    Abady, A. F.; Niknam, T.

    2003-01-01

    For many decades, vertically integrated electric utilities monopolized the way they control, sell and distribute electricity to customers in their service territories. In this monopoly, each utility managed three main components of the system: generation, transmission and distribution. Analogous to perceived competitions in airline, communication and natural gas industries which demonstrated that vertically integrated monopolies could not provide services as efficiently as competitive firms, the electric power industry plans to improve its efficiency by providing a more reliable energy at least cost to customers. A competition is guaranteed by establishing a restructured environment in which customers could choose to buy from different suppliers and change suppliers as they wish in order to pay market base rates. This paper is dealing with progressive approach of restructuring in power and introduce ISO, its functions and model of electrical energy markets

  14. Advances in Optimizing Weather Driven Electric Power Systems.

    Science.gov (United States)

    Clack, C.; MacDonald, A. E.; Alexander, A.; Dunbar, A. D.; Xie, Y.; Wilczak, J. M.

    2014-12-01

    The importance of weather-driven renewable energies for the United States (and global) energy portfolio is growing. The main perceived problems with weather-driven renewable energies are their intermittent nature, low power density, and high costs. The National Energy with Weather System Simulator (NEWS) is a mathematical optimization tool that allows the construction of weather-driven energy sources that will work in harmony with the needs of the system. For example, it will match the electric load, reduce variability, decrease costs, and abate carbon emissions. One important test run included existing US carbon-free power sources, natural gas power when needed, and a High Voltage Direct Current power transmission network. This study shows that the costs and carbon emissions from an optimally designed national system decrease with geographic size. It shows that with achievable estimates of wind and solar generation costs, that the US could decrease its carbon emissions by up to 80% by the early 2030s, without an increase in electric costs. The key requirement would be a 48 state network of HVDC transmission, creating a national market for electricity not possible in the current AC grid. These results were found without the need for storage. Further, we tested the effect of changing natural gas fuel prices on the optimal configuration of the national electric power system. Another test that was carried out was an extension to global regions. The extension study shows that the same properties found in the US study extend to the most populous regions of the planet. The extra test is a simplified version of the US study, and is where much more research can be carried out. We compare our results to other model results.

  15. Electrical energy in France 2002; Energie electrique en France 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-12-01

    This report presents the provisional results of power flows on the French power system (RTE) in 2002: generation, national consumption, physical exchanges with foreign countries (instantaneous exchange balances measured by metering on each interconnection line, recorded as imports or exports, depending on the sign), adjusted consumption (for climate contingencies and leap years), energy balance (generated and imported, consumed), noteworthy data (all flows on the RTE network as well as generation auto-consumed by the industrial customers connected to this network), electricity market (contractual exchanges with foreign countries, base load blocks exchanged between balance responsible entities), power facilities (thermal, hydro-, transmission lines), main transmission facilities commissioned during the year (interconnections between France and Spain, Italy, Germany and Belgium). (J.S.)

  16. Impacts on investments, and transmission/distribution loss through power sector reforms

    International Nuclear Information System (INIS)

    Nagayama, Hiroaki

    2010-01-01

    This study analyses original panel data from 86 countries between 1985 and 2006. Econometric methods were used to identify the effects of different policy devices of power sector reforms on performance indicators (installed capacity per capita, transmission and distribution loss) in the countries analyzed. The research findings suggest that reform variables such as the entry of independent power producers (IPPs), unbundling of generation and transmission, establishment of regulatory agencies, and the introduction of a wholesale spot market are the driving forces of increasing generation capacity, as well as reducing transmission and distribution loss in the respective regions. In this study, we can assume that, firstly, different electric industry's reform policies/measures have different impacts on geographically and economically diverse countries. Secondly, a country's state of economic development has a different impact on policy effects of reforms. Thirdly, coexistent with independent regulatory agencies, reform policy becomes more powerful in realizing sector performances.

  17. Research on hybrid transmission mode for HVDC with optimal thermal power and renewable energy combination

    Science.gov (United States)

    Zhang, Jinfang; Yan, Xiaoqing; Wang, Hongfu

    2018-02-01

    With the rapid development of renewable energy in Northwest China, curtailment phenomena is becoming more and more serve owing to lack of adjustment ability and enough transmission capacity. Based on the existing HVDC projects, exploring the hybrid transmission mode associated with thermal power and renewable power will be necessary and important. This paper has proposed a method on optimal thermal power and renewable energy combination for HVDC lines, based on multi-scheme comparison. Having established the mathematic model for electric power balance in time series mode, ten different schemes have been picked for figuring out the suitable one by test simulation. By the proposed related discriminated principle, including generation device utilization hours, renewable energy electricity proportion and curtailment level, the recommendation scheme has been found. The result has also validated the efficiency of the method.

  18. Progress of technological innovation on electric power in FY2014

    International Nuclear Information System (INIS)

    Nishikawa, Yoshikazu; Fujii, Yutaka; Sasagawa, Toshiro

    2015-01-01

    This paper overviews the technological development in FY2014 at Tokyo Electric Power Company, Chubu Electric Power Company, Hokuriku Electric Power Company, Shikoku Electric Power Company, and Electric Power Development Company. In this overview, further breakdown was made for the following departments of each company: nuclear power generation, thermal power generation, hydraulic power generation, power transmission, power distribution, transformation, research and development and technological development, and information and communication. In addition, this paper outlines the achievement of technological development at Japan Atomic Power Company, such as the technological development related to the existing power station, development of new technology, and the development of future reactor. Fukushima Daiichi Nuclear Power Station has developed an investigative system using a high altitude survey robot and a movable monitoring system. Hamaoka Nuclear Power Station examined the feasibility of state diagnostic technique based on multi-point analysis, and studied stress corrosion cracking at the newly established Nuclear Safety Research Laboratory. Shika Nuclear Power Station (Unit 1) applied a pipe stress improvement process by means of high frequency induction heating as a stress corrosion cracking countermeasure. Ikata Nuclear Power Station newly adopted high degree cross-linking cation resin, and high cracking strength anion resin as the primary resins. Oma Nuclear Power Station worked on the all reactor core utilization technology of MOX fuel. (A.O.)

  19. Space Weather Effects on Current and Future Electric Power Systems

    Science.gov (United States)

    Munoz, D.; Dutta, O.; Tandoi, C.; Brandauer, W.; Mohamed, A.; Damas, M. C.

    2016-12-01

    This work addresses the effects of Geomagnetic Disturbances (GMDs) on the present bulk power system as well as the future smart grid, and discusses the mitigation of these geomagnetic impacts, so as to reduce the vulnerabilities of the electric power network to large space weather events. Solar storm characterized by electromagnetic radiation generates geo-electric fields that result in the flow of Geomagnetically Induced Currents (GICs) through the transmission lines, followed by transformers and the ground. As the ground conductivity and the power network topology significantly vary with the region, it becomes imperative to estimate of the magnitude of GICs for different places. In this paper, the magnitude of GIC has been calculated for New York State (NYS) with the help of extensive modelling of the whole NYS electricity transmission network using real data. Although GIC affects only high voltage levels, e.g. above 300 kV, the presence of coastline in NYS makes the low voltage transmission lines also susceptible to GIC. Besides this, the encroachment of technologies pertaining to smart grid implementation, such as Phasor Measurement Units (PMUs), Microgrids, Flexible AC Transmission System (FACTS), and Information and Communication Technology (ICT) have been analyzed for GMD impacts. Inaccurate PMU results due to scintillation of GPS signals that are affected by electromagnetic interference of solar storm, presence of renewable energy resources in coastal areas that are more vulnerable to GMD, the ability of FACTS devices to either block or pave new path for GICs and so on, shed some light on impacts of GMD on smart grid technologies.

  20. Induced voltages in metallic pipelines near power transmission lines

    International Nuclear Information System (INIS)

    Grcev, Leonid; Jankov, Voislav; Filiposki, Velimir

    2002-01-01

    With the continuous development of the electric power system and the pipeline networks used to convey oil or natural gas, cases of close proximity of high voltage structures and metallic pipelines become more and more frequent. Accordingly there is a growing concern about possible hazards resulting from voltages induced in the metallic pipelines by magnetic coupling with nearby power transmission lines. This paper presents a methodology for computation of the induced voltages in buried isolated metallic pipelines. A practical example of computation is also presented. (Author)

  1. American power conference: Proceedings. Volume 56-I

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    The first volume of this conference contains papers on the following topics: (1) Controls, monitoring, and expert systems (Harnessing microprocessor revolution for a more competitive power industry; Plant control--Upgrades; Neural network applications); (2) Diversification and globalization (Electric utility diversification/globalization--Panel; Private power in developing countries); (3) Environment and clean air (Clean Air compliance costs; Site selection for power stations and related facilities; Electric utility trace substance emissions; Solid waste disposal and commercial use; Precipitators/fabric filters; and Effect of flow modifications on fisheries and water quality); (4) Generation--Fuel options ampersand equipment (Alternate fuels; Advances in fuel cells for electric power applications; Secondary containment and seismic requirements for petrochemical facilities; Clean coal technology demonstration; Advanced energy systems; Hydropower); (5) Nuclear operations ampersand options (Radioactive waste management and disposal; Off normal conditions; Advanced light water reactors--15 years after TMI; Structural dynamic analyses for nuclear power plants); (6) Retrofit, betterment, repowering ampersand maintenance (Project management; Improving competitiveness through process re-engineering; Central stations; Water and wastewater treatment); (7) System planning, operation ampersand demand maintenance (Transmission system access; Stability; Systems planning); (8) Transmission and distribution (Transformers; Relaying for system protection; Managing EMF effects); and (9) Education (Power engineering). 155 papers have been processed separately for inclusion on the data base

  2. The effect of Ontario's transmission system policies on cogeneration projects

    International Nuclear Information System (INIS)

    Carr, J.

    1999-01-01

    The impact that the establishment of transmission tariffs would have on the viability of cogeneration projects in Ontario was discussed. The proposal to establish such tariffs on the basis of a 'postage stamp' rate would ensure that all electricity users have access to electricity at the same price. However, this would unfairly penalize short-haul transmission transactions and would possibly result in the inappropriate location of new generation facilities. Electricity users would ultimately be burdened with these inefficiencies. This presentation also discussed another public policy which proposes to determine what parts of the electricity system should have their costs recovered at postage stamp rates. The costs would include not only transmission charges but also distribution and generation costs. The restructuring of Ontario Hydro into the Ontario Power Generation Company (OPGC) and the Ontario Hydro Services Company (OHSC) and its impact on the cogeneration projects was also discussed

  3. Coordinated parallel and series flexible AC transmission systems (FACTS) to support a power grid with a large amount of wind power

    Energy Technology Data Exchange (ETDEWEB)

    Mora-Cantallops, Marcal; Gomis-Bellmunt, Oriol; Sumper, Andreas; Rull-Duran, Joan [Univ. Politecnica de Catalunya, Barcelona (ES). Centre d' Innovacio Tecnologica en Convertidors Estatics i Accionaments (CITCEA-UPC)

    2009-07-01

    Wind power constitutes one of the more viable alternatives to conventional power generation technology. In the previous years, wind power penetration on electric grids has grown notably, and has brought several new issues related to its integration into power grids. Flexible AC Transmission Systems (FACTS) installed in the right place and controlled conveniently are able to mitigate and solve many of these issues. In the present work, a STATCOM and a SSSC are used coordinately to fully support an electric grid. Simulations include normal and fault operation. (orig.)

  4. The evolution of the electric power market towards competition

    International Nuclear Information System (INIS)

    Puerta, J.F.; Arceluz, J.F.

    1995-01-01

    The changes introduced in the electric power industry aiming at improving the systems' efficiency are presented. These changes will make the generation, transmission and distribution activities competitive. The advantages and disadvantages of these initiatives and their economic and cultural contexts are analysed

  5. Integrated Multimedia Based Intelligent Group Decision Support System for Electrical Power Network

    OpenAIRE

    Ajay Kumar Saxena; S. 0. Bhatnagar; P. K Saxena

    2002-01-01

    Electrical Power Network in recent time requires an intelligent, virtual environment based decision process for the coordination of all its individual elements and the interrelated tasks. Its ultimate goal is to achieve maximum productivity and efficiency through the efficient and effective application of generation, transmission, distribution, pricing and regulatory systems. However, the complexity of electrical power network and the presence of conflicting multiple goals and objectives p...

  6. Measuring the competitiveness benefits of a transmission investment policy: The case of the Alberta electricity market

    International Nuclear Information System (INIS)

    Wolak, Frank A.

    2015-01-01

    Transmission expansions can increase the extent of competition faced by wholesale electricity suppliers with the ability to exercise unilateral market power. This can cause them to submit offer curves closer to their marginal cost curves, which sets market-clearing prices closer to competitive benchmark price levels. These lower wholesale market-clearing prices are the competitiveness benefit consumers realize from the transmission expansion. This paper quantifies empirically the competitiveness benefits of a transmission expansion policy that causes strategic suppliers to expect no transmission congestion. Using hourly generation-unit level offer, output, market-clearing price and congestion data from the Alberta wholesale electricity market from January 1, 2009 to July 31, 2013, an upper and lower bound on the hourly consumer competitiveness benefits of this transmission policy is computed. Both of these competitiveness benefits measures are economically significant, which argues for including them in transmission planning processes for wholesale electricity markets to ensure that all transmission expansions with positive net benefits to electricity consumers are undertaken. -- Highlights: •Define competitiveness benefits to consumers from transmission expansions in wholesale market. •Compute upper and lower bounds on competitiveness benefits for Alberta market. •Compare no-perceived congestion prices to actual prices to measure competitiveness benefits. •Economically substantial competitiveness benefits found for sample period studied. •To ensure adequate transmission, planning processes should account for these benefits

  7. Transmission-line-circuit model of an 85-TW, 25-MA pulsed-power accelerator

    OpenAIRE

    B. T. Hutsel; P. A. Corcoran; M. E. Cuneo; M. R. Gomez; M. H. Hess; D. D. Hinshelwood; C. A. Jennings; G. R. Laity; D. C. Lamppa; R. D. McBride; J. K. Moore; A. Myers; D. V. Rose; S. A. Slutz; W. A. Stygar

    2018-01-01

    We have developed a physics-based transmission-line-circuit model of the Z pulsed-power accelerator. The 33-m-diameter Z machine generates a peak electrical power as high as 85 TW, and delivers as much as 25 MA to a physics load. The circuit model is used to design and analyze experiments conducted on Z. The model consists of 36 networks of transmission-line-circuit elements and resistors that represent each of Zs 36 modules. The model of each module includes a Marx generator, intermediate-en...

  8. New plans for increasing transmission and intertie capacity : moving towards a more integrated power market in Atlantic Canada

    International Nuclear Information System (INIS)

    Roberge, F.

    2003-01-01

    This PowerPoint presentation provided a brief review of the electric power industry in Quebec after deregulation. It included an outline of non-regulated activity and regulated activities in terms of power generation, transmission, distribution and customer service. Both the transmission and distribution components of the power industry in Quebec are regulated by the Regie de l'energie. Transmission networks offer access to all wholesalers. Quebec does not have an energy spot market and electricity prices are currently very low. Hydro-Quebec TransEnergie was created in 1997 as a functionally independent open access transmission provider with high reliability standards. TransEnergie can address seams issues with neighbouring networks. The three types of services offered in terms of tariffs were also discussed in this presentation along with data regarding Hydro-Quebec assets, revenue and net income. Hydro-Quebec's relation with the Atlantic provinces were also described. Interconnection with New Brunswick totals 785 MW. No new interconnection is planned. 1 tab., 4 figs

  9. Information management system for the analysis of the program of electric power transmission construction; Sistema gerencial de informacao para analise do programa de obras de transmissao

    Energy Technology Data Exchange (ETDEWEB)

    Peres, Luiz A. Pecorelli; Lima Junior, Moacir P.; Kayat, Julio; Berer, Ricardo; Sondermann, Luiz O. [FURNAS, Rio de Janeiro, RJ (Brazil)

    1993-12-31

    The management of an implementation and coordination program for electric power transmission lines construction needs to have access to up to date information in several areas. Aiming to attend these basic requisites a data base computer program was developed. This work describes such program 7 refs., 4 figs.

  10. Optimal utilization of electric power in the Nordic countries

    International Nuclear Information System (INIS)

    Magnusson, G.; Gjelsvik, E.

    1992-01-01

    It is attempted to address the questions of which advantages the equilibrium solution would have for the energy market under free trade conditions, how Nordic electric power can be used optimally and what the trading pattern looks like, which kind of competition the transmission of electricity via cables to Iceland and other Nordic countries will meet in the United Kingdom (UK) and the Continent, how high the option values are of trading with electric power via cables from, for example, Iceland to the UK and how great the profit could be from a more effective use of electricity for aluminium production in Norway and Iceland. Data are given on consumer prices for 1990 in Scandinavia, Germany and the UK, and a few graphs and a map illustrate the text. (AB)

  11. A control-oriented simulation model of a power-split hybrid electric vehicle

    International Nuclear Information System (INIS)

    Cipek, Mihael; Pavković, Danijel; Petrić, Joško

    2013-01-01

    Highlights: ► A simulation model of a two mode power-split hybrid electric vehicle (HEV) is proposed. ► Modeling the energy losses in the HEV transmission components are presented. ► The control optimization model implementation aspects are discussed. -- Abstract: A simulation model of a two mode power-split hybrid electric vehicle (HEV) is proposed in this paper for the purpose of HEV dynamics analysis and control system design. The bond graph methodology is used to model dominant dynamic effects of the mechanical part of the HEV transmission. Simple quasi-static battery model, the environment model, the tire and the power losses model of a vehicle are included, as well. A low-level electric generator speed control loop is designed, which includes a PI controller tuned according to the symmetrical optimum tuning procedure. Finally, off-line optimization by conjugate gradient-based BPTT-like optimal control algorithm, which is based on the presented mathematical model, is also given in the paper.

  12. Electromagnetic Interference Issues of A Wireless Power Transmission Converter

    DEFF Research Database (Denmark)

    Khazraj, Hesam; Haji Bashi, Mazaher; Silva, Filipe Miguel Faria da

    2018-01-01

    field and the leakage current flowing through stray capacitors. In this paper, the EMI of wireless power transmission technology is highlighted and for the first time evaluated from a new perspective. The possible parasitic paths are identified simply. Additionally, effective high-frequency models......Many recent studies have focused on the inductive charging to transfer electrical power from a source to batteries without any electrical interface. The main problem with them is that inductive charging technologies may have electromagnetic compatibility (EMC) issues caused by the leakage magnetic...... for each part of the inductive charger are presented. At the first, the lowest EMI technology for wireless charging is chosen and simulated. To overcome the EMI and leakage current problems, this paper also suggests using a new passive EMI filter topology. Simulation results show the necessity...

  13. ELMO model predicts the price of electric power; ELMO-malli saehkoen hinnan ennustamiseksi

    Energy Technology Data Exchange (ETDEWEB)

    Antila, H. [Electrowatt-Ekono Oy, Helsinki (Finland)

    2001-07-01

    Electrowatt-Ekono has developed a new model, by which it is possible to make long-term prognoses on the development of electricity prices in the Nordic Countries. The ELMO model can be used as an analysis service of the electricity markets and estimation of the profitability of long-term power distribution contracts with different scenarios. It can also be applied for calculation of technical and economical fundamentals for new power plants, and for estimation of the effects of different taxation models on the emissions of power generation. The model describes the whole power generation system, the power and heat consumption and transmission. The Finnish power generation system is based on the Electrowatt-Ekono's boiler database by combining different data elements. Calculation is based on the assumption that the Nordic power generation system is used optimally, and that the production costs are minimised. In practise the effectively operated electricity markets ensure the optimal use of the production system. The market area to be described consists of Finland and Sweden. The spot prices have long been the same. Norway has been treated as a separate market area. The most potential power generation system, the power consumption and the power transmission system are presumed for the target year during a normal rainfall situation. The basic scenario is calculated on the basis of the preconditional data. The calculation is carried out on hourly basis, which enables the estimation of the price variation of electric power between different times during the day and seasons. The system optimises the power generation on the basis of electricity and heat consumption curves and fuel prices. The result is an hourly limit price for electric power. Estimates are presented as standard form reports. Prices are presented as average annuals, in the seasonal base, and in hourly or daily basis for different seasons.

  14. DESIGN AND DEVELOPMENT OF A 1/3 SCALE VERTICAL AXIS WIND TURBINE FOR ELECTRICAL POWER GENERATION

    Directory of Open Access Journals (Sweden)

    Altab Md. Hossain

    2007-12-01

    Full Text Available This research describes the electrical power generation in Malaysia by the measurement of wind velocity acting on the wind turbine technology. The primary purpose of the measurement over the 1/3 scaled prototype vertical axis wind turbine for the wind velocity is to predict the performance of full scaled H-type vertical axis wind turbine. The electrical power produced by the wind turbine is influenced by its two major part, wind power and belt power transmission system. The blade and the drag area system are used to determine the powers of the wind that can be converted into electric power as well as the belt power transmission system. In this study both wind power and belt power transmission system has been considered. A set of blade and drag devices have been designed for the 1/3 scaled wind turbine at the Thermal Laboratory of Faculty of Engineering, Universiti Industri Selangor (UNISEL. Test has been carried out on the wind turbine with the different wind velocities of 5.89 m/s, 6.08 m/s and 7.02 m/s. From the experiment, the wind power has been calculated as 132.19 W, 145.40 W and 223.80 W. The maximum wind power is considered in the present study.

  15. DESIGN AND DEVELOPMENT OF A 1/3 SCALE VERTICAL AXIS WIND TURBINE FOR ELECTRICAL POWER GENERATION

    Directory of Open Access Journals (Sweden)

    Altab Hossain

    2007-01-01

    Full Text Available This research describes the electrical power generation in Malaysia by the measurement of wind velocity acting on the wind turbine technology. The primary purpose of the measurement over the 1/3 scaled prototype vertical axis wind turbine for the wind velocity is to predict the performance of full scaled H-type vertical axis wind turbine. The electrical power produced by the wind turbine is influenced by its two major part, wind power and belt power transmission system. The blade and the drag area system are used to determine the powers of the wind that can be converted into electric power as well as the belt power transmission system. In this study both wind power and belt power transmission system has been considered. A set of blade and drag devices have been designed for the 1/3 scaled wind turbine at the Thermal Laboratory of Faculty of Engineering, Universiti Industri Selangor (UNISEL. Test has been carried out on the wind turbine with the different wind velocities of 5.89 m/s, 6.08 m/s and 7.02 m/s. From the experiment, the wind power has been calculated as 132.19 W, 145.40 W and 223.80 W. The maximum wind power is considered in the present study.

  16. Economic impact assessment and operational decision making in emission and transmission constrained electricity markets

    International Nuclear Information System (INIS)

    Nanduri, Vishnu; Kazemzadeh, Narges

    2012-01-01

    Highlights: ► We develop a bilevel game-theoretic model for allowance and electricity markets. ► We solve the model using a reinforcement learning algorithm. ► Model accounts for transmission constraints, cap-and-trade constraints. ► Study demonstrated on 9-bus electric power network. ► Obtain insights about supply shares, impact of transmission constraints, and cost pass through. -- Abstract: Carbon constrained electricity markets are a reality in 10 northeastern states and California in the US, as well as the European Union. Close to a Billion US Dollars have been spent by entities (mainly generators) in the Regional Greenhouse Gas Initiative in procuring CO 2 allowances to meet binding emissions restrictions. In the near future, there are expected to be significant impacts due to the cap-and-trade program, especially when the cap stringency increases. In this research we develop a bilevel, complete-information, matrix game-theoretic model to assess the economic impact and make operational decisions in carbon-constrained restructured electricity markets. Our model is solved using a reinforcement learning approach, which takes into account the learning and adaptive nature of market participants. Our model also accounts for all the power systems constraints via a DC-OPF problem. We demonstrate the working of the model and compute various economic impact indicators such as supply shares, cost pass-through, social welfare, profits, allowance prices, and electricity prices. Results from a 9-bus power network are presented.

  17. Learning from the blackouts. Transmission system security in competitive electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    none

    2005-07-01

    Electricity market reform has fundamentally changed the environment for maintaining reliable and secure power supplies. Growing inter-regional trade has placed new demands on transmission systems, creating a more integrated and dynamic network environment with new real-time challenges for reliable and secure transmission system operation. Despite these fundamental changes, system operating rules and practices remain largely unchanged. The major blackouts of 2003 and 2004 raised searching questions about the appropriateness of these arrangements. Management of system security needs to be transformed to maintain reliable electricity services in this more dynamic operating environment. These challenges raise fundamental issues for policymakers. This publication presents case studies drawn from recent large-scale blackouts in Europe, North America, and Australia. It concludes that a comprehensive, integrated policy response is required to avoid preventable large-scale blackouts in the future.

  18. Voltage control in the future power transmission systems

    DEFF Research Database (Denmark)

    Qin, Nan

    Wind energy in Denmark covers 42% of the total power consumption in 2015, and will share up to 50% by 2020. Consequently, the conventional power plants are decommissioning. Under the progress of the green transition, the national decision leads to underground many overhead lines in the future...... stages. The voltage uncertainty caused by the wind power forecasting errors is estimated, which is applied as a voltage security margin to further constrain the voltage magnitude in the optimization problem. The problem under the uncertainty is therefore converted to a deterministic problem, which...... to ensure a highly reliable transmission, e.g. balancing the generation and the consumption in large geographic regions, the exchange capacities will be enlarged by upgrading the interconnections. The Danish power system, the electricity transportation hub between the Nordic and continental European systems...

  19. Simulation of power plant construction in competitive Korean electricity market

    International Nuclear Information System (INIS)

    Ahn, Nam Sung; Huh, Sung Chul

    2001-01-01

    This paper describes the forecast of power plant construction in competitive Korean electricity market. In Korea, KEPCO (Korean Electric Power Corporation, fully controlled by government) was responsible for from the production of the electricity to the sale of electricity to customer. However, the generation part is separated from KEPCO and six generation companies were established for whole sale competition from April 1st, 2001. The generation companies consist of five fossil power companies and one nuclear power company. Fossil power companies are schedule to be sold to private companies including foreign investors. Nuclear power company is owned by government. The competition in generation market will start from 2003. ISO (Independence System Operator) will purchase the electricity from the power exchange market. The market price is determined by the SMP (System Marginal Price) which is decided by the balance between demand and supply of electricity in power exchange market. Under this uncertain circumstance, the energy policy planners are interested to the construction of the power plant in the future. These interests are accelerated due to the recent shortage of electricity supply in California. In the competitive market, investors are no longer interested in the investment for the capital intensive, long lead time generating technologies. Large nuclear and coal plants were no longer the top choices. Instead, investors in the competitive market are interested in smaller, more efficient, cheaper, cleaner technologies such as CCGT (Combined Cycle Gas Turbine). Electricity is treated as commodity in the competitive market. The investor's behavior in the commodity market shows that the new investment decision is made when the market price exceeds the sum of capital cost and variable cost of the new facility and the existing facility utilization depends on the marginal cost of the facility. This investor's behavior can be applied to the new investments for the

  20. The enforcement order for the law for arrangement of surrounding areas of power generating facilities

    International Nuclear Information System (INIS)

    1979-01-01

    The order is defined under the law for arrangement of surrounding areas of power generating facilities. Establishers of power generating facilities shall be hereunder general electric enterprisers, wholesale electric enterprisers and the Power Reactor and Nuclear Fuel Development Corporation. The scale of power generating facilities provided by the order is 350,000 kilo-watts for atomic and steam power generation and 5,000 kilo-watts for hydroelectric power. Equipment closely related to atomic power generation shall include facilities for reprocessing and examination of nuclear fuel materials spent for power generating reactors, reactors used for research of the safety of power generating reactors, experimental fast breeding reactors and experimental uranium enrichment facilities. Requisites for the extent of industrial accumulation are that the area belongs to those self-governing bodies whose industrial accumulation is more than the 8th degree. Public facilities specified are those for communication, sports or recreation, environmental hygiene, education and culture, medicine, social welfare, fire fighting and heat supplying, etc. Governors of the prefectures shall file arrangement programs to the Minister in charge through the Minister of International Trade and Industry to get the permission stipulated by the law. Subsidies shall not be paid to those enterprises which are executed by the government or a part of the expenses is born or supported by it. (Okada, K.)

  1. Advanced exergoenvironmental assessment of a natural gas-fired electricity generating facility

    International Nuclear Information System (INIS)

    Açıkkalp, Emin; Aras, Haydar; Hepbasli, Arif

    2014-01-01

    Highlights: • Advanced exergoenvironmental analysis was conducted for an electricity generating facility. • Exergy destructions and environmental effects were divided into parts. • Environmental relations between the components were determined. • Environmental improvement strategies of the system were determined. - Abstract: This paper presents conventional and advanced exergoenvironmental analyses of an electricity generation facility located in the Eskisehir Industry Estate Zone, Turkey. This facility consists of gas turbine and steam cycles, which generate electrical power of approximately 37 MW and 18 MW, respectively. Exergy efficiency of the system is 0.402 and exergy destruction rate of the system is 78.242 MW. Unit exergy cost of electrical power generated by the system is 25.66 $/GJ and total exergoeconomic factor of the system is 0.279. Conventional exergy analysis method was applied to the system first. Next, exergy environmental impacts of exergy destruction rate within the facility’s components were divided into four parts generally, as endogenous, exogenous, avoidable and unavoidable environmental impact of exergy destruction rate. Through this analysis, improvement potential of the environmental impacts of the components and the overall system and the environmental relations between the components were then determined. Finally, exergoenvironmental factor was determined as 0.277 and environmental impact of the electricity was 8.472 (Pts/h). The system has 33% development potential for environmental impacts while its components have weak relations because of big endogenous parts of environmental impacts (80%). It may be concluded that advanced exergoenvironmental analysis indicated that priority should be given to the GT and CC, while defining the improvement strategies

  2. Requirements for a Hydrogen Powered All-Electric Manned Helicopter

    Science.gov (United States)

    Datta, Anubhav

    2012-01-01

    The objective of this paper is to set propulsion system targets for an all-electric manned helicopter of ultra-light utility class to achieve performance comparable to combustion engines. The approach is to begin with a current two-seat helicopter (Robinson R 22 Beta II-like), design an all-electric power plant as replacement for its existing piston engine, and study performance of the new all-electric aircraft. The new power plant consists of high-pressure Proton Exchange Membrane fuel cells, hydrogen stored in 700 bar type-4 tanks, lithium-ion batteries, and an AC synchronous permanent magnet motor. The aircraft and the transmission are assumed to remain the same. The paper surveys the state of the art in each of these areas, synthesizes a power plant using best available technologies in each, examines the performance achievable by such a power plant, identifies key barriers, and sets future technology targets to achieve performance at par with current internal combustion engines.

  3. Integrated Electrical and Thermal Grid Facility - Testing of Future Microgrid Technologies

    Directory of Open Access Journals (Sweden)

    Sundar Raj Thangavelu

    2015-09-01

    Full Text Available This paper describes the Experimental Power Grid Centre (EPGC microgrid test facility, which was developed to enable research, development and testing for a wide range of distributed generation and microgrid technologies. The EPGC microgrid facility comprises a integrated electrical and thermal grid with a flexible and configurable architecture, and includes various distributed energy resources and emulators, such as generators, renewable, energy storage technologies and programmable load banks. The integrated thermal grid provides an opportunity to harness waste heat produced by the generators for combined heat, power and cooling applications, and support research in optimization of combined electrical-thermal systems. Several case studies are presented to demonstrate the testing of different control and operation strategies for storage systems in grid-connected and islanded microgrids. One of the case studies also demonstrates an integrated thermal grid to convert waste heat to useful energy, which thus far resulted in a higher combined energy efficiency. Experiment results confirm that the facility enables testing and evaluation of grid technologies and practical problems that may not be apparent in a computer simulated environment.

  4. Empirical assessment of market power in the Alberta wholesale electricity market

    International Nuclear Information System (INIS)

    Qu, F.

    2007-01-01

    In the 1990s, many countries began to unbundle regulated electricity monopolies into generation, transmission, distribution and retail companies. Transmission and distribution services remained regulated, but generation and retail services were open for competition. Wholesale and retail electricity markets were created. This paper presented a newly developed competitiveness index specifically for the Alberta market through a simple and standard economic approach. The Alberta Electric Utilities Act came into effect in January 1996. This paper described how the Alberta wholesale electricity market works and demonstrated how to model market power in the electricity market. In this study, power generating companies in Alberta were divided into 2 groups. The first group contained the 5 largest firms called strategic firms, while the other group contained the small generating companies called non-strategic firms or the competitive fringe. In the sample years 2003 and 2004, strategic firms withheld capacity when price was above marginal cost and behaved within the range of competitive pricing. They were more likely to price competitively than to use unilateral market power prices. In addition, firms had higher price-cost margins during the off-peak season. This paper explained in detail the reason for this unusual off-peak pattern. The index to measure a firm's strategic behaviour in the Alberta electricity market was developed according to price-cost margin data where firm-behaviour effect was distinguished from the demand-elasticity effect. It was concluded that policy-makers and regulations should consider the magnitude and source of market power when designing market structure, rules and trading practices. 9 refs., 5 tabs., 2 figs

  5. A study of electrical power network of renewable energies and water desalination research center using power quality phenomena and indices

    International Nuclear Information System (INIS)

    Segayer, Ali Mehemmed

    2008-08-01

    Renewable energies and water distillation research center (REWDRC) is a very strategic research facility and contains many important and critical industrial and electrical loads that must to be operated as a group to fulfill the requirements and the needs of the center in the operation of the main research facility of the center which a 10 MW reactor. Faults on the electrical or the industrial system can occur on many ways such as a malfunction in the questioned system, power quality related problem, or a failure of any of the loads (such as central ventilation or water circulation system or one of the substations) have a great diverse effect on the operation of the main research facility (reactor). In this research common problems due to power quality phenomena were studied, assessed through a assigning some power quality indices to the electrical network of the center so that the operational condition of the REWDRC electrical and industrial network could be evaluated. power quality indices (PQI) were assigned based on results of real time measurements at the points of common coupling of the network (PCC) and the initial power quality survey report. indices analysis was done using three methods which were the normalization method, method of comparing to the limit value and analysis of measurement data time function profile. As a result of this research a recommendation for safe operation against power quality disturbances was pointed out through a continuous monitoring of assigned power quality indices. (Author)

  6. The benefits of transmission expansions in the competitive electricity markets

    International Nuclear Information System (INIS)

    Bresesti, Paola; Calisti, Roberto; Cazzol, Maria Vittoria; Gatti, Antonio; Vaiani, Andrea; Vailati, Riccardo; Provenzano, Dario

    2009-01-01

    The paper presents an innovative method for assessing simultaneously technical and economic benefits of transmission expansions. This method takes into account the new needs of the transmission planning process for competitive electricity markets, in which benefits of major transmission expansions include: (a) improved reliability, (b) increased availability of efficient supply and (c) increased competition among suppliers. The fundamental elements of the REliability and MARKet (REMARK) tool, which we implemented based on the aforementioned method, are: a yearly probabilistic simulation of power system operation; use of the non-sequential Monte Carlo method to pick the operational status of the network elements; full network representation; adoption of the simplified direct current model; quantitative assessment of the reliability benefits through the expected energy not supplied index; simulation of the strategic behaviour of suppliers based on a simplified model that correlates the price-cost mark-up to structural market variables (residual supply index and demand); a quantitative assessment of ''economic'' benefits through the calculation of the social welfare index. A test case application of the tool on the IEEE 24-bus reliability test system shows that the method can assess benefits of transmission expansions, in addition to the overall social perspective, for each market zone as well as separately for consumers, producers and transmission system operators. The results emphasize that the effect of transmission expansions in mitigating market power may be significant and that a simple and traditional cost-based approach may lead to a wrong evaluation of benefits given by transmission expansions. (author)

  7. The design, construction, and operation of long-distance high-voltage electricity transmission technologies.

    Energy Technology Data Exchange (ETDEWEB)

    Molburg, J. C.; Kavicky, J. A.; Picel, K. C.

    2008-03-03

    This report focuses on transmission lines, which operate at voltages of 115 kV and higher. Currently, the highest voltage lines comprising the North American power grid are at 765 kV. The grid is the network of transmission lines that interconnect most large power plants on the North American continent. One transmission line at this high voltage was built near Chicago as part of the interconnection for three large nuclear power plants southwest of the city. Lines at this voltage also serve markets in New York and New England, also very high demand regions. The large power transfers along the West Coast are generally at 230 or 500 kV. Just as there are practical limits to centralization of power production, there are practical limits to increasing line voltage. As voltage increases, the height of the supporting towers, the size of the insulators, the distance between conductors on a tower, and even the width of the right-of-way (ROW) required increase. These design features safely isolate the electric power, which has an increasing tendency to arc to ground as the voltage (or electrical potential) increases. In addition, very high voltages (345 kV and above) are subject to corona losses. These losses are a result of ionization of the atmosphere, and can amount to several megawatts of wasted power. Furthermore, they are a local nuisance to radio transmission and can produce a noticeable hum. Centralized power production has advantages of economies of scale and special resource availability (for instance, hydro resources), but centralized power requires long-distance transfers of power both to reach customers and to provide interconnections for reliability. Long distances are most economically served at high voltages, which require large-scale equipment and impose a substantial footprint on the corridors through which power passes. The most visible components of the transmission system are the conductors that provide paths for the power and the towers that keep these

  8. Electric power and the environment: An analysis of pollutant emissions at Argentine state-owned electric power stations

    Energy Technology Data Exchange (ETDEWEB)

    Carnevali, D; Suarez, C E [Instituto de Economia Energetica, San Carlos de Bariloche (Argentina)

    1991-08-01

    This paper describes the impact on particulate and 'greenhouse gases' emissions of substitution policies implemented by Argentine state-owned electric power stations. Those policies involve the substitution, on the one hand, of hydroelectric and nuclear energy for conventional thermal energy and, on the other hand, of natural gas for fuel oil, diesel oil and coal. As additional investments are required in conventional thermal power stations to prevent environmental pollution, the investment savings generated by substitution policies have been calculated. While the environmental impacts of hydroelectric, nuclear and natural gas facilities is locally significant and is experienced in geographical areas away from cities, there can be no doubt that the substitution policies implemented in the Argentine electricity sector have overall both ecological and economic benefits. (author). 1 ref., 8 figs, 2 tabs.

  9. A future role for cascade hydropower in the electricity system of China

    International Nuclear Information System (INIS)

    Tang, Xinhua; Zhou, Jianjun

    2012-01-01

    Due to the dominance of coal power, the electricity sector is the primary contributor of greenhouse gas emissions in China. The increase of peak-load and intermittent renewable power requires significant resources of regulation facilities. Comprehensively utilizing large-scale cascade hydropower plants (CHPPs), which are being rapidly developed in China, as renewable regulating facilities would be a strategic decision, considering the flexibility of hydropower. Jointly modeling a set of CHPP in the upstream Yangtze River indicated that the CHPP can regulate peak-load up to 30–40 GW and intermittent renewables to scales of nearly 15 GW from wind and solar sources with the help of ±800 KV ultra-high voltage direct current (UHVDC) transmissions. The present study shows that the hydraulic stability of the concerned river reaches can be preserved easily and the comprehensive efficiency of regulation and transmission by CHPPs is much higher than that of pumped hydro energy storage (PHES) stations. As increasingly more giant CHPPs emerge in west China, using them primarily as regulating facilities can enhance the structure of power grids, promote the development of renewables, save energy and reduce emissions. Thus we propose to shift the CHPPs that were originally projected mainly for electricity to facility primarily for power improvement. - Highlights: ► Large cascade hydropower plant (CHPP) is efficient and renewable peaking facility (PF). ► CHPPs can easily anti-regulate the hydro-fluctuations caused by power regulations. ► Remote CHPPs with UHVDC transmission can massively replace the traditional PFs.► Shift China's CHPPs mainly as PF to promote intermittent renewables are proposed.

  10. 3 tons pure electric vehicles power system design based on Cruise

    Directory of Open Access Journals (Sweden)

    Xinyu Liu

    2017-01-01

    Full Text Available The pure electric minivan is different from electric car. Combined with a given vehicle, vehicle simulation model established in Cruise software, complete simulation by setting tasks for the selected models designed drivetrain. Simulation results show that: The design of the transmission ratio can best meet the performance requirements of the matching target power analysis and simulation of electric minivan provides a new way, with practical guidance.

  11. Space Solar Power Technology Demonstration for Lunar Polar Applications: Laser-Photovoltaic Wireless Power Transmission

    Science.gov (United States)

    Henley, M. W.; Fikes, J. C.; Howell, J.; Mankins, J. C.; Howell, Joe T. (Technical Monitor)

    2002-01-01

    Space Solar Power technology offers unique benefits for near-term NASA space science missions, which can mature this technology for other future applications. "Laser-Photo-Voltaic Wireless Power Transmission" (Laser-PV WPT) is a technology that uses a laser to beam power to a photovoltaic receiver, which converts the laser's light into electricity. Future Laser-PV WPT systems may beam power from Earth to satellites or large Space Solar Power satellites may beam power to Earth, perhaps supplementing terrestrial solar photo-voltaic receivers. In a near-term scientific mission to the moon, Laser-PV WPT can enable robotic operations in permanently shadowed lunar polar craters, which may contain ice. Ground-based technology demonstrations are proceeding, to mature the technology for this initial application, in the moon's polar regions.

  12. Outline of construction and facility features of Onagawa nuclear power station Unit No. 2

    International Nuclear Information System (INIS)

    Umimura, Yoshiharu; Tsunoda, Ryohei; Watanabe, Kazunori

    1996-01-01

    Tohoku Electric Power Company promotes development of various power sources to provide a stable supply of electricity in the future, and nuclear power takes a leading part. In August 1989, construction of Onagawa nuclear power plant Unit No. 2 (825MW) was started, following Unit No. 1 (524MW) which went on line in 1984 as Tohoku Electric's first nuclear power plant unit. Unit No. 2 began commercial operation in July 1995 through satisfactory construction work such as RPV hydraulic test in March 1994, fuel loading in October 1994, and various startup tests in each power stage. The design and construction of Unit No. 2 reflect construction and operation experience gained from Unit No. 1, and the latest technology, including that of the LWR Improvement and Standardization Program, was adopted to enhance facility reliability, improve operation and maintenance performance, and reduce worker dosage. Features of the facility, construction techniques, and a description of preoperation of Onagawa nuclear power plant Unit No. 2 are described in this paper. (author)

  13. 76 FR 10353 - Locational Exchanges of Wholesale Electric Power

    Science.gov (United States)

    2011-02-24

    ... marketer instead of El Paso's merchant affiliate.\\12\\ \\11\\ El Paso Electric Co., 115 FERC ] 61,312 (2006... characteristics of locational exchanges and whether the definition set forth by Puget's Petition sufficiently... transmission between the exchange points; and (5) allow entities such as power marketers the ability to avoid...

  14. A modular Space Station/Base electrical power system - Requirements and design study.

    Science.gov (United States)

    Eliason, J. T.; Adkisson, W. B.

    1972-01-01

    The requirements and procedures necessary for definition and specification of an electrical power system (EPS) for the future space station are discussed herein. The considered space station EPS consists of a replaceable main power module with self-contained auxiliary power, guidance, control, and communication subsystems. This independent power source may 'plug into' a space station module which has its own electrical distribution, control, power conditioning, and auxiliary power subsystems. Integration problems are discussed, and a transmission system selected with local floor-by-floor power conditioning and distribution in the station module. This technique eliminates the need for an immediate long range decision on the ultimate space base power sources by providing capability for almost any currently considered option.

  15. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  16. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    International Nuclear Information System (INIS)

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park

  17. Proceedings of the North American Transmission and Distribution Conference and Expo. CD ed.

    International Nuclear Information System (INIS)

    2005-01-01

    This conference provided power suppliers with technology information regarding the transmission and distribution marketplace. It profiled industry solutions, information and education regarding the latest products and technologies to help utility professionals in their design, specifications, planning and reliability efforts. More than 1200 decision makers, suppliers and utility professionals attended the conference, including electrical utility chief executive officers, presidents, operations managers, billing experts, customer care facility managers, system planners, transmission/distribution managers, asset management, system operations management, and engineering consultants. Vendors also demonstrated the latest equipment, software and technology for the transmission and distribution market. Transmission was the focal point of core business activities with emphasis on energy management, new technologies, operations, maintenance, and planning and design. Topics of discussion ranged from load response strategies, metering systems, modernization of large industrial plants for interconnection with utilities, streetlight management systems, improvements to circuit utilization, energy fraud detection, power surge protection, de-icing systems, cyber security, and the Canadian electricity workforce. tabs., figs

  18. High-voltage direct current (HVDC) transmission - a key technology for our power supply

    International Nuclear Information System (INIS)

    Dorn, J.

    2016-01-01

    The phasing-out of nuclear power in some countries and the aspirations of reducing carbon dioxide emissions have far-reaching implications for electric power generation in Europe. In the future, renewable electricity generation will account for a considerable share of the energy mix, but this type of production is often far from the load centers. In Germany, for example, large quantities of wind energy are already generated in the north and in the North Sea, but large load centers are located several hundred kilometers south of there. This requires an expansion of the transmission network with innovative solutions. High-voltage direct-current (HVDC) transmission plays an important role, since it brings a number of advantages over conventional AC technology and makes certain requirements feasible, for example Cable transmission over longer distances. The lecture presents the advantages of HVDC, the semiconductors used as well as the basic functions and typical performance of the used converter topopologies. The plant configurations and main components are illustrated using current projects. (rössner) [de

  19. The electric power engineering handbook electric power transformer engineering

    CERN Document Server

    Harlow, James H

    2012-01-01

    Electric Power Transformer Engineering, Third Edition expounds the latest information and developments to engineers who are familiar with basic principles and applications, perhaps including a hands-on working knowledge of power transformers. Targeting all from the merely curious to seasoned professionals and acknowledged experts, its content is structured to enable readers to easily access essential material in order to appreciate the many facets of an electric power transformer.Topically structured in three parts, the book: * Illustrates for electrical engineers the relevant theories and pri

  20. Legislation development of the Spanish electric power act vol 4

    International Nuclear Information System (INIS)

    2002-01-01

    Of this Book: 1) Royal decree 277/2000, dated february 25th setting out the procedure for legal unbundling of the activities involved in the supply of electricity. 2) Royal decree 1663/2000, dated september 29th on the connection of photovoltaic installations to the low voltage network. 3) Royal decree 1955/2000, dated december 1st regulating transmission, distribution, and authorization procedures for electric power installations. 4) Royal decree 3490/2000, Dated december 29th setting the electricity tariff for 2001

  1. Transmission Integration | Grid Modernization | NREL

    Science.gov (United States)

    Transmission Integration Transmission Integration The goal of NREL's transmission integration integration issues and provide data, analysis, and models to enable the electric power system to more and finding solutions to address them to enable transmission grid integration. Capabilities Power

  2. A modular neural network scheme applied to fault diagnosis in electric power systems.

    Science.gov (United States)

    Flores, Agustín; Quiles, Eduardo; García, Emilio; Morant, Francisco; Correcher, Antonio

    2014-01-01

    This work proposes a new method for fault diagnosis in electric power systems based on neural modules. With this method the diagnosis is performed by assigning a neural module for each type of component comprising the electric power system, whether it is a transmission line, bus or transformer. The neural modules for buses and transformers comprise two diagnostic levels which take into consideration the logic states of switches and relays, both internal and back-up, with the exception of the neural module for transmission lines which also has a third diagnostic level which takes into account the oscillograms of fault voltages and currents as well as the frequency spectrums of these oscillograms, in order to verify if the transmission line had in fact been subjected to a fault. One important advantage of the diagnostic system proposed is that its implementation does not require the use of a network configurator for the system; it does not depend on the size of the power network nor does it require retraining of the neural modules if the power network increases in size, making its application possible to only one component, a specific area, or the whole context of the power system.

  3. Impacts of Western Area Power Administration's power marketing alternatives on electric utility systems

    International Nuclear Information System (INIS)

    Veselka, T.D.; Portante, E.C.; Koritarov, V.

    1995-03-01

    This technical memorandum estimates the effects of alternative contractual commitments that may be initiated by the Western Area Power Administration's Salt Lake City Area Office. It also studies hydropower operational restrictions at the Salt Lake City Area Integrated Projects in combination with these alternatives. Power marketing and hydropower operational effects are estimated in support of Western's Electric Power Marketing Environmental Impact Statement (EIS). Electricity production and capacity expansion for utility systems that will be directly affected by alternatives specified in the EIS are simulated. Cost estimates are presented by utility type and for various activities such as capacity expansion, generation, long-term firm purchases and sales, fixed operation and maintenance expenses, and spot market activities. Operational changes at hydropower facilities are also investigated

  4. Efficiency and environmental factors in the US electricity transmission industry

    International Nuclear Information System (INIS)

    Llorca, Manuel; Orea, Luis; Pollitt, Michael G.

    2016-01-01

    The electricity industry in most developed countries has been restructured over recent decades with the aim of improving both service quality and firm performance. Regulated segments (e.g. transmission) still provide the infrastructure for the competitive segments and represent a significant share of the total price paid by final customers. However there is a lack of empirical studies that analyse firms' performance in the electricity transmission sector. In this paper an empirical analysis of US electricity transmission companies is conducted for the period 2001–2009. We use alternative stochastic frontier models that allow us to identify the determinants of firms' inefficiency. These models also permit us to control for weather conditions, potentially one of the most decisive uncontrollable factors in electricity transmission. Our results suggest that weather conditions clearly have an influence on transmission costs and that there is room for improvement in the management of US electricity transmission systems. Regulators should also be aware that more adverse conditions generate higher levels of inefficiency, and that achieving long-term efficiency improvements tends to worsen firms' short-term relative performance. - Highlights: • We analyse firms' performance in the US electricity transmission industry. • Alternative SFA models are estimated to identify determinants of firms' efficiency. • Our results indicate that firms' efficiency has declined and diverged over time. • We find that more adverse conditions generate higher levels of inefficiency.

  5. Third generation hybrid drive. Transmission-based integration of power electronics; Dritte Generation Hybridantrieb. Getriebenahe Integration der Leistungselektronik

    Energy Technology Data Exchange (ETDEWEB)

    Schoen, Wolfgang [ZF Friedrichshafen AG, Friedrichshafen (DE). Hybridantriebe (F und E); Lutz, Steffen [BMW AG, Muenchen (Germany); Hensler, Alexander [Technische Univ. Chemnitz (Germany); Munding, Andreas [Liebherr Elektronik GmbH, Lindau (Germany); Thoben, Markus [Infineon Technologies AG, Warstein (Germany); Zeidler, Dietmar [Kemet Electronics GmbH, Landsberg am Lech (Germany)

    2011-06-15

    The power electronics components in today's hybrid vehicles are situated at different places in the vehicle - till now far away from harsh and hot surroundings. In order to develop an integrated solution near the transmission, ZF and BMW launched the research project 'Electric components for active power transmissions' (EfA). On the basis of an eight-speed full hybrid transmission and together with Infineon, Kemet, Liebherr, and the University of Technology of Chemnitz, they are developing a power electronics unit, which facilitates doubling the power density while increasing the operating temperature. The project EfA will be concluded in June 2011. (orig.)

  6. Proceedings of the Canadian Institute's BC power conference : maximizing opportunities in the evolving electricity sector

    International Nuclear Information System (INIS)

    2004-01-01

    This conference provided a forum for reviewing recent events and activities in British Columbia's electric power industry. Issues regarding energy supply, reliability, power generation, power distribution and power transmission were discussed along with the opportunities and challenges of developing renewable energy sources. Participants at the conference gained insight into strategies for determining the usefulness of an energy plan; assessing the prospects for new generation capacity; examining future whole sale markets; analyzing congestion problems; identifying import and export opportunities; planning for rate design and exploring the future supply on Vancouver Island. The possibilities for meeting the growing demand for electricity through an integrated electrical transmission system throughout the west coast, British Columbia, the Pacific Northwest and Alberta were examined along with financing structures and strategies of renewable energy projects. The role of regulators and their influence on electricity prices were also discussed. Resource planning guidelines were examined as well as other topics such as demand side management, energy conservation, the role of liquefied natural gas in power generation, and land use challenges for power generation. The conference featured 21 presentations, of which 7 have been catalogued separately for inclusion in this database. tabs, figs

  7. Inter-regional transmission and power trading opportunities : making operating agreements work

    International Nuclear Information System (INIS)

    DesRosiers, D.

    2001-01-01

    International electric power transmission issues were the focus of this power point presentation which included a corporate profile of the Detroit Edison and International Transmission Company (ITC) and an overview of the midwest U.S. market and the Michigan-Ontario interconnections. ITC owns the transmission assets of its parent company Detroit Edison. It has a commitment with the Federal Energy Regulatory Commission (FERC) to be independent of all market participants within 18 months. ITC's peak load is 11,000 MW with 3 interconnections with Hydro One in Ontario, Consumers Energy in Michigan and First Energy in Ohio. The Ontario-Michigan interface includes four tie lines, 3 near Sarnia and 1 near Windsor, with a total capacity of 1,400 MW into Ontario and 2,000 MW out of Ontario. However, the amount of commercially available power is significantly inhibited by a phenomenon called loopflow, which is the difference between the scheduled and actual power flow. The problems and solutions to loopflow were also outlined. This presentation also briefly discussed the agreement reached between the Alliance RTO and the Midwest ISO that will allow the two to co-exist in the Midwest. tabs., figs

  8. Minutes of the Meeting - Pennsylvania Electric Association, Engineering Section, Transmission and Distribution Committee, Spring, 1981

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    Proceedings includes 8 papers dealing with underground and submarine crossings of electric power cables, underground fault locating equipment, lightning arresters, the current carrying capacity of conductors in distribution systems, emergency warning facilities in nuclear power plants, and the use of fiberglass/polyester materials in fiberglass poles

  9. Calculation of electrical and magnetic field in electric power transmission lines aiming project optimization, environmental impact and alternatives comparisons; O calculo dos campos eletrico e magnetico de L.T. visando a otimizacao do projeto, o impacto ambiental e a comparacao de alternativas

    Energy Technology Data Exchange (ETDEWEB)

    Portela, Carlos M. [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE); Moreno O, German [Antioquia Univ., Medellin (Colombia). Dept. de Engenharia Eletrica

    1995-12-31

    The optimization of overhead electric power transmission lines leads to compact projects in which the neighbourhood electric and magnetic field are a critical restriction. The Load Simulation Method enables the reliable calculation of such fields. Presented are equations for the application of such conditions. Results are presented 9 figs., 2 tabs., 10 refs.

  10. Major power system failures (Europe, USA) and deregulation of electricity markets

    International Nuclear Information System (INIS)

    Merlin, A.

    2004-01-01

    The year 2003 was marked by several electric power blackouts which affected major power systems in the world, and gave rise to many opinions about possible links with developments brought by the opening of the electricity markets. At first the paper presents the outages experienced by North America or August 14 and by Switzerland and Italy on September 28, 2003. Feedback on previous electric power blackouts makes possible to find out already known lessons, then to bring out how the latest blackouts may reveal similarities or differences towards developments brought by the opening of the electricity markets occurred ire the last ten years. Finally, seen from the transmission system operator of a european country within the context of continued institutional developments, the paper points out significant items which must be considered to prevent possible further blackouts. (author)

  11. STG-ET: DLR electric propulsion test facility

    Directory of Open Access Journals (Sweden)

    Andreas Neumann

    2017-04-01

    Full Text Available DLR operates the High Vacuum Plume Test Facility Göttingen – Electric Thrusters (STG-ET. This electric propulsion test facility has now accumulated several years of EP-thruster testing experience. Special features tailored to electric space propulsion testing like a large vacuum chamber mounted on a low vibration foundation, a beam dump target with low sputtering, and a performant pumping system characterize this facility. The vacuum chamber is 12.2m long and has a diameter of 5m. With respect to accurate thruster testing, the design focus is on accurate thrust measurement, plume diagnostics, and plume interaction with spacecraft components. Electric propulsion thrusters have to run for thousands of hours, and with this the facility is prepared for long-term experiments. This paper gives an overview of the facility, and shows some details of the vacuum chamber, pumping system, diagnostics, and experiences with these components.

  12. The development of a subsea power transmission system for deep water boosting applications

    Energy Technology Data Exchange (ETDEWEB)

    Godinho, C.A.F. [Pirelli Cabos S.A. (Brazil); Campagnac, L.A. [Siemens S.A. (Brazil); Nicholson, A. [Tronic Electronics Services Ltd. (WEC); Magalhaes, W.M. de [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    1996-12-31

    This paper presents the development of a sub sea power transmission in medium voltage and variable frequency, as a key system for application of Boosting technology and for electrical submersible Pumping in deep water wells. This work focuses on the design and manufacture of sub sea power cables and transformers for 1,000 m water depth. 8 refs., 6 figs.

  13. Wireless Sensor Network for Electric Transmission Line Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Alphenaar, Bruce

    2009-06-30

    . On such a platform, it has been demonstrated in this project that wireless monitoring units can effectively deliver real-time transmission line power flow information for less than $500 per monitor. The data delivered by such a monitor has during the course of the project been integrated with a national grid situational awareness visualization platform developed by Oak Ridge National Laboratory. Novel vibration energy scavenging methods based on piezoelectric cantilevers were also developed as a proposed method to power such monitors, with a goal of further cost reduction and large-scale deployment. Scavenging methods developed during the project resulted in 50% greater power output than conventional cantilever-based vibrational energy scavenging devices typically used to power smart sensor nodes. Lastly, enhanced and new methods for electromagnetic field sensing using multi-axis magnetometers and infrared reflectometry were investigated for potential monitoring applications in situations with a high density of power lines or high levels of background 60 Hz noise in order to isolate power lines of interest from other power lines in close proximity. The goal of this project was to investigate and demonstrate the feasibility of using small form factor, highly optimized, low cost, low power, non-contact, wireless electric transmission line monitors for delivery of real-time, independent power line monitoring for the US power grid. The project was divided into three main types of activity as follows; (1) Research into expanding the range of applications for non-contact power line monitoring to enable large scale low cost sensor network deployments (Tasks 1, 2); (2) Optimization of individual sensor hardware components to reduce size, cost and power consumption and testing in a pilot field study (Tasks 3,5); and (3) Demonstration of the feasibility of using the data from the network of power line monitors via a range of custom developed alerting and data visualization

  14. Evaluation of all-electric secondary power for transport aircraft

    Science.gov (United States)

    Murray, W. E.; Feiner, L. J.; Flores, R. R.

    1992-01-01

    This report covers a study by Douglas Aircraft Company (DAC) of electrical power systems for advanced transport aircraft based upon an all-electric design concept. The concept would eliminate distributed hydraulic and pneumatic secondary power systems, and feature an expanded secondary electrical power system redesigned to supply power to the loads customarily supplied by hydraulic or pneumatic power. The initial study was based on an advanced 20-kHz electrical power transmission and distribution system, using a system architecture supplied by NASA-Lewis Research Center for twin-engine aircraft with many advanced power conversion concepts. NASA-LeRC later requested DAC to refocus the study on 400-Hz secondary power distribution. Subsequent work was based on a three-engine MD-11 aircraft, selected by DAC as a baseline system design that would provide data for the comparative cost/benefit analysis. The study concluded that the 20-kHz concept produced many expected benefits, and that the all-electric trijet weight savings on hardware redesign would be 2,304 pounds plus a 2.1-percent fuel reduction and resized for a total weight reduction of 11,000 pounds. Cost reductions for a fleet of 800 aircraft in a 15-year production program were estimated at $76.71 million for RDT&E; $2.74 million per aircrat for production; $9.84 million for nonrecurring expenses; $120,000 per aircraft for product support; and $300,000 per aircraft per year for operating and maintenance costs, giving a present value of $1.914 billion saved or a future value of $10.496 billion saved.

  15. Proceedings of the 13. SNPTEE: Brazilian seminar on electric power production and transmission. Group 1: Hydraulic production (GPH); Anais do 13. SNPTEE: Seminario nacional de producao e transmissao de energia eletrica. Grupo 1: Producao hidraulica (GPH)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    This book collects the works presented during the 12. national seminar on electric power generation and transmission. The group I papers collects works concerning hydroelectric power generation, the most common form of electric power generation Brazil due to the country`s natural resources which are favourable to this type of generation. Several case studies are presented as well as the new trends for this generation form in Brazil

  16. Design of Electricity Markets for Efficient Balancing of Wind Power Generation

    OpenAIRE

    Scharff, Richard

    2015-01-01

    Deploying wind power to a larger extent is one solution to reduce negative environmental impacts of electric power supply. However, various challenges are connected with increasing wind power penetration levels. From the perspective of transmission system operators, this includes balancing of varying as well as - to some extent - uncertain generation levels. From the perspective of power generating companies, changes in the generation mix will affect the market's merit order and, hence, their...

  17. Electrical and Biological Effects of Transmission Lines: A Review.

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jack M.

    1989-06-01

    This review describes the electrical properties of a-c and d-c transmission lines and the resulting effects on plants, animals, and people. Methods used by BPA to mitigate undesirable effects are also discussed. Although much of the information in this review pertains to high-voltage transmission lines, information on distribution lines and electrical appliances is included. The electrical properties discussed are electric and magnetic fields and corona: first for alternating-current (a-c) lines, then for direct current (d-c).

  18. Utilization of excess wind power in electric vehicles

    International Nuclear Information System (INIS)

    Hennings, Wilfried; Mischinger, Stefan; Linssen, Jochen

    2013-01-01

    This article describes the assessment of future wind power utilization for charging electric vehicles (EVs) in Germany. The potential wind power production in the model years 2020 and 2030 is derived by extrapolating onshore wind power generation and offshore wind speeds measured in 2007 and 2010 to the installed onshore and offshore wind turbine capacities assumed for 2020 and 2030. The energy consumption of an assumed fleet of 1 million EVs in 2020 and 6 million in 2030 is assessed using detailed models of electric vehicles, real world driving cycles and car usage. It is shown that a substantial part of the charging demand of EVs can be met by otherwise unused wind power, depending on the amount of conventional power required for stabilizing the grid. The utilization of wind power is limited by the charging demand of the cars and the bottlenecks in the transmission grid. -- Highlights: •Wind power available for charging depends on minimum required conventional power (must-run). •With 20 GW must-run power, 50% of charging can be met by excess wind power. •Grid bottlenecks decrease charging met by wind power from 50 % to 30 %. •With zero must-run power, only very little wind power is available for charging

  19. Electric traction motion power and energy supply : basics and practical experience

    CERN Document Server

    Steimel, Andreas

    2011-01-01

    This book has evolved from the lecture series ""Elektrische Bahnen" (""Electric railways") which has been held at Ruhr-Universität Bochum since 1996. Its primary audience are students of electrical energy technologies, control engineering and mechanical engineering as well as young engineers of electrical engineering, especially in the fields of power electronics, in railway industry and in railway-operating companies. The book intends to convey mechanical fundamentals of electric railway propulsion, which includes rail-bound guidance, transmission of traction effort from wheel to rail under t

  20. Estimating electricity storage power rating and discharge duration for utility transmission and distribution deferral :a study for the DOE energy storage program.

    Energy Technology Data Exchange (ETDEWEB)

    Eyer, James M. (Distributed Utility Associates, Livermore, CA); Butler, Paul Charles; Iannucci, Joseph J., Jr. (,.Distributed Utility Associates, Livermore, CA)

    2005-11-01

    This report describes a methodology for estimating the power and energy capacities for electricity energy storage systems that can be used to defer costly upgrades to fully overloaded, or nearly overloaded, transmission and distribution (T&D) nodes. This ''sizing'' methodology may be used to estimate the amount of storage needed so that T&D upgrades may be deferred for one year. The same methodology can also be used to estimate the characteristics of storage needed for subsequent years of deferral.

  1. Description of the electric power and energy trade in Finland

    International Nuclear Information System (INIS)

    Komulainen, K.

    1992-01-01

    The Finnish State has traditionally controlled the import of electricity, larger related investments and pricing. Lately, a market orientated economic policy has influenced energy policy and the amount of state control has gradually decreased. Decisions have yet to be made with regard to the fifth nuclear power reactor. The paper deals briefly with the subjects of the electric power, natural gas and oil markets. Finland's transmission network has connections to the former Russia and the Baltic countries. According to agreements within the European Community, Finland must now make changes in its electric power supply structure. Competition will be encouraged and monopolies discouraged. Pricing shall be transparent, and power plants must present written documentation for their management system, price regulations etc. A law must be passed to legitimate trade across the country's borders. Emphasis will be laid on energy conservation and energy research and consultant services. It is claimed that Finland's level of technology in this area lives up to international standards. (AB)

  2. SAInt – A novel quasi-dynamic model for assessing security of supply in coupled gas and electricity transmission networks

    NARCIS (Netherlands)

    Pambour, Kwabena Addo; Cakir Erdener, Burcin; Bolado-Lavin, Ricardo; Dijkema, Gerhard P.J.

    2017-01-01

    The integration of renewable energy sources into existing electric power systems is connected with an increased interdependence between natural gas and electricity transmission networks. To analyse this interdependence and its impact on security of supply, we developed a novel quasi-dynamic

  3. Coordination Between Wind Power, Hydro Storage Facility and Conventional Generating Units According to the Annual Growth Load

    Directory of Open Access Journals (Sweden)

    Shahrokh Shojaeean

    2013-04-01

    Full Text Available Considering the growing trend of the consumption of the electric power and the global tendency to substitute new renewable sources of energy, this paper proposes a Monte Carlo based method to determine an optimal level of this change. Considering the limitation of the wind farms in continuous supply of electric power, hydrostatic power storage facilities are used beside wind farms so that the electric power could be stored and fed in a continuous flow into power systems. Due to the gradual exclusion of conventional generators and 5 percent annual load increments, LOLE index was used in order to calculate the amount of the wind power and the capacity of the necessary power storage facility. To this end, LOLE index was calculated for the first year as the reference index for the estimation of the amount of wind power and the capacity of the storage facility in consequent years. For the upcoming years, calculations have been made to account for the gradual exclusion of conventional generators in proportion to load increments. The proposed method has been implemented and simulated on IEEE-RTS test system.

  4. One-dimensional pressure transfer models for acoustic-electric transmission channels

    Science.gov (United States)

    Wilt, K. R.; Lawry, T. J.; Scarton, H. A.; Saulnier, G. J.

    2015-09-01

    A method for modeling piezoelectric-based ultrasonic acoustic-electric power and data transmission channels is presented. These channels employ piezoelectric disk transducers to convey signals across a series of physical layers using ultrasonic waves. This model decomposes the mechanical pathway of the signal into individual ultrasonic propagation layers which are generally independent of the layer's adjacent domains. Each layer is represented by a two-by-two traveling pressure wave transfer matrix which relates the forward and reverse pressure waves on one side of the layer to the pressure waves on the opposite face, where each face is assumed to be in contact with a domain of arbitrary reference acoustic impedance. A rigorous implementation of ultrasonic beam spreading is introduced and implemented within applicable domains. Compatible pressure-wave models for piezoelectric transducers are given, which relate the electric voltage and current interface of the transducer to the pressure waves on one mechanical interface while also allowing for passive acoustic loading of the secondary mechanical interface. It is also shown that the piezoelectric model's electrical interface is compatible with transmission line parameters (ABCD-parameters), allowing for connection of electronic components and networks. The model is shown to be capable of reproducing the behavior of realistic physical channels.

  5. Smart Power Supply Systems for Mission Critical Facilities

    Science.gov (United States)

    Hirose, Keiichi; Babasaki, Tadatoshi

    To develop the advanced and rich life, and the also economy and social activity continuously, various types of energy are necessary. At the same time, to protect the global environment and to prevent the depletion of natural resources, the effective and moreover efficient use of energy is becoming important. Electric power is one of the most important forms of energy for our life and society. This paper describes topics and survey results of technical trends regarding the electric power supply systems which are playing a core role as the important infrastructure to support the emergence of information-oriented society. Specifically, the power supply systems that enhance high power quality and reliability (PQR) are important for the steady growth of information and communication services. The direct current (DC) power, which has been used for telecommunications power systems and information and communications technologies (ICT), enables existing utilities' grid and distributed energy resources to keep a balance between supply and demand of small-scaled power systems or microgirds. These techniques are expected to be part of smartgrid technologies and facilitate the installation of distributed generators in mission critical facilities.

  6. Competitive electric power markets and grid reliability : something has changed during the past decade

    International Nuclear Information System (INIS)

    Fluckiger, K.

    2005-01-01

    This white paper reviewed some of the fundamental changes in the way in which electricity is provided to customers. Previously, electricity was delivered by integrated electric utilities that owned both generation and transmission and directly served their customers. Restructuring altered the rules that govern control, operation, ownership and regulation of the industry. The traditional integrated utility has been disaggregated. Wholesale electricity costs are no longer regulated and prices are now set by supply and demand in a market context. Generation investment decisions are based on future expectations of market performance. It was suggested that transmission should become a facilitator of the competitive market. Inter-ties are an essential part of a competitive market, as a means to import power when needed and to export surplus energy. The role of transmission in facilitating new generation by providing non-discriminatory and efficient transport to the market was discussed. It was noted that the lack of transmission investment is resulting in economic penalties, rising losses and constraints on more economic generators. Transmission congestion is counterproductive to the interests of customers. A move away from regional planning to a recognition of the wider interconnectedness of the system was recommended. The current practice of deferring necessary maintenance as a way to generate short-term profit was examined. It was noted that despite the need for new transmission infrastructure, investment in merchant alternating current projects has been slow to materialize. Other challenges to transmission included the uncertainty of regulatory processes and investment recovery as well as the unpredictability of flow patterns in the bulk power system. It was concluded that competitive generation markets will not work with an inadequate transmission infrastructure. Transmission enables new generation by ensuring non-discriminatory and efficient transport to market

  7. Reliability risks during the transition to competitive electricity markets

    International Nuclear Information System (INIS)

    Hughes, J.P.

    2005-01-01

    The Electricity Consumers Resource Council (ELCON) is a U.S. association representing industrial consumers of electricity, and is a long-standing advocate of competition in the electric power industry. However, because a reliable grid is necessary to support competitive wholesale markets, ELCON believes that the transmission system is an essential facility that must remain regulated. The initiatives discussed in this white paper represent significant steps that the National Electric Reliability Council (NERC) and the industry have taken to improve reliability in a competitive and restructured electric industry. Strategic manoeuvres of incumbent utilities to maintain market share were evaluated, as well as discrimination against potential competitors. It was suggested that, occasionally, indecisive federal policies have been taken advantage of by utilities. The unintended consequences of state restructuring policies that allow utilities to over-earn their revenue requirements were reviewed. NERC reliability standards will remain unenforceable until a new Electricity Reliability Organization has been certified. Flawed market designs and inadequate market power mitigation, as well as the financial distress of merchant generators, pose considerable risks. It was suggested that these risks could trigger transmission loading relief incidents, local outages or widespread outages. In the absence of mandatory reliability standards with penalties, and complementary market rules for mitigating generation and transmission market power, economic incentives will encourage other forms of opportunistic behavior that may be the root cause of other outages. Public concern regarding these risks to grid reliability may result in lost public support for competitive electricity markets. Proposed solutions include the certification of a new Electric Reliability Organization to establish and enforce mandatory reliability standards, and granting the Federal Energy Regulatory Commission

  8. Liberalization of power generation sector in the Croatian electricity market

    International Nuclear Information System (INIS)

    Viskovic, Alfredo

    2005-01-01

    The electricity market liberalization and the restructuring of power utilities eventually leads to the establishment of a single electricity market in Europe, which is especially important for efficiency gains in electricity generation coupled with increased security of supply, economic competitiveness and fulfillment of environmental requirements. The European electricity market Directives as well as the Energy Community Treaty for South East Europe (legislative Menu) have remarkable impact on the restructuring of the Croatian power sector and the development of electricity generation. The Croatian model of restructuring includes legal un bundling (in the ownership of one holding company - Hrvatska Elektroprivreda (HEP)). The operation of HEP Group and its subsidiaries in the conditions of partially opened electricity market in an important element that shapes the interactions of competitive activities and regulated activities in the environment influenced by exogenous factors a thirteen percent electricity are controlled by the Energy Market Operator (MO), the Transmission System Operator (TSO) and the Energy Regulatory Agency (CERA). The introduction of eligible procedures and newly created operative procedures for power system operation, are creating completely new conditions for competition in the power generation sector, where almost all power plants are owned by HEP. New generating capacities in Croatia can be built through tendering and licensing procedures carried out by the Regulator. Electricity prices are still regulated by the Government (below the cost reflective level), there is a small share of industrial consumers and the annual electricity production is 12 TWh, with relatively large share of hydro plants. All these have implications on the development of the power generation sector in Croatia as well as on electricity market operation. The subject matter of this paper is an impact of power system restructuring and electricity market opening on the

  9. Transmission investment in the Peruvian electricity market: Theory and applications

    International Nuclear Information System (INIS)

    Ruiz, Erix; Rosellón, Juan

    2012-01-01

    This research presents an application of the mechanism in (HRV) to promote electricity transmission network expansion in the Peruvian electricity transmission system known as SEIN (Sistema Eléctrico Interconectado Nacional). The HRV mechanism combines the merchant and regulatory approaches to promote investment into transmission grids. This mechanism gives incentives for efficient investment in expansion of the network by rebalancing over time the fixed and variable charges of a two-part tariff in the framework of a wholesale electricity market with locational pricing. The expansion of the network is carried out through the sale of Financial Transmission Rights (FTRs) for the congested lines. The mechanism is applied for 103 nodes of the SEIN using detailed characteristics of generators, nodes and transmission lines. Under Laspeyres weights and linear cost of expansion of transmission capacity, it is shown that prices converge to lower price levels as a result of increased transmission capacity.

  10. Efficient design of multituned transmission line NMR probes: the electrical engineering approach.

    Science.gov (United States)

    Frydel, J A; Krzystyniak, M; Pienkowski, D; Pietrzak, M; de Sousa Amadeu, N; Ratajczyk, T; Idzik, K; Gutmann, T; Tietze, D; Voigt, S; Fenn, A; Limbach, H H; Buntkowsky, G

    2011-01-01

    Transmission line-based multi-channel solid state NMR probes have many advantages regarding the cost of construction, number of RF-channels, and achievable RF-power levels. Nevertheless, these probes are only rarely employed in solid state-NMR-labs, mainly owing to the difficult experimental determination of the necessary RF-parameters. Here, the efficient design of multi-channel solid state MAS-NMR probes employing transmission line theory and modern techniques of electrical engineering is presented. As technical realization a five-channel ((1)H, (31)P, (13)C, (2)H and (15)N) probe for operation at 7 Tesla is described. This very cost efficient design goal is a multi port single coil transmission line probe based on the design developed by Schaefer and McKay. The electrical performance of the probe is determined by measuring of Scattering matrix parameters (S-parameters) in particular input/output ports. These parameters are compared to the calculated parameters of the design employing the S-matrix formalism. It is shown that the S-matrix formalism provides an excellent tool for examination of transmission line probes and thus the tool for a rational design of these probes. On the other hand, the resulting design provides excellent electrical performance. From a point of view of Nuclear Magnetic Resonance (NMR), calibration spectra of particular ports (channels) are of great importance. The estimation of the π/2 pulses length for all five NMR channels is presented. Copyright © 2011 Elsevier Inc. All rights reserved.

  11. Some problems relating to the transmission of electrical power at very high voltage

    Energy Technology Data Exchange (ETDEWEB)

    Goldstein, A

    1965-01-01

    Some of the technical and economic factors which influence the choice of a transmission system, particularly a very high voltage one, are discussed. The stability of transmission overvoltages at mains frequency and their control by means of compensating reactances is described. Overvoltages due to circuit-breaker operation and those of atmospheric origin, and appropriate protective devices, the behaviour of equipment at 750 kV, and problems of testing are included. Finally, the 735 kV network now being installed to carry 5300 MW of hydroelectric power 650 km from the Manicouagan River to Quebec and Montreal is described.

  12. Electric power annual, 1991

    International Nuclear Information System (INIS)

    1993-01-01

    The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. The 1991 edition has been enhanced to include statistics on electric utility demand-side management and nonutility supply. ''The US Electric Power Industry at a Glance'' section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; electricity sales, revenue, and average revenue per kilowatthour sold; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms

  13. Electric power annual 1992

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-06

    The Electric Power Annual presents a summary of electric utility statistics at national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts and the general public with historical data that may be used in understanding US electricity markets. The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. ``The US Electric Power Industry at a Glance`` section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; retail sales; revenue; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms.

  14. Electrical power distribution control methods, electrical energy demand monitoring methods, and power management devices

    Science.gov (United States)

    Chassin, David P [Pasco, WA; Donnelly, Matthew K [Kennewick, WA; Dagle, Jeffery E [Richland, WA

    2011-12-06

    Electrical power distribution control methods, electrical energy demand monitoring methods, and power management devices are described. In one aspect, an electrical power distribution control method includes providing electrical energy from an electrical power distribution system, applying the electrical energy to a load, providing a plurality of different values for a threshold at a plurality of moments in time and corresponding to an electrical characteristic of the electrical energy, and adjusting an amount of the electrical energy applied to the load responsive to an electrical characteristic of the electrical energy triggering one of the values of the threshold at the respective moment in time.

  15. New nuclear power plants and the electricity market competition

    International Nuclear Information System (INIS)

    Ruska, M.; Koreneff, G.

    2009-11-01

    The study assesses the effects the different nuclear power plant projects would have on crossownership, market concentration and market power in electricity market. The analyses are given both for Finnish and Nordic power markets. The authors feel that the electricity market should primarily be viewed as a common Nordic market in the future. During 2000 to 2008 the hours when Finland was an own price area ranged from 1 % to 29 % as annual averages. In the future it will be more and more seldom that Finland will become an own deficit price area, because the cross-border transmission capacity to Sweden will increase as will Finnish electricity production capacity. In addition, the extension of Nord Pool to the Baltic will increase the size of the market. The ownership of power plants is typically organized through power share companies in Finland. Two of the three nuclear power plant projects are joint ventures with several electricity producers and consumers. The current ownership relations and what effects the new projects might have on them were analyzed in this study. The competitiveness of different electricity production forms in the future was assessed using different market scenarios based on varying demand expectations. The capacity structure was assumed to stay quite unchanged, where the biggest change is expected to come from new renewable power capacity due to EU targets. Conventional condensing power production will decrease and Nordic electricity exports will increase in the future. The market concentration would increase in Finland with new nuclear plants, the most if Fortum were the builder. Vattenfall has a decidedly larger electricity production in the Nordic countries than Fortum, and Vattenfall's capacity would be unchanged by the new planned nuclear plants. The nuclear power plant projects do not therefore increase market concentration significantly on a Nordic level. Nuclear power is not used for day or hour regulation in Finland, which means

  16. Power Transmission Scheduling for Generators in a Deregulated Environment Based on a Game-Theoretic Approach

    Directory of Open Access Journals (Sweden)

    Bingtuan Gao

    2015-12-01

    Full Text Available In a deregulated environment of the power market, in order to lower their energy price and guarantee the stability of the power network, appropriate transmission lines have to be considered for electricity generators to sell their energy to the end users. This paper proposes a game-theoretic power transmission scheduling for multiple generators to lower their wheeling cost. Based on the embedded cost method, a wheeling cost model consisting of congestion cost, cost of losses and cost of transmission capacity is presented. By assuming each generator behaves in a selfish and rational way, the competition among the multiple generators is formulated as a non-cooperative game, where the players are the generators and the strategies are their daily schedules of power transmission. We will prove that there exists at least one pure-strategy Nash equilibrium of the formulated power transmission game. Moreover, a distributed algorithm will be provided to realize the optimization in terms of minimizing the wheeling cost. Finally, simulations were performed and discussed to verify the feasibility and effectiveness of the proposed non-cooperative game approach for the generators in a deregulated environment.

  17. High Voltage AC underground cable systems for power transmission

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Silva, Filipe Miguel Faria da

    2016-01-01

    researching electrical engineering topics related to using underground cables for power transmission at EHV level and including the 420 kV level. The research topics were laid down by ET/AAU and Energinet.dk in the DANPAC (DANish Power systems with AC Cables) research project. The main topics are discussed...... on the basis of 39 references published by ET/AAU and Energinet.dk. Part I of the paper explains the events that lead to the research project, reactive power compensation, modelling for transient studies, including field measurements and improvements to the existing models, and temporary overvoltages due...... to resonances. Part II covers transient phenomena, harmonics in cables, system modelling for different phenomena, main and backup protections in cable-based networks, online fault detection and future trends....

  18. High Voltage AC underground cable systems for power transmission

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Silva, Filipe Miguel Faria da

    2016-01-01

    researching electrical engineering topics related to using underground cables for power transmission at EHV level and including the 420 kV level. The research topics were laid down by ET/AAU and Energinet.dk in the DANPAC (DANish Power systems with Ac Cables) research project. The main topics are discussed...... on the basis of 39 references published by ET/AAU and Energinet.dk. Part I of the paper explains the events that lead to the research project, reactive power compensation, modelling for transient studies, including field measurements and improvements to the existing models, and temporary overvoltages due...... to resonances. Part II covers transient phenomena, harmonics in cables, system modelling for different phenomena, main and backup protections in cable-based networks, online fault detection and future trends....

  19. Electric power infrastructure in Asia and the Pacific: economics and investment opportunity

    International Nuclear Information System (INIS)

    Sudarsono, B.S.; Saha, P.C.

    1995-01-01

    The purpose of this paper is to discuss the status and potential of the Asia Pacific electric power infrastructure, including the transmission and distribution system, to highlight some of the most relevant issues in the sector and to look at the prospect of investment opportunity for the private sector in the power industry

  20. HVDC transmission from isorated nuclear power plant

    International Nuclear Information System (INIS)

    Takenaka, Kiyoshi; Takasaki, Masahiro; Ichikawa, Tatemi; Hayashi, Toshiyuki

    1985-01-01

    HVDC transmission directly from nuclear power plant is considered as one of the patterns of long distance and large capacity transmission system. This reports considers two route HVDC transmission from PWR type nuclear power plant, and analyzes dynamic response characteristics due to bus fault, main protection failure and etc. using the AC-DC Power System Simulator. (author)

  1. A Modular Neural Network Scheme Applied to Fault Diagnosis in Electric Power Systems

    Directory of Open Access Journals (Sweden)

    Agustín Flores

    2014-01-01

    Full Text Available This work proposes a new method for fault diagnosis in electric power systems based on neural modules. With this method the diagnosis is performed by assigning a neural module for each type of component comprising the electric power system, whether it is a transmission line, bus or transformer. The neural modules for buses and transformers comprise two diagnostic levels which take into consideration the logic states of switches and relays, both internal and back-up, with the exception of the neural module for transmission lines which also has a third diagnostic level which takes into account the oscillograms of fault voltages and currents as well as the frequency spectrums of these oscillograms, in order to verify if the transmission line had in fact been subjected to a fault. One important advantage of the diagnostic system proposed is that its implementation does not require the use of a network configurator for the system; it does not depend on the size of the power network nor does it require retraining of the neural modules if the power network increases in size, making its application possible to only one component, a specific area, or the whole context of the power system.

  2. Economic impact of electric power limitation in Rio de Janeiro

    International Nuclear Information System (INIS)

    Schilling, M.Th.; Gomes, P.; Aires, J.C.O.

    1993-01-01

    The metropolitan region of Rio de Janeiro constitutes an important center of charge of Brazil in relation to electric power consumption. This region is essentially served by light, enterprise concessionary responsible by sub transmission and distribution of energy to residential, commercial and industrial consumers. 9 refs, 10 tabs

  3. Application of low bitrate image coding to surveillance of electric power facilities. Part 1. Proposal of low bitrate coding for surveillance of electric power facilities and examination of facilities region extraction method; Denryoku setsubi kanshi eno tei rate fugoka hoshiki no tekiyo. 1. Setsubi kanshiyo fugoka hoshiki no teian to setsubi ryoiki chushutsuho no kento

    Energy Technology Data Exchange (ETDEWEB)

    Murata, H.; Ishino, R. [Central Research Institute of Electric Power Industry, Tokyo (Japan)

    1996-03-01

    Current status of low bitrate image coding has been investigated, and a low bitrate coding suitable for the surveillance of electric power facilities has been proposed, to extract its problems to be solved. For the conventional image coding, the waveform coding has been used by which the images are processed as signals. While, for the MPEG-4, a coding method with considering the image information has been proposed. For these coding methods, however, image information lacks details primarily, when lowering the bitrate. Accordingly, these methods can not be applied when the details in the images are important, such as in the case of surveillance of facilities. Then, the coding method has been proposed by expanding the partially detailed coding, and by separating constituent images of facilities, such as power cables and steel towers, designated by operators. It is the special feature of this method that the method can easily respond to the low bitrate and the detailed information can be conserved by using the structure extraction coding for the designated partial image which is generally processed by the low bitrate waveform coding. 29 refs., 17 figs., 1 tab.

  4. Transmission Line Adapted Analytical Power Charts Solution

    Science.gov (United States)

    Sakala, Japhet D.; Daka, James S. J.; Setlhaolo, Ditiro; Malichi, Alec Pulu

    2017-08-01

    The performance of a transmission line has been assessed over the years using power charts. These are graphical representations, drawn to scale, of the equations that describe the performance of transmission lines. Various quantities that describe the performance, such as sending end voltage, sending end power and compensation to give zero voltage regulation, may be deduced from the power charts. Usually required values are read off and then converted using the appropriate scales and known relationships. In this paper, the authors revisit this area of circle diagrams for transmission line performance. The work presented here formulates the mathematical model that analyses the transmission line performance from the power charts relationships and then uses them to calculate the transmission line performance. In this proposed approach, it is not necessary to draw the power charts for the solution. However the power charts may be drawn for the visual presentation. The method is based on applying derived equations and is simple to use since it does not require rigorous derivations.

  5. Investments and price formation in a liberalized electric power market. Appendices

    International Nuclear Information System (INIS)

    Morthorst, P.E.

    2005-06-01

    How will the electric power prices in the Nordic electric power market develop if the generation capacity in the coming 10 to 15 years is increased considerably? And what are the conditions for investors to initiate new investments in power plants? Briefly speaking - these are the issues for the project that is reported in this report. The basis for the project has been the Nordic electric power market model and its capability to handle the future extension of the necessary generating capacity. The main issue in the project has been a quantitative analysis of what the prices in the Nordic electric power market will be in the future, depending on the size of new investments in the power generating capacity. The appendix volume of the project report contains detailed descriptions of the three models that are used: the Balmorel model, the investment model, and the MARS model. The Balmorel model is a partial equilibrium model that describes a coherent, international electric power system and combined heat and power system. The model was developed in 2000 through international co-operation with the aim to have a model for analysing international aspects in the Baltic area. The investment model analyses and models the investment decisions in a liberalized Nordic electric power market. It is an exogenous model constructed outside the Balmorel model but uses the price pictures from the Balmorel model as input. MARS (MARket Simulation) is Eltra's (a Danish electric power transmission company) market model for simulating prices, production, demand and exchanges in the power market. The model covers the Nordic countries (Nord Pool) and Northern Germany. (LN)

  6. Parameters optimization for magnetic resonance coupling wireless power transmission.

    Science.gov (United States)

    Li, Changsheng; Zhang, He; Jiang, Xiaohua

    2014-01-01

    Taking maximum power transmission and power stable transmission as research objectives, optimal design for the wireless power transmission system based on magnetic resonance coupling is carried out in this paper. Firstly, based on the mutual coupling model, mathematical expressions of optimal coupling coefficients for the maximum power transmission target are deduced. Whereafter, methods of enhancing power transmission stability based on parameters optimal design are investigated. It is found that the sensitivity of the load power to the transmission parameters can be reduced and the power transmission stability can be enhanced by improving the system resonance frequency or coupling coefficient between the driving/pick-up coil and the transmission/receiving coil. Experiment results are well conformed to the theoretical analysis conclusions.

  7. Fabrication and electric measurements of nanostructures inside transmission electron microscope

    International Nuclear Information System (INIS)

    Chen, Qing; Peng, Lian-Mao

    2011-01-01

    Using manipulation holders specially designed for transmission electron microscope (TEM), nanostructures can be characterized, measured, modified and even fabricated in-situ. In-situ TEM techniques not only enable real-time study of structure-property relationships of materials at atomic scale, but also provide the ability to control and manipulate materials and structures at nanoscale. This review highlights in-situ electric measurements and in-situ fabrication and structure modification using manipulation holder inside TEM. -- Research highlights: → We review in-situ works using manipulation holder in TEM. → In-situ electric measurements, fabrication and structure modification are focused. → We discuss important issues that should be considered for reliable results. → In-situ TEM is becoming a very powerful tool for many research fields.

  8. Electricity transmission pricing. How contracts must reflect costs

    International Nuclear Information System (INIS)

    Shuttleworth, G.

    1996-01-01

    Two basic structures of transmission systems are distinguished: transmission channels offered through an integrated electric utility and open access offered over an independent network. The first structure allows the application of 'top-down pricing', where transmission prices are derived from customer tariffs less avoidable generation costs. Transmission prices in the second structure must be derived from a 'bottom-up' analysis of transmission costs, including building capacity, marginal losses, and congestion. 5 refs

  9. Transmission capacities and competition in Western European electricity market

    International Nuclear Information System (INIS)

    Spiridonova, Olga

    2016-01-01

    The integration of national electricity markets into a single European one is expected to reduce the ability of dominant players to exercise market power. This paper investigates whether or not existing transmission capacities of cross-border interconnectors are sufficient to achieve this result and create vigorous competition in the market. A model with two decision levels is used. On the first level profit maximizing generators play Cournot game against each other. On the last level the system operator clears the market and determines flows in the network to maximize social welfare subject to a set of physical constraints. As each strategic generator anticipates her impact on equilibrium prices and congestion in the system, her optimization problem is subject to equilibrium constraints from the system operator's problem. The analysis demonstrates that interconnector capacities in Western Europe are insufficient for integration alone to reduce the exercise of market power. I compare several possible competition-enhancing policies: expansion of interconnectors and different scenarios of national markets’ restructuring. I show that although increase of line capacity is a useful tool to stimulate competition in an integrated market, it is not a substitute for the restructuring of large players. - Highlights: •The ability of integration to reduce market power depends on transmission capacities. •In the model firms compete in quantities, know their impact on prices and congestion. •In Western Europe integration will not diminish market power. •Line extension stimulates competition but is not a substitute for the regulation.

  10. A Nodal Pricing Analysis of the Future German Electricity Market

    International Nuclear Information System (INIS)

    Ozdemir, O.; Hers, J.S.; Bartholomew Fisher, E.; Brunekreeft, G.; Hobbs, B.F.

    2009-05-01

    The electricity market in Germany is likely to undergo several significant structural changes over the years to come. Here one may think of Germany's ambitious renewable agenda, the disputed decommissioning of nuclear facilities, but also unbundling of TSO's as enforced by European regulation. This study is a scenario-based analysis of the impact of different realizations of known investment plans for transmission and generation capacity on the future German power market while accounting for internal congestion. For this analysis the static equilibrium model of the European electricity market COMPETES is deployed, including a 10-node representation of the German highvoltage grid. Results for the multi-node analysis indicate that price divergence and congestion are likely to arise in the German market as renewable additions affecting mainly the North of Germany, the debated decommissioning of nuclear facilities in the South, and the expected decommissioning of coal-fired facilities in Western Germany appear to render current investment plans for transmission capacity insufficient. The current system of singlezone pricing for the German market may therewith be compromised. However, transmission additions would not benefit all market parties, with producers in exporting regions and consumers in importing regions being the main beneficiaries. Vertical unbundling of German power companies could increase the incentive for constructing transmission lines if generation capacity would cause Germany to be a net-importing country. In case Germany remains a net-exporting country, the effects of vertical unbundling on cross-border capacity are less clear cut.

  11. Influence of big power motors for irrigation of electric systems

    International Nuclear Information System (INIS)

    Shimoda, M.; Gialuca, V.; Trombetta, O.R.

    1988-01-01

    The evolution of rural electrification in CPFL - Companhia Paulista de Forca e Luz, Sao Paulo State, Brazil, and the influence of big power motors installation for irrigation in electric system are shown. Considerations about rural market, energy consumption, planning of distribution and transmission line and some calculations are also presented. (author)

  12. Electric power system / emergency power supply

    International Nuclear Information System (INIS)

    Dorn, P.G.

    1980-01-01

    One factor of reliability of reactor safety systems is the integrity of the power supply. The purpose of this paper is a review and a discussion of the safety objectives required for the planning, licensing, manufacture and erection of electrical power systems and components. The safety aspects and the technical background of the systems for - the electric auxiliary power supply system and - the emergency power supply system are outlined. These requirements result specially from the safety standards which are the framework for the studies of safety analysis. The overall and specific requirements for the electrical power supply of the safety systems are demonstrated on a 1300 MW standard nuclear power station with a pressurized water reactor. (orig.)

  13. Optimization and Control of Electric Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Lesieutre, Bernard C. [Univ. of Wisconsin, Madison, WI (United States); Molzahn, Daniel K. [Univ. of Wisconsin, Madison, WI (United States)

    2014-10-17

    The analysis and optimization needs for planning and operation of the electric power system are challenging due to the scale and the form of model representations. The connected network spans the continent and the mathematical models are inherently nonlinear. Traditionally, computational limits have necessitated the use of very simplified models for grid analysis, and this has resulted in either less secure operation, or less efficient operation, or both. The research conducted in this project advances techniques for power system optimization problems that will enhance reliable and efficient operation. The results of this work appear in numerous publications and address different application problems include optimal power flow (OPF), unit commitment, demand response, reliability margins, planning, transmission expansion, as well as general tools and algorithms.

  14. Analysis and evaluation of hybrid scooter transmission systems

    Energy Technology Data Exchange (ETDEWEB)

    Sheu, Kuen-Bao [Department of Vehicle Engineering, National Formosa University, 64 Wunhua Road, Huwei, Yuenlin 63208 (China)

    2007-12-15

    This paper presents a new design concept of transmissions for the hybrid scooters. These transmissions consist of a one-degree-of-freedom planetary gear train and a two-degree-of-freedom planetary gear train to from a split power system and to combine the power of two power sources, a gasoline engine and an electric motor. In order to maximize the performance and reduce emissions, the transmissions can provide a hybrid scooter to run five operating modes: electric motor mode; engine mode; engine/charging mode; power mode, and regenerative braking mode. The main advantages of the transmissions proposed in this paper include the use of only one electric motor/generator, need not use clutch/brake for the shift of the operating modes, and high efficiency. The kinematics, power flow, and mechanical efficiency analyzes are performed; and according to these results, the evaluation of transmission power performances are accomplished. (author)

  15. Change in plan for installation of nuclear reactor in Genkai Nuclear Power Plant of Kyushu Electric Power Co., Inc. (change in plan for No.3 and No.4 nuclear reactor facilities) (report)

    International Nuclear Information System (INIS)

    1987-01-01

    This report, compiled by the Nuclear Safety Commission to be submitted to the Minister of International Trade and Industry, deals with studies on a proposed change in the plan for the installation of nuclear reactors in the Genkai Nuclear Power Plant of Kyushu Electric Power Co., Inc. (change in the plan for the No.3 and No.4 nuclear reactor facilities). The conclusions of and principles for the examination and evaluation are described first. The studies carried out are focused on the safety of the facilities, and it is concluded that part of the proposed change is appropriate with respect to the required technical capability and that part of the change will not have adverse effects on the safety design of the facilities. The examination of the safety design of the reactor facilities cover the reactivity control, new material for the steam generator, design of chemical and volume control systems, design of liquid waste treatment facilities, integration of all confinement vessel spray rings, and design of the diesel power generator. It is confirmed that all of them can meet the safety requirements. Studies and analyses are also made of the emission of radiations to the surrounding environment, abnormal transient changes during operations, and possible accidents. (Nogami, K.)

  16. EFFECTS OF THE PENETRATION OF WIND POWER IN THE BRAZILIAN ELECTRICITY MARKET

    Directory of Open Access Journals (Sweden)

    Milton M. Herrera

    2016-12-01

    Full Text Available Climate variability has been the main driver for renewables in the Brazilian electricity market. This article analyzes the vulnerabilities of the dependence on hydropower in renewable energy production due to climate variation, as well as wind power penetration in Brazil, given a set of wind industry policies. Despite Brazilian renewable energy increase, the study shows the impact in energy supply in north region, due to the lack of transmission infrastructure. In Brazil, the potential trade-offs between renewables growth, and transmission infrastructure inconsistencies in terms of policy implementation are not yet well analyzed. Simulation results show the potential conflicts between energy policies aimed at increasing the wind power supply and boundaries in transmission infrastructure.

  17. Effects of the penetration of wind power in the brazilian electricity market

    Directory of Open Access Journals (Sweden)

    Milton M. Herrera

    2016-12-01

    Full Text Available Climate variability has been the main driver for renewables in the Brazilian electricity market. This article analyzes the vulnerabilities of the dependence on hydropower in renewable energy production due to climate variation, as well as wind power penetration in Brazil, given a set of wind industry policies. Despite Brazilian renewable energy increase, the study shows the impact in energy supply in north region, due to the lack of transmission infrastructure. In Brazil, the potential trade-offs between renewables growth, and transmission infrastructure inconsistencies in terms of policy implementation are not yet well analyzed. Simulation results show the potential conflicts between energy policies aimed at increasing the wind power supply and boundaries in transmission infrastructure.

  18. Electrical power systems for distributed generation

    Energy Technology Data Exchange (ETDEWEB)

    Robertson, T.A.; Huval, S.J. [Stewart & Stevenson Services, Inc., Houston, TX (United States)

    1996-12-31

    {open_quotes}Distributed Generation{close_quotes} has become the {open_quotes}buzz{close_quotes} word of an electric utility industry facing deregulation. Many industrial facilities utilize equipment in distributed installations to serve the needs of a thermal host through the capture of exhaust energy in a heat recovery steam generator. The electrical power generated is then sold as a {open_quotes}side benefit{close_quotes} to the cost-effective supply of high quality thermal energy. Distributed generation is desirable for many different reasons, each with unique characteristics of the product. Many years of experience in the distributed generation market has helped Stewart & Stevenson to define a range of product features that are crucial to most any application. The following paper will highlight a few of these applications. The paper will also examine the range of products currently available and in development. Finally, we will survey the additional services offered by Stewart & Stevenson to meet the needs of a rapidly changing power generation industry.

  19. A methodology for Electric Power Load Forecasting

    Directory of Open Access Journals (Sweden)

    Eisa Almeshaiei

    2011-06-01

    Full Text Available Electricity demand forecasting is a central and integral process for planning periodical operations and facility expansion in the electricity sector. Demand pattern is almost very complex due to the deregulation of energy markets. Therefore, finding an appropriate forecasting model for a specific electricity network is not an easy task. Although many forecasting methods were developed, none can be generalized for all demand patterns. Therefore, this paper presents a pragmatic methodology that can be used as a guide to construct Electric Power Load Forecasting models. This methodology is mainly based on decomposition and segmentation of the load time series. Several statistical analyses are involved to study the load features and forecasting precision such as moving average and probability plots of load noise. Real daily load data from Kuwaiti electric network are used as a case study. Some results are reported to guide forecasting future needs of this network.

  20. Cryogenic System for a High-Temperature Superconducting Power Transmission Cable

    International Nuclear Information System (INIS)

    Demko, J.A.; Gouge, M.J.; Hughey, R.L.; Lue, J.W.; Martin, R.; Sinha, U.; Stovall, J.P.

    1999-01-01

    High-temperature superconducting (HTS) cable systems for power transmission are under development that will use pressurized liquid nitrogen to provide cooling of the cable and termination hardware. Southwire Company and Oak Ridge National Laboratory have been operating a prototype HTS cable system that contains many of the typical components needed for a commercial power transmission application. It is being used to conduct research in the development of components and systems for eventual commercial deployment. The cryogenic system was built by Air Products and Chemicals, Allentown, Pennsylvania, and can circulate up to 0.35 kg/s of liquid nitrogen at temperatures as low as 67 K at pressures of 1 to 10 bars. Sufficient cooling is provided for testing a 5-m-long HTS transmission cable system that includes the terminations required for room temperature electrical connections. Testing of the 5-m HTS transmission cable has been conducted at the design ac conditions of 1250 A and 7.5 kV line to ground. This paper contains a description of the essential features of the HTS cable cryogenic system and performance results obtained during operation of the system. The salient features of the operation that are important in large commercial HTS cable applications will be discussed

  1. Project clean city: joint trenching for urban facilities; Projeto cidade limpa: vala tecnica para instalacoes urbanas - sistema infavias

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Aloisio Pereira da [Companhia de Gas de Santa Catarina (SCGAS), Florianopolis, SC (Brazil)

    2012-07-01

    This study aims to propose a join trench for urban facilities, using concepts related to planning and urban cadastre, sustainability of resource use, and mainly focus on safety during construction, operation and maintenance. The model proposes the replacement of individual construction of facilities of natural gas, potable water, telephone, data transmission and electricity (low and medium voltage) by a system that encompasses all of these facilities in a trench, the deployment may also occur in the same period or if necessary, or at different times, creating flexibility in the system. The security of facilities due to the operational interface between the concessionaires and clients will be ensured by the protected by reinforced concrete structure, designed using the concept of 'fail-safing', derived from the Toyota Production System. The joint trench model was designed from the perspective of sustainability and technological innovation for your future use of the new design of power supply, through the concept of 'Smart Grid' with the use of bidirectional power system transmission and distribution, in decentralized model for generating electricity through cogeneration systems with natural gas. (author)

  2. Study on Stochastic Optimal Electric Power Procurement Strategies with Uncertain Market Prices

    Science.gov (United States)

    Sakchai, Siripatanakulkhajorn; Saisho, Yuichi; Fujii, Yasumasa; Yamaji, Kenji

    The player in deregulated electricity markets can be categorized into three groups of GENCO (Generator Companies), TRNASCO (Transmission Companies), DISCO (Distribution Companies). This research focuses on the role of Distribution Companies, which purchase electricity from market at randomly fluctuating prices, and provide it to their customers at given fixed prices. Therefore Distribution companies have to take the risk stemming from price fluctuation of electricity instead of the customers. This entails the necessity to develop a certain method to make an optimal strategy for electricity procurement. In such a circumstance, this research has the purpose for proposing the mathematical method based on stochastic dynamic programming to evaluate the value of a long-term bilateral contract of electricity trade, and also a project of combination of the bilateral contract and power generation with their own generators for procuring electric power in deregulated market.

  3. Environmental challenges and opportunities of the evolving North American electricity market : European electricity generating facilities: an overview of European regulatory requirements and standardization efforts

    International Nuclear Information System (INIS)

    Nichols, L.

    2002-06-01

    Several factors are affecting power generating facilities, such as the opening of both electricity and gas markets, and the pressure applied on generators and governments to ensure a steady energy supply for consumers. An additional factor is the pressure for the closing of nuclear power facilities. European siting and emissions requirements for coal-fired and natural gas generating facilities were presented in this background paper. In addition, the author provided an overview of the standardization process in place in Europe. The European Union and its functioning were briefly described, as well as a listing of relevant organizations. The current trends were examined. The document first introduced the European Union, and the next section dealt with Regulatory regime: the internal energy market. The third section examined the issue of Regulatory regime: generation and environmental regulations. Section four presented environmental management systems, followed by a section on standardization. Section six discussed European organizations involved in electricity issues, while the following section dealt with European commission programs. The last section briefly looked at the trends in the electricity sector, broaching topics such as compliance, electricity generation, and emissions trading. 52 refs., 2 tabs

  4. Possibilities for Automatic Control of Hydro-Mechanical Transmission and Birotating Electric Machine

    Directory of Open Access Journals (Sweden)

    V. V. Mikhailov

    2014-01-01

    Full Text Available The paper presents mathematical models and results of virtual investigations pertaining to the selected motion parameters of a mobile machine equipped with hydro mechanical and modernized transmissions. The machine has been tested in similar technological cycles and it has been equipped with a universal automatic control system. Changes in structure and type of power transmission have been obtained with the help of a control algorithm including an extra reversible electric machine which is switched in at some operational modes.Implementation of the proposed  concept makes it possible to obtain and check the improved C-code of the control system and enhance operational parameters of the transmission and machine efficiency, reduce slippage and tire wear while using braking energy for its later beneficial use which is usually considered as a consumable element.

  5. Development of a superconducting cable for transmission of high electric power

    International Nuclear Information System (INIS)

    Moisson, F.; Leroux, J.M.

    1971-01-01

    The opportunities opened by the use of cryoresistive and superconducting materials in underground transmission systems have led to a cryocable program. A first set of problems associated with the development of cryogenic cables deals with the cable system, i.e., design, safety, terminal equipment including leads, cryogenic equipment, refrigerators, and problems related to overload capability and reliability. A second set concerns the cable itself, i.e., scientific and technological problems associated with the conductor, the electrical insulation, and the thermal exchange between conductor and helium. Useful experience is gained on the design problems and on the technological problems involved in the construction of a cryoconducting cable. A 20-M aluminum cable cooled down to 25 0 K with pressurized helium flow was built and tested with 3500-A dc under 20 Kv; results are presented. On this model the following types of problems were solved. First, mechanical problems concerning cooling of the cable, thermal contraction of the pipes, electrical insulation and conductors, construction of an invariable cable constituted by elementary helically wound conductors were solved. Second, thermal problems of reduction of heat leaks, conception of thermal insulation, and segmentation of vacuum jackets were solved. Third, electrical problems of design of 300 0 to 25 0 K leads were solved; this problem of losses at both ends is, in proportion, more important for the short model than for long cable. Finally, refrigeration problems of helium and nitrogen flows, thermal shields and design of refrigerators (optimal capacity and spacing) were solved

  6. Electric power grid interconnection in Northeast Asia

    International Nuclear Information System (INIS)

    Yun, Won-Cheol; Zhang, Zhong Xiang

    2006-01-01

    In spite of regional closeness, energy cooperation in Northeast Asia has remained unexplored. However, this situation appears to be changing. The government of South Korea seems to be very enthusiastic for power grid interconnection between the Russian Far East and South Korea to overcome difficulties in finding new sites for building power facilities to meet its need for increased electricity supplies. This paper analyzes the feasibility of this electric power grid interconnection route. The issues addressed include electricity market structures; the prospects for electric power industry restructuring in the Russian Federation and South Korea; the political issues related to North Korea; the challenges for the governments involved and the obstacles anticipated in moving this project forward; project financing and the roles and concerns from multilateral and regional banks; and institutional framework for energy cooperation. While there are many technical issues that need to be resolved, we think that the great challenge lies in the financing of this commercial project. Thus, the governments of the Russian Federation and South Korea involved in the project need to foster the development of their internal capital markets and to create confidence with international investors. To this end, on energy side, this involves defining a clear energy policy implemented by independent regulators, speeding up the already started but delayed reform process of restructuring electric power industry and markets, and establishing a fair and transparent dispute resolution mechanism in order to reduce non-commercial risks to a minimum. The paper argues that establishing a framework for energy cooperation in this region will contribute positively towards that end, although views differ regarding its specific form. Finally, given that North Korea has a crucial transit role to play and faces a very unstable political situation, it is concluded that moving the project forward needs to be

  7. Institutional and programmatic suggestions for satisfying public policy responsibilities in a retail competitive electric industry

    Energy Technology Data Exchange (ETDEWEB)

    Tonn, B.E.; Schweitzer, M. [Oak Ridge National Lab., TN (United States)

    1997-01-01

    The emergence of retail competition in the US electric power industry places at risk various environmental and social programmes such as demand side management, low income programmes and renewable energy. This paper presents institutional and programmatic suggestions for satisfying these kinds of public policy responsibilities in a disintegrated industry. Suggestions include customer owned electricity franchises, electricity facility siting marketplaces, electric industry foresight councils, model systems programmes, integrated social services programmes, collaborative electric service programmes, ISO standards and portfolio standards. These recommendations would be funded by a national transmission charge, a state level distribution charge and franchise level sales taxes, to be paid by transmission organizations, distribution organizations and electricity consumers, respectively. (author)

  8. The Economics of Storage, Transmission and Drought: Integrating Variable Wind Power into Spatially Separated Electricity Grids

    NARCIS (Netherlands)

    Scora, H.; Sopinka, A.; Kooten, van G.C.

    2012-01-01

    To mitigate the high variability of wind and make it a more viable renewable energy source, observers recommend greater integration of spatially-separated electrical grids, with high transmission lines linking load centers, scattered wind farms and hydro storage sites. In this study, we examine the

  9. Analysis of competition and market power in the wholesale electricity market in India

    International Nuclear Information System (INIS)

    Shukla, Umesh Kumar; Thampy, Ashok

    2011-01-01

    The electricity reforms were initiated in India with the objective of promoting competition in the electricity market. In order to promote competition, the Electricity Act 2003 was enacted and various policy initiatives were taken by the Government of India. Central Electricity Regulatory Commission (CERC) also facilitated competition through the regulatory framework of availability based tariff, Indian Electricity Grid Code, open access in inter-state transmission, inter-state trading and power exchanges. Despite these initiatives, electricity prices increased in the Wholesale Electricity Market in India (WEMI). This paper analyses the market structure and competitiveness in the WEMI. There are, of course, various potential reasons for the rise in the electricity price. This paper seeks to investigate, if market power was one of the reasons for increase in market prices. Concentration ratio, Herfindahl-Hirschman index, Supply Margin Assessment, and Residual Supply Index have been used to measure market power. This paper also uses the price-cost mark-up to examine, if exercise of market power led to higher margins. The analysis suggests that market power of firms may be part of the reason for the increase in electricity prices in WEMI. The study suggests various measures to increase competition in the WEMI.

  10. Development of a PLC modem for data transmission over a PWM power supply

    Science.gov (United States)

    Batard, Christophe; Ginot, Nicolas; Mannah, Marc Anthony; Millet, Christophe; Poitiers, Frédéric

    2014-04-01

    In variable-speed electrical drive and online conditioning monitoring, a feedback loop is required in order to transmit the sensor information from the motor to the controller close to the inverter. Additional cabling is used for signalling. This extra cabling has a significant cost and data transmission may not be reliable. Thus, the use of power line communication (PLC) technology to transmit data in motor drive application is quite interesting. The use of a PLC modem dedicated to the home network in a three-phase inverter-fed motor power cable does not work. Therefore, specific coupling interfaces are developed to transmit data through a pulse-width modulated power supply. Laboratory tests have shown that the couplers are operating properly. They ensure reliable data transmission in a motor drive application.

  11. Advanced continuously variable transmissions for electric and hybrid vehicles

    Science.gov (United States)

    Loewenthal, S. H.

    1980-01-01

    A brief survey of past and present continuously variable transmissions (CVT) which are potentially suitable for application with electric and hybrid vehicles is presented. Discussion of general transmission requirements and benefits attainable with a CVT for electric vehicle use is given. The arrangement and function of several specific CVT concepts are cited along with their current development status. Lastly, the results of preliminary design studies conducted under a NASA contract for DOE on four CVT concepts for use in advanced electric vehicles are reviewed.

  12. Electric industry governance. Reconciling competitive power markets and the physics of complex transmission interconnections

    Energy Technology Data Exchange (ETDEWEB)

    Stalon, Charles G. [Energy Regulation, Cape Girardeau, MO (United States)

    1997-03-01

    Creating efficient, competitive power markets in an electric industry composed of interconnected control areas requires the existence of some agency with authority to define, impose and enforce rules for the operation of all control areas so interconnected. It has been noted that `the pursuit of self-interest, unrestrained by suitable institutions, carries no guarantee of anything except chaos`. In no part of the economy is this lesson more relevant than in the North American electric industry. As the industry evolves from one dominated by vertically-integrated utilities into one with competitive power markets and unregulated generators, the system of coordinating institutions that has worked acceptably well to restrain and guide self-interested decision makers of economically regulated firms must now be reconstructed to restrain and guide self-interested decision makers of unregulated generating companies (gencos), power merchants and brokers

  13. Water-hydraulic power transmission for offshore wind farms

    NARCIS (Netherlands)

    Diepeveen, N.F.B.; Jarquin Laguna, A.; Kempenaar, A.S.

    2012-01-01

    The current state of the art of offshore wind turbine power transmission technology is expensive, heavy and maintenance intensive. The Delft Offshore Turbine project considers a radically new concept for power transmission in an offshore wind farm: using seawater as power transmission medium. For

  14. DETERMINATION OF TRANSMISSION GEAR RATIO IN MECHANICAL PART OF TRACTOR ELECTRO-MECHANICAL TRANSMISSION

    Directory of Open Access Journals (Sweden)

    Ch. I. Zhdanovich

    2016-01-01

    Full Text Available A methodology has been developed for selection of gear number and transmission gear ratios in mechanical part of a wheel-type tractor with electro-mechanical transmission containing a propulsion asynchronous electric motor with variablefrequency control. The paper proposes to determine a transmission gear ratio on the basis of the following: provision of wheel torque dependence on tractor speed which is the best one for a traction process and during transfer from one gear to the other; provision of nominal operational mode of the electric motor for all tractor operations where it is working for a long period of time; provision of minimum possible number of gears; complete realization of internal combustion engine power on the tractor wheels at limit operational mode of the electric motor. As a characteristic of the asynchronous electric motor with variable-frequency control contains various portions which can be used either completely or partially due to operating conditions, the gear number is determined in the process of transmission gear ration finding but not prior to this. A wheel torque of the tractor with electro-mechanical transmission can be limited according to the following factors: grip of wheel with supporting surface; maximum power of an internal combustion engine which can be transferred to the wheels and a torque which is developed by a propulsion electric motor. It is not proposed to exceed nominal operational mode of the propulsion electric motor for all the operations of the tractor if it is working for a long period of time because in the case of significant excess of the nominal operational mode of the asynchronous electric motor its rather long operation leads to low efficiency and high losses in power, large heat liberation and consequently requires to develop more complicated system for electric motor cooling. An excess of nominal electric motor torque can be justified for short-term operational modes because in this case

  15. Shipboard electrical power systems

    CERN Document Server

    Patel, Mukund R

    2011-01-01

    Shipboard Electrical Power Systems addresses new developments in this growing field. Focused on the trend toward electrification to power commercial shipping, naval, and passenger vessels, this book helps new or experienced engineers master cutting-edge methods for power system design, control, protection, and economic use of power. Provides Basic Transferable Skills for Managing Electrical Power on Ships or on LandThis groundbreaking book is the first volume of its kind to illustrate optimization of all aspects of shipboard electrical power systems. Applying author Mukund Patel's rare combina

  16. Location matters: The impact of renewable power on transmission congestion and emissions

    International Nuclear Information System (INIS)

    Hitaj, Claudia

    2015-01-01

    Many governments offer subsidies for renewable power to reduce greenhouse gas emissions in the power sector. However, most support schemes for renewable power do not take into account that emissions depend on the location of renewable and conventional power plants within an electricity grid. I simulate optimal power flow in a test grid when 4 renewable power plants connect to the grid across 24 potential sites, amounting to over 10,000 configurations. Each configuration is associated with different levels of emissions and renewable power output. I find that emission reductions vary by a factor of 7 and that curtailment due to transmission congestion is more likely when renewable power plants are concentrated in an area of the grid with low demand. Large cost savings could be obtained by allowing subsidies for renewable power to vary across locations according to abatement potential or by replacing subsidies with a price on emissions. - Highlights: • Analyze the impact of renewable power plant location on congestion and emissions. • Simulate optimal power flow in a test grid for over 10,000 configurations. • Determine that emission reductions vary by a factor of 7. • Find that renewable power is curtailed due to transmission congestion. • Pricing emissions is most efficient since abatement potential varies across locations.

  17. Automating a spacecraft electrical power system using expert systems

    Science.gov (United States)

    Lollar, L. F.

    1991-01-01

    Since Skylab, Marshall Space Flight Center (MSFC) has recognized the need for large electrical power systems (EPS's) in upcoming Spacecraft. The operation of the spacecraft depends on the EPS. Therefore, it must be efficient, safe, and reliable. In 1978, as a consequence of having to supply a large number of EPS personnel to monitor and control Skylab, the Electrical power Branch of MSFC began the autonomously managed power system (AMPS) project. This project resulted in the assembly of a 25-kW high-voltage dc test facility and provided the means of getting man out of the loop as much as possible. AMPS includes several embedded controllers which allow a significant level of autonomous operation. More recently, the Electrical Division at MSFC has developed the space station module power management and distribution (SSM/PMAD) breadboard to investigate managing and distributing power in the Space Station Freedom habitation and laboratory modules. Again, the requirement for a high level of autonomy for the efficient operation over the lifetime of the station and for the benefits of enhanced safety has been demonstrated. This paper describes the two breadboards and the hierarchical approach to automation which was developed through these projects.

  18. A design of electric power supply system for gamma irradiator ISG-500

    International Nuclear Information System (INIS)

    Harno Garnito; Enggar; Harjani; Ari Satmoko; Sutomo Budihaharjo

    2010-01-01

    Reliability of electrical power system in Irradiator system is absolutely necessary during the life cycle. Electrical energy is used as the main supporting element for both Irradiator operation of mechanical system, lighting, as well as for instrumentation and control systems. The reliability of electrical power system in the system can be achieved by paying attention Irradiator safety, simplicity of operation, ease of maintenance and possible future development. Distribution network of the most commonly used is the Radial network system, for the simple and in accordance with the criteria demanded by a distribution system. In addition to the network system, to get the reliability of electric power supply system is the selection of equipment/materials that meet the standards, and the installation of which provide facilities for maintenance and repairs. (author)

  19. Strategic prospects of the electric power industry of Russia

    Science.gov (United States)

    Makarov, A. A.; Veselov, F. V.; Makarova, A. S.; Novikova, T. V.; Pankrushina, T. G.

    2017-11-01

    The prospects for the development of the electric power industry of Russia adopted at a regular stage of working out the Energy Strategy and the General Plan of Distribution of the Electric Power Facilities are discussed. The monitoring of the progress in the implementation of the Energy Strategies for the periods until 2020 and 2030 adopted in 2003 and 2009 has, in general, validated the correctness of the estimated volumes of the energy resource production under overestimation of the expected domestic demand owing to an excessively optimistic forecast of the real development of the economy. The priority lines of the national energy policy in electric power and allied industries proposed in the Energy Strategy for the period until 2035 are considered. The tools for implementation of most of the proposals and the effectiveness of their implementation have yet to be defined more concretely. The development of the energy sector and the electric power industry under the conservative and optimistic scenarios of the development of the country's economy has been predicted using the SCANER modeling and information system, viz., the dynamics of the domestic consumption, export, and production of the primary energy and the electric power has been determined and the commissioning and structure of the required generating capacities and the consumption of the basic types of the energy resources by the electric power industry and the centralized heat supply systems has been optimized. Changes in the economic efficiency of the nuclear and thermal power plants under the expected improvements on their cost and performance characteristics and an increase in the domestic fuel prices are presented. The competitiveness of the wind and solar power production under Russian conditions has been evaluated considering the necessity of reservation and partial duplication of their capacities when operated in the power supply systems. When optimizing the electric power industry as a subsystem

  20. Economic risks of the capacity expansion of electric power generation: impact of the nuclear energy

    International Nuclear Information System (INIS)

    Nieva G, R.

    2009-01-01

    Uncertainty and risks are inherent to the electric systems planning. The long period of construction that is characteristic of the electric sector works, as well as the long useful life of the generation assets and electric power transmission, they force to plan the expansion of the electric systems along horizons from 10 to 25 years. In periods so long of time it is impossible to predict with certainty the elements of the environment that could influence in the taking of decisions, like they are: the growth and the distribution of the electric power demand, the readiness and fuel prices; the investment costs of the technological options of generation and transmission, as well as the duration of the construction of future projects of new capacity addition. All expansion plan that will be propose, will be exposed to the uncertainty of the environment, gives place to risks or undesirable consequences. The nature of the risks, the strategies to delimit them and the outlines to assign them between the different interested parts and the diverse economic agents, depend in great measure of the legal and normative mark of the sector. In this work these topics are approached inside the reference mark of the Mexican public service of electric power. (Author)

  1. Power trip : stumbling toward a policy for NB power

    International Nuclear Information System (INIS)

    Tucker, T.L.; Norris, B.A.

    2003-10-01

    New Brunswick Power has one of the highest debt burdens of any crown utility along with one of the highest operating costs of any publicly owned electric utility in Canada. NB Power has borrowed heavily to invest in capital projects such as the expansion of its aging Point Lepreau nuclear plant. The current assets will not generate sufficient revenues to recover the investment. Kyoto requirements to reduce emissions have placed additional financial strain on the utility. It must also ensure funds for the eventual decommissioning of its nuclear facility. The utility's high operating costs are due to the high cost of coal used in its thermal generating plants. Since the utility relies on nuclear energy for 40 per cent of its output, it must maintain a high and costly reserve capacity in case the nuclear facility shuts down. In 2002, the government of New Brunswick announced plans to reorganize NB Power by creating a parent holding company with separate business units responsible for power generation, nuclear generation, power transmission, power distribution and customer service. A system operator will supervise access to the transmission system. The author argued that the restructuring will not address the problem of excessive costs and high debt. The NB Electric Finance Corporation will be created to service and retire the province's portion of the utility's debt. Instead of taxes and dividends on its equity position, NB Power will make payments to achieve the debt repayment. The restructured utility will still have to generate sufficient revenues to meet expenses. The following recommendations were presented: the government should privatize NB Power to cap taxpayers' debt liability; the government should assume an appropriate protion of the stranded debt liabilities to attract private investors to purchase the utility; electricity rates should be allowed to rise over time to reflect the real cost of operating the system; and, the government should open both the

  2. Switched causual modeling of transmission with clutch in hybrid electric vehicles

    OpenAIRE

    LHOMME, W; TRIGUI, R; DELARU, P; JEANNERET, B; BOUSCAUROL, A; BADIN, F

    2008-01-01

    Certain difficulties arise when attempting to model a clutch in a power train transmission due to its nonlinear behavior. Two different states have to be taken into account-the first being when the clutch is locked and the second being when the clutch is slipping. In this paper, a clutch model is developed using the Energetic Macroscopic Representation, which is, in turn, used in the modeling of complete hybrid electric vehicles (HEVs). Two different models are used, and a specific condition ...

  3. Evaluate electric field strengths in the vicinity of electric transmission systems of electric power; Avaliar intensidades de campo eletrico nas vizinhancas de sistemas de transmissao de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Rodrigues, J.F.; Ulson, J.A.C.; Creppe, R.C.; Serni, P.J.A. [Universidade Estadual Paulista Julio de Mesquita Filho (FEB/UNESP), Bauru, SP (Brazil). Fac. de Engenharia. Dept. de Engenharia Eletrica], Emails: jfranc@feb.unesp.br, ulson@feb.unesp.br, creppe@feb.unesp.br, paulojas@feb.unesp.br

    2009-07-01

    The main purpose in this paper is to describe a methodology for the calculation of the profile of the electric field in the level soil and proximities originated by electric energy transmission systems real and in operation in the country. It is also commented the equation used and your computational implementation in order to agile and to optimize the studies. The results of simulations were just presented for the transmission system in the voltage class 500 kV for to simplify the understanding and space restriction in the article, although five others types of configurations have also been used in the complete study with very voltages and respective classes. The results were animating and very nearby of values well-known of electric field of other and publications traditional in the area. The graphic exits of software for better visual comprehension and understanding went in accomplished in the plan (2D) and in the space (3D). (author)

  4. 75 FR 43915 - Basin Electric Power Cooperative: Deer Creek Station

    Science.gov (United States)

    2010-07-27

    ... factors that could be affected by the proposed Project were evaluated in detail in the EIS. These issues... DEPARTMENT OF AGRICULTURE Rural Utilities Service Basin Electric Power Cooperative: Deer Creek... Energy Facility project (Project) in Brookings and Deuel Counties, South Dakota. The Administrator of RUS...

  5. System Description of the Electrical Power Supply System for the ATLAS Integral Test Loop

    International Nuclear Information System (INIS)

    Moon, S. K.; Park, J. K.; Kim, Y. S.; Song, C. H.; Baek, W. P.

    2007-02-01

    An integral effect test loop for pressurized water reactors (PWRs), the ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation), is constructed by Thermal-Hydraulics Safety Research Team in Korea Atomic Energy Research Institute (KAERI). The ATLAS facility has been designed to have the length scale of 1/2 and area scale of 1/144 compared with the reference plant, APR1400. This report describes the design and technical specifications of the electrical power supply system which supplies the electrical powers to core heater rods, other heaters, various pumps and other systems. The electrical power supply system had acquired the final approval on the operation from the Korea Electrical Safety Corporation. During performance tests for the operation and control, the electrical power supply system showed completely acceptable operation and control performance

  6. Proceedings of the CERI 2002 electricity conference : getting a grip on power sector restructuring. CD-ROM ed.

    International Nuclear Information System (INIS)

    2002-01-01

    Electric power restructuring in a global context was reviewed at this conference which examined how existing market structures can be improved to benefit all participants. Topics of discussion ranged from issues regarding future development of power generation and transmission, to developing trends, expectations and implications for consumers, power generators and energy service providers. The 7 sessions of the conference were entitled: (1) global lessons from restructuring, what works and what doesn't, (2) competition in electricity markets, (3) restructuring in Canada, (4) suggestions for power sector reform, (5) competition in future generation markets, (6) trading, financing and generation alternatives, and (7) transmission expansion. A total of 7 papers have been indexed separately for inclusion in the database. refs., tabs., figs

  7. Heuristic procedures for transmission planning in competitive electricity markets

    International Nuclear Information System (INIS)

    Lu, Wene; Bompard, Ettore; Napoli, Roberto; Jiang, Xiuchen

    2007-01-01

    The network structure of the power system, in an electricity market under the pool model, may have severe impacts on market performance, reducing market efficiency considerably, especially when producers bid strategically. In this context network re-enforcement plays a major role and proper strategies of transmission planning need to be devised. This paper presents, for pool-model electricity markets, two heuristic procedures to select the most effective subset of lines that would reduce the impacts on the market, from a set of predefined candidate lines and within the allowed budget for network expansion. A set of indices that account for the economic impacts of the re-enforcing of the candidate lines, both in terms of construction cost and market efficiency, are proposed and used as sensitivity indices in the heuristic procedure. The proposed methods are applied and compared with reference to an 18-bus test system. (author)

  8. Microwave transmission system for space power

    Energy Technology Data Exchange (ETDEWEB)

    Dickinson, R M [Jet Propulsion Lab., Pasadena, Calif. (USA)

    1976-09-01

    A small total system model and a large subsystem element similar to those that could be eventually used for wireless power transmission experiments in space have been successfully demonstrated by NASA. The short range, relatively low-power laboratory system achieved a dc-to-dc transmission efficiency of 54%. A separate high-power-level receiving subsystem, tested over a 1.54-km range at Goldstone, California, has achieved the transportation of over 30 kW of dc output power. Both tests used 12-cm wave-length microwaves.

  9. Optimal Operation of Energy Storage in Power Transmission and Distribution

    Science.gov (United States)

    Akhavan Hejazi, Seyed Hossein

    In this thesis, we investigate optimal operation of energy storage units in power transmission and distribution grids. At transmission level, we investigate the problem where an investor-owned independently-operated energy storage system seeks to offer energy and ancillary services in the day-ahead and real-time markets. We specifically consider the case where a significant portion of the power generated in the grid is from renewable energy resources and there exists significant uncertainty in system operation. In this regard, we formulate a stochastic programming framework to choose optimal energy and reserve bids for the storage units that takes into account the fluctuating nature of the market prices due to the randomness in the renewable power generation availability. At distribution level, we develop a comprehensive data set to model various stochastic factors on power distribution networks, with focus on networks that have high penetration of electric vehicle charging load and distributed renewable generation. Furthermore, we develop a data-driven stochastic model for energy storage operation at distribution level, where the distribution of nodal voltage and line power flow are modelled as stochastic functions of the energy storage unit's charge and discharge schedules. In particular, we develop new closed-form stochastic models for such key operational parameters in the system. Our approach is analytical and allows formulating tractable optimization problems. Yet, it does not involve any restricting assumption on the distribution of random parameters, hence, it results in accurate modeling of uncertainties. By considering the specific characteristics of random variables, such as their statistical dependencies and often irregularly-shaped probability distributions, we propose a non-parametric chance-constrained optimization approach to operate and plan energy storage units in power distribution girds. In the proposed stochastic optimization, we consider

  10. S-band 45 MW peak power test facility at RRCAT

    International Nuclear Information System (INIS)

    Wanmode, A. Yashwant; Reddy, Sivananda; Mulchandani, J.; Mohania, Praveen; Shrivastava, B. Purushottam

    2015-01-01

    RRCAT is engaged in the design and development of high energy electron LINAC as future injectors for the Booster Synchrotron for Indus-1 and Indus-2 SRS. The high energy LINAC will need microwave power over 30 MW depending on the number of structures to be energized. In order to have advance preparations for this development a 45 MW S-Band test facility has been designed and developed at RRCAT. The test stand is built around a 45 MW peak power S-band pulsed klystron, A conventional pulse forming network based modulator for klystron has been designed and developed. The WR-284 waveguide transmission system consisting of dual directional couplers, SF 6 gas pressurization unit, high power waveguide load and arc sensor has been developed and interfaced with the klystron. The klystron has been successfully tested up to 30 MW peak power at 2856 MHz on SF 6 pressurized waveguide line. A solid state S Band driver amplifier up to 1 kW output power was designed developed for driving the klystron. This paper describes the results of 30 MW peak power test of this facility. (author)

  11. HVDC transmission from nuclear power plant

    International Nuclear Information System (INIS)

    Yoshida, Yukio; Takenaka, Kiyoshi; Ichikawa, Takemi; Ueda, Kiyotaka; Machida, Takehiko

    1979-01-01

    The HVDC transmission directly from nuclear power plants is one of the patterns of long distance and large capacity HVDC transmission systems. In this report, the double pole, two-circuit HVDC transmission from a BWR nuclear power plant is considered, and the dynamic response characteristics due to the faults in dc line and ac line of inverter side are analyzed, to clarify the dynamic characteristics of the BWR nuclear power plant and dc system due to system faults and the effects of dc power control to prevent reactor scram. (1) In the instantaneous earthing fault of one dc line, the reactor is not scrammed by start-up within 0.8 sec. (2) When the earthing fault continues, power transmission drops to 75% by suspending the faulty pole, and the reactor is scrammed. (3) In the instantaneous ground fault of 2 dc lines, the reactor is not scrammed if the faulty dc lines are started up within 0.4 sec. (4) In the existing control of dc lines, the reactor is scrammed when the ac voltage at an ac-dc connection point largely drops due to ac failure. (J.P.N.)

  12. Transmission Line Security Monitor: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  13. Power losses in electrical networks depending on weather conditions

    International Nuclear Information System (INIS)

    Zhelezko, Yu. S.; Kostyushko, V. A.; Krylov, S. V.; Nikiforov, E. P.; Savchenko, O. V.; Timashova, L. V.; Solomonik, E. A.

    2005-01-01

    Specific power losses to corona and to leakage currents over overhead insulators are presented for 110 - 750-kV transmission lines with different phase design and pole types for different weather conditions. Consumption of electric energy for ice melting on conductors of various cross sections is evaluated. Meteorological data of 1372 weather stations in Russia are processed for a period of 10 years. The territory of the country is divided into 7 regions with approximately homogeneous weather conditions. Specific power losses to corona and leakage currents over overhead insulators are presented for every region

  14. Recent Accomplishments in Laser-Photovoltaic Wireless Power Transmission

    Science.gov (United States)

    Fikes, John C.; Henley, Mark W.; Mankins, John C.; Howell, Joe T.; Fork, Richard L.; Cole, Spencer T.; Skinner, Mark

    2003-01-01

    Wireless power transmission can be accomplished over long distances using laser power sources and photovoltaic receivers. Recent research at AMOS has improved our understanding of the use of this technology for practical applications. Research by NASA, Boeing, the University of Alabama-Huntsville, the University of Colorado, Harvey Mudd College, and the Naval Postgraduate School has tested various commercial lasers and photovoltaic receiver configurations. Lasers used in testing have included gaseous argon and krypton, solid-state diodes, and fiber optic sources, at wavelengths ranging from the visible to the near infra-red. A variety of Silicon and Gallium Arsenide photovoltaic have been tested with these sources. Safe operating procedures have been established, and initial tests have been conducted in the open air at AMOS facilities. This research is progressing toward longer distance ground demonstrations of the technology and practical near-term space demonstrations.

  15. Electric vehicle system for charging and supplying electrical power

    Science.gov (United States)

    Su, Gui Jia

    2010-06-08

    A power system that provides power between an energy storage device, an external charging-source/load, an onboard electrical power generator, and a vehicle drive shaft. The power system has at least one energy storage device electrically connected across a dc bus, at least one filter capacitor leg having at least one filter capacitor electrically connected across the dc bus, at least one power inverter/converter electrically connected across the dc bus, and at least one multiphase motor/generator having stator windings electrically connected at one end to form a neutral point and electrically connected on the other end to one of the power inverter/converters. A charging-sourcing selection socket is electrically connected to the neutral points and the external charging-source/load. At least one electronics controller is electrically connected to the charging-sourcing selection socket and at least one power inverter/converter. The switch legs in each of the inverter/converters selected by the charging-source/load socket collectively function as a single switch leg. The motor/generators function as an inductor.

  16. Electric power annual, 1990

    International Nuclear Information System (INIS)

    1992-01-01

    The Electric Power Annual presents a summary of electric utility statistics at the national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policy-makers, analysts and the general public with historical data that may be used in understanding US electricity markets. ''The Industry at a Glance'' section presents a profile of the electric power industry ownership and performance; a review of key statistics for the year; and projections for various aspects of the electric power industry through 2010. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; electricity sales, revenue, and average revenue per kilowatthour sold; financial statistics; environmental statistics; and electric power transactions. In addition, appendices provide supplemental data on major disturbances and unusual occurrences. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter

  17. Electrical engineering unit for the reactive power control of the load bus at the voltage instability

    Science.gov (United States)

    Kotenev, A. V.; Kotenev, V. I.; Kochetkov, V. V.; Elkin, D. A.

    2018-01-01

    For the purpose of reactive power control error reduction and decrease of the voltage sags in the electric power system caused by the asynchronous motors started the mathematical model of the load bus was developed. The model was built up of the sub-models of the following elements: a transformer, a transmission line, a synchronous and an asynchronous loads and a capacitor bank load, and represents the automatic reactive power control system taking into account electromagnetic processes of the asynchronous motors started and reactive power changing of the electric power system elements caused by the voltage fluctuation. The active power/time and reactive power/time characteristics based on the recommended procedure of the equivalent electric circuit parameters calculation were obtained. The derived automatic reactive power control system was shown to eliminate the voltage sags in the electric power system caused by the asynchronous motors started.

  18. Liberation of electric power and nuclear power generation

    International Nuclear Information System (INIS)

    Yajima, Masayuki

    2000-01-01

    In Japan, as the Rule on Electric Business was revised after an interval of 35 years in 1995, and a competitive bid on new electric source was adopted after 1996 fiscal year, investigation on further competition introduction to electric power market was begun by establishment of the Basic Group of the Electric Business Council in 1997. By a report proposed on January, 1999 by the Group, the Rule was revised again on March, 1999 to start a partial liberation or retail of the electric power from March, 2000. From a viewpoint of energy security and for solution of global environmental problem in Japan it has been decided to positively promote nuclear power in future. Therefore, it is necessary to investigate how the competition introduction affects to development of nuclear power generation and what is a market liberation model capable of harmonizing with the development on liberation of electric power market. Here was elucidated on effect of the introduction on previous and future nuclear power generation, after introducing new aspects of nuclear power problems and investigating characteristic points and investment risks specific to the nuclear power generation. And, by investigating some possibilities to development of nuclear power generation under liberation models of each market, an implication was shown on how to be future liberation on electric power market in Japan. (G.K.)

  19. Islanding the power grid on the transmission level: less connections for more security

    Science.gov (United States)

    Mureddu, Mario; Caldarelli, Guido; Damiano, Alfonso; Scala, Antonio; Meyer-Ortmanns, Hildegard

    2016-10-01

    Islanding is known as a management procedure of the power system that is implemented at the distribution level to preserve sensible loads from outages and to guarantee the continuity in electricity supply, when a high amount of distributed generation occurs. In this paper we study islanding on the level of the transmission grid and shall show that it is a suitable measure to enhance energy security and grid resilience. We consider the German and Italian transmission grids. We remove links either randomly to mimic random failure events, or according to a topological characteristic, their so-called betweenness centrality, to mimic an intentional attack and test whether the resulting fragments are self-sustainable. We test this option via the tool of optimized DC power flow equations. When transmission lines are removed according to their betweenness centrality, the resulting islands have a higher chance of being dynamically self-sustainable than for a random removal. Less connections may even increase the grid’s stability. These facts should be taken into account in the design of future power grids.

  20. Improved SCR ac Motor Controller for Battery Powered Urban Electric Vehicles

    Science.gov (United States)

    Latos, T. S.

    1982-01-01

    An improved ac motor controller, which when coupled to a standard ac induction motor and a dc propulsion battery would provide a complete electric vehicle power train with the exception of the mechanical transmission and drive wheels was designed. In such a system, the motor controller converts the dc electrical power available at the battery terminals to ac electrical power for the induction motor in response to the drivers commands. The performance requirements of a hypothetical electric vehicle with an upper weight bound of 1590 kg (3500 lb) were used to determine the power rating of the controller. Vehicle acceleration capability, top speed, and gradeability requisites were contained in the Society of Automotive Engineers (SAE) Schedule 227a(d) driving cycle. The important capabilities contained in this driving cycle are a vehicle acceleration requirement of 0 to 72.4 kmph (0 to 45 mph) in 28 seconds a top speed of 88.5 kmph (55 mph), and the ability to negotiate a 10% grade at 48 kmph (30 mph). A 10% grade is defined as one foot of vertical rise per 10 feet of horizontal distance.

  1. Quantifying the value of hydropower in the electric grid : role of hydropower in existing markets.

    Energy Technology Data Exchange (ETDEWEB)

    Loose, Verne W.

    2011-01-01

    The electrical power industry is facing the prospect of integrating a significant addition of variable generation technologies in the next several decades, primarily from wind and solar facilities. Overall, transmission and generation reserve levels are decreasing and power system infrastructure in general is aging. To maintain grid reliability modernization and expansion of the power system as well as more optimized use of existing resources will be required. Conventional and pumped storage hydroelectric facilities can provide an increasingly significant contribution to power system reliability by providing energy, capacity and other ancillary services. However, the potential role of hydroelectric power will be affected by another transition that the industry currently experiences - the evolution and expansion of electricity markets. This evolution to market-based acquisition of generation resources and grid management is taking place in a heterogeneous manner. Some North American regions are moving toward full-featured markets while other regions operate without formal markets. Yet other U.S. regions are partially evolved. This report examines the current structure of electric industry acquisition of energy and ancillary services in different regions organized along different structures, reports on the current role of hydroelectric facilities in various regions, and attempts to identify features of market and scheduling areas that either promote or thwart the increased role that hydroelectric power can play in the future. This report is part of a larger effort led by the Electric Power Research Institute with purpose of examining the potential for hydroelectric facilities to play a greater role in balancing the grid in an era of greater penetration of variable renewable energy technologies. Other topics that will be addressed in this larger effort include industry case studies of specific conventional and hydro-electric facilities, systemic operating constraints

  2. Driving with electrical power

    International Nuclear Information System (INIS)

    Ursin, M.; Hoeckel, M.

    2008-01-01

    This article takes a look at the chances offered to the electricity supply industry by the increasing use of battery-driven vehicles - and the advantages thus offered to the environment. The use of the vehicles' batteries to form a distributed electricity storage scheme is discussed. The authors comment that, although electrically-driven vehicles consume more power, the total primary energy consumption and pollutant emissions will be reduced. The actual electricity consumption of electric vehicles and the source of this power are examined. Power saved by the reduced use of electrical heating systems and boilers could, according to the authors, be used to charge the batteries of electric vehicles. The use of these batteries as a storage system to help regulate electricity supplies is discussed and the steps to be taken for the implementation of such a system are listed

  3. Electric power transport costs - methodologies analysis; Custos de transporte de energia eletrica: analise de metodologias

    Energy Technology Data Exchange (ETDEWEB)

    Takahata, Dario

    1997-07-01

    The dissertation presents the aspects related to the restructuring of power systems in terms of international experiences, and the possible implications for the definition of the new power system in Brazil. The experience shows that the reform in various countries has started from the sector deverticalization, together with the transmissions open access scheme. The retrospect of researched countries indicates that the transmissions remuneration is based on a methodology that recovers the operative cost of transmission transactions, along with an additional amount that take into account the cost of the existing transmission system. The following countries have been analyzed: Chile, Norway, England and Argentina. This work also shows the current situation in Brazil, as in terms of tariffs, as regarding the power system organizational structure, as well as a preliminary proposal conceived by SINTREL (National System of Electrical Energy Transmission) to evaluate the transmission transaction cost. This dissertation ended with comments and conclusions, depicting a future program which might be followed, considering the aspects quoted above and the peculiarities of brazilian power system. (author)

  4. Transmission congestion management in the electricity market

    Science.gov (United States)

    Chen, Yue

    2018-04-01

    In this paper we mainly discuss how to optimize the arrangement to decrease the loss of each line when the power generation side of the system transmission congestion occurs in a safe and economical manner. We respectively set the adjust model if the transmission can be eliminated which can calculate the best scheme and safety margin model when transmission cannot be eliminated which is a multi-objective planning problem. We solve the two models on the condition of the load power demands are 982.4MW and 1052.8 MW by Lingo and get the optimal management scheme.

  5. New technologies application to increase the transmission capacity in power systems; Aplicacao de novas tecnologias para aumentar a capacidade de transmissao em sistemas de potencia

    Energy Technology Data Exchange (ETDEWEB)

    Figueiredo, Erli Ferreira [Universidade do Estado, Rio de Janeiro, RJ (Brazil)]. E-mail: erli@openlink.com.br

    2001-07-01

    The deregulation and the Brazilian electric sector new formulation associated to the growth of the electric energy market, has been contributing to increase the power flows through located transmission lines in one same region, as well as in different regions. This increase of flow will require the construction of new transmission lines, in general associated to eventual efforts in the system. However, due to environmental restrictions and to difficulties for acquisition of free soil bands for transmission lines, in this article new technologies of transmission in order to increase the capacity of the existing and future power systems are presented, with the purpose of preventing or postponing the construction of new transmission lines.

  6. Electric power industry in Korea: Past, present, and future

    International Nuclear Information System (INIS)

    Lee, Hoesung.

    1994-01-01

    Electrical power is an indispensable tool in the industrialization of a developing country. An efficient, reliable source of electricity is a key factor in the establishment of a wide range of industries, and the supply of energy must keep pace with the increasing demand which economic growth creates in order for that growth to be sustained. As one of the most successful of all developing countries, Korea has registered impressive economic growth over the last decade, and it could be said that the rapid growth of the Korean economy would not have been possible without corresponding growth in the supply of electric power. Power producers in Korea, and elsewhere in Asia, are to be commended for successfully meeting the challenge of providing the necessary power to spur what some call an economic miracle. The future continues to hold great potential for participants in the electrical power industry, but a number of important challenges must be met in order for that potential to be fully realized. Demand for electricity continues to grow at a staggering rate, while concerns over the environmental impact of power generating facilities must not be ignored. As it becomes increasingly difficult to finance the rapid, and increasingly larger-scale expansion of the power industry through internal sources, the government must find resources to meet the growing demand at least cost. This will lead to important opportunities for the private sector. It is important, therefore, for those interested in participating in the power production industry and taking advantage of the newly emerging opportunities that lie in the Korean market, and elsewhere in Asia, to discuss the relevant issues and become informed of the specific conditions of each market

  7. Linking the grids : marketing power across the border

    International Nuclear Information System (INIS)

    Lawrence, G.K.

    1998-01-01

    A review of U.S. regulations such as Federal Energy Regulatory Commission (FERC) order 888 and 889, regarding the transmission and distribution of electricity by electric utilities was presented. This presentation outlined FERC market power tests for power marketer applications. Meeting the 'Market Power' Test requirements means that FERC will allow a power marketer to sell power at market-based rates provided that the applicant can demonstrate that (1) neither it, nor its affiliates, is a dominant firm in generation sales in the relevant market, (2) owns or controls transmission facilities, (3) can erect or control any other barrier to market entry, or (4) abuses the affiliate relationship or has reciprocal dealings. The market power test applies to power marketers affiliated with government-owned Canadian utilities such as Energy Alliance Partnership, TransAlta Enterprises Corp., Ontario Hydro Interconnected Markets, British Columbia Power Exchange Corp., and H.Q. Energy Services (U.S.) Inc. Present state of the FERC applications of each of these power marketers was reviewed. Some lessons learned from U.S. retail natural gas unbundling were described. The general conclusion was that the future for Canadian sales into the U.S. electricity market is exciting, even if meeting FERC conditions is going to be difficult. Those who can, will prosper

  8. Electrodynamic Wireless Power Transmission to Rotating Magnet Receivers

    International Nuclear Information System (INIS)

    Garraud, A; Jimenez, J D; Garraud, N; Arnold, D P

    2014-01-01

    This paper presents an approach for electrodynamic wireless power transmission (EWPT) using a synchronously rotating magnet located in a 3.2 cm 3 receiver. We demonstrate wireless power transmission up to 99 mW (power density equal to 31 mW/cm 3 ) over a 5-cm distance and 5 mW over a 20-cm distance. The maximum operational frequency, and hence maximal output power, is constrained by the magnetic field amplitude. A quadratic relationship is found between the maximal output power and the magnetic field. We also demonstrate simultaneous, power transmission to multiple receivers positioned at different locations

  9. Electrodynamic wireless power transmission to a torsional receiver

    International Nuclear Information System (INIS)

    McEachern, K M; Arnold, D P

    2013-01-01

    This paper presents a wireless power transmission (WPT) concept that uses electrodynamic coupling and torsional motion of a permanent magnet in the receiver. The system is shown to transfer an average power of 3.09 mW (power density equal to 143 μW/cm 3 ) over a distance of 1 cm, an average power of 1.98 mW over a distance of 2 cm, and an average power of 126 μW over a distance of 7 cm. We also demonstrate unaltered power transmission through conductive media, including a human hand and an aluminum plate, highlighting a key advantage of the electrodynamic wireless power transmission approach

  10. Differential infrared thermography applied to power generation facilities -- A case history

    International Nuclear Information System (INIS)

    Kaplan, H.; Zayicek, P.

    1995-01-01

    The controlled and systematic application of differential thermal imaging (DIT) can be a highly promising tool for condition monitoring and predictive maintenance of electronic, electrical and mechanical elements and can dramatically improve the reliability, maintainability and operational life of certain types of elements in the power generation and distribution community. The expanded applicability of this technique has been brought about by improvements in commercial IR thermal imaging equipment and advances in the related data and image processing capacities. This paper summarizes the advantages and limitations of DIT and describes several variations of the technique. It goes on to provide an update of progress on a program initiated by the Electric Power Research Institute (EPRI) Nondestructive Evaluation (NDE) Center to apply DIT to operating elements within a power generating station environment (Wolf Creek Nuclear Facility). It traces the selection of candidate elements at some of EPRI's member facilities, the implementation of exploratory measurements on selected candidates using available on-site infrared imaging equipment and the analysis of significant findings on one specific critical element. Finally, a projection for the potential future applicability of the DIT technique is provided

  11. Electric power production contra electricity savings

    International Nuclear Information System (INIS)

    Schleisner, L.; Grohnheit, P.E.; Soerensen, H.

    1991-01-01

    The expansion of electricity-producing plants has, in Denmark until now, taken place in accordance with the demand for electricity. Recently, it has been suggested that the cost of the further development of such systems is greater than the cost of instigating and carrying out energy conservation efforts. The aim of the project was to evaluate the consequences for power producing plants of a reduction of the electricity consumption of end-users. A method for the analysis of the costs involved in the system and operation of power plants contra the costs that are involved in saving electricity is presented. In developing a model of this kind, consideration is given to the interplay of the individual saving project and the existing or future electricity supply. Thus it can be evaluated to what extent it would be advisable to substitute investments in the development of the capacity of the power plants with investments in the reduction of electricity consumption by the end users. This model is described in considerable detail. It will be tested in representative situations and locations throughout the Nordic countries. (AB) 17 refs

  12. Brayton Power Conversion Unit Tested: Provides a Path to Future High-Power Electric Propulsion Missions

    Science.gov (United States)

    Mason, Lee S.

    2003-01-01

    Closed-Brayton-cycle conversion technology has been identified as an excellent candidate for nuclear electric propulsion (NEP) power conversion systems. Advantages include high efficiency, long life, and high power density for power levels from about 10 kWe to 1 MWe, and beyond. An additional benefit for Brayton is the potential for the alternator to deliver very high voltage as required by the electric thrusters, minimizing the mass and power losses associated with the power management and distribution (PMAD). To accelerate Brayton technology development for NEP, the NASA Glenn Research Center is developing a low-power NEP power systems testbed that utilizes an existing 2- kWe Brayton power conversion unit (PCU) from previous solar dynamic technology efforts. The PCU includes a turboalternator, a recuperator, and a gas cooler connected by gas ducts. The rotating assembly is supported by gas foil bearings and consists of a turbine, a compressor, a thrust rotor, and an alternator on a single shaft. The alternator produces alternating-current power that is rectified to 120-V direct-current power by the PMAD unit. The NEP power systems testbed will be utilized to conduct future investigations of operational control methods, high-voltage PMAD, electric thruster interactions, and advanced heat rejection techniques. The PCU was tested in Glenn s Vacuum Facility 6. The Brayton PCU was modified from its original solar dynamic configuration by the removal of the heat receiver and retrofitting of the electrical resistance gas heater to simulate the thermal input of a steady-state nuclear source. Then, the Brayton PCU was installed in the 3-m test port of Vacuum Facility 6, as shown. A series of tests were performed between June and August of 2002 that resulted in a total PCU operational time of about 24 hr. An initial test sequence on June 17 determined that the reconfigured unit was fully operational. Ensuing tests provided the operational data needed to characterize PCU

  13. Vehicle-to-Grid Power in Danish Electric Power Systems

    DEFF Research Database (Denmark)

    Pillai, Jayakrishnan Radhakrishna; Bak-Jensen, Birgitte

    2009-01-01

    The integration of renewable energy systems is often constrained by the variable nature of their output. This demands for the services of storing the electricity generated from most of the renewable energy sources. Vehicle-to-grid (V2G) power could use the inherent energy storage of electric...... vehicles and its quick response time to balance and stabilize a power system with fluctuating power. This paper outlines the use of battery electric vehicles in supporting large-scale integration of renewable energy in the Danish electric power systems. The reserve power requirements for a high renewable...... energy penetration could be met by an amount of V2G based electric vehicles less than 10% of the total vehicle need in Denmark. The participation of electric vehicle in ancillary services would earn significant revenues to the vehicle owner. The power balancing services of electric vehicles...

  14. VT Electric Transmission Line Corridors - corridor lines

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The ELTRN layer depicts electric transmission line corridors in Vermont. Various methods have been used to digitize features. The data layer...

  15. VT Electric Transmission Line Corridors - substation points

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The ELTRN layer depicts electric transmission line corridors in Vermont. Various methods have been used to digitize features. The data layer...

  16. 2015 Plan. Project 5: transmission systems of electric power

    International Nuclear Information System (INIS)

    1992-12-01

    The planning aspects of transmission system expansion in Brazil are described, mentioning the evolution at long date of the transmission system, emphasizing the qualitative and strategic aspects. The engineering aspects and the technological development are also presented. (C.G.C.)

  17. Structure-property relationships in an Al matrix Ca nanofilamentary composite conductor with potential application in high-voltage power transmission

    Science.gov (United States)

    Tian, Liang

    This study investigated the processing-structure-properties relationships in an Al/Ca composites using both experiments and modeling/simulation. A particular focus of the project was understanding how the strength and electrical conductivity of the composite are related to its microstructure in the hope that a conducting material with light weight, high strength, and high electrical conductivity can be developed to produce overhead high-voltage power transmission cables. The current power transmission cables (e.g., Aluminum Conductor Steel Reinforced (ACSR)) have acceptable performance for high-voltage AC transmission, but are less well suited for high-voltage DC transmission due to the poorly conducting core materials that support the cable weight. This Al/Ca composite was produced by powder metallurgy and severe plastic deformation by extrusion and swaging. The fine Ca metal powders have been produced by centrifugal atomization with rotating liquid oil quench bath, and a detailed study about the atomization process and powder characteristics has been conducted. The microstructure of Al/Ca composite was characterized by electron microscopy. Microstructure changes at elevated temperature were characterized by thermal analysis and indirect resistivity tests. The strength and electrical conductivity were measured by tensile tests and four-point probe resistivity tests. Predicting the strength and electrical conductivity of the composite was done by micro-mechanics-based analytical modeling. Microstructure evolution was studied by mesoscale-thermodynamics-based phase field modeling and a preliminary atomistic molecular dynamics simulation. The application prospects of this composite was studied by an economic analysis. This study suggests that the Al/Ca (20 vol. %) composite shows promise for use as overhead power transmission cables. Further studies are needed to measure the corrosion resistance, fatigue properties and energized field performance of this composite.

  18. Project clean city: joint trenching for urban facilities; Projeto cidade limpa: vala tecnica para instalacoes urbanas - sistema infavias

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Aloisio Pereira da [Companhia de Gas de Santa Catarina (SCGAS), Florianopolis, SC (Brazil)

    2012-07-01

    This study aims to propose a join trench for urban facilities, using concepts related to planning and urban cadastre, sustainability of resource use, and mainly focus on safety during construction, operation and maintenance. The model proposes the replacement of individual construction of facilities of natural gas, potable water, telephone, data transmission and electricity (low and medium voltage) by a system that encompasses all of these facilities in a trench, the deployment may also occur in the same period or if necessary, or at different times, creating flexibility in the system. The security of facilities due to the operational interface between the concessionaires and clients will be ensured by the protected by reinforced concrete structure, designed using the concept of 'fail-safing', derived from the Toyota Production System. The joint trench model was designed from the perspective of sustainability and technological innovation for your future use of the new design of power supply, through the concept of 'Smart Grid' with the use of bidirectional power system transmission and distribution, in decentralized model for generating electricity through cogeneration systems with natural gas. (author)

  19. A distributed process monitoring system for nuclear powered electrical generating facilities

    International Nuclear Information System (INIS)

    Sweney, A.D.

    1991-01-01

    Duke Power Company is one of the largest investor owned utilities in the United States, with a service area of 20,000 square miles extending across North and South Carolina. Oconee Nuclear Station, one of Duke Power's three nuclear generating facilities, is a three unit pressurized water reactor site and has, over the course of its 15-year operating lifetime, effectively run out of plant processing capability. From a severely overcrowded cable spread room to an aging overtaxed Operator Aid Computer, the problems with trying to add additional process variables to the present centralized Operator Aid Computer are almost insurmountable obstacles. This paper reports that for this reason, and to realize the inherent benefits of a distributed process monitoring and control system, Oconee has embarked on a project to demonstrate the ability of a distributed system to perform in the nuclear power plant environment

  20. Transmission prices in the electric system. Technical constraints and economic efficiency

    International Nuclear Information System (INIS)

    Polidori, P.

    1999-01-01

    This article analyses the two main models at the core of today's theoretical discussion on transmission pricing in electricity sectors under competition. The first aim of the paper is showing how technical constraints that characterise transmission systems may affect energy production and transmission and therefore the definition of the price system for using the electric grid. The second aim of the paper is showing how it is possible to suggest solutions, although not free from limitations, that can be used for an efficient management of electric systems characterised by generation and consumption sectors under competition [it